Sample records for facility work plan

  1. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  2. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  3. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  4. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  5. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  6. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  7. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  8. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  9. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    ERIC Educational Resources Information Center

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  10. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  11. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  12. Guidance for Preparing a Facility Plan. Revised Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)

  13. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  14. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  15. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  16. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  17. School Facilities Planning. Research Report Number 1974-2.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…

  18. VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    CONRAD, M.J.; VALENTINE, I.E.

    IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…

  19. Disaster Preparedness Planning and Facility Contingency Operations for Public Works

    DTIC Science & Technology

    1993-01-01

    Forces Reporting Disaster Preparedness and Logistical Support 20-37 General Concept Manpower Planning, Protection and Support Personal Protection...their military mission, economical importance, geographical location, and personal and public safety. The organization, preparedness plans and facility...for emergency medical support). (5) Issue personal protective gear and equipment, if necessary. (6) Determine existi- g contract outcome. All

  20. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a... ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions... a schedule the State accepts and such schedule is inserted as a special condition of the grant...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.« less

  2. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  3. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  4. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  5. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  6. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  7. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of state-wide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmentalmore » Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]), approximately 400 ft east of the former CCC/USDA facility. Carbon tetrachloride concentrations in the Morgan well have ranged from the initial value of 29 {micro}g/L in 1998, up to a maximum of 61 {micro}g/L in 1999, and back down to 22 {micro}g/L in 2005. The carbon tetrachloride concentration in the MoDOT well in 2000 (the only time it was sampled) was 321 {micro}g/L. The concentrations for the two wells are above the EPA maximum contaminant level (MCL) of 5 {micro}g/L for carbon tetrachloride (EPA 1999; MoDNR 2000a,b). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based grain fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the health and environmental threats potentially posed by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by Argonne for all investigations at former CCC/USDA grain storage facilities in Missouri. Both the PMWP and this site-specific Work Plan must therefore be consulted for a complete description of the planned Phase I work at the former CCC/USDA facility at Savannah.« less

  8. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  9. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  10. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  11. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  12. 40 CFR 35.917-7 - State review and certification of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false State review and certification of facilities plan. 35.917-7 Section 35.917-7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works...

  13. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Submission and approval of facilities plan. 35.917-8 Section 35.917-8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  14. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Revision or amendment of facilities plan. 35.917-9 Section 35.917-9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  15. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  16. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  17. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also containsmore » 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.« less

  20. 30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3859-46, Y&D Drawing 190833. Scales 1' = 50' and 1' = 10'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  1. Elevation of water table and various stratigraphic surfaces beneath e area low level waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bagwell, Laura; Bennett, Patti

    2017-11-02

    This memorandum describes work that supports revision of the Radiological Performance Assessment (PA) for the E Area Low Level Radioactive Waste Disposal Facility (LLRWDF). The work summarized here addresses portions of the PA Strategic Planning Team's recommendation #148b (Butcher and Phifer, 2016).

  2. Astrophysics at RIA (ARIA) Working Group

    NASA Astrophysics Data System (ADS)

    Smith, Michael S.; Schatz, Hendrik; Timmes, Frank X.; Wiescher, Michael; Greife, Uwe

    2006-07-01

    The Astrophysics at RIA (ARIA) Working Group has been established to develop and promote the nuclear astrophysics research anticipated at the Rare Isotope Accelerator (RIA). RIA is a proposed next-generation nuclear science facility in the U.S. that will enable significant progress in studies of core collapse supernovae, thermonuclear supernovae, X-ray bursts, novae, and other astrophysical sites. Many of the topics addressed by the Working Group are relevant for the RIKEN RI Beam Factory, the planned GSI-Fair facility, and other advanced radioactive beam facilities.

  3. Integrated Facilities and Infrastructure Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reisz Westlund, Jennifer Jill

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less

  4. FINAL REPORT FOR THE REDUCTION OF CHROME (VI) TO CHROME (III) IN THE SECONDARY WASTE STREAM OF THE EFFLUENT TREATMENT FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN JB; GUTHRIE MD

    2008-08-29

    This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.

  5. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  6. Numerical Simulation of Ground Coupling of Low Yield Nuclear Detonation

    DTIC Science & Technology

    2010-06-01

    Without nuclear testing, advanced simulation and experimental facilities, such as the National Ignition Facility ( NIF ), are essential to assuring...in planning future experimental work at NIF . 15. NUMBER OF PAGES 93 14. SUBJECT TERMS National Ignition Facility, GEODYN, Ground Coupling...simulation and experimental facilities, such as the National Ignition Facility ( NIF ), are essential to assuring safety, reliability, and effectiveness

  7. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi westmore » of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.« less

  8. PLANNING AND COORDINATION OF ACTIVITIES SUPPORTING THE RUSSIAN SYSTEM OF CONTROL AND ACCOUNTING OF NUCLEAR MATERIALS AT ROSATOM FACILITIES IN THE FRAMEWORK OF THE U.S.-RUSSIAN COOPERATION.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SVIRIDOVA, V.V.; ERASTOV, V.V.; ISAEV, N.V.

    2005-05-16

    The MC&A Equipment and Methodological Support Strategic Plan (MEMS SP) for implementing modern MC&A equipment and methodologies at Rosatom facilities has been developed within the framework of the U.S.-Russian MPC&A Program. This plan developed by the Rosatom's Russian MC&A Equipment and Methodologies (MEM) Working Group and is coordinated by that group with support and coordination provided by the MC&A Measurements Project, Office of National Infrastructure and Sustainability, US DOE. Implementation of different tasks of the MEMS Strategic Plan is coordinated by Rosatom and US-DOE in cooperation with different U.S.-Russian MC&A-related working groups and joint site project teams. This cooperation allowsmore » to obtain and analyze information about problems, current needs and successes at Rosatom facilities and facilitates solution of the problems, satisfying the facilities' needs and effective exchange of expertise and lessons learned. The objective of the MEMS Strategic Plan is to enhance effectiveness of activities implementing modern equipment and methodologies in the Russian State MC&A system. These activities are conducted within the joint Russian-US MPC&A program aiming at reduction of possibility for theft or diversion of nuclear materials and enhancement of control of nuclear materials.« less

  9. Library Automation and Facility Planning.

    ERIC Educational Resources Information Center

    Cohen, Aaron; Cohen, Elaine

    This seminar and workbook are designed to aid librarians in planning and designing attractive and efficient libraries in light of the changing technologies of the 1980s. It is based on the premise that the electronic revolution of the 1980s will cause substantial changes in the work force, work processes, and the nature of physical layouts of…

