30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, G.J.; Rose, W.M.; Domenici, P.V.
This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects ofmore » the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)« less
To provide RCRA hazardous waste permitting regulatory information and resources permitted facilities, hazardous waste generators, and permit writers. To provide the public with information on how they can be involved in the permitting process.
40 CFR 270.65 - Research, development, and demonstration permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...
40 CFR 270.65 - Research, development, and demonstration permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terusaki, Stanley; Gallegos, Gretchen; MacQueen, Donald
2012-10-02
LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potentialmore » interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.« less
Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivkin, Carl; Buttner, William; Burgess, Robert
2016-03-28
The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.
2009-01-01
for a fundamental physical understanding of electronic properties . The Materials Processing Facility includes appa- ratuses for powder production by...situ. Facilities to process powder into bulk specimens by hot and cold isostatic pressing permit a variety of consolidation possibilities. The iso...Synthesis/ Property Measurement Facility has special emphasis on polymers, surface-film processing , and directed self-assembly. The Chemical Vapor
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...
Commonwealth of Pennsylvania. [Establishment of hazardous waste facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Environmental Resources Secretary Arthur A. Davis and Commerce Secretary Raymond R. Christman have announced a joint initiative to establish commercial hazardous waste treatment and disposal facilities Pennsylvania. The state Hazardous Sites Cleanup Act, which Gov. Robert P. Casey signed into law last October, called for accelerated efforts in this regard. These included an expedited permitting process for facilities, requiring the Department of Environmental Resources (DER) to appoint a special sitting team to review permit applications, and designation of sitting coordinator within the Department of Commerce to identify potential developers of the facilities and encourage them to operate within Pennsylvania.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and review process for LNG terminal facilities and other natural gas facilities prior to filing of... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY AND FOR ORDERS PERMITTING AND APPROVING ABANDONMENT UNDER SECTION 7 OF THE NATURAL...
Air modelling as an alternative to sampling for low-level radioactive airborne releases
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morgenstern, M.Y.; Hueske, K.
1995-05-01
This paper describes our efforts to assess the effect of airborne releases at one DOE laboratory using air modelling based on historical data. Among the facilities affected by these developments is Los Alamos National Laboratory (LANL) in New Mexico. RCRA, as amended by the Hazardous and Solid Waste Amendments (HSWA) in 1984, requires all facilities which involve the treatment, storage, and disposal of hazardous waste obtain a RCRA/HSWA waste facility permit. LANL complied with CEARP by initiating a process of identifying potential release sites associated with LANL operations prior to filing a RCRA/HSWA permit application. In the process of preparingmore » the RCRA/HSWA waste facility permit application to the U.S. Environmental Protection Agency (EPA), a total of 603 Solid Waste Management Units (SWMUs) were identified as part of the requirements of the HSWA Module VIH permit requirements. The HSWA Module VIII permit requires LANL to determine whether there have been any releases of hazardous waste or hazardous constituents from SWMUs at the facility dating from the 1940`s by performing a RCRA Facility Investigation to address known or suspected releases from specified SWMUs to affected media (i.e. soil, groundwater, surface water, and air). Among the most troublesome of the potential releases sites are those associated with airborne radioactive releases. In order to assess health risks associated with radioactive contaminants in a manner consistent with exposure standards currently in place, the DOE and LANL have established Screening Action Levels (SALs) for radioactive soil contamination. The SALs for each radionuclide in soil are derived from calculations based on a residential scenario in which individuals are exposed to contaminated soil via inhalation and ingestion as well as external exposure to gamma emitters in the soil. The applicable SALs are shown.« less
15 CFR 971.606 - Onshore information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...
15 CFR 971.606 - Onshore information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...
47 CFR 73.1615 - Operation during modification of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
HANDBOOK: GUIDE TO TECHNICAL RESOURCES FOR THE DESIGN OF LAND DISPOSAL FACILITIES
This Handbook facilitates the preparation and processing of land disposal permit applications. It directs the regulated community and the regulators to the appropriate EPA technical resource documents, as they prepare or review permits required under PL 480 (RCRA). Topics discuss...
17 CFR 37.203 - Rule enforcement program.
Code of Federal Regulations, 2014 CFR
2014-04-01
... shall establish and enforce trading, trade processing, and participation rules that will deter abuses... practices prohibited. A swap execution facility shall prohibit abusive trading practices on its markets by members and market participants. Swap execution facilities that permit intermediation shall prohibit...
Code of Federal Regulations, 2010 CFR
2010-07-01
... history of significant non-compliance with regulations or permit conditions. (3) The facility has a demonstrated history of submitting incomplete or deficient permit application information. (4) The facility has... standardized RCRA permit. (2) Circumstances have changed since the time the facility owner or operator applied...
1985-12-01
Lobster Shop - 759-2165. 4013 Ruston Way. Known for excellent seafood. Nautical The Bay Co. - 752-6661. 3327 Ruston Way. Various entrees. CI Shenanigans ...se- RCRA permit is inappropriate." Ac- forms of financial responsibility for rious potential health problem in New cording to Rogers and Darrah, under...admini- strative, monitoring, and financial standards for them. EPA will use these independently enforceable standards to issue permits to owners
Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Juarez, Catherine L.; Funk, David John; Vigil-Holterman, Luciana R.
2016-03-07
The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide themore » basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-08-01
As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81more » Water Services waste water.« less
77 FR 69769 - Solid Waste Rail Transfer Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
.... SUMMARY: These final rules govern land-use-exemption permits for solid waste rail transfer facilities. The... ``land-use-exemption permits'' in certain circumstances. Under the CRA, a solid waste rail transfer... grants a land-use-exemption permit for a solid waste rail transfer facility, such permit would only...
10 CFR 2.104 - Notice of hearing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...
NPDES Permit for Riverview Estates Wastewater Treatment Facility in North Dakota
Under National Pollutant Discharge Elimination System permit number ND-0031143, the Riverview Estates Wastewater Treatment Facility is authorized to discharge from its wastewater treatment facility in designated locations as described in the permit.
In-Plant Reuse of Pollution Abated Waters.
1984-08-01
Carbon Treatment Facility Prefilters D-10 Spent Carbon Receiving Tank EZ D-11 Powdered Carbon Feeder System E. Process Chemical Assay/Monitoring...PBA manufacturing complex, several wastewater treatment facilities were built to treat wastewater from various plants . This task deals with...all of which discharge to the Central Treatment Facility (Appendix K-I). The plant is permitted (Appendix I-I) by EPA and consists of a lime/alum
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...
2017-04-26
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin
2017-06-06
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... Permitting Rule for Cotton Gins AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... particulate matter emissions from cotton ginning facilities. The submitted Cotton Gin regulation provides an alternative preconstruction process for cotton ginning facilities that will emit no more than 50 tons per year...
Wyoming's industrial siting permit process and environmental impact assessment
NASA Astrophysics Data System (ADS)
Hyman, Eric L.
1982-01-01
The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.
Centrifuge Facility for the International Space Station Alpha
NASA Technical Reports Server (NTRS)
Johnson, Catherine C.; Hargens, Alan R.
1994-01-01
The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from other 0 environmental factors and to examine artificial gravity as a potential countermeasure for the physical deconditioning observed during spaceflight.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coenenberg, J.G.
1997-08-15
The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit applicationmore » guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating text. 38 39 Information provided in this Liquid Effluent Retention Facility and 40 200 Area Effluent Treatment Facility permit application documentation is 41 current as of June 1, 1997.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-04-01
The document is one of six technical handbooks prepared by EPA to help government officials granting permits to build synfuels facilities, synfuels process developers, and other interested parties. They provide technical data on waste streams from synfuels facilities and technologies capable of controlling them. Process technologies covered in the manuals include coal gasification, coal liquefaction by direct and idirect processing, and the extraction of oil from shale. The manuals offer no regulatory guidance, allowing the industry flexibility in deciding how best to comply with environmental regulations.
Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.
Containerless Processing Studies in the MSFC Electrostatic Levitator
NASA Technical Reports Server (NTRS)
Rogers, J. R.; SanSoucie, M. P.
2012-01-01
Levitation or containerless processing represents an important tool in materials research. Levitated specimens are free from contact with a container, which permits studies of deeply undercooled melts, and high-temperature, highly reactive materials. Containerless processing provides data for studies of thermophysical properties, phase equilibria, metastable state formation, microstructure formation, undercooling, and nucleation. Levitation techniques include: acoustic, aero-acoustic, electromagnetic, and electrostatic. In microgravity, levitation can be achieved with greatly reduced positioning forces. Microgravity also reduces the effects of buoyancy and sedimentation in melts. The European Space Agency (ESA) and the German Aerospace Center (DLR) jointly developed an electromagnetic levitator facility (MSL-EML) for containerless materials processing in space. The MSL-EML will be accommodated in the European Columbus Facility on the International Space Station (ISS). The electrostatic levitator (ESL) facility at the Marshall Space Flight Center provides support for the development of containerless processing studies for the ISS. The capabilities of the facility and recent results will be discussed.
Wiesner, Lisa; Prause, Maarten; Lovsin Barle, Ester
2018-03-01
Due to newly introduced EU GMP (Good Manufacturing Practice) guideline for Medicinal Products for Human and Veterinary use, product specific permitted daily exposure (PDE) for toxicological evaluation in multi-purpose facilities are required within a documented process for risk assessment. European Medicines Agency (EMA) guidance on setting PDE limits so far focused on systemic administration routes such as intravenous (IV), oral or inhalation. This article provides guidance on setting PDE values for risk management purposes in multi-purpose facilities for active pharmaceutical ingredients (APIs) applied as topical otic drugs to the outer ear canal. The therewith determined PDE otic, is used for the calculation of maximum safe carry-over (MSC) in manufacturing scenarios where a topical otic product is manufactured followed by another topical otic product.
NPDES Permit: Shiprock Wastewater Treatment Facility, Shiprock, New Mexico
NPDES Permit, Fact Sheet, and Response to Comments explaining EPA's issue of NPDES Permit No. NN0020621 to the Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility, Shiprock, San Juan County, New Mexico.
Destruction of PCB Contaminated Fuel Oil in an Aluminum Melting Furnace
NASA Astrophysics Data System (ADS)
Sonksen, M. K.; Busch, Stephen P.
1985-02-01
Since the 1979 discovery that Alcoa Davenport Works' auxiliary fuel oil supply was contaminated with PCB's, facilities have been provided, and proven, to permit continued use of the oil in a production facility in an environmentally safe manner. This process has several significant benefits. These include energy conservation, with an overall savings of 2.3 × 1011 BTUs and the environmental benefit of destruction of the PCB. The process also eliminates the hazards of transport over long distances.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-08-01
Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF)more » and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.« less
49 CFR 175.25 - Notification at air passenger facilities of hazardous materials restrictions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... restrictions on hazardous materials in baggage. (d) Signage. When the check in process is not conducted... permitted and forbidden hazardous materials may be completed through signage (electronic or otherwise...
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
General Air Quality Permit Request for Coverage: US Silica - Parshall Transload Facility
Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.
NPDES (National Pollution Discharge & Elimination System) Minor Dischargers
As authorized by the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. The NPDES permit program regulates direct discharges from municipal and industrial wastewater treatment facilities that discharge directly into surface waters. The NPDES permit program is part of the Permit Compliance System (PCS) which issues, records, tracks, and regulates point source discharge facilities. Individual homes that are connected to a municipal system, use a septic system, or do not have a surface discharge do not need an NPDES permit. Facilities in PCS are identified as either major or minor. Within the major/minor classification, facilities are grouped into municipals or non-municipals. In many cases, non-municipals are industrial facilities. This data layer contains Minor dischargers. Major municipal dischargers include all facilities with design flows of greater than one million gallons per day; minor dischargers are less that one million gallons per day. Essentially, a minor discharger does not meet the discharge criteria for a major. Since its introduction in 1972, the NPDES permit program is responsible for significant improvements to our Nation's water quality.
43 CFR 13.4 - Terms of permit.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...
43 CFR 13.4 - Terms of permit.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...
43 CFR 13.4 - Terms of permit.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...
Code of Federal Regulations, 2012 CFR
2012-07-01
....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...) Research and development facility (§ 63.101) Routed to a process or route to a process (§ 63.161) Run (§ 63... vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment process (§ 63...
Environmental process improvement feasibility study and demonstration program
NASA Technical Reports Server (NTRS)
Martin, Rodger L.
1994-01-01
This report is the final product of an environmental study conducted by Western Commercial Space Center, Inc. under contract to Tennessee-Calspan Center for Space Transportation and Applied Research. The purpose of this investigation is to accurately document the current environmental and permitting processes associated with commercial space launch activity at Vandenberg AFB, and make recommendations to streamline those processes. The particular areas of interest focus on: identifying applicable Federal, state, and local laws, Department of Defense directives, and Air force regulations; defining the environmental process on Vandenberg AFB and how it relates with other agencies, including Federal and state regulatory agencies; and defining the air quality permit process. Study investigation results are applied to an example Pilot Space Launch Vehicle (PSLV) planning to launch from Vandenberg AFB. The PSLV space hardware is analyzed with respect to environmental and permitting issues associated with vehicle processing, facilities required (existing or new), and launch. The PSLV verified the earlier findings of the study and gave insight into streamlining recommendations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities. It describes the groundwater monitoring criteria for interim status and permitted facilities. It explains monitoring well placement and outlines the three stages of the groundwater monitoring program for permitted facilities.
NPDES Draft Permit for MHA Interpretive Center Wastewater Treatment Facility in North Dakota
Under draft NPDES permit ND0031160, the Mandan, Hidatsa, and Arikara (MHA) Nation Public Works is authorized to discharge from its MHA Interpretive Center wastewater treatment facility to Missouri River as set forth in the permit.
Is a Solvent Reclamation Facility Considered a Chemical Process Plant
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region 9 NPDES Facilities - Waste Water Treatment Plants
Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.
Bubblers Speed Nuclear Waste Processing at SRS
None
2018-05-23
At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.
NPDES Draft Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota
Under NPDES draft permit ND0030813, the Dakota Magic Hotel and Casino WWTF is authorized to discharge, in accordance with the requirements as contained in the provisions of this Permit, from its wastewater treatment facility to the Bois de Sioux.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
... Collection Request (ICR) concerning the standardized permit for RCRA hazardous waste management facilities... Business or other for-profit. Title: Standardized Permit for RCRA Hazardous Waste Management Facilities ICR... Activities; Proposed Collection; Comment Request; Standardized Permit for RCRA Hazardous Waste Management...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-11
... Pollution; Permitting of Grandfathered and Electing Electric Generating Facilities AGENCY: Environmental... permitting procedures for grandfathered electric generating facilities (EGFs). The revisions address a... emissions increases of carbon monoxide (CO) created by the imposition of technology controls to be permitted...
EPA Facility Registry Service (FRS): PCS_NPDES
This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Permit Compliance System (PCS) or the National Pollutant Discharge Elimination System (NPDES) module of the Integrated Compliance Information System (ICIS). PCS tracks NPDES surface water permits issued under the Clean Water Act. This system is being incrementally replaced by the NPDES module of ICIS. Under NPDES, all facilities that discharge pollutants from any point source into waters of the United States are required to obtain a permit. The permit will likely contain limits on what can be discharged, impose monitoring and reporting requirements, and include other provisions to ensure that the discharge does not adversely affect water quality. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NPDES facilities once the PCS or ICIS-NPDES data has been integrated into the FRS database. Additional information on FRS is available
Documents related to Request for Coverage under Stone Quarrying, Crushing and Screening Facilities General Permit, for the Unimin Corporation Silica Sand Rail Transloading Facility on the Fort Berhold Indian Reservation, North Dakota.
Region 9 NPDES Facilities 2012- Waste Water Treatment Plants
Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rogers, Ben C.; Heacker, Fred K.; Shannon, Christopher
2013-07-01
The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sitesmore » and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)« less
33 CFR 126.27 - General permit for handling dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...
33 CFR 126.27 - General permit for handling dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...
33 CFR 126.27 - General permit for handling dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...
33 CFR 126.27 - General permit for handling dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
... Pollution; Permitting of Grandfathered and Electing Electric Generating Facilities AGENCY: Environmental... permitting procedures for grandfathered electric generating facilities (EGFs). The revisions address a... increases of carbon monoxide (CO) created by the imposition of technology controls to be permitted under the...
