Sample records for facility renovation part

  1. Renovation of the hot press in the Plutonium Experimental Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Congdon, J.W.; Nelson, G.H.

    1990-03-05

    The Plutonium Experimental Facility (PEF) will be used to develop a new fuel pellet fabrication process and to evaluate equipment upgrades. The facility was used from 1978 until 1982 to optimize the parameters for fuel pellet production using a process which was developed at Los Alamos National Laboratory. The PEF was shutdown and essentially abandoned until mid-1987 when the facility renovations were initiated by the Actinide Technology Section (ATS) of SRL. A major portion of the renovation work was related to the restart of the hot press system. This report describes the renovations and modifications which were required to restartmore » the PEF hot press. The primary purpose of documenting this work is to help provide a basis for Separations to determine the best method of renovating the hot press in the Plutonium Fuel Fabrication (PuFF) facility. This report also includes several SRL recommendations concerning the renovation and modification of the PuFF hot press. 4 refs.« less

  2. Conceptual design report: Nuclear materials storage facility renovation. Part 6, Alternatives study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based onmore » current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for material and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This report is organized according to the sections and subsections outlined by Attachment 111-2 of DOE Document AL 4700.1, Project Management System. It is organized into seven parts. This document, Part VI - Alternatives Study, presents a study of the different storage/containment options considered for NMSF.« less

  3. Fabulous Facilities: New Constructions and Renovations.

    ERIC Educational Resources Information Center

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  4. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2014-10-01 2014-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  5. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2013-10-01 2013-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  6. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2012-10-01 2012-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  7. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2011-10-01 2011-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  8. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  9. Facility Focus: Historic Renovations.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Describes the renovation of historic buildings at Rice University (conversion of the Chemistry Building into space for the biophysics and bioengineering departments) and at Princeton University (renovation of the Dial Lodge eating club into a building for the Bendheim Center for Finance). Includes photographs. (EV)

  10. Making the Case for Facility Modernization, Renovation, and Repairs

    ERIC Educational Resources Information Center

    Kwok, Michael

    2009-01-01

    Like homeowners with limited budgets and a long list of repairs, school districts often must make tough choices when it comes to deciding what building systems to modernize, renovate, or repair--or when to build new facilities. With $44 billion now available for states and schools under the American Recovery and Reinvestment Act of 2009, stimulus…

  11. Tribal Child Care Facilities: A Guide to Construction and Renovation

    ERIC Educational Resources Information Center

    US Department of Health and Human Services, 2006

    2006-01-01

    The Personal Responsibility and Work Opportunity Reconciliation Act of 1996 allowed Tribes to use Child Care and Development Fund (CCDF) monies for the construction or renovation of child care facilities. As procedures have been implemented over the years, Tribes and Administration for Children and Families (ACF) Regional Offices have identified a…

  12. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services, quality activities, or administrative costs). (h) A construction or renovation project that... facilities. 98.84 Section 98.84 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... child care services provided by the Tribal Lead Agency as compared to the level of services provided by...

  13. 76 FR 27044 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ..., Repair and Painting, and Pre- Renovation Education Activities in Target Housing and Child Occupied...), and a lead-based paint pre-renovation education program in accordance with section 406(b) of TSCA, 15... renovation and remodeling activities of pre-1978 housing and child-occupied facilities in the State of...

  14. Ready to Renovate

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2008-01-01

    Schools and universities should have a thorough plan that sets priorities for the most pressing facility renovations. With remedial programs, enrichment offerings, recreational activities and extended-year schedules, many school facilities are no longer dormant in the summer months. The increased year-round use of education facilities benefits…

  15. Sensible Guide for Healthier School Renovations

    EPA Pesticide Factsheets

    This booklet provides school administrators, facility managers, staff and the school community with an overview of how to avoid key environmental health hazards and ways to minimize children’s exposures as they prepare for and undergo renovations.

  16. Building Renovation in ARL Libraries. SPEC Kit 97.

    ERIC Educational Resources Information Center

    Hersberger, Rodney M.

    This collection of library documents related to building renovation, by members of the Association of Research Libraries (ARL), contains excerpts from: (1) a plan for upgrading and expanding library facilities at the University of Kansas; (2) a report on storage facilities at Rutgers University; (3) documents presenting the essential remodeling…

  17. 75 FR 13127 - Lead-Based Paint Renovation, Repair and Painting Activities in Target Housing and Child Occupied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-R07-OPPT-2010-0155; FRL-9128-4] Lead-Based Paint Renovation, Repair and Painting Activities in Target Housing and Child Occupied Facilities; State of Iowa. Notice of... target housing and child-occupied facilities: 1. Establish the discipline of lead-safe renovator. 2...

  18. The Lead-Safe Certified Guide to Renovate Right

    MedlinePlus

    ... for information about courses and resources on lead-safe work practices. 1 RENOVAT ING, REPA IRING, OR PA ... child care facility or school. • Always use lead-safe work practices when renovation or repair will disturb painted ...

  19. Maintaining Acceptable Indoor Air Quality during the Renovation of a School. Technical Bulletin.

    ERIC Educational Resources Information Center

    Jacobs, Bruce W.

    Information that school facility personnel can use concerning the potential impacts of renovation projects on indoor air quality (IAQ), along with details of some effective control strategies, are presented. Various kinds of contaminants may be generated by renovations, including volatile and semivolatile organic compounds, dusts and fibers (e.g.,…

  20. Thermal and flow analysis of the Fluor Daniel, Inc., Nuclear Material Storage Facility renovation design (initial 30% effort of Title 1)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steinke, R.G.; Mueller, C.; Knight, T.D.

    1998-03-01

    The computational fluid dynamics code CFX4.2 was used to evaluate steady-state thermal-hydraulic conditions in the Fluor Daniel, Inc., Nuclear Material Storage Facility renovation design (initial 30% of Title 1). Thirteen facility cases were evaluated with varying temperature dependence, drywell-array heat-source magnitude and distribution, location of the inlet tower, and no-flow curtains in the drywell-array vault. Four cases of a detailed model of the inlet-tower top fixture were evaluated to show the effect of the canopy-cruciform fixture design on the air pressure and flow distributions.

  1. Maintaining High-Performance Schools after Construction or Renovation

    ERIC Educational Resources Information Center

    Luepke, Gary; Ronsivalli, Louis J., Jr.

    2009-01-01

    With taxpayers' considerable investment in schools, it is critical for school districts to preserve their community's assets with new construction or renovation and effective facility maintenance programs. "High-performance" school buildings are designed to link the physical environment to positive student achievement while providing such benefits…

  2. The Renovation and Future Capabilities of the Thacher Observatory

    NASA Astrophysics Data System (ADS)

    O'Neill, Katie; Osuna, Natalie; Edwards, Nick; Klink, Douglas; Swift, Jonathan; Vyhnal, Chris; Meyer, Kurt

    2016-01-01

    The Thacher School is in the process of renovating the campus observatory with a new meter class telescope and full automation capabilities for the purpose of scientific research and education. New equipment on site has provided a preliminary site characterization including seeing and V-band sky brightness measurements. These data, along with commissioning data from the MINERVA project (which uses comparable hardware) are used to estimate the capabilities of the observatory once renovation is complete. Our V-band limiting magnitude is expected to be better than 21.3 for a one minute integration time, and we estimate that milli-magnitude precision photometry will be possible for a V=14.5 point source over approximately 5 min timescales. The quick response, autonomous operation, and multi-band photometric capabilities of the renovated observatory will make it a powerful follow-up science facility for exoplanets, eclipsing binaries, near-Earth objects, stellar variability, and supernovae.

  3. The renovation of Madison's Oscar Mayer Theater

    NASA Astrophysics Data System (ADS)

    Myers, Joseph W. A.; Calamia, Paul T.

    2002-05-01

    Originally opened in 1928 as the Capitol Theatre, the Oscar Mayer Theatre in Madison, WI underwent substantial renovation in 1980 to support its current performance program. The theatre is now home to the Madison Symphony and the Madison Opera, and is used for ballet, touring shows, and popular concerts as well. As part of the ongoing Overture Project which will transform the theatre's home, the Madison Civic Center, into the Overture Center, the Oscar Mayer Theatre will be further improved to support its new role. In this paper we will discuss the reasoning behind the upcoming renovation within the context of the Overture Project, we will describe the pending architectural modifications to the theatre, and we will discuss the intended changes in acoustics. Computer modeling results will also be presented for the existing and renovated conditions.

  4. 34 CFR 222.19 - What other statutes and regulations apply to this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...

  5. 34 CFR 222.19 - What other statutes and regulations apply to this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...

  6. 34 CFR 222.19 - What other statutes and regulations apply to this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...

  7. 34 CFR 222.19 - What other statutes and regulations apply to this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...

  8. First Light of the Renovated Thacher Observatory

    NASA Astrophysics Data System (ADS)

    O'Neill, Katie; Yin, Yao; Edwards, Nick; Swift, Jonathan

    2017-01-01

    The Thacher Observatory, originally a collaboration between UCLA (P.I. G. Abell), Caltech, Pomona College, and the Thacher School, was built in the early 1960s. The goal of the facility was to serve as a training ground for undergraduate and graduate students in Los Angeles area colleges and also to provide hands-on technical training and experience for Thacher students. It was the birthplace of the Summer Science Program which continues today at other campuses. The observatory has now been fully renovated and modernized with a new, 0.7m telescope and dome that can be controlled remotely and in an automated manner. Science programs involving accurate and precise photometry have been initiated, and we project that we will be presenting the first scientific results of the renovated observatory at this meeting.

  9. Renovating existing space to meet special needs for outpatient paediatric oncology.

    PubMed

    Rhodes, D A

    1999-01-01

    Many existing hospital buildings are inadequate to meet needs caused by a tremendous shift from inpatient to outpatient care. Expensive diagnostic and treatment facilities must still be shared by inpatients and outpatients, which in many cases makes renovations to existing facilities on site more appealing than new free-standing facilities; However, care must be taken in the planning and design to make sure that existing hospital operations can be maintained throughout this work. St. Jude Children's Research Hospital in Memphis, an internationally acclaimed institution devoted to the research and treatment of catastrophic illnesses in children has experienced a large growth in its outpatients' care due mainly to changes in treatment modalities and the development of more effective cures. The result has been an extreme overcrowding and unpleasant experiences for patient and family due to awkward patient flow and work processes attempting to respond to the inadequate facility conditions. This paper will not only review the planning issues, but will discuss the renovation which will require several phases in order to minimise disruption to the ongoing activities.

  10. Dorm Renovations: To Increase Enrollment or Maintain Status Quo?

    ERIC Educational Resources Information Center

    Stauff, William

    2001-01-01

    Explores South Carolina's Erskine College's planning and decision making process to renovate all seven of its dormitories over three summers. Discusses how the organization built a strong relationship with the contractor, successfully utilized outside architectural and consulting services, applied facilities management techniques in the process,…

  11. Transit Station Renovation: A Case Study of Planning and Design Procedures

    DOT National Transportation Integrated Search

    1979-06-01

    The general techniques and procedures for planning and evaluating transit : interface facilities are applied comprehensively to the problem of station : renovation. The 69th Street Terminal in Philadelphia is evaluated in terms of : its performance i...

  12. Teaching Laboratory Renovation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Zuhairi, Ali Jassim; Al-Dahhan, Wedad; Hussein, Falah

    Scientists at universities across Iraq are actively working to report actual incidents and accidents occurring in their laboratories, as well as structural improvements made to improve safety and security, to raise awareness and encourage openness, leading to widespread adoption of robust Chemical Safety and Security (CSS) practices. The improvement of students’ understanding of concepts in science and its applications, practical scientific skills and understanding of how science and scientists work in laboratory experiences have been considered key aspects of education in science for over 100 years. Facility requirements for the necessary level of safety and security combined with specific requirementsmore » relevant to the course to be conducted dictate the structural design of a particular laboratory, and the design process must address both. This manuscript is the second in a series of five case studies describing laboratory incidents, accidents, and laboratory improvements. We summarize the process used to guide a major renovation of the chemistry instructional laboratory facilities at Al-Nahrain University and discuss lessons learned from the project.« less

  13. Facilities for music education and their acoustical design.

    PubMed

    Koskinen, Heli; Toppila, Esko; Olkinuora, Pekka

    2010-01-01

    Good rehearsal facilities for musicians are essential. Directive 2003/10/EC necessitates that musicians are protected from noise exposure. A code of conduct gives the guidelines how this should be done. This study examines room acoustics recommendations provided by the Finnish code of conduct, and discusses whether they are adequate. Small teaching facilities were measured after renovation and compared to earlier measurements. Teachers' opinions were inquired about the facilities before and after. The renovation did not decrease the noise exposure of the teachers. However, the majority preferred the facilities after the renovation. The Finnish code of conduct is not sufficient for facilities where loud instruments are played, or band practise. Good facilities can be designed but they must be specified at the designing stage for their intended use.

  14. 75 FR 39524 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ..., Repair and Painting, and Pre- Renovation Education Activities in Target Housing and Child Occupied... pre-renovation education program in accordance with section 406(b) of TSCA, 15 U.S.C. 2686(b). This... courses, and to firms and individuals engaged in renovation and remodeling activities of pre-1978 housing...

  15. Summit Renovations, Inc. Information Sheet

    EPA Pesticide Factsheets

    Summit Renovations, Inc. (the Company) is located in Centennial, Colorado. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Denver, Colorado.

  16. Renovation and Expansion of the Caspary Research Building. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grassia, V. L.

    2004-02-07

    Critical to the Hospital's rebuilding efforts have been its public partners at the federal, state, and local government levels who have made a major financial commitment to renovating the Hospital's research infrastructure. To date, the Hospital for Special Surgery (HSS) has been awarded a total of nearly $8.5 million to create and equip new, state-of-the-art laboratories for scientific investigations. The modernization of the Hospital's research facilities was jump-started in 1998 with a $950,000 seed grant from the National Institutes of Health (NIH) to renovate laboratories for immunology research in the Caspary Research Building. Coupled with a matching $5.5 million commitmentmore » from HSS, this infusion of NIH funding laid the groundwork for an overhaul of all of the Hospital's research space.« less

  17. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  18. 75 FR 51808 - Lead-Based Paint Renovation, Repair and Painting Activities in Target Housing and Child Occupied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ... Renovation, Repair and Painting Activities in Target Housing and Child Occupied Facilities; State of Rhode.... These rules already cover all lead-based paint activities that are conducted in target housing and child... in target housing and child-occupied facilities. These rules: 1. Establish the discipline of lead...

  19. FAQs about Facilities: Practical Tips for Planning Renovations and New School Library Media Centers.

    ERIC Educational Resources Information Center

    Lenk, Mary Anne

    2002-01-01

    Answers frequently asked questions (FAQs) related to planning for renovating or building school library media centers (SLMCs). Topics include the role of the school library media specialist, advance planning, importance of a written long-range plan, library consultants, courses on planning, design compromises, planning resources, professional…

  20. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  1. 75 FR 24802 - Lead; Amendment to the Opt-Out and Recordkeeping Provisions in the Renovation, Repair, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... in most pre-1978 housing and child-occupied facilities. In this document, EPA is eliminating the... occupies that no child under age 6 or pregnant women resides in the home and the home is not a child..., the occupant of the building being renovated or the operator of the child-occupied facility. In...

  2. Health outcomes and green renovation of affordable housing.

    PubMed

    Breysse, Jill; Jacobs, David E; Weber, William; Dixon, Sherry; Kawecki, Carol; Aceti, Susan; Lopez, Jorge

    2011-01-01

    This study sought to determine whether renovating low-income housing using "green" and healthy principles improved resident health and building performance. We investigated resident health and building performance outcomes at baseline and one year after the rehabilitation of low-income housing using Enterprise Green Communities green specifications, which improve ventilation; reduce moisture, mold, pests, and radon; and use sustainable building products and other healthy housing features. We assessed participant health via questionnaire, provided Healthy Homes training to all participants, and measured ventilation, carbon dioxide, and radon. Adults reported statistically significant improvements in overall health, asthma, and non-asthma respiratory problems. Adults also reported that their children's overall health improved, with significant improvements in non-asthma respiratory problems. Post-renovation building performance testing indicated that the building envelope was tightened and local exhaust fans performed well. New mechanical ventilation was installed (compared with no ventilation previously), with fresh air being supplied at 70% of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers standard. Radon was < 2 picocuries per liter of air following mitigation, and the annual average indoor carbon dioxide level was 982 parts per million. Energy use was reduced by 45% over the one-year post-renovation period. We found significant health improvements following low-income housing renovation that complied with green standards. All green building standards should include health requirements. Collaboration of housing, public health, and environmental health professionals through integrated design holds promise for improved health, quality of life, building operation, and energy conservation.

  3. Health Outcomes and Green Renovation of Affordable Housing

    PubMed Central

    Breysse, Jill; Jacobs, David E.; Weber, William; Dixon, Sherry; Kawecki, Carol; Aceti, Susan; Lopez, Jorge

    2011-01-01

    Objective This study sought to determine whether renovating low-income housing using “green” and healthy principles improved resident health and building performance. Methods We investigated resident health and building performance outcomes at baseline and one year after the rehabilitation of low-income housing using Enterprise Green Communities green specifications, which improve ventilation; reduce moisture, mold, pests, and radon; and use sustainable building products and other healthy housing features. We assessed participant health via questionnaire, provided Healthy Homes training to all participants, and measured ventilation, carbon dioxide, and radon. Results Adults reported statistically significant improvements in overall health, asthma, and non-asthma respiratory problems. Adults also reported that their children's overall health improved, with significant improvements in non-asthma respiratory problems. Post-renovation building performance testing indicated that the building envelope was tightened and local exhaust fans performed well. New mechanical ventilation was installed (compared with no ventilation previously), with fresh air being supplied at 70% of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers standard. Radon was <2 picocuries per liter of air following mitigation, and the annual average indoor carbon dioxide level was 982 parts per million. Energy use was reduced by 45% over the one-year post-renovation period. Conclusions We found significant health improvements following low-income housing renovation that complied with green standards. All green building standards should include health requirements. Collaboration of housing, public health, and environmental health professionals through integrated design holds promise for improved health, quality of life, building operation, and energy conservation. PMID:21563714

  4. 45 CFR 1309.10 - Applications for the purchase, construction and major renovation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Applications for the purchase, construction and... RENOVATION AND CONSTRUCTION Application Procedures § 1309.10 Applications for the purchase, construction and... description of the rooms, and the lot on which the building is located or will be located (including the space...

  5. 45 CFR 1309.10 - Applications for the purchase, construction and major renovation of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Applications for the purchase, construction and... RENOVATION AND CONSTRUCTION Application Procedures § 1309.10 Applications for the purchase, construction and... description of the rooms, and the lot on which the building is located or will be located (including the space...

  6. 45 CFR 1309.10 - Applications for the purchase, construction and major renovation of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Applications for the purchase, construction and... RENOVATION AND CONSTRUCTION Application Procedures § 1309.10 Applications for the purchase, construction and... description of the rooms, and the lot on which the building is located or will be located (including the space...

  7. 45 CFR 1309.10 - Applications for the purchase, construction and major renovation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Applications for the purchase, construction and... RENOVATION AND CONSTRUCTION Application Procedures § 1309.10 Applications for the purchase, construction and... description of the rooms, and the lot on which the building is located or will be located (including the space...

  8. 45 CFR 1309.10 - Applications for the purchase, construction and major renovation of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Applications for the purchase, construction and... RENOVATION AND CONSTRUCTION Application Procedures § 1309.10 Applications for the purchase, construction and... description of the rooms, and the lot on which the building is located or will be located (including the space...

  9. Asbestos exposure during home renovation in New South Wales.

    PubMed

    Park, Eun-Kee; Yates, Deborah H; Hyland, Rebecca A; Johnson, Anthony R

    2013-09-16

    Asbestos exposure is causally associated with the development of malignant mesothelioma (MM), which is increasingly being reported after exposure to asbestos fibro sheeting in Australia. In this study, we investigate self-reported non-occupational asbestos exposure during home renovation in New South Wales. Cross-sectional mailed questionnaire examining renovation activity, tasks undertaken during renovation and self-reported exposure to asbestos among respondents and their family members in NSW between January and June 2008. 10 000 adults aged 18-99 years, randomly selected from the NSW electoral roll. We received 3612 responses, while 365 questionnaires did not reach addressees, giving an overall response rate of 37.5%. Differences in self-reported asbestos exposure between do-it-yourself (DIY) and non-DIY renovators. 1597 participants (44.2%) had renovated their home and among these, 858 participants (53.7%) self-reported as DIY renovators. Of these, 527 (61.4%) reported asbestos exposure during home renovations, 337 (39.3%) reported that their partner had been exposed to asbestos during renovations, and 196 (22.8%) reported that their children had been exposed. More than 20% of renovators planned to further renovate their current homes within the next 5 years. Self-reported asbestos exposure during home renovation is common. This preventable exposure could place adults and children at risk of MM many years into the future. Although such exposure is self-reported and ideally should be verified, this study identifies a potentially important problem in NSW.

  10. 76 FR 56136 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... instructions for each method as provided in Section I of the SUPPLEMENTARY INFORMATION. To ensure proper..., by one of the following methods: 1. http://www.regulations.gov : Follow the on-line instructions for... teach renovation classes, that individuals performing renovation activities are properly trained and...

  11. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  12. Neural Pathway of Renovative and Innovative Products Appreciation.

    PubMed

    Huang, Furong; Chiu, Chiyue; Luo, Jing

    2016-12-12

    According to the level of change an invention makes on existing things and how it overrides people's mental schemas on established categories, new inventions can be classified into two groups: incremental inventions (i.e., renovations), which make minor improvements on existing designs, and radical inventions (i.e., innovations), which make major developments that enable people to do things they have never been able to do before. Although innovation and renovation are two fundamentally different types of creation that feature new changes ranging from those in product development to those in large scale social changes, and people tend to report higher subjective preferences for incremental inventions compared to radical inventions, the cognitive brain mechanisms underlying the mental representation of these two types of inventions remains unknown. Through the use of innovative and renovative designs as materials, we found that relative to non-creative designs, creative (renovative &innovative) designs enhanced memory or association-related activation in the right parahippocampus. In particular, innovations evoked more activation in the conceptual pathway for representing objects than did renovations, whereas renovations evoked more activation in the motor pathway than innovations. These results suggest that operating experiences may provide advantages for understanding and appreciating creative designs.

  13. Interior Renovation.

    ERIC Educational Resources Information Center

    American School & University, 2003

    2003-01-01

    Presents K-12 and college interior renovations considered outstanding in a competition, which judged the most outstanding learning environments at educational institutions nationwide. Jurors spent two days reviewing projects, highlighting concepts and ideas that made them exceptional. For each citation, the article offers information on the firm,…

  14. Neural Pathway of Renovative and Innovative Products Appreciation

    NASA Astrophysics Data System (ADS)

    Huang, Furong; Chiu, Chiyue; Luo, Jing

    2016-12-01

    According to the level of change an invention makes on existing things and how it overrides people’s mental schemas on established categories, new inventions can be classified into two groups: incremental inventions (i.e., renovations), which make minor improvements on existing designs, and radical inventions (i.e., innovations), which make major developments that enable people to do things they have never been able to do before. Although innovation and renovation are two fundamentally different types of creation that feature new changes ranging from those in product development to those in large scale social changes, and people tend to report higher subjective preferences for incremental inventions compared to radical inventions, the cognitive brain mechanisms underlying the mental representation of these two types of inventions remains unknown. Through the use of innovative and renovative designs as materials, we found that relative to non-creative designs, creative (renovative &innovative) designs enhanced memory or association-related activation in the right parahippocampus. In particular, innovations evoked more activation in the conceptual pathway for representing objects than did renovations, whereas renovations evoked more activation in the motor pathway than innovations. These results suggest that operating experiences may provide advantages for understanding and appreciating creative designs.

  15. Neural Pathway of Renovative and Innovative Products Appreciation

    PubMed Central

    Huang, Furong; Chiu, Chiyue; Luo, Jing

    2016-01-01

    According to the level of change an invention makes on existing things and how it overrides people’s mental schemas on established categories, new inventions can be classified into two groups: incremental inventions (i.e., renovations), which make minor improvements on existing designs, and radical inventions (i.e., innovations), which make major developments that enable people to do things they have never been able to do before. Although innovation and renovation are two fundamentally different types of creation that feature new changes ranging from those in product development to those in large scale social changes, and people tend to report higher subjective preferences for incremental inventions compared to radical inventions, the cognitive brain mechanisms underlying the mental representation of these two types of inventions remains unknown. Through the use of innovative and renovative designs as materials, we found that relative to non-creative designs, creative (renovative &innovative) designs enhanced memory or association-related activation in the right parahippocampus. In particular, innovations evoked more activation in the conceptual pathway for representing objects than did renovations, whereas renovations evoked more activation in the motor pathway than innovations. These results suggest that operating experiences may provide advantages for understanding and appreciating creative designs. PMID:27941936

  16. Effects of pasture renovation on hydrology, nutrient runoff, and forage yield.

    PubMed

    de Koff, J P; Moore, P A; Formica, J; Van Eps, M; DeLaune, P B

    2011-01-01

    Proper pasture management is important in promoting optimal forage growth and reducing runoff and nutrient loss. Pasture renovation is a management tool that improves aeration by mechanically creating holes or pockets within the soil. Pasture renovation was performed before manure application (poultry litter or swine slurry) on different pasture soils and rainfall simulations were conducted to identify the effects of pasture renovation on nutrient runoff and forage growth. Renovation of small plots resulted in significant and beneficial hydrological changes. During the first rainfall simulation, runoff volumes were 45 to 74% lower for seven out of eight renovated treatments, and infiltration rates increased by 3 to 87% for all renovated treatments as compared with nonrenovated treatments. Renovation of pasture soils fertilized with poultry litter led to significant reductions in dissolved reactive P (DRP) (74-87%), total P (TP) (76-85%), and total nitrogen (TN) (72-80%) loads in two of the three soils studied during the first rainfall simulation. Renovation did not result in any significant differences in forage yields. Overall, beneficial impacts of renovation lasted up to 3 mo, the most critical period for nutrient runoff following manure application. Therefore, renovation could be an important best management practice in these areas.

  17. Reconstructing School Renovation: A Study of the Renovation of Johnson-Williams Middle School, Berryville, Virginia. Building Blocks to Better Learning Series, Volume Six.

    ERIC Educational Resources Information Center

    Tuttle, James B., II

    This document provides a case study of the renovation of Johnson-Williams Middle School in Clarke County, Virginia. Chapter 1, "Planning and Designing a School Renovation," describes considerations for measuring the quality of a school renovation project, including its value to users and its imapct on learning. It summarizes the research…

  18. Increasing incidence of malignant mesothelioma after exposure to asbestos during home maintenance and renovation.

    PubMed

    Olsen, Nola J; Franklin, Peter J; Reid, Alison; de Klerk, Nicholas H; Threlfall, Timothy J; Shilkin, Keith; Musk, Bill

    2011-09-05

    To determine trends in incidence of malignant mesothelioma (MM) caused by exposure to asbestos during home maintenance and renovation. Using the Western Australian Mesothelioma Register, we reviewed all cases of MM diagnosed in WA from 1960 to the end of 2008, and determined the primary source of exposure to asbestos. Categories of exposure were collapsed into seven groups: asbestos miners and millers from Wittenoom; all other asbestos workers; residents from Wittenoom; home maintenance/renovators; other people exposed but not through their occupation; and people with unknown asbestos exposure; or no known asbestos exposure. Latency periods and age at diagnosis for each group were calculated and compared. In WA, 1631 people (1408 men, 223 women) were diagnosed with MM between 1960 and 2008. Since 1981, there have been 87 cases (55 in men) of MM attributed to asbestos exposure during home maintenance and renovation, and an increasing trend in such cases, in both men and women. In the last 4 years of the study (2005-2008), home renovators accounted for 8.4% of all men and 35.7% of all women diagnosed with MM. After controlling for sex and both year and age at diagnosis, the latency period for people exposed to asbestos during home renovation was significantly shorter than that for all other exposure groups, but the shorter follow-up and difficulty recalling when exposure first occurred in this group may partly explain this. MM after exposure to asbestos during home renovation is an increasing problem in WA, and these cases seem to have a shorter latency period than other types of exposure. MM cases related to renovation will probably continue to increase because of the many homes that have contained, and still contain, asbestos building products.

  19. Texas State Support for School Facilities, 1971 to 2001.

    ERIC Educational Resources Information Center

    Clark, Catherine

    2001-01-01

    Reviews 30 years of state efforts to support school-facilities construction and renovation in Texas. Describes recent state programs to provide direct funding for school facilities: Instructional Facilities Allotment, Existing Debt Allotment, and New Instructional Facilities Allotment. Although state funding of school facilities has increased,…

  20. A Descriptive Analysis of the Perspectives of Neville High School's Teachers Regarding the School's Renovation.

    ERIC Educational Resources Information Center

    Dawson, Christella G. B.; Parker, D. Randall

    It has been suggested since the early 80's that America's public schools are not meeting the needs of America's citizenry and that the schools are in need of repair. This paper describes a study conducted at Neville High School (Louisiana) in 1996-1997 and designed to examine the effects of facility renovation on faculty morale. Data collection…

  1. Facilities Spending Criticized as Uneven

    ERIC Educational Resources Information Center

    Greifner, Laura

    2006-01-01

    This article features a report on states and school districts spending almost $600 billion on building and renovating schools from 1995 to 2004, an amount that far exceed earlier expectations. The report also emphasized the uneven facilities spending between minority and affluent districts. Besides receiving the least money for facilities, the…

  2. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sampling technician certification. 745.90 Section 745.90 Protection of Environment ENVIRONMENTAL PROTECTION... RESIDENTIAL STRUCTURES Residential Property Renovation § 745.90 Renovator certification and dust sampling technician certification. (a) Renovator certification and dust sampling technician certification. (1) To...

  3. Creating Standards-Based Technology Education Facilities

    ERIC Educational Resources Information Center

    Daugherty, Michael K.; Klenke, Andrew M.; Neden, Michael

    2008-01-01

    One of the most intimidating tasks faced by new or practicing technology education teachers is the challenge of creating new facilities or renovating current facilities for a new purpose. While the fourth program standard in "Advancing Excellence in Technological Literacy: Student Assessment, Professional Development, and Program Standards (AETL)"…

  4. Amalaco LLC, d/b/a MJM Renovation Information Sheet

    EPA Pesticide Factsheets

    Amalaco LLC, d/b/a MJM Renovation (the Company) is located in St. Louis, Missouri. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in St. Louis, Missouri.

  5. Design Standards for School Art Facilities

    ERIC Educational Resources Information Center

    National Art Education Association, 2015

    2015-01-01

    "Design Standards for School Art Facilities" is an invaluable resource for any school or school district looking to build new facilities for the visual arts or renovate existing ones. Discover detailed information about spaces for the breadth of media used in the visual arts. Photographs illustrate all types of features including…

  6. Air Permeability of Renovation Plasters Evaluated with Torrent’s Method

    NASA Astrophysics Data System (ADS)

    Brasse, Krystian; Tracz, Tomasz

    2017-10-01

    The aim of research was to determine the air permeability of the renovation plasters, using Torrent’s method. The scope of this research included three renovation plaster systems. Each of them was applied on experimental, masonry element and had a different rendering coat. Permeability measurements were performed after 28 days of curing in a natural state. In order to calculate the coefficient of air permeability (kT), the partial data was registered during the measurements. The test results indicate the possibility of determination the coefficient of air permeability kT in relation to the renovation plasters. At the same time results confirm the high porosity of the renovation plasters.

