15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heubach, J.G.; Weimer, W.C.; Bruce, W.A.
Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less
Strategic facility planning improves capital decision making.
Reeve, J R
2001-03-01
A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
ERIC Educational Resources Information Center
Erickson, Paul W.
2009-01-01
Long-range facility planning is a comprehensive process for preparing education institutions for the future and confirm that facilities meet current needs. A long-range facilities plan (LRFP) evaluates how facilities support programs and the educational needs of students, staff and the community. Each school district or college has unique needs…
Charter School Facilities: A Resource Guide on Development and Financing.
ERIC Educational Resources Information Center
Jakubowski, Lara
This manual provides information to help charter schools navigate the facility development process, including worksheets that can be customized to suit a particular school's needs. Sections cover how facility planning fits into business planning for charter schools, review a process for assessing a school's facility needs, and summarize how to…
NASA Technical Reports Server (NTRS)
Waid, Michael
2011-01-01
Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
ERIC Educational Resources Information Center
Leu, Donald J.
The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…
Location for the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400- acre commerce park.
FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
NASA Technical Reports Server (NTRS)
Scully, Robert C.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Facility Master Plans: An Essential First Step in the Building Development Process.
ERIC Educational Resources Information Center
Wickerham, Wendell E.
2002-01-01
Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)
40 CFR 52.279 - Food processing facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...
40 CFR 52.279 - Food processing facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...
40 CFR 52.279 - Food processing facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities... emissions from food processing facilities without any accompanying analyses demonstrating that these...
40 CFR 52.279 - Food processing facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emissions from food processing facilities without any accompanying analyses demonstrating that these... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Food processing facilities. 52.279... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.279 Food processing facilities...
Antenna Test Facility (ATF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
Lin, Greg
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Radiant Heat Test Facility (RHTF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
DelPapa, Steven
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide
NASA Technical Reports Server (NTRS)
Schlesinger, Adam
2012-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Systems Engineering Simulator (SES) Simulator Planning Guide
NASA Technical Reports Server (NTRS)
McFarlane, Michael
2011-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Computational Electromagnetics (CEM) Laboratory: Simulation Planning Guide
NASA Technical Reports Server (NTRS)
Khayat, Michael A.
2011-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the CEM Laboratory. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Facility Planning for Physical Education, Recreation, and Athletics.
ERIC Educational Resources Information Center
Flynn, Richard B., Ed.
This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…
Planning the Library Media Center Facility for the 1990s and Beyond.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
This manual presents recommendations for incorporating present and future technological changes into workable, efficient, pleasant school library media facilities in two major sections: Planning the Facility and Activity Areas. The first section addresses the planning process (appointing the building committee, evaluating the library media…
Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…
FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…
FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2011
2011-01-01
The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…
FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
40 CFR 80.1449 - What are the Production Outlook Report requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... planned or underway, information on all the following, as available: (i) Strategic planning. (ii) Planning... and production processes to be used at each production facility. (iv) Changes to the facility that...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Vibration and Acoustic Test Facility (VATF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
Fantasia, Peter M.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide
NASA Technical Reports Server (NTRS)
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Artist rendition of the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square- foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
2000-05-02
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
2000-05-02
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
Chamber B Thermal/Vacuum Chamber: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Montz, Mike E.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Audio Development Laboratory (ADL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Romero, Andy
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Electronic Systems Test Laboratory (ESTL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Robinson, Neil
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Advanced Materials Laboratory User Test Planning Guide
NASA Technical Reports Server (NTRS)
Orndoff, Evelyne
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Structures Test Laboratory (STL). User Test Planning Guide
NASA Technical Reports Server (NTRS)
Zipay, John J.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Planning and Designing Facilities. Facility Design and Development--Part 1
ERIC Educational Resources Information Center
Hypes, Michael G.
2006-01-01
Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…
Development of experimental facilities for processing metallic crystals in orbit
NASA Technical Reports Server (NTRS)
Duncan, Bill J.
1990-01-01
This paper discusses the evolution, current status, and planning for facilities to exploit the microgravity environment of earth orbit in applied metallic materials science. Space-Shuttle based facilities and some precursor flight programs are reviewed. Current facility development programs and planned Space Station furnace capabilities are described. The reduced gravity levels available in earth orbit allow the processing of metallic materials without the disturbing influence of gravitationally induced thermal convection, stratification due to density differences in sample components, or the effects of hydrostatic pressure.
2002-05-02
This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400-acre Commerce Park.
ERIC Educational Resources Information Center
Buskirk, E. Drannon, Jr.; Cole, Charles A.
Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…
ERIC Educational Resources Information Center
Lowenkron, Ruth; Ponessa, Joan
2005-01-01
The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…
ERIC Educational Resources Information Center
Patchner, Michael A.; Balgopal, Pallassana R.
Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…
2011-01-01
Background Public and private family planning providers face different incentive structures, which may affect overall quality and ultimately the acceptability of family planning for their intended clients. This analysis seeks to quantify differences in the quality of family planning (FP) services at public and private providers in three representative sub-Saharan African countries (Tanzania, Kenya and Ghana), to assess how these quality differentials impact upon FP clients' satisfaction, and to suggest how quality improvements can improve contraceptive continuation rates. Methods Indices of technical, structural and process measures of quality are constructed from Service Provision Assessments (SPAs) conducted in Tanzania (2006), Kenya (2004) and Ghana (2002) using direct observation of facility attributes and client-provider interactions. Marginal effects from multivariate regressions controlling for client characteristics and the multi-stage cluster sample design assess the relative importance of different measures of structural and process quality at public and private facilities on client satisfaction. Results Private health facilities appear to be of higher (interpersonal) process quality than public facilities but not necessarily higher technical quality in the three countries, though these differentials are considerably larger at lower level facilities (clinics, health centers, dispensaries) than at hospitals. Family planning client satisfaction, however, appears considerably higher at private facilities - both hospitals and clinics - most likely attributable to both process and structural factors such as shorter waiting times and fewer stockouts of methods and supplies. Conclusions Because the public sector represents the major source of family planning services in developing countries, governments and Ministries of Health should continue to implement and to encourage incentives, perhaps performance-based, to improve quality at public sector health facilities, as well as to strengthen regulatory and monitoring structures to ensure quality at both public and private facilities. In the meantime, private providers appear to be fulfilling an important gap in the provision of FP services in these countries. PMID:21864335
Hutchinson, Paul L; Do, Mai; Agha, Sohail
2011-08-24
Public and private family planning providers face different incentive structures, which may affect overall quality and ultimately the acceptability of family planning for their intended clients. This analysis seeks to quantify differences in the quality of family planning (FP) services at public and private providers in three representative sub-Saharan African countries (Tanzania, Kenya and Ghana), to assess how these quality differentials impact upon FP clients' satisfaction, and to suggest how quality improvements can improve contraceptive continuation rates. Indices of technical, structural and process measures of quality are constructed from Service Provision Assessments (SPAs) conducted in Tanzania (2006), Kenya (2004) and Ghana (2002) using direct observation of facility attributes and client-provider interactions. Marginal effects from multivariate regressions controlling for client characteristics and the multi-stage cluster sample design assess the relative importance of different measures of structural and process quality at public and private facilities on client satisfaction. Private health facilities appear to be of higher (interpersonal) process quality than public facilities but not necessarily higher technical quality in the three countries, though these differentials are considerably larger at lower level facilities (clinics, health centers, dispensaries) than at hospitals. Family planning client satisfaction, however, appears considerably higher at private facilities - both hospitals and clinics - most likely attributable to both process and structural factors such as shorter waiting times and fewer stockouts of methods and supplies. Because the public sector represents the major source of family planning services in developing countries, governments and Ministries of Health should continue to implement and to encourage incentives, perhaps performance-based, to improve quality at public sector health facilities, as well as to strengthen regulatory and monitoring structures to ensure quality at both public and private facilities. In the meantime, private providers appear to be fulfilling an important gap in the provision of FP services in these countries.
Guidance for Preparing a Facility Plan. Revised Edition.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)
Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Schaschl, Leslie
2011-01-01
The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.
Specialized Environmental Chamber Test Complex: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Montz, Michael E.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
Facilities Guidelines for Fine Arts Programs.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
This manual of facility guidelines examines the planning process and design features and considerations for public school fine arts programs in Maryland. Planning concepts and trends are highlighted followed by planning guidelines for dance, music, theater, visual arts, general education, and performance spaces. General design considerations…
School Facilities Planning. Research Report Number 1974-2.
ERIC Educational Resources Information Center
National School Boards Association, Washington, DC.
Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…
Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael J.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
NASA Technical Reports Server (NTRS)
Vairo, Daniel M.
1998-01-01
The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.
ERIC Educational Resources Information Center
Miller, William F.
1978-01-01
Four principal processes are described: academic planning and budgeting; facility planning and capital budgeting; fund-raising priorities; and academic appointments. Trustees are mainly concerned with the first two. Academic planning and budgeting is a year-round process, with a succession of stages that facilitates effective board participation.…
Private sector's role in public school facility planning.
DOT National Transportation Integrated Search
2009-03-01
This report explores the role of private consultants in the school facility planning process. : It focuses on such issues as school siting and local government and school district collaboration. : As such, it seeks to demonstrate the importance of th...
North Carolina Public Schools Facility Standards. A Guide for Planning School Facilities.
ERIC Educational Resources Information Center
Knott, Gerald H.; Lora, James M.; Acker, Marjorie L.; Taynton, Steven; Logan, Gladys B.; Harrell, Ronald C.
The State of North Carolina has developed a planning guide for those in the process of building, enlarging, or renovating school facilities. This guide defines and describes the educational spaces needed to support a modern, comprehensive educational program and sets minimal standards for the types and sizes of spaces required. It serves as a…
2000-05-02
The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
Agha, Sohail; Do, Mai
2009-04-01
To compare the quality of family planning services delivered at public and private facilities in Kenya. Data from the 2004 Kenya Service Provision Assessment were analysed. The Kenya Service Provision Assessment is a representative sample of health facilities in the public and private sectors, and comprises data obtained from a facility inventory, service provider interviews, observations of client-provider interactions and exit interviews. Quality-of-care indicators are compared between the public and private sectors along three dimensions: structure, process and outcome. Private facilities were superior to public sector facilities in terms of physical infrastructure and the availability of services. Public sector facilities were more likely to have management systems in place. There was no difference between public and private providers in the technical quality of care provided. Private providers were better at managing interpersonal aspects of care. The higher level of client satisfaction at private facilities could not be explained by differences between public and private facilities in structural and process aspects of care. Formal private sector facilities providing family planning services exhibit greater readiness to provide services and greater attention to client needs than public sector facilities in Kenya. Consistent with this, client satisfaction is much higher at private facilities. Technical quality of care provided is similar in public and private facilities.
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
Reducing Operating Costs by Optimizing Space in Facilities
2012-03-01
Base level 5 engineering units will provide facility floor plans, furniture layouts, and staffing documentation as necessary. One obstacle...due to the quantity and diverse locations. Base level engineering units provided facility floor plans, furniture layouts, and staffing documentation... furniture purchases and placement 5. Follow a quality systematic process in all decisions The per person costs can be better understood with a real
Handbook for Educational Buildings Planning. Educational Building and Equipment 9.
ERIC Educational Resources Information Center
Almeida, Rodolfo
Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…
Automated process planning system
NASA Technical Reports Server (NTRS)
Mann, W.
1978-01-01
Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
...) Exclude facilities that produce ethanol through a natural fermentation process from the definition of... 24060) which exclude facilities that produce ethanol through a natural fermentation process from the...
Doherty, J; Rispel, L; Webb, N
1996-12-01
This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.
O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis
2011-03-01
Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... exclude facilities that produce ethanol through a natural fermentation process from the definition of... action on Kentucky's provisions to exclude facilities that produce ethanol through a natural fermentation... facilities that produce ethanol through a natural fermentation process from the definition of ``chemical...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less
Data Management Facility Operations Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, Nicole N
2014-06-30
The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.
GEOTAIL Spacecraft historical data report
NASA Technical Reports Server (NTRS)
Boersig, George R.; Kruse, Lawrence F.
1993-01-01
The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).
Yap, Glenn A; Platonova, Elena A; Musa, Philip F
2006-02-01
An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifford, M.J.; Wickstrom, G.V.
1983-10-01
Preferred treatment of high occupancy vehicles (HOV's), through strategies such as dedicated lanes, can achieve transportation energy conservation. The research presented in this report provides a method for regional planning agencies to assess such HOV facilities, from a travel demand and energy consumption standpoint. The planning process is described and applied in a case study. Products of the case study included estimates of carpool formation and associated fuel savings, and traffic operations on HOV and other facilities in the corridor. The completed process represents a method to examine HOV's under a variety of policy and operational conditions. The process ismore » within the modeling capabilities of other Metropolitan Planning Organizations (MPO's) and should be transferable to other cities and corridors. Additional applications of the HOV estimation and evaluation process are recommended.« less
NASA Technical Reports Server (NTRS)
Micol, John R.
2001-01-01
Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (CoF) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design Of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.
NASA Technical Reports Server (NTRS)
Micol, John R.
2001-01-01
Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (Car) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.
A Bridge over Troubled Water: Facility Needs for Inclusive Classrooms.
ERIC Educational Resources Information Center
Pierce, Judy; And Others
1993-01-01
Focuses on ways to meet the facility needs of students with disabilities in inclusive classrooms. Provides a definition of inclusion; discusses some processes to design school environments that support a side range of student needs; and presents a process that will enable facility planning teams to move all students from self-contained classrooms…
FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING REMOTE ...
FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL LABORATORY, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-008-105065. ALTERNATE ID NUMBER 4272-14-102. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Planning for Change: Flexible Design Solutions
ERIC Educational Resources Information Center
Mason, Craig
2010-01-01
The intersection of technology and the 21st Century learner has challenged many school districts to rethink their approach to the design of school facilities and the definition of "classroom." To strategically plan for the future, districts must not only consider facilities and curriculum, but understand a process of change that is…
Team processes in airway facilities operations control centers.
DOT National Transportation Integrated Search
2000-07-01
In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...
Department of Energy Technology Readiness Assessments - Process Guide and Training Plan
2008-09-12
Hanford Waste Treatment and Immobilization Plant ( WTP ) Analytical Laboratory, Low Activity Waste (LAW) Facility and Balance of Facilities (3 TRAs... WTP High-Level Waste (HLW) Facility – WTP Pre-Treatment (PT) Facility – Hanford River Protection Project Low Activity Waste Treatment Alternatives
New Trends in Facility Asset Management.
ERIC Educational Resources Information Center
Adams, Matt
2000-01-01
Explains new, positive trends in facility asset management that encompasses greater acceptance and involvement of facility managers in the financial planning process, greater awareness of the need for maintenance, and facility administrators taking a greater role with business officers. The new climate for alternative renewal financing proposals…
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
Keys to Success: School Facilities Primer, Questions & Answers 101.
ERIC Educational Resources Information Center
Brady, Jim
This publication provides answers to basic questions to help school board members more fully address the complexities of the planning, design, and construction process in order to maximize the goal of student success. The 101 questions and answers are in the areas of: facility planning; learning environment; information technology; safe schools;…
SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) WARM LABORATORY ...
SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) WARM LABORATORY ROOM, DECONTAMINATION ROOM, HOT CHEMISTRY LABORATORY, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-098-105066. ALTERNATE ID NUMBER 4272-14-103. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Management self assessment plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debban, B.L.
Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less
A terrorism response plan for hospital security and safety officers.
White, Donald E
2002-01-01
Security and Safety managers in today's healthcare facilities need to factor terrorism response into their emergency management plans, separate from the customary disaster plans and the comparatively recent security plans. Terrorism incidents will likely be security occurrences that use a weapon of mass destruction to magnify the incidents into disasters. Facility Y2K Plans can provide an excellent framework for the detailed contingency planning needed for terrorism response by healthcare facilities. Tabbed binder notebooks, with bulleted procedures and contact points for each functional section, can provide security and safety officers with at-a-glance instructions for quick 24/7 implementation. Each functional section should focus upon what activities or severity levels trigger activation of the backup processes. Network with your countywide, regional, and/or state organizations to learn what your peers are doing. Comprehensively inventory your state, local, and commercial resources so that you have alternate providers readily available 24/7 to assist your facility upon disasters.
The Architectural and Interior Design Planning Process.
ERIC Educational Resources Information Center
Cohen, Elaine
1994-01-01
Explains the planning process in designing effective library facilities and discusses library building requirements that result from electronic information technologies. Highlights include historical structures; Americans with Disabilities Act; resource allocation; electrical power; interior spaces; lighting; design development; the roles of…
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
Integrated Facilities and Infrastructure Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reisz Westlund, Jennifer Jill
Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less
Planning Tool for Strategic Evaluation of Facility Plans - 13570
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, Virginia; Cercy, Michael; Hall, Irin
2013-07-01
Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keane, C. J.
2014-01-28
The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is operated as a National Nuclear Security Administration (NNSA) user facility in accordance with Department of Energy (DOE) best practices, including peer-reviewed experiments, regular external reviews of performance, and the use of a management structure that facilitates user and stakeholder feedback. NIF facility time is managed using processes similar to those in other DOE science facilities and is tailored to meet the mix of missions and customers that NIF supports. The NIF Governance Plan describes the process for allocating facility time on NIF and for creating the shot schedule.more » It also includes the flow of responsibility from entity to entity. The plan works to ensure that NIF meets its mission goals using the principles of scientific peer review, including transparency and cooperation among the sponsor, the NIF staff, and the various user communities. The NIF Governance Plan, dated September 28, 2012, was accepted and signed by LLNL Director Parney Albright, NIF Director Ed Moses, and Don Cook and Thomas D’Agostino of NNSA. Figure 1 shows the organizational structure for NIF Governance.« less
Living in interesting times: applying creative strategic planning.
Jessome, P
1995-01-01
Rapidly changing expectations and environments have put health care facilities under increasing pressure. Using traditional strategic planning to deal with these challenges has often produced disappointing results. This article outlines a different approach, based on Robert Fritz's model of the creative process, and discusses its application in Kiwanis Lodge in West Vancouver, an intermediate care facility.
40 CFR 372.20 - Process for modifying covered chemicals and facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... chemicals and facilities. 372.20 Section 372.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS TOXIC CHEMICAL RELEASE REPORTING: COMMUNITY RIGHT-TO-KNOW Reporting Requirements § 372.20 Process for modifying covered chemicals...
Room To Grow? Facilities Programming for Colleges and Universities.
ERIC Educational Resources Information Center
Thompson, Roger; Adams, Tom
2001-01-01
Asserts that campus space needs could be remedied by moving centrally located service delivery organizations, such as fleet vehicle maintenance facilities. Describes the process of operational and space needs assessment; this process provides information that enables architects to plan for appropriate adjacencies, correct space allocation, and…
Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026
DOE Office of Scientific and Technical Information (OSTI.GOV)
Starkey, J.G.
1993-05-01
The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated October 8, 1991: 'Plant researchers Neil Yorio and Lisa Ruffe prepare to harvest a crop of Waldann's Green Lettuce from KSC's Biomass Production Chamber (BPC). KSC researchers have grown several different crops in the BPC to determine which plants will better produce food, water and oxygen on long-duration space missions.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated October 8, 1991: 'Plant researchers Lisa Ruffe and Neil Yorio prepare to harvest a crop of Waldann's Green Lettuce from KSC's Biomass Production Chamber (BPC). KSC researchers have grown several different crops in the BPC to determine which plants will better produce food, water and oxygen on long-duration space missions.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Reducing shingle waste at a manufacturing facility: 1990 MNTAP summer intern report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Menke, D.
1990-12-31
CertainTeed manufactures roofing shingles at it`s Shakopee, MN facility. Two process coating lines, and one assembly line, produce fifteen shingle types in fifteen different colors. The wastes generated by this process were the result of planned and unplanned variations in the continuous production process. Planned variations included changes in color, while felt breaks were common unplanned variations. Five options were identified that could reduce the amount of waste generated: Using a standard procedure for recovering from felt breaks, Creating a process cushion to maintain continuous production in the event of temporary shutdowns, An automated color change process, Manufacture of amore » new product from waste material, Minor process changes to reduce the frequency of breaks.« less
Lee, Robert H; Bott, Marjorie J; Gajewski, Byron; Taunton, Roma Lee
2009-02-01
To examine the efficiency of the care planning process in nursing homes. We collected detailed primary data about the care planning process for a stratified random sample of 107 nursing homes from Kansas and Missouri. We used these data to calculate the average direct cost per care plan and used data on selected deficiencies from the Online Survey Certification and Reporting System to measure the quality of care planning. We then analyzed the efficiency of the assessment process using corrected ordinary least squares (COLS) and data envelopment analysis (DEA). Both approaches suggested that there was considerable inefficiency in the care planning process. The average COLS score was 0.43; the average DEA score was 0.48. The correlation between the two sets of scores was quite high, and there was no indication that lower costs resulted in lower quality. For-profit facilities were significantly more efficient than not-for-profit facilities. Multiple studies of nursing homes have found evidence of inefficiency, but virtually all have had measurement problems that raise questions about the results. This analysis, which focuses on a process with much simpler measurement issues, finds evidence of inefficiency that is largely consistent with earlier studies. Making nursing homes more efficient merits closer attention as a strategy for improving care. Increasing efficiency by adopting well-designed, reliable processes can simultaneously reduce costs and improve quality.
