Sample records for facility project appendix

  1. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  2. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  3. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  4. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  5. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  6. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  7. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  8. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  9. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  10. 29 CFR 1918.97 - First aid and lifesaving facilities. (See appendix V of this part).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false First aid and lifesaving facilities. (See appendix V of... LONGSHORING General Working Conditions. § 1918.97 First aid and lifesaving facilities. (See appendix V of this... injury, regardless of severity, to the employer. (b) First aid. A first aid kit shall be available at or...

  11. 33 CFR Appendix A to Part 105 - Facility Vulnerability and Security Measures Summary (Form CG-6025)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Facility Vulnerability and Security Measures Summary (Form CG-6025) A Appendix A to Part 105 Navigation and Navigable Waters COAST... Appendix A to Part 105—Facility Vulnerability and Security Measures Summary (Form CG-6025) ER22OC03.000...

  12. 49 CFR Appendix E to Part 599 - Disposal Facility Certification Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Disposal Facility Certification Form E Appendix E to Part 599 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Facility Certification Form ER05AU09.020 ER05AU09.021 ER05AU09.022 [74 FR 38976, Aug. 5, 2009] ...

  13. 49 CFR Appendix A to Part 37 - Modifications to Standards for Accessible Transportation Facilities

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Facilities A Appendix A to Part 37 Transportation Office of the Secretary of Transportation...—Modifications to Standards for Accessible Transportation Facilities The Department of Transportation, in § 37.9 of this part, adopts as its regulatory standards for accessible transportation facilities the revised...

  14. Weightless Environment Training Facility (WETF) materials coating evaluation, volume 3

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This volume consists of Appendices C, D, E, and F to the report on the Weightless Environment Training Facility Materials Coating Evaluation project. The project selected 10 coating systems to be evaluated in six separate exposure environments, and subject to three tests for physical properties. Appendix C is the photographic appendix of the test panels. Appendix D details methods and procedures. Appendix E lists application equipment costs. Appendix F is a compilation of the solicitation of the candidate coating systems.

  15. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  16. 7 CFR Appendix C to Subpart E of... - Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... beverage purposes, is manufactured from biomass. (2) The alcohol production facility includes all... Production Facilities C Appendix C to Subpart E of Part 1980 Agriculture Regulations of the Department of...—Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities (1) Alcohol production facility. An...

  17. 7 CFR Appendix C to Subpart E of... - Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... beverage purposes, is manufactured from biomass. (2) The alcohol production facility includes all... Production Facilities C Appendix C to Subpart E of Part 1980 Agriculture Regulations of the Department of...—Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities (1) Alcohol production facility. An...

  18. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  19. 7 CFR Appendix C to Subpart E of... - Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 14 2012-01-01 2012-01-01 false Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities C Appendix C to Subpart E of Part 1980 Agriculture Regulations of the Department of... Business and Industrial Loan Program Pt. 1980, Subpt. E, App. C Appendix C to Subpart E of Part 1980...

  20. 7 CFR Appendix C to Subpart E of... - Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 14 2011-01-01 2011-01-01 false Guidelines for Loan Guarantees for Alcohol Fuel Production Facilities C Appendix C to Subpart E of Part 1980 Agriculture Regulations of the Department of... Business and Industrial Loan Program Pt. 1980, Subpt. E, App. C Appendix C to Subpart E of Part 1980...

  1. Weightless Environment Training Facility (WETF) materials coating evaluation, volume 2

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This volume consists of Appendices A and B to the report on the Weightless Environment Training Facility Materials Coating Evaluation project. The project selected 10 coating systems to be evaluated in six separate exposure environments, and subject to three tests for physical properties. Appendix A holds the coating system, surface preparation, and application data. Appendix B holds the coating material infrared spectra.

  2. 33 CFR Appendix A to Part 263 - History of Program and Project Limitations Continuing Authorities Program

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false History of Program and Project Limitations Continuing Authorities Program A Appendix A to Part 263 Navigation and Navigable Waters CORPS OF... Appendix A to Part 263—History of Program and Project Limitations Continuing Authorities Program Section...

  3. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  4. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) GENERAL Business and Industrial Loan Program Pt. 1980, Subpt. E, App. D Appendix D to Subpart E... designed utilizing accepted engineering practices and are conformed to applicable Federal, State and local... this appendix. (II) Technical Services. (A) The borrower is responsible for selecting engineering...

  5. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  6. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  7. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  8. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  9. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  10. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  11. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  12. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  13. 16 CFR Appendix F to Part 436 - Sample Item 20(5) Table-Projected New Franchised Outlets

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Sample Item 20(5) Table-Projected New Franchised Outlets F Appendix F to Part 436 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES DISCLOSURE REQUIREMENTS AND PROHIBITIONS CONCERNING FRANCHISING Pt. 436, App. F Appendix F to Part...

  14. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  15. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  16. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  17. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  18. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  19. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  20. Campania Region's Educational Quality Facilities Project

    ERIC Educational Resources Information Center

    Ponti, Giorgio

    2009-01-01

    This article describes the Educational Quality Facilities project undertaken by Italy's Campania Region to provide quality facilities to all of its communities basing new spaces on the "Flexible Learning Module". The objectives of the five-year project are to: build and equip new educational spaces; improve the quality of existing…

  1. 33 CFR Appendix A to Part 263 - History of Program and Project Limitations Continuing Authorities Program

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Pt. 263, App. A Appendix A to Part 263—History of Program and Project Limitations Continuing Authorities Program Section... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false History of Program and Project...

  2. 33 CFR Appendix A to Part 263 - History of Program and Project Limitations Continuing Authorities Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Pt. 263, App. A Appendix A to Part 263—History of Program and Project Limitations Continuing Authorities Program Section... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false History of Program and Project...

  3. 33 CFR Appendix A to Part 263 - History of Program and Project Limitations Continuing Authorities Program

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Pt. 263, App. A Appendix A to Part 263—History of Program and Project Limitations Continuing Authorities Program Section... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false History of Program and Project...

  4. 33 CFR Appendix A to Part 263 - History of Program and Project Limitations Continuing Authorities Program

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Pt. 263, App. A Appendix A to Part 263—History of Program and Project Limitations Continuing Authorities Program Section... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false History of Program and Project...

  5. 18 CFR Appendix A to Part 2 - Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL...

  6. Chemical facility vulnerability assessment project.

    PubMed

    Jaeger, Calvin D

    2003-11-14

    Sandia National Laboratories, under the direction of the Office of Science and Technology, National Institute of Justice, conducted the chemical facility vulnerability assessment (CFVA) project. The primary objective of this project was to develop, test and validate a vulnerability assessment methodology (VAM) for determining the security of chemical facilities against terrorist or criminal attacks (VAM-CF). The project also included a report to the Department of Justice for Congress that in addition to describing the VAM-CF also addressed general observations related to security practices, threats and risks at chemical facilities and chemical transport. In the development of the VAM-CF Sandia leveraged the experience gained from the use and development of VAs in other areas and the input from the chemical industry and Federal agencies. The VAM-CF is a systematic, risk-based approach where risk is a function of the severity of consequences of an undesired event, the attack potential, and the likelihood of adversary success in causing the undesired event. For the purpose of the VAM-CF analyses Risk is a function of S, L(A), and L(AS), where S is the severity of consequence of an event, L(A) is the attack potential and L(AS) likelihood of adversary success in causing a catastrophic event. The VAM-CF consists of 13 basic steps. It involves an initial screening step, which helps to identify and prioritize facilities for further analysis. This step is similar to the prioritization approach developed by the American Chemistry Council (ACC). Other steps help to determine the components of the risk equation and ultimately the risk. The VAM-CF process involves identifying the hazardous chemicals and processes at a chemical facility. It helps chemical facilities to focus their attention on the most critical areas. The VAM-CF is not a quantitative analysis but, rather, compares relative security risks. If the risks are deemed too high, recommendations are developed for

  7. 15 CFR Appendix B to Subpart R of... - Minor Projects for Purposes of § 922.193(a)(2)(iii)

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....193(a)(2)(iii) B Appendix B to Subpart R of Part 922 Commerce and Foreign Trade Regulations Relating... Thunder Bay National Marine Sanctuary and Underwater Preserve Pt. 922, Subpt. R, App. B Appendix B to Subpart R of Part 922—Minor Projects for Purposes of § 922.193(a)(2)(iii) Pursuant to Michigan State...

  8. 15 CFR Appendix B to Subpart R of... - Minor Projects for Purposes of § 922.193(a)(2)(iii)

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....193(a)(2)(iii) B Appendix B to Subpart R of Part 922 Commerce and Foreign Trade Regulations Relating... Thunder Bay National Marine Sanctuary and Underwater Preserve Pt. 922, Subpt. R, App. B Appendix B to Subpart R of Part 922—Minor Projects for Purposes of § 922.193(a)(2)(iii) Pursuant to Michigan State...

  9. 15 CFR Appendix B to Subpart R of... - Minor Projects for Purposes of § 922.193(a)(2)(iii)

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....193(a)(2)(iii) B Appendix B to Subpart R of Part 922 Commerce and Foreign Trade Regulations Relating... Thunder Bay National Marine Sanctuary and Underwater Preserve Pt. 922, Subpt. R, App. B Appendix B to Subpart R of Part 922—Minor Projects for Purposes of § 922.193(a)(2)(iii) Pursuant to Michigan State...

  10. The South African isotope facility project

    NASA Astrophysics Data System (ADS)

    Bark, R. A.; Barnard, A. H.; Conradie, J. L.; de Villiers, J. G.; van Schalkwyk, P. A.

    2018-05-01

    The South African Isotope Facility (SAIF) is a project in which iThemba LABS plans to build a radioactive-ion beam (RIB) facility. The project is divided into the Accelerator Centre of Exotic Isotopes (ACE Isotopes) and the Accelerator Centre for Exotic Beams (ACE Beams). For ACE Isotopes, a high-current, 70 MeV cyclotron will be acquired to take radionuclide production off the existing Separated Sector Cyclotron (SSC). A freed up SSC will then be available for an increased tempo of nuclear physics research and to serve as a driver accelerator for the ACE Beams project, in which protons will be used for the direct fission of Uranium, producing beams of fission fragments. The ACE Beams project has begun with "LeRIB" - a Low Energy RIB facility, now under construction. In a collaboration with INFN Legnaro, the target/ion-source "front-end" will be a copy of the front-end developed for the SPES project. A variety of targets may be inserted into the SPES front-end; a uranium-carbide target has been designed to produce up to 2 × 1013 fission/s using a 70 MeV proton beam of 150 µA intensity.

  11. 10 CFR Appendix L to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] L Appendix L to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix L to Part 50 [Reserved] ...

  12. 10 CFR Appendix P to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] P Appendix P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix P to Part 50 [Reserved] ...

  13. 10 CFR Appendix D to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] D Appendix D to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix D to Part 50 [Reserved] ...

  14. 10 CFR Appendix M to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] M Appendix M to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix M to Part 50 [Reserved] ...

  15. 10 CFR Appendix O to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] O Appendix O to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix O to Part 50 [Reserved] ...

  16. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  17. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  18. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  19. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  20. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  1. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  2. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  3. Local/State Bilingual Project. 1981-82 Final Technical Report. Appendixes.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    The 1981-82 Local/State Bilingual Program Technical Report addresses the evaluation questions of the Local/State Bilingual Program Evaluation Design. It is organized into six appendixes. Each appendix reports the information collected by a specific measure. Each appendix consists of (1) an instrument description, (2) purpose of the measure, (3)…

  4. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  5. 10 CFR Appendixes O-P to Part 50 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...

  6. 10 CFR Appendixes O-P to Part 50 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...

  7. 10 CFR Appendixes O-P to Part 50 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...

  8. 10 CFR Appendixes O-P to Part 50 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...

  9. 10 CFR Appendixes L-M to Part 50 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false [Reserved] L Appendixes L-M to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes L-M to Part 50 [Reserved] ...

  10. Space infrared telescope facility project

    NASA Technical Reports Server (NTRS)

    Cruikshank, Dale P.

    1988-01-01

    The functions undertaken during this reporting period were: to inform the planetary science community of the progress and status of the Space Infrared Telescope Facility (SIRTF) Project; to solicit input from the planetary science community on needs and requirements of planetary science in the use of SIRTF at such time that it becomes an operational facility; and a white paper was prepared on the use of the SIRTF for solar system studies.

  11. Heritage Park Facilities PV Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobaica, Mark

    Project Objective: To procure a photovoltaic array (PV) system which will generate approximately 256kW of power to be used for the operations of the Aquatic Complex and the adjacent Senior Facility at the Heritage Park. This project complies with the EERE’s work and objectives by promoting the development and deployment of an energy system that will provide current and future generations with clean, efficient, affordable, and reliable energy.

  12. Concentrating Solar Power Projects - National Solar Thermal Power Facility

    Science.gov Websites

    | Concentrating Solar Power | NREL National Solar Thermal Power Facility Status Date: February 13, 2014 Project Overview Project Name: National Solar Thermal Power Facility Country: India Location Capacity (Net): 1.0 MW Output Type: Steam Rankine Thermal Storage Storage Type: None

  13. Report on Collaborative Facilities Projects.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    California's community colleges develop their own requests in concert with their district five-year master plan. They then submit those requests to the State Chancellor's Office for review. This document discusses the current process of submitting proposals for collaborative facilities projects, and outlines and discusses five recommendations for…

  14. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  15. Appendix F - Sample Contingency Plan

    EPA Pesticide Factsheets

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  16. 40 CFR Appendix IV to Part 266 - Reference Air Concentrations*

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Reference Air Concentrations* IV Appendix IV to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Pt. 266, App. IV Appendix IV to Part 266—Reference Air Concentrations* Constituent CAS...

  17. 40 CFR Appendix IV to Part 266 - Reference Air Concentrations*

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Reference Air Concentrations* IV Appendix IV to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Pt. 266, App. IV Appendix IV to Part 266—Reference Air Concentrations* Constituent CAS...

  18. 40 CFR Appendix IV to Part 266 - Reference Air Concentrations*

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Reference Air Concentrations* IV Appendix IV to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Pt. 266, App. IV Appendix IV to Part 266—Reference Air Concentrations* Constituent CAS...

  19. 40 CFR Appendix IV to Part 266 - Reference Air Concentrations*

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Reference Air Concentrations* IV Appendix IV to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Pt. 266, App. IV Appendix IV to Part 266—Reference Air Concentrations* Constituent CAS...

  20. 40 CFR Appendix Vi to Part 266 - Stack Plume Rise

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Stack Plume Rise VI Appendix VI to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... FACILITIES Pt. 266, App. VI Appendix VI to Part 266—Stack Plume Rise [Estimated Plume Rise (in Meters) Based...

  1. 40 CFR Appendix Vi to Part 266 - Stack Plume Rise

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Stack Plume Rise VI Appendix VI to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... FACILITIES Pt. 266, App. VI Appendix VI to Part 266—Stack Plume Rise [Estimated Plume Rise (in Meters) Based...

  2. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  3. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  4. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  5. 36 CFR Appendix C to Part 1191 - Architectural Barriers Act: Scoping

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Architectural Barriers Act: Scoping C Appendix C to Part 1191 Parks, Forests, and Public Property ARCHITECTURAL AND TRANSPORTATION... FACILITIES; ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY GUIDELINES Pt. 1191, App. C Appendix C to Part...

  6. 36 CFR Appendix C to Part 1191 - Architectural Barriers Act: Scoping

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Architectural Barriers Act: Scoping C Appendix C to Part 1191 Parks, Forests, and Public Property ARCHITECTURAL AND TRANSPORTATION... FACILITIES; ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY GUIDELINES Pt. 1191, App. C Appendix C to Part...

  7. 36 CFR Appendix C to Part 1191 - Architectural Barriers Act: Scoping

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Architectural Barriers Act: Scoping C Appendix C to Part 1191 Parks, Forests, and Public Property ARCHITECTURAL AND TRANSPORTATION... FACILITIES; ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY GUIDELINES Pt. 1191, App. C Appendix C to Part...

  8. National Biomedical Tracer Facility: Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heaton, R.; Peterson, E.; Smith, P.

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPFmore » to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.« less

  9. 7 CFR Appendix A to Subpart E of... - Hazard Potential Classification for Civil Works Projects

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... essential facilities and access Disruption of critical facilities and access. Property Losses 4 Private..., communications, power supply, etc. 4 Direct economic impact of value of property damages to project facilities and down stream property and indirect economic impact due to loss of project services, i.e., impact on...

  10. Congressional hearing reviews NSF major research and facilities projects

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  11. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  12. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  13. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  14. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  15. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  16. 2 CFR Appendix B to Part 230 - Selected Items of Cost

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PRINCIPLES FOR NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-122) Pt. 230, App. B Appendix B to Part 230—Selected... use of patents and copyrights 45. Selling and marketing 46. Specialized service facilities 47. Taxes... of this appendix provide principles to be applied in establishing the allowability of certain items...

