Sample records for facility project definition

  1. National Biomedical Tracer Facility: Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heaton, R.; Peterson, E.; Smith, P.

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPFmore » to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.« less

  2. Purdue University National Biomedical Tracer Facility: Project definition phase. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, M.A.

    The proposed National Biomedical Tracer Facility (NBTF) will house a high-current accelerator dedicated to production of short-lived radionuclides for biomedical and scientific research. The NBTF will play a vital role in repairing and maintaining the United States` research infrastructure for generation of essential accelerator-based radioisotopes. If properly designed and managed, the NBTF should also achieve international recognition as a Center-of-Excellence for research on radioisotope production methods and for associated education and training. The current report documents the results of a DOE-funded NBTF Project Definition Phase study carried out to better define the technical feasibility and projected costs of establishing andmore » operating the NBTF. This report provides an overview of recommended Facility Design and Specifications, including Accelerator Design, Building Design, and the associated Construction Cost Estimates and Schedule. It is recommended that the NBTF be established as an integrated, comprehensive facility for meeting the diverse production, research, and educational missions set forth in previous documents. Based on an analysis of the projected production demands that will be placed on the NBTF, it appears that a 70 MeV, 1 mA, negative ion cyclotron will offer a good balance between production capabilities and the costs of accelerator purchase and operation. A preliminary architectural plan is presented for a facility designed specifically to fulfill the functions of the NBTF in a cost-effective manner. This report also presents a detailed analysis of the Required Federal State, and Local Permits that may be needed to establish the NBTF, along with schedules and cost estimates for obtaining these permits. The Handling, Storage, and Disposal of Radioactive Waste will pose some significant challenges in the operation of the NBTF, but at this stage of planning the associated problems do not appear to be prohibitive.« less

  3. Space Station Furnace Facility. Volume 2: Requirements definition and conceptual design study

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Space Station Freedom Furnace (SSFF) Project is divided into two phases: phase 1, a definition study phase, and phase 2, a design and development phase. TBE was awarded a research study entitled, 'Space Station Furnace Facility Requirements Definition and Conceptual Design Study' on June 2, 1989. This report addresses the definition study phase only. Phase 2 is to be complete after completion of phase 1. The contract encompassed a requirements definition study and culminated in hardware/facility conceptual designs and hardware demonstration development models to test these conceptual designs. The study was divided into two parts. Part 1 (the basic part of the effort) encompassed preliminary requirements definition and assessment; conceptional design of the SSFF Core; fabrication of mockups; and preparation for the support of a conceptional design review (CoDR). Part 2 (the optional part of the effort) included detailed definition of the engineering and design requirements, as derived from the science requirements; refinement of the conceptual design of the SSFF Core; fabrication and testing of the 'breadboards' or development models; and preparation for and support of a requirements definition review.

  4. National Biomedical Tracer Facility. Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schafer, R.

    We request a $25 million government-guaranteed, interest-free loan to be repaid over a 30-year period for construction and initial operations of a cyclotron-based National Biomedical Tracer Facility (NBTF) in North Central Texas. The NBTF will be co-located with a linear accelerator-based commercial radioisotope production facility, funded by the private sector at approximately $28 million. In addition, research radioisotope production by the NBTF will be coordinated through an association with an existing U.S. nuclear reactor center that will produce research and commercial radioisotopes through neutron reactions. The combined facilities will provide the full range of technology for radioisotope production and research:more » fast neutrons, thermal neutrons, and particle beams (H{sup -}, H{sup +}, and D{sup +}). The proposed NBTF facility includes an 80 MeV, 1 mA H{sup -} cyclotron that will produce proton-induced (neutron deficient) research isotopes.« less

  5. 47 CFR 4.5 - Definitions of outage, special offices and facilities, and 911 special facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, and 911 special facilities. 4.5 Section 4.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Definitions of outage, special offices and facilities, and 911 special facilities. (a) Outage is defined as a... government facilities.” 911 special facilities are addressed separately in paragraph (e) of this section. (c...

  6. Project Atlas Field Definitions | NOAA Gulf Spill Restoration

    Science.gov Websites

    Archive Home Project Atlas Field Definitions Project Atlas Field Definitions Field Definition Project Title The Project Title as listed in the Final Early Restoration Plan and Environmental Assessment (FERP /EA). General Information: Project Description Narrative description of the project. General

  7. Gas-Grain Simulation Facility (GGSF). Volume 1: Stage 1 facility definition studies

    NASA Technical Reports Server (NTRS)

    Gat, Nahum

    1993-01-01

    The Gas-Grain Simulation Facility (GGSF) is a facility-type payload to be included in the Space Station Freedom (SSF). The GGSF is a multidisciplinary facility that will accommodate several classes of experiments, including exobiology, planetary science, atmospheric science, and astrophysics. The physical mechanisms envisioned to be investigated include crystal growth, aggregation, nucleation, coagulation, condensation, collisions, fractal growth, cycles of freezing and evaporation, scavenging, longevity of bacteria, and more. TRW performed a Phase A study that included analyses of the science and technical (S&T) requirements, the development of facility functional requirements, and a conceptual design of the facility. The work that was performed under Stage 1 of the Phase A study and the results to date are summarized. In this stage, facility definition studies were conducted in sufficient detail to establish the technical feasibility of the candidate strawman experiments. The studies identified technical difficulties, identified required facility subsystems, surveyed existing technology studies and established preliminary facility weight, volume, power consumption, data systems, interface definition, and crew time requirements. The results of this study served as the basis for Stage 2 of the Phase A study in which a conceptual design and a reference design were performed. The results also served as a basis for a related study for a Gas-Grain Simulation Experiment Module (GGSEM), which is an apparatus intended to perform a subset of the GGSF experiments on board a low-Earth-orbiting platform.

  8. The Environmental Management Project Manager`s Handbook for improved project definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less

  9. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  10. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  11. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  12. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  13. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  14. The NTF as a national facility. [project planning

    NASA Technical Reports Server (NTRS)

    Nicks, O. W.

    1977-01-01

    Activities which led to the definition of the National Transonic Facility and the general agreements reached regarding its use and operations are reviewed. Topics discussed include: redefinition of test requirements, development of low cost options, consideration of a single transonic facility using existing hardware if feasible, facility concept recommendations, and acquisition schedule proposals.

  15. Campania Region's Educational Quality Facilities Project

    ERIC Educational Resources Information Center

    Ponti, Giorgio

    2009-01-01

    This article describes the Educational Quality Facilities project undertaken by Italy's Campania Region to provide quality facilities to all of its communities basing new spaces on the "Flexible Learning Module". The objectives of the five-year project are to: build and equip new educational spaces; improve the quality of existing…

  16. 76 FR 55255 - Definition of Solid Waste Disposal Facilities for Tax-Exempt Bond Purposes; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Definition of Solid Waste Disposal Facilities for Tax-Exempt Bond Purposes; Correction AGENCY: Internal..., on the definition of solid waste disposal facilities for purposes of the rules applicable to tax... governments that issue tax-exempt bonds to finance solid waste disposal facilities and to taxpayers that use...

  17. 76 FR 55256 - Definition of Solid Waste Disposal Facilities for Tax-Exempt Bond Purposes; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Definition of Solid Waste Disposal Facilities for Tax-Exempt Bond Purposes; Correction AGENCY: Internal..., 2011, on the definition of solid waste disposal facilities for purposes of the rules applicable to tax... governments that issue tax-exempt bonds to finance solid waste disposal facilities and to taxpayers that use...

  18. Chemical facility vulnerability assessment project.

    PubMed

    Jaeger, Calvin D

    2003-11-14

    Sandia National Laboratories, under the direction of the Office of Science and Technology, National Institute of Justice, conducted the chemical facility vulnerability assessment (CFVA) project. The primary objective of this project was to develop, test and validate a vulnerability assessment methodology (VAM) for determining the security of chemical facilities against terrorist or criminal attacks (VAM-CF). The project also included a report to the Department of Justice for Congress that in addition to describing the VAM-CF also addressed general observations related to security practices, threats and risks at chemical facilities and chemical transport. In the development of the VAM-CF Sandia leveraged the experience gained from the use and development of VAs in other areas and the input from the chemical industry and Federal agencies. The VAM-CF is a systematic, risk-based approach where risk is a function of the severity of consequences of an undesired event, the attack potential, and the likelihood of adversary success in causing the undesired event. For the purpose of the VAM-CF analyses Risk is a function of S, L(A), and L(AS), where S is the severity of consequence of an event, L(A) is the attack potential and L(AS) likelihood of adversary success in causing a catastrophic event. The VAM-CF consists of 13 basic steps. It involves an initial screening step, which helps to identify and prioritize facilities for further analysis. This step is similar to the prioritization approach developed by the American Chemistry Council (ACC). Other steps help to determine the components of the risk equation and ultimately the risk. The VAM-CF process involves identifying the hazardous chemicals and processes at a chemical facility. It helps chemical facilities to focus their attention on the most critical areas. The VAM-CF is not a quantitative analysis but, rather, compares relative security risks. If the risks are deemed too high, recommendations are developed for

  19. Project definition study for the National Biomedical Tracer Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roozen, K.

    The University of Alabama at Birmingham (UAB) has conducted a study of the proposed National Biomedical Tracer Facility (NBTF). In collaboration with General Atomics, RUST International, Coleman Research Corporation (CRC), IsoMed, Ernst and Young and the advisory committees, they have examined the issues relevant to the NBTF in terms of facility design, operating philosophy, and a business plan. They have utilized resources within UAB, CRC and Chem-Nuclear to develop recommendations on environmental, safety and health issues. The Institute of Medicine Panel`s Report on Isotopes for Medicine and the Life Sciences took the results of prior workshops further in developing recommendationsmore » for the mission of the NBTF. The IOM panel recommends that the NBTF accelerator have the capacity to accelerate protons to 80 MeV and a minimum of 750 microamperes of current. The panel declined to recommend a cyclotron or a linac. They emphasized a clear focus on research and development for isotope production including target design, separation chemistry and generator development. The facility needs to emphasize education and training in its mission. The facility must focus on radionuclide production for the research and clinical communities. The formation of a public-private partnership resembling the TRIUMF-Nordion model was encouraged. An advisory panel should assist with the NBTF operations and prioritization.« less

  20. The South African isotope facility project

    NASA Astrophysics Data System (ADS)

    Bark, R. A.; Barnard, A. H.; Conradie, J. L.; de Villiers, J. G.; van Schalkwyk, P. A.

    2018-05-01

    The South African Isotope Facility (SAIF) is a project in which iThemba LABS plans to build a radioactive-ion beam (RIB) facility. The project is divided into the Accelerator Centre of Exotic Isotopes (ACE Isotopes) and the Accelerator Centre for Exotic Beams (ACE Beams). For ACE Isotopes, a high-current, 70 MeV cyclotron will be acquired to take radionuclide production off the existing Separated Sector Cyclotron (SSC). A freed up SSC will then be available for an increased tempo of nuclear physics research and to serve as a driver accelerator for the ACE Beams project, in which protons will be used for the direct fission of Uranium, producing beams of fission fragments. The ACE Beams project has begun with "LeRIB" - a Low Energy RIB facility, now under construction. In a collaboration with INFN Legnaro, the target/ion-source "front-end" will be a copy of the front-end developed for the SPES project. A variety of targets may be inserted into the SPES front-end; a uranium-carbide target has been designed to produce up to 2 × 1013 fission/s using a 70 MeV proton beam of 150 µA intensity.

  1. Preliminary definition of a lunar landing and launch facility (Complex 39L)

    NASA Technical Reports Server (NTRS)

    Matthews, H. Dennis; Jenson, Eric B.; Linsley, Jerald N.

    1992-01-01

    A preliminary definition of a lunar landing and launch facility has been formulated. A permanently manned lunar base and a baseline lunar module are assumed. The major features of the facility are specified and major design areas are described.

  2. 34 CFR 75.622 - Definition of “project materials.”

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Definition of âproject materials.â 75.622 Section 75... Must Be Met by a Grantee? Publications and Copyrights § 75.622 Definition of “project materials.” As used in §§ 75.620-75.621, “project materials” means a copyrightable work developed with funds from a...

  3. Generic project definitions for improvement of health care delivery: a case-based approach.

    PubMed

    Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

    2011-01-01

    The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

  4. Engineering test facility design definition

    NASA Technical Reports Server (NTRS)

    Bercaw, R. W.; Seikel, G. R.

    1980-01-01

    The Engineering Test Facility (ETF) is the major focus of the Department of Energy (DOE) Magnetohydrodynamics (MHD) Program to facilitate commercialization and to demonstrate the commercial operability of MHD/steam electric power. The ETF will be a fully integrated commercial prototype MHD power plant with a nominal output of 200 MW sub e. Performance of this plant is expected to meet or surpass existing utility standards for fuel, maintenance, and operating costs; plant availability; load following; safety; and durability. It is expected to meet all applicable environmental regulations. The current design concept conforming to the general definition, the basis for its selection, and the process which will be followed in further defining and updating the conceptual design.

  5. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  6. Space infrared telescope facility project

    NASA Technical Reports Server (NTRS)

    Cruikshank, Dale P.

    1988-01-01

    The functions undertaken during this reporting period were: to inform the planetary science community of the progress and status of the Space Infrared Telescope Facility (SIRTF) Project; to solicit input from the planetary science community on needs and requirements of planetary science in the use of SIRTF at such time that it becomes an operational facility; and a white paper was prepared on the use of the SIRTF for solar system studies.

  7. The Online Learning Definitions Project

    ERIC Educational Resources Information Center

    International Association for K-12 Online Learning, 2011

    2011-01-01

    The mission of the International Association for K-12 Online Learning (iNACOL) is to ensure all students have access to a world-class education and quality online learning opportunities that prepare them for a lifetime of success. "The Online Learning Definitions Project" is designed to provide states, districts, online programs, and…

  8. Heritage Park Facilities PV Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobaica, Mark

    Project Objective: To procure a photovoltaic array (PV) system which will generate approximately 256kW of power to be used for the operations of the Aquatic Complex and the adjacent Senior Facility at the Heritage Park. This project complies with the EERE’s work and objectives by promoting the development and deployment of an energy system that will provide current and future generations with clean, efficient, affordable, and reliable energy.

  9. Geographic market definition: the case of Medicare-reimbursed skilled nursing facility care.

    PubMed

    Bowblis, John R; North, Phillip

    2011-01-01

    Correct geographic market definition is important to study the impact of competition. In the nursing home industry, most studies use geopolitical boundaries to define markets. This paper uses the Minimum Data Set to generate an alternative market definition based on patient flows for Medicare skilled nursing facilities. These distances are regressed against a range of nursing home and area characteristics to determine what influences market size. We compared Herfindahl-Hirschman Indices based on county and resident-flow measures of geographic market definition. Evidence from this comparison suggests that using the county for the market definition is not appropriate across all states.

  10. Definition of optical systems payloads

    NASA Technical Reports Server (NTRS)

    Downey, J. A., III

    1981-01-01

    The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

  11. Concentrating Solar Power Projects - National Solar Thermal Power Facility

    Science.gov Websites

    | Concentrating Solar Power | NREL National Solar Thermal Power Facility Status Date: February 13, 2014 Project Overview Project Name: National Solar Thermal Power Facility Country: India Location Capacity (Net): 1.0 MW Output Type: Steam Rankine Thermal Storage Storage Type: None

  12. Pre-Project Planning of Capital Facilities at NASA

    DTIC Science & Technology

    1999-12-01

    recognize the unfailing love and support of my extended family; Jim and Nancy Marasco , Dan and Monica Mustard, Jimmy and Jodi Marasco , Irene Brekelmans...completion Attachment B 116 Bibliography/References Dumont, Peter R. (1995). Project Definition Rating Index (PDRI) for Industrial Projects. Austin

  13. Report on Collaborative Facilities Projects.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    California's community colleges develop their own requests in concert with their district five-year master plan. They then submit those requests to the State Chancellor's Office for review. This document discusses the current process of submitting proposals for collaborative facilities projects, and outlines and discusses five recommendations for…

  14. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  15. UTEX: integrated ultraviolet and x-ray astronomy facility on spacelab, phase a study. Volume 2: facility definition. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-07-01

    The definition and feasibility study of an integrated ultraviolet and astronomy facility onboard Spacelab are presented. This is based on the scientific aims of different European countries. The accommodation of such a facility in the first and second Spacelab flights was also studied, taking into account external constraints of both flights and the possibility of future missions. Well identified possible work packages are outlined in view of future international cooperation.

  16. NASA in-house Commercially Developed Space Facility (CDSF) study report. Volume 1: Concept configuration definition

    NASA Technical Reports Server (NTRS)

    Deryder, L. J.; Chiger, H. D.; Deryder, D. D.; Detweiler, K. N.; Dupree, R. L.; Gillespie, V. P.; Hall, J. B.; Heck, M. L.; Herrick, D. C.; Katzberg, S. J.

    1989-01-01

    The results of a NASA in-house team effort to develop a concept definition for a Commercially Developed Space Facility (CDSF) are presented. Science mission utilization definition scenarios are documented, the conceptual configuration definition system performance parameters qualified, benchmark operational scenarios developed, space shuttle interface descriptions provided, and development schedule activity was assessed with respect to the establishment of a proposed launch date.

  17. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  18. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  19. 29 CFR 1917.73 - Terminal facilities handling menhaden and similar species of fish (see also § 1917.2, definition...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Terminal facilities handling menhaden and similar species of fish (see also § 1917.2, definition of hazardous cargo, material, substance or atmosphere). 1917... facilities handling menhaden and similar species of fish (see also § 1917.2, definition of hazardous cargo...

  20. Congressional hearing reviews NSF major research and facilities projects

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  1. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  2. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  3. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  4. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  5. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  6. School Facility Projects in Latin America

    ERIC Educational Resources Information Center

    Berk, Jeffrey; de Cassia Alves Vaz, Rita; Honorio, Joao; Baza, Jadille; Origel, Ricardo; Gomez, Fredys

    2004-01-01

    Many Latin American countries are undertaking projects, in line with practices disseminated by PEB, to share school facilities with the local community, to adapt traditional schools for students with disabilities, and to collaborate with private companies to finance educational buildings. The articles below describe current initiatives in five…

  7. Space Station Furnace Facility. Volume 1: Requirements definition and conceptual design study, executive summary

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Space Station Freedom Furnace (SSFF) Study was awarded on June 2, 1989, to Teledyne Brown Engineering (TBE) to define an advanced facility for materials research in the microgravity environment of Space Station Freedom (SSF). The SSFF will be designed for research in the solidification of metals and alloys, the crystal growth of electronic and electro-optical materials, and research in glasses and ceramics. The SSFF is one of the first 'facility' class payloads planned by the Microgravity Science and Applications Division (MSAD) of the Office of Space Science and Applications of NASA Headquarters. This facility is planned for early deployment during man-tended operations of the SSF with continuing operations through the Permanently Manned Configuration (PMC). The SSFF will be built around a general 'Core' facility which provides common support functions not provided by SSF, common subsystems which are best centralized, and common subsystems which are best distributed with each experiment module. The intent of the facility approach is to reduce the overall cost associated with implementing and operating a variety of experiments. This is achieved by reducing the launch mass and simplifying the hardware development and qualification processes associated with each experiment. The Core will remain on orbit and will require only periodic maintenance and upgrading while new Furnace Modules, samples, and consumables are developed, qualified, and transported to the SSF. The SSFF Study was divided into two phases: phase 1, a definition study phase, and phase 2, a design and development phase. The definition phase 1 is addressed. Phase 1 was divided into two parts. In the first part, the basic part of the effort, covered the preliminary definition and assessment of requirements; conceptual design of the SSFF; fabrication of mockups; and the preparation for and support of the Conceptual Design Review (CoDR). The second part, the option part, covered requirements update and

  8. VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    CONRAD, M.J.; VALENTINE, I.E.

    IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…

  9. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  10. Project Nuclotron-based Ion Collider fAcility at JINR

    NASA Astrophysics Data System (ADS)

    Kekelidze, V. D.; Matveev, V. A.; Meshkov, I. N.; Sorin, A. S.; Trubnikov, G. V.

    2017-09-01

    The project of Nuclotron-based Ion Collider fAcility (NICA) that is under development at JINR (Dubna) is presented. The general goals of the project are experimental studies of both hot and dense baryonic matter and spin physics (in collisions of polarized protons and deuterons). The first program requires providing of heavy ion collisions in the energy range of √ {{s_{NN}}} = 4-11 Gev at average luminosity of L = 1 × 1027 cm-2 s-1 for 197Au79+ nuclei. The polarized beams mode is proposed to be used in energy range of √ {{s_{NN}}} = 12-27 Gev (protons at luminosity of L ≥ 1 × 1030 cm-2 s-1. The report contains description of the facility scheme and its characteristics in heavy ion operation mode. The Collider will be equipped with two detectors—MultiPurpose Detector (MPD), which is in an active stage of construction, and Spin Physics Detector (SPD) that is in the stage of conceptual design. Fixed target experiment "Baryonic matter at Nuclotron" (BM@N) will be performed in very beginning of the project. The wide program of applied researches at NICA facility is being developed as well.

  11. Overview of the NASA Dryden Flight Research Facility aeronautical flight projects

    NASA Technical Reports Server (NTRS)

    Meyer, Robert R., Jr.

    1992-01-01

    Several principal aerodynamics flight projects of the NASA Dryden Flight Research Facility are discussed. Key vehicle technology areas from a wide range of flight vehicles are highlighted. These areas include flight research data obtained for ground facility and computation correlation, applied research in areas not well suited to ground facilities (wind tunnels), and concept demonstration.