ITS Early Deployment Study, Richmond/ Tri-Cities Area, User Service Plan
DOT National Transportation Integrated Search
1996-05-01
">THE ESSENCE OF THE ITS PLANNING PROCESS IS TO DEVELOP EACH ITS PROGRAM ON THE BASIS OF THE NEEDS OF THE USERS AND OPERATORS OF THE TRANSPORTATION FACILITIES. ALTHOUGH THE PROCESS IS THE SAME NATIONWIDE, THE RESULTS ARE CUSTOMIZED IN EACH COMMUNITY ...
NASA Technical Reports Server (NTRS)
Tavana, Madjid
2005-01-01
"To understand and protect our home planet, to explore the universe and search for life, and to inspire the next generation of explorers" is NASA's mission. The Systems Management Office at Johnson Space Center (JSC) is searching for methods to effectively manage the Center's resources to meet NASA's mission. D-Side is a group multi-criteria decision support system (GMDSS) developed to support facility decisions at JSC. D-Side uses a series of sequential and structured processes to plot facilities in a three-dimensional (3-D) graph on the basis of each facility alignment with NASA's mission and goals, the extent to which other facilities are dependent on the facility, and the dollar value of capital investments that have been postponed at the facility relative to the facility replacement value. A similarity factor rank orders facilities based on their Euclidean distance from Ideal and Nadir points. These similarity factors are then used to allocate capital improvement resources across facilities. We also present a parallel model that can be used to support decisions concerning allocation of human resources investments across workforce units. Finally, we present results from a pilot study where 12 experienced facility managers from NASA used D-Side and the organization's current approach to rank order and allocate funds for capital improvement across 20 facilities. Users evaluated D-Side favorably in terms of ease of use, the quality of the decision-making process, decision quality, and overall value-added. Their evaluations of D-Side were significantly more favorable than their evaluations of the current approach. Keywords: NASA, Multi-Criteria Decision Making, Decision Support System, AHP, Euclidean Distance, 3-D Modeling, Facility Planning, Workforce Planning.
The Benefits of Guided Facility Self-Assessments
ERIC Educational Resources Information Center
O'Leary, Keith
2012-01-01
A growing number of educational institutions have discovered that a guided self-assessment solution helps them to consistently and cost-effectively obtain facility condition information and make better-informed capital planning decisions. Facility self-assessment employs a consistent, repeatable process for internal staff to quickly assess assets…
Institutional Long Range Planning.
ERIC Educational Resources Information Center
Caldwell Community Coll. and Technical Inst., Lenoir, NC.
Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
The Use of Multi-Criteria Evaluation and Network Analysis in the Area Development Planning Process
2013-03-01
layouts. The alternative layout scoring process, base in multi-criteria evaluation, returns a quantitative score for each alternative layout and a...The purpose of this research was to develop improvements to the area development planning process. These plans are used to improve operations within...an installation sub-section by altering the physical layout of facilities. One methodology was developed based on apply network analysis concepts to
ERIC Educational Resources Information Center
Department of Commerce, Washington, DC.
This volume, the second of two, presents and analyzes the information technology acquisition plans of the Federal Government by agency and component. A brief description covers the outlays planned for major information technology acquisitions of general purpose data processing and telecommunications systems, facilities, and related services for 6…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated June 22, 1988: 'A dwarf wheat variety known as Yecoro Rojo flourishes in KSC's Biomass Production Chamber. Researchers are gathering information on the crop's ability to produce food, water and oxygen, and then remove carbon dioxide. The confined quarters associated with space travel require researchers to focus on smaller plants that yield proportionately large amounts of biomass. This wheat crop takes about 85 days to grow before harvest.' Plant experiments such as this are the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Tribal Child Care Facilities: A Guide to Construction and Renovation.
ERIC Educational Resources Information Center
National Child Care Information Center, Vienna, VA.
This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…
Trocchio, J; Eckels, T
1989-06-01
The Catholic Health Association's social accountability budget is a set of tools to help Catholic healthcare facilities plan for, administer, and report benefits provided to their communities, especially the poor. It defines a full roster of community benefits that a healthcare organization may provide. The benefits fall into three major categories: activities and services, policies and procedures, and community leadership. The social accountability budget also presents guidelines for assessing the facility's existing services, activities, policies, and procedures and discusses how the facility can conduct or be part of a community needs assessment. Information collected through this assessment is used in the planning and budgeting processes. This ensures that uncompensated care and charitable services receive consideration along with traditional planning and budgeting items. Additional guidelines show the facility how to track and measure its services to the community. The final step, often absent from Catholic healthcare facilities' programs, is reporting community benefits.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-04
..., simulation labs, and a fitness center; and support facilities such as administrative offices, dormitories, a dining hall, and emergency response facilities. During the initial planning process, GSA conducted a comprehensive site evaluation process that identified and evaluated 41 candidate sites in the vicinity of the...
NIST: Information Management in the AMRF
NASA Technical Reports Server (NTRS)
Callaghan, George (Editor)
1991-01-01
The information management strategies developed for the NIST Automated Manufacturing Research Facility (AMRF) - a prototype small batch manufacturing facility used for integration and measurement related standards research are outlined in this video. The five major manufacturing functions - design, process planning, off-line programming, shop floor control, and materials processing are explained and their applications demonstrated.
Data reduction complex analog-to-digital data processing requirements for onsite test facilities
NASA Technical Reports Server (NTRS)
Debbrecht, J. D.
1976-01-01
The analog to digital processing requirements of onsite test facilities are described. The source and medium of all input data to the Data Reduction Complex (DRC) and the destination and medium of all output products of the analog-to-digital processing are identified. Additionally, preliminary input and output data formats are presented along with the planned use of the output products.
Coeur d'Alene Tribal Production Facility, Volume I of III, 2002-2003 Progress Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anders, Paul
2003-01-01
In fulfillment of the NWPPC's 3-Step Process for the implementation of new hatcheries in the Columbia Basin, this Step 1 submission package to the Council includes four items: (1) Cover letter from the Coeur d'Alene Tribe, Interdisciplinary Team Chair, and the USFWS; (2) References to key information (Attachments 1-4); (3) The updated Master Plan for the Tribe's native cutthroat restoration project; and (4) Appendices. In support of the Master Plan submitted by the Coeur d'Alene Tribe the reference chart (Item 2) was developed to allow reviewers to quickly access information necessary for accurate peer review. The Northwest Power Planning Councilmore » identified pertinent issues to be addressed in the master planning process for new artificial production facilities. References to this key information are provided in three attachments: (1) NWPPC Program language regarding the Master Planning Process, (2) Questions Identified in the September 1997 Council Policy, and (3) Program language identified by the Council's Independent Scientific Review Panel (ISRP). To meet the need for off-site mitigation for fish losses on the mainstem Columbia River, in a manner consistent with the objectives of the Council's Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operation, and maintenance of a trout production facility located adjacent to Coeur d'Alene Lake on the Coeur d'Alene Indian Reservation. The updated Master Plan (Item 3) represents the needs associated with the re-evaluation of the Coeur d'Alene Tribe's Trout Production Facility (No.199004402). This plan addresses issues and concerns expressed by the NWPPC as part of the issue summary for the Mountain Columbia provincial review, and the 3-step hatchery review process. Finally, item 4 (Appendices) documents the 3-Step process correspondence to date between the Coeur d'Alene Tribe and additional relevant entities. Item 4 provides a chronological account of previous ISRP reviews, official Coeur d'Alene fisheries program responses to a series of ISRP reviews, master planning documentation, and annual reports dating back to 1990. Collectively, the materials provided by the Coeur d'Alene Tribe in this Step-1 submission package comprehensively assesses key research, habitat improvement activities, and hatchery production issues to best protect and enhance native cutthroat trout populations and the historically and culturally important tribal fisheries they support.« less
Ade-Oshifogun, Jochebed Bosede; Dufelmeier, Thaddeus
2012-01-01
This article describes a quality improvement process for "do not return" (DNR) notices for healthcare supplemental staffing agencies and healthcare facilities that use them. It is imperative that supplemental staffing agencies partner with healthcare facilities in assuring the quality of supplemental staff. Although supplemental staffing agencies attempt to ensure quality staffing, supplemental staff are sometimes subjectively evaluated by healthcare facilities as "DNR." The objective of this article is to describe a quality improvement process to prevent and manage "DNR" within healthcare organizations. We developed a curriculum and accompanying evaluation tool by adapting Rampersad's problem-solving discipline approach: (a) definition of area(s) for improvement; (b) identification of all possible causes; (c) development of an action plan; (d) implementation of the action plan; (e) evaluation for program improvement; and (f) standardization of the process. Face and content validity of the evaluation tool was ascertained by input from a panel of experienced supplemental staff and nursing faculty. This curriculum and its evaluation tool will have practical implications for supplemental staffing agencies and healthcare facilities in reducing "DNR" rates and in meeting certification/accreditation requirements. Further work is needed to translate this process into future research. © 2012 Wiley Periodicals, Inc.
Optimizing Endoscope Reprocessing Resources Via Process Flow Queuing Analysis.
Seelen, Mark T; Friend, Tynan H; Levine, Wilton C
2018-05-04
The Massachusetts General Hospital (MGH) is merging its older endoscope processing facilities into a single new facility that will enable high-level disinfection of endoscopes for both the ORs and Endoscopy Suite, leveraging economies of scale for improved patient care and optimal use of resources. Finalized resource planning was necessary for the merging of facilities to optimize staffing and make final equipment selections to support the nearly 33,000 annual endoscopy cases. To accomplish this, we employed operations management methodologies, analyzing the physical process flow of scopes throughout the existing Endoscopy Suite and ORs and mapping the future state capacity of the new reprocessing facility. Further, our analysis required the incorporation of historical case and reprocessing volumes in a multi-server queuing model to identify any potential wait times as a result of the new reprocessing cycle. We also performed sensitivity analysis to understand the impact of future case volume growth. We found that our future-state reprocessing facility, given planned capital expenditures for automated endoscope reprocessors (AERs) and pre-processing sinks, could easily accommodate current scope volume well within the necessary pre-cleaning-to-sink reprocessing time limit recommended by manufacturers. Further, in its current planned state, our model suggested that the future endoscope reprocessing suite at MGH could support an increase in volume of at least 90% over the next several years. Our work suggests that with simple mathematical analysis of historic case data, significant changes to a complex perioperative environment can be made with ease while keeping patient safety as the top priority.
Empowering Facilities Teams through Technology
ERIC Educational Resources Information Center
Cormier, Scott
2013-01-01
Facilities departments at colleges and universities are facing the same challenge: how not to do just the most projects, but also the right projects with the limited funds they are given. In order to make the best decisions, they need more control over the capital planning process, which requires accurate, current facility condition data. Each…
1998-09-28
The orbiter Atlantis, being towed from the Shuttle Landing Facility toward the Vehicle Assembly Building (VAB) , intersects the morning sun's rays. In the background, to the right of the VAB, are the Orbiter Processing Facility 1 and 2. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations at KSC in Orbiter Processing Facility 2 for its planned flight in June 1999
Instructional Television Facilities: A Planning Guide.
ERIC Educational Resources Information Center
Witherspoon, John P.; Kessler, William J.
When planning an instructional television (ITV) system, it is suggested that educational objectives should outweigh technological considerations and that expert advice be secured before the planning process is far advanced. In line with the latter suggestion, the book offers a background of technical knowledge aimed at educational administrators…
Educational Master Planning: Creative or Cathartic?
ERIC Educational Resources Information Center
Rossmeier, Joseph G.
Recently, Northern Virginia Community College has moved into a new era of institutional development, whereby primary attention to facility planning and increasing enrollments has given way to a comprehensive, program-based, and strategic planning process which transcends all elements of the institution. Recognition is given to the integral…
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
... per year within the Bristol Area is Exide Technologies Facility, a lead acid battery manufacturing and recycling facility which processes lead and reclaimed lead into batteries for the auto industry. Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
... produce ethanol through a natural fermentation process from the definition of ``chemical process plants... facilities that produce ethanol through a natural fermentation process from the definition of ``chemical...
KSC ground operations planning for Space Station
NASA Technical Reports Server (NTRS)
Lyon, J. R.; Revesz, W., Jr.
1993-01-01
At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.
Keyes, Emily B; Haile-Mariam, Abonesh; Belayneh, Neghist T; Gobezie, Wasihun A; Pearson, Luwei; Abdullah, Muna; Kebede, Henok
2011-10-01
To describe the methods used to implement Ethiopia's 2008 emergency obstetric and newborn care services (EmONC) assessment; highlight how the collaborative process contributed to immediate integration of results into national and subnational planning; and explain how the experience informed the development of a set of tools providing best practices and guidelines for other countries conducting similar assessments. A team of maternal and newborn health experts from the Federal Ministry of Health (FMOH), the United Nations Children's Fund (UNICEF), the World Health Organization (WHO), and the United Nations Population Fund (UNFPA), together with representatives from the Ethiopian Society of Obstetricians and Gynecologists, provided technical guidance for the 18-month process and facilitated demand for and use of the assessment results. Eighty-four trained data collectors administered 9 data collection modules in 806 public and private facilities. Field work and data were managed by a private firm who, together with the core team, implemented a multi-layered plan for data quality. Columbia University's Averting Maternal Death and Disability Program provided technical assistance. Results were published in national and regional reports and in 1-page facility factsheets informing subnational planning activities. Assessment results-which have been published in journal articles-informed water infrastructure improvements, efforts to expand access to magnesium sulfate, and FMOH and UN planning documents. The assessment also established a permanent database for future monitoring of the health system, including geographic locations of surveyed facilities. Ethiopia's assessment was successful largely because of active local leadership, a collaborative process, ample financial and technical support, and rapid integration of results into health system planning. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
40 CFR 62.14575 - What must I do if I close my CISWI unit and then restart it?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration... necessary process changes and air pollution control devices operate as designed. Waste Management Plan ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moss, R. H.; Blohm, A. J.; Delgado, A.
2015-08-15
U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before finalmore » conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure; (4) Vulnerability assessments can be connected to efforts to improve facility resilience to motivate participation; and (5) Efficient, scalable methods for vulnerability assessment can be developed, but additional case studies and evaluation are required.« less
NASA Technical Reports Server (NTRS)
Jester, Peggy L.; Hancock, David W., III
1999-01-01
This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.
Resource allocation planning with international components
NASA Technical Reports Server (NTRS)
Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David
1993-01-01
Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.
Seattle University: On the Threshold of the Eighties. A Five-Year Planning Report.
ERIC Educational Resources Information Center
Seattle Univ., WA.
A portrait of Seattle University is drawn in this first of a series of annual reports to the president and trustees on the progress of the formal, comprehensive, and systematic, systematic planning process at Seattle University, a process begun in 1975. Focus is on five areas: enrollment, academic programs, personnel, finance, and facilities and…
DOT National Transportation Integrated Search
2017-01-01
This project aimed to improve coordination and : cooperation among various entities in the : planning process for developing safer and more : efficient connections between intermodal : facilities and the highway network. Coordination : and cooperatio...
Developing a Shared Research Facility.
ERIC Educational Resources Information Center
Goodman, Ira S.; Newcomb, Elizabeth W.
1990-01-01
Planning, creation, and current operation of the Transgenic Mouse Research Facility at the New York University Kaplan Cancer Center are discussed. The university considered need, space, funding, supervision, and marketing and followed a logical and structured management process embodying both scientific and administrative input. (Author/MSE)
Waste processing building with incineration technology
NASA Astrophysics Data System (ADS)
Wasilah, Wasilah; Zaldi Suradin, Muh.
2017-12-01
In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.
23 CFR 450.320 - Congestion management process in transportation management areas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and... facilities eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53 through the use of... strategies, or combinations of strategies, are some examples of what should be appropriately considered for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
..., operate, maintain and decommission a maximum 350 megawatt (MW) photovoltaic facility and necessary... for renewable energy development. You may submit comments on issues and planning criteria in writing... considered through the plan amendment process to determine the suitability of the site for renewable energy...
Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poderis, Reed J.; King, Rebecca A.
This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less
Supporting NASA Facilities Through GIS
NASA Technical Reports Server (NTRS)
Ingham, Mary E.
2000-01-01
The NASA GIS Team supports NASA facilities and partners in the analysis of spatial data. Geographic Information System (G[S) is an integration of computer hardware, software, and personnel linking topographic, demographic, utility, facility, image, and other geo-referenced data. The system provides a graphic interface to relational databases and supports decision making processes such as planning, design, maintenance and repair, and emergency response.
Report on Collaborative Facilities Projects.
ERIC Educational Resources Information Center
California Community Colleges, Sacramento. Office of the Chancellor.
California's community colleges develop their own requests in concert with their district five-year master plan. They then submit those requests to the State Chancellor's Office for review. This document discusses the current process of submitting proposals for collaborative facilities projects, and outlines and discusses five recommendations for…
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
Planning Related to the Curation and Processing of Returned Martian Samples
NASA Astrophysics Data System (ADS)
McCubbin, F. M.; Harrington, A. D.
2018-04-01
Many of the planning activities in the NASA Astromaterials Acquisition and Curation Office at JSC are centered around Mars Sample Return. The importance of contamination knowledge and the benefits of a mobile/modular receiving facility are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... ``chemical process plants'' that produce ethanol through a natural fermentation process (hereafter referred... for excluding ``chemical process plants'' that produce ethanol through a natural fermentation process... facilities that produce ethanol by natural fermentation processes. Kentucky's February 5, 2010, SIP...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), SECOND FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), SECOND FLOOR SHOWING PROCESS MAKEUP AREA AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING COLD LAB, DECONTAMINATION ROOM, MULTICURIE CELL ROOM, AND OFFICES. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051980. ALTERNATE ID NUMBER CPP-E-1980. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
An ARM Mobile Facility Designed for Marine Deployments
NASA Astrophysics Data System (ADS)
Wiscombe, W. J.
2007-05-01
The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.
Avionics test bed development plan
NASA Technical Reports Server (NTRS)
Harris, L. H.; Parks, J. M.; Murdock, C. R.
1981-01-01
A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.
Hadron Physics with Antiprotons
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiedner, Ulrich
2005-10-26
The new FAIR facility which comes into operation at GSI in the upcoming years has a dedicated program of utilizing antiprotons for hadron physics. In particular, the planned PANDA experiment belongs to the group of core experiments at the new FAIR facility in Darmstadt/Germany. PANDA will be a universal detector to study the strong interaction by utilizing the annihilation process of antiprotons with protons and nuclear matter. The current paper gives an introduction into the hadron physics with antiprotons and part of the planned physics program with PANDA.
Automation of block assignment planning using a diagram-based scenario modeling method
NASA Astrophysics Data System (ADS)
Hwang, In Hyuck; Kim, Youngmin; Lee, Dong Kun; Shin, Jong Gye
2014-03-01
Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is be¬cause the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manu¬ally by experienced workers. In this study, a method of representing the block assignment rules using a diagram was su¬ggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.
Keeping Up with What You Have.
ERIC Educational Resources Information Center
Krysiak, Barbara H.
1999-01-01
Numerous studies have reported the deteriorating conditions in school buildings. One of the primary causes of this national problem is lack of proper maintenance of school facilities. Outlines a comprehensive assessment and planning process to provide a district with a road map for making decisions about facility improvement. (MLF)
Environmental Criteria: MR Preschool Day Care Facilities.
ERIC Educational Resources Information Center
Waligura, Randolph L.; And Others
Contributions of the physical environment to the learning process and environmental needs of preschool children are evaluated. Guidelines for the planning and design of preschool day care facilities, especially for mentally retarded and other children with developmental disabilities, are established. The current status and trends in day care…
Code of Federal Regulations, 2010 CFR
2010-07-01
... roads shall be generally 24 feet wide. (4) Pavement design. The pavement section of all roads, service... planning standards. 39.62 Space criteria for support facilities. 39.63 Architectural design standards... this part: (a) Establishment means the process of site selection, land acquisition, design and planning...