  7. New potentional of high-speed water jet technology for renovating concrete structures

    NASA Astrophysics Data System (ADS)

    Bodnárová, L.; Sitek, L.; Hela, R.; Foldyna, J.

    2011-06-01

    The paper discusses the background and results of research focused on the action of a high-speed water jet on concrete with different qualities. The sufficient and careful removal of degraded concrete layers is very important for the renovation of concrete structures. High-speed water jet technology is one of the most common methods used for removing degraded concrete layers. Different types of high-speed water jets were tested in the experimental part. The classical technology of a single continuous water jet generated with one nozzle was tested as well as the technology of revolving water jets generated by multiple nozzles (used mainly for the renovation of larger areas). A continuous flat water jet and pulsating flat water jet were tested the first time, because the connection of a water jet with the acoustic generator of a pulsating jet offers new possibilities for the use of a water jet (see [1] and [2]). A water jet with such a modification is capable of efficient action and can even be used for cutting solid concrete with a relatively low consumption of energy. A flat pulsating water jet which can be newly used for renovation seems to be a promising technology.

  8. The Effect of Dining Room Physical Environmental Renovations on Person-Centered Care Practice and Residents' Dining Experiences in Long-Term Care Facilities.

    PubMed

    Hung, Lillian; Chaudhury, Habib; Rust, Tiana

    2016-12-01

    This qualitative study evaluated the effect of dining room physical environmental changes on staff practices and residents' mealtime experiences in two units of a long-term care facility in Edmonton, Canada. Focus groups with staff (n = 12) and individual interviews with unit managers (n = 2) were conducted. We also developed and used the Dining Environment Assessment Protocol (DEAP) to conduct a systematic physical environmental evaluation of the dining rooms. Four themes emerged on the key influences of the renovations: (a) supporting independence and autonomy, (b) creating familiarity and enjoyment, (c) providing a place for social experience, and (d) challenges in supporting change. Feedback from the staff and managers provided evidence on the importance of physical environmental features, as well as the integral nature of the role of the physical environment and organizational support to provide person-centered care for residents. © The Author(s) 2015.

  9. Indoor Air Quality of Residential Building Before and After Renovation

    NASA Astrophysics Data System (ADS)

    Sánka, Imrich; Földváry, Veronika

    2017-06-01

    This study investigates the impact of energy renovation on the indoor air quality of an apartment building during the heating season. The study was performed in one residential building before and after its renovation. An evaluation of the indoor air quality was performed using objective measurements and a subjective survey. The concentration of CO2 was measured in the bedrooms, and a sampling of the total volatile compounds (TVOC) was performed in the living rooms of the selected apartments. Higher concentrations of CO2 and TVOC were observed in the residential building after its renovation. The concentrations of CO2, and TVOC in some of the cases exceeded the recommended maximum limits, especially after implementing energy-saving measures on the building. The average air exchange rate was visibly higher before the renovation of the building. The current study indicates that large-scale renovations may reduce the quality of an indoor environment in many apartments, especially in the winter season.

  10. Science Facilities Design Guidelines.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…

  11. Acoustical components of the Orpheum Theatre renovation

    NASA Astrophysics Data System (ADS)

    Conant, David A.

    2002-05-01

    The before and after acoustically-important listening conditions and measurements are described for a $14.2 million restoration and renovation of this 1,400-seat grand 1929 Movie Palace-at one time the tallest building in Phoenix. Great care was taken to restore all the acoustically good parts of the original design and to subtly modify the acoustically-troublesome parts (including severely focusing dome and sidewalls) so they looked the same but performed properly. A beautiful playhouse was achieved in 1997 with fine, fixed acoustics and conventional audio reinforcement, a surrounding Italian village, plenty of gilt, moving clouds and sunsets overhead. Today, the venue successfully hosts shows from performance art to ballet to jazz. It was not intended (acoustically) to serve classical music but does so on occasion.

  12. The CABRI fast neutron Hodoscope: Renovation, qualification program and first results following the experimental reactor restart

    NASA Astrophysics Data System (ADS)

    Chevalier, V.; Mirotta, S.; Guillot, J.; Biard, B.

    2018-01-01

    The CABRI experimental pulse reactor, located at the Cadarache nuclear research center, southern France, is devoted to the study of Reactivity Initiated Accidents (RIA). For the purpose of the CABRI International Program (CIP), managed and funded by IRSN, in the framework of an OECD/NEA agreement, a huge renovation of the facility has been conducted since 2003. The Cabri Water Loop was then installed to ensure prototypical Pressurized Water Reactor (PWR) conditions for testing irradiated fuel rods. The hodoscope installed in the CABRI reactor is a unique online fuel motion monitoring system, operated by IRSN and dedicated to the measurement of the fast neutrons emitted by the tested rod during the power pulse. It is one of the distinctive features of the CABRI reactor facility, which is operated by CEA. The system is able to determine the fuel motion, if any, with a time resolution of 1 ms and a spatial resolution of 3 mm. The hodoscope equipment has been upgraded as well during the CABRI facility renovation. This paper presents the main outcomes achieved with the hodoscope since October 2015, date of the first criticality of the CABRI reactor in its new Cabri Water Loop configuration. Results obtained during reactor commissioning phase functioning, either in steady-state mode (at low and high power, up to 23 MW) or in transient mode (start-up, possibly beyond 20 GW), are discussed.

  13. A BIM-based system for demolition and renovation waste estimation and planning.

    PubMed

    Cheng, Jack C P; Ma, Lauren Y H

    2013-06-01

    Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry

  14. Financing Public School Facilities in Texas: A Case Study.

    ERIC Educational Resources Information Center

    Dawn, Lisa

    A case study is presented of a Texas educational facilities program that was developed to provide long-term state assistance to school districts for the construction or renovation of their facilities by providing equal access to revenue for the specific purpose of repaying debt issued to finance instructional facilities. This report presents a…

  15. Understanding Functional Adequacy and Facility Condition for Strategic Decision Making

    ERIC Educational Resources Information Center

    Dufresne, Ray

    2012-01-01

    At colleges and universities today, the increasing number of students is putting new pressure on facilities--and on facility staff. Student needs are also increasingly different, and most campus facilities have not kept up with the changing times. Facilities are expensive to build, maintain, and renovate, and costs are on the rise. Funds for…

  16. Energy Efficiency in Water and Wastewater Facilities

    EPA Pesticide Factsheets

    Learn how water and wastewater facilities can lead by example and achieve multiple benefits by improving energy efficiency of their new, existing, and renovated buildings and their day-to-day operations.

  17. Impact of park renovations on park use and park-based physical activity.

    PubMed

    Cohen, Deborah A; Han, Bing; Isacoff, Jennifer; Shulaker, Bianca; Williamson, Stephanie; Marsh, Terry; McKenzie, Thomas L; Weir, Megan; Bhatia, Rajiv

    2015-02-01

    Given the concerns about low rates of physical activity among low-income minority youth, many community-based organizations are investing in the creation or renovation of public parks to encourage youth to become more physically active. To what degree park renovations accomplish this goal is not known. We used the System for Observing Play and Recreation in Communities (SOPARC) to measure park users and their physical activity levels before and after 2 parks were renovated. We compared findings with 4 parks: 2 that were unrenovated parks and 2 that were undergoing renovation. We also surveyed park users and local residents about their use of the parks. Compared with parks that had not yet been renovated, the improved parks saw more than a doubling in the number of visitors and a substantial increase in energy expended in the parks. Increased park use was pronounced in adults and children, but was not seen in teens and seniors. Park renovations were associated with a significantly increased perception of park safety. Park improvements can have a significant impact on increasing park use and local physical activity.

  18. Revised Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule

    EPA Pesticide Factsheets

    This is the revised version of the Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule.

  19. Technical Assistance for Arts Facilities: A Sourcebook. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…

  20. Where to Start when Previous Facilities Data are Questionable

    ERIC Educational Resources Information Center

    Watt, Catherine E.; Higerd, Thomas B.; Valcik, Nicolas A.

    2007-01-01

    Academic leaders and governing boards are increasingly aware of the importance and difficulty in managing physical plants as finite resources. In addition, the finances needed to renovate or build facilities have become severely constrained. The National Science Foundation (2000), in its survey of research facilities, suggests that research space…

  1. Impact of Park Renovations on Park Use and Park-based Physical Activity

    PubMed Central

    Cohen, Deborah A; Han, Bing; Isacoff, Jennifer; Shulaker, Bianca; Williamson, Stephanie; Marsh, Terry; McKenzie, Thomas L.; Weir, Megan; Bhatia, Rajiv

    2015-01-01

    Background Given the concerns about low rates of physical activity among low-income minority youth, many community based organizations are investing in the creation or renovation of public parks, in order to encourage youth to become more physically active. To what degree park renovations accomplish this goal is not known. Methods We used the System for Observing Play and Recreation in Communities (SOPARC), to measure park users and their physical activity levels before and after two parks were renovated. We compared findings to 4 parks-- 2 that were unrenovated parks and 2 that were undergoing renovation. We also surveyed parks users and local residents about their use of the parks. Results Compared to parks that had not yet been renovated, the improved parks saw more than a doubling in the number of visitors and a substantial increase in energy expended in the parks. Increased park use was pronounced in adults and children, but was not seen in teens and seniors. Park renovations were associated with a significantly increased perception of park safety. Conclusions Park improvements can have a significant impact on increasing park use and local physical activity. PMID:24956608

  2. North Carolina Public Schools Facility Standards. A Guide for Planning School Facilities.

    ERIC Educational Resources Information Center

    Knott, Gerald H.; Lora, James M.; Acker, Marjorie L.; Taynton, Steven; Logan, Gladys B.; Harrell, Ronald C.

    The State of North Carolina has developed a planning guide for those in the process of building, enlarging, or renovating school facilities. This guide defines and describes the educational spaces needed to support a modern, comprehensive educational program and sets minimal standards for the types and sizes of spaces required. It serves as a…

  3. [Cell renovation in the intestinal epithelium in aging].

    PubMed

    Gusel'nikova, E A; Konovalov, S S; Poliakova, V O; Kvetnoĭ, I M

    2010-01-01

    The ability to cell renovation of two basic cell types of intestinal mucosa is the important mechanism for the regulation and support of the gut physiological functions in aging and under the influence of the ecological negative factors. The study of the processes of cell renovation of the intestinal epithelial and neuroendocrine cells in physiological and radiological aging has a great interest, because the irradiation in the subletal doses could be considered as the model of artificial aging, and this fact enables studying of the radiological influence as the ecological factor, promoting the aging. In this study, the increase of cell proliferation in intestinal mucosa in physiological as well as artificial aging was observed. It was shown, that the total population of mitotic cells increases two times. These data testify about active participation of the mechanisms of cell renovation in the safety of gut functions during aging.

  4. Iraqi Army Facilities Under the Iraq Security Forces Fund, Diyanah and Debecha, Iraq

    DTIC Science & Technology

    2008-01-17

    reinforcement bars and cast each building’s roof flatwork and horizontal beams to complete the structural aspects of the roof system . Steel header...included a mix of new construction and renovation of existing structures and facilities. The Statement of Requirements and Specifications provided...that renovation of existing structures , when possible, was preferred. In addition, the United States government encouraged the contractor to use

  5. 77 FR 74472 - Application to Export Electric Energy; Energia Renovable S.C., LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Renovable S.C., LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Energia Renovable S.C., LLC (Energia Renovable) has applied for authority to transmit....C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C.824a(e...

  6. The contribution of housing renovation to children’s blood lead levels: a cohort study

    PubMed Central

    2013-01-01

    Background Routine renovation of older housing is a risk factor for childhood lead poisoning, but the contribution to children’s blood lead levels is poorly defined for children with lower exposure levels. Methods We examined a prospective cohort of 276 children followed from 6 to 24 months of age. We conducted surveys of renovation activities and residential lead hazards and obtained blood lead level (B-Pb) every six months. We analyzed B-Pb in a repeated measures design using a mixed effects linear model. Results Parent reported interior renovation ranged from 11 to 25% of housing units at the four, 6-month periods. In multivariable analysis, children whose housing underwent interior renovation had a 12% higher mean B-Pb by two years of age compared with children whose housing units were not renovated (p < 0.01). The time between renovation and the child blood lead sample was associated with higher B-Pb (p-value for trend <0.01); compared to children in non-renovated housing, children whose housing units underwent renovation in the prior month had a 17% higher mean B-Pb at two years of age, whereas children whose housing renovation occurred in the prior 2–6 months had an 8% higher mean B-Pb. We also found an association between higher paint lead loading, measured using an X-ray fluorescence (XRF) based paint lead index, and child B-Pb (p = 0.02); for every 10 mg/cm2 increase in paint lead loading index there was a 7.5% higher mean childhood B-Pb. Conclusions In an analysis of data collected before the recent changes to Environmental Protection Agency’s Lead, Renovation, Repair and Painting Rule, routine interior housing renovation was associated with a modest increase in children’s B-Pb. These results are important for the provision of clinical advice, for housing and public health professionals, and for policymakers. PMID:23981571

  7. Energy-efficient Renovation of a Real Estate in AUSTRIA

    NASA Astrophysics Data System (ADS)

    Korjenic, Azra; Vašková, Anna

    2015-11-01

    An action have cities worldwide, due to urbanization. More than 70 percent of people in Europe live in cities, where 70 percent of the energy consumed. Without adequate measures, a rapidly growing city is at risk in by overloading the infrastructure, threats to water, energy, pollution, logistical bottlenecks and lack of housing. This paper describes an energy-efficient renovation or expansion planning a real estate in Vorarlberg, Austria. The settlement was analysed in more detail here, it involves the city Dornbirn- part Shor. The study investigated how to extend this settlement energy efficient and what feed for factors in the assessment.

  8. How To Renovate for Sustainability.

    ERIC Educational Resources Information Center

    Sturgeon, Julie

    2003-01-01

    Suggests ways to renovate buildings with sustainability in mind, with specific tips in the areas of: (1) lights; energy management; (3) walls and roofs; (4) water; and (5) aesthetics. No one thing will make a building sustainable; it is the aggregate that makes it effective. (SLD)

  9. Bethune-Cookman University STEM Research Lab. DOE Renovation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, Herbert W.

    DOE funding was used to renovate 4,500 square feet of aging laboratories and classrooms that support science, engineering, and mathematics disciplines (specifically environmental science, and computer engineering). The expansion of the labs was needed to support robotics and environmental science research, and to better accommodate a wide variety of teaching situations. The renovated space includes a robotics laboratory, two multi-use labs, safe spaces for the storage of instrumentation, modern ventilation equipment, and other “smart” learning venues. The renovated areas feature technologies that are environmentally friendly with reduced energy costs. A campus showcase, the laboratories are a reflection of the University’smore » commitment to the environment and research as a tool for teaching. As anticipated, the labs facilitate the exploration of emerging technologies that are compatible with local and regional economic plans.« less

  10. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN... renovator. (3) Individuals who have successfully completed an accredited lead-based paint inspector or risk... whether components to be affected by the renovation contain lead-based paint. (7) Must have with them at...

  11. Integral evaluation of variants of renovation projects for Moscow city blocks

    NASA Astrophysics Data System (ADS)

    Kotov, Egor; Chulkov, Vitaly; Chulkov, Georgy

    2018-06-01

    The idea of renovation, as a reorganization of the urban area, and the term "renovation" were proposed at the Moscow State University of Civil Engineering at the peak of the period of "spot construction" of the existing town-planning composition of the city of Moscow. The idea was actively supported, and the term "renovation" was actively used in the directive documents and Decrees of the Government of Moscow at that time. Then the idea of " spot construction" was criticized, its popularity and intensity of use decreased significantly. Recently the term "renovation", the content of which is now not associated with the idea of "dotted building" of urban areas, once again acquired relevance in the activities of the Moscow Government in connection with the need to significantly improve the level and quality of life of the population. Renovation is now understood as a complex problem, combining new construction, reconstruction, social and transport aspects of life and work, demolition of buildings and structures that have served their time, handling construction waste and again, as well as organizational and logistical issues of resettlement of Muscovites. The complexity of the coverage of all these aspects of renovation, as a multi-layered and multi-parametrical socio-technical field of activity supposes an examination of the significant diversity of individual characteristics, revealing the degree of their significance and interrelationships, and requires creating new information computer technologies. Their use is able not only to interconnect individual characteristics, to perform diagnostics and monitoring changes in the quantitative values of individual parameters, but also to operate with integral evaluations of the interaction of all the above-mentioned aspects of renovation. Russian construction science pays serious attention to creation and application of models of "folding" of certain parameters and characteristics into integrated comprehensive assessments

  12. Fundraising Basics for Private School Facilities.

    ERIC Educational Resources Information Center

    Roach, Arthur H.

    This report examines the process behind setting up and implementing a "capital campaign," a program for raising money for new or renovated facilities at private K-12 schools. The report briefly covers tax information regarding gifts to institutions, then offers advice for setting up a comprehensive development program, including…

  13. Historic Schools: Renovation vs. Replacement & the Role of a Feasibility Study.

    ERIC Educational Resources Information Center

    National Trust for Historic Preservation, Washington, DC.

    Weighing the pros and cons of renovating a historic neighborhood school or building a new one takes preservation "know-how," experience, and creativity. The potential for renovation is routinely dismissed without full consideration of the facts and long-term implications. Central to this decision-making process is the feasibility study,…

  14. Fundraising Basics for Private School Facilities

    ERIC Educational Resources Information Center

    Roach, Arthur H.

    2009-01-01

    This report examines the process behind setting up and implementing a "capital campaign": a program for raising money for new or renovated facilities at private K-12 schools. The report covers tax information regarding gifts to institutions then offers advice for setting up a comprehensive development program, including fundraising software and…

  15. The Use of UAV in Housing Renovation Identification: A Case Study at Taman Manis 2

    NASA Astrophysics Data System (ADS)

    Mustaffa, A. A.; Hasmori, M. F.; Sarif, A. S.; Ahmad, N. F.; Zainun, N. Y.

    2018-04-01

    Housing industry in Malaysia is growing rapidly due to the increase in population and the arising of economic level of Malaysian people. Most residential houses are built according to the standard residential design that may lead to house renovation by the buyers after purchasing the house. A method of using Unmanned Aerial Vehicle (UAV) monitoring was used to obtain information of the renovated houses directly on-site at Taman Manis 2, Parit Raja, Batu Pahat. Through comparison of image captured by the UAV with the original house plans, we found out that a total of 160 units out of 336 units of houses undergo a renovation process. Surprisingly, 41 units have been renovated illegally which has 40% to 96% of renovation rate. The acquired data were analyzed and can be concluded that the method of using UAVs to obtain information is highly recommended. The study is expected to help Municipal Council to detect improper & illegal renovation by the residents in a residential area.

  16. Renovating "Lycees" in Ile-de-France.

    ERIC Educational Resources Information Center

    PEB Exchange, 1992

    1992-01-01

    Laws that took effect in January 1986 transferred ownership of French upper secondary schools from central government to regional authorities. Describes the use of private, competitive contracts for public building projects in the renovation and maintenance work at one institution. (MLF)

  17. On the Testing of Renovations Inside Historical Opera Houses

    NASA Astrophysics Data System (ADS)

    Fausti, P.; Prodi, N.

    2002-11-01

    Due to the large number of historical opera houses in Italy, many theatres have been renovated in the past, but still more will undergo major restoration in the near future. Unfortunately in this context, the quality and protection of acoustics is rarely considered as an issue of its own. As a consequence, the renovations are hardly ever accompanied by proper scientific and technical support. In this paper, the acoustical impact of works inside the Teatro Municipale "R.Valli" in Reggio Emilia, including the restoration of the main hall and the construction of a new acoustic shell, will be dealt with. Surveys were held in the theatre before renovation and were repeated with identical procedure and instruments after its completion. By means of a comparative analysis of the architectural project and of acoustical data, the impact of major changes in the theatre can be predicted. It is shown that this approach can help in drafting an operational scheme for safeguarding the acoustics of historical opera houses.

  18. Guidelines and Standards for the Technology Infrastructure of 21st Century Educational Facilities.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Office of Facilities Planning.

    New York State Regents directed that new guidelines and "standards" be developed for technology infrastructures in educational facilities in order to assist administrators and educators in planning technology integration during retrofits, renovations, or new construction of educational facilities. This document provides the first draft…

  19. Young Adult Male Satisfaction with Drug & Alcohol Rehabilitation Facilities: Interior Design Implications.

    ERIC Educational Resources Information Center

    Potthoff, Joy K.

    1991-01-01

    Examined young adult male patient (n=18) satisfaction with interior environments of three different in-patient drug and alcohol rehabilitation facilities: renovated Elk's Club; hospital wing; and facility built for drug and alcohol treatment. Findings indicated satisfaction declined over four-week treatment period; familiar objects were missed;…

  20. The Security Factor in School Renovations.

    ERIC Educational Resources Information Center

    Fickes, Michael

    1998-01-01

    Discusses how one Indiana high school used its renovation as an opportunity to reevaluate the school's security design. Security considerations in the building's external and internal environment include lighting, directional signage, parking, access control technology, and issues regarding the use of closed circuit television. (GR)

  1. An assessment of schoolyard renovation strategies to encourage children's physical activity

    PubMed Central

    2011-01-01

    Background Children in poor and minority neighborhoods often lack adequate environmental support for healthy physical development and community interventions designed to improve physical activity resources serve as an important approach to addressing obesity. In Denver, the Learning Landscapes (LL) program has constructed over 98 culturally-tailored schoolyard play spaces at elementary schools with the goal to encourage utilization of play spaces and physical activity. In spite of enthusiasm about such projects to improve urban environments, little work has evaluated their impact or success in achieving their stated objectives. This study evaluates the impacts of LL construction and recency of renovation on schoolyard utilization and the physical activity rates of children, both during and outside of school, using an observational study design. Methods This study employs a quantitative method for evaluating levels of physical activity of individuals and associated environmental characteristics in play and leisure environments. Schools were selected on the basis of their participation in the LL program, the recency of schoolyard renovation, the size of the school, and the social and demographic characteristics of the school population. Activity in the schoolyards was measured using the System for Observing Play and Leisure Activity (SOPLAY), a validated quantitative method for evaluating levels of physical activity of individuals in play and leisure environments. Trained observers collected measurements before school, during school recess, after school, and on weekends. Overall utilization (the total number of children observed on the grounds) and the rate of activity (the percentage of children observed who were physically active) were analyzed. Observations were compared using t-tests and the data were stratified by gender for further analysis. In order to assess the impacts of LL renovation, recently-constructed LL schoolyards were compared to LL schoolyards with

  2. 76 FR 47917 - Lead; Clearance and Clearance Testing Requirements for the Renovation, Repair, and Painting Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... settlement of litigation over certain post- renovation cleaning requirements of the 2008 Lead Renovation... work practice standards for persons performing renovations for compensation in most pre-1978 housing... it to a recognized laboratory for analysis in lieu of using a lead test kit, minor changes to the...

  3. Energy-Efficient Renovation of Educational Buildings

    ERIC Educational Resources Information Center

    Erhorn-Kluttig, Heike; Morck, Ove

    2005-01-01

    Case studies demonstrating energy-efficient renovation of educational buildings collected by the International Energy Agency (IEA) provide information on retrofit technologies, energy-saving approaches and ventilation strategies. Some general findings are presented here along with one case study, Egebjerg School in Denmark, which shows how natural…

  4. Summary: The Need for More Effective Facilities Management.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Comprehensive facilities management is seen as becoming an important factor in higher education. Alternatives to new construction exist in the form of rehabilitation and renovation; deferred maintenance must be addressed and gradually reduced; better use of space must occur through diversion of surplus space, increased utilization, and…

  5. Assessment of Flooring Renovations on African Elephant (Loxodonta africana) Behavior and Glucocorticoid Response

    PubMed Central

    Boyle, Sarah A.; Roberts, Beth; Pope, Brittany M.; Blake, Margaret R.; Leavelle, Stephen E.; Marshall, Jennifer J.; Smith, Andrew; Hadicke, Amanda; Falcone, Josephine F.; Knott, Katrina; Kouba, Andrew J.

    2015-01-01

    Captive African (Loxodonta africana) and Asian (Elephas maximus) elephants can experience foot pathologies and arthritis. As a preventative measure against these pathologies and to alleviate the potential discomfort due to concrete substrates, some zoological institutions have renovated elephant housing to increase the amount of natural or shock-absorbent substrates. The objective of this study was to compare behavioral (diurnal and nocturnal) and glucorticoid (e.g., serum cortisol) responses of three female African elephants before, during, and after renovation to their indoor housing floor to assess whether renovations had short-term effects on the elephants’ behavior and stress physiology. Behavioral data were collected using scan-sampling methods, and activity budgets were constructed for each of the three elephants. In addition, the duration of all lying rest activities were recorded. Weekly serum cortisol concentrations were determined with enzyme immunoassay (EIA). Overall, eating was the most prevalent behavior exhibited outdoors during the day, while resting (either in a lying or standing position) were most common during the indoor, nocturnal periods. Although variation existed among the three elephants, all three females spent significantly more time walking and less time eating during the day after the completion of the renovations. The extent to which the three elephants exhibited nocturnal lying rest behavior varied among the elephants, with the oldest elephant exhibiting the least amount (an average of 13.2 ± 2.8% of the nightly behavioral scans) compared to the two younger elephants (an average of 34.5 ± 2.1% and 56.6 ± 2.8% of the nightly behavioral scans). There was a significant increase in lying rest behavior for one elephant and standing rest for a second elephant following renovations. Baseline cortisol concentrations prior to renovations were 3.0 ± 0.4 ng/ml, 4.5 ± 0.5 ng/ml, and 4.9 ± 0.5 ng/ml for the three elephants. Cortisol

  6. Home Renovation, Family History of Atopy, and Respiratory Symptoms and Asthma Among Children Living in China

    PubMed Central

    Dong, Guang-Hui; Wang, Jing; Trevathan, Edwin; Liu, Miao-Miao; Wang, Da; Ren, Wan-Hui; Chen, Weiqing; Simckes, Maayan; Zelicoff, Alan

    2014-01-01

    Objectives. To investigate the association of indoor air pollution with the respiratory health of children, we evaluated the associations of children’s respiratory symptoms with asthma and recent home renovation. Methods. We conducted a cross-sectional survey in a school recruitment sample of 31 049 children aged 2 to 14 years in 25 districts of 7 cities of northeast China in 2008–2009. The children’s parents completed standardized questionnaires characterizing the children’s histories of respiratory symptoms and illness, recent home renovation information, and other associated risk factors. Results. The effects of home renovation in the past 2 years were significantly associated with cough, phlegm, current wheeze, doctor-diagnosed asthma, and current asthma. The associations we computed when combining the status of home renovation and family history of atopy were higher than were those predicted from the combination of the separate effects. However, the interactions between home renovation and family history of atopy on a multiplicative scale were not statistically significant (P > .05). Conclusions. Home renovation is associated with increases in the prevalence of respiratory symptoms and asthma in children. The effects of different renovation materials on child respiratory health should be studied further. PMID:24228648

  7. Effects of Full-Scale Beach Renovation on Fecal Indicator Levels in Shoreline Sand and Water

    PubMed Central

    Hernandez, Rafael J.; Hernandez, Yasiel; Jimenez, Nasly H.; Piggot, Alan M.; Klaus, James S.; Feng, Zhixuan; Reniers, Ad; Solo-Gabriele, Helena M.

    2013-01-01

    Recolonization of enterococci, at a non-point source beach known to contain high background levels of bacteria, was studied after a full-scale beach renovation project. The renovation involved importation of new exogenous sand, in addition to infrastructure improvements. The study's objectives were to document changes in sand and water quality and to evaluate the relative contribution of different renovation activities towards these changes. These objectives were addressed: by measuring enterococci levels in the sand and fecal indicator bacteria levels (enterococci and fecal coliform) in the water, by documenting sediment characteristics (mineralogy and biofilm levels), and by estimating changes in observable enterococci loads. Analysis of enterococci levels on surface sand and within sediment depth cores were significantly higher prior to beach renovation (6.3 to 72 CFU/g for each sampling day) when compared to levels during and after beach renovation (0.8 CFU/g to 12 CFU/g) (p<0.01). During the renovation process, sand enterococci levels were frequently below detection limits (<0.1 CFU/g). For water, exceedances in the regulatory thresholds that would trigger a beach advisory decreased by 40% for enterococci and by 90% for fecal coliform. Factors that did not change significantly between pre- and post- renovation included the enterococci loads from animals (approx. 3 × 1011 CFU per month). Factors that were observed to change between pre- and post- renovation activities included: the composition of the beach sand (64% versus 98% quartz, and a significant decrease in biofilm levels) and loads from direct stormwater inputs (reduction of 3 × 1011 CFU per month). Overall, this study supports that beach renovation activities contributed to improved sand and water quality resulting in a 50% decrease of observable enterococci loads due to upgrades to the stormwater infrastructure. Of interest was that the change in the sand mineralogy also coincided with changes in

  8. Effects of full-scale beach renovation on fecal indicator levels in shoreline sand and water.

    PubMed

    Hernandez, Rafael J; Hernandez, Yasiel; Jimenez, Nasly H; Piggot, Alan M; Klaus, James S; Feng, Zhixuan; Reniers, Ad; Solo-Gabriele, Helena M

    2014-01-01

    Recolonization of enterococci, at a non-point source beach known to contain high background levels of bacteria, was studied after a full-scale beach renovation project. The renovation involved importation of new exogenous sand, in addition to infrastructure improvements. The study's objectives were to document changes in sand and water quality and to evaluate the relative contribution of different renovation activities towards these changes. These objectives were addressed: by measuring enterococci levels in the sand and fecal indicator bacteria levels (enterococci and fecal coliform) in the water, by documenting sediment characteristics (mineralogy and biofilm levels), and by estimating changes in observable enterococci loads. Analysis of enterococci levels on surface sand and within sediment depth cores were significantly higher prior to beach renovation (6.3-72 CFU/g for each sampling day) when compared to levels during and after beach renovation (0.8-12 CFU/g) (P < 0.01). During the renovation process, sand enterococci levels were frequently below detection limits (<0.1 CFU/g). For water, exceedances in the regulatory thresholds that would trigger a beach advisory decreased by 40% for enterococci and by 90% for fecal coliform. Factors that did not change significantly between pre- and post- renovation included the enterococci loads from animals (approx. 3 × 10(11) CFU per month). Factors that were observed to change between pre- and post- renovation activities included: the composition of the beach sand (64% versus 98% quartz, and a significant decrease in biofilm levels) and loads from direct stormwater inputs (reduction of 3 × 10(11) CFU per month). Overall, this study supports that beach renovation activities contributed to improved sand and water quality resulting in a 50% decrease of observable enterococci loads due to upgrades to the stormwater infrastructure. Of interest was that the change in the sand mineralogy also coincided with changes in biofilm

  9. Mean-field dynamo action in renovating shearing flows.

    PubMed

    Kolekar, Sanved; Subramanian, Kandaswamy; Sridhar, S

    2012-08-01

    We study mean-field dynamo action in renovating flows with finite and nonzero correlation time (τ) in the presence of shear. Previous results obtained when shear was absent are generalized to the case with shear. The question of whether the mean magnetic field can grow in the presence of shear and nonhelical turbulence, as seen in numerical simulations, is examined. We show in a general manner that, if the motions are strictly nonhelical, then such mean-field dynamo action is not possible. This result is not limited to low (fluid or magnetic) Reynolds numbers nor does it use any closure approximation; it only assumes that the flow renovates itself after each time interval τ. Specifying to a particular form of the renovating flow with helicity, we recover the standard dispersion relation of the α(2)Ω dynamo, in the small τ or large wavelength limit. Thus mean fields grow even in the presence of rapidly growing fluctuations, surprisingly, in a manner predicted by the standard quasilinear closure, even though such a closure is not strictly justified. Our work also suggests the possibility of obtaining mean-field dynamo growth in the presence of helicity fluctuations, although having a coherent helicity will be more efficient.

