Sample records for facility response plans

  1. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  2. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  3. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  4. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  5. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  6. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  7. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  8. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  9. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  10. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  11. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  12. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  13. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  14. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  15. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I cover more than one facility in my... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.3 May I cover more than one facility in my response plan? (a) Your response plan may be for a...

  16. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...

  17. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...

  18. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Spill response plans for facilities located in...

  19. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Spill response plans for facilities located in...

  20. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Spill response plans for facilities located in...

  1. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Spill response plans for facilities located in...

  2. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Spill response plans for facilities located in...

  3. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  4. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  5. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  6. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  7. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  8. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  9. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  10. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  11. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  12. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  13. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  14. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  15. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  16. 76 FR 9276 - Tank Vessel and Marine Transportation-Related Facility Response Plans for Hazardous Substances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...

  17. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise... name(s) or capabilities of the oil spill removal organizations cited in the plan; or (4) There is a...

  18. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  19. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  20. 78 FR 67027 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...-1070] RIN 1625-AB27 Nontank Vessel Response Plans and Other Response Plan Requirements AGENCY: Coast... Guard amended regulations on response plans for nontank vessels. The amendment triggered information... facility response plans. This notice announces that the collection of information has been approved by the...

  1. 30 CFR 254.20 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.20 Purpose. This subpart describes the requirements for preparing spill-response plans for...

  2. 40 CFR 265.55 - Emergency coordinator.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.55 Emergency coordinator. At all times, there must... aspects of the facility's contingency plan, all operations and activities at the facility, the location... out the contingency plan. [Comment: The emergency coordinator's responsibilities are more fully...

  3. Design Criteria: School Food Service Facilities.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee.

    This guide is intended for architects, district superintendents, and food service directors whose responsibility it is to plan food service facilities. It first discusses the factors to be considered in food service planning, presents cost studies, and lists the responsibilities of those involved in the planning. Other sections concern selection,…

  4. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... licensee offsite emergency response plan only to the extent necessary to compensate for the... response plan. ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management...

  5. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... licensee offsite emergency response plan only to the extent necessary to compensate for the... response plan. ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management...

  6. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... licensee offsite emergency response plan only to the extent necessary to compensate for the... response plan. ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management...

  7. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan”section is the core of the response plan. Put information in easy-to-use...

  8. A terrorism response plan for hospital security and safety officers.

    PubMed

    White, Donald E

    2002-01-01

    Security and Safety managers in today's healthcare facilities need to factor terrorism response into their emergency management plans, separate from the customary disaster plans and the comparatively recent security plans. Terrorism incidents will likely be security occurrences that use a weapon of mass destruction to magnify the incidents into disasters. Facility Y2K Plans can provide an excellent framework for the detailed contingency planning needed for terrorism response by healthcare facilities. Tabbed binder notebooks, with bulleted procedures and contact points for each functional section, can provide security and safety officers with at-a-glance instructions for quick 24/7 implementation. Each functional section should focus upon what activities or severity levels trigger activation of the backup processes. Network with your countywide, regional, and/or state organizations to learn what your peers are doing. Comprehensively inventory your state, local, and commercial resources so that you have alternate providers readily available 24/7 to assist your facility upon disasters.

  9. Facilities Planning Conference for Community-Junior College State-Level Personnel.

    ERIC Educational Resources Information Center

    Florida Univ., Gainesville. Inst. of Higher Education.

    This report on planning and developing facilities for community-junior colleges includes papers presented at a conference for state-level facility planners. The meeting covered the following areas: (1) development of physical facilities responsive to educational programs and community needs; (2) efficient use of existing facilities through…

  10. 30 CFR 254.22 - What information must I include in the “Introduction and plan contents” section?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.22...

  11. 30 CFR 254.22 - What information must I include in the “Introduction and plan contents” section?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.22...

  12. 30 CFR 254.22 - What information must I include in the “Introduction and plan contents” section?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.22...

  13. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 254.30 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans... transported at the facility; (3) There is a change in the name(s) or capabilities of the oil spill removal...

  14. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  15. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  16. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  17. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan. (v) In situ burning plan. (vi) Training and drills. ... response plan? (a) You must divide your response plan for OCS facilities into the sections specified in paragraph (b) and explained in the other sections of this subpart. The plan must have an easily found marker...

  18. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  19. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  20. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  1. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  2. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  3. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  4. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  5. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  6. 77 FR 18151 - Discharge Removal Equipment for Vessels Carrying Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions... ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... CGD 90-068] RIN 1625-AA02, Formerly 2115-AD66 Discharge Removal Equipment for Vessels Carrying Oil...

  7. Improving Long-Term Care Facility Disaster Preparedness and Response: A Literature Review.

    PubMed

    Pierce, J Rush; Morley, Sarah K; West, Theresa A; Pentecost, Percy; Upton, Lori A; Banks, Laura

    2017-02-01

    Long-term care facilities (LTCFs) and their residents are especially susceptible to disruptions associated with natural disasters and often have limited experience and resources for disaster planning and response. Previous reports have offered disaster planning and response recommendations. We could not find a comprehensive review of studied interventions or facility attributes that affect disaster outcomes in LTCFs and their residents. We reviewed articles published from 1974 through September 30, 2015, that studied disaster characteristics, facility characteristics, patient characteristics, or an intervention that affected outcomes for LTCFs experiencing or preparing for a disaster. Twenty-one articles were included in the review. All of the articles fell into 1 of the following categories: facility or disaster characteristics that predicted preparedness or response, interventions to improve preparedness, and health effects of disaster response, most often related to facility evacuation. All of the articles described observational studies that were heterogeneous in design and metrics. We believe that the evidence-based literature supports 6 specific recommendations for facilities, governmental agencies, health care communities and academia. These include integrated and coordinated disaster planning, staff training, careful consideration before governments order mandatory evacuations, anticipation of the increased medical needs of LTCF residents following a disaster, and the need for more outcomes research. (Disaster Med Public Health Preparedness. 2017;11:140-149).

  8. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  9. A Guide for Planning Facilities for Occupational Preparation Programs for Dental Laboratory Technicians. Research Series No. 34.

    ERIC Educational Resources Information Center

    Macconnell, James D., And Others

    The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…

  10. 30 CFR 254.51 - Modifying an existing OCS response plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast...

  11. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less

  12. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you must...

  13. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you must...

  14. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you must...

  15. 30 CFR 254.51 - Modifying an existing OCS response plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254.51...

  16. 30 CFR 254.52 - Following the format for an OCS response plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast...

  17. 30 CFR 254.51 - Modifying an existing OCS response plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254.51...

  18. 30 CFR 254.51 - Modifying an existing OCS response plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254.51...

  19. Implementing a bioterrorism response plan in your pharmacy.

    PubMed

    Teeter, David; Terriff, Colleen

    2002-01-01

    Pharmacies and other types of health care facilities need emergency response plans. Pharmacists need to stay current on biologic and other agents that can be used as agents of mass destruction and their clinical management. Local plans should incorporate federal resources that can be used in emergencies, but the time required for these resources to be organized, delivered, and distributed needs to be considered. Pharmacists are urged to assist with inventories of available health care facilities, supplies, and medications. Planning needs to be coordinated with local emergency preparedness officials.

  20. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Additional response plan... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Additional... Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or operator...

  1. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  2. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Dispersant use plan. (v) In situ burning plan. (vi) Training and drills. ...? (a) You must divide your response plan for OCS facilities into the sections specified in paragraph (b) of this section and explained in the other sections of this subpart. The plan must have an easily...

  3. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Dispersant use plan. (v) In situ burning plan. (vi) Training and drills. ...? (a) You must divide your response plan for OCS facilities into the sections specified in paragraph (b) of this section and explained in the other sections of this subpart. The plan must have an easily...

  4. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Dispersant use plan. (v) In situ burning plan. (vi) Training and drills. ...? (a) You must divide your response plan for OCS facilities into the sections specified in paragraph (b) of this section and explained in the other sections of this subpart. The plan must have an easily...

  5. 30 CFR 254.52 - Following the format for an OCS response plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254...

  6. 30 CFR 254.52 - Following the format for an OCS response plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254...

  7. 30 CFR 254.52 - Following the format for an OCS response plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line § 254...

  8. Manufacturing Planning Guide

    NASA Technical Reports Server (NTRS)

    Waid, Michael

    2011-01-01

    Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  9. 10 CFR 50.47 - Emergency plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... responsibilities for emergency response by the nuclear facility licensee and by State and local organizations... supporting organizations have been specifically established, and each principal response organization has... licensee's near-site Emergency Operations Facility have been made, and other organizations capable of...

  10. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 254.5 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL... plan requirements. (a) The response plan must provide for response to an oil spill from the facility... remove any spills of oil. (d) In addition to the requirements listed in this part, you must provide any...

  11. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Federal contingency plans. 300.210...

  12. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Federal contingency plans. 300.210...

  13. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Federal contingency plans. 300.210...

  14. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Federal contingency plans. 300.210...

  15. 30 CFR 254.1 - Who must submit a spill-response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.1 Who must submit a spill-response plan? (a) If you are the owner or operator of an oil handling... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Who must submit a spill-response plan? 254.1...

  16. 30 CFR 254.1 - Who must submit a spill-response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.1 Who must submit a spill-response plan? (a) If you are the owner or operator of an oil handling... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Who must submit a spill-response plan? 254.1...

  17. 30 CFR 254.1 - Who must submit a spill-response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.1 Who must submit a spill-response plan? (a) If you are the owner or operator of an oil handling... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Who must submit a spill-response plan? 254.1...

  18. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  19. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  20. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... divide your response plan for OCS facilities into the sections specified in paragraph (b) and explained in the other sections of this subpart. The plan must have an easily found marker identifying each.... (ii) Contractual agreements. (iii) Worst case discharge scenario. (iv) Dispersant use plan. (v) In...

  1. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Plans D Appendix D to Part 154 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Pt. 154, App. D Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan...

  2. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  3. 30 CFR 254.7 - How do I submit my response plan to the MMS?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Boulevard, New Orleans, LA 70123-2394. (c) Send plans for facilities in the Pacific Ocean (except seaward of...? 254.7 Section 254.7 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT..., Anchorage, AK 99508-4302. (b) Send plans for facilities in the Gulf of Mexico or Atlantic Ocean to: Minerals...

  4. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  7. Systems Engineering Simulator (SES) Simulator Planning Guide

    NASA Technical Reports Server (NTRS)

    McFarlane, Michael

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  8. Computational Electromagnetics (CEM) Laboratory: Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Khayat, Michael A.

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CEM Laboratory. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  9. Achieving walkable city in Indonesia: Policy and responsive design through public participation

    NASA Astrophysics Data System (ADS)

    Tanan, Natalia; Darmoyono, Laksmi

    2017-11-01

    This paper discusses approaches to policy and planning of pedestrian facility that facilitate walking in cities in Indonesia. It applies quantitative and qualitative methods to analyze walkability in some cities. The new perspective in policy and planning are focusing on improving non-motorized mobility; it encourages walking and put the provision of the pedestrian facility as an integral part of built environmental planning and development. The policy perceives pedestrian facility in broad, not only about physical development, but also benefit to socioeconomic activity and environmental quality. It is expected that the implementation of policies and walkability concept could upgrade the pedestrian facility, as a walkable city delivers green atmosphere of the urban environment. A design competition of pedestrian facility was held to test the policy and accommodate input from the public. Public participation through competition also enriches the design of pedestrian facility that responsive to local condition. Implementation is still a challenge due to limited budget; however, there are tendencies that few cities improve pedestrian facilities to encourage people walking in order to make the city livable and environmentally friendly.

  10. 30 CFR 254.27 - What information must I include in the “Dispersant use plan” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities... the oils handled, stored, or transported at the facility; (b) A summary of toxicity data for these...

  11. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... response plan based on the criteria in paragraph (f)(1) of this section, the owner or operator shall submit..., and is required to prepare and submit a response plan based on the criteria in paragraph (f)(1) of..., based on the factors in paragraph (f)(3) of this section. If such a determination is made, the Regional...

  12. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... response plan based on the criteria in paragraph (f)(1) of this section, the owner or operator shall submit..., and is required to prepare and submit a response plan based on the criteria in paragraph (f)(1) of..., based on the factors in paragraph (f)(3) of this section. If such a determination is made, the Regional...

  13. 30 CFR 254.24 - What information must I include in the “Equipment inventory” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.24 What information...: (a) An inventory of spill-response materials and supplies, services, equipment, and response vessels...

  14. 30 CFR 254.24 - What information must I include in the “Equipment inventory” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.24 What... include: (a) An inventory of spill-response materials and supplies, services, equipment, and response...

  15. 30 CFR 254.24 - What information must I include in the “Equipment inventory” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.24 What... include: (a) An inventory of spill-response materials and supplies, services, equipment, and response...

  16. 30 CFR 254.24 - What information must I include in the “Equipment inventory” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.24 What... include: (a) An inventory of spill-response materials and supplies, services, equipment, and response...

  17. Hurricane Preparedness and Control Plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This plan establishes policy and sets forth guidance, responsibilities and procedures utilized by Federal Electric Corp., communications department in support of the KSC Emergency Preparedness Plan, Annex A, Hurricane Control Plan (GP-355) dated 27 May 1971. This plan covers all FEC communications department personnel, facilities, and equipment situated at the Kennedy Space Center that are the responsibility of FEC contract NAS 10-4967.

  18. 30 CFR 254.51 - Modifying an existing OCS response plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Modifying an existing OCS response plan. 254.51 Section 254.51 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response...

  19. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  1. 30 CFR 254.24 - What information must I include in the “Equipment inventory” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities... inventory appendix” must include: (a) An inventory of spill-response materials and supplies, services...

  2. Inland area contingency plan and maps for Pennsylvania (on CD-ROM). Data file

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    EPA Region III has assembled on this CD a multitude of environmental data, in both visual and textual formats. While targeted for Facility Response Planning under the Oil Pollution Act of 1990, this information will prove helpful to anyone in the environmental arena. Specifically, the CD will aid contingency planning and emergency response personnel. Combining innovative GIS technology with EPA`s state-specific data allows you to display maps, find and identify map features, look at tabular information about map features, and print out maps. The CD was designed to be easy to use and incorporates example maps as well as helpmore » sections describing the use of the environmental data on the CD, and introduces you to the IACP Viewer and its capabilities. These help features will make it easy for you to conduct analysis, produce maps, and browse the IACP Plan. The IACP data are included in two formats: shapefiles, which can be viewed with the IACP Viewer or ESRI`s ArcView software (Version 2.1 or higher), and ARC/INFO export files, which can be imported into ARC/INFO or converted to other GIS data formats. Point Data Sources: Sensitive Areas, Surface Drinking Water Intakes, Groundwater Intakes, Groundwater Supply Facilities, NPL (National Priority List) Sites, FRP (Facility Response Plan) Facilities, NPDES (National Pollutant Discharge Elimination System) Facilities, Hospitals, RCRA (Resource Conservation and Recovery Act) Sites, TRI (Toxic Release Inventory) Sites, CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) Sites Line Data Sources: TIGER Roads, TIGER Railroads, TIGER Hydrography, Pipelines Polygon Data Sources: State Boundaries, County Boundaries, Watershed Boundaries (8-digit HUC), TIGER Hydrography, Public Lands, Populated Places, IACP Boundaries, Coast Guard Boundaries, Forest Types, US Congressional Districts, One-half Mile Buffer of Surface Drinking Water Intakes.« less

  3. Inland area contingency plan and maps for Virginia (on CD-ROM). Data file

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    EPA Region III has assembled on this CD a multitude of environmental data, in both visual and textual formats. While targeted for Facility Response Planning under the Oil Pollution Act of 1990, this information will prove helpful to anyone in the environmental arena. Specifically, the CD will aid contingency planning and emergency response personnel. Combining innovative GIS technology with EPA`s state-specific data allows you to display maps, find and identify map features, look at tabular information about map features, and print out maps. The CD was designed to be easy to use and incorporates example maps as well as helpmore » sections describing the use of the environmental data on the CD, and introduces you to the IACP Viewer and its capabilities. These help features will make it easy for you to conduct analysis, produce maps, and browse the IACP Plan. The IACP data are included in two formats: shapefiles, which can be viewed with the IACP Viewer or ESRI`s ArcView software (Version 2.1 or higher), and ARC/INFO export files, which can be imported into ARC/INFO or converted to other GIS data formats. Point Data Sources: Sensitive Areas, Surface Drinking Water Intakes, Groundwater Intakes, Groundwater Supply Facilities, NPL (National Priority List) Sites, FRP (Facility Response Plan) Facilities, NPDES (National Pollutant Discharge Elimination System) Facilities, Hospitals, RCRA (Resource Conservation and Recovery Act) Sites, TRI (Toxic Release Inventory) Sites, CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) Sites Line Data Sources: TIGER Roads, TIGER Railroads, TIGER Hydrography, Pipelines Polygon Data Sources: State Boundaries, County Boundaries, Watershed Boundaries (8-digit HUC), TIGER Hydrography, Public Lands, Populated Places, IACP Boundaries, Coast Guard Boundaries, Forest Types, US Congressional Districts, One-half Mile Buffer of Surface Drinking Water Intakes.« less

  4. 30 CFR 254.26 - What information must I include in the “Worst case discharge scenario” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.26... the facility that oil could move in a time period that it reasonably could be expected to persist in...

  5. 30 CFR 254.26 - What information must I include in the “Worst case discharge scenario” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.26... the facility that oil could move in a time period that it reasonably could be expected to persist in...

