Sample records for facility permitting process

  1. A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, G.J.; Rose, W.M.; Domenici, P.V.

    This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects ofmore » the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)« less

  2. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl; Buttner, William; Burgess, Robert

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  3. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit applicationmore » guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than

  4. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  5. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  6. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  7. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  8. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  9. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units

  10. Hydroelectric Generating Facilities General Permit ...

    EPA Pesticide Factsheets

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  11. NPDES Permit for Riverview Estates Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number ND-0031143, the Riverview Estates Wastewater Treatment Facility is authorized to discharge from its wastewater treatment facility in designated locations as described in the permit.

  12. WIPP Hazardous Waste Facility Permit Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kehrman, B.; Most, W.

    2006-07-01

    The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification requestmore » that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of

  13. NPDES Permit: Shiprock Wastewater Treatment Facility, Shiprock, New Mexico

    EPA Pesticide Factsheets

    NPDES Permit, Fact Sheet, and Response to Comments explaining EPA's issue of NPDES Permit No. NN0020621 to the Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility, Shiprock, San Juan County, New Mexico.

  14. Hazardous Waste Permitting

    EPA Pesticide Factsheets

    To provide RCRA hazardous waste permitting regulatory information and resources permitted facilities, hazardous waste generators, and permit writers. To provide the public with information on how they can be involved in the permitting process.

  15. Hanford facility dangerous waste permit application, general information portion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion ismore » broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).« less

  16. Hanford facility dangerous waste permit application, PUREX storage tunnels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, C. R.

    1997-09-08

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).

  17. Potable Water Treatment Facility General Permit (PWTF GP) ...

    EPA Pesticide Factsheets

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  18. Hanford Facility Dangerous Waste Permit Application for T Plant Complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BARNES, B.M.

    2002-09-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the T Plant Complex (this document, DOE/RL-95-36). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agencymore » (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the T Plant Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the T Plant Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text.« less

  19. General Air Quality Permit Request for Coverage: US Silica - Parshall Transload Facility

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.

  20. Stone Quarrying, Crushing and Screening Facilities General Air Quality Permit Request for Coverage: US Silica - Parshall Transload Facility

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.

  1. NPDES Permit for Charlo Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0022551, the Consolidated Charlo-Lake County Water & Sewer District is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to an unnamed swale that runs to Dublin Gulch.

  2. 34 CFR 395.16 - Permit for the establishment of vending facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., the number, location and type of vending machines and other terms and conditions desired to be... 34 Education 2 2010-07-01 2010-07-01 false Permit for the establishment of vending facilities. 395...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM...

  3. NPDES Draft Permit for MHA Interpretive Center Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under draft NPDES permit ND0031160, the Mandan, Hidatsa, and Arikara (MHA) Nation Public Works is authorized to discharge from its MHA Interpretive Center wastewater treatment facility to Missouri River as set forth in the permit.

  4. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Mike

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistentmore » with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.« less

  5. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  6. NPDES Permit for Fort Carson Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit no. CO-0021181 the United States Department of the Army, Fort Carson, in authorized to discharge from its sanitary wastewater treatment facility in El Paso County, Colorado, to Clover Ditch, a tributary of Fountain Creek.

  7. NPDES Draft Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit ND0030813, the Dakota Magic Hotel and Casino WWTF is authorized to discharge, in accordance with the requirements as contained in the provisions of this Permit, from its wastewater treatment facility to the Bois de Sioux.

  8. NPDES Permit for Yellowtail Dam Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0022993, the U.S. Bureau of Reclamation is authorized to discharge from its wastewater treatment facility located at the Yellowtail Dam Field Office in Big Horn County, Montana, to the Yellowtail Afterbay Reservoir/Bighorn River.

  9. NPDES Permit for Yellowtail Visitor Center Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    NPDES permit MT-0029106 for United States Bureau of Reclamation discharge from its Yellowtail Visitor Center wastewater treatment facility into the Bighorn Lake/Bighorn River in Big Horn County, Montana.

  10. NPDES Permit for Soap Creek Associates Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT-0023183, Soap Creek Associates, Inc. is authorized to discharge from its wastewater treatment facility located in West, Bighorn County, Montana, to Soap Creek.

  11. NPDES Permit for Lame Deer Lagoon Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Final permit authorizes the Northern Cheyenne Utilities Commission to discharge from its Lame Deer Lagoon wastewater treatment facility located in Rosebud County, Montana to Lame Deer Creek, a tributary to Rosebud Creek.

  12. NPDES Permit for City of Polson Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT-0020559, the City of Polson is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to the Flathead River.

  13. NPDES Permit for Woodcock Home Addition Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0030554, the Salish and Kootenai Housing Authority is authorized to discharge from its Woodcock Home Addition Wastewater Treatment Facility in Lake County, Montana, to a swale draining to Middle Crow Creek.

  14. Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility; Draft NPDES Permit

    EPA Pesticide Factsheets

    EPA is proposing to issue a NPDES permit (No. NN0020621) to Navajo Tribal Utility Authority (NTUA) for the Shiprock wastewater treatment facility in San Juan County, New Mexico, within the northeastern portion of the Navajo Nation.

  15. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81more » Water Services waste water.« less

  16. Synthetic Minor NSR Permit: Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility

    EPA Pesticide Factsheets

    This page contains the response to public comments and final synthetic minor NSR permit for the Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility, operated by Chemtrade Logistics and located on the Wind River Indian Reservation in Fremont County

  17. 40 CFR 124.206 - In what situations may I require a facility owner or operator to apply for an individual permit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... history of significant non-compliance with regulations or permit conditions. (3) The facility has a demonstrated history of submitting incomplete or deficient permit application information. (4) The facility has... standardized RCRA permit. (2) Circumstances have changed since the time the facility owner or operator applied...

  18. NPDES Permit for Keller Transport, Inc. Groundwater Remediation Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT0030805, Keller Transport, Inc. is authorized to discharge from its groundwater remediation treatment facility in Lake County, Montana, to Flathead Lake.

  19. Potable Water Treatment Facility General Permit (PWTF GP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the draft NPDES General Permit for Discharges from Potable Water Treatment Facilities in Massachusetts (MAG640000) and New Hampshire (NHG640000).

  20. NPDES Permit for City of Wagner Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0020184, the City of Wagner, South Dakota is authorized to discharge from its wastewater treatment facility in Charles Mix County, South Dakota, to an unnamed tributary of Choteau Creek.

  1. NPDES Permit for Town of Hot Springs Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT0020591, the Town of Hot Springs, Montana, is authorized to discharge from its wastewater treatment facility located in Sanders County, Montana, to a ditch discharging to Hot Springs Creek.

  2. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  3. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  4. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  5. 40 CFR 74.14 - Opt-in permit process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Opt-in permit process. 74.14 Section 74.14 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.14 Opt-in permit process. (a) Submission. The...

  6. NPDES Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  7. NPDES Permit for Town of Lodge Grass Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT0021890, the Town of Lodge Grass is authorized to discharge from from its wastewater treatment facility in Big Horn County to an unnamed slough to the Little Bighorn River.

  8. NPDES Permit for the St. Ignatius-Southside Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0029017, the Salish and Kootenai Housing Authority of the Confederated Salish and Kootenai Tribes is authorized to discharge from its wastewater treatment facility in Lake County, Montana to an unnamed tributary of Sabine Creek.

  9. NPDES Permit for Rosebud Casino and Hotel Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  10. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  11. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  12. NPDES Draft Permit for Southern Ute Indian Tribe Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES draft permit number CO-0022853, the Southern Ute Indian Tribe is authorized to discharge from its wastewater treatment facility in La Plata County, Colorado,to Rock Creek, a tributary of the Los Pinos River.

  13. NPDES Permit for City of Eagle Butte Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0020192, the City of Eagle Butte, South Dakota, is authorized to discharge from its wastewater treatment facility within the Cheyenne River Sioux Reservation in Dewey County, South Dakota, to Green Grass Creek.

  14. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  15. 40 CFR 124.4 - Consolidation of permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... consolidate processing a PSD permit with any other permit under paragraph (a) or (b) of this section when to do so would delay issuance of the PSD permit more than one year from the effective date of the...

  16. 40 CFR 124.4 - Consolidation of permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consolidate processing a PSD permit with any other permit under paragraph (a) or (b) of this section when to do so would delay issuance of the PSD permit more than one year from the effective date of the...

  17. 40 CFR 124.4 - Consolidation of permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... consolidate processing a PSD permit with any other permit under paragraph (a) or (b) of this section when to do so would delay issuance of the PSD permit more than one year from the effective date of the...

  18. 40 CFR 124.4 - Consolidation of permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... consolidate processing a PSD permit with any other permit under paragraph (a) or (b) of this section when to do so would delay issuance of the PSD permit more than one year from the effective date of the...

  19. NPDES Permit for U.S. Air Force Academy Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0020974, the U.S. Air Force Academy is authorized to discharge from its wastewater treatment facility in El Paso County, Colorado, to Non-Potable Reservoir No. 1 on Lehman Run and to Monument Creek.

  20. 40 CFR 124.4 - Consolidation of permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... processing a PSD permit with any other permit under paragraph (a) or (b) of this section when to do so would delay issuance of the PSD permit more than one year from the effective date of the application under...

  1. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF)more » and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.« less

  2. 32 CFR 855.12 - Processing a permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Processing a permit application. 855.12 Section 855.12 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT CIVIL AIRCRAFT USE OF UNITED STATES AIR FORCE AIRFIELDS Civil Aircraft Landing Permits § 855.12 Processing a...

  3. 32 CFR 855.12 - Processing a permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Processing a permit application. 855.12 Section 855.12 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT CIVIL AIRCRAFT USE OF UNITED STATES AIR FORCE AIRFIELDS Civil Aircraft Landing Permits § 855.12 Processing a...

  4. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  5. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  6. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  7. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  8. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  9. 33 CFR Appendix A to Part 331 - Administrative Appeal Process for Permit Denials and Proffered Permits

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Administrative Appeal Process for... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. A Appendix A to Part 331—Administrative Appeal Process for Permit Denials and Proffered Permits ER28MR00.000 ...

  10. Stone Quarrying, Crushing and Screening Facilities General Air Quality Permit Request for Coverage: Unimin Corporation - Unimin Flat Storage

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing and Screening Facilities General Permit, for the Unimin Corporation Silica Sand Rail Transloading Facility on the Fort Berhold Indian Reservation, North Dakota.

  11. NPDES Permit for F.E. Warren Air Force Base Missile Launch Facilities in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034789, the USAF, F. E. Warren Air Force Base, is authorized to discharge from the Missile Launch Facilities located in northeastern Colorado to unnamed drainage ditches located in the Cedar Creek and Pawnee Creek drainage basins.

  12. NPDES Permit for Dakota Magic Casino and Hotel Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND0030813, the the Dakota Magic Casino and Hotel is authorized is authorized to discharge from its wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  13. 18 CFR 157.21 - Pre-filing procedures and review process for LNG terminal facilities and other natural gas...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and review process for LNG terminal facilities and other natural gas facilities prior to filing of... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY AND FOR ORDERS PERMITTING AND APPROVING ABANDONMENT UNDER SECTION 7 OF THE NATURAL...

  14. Synthetic Minor NSR Permit: Van Hook Crude Terminal, LLC - Van Hook Crude Terminal/Rail Loading Facility

    EPA Pesticide Factsheets

    This page contains the current effective synthetic minor NSR permit for the Van Hook Crude Terminal, LLC, Van Hook Crude Terminal/Rail Loading Facility, located on the Fort Berthold Indian Reservation in Mountrail County, ND.

  15. Report: Better Enforcement Oversight Needed for Major Facilities with Water Discharge Permits in Long-Term Significant Noncompliance

    EPA Pesticide Factsheets

    Report #2007-P-00023, May 14, 2007. EPA did not provide effective enforcement oversight of major facilities with National Pollutant Discharge Elimination System permits in long-term significant noncompliance.

  16. IT Solution to Improve the Permitting Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hammer, Mary

    2013-02-14

    Over the past decade Houston has taken significant strides to implement and promote sustainability. Currently the City of Houston’s Green Building Resource Center stands testament to the determination of city officials to make Houston truly green. Houston was named a Solar America City by the Department of Energy (DOE) in 2008 and is part of the Texas Solar Collaboration as part of the DOE Rooftop Challenge Grant. In that time, Houston has made significant progress in addressing the challenges associated with installing solar in the City. One of the challenges related to soft costs of solar are the time andmore » associated costs related to the permitting process. From 2000 to 2010, the Houston area has witnessed unprecedented growth, with the population increasing by nearly 700,000. The City of Houston is working to address the needs of this growing population, including building the new One-Stop Code and Permitting building. The Houston Permitting Center opened in June 2011. It combines the majority of the City of Houston's permitting and licensing into one place with a mission to help customers achieve their goals while complying with the City’s regulations. The stated mission “requires a continuous pursuit of improving the customer experience. Providing excellent service, streamlining business processes, implementing innovative technologies, and proactively engaging customers are all cornerstones of this philosophy.”« less

  17. Topical otic drugs in a multi-purpose manufacturing facility: a guide on determination and application of permitted daily exposure (PDE).

    PubMed

    Wiesner, Lisa; Prause, Maarten; Lovsin Barle, Ester

    2018-03-01

    Due to newly introduced EU GMP (Good Manufacturing Practice) guideline for Medicinal Products for Human and Veterinary use, product specific permitted daily exposure (PDE) for toxicological evaluation in multi-purpose facilities are required within a documented process for risk assessment. European Medicines Agency (EMA) guidance on setting PDE limits so far focused on systemic administration routes such as intravenous (IV), oral or inhalation. This article provides guidance on setting PDE values for risk management purposes in multi-purpose facilities for active pharmaceutical ingredients (APIs) applied as topical otic drugs to the outer ear canal. The therewith determined PDE otic, is used for the calculation of maximum safe carry-over (MSC) in manufacturing scenarios where a topical otic product is manufactured followed by another topical otic product.

  18. Spacelab Data Processing Facility

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The capabilities of the Spacelab Data Processing Facility (SPDPF) are highlighted. The capturing, quality monitoring, processing, accounting, and forwarding of vital Spacelab data to various user facilities around the world are described.

  19. Ships Docked at Title V Permitted Facilities

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  1. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  2. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  3. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  4. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  5. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  6. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  7. Evoqua RCRA Permit Application and Draft Permit Documents

    EPA Pesticide Factsheets

    Documents pertaining to the proposed RCRA permit for the Evoqua Water Technologies LLC carbon regeneration facility located on the Colorado River Indian Tribes (CRIT) reservation near Parker, Arizona.

  8. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  9. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  10. 40 CFR 74.14 - Opt-in permit process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... combustion or process source withdraws its application, in order to re-apply, it must submit a new opt-in...) [Reserved] (d) Entry into Acid Rain Program—(1) Effective date. The effective date of the opt-in permit...

  11. 50 CFR 622.270 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Dolphin and Wahoo Fishery Off the Atlantic States § 622.270 Permits. (a) Commercial vessel permits. (1) For a person aboard... the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must...

  12. Operating Permits Program Review Process

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. Defense Waste Processing Facility Process Enhancements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bricker, Jonathan

    2010-11-01

    Jonathan Bricker provides an overview of process enhancements currently being done at the Defense Waste Processing Facility (DWPF) at SRS. Some of these enhancements include: melter bubblers; reduction in water use, and alternate reductant.