  12. Gas-Grain Simulation Facility (GGSF). Volume 2: Conceptual design definition

    NASA Technical Reports Server (NTRS)

    Zamel, James M.

    1993-01-01

    This document is Volume 2 of the Final Report for the Phase A Study of the Gas-Grain Simulation Facility (GGSF), and presents the GGSF Conceptual Design. It is a follow-on to the Volume 1 Facility Definition Study, NASA report CR 177606. The development of a conceptual design for a Space Station Freedom (SSF) facility that will be used for investigating particle interactions in varying environments, including various gas mixtures, pressures, and temperatures is delineated. It's not possible to study these experiments on earth due to the long reaction times associated with this type of phenomena, hence the need for extended periods of microgravity. The particle types will vary in composition (solids and liquids), sizes (from submicrons to centimeters), and concentrations (from single particles to 10(exp 10) per cubic centimeter). The results of the experiments pursued in the GGSF will benefit a variety of scientific inquiries. These investigations span such diverse topics as the formation of planets and planetary rings, cloud and haze processes in planetary atmospheres, the composition and structure of astrophysical objects, and the viability of airborne microbes (e.g., in a manned spacecraft).

  13. W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armpriester, Anthony; Smith, Roger; Scheriffius, Jeff

    2014-02-01

    For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy,more » Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: • Phase I. Project Definition/Front-End Engineering Design (FEED) • Phase ll. Detailed Engineering, Procurement & Construction • Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and

  14. Development of a large-screen high-definition laser video projection system

    NASA Astrophysics Data System (ADS)

    Clynick, Tony J.

    1991-08-01

    A prototype laser video projector which uses electronic, optical, and mechanical means to project a television picture is described. With the primary goal of commercial viability, the price/performance ratio of the chosen means is critical. The fundamental requirement has been to achieve high brightness, high definition images of at least movie-theater size, at a cost comparable with other existing large-screen video projection technologies, while having the opportunity of developing and exploiting the unique properties of the laser projected image, such as its infinite depth-of-field. Two argon lasers are used in combination with a dye laser to achieve a range of colors which, despite not being identical to those of a CRT, prove to be subjectively acceptable. Acousto-optic modulation in combination with a rotary polygon scanner, digital video line stores, novel specialized electro-optics, and a galvanometric frame scanner form the basis of the projection technique achieving a 30 MHz video bandwidth, high- definition scan rates (1125/60 and 1250/50), high contrast ratio, and good optical efficiency. Auditorium projection of HDTV pictures wider than 20 meters are possible. Applications including 360 degree(s) projection and 3-D video provide further scope for exploitation of the HD laser video projector.

  15. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  16. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  17. 42 CFR 483.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Definitions. 483.5 Section 483.5 Public Health... Care Facilities § 483.5 Definitions. (a) Facility defined. For purposes of this subpart, facility means... for mental diseases as defined in § 435.1010 of this chapter. (b) Distinct part—(1) Definition. A...

  18. The Ohio School Facilities Commission. Revamping the State's School Construction Projects.

    ERIC Educational Resources Information Center

    De Patta, Joe

    2001-01-01

    Presents an interview with the Ohio School Facilities Commission's (OSFC) Executive Director who discusses the OSFC's history and its work in managing K-12 school facilities throughout the state. Topics include its efforts to help school districts get bond measures on ballets, funding projects, and its "Partnering Program" for construction…

  19. National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W J; Moses, E; Warner, B

    2000-12-07

    The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  20. Definition of performance specifications for automated Analytical Electrophoresis Facility (AAEF)

    NASA Technical Reports Server (NTRS)

    Brooks, D. E.

    1976-01-01

    In order to provide specifications for the automated Analytical Electrophoresis Facility (AAEF) that would satisfy the broadest variety of demands of a future user community, a survey was carried out of all those people who were identified as having published papers on cell electrophoresis in the past four years. A computer search was conducted of the relevant literature from which a list of 87 investigators was derived and defined as the user community for purposes of the mailing. A questionnaire was developed covering the areas of performance which required definition which was subsequently circulated to the user community. Based on the response to this survey performance specifications were assembled.

  1. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobson, D; Churby, A; Krieger, E

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less

  2. Universal definition of loss to follow-up in HIV treatment programs: a statistical analysis of 111 facilities in Africa, Asia, and Latin America.

    PubMed

    Chi, Benjamin H; Yiannoutsos, Constantin T; Westfall, Andrew O; Newman, Jamie E; Zhou, Jialun; Cesar, Carina; Brinkhof, Martin W G; Mwango, Albert; Balestre, Eric; Carriquiry, Gabriela; Sirisanthana, Thira; Mukumbi, Henri; Martin, Jeffrey N; Grimsrud, Anna; Bacon, Melanie; Thiebaut, Rodolphe

    2011-10-01

    Although patient attrition is recognized as a threat to the long-term success of antiretroviral therapy programs worldwide, there is no universal definition for classifying patients as lost to follow-up (LTFU). We analyzed data from health facilities across Africa, Asia, and Latin America to empirically determine a standard LTFU definition. At a set "status classification" date, patients were categorized as either "active" or "LTFU" according to different intervals from time of last clinic encounter. For each threshold, we looked forward 365 d to assess the performance and accuracy of this initial classification. The best-performing definition for LTFU had the lowest proportion of patients misclassified as active or LTFU. Observational data from 111 health facilities-representing 180,718 patients from 19 countries-were included in this study. In the primary analysis, for which data from all facilities were pooled, an interval of 180 d (95% confidence interval [CI]: 173-181 d) since last patient encounter resulted in the fewest misclassifications (7.7%, 95% CI: 7.6%-7.8%). A secondary analysis that gave equal weight to cohorts and to regions generated a similar result (175 d); however, an alternate approach that used inverse weighting for cohorts based on variance and equal weighting for regions produced a slightly lower summary measure (150 d). When examined at the facility level, the best-performing definition varied from 58 to 383 d (mean=150 d), but when a standard definition of 180 d was applied to each facility, only slight increases in misclassification (mean=1.2%, 95% CI: 1.0%-1.5%) were observed. Using this definition, the proportion of patients classified as LTFU by facility ranged from 3.1% to 45.1% (mean=19.9%, 95% CI: 19.1%-21.7%). Based on this evaluation, we recommend the adoption of ≥180 d since the last clinic visit as a standard LTFU definition. Such standardization is an important step to understanding the reasons that underlie patient attrition

  3. Project TANDEM (Tsunamis in the Atlantic and the English ChaNnel: Definition of the Effects through numerical Modeling) (2014-2018): a French initiative to draw lessons from the Tohoku-oki tsunami on French coastal nuclear facilities

    NASA Astrophysics Data System (ADS)

    Hébert, Hélène; Abadie, Stéphane; Benoit, Michel; Créach, Ronan; Frère, Antoine; Gailler, Audrey; Garzaglia, Sébastien; Hayashi, Yutaka; Loevenbruck, Anne; Macary, Olivier; Marcer, Richard; Morichon, Denis; Pedreros, Rodrigo; Rebour, Vincent; Ricchiuto, Mario; Silva Jacinto, Ricardo; Terrier, Monique; Toucanne, Samuel; Traversa, Paola; Violeau, Damien

    2014-05-01

    TANDEM (Tsunamis in the Atlantic and the English ChaNnel: Definition of the Effects through numerical Modeling) is a French research project dedicated to the appraisal of coastal effects due to tsunami waves on the French coastlines, with a special focus on the Atlantic and Channel coastlines, where French civil nuclear facilities have been operating since about 30 years. This project aims at drawing conclusions from the 2011 catastrophic tsunami, and will allow, together with a Japanese research partner, to design, adapt and validate numerical methods of tsunami hazard assessment, using the outstanding database of the 2011 tsunami. Then the validated methods will be applied to estimate, as accurately as possible, the tsunami hazard for the French Atlantic and Channel coastlines, in order to provide guidance for risk assessment on the nuclear facilities. The project TANDEM follows the recommendations of International Atomic Energy Agency (IAEA) to analyse the tsunami exposure of the nuclear facilities, as well as the recommendations of the French Nuclear Safety Authority (Autorité de Sûreté Nucléaire, ASN) in the aftermath of the 2011 catastrophe, which required the licensee of nuclear facilities to conduct complementary safety assessments (CSA), also including "the robustness beyond their design basis". The tsunami hazard deserves an appraisal in the light of the 2011 catastrophe, to check whether any unforeseen tsunami impact can be expected for these facilities. TANDEM aims at defining the tsunami effects expected for the French Atlantic and Channel coastlines, basically from numerical modeling methods, through adaptation and improvement of numerical methods, in order to study tsunami impacts down to the interaction with coastal structures (thus sometimes using 3D approaches) (WP1). Then the methods will be tested to better characterize and quantify the associated uncertainties (in the source, the propagation, and the coastal impact) (WP2). The project will

  4. Digital imaging technology assessment: Digital document storage project

    NASA Technical Reports Server (NTRS)

    1989-01-01

    An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.

  5. 24 CFR 891.655 - Definitions applicable to 202/162 projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...

  6. 24 CFR 891.655 - Definitions applicable to 202/162 projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...

  7. 24 CFR 891.655 - Definitions applicable to 202/162 projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...

  8. 24 CFR 891.655 - Definitions applicable to 202/162 projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...

  9. Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455)

    DTIC Science & Technology

    2014-06-01

    TECHNICAL REPORT 2077 June 2014 Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455... Stormwater Discharges at Naval Facilities (NESDI Project 455) Final Report and Guidance C. Katz K. Sorensen E. Arias SSC Pacific R. Pitt L. Talebi...demonstration/validation project to assess the use of the urban stormwater model Windows Source Loading and Management Model (WinSLAMM) to characterize

  10. Environmental Projects. Volume 9: Construction of hazardous materials storage facilities

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.

  11. 14 CFR 1204.1401 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NASA Airfield Facilities by Aircraft Not Operated for the Benefit of the Federal Government § 1204.1401 Definitions. For the purpose of this subpart, the following definitions apply: (a) NASA Airfield Facility. Those aeronautical facilities owned and operated by NASA that consist of the following: (1) Shuttle...

  12. 14 CFR 1204.1401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NASA Airfield Facilities by Aircraft Not Operated for the Benefit of the Federal Government § 1204.1401 Definitions. For the purpose of this subpart, the following definitions apply: (a) NASA Airfield Facility. Those aeronautical facilities owned and operated by NASA that consist of the following: (1) Shuttle...

  13. 14 CFR 1204.1401 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NASA Airfield Facilities by Aircraft Not Operated for the Benefit of the Federal Government § 1204.1401 Definitions. For the purpose of this subpart, the following definitions apply: (a) NASA Airfield Facility. Those aeronautical facilities owned and operated by NASA that consist of the following: (1) Shuttle...

  14. Universal Definition of Loss to Follow-Up in HIV Treatment Programs: A Statistical Analysis of 111 Facilities in Africa, Asia, and Latin America

    PubMed Central

    Chi, Benjamin H.; Yiannoutsos, Constantin T.; Westfall, Andrew O.; Newman, Jamie E.; Zhou, Jialun; Cesar, Carina; Brinkhof, Martin W. G.; Mwango, Albert; Balestre, Eric; Carriquiry, Gabriela; Sirisanthana, Thira; Mukumbi, Henri; Martin, Jeffrey N.; Grimsrud, Anna; Bacon, Melanie; Thiebaut, Rodolphe

    2011-01-01

    Background Although patient attrition is recognized as a threat to the long-term success of antiretroviral therapy programs worldwide, there is no universal definition for classifying patients as lost to follow-up (LTFU). We analyzed data from health facilities across Africa, Asia, and Latin America to empirically determine a standard LTFU definition. Methods and Findings At a set “status classification” date, patients were categorized as either “active” or “LTFU” according to different intervals from time of last clinic encounter. For each threshold, we looked forward 365 d to assess the performance and accuracy of this initial classification. The best-performing definition for LTFU had the lowest proportion of patients misclassified as active or LTFU. Observational data from 111 health facilities—representing 180,718 patients from 19 countries—were included in this study. In the primary analysis, for which data from all facilities were pooled, an interval of 180 d (95% confidence interval [CI]: 173–181 d) since last patient encounter resulted in the fewest misclassifications (7.7%, 95% CI: 7.6%–7.8%). A secondary analysis that gave equal weight to cohorts and to regions generated a similar result (175 d); however, an alternate approach that used inverse weighting for cohorts based on variance and equal weighting for regions produced a slightly lower summary measure (150 d). When examined at the facility level, the best-performing definition varied from 58 to 383 d (mean = 150 d), but when a standard definition of 180 d was applied to each facility, only slight increases in misclassification (mean = 1.2%, 95% CI: 1.0%–1.5%) were observed. Using this definition, the proportion of patients classified as LTFU by facility ranged from 3.1% to 45.1% (mean = 19.9%, 95% CI: 19.1%–21.7%). Conclusions Based on this evaluation, we recommend the adoption of ≥180 d since the last clinic visit as a standard LTFU definition. Such

  15. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  16. Evaluation of Nuclear Facility Decommissioning Projects program: a reference research reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baumann, B.L.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference research reactor (RRR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program.

  17. 24 CFR 891.655 - Definitions applicable to 202/162 projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... residing in an intermediate care facility for the mentally retarded that is assisted under Title XIX of the... family residential structure designed or adapted for occupancy by nonelderly handicapped individuals... that are primarily nonelderly handicapped families. Independent living complex means a project designed...

  18. The National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W.J.; Moses, E.; Warner, B.

    2000-12-07

    The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  19. Benchmark experiments at ASTRA facility on definition of space distribution of {sup 235}U fission reaction rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bobrov, A. A.; Boyarinov, V. F.; Glushkov, A. E.

    2012-07-01

    Results of critical experiments performed at five ASTRA facility configurations modeling the high-temperature helium-cooled graphite-moderated reactors are presented. Results of experiments on definition of space distribution of {sup 235}U fission reaction rate performed at four from these five configurations are presented more detail. Analysis of available information showed that all experiments on criticality at these five configurations are acceptable for use them as critical benchmark experiments. All experiments on definition of space distribution of {sup 235}U fission reaction rate are acceptable for use them as physical benchmark experiments. (authors)

  20. 48 CFR 1830.7002-1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definitions. 1830.7002-1... GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION Facilities Capital Employed for Facilities in Use and For Facilities Under Construction 1830.7002-1 Definitions. (a) Cost of money rate is...

  1. Definitions and Uses: Case Study of Teachers Implementing Project-Based Learning

    ERIC Educational Resources Information Center

    Tamim, Suha R.; Grant, Michael M.

    2013-01-01

    The purpose of this descriptive study was to explore inservice teachers' definitions of project-based learning (PjBL) and their accounts on the meaning of their PjBL implementations. A purposive sample of six teachers from grades four through twelve in public and private schools participated. Three themes evolved from inductive analysis: (1)…

  2. 14 CFR § 1204.1401 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... POLICY Use of NASA Airfield Facilities by Aircraft Not Operated for the Benefit of the Federal Government § 1204.1401 Definitions. For the purpose of this subpart, the following definitions apply: (a) NASA Airfield Facility. Those aeronautical facilities owned and operated by NASA that consist of the following...

  3. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  4. The DE-PHARM Project: A Pharmacist-Driven Deprescribing Initiative in a Nursing Facility.

    PubMed

    Pruskowski, Jennifer; Handler, Steven M

    2017-08-01

    Many residents with life-limiting illnesses are being prescribed and taking potentially inappropriate medications (PIMs) and questionably beneficial medications either near or at the end of life. These medications can contribute to adverse drug reactions, increase morbidity, and increase unnecessary burden and cost. It is crucial that the process of deprescribing be incorporated into the care of these residents. After developing a clinical pharmacist-driven deprescribing initiative in the nursing facility, the objective of this project was to reduce the number of PIMs via accepted recommendations from the clinical pharmacist to the primary team. The Discussion to Ensure the Patient-centered, Health-focused, prognosis-Appropriate, and Rational Medication regimen (DE-PHARM) quality improvement-approved project was conducted in an urban, academic nursing facility in Pittsburgh, Pennsylvania. The pilot phase occurred between October 2015 and April 2016. To be included in this study, participants had to be a custodial resident of the nursing facility with a previously documented comfort-focused treatment plan. All medications used for the management of chronic comorbid diseases were eligible for review. Forty-seven residents managed by eight different primary teams met inclusion criteria. Thirty-nine recommendations for 23 residents were made by the clinical pharmacist, with an average of 0.82 and range of 0-5 recommendations per resident, respectively. Of those, only 10 (26%) were accepted, 1 (3%) was modified, 3 (7%) were rejected, and 25 (64%) had no response within the 120-day response period. Additionally, two residents died during the project, and one resident was readmitted to the hospital for a prolonged period of time. The pilot phase of the DE-PHARM project, a clinical pharmacist-driven deprescribing initiative, was designed and assessed. This project demonstrated the feasibility of such an initiative. Because of the complexity of such a process, special

  5. The ISOLDE facility and the HIE-HISOLDE project: Recent highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borge, M. J. G.

    2014-07-23

    The ISOLDE facility at CERN has as objective the production, study and research of nuclei far from stability. The facility provides low energy radioactive beams and post-accelerated beams. In the last 45 years the ISOLDE facility has gathered unique expertise in research with radioactive beams. Over 700 isotopes of more than 70 elements have been used in a wide range of research domains, including cutting edge studies in nuclear structure, atomic physics, nuclear astrophysics, and fundamental interactions. These nuclear probes are also used to do frontier research in solid state and life sciences. There is an on-going upgrade of themore » facility, the HIE-ISOLDE project, which aims to improve the ISOLDE capabilities in a wide front, from an energy increase of the post-accelerated beam to improvements in beam quality and beam purity. The first phase of HIE-ISOLDE will start for physics in the autumn of 2015 with an upgrade of energy for all post-accelerated ISOLDE beams up to 5.5 MeV/u. In this contribution the most recent highlights of the facility are presented.« less

  6. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  7. 40 CFR 113.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Definitions. 113.3 Section 113.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS LIABILITY LIMITS FOR SMALL ONSHORE STORAGE FACILITIES Oil Storage Facilities § 113.3 Definitions. As used in this subpart...

  8. 40 CFR 113.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Definitions. 113.3 Section 113.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS LIABILITY LIMITS FOR SMALL ONSHORE STORAGE FACILITIES Oil Storage Facilities § 113.3 Definitions. As used in this subpart...

  9. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  10. 10 CFR 1707.103 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 1707.103 Section 1707.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD TESTIMONY BY DNFSB EMPLOYEES AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS General Provisions § 1707.103 Definitions. DNFSB means the Defense Nuclear Facilities Safety Board...

  11. 10 CFR 1707.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Definitions. 1707.103 Section 1707.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD TESTIMONY BY DNFSB EMPLOYEES AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS General Provisions § 1707.103 Definitions. DNFSB means the Defense Nuclear Facilities Safety Board...

  12. 10 CFR 1707.103 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 1707.103 Section 1707.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD TESTIMONY BY DNFSB EMPLOYEES AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS General Provisions § 1707.103 Definitions. DNFSB means the Defense Nuclear Facilities Safety Board...

  13. 10 CFR 1707.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Definitions. 1707.103 Section 1707.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD TESTIMONY BY DNFSB EMPLOYEES AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS General Provisions § 1707.103 Definitions. DNFSB means the Defense Nuclear Facilities Safety Board...

  14. 10 CFR 1707.103 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 1707.103 Section 1707.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD TESTIMONY BY DNFSB EMPLOYEES AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS General Provisions § 1707.103 Definitions. DNFSB means the Defense Nuclear Facilities Safety Board...

  15. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  16. Conceptual planning for Space Station life sciences human research project

    NASA Technical Reports Server (NTRS)

    Primeaux, Gary R.; Miller, Ladonna J.; Michaud, Roger B.

    1986-01-01

    The Life Sciences Research Facility dedicated laboratory is currently undergoing system definition within the NASA Space Station program. Attention is presently given to the Humam Research Project portion of the Facility, in view of representative experimentation requirement scenarios and with the intention of accommodating the Facility within the Initial Operational Capability configuration of the Space Station. Such basic engineering questions as orbital and ground logistics operations and hardware maintenance/servicing requirements are addressed. Biospherics, calcium homeostasis, endocrinology, exercise physiology, hematology, immunology, muscle physiology, neurosciences, radiation effects, and reproduction and development, are among the fields of inquiry encompassed by the Facility.