  10. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In January 2000, carbon tetrachloride was detected in a soil sample (220 {micro}g/kg) and two soil gas samples (58 {micro}g/m{sup 3} and 550 {micro}g/m{sup 3}) collected at the former CCC/USDA facility, as a result of a pre-CERCLIS sitemore » screening investigation (SSI) performed by TN & Associates, Inc., on behalf of the U.S. Environmental Protection Agency (EPA), Region VII (MoDNR 2001). In June 2001, the Missouri Department of Natural Resources (MoDNR) conducted further sampling of the soils and groundwater at the former CCC/USDA facility as part of a preliminary assessment/site inspection (PA/SI). The MoDNR confirmed the presence of carbon tetrachloride (at a maximum identified concentration of 2,810 {micro}g/kg) and chloroform (maximum 82 {micro}g/kg) in the soils and also detected carbon tetrachloride and chloroform (42.2 {micro}g/L and 58.4 {micro}g/L, respectively) in a groundwater sample collected at the former facility (MoDNR 2001). The carbon tetrachloride levels identified in the soils and groundwater are above the default target level (DTL) values established by the MoDNR for this contaminant in soils of all types (79.6 {micro}g/kg) and in groundwater (5.0 {micro}g/L), as outlined in Missouri Risk-Based Corrective Action (MRBCA): Departmental Technical Guidance (MoDNR 2006a). The corresponding MRBCA DTL values for chloroform are 76.6 {micro}g/kg in soils of all types and 80 {micro}g/L in groundwater. Because the observed contamination at Montgomery City might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by Argonne for all investigations at former CCC/USDA grain storage facilities in Missouri. Both the PMWP and this site-specific Work Plan must therefore be consulted for a complete description of the planned Phase I work at the former CCC/USDA facility at Montgomery City.« less

  11. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  12. Availability analysis of an HTGR fuel recycle facility. Summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharmahd, J.N.

    1979-11-01

    An availability analysis of reprocessing systems in a high-temperature gas-cooled reactor (HTGR) fuel recycle facility was completed. This report summarizes work done to date to define and determine reprocessing system availability for a previously planned HTGR recycle reference facility (HRRF). Schedules and procedures for further work during reprocessing development and for HRRF design and construction are proposed in this report. Probable failure rates, transfer times, and repair times are estimated for major system components. Unscheduled down times are summarized.

  13. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  14. PLANNING AN ART ROOM.

    ERIC Educational Resources Information Center

    KROEGER, GARY

    THIS GUIDE IS INTENDED TO PROVIDE SUGGESTIONS IN PLANNING ART FACILITIES FOR ELEMENTARY AND SECONDARY SCHOOLS. AREAS PROVIDED FOR ARE (1) DRAWING AND PAINTING, (2) GRAPHIC ARTS, (3) GENERAL CRAFTS, (4) MODELING, AND (5) SCULPTURING. WORK CENTERS CAN BE PLANNED IN RELATION TO TRAFFIC FLOW. AT JUNIOR HIGH LEVEL, 24 STUDENTS ARE BEST ACCOMMODATED FOR…

  15. FInal Report: Site Investigation Results, 2009-2011, at Inman, Kansas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented bymore » the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified in 1998 by the KDHE within 1 mi of the town. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA agreed to conduct investigations at Inman. The investigations were performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. Argonne, on behalf of the CCC/USDA, developed a Work Plan (Argonne 2007) and subsequently a Summary of Investigation Results and Proposed Work Plan (Appendix A) for a phased site investigation. The proposed work was approved by the KDHE (2007, 2011). The investigations were conducted from November 2009 to September 2011, as proposed in the two work plans. This report presents the findings of the 2009-2011 investigations at Inman.« less

  16. Integration of bicycling and walking facilities into the infrastructure of urban communities.

    DOT National Transportation Integrated Search

    2012-02-01

    Several manuals, handbooks and web resources exist to provide varied guidance on planning for and designing bicycle and pedestrian facilities, yet there are no specific indications about which of the varied treatments in these guides work well for us...

  17. Integration of Bicycling and Walking Facilities into the Infrastructure of Urban Communities

    DOT National Transportation Integrated Search

    2012-02-01

    Several manuals, handbooks and web resources exist to provide varied guidance on planning for and designing bicycle and pedestrian facilities, yet there are no specific indications about which of the varied treatments in these guides work well for us...

  18. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  19. Planning crops and developing propagation protocols [Chapter 3

    Treesearch

    Douglass F. Jacobs; Kim M. Wilkinson

    2009-01-01

    Crop planning is an important but often neglected aspect of successful nursery management. Crop planning enables proper scheduling of the necessary time, materials, labor, and space to produce crops. Many painstaking details, such as the careful design of nursery facilities; working with clients; collecting and propagating seeds and cuttings; and making improvements in...

  20. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  1. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  2. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  3. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  4. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  5. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  6. A Model for a Level II Emergency Room

    DTIC Science & Technology

    1989-05-02

    the financial resources which will be consumed, and the Z inm chanQes in the way work will be accomplished. Health care facilities, in general...pursued with the anticipation of action results rather than an academic exercise. The planning process in a health care facility must work within the...Malcolm Grow USAF Medical Center of sufficient size and efficient functional configuration to provide a comprehensive and cost effective range health

  7. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... plans for the programs to be conducted by each cooperating and participating university or college and... colleges and universities, as appropriate, in meeting with high priority extension and research needs of... income opportunities, improving quality of life, improving essential community services and facilities...

  8. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... plans for the programs to be conducted by each cooperating and participating university or college and... colleges and universities, as appropriate, in meeting with high priority extension and research needs of... income opportunities, improving quality of life, improving essential community services and facilities...

  9. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... plans for the programs to be conducted by each cooperating and participating university or college and... colleges and universities, as appropriate, in meeting with high priority extension and research needs of... income opportunities, improving quality of life, improving essential community services and facilities...

  10. 76 FR 39918 - Honeywell International, Inc., Metropolis Works; License Amendment Request and Request for a Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ...., Metropolis Works; License Amendment Request and Request for a Hearing AGENCY: Nuclear Regulatory Commission... surface impoundment decommissioning plan at its Metropolis Works Facility site located in Metropolis... information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the...

  11. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  12. The space shuttle payload planning working groups. Volume 10: Space technology

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  13. Transuranic Waste Test Facility Development Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looper, M.G.

    1987-05-05

    This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less

  14. N Reactor Deactivation Program Plan. Revision 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less

  15. JPL Facilities and Software for Collaborative Design: 1994 - Present

    NASA Technical Reports Server (NTRS)

    DeFlorio, Paul A.

    2004-01-01

    The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

  16. 40 CFR 35.2214 - Grantee responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responsibilities. (a) The grantee shall complete the project in accordance with the grant agreement including: The facilities plan that establishes the need for the project; the design drawings and specifications; the plan... treatment works; the project schedule; and all other applicable regulations. The grantee shall maintain and...

  17. The Educator's "Action" Office.

    ERIC Educational Resources Information Center

    Martin, Dikran J.