  14. Soil Sample Report in Support of the Site 300 EWTF Ecological Risk Assessment and Permit Renewal-September 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terusaki, Stanley; Gallegos, Gretchen; MacQueen, Donald

    2012-10-02

    LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potentialmore » interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.« less

  15. RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

  16. 76 FR 45792 - Proposed Reissuance of a General NPDES Permit for Facilities Related to Oil and Gas Extraction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... General NPDES Permit for Facilities Related to Oil and Gas Extraction AGENCY: Environmental Protection... (GP) regulating activities related to the extraction of oil and gas on the North Slope of the Brooks... intended to regulate activities related to the extraction of oil and gas on the North Slope of the Brooks...

  17. 77 FR 58217 - Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Notice of Delays in Processing of Special Permits Applications AGENCY: Pipeline and Hazardous Materials Safety.... FOR FURTHER INFORMATION CONTACT: Ryan Paquet, Director, Office of Hazardous Materials Special Permits...

  18. 77 FR 64846 - Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Notice of Delays in Processing of Special Permits Applications AGENCY: Pipeline and Hazardous Materials Safety.... FOR FURTHER INFORMATION CONTACT: Ryan Paquet, Director, Office of Hazardous Materials Special Permits...

  19. Oversize/overweight vehicle unified permitting process (UPP) : phase I.

    DOT National Transportation Integrated Search

    2017-08-01

    Multiple jurisdictions within Minnesota process oversize/overweight (OSOW) permits for the movement of freight on state roadways, county roads, and municipal and township streets. Movement of freight has increased in recent years to help support econ...

  20. 40 CFR 52.279 - Food processing facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...

  1. 40 CFR 52.279 - Food processing facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...

  2. 40 CFR 52.279 - Food processing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...

  3. 40 CFR 52.279 - Food processing facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emissions from food processing facilities without any accompanying analyses demonstrating that these... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities...

  4. Spacelab Data Processing Facility

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Spacelab Data Processing Facility (SDPF) processes, monitors, and accounts for the payload data from Spacelab and other Shuttle missions and forwards relevant data to various user facilities worldwide. The SLDPF is divided into the Spacelab Input Processing System (SIPS) and the Spacelab Output Processing System (SOPS). The SIPS division demultiplexes, synchronizes, time tags, quality checks, accounts for the data, and formats the data onto tapes. The SOPS division further edits, blocks, formats, and records the data on tape for shipment to users. User experiments must conform to the Spacelab's onboard High Rate Multiplexer (HRM) format for maximum process ability. Audio, analog, instrumentation, high density, experiment data, input/output data, quality control and accounting, and experimental channel tapes along with a variety of spacelab ancillary tapes are provided to the user by SLDPF.

  5. Commonwealth of Pennsylvania. [Establishment of hazardous waste facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Environmental Resources Secretary Arthur A. Davis and Commerce Secretary Raymond R. Christman have announced a joint initiative to establish commercial hazardous waste treatment and disposal facilities Pennsylvania. The state Hazardous Sites Cleanup Act, which Gov. Robert P. Casey signed into law last October, called for accelerated efforts in this regard. These included an expedited permitting process for facilities, requiring the Department of Environmental Resources (DER) to appoint a special sitting team to review permit applications, and designation of sitting coordinator within the Department of Commerce to identify potential developers of the facilities and encourage them to operate within Pennsylvania.

  6. Technical Guidance for Title V Permitting of Printing Facilities

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  8. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  9. 47 CFR 73.1615 - Operation during modification of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...

  10. Safeguards Approaches for Black Box Processes or Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diaz-Marcano, Helly; Gitau, Ernest TN; Hockert, John

    2013-09-25

    The objective of this study is to determine whether a safeguards approach can be developed for “black box” processes or facilities. These are facilities where a State or operator may limit IAEA access to specific processes or portions of a facility; in other cases, the IAEA may be prohibited access to the entire facility. The determination of whether a black box process or facility is safeguardable is dependent upon the details of the process type, design, and layout; the specific limitations on inspector access; and the restrictions placed upon the design information that can be provided to the IAEA. Thismore » analysis identified the necessary conditions for safeguardability of black box processes and facilities.« less

  11. 40 CFR 147.2927 - Permit modification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are substantial changes to the facility or activity which occurred after permit issuance that justify... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Permit modification. 147.2927 Section 147.2927 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  12. Canyon Day Sand and Gravel Wash Process Plant: Draft NPDES Permit AZ0024511

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to issue NPDES Permit No.permit renewal (No. AZ0024511) to White Mountain Apache Tribe Canyon Day Sand and Gravel Wash Process Plant, Greer, Arizona.

  13. 50 CFR 622.240 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of... golden crab harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a...

  14. Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation: Coverage Under General Air Quality Permit for Stone Quarrying, Crushing and Screening Facilities

    EPA Pesticide Factsheets

    Documents related to approved request for coverage under the Stone Quarrying, Crushing and Screening Facilities General Permit for Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation located in McKinley and San Juan Counties, NM.

  15. 77 FR 59186 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... ENVIRONMENTAL PROTECTION AGENCY [Petition IV-2011-1; FRL-9734-2] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority's Shawnee Fossil... Valley Authority for its Shawnee Fossil Plant (SFP) facility located in West Paducah, Kentucky. This...

  16. Rosebud Casino and Hotel NPDES Proposed Permit

    EPA Pesticide Factsheets

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  17. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  18. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  19. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  20. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  1. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  2. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  3. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  4. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  5. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  6. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  7. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  8. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  9. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  10. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  11. Modular evaluation method for subsurface activities (MEMSA). A novel approach for integrating social acceptance in a permit decision-making process for subsurface activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Os, Herman W.A. van, E-mail: h.w.a.van.os@rug.nl; Herber, Rien, E-mail: rien.herber@rug.nl; Scholtens, Bert, E-mail: l.j.r.scholtens@rug.nl

    We investigate how the decision support system ‘Modular Evaluation Method Subsurface Activities’ (MEMSA) can help facilitate an informed decision-making process for permit applications of subsurface activities. To this end, we analyze the extent the MEMSA approach allows for a dialogue between stakeholders in a transparent manner. We use the exploration permit for the underground gas storage facility at the Pieterburen salt dome (Netherlands) as a case study. The results suggest that the MEMSA approach is flexible enough to adjust to changing conditions. Furthermore, MEMSA provides a novel way for identifying structural problems and possible solutions in permit decision-making processes formore » subsurface activities, on the basis of the sensitivity analysis of intermediate rankings. We suggest that the planned size of an activity should already be specified in the exploration phase, because this would allow for a more efficient use of the subsurface as a whole. We conclude that the host community should be involved to a greater extent and in an early phase of the permit decision-making process, for example, already during the initial analysis of the project area of a subsurface activity. We suggest that strategic national policy goals are to be re-evaluated on a regular basis, in the form of a strategic vision for the subsurface, to account for timing discrepancies between the realization of activities and policy deadlines, because this discrepancy can have a large impact on the necessity and therefore acceptance of a subsurface activity.« less

  12. 50 CFR 25.41 - Who issues refuge permits?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Who issues refuge permits? 25.41 Section... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Permits § 25.41 Who issues refuge permits? We authorize the refuge manager of the facility where an activity is to take place to issue...

  13. California Tribal Gasoline Permits

    EPA Pesticide Factsheets

    EPA is proposing a draft general permit under the Clean Air Act Federal Indian Country Minor NSR program for gasoline dispensing facilities, such as gas stations, located in Indian country within the geographical boundaries of California.

  14. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  15. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  16. 18 CFR 50.11 - General conditions applicable to permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...

  17. Laser materials processing facility

    NASA Technical Reports Server (NTRS)

    Haggerty, J. S.

    1982-01-01

    The laser materials processing facility and its capabilities are described. A CO2 laser with continuous wave, repetitive pulse, and shaped power-time cycles is employed. The laser heated crystal growth station was used to produce metal and metal oxide single crystals and for cutting and shaping experiments using Si3N4 to displace diamond shaping processes.

  18. NPDES Permit Status Reports

    EPA Pesticide Factsheets

    These reports show the backlog status nationwide, based on EPA databases and input from EPA regions and states. The reports show a snapshot in time, keep in mind that the status of facilities and the universe of permits change.

  19. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... facilities authorized by Presidential Permit No. PP-22, as amended, include seven single conductor 132 kilovolt (kV) submarine cables and three single conductor 260 kV DC submarine cables. These cables do not...

  20. 30 CFR 912.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO... without permits issued and/or certificates required by the State of Idaho, pursuant to Idaho Code sections...

  1. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  2. Approaches to Streamline Air Permitting for Combined Heat and Power: Permits by Rule and General Permits

    EPA Pesticide Factsheets

    This factsheet provides information about permit by rule (PBR) and general permit (GP) processes, including the factors that contributed to their development and lessons learned from their implementation.

  3. Evaluation of costs to process and manage utility and driveway permits.

    DOT National Transportation Integrated Search

    2014-10-01

    Reviewing and processing utility and driveway permits at the Texas Department of Transportation (TxDOT) : requires a considerable amount of involvement and coordination by TxDOT personnel, both at the district : and division levels. Currently, TxDOT ...

  4. 16 CFR 301.10 - Use of term “Broadtail-processed Lamb” permitted.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... “Broadtail-processed Lamb” permitted. The term Broadtail-processed Lamb may be used to describe the skin of a lamb which has been sheared, leaving a moire hair pattern on the pelt having the appearance of the true fur pattern of “Broadtail Lamb”; as for example: Dyed Broadtail-processed Lamb Fur origin: Argentina ...

  5. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  6. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  7. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  8. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  9. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  10. Notices of Intent for Coverage Under the NPDES General Permit for Oil and Gas Exploration Facilities on the Outer Continental Shelf in the Chukchi Sea

    EPA Pesticide Factsheets

    Notices of Intent (NOIs) submitted to EPA for coverage under the NPDES general permit for discharges from oil and gas exploration facilities on the outer continental shelf in the Chukchi Sea off Alaska.

  11. 77 FR 69769 - Solid Waste Rail Transfer Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    .... SUMMARY: These final rules govern land-use-exemption permits for solid waste rail transfer facilities. The... ``land-use-exemption permits'' in certain circumstances. Under the CRA, a solid waste rail transfer... grants a land-use-exemption permit for a solid waste rail transfer facility, such permit would only...

  12. The Facilities Audit. A Process for Improving Facilities Conditions.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    The problems of deferred maintenance and decaying campus infrastructure have troubled higher education for the past two decades. This book, designed to be a tool for facilities managers, describes a process for inspecting and reporting conditions of buildings and infrastructure. The audit process is meant to be a routine part of maintenance…

  13. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  14. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  15. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  16. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  17. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  18. 10 CFR 1016.9 - Processing security facility approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Processing security facility approval. 1016.9 Section 1016... § 1016.9 Processing security facility approval. The following receipt of an acceptable request for... granted pursuant to § 1016.6 of this part. ...

  19. 10 CFR 1016.9 - Processing security facility approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Processing security facility approval. 1016.9 Section 1016... § 1016.9 Processing security facility approval. The following receipt of an acceptable request for... granted pursuant to § 1016.6 of this part. ...

  20. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  1. 77 FR 15455 - Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Notice of Delays in Processing of Special Permits Applications AGENCY: Pipeline and Hazardous Materials Safety... and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of...

  2. Centrifuge Facility for the International Space Station Alpha

    NASA Technical Reports Server (NTRS)

    Johnson, Catherine C.; Hargens, Alan R.

    1994-01-01

    The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from

  3. 77 FR 42363 - Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... publishing the following list of special permit applications that have been in process for 180 days or more... Austin Powder 4 10-31-2012 Company, Cleveland, OH. 13548-P Interstate Battery 4 08-31-2012 System of The...

  4. 78 FR 22451 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 701, 736, 737, 738, and 750 [Docket ID OSM-2012-0003] RIN 1029-AC65 Cost Recovery for Permit Processing, Administration, and Enforcement Correction In proposed rule document R1-2013-06950, appearing on pages 20394...

  5. TEMPUS: A facility for containerless electromagnetic processing onboard spacelab

    NASA Technical Reports Server (NTRS)

    Lenski, H.; Willnecker, R.

    1990-01-01

    The electromagnetic containerless processing facility TEMPUS was recently assigned for a flight on the IML-2 mission. In comparison to the TEMPUS facility already flown on a sounding rocket, several improvements had to be implemented. These are in particular related to: safety; resource management; and the possibility to process different samples with different requirements in one mission. The basic design of this facility as well as the expected processing capabilities are presented. Two operational aspects turned out to strongly influence the facility design: control of the sample motion (first experimental results indicate that crew or ground interaction will be necessary to minimize residual sample motions during processing); and exchange of RF-coils (during processing in vacuum, evaporated sample materials will condense at the cold surface and may force a coil exchange, when a critical thickness is exceeded).

  6. EPA Facility Registry Service (FRS): PCS_NPDES

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Permit Compliance System (PCS) or the National Pollutant Discharge Elimination System (NPDES) module of the Integrated Compliance Information System (ICIS). PCS tracks NPDES surface water permits issued under the Clean Water Act. This system is being incrementally replaced by the NPDES module of ICIS. Under NPDES, all facilities that discharge pollutants from any point source into waters of the United States are required to obtain a permit. The permit will likely contain limits on what can be discharged, impose monitoring and reporting requirements, and include other provisions to ensure that the discharge does not adversely affect water quality. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NPDES facilities once the PCS or ICIS-NPDES data has been integrated into the FRS database. Additional information on FRS is available

  7. Region 9 NPDES Facilities - Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  8. An Application of Business Process Management to Health Care Facilities.

    PubMed

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  9. Integration Process for Payloads in the Fluids and Combustion Facility

    NASA Technical Reports Server (NTRS)

    Free, James M.; Nall, Marsha M.

    2001-01-01

    The Fluids and Combustion Facility (FCF) is an ISS research facility located in the United States Laboratory (US Lab), Destiny. The FCF is a multi-discipline facility that performs microgravity research primarily in fluids physics science and combustion science. This facility remains on-orbit and provides accommodations to multi-user and Principal investigator (PI) unique hardware. The FCF is designed to accommodate 15 PI's per year. In order to allow for this number of payloads per year, the FCF has developed an end-to-end analytical and physical integration process. The process includes provision of integration tools, products and interface management throughout the life of the payload. The payload is provided with a single point of contact from the facility and works with that interface from PI selection through post flight processing. The process utilizes electronic tools for creation of interface documents/agreements, storage of payload data and rollup for facility submittals to ISS. Additionally, the process provides integration to and testing with flight-like simulators prior to payload delivery to KSC. These simulators allow the payload to test in the flight configuration and perform final facility interface and science verifications. The process also provides for support to the payload from the FCF through the Payload Safety Review Panel (PSRP). Finally, the process includes support in the development of operational products and the operation of the payload on-orbit.

  10. 77 FR 823 - Guidance for Fuel Cycle Facility Change Processes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0262] Guidance for Fuel Cycle Facility Change Processes... Fuel Cycle Facility Change Processes.'' This regulatory guide describes the types of changes for which fuel cycle facility licensees should seek prior approval from the NRC and discusses how licensees can...

  11. Space Station Furnace Facility. Experiment/Facility Requirements Document (E/FRD), volume 2, appendix 5

    NASA Technical Reports Server (NTRS)

    Kephart, Nancy

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidifcation conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment, and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace.

  12. A Review of the Aging Process and Facilities Topic.

    PubMed

    Jornitz, Maik W

    2015-01-01

    Aging facilities have become a concern in the pharmaceutical and biopharmaceutical manufacturing industry, so much that task forces are formed by trade organizations to address the topic. Too often, examples of aging or obsolete equipment, unit operations, processes, or entire facilities have been encountered. Major contributors to this outcome are the failure to invest in new equipment, disregarding appropriate maintenance activities, and neglecting the implementation of modern technologies. In some cases, a production process is insufficiently modified to manufacture a new product in an existing process that was used to produce a phased-out product. In other instances, manufacturers expanded the facility or processes to fulfill increasing demand and the scaling occurred in a non-uniform manner, which led to non-optimal results. Regulatory hurdles of post-approval changes in the process may thwart companies' efforts to implement new technologies. As an example, some changes have required 4 years to gain global approval. This paper will address cases of aging processes and facilities aside from modernizing options. © PDA, Inc. 2015.