  10. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  11. Aspinall Courthouse: GSA's Historic Preservation and Net-Zero Renovation Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, R.; Hayter, S.; Hotchkiss, E.

    2014-10-01

    The federal government is mandated with improving efficiency of buildings, incorporating renewable energy, and achieving net-zero energy operations where possible. These challenges led GSA to consider aligning historic preservation renovations with net-zero energy goals. The Wayne N. Aspinall Federal Building and U.S. Courthouse (Aspinall Courthouse), in Grand Junction, Colorado, is an example of a renovation project that aimed to accomplish both historic preservation and net-zero energy goals.

  12. New recreational facilities for the young and the old in Los Angeles: policy and programming implications.

    PubMed

    Cohen, Deborah A; Sehgal, Amber; Williamson, Stephanie; Marsh, Terry; Golinelli, Daniela; McKenzie, Thomas L

    2009-01-01

    It is assumed that higher quality recreation facilities promote physical activity and serve communities better. We tested this assumption by comparing changes in the use of an expanded and renovated skate park (a facility for skateboarding) and a modernized senior citizen's center to two similar facilities that were not refurbished. The skate park was nearly tripled in size, and the senior center was remodeled and received new exercise equipment, a courtyard garden, and modern architectural features. We assessed use of these facilities through direct observation and surveyed both facility users and residents living within 2 miles of each facility. We found that making improvements to facilities alone will not always guarantee increased use. Although there was a 510% increase in use of the expanded skate park compared to a 77% increase in the comparison skate park, the senior center had substantially fewer users and provided fewer hours of exercise classes and other programmed activities after the facility was renovated. The implication of our study is that use results from a complex equation that includes not only higher quality recreation facilities but also progamming, staffing, fees, hours of operation, marketing, outreach, and perhaps a host of other human factors.

  13. Financing Educational Facility Construction: Prevailing Wage Litigation.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    This chapter presents an up-to-date analysis of prevailing state wage laws that affect educational facility construction or renovation and highlights relevant prevailing wage litigation in many states. Currently, 13 states have no prevailing wage laws for public works. The other 37 states and the District of Columbia do have prevailing wage laws…

  14. School Construction Defies Fiscal Doldrums

    ERIC Educational Resources Information Center

    Sack, Joetta L.

    2004-01-01

    This paper constitutes the first of a three part series examining the boom in the construction and renovation of K-12 schools and the continuing challenges that communities face in getting the facilities their students and educators need. Part 1 reports on the increase of school construction and renovation that began in 2002, despite a sagging…

  15. Effects of State Policies on Facilities Planning and Construction in Rural Districts. ERIC Digest.

    ERIC Educational Resources Information Center

    Lawrence, Barbara Kent

    State policies greatly affect the decisions rural districts make about building or renovating school facilities. State, federal, and local mechanisms for funding school facilities are briefly described. Some states require a specific percentage of growth or decline in student population or a minimum number of students as a prerequisite for…

  16. 45 CFR 1309.5 - Eligibility-Major Renovations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Eligibility-Major Renovations. 1309.5 Section 1309.5 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  17. 45 CFR 1309.5 - Eligibility-Major Renovations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Eligibility-Major Renovations. 1309.5 Section 1309.5 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  18. 45 CFR 1309.5 - Eligibility-Major Renovations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Eligibility-Major Renovations. 1309.5 Section 1309.5 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  19. 45 CFR 1309.5 - Eligibility-Major Renovations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Eligibility-Major Renovations. 1309.5 Section 1309.5 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  20. 45 CFR 1309.5 - Eligibility-Major Renovations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Eligibility-Major Renovations. 1309.5 Section 1309.5 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  1. Stocking the Toolbox: Ideas for Successful Facility Management

    ERIC Educational Resources Information Center

    Gadzikowski, Ann

    2005-01-01

    From snow removal to dishwasher repair, from pest control to playground renovations, there are countless demands on a child care director's time and attention. A child care director is required to juggle a wide variety of roles and expectations related to facility management, often with very little training or expertise in this area. Some child…

  2. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  3. Perceived effects of home renovation on independence of physically disabled Koreans living at home.

    PubMed

    Lee, Yeunsook; Park, Jiyoung; Jang, Miseon

    2017-06-06

    This study aims to identify the potential effects of home renovation on independence promotion of physically disabled Koreans living at home. The method of the study is a survey with a questionnaire; subjects are physically disabled people living at home in rural and urban areas in Korea. The Functional Independence Measure was used to measure changes in subjects' levels of independence. It was expected that if homes were renovated according to individual needs, disabled people's independence level would be increased by one or more level compared to their current daily independence level in their existing homes. In particular, independence levels concerning bathing and locomotion, which are low in existing conditions, were expected to increase significantly with renovation. Such effects on independence level were conspicuous for disabled people in rural area. The results prove the positive effects of home renovations of disabled people's independence, thus providing meaningful academic evidence on home renovations for disabled people. Implication for rehabilitation Korea had a culture where support measures to aid the life independence of disabled persons relied heavily on human services, leading to a lack of diversity in support measures. By closing the gap between the resident's disability and the inadequacy in their prevailing environment, house remodeling can be a crucial intervention for improving the independence of disabled persons in their daily lives. Depending on the nature of their disabilities and their residential arrangements, disabled persons have diverse needs regarding home remodeling. Implementing home remodeling in such a manner that suits the resident's needs is crucial to boosting their independence. Because of this, remodeling personnel must interact with residents prior to the renovation while also strengthening their expertise.

  4. Characteristics of Viewers of a Tennessee Agricultural Extension Educational Television Series on Renovating Furniture. A research Summary of a Graduate Study.

    ERIC Educational Resources Information Center

    Dixon, Lois Claudine; And Others

    A study was conducted to investigate certain characteristics of respondents who renovated furniture during a Washington County educational television 19-program series on chair renovation, who had previously renovated furniture, and who planned to renovate a chair following the series, and to compare them with those respondents who had not. Data…

  5. The Size and Scope of Collegiate Athletic Training Facilities and Staffing.

    PubMed

    Gallucci, Andrew R; Petersen, Jeffrey C

    2017-08-01

      Athletic training facilities have been described in terms of general design concepts and from operational perspectives. However, the size and scope of athletic training facilities, along with staffing at different levels of intercollegiate competition, have not been quantified.   To define the size and scope of athletic training facilities and staffing levels at various levels of intercollegiate competition. To determine if differences existed in facilities (eg, number of facilities, size of facilities) and staffing (eg, full time, part time) based on the level of intercollegiate competition.   Cross-sectional study.   Web-based survey.   Athletic trainers (ATs) who were knowledgeable about the size and scope of athletic training programs.   Athletic training facility size in square footage; the AT's overall facility satisfaction; athletic training facility component spaces, including satellite facilities, game-day facilities, offices, and storage areas; and staffing levels, including full-time ATs, part-time ATs, and undergraduate students.   The survey was completed by 478 ATs (response rate = 38.7%) from all levels of competition. Sample means for facilities were 3124.7 ± 4425 ft 2 (290.3 ± 411 m 2 ) for the central athletic training facility, 1013 ± 1521 ft 2 (94 ± 141 m 2 ) for satellite athletic training facilities, 1272 ± 1334 ft 2 (118 ± 124 m 2 ) for game-day athletic training facilities, 388 ± 575 ft 2 (36 ± 53 m 2 ) for athletic training offices, and 424 ± 884 ft 2 (39 ± 82 m 2 ) for storage space. Sample staffing means were 3.8 ± 2.5 full-time ATs, 1.6 ± 2.5 part-time ATs, 25 ± 17.6 athletic training students, and 6.8 ± 7.2 work-study students. Division I schools had greater resources in multiple categories (P < .001). Differences among other levels of competition were not as well defined. Expansion or renovation of facilities in recent years was common, and almost half of ATs reported that upgrades have been approved for

  6. Prototype wash water renovation system integration with government-furnished wash fixture

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The requirements of a significant quantity of proposed life sciences experiments in Shuttle payloads for available wash water to support cleansing operations has provided the incentive to develop a technique for wash water renovation. A prototype wash water waste renovation system which has the capability to process the waste water and return it to a state adequate for reuse in a typical cleansing fixture designed to support life science experiments was investigated. The resulting technology is to support other developments efforts pertaining to water reclamation by serving as a pretreatment step for subsequent reclamation procedures.

  7. 30 CFR 553.10 - What facilities does this part cover?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What facilities does this part cover? 553.10 Section 553.10 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Applicability and Amount of OSFR § 553.10...

  8. 30 CFR 553.10 - What facilities does this part cover?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What facilities does this part cover? 553.10 Section 553.10 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Applicability and Amount of OSFR § 553.10...

  9. 30 CFR 553.10 - What facilities does this part cover?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What facilities does this part cover? 553.10 Section 553.10 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Applicability and Amount of OSFR § 553.10...

  10. Energy Efficiency and Universal Design in Home Renovations - A Comparative Review.

    PubMed

    Kapedani, Ermal; Herssens, Jasmien; Verbeeck, Griet

    2016-01-01

    Policy and societal objectives indicate a large need for housing renovations that both accommodate lifelong living and significantly increase energy efficiency. However, these two areas of research are not yet examined in conjunction and this paper hypothesizes this as a missed opportunity to create better renovation concepts. The paper outlines a comparative review on research in Energy Efficiency and Universal Design in order to find the similarities and differences in both depth and breadth of knowledge. Scientific literature in the two fields reveals a disparate depth of knowledge in areas of theory, research approach, and degree of implementation in society. Universal Design and Energy Efficiency are part of a trajectory of expanding scope towards greater sustainability and, although social urgency has been a driver of the research intensity and approach in both fields, in energy efficiency there is an engineering, problem solving approach while Universal Design has a more sociological, user-focused one. These different approaches are reflected in the way home owners in Energy Efficiency research are viewed as consumers and decision makers whose drivers are studied, while Universal Design treats home owners as informants in the design process and studies their needs. There is an inherent difficulty in directly merging Universal Design and Energy Efficiency at a conceptual level because Energy Efficiency is understood as a set of measures, i.e. a product, while Universal Design is part of a (design) process. The conceptual difference is apparent in their implementation as well. Internationally energy efficiency in housing has been largely imposed through legislation, while legislation directly mandating Universal Design is either non-existent or it has an explicit focus on accessibility. However, Energy Efficiency and Universal Design can be complementary concepts and, even though it is more complex than expected, the combination offers possibilities to advance

  11. 49 CFR Appendix A to Part 37 - Modifications to Standards for Accessible Transportation Facilities

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Facilities A Appendix A to Part 37 Transportation Office of the Secretary of Transportation...—Modifications to Standards for Accessible Transportation Facilities The Department of Transportation, in § 37.9 of this part, adopts as its regulatory standards for accessible transportation facilities the revised...

  12. Indoor air quality in green-renovated vs. non-green low-income homes of children living in a temperate region of US (Ohio).

    PubMed

    Coombs, Kanistha C; Chew, Ginger L; Schaffer, Christopher; Ryan, Patrick H; Brokamp, Cole; Grinshpun, Sergey A; Adamkiewicz, Gary; Chillrud, Steve; Hedman, Curtis; Colton, Meryl; Ross, Jamie; Reponen, Tiina

    2016-06-01

    Green eco-friendly housing includes approaches to reduce indoor air pollutant sources and to increase energy efficiency. Although sealing/tightening buildings can save energy and reduce the penetration of outdoor pollutants, an adverse outcome can be increased buildup of pollutants with indoor sources. The objective of this study was to determine the differences in the indoor air quality (IAQ) between green and non-green homes in low-income housing complexes. In one housing complex, apartments were renovated using green principles (n=28). Home visits were conducted immediately after the renovation, and subsequently at 6 months and at 12 months following the renovation. Of these homes, eight homes had pre-renovation home visits; this allowed pre- and post-renovation comparisons within the same homes. Parallel visits were conducted in non-green (control) apartments (n=14) in a nearby low-income housing complex. The IAQ assessments included PM2.5, black carbon, ultrafine particles, sulfur, total volatile organic compounds (VOCs), formaldehyde, and air exchange rate. Data were analyzed using linear mixed-effects models. None of the indoor pollutant concentrations were significantly different between green and non-green homes. However, we found differences when comparing the concentrations before and after renovation. Measured immediately after renovation, indoor black carbon concentrations were significantly lower averaging 682 ng/m(3) in post-renovation vs. 2364 ng/m(3) in pre-renovation home visits (p=0.01). In contrast, formaldehyde concentrations were significantly higher in post-renovated (0.03 ppm) than in pre-renovated homes (0.01 ppm) (p=0.004). Questionnaire data showed that opening of windows occurred less frequently in homes immediately post-renovation compared to pre-renovation; this factor likely affected the levels of indoor black carbon (from outdoor sources) and formaldehyde (from indoor sources) more than the renovation status itself. To reduce IAQ

  13. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    NASA Astrophysics Data System (ADS)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  14. Validation of cleaning method for various parts fabricated at a Beryllium facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Cynthia M.

    This study evaluated and documented a cleaning process that is used to clean parts that are fabricated at a beryllium facility at Los Alamos National Laboratory. The purpose of evaluating this cleaning process was to validate and approve it for future use to assure beryllium surface levels are below the Department of Energy’s release limits without the need to sample all parts leaving the facility. Inhaling or coming in contact with beryllium can cause an immune response that can result in an individual becoming sensitized to beryllium, which can then lead to a disease of the lungs called chronic berylliummore » disease, and possibly lung cancer. Thirty aluminum and thirty stainless steel parts were fabricated on a lathe in the beryllium facility, as well as thirty-two beryllium parts, for the purpose of testing a parts cleaning method that involved the use of ultrasonic cleaners. A cleaning method was created, documented, validated, and approved, to reduce beryllium contamination.« less

  15. An Investigation into the Relationships between Higher Education Facility Square Footage and Student Enrollments, University Endowments, and Student Tuition

    ERIC Educational Resources Information Center

    Chapman, James David

    2012-01-01

    America's colleges and universities have expanded campus facilities by renovating and increasing square footage. This is in contrast to general construction activity during the same time period. This quantitative study investigates the relationship between university and college campus facility square footage per FTE and university…

  16. Renovation vs. New Construction: Choosing the Right Path

    ERIC Educational Resources Information Center

    Cruickshank, Catherine; Statz, Sam

    2013-01-01

    construction, many district administrators face a fork in the road: renovate or opt for new construction? The importance of this decision should not be taken lightly; it can have serious ramifications for years to come. Each situation is unique. Just as no two students are…

  17. Maintaining Indoor Environmental Quality (IEQ) during Construction and Renovation

    MedlinePlus

    ... and licensed contractors are required to conduct renovation. Biological Materials Chronic dampness from water intrusion leads to ... require special precautions prior to demolition to prevent biological dusts from dispersing in the occupied space. Another ...

  18. Lowell Observatory's 24-inch Clark Refractor: Its History and Renovation

    NASA Astrophysics Data System (ADS)

    Schindler, Kevin; Nye, Ralph; Rosenthal, Peter

    2016-01-01

    In 1895, Percival Lowell hired eminent telescope maker Alvan G. Clark to build a 24-inch refractor. Lowell intended the telescope intitally for observing Mars in support of his controversial theories about life on that planet. Clark finished the telescope within a year and at a cost of $20,000. Lowell and his staff of assistants and astronomers began observing through it on July 23, 1896, setting off a long and productive career for the telescope.While Lowell's Mars studies dominated early work with the Clark, V.M. Slipher by the 1910s was using it to observe planetary rotations and atmospheric compositions. He soon revolutionized spectroscopic studies, gathering excruciatingly long spectra - some in excess of 40 hours - of the so-called white nebula and determining startling radial velocities, evidence of an expanding universe. In the 1960s, scientists and artists teamed up on the Clark and created detailed lunar maps in support of the Apollo program.In recent decades, the Clark has played a central role in the education programs at Lowell, with general public audiences, students, and private groups all taking advantage of this unique resource.With this nearly 120 years of contant use, the Clark had been wearing down in recent years. The telescope was becoming more difficult to move, old electrical wiring in the dome was a fire hazard, and many of the telescope's parts needed to be repaired or replaced.In 2013, Lowell Observatory began a fundraising campaign, collecting $291,000 to cover the cost of dome and telescope renovation. Workers removed the entire telescope mount and tube assembly from the dome, examining every part from tube sections to individuals screws. They also stabilized the dome, adding a water vapor barrier and new outer wall while reinforcing the upper dome. The project lasted from January, 2014 through August, 2015. The facility reopened for daytime tours in September, 2015 and evening viewing the following month.

  19. Interior renovation of a general practitioner office leads to a perceptual bias on patient experience for over one year.

    PubMed

    Gauthey, Jérôme; Tièche, Raphaël; Streit, Sven

    2018-01-01

    Measuring patient experience is key when assessing quality of care but can be biased: A perceptual bias occurs when renovations of the interior design of a general practitioner (GP) office improves how patients assessed quality of care. The aim was to assess the length of perceptual bias and if it could be reproduced after a second renovation. A GP office with 2 GPs in Switzerland was renovated twice within 3 years. We assessed patient experience at baseline, 2 months and 14 months after the first and 3 months after the second renovation. Each time, we invited a sample of 180 consecutive patients that anonymously graded patient experience in 4 domains: appearance of the office; qualities of medical assistants and GPs; and general satisfaction. We compared crude mean scores per domain from baseline until follow-up. In a multivariate model, we adjusted for patient's age, gender and for how long patients had been their GP. At baseline, patients aged 60.9 (17.7) years, 52% females. After the first renovation, we found a regression to the baseline level of patient experience after 14 months except for appearance of the office (p<0.001). After the second renovation, patient experience improved again in appearance of the office (p = 0.008), qualities of the GP (p = 0.008), and general satisfaction (p = 0.014). Qualities of the medical assistant showed a slight improvement (p = 0.068). Results were unchanged in the multivariate model. Interior renovation of a GP office probably causes a perceptual bias for >1 year that improves how patients rate quality of care. This bias could be reproduced after a second renovation strengthening a possible causal relationship. These findings imply to appropriately time measurement of patient experience to at least one year after interior renovation of GP practices to avoid environmental changes influences the estimates when measuring patient experience.

  20. Dormitory renovation project reduces energy use by 69%

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kokayko, M.J.

    1997-06-01

    Baldwin Hall is a three-story, 46,000 ft{sup 2} (4,273 m{sup 1}) dormitory on the campus of Allegheny College in Meadville, Pa. The building was originally built in the 1950s; an additional wing was added in the 1970s so that it has about 37,000 ft{sup 2} (3,437 m{sup 2}). The building contains approximately 100 double-occupancy student rooms; three common bathroom groups per floor; central study, lounge, and computer areas; and a laundry. Design for the renovation started in the winter of 1993; construction took place in the summer of 1994. The major goals of the renovation were: (1) to replace themore » entire building heating system (central boiler plant, distribution piping, and room heating terminals); (2) add a ventilation system within the building; (3) upgrade the building electrical system; (4) provide computer data cabling and cable TV wiring to each room; and, (5) improve room and hallway lighting and finishes.« less

  1. Renovating a 65-year-old performing arts center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gifford, R.S.

    This article describes the HVAC, electrical and lighting systems that were upgraded in the renovations to the Wang Center for the Performing Arts. The renovations and restorations involved a complete restoration to elaborate interior finishes and a comprehensive upgrade of antiquated core mechanical and electrical systems in a 65-year-old performing arts theater. A new thermal storage cooling system, a new electrical power distribution system, new lighting systems and a new fire protection system were accomplished simultaneously as the theater interior was completely refinished with meticulous detail. The project offered a rare opportunity to integrate current technology with what may atmore » first appear to be obsolete systems to enable the original architectural grandeur to be maintained, yet be fully functional to meet the demanding requirements of a modern performing arts center. It is an example of a successful project that was completed within a very aggressive construction schedule and within a controlled budget.« less

  2. Childcare outdoor renovation as a built environment health promotion strategy: evaluating the preventing obesity by design intervention.

    PubMed

    Cosco, Nilda G; Moore, Robin C; Smith, William R

    2014-01-01

    To evaluate the effectiveness of Preventing Obesity by Design (POD), a childcare center outdoor renovation intervention. Pre-post intervention evaluation. North Carolina licensed childcare centers (N = 27). Preschool children. Outdoor renovation, teacher training. Behavior mapping, Preschool Outdoor Environment Measurement Scale (POEMS), center director interview. Descriptive statistics, ordinary least squares and logistic regressions calculated to assess levels of association between environmental change, children's physical activity (PA), social behaviors, and environmental quality. Qualitative interview data analyzed to help understand intervention impact. Behavior mapping showed that site layout attributes, such as the form (i.e., "single loop" and "double loop") of pathways (functioning as circulation routes and wheeled toy settings), are associated with higher levels of PA. Teacher interaction was associated with decreased children's PA. Absence of teacher or lack of child/child interaction was associated with increased PA. POEMS assessment of environmental quality was higher after renovation. POEMS domains (Physical Space and Teacher/Caregiver Roles) were positively associated with PA. After renovation, 68% of center directors reported positive changes in children's behavior and 40% mentioned edible plant installations as greatest success. Built environment renovation of childcare center outdoors, including looped pathways installation, coupled with teacher training, may support increased PA. Renovation, including food gardens, may be a key to success for preschool health promotion and support change in childcare policy.

  3. Resource Book for Furniture Renovation, Refinishing and Reupholstering.

    ERIC Educational Resources Information Center

    Barton, Diane; Robinson, Jay

    This resource book for furniture renovation (refinishing and reupholstering) is one of four resource books developed for use in Code 30 or adult vocational programs in the home furnishings service area. Representative, illustrative, and informative materials contained in the resource book are Furniture Woods, Cuts and Matching Veneers, Wood…

  4. SAR11 lipid renovation in response to phosphate starvation

    PubMed Central

    Carini, Paul; Van Mooy, Benjamin A. S.; Thrash, J. Cameron; White, Angelicque; Zhao, Yanlin; Campbell, Emily O.; Fredricks, Helen F.; Giovannoni, Stephen J.

    2015-01-01

    Phytoplankton inhabiting oligotrophic ocean gyres actively reduce their phosphorus demand by replacing polar membrane phospholipids with those lacking phosphorus. Although the synthesis of nonphosphorus lipids is well documented in some heterotrophic bacterial lineages, phosphorus-free lipid synthesis in oligotrophic marine chemoheterotrophs has not been directly demonstrated, implying they are disadvantaged in phosphate-deplete ecosystems, relative to phytoplankton. Here, we show the SAR11 clade chemoheterotroph Pelagibacter sp. str. HTCC7211 renovates membrane lipids when phosphate starved by replacing a portion of its phospholipids with monoglucosyl- and glucuronosyl-diacylglycerols and by synthesizing new ornithine lipids. Lipid profiles of cells grown with excess phosphate consisted entirely of phospholipids. Conversely, up to 40% of the total lipids were converted to nonphosphorus lipids when cells were starved for phosphate, or when growing on methylphosphonate. Cells sequentially limited by phosphate and methylphosphonate transformed >75% of their lipids to phosphorus-free analogs. During phosphate starvation, a four-gene cluster was significantly up-regulated that likely encodes the enzymes responsible for lipid renovation. These genes were found in Pelagibacterales strains isolated from a phosphate-deficient ocean gyre, but not in other strains from coastal environments, suggesting alternate lipid synthesis is a specific adaptation to phosphate scarcity. Similar gene clusters are found in the genomes of other marine α-proteobacteria, implying lipid renovation is a common strategy used by heterotrophic cells to reduce their requirement for phosphorus in oligotrophic habitats. PMID:26056292

  5. Technological renovation of thermal power plants as a long-term check factor of electricity price growth

    NASA Astrophysics Data System (ADS)

    Veselov, F. V.; Novikova, T. V.; Khorshev, A. A.

    2015-12-01

    The paper focuses on economic aspects of the Russian thermal generation sector's renovation in a competitive market environment. Capabilities of the existing competitive electricity and capacity pricing mechanisms, created during the wholesale market reform, to ensure the wide-scale modernization of thermal power plants (TPPs) are estimated. Some additional stimulating measures to focus the investment process on the renovation of the thermal generation sector are formulated, and supplementing and supporting costs are assessed. Finally, the systemic effect of decelerating wholesale electricity prices caused by efficiency improvements at thermal power plants is analyzed depending on the scales of renovation and fuel prices.

  6. Renovation of a mechanical engineering senior design class to an industry-tied and team-oriented course

    NASA Astrophysics Data System (ADS)

    Liu, Yucheng

    2017-11-01

    In this work, an industry-based and team-oriented education model was established based on a traditional mechanical engineering (ME) senior design class in order to better prepare future engineers and leaders so as to meet the increasing demand for high-quality engineering graduates. In the renovated curriculum, industry-sponsored projects became the most important course component and critical assessment tool, from which problem-solving skills as well as employability skills of the ME students can be fully developed. Hands-on experiences in finite element analysis (FEA) modelling and simulation were also added into the renovated curriculum to promote the application of FEA on engineering design and assessment. Evaluation of the renovated course was conducted using two instruments and the results have shown that the course made the ME senior students more prepared for their future career and a win-win model was created between the industry partner and the ME programme through it. Impact of the renovated syllabus on Accreditation Board for Engineering Technology goals was discussed. Based on the current progress, a more substantial change is being planned to further improve the effectiveness and practicability of this design course. The renovated course was started to offer to the ME senior students at Mississippi State University.

  7. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  8. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  9. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  10. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  11. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  12. Interior renovation of a general practitioner office leads to a perceptual bias on patient experience for over one year

    PubMed Central

    2018-01-01

    Introduction Measuring patient experience is key when assessing quality of care but can be biased: A perceptual bias occurs when renovations of the interior design of a general practitioner (GP) office improves how patients assessed quality of care. The aim was to assess the length of perceptual bias and if it could be reproduced after a second renovation. Methods A GP office with 2 GPs in Switzerland was renovated twice within 3 years. We assessed patient experience at baseline, 2 months and 14 months after the first and 3 months after the second renovation. Each time, we invited a sample of 180 consecutive patients that anonymously graded patient experience in 4 domains: appearance of the office; qualities of medical assistants and GPs; and general satisfaction. We compared crude mean scores per domain from baseline until follow-up. In a multivariate model, we adjusted for patient’s age, gender and for how long patients had been their GP. Results At baseline, patients aged 60.9 (17.7) years, 52% females. After the first renovation, we found a regression to the baseline level of patient experience after 14 months except for appearance of the office (p<0.001). After the second renovation, patient experience improved again in appearance of the office (p = 0.008), qualities of the GP (p = 0.008), and general satisfaction (p = 0.014). Qualities of the medical assistant showed a slight improvement (p = 0.068). Results were unchanged in the multivariate model. Conclusions Interior renovation of a GP office probably causes a perceptual bias for >1 year that improves how patients rate quality of care. This bias could be reproduced after a second renovation strengthening a possible causal relationship. These findings imply to appropriately time measurement of patient experience to at least one year after interior renovation of GP practices to avoid environmental changes influences the estimates when measuring patient experience. PMID:29462196

  13. Influence of Schoolyard Renovations on Children's Physical Activity: The Learning Landscapes Program

    PubMed Central

    Nigg, Claudio R.; M. R. Lampe, Sarah; Kingston, Beverly A.; Mootz, Andrew L.; van Vliet, Willem

    2010-01-01

    Objectives. We examined whether schoolyard improvements led to increased physical activity levels among both boys and girls and assessed the aspects of schoolyard design that have an impact on physical activity. Methods. In a quasi-experimental research design, 6 schools with renovated schoolyards and 3 control schools were divided into activity areas. We calculated measures of children's physical activity by area during school hours as well as after-school hours. Results. The volume of schoolyard use was significantly higher at schools with renovated schoolyards than at control schools, and students were significantly more active at these schools. Also, activity levels were significantly higher among both boys and girls in certain schoolyard areas, such as those with soft surfaces. Conclusions. Because few public elementary schools in the United States provide daily physical education or its equivalent for all students throughout the school year, noncurriculum approaches to increasing children's physical activity are important. Renovated schoolyards increase the number of children who are physically active, as well as their overall activity levels, and reduce sedentary behaviors. PMID:20634465

  14. 49 CFR Appendix E to Part 599 - Disposal Facility Certification Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Disposal Facility Certification Form E Appendix E to Part 599 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Facility Certification Form ER05AU09.020 ER05AU09.021 ER05AU09.022 [74 FR 38976, Aug. 5, 2009] ...

  15. The Effects of an Education Program on Home Renovation for Fall Prevention of Korean Older People

    ERIC Educational Resources Information Center

    Jang, Miseon; Lee, Yeunsook

    2015-01-01

    This study aims to verify the effects of an education program on home renovation for fall prevention among older people, more specifically fall efficacy and home renovation intentions. A quasiexperimental study with nonequivalent control and comparative groups was conducted to demonstrate the effects of the education. A total of 51 older people…

  16. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property... Certification Re-certification (every 5 years see 40 CFR 745.89(b)) Firm $300 $300 Combined Renovation and Lead-based Paint Activities Firm Application $550 $550 Combined Renovation and Lead-based Paint Activities...

  17. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property... Certification Re-certification (every 5 years see 40 CFR 745.89(b)) Firm $300 $300 Combined Renovation and Lead-based Paint Activities Firm Application $550 $550 Combined Renovation and Lead-based Paint Activities...

  18. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property... Certification Re-certification (every 5 years see 40 CFR 745.89(b)) Firm $300 $300 Combined Renovation and Lead-based Paint Activities Firm Application $550 $550 Combined Renovation and Lead-based Paint Activities...

  19. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property... Certification Re-certification (every 5 years see 40 CFR 745.89(b)) Firm $300 $300 Combined Renovation and Lead-based Paint Activities Firm Application $550 $550 Combined Renovation and Lead-based Paint Activities...

  20. Title I, Part B, Institutionalized Facilities Program, Summer 1982. Annual Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This 1982 summer Title I, Part B, Institutionalized Facilities Program provided supplementary career instruction to 188 students residing in facilities for neglected and delinquent children and youth. This report briefly describes the program, providing information on methodology, physical setting, equipment, and supplies; population and class…

  1. The Impact of School Facility Construction and Renovation on Academic Achievement in Texas

    ERIC Educational Resources Information Center

    Holmes, Shannon J.

    2011-01-01

    The purpose of this study was to explore the possible relationship between school facility conditions and student academic achievement. Participating schools designated as having new facilities were determined by the campus earning an Educational Appropriateness Award from the Texas Association of School Boards between 2005 and 2009. Older…

  2. Rehabilitation centers in change: participatory methods for managing redesign and renovation.

    PubMed

    Lahtinen, Marjaana; Nenonen, Suvi; Rasila, Heidi; Lehtelä, Jouni; Ruohomäki, Virpi; Reijula, Kari

    2014-01-01

    The aim of this article is to describe a set of participatory methods that we have either developed or modified for developing future work and service environments to better suit renewable rehabilitation processes. We discuss the methods in a larger framework of change process model and participatory design. Rehabilitation organizations are currently in transition; customer groups, financing, services, and the processes of rehabilitation centers are changing. The pressure for change challenges the centers to develop both their processes and facilities. There is a need for methods that support change management. Four participatory methods were developed: future workshop, change survey, multi-method assessment tool, and participatory design generator cards. They were tested and evaluated in three rehabilitation centers at the different phases of their change process. The developed methods were considered useful in creating a mutual understanding of the change goals between different stakeholders, providing a good picture of the work community's attitudes toward the change, forming an integrated overview of the built and perceived environment, inspiring new solutions, and supporting the management in steering the change process. The change process model described in this article serves as a practical framework that combined the viewpoints of organizational and facility development. However, participatory design continues to face challenges concerning communication between different stakeholders, and further development of the methods and processes is still needed. Intervention studies could provide data on the success factors that enhance the transformations in the rehabilitation sector. Design process, methodology, organizational transformation, planning, renovation.