    Design criteria, standards, and human factors related to designing and planning flexible and efficient work environments for college faculty members are overviewed with six model (example) office plans included. The physical and psychological design needs in such an office facility are given, with task performance data on student faculty…

  18. Building a secondary containment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Broder, M.F.

    1994-10-01

    Retail fertilizer and pesticide dealers across the United States are installing secondary containment at their facilities or are seriously considering it. Much of this work is in response to new state regulations; however, many dealers not facing new regulations are upgrading their facilities to reduce their liability, lower their insurance costs, or comply with anticipated regulations. The Tennessee Valley Authority`s (TVA) National Fertilizer and Environmental Research Center (NFERC) has assisted dealers in 22 states in retrofitting containment to their facilities. Simultaneous improvements in the operational efficiency of the facilities have been achieved at many of the sites. This paper ismore » based on experience gained in that work and details the rationale used in planning secondary containment and facility modifications.« less

  19. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix E: Work breakdown structure and dictionary

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    A work breakdown structure for the Space Station Life Sciences Research Facility (LSRF) is presented up to level 5. The purpose is to provide the framework for task planning and control and to serve as a basis for budgeting, task assignment, cost collection and report, and contractual performance measurement and tracking of the Full Scale Development Phase tasks.

  20. City of Chicago Combined Work Plan and Summary Report for Loewenthal Metals

    EPA Pesticide Factsheets

    Summary of the work performed by the City’s Department of Fleet and Facility Management on behalf of the Chicago Department of Transportation (CDOT) to address elevated levels of lead in City right of way..

  1. Achieving Healthy School Siting and Planning Policies: Understanding Shared Concerns of Environmental Planners, Public Health Professionals, and Educators

    PubMed Central

    Cohen, Alison

    2013-01-01

    Policy decisions regarding the quality of the physical school environment—both, school siting and school facility planning policies—are often considered through the lens of environmental planning, public health, or education policy, but rarely through all three. Environmental planners consider environmental justice issues on a local level and/or consider the regional impact of a school. Public health professionals focus on toxic exposures and populations particularly vulnerable to negative health outcomes. Educators and education policymakers emphasize investing in human capital of both students and staff. By understanding these respective angles and combining these efforts around the common goals of achieving adequacy and excellence, we can work towards a regulatory system for school facilities that recognizes children as a uniquely vulnerable population and seeks to create healthier school environments in which children can learn and adults can work. PMID:20359991

  2. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  3. A Phenomenological Study of the Work Environment in Long-Term Care Facilities for the Older Adults.

    PubMed

    Choi, Sandy Pin Pin; Yeung, Cheryl Chi Yan; Lee, Joseph Kok Long

    2018-05-01

    Attempts to meet the increasing demand for long-term care (LTC) services have been hindered by acute staff shortages and high turnover. Distinct from previous studies, a descriptive phenomenological approach with van Kaam's controlled explication method was adopted in this study, to delineate how attributes of the LTC work environment shape the workforce crisis. Individual interviews were conducted with 40 LTC workers from 10 facilities in Hong Kong. The results suggest that the work environment in LTC facilities is not only characterized by organization- and job-related attributes that influence staff outcomes but also is a socially constructed concept with derogatory connotations that can influence staff recruitment and retention. Concerted efforts from facility administrators and policy makers are needed to improve the quality of the work environment. Future initiatives should focus on developing a vision and strategic plan to facilitate the rise of the LTC sector as a profession.

  4. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  5. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  6. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  7. National Ignition Facility, High-Energy-Density and Inertial Confinement Fusion, Peer-Review Panel (PRP) Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keane, C. J.

    2014-01-28

    The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is operated as a National Nuclear Security Administration (NNSA) user facility in accordance with Department of Energy (DOE) best practices, including peer-reviewed experiments, regular external reviews of performance, and the use of a management structure that facilitates user and stakeholder feedback. NIF facility time is managed using processes similar to those in other DOE science facilities and is tailored to meet the mix of missions and customers that NIF supports. The NIF Governance Plan describes the process for allocating facility time on NIF and for creating the shot schedule.more » It also includes the flow of responsibility from entity to entity. The plan works to ensure that NIF meets its mission goals using the principles of scientific peer review, including transparency and cooperation among the sponsor, the NIF staff, and the various user communities. The NIF Governance Plan, dated September 28, 2012, was accepted and signed by LLNL Director Parney Albright, NIF Director Ed Moses, and Don Cook and Thomas D’Agostino of NNSA. Figure 1 shows the organizational structure for NIF Governance.« less

  8. Edward W. Jennings | NREL

    Science.gov Websites

    practices promoting a safe and supportive working environment. His research interests include environmental, safety, and health (ESH) and facility issues, he is responsible for implementing safe work plan; working directly with awardees by performing on-site validations to collect and analyze enzyme

  9. Virtual Facility at Fermilab: Infrastructure and Services Expand to Public Clouds

    DOE PAGES

    Timm, Steve; Garzoglio, Gabriele; Cooper, Glenn; ...

    2016-02-18

    In preparation for its new Virtual Facility Project, Fermilab has launched a program of work to determine the requirements for running a computation facility on-site, in public clouds, or a combination of both. This program builds on the work we have done to successfully run experimental workflows of 1000-VM scale both on an on-site private cloud and on Amazon AWS. To do this at scale we deployed dynamically launched and discovered caching services on the cloud. We are now testing the deployment of more complicated services on Amazon AWS using native load balancing and auto scaling features they provide. Themore » Virtual Facility Project will design and develop a facility including infrastructure and services that can live on the site of Fermilab, off-site, or a combination of both. We expect to need this capacity to meet the peak computing requirements in the future. The Virtual Facility is intended to provision resources on the public cloud on behalf of the facility as a whole instead of having each experiment or Virtual Organization do it on their own. We will describe the policy aspects of a distributed Virtual Facility, the requirements, and plans to make a detailed comparison of the relative cost of the public and private clouds. Furthermore, this talk will present the details of the technical mechanisms we have developed to date, and the plans currently taking shape for a Virtual Facility at Fermilab.« less

  10. Virtual Facility at Fermilab: Infrastructure and Services Expand to Public Clouds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Timm, Steve; Garzoglio, Gabriele; Cooper, Glenn

    In preparation for its new Virtual Facility Project, Fermilab has launched a program of work to determine the requirements for running a computation facility on-site, in public clouds, or a combination of both. This program builds on the work we have done to successfully run experimental workflows of 1000-VM scale both on an on-site private cloud and on Amazon AWS. To do this at scale we deployed dynamically launched and discovered caching services on the cloud. We are now testing the deployment of more complicated services on Amazon AWS using native load balancing and auto scaling features they provide. Themore » Virtual Facility Project will design and develop a facility including infrastructure and services that can live on the site of Fermilab, off-site, or a combination of both. We expect to need this capacity to meet the peak computing requirements in the future. The Virtual Facility is intended to provision resources on the public cloud on behalf of the facility as a whole instead of having each experiment or Virtual Organization do it on their own. We will describe the policy aspects of a distributed Virtual Facility, the requirements, and plans to make a detailed comparison of the relative cost of the public and private clouds. Furthermore, this talk will present the details of the technical mechanisms we have developed to date, and the plans currently taking shape for a Virtual Facility at Fermilab.« less

  11. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. The planned Alaska SAR Facility - An overview

    NASA Technical Reports Server (NTRS)

    Carsey, Frank; Weeks, Wilford

    1987-01-01

    The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.