  13. 75 FR 5167 - Office of Hazardous Materials Safety; Notice of Delays In Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Office of Hazardous Materials Safety; Notice of Delays In Processing of Special Permits Applications AGENCY: Pipeline..., Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety...

  14. 75 FR 78800 - Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications AGENCY: Pipeline..., Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety...

  15. 50 CFR 622.240 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of..., respectively, must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a valid state wholesaler's license in the state(s) where the dealer...

  16. Region 9 NPDES Facilities 2012- Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  17. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    EPA Pesticide Factsheets

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  18. NPDES Permit Walter Reed Army Medical Center

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000361, the Department of the Army is authorized to discharge from a facility located at Walter Reed Army Medical Center into receiving waters named Rock Creek.

  19. Permit Limit and Monitoring Requirements Report Help ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  20. Material Processing Facility - Skylab Experiment M512

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This chart details Skylab's Materials Processing Facility experiment (M512). This facility, located in the Multiple Docking Adapter, was developed for Skylab and accommodated 14 different experiments that were carried out during the three marned missions. The abilities to melt and mix without the contaminating effects of containers, to suppress thermal convection and buoyancy in fluids, and to take advantage of electrostatic and magnetic forces and otherwise masked by gravitation opened the way to new knowledge of material properties and processes. This beginning would ultimately lead to the production of valuable new materials for use on Earth.

  1. 50 CFR 648.6 - Dealer/processor permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... herring, Atlantic sea scallop, Atlantic deep-sea red crab, spiny dogfish, summer flounder, Atlantic surf... permitted vessel of the United States. (ii) Atlantic herring at-sea processing permit. A vessel of the... eligible to obtain an Atlantic herring at-sea processing permit to receive and process Atlantic herring...

  2. Insect pest management decisions in food processing facilities

    USDA-ARS?s Scientific Manuscript database

    Pest management decision making in food processing facilities such as flour mills, rice mills, human and pet food manufacturing facilities, distribution centers and warehouses, and retail stores is a challenging undertaking. Insect pest management programs require an understanding of the food facili...

  3. Skylab materials processing facility experiment developer's report

    NASA Technical Reports Server (NTRS)

    Parks, P. G.

    1975-01-01

    The development of the Skylab M512 Materials Processing Facility is traced from the design of a portable, self-contained electron beam welding system for terrestrial applications to the highly complex experiment system ultimately developed for three Skylab missions. The M512 experiment facility was designed to support six in-space experiments intended to explore the advantages of manufacturing materials in the near-zero-gravity environment of Earth orbit. Detailed descriptions of the M512 facility and related experiment hardware are provided, with discussions of hardware verification and man-machine interfaces included. An analysis of the operation of the facility and experiments during the three Skylab missions is presented, including discussions of the hardware performance, anomalies, and data returned to earth.

  4. 78 FR 38555 - Importer Permit Requirements for Tobacco Products and Processed Tobacco, and Other Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ...This temporary rule amends the regulations of the Alcohol and Tobacco Tax and Trade Bureau (TTB) pertaining to permits for importers of tobacco products and processed tobacco by extending the duration of new permits from three years to five years. Based on its experience in the administration and enforcement of importer permits over the past decade, TTB believes that it can gain administrative efficiencies and reduce the burden on industry members, while still meeting the purposes of the limited-duration permit, by extending the permit duration to five years. This temporary rule also makes several technical corrections by amending the definition of ``Manufacturer of tobacco products'' to reflect a recent statutory change, and by amending a reference to the sale price of large cigars to incorporate a clarification published in a prior TTB temporary rule. Finally, this temporary rule incorporates and reissues TTB regulations pertaining to importer permit requirements for tobacco products, and minimum manufacturing and marking requirements for tobacco products and cigarette papers and tubes, and, as a result, these temporary regulations replace temporary regulations originally published in 1999. TTB is soliciting comments from all interested parties on these regulatory provisions through a notice of proposed rulemaking published elsewhere in this issue of the Federal Register.

  5. Sources Approved for Coverage under the SQCS General Permit in Region 8

    EPA Pesticide Factsheets

    The sources on Indian country reservation lands that the Region 8 has approved for coverage under the General Air Quality Permit for New and Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country (SQCS General Permit).

  6. Public input in the permitting process: the Section 404 example

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tripp, J.T.B.

    Section 404 of the Clean Water Act illustrates the potential effectiveness of public input in the permitting process. Section 404 should, if strictly applied, reduce wetland loss, but the federal administrative agency's traditional role has been development rather than protection of these areas. As a result of citizen group activities, the Corps of Engineers has not been able to restrict the scope of Clean Water Act jurisdiction as much as they would have without the citizen input. One problem with the Corp's approach is with the specific descriptions of alternatives that often preclude a practical alternative. Public input is amore » necessary part of the democratic process by which the public establishes its values and preferences through persuasion and, when necessary, legal action.« less

  7. 9 CFR 130.4 - User fees for processing import permit applications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., vectors, or germ plasm (embryos or semen) or to transport organisms or vectors1 Initial permit Per... Transit Permit (Animals, Animal Semen, Animal Embryos, Birds, Poultry, or Hatching Eggs).” 2 Permits to...

  8. 9 CFR 130.4 - User fees for processing import permit applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., vectors, or germ plasm (embryos or semen) or to transport organisms or vectors1 Initial permit Per... Transit Permit (Animals, Animal Semen, Animal Embryos, Birds, Poultry, or Hatching Eggs).” 2 Permits to...

  9. 9 CFR 130.4 - User fees for processing import permit applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., vectors, or germ plasm (embryos or semen) or to transport organisms or vectors1 Initial permit Per... Transit Permit (Animals, Animal Semen, Animal Embryos, Birds, Poultry, or Hatching Eggs).” 2 Permits to...

  10. 9 CFR 130.4 - User fees for processing import permit applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., vectors, or germ plasm (embryos or semen) or to transport organisms or vectors1 Initial permit Per... Transit Permit (Animals, Animal Semen, Animal Embryos, Birds, Poultry, or Hatching Eggs).” 2 Permits to...

  11. 9 CFR 130.4 - User fees for processing import permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., vectors, or germ plasm (embryos or semen) or to transport organisms or vectors1 Initial permit Per... Transit Permit (Animals, Animal Semen, Animal Embryos, Birds, Poultry, or Hatching Eggs).” 2 Permits to...

  12. Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF

    EPA Pesticide Factsheets

    Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.

  13. An Analytical Impact Assessment Framework for Wildlife to Inform the Siting and Permitting of Wind Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.

    In the United States overall electrical generation capacity is expected to increase by 10-25 gigawatts (GW) per year to meet increases in demand. Wind energy is a key component of state and federal renewable energy standards, and central to the Department of Energy’s 20% by 2030 wind production goals. Increased wind energy development may present increased resource conflict with avian wildlife, and environmental permitting has been identified as a potential obstacle to expansion in the sector. ICF developed an analytical framework to help applicants and agencies examine potential impacts in support of facility siting and permitting. A key objective ofmore » our work was to develop a framework that is scalable from the local to the national level, and one that is generalizable across the different scales at which biological communities operate – from local influences to meta-populations. The intent was to allow natural resource managers to estimate the cumulative impacts of turbine strikes and habitat changes on long-term population performance in the context of a species demography, genetic potential, and life history. We developed three types of models based on our literature review and participation in the scientific review processes. First, the conceptual model was developed as a general description of the analytical framework. Second, we developed the analytical framework based on the relationships between concepts, and the functions presented in the scientific literature. Third, we constructed an application of the model by parameterizing the framework using data from and relevant to the Altamont Pass Wind Resource Area (APWRA), and an existing golden eagle population model. We developed managed source code, database create statements, and written documentation to allow for the reproduction of each phase of the analysis. ICF identified a potential template adaptive management system in the form of the US Fish & Wildlife Service (USFWS) Adaptive Harvest

  14. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  15. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  16. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  17. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  18. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  19. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  20. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  1. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  2. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  3. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  4. 76 FR 44049 - Guidance for Fuel Cycle Facility Change Processes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0262] Guidance for Fuel Cycle Facility Change Processes...-issued Draft Regulatory Guide, DG- 3037, ``Guidance for Fuel Cycle Facility Change Processes'' in the...-3037 from August 12, 2011 to September 16, 2011. DG-3037 describes the types of changes for fuel cycle...

  5. ICIS-NPDES Permit Limit and Discharge Monitoring Report ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  6. NPDES Permit for National World War II Memorial

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000345, the National World War II Memorial is authorized to discharge from a facility located at 17th St. and Independence Ave., S.W. Washington DC 20024.

  7. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Astrophysics Data System (ADS)

    1992-05-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  8. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  9. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    At the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida, members of the news media photograph the process as cranes are used to lift one of two pathfinders, or test versions, of solid rocket booster segments for NASA’s Space Launch System rocket. The Ground Systems Development and Operations Program and Jacobs Engineering, on the Test and Operations Support Contract, are preparing the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  10. NPDES Permit for Wulf Cattle Depot in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0034606, the Wulf Cattle Depot is authorized to discharge and must operate their facility in accordance with effluent limitations, monitoring requirements, and other provisions set forth herein.

  11. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  12. Race, Wealth, and Solid Waste Facilities in North Carolina

    PubMed Central

    Norton, Jennifer M.; Wing, Steve; Lipscomb, Hester J.; Kaufman, Jay S.; Marshall, Stephen W.; Cravey, Altha J.

    2007-01-01

    Background Concern has been expressed in North Carolina that solid waste facilities may be disproportionately located in poor communities and in communities of color, that this represents an environmental injustice, and that solid waste facilities negatively impact the health of host communities. Objective Our goal in this study was to conduct a statewide analysis of the location of solid waste facilities in relation to community race and wealth. Methods We used census block groups to obtain racial and economic characteristics, and information on solid waste facilities was abstracted from solid waste facility permit records. We used logistic regression to compute prevalence odds ratios for 2003, and Cox regression to compute hazard ratios of facilities issued permits between 1990 and 2003. Results The adjusted prevalence odds of a solid waste facility was 2.8 times greater in block groups with ≥50% people of color compared with block groups with < 10% people of color, and 1.5 times greater in block groups with median house values < $60,000 compared with block groups with median house values ≥$100,000. Among block groups that did not have a previously permitted solid waste facility, the adjusted hazard of a new permitted facility was 2.7 times higher in block groups with ≥50% people of color compared with block groups with < 10% people of color. Conclusion Solid waste facilities present numerous public health concerns. In North Carolina solid waste facilities are disproportionately located in communities of color and low wealth. In the absence of action to promote environmental justice, the continued need for new facilities could exacerbate this environmental injustice. PMID:17805426

  13. 34 CFR 395.34 - Application for permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL...

  14. NPDES Permit for Shoshone Utility Organization in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0044580, the Shoshone Utility Organization is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to an unnamed irrigation drainage ditch tributary to the South Fork of the Little Wind R.

  15. NPDES Permit for Chemtrade Refinery Services in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0034207, Chemtrade Refinery Services, Inc. is authorized to discharge from its wastewater treatment facility located in Fremont County,Wyoming, to an unnamed drainage way that flows into the Little Wind River near St. Stephens, Wyo.

  16. The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiser, Ryan; Dong, Changgui

    Business process or “soft” costs account for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, so understanding these costs is crucial for identifying PV cost-reduction opportunities. Among these costs are those imposed by city-level permitting processes, which may add both expense and time to the PV development process. Building on previous research, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop and install those systems. The study uses a unique dataset from the U.S. Department of Energy’smore » Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Econometric methods are used to quantify the price and development-time effects of city-level permitting processes on more than 3,000 PV installations across 44 California cities in 2011. Results indicate that city-level permitting processes have a substantial and statistically significant effect on average installation prices and project development times. The results suggest that cities with the most favorable (i.e., highest-scoring) permitting practices can reduce average residential PV prices by $0.27–$0.77/W (4%–12% of median PV prices in California) compared with cities with the most onerous (i.e., lowest-scoring) permitting practices, depending on the regression model used. Though the empirical models for development times are less robust, results suggest that the most streamlined permitting practices may shorten development times by around 24 days on average (25% of the median development time). These findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems.« less

  17. 34 CFR 395.34 - Application for permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...

  18. 34 CFR 395.35 - Terms of permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Terms of permit. 395.35 Section 395.35 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...

  19. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    The right-hand aft skirt, one part of the aft booster assembly for NASA’s Space Launch System solid rocket boosters, is in view in a processing cell inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS rocket boosters. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  20. Hanford solid-waste handling facility strategy

    NASA Astrophysics Data System (ADS)

    Albaugh, J. F.

    1982-05-01

    Prior to 1970, transuranic (TRU) solid waste was disposed of at Hanford by shallow land burial. Since 1970, TRU solid waste has been stored in near surface trenches designed to facilitate retrieval after twenty year storage period. Current strategy calls for final disposal in a geologic repository. Funding permitting, in 1983, certification of newly generated TRU waste to the Waste Isolation Pilot Plant (WIPP) criteria for geologic disposal will be initiated. Certified and uncertified waste will continue to be stored at Hanford in retrievable storage until a firm schedule for shipment to WIPP is developed. Previously stored wastes retrieved for geologic disposal and newly generated uncertified waste requires processing to assure compliance with disposal criteria. A facility to perform this function is being developed. A study to determine the requirements of this Waste Receiving and Processing (WRAP) Facility is currently being conducted.

  1. Lean in Air Permitting Guide

    EPA Pesticide Factsheets

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  2. Spacelab Data Processing Facility (SLDPF) quality assurance expert systems development

    NASA Technical Reports Server (NTRS)

    Kelly, Angelita C.; Basile, Lisa; Ames, Troy; Watson, Janice; Dallam, William

    1987-01-01

    Spacelab Data Processing Facility (SLDPF) expert system prototypes were developed to assist in the quality assurance of Spacelab and/or Attached Shuttle Payload (ASP) processed telemetry data. The SLDPF functions include the capturing, quality monitoring, processing, accounting, and forwarding of mission data to various user facilities. Prototypes for the two SLDPF functional elements, the Spacelab Output Processing System and the Spacelab Input Processing Element, are described. The prototypes have produced beneficial results including an increase in analyst productivity, a decrease in the burden of tedious analyses, the consistent evaluation of data, and the providing of concise historical records.

  3. Spacelab Data Processing Facility (SLDPF) quality assurance expert systems development

    NASA Technical Reports Server (NTRS)

    Kelly, Angelita C.; Basile, Lisa; Ames, Troy; Watson, Janice; Dallam, William

    1987-01-01

    Spacelab Data Processing Facility (SLDPF) expert system prototypes have been developed to assist in the quality assurance of Spacelab and/or Attached Shuttle Payload (ASP) processed telemetry data. SLDPF functions include the capturing, quality monitoring, processing, accounting, and forwarding of mission data to various user facilities. Prototypes for the two SLDPF functional elements, the Spacelab Output Processing System and the Spacelab Input Processing Element, are described. The prototypes have produced beneficial results including an increase in analyst productivity, a decrease in the burden of tedious analyses, the consistent evaluation of data, and the providing of concise historical records.

  4. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhatt, Arpit H; Zhang, Yi Min

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major sourcemore » threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.« less

  5. 40 CFR 144.36 - Duration of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Class II and III wells shall be issued for a period up to the operating life of the facility. The... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Duration of permits. 144.36 Section 144.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED...