LaRC 20-Year Center Revitalization Plan
NASA Technical Reports Server (NTRS)
Mangum, Cathy H.; Harris, Charles E.; Allen, Cheryl L.; Craft, Stephen J.; Hope, Drew J.; Kegelman, Jerome T.; Mastaler, Michael D; Weiser, Erik S.
2012-01-01
LaRC has developed a 20-Year Center Revitalization Plan. The objective of this plan is to assure that the center infrastructure is sustainable for the long-term and that the center will have the essential facilities and laboratories to execute the future NASA mission. The plan was developed by a centerwide team, VITAL, and was approved by the Center Leadership Council (CLC) in March 2012. The revitalization plan will be implemented through the Center Master Planning process.
1998-09-28
The orbiter Atlantis is towed away from the Shuttle Landing Facility after returning home from California atop its Shuttle Carrier Aircraft. The orbiter spent 10 months in Palmdale undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
Gedik, Ridvan; Zhang, Shengfan; Rainwater, Chase
2017-06-01
A relatively new consideration in proton therapy planning is the requirement that the mix of patients treated from different categories satisfy desired mix percentages. Deviations from these percentages and their impacts on operational capabilities are of particular interest to healthcare planners. In this study, we investigate intelligent ways of admitting patients to a proton therapy facility that maximize the total expected number of treatment sessions (fractions) delivered to patients in a planning period with stochastic patient arrivals and penalize the deviation from the patient mix restrictions. We propose a Markov Decision Process (MDP) model that provides very useful insights in determining the best patient admission policies in the case of an unexpected opening in the facility (i.e., no-shows, appointment cancellations, etc.). In order to overcome the curse of dimensionality for larger and more realistic instances, we propose an aggregate MDP model that is able to approximate optimal patient admission policies using the worded weight aggregation technique. Our models are applicable to healthcare treatment facilities throughout the United States, but are motivated by collaboration with the University of Florida Proton Therapy Institute (UFPTI).
Launch and landing site science processing for ISS utilization
NASA Astrophysics Data System (ADS)
Shao, Mimi; van Twest, Jacqueline; van den Ende, Oliver; Gruendel, Douglas; Wells, Deborah; Moyer, Jerry; Heuser, Jan; Etheridge, Guy
2000-01-01
Since 1986, Kennedy Space Center (KSC) has provided support to over 500 spaceflight experiments from NASA, international agencies, academic institutions, commercial entities, and the military sector. The experiments cover a variety of science disciplines including molecular, cellular, developmental biology, chemistry, physiology, and material sciences. KSC supports simulation, pre-flight, in-flight, and post-flight processing of flight hardware, specimens, and data at the primary and secondary landing sites. Science processing activities for spaceflight experiments occurs at the Life Science Support Facility (Hangar L) on the Cape Canaveral Air Station (CCAS) and select laboratories in the Industrial Area at KSC. Planning is underway to meet the challenges of the International Space Station (ISS). ISS support activities are expected to exceed the current launch site capability. KSC plans to replace the current facilities with Space Experiments Research and Processing Laboratory (SERPL), a collaborative effort between NASA and the State of Florida. This facility will be the cornerstone of a larger Research Park at KSC and is expected to foster relations between commercial industry and academia in areas related to space research. .
2014-09-25
CAPE CANAVERAL, Fla. – Operations are underway to couple Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 on the track alongside the Indian River, north of Launch Complex 39 at NASA’s Kennedy Space Center in Florida. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
Adaptive management: a paradigm for remediation of public facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B
2009-01-01
Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less
Area Community College and Area Vocational School Construction.
ERIC Educational Resources Information Center
Iowa State Dept. of Public Instruction, Des Moines.
The purpose of this guideline is to assist in the planning process, to encourage good school plant design, and to serve as criteria in the evaluation of area community college and area vocational school plans. It is divided into the following five sections--(1) area plant planning, (2) area sites, (3) physical facilities, (4) service systems, and…
Perimeter security for Minnesota correctional facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crist, D.; Spencer, D.D.
1996-12-31
For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less
HYNOL PROCESS ENGINEERING: PROCESS CONFIGURATION, SITE PLAN, AND EQUIPMENT DESIGN
The report describes the design of the hydropyrolysis reactor system of the Hynol process. (NOTE: A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the Hynol process. The plant is bein...
303-K Storage Facility closure plan. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-15
Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
Using community-based evidence for decentralized health planning: insights from Maharashtra, India.
Shukla, Abhay; Khanna, Renu; Jadhav, Nitin
2018-01-01
Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.
East Spar: Alliance approach for offshore gasfield development
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
East spar is a gas/condensate field 25 miles west of Barrow Island, offshore Western Australia. Proved plus probable reserves at the time of development were estimated at 430 Bcf gas and 28 million bbl of condensate. The field was discovered in early 1993 when the Western Australia gas market was deregulated and the concept of a gas pipeline to the gold fields was proposed. This created a window of opportunity for East Spar, but only if plans could be established quickly. A base-case development plan was established to support gas marketing while alternative plans could be developed in parallel. Themore » completed East Spar facilities comprise two subsea wells, a subsea gathering system, and a multiphase (gas/condensate/water) pipeline to new gas-processing facilities. The subsea facilities are controlled through a navigation, communication, and control (NCC) buoy. The control room and gas-processing plant are 39 miles east of the field on Varanus Island. Sales gas is exported through a pre-existing gas-sales pipeline to the Dampier-Bunbury and Goldfields Gas Transmission pipelines. Condensate is stored in and exported by use of pre-existing facilities on Varanus Island. Field development from approval to first production took 22 months. The paper describes its field development.« less
Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Juarez, Catherine L.; Funk, David John; Vigil-Holterman, Luciana R.
2016-03-07
The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide themore » basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.« less
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (k) Certificate of need. If the loan request is for health care facilities (e.g., hospitals or... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
Integrating Sustainability Programs into the Facilities Capital Planning Process
ERIC Educational Resources Information Center
Buchanan, Susan
2011-01-01
With detailed information about the costs and benefits of potential green investments, educational facilities can effectively evaluate which initiatives will ultimately provide the greatest results over the short and long term. Based on its overall goals, every school, college, or university will have different values and therefore different…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... Sonoma County, California. The Site's main property contains a manufacturing building and adjoining... corner of the manufacturing facility. The Site building is currently occupied by three companies, which.... Sola manufactured ophthalmic lenses at the facility from 1978 through 2001. The manufacturing process...
DOE Office of Scientific and Technical Information (OSTI.GOV)
PALMER, M.E.
1999-09-21
Test Plan HNF-4351 defines testing requirements for installation of a new server in the WRAP Facility. This document shows the results of the test reports on the DMS-Y2K and DMS-F81 (Security) systems.
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1983-01-01
This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
ERIC Educational Resources Information Center
Crump, Kelvin
This paper presents a case study of the process of capital investment strategic planning at the Gold Coast Institute of Technical and Further Education (TAFE), Queensland, Australia. Capital investment strategic planning is a means of contributing to success by providing strategies to ensure that assets are managed efficiently, effectively, and…
Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
SIMMONS, F.M.
2000-03-29
This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
2016-03-01
Hospital providers voice concerns about a proposed rule by the Centers for Medicare and Medicaid Services (CMS) that would require providers to devote more resources to discharge planning. The rule would apply to inpatients as well as emergency patients requiring comprehensive discharge plans as opposed to discharge instructions. CMS states that the rule would ensure the prioritization of patient preferences and goals in the discharge planning process, and also would prevent avoidable complications and readmissions. However, hospital and emergency medicine leaders worry that community resources are not yet in place to facilitate the links and follow-up required in the proposed rule, and that the costs associated with implementation would be prohibitive. The proposed rule would apply to acute care hospitals, EDs, long-term care facilities, inpatient rehabilitation centers, and home health agencies. Regardless of the setting, though, CMS is driving home the message that patient preferences should be given more weight during the discharge planning process. Under the rule, hospitals or EDs would need to develop a patient-centered discharge plan within 24 hours of admission or registration, and complete the plan prior to discharge or transfer to another facility. Under the rule, emergency physicians would determine which patients require a comprehensive discharge plan. Both the American Hospital Association and the American College of Emergency Physicians worry that hospitals will have to take on more staff, invest in training, and make changes to their electronic medical record systems to implement the provisions in the proposed rule.
Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd
2012-12-01
Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.
Capacity planning for batch and perfusion bioprocesses across multiple biopharmaceutical facilities.
Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S
2014-01-01
Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2014 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers.
Capacity Planning for Batch and Perfusion Bioprocesses Across Multiple Biopharmaceutical Facilities
Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S
2014-01-01
Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2013 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers Biotechnol. Prog., 30:594–606, 2014 PMID:24376262
Caldwell, W J
1996-01-01
This article outlines the approaches taken to the management of two long-term care facilities by the County of Huron in southwestern Ontario in 1994. Lay-offs, a move to new facilities, loss of local political confidence, changes in key administrative personnel and low staff morale prompted the county to ask an interim administrative team to develop and implement an appropriate response. The article explains how community development and planning principles and techniques were applied to the management of the homes to achieve an overall improvement in communication, staff morale and attitude. These approaches may prove helpful to other administrations facing major change.
KSC facilities status and planned management operations. [for Shuttle launches
NASA Technical Reports Server (NTRS)
Gray, R. H.; Omalley, T. J.
1979-01-01
A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.
Wake County Public School System Design Guidelines.
ERIC Educational Resources Information Center
Wake County Public School System, Raleigh, NC.
The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Support.
The selection and planning of sites for school facilities can be critical and difficult due to the varied and complex demands schools must satisfy. This publication addresses the many factors that need consideration during the process of site selection, planning, development, and use. The report examines not only the site selection and planning…
Process auditing in long term care facilities.
Hewitt, S M; LeSage, J; Roberts, K L; Ellor, J R
1985-01-01
The ECC tool development and audit experiences indicated that there is promise in developing a process audit tool to monitor quality of care in nursing homes; moreover, the tool selected required only one hour per resident. Focusing on the care process and resident needs provided useful information for care providers at the unit level as well as for administrative personnel. Besides incorporating a more interdisciplinary focus, the revised tool needs to define support services most appropriate for nursing homes, includes items related to discharge planning and increases measurement of significant others' involvement in the care process. Future emphasis at the ECC will focus on developing intervention plans to maintain strengths and correct deficiencies identified in the audits. Various strategies to bring about desired changes in the quality of care will be evaluated through regular, periodic monitoring. Having a valid and reliable measure of quality of care as a tool will be an important step forward for LTC facilities.
The planned Alaska SAR Facility - An overview
NASA Technical Reports Server (NTRS)
Carsey, Frank; Weeks, Wilford
1987-01-01
The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
... ethanol through a natural fermentation process from the definition of ``chemical process plants'' in the... through a natural fermentation process from the definition of ``chemical process plants'' in the major NSR... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. King
2011-06-27
Summary of recent ORAU decommissioning activities at the Oak Ridge National Laboratory (ORNL) and the East Tennessee Technology Park (ETTP). Project objective was to generate approved Waste Lot Profiles for legacy facilities scheduled for demolition and shipment to the Environmental Management Waste Management Facility (EMWMF) or appropriate alternate facility. The form and content of process knowledge (PK) reports were developed with input from the EMWMF Waste Acceptance Criteria (WAC) Attainment Team and regulators. PK may be defined as the knowledge of the design and the history of operations that occurs during the life cycle of a facility (paraphrased from SRNLmore » guidance) - similar to the MARSSIM historical site assessment. Some types of PK data used to decommission ORNL and ETTP facilities include: (1) Design drawings; (2) Historical documents [e.g., History of the Oak Ridge National Laboratory by Thomas (1963) and A Brief History of the Chemical Technical Division (ORNL/M-2733)]; (3) Historical photographs; (4) Radiological survey reports; (5) Facility-specific databases - (a) Spill history, (b) Waste Information Tracking System (WITS), and (c) Hazardous Materials Management Information System (HMMIS); (6) Facility walkdown summary reports; and (7) Living memory data. Facility walkdowns are critical for worker safety planning and to assure on-the-ground-conditions match historical descriptions. For Oak Ridge operations, investigators also document the nature and number of items requiring special handling or disposition planning, such as the following: (1) Items containing polychlorinated biphenyls, asbestos, lead, or refrigerants; (2) Items with physical WAC restriction (e.g., large items, pipes, and concrete); and (3) Too 'hot' for EMWMF. Special emphasis was made to interview facility managers, scientists, technicians, or anyone with direct knowledge of process-related activities. Interviews often led to more contact names and reports but also offered anecdotal accounts of releases, process-related operations, maintenance activities, and other relevant information not addressed in the written record. 'Fun' part of PK data gathering. Often got not-so-useful information such as, 'The operations manager was a jerk and we all hated him.' PK data are used to indicate the presence or absence of contaminants. Multiple lines of investigation are necessary for characterization planning and to help determine which disposal facility is best suited for targeted wastes. The model used by ORAU assisted remediation contractors and EMWMF managers by identifying anomalous waste and items requiring special handling.« less
State-of-the-Art Facility: A Planning Process.
ERIC Educational Resources Information Center
Day, C. William; Speicher, A. Dean
Chief executive officers of school districts and facility planners must assume the role of change agent to meet the information needs of the 21st century. Public school learning, which will serve more groupings of people on a continual basis, will be disseminated through media learning centers. Management should follow six steps in planning…
ERIC Educational Resources Information Center
Roy, Ken
2010-01-01
If your lab facilities are going to be replaced or renovated, you should insist that the science instructors be involved in the process from planning to construction. You know what you'll need in a facility, and your input should be sought out by administrators and architects alike. Once construction is complete, changes can be very costly, so…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... interior panels, exterior siding, and tileboard. A typical flat wood coating facility applies stains and..., Volatile Organic Compounds from Specific Processes. This action affects facilities that apply stains and... these emission limits: lb VOC per gallon material (grams Surface coatings, inks, or adhesives applied to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... Permitting Rule for Cotton Gins AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... particulate matter emissions from cotton ginning facilities. The submitted Cotton Gin regulation provides an alternative preconstruction process for cotton ginning facilities that will emit no more than 50 tons per year...
1998-09-28
The orbiter Atlantis, being towed from the Shuttle Landing Facility, is reflected in waters from the Banana Creek next to the towway. The orbiter spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
PLOT PLAN OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS ...
PLOT PLAN OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS AND PROPOSED LOCATION OF FUEL ELEMENT CUTTING FACILITY. INL DRAWING NUMBER 200-0603-00-706-051287. ALTERNATE ID NUMBER CPP-C-1287. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Hafertepe, E C
1987-01-01
The Sisters of Charity Health Care System (SCHCS), Inc., Cincinnati, undertook a systemwide board evaluation project to support and enhance effective aspects of governance and to deal with obstacles that often arise due to differing beliefs and role confusion. A task force of chief executive officers developed the questionnaire, which was then administered to members of individual facilities' boards and the system's board. The documented highlighted value issues important to SCHCS's ministry and business activities: overall board responsibilities, financial responsibilities, strategic planning, the board's role, committee structures, the board's operating process, board education, and overall board effectiveness. The responses from each member were returned to the local boards, who analyzed them and developed an action plan. A summary of each facility's responses and action plans were forwarded to the system's corporate office. The CEO committee critiqued the process and reported on significant issues and action plans. In general, survey results revealed a strong influence of mission and philosophy in decision making, support for current processes, and effective interaction among board members. The system's corporate office will use the responses to respond to a dynamic environment and strengthen their role in the delivery of Catholic health care services.
Life sciences research on the space station: An introduction
NASA Technical Reports Server (NTRS)
1985-01-01
The Space Station will provide an orbiting, low gravity, permanently manned facility for scientific research, starting in the 1990s. The facilities for life sciences research are being designed to allow scientific investigators to perform research in Space Medicine and Space Biology, to study the consequences of long-term exposure to space conditions, and to allow for the permanent presence of humans in space. This research, using humans, animals, and plants, will provide an understanding of the effects of the space environment on the basic processes of life. In addition, facilities are being planned for remote observations to study biologically important elements and compounds in space and on other planets (exobiology), and Earth observations to study global ecology. The life sciences community is encouraged to plan for participation in scientific research that will be made possible by the Space Station research facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-01
This module includes the following: Regulatory Summary (Definitions; National Contingency Plan; Notification or Discovery; Response Process; Removal Process; Remedial Process; Community Involvement; State Role; Natural Resource Damage Assessments; Federal Facility Response; and Contractor Support); and Module Summary.
[Design of an HACCP program for a cocoa processing facility].
López D'Sola, Patrizia; Sandia, María Gabriela; Bou Rached, Lizet; Hernández Serrano, Pilar
2012-12-01
The HACCP plan is a food safety management tool used to control physical, chemical and biological hazards associated to food processing through all the processing chain. The aim of this work is to design a HACCP Plan for a Venezuelan cocoa processing facility.The production of safe food products requires that the HACCP system be built upon a solid foundation of prerequisite programs such as Good Manufacturing Practices (GMP) and Sanitation Standard Operating Procedures (SSOP). The existence and effectiveness of these prerequisite programs were previously assessed.Good Agriculture Practices (GAP) audit to cocoa nibs suppliers were performed. To develop the HACCP plan, the five preliminary tasks and the seven HACCP principles were accomplished according to Codex Alimentarius procedures. Three Critical Control Points (CCP) were identified using a decision tree: winnowing (control of ochratoxin A), roasting (Salmonella control) and metallic particles detection. For each CCP, Critical limits were established, the Monitoring procedures, Corrective actions, Procedures for Verification and Documentation concerning all procedures and records appropriate to these principles and their application was established. To implement and maintain a HACCP plan for this processing plant is suggested. Recently OchratoxinA (OTA) has been related to cocoa beans. Although the shell separation from the nib has been reported as an effective measure to control this chemical hazard, ochratoxin prevalence study in cocoa beans produced in the country is recommended, and validate the winnowing step as well
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martino, C.
An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components,more » antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).« less
Development of a master health facility list in Nigeria.
Makinde, Olusesan Ayodeji; Azeez, Aderemi; Bamidele, Samson; Oyemakinde, Akin; Oyediran, Kolawole Azeez; Adebayo, Wura; Fapohunda, Bolaji; Abioye, Abimbola; Mullen, Stephanie
2014-01-01
Abstract. Routine Health Information Systems (RHIS) are increasingly transitioning to electronic platforms in several developing countries. Establishment of a Master Facility List (MFL) to standardize the allocation of unique identifiers for health facilities can overcome identification issues and support health facility management. The Nigerian Federal Ministry of Health (FMOH) recently developed a MFL, and we present the process and outcome. The MFL was developed from the ground up, and includes a state code, a local government area (LGA) code, health facility ownership (public or private), the level of care, and an exclusive LGA level health facility serial number, as part of the unique identifier system in Nigeria. To develop the MFL, the LGAs sent the list of all health facilities in their jurisdiction to the state, which in turn collated for all LGAs under them before sending to the FMOH. At the FMOH, a group of RHIS experts verified the list and identifiers for each state. The national MFL consists of 34,423 health facilities uniquely identified. The list has been published and is available for worldwide access; it is currently used for planning and management of health services in Nigeria. Unique identifiers are a basic component of any information system. However, poor planning and execution of implementing this key standard can diminish the success of the RHIS. Development and adherence to standards is the hallmark for a national health information infrastructure. Explicit processes and multi-level stakeholder engagement is necessary to ensuring the success of the effort.
Development of a plan for automating integrated circuit processing
NASA Technical Reports Server (NTRS)
1971-01-01
The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.
1997-02-13
KENNEDY SPACE CENTER, FLA. - The Microgravity Science Laboratory-1 (MSL-1) Spacelab module is installed into the payload bay of the Space Shuttle Orbiter Columbia in Orbiter Processing Facility 1. The Spacelab long crew transfer tunnel that leads from the orbiter's crew airlock to the module is also aboard, as well as the Hitchhiker Cryogenic Flexible Diode (CRYOFD) experiment payload, which is attached to the right side of Columbia's payload bay. During the scheduled 16-day STS-83 mission, the MSL-1 will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the flight crew conducts combustion, protein crystal growth and materials processing experiments.
Process material management in the Space Station environment
NASA Technical Reports Server (NTRS)
Perry, J. L.; Humphries, W. R.
1988-01-01
The Space Station will provide a unique facility for conducting material-processing and life-science experiments under microgravity conditions. These conditions place special requirements on the U.S. Laboratory for storing and transporting chemicals and process fluids, reclaiming water from selected experiments, treating and storing experiment wastes, and providing vacuum utilities. To meet these needs and provide a safe laboratory environment, the Process Material Management System (PMMS) is being developed. Preliminary design requirements and concepts related to the PMMS are addressed, and the MSFC PMMS breadboard test facility and a preliminary plan for validating the overall system design are discussed.
Program planning for the community teaching hospital medical library.
