Establishing a School-Based Mentoring Program for Youth Who Are Transitioning from a Secure Facility
ERIC Educational Resources Information Center
Waller, Katherine S.; Houchins, David E.; Nomvete, Patsy Thomas
2010-01-01
Youth with disabilities face many obstacles when transitioning from a juvenile detention facility back to school. A school-based mentoring program provides formerly incarcerated youth with support and encouragement from a caring, responsible adult. Youth with positive role models such as a mentor are more likely to successfully transition back to…
25 CFR 170.152 - What transit facilities and activities are eligible for IRR Program funding?
Code of Federal Regulations, 2010 CFR
2010-04-01
... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and... transit vehicle; (d) Preventive maintenance; (e) Leasing transit vehicles, equipment, buildings, and...
77 FR 48592 - Bus and Bus Facilities Discretionary Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... to award the funds for capital investments aimed at replacing or rehabilitating transit... (DOT) Federal Transit Administration (FTA) announces the selection of capital projects for the State of... Facilities Program funds. As outlined in the NOFA, the Section 5309 funds would be awarded for capital...
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR...) Transition plan. In the event that structural changes to facilities will be undertaken to achieve program...
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR...) Transition plan. In the event that structural changes to facilities will be undertaken to achieve program...
75 FR 23843 - Discretionary Bus and Bus Facilities Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... transit facilities and equipment. d. For facilities, evidence of proposed project compliance with ``Green Building'' certification. 3. For transit asset management system projects: If asset management system...-New York, Administrator, Region 7-Kansas One Bowling Green, Room 429, New City, MO, 901 Locust Street...
25 CFR 170.152 - What transit facilities and activities are eligible for IRR Program funding?
Code of Federal Regulations, 2014 CFR
2014-04-01
... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and... facilities that incorporate other community services; (h) Passenger shelters, bus stop signs, and similar...
25 CFR 170.152 - What transit facilities and activities are eligible for IRR Program funding?
Code of Federal Regulations, 2012 CFR
2012-04-01
... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and... facilities that incorporate other community services; (h) Passenger shelters, bus stop signs, and similar...
25 CFR 170.152 - What transit facilities and activities are eligible for IRR Program funding?
Code of Federal Regulations, 2013 CFR
2013-04-01
... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and... facilities that incorporate other community services; (h) Passenger shelters, bus stop signs, and similar...
25 CFR 170.152 - What transit facilities and activities are eligible for IRR Program funding?
Code of Federal Regulations, 2011 CFR
2011-04-01
... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and... facilities that incorporate other community services; (h) Passenger shelters, bus stop signs, and similar...
Smith-Merry, Jennifer; Mellifont, Damian; McKenzie, Kirsty; Clenaghan, Paul
2018-04-28
Despite significant need for mental health services targeting the requirements of inmates transitioning into the community there is little research about successful recovery-oriented or person-centred transition programs. This systematic narrative review brings together existing evidence to inform policymakers and practitioners about current practice in transition support, and barriers and facilitators of effective practice. We carried out a systematic narrative review of recovery-oriented or person-centred mental health support programs supporting transition from incarceration to the community. Results were obtained from a systematic search of Medline, PubMed and Scopus databases. We found 23 papers which met the paper inclusion criteria along with four other papers which were identified incidentally. Identified barriers to the implementation of effective transition support programs are: administrative problems leading to ineffective in-reach into correctional facilities or untimely support, lack of support for immediate needs meaning that inmates deprioritise their mental health needs, a lack of ongoing program resources and poor communication between correctional facilities and mental health services. Enablers for transition reflect the inverse of these barriers, alongside other successful strategies including medical home models, regionalised programs, programs which target connections with primary care, nurse-led patient-centred health programs and peer support initiatives.
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR... changes shall be made by August 22, 1989, but in any event as expeditiously as possible. (d) Transition...
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR... changes shall be made by August 22, 1989, but in any event as expeditiously as possible. (d) Transition...
25 CFR 170.148 - What is a tribal transit program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Transit Facilities § 170.148 What is a... operation and maintenance of a system associated with the public movement of people served within a...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... and green building initiatives for transit facilities and equipment. 3. For transit asset management... efficiency or reduces energy consumption/green house gas emissions. Proposers are encouraged to provide... to: 1. Improve energy efficiency or reduce energy consumption/green house gas emissions. Proposers...
75 FR 52054 - Bus and Bus Facilities Discretionary Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-24
... engaged in public transportation, or private non-profit organizations. FOR FURTHER INFORMATION CONTACT... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Bus and Bus Facilities Discretionary... program announcement of project selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal...
2001-09-05
This final rule modifies the Medicaid upper payment (UPL) limit provisions by establishing a new transition period for States that submitted plan amendments before March 13, 2001 that do not comply with the new UPLs effective on that date (but do comply with the prior UPLs) and were approved on or after January 22, 2001. This new transition period applies to payments for inpatient hospital services, outpatient hospital services, nursing facility services, intermediate care facility services for the mentally retarded, and clinic services.
Moore, Amber B; Krupp, J Elyse; Dufour, Alyssa B; Sircar, Mousumi; Travison, Thomas G; Abrams, Alan; Farris, Grace; Mattison, Melissa L P; Lipsitz, Lewis A
2017-10-01
Within 30 days of hospital discharge to a skilled nursing facility, older adults are at high risk for death, re-hospitalization, and high-cost health care. The purpose of this study was to examine whether a novel videoconference program called Extension for Community Health Outcomes-Care Transitions (ECHO-CT) that connects an interdisciplinary hospital-based team with clinicians at skilled nursing facilities reduces patient mortality, hospital readmission, skilled nursing facility length of stay, and 30-day health care costs. We undertook a prospective cohort study comparing cost and health care utilization outcomes between ECHO-CT facilities and matched comparisons from January 2014-December 2014. Thirty-day readmission rates were significantly lower in the intervention group (odds ratio 0.57; 95% CI, 0.34-0.96; P-value .04), as were the 30-day total health care cost ($2602.19 lower; 95% CI, -$4133.90 to -$1070.48; P-value <.001) and the average length of stay at the skilled nursing facility (-5.52 days; 95% CI, -9.61 to -1.43; P = .001). The 30-day mortality rate was not significantly lower in the intervention group (odds ratio 0.38; 95% CI, 0.11-1.24; P = .11). Patients discharged to skilled nursing facilities participating in the ECHO-CT program had shorter lengths of stay, lower 30-day rehospitalization rates, and lower 30-day health care costs compared with those in matched skilled nursing facilities delivering usual care. ECHO-CT may improve patient transitions to postacute care at lower overall cost. Copyright © 2017 Elsevier Inc. All rights reserved.
41 CFR 105-8.150-4 - Transition plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Transition plan. 105-8... Transition plan. In the event that structural changes to facilities will be undertaken to achieve program accessibility, the agency shall develop, by March 9, 1992; the transition plan setting forth the steps necessary...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-04
... Livability Initiative and Urban Circulator Program Grants AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice to Extend Application Deadline for the Bus and Bus Facilities and Urban Circulator..., Transportation Equity Act: A Legacy for Users (SAFETEA-LU), Public Law 109-59, August 10, 2005. The Urban...
The Evolution of an Adult Congenital Heart Surgery Program: The Emory System.
Kogon, Brian; Rosenblum, Joshua; Alsoufi, Bahaaldin; Shashidharan, Subhadra; Book, Wendy
2017-01-01
The Emory Adult Congenital Heart (Emory University, Atlanta, GA) program was founded in 2001. In 2004, the surgical component transitioned from a pediatric facility to an adult facility. The aim of this article is characterize the program as a whole, outline changes in the program, and discuss the challenges of the transition process. Between 2001 and 2015, changes in program structure and personnel were evaluated. There has been significant growth of the program between 2001 and 2015. There are currently 19 half-day clinics per week, with 2,700 clinic visits per year. There are six cardiologists, three congenital cardiac surgeons, two sonographers, one advanced practice provider, and one social worker dedicated to the program. There are Accreditation Council for Graduate Medical Education-accredited adult congenital cardiology and congenital cardiac surgery fellowships. One thousand forty-four operations were performed between 2001 and 2015. There were 828 open-heart operations, of which 581 (70%) were re-operations. Over the study period, the number of yearly operations increased from 30 to 119, and the mean age at surgery increased from 22 to 35 years. Over time, more of the operations were performed at the adult hospital: increasing from 3% in 2001 to 82% in 2015, and more of the operations were performed by congenital cardiac surgeons: 87% (114 of 131) before the 2004 transition to 97% (881 of 913) afterward. The Emory Adult Congenital Heart program has undergone significant growth and change, including transition of the surgical component from the pediatric to the adult facility. While numerous obstacles have been overcome and great progress has been made, additional challenges remain. Copyright © 2017 Elsevier Inc. All rights reserved.
22 CFR 217.22 - Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Existing facilities. 217.22 Section 217.22... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.22 Existing facilities... necessary to achieve full accessibility under § 217.22(a) and, if the time period of the transition plan is...
22 CFR 217.22 - Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Existing facilities. 217.22 Section 217.22... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.22 Existing facilities... necessary to achieve full accessibility under § 217.22(a) and, if the time period of the transition plan is...
22 CFR 217.22 - Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Existing facilities. 217.22 Section 217.22... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.22 Existing facilities... necessary to achieve full accessibility under § 217.22(a) and, if the time period of the transition plan is...
22 CFR 217.22 - Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Existing facilities. 217.22 Section 217.22... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.22 Existing facilities... necessary to achieve full accessibility under § 217.22(a) and, if the time period of the transition plan is...
22 CFR 217.22 - Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Existing facilities. 217.22 Section 217.22... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.22 Existing facilities... necessary to achieve full accessibility under § 217.22(a) and, if the time period of the transition plan is...
ERIC Educational Resources Information Center
Waintrup, Miriam G.; Unruh, Deanne K.
2008-01-01
Formerly incarcerated adolescents with disabilities face additional barriers to a successful transition to adulthood when released from the youth correctional facility often with societal expectations of transitioning directly to adulthood. Employment and post-secondary enrollment may serve as protective factors and reduce the likelihood of future…
The F-18 systems research aircraft facility
NASA Technical Reports Server (NTRS)
Sitz, Joel R.
1992-01-01
To help ensure that new aerospace initiatives rapidly transition to competitive U.S. technologies, NASA Dryden Flight Research Facility has dedicated a systems research aircraft facility. The primary goal is to accelerate the transition of new aerospace technologies to commercial, military, and space vehicles. Key technologies include more-electric aircraft concepts, fly-by-light systems, flush airdata systems, and advanced computer architectures. Future aircraft that will benefit are the high-speed civil transport and the National AeroSpace Plane. This paper describes the systems research aircraft flight research vehicle and outlines near-term programs.
Sandia, California Tritium Research Laboratory transition and reutilization project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, T.B.
1997-02-01
This paper describes a project within Sandia National Laboratory to convert the shut down Tritium Research Laboratory into a facility which could be reused within the laboratory complex. In the process of decommissioning and decontaminating the facility, the laboratory was able to save substantial financial resources by transferring much existing equipment to other DOE facilities, and then expeditiously implementing a decontamination program which has resulted in the building being converted into laboratory space for new lab programs. This project of facility reuse has been a significant financial benefit to the laboratory.
The Effectiveness and Need for Facility Based Nurse Aide Training Competency Evaluation Programs.
Mileski, Michael; McIlwain, Amber S; Kruse, Clemens Scott; Lieneck, Cristian; Sokan, Amanda
2016-01-01
It has become crucial for nursing facilities to rapidly train future nurse aides and remove any barriers to their matriculation into the field of care. Facilities feel the organizational burden of insufficient staffing and need to lever all effective programs to train future employees. The facility-based, Nurse Aide Training Competency Evaluation Programs (NATCEP) serve as a viable option to help fill shortages in the professional medical workforce. Data were analyzed from the National Nursing Assistant Survey to provide an overview of the benefits of using facility-trained nurse aides, versus those trained elsewhere, including their own perceptions of training and abilities. These findings also show the importance of facility based training programs for nurse aides on a global level. Providing training on site increases the efficiency and proficiency of nurse aides, making the transition to caregivers an easier for students, employers and residents.
NASA Astrophysics Data System (ADS)
Batyuk, P.; Blaschke, D.; Bleicher, M.; Ivanov, Yu. B.; Karpenko, Iu.; Merts, S.; Nahrgang, M.; Petersen, H.; Rogachevsky, O.
2016-10-01
We present an event generator based on the three-fluid hydrodynamics approach for the early stage of the collision, followed by a particlization at the hydrodynamic decoupling surface to join to a microscopic transport model, ultrarelativistic quantum molecular dynamics, to account for hadronic final-state interactions. We present first results for nuclear collisions of the Facility for Antiproton and Ion Research-Nuclotron-based Ion Collider Facility energy scan program (Au+Au collisions, √{sN N}=4 -11 GeV ). We address the directed flow of protons and pions as well as the proton rapidity distribution for two model equations of state, one with a first-order phase transition and the other with a crossover-type softening at high densities. The new simulation program has the unique feature that it can describe a hadron-to-quark matter transition which proceeds in the baryon stopping regime that is not accessible to previous simulation programs designed for higher energies.
DOT National Transportation Integrated Search
1996-08-01
Although there are over one thousand transit buses in revenue service in the U.S. that are powered by alternative fuels, there are no comprehensive guidelines for the safe design and operation of alternative fuel facilities and vehicles for transit s...
2012-04-14
CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, media representatives interview space shuttle managers following the arrival of space shuttle Discovery. Behind the rope with their backs to the camera are, from left, Bart Pannullo, NASA Transition and Retirement vehicle manager at Kennedy Dorothy Rasco, manager for Space Shuttle Program Transition and Retirement at NASA’s Johnson Space Center Stephanie Stilson, NASA flow director for Orbiter Transition and Retirement at Kennedy and Kevin Templin, transition manager for the Space Shuttle Program at Johnson. Discovery will be hoisted onto a Shuttle Carrier Aircraft, or SCA, with the aid of the mate-demate device at the landing facility. The SCA, a modified Boeing 747 jet airliner, is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on permanent public display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Kim Shiflett
Characterizing K2 Exoplanets with NIR Transit Photometry from the 3.5m WIYN Telescope
NASA Astrophysics Data System (ADS)
Colon, Knicole D.; Barclay, Thomas; Thompson, Susan E.; Coughlin, Jeffrey; Barentsen, Geert; Quintana, Elisa V.
2017-01-01
The NASA K2 mission has discovered over 400 transiting exoplanets as of October 2016 and continues to produce new discoveries on a regular basis. Expected to launch in late 2017, the Transiting Exoplanet Survey Satellite (TESS) will continue the era of exoplanet discovery by performing an all-sky search for transiting exoplanets. Given the ever increasing number of known exoplanets, it is critical that we optimize follow-up observations now in order to characterize the many interesting systems discovered by these missions. For example, K2 is finding (and TESS will find even more) small, super-Earth-size planets around cool, nearby stars. I will present results from our program for near-infrared (NIR) transit photometry of K2 exoplanet candidates conducted using the 3.5m WIYN telescope at Kitt Peak National Observatory. NIR transit photometry with the high spatial resolution WHIRC imager installed on the WIYN telescope allows us to confirm the transit host, to verify that the transit is achromatic, and to constrain the planet radius by minimizing effects of stellar limb darkening. Furthermore, the high-precision and high-cadence photometry from WIYN+WHIRC allows us to track and constrain the transit ephemeris, which is crucial for future follow-up efforts with other facilities like the upcoming James Webb Space Telescope (JWST). Ultimately, this program will vet K2 exoplanet candidates and identify prime targets for detailed characterization with JWST. This program complements K2 follow-up being done with the Spitzer Space Telescope and demonstrates the capabilities of a ground-based facility that can be used to characterize small planets from K2 and TESS for years to come.This work was supported by the NASA-NSF Exoplanet Observational Research (NN-EXPLORE) program.
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Schlank, John J.
2010-01-01
In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.
Abrupt Transitions for Youths Leaving School: Models of Interagency Cooperation.
ERIC Educational Resources Information Center
Karcz, Stanley A.; And Others
1985-01-01
Three programs that have been successful in facilitating the reenrollment of students from exiting juvenile detention facilities are described: the Lake County, IL, Youth Advocate Liaison Program; the Lake County, Florida, Multiagency/Special Education Program; and the Rock Island, Illinois, Coalition High School Model. (CL)
ERIC Educational Resources Information Center
Anders, Allison Daniel; Noblit, George W.
2011-01-01
The North Carolina Workplace and Community Transition Youth Offender Program (YOP), recently renamed the Incarcerated Individuals Program (IPP), has proven to be effective in terms of its growth and expansion, the support of education directors across the correctional facilities, university collaboration, student evaluations, and a low recidivism…
Moses, E. I.; Lindl, J. D.; Spaeth, M. L.; ...
2017-03-23
The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory has been operational since March 2009 and has been transitioning to a user facility supporting ignition science, high energy density stockpile science, national security applications, and fundamental science. The facility has achieved its design goal of 1.8 MJ and 500 TW of 3ω light on target, and has performed target experiments with 1.9 MJ at peak powers of 410 TW. The National Ignition Campaign (NIC), established by the U.S. National Nuclear Security Administration in 2005, was responsible for transitioning NIF from a construction project to a national user facility. Besidesmore » the operation and optimization of the use of the NIF laser, the NIC program was responsible for developing capabilities including target fabrication facilities; cryogenic layering capabilities; over 60 optical, X-ray, and nuclear diagnostic systems; experimental platforms; and a wide range of other NIF facility infrastructure. This study provides a summary of some of the key experimental results for NIF to date, an overview of the NIF facility capabilities, and the challenges that were met in achieving these capabilities. Finally, they are covered in more detail in the papers that follow.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moses, E. I.; Lindl, J. D.; Spaeth, M. L.
The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory has been operational since March 2009 and has been transitioning to a user facility supporting ignition science, high energy density stockpile science, national security applications, and fundamental science. The facility has achieved its design goal of 1.8 MJ and 500 TW of 3ω light on target, and has performed target experiments with 1.9 MJ at peak powers of 410 TW. The National Ignition Campaign (NIC), established by the U.S. National Nuclear Security Administration in 2005, was responsible for transitioning NIF from a construction project to a national user facility. Besidesmore » the operation and optimization of the use of the NIF laser, the NIC program was responsible for developing capabilities including target fabrication facilities; cryogenic layering capabilities; over 60 optical, X-ray, and nuclear diagnostic systems; experimental platforms; and a wide range of other NIF facility infrastructure. This study provides a summary of some of the key experimental results for NIF to date, an overview of the NIF facility capabilities, and the challenges that were met in achieving these capabilities. Finally, they are covered in more detail in the papers that follow.« less
Transiting Exoplanet Studies and Community Targets for JWST's Early Release Science Program
NASA Technical Reports Server (NTRS)
Stevenson, Kevin B.; Lewis, Nikole K.; Bean, Jacob L.; Beichman, Charles A.; Fraine, Jonathan; Kilpatrick, Brian M.; Krick, J. E.; Lothringer, Joshua D.; Mandell, Avi M.; Valenti, Jeff A.;
2016-01-01
The James Webb Space Telescope (JWST) will likely revolutionize transiting exoplanet atmospheric science, due to a combination of its capability for continuous, long duration observations and its larger collecting area, spectral coverage, and spectral resolution compared to existing space-based facilities. However, it is unclear precisely how well JWST will perform and which of its myriad instruments and observing modes will be best suited for transiting exoplanet studies. In this article, we describe a prefatory JWST Early Release Science (ERS) Cycle 1 program that focuses on testing specific observing modes to quickly give the community the data and experience it needs to plan more efficient and successful transiting exoplanet characterization programs in later cycles. We propose a multi-pronged approach wherein one aspect of the program focuses on observing transits of a single target with all of the recommended observing modes to identify and understand potential systematics, compare transmission spectra at overlapping and neighboring wavelength regions, confirm throughputs, and determine overall performances. In our search for transiting exoplanets that are well suited to achieving these goals, we identify 12 objects (dubbed community targets'') that meet our defined criteria. Currently, the most favorable target is WASP-62b because of its large predicted signal size, relatively bright host star, and location in JWST's continuous viewing zone. Since most of the community targets do not have well-characterized atmospheres, we recommend initiating preparatory observing programs to determine the presence of obscuring clouds/hazes within their atmospheres. Measurable spectroscopic features are needed to establish the optimal resolution and wavelength regions for exoplanet characterization. Other initiatives from our proposed ERS program include testing the instrument brightness limits and performing phase-curve observations. The latter are a unique challenge compared to transit observations because of their significantly longer durations. Using only a single mode, we propose to observe a full-orbit phase curve of one of the previously characterized, short-orbital-period planets to evaluate the facility-level aspects of long, uninterrupted time-series observations.
Transiting Exoplanet Studies and Community Targets for JWST's Early Release Science Program
NASA Technical Reports Server (NTRS)
Stevenson, Kevin B.; Lewis, Nikole K.; Bean, Jacob L.; Beichman, Charles; Fraine, Jonathan; Kilpatrick, Brian M.; Krick, J. E.; Lothringer, Joshua D.; Mandell, Avi M.; Valenti, Jeff A.;
2016-01-01
The James Webb Space Telescope (JWST) will likely revolutionize transiting exoplanet atmospheric science, due to a combination of its capability for continuous, long duration observations and its larger collecting area, spectral coverage, and spectral resolution compared to existing space-based facilities. However, it is unclear precisely how well JWST will perform and which of its myriad instruments and observing modes will be best suited for transiting exoplanet studies. In this article, we describe a prefatory JWST Early Release Science (ERS) Cycle1 program that focuses on testing specific observing modes to quickly give the community the data and experience it needs to plan more efficient and successful transiting exoplanet characterization programs in later cycles. We propose a multi-pronged approach wherein one aspect of the program focuses on observing transits of a single target with all of the recommended observing modes to identify and understand potential systematics, compare transmission spectra at overlapping and neighboring wavelength regions, confirm throughputs, and determine overall performances. In our search for transiting exoplanets that are well suited to achieving these goals, we identify 12 objects (dubbed community targets) that meet our defined criteria. Currently, the most favorable target is WASP-62b because of its large predicted signal size, relatively bright host star, and location in JWSTs continuous viewing zone. Since most of the community targets do not have well-characterized atmospheres, we recommend initiating preparatory observing programs to determine the presence of obscuring cloudshazes within their atmospheres. Measurable spectroscopic features are needed to establish the optimal resolution and wavelength regions for exoplanet characterization. Other initiatives from our proposed ERS program include testing the instrument brightness limits and performing phase-curve observations. The latter are a unique challenge compared to transit observations because of their significantly longer durations. Using only a single mode, we propose to observe a full-orbit phase curve of one of the previously characterized, short-orbital-period planets to evaluate the facility-level aspects of long, uninterrupted time-series observations.
Transiting Exoplanet Studies and Community Targets for JWST's Early Release Science Program
NASA Astrophysics Data System (ADS)
Stevenson, Kevin B.; Lewis, Nikole K.; Bean, Jacob L.; Beichman, Charles; Fraine, Jonathan; Kilpatrick, Brian M.; Krick, J. E.; Lothringer, Joshua D.; Mandell, Avi M.; Valenti, Jeff A.; Agol, Eric; Angerhausen, Daniel; Barstow, Joanna K.; Birkmann, Stephan M.; Burrows, Adam; Charbonneau, David; Cowan, Nicolas B.; Crouzet, Nicolas; Cubillos, Patricio E.; Curry, S. M.; Dalba, Paul A.; de Wit, Julien; Deming, Drake; Désert, Jean-Michel; Doyon, René; Dragomir, Diana; Ehrenreich, David; Fortney, Jonathan J.; García Muñoz, Antonio; Gibson, Neale P.; Gizis, John E.; Greene, Thomas P.; Harrington, Joseph; Heng, Kevin; Kataria, Tiffany; Kempton, Eliza M.-R.; Knutson, Heather; Kreidberg, Laura; Lafrenière, David; Lagage, Pierre-Olivier; Line, Michael R.; Lopez-Morales, Mercedes; Madhusudhan, Nikku; Morley, Caroline V.; Rocchetto, Marco; Schlawin, Everett; Shkolnik, Evgenya L.; Shporer, Avi; Sing, David K.; Todorov, Kamen O.; Tucker, Gregory S.; Wakeford, Hannah R.
2016-09-01
The James Webb Space Telescope (JWST) will likely revolutionize transiting exoplanet atmospheric science, due to a combination of its capability for continuous, long duration observations and its larger collecting area, spectral coverage, and spectral resolution compared to existing space-based facilities. However, it is unclear precisely how well JWST will perform and which of its myriad instruments and observing modes will be best suited for transiting exoplanet studies. In this article, we describe a prefatory JWST Early Release Science (ERS) Cycle 1 program that focuses on testing specific observing modes to quickly give the community the data and experience it needs to plan more efficient and successful transiting exoplanet characterization programs in later cycles. We propose a multi-pronged approach wherein one aspect of the program focuses on observing transits of a single target with all of the recommended observing modes to identify and understand potential systematics, compare transmission spectra at overlapping and neighboring wavelength regions, confirm throughputs, and determine overall performances. In our search for transiting exoplanets that are well suited to achieving these goals, we identify 12 objects (dubbed “community targets”) that meet our defined criteria. Currently, the most favorable target is WASP-62b because of its large predicted signal size, relatively bright host star, and location in JWST's continuous viewing zone. Since most of the community targets do not have well-characterized atmospheres, we recommend initiating preparatory observing programs to determine the presence of obscuring clouds/hazes within their atmospheres. Measurable spectroscopic features are needed to establish the optimal resolution and wavelength regions for exoplanet characterization. Other initiatives from our proposed ERS program include testing the instrument brightness limits and performing phase-curve observations. The latter are a unique challenge compared to transit observations because of their significantly longer durations. Using only a single mode, we propose to observe a full-orbit phase curve of one of the previously characterized, short-orbital-period planets to evaluate the facility-level aspects of long, uninterrupted time-series observations.
Air Force Civil Engineer, Volume 9, Number 1, Spring 2001
2001-01-01
generated some important lessons learned. The Gulf War was a wakeup call for contingency training. When it began, many in CE had never trained on bare...square foot, corrosion control facility at Charleston Air Force Base, S.C. Construction is scheduled for comple- tion in early 2002. The facility is...Rhein Main Transition Program. This program, scheduled for completion in 2005, transfers operational capability from Rhein Main AB to Spangdahlem and
Kassie, Getnet M; Belay, Teklu; Sharma, Anjali; Feleke, Getachew
2018-01-01
Focus on improving access and quality of HIV care and treatment gained acceptance in Ethiopia through the work of the International Training and Education Center for Health. The initiative deployed mobile field-based teams and capacity building teams to mentor health care providers on clinical services and program delivery in three regions, namely Tigray, Amhara, and Afar. Transitioning of the clinical mentoring program (CMP) began in 2012 through capacity building and transfer of skills and knowledge to local health care providers and management. The initiative explored the process of transitioning a CMP on HIV care and treatment to local ownership and documented key lessons learned. A mixed qualitative design was used employing focus group discussions, individual in-depth interviews, and review of secondary data. The participants included regional focal persons, mentors, mentees, multidisciplinary team members, and International Training and Education Center for Health (I-TECH) staff. Three facilities were selected in each region. Data were collected by trained research assistants using customized guides for interviews and with data extraction format. The interviews were recorded and fully transcribed. Open Code software was used for coding and categorizing the data. A total of 16 focus group discussions and 20 individual in-depth interviews were conducted. The critical processes for transitioning a project were: establishment of a mentoring transition task force, development of a roadmap to define steps and directions for implementing the transition, and signing of a memorandum of understanding (MOU) between the respective regional health bureaus and I-TECH Ethiopia to formalize the transition. The elements of implementation included mentorship and capacity building, joint mentoring, supportive supervision, review meetings, and independent mentoring supported by facility-based mechanisms: multidisciplinary team meetings, case-based discussions, and catchment area meetings. The process of transitioning the CMP to local ownership involved signing an MOU, training of mentors, and building capacity of mentoring in each region. The experience shed light on how to transition donor-supported work to local country ownership, with key lessons related to strengthening the structures of regional health bureaus, and other facilities addressing critical issues and ensuring continuity of the facility-based activities.
ERIC Educational Resources Information Center
Allen, Harry E.; And Others
This program model focuses on adult residential inmate aftercare programs. Critical issues in halfway house operations, a model for evaluation, and innovative variations are discussed. The facilities discussed include public and private halfway houses that provide residential services to adult offenders as a transitional step between their release…
Using Self-Determination Theory in Correctional Education Program Development
ERIC Educational Resources Information Center
McKinney, Dani; Cotronea, Michael A.
2011-01-01
As funding has become available through the Second Chance Act of 2007, many correctional facilities have developed new educational programs in an effort to ease the transition from prison to community. Many new programs are developed based on the belief that incarcerated individuals are a special and unique population of student. The present…
Lathia, Amanda; Rothberg, Michael; Heflin, Mitchell; Nottingham, Kelly; Messinger-Rapport, Barbara
2015-10-01
Medical students report that they receive inadequate training in different levels of care, including care transitions to and from post-acute (PA) and long-term care (LTC). The authors implemented the Medical Students as Teachers in Extended Care (MedTEC) program as an educational innovation at the Cleveland Clinic to address training in the care-continuum, as well as the new medical student and physician competencies in PA/LTC. MedTEC is a 7-hour interactive program that supplements standard geriatric didactics during the medical student primary care rotation. This study evaluated the performance of the program in improving medical student knowledge and attitudes on levels and transitions of care. The program occurs in a community facility that includes subacute/skilled nursing, assisted living, and nursing home care. Five to 8 students completing their primary care rotation at the Cleveland Clinic are required to participate in the MedTEC program each month. The program includes up to 3 hours of interactive discussion and opportunities to meet facility staff, residents, and patients. The highlight of the program is a student-led in-service for facility staff. With institutional review board approval as an exempt educational research project, pre- and postactivity surveys assessed self-efficacy and knowledge regarding levels of care for students who participated in the program and a student comparison group. The post-program knowledge test also was administered to hospital medicine staff, and test performance was compared with medical students who participated in the MedTEC program. Between October 2011 and December 2013, approximately 100 students participated in 20 sessions of MedTEC. All students reported improved self-efficacy and attitudes regarding care of older adults and care transition management. Mean percentage correct on the knowledge test increased significantly from 59.8% to 71.2% (P = .004) for the MedTEC participants but not for the comparison group students (63.1%-58.3%, P = .47). There was no significant difference in mean percentage correct on the post-program knowledge test between MedTEC medical students and hospitalists (71.0% versus 70.3%, P = .86). Students led 8 in-service sessions for facility staff on various topics relating to the care of older adults in PA/LTC. The MedTEC program appears to be a successful innovation in medical student education on levels of care. It could serve as a model for building competency of health professionals on managing care transitions and determining appropriate levels of care for older adults. Copyright © 2015 AMDA – The Society for Post-Acute and Long-Term Care Medicine. Published by Elsevier Inc. All rights reserved.
The Next Century Astrophysics Program
NASA Technical Reports Server (NTRS)
Swanson, Paul N.
1991-01-01
The Astrophysics Division within the NASA Office of Space Science and Applications (OSSA) has defined a set of major and moderate missions that are presently under study for flight sometime within the next 20 years. These programs include the: Advanced X Ray Astrophysics Facility; X Ray Schmidt Telescope; Nuclear Astrophysics Experiment; Hard X Ray Imaging Facility; Very High Throughput Facility; Gamma Ray Spectroscopy Observatory; Hubble Space Telescope; Lunar Transit Telescope; Astrometric Interferometer Mission; Next Generation Space Telescope; Imaging Optical Interferometer; Far Ultraviolet Spectroscopic Explorer; Gravity Probe B; Laser Gravity Wave Observatory in Space; Stratospheric Observatory for Infrared Astronomy; Space Infrared Telescope Facility; Submillimeter Intermediate Mission; Large Deployable Reflector; Submillimeter Interferometer; and Next Generation Orbiting Very Long Baseline Interferometer.
25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds
Code of Federal Regulations, 2010 CFR
2010-04-01
... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...
25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds
Code of Federal Regulations, 2014 CFR
2014-04-01
... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...
25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds
Code of Federal Regulations, 2012 CFR
2012-04-01
... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...
25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds
Code of Federal Regulations, 2013 CFR
2013-04-01
... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...
25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds
Code of Federal Regulations, 2011 CFR
2011-04-01
... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...
Lea, Jackie; Cruickshank, Mary
2015-04-01
The aim of this paper is to present the findings from the new graduate nurse participants of a larger study that explored the transitional experiences of newly graduated nurses making the role transition in rural health care facilities in Australia. Evidence indicates that workload, skill mix and organizational pressures are still of concern for new nursing graduates within the Australian context and internationally. Many graduates are expected by employers to have high levels of independence, well developed problem solving abilities and be able to assume management and leadership responsibilities early in their graduate year. An exploratory, descriptive, qualitative case study design was utilised to determine the particular support needs over time that would assist with a safe transition to the rural nursing workforce. The aims of the study were to: (1) Explore the new graduate nurses' perceptions and experience of the nature and timing of support throughout their Transition to Practice Program in a rural setting; (2) Identify the functional elements of rural graduate nurse transition programs and develop guidelines that will assist in the design of Transition to Practice Programs that match the rural context and capacity. A purposive sample of 15 new graduate nurses who had commenced a 12 month Transition to Practice Program within a rural health facility from northern New South Wales, Australia, participated in this study. In-depth individual interviews with the new graduate nurses were conducted at time intervals of three to four months, six to seven months and 10 to 11 months. One of the key findings of this study is that as the new graduate nurse making the transition to professional rural nursing practice moves along the transition continuum, there are particular and unique aspects of the rural nurse's role and responsibilities for which the new graduate nurse will require specific learning support during their transition. When the new graduate moves from the role of the student to the less familiar role of professional practitioner, it is important that a rural Transition to Practice Program offers an incrementally staged workload and responsibilities that recognises the graduate's beginning nurse status. The study contributes new knowledge to the discussion of issues concerning support mechanisms for new graduate nurses as they make the transition to rural nursing practice. © 2014 John Wiley & Sons Ltd.
76 FR 8811 - FTA Fiscal Year 2011 Apportionments, Allocations and Program Information: Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... Apportionments) and Table 10 (Prior Year Unobligated Section 5309 Bus and Bus Related Equipment and Facilities... DEPARTMENT OF TRANSPORTATION Federal Transit Administration FTA Fiscal Year 2011 Apportionments... titled ``FTA Fiscal Year 2011 Apportionments, Allocations and Program Information.'' FOR FURTHER...
Characterization monitoring & sensor technology crosscutting program
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the OFfice of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60).
Summer Literacy Intervention for Homeless Children Living in Transitional Housing
ERIC Educational Resources Information Center
Willard, Adrienne Lisa; Kulinna, Pamela Hodges
2012-01-01
This study reports the findings of a six-week summer literacy program conducted at a transitional housing facility for homeless families in the Southwestern region of the U.S. This study is grounded on the body of knowledge on students' literacy and homelessness. The intervention included one-on-one instruction by tutors. This study examined…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
..., found health care played a key role in the first months of community re-adjustment and reduced... abuse, Alcoholism, Claims, Day care, Dental health, Drug abuse, Foreign relations, Government contracts, Grant programs--health, Grant programs--veterans, Health care, Health facilities, Health professions...
Selected Colorado Technology Education Programs.
ERIC Educational Resources Information Center
Gloeckner, Gene W.
The transition from industrial arts to technology education is a priority in Colorado. Millions of dollars have been and will be spent to renovate industrial arts facilities and laboratories. Four Colorado middle schools have exemplary technology education programs. The Eagle Crest Technology Education Laboratory is used for both middle and high…
Birnbaum, Shira; Sperber-Weiss, Doreen; Dimitrios, Timothy; Eckel, Donald; Monroy-Miller, Cherry; Monroe, Janet J; Friedman, Ross; Ologbosele, Mathias; Epo, Grace; Sharpe, Debra; Zarski, Yongsuk
A large state psychiatric hospital experienced a state-mandated Reduction in Force that resulted in the abrupt loss and rapid turnover of more than 40% of its nursing and paraprofessional staff. The change exemplified current national trends toward downsizing and facility closure. This article describes revisions to the nursing orientation program that supported cost containment and fidelity to mission and clinical practices during the transition. An existing nursing orientation program was reconfigured in alignment with principles of rational instructional design and a core-competencies model of curriculum development, evidence-based practices that provided tactical clarity and commonality of purpose during a complex and emotionally charged transition period. Program redesign enabled efficiencies that facilitated the transition, with no evidence of associated negative effects. The process described here offers an example for hospitals facing similar workforce reorganization in an era of public sector downsizing.
Developing a Natural Gas-Powered Bus Rapid Transit Service. A Case Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mitchell, George
2015-11-01
The Roaring Fork Transit Authority (RFTA) and its VelociRFTA Bus Rapid Transit (BRT) program are unique in many ways. For example, VelociRFTA was the first rural BRT system in the United States and the operational environment of the VelociRFTA BRT is one of the most severe in the country, with extreme winter temperatures and altitudes close to 8,000 feet. RFTA viewed high altitude operation as the most challenging characteristic when it began considering the use of natural gas. RFTA is the second-largest public transit system in Colorado behind Denver's Regional Transportation District (RTD), and it is one of the largestmore » rural public transit systems in the country. In 2013, RFTA accepted delivery of 22 new compressed natural gas (CNG) buses that went into service after completion of maintenance and refueling facilities earlier that year. This paper examines the lessons learned from RFTA's experience of investigating--and ultimately choosing--CNG for their new BRT program and focuses on the unique environment of RFTA's BRT application; the decision process to include CNG fueling in the project; unforeseen difficulties encountered in the operation of CNG buses; public perception; cost comparison to competing fuels; and considerations for indoor fueling facilities and project funding.« less
Developing a Natural Gas-Powered Bus Rapid Transit Service: A Case Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mitchell, G.
2015-11-03
The Roaring Fork Transit Authority (RFTA) and its VelociRFTA Bus Rapid Transit (BRT) program are unique in many ways. For example, VelociRFTA was the first rural BRT system in the United States and the operational environment of the VelociRFTA BRT is one of the most severe in the country, with extreme winter temperatures and altitudes close to 8,000 feet. RFTA viewed high altitude operation as the most challenging characteristic when it began considering the use of natural gas. RFTA is the second-largest public transit system in Colorado behind Denver's Regional Transportation District (RTD), and it is one of the largestmore » rural public transit systems in the country. In 2013, RFTA accepted delivery of 22 new compressed natural gas (CNG) buses that went into service after completion of maintenance and refueling facilities earlier that year. This paper examines the lessons learned from RFTA's experience of investigating--and ultimately choosing--CNG for their new BRT program and focuses on the unique environment of RFTA's BRT application; the decision process to include CNG fueling in the project; unforeseen difficulties encountered in the operation of CNG buses; public perception; cost comparison to competing fuels; and considerations for indoor fueling facilities and project funding.« less
1982-02-08
although non-aligned, Malaysia , Indonesia, and Singapore support U.S. presence in South- east Asia and allow unhampered U.S. transit of the vital...modernization of obsolete facilities, maintenance of existing facilities, energy conservation, compliance with environmental and OSHA stan- dards, and NATO
Facility and market factors affecting transitions from nursing home to community.