  3. FME Carpentry Shop Keeps Facility in Good Repair | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer Did you know that what most people call the Carpentry Shop at Facilities Maintenance and Engineering (FME) is actually made up of the three crafts, woodcrafting, painting, and locksmithing?  On any given day, throughout the Frederick National Laboratory campus, you may find shop staff utilizing an assortment of tools and a wide range of skills on projects ranging from simple maintenance to complete renovations.

  4. The University of Michigan, Kellogg Building Expansion & Renovation, Ann Arbor, Michigan.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design, construction, and cost data for the University of Michigan's Kellogg Building expansion and renovation project. A list of project manufacturers and suppliers is provided along with four photographs and four floor plans. (GR)

  5. Indoor air quality during renovation actions: a case study.

    PubMed

    Abdel Hameed, A A; Yasser, I H; Khoder, I M

    2004-09-01

    A temporary renovation activity releases considerably high concentrations of particulate matter, viable and non-viable, into air. These pollutants are a potential contributor to unacceptable indoor air quality (IAQ). Particulate matter and its constituents lead, sulfate, nitrate, chloride, ammonium and fungi as well as fungal spores in air were evaluated in a building during renovation action. Suspended dust was recorded at a mean value of 6.1 mg m(-3) which exceeded the Egyptian limit values for indoor air (0.15 mg m(-3)) and occupational environments (5 mg m(-3)). The highest particle frequency (23%) of aerodynamic diameter (dae) was 1.7 microm. Particulate sulfate (SO(4)(2-)), nitrate (NO(3)(-)), chloride (Cl(-)), ammonium (NH(4)(+)) and lead components of suspended dust averaged 2960, 28, 1350, 100 and 13.3 microg m(-3), respectively. Viable fungi associated with suspended dust and that in air averaged 1.11 x 10(6) colony forming unit per gram (cfu g(-1)) and 92 colony forming unit per plate per hour (cfu p(-1) h(-1)), respectively. Cladosporium(33%), Aspergillus(25.6%), Alternaria(11.2%) and Penicillium(6.6%) were the most frequent fungal genera in air, whereas Aspergillus(56.8%), Penicillium(10.3%) and Eurotium(10.3%) were the most common fungal genera associated with suspended dust. The detection of Aureobasidium, Epicoccum, Exophiala, Paecilomyces, Scopulariopsis, Ulocladium and Trichoderma is an indication of moisture-damaged building materials. Alternaria, Aureobasidium, Cladosporium, Scopulariopsis and Nigrospora have dae > 5 microm whereas Aspergillus, Penicillium and Verticillium have dae < 5 microm which are suited to penetrate deeply into lungs. Particulate matter from the working area infiltrates the occupied zones if precautionary measures are inadequate. This may cause deterioration of IAQ, discomfort and acute health problems. Renovation should be carefully designed and managed, in order to minimize degradation of the indoor and outdoor air

  6. Guide to School Renovation and Construction: What You Need To Know To Protect Child and Adult Environmental Health.

    ERIC Educational Resources Information Center

    Healthy Schools Network, Inc., Albany, NY.

    This guide presents cautionary tips for protecting children's health during school renovation and construction projects, the New York state laws regarding school renovation and construction, and the steps the laws require to eliminate dangerous conditions for children during these projects. Included is a checklist of uniform safety standards…

  7. Renovating Early Childhood Education Pedagogy: A Case Study in Vietnam

    ERIC Educational Resources Information Center

    Thao, Dang Phuong; Boyd, Wendy Anne

    2014-01-01

    Since 2003, the Vietnamese government has prioritised curriculum reform efforts and commitment to improving the quality of the national curriculum. The Vietnamese early childhood education renovation has encountered considerable changes and challenges, particularly in the area of pedagogical approaches. Many early childhood teachers continue to…

  8. Patient satisfaction is biased by renovations to the interior of a primary care office: a pretest-posttest assessment.

    PubMed

    Tièche, Raphaël; da Costa, Bruno R; Streit, Sven

    2016-08-11

    Measuring quality of care is essential to improve primary care. Quality of primary care for patients is usually assessed by patient satisfaction questionnaires. However, patients may not be able to judge quality of care without also reflecting their perception of the environment. We determined the effect that redesigning a primary care office had on patient satisfaction. We hypothesized that renovating the interior would make patients more satisfied with the quality of medical care. We performed a Pretest-Posttest analysis in a recently renovated single-practice primary care office in Grenchen, Switzerland. Before and after renovation, we distributed a questionnaire to assess patient satisfaction in four domains. We chose a Likert scale (1 = very poor to 6 = very good), and 12 quality indicators, and included two consecutive samples of patients presenting at the primary care office before (n = 153) and after (n = 153) interior design renovation. Response rate was high (overall 85 %). The sample was similar to the enlisted patient collective, but the sample population was older (60 years) than the collective (52 years). Patient satisfaction was higher for all domains after the office was renovated (p < 0.01-0.001). Results did not change when we included potential confounders in the multivariable model (p < 0.01). Renovating the interior of a primary care office was associated with improved patient satisfaction, including satisfaction in domains otherwise unchanged. Physician skills and patient satisfaction sometimes depend on surrounding factors that may bias the ability of patients to assess the quality of medical care. These biases should be taken into account when quality assessment instruments are designed for patients.

  9. Report on renovation of "Shinagawa City Samezu Exercise Park " taking in the idea of Children

    NASA Astrophysics Data System (ADS)

    Ogawa, Susumu; Amma, Yoko

    When constructing and renovating parks in Shinagawa city, we collect various needs from local citizens by briefing, workshop and public comment. However, only adult people usually come to workshop. And there are few expression by children who are main users of parks. Then we made plan of a new park with children who play major roles in their future as part of town development. This plan is shown in Shinagawa city basics design which instituted in April 2008. And during construction of it we held observation tour with children to get more familiar to their parks. After finishing construction, we are going to maintain together with them by planting flowers etc. In this way, we cultivate mind that adults and children conduct town development together by system in which children can continuously take part in each step of making parks.

  10. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    NASA Astrophysics Data System (ADS)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  11. The Effect of School Building Renovation/Construction on School Culture

    ERIC Educational Resources Information Center

    Lesisko, Lee J.; Wright, Robert J.; O'Hern, Brenda

    2010-01-01

    School construction or renovation projects can have a profound affect on students, faculty and administration. The literature revealed that continuous communication is essential for a smooth process. This research identified bureaucratic issues and school climate to be leading factors of concern during construction projects. Analysis of this study…

  12. Trusses Of Tensegrity Type In A Concept Of Train Station Renovation In Żary

    NASA Astrophysics Data System (ADS)

    Lechocka, Paulina

    2015-09-01

    The first railway station in Żary was built in 1843 in Germany. After the Second World War and years of socialism in Poland the meaning of railway decreased and its technical condition deteriorated. Now the building needs renovation and change of function. Tensegrity structures may be useful in renovation of platforms shelter. They are strut and tie construction, in which there is self-stabilization between compressed and tensioned elements. Conception of new platform shelter is based on exemplary tensegrity module consist of three struts and nine cables (called "Simplex"). Tensegrity would make railway station more modern, but not cover its original elevation.

  13. Adequacy Post-"Rose v. Council for Better Education" in Kentucky Public School Facilities: A Case Study

    ERIC Educational Resources Information Center

    Wilson, Caroline Ford

    2013-01-01

    The decision in the 1989 landmark Kentucky case, "Rose v. Council for Better Education," initiated many reforms to ensure that children have access to an adequate education, including funding new construction and renovations for school facilities. The purpose of this instrumental, qualitative case study is to describe how the additional…

  14. 40 CFR 745.82 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... to have been repainted or refinished separately. (3) Renovations in target housing or child-occupied...

  15. 40 CFR 745.82 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... to have been repainted or refinished separately. (3) Renovations in target housing or child-occupied...

  16. 40 CFR 745.82 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... to have been repainted or refinished separately. (3) Renovations in target housing or child-occupied...

  17. Floor vibration evaluations for medical facilities

    NASA Astrophysics Data System (ADS)

    Himmel, Chad N.

    2003-10-01

    The structural floor design for new medical facilities is often selected early in the design phase and in renovation projects, the floor structure already exists. Because the floor structure can often have an influence on the location of vibration sensitive medical equipment and facilities, it is becoming necessary to identify the best locations for equipment and facilities early in the design process. Even though specific criteria for vibration-sensitive uses and equipment may not always be available early in the design phase, it should be possible to determine compatible floor structures for planned vibration-sensitive uses by comparing conceptual layouts with generic floor vibration criteria. Relatively simple evaluations of planned uses and generic criteria, combined with on-site vibration and noise measurements early in design phase, can significantly reduce future design problems and expense. Concepts of evaluation procedures and analyses will be presented in this paper. Generic floor vibration criteria and appropriate parameters to control resonant floor vibration and noise will be discussed for typical medical facilities and medical research facilities. Physical, economic, and logistical limitations that affect implementation will be discussed through case studies.

  18. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN... certified renovator. (3) Individuals who have successfully completed an accredited lead-based paint... are currently certified as lead-based paint inspectors or risk assessors may act as certified dust...

  19. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN... certified renovator. (3) Individuals who have successfully completed an accredited lead-based paint... are currently certified as lead-based paint inspectors or risk assessors may act as certified dust...

  20. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN... certified renovator. (3) Individuals who have successfully completed an accredited lead-based paint... are currently certified as lead-based paint inspectors or risk assessors may act as certified dust...

  1. Financing Facilities in Rural School Districts: Variations among the States and the Case of Arkansas.

    ERIC Educational Resources Information Center

    Hughes, Mary F.

    This chapter examines the main challenges that rural school districts face in school facilities funding and illustrates these problems with a case study of Arkansas. Most rural school districts serve only a small number of students, which tends to limit the funds available for construction or renovation. In addition, rural districts are likely to…

  2. Association of outdoor air pollution and indoor renovation with early childhood ear infection in China.

    PubMed

    Deng, Qihong; Lu, Chan; Jiang, Wei; Zhao, Jinping; Deng, Linjing; Xiang, Yuguang

    2017-02-01

    Otitis media (OM) is a common infection in early childhood with repeated attacks that lead to long-term complications and sequelae, but its risk factors still remain unclear. To examine the risk of childhood OM for different indoor and outdoor air pollutants during different timing windows, with a purpose to identify critical windows of exposure and key components of air pollution in the development of OM. We conducted a retrospective cohort study of 1617 children aged 3-4 years in Changsha, China (2011-2012). Children's life-time prevalence of OM and exposure to indoor air pollution related to home renovation activities were surveyed by a questionnaire administered by the parents. Children's exposure to outdoor air pollution, including nitrogen dioxide (NO 2 ), sulfur dioxide (SO 2 ), and particulate matter with an aerodynamic diameter ≤ 10 μm (PM 10 ), was estimated using the measured concentrations at municipal monitoring stations. The odds ratio (OR) and 95% confidence interval (CI) of childhood OM for prenatal and postnatal exposure to indoor and outdoor air pollution were examined by using logistic regression model. Life-time prevalence of OM in preschool children (7.3%) was associated not only with prenatal exposure to industrial air pollutant with adjusted OR (95% CI) = 1.44 (1.09-1.88) for a 27 μg/m 3 increase in SO 2 but also with postnatal exposure to indoor renovations with OR (95% CI) = 1.62 (1.05-2.49) for new furniture and 1.81 (1.12-2.91) for redecoration, particularly in girls. Combined exposure to outdoor SO 2 and indoor renovation significantly increased OM risk. Furthermore, we found that exposure to outdoor SO 2 and indoor renovation were significantly associated with the onset but not repeated attacks of OM. Prenatal exposure to outdoor industrial air pollution and postnatal exposure to indoor renovation are independently associated with early childhood OM in China and may cause the OM onset. Copyright © 2016 Elsevier Ltd. All

  3. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  4. AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned

    DTIC Science & Technology

    2010-05-19

    AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned Daniel F. Schwartz Air Force Research Laboratory ...9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) Air Force Research Laboratory (AFMC) AFRL /RZS...provide the United States Air Force with advanced rocket propulsion technologies, the Air Force Research

  5. Renovating Interior Office Space: What a Manager Needs To Consider.

    ERIC Educational Resources Information Center

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  6. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    NASA Astrophysics Data System (ADS)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  7. Decision Support Model for Mosque Renovation and Rehabilitation (Case Study: Ten Mosques in Jakarta Barat, Indonesia)

    NASA Astrophysics Data System (ADS)

    Utama, D. N.; Triana, Y. S.; Iqbal, M. M.; Iksal, M.; Fikri, I.; Dharmawan, T.

    2018-03-01

    Mosque, for Muslim, is not only a place for daily worshipping, however as a center of culture as well. It is an important and valuable building to be well managed. For a responsible department or institution (such as Religion or Plan Department in Indonesia), to practically manage a lot of mosques is not simple task to handle. The challenge is in relation to data number and characteristic problems tackled. Specifically for renovating and rehabilitating the damaged mosques, a decision to determine the first damaged mosque priority to be renovated and rehabilitated is problematic. Through two types of optimization method, simulated-annealing and hill-climbing, a decision support model for mosque renovation and rehabilitation was systematically constructed. The method fuzzy-logic was also operated to establish the priority of eleven selected parameters. The constructed model is able to simulate an efficiency comparison between two optimization methods used and suggest the most objective decision coming from 196 generated alternatives.

  8. The Interaction Between Prenatal Exposure to Home Renovation and Reactive Oxygen Species Genes in Cord Blood IgE Response is Modified by Maternal Atopy

    PubMed Central

    Yu, Jinho; Shin, Youn Ho; Kim, Kyung Won; Suh, Dong In; Yu, Ho-Sung; Kang, Mi-Jin; Lee, Kyung-Shin; Hong, Seo Ah; Choi, Kil Yong; Lee, Eun; Yang, Song-I; Seo, Ju-Hee; Kim, Byoung-Ju; Kim, Hyo-Bin; Lee, So-Yeon; Choi, Suk-Joo; Oh, Soo-Young; Kwon, Ja-Young; Lee, Kyung-Ju; Park, Hee Jin; Lee, Pil Ryang; Won, Hye-Sung

    2016-01-01

    Purpose Although home renovation exposure during childhood has been identified as a risk factor for the development of allergy, there is limited information on the association between prenatal exposure to home renovation and cord blood (CB) IgE response. The aims of this study were to identify the effect of prenatal exposure to home renovation on CB IgE levels, and to investigate whether this exposure interacts with neonatal genes and whether the effect can be modified by maternal atopy. Methods This study included 1,002 mother-neonate pairs from the COhort for Childhood Origin of Asthma and allergic diseases (COCOA). Prenatal environmental factors were collected using a questionnaire. The levels of CB IgE were measured by the ImmunoCAP system, and DNA was extracted from CB. Results Exposure to home renovation during the prenatal period was associated with significantly higher levels of CB IgE only in neonates from atopic mothers, and the effect of renovation exposure on CB IgE levels persisted from 31 months before birth. Furthermore, prenatal exposure to home renovation increased the risk of CB IgE response interacting with polymorphisms of NRF2 and GSTP1 genes only in neonates from atopic mothers. Conclusions Maternal atopy modified the effect of prenatal exposure to home renovation on CB serum IgE response as well as the interaction between the exposure and neonatal genes involved in the oxidative stress pathway. These findings suggest that the genetically susceptible offspring of atopic mothers may be more vulnerable to the effect of prenatal exposure to home renovation on the development of allergy. PMID:26540500

  9. 33 CFR Appendix A to Part 105 - Facility Vulnerability and Security Measures Summary (Form CG-6025)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Facility Vulnerability and Security Measures Summary (Form CG-6025) A Appendix A to Part 105 Navigation and Navigable Waters COAST... Appendix A to Part 105—Facility Vulnerability and Security Measures Summary (Form CG-6025) ER22OC03.000...

  10. A Bookless Library, Part II: Managing Access Services with No In-House Collections

    ERIC Educational Resources Information Center

    Sewell, Bethany B.

    2013-01-01

    In the spring of 2011, the Penrose Library at the University of Denver began the process of storing all materials, services, and staff to temporary locations in preparation for a building renovation project. The library was faced with the challenge of delivering all materials from an off-site storage facility within two hours of request. A new…

  11. How To Get What You Want When Working on a Renovation Project.

    ERIC Educational Resources Information Center

    Roark, Steven

    2002-01-01

    Describes how leaders and instructors in the Art Department of Longview Community College in Kansas City, Missouri, found a solution to incorporating a desired renovation feature (a sink in the ceramics and clay studio) within budget constraints. (EV)

  12. College and University Facilities Survey. Part 4: College and University Enrollment and Facilities Survey 1961-65.

    ERIC Educational Resources Information Center

    Robbins, Leslie F.; Bokelman, W. Robert

    As Part 4 of a series of five studies, data is provided by colleges and universities on what capital facilities were planned, per square foot costs, and how they were financed during 1960-61, plus how they proposed to do so up to 1965-66. Comprehensive data is presented on existing, potential, and projected enrollments, plans for constructing…

  13. Common Day Care Safety Renovations: Descriptions, Explanations and Cost Estimates.

    ERIC Educational Resources Information Center

    Spack, Stan

    This booklet explains some of the day care safety features specified by the new Massachusetts State Building Code (January 1, 1975) which must be met before a new day care center can be licensed. The safety features described are those which most often require renovation to meet the building code standards. Best estimates of the costs involved in…

  14. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Tests To Be Performed at the Bus Testing Facility... Part 665—Tests To Be Performed at the Bus Testing Facility The eight tests to be performed on each vehicle are required by SAFETEA-LU and are based in part on tests described in the FTA report “First...

  15. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Tests To Be Performed at the Bus Testing Facility... Part 665—Tests To Be Performed at the Bus Testing Facility The eight tests to be performed on each vehicle are required by SAFETEA-LU and are based in part on tests described in the FTA report “First...

  16. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  17. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  18. How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money. Energy-Smart Building Choices.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    This guide addresses contributions that school facility administrators and business officials can make in an effort to reduce operating costs and free up money for capital improvements. The guide explores opportunities available to utilize energy-saving strategies at any stage in a building's life, from its initial design phase through renovation.…

  19. Review Of Existing Facilities: Shock Tunnels, Part of AIAA Short Course On Aerothermodynamic Facilities and Applications

    NASA Technical Reports Server (NTRS)

    Bogdanoff, David W.; Edwards, Thomas A. (Technical Monitor)

    1995-01-01

    This review is divided into two main sections. The first section described the various types of shock tunnel facilities - reflected shock tunnels, non-reflected shock tunnels and expansion tubes/tunnels. Driver technology is then described, followed by a discussion of the performance obtainable from various driver-driven combinations. A survey of a number of facilities is then presented. The second part of the review deals with details of the operation of the facilities. Operation of combustion drivers, electrically heated drivers and piston compression drivers is discussed in some detail. Main diaphragm break techniques are discussed, with particular attention being paid to maintaining the integrity of the diaphragm petals. Secondary diaphragm techniques are discussed. Phenomena which limit test time are discussed and a number of techniques to increase test time are presented. Contamination of the flow with material ablated from the wall is discussed along with the relative suitability of various materials for lining the tubes and nozzle. Finally, boundary layer effects in shock tunnels and expansion tubes are discussed.

  20. 40 CFR 745.82 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... with significant damage. Interim controls performed in response to an elevated blood lead level in a...

  1. Determination of VOCs in the Indoor Air of a New and a Renovated Apartment

    NASA Astrophysics Data System (ADS)

    Meciarova, Ludmila; Vilcekova, Silvia

    2016-06-01

    This study deals with the occurrence of volatile organic compounds (VOCs) in the indoor environment of a new and a renovated apartment. Qualitative determination of VOCs was carried out with a gas chromatograph with surface acoustic wave detector (GC/SAW). Concentrations of total volatile organic compounds (TVOC) were determined by a photoionization detector with UV lamp. Simultaneously, temperature and relative humidity were monitored with a data logger. The aim of this study was to determine of TVOC concentrations, to use of GC/SAW for determination of individual VOCs in indoor air as well as to predict possible sources of VOCs in these apartments. Measurements were performed after each construction work for better resolution of the contributions of individual materials to the levels of VOC. Mean concentrations of TVOC were 624 μg/m3 in the renovated apartment and 1,686 μg/m3 in the new apartment after completion of all works. The results from the renovated apartment showed that the use of new materials can lead to lower levels of organic compounds in indoor air compared to old materials that were less environmentally friendly. Many types of VOCs were found in both apartments. After reviewing the possible sources, it seems that the main sources of these substances were applied coatings and flooring materials.

  2. A Godsend for Colleges: Kresge Foundation Gives Money for Construction and Renovation.

    ERIC Educational Resources Information Center

    McMillen, Liz

    1990-01-01

    The Kresge Foundation is one of the few national foundations that give money only for construction and renovation at nonprofit organizations, a boon for colleges and universities with severe deferred maintenance problems. Recently, the foundation added a program to upgrade science equipment. Participating colleges must also raise funds. (MSE)

  3. Reconstruction of 3d Objects of Assets and Facilities by Using Benchmark Points

    NASA Astrophysics Data System (ADS)

    Baig, S. U.; Rahman, A. A.

    2013-08-01

    Acquiring and modeling 3D geo-data of building assets and facility objects is one of the challenges. A number of methods and technologies are being utilized for this purpose. Total station, GPS, photogrammetric and terrestrial laser scanning are few of these technologies. In this paper, points commonly shared by potential facades of assets and facilities modeled from point clouds are identified. These points are useful for modeling process to reconstruct 3D models of assets and facilities stored to be used for management purposes. These models are segmented through different planes to produce accurate 2D plans. This novel method improves the efficiency and quality of construction of models of assets and facilities with the aim utilize in 3D management projects such as maintenance of buildings or group of items that need to be replaced, or renovated for new services.

  4. Self-reported health outcomes associated with green-renovated public housing among primarily elderly residents.

    PubMed

    Breysse, Jill; Dixon, Sherry L; Jacobs, David E; Lopez, Jorge; Weber, William

    2015-01-01

    Assess the benefits of green renovation on self-reported health of primarily elderly residents of a low-income public housing apartment building. Using questions from the Medicare Health Outcomes Survey, we interviewed residents at baseline and 1 year after green renovation of their 101-unit building in Mankato, Minnesota, comparing self-reported mental and physical health outcomes of 2 sets of residents (all-ages: median, 66 years, n = 40; elder: median, 72 years, n = 22) with outcomes for 2 same-aged low-income Minnesota comparison groups taken from Medicare Health Outcomes Survey participants (n = 40 and 572, respectively). Mankato apartment building residents. Green renovation including building envelope restoration; new heating, electrical, and ventilation systems; air sealing; new insulation and exterior cladding; window replacement; Energy-Star fixtures and appliances; asbestos and mold abatement; apartment gut retrofits; low volatile organic chemical and moisture-resistant materials; exercise enhancements; and indoor no-smoking policy. Self-reported health status including Activities of Daily Living and Veteran's Rand 12 (VR-12) survey results; housing condition visual assessment; indoor environmental sampling; and building performance testing. The all-ages study group's mental health improved significantly more than the comparison group's mental health on the basis of mean number of good mental health days in the past month (P = .026) and mean VR-12 mental component score (P = .023). Sixteen percent fewer all-ages study group people versus 8% more comparison group people reported falls (P = .055). The elder study group's 9% improvement in general physical health was not statistically significantly better than the elder comparison group's decline (6%) (P = 0.094). Significantly fewer people in the all-ages group reported smoke in their apartments because of tobacco products (20% vs 0%, P = .005), likely reflecting the new no-smoking policy. Green healthy

  5. Composition of heavy metals and airborne fibers in the indoor environment of a building during renovation.

    PubMed

    Latif, Mohd Talib; Baharudin, Nor Hafizah; Velayutham, Puvaneswary; Awang, Normah; Hamdan, Harimah; Mohamad, Ruqyyah; Mokhtar, Mazlin B

    2011-10-01

    The renovation of a building will certainly affect the quality of air in the vicinity of where associated activities were undertaken, this includes the quality of air inside the building. Indoor air pollutants such as particulate matter, heavy metals, and fine fibers are likely to be emitted during renovation work. This study was conducted to determine the concentration of heavy metals, asbestos and suspended particulates in the Biology Building, at the Universiti Kebangsaan, Malaysia (UKM). Renovation activities were carried out widely in the laboratories which were located in this building. A low-volume sampler was used to collect suspended particulate matter of a diameter size less than 10 μm (PM₁₀) and an air sampling pump, fitted with a cellulose ester membrane filter, were used for asbestos sampling. Dust was collected using a small brush and scope. The concentration of heavy metals was determined through the use of inductively coupled plasma-mass spectroscopy and the fibers were counted through a phase contrast microscope. The concentrations of PM₁₀ recorded in the building during renovation action (ranging from 166 to 542 μg m⁻³) were higher than the value set by the Department of Safety and Health for respirable dust (150 μg m⁻³). Additionally, they were higher than the value of PM₁₀ recorded in indoor environments from other studies. The composition of heavy metals in PM₁₀ and indoor dust were found to be dominated by Zn and results also showed that the concentration of heavy metals in indoor dust and PM₁₀ in this study was higher than levels recorded in other similar studies. The asbestos concentration was 0.0038 ± 0.0011 fibers/cc. This was lower than the value set by the Malaysian Department of Occupational, Safety and Health (DOSH) regulations of 0.1 fibers/cc, but higher than the background value usually recorded in indoor environments. This study strongly suggests that renovation issues need to be considered seriously

  6. School Renovation and the Importance of Maintenance. [Interview with Charles Boney, Jr.].

    ERIC Educational Resources Information Center

    Butterfield, Eric

    Charles Boney, Jr., Director of Boney Architects, offers his views on school districts that build schools that have to be replaced too soon, general problems concerning renovation of older buildings, and keeping maintenance costs down. He discusses the types of flooring materials school districts should consider using to lower maintenance costs…

  7. Financing New Technologies, Equipment/Furniture Replacement, and Building Renovation: A Survey Report.

    ERIC Educational Resources Information Center

    Shirk, Gary M.

    1984-01-01

    Reports results of survey of methods used by 77 North American academic and public libraries to finance implementation of new technologies, replace equipment and furniture, and renovate buildings. Financing methods used, frequency of use, choice, and range of methods are discussed. Eight references and list of survey participants are appended.…

  8. Pitfalls Lurk for School-Project Chiefs

    ERIC Educational Resources Information Center

    Sack, Joetta L.

    2004-01-01

    This paper, Part 3 of a three-part series examining the boom in the construction and renovation of K-12 schools and the continuing challenges that communities face in getting the facilities their students and educators need, describes the demanding career aspects of school administrators who oversee construction projects. Building schools requires…

  9. Building a New Library or Renovating an Old: Some Things To Consider.

    ERIC Educational Resources Information Center

    McCabe, Gerard B.

    This article provides suggestions for librarians who are planning for the construction of new library buildings or the renovation or conversion of older buildings. The recommendations are based on practical experience gained by a Director of University Libraries in the planning and construction of Tompkins-McCaw and James Branch Cabell Libraries…

  10. Wastewater renovation using constructed soil filter (CSF): a novel approach.

    PubMed

    Nemade, P D; Kadam, A M; Shankar, H S

    2009-10-30

    Constructed soil filter (CSF) also known as Soil Biotechnology (SBT) is a process for water renovation which makes use of formulated media with culture of soil macro- and microorganisms. CSF combines sedimentation, infiltration and biodegradation processes to remove oxidizable organics and inorganics of wastewater in a single facility. Operating experience shows hydraulic loading in the range of 0.05-0.25 m(3)/m(2) h and organic loading up to 200-680 g/m(2) d. The results show increase in dissolved oxygen levels, COD removal (from 352 mg/l to 20 mg/l); BOD removal (from 211 mg/l to 7.0 mg/l); suspended solids removal (from 293 mg/l to 16 mg/l); turbidity reduction (from 145 NTU to 5.3 NTU); iron (from 5 mg/l to 0.3 mg/l); arsenic (from 500 microg/l to 10 microg/l); total coliform and fecal coliform removal (from 145 x 10(5) to 55 CFU/100 mL and 150 x 10(8) to 110 CFU/100 mL respectively), with desired pathogen levels as per WHO standards, i.e. < or =10(3) CFU/100 mL. CSF reveals advantages such as low HRT (0.5-2.0 h), low energy requirement (0.04 kWh/m(3)), no pre-treatment, high dissolved oxygen levels in the effluent, no biosludge production, no mechanical aeration and no odor, fish compatible water quality and evergreen ambience.

  11. 16 CFR Figures 3 and 4 to Part 1204 - High Voltage Test Facility and Antenna System Test Setup

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false High Voltage Test Facility and Antenna System Test Setup 3 Figures 3 and 4 to Part 1204 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION... ANTENNAS Pt. 1204, Figs. 3, 4 Figures 3 and 4 to Part 1204—High Voltage Test Facility and Antenna System...

  12. 16 CFR Figures 3 and 4 to Part 1204 - High Voltage Test Facility and Antenna System Test Setup

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false High Voltage Test Facility and Antenna System Test Setup 3 Figures 3 and 4 to Part 1204 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION... ANTENNAS Pt. 1204, Figs. 3, 4 Figures 3 and 4 to Part 1204—High Voltage Test Facility and Antenna System...

  13. 16 CFR Figures 3 and 4 to Part 1204 - High Voltage Test Facility and Antenna System Test Setup

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false High Voltage Test Facility and Antenna System Test Setup 3 Figures 3 and 4 to Part 1204 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION... ANTENNAS Pt. 1204, Figs. 3, 4 Figures 3 and 4 to Part 1204—High Voltage Test Facility and Antenna System...

  14. 16 CFR Figures 3 and 4 to Part 1204 - High Voltage Test Facility and Antenna System Test Setup

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false High Voltage Test Facility and Antenna System Test Setup 3 Figures 3 and 4 to Part 1204 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION... ANTENNAS Pt. 1204, Figs. 3, 4 Figures 3 and 4 to Part 1204—High Voltage Test Facility and Antenna System...

  15. Evaluation of Water Quality Renovation by Advanced Soil-Based Wastewater Treatment Systems

    NASA Astrophysics Data System (ADS)

    Cooper, J.; Loomis, G.; Kalen, D.; Boving, T.; Morales, I.; DeLuca, J.; Amador, J.

