Sample records for facility quarterly technical

  1. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less

  2. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

  3. ROYAL PALMLINED WALK TO FACILITY 1041 (QUARTERS J) WITH FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ROYAL PALM-LINED WALK TO FACILITY 1041 (QUARTERS J) WITH FACILITY 1040 (QUARTERS 1) TO LEFT. TAKEN AT CORNER OF HALE ALII AVENUE AND EIGHTH STREET. VIEW FACING EAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Hale Alii Avenue, Eighth Street, & Avenue D, Pearl City, Honolulu County, HI

  4. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information. Contents include the following: RTO Technical Publications: A Quarterly Listing. Implications of Multilingual Interoperability of Speech Technology for Military Use. Non-Lethal Weapons and Future Peace Enforcement Operations.

  5. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  6. CCC CAMP WICKIUP – OFFICE BUILDING, CENTER; TECHNICAL SERVICE QUARTERS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CCC CAMP WICKIUP – OFFICE BUILDING, CENTER; TECHNICAL SERVICE QUARTERS, RIGHT; EDUCATIONAL BUILDING, LEFT. Photocopy of historic photographs (original photograph on file at National Archives, Rocky Mountain Region, Denver, CO). Unknown USBR Photographer, December 9, 1938 - Wickiup Dam, Deschutes River, La Pine, Deschutes County, OR

  7. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current yearmore » and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  8. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  9. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwatermore » [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.« less

  10. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the

  11. Astronaut Charles Conrad poses in shower facility in crew quarters

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Astronaut Charles Conrad Jr., Skylab 2 commander, smiles for the camera after a hot bath in the shower facility in the crew quarters of the Orbital Workshop of the Skylab 2 space station cluster in Earth orbit. In deploying the shower facility the shower curtain is pulled up from the floor and attached to the ceiling. The water comes through a push-button shower head attached to a flexible hose. Water is drawn off by a vacuum system.

  12. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  13. ACHP | Historic Preservation in Technical or Scientific Facilities

    Science.gov Websites

    with the Operation of Highly Technical or Scientific Facilities Balancing Historic Preservation Needs with the Operation of Highly Technical or Scientific Facilities 1991; 79 pages; excerpt available Needs with the Operation of Highly Technical or Scientific Facilities considers the appropriate role of

  14. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of inmore » the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.« less

  15. West Hackberry Tertiary Project. Quarterly technical progress report, July 1--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the usemore » of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presented uneconomic. During this quarter, the West Hackberry Tertiary Project completed the first ten months of air injection operations. Plots of air injection rates and cumulative air injected are included in this report as attachments. The following events are reviewed in this quarter`s technical progress report: (1) successful workovers on the Gulf Land D Nos. 44, 45 and 51 and the Watkins No. 3; (2) the unsuccessful repair attempt on the Watkins No. 16; (3) gathering of additional bottom hole pressure data; (4) air compressor operations and repairs; and (5) technology transfer activities.« less

  16. Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-07-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore

  17. Crew Quarters (CQ) and Electromagnetic Interference (EMI) Measurement Facility Combined Impedance Study

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    This report documents an investigation into observed failures associated with conducted susceptibility testing of Crew Quarters (CQ) hardware in the Johnson Space Center (JSC) Electromagnetic Interference (EMI) Measurement Facility, and the work accomplished to identify the source of the observed behavior. Investigation led to the conclusion that the hardware power input impedance was interacting with the facility power impedance leading to instability at the observed frequencies of susceptibility. Testing performed in other facilities did not show this same behavior, pointing back to the EMI Measurement Facility power as the potential root cause. A LISN emulating the Station power bus impedance was inserted into the power circuit, and the susceptibility was eliminated from the measurements.

  18. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is

  19. Quarterly environmental data summary for first quarter 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent completemore » sets of quarterly data.« less

  20. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2011-02-01

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the currentmore » year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather

  1. Atmospheric Radiation Measurement program climate research facility operations quarterly report April 1 - June 30, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-07-26

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of

  2. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-04-23

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  3. Environmental Restoration (ER) Consolidated Quarterly Report_April to June 2017_ October 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the April, May, and June 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwatermore » [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III.« less

  4. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-01-24

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in

  5. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, DL

    2008-09-30

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  6. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-10-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments

  7. Technical Assistance for Arts Facilities: A Sourcebook. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…

  8. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-03-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period October 1 through December 31, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The first quarter comprises a total of 2,208 hours. For all fixed sites, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the first quarter of fiscal year (FY) 2007. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. NIM represents the AMF statistics for the current deployment in Niamey, Niger, Africa. PYE represents the AMF statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be

  9. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-05-22

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the

  10. Crew Quarters Modifications

    NASA Image and Video Library

    2018-03-30

    Modifications and upgrades are underway inside the Astronaut Crew Quarters in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The crew quarters are being prepared for the next generation of space explorers. The historic facility housed Apollo and space shuttle astronauts before and after their missions into space.

  11. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation ofmore » chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.« less

  12. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. L. Sisterson

    2010-01-12

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  13. REACTOR PHYSICS QUARTERLY REPORT JANUARY, FEBRUARY, MARCH 1970

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmid, L. C.; Clayton, E. D.; Heineman, R. E.

    1970-05-01

    The objective of the Reactor Physics Quarterly Report is to inform the scientific community in a timely manner of the technical progress made on the many phases of reactor physics work within the laboratory. The report contains brief technical discussions of accomplishments in all areas where significant progress has been made during the quarter.

  14. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995more » commitments.« less

  15. Strategic petroleum reserve supporting research. Quarterly technical report, January 1-March 31, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodward, P.W.

    1986-01-01

    The basic objective is to provide technical support to the Strategic Petroleum Reserve Office (SPRO), through the Bartlesville Project Office. This support includes routine analyses, experimental research, and technical consultation at the SPRO's request. Accomplishments for this past quarter include: stable D, /sup 34/S, and /sup 13/C isotope ratio analyses for 27 samples of SPR crude oil; gas chromatographic simulated distillation (Sim-dis) of 74 SPR crude samples; sim-dis of sludge samples to check for bimodal distributions; data for 8 comprehensive analyses have been entered into the Bonner and Moore ''Crude Assay II'' library; 25 samples which included both whole crudesmore » and distillate fractions were chromatographed using Siemens dual-oven GC and PIANO software; separation of 4 sludge samples into acid, base, and neutral fractions by ion exchange chromatography; and proton and sodium-23 NMR measurements of sludge samples. 1 fig., 5 tabs.« less

  16. Project LIFE--Language Improvement to Facilitate Education. (Technical Progress Report; Third Quarter; March 1, 1974-May 31, 1974).

    ERIC Educational Resources Information Center

    National Foundation for the Improvement of Education, Washington, DC.

    Reported is the third quarter, fiscal year 1974 (March 1, 1974-May 31, 1974) technical progress of Project LIFE (Language Improvement to Facilitate Education), toward developing an instructional system in which filmstrips in the areas of perceptual training, perceptual thinking, and language/reading are used to assist hearing impaired children in…

  17. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-10-08

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers

  18. Results For The Third Quarter Calendar Year 2016 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2016-10-13

    In this memorandum, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2016 (CY16) sample of Tank 50H salt solution are presented in tabulated form. The Third Quarter CY16 Tank 50H samples (a 200 mL sample obtained 6” below the surface (HTF-5-16-63) and a 1 L sample obtained 66” from the tank bottom (HTF-50-16-64)) were obtained on July 14, 2016 and received at Savannah River National Laboratory (SRNL) on the same day. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours, and the samples were pulled immediately after pumpmore » shut down. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY16 sampling of Tank 50H were requested by Savannah River Remediation (SRR) personnel and details of the testing are presented in the SRNL TTQAP.« less

  19. Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending December 31, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cash, R.J.; Dukelow, G.T.; Forbes, C.J.

    1993-03-01

    This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285{degrees}C (545{degrees}F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities thatmore » were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed.« less

  20. Quarterly environmental data summary for first quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored inmore » the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate

  1. Technical viability and development needs for waste forms and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pegg, I.; Gould, T.

    1996-05-01

    The objective of this breakout session was to provide a forum to discuss technical issues relating to plutonium-bearing waste forms and their disposal facilities. Specific topics for discussion included the technical viability and development needs associated with the waste forms and/or disposal facilities. The expected end result of the session was an in-depth (so far as the limited time would allow) discussion of key issues by the session participants. The session chairs expressed allowance for, and encouragement of, alternative points of view, as well as encouragement for discussion of any relevant topics not addressed in the paper presentations. It wasmore » not the intent of this session to recommend or advocate any one technology over another.« less

  2. The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

    NASA Technical Reports Server (NTRS)

    Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.

    1988-01-01

    The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

  3. Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 18

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Richter

    2007-03-31

    This eighteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of March 2007, and covers activities in the eighteenth project quarter, January 2007 – March 2007.

  4. Particulate Hot Gas Stream Cleanup Technical Issues: Quarterly report, July 1-September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pontius, D.H.

    1996-12-09

    This is the eighth in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic barrier filter elements. Task 1 is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis ofmore » ceramic filter elements. Under Task I during the past quarter, additional analyses were performed on ashes from the Ahlstrom 10 MWt Pressurized Fluidized Circulating Fluid Bed (PCFB) facility located at Karhula, Finland. Work continued on the HGCU data base being constructed in Microsoft Access. A variety of information has been entered into the data base, including numerical values, short or long text entries, and photographs. Detailed design of a bench top device for high temperature measurement of ash permeability has also begun. In addition to these activities, a paper was prepared and a poster was presented summarizing recent work performed under this contract at the 1996 DOE/METC Contractor`s Conference. A presentation was also given corresponding to the manuscript entitled Particle Characteristics and High-Temperature Filtration that was prepared for publication in the Proceedings of the Thirteenth Annual International Pittsburgh Coal Conference held this September in Pittsburgh, PA. Arrangements have been made to be present at the DOE/METC Modular Gas Cleanup Rig (MGCR) at the conclusion of the next run of the DOE/METC air blown Fluid Bed Gasifier (FBG). This visit will include on-site sampling to collect and characterize the filter cakes collected during FGB operation. Task 2 efforts during the past quarter

  5. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  6. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  7. Value Engineering. Technical Manual. School Facilities Development Procedures Manual.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    Value Engineering (VE) is a cost-optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. This technical manual provides guidance in developing the scope and applicability of VE to school projects; in…

  8. Computational modeling and experimental studies on NO{sub x} reduction under pulverized coal combustion conditions. Seventh quarterly technical progress report, July 1, 1996--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kumpaty, S.K.; Subramanian, K.; Nokku, V.P.

    1996-12-31

    During this quarter (July-August 1996), the experiments for nitric oxide reburning with a combination of methane and ammonia were conducted successfully. This marked the completion of gaseous phase experiments. Preparations are underway for the reburning studies with coal. A coal feeder was designed to suit our reactor facility which is being built by MK Fabrication. The coal feeder should be operational in the coming quarter. Presented here are the experimental results of NO reburning with methane/ammonia. The results are consistent with the computational work submitted in previous reports.

  9. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... assistance and Federal facilities and resources. 352.24 Section 352.24 Emergency Management and Assistance... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f) and...

  10. Pittsburgh Technical Health Training Institute Demonstration Project; Quarterly Report.

    ERIC Educational Resources Information Center

    Kishkunas, Louis J.

    This fifth quarterly report covers the period June 15, 1967 to December 15, 1967 of a project aimed at demonstrating a faster method of training higly qualified workers for the health field. During this period, nurse aides were trained in a pilot program based upon the educational objectives derived from entry level behavioral specifications…

  11. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information. Reports may be downloaded for free from the RTO website at http:/www.rta.nato.int or they may be purchased from the NASA Center for AeroSpace Information, 7121 Standard Drive, Hanover, MID 21076-1320 USA, phone 301-621-0390, fax 301-621-0134. Prices and order forms are available from the NASA STI website at http://www.sti.nasa.gov. An automatic distribution of unclassified RTO technical publications in CD-ROM is also available within the U.S. through the NASA Standing Order Service from the NASA Center for AeroSpace Information.

  12. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information. Reports may be downloaded for free from the RTO website at http://www.rta.nato.int or they may be purchased from the NASA Center for AeroSpace Information, 7121 Standard Drive, Hanover, MD 21076-1320 USA, phone 301-621-0390, fax 301-621-0134. Prices and order forms are available from the NASA STI website at http://www.sti.nasa.gov. An automatic distribution of unclassified RTO technical publications in CD-ROM is also available within the US through the NASA Standing Order Service from the NASA Center for AeroSpace Information.

  13. "Library Quarterly" Management Literature, 1931-2004

    ERIC Educational Resources Information Center

    Young, Arthur P.

    2006-01-01

    Management literature appearing in "Library Quarterly," 1931-2004, is examined in this essay. A total of 145 articles are identified that focus on administrative and managerial issues related to libraries during this period. Management literature is construed expansively and includes accounting, administration, assessment, budgets, facilities,…

  14. Automatically inserted technical details improve radiology report accuracy.

    PubMed

    Abujudeh, Hani H; Govindan, Siddharth; Narin, Ozden; Johnson, Jamlik Omari; Thrall, James H; Rosenthal, Daniel I

    2011-09-01

    To assess the effect of automatically inserted technical details on the concordance of a radiology report header with the actual procedure performed. The study was IRB approved and informed consent was waived. We obtained radiology report audit data from the hospital's compliance office from the period of January 2005 through December 2009 spanning a total of 20 financial quarters. A "discordance percentage" was defined as the percentage of total studies in which a procedure code change was made during auditing. Using Chi-square analysis we compared discordance percentages between reports with manually inserted technical details (MITD) and automatically inserted technical details (AITD). The second quarter data of 2007 was not included in the analysis as the switch from MITD to AITD occurred during this quarter. The hospital's compliance office audited 9,110 studies from 2005-2009. Excluding the 564 studies in the second quarter of 2007, we analyzed a total of 8,546 studies, 3,948 with MITD and 4,598 with AITD. The discordance percentage in the MITD group was 3.95% (156/3,948, range per quarter, 1.5- 6.1%). The AITD discordance percentage was 1.37% (63/4,598, range per quarter, 0.0-2.6%). A Chi-square analysis determined a statistically significant difference between the 2 groups (P < 0.001). There was a statistically significant improvement in the concordance of a radiology report header with the performed procedure using automatically inserted technical details compared to manually inserted details. Copyright © 2011 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  15. Combined Quarterly Technical Report Number 16. SATNET Development and Operation, Pluribus Satellite IMP Development, Remote Site Maintenance, Internet Development, Mobile Access Terminal Network.

    DTIC Science & Technology

    1980-02-01

    Reserch Projects Agency I t&* ISO~p~A d m* ab~b ~I 41 b~bmso 544,A UNCLASSIFIED S@MYT SLAMIICAIGH OF TNNI PAOE tpvm Gamb.______________ RI...Wi do m,.we a#& N m WUNP SMei r -- This Quarterly Technical Report describes work on the development of and experimentation with packet broadcast by...interval by either segmenting or aggregating the stream packets such that they match the system interval. Since this approach is simple with respect

  16. TECHNICAL GUIDANCE DOCUMENT: QUALITY ASSURANCE AND QUALITY CONTROL FOR WASTE CONTAINMENT FACILITIES

    EPA Science Inventory

    This Technical Guidance Document provides comprehensive guidance on procedures for quality assurance and quality control for waste containment facilities. he document includes a discussion of principles and concepts, compacted soil liners, soil drainage systems, geosynthetic drai...

  17. TECHNICAL GUIDANCE DOCUMENT: QUALITY ASSURANCE AND QUALITY CONTROL FOR WASTE CONTAINMENT FACILITIES

    EPA Science Inventory

    This Technical Guidance Document provides comprehensive guidance on procedures for quality assurance and quality control for waste containment facilities. The document includes a discussion of principles and concepts, compacted soil liners, soil drainage systems, geosynthetic dr...

  18. RTO Technical Report: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2002-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information from April 1,2002 through June 30, 2002. Topics covered include: intrusion detection and design loads for aircraft.

  19. Lawrence Livermore National Laboratory Safeguards and Security quarterly progress report to the US Department of Energy: Quarter ending December 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.

    1994-01-01

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the first quarter of fiscal year 1994 (October through December, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise.more » These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: (1) Safeguards Technology, (2) Safeguards and Decision Support, (3) Computer Security, (4) DOE Automated Physical Security, and (5) DOE Automated Visitor Access Control System. This report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.« less

  20. Results for the first quarter calendar year 2017 tank 50H salt solution sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C. L.

    2017-04-12

    In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pumpmore » shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY17 sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan (TTQAP). This memorandum is part of Deliverable 2 from SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50H saltstone task.« less

  1. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information from Oct 1, 2001 through Dec 31, 2001. This listing includes one citataion titled 'Logistics Test and Evaluation in Flight'.

  2. 117. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 12, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  3. 122. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    122. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "elevations & details" - structural, AS-BLT AW 35-46-04, sheet 73, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  4. 120. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    120. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "foundation & first floor plan" - structural, AS-BLT AW 35-46-04, sheet 65, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  5. 118. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 13, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  6. 119. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    119. Back side technical facilities S.R. radar transmitter & computer building no. 102, section I "tower plan, sections & details" - structural, AS-BLT AW 35-46-04, sheet 62, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  7. 121. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    121. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "sections & elevations" - structural, AS-BLT AW 35-46-04, sheet 72, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  8. FACILITY 316. EXTERIOR OBLIQUE OF FRONT AS SEEN FROM FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 316. EXTERIOR OBLIQUE OF FRONT AS SEEN FROM FACILITY 362. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  9. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2002-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information from Jan 1, 2002 through Mar 31, 2002. Topics covered included information management, ice accretion, digital flight control systems, supercavitation flows, and tactical decision aids.

  10. FACILITY 317. EXTERIOR OF FRONT SIDE, WITH FACILITY 316 BEYOND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 317. EXTERIOR OF FRONT SIDE, WITH FACILITY 316 BEYOND ON THE LEFT. VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  11. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the U.S. Department of Energy. Quarter ending December 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the First Quarter of Fiscal Year 1997 (October through December, 1996). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise.more » These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in four areas: (1) safeguards technology; (2) safeguards and material accountability; (3) computer security--distributed systems; and (4) physical and personnel security support. The remainder of this report describes the activities in each of these four areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.« less

  12. Remote sensing of natural resources: Quarterly literature review

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A quarterly review of technical literature concerning remote sensing techniques is presented. The format contains indexed and abstracted materials with emphasis on data gathering techniques performed or obtained remotely from space, aircraft, or ground-based stations. Remote sensor applications including the remote sensing of natural resources are presented.

  13. 75 FR 5784 - Guidance on Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public Utilities; Notice of Technical Conference January 28, 2010. Take notice that Commission staff will convene a technical conference... final agenda of the technical conference. The March 3, 2010 technical conference will focus on the...

  14. Enhanced oil recovery utilizing high-angle wells in the Frontier Formation, Badger Basin Field, Park County, Wyoming. Quarterly technical progress report, 1 March 1993--30 June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fortmann, R.G.; Walker, J.P.

    1993-07-10

    Sierra Energy Company`s targeted goals during the third quarter of this Cooperative Agreement included the following objectives from the Statement of Work: in Phase 2A, completion of subtask 2.1.2--acquire best possible field data in the 3-D seismic program; and initiation of Subtask 2.1.3--process acquired 3-D seismic data. Technical progress is described for these tasks.

  15. USDI DCS technical support: Mississippi Test Facility

    NASA Technical Reports Server (NTRS)

    Preble, D. M.

    1975-01-01

    The objective of the technical support effort is to provide hardware and data processing support to DCS users so that application of the system may be simply and effectively implemented. Technical support at Mississippi Test Facility (MTF) is concerned primarily with on-site hardware. The first objective of the DCP hardware support was to assure that standard measuring apparatus and techniques used by the USGS could be adapted to the DCS. The second objective was to try to standardize the miscellaneous variety of parameters into a standard instrument set. The third objective was to provide the necessary accessories to simplify the use and complement the capabilities of the DCP. The standard USGS sites have been interfaced and are presently operating. These sites are stream gauge, ground water level and line operated quality of water. Evapotranspiration, meteorological and battery operated quality of water sites are planned for near future DCP operation. Three accessories which are under test or development are the Chu antenna, solar power supply and add-on memory. The DCP has proven to be relatively easy to interface with many monitors. The large antenna is awkward to install and transport. The DCS has met the original requirements well; it has and is proving that an operation, satellite-based data collection system is feasible.

  16. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Technical assistance...

  17. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Technical assistance...

  18. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Technical assistance...

  19. Quarterly Reporting of Government-Funded Activity to the 2015 National VET Provider Collection. Technical Paper

    ERIC Educational Resources Information Center

    Foley, Paul

    2016-01-01

    The topic of more frequent and timely vocational education and training (VET) data has been an issue of interest for a number of years. Since 2015, the National Centre for Vocational Education Research (NCVER) has collected and reported data on government-funded students and courses on a quarterly basis. These quarterly data submissions are…

  20. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  1. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  2. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  3. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  4. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This is a listing of recent unclassified RTO technical publications for April 1, 2004 through June 30, 2004, processed by the NASA Center for AeroSpace Information. Topics covered include: heat transfer and cooling in propulsion and power systems; assessment of operator functional state; microwaves; aerodynamics in solid rocket propulsion; command, control, communications and intelligence modeling; personal protective equipment against anti-personnel mine blast; and data fusion and visualization.

  5. Pedestrian and bicycle facilities in California : a technical reference and technology transfer synthesis for Caltrans planners and engineers.

    DOT National Transportation Integrated Search

    2005-07-01

    The primary purpose of Pedestrian and Bicycle Facilities in CaliforniaA : Technical Reference and Technology Transfer Synthesis for Caltrans Planners : and Engineers (Technical Reference) is to provide Caltrans staff : with a synthesis of in...

  6. Repositioning the Facilities in Technical College Workshops for Efficiency: A Case Study of North Central Nigeria

    ERIC Educational Resources Information Center

    Umar, Ibrahim Y.; Ma'aji, Abdullahi S.

    2010-01-01

    This article focuses on assessing the facilities in Government Technical College workshops in the context of a developing country. A descriptive survey design was adopted. Two research questions and a hypothesis were formulated to guide the study. A 35-item questionnaire was developed based on the National Board for Technical Education (NBTE)…

  7. Facility Instrumentation for SOFIA: Technical Specifications and Scientific Goals

    NASA Astrophysics Data System (ADS)

    Stacey, G. J.

    2000-05-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne observatory consisting of a 2.5 m telescope in a modified Boeing 747 SP. First light is expected in late 2002. Three "Facility Class" instruments were among the first generation of instruments selected to fly on SOFIA. These instruments, currently under development are (1) a 5 to 38 um imaging photometer based on twin As:Si and Sb:Sb BIB arrays (FORCAST), (2) a 40 to 300 um photometer based on three arrays of bolometers, and (3) a 17 to 210 um eschelle grating spectrometer based on an Sb:Sb BIB array and a Ge:Sb and stressed Ge:Ga array of photoconductors. I will discuss both the technical aspects of these facility instruments, and some of the exciting new science that is possible with these ground breaking instruments on an airborne 2.5 meter telescope. Science topics include circumstellar debris disks, star formation, the Galactic Center, and distant galaxies.

  8. Trends in antenatal care attendance and health facility delivery following community and health facility systems strengthening interventions in Northern Uganda.