  17. Educational Facility Design and Project Based Learning: "The Real Connection"

    ERIC Educational Resources Information Center

    Schrader, David L.; Sole, John

    2009-01-01

    There is a case to be made for the integration of the Project Based Service Learning (PBSL) process and the design and construction of educational facilities. A growing body of research supports the notion that the formulaic educational system of the last hundred years may no longer serve the learning styles of new and future generations. Their…

  18. Simulation Facilities and Test Beds for Galileo

    NASA Astrophysics Data System (ADS)

    Schlarmann, Bernhard Kl.; Leonard, Arian

    2002-01-01

    Galileo is the European satellite navigation system, financed by the European Space Agency (ESA) and the European Commission (EC). The Galileo System, currently under definition phase, will offer seamless global coverage, providing state-of-the-art positioning and timing services. Galileo services will include a standard service targeted at mass market users, an augmented integrity service, providing integrity warnings when fault occur and Public Regulated Services (ensuring a continuity of service for the public users). Other services are under consideration (SAR and integrated communications). Galileo will be interoperable with GPS, and will be complemented by local elements that will enhance the services for specific local users. In the frame of the Galileo definition phase, several system design and simulation facilities and test beds have been defined and developed for the coming phases of the project, respectively they are currently under development. These are mainly the following tools: Galileo Mission Analysis Simulator to design the Space Segment, especially to support constellation design, deployment and replacement. Galileo Service Volume Simulator to analyse the global performance requirements based on a coverage analysis for different service levels and degrades modes. Galileo System Simulation Facility is a sophisticated end-to-end simulation tool to assess the navigation performances for a complete variety of users under different operating conditions and different modes. Galileo Signal Validation Facility to evaluate signal and message structures for Galileo. Galileo System Test Bed (Version 1) to assess and refine the Orbit Determination &Time Synchronisation and Integrity algorithms, through experiments relying on GPS space infrastructure. This paper presents an overview on the so called "G-Facilities" and describes the use of the different system design tools during the project life cycle in order to design the system with respect to

  19. Universal Test Facility

    NASA Technical Reports Server (NTRS)

    Laughery, Mike

    1994-01-01

    A universal test facility (UTF) for Space Station Freedom is developed. In this context, universal means that the experimental rack design must be: automated, highly marketable, and able to perform diverse microgravity experiments according to NASA space station requirements. In order to fulfill these broad objectives, the facility's customers, and their respective requirements, are first defined. From these definitions, specific design goals and the scope of the first phase of this project are determined. An examination is first made into what types of research are most likely to make the UTF marketable. Based on our findings, the experiments for which the UTF would most likely be used included: protein crystal growth, hydroponics food growth, gas combustion, gallium arsenide crystal growth, microorganism development, and cell encapsulation. Therefore, the UTF is designed to fulfill all of the major requirements for the experiments listed above. The versatility of the design is achieved by taking advantage of the many overlapping requirements presented by these experiments.

  20. Universal Test Facility

    NASA Astrophysics Data System (ADS)

    Laughery, Mike

    A universal test facility (UTF) for Space Station Freedom is developed. In this context, universal means that the experimental rack design must be: automated, highly marketable, and able to perform diverse microgravity experiments according to NASA space station requirements. In order to fulfill these broad objectives, the facility's customers, and their respective requirements, are first defined. From these definitions, specific design goals and the scope of the first phase of this project are determined. An examination is first made into what types of research are most likely to make the UTF marketable. Based on our findings, the experiments for which the UTF would most likely be used included: protein crystal growth, hydroponics food growth, gas combustion, gallium arsenide crystal growth, microorganism development, and cell encapsulation. Therefore, the UTF is designed to fulfill all of the major requirements for the experiments listed above. The versatility of the design is achieved by taking advantage of the many overlapping requirements presented by these experiments.

  1. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kollar, Lenka; Mathews, Caroline E.

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states’ (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In ordermore » to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.« less

  2. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, N.

    1995-05-02

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD).

  3. Power interconnection projects in the ASEAN region: Definitional-mission report No. 1. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-06-01

    In response to a request from the Association of Southeast Asian Nations (ASEAN), the U.S. Trade and Development Program (TDP) conducted a definitional mission to evaluate the prospects of TDP funding for five Power Interconnection Projects in the ASEAN region. These projects included: Batam-Singapore Interconnection; Sumatera-Peninsular Malaysia Interconnection; Sarawak-West Kalimantan Interconnection; Sarawak-Brunei-Sabah Interconnection; and Java-Sumatera Interconnection. Based on a review of the proposed scopes of work for the projects and the discussions in the field, the report summarizes the technical details and the costs of implementation for the projects.

  4. Education & Collection Facility GSHP Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joplin, Jeff

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to amore » recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an

  5. [Interdisciplinary Cooperation as a Characteristic of Successful Rehabilitation Facilities--Results from the Project MeeR].

    PubMed

    Kleineke, V; Stamer, M; Zeisberger, M; Brandes, I; Meyer, T

    2015-08-01

    To determine if there is a difference between successful and less successful rehabilitation facilities concerning their extent and quality of interdisciplinary cooperation? This analysis is part of the project MeeR, that aims to identify characteristics of rehabilitation facilities related to successful rehabilitation. 6 facilities were recruited based on a quantitative analysis; 3 facilities that ranked as above average and 3 as below average in terms of their success in rehabilitating patients. Comprehensive qualitative data were collected on these 6 facilities. In above average rehabilitation facilities, the extent of interdisciplinary cooperation was higher than in below average facilities; the position of the medical profession was less dominant and there was a wider access to team meetings. Promotion of interdisciplinary cooperation is an important component for the improvement of the success of rehabilitation facilities. © Georg Thieme Verlag KG Stuttgart · New York.

  6. Genius Loci: MacConnell Award Projects + Ewan McIntosh's Seven Spaces

    ERIC Educational Resources Information Center

    Baibak, Rebecca; Ruiz, Karina; Parker, Ross; Peters, Edward J.

    2011-01-01

    The surge of technology use in the 21st century is providing an opportunity for school facilities to reevaluate the value and definition of educational place. Traditionally, schools have served as places for information finding, project creating, publishing and presenting student work. They have evolved into places to support technological tools…

  7. On-orbit technology experiment facility definition

    NASA Technical Reports Server (NTRS)

    Russell, Richard A.; Buchan, Robert W.; Gates, Richard M.

    1988-01-01

    A study was conducted to identify on-orbit integrated facility needs to support in-space technology experiments on the Space Station and associated free flyers. In particular, the first task was to examine the proposed technology development missions (TDMX's) from the model mission set and other proposed experimental facilities, both individually and by theme, to determine how and if the experiments might be combined, what equipment might be shared, what equipment might be used as generic equipment for continued experimentation, and what experiments will conflict with the conduct of other experiments or Space Station operations. Then using these results, to determine on-orbit facility needs to optimize the implementation of technology payloads. Finally, to develop one or more scenarios, design concepts, and outfitting requirements for implementation of onboard technology experiments.

  8. Definition of ground test for Large Space Structure (LSS) control verification

    NASA Technical Reports Server (NTRS)

    Waites, H. B.; Doane, G. B., III; Tollison, D. K.

    1984-01-01

    An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.

  9. Definitive design report: Design report project W-025, Radioactive Mixed Waste (RMW) Land Disposal Facility NON-DRAG-OFF. Revision 1, Volume 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roscha, V.

    1994-11-29

    The purpose of this report is to describe the definitive design of the Radioactive Mixed Waste (RMW) Non-Drag-Off disposal facility, Project W-025. This report presents a n of the major landfill design features and a discussion of how each of the criteria is addressed in the design. The appendices include laboratory test results, design drawings, and individual analyses that were conducted in support of the design. Revision 1 of this document incorporates design changes resulting from an increase in the required operating life of the W-025 landfill from 2 to 20 years. The rationale for these design changes is describedmore » in Golder Associates Inc. 1991a. These changes include (1) adding a 1.5-foot-thick layer of compacted admix directory-under the primary FML on the floor of the landfill to mitigate the effects of possible stress cracking in the primary flexible membrane liner (FML), and (2) increasing the operations layer thickness from two to three feet over the entire landfill area, to provide additional protection for the secondary admix layer against mechanical damage and the effects of freezing and desiccation. The design of the W-025 Landfill has also been modified in response to the results of the EPA Method 9090 chemical compatibility testing program (Golder Associates Inc. 1991b and 1991c), which was completed after the original design was prepared. This program consisted of testing geosynthetic materials and soil/bentonite admix with synthetic leachate having the composition expected during the life of the W-025 Landfill., The results of this program indicated that the polyester geotextile originally specified for the landfill might be susceptible to deterioration. On this basis, polypropylene geotextiles were substituted as a more chemically-resistant alternative. In addition, the percentage of bentonite in the admix was increased to provide sufficiently low permeability to the expected leachate.« less

  10. A descriptive inquiry of the definitions of critical thinking and enhancers and barriers reported by nurses working in long-term care facilities.

    PubMed

    Raterink, Ginger

    2008-09-01

    Critical thinking has been an outcome of nursing education since the 1980s. There remains a lack of agreement on definitions, methods of teaching, and methods of evaluation among practicing nurses. This study asked practicing nurses to define critical thinking. It also asked nurses to describe what work-related factors enhanced or posed barriers to the use of critical thinking in practice. Elements of the definitions presented were found to be consistent with current nursing definitions of critical thinking. Enhancers and barriers overlapped and were found to be consistent among the nurses at all facilities studied, with implications for continuing education and staff development.

  11. Influence of computational fluid dynamics on experimental aerospace facilities: A fifteen year projection

    NASA Technical Reports Server (NTRS)

    1983-01-01

    An assessment was made of the impact of developments in computational fluid dynamics (CFD) on the traditional role of aerospace ground test facilities over the next fifteen years. With improvements in CFD and more powerful scientific computers projected over this period it is expected to have the capability to compute the flow over a complete aircraft at a unit cost three orders of magnitude lower than presently possible. Over the same period improvements in ground test facilities will progress by application of computational techniques including CFD to data acquisition, facility operational efficiency, and simulation of the light envelope; however, no dramatic change in unit cost is expected as greater efficiency will be countered by higher energy and labor costs.

  12. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. The radioactive ion beams facility project for the legnaro laboratories

    NASA Astrophysics Data System (ADS)

    Tecchio, Luigi B.

    1999-04-01

    In the frame work of the Italian participation to the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involving in the design and construction of prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has been already financially supported and the work is actually in progress. In this context, the LNL has been proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by using the ISOL method. The final goal consists in the production of neutron rich RIBs with masses ranging from 80 to 160 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is proposed to be developed in about 10 years from now and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999-2003). In such period of time is proposed the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production, to the BNCT applications and to the neutron physics. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed.

  14. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  15. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...

  16. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  17. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...

  18. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  19. 40 CFR 61.91 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... included. The method for calculating effective dose equivalent and the definition of reference man are... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Definitions. 61.91 Section 61.91... Other Than Radon From Department of Energy Facilities § 61.91 Definitions. As used in this subpart, all...

  20. 24 CFR 583.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM General § 583.5 Definitions. As used in this part: Applicant... definition, governmental entities include those that have general governmental powers (such as a city or... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Definitions. 583.5 Section 583.5...

  1. 32 CFR 148.12 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... POLICY AND IMPLEMENTATION OF RECIPROCITY OF FACILITIES Guidelines for the Implementation and Oversight of the Policy on Reciprocity of use and Inspections of Facilities § 148.12 Definitions. Agency. Any...

  2. 32 CFR 148.12 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLICY AND IMPLEMENTATION OF RECIPROCITY OF FACILITIES Guidelines for the Implementation and Oversight of the Policy on Reciprocity of use and Inspections of Facilities § 148.12 Definitions. Agency. Any...

  3. 32 CFR 148.12 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLICY AND IMPLEMENTATION OF RECIPROCITY OF FACILITIES Guidelines for the Implementation and Oversight of the Policy on Reciprocity of use and Inspections of Facilities § 148.12 Definitions. Agency. Any...

  4. 32 CFR 148.12 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLICY AND IMPLEMENTATION OF RECIPROCITY OF FACILITIES Guidelines for the Implementation and Oversight of the Policy on Reciprocity of use and Inspections of Facilities § 148.12 Definitions. Agency. Any...

  5. 32 CFR 148.12 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... POLICY AND IMPLEMENTATION OF RECIPROCITY OF FACILITIES Guidelines for the Implementation and Oversight of the Policy on Reciprocity of use and Inspections of Facilities § 148.12 Definitions. Agency. Any...

  6. NASA's Advanced Life Support Systems Human-Rated Test Facility

    NASA Technical Reports Server (NTRS)

    Henninger, D. L.; Tri, T. O.; Packham, N. J.

    1996-01-01

    Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.

  7. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  8. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  9. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    PubMed

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  10. Project Village conceptual plans. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming; proposed housing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less

  11. 24 CFR 598.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Definitions. 598.3 Section 598.3... COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS General Provisions § 598.3 Definitions. In addition to the definitions of “HUD” and “Secretary” found in 24 CFR 5.100, the following...

  12. 24 CFR 598.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Definitions. 598.3 Section 598.3... COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS General Provisions § 598.3 Definitions. In addition to the definitions of “HUD” and “Secretary” found in 24 CFR 5.100, the following...

  13. 24 CFR 598.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Definitions. 598.3 Section 598.3... COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS General Provisions § 598.3 Definitions. In addition to the definitions of “HUD” and “Secretary” found in 24 CFR 5.100, the following...

  14. 24 CFR 598.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Definitions. 598.3 Section 598.3... COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS General Provisions § 598.3 Definitions. In addition to the definitions of “HUD” and “Secretary” found in 24 CFR 5.100, the following...

  15. 24 CFR 598.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Definitions. 598.3 Section 598.3... COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS General Provisions § 598.3 Definitions. In addition to the definitions of “HUD” and “Secretary” found in 24 CFR 5.100, the following...

  16. 26 CFR 1.150-1A - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... single facility or related facilities are part of the same plan of financing; (B) Short-term bonds to... Definitions. (a) through (b) [Reserved]. For guidance see § 1.150-1. (c) Definition of issue—(1) In general... bond is treated as sold on its issue date. (ii) Sold pursuant to the same plan of financing. The bonds...

  17. Study protocol for the translating research in elder care (TREC): building context – an organizational monitoring program in long-term care project (project one)

    PubMed Central

    Estabrooks, Carole A; Squires, Janet E; Cummings, Greta G; Teare, Gary F; Norton, Peter G

    2009-01-01

    Background While there is a growing awareness of the importance of organizational context (or the work environment/setting) to successful knowledge translation, and successful knowledge translation to better patient, provider (staff), and system outcomes, little empirical evidence supports these assumptions. Further, little is known about the factors that enhance knowledge translation and better outcomes in residential long-term care facilities, where care has been shown to be suboptimal. The project described in this protocol is one of the two main projects of the larger five-year Translating Research in Elder Care (TREC) program. Aims The purpose of this project is to establish the magnitude of the effect of organizational context on knowledge translation, and subsequently on resident, staff (unregulated, regulated, and managerial) and system outcomes in long-term care facilities in the three Canadian Prairie Provinces (Alberta, Saskatchewan, Manitoba). Methods/Design This study protocol describes the details of a multi-level – including provinces, regions, facilities, units within facilities, and individuals who receive care (residents) or work (staff) in facilities – and longitudinal (five-year) research project. A stratified random sample of 36 residential long-term care facilities (30 urban and 6 rural) from the Canadian Prairie Provinces will comprise the sample. Caregivers and care managers within these facilities will be asked to complete the TREC survey – a suite of survey instruments designed to assess organizational context and related factors hypothesized to be important to successful knowledge translation and to achieving better resident, staff, and system outcomes. Facility and unit level data will be collected using standardized data collection forms, and resident outcomes using the Resident Assessment Instrument-Minimum Data Set version 2.0 instrument. A variety of analytic techniques will be employed including descriptive analyses

  18. [Psychiatric residential care facilities in the Puglia region. Phase 1 results of the PROGRES project].

    PubMed

    Germinario, Cinzia; Semisa, Domenico; Picoco, Fulvio; Prato, Rosa; Lopalco, Pietro Luigi; Quarto, Michele

    2004-01-01

    One of the more important aspects of the psychiatric care reform in Italy has been the opening of a great number of psychiatric Non-Hospital Residential Facilities (NHRF). However, 22 years have elapsed since the reform and there are still very scarce data regarding such facilities, the type of patients being accomodated, and the types of treatments provided. The "PROGRES" (PROGetto RESidenze - Residential Project) project is the first national study regarding NHRFs ever carried out in Italy. The objectives of "PROGRES" are to make a survey of all NHRFs in Italy (Phase 1) and to perform a detailed assessment of 20% of the surveyed facilities and of the type of patients being treated (Phase 2). This paper reports the survey (Phase 1) results for the Puglia Region. As of March 31, 2003, 113 psychiatric residential facilities were present in Puglia, with a total of 1.479 beds. This results in an average of 13,08 beds per facility and a rate of 3,86 beds per 10.000 inhabitants. The number of NHRFs present in the territory of each Local Health Unit in Puglia is very variable. Most NHRFs (57%) opened after January 1997. Eighty-three percent have a 24-hour staff coverage while only 5,3% has a 2-hour staff coverage. Eighty five percent of the residential facilities are financed by the Italian National Healthcare System, while a small percentage is privately funded. In over half (69,93%) of the NHRFs the predominant patient age group is 40-59 years; 26,4% of the residential facilities accommodate patients below age 40 and only 3,53% accommodate patients over 60 years old.

  19. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  20. 46 CFR 387.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROPERTY FOR DEVELOPMENT OR OPERATION OF A PORT FACILITY § 387.2 Definitions. (a) Act means the Federal... for development or operation of a port facility. (d) Grantee means the Applicant to which surplus Federal property is conveyed. (e) Grantor means the Secretary. (f) Port Facility means any structure and...

  1. 42 CFR 456.351 - Definition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Definition. As used in this subpart: Intermediate care facility services means those items and services furnished in an intermediate care facility as defined in §§ 440.140 and 440.150 of this subchapter, but...

  2. 42 CFR 456.351 - Definition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Definition. As used in this subpart: Intermediate care facility services means those items and services furnished in an intermediate care facility as defined in §§ 440.140 and 440.150 of this subchapter, but...

  3. 42 CFR 456.351 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Definition. As used in this subpart: Intermediate care facility services means those items and services furnished in an intermediate care facility as defined in §§ 440.140 and 440.150 of this subchapter, but...

  4. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  5. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  6. Enhancing resiliency for elderly populations : Shelter-in-place planning and training at facilities serving elderly populations through the Rhode Island Senior Resiliency Project.

    PubMed

    Smith, Richard; Mozzer, Michael; Albanese, Joseph; Paturas, James; Gold, Julia

    2017-06-01

    Elderly populations are disproportionately affected by disasters. In part, this is true because for many older adults, special assistance is needed to mitigate the consequences of disasters on their health and wellbeing. In addition, many older adults may reside in diverse living complexes such as long-term care facilities, assisted living facilities and independent-living senior housing complexes. Planning for each type of facility is different and the unique features of these facilities must be considered to develop readiness to deal with disasters. Based on this, the Rhode Island Department of Health established the Senior Resiliency Project to bolster the level of resiliency for the types of living facilities housing older adults. The project involves performing onsite assessments of energy resources, developing site-specific sheltering-inplace and energy resiliency plans, and educating and training facility employees and residents on these plans and steps they can take to be better prepared. Based on the feasibility of conducting these activities within a variety of facilities housing older adults, the project is segmented into three phases. This paper describes survey findings, outcomes of interventions, challenges and recommendations for bridging gaps observed in phases 1 and 2 of the project.

  7. Evaluation of Nuclear Facility Decommissioning Projects program: a reference test reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boing, L.E.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference test reactor (RTR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program. During the data extraction process no attempt was made to challenge any of the assumptions used in the original studies nor was any attempt made to update assumed methods or processes to state-of-the-art decommissioning techniques. In a few instances obvious errors were corrected after consultation with the studymore » author.« less

  8. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  9. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  11. Management aspects of Gemini's base facility operations project

    NASA Astrophysics Data System (ADS)

    Arriagada, Gustavo; Nitta, Atsuko; Adamson, A. J.; Nunez, Arturo; Serio, Andrew; Cordova, Martin

    2016-08-01

    Gemini's Base Facilities Operations (BFO) Project provided the capabilities to perform routine nighttime operations without anyone on the summit. The expected benefits were to achieve money savings and to become an enabler of the future development of remote operations. The project was executed using a tailored version of Prince2 project management methodology. It was schedule driven and managing it demanded flexibility and creativity to produce what was needed, taking into consideration all the constraints present at the time: Time available to implement BFO at Gemini North (GN), two years. The project had to be done in a matrix resources environment. There were only three resources assigned exclusively to BFO. The implementation of new capabilities had to be done without disrupting operations. And we needed to succeed, introducing the new operational model that implied Telescope and instrumentation Operators (Science Operations Specialists - SOS) relying on technology to assess summit conditions. To meet schedule we created a large number of concurrent smaller projects called Work Packages (WP). To be reassured that we would successfully implement BFO, we initially spent a good portion of time and effort, collecting and learning about user's needs. This was done through close interaction with SOSs, Observers, Engineers and Technicians. Once we had a clear understanding of the requirements, we took the approach of implementing the "bare minimum" necessary technology that would meet them and that would be maintainable in the long term. Another key element was the introduction of the "gradual descent" concept. In this, we increasingly provided tools to the SOSs and Observers to prevent them from going outside the control room during nighttime operations, giving them the opportunity of familiarizing themselves with the new tools over a time span of several months. Also, by using these tools at an early stage, Engineers and Technicians had more time for debugging

  12. 33 CFR 6.01-4 - Waterfront facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Waterfront facility. 6.01-4... PROTECTION AND SECURITY OF VESSELS, HARBORS, AND WATERFRONT FACILITIES Definitions § 6.01-4 Waterfront facility. Waterfront facility. “Waterfront facility,” as used in this part, means all piers, wharves, docks...

  13. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  14. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  15. State Requirements for Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document updates Florida's deregulation of construction of educational facilities guidelines, while keeping as the primary focus the safety of the students in pre-K through community college facilities. Organized by the sequence of steps required in the facilities procurement process, it covers general definitions, property…

  16. 18 CFR 37.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Definitions. 37.3... Definitions. (a) Transmission Provider means any public utility that owns, operates, or controls facilities used for the transmission of electric energy in interstate commerce. (b) Transmission Customer means...

  17. 24 CFR 573.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES LOAN GUARANTEE RECOVERY FUND § 573.2 Definitions. The following definitions are only... Investigation, shall determine whether an act of violence is a terrorist act or is reasonably believed to be a...