  6. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  7. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  8. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  9. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  10. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  11. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  12. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  13. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  14. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental...

  15. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  16. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  17. NPDES Permit for Transit Waste's Bondad Landfill in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-R050005, Transit Waste, LLC is authorized to discharge from the Bondad Landfill facility in La Plata County, Colorado, to an unnamed tributary of the Animas River.

  18. NPDES Permit for Leadville National Fish Hatchery in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-0000582, the U.S. Department of the Interior, Fish and Wildlife Service is authorized to discharge from its Leadville National Fish Hatchery wastewater treatment facility in Colorado.

  19. 49 CFR 1155.26 - Transfer and termination of a land-use-exemption permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Transfer and termination of a land-use-exemption permit. 1155.26 Section 1155.26 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.26 Transfer and...

  20. NPDES Permit for General Services Administration (GSA) West Heating Plant

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000035, General Services Administration (GSA) West Heating Plant is authorized to discharge from a facility to receiving waters named Rock Creek.

  1. NPDES Permit for Crossfire-Bonds Gravel Pit in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-0035024, the Crossfire-Bonds Gravel Pit is authorized to discharge from its wastewater treatement facility in Plata County, Colorado, to Deer Canyon, a tributary of the Animas River.

  2. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  3. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  4. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  5. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  6. Inspection of Forrestal parking permit allocation and assignments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-16

    The purpose of this inspection was to review the process cr allocating and assigning parking permits at the Forrestal building. Specifically, we sought to determine the roles and responsibilities of Department of Energy (DOE) officials involved in the administration of the Forrestal parking permit process during the period June 1, 1991 to February 1, 1992. We also sought to determine if the allocation and assignment of Forrestal building parking spaces was implemented in accordance with Federal and DOE requirements. For our review, we interviewed the Headquarters officials involved in the administration of the parking permit allocation and assignment process. Wemore » also reviewed parking permit files and associated documentation for the period June 1, 1991 through February 1, 1992. In addition, we conducted a limited sampling of parking permits that were revoked during July and August 1991 to assess if they were processed in compliance with applicable regulations. We found no evidence that the actions by the Special Assistant to the Secretary (White House Liaison) and the other members of the parking committee regarding the issuance and revocation of parking permits were for any reason other than a desire to ensure that only individuals having a legitimate basis for a parking permit were issued a permit. However, we found that decisions by the parking committee regarding revocation of permits and appeals of revocation decisions were not always documented, nor were there written guidelines or procedures to govern the activities of the committee. In our view, the lack of written guidelines and procedures resulted in the use of invalidated personal knowledge by the parking committee in making decisions involving the revocation of parking permits and led to inconsistencies in the notification of individuals about the associated appeal process.« less

  7. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  8. Data requirements for valuing externalities: The role of existing permitting processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, A.D.; Baechler, M.C.; Callaway, J.M.

    1990-08-01

    While the assessment of externalities, or residual impacts, will place new demands on regulators, utilities, and developers, existing processes already require certain data and information that may fulfill some of the data needs for externality valuation. This paper examines existing siting, permitting, and other processes and highlights similarities and differences between their data requirements and the data required to value environmental externalities. It specifically considers existing requirements for siting new electricity resources in Oregon and compares them with the information and data needed to value externalities for such resources. This paper also presents several observations about how states can takemore » advantage of data acquired through processes already in place as they move into an era when externalities are considered in utility decision-making. It presents other observations on the similarities and differences between the data requirements under existing processes and those for valuing externalities. This paper also briefly discusses the special case of cumulative impacts. And it presents recommendations on what steps to take in future efforts to value externalities. 35 refs., 2 tabs.« less

  9. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  10. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  11. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  12. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  13. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  14. Proposal for a new categorization of aseptic processing facilities based on risk assessment scores.

    PubMed

    Katayama, Hirohito; Toda, Atsushi; Tokunaga, Yuji; Katoh, Shigeo

    2008-01-01

    Risk assessment of aseptic processing facilities was performed using two published risk assessment tools. Calculated risk scores were compared with experimental test results, including environmental monitoring and media fill run results, in three different types of facilities. The two risk assessment tools used gave a generally similar outcome. However, depending on the tool used, variations were observed in the relative scores between the facilities. For the facility yielding the lowest risk scores, the corresponding experimental test results showed no contamination, indicating that these ordinal testing methods are insufficient to evaluate this kind of facility. A conventional facility having acceptable aseptic processing lines gave relatively high risk scores. The facility showing a rather high risk score demonstrated the usefulness of conventional microbiological test methods. Considering the significant gaps observed in calculated risk scores and in the ordinal microbiological test results between advanced and conventional facilities, we propose a facility categorization based on risk assessment. The most important risk factor in aseptic processing is human intervention. When human intervention is eliminated from the process by advanced hardware design, the aseptic processing facility can be classified into a new risk category that is better suited for assuring sterility based on a new set of criteria rather than on currently used microbiological analysis. To fully benefit from advanced technologies, we propose three risk categories for these aseptic facilities.

  15. NPDES Permit for Glendale Colony and Harvey Farms in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0031819, Glendale Colony, Inc., and Harvey Farms, Inc. are authorized to discharge and must operate their facilities in accordance with provisions set forth herein.Indian Country on the Blackfeet Reserva

  16. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... (CONTINUED) WATER PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.10 Public notice... Act for the same facility or activity (including EPA when the draft permit is prepared by the State...

  17. NPDES Permit for Super Concrete Ready-Mix Corp. (Aggregate Industries)

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000175, Super Concrete Ready-Mix Corporation is authorized to discharge from a facility to receiving waters named unnamed tributary to Northwest Branch of the Anacostia River.

  18. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  19. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  20. 46 CFR 2.01-45 - Excursion permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., on Coast Guard Form CG-950, Application for Excursion Permit. If, after inspection, permission is... the application process for excursion permits for inspected passenger vessels are contained in §§ 71.10, 115.204, or 176.204 of this chapter. Details concerning the application process for special...

  1. A software for managing after-hours activities in research user facilities

    DOE PAGES

    Camino, F. E.

    2017-05-01

    Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.

  2. A software for managing after-hours activities in research user facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camino, F. E.

    Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.

  3. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    At the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida, members of the news media watch as cranes are used to lift one of two pathfinders, or test versions, of solid rocket booster segments for NASA’s Space Launch System rocket. The Ground Systems Development and Operations Program and Jacobs Engineering, on the Test and Operations Support Contract, are preparing the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  4. Petition Requesting the Administrator Object to Title V Permit for ABC Coke Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Providing security for automated process control systems at hydropower engineering facilities

    NASA Astrophysics Data System (ADS)

    Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.

    2016-12-01

    This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.

  6. NPDES Permit for Wesco Operating, Inc. – Maverick Springs in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000469, Wesco Operating, Inc. - Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  7. 40 CFR 122.63 - Minor modifications of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Minor modifications of permits. 122.63..., Revocation and Reissuance, and Termination of Permits § 122.63 Minor modifications of permits. Upon the.... Any permit modification not processed as a minor modification under this section must be made for...

  8. High Vacuum Creep Facility in the Materials Processing Laboratory

    NASA Image and Video Library

    1973-01-21

    Technicians at work in the Materials Processing Laboratory’s Creep Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The technicians supported the engineers’ studies of refractory materials, metals, and advanced superalloys. The Materials Processing Laboratory contained laboratories and test areas equipped to prepare and develop these metals and materials. The ultra-high vacuum lab, seen in this photograph, contained creep and tensile test equipment. Creep testing is used to study a material’s ability to withstand long durations under constant pressure and temperatures. The equipment measured the strain over a long period of time. Tensile test equipment subjects the test material to strain until the material fails. The two tests were used to determine the strength and durability of different materials. The Materials Processing Laboratory also housed arc and electron beam melting furnaces, a hydraulic vertical extrusion press, compaction and forging equipment, and rolling mills and swagers. There were cryogenic and gas storage facilities and mechanical and oil diffusion vacuum pumps. The facility contained both instrumental and analytical chemistry laboratories for work on radioactive or toxic materials and the only shop to machine toxic materials in the Midwest.

  9. NPDES Draft Permit for Spirit Lake Water Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit ND-0031101, Spirit Lake Water Resource Management is authorized to discharge to an unnamed intermittent tributary to Devils Lake which is tributary to Sheyenne River in North Dakota.

  10. Manufacturing Demonstration Facility: Roll-to-Roll Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Datskos, Panos G; Joshi, Pooran C; List III, Frederick Alyious

    This Manufacturing Demonstration Facility (MDF)e roll-to-roll processing effort described in this report provided an excellent opportunity to investigate a number of advanced manufacturing approaches to achieve a path for low cost devices and sensors. Critical to this effort is the ability to deposit thin films at low temperatures using nanomaterials derived from nanofermentation. The overarching goal of this project was to develop roll-to-roll manufacturing processes of thin film deposition on low-cost flexible substrates for electronics and sensor applications. This project utilized ORNL s unique Pulse Thermal Processing (PTP) technologies coupled with non-vacuum low temperature deposition techniques, ORNL s clean roommore » facility, slot dye coating, drop casting, spin coating, screen printing and several other equipment including a Dimatix ink jet printer and a large-scale Kyocera ink jet printer. The roll-to-roll processing project had three main tasks: 1) develop and demonstrate zinc-Zn based opto-electronic sensors using low cost nanoparticulate structures manufactured in a related MDF Project using nanofermentation techniques, 2) evaluate the use of silver based conductive inks developed by project partner NovaCentrix for electronic device fabrication, and 3) demonstrate a suite of low cost printed sensors developed using non-vacuum deposition techniques which involved the integration of metal and semiconductor layers to establish a diverse sensor platform technology.« less

  11. NPDES Permit for Marathon Oil Company – Circle Ridge in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000949, the Marathon Oil Company – Circle Ridge is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Coal Draw.

  12. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  13. Proposed Reopening of NPDES Permit for NTUA Tuba City WWTF

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to reopen a National Pollutant Discharge Elimination System (NPDES) permit NN0020290 issued to the Navajo Tribal Utility Authority (NTUA) Tuba City Wastewater Treatment Facility.

  14. Development and Validation of Pathogen Environmental Monitoring Programs for Small Cheese Processing Facilities.

    PubMed

    Beno, Sarah M; Stasiewicz, Matthew J; Andrus, Alexis D; Ralyea, Robert D; Kent, David J; Martin, Nicole H; Wiedmann, Martin; Boor, Kathryn J

    2016-12-01

    Pathogen environmental monitoring programs (EMPs) are essential for food processing facilities of all sizes that produce ready-to-eat food products exposed to the processing environment. We developed, implemented, and evaluated EMPs targeting Listeria spp. and Salmonella in nine small cheese processing facilities, including seven farmstead facilities. Individual EMPs with monthly sample collection protocols were designed specifically for each facility. Salmonella was detected in only one facility, with likely introduction from the adjacent farm indicated by pulsed-field gel electrophoresis data. Listeria spp. were isolated from all nine facilities during routine sampling. The overall Listeria spp. (other than Listeria monocytogenes ) and L. monocytogenes prevalences in the 4,430 environmental samples collected were 6.03 and 1.35%, respectively. Molecular characterization and subtyping data suggested persistence of a given Listeria spp. strain in seven facilities and persistence of L. monocytogenes in four facilities. To assess routine sampling plans, validation sampling for Listeria spp. was performed in seven facilities after at least 6 months of routine sampling. This validation sampling was performed by independent individuals and included collection of 50 to 150 samples per facility, based on statistical sample size calculations. Two of the facilities had a significantly higher frequency of detection of Listeria spp. during the validation sampling than during routine sampling, whereas two other facilities had significantly lower frequencies of detection. This study provides a model for a science- and statistics-based approach to developing and validating pathogen EMPs.

  15. 78 FR 53493 - Presidential Permits: NOVA Chemicals Inc. Line 20 Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... natural gas liquids from the United States to Ontario, Canada. The Line 20 facilities were constructed in 1986 and operated most recently by another entity for the transport of natural gas pursuant to a..., for the export of natural gas liquids from the United States to Canada. The term ``facilities'' as...

  16. NPDES Permit for Potomac Electric Power Company (PEPCO) Benning Generating Station

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000094, the Potomac Electric Power Company (PEPCO) Benning Generating Station is authorized to discharge from from a facility to receiving waters named Anacostia River.

  17. NPDES Permit for Marathon Oil Company – Maverick Springs in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000779, the Marathon Oil Company – Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  18. NPDES Permit for Marathon Oil Company – Chatterton Battery in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000922, the Marathon Oil Company – Chatterton Battery is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  19. 41 CFR 102-74.280 - Are privately owned vehicles converted for propane carburetion permitted in underground parking...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are privately owned vehicles converted for propane carburetion permitted in underground parking facilities? 102-74.280 Section...

  20. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media watch as a crane is used to move one of two pathfinders, or test versions, of solid rocket booster segments for NASA’s Space Launch System rocket to a test stand in the Rotation, Processing and Surge Facility at NASA’s Kennedy Space Center in Florida. Inside the RPSF, the Ground Systems Development and Operations Program and Jacobs Engineering, on the Test and Operations Support Contract, will prepare the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  1. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media view forward booster segments (painted green) for NASA’s Space Launch System rocket boosters inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS rocket boosters. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  2. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  3. Animal research facility for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Bonting, Sjoerd L.

    1992-01-01

    An integrated animal research facility is planned by NASA for Space Station Freedom which will permit long-term, man-tended experiments on the effects of space conditions on vertebrates. The key element in this facility is a standard type animal habitat which supports and maintains the animals under full bioisolation during transport and during the experiment. A holding unit accommodates the habitats with animals to be maintained at zero gravity; and a centrifuge, those to be maintained at artificial gravity for control purposes or for gravity threshold studies. A glovebox permits handling of the animals for experimental purposes and for transfer to a clean habitat. These facilities are described, and the aspects of environmental control, monitoring, and bioisolation are discussed.

  4. Reducing concentrated animal feeding operations permitting requirements.

    PubMed

    Centner, T J; Newton, G L

    2011-12-01

    Many owners and operators of concentrated animal feeding operations (CAFO) need to secure National Pollutant Discharge Elimination System permits from the federal or state permitting authority. Because of the expense and inconvenience of permit applications, farm groups have challenged revisions to the federal CAFO Rule as well as state regulations claiming selected provisions exceeded the authority of the permitting agency. In 2011, 2 courts responded with decisions that clarify federal and state permitting regulations. Another goal of agricultural groups is to change the regulatory authority of the state from an environmental agency to a department of agriculture. These developments suggest that by altering the permitting authority, CAFO owners and operators may alleviate some of the burdens of the permitting process.

  5. Automation of electromagnetic compatability (EMC) test facilities

    NASA Technical Reports Server (NTRS)

    Harrison, C. A.

    1986-01-01

    Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.

  6. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  7. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  8. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  9. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  10. Development of experimental facilities for processing metallic crystals in orbit

    NASA Technical Reports Server (NTRS)

    Duncan, Bill J.

    1990-01-01

    This paper discusses the evolution, current status, and planning for facilities to exploit the microgravity environment of earth orbit in applied metallic materials science. Space-Shuttle based facilities and some precursor flight programs are reviewed. Current facility development programs and planned Space Station furnace capabilities are described. The reduced gravity levels available in earth orbit allow the processing of metallic materials without the disturbing influence of gravitationally induced thermal convection, stratification due to density differences in sample components, or the effects of hydrostatic pressure.

