DOE Office of Scientific and Technical Information (OSTI.GOV)
Scott, P.; Olson, R.; Wilkowski, O.G.
1997-06-01
This report presents the results from Subtask 1.3 of the International Piping Integrity Research Group (IPIRG) program. The objective of Subtask 1.3 is to develop data to assess analysis methodologies for characterizing the fracture behavior of circumferentially cracked pipe in a representative piping system under combined inertial and displacement-controlled stresses. A unique experimental facility was designed and constructed. The piping system evaluated is an expansion loop with over 30 meters of 16-inch diameter Schedule 100 pipe. The experimental facility is equipped with special hardware to ensure system boundary conditions could be appropriately modeled. The test matrix involved one uncracked andmore » five cracked dynamic pipe-system experiments. The uncracked experiment was conducted to evaluate piping system damping and natural frequency characteristics. The cracked-pipe experiments evaluated the fracture behavior, pipe system response, and stability characteristics of five different materials. All cracked-pipe experiments were conducted at PWR conditions. Material characterization efforts provided tensile and fracture toughness properties of the different pipe materials at various strain rates and temperatures. Results from all pipe-system experiments and material characterization efforts are presented. Results of fracture mechanics analyses, dynamic finite element stress analyses, and stability analyses are presented and compared with experimental results.« less
30 CFR 75.1905-1 - Diesel fuel piping systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power... Diesel fuel piping systems. (a) Diesel fuel piping systems from the surface must be designed and operated...) Capable of withstanding working pressures and stresses; (2) Capable of withstanding four times the static...
NASA Technical Reports Server (NTRS)
1991-01-01
Phoenix Refrigeration Systems, Inc.'s heat pipe addition to the Phoenix 2000, a supermarket rooftop refrigeration/air conditioning system, resulted from the company's participation in a field test of heat pipes. Originally developed by NASA to control temperatures in space electronic systems, the heat pipe is a simple, effective, heat transfer system. It has been used successfully in candy storage facilities where it has provided significant energy savings. Additional data is expected to fully quantify the impact of the heat pipes on supermarket air conditioning systems.
NASA Astrophysics Data System (ADS)
Chow, L. C.; Hahn, O. J.; Nguyen, H. X.
1992-08-01
This report presents the description of a liquid sodium heat transfer facility (sodium loop) constructed to support the study of transient response of heat pipes. The facility, consisting of the loop itself, a safety system, and a data acquisition system, can be safely operated over a wide range of temperature and sodium flow rate. The transient response of a heat pipe to pulse heat load at the condenser section was experimentally investigated. A 0.457 m screen wick, sodium heat pipe with an outer diameter of 0.127 m was tested under different heat loading conditions. A major finding was that the heat pipe reversed under a pulse heat load applied at the condenser. The time of reversal was approximately 15 to 25 seconds. The startup of the heat pipe from frozen state was also studied. It was found that during the startup process, at least part of the heat pipe was active. The active region extended gradually down to the end of the condenser until all of the working fluid in the heat pipe was molten.
33 CFR 127.1101 - Piping systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...
33 CFR 127.1101 - Piping systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...
33 CFR 127.1101 - Piping systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...
33 CFR 127.1101 - Piping systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...
33 CFR 127.1101 - Piping systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...
NASA Astrophysics Data System (ADS)
Amran, Tengku Sarah Tengku; Ismail, Mohamad Pauzi; Ahmad, Mohamad Ridzuan; Amin, Mohamad Syafiq Mohd; Sani, Suhairy; Masenwat, Noor Azreen; Ismail, Mohd Azmi; Hamid, Shu-Hazri Abdul
2017-01-01
A water pipe is any pipe or tubes designed to transport and deliver water or treated drinking with appropriate quality, quantity and pressure to consumers. The varieties include large diameter main pipes, which supply entire towns, smaller branch lines that supply a street or group of buildings or small diameter pipes located within individual buildings. This distribution system (underground) is used to describe collectively the facilities used to supply water from its source to the point of usage. Therefore, a leaking in the underground water distribution piping system increases the likelihood of safe water leaving the source or treatment facility becoming contaminated before reaching the consumer. Most importantly, leaking can result in wastage of water which is precious natural resources. Furthermore, they create substantial damage to the transportation system and structure within urban and suburban environments. This paper presents a study on the possibility of using ground penetrating radar (GPR) with frequency of 1GHz to detect pipes and leakages in underground water distribution piping system. Series of laboratory experiment was designed to investigate the capability and efficiency of GPR in detecting underground pipes (metal and PVC) and water leakages. The data was divided into two parts: 1. detecting/locating underground water pipe, 2. detecting leakage of underground water pipe. Despite its simplicity, the attained data is proved to generate a satisfactory result indicating GPR is capable and efficient, in which it is able to detect the underground pipe and presence of leak of the underground pipe.
Research notes : drainage facility asset management : more than an inventory of pipes.
DOT National Transportation Integrated Search
2007-04-01
The primary objectives for the research project were twofold: 1) To develop and implement an Oregon-specific system for inventorying and evaluating the condition of pipes, culverts, and stormwater facilities based on the FHWA Culvert Management Syste...
30 CFR 75.1905-1 - Diesel fuel piping systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...
30 CFR 75.1905-1 - Diesel fuel piping systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...
Coupled reactor kinetics and heat transfer model for heat pipe cooled reactors
NASA Astrophysics Data System (ADS)
Wright, Steven A.; Houts, Michael
2001-02-01
Heat pipes are often proposed as cooling system components for small fission reactors. SAFE-300 and STAR-C are two reactor concepts that use heat pipes as an integral part of the cooling system. Heat pipes have been used in reactors to cool components within radiation tests (Deverall, 1973); however, no reactor has been built or tested that uses heat pipes solely as the primary cooling system. Heat pipe cooled reactors will likely require the development of a test reactor to determine the main differences in operational behavior from forced cooled reactors. The purpose of this paper is to describe the results of a systems code capable of modeling the coupling between the reactor kinetics and heat pipe controlled heat transport. Heat transport in heat pipe reactors is complex and highly system dependent. Nevertheless, in general terms it relies on heat flowing from the fuel pins through the heat pipe, to the heat exchanger, and then ultimately into the power conversion system and heat sink. A system model is described that is capable of modeling coupled reactor kinetics phenomena, heat transfer dynamics within the fuel pins, and the transient behavior of heat pipes (including the melting of the working fluid). This paper focuses primarily on the coupling effects caused by reactor feedback and compares the observations with forced cooled reactors. A number of reactor startup transients have been modeled, and issues such as power peaking, and power-to-flow mismatches, and loading transients were examined, including the possibility of heat flow from the heat exchanger back into the reactor. This system model is envisioned as a tool to be used for screening various heat pipe cooled reactor concepts, for designing and developing test facility requirements, for use in safety evaluations, and for developing test criteria for in-pile and out-of-pile test facilities. .
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
Pipe Crawler{reg_sign} is a pipe surveying system for performing radiological characterization and/or free release surveys of piping systems. The technology employs a family of manually advanced, wheeled platforms, or crawlers, fitted with one or more arrays of thin Geiger Mueller (GM) detectors operated from an external power supply and data processing unit. Survey readings are taken in a step-wise fashion. A video camera and tape recording system are used for video surveys of pipe interiors prior to and during radiological surveys. Pipe Crawler{reg_sign} has potential advantages over the baseline and other technologies in areas of cost, durability, waste minimization, andmore » intrusiveness. Advantages include potentially reduced cost, potential reuse of the pipe system, reduced waste volume, and the ability to manage pipes in place with minimal disturbance to facility operations. Advantages over competing technologies include potentially reduced costs and the ability to perform beta-gamma surveys that are capable of passing regulatory scrutiny for free release of piping systems.« less
Heat pipes in space and on earth
NASA Technical Reports Server (NTRS)
Ollendorf, S.
1978-01-01
The performance of heat pipes used in the thermal control system of spacecraft such as OAO-III and ATS-6 is discussed, and applications of heat pipes to permafrost stabilization on the Alaska Pipeline and to heat recovery systems are described. Particular attention is given to the ATS-6, launched in 1974, which employs 55 heat pipes to carry solar and internal power loads to radiator surfaces. In addition, experiments involving radiative cooling based on cryogenic heat pipes have been planned for the Long Duration Exposure Facility spacecraft and for Spacelab. The role of heat pipes in Space Shuttle heat rejection services is also mentioned.
36 CFR 1234.10 - What are the facility requirements for all records storage facilities?
Code of Federal Regulations, 2014 CFR
2014-07-01
... the HVAC systems, fire alarm and fire protection systems. Manual switching between sources of service... elements are protected by a properly installed, properly maintained wet-pipe automatic sprinkler system, as... must provide documentation that the facility has a fire suppression system specifically designed to...
NASA Technical Reports Server (NTRS)
McNelis, Mark E.; Staab, Lucas D.; Akers, James C.; Hughes, William O.; Chang, Li C.; Hozman, Aron D.; Henry, Michael W.
2012-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007 to 2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cubic feet in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their T-junctions connecting the 12 in. supply line to their respective 4 in. branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed T-junction connections through non-destructive evaluation testing. Through structural dynamic modeling of the piping system, the root cause of the T-junction connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.
NASA Technical Reports Server (NTRS)
McNelis, Mark E.; Staab, Lucas D.; Akers, James C.; Hughes, WIlliam O.; Chang, Li, C.; Hozman, Aron D.; Henry, Michael W.
2012-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007-2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cu ft in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their "t-junctions" connecting the 12 inch supply line to their respective 4 inch branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed "t-junction" connections through non-destructive evaluation testing . Through structural dynamic modeling of the piping system, the root cause of the "t-junction" connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.
Code of Federal Regulations, 2010 CFR
2010-07-01
... drainage from diked storage areas by valves to prevent a discharge into the drainage system or facility... facility drainage systems from undiked areas with a potential for a discharge (such as where piping is... pumps. Whatever techniques you use, you must engineer facility drainage systems to prevent a discharge...
For Piping Corrosive Wastes--Glass, Metal Or Plastic? Laboratory Design Notes.
ERIC Educational Resources Information Center
Sell, J. Clyde
1964-01-01
Materials (piping and joints) for waste-piping systems are evaluated and a material or materials best qualified for above ground service in health research facilities are recommended. Evaluation is based on cost and performance because the potential value of any material depends on its ability to compete in both areas. In general, the following…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heifetz, A.; Bakhtiari, S.; Huang, X.
The objective of this project is to develop and demonstrate methods for transmission of information in nuclear facilities by acoustic means along existing in-place metal piping infrastructure. Pipes are omnipresent in a nuclear facility, and penetrate enclosures and partitions, such as the containment building wall. In the envisioned acoustic communication (AC) system, packets of information will be transmitted as guided acoustic waves along pipes. Performance of AC hardware and network protocols for efficient and secure communications under development in this project will be eventually evaluated in a representative nuclear power plant environment. Research efforts in the first year of thismore » project have been focused on identification of appropriate transducers, and evaluation of their performance for information transmission along nuclear-grade metallic pipes. COMSOL computer simulations were performed to study acoustic wave generation, propagation, and attenuation on pipes. An experimental benchtop system was used to evaluate signal attenuation and spectral dispersion using piezo-electric transducers (PZTs) and electromagnetic acoustic transducers (EMATs). Communication protocols under evaluation consisted on-off keying (OOK) signal modulation, in particular amplitude shift keying (ASK) and phase shift keying (PSK). Tradeoffs between signal power and communication data rate were considered for ASK and PSK coding schemes.« less
TSTA Piping and Flame Arrestor Operating Experience Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cadwallader, Lee C.; Willms, R. Scott
The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences andmore » the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.« less
NASA Technical Reports Server (NTRS)
Tiller, Smith E.; Sullivan, David
1992-01-01
An overview of a self-contained Direct Energy Transfer Power System which was developed to provide power to the Long Duration Exposure Facility (LDEF) Low-Temperature Heat Pipe Experiment Package is presented. The power system operated successfully for the entire mission. Data recorded by the onboard recorder shows that the system operated within design specifications. Other than unanticipated overcharging of the battery, the power system operated as expected for nearly 32,000 low earth orbit cycles, and was still operational when tested after the LDEF recovery. Some physical damage was sustained by the solar array panels due to micrometeoroid hits, but there were not electrical failures.
46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...
46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...
46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...
46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...
46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, Steven A.; Lipinski, Ronald J.; Pandya, Tara
2005-02-06
Heat Pipe Reactors (HPR) for space power conversion systems offer a number of advantages not easily provided by other systems. They require no pumping, their design easily deals with freezing and thawing of the liquid metal, and they can provide substantial levels of redundancy. Nevertheless, no reactor has ever been operated and cooled with heat pipes, and the startup and other operational characteristics of these systems remain largely unknown. Signification deviations from normal reactor heat removal mechanisms exist, because the heat pipes have fundamental heat removal limits due to sonic flow issues at low temperatures. This paper proposes an earlymore » prototypic test of a Heat Pipe Reactor (using existing 20% enriched nuclear fuel pins) to determine the operational characteristics of the HPR. The proposed design is similar in design to the HOMER and SAFE-300 HPR designs (Elliot, Lipinski, and Poston, 2003; Houts, et. al, 2003). However, this reactor uses existing UZrH fuel pins that are coupled to potassium heat pipes modules. The prototype reactor would be located in the Sandia Annular Core Research Reactor Facility where the fuel pins currently reside. The proposed reactor would use the heat pipes to transport the heat from the UZrH fuel pins to a water pool above the core, and the heat transport to the water pool would be controlled by adjusting the pressure and gas type within a small annulus around each heat pipe. The reactor would operate as a self-critical assembly at power levels up to 200 kWth. Because the nuclear heated HPR test uses existing fuel and because it would be performed in an existing facility with the appropriate safety authorization basis, the test could be performed rapidly and inexpensively. This approach makes it possible to validate the operation of a HPR and also measure the feedback mechanisms for a typical HPR design. A test of this nature would be the world's first operating Heat Pipe Reactor. This reactor is therefore called 'HPR-1'.« less
Corrosion impact of reductant on DWPF and downstream facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mickalonis, J. I.; Imrich, K. J.; Jantzen, C. M.
2014-12-01
Glycolic acid is being evaluated as an alternate reductant in the preparation of high level waste for the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS). During processing, the glycolic acid is not completely consumed and small quantities of the glycolate anion are carried forward to other high level waste (HLW) facilities. The impact of the glycolate anion on the corrosion of the materials of construction throughout the waste processing system has not been previously evaluated. A literature review had revealed that corrosion data in glycolate-bearing solution applicable to SRS systems were not available. Therefore, testing wasmore » recommended to evaluate the materials of construction of vessels, piping and components within DWPF and downstream facilities. The testing, conducted in non-radioactive simulants, consisted of both accelerated tests (electrochemical and hot-wall) with coupons in laboratory vessels and prototypical tests with coupons immersed in scale-up and mock-up test systems. Eight waste or process streams were identified in which the glycolate anion might impact the performance of the materials of construction. These streams were 70% glycolic acid (DWPF feed vessels and piping), SRAT/SME supernate (Chemical Processing Cell (CPC) vessels and piping), DWPF acidic recycle (DWPF condenser and recycle tanks and piping), basic concentrated recycle (HLW tanks, evaporators, and transfer lines), salt processing (ARP, MCU, and Saltstone tanks and piping), boric acid (MCU separators), and dilute waste (HLW evaporator condensate tanks and transfer line and ETF components). For each stream, high temperature limits and worst-case glycolate concentrations were identified for performing the recommended tests. Test solution chemistries were generally based on analytical results of actual waste samples taken from the various process facilities or of prototypical simulants produced in the laboratory. The materials of construction for most vessels, components and piping were not impacted with the presence of glycolic acid or the impact is not expected to affect the service life. However, the presence of the glycolate anion was found to affect corrosion susceptibility of some materials of construction in the DWPF and downstream facilities, especially at elevated temperatures. The following table summarizes the results of the electrochemical and hot wall testing and indicates expected performance in service with the glycolate anion present.« less
Development of a Laminar Flame Test Facility for Bio-Diesel Characterization
2009-12-01
heat from the fuel injector during operation. NPT Threaded Holes Bolts and Nuts Stainless Steel Pipes 17 Figure 3. Top Flange of the...3 2. Pre- Heat Temperature... Piping Systems........................... 37 2. Leak Test for Combustion Chamber .................................... 38 3. Calibration of High Speed
NASA Technical Reports Server (NTRS)
Mcintosh, Roy; Mccreight, Craig; Brennan, Patrick J.
1992-01-01
The Low Temperature Heat Pipe Flight Experiment (HEPP) is a fairly complicated thermal control experiment that was designed to evaluate the performance of two different low temperature ethane heat pipes and a n-Heptane Phase Change Material (PCM) canister. A total of 388 days of continuous operation with an axially grooved aluminum fixed conductance heat pipe of axially grooved stainless steel heat pipe diode was demonstrated before the EDS batteries lost power. The inability of the HEPP's radiator to cool below 190 K in flight prevented freezing of the PCM and the opportunity to conduct transport tests with the heat pipes. Post flight tests showed that the heat pipes and the PCM are still functioning. This paper presents a summary of the flight data analysis for the HEPP and its related support systems. Pre and post-flight thermal vacuum tests results are presented for the HEPP thermal control system along with individual heat pipe performance and PCM behavior. Appropriate SIG related systems data will also be included along with a 'lessons learned' summary.
78 FR 20128 - Extension of the Designation of Nicaragua for Temporary Protected Status
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... Nicaragua's roads are paved. Hurricane Mitch damaged potable water, sewage treatment systems, water uptake systems, wells, water pump stations, and pipes in Nicaragua. The storm floods and runoff polluted water... education facilities, water supply and sanitation facilities, and the agricultural sector. Living conditions...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaSalle, F.R.; Golbeg, P.R.; Chenault, D.M.
For reactor and nuclear facilities, both Title 10, Code of Federal Regulations, Part 50, and US Department of Energy Order 6430.1A require assessments of the interaction of non-Safety Class 1 piping and equipment with Safety Class 1 piping and equipment during a seismic event to maintain the safety function. The safety class systems of nuclear reactors or nuclear facilities are designed to the applicable American Society of Mechanical Engineers standards and Seismic Category 1 criteria that require rigorous analysis, construction, and quality assurance. Because non-safety class systems are generally designed to lesser standards and seismic criteria, they may become missilesmore » during a safe shutdown earthquake. The resistance of piping, tubing, and equipment to seismically generated missiles is addressed in the paper. Gross plastic and local penetration failures are considered with applicable test verification. Missile types and seismic zones of influence are discussed. Field qualification data are also developed for missile evaluation.« less
Deployment, release and recovery of ocean riser pipes
Person, Abraham; Wetmore, Sherman B.; McNary, James F.
1980-11-18
An ocean thermal energy conversion facility includes a long pipe assembly which is supported at its upper end by the hull of the floating facility. Cold water flows to the facility from deep in the ocean. The pipe assembly comprises an elongate pipe construction and a weight connected to the lower end of the construction by a line of selected length. A floatation collar is connected to the construction at its upper end to cause the construction to have positive buoyancy and a center of buoyancy closer to the upper end of the construction than its center of mass. The weight renders the entire pipe assembly negatively buoyant. In the event that support of the pipe assembly should be lost, as by release of the assembly from the facility hull in an emergency, the assembly sinks to the ocean floor where it is moored by the weight. The pipe construction floats submerged above the ocean floor in a substantially vertical attitude which facilitates recovery of the assembly.
Cryogenic piping material selection for the Component Test Facility (CTF)
NASA Technical Reports Server (NTRS)
St. Cyr, William W.
1991-01-01
The anticipated high cost of the 8500 psi cryogenic and 15,000 psi gas piping systems used in the CTF at NASA's John C. Stennis Space Center led to the consideration of high-strength materials for these piping systems. Based on years of satisfactory service using austenitic stainless steels in cryogenic applications, particularly for hydrogen service, consideration was limited to the austenitic stainless steels. Attention was focused on alternatives to the 304/304L grades of stainless steel traditionally used in these applications. This paper discusses the various considerations that resulted in the decision to continue using 304/304L for the cryogenic piping and the selection of the nitrogen-strengthened 21Cr-6Ni-9Mn alloy (UNS S21903) for the high-pressure gas systems at the CTF.
International Piping Integrity Research Group (IPIRG) Program. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilkowski, G.; Schmidt, R.; Scott, P.
1997-06-01
This is the final report of the International Piping Integrity Research Group (IPIRG) Program. The IPIRG Program was an international group program managed by the U.S. Nuclear Regulatory Commission and funded by a consortium of organizations from nine nations: Canada, France, Italy, Japan, Sweden, Switzerland, Taiwan, the United Kingdom, and the United States. The program objective was to develop data needed to verify engineering methods for assessing the integrity of circumferentially-cracked nuclear power plant piping. The primary focus was an experimental task that investigated the behavior of circumferentially flawed piping systems subjected to high-rate loadings typical of seismic events. Tomore » accomplish these objectives a pipe system fabricated as an expansion loop with over 30 meters of 16-inch diameter pipe and five long radius elbows was constructed. Five dynamic, cyclic, flawed piping experiments were conducted using this facility. This report: (1) provides background information on leak-before-break and flaw evaluation procedures for piping, (2) summarizes technical results of the program, (3) gives a relatively detailed assessment of the results from the pipe fracture experiments and complementary analyses, and (4) summarizes advances in the state-of-the-art of pipe fracture technology resulting from the IPIRG program.« less
Perchlorate Removal, Destruction, and Field Monitoring Demonstration
2006-10-02
ion exchange unit. A pulsation dampener minimized pressure and flow fluctuations in the ion exchange system and a flow totalizer monitored total...instrumentation and controls, piping , electrical services, site work, service facilities, engineering, construction expenses, and other indirect costs were... Piping 113,750 157,500 Electrical services 48,750 67,500 Site work 65,000 90,000
Pipe inspection using the pipe crawler. Innovative technology summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-05-01
The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in rollmore » off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.« less
NASA Astrophysics Data System (ADS)
Clark, Robert M.
2011-12-01
It has become generally accepted that water quality can deteriorate in a distribution system through microbiological and chemical reactions in the bulk phase and/or at the pipe wall. The most serious aspect of water quality deterioration in a network is the loss of the disinfectant residual that can weaken the barrier against microbial contamination. Studies have suggested that one factor contributing to the loss of disinfectant residuals is the reaction between bulk phase disinfectants and pipe wall material. Free chlorine loss in corroded metal and PVC pipes, subject to changes in velocity, was assessed during an experiment conducted under controlled conditions in a specially constructed pipe loop located at the US Environmental Protection Agency's (EPA's) Test and Evaluation (T&E) Facility in Cincinnati, Ohio (USA). These studies demonstrated that in older unlined metal pipes, the loss of chlorine residual increases with velocity but that wall demand in PVC was negligible.
NASA Astrophysics Data System (ADS)
Kaliatka, T.; Povilaitis, M.; Kaliatka, A.; Urbonavicius, E.
2012-10-01
Wendelstein nuclear fusion device W7-X is a stellarator type experimental device, developed by Max Planck Institute of plasma physics. Rupture of one of the 40 mm inner diameter coolant pipes providing water for the divertor targets during the "baking" regime of the facility operation is considered to be the most severe accident in terms of the plasma vessel pressurization. "Baking" regime is the regime of the facility operation during which plasma vessel structures are heated to the temperature acceptable for the plasma ignition in the vessel. This paper presents the model of W7-X cooling system (pumps, valves, pipes, hydro-accumulators, and heat exchangers), developed using thermal-hydraulic state-of-the-art RELAP5 Mod3.3 code, and model of plasma vessel, developed by employing the lumped-parameter code COCOSYS. Using both models the numerical simulation of processes in W7-X cooling system and plasma vessel has been performed. The results of simulation showed, that the automatic valve closure time 1 s is the most acceptable (no water hammer effect occurs) and selected area of the burst disk is sufficient to prevent pressure in the plasma vessel.
Development of cryogenic thermal control heat pipes. [of stainless steels
NASA Technical Reports Server (NTRS)
1978-01-01
The development of thermal control heat pipes that are applicable to the low temperature to cryogenic range was investigated. A previous effort demonstrated that stainless steel axially grooved tubing which met performance requirements could be fabricated. Three heat pipe designs utilizing stainless steel axially grooved tubing were fabricated and tested. One is a liquid trap diode heat pipe which conforms to the configuration and performance requirements of the Heat Pipe Experiment Package (HEPP). The HEPP is scheduled for flight aboard the Long Duration Flight Exposure Facility (LDEF). Another is a thermal switch heat pipe which is designed to permit energy transfer at the cooler of the two identical legs. The third thermal component is a hybrid variable conductance heat pipe (VCHP). The design incorporates both a conventional VCHP system and a liquid trap diode. The design, fabrication and thermal testing of these heat pipes is described. The demonstrated heat pipe behavior including start-up, forward mode transport, recovery after evaporator dry-out, diode performance and variable conductance control are discussed.
Transient Approximation of SAFE-100 Heat Pipe Operation
NASA Technical Reports Server (NTRS)
Bragg-Sitton, Shannon M.; Reid, Robert S.
2005-01-01
Engineers at Los Alamos National Laboratory (LANL) have designed several heat pipe cooled reactor concepts, ranging in power from 15 kWt to 800 kWt, for both surface power systems and nuclear electric propulsion systems. The Safe, Affordable Fission Engine (SAFE) is now being developed in a collaborative effort between LANL and NASA Marshall Space Flight Center (NASA/MSFC). NASA is responsible for fabrication and testing of non-nuclear, electrically heated modules in the Early Flight Fission Test Facility (EFF-TF) at MSFC. In-core heat pipes must be properly thawed as the reactor power starts. Computational models have been developed to assess the expected operation of a specific heat pipe design during start-up, steady state operation, and shutdown. While computationally intensive codes provide complete, detailed analyses of heat pipe thaw, a relatively simple. concise routine can also be applied to approximate the response of a heat pipe to changes in the evaporator heat transfer rate during start-up and power transients (e.g., modification of reactor power level) with reasonably accurate results. This paper describes a simplified model of heat pipe start-up that extends previous work and compares the results to experimental measurements for a SAFE-100 type heat pipe design.
48 CFR 352.242-71 - Tobacco-free facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (e.g., cigarettes, cigars, pipes, and smokeless tobacco) while on any HHS property, including use in.... 352.242-71 Section 352.242-71 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CLAUSES... following clause: Tobacco-free Facilities (January 2006) In accordance with Department of Health and Human...
Site 300 City Water Master Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shaw, Jeff
Lawrence Livermore National Laboratory (LLNL), a scientific research facility, operates an experimental test site known as Site 300. The site is located in a remote area of southeastern Alameda County, California, and consists of about 100 facilities spread across 7,000-acres. The Site 300 water system includes groundwater wells and a system of storage tanks, booster pumps, and underground piping to distribute water to buildings and significant areas throughout the site. Site 300, which is classified as a non-transient non-community (NTNC) water system, serves approximately 110 employees through 109 service connections. The distribution system includes approximately 76,500-feet of water mains varyingmore » from 4- to 10-inches in diameter, mostly asbestos cement (AC) pipe, and eleven water storage tanks. The water system is divided into four pressure zones fed by three booster pump stations to tanks in each zone.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kot, C.A.; Srinivasan, M.G.; Hsieh, B.J.
As part of the Phase II testing at the HDR Test Facility in Kahl/Main, FRG, two series of high-level seismic/vibrational experiments were performed. In the first of these (SHAG) a coast-down shaker, mounted on the reactor operating floor and capable of generating 1000 tonnes of force, was used to investigate full-scale structural response, soil-structure interaction (SSI), and piping/equipment response at load levels equivalent to those of a design basis earthquake. The HDR soil/structure system was tested to incipient failure exhibiting highly nonlinear response. In the load transmission from structure to piping/equipment significant response amplifications and shifts to higher frequencies occurred.more » The performance of various pipe support configurations was evaluated. This latter effort was continued in the second series of tests (SHAM), in which an in-plant piping system was investigated at simulated seismic loads (generated by two servo-hydraulic actuators each capable of generating 40 tonnes of force), that exceeded design levels manifold and resulted in considerable pipe plastification and failure of some supports (snubbers). The evaluation of six different support configurations demonstrated that proper system design (for a given spectrum) rather than number of supports or system stiffness is essential to limiting pipe stresses. Pipe strains at loads exceeding the design level eightfold were still tolerable, indicating that pipe failure even under extreme seismic loads is unlikely inspite of multiple support failures. Conservatively, an excess capacity (margin) of at least four was estimated for the piping system, and the pipe damping was found to be 4%. Comparisons of linear and nonlinear computational results with measurements showed that analytical predictions have wide scatter and do not necessarily yield conservative responses, underpredicting, in particular, peak support forces.« less
LDEF transverse flat plate heat pipe experiment /S1005/. [Long Duration Exposure Facility
NASA Technical Reports Server (NTRS)
Robinson, G. A., Jr.
1979-01-01
The paper describes the Transverse Flat Plate Heat Pipe Experiment. A transverse flat plate heat pipe is a thermal control device that serves the dual function of temperature control and mounting base for electronic equipment. In its ultimate application, the pipe would be a lightweight structure member that could be configured in a platform or enclosure and provide temperature control for large space structures, flight experiments, equipment, etc. The objective of the LDEF flight experiment is to evaluate the zero-g performance of a number of transverse flat plate heat pipe modules. Performance will include: (1) the pipes transport capability, (2) temperature drop, and (3) ability to maintain temperature over varying duty cycles and environments. Performance degradation, if any, will be monitored over the length of the LDEF mission. This information is necessary if heat pipes are to be considered for system designs where they offer benefits not available with other thermal control techniques, such as minimum weight penalty, long-life heat pipe/structural members.
Use of a corrugated beam pipe as a passive deflector for bunch length measurements
NASA Astrophysics Data System (ADS)
Seok, Jimin; Chung, Moses; Kang, Heung-Sik; Min, Chang-Ki; Na, Donghyun
2018-02-01
We report the experimental demonstration of bunch length measurements using a corrugated metallic beam pipe as a passive deflector. The corrugated beam pipe has been adopted for reducing longitudinal chirping after the bunch compressors in several XFEL facilities worldwide. In the meantime, there have been attempts to measure the electron bunch's longitudinal current profile using the dipole wakefields generated in the corrugated pipe. Nevertheless, the bunch shape reconstructed from the nonlinearly deflected beam suffers from significant distortion, particularly near the head of the bunch. In this paper, we introduce an iterative process to improve the resolution of the bunch shape reconstruction. The astra and elegant simulations have been performed for pencil beam and cigar beam cases, in order to verify the effectiveness of the reconstruction process. To overcome the undesirable effects of transverse beam spreads, a measurement scheme involving both the corrugated beam pipe and the spectrometer magnet has been employed, both of which do not require a dedicated (and likely very expensive) rf system. A proof-of-principle experiment was carried out at Pohang Accelerator Laboratory (PAL) Injector Test Facility (ITF), and its results are discussed together with a comparison with the rf deflector measurement.
40 CFR 270.305 - What tank information must I keep at my facility?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., bypass systems, and pressure controls (e.g., vents). (d) A diagram of piping, instrumentation, and process flow for each tank system. (e) A description of materials and equipment used to provide external...
40 CFR 270.305 - What tank information must I keep at my facility?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., bypass systems, and pressure controls (e.g., vents). (d) A diagram of piping, instrumentation, and process flow for each tank system. (e) A description of materials and equipment used to provide external...
40 CFR 270.305 - What tank information must I keep at my facility?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., bypass systems, and pressure controls (e.g., vents). (d) A diagram of piping, instrumentation, and process flow for each tank system. (e) A description of materials and equipment used to provide external...
40 CFR 270.305 - What tank information must I keep at my facility?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., bypass systems, and pressure controls (e.g., vents). (d) A diagram of piping, instrumentation, and process flow for each tank system. (e) A description of materials and equipment used to provide external...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...
36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?
Code of Federal Regulations, 2010 CFR
2010-07-01
... that have been incorporated to minimize loss. The report should make specific reference to appropriate.... Retrofitting may require modifications to the piping system to ensure that adequate water capacity and pressure... storage facilities, boiler rooms or rooms containing equipment operating with a fuel supply (such as...
Heat pipes for low-humidity applications
NASA Technical Reports Server (NTRS)
Khattar, Mukesh K.
1989-01-01
A novel application of an air-to-air heat pipe heat exchanger (HPHX) in a cooling and dehumidification process of an air-conditioning system is described which provides significant energy savings in applications requiring reheat of cold supply air to maintain low humidity. The efficiency of the system has been demonstrated in an application requiring a humidity of 40 percent. The use of the HPHX and fine tuning of the air-conditioning system and controls has resulted in significant energy savings. The technology can be advantageously used in many low-humidity applications commonly encountered in high-tech and aerospace facilities.
The Design of Pressure Safety Systems in the Alumina Industry
NASA Astrophysics Data System (ADS)
Haneman, Brady
The alumina refinery presents the designer with multiple challenges. For a given process flowsheet, the mechanical equipment installed must be routinely inspected and maintained. Piping systems must also be inspected routinely for signs of erosion and/or corrosion. Rapid deposits of chemical species such as lime, silica, and alumina on equipment and piping need special consideration in the mechanical design of the facilities, such that fluid flows are not unduly interrupted. Above and beyond all else, the process plant must be a safe place of work for refinery personnel.
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
2006-10-01
pipe facilities). The Dashboard is based on the NetBeans application platform, a Java-based tool kit. Tools may be written in any language...manner loosely analogous to UNIX shells (especially with respect to UNIX pipe facilities). The Dashboard is based on the NetBeans application
33 CFR 154.1029 - Worst case discharge.
Code of Federal Regulations, 2010 CFR
2010-07-01
... facility. The discharge from each pipe is calculated as follows: The maximum time to discover the release from the pipe in hours, plus the maximum time to shut down flow from the pipe in hours (based on... vessel regardless of the presence of secondary containment; plus (2) The discharge from all piping...
33 CFR 154.1029 - Worst case discharge.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility. The discharge from each pipe is calculated as follows: The maximum time to discover the release from the pipe in hours, plus the maximum time to shut down flow from the pipe in hours (based on... vessel regardless of the presence of secondary containment; plus (2) The discharge from all piping...
33 CFR 154.1029 - Worst case discharge.
Code of Federal Regulations, 2012 CFR
2012-07-01
... facility. The discharge from each pipe is calculated as follows: The maximum time to discover the release from the pipe in hours, plus the maximum time to shut down flow from the pipe in hours (based on... vessel regardless of the presence of secondary containment; plus (2) The discharge from all piping...
33 CFR 154.1029 - Worst case discharge.
Code of Federal Regulations, 2013 CFR
2013-07-01
... facility. The discharge from each pipe is calculated as follows: The maximum time to discover the release from the pipe in hours, plus the maximum time to shut down flow from the pipe in hours (based on... vessel regardless of the presence of secondary containment; plus (2) The discharge from all piping...
33 CFR 154.1029 - Worst case discharge.
Code of Federal Regulations, 2014 CFR
2014-07-01
... facility. The discharge from each pipe is calculated as follows: The maximum time to discover the release from the pipe in hours, plus the maximum time to shut down flow from the pipe in hours (based on... vessel regardless of the presence of secondary containment; plus (2) The discharge from all piping...
NPDES Pretreatment Program in Region 2
Publicly owned treatment works (POTWs) collect wastewater from homes, commercial buildings, and industrial facilities and transport it via a series of pipes, known as a collection system, to the treatment plant. The POTW removes harmful organisms and othe
76 FR 52871 - Pseudomonas fluorescens Strain CL145A; Exemption From the Requirement of a Tolerance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
..., hydroelectric power facility operator or water supply system operator. Potentially affected entities may include... (NAICS code 221111). Water supply and irrigation systems (NAICS code 221310). This listing is not... treatment areas are limited to completely enclosed pipe or water conveyance systems or concrete chambers...
33 CFR 154.2203 - Facility requirements for barge vapor overpressure and vacuum protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... displacement system must provide a pressure-sensing device that activates an alarm that satisfies the... located in the fluid displacement system's piping downstream of any devices that could potentially isolate... to inject the fluid. (d) A fluid displacement system must provide a pressure-sensing device that is...
2015-04-27
Pantograph Feb-2010 UFGS 33 58 00 Leak Detection for Fueling Systems Apr-2008 UFGS 33 52 43.13 Aviation Fuel Piping Feb-2010 UFGS 33 59 00 Tightness of... Pipeline Pressure Testing Guidelines Specifications Questions 2 7/12/2017 3 7/12/2017 DoD Fuels Facilities Documents Unified...UFGS) Most in the 33 nn nn series Associated with Standard Designs Available on WBDG site Coating Systems 4 7/12/2017 Pipeline
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... Water System, the Auxiliary Building Filtered Ventilation Exhaust System, or the Diesel Generators... nuclear service water system (NSWS) for a time period of 14 days. Basis for proposed no significant... the diesel generator buildings in the event of a leak or a break in the system piping. The probability...
Person, Abraham
1980-01-01
In an ocean thermal energy conversion facility, a cold water riser pipe is releasably supported at its upper end by the hull of the floating facility. The pipe is substantially vertical and has its lower end far below the hull above the ocean floor. The pipe is defined essentially entirely of a material which has a modulus of elasticity substantially less than that of steel, e.g., high density polyethylene, so that the pipe is flexible and compliant to rather than resistant to applied bending moments. The position of the lower end of the pipe relative to the hull is stabilized by a weight suspended below the lower end of the pipe on a flexible line. The pipe, apart from the weight, is positively buoyant. If support of the upper end of the pipe is released, the pipe sinks to the ocean floor, but is not damaged as the length of the line between the pipe and the weight is sufficient to allow the buoyant pipe to come to a stop within the line length after the weight contacts the ocean floor, and thereafter to float submerged above the ocean floor while moored to the ocean floor by the weight. The upper end of the pipe, while supported by the hull, communicates to a sump in the hull in which the water level is maintained below the ambient water level. The sump volume is sufficient to keep the pipe full during heaving of the hull, thereby preventing collapse of the pipe.
Point geospatial dataset representing locations of NPDES outfalls/dischargers for facilities which generally represent the site of the discharge. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from treated waste water that is discharged into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more dischargers. The location represents the discharge point of a discrete conveyance such as a pipe or man made ditch.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Srinivasan, M.G.; Kot, C.A.; Mojtahed, M.