  18. 24 CFR 573.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES LOAN GUARANTEE RECOVERY FUND § 573.2 Definitions. The following definitions are only... Investigation, shall determine whether an act of violence is a terrorist act or is reasonably believed to be a...

  19. 14 CFR 158.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) General § 158.3 Definitions. The following definitions apply in this part... agency's PFC account. These costs may include reasonable monthly financial account charges and... revenue generated by a public airport (1) through any lease, rent, fee, PFC or other charge collected...

  20. Caregiver involvement in a large clinical systems project.

    PubMed Central

    Sales, S.; Mathews, P.; Gamblin, D.; Gee, S.

    1994-01-01

    The Kaiser Permanente Northern California Region (KPNCR) CareGiver Workstation (CGW) Project's mission is to develop and implement a clinical workstation system that will enhance each caregiver-member interaction and aid in the decision-making processes of direct patient care in the inpatient and outpatient settings. The requirements analysis approach for CareGiver Workstation (CGW) is based on the belief that extensive caregiver involvement will provide a better understanding of the diverse needs of Kaiser Permanente Northern California Region (KPNCR). In order to involve as many caregivers as reasonably possible, CGW included a 16 member caregiver core team and 6 different Medical Centers in the requirements definition process. The Medical Centers are referred to as "focus facilities". A "focus group" (caregiver team) at each selected focus facility consisted of a site coordinator and a 24-30 person multidisciplinary team involving physicians, nurses, therapists and other caregivers. The Medical Center selection process identified facilities that provided the best cross-sectional representation of KPNCR. The Lead Focus Facility participated in the initial round of requirements definition activities. These sessions assisted in the design of a simulation that was used at five additional Medical Centers to validate requirements. The five additional Focus Facilities participated in simulation review sessions. Feedback from these sessions was used to revise the simulation and update the requirements document. Caregivers from all six focus facilities and other identified groups participated in a requirements survey to assist CGW with identification of high priority features. Caregiver commitment and continuing involvement are essential for the success of CGW.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:7949953

  1. Detailed Facility Report Data Dictionary | ECHO | US EPA

    EPA Pesticide Factsheets

    The Detailed Facility Report Data Dictionary provides users with a list of the variables and definitions that have been incorporated into the Detailed Facility Report. The Detailed Facility Report provides a concise enforcement and compliance history for a facility.

  2. Shuttle mission simulator baseline definition report, volume 1

    NASA Technical Reports Server (NTRS)

    Burke, J. F.; Small, D. E.

    1973-01-01

    A baseline definition of the space shuttle mission simulator is presented. The subjects discussed are: (1) physical arrangement of the complete simulator system in the appropriate facility, with a definition of the required facility modifications, (2) functional descriptions of all hardware units, including the operational features, data demands, and facility interfaces, (3) hardware features necessary to integrate the items into a baseline simulator system to include the rationale for selecting the chosen implementation, and (4) operating, maintenance, and configuration updating characteristics of the simulator hardware.

  3. 42 CFR 456.520 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time Requirements § 456.520 Definitions... granted by the Administrator to the Medicaid agency for a specific remote facility to use time periods...

  4. 28 CFR 91.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES General § 91.2 Definitions... for purposes of the Uniform Crime Reports. If such data is unavailable, Bureau of Justice Statistics... facilities) and job skills programs, educational programs, a pre-release prisoner assessment to provide risk...

  5. 10 CFR 900.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Definitions. 900.3 Section 900.3 Energy DEPARTMENT OF ENERGY COORDINATION OF FEDERAL AUTHORIZATIONS FOR ELECTRIC TRANSMISSION FACILITIES § 900.3 Definitions.... Director means the Director of Permitting and Siting in the Office of Electricity Delivery and Energy...

  6. 24 CFR 570.500 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Definitions. 570.500 Section 570... DEVELOPMENT COMMUNITY FACILITIES COMMUNITY DEVELOPMENT BLOCK GRANTS Grant Administration § 570.500 Definitions... or by a subrecipient with CDBG funds, less costs incidental to generation of the income; (iv) Gross...

  7. 7 CFR 1280.624 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Facilities. 1280.624 Section 1280.624 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.624 Facilities. Each county FSA office...

  8. 7 CFR 1220.620 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Facilities. 1220.620 Section 1220.620 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... CONSUMER INFORMATION Procedures To Request a Referendum Definitions § 1220.620 Facilities. Each county FSA...

  9. 7 CFR 3570.53 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Definitions. 3570.53 Section 3570.53 Agriculture... COMMUNITY PROGRAMS Community Facilities Grant Program § 3570.53 Definitions. Agency. The Rural Housing... assistance. Poverty line. The level of income for a family of four as defined by section 673(2) of the...

  10. 42 CFR 456.351 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Definition. 456.351 Section 456.351 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Intermediate Care Facilities § 456.351 Definition. As used in this subpart: Intermediat...

  11. 42 CFR 456.351 - Definition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Definition. 456.351 Section 456.351 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Intermediate Care Facilities § 456.351 Definition. As used in this subpart: Intermediat...

  12. Conceptual design for the Space Station Freedom fluid physics/dynamics facility

    NASA Technical Reports Server (NTRS)

    Thompson, Robert L.; Chucksa, Ronald J.; Omalley, Terence F.; Oeftering, Richard C.

    1993-01-01

    A study team at NASA's Lewis Research Center has been working on a definition study and conceptual design for a fluid physics and dynamics science facility that will be located in the Space Station Freedom's baseline U.S. Laboratory module. This modular, user-friendly facility, called the Fluid Physics/Dynamics Facility, will be available for use by industry, academic, and government research communities in the late 1990's. The Facility will support research experiments dealing with the study of fluid physics and dynamics phenomena. Because of the lack of gravity-induced convection, research into the mechanisms of fluids in the absence of gravity will help to provide a better understanding of the fundamentals of fluid processes. This document has been prepared as a final version of the handout for reviewers at the Fluid Physics/Dynamics Facility Assessment Workshop held at Lewis on January 24 and 25, 1990. It covers the background, current status, and future activities of the Lewis Project Study Team effort. It is a revised and updated version of a document entitled 'Status Report on the Conceptual Design for the Space Station Fluid Physics/Dynamics Facility', dated January 1990.

  13. 24 CFR 247.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CERTAIN SUBSIDIZED AND HUD-OWNED PROJECTS Subsidized Projects § 247.2 Definitions. Drug-related criminal... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Definitions. 247.2 Section 247.2 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF...

  14. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. Metrology for decommissioning nuclear facilities: Partial outcomes of joint research project within the European Metrology Research Program.

    PubMed

    Suran, Jiri; Kovar, Petr; Smoldasova, Jana; Solc, Jaroslav; Van Ammel, Raf; Garcia Miranda, Maria; Russell, Ben; Arnold, Dirk; Zapata-García, Daniel; Boden, Sven; Rogiers, Bart; Sand, Johan; Peräjärvi, Kari; Holm, Philip; Hay, Bruno; Failleau, Guillaume; Plumeri, Stephane; Laurent Beck, Yves; Grisa, Tomas

    2018-04-01

    Decommissioning of nuclear facilities incurs high costs regarding the accurate characterisation and correct disposal of the decommissioned materials. Therefore, there is a need for the implementation of new and traceable measurement technologies to select the appropriate release or disposal route of radioactive wastes. This paper addresses some of the innovative outcomes of the project "Metrology for Decommissioning Nuclear Facilities" related to mapping of contamination inside nuclear facilities, waste clearance measurement, Raman distributed temperature sensing for long term repository integrity monitoring and validation of radiochemical procedures. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  17. 14 CFR 1204.1401 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Definitions. 1204.1401 Section 1204.1401 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION ADMINISTRATIVE AUTHORITY AND POLICY Use of... Landing Facility. The aeronautical facility which is a part of the John F. Kennedy Space Center (KSC...

  18. 10 CFR 451.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENERGY ENERGY CONSERVATION RENEWABLE ENERGY PRODUCTION INCENTIVES § 451.2 Definitions. As used in this... used at a qualified renewable energy facility to generate electricity. Date of first use means, at the... excludes electric energy used within the renewable energy facility to power equipment such as pumps, motors...

  19. 10 CFR 451.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENERGY ENERGY CONSERVATION RENEWABLE ENERGY PRODUCTION INCENTIVES § 451.2 Definitions. As used in this... used at a qualified renewable energy facility to generate electricity. Date of first use means, at the... excludes electric energy used within the renewable energy facility to power equipment such as pumps, motors...

  20. 10 CFR 451.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENERGY ENERGY CONSERVATION RENEWABLE ENERGY PRODUCTION INCENTIVES § 451.2 Definitions. As used in this... used at a qualified renewable energy facility to generate electricity. Date of first use means, at the... excludes electric energy used within the renewable energy facility to power equipment such as pumps, motors...

  1. 33 CFR 127.005 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... natural gas (LNG) means a liquid or semisolid consisting mostly of methane and small quantities of ethane...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS General § 127.005 Definitions. As used in this part: Active means accomplishing the transfer of LHG or LNG...

  2. 33 CFR 127.005 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... natural gas (LNG) means a liquid or semisolid consisting mostly of methane and small quantities of ethane...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS General § 127.005 Definitions. As used in this part: Active means accomplishing the transfer of LHG or LNG...

  3. 12 CFR 725.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATION CENTRAL LIQUIDITY FACILITY § 725.2 Definitions. As used in this part: (a) Agent means an Agent... loan means an advance of funds by an Agent to a member natural person credit union to meet liquidity... or Central Liquidity Facility means the National Credit Union Administration Central Liquidity...

  4. 42 CFR 447.251 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Definitions. 447.251 Section 447.251 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PAYMENTS FOR SERVICES Payment for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.251 Definitions....

  5. 42 CFR 447.251 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Definitions. 447.251 Section 447.251 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PAYMENTS FOR SERVICES Payment for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.251 Definitions....

  6. 42 CFR 447.251 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Definitions. 447.251 Section 447.251 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PAYMENTS FOR SERVICES Payment for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.251 Definitions....

  7. 42 CFR 447.251 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Definitions. 447.251 Section 447.251 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PAYMENTS FOR SERVICES Payment for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.251 Definitions....

  8. 42 CFR 447.251 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Definitions. 447.251 Section 447.251 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PAYMENTS FOR SERVICES Payment for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.251 Definitions....

  9. EERC pilot-scale CFBC evaluation facility Project CFB test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, M.D.; Hajicek, D.R.; Henderson, A.K.

    Project CFB was initiated at the University of North Dakota Energy and Environmental Research Center (EERC) in May 1988. Specific goals of the project were to (1) construct a circulating fluidized-bed combustor (CFBC) facility representative of the major boiler vendors' designs with the capability of producing scalable data, (2) develop a database for use in making future evaluations of CFBC technology, and (3) provide a facility for evaluating fuels, free of vendor bias for use in the - energy industry. Five coals were test-burned in the 1-MWth unit: North Dakota and Asian lignites, a Wyoming subbituminous, and Colorado and Pennsylvaniamore » bituminous coats. A total of 54 steady-state test periods were conducted, with the key test parameters being the average combustor temperature, excess air, superficial gas velocity, calcium-to-sulfur molar ratio, and the primary air-to-secondary air split. The capture for a coal fired in a CFBC is primarily dependent upon the total alkali-to-sulfur ratio. The required alkali-to ratio for 90% sulfur retention ranged from 1.4 to 4.9, depending upon coal type. While an alkali-to-ratio of 4.9 was required to meet 90% sulfur retention for the Salt Creek coal versus 1.4 for the Asian lignite, the total amount of sorbent addition required is much less for the Salt Creek coal, 4.2 pound sorbent per million Btu coal input, versus 62 pound/million Btu for the Asian lignite. The bituminous coals tested show optimal capture at combustor temperatures of approximately 1550[degree]F, with low-rank coals having optimal sulfur capture approximately 100[degree]F lower.« less

  10. 14 CFR 1203a.101 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA SECURITY AREAS § 1203a.101 Definitions. For the purpose of this part, the following definitions apply: (a) Security area. A physically defined area, established for the protection or security of facilities, property, or classfied information...

  11. 10 CFR 1706.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 1706.2 Section 1706.2 Energy DEFENSE NUCLEAR... with respect to its internal functions or its oversight of defense nuclear facilities, or otherwise to... party controls or can control both. Board means, as the context requires, the Defense Nuclear Facilities...

  12. 10 CFR 1706.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 1706.2 Section 1706.2 Energy DEFENSE NUCLEAR... with respect to its internal functions or its oversight of defense nuclear facilities, or otherwise to... party controls or can control both. Board means, as the context requires, the Defense Nuclear Facilities...

  13. 10 CFR 1706.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 1706.2 Section 1706.2 Energy DEFENSE NUCLEAR... with respect to its internal functions or its oversight of defense nuclear facilities, or otherwise to... party controls or can control both. Board means, as the context requires, the Defense Nuclear Facilities...

  14. 46 CFR 387.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROPERTY FOR DEVELOPMENT OR OPERATION OF A PORT FACILITY § 387.2 Definitions. (a) Act means the Federal... for development or operation of a port facility. (d) Grantee means the Applicant to which surplus..., which is used or intended for use in developing, transferring, or assisting maritime commerce and water...

  15. 46 CFR 387.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROPERTY FOR DEVELOPMENT OR OPERATION OF A PORT FACILITY § 387.2 Definitions. (a) Act means the Federal... for development or operation of a port facility. (d) Grantee means the Applicant to which surplus..., which is used or intended for use in developing, transferring, or assisting maritime commerce and water...

  16. 46 CFR 387.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROPERTY FOR DEVELOPMENT OR OPERATION OF A PORT FACILITY § 387.2 Definitions. (a) Act means the Federal... for development or operation of a port facility. (d) Grantee means the Applicant to which surplus..., which is used or intended for use in developing, transferring, or assisting maritime commerce and water...

  17. 46 CFR 387.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROPERTY FOR DEVELOPMENT OR OPERATION OF A PORT FACILITY § 387.2 Definitions. (a) Act means the Federal... for development or operation of a port facility. (d) Grantee means the Applicant to which surplus..., which is used or intended for use in developing, transferring, or assisting maritime commerce and water...

  18. 10 CFR 1705.02 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 1705.02 Section 1705.02 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PRIVACY ACT § 1705.02 Definitions. The following terms used in these regulations are defined in the Privacy Act, 5 U.S.C. 552a(a): agency, individual, maintain, record, system of...

  19. 10 CFR 1705.02 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 1705.02 Section 1705.02 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PRIVACY ACT § 1705.02 Definitions. The following terms used in these regulations are defined in the Privacy Act, 5 U.S.C. 552a(a): agency, individual, maintain, record, system of...

  20. 10 CFR 1705.02 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 1705.02 Section 1705.02 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PRIVACY ACT § 1705.02 Definitions. The following terms used in these regulations are defined in the Privacy Act, 5 U.S.C. 552a(a): agency, individual, maintain, record, system of...

  1. 42 CFR 57.302 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 57.302 Section 57.302 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Nursing Student Loans § 57.302 Definitions. As used in this subpart: Academi...

  2. 42 CFR 57.302 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 57.302 Section 57.302 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Nursing Student Loans § 57.302 Definitions. As used in this subpart: Academi...

  3. 42 CFR 57.302 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 57.302 Section 57.302 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Nursing Student Loans § 57.302 Definitions. As used in this subpart: Academi...

  4. 42 CFR 57.302 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 57.302 Section 57.302 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Nursing Student Loans § 57.302 Definitions. As used in this subpart: Academi...

  5. 10 CFR 1705.02 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Definitions. 1705.02 Section 1705.02 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PRIVACY ACT § 1705.02 Definitions. The following terms used in these regulations are defined in the Privacy Act, 5 U.S.C. 552a(a): agency, individual, maintain, record, system of...

  6. 10 CFR 1705.02 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Definitions. 1705.02 Section 1705.02 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PRIVACY ACT § 1705.02 Definitions. The following terms used in these regulations are defined in the Privacy Act, 5 U.S.C. 552a(a): agency, individual, maintain, record, system of...

  7. 40 CFR 266.201 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Military Munitions § 266.201 Definitions. In addition to the definitions in 40 CFR 260.10, the... service and is being regularly used for range activities. Chemical agents and munitions are defined as in 50 U.S.C. section 1521(j)(1). Director is as defined in 40 CFR 270.2. Explosives or munitions...

  8. 40 CFR 266.201 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Military Munitions § 266.201 Definitions. In addition to the definitions in 40 CFR 260.10, the... service and is being regularly used for range activities. Chemical agents and munitions are defined as in 50 U.S.C. section 1521(j)(1). Director is as defined in 40 CFR 270.2. Explosives or munitions...

  9. 40 CFR 266.201 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Military Munitions § 266.201 Definitions. In addition to the definitions in 40 CFR 260.10, the... service and is being regularly used for range activities. Chemical agents and munitions are defined as in 50 U.S.C. section 1521(j)(1). Director is as defined in 40 CFR 270.2. Explosives or munitions...

  10. 40 CFR 266.201 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Military Munitions § 266.201 Definitions. In addition to the definitions in 40 CFR 260.10, the... service and is being regularly used for range activities. Chemical agents and munitions are defined as in 50 U.S.C. section 1521(j)(1). Director is as defined in 40 CFR 270.2. Explosives or munitions...

  11. 34 CFR 108.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACCESS TO PUBLIC SCHOOL FACILITIES FOR THE BOY SCOUTS OF AMERICA AND OTHER DESIGNATED YOUTH GROUPS § 108.3 Definitions. The following definitions apply to this part: (a) Act means the Boy Scouts of America.... 7905). (b) Boy Scouts means the organization named “Boy Scouts of America,” which has a Federal charter...

  12. 34 CFR 108.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCESS TO PUBLIC SCHOOL FACILITIES FOR THE BOY SCOUTS OF AMERICA AND OTHER DESIGNATED YOUTH GROUPS § 108.3 Definitions. The following definitions apply to this part: (a) Act means the Boy Scouts of America.... 7905). (b) Boy Scouts means the organization named “Boy Scouts of America,” which has a Federal charter...

  13. 34 CFR 108.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCESS TO PUBLIC SCHOOL FACILITIES FOR THE BOY SCOUTS OF AMERICA AND OTHER DESIGNATED YOUTH GROUPS § 108.3 Definitions. The following definitions apply to this part: (a) Act means the Boy Scouts of America.... 7905). (b) Boy Scouts means the organization named “Boy Scouts of America,” which has a Federal charter...

  14. 34 CFR 108.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCESS TO PUBLIC SCHOOL FACILITIES FOR THE BOY SCOUTS OF AMERICA AND OTHER DESIGNATED YOUTH GROUPS § 108.3 Definitions. The following definitions apply to this part: (a) Act means the Boy Scouts of America.... 7905). (b) Boy Scouts means the organization named “Boy Scouts of America,” which has a Federal charter...

  15. 34 CFR 108.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCESS TO PUBLIC SCHOOL FACILITIES FOR THE BOY SCOUTS OF AMERICA AND OTHER DESIGNATED YOUTH GROUPS § 108.3 Definitions. The following definitions apply to this part: (a) Act means the Boy Scouts of America.... 7905). (b) Boy Scouts means the organization named “Boy Scouts of America,” which has a Federal charter...

  16. 24 CFR 990.115 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...

  17. 24 CFR 990.115 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...

  18. 24 CFR 990.115 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...

  19. 24 CFR 990.115 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...

  20. 24 CFR 990.115 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...

  1. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  2. Industrial waste water in Bangkok, Thailand: Definitional mission report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pfrang, W.

    A definitional mission visited Thailand between February 1 and 7, 1992 to study the market opportunities for US manufacturers in providing pollution control equipment. Thailand presently lacks industrial machinery required for pollution control equipment. Consequently, this equipment must be imported for both industrial and municipal waste treatment facilities. The US has both the applicable technology and manufactured goods to serve the market. There is, however, stiff competition from Europe and especially Japan, who offer financial assistance at preferential rates for these types of projects.

  3. 46 CFR 4.03-5 - Medical facility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...

  4. 46 CFR 4.03-5 - Medical facility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...

  5. 46 CFR 4.03-5 - Medical facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...

  6. 46 CFR 4.03-5 - Medical facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...

  7. 46 CFR 4.03-5 - Medical facility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...

  8. 14 CFR 171.303 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FACILITIES NON-FEDERAL NAVIGATION FACILITIES Microwave Landing System (MLS) § 171.303 Definitions. As used in... operation of the landing guidance system. Beam center means the midpoint between the -3 dB points on the... main lobe measured at the -3 dB points and defined in angular units on the boresight, in the horizontal...

  9. 14 CFR 171.303 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FACILITIES NON-FEDERAL NAVIGATION FACILITIES Microwave Landing System (MLS) § 171.303 Definitions. As used in... operation of the landing guidance system. Beam center means the midpoint between the -3 dB points on the... main lobe measured at the -3 dB points and defined in angular units on the boresight, in the horizontal...

  10. 14 CFR 171.303 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... FACILITIES NON-FEDERAL NAVIGATION FACILITIES Microwave Landing System (MLS) § 171.303 Definitions. As used in... operation of the landing guidance system. Beam center means the midpoint between the -3 dB points on the... main lobe measured at the -3 dB points and defined in angular units on the boresight, in the horizontal...

  11. 14 CFR 171.303 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FACILITIES NON-FEDERAL NAVIGATION FACILITIES Microwave Landing System (MLS) § 171.303 Definitions. As used in... operation of the landing guidance system. Beam center means the midpoint between the -3 dB points on the... main lobe measured at the -3 dB points and defined in angular units on the boresight, in the horizontal...