A software for managing after-hours activities in research user facilities
Camino, F. E.
2017-05-01
Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.
A software for managing after-hours activities in research user facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Camino, F. E.
Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mike
This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistentmore » with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.« less
Emissions model of waste treatment operations at the Idaho Chemical Processing Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schindler, R.E.
1995-03-01
An integrated model of the waste treatment systems at the Idaho Chemical Processing Plant (ICPP) was developed using a commercially-available process simulation software (ASPEN Plus) to calculate atmospheric emissions of hazardous chemicals for use in an application for an environmental permit to operate (PTO). The processes covered by the model are the Process Equipment Waste evaporator, High Level Liquid Waste evaporator, New Waste Calcining Facility and Liquid Effluent Treatment and Disposal facility. The processes are described along with the model and its assumptions. The model calculates emissions of NO{sub x}, CO, volatile acids, hazardous metals, and organic chemicals. Some calculatedmore » relative emissions are summarized and insights on building simulations are discussed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatt, Arpit H; Zhang, Yi Min
A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major sourcemore » threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.« less
15 CFR 971.602 - Significant adverse environmental effects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... testing of recovery equipment, the recovery of manganese nodules in commercial quantities from the deep seabed, and the construction and operation of commercial-scale processing facilities as activities which...
Consent Decree for Southern Minnesota Beet Sugar Cooperative
The defendant violated Sections 301 and 402 of the Clean Water Act when it failed to comply with its permit, issued by the State of Minnesota. SMB discharged untreated wastewater from its processing facility, causing a fish kill in a nearby creek.
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
34 CFR 395.16 - Permit for the establishment of vending facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., the number, location and type of vending machines and other terms and conditions desired to be... 34 Education 2 2010-07-01 2010-07-01 false Permit for the establishment of vending facilities. 395...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shuey, C.
1994-12-31
Contaminant releases from E&P waste management facilities located near residences in three communities in the Four Corners Area -- two in New Mexico and one in Utah -- spurred vocal concern among local residents in recent years. Noxious odors, including hydrogen sulfide, were present in all cases and releases of production wastes and oil spills were prevalent in two of the cases. In all three, residents said they felt powerless to change operator or agency decisions about siting of facilities close to places where people congregate. These cases illustrate the need for regulators to consider facility locations in permitting decisions.more » They also demonstrate the need for creation of statutorily recognized buffer zones around new oil and gas production and processing facilities where releases of pollutants to the air, land and water can reasonably be expected, regardless of the level of pollution control. Buffer zones may be especially important in states where local governments have not elected to adopt land use and zoning requirements that affect the siting of E&P facilities. Agency and corporate sensitivity to siting concerns will engender public confidence in permitting decisions and avoid the needless waste of public and private resources.« less
77 FR 38051 - EPA Activities To Promote Environmental Justice in the Permit Application Process
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... (EPA). In 2011, EPA published Plan EJ 2014, the Agency's overarching strategy for advancing... robust community engagement strategies that recognize the value of community outreach. Pursuant to these strategies, facilities engage actively with the community through environmental initiatives, neighborhood...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... (CP) or combined license (COL) for a nuclear power facility. The ESP process allows resolution of... may reference the permit in an application for a CP or COL. Subsequent Federal Register notices will...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mike Lewis
2013-02-01
This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael G. Lewis
2012-02-01
This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Areamore » Sewage Treatment plant.« less
NPDES Permit for Yellowtail Visitor Center Wastewater Treatment Facility in Montana
NPDES permit MT-0029106 for United States Bureau of Reclamation discharge from its Yellowtail Visitor Center wastewater treatment facility into the Bighorn Lake/Bighorn River in Big Horn County, Montana.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are privately owned vehicles converted for propane carburetion permitted in underground parking facilities? 102-74.280 Section...
NPDES Permit for Keller Transport, Inc. Groundwater Remediation Treatment Facility in Montana
Under National Pollutant Discharge Elimination System permit number MT0030805, Keller Transport, Inc. is authorized to discharge from its groundwater remediation treatment facility in Lake County, Montana, to Flathead Lake.
Potable Water Treatment Facility General Permit (PWTF GP) for Massachusetts & New Hampshire
Documents, links & contacts for the Notice of Availability of the draft NPDES General Permit for Discharges from Potable Water Treatment Facilities in Massachusetts (MAG640000) and New Hampshire (NHG640000).
NPDES Permit for Soap Creek Associates Wastewater Treatment Facility in Montana
Under National Pollutant Discharge Elimination System permit number MT-0023183, Soap Creek Associates, Inc. is authorized to discharge from its wastewater treatment facility located in West, Bighorn County, Montana, to Soap Creek.
NPDES Permit for Lame Deer Lagoon Wastewater Treatment Facility in Montana
Final permit authorizes the Northern Cheyenne Utilities Commission to discharge from its Lame Deer Lagoon wastewater treatment facility located in Rosebud County, Montana to Lame Deer Creek, a tributary to Rosebud Creek.
NPDES Permit for City of Polson Wastewater Treatment Facility in Montana
Under National Pollutant Discharge Elimination System permit number MT-0020559, the City of Polson is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to the Flathead River.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... for Cotton Gins AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is... regulation related to minor NSR preconstruction permitting for particulate matter emissions from cotton ginning facilities. The submitted Cotton Gin regulation provides an alternative preconstruction process...
Race, Wealth, and Solid Waste Facilities in North Carolina
Norton, Jennifer M.; Wing, Steve; Lipscomb, Hester J.; Kaufman, Jay S.; Marshall, Stephen W.; Cravey, Altha J.
2007-01-01
Background Concern has been expressed in North Carolina that solid waste facilities may be disproportionately located in poor communities and in communities of color, that this represents an environmental injustice, and that solid waste facilities negatively impact the health of host communities. Objective Our goal in this study was to conduct a statewide analysis of the location of solid waste facilities in relation to community race and wealth. Methods We used census block groups to obtain racial and economic characteristics, and information on solid waste facilities was abstracted from solid waste facility permit records. We used logistic regression to compute prevalence odds ratios for 2003, and Cox regression to compute hazard ratios of facilities issued permits between 1990 and 2003. Results The adjusted prevalence odds of a solid waste facility was 2.8 times greater in block groups with ≥50% people of color compared with block groups with < 10% people of color, and 1.5 times greater in block groups with median house values < $60,000 compared with block groups with median house values ≥$100,000. Among block groups that did not have a previously permitted solid waste facility, the adjusted hazard of a new permitted facility was 2.7 times higher in block groups with ≥50% people of color compared with block groups with < 10% people of color. Conclusion Solid waste facilities present numerous public health concerns. In North Carolina solid waste facilities are disproportionately located in communities of color and low wealth. In the absence of action to promote environmental justice, the continued need for new facilities could exacerbate this environmental injustice. PMID:17805426
NPDES Permit for City of Wagner Wastewater Treatment Facility in South Dakota
Under NPDES permit SD-0020184, the City of Wagner, South Dakota is authorized to discharge from its wastewater treatment facility in Charles Mix County, South Dakota, to an unnamed tributary of Choteau Creek.
NPDES Permit for Town of Hot Springs Wastewater Treatment Facility in Montana
Under NPDES permit MT0020591, the Town of Hot Springs, Montana, is authorized to discharge from its wastewater treatment facility located in Sanders County, Montana, to a ditch discharging to Hot Springs Creek.
NPDES Permit for Charlo Wastewater Treatment Facility in Montana
Under NPDES permit MT-0022551, the Consolidated Charlo-Lake County Water & Sewer District is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to an unnamed swale that runs to Dublin Gulch.
10 CFR 770.2 - What real property does this part cover?
Code of Federal Regulations, 2010 CFR
2010-01-01
... sale or lease at defense nuclear facilities, for the purpose of permitting economic development. (b... permitting economic development. ....2 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC...
7 CFR 457.142 - Northern potato crop insurance provisions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... business of buying or processing potatoes, that possesses all the licenses and permits required by the state in which it operates, and has the facilities to accept the potatoes purchased. Certified seed. Potatoes that were entered into the potato certified seed program and that meet all requirements for...
7 CFR 457.142 - Northern potato crop insurance provisions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... business of buying or processing potatoes, that possesses all the licenses and permits required by the state in which it operates, and has the facilities to accept the potatoes purchased. Certified seed. Potatoes that were entered into the potato certified seed program and that meet all requirements for...
7 CFR 457.142 - Northern potato crop insurance provisions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... business of buying or processing potatoes, that possesses all the licenses and permits required by the state in which it operates, and has the facilities to accept the potatoes purchased. Certified seed. Potatoes that were entered into the potato certified seed program and that meet all requirements for...
NPDES Permit for Woodcock Home Addition Wastewater Treatment Facility in Montana
Under NPDES permit MT-0030554, the Salish and Kootenai Housing Authority is authorized to discharge from its Woodcock Home Addition Wastewater Treatment Facility in Lake County, Montana, to a swale draining to Middle Crow Creek.
Report #2007-P-00023, May 14, 2007. EPA did not provide effective enforcement oversight of major facilities with National Pollutant Discharge Elimination System permits in long-term significant noncompliance.
NPDES Permit for Rosebud Casino and Hotel Wastewater Treatment Facility in South Dakota
Under NPDES permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.
Evolving policies to regulate pollution from animal feeding operations.
Centner, T J
2001-11-01
Due to concentrations of animals at large facilities, animal feeding operations (AFOs) have emerged as a major potential source of water pollution. The federal government regulates concentrated animal feeding operations under its point-source pollution permitting regulations. A major determinant of whether an operation must apply for a permit is the number of animals at an individual lot or facility. This paper examines federal mandatory controls and voluntary guidelines that seek to reduce contaminant pollution from AFOs. Land treatment practices are delineated due to their importance in reducing the injurious by-products of agricultural production. An evaluation of proposed revisions to federal regulations on confined animal feeding operations suggests they diverge from their goal of controlling water pollution. Federal regulations focus on the size of operation and amount of manure governed by the permitting process to the exclusion of other criteria related to the impairment of water quality. Given the uncertainties about the amount of pollution from AFOs, lack of enforcement of existing regulations, localization of problems, and possible alternatives for addressing the pollution, more demanding federal regulations may not form an appropriate response.
Environmental factor(tm) system: RCRA hazardous waste handler information (on CD-ROM). Data file
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
Environmental Factor(trademark) RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity, and compliance history for facilities found in the EPA Research Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management, and minimization by companies who are large quantity generators; and (3) Data on the waste management practices of treatment, storage, and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action, or violation information, TSD status, generator and transporter status, and more. (2) View compliance information - dates of evaluation, violation, enforcement, and corrective action. (3) Lookup facilities by waste processing categories of marketing, transporting, processing, and energy recovery. (4) Use owner/operator information and names, titles, and telephone numbers of project managers for prospecting. (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving, and exporting.« less
NPDES Draft Permit for Southern Ute Indian Tribe Wastewater Treatment Facility in Colorado
Under NPDES draft permit number CO-0022853, the Southern Ute Indian Tribe is authorized to discharge from its wastewater treatment facility in La Plata County, Colorado,to Rock Creek, a tributary of the Los Pinos River.
30 CFR 780.38 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
30 CFR 784.30 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
Synthetic Minor NSR Permit: Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility
This page contains the response to public comments and final synthetic minor NSR permit for the Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility, operated by Chemtrade Logistics and located on the Wind River Indian Reservation in Fremont County
NPDES Permit for City of Eagle Butte Wastewater Treatment Facility in South Dakota
Under NPDES permit SD-0020192, the City of Eagle Butte, South Dakota, is authorized to discharge from its wastewater treatment facility within the Cheyenne River Sioux Reservation in Dewey County, South Dakota, to Green Grass Creek.
Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire
Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.
NPDES Permit for Yellowtail Dam Wastewater Treatment Facility in Montana
Under NPDES permit MT-0022993, the U.S. Bureau of Reclamation is authorized to discharge from its wastewater treatment facility located at the Yellowtail Dam Field Office in Big Horn County, Montana, to the Yellowtail Afterbay Reservoir/Bighorn River.
Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility; Draft NPDES Permit
EPA is proposing to issue a NPDES permit (No. NN0020621) to Navajo Tribal Utility Authority (NTUA) for the Shiprock wastewater treatment facility in San Juan County, New Mexico, within the northeastern portion of the Navajo Nation.
NPDES Permit for Fort Carson Wastewater Treatment Facility in Colorado
Under NPDES permit no. CO-0021181 the United States Department of the Army, Fort Carson, in authorized to discharge from its sanitary wastewater treatment facility in El Paso County, Colorado, to Clover Ditch, a tributary of Fountain Creek.
NASA Technical Reports Server (NTRS)
Kephart, Nancy
1992-01-01
The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidifcation conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment, and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace.
Collaborative Mission Design at NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.
2005-01-01
NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.
Hanford facility dangerous waste permit application, PUREX storage tunnels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haas, C. R.
1997-09-08
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).
This page contains the current effective synthetic minor NSR permit for the Van Hook Crude Terminal, LLC, Van Hook Crude Terminal/Rail Loading Facility, located on the Fort Berthold Indian Reservation in Mountrail County, ND.
NPDES Permit for U.S. Air Force Academy Wastewater Treatment Facility in Colorado
Under NPDES permit CO-0020974, the U.S. Air Force Academy is authorized to discharge from its wastewater treatment facility in El Paso County, Colorado, to Non-Potable Reservoir No. 1 on Lehman Run and to Monument Creek.
NPDES Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota
Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.
NPDES Permit for Town of Lodge Grass Wastewater Treatment Facility in Montana
Under National Pollutant Discharge Elimination System permit number MT0021890, the Town of Lodge Grass is authorized to discharge from from its wastewater treatment facility in Big Horn County to an unnamed slough to the Little Bighorn River.
NPDES Permit for the St. Ignatius-Southside Wastewater Treatment Facility in Montana
Under NPDES permit MT-0029017, the Salish and Kootenai Housing Authority of the Confederated Salish and Kootenai Tribes is authorized to discharge from its wastewater treatment facility in Lake County, Montana to an unnamed tributary of Sabine Creek.
Memory Network For Distributed Data Processors
NASA Technical Reports Server (NTRS)
Bolen, David; Jensen, Dean; Millard, ED; Robinson, Dave; Scanlon, George
1992-01-01
Universal Memory Network (UMN) is modular, digital data-communication system enabling computers with differing bus architectures to share 32-bit-wide data between locations up to 3 km apart with less than one millisecond of latency. Makes it possible to design sophisticated real-time and near-real-time data-processing systems without data-transfer "bottlenecks". This enterprise network permits transmission of volume of data equivalent to an encyclopedia each second. Facilities benefiting from Universal Memory Network include telemetry stations, simulation facilities, power-plants, and large laboratories or any facility sharing very large volumes of data. Main hub of UMN is reflection center including smaller hubs called Shared Memory Interfaces.
NASA Technical Reports Server (NTRS)
Kriegler, F. J.
1973-01-01
The improvement and extension of the capabilities of the Environmental Research Institute of Michigan processing facility in handling multispectral data are discussed. Improvements consisted of implementing hardware modifications which permitted more rapid access to the recorded data through improved numbering and indexing of such data. In addition, techniques are discussed for handling data from sources other than the ERIM M-5 and M-7 scanner systems.
40 CFR 239.2 - Scope and definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... action, and financial assurance of Subtitle D regulated facilities. Permit documents means permit...) regulated facilities under the state's jurisdiction. (b) Definitions. (1) For purposes of this part... regulated under section 4010(c) of Subtitle D of RCRA comply with the requirements of the approved state...
Potable Water Treatment Facility General Permit (PWTF GP) ...
2017-08-28
The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.
33 CFR 126.33 - Penalties for handling dangerous cargo without permit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.33 - Penalties for handling dangerous cargo without permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...
33 CFR 126.33 - Penalties for handling dangerous cargo without permit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...
33 CFR 126.33 - Penalties for handling dangerous cargo without permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.33 - Penalties for handling dangerous cargo without permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...