    PubMed

    Ediau, Michael; Wanyenze, Rhoda K; Machingaidze, Simba; Otim, George; Olwedo, Alex; Iriso, Robert; Tumwesigye, Nazarius M

    2013-10-18

    Maternal morbidity and mortality remains high in Uganda; largely due to inadequate antenatal care (ANC), low skilled deliveries and poor quality of other maternal health services. In order to address both the demand and quality of ANC and skilled deliveries, we introduced community mobilization and health facility capacity strengthening interventions. Interventions were introduced between January 2010 and September 2011. These included: training health workers, provision of medical supplies, community mobilization using village health teams, music dance and drama groups and male partner access clubs. These activities were implemented at Kitgum Matidi health center III and its catchment area. Routinely collected health facility data on selected outcomes in the year preceding the interventions and after 21 months of implementation of the interventions was reviewed. Trend analysis was performed using excel and statistical significance testing was performed using EPINFO StatCal option. The number of pregnant women attending the first ANC visit significantly increased from 114 to 150 in the first and fourth quarter of 2010 (OR 1.72; 95% CI 1.39-2.12) and to 202 in the third quarter of 2011(OR 11.41; 95% CI 7.97-16.34). The number of pregnant women counselled, tested and given results for HIV during the first ANC attendance significantly rose from 92 (80.7%) to 146 (97.3%) in the first and fourth quarter of 2010 and then to 201 (99.5%) in the third quarter of 2011. The number of male partners counseled, tested and given results together with their wives at first ANC visit rose from 13 (16.7%) in the fourth quarter of 2009 to 130 (89%) in the fourth quarter of 2010 and to 180 (89.6%) in the third quarter of 2011. There was a significant rise in the number of pregnant women delivering in the health facility with provision of mama-kits (delivery kits), from 74 (55.2%) to 149 (99.3%) in the second and fourth quarter of 2010. Combined community and facility systems

  9. Technical Facilities Management, Loan Pool, and Calibration

    NASA Technical Reports Server (NTRS)

    Smith, Jacob

    2011-01-01

    My work at JPL for the SURF program began on June 11, 2012 with the Technical Facilities Management group (TFM). As well as TFM, I worked with Loan Pool and Metrology to help them out with various tasks. Unlike a lot of other interns, I did not have a specific project rather many different tasks to be completed over the course of the 10 weeks.The first task to be completed was to sort through old certification reports in 6 different boxes to locate reports that needed to be archived into a digital database. There were no reports within these boxes that needed to be archived but rather were to be shredded. The reports went back to the early 1980's and up to the early 2000's. I was looking for reports dated from 2002 to 2012

  10. 4. Northeast corner of quarters (executive officer's quarters), looking onto ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Northeast corner of quarters (executive officer's quarters), looking onto Quarter R (commanding officer's quarters), looking southeast - Naval Air Station Chase Field, Texas State Highway 202, 4.8 miles east of intersection of Texas State Highway 202 & U.S. State Highway 181, Beeville, Bee County, TX

  11. The TRIGA Reactor Facility at the Armed Forces Radiobiology Research Institute: A Simplified Technical Description.

    DTIC Science & Technology

    1986-05-01

    COUNT Technical FROM_ TO May 1986 20 16. SUPPLEMENTARY NOTATION 17. COSATI CODES 18. SUBJECT TERMS iConitinue on reverse if neceasary and identify by...Reactor, Modes of Operation, The AFRRI Reactor, Exposure Facilities, and Cerenkov Radiation. I- 20 DISTRISUTIONIAVAILABILITY OF ABSTRACT 21. ABSTRACT...6 Exposure Facilities 12 Cerenkov Radiation 17 Acoessiofl For NTIS GRA&I DT.C TABUnamnnounced [] UusnriOfltond -. By IZ Distribution/ Availability

  12. 75 FR 9203 - Guidance on Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public Utilities; Supplemental Notice of Technical Conference February 22, 2010. As announced in the ``Notice of Technical Conference'' issued on January 28, 2010, a technical conference will be held on March 3, 2010, from 9 a.m. to 3 p.m...

  13. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Facilities construction. 136.110 Section 136.110... Facilities and Services § 136.110 Facilities construction. In addition to other requirements of this subpart..., clinic, health station or quarters for housing personnel associated with such facilities, must in its...

  14. Integrated Disposal Facility FY 2012 Glass Testing Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pierce, Eric M.; Kerisit, Sebastien N.; Krogstad, Eirik J.

    2013-03-29

    PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Keymore » activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.« less

  15. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assistance reports. Each technical assistance grantee must submit to VA a quarterly report describing the... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance reports. 61.55 Section 61.55 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS...

  16. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assistance reports. Each technical assistance grantee must submit to VA a quarterly report describing the... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance reports. 61.55 Section 61.55 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS...

  17. MECHANIZATION STUDY OF THE TECHNICAL LIBRARY U.S. NAVAL AVIONICS FACILITY, INDIANAPOLIS, INDIANA.

    ERIC Educational Resources Information Center

    KERSHAW, G.A.; AND OTHERS

    THE NAVAL AVIONICS FACILITY, INDIANAPOLIS (NAFI) TECHNICAL LIBRARY IS PLANNING A MECHANIZED SYSTEM TO PRODUCE A PERMUTED INDEX OF PERTINENT PERIODICAL REFERENCES AND PROCEEDINGS, WITH BOOKS AND DOCUMENTS TO BE ADDED LATER. INPUT TO THE SYSTEM IS PUNCHED PAPER TAPE PREPARED FROM THE SOURCE MATERIAL, AND THE PRIMARY PROGRAM IS A "CANNED"…

  18. Hybrid 240 Ton Off Highway Haul Truck: Quarterly Technical Status Report 19, DOE/AL68080-TSR19

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Richter

    2007-06-30

    This nineteenth quarterly status report for the Hybrid Off Highway Vehicle (OHV) project, DOE Award DE-FC04-02AL68080 presents the project status at the end of June 2007, and covers activities in the nineteenth project quarter, April 2007 – June 2007.

  19. 1. North side of quarters (executive officer's quarters), looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. North side of quarters (executive officer's quarters), looking southeast - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  20. 5. East side of quarters (executive officer's quarters), looking west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. East side of quarters (executive officer's quarters), looking west - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  1. 2. West side of quarters (executive officer's quarters), looking east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. West side of quarters (executive officer's quarters), looking east - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  2. 4. South side of quarters (executive officer's quarters), looking north ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. South side of quarters (executive officer's quarters), looking north - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  3. 3. Southwest side of quarters (executive officer's quarters), looking northeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southwest side of quarters (executive officer's quarters), looking northeast - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  4. 3. Southwest side of quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southwest side of quarters R (commanding officer's quarters), looking east - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  5. 6. Interior of quarters (executive officer's quarters), living room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Interior of quarters (executive officer's quarters), living room, looking west - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  6. 1. Northeast side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Northeast side of Quarters R (commanding officer's quarters), looking west - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  7. 2. Southeast side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Southeast side of Quarters R (commanding officer's quarters), looking northwest - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  8. 4. Northwest side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Northwest side of Quarters R (commanding officer's quarters), looking southeast - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  9. Measurement of solids motion in gas-fluidized beds. Technical progress report, 1 October 1982-31 December 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, M.M.; Chao, B.T.

    This technical progress report covers the progress made during the fifth quarter of the project entitled Measurements of Solids Motion in Gas Fluidized Beds under Grant No. DOE-F22-81PC40804 during the period 1 October through 31 December 1982. The research concerns the measurement of solids particle velocity distribution and residence time distribution using the Computer-Aided Particle Tracking Facility (CAPTF) at the University of Illinois at Urbana-Champaign. The experimental equipment and measuring methods used to determine particle size distribution and particle motion and the results obtained are presented.

  10. 5. Interior of Quarters R (commanding officer's quarters), living room, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Interior of Quarters R (commanding officer's quarters), living room, looking northwest - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  11. Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-04

    The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroadsmore » of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.« less

  12. Residential Group Care Quarterly. Volume 5, Number 1, Summer 2004

    ERIC Educational Resources Information Center

    Kirkwood, Scott, Ed.

    2004-01-01

    This issue of "Residential Group Care Quarterly" contains the following articles: (1) "National Definitions and Data Collection for Residential Care Facilities' Use of Restraint and Seclusion" (Lloyd Bullard); (2) "CWLA Publishes Best Practices in Behavior Support and Intervention Assessment Instrument" (Nupur Gupta); (3) "Initial Findings of an…

  13. Acquisition Review quarterly. Vol. 1, No. 3, Summer 1994

    DTIC Science & Technology

    1994-01-01

    implications , and suggests the use of explicit demand curves. 281 - GUIDELINES FOR AUTHORS Acquisition Review Quarterly Summer 1994 - ii The Lemon Juice...environment. This attention is long overdue. Defense Department installations cover tens of millions oQf square miles of the American landscape. If you look...Commission Report, Facing Towards Governments - Nongovernmental Organi- zations and Scientific and Technical Advice (New York: Carnegie Commission, January

  14. Idaho National Laboratory Quarterly Occurrence Analysis 4th Quarter FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System, as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 84 reportable events (29 from the 4th quarter fiscal year 2016 and 55 from the prior three reporting quarters), as well as 39 other issue reports (including events found to be not reportable and Significant Category A and Bmore » conditions) identified at INL during the past 12 months (two from this quarter and 37 from the prior three quarters).« less

  15. SATNET development and operation. Pluribus satellite IMP development. Remote site maintenance. Internet operations and maintenance. Mobile access terminal network. TCP for the HP3000. TCP-TAC. TCP for VAX-UNIX. Combined quarterly technical report

    NASA Astrophysics Data System (ADS)

    Bressler, R. D.

    1981-11-01

    This quarterly technical report describes work on the development of and experimentation with packet broadcast by satellite; on development of Pluribus Satellite IMPs; on a study of the technology of Remote Site Maintenance; on Internetwork monitoring; on shipboard satellite communications; and on the development of Transmission Control Protocols for the HP3000, TAC, and VAX-UNIX.

  16. Geothermal direct-heat utilization assistance. Quarterly report, January - March 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lienau, P.

    1997-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-97. It describes 176 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on well pumping in commercial groundwater heat pump systems. A memorandum of understanding between the GHC and EIA is described. Work accomplishments on the Guidebook are discussed. Outreach activities include the publication of a geothermal direct usemore » Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.« less

  17. Research on solvent-refined coal. Quarterly technical progress report, April 1, 1981-June 30, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-10-01

    This report describes progress on the Research on Solvent Refined Coal project by The Pittsburg and Midway Coal Mining Co.'s Merriam Laboratory during the second quarter of 1981. Alexander Mine coal was evaluated as a feedstock for major liquefaction facilities and had a yield structure similar to other reactive Pittsburgh seam coals at standard SRC II conditions. Two lots of coal from the Ireland Mine (Pittsburgh seam) were found to be of nearly the same composition and produced essentially the same yields. Two experiments in which coal-derived nonvolatile organic matter was processed without fresh coal feed indicate constant rates ofmore » conversion of SRC to oil and gas. Insoluble organic matter (IOM) remained unconverted. The naphtha and middle distillate products from the deep conversion contained less sulfur but more nitrogen than those from conventional SRC II processing. Encouraging results were obtained when a very small amount of iron oxide dispersed on alumina was added to Kaiparowits coal which cannot be processed at normal SRC II conditions without added catalyst. Subbituminous coals from the McKinley and Edna Mines were processed successfully with added pyrite but would not run when the added catalyst was removed.« less

  18. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2010; minimum data set, version 3.0 for skilled nursing facilities and Medicaid nursing facilities. Final rule.

    PubMed

    2009-08-11

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs), for fiscal year (FY) 2010. In addition, it recalibrates the case-mix indexes so that they more accurately reflect parity in expenditures related to the implementation of case-mix refinements in January 2006. It also discusses the results of our ongoing analysis of nursing home staff time measurement data collected in the Staff Time and Resource Intensity Verification project, as well as a new Resource Utilization Groups, version 4 case-mix classification model for FY 2011 that will use the updated Minimum Data Set 3.0 resident assessment for case-mix classification. In addition, this final rule discusses the public comments that we have received on these and other issues, including a possible requirement for the quarterly reporting of nursing home staffing data, as well as on applying the quality monitoring mechanism in place for all other SNF PPS facilities to rural swing-bed hospitals. Finally, this final rule revises the regulations to incorporate certain technical corrections.

  19. Technical quality of delivery care in private- and public-sector health facilities in Enugu and Lagos States, Nigeria.

    PubMed

    Hirose, Atsumi; Yisa, Ibrahim O; Aminu, Amina; Afolabi, Nathanael; Olasunmbo, Makinde; Oluka, George; Muhammad, Khalilu; Hussein, Julia

    2018-06-01

    Private-sector providers are increasingly being recognized as important contributors to the delivery of healthcare. Countries with high disease burdens and limited public-sector resources are considering using the private sector to achieve universal health coverage. However, evidence for the technical quality of private-sector care is lacking. This study assesses the technical quality of maternal healthcare during delivery in public- and private-sector facilities in resource-limited settings, from a systems and programmatic perspective. A summary index (the skilled attendance index, SAI), was used. Two-staged cluster sampling with stratification was used to select representative samples of case records in public- and private-sector facilities in Enugu and Lagos States, Nigeria. Information to assess criteria was extracted, and the SAI calculated. Linear regression models examined the relationship between SAI and the private and public sectors, controlling for confounders. The median SAI was 54.8% in Enugu and 85.7% in Lagos. The private for-profit sector's SAI was lower than and the private not-for-profit sector's SAI was higher than the public sector in Enugu [coefficient = -3.6 (P = 0.018) and 12.6 (P < 0.001), respectively]. In Lagos, the private for-profit sector's SAI was higher and the private not-for-profit sector's SAI was lower than the public sector [3.71 (P = 0.005) and -3.92 (P < 0.001)]. Results indicate that the technical quality of private for-profit providers' care was poorer than public providers where the public provision of care was weak, while private for-profit facilities provided better technical quality care than public facilities where the public sector was strong and there was a relatively strong regulatory body. Our findings raise important considerations relating to the quality of maternity care, the public-private mix and needs for regulation in global efforts to achieve universal healthcare.

  20. 9 CFR 351.10 - Facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...

  1. 9 CFR 351.10 - Facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...

  2. 9 CFR 351.10 - Facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...

  3. 9 CFR 351.10 - Facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...

  4. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information covering the period from July 1, 2005 to September 30, 2005; and available in the NASA Aeronautics and Space Database. Contents include: Aeroelastic Deformation: Adaptation of Wind Tunnel Measurement Concepts to Full-Scale Vehicle Flight Testing; Actively Controlling Buffet-Induced Excitations; Modelling and Simulation to Address NATO's New and Existing Military Requirements; Latency in Visionic Systems: Test Methods and Requirements; Personal Hearing Protection including Active Noise Reduction; Virtual Laboratory Enabling Collaborative Research in Applied Vehicle Technologies; A Method to Analyze Tail Buffet Loads of Aircraft; Particle Image Velocimetry Measurements to Evaluate the Effectiveness of Deck-Edge Columnar Vortex Generators on Aircraft Carriers; Introduction to Flight Test Engineering, Volume 14; Pathological Aspects and Associated Biodynamics in Aircraft Accident Investigation;

  5. System Control Facilities: Head-Ends and Central Processors. A Survey of Technical Requirements for Broadband Cable Teleservices; Volume Four.

    ERIC Educational Resources Information Center

    Smith, Ernest K.; And Others

    The system control facilities in broadband communication systems are discussed in this report. These facilities consist of head-ends and central processors. The first section summarizes technical problems and needs, and the second offers a cursory overview of systems, along with an incidental mention of processors. Section 3 looks at the question…

  6. Idaho National Laboratory Quarterly Occurrence Analysis - 3rd Quarter FY-2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 73 reportable events (23 from the 3rd Qtr FY-16 and 50 from the prior three reporting quarters), as well as 45 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (16 from this quarter and 29 from the prior three quarters).« less

  7. Idaho National Laboratory Quarterly Occurrence Analysis - 1st Quarter FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 74 reportable events (16 from the 1st Qtr FY-16 and 58 from the prior three reporting quarters), as well as 35 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (15 from this quarter and 20 from the prior three quarters).« less

  8. EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.

    2010-04-20

    The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

  9. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  10. Comparison of Perceived and Technical Healthcare Quality in Primary Health Facilities: Implications for a Sustainable National Health Insurance Scheme in Ghana

    PubMed Central

    Alhassan, Robert Kaba; Duku, Stephen Opoku; Janssens, Wendy; Nketiah-Amponsah, Edward; Spieker, Nicole; van Ostenberg, Paul; Arhinful, Daniel Kojo; Pradhan, Menno; Rinke de Wit, Tobias F.

    2015-01-01

    Background Quality care in health facilities is critical for a sustainable health insurance system because of its influence on clients’ decisions to participate in health insurance and utilize health services. Exploration of the different dimensions of healthcare quality and their associations will help determine more effective quality improvement interventions and health insurance sustainability strategies, especially in resource constrained countries in Africa where universal access to good quality care remains a challenge. Purpose To examine the differences in perceptions of clients and health staff on quality healthcare and determine if these perceptions are associated with technical quality proxies in health facilities. Implications of the findings for a sustainable National Health Insurance Scheme (NHIS) in Ghana are also discussed. Methods This is a cross-sectional study in two southern regions in Ghana involving 64 primary health facilities: 1,903 households and 324 health staff. Data collection lasted from March to June, 2012. A Wilcoxon-Mann-Whitney test was performed to determine differences in client and health staff perceptions of quality healthcare. Spearman’s rank correlation test was used to ascertain associations between perceived and technical quality care proxies in health facilities, and ordered logistic regression employed to predict the determinants of client and staff-perceived quality healthcare. Results Negative association was found between technical quality and client-perceived quality care (coef. = -0.0991, p<0.0001). Significant staff-client perception differences were found in all healthcare quality proxies, suggesting some level of unbalanced commitment to quality improvement and potential information asymmetry between clients and service providers. Overall, the findings suggest that increased efforts towards technical quality care alone will not necessarily translate into better client-perceived quality care and willingness to

  11. Comparison of Perceived and Technical Healthcare Quality in Primary Health Facilities: Implications for a Sustainable National Health Insurance Scheme in Ghana.

    PubMed

    Alhassan, Robert Kaba; Duku, Stephen Opoku; Janssens, Wendy; Nketiah-Amponsah, Edward; Spieker, Nicole; van Ostenberg, Paul; Arhinful, Daniel Kojo; Pradhan, Menno; Rinke de Wit, Tobias F

    2015-01-01

    Quality care in health facilities is critical for a sustainable health insurance system because of its influence on clients' decisions to participate in health insurance and utilize health services. Exploration of the different dimensions of healthcare quality and their associations will help determine more effective quality improvement interventions and health insurance sustainability strategies, especially in resource constrained countries in Africa where universal access to good quality care remains a challenge. To examine the differences in perceptions of clients and health staff on quality healthcare and determine if these perceptions are associated with technical quality proxies in health facilities. Implications of the findings for a sustainable National Health Insurance Scheme (NHIS) in Ghana are also discussed. This is a cross-sectional study in two southern regions in Ghana involving 64 primary health facilities: 1,903 households and 324 health staff. Data collection lasted from March to June, 2012. A Wilcoxon-Mann-Whitney test was performed to determine differences in client and health staff perceptions of quality healthcare. Spearman's rank correlation test was used to ascertain associations between perceived and technical quality care proxies in health facilities, and ordered logistic regression employed to predict the determinants of client and staff-perceived quality healthcare. Negative association was found between technical quality and client-perceived quality care (coef. = -0.0991, p<0.0001). Significant staff-client perception differences were found in all healthcare quality proxies, suggesting some level of unbalanced commitment to quality improvement and potential information asymmetry between clients and service providers. Overall, the findings suggest that increased efforts towards technical quality care alone will not necessarily translate into better client-perceived quality care and willingness to utilize health services in NHIS

  12. My Career and the "Rhetoric of" Technical Writing and Communication

    ERIC Educational Resources Information Center

    Schuster, Mary Lay

    2015-01-01

    This article traces the history of Mary Schuster's career in technical writing and communication from 1968 when she took a position in the Publications Department at the Institute of Electrical and Electronics Engineers (IEEE) to her work at "Technical Communication Quarterly" ("TCQ") in 2003 and forward. She discusses the…

  13. Technical Aspects Regarding the Management of Radioactive Waste from Decommissioning of Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dragolici, F.; Turcanu, C. N.; Rotarescu, G.

    2003-02-25

    The proper application of the nuclear techniques and technologies in Romania started in 1957, once with the commissioning of the Research Reactor VVR-S from IFIN-HH-Magurele. During the last 45 years, appear thousands of nuclear application units with extremely diverse profiles (research, biology, medicine, education, agriculture, transport, all types of industry) which used different nuclear facilities containing radioactive sources and generating a great variety of radioactive waste during the decommissioning after the operation lifetime is accomplished. A new aspect appears by the planning of VVR-S Research Reactor decommissioning which will be a new source of radioactive waste generated by decontamination, disassemblingmore » and demolition activities. By construction and exploitation of the Radioactive Waste Treatment Plant (STDR)--Magurele and the National Repository for Low and Intermediate Radioactive Waste (DNDR)--Baita, Bihor county, in Romania was solved the management of radioactive wastes arising from operation and decommissioning of small nuclear facilities, being assured the protection of the people and environment. The present paper makes a review of the present technical status of the Romanian waste management facilities, especially raising on treatment capabilities of ''problem'' wastes such as Ra-266, Pu-238, Am-241 Co-60, Co-57, Sr-90, Cs-137 sealed sources from industrial, research and medical applications. Also, contain a preliminary estimation of quantities and types of wastes, which would result during the decommissioning project of the VVR-S Research Reactor from IFIN-HH giving attention to some special category of wastes like aluminum, graphite and equipment, components and structures that became radioactive through neutron activation. After analyzing the technical and scientific potential of STDR and DNDR to handle big amounts of wastes resulting from the decommissioning of VVR-S Research Reactor and small nuclear facilities, the

  14. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Amongmore » these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.« less

  15. Idaho National Laboratory Quarterly Occurrence Analysis for the 1st Quarter FY2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 82 reportable events (13 from the 1st quarter (Qtr) of fiscal year (FY) 2017 and 68 from the prior three reporting quarters), as well as 31 other issue reports (including events found to be not reportable and Significantmore » Category A and B conditions) identified at INL during the past 12 months (seven from this quarter and 24 from the prior three quarters).« less

  16. Treatment of Race/Ethnicity in Career-Technical Education Research

    ERIC Educational Resources Information Center

    Rojewski, Jay W.; Xing, Xue

    2013-01-01

    This study examined how researchers of career-technical education have treated the construct of race/ethnicity in recent studies. Fifty-one of 71 articles published in the Career and Technical Education Research (CTER) over a 7-year span (2005-2011) were included. A content analysis found that only one quarter (n = 13, 25.49%) of eligible studies…

  17. 9 CFR 351.10 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Facilities. 351.10 Section 351.10... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be...