  17. School Facility Projects in Latin America

    ERIC Educational Resources Information Center

    Berk, Jeffrey; de Cassia Alves Vaz, Rita; Honorio, Joao; Baza, Jadille; Origel, Ricardo; Gomez, Fredys

    2004-01-01

    Many Latin American countries are undertaking projects, in line with practices disseminated by PEB, to share school facilities with the local community, to adapt traditional schools for students with disabilities, and to collaborate with private companies to finance educational buildings. The articles below describe current initiatives in five…

  18. Mathematical Problem Solving Project Technical Report III: Module Development and Formative Evaluation. Appendix B - "Organizing Lists" Quizzes and Data.

    ERIC Educational Resources Information Center

    Indiana Univ., Bloomington. Mathematics Education Development Center.

    This appendix to the Mathematical Problem Solving Project "Module Development and Formative Evaluation" contains trials 1 and 2 of the Organizing Lists quiz. Editorial feedback from teachers on the Organizing Lists booklet is given for trials 1 and 2. Editorial feedback from teachers on the Organizing Lists problem deck is given for…

  19. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 8, Appendix B (contd)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  20. Energy Engineering Analysis Program, energy survey of Army Industrial Facilities, Western Area Demilitarization Facility Hawthorne Ermy Ammunition Plant Hawthorne, Nevada. Volume 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-17

    This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA03-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status, are listed in Table 1 - 1. The complete scope of work appears in Appendix.« less

  1. VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    CONRAD, M.J.; VALENTINE, I.E.

    IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…

  2. 36 CFR Appendix B to Part 1191 - Americans With Disabilities Act: Scoping

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Act: Scoping B Appendix B to Part 1191 Parks, Forests, and Public Property ARCHITECTURAL AND... BUILDINGS AND FACILITIES; ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY GUIDELINES Pt. 1191, App. B Appendix B to Part 1191—Americans With Disabilities Act: Scoping ER23JY04.004 ER23JY04.005 ER23JY04.006...

  3. 6 CFR Appendix A to Part 27 - DHS Chemicals of Interest

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false DHS Chemicals of Interest A Appendix A to Part 27 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Pt. 27, App. A Appendix A to Part 27—DHS Chemicals of Interest ER20NO07.008 ER20NO07.009...

  4. 6 CFR Appendix A to Part 27 - DHS Chemicals of Interest

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false DHS Chemicals of Interest A Appendix A to Part 27 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Pt. 27, App. A Appendix A to Part 27—DHS Chemicals of Interest ER20NO07.008 ER20NO07.009...

  5. 6 CFR Appendix A to Part 27 - DHS Chemicals of Interest

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false DHS Chemicals of Interest A Appendix A to Part 27 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Pt. 27, App. A Appendix A to Part 27—DHS Chemicals of Interest ER20NO07.008 ER20NO07.009...

  6. 6 CFR Appendix A to Part 27 - DHS Chemicals of Interest

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false DHS Chemicals of Interest A Appendix A to Part 27 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Pt. 27, App. A Appendix A to Part 27—DHS Chemicals of Interest ER20NO07.008 ER20NO07.009...

  7. 6 CFR Appendix A to Part 27 - DHS Chemicals of Interest

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false DHS Chemicals of Interest A Appendix A to Part 27 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Pt. 27, App. A Appendix A to Part 27—DHS Chemicals of Interest ER20NO07.008 ER20NO07.009...

  8. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 4, Appendix A (contd)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  9. Advanced system demonstration for utilization of biomass as an energy source. Technical Appendix J: alternatives studies. Environmental report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCollom, M.

    1979-01-01

    A comprehensive review of a wide range of alternatives to the proposed action, the commercial demonstration of an industrial cogenerating facility fired with wood fuels is provided. An extensive effort has been devoted to the evaluation of all reasonable alternatives to this project. A number of possible actions were also briefly considered, but, for various reasons, they were found not to be appropriate at present for a commercial-scale demonstration of an alternative energy source. The critical characteristics of the wood-fueled commercial demonstration project at Westbrook are considered to be: industrial cogeneration of power; the production of 510,000 pounds per hourmore » of industrial process steam; the production of approximately twenty-five megawatts of electric generating capacity, some of which would be available to a public utility in southern Maine; and the consumption of 2,000 tons of wood fuel per day. Each of the alternatives examined in this appendix offers a different option for one or several of the characteristics of the project listed above. As a whole, the appendix describes the range of possible actions that the US Department of Energy and its contractors have considered.« less

  10. Ground-water monitoring compliance projects for Hanford Site facilities: Volume 1, The report and Appendix A, Progress report for the period October 1 to December 31, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report documents recent progress on ground-water monitoring projects for four Hanford Site facilities: the 300 Area Process Trenches, the 183-H Solar Evaporation Basins, the 200 Area Low-Level Burial Grounds, and the Nonradioactive Dangerous Waste (NRDW) Landfill. The existing ground-water monitoring projects for the first two facilities named in the paragraph above are currently being expanded by adding new wells to the networks. During the reporting period, sampling of the existing wells continued on a monthly basis, and the analytical results for samples collected from September through November 1986 are included and discussed in this document. 8 refs., 41 figs.,more » 7 tabs.« less

  11. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  12. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uraniummore » Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.« less

  13. Development of Army Facility Functionality Assessment Criteria and Procedures

    DTIC Science & Technology

    2010-09-01

    critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion

  14. Project Nuclotron-based Ion Collider fAcility at JINR

    NASA Astrophysics Data System (ADS)

    Kekelidze, V. D.; Matveev, V. A.; Meshkov, I. N.; Sorin, A. S.; Trubnikov, G. V.

    2017-09-01

    The project of Nuclotron-based Ion Collider fAcility (NICA) that is under development at JINR (Dubna) is presented. The general goals of the project are experimental studies of both hot and dense baryonic matter and spin physics (in collisions of polarized protons and deuterons). The first program requires providing of heavy ion collisions in the energy range of √ {{s_{NN}}} = 4-11 Gev at average luminosity of L = 1 × 1027 cm-2 s-1 for 197Au79+ nuclei. The polarized beams mode is proposed to be used in energy range of √ {{s_{NN}}} = 12-27 Gev (protons at luminosity of L ≥ 1 × 1030 cm-2 s-1. The report contains description of the facility scheme and its characteristics in heavy ion operation mode. The Collider will be equipped with two detectors—MultiPurpose Detector (MPD), which is in an active stage of construction, and Spin Physics Detector (SPD) that is in the stage of conceptual design. Fixed target experiment "Baryonic matter at Nuclotron" (BM@N) will be performed in very beginning of the project. The wide program of applied researches at NICA facility is being developed as well.

  15. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... technology and blast standards. Immediate review of ongoing projects may generate savings in the... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... all exterior windows (shatter protection) Recommended. Review current projects for blast standards...

  16. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction projects should be reviewed if possible, to incorporate current technology and blast standards... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... all exterior windows (shatter protection) Recommended. Review current projects for blast standards...

  17. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... technology and blast standards. Immediate review of ongoing projects may generate savings in the... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... all exterior windows (shatter protection) Recommended. Review current projects for blast standards...

  18. 34 CFR Appendix A to Part 379 - Evaluation Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Evaluation Standards A Appendix A to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. A Appendix A to Part 379...

  19. 34 CFR Appendix A to Part 379 - Evaluation Standards

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false Evaluation Standards A Appendix A to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. A Appendix A to Part 379...

  20. 34 CFR Appendix A to Part 379 - Evaluation Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true Evaluation Standards A Appendix A to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. A Appendix A to Part 379...

  1. 34 CFR Appendix A to Part 379 - Evaluation Standards

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false Evaluation Standards A Appendix A to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. A Appendix A to Part 379...

  2. 34 CFR Appendix A to Part 379 - Evaluation Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Evaluation Standards A Appendix A to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. A Appendix A to Part 379...

  3. Photovoltaic tests and applications project

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The activities and accomplishments of the Photovoltaic Tests and Applications Project during the period April 1976 through June 1977 are summarized. Results of efforts to identify potential near-term photovoltaic applications and users are discussed, including the outcome of an extensive survey of Federal government agencies. The status of application experiments is presented. Various general engineering efforts are reported, including the design and construction of a photovoltaic Systems Test Facility. Efforts to develop a high efficiency 10 kVA self-commutated inverter and controller specifically designed for photovoltaic systems are also discussed. The results of a wide variety of activities in the area of photovoltaic measurements and standards are related. Documents generated by the Project during the reporting period are listed in an Appendix.

  4. Overview of the NASA Dryden Flight Research Facility aeronautical flight projects

    NASA Technical Reports Server (NTRS)

    Meyer, Robert R., Jr.

    1992-01-01

    Several principal aerodynamics flight projects of the NASA Dryden Flight Research Facility are discussed. Key vehicle technology areas from a wide range of flight vehicles are highlighted. These areas include flight research data obtained for ground facility and computation correlation, applied research in areas not well suited to ground facilities (wind tunnels), and concept demonstration.

  5. 34 CFR Appendix B to Part 379 - Presumption of Eligibility

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true Presumption of Eligibility B Appendix B to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. B Appendix B...

  6. 34 CFR Appendix B to Part 379 - Presumption of Eligibility

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Presumption of Eligibility B Appendix B to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App. B Appendix B...

  7. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  8. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Plans D Appendix D to Part 154 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Pt. 154, App. D Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan...

  9. Optimal Facility Location Tool for Logistics Battle Command (LBC)

    DTIC Science & Technology

    2015-08-01

    64 Appendix B. VBA Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 Appendix C. Story...should city planners have located emergency service facilities so that all households (the demand) had equal access to coverage?” The critical...programming language called Visual Basic for Applications ( VBA ). CPLEX is a commercial solver for linear, integer, and mixed integer linear programming problems

  10. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  11. Financial Analysis of the Northeast Corridor Development Project : Volume 2. Appendixes E Through I.

    DOT National Transportation Integrated Search

    1976-11-01

    This appendix consists of two parts. The first part, Program Capability, contains a description of the capability of the program and is intended to bridge the gap between the descriptive material contained in Appendix D and the explanation of procedu...

  12. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less

  13. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  14. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  15. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  16. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  17. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Guidelines (see Appendix E to this part, section 13, for availability), which satisfy Oil Pollution Act (OPA... contracts with response contractors shall be included in this section so that the availability of resources...: ___ Direction from City: ___ Section: ____ Township: ____ Range: ____ Borough: ____ Container Type: ___ Tank Oil...

  18. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  19. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  20. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  1. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  2. 42 CFR Appendix to Subpart B of... - Required Consent Form

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Required Consent Form Appendix to Subpart B of Part 50 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects Pt. 50, Subpt. B, App. Appendix to Subpart B of Part 50...

  3. The Ohio School Facilities Commission. Revamping the State's School Construction Projects.

    ERIC Educational Resources Information Center

    De Patta, Joe

    2001-01-01

    Presents an interview with the Ohio School Facilities Commission's (OSFC) Executive Director who discusses the OSFC's history and its work in managing K-12 school facilities throughout the state. Topics include its efforts to help school districts get bond measures on ballets, funding projects, and its "Partnering Program" for construction…

  4. National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W J; Moses, E; Warner, B

    2000-12-07

    The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  5. Attentional Processes in Children's Learning. Appendix A: Project Papers.

    ERIC Educational Resources Information Center

    White, Sheldon H.

    This appendix includes seven papers which focus on various aspects of the learning processes of children ages 5-7: (1) S. Thompson, "Transitions to concrete operations: A survey of Piaget's writings" (in outline form); (2) S. H. White, "Changes in learning processes in the late preschool years," an examination of cross-cultural…

  6. Feasibility study on Thailand LNG project. Final report. Volume 2. Appendix. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This study, conducted by Bechtel, was funded by the U.S. Trade and Development Agency. The report specifically addresses an LNG terminal and associated gas pipeline, the crude oil pipeline component of the Southern Seaboard project, in addition to a power plant which uses a portion of the gas. Volume II contains the Appendix and is divided into the following sections: (1.0) PTT Data; (2.0) Design Criteria; (3.0) Khao Bo Ya Soils Data; (4.0) Khao Bo Ya Oceanographic Data; (5.0) Thailand Seismic Data; (6.0) Risk Assessment; (7.0) Equipment Lists; (8.0) Equipment Data Sheets; (9.0) Drawings; (10.0) Cost Data; (11.0) Calculations; (12.0)more » Terms of Reference.« less

  7. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  8. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  9. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  10. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  11. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  12. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Pt. 233, App. A Appendix A to Part 233... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  13. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Part 233, App. A Appendix A to Part 233—Model Notice [Date] [Name of foreign sender or foreign banking office] [Address] Re: U.S. Unlawful Internet Gambling... that your institution processed payments through our facilities for Internet gambling transactions...

  14. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE TREASURY PROHIBITION ON FUNDING OF UNLAWFUL INTERNET GAMBLING Pt. 132, App. A Appendix A to Part... Internet Gambling Enforcement Act Notice Dear [Name of foreign counterparty]: On [date], U.S. government officials informed us that your institution processed payments through our facilities for Internet gambling...

  15. 12 CFR Appendix A to Part 233 - Model Notice

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FUNDING OF UNLAWFUL INTERNET GAMBLING (REGULATION GG) Part 233, App. A Appendix A to Part 233—Model Notice [Date] [Name of foreign sender or foreign banking office] [Address] Re: U.S. Unlawful Internet Gambling... that your institution processed payments through our facilities for Internet gambling transactions...

  16. Annual Data Summary and Climatological Evaluation CERC (Coastal Engineering Research Center) Field Research Facility, 1985. Volume 1. Main Text and Appendixes A and B.

    DTIC Science & Technology

    1987-09-01

    AD-AI6 442 ANNUAL DATA SUMMARY AND CLINATOLOGICAL EVALUATION CEC I/ (COASTAL ENGINEERI.. (U) COASTAL ENGINEERING RESEARCH CENTER VICKSBURG NS H C ...MILLER ET RL. SEP 87 UNL ASSIF IED C RC-TR-87-i-L-1 F/0G/3 Mmsomommosmsss EmhhhmmmmmhEhEshhhhEhBhhE .EhI-EllhhlhhI mll/I/I l/I/u -1 I.I I ’ 22 I 1.8...SUMMARY AND ofEgier CLIMATOLOGICAL EVALUATION CERC FIELD RESEARCH FACILITY, 1985 NVolume I MAIN TEXT AND APPENDIXES A AND B, by ,, U Herman C . Miller

  17. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This documentmore » is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.« less

  18. Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455)

    DTIC Science & Technology

    2014-06-01

    TECHNICAL REPORT 2077 June 2014 Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455... Stormwater Discharges at Naval Facilities (NESDI Project 455) Final Report and Guidance C. Katz K. Sorensen E. Arias SSC Pacific R. Pitt L. Talebi...demonstration/validation project to assess the use of the urban stormwater model Windows Source Loading and Management Model (WinSLAMM) to characterize

  19. NAC Aftermarket Brake Components Project (Secondary Items)

    DTIC Science & Technology

    2007-02-06

    2. Appendix B. Test Plans and Sample Assignments for Disc Brake Pads and (Foundation) Drum Brake Shoes. 3. Appendix C. Test Plans and Sample...Assignments for Disc Brake Rotors and Drum Brake Drums . 4. Appendix D. Off-vehicle Inertia Dynamometer Test Procedures. 5. Appendix E. “Crack & Fatigue...apples” comparison testing processes, and require project outputs documents to be proofed by actual independent testing; HMMWV-ECV ( disc ) and HEMTT

  20. Environmental Projects. Volume 9: Construction of hazardous materials storage facilities

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.

  1. 14 CFR Appendix F to Part 121 - Proficiency Check Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... checks, and the selection of proper navigation and communications radio facilities and frequencies prior... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Proficiency Check Requirements F Appendix F to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  2. 14 CFR Appendix F to Part 121 - Proficiency Check Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... selection of proper navigation and communications radio facilities and frequencies prior to flight Except... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Proficiency Check Requirements F Appendix F to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  3. 14 CFR Appendix F to Part 121 - Proficiency Check Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... checks, and the selection of proper navigation and communications radio facilities and frequencies prior... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Proficiency Check Requirements F Appendix F to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  4. 14 CFR Appendix F to Part 121 - Proficiency Check Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... checks, and the selection of proper navigation and communications radio facilities and frequencies prior... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Proficiency Check Requirements F Appendix F to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  5. 14 CFR Appendix F to Part 121 - Proficiency Check Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... checks, and the selection of proper navigation and communications radio facilities and frequencies prior... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Proficiency Check Requirements F Appendix F to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  6. 31 CFR Appendix A to Part 132 - Model Notice

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERNET GAMBLING Pt. 132, App. A Appendix A to Part 132—Model Notice [Date] [Name of foreign sender or foreign banking office] [Address] Re: U.S. Unlawful Internet Gambling Enforcement Act Notice Dear [Name of... payments through our facilities for Internet gambling transactions restricted by U.S. law on [dates...

  7. 47 CFR Appendix - Technical Appendix 2

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM Waiver of household eligibility. Pt. 301, App. 2 Technical Appendix 2 TECHNICAL APPENDIX 2—NTIA... promotional prices Equipment cannot be sold conditioned on the purchase of a Smart Antenna or other equipment...