  6. 30 CFR 254.26 - What information must I include in the “Worst case discharge scenario” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.26... the facility that oil could move in a time period that it reasonably could be expected to persist in...

  7. Team processes in airway facilities operations control centers.

    DOT National Transportation Integrated Search

    2000-07-01

    In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...

  8. Using principles from emergency management to improve emergency response plans for research animals.

    PubMed

    Vogelweid, Catherine M

    2013-10-01

    Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.

  9. Chamber B Thermal/Vacuum Chamber: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Mike E.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Audio Development Laboratory (ADL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Romero, Andy

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Electronic Systems Test Laboratory (ESTL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Robinson, Neil

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Advanced Materials Laboratory User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. Structures Test Laboratory (STL). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Zipay, John J.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. 30 CFR 254.20 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.20 Purpose. This subpart describes the requirements for preparing spill...

  15. 30 CFR 254.20 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.20 Purpose. This subpart describes the requirements for preparing spill...

  16. 30 CFR 254.20 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.20 Purpose. This subpart describes the requirements for preparing spill...

  17. 30 CFR 254.25 - What information must I include in the “Contractual agreements” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.25 What... must furnish proof of any contracts or membership agreements with OSRO's, cooperatives, spill-response...

  18. 30 CFR 254.29 - What information must I include in the “Training and drills” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities... spill-response management team and the qualified individual. The types of training given to the members...

  19. 30 CFR 254.25 - What information must I include in the “Contractual agreements” appendix?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities..., spill-response service providers, or spill management team members who are not your employees that you...

  20. 30 CFR 254.25 - What information must I include in the “Contractual agreements” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.25 What... must furnish proof of any contracts or membership agreements with OSRO's, cooperatives, spill-response...

  1. 30 CFR 254.25 - What information must I include in the “Contractual agreements” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.25 What information... furnish proof of any contracts or membership agreements with OSRO's, cooperatives, spill-response service...

  2. 30 CFR 254.25 - What information must I include in the “Contractual agreements” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.25 What... must furnish proof of any contracts or membership agreements with OSRO's, cooperatives, spill-response...

  3. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  4. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... response plan is completed. FEMA and other Federal agencies will participate in training, exercises, and drills, in support of the licensee offsite emergency response plan. (e) In carrying out paragraphs (a.... This information will identify Federal agencies which are to be included in the plan, the extent and...

  5. How to Tackle Tough Facility Design Considerations

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    This article is part of a series that has offered insight on planning a facilities project, hiring professionals, delivery system options and owner's responsibilities. In this article, the author focuses on some of the planning and design concepts one may be asked to consider in providing direction to his design and construction team. These…

  6. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... areas of special economic and environmental importance that may be impacted and the strategies for their protection. (d) The Regional Supervisor may specify how to address the elements of a Regional Response Plan...

  7. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...

  8. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...

  9. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...

  10. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Schaschl, Leslie

    2011-01-01

    The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.

  12. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. 30 CFR 254.29 - What information must I include in the “Training and drills” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.29 What information...) Identify and include the dates of the training provided to members of the spill-response management team...

  15. 30 CFR 254.29 - What information must I include in the “Training and drills” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.29 What...) Identify and include the dates of the training provided to members of the spill-response management team...

  16. 30 CFR 254.29 - What information must I include in the “Training and drills” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.29 What...) Identify and include the dates of the training provided to members of the spill-response management team...

  17. 30 CFR 254.29 - What information must I include in the “Training and drills” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.29 What...) Identify and include the dates of the training provided to members of the spill-response management team...

  18. 44 CFR 350.5 - Criteria for review and approval of State and local radiological emergency plans and preparedness.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... response by the nuclear facility licensee, and by State and local organizations within the Emergency Planning Zones have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established and each principal response organization has staff to respond to and...

  19. 44 CFR 350.5 - Criteria for review and approval of State and local radiological emergency plans and preparedness.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... response by the nuclear facility licensee, and by State and local organizations within the Emergency Planning Zones have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established and each principal response organization has staff to respond to and...

  20. 33 CFR 155.1040 - Response plan requirements for unmanned tank barges carrying oil as a primary cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the towing vessel crew and facility or fleeting area personnel, if any, to initiate a response and... functional areas and must further include information for key components within each functional area: (i...) Spill response operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The...

  1. 33 CFR 155.1040 - Response plan requirements for unmanned tank barges carrying oil as a primary cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the towing vessel crew and facility or fleeting area personnel, if any, to initiate a response and... functional areas and must further include information for key components within each functional area: (i...) Spill response operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The...

  2. 33 CFR 155.1040 - Response plan requirements for unmanned tank barges carrying oil as a primary cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the towing vessel crew and facility or fleeting area personnel, if any, to initiate a response and... functional areas and must further include information for key components within each functional area: (i...) Spill response operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The...

  3. 33 CFR 155.1040 - Response plan requirements for unmanned tank barges carrying oil as a primary cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the towing vessel crew and facility or fleeting area personnel, if any, to initiate a response and... functional areas and must further include information for key components within each functional area: (i...) Spill response operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The...

  4. 30 CFR 254.52 - Following the format for an OCS response plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Following the format for an OCS response plan. 254.52 Section 254.52 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill...

  5. 30 CFR 254.2 - When must I submit a response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false When must I submit a response plan? 254.2 Section 254.2 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.2...

  6. 30 CFR 254.2 - When must I submit a response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false When must I submit a response plan? 254.2 Section 254.2 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.2...

  7. 30 CFR 254.2 - When must I submit a response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false When must I submit a response plan? 254.2 Section 254.2 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.2...

  8. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  9. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  10. 40 CFR Appendix E to Part 112 - Determination and Evaluation of Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 2, 3, 4, 5) or non-persistent (Group 1)]; and the facility's specific operating area. See sections 1... facility [persistent (Groups 2, 3, or 4) or non-persistent (Group 1)]; and the geographic area(s) in which... non-petroleum oil, fat, or grease of animal, fish, or marine mammal origin. Animal fats are further...

  11. 40 CFR Appendix E to Part 112 - Determination and Evaluation of Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 2, 3, 4, 5) or non-persistent (Group 1)]; and the facility's specific operating area. See sections 1... facility [persistent (Groups 2, 3, or 4) or non-persistent (Group 1)]; and the geographic area(s) in which... non-petroleum oil, fat, or grease of animal, fish, or marine mammal origin. Animal fats are further...

  12. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  13. 40 CFR Appendix E to Part 112 - Determination and Evaluation of Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 2, 3, 4, 5) or non-persistent (Group 1)]; and the facility's specific operating area. See sections 1... facility [persistent (Groups 2, 3, or 4) or non-persistent (Group 1)]; and the geographic area(s) in which... non-petroleum oil, fat, or grease of animal, fish, or marine mammal origin. Animal fats are further...

  14. Management self assessment plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debban, B.L.

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less

  15. 30 CFR 254.42 - Exercises for your response personnel and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... facility or at a corporate location designated in the plan. Records showing that OSRO's and oil spill...) An annual spill management team tabletop exercise. The exercise must test the spill management team's...

  16. 30 CFR 254.42 - Exercises for your response personnel and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... facility or at a corporate location designated in the plan. Records showing that OSRO's and oil spill...) An annual spill management team tabletop exercise. The exercise must test the spill management team's...

  17. 40 CFR 35.2214 - Grantee responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responsibilities. (a) The grantee shall complete the project in accordance with the grant agreement including: The facilities plan that establishes the need for the project; the design drawings and specifications; the plan... treatment works; the project schedule; and all other applicable regulations. The grantee shall maintain and...

  18. 33 CFR 154.1240 - Specific requirements for animal fats and vegetable oils facilities that could reasonably be...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... fats and vegetable oils facilities that could reasonably be expected to cause substantial harm to the... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1240 Specific requirements for animal fats and vegetable...

  19. Inland area contingency plan and maps for Delaware, Maryland, West Virginia, District of Columbia (on CD-ROM). Data file

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    EPA Region III has assembled on this CD a multitude of environmental data, in both visual and textual formats. While targeted for Facility Response Planning under the Oil Pollution Act of 1990, this information will prove helpful to anyone in the environmental arena. Specifically, the CD will aid contingency planning and emergency response personnel. Combining innovative GIS technology with EPA`s state-specific data allows you to display maps, find and identify map features, look at tabular information about map features, and print out maps. The CD was designed to be easy to use and incorporates example maps as well as helpmore » sections describing the use of the environmental data on the CD, and introduces you to the IACP Viewer and its capabilities. These help features will make it easy for you to conduct analysis, produce maps, and browse the IACP Plan. The IACP data are included in two formats: shapefiles, which can be viewed with the IACP Viewer or ESRI`s ArcView software (Version 2.1 or higher), and ARC/INFO export files, which can be imported into ARC/INFO or converted to other GIS data formats. Point Data Sources: Sensitive Areas, Surface Drinking Water Intakes, Groundwater Intakes, Groundwater Supply Facilities, NPL (National Priority List) Sites, FRP (Facility Response Plan) Facilities, NPDES (National Pollutant Discharge Elimination System) Facilities, Hospitals, RCRA (Resource Conservation and Recovery Act) Sites, TRI (Toxic Release Inventory) Sites, CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) Sites Line Data Sources: TIGER Roads, TIGER Railroads, TIGER Hydrography, Pipelines Polygon Data Sources: State Boundaries, County Boundaries, Watershed Boundaries (8-digit HUC), TIGER Hydrography, Public Lands, Populated Places, IACP Boundaries, Coast Guard Boundaries, Forest Types, US Congressional Districts, One-half Mile Buffer of Surface Drinking Water Intakes.« less

  20. 30 CFR 254.7 - How do I submit my response plan to the BSEE?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false How do I submit my response plan to the BSEE? 254.7 Section 254.7 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE...

  1. 30 CFR 254.7 - How do I submit my response plan to the BSEE?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false How do I submit my response plan to the BSEE? 254.7 Section 254.7 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE...

  2. 30 CFR 254.2 - When must I submit a response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When must I submit a response plan? 254.2 Section 254.2 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.2 When must I submit a...

  3. 30 CFR 254.7 - How do I submit my response plan to the BSEE?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false How do I submit my response plan to the BSEE? 254.7 Section 254.7 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE...

  4. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or operator of a TAPAA facility shall include the following information in the Prince William Sound appendix to... for personnel, including local residents and fishermen, from the following locations in Prince William...

  5. Integrated Facilities and Infrastructure Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reisz Westlund, Jennifer Jill

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less

  6. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. A Guide for Planning Facilities for Occupational Preparation Programs in the Machine Trades. Interim Report. Research 24.

    ERIC Educational Resources Information Center

    Larson, Milton E.

    This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…

  8. Facility Response Planning: Compliance Assistance Guide

    EPA Pesticide Factsheets

    This guide was developed in order to help owners and operators of facilities that store or use oil, as well as other interested people, to better understand the Federal Oil Pollution Prevention regulation.

  9. Planning for a Healthier School Facility

    ERIC Educational Resources Information Center

    Belew, Rachel

    2012-01-01

    One might assume that, within the walls of a school, it is the shared responsibility of the school nurse, guidance counselor, physical fitness instructor, and food services staff to protect student health. In truth, such an important responsibility also belongs, in very large part, to the educational facility planner and school maintenance staff.…

  10. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  11. 33 CFR 154.1210 - Purpose and applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1210 Purpose and applicability. (a) The requirements of this... fats or vegetable oils including— (1) A fixed MTR facility capable of transferring oil in bulk, to or...

  12. 33 CFR 154.1210 - Purpose and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1210 Purpose and applicability. (a) The requirements of this... fats or vegetable oils including— (1) A fixed MTR facility capable of transferring oil in bulk, to or...

  13. Lewis Research Center space station electric power system test facilities

    NASA Technical Reports Server (NTRS)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  14. Future aerospace ground test facility requirements for the Arnold Engineering Development Center

    NASA Technical Reports Server (NTRS)

    Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.

    1992-01-01

    Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.

  15. Twenty-Five Year Site Plan FY2013 - FY2037

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, William H.

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also usesmore » the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.« less

  16. Susan Parker Bodine, Letter to Brian Jennings of American Coalition for Ethanol, November 7, 2006

    EPA Pesticide Factsheets

    This letter responds to correspondence concerning the applicability of EPA's Facility Response Plan (FRP) regulations to ethanol production and storage facilities and whether denatured ethanol is an oil.

  17. 77 FR 61631 - Final Environmental Impact Statement for Stehekin River Corridor Implementation Plan, Lake Chelan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... management of park facilities (e.g., roads, bridges, trails, maintenance yard) in response to increased... Meadows, while retaining private access to the area via a 0.75-mile-long reduced maintenance road... maintenance and residential facilities from floodplain areas, construction of recreational facilities and...

  18. 42 CFR 485.64 - Condition of participation: Disaster procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... their application, and be assigned specific responsibilities. (a) Standard: Disaster plan. The facility's written disaster plan must be developed and maintained with assistance of qualified fire, safety, and other appropriate experts. The plan must include— (1) Procedures for prompt transfer of casualties...

  19. 42 CFR 485.64 - Condition of participation: Disaster procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... their application, and be assigned specific responsibilities. (a) Standard: Disaster plan. The facility's written disaster plan must be developed and maintained with assistance of qualified fire, safety, and other appropriate experts. The plan must include— (1) Procedures for prompt transfer of casualties...

  20. 42 CFR 485.64 - Condition of participation: Disaster procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... their application, and be assigned specific responsibilities. (a) Standard: Disaster plan. The facility's written disaster plan must be developed and maintained with assistance of qualified fire, safety, and other appropriate experts. The plan must include— (1) Procedures for prompt transfer of casualties...

  1. 42 CFR 485.64 - Condition of participation: Disaster procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... their application, and be assigned specific responsibilities. (a) Standard: Disaster plan. The facility's written disaster plan must be developed and maintained with assistance of qualified fire, safety, and other appropriate experts. The plan must include— (1) Procedures for prompt transfer of casualties...

  2. Cross-sectional Survey of Long-Term Care Facilities in the Rockaway Peninsula: Preparedness and Response During Hurricane Sandy.

    PubMed

    Jiang, Lynn; Tedeschi, Christopher; Subaiya, Saleena

    2018-04-01

    Few studies have described the challenges experienced by long-term care facilities (LTCFs) following Hurricane Sandy. This study examined LTCF preparedness and experiences during and after the storm. A cross-sectional survey was conducted 2 years after Hurricane Sandy to assess LTCF demographics, preparation, and post-storm resources. Surveys were conducted at LTCFs located on the Rockaway Peninsula of New York City. All LTCFs located in a heavily affected area were approached. Of 29 facilities, 1 had closed, 5 did not respond, 9 declined to participate, and 14 participated, yielding a response rate of 50% for open facilities. Twenty-one percent of the facilities had preparations specifically for hurricanes. More than 70% of the facilities had lost electricity, heat, and telephone service, and one-half had evacuated. Twenty-one percent of the facilities reported not receiving any assistance and over one-half reported that relief resources did not meet their needs. Many LTCFs lacked plans specific to such a large-scale event. Since nearly all of the LTCFs in the region were affected, preexisting transportation and housing plans may have been inadequate. Future preparation could include hazard-specific planning and reliance on resources from a wider geographic area. Access to electricity emerged as a top priority. (Disaster Med Public Health Preparedness. 2018;12:194-200).

  3. Chemical Emergency Preparedness and Prevention on Tribal Lands

    EPA Pesticide Factsheets

    This fact sheet familiarizes tribal leaders with EPCRA and Chemical Accident Prevention Program requirements. Tribal Emergency Response Commissions (TERCs) can appoint LEPCs, develop contingency plans, and review facilities' Risk Management Plans.

  4. ERLN Activities Details

    EPA Pesticide Factsheets

    Environmental Response Laboratory Network activities include the All Hazard Receipt Facility and Screening Protocol, standardizing chemical methods, Chemical Warfare Agent Fixed Laboratory Pilot Project, microbial efforts, and WLA response plan.

  5. 76 FR 68747 - Agency Information Collection Activities OMB Responses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... Polymeric Coating of Supporting Substrates Facilities; 40 CFR part 60, subparts A and VVV; was approved on....10; Oil Pollution Act Facility Response Plans (Renewal); 40 CFR 112.20 and 112.21; was approved on 10... comment on 10/25/2011. EPA ICR Number 2439.01; NESHAP for Natural Gas Transmission and Storage; in 40 CFR...

  6. 30 CFR 254.27 - What information must I include in the “Dispersant use plan” appendix?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.27 What... location of the dispersants and other chemical or biological products which you might use on the oils...

  7. 30 CFR 254.27 - What information must I include in the “Dispersant use plan” appendix?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.27 What... location of the dispersants and other chemical or biological products which you might use on the oils...

  8. 30 CFR 254.27 - What information must I include in the “Dispersant use plan” appendix?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.27 What information... of the dispersants and other chemical or biological products which you might use on the oils handled...

  9. 30 CFR 254.27 - What information must I include in the “Dispersant use plan” appendix?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.27 What... location of the dispersants and other chemical or biological products which you might use on the oils...

  10. 40 CFR 264.52 - Content of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...

  11. 40 CFR 264.52 - Content of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...

  12. 40 CFR 264.52 - Content of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...

  13. Emergency preparedness and planning

    NASA Technical Reports Server (NTRS)

    Bouvier, Kenneth

    1993-01-01

    Monsanto's emergency response plan in dealing with hazardous materials at their facilities is presented. Topics discussed include the following: CPR training; emergency medial training; incident reports; contractor injuries; hazardous materials transport; evacuation; and other industrial safety concerns.