  18. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, R.S.; Diamante, J.M.; Duffey, R.B.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less

  19. Research on solvent-refined coal. Quarterly technical progress report, July 1-September 30, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-07-01

    This report describes progress on the Research on Solvent Refined Coal project by The Pittsburg and Midway Coal Mining Company's Merriam Laboratory during the third quarter of 1981. A four-part experiment was conducted with subbituminous Edna coal, pyrite and/or bituminous Ireland coal at 457/sup 0/C and 1800 psig or 450/sup 0/C and 2250 psig. The purpose was to determine the conditions appropriate for processing a 50/50 by weight blend of these coals. A total of four runs (11 experiments) discussed this quarter were directed toward the study of disposable catalysts. Subbituminous coals from the Edna and Belle Ayr Mines weremore » processed in the SRC II mode. Additives investigated were pyrite, ferric oxide, molybdenum doped ferric oxide and iron dispersed on silica-alumina. The level and type of sulfur added in conjunction with ferric oxide catalysts was also explored as well as addition of sulfur by itself. Two solvent hydrogenation runs and five SRC I runs were directed toward a preliminary investigation of short residence time processing of western (Belle Ayr) coals.« less

  20. Dependability of technical items: Problems of standardization

    NASA Astrophysics Data System (ADS)

    Fedotova, G. A.; Voropai, N. I.; Kovalev, G. F.

    2016-12-01

    This paper is concerned with problems blown up in the development of a new version of the Interstate Standard GOST 27.002 "Industrial product dependability. Terms and definitions". This Standard covers a wide range of technical items and is used in numerous regulations, specifications, standard and technical documentation. A currently available State Standard GOST 27.002-89 was introduced in 1990. Its development involved a participation of scientists and experts from different technical areas, its draft was debated in different audiences and constantly refined, so it was a high quality document. However, after 25 years of its application it's become necessary to develop a new version of the Standard that would reflect the current understanding of industrial dependability, accounting for the changes taking place in Russia in the production, management and development of various technical systems and facilities. The development of a new version of the Standard makes it possible to generalize on a terminological level the knowledge and experience in the area of reliability of technical items, accumulated over a quarter of the century in different industries and reliability research schools, to account for domestic and foreign experience of standardization. Working on the new version of the Standard, we have faced a number of issues and problems on harmonization with the International Standard IEC 60500-192, caused first of all by different approaches to the use of terms and differences in the mentalities of experts from different countries. The paper focuses on the problems related to the chapter "Maintenance, restoration and repair", which caused difficulties for the developers to harmonize term definitions both with experts and the International Standard, which is mainly related to differences between the Russian concept and practice of maintenance and repair and foreign ones.

  1. Health Facility Graduation from Donor-Supported Intensive Technical Assistance and Associated Factors in Zambia.

    PubMed

    Koni, Phillip; Chishinga, Nathaniel; Nyirenda, Lameck; Kasonde, Prisca; Nsakanya, Richard; Welsh, Michael

    2015-01-01

    The FHI360-led Zambia Prevention Care and Treatment partnership II (ZPCT II) with funding from United States Agency for International Development, supports the Zambian Ministry of Health in scaling up HIV/AIDS services. To improve the quality of HIV/AIDS services, ZPCT II provides technical assistance until desired standards are met and districts are weaned-off intensive technical support, a process referred to as district graduation. This study describes the graduation process and determines performance domains associated with district graduation. Data were collected from 275 health facilities in 39 districts in 5 provinces of Zambia between 2008 and 2012. Performance in technical capacity, commodity management, data management and human resources domains were assessed in the following services areas: HIV counselling and testing and prevention of mother to child transmission, antiretroviral therapy/clinical care, pharmacy and laboratory. The overall mean percentage score was calculated by obtaining the mean of mean percentage scores for the four domains. Logistic regression models were used to obtain odds ratios (OR) and 95% confidence intervals (CI) for the domain mean percentage scores in graduated versus non-graduated districts; according to rural-urban, and province strata. 24 districts out of 39 graduated from intensive donor supported technical assistance while 15 districts did not graduate. The overall mean percentage score for all four domains was statistically significantly higher in graduated than non-graduated districts (93.2% versus 91.2%, OR = 1.34, 95%CI:1.20-1.49); including rural settings (92.4% versus 89.4%, OR = 1.43,95%CI:1.24-1.65). The mean percentage score in human resource domain was statistically significantly higher in graduated than non-graduated districts (93.6% versus 71.6%, OR = 5.81, 95%CI: 4.29-7.86) and in both rural and urban settings. QA/QI tools can be used to assess performance at health facilities and determine readiness for

  2. Health Facility Graduation from Donor-Supported Intensive Technical Assistance and Associated Factors in Zambia

    PubMed Central

    Koni, Phillip; Chishinga, Nathaniel; Nyirenda, Lameck; Kasonde, Prisca; Nsakanya, Richard; Welsh, Michael

    2015-01-01

    Introduction The FHI360-led Zambia Prevention Care and Treatment partnership II (ZPCT II) with funding from United States Agency for International Development, supports the Zambian Ministry of Health in scaling up HIV/AIDS services. To improve the quality of HIV/AIDS services, ZPCT II provides technical assistance until desired standards are met and districts are weaned-off intensive technical support, a process referred to as district graduation. This study describes the graduation process and determines performance domains associated with district graduation. Methods Data were collected from 275 health facilities in 39 districts in 5 provinces of Zambia between 2008 and 2012. Performance in technical capacity, commodity management, data management and human resources domains were assessed in the following services areas: HIV counselling and testing and prevention of mother to child transmission, antiretroviral therapy/clinical care, pharmacy and laboratory. The overall mean percentage score was calculated by obtaining the mean of mean percentage scores for the four domains. Logistic regression models were used to obtain odds ratios (OR) and 95% confidence intervals (CI) for the domain mean percentage scores in graduated versus non-graduated districts; according to rural-urban, and province strata. Results 24 districts out of 39 graduated from intensive donor supported technical assistance while 15 districts did not graduate. The overall mean percentage score for all four domains was statistically significantly higher in graduated than non-graduated districts (93.2% versus 91.2%, OR = 1.34, 95%CI:1.20–1.49); including rural settings (92.4% versus 89.4%, OR = 1.43,95%CI:1.24–1.65). The mean percentage score in human resource domain was statistically significantly higher in graduated than non-graduated districts (93.6% versus 71.6%, OR = 5.81, 95%CI: 4.29–7.86) and in both rural and urban settings. Conclusions QA/QI tools can be used to assess performance at

  3. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, March 15-16, 1979, Tampa, Florida. Third quarterly progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-04-24

    The eleventh quarterly coordination meeting of the methane production group of the Fuels From Biomass Systems Branch, US Department of Energy was held at Tampa, Florida, March 15-16, 1979. Progress reports were presented by the contractors and a site visit was made to Kaplan Industries, Bartow, Florida to see the Hamilton Standard demonstration facility for digestion of environmental feedlot residue to methane. A meeting agenda, a list of attendees, and progress reports are presented.

  4. Writing: the Quarterly as text.

    PubMed

    Locke, Lawrence F

    2005-06-01

    The purpose of this essay is to examine how writing has shaped the nature of the Quarterly over 75 years. Here I explore how stylistic elements have changed over time, how form has interacted with function and content, and how well the resulting text has served the several communities within physical education. I make the following assertions. First, the writing style that has become the model for research reports is needlessly dense and daunting for readers. Second, the desire to maintain a journal that serves both as an interdisciplinary resource for a broad audience of physical educators and as an outlet for reports directed to limited audiences of technical specialists has prevented full performance of either function. Those concerns notwithstanding, I find good cause for celebration--as well as for guarded optimism about the future.

  5. Quail Egg compared to a quarter

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Quail eggs are small (shown here with a quarter for scale) and develop quickly, making them ideal for space experiments. The Avian Development Facility (ADF) supports 36 eggs in two carousels (below), one of which rotates to provide a 1-g control for comparing to eggs grown in microgravity. The ADF originated in NASA's Shuttle Student Involvement program in the 1980s and was developed under the NASA Small Business Irnovation Research program. In late 2001, the ADF made its first flight and carried eggs used in two investigations, Development and function of the inner-ear balance system in normal and altered gravity environments, and Skeletal development in embryonic quail.

  6. Longitudinal variation in pressure injury incidence among long-term aged care facilities.

    PubMed

    Jorgensen, Mikaela; Siette, Joyce; Georgiou, Andrew; Westbrook, Johanna I

    2018-05-04

    To examine variation in pressure injury (PI) incidence among long-term aged care facilities and identify resident- and facility-level factors that explain this variation. Longitudinal incidence study using routinely-collected electronic care management data. A large aged care service provider in New South Wales and the Australian Capital Territory, Australia. About 6556 people aged 65 years and older who were permanent residents in 60 long-term care facilities between December 2014 and November 2016. Risk-adjusted PI incidence rates over eight study quarters. Incidence density over the study period was 1.33 pressure injuries per 1000 resident days (95% confidence interval (CI) = 1.29-1.37). Funnel plots were used to identify variation among facilities. On average, 14% of facilities had risk-adjusted PI rates that were higher than expected in each quarter (above 95% funnel plot control limits). Ten percent of facilities had persistently high rates in any three or more consecutive quarters (n = 6). The variation between facilities was only partly explained by resident characteristics in multilevel regression models. Residents were more likely to have higher-pressure injury rates in facilities in regional areas compared with major city areas (adjusted incidence rate ratio = 1.25, 95% CI = 1.04-1.51), and facilities with persistently high rates were more likely to be located in areas with low socioeconomic status (P = 0.038). There is considerable variation among facilities in PI incidence. This study demonstrates the potential of routinely-collected care management data to monitor PI incidence and to identify facilities that may benefit from targeted intervention.

  7. TECHNICAL REPORTS DATABASE

    EPA Science Inventory

    The Defense Technical Information Center (DTIC?) is the central facility for the collection and dissemination of scientific and technical information for the Department of Defense (DoD). Much of this information is made available by DTIC in the form of technical reports about com...

  8. CSSEDC Quarterly. 1989.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1989-01-01

    These four issues of the CSSEDC Quarterly (Conference for Secondary School English Department Chairpersons) represent the quarterly for 1989. Articles in number 1 deal with professional development, and include: "Sharing Expertise within a Department" (Martha R. Dolly); "Empowerment Develops a Computer Writing Center" (Norman…

  9. International nuclear fuel cycle fact book. [Contains glossary of organizations, facilities, technical and other terms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    The International Nuclear Fuel Cycle Fact Book has been compiled in an effort to provide current data concerning fuel cycle and waste management facilities, R D programs and key personnel on 23 countries, including the US, four multi-national agencies, and 21 nuclear societies. The Fact Book is organized as follows: National summaries-a section for each country which summarizes nuclear policy, describes organizational relationships, and provides addresses and names of key personnel and information on facilities. International agencies-a section for each of the international agencies which has significant fuel cycle involvement and a listing of nuclear societies. Glossary-a list of abbreviations/acronymsmore » of organizations, facilities, technical and other terms. The national summaries, in addition to the data described above, feature a small map for each country as well as some general information. The latter presented from the perspective of the Fact Book user in the United States.« less

  10. CSSEDC Quarterly. 1990.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1990-01-01

    These four issues of the CSSEDC Quarterly (Conference for Secondary School English Department Chairpersons) represent the quarterly for 1990. Articles in number 1 deal with student teachers and include: "Student Teaching: Smoothing Out the Rough Spots" (Susan B. Argyle and Fred C. Feitler); "A Partnership for Urban Student…

  11. Quarterly Coal Distribution

    EIA Publications

    2017-01-01

    The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding Annual Coal Distribution Report.

  12. Detoxification and generation of useful products from coal combustion wastes: Quarterly technical report, (October--December 1988)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1988-01-01

    This quarter, samples of dry fly ash, wet bottom ash, and desulfurization gypsum slurry were provided from an Ohio Edison power plant. Chemical analysis mineralogical examination, and an anion analysis were performed on the samples. 2 figs., 1 tab. (CBS)

  13. Boiling eXperiment Facility (BXF) Fluid Toxicity Technical Interchange Meeting (TIM) with the Payload Safety Review Panel (PSRP)

    NASA Technical Reports Server (NTRS)

    Sheredy, William A.

    2012-01-01

    A Technical Interchange meeting was held between the payload developers for the Boiling eXperiment Facility (BXF) and the NASA Safety Review Panel concerning operational anomaly that resulted in overheating one of the fluid heaters, shorted a 24VDC power supply and generated Perfluoroisobutylene (PFiB) from Perfluorohexane.

  14. Temporal Changes in Technical and Physical Performances During a Small-Sided Game in Elite Youth Soccer Players

    PubMed Central

    Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S

    2016-01-01

    Background There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players’ technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. Objectives The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Methods Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h-1), accelerations and decelerations (> 2.0 m•s-2 and - 2.0 m•s-2), metabolic power (W•kg-1), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. Results All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). Conclusions The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG’s for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance

  15. Temporal Changes in Technical and Physical Performances During a Small-Sided Game in Elite Youth Soccer Players.

    PubMed

    Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S

    2016-12-01

    There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players' technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h -1 ), accelerations and decelerations (> 2.0 m•s -2 and - 2.0 m•s -2 ), metabolic power (W•kg -1 ), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG's for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance, should be included taking into account the

  16. 78 FR 17394 - Filing via the Internet; Electronic Tariff Filings; Revisions to Electric Quarterly Report Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM07-16-000; RM01-5-000; RM12-3-000] Filing via the Internet; Electronic Tariff Filings; Revisions to Electric Quarterly Report Filing Process; Notice of Technical Conference Take notice that on April 16, 2013, the staff of the...

  17. 1st Quarter Transportation Report FY2017: Waste Shipments To and From the Nevada National Security Site (NNSS), Radioactive Waste Management Complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 1st quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW) and classified non-radioactive (CNR) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2017.

  18. The AMTEX Partnership. Third quarterly report, FY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lemon, D.K.; Quisenberry, R.K.

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textilemore » resource conservation.« less

  19. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less

  20. 29 CFR 548.306 - Average earnings for year or quarter year preceding the current quarter.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PAY Interpretations Authorized Basic Rates § 548.306 Average earnings for year or quarter year... regular rates of pay during the current quarter year, and (ii) such average hourly remuneration during the... 29 Labor 3 2011-07-01 2011-07-01 false Average earnings for year or quarter year preceding the...

  1. Natural Gas Imports and Exports. Third Quarter Report 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditionsmore » and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network

  2. 7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...

  3. 7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...

  4. 7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...

  5. FACILITY 814, COURTYARD AND NORTHEAST WING, VIEW FACING SOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, COURTYARD AND NORTHEAST WING, VIEW FACING SOUTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  6. Washington State Board for Community and Technical Colleges Enrollment and Staffing Report, Fall 2014

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2014

    2014-01-01

    The "Fall Enrollment and Staffing Report 2014" provides a snapshot of enrollments in community and technical colleges during fall quarter 2014. The report addresses the questions most commonly raised regarding the community and technical colleges in Washington. The primary source of information for this document is the State Board for…

  7. Washington State Board for Community and Technical Colleges Enrollment and Staffing Report, Fall 2013

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2013

    2013-01-01

    The "Fall Enrollment and Staffing Report 2013" provides a snapshot of enrollments in community and technical colleges during fall quarter 2013. The report addresses the questions most commonly raised regarding the community and technical colleges in Washington. The primary source of information for this document is the State Board for…

  8. English Leadership Quarterly. 1991.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1991-01-01

    These four issues of the English Leadership Quarterly represent the quarterly for 1991. Articles in number 1 deal with whole language and include: "CEL: Shorter and Better" (Myles D. Eley); "Toward a New Philosophy of Language Learning" (Kathleen Strickland); "Whole Language: Implications for Secondary Classrooms"…

  9. ARM Climate Research Facility Quarterly Ingest Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, A.; Sivaraman, C.

    2016-10-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  10. ARM Climate Research Facility Quarterly Ingest Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, A.; Sivaraman, C.

    2016-07-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  11. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  12. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  13. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  14. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  15. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly physical inventory to account for all sealed sources and for devices containing depleted uranium received... 10 Energy 1 2010-01-01 2010-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR...

  16. FACILITY 363, INTERIOR. LANAI OFF KITCHEN. VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. LANAI OFF KITCHEN. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  17. Amarillo National Resource Center for Plutonium quarterly technical progress report, August 1, 1997--October 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report summarizes activities of the Amarillo National Resource Center for Plutonium during the quarter. The report describes the Electronic Resource Library; DOE support activities; current and future environmental health and safety programs; pollution prevention and pollution avoidance; communication, education, training, and community involvement programs; and nuclear and other material studies, including plutonium storage and disposition studies.

  18. Electric Power Quarterly, July-September 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-29

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the Energy Information Administration (EIA), to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275) as amended. This edition of the EPQ contains monthly data for the third quarter of 1985.

  19. Results For The Fourth Quarter 2014 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2015-09-30

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2014 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  20. Gas-Grain Simulation Facility (GGSF). Volume 1: Stage 1 facility definition studies

    NASA Technical Reports Server (NTRS)

    Gat, Nahum

    1993-01-01

    The Gas-Grain Simulation Facility (GGSF) is a facility-type payload to be included in the Space Station Freedom (SSF). The GGSF is a multidisciplinary facility that will accommodate several classes of experiments, including exobiology, planetary science, atmospheric science, and astrophysics. The physical mechanisms envisioned to be investigated include crystal growth, aggregation, nucleation, coagulation, condensation, collisions, fractal growth, cycles of freezing and evaporation, scavenging, longevity of bacteria, and more. TRW performed a Phase A study that included analyses of the science and technical (S&T) requirements, the development of facility functional requirements, and a conceptual design of the facility. The work that was performed under Stage 1 of the Phase A study and the results to date are summarized. In this stage, facility definition studies were conducted in sufficient detail to establish the technical feasibility of the candidate strawman experiments. The studies identified technical difficulties, identified required facility subsystems, surveyed existing technology studies and established preliminary facility weight, volume, power consumption, data systems, interface definition, and crew time requirements. The results of this study served as the basis for Stage 2 of the Phase A study in which a conceptual design and a reference design were performed. The results also served as a basis for a related study for a Gas-Grain Simulation Experiment Module (GGSEM), which is an apparatus intended to perform a subset of the GGSF experiments on board a low-Earth-orbiting platform.

  1. FACILITY 814, FRONT AND SOUTHEAST SIDE, OBLIQUE VIEW FACING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, FRONT AND SOUTHEAST SIDE, OBLIQUE VIEW FACING NORTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  2. FACILITY 814, COURTYARD AND SOUTHEAST WING, OBLIQUE VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, COURTYARD AND SOUTHEAST WING, OBLIQUE VIEW FACING SOUTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  3. FACILITY 802B, BEDROOM ADJACENT TO BATHROOM, VIEW FACING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, BEDROOM ADJACENT TO BATHROOM, VIEW FACING NORTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  4. InterFacility communications technical document 1.1

    DOT National Transportation Integrated Search

    1996-04-01

    InterFacility (IF) communications allows 2 adjacent air traffic control (ATC) facilities to communicate with each other. IF is simulated in TGF to allow whatever lab we are responding to (ARTS/NAS) to simulate communications with one or more adjacent...

  5. Idaho National Laboratory Quarterly Occurrence Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 85 reportable events (18 from the 4th Qtr FY-15 and 67 from the prior three reporting quarters), as well as 25 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (8 from this quarter and 17 from the prior three quarters).« less

  6. Defense Attache Saigon: RNAVF Quarterly Assessment. 2nd Quarter FY74.

    DTIC Science & Technology

    1974-02-01

    Military Assistance Command Vietnam MAP Military Assistance Program UNCLASSIFIED F IUNCLASSIFIES MASI Military Assistance Service Funded MATT Military Air...8217 operating the school. The average yearly budget is 2,~4oo,000 piasters, whiuh averages out to less than five cents per student per day. This is... average daily cargo handling rate of 959 M/T for the 2nd quarter FY711 shows continued improvement over the 773 M/T rate attained during the 1st quarter

  7. FACILITY 802B, LIVING ROOM AND ENTRY, VIEW FACING EASTNORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, LIVING ROOM AND ENTRY, VIEW FACING EAST-NORTHEAST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  8. FACILITY 89. WEST FRONT. U.S. Naval Base, Pearl Harbor, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. WEST FRONT. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  9. 75 FR 18255 - Passenger Facility Charge Database System for Air Carrier Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Facility Charge Database System for Air Carrier Reporting AGENCY: Federal Aviation Administration (FAA... the Passenger Facility Charge (PFC) database system to report PFC quarterly report information. In... developed a national PFC database system in order to more easily track the PFC program on a nationwide basis...

  10. FACILITY 89. INTERIOR OF MASTER BATHROOM. VIEW FACING SOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF MASTER BATHROOM. VIEW FACING SOUTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  11. Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisbeth A. Mitchell

    2014-06-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

  12. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model constructionmore » specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.« less

  13. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushingmore » (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.« less

  14. FACILITY 814, SOUTHEAST SIDE AND REAR, SHOWING COURTYARD BETWEEN WINGS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, SOUTHEAST SIDE AND REAR, SHOWING COURTYARD BETWEEN WINGS, OBLIQUE VIEW FACING WEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  15. FACILITY 52. EAST FRONT. VIEW FACING WEST. U.S. Naval ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 52. EAST FRONT. VIEW FACING WEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type J, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  16. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  17. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  18. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  19. Design and prototyping of HL-LHC double quarter wave crab cavities for SPS test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Verdu-Andres, S.; Skaritka, J.; Wu, Q.

    2015-05-03

    The LHC high luminosity project envisages the use of the crabbing technique for increasing and levelling the LHC luminosity. Double Quarter Wave (DQW) resonators are compact cavities especially designed to meet the technical and performance requirements for LHC beam crabbing. Two DQW crab cavities are under fabrication and will be tested with beam in the Super Proton Synchrotron (SPS) at CERN by 2017. This paper describes the design and prototyping of the DQW crab cavities for the SPS test.

  20. Quarterly coal report, October--December 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-05-23

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1994 and aggregated quarterlymore » historical data for 1986 through the third quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.« less

  1. Electric power quarterly, January-March 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-07-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, Federal and State agencies, industry, and the general public.

  2. 19 CFR 159.34 - Certified quarterly rate.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY (CONTINUED) LIQUIDATION OF DUTIES Conversion of Foreign Currency § 159.34 Certified quarterly rate. (a) Countries for which quarterly rate is certified. For the currency of each of the following... York for such foreign currency for a day in that quarter: Australia, Austria, Belgium, Brazil, Canada...

  3. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  4. FACILITY 363, INTERIOR. LIVING ROOM LOOKING TOWARDS BLACK LANAI. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. LIVING ROOM LOOKING TOWARDS BLACK LANAI. VIEW FACING NORTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  5. FACILITY 802B, BATHROOM CONVERTED TO LAUNDRY ROOM, VIEW FACING WESTNORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, BATHROOM CONVERTED TO LAUNDRY ROOM, VIEW FACING WEST-NORTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  6. Earth integrated design: office dormitory facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H. B.; Barnes, P. R.