The paper describes the analytical modeling, calculations, and results of the posttest nonlinear simulation of high-level seismic testing of the VKL piping system at the HDR Test Facility in Germany. One of the objectives of the tests was to evaluate analytical methods for calculating the nonlinear response of realistic piping systems subjected to high-level seismic excitation that would induce significant plastic deformation. Two out of the six different pipe-support configurations, (ranging from a stiff system with struts and snubbers to a very flexible system with practically no seismic supports), subjected to simulated earthquakes, were tested at very high levels. Themore » posttest nonlinear calculations cover the KWU configuration, a reasonably compliant system with only rigid struts. Responses for 800% safe-shutdown-earthquake loading were calculated using the NONPIPE code. The responses calculated with NONPIPE were found generally to have the same time trends as the measurements but contained under-, over-, and correct estimates of peak values, almost in equal proportions. The only exceptions were the peak strut forces, which were underestimated as a group. The scatter in the peak value estimate of displacements and strut forces was smaller than that for the strains. The possible reasons for the differences and the effort on further analysis are discussed.« less
76 FR 35920 - Notice of Buy American Waiver Under the American Recovery and Reinvestment Act of 2009
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... antifouling system that will be used in the Alaska Region Research Vessel (ARRV). An ultrasonic antifouling system prevents the harmful growth of marine organisms in the ship's sea water inlets and piping systems... by the Foundation's Major Research Equipment and Facilities Construction (MREFC) account. The ARRV is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... underground storage tank (UST) facilities; failure to perform annual tests of automatic line leak detectors... detectors for piping on the UST systems. CHEVRON also agrees under the Consent Decree to install dispenser...
46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...
46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...
46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...
46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...
46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...
TRACER DISPERSION STUDIES FOR HYDRAULIC CHARACTERIZATION OF PIPES
A series of experiments were conducted at the U. S. Environmental Protection Agency (EPA) Test & Evaluation (T&E) Facility in Cincinnati, Ohio, to quantify longitudinal dispersion of a sodium fluoride tracer in polyvinyl chloride (PVC) pipe and ductile iron pipe under laminar, tr...
Insulating Cryogenic Pipes With Frost
NASA Technical Reports Server (NTRS)
Stephenson, J. G.; Bova, J. A.
1985-01-01
Crystallized water vapor fills voids in pipe insulation. Small, carefully controlled amount of water vapor introduced into dry nitrogen gas before it enters aft fuselage. Vapor freezes on pipes, filling cracks in insulation. Ice prevents gaseous nitrogen from condensing on pipes and dripping on structure, in addition to helping to insulate all parts. Industrial applications include large refrigeration plants or facilities that use cryogenic liquids.
NASA Technical Reports Server (NTRS)
Briggs, Maxwell H.; Gibson, Marc A.; Sanzi, James
2017-01-01
The Kilopower project aims to develop and demonstrate scalable fission-based power technology for systems capable of delivering 110 kW of electric power with a specific power ranging from 2.5 - 6.5 Wkg. This technology could enable high power science missions or could be used to provide surface power for manned missions to the Moon or Mars. NASA has partnered with the Department of Energys National Nuclear Security Administration, Los Alamos National Labs, and Y-12 National Security Complex to develop and test a prototypic reactor and power system using existing facilities and infrastructure. This technology demonstration, referred to as the Kilowatt Reactor Using Stirling TechnologY (KRUSTY), will undergo nuclear ground testing in the summer of 2017 at the Nevada Test Site. The 1 kWe variation of the Kilopower system was chosen for the KRUSTY demonstration. The concept for the 1 kWe flight system consist of a 4 kWt highly enriched Uranium-Molybdenum reactor operating at 800 degrees Celsius coupled to sodium heat pipes. The heat pipes deliver heat to the hot ends of eight 125 W Stirling convertors producing a net electrical output of 1 kW. Waste heat is rejected using titanium-water heat pipes coupled to carbon composite radiator panels. The KRUSTY test, based on this design, uses a prototypic highly enriched uranium-molybdenum core coupled to prototypic sodium heat pipes. The heat pipes transfer heat to two Advanced Stirling Convertors (ASC-E2s) and six thermal simulators, which simulate the thermal draw of full scale power conversion units. Thermal simulators and Stirling engines are gas cooled. The most recent project milestone was the completion of non-nuclear system level testing using an electrically heated depleted uranium (non-fissioning) reactor core simulator. System level testing at the Glenn Research Center (GRC) has validated performance predictions and has demonstrated system level operation and control in a test configuration that replicates the one to be used at the Device Assembly Facility (DAF) at the Nevada National Security Site. Fabrication, assembly, and testing of the depleted uranium core has allowed for higher fidelity system level testing at GRC, and has validated the fabrication methods to be used on the highly enriched uranium core that will supply heat for the DAF KRUSTY demonstration.
Facilities Facilities At NREL's state-of-the-art bioenergy research facilities, researchers design options. Photo of interior of industrial, two-story building with high-bay, piping, and large processing
Droplet Combustion and Non-Reactive Shear-Coaxial Jets with Transverse Acoustic Excitation
2012-06-01
Shear-Coaxial Jets Experimental Facility: Piping and Instrumentation Diagram . . . . . . . . . . . . . . . . . . . . . . 196 B Shear-Coaxial Jets...facility piping and instrumentation diagram. . . . . . . . . 197 A.2 Expanded view of section A in Figure A.1. . . . . . . . . . . . . . . . . . 198 A.3...certified to be used in flexible fuel vehicles (FFVs) with engines specifically designed for this fuel. As for possible aviation fuel replacements
10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES ...
10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES OF PIPING, OF WHICH 70 MILES WERE PLUTONIUM PROCESSING LINES. THESE PROCESS LINES RAN THROUGH WALLS AND TRAVERSED SEVERAL FLOORS. (6/29/78) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
PBF (PER620) interior, second basement level. Coolant and tank piping. ...
PBF (PER-620) interior, second basement level. Coolant and tank piping. Mark on vertical pipe says, "H.P. Demin. Water." (High pressure demineralized water.) Date: March 2004. INEEL negative no. HD-41-4-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Socket welds in nuclear facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, P.A.; Torres, L.L.
1995-12-31
Socket welds are easier and faster to make than are butt welds. However, they are often not used in nuclear facilities because the crevices between the pipes and the socket sleeves may be subject to crevice corrosion. If socket welds can be qualified for wider use in facilities that process nuclear materials, the radiation exposures to welders can be significantly reduced. The current tests at the Idaho Chemical Processing Plant (ICPP) are designed to determine if socket welds can be qualified for use in the waste processing system at a nuclear fuel processing plant.
Control Strategies for Zebra Mussel Infestations at Public Facilities
1992-07-01
detailed examina- tion of hard -to-reach surfaces or specific components (such as fire protection systems or intake pipes for sensor devices) should...trash racks. Trash racks could become partially clogged with zebra mussels, shells , and other debris. Flow through the openings would be reduced, and... shells to the top of the lock wall. These are now used by Ontario Hydro for removing zebra mussels. At most facilities, the culvert is totally dewatered
Gap and stripline combined monitor
Yin, Y.
1984-02-16
A combined gap and stripline monitor device for measuring the intensity and position of a charged particle beam bunch in a beam pipe of a synchrotron radiation facility. The monitor has first and second beam pipe portions with an axial gap therebetween. An outer pipe cooperates with the first beam pipe portion to form a gap enclosure, while inner strips cooperate with the first beam pipe portion to form a stripline monitor, with the stripline length being the same as the gap enclosure length.
Gap and stripline combined monitor
Yin, Y.
1986-08-19
A combined gap and stripline monitor device for measuring the intensity and position of a charged particle beam bunch in a beam pipe of a synchrotron radiation facility is disclosed. The monitor has first and second beam pipe portions with an axial gap therebetween. An outer pipe cooperates with the first beam pipe portion to form a gap enclosure, while inner strips cooperate with the first beam pipe portion to form a stripline monitor, with the stripline length being the same as the gap enclosure length. 4 figs.
4 Metre diameter penstock construction for the Raymond Reservoir Hydro Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, H.D.; Alexander, M.
1995-12-31
A four metre diameter 770 m long buried steel penstock was constructed for the 20 MW Raymond Reservoir Hydro Project in southern Alberta. The penstock delivers up to 56.7 m{sup 3}/sec of irrigation water at an effective head of 44 m to a 2.6 m diameter Kaplan turbine. The hydro facility was commissioned in the spring of 1994. The steel pipe was delivered to the site in 18 m long sections from a fabrication plant located 250 km away. Specialized equipment was engineered and constructed to externally coat and internally line the pipe sections on site. The pipe sections, weighingmore » from 27,000 to 30,000 kg, were rolled and moved on a specially built lathe during the external sandblasting and tape wrapping operation. The external tape wrapping is one element of the cathodic protection system for the steel pipe. Specialized equipment was modified to sandblast the interior to white metal and then mechanically apply three coats of internal epoxy lining. The internal lining improves the hydraulic characteristics of the pipe in addition to protecting the pipe from corrosion. This innovative approach to coating and lining the pipe resulted in an exceptionally high quality product at an affordable cost.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE
2005-08-01
Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6)more » 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).« less
NASA Technical Reports Server (NTRS)
Mcintosh, Roy; Mccreight, Craig; Brennan, Patrick J.
1993-01-01
The Low Temperature Heat Pipe Flight Experiment (HEPP) is a fairly complicated thermal control experiment that was designed to evaluate the performance of two different low temperature ethane heat pipes and a low-temperature (182 K) phase change material. A total of 390 days of continuous operation with an axially grooved aluminum fixed conductance heat pipe and an axially grooved stainless steel heat pipe diode was demonstrated before the data acquisition system's batteries lost power. Each heat pipe had approximately 1 watt applied throughout this period. The HEPP was not able to cool below 188.6 K during the mission. As a result, the preprogrammed transport test sequence which initiates when the PCM temperature drops below 180 K was never exercised, and transport tests with both pipes and the diode reverse mode test could not be run in flight. Also, because the melt temperature of the n-heptane PCM is 182 K, its freeze/thaw behavior could not be tested. Post-flight thermal vacuum tests and thermal analyses have indicated that there was an apparent error in the original thermal analyses that led to this unfortunate result. Post-flight tests have demonstrated that the performance of both heat pipes and the PCM has not changed since being fabricated more than 14 years ago. A summary of HEPP's flight data and post-flight test results are presented.
2012-01-01
186 6.2 Non-Reactive Shear-Coaxial Jets . . . . . . . . . . . . . . . . . . . . . . 188 A Shear-Coaxial Jets Experimental Facility: Piping and...185 A.1 Experimental facility piping and instrumentation diagram. . . . . . . . . 194 A.2 Expanded view of section A in Figure...modification, whereas a blend of gasoline and 85% ethanol (E85) is only certified to be used in flexible fuel vehicles (FFVs) with engines specifically
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feng Xie; Hong Li; Jianzhu Cao
A reform will be implemented in the helium purification system of the 10 MW High Temperature Gas-cooled Test Reactor (HTR-10) in China. The measurement of the gamma dose rates of facilities, including valves, pipes, dust filter, etc., in the purification system of the HTR-10, has been performed. The results indicated that most radiation nuclides are concentrated in the dust filter and facilities at the entrance of the helium purification system upstream of the dust filter. Other facilities have the same gamma dose rate level as the background. Based on the previous study and experiences in AVR, the measurement results canmore » be understood that the radioactive dust carried by the helium gas was filtered by the dust filter. It provides important insights for the decontamination and decommissioning of facilities in the primary loop, especially in the helium purification system of the HTR-10 as well as the High Temperature Reactor-Pebble bed Modules (HTR-PM). (authors)« less
NASA Astrophysics Data System (ADS)
Van Dyke, Melissa; Martin, James
2005-02-01
The NASA Marshall Space Flight Center's Early Flight Fission Test Facility (EFF-TF), provides a facility to experimentally evaluate nuclear reactor related thermal hydraulic issues through the use of non-nuclear testing. This facility provides a cost effective method to evaluate concepts/designs and support mitigation of developmental risk. Electrical resistance thermal simulators can be used to closely mimic the heat deposition of the fission process, providing axial and radial profiles. A number of experimental and design programs were underway in 2004 which include the following. Initial evaluation of the Department of Energy Los Alamos National Laboratory 19 module stainless steel/sodium heat pipe reactor with integral gas heat exchanger was operated at up to 17.5 kW of input power at core temperatures of 1000 K. A stainless steel sodium heat pipe module was placed through repeated freeze/thaw cyclic testing accumulating over 200 restarts to a temperature of 1000 K. Additionally, the design of a 37- pin stainless steel pumped sodium/potassium (NaK) loop was finalized and components procured. Ongoing testing at the EFF-TF is geared towards facilitating both research and development necessary to support future decisions regarding potential use of space nuclear systems for space exploration. All efforts are coordinated with DOE laboratories, industry, universities, and other NASA centers. This paper describes some of the 2004 efforts.
77 FR 787 - Transcontinental Gas Pipe Line Company, LLC; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
.... Transco states that the proposed Project is an expansion of its existing pipeline system under which... Market Pool in New Jersey and the existing Manhattan, Central Manhattan, and Narrows delivery points in... appurtenant underground and minor aboveground facilities. The estimated cost of the proposed Project is $341...
9 CFR 416.2 - Establishment grounds and facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... 416.2 Section 416.2 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... where food is processed, handled, stored, or examined; where equipment and utensils are cleaned; and in... discharge waste water or sewage and piping systems that carry water for product manufacturing; and (6...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
... certain natural gas pipeline facilities on its existing mainline system in Prince William, Fairfax... action significantly affecting the quality of the human environment. The National Park Service (NPS... law or special expertise with respect to resources potentially affected by the proposal and...
Design of the LBNF Beamline Target Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tariq, S.; Ammigan, K.; Anderson, K.
2016-10-01
The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructure. Protons hit the target producing mesons which are then focused by the horns into a helium-filled decay pipe where they decay into muons and neutrinos. The target and horns are encased in actively cooled steel and concrete shielding inmore » a chamber called the target chase. The reference design chase is filled with air, but nitrogen and helium are being evaluated as alternatives. A replaceable beam window separates the decay pipe from the target chase. The facility is designed for initial operation at 1.2 MW, with the ability to upgrade to 2.4 MW, and is taking advantage of the experience gained by operating Fermilab’s NuMI facility. We discuss here the design status, associated challenges, and ongoing R&D and physics-driven component optimization of the Target Station.« less
Gap and stripline combined monitor
Yin, Yan
1986-01-01
A combined gap and stripline monitor device (10) for measuring the intensity and position of a charged particle beam bunch in a beam pipe of a synchotron radiation facility. The monitor has first and second beam pipe portions (11a, 11b) with an axial gap (12) therebetween. An outer pipe (14) cooperates with the first beam pipe portion (11a) to form a gap enclosure, while inner strips (23a-d) cooperate with the first beam pipe portion (11a) to form a stripline monitor, with the stripline length being the same as the gap enclosure length.
Development of the real-time control (RTC) system for Tokyo sewage system.
Maeda, M; Mizushima, H; Ito, K
2005-01-01
Tokyo Metropolitan government has decided to make the maximum possible use of the existing facilities while ensuring safety against inundation and to promote measures also from a software approach by introducing a system capable of minimizing combined sewer overflow, the real-time control system (RTC). A pilot RTC system was installed in August 2002 for the Shinozaki Pumping Station. The RTC system monitors the precipitation volume and the water level in the pipe. Simulations were carried out on the basis of these data. From the results, it was found that with the use of the RTC it is possible to reduce CSO by roughly 50% for small rainfalls with a total precipitation level of 20 mm or less by strong rainwater in the pipe routes at the beginning of the rain. It has also been shown that CSO can be reduced by about 80% through the use of rainfall forecasting.
Sodium Heat Pipe Module Processing For the SAFE-100 Reactor Concept
NASA Technical Reports Server (NTRS)
Martin, James; Salvail, Pat
2003-01-01
To support development and hardware-based testing of various space reactor concepts, the Early Flight Fission-Test Facility (EFF-TF) team established a specialized glove box unit with ancillary systems to handle/process alkali metals. Recently, these systems have been commissioned with sodium supporting the fill of stainless steel heat pipe modules for use with a 100 kW thermal heat pipe reactor design. As part of this effort, procedures were developed and refined to govern each segment of the process covering: fill, leak check, vacuum processing, weld closeout, and final "wet in". A series of 316 stainless steel modules, used as precursors to the actual 321 stainless steel modules, were filled with 35 +/- 1 grams of sodium using a known volume canister to control the dispensed mass. Each module was leak checked to less than10(exp -10) std cc/sec helium and vacuum conditioned at 250 C to assist in the removal of trapped gases. A welding procedure was developed to close out the fill stem preventing external gases from entering the evacuated module. Finally the completed modules were vacuum fired at 750 C allowing the sodium to fully wet the internal surface and wick structure of the heat pipe module.
Sodium Heat Pipe Module Processing For the SAFE-100 Reactor Concept
NASA Astrophysics Data System (ADS)
Martin, James; Salvail, Pat
2004-02-01
To support development and hardware-based testing of various space reactor concepts, the Early Flight Fission-Test Facility (EFF-TF) team established a specialized glove box unit with ancillary systems to handle/process alkali metals. Recently, these systems have been commissioned with sodium supporting the fill of stainless steel heat pipe modules for use with a 100 kW thermal heat pipe reactor design. As part of this effort, procedures were developed and refined to govern each segment of the process covering: fill, leak check, vacuum processing, weld closeout, and final ``wet in''. A series of 316 stainless steel modules, used as precursors to the actual 321 stainless steel modules, were filled with 35 +/-1 grams of sodium using a known volume canister to control the dispensed mass. Each module was leak checked to <10-10 std cc/sec helium and vacuum conditioned at 250 °C to assist in the removal of trapped gases. A welding procedure was developed to close out the fill stem preventing external gases from entering the evacuated module. Finally the completed modules were vacuum fired at 750 °C allowing the sodium to fully wet the internal surface and wick structure of the heat pipe module.
Water distribution system and diarrheal disease transmission: a case study in Uzbekistan.
Semenza, J C; Roberts, L; Henderson, A; Bogan, J; Rubin, C H
1998-12-01
Deteriorating water treatment facilities and distribution systems pose a significant public health threat, particularly in republics of the former Soviet Union. Interventions to decrease the disease burden associated with these water systems range from upgrading distribution networks to installing reverse osmosis technology. To provide insight into this decision process, we conducted a randomized intervention study to provide epidemiologic data for water policy decisions in Nukus, Uzbekistan, where drinking water quality is suboptimal. We interviewed residents of 240 households, 120 with and 120 without access to municipal piped water. Residents of 62 households without piped water were trained to chlorinate their drinking water at home in a narrow-necked water container with a spout. All study subjects (1583 individuals) were monitored biweekly for self-reported diarrheal illness over a period of 9.5 weeks. The home chlorination intervention group had the lowest diarrheal rate (28.8/1,000 subjects/month) despite lack of access to piped water in their homes. Compared with the two groups that did not receive the intervention this rate was one-sixth that of the group with no piped water (179.2/1,000 subjects/month) and one-third that of the households with piped water (75.5/1,000 subjects/month). More than 30% of the households with piped water lacked detectable levels of chlorine residues in their drinking water, despite two-stage chlorination of the source water, and were at increased risk of diarrhea. Forty-two percent of these municipal users reported that water pressure had been intermittent within the previous two days. The dramatic reduction in diarrheal rates in the home-chlorination intervention group indicates that a large proportion of diarrheal diseases in Nukus are water-borne. The home-chlorination group had less diarrhea than the group with piped water, implicating the distribution system as a source of disease transmission. Taken together, these epidemiologic data would support the hypothesis that diarrhea in the piped water group could be attributed to cross-contamination between the municipal water supply and sewer, due to leaky pipes and lack of water pressure. Relatively inexpensive steps, including chlorination, maintaining water pressure, and properly maintaining the distribution system, rather than reverse osmosis technology, should reduce diarrheal rates.
High Temperature Electrolysis 4 kW Experiment Design, Operation, and Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.E. O'Brien; X. Zhang; K. DeWall
2012-09-01
This report provides results of long-term stack testing completed in the new high-temperature steam electrolysis multi-kW test facility recently developed at INL. The report includes detailed descriptions of the piping layout, steam generation and delivery system, test fixture, heat recuperation system, hot zone, instrumentation, and operating conditions. This facility has provided a demonstration of high-temperature steam electrolysis operation at the 4 kW scale with advanced cell and stack technology. This successful large-scale demonstration of high-temperature steam electrolysis will help to advance the technology toward near-term commercialization.
Experimental operation of a sodium heat pipe
NASA Astrophysics Data System (ADS)
Holtz, R. E.; McLennan, G. A.; Koehl, E. R.
1985-05-01
This report documents the operation of a 28 in. long sodium heat pipe in the Heat Pipe Test Facility (HPTF) installed at Argonne National Laboratory. Experimental data were collected to simulate conditions prototypic of both a fluidized bed coal combustor application and a space environment application. Both sets of experiment data show good agreement with the heat pipe analytical model. The heat transfer performance of the heat pipe proved reliable over a substantial period of operation and over much thermal cycling. Additional testing of longer heat pipes under controlled laboratory conditions will be necessary to determine performance limitations and to complete the design code validation.
Centrifugal compressor modifications and their effect on high-frequency pipe wall vibration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Motriuk, R.W.; Harvey, D.P.
1998-08-01
High-frequency pulsation generated by centrifugal compressors, with pressure wave-lengths much smaller than the attached pipe diameter, can cause fatigue failures of the compressor internals, impair compressor performance, and damage the attached compressor piping. There are numerous sources producing pulsation in centrifugal compressors. Some of them are discussed in literature at large (Japikse, 1995; Niese, 1976). NGTL has experienced extreme high-frequency discharge pulsation and pipe wall vibration on many of its radial inlet high-flow centrifugal gas compressor facilities. These pulsations led to several piping attachment failures and compressor internal component failures while the compressor operated within the design envelope. This papermore » considers several pulsation conditions at an NGTL compression facility which resulted in unacceptable piping vibration. Significant vibration attenuation was achieved by modifying the compressor (pulsation source) through removal of the diffuser vanes and partial removal of the inlet guide vanes (IGV). Direct comparison of the changes in vibration, pulsation, and performance are made for each of the modifications. The vibration problem, probable causes, options available to address the problem, and the results of implementation are reviewed. The effects of diffuser vane removal on discharge pipe wall vibration as well as changes in compressor performance are described.« less
Performance of buried pipe installation : tech summary.
DOT National Transportation Integrated Search
2010-05-01
Existing codes and recommendations often require standard/minimum values for the bedding, backfi ll, and fi ll cover geometric and : mechanical properties in the installation of buried pipes under transportation facilities. These recommended values a...
University of Minnesota Aquifer Thermal Energy Storage Field Test Facility
NASA Astrophysics Data System (ADS)
Walton, M.; Hoyer, M. C.
1982-12-01
The University of Minnesota Aquifer Thermal Energy Storage (ATES) Field Test Facility became operational. Experiments demonstrated that the Franconia-Ironton-Galesville aquifer will accept injection of 300 gpm (18.9 1 sec (-1)) at reasonable pressures with a heat buildup in the injection well of about 44 psi (31.6 m) over 8 days. Heating of the ground water caused precipitation of carbonate in the piping and injection well, but with proper water conditioning, the system will work satisfactorily at elevated temperatures.
NASA Astrophysics Data System (ADS)
Yamaguchi, S.; Ivanov, Y.; Watanabe, H.; Chikumoto, N.; Koshiduka, H.; Hayashi, K.; Sawamura, T.
Ishikari project constructs two lines. The length of the Line 1 is 500 m, and connects the photovoltaic cell to the internet-data center. The other line is 1 km length, and it is a test facility and called Line 2. The structures of the cable systems are not same to test their performance. The construction was started from 2014 in the field, the Line 1 was completed in May 2015, and it was cooled down and do the current experiment, and warmed up. The Line 2 is almost complete in October 2015. It will be tested in November and December, 2015. In order to reduce the stress of the cable induced by the thermal expansion and contraction, we adopted the way of the helical deformation of the cable. The force of the cable is reduced to 1/3 of an usual cable test. Because the cryogenic pipes are welded in the field and we cannot use the baking of the vacuum chamber of the cryogenic pipe, a new vacuum pumping method was proposed and tested for the cryogenic pipe. Since the straight pipes are used to compose the cryogenic pipe, the pressure drop of the circulation would be 1/100 of the corrugated pipe in the present condition, and it is suitable for longer cable system. The heat leak of the cryogenic pipe is ∼1.4W/m including the cable pipe's and the return pipe's. The heat leak of the current lead is ∼30W/kA in the test bench. Finally the current of 6kA/3 sec and the current of 5kA/15 min were achieved in Line 1. The reduction of heat leak will be a major subject of the longer cable system. The cost of the construction will be almost twice higher than that of the copper and aluminum over-head line with the iron tower in the present Japan. The cost construction of the over-head line is an average value, and depends on the newspaper.
Comparison of Cryogenic Temperature Sensor Installation Inside or Outside the Piping
NASA Astrophysics Data System (ADS)
Müller, R.; Süßer, M.
2010-04-01
Cryogenic thermometers for large cryogenic facilities, like superconducting particle accelerator or fusion devices, must be able to withstand very severe conditions over the lifetime of the facility. In addition to the proper selection of the sensor, the choice of the appropriate installation method plays an important role for satisfying operation. Several characteristics must be taken into account, for instance: large numbers of sensors, different claims of accuracy, qualified preparation methods and at least qualified attachment of the sensor holder on the piping. One remedy to get satisfying results is the development of simple thermometer mounting fixtures, because thermometer mounting often may be realized by personnel with limited experience. This contribution presents two different methods for sensor installations, namely inside or outside installation on the piping. These have been the standard applications in the superconducting coil test facility TOSKA for many years. The characteristics of each of these methods will be discussed and compared.
The "Long Pipe" in CICLoPE: A Design for Detailed Turbulence Measurements
NASA Astrophysics Data System (ADS)
Talamelli, A.; Bellani, G.; Rossetti, A.
A new facility to study high Reynolds number wall bounded turbulent flow has been designed. It will be installed in the laboratory of Center for International Collaboration on Long Pipe Experiments "CICLoPE" in Predappio (Italy). The facility consists of a large pipe, allowing to reach high Reynolds numbers, where all turbulent scales can be resolved with standard measurement techniques. The pipe operates with air at ambient conditions with a maximum speed of 60 m/s in order to avoid any compressibility effect. In order to maintain stable conditions over long period of time the pipe is part of a close loop circuit. The pipe will be located in a tunnel 60 m underground, thus ensuring very low level of external perturbations. The layout resembles an ordinary wind tunnel where the main difference is the long test section, which produces most of the friction losses. This requires the use of a multiple stage axial fan driven by two independent motors. Even though many of the various aerodynamic components are similar to those ordinary used in wind tunnel (corners, diffusers, turbulence manipulators, contraction, etc.) they have been designed aiming at obtaining a very good quality of the flow and minimizing the overall pressure losses.
Engineers conduct key water test for A-3 stand
NASA Technical Reports Server (NTRS)
2009-01-01
Water cascades from the A-2 Test Stand at Stennis Space Center as engineers challenge the limits of the high-pressure water system as part of the preparation process for the A-3 Test Stand under construction. Jeff Henderson, test director for Stennis' A Complex, led a series of tests Nov. 16-20, flowing water simultaneously on the A-1 and A-2 stands, followed by the A-1 and B-1 stands, to determine if the high-pressure industrial water facility pumps and the existing pipe system can support the needs of the A-3 stand. The stand is being built to test rocket engines that will carry astronauts beyond low-Earth orbit and will need about 300,000 gallons of water per minute when operating, but the Stennis system never had been tested to that level. The recent tests were successful in showing the water facility pumps can operate at that capacity - reaching 318,000 gallons per minute in one instance. However, officials continue to analyze data to determine if the system can provide the necessary pressure at that capacity and if the delivery system piping is adequate. 'We just think if there's a problem, it's better to identify and address it now rather than when A-3 is finished and it has to be dealt with,' Henderson said.
Credit PSR. This interior view of the building equipment room ...
Credit PSR. This interior view of the building equipment room displays heat exchangers and fan units with insulated piping for hot and cold water at left. Environmental controls and fire fighting system controls appear at right - Jet Propulsion Laboratory Edwards Facility, Propellant Curing Building, Edwards Air Force Base, Boron, Kern County, CA
26. DETAIL OF CONCRETE PIPE SUPPORTS LEADING TO NEW LIQUID ...
26. DETAIL OF CONCRETE PIPE SUPPORTS LEADING TO NEW LIQUID HYDROGEN TANK FARM; VIEW TO WEST. - Cape Canaveral Air Station, Launch Complex 17, Facility 28402, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
PBF (PER620) interior, basement level. Detail of coolant piping. Date: ...
PBF (PER-620) interior, basement level. Detail of coolant piping. Date: May 2004. INEEL negative no. HD-41-5-2 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
2. CATCH BASIN, INFLOW PIPES AT CENTER, COLD FLOW LABORATORY ...
2. CATCH BASIN, INFLOW PIPES AT CENTER, COLD FLOW LABORATORY AT LEFT, VIEW TOWARDS NORTHWEST. - Glenn L. Martin Company, Titan Missile Test Facilities, Catch Basin, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Mechanical Extraction of Power From Ocean Currents and Tides
NASA Technical Reports Server (NTRS)
Jones, Jack; Chao, Yi
2010-01-01
A proposed scheme for generating electric power from rivers and from ocean currents, tides, and waves is intended to offer economic and environmental advantages over prior such schemes, some of which are at various stages of implementation, others of which have not yet advanced beyond the concept stage. This scheme would be less environmentally objectionable than are prior schemes that involve the use of dams to block rivers and tidal flows. This scheme would also not entail the high maintenance costs of other proposed schemes that call for submerged electric generators and cables, which would be subject to degradation by marine growth and corrosion. A basic power-generation system according to the scheme now proposed would not include any submerged electrical equipment. The submerged portion of the system would include an all-mechanical turbine/pump unit that would superficially resemble a large land-based wind turbine (see figure). The turbine axis would turn slowly as it captured energy from the local river flow, ocean current, tidal flow, or flow from an ocean-wave device. The turbine axis would drive a pump through a gearbox to generate an enclosed flow of water, hydraulic fluid, or other suitable fluid at a relatively high pressure [typically approx.500 psi (approx.3.4 MPa)]. The pressurized fluid could be piped to an onshore or offshore facility, above the ocean surface, where it would be used to drive a turbine that, in turn, would drive an electric generator. The fluid could be recirculated between the submerged unit and the power-generation facility in a closed flow system; alternatively, if the fluid were seawater, it could be taken in from the ocean at the submerged turbine/pump unit and discharged back into the ocean from the power-generation facility. Another alternative would be to use the pressurized flow to charge an elevated reservoir or other pumped-storage facility, from whence fluid could later be released to drive a turbine/generator unit at a time of high power demand. Multiple submerged turbine/pump units could be positioned across a channel to extract more power than could be extracted by a single unit. In that case, the pressurized flows in their output pipes would be combined, via check valves, into a wider pipe that would deliver the combined flow to a power-generating or pumped-storage facility.
NASA Astrophysics Data System (ADS)
Gao, Yan; Liu, Yuyou
2017-06-01
Vibrational energy is transmitted in buried fluid-filled pipes in a variety of wave types. Axisymmetric (n = 0) waves are of practical interest in the application of acoustic techniques for the detection of leaks in underground pipelines. At low frequencies n = 0 waves propagate longitudinally as fluid-dominated (s = 1) and shell-dominated (s = 2) waves. Whilst sensors such as hydrophones and accelerometers are commonly used to detect leaks in water distribution pipes, the mechanism governing the structural and fluid motions is not well documented. In this paper, the low-frequency behaviour of the pipe wall and the contained fluid is investigated. For most practical pipework systems, these two waves are strongly coupled; in this circumstance the ratios of the radial pipe wall displacements along with the internal pressures associated with these two wave types are obtained. Numerical examples show the relative insensitivity of the structural and fluid motions to the s = 2 wave for both metallic and plastic pipes buried in two typical soils. It is also demonstrated that although both acoustic and vibration sensors at the same location provide the identical phase information of the transmitted signals, pressure responses have significantly higher levels than acceleration responses, and thus hydrophones are better suited in a low signal-to-noise ratio (SNR) environment. This is supported by experimental work carried out at a leak detection facility. Additional pressure measurements involved excitation of the fluid and the pipe fitting (hydrant) on a dedicated water pipe. This work demonstrates that the s = 1 wave is mainly responsible for the structural and fluid motions at low frequencies in water distribution pipes as a result of water leakage and direct pipe excitation.
Boedeker, Berthold; Goldstein, Adam; Mahajan, Ekta
2017-11-04
The availability and use of pre-sterilized disposables has greatly changed the methods used in biopharmaceuticals development and production, particularly from mammalian cell culture. Nowadays, almost all process steps from cell expansion, fermentation, cell removal, and purification to formulation and storage of drug substances can be carried out in disposables, although there are still limitations with single-use technologies, particularly in the areas of pretesting and quality control of disposables, bag and connections standardization and qualification, extractables and leachables (E/L) validation, and dependency on individual vendors. The current status of single-use technologies is summarized for all process unit operations using a standard mAb process as an example. In addition, current pros and cons of using disposables are addressed in a comparative way, including quality control and E/L validation.The continuing progress in developing single-use technologies has an important impact on manufacturing facilities, resulting in much faster, less expensive and simpler plant design, start-up, and operation, because cell culture process steps are no longer performed in hard-piped unit operations. This leads to simpler operations in a lab-like environment. Overall it enriches the current landscape of available facilities from standard hard-piped to hard-piped/disposables hybrid to completely single-use-based production plants using the current segregation and containment concept. At the top, disposables in combination with completely and functionally closed systems facilitate a new, revolutionary design of ballroom facilities without or with much less segregation, which enables us to perform good manufacturing practice manufacturing of different products simultaneously in unclassified but controlled areas.Finally, single-use processing in lab-like shell facilities is a big enabler of transferring and establishing production in emergent countries, and this is described in more detail in 7. Graphical Abstract.
A quantitative analysis of surgical capacity in Santa Cruz, Bolivia.
Markin, Abraham; Barbero, Roxana; Leow, Jeffrey J; Groen, Reinou S; Skow, Evan J; Apelgren, Keith N; Kushner, Adam L; Nwomeh, Benedict C
2013-11-01
This investigation aimed to document surgical capacity at public medical centers in a middle-income Latin American country using the Surgeons OverSeas (SOS) Personnel, Infrastructure, Procedures, Equipment, and Supplies (PIPES) survey tool. We applied the PIPES tool at six urban and 25 rural facilities in Santa Cruz, Bolivia. Outcome measures included the availability of items in five domains (Personnel, Infrastructure, Procedures, Equipment, and Supplies) and the PIPES index. PIPES indices were calculated by summing scores from each domain, dividing by the total number of survey items, and multiplying by 10. Thirty-one of the 32 public facilities that provide surgical care in Santa Cruz were assessed. Santa Cruz had at least 7.8 surgeons and 2.8 anesthesiologists per 100,000 population. However, these providers were unequally distributed, such that nine rural sites had no anesthesiologist. Few rural facilities had blood banking (4/25), anesthesia machines (11/25), postoperative care (11/25), or intensive care units (1/25). PIPES indices ranged from 5.7-13.2, and were significantly higher in urban (median 12.6) than rural (median 7.8) areas (P < 0.01). This investigation is novel in its application of a Spanish-language version of the PIPES tool in a middle-income Latin American country. These data document substantially greater surgical capacity in Santa Cruz than has been reported for Sierra Leone or Rwanda, consistent with Bolivia's development status. Unfortunately, surgeons are limited in rural areas by deficits in anesthesia and perioperative services. These results are currently being used to target local quality improvement initiatives. Copyright © 2013 Elsevier Inc. All rights reserved.
Design characteristics of a heat pipe test chamber
NASA Technical Reports Server (NTRS)
Baker, Karl W.; Jang, J. Hoon; Yu, Juin S.
1992-01-01
LeRC has designed a heat pipe test facility which will be used to provide data for validating heat pipe computer codes. A heat pipe test chamber that uses helium gas for enhancing heat transfer was investigated. The conceptual design employs the technique of guarded heating and guarded cooling to facilitate accurate measurements of heat transfer rates to the evaporator and from the condenser. The design parameters are selected for a baseline heat pipe made of stainless steel with an inner diameter of 38.10 mm and a wall thickness of 1.016 mm. The heat pipe operates at a design temperature of 1000 K with an evaporator radial heat flux of 53 W/sq. cm.
Numerical Simulations of Instabilities in Single-Hole Office Elements
NASA Technical Reports Server (NTRS)
Ahuja, Vineet; Hosangadi, Ashvin; Hitt, Matthew A.; Lineberry, David M.
2013-01-01
An orifice element is commonly used in liquid rocket engine test facilities either as a flow metering device, a damper for acoustic resonance or to provide a large reduction in pressure over a very small distance in the piping system. While the orifice as a device is largely effective in stepping down pressure, it is also susceptible to a wake-vortex type instability that generates pressure fluctuations that propagate downstream and interact with other elements of the test facility resulting in structural vibrations. Furthermore in piping systems an unstable feedback loop can exist between the vortex shedding and acoustic perturbations from upstream components resulting in an amplification of the modes convecting downstream. Such was the case in several tests conducted at NASA as well as in the Ariane 5 strap-on P230 engine in a static firing test where pressure oscillations of 0.5% resulted in 5% thrust oscillations. Exacerbating the situation in cryogenic test facilities, is the possibility of the formation of vapor clouds when the pressure in the wake falls below the vapor pressure leading to a cavitation instability that has a lower frequency than the primary wake-vortex instability. The cavitation instability has the potential for high amplitude fluctuations that can cause catastrophic damage in the facility. In this paper high-fidelity multi-phase numerical simulations of an orifice element are used to characterize the different instabilities, understand the dominant instability mechanisms and identify the tonal content of the instabilities.
Experimental apparatus to test air trap valves
NASA Astrophysics Data System (ADS)
Lemos De Lucca, Y. de F.; de Aquino, G. A.; Filho, J. G. D.