Arling, Greg; Abrahamson, Kathleen A; Cooke, Valerie; Kane, Robert L; Lewis, Teresa
2011-09-01
Research into nursing home transitions has given limited attention to the facility or community contexts. To identify facility and market factors affecting transitions of nursing home residents back to the community. Multilevel models were used to estimate effects of facility and market factors on facility-level community discharge rates after controlling for resident demographic, health, and functional conditions. Facility discharge rates were adjusted using Empirical Bayes estimation. Annual cohort of first-time admissions (N=24,648) to 378 Minnesota nursing facilities in 75 nursing home markets from July 2005 to June 2006. Community discharge within 90 days of admission; facility occupancy, payer mix, ownership, case-mix acuity, size, admissions from hospitals, nurse staffing level, and proportion of admissions preferring or having support to return to the community; and nursing market population size, average occupancy, market concentration, and availability of home and community-based services. Rates of community discharge (Empirical Bayes residual) were highest in facilities with more residents preferring community discharge, more Medicare days, higher nurse staffing levels, and higher occupancy. In addition, facilities had higher community discharge rates if they were located in markets with a greater ratio of home and community-based services recipients to nursing home residents and with larger populations. State Medicaid programs should undertake system-level interventions that encourage nursing facilities to reduce unused bed capacity, balance the mix of payers, invest in nurse staffing, and take other steps to promote community discharges. In addition, states should increase home and community-based services, particularly in markets with low community discharge rates.
Tug fleet and ground operations schedules and controls. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.
N Reactor Deactivation Program Plan. Revision 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, J.L.
1993-12-01
This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less
ERIC Educational Resources Information Center
Kithyo, Isaac Mattemu; Petrina, Stephen
2002-01-01
A study of 39 technical college students in Kenya found the majority enrolled in gender-traditional programs. Although school facilities, guidance, and labor market orientation played a part, gender was the most persuasive factor in career choice. Parental pressure and stereotypical guidance reinforced gender norms, but some students were able to…
2012-09-19
CAPE CANAVERAL, Fla. – Space shuttle Endeavour, mounted atop NASA's Shuttle Carrier Aircraft or SCA, taxis down the runway at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The SCA, a modified 747 jetliner, will fly Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Rusty Backer The SCA, a modified 747 jetliner, will fly Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Jim Grossmann
Merging the Community & Curriculum.
ERIC Educational Resources Information Center
DeWitt, Douglas M.; Joyce, Kay
2001-01-01
An abandoned downtown shopping mall in Burnsville, Minnesota, was transformed into an innovative senior campus that also relieved overcrowding at the main facility. Seniors pursued "community-connections" experiences via programs involving mass media, the transit authority, the battered women's shelter, public affairs, creative writing, and…
Forecasting client transitions in British Columbia's Long-Term Care Program.
Lane, D; Uyeno, D; Stark, A; Gutman, G; McCashin, B
1987-01-01
This article presents a model for the annual transitions of clients through various home and facility placements in a long-term care program. The model, an application of Markov chain analysis, is developed, tested, and applied to over 9,000 clients (N = 9,483) in British Columbia's Long Term Care Program (LTC) over the period 1978-1983. Results show that the model gives accurate forecasts of the progress of groups of clients from state to state in the long-term care system from time of admission until eventual death. Statistical methods are used to test the modeling hypothesis that clients' year-over-year transitions occur in constant proportions from state to state within the long-term care system. Tests are carried out by examining actual year-over-year transitions of each year's new admission cohort (1978-1983). Various subsets of the available data are analyzed and, after accounting for clear differences among annual cohorts, the most acceptable model of the actual client transition data occurred when clients were separated into male and female groups, i.e., the transition behavior of each group is describable by a different Markov model. To validate the model, we develop model estimates for the numbers of existing clients in each state of the long-term care system for the period (1981-1983) for which actual data are available. When these estimates are compared with the actual data, total weighted absolute deviations do not exceed 10 percent of actuals. Finally, we use the properties of the Markov chain probability transition matrix and simulation methods to develop three-year forecasts with prediction intervals for the distribution of the existing total clients into each state of the system. The tests, forecasts, and Markov model supplemental information are contained in a mechanized procedure suitable for a microcomputer. The procedure provides a powerful, efficient tool for decision makers planning facilities and services in response to the needs of long-term care clients. PMID:3121537
NASA's hypersonic fluid and thermal physics program (Aerothermodynamics)
NASA Technical Reports Server (NTRS)
Graves, R. A.; Hunt, J. L.
1985-01-01
This survey paper gives an overview of NASA's hypersonic fluid and thermal physics program (recently renamed aerothermodynamics). The purpose is to present the elements of, example results from, and rationale and projection for this program. The program is based on improving the fundamental understanding of aerodynamic and aerothermodynamic flow phenomena over hypersonic vehicles in the continuum, transitional, and rarefied flow regimes. Vehicle design capabilities, computational fluid dynamics, computational chemistry, turbulence modeling, aerothermal loads, orbiter flight data analysis, orbiter experiments, laser photodiagnostics, and facilities are discussed.
Clean Air Program : cylinder issues associated with alternative fuels
DOT National Transportation Integrated Search
1999-01-01
A number of incidents of compressed natural gas (CNG) cylinder leaks have occurred while transit buses were either in service or at a bus maintenance facility. This study was initiated to determine the degree to which cylinder problems still exist in...
Solving the 10 Most Common Carpet Problems.
ERIC Educational Resources Information Center
Hilton, Michael
1998-01-01
Identifies the 10 most common carpet problems in school facilities and offers solutions. These include: transition areas, moisture, spot removal, recurring spots, cleaning agents, allergens, wicking, biological contamination, equipment selection, and cleaning methods. Ensuring a successful maintenance program results in satisfactory appearance,…
Hydrazine Catalyst Production: Sustaining S-405 Technology
NASA Technical Reports Server (NTRS)
Wucherer, E. J.; Cook, Timothy; Stiefel, Mark; Humphries, Randy, Jr.; Parker, Janet
2003-01-01
The development of the iridium-based Shell 405 catalyst for spontaneous decomposition of hydrazine was one of the key enabling technologies for today's spacecraft and launch vehicles. To ensure that this crucial technology was not lost when Shell elected to exit the business, Aerojet, supported by NASA, has developed a dedicated catalyst production facility that will supply catalyst for future spacecraft and launch vehicle requirements. We have undertaken a program to transfer catalyst production from Shell Chemical USA (Houston, TX) to Aerojet's Redmond, WA location. This technology transition was aided by Aerojet's 30 years of catalyst manufacturing experience and NASA diligence and support in sustaining essential technologies. The facility has produced and tested S-405 catalyst to existing Shell 405 specifications and standards. Our presentation will describe the technology transition effort including development of the manufacturing facility, capture of the manufacturing process, test equipment validation, initial batch build and final testing.
An analysis of restructuring orientation to enhance nurse retention.
Kiel, Joan M
2012-01-01
The nursing shortage has received much media attention; however, something that contributes to it-nurse turnover-has not received the same attention. Facilities spend time and money to train new employees only to have them leave within a few months. Staff morale, money, time, and quality of care are all affected by nurse turnover. The fact that it often occurs so soon after one takes a position makes it pertinent to look at the process of transition into the new position, namely, the orientation program. This article examines the turnover statistics, costs, rationale, and orientation programs that have proven positive results. It is hoped that the findings can assist health care facilities to replicate successful orientation programs and reduce nurse turnover.
Design considerations and strategies for lunar-based observations
NASA Technical Reports Server (NTRS)
Snoddy, William C.; Nein, Max E.; Hilchey, John D.
1994-01-01
This paper addresses the design considerations and strategies for astrophysical observations as key elements of an international solar system exploration program. Emphasis is placed on the technical and programmatic challenges and opportunities associated with an evolving program of lunar-based astronomy. Both robotic and human tended facilities are discussed ranging from relatively small meter-class transit telescopes to large interferometer and filled-aperture systems.
NASA Technical Reports Server (NTRS)
Willams, M. C.
1985-01-01
Assuring personnel and equipment are fully protected during the Space Shuttle launch and landing operations has been a primary concern of NASA and its associated contractors since the inception of the program. A key factor in support of this policy has been the area access safety training requirements for badging of employees assigned to work on Space Shuttle Launch and Facilities. This requirement was targeted for possible cost savings and the transition of physical on-site walkdowns to the use of television tapes has realized program cost savings while continuing to fully satisfy the area access safety training requirements.
Westhoff, L J; Schaefer, J C
1993-05-01
The Catholic Health Association's 1992 survey of Catholic long-term care (LTC) facilities identified five broad issues LTC facilities face in the 1990s: leadership, system affiliation, community programs, resident issues, and care of persons with AIDS. The transition to lay leadership presents new challenges to the relationship between LTC facilities and their sponsors. Despite the dominance of religious sponsors, an increasing number of laypersons are serving as healthcare administrators both in long-term and acute care. Thirty percent of respondents reported being affiliated with a multi-institutional system. This percentage has changed little in the past few years, although the number of facilities that are system members continues to increase at the fastest rate of any type of LTC facility. Only 27 percent of survey respondents said they provide educational or informational programs for persons in their communities. Thirty-nine percent of system-affiliated LTC facilities reported offering such programs. One encouraging finding shows that 80 percent of facilities have written policies for living wills, 64 percent for designated proxy, and 86 percent for durable power of attorney for healthcare. LTC providers are struggling to determine their role in caring for persons with HIV and AIDS. Only 3.6 percent of respondents care for residents with AIDS. A major problem LTC administrators face is a fear of potential infection of staff or residents.
NASA Astrophysics Data System (ADS)
Knudson, Christa K.; Kemp, Michael C.; Lombardo, Nicholas J.
2009-05-01
The U.S. Department of Homeland Security's Standoff Technology Integration and Demonstration Program is designed to accelerate the development and integration of technologies, concepts of operations, and training to defeat explosives attacks at large public events and mass transit facilities. The program will address threats posed by suicide bombers, vehicle-borne improvised explosive devices, and leave-behind bombs. The program is focused on developing and testing explosives countermeasure architectures using commercial off-the-shelf and near-commercial standoff and remotely operated detection technologies in prototypic operational environments. An important part of the program is the integration of multiple technologies and systems to protect against a wider range of threats, improve countermeasure performance, increase the distance from the venue at which screening is conducted, and reduce staffing requirements. The program will routinely conduct tests in public venues involving successively more advanced technology, higher levels of system integration, and more complex scenarios. This paper describes the initial field test of an integrated countermeasure system that included infrared, millimeter-wave, and video analytics technologies for detecting person-borne improvised explosive devices at a public arena. The test results are being used to develop a concept for the next generation of integrated countermeasures, to refine technical and operational requirements for architectures and technologies, and engage industry and academia in solution development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knudson, Christa K.; Kemp, Michael C.; Lombardo, Nicholas J.
The Department of Homeland Security’s Standoff Technology Integration and Demonstration Program is designed to accelerate the development and integration of technologies, concepts of operations, and training to prevent explosives attacks at large public events and mass transit facilities. The program will address threats posed by suicide bombers, vehicle-borne improvised explosive devices, and leave-behind bombs. The program is focused on developing and testing explosives countermeasure architectures using commercial off-the-shelf and near-commercial standoff and remotely operated detection technologies in prototypic operational environments. An important part of the program is the integration of multiple technologies and systems to protect against a wider rangemore » of threats, improve countermeasure performance, increase the distance from the venue at which screening is conducted, and reduce staffing requirements. The program will routinely conduct tests in public venues involving successively more advanced technology, higher levels of system integration, and more complex scenarios. This paper describes the initial field test of an integrated countermeasure system that included infrared, millimeter-wave, and video analytics technologies for detecting person-borne improvised explosive devices at a public arena. The test results are being used to develop a concept for the next generation of integrated countermeasures, to refine technical and operational requirements for architectures and technologies, and engage industry and academia in solution development.« less
42 CFR 412.426 - Transition period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Services of Inpatient Psychiatric Facilities § 412.426 Transition period. (a) Duration of transition period... psychiatric facility receives a payment comprised of a blend of the estimated Federal per diem payment amount... new inpatient psychiatric facilities. New inpatient psychiatric facilities, are facilities that under...
Self-Sufficiency for Single-Parent Families: An Integrated Approach.
ERIC Educational Resources Information Center
Townley, Kim F.; And Others
1991-01-01
At the One-Parent Family Facility in Lexington, Kentucky, government agencies, businesses, and the university provide integrated services to meet single-parent needs. The residential, transitional living/learning program offers child development and nutrition instruction, health screening, vocational counseling, and educational planning. (SK)
75 FR 74134 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... public agencies, private companies engaged in public transportation, or private non-profit organizations... public transportation bus fleet, infrastructure, and equipment in a state of good repair. Grantees... DEPARTMENT OF TRANSPORTATION Federal Transit Administration State of Good Repair Bus and Bus...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... VTCLI supports the Obama Administration's priority of supporting America's veterans and military... Living Initiative Competitive Grant Program Funds: Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces the selection of projects...
2012-02-03
CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians begin to open space shuttle Endeavour’s payload bay doors in order to retract an antenna. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians prepare to open space shuttle Endeavour’s payload bay doors in order to retract an antenna. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-02-03
CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors has been fully opened and an antenna has been retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
Perspectives of Post-Acute Transition of Care for Cardiac Surgery Patients
Stoicea, Nicoleta; You, Tian; Eiterman, Andrew; Hartwell, Clifton; Davila, Victor; Marjoribanks, Stephen; Florescu, Cristina; Bergese, Sergio Daniel; Rogers, Barbara
2017-01-01
Post-acute care (PAC) facilities improve patient recovery, as measured by activities of daily living, rehabilitation, hospital readmission, and survival rates. Seamless transitions between discharge and PAC settings continue to be challenges that hamper patient outcomes, specifically problems with effective communication and coordination between hospitals and PAC facilities at patient discharge, patient adherence and access to cardiac rehabilitation (CR) services, caregiver burden, and the financial impact of care. The objective of this review is to examine existing models of cardiac transitional care, identify major challenges and social factors that affect PAC, and analyze the impact of current transitional care efforts and strategies implemented to improve health outcomes in this patient population. We intend to discuss successful methods to address the following aspects: hospital-PAC linkages, improved discharge planning, caregiver burden, and CR access and utilization through patient-centered programs. Regular home visits by healthcare providers result in decreased hospital readmission rates for patients utilizing home healthcare while improved hospital-PAC linkages reduced hospital readmissions by 25%. We conclude that widespread adoption of improvements in transitional care will play a key role in patient recovery and decrease hospital readmission, morbidity, and mortality. PMID:29230400
Perspectives of Post-Acute Transition of Care for Cardiac Surgery Patients.
Stoicea, Nicoleta; You, Tian; Eiterman, Andrew; Hartwell, Clifton; Davila, Victor; Marjoribanks, Stephen; Florescu, Cristina; Bergese, Sergio Daniel; Rogers, Barbara
2017-01-01
Post-acute care (PAC) facilities improve patient recovery, as measured by activities of daily living, rehabilitation, hospital readmission, and survival rates. Seamless transitions between discharge and PAC settings continue to be challenges that hamper patient outcomes, specifically problems with effective communication and coordination between hospitals and PAC facilities at patient discharge, patient adherence and access to cardiac rehabilitation (CR) services, caregiver burden, and the financial impact of care. The objective of this review is to examine existing models of cardiac transitional care, identify major challenges and social factors that affect PAC, and analyze the impact of current transitional care efforts and strategies implemented to improve health outcomes in this patient population. We intend to discuss successful methods to address the following aspects: hospital-PAC linkages, improved discharge planning, caregiver burden, and CR access and utilization through patient-centered programs. Regular home visits by healthcare providers result in decreased hospital readmission rates for patients utilizing home healthcare while improved hospital-PAC linkages reduced hospital readmissions by 25%. We conclude that widespread adoption of improvements in transitional care will play a key role in patient recovery and decrease hospital readmission, morbidity, and mortality.
76 FR 68819 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... that are public agencies, private companies engaged in public transportation, or private non-profit... Table 1 will provide funds to help maintain the nation's public transportation bus fleet, infrastructure... DEPARTMENT OF TRANSPORTATION Federal Transit Administration State of Good Repair Bus and Bus...
Increasing Registered Nurse Retention Using Mentors in Critical Care Services.
Schroyer, Coreena C; Zellers, Rebecca; Abraham, Sam
2016-01-01
Recruiting and training 1 newly hired registered nurse can cost thousands of dollars. With a high percentage of these newly hired nurses leaving their first place of employment within their first year, the financial implications may be enormous. It is imperative that health care facilities invest in recruiting and retention programs that retain high-quality nurses. Mentorship programs in retaining and easing the transition to practice for new graduate nurses, re-entry nurses, and nurses new to a specialty area are critical in nurse retention. Discussion in this study includes the effect of implementing a mentor program into the critical care services area of a 325-bed not-for-profit community hospital in northern Indiana. Based on this study, nurses with a mentor were retained at a 25% higher rate than those not mentored. Implementation of a mentor program reduced the training cost to the facility and increased retention and morale.
Initial Efficacy of a Cardiac Rehabilitation Transition Program: Cardiac TRUST
Zullo, Melissa; Boxer, Rebecca; Moore, Shirley M.
2012-01-01
Patients recovering from cardiac events are increasingly using postacute care, such as home health care and skilled nursing facility services. The purpose of this pilot study was to test the initial efficacy, feasibility, and safety of a specially designed postacute care transitional rehabilitation intervention for cardiac patients. Cardiac Transitional Rehabilitation Using Self- Management Techniques (Cardiac TRUST) is a family-focused intervention that includes progressive low-intensity walking and education in self-management skills to facilitate recovery following a cardiac event. Using a randomized two-group design, exercise self-efficacy, steps walked, and participation in an outpatient cardiac rehabilitation program were compared in a sample of 38 older adults; 17 who received the Cardiac TRUST program and 21 who received usual care only. At discharge from postacute care, the intervention group had a trend for higher levels of self-efficacy for exercise outcomes (X=39.1, SD=7.4) than the usual care group (X=34.5; SD=7.0) (t-test 1.9, p=.06). During the 6 weeks following discharge, compared with the usual care group, the intervention group had more attendance in out-patient cardiac rehabilitation (33% compared to 11.8%, F=7.1, p=.03) and a trend toward more steps walked during the first week (X=1,307, SD=652 compared to X=782, SD=544, t-test 1.8, p=.07). The feasibility of the intervention was better for the home health participants than for those in the skilled nursing facility and there were no safety concerns. The provision of cardiac-focused rehabilitation during postacute care has the potential to bridge the gap in transitional services from hospitalization to outpatient cardiac rehabilitation for these patients at high risk for future cardiac events. Further evidence of the efficacy of Cardiac TRUST is warranted. PMID:22084960
Cabana Multi-User Spaceport Tour/CRS-10
2017-02-17
Robert Cabana, director of NASA’s Kennedy Space Center, accompanied news media on Friday, February 17 for a three-part tour of facilities in the Launch Complex 39 area at Kennedy. Media received an update on the transition of government facilities to the aerospace industry, and how that approach enables NASA and industry success. The tour included the Vehicle Assembly Building, where extensive work is being completed to prepare not only for NASA’s Space Launch System, but also enables members of the aerospace industry to use the facility between NASA missions. The tour completed at Boeing’s Commercial Crew and Cargo Processing Facility, previously a shuttle processing facility, where the company is manufacturing its Starliner spacecraft for flight tests and ultimately crew rotation missions with NASA’s Commercial Crew Program.
Space Shuttle Strategic Planning Status
NASA Technical Reports Server (NTRS)
Henderson, Edward M.; Norbraten, Gordon L.
2006-01-01
The Space Shuttle Program is aggressively planning the Space Shuttle manifest for assembling the International Space Station and servicing the Hubble Space Telescope. Implementing this flight manifest while concurrently transitioning to the Exploration architecture creates formidable challenges; the most notable of which is retaining critical skills within the Shuttle Program workforce. The Program must define a strategy that will allow safe and efficient fly-out of the Shuttle, while smoothly transitioning Shuttle assets (both human and facility) to support early flight demonstrations required in the development of NASA s Crew Exploration Vehicle (CEV) and Crew and Cargo Launch Vehicles (CLV). The Program must accomplish all of this while maintaining the current level of resources. Therefore, it will be necessary to initiate major changes in operations and contracting. Overcoming these challenges will be essential for NASA to fly the Shuttle safely, accomplish the President s "Vision for Space Exploration," and ultimately meet the national goal of maintaining a robust space program. This paper will address the Space Shuttle Program s strategy and its current status in meeting these challenges.
Space Shuttle Strategic Planning Status
NASA Technical Reports Server (NTRS)
Norbraten, Gordon L.; Henderson, Edward M.
2007-01-01
The Space Shuttle Program is aggressively flying the Space Shuttle manifest for assembling the International Space Station and servicing the Hubble Space Telescope. Completing this flight manifest while concurrently transitioning to the Exploration architecture creates formidable challenges; the most notable of which is retaining critical skills within the Shuttle Program workforce. The Program must define a strategy that will allow safe and efficient fly-out of the Shuttle, while smoothly transitioning Shuttle assets (both human and facility) to support early flight demonstrations required in the development of NASA's Crew Exploration Vehicle (Orion) and Crew and Cargo Launch Vehicles (Ares I). The Program must accomplish all of this while maintaining the current level of resources. Therefore, it will be necessary to initiate major changes in operations and contracting. Overcoming these challenges will be essential for NASA to fly the Shuttle safely, accomplish the Vision for Space Exploration, and ultimately meet the national goal of maintaining a robust space program. This paper will address the Space Shuttle Program s strategy and its current status in meeting these challenges.
Varnell, Gayle; Haas, Barbara; Duke, Gloria; Hudson, Kathy
2008-01-01
Transitioning to an evidence-based practice (EBP) environment is a new and often overwhelming challenge for many organisations. The most effective strategies to implement EBP have yet to be determined. In this study an accelerated development EBP program, which was administered to nurses from five hospitals was evaluated. At each hospital, nurses were selected as an "EBP champion" whose role would be to help facilitate the transition within that organisation. The purpose of this study was to evaluate the effectiveness of an accelerated educational program on the attitudes toward and implementation of EBP among nurses employed in acute-care facilities. Forty-nine nurses from five acute-care facilities participated in an 8-week program to develop into EBP champions. Participants attended a 2-hour class each week conducted by four faculty members of a local university. Pre- and post-test mean scores of the EBP barriers (EBPB) and EBP implementation (EBPI) scales were compared using paired t tests to determine the effect of the accelerated development program. Respondents reported higher scores on both the beliefs and implementation scales at the end of the program. Paired t tests indicated a significant difference in means for both the EBPB (p < .01) and EBPI (p < .01). Nurses who attend an accelerated educational program have the potential to significantly improve beliefs and attitudes about EBP. Administrative support and collaboration between academia and service are essential for successful intervention.
Glick, Bethany; Kamboj, Manmohan K.
2017-01-01
Planning for the transition from pediatric to adult healthcare is broadly understood to be beneficial to the quality of care of patients with chronic illness. Due to the level of self-care that is necessary in the maintenance of most chronic diseases, it is important that pediatric settings can offer support during a time when adolescents are beginning to take more responsibility in all areas of their lives. Lack of supportive resources for adolescents with chronic conditions often results in both decreased access to care and impaired health and function likely leading to increased medical costs later. Additionally, fundamental differences in health care delivery exist between pediatric and adult care settings. There is limited empiric data and information on best practices in transition care. In this article we address the importance of bridging pediatric and adult care settings and highlight the challenges and successes of the implementation of the young adult transition clinic program for patients with type 1 diabetes at our facility. We provide recommendations for further research and program implementation with the transition population. PMID:29184818
NASA Astrophysics Data System (ADS)
Swift, Jonathan J.; Bottom, Michael; Johnson, John A.; Wright, Jason T.; McCrady, Nate; Wittenmyer, Robert A.; Plavchan, Peter; Riddle, Reed; Muirhead, Philip S.; Herzig, Erich; Myles, Justin; Blake, Cullen H.; Eastman, Jason; Beatty, Thomas G.; Barnes, Stuart I.; Gibson, Steven R.; Lin, Brian; Zhao, Ming; Gardner, Paul; Falco, Emilio; Criswell, Stephen; Nava, Chantanelle; Robinson, Connor; Sliski, David H.; Hedrick, Richard; Ivarsen, Kevin; Hjelstrom, Annie; de Vera, Jon; Szentgyorgyi, Andrew
2015-04-01
The Miniature Exoplanet Radial Velocity Array (MINERVA) is a U.S.-based observational facility dedicated to the discovery and characterization of exoplanets around a nearby sample of bright stars. MINERVA employs a robotic array of four 0.7-m telescopes outfitted for both high-resolution spectroscopy and photometry, and is designed for completely autonomous operation. The primary science program is a dedicated radial velocity survey and the secondary science objective is to obtain high-precision transit light curves. The modular design of the facility and the flexibility of our hardware allows for both science programs to be pursued simultaneously, while the robotic control software provides a robust and efficient means to carry out nightly observations. We describe the design of MINERVA, including major hardware components, software, and science goals. The telescopes and photometry cameras are characterized at our test facility on the Caltech campus in Pasadena, California, and their on-sky performance is validated. The design and simulated performance of the spectrograph is briefly discussed as we await its completion. New observations from our test facility demonstrate sub-mmag photometric precision of one of our radial velocity survey targets, and we present new transit observations and fits of WASP-52b-a known hot-Jupiter with an inflated radius and misaligned orbit. The process of relocating the MINERVA hardware to its final destination at the Fred Lawrence Whipple Observatory in southern Arizona has begun, and science operations are expected to commence in 2015.
78 FR 13609 - Environmental Impact and Related Procedures
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... right-of-way and projects receiving limited Federal funding, as described in MAP-21. The Agencies seek... Improvement Program, which specifically include all capital transit projects eligible for funding under... facility eligible for funding under title 23, U.S.C., or chapter 53 of title 49, U.S.C. The geographic area...
ERIC Educational Resources Information Center
McLeer, S.; And Others
Moving children from a psychiatric treatment facility to community schools presents significant challenges for children, teachers, and families. This study examined the potential conflicts between the expectations of receiving teachers and the behaviors of elementary school students (N=17) using the Assessments for Integration into Mainstream…
2012-02-03
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a technician monitors the progress as one of space shuttle Endeavour’s payload bay doors is opened so that an antenna can be retracted. Space Shuttle Program transition and retirement work continues on Discovery and Endeavour in the orbiter processing facilities, while shuttle Atlantis is in temporary storage in high bay 4 of the Vehicle Assembly Building. Endeavour is being prepared for display at the California Science Center in Los Angeles. Photo credit: NASA/Kim Shiflett
2012-09-16
CAPE CANAVERAL, Fla. – An overview of the cockpit of NASA's Shuttle Carrier Aircraft, or SCA, is captured for posterity at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida before the aircraft is decommissioned. The SCA, a modified 747 jetliner, will fly space shuttle Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis
2012-09-16
CAPE CANAVERAL, Fla. – An overview of the cockpit of NASA's Shuttle Carrier Aircraft, or SCA, is captured for posterity at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida before the aircraft is decommissioned. The SCA, a modified 747 jetliner, will fly space shuttle Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis
Schoenborn, Nancy L.; Christmas, Colleen
2013-01-01
Background Care transitions are common and highly vulnerable times during illness. Physicians need better training to improve care transitions. Existing transitional care curricula infrequently involve settings outside of the hospital or other health care disciplines. Intervention We created a curriculum to teach internal medicine residents how to provide better transitional care at hospital discharge through experiential, interdisciplinary learning in different care settings outside of the acute hospital, and we engaged other health care disciplines frequently involved in care transitions. Setting/Participants Nineteen postgraduate year-1 internal medicine trainees at an academic medical center in an urban location completed experiences in a postacute care facility, home health care, and outpatient clinics. Program Description The 2-week required curriculum involved teachers from geriatric medicine; physical, occupational, and speech therapy; and home health care, with both didactic and experiential components and self-reflective exercises. Program Evaluation The curriculum was highly rated (6.86 on a 9-point scale) and was associated with a significant increase in the rating of the overall quality of transitional care education (from 4.09 on a 5-point scale in 2011 to 4.53 in 2012) on the annual residency program survey. Learners reported improved knowledge in key curricular areas and that they would change practice as a result of the curriculum. Conclusions Our transitional care curriculum for internal medicine residents provides exposure to care settings and health care disciplines that patients frequently encounter. The curriculum has shown positive, short-term effects on learners' perceived knowledge and behavior. PMID:24455024
Barry, Catherine N; Abraham, Kristen M; Weaver, Kendra R; Bowersox, Nicholas W
2016-05-01
In the past decade, the demand for Veterans Health Administration (VHA) mental health care has increased rapidly. In response to the increased demand, the VHA developed the Behavioral Health Interdisciplinary Program (BHIP) team model as an innovative approach to transform VHA general outpatient mental health delivery. The present formative evaluation gathered information about pilot implementation of BHIP to understand the struggles and successes that staff experienced during facility transitions to the BHIP model. Using a purposive, nonrandom sampling approach, we conducted 1-on-1, semistructured interviews with 37 licensed and nonlicensed clinical providers and 13 clerical support staff assigned to BHIP teams in 21 facilities across the VHA. Interviews revealed that having actively involved facility mental health leaders, obtaining adequate staffing for teams to meet the requirements of the BHIP model, creating clear descriptions and expectations for team member roles within the BHIP framework, and allocating designated time for BHIP team meetings challenged many VHA sites but are crucial for successful BHIP implementation. Despite the challenges, staff reported that the transition to BHIP improved team work and improved patient care. Staff specifically highlighted the potential for the BHIP model to improve staff working relationships and enhance communication, collaboration, morale, and veteran treatment consistency. Future evaluations of the BHIP implementation process and BHIP team functioning focusing on patient outcomes, organizational outcomes, and staff functioning are recommended for fully understanding effects of transitioning to the BHIP model within VHA general mental health clinics and to identify best practices and areas for improvement. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?
Code of Federal Regulations, 2014 CFR
2014-04-01
...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...
20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?
Code of Federal Regulations, 2013 CFR
2013-04-01
...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...
20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?
Code of Federal Regulations, 2012 CFR
2012-04-01
...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...
ERIC Educational Resources Information Center
Riemer, Frances J.
1997-01-01
Examines a work initiative that moved welfare recipients into jobs as nurse assistants at a geriatric facility. The women's stories describe a welfare-to-work program in practice and illustrate how and why earnest efforts to mediate poverty resulted instead in the continued marginalization and stigmatization of poor people. (RJM)
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
Landlord project multi-year program plan, fiscal year 1999, WBS 1.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dallas, M.D.
The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less
Baldwin, Kathleen M; Black, Denice; Hammond, Sheri
2014-01-01
This quality improvement project developed a community nursing case management program to decrease preventable readmissions to the hospital and emergency department by providing telephonic case management and, if needed, onsite assessment and treatment by a clinical nurse specialist (CNS) with prescriptive authority. As more people reach Medicare age, the number of individuals with worsening chronic diseases with dramatically increases unless appropriate disease management programs are developed. Care transitions can result in breakdown in continuity of care, resulting in increased preventable readmissions, particularly for indigent patients. The CNS is uniquely educated to managing care transitions and coordination of community resources to prevent readmissions. After a thorough SWOT (strengths, weaknesses, opportunities, and threats) analysis, we developed and implemented a cost-avoidance model to prevent readmissions in our uninsured and underinsured patients. The project CNS used a wide array of interventions to decrease readmissions. In the last 2 years, there have been a total of 22 less than 30-day readmissions to the emergency department or hospital in 13 patients, a significant decrease from readmissions in these patients prior to the program. Three of them required transfer to a larger hospital for a higher level of care. Using advanced practice nurses in transitional care can prevent readmissions, resulting in cost avoidance. The coordination of community resources during transition from hospital to home is a job best suited to CNSs, because they are educated to work within organizations/systems. The money we saved with this project more than justified the cost of hiring a CNS to lead it. More research is needed into this technology. Guidelines for this intervention need to be developed. Replicating our cost-avoidance transitional care model can help other facilities limit that loss.
Identifying Critical Manufacturing Technologies Required for Transforming the Army Industrial Base
2014-04-01
mechanism, 1 = least common mechanism)? ................................................................... 29 Figure 5 – Which Technology “ Test Beds...facilities, produce new designs , and incorporate efficient manufacturing processes. The value and continued success of the Army Industrial Base depends on...in materiel supplies to troops. Specific programs, described in AR 700-09, that are designed to transition manufacturing technology into the Army
M Dwarf Flares: Exoplanet Detection Implications
NASA Astrophysics Data System (ADS)
Tofflemire, B. M.; Wisniewski, J. P.; Hilton, E. J.; Kowalski, A. F.; Kundurthy, P.; Schmidt, S. J.; Hawley, S. L.; Holtzman, J. A.
2011-12-01
Low mass stars such as M dwarfs have become prime targets for exoplanet transit searches as their low luminosities and small stellar radii could enable the detection of super-Earths residing in their habitable zones. While promising transit targets, M dwarfs are also inherently variable and can exhibit up to ˜6 magnitude flux enhancements in the optical U-band. This is significantly higher than the predicted transit depths of habitable zone super-Earths (0.005 magnitude flux decrease). The behavior of flares at infrared (IR) wavelengths, particularly those likely to be used to study and characterize M dwarf exoplanets using facilities such as the James Web Space Telescope (JWST), remains largely unknown. To address these uncertainties, we are executing a coordinated, contemporaneous monitoring program of the optical and IR flux of M dwarfs known to regularly flare. A suite of telescopes located at the Kitt Peak National Observatory and the Apache Point Observatory are used for the observations. We present the initial results of this program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... motor vehicle for transportation between places of employment and mass transit facilities? 102-34.210... of employment and mass transit facilities? Yes, you may use a Government motor vehicle for transportation between places of employment and mass transit facilities under the following conditions: (a) The...
NASA Astrophysics Data System (ADS)
Cordova, Martin; Serio, Andrew; Meza, Francisco; Arriagada, Gustavo; Swett, Hector; Ball, Jesse; Collins, Paul; Masuda, Neal; Fuentes, Javier
2016-07-01
In 2014 Gemini Observatory started the base facility operations (BFO) project. The project's goal was to provide the ability to operate the two Gemini telescopes from their base facilities (respectively Hilo, HI at Gemini North, and La Serena, Chile at Gemini South). BFO was identified as a key project for Gemini's transition program, as it created an opportunity to reduce operational costs. In November 2015, the Gemini North telescope started operating from the base facility in Hilo, Hawaii. In order to provide the remote operator the tools to work from the base, many of the activities that were normally performed by the night staff at the summit were replaced with new systems and tools. This paper describes some of the key systems and tools implemented for environmental monitoring, and the design used in the implementation at the Gemini North telescope.
Supporting nurses' transition to rural healthcare environments through mentorship.
Rohatinsky, Noelle K; Jahner, Sharleen
2016-01-01
The global shortage of rural healthcare professionals threatens the access these communities have to adequate healthcare resources. Barriers to recruitment and retention of nurses in rural facilities include limited resources, professional development opportunities, and interpersonal ties to the area. Mentorship programs have been used to successfully recruit and retain rural nurses. This study aimed to explore (i) employee perceptions of mentorship in rural healthcare organizations, (ii) the processes involved in creating mentoring relationships in rural healthcare organizations, and (iii) the organizational features supporting and inhibiting mentorship in rural healthcare organizations. This study was conducted in one rural health region in Saskatchewan, Canada. Volunteer participants who were employed at one rural healthcare facility were interviewed. A semi-structured interview guide that focused on exploring and gaining an understanding of participants' perceptions of mentorship in rural communities was employed. Data were analyzed using interpretive description methodology, which places high value on participants' subjective perspective and knowledge of their experience. All seven participants were female and employed as registered nurses or licensed practical nurses. Participants recognized that the rural environment offered unique challenges and opportunities for the transition of nurses new to rural healthcare. Participants believed mentorships facilitated this transition and were vital to the personal and professional success of new employees. Specifically, their insights indicated that this transition was influenced by three factors: rural community influences, organizational influences, and mentorship program influences. Facilitators for mentorships hinged on the close working relationships that facilitated the development of trust. Barriers to mentorship included low staff numbers, limited selection of volunteer mentors, and lack of mentorship education. The rural community context clearly presents challenges for the transition of nurses. Participants described mentorship as a vital component to personal and professional success of new employees in rural areas. The findings of this qualitative exploratory study inform the development of creative and supportive ways to establish mentorships to address the challenges specifically associated with integration of nurses into rural practice.
NASA Technical Reports Server (NTRS)
Wiley, Lowell F.
1985-01-01
The study results from the conceptual design and programmatics segment of the Space Platform and Station Accommodation for Life Sciences Research Facilities. The results and significant findings of the conceptual design and programmatics were generated by these tasks: (1) the review and update engineering and science requirements; (2) analysis of life sciences mission transition scenario; (3) the review and update of key trade issues; (4) the development of conceptual definition and designs; and (5) the development of the work breakdown schedule and its dictionary, program schedule, and estimated costs.
NASA Technical Reports Server (NTRS)
Howe, G.; Saunders, D.
1983-01-01
Users of the CDC 7600 at Ames are assisted in making the transition to the CRAY-1. Similarities and differences in the basic JCL are summarized, and a dozen or so examples of typical batch jobs for the two systems are shown in parallel. Some changes to look for in FORTRAN programs and in the use of UPDATE are also indicated. No attempt is made to cover magnetic tape handling. The material here should not be considered a substitute for reading the more conventional manuals or the User's Guide for the Advanced Computational Facility, available from the Computer Information Center.
González, Florencia; Rodríguez Celin, María de Las Mercedes; Roizen, Mariana; Mato, Roberto; García Arrigoni, Patricia; Ugo, Florencia; Staciuk, Raquel; Fano, Virginia
2017-12-01
The shift of adolescents from a pediatric to an adult health care facility is a complex process. The objective of this study was to assess the transition/transfer process for adolescents with chronic diseases at Hospital Garrahan. Observational, cross-sectional, qualitative-quantitative study. Retrospective statistical data were obtained in relation to outpatient visits of patients aged 16-26; surveys and/or interviews were done with health care providers, adolescents, and family members from different follow-up programs. The prevalence of care provided to individuals older than 16 years was 7.2%. Surveys were administered to 54 attending health care providers, 150 patients (16-26.7 years old) and 141 family members. In addition, 45 health care providers with management functions were interviewed. Health care providers: 39% had received training on transition. All identified barriers and facilitators among the different participants and facilities. They recognized the importance of encouraging autonomy among their patients, but only 30% of them interviewed their patients alone, and 56.6% delivered medical reports. Strategies: the median age of transfer was 18 years (13-20); 62% had a protocol; 84% had an informal agreement with another facility; joint or parallel care: 49%; only 20% implemented a transition plan. Patients and family members: 4.7% of adolescents attended visits alone, and health care providers had asked 45% about their autonomy and preparation to take care of their health. Adolescents and their parents had feelings (mostly negative) regarding the process and identified facilitation strategies, such as receiving a summary, knowing the new facility, and having trained health care providers. The transition process for adolescents with chronic diseases is still deficient and approaching it involves health care teams and the families. A lack of formal inter-institutional agreements was identified, although there were more informal agreements among health care providers; besides, the need to encourage chronically-ill patients' autonomy was also determined. In relation to facilitation strategies, patients and parents mainly recognized the need to have a medical summary, health care guidelines, and trust in the new provider. Sociedad Argentina de Pediatría
2007-01-30
KENNEDY SPACE CENTER, FLA. -- Representatives from NASA, Lockheed Martin, Space Florida and the state of Florida are seated on stage at a ceremony to commemorate the transition of the historic Operations and Checkout (O&C) Building high bay for use by the Constellation Program. From left are Cleon Lacefield, Lockheed Martin program manager; Thad Altman, representative of the State of Florida; Bill Parsons, Kennedy Space Center director; Steve Koller, executive director of Space Florida; and Skip Hatfield, Orion Project manager. Representatives from NASA, Lockheed Martin, Space Florida and the state of Florida are seated on stage at a ceremony to commemorate the transition of the historic Operations and Checkout (O&C) Building high bay for use by the Constellation Program. From left are Cleon Lacefield, Lockheed Martin program manager; Thad Altman, representative of the State of Florida; Bill Parsons, Kennedy Space Center director; Steve Koller, executive director of Space Florida; and Skip Hatfield, Orion Project manager. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Study of the impact of automation on productivity in bus-maintenance facilities. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sumanth, D.J.; Weiss, H.J.; Adya, B.