McCorkel, J; Cook, V
1985-01-01
To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443
DOT National Transportation Integrated Search
1999-09-01
This booklet presents some of the successes of the community-sensitive transportation facility development process. Although a comprehensive process is described here, not every project involves the full range of steps. By applying the techniques out...
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
Word Processing for Technical Writers and Teachers.
ERIC Educational Resources Information Center
Mullins, Carolyn J.; West, Thomas W.
This discussion of the computing network and word processing facilities available to professionals on the Indiana University campuses identifies the word and text processing needs of technical writers and faculty, describes the current computing network, and outlines both long- and short-range objectives, policies, and plans for meeting these…
A scientific operations plan for the large space telescope. [ground support system design
NASA Technical Reports Server (NTRS)
West, D. K.
1977-01-01
The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.
Maryland State Department of Education School Food and Nutrition Service Design Manual.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
The purpose of this manual is to suggest strategies for identifying components that must be addressed to create and develop a successful food service and nutrition facility. It focuses on the process involved in creating such facilities, and it provides an overview of the planning phase, design and construction, and educational specifications.…
A Model Schedule for a Capital Improvement Program.
ERIC Educational Resources Information Center
Oates, Arnold D.; Burch, A. Lee
The Model Schedule for a Capital Improvement Program described in this paper encourages school leaders to consider a more holistic view of the planning process. It is intended to assist those responsible for educational facility planning, who must assure that all important and relevant tasks are accomplished in a timely manner. The model's six…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
... due to a recent unforeseen event, no processing facility is open in the West region. This emergency... Magnuson-Stevens Fishery Conservation and Management Act, the Fishery Management Plan for Bering Sea... and Aleutian Islands (BSAI) are managed under the Fishery Management Plan for Bering Sea/Aleutian...
Library Automation and Facility Planning.
ERIC Educational Resources Information Center
Cohen, Aaron; Cohen, Elaine
This seminar and workbook are designed to aid librarians in planning and designing attractive and efficient libraries in light of the changing technologies of the 1980s. It is based on the premise that the electronic revolution of the 1980s will cause substantial changes in the work force, work processes, and the nature of physical layouts of…
Beno, Sarah M; Stasiewicz, Matthew J; Andrus, Alexis D; Ralyea, Robert D; Kent, David J; Martin, Nicole H; Wiedmann, Martin; Boor, Kathryn J
2016-12-01
Pathogen environmental monitoring programs (EMPs) are essential for food processing facilities of all sizes that produce ready-to-eat food products exposed to the processing environment. We developed, implemented, and evaluated EMPs targeting Listeria spp. and Salmonella in nine small cheese processing facilities, including seven farmstead facilities. Individual EMPs with monthly sample collection protocols were designed specifically for each facility. Salmonella was detected in only one facility, with likely introduction from the adjacent farm indicated by pulsed-field gel electrophoresis data. Listeria spp. were isolated from all nine facilities during routine sampling. The overall Listeria spp. (other than Listeria monocytogenes ) and L. monocytogenes prevalences in the 4,430 environmental samples collected were 6.03 and 1.35%, respectively. Molecular characterization and subtyping data suggested persistence of a given Listeria spp. strain in seven facilities and persistence of L. monocytogenes in four facilities. To assess routine sampling plans, validation sampling for Listeria spp. was performed in seven facilities after at least 6 months of routine sampling. This validation sampling was performed by independent individuals and included collection of 50 to 150 samples per facility, based on statistical sample size calculations. Two of the facilities had a significantly higher frequency of detection of Listeria spp. during the validation sampling than during routine sampling, whereas two other facilities had significantly lower frequencies of detection. This study provides a model for a science- and statistics-based approach to developing and validating pathogen EMPs.
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2014 CFR
2014-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2013 CFR
2013-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
Improving energy audit process and report outcomes through planning initiatives
NASA Astrophysics Data System (ADS)
Sprau Coulter, Tabitha L.
Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first participating in a pre-audit planning activity that aligned the owner's priorities with the data collection. A comparative analysis was then used to evaluate the effects of the pre-audit planning activity in developing a more strategic method for collecting data and representing findings in an energy audit report to a facility owner. The case studies demonstrated that pre-audit planning has the potential to improve the efficiency of an energy audit process through reductions in transition time waste. The cases also demonstrated the value of audit report designs that are perceived by owners to be project specific vs. generic. The research demonstrated the ability to influence and alter an auditors' behavior through participating in a pre-audit planning activity. It also shows the potential benefits of using the House of Quality as a method of aligning data collection with owner's goals and priorities to develop reports that have increased value.
Update of KSC activities for the space transportation system
NASA Technical Reports Server (NTRS)
Gray, R. H.
1979-01-01
The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.
DOT National Transportation Integrated Search
2009-06-01
Many transportation projects require acquisition of land and accommodation of utility facilities in the : right-of-way. The Federal Highway Administration, American Association of State Highway and : Transportation Officials, and National Cooperative...
Progress on plutonium stabilization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurt, D.
1996-05-01
The Defense Nuclear Facilities Safety Board has safety oversight responsibility for most of the facilities where unstable forms of plutonium are being processed and packaged for interim storage. The Board has issued recommendations on plutonium stabilization and has has a considerable influence on DOE`s stabilization schedules and priorities. The Board has not made any recommendations on long-term plutonium disposition, although it may get more involved in the future if DOE develops plans to use defense nuclear facilities for disposition activities.
Implementing a research utilization plan for prevention of deep vein thrombosis.
Van Wicklin, Sharon A; Ward, Karen S; Cantrell, Shirley W
2006-06-01
Ensuring use of best practices is crucially important in today's health care system. Nurses can identify research results that offer promising new treatment options for their patients and should have a plan for implementing research findings. The perioperative education coordinator at one facility identified the occurrence of deep vein thrombosis as a significant problem. She conducted a literature review, created an education program for nurses, and implemented an evidence-based practice change. This article describes the steps in this process. Now, patients at the facility consistently are assessed for deep vein thrombosis and receive appropriate preventive treatment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GOLDBERG, H.J.
1999-05-18
The Waste Receiving and Processing (WRAP) Facility will store uranium and transuranic (TRU) sources and standards for certification that WRAP meets the requirements of the Quality Assurance Program Plan (QAPP) for the Waste Isolation Pilot Plant (WIPP). In addition, WRAP must meet internal requirements for testing and validation of measuring instruments for nondestructive assay (NDA). In order to be certified for WIPP, WRAP will participate in the NDA Performance Demonstration Program (PDP). This program is a blind test of the NDA capabilities for TRU waste. It is intended to ensure that the NDA capabilities of this facility satisfy the requirementsmore » of the quality assurance program plan for the WIPP. The PDP standards have been provided by the Los Alamos National Laboratory (LANL) for this program. These standards will be used in the WRAP facility.« less
The Sanford Underground Research Facility at Homestake (SURF)
Lesko, K. T.
2015-03-24
The former Homestake gold mine in Lead, South Dakota is being transformed into a dedicated laboratory to pursue underground research in rare-process physics, as well as offering research opportunities in other disciplines. A key component of the Sanford Underground Research Facility (SURF) is the Davis Campus, which is in operation at the 4850-foot level (4300 m.w.e) and currently hosts three projects: the LUX dark matter experiment, the Majorana Demonstrator neutrinoless double-beta decay experiment and the Berkeley and CUBED low-background counters. Plans for possible future experiments at SURF are well underway and include long baseline neutrino oscillation experiments, future dark mattermore » experiments as well as nuclear astrophysics accelerators. Facility upgrades to accommodate some of these future projects have already started. SURF is a dedicated facility with significant expansion capability. These plans include a Generation-2 Dark Matter experiment and the US flagship neutrino experiment, LBNE.« less
Applying social science and public health methods to community-based pandemic planning.
Danforth, Elizabeth J; Doying, Annette; Merceron, Georges; Kennedy, Laura
2010-11-01
Pandemic influenza is a unique threat to communities, affecting schools, businesses, health facilities and individuals in ways not seen in other emergency events. This paper aims to outline a local government project which utilised public health and social science research methods to facilitate the creation of an emergency response plan for pandemic influenza coincidental to the early stages of the 2009 H1N1 ('swine flu') outbreak. A multi-disciplinary team coordinated the creation of a pandemic influenza emergency response plan which utilised emergency planning structure and concepts and encompassed a diverse array of county entities including schools, businesses, community organisations, government agencies and healthcare facilities. Lessons learned from this project focus on the need for (1) maintaining relationships forged during the planning process, (2) targeted public health messaging, (3) continual evolution of emergency plans, (4) mutual understanding of emergency management concepts by business and community leaders, and (5) regional coordination with entities outside county boundaries.
3S (Safeguards, Security, Safety) based pyroprocessing facility safety evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ku, J.H.; Choung, W.M.; You, G.S.
The big advantage of pyroprocessing for the management of spent fuels against the conventional reprocessing technologies lies in its proliferation resistance since the pure plutonium cannot be separated from the spent fuel. The extracted materials can be directly used as metal fuel in a fast reactor, and pyroprocessing reduces drastically the volume and heat load of the spent fuel. KAERI has implemented the SBD (Safeguards-By-Design) concept in nuclear fuel cycle facilities. The goal of SBD is to integrate international safeguards into the entire facility design process since the very beginning of the design phase. This paper presents a safety evaluationmore » plan using a conceptual design of a reference pyroprocessing facility, in which 3S (Safeguards, Security, Safety)-By-Design (3SBD) concept is integrated from early conceptual design phase. The purpose of this paper is to establish an advanced pyroprocessing hot cell facility design concept based on 3SBD for the successful realization of pyroprocessing technology with enhanced safety and proliferation resistance.« less
Planning and Equipping Industrial Arts Facilities.
ERIC Educational Resources Information Center
Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.
Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…
Stick with a School Maintenance Plan
ERIC Educational Resources Information Center
Kennedy, Mike
2012-01-01
The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in…
NASA Technical Reports Server (NTRS)
Marks, D. A.; Gendiellee, R. E.; Kelly, T. M.; Giovannello, M. A.
1974-01-01
Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.
Real estate strategies for 2005.
Dunbar, Donald R
2005-05-01
Today's healthcare real estate strategies involve: assessing and prioritizing capital availability for building projects, carefully planning and implementing the process for the project Making beneficial decisions regarding facility management and maintenance.
SU-E-T-419: Workflow and FMEA in a New Proton Therapy (PT) Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, C; Wessels, B; Hamilton, H
2014-06-01
Purpose: Workflow is an important component in the operational planning of a new proton facility. By integrating the concept of failure mode and effect analysis (FMEA) and traditional QA requirements, a workflow for a proton therapy treatment course is set up. This workflow serves as the blue print for the planning of computer hardware/software requirements and network flow. A slight modification of the workflow generates a process map(PM) for FMEA and the planning of QA program in PT. Methods: A flowchart is first developed outlining the sequence of processes involved in a PT treatment course. Each process consists of amore » number of sub-processes to encompass a broad scope of treatment and QA procedures. For each subprocess, the personnel involved, the equipment needed and the computer hardware/software as well as network requirements are defined by a team of clinical staff, administrators and IT personnel. Results: Eleven intermediate processes with a total of 70 sub-processes involved in a PT treatment course are identified. The number of sub-processes varies, ranging from 2-12. The sub-processes within each process are used for the operational planning. For example, in the CT-Sim process, there are 12 sub-processes: three involve data entry/retrieval from a record-and-verify system, two controlled by the CT computer, two require department/hospital network, and the other five are setup procedures. IT then decides the number of computers needed and the software and network requirement. By removing the traditional QA procedures from the workflow, a PM is generated for FMEA analysis to design a QA program for PT. Conclusion: Significant efforts are involved in the development of the workflow in a PT treatment course. Our hybrid model of combining FMEA and traditional QA program serves a duo purpose of efficient operational planning and designing of a QA program in PT.« less
ERIC Educational Resources Information Center
Pinnell, Charles; Wacholder, Michael
The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…
40 CFR 35.925-1 - Facilities planning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...
Floor vibration evaluations for medical facilities
NASA Astrophysics Data System (ADS)
Himmel, Chad N.
2003-10-01
The structural floor design for new medical facilities is often selected early in the design phase and in renovation projects, the floor structure already exists. Because the floor structure can often have an influence on the location of vibration sensitive medical equipment and facilities, it is becoming necessary to identify the best locations for equipment and facilities early in the design process. Even though specific criteria for vibration-sensitive uses and equipment may not always be available early in the design phase, it should be possible to determine compatible floor structures for planned vibration-sensitive uses by comparing conceptual layouts with generic floor vibration criteria. Relatively simple evaluations of planned uses and generic criteria, combined with on-site vibration and noise measurements early in design phase, can significantly reduce future design problems and expense. Concepts of evaluation procedures and analyses will be presented in this paper. Generic floor vibration criteria and appropriate parameters to control resonant floor vibration and noise will be discussed for typical medical facilities and medical research facilities. Physical, economic, and logistical limitations that affect implementation will be discussed through case studies.
Space Technology for Book Preservation
NASA Technical Reports Server (NTRS)
1983-01-01
The Library of Congress has patented a process to extend book life. It is called vapor phased deacidification, and involves the use of DEZ (diethyl zinc), a chemical vapor which neutralizes acid and deposits an alkaline reserve on book pages. As the process must be done in an airless environment, the library utilized Goddard Space Flight Center's vacuum chamber for deacidification. The chamber can treat 5,000 books at once, and a new facility is planned. The Library plans to license the technology to private companies; several universities are interested in the process.
Direct heat geothermal opportunities at Pahoa, Hawaii
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreau, J.; Jones, W.L.
1980-09-01
A geothermal commercial park located near Pahoa, Hawaii, has been found to be technically feasible. However, community acceptance varies from optimistic support for the job opportunities to only lukewarm acceptance by most residents of the nearby planned residential community. Interviews, team evaluations, and calculations of energy and transportation savings were used to reduce a list of candidate processes to four. These four include an ethanol plant, a cattle feed mill, a protein recovery plant, and a papaya processing facility. In addition, a research laboratory is planned for the evaluation of other processes identified as very promising.
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
Planning for Materials Processing in Space
NASA Technical Reports Server (NTRS)
1977-01-01
A systems design study to describe the conceptual evolution, the institutional interrelationshiphs, and the basic physical requirements to implement materials processing in space was conducted. Planning for a processing era, rather than hardware design, was emphasized. Product development in space was examined in terms of fluid phenomena, phase separation, and heat and mass transfer. The effect of materials processing on the environment was studied. A concept for modular, unmanned orbiting facilities using the modified external tank of the space shuttle is presented. Organizational and finding structures which would provide for the efficient movement of materials from user to space are discussed.
Development of a Master Health Facility List in Nigeria
Azeez, Aderemi; Bamidele, Samson; Oyemakinde, Akin; Oyediran, Kolawole Azeez; Adebayo, Wura; Fapohunda, Bolaji; Abioye, Abimbola; Mullen, Stephanie
2014-01-01
Abstract Introduction Routine Health Information Systems (RHIS) are increasingly transitioning to electronic platforms in several developing countries. Establishment of a Master Facility List (MFL) to standardize the allocation of unique identifiers for health facilities can overcome identification issues and support health facility management. The Nigerian Federal Ministry of Health (FMOH) recently developed a MFL, and we present the process and outcome. Methods The MFL was developed from the ground up, and includes a state code, a local government area (LGA) code, health facility ownership (public or private), the level of care, and an exclusive LGA level health facility serial number, as part of the unique identifier system in Nigeria. To develop the MFL, the LGAs sent the list of all health facilities in their jurisdiction to the state, which in turn collated for all LGAs under them before sending to the FMOH. At the FMOH, a group of RHIS experts verified the list and identifiers for each state. Results The national MFL consists of 34,423 health facilities uniquely identified. The list has been published and is available for worldwide access; it is currently used for planning and management of health services in Nigeria. Discussion Unique identifiers are a basic component of any information system. However, poor planning and execution of implementing this key standard can diminish the success of the RHIS. Conclusion Development and adherence to standards is the hallmark for a national health information infrastructure. Explicit processes and multi-level stakeholder engagement is necessary to ensuring the success of the effort. PMID:25422720
Nonterrestrial material processing and manufacturing of large space systems
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. F.
1978-01-01
An attempt is made to provide pertinent and readily usable information on the extraterrestrial processing of materials and manufacturing of components and elements of these planned large space systems from preprocessed lunar materials which are made available at a processing and manufacturing site in space. Required facilities, equipment, machinery, energy and manpower are defined.
ERIC Educational Resources Information Center
Porter, Dennis R.; And Others
Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this fifth of ten manuals in the International Health Planning Methods Series deals with health facilities planning in developing countries. While several specific…
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...
ERIC Educational Resources Information Center
McIntosh, William A.
This guide lists a series of pivotal questions about the educational program to be offered, and the answers to these questions bear directly on the numbers and kinds of instructional areas needed in the contemplated facilities. Much of the material is presented in a checklist format which allows for consideration of alternatives in facility…
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
30 CFR 254.3 - May I cover more than one facility in my response plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...
30 CFR 254.3 - May I cover more than one facility in my response plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...
30 CFR 254.3 - May I cover more than one facility in my response plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...
Collaborative Mission Design at NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.
2005-01-01
NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... mining of coal. The Commission will use this EA in its decision-making process to determine whether the... work to be performed for the planned longwall coal mining activities of Emerald Coal Resources, LP... pipeline facilities at their certificated design capacities during the planned longwall mining activities...
2010-01-01
Planning Chapters Chapter 5 provides DSCA planning factors for response to all hazard events. Chapter 6 is a review of safety and operational/composite...risk management processes. Chapters 7 through 11 contain the Concepts of Operation (CONOPS) and details five natural hazards /disasters and the...Restoring critical public services and facilities through temporary measures • Identifying hazard mitigation opportunities 3.3.1.5 Rehabilitation
Hanford Site Asbestos Abatement Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mewes, B.S.
The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less
Wang, Duojin; Wu, Jing; Lin, Qinglian
2018-05-01
The home-based rehabilitation of elderly patients improves their autonomy, independence and reintegration into society. Hence, a suitable environment plays an important role in rehabilitation, as do different assistance technologies. The majority of accidents at home involving elderly people occur in the bathroom. Therefore, the planning of the layout of facilities is important in this potentially dangerous area. This paper proposes an approach towards designing and optimizing the layout of facilities in the bathroom, based on logistical and nonlogistical relationships. A fuzzy-based analytical hierarchical process (fuzzy-AHP) is then proposed for a comprehensive evaluation of the alternatives for this layout plan. This approach was applied to the home of a 71 years old female patient, who was experiencing home-based rehabilitation. After the initial designing and optimizing of the layout of the facilities in her bathroom, a plan could then be created for her particular needs. The results of this research could then enable the home-based rehabilitation of elderly patients to be more effective. Value: This paper develops a new approach to design and optimize the layout of facilities in bathroom for the elderly. Implications for Rehabilitation Develop a new approach to design and optimize the layout of facilities in bathroom. Provide a mathematical and more scientific approach to home layout design for home-based rehabilitation. Provide new opportunities for research, for both the therapist and the patient to analyse the home facility layout.
[Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].
Lee, Geauchul
2016-04-01
This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.
Integrate Evaluation into the Planning Process.
ERIC Educational Resources Information Center
Camp, William
1985-01-01
In an attempt to correct for limitations in the Program Evaluation and Review Technique-Critical Path Method (PERT-CPM), the Graphical Evaluation and Review Technique (GERT) has been developed. This management tool allows for evaluation during the facilities' development process. Two figures and two references are provided. (DCS)
Dorm Renovations: To Increase Enrollment or Maintain Status Quo?
ERIC Educational Resources Information Center
Stauff, William
2001-01-01
Explores South Carolina's Erskine College's planning and decision making process to renovate all seven of its dormitories over three summers. Discusses how the organization built a strong relationship with the contractor, successfully utilized outside architectural and consulting services, applied facilities management techniques in the process,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sari Izumo; Hideo Usui; Mitsuo Tachibana
Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which canmore » generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)« less
Nyandieka, Lilian Nyamusi; Kombe, Yeri; Ng'ang'a, Zipporah; Byskov, Jens; Njeru, Mercy Karimi
2015-01-01
In spite of the critical role of Emergency Obstetric Care in treating complications arising from pregnancy and childbirth, very few facilities are equipped in Kenya to offer this service. In Malindi, availability of EmOC services does not meet the UN recommended levels of at least one comprehensive and four basic EmOC facilities per 500,000 populations. This study was conducted to assess priority setting process and its implication on availability, access and use of EmOC services at the district level. A qualitative study was conducted both at health facility and community levels. Triangulation of data sources and methods was employed, where document reviews, in-depth interviews and focus group discussions were conducted with health personnel, facility committee members, stakeholders who offer and/ or support maternal health services and programmes; and the community members as end users. Data was thematically analysed. Limitations in the extent to which priorities in regard to maternal health services can be set at the district level were observed. The priority setting process was greatly restricted by guidelines and limited resources from the national level. Relevant stakeholders including community members are not involved in the priority setting process, thereby denying them the opportunity to contribute in the process. The findings illuminate that consideration of all local plans in national planning and budgeting as well as the involvement of all relevant stakeholders in the priority setting exercise is essential in order to achieve a consensus on the provision of emergency obstetric care services among other health service priorities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...