2010-08-01
It is known that the presence of trapped air within water distribution pipes can lead to irregular operation or even damage to the distribution systems and their components. The presence of trapped air may occur while the pipes are being filled with water, or while the pumping systems are in operation. The formation of large air pockets can produce the water hammer phenomenon, the instability and the loss of pressure in the water distribution networks. As a result, it can overload the pumps, increase the consumption of electricity, and damage the pumping system. In order to avoid its formation, all of the trapped air should be removed through "air trap valves". In Brazil, manufacturers frequently have unreliable sizing charts, which cause malfunctioning of the "air trap valves". The result of these malfunctions causes accidents of substantial damage. The construction of a test facility will provide a foundation of technical information that will be used to help make decisions when designing a system of pipelines where "air trap valves" are used. To achieve this, all of the valve characteristics (geometric, mechanic, hydraulic and dynamic) should be determined. This paper aims to describe and analyze the experimental apparatus and test procedure to be used to test "air trap valves". The experimental apparatus and test facility will be located at the University of Campinas, Brazil at the College of Civil Engineering, Architecture, and Urbanism in the Hydraulics and Fluid Mechanics laboratory. The experimental apparatus will be comprised of various components (pumps, steel pipes, butterfly valves to control the discharge, flow meter and reservoirs) and instrumentation (pressure transducers, anemometer and proximity sensor). It should be emphasized that all theoretical and experimental procedures should be defined while taking into consideration flow parameters and fluid properties that influence the tests.
Construction of the Propulsion Systems Laboratory No. 1 and 2
1951-01-21
Construction of the Propulsion Systems Laboratory No. 1 and 2 at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. When it began operation in late 1952, the Propulsion Systems Laboratory was the NACA’s most powerful facility for testing full-scale engines at simulated flight altitudes. The facility contained two altitude simulating test chambers which were a technological combination of the static sea-level test stands and the complex Altitude Wind Tunnel, which recreated actual flight conditions on a larger scale. NACA Lewis began designing the new facility in 1947 as part of a comprehensive plan to improve the altitude testing capabilities across the lab. The exhaust, refrigeration, and combustion air systems from all the major test facilities were linked. In this way, different facilities could be used to complement the capabilities of one another. Propulsion Systems Laboratory construction began in late summer 1949 with the installation of an overhead exhaust pipe connecting the facility to the Altitude Wind Tunnel and Engine Research Building. The large test section pieces arriving in early 1951, when this photograph was taken. The two primary coolers for the altitude exhaust are in place within the framework near the center of the photograph.
Small Reactor for Deep Space Exploration
none,
2018-06-06
This is the first demonstration of a space nuclear reactor system to produce electricity in the United States since 1965, and an experiment demonstrated the first use of a heat pipe to cool a small nuclear reactor and then harvest the heat to power a Stirling engine at the Nevada National Security Site's Device Assembly Facility confirms basic nuclear reactor physics and heat transfer for a simple, reliable space power system.
Assessment of Surgical and Trauma Capacity in Potosí, Bolivia.
Blair, Kevin J; Boeck, Marissa A; Gallardo Barrientos, José Luis; Hidalgo López, José Luis; Helenowski, Irene B; Nwomeh, Benedict C; Shapiro, Michael B; Swaroop, Mamta
Scaling up surgical and trauma care in low- and middle-income countries could prevent nearly 2 million annual deaths. Various survey instruments exist to measure surgical and trauma capacity, including Personnel, Infrastructure, Procedures, Equipment, and Supplies (PIPES) and International Assessment of Capacity for Trauma (INTACT). We sought to evaluate surgical and trauma capacity in the Bolivian department of Potosí using a combined PIPES and INTACT tool, with additional questions to further inform intervention targets. In June and July 2014 a combined PIPES and INTACT survey was administered to 20 government facilities in Potosí with a minimum of 1 operating room: 2 third-level, 10 second-level, and 8 first-level facilities. A surgeon, head physician, director, or obstetrician-gynecologist completed the survey. Additional personnel responded to 4 short-answer questions. Survey items were divided into subsections, and PIPES and INTACT indices calculated. Medians were compared via Wilcoxon rank sum and Kruskal-Wallis tests. Six of 20 facilities were located in the capital city and designated urban. Urban establishments had higher median PIPES (8.5 vs 6.7, P = .11) and INTACT (8.5 vs 6.9, P = .16) indices compared with rural. More than half of surgeons and anesthesiologists worked in urban hospitals. Urban facilities had higher median infrastructure and procedure scores compared with rural. Fifty-three individuals completed short-answer questions. Training was most desired in laparoscopic surgery and trauma management; less than half of establishments reported staff with trauma training. Surgical and trauma capacity in Potosí was most limited in personnel, infrastructure, and procedures at rural facilities, with greater personnel deficiencies than previously reported. Interventions should focus on increasing the number of surgical and anesthesia personnel in rural areas, with a particular focus on the reported desire for trauma management training. Results have been made available to key stakeholders in Potosí to inform targeted quality improvement interventions. Copyright © 2017 Icahn School of Medicine at Mount Sinai. Published by Elsevier Inc. All rights reserved.
Heavy Gas Conversion of the NASA Langley Transonic Dynamics Tunnel
NASA Technical Reports Server (NTRS)
Corliss, James M.; Cole, Stanley, R.
1998-01-01
The heavy gas test medium has recently been changed in the Transonic Dynamics Tunnel (TDT) at the NASA Langley Research Center. A NASA Construction of Facilities project has converted the TDT heavy gas from dichlorodifluoromethane (R12) to 1,1,1,2 tetrafluoroethane (R134a). The facility s heavy gas processing system was extensively modified to implement the conversion to R134a. Additional system modifications have improved operator interfaces, hardware reliability, and quality of the research data. The facility modifications included improvements to the heavy gas compressor and piping, the cryogenic heavy gas reclamation system, and the heavy gas control room. A series of wind tunnel characterization and calibration tests are underway. Results of the flow characterization tests show the TDT operating envelope in R134a to be very similar to the previous operating envelope in R12.
Large-Scale Cryogen Systems and Test Facilities
NASA Technical Reports Server (NTRS)
Johnson, R. G.; Sass, J. P.; Hatfield, W. H.
2007-01-01
NASA has completed initial construction and verification testing of the Integrated Systems Test Facility (ISTF) Cryogenic Testbed. The ISTF is located at Complex 20 at Cape Canaveral Air Force Station, Florida. The remote and secure location is ideally suited for the following functions: (1) development testing of advanced cryogenic component technologies, (2) development testing of concepts and processes for entire ground support systems designed for servicing large launch vehicles, and (3) commercial sector testing of cryogenic- and energy-related products and systems. The ISTF Cryogenic Testbed consists of modular fluid distribution piping and storage tanks for liquid oxygen/nitrogen (56,000 gal) and liquid hydrogen (66,000 gal). Storage tanks for liquid methane (41,000 gal) and Rocket Propellant 1 (37,000 gal) are also specified for the facility. A state-of-the-art blast proof test command and control center provides capability for remote operation, video surveillance, and data recording for all test areas.
Sullivan, Thomas E.; Pardini, John A.
1978-01-01
A safety test facility for testing sodium-cooled nuclear reactor components includes a reactor vessel and a heat exchanger submerged in sodium in the tank. The reactor vessel and heat exchanger are connected by an expansion/deflection pipe coupling comprising a pair of coaxially and slidably engaged tubular elements having radially enlarged opposed end portions of which at least a part is of spherical contour adapted to engage conical sockets in the ends of pipes leading out of the reactor vessel and in to the heat exchanger. A spring surrounding the pipe coupling urges the end portions apart and into engagement with the spherical sockets. Since the pipe coupling is submerged in liquid a limited amount of leakage of sodium from the pipe can be tolerated.
52. SOUTH PLANT PROCESS PIPING OVERHEAD RACK, WITH SHELL OIL ...
52. SOUTH PLANT PROCESS PIPING OVERHEAD RACK, WITH SHELL OIL COMPANY FACILITIES IN BACKGROUND. VIEW TO SOUTHEAST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO
2. EXTERIOR VIEW TO THE SOUTH OF THE PIPING ON ...
2. EXTERIOR VIEW TO THE SOUTH OF THE PIPING ON THE ROOF OF AND NEXT TO THE BUILDING. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
Analysis of the Earthquake Impact towards water-based fire extinguishing system
NASA Astrophysics Data System (ADS)
Lee, J.; Hur, M.; Lee, K.
2015-09-01
Recently, extinguishing system installed in the building when the earthquake occurred at a separate performance requirements. Before the building collapsed during the earthquake, as a function to maintain a fire extinguishing. In particular, the automatic sprinkler fire extinguishing equipment, such as after a massive earthquake without damage to piping also must maintain confidentiality. In this study, an experiment installed in the building during the earthquake, the water-based fire extinguishing saw grasp the impact of the pipe. Experimental structures for water-based fire extinguishing seismic construction step by step, and then applied to the seismic experiment, the building appears in the extinguishing of the earthquake response of the pipe was measured. Construction of acceleration caused by vibration being added to the size and the size of the displacement is measured and compared with the data response of the pipe from the table, thereby extinguishing water piping need to enhance the seismic analysis. Define the seismic design category (SDC) for the four groups in the building structure with seismic criteria (KBC2009) designed according to the importance of the group and earthquake seismic intensity. The event of a real earthquake seismic analysis of Category A and Category B for the seismic design of buildings, the current fire-fighting facilities could have also determined that the seismic performance. In the case of seismic design categories C and D are installed in buildings to preserve the function of extinguishing the required level of seismic retrofit design is determined.
18. VIEW OF THE CEILING, THE PIPING TRANSPORTED CHEMICALS FROM ...
18. VIEW OF THE CEILING, THE PIPING TRANSPORTED CHEMICALS FROM A CHEMICAL PREPARATION ROOM ON THE SECOND FLOOR TO THE FIRST FLOOR PROCESS AREAS. (6/12/73) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO
62. Historic propellant piping diagram of oxidant pit at Building ...
62. Historic propellant piping diagram of oxidant pit at Building 202, January 6, 1956. NASA GRC drawing no. CF-101644. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Analytical study of the liquid phase transient behavior of a high temperature heat pipe. M.S. Thesis
NASA Technical Reports Server (NTRS)
Roche, Gregory Lawrence
1988-01-01
The transient operation of the liquid phase of a high temperature heat pipe is studied. The study was conducted in support of advanced heat pipe applications that require reliable transport of high temperature drops and significant distances under a broad spectrum of operating conditions. The heat pipe configuration studied consists of a sealed cylindrical enclosure containing a capillary wick structure and sodium working fluid. The wick is an annular flow channel configuration formed between the enclosure interior wall and a concentric cylindrical tube of fine pore screen. The study approach is analytical through the solution of the governing equations. The energy equation is solved over the pipe wall and liquid region using the finite difference Peaceman-Rachford alternating direction implicit numerical method. The continuity and momentum equations are solved over the liquid region by the integral method. The energy equation and liquid dynamics equation are tightly coupled due to the phase change process at the liquid-vapor interface. A kinetic theory model is used to define the phase change process in terms of the temperature jump between the liquid-vapor surface and the bulk vapor. Extensive auxiliary relations, including sodium properties as functions of temperature, are used to close the analytical system. The solution procedure is implemented in a FORTRAN algorithm with some optimization features to take advantage of the IBM System/370 Model 3090 vectorization facility. The code was intended for coupling to a vapor phase algorithm so that the entire heat pipe problem could be solved. As a test of code capabilities, the vapor phase was approximated in a simple manner.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tendera, P.
At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany NPP is about ten years in operation (four units 440 MW - WWER model 213) and Temelin NPP is under construction (two units 1000 MW-WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufactures. The objective for the Czech LBB programme is to prove the LBB status of the primary piping systems of these NPPs and the LBB concept is a part of strategy to meetmore » western style safety standards. The reason for the Czech LBB project is a lack of some standard safety facilities, too. For both Dukovany and Temolin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASME, CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No. 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quotes} and consists of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.« less
OTEC Cold Water Pipe-Platform Subsystem Dynamic Interaction Validation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Varley, Robert; Halkyard, John; Johnson, Peter
A commercial floating 100-megawatt (MW) ocean thermal energy conversion (OTEC) power plant will require a cold water pipe (CWP) with a diameter of 10-meter (m) and length of up to 1,000 m. The mass of the cold water pipe, including entrained water, can exceed the mass of the platform supporting it. The offshore industry uses software-modeling tools to develop platform and riser (pipe) designs to survive the offshore environment. These tools are typically validated by scale model tests in facilities able to replicate real at-sea meteorological and ocean (metocean) conditions to provide the understanding and confidence to proceed to finalmore » design and full-scale fabrication. However, today’s offshore platforms (similar to and usually larger than those needed for OTEC applications) incorporate risers (or pipes) with diameters well under one meter. Secondly, the preferred construction method for large diameter OTEC CWPs is the use of composite materials, primarily a form of fiber-reinforced plastic (FRP). The use of these material results in relatively low pipe stiffness and large strains compared to steel construction. These factors suggest the need for further validation of offshore industry software tools. The purpose of this project was to validate the ability to model numerically the dynamic interaction between a large cold water-filled fiberglass pipe and a floating OTEC platform excited by metocean weather conditions using measurements from a scale model tested in an ocean basin test facility.« less
Status and Construction of the Belle II DEPFET pixel system
NASA Astrophysics Data System (ADS)
Lütticke, Florian
2014-06-01
DEpleted P-channel Field Effect Transistor (DEPFET) active pixel detectors combine detection with a first amplification stage in a fully depleted detector, resulting in an superb signal-to-noise ratio even for thin sensors. Two layers of thin (75 micron) silicon DEPFET pixels will be used as the innermost vertex system, very close to the beam pipe in the Belle II detector at the SuperKEKB facility. The status of the 8 million DEPFET pixels detector, latest developments and current system tests will be discussed.
PBF Reactor Building (PER620). Cubicle 10. Camera facing southeast. Loop ...
PBF Reactor Building (PER-620). Cubicle 10. Camera facing southeast. Loop pressurizer on right. Other equipment includes loop strained, control valves, loop piping, pressurizer interchanger, and cleanup system cooler. High-density shielding brick walls. Photographer: Kirsh. Date: November 2, 1970. INEEL negative no. 70-4908 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Integrated Biorefinery Research Facility | Bioenergy | NREL
industrial, two-story building with high-bay, piping, and large processing equipment. Three workers in hard intellectual property and helping industrial partners commercialize technologies. Testing Facilities and
37. PLAN OF ACCESS CORRIDOR PIPING INCLUDES WASTE HOLD TANK ...
37. PLAN OF ACCESS CORRIDOR PIPING INCLUDES WASTE HOLD TANK CELL, OFFGAS CELL, ADSORBER CELL, AND OFFGAS FILTER CELL. INEEL DRAWING NUMBER 200-0633-00-287-106453. FLUOR NUMBER 5775-CPP-P-58. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
Apparatus for moving a pipe inspection probe through piping
Zollinger, W.T.; Appel, D.K.; Lewis, G.W.
1995-07-18
A method and apparatus are disclosed for controllably moving devices for cleaning or inspection through piping systems, including piping systems with numerous piping bends therein, by using hydrostatic pressure of a working fluid introduced into the piping system. The apparatus comprises a reservoir or other source for supplying the working fluid to the piping system, a launch tube for admitting the device into the launcher and a reversible, positive displacement pump for controlling the direction and flow rate of the working fluid. The device introduced into the piping system moves with the flow of the working fluid through the piping system. The launcher attaches to the valved ends of a piping system so that fluids in the piping system can recirculate in a closed loop. The method comprises attaching the launcher to the piping system, supplying the launcher with working fluid, admitting the device into the launcher, pumping the working fluid in the direction and at the rate desired so that the device moves through the piping system for pipe cleaning or inspection, removing the device from the launcher, and collecting the working fluid contained in the launcher. 8 figs.
Apparatus for moving a pipe inspection probe through piping
Zollinger, W. Thor; Appel, D. Keith; Lewis, Gregory W.
1995-01-01
A method and apparatus for controllably moving devices for cleaning or inspection through piping systems, including piping systems with numerous piping bends therein, by using hydrostatic pressure of a working fluid introduced into the piping system. The apparatus comprises a reservoir or other source for supplying the working fluid to the piping system, a launch tube for admitting the device into the launcher and a reversible, positive displacement pump for controlling the direction and flow rate of the working fluid. The device introduced into the piping system moves with the flow of the working fluid through the piping system. The launcher attaches to the valved ends of a piping system so that fluids in the piping system can recirculate in a closed loop. The method comprises attaching the launcher to the piping system, supplying the launcher with working fluid, admitting the device into the launcher, pumping the working fluid in the direction and at the rate desired so that the device moves through the piping system for pipe cleaning or inspection, removing the device from the launcher, and collecting the working fluid contained in the launcher.
Valve For Extracting Samples From A Process Stream
NASA Technical Reports Server (NTRS)
Callahan, Dave
1995-01-01
Valve for extracting samples from process stream includes cylindrical body bolted to pipe that contains stream. Opening in valve body matched and sealed against opening in pipe. Used to sample process streams in variety of facilities, including cement plants, plants that manufacture and reprocess plastics, oil refineries, and pipelines.
NASA Technical Reports Server (NTRS)
VanDyke, Melissa; Martin, James
2005-01-01
The EFF-TF provides a facility to experimentally evaluate thermal hydraulic issues through the use of highly effective non-nuclear testing. These techniques provide a rapid, more cost effective method of evaluating designs and support development risk mitigation when concerns are associated with non-nuclear aspects of space nuclear systems. For many systems, electrical resistance thermal simulators can be used to closely mimic the heat deposition of the fission process, providing axial and radial profiles. A number of experimental and design programs were underway in 2004. Initial evaluation of the SAFE-100a (19 module stainless steel/sodium heat pipe reactor with integral gas neat exchanger) was performed with tests up to 17.5 kW of input power at core temperatures of 1000 K. A stainless steel sodium SAFE-100 heat pipe module was placed through repeated freeze/thaw cyclic testing accumulating over 200 restarts to a temperature of 1000 K. Additionally, the design of a 37-fuel pin stainless steel pumped sodium/potassium (NaK) loop was finalized and components procured. Ongoing testing at the EFF-TF is geared towards facilitating both research and development necessary to field a near term space nuclear system. Efforts are coordinated with DOE laboratories, industry, universities, and other NASA centers. This paper describes some of the 2004 efforts.
Solar heating system installed at Troy, Ohio
NASA Technical Reports Server (NTRS)
1980-01-01
The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.
Heat Recovery at Army Materiel Command (AMC) Facilities
1988-06-01
industrial complexes and somewhat smaller commercial/ HVAC ** systems, a portion of this waste heat can be recovered, improving energy efficiency. Heat...devices are used in sequence. Other shell-and-tube applications include heat transfer from process liquids, condensates, and cooling water. Two...pipe consists of a sealed element involving an annular capillary wick con- tained inside the full length of the tube, with an appropriate entrained
NASA Technical Reports Server (NTRS)
1994-01-01
In Stennis Space Center's Component Test Facility, piping lines carry rocket propellants and high pressure cryogenic fuels. When the lines are chilled to a pretest temperature of 400 degrees below zero, ordinary piping connectors can leak. Under contract to Stennis, Reflange, Inc. developed the T-Con connector, which included a secondary seal that tolerates severe temperature change. Because of the limited need for the large and expensive T-Con product, Reflange also developed the less costly E-Con, a smaller more compact design with the same technical advantages as the T-Con.
NASA Technical Reports Server (NTRS)
1993-01-01
A complex of high pressure piping at Stennis Space Center carries rocket propellants and other fluids/gases through the Center's Component Test Facility. Conventional clamped connectors tend to leak when propellant lines are chilled to extremely low temperatures. Reflange, Inc. customized an existing piping connector to include a secondary seal more tolerant of severe thermal gradients for Stennis. The T-Con connector solved the problem, and the company is now marketing a commercial version that permits testing, monitoring or collecting any emissions that may escape the primary seal during severe thermal transition.
Liu, Hongliang; Zhang, Lei; Feng, Lihong; Wang, Fei; Xue, Zhiming
2009-09-01
To assess the effect of air quality of cleaning and disinfection on central air-conditioning ventilation systems. 102 air-conditioning ventilation systems in 46 public facilities were sampled and investigated based on Hygienic assessment criterion of cleaning and disinfection of public central air-conditioning systems. Median dust volume decreased from 41.8 g/m2 to 0.4 g/m2, and the percentage of pipes meeting the national standard for dust decreased from 17.3% (13/60) to 100% (62/62). In the dust, median aerobic bacterial count decreased from 14 cfu/cm2 to 1 cfu/cm2. Median aerobic fungus count decreased from 10 cfu/cm2 to 0 cfu/cm2. The percentage of pipes with bacterial and fungus counts meeting the national standard increased from 92.4% (171/185) and 82.2% (152/185) to 99.4% (165/166) and 100% (166/166), respectively. In the ventilation air, median aerobic bacterial count decreased from 756 cfu/m3 to 229 cfu/m3. Median aerobic fungus count decreased from 382 cfu/m3 to 120 cfu/m3. The percentage of pipes meeting the national standard for ventilation air increased from 33.3% (81/243) and 62.1% (151/243) to 79.8% (292/366) and 87.7% (242/276), respectively. But PM10 rose from 0.060 mg/m3 to 0.068 mg/m3, and the percentage of pipes meeting the national standard for PM10 increased from 74.2% (13/60) to 90.2% (46/51). The cleaning and disinfection of central air-conditioning ventilation systems could have a beneficial effect of air quality.
Intrusion of Soil Water through Pipe Cracks
This report describes a series of experiments conducted at U.S. EPA’s Test and Evaluation Facility in 2013-2014 to study the intrusion of contaminated soil water into a pipe crack during simulated backflow events. A test rig was used consisting of a 3’ x 3’ x 3’ acrylic soil bo...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-03
... proposing to further delay the compliance date for facilities with milk containers, associated piping and... a January 15, 2009 action that proposed to exempt these containers from the SPCC requirements. The... SPCC requirements for these milk containers, associated piping and appurtenances, or as specified by a...
7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Poisoning and Prevention Act of 1971 (42 U.S.C. 4801) and the National Consumer Health Information and... (Government Printing Office stock No. 041-001-00187-5) as prepared by the Federal Coordinating Council for Science, Engineering and Technology. (14) Pipe. All pipe used shall meet current American Society for...
Preoperational test report, recirculation ventilation systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifton, F.T.
1997-11-11
This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.
Collective operations in a file system based execution model
Shinde, Pravin; Van Hensbergen, Eric
2013-02-12
A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.
Collective operations in a file system based execution model
Shinde, Pravin; Van Hensbergen, Eric
2013-02-19
A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.
NASA Technical Reports Server (NTRS)
Gibbs, James B
1954-01-01
The starting characteristics and combustion performance of slurry type fuels, consisting of 50 percent magnesium powder in a hydrocarbon carrier, have been investigated in a flight-type, 6.5-inch-diameter ram-jet engine in a connected-pipe facility. Quick, dependable starting of the engine was obtained by the use of a disk which blocked part of the combustor area downstream of the flame holder. Acceptable performance was achieved with a short fuel-air mixing length by the development of a fuel-distribution control sleeve.
NASA Astrophysics Data System (ADS)
Powell, M. A.; Rawlinson, K. S.
A kinetic Stirling cycle engine, the Stirling Thermal Motors (STM) STM4-120, was tested at the Sandia National Laboratories Engine Test Facility (ETF) from March 1989-August 1992. Sandia is interested in determining this engine's potential for solar-thermal-electric applications. The last round of testing was conducted from July-August 1992 using Sandia-designed gas-fired heat pipe evaporators as the heat input system to the engine. The STM4-120 was performance mapped over a range of sodium vapor temperatures, cooling water temperatures, and cycle pressures. The resulting shaft power output levels ranged from 5-9 kW. The engine demonstrated high conversion efficiency (24-31%) even though the power output level was less than 40% of the rated output of 25 kW. The engine had been previously derated from 25 kW to 10 kW shaft power due to mechanical limitations that were identified by STM during parallel testing at their facility in Ann Arbor, MI. A statistical method was used to design the experiment, to choose the experimental points, and to generate correlation equations describing the engine performance given the operating parameters. The testing was truncated due to a failure of the heat pipe system caused by entrainment of liquid sodium in the condenser section of the heat pipes. Enough data was gathered to generate the correlations and to demonstrate the experimental technique. The correlation is accurate in the experimental space and is simple enough for use in hand calculations and spreadsheet-based system models. Use of this method can simplify the construction of accurate performance and economic models of systems in which the engine is a component. The purpose of this paper is to present the method used to design the experiments and to analyze the performance data.
The Development of a Manhole Access Pipe-Crawler System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, M.
2000-09-19
The Savannah River Site's (SRS) Environmental Restoration Division (ERD) is in the process of reconditioning and decommissioning potentially contaminated facilities. Many of these facilities require inspection prior to remediation tasks. Remote inspections are necessary to reduce hazards and ensure the health and safety of workers and the public. To aid in ERD's efforts, the Remote and Specialty Equipment Systems (RSES) section developed a remote inspection vehicle referred to as the Manhole Access Pipecrawler System (MAPS). The MAPS is comprised of a battery-powered mobile vehicle, a portable control console, a cable reel enclosing 300 feet of tethered cable, and a deployment/retrievalmore » system. The components used in MAPS are predominantly standard off-the-shelf items to reduce fabrication costs. Parts were chosen based on size and durability to satisfy SRS operating conditions.« less
Acoustic system for communication in pipelines
Martin, II, Louis Peter; Cooper, John F [Oakland, CA
2008-09-09
A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.
As-built data capture of complex piping using photogrammetry technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morray, J.P.; Ziu, C.G.
1995-11-01
Plant owners face an increasingly difficult and expensive task of updating drawings, both regarding the plant logic and physical layout. Through the use of photogrammetry technology, H-H spectrum has created a complete operating plant data capture service, with the result that the task of recording accurate plant configurations has become assured and economical. The technology has proven to be extremely valuable for the capture of complex piping configurations, as well as entire plant facilities, and yields accuracy within 1/4 inch. The method uses photographs and workstation technology to quickly document and compute the plant layout, with all components, regardless ofmore » size, included in the resulting model. The system has the capability to compute actual 3-D coordinates of any point based on previous triangulations, allowing for an immediate assessment of accuracy. This ensures a consistent level of accuracy, which is impossible to achieve in a manual approach. Due to the speed of the process, the approach is very important in hazardous/difficult environments such as nuclear power facilities or offshore platforms.« less
Piping support system for liquid-metal fast-breeder reactor
Brussalis, Jr., William G.
1984-01-01
A pipe support consisting of a rigid link pivotally attached to a pipe and an anchor, adapted to generate stress or strain in the link and pipe due to pipe thermal movement, which stress or strain can oppose further pipe movement and generally provides pipe support. The pipe support can be used in multiple combinations with other pipe supports to form a support system. This support system is most useful in applications in which the pipe is normally operated at a constant elevated or depressed temperature such that desired stress or strain can be planned in advance of pipe and support installation. The support system is therefore especially useful in steam stations and in refrigeration equipment.
The paper compares the particle size distribution of heavy-duty diesel exhaust using a dilution tail-pipe sampler and an in-plume sampler during on-road operation. EPA's On-road Diesel Emissions Characterization Facility, modified to incorporate particle measurement instrumentat...
An Experimental Study of Contaminant Intrusion Through Pipe Cracks
This report describes a series of experiments conducted at U.S. EPA’s Test and Evaluation Facility in 2013-2014 to study the intrusion of contaminated soil water into a pipe crack during simulated backflow events. A test rig was used consisting of a 3’ x 3’ x 3’ acrylic soil bo...
Thermographic identification of wetted insulation on pipelines in the arctic oilfields
NASA Astrophysics Data System (ADS)
Miles, Jonathan J.; Dahlquist, A. L.; Dash, L. C.
2006-04-01
Steel pipes used at Alaskan oil-producing facilities to transport production crude, gas, and injection water between well house and drill site manifold building, and along cross-country lines to and from central processing facilities, must be insulated in order to protect against the severely cold temperatures that are common during the arctic winter. A problem inherent with this system is that the sealed joints between adjacent layers of the outer wrap will over time degrade and can allow water to breach the system and migrate into and through the insulation. The moisture can ultimately interact with the steel pipe and trigger external corrosion which, if left unchecked, can lead to pipe failure and spillage. A New Technology Evaluation Guideline prepared for ConocoPhillips Alaska, Inc. in 2001 is intended to guide the consideration of new technologies for pipeline inspection in a manner that is safer, faster, and more cost-effective than existing techniques. Infrared thermography (IRT) was identified as promising for identification of wetted insulation regions given that it offers the means to scan a large area quickly from a safe distance, and measure the temperature field associated with that area. However, it was also recognized that there are limiting factors associated with an IRT-based approach including instrument sensitivity, cost, portability, functionality in hostile (arctic) environments, and training required for proper interpretation of data. A methodology was developed and tested in the field that provides a technique to conduct large-scale screening for wetted regions along insulated pipelines. The results of predictive modeling analysis and testing demonstrate the feasibility under certain condition of identifying wetted insulation areas. The results of the study and recommendations for implementation are described.
Fish, Katherine E; Collins, Richard; Green, Nicola H; Sharpe, Rebecca L; Douterelo, Isabel; Osborn, A Mark; Boxall, Joby B
2015-01-01
Within drinking water distribution systems (DWDS), microorganisms form multi-species biofilms on internal pipe surfaces. A matrix of extracellular polymeric substances (EPS) is produced by the attached community and provides structure and stability for the biofilm. If the EPS adhesive strength deteriorates or is overcome by external shear forces, biofilm is mobilised into the water potentially leading to degradation of water quality. However, little is known about the EPS within DWDS biofilms or how this is influenced by community composition or environmental parameters, because of the complications in obtaining biofilm samples and the difficulties in analysing EPS. Additionally, although biofilms may contain various microbial groups, research commonly focuses solely upon bacteria. This research applies an EPS analysis method based upon fluorescent confocal laser scanning microscopy (CLSM) in combination with digital image analysis (DIA), to concurrently characterize cells and EPS (carbohydrates and proteins) within drinking water biofilms from a full-scale DWDS experimental pipe loop facility with representative hydraulic conditions. Application of the EPS analysis method, alongside DNA fingerprinting of bacterial, archaeal and fungal communities, was demonstrated for biofilms sampled from different positions around the pipeline, after 28 days growth within the DWDS experimental facility. The volume of EPS was 4.9 times greater than that of the cells within biofilms, with carbohydrates present as the dominant component. Additionally, the greatest proportion of EPS was located above that of the cells. Fungi and archaea were established as important components of the biofilm community, although bacteria were more diverse. Moreover, biofilms from different positions were similar with respect to community structure and the quantity, composition and three-dimensional distribution of cells and EPS, indicating that active colonisation of the pipe wall is an important driver in material accumulation within the DWDS.
Fish, Katherine E.; Collins, Richard; Green, Nicola H.; Sharpe, Rebecca L.; Douterelo, Isabel; Osborn, A. Mark; Boxall, Joby B.
2015-01-01
Within drinking water distribution systems (DWDS), microorganisms form multi-species biofilms on internal pipe surfaces. A matrix of extracellular polymeric substances (EPS) is produced by the attached community and provides structure and stability for the biofilm. If the EPS adhesive strength deteriorates or is overcome by external shear forces, biofilm is mobilised into the water potentially leading to degradation of water quality. However, little is known about the EPS within DWDS biofilms or how this is influenced by community composition or environmental parameters, because of the complications in obtaining biofilm samples and the difficulties in analysing EPS. Additionally, although biofilms may contain various microbial groups, research commonly focuses solely upon bacteria. This research applies an EPS analysis method based upon fluorescent confocal laser scanning microscopy (CLSM) in combination with digital image analysis (DIA), to concurrently characterize cells and EPS (carbohydrates and proteins) within drinking water biofilms from a full-scale DWDS experimental pipe loop facility with representative hydraulic conditions. Application of the EPS analysis method, alongside DNA fingerprinting of bacterial, archaeal and fungal communities, was demonstrated for biofilms sampled from different positions around the pipeline, after 28 days growth within the DWDS experimental facility. The volume of EPS was 4.9 times greater than that of the cells within biofilms, with carbohydrates present as the dominant component. Additionally, the greatest proportion of EPS was located above that of the cells. Fungi and archaea were established as important components of the biofilm community, although bacteria were more diverse. Moreover, biofilms from different positions were similar with respect to community structure and the quantity, composition and three-dimensional distribution of cells and EPS, indicating that active colonisation of the pipe wall is an important driver in material accumulation within the DWDS. PMID:25706303
Full Scale Drinking Water System Decontamination at the Water Security Test Bed.
Szabo, Jeffrey; Hall, John; Reese, Steve; Goodrich, Jim; Panguluri, Sri; Meiners, Greg; Ernst, Hiba
2018-03-20
The EPA's Water Security Test Bed (WSTB) facility is a full-scale representation of a drinking water distribution system. In collaboration with the Idaho National Laboratory (INL), EPA designed the WSTB facility to support full-scale evaluations of water infrastructure decontamination, real-time sensors, mobile water treatment systems, and decontamination of premise plumbing and appliances. The EPA research focused on decontamination of 1) Bacillus globigii (BG) spores, a non-pathogenic surrogate for Bacillus anthracis and 2) Bakken crude oil. Flushing and chlorination effectively removed most BG spores from the bulk water but BG spores still remained on the pipe wall coupons. Soluble oil components of Bakken crude oil were removed by flushing although oil components persisted in the dishwasher and refrigerator water dispenser. Using this full-scale distribution system allows EPA to 1) test contaminants without any human health or ecological risk and 2) inform water systems on effective methodologies responding to possible contamination incidents.
Cleaning residual NaK in the fast flux test facility fuel storage cooling system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burke, T.M.; Church, W.R.; Hodgson, K.M.
2008-01-15
The Fast Flux Test Facility (FFTF), located on the U.S. Department of Energy's Hanford Reservation, is a liquid metal-cooled test reactor. The FFTF was constructed to support the U.S. Liquid Metal Fast Breeder Reactor Program. The bulk of the alkali metal (sodium and NaK) has been drained and will be stored onsite prior to final disposition. Residual NaK needed to be removed from the pipes, pumps, heat exchangers, tanks, and vessels in the Fuel Storage Facility (FSF) cooling system. The cooling system was drained in 2004 leaving residual NaK in the pipes and equipment. The estimated residual NaK volume wasmore » 76 liters in the storage tank, 1.9 liters in the expansion tank, and 19-39 liters in the heat transfer loop. The residual NaK volume in the remainder of the system was expected to be very small, consisting of films, droplets, and very small pools. The NaK in the FSF Cooling System was not radiologically contaminated. The portions of the cooling system to be cleaned were divided into four groups: 1. The storage tank, filter, pump, and associated piping; 2. The heat exchanger, expansion tank, and associated piping; 3. Argon supply piping; 4. In-vessel heat transfer loop. The cleaning was contracted to Creative Engineers, Inc. (CEI) and they used their superheated steam process to clean the cooling system. It has been concluded that during the modification activities (prior to CEI coming onsite) to prepare the NaK Cooling System for cleaning, tank T-914 was pressurized relative to the In-Vessel NaK Cooler and NaK was pushed from the tank back into the Cooler and that on November 6, 2005, when the gas purge through the In-Vessel NaK Cooler was increased from 141.6 slm to 283.2 slm, NaK was forced from the In-Vessel NaK Cooler and it contacted water in the vent line and/or scrubber. The gases from the reaction then traveled back through the vent line coating the internal surface of the vent line with NaK and NaK reaction products. The hot gases also exited the scrubber through the stack and due to the temperature of the gas, the hydrogen auto ignited when it mixed with the oxygen in the air. There was no damage to equipment, no injuries, and no significant release of hazardous material. Even though the FSF Cooling System is the only system at FFTF that contains residual NaK, there are lessons to be learned from this event that can be applied to future residual sodium removal activities. The lessons learned are: - Before cleaning equipment containing residual alkali metal the volume of alkali metal in the equipment should be minimized to the extent practical. As much as possible, reconfirm the amount and location of the alkali metal immediately prior to cleaning, especially if additional evolutions have been performed or significant time has passed. This is especially true for small diameter pipe (<20.3 centimeters diameter) that is being cleaned in place since gas flow is more likely to move the alkali metal. Potential confirmation methods could include visual inspection (difficult in all-metal systems), nondestructive examination (e.g., ultrasonic measurements) and repeating previous evolutions used to drain the system. Also, expect to find alkali metal in places it would not reasonably be expected to be. - Staff with an intimate knowledge of the plant equipment and the bulk alkali metal draining activities is critical to being able to confirm the amount and locations of the alkali metal residuals and to safely clean the residuals. - Minimize the potential for movement of alkali metal during cleaning or limit the distance and locations into which alkali metal can move. - Recognize that when working with alkali metal reactions, occasional pops and bangs are to be anticipated. - Pre-plan emergency responses to unplanned events to assure responses planned for an operating reactor are appropriate for the deactivation phase.« less
Experimental study of Siphon breaker about size effect in real scale reactor design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kang, S. H.; Ahn, H. S.; Kim, J. M.
2012-07-01
Rupture accident within the pipe of a nuclear reactor is one of the main causes of a loss of coolant accident (LOCA). Siphon-breaking is a passive method that can prevent a LOCA. In this study, either a line or a hole is used as a siphon-breaker, and the effect of various parameters, such as the siphon-breaker size, pipe rupture point, pipe rupture size, and the presence of an orifice, are investigated using an experimental facility similar in size to a full-scale reactor. (authors)
Douterelo, I; Sharpe, R L; Boxall, J B
2013-02-01
Microbial biofilms formed on the inner-pipe surfaces of drinking water distribution systems (DWDS) can alter drinking water quality, particularly if they are mechanically detached from the pipe wall to the bulk water, such as due to changes in hydraulic conditions. Results are presented here from applying 454 pyrosequencing of the 16S ribosomal RNA (rRNA) gene to investigate the influence of different hydrological regimes on bacterial community structure and to study the potential mobilisation of material from the pipe walls to the network using a full scale, temperature-controlled experimental pipeline facility accurately representative of live DWDS. Analysis of pyrosequencing and water physico-chemical data showed that habitat type (water vs. biofilm) and hydraulic conditions influenced bacterial community structure and composition in our experimental DWDS. Bacterial community composition clearly differed between biofilms and bulk water samples. Gammaproteobacteria and Betaproteobacteria were the most abundant phyla in biofilms while Alphaproteobacteria was predominant in bulk water samples. This suggests that bacteria inhabiting biofilms, predominantly species belonging to genera Pseudomonas, Zooglea and Janthinobacterium, have an enhanced ability to express extracellular polymeric substances to adhere to surfaces and to favour co-aggregation between cells than those found in the bulk water. Highest species richness and diversity were detected in 28 days old biofilms with this being accentuated at highly varied flow conditions. Flushing altered the pipe-wall bacterial community structure but did not completely remove bacteria from the pipe walls, particularly under highly varied flow conditions, suggesting that under these conditions more compact biofilms were generated. This research brings new knowledge regarding the influence of different hydraulic regimes on the composition and structure of bacterial communities within DWDS and the implication that this might have on drinking water quality. Copyright © 2012 Elsevier Ltd. All rights reserved.