1988-12-01
Whether or not the various types of automation and new technologies introduced in a bus-transit system really have an impact on productivity is the question addressed in the study. The report describes a new procedure of productivity measurement and evaluation for a county-transit system and provides an objective perspective on the impact of automation on productivity in bus maintenance facilities. The research objectives were: to study the impact of automation on total productivity in transit maintenance facilities; to develop and apply a methodology for measuring the total productivity of a Floridian transit maintenance facility (Bradenton-Manatee County bus maintenance facility whichmore » has been introducing automation since 1983); and to develop a practical step-by-step implementation scheme for the total productivity-based productivity measurement system that any bus manager can use. All 3 objectives were successfully accomplished.« less
Commerce Lab - An enabling facility and test bed for commercial flight opportunities
NASA Technical Reports Server (NTRS)
Robertson, Jack; Atkins, Harry L.; Williams, John R.
1986-01-01
Commerce Lab is conceived as an adjunct to the National Space Transportation System (NSTS) by providing a focal point for commercial missions which could utilize existing NSTS carrier and resource capabilities for on-orbit experimentation in the microgravity sciences. In this context, the Commerce Lab provides an enabling facility and test bed for commercial flight opportunities. Commerce Lab program activities to date have focused on mission planning for private sector involvement in the space program to facilitate the commercial exploitation of the microgravity environment for materials processing research and development. It is expected that Commerce Lab will provide a logical transition between currently planned NSTS missions and future microgravity science and commercial R&D missions centered around the Space Station. The present study identifies candidate Commerce Lab flight experiments and their development status and projects a mission traffic model that can be used in commercial mission planning.
Characterization, monitoring, and sensor technology crosscutting program: Technology summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-06-01
The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the Office of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60). The technology development must also be cost effective and appropriate to EM-30/40/60 needs. Furthermore, the required technologies must be delivered and implemented when needed. Accordingly, and to ensure that available DOE and other national resources are focused an the most pressing needs, management of the technology development is concentrated on the following Focus Areas: Contaminant Plumemore » Containment and Remediation (PFA); Landfill Stabilization (LSFA); High-Level Waste Tank Remediation (TFA); Mixed Waste Characterization, Treatment, and Disposal (MWFA); and Facility Deactivation, Decommissioning, and Material Disposition (FDDMDFA). Brief descriptions of CMST-CP projects funded in FY95 are presented.« less
Summary of Rocketdyne Engine A5 Rocket Based Combined Cycle Testing
NASA Technical Reports Server (NTRS)
Ketchum. A.; Emanuel, Mark; Cramer, John
1998-01-01
Rocketdyne Propulsion and Power (RPP) has completed a highly successful experimental test program of an advanced rocket based combined cycle (RBCC) propulsion system. The test program was conducted as part of the Advanced Reusable Technology program directed by NASA-MSFC to demonstrate technologies for low-cost access to space. Testing was conducted in the new GASL Flight Acceleration Simulation Test (FAST) facility at sea level (Mach 0), Mach 3.0 - 4.0, and vacuum flight conditions. Significant achievements obtained during the test program include 1) demonstration of engine operation in air-augmented rocket mode (AAR), ramjet mode and rocket mode and 2) smooth transition from AAR to ramjet mode operation. Testing in the fourth mode (scramjet) is scheduled for November 1998.
Spitzer's window onto the evolution of young planets
NASA Astrophysics Data System (ADS)
Newton, Elisabeth; Mann, Andrew; Rizzuto, Aaron; Vanderburg, Andrew
2018-05-01
Exoplanets in young associations provide an otherwise inaccessible window into how planetary systems form and evolve. We expect to discover 19 young exoplanets around bright stars through our TESS GI programs, which will provide a critical data set for studying planet formation and evolution into the next decade. Here, we propose to obtain transit observations of these young planets with Spitzer. We seek to use Spitzer because it enables us is to obtain precise photometric observations at wavelengths that will also mitigate the impact of stellar activity, which is expected to be high for these young stars. Using data from Spitzer, we will directly address two questions: how do the atmospheres of sub-Neptune sized planets evolve? And what is the mechanism by which planets migrate onto short orbits? We will do this by measuring minimum eccentricities via the photoeccentric effect and by accurately and precisely constraining the planetary properties. We will additionally improve transit ephemerides, ensuring that the transits of these planets are not lost as the community prepares for future observations with JWST, HST, and ground-based facilities. This is a target of opportunity program.
Wind Tunnel Test Technique and Instrumentation Development at LaRC
NASA Technical Reports Server (NTRS)
Putnam, Lawrence E.
1999-01-01
LaRC has an aggressive test technique development program underway. This program has been developed using 3rd Generation R&D management techniques and is a closely coordinated program between suppliers and wind tunnel operators- wind tunnel customers' informal input relative to their needs has been an essential ingredient in developing the research portfolio. An attempt has been made to balance this portfolio to meet near term and long term test technique needs. Major efforts are underway to develop techniques for determining model wing twist and location of boundary layer transition in the NTF (National Transonic Facility). The foundation of all new instrumentation developments, procurements, and upgrades will be based on uncertainty analysis.
2014-08-05
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2015. In addition, it adopts the most recent Office of Management and Budget (OMB) statistical area delineations to identify a facility's urban or rural status for the purpose of determining which set of rate tables will apply to the facility, and to determine the SNF PPS wage index including a 1-year transition with a blended wage index for all providers for FY 2015. This final rule also contains a revision to policies related to the Change of Therapy (COT) Other Medicare Required Assessment (OMRA). This final rule includes a discussion of a provision related to the Affordable Care Act involving Civil Money Penalties. Finally, this final rule discusses the SNF therapy payment research currently underway within CMS, observed trends related to therapy utilization among SNF providers, and the agency's commitment to accelerating health information exchange in SNFs.
Flight experience with lightweight, low-power miniaturized instrumentation systems
NASA Technical Reports Server (NTRS)
Hamory, Philip J.; Murray, James E.
1992-01-01
Engineers at the NASA Dryden Flight Research Facility (NASA-Dryden) have conducted two flight research programs with lightweight, low-power miniaturized instrumentation systems built around commercial data loggers. One program quantified the performance of a radio-controlled model airplane. The other program was a laminar boundary-layer transition experiment on a manned sailplane. The purpose of this paper is to report NASA-Dryden personnel's flight experience with the miniaturized instrumentation systems used on these two programs. The paper will describe the data loggers, the sensors, and the hardware and software developed to complete the systems. The paper also describes how the systems were used and covers the challenges encountered to make them work. Examples of raw data and derived results will be shown as well. Finally, future plans for these systems will be discussed.
Assessment of the National Transonic Facility for Laminar Flow Testing
NASA Technical Reports Server (NTRS)
Crouch, Jeffrey D.; Sutanto, Mary I.; Witkowski, David P.; Watkins, A. Neal; Rivers, Melissa B.; Campbell, Richard L.
2010-01-01
A transonic wing, designed to accentuate key transition physics, is tested at cryogenic conditions at the National Transonic Facility at NASA Langley. The collaborative test between Boeing and NASA is aimed at assessing the facility for high-Reynolds number testing of configurations with significant regions of laminar flow. The test shows a unit Reynolds number upper limit of 26 M/ft for achieving natural transition. At higher Reynolds numbers turbulent wedges emanating from the leading edge bypass the natural transition process and destroy the laminar flow. At lower Reynolds numbers, the transition location is well correlated with the Tollmien-Schlichting-wave N-factor. The low-Reynolds number results suggest that the flow quality is acceptable for laminar flow testing if the loss of laminar flow due to bypass transition can be avoided.
Packel, Lora; Sood, Megha; Gormley, Michelle; Hayden, Rebecca
2013-01-01
Background Cystic fibrosis (CF) is a disease that requires intensive multidisciplinary care, including care by physical therapists (PTs). People with CF are now living well into adulthood, necessitating a transfer of care from the pediatric setting to an adult one. Physical therapists play a large role in the care of the person with CF; however, there is little known about the PT role in transition of care. Purpose To explore transition issues for people with CF from the perspective of PTs. Methods An 18-question online survey was sent to PTs via an electronic CF listserv. Questions were derived from an analysis of transition literature in CF and other chronic childhood conditions. Physical therapists who reported treating people with CF gave their opinions on issues impacting transition from their perspective as well as their perception of patient and parent concerns. Descriptive statistics were used for data analysis. Results A total of 26 PTs completed the survey. A majority, 61.5%, reported that there was a transition program at their facility, with 42.3% involving physical therapy. Common themes for patients and parents included feeling uncertain about: knowledge of the adult physician, acquiring pulmonary infections in the adult setting, and pace of the adult clinic. Physical therapists were concerned about adherence with airway clearance and exercise following transfer to the adult clinic. Conclusions The role of PT in transition programs is quite varied. Physical therapists should address common concerns of their patients and families to improve the transition process and possibly impact adherence to the PT plan of care. PMID:23754936
Patel, Kavita; Boutwell, Amy; Brockmann, Bradley W.; Rich, Josiah D.
2014-01-01
Under the Affordable Care Act, up to thirteen million adults have the opportunity to obtain health insurance through an expansion of the Medicaid program. A great deal of effort is currently being devoted to eligibility verification, outreach, and enrollment. We look beyond these important first-phase challenges to consider what people who are transitioning back to the community after incarceration need to receive effective care. It will be possible to deliver cost-effective, high-quality care to this population only if assistance is coordinated between the correctional facility and the community, and across diverse treatment and support organizations in the community. This article discusses several examples of successful coordination of care for formerly incarcerated people, such as Project Bridge and the Community Partnerships and Supportive Services for HIV-Infected People Leaving Jail (COMPASS) program in Rhode Island and the Transitions Clinic program that operates in ten US cities. To promote broader adoption of successful models, we offer four policy recommendations for overcoming barriers to integrating individuals into sustained, community-based care following their release from incarceration. PMID:24590947
Transitioning to a New Facility: The Crucial Role of Employee Engagement.
Slosberg, Meredith; Nejati, Adeleh; Evans, Jennie; Nanda, Upali
Transitioning to a new facility can be challenging for employees and detrimental to operations. A key aspect of the transition is employee understanding of, and involvement in, the design of the new facility. The literature lacks a comprehensive study of the impact of change engagement throughout the design, construction, and activation of a project as well as how that can affect perceptions, expectations, and, eventually, satisfaction of employees. The purpose of this research was to examine employee perceptions and satisfaction throughout a hospital design, construction, and activation process. Three pulse-point surveys were administered throughout the transition of a children's hospital emergency department and neonatal intensive care unit to a new facility. We also administered a postoccupancy survey 3 months after the move into the new facility. We received 544 responses and analyzed them to assess the relationship between involvement in design or change engagement initiatives and overall perceptions. The results revealed a strong relationship between employee engagement and their level of preparedness to move, readiness to adapt, and satisfaction. Early involvement in the design of a facility or new processes can significantly affect staff preparedness and readiness to adapt as well as employees' overall satisfaction with the building after occupancy. In addition, our findings suggest that keeping a finger on the pulse of employee perceptions and expectations throughout the design, construction, and activation phase is critical to employee preparedness and satisfaction in transitioning to a new facility.
2013-07-19
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, Director Bob Cabana, at right, shakes hands with Larry Williams, president and CEO of Ballistic Recovery Systems Inc., or BRS Aerospace of Miami, Fla., after signing a new partnership agreement for use of the Parachute Refurbishment Facility, or PRF. Under a 10-year lease agreement, BRS Aerospace will operate and maintain the facility. The PRF previously was used during NASA’s Space Shuttle Program to manufacture and refurbish the solid rocket booster parachutes. Because of NASA’s transition from the shuttle to future commercial and government mission activities, the agreement allows NASA to preserve the unique facility capabilities for future spaceflight projects. Kennedy’s Center Planning and Development team and the Economic Development Commission of Florida’s Space Coast worked with BRS Aerospace to establish the agreement. For more information about BRS Aerospace, visit http://www.brsparachutes.com. Photo credit: NASA/Jim Grossmann
2013-07-19
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, Director Bob Cabana, at right, shakes hands with Larry Williams, president and CEO of Ballistic Recovery Systems Inc., or BRS Aerospace of Miami, Fla., after signing a new partnership agreement for use of the Parachute Refurbishment Facility, or PRF. Under a 10-year lease agreement, BRS Aerospace will operate and maintain the facility. The PRF previously was used during NASA’s Space Shuttle Program to manufacture and refurbish the solid rocket booster parachutes. Because of NASA’s transition from the shuttle to future commercial and government mission activities, the agreement allows NASA to preserve the unique facility capabilities for future spaceflight projects. Kennedy’s Center Planning and Development team and the Economic Development Commission of Florida’s Space Coast worked with BRS Aerospace to establish the agreement. For more information about BRS Aerospace, visit http://www.brsparachutes.com. Photo credit: NASA/Jim Grossmann
Measurement of entropy generation within bypass transitional flow
NASA Astrophysics Data System (ADS)
Skifton, Richard; Budwig, Ralph; McEligot, Donald; Crepeau, John
2012-11-01
A flat plate made from quartz was submersed in the Idaho National Laboratory's Matched Index of Refraction (MIR) flow facility. PIV was utilized to capture spatial vectors maps at near wall locations with five to ten points within the viscous sublayer. Entropy generation was calculated directly from measured velocity fluctuation derivatives. Two flows were studied: a zero pressure gradient and an adverse pressure gradient (β = -0.039). The free stream turbulence intensity to drive bypass transition ranged between 3% (near trailing edge) and 8% (near leading edge). The pointwise entropy generation rate will be utilized as a design parameter to systematically reduce losses. As a second observation, the pointwise entropy can be shown to predict the onset of transitional flow. This research was partially supported by the DOE EPSCOR program, grant DE-SC0004751 and by the Idaho National Laboratory. Center for Advanced Energy Studies.
Land developer participation in providing for bus transit facilities and operations
DOT National Transportation Integrated Search
2002-03-01
This report provides an overview of the various non-regulatory and regulatory approaches for engaging private sector land developer participation in contributing toward the provision of public bus transit capital facilities and the cost of operations...
Managing Inventory At A Transitional Facility
NASA Technical Reports Server (NTRS)
Hutchins, Henry A.
1993-01-01
Kennedy Inventory Management System, KIMS, geared to needs of facility in transition from research and development to manufacturing. Operated jointly by several contractors at Kennedy Space Center, KIMS designed to reduce cost and increase efficiency of fabrication and maintenance of spaceflight hardware.
NASA Astrophysics Data System (ADS)
Stevenson, Kevin
2016-10-01
JWST will revolutionize transiting exoplanet atmospheric science due to its capability for continuous, long-duration observations and, compared to existing space-based facilities, its larger collecting area, spectral coverage, and resolution. However, it is unclear precisely how well JWST will perform and which of its myriad instruments and observing modes will be best suited for transiting exoplanet studies. The Early Release Science (ERS) program was devised to provide early and open access to a broad suite of JWST science observations subject to key data analysis challenges so that the community can quickly build experience and develop a list of best observing practices prior to the Cycle 2 proposal deadline. In a recent paper, we identified 12 transiting exoplanets (dubbed community targets) that may be suitable for time-series observations within the ERS program; however, a critical unknown for the most favorable targets is the presence of obscuring clouds. To properly assess each observing mode, it is vital that the selected community target has measurable and identifiable spectroscopic features. We propose HST/WFC3 observations of four exoplanets to identify the single best target by first measuring the size of their 1.4-micron water vapor features. Next, we will perform follow-up Spitzer observations of the top two targets to determine the slopes in their infrared transmission spectra. Together, these measurements will provide the most robust determination of clouds/hazes with the minimum amount of telescope time. Cycle 24 is our final opportunity to identify suitable community targets with cloud-free atmospheres prior to the ERS proposal deadline in mid-2017.
Contribution to "AIAA Aerospace Year in Review" article
NASA Technical Reports Server (NTRS)
Grugel, Richard N.; Downey, J. Patton
2012-01-01
The NASA Marshall Space Flight Center Microgravity Science Program is dedicated to promoting our understanding of materials processing by conducting relevant experiments in the microgravity environment and supporting related modeling efforts with the intent of improving ground-based practices. Currently funded investigations include research on dopant distribution and defect formation in semiconductors, microstructural development and transitions in dendritic casting alloys, coarsening phenomena, competition between thermal and kinetic phase formation, and the formation of glassy vs. crystalline material. NASA Microgravity Materials Science Principle Investigators are selected for funding either through a proposal in response to a NASA Research Announcement or by collaborating on a team that has successfully proposed to a foreign space agency research announcement. In the latter case, a US investigator can then apply to NASA for funding through an unsolicited proposal. The International Space Station (ISS) facilities used for the experimental investigations are provided primarily by partnering with foreign agencies and often US investigators are working as a part of a larger team studying a specific area of materials science. Facilities for conducting experiments aboard the ISS include the European Space Agency (ESA) Low Gradient Facility (LGF) and the Solidification and Quench (SQF) modular inserts to the Materials Research Rack/Materials Science Laboratory and are primarily used for controlled solidification studies. The French Space Agency (CNES) provided DECLIC facility allows direct observation of morphological development in transparent materials that solidify analogously to metals. The ESA provided Electro ]Magnetic Levitator (EML) is designed to levitate, melt and then cool samples in order to determine material properties, study nucleation behavior, and document phase transitions. Finally, the Microgravity Science Glovebox (MSG) serves as a onboard facility for supporting the hardware required to conduct a number of smaller, short-term investigations.
SOFIA general investigator science program
NASA Astrophysics Data System (ADS)
Young, Erick T.; Andersson, B.-G.; Becklin, Eric E.; Reach, William T.; Sankrit, Ravi; Zinnecker, Hans; Krabbe, Alfred
2014-07-01
SOFIA is a joint project between NASA and DLR, the German Aerospace Center, to provide the worldwide astronomical community with an observatory that offers unique capabilities from visible to far-infrared wavelengths. SOFIA consists of a 2.7-m telescope mounted in a highly modified Boeing 747-SP aircraft, a suite of instruments, and the scientific and operational infrastructure to support the observing program. This paper describes the current status of the observatory and details the General Investigator program. The observatory has recently completed major development activities, and it has transitioned into full operational status. Under the General Investigator program, astronomers submit proposals that are peer reviewed for observation on the facility. We describe the results from the first two cycles of the General Investigator program. We also describe some of the new observational capabilities that will be available for Cycle 3, which will begin in 2015.
Maui Optical Tracking and Identification Facility Transition Program.
1981-08-01
USED) 2 OFFICE 19 LASER SUPPORT ROO 35 SERVICE CELL TECHT LIBARY 20 LASLAL 5 ATA LAB 36 UNDERGROUND WATER RESERVOIR S OFFICE 21 LOBBY 37 PUMP VAULT 8...precision at a rate of 50 samples per second on the system digital recorder along with time, housekeeping and ten selected dc channels which are recorded...with 12-bit precision at a rate of 90 samples per second (45 per mirror state). The digitally recorded ac and dc data can be retrieved post-mission and
2011-12-22
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, a plethora of switches fills the control panel on the flight deck of space shuttle Atlantis. The flight deck is illuminated one last time as preparations are made for the shuttle's final power down during Space Shuttle Program transition and retirement activities. Atlantis is being prepared for public display in 2013 at the Kennedy Space Center Visitor Complex. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann
NASA Technical Reports Server (NTRS)
Schneider, Steven P.
1991-01-01
Laminar-turbulent transition in high speed boundary layers is a complicated problem which is still poorly understood, partly because of experimental ambiguities caused by operating in noisy wind tunnels. The NASA Langley experience with quiet tunnel design has been used to design a quiet flow tunnel which can be constructed less expensively. Fabrication techniques have been investigated, and inviscid, boundary layer, and stability computer codes have been adapted for use in the nozzle design. Construction of such a facility seems feasible, at a reasonable cost. Two facilities have been proposed: a large one, with a quiet flow region large enough to study the end of transition, and a smaller and less expensive one, capable of studying low Reynolds number issues such as receptivity. Funding for either facility remains to be obtained, although key facility elements have been obtained and are being integrated into the existing Purdue supersonic facilities.
Jeffs, Lianne; Kitto, Simon; Merkley, Jane; Lyons, Renee F; Bell, Chaim M
2012-01-01
To explore patients' and family members' perspectives on how safety threats are detected and managed across care transitions and strategies that improve care transitions from acute care hospitals to complex continuing care and rehabilitation health care organizations. Poorly executed care transitions can result in additional health care spending due to adverse outcomes and delays as patients wait to transfer from acute care to facilities providing different levels of care. Patients and their families play an integral role in ensuring they receive safe care, as they are the one constant in care transitions processes. However, patients' and family members' perspectives on how safety threats are detected and managed across care transitions from health care facility to health care facility remain poorly understood. This qualitative study used semistructured interviews with patients (15) and family members (seven) who were transferred from an acute care hospital to a complex continuing care/rehabilitation care facility. Data were analyzed using a directed content analytical approach. OUR RESULTS REVEALED THREE KEY OVERARCHING THEMES IN THE PERCEPTIONS: lacking information, getting "funneled through" too soon, and difficulty adjusting to the shift from total care to almost self-care. Several patients and families described their expectations and experiences associated with their interfacility care transitions as being uninformed about their transfer or that transfer happened too early. In addition, study participants identified the need for having a coordinated approach to care transitions that engages patients and family members. Study findings provide patients' and family members' perspectives on key safety threats and how to improve care transitions. Of particular importance is the need for patients and family members to play a more active role in their care transition planning and self-care management.
Travel by public transit to mammography facilities in 6 US urban areas.
Graham, S; Lewis, B; Flanagan, B; Watson, M; Peipins, L
2015-12-01
We examined lack of private vehicle access and 30 minutes or longer public transportation travel time to mammography facilities for women 40 years of age or older in the urban areas of Boston, Philadelphia, San Antonio, San Diego, Denver, and Seattle to identify transit marginalized populations - women for whom these travel characteristics may jointly present a barrier to clinic access. This ecological study used sex and race/ethnicity data from the 2010 US Census and household vehicle availability data from the American Community Survey 2008-2012, all at Census tract level. Using the public transportation option on Google Trip Planner we obtained the travel time from the centroid of each census tract to all local mammography facilities to determine the nearest mammography facility in each urban area. Median travel times by public transportation to the nearest facility for women with no household access to a private vehicle were obtained by ranking travel time by population group across all U.S. census tracts in each urban area and across the entire study area. The overall median travel times for each urban area for women without household access to a private vehicle ranged from a low of 15 minutes in Boston and Philadelphia to 27 minutes in San Diego. The numbers and percentages of transit marginalized women were then calculated for all urban areas by population group. While black women were less likely to have private vehicle access, and both Hispanic and black women were more likely to be transit marginalized, this outcome varied by urban area. White women constituted the largest number of transit marginalized. Our results indicate that mammography facilities are favorably located for the large majority of women, although there are still substantial numbers for whom travel may likely present a barrier to mammography facility access.
Near-critical fluids under microgravity : status of the eseme program and perspectives for the iss
NASA Astrophysics Data System (ADS)
Beysens, D.; Garrabos, Y.
2001-03-01
Started 16 years ago, the ESEME program has led to a number of important findings. We note a simple and unified view of phase transitions, which has been applied to the development of biological patterns, and a very fast thermalization mode that we coined the "piston effect". This effect has been applied to control the cryogenic reservoirs of the Ariane 5 rocket. All these findings have been obtained thanks to the good coordination of the ESA and CNES space facilities and the construction of high technology experimental modules. The future of the program is linked to the CNES DECLIC facility and the ESA Fluid Science Laboratory (FSL). DECLIC has been designed to increase the temperature regulation above the critical point of water (550 K) so as to investigate chemical reactions under conditions of supercritical water, and in relation to the promising applications of waste treatment by supercritical oxidation. Thanks to the construction of a special vibrational Experiment Container for FSL, the thermal and mechanical behavior of fluids under forced vibration can be investigated. The results of such studies will help to estimate the effect of g-jitter on fluids, and control gases and liquids in space.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
2007-01-30
KENNEDY SPACE CENTER, FLA. -- Employees and guests are seated in the Operations and Checkout (O&C) Building high bay for the ceremony commemorating the bay's transition for use by the Constellation Program. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Predicting Nursing Facility Transition Candidates Using AID: A Case Study
ERIC Educational Resources Information Center
James, Mary L.; Wiley, Elizabeth; Fries, Brant E.
2007-01-01
Purpose: Although the nursing facility transition literature is growing, little research has analyzed the characteristics of individuals so assisted or compared participants to those who remain institutionalized. This article describes an analytic method that researchers can apply to address these knowledge gaps, using the Arkansas Passages…
10 CFR 4.127 - Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Existing facilities. 4.127 Section 4.127 Energy NUCLEAR... the effective date of this subpart, but in any event, as expeditiously as possible. (d) Transition... paragraph (a) of this section, a recipient shall develop a transition plan setting forth the steps necessary...
10 CFR 4.127 - Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Existing facilities. 4.127 Section 4.127 Energy NUCLEAR... the effective date of this subpart, but in any event, as expeditiously as possible. (d) Transition... paragraph (a) of this section, a recipient shall develop a transition plan setting forth the steps necessary...
10 CFR 4.127 - Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Existing facilities. 4.127 Section 4.127 Energy NUCLEAR... the effective date of this subpart, but in any event, as expeditiously as possible. (d) Transition... paragraph (a) of this section, a recipient shall develop a transition plan setting forth the steps necessary...
10 CFR 4.127 - Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Existing facilities. 4.127 Section 4.127 Energy NUCLEAR... the effective date of this subpart, but in any event, as expeditiously as possible. (d) Transition... paragraph (a) of this section, a recipient shall develop a transition plan setting forth the steps necessary...
Crawford, K; Digby, R; Bloomer, M; Tan, H; Williams, A
2015-01-01
Transitioning from the primary caregiver to the visitor in a long-term care facility may be challenging for the caregiver; they are required to surrender their caring duties to the medical and nursing staff. The aim of this study was to explore the experiences of caregivers during their transition from day-to-day caregiver of a person with dementia to a visitor in a long-term care facility. This study utilised a qualitative descriptive design. Twenty caregivers of people with dementia were recruited from the one Aged Rehabilitation and Geriatric Evaluation and Management facility, located in Victoria, Australia. Semi-structured interviews were used to explore the caregiver's experiences. Interviews were analysed using thematic analysis. The interview data revealed that the participants were undergoing similar experiences. The findings revealed that it was difficult for the caregiver to transition to their new role of visitor; negative reactions of grief, loss of motivation and loneliness were also coupled with positive feelings of relief and the reassurance that their relative or friend would be well cared for and safe within the long-term care facility. The findings offer insight into the experiences felt by caregivers when their relative or friend with dementia is admitted to hospital. Implications of this study include the need to improve the transition process for the caregiver by allowing them to be involved in the decision-making process, keeping them informed of care decisions, and importantly, providing emotional support to help the caregiver positively adapt to this transition.
Optimizing national immunization program supply chain management in Thailand: an economic analysis.
Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C
2015-07-01
This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
On Laminar to Turbulent Transition of Arc-Jet Flow in the NASA Ames Panel Test Facility
NASA Technical Reports Server (NTRS)
Gokcen, Tahir; Alunni, Antonella I.
2012-01-01
This paper provides experimental evidence and supporting computational analysis to characterize the laminar to turbulent flow transition in a high enthalpy arc-jet facility at NASA Ames Research Center. The arc-jet test data obtained in the 20 MW Panel Test Facility include measurements of surface pressure and heat flux on a water-cooled calibration plate, and measurements of surface temperature on a reaction-cured glass coated tile plate. Computational fluid dynamics simulations are performed to characterize the arc-jet test environment and estimate its parameters consistent with the facility and calibration measurements. The present analysis comprises simulations of the nonequilibrium flowfield in the facility nozzle, test box, and flowfield over test articles. Both laminar and turbulent simulations are performed, and the computed results are compared with the experimental measurements, including Stanton number dependence on Reynolds number. Comparisons of computed and measured surface heat fluxes (and temperatures), along with the accompanying analysis, confirm that that the boundary layer in the Panel Test Facility flow is transitional at certain archeater conditions.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Sustainable infrastructure system modeling under uncertainties and dynamics
NASA Astrophysics Data System (ADS)
Huang, Yongxi
Infrastructure systems support human activities in transportation, communication, water use, and energy supply. The dissertation research focuses on critical transportation infrastructure and renewable energy infrastructure systems. The goal of the research efforts is to improve the sustainability of the infrastructure systems, with an emphasis on economic viability, system reliability and robustness, and environmental impacts. The research efforts in critical transportation infrastructure concern the development of strategic robust resource allocation strategies in an uncertain decision-making environment, considering both uncertain service availability and accessibility. The study explores the performances of different modeling approaches (i.e., deterministic, stochastic programming, and robust optimization) to reflect various risk preferences. The models are evaluated in a case study of Singapore and results demonstrate that stochastic modeling methods in general offers more robust allocation strategies compared to deterministic approaches in achieving high coverage to critical infrastructures under risks. This general modeling framework can be applied to other emergency service applications, such as, locating medical emergency services. The development of renewable energy infrastructure system development aims to answer the following key research questions: (1) is the renewable energy an economically viable solution? (2) what are the energy distribution and infrastructure system requirements to support such energy supply systems in hedging against potential risks? (3) how does the energy system adapt the dynamics from evolving technology and societal needs in the transition into a renewable energy based society? The study of Renewable Energy System Planning with Risk Management incorporates risk management into its strategic planning of the supply chains. The physical design and operational management are integrated as a whole in seeking mitigations against the potential risks caused by feedstock seasonality and demand uncertainty. Facility spatiality, time variation of feedstock yields, and demand uncertainty are integrated into a two-stage stochastic programming (SP) framework. In the study of Transitional Energy System Modeling under Uncertainty, a multistage stochastic dynamic programming is established to optimize the process of building and operating fuel production facilities during the transition. Dynamics due to the evolving technologies and societal changes and uncertainty due to demand fluctuations are the major issues to be addressed.
Spitzer Transits of New TESS Planets
NASA Astrophysics Data System (ADS)
Crossfield, Ian; Werner, Michael; Dragomir, Diana; Kreidberg, Laura; Benneke, Bjoern; Deming, Drake; Gorjian, Varoujan; Guo, Xueying; Dressing, Courtney; Yu, Liang; Kane, Stephen; Christiansen, Jessie; Berardo, David; Morales, Farisa
2018-05-01
TESS will soon begin searching the sky for new transiting planets around the nearest, brightest stars, and JWST will become the world-leading facility in exoplanet atmospheric characterization. A key TESS goal is to provide the best atmospheric targets to JWST. However, many new TESS planets will exhibit just a few transits each, so their transit ephemerides will be only weakly constrained; without additional constraints on the planet orbit, the transits will be quickly "lost" long before JWST transit spectroscopy can commence. Some TESS planets will also be good targets for JWST secondary eclipses observations, but these eclipses will be even harder to pin down from TESS data alone. Spitzer's IR sensitivity and photometric stability can identify the transits and eclipses of the most favorable TESS planets and set the stage for JWST atmospheric characterization on a large scale. We request 550 hr to use Spitzer to measure precise transits and eclipses of new planets from the first year of TESS, refining their properties and ensuring their transits and eclipses can be recovered for many years to come. We will focus on the smaller planets for which ground-based observations are impractical and for which JWST spectroscopy will have a high impact. The time baseline provided by Spitzer will pin down the ephemerides far into the future. Thus our proposed program will secure these planets for future JWST spectroscopy to reveal their atmospheric makeup, chemistry, cloud properties, and formation history in unprecedented detail.
Bennett, Sara; Singh, Suneeta; Rodriguez, Daniela; Ozawa, Sachiko; Singh, Kriti; Chhabra, Vibha; Dhingra, Neeraj
2015-01-01
Background Between 2009–2013 the Bill and Melinda Gates Foundation transitioned its HIV/AIDS prevention initiative in India from being a stand-alone program outside of government, to being fully government funded and implemented. We present an independent prospective evaluation of the transition. Methods The evaluation drew upon (1) a structured survey of transition readiness in a sample of 80 targeted HIV prevention programs prior to transition; (2) a structured survey assessing institutionalization of program features in a sample of 70 targeted intervention (TI) programs, one year post-transition; and (3) case studies of 15 TI programs. Findings Transition was conducted in 3 rounds. While the 2009 transition round was problematic, subsequent rounds were implemented more smoothly. In the 2011 and 2012 transition rounds, Avahan programs were well prepared for transition with the large majority of TI program staff trained for transition, high alignment with government clinical, financial and managerial norms, and strong government commitment to the program. One year post transition there were significant program changes, but these were largely perceived positively. Notable negative changes were: limited flexibility in program management, delays in funding, commodity stock outs, and community member perceptions of a narrowing in program focus. Service coverage outcomes were sustained at least six months post-transition. Interpretation The study suggests that significant investments in transition preparation contributed to a smooth transition and sustained service coverage. Notwithstanding, there were substantive program changes post-transition. Five key lessons for transition design and implementation are identified. PMID:26327591
Basis for Interim Operation for Fuel Supply Shutdown Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENECKE, M.W.
2003-02-03
This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less
Cumulative reports and publications
NASA Technical Reports Server (NTRS)
1993-01-01
A complete list of Institute for Computer Applications in Science and Engineering (ICASE) reports are listed. Since ICASE reports are intended to be preprints of articles that will appear in journals or conference proceedings, the published reference is included when it is available. The major categories of the current ICASE research program are: applied and numerical mathematics, including numerical analysis and algorithm development; theoretical and computational research in fluid mechanics in selected areas of interest to LaRC, including acoustics and combustion; experimental research in transition and turbulence and aerodynamics involving LaRC facilities and scientists; and computer science.
2011-12-22
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, the controller used during docking to the airlock of space shuttle Atlantis stands among the switches filling the control panel on the flight deck. The flight deck is illuminated one last time as preparations are made for the shuttle's final power down during Space Shuttle Program transition and retirement activities. Atlantis is being prepared for public display in 2013 at the Kennedy Space Center Visitor Complex. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann
NASA Astrophysics Data System (ADS)
Xiong, Lun; Liu, Jing
2018-03-01
Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 10875142 and 11079040) the Project of Sichuan University of Arts and Science, China (Grant No. 2017KZ001Z), and the Program of Education Department of Sichuan Province, China (Grant No. 18ZB0506). This work was performed at 4W2 beamline of Beijing Synchrotron Radiation Facility (BSRF), which was supported by Chinese Academy of Sciences (Grant Nos. KJCX2-SWN03 and KJCX2-SW-N20).
Experimental study of flow due to an isolated suction hole and a partially plugged suction slot
NASA Technical Reports Server (NTRS)
Goglia, G. L.; Wilkinson, S. P.
1980-01-01
Details for construction of a model of a partially plugged, laminar flow control, suction slot and an isolated hole are presented. The experimental wind tunnel facility and instrumentation is described. Preliminary boundary layer velocity profiles (without suction model) are presented and shown to be in good agreement with the Blasius laminar profile. Recommendations for the completion of the study are made. An experimental program for study of transition on a rotating disk is described along with preliminary disturbance amplification rate data.
Nakanishi, Miharu; Hattori, Keiko; Nakashima, Taeko; Sawamura, Kanae
2014-01-01
Japan has had high rates of transition to nursing homes from other long term care facilities. It has been hypothesized that care transitions occur because a resident's condition deteriorates. The aim of the present study was to compare the health care and personal care needs of residents in nursing homes, group homes, and congregate housing in Japan. The present study was conducted using a cross-sectional study design. The present study included 70,519 elderly individuals from 5 types of residential facilities: care medical facilities (heavy medical care; n = 17,358), geriatric intermediate care facilities (rehabilitation aimed toward a discharge to home; n = 26,136), special nursing homes (permanent residence; n = 20,564), group homes (group living, n = 1454), and fee-based homes for the elderly (congregate housing; n = 5007). The managing director at each facility provided information on the residents' health care and personal care needs, including activities of daily living (ADLs), level of required care, level of cognitive impairment, current disease treatment, and medical procedures. A multinomial logistic regression analysis demonstrated a significantly lower rate of medical procedures among the residents in special nursing homes compared with those in care medical facilities, geriatric intermediate care facilities, group homes, and fee-based homes for the elderly. The residents of special nursing homes also indicated a significantly lower level of required care than those in care medical facilities. The results of our study suggest that care transitions occur because of unavailable permanent residence option for people who suffer with medical deterioration. The national government should modify residential facilities by reorganizing several types of residential facilities into nursing homes that provide a place of permanent residence. Copyright © 2014 American Medical Directors Association, Inc. Published by Elsevier Inc. All rights reserved.
49 CFR 1580.203 - Reporting significant security concerns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... heavy rail transit, light rail transit, automated guideway, cable car, inclined plane, funicular, and... or transit vehicle crew. (2) Bomb threats, specific and non-specific. (3) Reports or discovery of... a train or transit vehicle or inside the facility of a passenger railroad carrier or rail transit...
49 CFR 1580.203 - Reporting significant security concerns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... heavy rail transit, light rail transit, automated guideway, cable car, inclined plane, funicular, and... or transit vehicle crew. (2) Bomb threats, specific and non-specific. (3) Reports or discovery of... a train or transit vehicle or inside the facility of a passenger railroad carrier or rail transit...
49 CFR 1580.203 - Reporting significant security concerns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... heavy rail transit, light rail transit, automated guideway, cable car, inclined plane, funicular, and... or transit vehicle crew. (2) Bomb threats, specific and non-specific. (3) Reports or discovery of... a train or transit vehicle or inside the facility of a passenger railroad carrier or rail transit...
49 CFR 1580.203 - Reporting significant security concerns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... heavy rail transit, light rail transit, automated guideway, cable car, inclined plane, funicular, and... or transit vehicle crew. (2) Bomb threats, specific and non-specific. (3) Reports or discovery of... a train or transit vehicle or inside the facility of a passenger railroad carrier or rail transit...
2015-08-05
This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) (which are freestanding IPFs and psychiatric units of an acute care hospital or critical access hospital). These changes are applicable to IPF discharges occurring during fiscal year (FY) 2016 (October 1, 2015 through September 30, 2016). This final rule also implements: a new 2012-based IPF market basket; an updated IPF labor-related share; a transition to new Core Based Statistical Area (CBSA) designations in the FY 2016 IPF Prospective Payment System (PPS) wage index; a phase-out of the rural adjustment for IPF providers whose status changes from rural to urban as a result of the wage index CBSA changes; and new quality measures and reporting requirements under the IPF quality reporting program. This final rule also reminds IPFs of the October 1, 2015 implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), and updates providers on the status of IPF PPS refinements.
2007-01-30
KENNEDY SPACE CENTER, FLA. -- Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center, addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. Seated on the dais at right are Cleon Lacefield, Lockheed Martin program manager; Thad Altman, representative of the State of Florida; Bill Parsons, Kennedy Space Center director; Steve Koller, executive director of Space Florida; and Skip Hatfield, Orion Project manager. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
An evaluation of the effects of transit oriented development in a suburban environment
DOT National Transportation Integrated Search
2010-10-01
Transit-Oriented Development (TOD) refers to dense, pedestrian-friendly, livable communities : that have good transit as a nucleus. While transit facilities are missing in most suburban towns and the residents are heavily dependent on their vehicles,...
ERIC Educational Resources Information Center
Kelsey, Susan G.; Laditka, Sarah B.; Laditka, James N.