  8. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  9. 10 CFR Appendix C to Part 50 - A Guide for the Financial Data and Related Information Required To Establish Financial...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Required To Establish Financial Qualifications for Construction Permits and Combined Licenses C Appendix C... FACILITIES Pt. 50, App. C Appendix C to Part 50—A Guide for the Financial Data and Related Information... production plant costs $ (b) Transmission, distribution, and general plant costs $ (c) Nuclear fuel inventory...

  10. Evaluation of Nuclear Facility Decommissioning Projects program: a reference research reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baumann, B.L.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference research reactor (RRR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program.

  11. ITS component specification. Appendix A, Requirements per component

    DOT National Transportation Integrated Search

    1997-01-01

    The objective of the Polaris Project is to define an Intelligent Transportation Systems (ITS) architecture for the state of Minnesota. This appendix lists the requirements that have been allocated to each component. The requirements for each componen...

  12. The National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W.J.; Moses, E.; Warner, B.

    2000-12-07

    The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  13. Evaluation of a Dining Facility Intervention on U.S. Army Special Operations Soldiers’ Meal Quality, Dining Satisfaction, and Cost Effectiveness

    DTIC Science & Technology

    2016-11-18

    Eating Index (HEI) scores were computed. Descriptive and independent t-test analyses were performed pre to post HPP implementation ( =0.05; 80% power...Appendix B: HPP THOR3 Point-of-Service Label Examples ....................................... 77 Appendix C: Demographic & Lifestyle Survey ...78 Appendix D: Dining Facility Satisfaction Survey

  14. 100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HARRINGTON RA

    2010-01-15

    On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, tomore » all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project

  15. Appendix Y. The Integrated Communications Experiment (ICE) Summary.

    ERIC Educational Resources Information Center

    Coffin, Robert

    This appendix describes the Integrated Communications Experiment (ICE), a comprehensive computer software capability developed for the ComField Project. Each major characteristic of the data processing system is treated separately: natural language processing, flexibility, noninterference with the educational process, multipurposeness,…

  16. 32 CFR Appendix B to Part 513 - Standards of Fairness

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Standards of Fairness B Appendix B to Part 513 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND... overseas military banking facilities will be established by the Department of Defense. B-2. No contract or...

  17. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  18. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  19. The DE-PHARM Project: A Pharmacist-Driven Deprescribing Initiative in a Nursing Facility.

    PubMed

    Pruskowski, Jennifer; Handler, Steven M

    2017-08-01

    Many residents with life-limiting illnesses are being prescribed and taking potentially inappropriate medications (PIMs) and questionably beneficial medications either near or at the end of life. These medications can contribute to adverse drug reactions, increase morbidity, and increase unnecessary burden and cost. It is crucial that the process of deprescribing be incorporated into the care of these residents. After developing a clinical pharmacist-driven deprescribing initiative in the nursing facility, the objective of this project was to reduce the number of PIMs via accepted recommendations from the clinical pharmacist to the primary team. The Discussion to Ensure the Patient-centered, Health-focused, prognosis-Appropriate, and Rational Medication regimen (DE-PHARM) quality improvement-approved project was conducted in an urban, academic nursing facility in Pittsburgh, Pennsylvania. The pilot phase occurred between October 2015 and April 2016. To be included in this study, participants had to be a custodial resident of the nursing facility with a previously documented comfort-focused treatment plan. All medications used for the management of chronic comorbid diseases were eligible for review. Forty-seven residents managed by eight different primary teams met inclusion criteria. Thirty-nine recommendations for 23 residents were made by the clinical pharmacist, with an average of 0.82 and range of 0-5 recommendations per resident, respectively. Of those, only 10 (26%) were accepted, 1 (3%) was modified, 3 (7%) were rejected, and 25 (64%) had no response within the 120-day response period. Additionally, two residents died during the project, and one resident was readmitted to the hospital for a prolonged period of time. The pilot phase of the DE-PHARM project, a clinical pharmacist-driven deprescribing initiative, was designed and assessed. This project demonstrated the feasibility of such an initiative. Because of the complexity of such a process, special

  20. Purdue University National Biomedical Tracer Facility: Project definition phase. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, M.A.

    The proposed National Biomedical Tracer Facility (NBTF) will house a high-current accelerator dedicated to production of short-lived radionuclides for biomedical and scientific research. The NBTF will play a vital role in repairing and maintaining the United States` research infrastructure for generation of essential accelerator-based radioisotopes. If properly designed and managed, the NBTF should also achieve international recognition as a Center-of-Excellence for research on radioisotope production methods and for associated education and training. The current report documents the results of a DOE-funded NBTF Project Definition Phase study carried out to better define the technical feasibility and projected costs of establishing andmore » operating the NBTF. This report provides an overview of recommended Facility Design and Specifications, including Accelerator Design, Building Design, and the associated Construction Cost Estimates and Schedule. It is recommended that the NBTF be established as an integrated, comprehensive facility for meeting the diverse production, research, and educational missions set forth in previous documents. Based on an analysis of the projected production demands that will be placed on the NBTF, it appears that a 70 MeV, 1 mA, negative ion cyclotron will offer a good balance between production capabilities and the costs of accelerator purchase and operation. A preliminary architectural plan is presented for a facility designed specifically to fulfill the functions of the NBTF in a cost-effective manner. This report also presents a detailed analysis of the Required Federal State, and Local Permits that may be needed to establish the NBTF, along with schedules and cost estimates for obtaining these permits. The Handling, Storage, and Disposal of Radioactive Waste will pose some significant challenges in the operation of the NBTF, but at this stage of planning the associated problems do not appear to be prohibitive.« less

  1. 75 FR 55159 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    .... Above GS-15 Positions B. Classification 1. Occupational Series 2. Classification Standards and Position... Duty Locations Appendix B: Occupational Series by Occupational Family Appendix C: Intervention Model..., MD; Lakehurst, NJ; and Orlando, FL. These facilities support research, development, test, evaluation...

  2. 40 CFR Appendix A to Subpart A of... - Tables

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... precursor of PM2.5. Table 2a to Appendix A of Subpart A—Data Elements for Reporting on Emissions From Point Sources, Where Required by 40 CFR 51.30 Data elements Every-yearreporting Three-yearreporting (1... phone number ✓ ✓ (6) FIPS code ✓ ✓ (7) Facility ID codes ✓ ✓ (8) Unit ID code ✓ ✓ (9) Process ID code...

  3. Container Technology Study : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1980-10-01

    Volume II has nine appendixes as follows: Appendix A - Railroad Flatcar Data; Appendix B - Calculations; Appendix C - Record of Telephone Calls; Appendix D - Industry Interviews; Appendix E - Field Trips and Conferences; Appendix F - Annotated biblio...

  4. Appendix X. ComField Information Management System.

    ERIC Educational Resources Information Center

    Coffin, Robert W.

    This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…

  5. 49 CFR Appendix A to Part 37 - Modifications to Standards for Accessible Transportation Facilities

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... steps may have to travel compared to the general public. 406.8—Modification to 406 of Appendix D to 36... rail, commuter rail, and intercity rail systems where it is not operationally or structurally feasible...

  6. The ISOLDE facility and the HIE-HISOLDE project: Recent highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borge, M. J. G.

    2014-07-23

    The ISOLDE facility at CERN has as objective the production, study and research of nuclei far from stability. The facility provides low energy radioactive beams and post-accelerated beams. In the last 45 years the ISOLDE facility has gathered unique expertise in research with radioactive beams. Over 700 isotopes of more than 70 elements have been used in a wide range of research domains, including cutting edge studies in nuclear structure, atomic physics, nuclear astrophysics, and fundamental interactions. These nuclear probes are also used to do frontier research in solid state and life sciences. There is an on-going upgrade of themore » facility, the HIE-ISOLDE project, which aims to improve the ISOLDE capabilities in a wide front, from an energy increase of the post-accelerated beam to improvements in beam quality and beam purity. The first phase of HIE-ISOLDE will start for physics in the autumn of 2015 with an upgrade of energy for all post-accelerated ISOLDE beams up to 5.5 MeV/u. In this contribution the most recent highlights of the facility are presented.« less

  7. Multiple-Purpose Project, Osage River Basin, Osage River, Missouri. Harry S. Truman Dam & Reservoir Operation and Maintenance Manual. Appendix VII. Volume 1. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    RIVER MISSOURI Report from September 1966 HARRY S. TROMAN DAM & RESERVOIR November 1979 OPERATION AND MAINTENANCE MANUAL 6 PERFORMING DRG. REPORT N4040E...Two of this report ) VII- I- xxiv ............................. .... ... .... ... . .2. . . OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT CHAPTER 1 INTRODUCTION 1-01. Location and Description of Project: Harry S

  8. ITS component specification. Appendix B, Input data flows for components

    DOT National Transportation Integrated Search

    1997-11-01

    The objective of the Polaris Project is to define an Intelligent Transportation Systems (ITS) architecture for the state of Minnesota. This appendix defines the input data flows for each component of the Polaris Physical Architecture.

  9. ITS component specification. Appendix C, Output data flows for components

    DOT National Transportation Integrated Search

    1997-01-01

    The objective of the Polaris Project is to define an Intelligent Transportation Systems (ITS) architecture for the state of Minnesota. This appendix defines the output data flows for each component of the Polaris Physical Architecture.

  10. Educational Facility Design and Project Based Learning: "The Real Connection"

    ERIC Educational Resources Information Center

    Schrader, David L.; Sole, John

    2009-01-01

    There is a case to be made for the integration of the Project Based Service Learning (PBSL) process and the design and construction of educational facilities. A growing body of research supports the notion that the formulaic educational system of the last hundred years may no longer serve the learning styles of new and future generations. Their…

  11. Experiment Needs and Facilities Study Appendix A Transient Reactor Test Facility (TREAT) Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The TREAT Upgrade effort is designed to provide significant new capabilities to satisfy experiment requirements associated with key LMFBR Safety Issues. The upgrade consists of reactor-core modifications to supply the physics performance needed for the new experiments, an Advanced TREAT loop with size and thermal-hydraulics capabilities needed for the experiments, associated interface equipment for loop operations and handling, and facility modifications necessary to accommodate operations with the Loop. The costs and schedules of the tasks to be accomplished under the TREAT Upgrade project are summarized. Cost, including contingency, is about 10 million dollars (1976 dollars). A schedule for execution ofmore » 36 months has been established to provide the new capabilities in order to provide timely support of the LMFBR national effort. A key requirement for the facility modifications is that the reactor availability will not be interrupted for more than 12 weeks during the upgrade. The Advanced TREAT loop is the prototype for the STF small-bundle package loop. Modified TREAT fuel elements contain segments of graphite-matrix fuel with graded uranium loadings similar to those of STF. In addition, the TREAT upgrade provides for use of STF-like stainless steel-UO{sub 2} TREAT fuel for tests of fully enriched fuel bundles. This report will introduce the Upgrade study by presenting a brief description of the scope, performance capability, safety considerations, cost schedule, and development requirements. This work is followed by a "Design Description". Because greatly upgraded loop performance is central to the upgrade, a description is given of Advanced TREAT loop requirements prior to description of the loop concept. Performance requirements of the upgraded reactor system are given. An extensive discussion of the reactor physics calculations performed for the Upgrade concept study is provided. Adequate physics performance is essential for performance of experiments

  12. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kollar, Lenka; Mathews, Caroline E.

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states’ (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In ordermore » to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.« less

  13. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, N.

    1995-05-02

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD).

  14. 33 CFR 105.405 - Format and content of the Facility Security Plan (FSP).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Vulnerability and Security Measures Summary (Form CG-6025) in appendix A to part 105-Facility Vulnerability and... resubmission of the FSP. (c) The Facility Vulnerability and Security Measures Summary (Form CG-6025) must be completed using information in the FSA concerning identified vulnerabilities and information in the FSP...

  15. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Booster Applications Facility report, phase 2

    NASA Astrophysics Data System (ADS)

    Thieberger, P.

    1991-06-01

    This report summarizes studies and planning performed by Brookhaven National Laboratory (BNL) personnel at the request of NASA for the design, construction and operation of experimental areas and facilities for utilization of ion beams from the BNL Booster synchrotron particle accelerator. These facilities would be primarily utilized to simulate space radiation for radiobiological research, shielding studies and detector calibrations. The feasibility of such a project has been established, preliminary designs and cost estimates have been developed and a formal proposal can be submitted pending DOE concurrence. The main body of this report consists of the material presented by BNL during the meeting with a NASA appointed Panel on December 10 and 11, 1990. The individual speakers have provided brief summaries of their talks and explanations of their figures. In addition there are two appendices. One, contains detailed discussion of the shared mode of operation and the corresponding beam compatibility tables. The second appendix contains cost estimate details. An executive summary on budgets and schedules has been added, containing possible phased construction and outfitting scenarios and the corresponding expense and commitment profiles as well as new operational cost estimates. Material contained in the executive summary reflects the correction of some errors and new studies performed in response to the NASA Panel suggestions.

  17. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...

  18. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...

  19. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  20. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  1. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  2. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  3. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Appendix G to Part 151 G Appendix G to Part 151 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. G Appendix G to Part 151 There is set forth below an...

  4. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Appendix G to Part 151 G Appendix G to Part 151 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. G Appendix G to Part 151 There is set forth below an...

  5. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Appendix G to Part 151 G Appendix G to Part 151 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. G Appendix G to Part 151 There is set forth below an...

  6. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Appendix G to Part 151 G Appendix G to Part 151 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. G Appendix G to Part 151 There is set forth below an...

  7. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less

  9. 14 CFR Appendix B to Part 25 - Appendix B to Part 25

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Appendix B to Part 25 B Appendix B to Part 25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Pt. 25, App. B Appendix B to Part 25 EC28SE91.055 EC28SE91...

  10. 45 CFR Appendix A to Part 13 - Appendix A to Part 13

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Appendix A to Part 13 A Appendix A to Part 13 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT IN AGENCY PROCEEDINGS Pt. 13, App. A Appendix A to Part 13 Proceedings covered Statutory authority Applicable regulations...

  11. 45 CFR Appendix A to Part 13 - Appendix A to Part 13

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Appendix A to Part 13 A Appendix A to Part 13 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT IN AGENCY PROCEEDINGS Pt. 13, App. A Appendix A to Part 13 Proceedings covered Statutory authority Applicable regulations...

  12. 45 CFR Appendix A to Part 13 - Appendix A to Part 13

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Appendix A to Part 13 A Appendix A to Part 13 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT IN AGENCY PROCEEDINGS Pt. 13, App. A Appendix A to Part 13 Proceedings covered Statutory authority Applicable regulations...

  13. 14 CFR Appendix C to Part 151 - Appendix C to Part 151

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Appendix C to Part 151 C Appendix C to Part...) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. C Appendix C to Part 151 There is set forth below an... Items 1. Maintenance-type work, including: (a) Seal coats. (b) Crack filling. (c) Resealing joints. (d...

  14. 14 CFR Appendix C to Part 25 - Appendix C to Part 25

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Appendix C to Part 25 C Appendix C to Part... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Pt. 25, App. C Appendix C to Part 25 Part I—Atmospheric....062 EC28SE91.063 (c) Takeoff maximum icing. The maximum intensity of atmospheric icing conditions for...

  15. 14 CFR Appendix C to Part 25 - Appendix C to Part 25

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Appendix C to Part 25 C Appendix C to Part... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Pt. 25, App. C Appendix C to Part 25 Part I—Atmospheric....062 EC28SE91.063 (c) Takeoff maximum icing. The maximum intensity of atmospheric icing conditions for...

  16. 14 CFR Appendix C to Part 25 - Appendix C to Part 25

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Appendix C to Part 25 C Appendix C to Part... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Pt. 25, App. C Appendix C to Part 25 Part I—Atmospheric....062 EC28SE91.063 (c) Takeoff maximum icing. The maximum intensity of atmospheric icing conditions for...

  17. 14 CFR Appendix H to Part 151 - Appendix H to Part 151

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Appendix H to Part 151 H Appendix H to Part...) AIRPORTS FEDERAL AID TO AIRPORTS Pt. 151, App. H Appendix H to Part 151 There is set forth below the...)). H. Withholding for unpaid wages and liquidated damages, and priority of payment (1) The FAA may...

  18. Appendix I1-2 to Wind HUI Initiative 1: Field Campaign Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John Zack; Deborah Hanley; Dora Nakafuji

    This report is an appendix to the Hawaii WindHUI efforts to dev elop and operationalize short-term wind forecasting and wind ramp event forecasting capabilities. The report summarizes the WindNET field campaign deployment experiences and challenges. As part of the WindNET project on the Big Island of Hawaii, AWS Truepower (AWST) conducted a field campaign to assess the viability of deploying a network of monitoring systems to aid in local wind energy forecasting. The data provided at these monitoring locations, which were strategically placed around the Big Island of Hawaii based upon results from the Oahu Wind Integration and Transmission Studymore » (OWITS) observational targeting study (Figure 1), provided predictive indicators for improving wind forecasts and developing responsive strategies for managing real-time, wind-related system events. The goal of the field campaign was to make measurements from a network of remote monitoring devices to improve 1- to 3-hour look ahead forecasts for wind facilities.« less

  19. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Education & Collection Facility GSHP Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joplin, Jeff

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to amore » recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an

  1. [Interdisciplinary Cooperation as a Characteristic of Successful Rehabilitation Facilities--Results from the Project MeeR].