30 CFR 75.1905-1 - Diesel fuel piping systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Diesel fuel piping systems. 75.1905-1 Section... Diesel fuel piping systems. (a) Diesel fuel piping systems from the surface must be designed and operated... spillage of fuel and that activates an alarm system. (b) All piping, valves and fittings must be— (1...
Overview of the Liquid Argon Cryogenics for the Short Baseline Neutrino Program (SBN) at Fermilab
DOE Office of Scientific and Technical Information (OSTI.GOV)
Norris, Barry; Bremer, Johan; Chalifour, Michel
2017-01-01
The Short-Baseline Neutrino (SBN) physics program will involve three LAr-TPC detectors located along the Booster Neutrino Beam (BNB) at Fermilab. This new SBN Program will deliver a rich and compelling physics opportunity, including the ability to resolve a class of experimental anomalies in neutrino physics and to perform the most sensitive search to date for sterile neutrinos at the eV mass-scale through both appearance and disappearance oscillation channels. The Program will be composed of an existing and operational detector known as Micro Boone (170 ton LAr mass) plus two new experiments known as the SBN Near Detector (SBND, ~ 260more » ton) and the SBN Far Detector (SBN-FD, ~ 600 tons). Fermilab is now building two new facilities to house the experiments and incorporate all cryogenic and process systems to operate these detectors beginning in the 2018-2019 time frame. The SBN cryogenics are a collaborative effort between Fermilab and CERN. The SBN cryogenic systems for both detectors are composed of several sub-systems: External/Infrastructure (or LN2), Proximity (or LAr), and internal cryogenics. For each detector the External/Infrastructure cryogenics includes the equipment used to store and the cryogenic fluids needed for the operation of the Proximity cryogenics, including the LN2 and LAr storage facilities. The Proximity cryogenics consists of all the systems that take the cryogenic fluids from the external/infrastructure cryogenics and deliver them to the internal at the required pressure, temperature, purity and mass flow rate. It includes the condensers, the LAr and GAr purification systems, the LN2 and LAr phase separators, and the interconnecting piping. The Internal cryogenics is comprised of all the cryogenic equipment located within the cryostats themselves, including the GAr and LAr distribution piping and the piping required to cool down the cryostats and the detectors. These cryogenic systems will be engineered, manufactured, commissioned, and qualified by an international engineering team. This contribution presents the performance, the functional requirements and the modes of operation of the SBN cryogenics, and details the current status of the design, present and future needs.« less
Procedures for testing and evaluating spacecraft-type heat pipes
NASA Astrophysics Data System (ADS)
Tower, L. K.; Kaufman, W. B.
1984-04-01
This report describes part of an effort to develop dependable, cost effective spacecraft thermal control heat pipes. In the program the reliability and performance of 30 commercially available heat pipes were assessed. The pipes comprised 10 groups of varying design, with aluminum and stainless steel as structural materials, and methanol and ammonia as working fluids. The factors studied were noncondensible gas accumulation and heat transfer capability in one g. The present report supplements a brief earlier report by describing in detail the procedures required to conduct a comprehensive evaluation of heat pipes for thermal control. It discusses the test facilities and testing procedures. The manner in which data may be taken for estimating useful life and comparing performance is described. Some of the pitfalls in making such judgments are illustrated. Originator supplied keywords include: heat transfer, and corrosion.
Geothermal-retrofit study for the National Orange Show Facilities in San Bernardino, California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-11-17
The cost and feasibility of retrofitting the National Orange Show Facilities to use geothermal heat instead of natural gas for heating are determined. Because of the limited usage of the smaller facilities the study was limited to the conversion of the six major buildings: Domed, Hobby, Citrus, Auditorium, Restaurant and Commercial. A major problem is that most of the buildings are used on a very limited basis. This drastically reduced the amount of savings that could be used to amortize the retrofit cost. Another problem is that the buildings are spread over a large area and so the below grademore » piping costs were high. Finally, all of the buildings except for the Auditorium have direct gas fired heaters that would require all new terminal heating systems. In order to limit the retrofit cost, the retrofit system was designed to handle less than the peak load. This seemed appropriate because the facility might not even be in operation when a peak load condition occurred. Also, the existing systems could be used to supplement the geothermal system if necessary. The calculated and design peak loads are summarized.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... Extinguishing Systems Foam Extinguishing Systems § 108.475 Piping. (a) Each pipe, valve, and fitting in a foam... pipe, valve, and fitting must have support and protection from damage. (d) Each foam extinguishing... to remove liquid from the system. (e) Piping in a foam extinguishing system must be used only for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Extinguishing Systems Foam Extinguishing Systems § 108.475 Piping. (a) Each pipe, valve, and fitting in a foam... pipe, valve, and fitting must have support and protection from damage. (d) Each foam extinguishing... to remove liquid from the system. (e) Piping in a foam extinguishing system must be used only for...
46 CFR 154.506 - Mechanical expansion joint: Limits in a piping system.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Mechanical expansion joint: Limits in a piping system..., Construction and Equipment Cargo and Process Piping Systems § 154.506 Mechanical expansion joint: Limits in a piping system. Mechanical expansion joints in a piping system outside of a cargo tank: (a) May be...
46 CFR 154.506 - Mechanical expansion joint: Limits in a piping system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Mechanical expansion joint: Limits in a piping system..., Construction and Equipment Cargo and Process Piping Systems § 154.506 Mechanical expansion joint: Limits in a piping system. Mechanical expansion joints in a piping system outside of a cargo tank: (a) May be...
46 CFR 154.506 - Mechanical expansion joint: Limits in a piping system.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Mechanical expansion joint: Limits in a piping system..., Construction and Equipment Cargo and Process Piping Systems § 154.506 Mechanical expansion joint: Limits in a piping system. Mechanical expansion joints in a piping system outside of a cargo tank: (a) May be...
46 CFR 154.506 - Mechanical expansion joint: Limits in a piping system.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Mechanical expansion joint: Limits in a piping system..., Construction and Equipment Cargo and Process Piping Systems § 154.506 Mechanical expansion joint: Limits in a piping system. Mechanical expansion joints in a piping system outside of a cargo tank: (a) May be...
46 CFR 154.506 - Mechanical expansion joint: Limits in a piping system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Mechanical expansion joint: Limits in a piping system..., Construction and Equipment Cargo and Process Piping Systems § 154.506 Mechanical expansion joint: Limits in a piping system. Mechanical expansion joints in a piping system outside of a cargo tank: (a) May be...
Corrosion of iron by iodide-oxidizing bacteria isolated from brine in an iodine production facility.
Wakai, Satoshi; Ito, Kimio; Iino, Takao; Tomoe, Yasuyoshi; Mori, Koji; Harayama, Shigeaki
2014-10-01
Elemental iodine is produced in Japan from underground brine (fossil salt water). Carbon steel pipes in an iodine production facility at Chiba, Japan, for brine conveyance were found to corrode more rapidly than those in other facilities. The corroding activity of iodide-containing brine from the facility was examined by immersing carbon steel coupons in "native" and "filter-sterilized" brine samples. The dissolution of iron from the coupons immersed in native brine was threefold to fourfold higher than that in the filter-sterilized brine. Denaturing gradient gel electrophoresis analyses revealed that iodide-oxidizing bacteria (IOBs) were predominant in the coupon-containing native brine samples. IOBs were also detected in a corrosion deposit on the inner surface of a corroded pipe. These results strongly suggested the involvement of IOBs in the corrosion of the carbon steel pipes. Of the six bacterial strains isolated from a brine sample, four were capable of oxidizing iodide ion (I(-)) into molecular iodine (I(2)), and these strains were further phylogenetically classified into two groups. The iron-corroding activity of each of the isolates from the two groups was examined. Both strains corroded iron in the presence of potassium iodide in a concentration-dependent manner. This is the first report providing direct evidence that IOBs are involved in iron corrosion. Further, possible mechanisms by which IOBs corrode iron are discussed.
Mediterranean report/heated pipeline offloads tankers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
The first heated submarine pipeline in Europe, according to Anonima Petroli Italiana, is now in operation from their Falconara Refinery near Ancona, Italy, to an existing offshore loading facility. The 3850 m long, 24 inch wide line, laid on the seabottom at 3-14 m depths, was built to offload high pour/high viscosity crudes requiring a minimum constant discharge temperature of 45-65 C. Four 3.5 mm heating pipes (three operating and one spare) were stretch-welded to the outside of the line at 45 degree angles to each other; they are heated at about 100 m/m by a parasitic current formed onmore » the pipe while 1500 volt current is passed through a cable inside the pipe. The heating system is equipped with an electric feeding installation, automatic power regulation, and remote sensors applied along the sea line. The heating pipes were protected with a coat of epoxy tar paint, a 50 mm thick and 70 kg/cm dense sprayed-on urethane foam coat, a sheath of butyric elastomer covered with an adhering 3 mm coat of polyethylene, and a concrete coat for protection and weighting. Specially designed water stops were placed at both ends of every line section under the waterproofing. Industria Construzioni Opere Publiche prefabricated the line on shore and laid it from shore.« less
Structural systems for deep sea terminals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rashid, A.
1995-10-01
This paper describes the various structural systems that can be used for loading and unloading crude oil and other by-products by small and large tankers using fixed berths. The overall facility generally consists of a long trestle supporting piping and roadway, loading and unloading platforms supporting loadings arms, metering skid, antenna towers, gangways, surge tanks, etc., breasting dolphins to absorb ships impact, mooring dolphins, and walkways. The paper examines each unit of the facility with the various structural systems applicable with their relative merits and demerits. Some of the structural systems examined are as follows: Use of multiple steel modulesmore » supported by free standing piles versus steel jackets/mini-jackets for loading platforms; Use of concrete platforms; Use of prestress concrete sections versus steel plate girders or steel trusses for trestles; Use of rubblemound causeway in lieu of a trestle in shallow waters; Use of large spare monopile dolphins versus multi-pile steel dolphins.« less
Passage of downstream migrant American eels through an airlift-assisted deep bypass
Haro, Alexander J.; Watten, Barnaby J.; Noreika, John
2016-01-01
Traditional downstream guidance and bypass facilities for anadromous fishes (i.e., surface bypasses, surface guidance structures, and behavioral barriers) have frequently been ineffective for anguillid eels. Because eels typically spend the majority of their time near the bottom in the vicinity of intake structures, deep bypass structures with entrances near the bottom hold promise for increased effectiveness, thereby aiding in the recovery of this important species. A new design of a deep bypass system that uses airlift technology (the Conte Airlift Bypass) to induce flow in a bypass pipe was tested in a simulated intake entrance environment under controlled laboratory conditions. Water velocities of 0.9–1.5 m s−1 could be generated at the bypass entrance (opening with 0.073 m2 area), with corresponding flows through the bypass pipe of 0.07–0.11 m3 s−1. Gas saturation and hydrostatic pressure within the bypass pipe did not vary appreciably from a control (no air) condition under tested airflows. Migratory silver-phase American eels (Anguilla rostrata) tested during dark conditions readily located, entered, and passed through the bypass; initial avoidance rates (eels approaching but not entering the bypass entrance) were lower at higher entrance velocities. Eels that investigated the bypass pipe entrance tended to enter headfirst, but those that then exited the pipe upstream did so more frequently at lower entrance velocities. Eels appeared to swim against the flow while being transported downstream through the pipe; median transit times through the bypass for each test velocity ranged from 5.8 to 12.2 s, with transit time decreasing with increasing entrance velocity. Eels did not show strong avoidance of the vertical section of the pipe which contained injected air. No mortality or injury of bypassed eels was observed, and individual eels repeatedly passed through the bypass at rates of up to 40 passes per hour, suggesting that individuals do not avoid repeated entrainment through the bypass. Airlift technology appears to be a viable method for increasing passage effectiveness for American eels through a deep bypass system.
Spaceborne power systems preference analyses. Volume 2: Decision analysis
NASA Technical Reports Server (NTRS)
Smith, J. H.; Feinberg, A.; Miles, R. F., Jr.
1985-01-01
Sixteen alternative spaceborne nuclear power system concepts were ranked using multiattribute decision analysis. The purpose of the ranking was to identify promising concepts for further technology development and the issues associated with such development. Four groups were interviewed to obtain preference. The four groups were: safety, systems definition and design, technology assessment, and mission analysis. The highest ranked systems were the heat-pipe thermoelectric systems, heat-pipe Stirling, in-core thermionic, and liquid-metal thermoelectric systems. The next group contained the liquid-metal Stirling, heat-pipe Alkali Metal Thermoelectric Converter (AMTEC), heat-pipe Brayton, liquid-metal out-of-core thermionic, and heat-pipe Rankine systems. The least preferred systems were the liquid-metal AMTEC, heat-pipe thermophotovoltaic, liquid-metal Brayton and Rankine, and gas-cooled Brayton. The three nonheat-pipe technologies selected matched the top three nonheat-pipe systems ranked by this study.
2015-06-01
sediment control plan during project implementation would be expected to minimize any adverse effects on resident fish species during construction. In... Effective August 8, 2007, under the authority of the Endangered Species Act of 1973, as amended, the U.S. Fish and Wildlife Service (Service) removed...of storm sewer pipe and 122 manholes of the airfield stormwater drainage network. Summary of Anticipated Environmental Effects Associated with the
Macy, Jamie P.; Sharrow, David; Unema, Joel
2013-01-01
Pipe Spring National Monument in northern Arizona contains historically significant springs. The groundwater source of these springs is the same aquifer that presently is an important source of drinking water for the Pipe Spring National Monument facilities, the Kaibab Paiute Tribe, and the community of Moccasin. The Kaibab Paiute Tribe monitored lead concentrations from 2004 to 2009; some of the analytical results exceeded the U.S. Environmental Protection Agency action level for treatment technique for lead of 15 parts per billion. The National Park Service and the Kaibab Paiute Tribe were concerned that the local groundwater system that provides the domestic water supply might be contaminated with lead. Lead concentrations in water samples collected by the U.S. Geological Survey from three springs, five wells, two water storage tanks, and one faucet were less than the U.S. Environmental Protection Agency action level for treatment technique. Lead concentrations of rock samples representative of the rock units in which the local groundwater resides were less than 22 parts per million.
Description of Liquid Nitrogen Experimental Test Facility
NASA Technical Reports Server (NTRS)
Jurns, John M.; Jacobs, Richard E.; Saiyed, Naseem H.
1991-01-01
The Liquid Nitrogen Test Facility is a unique test facility for ground-based liquid nitrogen experimentation. The test rig consists of an insulated tank of approximately 12.5 cubic ft in volume, which is supplied with liquid nitrogen from a 300 gal dewar via a vacuum jacketed piping system. The test tank is fitted with pressure and temperature measuring instrumentation, and with two view ports which allow visual observation of test conditions. To demonstrate the capabilities of the facility, the initial test program is briefly described. The objective of the test program is to measure the condensation rate by injecting liquid nitrogen as a subcooled spray into the ullage of a tank 50 percent full of liquid nitrogen at saturated conditions. The condensation rate of the nitrogen vapor on the subcooled spray can be analytically modeled, and results validated and corrected by experimentally measuring the vapor condensation on liquid sprays.
Description of liquid nitrogen experimental test facility
NASA Technical Reports Server (NTRS)
Jurns, J. M.; Jacobs, R. E.; Saiyed, N. H.
1992-01-01
The Liquid Nitrogen Test Facility is a unique test facility for ground-based liquid nitrogen experimentation. The test rig consists of an insulated tank of approximately 12.5 cubic ft in volume, which is supplied with liquid nitrogen from a 300 gal dewar via a vacuum jacketed piping system. The test tank is fitted with pressure and temperature measuring instrumentation, and with two view ports which allow visual observation of test conditions. To demonstrate the capabilities of the facility, the initial test program is briefly described. The objective of the test program is to measure the condensation rate by injecting liquid nitrogen as a subcooled spray into the ullage of a tank 50 percent full of liquid nitrogen at saturated conditions. The condensation rate of the nitrogen vapor on the subcooled spray can be analytically modeled, and results validated and corrected by experimentally measuring the vapor condensation on liquid sprays.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
.... SUPPLEMENTARY INFORMATION: Scope of the Orders Japan The products covered by this order include certain... designing the piping system: (1) Corrosion of the piping system will occur if material other than stainless... designing the piping system: (1) Corrosion of the piping system will occur if material other than stainless...
1979-11-01
oilhead to final terminals in Europe. North America. and Japan The oil wofis themselves provide a cluster of obvious targets, as do the collecting ...systems which bring the oil from the fields to the local terminal facilities The collecting system is made up of pumps and pipes The local terminal...but the most important targets are the oil terminals, since it is at these points that the oil from various fields is collected into one place for
Application of displacement monitoring system on high temperature steam pipe
NASA Astrophysics Data System (ADS)
Ghaffar, M. H. A.; Husin, S.; Baek, J. E.
2017-10-01
High-energy piping systems of power plants such as Main Steam (MS) pipe or Hot Reheat (HR) pipe are operating at high temperature and high pressure at base and cyclic loads. In the event of transient condition, a pipe can be deflected dramatically and caused high stress in the pipe, yielding to failure of the piping system. Periodic monitoring and walk down can identify abnormalities but limitations exist in the standard walk down practice. This paper provides a study of pipe displacement monitoring on MS pipe of coal-fired power plant to continuously capture the pipe movement behaviour at different load using 3-Dimensional Displacement Measuring System (3DDMS). The displacement trending at Location 5 and 6 (north and south) demonstrated pipes displace less than 25% to that of design movement. It was determined from synchronisation analysis that Location 7 (north) and Location 8 (south) pipe actual movement difference has exceeded the design movement difference. Visual survey at specified locations with significant displacement trending reveals issues of hydraulic snubber and piping interferences. The study demonstrated that the displacement monitoring is able to capture pipe movement at all time and allows engineer to monitor pipe movement behaviour, aids in identifying issue early for remedy action.
DOE Office of Scientific and Technical Information (OSTI.GOV)
March-Leuba, Jose A; Uckan, Taner; Gunning, John E
2010-01-01
The expected increased demand in fuel for nuclear power plants, combined with the fact that a significant portion of the current supply from the blend down of weapons-source material will soon be coming to an end, has led to the need for new sources of enriched uranium for nuclear fuel. As a result, a number of countries have announced plans, or are currently building, gaseous centrifuge enrichment plants (GCEPs) to supply this material. GCEPs have the potential to produce uranium at enrichments above the level necessary for nuclear fuel purposes-enrichments that make the uranium potentially usable for nuclear weapons. Asmore » a result, there is a critical need to monitor these facilities to ensure that nuclear material is not inappropriately enriched or diverted for unintended use. Significant advances have been made in instrument capability since the current International Atomic Energy Agency (IAEA) monitoring methods were developed. In numerous cases, advances have been made in other fields that have the potential, with modest development, to be applied in safeguards applications at enrichment facilities. A particular example of one of these advances is the flow and enrichment monitor (FEMO). (See Gunning, J. E. et al., 'FEMO: A Flow and Enrichment Monitor for Verifying Compliance with International Safeguards Requirements at a Gas Centrifuge Enrichment Facility,' Proceedings of the 8th International Conference on Facility Operations - Safeguards Interface. Portland, Oregon, March 30-April 4th, 2008.) The FEMO is a conceptual instrument capable of continuously measuring, unattended, the enrichment and mass flow of {sup 235}U in pipes at a GCEP, and consequently increase the probability that the potential production of HEU and/or diversion of fissile material will be detected. The FEMO requires no piping penetrations and can be installed on pipes containing the flow of uranium hexafluoride (UF{sub 6}) at a GCEP. This FEMO consists of separate parts, a flow monitor (FM) and an enrichment monitor (EM). Development of the FM is primarily the responsibility of Oak Ridge National Laboratory, and development of the EM is primarily the responsibility of Los Alamos National Laboratory. The FM will measure {sup 235}U mass flow rate by combining information from measuring the UF{sub 6} volumetric flow rate and the {sup 235}U density. The UF{sub 6} flow rate will be measured using characteristics of the process pumps used in product and tail UF{sub 6} header process lines of many GCEPs, and the {sup 235}U density will be measured using commercially available sodium iodide (NaI) gamma ray scintillation detectors. This report describes the calibration of the portion of the FM that measures the {sup 235}U density. Research has been performed to define a methodology and collect data necessary to perform this calibration without the need for plant declarations. The {sup 235}U density detector is a commercially available system (GammaRad made by Amptek, www.amptek.com) that contains the NaI crystal, photomultiplier tube, signal conditioning electronics, and a multichannel analyzer (MCA). Measurements were made with the detector system installed near four {sup 235}U sources. Two of the sources were made of solid uranium, and the other two were in the form of UF{sub 6} gas in aluminum piping. One of the UF{sub 6} gas sources was located at ORNL and the other at LANL. The ORNL source consisted of two pipe sections (schedule 40 aluminum pipe of 4-inch and 8-inch outside diameter) with 5.36% {sup 235}U enrichment, and the LANL source was a 4-inch schedule 40 aluminum pipe with 3.3% {sup 235}U enrichment. The configurations of the detector on these test sources, as well as on long straight pipe configurations expected to exist at GCEPs, were modeled using the computer code MCNP. The results of the MCNP calculations were used to define geometric correction factors between the test source and the GCEP application. Using these geometric correction factors, the experimental 186 keV counts in the test geometry were extrapolated to the expected GCEP geometry, and calibration curves were developed. A unique method to analyze the measurement was also developed that separated the detector spectrum into the five detectable decay gamma rays emitted by {sup 235}U in the 120 to 200 keV energy range. This analysis facilitated the assignment of a consistent value for the detector counts originating from {sup 235}U decays at 186 keV. This value is also more accurate because it includes the counts from gamma energies other than 186 keV, which results in increased counting statistics for the same measurement time. The 186 keV counts expected as a function of pressure and enrichment are presented in the body of this report. The main result of this research is a calibration factor for 4-inch and 8-inch schedule 40 aluminum pipes. For 4-inch pipes, the {sup 235}U density is 0.62 {sup 235}U g/m{sup 3} per each measured 186 keV count.« less
Tests of cryogenic pigs for use in liquefied gas pipelines
NASA Astrophysics Data System (ADS)
Hipple, D. L.; Oneal, W. C.
1982-09-01
Pipeline pigs are a key element in the design of a proposed spill test facility whose purpose is to evaluate the hazards of large spills of liquefied gaseous fuels (LGFs). A long pipe runs from the LGF storage tanks to the spill point; to produce a rapid spill, the pipe is filled with LGF and a pig will be pneumatically driven through the pipe to force out the LGF quickly and cleanly. Several pig designs were tested in a 6 inch diameter, 420 foot long pipe to evaluate their performance at liquid-nitrogen temperature and compare it with their performance at ambient temperature. For each test, the pig was placed in one end of the pipe and either water or liquid nitrogen was put into the pipe in front of the pig. Then pressurized drive gas, either nitrogen or helium, was admitted to the pipe behind the pig to push the pig and the fluid ahead of it out the exit nozzle. For some tests, the drive gas supply was shut off when the pig was part way through the pipe as a method of velocity control; in these cases, the pressurized gas trapped behind the pig continued to expand until it pushed the pig the remaining distance out of the pipe.
Breckinridge Project, initial effort
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-01-01
Report V, Volume 4 provides descriptions, data, and drawings pertaining to Instrument and Plant Air Systems (Plant 36), Telecommunication Systems (Plant 37), Inert Gas Systems (Plant 38), Purge and Flush Oil Systems (Plant 39), Site Development and Roads (Plant 40), Buildings (Plant 41), Solid Waste Management (Plant 42), and Landfill (Plant 44). Instrument and Plant Air Systems (Plant 36) includes all equipment and piping necessary to supply instrument and utility air to the process plants and offsite facilities. Telecommunication Systems (Plant 37) includes the equipment and wiring for: communication throughout the facility; communication between plant data processing systems and offsitemore » computing facilities; and communication with transportation carriers. Inert Gas Systems (Plant 38) provides high purity and low purity nitrogen streams for plant startup and normal operation. Purge and Flush Oil Systems (Plant 39) provides purge and flush oils to various plants. Site Development and Roads (Plant 40) provides site leveling, the addition of roads, fencing, and drainage, and the placement of fills, pilings, footings, and foundations for plants. Buildings (Plant 41) provides buildings for equipment and for personnel, including utilities, lighting, sanitary facilities, heating, air conditioning, and ventilation. Solid Waste Management (Plant 42) identifies, characterizes, segregates, and transports the various types of solid wastes to either Landfill (Plant 44) or outside disposal sites. Landfill (Plant 44) provides disposal of both nonhazardous and hazardous solid wastes. Information is included (as applicable) for each of the eight plants described.« less
Nearshore Pipeline Installation Methods.
1981-08-01
inches b) Pipe, materials of construction: fully rigid, semi-rigid, flexible c) Pipeline length, maximum 2 miles d) Pipeline design life , minimum 15...common to their operations. Permanent facilities are specified in the Statement of Work. There- fore, a minimum design life of 15 years is chosen, which...makes the pipe leakproof and resists corrosion and abrasion. 5) Interlocked Z-shaped steel or stainless steel carcass - resists internal and external
Rotating optical geometry sensor for inner pipe-surface reconstruction
NASA Astrophysics Data System (ADS)
Ritter, Moritz; Frey, Christan W.
2010-01-01
The inspection of sewer or fresh water pipes is usually carried out by a remotely controlled inspection vehicle equipped with a high resolution camera and a lightning system. This operator-oriented approach based on offline analysis of the recorded images is highly subjective and prone to errors. Beside the subjective classification of pipe defects through the operator standard closed circuit television (CCTV) technology is not suitable for detecting geometrical deformations resulting from e.g. structural mechanical weakness of the pipe, corrosion of e.g. cast-iron material or sedimentations. At Fraunhofer Institute of Optronics, System Technologies and Image Exploitation (IOSB) in Karlsruhe, Germany, a new Rotating Optical Geometry Sensor (ROGS) for pipe inspection has been developed which is capable of measuring the inner pipe geometry very precisely over the whole pipe length. This paper describes the developed ROGS system and the online adaption strategy for choosing the optimal system parameters. These parameters are the rotation and traveling speed dependent from the pipe diameter. Furthermore, a practicable calibration methodology is presented which guarantees an identification of the several internal sensor parameters. ROGS has been integrated in two different systems: A rod based system for small fresh water pipes and a standard inspection vehicle based system for large sewer Pipes. These systems have been successfully applied to different pipe systems. With this measurement method the geometric information can be used efficiently for an objective repeatable quality evaluation. Results and experiences in the area of fresh water pipe inspection will be presented.
46 CFR 119.510 - Bilge piping system.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Bilge piping system. 119.510 Section 119.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... Ballast Systems § 119.510 Bilge piping system. A vessel must be provided with a piping system that meets...
46 CFR 119.510 - Bilge piping system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Bilge piping system. 119.510 Section 119.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... Ballast Systems § 119.510 Bilge piping system. A vessel must be provided with a piping system that meets...
33 CFR 158.250 - Standard discharge connection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...
33 CFR 158.250 - Standard discharge connection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...
33 CFR 158.250 - Standard discharge connection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...
33 CFR 158.250 - Standard discharge connection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...
33 CFR 158.250 - Standard discharge connection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...
Groen, Reinou S; Kamara, Thaim B; Dixon-Cole, Richmond; Kwon, Steven; Kingham, T Peter; Kushner, Adam L
2012-08-01
A first step toward improving surgical care in many low and middle income countries is to document the need. To facilitate the collection and analysis of surgical capacity data and measure changes over time, Surgeons OverSeas (SOS) developed a tool and index based on personnel, infrastructure, procedures, equipment, and supplies (PIPES). A follow-up assessment of 10 government hospitals in Sierra Leone was completed 42 months after an initial survey in 2008 using the PIPES tool. An index based on number of operating rooms, personnel, infrastructure, procedures, equipment, and supplies was calculated. An index was also calculated, using the 2008 data for comparison. Most hospitals demonstrated an increased index that correlated with site visits that verified improved conditions. Connaught Hospital in Sierra Leone had the highest score (9.2), consistent with its being the best equipped and staffed Ministry of Health and Sanitation facility. Makeni District Hospital had the greatest increase, from 3.8 to 7.5, consistent with a newly constructed facility. The PIPES tool was easily administered at hospitals in Sierra Leone and an index was found useful. Surgical capacity in Sierra Leone improved between 2008 and 2011, as demonstrated by an increase in the overall PIPES indices.
46 CFR 154.500 - Cargo and process piping standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Equipment Cargo and Process Piping Systems § 154.500 Cargo and process piping standards. The cargo liquid and vapor piping and process piping systems must meet the requirements in §§ 154.503 through 154.562... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo and process piping standards. 154.500 Section 154...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
46 CFR 56.01-5 - Adoption of ASME B31.1 for power piping, and other standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENGINEERING PIPING SYSTEMS AND APPURTENANCES General § 56.01-5 Adoption of ASME B31.1 for power piping, and other standards. (a) Piping systems for ships and barges must be designed, constructed, and inspected in... subchapter. See 46 CFR 56.60-1(b) for the other adopted commercial standards applicable to piping systems...
A Corrosion Risk Assessment Model for Underground Piping
NASA Technical Reports Server (NTRS)
Datta, Koushik; Fraser, Douglas R.
2009-01-01
The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Piping subject to more than 1,034 kPa (150 psig) in non... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa (150 psig) in non-vital systems. Piping subject to more than 1034 kPa (150 psig) in a non-vital system...
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Piping subject to more than 1,034 kPa (150 psig) in non... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa (150 psig) in non-vital systems. Piping subject to more than 1034 kPa (150 psig) in a non-vital system...
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Piping subject to more than 1,034 kPa (150 psig) in non... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa (150 psig) in non-vital systems. Piping subject to more than 1034 kPa (150 psig) in a non-vital system...
NASA Technical Reports Server (NTRS)
Sanzi, James L.
2007-01-01
Titanium-water heat pipes are being investigated for use in heat rejection systems for lunar and Mars fission surface power systems. Heat pipes provide an efficient and reliable means to transfer heat to a radiator heat rejection system. NASA Glenn Research Center requisitioned nine titanium water heat pipes from three vendors. Each vendor supplied three heat pipes 1.25 cm diameter by 1.1 meter long with each vendor selecting a different wick design. Each of the three heat pipes is slightly different in construction. Additional specifications for the heat pipes included 500 K nominal operating temperature, light weight, and freeze tolerance. The heat pipes were performance tested gravity-aided, in the horizontal position and at elevations against gravity at 450 and 500 K. Performance of the three heat pipes is compared. The heat pipe data will be used to verify models of heat pipe radiators that will be used in future space exploration missions.
NASA Technical Reports Server (NTRS)
Sanzi, James L.
2007-01-01
Titanium - water heat pipes are being investigated for use in heat rejection systems for lunar and Mars fission surface power systems. Heat pipes provide an efficient and reliable means to transfer heat to a radiator heat rejection system. NASA Glenn Research Center requisitioned nine titanium water heat pipes from three vendors. Each vendor supplied three heat pipes 1.25 cm diameter by 1.1 meter long with each vendor selecting a different wick design. Each of the three heat pipes is slightly different in construction. Additional specifications for the heat pipes included 500 K nominal operating temperature, light weight, and freeze tolerance. The heat pipes were performance tested gravity-aided, in the horizontal position and at elevations against gravity at 450 K and 500 K. Performance of the three heat pipes is compared. The heat pipe data will be used to verify models of heat pipe radiators that will be used in future space exploration missions.
System design description of forced-convection molten-salt corrosion loops MSR-FCL-3 and MSR-FCL-4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huntley, W.R.; Silverman, M.D.
1976-11-01
Molten-salt corrosion loops MSR-FCL-3 and MSR-FCL-4 are high-temperature test facilities designed to evaluate corrosion and mass transfer of modified Hastelloy N alloys for future use in Molten-Salt Breeder Reactors. Salt is circulated by a centrifugal sump pump to evaluate material compatibility with LiF-BeF/sub 2/-ThF/sub 4/-UF/sub 4/ fuel salt at velocities up to 6 m/s (20 fps) and at salt temperatures from 566 to 705/sup 0/C (1050 to 1300/sup 0/F). The report presents the design description of the various components and systems that make up each corrosion facility, such as the salt pump, corrosion specimens, salt piping, main heaters, salt coolers,more » salt sampling equipment, and helium cover-gas system, etc. The electrical systems and instrumentation and controls are described, and operational procedures, system limitations, and maintenance philosophy are discussed.« less
Determination of ac conductor and pipe loss in pipe-type cable systems. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silver, D.A.; Seman, G.W.
1982-02-01
The results are presented of investigations into the determination of the ac/dc resistance ratios of high and extra high voltage pipe-type cables with conventional and large size segmental conductors in carbon steel, stainless steel and aluminum pipes in three cable per pipe and single cable per pipe configurations. The measurements included 115 through 765 kV cables with copper, enamel coated copper, and aluminum conductors in sizes of 2000 kcmil (1015 mm/sup 2/), 3250 kcmil (1650 mm/sup 2/), and 3500 kcmil (1776 mm/sup 2/). Calculations using presently available techniques were employed to provide correlation between measured and calculated values in bothmore » magnetic and non-magnetic pipes. In addition, a number of new techniques in conductor construction, pipe material and pipe liners and cable wraps were investigated as means of decreasing the ac/dc resistance ratios of pipe-type cables. Finally, the various systems studied were compared on the basis of system MVA rating and by evaluation of installed and overall operating costs as compared to conventional three cable per pipe systems installed in carbon steel pipes.« less
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa... Standards Institute (ANSI) B 31.1 “American National Standard Code for Pressure Piping, Power Piping,” or...
46 CFR 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 PASSENGERS MACHINERY INSTALLATION Piping Systems § 119.715 Piping subject to more than 1,034 kPa... Standards Institute (ANSI) B 31.1 “American National Standard Code for Pressure Piping, Power Piping,” or...
30 CFR 75.1905-1 - Diesel fuel piping systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Diesel fuel piping systems. 75.1905-1 Section... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1905-1 Diesel fuel piping systems. (a) Diesel fuel piping systems from the surface must be designed and operated...
NASA Astrophysics Data System (ADS)
Kim, Shin-Hyung; Ruy, Won-Sun; Jang, Beom Seon
2013-09-01
An automatic pipe routing system is proposed and implemented. Generally, the pipe routing design as a part of the shipbuilding process requires a considerable number of man hours due to the complexity which comes from physical and operational constraints and the crucial influence on outfitting construction productivity. Therefore, the automation of pipe routing design operations and processes has always been one of the most important goals for improvements in shipbuilding design. The proposed system is applied to a pipe routing design in the engine room space of a commercial ship. The effectiveness of this system is verified as a reasonable form of support for pipe routing design jobs. The automatic routing result of this system can serve as a good basis model in the initial stages of pipe routing design, allowing the designer to reduce their design lead time significantly. As a result, the design productivity overall can be improved with this automatic pipe routing system
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
Helium recovery and purification at CHMFL
NASA Astrophysics Data System (ADS)
Li, J.; Meng, Q.; Ouyang, Z.; Shi, L.; Ai, X.; Chen, X.
2017-02-01
Currently, rising demand and declining reserves of helium have led to dramatic increases in the helium price. The High Magnetic Field Laboratory of Chinese Academy of Sciences (CHMFL) has made efforts since its foundation to increase the percentage of helium recovered. The piping network connects all the helium experimental facilities to the recovery system, and even exhaust ports of pressure relief valves and vacuum pumps are also connected. In each year, about 30,000 cubic meters helium gas is recovered. The recovery gas is purified, liquefied and supplied to the users again. This paper will provide details about the helium recovery and purification system at CHMFL, including system flowchart, components, problems and solutions.
Effect of Structure Factor on High-Temperature Ductility of Pipe Steels
NASA Astrophysics Data System (ADS)
Kolbasnikov, N. G.; Matveev, M. A.; Mishnev, P. A.
2016-05-01
Effects of various factors such as the grain size, the morphology of nonmetallic inclusions, and joint microalloying with boron and titanium on the high-temperature ductility of pipe steels are studied. Physical modeling of the conditions of cooling of the skin of a continuous-cast preform in the zone of secondary cooling in a Gleeble facility is performed. Technical recommendations are given for raising the hot ductility of steels under industrial conditions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Pipe sizes and discharge rates for enclosed ventilation... Systems Fixed Carbon Dioxide Fire Extinguishing Systems § 108.437 Pipe sizes and discharge rates for enclosed ventilation systems for rotating electrical equipment. (a) The minimum pipe size for the initial...
40 CFR 86.312-79 - Dynamometer and engine equipment specifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... system must have a single tail pipe. For engines designed for a dual exhaust system, a standard or... standard exhaust system components downstream of the “Y” pipe. For systems with the “Y” pipe upstream of... exhaust pipe downstream of the muffler(s) and from 3 to 20 feet downstream from the exhaust manifold...
46 CFR 50.05-5 - Existing boilers, pressure vessels or piping systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Existing boilers, pressure vessels or piping systems. 50... ENGINEERING GENERAL PROVISIONS Application § 50.05-5 Existing boilers, pressure vessels or piping systems. (a) Whenever doubt exists as to the safety of an existing boiler, pressure vessel, or piping system, the marine...
Research on the ITOC based scheduling system for ship piping production
NASA Astrophysics Data System (ADS)
Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro
2010-12-01
Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.