    1980-01-01

    The generation process of the design of the Joint Institute for Heavy Ion Research is described. Architectural and energy considerations are discussed. The facility will contain living quarters for guest scientists who come to Oak Ridge to conduct short experiments and sleeping alcoves for local researchers on long experimental shifts as well as office space. (MHR)

  7. FACILITY 363, INTERIOR. KITCHEN AS SEEN FROM LIVING ROOM ENTRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. KITCHEN AS SEEN FROM LIVING ROOM ENTRY . VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  8. FACILITY 363, INTERIOR. PANTRY AS SEEN FROM LANAI OFF KITCHEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. PANTRY AS SEEN FROM LANAI OFF KITCHEN . VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  9. FACILITY 52. OBLIQUE OF REAR AND SIDE. VIEW FACING SOUTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 52. OBLIQUE OF REAR AND SIDE. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type J, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  10. FACILITY 89. OBLIQUE OF SIDE AND REAR. VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. OBLIQUE OF SIDE AND REAR. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  11. FACILITY 89. FRONT OBLIQUE TAKEN FROM DRIVEWAY. VIEW FACING NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. FRONT OBLIQUE TAKEN FROM DRIVEWAY. VIEW FACING NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  12. FACILITY 802B, HALLWAY, LOOKING TOWARD REAR OF HOUSE, VIEW FACING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, HALLWAY, LOOKING TOWARD REAR OF HOUSE, VIEW FACING SOUTH-SOUTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  13. Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth A.

    2013-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information” requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

  14. Educational Technology Program. Quarterly Technical Summary, Period Ending 31 May 1970.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    An overview of the Lincoln Training System (LTS) and descriptions of the hardward and software of the LTS-1 and LTS-2 systems are provided. The overall program seeks to develop, test, and evaluate technical aids to vocational training systems. These are appropriate to this field because the high costs need to be reduced and because there are clear…

  15. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  16. Commercial space and launch insurance : current market and future outlook : fourth quarter 2002 Quarterly Launch Report

    DOT National Transportation Integrated Search

    2002-01-01

    Since the last review of the space and launch insurance industry (see "Update of the Space and Launch Insurance Industry," 4th quarter, : 1998 Quarterly Launch Report), many changes have occurred in the market. This report endeavors to examine the cu...

  17. Idaho National Laboratory Quarterly Performance Analysis for the 2nd Quarter FY 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth A.

    2015-04-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of events for the 2nd Qtr FY-15.

  18. Electric power quarterly, July-September 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-02-04

    The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Form 423 are presented on a plant-by-plant basis. The EPQ presents a quarterly summary of disturbances andmore » unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on Form IE-417.« less

  19. The NASA Lewis Research Center Water Tunnel Facility

    NASA Technical Reports Server (NTRS)

    Wasserbauer, Charles A.

    1997-01-01

    A water tunnel facility specifically designed to investigate internal fluid duct flows has been built at the NASA Research Center. It is built in a modular fashion so that a variety of internal flow test hardware can be installed in the facility with minimal facility reconfiguration. The facility and test hardware interfaces are discussed along with design constraints for future test hardware. The inlet chamber flow conditioning approach is also detailed. Instrumentation and data acquisition capabilities are discussed. The incoming flow quality has been documented for about one quarter of the current facility operating range. At that range, there is some scatter in the data in the turbulent boundary layer which approaches 10 percent of the duct radius leading to a uniform core.

  20. Quarterly technical progress report, February 1, 1996--April 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report from the Amarillo National REsource Center for PLutonium provides research highlights and provides information regarding the public dissemination of information. The center is a a scientific resource for information regarding the issues of the storage, disposition, potential utilization and transport of plutonium, high explosives, and other hazardous materials generated from nuclear weapons dismantlement. The center responds to informational needs and interpretation of technical and scientific data raised by interested parties and advisory groups. Also, research efforts are carried out on remedial action programs and biological/agricultural studies.

  1. Quarterly Performance/Technical Report of the National Marrow Donor Program

    DTIC Science & Technology

    2010-03-31

    Implemented the Business to Business ( B2B ) Gateway and Business Services to support : • Incoming HLA typing results incorporating HLA Nomenclature changes...maintenance was performed. IIA.3.2 Task 2: Critical Facility and Staff Related Functions Period 6 Activity: • Business Continuity Planning: o Continued...department development of appropriate detailed tasks to be tested at a remote (non-NMDP controlled) location for the 2010 Business Continuity

  2. Hawaiian Volcano Observatory 1960 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  3. Hawaiian Volcano Observatory 1959 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  4. Hawaiian Volcano Observatory 1971 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1961 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1958 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1962 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1970 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1973 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1966 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. Hawaiian Volcano Observatory 1965 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  12. Hawaiian Volcano Observatory 1964 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  13. Hawaiian Volcano Observatory 1957 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  14. Hawaiian Volcano Observatory 1972 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  15. Hawaiian Volcano Observatory 1969 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  16. Hawaiian Volcano Observatory 1967 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  17. Hawaiian Volcano Observatory 1968 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  18. Hawaiian Volcano Observatory 1963 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  19. Advanced direct coal liquefaction concepts. Quarterly report, July 1--September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, D.J.; Parker, R.J.; Simpson, P.L.

    All the reports required for completion of the contract were submitted this quarter. A proposal for further work in Phase 2 was also submitted. The technical and economic assessment of the process was completed. The results show that for the base case scenario (25% equity, 15% after tax DCF-ROE) coal derived synthetic crude oil can be produced at just below US $30 per barrel. The study was based on the production of 75,000 BPD of C{sub 4+} synthetic crude oil from Black Thunder coal for subsequent processing in a conventional petroleum refinery from Black Thunder (Wyoming) subbituminous coal.

  20. FACILITY 89. INTERIOR OF MASTER BEDROOM, AS SEEN FROM DOORWAY. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF MASTER BEDROOM, AS SEEN FROM DOORWAY. VIEW FACING NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  1. FACILITY 89. INTERIOR OF LIVING ROOM, TAKEN THROUGH BEVELED OPENING. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF LIVING ROOM, TAKEN THROUGH BEVELED OPENING. VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  2. (Study of the behavioral and biological effects of high intensity 60 Hz electric fields): Quarterly technical progress report No. 29

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orr, J.L.

    1989-07-14

    Activities this quarter involved all phases of the project plus a meeting of the Joint Committee in Tokyo. Detailed mapping of the exposure facility is scheduled to be completed during the week of August 14, 1989. Both electric and magnetic fields should be available for tests of the components of the tether and blood sampling system for the neuroendocrine pilot study in September 1989. The groups for the social behavior study are stabilizing appropriately. Details on the formation of the groups and their status has been provided. Dr. Coelho has included information related to aspects of the social experiment rangingmore » from age estimation in baboons through the cardiovascular consequences of psychosocial stress. In addition, a draft manuscript is included on the data from the previous experiments which describes the effects of 30 and 60 kV/m electric fields on the social behavior of baboons. Tests of the blood handling procedures and analysis methods have been completed. With the exception of the catecholamine analyses, the handling procedures and variability in replicate measurements are satisfactory. Logistic and practical considerations now weigh strongly against including the analysis of the blood samples for catecholamines. Preliminary tests indicate that a sampling procedure which will work for the other compounds is probably not satisfactory for the catecholamines.« less

  3. Quarterly Technical Progress Report - Investigation of Syngas Interaction in Alcohol Synthesis Catalysts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murty A. Akundi

    This report presents the work done on " Investigation of Syngas Interaction in Alcohol Synthesis Catalysts" during the last quarter. The major activity during this period is on FTIR absorption studies of Co/Cr catalysts using CO as a probe molecule. Transition metals cobalt and copper play significant roles in the conversion of syngas (CO + H2 ) to liquid fuels. With a view to examine the nature of interaction between CO and metal, the FTIR spectra of CO adsorbed on Co-Cr2 O3 composites were investigated. The results indicate that as cobalt loading increases, the intensity of the CO adsorption bandsmore » increase and several vibrational modes seem to be promoted. Heat treatment of the sample revealed two distinct processes of adsorption. Bands due to physisorption disappeared while bands due to chemisorption not only increased in intensity but persisted even after desorption. It seems that the physisorption process is more active when the catalyst is fresh and is hindered when carbidic/carbonyl formations occur on the metal surfaces.« less

  4. Electric Power Quarterly, July-September 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-01-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  5. Electric Power Quarterly, October-December 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-04-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  6. Computational Modeling and Experimental Studies on NO(x) Reduction Under Pulveerized Coal Combustion Conditions. Quarterly technical progress report, July 1 - September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kumpaty, S.K.; Subramanian, K.; Darboe, A.

    1997-12-31

    Several experiments were conducted during this quarter to study the NO{sub x} reduction effectiveness of lignite coal, activated carbon and catalytic sites such as calcium sulfide and calcium carbide. While some of the coals/chemicals could be fed easily, some needed the mixing with silica gel to result in a uniform flow through the feeder. Several trial runs were performed to ensure proper feeding of the material before conducting the actual experiment to record NO{sub x} reduction. The experimental approach has been the same as presented in the past two quarterly reports with the coal reburning experiments. Partial reduction is achievedmore » through methane addition for SR2=0.95 conditions and then coal or the catalyst is introduced to see if there is further reduction. Presented below are the results of the experiments conducted during this quarter.« less

  7. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birdsell, Kay Hanson; Stauffer, Philip H.; Atchley, Adam Lee

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis (PA/CA) maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the PA/CA are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2016 annual review for Area G.

  8. 78 FR 59093 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2013 rail cost adjustment factor (RCAF) and cost index filed by the Association of American Railroads. The fourth quarter 2013 RCAF...

  9. 5 CFR 332.311 - Quarterly examinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Quarterly examinations. 332.311 Section... AND SELECTION THROUGH COMPETITIVE EXAMINATION Period of Competition and Eligibility Acceptance of Applications After Closing Date of Examinations § 332.311 Quarterly examinations. (a) A 10-point preference...

  10. Electric Power Quarterly, January-March 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-07-21

    The ''Electric Power Quarterly (EPQ)'' provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The ''EPQ'' contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  11. FACILITY 1042. FRONT OBLIQUE SHOWING ROYAL PALMS LINING FRONT WALK. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 1042. FRONT OBLIQUE SHOWING ROYAL PALMS LINING FRONT WALK. VIEW FACING SOUTHEAST - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Junior Officers' Quarters Type, 9-10 Hale Alii Avenue, 1-2 Eighth Street, Pearl City, Honolulu County, HI

  12. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a) Each licensee shall maintain records of the quarterly inventory of sealed sources and of devices... 10 Energy 1 2010-01-01 2010-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy...

  13. Electric Power Quarterly, January-March 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-07-01

    The Electric Power Quarterly (EPQ), a new series in the EIA statistical publications, provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the EIA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275). This edition of the EPQ contains monthly data for the first quarter of 1983. In this report, data collected on Form EIA-759 regarding electricmore » utilities' net generation, fuel consumption, and fuel stocks are presented for the first time on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.« less

  14. Natural gas imports and exports. Second quarter report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

  15. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility as well as each non-public utility with more than a de minimis market presence shall file an updated Electric Quarterly Report with the...

  16. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility as well as each non-public utility with more than a de minimis market presence shall file an updated Electric Quarterly Report with the...

  17. LOOKING ALONG HALE ALII AVENUE TOWARD SHIPYARD AREA. FACILITIES 1040 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOOKING ALONG HALE ALII AVENUE TOWARD SHIPYARD AREA. FACILITIES 1040 AND 1041 (QUARTERS 1 AND J) AT LEFT. VIEW FACING SOUTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Hale Alii Avenue, Eighth Street, & Avenue D, Pearl City, Honolulu County, HI

  18. Survey of aircraft icing simulation test facilities in North America

    NASA Technical Reports Server (NTRS)

    Olsen, W.

    1981-01-01

    A survey was made of the aircraft icing simulation facilities in North America: there are 12 wind tunnels, 28 engine test facilities, 6 aircraft tankers and 14 low velocity facilities, that perform aircraft icing tests full or part time. The location and size of the facility, its speed and temperature range, icing cloud parameters, and the technical person to contact are surveyed. Results are presented in tabular form. The capabilities of each facility were estimated by its technical contact person. The adequacy of these facilities for various types of icing tests is discussed.

  19. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  20. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  1. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  2. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  3. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, July 1, 1995--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-01

    This report is the quarterly progress report for July through September 1995 for work done by Tulane and Xavier Universities under DOE contract number DE-FG01-93-EW53023. Accomplishments for various tasks including administrative activities, collaborative cluster projects, education projects, initiation projects, coordinated instrumentation facility, and an investigators` retreat are detailed in the report.

  4. Technical Publications

    Science.gov Websites

    peer-reviewed journal Conference reports Technical memos documenting equipment or other technology Science, HEP User Facility. Fermilab is managed by Fermi Research Alliance, LLC (FRA), acting under data, apparatus, product, or process disclosed, or represents that its use would not infringe privately

  5. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  6. FACILITY 89. INTERIOR OF ENTRY AND STAIR, WITH DINING ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF ENTRY AND STAIR, WITH DINING ROOM TO LEFT, AS SEEN FROM LIVING ROOM. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  7. FACILITY 89. INTERIOR OF SECONDFLOOR HALLWAY, AS SEEN FROM MASTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF SECOND-FLOOR HALLWAY, AS SEEN FROM MASTER BEDROOM. CLOSET OVER STAIRWAY AT LEFT. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  8. Environmental effects of dredging. Documentation of the dyecon module for ADDAMS: Determining the hydraulic retention and efficiency of confined disposal facilities. Technical note

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hayes, D.F.; Schroeder, P.R.; Engler, R.M.

    This technical note describes procedures for determining mean hydraulic retention time and efficiency of a confined disposal facility (CDF) from a dye tracer slug test. These parameters are required to properly design a CDF for solids retention and for effluent quality considerations. Detailed information on conduct and analysis of dye tracer studies can be found in Engineer Manual 1110-2-5027, Confined Dredged Material Disposal. This technical note documents the DYECON computer program which facilitates the analysis of dye tracer concentration data and computes the hydraulic efficiency of a CDF as part of the Automated Dredging and Disposal Alternatives Management System (ADDAMS).

  9. Skylab (SL)-3 Crewmen - Checklist - Crew Quarters - Orbital Workshop Simulator (OWS) Trainer - JSC

    NASA Image and Video Library

    1973-01-01

    S73-28793 (16 July 1973) --- The three crewmen of the second manned Skylab mission (Skylab 3) go over a checklist during preflight training at the Johnson Space Center. They are, left to right, scientist-astronaut Owen K. Garriott, science pilot; astronaut Alan L. Bean, commander; and astronaut Jack R. Lousma, pilot. They are in the crew quarters of the Orbital Workshop trainer in the Mission Training and Simulation Facility, Building 5, at JSC. Skylab 3 is scheduled as a 59-day mission in Earth orbit. Photo credit: NASA

  10. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    French, Sean B.; Stauffer, Philip H.; Birdsell, Kay H.

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis (PA/CA) are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2015 annual review for Area G.

  11. VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    CONRAD, M.J.; VALENTINE, I.E.

    IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…

  12. Estimation of optimal biomass fraction measuring cycle formunicipal solid waste incineration facilities in Korea.

    PubMed

    Kang, Seongmin; Cha, Jae Hyung; Hong, Yoon-Jung; Lee, Daekyeom; Kim, Ki-Hyun; Jeon, Eui-Chan

    2018-01-01

    This study estimates the optimum sampling cycle using a statistical method for biomass fraction. More than ten samples were collected from each of the three municipal solid waste (MSW) facilities between June 2013 and March 2015 and the biomass fraction was analyzed. The analysis data were grouped into monthly, quarterly, semi-annual, and annual intervals and the optimum sampling cycle for the detection of the biomass fraction was estimated. Biomass fraction data did not show a normal distribution. Therefore, the non-parametric Kruskal-Wallis test was applied to compare the average values for each sample group. The Kruskal-Wallis test results showed that the average monthly, quarterly, semi-annual, and annual values for all three MSW incineration facilities were equal. Therefore, the biomass fraction at the MSW incineration facilities should be calculated on a yearly cycle which is the longest period of the temporal cycles tested. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. United States housing, third quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    The U.S. housing construction market’s third quarter was subdued, as all sectors moderated or declined. Once again, consensus expectations were for aggregate housing market gains, and these expectations were not realized. Overall starts, housing under construction, and completion data indicated quarterly improvement. Viewed from a recent his¬torical context, all...

  14. 2. View to northeast showing quarters and outbuildings, L to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View to northeast showing quarters and outbuildings, L to R: Service Building (HABS No. VA-1287-D), Medical Officer's Quarters C (in background), Garage (HABS No. VA-1287-F), and Medical Officer's Quarters B - Portsmouth Naval Hospital, Medical Officer's Quarters C, West side Williamson Drive, 400 feet South of Rixey Drive, Portsmouth, Portsmouth, VA

  15. 77 FR 51705 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY...: FMCSA withdraws its June 27, 2012, direct final rule eliminating the quarterly financial reporting... future proposing the elimination of the quarterly financial reporting requirements for Form QFR and Form...

  16. The ISOLDE facility

    NASA Astrophysics Data System (ADS)

    Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.

    2017-09-01

    The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).

  17. Facility-level outcome performance measures for nursing homes.

    PubMed

    Porell, F; Caro, F G

    1998-12-01

    Risk-adjusted nursing home performance scores were developed for four health outcomes and five quality indicators from resident-level longitudinal case-mix reimbursement data for Medicaid residents of more than 500 nursing homes in Massachusetts. Facility performance was measured by comparing actual resident outcomes with expected outcomes derived from quarterly predictions of resident-level econometric models over a 3-year period (1991-1994). Performance measures were tightly distributed among facilities in the state. The intercorrelations among the nine outcome performance measures were relatively low and not uniformly positive. Performance measures were not highly associated with various structural facility attributes. For most outcomes, longitudinal analyses revealed only modest correlations between a facility's performance score from one time period to the next. Relatively few facilities exhibited consistent superior or inferior performance over time. The findings have implications toward the practical use of facility outcome performance measures for quality assurance and reimbursement purposes in the near future.

  18. United States housing, second quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    The U.S. housing market’s quarter two results were disap¬pointing compared with the first quarter. Although overall expected gains did not materialize, certain sectors improved slightly. Housing under construction, completions, and new and existing home sales exhibited slight increases. Overall permit data declined, and the decrease in starts was due primarily to a...

  19. United States housing, fourth quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarter’s end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...

  20. 1. CARRIAGE HOUSE (left) AND SLAVE QUARTERS, SOUTH FRONT. A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CARRIAGE HOUSE (left) AND SLAVE QUARTERS, SOUTH FRONT. A kitchen was included in the quarters. - Charles Fraser House, Carriage House & Slave Quarters, 55 King Street, Charleston, Charleston County, SC

  1. Electric Power Quarterly, October-December 1985. [Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-05-05

    The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. Data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  2. Viability of bovine demi- and quarter-embryos after transfer.

    PubMed

    Bredbacka, P; Huhtinen, M; Aalto, J; Rainio, V

    1992-07-01

    The viability of bovine demi- and quarter-embryos was investigated. Early compacting morulae were nonsurgically flushed from superovulated donor cows and were bisected by two microneedles. One of the halves was then split further into two quarters. Each demi- and quarter-embryo was placed in an evacuated zona pellucida. One demi- or two quarter-embryos were transferred non-surgically into cow or heifer recipients. Viability was measured by ultrasound scanning of the fetuses on Days 35, 48 and 60 of pregnancy. The pregnancy rates at Day 60 were 46.2% (6/13) for heifers and 33.3% (4/12) for cows after the transfer of a single demi-embryo. The transfer of two quarter-embryos resulted in a pregnancy rate of 61.5% (8/13) for heifers and 8.3% (1/12) for cows. Seven (53.8%) and four (33.3%) live fetuses were found on Day 60 following the transfer of demi-embryos into heifers and cows, respectively. The transfer of quarter-embryos resulted in 10 fetuses (38.5%) in the heifer recipients and only one fetus (4.2%) in the cow recipients. The results of this study suggest that heifers are more suitable than cows as recipients for quarter-embryos.

  3. ARM Climate Research Facility Quarterly Value-Added Product Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sivaraman, C.

    The purpose of this report is to provide a concise status update for Value-Added Products (VAPs) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun; (2) progress on existing VAPs; (3) future VAPs that have been recently approved; (4) other work that leads to a VAP; (5) top requested VAPs from the ARM Data Archive; and (6) a summary of VAP and data releases to production and evaluation. New information is highlighted in blue text. New information about processed data by the developermore » is highlighted in red text. The upcoming milestones and dates are highlighted in green.« less

  4. Applied Meteorology Unit (AMU) Quarterly Report First Quarter FY-04

    NASA Technical Reports Server (NTRS)

    Bauman, William; Wheeler, Mark; Labert, Winifred; Jonathan Case; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the First Quarter of Fiscal Year 2004 (October - December 2003). Tasks reviewed are: (1) Objective Lightning Probability Forecast, (2) Mesonet Temperature and Wind Climatology, (3) Severe Weather Forecast Decision Aid and (4) Anvil Transparency Relationship to Radar Reflectivity

  5. Some boundary-value problems for anisotropic quarter plane

    NASA Astrophysics Data System (ADS)

    Arkhypenko, K. M.; Kryvyi, O. F.

    2018-04-01

    To solve the mixed boundary-value problems of the anisotropic elasticity for the anisotropic quarter plane, a method based on the use of the space of generalized functions {\\Im }{\\prime }({\\text{R}}+2) with slow growth properties was developed. The two-dimensional integral Fourier transform was used to construct the system of fundamental solutions for the anisotropic quarter plane in this space and a system of eight boundary integral relations was obtained, which allows one to reduce the mixed boundary-value problems for the anisotropic quarter plane directly to systems of singular integral equations with fixed singularities. The exact solutions of these systems were found by using the integral Mellin transform. The asymptotic behavior of solutions was investigated at the vertex of the quarter plane.

  6. Idaho National Laboratory Quarterly Performance Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth

    2014-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INLmore » from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.« less

  7. Implementation of patient charges at primary care facilities in Kenya: implications of low adherence to user fee policy for users and facility revenue

    PubMed Central

    Opwora, Antony; Waweru, Evelyn; Toda, Mitsuru; Noor, Abdisalan; Edwards, Tansy; Fegan, Greg; Molyneux, Sassy; Goodman, Catherine

    2015-01-01

    With user fees now seen as a major hindrance to universal health coverage, many countries have introduced fee reduction or elimination policies, but there is growing evidence that adherence to reduced fees is often highly imperfect. In 2004, Kenya adopted a reduced and uniform user fee policy providing fee exemptions to many groups. We present data on user fee implementation, revenue and expenditure from a nationally representative survey of Kenyan primary health facilities. Data were collected from 248 randomly selected public health centres and dispensaries in 2010, comprising an interview with the health worker in charge, exit interviews with curative outpatients, and a financial record review. Adherence to user fee policy was assessed for eight tracer conditions based on health worker reports, and patients were asked about actual amounts paid. No facilities adhered fully to the user fee policy across all eight tracers, with adherence ranging from 62.2% for an adult with tuberculosis to 4.2% for an adult with malaria. Three quarters of exit interviewees had paid some fees, with a median payment of US dollars (USD) 0.39, and a quarter of interviewees were required to purchase additional medical supplies at a later stage from a private drug retailer. No consistent pattern of association was identified between facility characteristics and policy adherence. User fee revenues accounted for almost all facility cash income, with average revenue of USD 683 per facility per year. Fee revenue was mainly used to cover support staff, non-drug supplies and travel allowances. Adherence to user fee policy was very low, leading to concerns about the impact on access and the financial burden on households. However, the potential to ensure adherence was constrained by the facilities’ need for revenue to cover basic operating costs, highlighting the need for alternative funding strategies for peripheral health facilities. PMID:24837638

  8. Defense Attache Saigon: RVNAF Quarterly Assessment, 1st Quarter FY75

    DTIC Science & Technology

    1974-11-01

    CONFIDENTIAL ___ has been realized and a new computation of requirements methodology has been developed. Improved repair capability at ATLC and the Air ... Asia Ccrtcactor (Taiwan) have also reduced the dollar value "of AIMI buy requirements from CONUS. Comparison of quarterly * requirements follows

  9. 1. GENERAL VIEW OF SLAVE QUARTERS No. 2 (right). Located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF SLAVE QUARTERS No. 2 (right). Located north of main house. The building at left is Slave Quarters No. 1 (HABS No. VA-1233 C) - Westend, Slave Quarters No. 2, Route 638 vicinity, Trevilians, Louisa County, VA

  10. Crew quarters for Space Station

    NASA Technical Reports Server (NTRS)

    Mount, F. E.