NPDES Permit for F.E. Warren Air Force Base Missile Launch Facilities in Colorado
Under NPDES permit CO-0034789, the USAF, F. E. Warren Air Force Base, is authorized to discharge from the Missile Launch Facilities located in northeastern Colorado to unnamed drainage ditches located in the Cedar Creek and Pawnee Creek drainage basins.
Evoqua RCRA Permit Application and Draft Permit Documents
Documents pertaining to the proposed RCRA permit for the Evoqua Water Technologies LLC carbon regeneration facility located on the Colorado River Indian Tribes (CRIT) reservation near Parker, Arizona.
Hanford facility dangerous waste permit application, general information portion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, C.B.
1998-05-19
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion ismore » broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).« less
Hanford solid-waste handling facility strategy
NASA Astrophysics Data System (ADS)
Albaugh, J. F.
1982-05-01
Prior to 1970, transuranic (TRU) solid waste was disposed of at Hanford by shallow land burial. Since 1970, TRU solid waste has been stored in near surface trenches designed to facilitate retrieval after twenty year storage period. Current strategy calls for final disposal in a geologic repository. Funding permitting, in 1983, certification of newly generated TRU waste to the Waste Isolation Pilot Plant (WIPP) criteria for geologic disposal will be initiated. Certified and uncertified waste will continue to be stored at Hanford in retrievable storage until a firm schedule for shipment to WIPP is developed. Previously stored wastes retrieved for geologic disposal and newly generated uncertified waste requires processing to assure compliance with disposal criteria. A facility to perform this function is being developed. A study to determine the requirements of this Waste Receiving and Processing (WRAP) Facility is currently being conducted.
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
NPDES Permit for Dakota Magic Casino and Hotel Wastewater Treatment Facility in North Dakota
Under NPDES permit ND0030813, the the Dakota Magic Casino and Hotel is authorized is authorized to discharge from its wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.
40 CFR 256.63 - Requirements for public participation in the permitting of facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...
40 CFR 256.63 - Requirements for public participation in the permitting of facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...
40 CFR 256.63 - Requirements for public participation in the permitting of facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...
40 CFR 256.63 - Requirements for public participation in the permitting of facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
...-0137; Applications for Single Use Permits and Registration of Production Facilities (CITES) AGENCY...-0137. Title: Applications for Single Use Permits and Registration of Production Facilities (CITES), 50... import or export of CITES-listed species, the Management Authority and Scientific Authority must make...
Notices of Intent (NOIs) submitted to EPA for coverage under the NPDES general permit for discharges from oil and gas exploration facilities on the outer continental shelf in the Chukchi Sea off Alaska.
Documents related to approved request for coverage under the Stone Quarrying, Crushing and Screening Facilities General Permit for Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation located in McKinley and San Juan Counties, NM.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... for Control of Air Pollution; Permitting of Grandfathered Facilities AGENCY: Environmental Protection... grandfathered facilities obtain specific permits which include emission control methods to achieve mandated... or contact information unless you provide it in the body of your comment. If you send an email...
Hydroelectric Generating Facilities General Permit ...
2017-08-28
The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... Remediation Facility Discharges in the Commonwealth of Massachusetts (Including Both Commonwealth and Indian Country Lands) and the State of New Hampshire: The Remediation General Permits (RGP) AGENCY: Environmental... Discharge Elimination System (NPDES) general permits for remediation facility discharges to certain waters...
43 CFR 13.2 - Application for permit.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...
43 CFR 13.2 - Application for permit.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...
43 CFR 13.2 - Application for permit.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...
Air quality assessment for land disposal of industrial wastes
NASA Astrophysics Data System (ADS)
Shen, Thomas T.
1982-07-01
Air pollution from hazardous waste landfills and lagoons is largely unknown. Routine monitoring of toxic air contaminants associated with hazardous waste facilities is difficult and very costly. The method presented in this paper would be useful for air quality assessment in the absence of monitoring data. It may be used as a screening process to examine the question of whether or not volatilization is considered to be significant for a given contaminant and also to evaluate permit applications for new hazardous waste facilities concerning waste volatilization problems.
Environmental Factor(tm) system: RCRA hazardous waste handler information (on cd-rom). Database
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-04-01
Environmental Factor(tm) RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity and compliance history for facilities found in the EPA Resource Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management and minimization by companies who are large quantity generators, and (3) Data on the waste management practices of treatment, storage and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action or violation information, TSD status, generator and transporter status and more; (2) View compliance information - dates of evaluation, violation, enforcement and corrective action; (3) Lookup facilities by waste processing categories of marketing, transporting, processing and energy recovery; (4) Use owner/operator information and names, titles and telephone numbers of project managers for prospecting; and (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving and exporting. Hotline support is also available for no additional charge.« less
Environmental Factor{trademark} system: RCRA hazardous waste handler information
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
Environmental Factor{trademark} RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity and compliance history for facilities found in the EPA Resource Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management and minimization by companies who are large quantity generators, and (3) Data on the waste management practices of treatment, storage and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action or violation information, TSD status, generator and transporter status and more; (2) View compliance information -- dates of evaluation, violation, enforcement and corrective action; (3) Lookup facilities by waste processing categories of marketing, transporting, processing and energy recovery; (4) Use owner/operator information and names, titles and telephone numbers of project managers for prospecting; and (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving and exporting. Hotline support is also available for no additional charge.« less
2008-01-01
submicron powders in situ. Facilities to process powder into bulk specimens by hot and cold isostatic pressing permit a variety of consolidation...two types of nanoparticles, (YxHo1–x)2O3 and Cu - Ba-Ho-Y (exact stoichiometry yet to be determined), are formed during the deposition process ... Properties by Tailor- ing Nanoparticles in Holmium-doped YBa 2 Cu 3 O 7-d Superconductors 187 Molecular Memory Circuits Using a Virus as a Template 189
DOE Office of Scientific and Technical Information (OSTI.GOV)
Name, No
This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in themore » initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.« less
Consolidated Quarterly Report: Number of potential release sites subject to corrective action
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John R.
2017-04-01
This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.
40 CFR 270.65 - Research, development, and demonstration permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...
40 CFR 270.65 - Research, development, and demonstration permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...
18 CFR 50.11 - General conditions applicable to permits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...
40 CFR 270.40 - Transfer of permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...
40 CFR 270.40 - Transfer of permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PERMIT Financial Requirements § 267.151 Wording of the instruments. (a) The chief financial officer of an owner or operator of a facility with a standardized permit who uses a financial test to demonstrate financial assurance for that facility must complete a letter as specified in § 267.143(f) of this chapter...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mike
This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2013, through October 31, 2014. The report contains, as applicable, the following information; Site description; Facility and system description; Permit required monitoring data and loading rates; Status of compliance conditions and activities; and Discussion of the facility’s environmental impacts. The current permit expires on March 16, 2015. A permit renewal application was submitted to Idaho Department of Environmental Quality on September 15, 2014. Duringmore » the 2014 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. Seepage testing of the three lagoons was performed between August 26, 2014 and September 22, 2014. Seepage rates from Lagoons 1 and 2 were below the 0.25 inches/day requirement; however, Lagoon 3 was above the 0.25 inches/day. Lagoon 3 has been isolated and is being evaluated for future use or permanent removal from service.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Os, Herman W.A. van, E-mail: h.w.a.van.os@rug.nl; Herber, Rien, E-mail: rien.herber@rug.nl; Scholtens, Bert, E-mail: l.j.r.scholtens@rug.nl
We investigate how the decision support system ‘Modular Evaluation Method Subsurface Activities’ (MEMSA) can help facilitate an informed decision-making process for permit applications of subsurface activities. To this end, we analyze the extent the MEMSA approach allows for a dialogue between stakeholders in a transparent manner. We use the exploration permit for the underground gas storage facility at the Pieterburen salt dome (Netherlands) as a case study. The results suggest that the MEMSA approach is flexible enough to adjust to changing conditions. Furthermore, MEMSA provides a novel way for identifying structural problems and possible solutions in permit decision-making processes formore » subsurface activities, on the basis of the sensitivity analysis of intermediate rankings. We suggest that the planned size of an activity should already be specified in the exploration phase, because this would allow for a more efficient use of the subsurface as a whole. We conclude that the host community should be involved to a greater extent and in an early phase of the permit decision-making process, for example, already during the initial analysis of the project area of a subsurface activity. We suggest that strategic national policy goals are to be re-evaluated on a regular basis, in the form of a strategic vision for the subsurface, to account for timing discrepancies between the realization of activities and policy deadlines, because this discrepancy can have a large impact on the necessity and therefore acceptance of a subsurface activity.« less
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Dolphin and Wahoo Fishery Off the Atlantic States § 622.270 Permits. (a) Commercial vessel permits. (1) For a person aboard... the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must...
Wave Energy Research, Testing and Demonstration Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Batten, Belinda
2014-09-30
The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean testmore » berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...
2007-05-16
and silicon carbide; spent elastic abrasive media; rags and wipes from the NDI process ; and unused scraps of TIG welding wire. Dust from the thermal...used, which would not be expected to produce regulated air emissions. For this process , no air quality permit updates are anticipated. • Welding ...The electron beam welding equipment would not be expected to produce regulated air emissions. The tungsten inert gas ( TIG ) welding equipment would
Optimizing liquid effluent monitoring at a large nuclear complex.
Chou, Charissa J; Barnett, D Brent; Johnson, Vernon G; Olson, Phil M
2003-12-01
Effluent monitoring typically requires a large number of analytes and samples during the initial or startup phase of a facility. Once a baseline is established, the analyte list and sampling frequency may be reduced. Although there is a large body of literature relevant to the initial design, few, if any, published papers exist on updating established effluent monitoring programs. This paper statistically evaluates four years of baseline data to optimize the liquid effluent monitoring efficiency of a centralized waste treatment and disposal facility at a large defense nuclear complex. Specific objectives were to: (1) assess temporal variability in analyte concentrations, (2) determine operational factors contributing to waste stream variability, (3) assess the probability of exceeding permit limits, and (4) streamline the sampling and analysis regime. Results indicated that the probability of exceeding permit limits was one in a million under normal facility operating conditions, sampling frequency could be reduced, and several analytes could be eliminated. Furthermore, indicators such as gross alpha and gross beta measurements could be used in lieu of more expensive specific isotopic analyses (radium, cesium-137, and strontium-90) for routine monitoring. Study results were used by the state regulatory agency to modify monitoring requirements for a new discharge permit, resulting in an annual cost savings of US dollars 223,000. This case study demonstrates that statistical evaluation of effluent contaminant variability coupled with process knowledge can help plant managers and regulators streamline analyte lists and sampling frequencies based on detection history and environmental risk.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mike Lewis
2014-02-01
This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plantmore » and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.« less
Rosebud Casino and Hotel NPDES Proposed Permit
Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.
Point geospatial dataset representing locations of NPDES outfalls/dischargers for facilities which generally represent the site of the discharge. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from treated waste water that is discharged into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more dischargers. The location represents the discharge point of a discrete conveyance such as a pipe or man made ditch.
2004-01-22
KENNEDY SPACE CENTER, FLA. - A worker in the Orbiter Processing Facility checks the open hatch of the airlock in Discovery’s payload bay. The airlock is normally located inside the middeck of the spacecraft’s pressurized crew cabin. The airlock is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, donning and communications. The outer hatch isolates the airlock from the unpressurized payload bay when closed and permits the EVA crew members to exit from the airlock to the payload bay when open.
WIPP Hazardous Waste Facility Permit Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kehrman, B.; Most, W.
2006-07-01
The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification requestmore » that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of dollars [3]. Combining both the chap. 311 and RH TRU waste permit modification requests allows for both the regulator and DOE to expedite action on the modification requests. The Combined PMR reduces costs by having only one administrative process for both modification requests. (authors)« less
The interactive astronomical data analysis facility - image enhancement techniques to Comet Halley
NASA Astrophysics Data System (ADS)
Klinglesmith, D. A.
1981-10-01
PDP 11/40 computer is at the heart of a general purpose interactive data analysis facility designed to permit easy access to data in both visual imagery and graphic representations. The major components consist of: the 11/40 CPU and 256 K bytes of 16-bit memory; two TU10 tape drives; 20 million bytes of disk storage; three user terminals; and the COMTAL image processing display system. The application of image enhancement techniques to two sequences of photographs of Comet Halley taken in Egypt in 1910 provides evidence for eruptions from the comet's nucleus.
Electrostatic Levitation: A Tool to Support Materials Research in Microgravity
NASA Technical Reports Server (NTRS)
Rogers, Jan; SanSoucie, Mike
2012-01-01
Containerless processing represents an important topic for materials research in microgravity. Levitated specimens are free from contact with a container, which permits studies of deeply undercooled melts, and high-temperature, highly reactive materials. Containerless processing provides data for studies of thermophysical properties, phase equilibria, metastable state formation, microstructure formation, undercooling, and nucleation. The European Space Agency (ESA) and the German Aerospace Center (DLR) jointly developed an electromagnetic levitator facility (MSL-EML) for containerless materials processing in space. The electrostatic levitator (ESL) facility at the Marshall Space Flight Center provides support for the development of containerless processing studies for the ISS. Apparatus and techniques have been developed to use the ESL to provide data for phase diagram determination, creep resistance, emissivity, specific heat, density/thermal expansion, viscosity, surface tension and triggered nucleation of melts. The capabilities and results from selected ESL-based characterization studies performed at NASA's Marshall Space Flight Center will be presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... ENVIRONMENTAL PROTECTION AGENCY [Petition IV-2011-1; FRL-9734-2] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority's Shawnee Fossil... Valley Authority for its Shawnee Fossil Plant (SFP) facility located in West Paducah, Kentucky. This...
50 CFR 25.41 - Who issues refuge permits?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Who issues refuge permits? 25.41 Section... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Permits § 25.41 Who issues refuge permits? We authorize the refuge manager of the facility where an activity is to take place to issue...
NASA Astrophysics Data System (ADS)
1992-05-01
The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).
NASA Technical Reports Server (NTRS)
1992-01-01
The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gallegos, Gretchen M.; Terusaki, Stan H.
2013-12-01
An ecological risk assessment is required as part of the Resource Recovery and Conservation Act (RCRA) permit renewal process for Miscellaneous Units subject to 22 CCR 66270.23. This risk assessment is prepared in support of the RCRA permit renewal for the Explosives Waste Treatment Facility (EWTF) at Site 300 of the Lawrence Livermore National Laboratory (LLNL). LLNL collected soil samples and used the resulting data to produce a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. The scoping-levelmore » ecological risk assessment provides a framework to determine the potential interaction between ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF. A scoping-level ecological risk assessment includes the step of conducting soil sampling in the area of the treatment units. The Sampling Plan in Support of the Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory, (Terusaki, 2007), outlines the EWTF project-specific soil sampling requirements. Soil samples were obtained and analyzed for constituents from four chemical groups: furans, explosives, semi-volatiles and metals. Analytical results showed that furans, explosives and semi-volatiles were not detected; therefore, no further analysis was conducted. The soil samples did show the presence of metals. Soil samples analyzed for metals were compared to site-wide background levels, which had been developed for site -wide cleanup activities pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Total metal concentrations from 28 discrete soil samples obtained in the EWTF area were all below CERCLA-developed background levels. Therefore, following DTSC 1996 guidance, the EWTF hazardous waste treatment units exit the ecological risk evaluation process upon completion of the requirements of a scoping-level assessment report. This summary report documents that the requirements of a scoping-level assessment have been met.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
... General NPDES Permit for Facilities Related to Oil and Gas Extraction AGENCY: Environmental Protection... (GP) regulating activities related to the extraction of oil and gas on the North Slope of the Brooks... intended to regulate activities related to the extraction of oil and gas on the North Slope of the Brooks...
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... facilities authorized by Presidential Permit No. PP-22, as amended, include seven single conductor 132 kilovolt (kV) submarine cables and three single conductor 260 kV DC submarine cables. These cables do not...
40 CFR 147.2927 - Permit modification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... are substantial changes to the facility or activity which occurred after permit issuance that justify... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Permit modification. 147.2927 Section 147.2927 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...
Automation of electromagnetic compatability (EMC) test facilities
NASA Technical Reports Server (NTRS)
Harrison, C. A.