1983-08-25
currently available Westinghouse CAE capabilities include plant layout, piping design, piping analysis , support/hanger design, and drawing preparation. The...considerations involved with the design and analysis of piping and support systems and space management in nuclear power plants are very similar to...piping analysis system can obtain input defini- tion data either from the plant modeling system or from piping drawings (for systems not designed using
Berendes, David M; Sumner, Trent A; Brown, Joe M
2017-03-07
Although global access to sanitation is increasing, safe management of fecal waste is a rapidly growing challenge in low- and middle-income countries (LMICs). The goal of this study was to evaluate the current need for fecal sludge management (FSM) in LMICs by region, urban/rural status, and wealth. Recent Demographic and Health Survey data from 58 countries (847 685 surveys) were used to classify households by sanitation facility (facilities needing FSM, sewered facilities, ecological sanitation/other, or no facilities). Onsite piped water infrastructure was quantified to approximate need for wastewater management and downstream treatment. Over all surveyed nations, 63% of households used facilities requiring FSM, totaling approximately 1.8 billion people. Rural areas had similar proportions of toilets requiring FSM as urban areas. FSM needs scaled inversely with wealth: in the poorest quintile, households' sanitation facilities were almost 170 times more likely to require FSM (vs sewerage) than in the richest quintile. About one out of five households needing FSM had onsite piped water infrastructure, indicating domestic or reticulated wastewater infrastructure may be required if lacking for safe management of aqueous waste streams. FSM strategies must be included in future sanitation investment to achieve safe management of fecal wastes and protect public health.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... the compliance date by which facilities must address milk and milk product containers, associated... facility must comply with the SPCC requirements for these milk and milk product containers is delayed one... containers, associated piping and appurtenances, or as specified by a rule that otherwise establishes a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
... new ``y'' pipe intake off the existing 10-inch diameter water supply pipeline; (2) a new 12-foot-long... water supply pipeline; and (5) appurtenant facilities. The proposed project would have an estimated... 22 kW Orchard City Water Treatment Plant Hydroelectric Project would utilize Orchard City's water...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less
Maccarini, Alessandro; Wetter, Michael; Afshari, Alireza; ...
2016-10-31
This paper analyzes the performance of a novel two-pipe system that operates one water loop to simultaneously provide space heating and cooling with a water supply temperature of around 22 °C. To analyze the energy performance of the system, a simulation-based research was conducted. The two-pipe system was modelled using the equation-based Modelica modeling language in Dymola. A typical office building model was considered as the case study. Simulations were run for two construction sets of the building envelope and two conditions related to inter-zone air flows. To calculate energy savings, a conventional four-pipe system was modelled and used formore » comparison. The conventional system presented two separated water loops for heating and cooling with supply temperatures of 45 °C and 14 °C, respectively. Simulation results showed that the two-pipe system was able to use less energy than the four-pipe system thanks to three effects: useful heat transfer from warm to cold zones, higher free cooling potential and higher efficiency of the heat pump. In particular, the two-pipe system used approximately between 12% and 18% less total annual primary energy than the four-pipe system, depending on the simulation case considered.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maccarini, Alessandro; Wetter, Michael; Afshari, Alireza
This paper analyzes the performance of a novel two-pipe system that operates one water loop to simultaneously provide space heating and cooling with a water supply temperature of around 22 °C. To analyze the energy performance of the system, a simulation-based research was conducted. The two-pipe system was modelled using the equation-based Modelica modeling language in Dymola. A typical office building model was considered as the case study. Simulations were run for two construction sets of the building envelope and two conditions related to inter-zone air flows. To calculate energy savings, a conventional four-pipe system was modelled and used formore » comparison. The conventional system presented two separated water loops for heating and cooling with supply temperatures of 45 °C and 14 °C, respectively. Simulation results showed that the two-pipe system was able to use less energy than the four-pipe system thanks to three effects: useful heat transfer from warm to cold zones, higher free cooling potential and higher efficiency of the heat pump. In particular, the two-pipe system used approximately between 12% and 18% less total annual primary energy than the four-pipe system, depending on the simulation case considered.« less
In situ conversion process utilizing a closed loop heating system
Sandberg, Chester Ledlie [Palo Alto, CA; Fowler, Thomas David [Houston, TX; Vinegar, Harold J [Bellaire, TX; Schoeber, Willen Jan Antoon Henri
2009-08-18
An in situ conversion system for producing hydrocarbons from a subsurface formation is described. The system includes a plurality of u-shaped wellbores in the formation. Piping is positioned in at least two of the u-shaped wellbores. A fluid circulation system is coupled to the piping. The fluid circulation system is configured to circulate hot heat transfer fluid through at least a portion of the piping to form at least one heated portion of the formation. An electrical power supply is configured to provide electrical current to at least a portion of the piping located below an overburden in the formation to resistively heat at least a portion of the piping. Heat transfers from the piping to the formation.
Underground pipeline laying using the pipe-in-pipe system
NASA Astrophysics Data System (ADS)
Antropova, N.; Krets, V.; Pavlov, M.
2016-09-01
The problems of resource saving and environmental safety during the installation and operation of the underwater crossings are always relevant. The paper describes the existing methods of trenchless pipeline technology, the structure of multi-channel pipelines, the types of supporting and guiding systems. The rational design is suggested for the pipe-in-pipe system. The finite element model is presented for the most dangerous sections of the inner pipes, the optimum distance is detected between the roller supports.
PBF Cooling Tower. View from highbay roof of Reactor Building ...
PBF Cooling Tower. View from high-bay roof of Reactor Building (PER-620). Camera faces northwest. East louvered face has been installed. Inlet pipes protrude from fan deck. Two redwood vents under construction at top. Note piping, control, and power lines at sub-grade level in trench leading to Reactor Building. Photographer: Kirsh. Date: June 6, 1969. INEEL negative no. 69-3466 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Innovative Corrosion-Resistant Coatings for Heat Distribution Piping at Fort Jackson
2007-06-01
installations are served by district heat distribution sys- tems (HDSs) that provide space heating and hot water to the facilities. HDSs are large, complex...corrosive to exposed steel. Furthermore, water tends to infiltrate the manhole from outside or though pinhole leaks in pipes. When water collects in the man...energized. A typical HDS services a number of installa- tion customers all year for both space heating and domestic hot water . Scheduled maintenance is
Heat Pipes and Heat Rejection Component Testing at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Sanzi, James L.; Jaworske, Donald A.
2012-01-01
Titanium-water heat pipes are being evaluated for use in the heat rejection system for space fission power systems. The heat rejection syst em currently comprises heat pipes with a graphite saddle and a composite fin. The heat input is a pumped water loop from the cooling of the power conversion system. The National Aeronautics and Space Administration has been life testing titanium-water heat pipes as well as eval uating several heat pipe radiator designs. The testing includes thermal modeling and verification of model, material compatibility, frozen startup of heat pipe radiators, and simulating low-gravity environments. Future thermal testing of titanium-water heat pipes includes low-g ravity testing of thermosyphons, radiation testing of heat pipes and fin materials, water pump performance testing, as well as Small Busine ss Innovation Research funded deliverable prototype radiator panels.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid... installation of associated aboveground mainline block valves; and the use of access roads and pipe storage and... Permit authorizing the construction, connection, operation, and maintenance of the Cross Border Facility...
NASA Astrophysics Data System (ADS)
Al-Shukri, H.; Eyuboglu, S.; Mahdi, H.
2005-12-01
Many geophysical techniques have been suggested as candidates for detecting water leakage in water distribution system, including ground penetrating radar (GPR), acoustic devices, and gas sampling devices. A series of laboratory experiments were conducted to determine the validity and effectiveness of GPR in detecting water leakage in metal and plastic PVC pipes. The goal was to derive a practical and robust procedure for detecting such leakage. Initially, prototype laboratory experiments were designed to simulate leaks in both PVC and metal pipe. The experiments were very well controlled and results obtained indicate that GPR is effective in detecting subsurface water leaks. This was followed by an outdoor life size experiments. 50 feet by 30 feet by 5 feet test bed was constructed using local soil and commercial water distribution pipes. A 400 MHz antenna was used to collect three-dimensional GPR data as a function of time for a number of experiments using different type of pipes. Advanced imaging and visualization technology was used to further analyze the data. The UALR Virtual Reality Center CAVE facilities were utilized to accomplish this test. Results obtained indicate that GPR is effective in detecting subsurface water leaks in both pipes. Synthetic models of the GPR signals based on Finite Difference Time Domain Method (FDTD) were built to help select an appropriate equipment configuration (frequency band, type of antenna, and real-time imaging software) prior to data acquisition. The simulation software was used to determine the near-field radiation characteristics of the GPR antenna. Different experimental models were adapted for which observational GPR data was previously collected. Matlab regression analysis was used to generate the incident waves for each model to ensure highly accurate and controlled experiments.
Tree root intrusion in sewer systems: A review of extent and costs
T.B. Randrup; E.G. McPherson; L.R. Costello
2001-01-01
Interference between trees and sewer systems is likely to occur in old systems and in cracked pipes. Factors that contribute to damage include old pipes with joints, shallow pipes, small-dimension pipes, and fast-growing tree species. Because roots are reported to cause >50% of all sewer blockages, costs associated with root removal from sewers is substantial. In...
Spatial optimization for decentralized non-potable water reuse
NASA Astrophysics Data System (ADS)
Kavvada, Olga; Nelson, Kara L.; Horvath, Arpad
2018-06-01
Decentralization has the potential to reduce the scale of the piped distribution network needed to enable non-potable water reuse (NPR) in urban areas by producing recycled water closer to its point of use. However, tradeoffs exist between the economies of scale of treatment facilities and the size of the conveyance infrastructure, including energy for upgradient distribution of recycled water. To adequately capture the impacts from distribution pipes and pumping requirements, site-specific conditions must be accounted for. In this study, a generalized framework (a heuristic modeling approach using geospatial algorithms) is developed that estimates the financial cost, the energy use, and the greenhouse gas emissions associated with NPR (for toilet flushing) as a function of scale of treatment and conveyance networks with the goal of determining the optimal degree of decentralization. A decision-support platform is developed to assess and visualize NPR system designs considering topography, economies of scale, and building size. The platform can be used for scenario development to explore the optimal system size based on the layout of current or new buildings. The model also promotes technology innovation by facilitating the systems-level comparison of options to lower costs, improve energy efficiency, and lower greenhouse gas emissions.
46 CFR 56.04-10 - Other systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...
46 CFR 56.04-10 - Other systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...
46 CFR 56.04-10 - Other systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...
46 CFR 56.04-10 - Other systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...
46 CFR 56.04-10 - Other systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...
24 CFR 3280.705 - Gas piping systems.
Code of Federal Regulations, 2013 CFR
2013-04-01
... § 3280.705(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI Standard B36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded brass pipe in iron pipe sizes may be used. Threaded brass pipe shall comply with ASTM B43-91, Standard Specification for Seamless Red Brass Pipe, Standard...
24 CFR 3280.705 - Gas piping systems.
Code of Federal Regulations, 2012 CFR
2012-04-01
... § 3280.705(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI Standard B36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded brass pipe in iron pipe sizes may be used. Threaded brass pipe shall comply with ASTM B43-91, Standard Specification for Seamless Red Brass Pipe, Standard...
24 CFR 3280.705 - Gas piping systems.
Code of Federal Regulations, 2010 CFR
2010-04-01
... § 3280.705(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI Standard B36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded brass pipe in iron pipe sizes may be used. Threaded brass pipe shall comply with ASTM B43-91, Standard Specification for Seamless Red Brass Pipe, Standard...
24 CFR 3280.705 - Gas piping systems.
Code of Federal Regulations, 2011 CFR
2011-04-01
... § 3280.705(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI Standard B36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded brass pipe in iron pipe sizes may be used. Threaded brass pipe shall comply with ASTM B43-91, Standard Specification for Seamless Red Brass Pipe, Standard...
Study on pipe deflection by using numerical method
NASA Astrophysics Data System (ADS)
Husaini; Zaki Mubarak, Amir; Agustiar, Rizki
2018-05-01
Piping systems are widely used in a refinery or oil and gas industry. The piping system must be properly designed to avoid failure or leakage. Pipe stress analysis is conducted to analyze the loads and critical stress occurred, so that the failure of the pipe can be avoided. In this research, it is analyzed the deflection of a pipe by using Finite Element Method. The pipe is made of A358 / 304SS SCH10S Stainless Steel. It is 16 inches in size with the distance between supports is 10 meters. The fluid flown is Liquid Natural Gas (LNG) with the range of temperature of -120 ° C to -170 ° C, and a density of 461.1 kg / m 3. The flow of LNG causes deflection of the pipe. The pipe deflection must be within the permissible tolerable range. The objective is to analyze the deflection occurred in the piping system. Based on the calculation and simulation, the deflection is 4.4983 mm, which is below the maximum limit of deflection allowed, which is 20.3 mm.
NASA Technical Reports Server (NTRS)
Ernst, D. M.
1981-01-01
The critical evaluation and subsequent redesign of the power conversion subsystem of the spacecraft are covered. As part of that evaluation and redesign, prototype heat pipe components for the heat rejection system were designed fabricated and tested. Based on the results of these tests in conjunction with changing mission requirements and changing energy conversion devices, new system designs were investigated. The initial evaluation and redesign was based on state-of-the-art fabrication and assembly techniques for high temperature liquid metal heat pipes and energy conversion devices. The hardware evaluation demonstrated the validity of several complicated heat pipe geometries and wick structures, including an annular-to-circular transition, bends in the heat pipe, long heat pipe condensers and arterial wicks. Additionally, a heat pipe computer model was developed which describes the end point temperature profile of long radiator heat pipes to within several degrees celsius.
Productivity Engineering in the UNIX Environment
1985-12-01
obtained with »eeept and connect. The call pipe (pv) result int pv[2]; creates a pur of SOCK_STR£AM sockets in the UNIX domain, with pv[0] only writeable...communications domain. 3.8.2.1. Types of aocket« In the UNK domain, the SOCK..STREAM abstraction provides pipe -like facilities, while SOCKJX3RAM...among the cylinder groups looking for a free block. 4) Finally if the rehash fails, apply an exhaustive search. The use of quadratic rehash is
2014-07-24
Service UST Underground Storage Tank VC Vitrified Clay VOCs Volatile Organic Compounds W Watts 1 1.0 PURPOSE AND NEED FOR ACTION 1.1 INTRODUCTION The...discharged to sanitary drain and the solids slurry is hauled off site for disposal Fluoride drain: welded stainless steel drain piping from wet...diameter vitrified clay (VC) gravity sewer collection pipe, flowing north/northeast to the upper pumping station at Building 1306, is located within the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Jaesun; Cho, Younho; Park, Jun-Pil
Guided wave was widely studied for plate and pipe due to the great application area. Guided wave has advantage on long distance inspection for an inaccessible area and apart from transducer. Quite often shrink fit structures were found in nuclear power facilities. In this paper, two pipes were designed with perfect shrink fit condition for Stainless Steel 316. The displacement distribution was calculated with boundary condition. The interface wave propagation pattern was analyzed by the numerical modeling. The experimental results show a possibility of weld delamination and defect detection.
Heat pipe radiator. [for spacecraft waste heat rejection
NASA Technical Reports Server (NTRS)
Swerdling, B.; Alario, J.
1973-01-01
A 15,000 watt spacecraft waste heat rejection system utilizing heat pipe radiator panels was investigated. Of the several concepts initially identified, a series system was selected for more in-depth analysis. As a demonstration of system feasibility, a nominal 500 watt radiator panel was designed, built and tested. The panel, which is a module of the 15,000 watt system, consists of a variable conductance heat pipe (VCHP) header, and six isothermalizer heat pipes attached to a radiating fin. The thermal load to the VCHP is supplied by a Freon-21 liquid loop via an integral heat exchanger. Descriptions of the results of the system studies and details of the radiator design are included along with the test results for both the heat pipe components and the assembled radiator panel. These results support the feasibility of using heat pipes in a spacecraft waste heat rejection system.
Structural health monitoring of pipelines rehabilitated with lining technology
NASA Astrophysics Data System (ADS)
Farhidzadeh, Alireza; Dehghan-Niri, Ehsan; Salamone, Salvatore
2014-03-01
Damage detection of pipeline systems is a tedious and time consuming job due to digging requirement, accessibility, interference with other facilities, and being extremely wide spread in metropolitans. Therefore, a real-time and automated monitoring system can pervasively reduce labor work, time, and expenditures. This paper presents the results of an experimental study aimed at monitoring the performance of full scale pipe lining systems, subjected to static and dynamic (seismic) loading, using Acoustic Emission (AE) technique and Guided Ultrasonic Waves (GUWs). Particularly, two damage mechanisms are investigated: 1) delamination between pipeline and liner as the early indicator of damage, and 2) onset of nonlinearity and incipient failure of the liner as critical damage state.
46 CFR 154.1735 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2011 CFR
2011-10-01
... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...
46 CFR 154.1735 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2014 CFR
2014-10-01
... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...
46 CFR 154.1735 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2013 CFR
2013-10-01
... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...
46 CFR 154.1735 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2012 CFR
2012-10-01
... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...
46 CFR 154.1735 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2010 CFR
2010-10-01
... mixture must have a refrigeration system without vapor compression or have a refrigeration system with the... separate cargo piping, vent piping, and refrigeration equipment for methyl acetylene-propadiene that are segregated from other cargo piping, vent piping and refrigeration equipment on the vessel. [CGD 74-289, 44 FR...
A heat receiver design for solar dynamic space power systems
NASA Technical Reports Server (NTRS)
Baker, Karl W.; Dustin, Miles O.; Crane, Roger
1990-01-01
An advanced heat pipe receiver designed for a solar dynamic space power system is described. The power system consists of a solar concentrator, solar heat receiver, Stirling heat engine, linear alternator and waste heat radiator. The solar concentrator focuses the sun's energy into a heat receiver. The engine and alternator convert a portion of this energy to electric power and the remaining heat is rejected by a waste heat radiator. Primary liquid metal heat pipes transport heat energy to the Stirling engine. Thermal energy storage allows this power system to operate during the shade portion of an orbit. Lithium fluoride/calcium fluoride eutectic is the thermal energy storage material. Thermal energy storage canisters are attached to the midsection of each heat pipe. The primary heat pipes pass through a secondary vapor cavity heat pipe near the engine and receiver interface. The secondary vapor cavity heat pipe serves three important functions. First, it smooths out hot spots in the solar cavity and provides even distribution of heat to the engine. Second, the event of a heat pipe failure, the secondary heat pipe cavity can efficiently transfer heat from other operating primary heat pipes to the engine heat exchanger of the defunct heat pipe. Third, the secondary heat pipe vapor cavity reduces temperature drops caused by heat flow into the engine. This unique design provides a high level of reliability and performance.
Cutting Electricity Costs in Miami-Dade County, Florida
Alvarez, Carlos; Oliver, LeAnn; Kronheim, Steve; Gonzalez, Jorge; Woods-Richardson, Kathleen
2018-02-06
Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity needs.
Robotic platform for traveling on vertical piping network
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nance, Thomas A; Vrettos, Nick J; Krementz, Daniel
This invention relates generally to robotic systems and is specifically designed for a robotic system that can navigate vertical pipes within a waste tank or similar environment. The robotic system allows a process for sampling, cleaning, inspecting and removing waste around vertical pipes by supplying a robotic platform that uses the vertical pipes to support and navigate the platform above waste material contained in the tank.
BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schempf, H.; Bares, J.E.
This report explored the regulatory impact and cost-benefit of a robotic thermal asbestos pipe-insulation removal system over the current manual abatement work practice. The authors are currently in the second phase of a two-phase program to develop a robotic asbestos abatement system, comprised of a ground-based support system (including vacuum, fluid delivery, computing/electronics/power, and other subsystems) and several on-pipe removal units, each sized to handle pipes within a given diameter range. The intent of this study was to (i) aid in developing design and operational criteria for the overall system to maximize cost-efficiency, and (ii) to determine the commercial potentialmore » of a robotic pipe-insulation abatement system.« less
30. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...
30. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) INTERIOR BETWEEN GRIDS 17-A1 AND 18-A1, SHOWING REAR OF RADAR EMITTER ELECTRONIC INTERFACE TERMINAL NO. 3147-20, "RECEIVER TRANSMITTER RADAR" MODULE. VIEW IS ALSO SHOWING BUILDING FIRE STOP MATERIAL AT BOTTOM OF FLOOR. NOTE: WALL SLOPES BOTTOM TO TOP INWARD; STRUCTURAL ELEMENT IN FOREGROUND. VIEW ALSO SHOWS PIPING GRID OF CHILLED WATER LINES FOR ELECTRONIC SYSTEMS COOLING. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL ...
19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL PIPING. INEEL PHOTO NUMBER NRTS-59-3212. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
46 CFR 154.519 - Piping relief valves.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...
46 CFR 154.519 - Piping relief valves.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...
46 CFR 154.519 - Piping relief valves.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...
46 CFR 154.519 - Piping relief valves.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Process Piping Systems § 154.519 Piping relief valves. (a) The liquid relief valve that protects the cargo piping system from liquid pressure exceeding the design pressure must discharge into: (1) A cargo tank; or (2) A cargo vent mast if that vent mast has a means for the detection and removal of the liquid...
30 CFR 75.1101-12 - Equivalent dry-pipe system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...
30 CFR 75.1101-12 - Equivalent dry-pipe system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...
30 CFR 75.1101-12 - Equivalent dry-pipe system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...
30 CFR 75.1101-12 - Equivalent dry-pipe system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...
30 CFR 75.1101-12 - Equivalent dry-pipe system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...
46 CFR 151.50-79 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2011 CFR
2011-10-01
... suction line. (c) The piping system, including the cargo refrigeration system, for tanks to be loaded with methyl acetylene-propadiene mixture must be completely separate from piping and refrigeration systems for other tanks. If the piping system for the tanks to be loaded with methyl acetylene-propadiene mixture is...
46 CFR 151.50-79 - Methyl acetylene-propadiene mixture.
Code of Federal Regulations, 2010 CFR
2010-10-01
... suction line. (c) The piping system, including the cargo refrigeration system, for tanks to be loaded with methyl acetylene-propadiene mixture must be completely separate from piping and refrigeration systems for other tanks. If the piping system for the tanks to be loaded with methyl acetylene-propadiene mixture is...
Analysis of fine coal pneumatic systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mathur, M.P.; Rohatgi, N.D.; Klinzing, G.E.
1987-01-01
Many fossil fuel energy processes depend on the movement of solids by pneumatic transport. Despite the considerable amount of work reported in the literature on pneumatic transport, the design of new industrial systems for new products continues to rely to a great extent on empiricism. A pilot-scale test facility has been constructed at Pittsburgh Energy Technology Center (PETC) and is equipped with modern sophisticated measuring techniques (such as Pressure Transducers, Auburn Monitors, Micro Motion Mass flowmeters) and an automatic computer-controlled data acquisition system to study the effects of particle pneumatic transport. Pittsburgh Seam and Montana rosebud coals of varying sizemore » consist and moisture content were tested in the atmospheric and pressurized coal flow test loops (AP/CFTL and HP/CFTL) at PETC. The system parameters included conveying gas velocity, injector tank pressure, screw conveyor speed, pipe radius, and pipe bends. In the following report, results from the coal flow tests were presented and analyzed. Existing theories and correlations on two-phase flows were reviewed. Experimental data were compared with values calculated from empirically or theoretically derived equations available in the literature, and new correlations were proposed, when applicable, to give a better interpretation of the data and a better understanding of the various flow regimes involved in pneumatic transport. 55 refs., 56 figs., 6 tabs.« less
Decommissioning of the 247-F Fuel Manufacturing Facility at the Savannah River Site (SRS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Santos, Joseph K.; Chostner, Stephen M.
Building 247-F at SRS was a roughly 110,000 ft{sup 2} two-story facility designed and constructed during the height of the cold war naval buildup to provide additional naval nuclear fuel manufacturing capacity in early 1980's. The manufacturing process employed a wide variety of acids, bases, and other hazardous materials. As the need for naval fuel declined, the facility was shut down and underwent initial deactivation, which was completed in 1990. All process systems were flushed with water and drained using the existing process drain valves. However, since these drains were not always installed at the lowest point in piping andmore » equipment systems, a significant volume of liquid remained after initial deactivation. After initial deactivation, a non-destructive assay of the process area identified approximately 17 ({+-}100%) kg of uranium held up in equipment and piping. The facility was placed in Surveillance and Maintenance mode until 2003, when the decision was made to perform final deactivation, and then decommission the facility. The following lessons were learned as a result of the D and D of building 247-F. Successful D and D of a major radiochemical process building requires significant up-front planning by a team of knowledgeable personnel led by a strong project manager. The level of uncertainty and resultant risk to timely, cost effective project execution was found to be high. Examples of the types of problems encountered which had high potential to adversely impact cost and schedule performance are described below. Low level and sanitary waste acceptance criteria do not allow free liquids in waste containers. These liquids, which are often corrosive, must be safely removed from the equipment before it is loaded to waste containers. Drained liquids must be properly managed, often as hazardous or mixed waste. Tapping and draining of process lines is a dangerous operation, which must be performed carefully. The temptation to become complacent when breaking into lines is great. Incidents of personnel exposure to liquids during draining are likely. Records from the initial 1990 deactivation led early work planners to assume the facility was cold, dark and dry. This turned out to be a poor assumption. Work instructions had to be modified to require that engineers evaluate each of several hundred process lines to identify the low point, where a tap and drain system could be installed to allow positive verification that the line was empty before the line was cut for removal. During the period between facility shut down in 1990 and the start of final deactivation in 2003, roof leaks had developed, allowing rain water to enter building 247-F, which provided an environment for mold growth. Sampling confirmed the presence of Stachybotrys chartarum, a toxic indoor mold that grows on wet cellulosic material, such as drywall paper. D and D workers in areas where this hazard was identified were required to where proper personal protective equipment, which complicated work execution. Discovery of the potential presence of uniquely hazardous chemicals such as shock sensitive compounds and toxic uranium hexafluoride became issues which required investigation and special handling strategies. Team access to subject matter experts, who could quickly provide the required guidance for safe material handling, was critical to keeping the project on schedule. In old legacy facilities, it is possible that the D and D workers will be exposed to undocumented energy sources such as energized electrical conductors and pipes containing hazardous materials that originate outside the boundaries of the facility. Significant effort must be expended on adequate mechanical and electrical isolation. Subdividing the facility into well defined zones for which detailed zone-specific end points could be developed proved to be a highly effective project management strategy. Waste management must be carefully planned. The rate of waste generation as the facility is converted from a structure to waste can frequently exceed the D and D team's resources to characterize, package, store and transport the waste to a disposal facility in a timely manner. This can lead to schedule delays and/or increased project cost.« less
Meier, Thomas R; Maute, Carrie J; Cadillac, Joan M; Lee, Ji Young; Righter, Daniel J; Hugunin, Kelly MS; Deininger, Rolf A; Dysko, Robert C
2008-01-01
The use of automated watering systems for providing drinking water to rodents has become commonplace in the research setting. Little is known regarding bacterial biofilm growth within the water piping attached to the racks (manifolds). The purposes of this project were to determine whether the mouse oral flora contributed to the aerobic bacterial component of the rack biofilm, quantify bacterial growth in rack manifolds over 6 mo, assess our rack sanitation practices, and quantify bacterial biofilm development within sections of the manifold. By using standard methods of bacterial identification, the aerobic oral flora of 8 strains and stocks of mice were determined on their arrival at our animal facility. Ten rack manifolds were sampled before, during, and after sanitation and monthly for 6 mo. Manifolds were evaluated for aerobic bacterial growth by culture on R2A and trypticase soy agar, in addition to bacterial ATP quantification by bioluminescence. In addition, 6 racks were sampled at 32 accessible sites for evaluation of biofilm distribution within the watering manifold. The identified aerobic bacteria in the oral flora were inconsistent with the bacteria from the manifold, suggesting that the mice do not contribute to the biofilm bacteria. Bacterial growth in manifolds increased while they were in service, with exponential growth of the biofilm from months 3 to 6 and a significant decrease after sanitization. Bacterial biofilm distribution was not significantly different across location quartiles of the rack manifold, but bacterial levels differed between the shelf pipe and connecting elbow pipes. PMID:18351724
Meier, Thomas R; Maute, Carrie J; Cadillac, Joan M; Lee, Ji Young; Righter, Daniel J; Hugunin, Kelly M S; Deininger, Rolf A; Dysko, Robert C
2008-03-01
The use of automated watering systems for providing drinking water to rodents has become commonplace in the research setting. Little is known regarding bacterial biofilm growth within the water piping attached to the racks (manifolds). The purposes of this project were to determine whether the mouse oral flora contributed to the aerobic bacterial component of the rack biofilm, quantify bacterial growth in rack manifolds over 6 mo, assess our rack sanitation practices, and quantify bacterial biofilm development within sections of the manifold. By using standard methods of bacterial identification, the aerobic oral flora of 8 strains and stocks of mice were determined on their arrival at our animal facility. Ten rack manifolds were sampled before, during, and after sanitation and monthly for 6 mo. Manifolds were evaluated for aerobic bacterial growth by culture on R2A and trypticase soy agar, in addition to bacterial ATP quantification by bioluminescence. In addition, 6 racks were sampled at 32 accessible sites for evaluation of biofilm distribution within the watering manifold. The identified aerobic bacteria in the oral flora were inconsistent with the bacteria from the manifold, suggesting that the mice do not contribute to the biofilm bacteria. Bacterial growth in manifolds increased while they were in service, with exponential growth of the biofilm from months 3 to 6 and a significant decrease after sanitization. Bacterial biofilm distribution was not significantly different across location quartiles of the rack manifold, but bacterial levels differed between the shelf pipe and connecting elbow pipes.
Computer program determines gas flow rates in piping systems
NASA Technical Reports Server (NTRS)
Franke, R.
1966-01-01
Computer program calculates the steady state flow characteristics of an ideal compressible gas in a complex piping system. The program calculates the stagnation and total temperature, static and total pressure, loss factor, and forces on each element in the piping system.
A mathematical model to predict the effect of heat recovery on the wastewater temperature in sewers.
Dürrenmatt, David J; Wanner, Oskar
2014-01-01
Raw wastewater contains considerable amounts of energy that can be recovered by means of a heat pump and a heat exchanger installed in the sewer. The technique is well established, and there are approximately 50 facilities in Switzerland, many of which have been successfully using this technique for years. The planning of new facilities requires predictions of the effect of heat recovery on the wastewater temperature in the sewer because altered wastewater temperatures may cause problems for the biological processes used in wastewater treatment plants and receiving waters. A mathematical model is presented that calculates the discharge in a sewer conduit and the spatial profiles and dynamics of the temperature in the wastewater, sewer headspace, pipe, and surrounding soil. The model was implemented in the simulation program TEMPEST and was used to evaluate measured time series of discharge and temperatures. It was found that the model adequately reproduces the measured data and that the temperature and thermal conductivity of the soil and the distance between the sewer pipe and undisturbed soil are the most sensitive model parameters. The temporary storage of heat in the pipe wall and the exchange of heat between wastewater and the pipe wall are the most important processes for heat transfer. The model can be used as a tool to determine the optimal site for heat recovery and the maximal amount of extractable heat. Copyright © 2013 Elsevier Ltd. All rights reserved.
Thomas, Graham H.; Morrow, Valerie L.; Levie, Harold; Kane, Ronald J.; Brown, Albert E.
2003-12-23
An ultrasonic pipe or other structure assessment system includes an ultrasonic transducer positioned proximate the pipe or other structure. A fluid connection between the ultrasonic transducer and the pipe or other structure is produced. The ultrasonic transducer is moved relative to the pipe or other structure.
24 CFR 3280.706 - Oil piping systems.
Code of Federal Regulations, 2013 CFR
2013-04-01
... described in § 3280.706(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI B 36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded copper or brass pipe in iron pipe sizes may be used. (2) Fittings for oil piping shall be wrought-iron, malleable iron, steel, or brass (containing...
24 CFR 3280.706 - Oil piping systems.
Code of Federal Regulations, 2012 CFR
2012-04-01
... described in § 3280.706(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI B 36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded copper or brass pipe in iron pipe sizes may be used. (2) Fittings for oil piping shall be wrought-iron, malleable iron, steel, or brass (containing...
Morrison, Edward F.; Bergman, John W.
2001-05-22
A readily replaceable heat exchange cooling jacket for applying fluid to a system conduit pipe. The cooling jacket comprises at least two members, separable into upper and lower portions. A chamber is formed between the conduit pipe and cooling jacket once the members are positioned about the pipe. The upper portion includes a fluid spray means positioned above the pipe and the bottom portion includes a fluid removal means. The heat exchange cooling jacket is adaptable with a drain tank, a heat exchanger, a pump and other standard equipment to provide a system for removing heat from a pipe. A method to remove heat from a pipe, includes the steps of enclosing a portion of the pipe with a jacket to form a chamber between an outside surface of the pipe and the cooling jacket; spraying cooling fluid at low pressure from an upper portion of the cooling jacket, allowing the fluid to flow downwardly by gravity along the surface of the pipe toward a bottom portion of the chamber; and removing the fluid at the bottom portion of the chamber.
Pipe support for use in a nuclear system
Pollono, Louis P.; Mello, Raymond M.
1977-01-01
A pipe support for high temperature, thin-walled vertical piping runs used in a nuclear system. A cylindrical pipe transition member, having the same inside diameter as the thin-walled piping, replaces a portion of the piping where support is desired. The outside diameter of the pipe transition member varies axially along its vertical dimension. For a section of the axial length adjacent the upper and lower terminations of the pipe transition member, the outside diameter is the same as the outside diameter of the thin-walled piping to which it is affixed. Intermediate of the termination sections, the outside diameter increases from the top of the member to the bottom. Adjacent the lower termination section, the diameter abruptly becomes the same as the piping. Thus, the cylindrical transition member is formed to have a generally triangular shaped cross-section along the axial dimension. Load-bearing insulation is installed next to the periphery of the member and is kept in place by an outer ring clamp. The outer ring clamp is connected to pipe hangers, which provide the desired support for the vertical thin-walled piping runs.
NASA Astrophysics Data System (ADS)
Connell, Matthew
Increased installation of polymer potable water pipes in United States plumbing systems has created a need to thoroughly evaluate their water quality impacts. Eleven brands of new polymer drinking water pipe were evaluated for assimilable organic carbon (AOC) release at room temperature for 28 days. They included polyvinyl chloride (PVC), high-density polyethylene (HDPE), polypropylene (PP), and cross-linked polyethylene (PEX) pipes. Three of eight PEX pipe brands exceeded a 100 microg/L AOC threshold for microbial regrowth for the first exposure period and no brands exceeded this value on day 28. No detectable increase in AOC was found for PP and PEX-a1 pipes; the remaining pipe brands contributed marginal AOC levels. Water quality impacts were more fully evaluated for two brands of PEX-b and one brand of PP pipe. PEX pipes released more total organic carbon (TOC), volatile organic compounds (VOC), and semivolatile organic compounds (SVOC) and caused greater odor than the PP pipe. All three materials showed reductions in these water quality parameters over 30 days. Three PEX pipe field studies revealed that aged systems did not display more intense odors than distribution systems. However, the organic releases from polymer pipes may still alter water quality and contribute to rapid microbial growth, even though the aesthetic impacts are temporary.
NASA Technical Reports Server (NTRS)
Ellerbrock, Herman H.; Wcislo, Chester R.; Dexter, Howard E.
1947-01-01
Investigations were made to develop a simplified method for designing exhaust-pipe shrouds to provide desired or maximum cooling of exhaust installations. Analysis of heat exchange and pressure drop of an adequate exhaust-pipe shroud system requires equations for predicting design temperatures and pressure drop on cooling air side of system. Present experiments derive such equations for usual straight annular exhaust-pipe shroud systems for both parallel flow and counter flow. Equations and methods presented are believed to be applicable under certain conditions to the design of shrouds for tail pipes of jet engines.
46 CFR 105.20-5 - Piping systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... that seamless steel pipe or tubing which provides equivalent safety may be used for diesel cargo... that steel or nodular iron may be used in cargo systems utilizing steel pipe or tubing. (c) Aluminium...
46 CFR 105.20-5 - Piping systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... that seamless steel pipe or tubing which provides equivalent safety may be used for diesel cargo... that steel or nodular iron may be used in cargo systems utilizing steel pipe or tubing. (c) Aluminium...
46 CFR 105.20-5 - Piping systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... that seamless steel pipe or tubing which provides equivalent safety may be used for diesel cargo... that steel or nodular iron may be used in cargo systems utilizing steel pipe or tubing. (c) Aluminium...
46 CFR 105.20-5 - Piping systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... that seamless steel pipe or tubing which provides equivalent safety may be used for diesel cargo... that steel or nodular iron may be used in cargo systems utilizing steel pipe or tubing. (c) Aluminium...
Experimental Investigation of Concrete Runway Snow Melting Utilizing Heat Pipe Technology
Su, Xin; Ye, Qing; Fu, Jianfeng
2018-01-01
A full scale snow melting system with heat pipe technology is built in this work, which avoids the negative effects on concrete structure and environment caused by traditional deicing chemicals. The snow melting, ice-freezing performance and temperature distribution characteristics of heat pipe concrete runway were discussed by the outdoor experiments. The results show that the temperature of the concrete pavement is greatly improved with the heat pipe system. The environment temperature and embedded depth of heat pipe play a dominant role among the decision variables of the snow melting system. Heat pipe snow melting pavement melts the snow completely and avoids freezing at any time when the environment temperature is below freezing point, which is secure enough for planes take-off and landing. Besides, the exportation and recovery of geothermal energy indicate that this system can run for a long time. This paper will be useful for the design and application of the heat pipe used in the runway snow melting. PMID:29551957
Experimental Investigation of Concrete Runway Snow Melting Utilizing Heat Pipe Technology.
Chen, Fengchen; Su, Xin; Ye, Qing; Fu, Jianfeng
2018-01-01
A full scale snow melting system with heat pipe technology is built in this work, which avoids the negative effects on concrete structure and environment caused by traditional deicing chemicals. The snow melting, ice-freezing performance and temperature distribution characteristics of heat pipe concrete runway were discussed by the outdoor experiments. The results show that the temperature of the concrete pavement is greatly improved with the heat pipe system. The environment temperature and embedded depth of heat pipe play a dominant role among the decision variables of the snow melting system. Heat pipe snow melting pavement melts the snow completely and avoids freezing at any time when the environment temperature is below freezing point, which is secure enough for planes take-off and landing. Besides, the exportation and recovery of geothermal energy indicate that this system can run for a long time. This paper will be useful for the design and application of the heat pipe used in the runway snow melting.