  11. Should Advertising by Aesthetic Surgeons be Permitted?

    PubMed Central

    Nagpal, Neeraj

    2017-01-01

    Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations. PMID:28529421

  12. The National Solar Permitting Database

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunderson, Renic

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identifymore » best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."« less

  13. Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, Ben C.; Heacker, Fred K.; Shannon, Christopher

    2013-07-01

    install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)« less

  14. NPDES Permit for Fort Carson Landfill No. 5 in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034771, the United States Army, HQ, Fort Carson, is authorized to discharge groundwater seepage from the Landfill No. 5 facility at the Fort Carson Army Post in El Paso County, Colorado, to B Ditch, a tributary of Fountain Creek.

  15. Environmental process improvement feasibility study and demonstration program

    NASA Technical Reports Server (NTRS)

    Martin, Rodger L.

    1994-01-01

    This report is the final product of an environmental study conducted by Western Commercial Space Center, Inc. under contract to Tennessee-Calspan Center for Space Transportation and Applied Research. The purpose of this investigation is to accurately document the current environmental and permitting processes associated with commercial space launch activity at Vandenberg AFB, and make recommendations to streamline those processes. The particular areas of interest focus on: identifying applicable Federal, state, and local laws, Department of Defense directives, and Air force regulations; defining the environmental process on Vandenberg AFB and how it relates with other agencies, including Federal and state regulatory agencies; and defining the air quality permit process. Study investigation results are applied to an example Pilot Space Launch Vehicle (PSLV) planning to launch from Vandenberg AFB. The PSLV space hardware is analyzed with respect to environmental and permitting issues associated with vehicle processing, facilities required (existing or new), and launch. The PSLV verified the earlier findings of the study and gave insight into streamlining recommendations.

  16. 49 CFR 1155.20 - Notice of intent to apply for a land-use-exemption permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Notice of intent to apply for a land-use-exemption permit. 1155.20 Section 1155.20 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.20 Notice of intent to...

  17. Nuclear Waste: Defense Waste Processing Facility-Cost, Schedule, and Technical Issues.

    DTIC Science & Technology

    1992-06-17

    gallons of high-level radioactive waste stored in underground tanks at the savannah major facility involved Is the Defense Waste Processing Facility ( DwPF ...As a result of concerns about potential problems with the DWPF and delays in its scheduled start-up, the Chairman of the Environment, Energy, and...Natural Resources Subcommittee, House Committee on Government Operations, asked GAO to review the status of the DWPF and other facilities. This report

  18. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  19. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  20. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  1. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  2. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  3. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema

    None

    2018-05-23

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  4. NPDES Permit for NRG Energy (Formerly GenOn Potomac River Generating Station)

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0022004, NRG Energy (Formerly GenOn Potomac River Generating Station) is authorized to discharge from a facility into receiving waters named Potomac River.

  5. NPDES Permit for Arboles Sand & Stone's Lob Lolly Industrial Site in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0048194, Arboles Sand & Stone, LLC is authorized to discharge from its wastewater treatment facility at the Lob Lolly Industrial Site in Archuleta County, Colorado, to the Piedra River.

  6. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media view the high bay inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida. Inside the RPSF, engineers and technicians with Jacobs Engineering on the Test and Operations Support Contract, explain the various test stands. In the far corner is one of two pathfinders, or test versions, of solid rocket booster segments for NASA’s Space Launch System rocket. The Ground Systems Development and Operations Program and Jacobs are preparing the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  7. Critical Protection Item classification for a waste processing facility at Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ades, M.J.; Garrett, R.J.

    1993-10-01

    This paper describes the methodology for Critical Protection Item (CPI) classification and its application to the Structures, Systems and Components (SSC) of a waste processing facility at the Savannah River Site (SRS). The WSRC methodology for CPI classification includes the evaluation of the radiological and non-radiological consequences resulting from postulated accidents at the waste processing facility and comparison of these consequences with allowable limits. The types of accidents considered include explosions and fire in the facility and postulated accidents due to natural phenomena, including earthquakes, tornadoes, and high velocity straight winds. The radiological analysis results indicate that CPIs are notmore » required at the waste processing facility to mitigate the consequences of radiological release. The non-radiological analysis, however, shows that the Waste Storage Tank (WST) and the dike spill containment structures around the formic acid tanks in the cold chemical feed area and waste treatment area of the facility should be identified as CPIs. Accident mitigation options are provided and discussed.« less

  8. RCRA Facility Information

    EPA Pesticide Factsheets

    This asset includes hazardous waste information, which is mostly contained in the Resource Conservation and Recovery Act Information (RCRAInfo) System, a national program management and inventory system addressing hazardous waste handlers. In general, all entities that generate, transport, treat, store, and dispose of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies pass on that information to regional and national EPA offices. This regulation is governed by the Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984. RCRAInfo Search can be used to determine identification and location data for specific hazardous waste handlers and to find a wide range of information on treatment, storage, and disposal facilities regarding permit/closure status, compliance with Federal and State regulations, and cleanup activities. Categories of information in this asset include:-- Handlers-- Permit Information-- GIS information on facility location-- Financial Assurance-- Corrective Action-- Compliance Monitoring and Enforcement (CM&E)

  9. 40 CFR 144.41 - Minor modifications of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Minor modifications of permits. 144.41... (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.41 Minor modifications of... part 124. Any permit modification not processed as a minor modification under this section must be made...

  10. 10 CFR 1016.8 - Approval for processing access permittees for security facility approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Approval for processing access permittees for security facility approval. 1016.8 Section 1016.8 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SAFEGUARDING OF RESTRICTED DATA Physical Security § 1016.8 Approval for processing access permittees for security facility...

  11. 10 CFR 1016.8 - Approval for processing access permittees for security facility approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Approval for processing access permittees for security facility approval. 1016.8 Section 1016.8 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SAFEGUARDING OF RESTRICTED DATA Physical Security § 1016.8 Approval for processing access permittees for security facility...

  12. Petition for the Administrator to Object to Title V Permit for Walter Coke Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. 78 FR 73582 - Presidential Permit for Kinder Morgan Cochin, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... conditions: Article 1. (1) The United States facilities herein described, and all aspects of their operation... Presidential Permit (the ``Application''). Article 2. The standards for, and the manner of, the operation and... their official duties. Article 3. The permittee shall comply with all applicable federal, state, and...

  14. 40 CFR 239.4 - Narrative description of state permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-hazardous waste disposal units that receive CESQG hazardous waste, January 1, 1998. (e) A discussion of... WASTES REQUIREMENTS FOR STATE PERMIT PROGRAM DETERMINATION OF ADEQUACY State Program Application § 239.4...; (d) The number of facilities within the state's jurisdiction that received waste on or after the...

  15. Fisher Sand & Gravel New Mexico, Inc. General Air Quality Permit: Related Documents

    EPA Pesticide Factsheets

    Documents related to the Fisher Sand & Gravel – New Mexico, Inc., Grey Mesa Gravel Pit General Air Quality Permit for New or Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country.

  16. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... exempt from the requirements of this section. [48 FR 33820, July 25, 1983] Report of Major Electric...

  17. Review and revision of overload permit classification.

    DOT National Transportation Integrated Search

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  18. 75 FR 11150 - Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23) filed an application for a preliminary permit... new 2.6-mile- long, 23-kilovolt transmission line; and (5) appurtenant facilities. The proposed...

  19. Reduction of Environmental Listeria Using Gaseous Ozone in a Cheese Processing Facility.

    PubMed

    Eglezos, Sofroni; Dykes, Gary A

    2018-05-01

    A cheese processing facility seeking to reduce environmental Listeria colonization initiated a regime of ozonation across all production areas as an adjunct to its sanitation regimes. A total of 360 environmental samples from the facility were tested for Listeria over a 12-month period. A total of 15 areas before and 15 areas after ozonation were tested. Listeria isolations were significantly ( P < 0.001) reduced from 15.0% in the preozonation samples to 1.67% in the postozonation samples in all areas. No deleterious effects of ozonation were noted on the wall paneling, seals, synthetic floors, or cheese processing equipment. The ozonation regime was readily incorporated by sanitation staff into the existing good manufacturing practice program. The application of ozone may result in a significant reduction in the prevalence of Listeria in food processing facilities.

  20. 78 FR 18418 - Notice of Application for Special Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Application for Special Permits AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: List of Applications for Special Permits. SUMMARY: In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's...

  1. Containerless Processing Studies in the MSFC Electrostatic Levitator

    NASA Technical Reports Server (NTRS)

    Rogers, J. R.; SanSoucie, M. P.

    2012-01-01

    Levitation or containerless processing represents an important tool in materials research. Levitated specimens are free from contact with a container, which permits studies of deeply undercooled melts, and high-temperature, highly reactive materials. Containerless processing provides data for studies of thermophysical properties, phase equilibria, metastable state formation, microstructure formation, undercooling, and nucleation. Levitation techniques include: acoustic, aero-acoustic, electromagnetic, and electrostatic. In microgravity, levitation can be achieved with greatly reduced positioning forces. Microgravity also reduces the effects of buoyancy and sedimentation in melts. The European Space Agency (ESA) and the German Aerospace Center (DLR) jointly developed an electromagnetic levitator facility (MSL-EML) for containerless materials processing in space. The MSL-EML will be accommodated in the European Columbus Facility on the International Space Station (ISS). The electrostatic levitator (ESL) facility at the Marshall Space Flight Center provides support for the development of containerless processing studies for the ISS. The capabilities of the facility and recent results will be discussed.

  2. Evaluation of the antipsychotic medication review process at four long-term facilities in Alberta.

    PubMed

    Birney, Arden; Charland, Paola; Cole, Mollie; Aslam Arain, Mubashir

    2016-01-01

    The goal of this evaluation was to understand how four long-term care (LTC) facilities in Alberta have implemented medication reviews for the Appropriate Use of Antipsychotics (AUA) initiative. We aimed to determine how interprofessional (IP) collaboration was incorporated in the antipsychotic medication reviews and how the reviews had been sustained. Four LTC facilities in Alberta participated in this evaluation. We conducted semistructured interviews with 18 facility staff and observed one antipsychotic medication review at each facility. We analyzed data according to the following key components that we identified as relevant to the antipsychotic medication reviews: the structure of the reviews, IP interactions between the staff members, and strategies for sustaining the reviews. The duration of antipsychotic medication reviews ranged from 1 to 1.5 hours. The number of professions in attendance ranged from 3 to 9; a pharmacist led the review at two sites, while a registered nurse led the review at one site and a nurse practitioner at the remaining site. The number of residents discussed during the review ranged from 6 to 20. The process at some facilities was highly IP, demonstrating each of the six IP competencies. Other facilities conducted the review in a less IP manner due to challenges of physician involvement and staff workload, particularly of health care aides. Facilities that had an nurse practitioner on site were more efficient with the process of implementing recommendations resulting from the medication reviews. The LTC facilities were successful in implementing the medication review process and the process seemed to be sustainable. A few challenges were observed in the implementation process at two facilities. IP practice moved forward the goals of the AUA initiative to reduce the inappropriate use of antipsychotics.

  3. Dialysis Facility Safety: Processes and Opportunities.

    PubMed

    Garrick, Renee; Morey, Rishikesh

    2015-01-01

    Unintentional human errors are the source of most safety breaches in complex, high-risk environments. The environment of dialysis care is extremely complex. Dialysis patients have unique and changing physiology, and the processes required for their routine care involve numerous open-ended interfaces between providers and an assortment of technologically advanced equipment. Communication errors, both within the dialysis facility and during care transitions, and lapses in compliance with policies and procedures are frequent areas of safety risk. Some events, such as air emboli and needle dislodgments occur infrequently, but are serious risks. Other adverse events include medication errors, patient falls, catheter and access-related infections, access infiltrations and prolonged bleeding. A robust safety system should evaluate how multiple, sequential errors might align to cause harm. Systems of care can be improved by sharing the results of root cause analyses, and "good catches." Failure mode effects and analyses can be used to proactively identify and mitigate areas of highest risk, and methods drawn from cognitive psychology, simulation training, and human factor engineering can be used to advance facility safety. © 2015 Wiley Periodicals, Inc.

  4. 78 FR 4162 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...: Greenville Zoo, Greenville, SC; PRT-92474A The applicant requests a captive-bred wildlife registration under.... Applicant: Honolulu Zoo, Honolulu, HI; PRT-94141A The applicant requests a permit authorizing interstate and... captive-bred facility in Honolulu, Hawaii to Africam Zoo in Puebla, Mexico for the purpose of enhancement...

  5. 49 CFR 655.73 - Access to facilities and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Access to facilities and records. 655.73 Section... OPERATIONS Administrative Requirements § 655.73 Access to facilities and records. (a) Except as required by... payment for the production of those records. (c) An employer shall permit access to all facilities...

  6. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media view the high bay inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida. Kerry Chreist, with Jacobs Engineering on the Test and Operations Support Contract, talks with a reporter about the booster segments for NASA’s Space Launch System (SLS) rocket. In the far corner, in the vertical position, is one of two pathfinders, or test versions, of solid rocket booster segments for the SLS rocket. The Ground Systems Development and Operations Program and Jacobs are preparing the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  7. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida, members of the news media photograph a frustrum that will be stacked atop a forward skirt for one of NASA’s Space Launch System (SLS) solid rocket boosters. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS solid rocket boosters. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft on deep-space missions and the journey to Mars.

  8. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida, Jeff Cook, a thermal protection system specialist with Orbital ATK, displays a sample of the painted thermal protection system that is being applied to booster segments. Members of the news media toured the BFF. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS rocket boosters. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  9. NPDES Permit for Devon Energy Production Company – Riverton Dome in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000671, Devon Energy Production Company, L.P. – Riverton Dome is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to the Little Wind River via unnamed draw.

  10. Process control and dosimetry in a multipurpose irradiation facility

    NASA Astrophysics Data System (ADS)

    Cabalfin, E. G.; Lanuza, L. G.; Solomon, H. M.

    1999-08-01

    Availability of the multipurpose irradiation facility at the Philippine Nuclear Research Institute has encouraged several local industries to use gamma radiation for sterilization or decontamination of various products. Prior to routine processing, dose distribution studies are undertaken for each product and product geometry. During routine irradiation, dosimeters are placed at the minimum and maximum dose positions of a process load.

  11. 77 FR 76479 - Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9765-4] Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State Operating Permit for U.S. Steel-- Granite City Works, Granite... Protection Agency (IEPA) for the U.S. Steel--Granite City Works (USGW) facility, located in Granite City...

  12. NPDES Draft Permit for Standing Rock Rural Water System in South Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit SD-0030996, the Standing Rock Rural Water System is authorized to discharge from its wastewater treatment facility in Corson County, South Dakota, to an unnamed tributary to Oahe Reservoir on the Missouri River.

  13. 77 FR 4813 - Proposed Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... the conditions of the Beaufort general permit are stringent enough to comply with State water quality... conditions than what is proposed in the Beaufort general permit to ensure compliance with State water quality... Clean Water Act (CWA or ``the Act''), 33 U.S.C. 1342. State Certification of Beaufort General Permit...

  14. NPDES Permit for Thunder Butte Petroleum Services Inc. Refinery in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND-003098, the Thunder Butte Petroleum Services Inc. refinery is authorized to discharge from its wastewater treatment facilities near Makoti in Ward County, North Dakota, to wetlands tributary to the East Fork of Shell Creek.

  15. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 1. 205.328 Section 205.328 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...

  16. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 2. 205.329 Section 205.329 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...

  17. Facility Search Help | ECHO | US EPA

    EPA Pesticide Factsheets

    Search for compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  18. EPA Facility Registry Service (FRS): Facility Interests Dataset Download

    EPA Pesticide Factsheets

    This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers

  19. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  20. NPDES Permit for Phoenix Production Company – Rolff Lake Unit in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-002494, Phoenix Production Company is authorized to discharge from its Rolff Lake Unit wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.