    PubMed

    Kleineke, V; Stamer, M; Zeisberger, M; Brandes, I; Meyer, T

    2015-08-01

    To determine if there is a difference between successful and less successful rehabilitation facilities concerning their extent and quality of interdisciplinary cooperation? This analysis is part of the project MeeR, that aims to identify characteristics of rehabilitation facilities related to successful rehabilitation. 6 facilities were recruited based on a quantitative analysis; 3 facilities that ranked as above average and 3 as below average in terms of their success in rehabilitating patients. Comprehensive qualitative data were collected on these 6 facilities. In above average rehabilitation facilities, the extent of interdisciplinary cooperation was higher than in below average facilities; the position of the medical profession was less dominant and there was a wider access to team meetings. Promotion of interdisciplinary cooperation is an important component for the improvement of the success of rehabilitation facilities. © Georg Thieme Verlag KG Stuttgart · New York.

  2. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less

  3. Osage River Basin, Osage River, Missouri, Harry S. Trumman Dam & Reservoir. Multiple-Purpose Project. Operation and Maintenance Manual. Appendix 7, Volume 2. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    PROJECT S TYPE OF REPORT & PERIOD COVEREDOSAGE RIVER BASIN ConStruction Foundation OSAGE RIVER MISSOURI Report from September 1966 HARRY S. TRUMAN DAM...OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT VOLUME II TABLE OF...09r IWNI’(ANSAS CITY M?5OU ....... 11 1 O IA R, MISSOURI HARRY S TRUMA DAM & 1K5(V01 = CONSTRUCT"ON FOUNDATION REPORT IGEOLOGIC UNIT DESCRIPTIONS

  4. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  5. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  6. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  7. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  8. Influence of computational fluid dynamics on experimental aerospace facilities: A fifteen year projection

    NASA Technical Reports Server (NTRS)

    1983-01-01

    An assessment was made of the impact of developments in computational fluid dynamics (CFD) on the traditional role of aerospace ground test facilities over the next fifteen years. With improvements in CFD and more powerful scientific computers projected over this period it is expected to have the capability to compute the flow over a complete aircraft at a unit cost three orders of magnitude lower than presently possible. Over the same period improvements in ground test facilities will progress by application of computational techniques including CFD to data acquisition, facility operational efficiency, and simulation of the light envelope; however, no dramatic change in unit cost is expected as greater efficiency will be countered by higher energy and labor costs.

  9. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...

  10. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  11. Lessons in Reading Reform: Finding What Works. Technical Appendix

    ERIC Educational Resources Information Center

    Betts, Julian R.; Zau, Andrew C.; Koedel, Cory

    2010-01-01

    This technical appendix provides more detail on the reading reforms implemented under the Blueprint for Student Success project in the San Diego Unified School District (SDUSD) between 2000 and 2005. It provides details on the dataset, the econometric methods the authors employed, and the results, which are also detailed and discussed in the main…

  12. 18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appendix A to Subpart H of Part 35 A Appendix A to Subpart H of Part 35 Conservation of Power and Water Resources FEDERAL... Rates Pt. 35, Subpt. H, App. A Appendix A to Subpart H of Part 35 Appendix A Standard Screen Format...

  13. 10 CFR Appendix A to Part 50 - General Design Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false General Design Criteria for Nuclear Power Plants A... FACILITIES Pt. 50, App. A Appendix A to Part 50—General Design Criteria for Nuclear Power Plants Table of... Design Bases for Protection Against Natural Phenomena 2 Fire Protection 3 Environmental and Dynamic...

  14. 10 CFR Appendix A to Part 50 - General Design Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false General Design Criteria for Nuclear Power Plants A... FACILITIES Pt. 50, App. A Appendix A to Part 50—General Design Criteria for Nuclear Power Plants Table of... Design Bases for Protection Against Natural Phenomena 2 Fire Protection 3 Environmental and Dynamic...

  15. 10 CFR Appendix A to Part 50 - General Design Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false General Design Criteria for Nuclear Power Plants A... FACILITIES Pt. 50, App. A Appendix A to Part 50—General Design Criteria for Nuclear Power Plants Table of... Design Bases for Protection Against Natural Phenomena 2 Fire Protection 3 Environmental and Dynamic...

  16. The radioactive ion beams facility project for the legnaro laboratories

    NASA Astrophysics Data System (ADS)

    Tecchio, Luigi B.

    1999-04-01

    In the frame work of the Italian participation to the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involving in the design and construction of prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has been already financially supported and the work is actually in progress. In this context, the LNL has been proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by using the ISOL method. The final goal consists in the production of neutron rich RIBs with masses ranging from 80 to 160 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is proposed to be developed in about 10 years from now and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999-2003). In such period of time is proposed the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production, to the BNCT applications and to the neutron physics. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed.

  17. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  18. 49 CFR Appendix B to Part 24 - Statistical Report Form

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION FOR FEDERAL AND FEDERALLY-ASSISTED PROGRAMS Pt. 24, App. B Appendix B to Part 24—Statistical... the purchase price for the property exceeded the amount offered as just compensation and efforts to... the fiscal year by project or program activities, and who purchased and moved to their replacement...

  19. Advanced Life Support Project Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  20. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    PubMed

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  1. Project Village conceptual plans. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming; proposed housing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less

  2. 34 CFR Appendix C to Part 379 - Calculating Required Matching Amount

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Calculating Required Matching Amount C Appendix C to Part 379 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY Pt. 379, App...

  3. [Psychiatric residential care facilities in the Puglia region. Phase 1 results of the PROGRES project].

    PubMed

    Germinario, Cinzia; Semisa, Domenico; Picoco, Fulvio; Prato, Rosa; Lopalco, Pietro Luigi; Quarto, Michele

    2004-01-01

    One of the more important aspects of the psychiatric care reform in Italy has been the opening of a great number of psychiatric Non-Hospital Residential Facilities (NHRF). However, 22 years have elapsed since the reform and there are still very scarce data regarding such facilities, the type of patients being accomodated, and the types of treatments provided. The "PROGRES" (PROGetto RESidenze - Residential Project) project is the first national study regarding NHRFs ever carried out in Italy. The objectives of "PROGRES" are to make a survey of all NHRFs in Italy (Phase 1) and to perform a detailed assessment of 20% of the surveyed facilities and of the type of patients being treated (Phase 2). This paper reports the survey (Phase 1) results for the Puglia Region. As of March 31, 2003, 113 psychiatric residential facilities were present in Puglia, with a total of 1.479 beds. This results in an average of 13,08 beds per facility and a rate of 3,86 beds per 10.000 inhabitants. The number of NHRFs present in the territory of each Local Health Unit in Puglia is very variable. Most NHRFs (57%) opened after January 1997. Eighty-three percent have a 24-hour staff coverage while only 5,3% has a 2-hour staff coverage. Eighty five percent of the residential facilities are financed by the Italian National Healthcare System, while a small percentage is privately funded. In over half (69,93%) of the NHRFs the predominant patient age group is 40-59 years; 26,4% of the residential facilities accommodate patients below age 40 and only 3,53% accommodate patients over 60 years old.

  4. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  6. Congenital absence of the vermiform appendix.

    PubMed

    Sarkar, Aniruddha

    2012-09-01

    Agenesis of the vermiform appendix is very rare. The incidence is estimated to be one in 100,000 laparotomies for suspected appendicitis. During a routine dissection of the abdomen in a 60-year-old donated male cadaver, the vermiform appendix was found to be absent. The ileocaecal junction and retrocaecal area were thoroughly searched, but the vermiform appendix was not found or appeared to resemble a tubercle. This is likely the first reported case of agenesis of a vermiform appendix in India. This suggests the possibility that the human vermiform appendix would ultimately become rudimentary or absent in the course of evolution.

  7. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  8. Enhancing resiliency for elderly populations : Shelter-in-place planning and training at facilities serving elderly populations through the Rhode Island Senior Resiliency Project.

    PubMed

    Smith, Richard; Mozzer, Michael; Albanese, Joseph; Paturas, James; Gold, Julia

    2017-06-01

    Elderly populations are disproportionately affected by disasters. In part, this is true because for many older adults, special assistance is needed to mitigate the consequences of disasters on their health and wellbeing. In addition, many older adults may reside in diverse living complexes such as long-term care facilities, assisted living facilities and independent-living senior housing complexes. Planning for each type of facility is different and the unique features of these facilities must be considered to develop readiness to deal with disasters. Based on this, the Rhode Island Department of Health established the Senior Resiliency Project to bolster the level of resiliency for the types of living facilities housing older adults. The project involves performing onsite assessments of energy resources, developing site-specific sheltering-inplace and energy resiliency plans, and educating and training facility employees and residents on these plans and steps they can take to be better prepared. Based on the feasibility of conducting these activities within a variety of facilities housing older adults, the project is segmented into three phases. This paper describes survey findings, outcomes of interventions, challenges and recommendations for bridging gaps observed in phases 1 and 2 of the project.

  9. Evaluation of Nuclear Facility Decommissioning Projects program: a reference test reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boing, L.E.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference test reactor (RTR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program. During the data extraction process no attempt was made to challenge any of the assumptions used in the original studies nor was any attempt made to update assumed methods or processes to state-of-the-art decommissioning techniques. In a few instances obvious errors were corrected after consultation with the studymore » author.« less

  10. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  11. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  12. Space Station Furnace Facility. Experiment/Facility Requirements Document (E/FRD), volume 2, appendix 5

    NASA Technical Reports Server (NTRS)

    Kephart, Nancy

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidifcation conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment, and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace.

  13. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  14. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  15. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  16. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  17. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  18. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  19. Appendix A : literature review.

    DOT National Transportation Integrated Search

    2013-03-01

    This appendix contains a review of the literature and other background information : germane to the experimental and analytical research presented in subsequent appendices. Table : 1 lists the sections and topics contained in this appendix and those ...

  20. Management aspects of Gemini's base facility operations project

    NASA Astrophysics Data System (ADS)

    Arriagada, Gustavo; Nitta, Atsuko; Adamson, A. J.; Nunez, Arturo; Serio, Andrew; Cordova, Martin

    2016-08-01

    Gemini's Base Facilities Operations (BFO) Project provided the capabilities to perform routine nighttime operations without anyone on the summit. The expected benefits were to achieve money savings and to become an enabler of the future development of remote operations. The project was executed using a tailored version of Prince2 project management methodology. It was schedule driven and managing it demanded flexibility and creativity to produce what was needed, taking into consideration all the constraints present at the time: Time available to implement BFO at Gemini North (GN), two years. The project had to be done in a matrix resources environment. There were only three resources assigned exclusively to BFO. The implementation of new capabilities had to be done without disrupting operations. And we needed to succeed, introducing the new operational model that implied Telescope and instrumentation Operators (Science Operations Specialists - SOS) relying on technology to assess summit conditions. To meet schedule we created a large number of concurrent smaller projects called Work Packages (WP). To be reassured that we would successfully implement BFO, we initially spent a good portion of time and effort, collecting and learning about user's needs. This was done through close interaction with SOSs, Observers, Engineers and Technicians. Once we had a clear understanding of the requirements, we took the approach of implementing the "bare minimum" necessary technology that would meet them and that would be maintainable in the long term. Another key element was the introduction of the "gradual descent" concept. In this, we increasingly provided tools to the SOSs and Observers to prevent them from going outside the control room during nighttime operations, giving them the opportunity of familiarizing themselves with the new tools over a time span of several months. Also, by using these tools at an early stage, Engineers and Technicians had more time for debugging

  1. IMPLEMENTATION OF THE SEISMIC DESIGN CRITERIA OF DOE-STD-1189-2008 APPENDIX A [FULL PAPER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OMBERG SK

    2008-05-14

    This paper describes the approach taken by two Fluor Hanford projects for implementing of the seismic design criteria from DOE-STD-1189-2008, Appendix A. The existing seismic design criteria and the new seismic design criteria is described, and an assessment of the primary differences provided. The gaps within the new system of seismic design criteria, which necessitate conduct of portions of work to the existing technical standards pending availability of applicable industry standards, is discussed. Two Hanford Site projects currently in the Control Decision (CD)-1 phase of design have developed an approach to implementation of the new criteria. Calculations have been performedmore » to determine the seismic design category for one project, based on information available in early CD-1. The potential effects of DOE-STD-1189-2008, Appendix A seismic design criteria on the process of project alternatives analysis is discussed. Present of this work is expected to benefit others in the DOE Complex that may be implementing DOE-STD-1189-2008.« less

  2. An Evaluation of Project Learning Tree in British Columbia. Appendices.

    ERIC Educational Resources Information Center

    Conry, Robert F.; And Others

    The volume contains seven appendices (A-G) which accompany the first volume. Appendix A provides a list of project personnel and of teachers who participated in the unit development workshop. Appendix B, composed of six sections, includes the unit lesson plans and teachers' guides used in the field study for grades 3, 5, and 7. The grade materials…

  3. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Pre-Application Early Review of Site Suitability Issues Q... FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This... Reactor Safeguards of requests for early review of one or more site suitability issues relating to the...

  4. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Pre-Application Early Review of Site Suitability Issues Q... FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This... Reactor Safeguards of requests for early review of one or more site suitability issues relating to the...

  5. 13 CFR Appendix A to Part 112 - Appendix A to Part 112

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... enterprise Executive Order 12138. Small business innovation and research Small Business Act, sec. 9... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Appendix A to Part 112 A Appendix A to Part 112 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NONDISCRIMINATION IN...

  6. 13 CFR Appendix A to Part 1171 - Appendix A to Part 1171

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... International Trade Program Small Business Act, section 22. Technical and Management Assistance Small Business... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Appendix A to Part 1171 A Appendix A to Part 1171 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NONDISCRIMINATION IN...

  7. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  9. 10 CFR 140.109 - Appendix I.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Appendix I. 140.109 Section 140.109 Energy NUCLEAR... Appendixes to Part 140 § 140.109 Appendix I. Nuclear Energy Liability Insurance Association master policy no. __ Nuclear Energy Liability Insurance (Secondary Financial Protection) Named Insured: Each person or...

  10. 10 CFR 140.109 - Appendix I.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Appendix I. 140.109 Section 140.109 Energy NUCLEAR... Appendixes to Part 140 § 140.109 Appendix I. Nuclear Energy Liability Insurance Association master policy no. __ Nuclear Energy Liability Insurance (Secondary Financial Protection) Named Insured: Each person or...

  11. 10 CFR 140.109 - Appendix I.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Appendix I. 140.109 Section 140.109 Energy NUCLEAR... Appendixes to Part 140 § 140.109 Appendix I. Nuclear Energy Liability Insurance Association master policy no. __ Nuclear Energy Liability Insurance (Secondary Financial Protection) Named Insured: Each person or...

  12. 10 CFR 140.109 - Appendix I.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Appendix I. 140.109 Section 140.109 Energy NUCLEAR... Appendixes to Part 140 § 140.109 Appendix I. Nuclear Energy Liability Insurance Association master policy no. __ Nuclear Energy Liability Insurance (Secondary Financial Protection) Named Insured: Each person or...

  13. 10 CFR 140.109 - Appendix I.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Appendix I. 140.109 Section 140.109 Energy NUCLEAR... Appendixes to Part 140 § 140.109 Appendix I. Nuclear Energy Liability Insurance Association master policy no. __ Nuclear Energy Liability Insurance (Secondary Financial Protection) Named Insured: Each person or...

  14. 7 CFR Appendix A to Subpart E of... - Hazard Potential Classification for Civil Works Projects

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES... appendix is U.S. Army Corps of Engineers Engineering and Design Dam Safety Assurance Program, ER 1110-2... human habitation) Uncertain (rural location with few residences and only transient or industrial...

  15. 7 CFR Appendix A to Subpart E of... - Hazard Potential Classification for Civil Works Projects

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES... appendix is U.S. Army Corps of Engineers Engineering and Design Dam Safety Assurance Program, ER 1110-2... human habitation) Uncertain (rural location with few residences and only transient or industrial...

  16. 7 CFR Appendix A to Subpart E of... - Hazard Potential Classification for Civil Works Projects

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES... appendix is U.S. Army Corps of Engineers Engineering and Design Dam Safety Assurance Program, ER 1110-2... human habitation) Uncertain (rural location with few residences and only transient or industrial...

  17. 7 CFR Appendix A to Subpart E of... - Hazard Potential Classification for Civil Works Projects

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES... appendix is U.S. Army Corps of Engineers Engineering and Design Dam Safety Assurance Program, ER 1110-2... human habitation) Uncertain (rural location with few residences and only transient or industrial...