ICPP tank farm closure study. Volume 2: Engineering design files
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less
The locating ways of laying pipe manipulator
NASA Astrophysics Data System (ADS)
Wang, Dan; Li, Bin; Lei, DongLiang
2010-01-01
The laying pipe manipulator is a new equipment to lay concrete pipe. This kind of manipulator makes the work of laying pipes mechanized and automated. We report here a new laying pipe manipulator. The manipulator has 5 free degrees, and is driven by the hydraulic system. In the paper, one critical question of manipulator is studied: the locating ways of the manipulator to lay concrete pipe. During the process of laying concrete pipe, how to locate the manipulator is realized by the locating system of manipulator. The locating system consists of photoelectric target, laser producer, and computer. According to different construction condition, one or two or three photoelectric targets can be used. During the process of laying concrete pipe, if the interface of pipes are jointed together, and the other segment of pipe deviates from the pipe way, one target can be used, if the angle that the manipulator rotates around the holding pipe's axes is 0°, two targets can be used, three targets can be used at any site. In the paper, according to each locating way, the theory analysis is done. And the mathematical models of the manipulator moving from original position to goal position are obtained by different locating way. And the locating experiment was done. According to the experiment result, the work principle and mathematical models of different locating way was turned out to be well adopted for requirement, the mathematical model of different locating way supplies the basic control theory for the manipulator to lay and joint concrete pipe automatically.
Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.« less
Heat pipe heat transport system for the Stirling Space Power Converter (SSPC)
NASA Technical Reports Server (NTRS)
Alger, Donald L.
1992-01-01
Life issues relating to a sodium heat pipe heat transport system are described. The heat pipe system provides heat, at a temperature of 1050 K, to a 50 kWe Stirling engine/linear alternator power converter called the Stirling Space Power Converter (SSPC). The converter is being developed under a National Aeronautics and Space Administration program. Since corrosion of heat pipe materials in contact with sodium can impact the life of the heat pipe, a literature review of sodium corrosion processes was performed. It was found that the impurity reactions, primarily oxygen, and dissolution of alloy elements were the two corrosion process likely to be operative in the heat pipe. Approaches that are being taken to minimize these corrosion processes are discussed.
46 CFR 56.50-85 - Tank-vent piping.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-control systems or other, equivalent means, together with gauging devices and procedures for filling cargo... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-85 Tank-vent piping. (a) This section...
System and Method for Traversing Pipes
NASA Technical Reports Server (NTRS)
Graf, Jodi (Inventor); Pettinger, Ross (Inventor); Azimi, Shaun (Inventor); Magruder, Darby (Inventor); Ridley, Justin (Inventor); Lapp, Anthony (Inventor)
2017-01-01
A system and method is provided for traversing inside one or more pipes. In an embodiment, a fluid is injected into the one or more pipes thereby promoting a fluid flow. An inspection device is deployed into the one or more pipes at least partially filled with a flowing fluid. The inspection device comprises a housing wherein the housing is designed to exploit the hydrokinetic effects associated with a fluid flow in one or more pipes as well as maneuver past a variety of pipe configurations. The inspection device may contain one or more sensors capable of performing a variety of inspection tasks.
46 CFR 182.510 - Bilge piping system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...
46 CFR 182.510 - Bilge piping system.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...
Maximal design basis accident of fusion neutron source DEMO-TIN
NASA Astrophysics Data System (ADS)
Kolbasov, B. N.
2015-12-01
When analyzing the safety of nuclear (including fusion) facilities, the maximal design basis accident at which the largest release of activity is expected must certainly be considered. Such an accident is usually the failure of cooling systems of the most thermally stressed components of a reactor (for a fusion facility, it is the divertor or the first wall). The analysis of safety of the ITER reactor and fusion power facilities (including hybrid fission-fusion facilities) shows that the initial event of such a design basis accident is a large-scale break of a pipe in the cooling system of divertor or the first wall outside the vacuum vessel of the facility. The greatest concern is caused by the possibility of hydrogen formation and the inrush of air into the vacuum chamber (VC) with the formation of a detonating mixture and a subsequent detonation explosion. To prevent such an explosion, the emergency forced termination of the fusion reaction, the mounting of shutoff valves in the cooling systems of the divertor and the first wall or blanket for reducing to a minimum the amount of water and air rushing into the VC, the injection of nitrogen or inert gas into the VC for decreasing the hydrogen and oxygen concentration, and other measures are recommended. Owing to a continuous feed-out of the molten-salt fuel mixture from the DEMO-TIN blanket with the removal period of 10 days, the radioactivity release at the accident will mainly be determined by tritium (up to 360 PBq). The activity of fission products in the facility will be up to 50 PBq.
Lee, Jonathan K.; Visser, H.M.; Jenter, H.L.; Duff, M.P.
2000-01-01
U.S. Geological Survey (USGS) hydrologists and ecologist are conducting studies to quantify vegetative flow resistance in order to improve numerical models of surface-water flow in the Florida Everglades. Water-surface slope is perhaps the most difficult of the flow resistance parameters to measure in the Everglades due to the very low gradients of the topography and flow. In an effort to measure these very small slopes, a unique pipe manometer was developed for the local measurement of water-surface slopes on the order of 1 centimeter per kilometer (cm/km). According to theory, a very precise measurement of centerline velocity obtained inside the pipe manometer should serve as a unique proxy for water-surface slope in the direction of the pipe axis. In order to confirm this theoretical relationship and calibrate the pipe manometer, water-surface elevation and pipe centerline velocity data were simultaneously measured in a set of experiments carried out in the tilting flume at the USGS Hydraulic Laboratory Facility at Stennis Space Center, Mississippi. A description of the instrumentation and methods used to evaluate this technique for measuring water-surface slope as well as a summary of the entire data set is presented.
46 CFR 105.20-5 - Piping systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... that seamless steel pipe or tubing which provides equivalent safety may be used for diesel cargo... that steel or nodular iron may be used in cargo systems utilizing steel pipe or tubing. (c) Aluminum or...
24 CFR 3280.706 - Oil piping systems.
Code of Federal Regulations, 2011 CFR
2011-04-01
... installation extension, alteration, or repair, of any oil piping systems shall be new and free from defects or... used to join sections of threaded pipe. Right and left nipples or couplings shall not be used. (h...
Identification of sewer pipes to be cleaned for reduction of CSO pollutant load.
Nagaiwa, Akihiro; Settsu, Katsushi; Nakajima, Fumiyuki; Furumai, Hiroaki
2007-01-01
To reduce the CSO (Combined Sewer Overflow) pollutant discharge, one of the effective options is cleaning of sewer pipes before rainfall events. To maximize the efficiency, identification of pipes to be cleaned is necessary. In this study, we discussed the location of pipe deposit in dry weather in a combined sewer system using a distributed model and investigated the effect of pipe cleaning to reduce the pollutant load from the CSO. First we simulated the dry weather flow in a combined sewer system. The pipe deposit distribution in the network was estimated after 3 days of dry weather period. Several specific pipes with structural defect and upper end pipes tend to have an accumulation of deposit. Wet weather simulations were conducted with and without pipe cleaning in rainfall events with different patterns. The SS loads in CSO with and without the pipe cleaning were compared. The difference in the estimated loads was interpreted as the contribution of wash-off in the cleaned pipe. The effect of pipe cleaning on reduction of the CSO pollutant load was quantitatively evaluated (e.g. the cleaning of one specific pipe could reduce 22% of total CSO load). The CSO simulations containing pipe cleaning options revealed that identification of pipes with accumulated deposit using the distributed model is very useful and informative to evaluate the applicability of pipe cleaning option for CSO pollutant reduction.
46 CFR 56.04-2 - Piping classification according to service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Piping classification according to service. 56.04-2... PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-2 Piping classification according to... Piping Classification Service Class 1 Pressure (p.s.i.g.) Temp. (°F) Class B and C poisons 2 I any and 0...
46 CFR 56.04-2 - Piping classification according to service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Piping classification according to service. 56.04-2... PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-2 Piping classification according to... Piping Classification Service Class 1 Pressure (p.s.i.g.) Temp. (°F) Class B and C poisons 2 I any and 0...
Flexible ultrasonic pipe inspection apparatus
Jenkins, C.F.; Howard, B.D.
1994-01-01
Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.
1979-12-01
the surface, together with the effect of flying flintstones results in severe wear to the tyres , brake pipes and all other fittings found underneath a...The building also contains the following test facilities. A 15 m square flat floor used for vehicle measurement accuracy checks, tyre deflections, and... tyres . The course is regularly maintained but dependant on weather, the surface condition may display marked differences. Alpine Course This is a
Yoo, Do Guen; Lee, Ho Min; Sadollah, Ali; Kim, Joong Hoon
2015-01-01
Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply.
Lee, Ho Min; Sadollah, Ali
2015-01-01
Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply. PMID:25874252
Magnetic Fields on the National Ignition Facility (MagNIF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mason, D.; Folta, J.
2016-08-12
A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentallymore » relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.« less
Study of a risk-based piping inspection guideline system.
Tien, Shiaw-Wen; Hwang, Wen-Tsung; Tsai, Chih-Hung
2007-02-01
A risk-based inspection system and a piping inspection guideline model were developed in this study. The research procedure consists of two parts--the building of a risk-based inspection model for piping and the construction of a risk-based piping inspection guideline model. Field visits at the plant were conducted to develop the risk-based inspection and strategic analysis system. A knowledge-based model had been built in accordance with international standards and local government regulations, and the rational unified process was applied for reducing the discrepancy in the development of the models. The models had been designed to analyze damage factors, damage models, and potential damage positions of piping in the petrochemical plants. The purpose of this study was to provide inspection-related personnel with the optimal planning tools for piping inspections, hence, to enable effective predictions of potential piping risks and to enhance the better degree of safety in plant operations that the petrochemical industries can be expected to achieve. A risk analysis was conducted on the piping system of a petrochemical plant. The outcome indicated that most of the risks resulted from a small number of pipelines.
Experimental and analytical study of water pipe's rupture for damage identification purposes
NASA Astrophysics Data System (ADS)
Papakonstantinou, Konstantinos G.; Shinozuka, Masanobu; Beikae, Mohsen
2011-04-01
A malfunction, local damage or sudden pipe break of a pipeline system can trigger significant flow variations. As shown in the paper, pressure variations and pipe vibrations are two strongly correlated parameters. A sudden change in the flow velocity and pressure of a pipeline system can induce pipe vibrations. Thus, based on acceleration data, a rapid detection and localization of a possible damage may be carried out by inexpensive, nonintrusive monitoring techniques. To illustrate this approach, an experiment on a single pipe was conducted in the laboratory. Pressure gauges and accelerometers were installed and their correlation was checked during an artificially created transient flow. The experimental findings validated the correlation between the parameters. The interaction between pressure variations and pipe vibrations was also theoretically justified. The developed analytical model explains the connection among flow pressure, velocity, pressure wave propagation and pipe vibration. The proposed method provides a rapid, efficient and practical way to identify and locate sudden failures of a pipeline system and sets firm foundations for the development and implementation of an advanced, new generation Supervisory Control and Data Acquisition (SCADA) system for continuous health monitoring of pipe networks.
Comparison and validation of acoustic response models for wind noise reduction pipe arrays
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marty, Julien; Denis, Stéphane; Gabrielson, Thomas
The detection capability of the infrasound component of the International Monitoring System (IMS) is tightly linked to the performance of its wind noise reduction systems. The wind noise reduction solution implemented at all IMS infrasound measurement systems consists of a spatial distribution of air inlets connected to the infrasound sensor through a network of pipes. This system, usually referred to as “pipe array,” has proven its efficiency in operational conditions. The objective of this paper is to present the results of the comparison and validation of three distinct acoustic response models for pipe arrays. The characteristics of the models andmore » the results obtained for a defined set of pipe array configurations are described. A field experiment using a newly developed infrasound generator, dedicated to the validation of these models, is then presented. The comparison between the modeled and empirical acoustic responses shows that two of the three models can be confidently used to estimate pipe array acoustic responses. Lastly, this study paves the way to the deconvolution of IMS infrasound data from pipe array responses and to the optimization of pipe array design to IMS applications.« less
Comparison and validation of acoustic response models for wind noise reduction pipe arrays
Marty, Julien; Denis, Stéphane; Gabrielson, Thomas; ...
2017-02-13
The detection capability of the infrasound component of the International Monitoring System (IMS) is tightly linked to the performance of its wind noise reduction systems. The wind noise reduction solution implemented at all IMS infrasound measurement systems consists of a spatial distribution of air inlets connected to the infrasound sensor through a network of pipes. This system, usually referred to as “pipe array,” has proven its efficiency in operational conditions. The objective of this paper is to present the results of the comparison and validation of three distinct acoustic response models for pipe arrays. The characteristics of the models andmore » the results obtained for a defined set of pipe array configurations are described. A field experiment using a newly developed infrasound generator, dedicated to the validation of these models, is then presented. The comparison between the modeled and empirical acoustic responses shows that two of the three models can be confidently used to estimate pipe array acoustic responses. Lastly, this study paves the way to the deconvolution of IMS infrasound data from pipe array responses and to the optimization of pipe array design to IMS applications.« less
46 CFR 56.10-1 - Selection and limitations of piping components (replaces 105 through 108).
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Components § 56.10-1 Selection and... piping system components, shall meet material and standard requirements of subpart 56.60 and shall meet...
46 CFR 56.20-15 - Valves employing resilient material.
Code of Federal Regulations, 2010 CFR
2010-10-01
....20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Valves § 56.20-15 Valves employing resilient material. (a) A valve in which the... piping system manifolds; (ii) Isolation valves in cross-connects between two piping systems, at least one...
Further experiments for mean velocity profile of pipe flow at high Reynolds number
NASA Astrophysics Data System (ADS)
Furuichi, N.; Terao, Y.; Wada, Y.; Tsuji, Y.
2018-05-01
This paper reports further experimental results obtained in high Reynolds number actual flow facility in Japan. The experiments were performed in a pipe flow with water, and the friction Reynolds number was varied up to Reτ = 5.3 × 104. This high Reynolds number was achieved by using water as the working fluid and adopting a large-diameter pipe (387 mm) while controlling the flow rate and temperature with high accuracy and precision. The streamwise velocity was measured by laser Doppler velocimetry close to the wall, and the mean velocity profile, called log-law profile U+ = (1/κ) ln(y+) + B, is especially focused. After careful verification of the mean velocity profiles in terms of the flow rate accuracy and an evaluation of the consistency of the present results with those from previously measurements in a smaller pipe (100 mm), it was found that the value of κ asymptotically approaches a constant value of κ = 0.384.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suthar, K. J.; Lurie, Alexander M.; Den Hartog, P.
Heat pipes and vapour chambers work on heat exchange phenomena of two-phase flow and are widely used for in-dustrial and commercial applications. These devices offer very high effective thermal conductivities (5,000-200,000 W/m/K) and are adaptable to various sizes, shapes, and ori-entations. Although they have been found to be an excel-lent thermal management solution for laptops, satellites, and many things in-between, heat pipes and vapour cham-bers have yet to be adopted for use at particle accelerator facilities where they offer the possibility of more compact and more efficient means to remove heat from unwanted synchrotron radiation. As with all technologies, theremore » are inherent limitations. Foremost, they are limited by practi-cality to serve as local heat transfer devices; heat transfer over long distances is likely best provided by other means. Heat pipes also introduce unique failure modes which must be considered.« less
Construction and demolition waste as a source of PVC for recycling.
Prestes, Sabrina Moretto Darbello; Mancini, Sandro Donnini; Rodolfo, Antonio; Keiroglo, Raquel Carramillo
2012-02-01
Construction and demolition waste can contain considerable amounts of polyvinyl chloride (PVC). This paper describes a study of the recycling of PVC pipes collected from such waste materials. In a sorting facility for the specific disposal of construction and demolition waste, PVC was found to represent one-third of the plastics separated by workers. Pipes were sorted carefully to preclude any possible contamination by poly(ethylene terephthalate) (PET) found in the waste. The material was ground into two distinct particle sizes (final mesh of 12.7 and 8 mm), washed, dried and recycled. The average formulation of the pipes was determined based on ash content tests and used in the fabrication of a similar compound made mainly of virgin PVC. Samples of recycled pipes and of compound based on virgin material were subjected to tensile and impact tests and provided very similar results. These results are a good indication of the application potential of the recycled material and of the fact that longer grinding to obtain finer particles is not necessarily beneficial.
Design of the Sandia-Israel 20-kW reflux heat-pipe solar receiver/reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diver, R.B.; Ginn, W.C.
1987-09-01
This report describes the design and fabrication of a 20-kW sodium reflux heat-pipe solar receiver/reactor for CO/sub 2/ reforming of methane. This project is part of a bilateral agreement between the United States and Israel. Under the terms of the agreement the solar receiver/reactor has been designed and built by Sandia National Laboratories for testing in the 7-meter solar furnace facility at the Weizmann Institute of Science in Rehovot, Israel. 16 refs., 11 figs., 2 tabs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Pipe sizes and discharge rates for enclosed ventilation systems for rotating electrical equipment. 108.437 Section 108.437 Shipping COAST GUARD, DEPARTMENT OF... Systems Fixed Carbon Dioxide Fire Extinguishing Systems § 108.437 Pipe sizes and discharge rates for...
Development of an integrated heat pipe-thermal storage system for a solar receiver
NASA Technical Reports Server (NTRS)
Keddy, E.; Sena, J. Tom; Merrigan, M.; Heidenreich, Gary; Johnson, Steve
1988-01-01
An integrated heat pipe-thermal storage system was developed as part of the Organic Rankine Cycle Solar Dynamic Power System solar receiver for space station application. The solar receiver incorporates potassium heat pipe elements to absorb and transfer the solar energy within the receiver cavity. The heat pipes contain thermal energy storage (TES) canisters within the vapor space with a toluene heater tube used as the condenser region of the heat pipe. During the insolation period of the earth orbit, solar energy is delivered to the heat pipe. Part of this thermal energy is delivered to the heater tube and the balance is stored in the TES units. During the eclipse period of earth orbit, the stored energy in the TES units is transferred by the potassium vapor to the toluene heater tube. A developmental heat pipe element was constructed that contains axial arteries and a distribution wick connecting the toluene heater and the TES units to the solar insolation surface of the heat pipe. Tests were conducted to demonstrate the heat pipe, TES units, and the heater tube operation. The heat pipe element was operated at design input power of 4.8 kW. Thermal cycle tests were conducted to demonstrate the successful charge and discharge of the TES units. Axial power flux levels up to 15 watts/sq cm were demonstrated and transient tests were conducted on the heat pipe element. Details of the heat pipe development and test procedures are presented.
Turbulence scalings in pipe flows exhibiting polymer-induced drag reduction
NASA Astrophysics Data System (ADS)
Zadrazil, Ivan; Markides, Christos
2014-11-01
Non-intrusive laser based diagnostics technique, namely Particle Image Velocimetry, was used to in detail characterise polymer induced drag reduction in a turbulent pipe flow. The effect of polymer additives was investigated in a pneumatically-driven flow facility featuring a horizontal pipe test section of inner diameter 25.3 mm and length 8 m. Three high molecular weight polymers (2, 4 and 8 MDa) at concentrations of 5 - 250 wppm were used at Reynolds numbers from 35000 to 210000. The PIV derived results show that the level of drag reduction scales with different normalised turbulence parameters, e.g. streamwise and spanwise velocity fluctuations, vorticity or Reynolds stresses. These scalings are dependent of the distance from the wall, however, are independent of the Reynolds numbers range investigated.
Modeling of High Capacity Passive Cooling System
2009-03-01
Pulsating Heat Pipes : Closed Loop Pulsating Heat Pipes , which is also known as Meandering Capillary Tube Heat Pipe or Closed Loop Oscillating Heat ... Pipe , has emerged in the recent years as a new electronics cooling technology. The Pulsating Heat Pipe is an innovating technology that has gained...horizontal orientation, the operating temperatures are lower. Pulsating heat pipes are capable of higher heat
Development of an integrated heat pipe-thermal storage system for a solar receiver
NASA Technical Reports Server (NTRS)
Keddy, E. S.; Sena, J. T.; Merrigan, M. A.; Heidenreich, G.; Johnson, S.
1987-01-01
The Organic Rankine Cycle (ORC) Solar Dynamic Power System (SDPS) is one of the candidates for Space Station prime power application. In the low Earth orbit of the Space Station approximately 34 minutes of the 94-minute orbital period is spent in eclipse with no solar energy input to the power system. For this period the SDPS will use thermal energy storage (TES) material to provide a constant power output. An integrated heat-pipe thermal storage receiver system is being developed as part of the ORC-SDPS solar receiver. This system incorporates potassium heat pipe elements to absorb and transfer the solar energy within the receiver cavity. The heat pipes contain the TES canisters within the potassium vapor space with the toluene heater tube used as the condenser region of the heat pipe. During the insolation period of the Earth orbit, solar energy is delivered to the heat pipe in the ORC-SDPS receiver cavity. The heat pipe transforms the non-uniform solar flux incident in the heat pipe surface within the receiver cavity to an essentially uniform flux at the potassium vapor condensation interface in the heat pipe. During solar insolation, part of the thermal energy is delivered to the heater tube and the balance is stored in the TES units. During the eclipse period of the orbit, the balance stored in the TES units is transferred by the potassium vapor to the toluene heater tube.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kozluk, M.J.; Vijay, D.K.
Postulated catastrophic rupture of high-energy piping systems is the fundamental criterion used for the safety design basis of both light and heavy water nuclear generating stations. Historically, the criterion has been applied by assuming a nonmechanistic instantaneous double-ended guillotine rupture of the largest diameter pipes inside of containment. Nonmechanistic, meaning that the assumption of an instantaneous guillotine rupture has not been based on stresses in the pipe, failure mechanisms, toughness of the piping material, nor the dynamics of the ruptured pipe ends as they separate. This postulated instantaneous double-ended guillotine rupture of a pipe was a convenient simplifying assumption thatmore » resulted in a conservative accident scenario. This conservative accident scenario has now become entrenched as the design basis accident for: containment design, shutdown system design, emergency fuel cooling systems design, and to establish environmental qualification temperature and pressure conditions. The requirement to address dynamic effects associated with the postulated pipe rupture subsequently evolved. The dynamic effects include: potential missiles, pipe whipping, blowdown jets, and thermal-hydraulic transients. Recent advances in fracture mechanics research have demonstrated that certain pipes under specific conditions cannot crack in ways that result in an instantaneous guillotine rupture. Canadian utilities are now using mechanistic fracture mechanics and leak-before-break assessments on a case-by-case basis, in limited applications, to support licensing cases which seek exemption from the need to consider the various dynamic effects associated with postulated instantaneous catastrophic rupture of high-energy piping systems inside and outside of containment.« less
33 CFR 157.122 - Piping, valves, and fittings.
Code of Federal Regulations, 2012 CFR
2012-07-01
...). (f) The piping and equipment of a COW system may not be in machinery spaces. (g) Each hydrant valve... allow movement of the COW system piping as a result of thermal expansion and flexing of the tank vessel...
33 CFR 157.122 - Piping, valves, and fittings.
Code of Federal Regulations, 2014 CFR
2014-07-01
...). (f) The piping and equipment of a COW system may not be in machinery spaces. (g) Each hydrant valve... allow movement of the COW system piping as a result of thermal expansion and flexing of the tank vessel...
33 CFR 157.122 - Piping, valves, and fittings.
Code of Federal Regulations, 2013 CFR
2013-07-01
...). (f) The piping and equipment of a COW system may not be in machinery spaces. (g) Each hydrant valve... allow movement of the COW system piping as a result of thermal expansion and flexing of the tank vessel...
33 CFR 157.122 - Piping, valves, and fittings.
Code of Federal Regulations, 2011 CFR
2011-07-01
...). (f) The piping and equipment of a COW system may not be in machinery spaces. (g) Each hydrant valve... allow movement of the COW system piping as a result of thermal expansion and flexing of the tank vessel...
Best practices for quality management of stormwater pipe construction.
DOT National Transportation Integrated Search
2014-02-01
Stormwater pipe systems are integral features of transportation construction projects. Pipe culverts : direct stormwater away from roadway structures and towards designated discharge areas. The improper : installation of a pipe culvert can result in ...
46 CFR 154.514 - Piping: Electrical bonding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... strap attached by welding or bolting. (2) Two or more bolts that give metal to metal contact between the...
Gas compressor with side branch absorber for pulsation control
Harris, Ralph E [San Antonio, TX; Scrivner, Christine M [San Antonio, TX; Broerman, III, Eugene L.
2011-05-24
A method and system for reducing pulsation in lateral piping associated with a gas compressor system. A tunable side branch absorber (TSBA) is installed on the lateral piping. A pulsation sensor is placed in the lateral piping, to measure pulsation within the piping. The sensor output signals are delivered to a controller, which controls actuators that change the acoustic dimensions of the SBA.
Study on heat pipe assisted thermoelectric power generation system from exhaust gas
NASA Astrophysics Data System (ADS)
Chi, Ri-Guang; Park, Jong-Chan; Rhi, Seok-Ho; Lee, Kye-Bock
2017-11-01
Currently, most fuel consumed by vehicles is released to the environment as thermal energy through the exhaust pipe. Environmentally friendly vehicle technology needs new methods to increase the recycling efficiency of waste exhaust thermal energy. The present study investigated how to improve the maximum power output of a TEG (Thermoelectric generator) system assisted with a heat pipe. Conventionally, the driving energy efficiency of an internal combustion engine is approximately less than 35%. TEG with Seebeck elements is a new idea for recycling waste exhaust heat energy. The TEG system can efficiently utilize low temperature waste heat, such as industrial waste heat and solar energy. In addition, the heat pipe can transfer heat from the automobile's exhaust gas to a TEG. To improve the efficiency of the thermal power generation system with a heat pipe, effects of various parameters, such as inclination angle, charged amount of the heat pipe, condenser temperature, and size of the TEM (thermoelectric element), were investigated. Experimental studies, CFD simulation, and the theoretical approach to thermoelectric modules were carried out, and the TEG system with heat pipe (15-20% charged, 20°-30° inclined configuration) showed the best performance.
16. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARREL BEING LOWERED ...
16. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARREL BEING LOWERED INTO PLACE FOR USE AS PIPE TUNNEL. INEEL PHOTO NUMBER NRTS-59-709. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
18. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARRELS IN PLACE ...
18. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARRELS IN PLACE TO BE USED AS PIPE TUNNELS. INEEL PHOTO NUMBER NRTS-59-925. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
Valve malfunction detection apparatus
NASA Astrophysics Data System (ADS)
Burley, Richard K.
1993-07-01
A detection system is provided for sensing a malfunction of a valve having an outlet connected to an end of a first pipe through which pressurized fluid may be flowed in a downstream direction away from the valve. The system includes a bypass pipe connected at its opposite ends to the first pipe and operative to bypass a portion of the fluid flow therethrough around a predetermined section thereof. A housing is interiorly divided by a flexible diaphragm into first and second opposite chambers which are respectively communicated with the first pipe section and the bypass pipe, the diaphragm being spring-biased toward the second chamber. The diaphragm housing cooperates with check valves and orifices connected in the two pipes to create and maintain a negative pressure in the first pipe section in response to closure of the valve during pressurized flow through the first pipe. A pressure switch senses the negative pressure and transmits a signal indicative thereof to a computer. Upon cessation of the signal while the valve is still closed, the computer responsively generates a signal indicating that the valve, or another portion of the detection system, is leaking.
Valve malfunction detection apparatus
NASA Technical Reports Server (NTRS)
Burley, Richard K. (Inventor)
1993-01-01
A detection system is provided for sensing a malfunction of a valve having an outlet connected to an end of a first pipe through which pressurized fluid may be flowed in a downstream direction away from the valve. The system includes a bypass pipe connected at its opposite ends to the first pipe and operative to bypass a portion of the fluid flow therethrough around a predetermined section thereof. A housing is interiorly divided by a flexible diaphragm into first and second opposite chambers which are respectively communicated with the first pipe section and the bypass pipe, the diaphragm being spring-biased toward the second chamber. The diaphragm housing cooperates with check valves and orifices connected in the two pipes to create and maintain a negative pressure in the first pipe section in response to closure of the valve during pressurized flow through the first pipe. A pressure switch senses the negative pressure and transmits a signal indicative thereof to a computer. Upon cessation of the signal while the valve is still closed, the computer responsively generates a signal indicating that the valve, or another portion of the detection system, is leaking.
High temperature thermal energy storage in steel and sand
NASA Technical Reports Server (NTRS)
Turner, R. H.
1979-01-01
The technical and economic potential for high temperature (343 C, 650 F) thermal energy storage in hollow steel ingots, pipes embedded in concrete, and for pipes buried in sand was evaluated. Because it was determined that concrete would separate from pipes due to thermal stresses, concrete was replaced by sand, which is free from thermal stresses. Variations of the steel ingot concept were not cost effective compared to the sand-pipe approach, therefore, the sand-pipe thermal storage unit (TSU) was evaluated in depth to assess the approximate tube spacing requirements consistent with different system performance characteristics and also attendant system costs. For large TSUs which do not require fast response times, the sand-pipe approach offers attractive possibilities. A pipe diameter about 9 cm (3.5 in) and pipe spacing of approximately 25 cm (10 in), with sand filling the interspaces, appears appropriate. Such a TSU system designed for 8 hours charge/discharge cycle has an energy unit storage cost (CE) of $2.63/kWhr-t and a power unit storage cost (Cp) of $42/kW-t (in 1977 dollars).
Cargo systems manual: Heat Pipe Performance (HPP) STS-66
NASA Technical Reports Server (NTRS)
Napp, Robert
1994-01-01
The purpose of the cargo systems manual (CSM) is to provide a payload reference document for payload and shuttle flight operations personnel during shuttle mission planning, training, and flight operations. It includes orbiter-to-payload interface information and payload system information (including operationally pertinent payload safety data) that is directly applicable to the Mission Operations Directorate (MOD) role in the payload mission. The primary objectives of the heat pipe performance (HPP) are to obtain quantitative data on the thermal performance of heat pipes in a microgravity environment. This information will increase understanding of the behavior of heat pipes in space and be useful for application to design improvements in heat pipes and associated systems. The purpose of HPP-2 is to establish a complete one-g and zero-g data base for axial groove heat pipes. This data will be used to update and correlate data generated from a heat pipe design computer program called Grooved Analysis Program (GAP). The HPP-2 objectives are to: determine heat transport capacity and conductance for open/closed grooved heat pipes and different Freon volumes (nominal, under, and overcharged) using a uniform heat load; determine heat transport capacity and conductance for single/multiple evaporators using asymmetric heat loads; obtain precise static, spin, and rewicking data points for undercharged pipes; investigate heat flux limits (asymmetric heat loads); and determine effects of positive body force on thermal performance.
Minimizing noise in fiberglass aquaculture tanks: Noise reduction potential of various retrofits
Davidson, J.; Frankel, A.S.; Ellison, W.T.; Summerfelt, S.; Popper, A.N.; Mazik, P.; Bebak, J.
2007-01-01
Equipment used in intensive aquaculture systems, such as pumps and blowers can produce underwater sound levels and frequencies within the range of fish hearing. The impacts of underwater noise on fish are not well known, but limited research suggests that subjecting fish to noise could result in impairment of the auditory system, reduced growth rates, and increased stress. Consequently, reducing sound in fish tanks could result in advantages for cultured species and increased productivity for the aquaculture industry. The objective of this study was to evaluate the noise reduction potential of various retrofits to fiberglass fish culture tanks. The following structural changes were applied to tanks to reduce underwater noise: (1) inlet piping was suspended to avoid contact with the tank, (2) effluent piping was disconnected from a common drain line, (3) effluent piping was insulated beneath tanks, and (4) tanks were elevated on cement blocks and seated on insulated padding. Four combinations of the aforementioned structural changes were evaluated in duplicate and two tanks were left unchanged as controls. Control tanks had sound levels of 120.6 dB re 1 ??Pa. Each retrofit contributed to a reduction of underwater sound. As structural changes were combined, a cumulative reduction in sound level was observed. Tanks designed with a combination of retrofits had sound levels of 108.6 dB re 1 ??Pa, a four-fold reduction in sound pressure level. Sound frequency spectra indicated that the greatest sound reductions occurred between 2 and 100 Hz and demonstrated that nearby pumps and blowers created tonal frequencies that were transmitted into the tanks. The tank modifications used during this study were simple and inexpensive and could be applied to existing systems or considered when designing aquaculture facilities. ?? 2007 Elsevier B.V. All rights reserved.
Thermoelectric Power Generation System for Future Hybrid Vehicles Using Hot Exhaust Gas
NASA Astrophysics Data System (ADS)
Kim, Sun-Kook; Won, Byeong-Cheol; Rhi, Seok-Ho; Kim, Shi-Ho; Yoo, Jeong-Ho; Jang, Ju-Chan
2011-05-01
The present experimental and computational study investigates a new exhaust gas waste heat recovery system for hybrid vehicles, using a thermoelectric module (TEM) and heat pipes to produce electric power. It proposes a new thermoelectric generation (TEG) system, working with heat pipes to produce electricity from a limited hot surface area. The current TEG system is directly connected to the exhaust pipe, and the amount of electricity generated by the TEMs is directly proportional to their heated area. Current exhaust pipes fail to offer a sufficiently large hot surface area for the high-efficiency waste heat recovery required. To overcome this, a new TEG system has been designed to have an enlarged hot surface area by the addition of ten heat pipes, which act as highly efficient heat transfer devices and can transmit the heat to many TEMs. As designed, this new waste heat recovery system produces a maximum 350 W when the hot exhaust gas heats the evaporator surface of the heat pipe to 170°C; this promises great possibilities for application of this technology in future energy-efficient hybrid vehicles.
Pollono, Louis P.
1979-01-01
A pipe support for high temperature, thin-walled piping runs such as those used in nuclear systems. A section of the pipe to be supported is encircled by a tubular inner member comprised of two walls with an annular space therebetween. Compacted load-bearing thermal insulation is encapsulated within the annular space, and the inner member is clamped to the pipe by a constant clamping force split-ring clamp. The clamp may be connected to pipe hangers which provide desired support for the pipe.
The visual and radiological inspection of a pipeline using a teleoperated pipe crawler
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fogle, R.F.; Kuelske, K.; Kellner, R.
1995-01-01
In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less
The inspection of a radiologically contaminated pipeline using a teleoperated pipe crawler
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fogle, R.F.; Kuelske, K.; Kellner, R.A.
1995-08-01
In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less
PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E
DOE Office of Scientific and Technical Information (OSTI.GOV)
FARABEE OA; HERZOG B; CAMERON C
2012-02-16
The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft)more » long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.« less
24 CFR 3280.706 - Oil piping systems.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI B 36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded copper or brass pipe in iron pipe sizes may be used. (2) Fittings for oil... Seamless Copper Tube for Air Conditioning and Refrigeration Field Service. (4) Steel tubing shall have a...
24 CFR 3280.705 - Gas piping systems.
Code of Federal Regulations, 2014 CFR
2014-04-01
... consist of one or more of the materials described in § 3280.705(b) (1) through (4). (1) Steel or wrought-iron pipe shall comply with ANSI Standard B36.10-1979, Welded and Seamless Wrought Steel Pipe. Threaded... Specification for Seamless Red Brass Pipe, Standard Sizes. (2) Fittings for gas piping shall be wrought iron...
46 CFR 154.514 - Piping: Electrical bonding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...
46 CFR 154.514 - Piping: Electrical bonding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...
46 CFR 154.514 - Piping: Electrical bonding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...
Multi-stage slurry system used for grinding and polishing materials
Hed, P. Paul; Fuchs, Baruch A.
2001-01-01
A slurry system draws slurry from a slurry tank via one of several intake pipes, where each pipe has an intake opening at a different depth in the slurry. The slurry is returned to the slurry tank via a bypass pipe in order to continue the agitation of the slurry. The slurry is then diverted to a delivery pipe, which supplies slurry to a polisher. The flow of slurry in the bypass pipe is stopped in order for the slurry in the slurry tank to begin to settle. As the polishing continues, slurry is removed from shallower depths in order to pull finer grit from the slurry. When the polishing is complete, the flow in the delivery pipe is ceased. The flow of slurry in the bypass pipe is resumed to start agitating the slurry. In another embodiment, the multiple intake pipes are replaced by a single adjustable pipe. As the slurry is settling, the pipe is moved upward to remove the finer grit near the top of the slurry tank as the polishing process continues.
Thermal Vacuum Testing of Swift XRT Ethane Heat Pipes
NASA Technical Reports Server (NTRS)
Kobel, Mark; Ku, Jentung
2003-01-01
This paper presents the results obtained from a recent ethane heat pipe program. Three identical ethane heat pipes were tested individually, and then two selected heat pipes were tested collectively in their system configuration. Heat transport, thermal conductance, and non-condensable gas tests were performed on each heat pipe. To gain insight into the reflux operation as seen at spacecraft level ground testing, the test fixture was oriented in a vertical configuration. The system level test included a computer-controlled heater designed to emulate the heat load generated at the thermoelectric cooler interface. The system performance was successfully characterized for a wide range of environmental conditions while staying within the operating limits.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nester, Patrick
The rooftop Photovoltaic (PV) panels and radiant piping project was constructed by Fort Mason Center as part of its $21 million comprehensive rehabilitation of the Pier 2 shed which include the shed’s electrical, natural gas and water systems. Fort Mason Center improved performance while reducing energy and water usage and costs to demonstrate the efficiencies and opportunities available to large multi-function facilities. The scalable demand of these facilities required a layered approach to conservation, control and production. The project employed a comprehensive retrofit of electrical natural gas, and plumbing systems to maximize efficiency and lower carbon footprint specifically to demonstratemore » the effectiveness of these strategies in a public setting with varied and diverse use. The project was completed in July 2014 and met the expected outcomes regarding increased comfort and operational efficiency throughout the Pier 2 shed as well as on site electrical generation of current consumption. The entire Pier 2 shed project won a 2015 California Preservation Foundation design award for historic rehabilitation.« less
System-level Analysis of Chilled Water Systems Aboard Naval Ships
2015-06-24
developed one-dimensional partial differen- tial equation models that simulate time-dependent hy- drodynamics and heat transport in a piping network...Thermal zone extents. 2) Piping path and diameter. 3) Specifications and locations of chillers, heat ex- changers, pumps and valves. The framework of the... pipes and provides boundary conditions for the end of the connecting pipes . Pumps, valves, bends and heat exchangers are such components. These
REDUCED COST SEWER PIPE RELINING USING ULTRASONIC TAPE LAMINATION - PHASE I
Water and sewerage pipe rehabilitation represents a critical and expensive infrastructure issue. Although systems currently are available for relining existing pipes and constructing new lined pipes, the proposed advanced technology will improve the quality while substantia...