  14. The impact of correctional institutions on public health during a pandemic or emerging infection disaster.

    PubMed

    Schwartz, Rachel D

    2008-01-01

    With the growing threat of a naturally occurring or man-made global pandemic, many public, private, federal, state, and local institutions have begun to develop some form of preparedness and response plans. Among those in the front lines of preparedness are hospitals and medical professionals who will be among the first responders in the event of such a disaster. At the other end of the spectrum of preparedness is the Corrections community who have been working in a relative vacuum, in part because of lack of funding, but also because they have been largely left out of state, federal local planning processes. This isolation and lack of support is compounded by negative public perceptions of correctional facilities and their inmates, and a failure to understand the serious impact a jail or prison facility would have on public health in the event of a disaster. This article examines the unique issues faced by correctional facilities responding to disease disasters and emphasizes the importance of assisting them to develop workable and effective preparedness and response plans that will prevent them from becoming disease repositories spreading illness and infection throughout our communities. To succeed in such planning, it is crucial that the public health and medical community be involved in correctional disaster planning and that they should integrate correctional disaster response with their own. Failure to do so endangers the health of the entire nation.

  15. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  16. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  17. Applying social science and public health methods to community-based pandemic planning.

    PubMed

    Danforth, Elizabeth J; Doying, Annette; Merceron, Georges; Kennedy, Laura

    2010-11-01

    Pandemic influenza is a unique threat to communities, affecting schools, businesses, health facilities and individuals in ways not seen in other emergency events. This paper aims to outline a local government project which utilised public health and social science research methods to facilitate the creation of an emergency response plan for pandemic influenza coincidental to the early stages of the 2009 H1N1 ('swine flu') outbreak. A multi-disciplinary team coordinated the creation of a pandemic influenza emergency response plan which utilised emergency planning structure and concepts and encompassed a diverse array of county entities including schools, businesses, community organisations, government agencies and healthcare facilities. Lessons learned from this project focus on the need for (1) maintaining relationships forged during the planning process, (2) targeted public health messaging, (3) continual evolution of emergency plans, (4) mutual understanding of emergency management concepts by business and community leaders, and (5) regional coordination with entities outside county boundaries.

  18. RMP Guidance for Chemical Distributors - Chapter 8: Emergency Response Program

    EPA Pesticide Factsheets

    Depending on the level of processes at your facility, part 68 may require an emergency response program: an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date.

  19. Systemwide board assessment.

    PubMed

    Hafertepe, E C

    1987-01-01

    The Sisters of Charity Health Care System (SCHCS), Inc., Cincinnati, undertook a systemwide board evaluation project to support and enhance effective aspects of governance and to deal with obstacles that often arise due to differing beliefs and role confusion. A task force of chief executive officers developed the questionnaire, which was then administered to members of individual facilities' boards and the system's board. The documented highlighted value issues important to SCHCS's ministry and business activities: overall board responsibilities, financial responsibilities, strategic planning, the board's role, committee structures, the board's operating process, board education, and overall board effectiveness. The responses from each member were returned to the local boards, who analyzed them and developed an action plan. A summary of each facility's responses and action plans were forwarded to the system's corporate office. The CEO committee critiqued the process and reported on significant issues and action plans. In general, survey results revealed a strong influence of mission and philosophy in decision making, support for current processes, and effective interaction among board members. The system's corporate office will use the responses to respond to a dynamic environment and strengthen their role in the delivery of Catholic health care services.

  20. Strengthening TB infection control in specialized health facilities in Romania--using a participatory approach.

    PubMed

    Turusbekova, N; Popa, C; Dragos, M; van der Werf, M J; Dinca, I

    2016-02-01

    In 2012, the tuberculosis (TB) notification rate among Romanian TB facility doctors and nurses was 7.2 times higher than in the general population. This indicates that transmission is ongoing inside TB facilities and that TB infection control measures are insufficient. To help prevent nosocomial TB transmission a project was implemented that aimed at providing nationwide tailor-made technical assistance in TB infection control (TB-IC) in TB treatment facilities, including the development of TB infection control plans. The objective of the present article is to describe the implementation of the project and to discuss successes and challenges. The project was an implementation study using two methods of evaluation: (1) a cross sectional questionnaire study; and (2) collection of information, during the training, on challenges related to infection control and to the project implementation. The project team developed a TB facility infection control (TB-IC) plan template, together with the Romanian experts. The template was discussed and agreed upon with the experts at a meeting and thereafter distributed by email to all TB facilities. Afterwards, a training of trainers (TOT) seminar was organized which included the provision of information about different training methods, as well as information about TB-IC. The TOT was followed by training for key TB-IC providers. Information about use of the TB-IC template was gathered through a self-administered questionnaire sent to all participants of the expert meeting and the training (42 people). Additionally, non-systematized discussions were held on broader challenges in TB-IC implementation during the training. Within the project 42 key TB-IC service providers were trained in TB-IC, including 9 who were trained at a TOT seminar. The trainees were specialists working at the national level, such as country TB coordinators, or at the TB facility level: TB doctors, epidemiologists, laboratory specialists and maintenance engineers. Out of 42 key TB-IC service providers who were trained, only eighteen responded to the questionnaire (no reminders were sent). Out of these, 14 had used the TB-IC plan template after the project team disseminated it to them by email. The remaining four TB-IC service providers indicated that they were planning to use the template to develop or update their facility TB-IC plans. Related to the use of TB-IC plan template, the following broader challenges in TB-IC were identified: a lack of authority of the individuals responsible for TB-IC to implement the TB-IC measures, lack of training among facility epidemiologists on TB, underdeveloped system for reporting TB in healthcare workers, difficulties with triage of the TB suspects, and poor facility infrastructure hampering implementation of TB-IC measures. Implementing TB-IC plans in Romanian health care facilities proved to be challenging, mainly due to the fact that the national infection control plan for TB was not yet adopted at the time of project implementation, and therefore there was neither a regulatory framework to support TB facility-IC planning nor any related budget allocations for the implementation of the facilities' TB-IC plans. Nonetheless, most respondents who answered the questionnaire (18 of 42 responded) indicated that they had started using the TB-IC plan template, which represents a full package of infection control measures that, when implemented effectively and in its entirety, may be expected to reduce nosocomial transmission. The study's limitations are: very low survey response rate, thus there is a likelihood of responder bias. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  1. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  2. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  3. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  4. 77 FR 55864 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    .... ML111940200), which approved the RBS Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in the licensee's letter dated April 4, 2011... consequences of an accident previously evaluated? Response: No. The proposed change to the Cyber Security Plan...

  5. Oil, biological communities and contingency planning

    USGS Publications Warehouse

    Albers, P.H.; Frink, Lynne; Ball-Weir, Katherine; Smith, Charlotte

    1995-01-01

    The Oil Pollution Act of 1990 mandates the inclusion of a fish and wildlife response plan in the National Contingency Plan (NCP) and the creation of Area Committees that must develop an Area Contingency Plan (ACP). Area Contingency Plans must include a detailed annex containing a Fish and Wildlife and Sensitive Environments Plan. Tank vessels, offshore facilities, and certain onshore facilities must have response plans consistent with the requirements of the NCP and the ACP. New regulations to supersede the Type A and B procedures of the Natural Resources Damage Assessment Regulations are being developed for oil spills. Currently, four assessment methods have been proposed: (1) Type A, (2) comprehensive (Type B), (3) intermediate (between types A and B), and (4) compensation tables. The Oil Spill Liability Trust Fund is approaching its ceiling of $1 billion, but only $50 million has been appropriated. Effective biological contingency planning requires extensive knowledge of (1) the environmental fate of petroleum, (2) the effects of petroleum on organisms, (3) the existing biological resources, and (4) the establishment of a system of biological priorities. The characteristics and fate of petroleum and the biological effects of petroleum are reviewed. Assessment of biological resources includes plant and animal distributions, important habitat, endangered or threatened species, and economic considerations. The establishment by Area Committees of priorities for environmental protection, injury assessment, and restoration will promote efficient spill response. Three special issues are discussed: (1) improving our ability to restore natural resources, (2) the potential role of biological diversity in spill response planning, and (3) planning for animal rehabilitation.

  6. Cooperative Program and Facilities Planning, Southern Maine Vocational Technical Institute--University of Maine at Portland-Gorham. Final Report: Higher Education Facilities Planning Grant.

    ERIC Educational Resources Information Center

    Pressley, Warren H., Jr.

    In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…

  7. Radioactive Waste Management and Nuclear Facility Decommissioning Progress in Iraq - 13216

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Musawi, Fouad; Shamsaldin, Emad S.; Jasim, Hadi

    2013-07-01

    Management of Iraq's radioactive wastes and decommissioning of Iraq's former nuclear facilities are the responsibility of Iraq's Ministry of Science and Technology (MoST). The majority of Iraq's former nuclear facilities are in the Al-Tuwaitha Nuclear Research Center located a few kilometers from the edge of Baghdad. These facilities include bombed and partially destroyed research reactors, a fuel fabrication facility and radioisotope production facilities. Within these facilities are large numbers of silos, approximately 30 process or waste storage tanks and thousands of drums of uncharacterised radioactive waste. There are also former nuclear facilities/sites that are outside of Al-Tuwaitha and these includemore » the former uranium processing and waste storage facility at Jesira, the dump site near Adaya, the former centrifuge facility at Rashdiya and the former enrichment plant at Tarmiya. In 2005, Iraq lacked the infrastructure needed to decommission its nuclear facilities and manage its radioactive wastes. The lack of infrastructure included: (1) the lack of an organization responsible for decommissioning and radioactive waste management, (2) the lack of a storage facility for radioactive wastes, (3) the lack of professionals with experience in decommissioning and modern waste management practices, (4) the lack of laws and regulations governing decommissioning or radioactive waste management, (5) ongoing security concerns, and (6) limited availability of electricity and internet. Since its creation eight years ago, the MoST has worked with the international community and developed an organizational structure, trained staff, and made great progress in managing radioactive wastes and decommissioning Iraq's former nuclear facilities. This progress has been made, despite the very difficult implementing conditions in Iraq. Within MoST, the Radioactive Waste Treatment and Management Directorate (RWTMD) is responsible for waste management and the Iraqi Decommissioning Directorate (IDD) is responsible for decommissioning activities. The IDD and the RWTMD work together on decommissioning projects. The IDD has developed plans and has completed decommissioning of the GeoPilot Facility in Baghdad and the Active Metallurgical Testing Laboratory (LAMA) in Al-Tuwaitha. Given this experience, the IDD has initiated work on more dangerous facilities. Plans are being developed to characterize, decontaminate and decommission the Tamuz II Research Reactor. The Tammuz Reactor was destroyed by an Israeli air-strike in 1981 and the Tammuz II Reactor was destroyed during the First Gulf War in 1991. In addition to being responsible for managing the decommissioning wastes, the RWTMD is responsible for more than 950 disused sealed radioactive sources, contaminated debris from the first Gulf War and (approximately 900 tons) of naturally-occurring radioactive materials wastes from oil production in Iraq. The RWTMD has trained staff, rehabilitated the Building 39 Radioactive Waste Storage building, rehabilitated portions of the French-built Radioactive Waste Treatment Station, organized and secured thousands of drums of radioactive waste organized and secured the stores of disused sealed radioactive sources. Currently, the IDD and the RWTMD are finalizing plans for the decommissioning of the Tammuz II Research Reactor. (authors)« less

  8. 33 CFR 154.1035 - Specific requirements for facilities that could reasonably be expected to cause significant and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... spill mitigation procedures. (i) This subsection must describe the volume(s) and oil groups that would... applicable, the worst case discharge from the non-transportation-related facility. This must be the same volume provided in the response plan for the non-transportation-related facility. (ii) This subsection...

  9. When a disaster strikes without warning: how effective is your response plan?

    PubMed

    Steiner, P J

    2001-01-01

    When an outside high-pressure natural gas line was cut near the intakes to a hospital's ventilation system, gas was quickly dispersed throughout the building. The facility's disaster management plan faced a real-life test.

  10. It Takes Two.

    ERIC Educational Resources Information Center

    Ballard, Ken

    2000-01-01

    Discusses planning points when negotiating joint ventures for designing public recreational facilities. The obstacle and impact of money in the negotiations is examined as are handling the definition of operational responsibilities, personnel and maintenance, program and service delivery, and progress of the partnership and facility itself. (GR)

  11. 40 CFR Appendix E to Part 112 - Determination and Evaluation of Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 1.2.3Non-persistent oils or Group 1 oils include: (1) A petroleum-based oil that, at the time of...-based oil that does not meet the distillation criteria for a non-persistent oil. Persistent oils are... appropriate group(s) for the types of oil handled, stored, or transported at the facility [persistent (Groups...

  12. 40 CFR Appendix E to Part 112 - Determination and Evaluation of Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... 1.2.3Non-persistent oils or Group 1 oils include: (1) A petroleum-based oil that, at the time of...-based oil that does not meet the distillation criteria for a non-persistent oil. Persistent oils are... appropriate group(s) for the types of oil handled, stored, or transported at the facility [persistent (Groups...

  13. 40 CFR 256.11 - Recommendations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Identification of Responsibilities... facilities. (d) Responsibilities should be identified for the development and implementation of the...

  14. Space shuttle operations integration plan

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  15. PLANNING FOR INSTRUCTIONAL RESOURCES AT A RAPIDLY GROWING URBAN UNIVERSITY.

    ERIC Educational Resources Information Center

    HANEY, JOHN B.; MCINTYRE, CHARLES J.

    A PROJECT WAS UNDERTAKEN TO DEVELOP A CAMPUS ORGANIZATION RESPONSIBLE FOR INSTRUCTIONAL RESOURCES AND THE DEVELOPMENT OF PLANS FOR IMPLEMENTING THE PROJECT IN TERMS OF THE NECESSARY STAFF, SPACE, FACILITIES, BUDGET, AND ORGANIZATIONAL STRUCTURE. AN EQUALLY IMPORTANT, CONCURRENT TASK WAS TO INVOLVE THE FACULTY IN PLANNING FOR THE USE OF…

  16. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...

  17. Supporting NASA Facilities Through GIS

    NASA Technical Reports Server (NTRS)

    Ingham, Mary E.

    2000-01-01

    The NASA GIS Team supports NASA facilities and partners in the analysis of spatial data. Geographic Information System (G[S) is an integration of computer hardware, software, and personnel linking topographic, demographic, utility, facility, image, and other geo-referenced data. The system provides a graphic interface to relational databases and supports decision making processes such as planning, design, maintenance and repair, and emergency response.

  18. 33 CFR 154.1040 - Specific requirements for facilities that could reasonably be expected to cause substantial harm...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facilities that could reasonably be expected to cause substantial harm to the environment. 154.1040 Section... to the environment. (a) The owner or operator of a facility that, under § 154.1015, could reasonably be expected to cause substantial harm to the environment, shall submit a response plan that meets the...

  19. 33 CFR 154.1040 - Specific requirements for facilities that could reasonably be expected to cause substantial harm...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facilities that could reasonably be expected to cause substantial harm to the environment. 154.1040 Section... to the environment. (a) The owner or operator of a facility that, under § 154.1015, could reasonably be expected to cause substantial harm to the environment, shall submit a response plan that meets the...

  20. 33 CFR 154.1040 - Specific requirements for facilities that could reasonably be expected to cause substantial harm...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facilities that could reasonably be expected to cause substantial harm to the environment. 154.1040 Section... to the environment. (a) The owner or operator of a facility that, under § 154.1015, could reasonably be expected to cause substantial harm to the environment, shall submit a response plan that meets the...

  1. 33 CFR 154.1040 - Specific requirements for facilities that could reasonably be expected to cause substantial harm...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facilities that could reasonably be expected to cause substantial harm to the environment. 154.1040 Section... to the environment. (a) The owner or operator of a facility that, under § 154.1015, could reasonably be expected to cause substantial harm to the environment, shall submit a response plan that meets the...

  2. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  3. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  4. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  5. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  6. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  7. 33 CFR 154.1040 - Specific requirements for facilities that could reasonably be expected to cause substantial harm...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facilities that could reasonably be expected to cause substantial harm to the environment. 154.1040 Section... to the environment. (a) The owner or operator of a facility that, under § 154.1015, could reasonably be expected to cause substantial harm to the environment, shall submit a response plan that meets the...

  8. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  9. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  10. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  11. Local Emergency Planning Committee (LEPC) Data

    EPA Pesticide Factsheets

    The LEPC data set contains over 3000 listings, as of 2008, for name and location data identifying Local Emergency Planning Committees (LEPCs). LEPCs are people responsible to develop an emergency response plan, review it at least annually, and provide information about chemicals in the community to citizens. Plans are developed by LEPCs with stakeholder participation. There is one LEPC for each of the more than 3,000 designated local emergency planning districts. The LEPC membership must include (at a minimum): Elected state and local officials; Police, fire, civil defense, and public health professionals; Environment, transportation, and hospital officials; Facility representatives; Representatives from community groups and the media.

  12. 40 CFR 62.14610 - How do I maintain my operator qualification?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Responses to malfunctions or conditions that may lead to malfunction. (e) Discussion of operating problems...

  13. Design Criteria for Microbiological Facilities at Fort Detrick. Volume I: Introduction.

    ERIC Educational Resources Information Center

    Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div.