  18. 24 CFR Appendix B to 24 Cfr Part 3400 - Appendix B to 24 CFR Part 3400

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Appendix B to 24 CFR Part 3400 B Appendix B to 24 CFR Part 3400 Housing and Urban Development Regulations Relating to Housing and Urban... HOUSING AND URBAN DEVELOPMENT SAFE MORTGAGE LICENSING ACT Pt. 3400, App. B Appendix B to 24 CFR Part 3400...

  19. 30 CFR Appendix A to Subpart J of... - Appendix A to Subpart J of Part 75

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Appendix A to Subpart J of Part 75 A Appendix A to Subpart J of Part 75 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Medium-Voltage Alternating Current Circuits Pt. 75, Subpt. J, App. A Appendix A to Subpart J of Part 75...

  20. 24 CFR Appendix C to 24 Cfr Part 3400 - Appendix C to 24 CFR Part 3400

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Appendix C to 24 CFR Part 3400 C Appendix C to 24 CFR Part 3400 Housing and Urban Development Regulations Relating to Housing and Urban... HOUSING AND URBAN DEVELOPMENT SAFE MORTGAGE LICENSING ACT Pt. 3400, App. C Appendix C to 24 CFR Part 3400...

  1. 45 CFR Appendix F to Part 1355 - Appendix F to Part 1355

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Appendix F to Part 1355 F Appendix F to Part 1355 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE...

  2. 13 CFR Appendix A to Part 112 - Appendix A to Part 112

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... development centers Small Business Act, sec. 21 and Pub. L. 96-302. International Trade Program Small Business... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Appendix A to Part 112 A Appendix A to Part 112 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NONDISCRIMINATION IN...

  3. Emergency Victim Care. A Training Manual for Emergency Medical Technicians. Module 14. Appendix I: Communicating with Deaf and Hearing Impaired Patients. Appendix II: Medical Terminology. Appendix III: EMS Organizations. Appendix IV: Legislation (Ohio). Glossary of Terms. Index. Revised.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Vocational Education.

    This training manual for emergency medical technicians, one of 14 modules that comprise the Emergency Victim Care textbook, contains appendixes, a glossary, and an index. The first appendix is an article on communicating with deaf and hearing-impaired patients. Appendix 2, the largest section in this manual, is an introduction to medical…

  4. 18 CFR Appendix B to Subpart H of... - Appendix B to Subpart H of Part 35

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appendix B to Subpart H of Part 35 B Appendix B to Subpart H of Part 35 Conservation of Power and Water Resources FEDERAL... Rates Pt. 35, Subpt. H, App. B Appendix B to Subpart H of Part 35 This is an example of the required...

  5. 10 CFR Appendix B to Part 50 - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Quality Assurance Criteria for Nuclear Power Plants and... LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. B Appendix B to Part 50—Quality Assurance... report a description of the quality assurance program to be applied to the design, fabrication...

  6. 12 CFR Appendixes A-H to Subpart A... - Appendixes A-H to Subpart A of Part 702

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Appendixes A-H to Subpart A of Part 702 A Appendixes A-H to Subpart A of Part 702 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS PROMPT CORRECTIVE ACTION Net Worth Classification Pt. 702, Apps. Appendixes A-H to...

  7. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. Metrology for decommissioning nuclear facilities: Partial outcomes of joint research project within the European Metrology Research Program.

    PubMed

    Suran, Jiri; Kovar, Petr; Smoldasova, Jana; Solc, Jaroslav; Van Ammel, Raf; Garcia Miranda, Maria; Russell, Ben; Arnold, Dirk; Zapata-García, Daniel; Boden, Sven; Rogiers, Bart; Sand, Johan; Peräjärvi, Kari; Holm, Philip; Hay, Bruno; Failleau, Guillaume; Plumeri, Stephane; Laurent Beck, Yves; Grisa, Tomas

    2018-04-01

    Decommissioning of nuclear facilities incurs high costs regarding the accurate characterisation and correct disposal of the decommissioned materials. Therefore, there is a need for the implementation of new and traceable measurement technologies to select the appropriate release or disposal route of radioactive wastes. This paper addresses some of the innovative outcomes of the project "Metrology for Decommissioning Nuclear Facilities" related to mapping of contamination inside nuclear facilities, waste clearance measurement, Raman distributed temperature sensing for long term repository integrity monitoring and validation of radiochemical procedures. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. EERC pilot-scale CFBC evaluation facility Project CFB test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, M.D.; Hajicek, D.R.; Henderson, A.K.

    Project CFB was initiated at the University of North Dakota Energy and Environmental Research Center (EERC) in May 1988. Specific goals of the project were to (1) construct a circulating fluidized-bed combustor (CFBC) facility representative of the major boiler vendors' designs with the capability of producing scalable data, (2) develop a database for use in making future evaluations of CFBC technology, and (3) provide a facility for evaluating fuels, free of vendor bias for use in the - energy industry. Five coals were test-burned in the 1-MWth unit: North Dakota and Asian lignites, a Wyoming subbituminous, and Colorado and Pennsylvaniamore » bituminous coats. A total of 54 steady-state test periods were conducted, with the key test parameters being the average combustor temperature, excess air, superficial gas velocity, calcium-to-sulfur molar ratio, and the primary air-to-secondary air split. The capture for a coal fired in a CFBC is primarily dependent upon the total alkali-to-sulfur ratio. The required alkali-to ratio for 90% sulfur retention ranged from 1.4 to 4.9, depending upon coal type. While an alkali-to-ratio of 4.9 was required to meet 90% sulfur retention for the Salt Creek coal versus 1.4 for the Asian lignite, the total amount of sorbent addition required is much less for the Salt Creek coal, 4.2 pound sorbent per million Btu coal input, versus 62 pound/million Btu for the Asian lignite. The bituminous coals tested show optimal capture at combustor temperatures of approximately 1550[degree]F, with low-rank coals having optimal sulfur capture approximately 100[degree]F lower.« less

  11. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  13. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  14. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  16. 40 CFR Appendix B to Part 66 - Instruction Manual

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Instruction Manual B Appendix B to...) ASSESSMENT AND COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Pt. 66, App. B Appendix B to Part 66—Instruction Manual Note: For text of appendix B see appendix B to part 67. ...

  17. 40 CFR Appendix C to Part 66 - Computer Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Computer Program C Appendix C to Part...) ASSESSMENT AND COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Pt. 66, App. C Appendix C to Part 66—Computer Program Note: For text of appendix C see appendix C to part 67. ...

  18. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  19. 46 CFR Appendix A - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false [Reserved] A Appendix A Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System Management Information System requirements. Appendix A [Reserved] 46 CFR Ch. I (10-1-10 Edition...

  20. Waste-Management Education and Research Consortium (WERC) annual progress report, 1991--1992. Appendixes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-07

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineering; Appendix D - Non-degree Certificate Program; Appendix E - Curriculum for Associate Degree Program; Appendix F - Curriculum for NCC Program; Appendix G - Information 1991 Teleconference Series; Appendix H - Information on 1992 Teleconference Series; Appendix I - WERC interactive Television Courses; Appendix J - WERC Research Seminar Series; Appendix K - Sites for Hazardous/Radioactive Waste Management Series; Appendix L- Summary of Technology Development of the Second Year; Appendix M -more » List of Major Publications Resulting from WERC; Appendix N - Types of Equipment at WERC Laboratories.« less

  1. 34 CFR Appendix B to Subpart B of... - Appendix I, Standards for Audit of Governmental Organizations, Programs, Activities, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Organizations, Programs, Activities, and Functions (GAO) B Appendix B to Subpart B of Part 668 Education... Programs Pt. 668, Subpt. B, App. B Appendix B to Subpart B of Part 668—Appendix I, Standards for Audit of... required for the practice of public accountancy by the regulatory authorities of the States.” 1 1 Letter (B...

  2. 34 CFR Appendix B to Subpart B of... - Appendix I, Standards for Audit of Governmental Organizations, Programs, Activities, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Organizations, Programs, Activities, and Functions (GAO) B Appendix B to Subpart B of Part 668 Education... Programs Pt. 668, Subpt. B, App. B Appendix B to Subpart B of Part 668—Appendix I, Standards for Audit of... required for the practice of public accountancy by the regulatory authorities of the States.” 1 1 Letter (B...

  3. 34 CFR Appendix B to Subpart B of... - Appendix I, Standards for Audit of Governmental Organizations, Programs, Activities, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Organizations, Programs, Activities, and Functions (GAO) B Appendix B to Subpart B of Part 668 Education... Programs Pt. 668, Subpt. B, App. B Appendix B to Subpart B of Part 668—Appendix I, Standards for Audit of... required for the practice of public accountancy by the regulatory authorities of the States.” 1 1 Letter (B...

  4. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Subpt. G, App. A Appendix A to Subpart G—List of Activities Eligible for Funding Under BIA..., or purchasing of maintenance equipment. 13. Paying utilities cost for roadway lighting and traffic signals. 14. Purchasing maintenance materials. 15. Developing, implementing, and maintaining an IRR...

  5. 5 CFR Appendix C to Part 2634 - Privacy Act and Paperwork Reduction Act Notices for Appendixes A and B

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Notices for Appendixes A and B C Appendix C to Part 2634 Administrative Personnel OFFICE OF GOVERNMENT... DIVESTITURE Pt. 2634, App. C Appendix C to Part 2634—Privacy Act and Paperwork Reduction Act Notices for... (the “Ethics Act”) (5 U.S.C. App.) and subpart D of 5 CFR part 2634 of the regulations of the Office of...

  6. 5 CFR Appendix C to Part 2634 - Privacy Act and Paperwork Reduction Act Notices for Appendixes A and B

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Notices for Appendixes A and B C Appendix C to Part 2634 Administrative Personnel OFFICE OF GOVERNMENT... DIVESTITURE Pt. 2634, App. C Appendix C to Part 2634—Privacy Act and Paperwork Reduction Act Notices for... (the “Ethics Act”) (5 U.S.C. App.) and subpart D of 5 CFR part 2634 of the regulations of the Office of...

  7. Complementary and Alternative Medicine in the Military Health System: Appendixes

    DTIC Science & Technology

    2017-01-01

    report. Appendixes F through H supply other supplementary material. Appendixes F and G contain the CAM survey instrument and a glossary of CAM services...respectively. Appendix H contains tables of detailed results from the CAM survey and the MHS administrative data analyses. Individual tables in...this appendix are referenced in Chapters Three through Seven of the main report. 2 Table of Contents Appendix F: CAM Survey Instrument

  8. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  9. Report: American Recovery and Reinvestment Act Site Visit of the Wastewater Treatment Facility Improvements Project, Perkins, Oklahoma

    EPA Pesticide Factsheets

    Report #11-R-0214, May 2, 2011. We conducted an unannounced visit of the construction site of the Perkins Public Works Authority’s wastewater treatment facility improvements project in Perkins, Oklahoma, on April 19–22, 2010.

  10. Lessons Learned from the On-Site Distillation of Used Solvents Generated by Health Care Facilities.

    ERIC Educational Resources Information Center

    Huang, Ching-San; Ciesla, John

    1992-01-01

    Discusses the sources of contaminants found in used solvents generated by the histopathological laboratories at health care facilities and the technical problems, corrective measures, and economic analysis associated with the on-site recycling and reusing of these solvents. An appendix contains an economic analysis for a used-solvent recycling…

  11. Energy Savings and Sustainability Opportunities at US Army Corps of Engineers Facilities: A Guide to Identify, Prioritize, and Estimate Projects at Complexes That Have Not Conducted a Facility-Level Energy and Water Evaluation

    DTIC Science & Technology

    2012-06-16

    Engineers to help identify and develop energy and water conservation projects in the facilities for which they are responsible. DISCLAIMER: The...and water throughout their facility. To identify energy and water conservation measures (ECMs), an energy manager would generally start by performing...an Energy and Water Conservation Assessment, essentially a facility-level evaluation of the en- ergy and water consuming equipment and systems that

  12. National Biomedical Tracer Facility. Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schafer, R.

    We request a $25 million government-guaranteed, interest-free loan to be repaid over a 30-year period for construction and initial operations of a cyclotron-based National Biomedical Tracer Facility (NBTF) in North Central Texas. The NBTF will be co-located with a linear accelerator-based commercial radioisotope production facility, funded by the private sector at approximately $28 million. In addition, research radioisotope production by the NBTF will be coordinated through an association with an existing U.S. nuclear reactor center that will produce research and commercial radioisotopes through neutron reactions. The combined facilities will provide the full range of technology for radioisotope production and research:more » fast neutrons, thermal neutrons, and particle beams (H{sup -}, H{sup +}, and D{sup +}). The proposed NBTF facility includes an 80 MeV, 1 mA H{sup -} cyclotron that will produce proton-induced (neutron deficient) research isotopes.« less

  13. 32 CFR Appendix A to Part 272 - Principles for the Conduct and Support of Basic Research

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... those agencies' investments as appropriate. 5. Merit review is used to select basic research projects... Research A Appendix A to Part 272 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS ADMINISTRATION AND SUPPORT OF BASIC RESEARCH BY THE...

  14. Feasibility study for biomass power plants in Thailand. Volume 2. appendix: Detailed financial analysis results. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report presents a technical and commercial analysis for the development of three nearly identical electricity generating facilities (biomass steam power plants) in the towns of Chachgoengsao, Suphan Buri, and Pichit in Thailand. Volume 2 of the study contains the following appendix: Detailed Financial Analysis Results.

  15. Deterioration of Synthetic Fiber Rope during Marine Usage. Appendix A.

    DTIC Science & Technology

    1981-12-31

    Rigidity, Moisture and Fibre Structure, JTI 48(6), T163-%174 (1957). R394 Khosla, N.K., Shrinkage Properties of Continuous Filament Yarns with Different...8217D-Ai3i 685 DETERIORATION OF SYNTHETIC FIBER ROPE DURING MARINE i/i USAGE APPENDIX AU) MASSACHUSETTS INST OF TECH CAMBRIDGE S BACKER ET AL. 31 DEC...79 70A -. - - DETERIORATION OF SYNTHETIC FIBER ROPE DURING MARINE USAGE -- APPNDIX A PROGRESS REPORT PROJECT R/T-11 PERIOD JANUARY 1 - DECEMBER 31

  16. The NTF as a national facility. [project planning

    NASA Technical Reports Server (NTRS)

    Nicks, O. W.

    1977-01-01

    Activities which led to the definition of the National Transonic Facility and the general agreements reached regarding its use and operations are reviewed. Topics discussed include: redefinition of test requirements, development of low cost options, consideration of a single transonic facility using existing hardware if feasible, facility concept recommendations, and acquisition schedule proposals.

  17. The Potential Transfer of Industrial Skills from Defense to Nondefense Industries. Volume II, Technical Appendix.

    ERIC Educational Resources Information Center

    California State Dept. of Employment, Sacramento.

    This study of skill transferability between missile production and nondefense industries provides the necessary data to help formulate retraining and other programs designed to help workers adjust to cutbacks in defense spending. This technical appendix to the project report contains the data upon which the report's conclusions are based. The…

  18. Summary of operations and performance of the Murdock site restoration project in 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters ofmore » a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix

  19. Selection and Validation of Model Early Childhood Projects: Final Report.

    ERIC Educational Resources Information Center

    Stock, John R.; And Others

    Presented is the final report of a research program to select and describe outstanding Handicapped Children's Early Education Program (HCEEP) projects. Projects were analyzed in terms of 14 components of an HCEEP program (such as screening, programing, and inservice training). A detailed discussion of model selection and validation is appendixed.)…

  20. Appendix (image)

    MedlinePlus

    ... become infected. Although most people are familiar with appendicitis, it is a relatively rare disease. It is ... of the appendix (appendectomy). Recovery time for uncomplicated appendicitis is usually just three days.

  1. Waste receiving and processing facility module 1 data management system software project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  2. 32 CFR Appendix D to Part 636 - Glossary

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Glossary D Appendix D to Part 636 National... INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Pt. 636, App. D Appendix D to Part 636—Glossary In addition to the terms listed in appendix D to part 634 of this subchapter, the following terms...

  3. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2007-09-16

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility was used in the early to mid-1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles in the immediate area. Identified as Corrective Action Unit 115, the TCA facility was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the ''Federal Facilitymore » Agreement and Consent Order''. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously provided technical decisions are made by an experienced decision maker within the site conceptual site model, identified in the Data Quality Objective process. Facility closure involved a seven-step decommissioning strategy. Key lessons learned from the project included: (1) Targeted preliminary investigation activities provided a more solid technical approach, reduced surprises and scope creep, and made the working environment safer for the D&D worker. (2) Early identification of risks and uncertainties provided opportunities for risk management and mitigation planning to address challenges and unanticipated conditions. (3) Team reviews provided an excellent mechanism to consider all aspects of the task, integrated safety into activity performance, increase team unity and ''buy-in'' and promoted innovative and time saving ideas. (4) Development of CED protocols ensured safety and control. (5) The same proven D&D strategy is now being employed on the larger ''sister'' facility, Test Cell C.« less

  4. Multispan Elevated Guideway Design for Passenger Transport Vehicles : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1975-04-01

    Contents: Appendix A - derivation of vehicle-guideway interaction equations; Appendix B - evaluation of pier support dynamics; Appendix C - computer simulation program of two-dimensional vehicle over a multi-span guideway; Appendix D - computer progr...