  12. 14 CFR 171.303 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FACILITIES NON-FEDERAL NAVIGATION FACILITIES Microwave Landing System (MLS) § 171.303 Definitions. As used in... operation of the landing guidance system. Beam center means the midpoint between the -3 dB points on the... main lobe measured at the -3 dB points and defined in angular units on the boresight, in the horizontal...

  13. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  14. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  16. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  17. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  18. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  19. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  20. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  1. The global lambda visualization facility: An international ultra-high-definition wide-area visualization collaboratory

    USGS Publications Warehouse

    Leigh, J.; Renambot, L.; Johnson, Aaron H.; Jeong, B.; Jagodic, R.; Schwarz, N.; Svistula, D.; Singh, R.; Aguilera, J.; Wang, X.; Vishwanath, V.; Lopez, B.; Sandin, D.; Peterka, T.; Girado, J.; Kooima, R.; Ge, J.; Long, L.; Verlo, A.; DeFanti, T.A.; Brown, M.; Cox, D.; Patterson, R.; Dorn, P.; Wefel, P.; Levy, S.; Talandis, J.; Reitzer, J.; Prudhomme, T.; Coffin, T.; Davis, B.; Wielinga, P.; Stolk, B.; Bum, Koo G.; Kim, J.; Han, S.; Corrie, B.; Zimmerman, T.; Boulanger, P.; Garcia, M.

    2006-01-01

    The research outlined in this paper marks an initial global cooperative effort between visualization and collaboration researchers to build a persistent virtual visualization facility linked by ultra-high-speed optical networks. The goal is to enable the comprehensive and synergistic research and development of the necessary hardware, software and interaction techniques to realize the next generation of end-user tools for scientists to collaborate on the global Lambda Grid. This paper outlines some of the visualization research projects that were demonstrated at the iGrid 2005 workshop in San Diego, California.

  2. 18 CFR 281.203 - Definitions and cross references.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... power generation. (10) Hospital means a facility, the primary function of which is delivering medical... clinics or doctors' offices are not included in this definition. (11) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  3. 18 CFR 281.203 - Definitions and cross references.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... power generation. (10) Hospital means a facility, the primary function of which is delivering medical... clinics or doctors' offices are not included in this definition. (11) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  4. 18 CFR 281.203 - Definitions and cross references.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... power generation. (10) Hospital means a facility, the primary function of which is delivering medical... clinics or doctors' offices are not included in this definition. (11) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  5. 18 CFR 281.203 - Definitions and cross references.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... power generation. (10) Hospital means a facility, the primary function of which is delivering medical... clinics or doctors' offices are not included in this definition. (11) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  6. 18 CFR 281.203 - Definitions and cross references.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... power generation. (10) Hospital means a facility, the primary function of which is delivering medical... clinics or doctors' offices are not included in this definition. (11) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  7. 42 CFR 456.520 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time Requirements § 456.520 Definitions...

  8. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  9. Report: American Recovery and Reinvestment Act Site Visit of the Wastewater Treatment Facility Improvements Project, Perkins, Oklahoma

    EPA Pesticide Factsheets

    Report #11-R-0214, May 2, 2011. We conducted an unannounced visit of the construction site of the Perkins Public Works Authority’s wastewater treatment facility improvements project in Perkins, Oklahoma, on April 19–22, 2010.

  10. Energy Savings and Sustainability Opportunities at US Army Corps of Engineers Facilities: A Guide to Identify, Prioritize, and Estimate Projects at Complexes That Have Not Conducted a Facility-Level Energy and Water Evaluation

    DTIC Science & Technology

    2012-06-16

    Engineers to help identify and develop energy and water conservation projects in the facilities for which they are responsible. DISCLAIMER: The...and water throughout their facility. To identify energy and water conservation measures (ECMs), an energy manager would generally start by performing...an Energy and Water Conservation Assessment, essentially a facility-level evaluation of the en- ergy and water consuming equipment and systems that

  11. 40 CFR 61.121 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Elemental Phosphorus Plants § 61.121 Definitions. (a) Elemental phosphorus plant or plant means any facility that processes phosphate rock to produce elemental phosphorus. A plant includes all buildings...

  12. 40 CFR 61.121 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Elemental Phosphorus Plants § 61.121 Definitions. (a) Elemental phosphorus plant or plant means any facility that processes phosphate rock to produce elemental phosphorus. A plant includes all buildings...

  13. 40 CFR 239.2 - Scope and definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action, and financial assurance of Subtitle D regulated facilities. Permit documents means permit...) regulated facilities under the state's jurisdiction. (b) Definitions. (1) For purposes of this part... regulated under section 4010(c) of Subtitle D of RCRA comply with the requirements of the approved state...

  14. 34 CFR 608.4 - What definitions apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What definitions apply? 608.4 Section 608.4 Education... What definitions apply? (a) Definitions in EDGAR. The following terms used in this part are defined in... Project period Public Secretary (b) Other definitions. The following definitions also apply to this part...

  15. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  16. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  17. Waste receiving and processing facility module 1 data management system software project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  18. 47 CFR 4.5 - Definitions of outage, special offices and facilities, and 911 special facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities, and 911 special facilities. 4.5 Section 4.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL DISRUPTIONS TO COMMUNICATIONS Reporting Requirements for Disruptions to Communications § 4.5... significant degradation in the ability of an end user to establish and maintain a channel of communications as...

  19. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2007-09-16

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility was used in the early to mid-1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles in the immediate area. Identified as Corrective Action Unit 115, the TCA facility was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the ''Federal Facilitymore » Agreement and Consent Order''. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously provided technical decisions are made by an experienced decision maker within the site conceptual site model, identified in the Data Quality Objective process. Facility closure involved a seven-step decommissioning strategy. Key lessons learned from the project included: (1) Targeted preliminary investigation activities provided a more solid technical approach, reduced surprises and scope creep, and made the working environment safer for the D&D worker. (2) Early identification of risks and uncertainties provided opportunities for risk management and mitigation planning to address challenges and unanticipated conditions. (3) Team reviews provided an excellent mechanism to consider all aspects of the task, integrated safety into activity performance, increase team unity and ''buy-in'' and promoted innovative and time saving ideas. (4) Development of CED protocols ensured safety and control. (5) The same proven D&D strategy is now being employed on the larger ''sister'' facility, Test Cell C.« less

  20. 30 CFR 285.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651... facilities on my limited lease or any facilities on my project easement proposed under my GAP? If you are...

  1. 32 CFR 766.2 - Definition of terms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Definition of terms. 766.2 Section 766.2 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES USE OF DEPARTMENT OF THE NAVY AVIATION FACILITIES BY CIVIL AIRCRAFT § 766.2 Definition of terms. For the purpose of...

  2. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  3. Concept definition study for an extremely large aerophysics range facility

    NASA Technical Reports Server (NTRS)

    Swift, H.; Witcofski, R.

    1992-01-01

    The development of a large aerophysical ballistic range facility is considered to study large-scale hypersonic flows at high Reynolds numbers for complex shapes. A two-stage light gas gun is considered for the hypervelocity launcher, and the extensive range tankage is discussed with respect to blast suppression, model disposition, and the sabot impact tank. A layout is given for the large aerophysics facility, and illustrations are provided for key elements such as the guide rail. The paper shows that such a facility could be used to launch models with diameters approaching 250 mm at velocities of 6.5 km/s with peak achievable accelerations of not more than 85.0 kgs. The envisioned range would provide gas-flow facilities capable of controlling the modeled quiescent atmospheric conditions. The facility is argued to be a feasible and important step in the investigation and experiment of such hypersonic vehicles as the National Aerospace Plane.

  4. 40 CFR 266.202 - Definition of solid waste.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Definition of solid waste. 266.202 Section 266.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Military Munitions § 266.202 Definition of solid waste. (a) A military munition is not...

  5. 40 CFR 266.202 - Definition of solid waste.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Definition of solid waste. 266.202 Section 266.202 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... MANAGEMENT FACILITIES Military Munitions § 266.202 Definition of solid waste. (a) A military munition is not...

  6. 26 CFR 1.168A-4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Definitions. 1.168A-4 Section 1.168A-4 Internal... TAXES (CONTINUED) Itemized Deductions for Individuals and Corporations § 1.168A-4 Definitions. As used... authority designated by the President by Executive order. (b) “Emergency facility” means any facility, land...

  7. Supercritical Carbon Dioxide Power Generation System Definition: Concept Definition and Capital Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoddard, Larry; Galluzzo, Geoff; Andrew, Daniel

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO hasmore » a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and 30 percent further reductions by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO 2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately

  8. Multimodal Transportation Facility Resilience Index

    DOT National Transportation Integrated Search

    2017-03-21

    A new paradigm for complex systems performance and maintenance decision making is developing in the form of resilience engineering. Depending on the subject area, different definitions of resilience exist. In this project, we adopt a definition appro...

  9. Standardization of definitions in focal therapy of prostate cancer: report from a Delphi consensus project.

    PubMed

    Postema, A W; De Reijke, T M; Ukimura, O; Van den Bos, W; Azzouzi, A R; Barret, E; Baumunk, D; Blana, A; Bossi, A; Brausi, M; Coleman, J A; Crouzet, S; Dominguez-Escrig, J; Eggener, S; Ganzer, R; Ghai, S; Gill, I S; Gupta, R T; Henkel, T O; Hohenfellner, M; Jones, J S; Kahmann, F; Kastner, C; Köhrmann, K U; Kovacs, G; Miano, R; van Moorselaar, R J; Mottet, N; Osorio, L; Pieters, B R; Polascik, T J; Rastinehad, A R; Salomon, G; Sanchez-Salas, R; Schostak, M; Sentker, L; Tay, K J; Varkarakis, I M; Villers, A; Walz, J; De la Rosette, J J

    2016-10-01

    To reach standardized terminology in focal therapy (FT) for prostate cancer (PCa). A four-stage modified Delphi consensus project was undertaken among a panel of international experts in the field of FT for PCa. Data on terminology in FT was collected from the panel by three rounds of online questionnaires. During a face-to-face meeting on June 21, 2015, attended by 38 experts, all data from the online rounds were reviewed and recommendations for definitions were formulated. Consensus was attained on 23 of 27 topics; Targeted FT was defined as a lesion-based treatment strategy, treating all identified significant cancer foci; FT was generically defined as an anatomy-based (zonal) treatment strategy. Treatment failure due to the ablative energy inadequately destroying treated tissue is defined as ablation failure. In targeting failure the energy is not adequately applied to the tumor spatially and selection failure occurs when a patient was wrongfully selected for FT. No definition of biochemical recurrence can be recommended based on the current data. Important definitions for outcome measures are potency (minimum IIEF-5 score of 21), incontinence (new need for pads or leakage) and deterioration in urinary function (increase in IPSS >5 points). No agreement on the best quality of life tool was established, but UCLA-EPIC and EORTC-QLQ-30 were most commonly supported by the experts. A complete overview of statements is presented in the text. Focal therapy is an emerging field of PCa therapeutics. Standardization of definitions helps to create comparable research results and facilitate clear communication in clinical practice.

  10. Making of the NSTX Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. Neumeyer; M. Ono; S.M. Kaye

    1999-11-01

    The NSTX (National Spherical Torus Experiment) facility located at Princeton Plasma Physics Laboratory is the newest national fusion science experimental facility for the restructured US Fusion Energy Science Program. The NSTX project was approved in FY 97 as the first proof-of-principle national fusion facility dedicated to the spherical torus research. On Feb. 15, 1999, the first plasma was achieved 10 weeks ahead of schedule. The project was completed on budget and with an outstanding safety record. This paper gives an overview of the NSTX facility construction and the initial plasma operations.

  11. Space Infrared Telescope Facility (SIRTF) science instruments

    NASA Technical Reports Server (NTRS)

    Ramos, R.; Hing, S. M.; Leidich, C. A.; Fazio, G.; Houck, J. R.

    1989-01-01

    Concepts of scientific instruments designed to perform infrared astronomical tasks such as imaging, photometry, and spectroscopy are discussed as part of the Space Infrared Telescope Facility (SIRTF) project under definition study at NASA/Ames Research Center. The instruments are: the multiband imaging photometer, the infrared array camera, and the infrared spectograph. SIRTF, a cryogenically cooled infrared telescope in the 1-meter range and wavelengths as short as 2.5 microns carrying multiple instruments with high sensitivity and low background performance, provides the capability to carry out basic astronomical investigations such as deep search for very distant protogalaxies, quasi-stellar objects, and missing mass; infrared emission from galaxies; star formation and the interstellar medium; and the composition and structure of the atmospheres of the outer planets in the solar sytem.

  12. [Educational Facilities for Pregnant School-Age Girls in Districts 3, 4, 12, 13, and 18. Project No. 1369. Evaluation of ESEA Title I Projects in New York City 1968-69.

    ERIC Educational Resources Information Center

    Appel, Yetta; Berken, Ruth R.

    This project for pregnant school age girls is an ESEA Title I program operating in five facilities in Manhattan, Bronx, and Brooklyn. The primary objective of the project was to assist pregnant school age girls complete their education by being able to attend school. Additional objectives included provision of information and training in personal…

  13. 47 CFR 95.1103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES Wireless Medical Telemetry Service (WMTS) General Provisions § 95.1103 Definitions. (a) Authorized... in rendering medical treatment, and institutions and organizations regularly engaged in providing medical services through clinics, public health facilities, and similar establishments, including...

  14. Materials sciences research. [research facilities, research projects, and technical reports of materials tests

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Research projects involving materials research conducted by various international test facilities are reported. Much of the materials research is classified in the following areas: (1) acousto-optic, acousto-electric, and ultrasonic research, (2) research for elucidating transport phenomena in well characterized oxides, (3) research in semiconductor materials and semiconductor devices, (4) the study of interfaces and interfacial phenomena, and (5) materials research relevant to natural resources. Descriptions of the individual research programs are listed alphabetically by the name of the author and show all personnel involved, resulting publications, and associated meeting speeches.

  15. Fifteen-foot diameter modular space station Kennedy Space Center launch site support definition (space station program Phase B extension definition)

    NASA Technical Reports Server (NTRS)

    Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V

    1971-01-01

    This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.

  16. Project for the development of the linac based NCT facility in University of Tsukuba.

    PubMed

    Kumada, H; Matsumura, A; Sakurai, H; Sakae, T; Yoshioka, M; Kobayashi, H; Matsumoto, H; Kiyanagi, Y; Shibata, T; Nakashima, H

    2014-06-01

    A project team headed by University of Tsukuba launched the development of a new accelerator based BNCT facility. In the project, we have adopted Radio-Frequency Quadrupole (RFQ)+Drift Tube Linac (DTL) type linac as proton accelerators. Proton energy generated from the linac was set to 8MeV and average current was 10mA. The linac tube has been constructed by Mitsubishi Heavy Industry Co. For neutron generator device, beryllium is selected as neutron target material; high intensity neutrons are generated by the reaction with beryllium and the 80kW proton beam. Our team chose beryllium as the neutron target material. At present beryllium target system is being designed with Monte-Carlo estimations and heat analysis with ANSYS. The neutron generator consists of moderator, collimator and shielding. It is being designed together with the beryllium target system. We also acquired a building in Tokai village; the building has been renovated for use as BNCT treatment facility. It is noteworthy that the linac tube had been installed in the facility in September 2012. In BNCT procedure, several medical devices are required for BNCT treatment such as treatment planning system, patient positioning device and radiation monitors. Thus these are being developed together with the linac based neutron source. For treatment planning system, we are now developing a new multi-modal Monte-Carlo treatment planning system based on JCDS. The system allows us to perform dose estimation for BNCT as well as particle radiotherapy and X-ray therapy. And the patient positioning device can navigate a patient to irradiation position quickly and properly. Furthermore the device is able to monitor movement of the patient׳s position during irradiation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. 36 CFR 215.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., AND APPEAL PROCEDURES FOR NATIONAL FOREST SYSTEM PROJECTS AND ACTIVITIES § 215.2 Definitions. Address... specific project or activity. Categorically excluded (CE)—Proposed actions, which do not individually or... Responsible Official on a proposed action subject to this part, except for projects requiring an EIS which...

  18. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  19. Optimizing charge breeding techniques for ISOL facilities in Europe: Conclusions from the EMILIE project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delahaye, P., E-mail: delahaye@ganil.fr; Jardin, P.; Maunoury, L.

    The present paper summarizes the results obtained from the past few years in the framework of the Enhanced Multi-Ionization of short-Lived Isotopes for Eurisol (EMILIE) project. The EMILIE project aims at improving the charge breeding techniques with both Electron Cyclotron Resonance Ion Sources (ECRIS) and Electron Beam Ion Sources (EBISs) for European Radioactive Ion Beam (RIB) facilities. Within EMILIE, an original technique for debunching the beam from EBIS charge breeders is being developed, for making an optimal use of the capabilities of CW post-accelerators of the future facilities. Such a debunching technique should eventually resolve duty cycle and time structuremore » issues which presently complicate the data-acquisition of experiments. The results of the first tests of this technique are reported here. In comparison with charge breeding with an EBIS, the ECRIS technique had lower performance in efficiency and attainable charge state for metallic ion beams and also suffered from issues related to beam contamination. In recent years, improvements have been made which significantly reduce the differences between the two techniques, making ECRIS charge breeding more attractive especially for CW machines producing intense beams. Upgraded versions of the Phoenix charge breeder, originally developed by LPSC, will be used at SPES and GANIL/SPIRAL. These two charge breeders have benefited from studies undertaken within EMILIE, which are also briefly summarized here.« less

  20. NASA thesaurus. Volume 3: Definitions

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Publication of NASA Thesaurus definitions began with Supplement 1 to the 1985 NASA Thesaurus. The definitions given here represent the complete file of over 3,200 definitions, complimented by nearly 1,000 use references. Definitions of more common or general scientific terms are given a NASA slant if one exists. Certain terms are not defined as a matter of policy: common names, chemical elements, specific models of computers, and nontechnical terms. The NASA Thesaurus predates by a number of years the systematic effort to define terms, therefore not all Thesaurus terms have been defined. Nevertheless, definitions of older terms are continually being added. The following data are provided for each entry: term in uppercase/lowercase form, definition, source, and year the term (not the definition) was added to the NASA Thesaurus. The NASA History Office is the authority for capitalization in satellite and spacecraft names. Definitions with no source given were constructed by lexicographers at the NASA Scientific and Technical Information (STI) Facility who rely on the following sources for their information: experts in the field, literature searches from the NASA STI database, and specialized references.

  1. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  2. Astronomic Telescope Facility: Preliminary systems definition study report. Volume 2: Technical description

    NASA Technical Reports Server (NTRS)

    Sobeck, Charlie (Editor)

    1987-01-01

    The Astrometric Telescope Facility (AFT) is to be an earth-orbiting facility designed specifically to measure the change in relative position of stars. The primary science investigation for the facility will be the search for planets and planetary systems outside the solar system. In addition the facility will support astrophysics investigations dealing with the location or motions of stars. The science objective and facility capabilities for astrophysics investigations are discussed.

  3. Facilities for US Radioastronomy.

    ERIC Educational Resources Information Center

    Thaddeus, Patrick

    1982-01-01

    Discusses major developments in radioastronomy since 1945. Topics include proposed facilities, very-long-baseline interferometric array, millimeter-wave telescope, submillimeter-wave telescope, and funding for radioastronomy facilities and projects. (JN)

  4. 24 CFR 574.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the building after rehabilitation. Population means total resident population based on data compiled... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES HOUSING OPPORTUNITIES FOR PERSONS WITH AIDS General § 574.3 Definitions. The terms...

  5. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  6. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  7. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  8. 47 CFR 95.1103 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PERSONAL RADIO SERVICES Wireless Medical Telemetry Service (WMTS) General Provisions § 95.1103 Definitions. (a) Authorized... facility does not include an ambulance or other moving vehicle. (c) Wireless medical telemetry. The...

  9. 34 CFR 675.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accessible to the community), literacy training, education (including tutorial services), welfare, social..., security, and social, health, and tutorial services. Student services do not have to be direct or involve personal interaction with students. For purposes of this definition, facility maintenance, cleaning...

  10. 40 CFR 61.121 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radionuclide Emissions From Elemental Phosphorus Plants § 61.121 Definitions. (a) Elemental phosphorus plant or plant means any facility...

  11. 7 CFR 1942.304 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Definitions. 1942.304 Section 1942.304 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... § 1942.304 Definitions. Project. For rural business enterprise grants, the result of the use of program...

  12. Empowering Facilities Teams through Technology

    ERIC Educational Resources Information Center

    Cormier, Scott

    2013-01-01

    Facilities departments at colleges and universities are facing the same challenge: how not to do just the most projects, but also the right projects with the limited funds they are given. In order to make the best decisions, they need more control over the capital planning process, which requires accurate, current facility condition data. Each…

  13. Space Communications Emulation Facility

    NASA Technical Reports Server (NTRS)

    Hill, Chante A.