  13. Paying for Itself

    ERIC Educational Resources Information Center

    Wilkinson, Ron

    2009-01-01

    Many schools and universities want the U.S. Green Building Council's LEED certification for their facilities, but they are concerned about cost. This certification is tangible evidence that a facility is designed to conserve resources and use energy more efficiently. "Low-cost/no-cost" upgrades can be worked into a capital plan that provides a 3-…

  14. Renovating existing space to meet special needs for outpatient paediatric oncology.

    PubMed

    Rhodes, D A

    1999-01-01

    Many existing hospital buildings are inadequate to meet needs caused by a tremendous shift from inpatient to outpatient care. Expensive diagnostic and treatment facilities must still be shared by inpatients and outpatients, which in many cases makes renovations to existing facilities on site more appealing than new free-standing facilities; However, care must be taken in the planning and design to make sure that existing hospital operations can be maintained throughout this work. St. Jude Children's Research Hospital in Memphis, an internationally acclaimed institution devoted to the research and treatment of catastrophic illnesses in children has experienced a large growth in its outpatients' care due mainly to changes in treatment modalities and the development of more effective cures. The result has been an extreme overcrowding and unpleasant experiences for patient and family due to awkward patient flow and work processes attempting to respond to the inadequate facility conditions. This paper will not only review the planning issues, but will discuss the renovation which will require several phases in order to minimise disruption to the ongoing activities.

  15. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...

  16. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  17. Short-Term Operations Plan for Collection of Bulk Quantity CBP Liquid in Support of a Pilot-Scale Treatabilty Evaluation with Water Recovery Inc

    EPA Pesticide Factsheets

    June 3, 2011 work plan for a pilot-scale treatability evaluation with a commercial wastewater treatment facility, Water Recovery Inc. (WRI) located in Jacksonville, Florida. Region ID: 04 DocID: 10749927, DocDate: 06-03-2011

  18. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...

  19. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less

  20. Work Plan: Phase II Investigation at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M

    From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities.

  1. Facilities Maintenance in the U.S. Navy

    DTIC Science & Technology

    1986-01-01

    Row’a9IVI s..Nl,I I~de 14. 11111116104 It. safeI MeAI. 5,124 AN (:lgnd) JOHN SMITH I765 IIf Figure 111-1 Work Request is EMIROENCY/SERVICE WORK...Eliminate fire, health and active life of less than 3 years safety hazards o Infrequently or only partially o Patch and reinforce instead used of...safety or health hazards and to permit reactivation within the period prescribed under mobili- zation plans o Surplus facilities a Fliminate fire, safety

  2. Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowes, Elizabeth A.

    2012-07-01

    Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operationsmore » at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)« less

  3. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  4. The 10 MWe solar thermal central receiver pilot plant solar facilities design integration, RADL item 1-10

    NASA Astrophysics Data System (ADS)

    1980-07-01

    Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)

  5. Lewis and Clark Elementary School Riverview Gardens School District, St. Louis, Missouri. Profile of a Significant School.

    ERIC Educational Resources Information Center

    Gilliland, John W.

    Development of a design for a new elementary school facility is traced through evaluation of various innovative facilities. Significant features include--(1) the spiral plan form, (2) centralized core levels including teacher work center, "perception" core, and interior stream aquariam, (3) the learning laboratory classroom suites, (4) a unique…

  6. Multiple Use. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.

    Examined is the use of wastewater treatment facilities for recreation, education, and open space. Objectives of the learning session described in this instructor's manual are to: (1) introduce opportunities for multiple use, (2) identify areas for citizen input in facility planning and design, and (3) provide criteria for determining local needs…

  7. 41 CFR 102-71.20 - What definitions apply to GSA's real property policies?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...

  8. 41 CFR 102-71.20 - What definitions apply to GSA's real property policies?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...

  9. Modernizing an ambulatory care pharmacy in a large multi-clinic institution.

    PubMed

    Miller, R F; Herrick, J D

    1979-03-01

    The steps involved in modernizing an outdated outpatient pharmacy, including the functional planning process, development of a work-flow pattern which makes the patient an integral part of the system, budget considerations and evaluation of the new pharmacy, are described. Objectives of the modernization were to: (1) provide a facility conductive to efficient and high quality services to the ambulatory patient; (2) provide an attractive and comfortable area for patients and staff; (3) provide a work flow which keeps the patient in the system and allows the pharmacist time for instruction and patient education; and (4) establish a patient medication record system. After one year of operation, average overall prescription volume increased by 50%, while average waiting time declined by 74%. Facility and procedural changes allowed the pharmacist to substantially increase patient counseling activity. The application of functional planning and facility design to the renovation and restructuring of an outpatient pharmacy allowed pharmacists to provide efficient, patient-oriented service.

  10. National facilities study. Volume 5: Space research and development facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

  11. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  12. When the library is located in prime real estate: a case study on the loss of space from the Duke University Medical Center Library and Archives.

    PubMed

    Thibodeau, Patricia L

    2010-01-01

    The Duke University Medical Center Library and Archives is located in the heart of the Duke Medicine campus, surrounded by Duke Hospital, ambulatory clinics, and numerous research facilities. Its location is considered prime real estate, given its adjacency to patient care, research, and educational activities. In 2005, the Duke University Library Space Planning Committee had recommended creating a learning center in the library that would support a variety of educational activities. However, the health system needed to convert the library's top floor into office space to make way for expansion of the hospital and cancer center. The library had only five months to plan the storage and consolidation of its journal and book collections, while working with the facilities design office and architect on the replacement of key user spaces on the top floor. Library staff worked together to develop plans for storing, weeding, and consolidating the collections and provided input into renovation plans for users spaces on its mezzanine level. The library lost 15,238 square feet (29%) of its net assignable square footage and a total of 16,897 (30%) gross square feet. This included 50% of the total space allotted to collections and over 15% of user spaces. The top-floor space now houses offices for Duke Medicine oncology faculty and staff. By storing a large portion of its collection off-site, the library was able to remove more stacks on the remaining stack level and convert them to user spaces, a long-term goal for the library. Additional space on the mezzanine level had to be converted to replace lost study and conference room spaces. While this project did not match the recommended space plans for the library, it underscored the need for the library to think creatively about the future of its facility and to work toward a more cohesive master plan.

  13. Timing Is Everything.

    ERIC Educational Resources Information Center

    Brunner, Patrick M.; Shelley, Kevin D.

    2001-01-01

    In school construction projects a great deal of work and planning needs to happen before ground breaking starts. Lists consistent factors that should always be considered when setting up a facility-design timeline. (MLF)

  14. Implementation of the TsunamiReady Supporter Program in Puerto Rico

    NASA Astrophysics Data System (ADS)

    Flores Hots, V. E.; Vanacore, E. A.; Gonzalez Ruiz, W.; Gomez, G.