  5. 30 CFR 285.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651... facilities on my limited lease or any facilities on my project easement proposed under my GAP? If you are...

  6. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less

  7. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  8. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  9. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  10. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  11. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  12. 13 CFR Appendix A to Subpart A of... - Appendix A to Subpart A of Part 113

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... innovation and research Small Business Act, sec. 9. Procurement automated source system. Small Business Act... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Appendix A to Subpart A of Part 113 A Appendix A to Subpart A of Part 113 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION...

  13. 30 CFR Appendix I to Subpart J of... - Appendix I to Subpart J of Part 7

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Appendix I to Subpart J of Part 7 I Appendix I to Subpart J of Part 7 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor...

  14. T1 bright appendix sign to exclude acute appendicitis in pregnant women.

    PubMed

    Shin, Ilah; An, Chansik; Lim, Joon Seok; Kim, Myeong-Jin; Chung, Yong Eun

    2017-08-01

    To evaluate the diagnostic value of the T1 bright appendix sign for the diagnosis of acute appendicitis in pregnant women. This retrospective study included 125 pregnant women with suspected appendicitis who underwent magnetic resonance (MR) imaging. The T1 bright appendix sign was defined as a high intensity signal filling more than half length of the appendix on T1-weighted imaging. Sensitivity, specificity, positive predictive value (PPV) and negative predictive value (NPV) of the T1 bright appendix sign for normal appendix identification were calculated in all patients and in those with borderline-sized appendices (6-7 mm). The T1 bright appendix sign was seen in 51% of patients with normal appendices, but only in 4.5% of patients with acute appendicitis. The overall sensitivity, specificity, PPV, and NPV of the T1 bright appendix sign for normal appendix diagnosis were 44.9%, 95.5%, 97.6%, and 30.0%, respectively. All four patients with borderline sized appendix with appendicitis showed negative T1 bright appendix sign. The T1 bright appendix sign is a specific finding for the diagnosis of a normal appendix in pregnant women with suspected acute appendicitis. • Magnetic resonance imaging is increasingly used in emergency settings. • Acute appendicitis is the most common cause of acute abdomen. • Magnetic resonance imaging is widely used in pregnant population. • T1 bright appendix sign can be a specific sign representing normal appendix.

  15. 10 CFR Appendix A to Part 603 - Applicable Federal Statutes, Executive Orders, and Government-wide Regulations

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Applicable Federal Statutes, Executive Orders, and Government-wide Regulations A Appendix A to Part 603 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE... sources of drinking water. 4. If the project may impact a historic property, it is subject to the National...

  16. 10 CFR Appendix A to Part 603 - Applicable Federal Statutes, Executive Orders, and Government-wide Regulations

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Applicable Federal Statutes, Executive Orders, and Government-wide Regulations A Appendix A to Part 603 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE... sources of drinking water. 4. If the project may impact a historic property, it is subject to the National...

  17. 10 CFR Appendix A to Part 603 - Applicable Federal Statutes, Executive Orders, and Government-wide Regulations

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Applicable Federal Statutes, Executive Orders, and Government-wide Regulations A Appendix A to Part 603 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE... sources of drinking water. 4. If the project may impact a historic property, it is subject to the National...

  18. 10 CFR Appendix A to Part 603 - Applicable Federal Statutes, Executive Orders, and Government-wide Regulations

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Applicable Federal Statutes, Executive Orders, and Government-wide Regulations A Appendix A to Part 603 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE... sources of drinking water. 4. If the project may impact a historic property, it is subject to the National...

  19. 10 CFR Appendix A to Part 603 - Applicable Federal Statutes, Executive Orders, and Government-wide Regulations

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Applicable Federal Statutes, Executive Orders, and Government-wide Regulations A Appendix A to Part 603 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE... sources of drinking water. 4. If the project may impact a historic property, it is subject to the National...

  20. Making of the NSTX Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. Neumeyer; M. Ono; S.M. Kaye

    1999-11-01

    The NSTX (National Spherical Torus Experiment) facility located at Princeton Plasma Physics Laboratory is the newest national fusion science experimental facility for the restructured US Fusion Energy Science Program. The NSTX project was approved in FY 97 as the first proof-of-principle national fusion facility dedicated to the spherical torus research. On Feb. 15, 1999, the first plasma was achieved 10 weeks ahead of schedule. The project was completed on budget and with an outstanding safety record. This paper gives an overview of the NSTX facility construction and the initial plasma operations.

  1. 18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Rates Pt. 35, Subpt. H, App. A Appendix A to Subpart H of Part 35 Appendix A Standard Screen Format... Reference Seller and Affiliate Capacity A Installed Capacity 19,500 Workpaper. B Long-Term Firm Purchases... Capacity E Installed Capacity 8,000 Workpaper. F Long-Term Firm Purchases 500 Workpaper. G Long-Term Firm...

  2. TRIGA Mark II nuclear reactor facility. Final report, 1 July 1980--30 June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryan, B.C.

    1997-05-01

    This report is a final culmination of activities funded through the Department of Energy`s (DOE) University Reactor Sharing Program, Grant DE-FG02-80ER10273, during the period 1 July 1980 through 30 June 1995. Progress reports have been periodically issued to the DOE, namely the Reactor Facility Annual Reports C00-2082/2219-7 through C00-2082/10723-21, which are contained as an appendix to this report. Due to the extent of time covered by this grant, summary tables are presented. Table 1 lists the fiscal year financial obligations of the grant. As listed in the original grant proposals, the DOE grant financed 70% of project costs, namely themore » total amount spent of these projects minus materials costs and technical support. Thus the bulk of funds was spent directly on reactor operations. With the exception of a few years, spending was in excess of the grant amount. As shown in Tables 2 and 3, the Reactor Sharing grant funded a immense number of research projects in nuclear engineering, geology, animal science, chemistry, anthropology, veterinary medicine, and many other fields. A list of these users is provided. Out of the average 3000 visitors per year, some groups participated in classes involving the reactor such as Boy Scout Merit Badge classes, teacher`s workshops, and summer internships. A large number of these projects met the requirements for the Reactor Sharing grant, but were funded by the University instead.« less

  3. 49 CFR Appendix B to Subchapter B... - Special Agents

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Special Agents B Appendix B to Subchapter B of Chapter III Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER..., Subch. B, App. B Appendix B to Subchapter B of Chapter III—Special Agents Cautionary note: This appendix...

  4. 49 CFR Appendix B to Subchapter B... - Special Agents

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Special Agents B Appendix B to Subchapter B of Chapter III Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER..., Subch. B, App. B Appendix B to Subchapter B of Chapter III—Special Agents Cautionary note: This appendix...

  5. 49 CFR Appendix B to Subchapter B... - Special Agents

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Special Agents B Appendix B to Subchapter B of Chapter III Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER..., Subch. B, App. B Appendix B to Subchapter B of Chapter III—Special Agents Cautionary note: This appendix...

  6. [Educational Facilities for Pregnant School-Age Girls in Districts 3, 4, 12, 13, and 18. Project No. 1369. Evaluation of ESEA Title I Projects in New York City 1968-69.

    ERIC Educational Resources Information Center

    Appel, Yetta; Berken, Ruth R.

    This project for pregnant school age girls is an ESEA Title I program operating in five facilities in Manhattan, Bronx, and Brooklyn. The primary objective of the project was to assist pregnant school age girls complete their education by being able to attend school. Additional objectives included provision of information and training in personal…

  7. Materials sciences research. [research facilities, research projects, and technical reports of materials tests

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Research projects involving materials research conducted by various international test facilities are reported. Much of the materials research is classified in the following areas: (1) acousto-optic, acousto-electric, and ultrasonic research, (2) research for elucidating transport phenomena in well characterized oxides, (3) research in semiconductor materials and semiconductor devices, (4) the study of interfaces and interfacial phenomena, and (5) materials research relevant to natural resources. Descriptions of the individual research programs are listed alphabetically by the name of the author and show all personnel involved, resulting publications, and associated meeting speeches.

  8. Synchrotron topography project. Progress report, January 20, 1982-October 20, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilello, J.C.; Chen, H.; Hmelo, A.B.

    1982-01-01

    The collaborators have participated in the Synchrotron Topography Project (STP) which has designed and developed instrumentation for an x-ray topography station at the National Synchrotron Light Source (NSLS) at Brookhaven National Laboratory (BNL). The two principle instruments constructed consist of a White Beam Camera (WBC) and a Multiple Crystal Camera (MCC) with high planar collimation and wide area image coverage. It is possible to perform in-situ studies in a versatile environmental chamber equipped with a miniature mechanical testing stage for both the WBC and MCC systems. Real-time video imaging plus a rapid feed cassette holder for high resolution photographic platesmore » are available for recording topographs. Provisions are made for other types of photon detection as well as spectroscopy. The facilities for the entire station have been designed for remote operation using a LSI-11/23 plus suitable interfacing. These instruments will be described briefly and the current status of the program will be reviewed. The Appendix of this report presents titles, authors and abstracts of other technical work associated with this project during the current period.« less

  9. 12 CFR Appendix B to Part 573 - Sample Clauses

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Sample Clauses B Appendix B to Part 573 Banks... INFORMATION Pt. 573, App. B Appendix B to Part 573—Sample Clauses Link to an amendment published at 74 FR... redesignated appendix B was removed, effective Jan. 1, 2012. ...

  10. 40 CFR Appendix B to Part 67 - Instruction Manual

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Instruction Manual B Appendix B to...) EPA APPROVAL OF STATE NONCOMPLIANCE PENALTY PROGRAM Pt. 67, App. B Appendix B to Part 67—Instruction Manual Note: EPA will make copies of appendix B available from: Director, Stationary Source Compliance...

  11. Appendix to the final environmental impact report supplement : Northeast corridor improvement project electrification - New Haven, CT to Boston, MA

    DOT National Transportation Integrated Search

    1995-05-01

    This document is an appendix to the Final Environmental Impact Report Supplement, published on February 15, 1995, addressing the proposal by the National Railroad Passenger Corporation (AMTRK) to complete the electrificaiton of the Northeast Corridor...

  12. 2018 DOE Solid-State Lighting Project Portfolio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The 2018 Solid-State Lighting Project Portfolio provides an overview of all SSL projects that have been funded by DOE since 2000. Projects that were active during 2017 are found in the main body of this report, and all historic projects can be found in the appendix. Within these sections, project profiles are sorted by technology type (i.e., LED or OLED) and then by performer name. A profile is provided on each project. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually, although the research describedmore » in the Portfolio changes periodically as new projects are initiated and existing ones are concluded.« less

  13. Project for the development of the linac based NCT facility in University of Tsukuba.

    PubMed

    Kumada, H; Matsumura, A; Sakurai, H; Sakae, T; Yoshioka, M; Kobayashi, H; Matsumoto, H; Kiyanagi, Y; Shibata, T; Nakashima, H

    2014-06-01

    A project team headed by University of Tsukuba launched the development of a new accelerator based BNCT facility. In the project, we have adopted Radio-Frequency Quadrupole (RFQ)+Drift Tube Linac (DTL) type linac as proton accelerators. Proton energy generated from the linac was set to 8MeV and average current was 10mA. The linac tube has been constructed by Mitsubishi Heavy Industry Co. For neutron generator device, beryllium is selected as neutron target material; high intensity neutrons are generated by the reaction with beryllium and the 80kW proton beam. Our team chose beryllium as the neutron target material. At present beryllium target system is being designed with Monte-Carlo estimations and heat analysis with ANSYS. The neutron generator consists of moderator, collimator and shielding. It is being designed together with the beryllium target system. We also acquired a building in Tokai village; the building has been renovated for use as BNCT treatment facility. It is noteworthy that the linac tube had been installed in the facility in September 2012. In BNCT procedure, several medical devices are required for BNCT treatment such as treatment planning system, patient positioning device and radiation monitors. Thus these are being developed together with the linac based neutron source. For treatment planning system, we are now developing a new multi-modal Monte-Carlo treatment planning system based on JCDS. The system allows us to perform dose estimation for BNCT as well as particle radiotherapy and X-ray therapy. And the patient positioning device can navigate a patient to irradiation position quickly and properly. Furthermore the device is able to monitor movement of the patient׳s position during irradiation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. 40 CFR Appendix C to Part 67 - Computer Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Computer Program C Appendix C to Part... APPROVAL OF STATE NONCOMPLIANCE PENALTY PROGRAM Pt. 67, App. C Appendix C to Part 67—Computer Program Note: EPA will make copies of appendix C available from: Director, Stationary Source Compliance Division, EN...

  15. 14 CFR Appendix H to Part 121 - Advanced Simulation

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Advanced Simulation H Appendix H to Part... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Pt. 121, App. H Appendix H to Part 121—Advanced... ensure that all instructors and check airmen used in appendix H training and checking are highly...

  16. Production Facility Prototype Blower 1000 Hour Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert; Dale, Gregory E.; Romero, Frank Patrick

    2016-10-18

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is now installed at the LANL facility for target and component flow testing. Two extended tests of >1000 hr operation have been completed. Those results and discussion thereof are reported herein. Also included in Appendix A is the detailed description of the blower and its installation, while Appendix B documents the pressure vessel design analysis. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are in Appendix B.« less

  17. Hydrologic Instrumentation Facility of the U.S. Geological Survey, annual report for fiscal year 1993

    USGS Publications Warehouse

    Latkovich, V.J.; Tracey, Debra C.

    1994-01-01

    The Hydrologic lnstrumentation Facility (HIF) of the U.S. Geological Survey (USGS) has nationwide responsibility for all aspects of hydrologic field instrumentation in support of Survey data-collection programs. Each year the HIF publishes a report to inform Water Resources Division (WRD) personnel of progress made by the HIF in fulfilling its mission to improve instrumentation services to the Division. The report for fiscal year 1993 (FY93) describes the activities of the HIF, including major accomplish- ments for the year; personnel actions; active projects (reported by section--Technical Services Section, Administrative Services Section, Field Coordination, Applications and Development Section, Test and Evaluation Section, Field Service and Supply Section); and planned activities for the coming year. Also presented in the appendixes are detailed listings of the memberships of the Instrumentation Committee and the Instrumentation Technical Advisory Subcommittee; district, sub- district, and field office visits by HIF personnel; professional and technical meetings attended by HIF personnel; vendor visits; and reports prepared by HIF personnel.

  18. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  19. Metropolitan Spokane Region Water Resources Study. Appendix 1. Institutional Analysis

    DTIC Science & Technology

    1976-01-01

    projects in the State of Washington. -It- h"Ithe- ath- -ority to require compliance from all local... projects of relatively modest scope. -rojec- financ- ing is based, as in the case of irrigation districts, on assessments lev- ied on district lands. The ...treatment -facilities would be phased out at that time. The other interim facilities all west of Five Mile Prairie are projected to remain in service

  20. Optimizing charge breeding techniques for ISOL facilities in Europe: Conclusions from the EMILIE project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delahaye, P., E-mail: delahaye@ganil.fr; Jardin, P.; Maunoury, L.

    The present paper summarizes the results obtained from the past few years in the framework of the Enhanced Multi-Ionization of short-Lived Isotopes for Eurisol (EMILIE) project. The EMILIE project aims at improving the charge breeding techniques with both Electron Cyclotron Resonance Ion Sources (ECRIS) and Electron Beam Ion Sources (EBISs) for European Radioactive Ion Beam (RIB) facilities. Within EMILIE, an original technique for debunching the beam from EBIS charge breeders is being developed, for making an optimal use of the capabilities of CW post-accelerators of the future facilities. Such a debunching technique should eventually resolve duty cycle and time structuremore » issues which presently complicate the data-acquisition of experiments. The results of the first tests of this technique are reported here. In comparison with charge breeding with an EBIS, the ECRIS technique had lower performance in efficiency and attainable charge state for metallic ion beams and also suffered from issues related to beam contamination. In recent years, improvements have been made which significantly reduce the differences between the two techniques, making ECRIS charge breeding more attractive especially for CW machines producing intense beams. Upgraded versions of the Phoenix charge breeder, originally developed by LPSC, will be used at SPES and GANIL/SPIRAL. These two charge breeders have benefited from studies undertaken within EMILIE, which are also briefly summarized here.« less

  1. 14 CFR Appendix H to Part 121 - Advanced Simulation

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Advanced Simulation H Appendix H to Part... Simulation Link to an amendment published at 78 FR 67846, Nov. 12, 2013. This appendix provides guidelines... Simulation Training Program For an operator to conduct Level C or D training under this appendix all required...

  2. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  3. Coal gasification systems engineering and analysis. Appendix C: Alternate product facility designs

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The study of the production of methane, methanol, gasoline, and hydrogen by an add-on facility to a Koppers-Totzek based MBG plant is presented. Applications to a Texaco facility are inferred by evaluation of delta effects from the K-T cases. The production of methane from an add-on facility to a Lurgi based MBG plant and the co-production of methane and methanol from a Lurgi based system is studied. Studies are included of the production of methane from up to 50 percent of the MBG produced in an integrated K-T based plant and the production of methane from up to 50 percent of the MBG produced from an integrated plant in which module 1 is based on K-T technology and modules 2, 3, and 4 are based on Texaco technology.