  1. NPDES Permit for Phoenix Production Company – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0024953, Phoenix Production Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.

  2. NPDES Permit for Eastern Colorado Health Care System (VA Hospital) in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034991, the U.S. Department of Veterans Affairs (VA) is authorized to discharge from its wastewater treatment facility in Adams County, Colorado, to a storm sewer to Toll Gate Creek, a tributary of Sand Creek.

  3. NPDES Permit for \\tWashington Metropolitan Area Transit Authority (WMATA) Mississippi Avenue Pumping Station

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000337, the Washington Metropolitan Area Transit Authority (WMATA) is authorized to dischargefrom a facility to receiving waters named Oxon Run.

  4. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida, members of the news media view a forward skirt that will be used on a solid rocket booster for NASA’s Space Launch System (SLS) rocket. Orbital ATK is a contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS solid rocket boosters. Rick Serfozo, Orbital ATK Florida site director, talks to the media. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  5. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media view the high bay inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida. Kerry Chreist, with Jacobs Engineering on the Test and Operations Support Contract, explains the various test stands and how they will be used to prepare booster segments for NASA’s Space Launch System (SLS) rocket. In the far corner, in the vertical position, is one of two pathfinders, or test versions, of solid rocket booster segments for the SLS rocket. The Ground Systems Development and Operations Program and Jacobs are preparing the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  6. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Members of the news media watch as two cranes are used to lift one of two pathfinders, or test versions, of solid rocket booster segments for NASA’s Space Launch System (SLS) rocket into the vertical position inside the Rotation, Processing and Surge Facility at NASA’s Kennedy Space Center in Florida. The pathfinder booster segment will be moved to the other end of the RPSF and secured on a test stand. The Ground Systems Development and Operations Program and Jacobs Engineering, on the Test and Operations Support Contract, will prepare the booster segments, which are inert, for a series of lifts, moves and stacking operations to prepare for Exploration Mission-1, deep-space missions and the journey to Mars.

  7. AQUIS: A PC-based air inventory and permit manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, A.E.; Huber, C.C.; Tschanz, J.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track sources, emissions, stacks, permits, and related information. The system runs on IBM-compatible personal computers with dBASE IV and tracks more than 1,200 data items distributed among various source categories. AQUIS is currently operating at nine US Air Force facilities that have up to 1,000 sources. The system provides a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing user-specified information. In addition to six criteria pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emissionmore » estimates.« less

  8. Recycled water reuse permit renewal application for the materials and fuels complex industrial waste ditch and industrial waste pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Name, No

    This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in themore » initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.« less

  9. NPDES Permit for Wesco Operating, Inc. – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0025607, Wesco Operating, Inc. is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Dry (Pasup) Creek, which is tributary to the Wind River.

  10. NPDES Permit for Wesco Operating, Inc. – Winkleman Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0025232, Wesco Operating, Inc. is authorized to discharge from its Winkleman Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Big Horn Draw, a tributary to the Little Wind River.

  11. EPA Facility Registry Service (FRS): Facility Interests Dataset

    EPA Pesticide Factsheets

    This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz

  12. Overview of NORM and activities by a NORM licensed permanent decontamination and waste processing facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mirro, G.A.

    1997-02-01

    This paper presents an overview of issues related to handling NORM materials, and provides a description of a facility designed for the processing of NORM contaminated equipment. With regard to handling NORM materials the author discusses sources of NORM, problems, regulations and disposal options, potential hazards, safety equipment, and issues related to personnel protection. For the facility, the author discusses: description of the permanent facility; the operations of the facility; the license it has for handling specific radioactive material; operating and safety procedures; decontamination facilities on site; NORM waste processing capabilities; and offsite NORM services which are available.

  13. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamolla, Meritxell Martell

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. Thismore » paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)« less

  14. Deficient Permit Notification Notice For Lake County Waste to Energy Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Impact of Salt Waste Processing Facility Streams on the Nitric-Glycolic Flowsheet in the Chemical Processing Cell

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martino, C.

    An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components,more » antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).« less

  16. Technology Readiness Assessment of Department of Energy Waste Processing Facilities

    DTIC Science & Technology

    2007-09-11

    Must Be Reliable, Robust, Flexible, and Durable 6 EM Is Piloting the TRA/AD2 Process Hanford Waste Treatment Plant ( WTP ) – The Initial Pilot Project...Evaluation WTP can only treat ~ ½ of the LAW in the time it will take to treat all the HLW. • There is a need for tank space that will get more urgent with...Facility before the WTP Pretreatment and High-Level Waste (HLW) Vitrification Facilities are available (Requires tank farm pretreatment capability) TRAs

  17. Facility siting as a decision process at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wike, L.D.

    1995-12-31

    Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating amore » facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts.« less

  18. 78 FR 70042 - Proposed Issuance of the NPDES General Permit for Oil and Gas Geotechnical Surveying and Related...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of the Beaufort... (NPDES) General Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of... authorizes twelve types of discharges from facilities engaged in oil and gas geotechnical surveys to evaluate...

  19. SRB Processing Facilities Media Event

    NASA Image and Video Library

    2016-03-01

    Inside the Booster Fabrication Facility (BFF) at NASA’s Kennedy Space Center in Florida, members of the news media view the right-hand aft skirt that will be used on a solid rocket booster for NASA’s Space Launch System (SLS) rocket. Orbital ATK is contractor for NASA’s Marshall Space Flight Center in Alabama, and operates the BFF to prepare aft booster segments and hardware for the SLS solid rocket boosters. At far right, in the royal blue shirt, Rick Serfozo, Orbital ATK Florida site director, talks to the media. The SLS rocket and Orion spacecraft will launch on Exploration Mission-1 in 2018. The Ground Systems Development and Operations Program is preparing the infrastructure to process and launch spacecraft for deep-space missions and the journey to Mars.

  20. EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet Download

    EPA Pesticide Factsheets

    This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers

  1. Permit Fees

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  2. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  3. Materials, Processes, and Facile Manufacturing for Bioresorbable Electronics: A Review.

    PubMed

    Yu, Xiaowei; Shou, Wan; Mahajan, Bikram K; Huang, Xian; Pan, Heng

    2018-05-07

    Bioresorbable electronics refer to a new class of advanced electronics that can completely dissolve or disintegrate with environmentally and biologically benign byproducts in water and biofluids. They have provided a solution to the growing electronic waste problem with applications in temporary usage of electronics such as implantable devices and environmental sensors. Bioresorbable materials such as biodegradable polymers, dissolvable conductors, semiconductors, and dielectrics are extensively studied, enabling massive progress of bioresorbable electronic devices. Processing and patterning of these materials are predominantly relying on vacuum-based fabrication methods so far. However, for the purpose of commercialization, nonvacuum, low-cost, and facile manufacturing/printing approaches are the need of the hour. Bioresorbable electronic materials are generally more chemically reactive than conventional electronic materials, which require particular attention in developing the low-cost manufacturing processes in ambient environment. This review focuses on material reactivity, ink availability, printability, and process compatibility for facile manufacturing of bioresorbable electronics. © 2018 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  4. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  5. NPDES Draft Permit for City of New Town Water Treatment Plant in North Dakota

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System draft permit number ND0031151, The City of New Town Water Treatment Plant is authorized to discharge from its wastewater treatment facility in Mountrail County, North Dakota.

  6. Spacelab Data Processing Facility (SLDPF) quality assurance expert systems development

    NASA Technical Reports Server (NTRS)

    Basile, Lisa R.; Kelly, Angelita C.

    1987-01-01

    The Spacelab Data Processing Facility (SLDPF) is an integral part of the Space Shuttle data network for missions that involve attached scientific payloads. Expert system prototypes were developed to aid in the performance of the quality assurance function of the Spacelab and/or Attached Shuttle Payloads processed telemetry data. The Spacelab Input Processing System (SIPS) and the Spacelab Output Processing System (SOPS), two expert systems, were developed to determine their feasibility and potential in the quality assurance of processed telemetry data. The capabilities and performance of these systems are discussed.

  7. Facility Search Results | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  8. Facility Search - Water | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  9. Facility Search - Air | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  10. Detailed Facility Report | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  11. 2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael G. Lewis

    2012-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Areamore » Sewage Treatment plant.« less

  12. EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet

    EPA Pesticide Factsheets

    This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz

  13. Evaluation of mercury in the liquid waste processing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jain, Vijay; Shah, Hasmukh; Occhipinti, John E.

    2015-08-13

    This report provides a summary of Phase I activities conducted to support an Integrated Evaluation of Mercury in Liquid Waste System (LWS) Processing Facilities. Phase I activities included a review and assessment of the liquid waste inventory and chemical processing behavior of mercury using a system by system review methodology approach. Gaps in understanding mercury behavior as well as action items from the structured reviews are being tracked. 64% of the gaps and actions have been resolved.

  14. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  15. Cutting the Cost of New Community College Facilities: Streamlining the Facilities Approval Process. Commission on Innovation Policy Discussion Paper Number 3.

    ERIC Educational Resources Information Center

    BW Associates, Berkeley, CA.

    Intended to provide background information and preliminary options for the California Community Colleges' Commission on Innovation, this document proposes that approval processes for new facilities be simplified and that restrictions on the lease or purchase of off-campus facilities be eased. Following introductory materials detailing the…

  16. Building Information Modeling (BIM) Primer. Report 1: Facility Life-Cycle Process and Technology Innovation

    DTIC Science & Technology

    2012-08-01

    Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a

  17. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Protection Agency. ACTION: Notice of Final NPDES General Permit. SUMMARY: The Director of the Water Quality... Extraction Point Source Category as authorized by section 402 of the Clean Water Act, 33 U.S.C. 1342 (CWA... change to the proposed permit. A copy of the Region's responses to comments and the final permit may be...

  18. University of Maryland MRSEC - Facilities: SEM/STM/AFM

    Science.gov Websites

    MRSEC Templates Opportunities Search Home » Facilities » SEM/STM/AFM Shared Experimental Facilities conducting and non conducting samples. The sample stage permits electronic device imaging under operational Specifications: Image Modes - STM, STS, MFM, EFM, SKPM, contact- and non-contact AFM Three Sample Contacts 0.1 nm

  19. 77 FR 123 - Final Reissuance of General NPDES Permits (GP) for Facilities Related to Oil and Gas Extraction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  20. 78 FR 17661 - Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  1. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  2. Unity connecting module in the Space Station Processing Facility

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Unity connecting module, part of the International Space Station, awaits processing in the Space Station Processing Facility (SSPF). On the end at the right can be seen the Pressurized Mating Adapter 2, which provides entry into the module. The Unity, scheduled to be launched on STS-88 in December 1998, will be mated to the Russian-built Zarya control module which will already be in orbit. STS-88 will be the first Space Shuttle launch for the International Space Station.

  3. AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP627) ADJOINING FUEL PROCESSING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP-627) ADJOINING FUEL PROCESSING BUILDING AND EXCAVATION FOR HOT PILOT PLANT TO RIGHT (CPP-640). INL PHOTO NUMBER NRTS-60-1221. J. Anderson, Photographer, 3/22/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  5. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  6. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  7. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  8. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  9. Petition to Object to Title V Facility Permit Issued to Proposed Orange Recycling and Ethanol Production Facility in the City of Middletown, NY

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Process auditing in long term care facilities.

    PubMed

    Hewitt, S M; LeSage, J; Roberts, K L; Ellor, J R

    1985-01-01

    The ECC tool development and audit experiences indicated that there is promise in developing a process audit tool to monitor quality of care in nursing homes; moreover, the tool selected required only one hour per resident. Focusing on the care process and resident needs provided useful information for care providers at the unit level as well as for administrative personnel. Besides incorporating a more interdisciplinary focus, the revised tool needs to define support services most appropriate for nursing homes, includes items related to discharge planning and increases measurement of significant others' involvement in the care process. Future emphasis at the ECC will focus on developing intervention plans to maintain strengths and correct deficiencies identified in the audits. Various strategies to bring about desired changes in the quality of care will be evaluated through regular, periodic monitoring. Having a valid and reliable measure of quality of care as a tool will be an important step forward for LTC facilities.

  11. How work context affects operating room processes: using data mining and computer simulation to analyze facility and process design.

    PubMed

    Baumgart, André; Denz, Christof; Bender, Hans-Joachim; Schleppers, Alexander

    2009-01-01

    The complexity of the operating room (OR) requires that both structural (eg, department layout) and behavioral (eg, staff interactions) patterns of work be considered when developing quality improvement strategies. In our study, we investigated how these contextual factors influence outpatient OR processes and the quality of care delivered. The study setting was a German university-affiliated hospital performing approximately 6000 outpatient surgeries annually. During the 3-year-study period, the hospital significantly changed its outpatient OR facility layout from a decentralized (ie, ORs in adjacent areas of the building) to a centralized (ie, ORs in immediate vicinity of each other) design. To study the impact of the facility change on OR processes, we used a mixed methods approach, including process analysis, process modeling, and social network analysis of staff interactions. The change in facility layout was seen to influence OR processes in ways that could substantially affect patient outcomes. For example, we found a potential for more errors during handovers in the new centralized design due to greater interdependency between tasks and staff. Utilization of the mixed methods approach in our analysis, as compared with that of a single assessment method, enabled a deeper understanding of the OR work context and its influence on outpatient OR processes.

  12. Oglethorpe Power Company, Wansley Energy Facility; Amended Order Denying Petition for Objection to Permit in Response to Remand

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  13. Simulation of mass storage systems operating in a large data processing facility

    NASA Technical Reports Server (NTRS)

    Holmes, R.

    1972-01-01

    A mass storage simulation program was written to aid system designers in the design of a data processing facility. It acts as a tool for measuring the overall effect on the facility of on-line mass storage systems, and it provides the means of measuring and comparing the performance of competing mass storage systems. The performance of the simulation program is demonstrated.

  14. Bit error rate performance of Image Processing Facility high density tape recorders

    NASA Technical Reports Server (NTRS)

    Heffner, P.

    1981-01-01

    The Image Processing Facility at the NASA/Goddard Space Flight Center uses High Density Tape Recorders (HDTR's) to transfer high volume image data and ancillary information from one system to another. For ancillary information, it is required that very low bit error rates (BER's) accompany the transfers. The facility processes about 10 to the 11th bits of image data per day from many sensors, involving 15 independent processing systems requiring the use of HDTR's. When acquired, the 16 HDTR's offered state-of-the-art performance of 1 x 10 to the -6th BER as specified. The BER requirement was later upgraded in two steps: (1) incorporating data randomizing circuitry to yield a BER of 2 x 10 to the -7th and (2) further modifying to include a bit error correction capability to attain a BER of 2 x 10 to the -9th. The total improvement factor was 500 to 1. Attention is given here to the background, technical approach, and final results of these modifications. Also discussed are the format of the data recorded by the HDTR, the magnetic tape format, the magnetic tape dropout characteristics as experienced in the Image Processing Facility, the head life history, and the reliability of the HDTR's.

  15. Emissions model of waste treatment operations at the Idaho Chemical Processing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schindler, R.E.

    1995-03-01

    An integrated model of the waste treatment systems at the Idaho Chemical Processing Plant (ICPP) was developed using a commercially-available process simulation software (ASPEN Plus) to calculate atmospheric emissions of hazardous chemicals for use in an application for an environmental permit to operate (PTO). The processes covered by the model are the Process Equipment Waste evaporator, High Level Liquid Waste evaporator, New Waste Calcining Facility and Liquid Effluent Treatment and Disposal facility. The processes are described along with the model and its assumptions. The model calculates emissions of NO{sub x}, CO, volatile acids, hazardous metals, and organic chemicals. Some calculatedmore » relative emissions are summarized and insights on building simulations are discussed.« less

  16. 78 FR 51818 - Notice of Applications for Modification of Special Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... Applications for Modification of Special Permits AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: List of applications for modification of special permits SUMMARY: In accordance with the procedures governing the application for, and the processing of, special permits from the...