    Volume I of a two volume manual serves as an introduction to design criteria for microbiological facilities. It is addressed to management personnel responsible for planning, budgeting, and making policy decisions for construction or remodeling of microbiological research laboratories. This volume is also concerned with--(1) microbiological safety…

  14. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... into a wellhead protection area as defined by the Safe Drinking Water Act of 1986 (SDWA). 1 The...) Water intakes (drinking, cooling, or other); (2) Schools; (3) Medical facilities; (4) Residential areas... discharge; (2) Proximity to downgradient wells, waterways, and drinking water intakes; (3) Proximity to fish...

  15. 42 CFR 1007.11 - Duties and responsibilities of the unit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... patients in health care facilities receiving payments under the State Medicaid plan and may review complaints of the misappropriation of patient's private funds in such facilities. (2) If the initial review... involving the same suspects or allegations. (f) The unit will safeguard the privacy rights of all...

  16. 42 CFR 1007.11 - Duties and responsibilities of the unit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... patients in health care facilities receiving payments under the State Medicaid plan and may review complaints of the misappropriation of patient's private funds in such facilities. (2) If the initial review... involving the same suspects or allegations. (f) The unit will safeguard the privacy rights of all...

  17. 42 CFR 1007.11 - Duties and responsibilities of the unit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... patients in health care facilities receiving payments under the State Medicaid plan and may review complaints of the misappropriation of patient's private funds in such facilities. (2) If the initial review... involving the same suspects or allegations. (f) The unit will safeguard the privacy rights of all...

  18. 42 CFR 1007.11 - Duties and responsibilities of the unit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... patients in health care facilities receiving payments under the State Medicaid plan and may review complaints of the misappropriation of patient's private funds in such facilities. (2) If the initial review... involving the same suspects or allegations. (f) The unit will safeguard the privacy rights of all...

  19. RCRA, Superfund and EPCRA hotline training module. Introduction to: the Superfund response program (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    This module includes the following: Regulatory Summary (Definitions; National Contingency Plan; Notification or Discovery; Response Process; Removal Process; Remedial Process; Community Involvement; State Role; Natural Resource Damage Assessments; Federal Facility Response; and Contractor Support); and Module Summary.

  20. Surface Water Response Modeling

    EPA Science Inventory

    During response to spills, or for facility planning, the vulnerability of downstream water resources is a major concern. How long and at what concentration do spilled contaminants reach downstream receptors? Models have the potential to answer these questions, but only if they ...

  1. 30 CFR 254.42 - Exercises for your response personnel and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Exercises for your response personnel and... COAST LINE Related Requirements for Outer Continental Shelf Facilities § 254.42 Exercises for your response personnel and equipment. (a) You must exercise your entire response plan at least once every 3...

  2. 10 CFR 72.184 - Safeguards contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part..., and Responsibility Matrix, the first four categories of information relating to nuclear facilities licensed under part 50 of this chapter. (The fifth and last category of information, Procedures, does not...

  3. 78 FR 1586 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    .... Additionally, this project would update shipboard marine pollution emergency plans for noxious liquid substance... regulations on vessels carrying oil, oil pollution prevention, oil transfer operations, and rules for marine... No. 318 Marine Transportation- 1625-AA12 Related Facility Response Plans for Hazardous Substances...

  4. Preparedness of elderly long-term care facilities in HSE East for influenza outbreaks.

    PubMed

    O'Connor, L; Boland, M; Murphy, H

    2015-01-01

    Abstract We assessed preparedness of HSE East elderly long-term care facilities for an influenza outbreak, and identified Public Health Department support needs. We surveyed 166 facilities based on the HSE checklist document for influenza outbreaks, with 58% response rate. Client flu vaccination rates were > 75%; leading barriers were client anxiety and consent issues. Target flu vaccine uptake of 40% in staff occurred in 43% of facilities and was associated with staff vaccine administration by afacility-attached GP (p = 0.035), having a facility outbreak plan (p = 0.013) and being anon-HSE run facility (p = 0.013). Leading barriers were staff personal anxiety (94%) and lack of awareness of the protective effect on clients (21%). Eighty-nine percent found Public Health helpful, and requested further educational support and advocacy. Staff vaccine uptake focus, organisational leadership, optimal vaccine provision models, outbreak plans and Public Health support are central to the influenza campaign in elderly long-term care facilities.

  5. Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending December 31, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cash, R.J.; Dukelow, G.T.; Forbes, C.J.

    1993-03-01

    This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285{degrees}C (545{degrees}F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities thatmore » were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed.« less

  6. A Comprehensive Laboratory Animal Facility Pandemic Response Plan

    PubMed Central

    Roble, Gordon S; Lingenhol, Naomi M; Baker, Bryan; Wilkerson, Amy; Tolwani, Ravi J

    2010-01-01

    The potential of a severe influenza pandemic necessitates the development of an organized, rational plan for continued laboratory animal facility operation without compromise of the welfare of animals. A comprehensive laboratory animal program pandemic response plan was integrated into a university-wide plan. Preparation involved input from all levels of organizational hierarchy including the IACUC. Many contingencies and operational scenarios were considered based on the severity and duration of the influenza pandemic. Trigger points for systematic action steps were based on the World Health Organization's phase alert criteria. One extreme scenario requires hibernation of research operations and maintenance of reduced numbers of laboratory animal colonies for a period of up to 6 mo. This plan includes active recruitment and cross-training of volunteers for essential personnel positions, protective measures for employee and family health, logistical arrangements for delivery and storage of food and bedding, the removal of waste, and the potential for euthanasia. Strategies such as encouraging and subsidizing cryopreservation of unique strains were undertaken to protect valuable research assets and intellectual property. Elements of this plan were put into practice after escalation of the pandemic alerts due to influenza A (H1N1) in April 2009. PMID:20858365

  7. National Ignition Facility, High-Energy-Density and Inertial Confinement Fusion, Peer-Review Panel (PRP) Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keane, C. J.

    2014-01-28

    The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is operated as a National Nuclear Security Administration (NNSA) user facility in accordance with Department of Energy (DOE) best practices, including peer-reviewed experiments, regular external reviews of performance, and the use of a management structure that facilitates user and stakeholder feedback. NIF facility time is managed using processes similar to those in other DOE science facilities and is tailored to meet the mix of missions and customers that NIF supports. The NIF Governance Plan describes the process for allocating facility time on NIF and for creating the shot schedule.more » It also includes the flow of responsibility from entity to entity. The plan works to ensure that NIF meets its mission goals using the principles of scientific peer review, including transparency and cooperation among the sponsor, the NIF staff, and the various user communities. The NIF Governance Plan, dated September 28, 2012, was accepted and signed by LLNL Director Parney Albright, NIF Director Ed Moses, and Don Cook and Thomas D’Agostino of NNSA. Figure 1 shows the organizational structure for NIF Governance.« less

  8. 78 FR 57668 - U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Monitoring Activities for the Saltstone Disposal Facility at the Savannah River Site, Revision 1 AGENCY... responsibilities for monitoring DOE's waste disposal activities at the Saltstone Disposal Facility (SDF) at the... Monitoring Disposal Actions Taken by the U.S. Department of Energy at the Savannah River Site Saltstone...

  9. 10 CFR Appendix E to Part 50 - Emergency Planning and Preparedness for Production and Utilization Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... organization shall be described. The communication steps to be taken to alert or activate emergency personnel... operations facility must include the following: (1) Space for members of an NRC site team and Federal, State, and local responders; (2) Additional space for conducting briefings with emergency response personnel...

  10. 10 CFR Appendix E to Part 50 - Emergency Planning and Preparedness for Production and Utilization Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... organization shall be described. The communication steps to be taken to alert or activate emergency personnel... operations facility must include the following: (1) Space for members of an NRC site team and Federal, State, and local responders; (2) Additional space for conducting briefings with emergency response personnel...

  11. 10 CFR Appendix E to Part 50 - Emergency Planning and Preparedness for Production and Utilization Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... organization shall be described. The communication steps to be taken to alert or activate emergency personnel... operations facility must include the following: (1) Space for members of an NRC site team and Federal, State, and local responders; (2) Additional space for conducting briefings with emergency response personnel...

  12. Capital Projects Manual for the Illinois Public Community Colleges.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    This manual is designed primarily for use by those persons at Illinois public community colleges who are responsible for planning and keeping records of college facilities. The Illinois Community College Board (ICCB) is mandated by law to approve the expenditure of state funds for purchase of sites and the construction of facilities and to…

  13. Planning and Designing Today's Career Tech Facility

    ERIC Educational Resources Information Center

    Seaman, James

    2010-01-01

    During the past 20 years, career and technical education (CTE) has gone through significant changes. CTE has evolved in response to the changes technology has had on the job market. Preparing students for high-tech, high-skill job opportunities is the new focus. The facilities that house these programs, however, have not kept pace with these…

  14. 76 FR 61360 - Notice of Intent To Prepare an Environmental Impact Statement for the Foreign Affairs Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ..., simulation labs, and a fitness center; and support facilities such as administrative offices, dormitories, a dining hall, and emergency response facilities. During the initial planning process, GSA conducted a comprehensive site evaluation process that identified and evaluated 41 candidate sites in the vicinity of the...

  15. 77 FR 39938 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... responses are provided below. Comment 1: The Commenter recommended that emission controls for a coal... Dakota. The Commenter stated that initially the coal cleaning facility was identified as BART-eligible... further evaluate controls at the coal cleaning facility and the three EGUs under the reasonable progress...

  16. Exploring approaches to the administration of a long-term care facility: The application of a community planning and development process.

    PubMed

    Caldwell, W J

    1996-01-01

    This article outlines the approaches taken to the management of two long-term care facilities by the County of Huron in southwestern Ontario in 1994. Lay-offs, a move to new facilities, loss of local political confidence, changes in key administrative personnel and low staff morale prompted the county to ask an interim administrative team to develop and implement an appropriate response. The article explains how community development and planning principles and techniques were applied to the management of the homes to achieve an overall improvement in communication, staff morale and attitude. These approaches may prove helpful to other administrations facing major change.

  17. Creating order from chaos: part II: tactical planning for mass casualty and disaster response at definitive care facilities.

    PubMed

    Baker, Michael S

    2007-03-01

    Current events highlight the need for disaster preparedness. We have seen tsunamis, hurricanes, terrorism, and combat in the news every night. There are many variables in a disaster, such as damage to facilities, loss of critical staff members, and overwhelming numbers of casualties. Each medical treatment facility should have a plan for everything from caring for staff members to getting the laundry done and providing enhanced security or mortuary services. Communication and agreements with local, regional, and federal agencies are vital. Then we must train and drill to shape the tools to impose order on chaos and to provide the most care to the greatest number.

  18. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  19. Emergency Response Information for School Facilities

    ERIC Educational Resources Information Center

    National Clearinghouse for Educational Facilities, 2008

    2008-01-01

    Crisis planning includes making preparations for managing school buildings, grounds, occupants, and rescue and recovery personnel during and after a crisis. In "Practical Information on Crisis Planning: A Guide for Schools and Communities, the U.S. Department of Education's Office of Safe and Drug-Free Schools" states: When a crisis…

  20. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  1. Straight talk. New approaches in healthcare. Capital financing: beyond the shores of your typical transaction.

    PubMed

    Bremner, James D; Bielak, Jerry J; Elek, Steven; Wootton, Ian

    2003-11-24

    If you're in the market to renovate or expand but are concerned about overloading your balance sheet with debt or if you plan to build a for-profit facility, consider a Design, Build, Finance, and Operate (DBFO) arrangement. In such deals, experts in finance, construction, real estate, and support-service provision manage risk and day-to-day responsibility for facility management. Evaluating alternatives to tax-exempt financing is a critical piece of capital planning today because competition for traditional sources of funding has become global.

  2. CAMEO Software

    EPA Pesticide Factsheets

    CAMEOfm is a database application where you can keep track of information (such as chemical inventories and contact information for facilities in your community) to assist in emergency response and planning.

  3. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  4. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  5. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  6. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  7. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  8. 33 CFR 154.1240 - Specific requirements for animal fats and vegetable oils facilities that could reasonably be...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environment. 154.1240 Section 154.1240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... oils facilities that could reasonably be expected to cause substantial harm to the environment. (a) The... expected to cause substantial harm to the environment, must submit a response plan that meets the...

  9. 33 CFR 154.1240 - Specific requirements for animal fats and vegetable oils facilities that could reasonably be...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environment. 154.1240 Section 154.1240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... oils facilities that could reasonably be expected to cause substantial harm to the environment. (a) The... expected to cause substantial harm to the environment, must submit a response plan that meets the...

  10. 33 CFR 154.1240 - Specific requirements for animal fats and vegetable oils facilities that could reasonably be...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environment. 154.1240 Section 154.1240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... oils facilities that could reasonably be expected to cause substantial harm to the environment. (a) The... expected to cause substantial harm to the environment, must submit a response plan that meets the...

  11. 33 CFR 154.1240 - Specific requirements for animal fats and vegetable oils facilities that could reasonably be...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environment. 154.1240 Section 154.1240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... oils facilities that could reasonably be expected to cause substantial harm to the environment. (a) The... expected to cause substantial harm to the environment, must submit a response plan that meets the...

  12. 32 CFR 644.137 - Maneuver agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planning and acquires rights to use land and other facilities for Department of the Army exercises. The... and, after the maneuver is completed, will be responsible for negotiating restoration settlements and... director at field level whereby the command will assume responsibility for settlement of real estate...

  13. A Model Schedule for a Capital Improvement Program.

    ERIC Educational Resources Information Center

    Oates, Arnold D.; Burch, A. Lee

    The Model Schedule for a Capital Improvement Program described in this paper encourages school leaders to consider a more holistic view of the planning process. It is intended to assist those responsible for educational facility planning, who must assure that all important and relevant tasks are accomplished in a timely manner. The model's six…

  14. Institutional Controls: A Guide to Planning, Implementing, Maintaining, and Enforcing Institutional Controls at Contaminated Sites

    EPA Pesticide Factsheets

    This guide provides information and recommendations that should be useful for planning, implementing, maintaining, and enforcing institutional controls (ICs) for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, or Superfund); Brownfields; federal facility; underground storage tank (UST); and Resource Conservation and Recovery Act (RCRA) site cleanups.

  15. Planning Educational Facilities for the Next Century.

    ERIC Educational Resources Information Center

    Earthman, Glen I.

    A school building constructed 10 years ago may not be relevant to what is needed in a new building today. Methodology and curriculum change rapidly, and, as a result, buildings change as do the students attending schools today. The administrators in the school system are responsible for adequately planning a new capital-improvement project and…

  16. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1993-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology; and (2) developing general methods and tools for building similar explanation facilities in other domains.

  17. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1994-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology, and (2) developing general methods and tools for building similar explanation facilities in other domains.

  18. Does courtesy bias affect how clients report on objective and subjective measures of family planning service quality? A comparison between facility- and home-based interviews.

    PubMed

    Hameed, Waqas; Ishaque, Muhammad; Gul, Xaher; Siddiqui, Junaid-Ur-Rehman; Hussain, Sharmeen; Hussain, Wajahat; Ahmed, Aftab; Balal, Asma

    2017-01-01

    Despite a general understanding that exit interviews being conducted at service providers' facilities may influence clients' responses favorably to health professionals, there is very little evidence available that demonstrates the extent to which this problem exists. This study aimed at assessing and comparing clients' perceptions of the quality of family planning services and their satisfaction levels between facility- and home-based interviews. A cross-sectional survey was conducted among clients receiving family planning services across three service delivery channels - nongovernmental organization (NGO) clinics, social franchise (SF) centers, and outreach camps. The survey took place from December 2015 to January 2016 in 70 districts across all four provinces of Pakistan. A total of 2,807 clients were interviewed, of whom 1,404 clients were interviewed at health facilities after receiving services and 1,403 were interviewed at their homes within 3 days of method uptake. Overall, we found no significant differences between the characteristics of study participants interviewed at health facilities or at home. The findings suggested that experiences reported in exit surveys at facilities were strongly biased positively. This was true for both experiential (service quality) and perception-based (satisfaction) questions in the context of SF centers, while at NGO clinics the interview location only affected clients' responses regarding service quality. However, in outreach settings, clients are more likely to share bad experiences in exit interviews than in home-based interviews on objectively asked questions (service quality). Our study indicates signs of courtesy bias and possibly the Hawthorne effect in exit interviews. Program implementers could opt for home-based interviews for women receiving services at NGO clinics or SF center, whereas exit interviews could be used in outreach settings.