  4. 12 CFR Appendix A to Part 704 - Model Forms

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Model Forms A Appendix A to Part 704 Banks and... Pt. 704, App. A Appendix A to Part 704—Model Forms This appendix contains sample forms intended for... corporate credit union. (8) Paid-in capital is perpetual maturity and noncumulative dividend. I have read...

  5. 12 CFR Appendix A to Part 704 - Model Forms

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Model Forms A Appendix A to Part 704 Banks and... Pt. 704, App. A Appendix A to Part 704—Model Forms This appendix contains sample forms intended for... corporate credit union. (8) Paid-in capital is perpetual maturity and noncumulative dividend. I have read...

  6. 14 CFR Appendix C to Part 125 - Ice Protection

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Ice Protection C Appendix C to Part 125... OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Pt. 125, App. C Appendix C to Part 125... conditions as described in appendix C of part 25 of this chapter. (c) Compliance with all or portions of this...

  7. 29 CFR Appendix A to Subpart X of... - Ladders

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Stairways and Ladders Pt. 1926, Subpt. X, App. A Appendix A to Subpart X of Part 1926—Ladders This appendix serves as a non-mandatory guideline to assist...

  8. 29 CFR Appendix A to Subpart X of... - Ladders

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Stairways and Ladders Pt. 1926, Subpt. X, App. A Appendix A to Subpart X of Part 1926—Ladders This appendix serves as a non-mandatory guideline to assist...

  9. 29 CFR Appendix A to Subpart X of... - Ladders

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Stairways and Ladders Pt. 1926, Subpt. X, App. A Appendix A to Subpart X of Part 1926—Ladders This appendix serves as a non-mandatory guideline to assist...

  10. 29 CFR Appendix A to Subpart X of... - Ladders

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Stairways and Ladders Pt. 1926, Subpt. X, App. A Appendix A to Subpart X of Part 1926—Ladders This appendix serves as a non-mandatory guideline to assist...

  11. 29 CFR Appendix A to Subpart X of... - Ladders

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Stairways and Ladders Pt. 1926, Subpt. X, App. A Appendix A to Subpart X of Part 1926—Ladders This appendix serves as a non-mandatory guideline to assist...

  12. 49 CFR Appendixes C-E to... - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false [Reserved] C Appendixes C-E to Subchapter B of Chapter III Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS Appendixes C...

  13. 49 CFR Appendixes C-E to... - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false [Reserved] C Appendixes C-E to Subchapter B of Chapter III Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS Appendixes C...

  14. Facilities for US Radioastronomy.

    ERIC Educational Resources Information Center

    Thaddeus, Patrick

    1982-01-01

    Discusses major developments in radioastronomy since 1945. Topics include proposed facilities, very-long-baseline interferometric array, millimeter-wave telescope, submillimeter-wave telescope, and funding for radioastronomy facilities and projects. (JN)

  15. Empowering Facilities Teams through Technology

    ERIC Educational Resources Information Center

    Cormier, Scott

    2013-01-01

    Facilities departments at colleges and universities are facing the same challenge: how not to do just the most projects, but also the right projects with the limited funds they are given. In order to make the best decisions, they need more control over the capital planning process, which requires accurate, current facility condition data. Each…

  16. 40 CFR 60.1245 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... appendix F requirements to evaluate continuous emission monitoring systems? 60.1245 Section 60.1245... appendix F requirements to evaluate continuous emission monitoring systems? Yes, the accuracy tests for your sulfur dioxide continuous emission monitoring system require you to also evaluate your oxygen (or...

  17. 40 CFR 60.1245 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appendix F requirements to evaluate continuous emission monitoring systems? 60.1245 Section 60.1245... appendix F requirements to evaluate continuous emission monitoring systems? Yes, the accuracy tests for your sulfur dioxide continuous emission monitoring system require you to also evaluate your oxygen (or...

  18. 40 CFR 60.1245 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... appendix F requirements to evaluate continuous emission monitoring systems? 60.1245 Section 60.1245... Commenced After June 6, 2001 Continuous Emission Monitoring § 60.1245 Am I exempt from any appendix B or... carbon dioxide) continuous emission monitoring system. Therefore, your oxygen (or carbon dioxide...

  19. 40 CFR Appendix A to Part 66 - Technical Support Document

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Technical Support Document A Appendix A to Part 66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...—Technical Support Document Note: For text of appendix A see appendix A to part 67. ...

  20. 41 CFR Appendix to Subchapter H... - Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Reserved to Appendix to Subchapter H-Temporary Regulations Public Contracts and Property Management Federal Property Management... (FMR) (41 CFR chapter 102, parts 102-1 through 102-220). Appendix to Subchapter H—Temporary Regulations...

  1. Complementary and Integrative Healthcare in a Long-term Care Facility: A Pilot Project.

    PubMed

    Evans, Roni; Vihstadt, Corrie; Westrom, Kristine; Baldwin, Lori

    2015-01-01

    The world's population is aging quickly, leading to increased challenges of how to care for individuals who can no longer independently care for themselves. With global social and economic pressures leading to declines in family support, increased reliance is being placed on community- and government-based facilities to provide long-term care (LTC) for many of society's older citizens. Complementary and integrative healthcare (CIH) is commonly used by older adults and may offer an opportunity to enhance LTC residents' wellbeing. Little work has been done, however, rigorously examining the safety and effectiveness of CIH for LTC residents. The goal of this work is to describe a pilot project to develop and evaluate one model of CIH in an LTC facility in the Midwestern United States. A prospective, mixed-methods pilot project was conducted in two main phases: (1) preparation and (2) implementation and evaluation. The preparation phase entailed assessment, CIH model design and development, and training. A CIH model including acupuncture, chiropractic, and massage therapy, guided by principles of collaborative integration, evidence informed practice, and sustainability, was applied in the implementation and evaluation phase. CIH services were provided for 16 months in the LTC facility. Quantitative data collection included pain, quality of life, and adverse events. Qualitative interviews of LTC residents, their family members, and LTC staff members queried perceptions of CIH services. A total of 46 LTC residents received CIH care, most commonly for musculoskeletal pain (61%). Participants were predominantly female (85%) and over the age of 80 years (67%). The median number of CIH treatments was 13, with a range of 1 to 92. Residents who were able to provide self-report data demonstrated, on average, a 15% decline in pain and a 4% improvement in quality of life. No serious adverse events related to treatment were documented; the most common mild and expected side effect

  2. 48 CFR Appendix E to Chapter 7 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false [Reserved] E Appendix E to Chapter 7 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT Appendix E to Chapter 7 [Reserved] ...

  3. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    DTIC Science & Technology

    2017-01-01

    fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund

  4. 49 CFR Appendix A to Part 227 - Noise Exposure Computation

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Noise Exposure Computation A Appendix A to Part... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OCCUPATIONAL NOISE EXPOSURE Pt. 227, App. A Appendix A to Part 227—Noise Exposure Computation This appendix is mandatory. I. Computation of Employee Noise Exposure A...

  5. 49 CFR Appendix A to Part 227 - Noise Exposure Computation

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Noise Exposure Computation A Appendix A to Part... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OCCUPATIONAL NOISE EXPOSURE Pt. 227, App. A Appendix A to Part 227—Noise Exposure Computation This appendix is mandatory. I. Computation of Employee Noise Exposure A...

  6. 29 CFR (non-Mandatory) Appendix B... - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false [Reserved] Appendix (Non-mandatory) Appendix B to Subpart L of Part 1926-Criteria for Determining the Feasibility of Providing Safe Access and Fall Protection... Feasibility of Providing Safe Access and Fall Protection for Scaffold Erectors and Dismantlers [Reserved] ...

  7. 29 CFR (non-Mandatory) Appendix B... - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false [Reserved] Appendix (Non-mandatory) Appendix B to Subpart L of Part 1926-Criteria for Determining the Feasibility of Providing Safe Access and Fall Protection... Feasibility of Providing Safe Access and Fall Protection for Scaffold Erectors and Dismantlers [Reserved] ...

  8. 29 CFR (non-Mandatory) Appendix B... - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false [Reserved] Appendix (Non-mandatory) Appendix B to Subpart L of Part 1926-Criteria for Determining the Feasibility of Providing Safe Access and Fall Protection... Feasibility of Providing Safe Access and Fall Protection for Scaffold Erectors and Dismantlers [Reserved] ...

  9. 10 CFR Appendix II to Part 504 - Fuel Price Computation

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Fuel Price Computation II Appendix II to Part 504 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS EXISTING POWERPLANTS Pt. 504, App. II Appendix II to Part 504—Fuel Price Computation (a) Introduction. This appendix provides the equations and parameters...

  10. 31 CFR Appendix C to Part 560 - Eligible Procurement Bodies

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Eligible Procurement Bodies C Appendix C to Part 560 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued..., App. C Appendix C to Part 560—Eligible Procurement Bodies This Appendix C sets forth eligible...

  11. 49 CFR Appendix B to Part 24 - Statistical Report Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Statistical Report Form B Appendix B to Part 24... ACQUISITION FOR FEDERAL AND FEDERALLY-ASSISTED PROGRAMS Pt. 24, App. B Appendix B to Part 24—Statistical Report Form This Appendix sets forth the statistical information collected from Agencies in accordance...

  12. 29 CFR Appendix B to Part 70 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false [Reserved] B Appendix B to Part 70 Labor Office of the Secretary of Labor PRODUCTION OR DISCLOSURE OF INFORMATION OR MATERIALS Appendix B to Part 70 [Reserved] ...

  13. 29 CFR Appendix B to Part 70 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false [Reserved] B Appendix B to Part 70 Labor Office of the Secretary of Labor PRODUCTION OR DISCLOSURE OF INFORMATION OR MATERIALS Appendix B to Part 70 [Reserved] ...

  14. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false [Reserved] G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2 [Reserved] ...

  15. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false [Reserved] G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2 [Reserved] ...

  16. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false [Reserved] G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2 [Reserved] ...

  17. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false [Reserved] G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2 [Reserved] ...

  18. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false [Reserved] G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2 [Reserved] ...

  19. Appendix E: Supplemental Risk Management Program Guidance for Ammonia Refrigeration Facilities

    EPA Pesticide Factsheets

    Additional information for food processors, food distributors, refrigerated warehouses, and any other facility that has an ammonia refrigeration system. Includes details on exemption for farms, threshold quantity, and offsite consequence analysis.

  20. 32 CFR Appendix B to Part 275 - Obtaining Customer Authorization

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Obtaining Customer Authorization B Appendix B to... OF 1978 Pt. 275, App. B Appendix B to Part 275—Obtaining Customer Authorization A. A DoD law... feasible, obtain the customer's consent. B. Any authorization obtained under paragraph A. of this appendix...

  1. 10 CFR Appendix C to Part 2 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] C Appendix C to Part 2 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Appendix C to Part 2 [Reserved] ...

  2. 10 CFR Appendix A to Part 2 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] A Appendix A to Part 2 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Appendix A to Part 2 [Reserved] ...

  3. 10 CFR Appendix C to Part 2 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false [Reserved] C Appendix C to Part 2 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Appendix C to Part 2 [Reserved] ...

  4. 17 CFR Appendix C to Part 145 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 1 2011-04-01 2011-04-01 false [Reserved] C Appendix C to Part 145 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION COMMISSION RECORDS AND INFORMATION Appendix C to Part 145 [Reserved] ...

  5. 40 CFR Appendix X to Part 268 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false [Reserved] X Appendix X to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix X to Part 268 [Reserved] ...

  6. 40 CFR Appendix X to Part 268 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false [Reserved] X Appendix X to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix X to Part 268 [Reserved] ...

  7. 40 CFR Appendix X to Part 268 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false [Reserved] X Appendix X to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix X to Part 268 [Reserved] ...

  8. 40 CFR Appendix X to Part 268 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false [Reserved] X Appendix X to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix X to Part 268 [Reserved] ...

  9. 40 CFR Appendix X to Part 268 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false [Reserved] X Appendix X to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix X to Part 268 [Reserved] ...

  10. 16 CFR Appendix B to Part 698 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false [Reserved] B Appendix B to Part 698 Commercial Practices FEDERAL TRADE COMMISSION THE FAIR CREDIT REPORTING ACT MODEL FORMS AND DISCLOSURES Appendix B to Part 698 [Reserved] ...

  11. 40 CFR Appendix V to Part 268 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false [Reserved] V Appendix V to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix V to Part 268 [Reserved] ...

  12. 40 CFR Appendix V to Part 268 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false [Reserved] V Appendix V to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix V to Part 268 [Reserved] ...

  13. 40 CFR Appendix V to Part 268 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false [Reserved] V Appendix V to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix V to Part 268 [Reserved] ...

  14. 40 CFR Appendix V to Part 268 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false [Reserved] V Appendix V to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix V to Part 268 [Reserved] ...

  15. 40 CFR Appendix V to Part 268 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false [Reserved] V Appendix V to Part 268 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) LAND DISPOSAL RESTRICTIONS Appendix V to Part 268 [Reserved] ...

  16. 14 CFR Appendix A to Part 1215 - Estimated Service Rates in 1997 Dollars for TDRSS Standard Services (Based on NASA Escalation...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Services (Based on NASA Escalation Estimate) Time: Project conceptualization (at least two years before... TDRSS Standard Services (Based on NASA Escalation Estimate) A Appendix A to Part 1215 Aeronautics and... the service requirements by NASA Headquarters, communications for the reimbursable development of a...

  17. 14 CFR Appendix A to Part 1215 - Estimated Service Rates in 1997 Dollars for TDRSS Standard Services (Based on NASA Escalation...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Services (Based on NASA Escalation Estimate) Time: Project conceptualization (at least two years before... TDRSS Standard Services (Based on NASA Escalation Estimate) A Appendix A to Part 1215 Aeronautics and... the service requirements by NASA Headquarters, communications for the reimbursable development of a...

  18. 10 CFR Appendix G to Part 73 - Reportable Safeguards Events

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Reportable Safeguards Events G Appendix G to Part 73.... G Appendix G to Part 73—Reportable Safeguards Events Pursuant to the provisions of 10 CFR 73.71 (b.... (b) Any other threatened, attempted, or committed act not previously defined in appendix G with the...

  19. 10 CFR Appendix G to Part 73 - Reportable Safeguards Events

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Reportable Safeguards Events G Appendix G to Part 73.... G Appendix G to Part 73—Reportable Safeguards Events Pursuant to the provisions of 10 CFR 73.71 (b.... (b) Any other threatened, attempted, or committed act not previously defined in appendix G with the...

  20. 10 CFR Appendix G to Part 73 - Reportable Safeguards Events

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Reportable Safeguards Events G Appendix G to Part 73.... G Appendix G to Part 73—Reportable Safeguards Events Pursuant to the provisions of 10 CFR 73.71 (b.... (b) Any other threatened, attempted, or committed act not previously defined in appendix G with the...

  1. 10 CFR Appendix G to Part 73 - Reportable Safeguards Events

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Reportable Safeguards Events G Appendix G to Part 73.... G Appendix G to Part 73—Reportable Safeguards Events Pursuant to the provisions of 10 CFR 73.71 (b.... (b) Any other threatened, attempted, or committed act not previously defined in appendix G with the...

  2. 10 CFR Appendix D to Part 835 - Surface Contamination Values

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Surface Contamination Values D Appendix D to Part 835 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Pt. 835, App. D Appendix D to Part 835—Surface Contamination Values The data presented in appendix D are to be used in identifying the need for...

  3. 10 CFR Appendix D to Part 835 - Surface Contamination Values

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Surface Contamination Values D Appendix D to Part 835 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Pt. 835, App. D Appendix D to Part 835—Surface Contamination Values The data presented in appendix D are to be used in identifying the need for...

  4. 10 CFR Appendix D to Part 835 - Surface Contamination Values

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Surface Contamination Values D Appendix D to Part 835 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Pt. 835, App. D Appendix D to Part 835—Surface Contamination Values The data presented in appendix D are to be used in identifying the need for...

  5. 32 CFR Appendix D to Part 282 - Processing a Claim

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Processing a Claim D Appendix D to Part 282.... 282, App. D Appendix D to Part 282—Processing a Claim (a) Initial Component Processing. Upon receipt... apply for a waiver. (Paragraph (d) of this Appendix explains which claims qualify and the procedures for...

  6. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  7. 29 CFR Appendix B to Subpart Y of... - Guidelines for Scientific Diving

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Guidelines for Scientific Diving B Appendix B to Subpart Y..., Subpt. Y, App. B Appendix B to Subpart Y of Part 1926—Guidelines for Scientific Diving Note: The requirements applicable to construction work under this appendix B are identical to those set forth at appendix...

  8. 29 CFR Appendix B to Subpart Y of... - Guidelines for Scientific Diving

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Guidelines for Scientific Diving B Appendix B to Subpart Y..., Subpt. Y, App. B Appendix B to Subpart Y of Part 1926—Guidelines for Scientific Diving Note: The requirements applicable to construction work under this appendix B are identical to those set forth at appendix...