  17. Process cost and facility considerations in the selection of primary cell culture clarification technology.

    PubMed

    Felo, Michael; Christensen, Brandon; Higgins, John

    2013-01-01

    The bioreactor volume delineating the selection of primary clarification technology is not always easily defined. Development of a commercial scale process for the manufacture of therapeutic proteins requires scale-up from a few liters to thousands of liters. While the separation techniques used for protein purification are largely conserved across scales, the separation techniques for primary cell culture clarification vary with scale. Process models were developed to compare monoclonal antibody production costs using two cell culture clarification technologies. One process model was created for cell culture clarification by disc stack centrifugation with depth filtration. A second process model was created for clarification by multi-stage depth filtration. Analyses were performed to examine the influence of bioreactor volume, product titer, depth filter capacity, and facility utilization on overall operating costs. At bioreactor volumes <1,000 L, clarification using multi-stage depth filtration offers cost savings compared to clarification using centrifugation. For bioreactor volumes >5,000 L, clarification using centrifugation followed by depth filtration offers significant cost savings. For bioreactor volumes of ∼ 2,000 L, clarification costs are similar between depth filtration and centrifugation. At this scale, factors including facility utilization, available capital, ease of process development, implementation timelines, and process performance characterization play an important role in clarification technology selection. In the case study presented, a multi-product facility selected multi-stage depth filtration for cell culture clarification at the 500 and 2,000 L scales of operation. Facility implementation timelines, process development activities, equipment commissioning and validation, scale-up effects, and process robustness are examined. © 2013 American Institute of Chemical Engineers.

  18. PROCESS AND EQUIPMENT CHANGES FOR CLEANER PRODUCTION IN FEDERAL FACILITIES

    EPA Science Inventory

    The paper discusses process and equipment changes for cleaner production in federal facilities. During the 1990s, DoD and EPA conducted joint research and development, aimed at reducing the discharge of hazardous and toxic pollutants from military production and maintenance faci...

  19. Sources and potential application of waste heat utilization at a gas processing facility

    NASA Astrophysics Data System (ADS)

    Alshehhi, Alyas Ali

    Waste heat recovery (WHR) has the potential to significantly improve the efficiency of oil and gas plants, chemical and other processing facilities, and reduce their environmental impact. In this Thesis a comprehensive energy audit at Abu Dhabi Gas Industries Ltd. (GASCO) ASAB gas processing facilities is undertaken to identify sources of waste heat and evaluate their potential for on-site recovery. Two plants are considered, namely ASAB0 and ASAB1. Waste heat evaluation criteria include waste heat grade (i.e., temperature), rate, accessibility (i.e., proximity) to potential on-site waste heat recovery applications, and potential impact of recovery on installation performance and safety. The operating parameters of key waste heat source producing equipment are compiled, as well as characteristics of the waste heat streams. In addition, potential waste heat recovery applications and strategies are proposed, focusing on utilities, i.e., enhancement of process cooling/heating, electrical/mechanical power generation, and steam production. The sources of waste heat identified at ASAB facilities consist of gas turbine and gas generator exhaust gases, flared gases, excess propane cooling capacity, excess process steam, process gas air-cooler heat dissipation, furnace exhaust gases and steam turbine outlet steam. Of the above waste heat sources, exhaust gases from five gas turbines and one gas generator at ASAB0 plant, as well as from four gas turbines at ASAB1 plant, were found to meet the rate (i.e., > 1 MW), grade (i.e., > 180°C), accessibility (i.e., < 50 m from potential on-site WHR applications) and minimal impact criteria on the performance and safety of existing installations, for potential waste heat recovery. The total amount of waste heat meeting these criteria were estimated at 256 MW and 289 MW at ASAB0 and ASAB1 plants, respectively, both of which are substantial. Of the 289 MW waste generated at ASAB1, approximately 173 MW are recovered by waste heat

  20. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  1. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  2. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  3. WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS

    EPA Science Inventory

    The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...

  4. Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.

    PubMed

    Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M

    2018-03-06

    We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.

  5. NPDES Permit for Eagle Oil and Gas Company – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0020338, the Eagle Oil and Gas Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, a tributary to the Wind River.

  6. 77 FR 65547 - Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9747-5] Reissuance of the NPDES General Permits for Oil and... Sea and on the Outer Continental Shelf in the Chukchi Sea, AK AGENCY: Environmental Protection Agency... draft general permits were also published in the Anchorage Daily News, the Arctic Sounder, and Petroleum...

  7. Facility Search - Drinking Water | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  8. Facility Search - All Data | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  9. Facility Search - Hazardous Waste | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  10. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  11. 41 CFR 102-74.270 - Are vehicles required to display parking permits in parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vehicles required to... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.270 Are vehicles required...

  12. STS-34 Galileo processing at KSC's SAEF-2 planetary spacecraft facility

    NASA Image and Video Library

    1989-07-21

    At the Kennedy Space Center's (KSC's) Spacecraft and Assembly Encapsulation Facility 2 (SAEF-2), the planetary spacecraft checkout facility, clean-suited technicians work on the Galileo spacecraft prior to moving it to the Vehicle Processing Facility (VPF) for mating with the inertial upper stage (IUS). Galileo is scheduled for launch aboard Atlantis, Orbiter Vehicle (OV) 104, on Space Shuttle Mission STS-34 in October 1989. It will be sent to the planet Jupiter, a journey which will taken more than six years to complete. In December 1995 as the two and one half ton spacecraft orbits Jupiter with its ten scientific instruments, a probe will be released to parachute into the Jovian atmosphere. NASA's Jet Propulsion Laboratory (JPL) manages the Galileo project. View provided by KSC.

  13. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less

  14. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  15. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... be included in the Acid Rain permit. (b) Scope. The opt-in permit provisions shall apply only to the... provision that participation of a combustion or process source in the Acid Rain Program may be terminated... deemed to be operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6) of...

  16. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be included in the Acid Rain permit. (b) Scope. The opt-in permit provisions shall apply only to the... provision that participation of a combustion or process source in the Acid Rain Program may be terminated... deemed to be operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6) of...

  17. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be included in the Acid Rain permit. (b) Scope. The opt-in permit provisions shall apply only to the... provision that participation of a combustion or process source in the Acid Rain Program may be terminated... deemed to be operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6) of...

  18. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be included in the Acid Rain permit. (b) Scope. The opt-in permit provisions shall apply only to the... provision that participation of a combustion or process source in the Acid Rain Program may be terminated... deemed to be operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6) of...

  19. 28 CFR 540.41 - Visiting facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Visiting facilities. 540.41 Section 540.41 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT CONTACT... visitors. (a) Institutions of minimum and low security levels may permit visits beyond the security...

  20. Fire Hazard Assessment in Supporting Fire Protection System Design of a Chemical Process Facility

    DTIC Science & Technology

    1996-08-01

    CSDP/Studies/FireHaz –i– 3/28/97 FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY Ali Pezeshk...Joseph Chang, Dwight Hunt, and Peter Jahn Parsons Infrastructure & Technology Group, Inc. Pasadena, California 91124 ABSTRACT Because fires in a chemical ...Assessment in Supporting Fire Protection System Design of a Chemical Process Facility 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6

  1. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  2. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  3. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  4. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  5. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  6. Distributed intelligent monitoring and reporting facilities

    NASA Astrophysics Data System (ADS)

    Pavlou, George; Mykoniatis, George; Sanchez-P, Jorge-A.

    1996-06-01

    Distributed intelligent monitoring and reporting facilities are of paramount importance in both service and network management as they provide the capability to monitor quality of service and utilization parameters and notify degradation so that corrective action can be taken. By intelligent, we refer to the capability of performing the monitoring tasks in a way that has the smallest possible impact on the managed network, facilitates the observation and summarization of information according to a number of criteria and in its most advanced form and permits the specification of these criteria dynamically to suit the particular policy in hand. In addition, intelligent monitoring facilities should minimize the design and implementation effort involved in such activities. The ISO/ITU Metric, Summarization and Performance management functions provide models that only partially satisfy the above requirements. This paper describes our extensions to the proposed models to support further capabilities, with the intention to eventually lead to fully dynamically defined monitoring policies. The concept of distributing intelligence is also discussed, including the consideration of security issues and the applicability of the model in ODP-based distributed processing environments.

  7. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  8. Shingle Springs Band of Miwok Indians/Shingle Springs Rancheria: Express Fuel General Air Quality Permit Application

    EPA Pesticide Factsheets

    Shingle Springs Rancheria/Shingle Springs Band of Miwok Indians/Express Fuel Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Gasoline Dispensing Facilities in Indian Country within California.

  9. Preliminary technical data summary No. 3 for the Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, L.F.

    1980-05-01

    This document presents an update on the best information presently available for the purpose of establishing the basis for the design of a Defense Waste Processing Facility. Objective of this project is to provide a facility to fix the radionuclides present in Savannah River Plant (SRP) high-level liquid waste in a high-integrity form (glass). Flowsheets and material balances reflect the alternate CAB case including the incorporation of low-level supernate in concrete. (DLC)

  10. Establishing a cGMP pancreatic islet processing facility: the first experience in Iran.

    PubMed

    Larijani, Bagher; Arjmand, Babak; Amoli, Mahsa M; Ao, Ziliang; Jafarian, Ali; Mahdavi-Mazdah, Mitra; Ghanaati, Hossein; Baradar-Jalili, Reza; Sharghi, Sasan; Norouzi-Javidan, Abbas; Aghayan, Hamid Reza

    2012-12-01

    It has been predicted that one of the greatest increase in prevalence of diabetes will happen in the Middle East bear in the next decades. The aim of standard therapeutic strategies for diabetes is better control of complications. In contrast, some new strategies like cell and gene therapy have aimed to cure the disease. In recent years, significant progress has occurred in beta-cell replacement therapies with a progressive improvement of short-term and long term outcomes. In year 2005, considering the impact of the disease in Iran and the promising results of the Edmonton protocol, the funding for establishing a current Good Manufacturing Practice (cGMP) islet processing facility by Endocrinology and Metabolism Research Center was approved by Tehran University of Medical Sciences. Several islet isolations were performed following establishment of cGMP facility and recruitment of all required equipments for process validation and experimental purpose. Finally the first successful clinical islet isolation and transplantation was performed in September 2010. In spite of a high cost of the procedure it is considered beneficial and may prevent long term complications and the costs associated with secondary cares. In this article we will briefly describe our experience in setting up a cGMP islet processing facility which can provide valuable information for regional countries interested to establish similar facilities.

  11. Robot Serviced Space Facility

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R. (Inventor)

    1992-01-01

    A robot serviced space facility includes multiple modules which are identical in physical structure, but selectively differing in function. and purpose. Each module includes multiple like attachment points which are identically placed on each module so as to permit interconnection with immediately adjacent modules. Connection is made through like outwardly extending flange assemblies having identical male and female configurations for interconnecting to and locking to a complementary side of another flange. Multiple rows of interconnected modules permit force, fluid, data and power transfer to be accomplished by redundant circuit paths. Redundant modules of critical subsystems are included. Redundancy of modules and of interconnections results in a space complex with any module being removable upon demand, either for module replacement or facility reconfiguration. without eliminating any vital functions of the complex. Module replacement and facility assembly or reconfiguration are accomplished by a computer controlled articulated walker type robotic manipulator arm assembly having two identical end-effectors in the form of male configurations which are identical to those on module flanges and which interconnect to female configurations on other flanges. The robotic arm assembly moves along a connected set or modules by successively disconnecting, moving and reconnecting alternate ends of itself to a succession of flanges in a walking type maneuver. To transport a module, the robot keeps the transported module attached to one of its end-effectors and uses another flange male configuration of the attached module as a substitute end-effector during walking.

  12. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  13. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  14. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  15. Is a Solvent Reclamation Facility Considered a Chemical Process Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. Facility Search – Enforcement and Compliance Data | ECHO ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  17. 18 CFR 157.21 - Pre-filing procedures and review process for LNG terminal facilities and other natural gas...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the pre-filing review of any pipeline or other natural gas facilities, including facilities not... from the subject LNG terminal facilities to the existing natural gas pipeline infrastructure. (b) Other... and review process for LNG terminal facilities and other natural gas facilities prior to filing of...

  18. {open_quotes}In close proximity{close_quotes} to E&P waste management facilities: Lessons of three communities in the Four Corners Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shuey, C.

    1994-12-31

    Contaminant releases from E&P waste management facilities located near residences in three communities in the Four Corners Area -- two in New Mexico and one in Utah -- spurred vocal concern among local residents in recent years. Noxious odors, including hydrogen sulfide, were present in all cases and releases of production wastes and oil spills were prevalent in two of the cases. In all three, residents said they felt powerless to change operator or agency decisions about siting of facilities close to places where people congregate. These cases illustrate the need for regulators to consider facility locations in permitting decisions.more » They also demonstrate the need for creation of statutorily recognized buffer zones around new oil and gas production and processing facilities where releases of pollutants to the air, land and water can reasonably be expected, regardless of the level of pollution control. Buffer zones may be especially important in states where local governments have not elected to adopt land use and zoning requirements that affect the siting of E&P facilities. Agency and corporate sensitivity to siting concerns will engender public confidence in permitting decisions and avoid the needless waste of public and private resources.« less

  19. Defense Waste Processing Facility Nitric- Glycolic Flowsheet Chemical Process Cell Chemistry: Part 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zamecnik, J.; Edwards, T.

    The conversions of nitrite to nitrate, the destruction of glycolate, and the conversion of glycolate to formate and oxalate were modeled for the Nitric-Glycolic flowsheet using data from Chemical Process Cell (CPC) simulant runs conducted by Savannah River National Laboratory (SRNL) from 2011 to 2016. The goal of this work was to develop empirical correlation models to predict these values from measureable variables from the chemical process so that these quantities could be predicted a-priori from the sludge or simulant composition and measurable processing variables. The need for these predictions arises from the need to predict the REDuction/OXidation (REDOX) statemore » of the glass from the Defense Waste Processing Facility (DWPF) melter. This report summarizes the work on these correlations based on the aforementioned data. Previous work on these correlations was documented in a technical report covering data from 2011-2015. This current report supersedes this previous report. Further refinement of the models as additional data are collected is recommended.« less

  20. DOE Coal Gasification Multi-Test Facility: fossil fuel processing technical/professional services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hefferan, J.K.; Lee, G.Y.; Boesch, L.P.