    2004-01-01

    Establishing space communication between ground facilities and other satellites is a painstaking task that requires many precise calculations dealing with relay time, atmospheric conditions, and satellite positions, to name a few. The Space Communications Emulation Facility (SCEF) team here at NASA is developing a facility that will approximately emulate the conditions in space that impact space communication. The emulation facility is comprised of a 32 node distributed cluster of computers; each node representing a satellite or ground station. The objective of the satellites is to observe the topography of the Earth (water, vegetation, land, and ice) and relay this information back to the ground stations. Software originally designed by the University of Kansas, labeled the Emulation Manager, controls the interaction of the satellites and ground stations, as well as handling the recording of data. The Emulation Manager is installed on a Linux Operating System, employing both Java and C++ programming codes. The emulation scenarios are written in extensible Markup Language, XML. XML documents are designed to store, carry, and exchange data. With XML documents data can be exchanged between incompatible systems, which makes it ideal for this project because Linux, MAC and Windows Operating Systems are all used. Unfortunately, XML documents cannot display data like HTML documents. Therefore, the SCEF team uses XML Schema Definition (XSD) or just schema to describe the structure of an XML document. Schemas are very important because they have the capability to validate the correctness of data, define restrictions on data, define data formats, and convert data between different data types, among other things. At this time, in order for the Emulation Manager to open and run an XML emulation scenario file, the user must first establish a link between the schema file and the directory under which the XML scenario files are saved. This procedure takes place on the command

  14. 28 CFR 91.52 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Definitions. 91.52 Section 91.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review... on Environmental Quality in its Regulations for Implementing the Procedural Provisions of the...

  15. 28 CFR 91.52 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Definitions. 91.52 Section 91.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review... on Environmental Quality in its Regulations for Implementing the Procedural Provisions of the...

  16. 28 CFR 91.52 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Definitions. 91.52 Section 91.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review... on Environmental Quality in its Regulations for Implementing the Procedural Provisions of the...

  17. 28 CFR 91.52 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Definitions. 91.52 Section 91.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review... on Environmental Quality in its Regulations for Implementing the Procedural Provisions of the...

  18. 28 CFR 91.52 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Definitions. 91.52 Section 91.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review... on Environmental Quality in its Regulations for Implementing the Procedural Provisions of the...

  19. 10 CFR 1706.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.2 Definitions. Advisory... health and safety practices or other appropriate services. Affiliates means associated business concerns... organizational or consultant conflict of interest, reducing or counteracting the effects of such a conflict of...

  20. 47 CFR 76.1500 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1500 Definitions. (a) Open video system. A facility... that is designed to provide cable service which includes video programming and which is provided to...

  1. 47 CFR 76.1500 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1500 Definitions. (a) Open video system. A facility... that is designed to provide cable service which includes video programming and which is provided to...

  2. Definitional-mission report: Clean-coal-technology assistance project in Poland (final report). Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shrivastava, V.K.

    1992-01-01

    The new impending environmental law in Poland provides for strict environmental guidelines for coal preparation, washing, mine desalination, and application of commercially viable and economical clean coal technologies for utilization of coal. The government of Poland requested the U.S. Trade and Development Program (TDP) carry out a Definitional Mission to Poland to define the requirements of the Polish authorities and to prepare specific recommendations for follow on actions by TDP. The technical assistance package proposed to be funded by TDP includes two specific activities. These are (i) an orientation visit to review selected clean coal technology projects in the U.S.,more » and (ii) preparation of a compendium of the main coal sector requirements in Poland and the types of technologies needed. The Definitional Mission has prepared a Scope of Work which recommends that TDP allocate a fund to finance the cost of the above technical assistance activities. It is further recommended that TDP enlist the assistance of a non-profit trade organization to provide this assistance to the Polish government.« less

  3. Complementary and Integrative Healthcare in a Long-term Care Facility: A Pilot Project.

    PubMed

    Evans, Roni; Vihstadt, Corrie; Westrom, Kristine; Baldwin, Lori

    2015-01-01

    The world's population is aging quickly, leading to increased challenges of how to care for individuals who can no longer independently care for themselves. With global social and economic pressures leading to declines in family support, increased reliance is being placed on community- and government-based facilities to provide long-term care (LTC) for many of society's older citizens. Complementary and integrative healthcare (CIH) is commonly used by older adults and may offer an opportunity to enhance LTC residents' wellbeing. Little work has been done, however, rigorously examining the safety and effectiveness of CIH for LTC residents. The goal of this work is to describe a pilot project to develop and evaluate one model of CIH in an LTC facility in the Midwestern United States. A prospective, mixed-methods pilot project was conducted in two main phases: (1) preparation and (2) implementation and evaluation. The preparation phase entailed assessment, CIH model design and development, and training. A CIH model including acupuncture, chiropractic, and massage therapy, guided by principles of collaborative integration, evidence informed practice, and sustainability, was applied in the implementation and evaluation phase. CIH services were provided for 16 months in the LTC facility. Quantitative data collection included pain, quality of life, and adverse events. Qualitative interviews of LTC residents, their family members, and LTC staff members queried perceptions of CIH services. A total of 46 LTC residents received CIH care, most commonly for musculoskeletal pain (61%). Participants were predominantly female (85%) and over the age of 80 years (67%). The median number of CIH treatments was 13, with a range of 1 to 92. Residents who were able to provide self-report data demonstrated, on average, a 15% decline in pain and a 4% improvement in quality of life. No serious adverse events related to treatment were documented; the most common mild and expected side effect

  4. 33 CFR 279.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Definitions. 279.4 Section 279.4... USE: ESTABLISHMENT OF OBJECTIVES § 279.4 Definitions. For the purposes of this regulation: (a... benefits are the tangible and intangible gains to society directly attributable to a water resource project...

  5. 23 CFR 940.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...

  6. 23 CFR 940.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...

  7. 23 CFR 940.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...

  8. Space Station Furnace Facility. Volume 3: Program cost estimate

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.

  9. 7 CFR 1779.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) WATER AND WASTE DISPOSAL PROGRAMS GUARANTEED LOANS § 1779.2 Definitions. The following general... agencies with authority delegated by the Secretary of Agriculture to administer the Water and Waste... collection), solid waste, and storm drainage facilities. WW. An acronym for Water and Waste Disposal. ...

  10. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  11. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  12. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  13. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  14. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  15. 40 CFR 501.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE SLUDGE MANAGEMENT PROGRAM REGULATIONS Purpose, Scope and General Program Requirements § 501.2 Definitions. Administrator.... Class I sludge management facility means any POTW identified under 40 CFR 403.8(a) as being required to...

  16. 40 CFR 501.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE SLUDGE MANAGEMENT PROGRAM REGULATIONS Purpose, Scope and General Program Requirements § 501.2 Definitions. Administrator.... Class I sludge management facility means any POTW identified under 40 CFR 403.8(a) as being required to...

  17. 40 CFR 501.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE SLUDGE MANAGEMENT PROGRAM REGULATIONS Purpose, Scope and General Program Requirements § 501.2 Definitions. Administrator.... Class I sludge management facility means any POTW identified under 40 CFR 403.8(a) as being required to...

  18. 40 CFR 501.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE SLUDGE MANAGEMENT PROGRAM REGULATIONS Purpose, Scope and General Program Requirements § 501.2 Definitions. Administrator.... Class I sludge management facility means any POTW identified under 40 CFR 403.8(a) as being required to...

  19. 40 CFR 501.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE SLUDGE MANAGEMENT PROGRAM REGULATIONS Purpose, Scope and General Program Requirements § 501.2 Definitions. Administrator.... Class I sludge management facility means any POTW identified under 40 CFR 403.8(a) as being required to...

  20. 42 CFR 440.150 - Intermediate care facility (ICF/IIDICF/IID) services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Intermediate care facility (ICF/IIDICF/IID... Definitions § 440.150 Intermediate care facility (ICF/IIDICF/IID) services. (a) “ICF/IIDICF/IID services” means those items and services furnished in an intermediate care facility for Individuals with...

  1. 42 CFR 440.150 - Intermediate care facility (ICF/IIDICF/IID) services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Intermediate care facility (ICF/IIDICF/IID... Definitions § 440.150 Intermediate care facility (ICF/IIDICF/IID) services. (a) “ICF/IIDICF/IID services” means those items and services furnished in an intermediate care facility for Individuals with...

  2. 24 CFR 4.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... process. Assistance within the jurisdiction of the Department to any housing project is subject to Section... nonresidential facilities such as intermediate care facilities, nursing homes and hospitals. It also includes any... services, such as intermediate care facilities, nursing homes, and hospitals. (2) Residential rental...

  3. Conceptual design of an in-space cryogenic fluid management facility, executive summary

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.

  4. 24 CFR 51.301 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Definitions. 51.301 Section 51.301...

  5. 24 CFR 51.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Definitions. 51.301 Section 51.301...

  6. 24 CFR 51.301 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Definitions. 51.301 Section 51.301...

  7. 24 CFR 51.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Definitions. 51.301 Section 51.301...

  8. 24 CFR 51.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Definitions. 51.301 Section 51.301...

  9. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  10. 7 CFR 3430.202 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION... definitions applicable to the program under this subpart include: Integrated project means a project that... or activity. Specialty crop means fruits and vegetables, tree nuts, dried fruits, and horticulture...

  11. 12 CFR 24.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Definitions. 24.2 Section 24.2 Banks and... ENTITIES, COMMUNITY DEVELOPMENT PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS § 24.2 Definitions. For... adequately capitalized in 12 CFR 6.4. (b) Capital and surplus means: (1) A bank's Tier 1 and Tier 2 capital...

  12. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...

  13. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...

  14. 24 CFR 581.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.1 Definitions. Applicant... to enter into an agreement with the Federal government for use of real property for the purposes of... publicly or privately operated shelter designed to provide temporary living accommodations (including...

  15. 24 CFR 581.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.1 Definitions. Applicant... to enter into an agreement with the Federal government for use of real property for the purposes of... publicly or privately operated shelter designed to provide temporary living accommodations (including...

  16. 24 CFR 581.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.1 Definitions. Applicant... to enter into an agreement with the Federal government for use of real property for the purposes of... publicly or privately operated shelter designed to provide temporary living accommodations (including...

  17. 24 CFR 581.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.1 Definitions. Applicant... to enter into an agreement with the Federal government for use of real property for the purposes of... publicly or privately operated shelter designed to provide temporary living accommodations (including...

  18. 29 CFR 501.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation, management, conservation, improvement, or maintenance of such farm and its tools and equipment... operator's own agricultural operation. H-2A Labor Contractor (H-2ALC). Any person who meets the definition...: (1) Substantial continuity of the same business operations; (2) Use of the same facilities; (3...

  19. 33 CFR 154.802 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Vapor Control Systems § 154.802 Definitions. As used in this subpart: Certifying entity means an individual or organization accepted by the Commandant (CG-522) to review plans and calculations for vapor control system designs, and to conduct initial...

  20. 33 CFR 154.802 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Vapor Control Systems § 154.802 Definitions. As used in this subpart: Certifying entity means an individual or organization accepted by the Commandant (CG-522) to review plans and calculations for vapor control system designs, and to conduct initial...

  1. 14 CFR 440.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Definitions. 440.3 Section 440.3 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... space flight participant, for the purposes of this part, is not a customer. Federal range facility means...

  2. 14 CFR 440.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Definitions. 440.3 Section 440.3 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... space flight participant, for the purposes of this part, is not a customer. Federal range facility means...

  3. 18 CFR 292.202 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Definitions. For purposes of this subpart: (a) Biomass means any organic material not derived from fossil.... (c) Cogeneration facility means equipment used to produce electric energy and forms of useful thermal... all forms supplied from external sources; (k) Natural gas means either natural gas unmixed, or any...

  4. 18 CFR 292.202 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Definitions. For purposes of this subpart: (a) Biomass means any organic material not derived from fossil.... (c) Cogeneration facility means equipment used to produce electric energy and forms of useful thermal... all forms supplied from external sources; (k) Natural gas means either natural gas unmixed, or any...

  5. 18 CFR 292.202 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Definitions. For purposes of this subpart: (a) Biomass means any organic material not derived from fossil.... (c) Cogeneration facility means equipment used to produce electric energy and forms of useful thermal... all forms supplied from external sources; (k) Natural gas means either natural gas unmixed, or any...

  6. 18 CFR 292.202 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Definitions. For purposes of this subpart: (a) Biomass means any organic material not derived from fossil.... (c) Cogeneration facility means equipment used to produce electric energy and forms of useful thermal... all forms supplied from external sources; (k) Natural gas means either natural gas unmixed, or any...

  7. 18 CFR 292.202 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Definitions. For purposes of this subpart: (a) Biomass means any organic material not derived from fossil.... (c) Cogeneration facility means equipment used to produce electric energy and forms of useful thermal... all forms supplied from external sources; (k) Natural gas means either natural gas unmixed, or any...

  8. 10 CFR 1706.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.2 Definitions. Advisory... support or improve policy development or decisionmaking by the Board, or management or administration of the Board, or to support or improve the operation of the Board's management systems. Such services may...

  9. 24 CFR 581.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.1 Definitions. Applicant... to enter into an agreement with the Federal government for use of real property for the purposes of... publicly or privately operated shelter designed to provide temporary living accommodations (including...

  10. 6 CFR 15.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... specific learning disabilities. The term physical or mental impairment includes, but is not limited to... DISABILITY IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE DEPARTMENT OF HOMELAND SECURITY § 15.3 Definitions. For... disabilities shall also identify (where possible) the alleged victims of discrimination. (c) Facility means all...

  11. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FOR ESTABLISHMENT, EXPANSION, AND IMPROVEMENT OF VETERANS' CEMETERIES (Eff. until 7-16-10) General Provisions § 39.2 Definitions. For the purpose of this part: (a) Establishment means the process of site... of gravesites and other cemeterial facilities. (c) Improvement means the enhancement of a cemetery...

  12. 40 CFR 60.201 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Process Phosphoric Acid Plants § 60.201 Definitions. As used in this subpart, all terms not defined herein... acid plant means any facility manufacturing phosphoric acid by reacting phosphate rock and acid. (b) Total fluorides means elemental fluorine and all fluoride compounds as measured by reference methods...

  13. 40 CFR 60.201 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Process Phosphoric Acid Plants § 60.201 Definitions. As used in this subpart, all terms not defined herein... acid plant means any facility manufacturing phosphoric acid by reacting phosphate rock and acid. (b) Total fluorides means elemental fluorine and all fluoride compounds as measured by reference methods...

  14. 40 CFR 60.201 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Process Phosphoric Acid Plants § 60.201 Definitions. As used in this subpart, all terms not defined herein... acid plant means any facility manufacturing phosphoric acid by reacting phosphate rock and acid. (b) Total fluorides means elemental fluorine and all fluoride compounds as measured by reference methods...

  15. 40 CFR 60.201 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Process Phosphoric Acid Plants § 60.201 Definitions. As used in this subpart, all terms not defined herein... acid plant means any facility manufacturing phosphoric acid by reacting phosphate rock and acid. (b) Total fluorides means elemental fluorine and all fluoride compounds as measured by reference methods...

  16. 40 CFR 60.201 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Process Phosphoric Acid Plants § 60.201 Definitions. As used in this subpart, all terms not defined herein... acid plant means any facility manufacturing phosphoric acid by reacting phosphate rock and acid. (b) Total fluorides means elemental fluorine and all fluoride compounds as measured by reference methods...

  17. Phased Demolition of an Occupied Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brede, Lawrence M.; Lauterbach, Merl J.; Witt, Brandon W.

    2008-01-15

    The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015more » m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were

  18. Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jerel G.; Kruzic, Michael; Castillo, Carlos

    2013-07-01

    Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing ofmore » facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)« less

  19. Simple projects guidebook : federal-aid procedure for simple projects

    DOT National Transportation Integrated Search

    2002-06-01

    Experience has shown that a simple project generally 1) does not have any right-of-way involvement and 2) has a Programmatic Categorical Exclusion or Categorical Exclusion environmental determination. Page 7 outlines the definition of simple projects...

  20. Hot Corrosion Test Facility at the NASA Lewis Special Projects Laboratory

    NASA Technical Reports Server (NTRS)

    Robinson, Raymond C.; Cuy, Michael D.

    1994-01-01

    The Hot Corrosion Test Facility (HCTF) at the NASA Lewis Special Projects Laboratory (SPL) is a high-velocity, pressurized burner rig currently used to evaluate the environmental durability of advanced ceramic materials such as SiC and Si3N4. The HCTF uses laboratory service air which is preheated, mixed with jet fuel, and ignited to simulate the conditions of a gas turbine engine. Air, fuel, and water systems are computer-controlled to maintain test conditions which include maximum air flows of 250 kg/hr (550 lbm/hr), pressures of 100-600 kPa (1-6 atm), and gas temperatures exceeding 1500 C (2732 F). The HCTF provides a relatively inexpensive, yet sophisticated means for researchers to study the high-temperature oxidation of advanced materials, and the injection of a salt solution provides the added capability of conducting hot corrosion studies.

  1. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  2. 45 CFR 2553.12 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE RETIRED AND SENIOR VOLUNTEER PROGRAM General § 2553.12 Definitions. (a) Act. The Domestic... by the RSVP project sponsor and the volunteer station that identifies project requirements, working relationships and mutual responsibilities. (i) National Senior Service Corps (NSSC). The collective name for the...

  3. 41 CFR 109-28.5001 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5001 Definition... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Definition. 109-28.5001 Section 109-28.5001 Public Contracts and Property Management Federal Property Management Regulations...

  4. Fusion Simulation Program Definition. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cary, John R.

    2012-09-05

    We have completed our contributions to the Fusion Simulation Program Definition Project. Our contributions were in the overall planning with concentration in the definition of the area of Software Integration and Support. We contributed to the planning of multiple meetings, and we contributed to multiple planning documents.

  5. Variation in infection prevention practices in dialysis facilities: results from the national opportunity to improve infection control in ESRD (End-Stage Renal Disease) project.

    PubMed

    Chenoweth, Carol E; Hines, Stephen C; Hall, Kendall K; Saran, Rajiv; Kalbfleisch, John D; Spencer, Teri; Frank, Kelly M; Carlson, Diane; Deane, Jan; Roys, Erik; Scholz, Natalie; Parrotte, Casey; Messana, Joseph M

    2015-07-01

    OBJECTIVE To observe patient care across hemodialysis facilities enrolled in the National Opportunity to Improve Infection Control in ESRD (end-stage renal disease) (NOTICE) project in order to evaluate adherence to evidence-based practices aimed at prevention of infection. SETTING AND PARTICIPANTS Thirty-four hemodialysis facilities were randomly selected from among 772 facilities in 4 end-stage renal disease participating networks. Facility selection was stratified on dialysis organization affiliation, size, socioeconomic status, and urban/rural status. MEASUREMENTS Trained infection control evaluators used an infection control worksheet to observe 73 distinct infection control practices at the hemodialysis facilities, from October 1, 2011, through January 31, 2012. RESULTS There was considerable variation in infection control practices across enrolled facilities. Overall adherence to recommended practices was 68% (range, 45%-92%) across all facilities. Overall adherence to expected hand hygiene practice was 72% (range, 10%-100%). Compliance to hand hygiene before and after procedures was high; however, during procedures hand hygiene compliance averaged 58%. Use of chlorhexidine as the specific agent for exit site care was 19% overall but varied from 0% to 35% by facility type. The 8 checklists varied in the frequency of perfect performance from 0% for meeting every item on the checklist for disinfection practices to 22% on the arteriovenous access practices at initiation. CONCLUSIONS Our findings suggest that there are many areas for improvement in hand hygiene and other infection prevention practices in end-stage renal disease. These NOTICE project findings will help inform the development of a larger quality improvement initiative at dialysis facilities.

  6. Space Station Furnace Facility. Volume 2: Requirements Definition and Conceptual Design Study. Appendix 3: Environment Analysis. Volume 2; Appendix 3

    NASA Technical Reports Server (NTRS)

    1992-01-01

    A Preliminary Safety Analysis (PSA) is being accomplished as part of the Space Station Furnace Facility (SSFF) contract. This analysis is intended to support SSFF activities by analyzing concepts and designs as they mature to develop essential safety requirements for inclusion in the appropriate specifications, and designs, as early as possible. In addition, the analysis identifies significant safety concerns that may warrant specific trade studies or design definition, etc. The analysis activity to date concentrated on hazard and hazard cause identification and requirements development with the goal of developing a baseline set of detailed requirements to support trade study, specifications development, and preliminary design activities. The analysis activity will continue as the design and concepts mature. Section 2 defines what was analyzed, but it is likely that the SSFF definitions will undergo further changes. The safety analysis activity will reflect these changes as they occur. The analysis provides the foundation for later safety activities. The hazards identified will in most cases have Preliminary Design Review (PDR) applicability. The requirements and recommendations developed for each hazard will be tracked to ensure proper and early resolution of safety concerns.

  7. 32 CFR 260.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Definitions. 260.3 Section 260.3 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS..., installation, or facility. A single building or a self-contained group of buildings. A self-contained group of...

  8. 40 CFR 98.308 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... GREENHOUSE GAS REPORTING Electrical Transmission and Distribution Equipment Use § 98.308 Definitions. Except... Air Act and subpart A of this part. Facility, with respect to an electric power system, means the electric power system as defined in this paragraph. An electric power system is comprised of all electric...

  9. 40 CFR 98.308 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... GREENHOUSE GAS REPORTING Electrical Transmission and Distribution Equipment Use § 98.308 Definitions. Except... Air Act and subpart A of this part. Facility, with respect to an electric power system, means the electric power system as defined in this paragraph. An electric power system is comprised of all electric...

  10. 40 CFR 98.308 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... GREENHOUSE GAS REPORTING Electrical Transmission and Distribution Equipment Use § 98.308 Definitions. Except... Air Act and subpart A of this part. Facility, with respect to an electric power system, means the electric power system as defined in this paragraph. An electric power system is comprised of all electric...

  11. 40 CFR 98.308 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... GREENHOUSE GAS REPORTING Electrical Transmission and Distribution Equipment Use § 98.308 Definitions. Except... Air Act and subpart A of this part. Facility, with respect to an electric power system, means the electric power system as defined in this paragraph. An electric power system is comprised of all electric...