    2016-12-01

    The Puerto Rico Seismic Network (PRSN) manages the PR Tsunami Program (NTHMP), including the TsunamiReady Supporter Program. Through this program the PRSN helps private organizations, businesses, facilities or local government entities to willingly engage in tsunami planning and preparedness that meet some requirements established by the National Weather Service. TsunamiReady Supporter organizations are better prepared to respond to a tsunami emergency, developing a response plan (using a template that PRSN developed and provides), and reinforcing their communication systems including NOAA radio, RSS, and loud speakers to receive and disseminate the alerts issued by the NWS and the Tsunami Warning Centers (TWC). The planning and the communication systems added to the training that PRSN provides to the staff and employees, are intend to help visitors and employees evacuate the tsunami hazard zone to the nearest assembly point minimizing loss of life. Potential TsunamiReady Supporters include, but are not limited to, businesses, schools, churches, hospitals, malls, utilities, museums, beaches, and harbors. However, the traditional targets for such programs are primarily tourism sites and hotels where people unaware of the tsunami hazard may be present. In 2016 the Tsunami Ready Program guided four businesses to achieve the TsunamiReady Supporter recognition. Two facilities were hotels near or inside the evacuation zone. The other facilities were the first and only health center and supermarket to be recognized in the United States and US territories. Based on the experience of preparing the health center and supermarket sites, here we present two case studies of how the TsunamiReady Supporter Program can be applied to non-traditional facilities as well as how the application of this program to such facilities can improve tsunami hazard mitigation. Currently, we are working on expanding the application of this program to non-traditional facilities by working with a banking facility located in a tsunami evacuation zone increasing their capacity to manage a tsunami event and to reinforce the entity's involvement in developing a plan for their clients and employees to evacuate the area and head to a safe place.

  15. SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipriani, Ralph J.

    2014-12-01

    Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

  16. Solidification under zero gravity: A Long Duration Exposure Facility (LDEF) experiment for an early space shuttle mission. [project planning

    NASA Technical Reports Server (NTRS)

    Bailey, J. A.

    1976-01-01

    Project planning for two series of simple experiments on the effect of zero gravity on the melting and freezing of metals and nonmetals is described. The experiments will be performed in the Long Duration Exposure Facility, and their purpose will be to study: (1) the general morphology of metals and nonmetals during solidification, (2) the location of ullage space (liquid-vapor interfaces), and (3) the magnitude of surface tension driven convection during solidification of metals and nonmetals. The preliminary design of the experiments is presented. Details of the investigative approach, experimental procedure, experimental hardware, data reduction and analysis, and anticipated results are given. In addition a work plan and cost analysis are provided.

  17. D.C. Public School and Public Charter School Capital Budgeting: Task 3 Report

    ERIC Educational Resources Information Center

    Filardo, Mary; Rivlin, Alice M.; O'Cleireacain, Carol; Garrison, David

    2005-01-01

    The District of Columbia is four years into the implementation of a ten year Educational Facility Master Plan and seven years into the development of Public Charter Schools. A great deal of work to improve public school facilities has been done. The new buildings and renovations that have been completed by the District of Columbia Public Schools…

  18. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  19. Experiments, conceptual design, preliminary cost estimates and schedules for an underground research facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Korbin, G.; Wollenberg, H.; Wilson, C.

    Plans for an underground research facility are presented, incorporating techniques to assess the hydrological and thermomechanical response of a rock mass to the introduction and long-term isolation of radioactive waste, and to assess the effects of excavation on the hydrologic integrity of a repository and its subsequent backfill, plugging, and sealing. The project is designed to utilize existing mine or civil works for access to experimental areas and is estimated to last 8 years at a total cost for contruction and operation of $39.0 million (1981 dollars). Performing the same experiments in an existing underground research facility would reduce themore » duration to 7-1/2 years and cost $27.7 million as a lower-bound estimate. These preliminary plans and estimates should be revised after specific sites are identified which would accommodate the facility.« less

  20. 78 FR 66911 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... mining of coal. The Commission will use this EA in its decision-making process to determine whether the... work to be performed for the planned longwall coal mining activities of Emerald Coal Resources, LP... pipeline facilities at their certificated design capacities during the planned longwall mining activities...

  1. Performance related specifications for hydraulic cement concrete used in construction and rehabilitation of ground transportation facilities.

    DOT National Transportation Integrated Search

    1982-01-01

    This report summarizes the work performed on the subject study from June through September 1982. In accordance with the revised work plan for Task 4 of the project approved May 24, 1982, the new completion date for the project is April 30, 1983.

  2. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  3. Astrophysics at the future Rare Isotope Accelerator

    NASA Astrophysics Data System (ADS)

    Smith, Michael; Schatz, Hendrik; Timmes, Frank X.; Wiescher, Michael; Greife, Uwe

    PoS(NIC-IX)179 Significant progress in studies of core collapse supernovae, thermonuclear supernovae, X-ray bursts, novae, and other astrophysical phenomena require intense beams of a wide range of unsta- ble nuclei. While some such beams are currently available and being used for important studies in nuclear astrophysics, the beams are often insufficient in intensity, purity, or available isotopes. It is anticipated that a next-generation radioactive beam facility will be built in the U.S. in the next decade to address these shortcomings, and a Working Group has been established to develop and promote nuclear astrophysics research at this new facility. Many of the topics addressed by the Working Group are relevant for the RIKEN RI Beam Factory, the planned GSI-Fair facility, and other advanced radioactive beam facilities around the world.