  19. Does courtesy bias affect how clients report on objective and subjective measures of family planning service quality? A comparison between facility- and home-based interviews

    PubMed Central

    Hameed, Waqas; Ishaque, Muhammad; Gul, Xaher; Siddiqui, Junaid-ur-Rehman; Hussain, Sharmeen; Hussain, Wajahat; Ahmed, Aftab; Balal, Asma

    2017-01-01

    Purpose Despite a general understanding that exit interviews being conducted at service providers’ facilities may influence clients’ responses favorably to health professionals, there is very little evidence available that demonstrates the extent to which this problem exists. This study aimed at assessing and comparing clients’ perceptions of the quality of family planning services and their satisfaction levels between facility- and home-based interviews. Methods A cross-sectional survey was conducted among clients receiving family planning services across three service delivery channels – nongovernmental organization (NGO) clinics, social franchise (SF) centers, and outreach camps. The survey took place from December 2015 to January 2016 in 70 districts across all four provinces of Pakistan. A total of 2,807 clients were interviewed, of whom 1,404 clients were interviewed at health facilities after receiving services and 1,403 were interviewed at their homes within 3 days of method uptake. Results Overall, we found no significant differences between the characteristics of study participants interviewed at health facilities or at home. The findings suggested that experiences reported in exit surveys at facilities were strongly biased positively. This was true for both experiential (service quality) and perception-based (satisfaction) questions in the context of SF centers, while at NGO clinics the interview location only affected clients’ responses regarding service quality. However, in outreach settings, clients are more likely to share bad experiences in exit interviews than in home-based interviews on objectively asked questions (service quality). Conclusion Our study indicates signs of courtesy bias and possibly the Hawthorne effect in exit interviews. Program implementers could opt for home-based interviews for women receiving services at NGO clinics or SF center, whereas exit interviews could be used in outreach settings. PMID:29760573

  20. Progress on plutonium stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurt, D.

    1996-05-01

    The Defense Nuclear Facilities Safety Board has safety oversight responsibility for most of the facilities where unstable forms of plutonium are being processed and packaged for interim storage. The Board has issued recommendations on plutonium stabilization and has has a considerable influence on DOE`s stabilization schedules and priorities. The Board has not made any recommendations on long-term plutonium disposition, although it may get more involved in the future if DOE develops plans to use defense nuclear facilities for disposition activities.

  1. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  2. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  3. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  4. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  5. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Guidelines (see Appendix E to this part, section 13, for availability), which satisfy Oil Pollution Act (OPA... contracts with response contractors shall be included in this section so that the availability of resources...: ___ Direction from City: ___ Section: ____ Township: ____ Range: ____ Borough: ____ Container Type: ___ Tank Oil...

  6. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  7. Cardiovascular emergency preparedness in recreation facilities at major US universities: college fitness center emergency readiness.

    PubMed

    Herbert, William G; Herbert, David L; McInnis, Kyle J; Ribisl, Paul M; Franklin, Barry A; Callahan, Mandy; Hood, Aaron W

    2007-01-01

    Recent American Heart Association/American College of Sports Medicine (AHA/ACSM) guidelines advocate preparticipation screening, planning, and rehearsal for emergencies and automated external defibrillators in all health/fitness facilities. The authors evaluated adherence to these recommendations at 158 recreational service departments in major US universities (51% response rate for 313 institutions queried). Many made their facilities available to unaffiliated residents, with 39% offering programs for those with special medical conditions. Only 18% performed universal preparticipation screening. Twenty-seven percent reported having 1 or more exercise-related instances of cardiac arrest or sudden cardiac death within the past 5 years. Seventy-three percent had an automated external defibrillator, but only 6% reported using it in an emergency. Almost all had written emergency plans, but only 50% posted their plans, and only 27% performed the recommended quarterly emergency drills. The authors' findings suggest low awareness of and adherence to the AHA/ACSM recommendations for identifying individuals at risk for exercise-related cardiovascular complications and for handling such emergencies in university-based fitness facilities. (

  8. Petroleum and hazardous material releases from industrial facilities associated with Hurricane Katrina.

    PubMed

    Santella, Nicholas; Steinberg, Laura J; Sengul, Hatice

    2010-04-01

    Hurricane Katrina struck an area dense with industry, causing numerous releases of petroleum and hazardous materials. This study integrates information from a number of sources to describe the frequency, causes, and effects of these releases in order to inform analysis of risk from future hurricanes. Over 200 onshore releases of hazardous chemicals, petroleum, or natural gas were reported. Storm surge was responsible for the majority of petroleum releases and failure of storage tanks was the most common mechanism of release. Of the smaller number of hazardous chemical releases reported, many were associated with flaring from plant startup, shutdown, or process upset. In areas impacted by storm surge, 10% of the facilities within the Risk Management Plan (RMP) and Toxic Release Inventory (TRI) databases and 28% of SIC 1311 facilities experienced accidental releases. In areas subject only to hurricane strength winds, a lower fraction (1% of RMP and TRI and 10% of SIC 1311 facilities) experienced a release while 1% of all facility types reported a release in areas that experienced tropical storm strength winds. Of industrial facilities surveyed, more experienced indirect disruptions such as displacement of workers, loss of electricity and communication systems, and difficulty acquiring supplies and contractors for operations or reconstruction (55%), than experienced releases. To reduce the risk of hazardous material releases and speed the return to normal operations under these difficult conditions, greater attention should be devoted to risk-based facility design and improved prevention and response planning.

  9. Cabinet decision creating a family planning section in the Ministry of Manpower.

    PubMed

    1989-01-01

    As of April 1, 1989 the Indonesian Ministry of Manpower will contain a family planning section within its regular structure. It will be part of a newly created Sub-directorate for Workers Welfare, which also contains sections for health facilities/services and for nutrition and other welfare services. The family planning section is to be staffed by 8 full-time officials who are responsible for population, family welfare, and family planning programs in the Ministry of Manpower.

  10. X-ray transport and radiation response assessment (XTRRA) experiments at the National Ignition Facility.

    PubMed

    Fournier, K B; Brown, C G; Yeoman, M F; Fisher, J H; Seiler, S W; Hinshelwood, D; Compton, S; Holdener, F R; Kemp, G E; Newlander, C D; Gilliam, R P; Froula, N; Lilly, M; Davis, J F; Lerch, Maj A; Blue, B E

    2016-11-01

    Our team has developed an experimental platform to evaluate the x-ray-generated stress and impulse in materials. Experimental activities include x-ray source development, design of the sample mounting hardware and sensors interfaced to the National Ignition Facility's diagnostics insertion system, and system integration into the facility. This paper focuses on the X-ray Transport and Radiation Response Assessment (XTRRA) test cassettes built for these experiments. The test cassette is designed to position six samples at three predetermined distances from the source, each known to within ±1% accuracy. Built-in calorimeters give in situ measurements of the x-ray environment along the sample lines of sight. The measured accuracy of sample responses as well as planned modifications to the XTRRA cassette is discussed.

  11. Experiments, conceptual design, preliminary cost estimates and schedules for an underground research facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Korbin, G.; Wollenberg, H.; Wilson, C.

    Plans for an underground research facility are presented, incorporating techniques to assess the hydrological and thermomechanical response of a rock mass to the introduction and long-term isolation of radioactive waste, and to assess the effects of excavation on the hydrologic integrity of a repository and its subsequent backfill, plugging, and sealing. The project is designed to utilize existing mine or civil works for access to experimental areas and is estimated to last 8 years at a total cost for contruction and operation of $39.0 million (1981 dollars). Performing the same experiments in an existing underground research facility would reduce themore » duration to 7-1/2 years and cost $27.7 million as a lower-bound estimate. These preliminary plans and estimates should be revised after specific sites are identified which would accommodate the facility.« less

  12. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  13. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  14. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  15. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  16. Liaison Officer Toolkit

    DTIC Science & Technology

    2010-01-01

    Planning Chapters Chapter 5 provides DSCA planning factors for response to all hazard events. Chapter 6 is a review of safety and operational/composite...risk management processes. Chapters 7 through 11 contain the Concepts of Operation (CONOPS) and details five natural hazards /disasters and the...Restoring critical public services and facilities through temporary measures • Identifying hazard mitigation opportunities 3.3.1.5 Rehabilitation

  17. A National Periodicals Center Technical Development Plan.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…

  18. Measuring Stability and Security in Iraq

    DTIC Science & Technology

    2009-11-04

    safer for tourists. Additionally, 24 signed investment licenses totaling $1.122 billion have been directed toward tourism and hospitality industries...the U.S.-Iraq SA, and in accordance with the Presidential guidance articulated February 27, 2009, is the plan being executed for the responsible...conducting detention facility assessments, and inadequate ministerial coordination and planning remain unresolved. In summary, political

  19. S. 986: A Bill to require Federal review and approval of oil discharge contingency plans, and for other purposes. Introduced in the Senate of the United States, One Hundred First Congress, First Session, May 12, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This bill would amend the Federal Water Pollution Control Act to empower the President to determine areas for which a oil or hazardous material discharge contingency plan is necessary and to require terminal operators, vessel operators, and other parties directly involved in the transport of oil or hazardous materials to prepare a contingency plan and to submit this plan for approval to the President on a periodic basis. In the event of a discharge, the President is responsible for seeing that the removal plan is implemented and for requiring any changes as he may determine to be necessary. The Presidentmore » can deny entry to any port to any vessel or deny movement of substances through any terminal facility, if the vessel or facility operators do not have a current and approved contingency plan in effect.« less

  20. Hazardous Waste Certification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance frommore » the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22.« less

  1. Annual report to Congress. Department of Energy activities relating to the Defense Nuclear Facilities Safety Board, calendar year 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2001-03-01

    This Annual Report to the Congress describes the Department of Energy's activities in response to formal recommendations and other interactions with the Defense Nuclear Facilities Safety Board. During 2000, the Department completed its implementation and proposed closure of one Board recommendation and completed all implementation plan milestones associated with two additional Board recommendations. Also in 2000, the Department formally accepted two new Board recommendations and developed implementation plans in response to those recommendations. The Department also made significant progress with a number of broad-based safety initiatives. These include initial implementation of integrated safety management at field sites and within headquartersmore » program offices, issuance of a nuclear safety rule, and continued progress on stabilizing excess nuclear materials to achieve significant risk reduction.« less

  2. Test Plan for the Wake Steering Experiment at the Scaled Wind Farm Technology (SWiFT) Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naughton, Brian Thomas

    This document is a test plan describing the objectives, configuration, procedures, reporting, roles, and responsibilities for conducting the joint Sandia National Laboratories and National Renewable Energy Laboratory Wake Steering Experiment at the Sandia Scaled Wind Farm Technology (SWiFT) facility near Lubbock, Texas in 2016 and 2017 . The purpose of this document is to ensure the test objectives and procedures are sufficiently detailed such that al l involved personnel are able to contribute to the technical success of the test. This document is not intended to address safety explicitly which is addressed in a separate document listed in the referencesmore » titled Sandia SWiFT Facility Site Operations Manual . Both documents should be reviewed by all test personnel.« less

  3. Provision of family planning services in Tanzania: a comparative analysis of public and private facilities.

    PubMed

    Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd

    2012-12-01

    Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.

  4. An Analysis of Medical Imaging Costs in Military Treatment Facilities

    DTIC Science & Technology

    2014-09-01

    authority to completely control the medical systems of each service, the DHA 7 was given management responsibility for specific shared services , functions...efficient health operations through enhanced enterprise-wide shared services . • Deliver more comprehensive primary care and integrated health...of shared services that will fall under central control: • facility planning • medical logistics • health information technology • Tricare health

  5. EPA Concurrence/Approval of Federal Facility Proposed Plans and Records of Decision and other Documents

    EPA Pesticide Factsheets

    The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.

  6. Collaborative Mission Design at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.

    2005-01-01

    NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

  7. Risk Management Plan (RMP) Rule Overview

    EPA Pesticide Factsheets

    As required by Section 112(r) of the Clean Air Act Amendments, this rule contains regulations and guidance for chemical accident prevention at facilities that use extremely hazardous substances, and aids in emergency preparedness and response.

  8. A Teacher Activist's Response to Schools Closing

    ERIC Educational Resources Information Center

    Reed, Sam, III

    2013-01-01

    In this article, the author presents his thoughts, as a teacher activist, on the school closing process in Philadelphia, particularly the effect of the closing process on Beeber Middle School and its response to the closing. The District's Facilities Master Plan originally called for closing 37 schools, Some schools were removed from the closing…

  9. InaSAFE applications in disaster preparedness

    NASA Astrophysics Data System (ADS)

    Pranantyo, Ignatius Ryan; Fadmastuti, Mahardika; Chandra, Fredy

    2015-04-01

    Disaster preparedness activities aim to reduce the impact of disasters by being better prepared to respond when a disaster occurs. In order to better anticipate requirements during a disaster, contingency planning activities can be undertaken prior to a disaster based on a realistic disaster scenario. InaSAFE is a tool that can inform this process. InaSAFE is a free and open source software that estimates the impact to people and infrastructure from potential hazard scenarios. By using InaSAFE, disaster managers can develop scenarios of disaster impacts (people and infrastructures affected) to inform their contingency plan and emergency response operation plan. While InaSAFE provides the software framework exposure data and hazard data are needed as inputs to run this software. Then InaSAFE can be used to forecast the impact of the hazard scenario to the exposure data. InaSAFE outputs include estimates of the number of people, buildings and roads are affected, list of minimum needs (rice and clean water), and response checklist. InaSAFE is developed by Indonesia's National Disaster Management Agency (BNPB) and the Australian Government, through the Australia-Indonesia Facility for Disaster Reduction (AIFDR), in partnership with the World Bank - Global Facility for Disaster Reduction and Recovery (GFDRR). This software has been used in many parts of Indonesia, including Padang, Maumere, Jakarta, and Slamet Mountain for emergency response and contingency planning.

  10. Savannah River Laboratory quality assurance manual. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-02-01

    The SRL quality assurance program is a management activity that verifies that the results of our research and development are adequate for their intended use and that our facilities function properly. The program is based on Savannah River Quality Assurance Plan (DPW-82-111-2, Rev 0) as applied through Quality Assurance Procedures and Divisional Plans (following section). The AED policy states that ''all activities shall be conducted to achieve a high quality of product and performance...'' The policy contains 18 considerations to be applied ''proportional to needs, based on the technical and professional judgment of responsible Du Pont employees.'' Quality is themore » responsibility of each individual and his line organization, as is safety. To ensure that quality is being considered for all SRL activities, all research programs are reviewed, and all facilities are assessed. These assessments and reviews are the nucleus of the Quality Assurance program.« less

  11. How to HAMMER home hazardous materials training

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ollero, J.

    1994-10-01

    This article describes HAMMER - the Hazardous Materials Management and Emergency Response Training - program being developed at the Hanford Reservation. The program uses true-to-life props and facilities to simulate emergencies and hazardous conditions. Topics covered include the set-up of the facility and training; the demand for such training; the involvement of the Army Corps of Engineers; the props to be constructed; the educational involvement of Tulane and Xavier Univerisities of Louisiana; temporary facility for the program; partnership with Indian Nations and Stakeholders; and budget plans and constriction. 9 figs.

  12. EPA Facility Registry Service (FRS): OIL

    EPA Pesticide Factsheets

    This dataset contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Oil database. The Oil database contains information on Spill Prevention, Control, and Countermeasure (SPCC) and Facility Response Plan (FRP) subject facilities to prevent and respond to oil spills. FRP facilities are referred to as substantial harm facilities due to the quantities of oil stored and facility characteristics. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to Oil facilities once the Oil data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.

  13. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  14. 33 CFR 154.1228 - Methods of ensuring the availability of response resources by contract or other approved means.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities... following methods: (1) The identification of an oil spill removal organization with specified equipment and... personnel, equipment, and services capable of being provided by the oil spill removal organization within...

  15. 33 CFR 154.1228 - Methods of ensuring the availability of response resources by contract or other approved means.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities... following methods: (1) The identification of an oil spill removal organization with specified equipment and... personnel, equipment, and services capable of being provided by the oil spill removal organization within...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may bemore » authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.« less

  17. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  18. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  19. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  20. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  1. Environmental Geographic Information Systems (EGIS) at Stennis Space Center (SSC)

    NASA Technical Reports Server (NTRS)

    Carr, Hugh; Smoot, James; Parikh, Joy

    2004-01-01

    This viewgraph presentation includes: 1) Background of SSC Environmental GIS (EGIS); 2) Principal Center Activities; 3) SSC's GIS Applications: a) Environmental Emergency Response Tool, b) CERCLA, c) Facilities Master Planning, d) Natural Resource Management and Site Assessment.

  2. 24 CFR 51.102 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... areas and advise local officials, developers, and planning groups of the unacceptability of sites... the suitability of the acoustical environment of proposed projects; (2) Notify applicants of any... acceptability standards in commenting on the prospective impacts of transportation facilities and other noise...

  3. 24 CFR 51.102 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... areas and advise local officials, developers, and planning groups of the unacceptability of sites... the suitability of the acoustical environment of proposed projects; (2) Notify applicants of any... acceptability standards in commenting on the prospective impacts of transportation facilities and other noise...

  4. 39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...

  5. 39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...

  6. 39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...

  7. 39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...

  8. 39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...

  9. 24 CFR 586.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES REVITALIZING BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT... Response, Compensation, and Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the...

  10. Planning and Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.

    Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…

  11. Stick with a School Maintenance Plan

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2012-01-01

    The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in…

  12. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  13. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  14. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  15. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  16. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  17. Guidelines for Planning in Colleges and Universities. Volume 4: Physical Plant Planning, Facilities Studies.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…

  18. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  19. Annual report to Congress: Department of Energy activities relating to the Defense Nuclear Facilities Safety Board, calendar year 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-02-01

    This is the ninth Annual Report to the Congress describing Department of Energy (Department) activities in response to formal recommendations and other interactions with the Defense Nuclear Facilities Safety Board (Board). The Board, an independent executive-branch agency established in 1988, provides advice and recommendations to the Secretary of energy regarding public health and safety issues at the Department`s defense nuclear facilities. The Board also reviews and evaluates the content and implementation of health and safety standards, as well as other requirements, relating to the design, construction, operation, and decommissioning of the Department`s defense nuclear facilities. The locations of the majormore » Department facilities are provided. During 1998, Departmental activities resulted in the proposed closure of one Board recommendation. In addition, the Department has completed all implementation plan milestones associated with four other Board recommendations. Two new Board recommendations were received and accepted by the Department in 1998, and two new implementation plans are being developed to address these recommendations. The Department has also made significant progress with a number of broad-based initiatives to improve safety. These include expanded implementation of integrated safety management at field sites, a renewed effort to increase the technical capabilities of the federal workforce, and a revised plan for stabilizing excess nuclear materials to achieve significant risk reduction.« less

  20. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less

  1. ERCMExpress. Volume 2, Issue 2

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" introduces the National Clearinghouse for Educational Facilities (NCEF), a free public service that provides information on planning, designing, funding, building, improving and maintaining safe, healthy, high-performance schools. NCEF is…

  2. FAA Energy Order 1053.1A - Energy and Water Management Program For FAA Buildings and Facilities

    DOT National Transportation Integrated Search

    1996-12-27

    This order provides Federal Aviation Administration (FAA) policies, procedures, and organizational responsibilities, in a focused and expanded agency energy and water planning and conservation program, for complying with the national mandates for the...