Overview of materials processing in space activity at Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Williams, J. R.; Chassay, R. P.; Moore, W. W.; Ruff, R. C.; Yates, I. C.
1984-01-01
An overview of activities involving the Space Transportation System (STS), now in the operational phase, and results of some of the current space experiments, as well as future research opportunities in microgravity environment, are presented. The experiments of the Materials Processing in Space Program flown on the STS, such as bioseparation processes, isoelectric focusing, solidification and crystal growth processes, containerless processes, and the Materials Experiment Assembly experiments are discussed. Special consideration is given to the experiments to be flown aboard the Spacelab 3 module, the Fluids Experiments System, and the Vapor Crystal Growth System. Ground-based test facilities and planned space research facilities, as well as the nature of the commercialization activities, are briefly explained.
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Deep space network resource scheduling approach and application
NASA Technical Reports Server (NTRS)
Eggemeyer, William C.; Bowling, Alan
1987-01-01
Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.
Use of automated rendezvous trajectory planning to improve spacecraft operations efficiency
NASA Technical Reports Server (NTRS)
Mulder, Tom A.
1991-01-01
The current planning process for space shuttle rendezvous with a second Earth-orbiting vehicle is time consuming and costly. It is a labor-intensive, manual process performed pre-mission with the aid of specialized maneuver processing tools. Real-time execution of a rendezvous plan must closely follow a predicted trajectory, and targeted solutions leading up to the terminal phase are computed on the ground. Despite over 25 years of Gemini, Apollo, Skylab, and shuttle vehicle-to-vehicle rendezvous missions flown to date, rendezvous in Earth orbit still requires careful monitoring and cannot be taken for granted. For example, a significant trajectory offset was experienced during terminal phase rendezvous of the STS-32 Long Duration Exposure Facility retrieval mission. Several improvements can be introduced to the present rendezvous planning process to reduce costs, produce more fuel-efficient profiles, and increase the probability of mission success.
242-A Evaporator quality assurance plan. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Basra, T.S.
1995-05-04
The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (calledmore » process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.« less
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top touches down at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft gently lands its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top arrives at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
A Timeline for Reroofing Success.
ERIC Educational Resources Information Center
Koontz, Jim
1998-01-01
Explains why timing is critical in reroofing educational facilities and saving costs. Provides an example of the planning process in the areas of priority setting, creating construction documents, bidding, and construction. Reroofing tips are highlighted. (GR)
CNPq/INPE-LANDSAT system report of activities
NASA Technical Reports Server (NTRS)
Parada, N. D. J. (Principal Investigator); Barbosa, M. N.
1982-01-01
The status of the Brazilian LANDSAT facilities and the results achieved are presented. In addition, a LANDSAT product sales/distribution analysis is provided. Data recording and processing capabilities and planned products are addressed.
Intelligent Transportation System Strategic Plan For Las Vegas Valley
DOT National Transportation Integrated Search
1996-11-01
"INTELLIGENT TRANSPORTATION SYSTEMS" (ITS) IS A COLLECTIVE TERM FOR MEASURES TARGETING THE EFFICIENT OPERATIONS AND MANAGEMENT OF TRANSPORTATION FACILITIES AND SERVICES, USUALLY INVOLVING THE USE OF ELECTRONIC EQUIPMENT FOR COLLECTING,. PROCESSING, R...
The Telecommunications and Data Aquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1983-01-01
Tracking and ground-based navigation techniques are discussed in relation to DSN advanced systems. Network data processing and productivity are studied to improve management planning methods. Project activities for upgrading DSN facilities are presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
..., refinery fuel gas is generated by the facility's processes and collected into two fuel gas mix drums, designated 41V-33 and 45V-39. The gases are then distributed from these mix drums to combustion units at the facility, such as boilers and heaters. FHR Pine Bend operates H 2 S CEMs on the mix drums to satisfy the...
ERIC Educational Resources Information Center
Kaiser, Harvey H.; Kirkwood, Dennis M.
2000-01-01
Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-17
... natural gas 7/22/1998 6/17/1998 Repeal and readoption disapproval. processing, as Section treating, or 116... for Changes at Certain Natural Gas Processing, Treating, or Compression Facilities 1. What is the... the following grounds: This definition exempts changes at certain natural gas processing, treating, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries AGENCY: Environmental... that establishes controls for nitrogen oxides (NO X ) emissions from industrial boilers and process... carbon monoxide (CO) boiler at the Delaware City Refinery and providing for a facility-wide NOx emission...
Systematic Planning for Educational Facilities.
ERIC Educational Resources Information Center
McGuffey, Carroll W.
This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…
DOT National Transportation Integrated Search
2008-12-01
"This report is the result of a two-part study intended to provide input to WYDOTs long-term planning process for the I-80 facility. The first phase of the study involved an on-the-ground freight survey of over 2,000 truckers traveling eastbound a...
Strategic benefits of master facility plans.
Shannon, K
1996-02-01
In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana
2014-11-01
Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.
Code of Federal Regulations, 2012 CFR
2012-10-01
... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...
Code of Federal Regulations, 2010 CFR
2010-10-01
... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...
Code of Federal Regulations, 2013 CFR
2013-10-01
... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...
NASA Technical Reports Server (NTRS)
Frost, R. T.; Bloom, H. L.; Napaluch, L. J.; Stockhoff, E. H.; Wouch, G.
1974-01-01
Containerless melting, reaction, and solidification experiments and processes which potentially can lead to new understanding of material science and production of new or improved materials in the weightless space environment are reviewed in terms of planning for spacelab. Most of the experiments and processes discussed are amenable to the employment of electromagnetic position control and electromagnetic induction or electron beam heating and melting. The spectrum of relevant properties of materials, which determine requirements for a space laboratory electromagnetic containerless processing facility are reviewed. Appropriate distributions and associated coil structures are analyzed and compared on the basis of efficiency, for providing the functions of position sensing, control, and induction heating. Several coil systems are found capable of providing these functions. Exchangeable modular coils in appropriate sizes are recommended to achieve the maximum power efficiencies, for a wide range of specimen sizes and resistivities, in order to conserve total facility power.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-23
... ethanol through a natural fermentation process (hereafter referred to as the ``Ethanol Rule'') from the... exception of the phrase ``except ethanol production facilities producing ethanol by natural fermentation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
...: (1) Provisions to exclude facilities that produce ethanol through a natural fermentation process... fermentation under the North American Industry Classification System (NAICS) codes 325193 or 312140,'' APC-S- 5...
NASA Technical Reports Server (NTRS)
Wilcox, Margaret
2008-01-01
A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, J. G.; Morton, R. L.; Castillo, C.
2011-02-01
A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell intomore » two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.« less
Advanced High-Level Waste Glass Research and Development Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peeler, David K.; Vienna, John D.; Schweiger, Michael J.
2015-07-01
The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations formore » both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al 2O 3, Cr 2O 3, SO 3 and Na 2O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.« less
A Model for a Level II Emergency Room
1989-05-02
the financial resources which will be consumed, and the Z inm chanQes in the way work will be accomplished. Health care facilities, in general...pursued with the anticipation of action results rather than an academic exercise. The planning process in a health care facility must work within the...Malcolm Grow USAF Medical Center of sufficient size and efficient functional configuration to provide a comprehensive and cost effective range health
Defense Facility Condition: Revised Guidance Needed to Improve Oversight of Assessments and Ratings
2016-06-01
are to implement the standardized process in part by assessing the condition of buildings, pavement , and rail using the same set of software tools...facility to current standards; costs for labor, equipment, materials, and currency exchange rates overseas; costs for project planning and design ...example, the services are to assess the condition of buildings, pavement , and rail using Sustainment Management System software tools developed by the
2003-08-20
KENNEDY SPACE CENTER, FLA. - Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo on their visit to the Spacehab facility in Cape Canaveral, Fla. They were awarded the trip when their experiments were chosen to fly on mission STS-107. The group was also meeting with American students from Melbourne and Jacksonville, Fla. The girls planned a floral tribute at the STS-107 memorial stone at the facility. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station and Payloads Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students’ visit.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yavas, Oe.
The Turkish Accelerator Center (TAC) Project was started in 1997 with support of the State Planning Organization (SPO) of Turkey under Ankara University's coordination. After completing Feasibility Report (FR, 2000) and Conceptual Design Repot (CDR, 2005), third phase of the project was started in 2006 as an inter-university project with support of SPO. Third phase of the project has two main scientific goals: to write Technical Design Report (TDR) of TAC and to establish an Infrared Free Electron Laser (IR FEL) facility as a first step. The first facility and TDR studies are planned to be completed in 2012. Constructionmore » phase of TAC will cover 2013-2023. TAC collaboration include ten Turkish Universities: Ankara, Gazi, Istanbul, Bogazici, Dogus, Uludag, Dumlupmar, Nigde, Erciyes and S. Demirel Universities. It was planned that the first facility will be an IR FEL and Bremsstrahlung laboratory based on 15-40 MeV electron linac and two optical cavities with 2.5 and 9 cm undulators to scan 2-250 microns wavelength range. Main purpose of the facility is to use IR FEL for research in material science, nonlinear optics, semiconductors, biotechnology, medicine and photochemical processes. In this study; aims, regional importance, main parts and main parameters of TAC and TAC IR FEL and Bremsstrahlung facility are explained. Road map of the TAC project is given. National and international collaborations are explained.« less
Building 9401-2 Plating Shop Surveillance and Maintenance Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1999-05-01
This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes,more » and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.« less
1983-06-01
constrained at each step. Use of dis- crete simulation can be a powerful tool in this process if its role is carefully planned. The gross behavior of the...by projecting: - the arrival of units of work at SPLICE processing facilities (workload analysis) . - the amount of processing resources comsumed in
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Liquid secondary waste. Waste form formulation and qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cozzi, A. D.; Dixon, K. L.; Hill, K. A.
The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during Site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilization Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the Integrated Disposal Facility IDF). Waste form testingmore » to support this plan is composed of work in the near term to demonstrate the waste form will provide data as input to a performance assessment (PA) for Hanford’s IDF.« less
End State Condition Report for Materials and Fuels Complex Facilities MFC-799, 799A, and 770C
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Mecham
2010-10-01
The Materials and Fuels Complex (MFC) facilities MFC-799, “Sodium Processing Facility” (a single building consisting of two areas: the Sodium Process Area and the Carbonate Process Area); MFC-799A, “Caustic Storage Area;” and MFC-770C, “Nuclear Calibration Laboratory,” have been declared excess to future Department of Energy (DOE) Office of Nuclear Energy(NE) mission requirements. Transfer of these facilities from NE to the DOE Office of Environmental Management (EM), and an associated schedule for doing so, have been agreed upon by the two offices. This report documents the completion of pre-transfer stabilization actions, as identified in DOE Guide 430.1-5, “Transition Implementation Guide,” formore » buildings MFC-799/799A and 770C, and indicates that these facilities are ready for transfer from NE to EM. The facilities are in a known, safe condition and information is provided to support efficient decommissioning and demolition (D&D) planning while minimizing the possibility of encountering unforeseen circumstances during the D&D activities.« less
A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.
ERIC Educational Resources Information Center
PEERY, A.B.
A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...
40 CFR 62.5100 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Plan for Control... plan. (a) Identification of plan. Maryland Plan for Control Designated Pollutants from Existing Facilities (Section 111(d) plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric...
40 CFR 62.10100 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...
School Data Processing Services in Texas. A Cooperative Approach. [Revised.
ERIC Educational Resources Information Center
Texas Education Agency, Austin. Management Information Center.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESC). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions; each of the five…
School Data Processing Services in Texas: A Cooperative Approach.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESC). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions; each of the five…
School Data Processing Services in Texas: A Cooperative Approach.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESO). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions each of the five…
A Teacher Activist's Response to Schools Closing
ERIC Educational Resources Information Center
Reed, Sam, III
2013-01-01
In this article, the author presents his thoughts, as a teacher activist, on the school closing process in Philadelphia, particularly the effect of the closing process on Beeber Middle School and its response to the closing. The District's Facilities Master Plan originally called for closing 37 schools, Some schools were removed from the closing…
25 CFR 170.426 - What is the approval process for the IRRTIP?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What is the approval process for the IRRTIP? 170.426 Section 170.426 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
Practical solution concepts for planning and designing roadways in Kentucky.
DOT National Transportation Integrated Search
2008-10-01
Kentucky's highway agency has embarked upon an initiative tagged "Practical Solutions" which sets its goal toward reducing costs throughout the project development process extended into operations and maintenance of all highway facilities. This study...
40 CFR 35.917-9 - Revision or amendment of facilities plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...
40 CFR 35.917-9 - Revision or amendment of facilities plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...
40 CFR 35.917-9 - Revision or amendment of facilities plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...
40 CFR 35.917-9 - Revision or amendment of facilities plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...
National Ignition Facility project acquisition plan revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clobes, A.R.
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.
Applications of Modeling and Simulation for Flight Hardware Processing at Kennedy Space Center
NASA Technical Reports Server (NTRS)
Marshall, Jennifer L.
2010-01-01
The Boeing Design Visualization Group (DVG) is responsible for the creation of highly-detailed representations of both on-site facilities and flight hardware using computer-aided design (CAD) software, with a focus on the ground support equipment (GSE) used to process and prepare the hardware for space. Throughout my ten weeks at this center, I have had the opportunity to work on several projects: the modification of the Multi-Payload Processing Facility (MPPF) High Bay, weekly mapping of the Space Station Processing Facility (SSPF) floor layout, kinematics applications for the Orion Command Module (CM) hatches, and the design modification of the Ares I Upper Stage hatch for maintenance purposes. The main goal of each of these projects was to generate an authentic simulation or representation using DELMIA V5 software. This allowed for evaluation of facility layouts, support equipment placement, and greater process understanding once it was used to demonstrate future processes to customers and other partners. As such, I have had the opportunity to contribute to a skilled team working on diverse projects with a central goal of providing essential planning resources for future center operations.
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft rolls to a stop with its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. In the background is the Vehicle Assembly Building. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- Stairs are rolled to the forward opening of the Shuttle Carrier Aircraft with its piggyback cargo, the orbiter Atlantis after it rolls to a stop at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
40 CFR 62.8350 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Carolina Plan for... Identification of plan. (a) Identification of plan. North Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric acid mist emissions from...
Developing clinical leadership capability.
Pintar, Kristi A; Capuano, Terry A; Rosser, Gwendolyn D
2007-01-01
Nursing facilities must be committed to ongoing leadership development and to developing and retaining their staff in the increasingly competitive healthcare market. In this article, the authors share the processes involved in creating a focused small group approach to developing clinical leaders. Programmatic approaches to development, clarity of needs of those targeted for development, individual development plans, external expertise partnerships, and small group session dynamics are discussed. Applications of the process and lessons learned from the program will benefit others in their efforts to enhance organization succession planning, leadership development, group learning, and program administration.
Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder
2007-04-02
Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.
Recent advances and plans in processing and geocoding of SAR data at the DFD
NASA Technical Reports Server (NTRS)
Noack, W.
1993-01-01
Because of the needs of future projects like ENVISAT and the experiences made with the current operational ERS-1 facilities, a radical change in the synthetic aperture radar (SAR) processing scenarios can be predicted for the next years. At the German PAF several new developments were initialized which are driven mainly either by user needs or by system and operational constraints ('lessons learned'). At the end there will be a major simplification and uniformation of all used computer systems. Especially the following changes are likely to be implemented at the German PAF: transcription before archiving, processing of all standard products with high throughput directly at the receiving stations, processing of special 'high-valued' products at the PAF, usage of a single type of processor hardware, implementation of a large and fast on-line data archive, and improved and unified fast data network between the processing and archiving facilities. A short description of the current operational SAR facilities as well as the future implementations are given.
Industrialization of the mirror plate coatings for the ATHENA mission
NASA Astrophysics Data System (ADS)
Massahi, S.; Christensen, F. E.; Ferreira, D. D. M.; Shortt, B.; Collon, M.; Sforzini, J.; Landgraf, B.; Hinze, F.; Aulhorn, S.; Biedermann, R.
2017-08-01
In the frame of the development of the Advanced Telescope for High-ENergy Astrophysics (Athena) mission, currently in phase A, ESA is continuing to mature the optics technology and the associated mass production techniques. These efforts are driven by the programmatic and technical requirement of reaching TRL 6 prior to proposing the mission for formal adoption (planned for 2020). A critical part of the current phase A preparation activities is addressing the industrialization of the Silicon Pore Optics mirror plates coating. This include the transfer of the well-established coating processes and techniques, performed at DTU Space, to an industrial scale facility suitable for coating the more than 100,000 mirror plates required for Athena. In this paper, we explain the considerations for the planned coating facility including, requirement specification, equipment and supplier selection, preparing the coating facility for the deposition equipment, designing and fabrication.
Planning for progress, productivity, and performance.
Benedict, J M
1983-10-01
A project is described for the interim renovation of a labor intensive existing foodservice facility. The renovated area will provide effective food management during the hospital's redevelopment period, including a new foodservice. Objectives of the interim project were to conserve labor while emphasizing control and centralization, provide economic foodservices with improved quality, and incorporate one tray distribution system throughout the hospital complex. Immediate measures were necessary in order to generate funds to proceed. Renovations had to occur without disrupting food-service to patients. The project was planned over a three year period and included an ingredient control area, two patient tray service centres, a renewed production kitchen and test kitchen facility. Each phase has been financed on the understanding that the costs of construction and equipment will be repaid within one fiscal year of operating the renovated facility. Positive results are being achieved, attributable to the support and encouragement received from staff during the change process.
Zhang, Xiangping; Strømman, Anders H; Solli, Christian; Hertwich, Edgar G
2008-07-01
Industrial symbiosis promises environmental and economic gains through a utilization of the waste of some processes as a resource for other processes. Because of the costs and difficulties of transporting some wastes, the largest theoretical potential for industrial symbiosis is given when facilities are colocated in an eco-industrial park (EIP). This study proposes a model-centered approach with an eight-step procedure for the early planning and design of an eco-industrial park considering technical and environmental factors. Chemical process simulation software was used to model the energy and material flows among the prospective members and to quantify the benefits of integration among different firms in terms of energy and resources saved as compared to a reference situation. Process simulation was based on a combination of physical models of industrial processes and empirical models. The modeling allows for the development and evaluation of different collaboration opportunities and configurations. It also enables testing chosen configurations under hypothetical situations or external conditions. We present a case study around an existing oil and gas refinery in Mongstad, Norway. We used the approach to propose the colocation of a number of industrial facilities around the refinery, focused on integrating energy use among the facilities. An EIP with six main members was designed and simulated, matching new hypothetical members in size to the existing operations, modeling material and energy flows in the EIP, and assessing these in terms of carbon and hydrogen flows.
40 CFR 265.55 - Emergency coordinator.
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITIES Contingency Plan and Emergency Procedures § 265.55 Emergency coordinator. At all times, there must... aspects of the facility's contingency plan, all operations and activities at the facility, the location... out the contingency plan. [Comment: The emergency coordinator's responsibilities are more fully...
NASA Astrophysics Data System (ADS)
Taravat, A.; Yari, A.; Rajaei, M.; Mousavian, R.
2014-10-01
Public spaces accessibility has become one of the important factors in urban planning. Therefore, considerable attention has been given to measure accessibility to public spaces on the UK, US and Canada, but there are few studies outside the anglophone world especially in developing countries such as Iran. In this study an attempt has been made to measure objective accessibility to public spaces (parks, school, library and administrative) using fuzzy majority GIS-based multicriteria decision analysis. This method is for defining the priority for distribution of urban facilities and utilities as the first step towards elimination of social justice. In order to test and demonstrate the presented model, the comprehensive plan of Malayer city has been considered for ranking in three objectives and properties in view of index per capital (Green space, sport facilities and major cultural centers like library and access index). The results can be used to inform the local planning process and the GIS approach can be expanded into other local authority domains. The results shows that the distribution of facilities in Malayer city has followed on the base of cost benefit law and the human aspect of resource allocation programming of facilities (from centre to suburbs of the city).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, F. C.
2013-11-18
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sluldge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass.
An overview of the on-orbit contamination of the Long Duration Exposure Facility (LDEF)
NASA Technical Reports Server (NTRS)
Stuckey, W. K.