  4. Strengthening TB infection control in specialized health facilities in Romania--using a participatory approach.

    PubMed

    Turusbekova, N; Popa, C; Dragos, M; van der Werf, M J; Dinca, I

    2016-02-01

    In 2012, the tuberculosis (TB) notification rate among Romanian TB facility doctors and nurses was 7.2 times higher than in the general population. This indicates that transmission is ongoing inside TB facilities and that TB infection control measures are insufficient. To help prevent nosocomial TB transmission a project was implemented that aimed at providing nationwide tailor-made technical assistance in TB infection control (TB-IC) in TB treatment facilities, including the development of TB infection control plans. The objective of the present article is to describe the implementation of the project and to discuss successes and challenges. The project was an implementation study using two methods of evaluation: (1) a cross sectional questionnaire study; and (2) collection of information, during the training, on challenges related to infection control and to the project implementation. The project team developed a TB facility infection control (TB-IC) plan template, together with the Romanian experts. The template was discussed and agreed upon with the experts at a meeting and thereafter distributed by email to all TB facilities. Afterwards, a training of trainers (TOT) seminar was organized which included the provision of information about different training methods, as well as information about TB-IC. The TOT was followed by training for key TB-IC providers. Information about use of the TB-IC template was gathered through a self-administered questionnaire sent to all participants of the expert meeting and the training (42 people). Additionally, non-systematized discussions were held on broader challenges in TB-IC implementation during the training. Within the project 42 key TB-IC service providers were trained in TB-IC, including 9 who were trained at a TOT seminar. The trainees were specialists working at the national level, such as country TB coordinators, or at the TB facility level: TB doctors, epidemiologists, laboratory specialists and maintenance engineers. Out of 42 key TB-IC service providers who were trained, only eighteen responded to the questionnaire (no reminders were sent). Out of these, 14 had used the TB-IC plan template after the project team disseminated it to them by email. The remaining four TB-IC service providers indicated that they were planning to use the template to develop or update their facility TB-IC plans. Related to the use of TB-IC plan template, the following broader challenges in TB-IC were identified: a lack of authority of the individuals responsible for TB-IC to implement the TB-IC measures, lack of training among facility epidemiologists on TB, underdeveloped system for reporting TB in healthcare workers, difficulties with triage of the TB suspects, and poor facility infrastructure hampering implementation of TB-IC measures. Implementing TB-IC plans in Romanian health care facilities proved to be challenging, mainly due to the fact that the national infection control plan for TB was not yet adopted at the time of project implementation, and therefore there was neither a regulatory framework to support TB facility-IC planning nor any related budget allocations for the implementation of the facilities' TB-IC plans. Nonetheless, most respondents who answered the questionnaire (18 of 42 responded) indicated that they had started using the TB-IC plan template, which represents a full package of infection control measures that, when implemented effectively and in its entirety, may be expected to reduce nosocomial transmission. The study's limitations are: very low survey response rate, thus there is a likelihood of responder bias. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  5. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  6. Georgia Institute of Technology chilled water system evaluation and master plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-15

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction inmore » the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.« less

  7. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  8. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  9. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  10. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  11. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  12. Educational and intervention strategies for improving a shift system: an experience in a disabled persons' facility.

    PubMed

    Sakai, K; Watanabe, A; Kogi, K

    1993-01-01

    The improvement of an irregular three-shift system with anti-clockwise rotation of workers of a disabled persons' facility covering 42 h a week was a subject for management-labour debate. Workers were complaining of physical fatigue, high prevalence of low back pain, sleep shortages associated with short inter-shift intervals, and irregular holidays. With the co-operation of trade union members, an educational and intervention programme was designed to analyse, plan, and implement improved shift rotation schemes. The programme consisted of (a) a group study on the existing system and effects on health and working life; (b) joint planning of potential schemes; (c) communication and feedback (d) testing and evaluation; and (e) agreement on an improved system. The group study was undertaken by means of time study, questionnaire and physiological methods, and the results were jointly discussed. This led to the planning of alternative shift schemes incorporating more regular, clockwise rotation. It was agreed to stage a trial period with a view to shorter working hours. This experience indicated the importance of a stepwise intervention strategy with frequent dialogues and a participatory process focusing on the broad range of working life and health issues.

  13. Provision of family planning services in Tanzania: a comparative analysis of public and private facilities.

    PubMed

    Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd

    2012-12-01

    Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.

  14. Hurricane risk mitigation - Emergency Operations Center

    NASA Image and Video Library

    2008-07-29

    Construction work on a new Emergency Operations Center at Stennis Space Center is nearing completion. Construction is expected to be complete by February 2009, with actual occupancy of the building planned for later that year. The new building will house fire, medical and security teams and will provide a top-grade facility to support storm emergency responder teams and emergency management operations for the south Mississippi facility.

  15. Accelerator Physics Working Group Summary

    NASA Astrophysics Data System (ADS)

    Li, D.; Uesugi, T.; Wildnerc, E.

    2010-03-01

    The Accelerator Physics Working Group addressed the worldwide R&D activities performed in support of future neutrino facilities. These studies cover R&D activities for Super Beam, Beta Beam and muon-based Neutrino Factory facilities. Beta Beam activities reported the important progress made, together with the research activity planned for the coming years. Discussion sessions were also organized jointly with other working groups in order to define common ground for the optimization of a future neutrino facility. Lessons learned from already operating neutrino facilities provide key information for the design of any future neutrino facility, and were also discussed in this meeting. Radiation damage, remote handling for equipment maintenance and exchange, and primary proton beam stability and monitoring were among the important subjects presented and discussed. Status reports for each of the facility subsystems were presented: proton drivers, targets, capture systems, and muon cooling and acceleration systems. The preferred scenario for each type of possible future facility was presented, together with the challenges and remaining issues. The baseline specification for the muon-based Neutrino Factory was reviewed and updated where required. This report will emphasize new results and ideas and discuss possible changes in the baseline scenarios of the facilities. A list of possible future steps is proposed that should be followed up at NuFact10.

  16. Radioactive Waste Management and Nuclear Facility Decommissioning Progress in Iraq - 13216

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Musawi, Fouad; Shamsaldin, Emad S.; Jasim, Hadi

    2013-07-01

    Management of Iraq's radioactive wastes and decommissioning of Iraq's former nuclear facilities are the responsibility of Iraq's Ministry of Science and Technology (MoST). The majority of Iraq's former nuclear facilities are in the Al-Tuwaitha Nuclear Research Center located a few kilometers from the edge of Baghdad. These facilities include bombed and partially destroyed research reactors, a fuel fabrication facility and radioisotope production facilities. Within these facilities are large numbers of silos, approximately 30 process or waste storage tanks and thousands of drums of uncharacterised radioactive waste. There are also former nuclear facilities/sites that are outside of Al-Tuwaitha and these includemore » the former uranium processing and waste storage facility at Jesira, the dump site near Adaya, the former centrifuge facility at Rashdiya and the former enrichment plant at Tarmiya. In 2005, Iraq lacked the infrastructure needed to decommission its nuclear facilities and manage its radioactive wastes. The lack of infrastructure included: (1) the lack of an organization responsible for decommissioning and radioactive waste management, (2) the lack of a storage facility for radioactive wastes, (3) the lack of professionals with experience in decommissioning and modern waste management practices, (4) the lack of laws and regulations governing decommissioning or radioactive waste management, (5) ongoing security concerns, and (6) limited availability of electricity and internet. Since its creation eight years ago, the MoST has worked with the international community and developed an organizational structure, trained staff, and made great progress in managing radioactive wastes and decommissioning Iraq's former nuclear facilities. This progress has been made, despite the very difficult implementing conditions in Iraq. Within MoST, the Radioactive Waste Treatment and Management Directorate (RWTMD) is responsible for waste management and the Iraqi Decommissioning Directorate (IDD) is responsible for decommissioning activities. The IDD and the RWTMD work together on decommissioning projects. The IDD has developed plans and has completed decommissioning of the GeoPilot Facility in Baghdad and the Active Metallurgical Testing Laboratory (LAMA) in Al-Tuwaitha. Given this experience, the IDD has initiated work on more dangerous facilities. Plans are being developed to characterize, decontaminate and decommission the Tamuz II Research Reactor. The Tammuz Reactor was destroyed by an Israeli air-strike in 1981 and the Tammuz II Reactor was destroyed during the First Gulf War in 1991. In addition to being responsible for managing the decommissioning wastes, the RWTMD is responsible for more than 950 disused sealed radioactive sources, contaminated debris from the first Gulf War and (approximately 900 tons) of naturally-occurring radioactive materials wastes from oil production in Iraq. The RWTMD has trained staff, rehabilitated the Building 39 Radioactive Waste Storage building, rehabilitated portions of the French-built Radioactive Waste Treatment Station, organized and secured thousands of drums of radioactive waste organized and secured the stores of disused sealed radioactive sources. Currently, the IDD and the RWTMD are finalizing plans for the decommissioning of the Tammuz II Research Reactor. (authors)« less