  3. 40 CFR 264.54 - Amendment of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency...

  4. 40 CFR 264.54 - Amendment of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency...

  5. Guidelines for Analysis of Health Facilities Planning in Developing Countries. Volume 5: Health Facilities Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Porter, Dennis R.; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this fifth of ten manuals in the International Health Planning Methods Series deals with health facilities planning in developing countries. While several specific…

  6. Prepared to react? Assessing the functional capacity of the primary health care system in rural Orissa, India to respond to the devastating flood of September 2008.

    PubMed

    Phalkey, Revati; Dash, Shisir R; Mukhopadhyay, Alok; Runge-Ranzinger, Silvia; Marx, Michael

    2012-01-01

    Early detection of an impending flood and the availability of countermeasures to deal with it can significantly reduce its health impacts. In developing countries like India, public primary health care facilities are frontline organizations that deal with disasters particularly in rural settings. For developing robust counter reacting systems evaluating preparedness capacities within existing systems becomes necessary. The objective of the study is to assess the functional capacity of the primary health care system in Jagatsinghpur district of rural Orissa in India to respond to the devastating flood of September 2008. An onsite survey was conducted in all 29 primary and secondary facilities in five rural blocks (administrative units) of Jagatsinghpur district in Orissa state. A pre-tested structured questionnaire was administered face to face in the facilities. The data was entered, processed and analyzed using STATA(®) 10. Data from our primary survey clearly shows that the healthcare facilities are ill prepared to handle the flood despite being faced by them annually. Basic utilities like electricity backup and essential medical supplies are lacking during floods. Lack of human resources along with missing standard operating procedures; pre-identified communication and incident command systems; effective leadership; and weak financial structures are the main hindering factors in mounting an adequate response to the floods. The 2008 flood challenged the primary curative and preventive health care services in Jagatsinghpur. Simple steps like developing facility specific preparedness plans which detail out standard operating procedures during floods and identify clear lines of command will go a long way in strengthening the response to future floods. Performance critiques provided by the grass roots workers, like this one, should be used for institutional learning and effective preparedness planning. Additionally each facility should maintain contingency funds for emergency response along with local vendor agreements to ensure stock supplies during floods. The facilities should ensure that baseline public health standards for health care delivery identified by the Government are met in non-flood periods in order to improve the response during floods. Building strong public primary health care systems is a development challenge. The recovery phases of disasters should be seen as an opportunity to expand and improve services and facilities.

  7. Prepared to react? Assessing the functional capacity of the primary health care system in rural Orissa, India to respond to the devastating flood of September 2008

    PubMed Central

    Phalkey, Revati; Dash, Shisir R.; Mukhopadhyay, Alok; Runge-Ranzinger, Silvia; Marx, Michael

    2012-01-01

    Background Early detection of an impending flood and the availability of countermeasures to deal with it can significantly reduce its health impacts. In developing countries like India, public primary health care facilities are frontline organizations that deal with disasters particularly in rural settings. For developing robust counter reacting systems evaluating preparedness capacities within existing systems becomes necessary. Objective The objective of the study is to assess the functional capacity of the primary health care system in Jagatsinghpur district of rural Orissa in India to respond to the devastating flood of September 2008. Methods An onsite survey was conducted in all 29 primary and secondary facilities in five rural blocks (administrative units) of Jagatsinghpur district in Orissa state. A pre-tested structured questionnaire was administered face to face in the facilities. The data was entered, processed and analyzed using STATA® 10. Results Data from our primary survey clearly shows that the healthcare facilities are ill prepared to handle the flood despite being faced by them annually. Basic utilities like electricity backup and essential medical supplies are lacking during floods. Lack of human resources along with missing standard operating procedures; pre-identified communication and incident command systems; effective leadership; and weak financial structures are the main hindering factors in mounting an adequate response to the floods. Conclusion The 2008 flood challenged the primary curative and preventive health care services in Jagatsinghpur. Simple steps like developing facility specific preparedness plans which detail out standard operating procedures during floods and identify clear lines of command will go a long way in strengthening the response to future floods. Performance critiques provided by the grass roots workers, like this one, should be used for institutional learning and effective preparedness planning. Additionally each facility should maintain contingency funds for emergency response along with local vendor agreements to ensure stock supplies during floods. The facilities should ensure that baseline public health standards for health care delivery identified by the Government are met in non-flood periods in order to improve the response during floods. Building strong public primary health care systems is a development challenge. The recovery phases of disasters should be seen as an opportunity to expand and improve services and facilities. PMID:22435044

  8. Building a secondary containment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Broder, M.F.

    1994-10-01

    Retail fertilizer and pesticide dealers across the United States are installing secondary containment at their facilities or are seriously considering it. Much of this work is in response to new state regulations; however, many dealers not facing new regulations are upgrading their facilities to reduce their liability, lower their insurance costs, or comply with anticipated regulations. The Tennessee Valley Authority`s (TVA) National Fertilizer and Environmental Research Center (NFERC) has assisted dealers in 22 states in retrofitting containment to their facilities. Simultaneous improvements in the operational efficiency of the facilities have been achieved at many of the sites. This paper ismore » based on experience gained in that work and details the rationale used in planning secondary containment and facility modifications.« less

  9. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jannik, G.T.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less

  10. Family planning utilization and factors associated among women receiving abortion services in health facilities of central zone towns of Tigray, Northern Ethiopia: a cross sectional Study.

    PubMed

    Hagos, Goshu; Tura, Gurmesa; Kahsay, Gizienesh; Haile, Kebede; Grum, Teklit; Araya, Tsige

    2018-06-05

    Abortion remains among the leading causes of maternal death worldwide. Post-abortion contraception is significantly effective in preventing unintended pregnancy and abortion if provided before women leave the health facilty. However, the status of post-abortion family planning (PAFP) utilization and the contributing factors are not well studied in Tigray region. So, we conduct study aimed on family planning utilization and factors associated with it among women receiving abortion services. A facility based cross-sectional study design was conducted among women receiving abortion services in central zone of Tigray from December 2015to February 2016 using a total of 416 sample size. Women who came for abortion services were selected using systematic random sampling technique.. The data were collected using a pre-tested interviewer administered questionnair. Data were coded and entered in to Epi info 7 and then exported to SPSS for analysis. Descriptive statisticslike frequencies and mean were computed to display the results. Both Bivariable and multivariable logistic regression was used in the analysis. Variables statistically significant at p < 0.05 in the bivariable analysis were checked in multivariable logistic regration to identify independently associated factors. Then variables which were significantly associated with post abortion family planning utilization at p-value < 0.05 in the multivariable analysis were declared as significantly associated factors. A total of 409 abortion clients were interviewed in this study with 98.3% of response rate. Majority 290 (70.9%) of study participants utilized contracepives after abortion. Type of health facility, the decision maker on timing of having child, knowledge that pregnancy can happen soon after abortion and husband's opposition towards contraceptives were significantly associated with Post-abortion family planning ustilization. About one-third of abortion women failed to receive contraceptive before leaving the facility. Private facilities should strengthen utilization of contraceptives on post abortion care service. Health providers should provide counseling on timing of fertility-return following abortion before women left the facility once they receive abortion care. Women empowerment through enhancing community's awareness focusing on own decision making in the family planning utilization including the partner should be strengthened.

  11. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  12. 40 CFR 300.410 - Removal site evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY... preliminary assessment of releases from hazardous waste management facilities may include collection or review... for the release, or any other person, is providing appropriate response, and on-scene monitoring by...

  13. 40 CFR 300.410 - Removal site evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY... preliminary assessment of releases from hazardous waste management facilities may include collection or review... for the release, or any other person, is providing appropriate response, and on-scene monitoring by...

  14. 40 CFR 300.410 - Removal site evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY... preliminary assessment of releases from hazardous waste management facilities may include collection or review... for the release, or any other person, is providing appropriate response, and on-scene monitoring by...

  15. 40 CFR 35.2105 - Debarment and suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... unit of government for facilities planning or design work whose name appears on the master list of... applicant should be found non-responsible under part 30 of this subchapter or be the subject of possible debarment or suspension under part 32 of this subchapter. ...

  16. Site maps and facilities listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less

  17. Arms Control and Nonproliferation: A Catalog of Treaties and Agreements

    DTIC Science & Technology

    2010-02-02

    Russia, partly in response to U.S. plans to deploy a missile defense radar in the Czech Republic and interceptor missiles in Poland, stated that it...10 interceptors based in Poland and a radar in the Czech Republic . Russia’s former President Putin and his successor, Vladimir Medvedev, argued that...States reversed its plan to emplace GMD facilities in Poland and the Czech Republic . Congress resisted the Bush Administration’s request for funding

  18. Information Facilities. First Year Report on Contract NIRT 1, Assistance in Telecommunications Planning. Volume 4, Communication Satellite Planning Center, Technical Report No. 2.

    ERIC Educational Resources Information Center

    Lusignan, Bruce B.

    In response to a request by the National Iranian Radio and Television (NIRT), a study was conducted to see what types of film and video archives presently exist. Archives can be classified into three types: (1) production archives used as resources in the making of other films and tapes, (2) film studio archives used to store prints for future…

  19. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  20. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael George

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liabilitymore » Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.« less

  1. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  2. Consider long-term care as service alternative.

    PubMed

    Loria, L S

    1987-04-01

    The increasing demand for elderly care services, pressures on inpatient average length of stay and payment levels, and potential financial rewards from providing additional services, makes long-term care look attractive to hospitals. Long-term care, however, is not for every hospital. Before deciding to establish long-term care services, management should examine how the service fits within the hospital's strategic plan. The action plan below provides guidance in evaluating a decision to use hospital facilities for long-term care. Examine how long-term care services fit within the hospital's strategic plan. Study area demographics and competitors to assess the need and supply of long-term care services. Survey the medical staff, consumers and payers to determine attitudes, perceptions and interests regarding long-term care services. Develop a facility plan that identifies areas of excess capacity that can be most easily converted into long-term care with minimal effects on hospital operations. Prepare a financial feasibility analysis of the contribution margin and return on investment attributable to long-term care services. Include an impact analysis on hospital operations. Establish a management task force to develop a detailed implementation plan including assigned individual responsibilities and related timetable. Develop an effective marketing plan designed to generate increased patient market share.

  3. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  4. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  5. Inspired Planning

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2009-01-01

    Long-range facility planning is a comprehensive process for preparing education institutions for the future and confirm that facilities meet current needs. A long-range facilities plan (LRFP) evaluates how facilities support programs and the educational needs of students, staff and the community. Each school district or college has unique needs…

  6. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  7. 25 CFR 170.442 - What is the IRR Inventory?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory..., maintenance responsibility, and ownership. (b) Elements of the inventory are used in the Relative Need...

  8. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  9. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  10. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  11. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  12. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  13. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  14. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  15. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  16. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  17. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  18. River Protection Project (RPP) Dangerous Waste Training Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POHTO, R.E.

    2000-03-09

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Titlemore » 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.« less

  19. Getting Down to Business: An Action Plan for Public-Private Disaster Response Coordination. The Report of the Business Response Task Force

    DTIC Science & Technology

    2007-01-01

    gency Management Association ( NEMA ) to explore application of the Emergency Management Assistance Compact (EMAC) model to the task of identifying...organizations combined—are the norm . The challenge for government and the private sector is to ensure that donated goods and services from the latter...Association ( NEMA ). EOC – Emergency Operations Center – the central command and control facility responsible for carrying out emergency preparedness and

  20. United States Department of Energy Environmental Restoration and Waste Management: Comment Response Document. Five-Year Plan, Fiscal Years 1993--1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department`s mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE`s new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department`s commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM`s efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE`s commitment to the culture change by involving the general public in its development.« less

  1. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  2. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  3. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  4. Technology requirements to be addressed by the NASA Lewis Research Center Cryogenic Fluid Management Facility program

    NASA Technical Reports Server (NTRS)

    Aydelott, J. C.; Rudland, R. S.

    1985-01-01

    The NASA Lewis Research Center is responsible for the planning and execution of a scientific program which will provide advance in space cryogenic fluid management technology. A number of future space missions were identified that require or could benefit from this technology. These fluid management technology needs were prioritized and a shuttle attached reuseable test bed, the cryogenic fluid management facility (CFMF), is being designed to provide the experimental data necessary for the technology development effort.

  5. Insight into implementation of facility-based integrated management of childhood illness strategy in a rural district of Sindh, Pakistan.

    PubMed

    Pradhan, Nousheen Akber; Rizvi, Narjis; Sami, Neelofar; Gul, Xaher

    2013-07-05

    Integrated management of childhood illnesses (IMCI) strategy has been proven to improve health outcomes in children under 5 years of age. Pakistan, despite being in the late implementation phase of the strategy, continues to report high under-five mortality due to pneumonia, diarrhea, measles, and malnutrition - the main targets of the strategy. The study determines the factors influencing IMCI implementation at public-sector primary health care (PHC) facilities in Matiari district, Sindh, Pakistan. An exploratory qualitative study with an embedded quantitative strand was conducted. The qualitative part included 16 in-depth interviews (IDIs) with stakeholders which included planners and policy makers at a provincial level (n=5), implementers and managers at a district level (n=3), and IMCI-trained physicians posted at PHC facilities (n=8). Quantitative part included PHC facility survey (n=16) utilizing WHO health facility assessment tool to assess availability of IMCI essential drugs, supplies, and equipments. Qualitative content analysis was used to interpret the textual information, whereas descriptive frequencies were calculated for health facility survey data. The major factors reported to enhance IMCI implementation were knowledge and perception about the strategy and need for separate clinic for children aged under 5 years as potential support factors. The latter can facilitate in strategy implementation through allocated workforce and required equipments and supplies. Constraint factors mainly included lack of clear understanding of the strategy, poor planning for IMCI implementation, ambiguity in defined roles and responsibilities among stakeholders, and insufficient essential supplies and drugs at PHC centers. The latter was further substantiated through health facilities' survey findings, which indicated that none of the facilities had 100% stock of essential supplies and drugs. Only one out of all 16 surveyed facilities had 75% of the total supplies, while 4 out of 16 facilities had 56% of the required IMCI drug stock. The mean availability of supplies ranged from 36.6 to 66%, while the mean availability of drugs ranged from 45.8 to 56.7%. Our findings indicate that the Matiari district has sound implementation potential; however, bottlenecks at health care facility and at health care management level have badly constrained the implementation process. An interdependency exists among the constraining factors, such as lack of sound planning resulting in unclear understanding of the strategy; leading to ambiguous roles and responsibilities among stakeholders which manifest as inadequate availability of supplies and drugs at PHC facilities. Addressing these barriers is likely to have a cumulative effect on facilitating IMCI implementation. On the basis of these findings, we recommend that the provincial Ministry of Health (MoH) and provincial Maternal Neonatal and Child Health (MNCH) program jointly assess the situation and streamline IMCI implementation in the district through sound planning, training, supervision, and logistic support.

  6. Design and evaluation of a disaster preparedness logistics tool.

    PubMed

    Neches, Robert; Ryutov, Tatyana; Kichkaylo, Tatiana; Burke, Rita V; Claudius, Ilene A; Upperman, Jeffrey S

    2009-01-01

    The purpose of this article is to describe the development and testing of the Pediatric Emergency Decision Support System (PEDSS), a dynamic tool for pediatric victim disaster planning. This is a descriptive article outlining an innovative automated approach to pediatric decision support and disaster planning. Disaster Resource Centers and umbrella hospitals in Los Angeles County. The authors use a model set of hypothetical patients for our pediatric disaster planning approach. The authors developed the PEDSS software to accomplish two goals: (a) core that supports user interaction and data management requirements (e.g., accessing demographic information about a healthcare facility's catchment area) and (b) set of modules each addressing a critical disaster preparation issue. The authors believe the PEDSS tool will help hospital disaster response personnel produce and maintain disaster response plans that apply best practice pediatric recommendations to their particular local conditions and requirements.

  7. 33 CFR 154.1055 - Exercises.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Exercises. 154.1055 Section 154... Exercises. (a) A response plan submitted by an owner or operator of an MTR facility must include an exercise program containing both announced and unannounced exercises. The following are the minimum exercise...

  8. 33 CFR 154.1055 - Exercises.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Exercises. 154.1055 Section 154... Exercises. (a) A response plan submitted by an owner or operator of an MTR facility must include an exercise program containing both announced and unannounced exercises. The following are the minimum exercise...

  9. 33 CFR 154.1055 - Exercises.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Exercises. 154.1055 Section 154... Exercises. (a) A response plan submitted by an owner or operator of an MTR facility must include an exercise program containing both announced and unannounced exercises. The following are the minimum exercise...