1993-01-01
Contamination that leads to degradation of critical surfaces becomes a vital design issue for many spacecraft programs. One of the processes that must be considered is the on-orbit accumulation of contaminants. The Long Duration Exposure Facility (LDEF) has presented an opportunity to examine the deposits on surfaces returned from orbit in order to help in understanding the deposition processes and the current models used to predict spacecraft contamination levels. The results from various investigators on the contamination of LDEF have implications for material selection, contamination models, and contamination control plans for the design of future spacecraft.
Schwartz, Rachel D
2008-01-01
With the growing threat of a naturally occurring or man-made global pandemic, many public, private, federal, state, and local institutions have begun to develop some form of preparedness and response plans. Among those in the front lines of preparedness are hospitals and medical professionals who will be among the first responders in the event of such a disaster. At the other end of the spectrum of preparedness is the Corrections community who have been working in a relative vacuum, in part because of lack of funding, but also because they have been largely left out of state, federal local planning processes. This isolation and lack of support is compounded by negative public perceptions of correctional facilities and their inmates, and a failure to understand the serious impact a jail or prison facility would have on public health in the event of a disaster. This article examines the unique issues faced by correctional facilities responding to disease disasters and emphasizes the importance of assisting them to develop workable and effective preparedness and response plans that will prevent them from becoming disease repositories spreading illness and infection throughout our communities. To succeed in such planning, it is crucial that the public health and medical community be involved in correctional disaster planning and that they should integrate correctional disaster response with their own. Failure to do so endangers the health of the entire nation.
RMP Guidance for Chemical Distributors - Chapter 8: Emergency Response Program
Depending on the level of processes at your facility, part 68 may require an emergency response program: an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... facilities that produce ethanol through a natural fermentation process from the definition of ``chemical..., modeling and attainment demonstrations, NSR, and the impact to reformulated gas for the 1997 8- hour ozone...
ERIC Educational Resources Information Center
Miller, Juliet V.; Wargel, James F.
Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…
National Transonic Facility Fan Blade prepreg material characterization tests
NASA Technical Reports Server (NTRS)
Klich, P. J.; Richards, W. H.; Ahl, E. L., Jr.
1981-01-01
The test program for the basic prepreg materials used in process development work and planned fabrication of the national transonic facility fan blade is presented. The basic prepreg materials and the design laminate are characterized at 89 K, room temperature, and 366 K. Characterization tests, test equipment, and test data are discussed. Material tests results in the warp direction are given for tensile, compressive, fatigue (tension-tension), interlaminar shear and thermal expansion.
Space station systems analysis study. Part 1, volume 1: Executive study
NASA Technical Reports Server (NTRS)
1976-01-01
Potential space station system options were examined for a permanent, manned, orbital space facility and to provide data to NASA program planners and decision makers for their use in future program planning. There were ten space station system objectives identified. These were categorized into five major objectives and five supporting objectives. The major objectives were to support the development of: (1) satellite power systems, (2) nuclear energy plants in space, (3) space processing, (4) earth services, and (5) space cosmological research and development. The five supporting objectives, to define space facilities which would be basic building blocks for future systems, were: (1) a multidiscipline science laboratory, (2) an orbital depot to maintain, fuel, and service orbital transfer vehicles, (3) cluster support systems to provide power and data processing for multiple orbital elements, (4) a sensor development facility, and (5) the facilities necessary to enhance man's living and working in space.
United Space Alliance LLC Parachute Refurbishment Facility Model
NASA Technical Reports Server (NTRS)
Esser, Valerie; Pessaro, Martha; Young, Angela
2007-01-01
The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.
International Space Station Payload Training Overview
NASA Technical Reports Server (NTRS)
Underwood, Deborah B.; Noneman, Steven R.; Sanchez, Julie N.
2001-01-01
This paper describes payload crew training-related activities performed by NASA and the U.S. Payload Developer (PD) community for the International Space Station (ISS) Program. It describes how payloads will be trained and the overall training planning and integration process. The overall concept, definition, and template for payload training are described. The roles and responsibilities of individuals, organizations, and groups involved are discussed. The facilities utilized during payload training and the primary processes and activities performed to plan, develop, implement, and administer payload training for ISS crews are briefly described. Areas of improvement to crew training processes that have been achieved or are currently being worked are identified.
75 FR 13806 - Agency Information Collection Activity Seeking OMB Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... 40117(k), Competition Plans, and to carry out a passenger facility charge application. DATES: Please... . SUPPLEMENTARY INFORMATION: Federal Aviation Administration (FAA) Title: Competition Plans, Passenger Facility...), Competition Plans, and to carry out a passenger facility charge application. The affected public includes...
ERIC Educational Resources Information Center
New York State Education Dept., Albany.
PLANNING OUTDOOR PHYSICAL EDUCATION FACILITIES FOR THE CENTRAL SCHOOL SERVING PUPILS FROM KINDERGARTEN THROUGH HIGH SCHOOL SHOULD TAKE INTO ACCOUNT THE NEEDS AND INTERESTS OF ALL PUPILS DURING THE SCHOOL YEAR AND SHOULD PROVIDE FOR RECREATION NEEDS DURING VACATION PERIODS. PROVISION FOR RECREATIONAL FACILITIES FOR ADULTS SHOULD ALSO BE MADE. THE…
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated August 14, 1995: 'KSC plant physiologist Dr. Gary Stutte harvests a potato grown in the Biomass Production Chamber of the Controlled environment Life Support system (CELSS) in Hangar L at Cape Canaveral Air Station. During a 418-day 'human rated' experiment, potato crops grown in the chamber provided the equivalent of a continuous supply of the oxygen for one astronaut, along with 55 percent of that long-duration space flight crew member's caloric food requirements and enough purified water for four astronauts while absorbing their expelled carbon dioxide. The experiment provided data that will help demonstarte the feasibility of the CELSS operating as a bioregenerative life support system for lunar and deep-space missions that can operate independently without the need to carry consumables such as air, water and food, while not requiring the expendable air and water system filters necessary on today's human-piloted spacecraft.' His work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated August 14, 1995: 'KSC plant physiologist Dr. Gary Stutte (right) and Cheryl Mackowiak harvest potatoes grown in the Biomass Production Chamber of the Controlled Enviornment Life Support System (CELSS in Hangar L at Cape Canaveral Air Station. During a 418-day 'human rated' experiment, potato crops grown in the chamber provided the equivalent of a continuous supply of the oxygen for one astronaut, along with 55 percent of that long-duration space flight crew member's caloric food requirements and enough purified water for four astronauts while absorbing their expelled carbon dioxide. The experiment provided data that will help demonstarte the feasibility of the CELSS operating as a bioregenerative life support system for lunar and deep-space missions that can operate independently without the need to carry consumables such as air, water and food, while not requiring the expendable air and water system filters necessary on today's human-piloted spacecraft.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
40 CFR 62.1100 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...
40 CFR 62.1100 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...
40 CFR 62.1100 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...
40 CFR 62.1100 - Identification of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...
40 CFR 62.1100 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...
Satellite land use acquisition and applications to hydrologic planning models
NASA Technical Reports Server (NTRS)
Algazi, V. R.; Suk, M.
1977-01-01
A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.
NASA Astrophysics Data System (ADS)
Whitehouse, C. R.; Barnett, S. J.; Soley, D. E. J.; Quarrell, J.; Aldridge, S. J.; Cullis, A. G.; Emeny, M. T.; Johnson, A. D.; Clarke, G. F.; Lamb, W.; Tanner, B. K.; Cottrell, S.; Lunn, B.; Hogg, C.; Hagston, W.
1992-01-01
This paper describes a unique combined UHV MBE growth x-ray topography facility designed to allow the first real-time synchrotron radiation x-ray topography study of strained-layer III-V growth processes. This system will enable unambiguous determination of dislocation nucleation and multiplication processes as a function of controlled variations in growth conditions, and also during post-growth thermal processing. The planned experiments have placed very stringent demands upon the engineering design of the system, and design details regarding the growth chamber; sample manipulator, x-ray optics, and real-time imaging systems are described. Results obtained during a feasibility study are also presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitehouse, C.R.; Barnett, S.J.; Soley, D.E.J.
1992-01-01
This paper describes a unique combined UHV MBE growth x-ray topography facility designed to allow the first real-time synchrotron radiation x-ray topography study of strained-layer III--V growth processes. This system will enable unambiguous determination of dislocation nucleation and multiplication processes as a function of controlled variations in growth conditions, and also during post-growth thermal processing. The planned experiments have placed very stringent demands upon the engineering design of the system, and design details regarding the growth chamber; sample manipulator, x-ray optics, and real-time imaging systems are described. Results obtained during a feasibility study are also presented.
Green Schools as High Performance Learning Facilities
ERIC Educational Resources Information Center
Gordon, Douglas E.
2010-01-01
In practice, a green school is the physical result of a consensus process of planning, design, and construction that takes into account a building's performance over its entire 50- to 60-year life cycle. The main focus of the process is to reinforce optimal learning, a goal very much in keeping with the parallel goals of resource efficiency and…
Commerce Lab - An enabling facility and test bed for commercial flight opportunities
NASA Technical Reports Server (NTRS)
Robertson, Jack; Atkins, Harry L.; Williams, John R.
1986-01-01
Commerce Lab is conceived as an adjunct to the National Space Transportation System (NSTS) by providing a focal point for commercial missions which could utilize existing NSTS carrier and resource capabilities for on-orbit experimentation in the microgravity sciences. In this context, the Commerce Lab provides an enabling facility and test bed for commercial flight opportunities. Commerce Lab program activities to date have focused on mission planning for private sector involvement in the space program to facilitate the commercial exploitation of the microgravity environment for materials processing research and development. It is expected that Commerce Lab will provide a logical transition between currently planned NSTS missions and future microgravity science and commercial R&D missions centered around the Space Station. The present study identifies candidate Commerce Lab flight experiments and their development status and projects a mission traffic model that can be used in commercial mission planning.
42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 3 2012-10-01 2012-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...
42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 3 2014-10-01 2014-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...
42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 3 2011-10-01 2011-10-01 false Eligibility to elect an MA plan for senior housing..., Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan, the...
42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 3 2013-10-01 2013-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...
NASA's Advanced Life Support Systems Human-Rated Test Facility
NASA Technical Reports Server (NTRS)
Henninger, D. L.; Tri, T. O.; Packham, N. J.
1996-01-01
Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.
Rubbertown NGEM Demonstration Project Planning meetings, April 18-19, 2017
From the shared perspective of industrial facilities, workers, regulators, and communities, cost-effective detection and assessment of significant onset fugitive leaks or process issues, is a mutually beneficial concept. If emissions that require mitigation can be detected and f...
15 CFR 2301.17 - Evaluation criteria for construction and planning applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PUBLIC TELECOMMUNICATIONS FACILITIES PROGRAM Evaluation and Selection Process § 2301.17 Evaluation... significant diversity in the ownership of, operation of, and participation in public telecommunications... attitudes of diverse listeners by promoting the development of more effective programming strategies...
30 CFR 254.3 - May I cover more than one facility in my response plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I cover more than one facility in my... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.3 May I cover more than one facility in my response plan? (a) Your response plan may be for a...
Automated survey of 8000 plan checks at eight facilities.
Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph
2016-09-01
To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.
Hynol Process Engineering: Process Configuration, Site Plan, and Equipment Design
1996-02-01
feed stock. Compared with other methanol production processes, direct emissions of carbon dioxide can be substantially reduced by using the Hynol...A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the ...Hynol process. The plant is being designed to convert 50 lb./hr of biomass to methanol. The biomass consists of wood, and natural gas is used as a co
Facilities Planning Conference for Community-Junior College State-Level Personnel.
ERIC Educational Resources Information Center
Florida Univ., Gainesville. Inst. of Higher Education.
This report on planning and developing facilities for community-junior colleges includes papers presented at a conference for state-level facility planners. The meeting covered the following areas: (1) development of physical facilities responsive to educational programs and community needs; (2) efficient use of existing facilities through…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Cul, G.D.; Osborne, P.E.; Beck, D.E.
1991-01-01
The Paducah Gaseous Diffusion Plant (PGDP) C-400 Decontamination Facility generates aqueous solutions that originate in drum washing, machine parts and equipment cleaning, and other decontamination processes. The chemical composition of the waste depends on the particular operation involved. In general, the waste contains uranyl, fluoride, carbonate, and nitrate ions, plus soaps, detergents, secondary contaminants, and particulate matter. The uranium content is rather variable ranging between 0.5 and 30 g/l. The main contaminants are fluoride, technetium, uranium, and other heavy metals. The plan included (1) a literature search to support best available technology (BAT) evaluation of treatment alternatives, (2) a qualitymore » assurance/quality control plan, (3) suggestion of alternative treatment options, (4) bench-scale tests studies of the proposed treatment alternatives, and (5) establishment of the final recommendation. The following report records the evaluation of items (1) to (3) of the action plan for the BAT evaluation of alternatives for the treatment and retreatment of uranium-contaminated wastewater at the PGDP C-400 treatment facility. After a thorough literature search, five major technologies were considered: (1) precipitation/coprecipitation, (2) reverse osmosis, (3) ultrafiltration, (4) supported liquid membranes, and (5) ion exchange. Biosorption was also considered, but as it is a fairly new technology with few demonstrations of its capabilities, it is mentioned only briefly in the report. Based on C-400's requirements and facilities, the precipitation/coprecipitation process appears to be the best suited for use at the plant. Four different treatment options using the precipitation/coprecipitation technology are proposed. Bench-scale studies of the four options are suggested. 37 refs.« less
Planning and scheduling lessons learned study, executive summary
NASA Technical Reports Server (NTRS)
Robinson, Toni
1990-01-01
The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.
ERIC Educational Resources Information Center
Adams, Matt
2002-01-01
Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary Mecham; Don Konoyer
2009-11-01
The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the reroutingmore » and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these facilities. This information will document conditions at time of transfer of the facilities from Nuclear Energy to Environmental Management and serve as the basis for disposition planning. The process used in obtaining this information included document searches, interviews and facility walk-downs. A copy of the facility walk-down checklist is included in this report as Appendix A. MFC-799/799A/770C are all structurally sound and associated hazardous or potentially hazardous conditions are well defined and well understood. All installed equipment items (tanks, filters, etc.) used to process hazardous materials remain in place and appear to have maintained their integrity. There is no evidence of leakage and all openings are properly sealed or closed off and connections are sound. The pits appear clean with no evidence of cracking or deterioration that could lead to migration of contamination. Based upon the available information/documentation reviewed and the overall conditions observed during the facilities walk-down, it is concluded that these facilities may be disposed of at minimal risk to human health, safety or the environment.« less
A Guide for Planning Indoor Facilities for College Physical Education.
ERIC Educational Resources Information Center
Crawford, Wayne H.
Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…
Planning and Managing School Facilities. Second Edition.
ERIC Educational Resources Information Center
Kowalski, Theodore J.
This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…
School Building Designs: Principles and Challenges of the 21st Century.
ERIC Educational Resources Information Center
Chan, T. C.
2002-01-01
Reviews school-facility challenges and design principles described in 2000 U.S. Department of Education report on school planning and design. Describes additional school-facility design challenges and planning principles. Describes five critical facility-planning issues for the 21st Century. (Contains 14 references.) (PKP)
Planning Physical Education and Athletic Facilities in Schools.
ERIC Educational Resources Information Center
Penman, Kenneth A.
This book is primarily designed for a course in planning physical education and athletic facilities and as a supplementary textbook for administration courses. It illustrates the skills necessary for designing and planning facilities, stresses the need for effective communication between planners and users, and covers elementary through college…
LIQUID EFFLUENT RETENTION FACILITY (LERF) BASIN 42 STUDIES
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB
2004-10-29
This report documents laboratory results obtained under test plan RPP-21533 for samples submitted by the Effluent Treatment Facility (ETF) from the Liquid Effluent Retention Facility (LERF) Basin 42 (Reference 1). The LERF Basin 42 contains process condensate (PC) from the 242-A Evaporator and landfill leachate. The ETF processes one PC campaign approximately every 12 to 18 months. A typical PC campaign volume can range from 1.5 to 2.5 million gallons. During the September 2003 ETF Basin 42 processing campaign, a recurring problem with 'gelatinous buildup' on the outlet filters from 60A-TK-I (surge tank) was observed (Figure 1). This buildup appearedmore » on the filters after the contents of the surge tank were adjusted to a pH of between 5 and 6 using sulfuric acid. Biological activity in the PC feed was suspected to be the cause of the gelatinous material. Due to this buildup, the filters (10 {micro}m CUNO) required daily change out to maintain process throughput.« less
The challenge of logistics facilities development
NASA Technical Reports Server (NTRS)
Davis, James R.
1987-01-01
The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.
Using of New Management Approaches in the Field of Personal Marketing in the Transport Company
NASA Astrophysics Data System (ADS)
Matusova, Dominika; Gogolova, Martina
2017-10-01
Personal marketing is a relatively new field in the theory and practice of human resources (HR) activities in the corporate and business sector. As a separate area of HR management was established of the earmarking of personnel management. In the article is mentioned about the facility manager. This position introduces a specific category - behaviour of manager. The facility manager has to dispose the skills from the areas: operation and maintenance, property, facility management processes, human factors of environment, planning, function devices, finance and quality management and innovation and communication. In the article is described the situation in transport company, specifically - Railway Company Slovakia, Inc. (ZSSK). Employees of the company works in departments as: managers, sellers, operators for services and maintenance, economists and controllers. The transport company had 5949 employees in 2015. That was about 108 employees more than the previous year. Facility manager and the company, set the targets which want to achieve within the planned time. Beyond the objectives are fundamental the values of company, business vision and mission.
Renovating existing space to meet special needs for outpatient paediatric oncology.
Rhodes, D A
1999-01-01
Many existing hospital buildings are inadequate to meet needs caused by a tremendous shift from inpatient to outpatient care. Expensive diagnostic and treatment facilities must still be shared by inpatients and outpatients, which in many cases makes renovations to existing facilities on site more appealing than new free-standing facilities; However, care must be taken in the planning and design to make sure that existing hospital operations can be maintained throughout this work. St. Jude Children's Research Hospital in Memphis, an internationally acclaimed institution devoted to the research and treatment of catastrophic illnesses in children has experienced a large growth in its outpatients' care due mainly to changes in treatment modalities and the development of more effective cures. The result has been an extreme overcrowding and unpleasant experiences for patient and family due to awkward patient flow and work processes attempting to respond to the inadequate facility conditions. This paper will not only review the planning issues, but will discuss the renovation which will require several phases in order to minimise disruption to the ongoing activities.
Integration of Biosafety into Core Facility Management
Fontes, Benjamin
2013-01-01
This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.
Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Hacker, Scott
2012-01-01
The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.
LANDSAT D data processing facility study
NASA Technical Reports Server (NTRS)
1976-01-01
Mission planning of the LANDSAT D is discussed which will present several major advances in the spacecraft, sensor (Thematic Mapper), ground systems and overall system design. The system provides for two data links-direct satellite to ground, and via the Tracking and Data Relay Satellite.
PROCESS DESIGN MANUAL FOR SLUDGE TREATMENT AND DISPOSAL
The purpose of this manual is to provide the engineering community and related industry with a new source of information to be used in the planning, design, and operation of present and future wastewater pollution control facilities. This manual supplements this existing knowledg...
40 CFR 52.1770 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Particulates from Mica or Feldspar Processing Plants 04/01/03 09/17/03, 68 FR 54362 Sect .0510 Particulates..., approving Paragraph (g) excluding the following language: “excluding startups, shutdowns, maintenance... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
40 CFR 52.1770 - Identification of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... .0509 Particulates from Mica or Feldspar Processing Plants 04/01/03 09/17/03, 68 FR 54362 Sect .0510... Paragraph (g). Also, approving Paragraph (g) excluding the following language: “excluding startups... production facilities producing ethanol by natural fermentation under the North American Industry...
40 CFR 52.1770 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Particulates from Mica or Feldspar Processing Plants 04/01/03 09/17/03, 68 FR 54362 Sect .0510 Particulates..., approving Paragraph (g) excluding the following language: “excluding startups, shutdowns, maintenance... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
Pace slows in northern Rockies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, K.
1984-03-01
This paper deals with recent natural gas development and production in the northern Rocky Mountain region. Because of restricted gas markets, the pace has slowed construction of gas processing and gathering facilities. The gas and oil companies which are planning or building new projects are discussed.
100-D Ponds closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, S.W.