1986-01-01
Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.
CXA La Paloma, LLC: UIC Class I Permit No.CA10710001
Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.
Sources Approved for Coverage under the SQCS General Permit in Region 8
The sources on Indian country reservation lands that the Region 8 has approved for coverage under the General Air Quality Permit for New and Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country (SQCS General Permit).
Wave energy: a Pacific perspective.
Paasch, Robert; Ruehl, Kelley; Hovland, Justin; Meicke, Stephen
2012-01-28
This paper illustrates the status of wave energy development in Pacific rim countries by characterizing the available resource and introducing the region's current and potential future leaders in wave energy converter development. It also describes the existing licensing and permitting process as well as potential environmental concerns. Capabilities of Pacific Ocean testing facilities are described in addition to the region's vision of the future of wave energy.
Test Operations Procedure (TOP) 5-2-521 Pyrotechnic Shock Test Procedures
2007-11-20
Clipping will produce a signal that resembles a square wave . (2) Filters are used to limit the frequency bandwidth of the signal . Low pass filters...video systems permit observation of explosive items under test. c. Facilities to perform non-destructive inspections such as x-ray, ultrasonic , magna...test. (1) Accelerometers (2) Signal Conditioners (3) Digital Recording System (4) Data Processing System with hardcopy output
Hanford Facility Dangerous Waste Permit Application for T Plant Complex
DOE Office of Scientific and Technical Information (OSTI.GOV)
BARNES, B.M.
2002-09-01
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the T Plant Complex (this document, DOE/RL-95-36). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agencymore » (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the T Plant Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the T Plant Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text.« less
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Permit Limit and Monitoring Requirements Report Help ...
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, G.C.
The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...
47 CFR 95.1107 - Authorized locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO... care facility provided the facility is located anywhere a CB station operation is permitted under § 95... associated with a health care facility. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, G.E.; Culp, J.C.; Jenness, S.R.
1997-12-31
Treatment and disposal of explosives and munitions items have represented a significant management challenge for Department of Defense (DOD) facilities, particularly in light of increased regulatory scrutiny under the Federal Facilities Compliance Act provisions of the Resource Conservation and Recovery Act (RCRA). Subpart X of the RCRA regulations for storage, treatment, and disposal of hazardous wastes was drafted specifically to address explosive wastes. Until just recently, any DOD facility that was performing open burning/open detonation (OB/OD) of explosives was doing so under interim status for RCRA Part B Subpart X. In August 1996, Eglin Air Force Base (AFB), Florida becamemore » the first Air Force facility to be issued a final Part B Subpart X permit to perform OB/OD operations at two Eglin AFB active test ranges. This presentation will examine how Eglin AFB worked proactively with the State of Florida Department of Environmental Protection (FDEP) and EPA Region IV to develop permit conditions based upon risk assessment considerations for both air and ground-water exposure pathways. It will review the role of air emissions and air dispersion modeling in assessing potential exposure and impacts to both onsite and offsite receptors, and will discuss how air monitoring will be used to assure that the facility remains in compliance during OB/OD activities. The presentation will also discuss the soil and ground-water characterization program and associated risk assessment provisions for quarterly ground-water monitoring to assure permit compliance. The project is an excellent example of how a collaborative working relationship among the permittee, their consultant and state, and EPA can result in an environmentally protective permit that assures operational flexibility and mission sensitivity.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Departmentmore » of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.« less
[OR management - Checklists for OR-design for OR-managers - results of a workshop].
Bock, Matthias; Steinmeyer-Bauer, Klaus; Schüpfer, Guido
2014-10-01
The construction of an operating room (OR) suite represents an important intermediate- and long term investment. The planning process starts with the quantitative estimation of the procedures to be carried out which defines the operative capacity for the life time of the facility. This permits the calculation of the number of ORs and the definition of the resources for the recovery room, the intermediate care and intensive care unit.The projectors should integrate the new facility into workflow, workload and logistics of the entire hospital. The simulation flow of patients and accompanying persons and of the routes of the personnel is helpful for this purpose. Separating structures for outpatients from those for inpatients and avoiding de-centralized rooms helps designing an efficient and safe OR suite.The design of the single ORs should be flexible to permit changes or technical innovations during their use period. Mobile equipment is preferable to permanently installed devices. We consider an expanse of at least 45 m(2) for any location adequate for general ORs. The space requirements are elevated for hybrid ORs and rooms dedicated for robotic surgery.The design of the suite should separate the flow of personnel, patients and logistics. Surgical instruments and their logistics should be standardized. Dedicated locations for a simultaneous preparation of the instrumentation tables permit parallel processing. Thus an adequate capacity of preparation rooms and storage rooms is necessary. Dressing rooms, rest rooms, showers and lounges are important for the working conditions and should be planned in an adequate size and number. © Georg Thieme Verlag Stuttgart · New York.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... the conditions of the Beaufort general permit are stringent enough to comply with State water quality... conditions than what is proposed in the Beaufort general permit to ensure compliance with State water quality... Clean Water Act (CWA or ``the Act''), 33 U.S.C. 1342. State Certification of Beaufort General Permit...
Animal research facility for Space Station Freedom
NASA Technical Reports Server (NTRS)
Bonting, Sjoerd L.
1992-01-01
An integrated animal research facility is planned by NASA for Space Station Freedom which will permit long-term, man-tended experiments on the effects of space conditions on vertebrates. The key element in this facility is a standard type animal habitat which supports and maintains the animals under full bioisolation during transport and during the experiment. A holding unit accommodates the habitats with animals to be maintained at zero gravity; and a centrifuge, those to be maintained at artificial gravity for control purposes or for gravity threshold studies. A glovebox permits handling of the animals for experimental purposes and for transfer to a clean habitat. These facilities are described, and the aspects of environmental control, monitoring, and bioisolation are discussed.
78 FR 46402 - Issuance of a Presidential Permit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-31
...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...
30 CFR 778.22 - Facilities or structures used in common.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED...
10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental...
ICIS-NPDES Permit Limit and Discharge Monitoring Report ...
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Multi-discipline Waste Acceptance Process at the Nevada National Security Site - 13573
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carilli, Jhon T.; Krenzien, Susan K.
2013-07-01
The Nevada National Security Site low-level radioactive waste disposal facility acceptance process requires multiple disciplines to ensure the protection of workers, the public, and the environment. These disciplines, which include waste acceptance, nuclear criticality, safety, permitting, operations, and performance assessment, combine into the overall waste acceptance process to assess low-level radioactive waste streams for disposal at the Area 5 Radioactive Waste Management Site. Four waste streams recently highlighted the integration of these disciplines: the Oak Ridge Radioisotope Thermoelectric Generators and Consolidated Edison Uranium Solidification Project material, West Valley Melter, and classified waste. (authors)
Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF
Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of... golden crab harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...
49 CFR 1155.26 - Transfer and termination of a land-use-exemption permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Transfer and termination of a land-use-exemption permit. 1155.26 Section 1155.26 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.26 Transfer and...
300 area TEDF NPDES Permit Compliance Monitoring Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1995-09-05
This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.
Superfluid Helium Tanker (SFHT) study
NASA Technical Reports Server (NTRS)
Eberhardt, Ralph N.; Dominick, Sam M.; Anderson, John E.; Gille, John P.; Martin, Tim A.; Marino, John S.; Paynter, Howard L.; Traill, R. Eric; Herzl, Alfred; Gotlib, Sam
1988-01-01
Replenishment of superfluid helium (SFHe) offers the potential of extending the on-orbit life of observatories, satellite instruments, sensors and laboratories which operate in the 2 K temperature regime. A reference set of resupply customers was identified as representing realistic helium servicing requirements and interfaces for the first 10 years of superfluid helium tanker (SFHT) operations. These included the Space Infrared Telescope Facility (SIRTF), the Advanced X-ray Astrophysics Facility (AXAF), the Particle Astrophysics Magnet Facility (Astromag), and the Microgravity and Materials Processing Sciences Facility (MMPS)/Critical Point Phenomena Facility (CPPF). A mixed-fleet approach to SFHT utilization was considered. The tanker permits servicing from the Shuttle cargo bay, in situ when attached to the OMV and carried to the user spacecraft, and as a depot at the Space Station. A SFHT Dewar ground servicing concept was developed which uses a dedicated ground cooling heat exchanger to convert all the liquid, after initial fill as normal fluid, to superfluid for launch. This concept permits the tanker to be filled to a near full condition, and then cooled without any loss of fluid. The final load condition can be saturated superfluid with any desired ullage volume, or the tank can be totally filed and pressurized. The SFHT Dewar and helium plumbing system design has sufficient component redundancy to meet fail-operational, fail-safe requirements, and is designed structurally to meet a 50 mission life usage requirement. Technology development recommendations were made for the selected SFHT concept, and a Program Plan and cost estimate prepared for a phase C/D program spanning 72 months from initiation through first launch in 1997.
Aging of Polymers and Composites.
1981-07-21
used to characterize the aging processes in the epoxy resin system, MY720 (mainly tetraglycidaldiaminodiphenyl methane, Ciba-Geigy) cured with Eporal...or nitrogen is used to purge the sample chamber; however, other gases can be used . The sample stage incorporates two matched heaters and Signal ...mass spectral data from the PAMS experiments. The hardware used in this facility is shown in Figure D2. The multiplexer permits the use of one analog
2004-01-22
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, a cameraman films part of Discovery’s payload bay for a special feature on the KSC Web. In the background is the open hatch of the airlock, located inside the middeck of the spacecraft’s pressurized crew cabin. The airlock is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, donning and communications. The outer hatch isolates the airlock from the unpressurized payload bay when closed and permits the EVA crew members to exit from the airlock to the payload bay when open.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... Protection Agency. ACTION: Notice of Final NPDES General Permit. SUMMARY: The Director of the Water Quality... Extraction Point Source Category as authorized by section 402 of the Clean Water Act, 33 U.S.C. 1342 (CWA... change to the proposed permit. A copy of the Region's responses to comments and the final permit may be...
Tianyi, Frank-Leonel; Tochie, Joel Noutakdie; Agbor, Valirie Ndip; Kadia, Benjamin Momo
2018-03-01
HIV testing is an invaluable entry point to prevention, care and treatment services for people living with HIV and AIDS. Poor adherence to recommended protocols and guidelines reduces the performance of rapid diagnostic tests, leading to misdiagnosis and poor estimation of HIV seroprevalence. This study seeks to evaluate the adherence of primary healthcare facilities in Cameroon to recommended HIV counselling and testing (HCT) procedures and the impact this may have on the reliability of HIV test results. This will be an analytical cross-sectional study involving primary healthcare facilities from all the 10 regions of Cameroon, selected by a multistaged random sampling of primary care facilities in each region. The study will last for 9 months. A structured questionnaire will be used to collect general information concerning the health facility, laboratory and other departments involved in the HCT process. The investigators will directly observe at least 10 HIV testing processes in each facility and fill out the checklist accordingly. Clearance has been obtained from the National Ethical Committee to carry out the study. Informed consent will be sought from the patients to observe the HIV testing process. The final study will be published in a peer-reviewed journal and the findings presented to health policy-makers and the general public. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Search Results Help - Industrial Stormwater | ECHO | US EPA
Help page for Industrial Stormwater program facility search, which provides data about Clean Water Act discharge permits with an industrial stormwater component, including EPA Industrial Stormwater Multi-Sector General Permits.
49 CFR 655.73 - Access to facilities and records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Access to facilities and records. 655.73 Section... OPERATIONS Administrative Requirements § 655.73 Access to facilities and records. (a) Except as required by... payment for the production of those records. (c) An employer shall permit access to all facilities...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...
41 CFR 102-74.270 - Are vehicles required to display parking permits in parking facilities?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vehicles required to... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.270 Are vehicles required...
Le, Aurora B; Hoboy, Selin; Germain, Anne; Miller, Hal; Thompson, Richard; Herstein, Jocelyn J; Jelden, Katelyn C; Beam, Elizabeth L; Gibbs, Shawn G; Lowe, John J
2018-02-01
The recent Ebola outbreak led to the development of Ebola virus disease (EVD) best practices in clinical settings. However, after the care of EVD patients, proper medical waste management and disposal was identified as a crucial component to containing the virus. Category A waste-contaminated with EVD and other highly infectious pathogens-is strictly regulated by governmental agencies, and led to only several facilities willing to accept the waste. A pilot survey was administered to determine if U.S. medical waste facilities are prepared to handle or transport category A waste, and to determine waste workers' current extent of training to handle highly infectious waste. Sixty-eight percent of survey respondents indicated they had not determined if their facility would accept category A waste. Of those that had acquired a special permit, 67% had yet to modify their permit since the EVD outbreak. This pilot survey underscores gaps in the medical waste industry to handle and respond to category A waste. Furthermore, this study affirms reports a limited number of processing facilities are capable or willing to accept category A waste. Developing the proper management of infectious disease materials is essential to close the gaps identified so that states and governmental entities can act accordingly based on the regulations and guidance developed, and to ensure public safety. Copyright © 2018 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23) filed an application for a preliminary permit... new 2.6-mile- long, 23-kilovolt transmission line; and (5) appurtenant facilities. The proposed...
43 CFR 13.4 - Terms of permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...
75 FR 72719 - Approval and Promulgation of Implementation Plans; Idaho
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
..., provisions relating to Tier 1 operating permits, facility emissions cap, standards of performance of certain... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2008-0482; FRL-9231-1] Approval and... Requirements 7/1/2002 for Tier II Operating Permits. 401 Tier II Operating Permit...... 4/6/2005 Except 401.01...
NPDES Permit for General Services Administration (GSA) West Heating Plant
Under National Pollutant Discharge Elimination System permit number DC0000035, General Services Administration (GSA) West Heating Plant is authorized to discharge from a facility to receiving waters named Rock Creek.
California Tribal Gasoline Permits
EPA is proposing a draft general permit under the Clean Air Act Federal Indian Country Minor NSR program for gasoline dispensing facilities, such as gas stations, located in Indian country within the geographical boundaries of California.
NPDES Permit for Wulf Cattle Depot in South Dakota
Under NPDES permit SD-0034606, the Wulf Cattle Depot is authorized to discharge and must operate their facility in accordance with effluent limitations, monitoring requirements, and other provisions set forth herein.
Method to fabricate layered material compositions
Fleming, James G.; Lin, Shawn-Yu
2004-11-02
A new class of processes suited to the fabrication of layered material compositions is disclosed. Layered material compositions are typically three-dimensional structures which can be decomposed into a stack of structured layers. The best known examples are the photonic lattices. The present invention combines the characteristic features of photolithography and chemical-mechanical polishing to permit the direct and facile fabrication of, e.g., photonic lattices having photonic bandgaps in the 0.1-20.mu. spectral range.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MULKEY, C.H.
1999-07-06
This document describes the results of the data quality objective (DQO) process undertaken to define data needs for state and federal requirements associated with toxic, hazardous, and/or radiological air emissions under the jurisdiction of the River Protection Project (RPP). Hereafter, this document is referred to as the Air DQO. The primary drivers for characterization under this DQO are the regulatory requirements pursuant to Washington State regulations, that may require sampling and analysis. The federal regulations concerning air emissions are incorporated into the Washington State regulations. Data needs exist for nonradioactive and radioactive waste constituents and characteristics as identified through themore » DQO process described in this document. The purpose is to identify current data needs for complying with regulatory drivers for the measurement of air emissions from RPP facilities in support of air permitting. These drivers include best management practices; similar analyses may have more than one regulatory driver. This document should not be used for determining overall compliance with regulations because the regulations are in constant change, and this document may not reflect the latest regulatory requirements. Regulatory requirements are also expected to change as various permits are issued. Data needs require samples for both radionuclides and nonradionuclide analytes of air emissions from tanks and stored waste containers. The collection of data is to support environmental permitting and compliance, not for health and safety issues. This document does not address health or safety regulations or requirements (those of the Occupational Safety and Health Administration or the National Institute of Occupational Safety and Health) or continuous emission monitoring systems. This DQO is applicable to all equipment, facilities, and operations under the jurisdiction of RPP that emit or have the potential to emit regulated air pollutants.« less
40 CFR 270.300 - What container information must I keep at my facility?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... containers holding ignitable or reactive wastes) and 40 CFR 267.175(c) (location of incompatible wastes in...