  12. 23 CFR 460.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PUBLIC ROAD MILEAGE FOR APPORTIONMENT OF HIGHWAY SAFETY FUNDS § 460.2 Definitions. As used in this part: (a) Public road means any road...-free highway facilities. (c) Open to public travel means that the road section is available, except...

  13. 23 CFR 460.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PUBLIC ROAD MILEAGE FOR APPORTIONMENT OF HIGHWAY SAFETY FUNDS § 460.2 Definitions. As used in this part: (a) Public road means any road...-free highway facilities. (c) Open to public travel means that the road section is available, except...

  14. 23 CFR 460.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PUBLIC ROAD MILEAGE FOR APPORTIONMENT OF HIGHWAY SAFETY FUNDS § 460.2 Definitions. As used in this part: (a) Public road means any road...-free highway facilities. (c) Open to public travel means that the road section is available, except...

  15. 23 CFR 460.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PUBLIC ROAD MILEAGE FOR APPORTIONMENT OF HIGHWAY SAFETY FUNDS § 460.2 Definitions. As used in this part: (a) Public road means any road...-free highway facilities. (c) Open to public travel means that the road section is available, except...

  16. 43 CFR 36.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to its management of the area. The systems shall include related structures and facilities. (1... Lands: Interior Office of the Secretary of the Interior TRANSPORTATION AND UTILITY SYSTEMS IN AND ACROSS, AND ACCESS INTO, CONSERVATION SYSTEM UNITS IN ALASKA § 36.2 Definitions. As used in this part, the...

  17. 48 CFR 925.7001 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7001 Definitions. Costs related to the... company which offers to perform nuclear hot cell services at a facility which is not subject to the laws and regulations of the United States, its agencies, and its political subdivisions. Nuclear hot cell...

  18. 48 CFR 925.7001 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7001 Definitions. Costs related to the... company which offers to perform nuclear hot cell services at a facility which is not subject to the laws and regulations of the United States, its agencies, and its political subdivisions. Nuclear hot cell...

  19. 48 CFR 925.7001 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7001 Definitions. Costs related to the... company which offers to perform nuclear hot cell services at a facility which is not subject to the laws and regulations of the United States, its agencies, and its political subdivisions. Nuclear hot cell...

  20. 48 CFR 925.7001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7001 Definitions. Costs related to the... company which offers to perform nuclear hot cell services at a facility which is not subject to the laws and regulations of the United States, its agencies, and its political subdivisions. Nuclear hot cell...

  1. 40 CFR 60.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... from an affected facility at a grain elevator. (i) Capture system means the equipment such as sheds..., railcar, barge, or ship. (l) Grain handling operations include bucket elevators or legs (excluding legs... PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.301 Definitions. As...

  2. 40 CFR 60.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... from an affected facility at a grain elevator. (i) Capture system means the equipment such as sheds..., railcar, barge, or ship. (l) Grain handling operations include bucket elevators or legs (excluding legs... PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.301 Definitions. As...

  3. 40 CFR 60.301 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... from an affected facility at a grain elevator. (i) Capture system means the equipment such as sheds..., railcar, barge, or ship. (l) Grain handling operations include bucket elevators or legs (excluding legs... PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.301 Definitions. As...

  4. 40 CFR 60.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... from an affected facility at a grain elevator. (i) Capture system means the equipment such as sheds..., railcar, barge, or ship. (l) Grain handling operations include bucket elevators or legs (excluding legs... PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.301 Definitions. As...

  5. 40 CFR 60.301 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... from an affected facility at a grain elevator. (i) Capture system means the equipment such as sheds..., railcar, barge, or ship. (l) Grain handling operations include bucket elevators or legs (excluding legs... PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.301 Definitions. As...

  6. 21 CFR 207.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... chapter, and any distribution of an animal drug or animal feed bearing or containing an animal drug for..., and animal facilities used for the production or control testing of licensed biologicals, and... definition of drugs in section 201(g) of the act. The term includes manipulation, sampling, testing, or...

  7. 21 CFR 207.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... chapter, and any distribution of an animal drug or animal feed bearing or containing an animal drug for..., and animal facilities used for the production or control testing of licensed biologicals, and... definition of drugs in section 201(g) of the act. The term includes manipulation, sampling, testing, or...

  8. 21 CFR 207.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... chapter, and any distribution of an animal drug or animal feed bearing or containing an animal drug for..., and animal facilities used for the production or control testing of licensed biologicals, and... definition of drugs in section 201(g) of the act. The term includes manipulation, sampling, testing, or...

  9. 21 CFR 207.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... chapter, and any distribution of an animal drug or animal feed bearing or containing an animal drug for..., and animal facilities used for the production or control testing of licensed biologicals, and... definition of drugs in section 201(g) of the act. The term includes manipulation, sampling, testing, or...

  10. 21 CFR 207.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... chapter, and any distribution of an animal drug or animal feed bearing or containing an animal drug for..., and animal facilities used for the production or control testing of licensed biologicals, and... definition of drugs in section 201(g) of the act. The term includes manipulation, sampling, testing, or...

  11. 48 CFR 925.7001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7001 Definitions. Costs related to the... company which offers to perform nuclear hot cell services at a facility which is not subject to the laws and regulations of the United States, its agencies, and its political subdivisions. Nuclear hot cell...

  12. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUECK, K.J.

    2004-10-18

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less

  13. 40 CFR 63.5779 - What definitions apply to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... manufacturing facility means a facility that manufactures the hulls or decks of boats from fiberglass or... resin means any resin used to manufacture parts for sale. Production resins do not include tooling... National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing Definitions § 63.5779 What...

  14. 36 CFR 1281.3 - What definitions apply to this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.3 What definitions apply to this part? The... materials in the care and custody of the Presidential libraries, and includes the salaries and expenses of NARA personnel performing those functions. Endowment library. This term means a Presidential library...

  15. Facility Volume and Survival in Nasopharyngeal Carcinoma.

    PubMed

    Yoshida, Emi J; Luu, Michael; David, John M; Kim, Sungjin; Mita, Alain; Scher, Kevin; Shiao, Stephen L; Tighiouart, Mourad; Lee, Nancy Y; Ho, Allen S; Zumsteg, Zachary S

    2018-02-01

    Definitive treatment of nasopharyngeal carcinoma (NPC) is challenging owing to its rarity, complicated regional anatomy, and the intensity of therapy. In contrast to other head and neck cancers, the effect of facility volume has not been well described for NPC. The National Cancer Database was queried for patients with stage II-IVB NPC diagnosed from 2004 to 2014 and treated with definitive radiation. Patients with incomplete staging, unknown receipt or timing of treatment, unknown follow-up duration, incomplete socioeconomic information, or treatment outside the reporting facility were excluded. High-volume facilities (HVFs) were defined as the top 5% of facilities according to the annual facility volume. The present analysis included 3941 NPC patients treated at 804 facilities with a median follow-up duration of 59.4 months, including 1025 patients (26.0%) treated at HVFs. Treatment at HVFs was associated with significantly improved overall survival (OS) on multivariable analysis (hazard ratio 0.79, 95% confidence interval 0.69-0.90; P=.001). In propensity score-matched cohorts, 5-year OS was 69.1% versus 63.3% at HVFs versus lower volume facilities (LVFs), respectively (P=.003). Similar results were seen when facility volume was analyzed as a continuous variable. The effect of facility volume on survival varied by academic status (P=.002 for interaction). At academic centers, the propensity score-matched cohorts had 5-year OS of 71.4% compared with 62.4% (P<.001) at HVFs and LVFs, respectively. In contrast, the 5-year OS was 63.5% versus 67.9% (P=.68) in propensity score-matched patients at nonacademic HVFs and LVFs. Treatment at HVFs was associated with improved OS for patients with NPC, with the effect exclusively seen at academic centers. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. 23 CFR 140.805 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Audit Expense § 140.805 Definitions. (a) Project related audits. Audits which directly benefit Federal-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits of third party contract costs, and other audits providing assurance that a recipient has complied...

  17. 10 CFR 609.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...

  18. 10 CFR 609.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...

  19. 10 CFR 609.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...

  20. 36 CFR 218.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Authorized by the Healthy Forests Restoration Act of 2003 § 218.2 Definitions. Address: An individual's or organization's current physical mailing address. An e-mail address is not sufficient. Authorized hazardous fuel reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of...

  1. 36 CFR 218.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Authorized by the Healthy Forests Restoration Act of 2003 § 218.2 Definitions. Address: An individual's or organization's current physical mailing address. An e-mail address is not sufficient. Authorized hazardous fuel reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of...

  2. Lunar base launch and landing facilities conceptual design

    NASA Technical Reports Server (NTRS)

    Phillips, Paul G.; Simonds, Charles H.; Stump, William R.

    1992-01-01

    The purpose of this study was to perform a first look at the requirements for launch and landing facilities for early lunar bases and to prepared conceptual designs for some of these facilities. The emphasis of the study is on the facilities needed from the first manned landing until permanent occupancy, the Phase 2 lunar base. Factors including surface characteristics, navigation system, engine blast effects, and expected surface operations are used to develop landing pad designs, and definitions fo various other elements of the launch and landing facilities. Finally, the dependence of the use of these elements and the evolution of the facilities are established.

  3. The HEALTHGRAIN definition of ‘whole grain’

    PubMed Central

    van der Kamp, Jan Willem; Poutanen, Kaisa; Seal, Chris J.; Richardson, David P.

    2014-01-01

    Most cereal products, like white bread, pasta, and biscuits, are based on flour after removal of bran and germ, the two parts of grain kernels containing most of the dietary fibre and other bioactive components. In the past decade, consumers have been rediscovering whole grain-based products and the number of wholegrain products has increased rapidly. In most countries in Europe and worldwide, however, no legally endorsed definition of wholegrain flour and products exists. Current definitions are often incomplete, lacking descriptions of the included grains and the permitted flour manufacturing processes. The consortium of the HEALTHGRAIN EU project (FP6-514008, 2005–2010) identified the need for developing a definition of whole grain with the following scope: 1) more comprehensive than current definitions in most EU countries; 2) one definition for Europe – when possible equal to definitions outside Europe; 3) reflecting current industrial practices for production of flours and consumer products; 4) useful in the context of nutritional guidelines and for labelling purposes. The definition was developed in a range of discussion meetings and consultations and was launched in 2010 at the end of the HEALTHGRAIN project. The grains included are specified: a wide range of cereal grains from the Poaceae family, and the pseudo-cereals amaranth, buckwheat, quinoa, and wild rice. The definition also describes manufacturing processes allowed for producing wholegrain flours. This paper compares the HEALTHGRAIN definition with previous definitions, provides more comprehensive explanations than in the definition itself regarding the inclusion of specific grains, and sets out the permitted flour manufacturing processes. PMID:24505218

  4. Microgravity

    NASA Image and Video Library

    1998-09-30

    The Electrostatic Levitator (ESL) Facility established at Marshall Space Flight Center (MSFC) supports NASA's Microgravity Materials Science Research Program. NASA materials science investigations include ground-based, flight definition and flight projects. Flight definition projects, with demanding science concept review schedules, receive highest priority for scheduling experiment time in the Electrostatic Levitator (ESL) Facility.

  5. 9 CFR 98.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos from Regions Free of Rinderpest and Foot-and-Mouth Disease; and Embryos of Horses and Asses § 98.2 Definitions. The following terms, when used in this... supervision of such government. Approved embryo transfer unit. A facility approved or licensed by the national...

  6. 9 CFR 98.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos from Regions Free of Rinderpest and Foot-and-Mouth Disease; and Embryos of Horses and Asses § 98.2 Definitions. The following terms, when used in this... supervision of such government. Approved embryo transfer unit. A facility approved or licensed by the national...

  7. 9 CFR 98.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos from Regions Free of Rinderpest and Foot-and-Mouth Disease; and Embryos of Horses and Asses § 98.2 Definitions. The following terms, when used in this... supervision of such government. Approved embryo transfer unit. A facility approved or licensed by the national...

  8. 24 CFR 594.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Definitions. 594.3 Section 594.3 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES JOHN HEINZ...

  9. 10 CFR 1704.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Definitions. 1704.2 Section 1704.2 Energy DEFENSE NUCLEAR... in said positions, pursuant to 42 U.S.C. 2286(c). (b) Defense Nuclear Facilities Safety Board means the Board established under the National Defense Authorization Act, Fiscal Year 1989. (c) General...

  10. 10 CFR 1704.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Definitions. 1704.2 Section 1704.2 Energy DEFENSE NUCLEAR... in said positions, pursuant to 42 U.S.C. 2286(c). (b) Defense Nuclear Facilities Safety Board means the Board established under the National Defense Authorization Act, Fiscal Year 1989. (c) General...

  11. 10 CFR 1704.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 1704.2 Section 1704.2 Energy DEFENSE NUCLEAR... in said positions, pursuant to 42 U.S.C. 2286(c). (b) Defense Nuclear Facilities Safety Board means the Board established under the National Defense Authorization Act, Fiscal Year 1989. (c) General...

  12. 10 CFR 1704.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 1704.2 Section 1704.2 Energy DEFENSE NUCLEAR... in said positions, pursuant to 42 U.S.C. 2286(c). (b) Defense Nuclear Facilities Safety Board means the Board established under the National Defense Authorization Act, Fiscal Year 1989. (c) General...

  13. 10 CFR 1704.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 1704.2 Section 1704.2 Energy DEFENSE NUCLEAR... in said positions, pursuant to 42 U.S.C. 2286(c). (b) Defense Nuclear Facilities Safety Board means the Board established under the National Defense Authorization Act, Fiscal Year 1989. (c) General...

  14. 40 CFR 256.06 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 256.06 Definitions. Terms not defined below have the meanings assigned them by section 1004 of the Act. The Act means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act... resource recovery system or component thereof, any system, program or facility for resource conservation...

  15. 40 CFR 256.06 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 256.06 Definitions. Terms not defined below have the meanings assigned them by section 1004 of the Act. The Act means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act... resource recovery system or component thereof, any system, program or facility for resource conservation...

  16. 40 CFR 256.06 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 256.06 Definitions. Terms not defined below have the meanings assigned them by section 1004 of the Act. The Act means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act... resource recovery system or component thereof, any system, program or facility for resource conservation...

  17. 40 CFR 256.06 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 256.06 Definitions. Terms not defined below have the meanings assigned them by section 1004 of the Act. The Act means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act... resource recovery system or component thereof, any system, program or facility for resource conservation...

  18. 40 CFR 256.06 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 256.06 Definitions. Terms not defined below have the meanings assigned them by section 1004 of the Act. The Act means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act... resource recovery system or component thereof, any system, program or facility for resource conservation...

  19. 42 CFR 495.4 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technology has the same definition as this term is defined at 45 CFR 170.102. Critical access hospital (CAH) means a facility that has been certified as a critical access hospital under section 1820(e) of the Act... AND CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM General...

  20. 42 CFR 495.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technology has the same definition as this term is defined at 45 CFR 170.102. Critical access hospital (CAH) means a facility that has been certified as a critical access hospital under section 1820(e) of the Act... AND CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM General...

  1. 25 CFR 11.900 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Children's Court § 11.900 Definitions. For purposes of sections pertaining to the children's court: (a... one year or more with no indication of the parents' willingness to assume a parental role. (b) Adult... physically restrictive facility. (h) Guardian means a person other than the minor's parent who is by law...

  2. 42 CFR 456.601 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Definitions. 456.601 Section 456.601 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Inspections of Care in Intermediate Care Facilities and Institutions for Mental Diseases § 456.601...

  3. 42 CFR 456.601 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Definitions. 456.601 Section 456.601 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Inspections of Care in Intermediate Care Facilities and Institutions for Mental Diseases § 456.601...

  4. 7 CFR 240.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... children and for runaway children; long-term care facilities for chronically ill children; and juvenile... CHILD NUTRITION PROGRAMS CASH IN LIEU OF DONATED FOODS § 240.2 Definitions. For the purpose of this part the term: Act means the National School Lunch Act, as amended. Child Care Food Program means the...

  5. 7 CFR 240.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... children and for runaway children; long-term care facilities for chronically ill children; and juvenile... CHILD NUTRITION PROGRAMS CASH IN LIEU OF DONATED FOODS § 240.2 Definitions. For the purpose of this part the term: Act means the National School Lunch Act, as amended. Child Care Food Program means the...

  6. 7 CFR 240.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... children and for runaway children; long-term care facilities for chronically ill children; and juvenile... CHILD NUTRITION PROGRAMS CASH IN LIEU OF DONATED FOODS § 240.2 Definitions. For the purpose of this part the term: Act means the National School Lunch Act, as amended. Child Care Food Program means the...

  7. 40 CFR 98.468 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... GREENHOUSE GAS REPORTING Industrial Waste Landfills § 98.468 Definitions. Except as provided below, all terms... and demolition (C&D) waste landfill means a solid waste disposal facility subject to the requirements of subparts A or B of part 257 of this chapter that receives construction and demolition waste and...

  8. Exploring Stakeholder Definitions within the Aerospace Industry: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Hebert, Jonathan R.

    A best practice in the discipline of project management is to identify all key project stakeholders prior to the execution of a project. When stakeholders are properly identified, they can be consulted to provide expert advice on project activities so that the project manager can ensure the project stays within the budget and schedule constraints. The problem addressed by this study is that managers fail to properly identify key project stakeholders when using stakeholder theory because there are multiple conflicting definitions for the term stakeholder. Poor stakeholder identification has been linked to multiple negative project outcomes such as budget and schedules overruns, and this problem is heightened in certain industries such as aerospace. The purpose of this qualitative study was to explore project managers' and project stakeholders' perceptions of how they define and use the term stakeholder within the aerospace industry. This qualitative exploratory single-case study had two embedded units of analysis: project managers and project stakeholders. Six aerospace project managers and five aerospace project stakeholders were purposively selected for this study. Data were collected through individual semi-structured interviews with both project managers and project stakeholders. All data were analyzed using Yin's (2011) five-phased cycle approach for qualitative research. The results indicated that the aerospace project managers and project stakeholder define the term stakeholder as "those who do the work of a company." The participants build upon this well-known concept by adding that, "a company should list specific job titles" that correspond to their company specific-stakeholder definition. Results also indicated that the definition of the term stakeholder is used when management is assigning human resources to a project to mitigate or control project risk. Results showed that project managers tended to include the customer in their stakeholder definitions

  9. MINIMUM AREAS FOR ELEMENTARY SCHOOL BUILDING FACILITIES.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Public Instruction, Harrisburg.

    MINIMUM AREA SPACE REQUIREMENTS IN SQUARE FOOTAGE FOR ELEMENTARY SCHOOL BUILDING FACILITIES ARE PRESENTED, INCLUDING FACILITIES FOR INSTRUCTIONAL USE, GENERAL USE, AND SERVICE USE. LIBRARY, CAFETERIA, KITCHEN, STORAGE, AND MULTIPURPOSE ROOMS SHOULD BE SIZED FOR THE PROJECTED ENROLLMENT OF THE BUILDING IN ACCORDANCE WITH THE PROJECTION UNDER THE…

  10. 14 CFR § 1250.102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Definitions. § 1250.102 Section § 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY... the provision of facilities includes the construction, expansion, renovation, remodeling, alteration...

  11. 33 CFR 154.105 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK General § 154.105 Definitions. As used in this part... equipment in the marine transfer area are completely free of oil or hazardous materials, where these..., used or capable of being used to transfer oil or hazardous materials to or from a vessel or public...

  12. 33 CFR 154.105 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK General § 154.105 Definitions. As used in this part... equipment in the marine transfer area are completely free of oil or hazardous materials, where these..., used or capable of being used to transfer oil or hazardous materials to or from a vessel or public...

  13. 30 CFR 250.1001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Way § 250.1001 Definitions. Terms used in this subpart shall have the meanings given below: DOI... connecting production facilities on the OCS; (4) Transporter-operated pipelines that DOI and DOT have agreed are to be regulated as DOI pipelines; and (5) All OCS pipelines not subject to regulation under 49 CFR...

  14. 18 CFR 12.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... work; (iv) Unusual concrete deterioration or cracking, including development of new cracks or the... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.3 Definitions. (a) General rule. For purposes of this part, terms defined in section 3 of the...

  15. 24 CFR 886.102 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... for Projects With HUD-Insured and HUD-Held Mortgages § 886.102 Definitions. The terms Fair Market Rent...-held purchase money mortgage; or a project for the elderly financed under section 202 of the Housing...

  16. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  17. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  18. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  19. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  20. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  1. Computational and Experimental Characterization of the Mach 6 Facility Nozzle Flow for the Enhanced Injection and Mixing Project at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Drozda, Tomasz G.; Cabell, Karen F.; Passe, Bradley J.; Baurle, Robert A.

    2017-01-01

    Computational fluid dynamics analyses and experimental data are presented for the Mach 6 facility nozzle used in the Arc-Heated Scramjet Test Facility for the Enhanced Injection and Mixing Project (EIMP). This project, conducted at the NASA Langley Research Center, aims to investigate supersonic combustion ramjet (scramjet) fuel injection and mixing physics relevant to flight Mach numbers greater than 8. The EIMP experiments use a two-dimensional Mach 6 facility nozzle to provide the high-speed air simulating the combustor entrance flow of a scramjet engine. Of interest are the physical extent and the thermodynamic properties of the core flow at the nozzle exit plane. The detailed characterization of this flow is obtained from three-dimensional, viscous, Reynolds-averaged simulations. Thermodynamic nonequilibrium effects are also investigated. The simulations are compared with the available experimental data, which includes wall static pressures as well as in-stream static pressure, pitot pressure and total temperature obtained via in-stream probes positioned just downstream of the nozzle exit plane.