2010-01-01
Purpose: This study examines transitioning residents with Alzheimer's disease or a related disorder (ADRD) from assisted living facilities (ALFs) to memory care units (MCUs) from the perspective of 3 ALF organizational models: freestanding ALFs, ALFs with MCUs, and ALFs in continuing care retirement communities (CCRCs) with MCUs. Design and…
Travel by public transit to mammography facilities in 6 US urban areas
Graham, S; Lewis, B; Flanagan, B; Watson, M; Peipins, L
2017-01-01
We examined lack of private vehicle access and 30 minutes or longer public transportation travel time to mammography facilities for women 40 years of age or older in the urban areas of Boston, Philadelphia, San Antonio, San Diego, Denver, and Seattle to identify transit marginalized populations - women for whom these travel characteristics may jointly present a barrier to clinic access. This ecological study used sex and race/ethnicity data from the 2010 US Census and household vehicle availability data from the American Community Survey 2008–2012, all at Census tract level. Using the public transportation option on Google Trip Planner we obtained the travel time from the centroid of each census tract to all local mammography facilities to determine the nearest mammography facility in each urban area. Median travel times by public transportation to the nearest facility for women with no household access to a private vehicle were obtained by ranking travel time by population group across all U.S. census tracts in each urban area and across the entire study area. The overall median travel times for each urban area for women without household access to a private vehicle ranged from a low of 15 minutes in Boston and Philadelphia to 27 minutes in San Diego. The numbers and percentages of transit marginalized women were then calculated for all urban areas by population group. While black women were less likely to have private vehicle access, and both Hispanic and black women were more likely to be transit marginalized, this outcome varied by urban area. White women constituted the largest number of transit marginalized. Our results indicate that mammography facilities are favorably located for the large majority of women, although there are still substantial numbers for whom travel may likely present a barrier to mammography facility access. PMID:29285434
Desveaux, Laura; Harrison, Samantha; Lee, Annemarie; Mathur, Sunita; Goldstein, Roger; Brooks, Dina
Despite well-established improvements following rehabilitation, functional gains often diminish following discharge. To explore the attitudes of older adults with HF and COPD, who have completed rehabilitation, toward community-based exercise maintenance. Semi-structured interviews were conducted with 11 individuals with HF or COPD. Deductive thematic analysis uncovered three themes: 1) transitioning to community exercise is challenging, highlighting participants' struggle with unstructured maintenance and a lack of appropriate programs; 2) a structured, group-based program tailored to functional ability facilitates adherence, describing participants views on the importance of routine, and accountability; and 3) "We are all there for the same purpose" - participant support for integrated exercise, including the benefit of multiple perspectives and sustainability. A motivating program leader and access to appropriate facilities are key features to support adherence to prescribed activity. Tailored programs can be delivered consecutively to older adults with HF and COPD. Copyright © 2017 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilkerson, Andrea M.; Abell, Thomas C.; Perrin, Tess E.
The University of Maryland (UMD) began retrofitting halogen wall washers in the Clarice Smith Performing Arts Center (CSPAC) in April 2014. The U.S. Department of Energy (DOE) Solid-State Lighting (SSL) GATEWAY program documented this process through the final installation in March 2015, summarized in this report. The wall washers illuminate hallways lining the atrium, providing task illuminance for transitioning between spaces and visual interest to the atrium boundaries. The main goals of the retrofit were to maintain the visual appearance of the space while reducing maintenance costs – energy savings was considered an additional benefit by UMD Facilities Management. UMDmore » Facilities Management is pleased with the results of this retrofit, and continues to initiate LED retrofit projects across the UMD campus.« less
Particle deposition onto people in a transit venue
Liljegren, James C.; Brown, David F.; Lunden, Melissa M.; ...
2016-07-11
Following the release of an aerosolized biological agent in a transit venue, material deposited on waiting passengers and subsequently shed from their clothing may significantly magnify the scope and consequences of such an attack. Published estimates of the relevant particle deposition and resuspension parameters for complex, real-world environments such as a transit facility are non-existent. In this study, measurements of particle deposition velocity onto cotton fabric samples affixed to stationary and walking persons in a large multimodal transit facility were obtained for tracer particle releases carried out as part of a larger study of subway airflows and particulate transport. Depositionmore » velocities onto cotton and wool were also obtained using a novel automated sampling mechanism deployed at locations in the transit facility and throughout the subway. The data revealed higher deposition velocities than have been previously reported for people exposed in test chambers or office environments. Furthermore, the relatively high rates of deposition onto people in a transit venue obtained in this study suggest it is possible that fomite transport by subway and commuter/regional rail passengers could present a significant mechanism for rapidly dispersing a biological agent throughout a metropolitan area and beyond.« less
Particle deposition onto people in a transit venue
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liljegren, James C.; Brown, David F.; Lunden, Melissa M.
Following the release of an aerosolized biological agent in a transit venue, material deposited on waiting passengers and subsequently shed from their clothing may significantly magnify the scope and consequences of such an attack. Published estimates of the relevant particle deposition and resuspension parameters for complex, real-world environments such as a transit facility are non-existent. In this study, measurements of particle deposition velocity onto cotton fabric samples affixed to stationary and walking persons in a large multimodal transit facility were obtained for tracer particle releases carried out as part of a larger study of subway airflows and particulate transport. Depositionmore » velocities onto cotton and wool were also obtained using a novel automated sampling mechanism deployed at locations in the transit facility and throughout the subway. The data revealed higher deposition velocities than have been previously reported for people exposed in test chambers or office environments. Furthermore, the relatively high rates of deposition onto people in a transit venue obtained in this study suggest it is possible that fomite transport by subway and commuter/regional rail passengers could present a significant mechanism for rapidly dispersing a biological agent throughout a metropolitan area and beyond.« less
Feasibility study of heavy ion physics program at NICA
NASA Astrophysics Data System (ADS)
Batyuk, P. N.; Kekelidze, V. D.; Kolesnikov, V. I.; Rogachevsky, O. V.; Sorin, A. S.; Voronyuk, V. V.
2016-07-01
There are strong experimental and theoretical evidences that in collisions of heavy ions at relativistic energies nuclear matter undergoes a phase transition to the deconfined state—Quark Gluon Plasma. The caused energy region of such transition was not found at high energy at SPS and RHIC and search for this energy is shifted to lower energies, which will be covered by the future NICA (Dubna), FAIR (Darmstadt) facilities and BES II at RHIC. Fixed target and collider experiments at the NICA facility will work at the energy range from a few AGeV up to √ {{S_{NN}}} = 11GeV GeV and will study the most interesting area on the nuclear matter phase diagram. The most remarkable results were observed in the study of collective phenomena occurring in the early stage of nuclear collisions. Investigation of the collective flow will provide information on Equation of State (EoS) for nuclear matter. Study of the Event-by-Event fluctuations and correlations can give us signals of critical behavior of the system. Femtoscopy analysis provides the space-time history of the collisions. Also, it was found that baryon stopping power revealing itself as a "wiggle" in excitation function of curvature of the (net)proton rapidity spectrum relates to the order of the phase transition. The available observations of an enhancement of dilepton rates at low invariant masses may serve as a signal of the chiral symmetry restoration in hot and dense matter. Due to this fact, measurements of the dilepton spectra are considered to be an important part of the NICA physics program. The study of strange particles and hypernuclei production gives additional information on the EoS and "strange" axis of the QCD phase diagram. In this paper a feasibility of the considered investigations is shown by the detailed Monte Carlo simulations applied to the planned experiments (BM@N, MPD) at NICA.
Interim Consequence Management Guidance for a Wide-Area Biological Attack
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raber, Ellen; Kirvel, Robert; MacQueen, Don
2011-05-17
The Interagency Biological Restoration Demonstration (IBRD) program is a collaborative, interagency effort co-chaired by the Department of Homeland Security and Department of Defense aimed at improving the nation‘s ability to respond to and recover from a large-scale, wide-area, domestic attack involving the release of an environmentally persistent biological warfare agent. The program is focused on understanding interactions between the civilian and military sectors, and in building mutual support to carry out such remediations. This Interim Consequence Management Guidance document provides guidance for decisionmakers in executing activities required to respond to and recover from a biological incident affecting a wide urbanmore » area insofar as information is currently available. The spore-forming bacterium Bacillus anthracis is discussed as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the key threat agents. Most other biological threat agents are much easier to remediate, and in many cases, inactivation would occur naturally within days as a result of environmental exposure; however, the framework and operational questions that need to be addressed are expected to remain the same. The guidance in this document is applicable to (1) enclosed facilities, such as commercial, residential, and continental U.S. military facilities; (2) semi-enclosed facilities, such as subways and public transit facilities; (3) outdoor areas (both localized and wide area), such as building exteriors, streets, parks, and other open spaces; (4) drinking water facilities; and (5) drinking water sources. This document follows an interagency framework [Planning Guidance for Recovery Following Biological Incidents (DHS and EPA 2009)]—which considered Raber et al. (2002) in its development—but takes the framework to a more operational level and provides guidance at key action and decision points.« less
Supporting Energy Transitions and Miscanthus Program Development at the University of Iowa
NASA Astrophysics Data System (ADS)
Lain, Kayley Christina
Miscanthus is a highly productive, low-input biofuel crop that supports agricultural diversification with improved performance for climate commitment, energy security, and water quality over first generation biofuels. Despite its high performance, no local or regional markets for the feedstock have formed in North America, and current climate-based productivity assessment methods lack the information farmers and decision-makers need to establish commercial scale bioenergy markets, programs, and thermal co-firing plans. This study develops a Miscanthus Suitability Rating and a transferable field-scale siting method, applied at 10 m resolution across the State of Iowa to assess miscanthus production potential and identify individual farms that are highly suitable for large-scale miscanthus cultivation while maintaining a majority of existing row cropping acreage. Results show that highly suitable fields within 50 miles (84 km) of each of Iowa's coal-fired electrical generating units (EGUs) can displace up to 43% of current coal consumption. Every EGU in Iowa has land resource to produce local miscanthus to co-fire with other solid fuels at industry-leading levels without significantly impacting local row crop production. Seven of the state's smaller facilities could even operate exclusively on local miscanthus with advancements in densification technology. The energy evaluation tool developed in this work estimates the energy return on investment (EROI) of Iowa miscanthus for existing thermal generation facilities between 37 and 59, depending on transportation requirements and chemical field applications. This transition would diversify local agribusiness and energy feedstocks, reduce greenhouse gas emissions and provide a sustainable, dispatchable, in-state fuel source to complement wind and solar energy.
NASA Technical Reports Server (NTRS)
1990-01-01
This report contains the individual presentations delivered at the Space Station Evolution Symposium in League City, Texas on February 6, 7, 8, 1990. Personnel responsible for Advanced Systems Studies and Advanced Development within the Space Station Freedom program reported on the results of their work to date. Systems Studies presentations focused on identifying the baseline design provisions (hooks and scars) necessary to enable evolution of the facility to support changing space policy and anticipated user needs. Also emphasized were evolution configuration and operations concepts including on-orbit processing of space transfer vehicles. Advanced Development task managers discussed transitioning advanced technologies to the baseline program, including those near-term technologies which will enhance the safety and productivity of the crew and the reliability of station systems. Special emphasis was placed on applying advanced automation technology to ground and flight systems. This publication consists of two volumes. Volume 1 contains the results of the advanced system studies with the emphasis on reference evolution configurations, system design requirements and accommodations, and long-range technology projections. Volume 2 reports on advanced development tasks within the Transition Definition Program. Products of these tasks include: engineering fidelity demonstrations and evaluations on Station development testbeds and Shuttle-based flight experiments; detailed requirements and performance specifications which address advanced technology implementation issues; and mature applications and the tools required for the development, implementation, and support of advanced technology within the Space Station Freedom Program.
Telescope Fabra ROA Montsec: A New Robotic Wide Field Baker-Nunn Facility
NASA Astrophysics Data System (ADS)
Fors, Octavi; Núñez, Jorge; Muiños, José Luis; Montojo, Francisco Javier; Baena-Gallé, Roberto; Boloix, Jaime; Morcillo, Ricardo; Merino, María Teresa; Downey, Elwood C.; Mazur, Michael J.
2013-05-01
A Baker-Nunn Camera (BNC), originally installed at the Real Instituto y Observatorio de la Armada (ROA) in 1958, was refurbished and robotized. The new facility, called Telescope Fabra ROA Montsec (TFRM), was installed at the Observatori Astronòmic del Montsec (OAdM). The process of refurbishment is described in detail. Most of the steps of the refurbishment project were accomplished by purchasing commercial components, which involve little posterior engineering assembling work. The TFRM is a 0.5 m aperture f/0.96 optically modified BNC, which offers a unique combination of instrumental specifications: fully robotic and remote operation, wide field of view (4°.4 × 4°.4), moderate limiting magnitude (V ˜ 19.5 mag), ability of tracking at arbitrary right ascension (α) and declination (δ) rates, as well as opening and closing CCD shutter at will during an exposure. Nearly all kinds of image survey programs can benefit from those specifications. Apart from other less time-consuming programs, since the beginning of science TFRM operations we have been conducting two specific and distinct surveys: super-Earths transiting around M-type dwarfs stars, and geostationary debris in the context of Space Situational Awareness/Space Surveillance and Tracking (SSA/SST) programs. Preliminary results for both cases will be shown.
Noroozi, Alireza; Malekinejad, Mohsen; Rahimi-Movaghar, Afarin
2018-01-29
Iran has experienced an emerging epidemic of methamphetamine use during recent years which has added to existing non-injecting and injecting opioid use in the country. This study explored factors influencing the initiation into or transition to methamphetamine use among young people who use drugs (PWUD). We conducted 42 semi-structured, in-depth interviews with young PWUD (n = 35) and health care workers (HCWs) (n = 7) between July and October 2011 in Tehran, Iran. The PWUD were purposefully recruited from different tiers of drug services and lived in geographically diverse areas of Tehran. The HCWs were substance use experts and/or service providers of treatment and harm reduction facilities. All interviews were recorded, transcribed, and coded using OpenCode 3.6 software. The predominant factors for initiation into or transition to methamphetamine use were individual domain factors. The peer domain factors were the second most frequently stated perceived factor category for transition to methamphetamine use. Other perceived factors affecting transition to stimulant use included both family and community domains. Drug prevention programs should consider targeting certain settings, including workplaces and sports clubs, for preventative interventions. Existing opioid treatment and harm reduction services should be adjusted in response to the methamphetamine use epidemic.
Iseler, Jackeline; Fox, John; Wierenga, Kelly
2018-06-01
The 30-day readmission rate for patients with a left ventricular assist device implantation at a large, urban, Midwest hospital system (from October 2013 to September 2014) was estimated at 32.1%. Readmission rates were a concern at this facility. Review of the readmissions, change in practice, and home expectations of patients and families have identified an opportunity to improve the transitions of care for this left ventricular assist device (LVAD) program. Therefore, the purpose of this project was to evaluate the effectiveness and feasibility of a transitional care model (TCM) for care of patients with left ventricular devices. Ten patients were enrolled in the pilot that was implemented in June 2015. A transitional care nurse trained to support patients with ventricular assist devices was used to facilitate patient flow. The goal was to create an individualized plan for the development or improvement of self-management skills to decrease readmission rates. The transitional care nurse collaborated with the ventricular device team. The 30-day readmission rate during the pilot was 14.3% compared to the previous annual overall rate of 42.6%. Based on these results, further research is recommended into interventions consistent with the TCM to advance care coordination and to facilitate care transition in the this fragile patient population.
2001-01-12
This final rule modifies the Medicaid upper payment limits for inpatient hospital services, outpatient hospital services, nursing facility services, intermediate care facility services for the mentally retarded, and clinic services. For each type of Medicaid inpatient service, existing regulations place an upper limit on overall aggregate payments to all facilities and a separate aggregate upper limit on payments made to State-operated facilities. This final rule establishes an aggregate upper limit that applies to payments made to government facilities that are not State government-owned or operated, and a separate aggregate upper limit on payments made to privately-owned and operated facilities. This rule also eliminates the overall aggregate upper limit that had applied to these services. With respect to outpatient hospital and clinic services, this final rule establishes an aggregate upper limit on payments made to State government-owned or operated facilities, an aggregate upper limit on payments made to government facilities that are not State government-owned or operated, and an aggregate upper limit on payments made to privately-owned and operated facilities. These separate upper limits are necessary to ensure State Medicaid payment systems promote economy and efficiency. We are allowing a higher upper limit for payment to non-State public hospitals to recognize the higher costs of inpatient and outpatient services in public hospitals. In addition, to ensure continued beneficiary access to care and the ability of States to adjust to the changes in the upper payment limits, the final rule includes a transition period for States with approved rate enhancement State plan amendments.
Team processes in airway facilities operations control centers.
DOT National Transportation Integrated Search
2000-07-01
In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...
43 CFR 17.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Program accessibility: Existing facilities....550 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or... its existing facilities or every part of a facility accessible to and usable by handicapped persons...
Eliminating barriers to transit-oriented development : final report, March 2010.
DOT National Transportation Integrated Search
2010-03-01
Transit-oriented development refers to dense, mixed-use development near transit facilities, : particularly denser housing development. Achieving such density is a politically difficult goal. In New : Jersey, the main barriers are community con...
Transit green building action plan : report to congress
DOT National Transportation Integrated Search
2009-06-04
The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...
49 CFR 37.45 - Construction and alteration of transportation facilities by private entities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities by private entities. 37.45 Section 37.45 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.45 Construction and alteration of transportation facilities by private entities. In constructing and altering transit...
Boxer, Rebecca S.; Dolansky, Mary A.; Bodnar, Christine A.; Singer, Mendel E.; Albert, Jeffery M.; Gravenstein, Stefan
2013-01-01
Background Heart failure disease management can improve health outcomes for older community dwelling patients with heart failure. Heart failure disease management has not been studied in skilled nursing facilities, a major site of transitional care for older adults. Methods and Anticipated Results The objective of this trial is to investigate if a heart failure disease management program (HF-DMP) in skilled nursing facilities (SNF) will decrease all-cause rehospitalizations for the first 60 days post SNF admission. The trial is a randomized cluster trial to be conducted in 12 for-profit SNF in the greater Cleveland area. The study population is inclusive of patients with heart failure regardless of ejection fraction but excludes those patients on dialysis and with a life expectancy of 6 months or less. The HF-DMP includes 7 elements considered standard of care for patients with heart failure: documentation of left ventricular function, tracking of weight and symptoms, medication titration, discharge instructions, 7 day follow up appointment post SNF discharge, patient education. The HF-DMP is conducted by a research nurse tasked with adhering to each element of the program and regularly audited to maintain fidelity of the program. Additional outcomes include health status, self-care management, and discharge destination. Conclusion The SNF-Connect Trial is the first trial of its kind to assess if a HF-DMP will improve outcomes for patients in SNFs. This trial will provide evidence on the effectiveness of HF-DMP to improve outcomes for older frail heart failure patients undergoing post-acute rehabilitation. PMID:23871475
Boxer, Rebecca S; Dolansky, Mary A; Bodnar, Christine A; Singer, Mendel E; Albert, Jeffery M; Gravenstein, Stefan
2013-09-01
Heart failure (HF) disease management can improve health outcomes for older community dwelling patients with heart failure. HF disease management has not been studied in skilled nursing facilities, a major site of transitional care for older adults. The objective of this trial is to investigate if a HF- disease management program (HF-DMP) in skilled nursing facilities (SNF)s will decrease all-cause rehospitalizations for the first 60 days post-SNF admission. The trial is a randomized cluster trial to be conducted in 12 for-profit SNF in the greater Cleveland area. The study population is inclusive of patients with HF regardless of ejection fraction but excludes those patients on dialysis and with a life expectancy of 6 months or less. The HF-DMP includes 7 elements considered standard of care for patients with HF documentation of left ventricular function, tracking of weight and symptoms, medication titration, discharge instructions, 7-day follow-up appointment post-SNF discharge, and patient education. The HF-DMP is conducted by a research nurse tasked with adhering to each element of the program and regularly audited to maintain fidelity of the program. Additional outcomes include health status, self-care management, and discharge destination. The SNF-Connect Trial is the first trial of its kind to assess if a HF-DMP will improve outcomes for patients in SNFs. This trial will provide evidence on the effectiveness of HF-DMP to improve outcomes for older frail HF patients undergoing postacute rehabilitation. Copyright © 2013 American Medical Directors Association, Inc. Published by Elsevier Inc. All rights reserved.
New graduate nurse transition programs: Relationships with bullying and access to support.
Rush, Kathy L; Adamack, Monica; Gordon, Jason; Janke, Robert
2014-01-01
Abstract New graduate nurses are often targets of bullying and horizontal violence. The support offered by new graduate nurse transition programs may moderate the effects of bullying and limit its negative impact on new graduate nurse transition. This study examined the relationships between access to support, workplace bullying and new graduate nurse transition within the context of new graduate transition programs. As part of a mixed methods study, an online survey was administered to new graduates (N = 245) approximately a year from starting employment. Bullied new graduate nurses were less able to access support when needed and had poorer transition experiences than their non-bullied peers. Participation in a formal transition program improved access to support and transition for bullied new graduate nurses. People supports within transition programs positively influenced the new graduate nurse transition experience. Formal transition programs provide support that attenuates the impact of bullying on new graduate nurses and improves transition.
New Graduate Transition Programs: Relationships With Access to Support and Bullying.
Rush, Kathy L; Adamack, Monica; Gordon, Jason; Janke, Robert
2014-02-03
Abstract New graduate nurses are often targets of bullying and horizontal violence. The support offered by new graduate nurse transition programs may moderate the effects of bullying and limit its negative impact on new graduate nurse transition. This study examined the relationships between access to support, workplace bullying and new graduate nurse transition within the context of New Graduate Transition programs. As part of a mixed methods study, an online survey was administered to new graduates (n=245) approximately a year from starting employment. Bullied new graduate nurses were less able to access support when needed and had poorer transition experiences than their non-bullied peers. Participation in a formal transition program improved access to support and transition for bullied new graduate nurses. People supports within transition programs positively influenced the new graduate nurse transition experience. Formal transition programs provide support that attenuates the impact of bullying on new graduate nurses and improves transition.
77 FR 14465 - Public Transportation on Indian Reservations Program; Tribal Transit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Public Transportation on Indian... in funding provided by the Public Transportation on Indian Reservations Program (Tribal Transit... establishing the Public Transportation on Indian Reservations Program (Tribal Transit Program or TTP). This...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-04-01
A transportation policy analysis methodology described in Guidelines for Travel Demand Analyses of Program Measures to Promote Carpools, Vanpools, and Public Transportation, November, 1976 (EAPA 4:1921) is demonstrated. The results reported build upon the two levels of analysis capabilities (a fully calibrated and operational computer package based on a set of disaggregate travel demand models that were estimated on a random sample of urban travelers and a manual procedure or sketch planning pivot-point version of the above methodology) and have undertaken to accomplish the following objectives: transferability, testing the manual approach on actual applications, and validating the method. The firstmore » objective was investigated by examining and comparing disaggregate models that were estimated in 7 US cities by eight different organizations. The next two objectives were investigated using separate case studies: the Washington, DC, Shirley Highway preferential transit and carpool lanes; the Portland, Oregon, Banfield Highway Expressway preferential transit and carpool lanes; the Los Angeles, Santa Monica Freeway preferential Diamond Lane and ramp metering facilities for transit and carpools; the Minneapolis, express bus on metered freeway project; and the Portland, Oregon, carpool matching and promotion programs for the general public and for employer-based groups. Principal findings are summarized and results consolidated. (MCW)« less
Evolution paths for advanced automation
NASA Technical Reports Server (NTRS)
Healey, Kathleen J.
1990-01-01
As Space Station Freedom (SSF) evolves, increased automation and autonomy will be required to meet Space Station Freedom Program (SSFP) objectives. As a precursor to the use of advanced automation within the SSFP, especially if it is to be used on SSF (e.g., to automate the operation of the flight systems), the underlying technologies will need to be elevated to a high level of readiness to ensure safe and effective operations. Ground facilities supporting the development of these flight systems -- from research and development laboratories through formal hardware and software development environments -- will be responsible for achieving these levels of technology readiness. These facilities will need to evolve support the general evolution of the SSFP. This evolution will include support for increasing the use of advanced automation. The SSF Advanced Development Program has funded a study to define evolution paths for advanced automaton within the SSFP's ground-based facilities which will enable, promote, and accelerate the appropriate use of advanced automation on-board SSF. The current capability of the test beds and facilities, such as the Software Support Environment, with regard to advanced automation, has been assessed and their desired evolutionary capabilities have been defined. Plans and guidelines for achieving this necessary capability have been constructed. The approach taken has combined indepth interviews of test beds personnel at all SSF Work Package centers with awareness of relevant state-of-the-art technology and technology insertion methodologies. Key recommendations from the study include advocating a NASA-wide task force for advanced automation, and the creation of software prototype transition environments to facilitate the incorporation of advanced automation in the SSFP.
2013-09-09
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center Visitor Complex in Florida, officials pose at the site where a Shuttle Program time capsule has been secured vault within the walls of the Space Shuttle Atlantis home at the Kennedy Space Center Visitor Complex. From the left are: Pete Nickolenko, deputy director of NASA Ground Processing at Kennedy, Patty Stratton of Abacus Technology, currently program manager for the Information Management Communications Support Contract. During the Shuttle Program she was deputy director of Ground Operations for NASA's Space Program Operations Contractor, United Space Alliance, Rita Wilcoxon, NASA's now retired director of Shuttle Processing, Bob Cabana, director of the Kennedy Space Center and George Jacobs, deputy director of Center Operations, who was manager of the agency's Shuttle Transition and Retirement Project Office. The time capsule, containing artifacts and other memorabilia associated with the history of the program is designated to be opened on the 50th anniversary of the shuttle's final landing, STS-135. The new $100 million "Space Shuttle Atlantis" facility includes interactive exhibits that tell the story of the 30-year Space Shuttle Program and highlight the future of space exploration. Photo credit: NASA/Jim Grossmann
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schadmand, Susan
2010-12-28
The WASA detector facility is an internal experiment at the COoler SYnchrotron COSY in Juelich, Germany. The COSY accelerator provides proton and deuteron beams with momenta up to 3.7 GeV/c giving access to hadron physics including the strange quark sector. The WASA-at-COSY physics program focuses on light meson decays where rare decays are used to scrutinize symmetries and symmetry breaking. The structure of hadrons is probed with transition form factors and hadron spectroscopy while hadron dynamics is studied via reaction dynamics and few body reactions. Goals and status are reported with special emphasis on the meson Dalitz decays.
NASA Technical Reports Server (NTRS)
1993-01-01
This report summarizes research conducted at the Institute for Computer Applications in Science and Engineering in applied mathematics and computer science during the period April 1, 1993 through September 30, 1993. The major categories of the current ICASE research program are: (1) applied and numerical mathematics, including numerical analysis and algorithm development; (2) theoretical and computational research in fluid mechanics in selected areas of interest to LaRC, including acoustic and combustion; (3) experimental research in transition and turbulence and aerodynamics involving LaRC facilities and scientists; and (4) computer science.
NASA Technical Reports Server (NTRS)
1994-01-01
This report summarizes research conducted at the Institute for Computer Applications in Science and Engineering in applied mathematics, fluid mechanics, and computer science during the period October 1, 1993 through March 31, 1994. The major categories of the current ICASE research program are: (1) applied and numerical mathematics, including numerical analysis and algorithm development; (2) theoretical and computational research in fluid mechanics in selected areas of interest to LaRC, including acoustics and combustion; (3) experimental research in transition and turbulence and aerodynamics involving LaRC facilities and scientists; and (4) computer science.
7 CFR 1493.200 - General statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program... (CCC) Facility Guarantee Program (FGP). CCC will issue facility payment guarantees for project... so, will be incorporated by reference on the face of the facility payment guarantee issued by CCC. ...
7 CFR 1493.200 - General statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program... (CCC) Facility Guarantee Program (FGP). CCC will issue facility payment guarantees for project... so, will be incorporated by reference on the face of the facility payment guarantee issued by CCC. ...
7 CFR 1493.200 - General statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program... (CCC) Facility Guarantee Program (FGP). CCC will issue facility payment guarantees for project... so, will be incorporated by reference on the face of the facility payment guarantee issued by CCC. ...
Development of alternative wood-post MGS approach guardrail transition.
DOT National Transportation Integrated Search
2011-11-28
The objective of this study was to develop a wood-post MGS approach transition system that is equivalent to the : simplified steel-post, MGS stiffness transition recently developed at the Midwest Roadside Safety Facility. An extensive : literature re...
Space Weather Modeling at the Community Coordinated Modeling Center
NASA Technical Reports Server (NTRS)
Hesse M.
2005-01-01
The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership, which aims at the creation of next generation space weather models. The goal of the CCMC is to support the research and developmental work necessary to substantially increase the present-day modeling capability for space weather purposes, and to provide models for transition to the rapid prototyping centers at the space weather forecast centers. This goal requires dose collaborations with and substantial involvement of the research community. The physical regions to be addressed by CCMC-related activities range from the solar atmosphere to the Earth's upper atmosphere. The CCMC is an integral part of the National Space Weather Program Implementation Plan, of NASA's Living With a Star (LWS) initiative, and of the Department of Defense Space Weather Transition Plan. CCMC includes a facility at NASA Goddard Space Flight Center, as well as distributed computing facilities provided by the US Air Force. CCMC also provides, to the research community, access to state-of-the-art space research models. In this paper we will provide updates on CCMC status, on current plans, research and development accomplishments and goals, and on the model testing and validation process undertaken as part of the CCMC mandate. Special emphasis will be on solar and heliospheric models currently residing at CCMC, and on plans for validation and verification.
2013-07-19
CAPE CANAVERAL, Fla. – NASA’s Kennedy Space Center in Florida has signed a new partnership agreement with Ballistic Recovery Systems Inc., or BRS Aerospace of Miami, Fla., for use of the Parachute Refurbishment Facility, or PRF. From left, are Rob Salonen, director of Business Development with the Economic Development Commission, EDC, of Florida’s Space Coast Jim Barfield, EDC treasurer Larry Williams, president and CEO of BRS Aerospace and Center Director Bob Cabana. The PRF previously was used during NASA’s Space Shuttle Program to manufacture and refurbish the solid rocket booster parachutes. Because of NASA’s transition from the shuttle to future commercial and government mission activities, the agreement allows NASA to preserve the unique facility capabilities for future spaceflight projects. Kennedy’s Center Planning and Development team and the Economic Development Commission of Florida’s Space Coast worked with BRS Aerospace to establish the agreement. For more information about BRS Aerospace, visit http://www.brsparachutes.com. Photo credit: NASA/Jim Grossmann
V/STOL and STOL ground effects and testing techniques
NASA Technical Reports Server (NTRS)
Kuhn, R. E.
1987-01-01
The ground effects associated with V/STOL operation were examined and an effort was made to develop the equipment and testing techniques needed for that understanding. Primary emphasis was on future experimental programs in the 40 x 80 and the 80 x 120 foot test sections and in the outdoor static test stand associated with these facilities. The commonly used experimental techniques are reviewed and data obtained by various techniques are compared with each other and with available estimating methods. These reviews and comparisons provide insight into the limitations of past studies and the testing techniques used and identify areas where additional work is needed. The understanding of the flow mechanics involved in hovering and in transition in and out of ground effect is discussed. The basic flow fields associated with hovering, transition and STOL operation of jet powered V/STOL aircraft are depicted.
Suicide Risk in Nursing Homes and Assisted Living Facilities: 2003-2011.
Mezuk, Briana; Lohman, Matthew; Leslie, Marc; Powell, Virginia
2015-07-01
We investigated the epidemiology of suicide among adults aged 50 years and older in nursing homes and assisted living facilities and whether anticipating transitioning into long-term care (LTC) is a risk factor for suicide. Data come from the Virginia Violent Death Reporting System (2003-2011). We matched locations of suicides (n = 3453) against publicly available resource registries of nursing homes (n = 285) and assisted living facilities (n = 548). We examined individual and organizational correlates of suicide by logistic regression. We identified decedents anticipating entry into LTC through qualitative text analysis. Incidence of suicide was 14.16 per 100 000 in nursing homes and 15.66 in the community. Better performance on Nursing Home Compare quality metrics was associated with higher odds of suicide in nursing homes (odds ratio [OR] = 1.95; 95% confidence interval [CI] = 1.21, 3.14). Larger facility size was associated with higher suicide risk in assisted living facilities (OR = 1.01; 95% CI = 1.00, 1.01). Text narratives identified 38 decedents anticipating transitioning into LTC and 16 whose loved one recently transitioned or resided in LTC. LTC may be an important point of engagement in suicide prevention.
Singh, Suneeta; Singh, Kriti; Chhabra, Vibha; Bennett, Sara
2016-01-01
Background With declines in development assistance for health and growing interest in country ownership, donors are increasingly faced with the task of transitioning health programs to local actors towards a path to sustainability. Yet there is little available guidance on how to measure and evaluate the success of a transition and its subsequent effects. This study assesses the transition of the Avahan HIV/AIDS prevention program in India to investigate how preparations for transition affected continuation of program activities post-transition. Methods Two rounds of two surveys were conducted and supplemented by data from government and Avahan Computerized Management Information Systems (CMIS). Exploratory factor analysis was used to develop two measures: 1) transition readiness pre-transition, and 2) institutionalization (i.e. integration of initial program systems into organizational procedures and behaviors) post-transition. A fixed effects model was built to examine changes in key program delivery outcomes over time. An ordinary least square regression was used to assess the relationship between transition readiness and sustainability of service outcomes both directly, and indirectly through institutionalization. Results Transition readiness data revealed 3 factors (capacity, alignment and communication), on a 15-item scale with adequate internal consistency (alpha 0.73). Institutionalization was modeled as a unidimensional construct, and a 12-item scale demonstrated moderate internal consistency (alpha 0.60). Coverage of key populations and condom distribution were sustained compared to pre-transition levels (p<0.01). Transition readiness, but not institutionalization, predicted sustained outcomes post-transition. Transition readiness did not necessarily lead to institutionalization of key program elements one year after transition. Conclusion Greater preparedness prior to transition is important to achieve better service delivery outcomes post-transition. This paper illustrates a methodology to measure transition readiness pre-transition to identify less ready organizations or program components in advance, improving the likelihood of service sustainability. Further research is needed around the conceptualization and development of measures of institutionalization and its effects on long-term program sustainability. PMID:27434542
America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing
NASA Technical Reports Server (NTRS)
Birkenstock, Benjamin; Kauer, Roy
2014-01-01
The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.
49 CFR 28.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 1 2011-10-01 2011-10-01 false Program accessibility: Existing facilities. 28.150....150 Program accessibility: Existing facilities. (a) General. The Department shall operate each program... Department to make each of its existing facilities accessible to and usable by individuals with handicaps; (2...
Cape Cod National Seashore : satellite maintenance facility feasibility study
DOT National Transportation Integrated Search
2010-09-30
This report analyzes the benefits and costs of a potential satellite vehicle maintenance facility on the outer portion of Cape Cod. A satellite facility had been proposed as a means of servicing the local transit vehicles that bring visitors to Cape ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yun, Di, E-mail: diyun1979@xjtu.edu.cn; Xi'an Jiao Tong University, 28 Xian Ning West Road, Xi'an 710049; Mo, Kun
2015-12-15
U–Mo metallic alloys have been extensively used for the Reduced Enrichment for Research and Test Reactors (RERTR) program, which is now known as the Office of Material Management and Minimization under the Conversion Program. This fuel form has also recently been proposed as fast reactor metallic fuels in the recent DOE Ultra-high Burnup Fast Reactor project. In order to better understand the behavior of U–10Mo fuels within the fast reactor temperature regime, a series of annealing and characterization experiments have been performed. Annealing experiments were performed in situ at the Intermediate Voltage Electron Microscope (IVEM-Tandem) facility at Argonne National Laboratorymore » (ANL). An electro-polished U–10Mo alloy fuel specimen was annealed in situ up to 700 °C. At an elevated temperature of about 540 °C, the U–10Mo specimen underwent a relatively slow microstructure transition. Nano-sized grains were observed to emerge near the surface. At the end temperature of 700 °C, the near-surface microstructure had evolved to a nano-crystalline state. In order to clarify the nature of the observed microstructure, Laue diffraction and powder diffraction experiments were carried out at beam line 34-ID of the Advanced Photon Source (APS) at ANL. Phases present in the as-annealed specimen were identified with both Laue diffraction and powder diffraction techniques. The U–10Mo was found to recrystallize due to thermally-induced recrystallization driven by a high density of pre-existing dislocations. A separate in situ annealing experiment was carried out with a Focused Ion Beam processed (FIB) specimen. A similar microstructure transition occurred at a lower temperature of about 460 °C with a much faster transition rate compared to the electro-polished specimen. - Highlights: • TEM annealing experiments were performed in situ at the IVEM facility up to fast reactor temperature. • At 540 °C, the U-10Mo specimen underwent a slow microstructure transition where nano-sized grains were observed to emerge. • UO{sub 2} phase exists at the thin area of the as-annealed specimen whereas U-10Mo γ phase dominated at the thicker part. • Bcc γ U-10Mo recrystallized to become nano-meter sized crystallites near the specimen surface. • A separateannealing experiment was conducted with a FIB processed specimen where similar transition occurred at a lower temperature of 460 °C with a faster rate.« less
75 FR 67751 - Medicare Program: Community-Based Care Transitions Program (CCTP) Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
...] Medicare Program: Community-Based Care Transitions Program (CCTP) Meeting AGENCY: Centers for Medicare... guidance and ask questions about the upcoming Community-based Care Transitions Program. The meeting is open... registration information will be posted on the CMS Care Transitions Web site at http://www.cms.gov/DemoProjects...
2007-01-30
KENNEDY SPACE CENTER, FLA. -- Skip Hatfield, Orion Project manager, addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. Seated on the dais at right are representatives from NASA, Lockheed Martin, Space Florida and the state of Florida: Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center, Cleon Lacefield, Lockheed Martin program manager; Thad Altman, representative of the State of Florida; Bill Parsons, director of Kennedy Space Center; and Steve Koller, executive director of Space Florida. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible for maintenance under the BIA Road Maintenance Program: (1) BIA transportation facilities listed in...
Minority Business Participation in Public/Private Partnerships: A Manual on Joint Development
DOT National Transportation Integrated Search
1986-02-01
The promotion of commercial real estate development projects in and adjacent to transit facilities as a means of generating additional revenues to defray part of local transit agency operating costs also known as transit-related real estate developme...
23 CFR 810.202 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Making Highway Rights-of-Way Available for Mass Transit Projects § 810.202 Applicability... mass transit facilities under the provisions of subparts B and D of this part. Rights-of-way made...
Overview of NASA's Microgravity Materials Research Program
NASA Technical Reports Server (NTRS)
Downey, James Patton; Grugel, Richard
2012-01-01
The NASA microgravity materials program is dedicated to conducting microgravity experiments and related modeling efforts that will help us understand the processes associated with the formation of materials. This knowledge will help improve ground based industrial production of such materials. The currently funded investigations include research on the distribution of dopants and formation of defects in semiconductors, transitions between columnar and dendritic grain morphology, coarsening of phase boundaries, competition between thermally and kinetically favored phases, and the formation of glassy vs. crystalline material. NASA microgravity materials science investigators are selected for funding either through a proposal in response to a NASA Research Announcement or by participation in a team proposing to a foreign agency research announcement. In the latter case, a US investigator participating in a successful proposal to a foreign agency can then apply to NASA for funding of an unsolicited proposal. The program relies on cooperation with other aerospace partners from around the world. The ISS facilities used for these investigations are provided primarily by partnering with foreign agencies and in most cases the US investigators are working as a part of a larger team studying a specific area of materials science. The following facilities are to be utilized for the initial investigations. The ESA provided Low Gradient Facility and the Solidification and Quench Inserts to the Materials Research Rack/Materials Science Laboratory are to be used primarily for creating bulk samples that are directionally solidified or quenched from a high temperature melt. The CNES provided DECLIC facility is used to observe morphological development in transparent materials. The ESA provided Electro-Magnetic Levitator (EML) is designed to levitate, melt and then cool samples in order to study nucleation behavior. The facility provides conditions in which nucleation of the solid is not triggered from the wall and in which fluid flows in the sample can be controlled and manipulated. These conditions allow scientists ideal conditions for understanding the relative amounts and distribution of different phases that form in the solid. Finally, the Coarsening of Solid Liquid Melts hardware allows quenching of low temperature samples in the Microgravity Science Glovebox.