  17. Using Motion Planning to Determine the Existence of an Accessible Route in a CAD Environment

    ERIC Educational Resources Information Center

    Pan, Xiaoshan; Han, Charles S.; Law, Kincho H.

    2010-01-01

    We describe an algorithm based on motion-planning techniques to determine the existence of an accessible route through a facility for a wheeled mobility device. The algorithm is based on LaValle's work on rapidly exploring random trees and is enhanced to take into consideration the particularities of the accessible route domain. Specifically, the…

  18. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  19. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  20. 40 CFR Table 2 to Subpart Jjjjjj... - Work Practice Standards, Emission Reduction Measures, and Management Practices

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Pt. 63, Subpt... of available architectural and engineering plans, facility operation and maintenance procedures and...

  1. 40 CFR Table 2 to Subpart Jjjjjj... - Work Practice Standards, Emission Reduction Measures, and Management Practices

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Pt. 63, Subpt... of available architectural and engineering plans, facility operation and maintenance procedures and...

  2. Concept mapping to improve team work, team learning and care of the person with dementia and behavioural and psychological symptoms.

    PubMed

    Aberdeen, Suzanne M; Byrne, Graeme

    2018-04-01

    The incidence of behavioural and psychological symptoms of dementia in residential aged care facilities is high. Effective team work and knowledgeable staff are cited as important facilitators of appropriate care responses to clients with these symptoms, but to achieve this within a resource-poor workplace can be challenging. In the study reported in this paper, concept mapping was trialled to enhance multifocal person-centred assessment and care planning as well as team learning. The outcomes of team concept mapping were evaluated using a quasi-experimental design with pre- and post-testing in 11 selected Australian residential aged care facilities , including two control residential aged care facilities , over a nine-month period. It was demonstrated that use of concept mapping improved team function, measured as effectiveness of care planning, as well as enhancing learning, with increased knowledge of dementia care even amongst staff who were not directly involved with the process. It is suggested that these results may be generalizable to other countries and care settings.

  3. Suicidal behaviours in male and female users of illicit drugs recruited in drug treatment facilities.

    PubMed

    Arribas-Ibar, Elisabet; Suelves, Josep Maria; Sanchez-Niubò, Albert; Domingo-Salvany, Antònia; T Brugal, M

    We assessed prevalence of suicidal ideation and plans among illicit drug users and their association with contextual factors, by gender. Cross-sectional study. In a sample of 511 illicit drug users recruited during spring 2012 in drug treatment and prevention facilities in Catalonia (Spain), the prevalence of suicidal ideation/plans in the last 12 months was assessed. Poisson regression was used to examine associations between suicidal ideation/plans and various factors (socio-demographic, psychological, illegal drug market activities and marginal income generation activities, which included any reported sex work, stealing, peddling, begging or borrowing on credit from a dealer). The average age was 37.9 years (standard deviation: 8.62); 76.3% were men. Suicidal ideation/plans were reported by 30.8% of men and 38.8% of women, with no significant differences by age or gender. Recent aggression (male prevalence ratio [PR]=2.2; female PR=1.4), psychological treatment (male PR=1.2; female PR=1.3) and illegal/marginal income generation activities (male PR=1.5; female PR=1.1) were associated with suicidal ideation/plans. Men who trafficked were more likely to have suicidal ideation/plans (PR=1.3), while prison history was positive for women (PR=1.8) and negative for men (PR=0.7). Prevalence of suicidal ideation/plans was high among illicit drug users recruited from healthcare facilities. Besides psychological variables, participation in illegal market activities and crime ought to be considered in drug users' suicidal prevention. Suicide risk needs to be evaluated in drug treatment facilities and psychological status and context contemplated. Copyright © 2017 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  4. Application of demographic analysis to pedestrian safety : [project summary].

    DOT National Transportation Integrated Search

    2017-05-01

    FDOT has been working diligently to improve its facilities for pedestrians and cyclists, including : initiatives like the Complete Streets Policy and Implementation Plan. However, one of the : challenges facing FDOT is targeting those areas of greate...

  5. Breastfeeding works: the role of employers in supporting women who wish to breastfeed and work in four organizations in England.

    PubMed

    Kosmala-Anderson, Joanna; Wallace, Louise M

    2006-09-01

    An important factor influencing duration of breastfeeding is mother's employment status. The main aim of this study was to determine the experience and views of employees (n = 46) in four large public sector organizations concerning breastfeeding support at work. Participants were recruited if they were employed by one of four public service employers and if they were planning to go on maternity leave in the next 6 months, on maternity leave or within 6 months of return from maternity leave. They completed a questionnaire anonymously. Almost 80% of women wanted to continue breastfeeding after returning to work. However, 90% of all respondents were not aware of any employer policy nor offered any information concerning support to enable breastfeeding after returning to work, despite two organizations having a range of maternity- and breastfeeding-related policies in development and some facilities in place. Almost 90% of respondents stated the employers should do more to support breastfeeding. This should include providing pregnant staff with information about breastfeeding support that they should expect and could therefore plan to use, including access to facilities to express and to store breast milk, to enable them to work flexible hours and to take rest breaks during working hours. Recommendations are made for employers.

  6. New regulations for radiation protection for work involving radioactive fallout emitted by the TEPCO Fukushima Daiichi APP accident--disposal of contaminated soil and wastes.

    PubMed

    Yasui, Shojiro

    2014-01-01

    The accident at the Fukushima Daiichi Atomic Power Plant that accompanied the Great East Japan Earthquake on March 11, 2011, released a large amount of radioactive material. To rehabilitate the contaminated areas, the government of Japan decided to carry out decontamination work and manage the waste resulting from decontamination. In the summer of 2013, the Ministry of the Environment planned to begin a full-scale process for waste disposal of contaminated soil and wastes removed as part of the decontamination work. The existing regulations were not developed to address such a large amount of contaminated wastes. The Ministry of Health, Labour and Welfare (MHLW), therefore, had to amend the existing regulations for waste disposal workers. The amendment of the general regulation targeted the areas where the existing exposure situation overlaps the planned exposure situation. The MHLW established the demarcation lines between the two regulations to be applied in each situation. The amendment was also intended to establish provisions for the operation of waste disposal facilities that handle large amounts of contaminated materials. Deliberation concerning the regulation was conducted when the facilities were under design; hence, necessary adjustments should be made as needed during the operation of the facilities.