  2. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site

  3. Health worker perspectives on the possible use of intramuscular artesunate for the treatment of severe malaria at lower-level health facilities in settings with poor access to referral facilities in Nigeria: a qualitative study.

    PubMed

    Adesoro, Olatunde; Shumba, Constance; Kpamor, John; Achan, Jane; Kivumbi, Harriet; Dada, John; Maxwell, Kolawole; Tibenderana, James; Marasciulo, Madeline; Hamade, Prudence; Oresanya, Olusola; Nankabirwa, Joanita; Baba, Ebenezer

    2016-10-12

    Innovative strategies are needed to reduce malaria mortality in high burden countries like Nigeria. Given that one of the important reasons for this high malaria mortality is delay in receiving effective treatment, improved access to such treatment is critical. Intramuscular artesunate could be used at lower-level facilities given its proven efficacy, ease of use and excellent safety profile. The objective of this study was therefore to explore health workers' perspectives on the possible use of intramuscular artesunate as definitive treatment for severe malaria at lower-level facilities, especially when access to referral facilities is challenging. The study was to provide insight as a formative step into the conduct of future experimental studies to ascertain the feasibility of the use of intramuscular artesunate for definitive treatment of severe malaria in lower level facilities where access to referral care is limited. This qualitative study was done across three southern States in Nigeria (Oyo, Cross River and Enugu). Key informant interviews were conducted over a period of three months between October and December 2014 among 90 purposively selected health workers with different roles in malaria case management from primary care to policy level. A thematic content analysis was used to analyse data. Overall, most of health workers and other key informant groups thought that the use of intramuscular artesunate for definitive treatment of severe malaria at lower-level facilities was possible. They however reported human resource and infrastructure constraints as factors affecting the feasibility of intramuscular artesunate use as definitive treatment for severe malaria in lower-level facilities.. Specifically identified barriers included limited numbers of skilled health workers available to manage potential complications of severe malaria and poorly equipped facilities for supportive treatment. Intramuscular artesunate was considered easy to administer and the

  4. Goddard Space Flight Center Spacecraft Magnetic Test Facility Restoration Project

    NASA Technical Reports Server (NTRS)

    Vernier, Robert; Bonalksy, Todd; Slavin, James

    2004-01-01

    The Goddard Space Flight Center Spacecraft Magnetic Test Facility (SMTF) was constructed in the 1960's for the purpose of simulating geomagnetic and interplanetary magnetic field environments. The facility includes a three axis Braunbek coil system consisting of 12 loops, 4 loops on each of the three orthogonal axes; a remote Earth field sensing magnetometer and servo controller; and a remote power control and instrumentation building. The inner coils of the Braunbek system are 42-foot in diameter with a 10-foot by 10-foot opening through the outer coils to accommodate spacecraft access into the test volume. The physical size and precision of the facility are matched by only two other such facilities in the world. The facility was used extensively from the late 1960's until the early 1990's when the requirement for spacecraft level testing diminished. New NASA missions planned under the Living with a Star, Solar Terrestrial Probes, Explorer, and New Millennium Programs include precision, high-resolution magnetometers to obtain magnetic field data that is critical to fulfilling their scientific mission. It is highly likely that future Lunar and Martian exploration missions will also use precision magnetometers to conduct geophysical magnetic surveys. To ensure the success of these missions, ground-testing using a magnetic test facility such as the GSFC SMTF will be required. This paper describes the history of the facility, the future mission requirements that have renewed the need for spacecraft level magnetic testing, and the plans for restoring the facility to be capable of performing to its original design specifications.

  5. Goddard Space Flight Center Spacecraft Magnetic Test Facility Restoration Project

    NASA Technical Reports Server (NTRS)

    Vernier, Robert; Bonalosky, Todd; Slavin, James

    2004-01-01

    The Goddard Space Flight Center Spacecraft Magnetic Test Facility (SMTF) was constructed in the 1960's for the purpose of simulating geomagnetic and interplanetary magnetic field environments. The facility includes a three axis Braunbek coil system consisting of 12 loops, 4 loops on each of the three orthogonal axes; a remote Earth field sensing magnetometer and servo controller; and a remote power control and instrumentation building. The inner coils of the Braunbek system are 42-foot in diameter with a 10-foot by 10-foot opening through the outer coils to accommodate spacecraft access into the test volume. The physical size and precision of the facility are matched by only two other such facilities in the world. The facility was used extensively from the late 1960's until the early 1990's when the requirement for spacecraft level testing diminished. New NASA missions planned under the Living with a Star, Solar Terrestrial Probes, Explorer, and New Millennium Programs include precision, high-resolution magnetometers to obtain magnetic field data that is critical to fulfilling their scientific mission. It is highly likely that future Lunar and Martian exploration missions will also use precision magnetometers to conduct geophysical magnetic surveys. To ensure the success of these missions, ground testing using a magnetic test facility such as the GSFC SMTF will be required. This paper describes the history of the facility, the future mission requirements that have renewed the need for spacecraft level magnetic testing, and the plans for restoring the facility to be capable of performing to its original design specifications.

  6. 42 CFR 51a.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...

  7. 42 CFR 51a.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...

  8. 42 CFR 51a.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...

  9. 42 CFR 51a.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...

  10. 42 CFR 440.150 - Intermediate care facility (ICF/IID) services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Intermediate care facility (ICF/IID) services. 440.150 Section 440.150 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS SERVICES: GENERAL PROVISIONS Definitions § 440.150 Intermediate care facility (ICF/IID)...

  11. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Definitions. 100.3 Section 100.3 Energy NUCLEAR REGULATORY... means a combined construction permit and operating license with conditions for a nuclear power facility..., issued pursuant to subpart A of part 52 of this chapter, for a site or sites for one or more nuclear...

  12. 38 CFR 17.62 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Residential Care § 17.62 Definitions. For the purpose of §§ 17.61 through 17.72: (a) The term community... care, of the daily living activities of referred veterans in an approved home in the community by the... hearing means the in person testimony of representatives of a community residential care facility and of...

  13. The Science and Applications Tethered Platform (SATP) project

    NASA Technical Reports Server (NTRS)

    Merlina, P.

    1986-01-01

    The capabilities of tether systems in orbit are going to be demonstrated by the first planned flights of the Tethered Satellite System (TSS). These test flights will investigate the properties of tether systems as low altitude atmospheric research facilities and as electric power generators. Studies are being conducted with the purpose of testing a variety of concepts and approaches. A comparative analysis of results will allow the choosing of the most promising ideas for further development. The broad range of applications presently under study include applications in electrodynamics, transportation, microgravity in addition to basic research. The SATP project definition study is now about midway through its first phase. The analyses conducted have led to an appraisal of users interest in the project and to a deeper understanding of the problems associated with large, long-lived tether systems in space. In addition, two specialized platform designs, devoted to microgravity and precise pointing applications, are being studied because of their potential usefulness and the promise of technical feasibility.

  14. 36 CFR § 1281.3 - What definitions apply to this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.3 What definitions apply to this part? The... materials in the care and custody of the Presidential libraries, and includes the salaries and expenses of NARA personnel performing those functions. Endowment library. This term means a Presidential library...

  15. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  16. Molten Salt: Concept Definition and Capital Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoddard, Larry; Andrew, Daniel; Adams, Shannon

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO hasmore » a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO 2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO 2 cycle generating

  17. Health facilities humanisation: design guidelines supported by statistical evidence.

    PubMed

    Bosia, Daniela; Marino, Donatella; Peretti, Gabriella

    2016-01-01

    Healthcare building humanisation is currently a widely debated issue and the development of patient centered and evidence based design is growing worldwide. Many international health organizations and researchers understand the importance of Patient Centred Design and leading architects incorporate it into the design process. In Italy this design approach is still at an early stage. The article refers to research commissioned by the Italian Health Ministry and carried out by R. Del Nord (Università degli Studi di Firenze) and G. Peretti (Politecnico di Torino) with their collaborators. The scope of the research was the definition of design guidelines for healthcare facilities humanisation. The methodology framework adopted is the well established need and performance approach in architectural design. The article deals with the results of statistical investigations for the definition and ranking of users' needs and the consistent expression of their requirements. The investigations were carried out with the cooperation of psychologists of the Università degli Studi di Torino and researchers of the Università degli Studi di Cagliari. The proposed evaluation system allows ranking of health facilities according to the level of humanisation achieved. The statistical investigation evidence collected allowed the definition of humanisation design guidelines for health-care facilities and for the assessment of their specific level of humanisation.

  18. High-Definition Medicine.

    PubMed

    Torkamani, Ali; Andersen, Kristian G; Steinhubl, Steven R; Topol, Eric J

    2017-08-24

    The foundation for a new era of data-driven medicine has been set by recent technological advances that enable the assessment and management of human health at an unprecedented level of resolution-what we refer to as high-definition medicine. Our ability to assess human health in high definition is enabled, in part, by advances in DNA sequencing, physiological and environmental monitoring, advanced imaging, and behavioral tracking. Our ability to understand and act upon these observations at equally high precision is driven by advances in genome editing, cellular reprogramming, tissue engineering, and information technologies, especially artificial intelligence. In this review, we will examine the core disciplines that enable high-definition medicine and project how these technologies will alter the future of medicine. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. 40 CFR 98.330 - Definition of the source category.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Zinc Production § 98.330 Definition of the source category. The zinc production source category consists of zinc smelters and secondary zinc recycling facilities. ...

  20. 40 CFR 98.330 - Definition of the source category.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Zinc Production § 98.330 Definition of the source category. The zinc production source category consists of zinc smelters and secondary zinc recycling facilities. ...

  1. 42 CFR 440.150 - Intermediate care facility (ICF/MR) services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Intermediate care facility (ICF/MR) services. 440.150 Section 440.150 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS SERVICES: GENERAL PROVISIONS Definitions § 440.150 Intermediate care facility (ICF/MR) service...

  2. A Bridge over Troubled Water: Facility Needs for Inclusive Classrooms.

    ERIC Educational Resources Information Center

    Pierce, Judy; And Others

    1993-01-01

    Focuses on ways to meet the facility needs of students with disabilities in inclusive classrooms. Provides a definition of inclusion; discusses some processes to design school environments that support a side range of student needs; and presents a process that will enable facility planning teams to move all students from self-contained classrooms…

  3. 20 CFR 655.302 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Nurses § 655.302 Definitions. For the purposes of subparts D and E of this part: Accepted for filing.... Bona fide medical emergency means a situation in which the services of one or more H-1A contract nurses are necessary at a worksite facility (which itself does not employ an H-1A nurse) to prevent death or...

  4. The Low Temperature Microgravity Physics Facility Project

    NASA Technical Reports Server (NTRS)

    Chui, T.; Holmes, W.; Lai, A.; Croonquist, A.; Eraker, J.; Abbott, R.; Mills, G.; Mohl, J.; Craig, J.; Balachandra, B.; hide

    2000-01-01

    We describe the design and development of the Low Temperature Microgravity Physics Facility, which is intended to provide a unique environment of low temperature and microgravity for the scientists to perform breakthrough investigations on board the International Space Station.

  5. 34 CFR 379.5 - What definitions apply?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...

  6. 34 CFR 379.5 - What definitions apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...

  7. 34 CFR 379.5 - What definitions apply?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...

  8. 34 CFR 379.5 - What definitions apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...

  9. 49 CFR 268.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... environmental impact statement which is required pursuant to §§ 268.3. Eligible project costs means the costs of preconstruction planning activities and the capital cost of the fixed guideway infrastructure of a Maglev project... storage, repair, and maintenance facilities, but eligible project costs do not include the cost of...

  10. 42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...

  11. 42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...

  12. 42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...

  13. 42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...

  14. 42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...

  15. Zero Gravity Research Facility User's Guide

    NASA Technical Reports Server (NTRS)

    Thompson, Dennis M.

    1999-01-01

    The Zero Gravity Research Facility (ZGF) is operated by the Space Experiments Division of the NASA John H. Glenn Research Center (GRC) for investigators sponsored by the Microgravity Science and Applications Division of NASA Headquarters. This unique facility has been utilized by scientists and engineers for reduced gravity experimentation since 1966. The ZGF has provided fundamental scientific information, has been used as an important test facility in the space flight hardware design, development, and test process, and has also been a valuable source of data in the flight experiment definition process. The purpose of this document is to provide information and guidance to prospective researchers regarding the design, buildup, and testing of microgravity experiments.

  16. Statewide Publc Facilities section, Alaska Department of Transportation &

    Science.gov Websites

    &PF> Statewide Public Facilities Welcome to the Statewide Public Facilities Jack Hernandez Sport Fish Hatchery Anchorage Sport Fish Hatchery Statewide Public Facilities provides project management

  17. Constellation Training Facility Support

    NASA Technical Reports Server (NTRS)

    Flores, Jose M.

    2008-01-01

    The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The Cx

  18. 24 CFR 969.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....103 Definitions. (a) “ACC expiration date” means the last day of the term during which a particular public housing project is subject to all or any of the provisions of the ACC. The ACC term for a... Contribution Date for the project, as determined under the ACC (e.g., if the last debt service Annual...

  19. 24 CFR 969.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....103 Definitions. (a) “ACC expiration date” means the last day of the term during which a particular public housing project is subject to all or any of the provisions of the ACC. The ACC term for a... Contribution Date for the project, as determined under the ACC (e.g., if the last debt service Annual...

  20. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  1. Concentrating Solar Power Projects - Parabolic Trough Projects |

    Science.gov Websites

    Project Godawari Solar Project Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Kuraymat (ISCC Kuraymat) Kathu Solar Park KaXu Solar One KVK Energy Solar Project La Africana La Dehesa La Power Facility Nevada Solar One (NSO) NOOR I NOOR II Olivenza 1 Orellana Palma del Río I Palma del Río

  2. Reducing hospital-acquired heel ulcer rates in an acute care facility: an evaluation of a nurse-driven performance improvement project.

    PubMed

    McElhinny, Mary Louise; Hooper, Christine

    2008-01-01

    A nurse-driven performance improvement project designed to reduce the incidence of hospital-acquired ulcers of the heel in an acute care setting was evaluated. This was a descriptive evaluative study using secondary data analysis. Data were collected in 2004, prior to implementation of the prevention project and compared to results obtained in 2006, after the project was implemented. Data were collected in a 172-bed, not-for-profit inpatient acute care facility in North Central California. All medical-surgical inpatients aged 18 years and older were included in the samples. Data were collected on 113 inpatients prior to implementation of the project in 2004. Data were also collected on a sample of 124 inpatients in 2006. The prevalence and incidence of heel pressure ulcers were obtained through skin surveys prior to implementation of the prevention program and following its implementation. Results from 2004 were compared to data collected in 2006 after introduction of the Braden Scale for Predicting Pressure Sore Risk. Heel pressure ulcers were staged using the National Pressure Ulcer Advisory Panel (NPUAP) staging system and recommendations provided by the Agency for Health Care Quality Research (AHRQ) clinical practice guidelines. The incidence of hospital-acquired heel pressure ulcers in 2004 was 13.5% (4 of 37 patients). After implementation of the program in 2006, the incidence of hospital-acquired heel pressure ulcers was 13.8% (5 of 36 patients). The intervention did not appear to receive adequate staff nurse support needed to make the project successful. Factors that influenced the lack of support may have included: (1) educational method used, (2) lack of organization approved, evidenced-based standardized protocols for prevention and treatment of heel ulcers, and (3) failure of facility management to convey the importance as well as their support for the project.

  3. 48 CFR 235.015-70 - Special use allowances for research facilities acquired by educational institutions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... research facilities acquired by educational institutions. 235.015-70 Section 235.015-70 Federal Acquisition... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.015-70 Special use allowances for research facilities acquired by educational institutions. (a) Definitions. As used in this subsection— (1) Research facility...

  4. 40 CFR 412.21 - Special definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.21 Special definitions. For the purposes of this subpart: (a) Dry lot means a facility for growing ducks in confinement... for raising ducks which is open to the environment, has a small number of sheltered areas, and with...

  5. 40 CFR 412.21 - Special definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.21 Special definitions. For the purposes of this subpart: (a) Dry lot means a facility for growing ducks in confinement... for raising ducks which is open to the environment, has a small number of sheltered areas, and with...

  6. 40 CFR 412.21 - Special definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.21 Special definitions. For the purposes of this subpart: (a) Dry lot means a facility for growing ducks in confinement... for raising ducks which is open to the environment, has a small number of sheltered areas, and with...

  7. 40 CFR 412.21 - Special definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.21 Special definitions. For the purposes of this subpart: (a) Dry lot means a facility for growing ducks in confinement... for raising ducks which is open to the environment, has a small number of sheltered areas, and with...

  8. 40 CFR 412.21 - Special definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.21 Special definitions. For the purposes of this subpart: (a) Dry lot means a facility for growing ducks in confinement... for raising ducks which is open to the environment, has a small number of sheltered areas, and with...

  9. Spent nuclear fuel project cold vacuum drying facility operations manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IRWIN, J.J.

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less

  10. 10 CFR 770.4 - What definitions are used in this part?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What definitions are used in this part? 770.4 Section 770.4 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC.... Defense Nuclear Facility means “Department of Energy defense nuclear facility” within the meaning of...

  11. 10 CFR 770.4 - What definitions are used in this part?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What definitions are used in this part? 770.4 Section 770.4 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC.... Defense Nuclear Facility means “Department of Energy defense nuclear facility” within the meaning of...

  12. Requirements management for Gemini Observatory: a small organization with big development projects

    NASA Astrophysics Data System (ADS)

    Close, Madeline; Serio, Andrew; Cordova, Martin; Hardie, Kayla

    2016-08-01

    Gemini Observatory is an astronomical observatory operating two premier 8m-class telescopes, one in each hemisphere. As an operational facility, a majority of Gemini's resources are spent on operations however the observatory undertakes major development projects as well. Current projects include new facility science instruments, an operational paradigm shift to full remote operations, and new operations tools for planning, configuration and change control. Three years ago, Gemini determined that a specialized requirements management tool was needed. Over the next year, the Gemini Systems Engineering Group investigated several tools, selected one for a trial period and configured it for use. Configuration activities including definition of systems engineering processes, development of a requirements framework, and assignment of project roles to tool roles. Test projects were implemented in the tool. At the conclusion of the trial, the group determined that the Gemini could meet its requirements management needs without use of a specialized requirements management tool, and the group identified a number of lessons learned which are described in the last major section of this paper. These lessons learned include how to conduct an organizational needs analysis prior to pursuing a tool; caveats concerning tool criteria and the selection process; the prerequisites and sequence of activities necessary to achieve an optimum configuration of the tool; the need for adequate staff resources and staff training; and a special note regarding organizations in transition and archiving of requirements.

  13. What's in a Name? Definitions and Conceptualisations of Teleworking and Homeworking.

    ERIC Educational Resources Information Center

    Sullivan, Cath

    2003-01-01

    Discusses the debate over definitions of teleworking and other home-based working. Argues that project-specific definitions are useful and inevitable. Challenges the assertion that a single definition should be used by all research. (Contains 36 references.) (JOW)

  14. A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

    NASA Technical Reports Server (NTRS)

    Vairo, Daniel M.

    1998-01-01

    The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

  15. Carbon Capture and Sequestration from a Hydrogen Production Facility in an Oil Refinery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engels, Cheryl; Williams, Bryan, Valluri, Kiranmal; Watwe, Ramchandra

    2010-06-21

    The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. Asmore » part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE?s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design

  16. The Nature and Impact of Task Definition: Information Problem Categorization during Task Definition within the Information Problem-Solving Process

    ERIC Educational Resources Information Center

    Marino, John L., Jr.

    2017-01-01

    Information literacy describes expertise in information problem-solving. This expertise includes facility in several endeavors addressed by the information behavior literature, including information needs, seeking, and use. Definitions and descriptions of information literacy suggest that this expertise is broadly applicable to a variety of…

  17. The Italy's D.P.C. - I.N.G.V. Project UNREST: Realization of an integrated method for the definition of the unrest phases at Campi Flegrei.

    NASA Astrophysics Data System (ADS)

    Civetta, Lucia; Del Pezzo, Edoardo

    2010-05-01

    In this poster we present the framework of the Project "UNREST" and the preliminary results obtained in the first 18 months of activity. The Campi Flegrei resurgent caldera, where several hundred thousands people live, have been characterized during last decades by several bradiseismic crises which determined the partial evacuation of the population, as for the crises in 1969-72 and 1982-84. Recent studies have revealed a process of unrest which continues since the fifties, and which presents characteristics similar to the several centuries-decades long unrest period which led to the last eruption in AD 1538. In the frame of last INGV-DPC Agreement a method has been developed, which allows accounting of any information and associated uncertainty coming from historical, field, and modelling studies, and from the monitoring network, providing a probability on the state of the volcano and on the occurrence of an eruption. In the present project this method is explored and developed, particularly through the experimentation of methods for the definition of reference parameters and thresholds, and of criteria and procedures to make it an operational tool useful for volcano surveillance and crisis management. The research in the project include the following points: a) Definition of the reference database for the validation of models of pre-eruptive dynamics. The database will include geologic, geophysic, geochemical, hydrological and hystorical data. b) Quantitative analysis of measured signals, and formulation of hypotheses on source mechanisms. c) Definition of a general conceptual model for the magma-rocks-geothermal system at Campi Flegrei. d) Physico-mathematical modelling and numerical simulation of the magmatic and geothermal process dynamics, and of the space-time relationships between such dynamics and the geophysical and geochemical signals measured at the surface. e) Definition of the critical parameters for the definition of the different unrest phases, and

  18. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  19. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  20. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...