Lee, Hyemin; Park, Jooyoung; Choi, Bokyoung; Yi, Horim; Kim, Seung-Sup
2018-02-27
Previous literature has documented that transgender people may encounter barriers when they use transition-related healthcare services. This study aims to investigate the experiences of transition-related healthcare and the barriers to those services among transgender adults in South Korea. In 2017, we conducted a nationwide cross-sectional survey of 278 transgender adults in South Korea. We assessed the prevalence of transition-related healthcare such as Gender Identity Disorder (GID) diagnosis, hormone therapy, and sex reassignment surgery. To understand the barriers to those procedures, we asked the participants for their reason not to receive each of the three procedures. We also examined their experiences of and reasons for using non-prescribed hormone medication. We found that 91.0% have been diagnosed with GID (N=253/278), 88.0% have received hormone therapy (N=243/276), and 42.4% had any type of sex reassignment surgery (N=115/271). Cost was the most common barrier to transition-related healthcare among the Korean transgender adults. Other common barriers were identified: Negative experiences in healthcare settings, lack of healthcare professionals and facilities, and social stigma against transgender people. Among those who have taken hormone therapy, 25.1% (N=61/243) reported that they had experience of purchasing hormone medication without medical prescription. Our findings suggest that transgender people face barriers to transition-related healthcare in South Korea. These barriers may preclude transgender individuals from safely accessing to transition-related healthcare. Improving access to transition-related healthcare requires institutional interventions including expanding national health insurance coverage on those procedures and providing transition-related training programs for healthcare professionals in South Korea.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-18
... nursing facility (SNF) in the Medicare program, or a nursing facility (NF) in the Medicaid program. These..., as of April 2010, there are 15,713 long-term care (LTC) facilities (commonly referred to as nursing homes) in the U.S. LTC facilities are also referred to as skilled nursing facilities (SNFs) in the...
Sgaier, Sema K; Ramakrishnan, Aparajita; Dhingra, Neeraj; Wadhwani, Alkesh; Alexander, Ashok; Bennett, Sara; Bhalla, Aparajita; Kumta, Sameer; Jayaram, Matangi; Gupta, Pankaj; Piot, Peter K; Bertozzi, Stefano M; Anthony, John
2013-07-01
Developing countries face diminishing development aid and time-limited donor commitments that challenge the long-term sustainability of donor-funded programs to improve the health of local populations. Increasing country ownership of the programs is one solution. Transitioning managerial and financial responsibility for donor-funded programs to governments and local stakeholders represents a highly advanced form of country ownership, but there are few successful examples among large-scale programs. We present a transition framework and describe how it was used to transfer the Bill & Melinda Gates Foundation's HIV/AIDS prevention program, the Avahan program, to the Government of India. Essential features recommended for the transition of donor-funded programs to governments include early planning with the government, aligning donor program components with government structures and funding models prior to transition, building government capacity through active technical and management support, budgeting for adequate support during and after the transition, and dividing the transition into phases to allow time for adjustments and corrections. The transition of programs to governments is an important sustainability strategy for efforts to scale up HIV prevention programs to reach the populations most at risk.
Life Cycle Cost Analysis of Ready Mix Concrete Plant
NASA Astrophysics Data System (ADS)
Topkar, V. M.; Duggar, A. R.; Kumar, A.; Bonde, P. P.; Girwalkar, R. S.; Gade, S. B.
2013-11-01
India, being a developing nation is experiencing major growth in its infrastructural sector. Concrete is the major component in construction. The requirement of good quality of concrete in large quantities can be fulfilled by ready mix concrete batching and mixing plants. The paper presents a technique of applying the value engineering tool life cycle cost analysis to a ready mix concrete plant. This will help an investor or an organization to take investment decisions regarding a ready mix concrete facility. No economic alternatives are compared in this study. A cost breakdown structure is prepared for the ready mix concrete plant. A market survey has been conducted to collect realistic costs for the ready mix concrete facility. The study establishes the cash flow for the ready mix concrete facility helpful in investment and capital generation related decisions. Transit mixers form an important component of the facility and are included in the calculations. A fleet size for transit mixers has been assumed for this purpose. The life cycle cost has been calculated for the system of the ready mix concrete plant and transit mixers.
Follow-up of K2 planet candiates with the LCOGT network
NASA Astrophysics Data System (ADS)
Dragomir, Diana; Bayliss, Daniel; Colón, Knicole; Cochran, William; Zhou, George; Brown, Timothy; Shporer, Avi; Espinoza, Nestor; Fulton, Benjamin
2015-12-01
K2 has proven to be an outstanding successor to the Kepler mission. It has already revealed dozens of new planet candidates, and unlike those found by the primary mission, many of these systems’ host stars are sufficiently bright to allow extensive follow-up observations. This is especially important since each of the K2 observing campaigns are only ~80 days long, leaving the community with the discovery of exciting new systems but often not enough time coverage to enable a thorough characterization of these systems.We are leading a large effort to observe K2 transiting planet candidates with the LCOGT telescope network. LCOGT’s longitudinal coverage, multiple identical telescopes per site and automated queue observing make it an ideal facility for fast, high-precision and multi-color follow-up. Our program focuses on specific aspects of K2 follow-up for which the network is especially powerful: period determination for candidates with fewer than three K2 transits; transit timing variation monitoring to measure planetary masses, orbital parameters and to search for additional planets in multiple systems; and multi-color photometry to vet planet candidates and carry-out preliminary atmospheric spectroscopy.We will present new results for a selection of systems observed so far through this program. These include K2-19, a multi-planet system extremely close to 3:2 resonance and experiencing transit timing variations with amplitudes as large as one hour; EPIC201702477, a long-period planet with only two K2 transits; WASP-47, a system hosting a hot Jupiter and two K2-discovered small planets; and EPIC201637175b, a disintegrating rocky planet.Our program demonstrates that LCOGT is uniquely positioned to be the primary ground-based photometric follow-up resource for K2 exoplanet discoveries, but also for the numerous bright systems that will result from the TESS mission. LCOGT photometry complements ongoing radial velocity and atmospheric spectroscopy efforts to reveal a more complete picture of the bright, nearby exoplanet systems discovered by these missions.
Hustey, Fredric M; Palmer, Robert M
2010-06-01
To determine whether the implementation of an Internet-based communication system improves the amount of essential information conveyed between a skilled nursing facility (SNF) and the emergency department (ED) during patient care transitions. Interventional; before and after. ED of an urban teaching hospital with approximately 55,000 visits per year and a 55-bed subacute free-standing rehabilitation facility (the SNF). All patients transferred from the SNF to the ED over 16 months. An Internet-based communication network with SNF-ED transfer form for communication during patient care transitions. Nine elements of patient information assessed before and after intervention through chart review. changes in efficiency of information transfer and staff satisfaction. Two hundred thirty-four of 237 preintervention and all 276 postintervention care transitions were reviewed. The Internet communication network was used in 78 (26%) of all care transitions, peaking at 40% by the end of the study. There was more critical patient information (1.85 vs 4.29 of 9 elements; P<.001) contained within fewer pages of transfer documents (24.47 vs 5.15; P<.001) after the intervention. Staff satisfaction with communication was higher among ED physicians after the intervention. The use of an Internet-based system increased the amount of information communicated during SNF-ED care transitions and significantly reduced the number of pages in which this information was contained.
Transit Reliability Information Program Participants Guidelines
DOT National Transportation Integrated Search
1981-03-01
The document provides guidelines for participation in the Transit Reliability Information Program (TRIP). TRIP is a government-initiated program designed to assist the transit industry in satisfying its need for transit equipment reliability data. TR...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Charter School Facilities Program? 225.3 Section 225.3 Education Regulations of the Offices of the... ENHANCEMENT FOR CHARTER SCHOOL FACILITIES PROGRAM General § 225.3 What regulations apply to the Credit Enhancement for Charter School Facilities Program? The following regulations apply to the Credit Enhancement...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Charter School Facilities Program? 225.3 Section 225.3 Education Regulations of the Offices of the... ENHANCEMENT FOR CHARTER SCHOOL FACILITIES PROGRAM General § 225.3 What regulations apply to the Credit Enhancement for Charter School Facilities Program? The following regulations apply to the Credit Enhancement...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Charter School Facilities Program? 225.3 Section 225.3 Education Regulations of the Offices of the... ENHANCEMENT FOR CHARTER SCHOOL FACILITIES PROGRAM General § 225.3 What regulations apply to the Credit Enhancement for Charter School Facilities Program? The following regulations apply to the Credit Enhancement...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Charter School Facilities Program? 225.3 Section 225.3 Education Regulations of the Offices of the... ENHANCEMENT FOR CHARTER SCHOOL FACILITIES PROGRAM General § 225.3 What regulations apply to the Credit Enhancement for Charter School Facilities Program? The following regulations apply to the Credit Enhancement...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Charter School Facilities Program? 225.3 Section 225.3 Education Regulations of the Offices of the... ENHANCEMENT FOR CHARTER SCHOOL FACILITIES PROGRAM General § 225.3 What regulations apply to the Credit Enhancement for Charter School Facilities Program? The following regulations apply to the Credit Enhancement...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... skilled nursing facilities, in the Medicare program, and nursing facilities, in the Medicaid program, that... skilled nursing facilities (SNFs) for Medicare and nursing facilities (NFs) for Medicaid. The Federal... services provided by a nursing home are important, Congressional intent about what constitutes ``quality of...
23 CFR 810.206 - Review by the State Highway Agency.
Code of Federal Regulations, 2011 CFR
2011-04-01
....206 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Making Highway Rights-of-Way Available for Mass Transit Projects...-owned mass transit authority the land needed for the proposed facility. A request shall be accompanied...
Rethinking Healthcare Transitions and Policies: Changing and Expanding Roles in Transitional Care
ERIC Educational Resources Information Center
Moreño, Patricienn K.
2014-01-01
The breakdown of care transitions between various healthcare facilities, providers, and services is a major issue in healthcare, and accounts for over US$15 billion in healthcare expenditures annually. The transition between inpatient care and home care is a very delicate period where, too often, chronically ill patients get worse and wind up back…
ERIC Educational Resources Information Center
Modrcin, Matthew J.; And Others
This monograph addresses the transition needs of adolescents with serious emotional disabilities, describing programs in various settings and states. An introductory chapter discusses the concept of transition and outlines service components. Findings from a national survey of 53 transition programs are then presented. Findings indicated that 60%…
Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida
NASA Technical Reports Server (NTRS)
Hall, Carlton R.; Schmalzer, Paul A.; Breininger, David R.; Duncan, Brean W.; Drese, John H.; Scheidt, Doug A.; Lowers, Russ H.; Reyier, Eric A.; Holloway-Adkins, Karen G.; Oddy, Donna M.;
2014-01-01
The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.
Transit Reliability Information Program (TRIP) : Final Technical Report
DOT National Transportation Integrated Search
1984-05-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for rail transit car subsystem reliability information. TRIP provided this assistance through the operation of ...
Transit Reliability Information Program (TRIP) Phase I Report
DOT National Transportation Integrated Search
1981-06-01
The Transit Reliability Information Program (TRIP) is a government initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national reliabil...
Background: Combined sewer systems (CSS) collect rainwater runoff, sewage, and industrial wastewater for transit to treatment facilities. With heavy precipitation, volumes can exceed capacity of treatment facilities, and wastewater discharges directly to receiving waters. These c...
Monitoring and Evaluating the Transition of Large-Scale Programs in Global Health
Bao, James; Rodriguez, Daniela C; Paina, Ligia; Ozawa, Sachiko; Bennett, Sara
2015-01-01
Purpose: Donors are increasingly interested in the transition and sustainability of global health programs as priorities shift and external funding declines. Systematic and high-quality monitoring and evaluation (M&E) of such processes is rare. We propose a framework and related guiding questions to systematize the M&E of global health program transitions. Methods: We conducted stakeholder interviews, searched the peer-reviewed and gray literature, gathered feedback from key informants, and reflected on author experiences to build a framework on M&E of transition and to develop guiding questions. Findings: The conceptual framework models transition as a process spanning pre-transition and transition itself and extending into sustained services and outcomes. Key transition domains include leadership, financing, programming, and service delivery, and relevant activities that drive the transition in these domains forward include sustaining a supportive policy environment, creating financial sustainability, developing local stakeholder capacity, communicating to all stakeholders, and aligning programs. Ideally transition monitoring would begin prior to transition processes being implemented and continue for some time after transition has been completed. As no set of indicators will be applicable across all types of health program transitions, we instead propose guiding questions and illustrative quantitative and qualitative indicators to be considered and adapted based on the transition domains identified as most important to the particular health program transition. The M&E of transition faces new and unique challenges, requiring measuring constructs to which evaluators may not be accustomed. Many domains hinge on measuring “intangibles” such as the management of relationships. Monitoring these constructs may require a compromise between rigorous data collection and the involvement of key stakeholders. Conclusion: Monitoring and evaluating transitions in global health programs can bring conceptual clarity to the transition process, provide a mechanism for accountability, facilitate engagement with local stakeholders, and inform the management of transition through learning. Further investment and stronger methodological work are needed. PMID:26681706
Suicide Risk in Nursing Homes and Assisted Living Facilities: 2003–2011
Lohman, Matthew; Leslie, Marc; Powell, Virginia
2015-01-01
Objectives. We investigated the epidemiology of suicide among adults aged 50 years and older in nursing homes and assisted living facilities and whether anticipating transitioning into long-term care (LTC) is a risk factor for suicide. Methods. Data come from the Virginia Violent Death Reporting System (2003–2011). We matched locations of suicides (n = 3453) against publicly available resource registries of nursing homes (n = 285) and assisted living facilities (n = 548). We examined individual and organizational correlates of suicide by logistic regression. We identified decedents anticipating entry into LTC through qualitative text analysis. Results. Incidence of suicide was 14.16 per 100 000 in nursing homes and 15.66 in the community. Better performance on Nursing Home Compare quality metrics was associated with higher odds of suicide in nursing homes (odds ratio [OR] = 1.95; 95% confidence interval [CI] = 1.21, 3.14). Larger facility size was associated with higher suicide risk in assisted living facilities (OR = 1.01; 95% CI = 1.00, 1.01). Text narratives identified 38 decedents anticipating transitioning into LTC and 16 whose loved one recently transitioned or resided in LTC. Conclusions. LTC may be an important point of engagement in suicide prevention. PMID:25973805
2007-11-01
Engineer- ing Research Laboratory is currently developing a set of facility ‘architec- tural’ programming tools , called Facility ComposerTM (FC). FC...requirements in the early phases of project development. As the facility program, crite- ria, and requirements are chosen, these tools populate the IFC...developing a set of facility “ar- chitectural” programming tools , called Facility Composer (FC), to support the capture and tracking of facility criteria
23 CFR 810.204 - Application by mass transit authority.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Application by mass transit authority. 810.204 Section 810.204 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION... rail or other nonhighway public mass transit facility may submit an application therefor to the State...
DOT National Transportation Integrated Search
2002-01-01
The purpose of the Bicycle Parking Plan for Miami-Dade Transit is to develop recommendations for new and improved bicycle parking facilities at Metrorail stations, park-and-ride lots and other transit hubs. In order to develop recommendations for new...
Urban public transit systems modeling capabilities
DOT National Transportation Integrated Search
1995-02-01
Current national transportation policy places increasing emphasis on multi-modal : solutions involving public transit and high-occupancy vehicle (HOV) facilities : and services. Current traffic simulation/assignment models, however, have only : limit...
NASA Technical Reports Server (NTRS)
1986-01-01
The conceptual designs and programmatics for a Space Station Nonhuman Life Sciences Research Facility (LSRF) are highlighted. Conceptual designs and programmatics encompass an Initial Orbital Capability (IOC) LSRF, a growth or Follow-on Orbital Capability (FOC), and the transitional process required to modify the IOC LSRF to the FOC LSRF.
Kearns, William D; Fozard, James L; Ray, Roger D; Scott, Steven; Jasiewicz, Jan M; Craighead, Jeffrey D; Pagano, Craig V
2016-01-01
Rehabilitation of patients with traumatic brain injury typically includes therapeutic prompts for keeping appointments and adhering to medication regimens. Level of cognitive impairment may significantly affect a traumatic brain injury victim's ability to benefit from text-based prompting. We tested the hypothesis that spatial disorientation as measured by movement path tortuosity during ambulation would be associated with poorer compliance with automated prompts by veterans actively being treated for traumatic brain injury. Clinical polytrauma center. Ten (1 female) veteran patients mean age = 35.4 (SD = 12.4) years. Small group correlational study without random assignment. Fractal Dimension, a measure of movement path tortuosity derived from a GPS logging device used to record casual outdoor ambulation at the start of the study. Compliance with smart home machine-generated therapeutic prompts received during rehabilitation at the James A. Haley Veterans Administration Hospital Polytrauma Transitional Rehabilitation Program. A patient was compliant with a prompt if they transited from where the prompt was presented to the prescribed destination (both within the Polytrauma Transitional Rehabilitation Program) within 30 minutes. Noncompliance was failure to appear at the destination within the allotted time. Fractal dimension was significantly inversely related to overall prompt compliance (r = -0.603, n = 10, P = .032; 1-tailed). The findings support the hypothesis that increased spatial disorientation adversely impacts compliance with automated prompts throughout therapy. The results are consistent with previous studies linking elevated path tortuosity to cognitive impairment and increased risk for falls in assisted living facility residents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PUBLIC TELEVISION STATION DIGITAL TRANSITION GRANT PROGRAM Public Television Station Digital Transition... Station Digital Transition Grant Program (Grant Program) is to enable public television stations serving rural areas to transition from broadcasting in analog to digital, as required under the Federal...
Code of Federal Regulations, 2010 CFR
2010-01-01
... PUBLIC TELEVISION STATION DIGITAL TRANSITION GRANT PROGRAM Public Television Station Digital Transition... Station Digital Transition Grant Program (Grant Program) is to enable public television stations serving rural areas to transition from broadcasting in analog to digital, as required under the Federal...
Transit investments for greenhouse gas and energy reduction program : second assessment report.
DOT National Transportation Integrated Search
2014-08-01
This report is the second assessment of the U.S. Department of Transportation, Federal Transit Administrations Transit Investments for : Greenhouse Gas and Energy Reduction (TIGGER) Program. The TIGGER Program provides capital funds to transit age...
DOT National Transportation Integrated Search
1984-10-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national data ban...
Bennett, Sara; Ozawa, Sachiko; Rodriguez, Daniela; Paul, Amy; Singh, Kriti; Singh, Suneeta
2015-10-01
In low and middle-income countries, programs funded and implemented by international donors frequently transition to local funding and management, yet such processes are rarely evaluated. We reflect upon experience evaluating the transition of a large scale HIV/AIDS prevention program in India, known as Avahan, in order to draw lessons about transition evaluation approaches and implementation challenges. In terms of conceptualizing the transition theory, the evaluation team identified tensions between the idea of institutionalizing key features of the Avahan program, and ensuring program flexibility to promote sustainability. The transition was planned in three rounds allowing for adaptations to transition intervention and program design during the transition period. The assessment team found it important to track these changes in order to understand which strategies and contextual features supported transition. A mixed methods evaluation was employed, combining semi-structured surveys of transitioning entities (conducted pre and post transition), with longitudinal case studies. Qualitative data helped explain quantitative findings. Measures of transition readiness appeared robust, but we were uncertain of the robustness of institutionalization measures. Finally, challenges to the implementation of such an evaluation are discussed. Given the scarceness of transition evaluations, the lessons from this evaluation may have widespread relevance. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.
49 CFR 807.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Program accessibility: Existing facilities. 807... CONDUCTED BY THE NATIONAL TRANSPORTATION SAFETY BOARD § 807.150 Program accessibility: Existing facilities... not— (1) Necessarily require the agency to make each of its existing facilities accessible to and...
10 CFR 611.202 - Advanced Technology Vehicle Manufacturing Facility Award Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Advanced Technology Vehicle Manufacturing Facility Award... TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Facility/Funding Awards § 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program. DOE may issue, under the Advanced Technology Vehicle...
10 CFR 611.202 - Advanced Technology Vehicle Manufacturing Facility Award Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Advanced Technology Vehicle Manufacturing Facility Award... TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Facility/Funding Awards § 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program. DOE may issue, under the Advanced Technology Vehicle...
10 CFR 611.202 - Advanced Technology Vehicle Manufacturing Facility Award Program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Advanced Technology Vehicle Manufacturing Facility Award... TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Facility/Funding Awards § 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program. DOE may issue, under the Advanced Technology Vehicle...
10 CFR 611.202 - Advanced Technology Vehicle Manufacturing Facility Award Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Advanced Technology Vehicle Manufacturing Facility Award... TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Facility/Funding Awards § 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program. DOE may issue, under the Advanced Technology Vehicle...
10 CFR 611.202 - Advanced Technology Vehicle Manufacturing Facility Award Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Advanced Technology Vehicle Manufacturing Facility Award... TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Facility/Funding Awards § 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program. DOE may issue, under the Advanced Technology Vehicle...
76 FR 17842 - Credit Enhancement for Charter School Facilities Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... DEPARTMENT OF EDUCATION Credit Enhancement for Charter School Facilities Program AGENCY: Office of... for Charter School Facilities program (March 11 NIA). This notice makes two corrections to the March...-mail: [email protected] ; or by mail: (Attention: Credit Enhancement for Charter School Facilities...
2011-12-07
CAPE CANAVERAL, Fla. – Space shuttle Discovery sports three replica shuttle main engines (RSMEs) in Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. The RSMEs were installed on Discovery during Space Shuttle Program transition and retirement activities. The replicas are built in the Pratt & Whitney Rocketdyne engine shop at Kennedy to replace the shuttle engines which will be placed in storage to support NASA's Space Launch System, under development. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann
Innovative Test Operations to Support Orion and Future Human Rated Missions
NASA Technical Reports Server (NTRS)
Koenig, William J.; Garcia, Rafael; Harris, Richard F.; See, Michael J.; Van Lear, Benjamin S.; Dobson, Jill M.; Norris, Scott Douglas
2017-01-01
This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.
Space transportation system biomedical operations support study
NASA Technical Reports Server (NTRS)
White, S. C.
1983-01-01
The shift of the Space Transportation System (STS) flight tests of the orbiter vehicle to the preparation and flight of the payloads is discussed. Part of this change is the transition of the medical and life sciences aspects of the STS flight operations to reflect the new state. The medical operations, the life sciences flight experiments support requirements and the intramural research program expected to be at KSC during the operational flight period of the STS and a future space station are analyzed. The adequacy of available facilities, plans, and resources against these future needs are compared; revisions and/or alternatives where appropriate are proposed.
Leonard, Chelsea; Lawrence, Emily; McCreight, Marina; Lippmann, Brandi; Kelley, Lynette; Mayberry, Ashlea; Ladebue, Amy; Gilmartin, Heather; Côté, Murray J; Jones, Jacqueline; Rabin, Borsika A; Ho, P Michael; Burke, Robert
2017-10-23
Adapting promising health care interventions to local settings is a critical component in the dissemination and implementation process. The Veterans Health Administration (VHA) rural transitions nurse program (TNP) is a nurse-led, Veteran-centered intervention designed to improve transitional care for rural Veterans funded by VA national offices for dissemination to other VA sites serving a predominantly rural Veteran population. Here, we describe our novel approach to the implementation and evaluation = the TNP. This is a controlled before and after study that assesses both implementation and intervention outcomes. During pre-implementation, we assessed site context using a mixed method approach with data from diverse sources including facility-level quantitative data, key informant and Veteran interviews, observations of the discharge process, and a group brainstorming activity. We used the Practical Robust Implementation and Sustainability Model (PRISM) to inform our inquiries, to integrate data from all sources, and to identify factors that may affect implementation. In the implementation phase, we will use internal and external facilitation, paired with audit and feedback, to encourage appropriate contextual adaptations. We will use a modified Stirman framework to document adaptations. During the evaluation phase, we will measure intervention and implementation outcomes at each site using the RE-AIM framework (Reach, Effectiveness, Adoption, Implementation, and Maintenance). We will conduct a difference-in-differences analysis with propensity-matched Veterans and VA facilities as a control. Our primary intervention outcome is 30-day readmission and Emergency Department visit rates. We will use our findings to develop an implementation toolkit that will inform the larger scale-up of the TNP across the VA. The use of PRISM to inform pre-implementation evaluation and synthesize data from multiple sources, coupled with internal and external facilitation, is a novel approach to engaging sites in adapting interventions while promoting fidelity to the intervention. Our application of PRISM to pre-implementation and midline evaluation, as well as documentation of adaptations, provides an opportunity to identify and address contextual factors that may impede or enhance implementation and sustainability of health interventions and inform dissemination.
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the...) Requirements. The transition plan must set forth the steps needed to complete the structural changes required... the OCR upon request and to the public for inspection at either the site of the project or at the...
Code of Federal Regulations, 2012 CFR
2012-04-01
... of Property Disposition Program multifamily housing facilities. 9.152 Section 9.152 Housing and Urban... URBAN DEVELOPMENT § 9.152 Program accessibility: alterations of Property Disposition Program multifamily housing facilities. (a) Substantial alteration. If the agency undertakes alterations to a PDP multifamily...
Code of Federal Regulations, 2014 CFR
2014-04-01
... of Property Disposition Program multifamily housing facilities. 9.152 Section 9.152 Housing and Urban... URBAN DEVELOPMENT § 9.152 Program accessibility: alterations of Property Disposition Program multifamily housing facilities. (a) Substantial alteration. If the agency undertakes alterations to a PDP multifamily...
Eco-logical successes : fourth edition, March 2013
DOT National Transportation Integrated Search
2013-03-01
Infrastructure facilities, such as roadways, transit lines, and communication systems, provide vital services that support the healthy functioning of a community. While essential, sometimes the development of these facilities has negative environment...
DOT National Transportation Integrated Search
1981-08-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...
NASA Technical Reports Server (NTRS)
Doggett, William R.
1992-01-01
The topics are presented in viewgraph form and include: automated structures assembly facility current control hierarchy; automated structures assembly facility purposed control hierarchy; end-effector software state transition diagram; block diagram for ideal install composite; and conclusions.
Space Weather Modeling at the Community Coordinated Modeling Center
NASA Astrophysics Data System (ADS)
Hesse, M.; Falasca, A.; Johnson, J.; Keller, K.; Kuznetsova, M.; Rastaetter, L.
2003-04-01
The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership aimed at the creation of next generation space weather models. The goal of the CCMC is to support the research and developmental work necessary to substantially increase the present-day modeling capability for space weather purposes, and to provide models for transition to the rapid prototyping centers at the space weather forecast centers. This goal requires close collaborations with and substantial involvement of the research community. The physical regions to be addressed by CCMC-related activities range from the solar atmosphere to the Earth's upper atmosphere. The CCMC is an integral part of NASA's Living With a Star (LWS) initiative, of the National Space Weather Program Implementation Plan, and of the Department of Defense Space Weather Transition Plan. CCMC includes a facility at NASA Goddard Space Flight Center, as well as distributed computing facilities provided by the US Air Force. CCMC also provides, to the research community, access to state-of-the-art space research models. In this paper we will provide updates on CCMC status, on current plans, research and development accomplishments and goals, and on the model testing and validation process undertaken as part of the CCMC mandate. We will demonstrate the capabilities of models resident at CCMC via the analysis of a geomagnetic storm, driven by a shock in the solar wind.
76 FR 46892 - Agency Information Collection Activity Under OMB Review
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... development and deployment of clean fuel and advanced propulsion technologies for transit buses. To meet... propulsion technologies for transit buses by providing funds for clean fuel vehicles and facilities. To meet...
Assessment of ADA Research and Development Needs
DOT National Transportation Integrated Search
1997-07-01
This report assesses the progress transit systems have made in improving the accessibility of their services and facilities. Specific objectives included the identification of innovative solutions developed by transit systems to meet the accessibilit...
NASA Astrophysics Data System (ADS)
Westfall, Catherine
2018-03-01
This is the second in a three-part article describing the development of the Thomas Jefferson National Accelerator Facility's experimental program, from the first dreams of incisive electromagnetic probes into the structure of the nucleus through the era in which equipment was designed and constructed and a program crafted so that the long-desired experiments could begin. These developments unfolded against the backdrop of the rise of the more bureaucratic New Big Science and the intellectual tumult that grew from increasing understanding and interest in quark-level physics. Part 2, presented here, focuses on the period from 1986 to 1990. During this period of revolutionary change, laboratory personnel, potential users, and DOE officials labored to proceed from the 1986 laboratory design report, which included detailed accelerator plans and very preliminary experimental equipment sketches, to an approved 1990 experimental equipment conceptual design report, which provided designs complete enough for the onset of experimental equipment construction.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Apollo experience report: Real-time auxiliary computing facility development
NASA Technical Reports Server (NTRS)
Allday, C. E.
1972-01-01
The Apollo real time auxiliary computing function and facility were an extension of the facility used during the Gemini Program. The facility was expanded to include support of all areas of flight control, and computer programs were developed for mission and mission-simulation support. The scope of the function was expanded to include prime mission support functions in addition to engineering evaluations, and the facility became a mandatory mission support facility. The facility functioned as a full scale mission support activity until after the first manned lunar landing mission. After the Apollo 11 mission, the function and facility gradually reverted to a nonmandatory, offline, on-call operation because the real time program flexibility was increased and verified sufficiently to eliminate the need for redundant computations. The evaluation of the facility and function and recommendations for future programs are discussed in this report.
Does a voucher program improve reproductive health service delivery and access in Kenya?
Njuki, Rebecca; Abuya, Timothy; Kimani, James; Kanya, Lucy; Korongo, Allan; Mukanya, Collins; Bracke, Piet; Bellows, Ben; Warren, Charlotte E
2015-05-23
Current assessments on Output-Based Aid (OBA) programs have paid limited attention to the experiences and perceptions of the healthcare providers and facility managers. This study examines the knowledge, attitudes, and experiences of healthcare providers and facility managers in the Kenya reproductive health output-based approach voucher program. A total of 69 in-depth interviews with healthcare providers and facility managers in 30 voucher accredited facilities were conducted. The study hypothesized that a voucher program would be associated with improvements in reproductive health service provision. Data were transcribed and analyzed by adopting a thematic framework analysis approach. A combination of inductive and deductive analysis was conducted based on previous research and project documents. Facility managers and providers viewed the RH-OBA program as a feasible system for increasing service utilization and improving quality of care. Perceived benefits of the program included stimulation of competition between facilities and capital investment in most facilities. Awareness of family planning (FP) and gender-based violence (GBV) recovery services voucher, however, remained lower than the maternal health voucher service. Relations between the voucher management agency and accredited facilities as well as existing health systems challenges affect program functions. Public and private sector healthcare providers and facility managers perceive value in the voucher program as a healthcare financing model. They recognize that it has the potential to significantly increase demand for reproductive health services, improve quality of care and reduce inequities in the use of reproductive health services. To improve program functioning going forward, there is need to ensure the benefit package and criteria for beneficiary identification are well understood and that the public facilities are permitted greater autonomy to utilize revenue generated from the voucher program.
DOT National Transportation Integrated Search
2001-01-01
The following progress report is intended to highlight the significant activities of the Florida Transit Training Program and Florida Technical Assistant Program for the 2001 year. Activities of the Florida Statewide Transit Training Program are pres...
MEASURE: An integrated data-analysis and model identification facility
NASA Technical Reports Server (NTRS)
Singh, Jaidip; Iyer, Ravi K.
1990-01-01
The first phase of the development of MEASURE, an integrated data analysis and model identification facility is described. The facility takes system activity data as input and produces as output representative behavioral models of the system in near real time. In addition a wide range of statistical characteristics of the measured system are also available. The usage of the system is illustrated on data collected via software instrumentation of a network of SUN workstations at the University of Illinois. Initially, statistical clustering is used to identify high density regions of resource-usage in a given environment. The identified regions form the states for building a state-transition model to evaluate system and program performance in real time. The model is then solved to obtain useful parameters such as the response-time distribution and the mean waiting time in each state. A graphical interface which displays the identified models and their characteristics (with real time updates) was also developed. The results provide an understanding of the resource-usage in the system under various workload conditions. This work is targeted for a testbed of UNIX workstations with the initial phase ported to SUN workstations on the NASA, Ames Research Center Advanced Automation Testbed.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
42 CFR 413.335 - Basis of payment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Facilities § 413.335 Basis of payment. (a) Method of payment. Under the prospective payment system, SNFs... and, during a transition period, on the basis of a blend of the Federal rate and the facility-specific...
EPA Facility Registry Service (FRS): CAMDBS
This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Clean Air Markets Division Business System (CAMDBS). Administered by the EPA Clean Air Markets Division, within the Office of Air and Radiation, CAMDBS supports the implementation of market-based air pollution control programs, including the Acid Rain Program and regional programs designed to reduce the transport of ozone. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to CAMDBS facilities once the CAMDBS data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.
Turner, Jason S; Broom, Kevin D; Counte, Michael A
2015-01-01
Recent US legislation is attempting to transition inpatient Medicare payments to a value-based purchasing (VBP) program. The VBP program is a pay-for-performance (P4P) system that incentivizes hospitals to improve patient satisfaction, health outcomes, and adherence to clinical protocols while simultaneously holding down costs. Our study evaluates (1) the impact of financial performance on the VBP adjustments and (2) whether there is a correlation between the VBP adjustment and the financial performance of Missouri hospitals that opted into the program. While upward and downward adjustments to the inpatient base rate may be related to hospital financial performance, prior financial performance may also be related to the adjustments. Financial health may allow facilities to invest and position the hospital for favorable future P4P adjustments. The results of our analysis indicate the VBP adjustment to the inpatient base rate is very small (±0.18%), clustered around zero, and is not correlated with financial performance. We also find that financial performance and improvement in the years prior to the adjustment are not related to the VBP adjustment or its respective components. This suggests that CMS is avoiding penalizing less profitable facilities, but the adjustment is also so small and tightly clustered around zero that it is failing to provide an adequate incentive to hospitals. The costs of improving patient satisfaction, clinical process adherence, health care outcomes, and efficiency above that of peers coupled with the growing number of metrics being used to calculate the VBP adjustments call into question the financial incentives of the hospital VBP program.
ERIC Educational Resources Information Center
Beltran, Celestino M.; And Others
The Urban Mass Transportation Association promotes Commercial real estate development projects in and adjacent to transit facilities as a means of generating additional revenues to defray part of local transit agency operating cost. Transit-related real estate development, or joint development, provides unique financial benefits for investors and…
Code of Federal Regulations, 2010 CFR
2010-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...
25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...
25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...
25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...
25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...
78 FR 45983 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; withdrawal... withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based... determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle...
5 CFR 1207.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... facilities. 1207.150 Section 1207.150 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION... CONDUCTED BY THE MERIT SYSTEMS PROTECTION BOARD § 1207.150 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or activity so that the program or activity, when viewed in...
Under National Pollutant Discharge Elimination System permit number DC0000337, the Washington Metropolitan Area Transit Authority (WMATA) is authorized to dischargefrom a facility to receiving waters named Oxon Run.
Accessibility handbook for transit facilities
DOT National Transportation Integrated Search
This document is a handbook that will help architects, engineers, and transit system managers to understand and follow : the Federal Government regulations contained in the Final Rule, 49 CFR Part 37, which describes the requirements for : transporta...
Unroe, Kathleen T; Nazir, Arif; Holtz, Laura R; Maurer, Helen; Miller, Ellen; Hickman, Susan E; La Mantia, Michael A; Bennett, Merih; Arling, Greg; Sachs, Greg A
2015-01-01
The Optimizing Patient Transfers, Impacting Medical Quality, and Improving Symptoms: Transforming Institutional Care (OPTIMISTIC) project aims to reduce avoidable hospitalizations of long-stay residents enrolled in 19 central Indiana nursing facilities. This clinical demonstration project, funded by the Centers for Medicare and Medicaid Services Innovations Center, places a registered nurse in each nursing facility to implement an evidence-based quality improvement program with clinical support from nurse practitioners. A description of the model is presented, and early implementation experiences during the first year of the project are reported. Important elements include better medical care through implementation of Interventions to Reduce Acute Care Transfers tools and chronic care management, enhanced transitional care, and better palliative care with a focus on systematic advance care planning. There were 4,035 long-stay residents in 19 facilities enrolled in OPTIMISTIC between February 2013 and January 2014. Root-cause analyses were performed for all 910 acute transfers of these long stay residents. Of these transfers, the project RN evaluated 29% as avoidable (57% were not avoidable and 15% were missing), and opportunities for quality improvement were identified in 54% of transfers. Lessons learned in early implementation included defining new clinical roles, integrating into nursing facility culture, managing competing facility priorities, communicating with multiple stakeholders, and developing a system for collecting and managing data. The success of the overall initiative will be measured primarily according to reduction in avoidable hospitalizations of long-stay nursing facility residents. © 2014, Copyright the Authors Journal compilation © 2014, The American Geriatrics Society.
2018-04-03
The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved inside the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
2018-02-12
NASA's Transiting Exoplanet Survey Satellite (TESS) container is pressure washed at the Multi-Payload Processing Facility at the agency's Kennedy Space Center in Florida. Tess will be moved to the Payload Hazardous Servicing Facility to be processed and prepared for flight. TESS is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station. TESS is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
2018-04-03
The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is being moved to the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
2007-01-30
KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center Director Bill Parsons addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. At right is Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center. Other representatives from NASA, Lockheed Martin, Space Florida and the state of Florida also attended. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morrell, Sean Robert; Rynes, Amanda Renee
2014-07-01
There are currently over 900 facilities in over 170 countries which fall under International Atomic Energy Agency (IAEA) safeguards. As additional nations look to purse civilian nuclear programs or to expand infrastructure already in place, the number of reactors and accompanying facilities as well as the quantity of material has greatly increased. Due to the breadth of the threat and the burden placed on the IAEA as nuclear applications expand, it has become increasingly important that safeguards professionals have a strong understanding of both the technical and political aspects of nonproliferation starting early in their career. To begin overcoming thismore » challenge, Idaho National Laboratory, has partnered with local universities to deliver a graduate level nuclear engineering course that covers both aspects of the field with a focus on safeguards applications. To date over 60 students across multiple disciplines have participated in this course with many deciding to transition into a nonproliferation area of focus in both their academic and professional careers.« less
NASA Astrophysics Data System (ADS)
Casner, A.; Liberatore, S.; Masse, L.; Martinez, D.; Haan, S. W.; Kane, J.; Moore, A. S.; Seugling, R.; Farrell, M.; Giraldez, E.; Nikroo, A.; Smalyuk, V. A.; Remington, B. A.
2016-05-01
Under the Discovery Science program, the longer pulses and higher laser energies provided by the National Ignition Facility (NIF) have been harnessed to study, first time in indirect-drive, the highly nonlinear stage of the Rayleigh-Taylor Instability (RTI) at the ablation front. A planar plastic package with pre-imposed two-dimensional broadband modulations is accelerated for up to 12 ns by the x-ray drive of a gas-filled gold radiation cavity with a radiative temperature plateau at 175 eV. This extended tailored drive allows a distance traveled in excess of 1 mm for a 130 μm thick foil, a factor 3x larger than previously achieved on other laser facilities. As a consequence, we have measured the ablative RTI in transition from the weakly nonlinear stage up to the deep nonlinear stage for various initial conditions. A bubble merger regime has been observed and the ablative stabilization strength varied by changing the plastic dopant from iodine to germanium.
Roles of Engineering Correlations in Hypersonic Entry Boundary Layer Transition Prediction
NASA Technical Reports Server (NTRS)
Campbell, Charles H.; Anderson, Brian P.; King, Rudolph A.; Kegerise, Michael A.; Berry, Scott A.; Horvath, Thomas J.