  10. 33 CFR 154.1055 - Exercises.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Exercises. 154.1055 Section 154... Exercises. (a) A response plan submitted by an owner or operator of an MTR facility must include an exercise program containing both announced and unannounced exercises. The following are the minimum exercise...

  11. 30 CFR 285.105 - What are my responsibilities under this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...? 285.105 Section 285.105 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE... including marine trash and debris into the offshore environment. (b) Submit requests, applications, plans...

  12. 76 FR 40916 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... study is two- fold: (1) To examine healthcare facility compliance with the New Jersey Violence..., written violence prevention plan, violence risk assessments, post incident response and violence... years pre- regulation (2009-2011) and 3 years post-regulation (2012-2014). The purpose of collecting...

  13. Federal guide for a radiological response: Supporting the Nuclear Regulatory Commission during the initial hours of a serious accident

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, R.T.

    1993-11-01

    This document is a planning guide for those Federal agencies that work with the Nuclear Regulatory commission (NRC) during the initial hours of response to a serious radiological emergency in which the NRC is the Lead Federal Agency (LFA). These Federal agencies are: DOE, EPA, USDA, HHS, NOAA, and FEMA. This guide is intended to help these agencies prepare for a prompt response. Instructions are provided on receiving the initial notification, the type of person to send to the scene, the facility at which people are needed, how to get them to that facility, and what they should do whenmore » they arrive. Federal agencies not specifically mentioned in this guide may also be asked to support the NRC.« less

  14. A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    PEERY, A.B.

    A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…

  15. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  16. 40 CFR 62.5100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Plan for Control... plan. (a) Identification of plan. Maryland Plan for Control Designated Pollutants from Existing Facilities (Section 111(d) plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric...

  17. 40 CFR 62.10100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...

  18. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  19. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  20. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  1. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  2. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  3. Special population planner 4 : an open source release.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, J.; Metz, W.; Tanzman, E.

    2008-01-01

    Emergencies like Hurricane Katrina and the recent California wildfires underscore the critical need to meet the complex challenge of planning for individuals with special needs and for institutionalized special populations. People with special needs and special populations often have difficulty responding to emergencies or taking protective actions, and emergency responders may be unaware of their existence and situations during a crisis. Special Population Planner (SPP) is an ArcGIS-based emergency planning system released as an open source product. SPP provides for easy production of maps, reports, and analyses to develop and revise emergency response plans. It includes tools to manage amore » voluntary registry of data for people with special needs, integrated links to plans and documents, tools for response planning and analysis, preformatted reports and maps, and data on locations of special populations, facility and resource characteristics, and contacts. The system can be readily adapted for new settings without programming and is broadly applicable. Full documentation and a demonstration database are included in the release.« less

  4. 40 CFR 62.8350 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Carolina Plan for... Identification of plan. (a) Identification of plan. North Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric acid mist emissions from...

  5. Planning for Future Forms of Education: Towards an Educational and Educational Facilities Planning Model.

    ERIC Educational Resources Information Center

    Leu, Donald J.

    The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…

  6. Water safety in healthcare facilities. The Vieste Charter.

    PubMed

    Bonadonna, L; Cannarozzi de Grazia, M; Capolongo, S; Casini, B; Cristina, M L; Daniele, G; D'Alessandro, D; De Giglio, O; Di Benedetto, A; Di Vittorio, G; Ferretti, E; Frascolla, B; La Rosa, G; La Sala, L; Lopuzzo, M G; Lucentini, L; Montagna, M T; Moscato, U; Pasquarella, C; Prencipe, R; Ricci, M L; Romano Spica, V; Signorelli, C; Veschetti, E

    2017-01-01

    The Study Group on Hospital Hygiene of the Italian Society of Hygiene, Preventive Medicine and Public Health (GISIO-SItI) and the Local Health Authority of Foggia, Apulia, Italy, after the National Convention "Safe water in healthcare facilities" held in Vieste-Pugnochiuso on 27-28 May 2016, present the "Vieste Charter", drawn up in collaboration with experts from the National Institute of Health and the Ministry of Health. This paper considers the risk factors that may affect the water safety in healthcare facilities and reports the current regulatory frameworks governing the management of installations and the quality of the water. The Authors promote a careful analysis of the risks that characterize the health facilities, for the control of which specific actions are recommended in various areas, including water safety plans; approval of treatments; healthcare facilities responsibility, installation and maintenance of facilities; multidisciplinary approach; education and research; regional and national coordination; communication.

  7. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  8. Planning for Campus Safety

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2009-01-01

    From natural disasters to criminal violence, facilities officers are often called on to address campus safety and security issues beyond their usual responsibilities. Their experiences in coping with unanticipated events have produced a catalogue of lessons learned that can help them and their peers at other institutions who might face the same…

  9. School Building Construction and Inspection Resource Manual. Revision 1.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This manual contains current legal requirements and information on school building construction and inspection in the state of Utah. Major topics include facilities long-range planning; the role and responsibilities of the School District Building Official; school site issues such as size and location, impact, and acquisition and development; as…

  10. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  11. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  12. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  13. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  14. Edward W. Jennings | NREL

    Science.gov Websites

    practices promoting a safe and supportive working environment. His research interests include environmental, safety, and health (ESH) and facility issues, he is responsible for implementing safe work plan; working directly with awardees by performing on-site validations to collect and analyze enzyme

  15. 40 CFR 267.54 - When must I amend the contingency plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A... for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency. (d) You change the list of emergency coordinators. (e) You change the...

  16. 40 CFR 267.54 - When must I amend the contingency plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A... for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency. (d) You change the list of emergency coordinators. (e) You change the...

  17. Problem Seeking. New Directions in Architectural Programming.

    ERIC Educational Resources Information Center

    Pena, William M.; Focke, John W.

    The rationale, principles, and methods of pre-design architectural programing are explained for those responsible for overall policy decision-making in the area of facility planning. This programing process provides an orderly framework that aids the architect in defining a client's total problem. A general background is given on data collection,…

  18. Community College of Rhode Island: Annual Report, 1998.

    ERIC Educational Resources Information Center

    Abood, Nancy V.; LeBlanc, William

    This 1998 annual report describes the college's plans for building facilities for the future and its infrastructure improvements. The document looks at the college's response to building programs of study that will meet the community's needs, and describes partnerships formed with high schools, colleges and universities, non-profit organizations,…

  19. Special population planner, version 4.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuiper, J.; Tanzman, E.; Metz, W.

    2007-03-26

    Emergencies happen every day. Many are caused by storms or auto accidents and can be planned for, if not predicted. Emergencies resulting from natural hazards often affect a large number of people, and planning for them can be difficult, since knowledge of the needs of the people involved is generally unavailable. Emergencies resulting from accidents at industrial and military facilities can also be large scale in nature if people must be evacuated or sheltered in place. Federal planning for large scale emergencies is the responsibility of the Federal Emergency Management Agency (FEMA), which provides assistance to various emergency management agenciesmore » at the national, state and local level. More information about FEMA is available at http://www.fema.gov/. The purpose of the Special Population Planner (SPP) is to help emergency planners address the needs of persons with special needs. The exact definition of 'special population' is a policy decision. Policymakers have included a variety of groups in this term, such as persons with disabilities, those who do not have vehicles with which to evacuate, children who are unattended at times (latchkey children), and many others. The SPP was developed initially for the Alabama Emergency Management Agency as part of its Chemical Stockpile Emergency Preparedness Program (CSEPP), which aids emergency planning and preparedness in communities surrounding military installations across the United States where chemical weapons are stored pending their destruction under federal law. Like that specialized application, this open-source version contains a set of specialized Geographic Information System (GIS) tools to facilitate emergency planning on behalf of persons with special needs, regardless of how the term is defined. While the original SPP system was developed for emergency planning relating to chemical hazards, it can be applied to other threats as well. It is apparent from Hurricane Katrina and other natural and man-made disasters that many of the problems posed by emergency planning for a chemical weapons agent release are shared by other hazards as well. The notion that emergency planning shares common functions underlies the decision by FEMA to include the Chemical Stockpile Emergency Preparedness Program (CSEPP) in its 'all-hazards' planning approach. The CSEPP's official planning guidance operationalizes this approach by suggesting that state and local CSEPP emergency plans 'should be appended to the existing all-hazards emergency plan.' The SPP is programmed as a set of tools within an ESRI ArcMap 9.1 project. ArcMap is a component of both ESRI ArcGIS 9.1 and ESRI ArcView 9.1, and it provides a rich GIS user interface for viewing spatial and tabular data, analyzing it, and producing output reports and maps. This GIS interface has been augmented with the SPP tools for a user interface that provides custom functionality for emergency planning. The system as released also includes some hypothetical example records for special needs populations, facilities, resources, control points and sirens sufficient for showing how the system would work with real information. A GIS database is included with some publicly available example layers. The SPP is designed to support emergency planners as they address emergency management issues, and includes capabilities that support the collection and importing of data, the review of data in a spatial context, and GIS tools for emergency planning. The SPP system allows for the identification and categorization of response zones to allow for multiple levels of preparedness. An Immediate Response Zone (IRZ) might be designated as the area 0 to 10 miles from a facility where the response would be the most urgent. SPP can support more than one set of planning zones to accommodate different types of emergencies or the different jurisdictions of emergency response organizations. These areas can be delineated by any number of criteria that make sense for the area. An area like New Orleans might designate response zones based on the depth above/below sea level, or an urban area may categorize an IRZ as the 'central business district' with the PAZ encompassing the larger outlying area. Many of the sites involved in the CSEPP currently use an integrated emergency response information system to support their emergency management planning. The D2-Puff system (including or WebPuff 2.1) by Innovative Emergency Management, Inc. is the main software serving this purpose. More information on D2-Puff can be found at www.ieminc.com. SPP differs from D2-Puff in that it is designed for planning, not response to assist those with special needs, is programmed within a popular commercial GIS software system, and can be loaded with large amounts of data to support all hazards emergency planning.« less

  20. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  1. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

  2. NASA ATP Force Measurement Technology Capability Strategic Plan

    NASA Technical Reports Server (NTRS)

    Rhew, Ray D.

    2008-01-01

    The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.

  3. Bioterrorism and mass casualty preparedness in hospitals: United States, 2003.

    PubMed

    Niska, Richard W; Burt, Catharine W

    2005-09-27

    This study examined the content of hospital terrorism preparedness emergency response plans; whether those plans had been updated since September 11, 2001; collaboration of hospitals with outside organizations; clinician training in the management of biological, chemical, explosive, and nuclear exposures; drills on the response plans; and equipment and bed capacity. The National Hospital Ambulatory Medical Care Survey (NHAMCS) is an annual survey of a probability sample of approximately 500 non-Federal general and short-stay hospitals in the United States. A Bioterrorism and Mass Casualty Supplement was included in the 2003 survey and provided the data for this analysis. Almost all hospitals have plans for responding to natural disasters (97.3 percent). Most have plans for responding to chemical (85.5 percent), biological (84.8 percent), nuclear or radiological (77.2 percent), and explosive incidents (76.9 percent). About three-quarters of hospitals were integrated into community-wide disaster plans (76.4 percent), and 75.9 percent specifically reported a cooperative planning process with other local health care facilities. Despite these plans, only 46.1 percent reported written memoranda of understanding with these facilities to accept inpatients during a declared disaster. Hospitals varied widely in their plans for re-arranging schedules and space in the event of a disaster. Training for hospital incident command and smallpox, anthrax, chemical, and radiological exposures was ahead of training for other infectious diseases. The percentage of hospitals training their staff in any exposure varied from 92.1 percent for nurses to 49.2 percent for medical residents. Drills for natural disasters occurred more often than those for chemical, biological, explosive, nuclear, and epidemic incidents. More hospitals staged drills for biological attacks than for severe epidemics. Despite explosions being the most common form of terrorism, drills for these were staged by only one-fifth of hospitals. Hospitals collaborated on drills most often with emergency medical services, fire departments, and law enforcement agencies.

  4. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  5. Developing State Agency Facility Plans: A Guide to Planning and Implementation. Michigan Studies in Rehabilitation Utilization Series: 4.

    ERIC Educational Resources Information Center

    Miller, Juliet V.; Wargel, James F.

    Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…

  6. Facilities Utilization Program Implementation Handbook

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This Facilities Utilization Program Implementation Handbook (FUPIH) prescribes procedures for the review and the reporting on the utilization of NASA facilities. The Directors of NASA Field Installations should designate an Installation Official responsible for coordinating the assignment of buildings space and implementing the facilities utilization reviews and annual report preparation. The individual designated shall be known as the 'Facilities Utilization Officer (FUO).' Functional responsibilities of the FUO are detailed in NASA Management Instruction (NMI) 7234.1. It is recognized that titles used in the implementation of the Facilities Utilization Program may vary between field installations. The Facilities Utilization Program (FUP) is designed to provide a uniform and orderly process for meeting or addressing the following objectives: the establishment of sound facilities requirements to meet NASA's programmatic and institutional needs; the optimum allocation of available facilities and related resources to meet these requirements; and the early identification and request for required additional facilities resources. The detailed review and reporting system enacted by NMI 7234.1 should encourage more comprehensive utilization planning for all NASA facilities and ensure, to the maximum extent practicable, that all such facilities are put to their highest and best use consistent with NASA programmatic and institutional priorities. A principal purpose of the FUP is the early identification of NASA facilities which may be or may become underutilized or excess to NASA needs and to provide a timely reference point from which corrective actions (i.e., consolidation, elimination of duplication, improved utilization of disposal) may be taken. Because the supply of this handbook is limited, distribution should be controlled at the field installation level.

  7. Implementation of the TsunamiReady Supporter Program in Puerto Rico

    NASA Astrophysics Data System (ADS)

    Flores Hots, V. E.; Vanacore, E. A.; Gonzalez Ruiz, W.; Gomez, G.

    2016-12-01

    The Puerto Rico Seismic Network (PRSN) manages the PR Tsunami Program (NTHMP), including the TsunamiReady Supporter Program. Through this program the PRSN helps private organizations, businesses, facilities or local government entities to willingly engage in tsunami planning and preparedness that meet some requirements established by the National Weather Service. TsunamiReady Supporter organizations are better prepared to respond to a tsunami emergency, developing a response plan (using a template that PRSN developed and provides), and reinforcing their communication systems including NOAA radio, RSS, and loud speakers to receive and disseminate the alerts issued by the NWS and the Tsunami Warning Centers (TWC). The planning and the communication systems added to the training that PRSN provides to the staff and employees, are intend to help visitors and employees evacuate the tsunami hazard zone to the nearest assembly point minimizing loss of life. Potential TsunamiReady Supporters include, but are not limited to, businesses, schools, churches, hospitals, malls, utilities, museums, beaches, and harbors. However, the traditional targets for such programs are primarily tourism sites and hotels where people unaware of the tsunami hazard may be present. In 2016 the Tsunami Ready Program guided four businesses to achieve the TsunamiReady Supporter recognition. Two facilities were hotels near or inside the evacuation zone. The other facilities were the first and only health center and supermarket to be recognized in the United States and US territories. Based on the experience of preparing the health center and supermarket sites, here we present two case studies of how the TsunamiReady Supporter Program can be applied to non-traditional facilities as well as how the application of this program to such facilities can improve tsunami hazard mitigation. Currently, we are working on expanding the application of this program to non-traditional facilities by working with a banking facility located in a tsunami evacuation zone increasing their capacity to manage a tsunami event and to reinforce the entity's involvement in developing a plan for their clients and employees to evacuate the area and head to a safe place.

  8. 75 FR 13806 - Agency Information Collection Activity Seeking OMB Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... 40117(k), Competition Plans, and to carry out a passenger facility charge application. DATES: Please... . SUPPLEMENTARY INFORMATION: Federal Aviation Administration (FAA) Title: Competition Plans, Passenger Facility...), Competition Plans, and to carry out a passenger facility charge application. The affected public includes...

  9. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES FOR CENTRAL SCHOOLS. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES, NO. 10.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    PLANNING OUTDOOR PHYSICAL EDUCATION FACILITIES FOR THE CENTRAL SCHOOL SERVING PUPILS FROM KINDERGARTEN THROUGH HIGH SCHOOL SHOULD TAKE INTO ACCOUNT THE NEEDS AND INTERESTS OF ALL PUPILS DURING THE SCHOOL YEAR AND SHOULD PROVIDE FOR RECREATION NEEDS DURING VACATION PERIODS. PROVISION FOR RECREATIONAL FACILITIES FOR ADULTS SHOULD ALSO BE MADE. THE…

  10. United States Department of Energy Environmental Restoration and Waste Management: Comment Response Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department's mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE's new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department's commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM's efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE's commitment to the culture change by involving the general public in its development.« less

  11. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  12. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  13. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  14. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  15. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  16. X-ray transport and radiation response assessment (XTRRA) experiments at the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fournier, K. B., E-mail: fournier2@llnl.gov; Brown, C. G.; Yeoman, M. F.

    2016-11-15

    Our team has developed an experimental platform to evaluate the x-ray-generated stress and impulse in materials. Experimental activities include x-ray source development, design of the sample mounting hardware and sensors interfaced to the National Ignition Facility’s diagnostics insertion system, and system integration into the facility. This paper focuses on the X-ray Transport and Radiation Response Assessment (XTRRA) test cassettes built for these experiments. The test cassette is designed to position six samples at three predetermined distances from the source, each known to within ±1% accuracy. Built-in calorimeters give in situ measurements of the x-ray environment along the sample lines ofmore » sight. The measured accuracy of sample responses as well as planned modifications to the XTRRA cassette is discussed.« less

  17. Response Modeling of Lightweight Charring Ablators and Thermal Radiation Testing Results

    NASA Technical Reports Server (NTRS)

    Congdon, William M.; Curry, Donald M.; Rarick, Douglas A.; Collins, Timothy J.