    1989-01-01

    The only long-term U.S. manned space mission completed has been Skylab, which has similarities as well as differences to the proposed Space Station. With the exception of Skylab missions, there has been a dearth of experience on which to base the design of the individual Space Station Freedom crew quarters. Shuttle missions commonly do not have sleep compartments, only 'sleeping arrangements'. There are provisions made for each crewmember to have a sleep restraint and a sleep liner, which are attached to a bulkhead or a locker. When the Shuttle flights began to have more than one working shift, crew quarters became necessary due to noise and other disturbances caused by crew task-related activities. Shuttle missions that have planned work shifts have incorporated sleep compartments. To assist in gaining more information and insight for the design of the crew quarters for the Space Station Freedom, a survey was given to current crewmembers with flight experience. The results from this survey were compiled and integrated with information from the literature covering space experience, privacy, and human-factors issues.

  11. Washington Community Colleges Fall Quarter Report, 1980.

    ERIC Educational Resources Information Center

    Story, Sherie; And Others

    This three-part report presents a series of 46 tables providing data about enrollments, student characteristics, and personnel in the Washington community college system for Fall Quarter 1980. After a summary of the statistical highlights of the study, Chapter I offers historical data on Fall Quarter, full-time equivalent (FTE) and student…

  12. 77 FR 39447 - Revisions to Electric Quarterly Report Filing Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... Quarterly Report Filing Process AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Notice of... Rule which governs the filing of Electric Quarterly Reports (EQRs), to change the process for filing... Regulatory Commission (Commission) proposes changes to the method for filing Electric Quarterly Reports (EQRs...

  13. Trustee Quarterly, 1992.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1992

    1992-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1992 issue offers articles on the trustee's role in politics, community colleges as community catalysts, Lewis and Clark Community College's (Illinois) strategic planning process, staff development…

  14. Trustee Quarterly, 1995.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1995

    1995-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1995 issue offers these feature articles: "Trustees Believe Focus Should Be on Major Policy Decisions," (John F. Grabowski) and "A Cost-Benefit Analysis System for Proposed Capital…

  15. Trustee Quarterly, 1991.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1991

    1991-01-01

    These four issues of "Trustee Quarterly" focus on topics of current concern to community college trustees. The winter 1991 issue contains articles examining the trustee role in helping diverse students achieve, a reconceptualization of community college finance, the development of a statewide communications plan by the Washington trustees, an…

  16. FACILITY 72, INTERIOR. 15LIGHT DOUBLE DOORS WITH 15LIGHT SIDELIGHTS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 72, INTERIOR. 15-LIGHT DOUBLE DOORS WITH 15-LIGHT SIDELIGHTS AND 2-LIGHT TRANSOM. LIVING ROOM BEYOND. VIEW FACING NORTH-NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Senior Officers' Quarters Type C, North end of Makalapa Drive, Pearl City, Honolulu County, HI

  17. Career-Technical Education--The Immediate Need for Work-Based Curriculum.

    ERIC Educational Resources Information Center

    Nee, John G.

    1994-01-01

    Career-technical education may be informal on-the-job training, organized workplace education, community college or technical institute programs, or apprenticeships, internships, and cooperative agreements. Another alternative is polytechnical education: providing technical and general studies for adults in existing school facilities after school…

  18. Spiraling Light with Magnetic Metamaterial Quarter-Wave Turbines.

    PubMed

    Zeng, Jinwei; Luk, Ting S; Gao, Jie; Yang, Xiaodong

    2017-09-19

    Miniaturized quarter-wave plate devices empower spin to orbital angular momentum conversion and vector polarization formation, which serve as bridges connecting conventional optical beam and structured light. Enabling the manipulability of additional dimensions as the complex polarization and phase of light, quarter-wave plate devices are essential for exploring a plethora of applications based on orbital angular momentum or vector polarization, such as optical sensing, holography, and communication. Here we propose and demonstrate the magnetic metamaterial quarter-wave turbines at visible wavelength to produce radially and azimuthally polarized vector vortices from circularly polarized incident beam. The magnetic metamaterials function excellently as quarter-wave plates at single wavelength and maintain the quarter-wave phase retardation in broadband, while the turbine blades consist of multiple polar sections, each of which contains homogeneously oriented magnetic metamaterial gratings near azimuthal or radial directions to effectively convert circular polarization to linear polarization and induce phase shift under Pancharatnum-Berry's phase principle. The perspective concept of multiple polar sections of magnetic metamaterials can extend to other analogous designs in the strongly coupled nanostructures to accomplish many types of light phase-polarization manipulation and structured light conversion in the desired manner.

  19. Variations in hospitalization rates among nursing home residents: the role of facility and market attributes.

    PubMed

    Carter, Mary W; Porell, Frank W

    2003-04-01

    This study examined the contribution of facility-level and area market-level attributes to variations in hospitalization rates among nursing home residents. Three years (1991-1994) of state quarterly Medicaid case-mix reimbursement data from 527 nursing homes (NH) in Massachusetts were linked with Medicare Provider Analysis and Review hospital claims and nursing facility attribute data to produce a longitudinal, analytical file containing 72,319 person-quarter observations. Logistic regression models were used to estimate the influence of facility-level and market-level factors on hospital use, after controlling for individual-level resident attributes, including: NH diagnoses, resident-level quality of care indicators, and diagnostic cost grouping classification from previous hospital stays. Multivariate findings suggest that resident heterogeneity alone does not account for the wide variations in hospitalization rates across nursing homes. Instead, facility characteristics such as profit status, nurse staffing patterns, NH size, chain affiliation, and percentage of Medicaid and Medicare reimbursed days significantly influence NH residents' risk of hospitalization. Broader area market factors also appear to contribute to variations in hospitalization rates. Variations in hospitalization rates may reflect underutilization, as well as overutilization. Continued efforts toward identifying medically necessary hospitalizations are needed.

  20. First Quarter Hanford Seismic Report for Fiscal Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.

    2010-03-29

    The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b,more » 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite

  1. Seismic assessment of Technical Area V (TA-V).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Medrano, Carlos S.

    The Technical Area V (TA-V) Seismic Assessment Report was commissioned as part of Sandia National Laboratories (SNL) Self Assessment Requirement per DOE O 414.1, Quality Assurance, for seismic impact on existing facilities at Technical Area-V (TA-V). SNL TA-V facilities are located on an existing Uniform Building Code (UBC) Seismic Zone IIB Site within the physical boundary of the Kirtland Air Force Base (KAFB). The document delineates a summary of the existing facilities with their safety-significant structure, system and components, identifies DOE Guidance, conceptual framework, past assessments and the present Geological and Seismic conditions. Building upon the past information and themore » evolution of the new seismic design criteria, the document discusses the potential impact of the new standards and provides recommendations based upon the current International Building Code (IBC) per DOE O 420.1B, Facility Safety and DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Non-Nuclear Facilities.« less

  2. Trustee Quarterly, 1993.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1993

    1993-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1993 issue offers articles on the prospects for educational reform under the Clinton administration and the current Congress, strategies for obtaining needed resources from the state legislature, and the…

  3. Trustee Quarterly, 1997.

    ERIC Educational Resources Information Center

    Hutchins, Sally, Ed.

    1997-01-01

    These four issues of "Trustee Quarterly" focus on current topics affecting community college trustees. Issue 1 focuses on the learning revolution and serves as a guide for community college trustees. It offers the following feature articles by Terry O'Banion: "Education Reform: Two Waves,""The Second Wave and the Community…

  4. Trustee Quarterly, 1994.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1994

    1994-01-01

    The four issues of "Trustee Quarterly" combined here focus on topics of current concern to community college trustees. The winter 1994 issues offers these feature articles: "Honoring Retiring Presidents," by Terry O'Banion; "Trustees as Reluctant Leaders: The Board/CEO Relationship," Norma Jean Germond, John Keyser, and Vaughn A. Sherman; and…

  5. H-Area Seepage Basins groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    During fourth quarter 1992, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with South Carolina Hazardous Waste Management Regulations, R61-79.265, Subpart F. Samples were collected from 130 wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B Post-Closure Care Permit Application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control in December 1990. Historically, as well as currently, tritium, nitrate, total alpha-emittingmore » radium, gross alpha, and mercury have been the primary constituents observed above final Primary Drinking Water Standards (PDWS) in groundwater at the HASB. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during first and fourth quarter 1992. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.« less

  6. NCEL (Naval Civil Engineering Laboratory) Quarterly Abstracts of Technical Documents, 1 April to 30 June 1987.

    DTIC Science & Technology

    1987-06-30

    release; distribution unlimited. 87 8 3075 TABLE OF CONTENTS page TECHNICAL NOTES N-1764 Validation of Nitronic 33 in Reinforced and Prestressed...TECHNICAL WES K- 1764 Validation of Nitrovic 33 In Reeinforced and Prestressed Concrete, Apr 1987, James F. Jenkins (public release) Nitronic 33...prestressing strand are not acceptable. Before Nitronic 33 stainless steel prestressed concrete waterfront structures were constructed, it was necessary to

  7. Implementation of patient charges at primary care facilities in Kenya: implications of low adherence to user fee policy for users and facility revenue.

    PubMed

    Opwora, Antony; Waweru, Evelyn; Toda, Mitsuru; Noor, Abdisalan; Edwards, Tansy; Fegan, Greg; Molyneux, Sassy; Goodman, Catherine

    2015-05-01

    With user fees now seen as a major hindrance to universal health coverage, many countries have introduced fee reduction or elimination policies, but there is growing evidence that adherence to reduced fees is often highly imperfect. In 2004, Kenya adopted a reduced and uniform user fee policy providing fee exemptions to many groups. We present data on user fee implementation, revenue and expenditure from a nationally representative survey of Kenyan primary health facilities. Data were collected from 248 randomly selected public health centres and dispensaries in 2010, comprising an interview with the health worker in charge, exit interviews with curative outpatients, and a financial record review. Adherence to user fee policy was assessed for eight tracer conditions based on health worker reports, and patients were asked about actual amounts paid. No facilities adhered fully to the user fee policy across all eight tracers, with adherence ranging from 62.2% for an adult with tuberculosis to 4.2% for an adult with malaria. Three quarters of exit interviewees had paid some fees, with a median payment of US dollars (USD) 0.39, and a quarter of interviewees were required to purchase additional medical supplies at a later stage from a private drug retailer. No consistent pattern of association was identified between facility characteristics and policy adherence. User fee revenues accounted for almost all facility cash income, with average revenue of USD 683 per facility per year. Fee revenue was mainly used to cover support staff, non-drug supplies and travel allowances. Adherence to user fee policy was very low, leading to concerns about the impact on access and the financial burden on households. However, the potential to ensure adherence was constrained by the facilities' need for revenue to cover basic operating costs, highlighting the need for alternative funding strategies for peripheral health facilities. Published by Oxford University Press in association with

  8. Life Sciences Centrifuge Facility assessment

    NASA Technical Reports Server (NTRS)

    Benson, Robert H.

    1994-01-01

    This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.

  9. NIST Document Sharing Test Facility

    Science.gov Websites

    NIST Document Sharing Test Facility This site supports the IHE effort in Document Sharing as part . This test facility is based on the IHE IT Infrastructure Technical Framework. All testing done against that Patient IDs be pre-registered before submitting metadata about them. To allocate new patient IDs

  10. NASA Technical Standards Program and Implications for Lessons Learned and Technical Standard Integration

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The National Aeronautics and Space Agency consists of fourteen Facilities throughout the United States. They are organized to support the Agency's principal Enterprises: (1) Space Science, (2) Earth Science, (3) Aerospace Technology, (4) Human Exploration and Development of Space, and (5) Biological and Physical Research. Technical Standards are important to the activities of each Enterprise and have been an integral part in the development and operation of NASA Programs and Projects since the Agency was established in 1959. However, for years each Center was responsible for its own standards development and selection of non-NASA technical standards that met the needs of Programs and Projects for which they were responsible. There were few Agencywide applicable Technical Standards, mainly those in area of safety. Department of Defense Standards and Specifications were the foundation and main source for Technical Standards used by the Agency. This process existed until about 1997 when NASA embarked on a Program to convert NASA's Center-developed Technical Standards into Agencywide endorsed NASA Preferred Technical Standards. In addition, action was taken regarding the formal adoption of non-NASA Technical Standards (DOD, SAE, ASTM, ASME, IEEE, etc.) as NASA Preferred Technical Standards.

  11. 75 FR 17462 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... decision may be purchased by contacting the office of Public Assistance, Governmental Affairs, and...-2)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2010 Rail Cost...

  12. Environmental Hazards Assessment Program. Quarterly report, July--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report describes activities and reports on progress for the first quarter (July--September) of the fourth year of the grant to support the Environmental Hazards Assessment Program (EHAP) at the Medical University of South Carolina. It reports progress against the grant objectives and the Program Implementation Plan published at the end of the first year of the grant. The objectives of EHAP stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2)more » develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management.« less

  13. 76 FR 59483 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... the decision may be purchased by contacting the Office of Public Assistance, Governmental Affairs, and...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2011 Rail Cost Adjustment...

  14. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  15. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  16. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  17. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  18. 32 CFR 2001.51 - Technical security.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Surveillance Countermeasures and TEMPEST necessary to detect or deter exploitation of classified information..., TEMPEST Countermeasures for Facilities, and SPB Issuance 6-97, National Policy on Technical Surveillance...

  19. 32 CFR 2001.51 - Technical security.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Surveillance Countermeasures and TEMPEST necessary to detect or deter exploitation of classified information..., TEMPEST Countermeasures for Facilities, and SPB Issuance 6-97, National Policy on Technical Surveillance...

  20. 32 CFR 2001.51 - Technical security.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Surveillance Countermeasures and TEMPEST necessary to detect or deter exploitation of classified information..., TEMPEST Countermeasures for Facilities, and SPB Issuance 6-97, National Policy on Technical Surveillance...

  1. 32 CFR 2001.51 - Technical security.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Surveillance Countermeasures and TEMPEST necessary to detect or deter exploitation of classified information..., TEMPEST Countermeasures for Facilities, and SPB Issuance 6-97, National Policy on Technical Surveillance...

  2. 32 CFR 2001.51 - Technical security.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Surveillance Countermeasures and TEMPEST necessary to detect or deter exploitation of classified information..., TEMPEST Countermeasures for Facilities, and SPB Issuance 6-97, National Policy on Technical Surveillance...

  3. Pathogen group specific risk factors for clinical mastitis, intramammary infection and blind quarters at the herd, cow and quarter level in smallholder dairy farms in Jimma, Ethiopia.

    PubMed

    Tolosa, T; Verbeke, J; Ayana, Z; Piepers, S; Supré, K; De Vliegher, S

    2015-07-01

    A cross-sectional study on clinical mastitis, intramammary infection (IMI) and blind quarters was conducted on 50 smallholder dairy farms in Jimma, Ethiopia. A questionnaire was performed, and quarters of 211 cows were sampled and bacteriologically cultured. Risk factors at the herd, cow, and quarter level for clinical mastitis and (pathogen-specific) intramammary infection were studied using multilevel modeling. As well, factors associated with quarters being blind were studied. Eleven percent of the cows and 4% of the quarters had clinical mastitis whereas 85% of the cows and 51% of the quarters were infected. Eighteen percent of the cows had one or more blind quarter(s), whereas 6% of the quarters was blind. Non-aureus staphylococci were the most frequently isolated pathogens in both clinical mastitis cases and IMI. The odds of clinical mastitis was lower in herds where heifers were purchased in the last year [odds ratio (OR) with 95% confidence interval: 0.11 (0.01-0.90)], old cows (>4 years) [OR: 0.45 (0.18-1.14)], and quarters not showing teat injury [OR: 0.23 (0.07-0.77)]. The odds of IMI caused by any pathogen was higher in herds not practicing teat drying before milking (opposed to drying teats with 1 towel per cow) [OR: 1.68 (1.05-2.69)], cows in later lactation (>180 DIM opposed to ≤90 DIM) [OR: 1.81 (1.14-2.88)], cows with a high (>3) body condition score (BCS) [OR: 1.57 (1.06-2.31)], right quarters (opposed to a left quarter position) [OR: 1.47 (1.10-1.98)], and quarters showing teat injury [OR: 2.30 (0.97-5.43)]. Quarters of cows in herds practicing bucket-fed calf feeding (opposed to suckling) had higher odds of IMI caused by Staphylococcus aureus [OR: 6.05 (1.31-27.90)]. Except for BCS, IMI caused by non-aureus staphylococci was associated with the same risk factors as IMI caused by any pathogen. No access to feed and water immediately after milking [OR: 2.41 (1.26-4.60)], higher parity [OR: 3.60 (1.20-10.82)] and tick infestation [OR: 2.42 (1

  4. KSC Technical Capabilities Website

    NASA Technical Reports Server (NTRS)

    Nufer, Brian; Bursian, Henry; Brown, Laurette L.

    2010-01-01

    This document is the website pages that review the technical capabilities that the Kennedy Space Center (KSC) has for partnership opportunities. The purpose of this information is to make prospective customers aware of the capabilities and provide an opportunity to form relationships with the experts at KSC. The technical capabilities fall into these areas: (1) Ground Operations and Processing Services, (2) Design and Analysis Solutions, (3) Command and Control Systems / Services, (4) Materials and Processes, (5) Research and Technology Development and (6) Laboratories, Shops and Test Facilities.

  5. Notable deals in the pharmaceutical industry in the first quarter of 2017.

    PubMed

    Cruces, E

    2017-06-01

    During the first quarter of 2017, Cortellis Competitive Intelligence had 1,073 new deals added as part of its ongoing coverage of pharmaceutical licensing activity. This meant a slight increase on the last quarter (1,022) and a similar volume on the same quarter for the previous 1 year (1,141). However, this quarter showed a significant augment in deals worth more than USD 0.5 billion on the last quarter (17 vs. 12). This article will focus on highlighting a number of the most valuable and notable deals forged during the quarter, as well as a selection of deals from some of the most prolific deal makers. An update on milestone, options and terminated deals of significance will also be presented, along with an early outlook on the next quarter's pharmaceutical licensing activity.

  6. Results for the First, Second, and Third Quarter Calendar Year 2015 Tank 50H WAC slurry samples chemical and radionuclide contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2016-02-18

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2015 First, Second, and Third Quarter sampling of Tank 50H for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering (D&S-FE) to support the transfer of low-level aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50H Waste Characterization System. Previous memorandamore » documenting the WAC analyses results have been issued for these three samples.« less

  7. 77 FR 37958 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2012 rail cost adjustment...

  8. 75 FR 35877 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... available on our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting...-3)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2010 rail cost...

  9. 75 FR 58019 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2010 Rail Cost Adjustment...

  10. 75 FR 80895 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2011 Rail Cost Adjustment...

  11. 76 FR 16037 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2011 Rail Cost Adjustment...

  12. 78 FR 37660 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board approves the third quarter 2013 Rail Cost Adjustment Factor...

  13. 76 FR 37191 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2011 Rail Cost Adjustment...

  14. 78 FR 17764 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2013 Rail Cost Adjustment...

  15. Aeronautical Facilities Catalogue. Volume 1: Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Penaranda, F. E. (Compiler); Freda, M. S. (Compiler)

    1985-01-01

    Domestic and foreign wind tunnel facilities are enumerated and their technical parameters are described. Data pertinent to managers and engineers are presented. Facilities judged comparable in testing capability are noted and grouped together. Several comprehensive cross-indexes and charts are included.

  16. Electric power quarterly October--December 1988: Final issue

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The Electric Power Quarterly (EPQ) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA). The EPQ presents information on electric utilities at the national, division, State, company, and plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience, including Congress, Federal, and State agencies; industry; and the general public.more » The data presented in this report were collected and published by the EPA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This edition of the EPQ contains monthly data for the fourth quarter of 1988. 10 refs., 1 fig., 15 tabs.« less

  17. US energy industry financial developments, 1993 first quarter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-25

    Net income for 259 energy companies-- including, 20 major US petroleum companies-- rose 38 percent between the first quarter of 1992 and the first quarter of 1993. An increased level of economic activity, along with colder weather, helped lift the demand for natural gas. crude oil, coal, and electricity. The sharp rise in the domestic price of natural gas at the wellhead relative to the year-ago quarter was the most significant development in US energy during the first quarter. As a consequence of higher natural gas prices, the upstream segment of the petroleum industry reported large gains in income, whilemore » downstream income rose due to higher refined product demand. Increased economic activity and higher weather-related natural gas demand also led to improvements in income for the rate-regulated energy segment. However, declining domestic oil production continued to restrain upstream petroleum industry earnings growth, despite a moderate rise in crude oil prices.« less

  18. NREL Partners with Technical University of Denmark on Renewable Energy

    Science.gov Websites

    System | Energy Systems Integration Facility | NREL Technical University of Denmark NREL Partners with Technical University of Denmark on Renewable Energy System NREL is working in partnership with the Technical University of Denmark for the Centre for IT-Intelligent Energy Systems in Cities

  19. Photographic copy of floor plans for Bachelor Officers' Quarters (Tl) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plans for Bachelor Officers' Quarters (T-l) known as the "Desert Rat Hotel" in the early days of the Muroc Flight Test Base (North Base). The plans show the layout of quarters, lavatories, mess as well as, the cooling system installation. Contract W-509-Eng 2937, Military Construction; Muroc Bombing Range, Muroc Lake, Calif; Materiel Test Site, Officers Quarters, Evaporative Coolers, Sheet 5 of 11, May 1942. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Bachelor Officers' Quarters T-1, Second & C Streets, Boron, Kern County, CA

  20. WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION. - Naval Magazine Lualualei, Headquarters Branch, Warrant Officer's & Civilians Quarters Type, Along Sixty-sixth Street between Amberjack & Constitution Streets, Pearl City, Honolulu County, HI

  1. 12 CFR 620.10 - Preparing the quarterly report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Preparing the quarterly report. 620.10 Section 620.10 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DISCLOSURE TO SHAREHOLDERS... must: (1) Prepare and send, to the Farm Credit Administration, an electronic copy of its quarterly...

  2. 76 FR 80448 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2012 rail cost adjustment factor (RCAF... decision, which is available on our Web site, http://www.stb.dot.gov . Copies of the decision may be...

  3. 77 FR 58910 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2012 rail cost adjustment factor (RCAF...