    2013-12-01

    25% of US households utilize onsite wastewater treatment systems (OWTS) for wastewater management. Advanced technologies were designed to overcome the inadequate wastewater treatment by conventional OWTS in critical shallow water table areas, such as coastal zones, in order to protect ground water quality. In addition to the septic tank and soil drainfield that comprise a conventional OWTS, advanced systems claim improved water renovation with the addition of sand filtration, timed dosing controls, and shallow placement of the infiltrative zone. We determined water quality renovation functions under current water table and temperature conditions, in anticipation of an experiment to measure OWTS response to a climate change scenario of 30-cm increase in water table elevation and 4C temperature increase. Replicate (n=3) intact soil mesocosms were used to evaluate the effectiveness of drainfields with a conventional wastewater delivery (pipe-and-stone) compared to two types of pressurized, shallow narrow drainfield. Results under steady state conditions indicate complete removal of fecal coliform bacteria, phosphorus and BOD by all soil-based systems. By contrast, removal of total nitrogen inputs was 16% in conventional and 11% for both advanced drainfields. Effluent waters maintained a steady state pH between 3.2 - 3.7 for all technologies. Average DO readings were 2.9mg/L for conventional drainfield effluent and 4.6mg/L for advanced, showing the expected oxygen uptake with shallow placement of the infiltrative zone. The conventional OWTS is outperforming the advanced with respect to nitrogen removal, but renovating wastewater equivalently for all other contaminants of concern. The results of this study are expected to facilitate development of future OWTS regulation and planning guidelines, particularly in coastal zones and in the face of a changing climate.

  16. Renovating Alzheimer's: "Constructive" Reflections on the New Clinical and Research Diagnostic Guidelines

    ERIC Educational Resources Information Center

    George, Daniel R.; Qualls, Sara H.; Camp, Cameron J.; Whitehouse, Peter J.

    2013-01-01

    The development of disease concepts for conditions such as Alzheimer's disease (AD) is an ongoing social process that evolves over time. The biomedical paradigm about AD that has informed our culture's understanding of brain aging for the past several decades is currently undergoing a major and timely renovation in the early 21st century. This…

  17. Successfully Demonstrating an Integrated Roofing and BIPV Solution for an Historic Building Renovation at the United States Air Force Academy

    DTIC Science & Technology

    2011-05-01

    Solution for an Historic Building Renovation at the United States Air Force Academy • Abstract Number: 12623 Vandenberg Hall • Thin Film Solar Array • Direct...Phase 1 • Total installed production capacity: 212.320 KW DC • Panels type and quantity: • Unisolar Thin Film Amorphous Silicon Panels • 1210 – Power...Successfully Demonstrating an Integrated Roofing and BIPV Solution for an Historic Building Renovation at the United States Air Force Academy

  18. 77 FR 13610 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... Information Collection Activity; Comment Request Proposed Project Title: Head Start Facilities Construction, Purchase and Major Renovations. OMB No.: 0970-0193. Description: The Head Start Bureau is proposing to.... The part contains the administrative requirements applicable to Head Start and Early Head Start...

  19. Tenement House "Under The Golden Crown" In Wrocław - Renovation Of The Peculiar Monument

    NASA Astrophysics Data System (ADS)

    Kirschke, Krystyna

    2015-12-01

    Among the many historic buildings in Wroclaw, there is a property address Rynek 29 - Oławska 2, that in 1970 entered in the register of monuments as "a department store, earlier tenement house called "Under the Golden Crown". In the fact it was built in 1961 and it is neither a historical building nor department store. It is, spectacular example of creative retrospective, in the post-war reconstruction of Wroclaw. It has relict of medieval and Renaissance architecture, but the aboveground parts have a skeleton structure of commercial buildings from the early 20th century. In recent years, there is a problem with renovating such buildings. Recognition of these monuments has become a requirement now. Because only in this way in the future, in the course of modernization works, you will be able to avoid bad decisions and unforeseen situations.

  20. Notification: EPA's Implementation and Enforcement of the Lead-Based Paint Renovation, Repair and Painting Rule

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0162, March 28, 2018. The OIG plans to begin preliminary research to evaluate the EPA's implementation and enforcement of the Lead-Based Paint Renovation, Repair and Painting Rule (RRP).

  1. 16 CFR Figures 1 and 2 to Part 1204 - Suggested Instrumentation for Current Monitoring Device and High Voltage Facility

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Monitoring Device and High Voltage Facility 1 Figures 1 and 2 to Part 1204 Commercial Practices CONSUMER... CITIZENS BAND BASE STATION ANTENNAS Pt. 1204, Figs. 1, 2 Figures 1 and 2 to Part 1204—Suggested Instrumentation for Current Monitoring Device and High Voltage Facility EC03OC91.008 ...

  2. 16 CFR Figures 1 and 2 to Part 1204 - Suggested Instrumentation for Current Monitoring Device and High Voltage Facility

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Monitoring Device and High Voltage Facility 1 Figures 1 and 2 to Part 1204 Commercial Practices CONSUMER... CITIZENS BAND BASE STATION ANTENNAS Pt. 1204, Figs. 1, 2 Figures 1 and 2 to Part 1204—Suggested Instrumentation for Current Monitoring Device and High Voltage Facility EC03OC91.008 ...

  3. Indoor Lighting Facilities

    NASA Astrophysics Data System (ADS)

    Matsushima, Koji; Saito, Yoshinori; Ichikawa, Shigenori; Kawauchi, Takao; Tanaka, Tsuneo; Hirano, Rika; Tazuke, Fuyuki

    According to the statistics on building construction floor area from the Ministry of Land, Infrastructure, Transport and Tourism, the total floor area of building construction started in Japan in 2007 was 160,991 thousand square meters, or 14.8% less than the area of the previous year, and the reduction was the first reduction in the past five years. The office markets in Tokyo and Nagoya were active, as represented by the supplies of skyscrapers, and energy saving measures, such as the adoption of high efficiency lighting equipment, the control for initial stage illuminance, daylight harvesting, and the use of occupancy sensors, were well established. In the field of public construction, including museums, multi-purpose halls, and religious buildings, the total area of the new construction was 10.8% less than the total for the previous year, and this reduction was a continuation of an eleven-year trend. In spaces with high ceiling, the innovation for easy replacement of light sources used with reflection mirror systems and optical fibers was noted. Hospitals adapted to the expectation for improved services in their selection of lighting facilities to improve the residential environment for patients while taking into consideration the needs of the aging population, by their use of devices in corridors to help maintain a continuity of light. In libraries, a pendant system was developed to illuminate both ceilings and book shelves. In the field of theaters and halls, the time limit for repairing existing systems had come for the large facilities that were opened during the theater and hall construction boom of the 1960s through 1980s, and around 26 renovations were done. Almost all the renovations were conversions to intelligent dimming systems and lighting control desks. In the field of stores and commercial facilities, the atmosphere and glitter of the selling floor was produced by new light sources, such as ceramic metal halide lamps and LEDs, which have high

  4. Treatment of CHP in LEED® for Building Design and Construction: New Construction and Major Renovations

    EPA Pesticide Factsheets

    This factsheet introduces CHP and its benefits to architects and engineers, and summarizes how CHP is treated under the LEED® for Building Design and Construction: New Construction and Major Renovations (LEED BD+C: New Construction) rating system.

  5. What's New in Locker Rooms?

    ERIC Educational Resources Information Center

    Rittner-Heir, Robbin M.

    2001-01-01

    Discusses athletic facility design and renovation issues that exist because of increasing numbers of female athletes. Outlines renovation issues such as locker room facilities, space for sports equipment, and additional athletic fields. (GR)

  6. Prototype Wash Water Renovation System Integration with Government-Furnished Wash Fixture

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A total renovation concept for removing objectionable materials from spacecraft wash water to make the water reusable was developed. This concept included ferric chloride pretreatment to coagulate suspended solids such as soap and lint, pressure filtration, and carbon adsorption and ion exchange to remove trace dissolved organics and inorganic salts. A breadboard model which was developed to demonstrate the design adequacy of the various system components and the limits on system capacities and efficiencies.

  7. Construction Know-How: Making the Best Possible Decisions Regarding School Construction and Renovation Projects.

    ERIC Educational Resources Information Center

    Argon, Joe, Ed.; Spoor, Dana L.; Cox, Susan M.; Brown, Andrew; Ray, Jennifer

    1998-01-01

    Presents a series of articles that examine decision making in school construction and renovation projects. Topics include preparing for a construction project, purchasing windows that provide protection at a reasonable cost, choosing the best flooring and carpeting, and dealing with deregulation. An industry roundtable discussion on project…

  8. 75 FR 78229 - Record of Decision for the U.S. Marine Corps East Coast Basing of the F-35B Aircraft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... States Code (U.S.C.) Section 4332(2)(c), the regulations of the Council on Environmental Quality (CEQ) for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] parts 1500... action, the Marine Corps will: (1) Construct and/or renovate airfield facilities and infrastructure...

  9. A Renovation Decision-Support Model for Evaluating the Functional Condition of Army Facilities

    DTIC Science & Technology

    1994-04-01

    PAGES Buildings--Remodeling for others use cost effectiveness 90 Army facilities RENMOD 16 . PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...7540-01-280-5500 StndWd Form 296 (Rev. 2-80) Preaus by ANSI 80 23.- 16 2010 FOREWORD This research was conducted for the Assistant Chief of Staff for...it means any home improvement. To an economist, it is any investment designed to forestall the capital depreciation of a structure. To an architect

  10. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  11. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  12. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  13. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  14. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  15. 78 FR 27906 - Lead; Renovation, Repair, and Painting Program for Public and Commercial Buildings; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... construction (NAICS code 236), e.g., commercial building construction, industrial building construction, commercial and institutional building construction, building finishing contractors, drywall and insulation... Lead; Renovation, Repair, and Painting Program for Public and Commercial Buildings; Notice of Public...

  16. nZEB Renovation of Multi-Storey Building with Prefabricated Modular Panels

    NASA Astrophysics Data System (ADS)

    Pihelo, P.; Kalamees, T.; Kuusk, K.

    2017-10-01

    Reduction of energy use in buildings in EU is expected to be reached with help of fulfilling of requirements of low and nearly-zero energy buildings (nZEB) policy. The efficient way to accomplish the purpose of the nZEB is to apply the integrated design process, considering the long-term sustainability and building costs as a one setup. The multi-storey large concrete element building is renovated to nZEB as a Horizon2020 MORE-CONNECT project pilot in Tallinn. The study of that project includes complex of measures: hygrothermal measurements and analysis, highly insulated facade and roof elements, the full modernisation of heating and ventilation systems. Ventilation ducts are installed into the modular panels to minimize supply ductworks in apartments. Roof panels include solar panels and collectors for renewable energy production. All technical systems will be equipped with monitoring systems and data will be logged periodically. The designed thermal transmittance is U≤0.11W/m2K for walls, U≤0.10W/m2K for roof and U≤0.80W/m2K for windows and external doors. The analyse, design and renovation process of the integrated nZEB design method gave us a unique experience, showing weak links in the chain and helping to prevent faults in the whole process in the future.

  17. 75 FR 78229 - Record of Decision for the U.S. Marine Corps West Coast Basing of the F-35B Aircraft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... States Code (U.S.C.) Section 4332(2)(c), the regulations of the Council on Environmental Quality (CEQ) for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] parts 1500...) Construct and/or renovate airfield facilities and infrastructure necessary to accommodate and maintain the F...

  18. 10 CFR 50.83 - Release of part of a power reactor facility or site for unrestricted use.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Release of part of a power reactor facility or site for... of a power reactor facility or site for unrestricted use. (a) Prior written NRC approval is required... release. Nuclear power reactor licensees seeking NRC approval shall— (1) Evaluate the effect of releasing...

  19. 10 CFR 50.83 - Release of part of a power reactor facility or site for unrestricted use.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Release of part of a power reactor facility or site for... of a power reactor facility or site for unrestricted use. (a) Prior written NRC approval is required... release. Nuclear power reactor licensees seeking NRC approval shall— (1) Evaluate the effect of releasing...

  20. Renovating Charity Hospital or building a new hospital in post-Katrina New Orleans: economic rationale versus political will.

    PubMed

    Leleu, Hervé; Moises, James; Valdmanis, Vivian Grace

    2013-02-01

    Since September 2005, Charity Hospital of New Orleans has been closed due to Hurricane Katrina. A debate following the closing arose about whether this public hospital should be renovated or a new medical center affiliated with the Louisiana State University should be built. Using academic literature, government statistics, and popular press reports, we describe the economic implications that support the view that Charity Hospital should have been renovated. We also address why this policy was not pursued by demonstrating the influence politics and individual stakeholders (specifically, Louisiana State University) had on the eventual policy pursued. In this commentary we also note the political identity movement away from public-sector provision of services to private-sector interests.

  1. Addressing Lead-Based Paint Hazards During Renovation, Remodeling, and Rehabilitation in Federally Owned and Assisted Housing. Student Manual for Use in HUD-Sponsored Lead-Safe Work Practices Training.

    ERIC Educational Resources Information Center

    Department of Housing and Urban Development, Washington, DC.

    This student manual comprises the United States Environmental Protection Agency's model renovation training course designed for renovation, remodeling, and painting contractors. It provides information regarding the containment, minimization, and cleanup of lead hazards during activities that disturb lead painted surfaces. Introductory material…

  2. Studies of Transgenic Mosquitoes in Disease-Endemic Countries: Preparation of Containment Facilities

    PubMed Central

    Mutunga, James Mutuku; Diabaté, Abdoulaye; Namountougou, Moussa; Coulibaly, Mamadou B.; Sylla, Lakamy; Kayondo, Jonathan; Balyesima, Victor; Clark, Lorna; Benedict, Mark Q.; Raymond, Peter

    2018-01-01

    Abstract Novel approaches to area-wide control of vector species offer promise as additional tools in the fight against vectored diseases. Evaluation of transgenic insect strains aimed at field population control in disease-endemic countries may involve international partnerships and should be done in a stepwise approach, starting with studies in containment facilities. The preparations of both new-build and renovated facilities are described, including working with local and national regulations regarding land use, construction, and biosafety requirements, as well as international guidance to fill any gaps in regulation. The examples given are for containment categorization at Arthropod Containment Level 2 for initial facility design, classification of wastes, and precautions during shipping. Specific lessons were derived from preparations to evaluate transgenic (non-gene drive) mosquitoes in West and East African countries. Documented procedures and the use of a non-transgenic training strain for trial shipments and culturing were used to develop competence and confidence among the African facility staff, and along the chain of custody for transport. This practical description is offered to support other research consortia or institutions preparing containment facilities and operating procedures in conditions where research on transgenic insects is at an early stage. PMID:29337662

  3. Studies of Transgenic Mosquitoes in Disease-Endemic Countries: Preparation of Containment Facilities.

    PubMed

    Quinlan, M Megan; Mutunga, James Mutuku; Diabaté, Abdoulaye; Namountougou, Moussa; Coulibaly, Mamadou B; Sylla, Lakamy; Kayondo, Jonathan; Balyesima, Victor; Clark, Lorna; Benedict, Mark Q; Raymond, Peter

    2018-01-01

    Novel approaches to area-wide control of vector species offer promise as additional tools in the fight against vectored diseases. Evaluation of transgenic insect strains aimed at field population control in disease-endemic countries may involve international partnerships and should be done in a stepwise approach, starting with studies in containment facilities. The preparations of both new-build and renovated facilities are described, including working with local and national regulations regarding land use, construction, and biosafety requirements, as well as international guidance to fill any gaps in regulation. The examples given are for containment categorization at Arthropod Containment Level 2 for initial facility design, classification of wastes, and precautions during shipping. Specific lessons were derived from preparations to evaluate transgenic (non-gene drive) mosquitoes in West and East African countries. Documented procedures and the use of a non-transgenic training strain for trial shipments and culturing were used to develop competence and confidence among the African facility staff, and along the chain of custody for transport. This practical description is offered to support other research consortia or institutions preparing containment facilities and operating procedures in conditions where research on transgenic insects is at an early stage.

  4. 75 FR 25037 - Lead; Clearance and Clearance Testing Requirements for the Renovation, Repair, and Painting Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    .... Other technical and trade schools (NAICS code 611519), e.g., training providers. Engineering services... Renovation, Repair, and Painting Program (RRP) rule that established accreditation, training, certification... operate a training program for individuals who perform any of these activities. ``Target housing'' is...

  5. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  7. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  8. Sustainable Design Guidelines for the Construction of New Facilities and the Renovation of Existing Structures.

    ERIC Educational Resources Information Center

    Dorsey, Judy; L'Esperance, Clare

    This guide summarizes research conducted at Colorado's Poudre School District (PSD) to develop guidelines for the desired performance outcomes from employing sustainable educational facility design, and it suggests approaches for attaining them. The guide also provides case studies and references to further investigate opportunities on specific…

  9. Maryland Public School Standards for Information and Communications Distribution Systems in New Construction and Renovation Projects.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    Standards established by Maryland public schools for information and communication distribution systems in new construction and renovation projects are detailed. The function of the communications distribution room (CDR) is to house the distribution equipment of the school's communications systems and may contain gateways, tuners, video cassette…

  10. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  11. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  12. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  13. Acoustical renovation of temporary classrooms to meet American National Standards Institute (ANSI) standard

    NASA Astrophysics Data System (ADS)

    Lubman, David

    2005-09-01

    This exercise demonstrates that key requirements of the ANSI S12.60-2002 on classroom acoustics can be met through renovations at modest cost. Free-standing classrooms at two schools in Southern California were successfully renovated. Noise levels were greatly reduced, and now meet requirements of the ANSI standard. A 1950s style bungalow classroom at the Paradise Canyon School (PCS) in Los Angeles County and a double-trailer classroom at the Wildomar Elementary School (WES) in Riverside County were targeted. The aim was to make classrooms suitable for pupils with severe hearing disabilities. But the methods used apply equally to mainstream classrooms. At both schools the above-ceiling air distribution systems were modified to produce quiet airflow. At PCS, a noisy rooftop heat pump was replaced with a much quieter rooftop heat pump and installation. At WES, a noisy wall-mounted heat pump was replaced with a new unit mounted on an exterior concrete pad. At PCS, exterior noise intrusion was achieved by replacing a poorly performing accordion wall with a permanent wall. Further noise reduction can be achieved by replacing leaky windows. Exterior noise intrusion at WES was obtained by replacing leaky windows. The resulting acoustical improvements are documented. Costs and lessons learned are discussed.

  14. 16 CFR Figures 1 and 2 to Part 1204 - Suggested Instrumentation for Current Monitoring Device and High Voltage Facility

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Suggested Instrumentation for Current Monitoring Device and High Voltage Facility 1 Figures 1 and 2 to Part 1204 Commercial Practices CONSUMER... Instrumentation for Current Monitoring Device and High Voltage Facility EC03OC91.008 ...

  15. 16 CFR Figures 1 and 2 to Part 1204 - Suggested Instrumentation for Current Monitoring Device and High Voltage Facility

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Suggested Instrumentation for Current Monitoring Device and High Voltage Facility 1 Figures 1 and 2 to Part 1204 Commercial Practices CONSUMER... Instrumentation for Current Monitoring Device and High Voltage Facility EC03OC91.008 ...

  16. 16 CFR Figures 1 and 2 to Part 1204 - Suggested Instrumentation for Current Monitoring Device and High Voltage Facility

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Suggested Instrumentation for Current Monitoring Device and High Voltage Facility 1 Figures 1 and 2 to Part 1204 Commercial Practices CONSUMER... Instrumentation for Current Monitoring Device and High Voltage Facility EC03OC91.008 ...

  17. Middle-Aged Thinking.

    ERIC Educational Resources Information Center

    Nixon, Charles W.

    1998-01-01

    Examines renovation issues involving 30- and 40-year-old school facilities. Explores ways a school district can renovate old buildings to first-class cost-effective facilities while avoiding excessive transition costs. Discussions include installation of new technology and the resulting wiring demands, and developing more energy-efficient heating…

  18. 78 FR 4414 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... or Major Renovation of Tribal 5 1 20 100 Child Care Facilities Estimated Total Annual Burden Hours... OMB Review; Comment Request Title: Procedures for Requests from Tribal Lead Agencies to use Child Care and Development Fund (CCDF) Funds for Construction or Major Renovation of Child Care Facilities. OMB...

  19. E.C.I.A. Chapter 1, Part B, Institutionalized Facilities Program, 1989-90. OREA Report.

    ERIC Educational Resources Information Center

    Miller, Ronald C.

    This report evaluates a program funded under the Educational Consolidation and Improvement Act (ECIA), Chapter 1, Part B, in New York (New York). The Program for Neglected and Delinquent Children, District 75/Citywide Institutionalized Facilities Program provides after-school supplementary instruction in prevocational skills, activities of daily…

  20. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property...-based Paint Activities Firm Application $550 $550 Combined Renovation and Lead-based Paint Activities Tribal Firm Application $20 $20 Tribal Firm $20 $20 (2) Lost certificate. A $15 fee will be charged for...

  1. High School E.C.I.A. Chapter 1, Part B, Institutionalized Facilities Program 1989-90. State Report. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    This report describes and evaluates high school programs funded under Chapter 1, Part B, of the Education Consolidation and Improvement Act (ECIA) and administered by the Institutionalized Facilities Program of the New York City Public Schools in 1989-90. The program is designed to address the educational needs of students in facilities for…

  2. Renovation of a Mechanical Engineering Senior Design Class to an Industry-Tied and Team-Oriented Course

    ERIC Educational Resources Information Center

    Liu, Yucheng

    2017-01-01

    In this work, an industry-based and team-oriented education model was established based on a traditional mechanical engineering (ME) senior design class in order to better prepare future engineers and leaders so as to meet the increasing demand for high-quality engineering graduates. In the renovated curriculum, industry-sponsored projects became…

  3. Energia Renovable para Centros de Salud Rurales (Renewable Energy for Rural Health Clinics) (in Spanish)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jimenez, T.; Olson, K.

    Esta es la primera de una serie de guias de aplicaciones que el Programa de Energia de Villas de NREL esta comisionando para acoplar sistemas comerciales renovables con aplicaciones rurales, incluyendo agua, escuelas rurales y micro empresas. La guia esta complementada por las actividades de desarrollo del Programa de Energia de Villas de NREL, proyectos pilotos internacionales y programas de visitas profesionales.

  4. Some Effects of School Building Renovation on Pupil Attitudes and Behavior in Selected Junior High Schools.

    ERIC Educational Resources Information Center

    Cramer, Robert Joseph

    A study of 2,300 junior high school students from three schools determined the effect of a newly renovated school, a new school environment, and an old dilapidated school environment on their attitudes and behavior. Points were assigned to their answers; high scores indicated a positive attitude. Results show attitudes were lowest in the old…

  5. Final Environmental Assessment to Renovate Fourth Cliff Recreational Area at Hanscom Air Force Base, Massachusetts

    DTIC Science & Technology

    2014-11-17

    Renovate Fourth Cliff Recreational Annex Grading and topography changes may be necessary to design an appropriate drainage system at the site...goals: 1) Increase safety for personnel and patrons at the site; 2) Provide protection of the exposed cliff face from rainwater runoff; 3) Provide...be followed. Drainage design must meet Massachusetts Stormwater Management Standards, as well as comply with the Federal Clean Water Act. Solid

  6. Planning for progress, productivity, and performance.

    PubMed

    Benedict, J M

    1983-10-01

    A project is described for the interim renovation of a labor intensive existing foodservice facility. The renovated area will provide effective food management during the hospital's redevelopment period, including a new foodservice. Objectives of the interim project were to conserve labor while emphasizing control and centralization, provide economic foodservices with improved quality, and incorporate one tray distribution system throughout the hospital complex. Immediate measures were necessary in order to generate funds to proceed. Renovations had to occur without disrupting food-service to patients. The project was planned over a three year period and included an ingredient control area, two patient tray service centres, a renewed production kitchen and test kitchen facility. Each phase has been financed on the understanding that the costs of construction and equipment will be repaid within one fiscal year of operating the renovated facility. Positive results are being achieved, attributable to the support and encouragement received from staff during the change process.

  7. 76 FR 40912 - Notice of Availability of the Draft Environmental Assessment for the Renovation of the Charles F...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ..., evaluates, and documents the effects of the GSA renovating the Charles F. Prevedel Building, including the replacement of mechanical systems to meet high performance green building standards, and making needed... Building and Demolition of Federal Buildings 100, 101, and 102 at the Federal Records Center at Overland...

  8. Developing a plan for primary health care facilities in Soweto, South Africa. Part II: Applying locational criteria.

    PubMed

    Doherty, J; Rispel, L; Webb, N

    1996-12-01

    This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.

  9. 77 FR 61014 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...; asbestos & lead present; restricted area; contact AF for info. on accessibility/removal reqs. 38 Buildings.../renovations needed; asbestos & lead present; restricted area; contact AF for info. on accessibility/removal...; military housing; minor repairs/renovations needed; asbestos & lead present; restricted area; contact AF...

  10. The Renovation of Higher Education Governance in Vietnam and Its Impact on the Teaching Quality at Universities

    ERIC Educational Resources Information Center

    Pham, Thi Lan Phuong

    2012-01-01

    Significant changes in the policies of higher education in Vietnam have changed the structure and governance of the system since the mid-1990s. The most commonly agreed-upon positive outcome of the governance renovation process is that the formation of a nationwide quality assurance scheme, which is stimulated by accreditation, in the higher…

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  12. Design scenarios for renovation of sports complex: a case study

    NASA Astrophysics Data System (ADS)

    Nižetić, S.

    2018-02-01

    This paper elaborates design scenarios for a sports complex in Croatia from a technical and economic aspect. Different energy options are analysed and two are additionally addressed and discussed as the most viable ones. The possibilities of sports complex renovation are shown by properly choosing the appropriate energy concept and thus reducing the overall cost for produced thermal energy by around 33% and reducing the carbon dioxide emission by a factor of 1.8 in comparison with its present state. Finally, this study presents an example of good practice, where renewable energy solutions can be proposed and where it is possible to cover around 70-80% of overall yearly costs from achieved energy savings for the novel plant that is assumed to be financed through a bank loan.

  13. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  14. Poster Puzzler Solution: Taking in Air | Poster

    Cancer.gov

    The current Poster Puzzler image shows the top of Building 560, where a new supply air handler was recently installed by Facilities Maintenance and Engineering (FME) staff, as part of lab renovations in wing 1, floor 1. FME staff enlarged the attic of the building to make space for the air handler. Building 560, the largest building at the NCI at Frederick campus, houses about

  15. Approach for Estimating Exposures and Incremental Health Effects from Lead During Renovation, Repair, and Painting Activities in Public and Commercial Buildings

    EPA Science Inventory

    Approach for Estimating Exposures and Incremental Health Effects from Lead During Renovation, Repair, and Painting Activities in Public and Commercial Buildings” (Technical Approach Document). Also available for public review and comment are two supplementary documents: the detai...

  16. Optimal Decision Model for Sustainable Hospital Building Renovation-A Case Study of a Vacant School Building Converting into a Community Public Hospital.

    PubMed

    Juan, Yi-Kai; Cheng, Yu-Ching; Perng, Yeng-Horng; Castro-Lacouture, Daniel

    2016-06-24

    Much attention has been paid to hospitals environments since modern pandemics have emerged. The building sector is considered to be the largest world energy consumer, so many global organizations are attempting to create a sustainable environment in building construction by reducing energy consumption. Therefore, maintaining high standards of hygiene while reducing energy consumption has become a major task for hospitals. This study develops a decision model based on genetic algorithms and A* graph search algorithms to evaluate existing hospital environmental conditions and to recommend an optimal scheme of sustainable renovation strategies, considering trade-offs among minimal renovation cost, maximum quality improvement, and low environmental impact. Reusing vacant buildings is a global and sustainable trend. In Taiwan, for example, more and more school space will be unoccupied due to a rapidly declining birth rate. Integrating medical care with local community elder-care efforts becomes important because of the aging population. This research introduces a model that converts a simulated vacant school building into a community public hospital renovation project in order to validate the solutions made by hospital managers and suggested by the system. The result reveals that the system performs well and its solutions are more successful than the actions undertaken by decision-makers. This system can improve traditional hospital building condition assessment while making it more effective and efficient.

  17. 43 CFR 17.217 - Existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Existing facilities. 17.217 Section 17.217... facilities. (a) Accessibility. A recipient shall operate each program or activity so that when each part is... not require a recipient to make each of its existing facilities or every part of a facility accessible...

  18. Approach for Estimating Exposures and Incremental Health Effects from Lead Due to Renovation Repair and Painting Activities in Public and Commercial Buildings

    EPA Pesticide Factsheets

    Approach for Estimating Exposures and Incremental Health Effects from Lead Due to Renovation Repair and Painting Activities in Public and Commercial Buildings: links to documents at www.regulations.gov, links to PDFs related to Approach document

  19. Making a Splash.

    ERIC Educational Resources Information Center

    Maland, Jim

    1998-01-01

    Presents a 10-step process that allows swimming-pool owners to objectively scrutinize their existing facility's needs, construction, and operation and maintenance budgets before renovating a structurally deficient or costly pool. Four examples of problems involving pool-renovation decision making are highlighted. (GR)

  20. ESTE Project Brief: Environmental and Sustainable Technology Evaluations (ESTE): Verification of Qualitative Spot Test Kits for Lead in Paint

    EPA Science Inventory

    On April 22, 2008, EPA issued the final Lead; Renovation, Repair, and Painting (RRP) Program Rule. The rule addresses lead-based paint hazards created by renovation, repair, and painting activities that disturb lead-based paint in target housing and child-occupied facilities. Und...

  1. Prototype Facility Educational Specifications.

    ERIC Educational Resources Information Center

    Idaho State Div. of Professional-Technical Education, Boise.

    This document presents prototypical educational specifications to guide the building and renovation of Idaho vocational schools so they can help communities meet the advanced, professional-technical programs of the future. The specifications start with points to consider when determining school site suitability. The document then sets forth…

  2. Interior Dialogues: Library Design Speaks Volumes to Users.

    ERIC Educational Resources Information Center

    Kniffel, Leonard

    1992-01-01

    Photo essay illustrates library interiors of 20 newly built or renovated libraries ranging from renovated Carnegies to multimillion dollar university pantheons. Facilities represent academic libraries, public libraries (including children's and young adult's sections), a history library, a medical library, and a corporate library. Names and…

  3. District 75/Citywide E.C.I.A. Chapter 1, Part B, Institutionalized Facilities Program. Summer 1989. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    This report evaluates a program funded under Chapter 1, Part B, of the Education Consolidation and Improvement Act in New York (New York). The New York City Division of Special Education administers the Institutionalized Facilities Program to provide instruction to neglected and delinquent children and adolescents residing in group homes and…

  4. Honeycomblike large area LaB6 plasma source for Multi-Purpose Plasma facility

    NASA Astrophysics Data System (ADS)

    Woo, Hyun-Jong; Chung, Kyu-Sun; You, Hyun-Jong; Lee, Myoung-Jae; Lho, Taihyeop; Choh, Kwon Kook; Yoon, Jung-Sik; Jung, Yong Ho; Lee, Bongju; Yoo, Suk Jae; Kwon, Myeon

    2007-10-01

    A Multi-Purpose Plasma (MP2) facility has been renovated from Hanbit mirror device [Kwon et al., Nucl. Fusion 43, 686 (2003)] by adopting the same philosophy of diversified plasma simulator (DiPS) [Chung et al., Contrib. Plasma Phys. 46, 354 (2006)] by installing two plasma sources: LaB6 (dc) and helicon (rf) plasma sources; and making three distinct simulators: divertor plasma simulator, space propulsion simulator, and astrophysics simulator. During the first renovation stage, a honeycomblike large area LaB6 (HLA-LaB6) cathode was developed for the divertor plasma simulator to improve the resistance against the thermal shock fragility for large and high density plasma generation. A HLA-LaB6 cathode is composed of the one inner cathode with 4in. diameter and the six outer cathodes with 2in. diameter along with separate graphite heaters. The first plasma is generated with Ar gas and its properties are measured by the electric probes with various discharge currents and magnetic field configurations. Plasma density at the middle of central cell reaches up to 2.6×1012 cm-3, while the electron temperature remains around 3-3.5eV at the low discharge current of less than 45A, and the magnetic field intensity of 870G. Unique features of electric property of heaters, plasma density profiles, is explained comparing with those of single LaB6 cathode with 4in. diameter in DiPS.