  9. 40 CFR Appendix F to Part 58 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false [Reserved] F Appendix F to Part 58 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Appendix F to Part 58 [Reserved] ...

  10. 40 CFR Appendix B to Part 58 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false [Reserved] B Appendix B to Part 58 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Appendix B to Part 58 [Reserved] ...

  11. 49 CFR Appendix C to Part 213 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false [Reserved] C Appendix C to Part 213 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS Appendix C to Part 213[Reserved] ...

  12. 40 CFR Appendix C of Subpart A- - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 18 2014-07-01 2014-07-01 false [Reserved] C Appendix C of Subpart A- Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF... controlled substances. Appendix C of Subpart A—[Reserved] ...

  13. 17 CFR Appendix C to Part 40 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 1 2011-04-01 2011-04-01 false [Reserved] C Appendix C to Part 40 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION PROVISIONS COMMON TO REGISTERED ENTITIES Appendix C to Part 40 [Reserved] ...

  14. 12 CFR Appendix D to Part 41 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false [Reserved] D Appendix D to Part 41 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY FAIR CREDIT REPORTING Appendix D to Part 41[Reserved] ...

  15. Summary of operations and performance of the Murdock site restoration project in 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of amore » small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A

  16. 14 CFR Appendix N to Part 121 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false [Reserved] N Appendix N to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Appendix N to Part 121 [Reserved] ...

  17. 49 CFR Appendix G to Part 229 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false [Reserved] G Appendix G to Part 229 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Appendix G to Part 229 [Reserved] ...

  18. 49 CFR Appendix G to Part 229 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false [Reserved] G Appendix G to Part 229 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Appendix G to Part 229 [Reserved] ...

  19. 49 CFR Appendix G to Part 229 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false [Reserved] G Appendix G to Part 229 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Appendix G to Part 229 [Reserved] ...

  20. 40 CFR Appendix III to Part 261 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false [Reserved] III Appendix III to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION AND LISTING OF HAZARDOUS WASTE Appendix III to Part 261 [Reserved] ...

  1. 40 CFR Appendix II to Part 261 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false [Reserved] II Appendix II to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION AND LISTING OF HAZARDOUS WASTE Appendix II to Part 261 [Reserved] ...

  2. 14 CFR Appendix N to Part 121 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false [Reserved] N Appendix N to Part 121 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Appendix N to Part 121 [Reserved] ...

  3. 49 CFR Appendix C to Part 238 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false [Reserved] C Appendix C to Part 238 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Appendix C to Part 238 [Reserved] ...

  4. 17 CFR Appendix C to Part 1 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false [Reserved] C Appendix C to Part 1 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION GENERAL REGULATIONS UNDER THE COMMODITY EXCHANGE ACT Appendix C to Part 1 [Reserved] ...

  5. 14 CFR Appendix C to Part 43 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false [Reserved] C Appendix C to Part 43 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT MAINTENANCE, PREVENTIVE MAINTENANCE, REBUILDING, AND ALTERATION Appendix C to Part 43 [Reserved] ...

  6. 14 CFR Appendix C to Part 43 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false [Reserved] C Appendix C to Part 43 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT MAINTENANCE, PREVENTIVE MAINTENANCE, REBUILDING, AND ALTERATION Appendix C to Part 43 [Reserved] ...

  7. 49 CFR Appendix C to Part 238 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false [Reserved] C Appendix C to Part 238 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Appendix C to Part 238 [Reserved] ...

  8. 12 CFR Appendix D to Part 334 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false [Reserved] D Appendix D to Part 334 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FAIR CREDIT REPORTING Appendix D to Part 334 [Reserved] ...

  9. 14 CFR Appendix C to Part 43 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false [Reserved] C Appendix C to Part 43 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT MAINTENANCE, PREVENTIVE MAINTENANCE, REBUILDING, AND ALTERATION Appendix C to Part 43 [Reserved] ...

  10. 14 CFR Appendix H to Part 417 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false [Reserved] H Appendix H to Part 417 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Appendix H to Part 417 [Reserved] ...

  11. Phased Demolition of an Occupied Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brede, Lawrence M.; Lauterbach, Merl J.; Witt, Brandon W.

    2008-01-15

    The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015more » m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were

  12. 29 CFR Appendix A to Subpart P of... - Soil Classification

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Soil Classification A Appendix A to Subpart P of Part 1926..., App. A Appendix A to Subpart P of Part 1926—Soil Classification (a) Scope and application—(1) Scope. This appendix describes a method of classifying soil and rock deposits based on site and environmental...

  13. 29 CFR Appendix A to Subpart P of... - Soil Classification

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Soil Classification A Appendix A to Subpart P of Part 1926..., App. A Appendix A to Subpart P of Part 1926—Soil Classification (a) Scope and application—(1) Scope. This appendix describes a method of classifying soil and rock deposits based on site and environmental...

  14. 29 CFR Appendix A to Subpart P of... - Soil Classification

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Soil Classification A Appendix A to Subpart P of Part 1926..., App. A Appendix A to Subpart P of Part 1926—Soil Classification (a) Scope and application—(1) Scope. This appendix describes a method of classifying soil and rock deposits based on site and environmental...

  15. 29 CFR Appendix A to Subpart P of... - Soil Classification

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Soil Classification A Appendix A to Subpart P of Part 1926..., App. A Appendix A to Subpart P of Part 1926—Soil Classification (a) Scope and application—(1) Scope. This appendix describes a method of classifying soil and rock deposits based on site and environmental...

  16. 12 CFR Appendix B to Part 202 - Model Application Forms

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 2 2014-01-01 2014-01-01 false Model Application Forms B Appendix B to Part... CREDIT OPPORTUNITY ACT (REGULATION B) Pt. 202, App. B Appendix B to Part 202—Model Application Forms 1... appear on the creditor's form. 3. If a creditor uses an appropriate Appendix B model form, or modifies a...

  17. 50 CFR Appendix C to Part 622 - Fish Length Measurements

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Fish Length Measurements C Appendix C to Part 622 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC... Appendix C to Part 622—Fish Length Measurements ER03JY96.000 Figure 1 of Appendix C to Part 622—Carapace...

  18. 50 CFR Appendix C to Part 622 - Fish Length Measurements

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Fish Length Measurements C Appendix C to Part 622 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC... Appendix C to Part 622—Fish Length Measurements ER03JY96.000 Figure 1 of Appendix C to Part 622—Carapace...

  19. 50 CFR Appendix C to Part 622 - Fish Length Measurements

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Fish Length Measurements C Appendix C to Part 622 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC... Appendix C to Part 622—Fish Length Measurements ER03JY96.000 Figure 1 of Appendix C to Part 622—Carapace...

  20. 12 CFR Appendix C to Part 202 - Sample Notification Forms

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 2 2011-01-01 2011-01-01 false Sample Notification Forms C Appendix C to Part... CREDIT OPPORTUNITY ACT (REGULATION B) Pt. 202, App. C Appendix C to Part 202—Sample Notification Forms 1. This appendix contains ten sample notification forms. Forms C-1 through C-4 are intended for use in...

  1. 12 CFR Appendix C to Part 202 - Sample Notification Forms

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 2 2014-01-01 2014-01-01 false Sample Notification Forms C Appendix C to Part... CREDIT OPPORTUNITY ACT (REGULATION B) Pt. 202, App. C Appendix C to Part 202—Sample Notification Forms 1. This appendix contains ten sample notification forms. Forms C-1 through C-4 are intended for use in...

  2. Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jerel G.; Kruzic, Michael; Castillo, Carlos

    2013-07-01

    Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing ofmore » facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)« less

  3. Hot Corrosion Test Facility at the NASA Lewis Special Projects Laboratory

    NASA Technical Reports Server (NTRS)

    Robinson, Raymond C.; Cuy, Michael D.

    1994-01-01

    The Hot Corrosion Test Facility (HCTF) at the NASA Lewis Special Projects Laboratory (SPL) is a high-velocity, pressurized burner rig currently used to evaluate the environmental durability of advanced ceramic materials such as SiC and Si3N4. The HCTF uses laboratory service air which is preheated, mixed with jet fuel, and ignited to simulate the conditions of a gas turbine engine. Air, fuel, and water systems are computer-controlled to maintain test conditions which include maximum air flows of 250 kg/hr (550 lbm/hr), pressures of 100-600 kPa (1-6 atm), and gas temperatures exceeding 1500 C (2732 F). The HCTF provides a relatively inexpensive, yet sophisticated means for researchers to study the high-temperature oxidation of advanced materials, and the injection of a salt solution provides the added capability of conducting hot corrosion studies.

  4. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  5. Environmental Effects of Tennessee-Tombigbee Project Cutoff Bendways.

    DTIC Science & Technology

    1982-08-01

    Congdon 1971, Barton et al. 1972, King and Carlander 1976). The most signifi- cant result of a study of two cutoff bendways on the Lower Alabama River...34Statewide Lake and Stream Survey: Completion Report Appendix," Mississippi Game and Fish Commission Project F-8-R, Jackson, Miss. Congdon , James C. 1971

  6. 40 CFR Appendix E to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] E Appendix E to Part 50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS NATIONAL PRIMARY AND SECONDARY AMBIENT AIR QUALITY STANDARDS Appendix E to Part 50 [Reserved] ...

  7. 32 CFR Appendix G to Part 154 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false [Reserved] G Appendix G to Part 154 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Appendix G to Part 154 [Reserved] ...

  8. 32 CFR Appendix G to Part 154 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false [Reserved] G Appendix G to Part 154 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Appendix G to Part 154 [Reserved] ...

  9. 32 CFR Appendix G to Part 154 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false [Reserved] G Appendix G to Part 154 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Appendix G to Part 154 [Reserved] ...

  10. 32 CFR Appendix G to Part 154 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false [Reserved] G Appendix G to Part 154 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Appendix G to Part 154 [Reserved] ...

  11. 32 CFR Appendix G to Part 154 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false [Reserved] G Appendix G to Part 154 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Appendix G to Part 154 [Reserved] ...

  12. 40 CFR Appendix M to Part 50 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false [Reserved] M Appendix M to Part 50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS NATIONAL PRIMARY AND SECONDARY AMBIENT AIR QUALITY STANDARDS Appendix M to Part 50 [Reserved] ...

  13. 40 CFR Appendix M to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false [Reserved] M Appendix M to Part 50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS NATIONAL PRIMARY AND SECONDARY AMBIENT AIR QUALITY STANDARDS Appendix M to Part 50 [Reserved] ...

  14. 40 CFR Appendix E to Part 60 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 7 2010-07-01 2010-07-01 true [Reserved] E Appendix E to Part 60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES (CONTINUED) Appendix E to Part 60 [Reserved] ...

  15. 49 CFR Appendix C to Part 228 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false [Reserved] C Appendix C to Part 228 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Appendix C...

  16. 49 CFR Appendix C to Part 228 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false [Reserved] C Appendix C to Part 228 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Appendix C...

  17. 40 CFR Appendix H to Part 60 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 7 2010-07-01 2010-07-01 true [Reserved] H Appendix H to Part 60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES (CONTINUED) Appendix H to Part 60 [Reserved] ...

  18. Variation in infection prevention practices in dialysis facilities: results from the national opportunity to improve infection control in ESRD (End-Stage Renal Disease) project.

    PubMed

    Chenoweth, Carol E; Hines, Stephen C; Hall, Kendall K; Saran, Rajiv; Kalbfleisch, John D; Spencer, Teri; Frank, Kelly M; Carlson, Diane; Deane, Jan; Roys, Erik; Scholz, Natalie; Parrotte, Casey; Messana, Joseph M

    2015-07-01

    OBJECTIVE To observe patient care across hemodialysis facilities enrolled in the National Opportunity to Improve Infection Control in ESRD (end-stage renal disease) (NOTICE) project in order to evaluate adherence to evidence-based practices aimed at prevention of infection. SETTING AND PARTICIPANTS Thirty-four hemodialysis facilities were randomly selected from among 772 facilities in 4 end-stage renal disease participating networks. Facility selection was stratified on dialysis organization affiliation, size, socioeconomic status, and urban/rural status. MEASUREMENTS Trained infection control evaluators used an infection control worksheet to observe 73 distinct infection control practices at the hemodialysis facilities, from October 1, 2011, through January 31, 2012. RESULTS There was considerable variation in infection control practices across enrolled facilities. Overall adherence to recommended practices was 68% (range, 45%-92%) across all facilities. Overall adherence to expected hand hygiene practice was 72% (range, 10%-100%). Compliance to hand hygiene before and after procedures was high; however, during procedures hand hygiene compliance averaged 58%. Use of chlorhexidine as the specific agent for exit site care was 19% overall but varied from 0% to 35% by facility type. The 8 checklists varied in the frequency of perfect performance from 0% for meeting every item on the checklist for disinfection practices to 22% on the arteriovenous access practices at initiation. CONCLUSIONS Our findings suggest that there are many areas for improvement in hand hygiene and other infection prevention practices in end-stage renal disease. These NOTICE project findings will help inform the development of a larger quality improvement initiative at dialysis facilities.

  19. 49 CFR Appendix C to Part 21 - Application of Part 21 to Certain Federal Financial Assistance of the Department of Transportation

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... to, construction, planning, research, highway safety, engineering, property management, and fee...

  20. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUECK, K.J.

    2004-10-18

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less

  1. 14 CFR Appendix to Part 1275 - Research Misconduct

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Research Misconduct Appendix to Part 1275 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT Pt. 1275, App. Appendix to Part 1275—Research Misconduct NASA Research Disciplines and Respective Associated Directorates...

  2. 14 CFR Appendix to Part 1275 - Research Misconduct

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Research Misconduct Appendix to Part 1275 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT Pt. 1275, App. Appendix to Part 1275—Research Misconduct NASA Research Disciplines and Respective Associated Directorates...

  3. 40 CFR Appendix V to Part 261 - Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Reserved V Appendix V to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION... Materials Wording of the instruments. Appendix V to Part 261 [Reserved for Infectious Waste Treatment...

  4. 40 CFR Appendix V to Part 261 - Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Reserved V Appendix V to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION... Materials Wording of the instruments. Appendix V to Part 261 [Reserved for Infectious Waste Treatment...

  5. 40 CFR Appendix V to Part 261 - Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Reserved V Appendix V to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION... Materials Wording of the instruments. Appendix V to Part 261 [Reserved for Infectious Waste Treatment...

  6. 40 CFR Appendix F to Part 403 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true [Reserved] F Appendix F to Part 403 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PRETREATMENT REGULATIONS FOR EXISTING AND NEW SOURCES OF POLLUTION Appendix F to Part 403...

  7. 40 CFR Appendix V to Part 261 - Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Reserved V Appendix V to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION... Materials Wording of the instruments. Appendix V to Part 261 [Reserved for Infectious Waste Treatment...

  8. 40 CFR Appendix V to Part 261 - Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Reserved V Appendix V to Part 261 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) IDENTIFICATION... Materials Wording of the instruments. Appendix V to Part 261 [Reserved for Infectious Waste Treatment...

  9. 7 CFR Appendix B to Part 225 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false [Reserved] B Appendix B to Part 225 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM Appendix B to Part 225 [Reserved...

  10. 14 CFR Appendix B to Part 23 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false [Reserved] B Appendix B to Part 23 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Appendix B to Part 23 [Reserved] ...

  11. 49 CFR Appendix B - Form Federal Register Notice

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Form Federal Register Notice B APPENDIX B Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT.... Pt. 1155, App. B APPENDIX B—Form Federal Register Notice Docket No. FD ____ (Sub-No. ____) Notice of...

  12. 33 CFR Appendix B to Part 230 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false [Reserved] B Appendix B to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Appendix B to Part 230 [Reserved] ...

  13. 33 CFR Appendix B to Part 230 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false [Reserved] B Appendix B to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Appendix B to Part 230 [Reserved] ...

  14. 40 CFR Appendix to Part 243 - Recommended Bibliography

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Recommended Bibliography Appendix to Part 243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES.... Appendix to Part 243—Recommended Bibliography 1. American National Standard Z245.1. Safety standard for...

  15. 7 CFR Appendix B to Part 225 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false [Reserved] B Appendix B to Part 225 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM Appendix B to Part 225 [Reserved] ...

  16. 7 CFR Appendix B to Part 225 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false [Reserved] B Appendix B to Part 225 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM Appendix B to Part 225 [Reserved] ...

  17. 7 CFR Appendix B to Part 225 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false [Reserved] B Appendix B to Part 225 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM Appendix B to Part 225 [Reserved] ...

  18. 7 CFR Appendix B to Part 225 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false [Reserved] B Appendix B to Part 225 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM Appendix B to Part 225 [Reserved] ...

  19. 40 CFR Appendix H to Part 75... - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false [Reserved] H Appendix H to Part 75-Revised Traceability Protocol No. 1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Appendix H to Part 75—Revised Traceability...

  20. 14 CFR Appendix E to Part 23 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false [Reserved] E Appendix E to Part 23 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Appendix E to Part 23 [Reserved] ...