  4. Adjustment Notes for Apprentice and Trainee Estimates: December Quarter 2014. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to National Centre for Vocational Education Research (NCVER) on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred…

  5. FAST FLUX TEST FACILITY CONCEPTUAL FACILTY DESIGN DESCRIPTION FOR THE INERT GAS CELL EXAMINATION FACILITY NO. 71

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1968-12-12

    The purpose of this Conceptual Facility Design Description (CFDD) is to provide a technical description of the Inert Gas Cell Examination Facility such that agreement with RDT on a Conceptual Design can be reached . The CFDD also serves to establish a common understanding of the facility concept among all responsible FFTF Project parties including the Architect Engineer and Reactor Designer. Included are functions and design requirements, a physical description of the facility, safety considerations, principles of operation, and maintenance principles.

  6. Apprentices & Trainees: Early Trend Estimates. December Quarter, 2014

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    This publication presents early estimates of apprentice and trainee commencements for the December quarter 2014. Indicative information about this quarter is presented here; the most recent figures are estimated, taking into account reporting lags that occur at the time of data collection. The early trend estimates are derived from the National…

  7. Apprentices & Trainees: Early Trend Estimates. March Quarter, 2012

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2012

    2012-01-01

    This publication presents early estimates of apprentice and trainee commencements for the March quarter 2012. Indicative information about this quarter is presented here; the most recent figures are estimated, taking into account reporting lags that occur at the time of data collection. The early trend estimates are derived from the National…

  8. 12 CFR 620.10 - Preparing the quarterly report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 620.10 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DISCLOSURE TO SHAREHOLDERS... must: (1) Prepare and send, to the Farm Credit Administration, an electronic copy of its quarterly...) Publish a copy of its quarterly report on its Web site when it electronically sends the report to the Farm...

  9. Adjustment Notes for Apprentice and Trainee Estimates: December Quarter 2016. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2017

    2017-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to NCVER on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred to as Collection 2, Collection 3 and so on. NCVER…

  10. Adjustment Notes for Apprentice and Trainee Estimates: September Quarter 2016. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2017

    2017-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to NCVER on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred to as Collection 2, Collection 3 and so on. NCVER…

  11. Numerical Facilities: A Review of the Literature. Technical Report 1985-3.

    ERIC Educational Resources Information Center

    Tal, Joseph S.

    This review of the relevant literature in the area of numerical facility attempts to clarify the construct of numerical facility and provide guidance for items tapping this ability. The review is presented in five parts. The first section introduces two approaches that can be used to investigate numerical facility, including factor analysis.…

  12. NUSC Technical Publications Guide.

    DTIC Science & Technology

    1985-05-01

    Facility personnel especially that of A. Castelluzzo, E. Deland, J. Gesel , and E. Szlosek (all of Code 4343). Reviewed and Approved: 14 July 1980 D...their technical content and format. Review and approve the manual outline, the review manuscript, and the final camera - reproducible copy. Conduct in

  13. Environmental effects of dredging. Documentation of the settle module for ADDAMS: Design of confined disposal facilities for solids retention and initial storage. Technical notes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hayes, D.F.; Schroeder, P.R.

    This technical note documents the SETTLE computer program which facilitates the design of a confined disposal facility (CDF) to retain solids, provide initial storage, and meet effluent discharge limitations for suspended solids during a dredged matenal disposal operation. Detailed information can be found in Engineer Manual 1110-2-5027, Confined Dredged Material Disposal. SETTLE is a part of the Automated Dredging and Disposal Alternatives Management System (ADDAMS).

  14. An integrated analytical framework for quantifying the LCOE of waste-to-energy facilities for a range of greenhouse gas emissions policy and technical factors.

    PubMed

    Townsend, Aaron K; Webber, Michael E

    2012-07-01

    This study presents a novel integrated method for considering the economics of waste-to-energy (WTE) facilities with priced greenhouse gas (GHG) emissions based upon technical and economic characteristics of the WTE facility, MSW stream, landfill alternative, and GHG emissions policy. The study demonstrates use of the formulation for six different policy scenarios and explores sensitivity of the results to ranges of certain technical parameters as found in existing literature. The study shows that details of the GHG emissions regulations have large impact on the levelized cost of energy (LCOE) of WTE and that GHG regulations can either increase or decrease the LCOE of WTE depending on policy choices regarding biogenic fractions from combusted waste and emissions from landfills. Important policy considerations are the fraction of the carbon emissions that are priced (i.e. all emissions versus only non-biogenic emissions), whether emissions credits are allowed due to reducing fugitive landfill gas emissions, whether biogenic carbon sequestration in landfills is credited against landfill emissions, and the effectiveness of the landfill gas recovery system where waste would otherwise have been buried. The default landfill gas recovery system effectiveness assumed by much of the industry yields GHG offsets that are very close to the direct non-biogenic GHG emissions from a WTE facility, meaning that small changes in the recovery effectiveness cause relatively larger changes in the emissions factor of the WTE facility. Finally, the economics of WTE are dependent on the MSW stream composition, with paper and wood being advantageous, metal and glass being disadvantageous, and plastics, food, and yard waste being either advantageous or disadvantageous depending upon the avoided tipping fee and the GHG emissions price. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Astronomic Telescope Facility: Preliminary systems definition study report. Volume 2: Technical description

    NASA Technical Reports Server (NTRS)

    Sobeck, Charlie (Editor)

    1987-01-01

    The Astrometric Telescope Facility (AFT) is to be an earth-orbiting facility designed specifically to measure the change in relative position of stars. The primary science investigation for the facility will be the search for planets and planetary systems outside the solar system. In addition the facility will support astrophysics investigations dealing with the location or motions of stars. The science objective and facility capabilities for astrophysics investigations are discussed.

  16. RETROFITTING CONTROL FACILITIES FOR WET-WEATHER FLOW TREATMENT

    EPA Science Inventory

    Available technologies were evaluated to demonstrate the technical feasibility and cost effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilities...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Areamore » [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.« less

  18. RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOZLOWSKI, S.D.

    2007-05-30

    This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditionsmore » for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below.« less

  19. Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-04

    NASA Technical Reports Server (NTRS)

    Bauman, William; Wheeler, Mark; Lambert, Winifred; Case, Jonathan; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (A MU) activities for the fourth quarter of Fiscal Year 2004 (July -Sept 2004). Tasks covered are: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Shuttle Ascent Camera Cloud Obstruction Forecast, (5) Advanced Regional Prediction System (ARPS) Optimization and Training Extension and (5) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest.

  20. [Alcohol and drug misuse of the elderly in health care facilities].

    PubMed

    Kuhn, S; Haasen, C

    2012-05-01

    A nationwide representative survey was conducted in residential care facilities and facilities offering care for the elderly in their homes (home care facilities) with the aim to estimate the rate of alcohol and drug misuse among this population and to evaluate the way in which nursing staff deal with the problem. A total of 5000 randomly selected facilities were contacted with a 2-page questionnaire. Reliable data were obtained from 550 residential care facilities and from 436 home care facilities. According to the investigated facilities, the mean rate of misuse among the elderly was 14%. Nearly all facilities acknowledge the necessity to react to these facts, but only a quarter of them considered their staff to be sufficiently trained. 38.4% of the residential care facilities and 26.9% of the home care facilities have a concept on how to react to misuse problems. Addiction services are rarely contacted. The prevalence of alcohol and drug misuse among the elderly in health care facilities is high compared to the same age cohort of the total population. The lack of networking between facilities for the elderly and addiction services is remarkable. © Georg Thieme Verlag KG Stuttgart · New York.

  1. Coleman in sleeping quarters

    NASA Image and Video Library

    2010-12-25

    ISS026-E-012158 (25 Dec. 2010) --- NASA astronaut Catherine (Cady) Coleman, Expedition 26 flight engineer, and one of six crew members currently aboard the International Space Station, peeks out of her sleeping quarters on Christmas morning to view the station’s decorations and gifts.

  2. English Leadership Quarterly, 1992.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1992-01-01

    These four issues of the English Leadership Quarterly represent those published during 1992. Articles in number 1 deal with testing assessing, and measuring student performance, and include: "Real Evaluation: Portfolios as an Effective Alternative to Standardized Testing" (Kate Kiefer); "No More Objective Tests, Ever" (Carol…

  3. English Leadership Quarterly, 1993.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1993-01-01

    These four issues of the English Leadership Quarterly represent those published during 1993. Articles in number 1 deal with parent involvement and participation, and include: "Opening the Doors to Open House" (Jolene A. Borgese); "Parent/Teacher Conferences: Avoiding the Collision Course" (Robert Perrin); "Expanding Human…

  4. 77 FR 38211 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY..., the Federal Motor Carrier Safety Administration (FMCSA) eliminates the quarterly financial reporting... would be ineffective or unacceptable without a change. III. Background Annual Financial Reporting...

  5. 78 FR 31475 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY...); request for comments. SUMMARY: FMCSA proposes to eliminate the quarterly financial reporting requirements... person argued that the financial reporting requirements transferred from the Interstate Commerce...

  6. Technical solutions to overcrowded park and ride facilities

    DOT National Transportation Integrated Search

    2007-05-01

    This report presents the results on potential techniques to more efficiently utilize existing park and ride : technologies and plan for future changes to the park and ride facilities. It presents: : A summary of parking monitoring and parking guidanc...

  7. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...

  8. General view of Quarters (Building No. 44) and Lake Jeanette ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view of Quarters (Building No. 44) and Lake Jeanette looking southeast. - National Home for Disabled Volunteer Soldiers, Western Branch, Quarters, Franklin Avenue, Leavenworth, Leavenworth County, KS

  9. 14. INTERIOR OF TYPICAL SLEEPING QUARTERS, BUILDING 208, LOOKING SOUTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR OF TYPICAL SLEEPING QUARTERS, BUILDING 208, LOOKING SOUTHEAST. - Mill Valley Air Force Station, Bachelor Airmen Quarters, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA

  10. Gifted Education Quarterly, 1998.

    ERIC Educational Resources Information Center

    Fisher, Maurice, Ed.

    1998-01-01

    These four issues of "Gifted Education Quarterly" include the following articles: (1) "Using Test Results To Support Clinical Judgment" (Linda Kreger Silverman), which discusses some of the difficulties in obtaining accurate indications of a child's level of giftedness and the importance of using professional judgment in…

  11. Nuclear Waste: Defense Waste Processing Facility-Cost, Schedule, and Technical Issues.

    DTIC Science & Technology

    1992-06-17

    gallons of high-level radioactive waste stored in underground tanks at the savannah major facility involved Is the Defense Waste Processing Facility ( DwPF ...As a result of concerns about potential problems with the DWPF and delays in its scheduled start-up, the Chairman of the Environment, Energy, and...Natural Resources Subcommittee, House Committee on Government Operations, asked GAO to review the status of the DWPF and other facilities. This report

  12. Natural gas imports and exports. Fourth quarter report, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during themore » past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.« less

  13. Natural gas imports and exports. First quarter report, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the first quarter of 1998 (January through March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during themore » past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.« less

  14. Joint Force Quarterly. Issue 62, 3rd Quarter, July 2011

    DTIC Science & Technology

    2011-07-01

    academic publishing house. It publishes books, journals, policy briefs, occasional papers , monographs, and special reports on national security strategy...to the link on the NDU Press Web site or write to: Editor, Joint Force Quarterly National Defense University Press 260 Fifth Avenue, S.W. (Building...military professionalism and has made them available on its Web site.1 INSEL is in the process of posting on its Web site a video of all the conference

  15. Reader-Centered Technical Writing

    NASA Astrophysics Data System (ADS)

    Narayanan, M.

    2012-12-01

    an old schema. This reinforces basic engineering and mathematical design concepts. Accommodation: Here, it may work in a different manner. Writers may have to accommodate an old schema to a new object. This helps engineers to focus more on applications. Adaptation: Assimilation and accommodation are the two sides of adaptation, Jean Piaget's term for what most of us would call learning. Mathematical design concepts generated by students should be suitable for creative engineering applications. References : Phillips, D. C. and Soltis, Jonas F. (2003) "Piagetian Structures and Psychological Constructivism," in Perspectives on Learning (4th edition). New York: Teachers College Press. Salvo, Michael J. (2001). Ethics of Engagement: User-Centered Design and Rhetorical Methodology. Technical Communication Quarterly Volume 10, Issue 3, 2001. pages 273-290. http://www.ship.edu/~cgboeree/piaget.html http://owl.english.purdue.edu/owl/resource/624/01/

  16. Notable licensing deals in the biopharma industry in the second quarter of 2017.

    PubMed

    D'Souza, P

    2017-08-01

    During the second quarter of 2017, Cortellis Competitive Intelligence added 967 new licensing deals (excluding mergers and acquisition deals) as part of its ongoing coverage of pharmaceutical licensing activity. This meant an 8% decrease on the previous quarter (1,050) and a 3% decrease from the same quarter in 2016 (993). This quarter also showed a significant decline in the number of deals worth more than USD 0.5 billion from the last quarter (7 vs. 17). This article will highlight a number of the most valuable and notable deals forged during the quarter, as well as a selection of deals from some of the most prolific deal makers in the life sciences. An update on milestone, options and terminated deals of significance will also be presented, along with an early outlook on the next quarter's pharmaceutical licensing activity.

  17. 2. EAST SIDE OF SLAVE QUARTERS (Jack E. Boucher, photgrapher, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EAST SIDE OF SLAVE QUARTERS (Jack E. Boucher, photgrapher, April/May, 1986) - Felix & Odile Pratt Valle Slave Quarters, Southeast corner of Merchant & Second Streets, Sainte Genevieve, Ste. Genevieve County, MO

  18. Standard Engineering Installation Package, Technical Control Facility, Technical Control Improvement Program (TCIP)

    DTIC Science & Technology

    1979-10-01

    software. This document may not be cited for purpose of advertisement . AVAILABILITY This publication is available to non-Government agencies and may be...voltage interface requirements for repeaters. This supply occupies one slot in the 10306 mounting shelf. 1.4.2.8.5 Teletypewriter monitor. The AN/ UGC -61X...The AN/ UGC -61X keyboard send-receive (KSR) TTY set is an electromechanical apparatus that provides terminal facilities with two receive only, one KSR

  19. Nuclear facility decommissioning and site remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.« less

  20. A Second Follow-Up Year for "Measuring How Benchmark Assessments Affect Student Achievement." REL Technical Brief. REL 2008-No. 002

    ERIC Educational Resources Information Center

    Henderson, Susan; Petrosino, Anthony; Guckenburg, Sarah; Hamilton, Stephen

    2008-01-01

    This technical brief examines whether, after two years of implementation, schools in Massachusetts using quarterly benchmark exams aligned with state standards in middle school mathematics showed greater gains in student achievement than those not doing so. A quasi-experimental design, using covariate matching and comparative interrupted…

  1. Crowder College MARET Center Facility Final Scientific/Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rand, Amy

    This project was a research facility construction project and did not include actual research. The new facility will benefit the public by providing training opportunities for students, as well as incubator and laboratory space for entrepreneurs in the areas of alternative and renewable energies. The 9,216 -square-foot Missouri Alternative and Renewable Energy Technology (MARET) Center was completed in late 2011. Classes in the MARET Center began in the spring 2012 semester. Crowder College takes pride in the MARET Center, a focal point of the campus, as the cutting edge in education, applied research and commercial development in the growing fieldmore » of green technology.« less

  2. Hawaiian Volcano Observatory 1956 Quarterly Administrative Reports

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. This report consists of four parts.

  3. Low cost hydrogen/novel membrane technology for hydrogen separation from synthesis gas, Phase 1. Quarterly technical progress report for the period ending March 31, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-12-31

    The goal of this program is to develop polymer membranes useful in the preparation of hydrogen from coal-derived synthesis gas. During this quarter the first experiment were aimed at developing high performance composite membranes for the separation of hydrogen from nitrogen and carbon monoxide. Three polymers have been selected as materials for these membranes: polyetherimide cellulose acetate and ethylcellulose. This quarter the investigators worked on polyetherimide and cellulose acetate membranes. The overall structure of these membranes is shown schematically in Figure 1. As shown, a microporous support membrane is first coated with a high flux intermediate layer then with anmore » ultrathin permselective layer and finally, if necessary, a thin protective high flux layer. 1 fig., 4 tabs.« less

  4. Electric power quarterly: January-March 1988. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-07-22

    The Electric Power Quarterly (EPQ) presents information on electric utilities at the plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, federal, and state agencies; industry; and the general public. In this report, data regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and qualitymore » of fossil-fuel receipts are presented on a plant-by-plant basis for plants with a combined installed nameplate capacity of 50 megawatts or larger.« less

  5. Correlation between quarter-point angle and nuclear radius

    NASA Astrophysics Data System (ADS)

    Ma, Wei-Hu; Wang, Jian-Song; Mukherjee, S.; Wang, Qi; Patel, D.; Yang, Yan-Yun; Ma, Jun-Bing; Ma, Peng; Jin, Shi-Lun; Bai, Zhen; Liu, Xing-Quan

    2017-04-01

    The correlation between quarter-point angle of elastic scattering and nuclear matter radius is studied systematically. Various phenomenological formulae with parameters for nuclear radius are adopted and compared by fitting the experimental data of quarter point angle extracted from nuclear elastic scattering reaction systems. A parameterized formula related to binding energy is recommended, which gives a good reproduction of nuclear matter radii of halo nuclei. It indicates that the quarter-point angle of elastic scattering is quite sensitive to the nuclear matter radius and can be used to extract the nuclear matter radius. Supported by National Natural Science Foundation of China (U1432247, 11575256), National Basic Research Program of China (973 Program)(2014CB845405 and 2013CB83440x) and (SM) Chinese Academy of Sciences President’s International Fellowship Initiative (2015-FX-04)

  6. Apprentices and Trainees: Early Trend Estimates. December Quarter 2010

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2011

    2011-01-01

    This publication presents early estimates of apprentice and trainee commencements for the December quarter 2010. Indicative information about this quarter is presented here; the most recent figures are estimated, taking into account reporting lags that occur at the time of data collection. The early trend estimates are derived from the National…

  7. JLTN Quarterly, 1995-1996.

    ERIC Educational Resources Information Center

    JLTN Quarterly, 1996

    1996-01-01

    This document consists of the four issues of the "JLTN Quarterly" issued from December 1995 to October 1996. This journal for high school Japanese language teachers contain articles on class activities and classroom teaching techniques. These include: exercises in interpretation of a Toys "R" Us store map and advertising; a weather discussion…

  8. English Leadership Quarterly, 1994.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.; Kiernan, Henry, Ed.

    1994-01-01

    These 4 issues of the English Leadership Quarterly comprise volume 16, published during 1994. Articles in number 1 deal with practical advice, and include: "The Law of Privacy and the Writing Teacher" (Ben T. Allen); Beware of Teachers Who Laminate Their Lesson Plans and Other Useful Suggestions about Teaching" (Robert Perrin);…

  9. Natural gas imports and exports. First quarter report 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment Cmore » shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).« less

  10. 10 CFR 52.17 - Contents of applications; technical information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...

  11. 10 CFR 52.17 - Contents of applications; technical information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...

  12. 10 CFR 52.17 - Contents of applications; technical information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...

  13. 10 CFR 52.17 - Contents of applications; technical information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...

  14. Hydroacoustic Studies Using HydroCAM - Station-centric Integration of Models and Observations Quarterly Report No.4 July 2003 - September 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Upton, Zachary, M.; Pulli, Jay, J.

    2003-10-13

    OAK B272 Quarterly technical report summarizing BBN's efforts to improve DOE's hydroacoustic modeling and analysis capability for nuclear explosion monitoring. BBN's work during the third quarter of 2003 was focused on preparations for and participation in the 2003 Seismic Research Review Meeting, unit testing and bug fixes to HydroCAM 4.1, data collection and analysis, and procuring high-resolution bathymetric data. In an attempt to save money, BBN scaled back its labor in the third quarter, delaying some deliverables but saving contract funding in case our next increment is delayed. We have succeeded in finding the correct Naval contact that can helpmore » us procure high-resolution bathymetry data. Although these data may require the release of a classified version of HydroCAM, we are optimistic that we will be able to acquire and integrate high-resolution bathymetric data near the Indian Ocean IMS stations. HydroCAM 4.1, which includes the ability to make blockage predictions using varying resolution bathymetric data, has completed unit testing and is now under integration (release) testing. We hope to deliver that functionality to DOE and AFTAC in November. BBN improved its database of hydroacoustic events in the Indian Ocean by including meta-data for associated arrivals. For each earthquake event, BBN is now picking the direct arrival at each station (Diego Garcia North and South, and Cape Leeuwin) and associating that arrival with the origin information that we are compiling. The data for 2001, 2002 and 2003 (to date) will be delivered to LLNL for integration into the Knowledge Base during the fourth quarter of 2003.« less

  15. Deliberate Science, Continuum Magazine: Clean Energy Innovation at NREL, Winter 2012 (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-02-01

    This quarterly magazine is dedicated to stepping beyond the technical journals to reveal NREL's vital work in a real-world context for our stakeholders. Continuum provides insights into the latest and most impactful clean energy innovations, while spotlighting those talented researchers and unique facilities that make it all happen. This edition focuses on deliberate science.

  16. Quarterly Technical Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mary K. Banken

    This project has identified all FDD oil reservoirs in Oklahoma; grouped those reservoirs into plays that have similar depositional origins; collected, organized, and analyzed all available data; conducted characterization and simulation studies on selected reservoirs in each plays; and implemented a technology transfer program targeted to the operators of FDD reservoirs. By fulfilling these objectives, the FDD project has had the goal of helping to sustain the life expectancy of existing wells and provide incentive for development and exploratory wells with the ultimate objective of increasing oil recovery.

  17. 6 CFR 27.120 - Designation of a coordinating official; Consultations and technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... covered facility shall submit a written request for consultation or technical assistance to the...; Consultations and technical assistance. 27.120 Section 27.120 Domestic Security DEPARTMENT OF HOMELAND SECURITY... coordinating official; Consultations and technical assistance. (a) The Assistant Secretary will designate a...

  18. Site Operator technical report. Final report (1992--1996)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The Southern California Edison Company (SCE) and the US Department of Energy (DOE) entered into cooperative agreement No. DE-FC07-91ID13077 on August 23, 1991, which expired on August 3, 1996. This cooperative agreement provided SCE with DOE cofunding for participation in the DOE`s Electric and Hybrid Vehicle Site Operator Program. In return, SCE provided the DOE with quarterly progress reports which include operating and maintenance data for the electric (EVs) vehicles in SCE`s fleet. Herein is SCE`s final report for the 1992 to 1996 agreement period. As of September 1, 1996 the SCE fleet had 65 electric vehicles in service. Amore » total of 578,200 miles had been logged. During the agreement period, SCE sent the DOE a total of 19 technical reports (Appendix B). This report summarizes the technical achievements which took place during a long, productive and rewarding, relationship with the DOE.« less

  19. 45 CFR 265.4 - When are quarterly reports due?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COLLECTION AND REPORTING REQUIREMENTS § 265.4 When are quarterly reports due? (a) Each State must file the TANF Data Report and the TANF Financial Report (or, as applicable, the Territorial Financial Report... 45 Public Welfare 2 2010-10-01 2010-10-01 false When are quarterly reports due? 265.4 Section 265...

  20. 46 CFR 32.60-25 - Living quarters-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Living quarters-TB/ALL. 32.60-25 Section 32.60-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL...—TB/ALL. For living quarters the partitions and sheathing shall be of an approved fire resistive...

  1. 46 CFR 32.60-25 - Living quarters-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Living quarters-TB/ALL. 32.60-25 Section 32.60-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL...—TB/ALL. For living quarters the partitions and sheathing shall be of an approved fire resistive...