1997-09-01
The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Lepoire, D; Richmond, P; Cheng, J-J; Kamboj, S; Arnish, J; Chen, S Y; Barr, C; McKenney, C
2008-08-01
As part of the requirement for terminating the licenses of nuclear power plants or other nuclear facilities, license termination plans or decommissioning plans are submitted by the licensee to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. Decommissioning plans generally refer to the decommissioning of nonreactor facilities, while license termination plans specifically refer to the decommissioning of nuclear reactor facilities. To provide a uniform and consistent review of dose modeling aspects of these plans and to address NRC-wide knowledge management issues, the NRC, in 2006, commissioned Argonne National Laboratory to develop a Web-based training course on reviewing radiological dose assessments for license termination. The course, which had first been developed in 2005 to target specific aspects of the review processes for license termination plans and decommissioning plans, evolved from a live classroom course into a Web-based training course in 2006. The objective of the Web-based training course is to train NRC staff members (who have various relevant job functions and are located at headquarters, regional offices, and site locations) to conduct an effective review of dose modeling in accordance with the latest NRC guidance, including NUREG-1757, Volumes 1 and 2. The exact size of the staff population who will receive the training has not yet been accurately determined but will depend on various factors such as the decommissioning activities at the NRC. This Web-based training course is designed to give NRC staff members modern, flexible access to training. To this end, the course is divided into 16 modules: 9 core modules that deal with basic topics, and 7 advanced modules that deal with complex issues or job-specific topics. The core and advanced modules are tailored to various NRC staff members with different job functions. The Web-based system uses the commercially available software Articulate, which incorporates audio, video, and animation in slide presentations and has glossary, document search, and Internet connectivity features. The training course has been implemented on an NRC system that allows staff members to register, select courses, track records, and self-administer quizzes.
The Oak Ridge Refrigerant Management Program
NASA Technical Reports Server (NTRS)
Kevil, Thomas H.
1995-01-01
For many years, chlorofluorocarbons (CFC's) have been used by the Department of Energy's (DOE) Oak Ridge Y-12 Plant in air conditioning and process refrigeration systems. However, Title 6 of the Clean Air Act Amendments (CAAA) and Executive Order 12843 (Procurement Requirements and Policies for Federal Agencies for Ozone Depleting Substances) signed by President Clinton require, as policy, that all federal agencies maximize their use of safe, alternate refrigerants and minimize, where economically practical, the use of Class 1 refrigerants. Unfortunately, many government facilities and industrial plants have no plan or strategy in place to make this changeover, even though their air conditioning and process refrigeration equipment may not be sustainable after CFC production ends December 31, 1995. The Y-12 Plant in Oak Ridge, Tennessee, has taken an aggressive approach to complying with the CAAA and is working with private industry and other government agencies to solve tough manufacturing and application problems associated with CFC and hydrochlorofluorocarbon (HCFC) alternatives. Y-12 was the first DOE Defense Program (DP) facility to develop a long-range Stratospheric Ozone Protection Plan for refrigerant management for compliance with the CAAA. It was also the first DOE DP facility to complete detailed engineering studies on retrofitting and replacing all air conditioning and process refrigeration equipment to enable operation with alternate refrigerants. The management plan and engineering studies are models for use by other government agencies, manufacturing plants, and private industry. This presentation identifies some of the hidden pitfalls to be encountered in the accelerated phaseout schedule of CFC's and explains how to overcome and prevent these problems. In addition, it outlines the general issues that must be considered when addressing the phase-out of ozone depleting substances and gives some 'lessons learned' by Y-12 from its Refrigerant Management Program. Discussion topics include requirements for developing a refrigerant management plan and establishing priorities for cost-effective compliance with the CAAA, as well as ways in which employees can be empowered to develop a comprehensive refrigerant management plan. The result of this employee empowerment was a cooperative labor-management effort that is beneficial for Y-12, DOE, and the environment.
Kennedy Space Center Florida Scrub-Jay Compensation Plan
NASA Technical Reports Server (NTRS)
Pitcock, Taylor Morgan (Compiler)
2014-01-01
Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.
Resource Allocation Planning Helper (RALPH): Lessons learned
NASA Technical Reports Server (NTRS)
Durham, Ralph; Reilly, Norman B.; Springer, Joe B.
1990-01-01
The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
Radioactive Waste Management and Nuclear Facility Decommissioning Progress in Iraq - 13216
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Musawi, Fouad; Shamsaldin, Emad S.; Jasim, Hadi
2013-07-01
Management of Iraq's radioactive wastes and decommissioning of Iraq's former nuclear facilities are the responsibility of Iraq's Ministry of Science and Technology (MoST). The majority of Iraq's former nuclear facilities are in the Al-Tuwaitha Nuclear Research Center located a few kilometers from the edge of Baghdad. These facilities include bombed and partially destroyed research reactors, a fuel fabrication facility and radioisotope production facilities. Within these facilities are large numbers of silos, approximately 30 process or waste storage tanks and thousands of drums of uncharacterised radioactive waste. There are also former nuclear facilities/sites that are outside of Al-Tuwaitha and these includemore » the former uranium processing and waste storage facility at Jesira, the dump site near Adaya, the former centrifuge facility at Rashdiya and the former enrichment plant at Tarmiya. In 2005, Iraq lacked the infrastructure needed to decommission its nuclear facilities and manage its radioactive wastes. The lack of infrastructure included: (1) the lack of an organization responsible for decommissioning and radioactive waste management, (2) the lack of a storage facility for radioactive wastes, (3) the lack of professionals with experience in decommissioning and modern waste management practices, (4) the lack of laws and regulations governing decommissioning or radioactive waste management, (5) ongoing security concerns, and (6) limited availability of electricity and internet. Since its creation eight years ago, the MoST has worked with the international community and developed an organizational structure, trained staff, and made great progress in managing radioactive wastes and decommissioning Iraq's former nuclear facilities. This progress has been made, despite the very difficult implementing conditions in Iraq. Within MoST, the Radioactive Waste Treatment and Management Directorate (RWTMD) is responsible for waste management and the Iraqi Decommissioning Directorate (IDD) is responsible for decommissioning activities. The IDD and the RWTMD work together on decommissioning projects. The IDD has developed plans and has completed decommissioning of the GeoPilot Facility in Baghdad and the Active Metallurgical Testing Laboratory (LAMA) in Al-Tuwaitha. Given this experience, the IDD has initiated work on more dangerous facilities. Plans are being developed to characterize, decontaminate and decommission the Tamuz II Research Reactor. The Tammuz Reactor was destroyed by an Israeli air-strike in 1981 and the Tammuz II Reactor was destroyed during the First Gulf War in 1991. In addition to being responsible for managing the decommissioning wastes, the RWTMD is responsible for more than 950 disused sealed radioactive sources, contaminated debris from the first Gulf War and (approximately 900 tons) of naturally-occurring radioactive materials wastes from oil production in Iraq. The RWTMD has trained staff, rehabilitated the Building 39 Radioactive Waste Storage building, rehabilitated portions of the French-built Radioactive Waste Treatment Station, organized and secured thousands of drums of radioactive waste organized and secured the stores of disused sealed radioactive sources. Currently, the IDD and the RWTMD are finalizing plans for the decommissioning of the Tammuz II Research Reactor. (authors)« less
Sire: An Automated Software Development Environment.
1983-12-01
understanding the fundamental nature of the software process" (Osterweil, 1981: 35). In fact, the optimal environment for most applications is found by extending... resource planning and other management concerns that cause these problems. Therefore, a complete ASDE should attempt to provide the -21...management with some type of control over the project without impeding the actual development process. Facilities that estimate current resource
ERIC Educational Resources Information Center
Ducote, Kenneth J.
A study by the United States General Accounting Office found that successful organizations incorporate in their capital budgeting process extensive links between planning and budgeting, up-to-date information on existing capital facilities, and consideration of long-term effects in making capital budgeting decisions. This paper recommends the…
Castles in the Sand: Why School Overcrowding Remains a Problems in NYC
ERIC Educational Resources Information Center
Connell, Noreen; Widerquist, Karl; Arnold, Sarah; Opresiu, Alma
2002-01-01
The elimination of student overcrowding--the objective in writing this report and the objective in seeking reforms of the school facilities construction process--must be the top priority for the city in the next decade. The premise of this report is that much of the planning process for building and repairing schools requires fundamental change,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
PK-12 Public Educational Facilities Master Plan Evaluation Guide
ERIC Educational Resources Information Center
21st Century School Fund, 2011
2011-01-01
Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…
Sport Facility Planning and Management. Sport Management Library.
ERIC Educational Resources Information Center
Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.
Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…
77 FR 73060 - Standard Review Plan for Review of Fuel Cycle Facility License Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility... for a fuel cycle facility (NUREG-1520) provides NRC staff guidance for reviewing and evaluating the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
..., 72, et al. Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 and Amendments to Material Control and Accounting Regulations; Proposed Rules #0;#0... Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 AGENCY...
Tessema, Gizachew Assefa; Streak Gomersall, Judith; Mahmood, Mohammad Afzal; Laurence, Caroline O.
2016-01-01
Background Improving use of family planning services is key to improving maternal health in Africa, and provision of quality of care in family planning services is critical to support higher levels of contraceptive uptake. The objective of this systematic review was to synthesize the available evidence on factors determining the quality of care in family planning services in Africa. Methods Quantitative and qualitative studies undertaken in Africa, published in English, in grey and commercial literature, between 1990 and 2015 were considered. Methodological quality of included studies was assessed using standardized tools. Findings from the quantitative studies were summarized using narrative and tables. Client satisfaction was used to assess the quality of care in family planning services in the quantitative component of the review. Meta-aggregation was used to synthesize the qualitative study findings. Results From 4334 records, 11 studies (eight quantitative, three qualitative) met the review eligibility criteria. The review found that quality of care was influenced by client, provider and facility factors, and structural and process aspects of the facilities. Client’s waiting time, provider competency, provision/prescription of injectable methods, maintaining privacy and confidentiality were the most commonly identified process factors. The quality of stock inventory was the most commonly identified structural factor. The quality of care was also positively associated with privately-owned facilities. The qualitative synthesis revealed additional factors including access related factors such as ‘pre-requisites to be fulfilled by the clients and cost of services, provider workload, and providers’ behaviour. Conclusion There is limited evidence on factors determining quality of care in family planning services in Africa that shows quality of care is influenced by multiple factors. The evidence suggests that lowering access barriers and avoiding unnecessary pre-requisites for taking contraceptive methods are important to improve the quality of care in family planning services. Strategies to improve provider behavior and competency are important. Moreover, strategies that minimize client waiting time and ensure client confidentiality should be implemented to ensure quality of care in family planning services. However, no strong evidence based conclusions and recommendations may be drawn from the evidence. Future studies are needed to identify the most important factors associated with quality of care in family planning services in a wider range of African countries. PMID:27812124
DOE Office of Scientific and Technical Information (OSTI.GOV)
Usui, Hideo; Izumo, Sari; Tachibana, Mitsuo
Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management datamore » such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)« less
NASA Astrophysics Data System (ADS)
Meertens, C. M.; Boler, F. M.; Ertz, D. J.; Mencin, D.; Phillips, D.; Baker, S.
2017-12-01
UNAVCO, in its role as a NSF facility for geodetic infrastructure and data, has succeeded for over two decades using on-premises infrastructure, and while the promise of cloud-based infrastructure is well-established, significant questions about suitability of such infrastructure for facility-scale services remain. Primarily through the GeoSciCloud award from NSF EarthCube, UNAVCO is investigating the costs, advantages, and disadvantages of providing its geodetic data and services in the cloud versus using UNAVCO's on-premises infrastructure. (IRIS is a collaborator on the project and is performing its own suite of investigations). In contrast to the 2-3 year time scale for the research cycle, the time scale of operation and planning for NSF facilities is for a minimum of five years and for some services extends to a decade or more. Planning for on-premises infrastructure is deliberate, and migrations typically take months to years to fully implement. Migrations to a cloud environment can only go forward with similar deliberate planning and understanding of all costs and benefits. The EarthCube GeoSciCloud project is intended to address the uncertainties of facility-level operations in the cloud. Investigations are being performed in a commercial cloud environment (Amazon AWS) during the first year of the project and in a private cloud environment (NSF XSEDE resource at the Texas Advanced Computing Center) during the second year. These investigations are expected to illuminate the potential as well as the limitations of running facility scale production services in the cloud. The work includes running parallel equivalent cloud-based services to on premises services and includes: data serving via ftp from a large data store, operation of a metadata database, production scale processing of multiple months of geodetic data, web services delivery of quality checked data and products, large-scale compute services for event post-processing, and serving real time data from a network of 700-plus GPS stations. The evaluation is based on a suite of metrics that we have developed to elucidate the effectiveness of cloud-based services in price, performance, and management. Services are currently running in AWS and evaluation is underway.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Dan P.; Woodham, Wesley H.; Williams, Matthew S.
Testing was completed to develop a chemical processing flowsheet for the Defense Waste Processing Facility (DWPF), designed to vitrify and stabilize high level radioactive waste. DWPF processing uses a reducing acid (formic acid) and an oxidizing acid (nitric acid) to rheologically thin the slurry and complete the necessary acid base and reduction reactions (primarily mercury and manganese). Formic acid reduces mercuric oxide to elemental mercury, allowing the mercury to be removed during the boiling phase of processing through steam stripping. In runs with active catalysts, formic acid can decompose to hydrogen and nitrate can be reduced to ammonia, both flammablemore » gases, due to rhodium and ruthenium catalysis. Replacement of formic acid with glycolic acid eliminates the generation of rhodium- and ruthenium-catalyzed hydrogen and ammonia. In addition, mercury reduction is still effective with glycolic acid. Hydrogen, ammonia and mercury are discussed in the body of the report. Ten abbreviated tests were completed to develop the operating window for implementation of the flowsheet and determine the impact of changes in acid stoichiometry and the blend of nitric and glycolic acid as it impacts various processing variables over a wide processing region. Three full-length 4-L lab-scale simulations demonstrated the viability of the flowsheet under planned operating conditions. The flowsheet is planned for implementation in early 2017.« less
Previsani, Nicoletta; Tangermann, Rudolph H; Tallis, Graham; Jafari, Hamid S
2015-08-28
In 1988, the World Health Assembly of the World Health Organization (WHO) resolved to eradicate polio worldwide. Among the three wild poliovirus (WPV) types (type 1, type 2, and type 3), WPV type 2 (WPV2) has been eliminated in the wild since 1999, and WPV type 3 (WPV3) has not been reported since 2012. In 2015, only Afghanistan and Pakistan have reported WPV transmission. On May 25, 2015, all WHO Member States endorsed World Health Assembly resolution 68.3 on full implementation of the Polio Eradication and Endgame Strategic Plan 2013-2018 (the Endgame Plan), and with it, the third Global Action Plan to minimize poliovirus facility-associated risk (GAPIII). All WHO Member States have committed to implementing appropriate containment of WPV2 in essential laboratory and vaccine production facilities* by the end of 2015 and of type 2 oral poliovirus vaccine (OPV2) within 3 months of global withdrawal of OPV2, which is planned for April 2016. This report summarizes critical steps for essential laboratory and vaccine production facilities that intend to retain materials confirmed to contain or potentially containing type-specific WPV, vaccine-derived poliovirus (VDPV), or OPV/Sabin viruses, and steps for nonessential facilities† that process specimens that contain or might contain polioviruses. National authorities will need to certify that the essential facilities they host meet the containment requirements described in GAPIII. After certification of WPV eradication, the use of all OPV will cease; final containment of all polioviruses after polio eradication and OPV cessation will minimize the risk for reintroduction of poliovirus into a polio-free world.
Mpunga, Dieudonné; Lumbayi, J P; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert
2017-06-27
To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as "high" if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or "low" if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services ( P <.001). Public facilities were less likely than private facilities to have high-quality services ( P =.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. © Mpunga et al.
Facilities maintenance handbook
NASA Technical Reports Server (NTRS)
1991-01-01
This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.
33 CFR 154.1030 - General response plan contents.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...
33 CFR 154.1030 - General response plan contents.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...
33 CFR 154.1030 - General response plan contents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...
33 CFR 154.1030 - General response plan contents.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...
33 CFR 154.1030 - General response plan contents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...
25 CFR 170.401 - What is BIA's role in transportation planning?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...
ERIC Educational Resources Information Center
Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.
It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…
Los Medanos College Fact Book.
ERIC Educational Resources Information Center
MacDonald, Ross; And Others
Prepared to support the self-study and strategic planning processes at Los Medanos College (LMC), in Pittsburgh, California, this fact book offers information about LMC's students, staff, programs, services, facilities, and expenditures. The first section focuses on the student population, including a trend analysis and longitudinal data on…
77 FR 38051 - EPA Activities To Promote Environmental Justice in the Permit Application Process
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... (EPA). In 2011, EPA published Plan EJ 2014, the Agency's overarching strategy for advancing... robust community engagement strategies that recognize the value of community outreach. Pursuant to these strategies, facilities engage actively with the community through environmental initiatives, neighborhood...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... controlling oxides of nitrogen from the stationary reciprocating, diesel fuel fired, internal combustion... County. The facility contains two stationary reciprocating, diesel fuel fired, internal combustion... Conditions of Approval specify the NO X emissions limits, combustion process adjustments mentioned above...
Preliminary fuel use results from gin audits
USDA-ARS?s Scientific Manuscript database
Interest in improving sustainability in cotton production and processing has focused attention on fuel use by cotton gins for seed cotton drying. Audits are planned for multiple gin facilities over a diverse geography to establish baseline fuel usage and drying system efficiencies to reveal opportu...
Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.
Johnson, Doug; Ugaz, Jorge
2016-09-01
We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality. © 2016 The Population Council, Inc.
Nie, Xianghui; Huang, Guo H; Li, Yongping
2009-11-01
This study integrates the concepts of interval numbers and fuzzy sets into optimization analysis by dynamic programming as a means of accounting for system uncertainty. The developed interval fuzzy robust dynamic programming (IFRDP) model improves upon previous interval dynamic programming methods. It allows highly uncertain information to be effectively communicated into the optimization process through introducing the concept of fuzzy boundary interval and providing an interval-parameter fuzzy robust programming method for an embedded linear programming problem. Consequently, robustness of the optimization process and solution can be enhanced. The modeling approach is applied to a hypothetical problem for the planning of waste-flow allocation and treatment/disposal facility expansion within a municipal solid waste (MSW) management system. Interval solutions for capacity expansion of waste management facilities and relevant waste-flow allocation are generated and interpreted to provide useful decision alternatives. The results indicate that robust and useful solutions can be obtained, and the proposed IFRDP approach is applicable to practical problems that are associated with highly complex and uncertain information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weaver, Phyllis C.
The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort wasmore » designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The process for D&D and final dismantlement of facilities requires that the known contaminants of concern (COCs) be evaluated and quantified and to identify and quantify any additional contaminants in order to satisfy the waste acceptance criteria requirements for the desired disposal pathway. Known facility contaminants include, but are not limited to, asbestos-containing material (ACM), radiological contaminants, and chemical contaminants including polychlorinated biphenyls (PCBs) and metals.« less
The used nuclear fuel problem - can reprocessing and consolidated storage be complementary?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, C.; Thomas, I.
2013-07-01
This paper describes our CISF (Consolidated Interim Storage Facilities) and Reprocessing Facility concepts and show how they can be combined with a geologic repository to provide a comprehensive system for dealing with spent fuels in the USA. The performance of the CISF was logistically analyzed under six operational scenarios. A 3-stage plan has been developed to establish the CISF. Stage 1: the construction at the CISF site of only a rail receipt interface and storage pad large enough for the number of casks that will be received. The construction of the CISF Canister Handling Facility, the Storage Cask Fabrication Facility,more » the Cask Maintenance Facility and supporting infrastructure are performed during stage 2. The construction and placement into operation of a water-filled pool repackaging facility is completed for Stage 3. By using this staged approach, the capital cost of the CISF is spread over a number of years. It also allows more time for a final decision on the geologic repository to be made. A recycling facility will be built, this facility will used the NUEX recycling process that is based on the aqueous-based PUREX solvent extraction process, using a solvent of tri-N-butyl phosphate in a kerosene diluent. It is capable of processing spent fuels at a rate of 5 MT per day, at burn-ups up to 50 GWD per ton of spent fuels and a minimum of 5 years out-of-reactor cooling.« less
An Environmental Audit Management Plan for the Royal Australian Air Force
1992-09-01
the auditors and the management of this facility at the exit meeting. SA A UO D SO NA 16. Audit report was unduly concerned with trivia . SA A UO 0 SO NA...Welfare Facilities - rubbish, putrescible matter and animal wastes. 12. Swimming Pool - filter backwash. 13. Base Recycling Centre - check for any...concerned with trivia : SA A UD D SD NA 13. The audit report was useful to base management: SA A UD D SD NA 14. The audit process was effective and of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichols, Will E.; Mehta, Sunil
The updated Hanford Site Composite Analysis will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at Hanford following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management (DOE, 2001), related to managing low-level waste disposal facilities at the Hanford Site.