Optical performance of prototype horn-coupled TES bolometer arrays for SAFARI
NASA Astrophysics Data System (ADS)
Audley, Michael D.; de Lange, Gert; Gao, Jian-Rong; Khosropanah, Pourya; Hijmering, Richard; Ridder, Marcel L.
2016-07-01
The SAFARI Detector Test Facility is an ultra-low background optical testbed for characterizing ultra-sensitive prototype horn-coupled TES bolmeters for SAFARI, the grating spectrometer on board the proposed SPICA satellite. The testbed contains internal cold and hot black-body illuminators and a light-pipe for illumination with an external source. We have added reimaging optics to facilitate array optical measurements. The system is now being used for optical testing of prototype detector arrays read out with frequency-domain multiplexing. We present our latest optical measurements of prototype arrays and discuss these in terms of the instrument performance.
49 CFR 193.2503 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... pressure so that the resultant gas is within limits established for the vaporizer and the downstream piping...
NASA Astrophysics Data System (ADS)
Liang, Feng; Yang, Xiao-Dong; Zhang, Wei; Qian, Ying-Jing
2018-03-01
In this paper, a dynamical model of simply-supported spinning pipes conveying fluid with axial deployment is proposed and the transverse free vibration and stability for such a doubly gyroscopic system involving time-dependent parameters are investigated. The partial differential equations of motion are derived by the extended Hamilton principle and then truncated by the Galerkin technique. The time-variant frequencies, mode shapes and responses to initial conditions are comprehensively investigated to reveal the dynamical essence of the system. It is indicated that the qualitative stability evolution of the system mainly depends on the effect of fluid-structure interaction (FSI), while the spinning motion will enhance the pipe rigidity and eliminate the buckling instability. The dynamical evolution of a retracting pipe is almost inverse to that of the deploying one. The pipe possesses different mode configurations of spatial curves as the pipe length increases and some modal and response characteristics of the present system are found rather distinct from those of deploying cantilevered structures.
Passive environmental temperature control system
Corliss, John M.; Stickford, George H.
1981-01-01
Passive environmental heating and cooling systems are described, which utilize heat pipes to transmit heat to or from a thermal reservoir. In a solar heating system, a heat pipe is utilized to carry heat from a solar heat absorber plate that receives sunlight, through a thermal insulation barrier, to a heat storage wall, with the outer end of the pipe which is in contact with the solar absorber being lower than the inner end. The inclining of the heat pipe assures that the portion of working fluid, such as Freon, which is in a liquid phase will fall by gravity to the outer end of the pipe, thereby assuring diode action that prevents the reverse transfer of heat from the reservoir to the outside on cool nights. In a cooling system, the outer end of the pipe which connects to a heat dissipator, is higher than the inner end that is coupled to a cold reservoir, to allow heat transfer only out of the reservoir to the heat dissipator, and not in the reverse direction.
NASA Technical Reports Server (NTRS)
Cepeda-Rizo, Juan; Krylo, Robert; Fisher, Melanie; Bugby, David C.
2011-01-01
Camera cooling for SIM presents three thermal control challenges; stable operation at 163K (110 C), decontamination heating to +20 C, and a long span from the cameras to the radiator. A novel cryogenic cooling system based on a methane heat pipe meets these challenges. The SIM thermal team, with the help of heat pipe vendor ATK, designed and tested a complete, low temperature, cooling system. The system accommodates the two SIM cameras with a double-ended conduction bar, a single methane heat pipe, independent turn-off devices, and a flight-like radiator. The turn ]off devices consist of a liquid trap, for removing the methane from the pipe, and an electrical heater to raise the methane temperature above the critical point thus preventing two-phase operation. This is the first time a cryogenic heat pipe has been tested at JPL and is also the first heat pipe to incorporate the turn-off features. Operation at 163K with a methane heat pipe is an important new thermal control capability for the lab. In addition, the two turn-off technologies enhance the "bag of tricks" available to the JPL thermal community. The successful test program brings this heat pipe to a high level of technology readiness.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-30 Piping. (a) All piping, valves, and fittings of ferrous materials shall be... piping, valves, fittings, and sprinkler heads shall be securely supported, and, where necessary...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-30 Piping. (a) All piping, valves, and fittings of ferrous materials shall be... piping, valves, fittings, and sprinkler heads shall be securely supported, and, where necessary...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-30 Piping. (a) All piping, valves, and fittings of ferrous materials shall be... piping, valves, fittings, and sprinkler heads shall be securely supported, and, where necessary...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-30 Piping. (a) All piping, valves, and fittings of ferrous materials shall be... piping, valves, fittings, and sprinkler heads shall be securely supported, and, where necessary...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-30 Piping. (a) All piping, valves, and fittings of ferrous materials shall be... piping, valves, fittings, and sprinkler heads shall be securely supported, and, where necessary...
46 CFR 56.35-1 - Pipe stress calculations (replaces 119.7).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Pipe stress calculations (replaces 119.7). 56.35-1... PIPING SYSTEMS AND APPURTENANCES Expansion, Flexibility and Supports § 56.35-1 Pipe stress calculations (replaces 119.7). (a) A summary of the results of pipe stress calculations for the main and auxiliary steam...
46 CFR 56.35-1 - Pipe stress calculations (replaces 119.7).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Pipe stress calculations (replaces 119.7). 56.35-1... PIPING SYSTEMS AND APPURTENANCES Expansion, Flexibility and Supports § 56.35-1 Pipe stress calculations (replaces 119.7). (a) A summary of the results of pipe stress calculations for the main and auxiliary steam...
46 CFR 56.35-1 - Pipe stress calculations (replaces 119.7).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Pipe stress calculations (replaces 119.7). 56.35-1... PIPING SYSTEMS AND APPURTENANCES Expansion, Flexibility and Supports § 56.35-1 Pipe stress calculations (replaces 119.7). (a) A summary of the results of pipe stress calculations for the main and auxiliary steam...
46 CFR 56.35-1 - Pipe stress calculations (replaces 119.7).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Pipe stress calculations (replaces 119.7). 56.35-1... PIPING SYSTEMS AND APPURTENANCES Expansion, Flexibility and Supports § 56.35-1 Pipe stress calculations (replaces 119.7). (a) A summary of the results of pipe stress calculations for the main and auxiliary steam...
46 CFR 56.35-1 - Pipe stress calculations (replaces 119.7).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Pipe stress calculations (replaces 119.7). 56.35-1... PIPING SYSTEMS AND APPURTENANCES Expansion, Flexibility and Supports § 56.35-1 Pipe stress calculations (replaces 119.7). (a) A summary of the results of pipe stress calculations for the main and auxiliary steam...
1978-08-01
21- accepts piping geometry as one of its basic inputs; whether this geometry comes from arrangement drawings or models is of no real consequence. c ... computer . Geometric data is taken from the catalogue and automatically merged with the piping geometry data. Also, fitting orientation is automatically...systems require a number of data manipulation routines to convert raw digitized data into logical pipe geometry acceptable to a computer -aided piping design
Pressure suppression containment system for boiling water reactor
Gluntz, Douglas M.; Nesbitt, Loyd B.
1997-01-01
A system for suppressing the pressure inside the containment of a BWR following a postulated accident. A piping subsystem is provided which features a main process pipe that communicates the wetwell airspace to a connection point downstream of the guard charcoal bed in an offgas system and upstream of the main bank of delay charcoal beds which give extensive holdup to offgases. The main process pipe is fitted with both inboard and outboard containment isolation valves. Also incorporated in the main process pipe is a low-differential-pressure rupture disk which prevents any gas outflow in this piping whatsoever until or unless rupture occurs by virtue of pressure inside this main process pipe on the wetwell airspace side of the disk exceeding the design opening (rupture) pressure differential. The charcoal holds up the radioactive species in the noncondensable gas from the wetwell plenum by adsorption, allowing time for radioactive decay before the gas is vented to the environs.
Sodium heat pipe use in solar Stirling power conversion systems
NASA Astrophysics Data System (ADS)
Zimmerman, W. F.; Divakaruni, S. M.; Won, Y. S.
1980-08-01
Sodium heat pipes were selected for use as a thermal transport method in a focus-mounted, distributed concentrator solar Stirling power conversion system intended to produce 15-20 kWe per unit. Heat pipes were used both to receive thermal power in the solar receiver and to transmit it to a secondary heat pipe containing both latent heat salt (for up to 1.25 hours of thermal storage) and the heat exchanger of the Stirling engine. Experimental tests were performed on five solar receiver heat pipes with various internal wicking configurations. The performance of the heat pipes at various power levels and operating attitudes was investigated at temperatures near 1550 F; the unidirectional heat transfer in these heat pipes was demonstrated in normal operating attitudes and particularly in the inverted position required during overnight stowage of the concentrator.
Sodium heat pipe use in solar Stirling power conversion systems
NASA Technical Reports Server (NTRS)
Zimmerman, W. F.; Divakaruni, S. M.; Won, Y. S.
1980-01-01
Sodium heat pipes were selected for use as a thermal transport method in a focus-mounted, distributed concentrator solar Stirling power conversion system intended to produce 15-20 kWe per unit. Heat pipes were used both to receive thermal power in the solar receiver and to transmit it to a secondary heat pipe containing both latent heat salt (for up to 1.25 hours of thermal storage) and the heat exchanger of the Stirling engine. Experimental tests were performed on five solar receiver heat pipes with various internal wicking configurations. The performance of the heat pipes at various power levels and operating attitudes was investigated at temperatures near 1550 F; the unidirectional heat transfer in these heat pipes was demonstrated in normal operating attitudes and particularly in the inverted position required during overnight stowage of the concentrator.
Maximal design basis accident of fusion neutron source DEMO-TIN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kolbasov, B. N., E-mail: Kolbasov-BN@nrcki.ru
2015-12-15
When analyzing the safety of nuclear (including fusion) facilities, the maximal design basis accident at which the largest release of activity is expected must certainly be considered. Such an accident is usually the failure of cooling systems of the most thermally stressed components of a reactor (for a fusion facility, it is the divertor or the first wall). The analysis of safety of the ITER reactor and fusion power facilities (including hybrid fission–fusion facilities) shows that the initial event of such a design basis accident is a large-scale break of a pipe in the cooling system of divertor or themore » first wall outside the vacuum vessel of the facility. The greatest concern is caused by the possibility of hydrogen formation and the inrush of air into the vacuum chamber (VC) with the formation of a detonating mixture and a subsequent detonation explosion. To prevent such an explosion, the emergency forced termination of the fusion reaction, the mounting of shutoff valves in the cooling systems of the divertor and the first wall or blanket for reducing to a minimum the amount of water and air rushing into the VC, the injection of nitrogen or inert gas into the VC for decreasing the hydrogen and oxygen concentration, and other measures are recommended. Owing to a continuous feed-out of the molten-salt fuel mixture from the DEMO-TIN blanket with the removal period of 10 days, the radioactivity release at the accident will mainly be determined by tritium (up to 360 PBq). The activity of fission products in the facility will be up to 50 PBq.« less
Experimental Investigation of A Heat Pipe-Assisted Latent Heat Thermal Energy Storage System
NASA Astrophysics Data System (ADS)
Tiari, Saeed; Mahdavi, Mahboobe; Qiu, Songgang
2016-11-01
In the present work, different operation modes of a latent heat thermal energy storage system assisted by a heat pipe network were studied experimentally. Rubitherm RT55 enclosed by a vertical cylindrical container was used as the Phase Change Material (PCM). The embedded heat pipe network consisting of a primary heat pipe and an array of four secondary heat pipes were employed to transfer heat to the PCM. The primary heat pipe transports heat from the heat source to the heat sink. The secondary heat pipes transfer the extra heat from the heat source to PCM during charging process or retrieve thermal energy from PCM during discharging process. The effects of heat transfer fluid (HTF) flow rate and temperature on the thermal performance of the system were investigated for both charging and discharging processes. It was found that the HTF flow rate has a significant effect on the total charging time of the system. Increasing the HTF flow rate results in a remarkable increase in the system input thermal power. The results also showed that the discharging process is hardly affected by the HTF flow rate but HTF temperature plays an important role in both charging and discharging processes. The authors would like to acknowledge the financial supports by Temple University for the project.
Heat pipe life and processing study
NASA Technical Reports Server (NTRS)
Antoniuk, D.; Luedke, E. E.
1979-01-01
The merit of adding water to the reflux charge in chemically and solvent cleaned aluminum/slab wick/ammonia heat pipes was evaluated. The effect of gas in the performance of three heat pipe thermal control systems was found significant in simple heat pipes, less significant in a modified simple heat pipe model with a short wickless pipe section. Use of gas data for the worst and best heat pipes of the matrix in a variable conductance heat pipe model showed a 3 C increase in the source temperature at full on condition after 20 and 246 years, respectively.
The Collection of Ice in Jet A-1 Fuel Pipes
NASA Astrophysics Data System (ADS)
Maloney, Thomas C.
Ice collection and blockages in fuel systems have been of interest to the aerospace community since their discovery in the late 1950's when a B-52 crashed. A recent growth of interest was provoked by several incidents that occurred within the last few years. This study seeks to understand the underlying principles of ice growth in fuel flow systems. Tests were performed in a recirculated fuel system with a fuel tank that held approximately 115 gallons of Jet A-1 fuel and ice accumulation was observed in two removable test pipes. The setup was in an altitude chamber capable of -60 °F and the experiments involved full scale flow components. Initially, tests were done to better understand the system and variables that effected accumulation. First, initial conditions within the test pipes were varied. Next, pipe geometry, pipe surface properties, initial water content of the fuel and heat transfer from the fuel pipe were varied. As a result of the tests, observations were made about other effects involved in the study. The effects include: the result of sequentially run tests, the effect of the fuel on the freezing temperature of the entrained water, the effect of ice accumulation on pipe welds, and the effect of the test pipe entrance and exit flow conditions on ice accumulation. The results of initial tests were qualitative. Later quantitative tests were done to demonstrate the dependence of temperature, Reynolds number, and heat transfer on ice accumulation. Tests were quantified with a pressure increase across the pipe sections that was normalized by the expected theoretical initial pressure. As a result of these tests the effect of contamination in the fuel was revealed. For ease of reference, the initial tests were called "stage I" and the later tests were called "stage II". The results of stage I showed that accumulation of soft ice was greatest when a layer of hard ice had initially formed on the pipe surface. Stainless steel collected more ice than Teflon® and there was a lack of a preferential accumulation region downstream of a pipe bend. A greater heat transfer from the pipe increased ice accumulation for aluminum that was made rough with 80 grit sand paper, and for Teflon®. Water was shown to collect in the pipe system as the number of tests increased and the freeze temperature of either the hard or soft ice was about 0 °C. Finally, results of "stage I" tests showed that stainless steel pipe welds were a preferred sight for ice to accumulate. Repeatability was done first in stage II and the normalized pressure increase for two 3/42 un-insulated pipe tests were within 7%. Normalized pressure increase across a pipe was shown to increase as Reynolds number decreased. A 50% increase in Reynolds number led to a 40% decrease in characteristic normalized pressure increase (CNPI). Tests were done at three temperatures and ice accumulated the most at -11 °C. The CNPI at -11 °C was about three times greater than the CNPI at -7.4 °C and about sixty times greater than the CNPI at -19.4 C. A greater heat transfer from the fuel pipe increased ice accumulation. For the amount of time that the tests ran, the total normalized pressure increase was about .9 greater for an un-insulated pipe than for an insulated pipe. Contamination in the fuel increased the amount of soft ice that collected in the system. The CNPI for the more contaminated fuel was more than double the case with less contaminated fuel. Possible solutions for the prevention or decrease of ice accumulation in aircraft fuel systems based on the results of this study are insulated pipes, a change in the type of pipe material, a higher fuel flow rate and cleaner fuel. The fuel temperature could also be altered to avoid temperatures where the most ice accumulates.
Intermediate Temperature Water Heat Pipe Tests
NASA Technical Reports Server (NTRS)
Devarakonda, Angirasa; Xiong, Da-Xi; Beach, Duane E.
2005-01-01
Heat pipes are among the most promising technologies for space radiator systems. Water heat pipes are explored in the intermediate temperature range of 400 to above 500 K. The thermodynamic and thermo-physical properties of water are reviewed in this temperature range. Test data are reported for a copper-water heat pipe. The heat pipe was tested under different orientations. Water heat pipes show promise in this temperature range. Fabrication and testing issues are being addressed.
Mineralogical Evidence of Galvanic Corrosion in Domestic, Drinking Water Pipes
Drinking water distribution system (DWDS) piping contains numerous examples of galvanically-coupled metals (e.g., soldered copper pipe joints, copper-lead pipes joined during partial replacements of lead service lines). The possible role of galvanic corrosion in the release of l...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-20 Piping. (a) All piping, valves, and fittings shall meet the applicable... the Commandant. (c) All piping, valves, fittings, and sprinkler heads shall be securely supported, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-20 Piping. (a) All piping, valves, and fittings shall meet the applicable... the Commandant. (c) All piping, valves, fittings, and sprinkler heads shall be securely supported, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-20 Piping. (a) All piping, valves, and fittings shall meet the applicable... the Commandant. (c) All piping, valves, fittings, and sprinkler heads shall be securely supported, and...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-20 Piping. (a) All piping, valves, and fittings shall meet the applicable... the Commandant. (c) All piping, valves, fittings, and sprinkler heads shall be securely supported, and...
Corrosion potential analysis system
NASA Astrophysics Data System (ADS)
Kiefer, Karl F.
1998-03-01
Many cities in the northeastern U.S. transport electrical power from place to place via underground cables, which utilize voltages from 68 kv to 348 kv. These cables are placed in seamless steel pipe to protect the conductors. These buried pipe-type-cables (PTCs) are carefully designed and constantly pressurized with transformer oil to prevent any possible contamination. A protective coating placed on the outside diameter of the pipe during manufacture protects the steel pipe from the soil environment. Notwithstanding the protection mechanisms available, the pipes remain vulnerable to electrochemical corrosion processes. If undetected, corrosion can cause the pipes to leak transformer oil into the environment. These leaks can assume serious proportions due to the constant pressure on the inside of the pipe. A need exists for a detection system that can dynamically monitor the corrosive potential on the length of the pipe and dynamically adjust cathodic protection to counter local and global changes in the cathodic environment surrounding the pipes. The northeastern United States contains approximately 1000 miles of this pipe. This milage is critical to the transportation and distribution of power. So critical, that each of the pipe runs has a redundant double running parallel to it. Invocon, Inc. proposed and tested a technically unique and cost effective solution to detect critical corrosion potential and to communicate that information to a central data collection and analysis location. Invocon's solution utilizes the steel of the casing pipe as a communication medium. Each data gathering station on the pipe can act as a relay for information gathered elsewhere on the pipe. These stations must have 'smart' network configuration algorithms that constantly test various communication paths and determine the best and most power efficient route through which information should flow. Each network station also performs data acquisition and analysis tasks that ultimately determine the corrosion risk in a local area. The system has virtually no installation costs and can operate on battery power for at least two years.
Clastic Pipes on Mars: Evidence for a Near Surface Groundwater System
NASA Astrophysics Data System (ADS)
Wheatley, D. F.; Chan, M. A.; Okubo, C. H.
2017-12-01
Clastic pipes, a type of vertical, columnar injectite, occur throughout the terrestrial stratigraphic record and are identified across many Martian terrains. Terrestrial pipe analogs can aid in identifying clastic pipes on Mars to understand their formation processes and their implications for a past near-surface groundwater system. On Earth, clastic pipes form through fluidization of overpressurized sediment. Fluidization occurs when the upward frictional (i.e., drag) forces of escaping fluids overpower the downward acting gravitational force. To create the forces necessary for pipe formation requires overpressurization of a body of water-saturated porous media overlain by a low permeability confining layer. As the pressure builds, the confining layer eventually fractures and the escaping fluids fluidize the porous sediment causing the sediment to behave like a fluid. These specific formation conditions record evidence of a violent release of fluid-suspended sediment including brecciation of the host and sealing material, internal outward grading/sorting that results in a coarser-grained commonly better cemented outer rind, traction structures, and a cylindrical geometry. Pipes form self-organized, dispersed spatial relationships due to the efficient diffusion of overpressured zones in the subsurface and the expulsion of sediment under pressure. Martian pipes occur across the northern lowlands, dichotomy boundary, and southern highlands in various forms of erosional relief ranging from newer eruption structures to eroded cylindrical/conical mounds with raised rims to highly eroded mounds/hills. Similar to terrestrial examples, Martian pipes form in evenly-spaced, self-organized arrangements. The pipes are typically internally massive with a raised outer rim (interpreted as a sorted, coarser-grained, better-cemented rim). This evidence indicates that Martian pipes formed through fluidization, which requires a near-surface groundwater system. Pipes create a window into the subsurface by excavating subsurface sediment and waters. After emplacement, pipes can also act as fluid conduits, channeling post-depositional fluid flow. The preferential porosity and flow paths may make the pipes an ideal exploration target for microbial life.
Heat pipes for terrestrial applications in dehumidification systems
NASA Technical Reports Server (NTRS)
Khattar, Mukesh K.
1988-01-01
A novel application of heat pipes which greatly enhances dehumidification performance of air-conditioning systems is presented. When an air-to-air heat pipe heat exchanger is placed between the warm return air and cold supply air streams of an air conditioner, heat is efficiently transferred from the return air to the supply air. As the warm return air precools during this process, it moves closer to its dew-point temperature. Therefore, the cooling system works less to remove moisture. This paper discusses the concept, its benefits, the challenges of incorporating heat pipes in an air-conditioning system, and the preliminary results from a field demonstration of an industrial application.
Heat Rejection Concepts for Brayton Power Conversion Systems
NASA Technical Reports Server (NTRS)
Siamidis, John; Mason, Lee; Beach, Duane; Yuko, James
2005-01-01
This paper describes potential heat rejection design concepts for closed Brayton cycle (CBC) power conversion systems. Brayton conversion systems are currently under study by NASA for Nuclear Electric Propulsion (NEP) applications. The Heat Rejection Subsystem (HRS) must dissipate waste heat generated by the power conversion system due to inefficiencies in the thermal-to-electric conversion process. Space Brayton conversion system designs tend to optimize at efficiencies of about 20 to 25 percent with radiator temperatures in the 400 to 600 K range. A notional HRS was developed for a 100 kWe-class Brayton power system that uses a pumped sodium-potassium (NaK) heat transport loop coupled to a water heat pipe radiator. The radiator panels employ a sandwich construction consisting of regularly-spaced circular heat pipes contained within two composite facesheets. Heat transfer from the NaK fluid to the heat pipes is accomplished by inserting the evaporator sections into the NaK duct channel. The paper evaluates various design parameters including heat pipe diameter, heat pipe spacing, and facesheet thickness. Parameters were varied to compare design options on the basis of NaK pump pressure rise and required power, heat pipe unit power and radial flux, radiator panel areal mass, and overall HRS mass.
Heat pipe radiator technology for space power systems
NASA Technical Reports Server (NTRS)
Carlson, A. W.; Gustafson, E.; Ercegovic, B. A.
1986-01-01
High-reliability high-performance deployable monogroove and dual-slot heat pipe radiator systems to meet the requirements for electric power in future space missions, such as the 300-kW(e) electric powder demand projected for NASA's Space Station, are discussed. Analytical model trade studies of various configurations show the advantages of the dual-slot heat pipe radiator for high temperature applications as well as its weight reduction potential over the 50-350 F temperature range. The ammonia-aluminum monogroove heat pipe, limited to below-180 F operating temperatures, is under development, and can employ methanol-stainless steel heat pipes to achieve operating temperatures in excess of 300 F. Dual-slot heat pipe configuration proof-of-concept testing was begun in 1985.
Mixing at double-Tee junctions with unequal pipe sizes in water distribution systems
Pipe flow mixing with various solute concentrations and flow rates at pipe junctions is investigated. The degree of mixing affects the spread of contaminants in a water distribution system. Many studies have been conducted on the mixing at the cross junctions. Yet a few have focu...
46 CFR 108.449 - Piping tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Piping tests. 108.449 Section 108.449 Shipping COAST... Fire Extinguishing Systems Fixed Carbon Dioxide Fire Extinguishing Systems § 108.449 Piping tests. (a) Each test prescribed in (b), (c), and (d) of this section must be performed upon completion of the...
46 CFR 154.528 - Piping joints: Flange type.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and Process Piping Systems § 154.528 Piping joints: Flange type. (a) A flange must be one of the following types: (1) Welding neck. (2) Slip-on. (3) Socket weld. (b) If the piping is designed for a... less; or (3) Welding neck. (c) If the piping is designed for a temperature lower than −55 °C (−67 °F...
Dynamics of the inlet system of a four-stroke engine
NASA Technical Reports Server (NTRS)
Boden, R H; Schecter, Harry
1944-01-01
Tests were run on a single-cylinder and a multicylinder four-stroke engine in order to determine the effect of the dynamics of the inlet system upon indicated mean effective pressure. Tests on the single-cylinder engine were made at various speeds, inlet valve timings, and inlet pipe lengths. These tests indicated that the indicated mean effective pressure could be raised considerably at any one speed by the use of a suitably long inlet pipe. Tests at other speeds with this length of pipe showed higher indicated mean effective pressure than with a very short pipe, although not so high as could be obtained with the pipe length adjusted for each speed. A general relation was discovered between optimum time of inlet valve closing and pipe length; namely, that longer pipes require later inlet valve closing in order to be fully effective. Tests were also made on three cylinders connected to a single pipe. With this arrangement, increased volumetric efficiency at low speed was obtainable by using a long pipe, but only with a sacrifice of volumetric efficiency at high speed. Volumetric efficiency at high speed was progressively lower as the pipe length was increased.
Experimental Verification of Steel Pipe Collapse under Vacuum Pressure Conditions
NASA Astrophysics Data System (ADS)
Autrique, R.; Rodal, E.
2016-11-01
Steel pipes are used widely in hydroelectric systems and in pumping systems. Both systems are subject to hydraulic transient effects caused by changes in boundary conditions, such as sudden valve closures, pump failures, or accidents. Water column separation, and its associated vaporization pressure inside the pipe, can cause the collapse of thin walled steel pipes subject to atmospheric pressure, as happened during the well known Oigawa Power Plant accident in Japan, in 1950. The conditions under which thin walled pipes subject to external pressure can collapse have been studied mathematically since the second half of the XIX century, with classical authors Southwell and Von Mises obtaining definitive equations for long and short pipes in the second decade of the XX century, in which the fundamental variables are the diameter to thickness ratio D/t and the length to diameter ratio L/D. In this paper, the predicted critical D/t ratio for steel pipe collapse is verified experimentally, in a physical model able to reproduce hydraulic transients, generating vacuum pressures through rapid upstream valve closures.
Friction loss in straight pipes of unplasticized polyvinyl chloride.
Iwasaki, T; Ojima, J
1996-01-01
In order to design proper ductwork for a local exhaust system, airflow characteristics were investigated in straight pipes of unplasticized polyvinyl chloride (PVC). A linear decrease in static pressure was observed downstream at points from the opening of the VU pipes (JIS K 6741) located at distances greater than 10 times the pipe diameter, for velocities ranging between 10.18-36.91 m/s. Roughness inside pipes with small diameters was found to be 0.0042-0.0056 mm and the friction factor was calculated on the basis of Colebrook's equation for an airflow transition zone. An extended friction chart was then constructed on the basis of the roughness value and the friction factor. This chart can be applied when designing a local exhaust system with the ducts of diameters ranging from 40 to 900 mm. The friction loss of the PVC pipe was found to be approximately 2/3 of that of a galvanized steel pipe.
Sodium Based Heat Pipe Modules for Space Reactor Concepts: Stainless Steel SAFE-100 Core
NASA Technical Reports Server (NTRS)
Martin, James J.; Reid, Robert S.
2004-01-01
A heat pipe cooled reactor is one of several candidate reactor cores being considered for advanced space power and propulsion systems to support future space exploration applications. Long life heat pipe modules, with designs verified through a combination of theoretical analysis and experimental lifetime evaluations, would be necessary to establish the viability of any of these candidates, including the heat pipe reactor option. A hardware-based program was initiated to establish the infrastructure necessary to build heat pipe modules. This effort, initiated by Los Alamos National Laboratory and referred to as the Safe Affordable Fission Engine (SAFE) project, set out to fabricate and perform non-nuclear testing on a modular heat pipe reactor prototype that can provide 100 kilowatt from the core to an energy conversion system at 700 C. Prototypic heat pipe hardware was designed, fabricated, filled, closed-out and acceptance tested.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yu, Y.J.; Sohn, G.H.; Kim, Y.J.
Typical LBB (Leak-Before-Break) analysis is performed for the highest stress location for each different type of material in the high energy pipe line. In most cases, the highest stress occurs at the nozzle and pipe interface location at the terminal end. The standard finite element analysis approach to calculate J-Integral values at the crack tip utilizes symmetry conditions when modeling near the nozzle as well as away from the nozzle region to minimize the model size and simplify the calculation of J-integral values at the crack tip. A factor of two is typically applied to the J-integral value to accountmore » for symmetric conditions. This simplified analysis can lead to conservative results especially for small diameter pipes where the asymmetry of the nozzle-pipe interface is ignored. The stiffness of the residual piping system and non-symmetries of geometry along with different material for the nozzle, safe end and pipe are usually omitted in current LBB methodology. In this paper, the effects of non-symmetries due to geometry and material at the pipe-nozzle interface are presented. Various LBB analyses are performed for a small diameter piping system to evaluate the effect a nozzle has on the J-integral calculation, crack opening area and crack stability. In addition, material differences between the nozzle and pipe are evaluated. Comparison is made between a pipe model and a nozzle-pipe interface model, and a LBB PED (Piping Evaluation Diagram) curve is developed to summarize the results for use by piping designers.« less
Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline
NASA Astrophysics Data System (ADS)
Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.
2017-05-01
In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.
46 CFR 154.516 - Piping: Hull protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Piping: Hull protection. 154.516 Section 154.516 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... and Process Piping Systems § 154.516 Piping: Hull protection. A vessel's hull must be protected from...
Measurements of terahertz radiation generated using a metallic, corrugated pipe
Bane, Karl; Stupakov, Gennady; Antipov, Sergey; ...
2016-11-23
Here, a method for producing narrow-band THz radiation proposes passing an ultra-relativistic beam through a metallic pipe with small periodic corrugations. We present results of a measurement of such an arrangement at Brookhaven's Accelerator Test Facility (ATF). Our pipe was copper and was 5 cm long; the aperture was cylindrically symmetric, with a 1 mm (radius) bore and a corrugation depth (peak-to-peak) of 60 µm. In the experiment we measured both the effect on the beam of the structure wakefield and the spectral properties of the radiation excited by the beam. We began by injecting a relatively long beam comparedmore » to the wavelength of the radiation, but with short rise time, to excite the structure, and then used a downstream spectrometer to infer the radiation wavelength. This was followed by injecting a shorter bunch, and then using an interferometer (also downstream of the corrugated pipe) to measure the spectrum of the induced THz radiation. For the THz pulse we obtain and compare with calculations: the central frequency, the bandwidth, and the spectral power—compared to a diffraction radiation background signal.« less
Measurements of terahertz radiation generated using a metallic, corrugated pipe
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bane, Karl; Stupakov, Gennady; Antipov, Sergey
Here, a method for producing narrow-band THz radiation proposes passing an ultra-relativistic beam through a metallic pipe with small periodic corrugations. We present results of a measurement of such an arrangement at Brookhaven's Accelerator Test Facility (ATF). Our pipe was copper and was 5 cm long; the aperture was cylindrically symmetric, with a 1 mm (radius) bore and a corrugation depth (peak-to-peak) of 60 µm. In the experiment we measured both the effect on the beam of the structure wakefield and the spectral properties of the radiation excited by the beam. We began by injecting a relatively long beam comparedmore » to the wavelength of the radiation, but with short rise time, to excite the structure, and then used a downstream spectrometer to infer the radiation wavelength. This was followed by injecting a shorter bunch, and then using an interferometer (also downstream of the corrugated pipe) to measure the spectrum of the induced THz radiation. For the THz pulse we obtain and compare with calculations: the central frequency, the bandwidth, and the spectral power—compared to a diffraction radiation background signal.« less
Heat Pipe-Assisted Thermoelectric Power Generation Technology for Waste Heat Recovery
NASA Astrophysics Data System (ADS)
Jang, Ju-Chan; Chi, Ri-Guang; Rhi, Seok-Ho; Lee, Kye-Bock; Hwang, Hyun-Chang; Lee, Ji-Su; Lee, Wook-Hyun
2015-06-01
Currently, large amounts of thermal energy dissipated from automobiles are emitted through hot exhaust pipes. This has resulted in the need for a new efficient recycling method to recover energy from waste hot exhaust gas. The present experimental study investigated how to improve the power output of a thermoelectric generator (TEG) system assisted by a wickless loop heat pipe (loop thermosyphon) under the limited space of the exhaust gas pipeline. The present study shows a novel loop-type heat pipe-assisted TEG concept to be applied to hybrid vehicles. The operating temperature of a TEG's hot side surface should be as high as possible to maximize the Seebeck effect. The present study shows a novel TEG concept of transferring heat from the source to the sink. This technology can transfer waste heat to any local place with a loop-type heat pipe. The present TEG system with a heat pipe can transfer heat and generate an electromotive force power of around 1.3 V in the case of 170°C hot exhaust gas. Two thermoelectric modules (TEMs) for a conductive block model and four Bi2Te3 TEMs with a heat pipe-assisted model were installed in the condenser section. Heat flows to the condenser section from the evaporator section connected to the exhaust pipe. This novel TEG system with a heat pipe can be placed in any location on an automobile.
Effect of PVC and iron materials on Mn(II) deposition in drinking water distribution systems.
Cerrato, José M; Reyes, Lourdes P; Alvarado, Carmen N; Dietrich, Andrea M
2006-08-01
Polyvinyl chloride (PVC) and iron pipe materials differentially impacted manganese deposition within a drinking water distribution system that experiences black water problems because it receives soluble manganese from a surface water reservoir that undergoes biogeochemical cycling of manganese. The water quality study was conducted in a section of the distribution system of Tegucigalpa, Honduras and evaluated the influence of iron and PVC pipe materials on the concentrations of soluble and particulate iron and manganese, and determined the composition of scales formed on PVC and iron pipes. As expected, total Fe concentrations were highest in water from iron pipes. Water samples obtained from PVC pipes showed higher total Mn concentrations and more black color than that obtained from iron pipes. Scanning electron microscopy demonstrated that manganese was incorporated into the iron tubercles and thus not readily dislodged from the pipes by water flow. The PVC pipes contained a thin surface scale consisting of white and brown layers of different chemical composition; the brown layer was in contact with the water and contained 6% manganese by weight. Mn composed a greater percentage by weight of the PVC scale than the iron pipe scale; the PVC scale was easily dislodged by flowing water. This research demonstrates that interactions between water and the infrastructure used for its supply affect the quality of the final drinking water.
Heat pipe systems using new working fluids
NASA Technical Reports Server (NTRS)
Chao, David F. (Inventor); Zhang, Nengli (Inventor)
2004-01-01
The performance of a heat pipe system is greatly improved by the use of a dilute aqueous solution of about 0.0005 and about 0.005 moles per liter of a long chain alcohol as the working fluid. The surface tension-temperature gradient of the long-chain alcohol solutions turns positive as the temperature exceeds a certain value, for example about 40.degree. C. for n-heptanol solutions. Consequently, the Marangoni effect does not impede, but rather aids in bubble departure from the heating surface. Thus, the bubble size at departure is substantially reduced at higher frequencies and, therefore, increases the boiling limit of heat pipes. This feature is useful in microgravity conditions. In addition to microgravity applications, the heat pipe system may be used for commercial, residential and vehicular air conditioning systems, micro heat pipes for electronic devices, refrigeration and heat exchangers, and chemistry and cryogenics.
NASA Astrophysics Data System (ADS)
Tiari, Saeed
A desirable feature of concentrated solar power (CSP) with integrated thermal energy storage (TES) unit is to provide electricity in a dispatchable manner during cloud transient and non-daylight hours. Latent heat thermal energy storage (LHTES) offers many advantages such as higher energy storage density, wider range of operating temperature and nearly isothermal heat transfer relative to sensible heat thermal energy storage (SHTES), which is the current standard for trough and tower CSP systems. Despite the advantages mentioned above, LHTES systems performance is often limited by low thermal conductivity of commonly used, low cost phase change materials (PCMs). Research and development of passive heat transfer devices, such as heat pipes (HPs) to enhance the heat transfer in the PCM has received considerable attention. Due to its high effective thermal conductivity, heat pipe can transport large amounts of heat with relatively small temperature difference. The objective of this research is to study the charging and discharging processes of heat pipe-assisted LHTES systems using computational fluid dynamics (CFD) and experimental testing to develop a method for more efficient energy storage system design. The results revealed that the heat pipe network configurations and the quantities of heat pipes integrated in a thermal energy storage system have a profound effect on the thermal response of the system. The optimal placement of heat pipes in the system can significantly enhance the thermal performance. It was also found that the inclusion of natural convection heat transfer in the CFD simulation of the system is necessary to have a realistic prediction of a latent heat thermal storage system performance. In addition, the effects of geometrical features and quantity of fins attached to the HPs have been studied.