Under National Pollutant Discharge Elimination System permit number DC0000337, the Washington Metropolitan Area Transit Authority (WMATA) is authorized to dischargefrom a facility to receiving waters named Oxon Run.
These reports show the backlog status nationwide, based on EPA databases and input from EPA regions and states. The reports show a snapshot in time, keep in mind that the status of facilities and the universe of permits change.
40 CFR 144.31 - Application for a permit; authorization by permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (PSD) program under the Clean Air Act. (2) Name, mailing address, and location of the facility for... under SDWA. (iii) NPDES program under CWA. (iv) Prevention of Significant Deterioration (PSD) program...
NPDES Permit for Marathon Oil Company – Circle Ridge in Wyoming
Under NPDES permit WY-0000949, the Marathon Oil Company – Circle Ridge is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Coal Draw.
NPDES Permit Walter Reed Army Medical Center
Under National Pollutant Discharge Elimination System permit number DC0000361, the Department of the Army is authorized to discharge from a facility located at Walter Reed Army Medical Center into receiving waters named Rock Creek.
NPDES Permit for Wesco Operating, Inc. – Maverick Springs in Wyoming
Under NPDES permit WY-0000469, Wesco Operating, Inc. - Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.
Case study, comparison of trial burn results from similar sulfuric acid regeneration plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Milaszewski, M.; Johns, T.; Dickerson, W.F.
The primary business of Rhodia Eco Services (Rhodia) is the regeneration of sulfuric acid. Sulfuric acid regeneration requires thermal decomposition of acid to sulfur dioxide, and remaking the acid through chemical reaction. The sulfuric acid regeneration furnace is the ideal place to process pumpable wastes for energy recovery and for thermal destruction. Rhodia is regulated by the Boiler and Industrial Furnace (BIF) regulations (40 CFR 266, Subpart H). The Hammond, Indiana plant is an interim status BIF facility and the Houston, Texas facility is renewing its RCRA incineration permit as a BIF facility. Both plants have conducted BIF Trial Burnsmore » with very similar results. The performance levels demonstrated were at levels better than RCRA/BIF standards for destruction and removal efficiency, metal, HCl/Cl, particulate, dioxin/furan, and organic emissions.« less
NASA Glenn Wind Tunnel Model Systems Criteria
NASA Technical Reports Server (NTRS)
Soeder, Ronald H.; Roeder, James W.; Stark, David E.; Linne, Alan A.
2004-01-01
This report describes criteria for the design, analysis, quality assurance, and documentation of models that are to be tested in the wind tunnel facilities at the NASA Glenn Research Center. This report presents two methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it defines project procedures to test models in the NASA Glenn aeropropulsion facilities. Both customer-furnished and in-house model systems are discussed. The functions of the facility personnel and customers are defined. The format for the pretest meetings, safety permit process, and model reviews are outlined. The format for the model systems report (a requirement for each model that is to be tested at NASA Glenn) is described, the engineers responsible for developing the model systems report are listed, and the timetable for its delivery to the project engineer is given.
7 CFR 1424.10 - Succession and control of facilities and production.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 10 2014-01-01 2014-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...
7 CFR 1424.10 - Succession and control of facilities and production.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 10 2012-01-01 2012-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...
7 CFR 1424.10 - Succession and control of facilities and production.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 10 2013-01-01 2013-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...
7 CFR 1424.10 - Succession and control of facilities and production.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 10 2011-01-01 2011-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...
7 CFR 1424.10 - Succession and control of facilities and production.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...
40 CFR 124.10 - Public notice of permit actions and public comment period.
Code of Federal Regulations, 2014 CFR
2014-07-01
... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... (CONTINUED) WATER PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.10 Public notice... Act for the same facility or activity (including EPA when the draft permit is prepared by the State...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-28
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9765-4] Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State Operating Permit for U.S. Steel-- Granite City Works, Granite... Protection Agency (IEPA) for the U.S. Steel--Granite City Works (USGW) facility, located in Granite City...
77 FR 53898 - Collection of Information Under Review by Office of Management and Budget
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... following collections of information: 1625-0016, Welding and Hot Work Permits; Posting of Warning Signs.... Title: Welding and Hot Work Permits; Posting of Warning Signs. OMB Control Number: 1625-0016. Type of... facilities and vessels are in compliance with safety standards. A permit must be issued prior to welding or...
49 CFR 1155.20 - Notice of intent to apply for a land-use-exemption permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Notice of intent to apply for a land-use-exemption permit. 1155.20 Section 1155.20 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.20 Notice of intent to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9747-5] Reissuance of the NPDES General Permits for Oil and... Sea and on the Outer Continental Shelf in the Chukchi Sea, AK AGENCY: Environmental Protection Agency... draft general permits were also published in the Anchorage Daily News, the Arctic Sounder, and Petroleum...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of the Beaufort... (NPDES) General Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of... authorizes twelve types of discharges from facilities engaged in oil and gas geotechnical surveys to evaluate...
76 FR 16538 - Solid Waste Rail Transfer Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... circumstances. Upon receiving a land-use-exemption permit issued by the Board, a solid waste rail transfer... new application for a land-use-exemption permit if the rail line associated with the solid waste rail... transportation of solid waste by rail. (2) The Board will not grant a land-use-exemption permit for a solid waste...
40 CFR 270.305 - What tank information must I keep at my facility?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... 267.198. (j) For tank systems in which ignitable, reactive, or incompatible wastes are to be stored or...
NPDES Permit for Transit Waste's Bondad Landfill in Colorado
Under National Pollutant Discharge Elimination System permit number CO-R050005, Transit Waste, LLC is authorized to discharge from the Bondad Landfill facility in La Plata County, Colorado, to an unnamed tributary of the Animas River.
NPDES Permit for NRG Energy (Formerly GenOn Potomac River Generating Station)
Under National Pollutant Discharge Elimination System permit number DC0022004, NRG Energy (Formerly GenOn Potomac River Generating Station) is authorized to discharge from a facility into receiving waters named Potomac River.
NPDES Permit for Potomac Electric Power Company (PEPCO) Benning Generating Station
Under National Pollutant Discharge Elimination System permit number DC0000094, the Potomac Electric Power Company (PEPCO) Benning Generating Station is authorized to discharge from from a facility to receiving waters named Anacostia River.
NPDES Permit for Arboles Sand & Stone's Lob Lolly Industrial Site in Colorado
Under NPDES permit CO-0048194, Arboles Sand & Stone, LLC is authorized to discharge from its wastewater treatment facility at the Lob Lolly Industrial Site in Archuleta County, Colorado, to the Piedra River.
NPDES Permit for Marathon Oil Company – Maverick Springs in Wyoming
Under NPDES permit WY-0000779, the Marathon Oil Company – Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.
NPDES Permit for Super Concrete Ready-Mix Corp. (Aggregate Industries)
Under National Pollutant Discharge Elimination System permit number DC0000175, Super Concrete Ready-Mix Corporation is authorized to discharge from a facility to receiving waters named unnamed tributary to Northwest Branch of the Anacostia River.
NPDES Draft Permit for Spirit Lake Water Treatment Facility in North Dakota
Under NPDES draft permit ND-0031101, Spirit Lake Water Resource Management is authorized to discharge to an unnamed intermittent tributary to Devils Lake which is tributary to Sheyenne River in North Dakota.
Nitrate Waste Treatment Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.; Martinez, Patrick Thomas; Garcia, Terrence Kerwin
2017-07-05
This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).
NPDES Permit for National World War II Memorial
Under National Pollutant Discharge Elimination System permit number DC0000345, the National World War II Memorial is authorized to discharge from a facility located at 17th St. and Independence Ave., S.W. Washington DC 20024.
NPDES Permit for Leadville National Fish Hatchery in Colorado
Under National Pollutant Discharge Elimination System permit number CO-0000582, the U.S. Department of the Interior, Fish and Wildlife Service is authorized to discharge from its Leadville National Fish Hatchery wastewater treatment facility in Colorado.
NPDES Permit for Marathon Oil Company – Chatterton Battery in Wyoming
Under NPDES permit WY-0000922, the Marathon Oil Company – Chatterton Battery is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.
NPDES Permit for Glendale Colony and Harvey Farms in Montana
Under NPDES permit MT-0031819, Glendale Colony, Inc., and Harvey Farms, Inc. are authorized to discharge and must operate their facilities in accordance with provisions set forth herein.Indian Country on the Blackfeet Reserva
A Remote Absorption Process for Disposal of Evaporate and Reverse Osmosis Concentrates
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brunsell, D.A.
2008-07-01
Many commercial nuclear plants and DOE facilities generate secondary waste streams consisting of evaporator bottoms and reverse osmosis (RO) concentrate. Since liquids are not permitted in disposal facilities, these waste streams must be converted to dry solids, either by evaporation to dried solids or by solidification to liquid-free solids. Evaporation of the liquid wastes reduces their volume, but requires costly energy and capital equipment. In some cases, concentration of the contaminants during drying can cause the waste to exceed Class A waste for nuclear utilities or exceed DOE transuranic limits. This means that disposal costs will be increased, or that,more » when the Barnwell, SC disposal site closes to waste outside of the Atlantic Compact in July 2008, the waste will be precluded from disposal for the foreseeable future). Solidification with cement agents requires less energy and equipment than drying, but results in a volume increase of 50-100%. The doubling or tripling of waste weight, along with the increased volume, sharply increases shipping and disposal costs. Confronted with these unattractive alternatives, Diversified Technologies Services (DTS), in conjunction with selected nuclear utilities and D and D operations at Rocky Flats, undertook an exploratory effort to convert this liquid wastewater to a solid without using cement. This would avoid the bulking effect of cement, and permit the waste to be disposed of the Energy Solutions facility in Utah as well as some DOE facilities. To address the need for an attractive alternative to drying and cement solidification, a test program was developed using a polymer absorbent media to convert the concentrate streams to a liquid-free waste form that meets the waste acceptance criteria of the pertinent burial sites. Two approaches for mixing the polymer with the liquid were tested: mechanical mixing and in-situ incorporation. As part of this test program, a process control program (PCP) was developed that is 100% scalable from a concentrate test sample as small as 50 grams to full-scale processing of 100 cubic foot containers or larger. In summary: The absorption process offers utilities a viable and less costly alternative to on-site drying or solidification of concentrates. The absorption process can be completed by site personnel or by a vendor as a turnkey service. The process is suitable for multiple types of waste, including RO and evaporator concentrates, sludges, and other difficult to process waters and wet solids. (author)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
... traditional turbine-generator facility. The pumped storage facility would consist of: (1) A new upper... storage facility would be 86,430 megawatt hours. The turbine-generator facility would consist of: (1) an... turbine-generator unit. The estimated annual generation of the turbine generator unit would be 17,286...
NPDES Draft Permit for City of New Town Water Treatment Plant in North Dakota
Under National Pollutant Discharge Elimination System draft permit number ND0031151, The City of New Town Water Treatment Plant is authorized to discharge from its wastewater treatment facility in Mountrail County, North Dakota.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... facilities permitted under a 1995 Presidential Permit issued to Chevron Pipeline Company (``Chevron... Paso, Texas to the U.S. boundary with Mexico. Through corporate transactions, Chevron assigned the...
NPDES Permit for Shoshone Utility Organization in Wyoming
Under NPDES permit WY-0044580, the Shoshone Utility Organization is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to an unnamed irrigation drainage ditch tributary to the South Fork of the Little Wind R.
NPDES Permit for Chemtrade Refinery Services in Wyoming
Under NPDES permit WY-0034207, Chemtrade Refinery Services, Inc. is authorized to discharge from its wastewater treatment facility located in Fremont County,Wyoming, to an unnamed drainage way that flows into the Little Wind River near St. Stephens, Wyo.
NPDES Permit for Crossfire-Bonds Gravel Pit in Colorado
Under National Pollutant Discharge Elimination System permit number CO-0035024, the Crossfire-Bonds Gravel Pit is authorized to discharge from its wastewater treatement facility in Plata County, Colorado, to Deer Canyon, a tributary of the Animas River.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
.... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...
Fisher Sand & Gravel New Mexico, Inc. General Air Quality Permit: Related Documents
Documents related to the Fisher Sand & Gravel – New Mexico, Inc., Grey Mesa Gravel Pit General Air Quality Permit for New or Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country.
1981-08-01
City were contacted concern- ing Building and Construction permits. No regulations apply since they do not have jurisdiction over RMA property. It may...Division. Mr. Dale advised that their agency’s regulations applied only to permanent pollution emitting sources. Mr. Plog thought that their "fugitive dust...processing, treat- ment, recovery, and disposal of hazardous waste. "Person" means an individual trust, firm, joint stock company , Federal Agency
Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
40 CFR 437.4 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (a) Permit compliance monitoring is required for each regulated parameter. (b) Any CWT facility that... subpart. (3) When a CWT facility treats any waste receipt that contains cyanide at a concentration higher than 136 mg/L, the CWT facility must monitor for cyanide after cyanide treatment and before dilution...
40 CFR 437.4 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (a) Permit compliance monitoring is required for each regulated parameter. (b) Any CWT facility that... subpart. (3) When a CWT facility treats any waste receipt that contains cyanide at a concentration higher than 136 mg/L, the CWT facility must monitor for cyanide after cyanide treatment and before dilution...
40 CFR 437.4 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (a) Permit compliance monitoring is required for each regulated parameter. (b) Any CWT facility that... subpart. (3) When a CWT facility treats any waste receipt that contains cyanide at a concentration higher than 136 mg/L, the CWT facility must monitor for cyanide after cyanide treatment and before dilution...
Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandoval, Leonard Frank
This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less
Mass tracking and material accounting in the integral fast reactor (IFR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orechwa, Y.; Adams, C.H.; White, A.M.
1991-01-01
This paper reports on the Integral Fast Reactor (IFR) which is a generic advanced liquid metal cooled reactor concept being developed at Argonne National Laboratory. There are a number of technical features of the IFR which contribute to its potential as a next-generation reactor. These are associated with large safety margins with regard to off-normal events involving the heat transport system, and the use of metallic fuel which makes possible the utilization of innovative fuel cycle processes. The latter feature permits fuel cycle closure with compact, low-cost reprocessing facilities, collocated with the reactor plant. These primary features are being demonstratedmore » in the facilities at ANL-West, utilizing Experimental Breeder Reactor II and the associated Fuel Cycle Facility (FCF) as an IFR prototype. The demonstration of this IFR prototype includes the design and implementation of the Mass-tracking System (MTG). In this system, data from the operations of the FCF, including weights and batch-process parameters, are collected and maintained by the MTG running on distributed workstations.« less
Future U.S. supply of Mo-99 production through fission based LEU/LEU technology.
Welsh, James; Bigles, Carmen I; Valderrabano, Alejandro
Coquí RadioPharmaceuticals Corp. (Coquí) has the goal of establishing a medical isotope production facility for securing a continuous domestic supply of the radioisotope molybdenum-99 for U.S. citizens. Coquí will use an LEU/LEU proven and implemented open pool, light-water, 10 MW, reactor design. The facility is being designed with twin reactors for reliability an on-site hot lab chemical processing and a waste conditioning area and a possible generator producing radio-chemistry lab. Coquí identified a 25 acre site adjacent to an existing industrial park in northern central Florida. This land was gifted and transferred to Coquí by the University of Florida Foundation. We are in the process of developing licensing documents related to the facility. The construction permit application for submission to the U.S. Nuclear Regulatory Commission is currently being prepared. Submission is scheduled for mid to late 2015. Community reaction to the proposed development has been positive. We expect to create 220 permanent jobs and we have an anticipated to be operational by 2020.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-05-01
In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... operation of solid waste facilities; permitting and monitoring of wells, septic systems, and decommissioning of home oil tanks; maintenance and monitoring of water resources and associated facilities...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...
10 CFR 770.2 - What real property does this part cover?
Code of Federal Regulations, 2014 CFR
2014-01-01
....2 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC... sale or lease at closed or downsized defense nuclear facilities, for the purpose of permitting economic development. (b) DOE may transfer, by lease only, improvements at defense nuclear facilities on land withdrawn...