Space Station services and design features for users
NASA Technical Reports Server (NTRS)
Kurzhals, Peter R.; Mckinney, Royce L.
1987-01-01
The operational design features and services planned for the NASA Space Station will furnish, in addition to novel opportunities and facilities, lower costs through interface standardization and automation and faster access by means of computer-aided integration and control processes. By furnishing a basis for large-scale space exploitation, the Space Station will possess industrial production and operational services capabilities that may be used by the private sector for commercial ventures; it could also ultimately support lunar and planetary exploration spacecraft assembly and launch facilities.
Science Facilities for Mississippi Schools, Grades 1-12.
ERIC Educational Resources Information Center
Mississippi State Dept. of Education, Jackson. Div. of Instruction.
Prepared to assist those planning the construction of new science facilities on the elementary, intermediate, or secondary school level. Standards are outlined and specifications detailed. A statement of fifteen general pricniples for planning science facilities in secondary schools precedes a discussion of--(1) special facilities for different…
Planning Requirements for Small School Facilities.
ERIC Educational Resources Information Center
Davis, J. Clark; McQueen, Robert
The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
.... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...
40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...
40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...
40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...
40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...
40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...
ERIC Educational Resources Information Center
Rexhausen, Jeff
The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…
33 CFR 154.1220 - Response plan submission requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...
33 CFR 154.1220 - Response plan submission requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...
Draft Site Treatment Plan (DSTP), Volumes I and II
DOE Office of Scientific and Technical Information (OSTI.GOV)
D`Amelio, J.
1994-08-30
Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilitiesmore » is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.« less
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
High Power MPD Thruster Development at the NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
LaPointe, Michael R.; Mikellides, Pavlos G.; Reddy, Dhanireddy (Technical Monitor)
2001-01-01
Propulsion requirements for large platform orbit raising, cargo and piloted planetary missions, and robotic deep space exploration have rekindled interest in the development and deployment of high power electromagnetic thrusters. Magnetoplasmadynamic (MPD) thrusters can effectively process megawatts of power over a broad range of specific impulse values to meet these diverse in-space propulsion requirements. As NASA's lead center for electric propulsion, the Glenn Research Center has established an MW-class pulsed thruster test facility and is refurbishing a high-power steady-state facility to design, build, and test efficient gas-fed MPD thrusters. A complimentary numerical modeling effort based on the robust MACH2 code provides a well-balanced program of numerical analysis and experimental validation leading to improved high power MPD thruster performance. This paper reviews the current and planned experimental facilities and numerical modeling capabilities at the Glenn Research Center and outlines program plans for the development of new, efficient high power MPD thrusters.
Modernizing an ambulatory care pharmacy in a large multi-clinic institution.
Miller, R F; Herrick, J D
1979-03-01
The steps involved in modernizing an outdated outpatient pharmacy, including the functional planning process, development of a work-flow pattern which makes the patient an integral part of the system, budget considerations and evaluation of the new pharmacy, are described. Objectives of the modernization were to: (1) provide a facility conductive to efficient and high quality services to the ambulatory patient; (2) provide an attractive and comfortable area for patients and staff; (3) provide a work flow which keeps the patient in the system and allows the pharmacist time for instruction and patient education; and (4) establish a patient medication record system. After one year of operation, average overall prescription volume increased by 50%, while average waiting time declined by 74%. Facility and procedural changes allowed the pharmacist to substantially increase patient counseling activity. The application of functional planning and facility design to the renovation and restructuring of an outpatient pharmacy allowed pharmacists to provide efficient, patient-oriented service.
School Nutrition Facility Planning Guide.
ERIC Educational Resources Information Center
Pannell, Dorothy VanEgmond
This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…
Hospital capacity planning: from measuring stocks to modelling flows
Wright, Stephen; Barlow, James; McKee, Martin
2010-01-01
Abstract The metric of “bed numbers” is commonly used in hospital planning, but it fails to capture key aspects of how hospital services are delivered. Drawing on a study of innovative hospital projects in Europe, we argue that hospital capacity planning should not be based on beds, but rather on the ability to deliver processes. We propose using approaches that are based on manufacturing theory such as “lean thinking” that focuses on the value that different processes add for the primary customer, i.e. the patient. We argue that it is beneficial to look at the hospital, not from the perspective of beds or specialties, but rather from the path taken by the patients who are treated in them, the respective processes delivered by health professionals and the facilities appropriate to those processes. Systematized care pathways seem to offer one avenue for achieving these goals. However, they need to be underpinned by a better understanding of the flows of patients, work and goods within a hospital, the bottlenecks that occur, and translation of this understanding into new capacity planning tools. PMID:20680129
Onshore planning for offshore oil: lessons from Scotland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baldwin, P.L.; Baldwin, M.F.
1975-01-01
This book examines the physical, social, and economic effects onshore that accompany oil development offshore, namely: (1) the phases of oil development--exploration, platform construction, supply base development, pipeline construction, drilling, processing, and transportation--each of which generates its own impacts in its own time frame; many of the impacts are felt surprisingly early; (2) the strains placed on planning systems as the unforeseen magnitude of oil discoveries, the speed of development, and the need for onshore support facilities can overwhelm local planning capacity; (3) the experience of the sparsely populated Shetland Islands, where the County Council succeeded in pushing special legislationmore » throug Parliament to ''Shetlandize'' oil facilities within its boundaries and limit them to a single location; (4) the transformation of the once sleepy fishing village of Peterhead (pop. 14,500) and its fine natural harbor into a major supply base, with a power plant, pipeline landings, storage tanks, and processing plants planned for nearby; and (5) the growth of Aberdeen, formerly a university and fishing city, into the ''Houston of the North,'' with direct flights to and from Texas and high-heeled boots and Stetson hats displayed in store windows. Finally, the authors relate the Scottish experience directly to the U.S. with specific policy recommendations to permit coastal areas about to undergo an oil boom to take advantage of the lessons the Scots have learned--in many cases, the hard way.« less
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2012 CFR
2012-07-01
... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...
42 CFR 37.4 - Plans for chest roentgenographic examinations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... covered by the plan; (4) The name and location of the approved X-ray facility or facilities, and the... approval as the originally approved plan. (e) The operator must promptly display in a visible location on... NIOSH. The proposed plan or change in plan must remain posted in a visible location on the bulletin...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; Commonwealth of Virginia... Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION... request for EPA withdrawal of its section 111(d)/129 plan (the plan) approval for HMIWI units. Submittal...
Decadal Vision Progress Report Implementation Plans and Status for the Next Generation ARM Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mather, James
The reconfiguration of the ARM facility, formally initiated in early 2014, is geared toward implementing the Next Generation of the ARM Facility, which will more tightly link ARM measurements and atmospheric models. The strategy is outlined in the ARM Climate Research Facility Decadal Vision (DOE 2014a). The strategy includes the implementation of a high-resolution model, initially at the Southern Great Plains (SGP) site, and enhancements at the SGP and North Slope of Alaska (NSA) sites to provide additional observations to support modeling and process studies. Enhancements at the SGP site focus on ground-based instruments while enhancements at the NSA makemore » use of Unmanned Aerial Systems (UAS) and Tethered Balloon Systems (TBS). It is also recognized that new data tools and data products will need to be developed to take full advantage of these improvements. This document provides an update on the status of these ARM facility enhancements, beginning with the measurement enhancements at the SGP and NSA, followed by a discussion of the modeling project including associated data-processing activities.« less
Appendix E - Sample Production Facility Plan
This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
40 CFR 372.25 - Thresholds for reporting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS TOXIC CHEMICAL RELEASE REPORTING: COMMUNITY RIGHT-TO-KNOW... threshold amounts for purposes of reporting under § 372.30 for toxic chemicals are as follows: (a) With respect to a toxic chemical manufactured (including imported) or processed at a facility during the...
40 CFR 372.25 - Thresholds for reporting.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS TOXIC CHEMICAL RELEASE REPORTING: COMMUNITY RIGHT-TO-KNOW... threshold amounts for purposes of reporting under § 372.30 for toxic chemicals are as follows: (a) With respect to a toxic chemical manufactured (including imported) or processed at a facility during the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... for Cotton Gins AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is... regulation related to minor NSR preconstruction permitting for particulate matter emissions from cotton ginning facilities. The submitted Cotton Gin regulation provides an alternative preconstruction process...
2010-11-01
metal. Recovery extraction centrifugal contactors A process that uses solvent to extract uranium for purposes of purification. Agile machining A...extraction centrifugal contactors 5 6 Yes 6 No Agile machining 5 5 No 6 No Chip management 5 6 Yes 6 No Special casting 3 6 Yes 6 No Source: GAO
AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned
2010-07-01
Area 1-30A explosive facility and provide consultation/support during the review process for each of the site plans. • Applied Engineering Services...provided consultation/support during the siting review process. • Applied Engineering Services (AES) Inc. performed a detailed structural, blast, thermal... Applied Engineering Services (AES) Inc. structural, blast, thermal and fragment hazard analysis to determine the appropriate siting values based on
MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiCostanzo, D; Woollard, J; Gupta, N
2015-06-15
Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactionsmore » with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication between all parties involved in the TP process increasing patient safety.« less
Strategic workforce planning for a multihospital, integrated delivery system.
Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience
2012-01-01
Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.
Process wastewater treatability study for Westinghouse fluidized-bed coal gasification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Winton, S.L.; Buvinger, B.J.; Evans, J.M.
1983-11-01
In the development of a synthetic fuels facility, water usage and wastewater treatment are major areas of concern. Coal gasification processes generally produce relatively large volumes of gas condensates. These wastewaters are typically composed of a variety of suspended and dissolved organic and inorganic solids and dissolved gaseous contaminants. Fluidized-bed coal gasification (FBG) processes are no exception to this rule. The Department of Energy's Morgantown Energy Technology Center (METC), the Gas Research Institute (GRI), and the Environmental Protection Agency (EPA/IERLRTP) recognized the need for a FBG treatment program to provide process design data for FBG wastewaters during the environmental, health,more » and safety characterization of the Westinghouse Process Development Unit (PDU). In response to this need, METC developed conceptual designs and a program plan to obtain process design and performance data for treating wastewater from commercial-scale Westinghouse-based synfuels plants. As a result of this plan, METC, GRI, and EPA entered into a joint program to develop performance data, design parameters, conceptual designs, and cost estimates for treating wastewaters from a FBG plant. Wastewater from the Westinghouse PDU consists of process quench and gas cooling condensates which are similar to those produced by other FBG processes such as U-Gas, and entrained-bed gasification processes such as Texaco. Therefore, wastewater from this facility was selected as the basis for this study. This paper outlines the current program for developing process design and cost data for the treatment of these wastewaters.« less
Network Performance Evaluation Model for assessing the impacts of high-occupancy vehicle facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janson, B.N.; Zozaya-Gorostiza, C.; Southworth, F.
1986-09-01
A model to assess the impacts of major high-occupancy vehicle (HOV) facilities on regional levels of energy consumption and vehicle air pollution emissions in urban aeas is developed and applied. This model can be used to forecast and compare the impacts of alternative HOV facility design and operation plans on traffic patterns, travel costs, model choice, travel demand, energy consumption and vehicle emissions. The model is designed to show differences in the overall impacts of alternative HOV facility types, locations and operation plans rather than to serve as a tool for detailed engineering design and traffic planning studies. The Networkmore » Performance Evaluation Model (NETPEM) combines several urban transportation planning models within a multi-modal network equilibrium framework including modules with which to define the type, location and use policy of the HOV facility to be tested, and to assess the impacts of this facility.« less
Santella, Nicholas; Steinberg, Laura J; Sengul, Hatice
2010-04-01
Hurricane Katrina struck an area dense with industry, causing numerous releases of petroleum and hazardous materials. This study integrates information from a number of sources to describe the frequency, causes, and effects of these releases in order to inform analysis of risk from future hurricanes. Over 200 onshore releases of hazardous chemicals, petroleum, or natural gas were reported. Storm surge was responsible for the majority of petroleum releases and failure of storage tanks was the most common mechanism of release. Of the smaller number of hazardous chemical releases reported, many were associated with flaring from plant startup, shutdown, or process upset. In areas impacted by storm surge, 10% of the facilities within the Risk Management Plan (RMP) and Toxic Release Inventory (TRI) databases and 28% of SIC 1311 facilities experienced accidental releases. In areas subject only to hurricane strength winds, a lower fraction (1% of RMP and TRI and 10% of SIC 1311 facilities) experienced a release while 1% of all facility types reported a release in areas that experienced tropical storm strength winds. Of industrial facilities surveyed, more experienced indirect disruptions such as displacement of workers, loss of electricity and communication systems, and difficulty acquiring supplies and contractors for operations or reconstruction (55%), than experienced releases. To reduce the risk of hazardous material releases and speed the return to normal operations under these difficult conditions, greater attention should be devoted to risk-based facility design and improved prevention and response planning.
Optimization-based decision support to assist in logistics planning for hospital evacuations.
Glick, Roger; Bish, Douglas R; Agca, Esra
2013-01-01
The evacuation of the hospital is a very complex process and evacuation planning is an important part of a hospital's emergency management plan. There are numerous factors that affect the evacuation plan including the nature of threat, availability of resources and staff the characteristics of the evacuee population, and risk to patients and staff. The safety and health of patients is of fundamental importance, but safely moving patients to alternative care facilities while under threat is a very challenging task. This article describes the logistical issues and complexities involved in planning and execution of hospital evacuations. Furthermore, this article provides examples of how optimization-based decision support tools can help evacuation planners to better plan for complex evacuations by providing real-world solutions to various evacuation scenarios.
Appendix D - Sample Bulk Storage Facility Plan
This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-17
... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...
Code of Federal Regulations, 2011 CFR
2011-07-01
... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Spill response plans for facilities located in...
NASA Technical Reports Server (NTRS)
Madden, Michael G.; Wyrick, Roberta; O'Neill, Dale E.
2005-01-01
Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.
Complete Report on the Development of Welding Parameters for Irradiated Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frederick, Greg; Sutton, Benjamin J.; Tatman, Jonathan K.
The advanced welding facility at the Radiochemical Engineering Development Center of Oak Ridge National Laboratory, which was conceived to enable research and development of weld repair techniques for nuclear power plant life extension, is now operational. The development of the facility and its advanced welding capabilities, along with the model materials for initial welding trials, were funded jointly by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability Program, the Electric Power Research Institute, Long Term Operations Program and the Welding and Repair Technology Center, with additional support from Oak Ridge National Laboratory. Welding of irradiatedmore » materials was initiated on November 17, 2017, which marked a significant step in the development of the facility and the beginning of extensive welding research and development campaigns on irradiated materials that will eventually produce validated techniques and guidelines for weld repair activities carried out to extend the operational lifetimes of nuclear power plants beyond 60 years. This report summarizes the final steps that were required to complete weld process development, initial irradiated materials welding activities, near-term plans for irradiated materials welding, and plans for post-weld analyses that will be carried out to assess the ability of the advanced welding processes to make repairs on irradiated materials.« less
Questionnaire survey on the process of specialty training in neurology in Japan.
Sonoo, Masahiro; Nishiyama, Kazutoshi; Ando, Tetsuo; Shindo, Katsuro; Kanda, Takashi; Aoki, Masashi; Kamei, Satoshi; Kikuchi, Seiji; Kusunoki, Susumu; Suzuki, Norihiro; Sobue, Gen; Nakashima, Kenji; Hara, Hideo; Hirata, Koichi; Mizusawa, Hidehiro; Murai, Hiroyuki; Murata, Miho; Mochizuki, Hideki; Takahashi, Ryosuke; Kira, Jun-Ichi
2017-07-29
Documentation of the current status of specialty training to become a neurologist in Japan would represent an important basis for constructing better neurology training program in the planned reform of the specialty training system in Japan. The committee for future neurology specialty system of Japanese Society of Neurology (JSN) conducted a questionnaire survey on the process of specialty training of each trainee for neurology in board-certified educational facilities and semi-educational facilities throughout Japan. The response rate was 46.2% in all facilities and 87.5% in medical universities. The training process of 905 trainees over 5 grades was clarified, which was estimated to be about 80% of all the relevant subjects. Specialty training dedicated to neurology was started at the 3rd year of residency in 87.8% of subjects. During the 3 years following junior residency, 51.3% of subjects ran the rotation training between university and city hospital, whereas 36.5% was trained within the same institution throughout the 3 years of training period.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
... include new and existing small-scale wind energy facilities, such as single-turbine demonstration projects, as well as large, multi-turbine commercial wind facilities. Covered Species The planning partners are...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...
ERIC Educational Resources Information Center
Zucker, Charles B.
The utility of a particular citizen participation planning approach as applied to educational facilities planning is described. With the aid of a clear-cut decisionmaking procedure, citizens could participate effectively in the development of specific planning policy statements. Such statements could be used to discuss planning priorities, focus…
Web-based system for surgical planning and simulation
NASA Astrophysics Data System (ADS)
Eldeib, Ayman M.; Ahmed, Mohamed N.; Farag, Aly A.; Sites, C. B.
1998-10-01
The growing scientific knowledge and rapid progress in medical imaging techniques has led to an increasing demand for better and more efficient methods of remote access to high-performance computer facilities. This paper introduces a web-based telemedicine project that provides interactive tools for surgical simulation and planning. The presented approach makes use of client-server architecture based on new internet technology where clients use an ordinary web browser to view, send, receive and manipulate patients' medical records while the server uses the supercomputer facility to generate online semi-automatic segmentation, 3D visualization, surgical simulation/planning and neuroendoscopic procedures navigation. The supercomputer (SGI ONYX 1000) is located at the Computer Vision and Image Processing Lab, University of Louisville, Kentucky. This system is under development in cooperation with the Department of Neurological Surgery, Alliant Health Systems, Louisville, Kentucky. The server is connected via a network to the Picture Archiving and Communication System at Alliant Health Systems through a DICOM standard interface that enables authorized clients to access patients' images from different medical modalities.
Mpunga, Dieudonné; Lumbayi, JP; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert
2017-01-01
Objective: To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Methods: Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as “high” if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or “low” if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. Results: We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services (P<.001). Public facilities were less likely than private facilities to have high-quality services (P=.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Conclusion: Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. PMID:28588047
Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torres, Juan; Anderson, Art
The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less
30 CFR 285.640 - What is a General Activities Plan (GAP)?
Code of Federal Regulations, 2010 CFR
2010-07-01
... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... conceptual decommissioning plans for all planned facilities, including testing of technology devices and... easements for the assessment and development of your limited lease or grant. (b) You must receive MMS...
33 CFR 154.1060 - Submission and approval procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...
33 CFR 154.1060 - Submission and approval procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...
33 CFR 154.1060 - Submission and approval procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...
33 CFR 154.1060 - Submission and approval procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...
33 CFR 154.1060 - Submission and approval procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... promulgated on May 10, 2006. Connecticut DEEP's State Plan is for implementing and enforcing provisions at... and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut; 111(d)/129 Revised State Plan for Large and Small Municipal Waste Combustors AGENCY: Environmental Protection Agency...
Northrop TRIGA facility decommissioning plan versus actual results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gardner, F.W.
1986-01-01
This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.
1998-09-28
Seen from behind, the orbiter Atlantis approaches the entrance of Orbiter Processing Facility 2 (OPF-2) where it will undergo preparations for its planned flight in June 1999. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. OPF-2 consists of a 2,700-square-meter (29,000 square ft.) high bay. The building measures 29 meters (95 ft). high, 121 meters (397 ft.) long and 71 meters (233 ft.) wide
1998-09-28
Seen from behind, the orbiter Atlantis moves into the Orbiter Processing Facility 2 (OPF-2) where it will undergo preparations for its planned flight in June 1999. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. OPF-2 consists of two 2,700-square-meter (29,000 square feet) high bays. It measures 29 meters (95 ft). high, 121 meters (397 ft) long and 71 meters (233 ft) wide
Developing a Comprehensive Housing Strategy: A Case Study
ERIC Educational Resources Information Center
Marsters, Tim; Bliss, Kelly
2007-01-01
In the current highly competitive higher education market in North America, many colleges have identified the importance of upgrading their existing residential housing facilities as part of their strategy to attract and retain students. The case study discussed in this article describes the successful planning process used by Perkins+Will and…
ERIC Educational Resources Information Center
Kennedy, Mike
2006-01-01
In the beginning, optimism reigns. As planning for a new education facility gets underway, those with a stake in the process envision how the building will enhance the institution and the surrounding area. Teachers and students imagine spacious, comfortable classrooms and labs with the most up-to-date equipment and furniture. Administrators and…