Assessment of water pipes durability under pressure surge
NASA Astrophysics Data System (ADS)
Pham Ha, Hai; Minh, Lanh Pham Thi; Tang Van, Lam; Bulgakov, Boris; Bazhenova, Soafia
2017-10-01
Surge phenomenon occurs on the pipeline by the closing valve or pump suddenly lost power. Due to the complexity of the water hammer simulation, previous researches have only considered water hammer on the single pipe or calculation of some positions on water pipe network, it have not been analysis for all of pipe on the water distribution systems. Simulation of water hammer due to closing valve on water distribution system and the influence level of pressure surge is evaluated at the defects on pipe. Water hammer on water supply pipe network are simulated by Water HAMMER software academic version and the capacity of defects are calculated by SINTAP. SINTAP developed from Brite-Euram projects in Brussels-Belgium with the aim to develop a process for assessing the integrity of the structure for the European industry. Based on the principle of mechanical fault, indicating the size of defects in materials affect the load capacity of the product in the course of work, the process has proposed setting up the diagram to fatigue assessment defect (FAD). The methods are applied for water pipe networks of Lien Chieu district, Da Nang city, Viet Nam, the results show the affected area of wave pressure by closing the valve and thereby assess the greatest pressure surge effect to corroded pipe. The SINTAP standard and finite element mesh analysis at the defect during the occurrence of pressure surge which will accurately assess the bearing capacity of the old pipes. This is one of the bases to predict the leakage locations on the water distribution systems. Amount of water hammer when identified on the water supply networks are decreasing due to local losses at the nodes as well as the friction with pipe wall, so this paper adequately simulate water hammer phenomena applying for actual water distribution systems. The research verified that pipe wall with defect is damaged under the pressure surge value.
Combining geomorphological mapping and near surface geophysics (GPR and ERT) to study piping systems
NASA Astrophysics Data System (ADS)
Bernatek-Jakiel, Anita; Kondracka, Marta
2016-12-01
This paper aims to provide a more comprehensive characterization of piping systems in mountainous areas under a temperate climate using geomorphological mapping and geophysical methods (electrical resistivity tomography - ERT and ground penetrating radar - GPR). The significance of piping in gully formation and hillslope hydrology has been discussed for many years, and most of the studies are based on surface investigations. However, it seems that most surface investigations underestimate this subsurface process. Therefore, our purpose was to estimate the scale of piping activity based on both surface and subsurface investigations. We used geophysical methods to detect the boundary of lateral water movement fostering pipe development and recognize the internal structure of the underlying materials. The survey was carried out in the Bereźnica Wyżna catchment, in the Bieszczady Mountains. (Eastern Carpathians, Poland), where pipes develop in Cambisols at a mean depth of about 0.7-0.8 m. The geophysical techniques that were used are shown to be successful in identifying pipes. GPR data suggest that the density of piping systems is much larger than that detectible from surface observations alone. Pipe length can be > 6.5-9.2% (maximum = 49%) higher than what surface mapping suggests. Thus, the significance of piping in hillslope hydrology and gully formation can be greater than previously assumed. These results also draw attention to the scale of piping activity in the Carpathians, where this process has been neglected for many years. The ERT profiles reveal areas affected by piping as places of higher resistivity values, which are an effect of a higher content of air-filled pores (due to higher soil porosity, intense biological activity, and well-developed soil structure). In addition, the ERT profiles show that the pipes in the study area develop at the soil-bedrock interface, probably above the layers of shales or mudstones which create a water restrictive layer. Our results illustrate the suitability and limitations of GPR and ERT to study soil piping. In general, geophysical surveying is useful for gathering more information on pipe density, potential pipe detection, and recognition of the internal structure of materials underlying the pipes. However, the interpretation of radargrams and ERT profiles should be always accompanied by detailed terrain mapping due to potential disturbances affecting geophysical profiles.
46 CFR 154.310 - Cargo piping systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Arrangements § 154.310 Cargo piping systems. Cargo liquid or vapor piping must: (a) Be separated from other...); (b) Not enter or pass through any accommodation, service, or control space; (c) Except as allowed under § 154.703, not enter or pass through a machinery space other than a cargo pump or compressor room...
46 CFR 154.310 - Cargo piping systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Arrangements § 154.310 Cargo piping systems. Cargo liquid or vapor piping must: (a) Be separated from other...); (b) Not enter or pass through any accommodation, service, or control space; (c) Except as allowed under § 154.703, not enter or pass through a machinery space other than a cargo pump or compressor room...
46 CFR 154.310 - Cargo piping systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Arrangements § 154.310 Cargo piping systems. Cargo liquid or vapor piping must: (a) Be separated from other...); (b) Not enter or pass through any accommodation, service, or control space; (c) Except as allowed under § 154.703, not enter or pass through a machinery space other than a cargo pump or compressor room...
46 CFR 154.310 - Cargo piping systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Arrangements § 154.310 Cargo piping systems. Cargo liquid or vapor piping must: (a) Be separated from other...); (b) Not enter or pass through any accommodation, service, or control space; (c) Except as allowed under § 154.703, not enter or pass through a machinery space other than a cargo pump or compressor room...
46 CFR 154.310 - Cargo piping systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Arrangements § 154.310 Cargo piping systems. Cargo liquid or vapor piping must: (a) Be separated from other...); (b) Not enter or pass through any accommodation, service, or control space; (c) Except as allowed under § 154.703, not enter or pass through a machinery space other than a cargo pump or compressor room...
Translations on USSR Resources, Number 763
1978-01-06
supplying gas pumping units, pipes, and other equipment. 33 Shatlyk . Complex Gas Preparation Unit i 1 * Medvezhe. Gas Prepara- tion Block. Thus...handled satisfactorily. . Shatlyk . Turkmengazprom. Central Control Station Combine with Head Facilities Operating Room. By means of the Impul’s-2 remote
Report #18-P-0206, May 30, 2018. Decreases in sewage overflows from Atlanta's wastewater treatment facilities and sewage transmission pipes reduce the risk of city residents being exposed to pathogens.
75 FR 17708 - Kinder Morgan Louisiana Pipeline LLC; Notice of Request Under Blanket Authorization
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... authorization to construct and operate a new tap, including ball valve and riser and approximately 15 feet of 8..., riser, 15-feet of 8-inch diameter piping and such other appurtenant facilities as deemed necessary to...
46 CFR 153.975 - Preparation for cargo transfer.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer... facility is made before the cargo transfer piping is joined. (c) Any supplemental inert gas supply...
46 CFR 153.975 - Preparation for cargo transfer.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer... facility is made before the cargo transfer piping is joined. (c) Any supplemental inert gas supply...
46 CFR 153.975 - Preparation for cargo transfer.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer... facility is made before the cargo transfer piping is joined. (c) Any supplemental inert gas supply...
46 CFR 153.975 - Preparation for cargo transfer.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer... facility is made before the cargo transfer piping is joined. (c) Any supplemental inert gas supply...
Long titanium heat pipes for high-temperature space radiators
NASA Technical Reports Server (NTRS)
Girrens, S. P.; Ernst, D. M.
1982-01-01
Titanium heat pipes are being developed to provide light weight, reliable heat rejection devices as an alternate radiator design for the Space Reactor Power System (SP-100). The radiator design includes 360 heat pipes, each of which is 5.2 m long and dissipates 3 kW of power at 775 K. The radiator heat pipes use potassium as the working fluid, have two screen arteries for fluid return, a roughened surface distributive wicking system, and a D shaped cross section container configuration. A prototype titanium heat pipe, 5.5 m long, was fabricated and tested in space simulating conditions. Results from startup and isothermal operation tests are presented. These results are also compared to theoretical performance predictions that were used to design the heat pipe initially.
Long titanium heat pipes for high-temperature space radiators
NASA Technical Reports Server (NTRS)
Girrens, S. P.; Ernst, D. M.
1982-01-01
Titanium heat pipes are being developed to provide light weight, reliable heat rejection devices as an alternate radiator design for the Space Reactor Power System (SP-100). The radiator design includes 360 heat pipes, each of which is 5.2 m long and dissipates 3 kW of power at 775 K. The radiator heat pipes use potassium as the working fluid, have two screen arteries for fluid return, a roughened surface distributive wicking system, and a D-shaped cross-section container configuration. A prototype titanium heat pipe, 5.5-m long, has been fabricated and tested in space-simulating conditions. Results from startup and isothermal operation tests are presented. These results are also compared to theoretical performance predictions that were used to design the heat pipe initially.
46 CFR 56.01-10 - Plan approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ballast piping. (vii) Tank cleaning piping. (viii) Condenser circulating water piping. (ix) Vent, sound....) (xii) Cargo piping. (xiii) Hot water heating systems if the temperature is greater than 121 °C(250 °F... substantiate their compliance with the regulations of this subchapter; (3) A thermal stress analysis is not...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Piping. 76.17-15 Section 76.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Piping. 76.17-15 Section 76.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Piping. 95.17-15 Section 95.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Piping. 95.17-15 Section 95.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...
46 CFR 154.910 - Inert gas piping: Location.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Inert gas piping: Location. 154.910 Section 154.910 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... Atmospheric Control in Cargo Containment Systems § 154.910 Inert gas piping: Location. Inert gas piping must...
Argentine gas system underway for Gas del Estado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bosch, H.
Gas del Estado's giant 1074-mile Centro-Oeste pipeline project - designed to ultimately transport over 350 million CF/day of natural gas from the Neuquen basin to the Campo Duran-Buenos Aires pipeline system - is now underway. The COGASCO consortium of Dutch and Argentine companies awarded the construction project will also operate and maintain the system for 15 years after its completion. In addition to the 30-in. pipelines, the agreement calls for a major compressor station at the gas field, three intermediate compressor stations, a gas-treatment plant, liquids-recovery facilities, and the metering, control, communications, and maintenance equipment for the system. Fabricated inmore » Holland, the internally and externally coated pipe will be double-jointed to 80-ft lengths after shipment to Argentina; welders will use conventional manual-arc techniques to weld the pipeline in the field.« less
NASA Astrophysics Data System (ADS)
Mahdavi, Mahboobe
Thermal energy storage systems as an integral part of concentrated solar power plants improve the performance of the system by mitigating the mismatch between the energy supply and the energy demand. Using a phase change material (PCM) to store energy increases the energy density, hence, reduces the size and cost of the system. However, the performance is limited by the low thermal conductivity of the PCM, which decreases the heat transfer rate between the heat source and PCM, which therefore prolongs the melting, or solidification process, and results in overheating the interface wall. To address this issue, heat pipes are embedded in the PCM to enhance the heat transfer from the receiver to the PCM, and from the PCM to the heat sink during charging and discharging processes, respectively. In the current study, the thermal-fluid phenomenon inside a heat pipe was investigated. The heat pipe network is specifically configured to be implemented in a thermal energy storage unit for a concentrated solar power system. The configuration allows for simultaneous power generation and energy storage for later use. The network is composed of a main heat pipe and an array of secondary heat pipes. The primary heat pipe has a disk-shaped evaporator and a disk-shaped condenser, which are connected via an adiabatic section. The secondary heat pipes are attached to the condenser of the primary heat pipe and they are surrounded by PCM. The other side of the condenser is connected to a heat engine and serves as its heat acceptor. The applied thermal energy to the disk-shaped evaporator changes the phase of working fluid in the wick structure from liquid to vapor. The vapor pressure drives it through the adiabatic section to the condenser where the vapor condenses and releases its heat to a heat engine. It should be noted that the condensed working fluid is returned to the evaporator by the capillary forces of the wick. The extra heat is then delivered to the phase change material through the secondary heat pipes. During the discharging process, secondary heat pipes serve as evaporators and transfer the stored energy to the heat engine. (Abstract shortened by ProQuest.).
Welding Penetration Control of Fixed Pipe in TIG Welding Using Fuzzy Inference System
NASA Astrophysics Data System (ADS)
Baskoro, Ario Sunar; Kabutomori, Masashi; Suga, Yasuo
This paper presents a study on welding penetration control of fixed pipe in Tungsten Inert Gas (TIG) welding using fuzzy inference system. The welding penetration control is essential to the production quality welds with a specified geometry. For pipe welding using constant arc current and welding speed, the bead width becomes wider as the circumferential welding of small diameter pipes progresses. Having welded pipe in fixed position, obviously, the excessive arc current yields burn through of metals; in contrary, insufficient arc current produces imperfect welding. In order to avoid these errors and to obtain the uniform weld bead over the entire circumference of the pipe, the welding conditions should be controlled as the welding proceeds. This research studies the intelligent welding process of aluminum alloy pipe 6063S-T5 in fixed position using the AC welding machine. The monitoring system used a charge-coupled device (CCD) camera to monitor backside image of molten pool. The captured image was processed to recognize the edge of molten pool by image processing algorithm. Simulation of welding control using fuzzy inference system was constructed to simulate the welding control process. The simulation result shows that fuzzy controller was suitable for controlling the welding speed and appropriate to be implemented into the welding system. A series of experiments was conducted to evaluate the performance of the fuzzy controller. The experimental results show the effectiveness of the control system that is confirmed by sound welds.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swamy, S.A.; Mandava, P.R.; Bhowmick, D.C.
The leak-before-break (LBB) methodology is accepted as a technically justifiable approach for eliminating postulation of Double-Ended Guillotine Breaks (DEGB) in high energy piping systems. This is the result of extensive research, development, and rigorous evaluations by the NRC and the commercial nuclear power industry since the early 1970s. The DEGB postulation is responsible for the many hundreds of pipe whip restraints and jet shields found in commercial nuclear plants. These restraints and jet shields not only cost many millions of dollars, but also cause plant congestion leading to reduced reliability in inservice inspection and increased man-rem exposure. While use ofmore » leak-before-break technology saved hundreds of millions of dollars in backfit costs to many operating Westinghouse plants, value-impacts resulting from the application of this technology for future plants are greater on a per plant basis. These benefits will be highlighted in this paper. The LBB technology has been applied extensively to high energy piping systems in operating plants. However, there are differences between the application of LBB technology to an operating plant and to a new plant design. In this paper an approach is proposed which is suitable for application of LBB to a new plant design such as the Westinghouse AP600. The approach is based on generating Bounding Analyses Curves (BAC) for the candidate piping systems. The general methodology and criteria used for developing the BACs are based on modified GDC-4 and Standard Review Plan (SRP) 3.6.3. The BAC allows advance evaluation of the piping system from the LBB standpoint thereby assuring LBB conformance for the piping system. The piping designer can use the results of the BACs to determine acceptability of design loads and make modifications (in terms of piping layout and support configurations) as necessary at the design stage to assure LBB for the, piping systems under consideration.« less
NASA Astrophysics Data System (ADS)
Frend, Chauncey; Boyles, Michael
2015-03-01
This paper describes an environmental feedback device (EFD) control system aimed at simplifying the VR development cycle. Programmable Immersive Peripheral Environmental System (PIPES) affords VR developers a custom approach to programming and controlling EFD behaviors while relaxing the required knowledge and expertise of electronic systems. PIPES has been implemented for the Unity engine and features EFD control using the Arduino integrated development environment. PIPES was installed and tested on two VR systems, a large format CAVE system and an Oculus Rift HMD system. A photocell based end-to-end latency experiment was conducted to measure latency within the system. This work extends previously unpublished prototypes of a similar design. Development and experiments described in this paper are part of the VR community goal to understand and apply environment effects to VEs that ultimately add to users' perceived presence.
Do piped water and flush toilets prevent child diarrhea in rural Philippines?
Capuno, Joseph J; Tan, Carlos Antonio R; Fabella, Vigile Marie
2015-03-01
Similar to other developing countries, diarrhea in the Philippines continues to be among the top causes of child mortality and morbidity. In pursuit of its Millennium Development Goals, the Philippine government commits to reduce child deaths and provide water and sanitation services to more rural households by 2015. Applying propensity score matching on the 1993, 1998, 2003, and 2008 rounds of the National Demographic and Health Survey to estimate the average treatment effect on the treated, it is found that the incidence of diarrhea among under-5 children is lower by as much as 4.5% in households with access to piped water and 10% in those with their own flush toilets, relative to comparable households. These findings underscore the need to ensure the quality of drinking water from the pipe or from other improved sources at the point of use, and the provision of improved and own sanitation facilities. © 2011 APJPH.
Centrally activated pipe snubbing system
Cawley, William E.
1985-01-01
An electromechanical pipe snubbing system and an electromechanical pipe snubber. In the system, each pipe snubber, in a set of pipe snubbers, has an electromechanical mechanism to lock and unlock the snubber. A sensor, such as a seismometer, measures a quantity related to making a snubber locking or unlocking decision. A control device makes an electrical connection between a power supply and each snubber's electromechanical mechanism to simultaneously lock each snubber when the sensor measurement indicates a snubber locking condition. The control device breaks the connection to simultaneously unlock each snubber when the sensor measurement indicates a snubber unlocking condition. In the snubber, one end of the shaft slides within a bore in one end of a housing. The other end of the shaft is rotatably attached to a pipe; the other end of the housing is rotatively attached to a wall. The snubber's electromechanical mechanism locks the slidable end of the shaft to the housing and unlocks that end from the housing. The electromechanical mechanism permits remote testing and lockup status indication for each snubber.
Stirling engine external heat system design with heat pipe heater
NASA Technical Reports Server (NTRS)
Godett, Ted M.; Ziph, Benjamin
1986-01-01
This final report presents the conceptual design of a liquid fueled external heating system (EHS) and the preliminary design of a heat pipe heater for the STM-4120 Stirling cycle engine, to meet the Air Force mobile electric power (MEP) requirement for units in the range of 20 to 60 kW. The EHS design had the following constraints: (1) Packaging requirements limited the overall system dimensions to about 330 mm x 250 mm x 100 mm; (2) Heat flux to the sodium heat pipe evaporator was limited to an average of 100 kW/m and a maximum of 550 kW/m based on previous experience; and (3) The heat pipe operating temperature was specified to be 800 C based on heat input requirements of the STM4-120. An analysis code was developed to optimize the EHS performance parameters and an analytical development of the sodium heat pipe heater was performed; both are presented and discussed. In addition, construction techniques were evaluated and scale model heat pipe testing performed.
Pressure suppression containment system for boiling water reactor
Gluntz, D.M.; Nesbitt, L.B.
1997-01-21
A system is disclosed for suppressing the pressure inside the containment of a BWR following a postulated accident. A piping subsystem is provided which features a main process pipe that communicates the wetwell airspace to a connection point downstream of the guard charcoal bed in an offgas system and upstream of the main bank of delay charcoal beds which give extensive holdup to offgases. The main process pipe is fitted with both inboard and outboard containment isolation valves. Also incorporated in the main process pipe is a low-differential-pressure rupture disk which prevents any gas outflow in this piping whatsoever until or unless rupture occurs by virtue of pressure inside this main process pipe on the wetwell airspace side of the disk exceeding the design opening (rupture) pressure differential. The charcoal holds up the radioactive species in the noncondensable gas from the wetwell plenum by adsorption, allowing time for radioactive decay before the gas is vented to the environs. 3 figs.
NASA Astrophysics Data System (ADS)
Ye, Qiang; Hu, Jing; Cheng, Ping; Ma, Zhiqi
2015-11-01
Trade-off between shunt current loss and pumping loss is a major challenge in the design of the electrolyte piping network in a flow battery system. It is generally recognized that longer and thinner ducts are beneficial to reduce shunt current but detrimental to minimize pumping power. Base on the developed analog circuit model and the flow network model, we make case studies of multi-stack vanadium flow battery piping systems and demonstrate that both shunt current and electrolyte flow resistance can be simultaneously minimized by using longer and thicker ducts in the piping network. However, extremely long and/or thick ducts lead to a bulky system and may be prohibited by the stack structure. Accordingly, the intrinsic design trade-off is between system efficiency and compactness. Since multi-stack configurations bring both flexibility and complexity to the design process, we perform systematic comparisons among representative piping system designs to illustrate the complicated trade-offs among numerous parameters including stack number, intra-stack channel resistance and inter-stack pipe resistance. As the final design depends on various technical and economical requirements, this paper aims to provide guidelines rather than solutions for designers to locate the optimal trade-off points according to their specific cases.
Sound radiation from a water-filled pipe, radiation into light fluid.
Liu, Bilong; Pan, Jie; Li, Xiaodong; Tian, Jing
2002-12-01
This paper is concerned with the sound radiation from a water-filled exhaust pipe. The pipe opening and a plate attached to it form a vibrating surface for this radiation. Fluid-structural coupling between the pipe and enclosed fluid is included in the system modeling, but light fluid assumption is used for sound radiation into the space above the vibrating surface. In this paper, a numerical study on the n = 0 mode in the pipe shows that the wave types associated with this mode have different characteristics in two regions of the nondimensional frequency omega. In the first region of 0
Lehtola, Markku J; Miettinen, Ilkka T; Keinänen, Minna M; Kekki, Tomi K; Laine, Olli; Hirvonen, Arja; Vartiainen, Terttu; Martikainen, Pertti J
2004-10-01
We studied the changes in water quality and formation of biofilms occurring in a pilot-scale water distribution system with two generally used pipe materials: copper and plastic (polyethylene, PE). The formation of biofilms with time was analysed as the number of total bacteria, heterotrophic plate counts and the concentration of ATP in biofilms. At the end of the experiment (after 308 days), microbial community structure, viable biomass and gram-negative bacterial biomass were analysed via lipid biomarkers (phospholipid fatty acids and lipopolysaccharide 3-hydroxy fatty acids), and the numbers of virus-like particles and total bacteria were enumerated by SYBR Green I staining. The formation of biofilm was slower in copper pipes than in the PE pipes, but after 200 days there was no difference in microbial numbers between the pipe materials. Copper ion led to lower microbial numbers in water during the first 200 days, but thereafter there were no differences between the two pipe materials. The number of virus-like particles was lower in biofilms and in outlet water from the copper pipes than PE pipes. Pipe material influenced also the microbial and gram-negative bacterial community structure in biofilms and water.
Radiation detector system having heat pipe based cooling
Iwanczyk, Jan S.; Saveliev, Valeri D.; Barkan, Shaul
2006-10-31
A radiation detector system having a heat pipe based cooling. The radiation detector system includes a radiation detector thermally coupled to a thermo electric cooler (TEC). The TEC cools down the radiation detector, whereby heat is generated by the TEC. A heat removal device dissipates the heat generated by the TEC to surrounding environment. A heat pipe has a first end thermally coupled to the TEC to receive the heat generated by the TEC, and a second end thermally coupled to the heat removal device. The heat pipe transfers the heat generated by the TEC from the first end to the second end to be removed by the heat removal device.
Apparatus for inspecting piping
Zollingger, W. Thor; Appel, D. Keith; Park, Larry R.
1995-01-01
An inspection rabbit for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON.RTM.). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system.
Apparatus and method for detecting leaks in piping
Trapp, Donald J.
1994-01-01
A method and device for detecting the location of leaks along a wall or piping system, preferably in double-walled piping. The apparatus comprises a sniffer probe, a rigid cord such as a length of tube attached to the probe on one end and extending out of the piping with the other end, a source of pressurized air and a source of helium. The method comprises guiding the sniffer probe into the inner pipe to its distal end, purging the inner pipe with pressurized air, filling the annulus defined between the inner and outer pipe with helium, and then detecting the presence of helium within the inner pipe with the probe as is pulled back through the inner pipe. The length of the tube at the point where a leak is detected determines the location of the leak in the pipe.
46 CFR 56.15-1 - Pipe joining fittings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subpart 50.25 of this subchapter are acceptable for use in piping systems. (b) Threaded, flanged, socket-welding, buttwelding, and socket-brazing pipe joining fittings, made in accordance with the applicable...
46 CFR 56.15-1 - Pipe joining fittings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subpart 50.25 of this subchapter are acceptable for use in piping systems. (b) Threaded, flanged, socket-welding, buttwelding, and socket-brazing pipe joining fittings, made in accordance with the applicable...
46 CFR 56.15-1 - Pipe joining fittings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subpart 50.25 of this subchapter are acceptable for use in piping systems. (b) Threaded, flanged, socket-welding, buttwelding, and socket-brazing pipe joining fittings, made in accordance with the applicable...
46 CFR 56.15-1 - Pipe joining fittings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subpart 50.25 of this subchapter are acceptable for use in piping systems. (b) Threaded, flanged, socket-welding, buttwelding, and socket-brazing pipe joining fittings, made in accordance with the applicable...
46 CFR 58.25-20 - Piping for steering gear.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-20 Piping for steering gear. (a) Pressure piping must comply with subpart 58.30 of this part. (b) Relief valves must be fitted in any part of a hydraulic system that can be isolated and in which pressure can be generated from the power units or from external...
46 CFR 58.25-20 - Piping for steering gear.
Code of Federal Regulations, 2013 CFR
2013-10-01
... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-20 Piping for steering gear. (a) Pressure piping must comply with subpart 58.30 of this part. (b) Relief valves must be fitted in any part of a hydraulic system that can be isolated and in which pressure can be generated from the power units or from external...
46 CFR 58.25-20 - Piping for steering gear.
Code of Federal Regulations, 2012 CFR
2012-10-01
... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-20 Piping for steering gear. (a) Pressure piping must comply with subpart 58.30 of this part. (b) Relief valves must be fitted in any part of a hydraulic system that can be isolated and in which pressure can be generated from the power units or from external...
46 CFR 58.25-20 - Piping for steering gear.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-20 Piping for steering gear. (a) Pressure piping must comply with subpart 58.30 of this part. (b) Relief valves must be fitted in any part of a hydraulic system that can be isolated and in which pressure can be generated from the power units or from external...
46 CFR 58.25-20 - Piping for steering gear.
Code of Federal Regulations, 2014 CFR
2014-10-01
... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-20 Piping for steering gear. (a) Pressure piping must comply with subpart 58.30 of this part. (b) Relief valves must be fitted in any part of a hydraulic system that can be isolated and in which pressure can be generated from the power units or from external...
46 CFR 76.25-10 - Size and arrangement of sprinkler heads and pipe sizes.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-10 Size and arrangement of sprinkler heads and pipe sizes. (a) General. (1) The system shall be so designed and arranged that the... 46 Shipping 3 2012-10-01 2012-10-01 false Size and arrangement of sprinkler heads and pipe sizes...
46 CFR 76.25-10 - Size and arrangement of sprinkler heads and pipe sizes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-10 Size and arrangement of sprinkler heads and pipe sizes. (a) General. (1) The system shall be so designed and arranged that the... 46 Shipping 3 2013-10-01 2013-10-01 false Size and arrangement of sprinkler heads and pipe sizes...
46 CFR 76.25-10 - Size and arrangement of sprinkler heads and pipe sizes.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-10 Size and arrangement of sprinkler heads and pipe sizes. (a) General. (1) The system shall be so designed and arranged that the... 46 Shipping 3 2014-10-01 2014-10-01 false Size and arrangement of sprinkler heads and pipe sizes...
46 CFR 76.25-10 - Size and arrangement of sprinkler heads and pipe sizes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-10 Size and arrangement of sprinkler heads and pipe sizes. (a) General. (1) The system shall be so designed and arranged that the... 46 Shipping 3 2011-10-01 2011-10-01 false Size and arrangement of sprinkler heads and pipe sizes...
46 CFR 76.25-10 - Size and arrangement of sprinkler heads and pipe sizes.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-10 Size and arrangement of sprinkler heads and pipe sizes. (a) General. (1) The system shall be so designed and arranged that the... 46 Shipping 3 2010-10-01 2010-10-01 false Size and arrangement of sprinkler heads and pipe sizes...
46 CFR 182.730 - Nonferrous metallic piping materials.
Code of Federal Regulations, 2011 CFR
2011-10-01
... protect piping systems using aluminum alloys in high risk fire areas due to the low melting point of aluminum alloys; (2) Provisions must be made to prevent or mitigate the effect of galvanic corrosion due to... compound must be used in making up threaded joints in aluminum pipe to prevent seizing. Pipe in the...
46 CFR 153.281 - Piping to independent tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Piping to independent tanks. 153.281 Section 153.281... Systems and Cargo Handling Equipment § 153.281 Piping to independent tanks. Piping for an independent cargo tank must penetrate the tank only through that part of the tank or dome extending above the...
46 CFR 153.281 - Piping to independent tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Piping to independent tanks. 153.281 Section 153.281... Systems and Cargo Handling Equipment § 153.281 Piping to independent tanks. Piping for an independent cargo tank must penetrate the tank only through that part of the tank or dome extending above the...
46 CFR 154.517 - Piping: Liquid pressure relief.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...
46 CFR 154.517 - Piping: Liquid pressure relief.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...
46 CFR 154.517 - Piping: Liquid pressure relief.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...
46 CFR 154.517 - Piping: Liquid pressure relief.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...
46 CFR 154.517 - Piping: Liquid pressure relief.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...
46 CFR 56.90-10 - Threaded piping (modifies 135.5).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Threaded piping (modifies 135.5). 56.90-10 Section 56.90-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Assembly § 56.90-10 Threaded piping (modifies 135.5). (a) Any compound or...
21. Building 202, underside of test stand A, detail of ...
21. Building 202, underside of test stand A, detail of junction of scrubber structure and test stand with water pipes and valves visible. View looking southeast. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Hazardous Air Pollutants for Steel Pickling-HCl Process Facilities and Hydrochloric Acid... to remove residual acid. Carbon steel means steel that contains approximately 2 percent or less... equipment and tanks configured for pickling metal strip, rod, wire, tube, or pipe that is passed through an...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Hazardous Air Pollutants for Steel Pickling-HCl Process Facilities and Hydrochloric Acid... to remove residual acid. Carbon steel means steel that contains approximately 2 percent or less... equipment and tanks configured for pickling metal strip, rod, wire, tube, or pipe that is passed through an...
Reynolds stress scaling in pipe flow turbulence—first results from CICLoPE
Fiorini, T.; Bellani, G.; Talamelli, A.
2017-01-01
This paper reports the first turbulence measurements performed in the Long Pipe Facility at the Center for International Cooperation in Long Pipe Experiments (CICLoPE). In particular, the Reynolds stress components obtained from a number of straight and boundary-layer-type single-wire and X-wire probes up to a friction Reynolds number of 3.8×104 are reported. In agreement with turbulent boundary-layer experiments as well as with results from the Superpipe, the present measurements show a clear logarithmic region in the streamwise variance profile, with a Townsend–Perry constant of A2≈1.26. The wall-normal variance profile exhibits a Reynolds-number-independent plateau, while the spanwise component was found to obey a logarithmic scaling over a much wider wall-normal distance than the other two components, with a slope that is nearly half of that of the Townsend–Perry constant, i.e. A2,w≈A2/2. The present results therefore provide strong support for the scaling of the Reynolds stress tensor based on the attached-eddy hypothesis. Intriguingly, the wall-normal and spanwise components exhibit higher amplitudes than in previous studies, and therefore call for follow-up studies in CICLoPE, as well as other large-scale facilities. This article is part of the themed issue ‘Toward the development of high-fidelity models of wall turbulence at large Reynolds number’. PMID:28167586
View of Stand Pipe (Surge Tank) from FS 502. Looking ...
View of Stand Pipe (Surge Tank) from FS 502. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Stand Pipe (Surge Tank), Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Flexible pipe crawling device having articulated two axis coupling
Zollinger, William T.
1994-01-01
An apparatus for moving through the linear and non-linear segments of piping systems. The apparatus comprises a front leg assembly, a rear leg assembly, a mechanism for extension and retraction of the front and rear leg assembles with respect to each other, such as an air cylinder, and a pivoting joint. One end of the flexible joint attaches to the front leg assembly and the other end to the air cylinder, which is also connected to the rear leg assembly. The air cylinder allows the front and rear leg assemblies to progress through a pipe in "inchworm" fashion, while the joint provides the flexibility necessary for the pipe crawler to negotiate non-linear piping segments. The flexible connecting joint is coupled with a spring-force suspension system that urges alignment of the front and rear leg assemblies with respect to each other. The joint and suspension system cooperate to provide a firm yet flexible connection between the front and rear leg assemblies to allow the pivoting of one with respect to the other while moving around a non-linear pipe segment, but restoring proper alignment coming out of the pipe bend.
Flexible pipe crawling device having articulated two axis coupling
Zollinger, W.T.
1994-05-10
An apparatus is described for moving through the linear and non-linear segments of piping systems. The apparatus comprises a front leg assembly, a rear leg assembly, a mechanism for extension and retraction of the front and rear leg assembles with respect to each other, such as an air cylinder, and a pivoting joint. One end of the flexible joint attaches to the front leg assembly and the other end to the air cylinder, which is also connected to the rear leg assembly. The air cylinder allows the front and rear leg assemblies to progress through a pipe in inchworm' fashion, while the joint provides the flexibility necessary for the pipe crawler to negotiate non-linear piping segments. The flexible connecting joint is coupled with a spring-force suspension system that urges alignment of the front and rear leg assemblies with respect to each other. The joint and suspension system cooperate to provide a firm yet flexible connection between the front and rear leg assemblies to allow the pivoting of one with respect to the other while moving around a non-linear pipe segment, but restoring proper alignment coming out of the pipe bend. 4 figures.
In-Service Monitoring of Steam Pipe Systems at High Temperatures
NASA Technical Reports Server (NTRS)
Bar-Cohen, Yoseph; Lih, Shyh-Shiuh; Badescu, Mircea; Bao, Xiaoqi; Sherrit, Stewart; Scott, James S.; Blosiu, Julian O.; Widholm, Scott E.
2011-01-01
An effective, in-service health monitoring system is needed to track water condensation in real time through the walls of steam pipes. The system is required to measure the height of the condensed water from outside the pipe, while operating at temperatures that are as high as 250 C. The system needs to account for the effects of water flow and cavitation. In addition, it is desired that the system does not require perforating the pipes and thereby reducing the structural integrity. Generally, steam pipes are used as part of the district heating system carrying steam from central power stations under the streets to heat, cool, or supply power to high-rise buildings and businesses. This system uses ultrasonic waves in pulse-echo and acquires reflected signal data. Via autocorrelation, it determines the water height while eliminating the effect of noise and multiple reflections from the wall of the pipe. The system performs nondestructive monitoring through the walls of steam pipes, and automatically measures the height of condensed water while operating at the high-temperature conditions of 250 C. For this purpose, the ultrasonic pulse-echo method is used where the time-of-flight of the wave reflections inside the water are measured, and it is multiplied by the wave velocity to determine the height. The pulse-echo test consists of emitting ultrasonic wave pulses from a piezoelectric transducer and receiving the reflections from the top and bottom of the condensed water. A single transducer is used as a transmitter as well as the receiver of the ultrasonic waves. To obtain high resolution, a broadband transducer is used and the frequency can be in the range of 2.25 to 10 MHz, providing sharp pulses in the time domain allowing for higher resolution in identifying the individual reflections.
Coal-fluid properties with an emphasis on dense phase. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klinzing, G.E.
1985-04-01
Many fossil fuel energy processes depend on the movement of solids by pneumatic transport. Despite the considerable amount of work reported in the literature on pneumatic transport, the design of new industrial systems for new products continues to rely to a great extent on empiricism. A pilot-scale test facility has been constructed at Pittsburgh Energy Technology Center (PETC), equipped with modern sophisticated measuring techniques (such as Pressure Transducers, Auburn Monitors and Micro Motion Mass Flow Meters) and an automatic computer-controlled data acquisition system to study the effects of particle pneumatic transport. Pittsburgh Seam and Montana Rosebud coals of varying sizemore » consist and moisture content were tested in the atmospheric and pressurized coal flow test loops (AP/CFTL and HP/CFTL) at PETC. The system parameters included conveying gas velocity, injector tank pressure, screw conveyor speed, pipe radius and pipe bends. In this report, results from the coal flow tests were presented and analyzed. Existing theories and correlations on two phase flows were reviewed. Experimental data were compared with values calculated from empirically or theoretically derived equations available in the literature and new correlations were proposed, when applicable, to give a better interpretation of the data and a better understanding of the various flow regimes involved in pneumatic transport. 55 refs., 56 figs., 6 tabs.« less
NASA Astrophysics Data System (ADS)
1982-04-01
The feasibility of a geothermal heating system at the Ojo Caliente Mineral Springs Co. was investigated. The geothermal energy will be used to preheat hot water for the laundry facilities and to heat the water for a two pipe fan coil heating system in the hotel. Present annual heating fuel costs of $11,218 for propane will be replaced by electricity to operate fans and pump at an annual cost of $2547, resulting in a net savings of $8671. Installation costs include $10,100 for a well system, $1400 for a laundry system, and $41,100 for a heating system. With the addition of a 10% design fee the total installation cost is $57,860. Ignoring escalating propane fuel prices, tax credits for energy conservation equipment, and potential funding from the State of New Mexico for a geothermal demonstration project, the simple economic payback period for this project is 6.7 years.
An automated tool joint inspection device for the drill string
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moyer, M.C.; Dale, B.A.; Kusenberger, F.N.
1983-02-01
This paper discusses the development of an automated tool joint inspection device (i.e., the Fatigue Crack Detector), which is capable of detecting defects in the threaded region of drill pipe and drill collars. On the basis of inspection tests conducted at a research test facility and at drilling rig sites, this device is capable of detecting both simulated defects (saw slots and drilled holes) and service-induced defects, such as fatigue cracks, pin stretch (plastic deformation), mashed threads, and corrosion pitting. The system employs an electromagnetic flux-leakage principle and has several advantages over the conventional method of magnetic particle inspection.
Credit WCT. Photographic copy of photograph, interior view of Dd ...
Credit WCT. Photographic copy of photograph, interior view of Dd test cell with VO (Viking Orbiter)-75 spacecraft engine mounted for testing. (Viking was a Mars orbiter and lander mission.) The end of the engine nozzle is inserted into a diffuser in order to conduct exhaust gases out of the chamber. All piping and tubing is stainless steel. Note ports in background through which instrumentation wiring passes. Nozzles at top of view are part of an internal fire suppression (or "Firex") system. (JPL negative no. 384-9428, 24 April 1972) - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA
Pseudomonas folliculitis in Arabian baths.
Molina-Leyva, Alejandro; Ruiz-Ruigomez, Maria
2013-07-14
A 35-year-old man presented with a painful cutaneous skin eruption that was localized on the upper trunk. He stated that the previous weekend he had attended an Arabian bath. The physical examination revealed multiple hair follicle-centered papulopustules surrounded by an erythematous halo. A clinical diagnosis of pseudomonas folliculitis was made and treatment was prescribed. Afterwards Pseudomonas aeruginosa was isolated from a pustule culture. Pseudomonas folliculitis is a bacterial infection of the hair follicles. The most common reservoirs include facilities with hot water and complex piping systems that are difficult to clean, such as hot tubs and bathtubs. Despite adequate or high chlorine levels, Pseudomonas aeruginosa can grow within a biofilm.