    1979-07-13

    A conceptual design, including process descriptions, heat and material balances, process flow diagrams, utility requirements, schedule, capital and operating cost estimate, and alternative design considerations, is presented for the DOE Coal Gasification Multi-Test Facility (GMTF). The GMTF, an engineering scale facility, is to provide a complete plant into which different types of gasifiers and conversion/synthesis equipment can be readily integrated for testing in an operational environment at relatively low cost. The design allows for operation of several gasifiers simultaneously at a total coal throughput of 2500 tons/day; individual gasifiers operate at up to 1200 tons/day and 600 psig using airmore » or oxygen. Ten different test gasifiers can be in place at the facility, but only three can be operated at one time. The GMTF can produce a spectrum of saleable products, including low Btu, synthesis and pipeline gases, hydrogen (for fuel cells or hydrogasification), methanol, gasoline, diesel and fuel oils, organic chemicals, and electrical power (potentially). In 1979 dollars, the base facility requires a $288 million capital investment for common-use units, $193 million for four gasification units and four synthesis units, and $305 million for six years of operation. Critical reviews of detailed vendor designs are appended for a methanol synthesis unit, three entrained flow gasifiers, a fluidized bed gasifier, and a hydrogasifier/slag-bath gasifier.« less

  1. Downgrading Nuclear Facilities to Radiological Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarry, Jeffrey F.; Farr, Jesse Oscar; Duran, Leroy

    2015-08-01

    Based on inventory reductions and the use of alternate storage facilities, the Sandia National Laboratories (SNL) downgraded 4 SNL Hazard Category 3 (HC-3) nuclear facilities to less-than-HC-3 radiological facilities. SNL’s Waste Management and Pollution Prevention Department (WMPPD) managed the HC-3 nuclear facilities and implemented the downgrade. This paper will examine the downgrade process,

  2. Community outreach at biomedical research facilities.

    PubMed

    Goldman, M; Hedetniemi, J N; Herbert, E R; Sassaman, J S; Walker, B C

    2000-12-01

    For biomedical researchers to fulfill their responsibility for protecting the environment, they must do more than meet the scientific challenge of reducing the number and volume of hazardous materials used in their laboratories and the engineering challenge of reducing pollution and shifting to cleaner energy sources. They must also meet the public relations challenge of informing and involving their neighbors in these efforts. The experience of the Office of Community Liaison of the National Institutes of Health (NIH) in meeting the latter challenge offers a model and several valuable lessons for other biomedical research facilities to follow. This paper is based on presentations by an expert panel during the Leadership Conference on Biomedical Research and the Environment held 1--2 November 1999 at NIH, Bethesda, Maryland. The risks perceived by community members are often quite different from those identified by officials at the biomedical research facility. The best antidote for misconceptions is more and better information. If community organizations are to be informed participants in the decision-making process, they need a simple but robust mechanism for identifying and evaluating the environmental hazards in their community. Local government can and should be an active and fully informed partner in planning and emergency preparedness. In some cases this can reduce the regulatory burden on the biomedical research facility. In other cases it might simplify and expedite the permitting process or help the facility disseminate reliable information to the community. When a particular risk, real or perceived, is of special concern to the community, community members should be involved in the design, implementation, and evaluation of targeted risk assessment activities. Only by doing so will the community have confidence in the results of those activities. NIH has involved community members in joint efforts to deal with topics as varied as recycling and soil

  3. 40 CFR 372.20 - Process for modifying covered chemicals and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... chemicals and facilities. 372.20 Section 372.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS TOXIC CHEMICAL RELEASE REPORTING: COMMUNITY RIGHT-TO-KNOW Reporting Requirements § 372.20 Process for modifying covered chemicals...

  4. 10 CFR 70.64 - Requirements for new facilities or new processes at existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... behavior of items relied on for safety. (b) Facility and system design and facility layout must be based on... existing facilities. (a) Baseline design criteria. Each prospective applicant or licensee shall address the following baseline design criteria in the design of new facilities. Each existing licensee shall address the...

  5. 10 CFR 70.64 - Requirements for new facilities or new processes at existing facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... behavior of items relied on for safety. (b) Facility and system design and facility layout must be based on... existing facilities. (a) Baseline design criteria. Each prospective applicant or licensee shall address the following baseline design criteria in the design of new facilities. Each existing licensee shall address the...

  6. 10 CFR 70.64 - Requirements for new facilities or new processes at existing facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... behavior of items relied on for safety. (b) Facility and system design and facility layout must be based on... existing facilities. (a) Baseline design criteria. Each prospective applicant or licensee shall address the following baseline design criteria in the design of new facilities. Each existing licensee shall address the...

  7. 10 CFR 70.64 - Requirements for new facilities or new processes at existing facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... behavior of items relied on for safety. (b) Facility and system design and facility layout must be based on... existing facilities. (a) Baseline design criteria. Each prospective applicant or licensee shall address the following baseline design criteria in the design of new facilities. Each existing licensee shall address the...

  8. Energy determination in industrial X-ray processing facilities

    NASA Astrophysics Data System (ADS)

    Cleland, M. R.; Gregoire, O.; Stichelbaut, F.; Gomola, I.; Galloway, R. A.; Schlecht, J.

    2005-12-01

    In industrial irradiation facilities, the determination of maximum photon or electron energy is important for regulated processes, such as food irradiation, and for assurance of treatment reproducibility. With electron beam irradiators, this has been done by measuring the depth-dose distribution in a homogeneous material. For X-ray irradiators, an analogous method has not yet been recommended. This paper describes a procedure suitable for typical industrial irradiation processes, which is based on common practice in the field of therapeutic X-ray treatment. It utilizes a measurement of the slope of the exponential attenuation curve of X-rays in a thick stack of polyethylene plates. Monte Carlo simulations and experimental tests have been performed to verify the suitability and accuracy of the method between 3 MeV and 8 MeV.

  9. General view from outside the Orbiter Processing Facility at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view from outside the Orbiter Processing Facility at the Kennedy Space Center with the bay doors open as the Orbiter Discovery is atop the transport vehicle prepared to be moved over to the Vehicle Assembly Building. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX

  10. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  11. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  12. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  13. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  14. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  15. 78 FR 18429 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... costs on to the general public. DATES: Electronic or written comments: OSM will accept written comments... portion of the financial costs for reviewing, administering, and enforcing permits from the general public... general public.'' This charge is designed ``to recover the full cost to the Federal Government for...

  16. The interactive astronomical data analysis facility - image enhancement techniques to Comet Halley

    NASA Astrophysics Data System (ADS)

    Klinglesmith, D. A.

    1981-10-01

    PDP 11/40 computer is at the heart of a general purpose interactive data analysis facility designed to permit easy access to data in both visual imagery and graphic representations. The major components consist of: the 11/40 CPU and 256 K bytes of 16-bit memory; two TU10 tape drives; 20 million bytes of disk storage; three user terminals; and the COMTAL image processing display system. The application of image enhancement techniques to two sequences of photographs of Comet Halley taken in Egypt in 1910 provides evidence for eruptions from the comet's nucleus.

  17. Measurements of methane emissions from natural gas gathering facilities and processing plants: measurement methods

    DOE PAGES

    Roscioli, J. R.; Yacovitch, T. I.; Floerchinger, C.; ...

    2015-05-07

    Increased natural gas production in recent years has spurred intense interest in methane (CH 4) emissions associated with its production, gathering, processing, transmission, and distribution. Gathering and processing facilities (G&P facilities) are unique in that the wide range of gas sources (shale, coal-bed, tight gas, conventional, etc.) results in a wide range of gas compositions, which in turn requires an array of technologies to prepare the gas for pipeline transmission and distribution. We present an overview and detailed description of the measurement method and analysis approach used during a 20-week field campaign studying CH 4 emissions from the natural gasmore » G&P facilities between October 2013 and April 2014. Dual-tracer flux measurements and on-site observations were used to address the magnitude and origins of CH 4 emissions from these facilities. The use of a second tracer as an internal standard revealed plume-specific uncertainties in the measured emission rates of 20–47%, depending upon plume classification. Furthermore, combining downwind methane, ethane (C 2H 6), carbon monoxide (CO), carbon dioxide (CO 2), and tracer gas measurements with on-site tracer gas release allows for quantification of facility emissions and in some cases a more detailed picture of source locations.« less

  18. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...

  19. 76 FR 3092 - Endangered Species Permit No. 1578-01 and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Species Permit No. 1578-01 and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... research permits (Permit Nos. 1578 and 1595- 03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  20. 75 FR 58350 - Endangered Species; Permit No. 1578-01; and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Species; Permit No. 1578-01; and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... modifications to permits (Permit Nos. 1578 and 1595-03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  1. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations; (B) Discharge the same types of wastes or engage in the same types of sludge use or disposal... AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE... or subcategories of discharges or sludge use or disposal practices or facilities described in the...

  2. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...

  3. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  4. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  5. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  6. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  7. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  8. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  9. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  10. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  11. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  12. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  13. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  14. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  15. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  16. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  17. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  18. Orbiter processing facility service platform failure and redesign

    NASA Technical Reports Server (NTRS)

    Harris, Jesse L.

    1988-01-01

    In a high bay of the Orbiter Processing Facility (OPF) at the Kennedy Space Center, technicians were preparing the space shuttle orbiter Discovery for rollout to the Vehicle Assembly Building (VAB). A service platform, commonly referred to as an OPF Bucket, was being retracted when it suddenly fell, striking a technician and impacting Discovery's payload bay door. A critical component in the OPF Bucket hoist system had failed, allowing the platform to fall. The incident was thoroughly investigated by both NASA and Lockheed, revealing many design deficiencies within the system. The deficiencies and the design changes made to correct them are reviewed.

  19. Hardware development process for Human Research facility applications

    NASA Astrophysics Data System (ADS)

    Bauer, Liz

    2000-01-01

    The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. .

  20. Evaluation of Mercury in Liquid Waste Processing Facilities - Phase I Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jain, V.; Occhipinti, J.; Shah, H.

    2015-07-01

    This report provides a summary of Phase I activities conducted to support an Integrated Evaluation of Mercury in Liquid Waste System (LWS) Processing Facilities. Phase I activities included a review and assessment of the liquid waste inventory and chemical processing behavior of mercury using a system by system review methodology approach. Gaps in understanding mercury behavior as well as action items from the structured reviews are being tracked. 64% of the gaps and actions have been resolved.

  1. Evaluation of mercury in liquid waste processing facilities - Phase I report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jain, V.; Occhipinti, J. E.; Shah, H.

    2015-07-01

    This report provides a summary of Phase I activities conducted to support an Integrated Evaluation of Mercury in Liquid Waste System (LWS) Processing Facilities. Phase I activities included a review and assessment of the liquid waste inventory and chemical processing behavior of mercury using a system by system review methodology approach. Gaps in understanding mercury behavior as well as action items from the structured reviews are being tracked. 64% of the gaps and actions have been resolved.

  2. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ...-1231-9BPP] RIN 1018-AZ16 Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven... requirements of the Migratory Bird Permits Program and assigned OMB control number 1018- 0022, which expires... chapter I, title 50 of the Code of Federal Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1...

  3. Issuance of a final RCRA Part B Subpart X permit for open burning/open detonation (OB/OD) of explosives at Eglin AFB, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, G.E.; Culp, J.C.; Jenness, S.R.

    1997-12-31

    Treatment and disposal of explosives and munitions items have represented a significant management challenge for Department of Defense (DOD) facilities, particularly in light of increased regulatory scrutiny under the Federal Facilities Compliance Act provisions of the Resource Conservation and Recovery Act (RCRA). Subpart X of the RCRA regulations for storage, treatment, and disposal of hazardous wastes was drafted specifically to address explosive wastes. Until just recently, any DOD facility that was performing open burning/open detonation (OB/OD) of explosives was doing so under interim status for RCRA Part B Subpart X. In August 1996, Eglin Air Force Base (AFB), Florida becamemore » the first Air Force facility to be issued a final Part B Subpart X permit to perform OB/OD operations at two Eglin AFB active test ranges. This presentation will examine how Eglin AFB worked proactively with the State of Florida Department of Environmental Protection (FDEP) and EPA Region IV to develop permit conditions based upon risk assessment considerations for both air and ground-water exposure pathways. It will review the role of air emissions and air dispersion modeling in assessing potential exposure and impacts to both onsite and offsite receptors, and will discuss how air monitoring will be used to assure that the facility remains in compliance during OB/OD activities. The presentation will also discuss the soil and ground-water characterization program and associated risk assessment provisions for quarterly ground-water monitoring to assure permit compliance. The project is an excellent example of how a collaborative working relationship among the permittee, their consultant and state, and EPA can result in an environmentally protective permit that assures operational flexibility and mission sensitivity.« less

  4. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  5. Instrument Systems Analysis and Verification Facility (ISAVF) users guide

    NASA Technical Reports Server (NTRS)

    Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.

    1985-01-01

    The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.

  6. 30 CFR 773.21 - Initial review and finding requirements for improvidently issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.21 Initial review and finding requirements for improvidently issued permits. (a) If we, the regulatory authority... paragraph (c) of this section, you may challenge the preliminary finding by providing us with evidence as to...

  7. The Establishment of a New Friction Stir Welding Process Development Facility at NASA/MSFC

    NASA Technical Reports Server (NTRS)

    Carter, Robert W.

    2009-01-01

    Full-scale weld process development is being performed at MSFC to develop the tools, fixtures, and facilities necessary for Ares I production. Full scale development in-house at MSFC fosters technical acuity within the NASA engineering community, and allows engineers to identify and correct tooling and equipment shortcomings before they become problems on the production floor. Finally, while the new weld process development facility is currently being outfitted in support of Ares I development, it has been established to support all future Constellation Program needs. In particular, both the RWT and VWT were sized with the larger Ares V hardware in mind.

  8. 40 CFR 122.24 - Concentrated aquatic animal production facilities (applicable to State NPDES programs, see § 123...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...

  9. 40 CFR 122.24 - Concentrated aquatic animal production facilities (applicable to State NPDES programs, see § 123...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...

  10. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  11. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  12. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  13. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  14. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  15. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, N.

    1995-05-02

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD).

  16. Role of Sports Facilities in the Process of Revitalization of Brownfields

    NASA Astrophysics Data System (ADS)

    Taraszkiewicz, Karolina; Nyka, Lucyna

    2017-10-01

    The paper gives an evidence that building a large sports facility can generate beneficial urban space transformation and a significant improvement in the dilapidated urban areas. On the basis of theoretical investigations and case studies it can be proved that sports facilities introduced to urban brownfields could be considered one of the best known large scale revitalization methods. Large urban spaces surrounding sport facilities such as stadiums and other sports arenas create excellent conditions for designing additional recreational function, such as parks and other green areas. Since sports venues are very often located on brownfields and post-industrial spaces, there are usually well related with canals, rivers and other water routes or reservoirs. Such spaces become attractors for large groups of people. This, in effect initiate the process of introducing housing estates to the area and gradually the development of multifunctional urban structure. As research shows such process of favourable urban transformation could be based on implementing several important preconditions. One of the most significant one is the formation of the new communication infrastructure, which links newly formed territories with the well-structured urban core. Well planned program of the new sports facilities is also a very important factor. As research shows multifunctional large sports venues may function in the city as a new kind of public space that stimulates new genres of social relations, offers entertainment and free time activities, not necessarily related with sport. This finally leads to the creation of new jobs and more general improvement of a widely understood image of the district, growing appreciation for the emerging new location and consequently new investments in the neighbouring areas. The research gives new evidence to the ongoing discussion on the drawbacks and benefits of placing stadiums and sports arenas in the urban core.

  17. 50 CFR 622.50 - Permits, permit moratorium, and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Shrimp Fishery of the Gulf of Mexico § 622.50 Permits, permit moratorium, and... Fishery Management Plan for the Shrimp Fishery of the Gulf of Mexico (Gulf Shrimp FMP), all commercial...

  18. The Protein Crystallization Facility STS-95

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The Protein Crystallization Facility will be used to grow crystals of human insulin. Insulin is the primary treatment for diabetes, the fourth leading cause of death by disease. Research on STS-95 is aimed at producing crystals of even higher quality, which when combined with new analysis techniques will permit a better understanding of the interaction between insulin and its receptor. This has the potential to aid in the development of a new commercially available insulin product with unique time release properties that could reduce fluctuations in a patient's blood sugar level. The Protein Crystallization Facility supports large-scale commercial investigations.

  19. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  20. NPDES Permit Writers' Course

    EPA Pesticide Factsheets

    The objective of the NPDES permit writers' course is to provide the basic regulatory framework and technical considerations that support the development of wastewater discharge permits as required under the NPDES Permit Program.