  5. Honeycomblike large area LaB6 plasma source for Multi-Purpose Plasma facility.

    PubMed

    Woo, Hyun-Jong; Chung, Kyu-Sun; You, Hyun-Jong; Lee, Myoung-Jae; Lho, Taihyeop; Choh, Kwon Kook; Yoon, Jung-Sik; Jung, Yong Ho; Lee, Bongju; Yoo, Suk Jae; Kwon, Myeon

    2007-10-01

    A Multi-Purpose Plasma (MP(2)) facility has been renovated from Hanbit mirror device [Kwon et al., Nucl. Fusion 43, 686 (2003)] by adopting the same philosophy of diversified plasma simulator (DiPS) [Chung et al., Contrib. Plasma Phys. 46, 354 (2006)] by installing two plasma sources: LaB(6) (dc) and helicon (rf) plasma sources; and making three distinct simulators: divertor plasma simulator, space propulsion simulator, and astrophysics simulator. During the first renovation stage, a honeycomblike large area LaB(6) (HLA-LaB(6)) cathode was developed for the divertor plasma simulator to improve the resistance against the thermal shock fragility for large and high density plasma generation. A HLA-LaB(6) cathode is composed of the one inner cathode with 4 in. diameter and the six outer cathodes with 2 in. diameter along with separate graphite heaters. The first plasma is generated with Ar gas and its properties are measured by the electric probes with various discharge currents and magnetic field configurations. Plasma density at the middle of central cell reaches up to 2.6 x 10(12) cm(-3), while the electron temperature remains around 3-3.5 eV at the low discharge current of less than 45 A, and the magnetic field intensity of 870 G. Unique features of electric property of heaters, plasma density profiles, is explained comparing with those of single LaB(6) cathode with 4 in. diameter in DiPS.

  6. An Analysis of Attendance Patterns in the Experimental Food Service System at Travis Air Force Base

    DTIC Science & Technology

    1974-12-01

    Food Service System Study was undertaken to develop wideranging improvements in current Air Force food service operations. Of particular concern was the need to increase consumer attendance and utilization of the dining facilities. A number of changes were implemented during the experiment including menu modifications, dining hall renovations, and the introduction of three new food service operations - a modular fast food unit, a flight line facility, and an ethnic, specialty meal service provided by one of the renovated dining

  7. 18 CFR Appendix A to Part 2 - Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL...

  8. Pawcatuck School.

    ERIC Educational Resources Information Center

    Randall, Kathleen

    1993-01-01

    Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)

  9. A Clean Bill of Health.

    ERIC Educational Resources Information Center

    American School & University, 1998

    1998-01-01

    Explores the steps to take to reduce the likelihood that indoor-air-quality (IAQ) problems will develop in educational facilities. Highlights sources and hazards of IAQ when renovating buildings; control strategies and the establishment of IAQ close-out criteria for all renovation projects; heating, ventilation, and air-conditioning system…

  10. Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume II: Field and laboratory reports, Part 2 of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigo, H.G.; Chandler, A.J.

    Volume II (part 2 of 2) of ''Retrofit of Waste-to-energy Facilities Equipped with Electrostatic Precipitators'' contains the field and laboratory reports, including: (1) field reports, (2) analytic laboratory reports, (3) chain of custody forms, and (4) TCLP laboratory reports.

  11. Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume II: Field and Laboratory Reports, Part 1 of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigo, H.G.; Chandler, A.J.

    1996-04-01

    Volume II (part 1 of 2) of ''Retrofit of Waste-to-energy Facilities Equipped with Electrostatic Precipitators'' contains the documentation and raw data, including: (1) field reports, (2) analytic laboratory reports, (3) chain of custody forms, and (4) TCLP laboratory reports.

  12. 16 CFR Figures 3 and 4 to Part 1204 - High Voltage Test Facility and Antenna System Test Setup

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false High Voltage Test Facility and Antenna System Test Setup 3 Figures 3 and 4 to Part 1204 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SAFETY STANDARD FOR OMNIDIRECTIONAL CITIZENS BAND BASE STATION ANTENNAS Pt. 1204, Figs. 3, 4 Figures 3 and 4...

  13. Investigation of injury/illness data at a nuclear facility. Part II

    DOE PAGES

    Cournoyer, Michael E.; Garcia, Vincent E.; Sandoval, Arnold N.; ...

    2015-07-01

    At Los Alamos National Laboratory (LANL), there are several nuclear facilities, accelerator facilities, radiological facilities, explosives sites, moderate- and high-hazard non-nuclear facilities, biosciences laboratory, etc. The Plutonium Science and Manufacturing Directorate (ADPSM) provides special nuclear material research, process development, technology demonstration, and manufacturing capabilities. ADPSM manages the LANL Plutonium Facility. Within the Radiological Control Area at TA-55 (PF-4), chemical and metallurgical operations with plutonium and other hazardous materials are performed. LANL Health and Safety Programs investigate injury and illness data. In this study, statistically significant trends have been identified and compared for LANL, ADPSM, and PF-4 injury/illness cases. A previouslymore » described output metric is used to measures LANL management progress towards meeting its operational safety objectives and goals. Timelines are used to determine trends in Injury/Illness types. Pareto Charts are used to prioritize causal factors. The data generated from analysis of Injury/Illness data have helped identify and reduce the number of corresponding causal factors.« less

  14. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  15. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...

  16. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  17. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...

  18. 42 CFR 440.140 - Inpatient hospital services, nursing facility services, and intermediate care facility services...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...

  19. Facility Focus: Residence Halls.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Describes residence halls seeking to meet needs beyond traditional mass housing for the 18- to 22-year-old students: Whittemore Hall at the Tuck School of Business at Dartmouth College (for older students); Small Group Housing at Washington University (grouping students with common interests); and the renovation of the residence hall at Boston's…

  20. 40 CFR 745.86 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that no pregnant woman resides there, a declaration that the housing is not a child-occupied facility... the work practices to be used during the renovation will not necessarily include all of the lead-safe work practices contained in EPA's renovation, repair, and painting rule, the signature of the owner...

  1. 40 CFR 260.22 - Petitions to amend part 261 to exclude a waste produced at a particular facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (c) If the waste is listed with codes “I”, “C”, “R”, or “E”, in subpart D, (1) The petitioner must... waste by operation of subpart C of part 261. (e) If the waste is listed with the code “H” in subpart D... a waste produced at a particular facility. 260.22 Section 260.22 Protection of Environment...

  2. 40 CFR 260.22 - Petitions to amend part 261 to exclude a waste produced at a particular facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (c) If the waste is listed with codes “I”, “C”, “R”, or “E”, in subpart D, (1) The petitioner must... waste by operation of subpart C of part 261. (e) If the waste is listed with the code “H” in subpart D... a waste produced at a particular facility. 260.22 Section 260.22 Protection of Environment...

  3. 40 CFR 260.22 - Petitions to amend part 261 to exclude a waste produced at a particular facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (c) If the waste is listed with codes “I”, “C”, “R”, or “E”, in subpart D, (1) The petitioner must... waste by operation of subpart C of part 261. (e) If the waste is listed with the code “H” in subpart D... a waste produced at a particular facility. 260.22 Section 260.22 Protection of Environment...

  4. 40 CFR 260.22 - Petitions to amend part 261 to exclude a waste produced at a particular facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (c) If the waste is listed with codes “I”, “C”, “R”, or “E”, in subpart D, (1) The petitioner must... waste by operation of subpart C of part 261. (e) If the waste is listed with the code “H” in subpart D... a waste produced at a particular facility. 260.22 Section 260.22 Protection of Environment...

  5. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit applicationmore » guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than

  6. Technical Support Document: Development of the Advanced Energy Design Guide for Large Hospitals - 50% Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnema, E.; Leach, M.; Pless, S.

    2013-06-01

    This Technical Support Document describes the process and methodology for the development of the Advanced Energy Design Guide for Large Hospitals: Achieving 50% Energy Savings Toward a Net Zero Energy Building (AEDG-LH) ASHRAE et al. (2011b). The AEDG-LH is intended to provide recommendations for achieving 50% whole-building energy savings in large hospitals over levels achieved by following Standard 90.1-2004. The AEDG-LH was created for a 'standard' mid- to large-size hospital, typically at least 100,000 ft2, but the strategies apply to all sizes and classifications of new construction hospital buildings. Its primary focus is new construction, but recommendations may be applicablemore » to facilities undergoing total renovation, and in part to many other hospital renovation, addition, remodeling, and modernization projects (including changes to one or more systems in existing buildings).« less

  7. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmentalmore » restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.« less

  8. Renovating the Pyramid of Needs: Contemporary Extensions Built Upon Ancient Foundations

    PubMed Central

    Kenrick, Douglas T.; Griskevicius, Vladas; Neuberg, Steven L.; Schaller, Mark

    2011-01-01

    Maslow’s pyramid of human needs, proposed in 1943, has been one of the most cognitively contagious ideas in the behavioral sciences. Anticipating later evolutionary views of human motivation and cognition, Maslow viewed human motives as based in innate and universal predispositions. We revisit the idea of a motivational hierarchy in light of theoretical developments at the interface of evolutionary biology, anthropology, and psychology. After considering motives at three different levels of analysis, we argue that the basic foundational structure of the pyramid is worth preserving, but that it should be buttressed with a few architectural extensions. By adding a contemporary design feature, connections between fundamental motives and immediate situational threats and opportunities should be highlighted. By incorporating a classical element, these connections can be strengthened by anchoring the hierarchy of human motives more firmly in the bedrock of modern evolutionary theory. We propose a renovated hierarchy of fundamental motives that serves as both an integrative framework and a generative foundation for future empirical research. PMID:21874133

  9. Building Energy-Efficient Schools in New Orleans: Lessons Learned (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This case study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. Hurricane Katrina was the largest natural disaster in the United States, striking the Gulf Coast on August 29, 2005, and flooding 80% of New Orleans; to make matters worse, the city was flooded again only three weeks later by the effects of Hurricane Rita. Many of the buildings, including schools, were heavily damaged. The devastation of schools in New Orleans from the hurricanes was exacerbated by many years of deferred school maintenance. This casemore » study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. The experiences of four new schools-Langston Hughes Elementary School, Andrew H. Wilson Elementary School (which was 50% new construction and 50% major renovation), L.B. Landry High School, and Lake Area High School-and one major renovation, Joseph A. Craig Elementary School-are described to help other school districts and design teams with their in-progress and future school building projects in hot-humid climates. Before Hurricane Katrina, New Orleans had 128 public schools. As part of the recovery planning, New Orleans Public Schools underwent an assessment and planning process to determine how many schools were needed and in what locations. Following a series of public town hall meetings and a district-wide comprehensive facility assessment, a Master Plan was developed, which outlined the renovation or construction of 85 schools throughout the city, which are expected to be completed by 2017. New Orleans Public Schools expects to build or renovate approximately eight schools each year over a 10-year period to achieve 21st century schools district-wide. Reconstruction costs are estimated at nearly $2 billion.« less

  10. Chemical exposures in recently renovated low-income housing: Influence of building materials and occupant activities.

    PubMed

    Dodson, Robin E; Udesky, Julia O; Colton, Meryl D; McCauley, Martha; Camann, David E; Yau, Alice Y; Adamkiewicz, Gary; Rudel, Ruthann A

    2017-12-01

    Health disparities in low-income communities may be linked to residential exposures to chemicals infiltrating from the outdoors and characteristics of and sources in the home. Indoor sources comprise those introduced by the occupant as well as releases from building materials. To examine the impact of renovation on indoor pollutants levels and to classify chemicals by predominant indoor sources, we collected indoor air and surface wipes from newly renovated "green" low-income housing units in Boston before and after occupancy. We targeted nearly 100 semivolatile organic compounds (SVOCs) and volatile organic compounds (VOCs), including phthalates, flame retardants, fragrance chemicals, pesticides, antimicrobials, petroleum chemicals, chlorinated solvents, and formaldehyde, as well as particulate matter. All homes had indoor air concentrations that exceeded available risk-based screening levels for at least one chemical. We categorized chemicals as primarily influenced by the occupant or as having building-related sources. While building-related chemicals observed in this study may be specific to the particular housing development, occupant-related findings might be generalizable to similar communities. Among 58 detected chemicals, we distinguished 25 as primarily occupant-related, including fragrance chemicals 6-acetyl-1,1,2,4,4,7-hexamethyltetralin (AHTN) and 1,3,4,6,7,8-hexahydro-4,6,6,7,8,8-hexamethylcyclopenta[g]-2-benzopyran (HHCB). The pre- to post-occupancy patterns of the remaining chemicals suggested important contributions from building materials for some, including dibutyl phthalate and xylene, whereas others, such as diethyl phthalate and formaldehyde, appeared to have both building and occupant sources. Chemical classification by source informs multi-level exposure reduction strategies in low-income housing. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  11. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... implementing both short-range and long-range projects. Proposed facility improvements and phased construction... Institute Foreign Language Center (DLIFLC). Facilities, construction, improvements, renovations... have modern facilities consistent with Army standards well into the 21st Century. The overall goal is...

  12. 10 CFR 4.127 - Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Existing facilities. 4.127 Section 4.127 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.127 Existing facilities. (a) Accessibility. A recipient... make each of its existing facilities or every part of an existing facility accessible to and usable by...

  13. 10 CFR 1040.72 - Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy... § 1040.72 Existing facilities. (a) Accessibility. A recipient shall operate any program or activity to... facilities or every part of a facility accessible to and useable by handicapped persons. (b) Methods. A...

  14. 33 CFR 6.01-4 - Waterfront facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Waterfront facility. 6.01-4... PROTECTION AND SECURITY OF VESSELS, HARBORS, AND WATERFRONT FACILITIES Definitions § 6.01-4 Waterfront facility. Waterfront facility. “Waterfront facility,” as used in this part, means all piers, wharves, docks...

  15. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  16. KSC-06pd1203

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  17. KSC-06pd1202

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  18. KSC-06pd1201

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  19. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  20. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  1. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  2. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  3. 14 CFR 1251.301 - Existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... HANDICAP Accessibility § 1251.301 Existing facilities. (a) Accessibility. A recipient shall operate each... readily accessible to handicapped persons. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by handicapped persons. (b...

  4. 14 CFR 1251.301 - Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... HANDICAP Accessibility § 1251.301 Existing facilities. (a) Accessibility. A recipient shall operate each... readily accessible to handicapped persons. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by handicapped persons. (b...

  5. 14 CFR 1251.301 - Existing facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HANDICAP Accessibility § 1251.301 Existing facilities. (a) Accessibility. A recipient shall operate each... readily accessible to handicapped persons. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by handicapped persons. (b...

  6. 14 CFR 1251.301 - Existing facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HANDICAP Accessibility § 1251.301 Existing facilities. (a) Accessibility. A recipient shall operate each... readily accessible to handicapped persons. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by handicapped persons. (b...

  7. High-pressure water facility

    NASA Technical Reports Server (NTRS)

    2006-01-01

    NASA Test Operations Group employees, from left, Todd Pearson, Tim Delcuze and Rodney Wilkinson maintain a water pump in Stennis Space Center's high-pressure water facility. The three were part of a group of employees who rode out Hurricane Katrina at the facility and helped protect NASA's rocket engine test complex.

  8. High-pressure water facility

    NASA Image and Video Library

    2006-02-15

    NASA Test Operations Group employees, from left, Todd Pearson, Tim Delcuze and Rodney Wilkinson maintain a water pump in Stennis Space Center's high-pressure water facility. The three were part of a group of employees who rode out Hurricane Katrina at the facility and helped protect NASA's rocket engine test complex.

  9. Renovating the Pyramid of Needs: Contemporary Extensions Built Upon Ancient Foundations.

    PubMed

    Kenrick, Douglas T; Griskevicius, Vladas; Neuberg, Steven L; Schaller, Mark

    2010-05-01

    Maslow's pyramid of human needs, proposed in 1943, has been one of the most cognitively contagious ideas in the behavioral sciences. Anticipating later evolutionary views of human motivation and cognition, Maslow viewed human motives as based in innate and universal predispositions. We revisit the idea of a motivational hierarchy in light of theoretical developments at the interface of evolutionary biology, anthropology, and psychology. After considering motives at three different levels of analysis, we argue that the basic foundational structure of the pyramid is worth preserving, but that it should be buttressed with a few architectural extensions. By adding a contemporary design feature, connections between fundamental motives and immediate situational threats and opportunities should be highlighted. By incorporating a classical element, these connections can be strengthened by anchoring the hierarchy of human motives more firmly in the bedrock of modern evolutionary theory. We propose a renovated hierarchy of fundamental motives that serves as both an integrative framework and a generative foundation for future empirical research. © The Author(s) 2010.

  10. Renovation And Adaptation Of The Historic Olsztyn Purification House Bet Tahara Into A Public Utility Building

    NASA Astrophysics Data System (ADS)

    Deja, Barbara Maria

    2015-09-01

    The historic Jewish Purification House Bet Tahara was erected in Olsztyn in 1913 on the basis of the debut design of Erich Mendelsohn, a world-famous architect born in Olsztyn. The most valuable element of the building is a self-supporting pyramid vault above a mourning hall. The paper presents the interesting structure of the building, its technical condition before renovation, as well as the scope of work involved in adapting it into a public utility building - MENDELSOHN HOUSE Intercultural Dialogue Centre. The undertaking was executed thanks to the commitment of the building's leaseholder - "Borussia" Cultural Community Association, which raised money for this goal from public funds.

  11. The HVAC Challenges of Upgrading an Old Lab for High-end Light Microscopes

    PubMed Central

    Richard, R.; Martone, P.; Callahan, L.M.

    2014-01-01

    The University of Rochester Medical Center forms the centerpiece of the University of Rochester's health research, teaching, patient care, and community outreach missions. Within this large facility of over 5 million square feet, demolition and remodeling of existing spaces is a constant activity. With more than $145 million in federal research funding, lab space is frequently repurposed and renovated to support this work. The URMC Medical Center Facilities Organization supporting small to medium space renovations is constantly challenged and constrained by the existing mechanical infrastructure and budgets to deliver a renovated space that functions within the equipment environmental parameters. One recent project, sponsored by the URMC Shared Resources Laboratory, demonstrates these points. The URMC Light Microscopy Shared Resource Laboratory requested renovation of a 121 sq. ft. room in a 40 year old building which would enable placement of a laser capture microdissection microscope and a Pascal 5 laser scanning confocal microscope with the instruments separated by a blackout curtain. This poster discusses the engineering approach implemented to bring an older lab into the environmental specifications needed for the proper operation of the high-end light microscopes.

  12. Beamlines of the Biomedical Imaging and Therapy Facility at the Canadian Light Source - Part 2

    NASA Astrophysics Data System (ADS)

    Wysokinski, T. W.; Chapman, D.; Adams, G.; Renier, M.; Suortti, P.; Thomlinson, W.

    2013-03-01

    The BioMedical Imaging and Therapy (BMIT) facility provides a world class facility with unique synchrotron-specific imaging and therapy capabilities. This paper describes Insertion Device (ID) beamline 05ID-2 with the beam terminated in the first experimental hutch: POE-2. The experimental methods available in POE-2 include: Microbeam Radiation Therapy (MRT), Synchrotron Stereotactic Radiation Therapy (SSRT) and absorption imaging (projection and Computed Tomography (CT)). The source for the ID beamline is a multi-pole superconductive 4.3 T wiggler, which can generate ~30 kW of radiative power and deliver dose as high as 3000 Gy/s required for MRT program. The optics in POE-1 hutch prepares either monochromatic or filtered white beam that is used in POE-2. The Double Crystal (DC), bent Laue monochromator will prepare a beam over 10 cm wide at sample point, while spanning an energy range appropriate for imaging studies of animals (20-100+ keV). The experimental hutch will have a flexible positioning system that can handle subjects up to 120 kg. Several different cameras will be available with resolutions ranging from 4 μm to 150 μm. The latest update on the status of 05B1-1 bending magnet (BM) beamline, described in Part 1 [1], is also included.

  13. Acoustical considerations for secondary uses of government facilities

    NASA Astrophysics Data System (ADS)

    Evans, Jack B.

    2003-10-01

    Government buildings are by their nature, public and multi-functional. Whether in meetings, presentations, documentation processing, work instructions or dispatch, speech communications are critical. Full-time occupancy facilities may require sleep or rest areas adjacent to active spaces. Rooms designed for some other primary use may be used for public assembly, receptions or meetings. In addition, environmental noise impacts to the building or from the building should be considered, especially where adjacent to hospitals, hotels, apartments or other urban sensitive land uses. Acoustical criteria and design parameters for reverberation, background noise and sound isolation should enhance speech intelligibility and privacy. This presentation looks at unusual spaces and unexpected uses of spaces with regard to room acoustics and noise control. Examples of various spaces will be discussed, including an atrium used for reception and assembly, multi-jurisdictional (911) emergency control center, frequent or long-duration use of emergency generators, renovations of historically significant buildings, and the juxtaposition of acoustically incompatible functions. Brief case histories of acoustical requirements, constraints and design solutions will be presented, including acoustical measurements, plan illustrations and photographs. Acoustical criteria for secondary functional uses of spaces will be proposed.

  14. School Facilities and Tax Credit Bonds

    ERIC Educational Resources Information Center

    Edelstein, Frederick S.

    2009-01-01

    The tax credit portion of the American Recovery and Reinvestment Act of 2009 (also known as the economic stimulus package or ARRA) has three different entities that can be used for various school construction including new, modernization, renovation and acquisition of sites for school projects. The bond rule notice and allocations have been issued…

  15. Defense Energy Support Center Fact Book FY 2007

    DTIC Science & Technology

    2008-03-21

    3 M 21 years Fort Monmouth, NJ Lighting Upgrade, HVAC Renovation , UESC Implementation, GHP, Cogeneration System Site Preparation/Feasibility Ameresco...behalf of Navy Installations in the Sicily, Sardinia and Campania regions of Italy . Awards were made to two companies, ENEL Energia and Energia y...funded $333 million for SRM projects to maintain and renovate military Services owned fuels facilities worldwide . This amount was nearly double the

  16. Building better healthcare facilities through evidence-based design: breaking new ground at Vancouver Island Health Authority.

    PubMed

    Waldner, Howard; Johnson, Bart; Sadler, Blair

    2012-01-01

    Many of today's healthcare facilities were constructed at least 50 years ago, and a growing number have outlived their useful lives. Despite renovations and renewals, they often fall short of providing an appropriate care setting. Clinicians and staff develop a mixture of compromises and workarounds simply to make things function. Evidence-based design principles are often absent from new healthcare facilities, perhaps because of lack of awareness of the principles or because implementing them may fall foul of short-term and short-sighted budgetary decisions. In planning a new healthcare facility in 2008, the executive team at Vancouver Island Health Authority decided to adopt the evidence-based design approach. They conducted site visits to newly constructed hospitals across North America and beyond, to determine best practices in terms of design and construction. These engagements resulted in the implementation of 102 evidence-based design principles and attributes in Victoria's Royal Jubilee hospital, a 500-bed Patient Care Centre. This $350M project was completed on time and on budget, showing that using evidence need not result in delays or higher costs. To date, the results of the evidence-based design are promising, with accolades coming from patients, staff and clinical partners, and a number of immediate and practical benefits for patients, families and care teams alike. Copyright © 2012 Longwoods Publishing.

  17. 43 CFR 17.550 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Program accessibility: Existing facilities....550 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or... its existing facilities or every part of a facility accessible to and usable by handicapped persons...

  18. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  19. 76 FR 70118 - Notice of Public Meetings for the Draft Environmental Impact Statement for Basing of MV-22 and H...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... and parking apron improvements; construction of additional bachelor enlisted quarters (BEQs... MCB Hawaii Kaneohe Bay, types of basing facilities that are required, improvements at training areas... construction, replacement, and renovation of facilities at MCB Hawaii Kaneohe Bay, and include improvements to...

  20. School Facilities and Deferred Maintenance. Issuegram 43.

    ERIC Educational Resources Information Center

    McGuire, C. Kent

    School systems have been forced to postpone purchases of new equipment and to defer repair and renovation projects. At present, 39 states provide support for local school district capital expenditures through five primary mechnanisms: full state assumption, state/local sharing, state flat grant, state equalizing grant, and state loans. In response…

  1. Design Problems With Renovating And Adapting An Old Mill On The Example Of The Execution Of An Original Project

    NASA Astrophysics Data System (ADS)

    Grzonka, Aleksandra

    2015-12-01

    Nowadays, postindustrial areas and buildings are becoming more and more valuable. Very popular are those with special historical and architectural values, which are additionally located in large cities. The situation of those possessing fewer attributes encouraging their adaptation is worse. Sometimes, however, there are reasons why a decision is made to invest in such buildings despite the many difficulties connected with the implementation of these investments. This situation was presented on the example of the renovation and adaptation of an old electric mill in Łaziec into a restaurant.

  2. 9 CFR 3.3 - Sheltered housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.3 Sheltered housing facilities. (a) Heating, cooling, and temperature. The sheltered part of sheltered housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  3. 9 CFR 3.3 - Sheltered housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.3 Sheltered housing facilities. (a) Heating, cooling, and temperature. The sheltered part of sheltered housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  4. Coronary revascularization in Japan. Part 2: comparison of facilities between 1997 and 1999.

    PubMed

    Tsuchihashi, M; Tsutsui, H; Shihara, M; Shigematsu, H; Yamamoto, S; Koike, G; Kono, S; Takeshita, A

    2001-12-01

    A nation-wide survey on the procedures and facilities of coronary revascularization, percutaneous coronary intervention (PCI) and coronary artery bypass grafting (CABG) conducted by the Japanese Coronary Intervention Study (JCIS) group during 1997 revealed that PCI is more often used than CABG and is mainly carried out in low-volume facilities without surgical backup. The present study aimed to investigate the temporal changes in the usage of revascularization therapies and facilities from 1997 to 1999. A questionnaire was mailed in 1998 to the delegates of 1,086 PCI and 582 CABG facilities identified by the previous survey, and 89% of PCIs surveyed and 94% of CABGs surveyed reported back. The number of PCI procedures had increased by 19% from 97,831 to 116,479 and that of CABG procedures also increased by 21% from 16,374 to 19,846. The ratio of PCI to CABG was 5.9 in 1999, showing no significant change from 6.0 in 1997. In parallel, the number of PCI and CABG facilities increased from 888 to 941 and from 442 to 453, respectively. The use of coronary stents and other interventional devices increased during these 2 years. Coronary stents were used regardless of the annual procedural volume of the facilities, whereas other interventional devices, directional and rotational coronary atherectomy, were used mainly in the high-volume laboratories (p<0.01). Beating-heart, off-pump CABG had increased from 2% to 11% of total cases. Continued monitoring of trends in PCI and CABG facilities and procedures will be needed for nation-wide assessment of the use of new technology.

  5. Renovation of Large-Panel Buildings in Context of Urban Renewal/ Remonty Budynków Wielkopłytowych, Jako Element Rewitalizacji Miast

    NASA Astrophysics Data System (ADS)

    Ligęza, Wiesław

    2015-06-01

    The article presents issues connected with renovating multi-storey precast concrete buildings, resulting from the consequences of construction defects occurring over the course of the building process and use of the buildings, as well as design flaws and construction defects when insulating external partitions. Analyses and conclusions which stem from them cover issues of renovation in the light of: damage in the vertical and horizontal joints, damage to the connection of layers in three-layer load-bearing and curtain walls, the effect of the damage on the possibilities of carrying out functional modernization of residential units, the effect of the damage on the effectiveness of thermo-modernization - new problems related to faulty insulation W artykule przedstawiono zagadnienia remontowe w budynkach wielkopłytowych wynikające ze skutków wad budowlanych powstałych w czasie budowy i eksploatacji oraz wad projektowych i wykonawczych przy realizacji docieplenia przegród zewnętrznych. Analizy i wynikające z nich wnioski obejmują zagadnienia remontowe w świetle: uszkodzeń w złączach pionowych i poziomych, uszkodzeń połączenia warstw w ścianach trójwarstwowych nośnych i osłonowych, wpływu uszkodzeń na możliwości modernizacji funkcjonalnej lokali mieszkalnych, wpływu uszkodzeń na skuteczność termomodernizacji - nowe problemy w aspekcie źle wykonanego ocieplenia.

  6. NIST Document Sharing Test Facility

    Science.gov Websites

    NIST Document Sharing Test Facility This site supports the IHE effort in Document Sharing as part . This test facility is based on the IHE IT Infrastructure Technical Framework. All testing done against that Patient IDs be pre-registered before submitting metadata about them. To allocate new patient IDs

  7. College and University Facilities Survey. Part 5: Enrollment and Facilities of New Colleges and Universities Opening Between 1961 and 1965.

    ERIC Educational Resources Information Center

    Robbins, Leslie F.; Bokelman, W. Robert

    Facilities data for 181 colleges opened between 1961 and 1965 are summarized. Data from the survey suggests the institutional characteristics, type and purpose of the new colleges, and the trends in enrollment distribution. The facilities of the new colleges are tabulated according to new construction and rehabilitation costs by categories of…

  8. Monitoring steel bridge renovation using lead isotopic tracing.

    PubMed

    Salome, Fred; Gulson, Brian; Chiaradia, Massimo; Davis, Jeffrey; Morris, Howard

    2017-05-01

    Monitoring removal of lead (Pb) paint from steel structures usually involves analysis of environmental samples for total lead and determination of blood Pb levels of employees involved in the Pb paint removal. We used high precision Pb isotopic tracing for a bridge undergoing Pb paint removal to determine if Pb in the environmental and blood samples originated from the bridge paint. The paint system on the bridge consisted of an anti-corrosive red Pb primer top-coated with a Micaceous Iron Oxide (MIO) alkyd. Analysis of the red Pb primer gave uniform isotopic ratios indicative of Pb from the geologically-ancient Broken Hill mines in western New South Wales, Australia. Likewise waste abrasive material, as anticipated, had the same isotopic composition as the paint. The isotopic ratios for other samples lay on 2 separate linear arrays on a 207 Pb/ 204 Pb versus 206 Pb/ 204 Pb diagram, one largely defined by gasoline and the majority of the ambient air data, and the other by data for one sample each of gasoline and ambient air and underwater sediments. Isotopic ratios in background ambient air samples for the project were characteristic of leaded gasoline. Air sampling during paint removal showed a contribution of paint Pb ranging from about 20 to 40%. Isotopic ratios in the blood of 8 employees prior to the commencement of work showed that 6 of these had been previously exposed to the Broken Hill Pb possibly from earlier bridge paint removal projects. One subject appeared to have increased exposure to Pb probably from the paint renovations. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Renovated, repurposed, and still "one sweet library": a case study on loss of space from the Health Sciences and Human Services Library, University of Maryland, Baltimore.

    PubMed

    Tooey, Mary Joan M J

    2010-01-01

    The Health Sciences and Human Services Library (HS/HSL), University of Maryland, Baltimore (UMB), is located in an urban environment on the west side of downtown Baltimore. Founded in 1813, the library opened its current building in 1998 and is one of the largest health sciences libraries in the United States, with 6 floors and over 180,000 gross square and 118,000 net assignable square feet (NASF). The initial discussions in late 2005 involved moving campus offices into the library. Almost immediately, it was recognized that a much larger renovation was needed due to the scope of the work. The vice president for academic affairs, the library executive director, and campus planners agreed that if the renovation was done thoughtfully, multiple needs could be met, including new office spaces, better user spaces, and synergy with the new campus center being built next door. The planning, design, and construction process was multifaceted and on a fast track. Although the final piece of the renovation was completed in June 2009, the majority of the planning, design, and construction took place between March 2006 and June 2008. All tenants were involved with office design. Library staff were involved in designing the public spaces and planning the strategy for weeding and shifting. Approximately 8,000 NASF was reallocated to new office space from shelving space, amounting to approximately 6.7% of the building NASF and approximately 10.6% of the public space in the building. The majority of new offices in the building report to the same vice president and are student focused and service oriented, with similar missions to that of the library resulting in a very harmonious cohabitation. Additional units with these missions and reporting structure are located in the new campus center, creating a synergy between the two buildings.