10 CFR 770.2 - What real property does this part cover?
Code of Federal Regulations, 2013 CFR
2013-01-01
....2 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC... sale or lease at defense nuclear facilities, for the purpose of permitting economic development. (b) DOE may transfer, by lease only, improvements at defense nuclear facilities on land withdrawn from the...
NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado
Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.
NPDES Draft Permit for Standing Rock Rural Water System in South Dakota
Under NPDES draft permit SD-0030996, the Standing Rock Rural Water System is authorized to discharge from its wastewater treatment facility in Corson County, South Dakota, to an unnamed tributary to Oahe Reservoir on the Missouri River.
Proposed Reopening of NPDES Permit for NTUA Tuba City WWTF
EPA is issuing a notice of proposed action under the Clean Water Act to reopen a National Pollutant Discharge Elimination System (NPDES) permit NN0020290 issued to the Navajo Tribal Utility Authority (NTUA) Tuba City Wastewater Treatment Facility.
NPDES Permit for Crow Nation Water Treatment Plants in Montana
Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.
NPDES Permit for Devon Energy Production Company – Riverton Dome in Wyoming
Under NPDES permit WY-0000671, Devon Energy Production Company, L.P. – Riverton Dome is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to the Little Wind River via unnamed draw.
Northern Edge Navajo Casino, Fruitland, NM: NN0030343
NPDES Permit and Fact Sheet explaining EPA's action under the Clean Water Act to issue NPDES Permit No. NN0030343) to the Navajo Tribal Utility Authority Northern Edge Navajo Casino Wastewater Treatment Facility, 2752 Indian Service Road 36, Fruitland, NM.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... principle place of business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary... with regard to whether issuing a new Presidential Permit reflecting the corporate succession and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary of Plains All... whether issuing a new Presidential Permit reflecting the corporate succession and authorizing Plains LPG...
Translating research into licensed vaccines and validated and licensed diagnostic tests.
Hill, R E; Foley, P L; Clough, N E; Ludemann, L R; Murtle, D C
2013-01-01
The USDA Center for Veterinary Biologics (CVB) has the regulatory authority to issue licenses and permits that allow the marketing of pure, safe, potent, and effective veterinary biological products. Under the standard licensing or permitting process, a manufacturer develops, characterizes, and evaluates a product prior to licensure. The CVB evaluates the submitted information, inspects the manufacturing facilities and methods of production and testing, and confirms key product test results through independent testing. This complete and comprehensive evaluation may not be possible during the emergence of a new animal disease or in response to an introduction of a significant transboundary animal disease agent. Processes are in place in the US that allow for more rapid availability of veterinary products in an emerging or emergency animal health situation. But, it can be advantageous to attain preapproval of products prior to their anticipated need. In this article, issues associated with obtaining approval for use of a biological product under emerging or emergency conditions are discussed.
Large Payload Transportation and Test Considerations
NASA Technical Reports Server (NTRS)
Rucker, Michelle A.; Pope, James C.
2011-01-01
Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Camper, Larry W.; Michalak, Paul; Cohen, Stephen
Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly andmore » the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schulz, C.; Givens, C.; Bhatt, R.
2003-02-24
Idaho National Engineering and Environmental Laboratory (INEEL) is conducting an effort to characterize approximately 620 drums of remote-handled (RH-) transuranic (TRU) waste currently in its inventory that were generated at the Argonne National Laboratory-East (ANL-E) Alpha Gamma Hot Cell Facility (AGHCF) between 1971 and 1995. The waste was generated at the AGHCF during the destructive examination of irradiated and unirradiated fuel pins, targets, and other materials from reactor programs at ANL-West (ANL-W) and other Department of Energy (DOE) reactors. In support of this effort, Shaw Environmental and Infrastructure (formerly IT Corporation) developed an acceptable knowledge (AK) collection and management programmore » based on existing contact-handled (CH)-TRU waste program requirements and proposed RH-TRU waste program requirements in effect in July 2001. Consistent with Attachments B-B6 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) and th e proposed Class 3 permit modification (Attachment R [RH-WAP] of this permit), the draft AK Summary Report prepared under the AK procedure describes the waste generating process and includes determinations in the following areas based on AK: physical form (currently identified at the Waste Matrix Code level); waste stream delineation; applicability of hazardous waste numbers for hazardous waste constituents; and prohibited items. In addition, the procedure requires and the draft summary report contains information supporting determinations in the areas of defense relationship and radiological characterization.« less
Inspection of KCBX Terminals Company, Chicago, Illinois – May 10, 2012
EPA inspected the petroleum coke (petcoke) facility to investigate a coal dust complaint, and evaluate for compliance with the facility's Federally Enforceable State Operating Permit (FESOP) and the Clean Air Act.
40 CFR 256.63 - Requirements for public participation in the permitting of facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE... solid waste disposal facility the State shall hold a public hearing to solicit public reaction and...
NPDES Permit for Thunder Butte Petroleum Services Inc. Refinery in North Dakota
Under NPDES permit ND-003098, the Thunder Butte Petroleum Services Inc. refinery is authorized to discharge from its wastewater treatment facilities near Makoti in Ward County, North Dakota, to wetlands tributary to the East Fork of Shell Creek.
NPDES Permit for Phoenix Production Company – Rolff Lake Unit in Wyoming
Under NPDES permit WY-002494, Phoenix Production Company is authorized to discharge from its Rolff Lake Unit wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.
NPDES Permit for Eastern Colorado Health Care System (VA Hospital) in Colorado
Under NPDES permit CO-0034991, the U.S. Department of Veterans Affairs (VA) is authorized to discharge from its wastewater treatment facility in Adams County, Colorado, to a storm sewer to Toll Gate Creek, a tributary of Sand Creek.
Shingle Springs Rancheria/Shingle Springs Band of Miwok Indians/Express Fuel Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Gasoline Dispensing Facilities in Indian Country within California.
NPDES Permit for Phoenix Production Company – Sheldon Dome Field in Wyoming
Under NPDES permit WY-0024953, Phoenix Production Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.
How to select a continuous emission monitoring system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Radigan, M.J.
1994-02-01
Selecting a continuous emission monitoring system (CEMS) involves more than picking an analyzer. Successful CEMS interface sampling and data-management systems to produce accurate, reliable reports required by regulatory agencies. Following objective guidelines removes some of the misery from CEMS shopping. However, prospective CEMS buyers should do their homework and develop well-thought-out, detailed specification for the processes' sampling criteria. Fine tuning the analyzer/data management system can eliminate maintenance costs and keep the facility operating within its permit restrictions.
Is a Solvent Reclamation Facility Considered a Chemical Process Plant
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
1981-01-01
as follows: a. Water quality degradation resulting from toxic waste inf iltration. b. Hazards involved using borrow pits for fly ash disposal. c...Charles George, Chairman Village of Pigeon 21043 LaSalle Pigeon , MI 48775 Warren, MI 48089 Honorable Bob Traxler Mr. Robert Armbruster, Supervisor...House of Representatives Winsor Township Washington, D.C. 20515 204 Berne St. Pigeon , MI 48755 Coast Guard Marine Inspection Of. Mr. Herman Rathke
Expediting the Process of a PSD for a Power-Generating Facility
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less
Instrumentation complex for Langley Research Center's National Transonic Facility
NASA Technical Reports Server (NTRS)
Russell, C. H.; Bryant, C. S.
1977-01-01
The instrumentation discussed in the present paper was developed to ensure reliable operation for a 2.5-meter cryogenic high-Reynolds-number fan-driven transonic wind tunnel. It will incorporate four CPU's and associated analog and digital input/output equipment, necessary for acquiring research data, controlling the tunnel parameters, and monitoring the process conditions. Connected in a multipoint distributed network, the CPU's will support data base management and processing; research measurement data acquisition and display; process monitoring; and communication control. The design will allow essential processes to continue, in the case of major hardware failures, by switching input/output equipment to alternate CPU's and by eliminating nonessential functions. It will also permit software modularization by CPU activity and thereby reduce complexity and development time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Michael George
This report describes conditions and information, as required by the state of Idaho, Department of Environmental Quality Reuse Permit I-161-02, for the Advanced Test Reactor Complex Cold Waste Ponds located at Idaho National Laboratory from November 1, 2015–October 31, 2016. The effective date of Reuse Permit I-161-02 is November 20, 2014 with an expiration date of November 19, 2019. This report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Permit required groundwater monitoring data • Status of compliance activities • Issues • Discussion of the facility’s environmental impacts. Duringmore » the 2016 permit year, 180.99 million gallons of wastewater were discharged to the Cold Waste Ponds. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest in well USGS-065, which is the closest downgradient well to the Cold Waste Ponds. Sulfate and total dissolved solids concentrations decrease rapidly as the distance downgradient from the Cold Waste Ponds increases. Although concentrations of sulfate and total dissolved solids are significantly higher in well USGS-065 than in the other monitoring wells, both parameters remained below the Ground Water Quality Rule Secondary Constituent Standards in well USGS-065. The facility was in compliance with the Reuse Permit during the 2016 permit year.« less
7 CFR 4288.25 - Succession and control of facilities and production.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...
7 CFR 4288.25 - Succession and control of facilities and production.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...
7 CFR 4288.25 - Succession and control of facilities and production.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...
21 CFR 900.16 - Appeals of denials of certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accreditation body. Appeals for facilities that have failed to become accredited are governed by the procedures... facility will not permit inspections or provide access to records or information in a timely fashion; or (3... accreditation body, FDA shall provide the facility with a statement of the grounds on which the denial is based...
21 CFR 900.16 - Appeals of denials of certification.
Code of Federal Regulations, 2011 CFR
2011-04-01
... accreditation body. Appeals for facilities that have failed to become accredited are governed by the procedures... facility will not permit inspections or provide access to records or information in a timely fashion; or (3... accreditation body, FDA shall provide the facility with a statement of the grounds on which the denial is based...
University of Maryland MRSEC - Facilities: SEM/STM/AFM
MRSEC Templates Opportunities Search Home » Facilities » SEM/STM/AFM Shared Experimental Facilities conducting and non conducting samples. The sample stage permits electronic device imaging under operational Specifications: Image Modes - STM, STS, MFM, EFM, SKPM, contact- and non-contact AFM Three Sample Contacts 0.1 nm
40 CFR 270.42 - Permit modification at the request of the permittee.
Code of Federal Regulations, 2014 CFR
2014-07-01
... storage in tanks or containers, or in containment buildings in accordance with 40 CFR part 268; (C) To...) Performance Track member facilities. The following procedures apply to Performance Track member facilities... Track member facilities must have complied with the requirements of § 264.15(b)(5) in order to request a...
40 CFR 270.42 - Permit modification at the request of the permittee.
Code of Federal Regulations, 2011 CFR
2011-07-01
... storage in tanks or containers, or in containment buildings in accordance with 40 CFR part 268; (C) To...) Performance Track member facilities. The following procedures apply to Performance Track member facilities... Track member facilities must have complied with the requirements of § 264.15(b)(5) in order to request a...
40 CFR 270.42 - Permit modification at the request of the permittee.
Code of Federal Regulations, 2013 CFR
2013-07-01
... storage in tanks or containers, or in containment buildings in accordance with 40 CFR part 268; (C) To...) Performance Track member facilities. The following procedures apply to Performance Track member facilities... Track member facilities must have complied with the requirements of § 264.15(b)(5) in order to request a...
40 CFR 270.42 - Permit modification at the request of the permittee.
Code of Federal Regulations, 2012 CFR
2012-07-01
... storage in tanks or containers, or in containment buildings in accordance with 40 CFR part 268; (C) To...) Performance Track member facilities. The following procedures apply to Performance Track member facilities... Track member facilities must have complied with the requirements of § 264.15(b)(5) in order to request a...
38 CFR 21.344 - Facility offering training or rehabilitation services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...
38 CFR 21.344 - Facility offering training or rehabilitation services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...
38 CFR 21.344 - Facility offering training or rehabilitation services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...
38 CFR 21.344 - Facility offering training or rehabilitation services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...
38 CFR 21.344 - Facility offering training or rehabilitation services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...
78 FR 53493 - Presidential Permits: NOVA Chemicals Inc. Line 20 Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... natural gas liquids from the United States to Ontario, Canada. The Line 20 facilities were constructed in 1986 and operated most recently by another entity for the transport of natural gas pursuant to a..., for the export of natural gas liquids from the United States to Canada. The term ``facilities'' as...
POST-OPERATIONAL TREATMENT OF RESIDUAL NA COOLLANT IN EBR-2 USING CARBONATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sherman, S.; Knight, C.
2011-03-08
At the end of 2002, the Experimental Breeder Reactor Two (EBR-II) facility became a U.S. Resource Conservation and Recovery Act (RCRA) permitted site, and the RCRA permit1 compelled further treatment of the residual sodium in order to convert it into a less reactive chemical form and remove the by-products from the facility, so that a state of RCRA 'closure' for the facility may be achieved (42 U.S.C. 6901-6992k, 2002). In response to this regulatory driver, and in recognition of project budgetary and safety constraints, it was decided to treat the residual sodium in the EBR-II primary and secondary sodium systemsmore » using a process known as 'carbonation.' In early EBR-II post-operation documentation, this process is also called 'passivation.' In the carbonation process (Sherman and Henslee, 2005), the system containing residual sodium is flushed with humidified carbon dioxide (CO{sub 2}). The water vapor in the flush gas reacts with residual sodium to form sodium hydroxide (NaOH), and the CO{sub 2} in the flush gas reacts with the newly formed NaOH to make sodium bicarbonate (NaHCO{sub 3}). Hydrogen gas (H{sub 2}) is produced as a by-product. The chemical reactions occur at the exposed surface of the residual sodium. The NaHCO{sub 3} layer that forms is porous, and humidified carbon dioxide can penetrate the NaHCO{sub 3} layer to continue reacting residual sodium underneath. The rate of reaction is controlled by the thickness of the NaHCO{sub 3} surface layer, the moisture input rate, and the residual sodium exposed surface area. At the end of carbonation, approximately 780 liters of residual sodium in the EBR-II primary tank ({approx}70% of original inventory), and just under 190 liters of residual sodium in the EBR-II secondary sodium system ({approx}50% of original inventory), were converted into NaHCO{sub 3}. No bare surfaces of residual sodium remained after treatment, and all remaining residual sodium deposits are covered by a layer of NaHCO{sub 3}. From a safety standpoint, the inventory of residual sodium in these systems was greatly reduced by using the carbonation process. From a regulatory standpoint, the process was not able to achieve deactivation of all residual sodium, and other more aggressive measures will be needed if the remaining residual sodium must also be deactivated to meet the requirements of the existing environmental permit. This chapter provides a project history and technical summary of the carbonation of EBR-II residual sodium. Options for future treatment are also discussed.« less
Under NPDES draft permit number CO-0035033, the U.S. General Services Administration is authorized to discharge from its Downing Reservoir Groundwater Treatment Plant to McIntyre Gulch entering Lakewood Gulch, tributary to the South Platte River.
NPDES Permit for Fort Carson Landfill No. 5 in Colorado
Under NPDES permit CO-0034771, the United States Army, HQ, Fort Carson, is authorized to discharge groundwater seepage from the Landfill No. 5 facility at the Fort Carson Army Post in El Paso County, Colorado, to B Ditch, a tributary of Fountain Creek.
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false License required; limited work authorization. 50.10... FACILITIES Requirement of License, Exceptions § 50.10 License required; limited work authorization. (a... permit, early site permit authorizing limited work authorization activities, combined license, or limited...
NPDES Permit for Wesco Operating, Inc. – Sheldon Dome Field in Wyoming
Under NPDES permit WY-0025607, Wesco Operating, Inc. is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Dry (Pasup) Creek, which is tributary to the Wind River.
NPDES Permit for Wesco Operating, Inc. – Winkleman Dome Field in Wyoming
Under NPDES permit WY-0025232, Wesco Operating, Inc. is authorized to discharge from its Winkleman Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Big Horn Draw, a tributary to the Little Wind River.
10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... exempt from the requirements of this section. [48 FR 33820, July 25, 1983] Report of Major Electric...
18 CFR 1304.205 - Other water-use facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... concrete boat launching ramp with associated driveway may be located within the access corridor... concrete is allowable; asphalt is not permitted. (b) Tables or benches for cleaning fish are permitted on... adjacent structures during winter drawdown. (h) Closed loop heat exchanges for residential heat pump...