  2. 46 CFR 32.60-25 - Living quarters-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Living quarters-TB/ALL. 32.60-25 Section 32.60-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL...—TB/ALL. For living quarters the partitions and sheathing shall be of an approved fire resistive...

  3. 46 CFR 32.60-25 - Living quarters-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Living quarters-TB/ALL. 32.60-25 Section 32.60-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL...—TB/ALL. For living quarters the partitions and sheathing shall be of an approved fire resistive...

  4. 46 CFR 32.60-25 - Living quarters-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Living quarters-TB/ALL. 32.60-25 Section 32.60-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL...—TB/ALL. For living quarters the partitions and sheathing shall be of an approved fire resistive...

  5. Trustee Quarterly, 2000-2001.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 2001

    2001-01-01

    This document contains 4 issues of the Trustee Quarterly: fall 2000, spring 2001, summer 2001, and fall 2001. The fall 2000 issue contains seven features and six departments. Among the features are: "The New Economy: Who Will Lead the Education Movement," by Rucker; "Community Colleges Tackle IT Staffing Challenges," by Matina; and "Looking at…

  6. 6. Photographic copy of architectural elevations for Officers' Quarters "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of architectural elevations for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Elevations & Details, Sheet No. 13 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA

  7. 5. Photographic copy of architectural floor plans for Officers' Quarters ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of architectural floor plans for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Floor Plan, Foundation Plan & Details, Sheet No. 12 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA

  8. Occidental vertical modified in situ process for the recovery of oil from oil shale. Phase II. Quarterly progress report, September 1, 1980-November 30, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    The major activities at OOSI's Logan Wash site during the quarter were: mining the voids at all levels for Retorts 7 and 8; blasthole drilling; tracer testing MR4; conducting the start-up and burner tests on MR3; continuing the surface facility construction; and conducting Retorts 7 and 8 related Rock Fragmentation tests. Environmental monitoring continued during the quarter, and the data and analyses are discussed. Sandia National Laboratory and Laramie Energy Technology Center (LETC) personnel were active in the DOE support of the MR3 burner and start-up tests. In the last section of this report the final oil inventory for Retortmore » 6 production is detailed. The total oil produced by Retort 6 was 55,696 barrels.« less

  9. Third Quarter Hanford Seismic Report for Fiscal Year 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.

    2009-09-30

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the eventmore » of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 771 local earthquakes during the third quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during the January – March 2009 time period and reported in the previous quarterly report (Rohay et al, 2009). The frequency of Wooded Island events has subsided with 16 events recorded during June 2009. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 25 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.2 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest

  10. Guidelines for Establishing and Evaluating High School Technical Electromechanics Programs.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Technical and Adult Education.

    Educators and industrial representatives developed these guidelines for school officials, instructors in technical education, and program and facility planners to use in planning a high school program in technical electromechanics. Designed to train students for entry into industry in applied electromechanics, the program includes electricity,…

  11. SLAVE QUARTERS (RESTORED). This is the north building, one of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SLAVE QUARTERS (RESTORED). This is the north building, one of the two identical buildings in the plantation. Each building has a 2-room plan. - Hopsewee Plantation, Slave Quarters, U.S. Routes 17 & 701, Santee River, North, Georgetown, Georgetown County, SC

  12. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  13. Is the closest facility the one actually used? An assessment of travel time estimation based on mammography facilities.

    PubMed

    Alford-Teaster, Jennifer; Lange, Jane M; Hubbard, Rebecca A; Lee, Christoph I; Haas, Jennifer S; Shi, Xun; Carlos, Heather A; Henderson, Louise; Hill, Deirdre; Tosteson, Anna N A; Onega, Tracy

    2016-02-18

    Characterizing geographic access depends on a broad range of methods available to researchers and the healthcare context to which the method is applied. Globally, travel time is one frequently used measure of geographic access with known limitations associated with data availability. Specifically, due to lack of available utilization data, many travel time studies assume that patients use the closest facility. To examine this assumption, an example using mammography screening data, which is considered a geographically abundant health care service in the United States, is explored. This work makes an important methodological contribution to measuring access--which is a critical component of health care planning and equity almost everywhere. We analyzed one mammogram from each of 646,553 women participating in the US based Breast Cancer Surveillance Consortium for years 2005-2012. We geocoded each record to street level address data in order to calculate travel time to the closest and to the actually used mammography facility. Travel time between the closest and the actual facility used was explored by woman-level and facility characteristics. Only 35% of women in the study population used their closest facility, but nearly three-quarters of women not using their closest facility used a facility within 5 min of the closest facility. Individuals that by-passed the closest facility tended to live in an urban core, within higher income neighborhoods, or in areas where the average travel times to work was longer. Those living in small towns or isolated rural areas had longer closer and actual median drive times. Since the majority of US women accessed a facility within a few minutes of their closest facility this suggests that distance to the closest facility may serve as an adequate proxy for utilization studies of geographically abundant services like mammography in areas where the transportation networks are well established.

  14. F-Area Acid/Caustic Basin groundwater monitoring report. First quarter 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-01

    During first quarter 1995, samples from the FAC monitoring wells at the F-Area Acid/Caustic Basin were collected and analyzed for herbicides/pesticides, indicator parameters, metals, nitrate, radionuclide indicators, volatile organic compounds, and other constituents. Piezometer FAC 5P and monitoring well FAC 6 were dry and could not be sampled. New monitoring wells FAC 9C, 10C, 11C, and 12C were completed in the Barnwell/McBean aquifer and were sampled for the first time during third quarter 1994 (first quarter 1995 is the third of four quarters of data required to support the closure of the basin). Analytical results that exceeded final Primary Drinkingmore » Water Standards (PDWS), other Savannah River Site (SRS) Flag 2 criteria, or the SRS turbidity standard of 50 NTU during the quarter were as follows: gross alpha exceeded the final PDWS and aluminum, iron, manganese, and total alpha-emitting radium exceeded the SRS Flag 2 criteria in one or more of the FAC wells. Turbidity exceeded the SRS standard (50 NTU) in wells FAC 3 and 11C. Groundwater flow direction and rate in the water table beneath the F-Area Acid/Caustic Basin were similar to past quarters.« less

  15. Natural gas imports and exports, first quarter report 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basismore » to Canada and Mexico.« less

  16. Natural gas imports and exports, fourth quarter report 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis tomore » Canada and Mexico.« less

  17. Close Quarters Combat Shooting

    DTIC Science & Technology

    2010-04-14

    I came into this research with my own thesis as to which method works best in close quarters combat and aimed to provide the evidence to confirln...when research has shovm. that a great majority of gunfights occur at close distances that physiologically don’t allow an officer to focus on his gun’s

  18. 270. OFFICERS' QUARTERS (FORMER SUMMER COTTAGES) AT DOG PATCH BEACH, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    270. OFFICERS' QUARTERS (FORMER SUMMER COTTAGES) AT DOG PATCH BEACH, C. 1939. VIEW NORTH DOWN GREENWICH ROAD TOWARD FORMER SUMMER COTTAGES, CONVERTED TO OFFICER'S QUARTERS, OVER-LOOKING DOG PATCH BEACH. - Quonset Point Naval Air Station, Roger Williams Way, North Kingstown, Washington County, RI

  19. Applied Meteorology Unit (AMU) Quarterly Report. First Quarter FY-05

    NASA Technical Reports Server (NTRS)

    Bauman, William; Wheeler, Mark; Lambert, Winifred; Case, Jonathan; Short, David

    2005-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2005 (October - December 2005). Tasks reviewed include: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Stable Low Cloud Evaluation, (5) Shuttle Ascent Camera Cloud Obstruction Forecast, (6) Range Standardization and Automation (RSA) and Legacy Wind Sensor Evaluation, (7) Advanced Regional Prediction System (ARPS) Optimization and Training Extension, and (8) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest

  20. Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-09

    NASA Technical Reports Server (NTRS)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2009-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the fourth quarter of Fiscal Year 2009 (July - September 2009). Tasks reports include: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool. Phase III, (3) Peak Wind Tool for General Forecasting. Phase II, (4) Update and Maintain Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS), (5) Verify MesoNAM Performance (6) develop a Graphical User Interface to update selected parameters for the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLlT)

  1. Utility-Scale Future, Continuum Magazine: Clean Energy Innovation at NREL, Spring 2011, Issue 1 Vol. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-08-01

    This quarterly magazine is dedicated to stepping beyond the technical journals to reveal NREL's vital work in a real-world context for our stakeholders. Continuum provides insights into the latest and most impactful clean energy innovations, while spotlighting those talented researchers and unique facilities that make it all happen. This edition focuses on creating a utility-scale future.

  2. 43. CAPE COD AIR STATION PAVE PAWS FACILITY WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. CAPE COD AIR STATION PAVE PAWS FACILITY - WITH BUILDING METAL SIDING BEING APPLIED ON "C" FACE (RIGHT) AND "B" FACE BEING PREPARED FOR INSTALLATION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Investigation of mineral transformations and ash deposition during staged combustion. Quarterly technical progress report, April 1, 1997--June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harb, J.N.

    This report describes work performed in the fifteenth quarter of a fundamental study to examine the effect of staged combustion on ash formation and deposition. Efforts this quarter included addition of a new cyclone for improved particle sampling and modification of the existing sampling probe. Particulate samples were collected under a variety of experimental conditions for both coals under investigation. Deposits formed from the Black Thunder coal were also collected. Particle size and composition from the Pittsburgh No. 8 ash samples support previously reported results. In addition, the authors ability to distinguish char/ash associations has been refined and applied tomore » a variety of ash samples from this coal. The results show a clear difference between the behavior of included and excluded pyrite, and provide insight into the extent of pyrite oxidation. Ash samples from the Black Thunder coal have also been collected and analyzed. Results indicate a significant difference in the particle size of {open_quotes}unclassifiable{close_quotes} particles for ash formed during staged combustion. A difference in composition also appears to be present and is currently under investigation. Finally, deposits were collected under staged conditions for the Black Thunder coal. Specifically, two deposits were formed under similar conditions and allowed to mature under either reducing or oxidizing conditions in natural gas. Differences between the samples due to curing were noted. In addition, both deposits showed skeletal ash structures which resulted from in-situ burnout of the char after deposition.« less

  4. 14 CFR 93.325 - Quarterly reporting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Office. (b) Each quarterly report must contain the following information. (1) Make and model of aircraft; (2) Identification number (registration number) for each aircraft; (3) Departure airport for each...

  5. 14 CFR 93.325 - Quarterly reporting.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Office. (b) Each quarterly report must contain the following information. (1) Make and model of aircraft; (2) Identification number (registration number) for each aircraft; (3) Departure airport for each...

  6. 14 CFR 93.325 - Quarterly reporting.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Office. (b) Each quarterly report must contain the following information. (1) Make and model of aircraft; (2) Identification number (registration number) for each aircraft; (3) Departure airport for each...

  7. Texas State Technical College Review.

    ERIC Educational Resources Information Center

    Aumack, Bruce; Blake, Larry J.

    Texas educational legislation for 1991 required the Texas Higher Education Coordinating Board (THECB) to review the operations of, and the continuing need for, each of the four main campuses and five extension centers of the Texas State Technical College System (TSTCS), and to make recommendations concerning the facilities' continuation and/or…

  8. Technical and Vocational Education in Kuwait.

    ERIC Educational Resources Information Center

    Al-Ali, Salahaldeen

    1993-01-01

    The Kuwaiti system of vocational-technical education has not lived up to expectations because of low student aptitude, lack of managerial and academic facilities, and weak industrial linkages. The Gulf War exacerbated skilled labor shortages, leaving the country dependent on expatriates. (SK)

  9. Solid Waste Program technical baseline description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  10. Microbiota of Cow’s Milk; Distinguishing Healthy, Sub-Clinically and Clinically Diseased Quarters

    PubMed Central

    Oikonomou, Georgios; Bicalho, Marcela Lucas; Meira, Enoch; Rossi, Rodolfo Elke; Foditsch, Carla; Machado, Vinicius Silva; Teixeira, Andre Gustavo Vieira; Santisteban, Carlos; Schukken, Ynte Hein; Bicalho, Rodrigo Carvalho

    2014-01-01

    The objective of this study was to use pyrosequencing of the 16S rRNA genes to describe the microbial diversity of bovine milk samples derived from clinically unaffected quarters across a range of somatic cell counts (SCC) values or from clinical mastitis, culture negative quarters. The obtained microbiota profiles were used to distinguish healthy, subclinically and clinically affected quarters. Two dairy farms were used for the collection of milk samples. A total of 177 samples were used. Fifty samples derived from healthy, culture negative quarters with a SCC of less than 20,000 cells/ml (group 1); 34 samples derived from healthy, culture negative quarters, with a SCC ranging from 21,000 to 50,000 cells/ml (group 2); 26 samples derived from healthy, culture negative quarters with a SCC greater than 50,000 cells/ml (group 3); 34 samples derived from healthy, culture positive quarters, with a SCC greater than 400,000 (group 4, subclinical); and 33 samples derived from clinical mastitis, culture negative quarters (group 5, clinical). Bacterial DNA was isolated from these samples and the 16S rRNA genes were individually amplified and pyrosequenced. All samples analyzed revealed great microbial diversity. Four bacterial genera were present in every sample obtained from healthy quarters (Faecalibacterium spp., unclassified Lachnospiraceae, Propionibacterium spp. and Aeribacillus spp.). Discriminant analysis models showed that samples derived from healthy quarters were easily discriminated based on their microbiota profiles from samples derived from clinical mastitis, culture negative quarters; that was also the case for samples obtained from different farms. Staphylococcus spp. and Streptococcus spp. were among the most prevalent genera in all groups while a general multivariable linear model revealed that Sphingobacterium and Streptococcus prevalences were associated with increased 10 log SCC. Conversely, Nocardiodes and Paenibacillus were negatively correlated, and a

  11. Analysis of decommissioning costs for the AFRRI TRIGA reactor facility. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsbacka, M.; Moore, M.

    1989-12-01

    This report provides a cost analysis for decommissioning the Armed Forces Radiobiology Research Institute (AFRRI) TRIGA reactor facility. AFRRI is not suggesting that the AFRRI TRIGA reactor facility be decommissioned. This report was prepared in compliance with paragraph 50.33 of Title 10, Code of Federal Regulations, which requires that funding for the decommissioning of reactor facilities be available when licensed activities cease. The planned method of decommissioning is complete decontamination (DECON) of the AFRRI TRIGA reactor site to allow for restoration of the site to full public access. The cost of DECON in 1990 dollars is estimated to be $3,200,000.more » The anticipated ancillary costs of facility site demobilization and spent fuel shipment will be an additional $600,000. Thus, the total cost of terminating reactor operations at AFRRI will be about $3,800,000. The primary basis for developing this cost estimate was a study of the decommissioning costs of similar reactor facility performed by Battelle Pacific Northwest Laboratory, as provided in U.S. Nuclear Regulatory Commission publication NUREG/CR-1756. The data in this study were adapted to reflect the decommissioning requirements of the AFRRI TRIGA reactor facility.« less

  12. Evolution of the Lunar Receiving Laboratory to the Astromaterial Sample Curation Facility: Technical Tensions Between Containment and Cleanliness, Between Particulate and Organic Cleanliness

    NASA Technical Reports Server (NTRS)

    Allton, J. H.; Zeigler, R. A.; Calaway, M. J.

    2016-01-01

    The Lunar Receiving Laboratory (LRL) was planned and constructed in the 1960s to support the Apollo program in the context of landing on the Moon and safely returning humans. The enduring science return from that effort is a result of careful curation of planetary materials. Technical decisions for the first facility included sample handling environment (vacuum vs inert gas), and instruments for making basic sample assessment, but the most difficult decision, and most visible, was stringent biosafety vs ultra-clean sample handling. Biosafety required handling of samples in negative pressure gloveboxes and rooms for containment and use of sterilizing protocols and animal/plant models for hazard assessment. Ultra-clean sample handling worked best in positive pressure nitrogen environment gloveboxes in positive pressure rooms, using cleanable tools of tightly controlled composition. The requirements for these two objectives were so different, that the solution was to design and build a new facility for specific purpose of preserving the scientific integrity of the samples. The resulting Lunar Curatorial Facility was designed and constructed, from 1972-1979, with advice and oversight by a very active committee comprised of lunar sample scientists. The high precision analyses required for planetary science are enabled by stringent contamination control of trace elements in the materials and protocols of construction (e.g., trace element screening for paint and flooring materials) and the equipment used in sample handling and storage. As other astromaterials, especially small particles and atoms, were added to the collections curated, the technical tension between particulate cleanliness and organic cleanliness was addressed in more detail. Techniques for minimizing particulate contamination in sample handling environments use high efficiency air filtering techniques typically requiring organic sealants which offgas. Protocols for reducing adventitious carbon on sample

  13. 77 FR 27021 - Proposed Information Collection; Comment Request; Quarterly Survey of Financial Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Request; Quarterly Survey of Financial Services Transactions Between U.S. Financial Services Providers [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract Form BE-185, Quarterly Survey of Financial Services Transactions between U.S. Financial Services Providers and Foreign Persons, obtains quarterly data from U.S...

  14. 42. CAPE COD AIR STATION PAVE PAWS FACILITY SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE AT 46T DAY OF STEEL CONSTRUCTION. "BUILDING TOPPED OFF, 7 JULY, 1974. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  15. Identification of User Facility Related Publications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, Robert M; Stahl, Christopher G; Wells, Jack C

    2012-01-01

    Scientific user facilities provide physical resources and technical support that enable scientists to conduct experiments or simulations pertinent to their respective research. One metric for evaluating the scientific value or impact of a facility is the number of publications by users as a direct result of using that facility. Unfortunately, for a variety of reasons, capturing accurate values for this metric proves time consuming and error-prone. This work describes a new approach that leverages automated browser technology combined with text analytics to reduce the time and error involved in identifying publications related to user facilities. With this approach, scientific usermore » facilities gain more accurate measures of their impact as well as insight into policy revisions for user access.« less

  16. Cristoforetti in Crew quarters

    NASA Image and Video Library

    2014-12-06

    iss042e023422 (12/6/14) --- Expedition 42 Flight Engineer Samantha Cristoforetti of the European Space Agency (ESA) on 6 December 2014 is seen inside of a sleeping bag in her personal crew quarters on the International Space Station. Astronauts will strap the bag to the wall to prevent from free floating and potentially bumping into equipment while sleeping.

  17. Government Information Quarterly. Volume 7, no. 2: National Aeronautics and Space Administration Scientific and Technical Information Programs. Special issue

    NASA Technical Reports Server (NTRS)

    Hernon, Peter (Editor); Mcclure, Charles R. (Editor); Pinelli, Thomas E. (Editor)

    1990-01-01

    NASA scientific and technical information (STI) programs are discussed. Topics include management of information in a research and development agency, the new space and Earth science information systems at NASA's archive, scientific and technical information management, and technology transfer of NASA aerospace technology to other industries.

  18. Applied Meteorology Unit (AMU) Quarterly Report Third Quarter FY-08

    NASA Technical Reports Server (NTRS)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Dreher, Joseph

    2008-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the third quarter of Fiscal Year 2008 (April - June 2008). Tasks reported on are: Peak Wind Tool for User Launch Commit Criteria (LCC), Anvil Forecast Tool in AWIPS Phase II, Completion of the Edward Air Force Base (EAFB) Statistical Guidance Wind Tool, Volume Averaged Height Integ rated Radar Reflectivity (VAHIRR), Impact of Local Sensors, Radar Scan Strategies for the PAFB WSR-74C Replacement, VAHIRR Cost Benefit Analysis, and WRF Wind Sensitivity Study at Edwards Air Force Base

  19. U.S. Department of Energy Nevada Operations Office Environmental Monitoring Program summary data report, second calendar quarter 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Townsend, Y.E.

    1997-02-01

    The Nevada Test Site (NTS), located in southern Nevada, has been the primary location for testing of nuclear explosives in the continental US. Testing began in 1951 and continued until the moratorium in 1992. Waste storage and disposal facilities for defense radioactive and mixed waste are located in Areas 3 and 5. At the Area 5 Radioactive Waste Management Site (RWMS-5), low-level wastes (LLW) from US Department of Energy (DOE) affiliated onsite and offsite generators are disposed of using standard shallow land disposal techniques. Transuranic wastes are retrievably stored at the RWMS-5 in containers on a surface pad, pending shipmentmore » to the Waste Isolation Pilot Plant facility in New Mexico. Nonradioactive hazardous wastes are accumulated at a special site before shipment to a licensed offsite disposal facility. Non-standard packages of LLW are buried in subsidence craters in the Area 3 RWMS. This report describes these activities on and around the NTS and includes a listing of the results obtained from environmental surveillance activities during the second calendar quarter of 1996.« less

  20. Technical Support Document for Title V Permitting of Printing Facilities

    EPA Pesticide Factsheets

    Stationary source emissions monitoring is required to demonstrate that a source is meeting the requirements in Federal or state rules, including Title V. This document provides the technical support for compliance in the printing and publishing industry.

  1. WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION W/POLE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION W/POLE. - Naval Magazine Lualualei, Headquarters Branch, Warrant Officer's & Civilians Quarters Type, Along Sixty-sixth Street between Amberjack & Constitution Streets, Pearl City, Honolulu County, HI

  2. PV Working with Industry, 2nd Quarter, 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poole, L.; Moon, S.

    2000-06-29

    NREL PV Working With Industry is a quarterly newsletter devoted to the research, development, and deployment performed by NREL staff in concert with their industry and university partners. The Second Quarter, 2000, issue is titled ``Our Shared PV Future''. It contains a review of several important PV-related meetings held in the prior three months: the NCPV Program Review, the 16 European PV Conference, and year-2000 Earth Day activities in Denver, CO. The editorialist is Paul Maycock, Publisher of PV News.

  3. The WSTIAC Quarterly. Volume 9, Number 2, 2009

    DTIC Science & Technology

    2009-01-01

    Services Robert Fitzgibbon Bruce Dudley Product Sales Gina Nash http://wstiac.alionscience.com/quarterly http://wstiac.alionscience.com/quarterly http... B2b =45 deg B2b =50 deg B2b =35 deg B2b =25 deg B2b =0 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0.55 0.50 To ta l-t o- St at ic Po ly tro pi c ef fic en

  4. Three-quarter views are subjectively good because object orientation is uncertain.

    PubMed

    Niimi, Ryosuke; Yokosawa, Kazuhiko

    2009-04-01

    Because the objects that surround us are three-dimensional, their appearance and our visual perception of them change depending on an object's orientation relative to a viewpoint. One of the most remarkable effects of object orientation is that viewers prefer three-quarter views over others, such as front and back, but the exact source of this preference has not been firmly established. We show that object orientation perception of the three-quarter view is relatively imprecise and that this impreciseness is related to preference for this view. Human vision is largely insensitive to variations among different three-quarter views (e.g., 45 degrees vs. 50 degrees ); therefore, the three-quarter view is perceived as if it corresponds to a wide range of orientations. In other words, it functions as the typical representation of the object.

  5. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  6. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  7. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  8. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  9. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  10. 12 CFR 327.12 - Prepayment of quarterly risk-based assessments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Prepayment of quarterly risk-based assessments... STATEMENTS OF GENERAL POLICY ASSESSMENTS In General § 327.12 Prepayment of quarterly risk-based assessments. (a) Requirement to prepay assessment. On December 30, 2009, each insured depository institution shall...