2010-01-01
Efforts to design and operate hypersonic entry vehicles are constrained by many considerations that involve all aspects of an entry vehicle system. One of the more significant physical phenomenon that affect entry trajectory and thermal protection system design is the occurrence of boundary layer transition from a laminar to turbulent state. During the Space Shuttle Return To Flight activity following the loss of Columbia and her crew of seven, NASA's entry aerothermodynamics community implemented an engineering correlation based framework for the prediction of boundary layer transition on the Orbiter. The methodology for this implementation relies upon similar correlation techniques that have been is use for several decades. What makes the Orbiter boundary layer transition correlation implementation unique is that a statistically significant data set was acquired in multiple ground test facilities, flight data exists to assist in establishing a better correlation and the framework was founded upon state of the art chemical nonequilibrium Navier Stokes flow field simulations. Recent entry flight testing performed with the Orbiter Discovery now provides a means to validate this engineering correlation approach to higher confidence. These results only serve to reinforce the essential role that engineering correlations currently exercise in the design and operation of entry vehicles. The framework of information related to the Orbiter empirical boundary layer transition prediction capability will be utilized to establish a fresh perspective on this role, and to discuss the characteristics which are desirable in a next generation advancement. The details of the paper will review the experimental facilities and techniques that were utilized to perform the implementation of the Orbiter RTF BLT Vsn 2 prediction capability. Statistically significant results for multiple engineering correlations from a ground testing campaign will be reviewed in order to describe why only certain correlations were selected for complete implementation to support the Shuttle Program. Historical Orbiter flight data on early boundary layer transition due to protruding gap fillers will be described in relation to the selected empirical correlations. In addition, Orbiter entry flight testing results from the BLT Flight Experiment will be discussed in relation to these correlations. Applicability of such correlations to the entry design problem will be reviewed, and finally a perspective on the desirable characteristics for a next generation capability based on high fidelity physical models will be provided.
Innes, Tiana; Calleja, Pauline
2018-05-01
Transition into critical care areas for new graduate nurses may be more difficult than transitioning into other areas due to the specialised knowledge needed. It is unknown which aspects of transition programs best support new graduate nurses improve competence and confidence to transition into critical care nursing specialties. Identifying these aspects would assist to design and implement best practice transition programs for new graduates in critical care areas. Themes identified in the literature include; having a designated resource person, workplace culture, socialisation, knowledge and skill acquisition, orientation, and rotation. Allocation of a quality resource person/s, supportive workplace culture, positive socialisation experiences, knowledge and skill acquisition and structured orientation based on new graduates' learning needs all positively supported increased confidence, competence and transition into nursing practice. Rotations between areas within graduate programs can potentially have both positive and negative impacts on the transition process. Negative impacts of including a rotation component in a transition program should be carefully considered alongside perceived benefits when designing new graduate nurse transition programs. Copyright © 2018. Published by Elsevier Ltd.
Wewiorski, Nancy J; Gorman, Jay A; Scoglio, Arielle A J; Fukuda, Seiya; Reilly, Erin; Mueller, Lisa; O'Connor, Maureen; Penk, Walter E; Drebing, Charles E
2018-05-01
Supporting returning veterans' job-seeking, hiring, and retention issues has become an essential goal for effective community reintegration. Given both the particular strengths and challenges associated with veterans transitioning from military to civilian life, multiple models for supported employment have become integrated into Veterans Affairs health care facilities across the nation. In this article, we review the state of vocational rehabilitation for veterans, with a particular focus on individual placement and support-supported employment (IPS-SE), the current vocational services model that is considered the gold standard of vocational rehabilitation. Various modifications to the IPS-SE model are presented, including additions such as cognitive rehabilitation, contingency management, motivational interviewing, supported self-employment, and transitional work. Finally, recommendations are made about future directions and strategies to expand access to IPS-SE-based programs and to effectively meet the needs of returning veterans for employment in jobs of their choice. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
ERIC Educational Resources Information Center
Pinnell, Charles; Wacholder, Michael
The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…
Chappell, Kathy B; Richards, Kathy C
2015-01-01
This systematic review evaluated the relationship between new graduate nurses and clinical leadership skill, and between new graduate nurse transition programs and clinical leadership skill. New graduate nurse transition programs have been cited as one strategy to improve clinical leadership skill, but to our knowledge, no one has synthesized the evidence on new graduate nurse transition programs and clinical leadership skill. Results of this review showed that new graduate nurse transition programs that were at least 24 weeks in length had a positive impact on clinical leadership skill. New graduate nurse transition programs using the University HealthSystem Consortium/American Association of Colleges of Nursing Nurse Residency curriculum had the greatest impact, followed by curriculum developed by the Versant New Graduate RN Residency, an important finding for nursing professional development specialists.
Aeropropulsion facilities configuration control: Procedures manual
NASA Technical Reports Server (NTRS)
Lavelle, James J.
1990-01-01
Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.
2007-01-30
KENNEDY SPACE CENTER, FLA. -- After a ceremony to commemorate the transition of the historic Operations and Checkout (O&C) Building high bay for use by the Constellation Program, representatives from NASA, Lockheed Martin, Space Florida and the state of Florida look at the banner, unfurled by Kennedy Space Center Director Bill Parsons (center), spotlighting the Orion crew exploration vehicle that will be assembled in the O&C. From left are Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center; Thad Altman, representative of the State of Florida; Cleon Lacefield, Lockheed Martin program manager; Parsons; Steve Koller, executive director of Space Florida (turned away); and Skip Hatfield, Orion Project manager. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Evaluation of flow quality in two large NASA wind tunnels at transonic speeds
NASA Technical Reports Server (NTRS)
Harvey, W. D.; Stainback, P. C.; Owen, F. K.
1980-01-01
Wind tunnel testing of low drag airfoils and basic transition studies at transonic speeds are designed to provide high quality aerodynamic data at high Reynolds numbers. This requires that the flow quality in facilities used for such research be excellent. To obtain a better understanding of the characteristics of facility disturbances and identification of their sources for possible facility modification, detailed flow quality measurements were made in two prospective NASA wind tunnels. Experimental results are presented of an extensive and systematic flow quality study of the settling chamber, test section, and diffuser in the Langley 8 foot transonic pressure tunnel and the Ames 12 foot pressure wind tunnel. Results indicate that the free stream velocity and pressure fluctuation levels in both facilities are low at subsonic speeds and are so high as to make it difficult to conduct meaningful boundary layer control and transition studies at transonic speeds.
ERIC Educational Resources Information Center
Macconnell, James D., And Others
The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…
Older Persons’ Transitions in Care (OPTIC): a study protocol
2012-01-01
Background Changes in health status, triggered by events such as infections, falls, and geriatric syndromes, are common among nursing home (NH) residents and necessitate transitions between NHs and Emergency Departments (EDs). During transitions, residents frequently experience care that is delayed, unnecessary, not evidence-based, potentially unsafe, and fragmented. Furthermore, a high proportion of residents and their family caregivers report substantial unmet needs during transitions. This study is part of a program of research whose overall aim is to improve quality of care for frail older adults who reside in NHs. The purpose of this study is to identify successful transitions from multiple perspectives and to identify organizational and individual factors related to transition success, in order to inform improvements in care for frail elderly NH residents during transitions to and from acute care. Specific objectives are to: 1. define successful and unsuccessful elements of transitions from multiple perspectives; 2. develop and test a practical tool to assess transition success; 3. assess transition processes in a discrete set of transfers in two study sites over a one year period; 4. assess the influence of organizational factors in key practice locations, e.g., NHs, emergency medical services (EMS), and EDs, on transition success; and 5. identify opportunities for evidence-informed management and quality improvement decisions related to the management of NH – ED transitions. Methods/Design This is a mixed-methods observational study incorporating an integrated knowledge translation (IKT) approach. It uses data from multiple levels (facility, care unit, individual) and sources (healthcare providers, residents, health records, and administrative databases). Discussion Key to study success is operationalizing the IKT approach by using a partnership model in which the OPTIC governance structure provides for team decision-makers and researchers to participate equally in developing study goals, design, data collection, analysis and implications of findings. As preliminary and ongoing study findings are developed, their implications for practice and policy in study settings will be discussed by the research team and shared with study site administrators and staff. The study is designed to investigate the complexities of transitions and to enhance the potential for successful and sustained improvement of these transitions. PMID:23241360
Real-time aerodynamic heating and surface temperature calculations for hypersonic flight simulation
NASA Technical Reports Server (NTRS)
Quinn, Robert D.; Gong, Leslie
1990-01-01
A real-time heating algorithm was derived and installed on the Ames Research Center Dryden Flight Research Facility real-time flight simulator. This program can calculate two- and three-dimensional stagnation point surface heating rates and surface temperatures. The two-dimensional calculations can be made with or without leading-edge sweep. In addition, upper and lower surface heating rates and surface temperatures for flat plates, wedges, and cones can be calculated. Laminar or turbulent heating can be calculated, with boundary-layer transition made a function of free-stream Reynolds number and free-stream Mach number. Real-time heating rates and surface temperatures calculated for a generic hypersonic vehicle are presented and compared with more exact values computed by a batch aeroheating program. As these comparisons show, the heating algorithm used on the flight simulator calculates surface heating rates and temperatures well within the accuracy required to evaluate flight profiles for acceptable heating trajectories.
NASA Technical Reports Server (NTRS)
1990-01-01
This report contains the individual presentations delivered at the Space Station Evolution Symposium in League City, Texas on February 6, 7, 8, 1990. Personnel responsible for Advanced Systems Studies and Advanced Development within the Space Station Freedom Program reported on the results of their work to date. Systems Studies presentations focused on identifying the baseline design provisions (hooks and scars) necessary to enable evolution of the facility to support changing space policy and anticipated user needs. Also emphasized were evolution configuration and operations concepts including on-orbit processing of space transfer vehicles. Advanced Development task managers discussed transitioning advanced technologies to the baseline program, including those near-term technologies which will enhance the safety and productivity of the crew and the reliability of station systems. Special emphasis was placed on applying advanced automation technology to ground and flight systems.
Low-gravity fluid physics: A program overview
NASA Technical Reports Server (NTRS)
1990-01-01
An overview is presented of the microgravity fluid physics program at Lewis Research Center. One of the main reasons for conducting low gravity research in fluid physics is to study phenomena such as surface tension, interfacial contact angles, and diffusion independent of such gravitationally induced effects as buoyant convection. Fluid physics is at the heart of many space-based technologies including power systems, thermal control systems, and life support systems. Fundamental understanding of fluid physics is a key ingredient to successful space systems design. In addition to describing ground-based and space-based low-gravity facilities, selected experiments are presented which highlight Lewis work in fluid physics. These experiments can be categorized into five theme areas which summarize the work being conducted at Lewis for OSSA: (1) isothermal/iso-solutal capillary phenomena; (2) capillary phenomena with thermal/solutal gradients; (3) thermal-solutal convection; (4) first- and second-order phase transitions in a static fluid; and (5) multiphase flow.
EBIT - Electronic Beam Ion Trap: N Divison experimental physics annual report 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, D.
1996-10-01
The multi-faceted research effort of the EBIT (Electron Beam Ion Trap) program in N-Division of the Physics and Space Technology Department at Lawrence Livermore National Laboratory (LLNL) continues to contribute significant results to the physical sciences from studies with low energy very highly charged heavy ions. The EBIT program attracts a number of collaborators from the US and abroad for the different projects. The collaborations are partly carried out through participating graduate students demonstrating the excellent educational capabilities at the LLNL EBIT facilities. Moreover, participants from Historically Black Colleges and Universities are engaged in the EBIT project. This report describesmore » EBIT work for 1995 in atomic structure measurements and radiative transition probabilities, spectral diagnostics for laboratory and astrophysical plasmas, ion/surface interaction studies, electron-ion interactions studies, retrap and ion collisions, and instrumental development.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The following are reported: theoretical calculations (configuration interaction, relativistic effective core potentials, polyatomics, CASSCF); proposed theoretical studies (clusters of Cu, Ag, Au, Ni, Pt, Pd, Rh, Ir, Os, Ru; transition metal cluster ions; transition metal carbide clusters; bimetallic mixed transition metal clusters); reactivity studies on transition metal clusters (reactivity with H{sub 2}, C{sub 2}H{sub 4}, hydrocarbons; NO and CO chemisorption on surfaces). Computer facilities and codes to be used, are described. 192 refs, 13 figs.
NPDES Permit for Transit Waste's Bondad Landfill in Colorado
Under National Pollutant Discharge Elimination System permit number CO-R050005, Transit Waste, LLC is authorized to discharge from the Bondad Landfill facility in La Plata County, Colorado, to an unnamed tributary of the Animas River.
Market Based Transit Facility Design
DOT National Transportation Integrated Search
1989-02-01
The purpose of this report is to provide guidelines for the planning and design of transit stations, stops, and terminals. These guidelines have been prepared form a market-based point of view. Design elements are suggested that directly relate promo...
Medical surveillance and programs on industrial hygiene at RCRA facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Murphy, T.E.
1994-12-31
Some special areas where much progress in industrial hygiene and safety has been made in the past few years are; training, personal protective equipment, uniforms, personal monitoring, area monitoring, and medical surveillance. Before one can begin to construct programs for worker protection, some knowledge of potential exposures must be gained. The best place to start is the Waste Analysis Plan, and the list of wastes that a particular site is authorized to receive. Waste Codes are listed within a facility`s Part A and Part B permits. Actual facility receipt of wastes are well documented within Load Records and other documentation.more » A facility`s training program forms the heart of a health and safety program. Every TSD facility should have developed a matrix of job titles and required training. Every facility must also make a commitment to providing a wide range of personal protective equipment, including a wide array of disposables. Some facilities will benefit from the occasional use of the newer respirator quantitative fit-testing devices. All facilities are urged to rent or borrow this type of equipment periodically. Quantitative respirator fit-testers are capable of revealing important deficiencies in a respirator program. Providing uniforms is a newer means of protecting workers. The use of uniforms is an effective means for addressing the idea of carry-home-waste. The use of disposables including boots, must be integrated into a Uniform Program if the program is to be effective. In addition, employees must strictly understand that uniforms must not leave the facility at any time, including lunch time.« less
28 CFR 550.56 - Community Transitional Drug Abuse Treatment Program (TDAT).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Community Transitional Drug Abuse... JUSTICE INSTITUTIONAL MANAGEMENT DRUG PROGRAMS Drug Abuse Treatment Program § 550.56 Community Transitional Drug Abuse Treatment Program (TDAT). (a) For inmates to successfully complete all components of...
28 CFR 550.56 - Community Transitional Drug Abuse Treatment Program (TDAT).
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Community Transitional Drug Abuse... JUSTICE INSTITUTIONAL MANAGEMENT DRUG PROGRAMS Drug Abuse Treatment Program § 550.56 Community Transitional Drug Abuse Treatment Program (TDAT). (a) For inmates to successfully complete all components of...
28 CFR 550.56 - Community Transitional Drug Abuse Treatment Program (TDAT).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Community Transitional Drug Abuse... JUSTICE INSTITUTIONAL MANAGEMENT DRUG PROGRAMS Drug Abuse Treatment Program § 550.56 Community Transitional Drug Abuse Treatment Program (TDAT). (a) For inmates to successfully complete all components of...
28 CFR 550.56 - Community Transitional Drug Abuse Treatment Program (TDAT).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Community Transitional Drug Abuse... JUSTICE INSTITUTIONAL MANAGEMENT DRUG PROGRAMS Drug Abuse Treatment Program § 550.56 Community Transitional Drug Abuse Treatment Program (TDAT). (a) For inmates to successfully complete all components of...
28 CFR 550.56 - Community Transitional Drug Abuse Treatment Program (TDAT).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Community Transitional Drug Abuse... JUSTICE INSTITUTIONAL MANAGEMENT DRUG PROGRAMS Drug Abuse Treatment Program § 550.56 Community Transitional Drug Abuse Treatment Program (TDAT). (a) For inmates to successfully complete all components of...
78 FR 41786 - Applications for New Awards; Education Facilities Clearinghouse Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... DEPARTMENT OF EDUCATION Applications for New Awards; Education Facilities Clearinghouse Program AGENCY: Office of Elementary and Secondary Education, Department of Education. ACTION: Notice. Overview Information: Education Facilities Clearinghouse Program. Notice inviting applications for new awards for...
An Evaluation of the Technical Adequacy of a Revised Measure of Quality Indicators of Transition
ERIC Educational Resources Information Center
Morningstar, Mary E.; Lee, Hyunjoo; Lattin, Dana L.; Murray, Angela K.
2016-01-01
This study confirmed the reliability and validity of the Quality Indicators of Exemplary Transition Programs Needs Assessment-2 (QI-2). Quality transition program indicators were identified through a systematic synthesis of transition research, policies, and program evaluation measures. To verify reliability and validity of the QI-2, we…
DOE Office of Scientific and Technical Information (OSTI.GOV)
McIntosh, Gordon; Indermuehle, Balthasar, E-mail: mcintogc@morris.umn.edu, E-mail: balt.indermuehle@csiro.au
We present an analysis of velocity parameters derived from multi-epoch observations of the SiO maser spectra of 47 long period variables (LPVs). The velocity parameters are important to inform and constrain theoretical models of SiO maser emission and to extract information on binary orbits. Mira and R Aquarii (R Aqr) are two known binaries included in the program. The 47 LPVs are among 121 sources of the Australia Telescope National Facility Mopra telescope's monitoring program. Observations were carried out several times a year between 2008 and 2012 and are continuing. The SiO spectra are from the v = 1, Jmore » = 1-0 (43.122 GHz; hereafter J10) and the v = 1, J = 2-1 (86.2434 GHz; hereafter J21) transitions. For 41 of the 47 LPVs we observed both transitions nearly simultaneously in 457 observations. We have determined and compared the velocity centroids (VCs) and velocity ranges (VRs) of emission suffixed as above (10 and 21) for the two transitions: VC10, VC21, VR10, and VR21. The VCs of the two transitions are, on average, within 0.13 km s{sup -1} of each other but are sometimes separated by a few km s{sup -1}. The VC10s are, on average, slightly more positive than the VC21s. The values of the VCs in the two transitions have been compared to justify using both of these transitions to extract binary star orbital parameters. The arithmetic mean VR10 derived from 635 observations of 47 sources is 6.4 km s{sup -1} with a standard deviation of 3.4 km s{sup -1}, while the mean VR21 derived from 485 observations of 41 sources is 4.2 km s{sup -1} with a standard deviation of 2.8 km s{sup -1}. The number of occurrences of VR10 and VR21 versus VR have different distributions. The differences in the VRs indicate that the J21 and J10 emissions arise from dynamically different regions of the circumstellar environment.« less
Everett Jones, Sherry; Brener, Nancy D.; McManus, Tim
2003-01-01
Objectives. We examined the extent to which schools in the United States have health-promoting policies, programs, and facilities. Methods. We analyzed data from the School Health Policies and Programs Study 2000. Results. We found that public schools (vs private and Catholic schools), urban schools (vs rural and suburban schools), and schools with larger enrollments (vs smaller schools) had more health-promoting policies, programs, and facilities in place. On average, middle schools had 11.0 and middle/junior and high schools had 10.4 out of a possible 18 policies, programs, and facilities. Conclusions. Although some schools had many healthy physical environment features, room for improvement exists. Resources are available to help schools improve their health-promoting policies, programs, and facilities. PMID:12948982
Improving Literacy Achievement for English Learners in Transitional Bilingual Programs.
ERIC Educational Resources Information Center
Saunders, William M.
1999-01-01
Reports on the development and evaluation of a transitional bilingual program for grades 2 through 5. Evaluation results based on achievement of 42 students and 42 comparisons show that the program is more effective than the transition program students typically receive. Discusses implications for education of English learners. (SLD)
ERIC Educational Resources Information Center
Spoonemore, L. Joe
1999-01-01
Discusses facility managers' preparedness for dealing with the Y2K bug and ways to systematically assess and avoid its impact. Tips for reducing computerized system failure as facility managers make their transition into the next century conclude the article. (GR)
Transition Analysis for the Mars Science Laboratory Entry Vehicle
NASA Technical Reports Server (NTRS)
Chang, Chau-Lyan; Choudhari, Meelan M.; Hollis, Brian R.; Li, Fei
2009-01-01
Viscous Laminar-turbulent transition plays an important role in the design of the Mars Science Laboratory (MSL) entry vehicle. The lift-to-drag ratio required for the precision landing trajectory will be achieved via an angle of attack equal to 16 degrees. At this relatively high angle of attack, the boundary layer flow near the leeward meridian is expected to transition early in the trajectory, resulting in substantially increased heating loads. This paper presents stability calculations and transition correlations for a series of wind tunnel models of the MSL vehicle. Experimentally measured transition onset locations are used to correlate with the N-factor calculations for various wind tunnel conditions. Due to relatively low post-shock Mach numbers near the edge of the boundary layer, the dominant instability waves are found to be of the first mode type. The N-factor values correlating with measured transition onset at selected test points from the Mach 6 conventional facility experiments fall between 3.5 and 4.5 and apparently vary linearly with the wind tunnel unit Reynolds number, indicating strong receptivity effect. The small transition N value is consistent with previous correlations for second-mode dominant transition in the same wind tunnel facility. Stability calculations for stationary and traveling crossflow instability waves in selected configurations indicate that an N value of 4 and 6, respectively, correlates reasonably well with transition onset discerned from one experimentally measured thermographic image.
Steady State Advanced Tokamak (SSAT): The mission and the machine
NASA Astrophysics Data System (ADS)
Thomassen, K.; Goldston, R.; Nevins, B.; Neilson, H.; Shannon, T.; Montgomery, B.
1992-03-01
Extending the tokamak concept to the steady state regime and pursuing advances in tokamak physics are important and complementary steps for the magnetic fusion energy program. The required transition away from inductive current drive will provide exciting opportunities for advances in tokamak physics, as well as important impetus to drive advances in fusion technology. Recognizing this, the Fusion Policy Advisory Committee and the U.S. National Energy Strategy identified the development of steady state tokamak physics and technology, and improvements in the tokamak concept, as vital elements in the magnetic fusion energy development plan. Both called for the construction of a steady state tokamak facility to address these plan elements. Advances in physics that produce better confinement and higher pressure limits are required for a similar unit size reactor. Regimes with largely self-driven plasma current are required to permit a steady-state tokamak reactor with acceptable recirculating power. Reliable techniques of disruption control will be needed to achieve the availability goals of an economic reactor. Thus the central role of this new tokamak facility is to point the way to a more attractive demonstration reactor (DEMO) than the present data base would support. To meet the challenges, we propose a new 'Steady State Advanced Tokamak' (SSAT) facility that would develop and demonstrate optimized steady state tokamak operating mode. While other tokamaks in the world program employ superconducting toroidal field coils, SSAT would be the first major tokamak to operate with a fully superconducting coil set in the elongated, divertor geometry planned for ITER and DEMO.
Flux-Level Transit Injection Experiments with NASA Pleiades Supercomputer
NASA Astrophysics Data System (ADS)
Li, Jie; Burke, Christopher J.; Catanzarite, Joseph; Seader, Shawn; Haas, Michael R.; Batalha, Natalie; Henze, Christopher; Christiansen, Jessie; Kepler Project, NASA Advanced Supercomputing Division
2016-06-01
Flux-Level Transit Injection (FLTI) experiments are executed with NASA's Pleiades supercomputer for the Kepler Mission. The latest release (9.3, January 2016) of the Kepler Science Operations Center Pipeline is used in the FLTI experiments. Their purpose is to validate the Analytic Completeness Model (ACM), which can be computed for all Kepler target stars, thereby enabling exoplanet occurrence rate studies. Pleiades, a facility of NASA's Advanced Supercomputing Division, is one of the world's most powerful supercomputers and represents NASA's state-of-the-art technology. We discuss the details of implementing the FLTI experiments on the Pleiades supercomputer. For example, taking into account that ~16 injections are generated by one core of the Pleiades processors in an hour, the “shallow” FLTI experiment, in which ~2000 injections are required per target star, can be done for 16% of all Kepler target stars in about 200 hours. Stripping down the transit search to bare bones, i.e. only searching adjacent high/low periods at high/low pulse durations, makes the computationally intensive FLTI experiments affordable. The design of the FLTI experiments and the analysis of the resulting data are presented in “Validating an Analytic Completeness Model for Kepler Target Stars Based on Flux-level Transit Injection Experiments” by Catanzarite et al. (#2494058).Kepler was selected as the 10th mission of the Discovery Program. Funding for the Kepler Mission has been provided by the NASA Science Mission Directorate.
Identifying and Funding the Greatest Needs in School Facilities
ERIC Educational Resources Information Center
Gorrell, Bob; Salamone, Frank
2012-01-01
How should public school facilities programs allocate limited resources to school facilities needs fairly, cost-effectively, and efficiently while taking into account facility condition, educational adequacy, and other priorities? New Mexico has developed a solution that overcomes key challenges that are common to school facilities programs across…
Bus Rapid Transit Demonstration Program
DOT National Transportation Integrated Search
1998-12-31
This report was prepared by the Federal Transit Administration's (FTA) Office of Research, Demonstration and Innovation. It describes the FTA's Bus Rapid Transit Demonstration Program, designed to provide funding and support to transit agencies engag...
Transit Station Renovation: A Case Study of Planning and Design Procedures
DOT National Transportation Integrated Search
1979-06-01
The general techniques and procedures for planning and evaluating transit : interface facilities are applied comprehensively to the problem of station : renovation. The 69th Street Terminal in Philadelphia is evaluated in terms of : its performance i...
Review on Selection and Suitability of Rail Transit Station Design Pertaining to Public Safety
NASA Astrophysics Data System (ADS)
Akabal, Farah Mohd; Masirin, Mohd Idrus Haji Mohd; Abidin Akasah, Zainal; Rohani, Munzilah Md
2017-08-01
Railway has emerged as a fast, convenient, safe, clean, and low-cost alternative to air and road transportation. Many countries have invested in rail transportation. In America, Europe and Asia, large investments are planned for rail transportation. This is because congestion problems can be reduced with the introduction of rail transportation. Rail transportation involves several components which are important to ensure the smooth and safe delivery of services such as locomotives, rail stations and railway tracks. Rail transit stations are places where trains stop to pick-up and drop-off passengers. Stations are vital for many to enable them to engage in work and social commitments. This paper focuses only on the rail transit station as it is one of the important components in rail transportation. It is also considered as a key public meeting place and space for interactions in a community. The role of rail transit station and the requirements of a good rail transit station are also described in this paper. Steps in selecting the location of rail transit station include the function and facilities in rail transit station are discussed with reference to best practices and handbooks. Selection of the appropriate rail transit station locations may help users indirectly. In addition, this paper will also elucidate on the design considerations for an efficient and effective rail transit station. Design selections for the rail transit station must be balanced between aesthetic value and functional efficiency. The right design selection may help conserve energy, assure and facilitate consumers even thought a rail transit station plays a smaller role in attracting consumers compared to a shopping complex or a residential building. This will contribute towards better and greener building for a green transportation facility. Thus, with this paper it is expected to assist the relevant authority to identify important elements in the selection and determination of suitable rail transit station design for the future. It is also important to ensure the design is appropriate from the selection and suitability perspective as design and operation will assist to facilitate the success of the national rail network and encourage the public to use rail transit system. A conducive and neatly design railway station will not only add to the passenger experience but also, as a supporting facility to the economic, social and environmental benefits of the rail industry.
Interactive Game for Teaching Laser Amplification Used at the National Ignition Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, E
The purpose of this project was to create an interactive game to expose high school students to concepts in laser amplification by demonstrating the National Ignition Facility's main amplifier at Lawrence Livermore National Laboratory. To succeed, the game had to be able to communicate effectively the basic concepts of laser amplification as accurately as possible and to be capable of exposing as many students as possible. Since concepts need to be communicated in a way that students understand, the Science Content Standards for California Public Schools were used to make assumptions about high school students knowledge of light. Effectively communicatingmore » a new concept necessitates the omission on terminology and symbolism. Therefore, creating a powerful experience was ideal for communicating this material. Various methods of reinforcing this experience ranging from color choice to abstractions kept the student focused on the game to maximize concept retention. The program was created in Java to allow the creation of a Java Applet that can be embedded onto a webpage, which is a perfect medium for mass exposure. Because a game requires interaction, the game animations had to be easily manipulated to enable the program to respond to user input. Image sprites, as opposed to image folders, were used in these animations to minimize the number of Hypertext Transfer Protocol connections, and thus, significantly reduce the transfer time of necessary animation files. These image sprites were loaded and cropped into a list of animation frames. Since the caching of large transition animations caused the Java Virtual Machine to run out of memory, large animations were implemented as animated Graphics Interchange Format images since transitions require no interaction, and thus, no frame manipulation was needed. This reduced the animation's memory footprint. The first version of this game was completed during this project. Future work for the project could include the creation of focus groups to assess the effectiveness of communicating material through an interactive game. Numerical assessments programmed into the game could also be used to collect statistics that reflect difficulty or level of frustration that students experience.« less
1987-09-01
priority based on the r sul-s of the rank order analysis of the combined USAF/COE Sa a jrouo n1 or :v.e USA’ dana qrouo. The COE data group sablisn...between the Resident Engineer and the DEEC is needed. O&M Manuals. The USAF conmnents anI concerns a bo,1t -ie &M M4ani’L3 4ere: 1. Som etnes g-ttinj the...teR-2sidJent Engineer- .ini tn- Chieff oDf Contract Man age-!n-enit ( DEEC is needed. Along the same line , onie COE comnmen t statedI that thne
Hakizimana, Ali; Ahmed, Iftikhar; Russell, Rachel; Wright, Mark; Afzal, Nadeem A
2017-07-07
In this article we discuss the challenges of delivering a high quality Transition care. A good understanding of the adolescent needs with good communication between Transition care physicians and the patient is essential for good continuity of care. Despite availability of several guidelines, one model doesn't fit all and any transition service development should be determined by the local need and available healthcare facilities.
Clean Air Markets - Facility Attributes and Contacts Query Wizard
The Facility Attributes and Contacts Query Wizard is part of a suite of Clean Air Markets-related tools that are accessible at http://camddataandmaps.epa.gov/gdm/index.cfm. The Facility Attributes and Contact module gives the user access to current and historical facility, owner, and representative data using custom queries, via the Facility Attributes Query Wizard, or Quick Reports. In addition, data regarding EPA, State, and local agency staff are also available. The Query Wizard can be used to search for data about a facility or facilities by identifying characteristics such as associated programs, owners, representatives, locations, and unit characteristics, facility inventories, and classifications.EPA's Clean Air Markets Division (CAMD) includes several market-based regulatory programs designed to improve air quality and ecosystems. The most well-known of these programs are EPA's Acid Rain Program and the NOx Programs, which reduce emissions of sulfur dioxide (SO2) and nitrogen oxides (NOx)-compounds that adversely affect air quality, the environment, and public health. CAMD also plays an integral role in the development and implementation of the Clean Air Interstate Rule (CAIR).
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
...] Medicare Program; Solicitation for Proposals for the Medicare Community-Based Care Transitions Program... interested parties of an opportunity to apply to participate in the Medicare Community-based Care Transitions Program, which was authorized by section 3026 of the Affordable Care Act. DATES: Proposals will be...
Volunteer Evaluations of the Transitions Program for Young Adults with Autism Spectrum Disorder
ERIC Educational Resources Information Center
Evans, Lacey
2018-01-01
This study examined the effects of participation of peer volunteers in the Transitions Program for young adults with Autism Spectrum Disorder (ASD), a program that facilitates social skills and social interactions. Participants in this study were peer volunteers in the Transitions Program. Each peer volunteer completed a questionnaire, following…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... Program Participants Transitioning Out of the Rural Health Care Pilot Program in Funding Year 2012 AGENCY..., the Wireline Competition Bureau seeks comment on whether to fund Rural Health Care Pilot Program... transition them into the permanent Rural Health Care support mechanism (RHC support mechanism). DATES...
Youth and administrator perspectives on transition in Kentucky's state agency schools.
Marshall, Amy; Powell, Norman; Pierce, Doris; Nolan, Ronnie; Fehringer, Elaine
2012-01-01
Students, a large percentage with disabilities, are at high risk for poor post-secondary outcomes in state agency education programs. This mixed-methods study describes the understandings of student transitions in state agency education programs from the perspectives of youth and administrators. Results indicated that: transition is more narrowly defined within alternative education programs; key strengths of transition practice are present in nontraditional schools; and the coordination barriers within this fluid inter-agency transition system are most apparent in students' frequent inter-setting transitions between nontraditional and home schools.
Multiple ART Programs Create a Dilemma for Providers to Monitor ARV Adherence in Uganda.
Obua, Celestino; Gusdal, Annelie; Waako, Paul; Chalker, John C; Tomson, Goran; Wahlström, Rolf; Team, The Inrud-Iaa
2011-01-01
Increased availability and accessibility of antiretroviral therapy (ART) has improved the length and quality of life amongst people living with HIV/AIDS. This has changed the landscape for care from episodic to long-term care that requires more monitoring of adherence. This has led to increased demand on human resources, a major problem for most ART programs. This paper presents experiences and perspectives of providers in ART facilities, exploring the organizational factors affecting their capacity to monitor adherence to ARVs. From an earlier survey to test adherence indicators and rank facilities as good, medium or poor adherence performances, six facilities were randomly selected, two from each rank. Observations on facility set-up, provider-patient interactions and key informant interviews were carried out. The strengths, weaknesses, opportunities and threats identified by health workers as facilitators or barriers to their capacity to monitor adherence to ARVs were explored during group discussions. Findings show that the performance levels of the facilities were characterized by four different organizational ART programs operating in Uganda, with apparent lack of integration and coordination at the facilities. Of the six facilities studied, the two high adherence performing facilities were Non-Governmental Organization (NGO) programs, while facilities with dual organizational programs (Governmental/NGO) performed poorly. Working conditions, record keeping and the duality of programs underscored the providers' capacity to monitor adherence. Overall 70% of the observed provider-patient interactions were conducted in environments that ensured privacy of the patient. The mean performance for record keeping was 79% and 50% in the high and low performing facilities respectively. Providers often found it difficult to monitor adherence due to the conflicting demands from the different organizational ART programs. Organizational duality at facilities is a major factor in poor adherence monitoring. The different ART programs in Uganda need to be coordinated and integrated into a single well resourced program to improve ART services and adherence monitoring. The focus on long-term care of patients on ART requires that the limitations to providers' capacity for monitoring adherence become central during the planning and implementation of ART programs.
23 CFR 810.108 - Designation of existing facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
....108 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway... designate existing parking facilities (such as at shopping centers or other public or private locations) for...
26 CFR 1.7704-2 - Transition provisions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... residential section, which includes suites of rooms, dining facilities, lounges, and gamerooms; (B) An assisted-living section, which provides laundry and housekeeping services, health monitoring, and emergency care; and (C) A nursing section, which provides private and semiprivate rooms, dining facilities...
26 CFR 1.7704-2 - Transition provisions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... residential section, which includes suites of rooms, dining facilities, lounges, and gamerooms; (B) An assisted-living section, which provides laundry and housekeeping services, health monitoring, and emergency care; and (C) A nursing section, which provides private and semiprivate rooms, dining facilities...
19 CFR 201.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Program accessibility: Existing facilities. 201.150 Section 201.150 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION GENERAL RULES OF... Conducted by the U.S. International Trade Commission § 201.150 Program accessibility: Existing facilities...
19 CFR 201.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 19 Customs Duties 3 2012-04-01 2012-04-01 false Program accessibility: Existing facilities. 201.150 Section 201.150 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION GENERAL RULES OF... Conducted by the U.S. International Trade Commission § 201.150 Program accessibility: Existing facilities...
19 CFR 201.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 19 Customs Duties 3 2014-04-01 2014-04-01 false Program accessibility: Existing facilities. 201.150 Section 201.150 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION GENERAL RULES OF... Conducted by the U.S. International Trade Commission § 201.150 Program accessibility: Existing facilities...
19 CFR 201.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 19 Customs Duties 3 2013-04-01 2013-04-01 false Program accessibility: Existing facilities. 201.150 Section 201.150 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION GENERAL RULES OF... Conducted by the U.S. International Trade Commission § 201.150 Program accessibility: Existing facilities...
19 CFR 201.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 19 Customs Duties 3 2011-04-01 2011-04-01 false Program accessibility: Existing facilities. 201.150 Section 201.150 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION GENERAL RULES OF... Conducted by the U.S. International Trade Commission § 201.150 Program accessibility: Existing facilities...
5 CFR 1636.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... facilities. 1636.150 Section 1636.150 Administrative Personnel FEDERAL RETIREMENT THRIFT INVESTMENT BOARD... RETIREMENT THRIFT INVESTMENT BOARD § 1636.150 Program accessibility: Existing facilities. (a) General. The... fundamental alteration in the nature of a program or activity or in undue financial and administrative burdens...
45 CFR 2301.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program accessibility: Existing facilities. 2301.150 Section 2301.150 Public Welfare Regulations Relating to Public Welfare (Continued) ARCTIC RESEARCH... THE UNITED STATES ARCTIC RESEARCH COMMISSION § 2301.150 Program accessibility: Existing facilities. (a...
45 CFR 2301.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Program accessibility: Existing facilities. 2301.150 Section 2301.150 Public Welfare Regulations Relating to Public Welfare (Continued) ARCTIC RESEARCH... THE UNITED STATES ARCTIC RESEARCH COMMISSION § 2301.150 Program accessibility: Existing facilities. (a...
Berlin, Lisa J.; Dunning, Rebecca D.; Dodge, Kenneth A.
2010-01-01
This randomized trial tested the efficacy of an intensive, four-week summer program designed to enhance low-income children's transition to kindergarten (n's = 60 program children, 40 controls). Administered in four public schools, the program focused on social competence, pre-literacy and pre-numeracy skills, school routines, and parental involvement. Hierarchical linear modeling indicated that the program significantly improved teachers’ ratings of (a) the transition to the social aspect of kindergarten for girls (but not boys); and (b) the transition to kindergarten routines for the subgroup of children who had the same teacher for kindergarten as for the summer program. Findings are discussed in terms of practices and policies for supporting children's transition to school. PMID:21969767
Community Discharge of Nursing Home Residents: The Role of Facility Characteristics.
Holup, Amanda A; Gassoumis, Zachary D; Wilber, Kathleen H; Hyer, Kathryn
2016-04-01
Using a socio-ecological model, this study examines the influence of facility characteristics on the transition of nursing home residents to the community after a short stay (within 90 days of admission) or long stay (365 days of admission) across states with different long-term services and supports systems. Data were drawn from the Minimum Data Set, the federal Online Survey, Certification, and Reporting (OSCAR) database, the Area Health Resource File, and the LTCFocUs.org database for all free-standing, certified nursing homes in California (n = 1,127) and Florida (n = 657) from July 2007 to June 2008. Hierarchical generalized linear models were used to examine the impact of facility characteristics on the probability of transitioning to the community. Facility characteristics, including size, occupancy, ownership, average length of stay, proportion of Medicare and Medicaid residents, and the proportion of residents admitted from acute care facilities are associated with discharge but differed by state and whether the discharge occurred after a short or long stay. Short- and long-stay nursing home discharge to the community is affected by resident, facility, and sometimes market characteristics, with Medicaid consistently influencing discharge in both states. © Health Research and Educational Trust.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 810.200 Section 810.200 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE... rights-of-way for rail or other non-highway public mass transit facilities. ...
DOT National Transportation Integrated Search
1999-09-01
This booklet presents some of the successes of the community-sensitive transportation facility development process. Although a comprehensive process is described here, not every project involves the full range of steps. By applying the techniques out...
A statistical analysis of the relationship between land values and freestanding bus facilities.
DOT National Transportation Integrated Search
2010-02-01
Public transit professionals continue to seek methods that offer greater service opportunities, while : not materially increasing the costs of service provision. One strategy is to construct bus transit : centers which operate much like the airline h...
A tool for assessing the economic impact of spending on public transit : [summary].
DOT National Transportation Integrated Search
2013-01-01
Good public transit systems are important : community amenities because they increase : the mobility options for residents at all income : levels and abilities, they reduce congestion on : roadways and in parking facilities, and they help : to reduce...