18 CFR 1304.205 - Other water-use facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... concrete boat launching ramp with associated driveway may be located within the access corridor... concrete is allowable; asphalt is not permitted. (b) Tables or benches for cleaning fish are permitted on... adjacent structures during winter drawdown. (h) Closed loop heat exchanges for residential heat pump...
18 CFR 1304.205 - Other water-use facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... concrete boat launching ramp with associated driveway may be located within the access corridor... concrete is allowable; asphalt is not permitted. (b) Tables or benches for cleaning fish are permitted on... adjacent structures during winter drawdown. (h) Closed loop heat exchanges for residential heat pump...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Frederick
2012-02-01
This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA-000160-01), for the wastewater reuse site at the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from November 1, 2010 through October 31, 2011. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates; (3) Groundwater monitoring data; (4) Status of special compliance conditions; and (5) Discussion of the facility's environmental impacts. During the 2011 reporting year, an estimated 6.99 million gallons of wastewater were discharged to themore » Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. Using the dissolved iron data, the concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, R.S.; Diamante, J.M.; Duffey, R.B.
1996-07-01
The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
34 CFR 395.34 - Application for permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL...
NPDES Permit for Eagle Oil and Gas Company – Sheldon Dome Field in Wyoming
Under NPDES permit WY-0020338, the Eagle Oil and Gas Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, a tributary to the Wind River.
10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 1. 205.328 Section 205.328 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...
10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 2. 205.329 Section 205.329 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...
10 CFR 205.325 - Annual report.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at... maintain electric transmission facilities at international boundaries shall submit to the ERA, by February...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Price, S.M.
1997-04-30
This chapter provides information on the physical, chemical, and biological characteristics of the waste stored at the 616 NRDWSF. A waste analysis plan is included that describes the methodology used for determining waste types.
Ships Docked at Title V Permitted Facilities
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shafer, A.L.; Purdy, S.; Tempelis, D.
The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... acre-feet and normal water surface elevation of 5500 feet mean sea level; (2) an earthen dam... facility to release water into the stream below the dam; and (4) intake facilities for the power tunnel with facilities to store additional water to provide black start capability. Lower Reservoir (1) Will...
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL... Concentrated Aquatic Animal Production Facility (§ 122.24) A hatchery, fish farm, or other facility is a... aquatic animals in either of the following categories: (a) Cold water fish species or other cold water...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL... Concentrated Aquatic Animal Production Facility (§ 122.24) A hatchery, fish farm, or other facility is a... aquatic animals in either of the following categories: (a) Cold water fish species or other cold water...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of..., respectively, must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a valid state wholesaler's license in the state(s) where the dealer...
WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS
The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...
78 FR 73582 - Presidential Permit for Kinder Morgan Cochin, LLC
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
... conditions: Article 1. (1) The United States facilities herein described, and all aspects of their operation... Presidential Permit (the ``Application''). Article 2. The standards for, and the manner of, the operation and... their official duties. Article 3. The permittee shall comply with all applicable federal, state, and...
40 CFR 144.36 - Duration of permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Class II and III wells shall be issued for a period up to the operating life of the facility. The... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Duration of permits. 144.36 Section 144.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
40 CFR 239.4 - Narrative description of state permit program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-hazardous waste disposal units that receive CESQG hazardous waste, January 1, 1998. (e) A discussion of... WASTES REQUIREMENTS FOR STATE PERMIT PROGRAM DETERMINATION OF ADEQUACY State Program Application § 239.4...; (d) The number of facilities within the state's jurisdiction that received waste on or after the...
34 CFR 395.34 - Application for permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...
34 CFR 395.35 - Terms of permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true Terms of permit. 395.35 Section 395.35 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...
78 FR 4162 - Endangered Species; Receipt of Applications for Permit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
...: Greenville Zoo, Greenville, SC; PRT-92474A The applicant requests a captive-bred wildlife registration under.... Applicant: Honolulu Zoo, Honolulu, HI; PRT-94141A The applicant requests a permit authorizing interstate and... captive-bred facility in Honolulu, Hawaii to Africam Zoo in Puebla, Mexico for the purpose of enhancement...
77 FR 4288 - Arbitration Panel Decision Under the Randolph-Sheppard Act
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... February 5, 2009, permit application to operate vending machines at the Southern Oregon Rehabilitation... Blind for a permit to operate the Clinic vending machines.'' Arbitration Panel Decision After reviewing... vending machines are part and parcel of that facility. The panel noted that the parties' differing...
10 CFR 205.320 - Who shall apply.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... entity who operates an electric power transmission or distribution facility crossing the border of the... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...
This page contains documents relevant to the synthetic minor NSR permi for the Thunder Butte Petroleum Services, Inc., Crude Storage and Loading Facility, located on the Fort Berthold Indian Reservation in Ward County, ND.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Placido, Andrew; Liu, Kunlei; Challman, Don
This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will producemore » research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in some detail in this report, along with lessons learned.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
NASA Astrophysics Data System (ADS)
Perkis, David F.
Three published articles are presented which focus on enhancing various aspects of the energy supply chain. While each paper adopts a different methodology, all three combine engineering data and/or techniques with economic analysis to improve efficiency or policy design within energy markets. The first paper combines a chemical engineering plant design model with an economic assessment of product enhancements within an ethanol production facility. While a new chemical process is shown to achieve greater ethanol yields, the animal feed by-products are denatured and decrease in value due to the degradation of a key nutritional amino acid. Overall, yield increases outweigh any costs, providing additional value to firms adopting this process. The second paper uses a mixed integer linear model to assess the optimal location of cellulosic ethanol production facilities within the state of Indiana. Desired locations with low costs are linked to regions with high yield corn growth, as these areas provide an abundance of corn stover, a by-product of corn and a cellulosic source of ethanol. The third paper implements experimental economic methods to assess the effectiveness of policies intended to control prices in emissions permit markets. When utilizing reserve permit auctions as an alternative to setting explicit maximum prices, prices are elevated beyond the theoretical predictions of the model within the conditions of the experiment. The most likely cause of higher prices is the negotiating power provided to sellers by grandfathering permits as evidenced by higher than expected welfare gains to sellers. Before presenting the articles, a discussion is introduced regarding the role of assumptions used by economists. For each article, a key assumption is highlighted and the consequences of making a different assumption are provided. Whether the consequences are large or small, the benefits of elucidating our models with assumptions based on real world behaviors are clearly demonstrated.
40 CFR 430.76 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2014 CFR
2014-07-01
... limitations are only applicable at facilities where chlorophenolic-containing biocides are used. Permittees not using chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides. Zinc limitations are only applicable at facilities where zinc...
40 CFR 430.76 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitations are only applicable at facilities where chlorophenolic-containing biocides are used. Permittees not using chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides. Zinc limitations are only applicable at facilities where zinc...
The effect of motorcycle travel on the safety and operations of HOV facilities in Virginia.
DOT National Transportation Integrated Search
1995-01-01
The Intermodal Surface Transportation Efficiency Act of 1991 mandated that motorcycles be permitted to travel on federally funded high-occupancy vehicle (HOV) facilities unless they created a safety hazard or adversely affected HOV operations. Althou...
Hazardous Waste Cleanup: IBM Corporation, Former in Owego, New York
The corrective action activities at the facility are conducted by IBM Corporation, therefore IBM is listed as the operator of the Part 373 Hazardous Waste Management (HWM) Permit for corrective action. Lockheed Martin Corporation owns the facility and is l
28 CFR 540.41 - Visiting facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Visiting facilities. 540.41 Section 540.41 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT CONTACT... visitors. (a) Institutions of minimum and low security levels may permit visits beyond the security...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-08
... natural gas liquids (NGLs), propylene, and ethylene between the United States and Canada. Lines 16, 18 and... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid...
Silicon microelectronic field-emissive devices for advanced display technology
NASA Astrophysics Data System (ADS)
Morse, J. D.
1993-03-01
Field-emission displays (FED's) offer the potential advantages of high luminous efficiency, low power consumption, and low cost compared to AMLCD or CRT technologies. An LLNL team has developed silicon-point field emitters for vacuum triode structures and has also used thin-film processing techniques to demonstrate planar edge-emitter configurations. LLNL is interested in contributing its experience in this and other FED-related technologies to collaborations for commercial FED development. At LLNL, FED development is supported by computational capabilities in charge transport and surface/interface modeling in order to develop smaller, low-work-function field emitters using a variety of materials and coatings. Thin-film processing, microfabrication, and diagnostic/test labs permit experimental exploration of emitter and resistor structures. High field standoff technology is an area of long-standing expertise that guides development of low-cost spacers for FEDS. Vacuum sealing facilities are available to complete the FED production engineering process. Drivers constitute a significant fraction of the cost of any flat-panel display. LLNL has an advanced packaging group that can provide chip-on-glass technologies and three-dimensional interconnect generation permitting driver placement on either the front or the back of the display substrate.
Facility Search Help | ECHO | US EPA
Search for compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Biosecurity and bird movement practices in upland game bird facilities in the United States.
Slota, Katharine E; Hill, Ashley E; Keefe, Thomas J; Bowen, Richard A; Pabilonia, Kristy L
2011-06-01
Since 1996, the emergence of Asian-origin highly pathogenic avian influenza subtype H5N1 has spurred great concern for the global poultry industry. In the United States, there is concern over the potential of a foreign avian disease incursion into the country. Noncommercial poultry operations, such as upland game bird facilities in the United States, may serve as a potential source of avian disease introduction to other bird populations including the commercial poultry industry, backyard flocks, or wildlife. In order to evaluate how to prevent disease transmission from these facilities to other populations, we examined biosecurity practices and bird movement within the upland game bird industry in the United States. Persons that held a current permit to keep, breed, or release upland game birds were surveyed for information on biosecurity practices, flock and release environments, and bird movement parameters. Biosecurity practices vary greatly among permit holders. Many facilities allow for interaction between wild birds and pen-reared birds, and there is regular long-distance movement of live adult birds among facilities. Results suggest that upland game bird facilities should be targeted for biosecurity education and disease surveillance efforts.
Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.
Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M
2018-03-06
We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.
The Advancement of Public Awareness, Concerning TRU Waste Characterization, Using a Virtual Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
West, T. B.; Burns, T. P.; Estill, W. G.
2002-02-28
Building public trust and confidence through openness is a goal of the DOE Carlsbad Field Office for the Waste Isolation Pilot Plant (WIPP). The objective of the virtual document described in this paper is to give the public an overview of the waste characterization steps, an understanding of how waste characterization instrumentation works, and the type and amount of data generated from a batch of drums. The document is intended to be published on a web page and/or distributed at public meetings on CDs. Users may gain as much information as they desire regarding the transuranic (TRU) waste characterization program,more » starting at the highest level requirements (drivers) and progressing to more and more detail regarding how the requirements are met. Included are links to: drivers (which include laws, permits and DOE Orders); various characterization steps required for transportation and disposal under WIPP's Hazardous Waste Facility Permit; physical/chemical basis for each characterization method; types of data produced; and quality assurance process that accompanies each measurement. Examples of each type of characterization method in use across the DOE complex are included. The original skeleton of the document was constructed in a PowerPoint presentation and included descriptions of each section of the waste characterization program. This original document had a brief overview of Acceptable Knowledge, Non-Destructive Examination, Non-Destructive Assay, Small Quantity sites, and the National Certification Team. A student intern was assigned the project of converting the document to a virtual format and to discuss each subject in depth. The resulting product is a fully functional virtual document that works in a web browser and functions like a web page. All documents that were referenced, linked to, or associated, are included on the virtual document's CD. WIPP has been engaged in a variety of Hazardous Waste Facility Permit modification activities. During the public meetings, discussion centered on proposed changes to the characterization program. The philosophy behind the virtual document is to show the characterization process as a whole, rather than as isolated parts. In addition to public meetings, other uses for the information might be as a training tool for new employees at the WIPP facility to show them where their activities fit into the overall scheme, as well as an employee review to help prepare for waste certification audits.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-05-01
This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specifiedmore » in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.« less
NASA Astrophysics Data System (ADS)
Lançon, F.
2011-06-01
The Anti-ship Missile (ASM) threat to be faced by ships will become more diverse and difficult. Intelligence, rules of engagement constraints, fast reaction-time for effective softkill solution require specific tools to design Electronic Warfare (EW) systems and to integrate it onboard ship. SAGEM Company provides decoy launcher system [1] and its associated Naval Electronic Warfare Simulation tool (NEWS) to permit softkill effectiveness analysis for anti-ship missile defence. NEWS tool generates virtual environment for missile-ship engagement and counter-measure simulator over a wide spectrum: RF, IR, EO. It integrates EW Command & Control (EWC2) process which is implemented in decoy launcher system and performs Monte-Carlo batch processing to evaluate softkill effectiveness in different engagement situations. NEWS is designed to allow immediate EWC2 process integration from simulation to real decoy launcher system. By design, it allows the final operator to be able to program, test and integrate its own EWC2 module and EW library onboard, so intelligence of each user is protected and evolution of threat can be taken into account through EW library update. The objectives of NEWS tool are also to define a methodology for trial definition and trial data reduction. Growth potential would permit to design new concept for EWC2 programmability and real time effectiveness estimation in EW system. This tool can also be used for operator training purpose. This paper presents the architecture design, the softkill programmability facility concept and the flexibility for onboard integration on ship. The concept of this operationally focused simulation, which is to use only one tool for design, development, trial validation and operational use, will be demonstrated.
Technical Guidance for Title V Permitting of Printing Facilities
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Code of Federal Regulations, 2013 CFR
2013-07-01
... are met and the promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of... promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of Pharmacy Services, or...-related supplies must be forwarded to the VISN Pharmacist Executive or VISN Formulary Committee. All...
Code of Federal Regulations, 2014 CFR
2014-07-01
... are met and the promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of... promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of Pharmacy Services, or...-related supplies must be forwarded to the VISN Pharmacist Executive or VISN Formulary Committee. All...
Code of Federal Regulations, 2012 CFR
2012-07-01
... are met and the promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of... promotion is specifically permitted by the VISN Pharmacist Executive, or Chief of Pharmacy Services, or...-related supplies must be forwarded to the VISN Pharmacist Executive or VISN Formulary Committee. All...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... that regulated discharges will not cause unreasonable degradation of the marine environment, as... human health. EPA is also soliciting comments on whether or not to prohibit the discharge of produced... determining potential degradation of the marine environment in issuance of NPDES permits. These Ocean...
40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations; (B) Discharge the same types of wastes or engage in the same types of sludge use or disposal... AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE... or subcategories of discharges or sludge use or disposal practices or facilities described in the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Lease Suspensions, Cessation of Production, Royalty Rate Reductions, and Energy Policy Act Royalty Rate Conversions § 3212.22 What criteria establish a new... not: (1) Be permitted only with a Geothermal Drilling Permit; (2) Be constructed entirely within the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... incidental take permits for United's construction, operations, and maintenance of water management facilities... maintenance of the Freeman Diversion; diversion of water from the Santa Clara River; vegetation management... current and future water management activities. United intends to request a 50-year permit covering five...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
... sale of the facilities, which occurred on April 29, 2010. Since restructuring of the electric power... power system. Therefore, a requirement to provide non-discriminatory open access transmission service... determine that the proposed action will not adversely impact on the reliability of the U.S. electric power...
25 CFR 161.1 - What definitions do I need to know?
Code of Federal Regulations, 2013 CFR
2013-04-01
... number of animal units authorized in each grazing permit. Animal Unit (AU) means one adult cow and her 6...: Housing permits, farm leases, governmental facilities, rights-of-way, schools, parks, business leases, etc. Stocking rate means the maximum number of sheep units, or animal units authorized to graze on a particular...
Code of Federal Regulations, 2011 CFR
2011-07-01
... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...
Code of Federal Regulations, 2012 CFR
2012-07-01
... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...
Code of Federal Regulations, 2014 CFR
2014-07-01
... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-07-01
... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...