  11. 39 CFR 243.2 - Quarters.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION CONDUCT OF OFFICES § 243.2 Quarters. (a.... Postal Service, General Accounting Office Building, Washington, DC 20260, with a memorandum of... depositing mail in front of or next to the post office. Show collection time schedules on letterboxes. At...

  12. Gifted Education Press Quarterly, 2001.

    ERIC Educational Resources Information Center

    Fisher, Maurice D., Ed.

    2001-01-01

    These four issues of this quarterly publication on the education of gifted students contain the following featured articles: (1) "Reflections on China: Implications for Gifted Education" (Andrea I. Prejean and Lynn H. Fox); (2) "Differentiating Instruction for Gifted Middle School Students in Heterogeneous Science Classes"…

  13. Technical Review of the Laboratory Biosphere Closed Ecological System Facility

    NASA Astrophysics Data System (ADS)

    Dempster, W.; van Thillo, M.; Alling, A.; Allen, J.; Silverstone, S.; Nelson, M.

    The "Laboratory Biosphere", a new closed ecological system facility in Santa Fe, New Mexico (USA) has been constructed and became operational in May 2002. Built and operated by the Global Ecotechnics consortium (Biosphere Technologies and Biosphere Foundation with Biospheric Design Inc., and the Institute of Ecotechnics), the research apparatus for intensive crop growth, biogeochemical cycle dynamics and recycling of inedible crop biomass comprises a sealed cylindrical steel chamber and attached variable volume chamber (lung) to prevent pressures caused by the expansion and contraction of the contained air. The cylindrical growing chamber is 3.7m (12 feet) long and 3.7m (12 foot) diameter, giving an internal volume of 34 m3 (1200 ft 3 ). The two crop growth beds cover 5.5 m2, with a soil depth of 0.3m (12 inches), with 12 x 1000 watt high-pressure sodium lights capable of variable lighting of 40-70 mol per m2 per day. A small soil bed reactor in the chamber can be activated to help with metabolism of chamber trace gases. The volume of the attached variable volume chamber (lung) can range between 0-11 m3 (0-400 ft 3 ). Evapotranspired and soil leachate water are collected, combined and recycled to water the planting beds. Sampling ports enable testing of water quality of leachate, condensate and irrigation water. Visual inspection windows provide views of the entire interior and growing beds. The chamber is also outfitted with an airlock to minimize air exchange when people enter and work in the chamber. Continuous sensors include atmospheric CO2 and oxygen, temperature, humidity, soil moisture, light level and water levels in reservoirs. Both "sniffer" (air ports) and "sipper" (water ports) will enable collection of water or air samples for detailed analysis. This paper reports on the development of this new soil-based bioregenerative life support closed system apparatus and its technical challenges and capabilities.

  14. 78 FR 23903 - Proposed Information Collection; Comment Request; Quarterly Summary of State and Local Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Quarterly Summary of State and Local Government Tax Revenue, using the F-71 (Quarterly Survey of Property Tax Collections), F-72 (Quarterly Survey of State Tax Collections), and F-73 (Quarterly Survey of Non... data for individual states. The information contained in this survey is the most current information...

  15. 77 FR 71288 - Revisions to Electric Quarterly Report Filing Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ... its regulations to change the process for filing Electric Quarterly Reports (EQR). Due to technology... option.\\80\\ \\78\\ See, e.g., EEI at 8; Links Technology Solutions at 2; Pacific Gas and Electric at 6. \\79...; Order No. 770] Revisions to Electric Quarterly Report Filing Process AGENCY: Federal Energy Regulatory...

  16. 52. Photocopy of copy of original Officers' Duplex Quarters drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photocopy of copy of original Officers' Duplex Quarters drawing by Copeland, 7 April 1932 (Original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University). Heating - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS

  17. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  18. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  19. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  20. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  1. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  2. International Space Station USOS Crew Quarters Development

    NASA Technical Reports Server (NTRS)

    Broyan, James Lee, Jr.; Borrego, Melissa Ann; Bahr, Juergen F.

    2008-01-01

    The International Space Station (ISS) United States Operational Segment (USOS) currently provides a Temporary Sleep Station (TeSS) as crew quarters for one crewmember in the Laboratory Module. The Russian Segment provides permanent crew quarters (Kayutas) for two crewmembers in the Service Module. The TeSS provides limited electrical, communication, and ventilation functionality. A new permanent rack sized USOS ISS Crew Quarters (CQ) is being developed. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The new CQs will provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, controllable airflow, communication equipment, redundant electrical systems, and redundant caution and warning systems. The rack sized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. Providing an acoustically quiet and visually isolated environment, while ensuring crewmember safety, is critical for obtaining crewmember rest and comfort to enable long term crewmember performance. The numerous human factor, engineering, and program considerations during the concept, design, and prototyping are outlined in the paper.

  3. Building 21st Century Schools: Designing Smarter, Sleeker High-Tech Facilities.

    ERIC Educational Resources Information Center

    Cutshall, Sandy

    2003-01-01

    The demand for high-tech programs in tandem with traditional classes challenges school districts to provide flexible facilities for career and technical education. Some districts partner with local businesses to develop state-of-the art facilities and deal with costs, upkeep, and upgrading. Some high-tech educational facilities are themselves…

  4. Life sciences licensing deals in the fourth quarter of 2017: updates and trends.

    PubMed

    D'Souza, P

    2018-02-01

    During the fourth quarter of 2017, Cortellis Competitive Intelligence registered 1,107 new deals (excluding mergers & acquisitions) as part of its ongoing coverage of licensing activity in the life sciences sector compared to 1,043 in the third quarter and 1,035 in the fourth quarter of 2016. Copyright 2018 Clarivate Analytics.

  5. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  6. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  7. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  8. Gifted Education Press Quarterly, 1995.

    ERIC Educational Resources Information Center

    Fisher, Maurice D., Ed.

    1995-01-01

    This document consists of the four issues of the newsletter "Gifted Education Press Quarterly" published during 1995. This newsletter addresses issues in the education of gifted children and youth. The major articles are: (1) "Using Today's Technology: Parents Can Help Challenge Gifted Children" (Adrienne O'Neill); (2)…

  9. Education Statistics Quarterly, Spring 2001.

    ERIC Educational Resources Information Center

    Education Statistics Quarterly, 2001

    2001-01-01

    The "Education Statistics Quarterly" gives a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data products and funding opportunities developed over a 3-month period. Each issue…

  10. 53. Photocopy of copy of original Officers' Duplex Quarters drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Photocopy of copy of original Officers' Duplex Quarters drawing by A.G.D., 7 April 1932 (original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University). Electrical - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS

  11. 51. Photocopy of copy of original Officers' Duplex Quarters drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photocopy of copy of original Officers' Duplex Quarters drawing by B.S. Elliott, 7 April 1932 (original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University). Plumbing - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS

  12. Focus on China. Joint Force Quarterly, Issue 47, 4th Quarter 2007

    DTIC Science & Technology

    2007-01-01

    and the informa- tion age —is creating a paper dragon. This issue of Joint Force Quarterly takes a look at China and Sino-U.S. engagement, as well...Golden Age because “forthwith, multitudes would resort to his dominions.”26 Confucius likened this dynamic almost to an irresistible force of...China’s support from an international perspective. China only recently became comfortable in its “liberal internationalist skin ,” but it has since

  13. Strategic Studies Quarterly. Volume 8, Number 3, Fall 2014

    DTIC Science & Technology

    2014-01-01

    Michael Guillot Measuring Military Power James Jay Carafano Strategy and Force Planning in a Time of Austerity BG Michael J . Meese, USA, Retired...Hudson, PhD Nori Katagiri, PhD Paul J . Springer, PhD Zachary J . Zwald, PhD Strategic Studies Quarterly (SSQ) (ISSN 1936-1815) is published quarterly...19 BG Michael J . Meese, USA, Retired Pensive Sword: Educating Officers in Austere Times ...................... 30 Stephen D. Chiabotti Feature

  14. Impact of performance-based financing on primary health care services in Haiti.

    PubMed

    Zeng, Wu; Cros, Marion; Wright, Katherine D; Shepard, Donald S

    2013-09-01

    To strengthen Haiti's primary health care (PHC) system, the country first piloted performance-based financing (PBF) in 1999 and subsequently expanded the approach to most internationally funded non-government organizations. PBF complements support (training and technical assistance). This study evaluates (a) the separate impact of PBF and international support on PHC's service delivery; (b) the combined impact of PBF and technical assistance on PHC's service delivery; and (c) the costs of PBF implementation in Haiti. To minimize the risk of facilities neglecting potential non-incentivized services, the incentivized indicators were randomly chosen at the end of each year. We obtained quantities of key services from four departments for 217 health centres (15 with PBF and 202 without) from 2008 through 2010, computed quarterly growth rates and analysed the results using a difference-in-differences approach by comparing the growth of incentivized and non-incentivized services between PBF and non-PBF facilities. To interpret the statistical analyses, we also interviewed staff in four facilities. Whereas international support added 39% to base costs of PHC, incentive payments added only 6%. Support alone increased the quantities of PHC services over 3 years by 35% (2.7%/quarter). However, support plus incentives increased these amounts by 87% over 3 years (5.7%/quarter) compared with facilities with neither input. Incentives alone was associated with a net 39% increase over this period, and more than doubled the growth of services (P < 0.05). Interview findings found no adverse impacts and, in fact, indicated beneficial impacts on quality. Incentives proved to be a relatively inexpensive, well accepted and very effective complement to support, suggesting that a small amount of money, strategically used, can substantially improve PHC. Haiti's experience, after more than a decade of use, indicates that incentives are an effective tool to strengthen PHC.

  15. Technical Report for Calculations of Atmospheric Dispersion at Onsite Locations for Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levin, Alan; Chaves, Chris

    2015-04-04

    The Department of Energy (DOE) has performed an evaluation of the technical bases for the default value for the atmospheric dispersion parameter χ/Q. This parameter appears in the calculation of radiological dose at the onsite receptor location (co-located worker at 100 meters) in safety analysis of DOE nuclear facilities. The results of the calculation are then used to determine whether safety significant engineered controls should be established to prevent and/or mitigate the event causing the release of hazardous material. An evaluation of methods for calculation of the dispersion of potential chemical releases for the purpose of estimating the chemical exposuremore » at the co-located worker location was also performed. DOE’s evaluation consisted of: (a) a review of the regulatory basis for the default χ/Q dispersion parameter; (b) an analysis of this parameter’s sensitivity to various factors that affect the dispersion of radioactive material; and (c) performance of additional independent calculations to assess the appropriate use of the default χ/Q value.« less

  16. Deployable Crew Quarters

    NASA Technical Reports Server (NTRS)

    Izenson, Michael G.; Chen, Weibo

    2008-01-01

    The deployable crew quarters (DCQ) have been designed for the International Space Station (ISS). Each DCQ would be a relatively inexpensive, deployable boxlike structure that is designed to fit in a rack bay. It is to be occupied by one crewmember to provide privacy and sleeping functions for the crew. A DCQ comprises mostly hard panels, made of a lightweight honeycomb or matrix/fiber material, attached to each other by cloth hinges. Both faces of each panel are covered with a layer of Nomex cloth and noise-suppression material to provide noise isolation from ISS. On Earth, the unit is folded flat and attached to a rigid pallet for transport to the ISS. On the ISS, crewmembers unfold the unit and install it in place, attaching it to ISS structural members by use of soft cords (which also help to isolate noise and vibration). A few hard pieces of equipment (principally, a ventilator and a smoke detector) are shipped separately and installed in the DCQ unit by use of a system of holes, slots, and quarter-turn fasteners. Full-scale tests showed that the time required to install a DCQ unit amounts to tens of minutes. The basic DCQ design could be adapted to terrestrial applications to satisfy requirements for rapid deployable emergency shelters that would be lightweight, portable, and quickly erected. The Temporary Early Sleep Station (TeSS) currently on-orbit is a spin-off of the DCQ.

  17. Gifted Education Press Quarterly, 1999.

    ERIC Educational Resources Information Center

    Fisher, Maurice D., Ed.

    1999-01-01

    This document consists of the four 1999 issues of a quarterly newsletter publication on gifted education. Issues regularly include major articles, book reviews, announcements, and letters. The major articles in these issues are: "The Mathematically Gifted: Bridging the Gender Gap" (Lynn H. Fox and Janet F. Soller); "Parenting for Education:…

  18. English Leadership Quarterly, 2000-2001.

    ERIC Educational Resources Information Center

    Kiernan, Henry, Ed.

    2001-01-01

    This 23rd volume of "English Leadership Quarterly" contains articles on topics of interest to those in positions of leadership in departments (elementary, secondary, or college) where English is taught. Each issue focuses on a different theme. Articles in Volume 23 Number 1 are: "Block Scheduling and Student Achievement"…

  19. Space Station Furnace Facility. Volume 2: Summary of technical reports

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics, and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. In order to accommodate the furnace modules with the resources required to operate, SSFF developed a design that meets the needs of the wide range of furnaces that are planned for the SSFF. The system design is divided into subsystems which provide the functions of interfacing to the SSF services, conditioning and control for furnace module use, providing the controlled services to the furnace modules, and interfacing to and acquiring data from the furnace modules. The subsystems, described in detail, are as follows: Power Conditioning and Distribution Subsystem; Data Management Subsystem; Software; Gas Distribution Subsystem; Thermal Control Subsystem; and Mechanical Structures Subsystem.

  20. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    facility. "We try to scope out some technical work that is based on the fundamental problem that technical or market problem that they're trying to solve, and then we'll scope out work with them based on that visit. "The second step is to begin to break that scope of work into what I call three

  1. Office of Science User Facilities Summary Report, Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-01-01

    The U.S. Department of Energy Office of Science provides the Nation’s researchers with worldclass scientific user facilities to propel the U.S. to the forefront of science and innovation. A user facility is a federally sponsored research facility available for external use to advance scientific or technical knowledge under the following conditions: open, accessible, free, collaborative, competitive, and unique.

  2. 45. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH BUILDING METAL SIDING BEING APPLIED ON "A" FACE (LEFT) AND "B" FACE (RIGHT). NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Superfund Redevelopment Initiative Quarterly Webinar Series

    EPA Pesticide Factsheets

    Superfund Redevelopment Initiative hosts a series of quarterly webinars on redevelopment of Superfund sites across the country that discuss the different types of reuse that are possible and share how particular sites have become reuse success stories.

  4. Survey of solar thermal test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Masterson, K.

    The facilities that are presently available for testing solar thermal energy collection and conversion systems are briefly described. Facilities that are known to meet ASHRAE standard 93-77 for testing flat-plate collectors are listed. The DOE programs and test needs for distributed concentrating collectors are identified. Existing and planned facilities that meet these needs are described and continued support for most of them is recommended. The needs and facilities that are suitable for testing components of central receiver systems, several of which are located overseas, are identified. The central contact point for obtaining additional details and test procedures for these facilitiesmore » is the Solar Thermal Test Facilities Users' Association in Albuquerque, N.M. The appendices contain data sheets and tables which give additional details on the technical capabilities of each facility. Also included is the 1975 Aerospace Corporation report on test facilities that is frequently referenced in the present work.« less

  5. Space Station Furnace Facility Core. Requirements definition and conceptual design study. Volume 2: Technical report. Appendix 6: Technical summary reports

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. The facility is designed to support a complement of furnace modules as outlined in the Science Capabilities Requirements Document (SCRD). The SSFF is a three rack facility that provides the functions, interfaces, and equipment necessary for the processing of the furnaces and consists of two main parts: the SSFF Core Rack and the two Experiment Racks. The facility is designed to accommodate two experimenter-provided furnace modules housed within the two experiment racks, and is designed to operate these two furnace modules simultaneously. The SCRD specifies a wide range of furnace requirements and serves as the basis for the SSFF conceptual design. SSFF will support automated processing during the man-tended operations and is also designed for crew interface during the permanently manned configuration. The facility is modular in design and facilitates changes as required, so the SSFF is adept to modifications, maintenance, reconfiguration, and technology evolution.

  6. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  7. 50. Photocopy of copy of original Officers' Duplex Quarters drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photocopy of copy of original Officers' Duplex Quarters drawing by Turner, 7 April 1932 (original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University. Detail of front entrance and of gable dormer - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS

  8. 49. Photocopy of copy of original Officers' Duplex Quarters drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photocopy of copy of original Officers' Duplex Quarters drawing by Turner, 7 April 1932 (original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University). Front, rear, and side elevations, and cross-section - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS

  9. Trustee Quarterly, 1990 (Four Issues).

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1990

    1990-01-01

    This document consists of the four issues of the "Trustee Quarterly" for 1990. This series covers topics of current concern to community college trustees. The winter 1990 issue contains articles examining the pros and cons of board standing committees, the role of boards in planning and institutional effectiveness, innovative fund raising in…

  10. INDIANA READING QUARTERLY, VOLUME A.

    ERIC Educational Resources Information Center

    FARR, ROGER C.; HARRIS, LARRY A.

    THE INDIANA READING QUARTERLY AIMS TO PROVIDE A COMMUNICATION LINK WITH THE VARIOUS LOCAL COUNCILS SCATTERED THROUGHOUT THE STATE. MOST OF THE ARTICLES SHOULD INTEREST INDIANA'S CLASSROOM TEACHERS, SINCE THE JOURNAL'S MAJOR FOCUS IS READING INSTRUCTION IN INDIANA. MOST OF THE ARTICLES WILL BE WRITTEN BY EDUCATORS IN INDIANA. VOLUME A OF THE…

  11. Menus and mnemonics in airway facilities.

    DOT National Transportation Integrated Search

    2003-04-01

    This study examines the use of menus and mnemonics in current Airway Facilities (AF) systems and compares them to human factors : guidelines and best practices. Researchers from the William J. Hughes Technical Center traveled to AF field sites and co...

  12. Electric power quarterly, July--September 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-19

    The Electric Power Quarterly (EPQ) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA). The EPQ is designed to provide energy decisionmakers with accurate and timely generation and fuel cost and quality information on a plant-by-plant basis. This publication is designed for applications by electric utilities, fuel suppliers, consumers, educational institutions, and government in recognition of the importance of energy planning. The EPQ presents monthly summaries of electric utility statistics at the national, Census division, state, company, and plant levels on the following subjects: quantity of fuel; cost of fuel;more » quality of fuel; net generation; fuel consumption, and fuel stocks. In addition, the EPQ presents a quarterly summary of reported major disturbances and unusual occurrences. 1 fig., 15 tabs.« less

  13. Including the Group Quarters Population in the US Synthesized Population Database

    PubMed Central

    Chasteen, Bernadette M.; Wheaton, William D.; Cooley, Philip C.; Ganapathi, Laxminarayana; Wagener, Diane K.

    2011-01-01

    In 2005, RTI International researchers developed methods to generate synthesized population data on US households for the US Synthesized Population Database. These data are used in agent-based modeling, which simulates large-scale social networks to test how changes in the behaviors of individuals affect the overall network. Group quarters are residences where individuals live in close proximity and interact frequently. Although the Synthesized Population Database represents the population living in households, data for the nation’s group quarters residents are not easily quantified because of US Census Bureau reporting methods designed to protect individuals’ privacy. Including group quarters population data can be an important factor in agent-based modeling because the number of residents and the frequency of their interactions are variables that directly affect modeling results. Particularly with infectious disease modeling, the increased frequency of agent interaction may increase the probability of infectious disease transmission between individuals and the probability of disease outbreaks. This report reviews our methods to synthesize data on group quarters residents to match US Census Bureau data. Our goal in developing the Group Quarters Population Database was to enable its use with RTI’s US Synthesized Population Database in the Modeling of Infectious Diseases Agent Study. PMID:21841972

  14. LUX-ZEPLIN (LZ) Technical Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mount, B. J.

    In this Technical Design Report (TDR) we describe the LZ detector to be built at the Sanford Underground Research Facility (SURF). The LZ dark matter experiment is designed to achieve sensitivity to a WIMP-nucleon spin-independent cross section of three times ten to the negative forty-eighth square centimeters.

  15. Monitoring quality of care at dialysis facilities: a case for regulatory parsimony--and beyond.

    PubMed

    Stivelman, John C

    2012-10-01

    With the issuance of the new Conditions for Coverage in 2008 and the implementation of the Prospective Payment System in 2011, the Centers for Medicare & Medicaid Services has fundamentally altered the regulatory landscape of quality in the ESRD program. Although these changes-largely through use of tools comparing individual facility performance to regional and national quality expectations-have increased facility accountability for the quality of patient care in many quarters, they have also complicated both substance and process of facility adherence to quality rules in that component of the program. This editorial critically assesses the main quality tools now in use for dialysis facilities and reviews the issues arising from their conjoint use. A scheme for improving the effectiveness of each quality tool is proposed, and an assessment of their future value and effectiveness in quality improvement is offered.

  16. 2nd Quarter Transportation Report FY 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, L.

    2014-07-01

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which includemore » the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.« less

  17. Savannah River Plant engineering and design history. Volume 4: 300/700 Areas & general services and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1957-01-01

    The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Wastemore » Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.« less

  18. Descriptive analysis of context evaluation instrument for technical oral presentation skills evaluation: A case study in English technical communication course

    NASA Astrophysics Data System (ADS)

    Mohamed, Abdullah-Adnan; Asmawi, Adelina; Hamid, Mohd Rashid Ab; Mustafa, Zainol bin

    2015-02-01

    This paper reports a pilot study of Context Evaluation using a self-developed questionnaire distributed among engineering undergraduates at a university under study. The study aims to validate the self-developed questionnaires used in the Context evaluation, a component in the CIPP Model. The Context evaluation assesses background information for needs, assets, problems and opportunities relevant to beneficiaries of the study in a defined environment. Through the questionnaire, background information for the assessment of needs, assets and problems related to the engineering undergraduates' perceptions on the teaching and learning of technical oral presentation skills was collected and analysed. The questionnaire was developed using 5-points Likert scale to measure the constructs under study. They were distributed to 100 respondents with 79 returned. The respondents consisted of engineering undergraduates studied at various faculties at one technical university in Malaysia. The descriptive analysis of data for each item which makes up the construct for Context evaluation is found to be high. This implied that engineering undergraduates showed high interest in teaching and learning of technical oral presentation skills, thus their needs are met. Also, they agreed that assets and facilities are conducive to their learning. In conclusion, the context evaluation involving needs and assets factors are both considerably important; their needs are met and the assets and facilities do support their technical oral presentation skills learning experience.

  19. Gifted Education Press Quarterly, 2002.

    ERIC Educational Resources Information Center

    Fisher, Maurice D., Ed.

    2002-01-01

    These four issues of a quarterly publication for gifted educators and parents of gifted children span winter 2002 through fall 2002. Featured articles include: (1) "Cultivating Courage, Creativity, and Caring" (James T. Webb), which discusses the need to encourage the development of courage and caring, as well as creativity in gifted students; (2)…

  20. English Leadership Quarterly, 2001-2002.

    ERIC Educational Resources Information Center

    Kiernan, Henry, Ed.; Wilcox, Bonita L., Ed.

    2002-01-01

    This 24th volume of "English Leadership Quarterly" contains articles on topics of interest to those in positions of leadership in departments (elementary, secondary, or college) where English is taught. Each issue focuses on a different theme. Articles in Volume 24 Number 1 focus on matters of thinking and are: "A New Way of…