Alhabbab, R.; Blair, P.; Elgueta, R.; Stolarczyk, E.; Marks, E.; Becker, P. D.; Ratnasothy, K.; Smyth, L.; Safinia, N.; Sharif-Paghaleh, E.; O’Connell, S.; Noelle, R. J.; Lord, G. M.; Howard, J. K.; Spencer, J.; Lechler, R. I.; Lombardi, G.
2015-01-01
B cells have been reported to promote graft rejection through alloantibody production. However, there is growing evidence that B cells can contribute to the maintenance of tolerance. Here, we used a mouse model of MHC-class I mismatched skin transplantation to investigate the contribution of B cells to graft survival. We demonstrate that adoptive transfer of B cells prolongs skin graft survival but only when the B cells were isolated from mice housed in low sterility “conventional” (CV) facilities and not from mice housed in pathogen free facilities (SPF). However, prolongation of skin graft survival was lost when B cells were isolated from IL-10 deficient mice housed in CV facilities. The suppressive function of B cells isolated from mice housed in CV facilities correlated with an anti-inflammatory environment and with the presence of a different gut microflora compared to mice maintained in SPF facilities. Treatment of mice in the CV facility with antibiotics abrogated the regulatory capacity of B cells. Finally, we identified transitional B cells isolated from CV facilities as possessing the regulatory function. These findings demonstrate that B cells, and in particular transitional B cells, can promote prolongation of graft survival, a function dependent on licensing by gut microflora. PMID:26109230
Evaluation guidelines for bus rapid transit demonstration projects
DOT National Transportation Integrated Search
2002-02-01
The Federal Transit Administration's (FTA) Bus Rapid Transit Demonstration Program is supporting demonstrations of Bus Rapid Transit (BRT) in selected cities across the United States. The US BRT Demonstration Program aims to adapt the principles of h...
Tsai, Jack; Rosenheck, Robert A; Kasprow, Wesley J; McGuire, James F
2012-10-01
This study examined whether homeless clients enrolled in transitional housing programs that required sobriety (SR) as an admission criterion have outcomes comparable to clients enrolled in programs that did not require sobriety (NSR) as an admission criterion. A total of 1062 military veterans in 40 transitional housing programs funded by the United States Department of Veterans Affairs were grouped based on whether they were in SR or NSR programs and followed over a one-year period after program discharge. Participants in SR and NSR programs were compared on their ratings of the social climate of the program, and housing and psychosocial outcomes. Participants in SR programs reported more days housed and better psychosocial outcomes than participants in NSR programs, although the differences were small and there were no differences in ratings of their social climate. Both participants in SR and NSR programs showed improvements on most outcomes after discharge from transitional housing. There were no significant differences in outcomes between participants actively abusing substances at program entry compared to those who were not. Requiring sobriety as an admission criterion in transitional housing made only a small difference in housing outcomes post-discharge. Further study is needed to determine whether requiring sobriety at admission in transitional housing is necessary for successful client outcomes. Published by Elsevier Ireland Ltd.
Music to the Ears: Orchestrating Successful Leadership Change
ERIC Educational Resources Information Center
Loy, Darcy
2011-01-01
In music, transition can be "a progression from one key to another in a piece of music." Michael Watkins, author of "The First 90 Days" states, "Transitions are periods of opportunity, a chance to start afresh and to make needed changes in an organization." For those who are in the facilities world, transition can often refer to a change of…
ERIC Educational Resources Information Center
Schwartz, Ann E.; McRoy, Ruth G.; Downs, A. Chris
2004-01-01
Most of the research literature on attachment and adolescent transitions has addressed youth in family settings. This article explores these issues with a sample of 25 pregnant and parenting teens living in a transitional shelter. Using case records and interview data as well as results of standardized measures of depression, self-esteem, child…
Two test level 4 bridge railing and transition systems for transverse timber deck bridges
Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Michael D. Fowler; Sheila R. Duwadi
2000-01-01
The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agricultureas Forest Service, and FHWA, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated timber decks. The bridge raging and transition systems were developed and crash...
Facilities Management: A Program for the 1980s.
ERIC Educational Resources Information Center
Kaiser, Harvey H.
1980-01-01
Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…
7 CFR 1493.260 - Facility payment guarantee.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to... fails to pay under the foreign bank letter of credit or related obligation. The exact amount of CCC's...
7 CFR 1493.260 - Facility payment guarantee.
Code of Federal Regulations, 2012 CFR
2012-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to... fails to pay under the foreign bank letter of credit or related obligation. The exact amount of CCC's...
7 CFR 1493.260 - Facility payment guarantee.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to... fails to pay under the foreign bank letter of credit or related obligation. The exact amount of CCC's...
Antimicrobial stewardship in long term care facilities: what is effective?
Nicolle, Lindsay E
2014-02-12
Intense antimicrobial use in long term care facilities promotes the emergence and persistence of antimicrobial resistant organisms and leads to adverse effects such as C. difficile colitis. Guidelines recommend development of antimicrobial stewardship programs for these facilities to promote optimal antimicrobial use. However, the effectiveness of these programs or the contribution of any specific program component is not known. For this review, publications describing evaluation of antimicrobial stewardship programs for long term care facilities were identified through a systematic literature search. Interventions included education, guidelines development, feedback to practitioners, and infectious disease consultation. The studies reviewed varied in types of facilities, interventions used, implementation, and evaluation. Comprehensive programs addressing all infections were reported to have improved antimicrobial use for at least some outcomes. Targeted programs for treatment of pneumonia were minimally effective, and only for indicators of uncertain relevance for stewardship. Programs focusing on specific aspects of treatment of urinary infection - limiting treatment of asymptomatic bacteriuria or prophylaxis of urinary infection - were reported to be effective. There were no reports of cost-effectiveness, and the sustainability of most of the programs is unclear. There is a need for further evaluation to characterize effective antimicrobial stewardship for long term care facilities.
Kanters, Michael A; Bocarro, Jason N; Filardo, Mary; Edwards, Michael B; McKenzie, Thomas L; Floyd, Myron F
2014-05-01
Partnerships between school districts and community-based organizations to share school facilities during afterschool hours can be an effective strategy for increasing physical activity. However, the perceived cost of shared use has been noted as an important reason for restricting community access to schools. This study examined shared use of middle school facilities, the amount and type of afterschool physical activity programs provided at middle schools together with the costs of operating the facilities. Afterschool programs were assessed for frequency, duration, and type of structured physical activity programs provided and the number of boys and girls in each program. School operating costs were used to calculate a cost per student and cost per building square foot measure. Data were collected at all 30 middle schools in a large school district over 12 months in 2010-2011. Policies that permitted more use of school facilities for community-sponsored programs increased participation in afterschool programs without a significant increase in operating expenses. These results suggest partnerships between schools and other community agencies to share facilities and create new opportunities for afterschool physical activity programs are a promising health promotion strategy. © 2014, American School Health Association.
Hotez, Emily; Shane-Simpson, Christina; Obeid, Rita; DeNigris, Danielle; Siller, Michael; Costikas, Corinna; Pickens, Jonathan; Massa, Anthony; Giannola, Michael; D'Onofrio, Joanne; Gillespie-Lynch, Kristen
2018-01-01
Students with Autism Spectrum Disorder (ASD) face unique challenges transitioning from high school to college and receive insufficient support to help them navigate this transition. Through a participatory collaboration with incoming and current autistic college students, we developed, implemented, and evaluated two intensive week-long summer programs to help autistic students transition into and succeed in college. This process included: (1) developing an initial summer transition program curriculum guided by recommendations from autistic college students in our ongoing mentorship program, (2) conducting an initial feasibility assessment of the curriculum [Summer Transition Program 1 (STP1)], (3) revising our initial curriculum, guided by feedback from autistic students, to develop a curriculum manual, and (4) pilot-testing the manualized curriculum through a quasi-experimental pre-test/post-test assessment of a second summer program [Summer Transition Program 2 (STP2)]. In STP2, two autistic college students assumed a leadership role and acted as "mentors" and ten incoming and current autistic college students participated in the program as "mentees." Results from the STP2 pilot-test suggested benefits of participatory transition programming for fostering self-advocacy and social skills among mentees. Autistic and non-autistic mentors (but not mentees) described practicing advanced forms of self-advocacy, specifically leadership, through their mentorship roles. Autistic and non-autistic mentors also described shared (e.g., empathy) and unique (an intuitive understanding of autism vs. an intuitive understanding of social interaction) skills that they contributed to the program. This research provides preliminary support for the feasibility and utility of a participatory approach in which autistic college students are integral to the development and implementation of programming to help less experienced autistic students develop the self-advocacy skills they will need to succeed in college.
Hotez, Emily; Shane-Simpson, Christina; Obeid, Rita; DeNigris, Danielle; Siller, Michael; Costikas, Corinna; Pickens, Jonathan; Massa, Anthony; Giannola, Michael; D'Onofrio, Joanne; Gillespie-Lynch, Kristen
2018-01-01
Students with Autism Spectrum Disorder (ASD) face unique challenges transitioning from high school to college and receive insufficient support to help them navigate this transition. Through a participatory collaboration with incoming and current autistic college students, we developed, implemented, and evaluated two intensive week-long summer programs to help autistic students transition into and succeed in college. This process included: (1) developing an initial summer transition program curriculum guided by recommendations from autistic college students in our ongoing mentorship program, (2) conducting an initial feasibility assessment of the curriculum [Summer Transition Program 1 (STP1)], (3) revising our initial curriculum, guided by feedback from autistic students, to develop a curriculum manual, and (4) pilot-testing the manualized curriculum through a quasi-experimental pre-test/post-test assessment of a second summer program [Summer Transition Program 2 (STP2)]. In STP2, two autistic college students assumed a leadership role and acted as “mentors” and ten incoming and current autistic college students participated in the program as “mentees.” Results from the STP2 pilot-test suggested benefits of participatory transition programming for fostering self-advocacy and social skills among mentees. Autistic and non-autistic mentors (but not mentees) described practicing advanced forms of self-advocacy, specifically leadership, through their mentorship roles. Autistic and non-autistic mentors also described shared (e.g., empathy) and unique (an intuitive understanding of autism vs. an intuitive understanding of social interaction) skills that they contributed to the program. This research provides preliminary support for the feasibility and utility of a participatory approach in which autistic college students are integral to the development and implementation of programming to help less experienced autistic students develop the self-advocacy skills they will need to succeed in college. PMID:29487547
ALCF Data Science Program: Productive Data-centric Supercomputing
NASA Astrophysics Data System (ADS)
Romero, Nichols; Vishwanath, Venkatram
The ALCF Data Science Program (ADSP) is targeted at big data science problems that require leadership computing resources. The goal of the program is to explore and improve a variety of computational methods that will enable data-driven discoveries across all scientific disciplines. The projects will focus on data science techniques covering a wide area of discovery including but not limited to uncertainty quantification, statistics, machine learning, deep learning, databases, pattern recognition, image processing, graph analytics, data mining, real-time data analysis, and complex and interactive workflows. Project teams will be among the first to access Theta, ALCFs forthcoming 8.5 petaflops Intel/Cray system. The program will transition to the 200 petaflop/s Aurora supercomputing system when it becomes available. In 2016, four projects have been selected to kick off the ADSP. The selected projects span experimental and computational sciences and range from modeling the brain to discovering new materials for solar-powered windows to simulating collision events at the Large Hadron Collider (LHC). The program will have a regular call for proposals with the next call expected in Spring 2017.http://www.alcf.anl.gov/alcf-data-science-program This research used resources of the ALCF, which is a DOE Office of Science User Facility supported under Contract DE-AC02-06CH11357.
Tools for Transition in Early Childhood: A Step-by-Step Guide for Agencies, Teachers, and Families
ERIC Educational Resources Information Center
Rous, Beth S., Ed.D; Hallam, Rena A.
2006-01-01
For young children with and without disabilities, positive outcomes depend on smooth, effective transitions between and within early intervention programs, preschool programs, and public school programs. Now there is a how-to guide that helps professionals across programs work together to make these transitions happen. Coauthored by top expert…
Boundary-layer instability & transition on a flared cone in a Mach 6 quiet wind tunnel
NASA Astrophysics Data System (ADS)
Hofferth, Jerrod; Saric, William
2011-11-01
Measurements of boundary-layer transition location and instability growth on a sharp-tipped 5°-half-angle flared cone were conducted in a low-disturbance Mach 6 wind tunnel at a freestream unit Reynolds number of 10 × 106/m. Under quiet flow at these conditions, the boundary layer becomes transitional near the base of the cone, where significant second-mode instability growth is evident. Transition location is determined using an array of embedded thermocouples, and instability development is observed in mean and fluctuating mass flux data using hotwire anemometry. The present work seeks to reproduce and build upon previous experiments which used the same test article and similar diagnostics in the facility's former installation at NASA Langley. Together with comprehensive measurements of the freestream disturbance environment, these baseline cone data characterize the facility's performance relative to that in its previous installation. In addition, the current campaign establishes experimental readiness for future research, which will study the effects of periodic surface roughness and controlled-input disturbances. AFOSR/NASA National Center for Hypersonic Research in Laminar-Turbulent Transition; Grant FA9550-09-1-0341.
ASCR/HEP Exascale Requirements Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Habib, Salman; Roser, Robert; Gerber, Richard
This draft report summarizes and details the findings, results, and recommendations derived from the ASCR/HEP Exascale Requirements Review meeting held in June, 2015. The main conclusions are as follows. 1) Larger, more capable computing and data facilities are needed to support HEP science goals in all three frontiers: Energy, Intensity, and Cosmic. The expected scale of the demand at the 2025 timescale is at least two orders of magnitude -- and in some cases greater -- than that available currently. 2) The growth rate of data produced by simulations is overwhelming the current ability, of both facilities and researchers, tomore » store and analyze it. Additional resources and new techniques for data analysis are urgently needed. 3) Data rates and volumes from HEP experimental facilities are also straining the ability to store and analyze large and complex data volumes. Appropriately configured leadership-class facilities can play a transformational role in enabling scientific discovery from these datasets. 4) A close integration of HPC simulation and data analysis will aid greatly in interpreting results from HEP experiments. Such an integration will minimize data movement and facilitate interdependent workflows. 5) Long-range planning between HEP and ASCR will be required to meet HEP's research needs. To best use ASCR HPC resources the experimental HEP program needs a) an established long-term plan for access to ASCR computational and data resources, b) an ability to map workflows onto HPC resources, c) the ability for ASCR facilities to accommodate workflows run by collaborations that can have thousands of individual members, d) to transition codes to the next-generation HPC platforms that will be available at ASCR facilities, e) to build up and train a workforce capable of developing and using simulations and analysis to support HEP scientific research on next-generation systems.« less
ASCR/HEP Exascale Requirements Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Habib, Salman; et al.
2016-03-30
This draft report summarizes and details the findings, results, and recommendations derived from the ASCR/HEP Exascale Requirements Review meeting held in June, 2015. The main conclusions are as follows. 1) Larger, more capable computing and data facilities are needed to support HEP science goals in all three frontiers: Energy, Intensity, and Cosmic. The expected scale of the demand at the 2025 timescale is at least two orders of magnitude -- and in some cases greater -- than that available currently. 2) The growth rate of data produced by simulations is overwhelming the current ability, of both facilities and researchers, tomore » store and analyze it. Additional resources and new techniques for data analysis are urgently needed. 3) Data rates and volumes from HEP experimental facilities are also straining the ability to store and analyze large and complex data volumes. Appropriately configured leadership-class facilities can play a transformational role in enabling scientific discovery from these datasets. 4) A close integration of HPC simulation and data analysis will aid greatly in interpreting results from HEP experiments. Such an integration will minimize data movement and facilitate interdependent workflows. 5) Long-range planning between HEP and ASCR will be required to meet HEP's research needs. To best use ASCR HPC resources the experimental HEP program needs a) an established long-term plan for access to ASCR computational and data resources, b) an ability to map workflows onto HPC resources, c) the ability for ASCR facilities to accommodate workflows run by collaborations that can have thousands of individual members, d) to transition codes to the next-generation HPC platforms that will be available at ASCR facilities, e) to build up and train a workforce capable of developing and using simulations and analysis to support HEP scientific research on next-generation systems.« less
ERIC Educational Resources Information Center
Nixon, Charles W.
1998-01-01
Examines renovation issues involving 30- and 40-year-old school facilities. Explores ways a school district can renovate old buildings to first-class cost-effective facilities while avoiding excessive transition costs. Discussions include installation of new technology and the resulting wiring demands, and developing more energy-efficient heating…
COMPENSATORY EDUCATION PROGRAM. NEWSLETTER.
ERIC Educational Resources Information Center
Fresno City Unified School District, CA.
TWO NEWSLETTERS FROM THE COMPENSATORY EDUCATION PROGRAM IN FRESNO INCLUDED PLANS FOR THE PLANNING GRANT PROGRAM, THE BASIC PROGRAM, AND THE INTENSIVE PROGRAM. THE BASIC PROGRAM SHOULD REDUCE PUPIL-TEACHER RATIO, PROVIDE PRESCHOOL PROJECTS THROUGH THE USE OF EITHER SCHOOL FACILITIES OR PRIVATE FACILITIES, PROVIDE REMEDIAL AND CORRECTIVE PROGRAMS IN…
Preschool Facilities: Are States Providing Adequate Guidance?
ERIC Educational Resources Information Center
Lea, Dennis R.; Polster, Patty Poppe
2010-01-01
The preschool facility is a critical element of an effective preschool program. The recent economic downturn in the United States makes it difficult for states and individual school districts to consider developing new preschool programs or enhancing current programs or facilities. Yet many Americans still agree that public investment in preschool…
49 CFR 37.61 - Public transportation programs and activities in existing facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Public transportation programs and activities in... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.61 Public transportation programs and activities in existing facilities. (a) A public entity shall operate a designated...
Title I, Part B, Institutionalized Facilities Program, Summer 1982. Annual Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.
This 1982 summer Title I, Part B, Institutionalized Facilities Program provided supplementary career instruction to 188 students residing in facilities for neglected and delinquent children and youth. This report briefly describes the program, providing information on methodology, physical setting, equipment, and supplies; population and class…
7 CFR 3405.9 - Use of funds for facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE HIGHER EDUCATION CHALLENGE GRANTS PROGRAM Program Description § 3405.9 Use of funds for facilities. Under the Higher Education Challenge Grants Program, the use... 7 Agriculture 15 2010-01-01 2010-01-01 false Use of funds for facilities. 3405.9 Section 3405.9...
Code of Federal Regulations, 2010 CFR
2010-10-01
... facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation... facilities that receive trade-in vehicles under the CARS program. (a) The disposal facility must: (1) Not... or shredded, report the vehicle to NMVTIS as crushed or shredded. (b) The disposal facility may not...
2015-11-01
more detail. Table 1: Overview of DARPA Programs Selected for GAO Case Study Analyses Program name Program description Advanced Wireless Networks ...Selected DARPA Programs Program name According to DARPA portfolio-level database According to GAO analysis Advanced Wireless Networks for the Soldier...with potential transition partners Achievement of clearly defined technical goals Successful transition Advanced Wireless Networks for Soldier
DOT National Transportation Integrated Search
2015-06-01
Researchers conducted a survey in four metropolitan Chicago neighborhoods served by commuter rail to explore how residents travel preferences might change with the potential addition of (1) an automated community transit (shuttle) service to and f...
Administrator Perceptions of Transition Programs in International Secondary Schools
ERIC Educational Resources Information Center
Bates, Jessica
2013-01-01
This study investigates the extent to which transition programs are offered to students at international secondary schools. Components of professional development, orientation and departure programs, and transition support teams were examined. Participants included school administrators at 11 international schools across five continents. Findings…
Broom, Kevin D.; Counte, Michael A.
2015-01-01
Recent US legislation is attempting to transition inpatient Medicare payments to a value-based purchasing (VBP) program. The VBP program is a pay-for-performance (P4P) system that incentivizes hospitals to improve patient satisfaction, health outcomes, and adherence to clinical protocols while simultaneously holding down costs. Our study evaluates (1) the impact of financial performance on the VBP adjustments and (2) whether there is a correlation between the VBP adjustment and the financial performance of Missouri hospitals that opted into the program. While upward and downward adjustments to the inpatient base rate may be related to hospital financial performance, prior financial performance may also be related to the adjustments. Financial health may allow facilities to invest and position the hospital for favorable future P4P adjustments. The results of our analysis indicate the VBP adjustment to the inpatient base rate is very small (±0.18%), clustered around zero, and is not correlated with financial performance. We also find that financial performance and improvement in the years prior to the adjustment are not related to the VBP adjustment or its respective components. This suggests that CMS is avoiding penalizing less profitable facilities, but the adjustment is also so small and tightly clustered around zero that it is failing to provide an adequate incentive to hospitals. The costs of improving patient satisfaction, clinical process adherence, health care outcomes, and efficiency above that of peers coupled with the growing number of metrics being used to calculate the VBP adjustments call into question the financial incentives of the hospital VBP program. PMID:28462265
Heery, Emily; Sheehan, Aisling M; While, Alison E; Coyne, Imelda
2015-01-01
This review synthesizes the empirical literature on outcomes and experiences of transfer and transition from pediatric to adult care for young people with congenital heart disease. A systematic review of papers published between January 2001 and May 2013 that examined outcomes or experiences of transfer and transition among young people with congenital heart disease was conducted. Data were extracted by two independent reviewers with the outcomes data combined using narrative synthesis and the experiences data integrated using thematic synthesis. Thirteen papers were included in the review: six reported outcomes following transfer, six reported experiences of transfer and transition, and one reported both outcomes and experiences. The review data indicate that high proportions of young people were lost to follow-up or experienced long gaps in care after leaving pediatric cardiology. Factors that protected against loss to follow-up or lapse in care included: beliefs that specialized adult care was necessary; poorer health status; attendance at pediatric appointments without parents; and pediatric referral to an adult congenital heart disease center. Data on experiences highlighted that many young people were unconcerned about transition, but lacked knowledge about their condition and were insufficiently prepared for transfer. In terms of adult services, many young people desired continuity in the quality of care, youth-oriented facilities, a personalized approach, and for their parents to remain involved in their care, but in a secondary, supportive capacity. In conclusion, the high proportions of young people lost to follow-up highlight the need for formal transition programs, which ensure a planned and coordinated transfer. Patients with congenital heart disease need education throughout adolescence about the implications of their condition, the differences between pediatric and adult services, and self-care management. © 2015 Wiley Periodicals, Inc.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.
This report describes and evaluates high school programs funded under Chapter 1, Part B, of the Education Consolidation and Improvement Act (ECIA) and administered by the Institutionalized Facilities Program of the New York City Public Schools in 1989-90. The program is designed to address the educational needs of students in facilities for…
Managing high-risk patients: the Mass General care management programme
Kodner, Dennis L.
2015-01-01
The Massachusetts General Care Management Program (Mass General CMP or CMP) was designed as a federally supported demonstration to test the impact of intensive, practice-based care management on high-cost Medicare fee-for-service (FFS) beneficiaries—primarily older persons—with multiple hospitalisations and multiple chronic conditions. The Massachusetts General Care Management Program operated over a 6-year period in two phases (3 years each). It started during the first phase at Massachusetts General Hospital, a major academic medical centre in Boston, Massachusetts in collaboration with Massachusetts General Physicians Organisation. During the second phase, the programme expanded to two more affiliated sites in and around the Boston area, including a community hospital, as well as incorporated several modifications primarily focused on the management of transitions to post-acute care in skilled nursing facilities. At the close of the demonstration in July 2012, Mass General Massachusetts General Care Management Program became a component of a new Pioneer accountable care organisation (ACO). The Massachusetts General Care Management Program is focused on individuals meeting defined eligibility criteria who are offered care that is integrated by a case manager embedded in a primary care practice. The demonstration project showed substantial cost savings compared to fee-for-service patients served in the traditional Medicare system but no impact on hospital readmissions. The Massachusetts General Care Management Program does not rest upon a “whole systems” approach to integrated care. It is an excellent example of how an innovative care co-ordination programme can be implemented in an existing health-care organisation without making fundamental changes in its underlying structure or the way in which direct patient care services are paid for. The accountable care organisation version of the Massachusetts General Care Management Program includes the staffing structure, standards of practice, collaborative approach to care transitions and information technology tools that were used in the original demonstration project. PMID:26417211
EPA FRS Facilities Combined File CSV Download for the Marshall Islands
The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.
EPA FRS Facilities Single File CSV Download for the Marshall Islands
The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.
Urban Telemedicine: The Applicability of Teleburns in the Rehabilitative Phase.
Liu, Yuk Ming; Mathews, Katie; Vardanian, Andrew; Bozkurt, Taylan; Schneider, Jeffrey C; Hefner, Jaye; Schulz, John T; Fagan, Shawn P; Goverman, Jeremy
Telemedicine has been successfully used in many areas of medicine, including triage and evaluation of the acute burn patient. The utility of telemedicine during the rehabilitative phase of burn care has yet to be evaluated; therefore, we expanded our telemedicine program to link our burn center with a rehabilitation facility. The goal of this project was to demonstrate cost-effective improvements in the transition and quality of care. A retrospective review was performed on all patients enrolled in our telemedicine/rehabilitation program between March 2013 and March 2014. Data collected included total number of encounters, visits, type of visit, physician time, and readmissions. Transportation costs were based on local ambulance rates between the two facilities. The impact of telemedicine was evaluated with respect to the time saved for the physician, burn center, and burn clinic, as well as rehabilitative days saved. A patient satisfaction survey was also administered. A total of 29 patients participated in 73 virtual visits through the telemedicine project. Virtual visits included new consults, preoperative evaluations, and postoperative follow-ups. A total of 146 ambulance transports were averted during the study period, totaling $101,110. Virtual visits saved 6.8 outpatient burn clinic days, or 73 clinic appointments of 30-min duration. The ability to perform more outpatient surgery resulted in 80 inpatient bed days saved at the burn hospital. The rehabilitation hospital saved an average of 2 to 3 patient days secondary to unnecessary travel. Satisfaction surveys demonstrated patient satisfaction with the encounters, primarily related to time saved. The decrease in travel time for the patient from the rehabilitation hospital to outpatient burn clinic improved adherence to the rehabilitation care plan and resulted in increased throughput at the rehabilitation facility. Videoconferencing between a burn center and rehabilitation hospital streamlined patient care and reduced health care costs, while maintaining quality of care and patient satisfaction. This program has improved inpatient burn rehabilitation by maximizing time spent in therapy and avoiding unnecessary patient travel to offsite appointments.
Evaluation of Achieving a College Education Plus: A Credit-Based Transition Program
ERIC Educational Resources Information Center
Luna, Gaye; Fowler, Michael
2011-01-01
This ex post facto study evaluated Achieving a College Education (ACE) Plus program, a credit-based transition program between a high school district and a community college. Achieving a College Education Plus is an early outreach program. It is designed to aid at-risk students in graduating from high school and making a smooth transition to…
49 CFR 37.61 - Public transportation programs and activities in existing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... existing facilities. 37.61 Section 37.61 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.61 Public transportation programs and activities in existing facilities. (a) A public entity shall operate a designated...
44 CFR 16.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: Existing facilities. 16.150 Section 16.150 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT... accessibility: Existing facilities. (a) General. The agency shall operate each program or activity so that the... facilities accessible to and usable by individuals with handicaps; (2) In the case of historic preservation...
9 CFR 307.1 - Facilities for Program employees.
Code of Federal Regulations, 2014 CFR
2014-01-01
... INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION § 307.1 Facilities for Program employees. Office space... employees assigned thereto. The space set aside for this purpose shall meet with approval of the circuit... facilities exist in a nearby convenient location. Laundry service for inspectors' outer work clothing shall...
A Program Management Framework for Facilities Managers
ERIC Educational Resources Information Center
King, Dan
2012-01-01
The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
Mazerolle, Stephanie M; Walker, Stacy E; Thrasher, Ashley Brooke
2015-10-01
Some newly credentialed athletic trainers (ATs) pursue a postprofessional degree with a curriculum that specifically advances their athletic training practice. It is unknown how those postprofessional programs assist in their transition to practice. To gain an understanding of initiatives used by postprofessional athletic training programs to facilitate role transition from student to professional during their graduate degree programs. Qualitative study. Semistructured telephone interviews. A total of 19 program directors (10 men, 9 women) from 13 Commission on Accreditation of Athletic Training Education-accredited and 6 unaccredited postprofessional athletic training programs. Telephone interviews were recorded digitally and transcribed verbatim. For data analysis, we used the principles of general inductive approach. Credibility was maintained using peer review, member checks, and researcher triangulation. Three facilitators of transition to practice emerged: orientation sessions, mentoring, and assistantship. Participants used orientation sessions ranging from a few hours to more than 1 week to provide and discuss program polices and expectations and to outline roles and responsibilities. Faculty, preceptors, and mentors were integrated into the orientation for the academic and clinical portions of the program. All participants described a mentoring process in which students were assigned by the program or informally developed. Mentors included the assigned preceptor, a staff AT, or peer students in the program. The clinical assistantship provided exposure to the daily aspects of being an AT. Barriers to transition to practice included previous educational experiences and time management. Participants reported that students with more diverse didactic and clinical education experiences had easier transitions. The ability to manage time also emerged as a challenge. Postprofessional athletic training programs used a formal orientation session as an initial means to help the newly credentialed AT transition into the role. Mentoring provided both more informal and ongoing support during the transition.
Eime, Rochelle M; Casey, Meghan M; Harvey, Jack T; Charity, Melanie J; Young, Janet A; Payne, Warren R
2015-07-14
Many children are not physically active enough for a health benefit. One avenue of physical activity is modified sport programs, designed as an introduction to sport for young children. This longitudinal study identified trends in participation among children aged 4-12 years. Outcomes included continuation in the modified sports program, withdrawal from the program or transition to club sport competition. De-identified data on participant membership registrations in three popular sports in the Australian state of Victoria were obtained from each sport's state governing body over a 4-year period (2009-2012 for Sport A and 2010-2013 for Sports B and C). From the membership registrations, those who were enrolled in a modified sports program in the first year were tracked over the subsequent three years and classified as one of: transition (member transitioned from a modified sport program to a club competition); continue (member continued participation in a modified sport program; or withdraw (member discontinued a modified program and did not transition to club competition). Many modified sports participants were very young, especially males aged 4-6 years. More children withdrew from their modified sport program rather than transitioning. There were age differences between when boys and girls started, withdrew and transitioned from the modified sports programs. If we can retain children in sport it is likely to be beneficial for their health. This study highlights considerations for the development and implementation of sport policies and programming to ensure lifelong participation is encouraged for both males and females.
NASA Technical Reports Server (NTRS)
1986-01-01
Lockheed Missiles and Space Company's conceptual designs and programmatics for a Space Station Nonhuman Life Sciences Research Facility (LSRF) are presented. Conceptual designs and programmatics encompass an Initial Orbital Capability (IOC) LSRF, a growth or follow-on Orbital Capability (FOC), and the transitional process required to modify the IOC LSFR to the FOC LSFR. The IOC and FOC LSFRs correspond to missions SAAX0307 and SAAX0302 of the Space Station Mission Requirements Database, respectively.
42 CFR 413.340 - Transition period.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING FACILITIES Prospective Payment for Skilled Nursing... the facility-specific rate. Allowable costs associated with exemptions, as described in § 413.30(e)(2... minus 1 percentage point. (c) SNFs participating in the Multistate Nursing Home Case-Mix and Quality...
42 CFR 413.340 - Transition period.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING FACILITIES Prospective Payment for Skilled Nursing... the facility-specific rate. Allowable costs associated with exemptions, as described in § 413.30(e)(2... minus 1 percentage point. (c) SNFs participating in the Multistate Nursing Home Case-Mix and Quality...
42 CFR 413.340 - Transition period.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING FACILITIES Prospective Payment for Skilled Nursing... the facility-specific rate. Allowable costs associated with exemptions, as described in § 413.30(e)(2... minus 1 percentage point. (c) SNFs participating in the Multistate Nursing Home Case-Mix and Quality...
Reiser, Catherine; LeRoy, Bonnie; Grubs, Robin; Walton, Carol
2015-10-01
The master's degree is the required entry-level degree for the genetic counseling profession in the US and Canada. In 2012 the Association of Genetic Counseling Program Directors (AGCPD) passed resolutions supporting retention of the master's as the entry-level and terminal degree and opposing introduction of an entry-level clinical doctorate (CD) degree. An AGCPD workgroup surveyed directors of all 34 accredited training programs with the objective of providing the Genetic Counseling Advanced Degrees Task Force (GCADTF) with information regarding potential challenges if master's programs were required to transition to an entry-level CD. Program demographics, projected ability to transition to an entry-level CD, factors influencing ability to transition, and potential effects of transition on programs, students and the genetic counseling workforce were characterized. Two programs would definitely be able to transition, four programs would close, thirteen programs would be at risk to close and fourteen programs would probably be able to transition with varying degrees of difficulty. The most frequently cited limiting factors were economic, stress on clinical sites, and administrative approval of a new degree/program. Student enrollment under an entry-level CD model was projected to decrease by 26.2 %, negatively impacting the workforce pipeline. The results further illuminate and justify AGCPD's position to maintain the master's as the entry-level degree.
Jones, Justin M; Leedahl, Nathan D; Losing, Ashley; Carson, Paul J; Leedahl, David D
2018-04-01
Lack of patient follow-up is a major concern during care transitions, and the role of an antimicrobial stewardship program (ASP) in assessing antimicrobial regimens after hospital discharge is not well described. We implemented an expanded ASP to include patients recently discharged from the hospital and measured its impact on inappropriate antimicrobial therapy 72 hours after inpatient culture data were finalized. A prospective cohort study was conducted at a 583-bed tertiary care center in the Upper Midwest of America. All patients discharged from our facility on antimicrobial therapy with pending culture results between February 3, 2016, and March 2, 2016, were included for review. If a pathogen nonsusceptible to all prescribed antimicrobials was identified post-discharge, a recommendation for therapy modification was communicated to the prescriber. Thirty-eight patients discharged from our hospital on antimicrobial therapy with pending culture results were evaluated for intervention. When final culture susceptibilities were considered, 5 of 38 patients had been prescribed an inappropriate antimicrobial agent. An ASP pharmacist intervened on 4 of 5 patients, resulting in 3 of 5 patients transitioning to appropriate antimicrobial therapy. When compared to a historical cohort, our transitions-of-care ASP yielded a 3.6-fold increase in antimicrobial-related interventions among discharged patients while reducing inappropriate outpatient antimicrobial therapy by 39%. We believe this is the first pharmacist-driven ASP represented in the medical literature which evaluated all available inpatient culture data to serve patients discharged from the hospital. Antimicrobial stewardship for patients in care transitions may provide an opportunity to increase ASP interventions and reduce inappropriate antimicrobial therapy.
NASA Technical Reports Server (NTRS)
Grinstead, Jay H.; Wilder, Michael C.; Reda, Daniel C.; Cruden, Brett A.; Bogdanoff, David W.
2010-01-01
The Electric Arc Shock Tube (EAST) facility and Hypervelocity Free Flight Aerodynamic Facility (HFFAF, an aeroballistic range) at NASA Ames support basic research in aerothermodynamic phenomena of atmospheric entry, specifically shock layer radiation spectroscopy, convective and radiative heat transfer, and transition to turbulence. Innovative optical instrumentation has been developed and implemented to meet the challenges posed from obtaining such data in these impulse facilities. Spatially and spectrally resolved measurements of absolute radiance of a travelling shock wave in EAST are acquired using multiplexed, time-gated imaging spectrographs. Nearly complete spectral coverage from the vacuum ultraviolet to the near infrared is possible in a single experiment. Time-gated thermal imaging of ballistic range models in flight enables quantitative, global measurements of surface temperature. These images can be interpreted to determine convective heat transfer rates and reveal transition to turbulence due to isolated and distributed surface roughness at hypersonic velocities. The focus of this paper is a detailed description of the optical instrumentation currently in use in the EAST and HFFAF.
Center for Hypersonic Combined Cycle Flow Physics
2015-03-24
team of expert experimentalists and numerical and chemical kinetic modelers. Flowfields were examined in the turbine /ramjet dual inlet mode transition...using data from the NASA Glenn IMX facility and RANS calculations. In the ramjet/scramjet mode regime a dual-mode combustion wind tunnel was developed...SUBJECT TERMS Hypersonic combined cycle propulsion, turbine /ram dual-inlet transition, ram/scram dual-mode transition, hypervelocity regime, RANS, Hybrid
3 CFR - Federal Support for the Randolph-Sheppard Vending Facility Program
Code of Federal Regulations, 2013 CFR
2013-01-01
... 3 The President 1 2013-01-01 2013-01-01 false Federal Support for the Randolph-Sheppard Vending Facility Program Presidential Documents Other Presidential Documents Memorandum of January 20, 2012 Federal Support for the Randolph-Sheppard Vending Facility Program Memorandum for the Heads of Executive Departments and Agencies Thousands of American...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... subrecipients that are public agencies, private companies engaged in public transportation, or private non... DEPARTMENT OF TRANSPORTATION Federal Transit Administration FY 2011 Discretionary Livability... Transportation's (DOT) Federal Transit Administration (FTA) announces the selection of projects funded under two...
Code of Federal Regulations, 2013 CFR
2013-10-01
... public transportation and other high occupancy vehicles, or uses a fixed catenary system and a right of... rail, commuter rail, automated guideway transit, people movers, ferry boat service, and fixed-guideway facilities for buses (such as bus rapid transit) and other high occupancy vehicles. A new fixed guideway...
Code of Federal Regulations, 2014 CFR
2014-10-01
... public transportation and other high occupancy vehicles, or uses a fixed catenary system and a right of... rail, commuter rail, automated guideway transit, people movers, ferry boat service, and fixed-guideway facilities for buses (such as bus rapid transit) and other high occupancy vehicles. A new fixed guideway...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moren, Richard J.; Grindstaff, Keith D.
Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richlandmore » Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.« less
A Survey of Research Performed at NASA Langley Research Center's Impact Dynamics Research Facility
NASA Technical Reports Server (NTRS)
Jackson, K. E.; Fasanella, E. L.
2003-01-01
The Impact Dynamics Research Facility (IDRF) is a 240-ft-high gantry structure located at NASA Langley Research Center in Hampton, Virginia. The facility was originally built in 1963 as a lunar landing simulator, allowing the Apollo astronauts to practice lunar landings under realistic conditions. The IDRF was designated a National Historic Landmark in 1985 based on its significant contributions to the Apollo Program. In 1972, the facility was converted to a full-scale crash test facility for light aircraft and rotorcraft. Since that time, the IDRF has been used to perform a wide variety of impact tests on full-scale aircraft and structural components in support of the General Aviation (GA) aircraft industry, the US Department of Defense, the rotorcraft industry, and NASA in-house aeronautics and space research programs. The objective of this paper is to describe most of the major full-scale crash test programs that were performed at this unique, world-class facility since 1974. The past research is divided into six sub-topics: the civil GA aircraft test program, transport aircraft test program, military test programs, space test programs, basic research, and crash modeling and simulation.
LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOREN RJ; GRINDSTAFF KD
2012-01-11
The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currentlymore » planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.« less
ERIC Educational Resources Information Center
Karpur, Arun; Brewer, David; Golden, Thomas
2014-01-01
Access to effective and comprehensive transition programming is pivotal to transition of youth with disabilities to work and independent living. Successful programs often blend key ingredients, including individualized educational planning, career development, work experiences in secondary school, and interagency partnerships/collaborations.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hopper, Calvin Mitchell
In May 1973 the University of New Mexico conducted the first nationwide criticality safety training and education week-long short course for nuclear criticality safety engineers. Subsequent to that course, the Los Alamos Critical Experiments Facility (LACEF) developed very successful 'hands-on' subcritical and critical training programs for operators, supervisors, and engineering staff. Since the inception of the US Department of Energy (DOE) Nuclear Criticality Technology and Safety Project (NCT&SP) in 1983, the DOE has stimulated contractor facilities and laboratories to collaborate in the furthering of nuclear criticality as a discipline. That effort included the education and training of nuclear criticality safetymore » engineers (NCSEs). In 1985 a textbook was written that established a path toward formalizing education and training for NCSEs. Though the NCT&SP went through a brief hiatus from 1990 to 1992, other DOE-supported programs were evolving to the benefit of NCSE training and education. In 1993 the DOE established a Nuclear Criticality Safety Program (NCSP) and undertook a comprehensive development effort to expand the extant LACEF 'hands-on' course specifically for the education and training of NCSEs. That successful education and training was interrupted in 2006 for the closing of the LACEF and the accompanying movement of materials and critical experiment machines to the Nevada Test Site. Prior to that closing, the Lawrence Livermore National Laboratory (LLNL) was commissioned by the US DOE NCSP to establish an independent hands-on NCSE subcritical education and training course. The course provided an interim transition for the establishment of a reinvigorated and expanded two-week NCSE education and training program in 2011. The 2011 piloted two-week course was coordinated by the Oak Ridge National Laboratory (ORNL) and jointly conducted by the Los Alamos National Laboratory (LANL) classroom education and facility training, the Sandia National Laboratory (SNL) hands-on criticality experiments training, and the US DOE National Criticality Experiment Research Center (NCERC) hands-on criticality experiments training that is jointly supported by LLNL and LANL and located at the Nevada National Security Site (NNSS) This paper provides the description of the bases, content, and conduct of the piloted, and future US DOE NCSP Criticality Safety Engineer Training and Education Project.« less
78 FR 11903 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for public comment... ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities.'' The draft NUREG provides guidance to... a fuel cycle facility is acceptable. DATES: Comments may be submitted by April 22, 2013. Comments...
Zakumumpa, Henry; Bennett, Sara; Ssengooba, Freddie
2016-10-18
Uganda implemented a national ART scale-up program at public and private health facilities between 2004 and 2009. Little is known about how and why some health facilities have sustained ART programs and why others have not sustained these interventions. The objective of the study was to identify facilitators and barriers to the long-term sustainability of ART programs at six health facilities in Uganda which received donor support to commence ART between 2004 and 2009. A case-study approach was adopted. Six health facilities were purposively selected for in-depth study from a national sample of 195 health facilities across Uganda which participated in an earlier study phase. The six health facilities were placed in three categories of sustainability; High Sustainers (2), Low Sustainers (2) and Non- Sustainers (2). Semi-structured interviews with ART Clinic managers (N = 18) were conducted. Questionnaire data were analyzed (N = 12). Document review augmented respondent data. Based on the data generated, across-case comparative analyses were performed. Data were collected between February and June 2015. Several distinguishing features were found between High Sustainers, and Low and Non-Sustainers' ART program characteristics. High Sustainers had larger ART programs with higher staffing and patient volumes, a broader 'menu' of ART services and more stable program leadership compared to the other cases. High Sustainers associated sustained ART programs with multiple funding streams, robust ART program evaluation systems and having internal and external program champions. Low and Non Sustainers reported similar barriers of shortage and attrition of ART-proficient staff, low capacity for ART program reporting, irregular and insufficient supply of ARV drugs and a lack of alignment between ART scale-up and their for-profit orientation in three of the cases. We found that ART program sustainability was embedded in a complex system involving dynamic interactions between internal (program champion, staffing strength, M &E systems, goal clarity) and external drivers (donors, ARVs supply chain, patient demand). ART program sustainability contexts were distinguished by the size of health facility and ownership-type. The study's implications for health systems strengthening in resource-limited countries are discussed.
2015-08-04
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2016. In addition, it specifies a SNF all-cause all-condition hospital readmission measure, as well as adopts that measure for a new SNF Value-Based Purchasing (VBP) Program, and includes a discussion of SNF VBP Program policies we are considering for future rulemaking to promote higher quality and more efficient health care for Medicare beneficiaries. Additionally, this final rule will implement a new quality reporting program for SNFs as specified in the Improving Medicare Post-Acute Care Transformation Act of 2014 (IMPACT Act). It also amends the requirements that a long-term care (LTC) facility must meet to qualify to participate as a skilled nursing facility (SNF) in the Medicare program, or a nursing facility (NF) in the Medicaid program, by establishing requirements that implement the provision in the Affordable Care Act regarding the submission of staffing information based on payroll data.
Competitive Facility Location with Fuzzy Random Demands
NASA Astrophysics Data System (ADS)
Uno, Takeshi; Katagiri, Hideki; Kato, Kosuke
2010-10-01
This paper proposes a new location problem of competitive facilities, e.g. shops, with uncertainty and vagueness including demands for the facilities in a plane. By representing the demands for facilities as fuzzy random variables, the location problem can be formulated as a fuzzy random programming problem. For solving the fuzzy random programming problem, first the α-level sets for fuzzy numbers are used for transforming it to a stochastic programming problem, and secondly, by using their expectations and variances, it can be reformulated to a deterministic programming problem. After showing that one of their optimal solutions can be found by solving 0-1 programming problems, their solution method is proposed by improving the tabu search algorithm with strategic oscillation. The efficiency of the proposed method is shown by applying it to numerical examples of the facility location problems.
Kennedy Space Center Spaceport Analysis
NASA Technical Reports Server (NTRS)
Wary, Samantha A.
2013-01-01
Until the Shuttle Atlantis' final landing on July 21, 2011, Kennedy Space Center (KSC) served as NASA's main spaceport, which is a launch and landing facility for rockets and spacecraft that are attempting to enter orbit. Many of the facilities at KSC were created to assist the Shuttle Program. One of the most important and used facilities is the Shuttle Landing Facility (SLF), This was the main landing area for the return of the shuttle after her mission in space. · However, the SLF has also been used for a number of other projects including straight-line testing by Gibbs Racing, weather data collection by NOAA, and an airfield for the KSC helicopters. This runway is three miles long with control tower at midfield and a fire department located at the end in care of an emergency. This facility, which was part of the great space race, will continue to be used for historical events as Kennedy begins to commercialize its facilities. KSC continues to be an important spaceport to the government, and it will transform into an important spaceport for the commercial industry as well. During my internship at KSC's Center Planning and Development Directorate, I had the opportunity to be a part of the negotiation team working on the agreement for Space Florida to control the Shuttle Landing Facility. This gave me the opportunity to learn about all the changes that are occurring here at Kennedy Space Center. Through various meetings, I discovered the Master Plan and its focus is to transform the existing facilities that were primarily used for the Shuttle Program, to support government operations and commercial flights in the future. This. idea is also in a new strategic business plan and completion of a space industry market analysis. All of these different documentations were brought to my attention and I. saw how they came together in the discussions of transitioning the SLF to a commercial operator, Space Florida. After attending meetings and partaking in discussions for the SLF Agreement, I formed the idea of a Spaceport Analysis as my over internship project. As previously stated, I had the opportunity to sit in on the market analysis meetings and read through the analysis itself. I suggested the creation of a Strengths Weaknesses Opportunities Threats (SWOT) analysis, which allows an individual to see an overview of the company's strengths and weaknesses alongside any industry opportunities and threats. After discussions with the lead writer of the new strategic business plan and getting approval, I took the action upon myself and created the Kennedy Space Center SWOT Analysis.
Baloush-Kleinman, Vered; Schneidman, Michael
2003-01-01
Deinstitutionalization and community mental health services have become the focus of mental health care in the United States, Italy and England, and now in Israel. Tirat Carmel MHC developed an intervention model of organizational change implemented in a rehabilitation hostel. It is an interim service based on graduated transition from maintenance care to a transitional Half-way House, followed by a Transitional Living Skills Center oriented for independent community living. Of 205 rehabilitees who resided in the hostel since the beginning of the project, 138 were discharged to community residential settings: 67 patients were discharged to reinforced community hostels; 27 to sheltered housing and 23 to independent residential quarters; 7 patients were discharged to comprehensive hostels, 3 to old-age homes and 11 returned home to their families. In terms of employment, 79 were placed in sheltered employment facilities, 24 work in the open market and 3 returned to school; 22 work in therapeutic occupational settings and 10 patients discharged to comprehensive hostels and old-age homes are engaged in sheltered employment programs in those settings. The system flexibility model and the rehabilitation processes anchored in normalization supported the relocation of hospitalized psychiatric patients to community-based settings and enabled the rehabilitees to cope with readjustment to community life.
Transitions of care and rehabilitation after fragility fractures.
Eslami, Michelle; Tran, Hong-Phuc
2014-05-01
Transitions in care are a vulnerable time period for patients during which unintended errors may occur. This article discusses potential risks that could occur during care transitions, suggested improvements, and the transition from hospital to skilled nursing facilities for patients needing rehabilitation after their discharge from the hospital. Different rehabilitation settings and their reimbursement are reviewed. Common potential medical conditions arising in patients undergoing rehabilitation, rehabilitation goals, and secondary prevention also are discussed. Copyright © 2014 Elsevier Inc. All rights reserved.
The costs of transit fare prepayment programs : a parametric cost analysis.
DOT National Transportation Integrated Search
Despite the renewed interest in transit fare prepayment plans over the past : 10 years, few transit managers have a clear idea of how much it costs to operate : and maintain a fare prepayment program. This report provides transit managers : with the ...
Nace, David A; Handler, Steven M; Hoffman, Erika L; Perera, Subashan
2012-11-01
National influenza immunization rates for healthcare workers (HCW) in long-term care (LTC) remain unacceptably low. This poses a serious public health threat to residents. Prior work has suggested high staff turnover rates as a contributing factor to low immunization rates. There is a critical need to identify and deploy successful models of HCW influenza immunization programs to LTC facilities. This report describes one potential model that has been successfully initiated in a network of LTC facilities. All facilities served by a single regional LTC pharmacy were invited to participate in a HCW influenza immunization program. This voluntary immunization program began in 2005 and continues to the present. As part of the program, the pharmacy promoted organizational change by assuming oversight and control of HCW immunization policies and processes for all facilities. Primary and secondary outcomes are the number of facilities reaching HCW influenza immunization rates of 60% and 80%. Fourteen of the 16 LTC facilities participated. Facilities were diverse and included both nursing and assisted living facilities; unionized and nonunionized facilities; and urban, suburban, and rural facilities. The pharmacy provided educational and communication materials, centralized data collection using a standardized definition for HCW immunization rates, and facility feedback. All 14 LTC facilities achieved the primary goal of 60% and nearly two thirds reached the secondary goal of 80%. Twenty percent reached the new Healthy People 2020 goal of 90%. It is possible for LTC facilities to improve HCW immunization rates using a pharmacy based, voluntary HCW influenza immunization approach. Such an approach may help attenuate the negative influence of staff turnover on HCW immunizations. Attainment of the new Health People 2020 goals still remains a challenge and may require mandatory programs. Copyright © 2012 American Medical Directors Association, Inc. Published by Elsevier Inc. All rights reserved.
12 CFR 268.707 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Programs and Activities Because of Physical or Mental Disability § 268.707 Program accessibility: Existing facilities. (a) General. The Board shall operate each program or activity so that the program or activity... can demonstrate would result in a fundamental alteration in the nature of a program or activity or in...
12 CFR 268.707 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Programs and Activities Because of Physical or Mental Disability § 268.707 Program accessibility: Existing facilities. (a) General. The Board shall operate each program or activity so that the program or activity... can demonstrate would result in a fundamental alteration in the nature of a program or activity or in...
ERIC Educational Resources Information Center
Peterson, Patricia; Ellsworth, J'Anne; Penny, Dave
The Continental Project is a school-to-work transition program for students with disabilities. The 6-year old program, which is located at a country club and golf course, serves more than 20 students per year and has successfully transitioned 45 young adults with moderate to severe handicaps into the workforce. The program is a cooperative effort…
Workplace Violence Training Programs for Health Care Workers: An Analysis of Program Elements.
Arbury, Sheila; Hodgson, Michael; Zankowski, Donna; Lipscomb, Jane
2017-06-01
Commercial workplace violence (WPV) prevention training programs differ in their approach to violence prevention and the content they present. This study reviews 12 such programs using criteria developed from training topics in the Occupational Safety and Health Administration's (OSHA) Guidelines for Preventing Workplace Violence for Healthcare and Social Service Workers and a review of the WPV literature. None of the training programs addressed all the review criteria. The most significant gap in content was the lack of attention to facility-specific risk assessment and policies. To fill this gap, health care facilities should supplement purchased training programs with specific training in organizational policies and procedures, emergency action plans, communication, facility risk assessment, and employee post-incident debriefing and monitoring. Critical to success is a dedicated program manager who understands risk assessment, facility clinical operations, and program management and evaluation.
Combined sewer systems collect rainwater runoff, sewage, and industrial wastewater for transit to treatment facilities. With heavy precipitation, volumes can exceed capacity of treatment facilities, and wastewater discharges directly to receiving waters. These combined sewer over...
Fundamental Elements of Transition Program Design
ERIC Educational Resources Information Center
Karmelita, Courtney
2017-01-01
Adult learners require supports and services to help them successfully transition into taking on the demands and expectations of college students. Transition programs have grown in popularity as a means to aid adult learners as they transition to higher education. Unfortunately, previous research on adult learner participation in transition…
Public transportation research study : evaluation of shared use park & ride impact on properties
DOT National Transportation Integrated Search
2004-04-01
The purpose of this study is to document the economic benefit of shared use park and ride : facilities located at retail centers. Transit agencies usually perceive shared use park and : ride as mutually beneficial to both the transit agency through s...
NASA Technical Reports Server (NTRS)
Goodman, Kyle Z.; Lipford, William E.; Watkins, Anthony Neal
2016-01-01
Detection of flow transition on aircraft surfaces and models can be vital to the development of future vehicles and computational methods for evaluating vehicle concepts. In testing at ambient conditions, IR thermography is ideal for this measurement. However, for higher Reynolds number testing, cryogenic facilities are often used, in which IR thermography is difficult to employ. In these facilities, temperature sensitive paint is an alternative with a temperature step introduced to enhance the natural temperature change from transition. Traditional methods for inducing the temperature step by changing the liquid nitrogen injection rate often change the tunnel conditions. Recent work has shown that adding a layer consisting of carbon nanotubes to the surface can be used to impart a temperature step on the model surface with little change in the operating conditions. Unfortunately, this system physically degraded at 130 K and lost heating capability. This paper describes a modification of this technique enabling operation down to at least 77 K, well below the temperature reached in cryogenic facilities. This is possible because the CNT layer is in a polyurethane binder. This was tested on a Natural Laminar Flow model in a cryogenic facility and transition detection was successfully visualized at conditions from 200 K to 110 K. Results were also compared with the traditional temperature step method.
Goodman, Kyle Z; Lipford, William E; Watkins, Anthony Neal
2016-12-03
Detection of flow transition on aircraft surfaces and models can be vital to the development of future vehicles and computational methods for evaluating vehicle concepts. In testing at ambient conditions, IR thermography is ideal for this measurement. However, for higher Reynolds number testing, cryogenic facilities are often used, in which IR thermography is difficult to employ. In these facilities, temperature sensitive paint is an alternative with a temperature step introduced to enhance the natural temperature change from transition. Traditional methods for inducing the temperature step by changing the liquid nitrogen injection rate often change the tunnel conditions. Recent work has shown that adding a layer consisting of carbon nanotubes to the surface can be used to impart a temperature step on the model surface with little change in the operating conditions. Unfortunately, this system physically degraded at 130 K and lost heating capability. This paper describes a modification of this technique enabling operation down to at least 77 K, well below the temperature reached in cryogenic facilities. This is possible because the CNT layer is in a polyurethane binder. This was tested on a Natural Laminar Flow model in a cryogenic facility and transition detection was successfully visualized at conditions from 200 K to 110 K. Results were also compared with the traditional temperature step method.
Goodman, Kyle Z.; Lipford, William E.; Watkins, Anthony Neal
2016-01-01
Detection of flow transition on aircraft surfaces and models can be vital to the development of future vehicles and computational methods for evaluating vehicle concepts. In testing at ambient conditions, IR thermography is ideal for this measurement. However, for higher Reynolds number testing, cryogenic facilities are often used, in which IR thermography is difficult to employ. In these facilities, temperature sensitive paint is an alternative with a temperature step introduced to enhance the natural temperature change from transition. Traditional methods for inducing the temperature step by changing the liquid nitrogen injection rate often change the tunnel conditions. Recent work has shown that adding a layer consisting of carbon nanotubes to the surface can be used to impart a temperature step on the model surface with little change in the operating conditions. Unfortunately, this system physically degraded at 130 K and lost heating capability. This paper describes a modification of this technique enabling operation down to at least 77 K, well below the temperature reached in cryogenic facilities. This is possible because the CNT layer is in a polyurethane binder. This was tested on a Natural Laminar Flow model in a cryogenic facility and transition detection was successfully visualized at conditions from 200 K to 110 K. Results were also compared with the traditional temperature step method. PMID:27918493
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.; Sibille, Laurent; Sacksteder, Kurt; Owens, Chuck
2005-01-01
The NASA Microgravity Science program has transitioned research required in support of NASA s Vision for Space Exploration. Research disciplines including the Materials Science, Fluid Physics and Combustion Science are now being applied toward projects with application in the planetary utilization and transformation of space resources. The scientific and engineering competencies and infrastructure in these traditional fields developed at multiple NASA Centers and by external research partners provide essential capabilities to support the agency s new exploration thrusts including In-Situ Resource Utilization (ISRU). Among the technologies essential to human space exploration, the production of life support consumables, especially oxygen and; radiation shielding; and the harvesting of potentially available water are realistically achieved for long-duration crewed missions only through the use of ISRU. Ongoing research in the physical sciences have produced a body of knowledge relevant to the extraction of oxygen from lunar and planetary regolith and associated reduction of metals and silicon for use meeting manufacturing and repair requirements. Activities being conducted and facilities used in support of various ISRU projects at the Glenn Research Center and Marshall Space Flight Center will be described. The presentation will inform the community of these new research capabilities, opportunities, and challenges to utilize their materials, fluids and combustion science expertise and capabilities to support the vision for space exploration.
ERIC Educational Resources Information Center
Ainley, John G.
This report is a study conducted by the Australian Council for Educational Research to evaluate the influence of science material resources, provided under the Australian Science Facilities Program, on science education in Australia. Under the Australian Science Facilities Program some $123 million was spent, between July 1964 and June 1975, on…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... to qualify to participate as a skilled nursing facility (SNF) in the Medicare program, or as a nursing facility (NF) in the Medicaid program. We are proposing these requirements to ensure that long... According to CMS data, at any point in time, approximately 1.4 million elderly and disabled nursing home...
Sandia and NJ TRANSIT Authority Developing Resilient Power Grid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanley, Charles J.; Ellis, Abraham
2014-11-01
Through the memorandum of understanding between the Depratment of Energy (DOE), the New Jersey Transit Authority (NJ Transit), and the New Jersey Board of Public Utilities, Sandia National Labs is assisting NJ Transit in developing NJ TransitGrid: an electric microgrid that will include a large-scale gas-fired generation facility and distributed energy resources (photovoltaics [PV], energy storage, electric vehicles, combined heat and power [CHP]) to supply reliable power during storms or other times of significant power failure. The NJ TransitGrid was awarded $410M from the Department of Transportation to develop a first-of-its-kind electric microgrid capable of supplying highly-reliable power.
Environmental practices for biomedical research facilities.
Medlin, E L; Grupenhoff, J T
2000-01-01
As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360
32 CFR 1906.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... INTELLIGENCE AGENCY ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE CENTRAL INTELLIGENCE AGENCY § 1906.150 Program accessibility: Existing facilities. (a...
32 CFR 1906.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... INTELLIGENCE AGENCY ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE CENTRAL INTELLIGENCE AGENCY § 1906.150 Program accessibility: Existing facilities. (a...
32 CFR 1906.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... INTELLIGENCE AGENCY ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE CENTRAL INTELLIGENCE AGENCY § 1906.150 Program accessibility: Existing facilities. (a...
32 CFR 1906.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... INTELLIGENCE AGENCY ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE CENTRAL INTELLIGENCE AGENCY § 1906.150 Program accessibility: Existing facilities. (a...
32 CFR 1906.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTELLIGENCE AGENCY ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE CENTRAL INTELLIGENCE AGENCY § 1906.150 Program accessibility: Existing facilities. (a...
Correlates of quality educational programs.
Chester, Deborah R; Tracy, Jessamyn A; Earp, Emily; Chauhan, Reetu
2002-06-01
Preliminary evaluation findings are presented that explore relationships between educational program quality and program characteristics such as program type, security level, aftercare, teacher certification, facility size, and private versus public provider. Several program characteristics are found to be related to measurements of educational program quality. Among the major quality characteristics are proportion of program teachers that are professionally certified, smaller sized facilities versus larger facilities, level of aftercare services, and provider sources, with private for-profit providers being the lowest performing and public providers being the highest performing. The article closes with description of the Juvenile Justice Educational Enhancement Program's continuing evaluation of correlates to educational program quality through the continued development of a comprehensive database.
Friendship Experiences of Participants in a University Based Transition Program
ERIC Educational Resources Information Center
Nasr, Maya; Cranston-Gingras, Ann; Jang, Seung-Eun
2015-01-01
This study examined the nature of friendships of 14 students with intellectual and developmental disabilities participating in a university-based transition program in the United States. The transition program is a bridge between high school and adulthood, designed to foster students' self-esteem and self-confidence by providing them with training…
2016-08-05
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2017. In addition, it specifies a potentially preventable readmission measure for the Skilled Nursing Facility Value-Based Purchasing Program (SNF VBP), and implements requirements for that program, including performance standards, a scoring methodology, and a review and correction process for performance information to be made public, aimed at implementing value-based purchasing for SNFs. Additionally, this final rule includes additional polices and measures in the Skilled Nursing Facility Quality Reporting Program (SNF QRP). This final rule also responds to comments on the SNF Payment Models Research (PMR) project.
McDonald, Paige L; Harwood, Kenneth J; Butler, Joan T; Schlumpf, Karen S; Eschmann, Carson W; Drago, Daniela
2018-12-01
Intensive courses (ICs), or accelerated courses, are gaining popularity in medical and health professions education, particularly as programs adopt e-learning models to negotiate challenges of flexibility, space, cost, and time. In 2014, the Department of Clinical Research and Leadership (CRL) at the George Washington University School of Medicine and Health Sciences began the process of transitioning two online 15-week graduate programs to an IC model. Within a year, a third program also transitioned to this model. A literature review yielded little guidance on the process of transitioning from 15-week, traditional models of delivery to IC models, particularly in online learning environments. Correspondingly, this paper describes the process by which CRL transitioned three online graduate programs to an IC model and details best practices for course design and facilitation resulting from our iterative redesign process. Finally, we present lessons-learned for the benefit of other medical and health professions' programs contemplating similar transitions. CRL: Department of Clinical Research and Leadership; HSCI: Health Sciences; IC: Intensive course; PD: Program director; QM: Quality Matters.
McDonald, Paige L.; Harwood, Kenneth J.; Butler, Joan T.; Schlumpf, Karen S.; Eschmann, Carson W.; Drago, Daniela
2018-01-01
ABSTRACT Intensive courses (ICs), or accelerated courses, are gaining popularity in medical and health professions education, particularly as programs adopt e-learning models to negotiate challenges of flexibility, space, cost, and time. In 2014, the Department of Clinical Research and Leadership (CRL) at the George Washington University School of Medicine and Health Sciences began the process of transitioning two online 15-week graduate programs to an IC model. Within a year, a third program also transitioned to this model. A literature review yielded little guidance on the process of transitioning from 15-week, traditional models of delivery to IC models, particularly in online learning environments. Correspondingly, this paper describes the process by which CRL transitioned three online graduate programs to an IC model and details best practices for course design and facilitation resulting from our iterative redesign process. Finally, we present lessons-learned for the benefit of other medical and health professionsʼ programs contemplating similar transitions. Abbreviations: CRL: Department of Clinical Research and Leadership; HSCI: Health Sciences; IC: Intensive course; PD: Program director; QM: Quality Matters PMID:29277143
Arts Education Facilities Planner for Grades 9-12.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Support.
This document suggests facilities necessary to conduct instruction in arts programs in grades 9-12 and conveys essential features that should be present. As a reference document for school facilities designers, it describes arts education programs and the facilities that support them, with some sections focusing on the concepts and features common…
Ghani, Mansur A; Brown, Shan-Estelle; Khan, Farrah; Wickersham, Jeffrey A; Lim, Sin How; Dhaliwal, Sangeeth K; Kamarulzaman, Adeeba; Altice, Frederick L
2015-02-01
In Malaysia, compulsory drug detention centres (CDDCs) hold suspected drug users for two years without adjudication. Acute detoxification without healthcare access has been documented. CDDCs are criticized globally due to ineffectiveness in treating addiction and human rights violations. In response, the Malaysian government began transitioning these facilities into voluntary drug treatment centres known as "Cure and Care" (C&C) centres that embrace a holistic treatment-based approach to drug addiction rehabilitation. An explorative qualitative study was undertaken to explore patient perspectives and satisfaction regarding treatment and services at the new Cure and Care centre in Kota Bharu, Malaysia. A convenience sample of 20 patients was recruited to participate in semi-structured in-depth interviews. Content analysis was used to identify the salient themes. Patients identified methadone treatment, psychosocial programs, religious instruction, and recreational activities as important factors contributing to treatment success for addressing both health and addiction needs. Though many had previously been in a CDDC, adherence to treatment in the C&C centre was perceived to be facilitated by the degree of social support, the voluntary nature and the array of new programs available for selection. C&Cs represents a dramatic shift in the Malaysian government's approach to drug addiction. Our findings demonstrate positive patient experiences associated with the holistic treatment-based approach of these centres. This exploratory study provides additional evidence to document this ongoing policy transition and may guide continued expansion of new holistic drug treatment programs across the country. Copyright © 2014 Elsevier B.V. All rights reserved.
Ghani, Mansur A.; Brown, Shan-Estelle; Khan, Farrah; Wickersham, Jeffrey A.; Lim, Sin How; Dhaliwal, Sangeeth K.; Kamarulzaman, Adeeba; Altice, Frederick L.
2014-01-01
Background In Malaysia, compulsory drug detention centres (CDDCs) hold suspected drug users for two years without adjudication. Acute detoxification without healthcare access has been documented. CDDCs are criticized globally due to ineffectiveness in treating addiction and human rights violations. In response, the Malaysian government began transitioning these facilities into voluntary drug treatment centres known as “Cure and Care” (C&C) centres that embrace a holistic treatment-based approach to drug addiction rehabilitation. Methods An explorative qualitative study was undertaken to explore patient perspectives and satisfaction regarding treatment and services at the new Cure and Care centre in Kota Bharu, Malaysia. A convenience sample of 20 patients was recruited to participate in semi-structured in-depth interviews. Content analysis approach was used to identify the salient themes. Results Patients identified methadone treatment, psychosocial programs, religious instruction, and recreational activities as important factors contributing to treatment success for addressing both health and addiction needs. Though many had previously been in a CDDC, adherence to treatment in the C&C centre was perceived to be facilitated by the degree of social support, the voluntary nature and the array of new programs available for selection. Conclusion C&Cs represents a dramatic shift in the Malaysian government’s approach to drug addiction. Our findings demonstrate positive patient experiences associated with the holistic treatment-based approach of these centres. This exploratory study provides additional evidence to document this ongoing policy transition and may guide continued expansion of new holistic drug treatment programs across the country. PMID:25577322
Gilmore-Bykovskyi, Andrea L; Roberts, Tonya J; King, Barbara J; Kennelty, Korey A; Kind, Amy J H
2017-10-01
To describe skilled nursing facility (SNF) nurses' perspectives on the experiences and needs of persons with dementia (PwD) during hospital-to-SNF transitions and to identify factors related to the quality of these transitions. Grounded dimensional analysis study using individual and focus group interviews with nurses (N = 40) from 11 SNFs. Hospital-to-SNF transitions were largely described as distressing for PwD and their caregivers and dominated by dementia-related behavioral symptoms that were perceived as being purposely under-communicated by hospital personnel in discharge communications. SNF nurses described PwD as having unique transitional care needs, which primarily involved needing additional discharge preplanning to enable preparation of a tailored behavioral/social care plan and physical environment prior to transfer. SNF nurses identified inaccurate/limited hospital discharge communication regarding behavioral symptoms, short discharge timeframes, and limited nursing control over SNF admission decisions as factors that contributed to poorer-quality transitions producing increased risk for resident harm, rehospitalization, and negative resident/caregiver experiences. Engaged caregivers throughout the transition and the presence of high-quality discharge communication were identified as factors that improved the quality of transitions for PwD. Findings from this study provide important insight into factors that may influence transitional care quality during this highly vulnerable transition. Additional research is needed to explore the association between these factors and transitional care outcomes such as rehospitalization and caregiver stress. Future work should also explore strategies to improve inter-setting communication and care coordination for PwD exhibiting challenging behavioral symptoms. Published by Oxford University Press on behalf of the Gerontological Society of America 2016.
NASA Astrophysics Data System (ADS)
Kriebel, M. M.; Stevens, N. J.
1992-07-01
TRW, Rocket Research Co and Defense Systems Inc are developing a space qualified 30-kW class arcjet flight unit as a part of the Arcjet ATTD program. During space operation the package will measure plume deposition and contamination, electromagnetic interference, thermal radiation, arcjet thruster performance, and plume heating in order to quantify arcjet operational interactions. The Electric Propulsion Space Experiment (ESEX) diagnostic package is described. The goals of ESEX are the demonstration of a high powered arcjet performance and the measurement of potential arcjet-spacecraft interactions which cannot be determined in ground facilities. Arcjet performance, plume characterization, thermal radiation flux and the electromagnetic interference (EMI) experiment as well as experiment operations with a preliminary operations plan are presented.
Research program for experiment M133
NASA Technical Reports Server (NTRS)
Frost, J. D., Jr.
1972-01-01
The development of the automatic data-acquisition and sleep-analysis system is reported. The purpose was consultation and evaluation in the transition of the Skylab M133 Sleep-Monitoring Experiment equipment from prototype of flight status; review of problems associated with acquisition and on-line display of data in near-real time via spacecraft telemetry; and development of laboratory facilities and design of equipment to assure reliable playback and analysis of analog data. The existing prototype system modified, and the changes improve the performance of the analysis circuitry and increase its reliability. These modifications are useful for pre- and postflight analysis, but are not now proposed for the inflight system. There were improvements in the EEG recording cap, some of which will be incorporated into the flight hardware.
Institutional environmental impact statement, Michoud Assembly Facility, New Orleans, Louisiana
NASA Technical Reports Server (NTRS)
1978-01-01
A description and analysis of Michoud Assembly Facility as an operational base for both NASA and NASA-related programs and various government tenant-agencies and their contractors is given. Tenant-agencies are governmental agencies or governmental agency contractors which are not involved in a NASA program, but utilize office or manufacturing space at the Michoud Assembly Facility. The statements represent the full description of the likely environmental effects of the facility and are used in the process of making program and project decisions.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... (Destination Therapy) Facilities. XIII Medicare-Approved Lung Volume Reduction Surgery JoAnna Baldwin, MS (410) 786-7205 Facilities. XIV Medicare-Approved Bariatric Surgery Facilities........ Kate Tillman, RN, MAS...
DOT National Transportation Integrated Search
2001-05-01
The purpose of this project was to undertake a consolidated comprehensive review of the Florida Department of Transportation Transit Corridor Program. Technical Memorandum Number One provides a summary of all transit corridor projects either under wa...
29 CFR 4907.150 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE PENSION BENEFIT GUARANTY CORPORATION § 4907.150 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or activity so that the program or activity, when viewed in its entirety, is readily accessible to and usable by handicapped...
32 CFR 1699.150 - Program accessibility: existing facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SYSTEM ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY SELECTIVE SERVICE SYSTEM § 1699.150 Program accessibility: existing facilities. (a) General. The agency shall operate each program or activity so that the program or activity, when viewed in its entirety, is...
Space Nuclear Thermal Propulsion (SNTP) Air Force facility
NASA Technical Reports Server (NTRS)
Beck, David F.
1993-01-01
The Space Nuclear Thermal Propulsion (SNTP) Program is an initiative within the US Air Force to acquire and validate advanced technologies that could be used to sustain superior capabilities in the area or space nuclear propulsion. The SNTP Program has a specific objective of demonstrating the feasibility of the particle bed reactor (PBR) concept. The term PIPET refers to a project within the SNTP Program responsible for the design, development, construction, and operation of a test reactor facility, including all support systems, that is intended to resolve program technology issues and test goals. A nuclear test facility has been designed that meets SNTP Facility requirements. The design approach taken to meet SNTP requirements has resulted in a nuclear test facility that should encompass a wide range of nuclear thermal propulsion (NTP) test requirements that may be generated within other programs. The SNTP PIPET project is actively working with DOE and NASA to assess this possibility.
Cradock, Angie L; Barrett, Jessica L; Chriqui, Jamie F; Evenson, Kelly R; Goins, Karin Valentine; Gustat, Jeanette; Heinrich, Katie M; Perry, Cynthia K; Scanze, Michele; Schmid, Thomas L; Tabak, Rachel G; Umstattd Meyer, M Renee; Valko, Cheryl
2018-03-01
To assess predictors of stated support for policies promoting physically active transportation. Cross-sectional. US counties selected on county-level physical activity and obesity health status. Participants completing random-digit dialed telephone survey (n = 906). Survey measures assessed stated support for 5 policies to promote physically active transportation, access to active transportation facilities, and time spent in a car. County-level estimates included household car dependence and funding for bicycle-pedestrian projects. Multivariable generalized linear mixed models using binary distribution and logit link, accounting for clustering within county. Respondents supported policies for accommodating bicyclists and pedestrians through street improvements (89%), school active transportation programs (75%), employer-funded active commuting incentives (67%), and allocation of public funding (68%) and tax support (56%) for building and maintaining public transit. Residents spending >2 h/d (vs <0.7 hours) in cars were more likely to support street (odds ratio [OR]: 1.87; confidence interval [CI]: 1.09-3.22) and public transit (OR: 1.85; CI: 1.24-2.77) improvements. Residents in counties investing >$1.6 million in bicycle and pedestrian improvements expressed greater support for funding (OR: 1.71; CI: 1.04-2.83) and tax increases (OR: 1.73; CI: 1.08-2.75) for transit improvements compared to those with lower prior investments (<$276 100). Support for policies to enable active transportation is higher where relevant investments in active transportation infrastructure are large (>$1.6 M), public transit is nearby, and respondents drive >2 h/d.
NASA Astrophysics Data System (ADS)
Laanait, Nouamane; Li, Qian; Zhang, Zhan; Kalinin, Sergei
Electric field-driven phase transitions in multiferroic systems such as Bismuth Ferrite could potentially host interesting domain dynamics due to the coexistence of multiple order parameters. Structural imaging of these dynamics under a host of elastic and electric boundary conditions is therefore of interest. Here, we present X-ray diffraction microscopy (XDM) studies of the domain wall dynamics in a bismuth ferrite thin-film near the field-driven transition from rhombohedral to monoclinic (R to M). XDM is a novel full-field imaging technique that uses Bragg diffraction contrast to image structural configurations with sub-100nm lateral resolutions and fast acquisition times (milliseconds to seconds per image). We find that under electric fields 100 kV/cm, a bismuth ferrite thin-film (100 nm BiFeO3/DyScO3 (110)) undergoes a structural phase transition but that this new phase (M) is pinned by the preexisting ferroelectric/ferroelastic stripe phase (R). At higher fields ( 300 kV/cm), we observe unusually slow domain wall dynamics in the stripe phase, consisting of periodicity doubling, domain wall roughening and crowding. These observed ferroelastic domain wall spatial dynamics are weakly constrained by the crystal symmetry of the orthorhombic substrate but exhibit nonlinear dynamics more commonly associated with disordered nematic systems. This work was supported by the Eugene P. Wigner Fellowship program at Oak Ridge National Laboratory, a U.S. Department of Energy facility.
Mark, Daniella; Armstrong, Alice; Andrade, Catarina; Penazzato, Martina; Hatane, Luann; Taing, Lina; Runciman, Toby; Ferguson, Jane
2017-05-16
In 2013, an estimated 2.1 million adolescents (age 10-19 years) were living with HIV globally. The extent to which health facilities provide appropriate treatment and care was unknown. To support understanding of service availability in 2014, Paediatric-Adolescent Treatment Africa (PATA), a non-governmental organisation (NGO) supporting a network of health facilities across sub-Saharan Africa, undertook a facility-level situational analysis of adolescent HIV treatment and care services in 23 countries. Two hundred and eighteen facilities, responsible for an estimated 80,072 HIV-infected adolescents in care, were surveyed. Sixty per cent of the sample were from PATA's network, with the remaining gathered via local NGO partners and snowball sampling. Data were analysed using descriptive statistics and coding to describe central tendencies and identify themes. Respondents represented three subregions: West and Central Africa ( n = 59; 27%), East Africa ( n = 77, 35%) and southern Africa ( n = 82, 38%). Half (50%) of the facilities were in urban areas, 17% peri-urban and 33% rural settings. Insufficient data disaggregation and outcomes monitoring were critical issues. A quarter of facilities did not have a working definition of adolescence. Facilities reported non-adherence as their key challenge in adolescent service provision, but had insufficient protocols for determining and managing poor adherence and loss to follow-up. Adherence counselling focused on implications of non-adherence rather than its drivers. Facilities recommended peer support as an effective adherence and retention intervention, yet not all offered these services. Almost two-thirds reported attending to adolescents with adults and/or children, and half had no transitioning protocols. Of those with transitioning protocols, 21% moved pregnant adolescents into adult services earlier than their peers. There was limited sexual and reproductive health integration, with 63% of facilities offering these services within their HIV programmes and 46% catering to the special needs of HIV-infected pregnant adolescents. Results indicate that providers are challenged by adolescent adherence and reflect an insufficiently targeted approach for adolescents. Guidance on standard definitions for adherence, retention and counselling approaches is needed. Peer support may create an enabling environment and sensitize personnel. Service delivery gaps should be addressed, with standardized transition and quality counselling. Integrated, comprehensive sexual reproductive health services are needed, with support for pregnant adolescents.
Status of the NICA project at JINR
NASA Astrophysics Data System (ADS)
Kekelidze, Vladimir; Kovalenko, Alexandr; Lednicky, Rihard; Matveev, Viktor; Meshkov, Igor; Sorin, Alexandr; Trubnikov, Grigory
2017-03-01
The NICA (Nuclotron-based Ion Collider fAcility) project is now under active realization at the Joint Institute for Nuclear Research (JINR, Dubna). The main goal of the project is a study of hot and dense strongly interacting matter in heavy-ion (up to Au) collisions at the center-of-mass energies up to 11 GeV per nucleon. Two modes of operation are foreseen, collider mode and extracted beams, with two detectors: MPD and BM@N. The both experiments are in preparation stage. An average luminosity in the collider mode is expected to be 1027 cm-2 s-1 for Au (79+). Extracted beams of various nuclei with maximum momenta of 13 GeV/c (for protons) will be available. A study of spin physics with extracted and colliding beams of polarized deuterons and protons at energies up to 27 GeV (for protons) is foreseen with the NICA facility. The proposed program allows one to search for possible signs of phase transitions and critical phenomena as well as to shed light on the problem of the nucleon spin structure.
2018-04-03
The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved to the entrance of the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
2018-04-03
The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is being prepared for the move to the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
TESS SpaceX Payload Fairing Move to PHSF
2018-04-03
The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved to the entrance of the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.
DOT National Transportation Integrated Search
2017-02-01
The authors reviewed the literature on planning intermodal transit facilities, extracting recommendations about station and station-area design and land uses, operation of transportation services, and policy actions for station-area planning. They al...
76 FR 1213 - Core Principles and Other Requirements for Swap Execution Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-07
... Part II Commodity Futures Trading Commission 17 CFR Part 37 Core Principles and Other Requirements... RIN Number 3038-AD18 Core Principles and Other Requirements for Swap Execution Facilities AGENCY... Compliance With the Core Principles III. Effective Date and Transition Period IV. Related Matters A...