    2003-01-01

    Under NASA's In-Space Propulsion/Aerocapture Program, ARA conducted arc-jet and thermal-radiation ablation test series in 2003 for advanced development, characterization, and response modeling of SRAM-20, SRAM-17, SRAM-14, and PhenCarb-20 ablators. Testing was focused on the future Titan Explorer mission. Convective heating rates (CW) were as high as 153 W/sq cm in the IHF and radiation rates were 100 W/sq cm in the Solar Tower Facility. The ablators showed good performance in the radiation environment without spallation, which was initially a concern, but they also showed higher in-depth temperatures when compared to analytical predictions based on arc-jet thermal-ablation response models. More testing in 2003 is planned in both of these facility to generate a sufficient data base for Titan TPS engineering.

  18. X-ray transport and radiation response assessment (XTRRA) experiments at the National Ignition Facility

    DOE PAGES

    Fournier, K. B.; Brown, Jr., C. G.; Yeoman, M. F.; ...

    2016-08-10

    Our team has developed an experimental platform to evaluate the x-ray-generated stress and impulse in materials. Experimental activities include x-ray source development, design of the sample mounting hardware and sensors interfaced to the NIF’s diagnostics insertion system, and system integration into the facility. This paper focuses on the X-ray Transport and Radiation Response Assessment (XTRRA) test cassettes built for these experiments. The test cassette is designed to position six samples at three predetermined distances from the source, each known to within ±1% accuracy. Built in calorimeters give in situ measurements of the x-ray environment along the sample lines of sight.more » We discuss the measured accuracy of sample responses, as well as planned modifications to the XTRRA cassette.« less

  19. Hospital to Post-Acute Care Facility Transfers: Identifying Targets for Information Exchange Quality Improvement.

    PubMed

    Jones, Christine D; Cumbler, Ethan; Honigman, Benjamin; Burke, Robert E; Boxer, Rebecca S; Levy, Cari; Coleman, Eric A; Wald, Heidi L

    2017-01-01

    Information exchange is critical to high-quality care transitions from hospitals to post-acute care (PAC) facilities. We conducted a survey to evaluate the completeness and timeliness of information transfer and communication between a tertiary-care academic hospital and its related PAC facilities. This was a cross-sectional Web-based 36-question survey of 110 PAC clinicians and staff representing 31 PAC facilities conducted between October and December 2013. We received responses from 71 of 110 individuals representing 29 of 31 facilities (65% and 94% response rates). We collapsed 4-point Likert responses into dichotomous variables to reflect completeness (sufficient vs insufficient) and timeliness (timely vs not timely) for information transfer and communication. Among respondents, 32% reported insufficient information about discharge medical conditions and management plan, and 83% reported at least occasionally encountering problems directly related to inadequate information from the hospital. Hospital clinician contact information was the most common insufficient domain. With respect to timeliness, 86% of respondents desired receipt of a discharge summary on or before the day of discharge, but only 58% reported receiving the summary within this time frame. Through free-text responses, several participants expressed the need for paper prescriptions for controlled pain medications to be sent with patients at the time of transfer. Staff and clinicians at PAC facilities perceive substantial deficits in content and timeliness of information exchange between the hospital and facilities. Such deficits are particularly relevant in the context of the increasing prevalence of bundled payments for care across settings as well as forthcoming readmissions penalties for PAC facilities. Targets identified for quality improvement include structuring discharge summary information to include information identified as deficient by respondents, completion of discharge summaries before discharge to PAC facilities, and provision of hard-copy opioid prescriptions at discharge. Copyright © 2016 AMDA – The Society for Post-Acute and Long-Term Care Medicine. Published by Elsevier Inc. All rights reserved.

  20. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  1. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  2. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  3. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  4. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Eligibility to elect an MA plan for senior housing..., Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan, the...

  5. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  6. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  7. Oral healthcare access and adequacy in alternative long-term care facilities.

    PubMed

    Smith, Barbara J; Ghezzi, Elisa M; Manz, Michael C; Markova, Christiana P

    2010-01-01

    This study was undertaken to determine practices and perceived barriers to access related to oral health by surveying administrators in Michigan alternative long-term care facilities (ALTCF). A 24-item questionnaire was mailed to all 2,275 Michigan ALTCF serving residents aged 60+. Facility response rate was 22% (n = 508). Eleven percent of facilities had a written dental care plan; 18% stated a dentist examined new residents; and 19% of facilities had an agreement with a dentist to come to the facility, with 52% of those being for emergency care only. The greatest perceived barriers were willingness of general and specialty dentists to treat residents at the nursing facility and/or private offices as well as financial concerns. Substantial barriers to care were uniformly perceived. Oral health policies and practices within Michigan ALTCF vary, as measured by resources, attitudes, and the availability of professional care. There is limited involvement by dental professionals in creating policy and providing consultation and service.

  8. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  9. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  10. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  11. Securing PCs and Data in Libraries and Schools: A Handbook with Menuing, Anti-Virus, and Other Protective Software.

    ERIC Educational Resources Information Center

    Benson, Allen C.

    This handbook is designed to help readers identify and eliminate security risks, with sound recommendations and library-tested security software. Chapter 1 "Managing Your Facilities and Assessing Your Risks" addresses fundamental management responsibilities including planning for a secure system, organizing computer-related information, assessing…

  12. 44 CFR 350.7 - Application by State for review and approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coverage of response in the ingestion exposure pathway EPZ. The application will also include plans of all.... (b) Generally, the plume exposure pathway EPZ for nuclear power facilities shall consist of an area about 10 miles (16 Km) in radius and the ingestion exposure pathway EPZ shall consist of an area about...

  13. 44 CFR 350.7 - Application by State for review and approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coverage of response in the ingestion exposure pathway EPZ. The application will also include plans of all.... (b) Generally, the plume exposure pathway EPZ for nuclear power facilities shall consist of an area about 10 miles (16 Km) in radius and the ingestion exposure pathway EPZ shall consist of an area about...

  14. 44 CFR 350.7 - Application by State for review and approval.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coverage of response in the ingestion exposure pathway EPZ. The application will also include plans of all.... (b) Generally, the plume exposure pathway EPZ for nuclear power facilities shall consist of an area about 10 miles (16 Km) in radius and the ingestion exposure pathway EPZ shall consist of an area about...

  15. 44 CFR 350.7 - Application by State for review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coverage of response in the ingestion exposure pathway EPZ. The application will also include plans of all.... (b) Generally, the plume exposure pathway EPZ for nuclear power facilities shall consist of an area about 10 miles (16 Km) in radius and the ingestion exposure pathway EPZ shall consist of an area about...

  16. 44 CFR 350.7 - Application by State for review and approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coverage of response in the ingestion exposure pathway EPZ. The application will also include plans of all.... (b) Generally, the plume exposure pathway EPZ for nuclear power facilities shall consist of an area about 10 miles (16 Km) in radius and the ingestion exposure pathway EPZ shall consist of an area about...

  17. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) GENERAL Business and Industrial Loan Program Pt. 1980, Subpt. E, App. D Appendix D to Subpart E... designed utilizing accepted engineering practices and are conformed to applicable Federal, State and local... this appendix. (II) Technical Services. (A) The borrower is responsible for selecting engineering...

  18. 77 FR 76078 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, and Nuclear Energy... 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or... cyber security controls only. The operational and management controls, as described in Nuclear Energy...

  19. Disaster preparedness and response practices among providers from the Veterans Health Administration and Veterans with spinal cord injuries and/or disorders

    PubMed Central

    Hogan, Timothy P.; Holmes, Sally A.; Rapacki, Lauren M.; Evans, Charlesnika T.; Lindblom, Laurie; Hoenig, Helen; Goldstein, Barry; Hahm, Bridget; Weaver, Frances M.

    2011-01-01

    Objectives Few empirical studies have examined the disaster preparedness and response practices of individuals with spinal cord injuries and/or disorders (SCI/D) and the healthcare providers who serve them. This study was conducted to understand the experiences of Veterans Health Administration (VHA) providers and Veterans with SCI/D in recent natural disasters, and to identify lessons learned for disaster preparedness and response in the context of SCI/D. Design Semi-structured interviews were conducted with providers and Veterans recruited through seven VHA facilities that had sustained a disaster since 2003. Audio recordings of the interviews were transcribed; transcripts were analyzed using constant comparative techniques. Results Forty participants completed an interview, including 21 VHA SCI/D providers and 19 Veterans with SCI/D. Disasters experienced by participants were weather related. While many Veterans were evacuated or admitted to nearby VHA facilities, others chose to stay in their communities. All facilities had formal disaster plans and engaged in related training; however, participants explained that many aspects of a response take shape ‘in the moment,’ and must address both provider and Veteran needs. Dispersion of resources hindered well-coordinated care, but effective communication, teamwork, advanced warnings, and VHA's electronic medical record facilitated efforts. Conclusions Even in the case of thorough planning, Veterans with SCI/D and their healthcare providers are faced with pressing needs during disasters, and identifying strategies to coordinate care is critical. The lessons learned are intended to inform the efforts of healthcare providers who may be involved in the care of individuals with SCI/D in future disasters. PMID:21903009

  20. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  1. Maintenance Business Plans.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  2. Facility Planning for Physical Education, Recreation, and Athletics.

    ERIC Educational Resources Information Center

    Flynn, Richard B., Ed.

    This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…

  3. A Guide for Planning Indoor Facilities for College Physical Education.

    ERIC Educational Resources Information Center

    Crawford, Wayne H.

    Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…

  4. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  5. Planning the Library Media Center Facility for the 1990s and Beyond.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This manual presents recommendations for incorporating present and future technological changes into workable, efficient, pleasant school library media facilities in two major sections: Planning the Facility and Activity Areas. The first section addresses the planning process (appointing the building committee, evaluating the library media…

  6. School Building Designs: Principles and Challenges of the 21st Century.

    ERIC Educational Resources Information Center

    Chan, T. C.

    2002-01-01

    Reviews school-facility challenges and design principles described in 2000 U.S. Department of Education report on school planning and design. Describes additional school-facility design challenges and planning principles. Describes five critical facility-planning issues for the 21st Century. (Contains 14 references.) (PKP)

  7. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  8. Planning Physical Education and Athletic Facilities in Schools.

    ERIC Educational Resources Information Center

    Penman, Kenneth A.

    This book is primarily designed for a course in planning physical education and athletic facilities and as a supplementary textbook for administration courses. It illustrates the skills necessary for designing and planning facilities, stresses the need for effective communication between planners and users, and covers elementary through college…

  9. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

  10. Marine Planning for Potential Wave Energy Facility Placement Amongst a Crowded Sea of Existing Resource Uses

    NASA Astrophysics Data System (ADS)

    Feist, B. E.; Fuller, E.; Plummer, M. L.

    2016-12-01

    Conversion to renewable energy sources is a logical response to increasing pressure to reduce greenhouse gas emissions. Ocean wave energy is the least developed renewable energy source, despite having the highest energy per unit area. While many hurdles remain in developing wave energy, assessing potential conflicts and evaluating tradeoffs with existing uses is essential. Marine planning encompasses a broad array of activities that take place in and affect large marine ecosystems, making it an ideal tool for evaluating wave energy resource use conflicts. In this study, we focus on the potential conflicts between wave energy conversion (WEC) facilities and existing marine uses in the context of marine planning, within the California Current Large Marine Ecosystem. First, we evaluated wave energy facility development using the Wave Energy Model (WEM) of the Integrated Valuation of Ecosystem Services and Trade-offs (InVEST) toolkit. Second, we ran spatial analyses on model output to identify conflicts with existing marine uses including AIS based vessel traffic, VMS and observer based measures of commercial fishing effort, and marine conservation areas. We found that regions with the highest wave energy potential were distant from major cities and that infrastructure limitations (cable landing sites) restrict integration with existing power grids. We identified multiple spatial conflicts with existing marine uses; especially shipping vessels and various commercial fishing fleets, and overlap with marine conservation areas varied by conservation designation. While wave energy generation facilities may be economically viable in the California Current, this viability must be considered within the context of the costs associated with conflicts that arise with existing marine uses. Our analyses can be used to better inform placement of WEC devices (as well as other types of renewable energy facilities) in the context of marine planning by accounting for economic tradeoffs and providing spatially explicit site prioritization.

  11. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  12. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  13. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  14. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  15. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  16. 1996-1997 TEMA/DOE oversite annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This document reports on progress on these tasks during the past year.

  17. 1996--1997 TEMA/DOE oversight annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This report describes progress on the 14 deliverables connected with this contract.

  18. Primary healthcare system capacities for responding to storm and flood-related health problems: a case study from a rural district in central Vietnam

    PubMed Central

    Van Minh, Hoang; Tuan Anh, Tran; Rocklöv, Joacim; Bao Giang, Kim; Trang, Le Quynh; Sahlen, Klas-Göran; Nilsson, Maria; Weinehall, Lars

    2014-01-01

    Background As a tropical depression in the East Sea, Vietnam is greatly affected by climate change and natural disasters. Knowledge of the current capacity of the primary healthcare system in Vietnam to respond to health issues associated with storms and floods is very important for policy making in the country. However, there has been little scientific research in this area. Objective This research was to assess primary healthcare system capacities in a rural district in central Vietnam to respond to such health issues. Design This was a cross-sectional descriptive study using quantitative and qualitative approaches. Quantitative methods used self-administered questionnaires. Qualitative methods (in-depth interviews and focus groups discussions) were used to broaden understanding of the quantitative material and to get additional information on actions taken. Results 1) Service delivery: Medical emergency services, especially surgical operations and referral systems, were not always available during the storm and flood seasons. 2) Governance: District emergency plans focus largely on disaster response rather than prevention. The plans did not clearly define the role of primary healthcare and had no clear information on the coordination mechanism among different sectors and organizations. 3) Financing: The budget for prevention and control of flood and storm activities was limited and had no specific items for healthcare activities. Only a little additional funding was available, but the procedures to get this funding were usually time-consuming. 4) Human resources: Medical rescue teams were established, but there were no epidemiologists or environmental health specialists to take care of epidemiological issues. Training on prevention and control of climate change and disaster-related health issues did not meet actual needs. 5) Information and research: Data that can be used for planning and management (including population and epidemiological data) were largely lacking. The district lacked a disease early-warning system. 6) Medical products and technology: Emergency treatment protocols were not available in every studied health facility. Conclusions The primary care system capacity in rural Vietnam is inadequate for responding to storm and flood-related health problems in terms of preventive and treatment healthcare. Developing clear facility preparedness plans, which detail standard operating procedures during floods and identify specific job descriptions, would strengthen responses to future floods. Health facilities should have contingency funds available for emergency response in the event of storms and floods. Health facilities should ensure that standard protocols exist in order to improve responses in the event of floods. Introduction of a computerized health information system would accelerate information and data processing. National and local policies need to be strengthened and developed in a way that transfers into action in local rural communities. PMID:25511879

  19. Primary healthcare system capacities for responding to storm and flood-related health problems: a case study from a rural district in central Vietnam.

    PubMed

    Van Minh, Hoang; Tuan Anh, Tran; Rocklöv, Joacim; Bao Giang, Kim; Trang, Le Quynh; Sahlen, Klas-Göran; Nilsson, Maria; Weinehall, Lars

    2014-01-01

    As a tropical depression in the East Sea, Vietnam is greatly affected by climate change and natural disasters. Knowledge of the current capacity of the primary healthcare system in Vietnam to respond to health issues associated with storms and floods is very important for policy making in the country. However, there has been little scientific research in this area. This research was to assess primary healthcare system capacities in a rural district in central Vietnam to respond to such health issues. This was a cross-sectional descriptive study using quantitative and qualitative approaches. Quantitative methods used self-administered questionnaires. Qualitative methods (in-depth interviews and focus groups discussions) were used to broaden understanding of the quantitative material and to get additional information on actions taken. 1) Service delivery: Medical emergency services, especially surgical operations and referral systems, were not always available during the storm and flood seasons. 2) Governance: District emergency plans focus largely on disaster response rather than prevention. The plans did not clearly define the role of primary healthcare and had no clear information on the coordination mechanism among different sectors and organizations. 3) Financing: The budget for prevention and control of flood and storm activities was limited and had no specific items for healthcare activities. Only a little additional funding was available, but the procedures to get this funding were usually time-consuming. 4) Human resources: Medical rescue teams were established, but there were no epidemiologists or environmental health specialists to take care of epidemiological issues. Training on prevention and control of climate change and disaster-related health issues did not meet actual needs. 5) Information and research: Data that can be used for planning and management (including population and epidemiological data) were largely lacking. The district lacked a disease early-warning system. 6) Medical products and technology: Emergency treatment protocols were not available in every studied health facility. The primary care system capacity in rural Vietnam is inadequate for responding to storm and flood-related health problems in terms of preventive and treatment healthcare. Developing clear facility preparedness plans, which detail standard operating procedures during floods and identify specific job descriptions, would strengthen responses to future floods. Health facilities should have contingency funds available for emergency response in the event of storms and floods. Health facilities should ensure that standard protocols exist in order to improve responses in the event of floods. Introduction of a computerized health information system would accelerate information and data processing. National and local policies need to be strengthened and developed in a way that transfers into action in local rural communities.

  20. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

Top