  10. 76 FR 71442 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    ... DEPARTMENT OF VETERANS AFFAIRS Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development of a Skilled and Intermediate Nursing Home Care Facility in Mather... construct, renovate, operate, and maintain a permanent long-term care facility (skilled nursing home and...

  11. 45 CFR 605.22 - Existing facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE... accessible to qualified handicapped persons. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by qualified handicapped persons...

  12. Site specific risk assessment of an energy-from-waste/thermal treatment facility in Durham Region, Ontario, Canada. Part B: Ecological risk assessment.

    PubMed

    Ollson, Christopher A; Whitfield Aslund, Melissa L; Knopper, Loren D; Dan, Tereza

    2014-01-01

    The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste (EFW) thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. In this paper we present the results of a comprehensive ecological risk assessment (ERA) for this planned facility, based on baseline sampling and site specific modeling to predict facility-related emissions, which was subsequently accepted by regulatory authorities. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and the maximum design capacity (400,000 tonnes per year). In general, calculated ecological hazard quotients (EHQs) and screening ratios (SRs) for receptors did not exceed the benchmark value (1.0). The only exceedances noted were generally due to existing baseline media concentrations, which did not differ from those expected for similar unimpacted sites in Ontario. This suggests that these exceedances reflect conservative assumptions applied in the risk assessment rather than actual potential risk. However, under predicted upset conditions at 400,000 tonnes per year (i.e., facility start-up, shutdown, and loss of air pollution control), a potential unacceptable risk was estimated for freshwater receptors with respect to benzo(g,h,i)perylene (SR=1.1), which could not be attributed to baseline conditions. Although this slight exceedance reflects a conservative worst-case scenario (upset conditions coinciding with worst-case meteorological conditions), further investigation of potential ecological risk should be performed if this facility is expanded to the maximum operating capacity in the future. © 2013.

  13. CENTRALIZED TREATMENT OF METAL FINISHING WASTES AT A CLEVELAND RESOURCE RECOVERY PARK: PART 1. DESIGN AND COSTS. PART 2. FINANCING. PART 3. SITE INVESTIGATION

    EPA Science Inventory

    The report, in three parts, describes the characteristics of the Cleveland (OH) area electroplating industry and an approach and design for a centralized facility to treat cyanide and heavy metal wastes generated by this industry. The facility is termed the Resource Recovery Park...

  14. 14 CFR 21.43 - Location of manufacturing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Location of manufacturing facilities. 21.43... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Type Certificates § 21.43 Location of manufacturing facilities... location of the manufacturer's facilities places no undue burden on the FAA in administering applicable...

  15. Direct facility funding as a response to user fee reduction: implementation and perceived impact among Kenyan health centres and dispensaries

    PubMed Central

    Opwora, Antony; Kabare, Margaret; Molyneux, Sassy; Goodman, Catherine

    2010-01-01

    There is increasing pressure for reduction of user fees, but this can have adverse effects by decreasing facility-level funds. To address this, direct facility funding (DFF) was piloted in Coast Province, Kenya, with health facility committees (HFCs) responsible for managing the funds. We evaluated the implementation and perceived impact 2.5 years after DFF introduction. Quantitative data collection at 30 public health centres and dispensaries included a structured interview with the in-charge, record reviews and exit interviews. In addition, in-depth interviews were conducted with the in-charge and HFC members at 12 facilities, and with district staff and other stakeholders. DFF procedures were well established: HFCs met regularly and accounting procedures were broadly followed. DFF made an important contribution to facility cash income, accounting for 47% in health centres and 62% in dispensaries. The main items of expenditure were wages for support staff (32%), travel (21%), and construction and maintenance (18%). DFF was perceived to have a highly positive impact through funding support staff such as cleaners and patient attendants, outreach activities, renovations, patient referrals and increasing HFC activity. This was perceived to have improved health worker motivation, utilization and quality of care. A number of problems were identified. HFC training was reportedly inadequate, and no DFF documentation was available at facility level, leading to confusion. Charging user fees above those specified in the national policy remained common, and understanding of DFF among the broader community was very limited. Finally, relationships between HFCs and health workers were sometimes characterized by mistrust and resentment. Relatively small increases in funding may significantly affect facility performance when the funds are managed at the periphery. Kenya plans to scale up DFF nationwide. Our findings indicate this is warranted, but should include improved training

  16. Direct facility funding as a response to user fee reduction: implementation and perceived impact among Kenyan health centres and dispensaries.

    PubMed

    Opwora, Antony; Kabare, Margaret; Molyneux, Sassy; Goodman, Catherine

    2010-09-01

    There is increasing pressure for reduction of user fees, but this can have adverse effects by decreasing facility-level funds. To address this, direct facility funding (DFF) was piloted in Coast Province, Kenya, with health facility committees (HFCs) responsible for managing the funds. We evaluated the implementation and perceived impact 2.5 years after DFF introduction. Quantitative data collection at 30 public health centres and dispensaries included a structured interview with the in-charge, record reviews and exit interviews. In addition, in-depth interviews were conducted with the in-charge and HFC members at 12 facilities, and with district staff and other stakeholders. DFF procedures were well established: HFCs met regularly and accounting procedures were broadly followed. DFF made an important contribution to facility cash income, accounting for 47% in health centres and 62% in dispensaries. The main items of expenditure were wages for support staff (32%), travel (21%), and construction and maintenance (18%). DFF was perceived to have a highly positive impact through funding support staff such as cleaners and patient attendants, outreach activities, renovations, patient referrals and increasing HFC activity. This was perceived to have improved health worker motivation, utilization and quality of care. A number of problems were identified. HFC training was reportedly inadequate, and no DFF documentation was available at facility level, leading to confusion. Charging user fees above those specified in the national policy remained common, and understanding of DFF among the broader community was very limited. Finally, relationships between HFCs and health workers were sometimes characterized by mistrust and resentment. Relatively small increases in funding may significantly affect facility performance when the funds are managed at the periphery. Kenya plans to scale up DFF nationwide. Our findings indicate this is warranted, but should include improved training

  17. The Facilities Audit. A Process for Improving Facilities Conditions.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    The problems of deferred maintenance and decaying campus infrastructure have troubled higher education for the past two decades. This book, designed to be a tool for facilities managers, describes a process for inspecting and reporting conditions of buildings and infrastructure. The audit process is meant to be a routine part of maintenance…

  18. One with the Environment

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2005-01-01

    As energy costs rise and resources dwindle, schools and universities can benefit greatly by taking an environmentally sensitive approach to construction, renovation and maintenance of facilities. Administrators free up needed budget resources by operating facilities more efficiently. Using sustainable-design strategies can set a good example for…

  19. Change Is Good...Wrong!

    ERIC Educational Resources Information Center

    Hill, Franklin

    2000-01-01

    Change must be personally relevant, beneficial, clearly defined and believed to be achievable. To renovate school facilities, several steps are necessary: identifying future trends and making them personally applicable, establishing a realistic vision, creating functional facility goals, seeing the building as an empty shell, and considering…

  20. Renovated, repurposed, and still “one sweet library”: a case study on loss of space from the Health Sciences and Human Services Library, University of Maryland, Baltimore

    PubMed Central

    Tooey, Mary Joan (M.J.)

    2010-01-01

    Setting: The Health Sciences and Human Services Library (HS/HSL), University of Maryland, Baltimore (UMB), is located in an urban environment on the west side of downtown Baltimore. Founded in 1813, the library opened its current building in 1998 and is one of the largest health sciences libraries in the United States, with 6 floors and over 180,000 gross square and 118,000 net assignable square feet (NASF). Project: The initial discussions in late 2005 involved moving campus offices into the library. Almost immediately, it was recognized that a much larger renovation was needed due to the scope of the work. The vice president for academic affairs, the library executive director, and campus planners agreed that if the renovation was done thoughtfully, multiple needs could be met, including new office spaces, better user spaces, and synergy with the new campus center being built next door. Planning: The planning, design, and construction process was multifaceted and on a fast track. Although the final piece of the renovation was completed in June 2009, the majority of the planning, design, and construction took place between March 2006 and June 2008. All tenants were involved with office design. Library staff were involved in designing the public spaces and planning the strategy for weeding and shifting. Outcomes: Approximately 8,000 NASF was reallocated to new office space from shelving space, amounting to approximately 6.7% of the building NASF and approximately 10.6% of the public space in the building. The majority of new offices in the building report to the same vice president and are student focused and service oriented, with similar missions to that of the library resulting in a very harmonious cohabitation. Additional units with these missions and reporting structure are located in the new campus center, creating a synergy between the two buildings. PMID:20098653

  1. Renovated Korean nuclear safety and security system: A review and suggestions to successful settlement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chung, W. S.; Yun, S. W.; Lee, D. S.

    2012-07-01

    Questions of whether past nuclear regulatory body of Korea is not a proper system to monitor and check the country's nuclear energy policy and utilization have been raised. Moreover, a feeling of insecurity regarding nuclear safety after the nuclear accident in Japan has spread across the public. This has stimulated a renovation of the nuclear safety regime in Korea. The Nuclear Safety and Security Commission (NSSC) was launched on October 26, 2011 as a regulatory body directly under the President in charge of strengthening independence and nuclear safety. This was a meaningful event as the NSSC it is a muchmore » more independent regulatory system for Korea. However, the NSSC itself does not guarantee an enhanced public acceptance of the nuclear policy and stable use nuclear energy. This study introduces the new NSSC system and its details in terms of organization structure, appropriateness of specialty, budget stability, and management system. (authors)« less

  2. Site specific risk assessment of an energy-from-waste thermal treatment facility in Durham Region, Ontario, Canada. Part A: Human health risk assessment.

    PubMed

    Ollson, Christopher A; Knopper, Loren D; Whitfield Aslund, Melissa L; Jayasinghe, Ruwan

    2014-01-01

    The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. This paper presents the results of a comprehensive human health risk assessment for this facility. This assessment was based on extensive sampling of baseline environmental conditions (e.g., collection and analysis of air, soil, water, and biota samples) as well as detailed site specific modeling to predict facility-related emissions of 87 identified contaminants of potential concern. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and for the maximum design capacity (400,000 tonnes per year). For the 140,000 tonnes per year scenario, this assessment indicated that facility-related emissions are unlikely to cause adverse health risks to local residents, farmers, or other receptors (e.g., recreational users). For the 400,000 tonnes per year scenarios, slightly elevated risks were noted with respect to inhalation (hydrogen chloride) and infant consumption of breast milk (dioxins and furans), but only during predicted 'upset conditions' (i.e. facility start-up, shutdown, and loss of air pollution control) that represent unusual and/or transient occurrences. However, current provincial regulations require that additional environmental screening would be mandatory prior to expansion of the facility beyond the initial approved capacity (140,000 tonnes per year). Therefore, the potential risks due to upset conditions for the 400,000 tonnes per year scenario should be more closely investigated if future expansion is pursued. © 2013.

  3. Does PDC Belong in Facilities Management?

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  4. 45 CFR 1309.4 - Eligibility-Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...

  5. 45 CFR 1309.4 - Eligibility-Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...

  6. Improving the Physical and Social Environment of School: A Question of Equity

    ERIC Educational Resources Information Center

    Uline, Cynthia L.; Wolsey, Thomas DeVere; Tschannen-Moran, Megan; Lin, Chii-Dean

    2010-01-01

    This study explored the interplay between quality facilities and school climate, charting the effects of facility conditions on student and teacher attitudes, behaviors, and performance within schools slated for renovations in a large metropolitan school district. The research applied a school leadership-building design model to explore how six…

  7. Planning and Designing for Students with Disabilities.

    ERIC Educational Resources Information Center

    Abend, Allen C.

    This report presents the laws, regulations, and design requirements needed for educational facilities to meet the challenge of educating students with disabilities. A list of planning and design principles to be considered when building or renovating school facilities is offered that includes creating versatile classroom spaces, minimizing travel…

  8. Facility Needs and Costs in America's Great City Schools

    ERIC Educational Resources Information Center

    Casserly, Michael; Lachlan-Hache, Jonathon; Manish Naik

    2011-01-01

    The nation's major city public school districts have substantial construction, renovation, modernization, and deferred maintenance needs because of the age and size of their school buildings, shifting populations, and the need to devote substantial resources to instructional personnel to meet their core academic mission. For instance, the average…

  9. 33 CFR 143.120 - Floating OCS facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT OCS Facilities § 143.120 Floating OCS facilities... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and Equipment). Where unusual design or equipment needs make compliance impracticable, alternative proposals...

  10. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  11. Spare parts management for nuclear power generation facilities

    NASA Astrophysics Data System (ADS)

    Scala, Natalie Michele

    With deregulation, utilities in the power sector face a much more urgent imperative to emphasize cost efficiencies as compared to the days of regulation. One major opportunity for cost savings is through reductions in spare parts inventories. Most utilities are accustomed to carrying large volumes of expensive, relatively slow-moving parts because of a high degree of risk-averseness. This attitude towards risk is rooted in the days of regulation. Under regulation, companies recovered capital inventory costs by incorporating them into the base rate charged to their customers. In a deregulated environment, cost recovery is no longer guaranteed. Companies must therefore reexamine their risk profile and develop policies for spare parts inventory that are appropriate for a competitive business environment. This research studies the spare parts inventory management problem in the context of electric utilities, with a focus on nuclear power. It addresses three issues related to this problem: criticality, risk, and policy. With respect to criticality and risk, a methodology is presented that incorporates the use of influence diagrams and the Analytic Hierarchy Process (AHP). A new method is developed for group aggregation in the AHP when Saaty and Vargas' (2007) dispersion test fails and decision makers are unwilling or unable to revise their judgments. With respect to policy, a quantitative model that ranks the importance of keeping a part in inventory and recommends a corresponding stocking policy through the use of numerical simulation is developed. This methodology and its corresponding models will enable utilities that have transitioned from a regulated to a deregulated environment become more competitive in their operations while maintaining safety and reliability standards. Furthermore, the methodology developed is general enough so that other utility plants, especially those in the nuclear sector, will be able to use this approach. In addition to regulated

  12. 50 CFR 86.20 - What activities are eligible for funding?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... these tie-up facilities on navigable waters, available to the public. You must design new construction and renovations to last at least 20 years; (2) Design these tie-up facilities for temporary use for...) Carrying out site surveys and engaging in site planning; (v) Preparing cost estimates; and (vi) Preparing...

  13. Strategies for Passing School Bond Elections

    ERIC Educational Resources Information Center

    Adams, Christy Harris

    2017-01-01

    Inadequate, deteriorating, old school buildings and facilities are a major concern in many school districts across the country. Studies have determined that students perform better and learn more in newer, cleaner facilities. For school districts to be able to afford new constructions or renovations, school bonds are often necessary. There are…

  14. Long-Term Lessons

    ERIC Educational Resources Information Center

    Gettelman, Alan

    2006-01-01

    Public or private, K-12, college or university, no one knows their facilities better than school maintenance and operations staff--from the front-line custodians to facility managers. When it comes to planning restrooms for new construction and renovation, operational experience is especially critical. Applying best practices in advance can save…

  15. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  16. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  17. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  18. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  19. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  20. 77 FR 27797 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... 4279-2) for the following: Applicant/Location: Samoa Cold Storage, Inc. Principal Product/Purpose: The... demolition of the interior of the existing facility, renovations and improvements, repairs and upgrades and...

  1. 12 CFR 741.210 - Central liquidity facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Central liquidity facility. 741.210 Section 741... Unions That Also Apply to Federally Insured State-Chartered Credit Unions § 741.210 Central liquidity... Liquidity Facility, shall adhere to the requirements stated in part 725 of this chapter. ...

  2. Renovation of epithermal neutron beam for BNCT at THOR.

    PubMed

    Liu, Y-W H; Huang, T T; Jiang, S H; Liu, H M

    2004-11-01

    Heading for possible use for clinical trial, THOR (Tsing Hua Open-pool Reactor) at Taiwan was shutdown for renovation of a new epithermal neutron beam in January 2003. In November 2003, concrete cutting was finished for closer distance from core and larger treatment room. This article presents the design base that the construction of the new beam is based on. The filter/moderator design along the beam is Cd(0.1cm)+Al(10 cm)+FLUENTAL (16 cm)+Al(10 cm)+FLUENTAL(24 cm)+Void(18 cm)+Cd(0.1cm)+Bi(10 cm) with 6 cm Pb as reflector. Following the filter/moderator is an 88 cm long, 6 cm thick Bi-lined collimator with Li(2)CO(3)-PE at the end. The collimator is surrounded by Li(2)CO(3)-PE and Pb. The calculated beam parameters under 2 MW at the beam exit is phi(epi) = 3.4 x 10(9) n/cm(2)/s, Df/phi(epi) = 2.8 x 10(-11) cGy cm(2)/n, Dgamma/phi(epi) = 1.3 x 10(-11) cGy cm(2)/n, and J+/phi = 0.8. For a phantom placed 10 cm from beam exit, MCNP calculation shows that the advantage depth is 8.9 cm, and advantage ratio is 5.6 if boron concentration in tumor and normal tissue are assumed to be 65 and 18 ppm. The maximum dose rate for normal tissue is 50 cGy/min. The maximum therapeutic ratio is 6. The construction of the beam is scheduled to be finished by the end of April 2004.

  3. University of Kansas Medical center Cancer Research Equipment Award Type: Construction Grant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caldwell, Jamie

    A major mechanism to strengthen the overall cancer focus of KUCC and expand specific research programs is through targeted recruitment of additional cancer researchers to increase the national and international status of the Cancer Center, enhance the number of NCI/cancer-related grants, fill critical research needs, and enable new collaborative projects. Over the last five years KUCC has demonstrated the ability to recruit nationally recognized basic, translational and clinical scientists to fill key leadership positions and strengthen our research programs. These researchers require new and renovated research facilities require state-of-the-art laboratory equipment. This includes standard equipment for the renovated laboratories andmore » more specialized equipment as part of new investigator start-up packages. This funding is used to support recruitment, facilities, equipment, shared resources, administration, and patient care services. KUCC is committed to recruiting additional cancer researchers to increase the national and international status of the Cancer Center, enhance the number of NCI/cancer-related grants, fill critical research positions and build the four cancer research programs. Each purposeful hire aims to further the scientific vision, mission, and goals of the Cancer Center research programs. The funds requested will be used to supplement the recruitment packages of future cancer center recruits primarily through purchase of key equipment items.« less

  4. Planning library spaces to encourage collaboration

    PubMed Central

    Adamson, Martha C.; Bunnett, Brian P.

    2002-01-01

    Most librarians can give examples from their own experience in which a library's physical space was either ill suited to the work to be performed or, in some unfortunate cases, a genuine barrier to productivity. In an effort to correct or avoid these situations, planners of library renovations or new construction make pre-design studies of individual workers' tasks and workflow at the work-unit level. In this article, the authors discuss how a pre-design review of library and institutional values influenced the course of a library renovation. The identification of collaboration as the major theme of the library and the institution's strategic directions drove renovation decisions and resulted in a facility that supports and promotes this concept. PMID:12398250

  5. College Union Facilities and Their Perceived Influence on Institutional Retention

    ERIC Educational Resources Information Center

    Tierno, Scott A.

    2013-01-01

    The College Union is a campus facility that is part of the campus ecology. It provides a place where all can feel a sense of inclusion, safety, involvement, and community. Through a comparative research approach I will present how both students and professional staff perceive the College Union, the programs that are part of the facility, and how…

  6. Asbestos exposure during renovation and demolition of asbestos-cement clad buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, S.K.

    External asbestos cement (AC) claddings become weathered after many years by the gradual loss of cement from exposed surfaces; as a result, loosely bound layers enriched with asbestos fibers are formed. Asbestos fibers on such weathered surfaces may be mixtures of chrysotile with amosite or crocidolite. Renovation and demolition of old AC clad buildings could cause asbestos fiber emission, but this has not been investigated in the past. The exposure of workers to asbestos dust during these operations and precautions to minimize exposure now have been investigated at several building sites. Asbestos dust concentrations during water jet cleaning or paintingmore » of weathered AC roofing were approximately 0.1 to 0.2 fibers per milliliter (f/mL). Limited results suggest that concentrations may be reduced substantially by avoiding abrasion of surfaces. Concentrations during AC roof replacement averaged approximately 0.1 f/mL and were reduced markedly by employing more careful work procedures. Asbestos dust concentrations during demolition by removal of whole sheets averaged 0.3 to 0.6 f/mL for roofs and less than 0.1 f/mL for walls, reflecting the significant differences in extent of weathering between these elements. Suppression of asbestos emissions from roof sheets by wetting or sealing of weathered surfaces was not predictable because of the occurrence of asbestos fibers in dust trapped under sheet laps.« less

  7. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  8. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  9. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  10. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  11. A Paradigm Shift

    ERIC Educational Resources Information Center

    Woofter, Miles

    2008-01-01

    Planners and administrators at colleges and universities across the country face a daunting task: how to complete renovations or build new facilities in a tumultuous and challenging economic climate. It cannot be expected that wholesale improvement will come quickly, but the need to improve facilities is a pressing reality. Residence halls,…

  12. Fusion Building: New Trend with Some Old Roots

    ERIC Educational Resources Information Center

    Hamilton, Craig

    2009-01-01

    The focus on the quality of a student's entire academic experience has led to a greater emphasis on student life activities and facilities. In response, many campuses are renovating, expanding, or creating new buildings that support student life. While many of these are traditional stand-alone student dormitories, dining facilities, unions, and…

  13. 38 CFR 59.110 - Recapture provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., acquire or renovate a State home facility principally for furnishing domiciliary care, nursing home care...) GRANTS TO STATES FOR CONSTRUCTION OR ACQUISITION OF STATE HOMES § 59.110 Recapture provisions. If a facility for which a grant has been awarded ceases to be operated as a State home for the purpose for which...

  14. Planning for Accessibility.

    ERIC Educational Resources Information Center

    Spoor, Dana L.

    1997-01-01

    Argues that barrier-free designs should be incorporated in the first steps of school facility planning to avoid the difficulties in meeting Americans with Disabilities Act (ADA) guidelines during renovations. Explains why not all barriers need be removed to make a facility accessible to everyone. Discusses issues involving ADA guidelines and child…

  15. 10 CFR 1016.9 - Processing security facility approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Processing security facility approval. 1016.9 Section 1016... § 1016.9 Processing security facility approval. The following receipt of an acceptable request for... granted pursuant to § 1016.6 of this part. ...

  16. 10 CFR 1016.9 - Processing security facility approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Processing security facility approval. 1016.9 Section 1016... § 1016.9 Processing security facility approval. The following receipt of an acceptable request for... granted pursuant to § 1016.6 of this part. ...

  17. 40 CFR 745.326 - Renovation: State and Tribal program requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... distribution of lead hazard information to owners and occupants of target housing and child-occupied facilities... diverse audience of housing and child-occupied facility owners and occupants in that State or Tribe. (i) A...

  18. 49 CFR 37.43 - Alteration of transportation facilities by public entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Alteration of transportation facilities by public... transportation facilities by public entities. (a)(1) When a public entity alters an existing facility or a part of an existing facility used in providing designated public transportation services in a way that...

  19. 10 CFR 770.1 - What is the purpose of this part?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC DEVELOPMENT § 770.1 What is the purpose of this part? (a) This part establishes how DOE will transfer by sale or lease real property at defense nuclear facilities for economic development. (b) This part also...

  20. CANISTER HANDLING FACILITY DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.F. Beesley

    The purpose of this facility description document (FDD) is to establish requirements and associated bases that drive the design of the Canister Handling Facility (CHF), which will allow the design effort to proceed to license application. This FDD will be revised at strategic points as the design matures. This FDD identifies the requirements and describes the facility design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This FDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This FDD is part of an iterative designmore » process. It leads the design process with regard to the flowdown of upper tier requirements onto the facility. Knowledge of these requirements is essential in performing the design process. The FDD follows the design with regard to the description of the facility. The description provided in this FDD reflects the current results of the design process.« less

  1. The ICCB Computer Based Facilities Inventory & Utilization Management Information Subsystem.

    ERIC Educational Resources Information Center

    Lach, Ivan J.

    The Illinois Community College Board (ICCB) Facilities Inventory and Utilization subsystem, a part of the ICCB management information system, was designed to provide decision makers with needed information to better manage the facility resources of Illinois community colleges. This subsystem, dependent upon facilities inventory data and course…

  2. Catalog of Uncommon Facilities in Western Colleges and Universities.

    ERIC Educational Resources Information Center

    Viehland, Dennis, Comp.

    A list of rare, and often unique, facilities in the western part of the United States is presented that is designed to serve as a resource for researchers. The list of facilities is a guide to what uncommon equipment, centers or institutes, and collections are available at western higher education facilities and what provisions exist for sharing…

  3. Facilities Audit Workbook: A Self-Evaluation for Higher Education.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    The purpose and scope of a facilities audit and steps in conducting an audit are outlined, and facility ratings forms that can be used in the process are included. The audit is presented as a part of the comprehensive facilities management approach, and the users and different audit uses are also addressed. The audit design phase includes deciding…

  4. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... into a wellhead protection area as defined by the Safe Drinking Water Act of 1986 (SDWA). 1 The...) Water intakes (drinking, cooling, or other); (2) Schools; (3) Medical facilities; (4) Residential areas... discharge; (2) Proximity to downgradient wells, waterways, and drinking water intakes; (3) Proximity to fish...

  5. RCRA, superfund and EPCRA hotline training module. Introduction to: RCRA treatment, storage, and disposal facilities (40 cfr parts 264/265, subparts a-e) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The management of hazardous waste at treatment, storage, and disposal facilities (TSDFs) plays a large and critical role in the Resource Conservation and Recovery Act (RCRA) regulatory scheme. The training module presents an overview of the general TSDF standards found in 40 CFR Parts 264/265, Subparts A through E.

  6. Modernizing an ambulatory care pharmacy in a large multi-clinic institution.

    PubMed

    Miller, R F; Herrick, J D

    1979-03-01

    The steps involved in modernizing an outdated outpatient pharmacy, including the functional planning process, development of a work-flow pattern which makes the patient an integral part of the system, budget considerations and evaluation of the new pharmacy, are described. Objectives of the modernization were to: (1) provide a facility conductive to efficient and high quality services to the ambulatory patient; (2) provide an attractive and comfortable area for patients and staff; (3) provide a work flow which keeps the patient in the system and allows the pharmacist time for instruction and patient education; and (4) establish a patient medication record system. After one year of operation, average overall prescription volume increased by 50%, while average waiting time declined by 74%. Facility and procedural changes allowed the pharmacist to substantially increase patient counseling activity. The application of functional planning and facility design to the renovation and restructuring of an outpatient pharmacy allowed pharmacists to provide efficient, patient-oriented service.

  7. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Wendy Lawrence manipulates part of a Multi-Purpose Logistics Module. Lawrence is a new addition to the mission crew. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

    NASA Image and Video Library

    2003-10-30

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Wendy Lawrence manipulates part of a Multi-Purpose Logistics Module. Lawrence is a new addition to the mission crew. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

  8. 40 CFR 745.326 - Renovation: State and Tribal program requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES... distribution of lead hazard information to owners and occupants of target housing and child-occupied facilities... distributing the lead hazard information to owners and occupants of housing and child-occupied facilities prior...

  9. Correspondence about the Applicability of Asbestos NESHAP to Residential Demolition Projects

    EPA Pesticide Factsheets

    These correspondence about the asbestos NESHAP provide clarification on some demolition concerns such as the definition of a facility, the definition of site, and ownership applicability for renovations conducted on buildings after resale.

  10. 40 CFR 745.80 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Act (15 U.S.C. 2682 and 2686) and applies to all renovations performed for compensation in target... and occupants of target housing and child-occupied facilities receive information on lead-based paint...

  11. 40 CFR 745.80 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Act (15 U.S.C. 2682 and 2686) and applies to all renovations performed for compensation in target... and occupants of target housing and child-occupied facilities receive information on lead-based paint...

  12. Budget-Minded Renovation Lights Up Students' Learning.

    ERIC Educational Resources Information Center

    McDaniel, Craig

    1998-01-01

    Provides considerations for educational facility lighting designs that support student learning while controlling costs. Lighting design decision factors include the types of classroom activities involved, the importance of properly using artificial and indirect lighting, the importance of color rendering, the positioning of windows and skylights,…

  13. Arizona Takes on School Construction and Renovation

    ERIC Educational Resources Information Center

    Geiger, Philip E.

    2001-01-01

    Spurred by a state superior court deadline for developing a constitutional school capital finance system, Arizona Governor Jane Hull signed legislation (Students FIRST) that dramatically reformed school construction. This legislation created a School Facilities Board and established three funds for improving school conditions and meeting building…

  14. Considerations When Upgrading and Renovating Window Systems

    ERIC Educational Resources Information Center

    Gille, Steve

    2010-01-01

    Today's educational facilities managers face many challenges. As stewards of their campus' physical assets, these professionals are charged with improving students' learning environments, saving money, and maintaining the historical and aesthetic integrity of their buildings. For schools and universities that have not replaced their windows in…

  15. Multi-Axis Test Facility

    NASA Image and Video Library

    1959-11-01

    Multi-Axis Test Facility, Space Progress Report, November 1, 1959: The Multi Axis Space Test Inertia Facility [MASTIF], informally referred to as the Gimbal Rig, was installed inside the Altitude Wind Tunnel. The rig, which spun on three axis simultaneously, was used to train the Mercury astronauts on how to bring a spinning spacecraft under control and to determine the effects of rapid spinning on the astronaut's eyesight and psyche. Small gaseous nitrogen jets were operated by the pilot to gain control of the rig after it had been set in motion. Part 1 shows pilot Joe Algranti in the rig as it rotates over one, two, and three axis. It also has overall views of the test set-up with researchers and technicians on the test platform. Part 2 shows Algranti being secured in the rig prior to the test. The rig is set in motion and the pilot slowly brings it under control. The Mercury astronauts trained on the MASTIF in early spring of 1960.

  16. Radar Training Facility initial validation.

    DOT National Transportation Integrated Search

    1983-05-01

    The Radar Training Facility (RTF), part of the Federal Aviation Administration Academy located at the Oklahoma City Mike Monroney Aeronautical Center, is designed to identify, as early as possible, air traffic control specialists who do not demonstra...