Code of Federal Regulations, 2013 CFR
2013-07-01
... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-07-01
... limitations, standards and prohibitions shall be established for each outfall or discharge point of the permitted facility, except as otherwise provided under § 122.44(k) (BMPs where limitations are infeasible) and paragraph (i) of this section (limitations on internal waste streams). (b) Production-based...
Bifunctional Catalysts for CO2 Reduction
2014-09-30
hexane soluble material was crystallized at –35 ºC permitting characterization by X-ray diffraction to identify [(tbsL) Co3 (µ 3- N)]NBu4 as the product...of the trinuclear core and make atom and group-transfer processes even more facile. To probe this we investigated the reactivity of (tbsL) Co3 (py...Reaction of (tbsL) Co3 (py) with with Bu4N[N3] yields the azide adduct Bu4N[( tbsL) Co3 (µ 3-N3)] which features a C3-symmetric, paramagnetically shifted
Wildlife conservation and solar energy development in the Desert Southwest, United States
Lovich, Jeffrey E.; Ennen, Josua R.
2011-01-01
Large areas of public land are currently being permitted or evaluated for utility-scale solar energy development (USSED) in the southwestern United States, including areas with high biodiversity and protected species. However, peer-reviewed studies of the effects of USSED on wildlife are lacking. The potential effects of the construction and the eventual decommissioning of solar energy facilities include the direct mortality of wildlife; environmental impacts of fugitive dust and dust suppressants; destruction and modification of habitat, including the impacts of roads; and off-site impacts related to construction material acquisition, processing, and transportation. The potential effects of the operation and maintenance of the facilities include habitat fragmentation and barriers to gene flow, increased noise, electromagnetic field generation, microclimate alteration, pollution, water consumption, and fire. Facility design effects, the efficacy of site-selection criteria, and the cumulative effects of USSED on regional wildlife populations are unknown. Currently available peer-reviewed data are insufficient to allow a rigorous assessment of the impact of USSED on wildlife.
18 CFR 157.15 - Requirements for applications covering acquisitions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requirements for... Requirements for applications covering acquisitions. An application for a certificate authorizing acquisition... all of vendor's facilities. (e) Any franchise, license, or permit respecting the facilities involved...
Computer Operating System Maintenance.
1982-06-01
FACILITY The Computer Management Information Facility ( CMIF ) system was developed by Rapp Systems to fulfill the need at the CRF to record and report on...computer center resource usage and utilization. The foundation of the CMIF system is a System 2000 data base (CRFMGMT) which stores and permits access
40 CFR 430.105 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... apply to non-continuous dischargers. Only facilities where chlorophenolic-containing biocides are used... chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides: Subpart J [NSPS for secondary fiber non-deink facilities where paperboard from wastepaper is...
40 CFR 270.1 - Purpose and scope of these regulations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements, such as application requirements, standard permit conditions, and monitoring and reporting... stores hazardous waste on-site in tanks, containers, or containment buildings; or (2) The facility... facility, and then stores or non-thermally treats the hazardous waste in containers, tanks, or containment...
34 CFR 395.35 - Terms of permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER... because of sex, race, age, creed, color, national origin, physical or mental disability, or political... property; and (3) Articles sold at vending facilities operated by blind licensees may consist of newspapers...
Glass-fiber-based neutron detectors for high- and low-flux environments
NASA Astrophysics Data System (ADS)
Bliss, Mary; Brodzinski, Ronald L.; Craig, Richard A.; Geelhood, Bruce D.; Knopf, Michael A.; Miley, Harry S.; Perkins, Richard W.; Reeder, Paul L.; Sunberg, Debra S.; Warner, Ray A.; Wogman, Ned A.
1995-09-01
Pacific Northwest Laboratory (PNL) has fabricated cerium-activated lithium silicate scintillating fibers via a hot-downdraw process. These fibers typically have a operational transmission length (e(superscript -1) length) of greater than 2 meters. This permits the fabrication of devices which were not possible to consider. Scintillating fibers permit conformable devices, large-area devices, and extremely small devices; in addition, as the thermal-neutron sensitive elements in a fast neutron detection system, scintillating fibers can be dispersed within moderator, improving neutron economy, over that possible with commercially available (superscript 3)He or BF(subscript 3) proportional counters. These fibers can be used for national-security applications, in medical applications, in the nuclear-power industry, and for personnel protection at experimental facilities. Data are presented for devices based on single fibers and devices made up of ribbons containing many fibers under high-and low-flux conditions.
Guidelines for Risk-Based Changeover of Biopharma Multi-Product Facilities.
Lynch, Rob; Barabani, David; Bellorado, Kathy; Canisius, Peter; Heathcote, Doug; Johnson, Alan; Wyman, Ned; Parry, Derek Willison
2018-01-01
In multi-product biopharma facilities, the protection from product contamination due to the manufacture of multiple products simultaneously is paramount to assure product quality. To that end, the use of traditional changeover methods (elastomer change-out, full sampling, etc.) have been widely used within the industry and have been accepted by regulatory agencies. However, with the endorsement of Quality Risk Management (1), the use of risk-based approaches may be applied to assess and continuously improve established changeover processes. All processes, including changeover, can be improved with investment (money/resources), parallel activities, equipment design improvements, and standardization. However, processes can also be improved by eliminating waste. For product changeover, waste is any activity not needed for the new process or that does not provide added assurance of the quality of the subsequent product. The application of a risk-based approach to changeover aligns with the principles of Quality Risk Management. Through the use of risk assessments, the appropriate changeover controls can be identified and controlled to assure product quality is maintained. Likewise, the use of risk assessments and risk-based approaches may be used to improve operational efficiency, reduce waste, and permit concurrent manufacturing of products. © PDA, Inc. 2018.
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
Facility Search Results | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Facility Search - Water | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Facility Search - Air | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Facility Search - Drinking Water | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Detailed Facility Report | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Facility Search - All Data | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
Code of Federal Regulations, 2011 CFR
2011-07-01
... recreational facilities in reservoir areas under the control of the Department of the Army and to permit the construction, maintenance, and operation of such facilities. The Secretary of the Army is authorized to grant leases of lands, including structures or facilities thereon, in reservoir areas for such periods and upon...
Facility Search - Hazardous Waste | ECHO | US EPA
ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
36 CFR 28.10 - Permitted and prohibited uses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... natural resources of the Seashore, on any lands, whether publicly or privately-held, which lie below mean... a building, bulkhead, pile, septic system, revetment, deck, swimming pool, or other structure or man... education, and natural resource protection uses and facilities consistent with the uses and facilities...
40 CFR 430.77 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... applicable at facilities where chlorophenolic-containing biocides are used. Permittees not using chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides. Zinc limitations are only applicable at facilities where zinc hydrosulfite is used as a bleaching...
40 CFR 430.77 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2013 CFR
2013-07-01
... applicable at facilities where chlorophenolic-containing biocides are used. Permittees not using chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides. Zinc limitations are only applicable at facilities where zinc hydrosulfite is used as a bleaching...
36 CFR 13.184 - Permit application.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 13.184 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Cabins Use of Temporary Facilities Related to Taking Fish and Wildlife... diagram, sketch or photograph of the temporary facility; (c) A map that shows the geographic location of...
40 CFR 430.95 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... apply to non-continuous dischargers. Only facilities where chlorophenolic-containing biocides are used... chlorophenolic-containing biocides must certify to the permit-issuing authority that they are not using these biocides: Subpart I [Facilities where fine paper is produced] [NSPS] Pollutant or pollutant property Kg/kkg...
78 FR 15016 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
... permitted to use paid feeding assistants to supplement the services of certified nurse aides. If facilities choose this option, feeding assistants must complete a training program. Nursing home providers are... collection; Title of Information Collection: Paid Feeding Assistants in Long-Term Care Facilities and...
36 CFR 13.184 - Permit application.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Section 13.184 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Cabins Use of Temporary Facilities Related to Taking Fish and Wildlife... diagram, sketch or photograph of the temporary facility; (c) A map that shows the geographic location of...
36 CFR 13.184 - Permit application.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 13.184 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Cabins Use of Temporary Facilities Related to Taking Fish and Wildlife... diagram, sketch or photograph of the temporary facility; (c) A map that shows the geographic location of...
38 CFR 21.146 - Independent instructor course.
Code of Federal Regulations, 2013 CFR
2013-07-01
... reasonable commuting distance from the veteran's home; or (2) The veteran's condition or other circumstances do not permit the veteran to attend an otherwise suitable facility within commuting distance. See... at an otherwise suitable facility because of the effects of his or her disability; (2) Based on...
38 CFR 21.146 - Independent instructor course.
Code of Federal Regulations, 2012 CFR
2012-07-01
... reasonable commuting distance from the veteran's home; or (2) The veteran's condition or other circumstances do not permit the veteran to attend an otherwise suitable facility within commuting distance. See... at an otherwise suitable facility because of the effects of his or her disability; (2) Based on...
38 CFR 21.146 - Independent instructor course.
Code of Federal Regulations, 2014 CFR
2014-07-01
... reasonable commuting distance from the veteran's home; or (2) The veteran's condition or other circumstances do not permit the veteran to attend an otherwise suitable facility within commuting distance. See... at an otherwise suitable facility because of the effects of his or her disability; (2) Based on...
38 CFR 21.146 - Independent instructor course.
Code of Federal Regulations, 2010 CFR
2010-07-01
... reasonable commuting distance from the veteran's home; or (2) The veteran's condition or other circumstances do not permit the veteran to attend an otherwise suitable facility within commuting distance. See... at an otherwise suitable facility because of the effects of his or her disability; (2) Based on...
38 CFR 21.146 - Independent instructor course.
Code of Federal Regulations, 2011 CFR
2011-07-01
... reasonable commuting distance from the veteran's home; or (2) The veteran's condition or other circumstances do not permit the veteran to attend an otherwise suitable facility within commuting distance. See... at an otherwise suitable facility because of the effects of his or her disability; (2) Based on...
10 CFR 60.133 - Additional design criteria for the underground facility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... specific site conditions identified through in situ monitoring, testing, or excavation. (c) Retrieval of waste. The underground facility shall be designed to permit retrieval of waste in accordance with the... RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Technical Criteria Design Criteria for the Geologic Repository...
10 CFR 60.133 - Additional design criteria for the underground facility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... specific site conditions identified through in situ monitoring, testing, or excavation. (c) Retrieval of waste. The underground facility shall be designed to permit retrieval of waste in accordance with the... RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Technical Criteria Design Criteria for the Geologic Repository...
10 CFR 60.133 - Additional design criteria for the underground facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... specific site conditions identified through in situ monitoring, testing, or excavation. (c) Retrieval of waste. The underground facility shall be designed to permit retrieval of waste in accordance with the... RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Technical Criteria Design Criteria for the Geologic Repository...
10 CFR 60.133 - Additional design criteria for the underground facility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... specific site conditions identified through in situ monitoring, testing, or excavation. (c) Retrieval of waste. The underground facility shall be designed to permit retrieval of waste in accordance with the... RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Technical Criteria Design Criteria for the Geologic Repository...
9 CFR 424.22 - Certain other permitted uses.
Code of Federal Regulations, 2014 CFR
2014-01-01
... based on the actual or estimated skin-free green weight of the bacon belly. (c) Irradiation of meat food... documentation on premises, available to FSIS: (i) Documentation that the irradiation facility is licensed or... radiation source irradiation facility is registered with the appropriate State government, if applicable...
9 CFR 424.22 - Certain other permitted uses.
Code of Federal Regulations, 2012 CFR
2012-01-01
... based on the actual or estimated skin-free green weight of the bacon belly. (c) Irradiation of meat food... documentation on premises, available to FSIS: (i) Documentation that the irradiation facility is licensed or... radiation source irradiation facility is registered with the appropriate State government, if applicable...
9 CFR 424.22 - Certain other permitted uses.
Code of Federal Regulations, 2013 CFR
2013-01-01
... based on the actual or estimated skin-free green weight of the bacon belly. (c) Irradiation of meat food... documentation on premises, available to FSIS: (i) Documentation that the irradiation facility is licensed or... radiation source irradiation facility is registered with the appropriate State government, if applicable...
9 CFR 424.22 - Certain other permitted uses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... based on the actual or estimated skin-free green weight of the bacon belly. (c) Irradiation of meat food... documentation on premises, available to FSIS: (i) Documentation that the irradiation facility is licensed or... radiation source irradiation facility is registered with the appropriate State government, if applicable...
9 CFR 424.22 - Certain other permitted uses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... based on the actual or estimated skin-free green weight of the bacon belly. (c) Irradiation of meat food... documentation on premises, available to FSIS: (i) Documentation that the irradiation facility is licensed or... radiation source irradiation facility is registered with the appropriate State government, if applicable...
50 CFR 22.26 - Permits for eagle take that is associated with, but not the purpose of, an activity.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including any of the following: (i) update fatality predictions for the facility; (ii) require implementation of additional conservation measures as described in the permit; (iii) update monitoring... or revoked, and have not been convicted of violating a Federal wildlife law in the last 10 years. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-17
... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...
40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...
40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...
40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
Code of Federal Regulations, 2014 CFR
2014-07-01
... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...
40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
Code of Federal Regulations, 2013 CFR
2013-07-01
... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...
40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
..., while providing for the operation and maintenance of the SDG&E electric powerline system. The project... communities, residents, businesses, and government owned facilities located within and adjacent to the... managed by the Bureau of Land Management (BLM); tribal lands of the La Jolla, Campo, Inaja, and Viejas...
Practical guide: Tools and methodologies for an oil and gas industry emission inventory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, C.C.; Killian, T.L.
1996-12-31
During the preparation of Title V Permit applications, the quantification and speciation of emission sources from oil and gas facilities were reevaluated to determine the {open_quotes}potential-to-emit.{close_quotes} The existing emissions were primarily based on EPA emission factors such as AP-42, for tanks, combustion sources, and fugitive emissions from component leaks. Emissions from insignificant activities and routine operations that are associated with maintenance, startups and shutdowns, and releases to control devices also required quantification. To reconcile EPA emission factors with test data, process knowledge, and manufacturer`s data, a careful review of other estimation options was performed. This paper represents the results ofmore » this analysis of emission sources at oil and gas facilities, including exploration and production, compressor stations and gas plants.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... Activities; Submission to OMB for Review and Approval; Comment Request; Facility Ground-Water Monitoring... docket, go to www.regulations.gov . Title: Facility Ground-Water Monitoring Requirements (Renewal). ICR.... Abstract: This ICR examines the ground-water monitoring standards for permitted and interim status...
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Development Areas for ski jumps, floats, boat moorage facilities, duck blinds, and other private floating recreation facilities when they will not create a safety hazard and inhibit public use or enjoyment of project waters or shoreline. A Corps permit is not required for temporary ice fishing shelters or duck...
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Development Areas for ski jumps, floats, boat moorage facilities, duck blinds, and other private floating recreation facilities when they will not create a safety hazard and inhibit public use or enjoyment of project waters or shoreline. A Corps permit is not required for temporary ice fishing shelters or duck...
Code of Federal Regulations, 2010 CFR
2010-07-01
... governmental instrumentality or agency, to the extent permitted by the Eleventh Amendment to the Constitution... section 120 of the Act, relating to Federal facilities); and against the President or any other officer of... officer, including an act or duty under section 120 of the Act (relating to Federal facilities), but not...
Code of Federal Regulations, 2011 CFR
2011-07-01
... governmental instrumentality or agency, to the extent permitted by the Eleventh Amendment to the Constitution... section 120 of the Act, relating to Federal facilities); and against the President or any other officer of... officer, including an act or duty under section 120 of the Act (relating to Federal facilities), but not...
Code of Federal Regulations, 2014 CFR
2014-07-01
... governmental instrumentality or agency, to the extent permitted by the Eleventh Amendment to the Constitution... section 120 of the Act, relating to Federal facilities); and against the President or any other officer of... officer, including an act or duty under section 120 of the Act (relating to Federal facilities), but not...
32 CFR 643.123 - Reserve facilities-Local civic organizations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Reserve facilities-Local civic organizations. 643... (CONTINUED) REAL PROPERTY REAL ESTATE Additional Authority of Commanders § 643.123 Reserve facilities—Local... been constructed, local civic and similar nonprofit organizations may be permitted to use the armory...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are cafeterias...