  17. D.C. Public School and Public Charter School Capital Budgeting: Task 3 Report

    ERIC Educational Resources Information Center

    Filardo, Mary; Rivlin, Alice M.; O'Cleireacain, Carol; Garrison, David

    2005-01-01

    The District of Columbia is four years into the implementation of a ten year Educational Facility Master Plan and seven years into the development of Public Charter Schools. A great deal of work to improve public school facilities has been done. The new buildings and renovations that have been completed by the District of Columbia Public Schools…

  18. Blueprint for Safety

    ERIC Educational Resources Information Center

    Roy, Ken

    2010-01-01

    If your lab facilities are going to be replaced or renovated, you should insist that the science instructors be involved in the process from planning to construction. You know what you'll need in a facility, and your input should be sought out by administrators and architects alike. Once construction is complete, changes can be very costly, so…

  19. Lasting Value

    ERIC Educational Resources Information Center

    Jolicoeur, Mark; Kahl, Melanie

    2010-01-01

    More than 10 years ago, the U.S. Department of Education estimated that the average age of American school facilities was 40 years. With the slowing education construction market, one can assume that this age is continuing to rise. And this system of aging school facilities begs the question: Renovate or replace? When schools are looking at their…

  20. Programs for Infants and Young Children. Part IV: Facilities and Equipment.

    ERIC Educational Resources Information Center

    Sale, June

    This manual is designed to facilitate planning for day care center facilities. Goals and principles of day care are discussed in relation to programs for infants, toddlers, and preschoolers with special attention to staff, parents, and community. Suggestions are presented for indoor and outdoor planning for such topics as equipment, supplies,…

  1. Survey of aircraft icing simulation test facilities in North America

    NASA Technical Reports Server (NTRS)

    Olsen, W.

    1981-01-01

    A survey was made of the aircraft icing simulation facilities in North America: there are 12 wind tunnels, 28 engine test facilities, 6 aircraft tankers and 14 low velocity facilities, that perform aircraft icing tests full or part time. The location and size of the facility, its speed and temperature range, icing cloud parameters, and the technical person to contact are surveyed. Results are presented in tabular form. The capabilities of each facility were estimated by its technical contact person. The adequacy of these facilities for various types of icing tests is discussed.

  2. TDRS-L NASA Social Tour

    NASA Image and Video Library

    2014-01-23

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, social media participants were given an opportunity to go inside the spaceport's Vehicle Assembly Building. After serving through the Apollo and Space Shuttle Programs, the structure now is undergoing renovations to accommodate future launch vehicles and to continue as a major part of America's efforts to explore space. The social media participants gathered at the Florida spaceport for the launch of the Tracking and Data Relay Satellite, or TDRS-L spacecraft. Their visit included tours of key facilities and participating in presentations by key NASA leaders who updated the space agency's current efforts. Photo credit: NASA/Dan Casper

  3. 27 CFR 19.79 - Discontinuance of storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Discontinuance of storage... Provisions Activities Not Subject to This Part § 19.79 Discontinuance of storage facilities. When the appropriate TTB officer finds that any facilities for the storage of spirits on bonded premises are unsafe or...

  4. 36 CFR Appendix A to Part 1191 - Table Of Contents

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protruding Objects 205 Operable Parts 206 Accessible Routes 207 Accessible Means of Egress 208 Parking Spaces..., Kitchenettes, and Sinks 213 Toilet Facilities and Bathing Facilities 214 Washing Machines and Clothes Dryers... F205 Operable Parts F206 Accessible Routes F207 Accessible Means of Egress F208 Parking Spaces F209...

  5. Project for the development of the linac based NCT facility in University of Tsukuba.

    PubMed

    Kumada, H; Matsumura, A; Sakurai, H; Sakae, T; Yoshioka, M; Kobayashi, H; Matsumoto, H; Kiyanagi, Y; Shibata, T; Nakashima, H

    2014-06-01

    A project team headed by University of Tsukuba launched the development of a new accelerator based BNCT facility. In the project, we have adopted Radio-Frequency Quadrupole (RFQ)+Drift Tube Linac (DTL) type linac as proton accelerators. Proton energy generated from the linac was set to 8MeV and average current was 10mA. The linac tube has been constructed by Mitsubishi Heavy Industry Co. For neutron generator device, beryllium is selected as neutron target material; high intensity neutrons are generated by the reaction with beryllium and the 80kW proton beam. Our team chose beryllium as the neutron target material. At present beryllium target system is being designed with Monte-Carlo estimations and heat analysis with ANSYS. The neutron generator consists of moderator, collimator and shielding. It is being designed together with the beryllium target system. We also acquired a building in Tokai village; the building has been renovated for use as BNCT treatment facility. It is noteworthy that the linac tube had been installed in the facility in September 2012. In BNCT procedure, several medical devices are required for BNCT treatment such as treatment planning system, patient positioning device and radiation monitors. Thus these are being developed together with the linac based neutron source. For treatment planning system, we are now developing a new multi-modal Monte-Carlo treatment planning system based on JCDS. The system allows us to perform dose estimation for BNCT as well as particle radiotherapy and X-ray therapy. And the patient positioning device can navigate a patient to irradiation position quickly and properly. Furthermore the device is able to monitor movement of the patient׳s position during irradiation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Hurricane risk mitigation - High Pressure Gas Facility

    NASA Image and Video Library

    2008-07-29

    A worker pours concrete as part of a nitrogen risk mitigation project at the High Pressure Gas Facility at Stennis Space Center. The concrete slab will provide the foundation needed to place new pumps at the site and is part of ongoing hurricane-related mitigation work at Stennis.

  7. Hurricane risk mitigation - High Pressure Gas Facility

    NASA Technical Reports Server (NTRS)

    2008-01-01

    A worker pours concrete as part of a nitrogen risk mitigation project at the High Pressure Gas Facility at Stennis Space Center. The concrete slab will provide the foundation needed to place new pumps at the site and is part of ongoing hurricane-related mitigation work at Stennis.

  8. The Acoustic Environment of the NASA Glenn 9- by 15-foot Low-Speed Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Stephens, David B.

    2015-01-01

    The 9- by 15-Foot Low Speed Wind Tunnel is an acoustic testing facility with a long history of aircraft propulsion noise research. Due to interest in renovating the facility to support future testing of advanced quiet engine designs, a study was conducted to document the background noise level in the facility and investigate the sources of contaminating noise. The anechoic quality of the facility was also investigated using an interrupted noise method. The present report discusses these aspects of the noise environment in this facility.

  9. 24 CFR 891.315 - Prohibited facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... advances under the Section 811 Program, as well as loans financed under subpart E of this part. Project facilities may not include infirmaries, nursing stations, spaces dedicated to the delivery of medical...

  10. 24 CFR 891.315 - Prohibited facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... advances under the Section 811 Program, as well as loans financed under subpart E of this part. Project facilities may not include infirmaries, nursing stations, spaces dedicated to the delivery of medical...

  11. 24 CFR 891.315 - Prohibited facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... advances under the Section 811 Program, as well as loans financed under subpart E of this part. Project facilities may not include infirmaries, nursing stations, spaces dedicated to the delivery of medical...

  12. 24 CFR 891.315 - Prohibited facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... advances under the Section 811 Program, as well as loans financed under subpart E of this part. Project facilities may not include infirmaries, nursing stations, spaces dedicated to the delivery of medical...

  13. 24 CFR 891.315 - Prohibited facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... advances under the Section 811 Program, as well as loans financed under subpart E of this part. Project facilities may not include infirmaries, nursing stations, spaces dedicated to the delivery of medical...

  14. Hydrogen Infrastructure Testing and Research Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2017-04-10

    Learn about the Hydrogen Infrastructure Testing and Research Facility (HITRF), where NREL researchers are working on vehicle and hydrogen infrastructure projects that aim to enable more rapid inclusion of fuel cell and hydrogen technologies in the market to meet consumer and national goals for emissions reduction, performance, and energy security. As part of NREL’s Energy Systems Integration Facility (ESIF), the HITRF is designed for collaboration with a wide range of hydrogen, fuel cell, and transportation stakeholders.

  15. Bond Insurance Can Help Lower the Cost of Financing Your Facilities.

    ERIC Educational Resources Information Center

    Sockwell, Oliver R.

    1993-01-01

    For many colleges, universities, and teaching hospitals, the need to expand, renovate, or replace aging structures and equipment is crucial. Institutions need not be large and well known to tap nationwide capital pools. By using municipal bond insurance when issuing tax-exempt bonds for financing, they improve their credit rating and increase…

  16. 29 CFR 1918.97 - First aid and lifesaving facilities. (See appendix V of this part).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false First aid and lifesaving facilities. (See appendix V of... LONGSHORING General Working Conditions. § 1918.97 First aid and lifesaving facilities. (See appendix V of this... injury, regardless of severity, to the employer. (b) First aid. A first aid kit shall be available at or...

  17. Breadboard wash water renovation system. [using ferric chloride and ion exchange resins to remove soap and dissolved salts

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A total wash water renovation system concept was developed for removing objectionable materials from spacecraft wash water in order to make the water reusable. The breadboard model system described provides for pretreatment with ferric chloride to remove soap by chemical precipitation, carbon adsorption to remove trace dissolved organics, and ion exchange for removal of dissolved salts. The entire system was put into continuous operation and carefully monitored to assess overall efficiency and equipment maintenance problems that could be expected in actual use. In addition, the capacity of the carbon adsorbers and the ion-exchange resin was calculated and taken into consideration in the final evaluation of the system adequacy. The product water produced was well within the Tentative Wash Water Standards with regard to total organic carbon, conductivity, urea content, sodium chloride content, color, odor, and clarity.

  18. Numerical Facilities: A Review of the Literature. Technical Report 1985-3.

    ERIC Educational Resources Information Center

    Tal, Joseph S.

    This review of the relevant literature in the area of numerical facility attempts to clarify the construct of numerical facility and provide guidance for items tapping this ability. The review is presented in five parts. The first section introduces two approaches that can be used to investigate numerical facility, including factor analysis.…

  19. Small Child Care Facilities in Residential Areas.

    ERIC Educational Resources Information Center

    Giegerich & Associates, Inc., Rockville, MD.

    One part of a three-part investigation prepared for the Montgomery County Planning Board in Silver Spring, Maryland, this study addresses planning and site planning issues arising from the location of child care facilities in residential settings. The study, which emphasizes homes and centers which care for 7 to 20 children, provides a detailed…

  20. 10 CFR 770.1 - What is the purpose of this part?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What is the purpose of this part? 770.1 Section 770.1 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC... or lease real property at defense nuclear facilities for economic development. (b) This part also...

  1. 36 CFR 1281.1 - What is the scope of this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.1 What is the scope of this part? (a) This part implements provisions of the Presidential Libraries Act, codified at 44 U.S.C. 2112(a) and (g... for new and existing Presidential libraries in order to ensure that such depositories preserve...

  2. 10 CFR 770.1 - What is the purpose of this part?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What is the purpose of this part? 770.1 Section 770.1 Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC... or lease real property at defense nuclear facilities for economic development. (b) This part also...

  3. 36 CFR 1281.1 - What is the scope of this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.1 What is the scope of this part? (a) This part implements provisions of the Presidential Libraries Act, codified at 44 U.S.C. 2112(a) and (g... for new and existing Presidential libraries in order to ensure that such depositories preserve...

  4. 36 CFR 1281.1 - What is the scope of this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.1 What is the scope of this part? (a) This part implements provisions of the Presidential Libraries Act, codified at 44 U.S.C. 2112(a) and (g... for new and existing Presidential libraries in order to ensure that such depositories preserve...

  5. 36 CFR 1281.1 - What is the scope of this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.1 What is the scope of this part? (a) This part implements provisions of the Presidential Libraries Act, codified at 44 U.S.C. 2112(a) and (g... for new and existing Presidential libraries in order to ensure that such depositories preserve...

  6. 10 CFR 770.1 - What is the purpose of this part?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy DEPARTMENT OF ENERGY TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC... or lease real property at defense nuclear facilities for economic development. (b) This part also... DOE activities at the defense nuclear facility. ...

  7. Laboratory Animal Housing--Parts I and II.

    ERIC Educational Resources Information Center

    Runkle, Robert S.

    1963-01-01

    In recent years, the use of laboratory animals for bio-medical research has shown marked increase. Economic and efficient housing is a necessity. This two part report established guidelines for design and selection of materials for conventional animal housing. Contents include--(1) production and breeding facilities, (2) quarantine facilities, (3)…

  8. National facilities study. Volume 5: Space research and development facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R

  9. Solving a mathematical model integrating unequal-area facilities layout and part scheduling in a cellular manufacturing system by a genetic algorithm.

    PubMed

    Ebrahimi, Ahmad; Kia, Reza; Komijan, Alireza Rashidi

    2016-01-01

    In this article, a novel integrated mixed-integer nonlinear programming model is presented for designing a cellular manufacturing system (CMS) considering machine layout and part scheduling problems simultaneously as interrelated decisions. The integrated CMS model is formulated to incorporate several design features including part due date, material handling time, operation sequence, processing time, an intra-cell layout of unequal-area facilities, and part scheduling. The objective function is to minimize makespan, tardiness penalties, and material handling costs of inter-cell and intra-cell movements. Two numerical examples are solved by the Lingo software to illustrate the results obtained by the incorporated features. In order to assess the effects and importance of integration of machine layout and part scheduling in designing a CMS, two approaches, sequentially and concurrent are investigated and the improvement resulted from a concurrent approach is revealed. Also, due to the NP-hardness of the integrated model, an efficient genetic algorithm is designed. As a consequence, computational results of this study indicate that the best solutions found by GA are better than the solutions found by B&B in much less time for both sequential and concurrent approaches. Moreover, the comparisons between the objective function values (OFVs) obtained by sequential and concurrent approaches demonstrate that the OFV improvement is averagely around 17 % by GA and 14 % by B&B.

  10. Building Blueprints: Making Music.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Depicts how Cornell University renovated its civil engineering and architecture building to include space for musical performances, teaching, and rehearsals. The article highlights the facility's contemporary design, which also compliments the form and massing of the original building. (GR)

  11. Remaking the Facilities Organization. APPA Thought Leaders Series 2016

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, 2016

    2016-01-01

    The 2016 Thought Leaders symposium, supported in part by long-time sponsor Jacobs, focused on "Remaking the Facilities Organization." The report makes the case for a customer-centric higher education facilities organization. Experts provide their insights on how a focus on the customer provides a framework for driving change. The…

  12. Medical real estate in an age of reform.

    PubMed

    Hammond, Laca Wong; Camp, Philip J

    2011-04-01

    The following are four ways healthcare organizations are fulfilling their medical real estate needs in an era of change: Real estate monetization. Renovation of existing facilities. A careful focus on containing materials costs. Joint ventures with real estate organizations.

  13. 1. CONTEXTUAL VIEW OF WASTE CALCINING FACILITY. CAMERA FACING NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF WASTE CALCINING FACILITY. CAMERA FACING NORTHEAST. ON RIGHT OF VIEW IS PART OF EARTH/GRAVEL SHIELDING FOR BIN SET. AERIAL STRUCTURE MOUNTED ON POLES IS PNEUMATIC TRANSFER SYSTEM FOR DELIVERY OF SAMPLES BEING SENT FROM NEW WASTE CALCINING FACILITY TO THE CPP REMOTE ANALYTICAL LABORATORY. INEEL PROOF NUMBER HD-17-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  14. 9 CFR 71.20 - Approval of livestock facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... manufacturer for fly control. (17) Sheep and goats: —This facility will handle breeding sheep or goats... sheep that are not also designated high-risk animals or to sheep or goats designated under 9 CFR part 79... maintained by the facility for a period of 2 years, or for a period of 5 years in the case of sheep or goats...

  15. 9 CFR 71.20 - Approval of livestock facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... manufacturer for fly control. (17) Sheep and goats: —This facility will handle breeding sheep or goats... sheep that are not also designated high-risk animals or to sheep or goats designated under 9 CFR part 79... maintained by the facility for a period of 2 years, or for a period of 5 years in the case of sheep or goats...

  16. 78 FR 23581 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... conditions; major renovations needed to make bldgs. ideal to occupy; lead/asbestos; contact GSA for more info... bldgs. 5,388; Admin.; vacant since 1998; sits on 0.747 acres; fair conditions; lead/asbestos present... on 2.63 acres; Admin. office; fair conditions; eligible for Nat'l Register Historic Places; asbestos...

  17. 75 FR 19555 - NARA Facility Locations and Hours

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... at 41 CFR part 101-20. The National Archives at Philadelphia on Market Street (in Philadelphia) and... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION 36 CFR Parts 1200, 1253, and 1280 [FDMS Docket NARA-10-0002] RIN 3095-AB66 NARA Facility Locations and Hours AGENCY: National Archives and Records...

  18. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  19. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  20. 14 CFR 1250.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Definitions. 1250.102 Section 1250.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NONDISCRIMINATION IN FEDERALLY-ASSISTED... provision of facilities includes the construction, expansion, renovation, remodeling, alteration or...

  1. 40 CFR 745.80 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property Renovation § 745.80... and occupants of target housing and child-occupied facilities receive information on lead-based paint...

  2. 40 CFR 745.80 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property Renovation § 745.80... and occupants of target housing and child-occupied facilities receive information on lead-based paint...

  3. 40 CFR 745.80 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property Renovation § 745.80... and occupants of target housing and child-occupied facilities receive information on lead-based paint...

  4. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  5. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  6. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  7. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  8. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  9. Unusual Rebuilding Method of Historic St Mary's Cathedral in the Capital of Western Australia

    NASA Astrophysics Data System (ADS)

    Wysokowski, Adam

    2016-06-01

    St Mary's Cathedral is the Archbishop church of the Archdiocese in Perth in Western Australia. The presented sacral building was built in neo-Gothic style during the years 1863-1865. Cathedral was officially dedicated and opened for the service on 29th January, 1865. In 1973 was proclaimed the Marian Sanctuary and now represents one of the largest religious facilities in Perth. In 2005, the city authorities, together with the Archdiocese took a collective decision on the necessity of a comprehensive renovation of this sacred object. The renovation was due to the technical condition and the lack of usability of the object. The author of the paper had the opportunity to experience these problems by visiting this place several times, first time in 1989 and next years. Thus, the renovation of the present Cathedral was in its assumption not only to perform maintenance of the building and its specific architectural elements but also to increase its functional features - usable for the faithful and tourists. Reconstruction of St Mary's Cathedral in Perth can be a good example increasing the wider functionality of such facilities while keeping their antique and historical qualities. In this paper the above-mentioned issues will be more widely developed by the author.

  10. 10 CFR Appendix L to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] L Appendix L to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix L to Part 50 [Reserved] ...

  11. 10 CFR Appendix P to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] P Appendix P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix P to Part 50 [Reserved] ...

  12. 10 CFR Appendix D to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] D Appendix D to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix D to Part 50 [Reserved] ...

  13. 10 CFR Appendix M to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] M Appendix M to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix M to Part 50 [Reserved] ...

  14. 10 CFR Appendix O to Part 50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] O Appendix O to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix O to Part 50 [Reserved] ...

  15. RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Treatment, storage, and disposal facilities (40 CFR parts 264/265, subparts A-E) updated as of July 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The module presents an overview of the general treatment, storage, and disposal facility (TSDF) standards found in 40 CFR parts 264/265, subparts A through E. It identifies and explains each exclusion from parts 264/265, and provides definitions of excluded units, such as wastewater treatment unit and elementary neutralization unit. It locates and describes the requirements for waste analysis and personnel training. It also describes the purpose of a contingency plan and lists the emergency notification procedures. It describes manifest procedures and responsibilities, and lists the unmanifested waste reporting requirements.

  16. KSC-06pd1204

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  17. Changing levels of quiet in an intensive care nursery.

    PubMed

    Philbin, M Kathleen; Gray, Lincoln

    2002-09-01

    To document low sound levels, the range and pattern of levels, and the relative effects of operational (staff and equipment generated) and facility (building generated) noise on the acoustic environment of a level III nursery. A quasi-experimental, prospective, longitudinal study of one bed space. Operational noise was reduced through staff behavior change while facility noise was reduced through renovation. Initial noise levels were typical of those in the literature and in recently measured nurseries. About 80% of sound levels were between 62 and 70 dBA. The lowest levels (L(min)) were 60 to 65 dBA. After staff behavior change, L(min) was about 56 dBA although the highest levels (L(max)) remained at 78 to 100 dBA. Levels following renovation were reduced to L(min)s of 47 to 51 dBA and L(max)s of 68 to 84 dBA, perceived as three or four times quieter than initially. Staff behavior as well as the acoustical characteristics of the facility determine the levels of noise and quiet in an intensive care nursery.

  18. Use of facility assessment data to improve reproductive health service delivery in the Democratic Republic of the Congo

    PubMed Central

    2009-01-01

    Background Prolonged exposure to war has severely impacted the provision of health services in the Democratic Republic of the Congo (DRC). Health infrastructure has been destroyed, health workers have fled and government support to health care services has been made difficult by ongoing conflict. Poor reproductive health (RH) indicators illustrate the effect that the prolonged crisis in DRC has had on the on the reproductive health (RH) of Congolese women. In 2007, with support from the RAISE Initiative, the International Rescue Committee (IRC) and CARE conducted baseline assessments of public hospitals to evaluate their capacities to meet the RH needs of the local populations and to determine availability, utilization and quality of RH services including emergency obstetric care (EmOC) and family planning (FP). Methods Data were collected from facility assessments at nine general referral hospitals in five provinces in the DRC during March, April and November 2007. Interviews, observation and clinical record review were used to assess the general infrastructure, EmOC and FP services provided, and the infection prevention environment in each of the facilities. Results None of the nine hospitals met the criteria for classification as an EmOC facility (either basic or comprehensive). Most facilities lacked any FP services. Shortage of trained staff, essential supplies and medicines and poor infection prevention practices were consistently documented. All facilities had poor systems for routine monitoring of RH services, especially with regard to EmOC. Conclusions Women's lives can be saved and their well-being improved with functioning RH services. As the DRC stabilizes, IRC and CARE in partnership with the local Ministry of Health and other service provision partners are improving RH services by: 1) providing necessary equipment and renovations to health facilities; 2) improving supply management systems; 3) providing comprehensive competency-based training for

  19. 1991 survey of recent health sciences library building projects.

    PubMed Central

    Ludwig, L T

    1992-01-01

    Twenty health sciences libraries reported building planning, expansion, or construction of new facilities in the association's second annual survey of recent building projects. Six projects are new, freestanding structures in which the library occupies all or a major portion of the space. Six other projects are part of new construction for separately administered units in which the library is a major tenant. The final eight projects involve additions to or renovations of existing space. Seven of these twenty libraries were still in projected, predesign, or design stages of awaiting funding approval; of those seven, five were not prepared to release the requested information. Six projects are reported here as illustrative of current building projects. Images PMID:1600420

  20. 36 CFR § 1281.1 - What is the scope of this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.1 What is the scope of this part? (a) This part implements provisions of the Presidential Libraries Act, codified at 44 U.S.C. 2112(a) and (g... for new and existing Presidential libraries in order to ensure that such depositories preserve...

  1. Composite analysis E-area vaults and saltstone disposal facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cook, J.R.

    1997-09-01

    This report documents the Composite Analysis (CA) performed on the two active Savannah River Site (SRS) low-level radioactive waste (LLW) disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults (EAV) Disposal Facility. The analysis calculated potential releases to the environment from all sources of residual radioactive material expected to remain in the General Separations Area (GSA). The GSA is the central part of SRS and contains all of the waste disposal facilities, chemical separations facilities and associated high-level waste storage facilities as well as numerous other sources of radioactive material. The analysis considered 114 potentialmore » sources of radioactive material containing 115 radionuclides. The results of the CA clearly indicate that continued disposal of low-level waste in the saltstone and EAV facilities, consistent with their respective radiological performance assessments, will have no adverse impact on future members of the public.« less

  2. Medical surveillance and programs on industrial hygiene at RCRA facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murphy, T.E.

    1994-12-31

    Some special areas where much progress in industrial hygiene and safety has been made in the past few years are; training, personal protective equipment, uniforms, personal monitoring, area monitoring, and medical surveillance. Before one can begin to construct programs for worker protection, some knowledge of potential exposures must be gained. The best place to start is the Waste Analysis Plan, and the list of wastes that a particular site is authorized to receive. Waste Codes are listed within a facility`s Part A and Part B permits. Actual facility receipt of wastes are well documented within Load Records and other documentation.more » A facility`s training program forms the heart of a health and safety program. Every TSD facility should have developed a matrix of job titles and required training. Every facility must also make a commitment to providing a wide range of personal protective equipment, including a wide array of disposables. Some facilities will benefit from the occasional use of the newer respirator quantitative fit-testing devices. All facilities are urged to rent or borrow this type of equipment periodically. Quantitative respirator fit-testers are capable of revealing important deficiencies in a respirator program. Providing uniforms is a newer means of protecting workers. The use of uniforms is an effective means for addressing the idea of carry-home-waste. The use of disposables including boots, must be integrated into a Uniform Program if the program is to be effective. In addition, employees must strictly understand that uniforms must not leave the facility at any time, including lunch time.« less

  3. Assessment of air velocity sensors for use in animal produciton facilities

    USDA-ARS?s Scientific Manuscript database

    Ventilation is an integral part of thermal environment control in animal production facilities. Accurately measuring the air velocity distribution within these facilities is cumbersome using the traverse method and a distributed velocity measurement system would reduce the time necessary to perform ...

  4. 78 FR 25760 - Proposed Information Collection; Urban Park and Recreation Recovery Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ...--renovate or redesign existing close-to- home recreation facilities. Innovation--specific activities that... existing programs. Planning--development of a Recovery Action Program plan. The information collection... recreation system goals. Citizen involvement in the development of the Action Plan is required and may...

  5. Fashion Your New Library from Old.

    ERIC Educational Resources Information Center

    Burgin, William R.

    1997-01-01

    Renovation, addition, and adaptive reuse of existing facilities offer many advantages over new construction: savings, preservation of historical or architecturally significant buildings, preservation of traditional location, and faster relocation to a more desirable location. Discusses building criteria: structure, hazardous materials, siting,…

  6. The Future School: Designing for Student Success.

    ERIC Educational Resources Information Center

    Ruck, Gary

    1993-01-01

    Three themes of change in school planning are the future school, outsourcing, and the reconstruction of existing facilities to accommodate technological and philosophical potential. Describes the technology and the house concept at a middle school and renovations at an elementary school. (MLF)

  7. Building a Better Campus: An Update on Building Codes.

    ERIC Educational Resources Information Center

    Madden, Michael J.

    2002-01-01

    Discusses the implications for higher education institutions in terms of facility planning, design, construction, and renovation of the move from regionally-developed model-building codes to two international sets of codes. Also addresses the new performance-based design option within the codes. (EV)

  8. Principles Governing the Mechanics and Control of Snake Strikes

    DTIC Science & Technology

    2015-06-26

    Zoo Atlanta. In this exploratory project we will monitor kinematics, ground reaction forces and strike forces in snakes to gain insight into common...species once Zoo Atlanta is again open for research collaboration; their renovation and expansion of herpetological facility has limited our

  9. Waste Isolation Pilot Plant (WIPP) conceptual design report. Part I: executive summary. Part II: facilities and system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-06-01

    The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems. (DLC)

  10. Do physical environmental changes make a difference? Supporting person-centered care at mealtimes in nursing homes.

    PubMed

    Chaudhury, Habib; Hung, Lillian; Rust, Tiana; Wu, Sarah

    2017-10-01

    Purpose Drawing on therapeutic physical environmental design principles and Kitwood's theoretical view of person-centered care, this study examined the impact of environmental renovations in dining spaces of a long-term care facility on residents' mealtime experience and staff practice in two care units. Method The research design involved pre- and post-renovation ethnographic observations in the dining spaces of the care units and a post-renovation staff survey. The objective physical environmental features pre- and post-renovations were assessed with a newly developed tool titled Dining Environment Audit Protocol. We collected observational data from 10 residents and survey responses from 17 care aides and nurses. Findings Based on a systematic analysis of observational data and staff survey responses, five themes were identified: (a) autonomy and personal control, (b) comfort of homelike environment, (c) conducive to social interaction, (d) increased personal support, and (e) effective teamwork. Implications Although the physical environment can play an influential role in enhancing the dining experience of residents, the variability in staff practices reveals the complexity of mealtime environment and points to the necessity of a systemic approach to foster meaningful culture change.

  11. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  12. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  13. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  14. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  15. 40 CFR Appendix X to Part 266 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false [Reserved] X Appendix X to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... FACILITIES Appendix X to Part 266 [Reserved] ...

  16. 34 CFR 222.19 - What other statutes and regulations apply to this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the basis of sex), and the implementing regulations (34 CFR part 106). (Authority: 20 U.S.C. 1681-1683... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities... children with disabilities), 8007 (construction), and 8008 (school facilities). (4) 34 CFR part 82 (New...

  17. CHALLENGES IN SETTING UP QUALITY CONTROL IN DIAGNOSTIC RADIOLOGY FACILITIES IN NIGERIA.

    PubMed

    Inyang, S O; Egbe, N O; Ekpo, E

    2015-01-01

    The Nigerian Nuclear Regulatory Authority (NNRA) was established to regulate and control the use of radioactive and radiation emitting sources in Nigeria. Quality control (QC) on diagnostic radiology equipment form part of the fundamental requirements for the authorization of diagnostic radiology facilities in the Country. Some quality control tests (output, exposure linearity and reproducibility) were measured on the x-ray machines in the facilities that took part in the study. Questionnaire was developed to evaluate the frequencies at which QC tests were conducted in the facilities and the challenges in setting up QC. Results show great variation in the values of the QC parameters measured. Inadequate cooperation by facilities management, lack of QC equipment and insufficient staff form the major challenges in setting up QC in the facilities under study. The responses on the frequencies at which QC tests should be conducted did not correspond to the recommended standards; indicating that personnel were not familiar with QC implementation and may require further training on QC.

  18. USSR and Eastern Europe Scientific Abstracts Engineering and Equipment No. 30

    DTIC Science & Technology

    1977-03-18

    Table 2j Biblio 4. 41 HUNGARY INVESTIGATION OF TRANSIENT PHENOMENA IN FLUID PIPELINES WITH THE AID OF THE MATRIX OPERATOR Budapest ENERGIA ES...investigated. Ill 5; Biblio 3. 48 USSR UDC 629.7.036.002.2 PROCEDURE AND SETUP FOR RENOVATING WORN-OUT PARTS OF AVIATION GAS-TURBINE ENGINES...Kiev VOPROSY POVYSHENIYA NADEZHNOSTI, DOLGOVECHNOSTI I VOSSTANOVLENIYA AVIATSIONNOY TEKHNIKI [Increasing the Reliability, Lifetime and Renovation of

  19. Site maps and facilities listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less

  20. The association between high recreational physical activity and physical activity as a part of daily living in adolescents and availability of local indoor sports facilities and sports clubs.

    PubMed

    Niclasen, Birgit; Petzold, Max; Schnohr, Christina W

    2012-11-01

    The aim of this study was to examine how vigorous physical activity (recreational physical activity) (VPA) and moderate to vigorous physical activity as a part of daily life (MVPA) is associated with structural characteristics (availability of sports facilities and sports clubs with child members) in Greenlandic adolescents. Data from the 2006 Health Behaviour in School-aged Children survey including 2,430 children aged 11-17 years was used. Logistic regression models were developed with dichotomous measures on VPA and MVPA as outcomes, number of indoor sports facilities and of sports clubs with child members as independent variables, and adjusted for age, gender, family affluence (FAS), and type of habitation (capital, town or village). High VPA increased with access to indoor facilities, while high MVPA was less likely (odds ratio (OR) 0.54 (0.42-0.70)) if indoor sports facilities were present, both unadjusted and adjusted. Access to a local sports club increased OR for high VPA both unadjusted and adjusted to about 2.3 for five or more clubs, while access to sports clubs was not associated with unadjusted MVPA, negatively associated if adjusted for age, gender and FAS but positively associated if also adjusted for indoor sports facilities. Access to indoor sports facilities itself had a positive association with high VPA, but was persistently negatively associated with high MVPA. Presence of sports clubs with child members was positively associated with high VPA while the association with high MVPA was more complex. The findings have implications for public health planning.