  7. KENNEDY SPACE CENTER, FLA. - Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo on their visit to the Spacehab facility in Cape Canaveral, Fla. They were awarded the trip when their experiments were chosen to fly on mission STS-107. The group was also meeting with American students from Melbourne and Jacksonville, Fla. The girls planned a floral tribute at the STS-107 memorial stone at the facility. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station and Payloads Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students’ visit.

    NASA Image and Video Library

    2003-08-20

    KENNEDY SPACE CENTER, FLA. - Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo on their visit to the Spacehab facility in Cape Canaveral, Fla. They were awarded the trip when their experiments were chosen to fly on mission STS-107. The group was also meeting with American students from Melbourne and Jacksonville, Fla. The girls planned a floral tribute at the STS-107 memorial stone at the facility. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station and Payloads Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students’ visit.

  8. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobsen, P.H.

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  9. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  10. Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Astronaut Charles D. (Sam) Gemar, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.

  11. Astronaut Pierre J. Thuot works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Astronaut Pierre J. Thuot, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.

  12. Perimeter security for Minnesota correctional facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crist, D.; Spencer, D.D.

    1996-12-31

    For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less

  13. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  14. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  15. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  16. Liquid secondary waste. Waste form formulation and qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Dixon, K. L.; Hill, K. A.

    The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during Site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilization Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the Integrated Disposal Facility IDF). Waste form testingmore » to support this plan is composed of work in the near term to demonstrate the waste form will provide data as input to a performance assessment (PA) for Hanford’s IDF.« less

  17. Research and the planned Space Experiment Research and Processing Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Original photo and caption dated October 8, 1991: 'Plant researchers Neil Yorio and Lisa Ruffe prepare to harvest a crop of Waldann's Green Lettuce from KSC's Biomass Production Chamber (BPC). KSC researchers have grown several different crops in the BPC to determine which plants will better produce food, water and oxygen on long-duration space missions.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.

  18. Research and the planned Space Experiment Research and Processing Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Original photo and caption dated October 8, 1991: 'Plant researchers Lisa Ruffe and Neil Yorio prepare to harvest a crop of Waldann's Green Lettuce from KSC's Biomass Production Chamber (BPC). KSC researchers have grown several different crops in the BPC to determine which plants will better produce food, water and oxygen on long-duration space missions.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.

  19. Rubbertown NGEM Demonstration Project Planning meetings ...

    EPA Pesticide Factsheets

    From the shared perspective of industrial facilities, workers, regulators, and communities, cost-effective detection and assessment of significant onset fugitive leaks or process issues, is a mutually beneficial concept. If emissions that require mitigation can be detected and fixed quickly, benefits such as safer working environments, cost saving through reduced product loss, lower air shed pollutant impacts, and improved transparency and community relations can be realized. Under its next generation emission measurement program (NGEM), EPA’s Office of Research and Development (ORD), National Risk Management Research Laboratory (NRMRL) is working collaboratively with industry, instrument /information companies, state and local agencies, communities, and academic groups to explore new technical approaches for non-point source detection and migration. Techniques such as mobile and fixed point sensors and passive samplers employed on various spatial scales are being explored. With collaboration of the project team including EPA R4, the Louisville Metro Air Pollution Control District (LMAPCD), industrial facilities, and contractors to the EPA, a select subset of these NGEM approaches will be demonstrated in this project as per the quality assurance project plan. From April 17-20, 2017, E. Thoma will travel to Louisville KY to work with the Louisville Metro Air Pollution Control District (LMAPCD) and other parties for planning activities related to the

  20. The next pandemic: anticipating an overwhelmed health care system.

    PubMed

    Duley, Mary Grace Keating

    2005-10-01

    In September 2005, an overview of current health care system planning efforts was presented to the audience at the Yale University Ethics Symposium on Avian and Pandemic Influenza. The speaker, also the author of this article, provided the audience with a summary of what was being undertaken with the use of federal preparedness funds to improve the overall infrastructure of the health care system. All of Connecticut's 31 acute care hospitals, the Veteran's Administration Hospital in West Haven, Hospital for Special Care, Gaylord Rehabilitation Hospital, Natchaug Psychiatric Hospital, and the state's 13 Community Health Centers are currently recipients of federal preparedness funds. Federal funding for this planning comes from Health Resources and Services Administration, Department of Health and Human Service's National Bioterrorism Hospital Preparedness Program. This article outlines the planning activities around pandemic influenza that the state's health care system partners started in 2004-2005 and also those they are currently participating in or will be participating in the next 12 to 15 months. The article highlights the key objectives and strategies that health care facilities will be using in this planning. There are four major objectives that each health care facility's Emergency Operations Plan must address. They are: increasing bed availability, developing strategies to deal with the potential staffing shortages, developing strategies for dealing with potential critical equipment and pharmaceutical shortages, and, lastly, the implementation of education, training and communication strategies for their health care workers and the public they serve. These plans, and all the activities needed to operationalize the plans, such as education, training, drills, and exercises, will include their key partners, i.e., local health departments, local emergency management, police, fire, and Emergency Medical Services. This article will describe this work plan in detail. Descriptive information was obtained through the author's observations and personal experiences, in addition to governmental guidance, reports, and plans. The "all-hazards" planning currently being undertaken by the key health care system partners in Connecticut as a result of federal funding for preparedness post 9/11 has fostered great working relationships between these entities and their local, regional, and statewide planning counterparts. Many of the specific grant dollars being provided to these facilities can assist in the planning that must be done for pandemic flu.

  1. Planning and Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.

    Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…

  2. Stick with a School Maintenance Plan

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2012-01-01

    The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in…

  3. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  4. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  5. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  6. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  7. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  8. Guidelines for Planning in Colleges and Universities. Volume 4: Physical Plant Planning, Facilities Studies.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…

  9. National Transonic Facility Fan Blade prepreg material characterization tests

    NASA Technical Reports Server (NTRS)

    Klich, P. J.; Richards, W. H.; Ahl, E. L., Jr.

    1981-01-01

    The test program for the basic prepreg materials used in process development work and planned fabrication of the national transonic facility fan blade is presented. The basic prepreg materials and the design laminate are characterized at 89 K, room temperature, and 366 K. Characterization tests, test equipment, and test data are discussed. Material tests results in the warp direction are given for tensile, compressive, fatigue (tension-tension), interlaminar shear and thermal expansion.

  10. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  11. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  12. Planning Staff and Space Capacity Requirements during Wartime.

    PubMed

    Kepner, Elisa B; Spencer, Rachel

    2016-01-01

    Determining staff and space requirements for military medical centers can be challenging. Changing patient populations change the caseload requirements. Deployment and assignment rotations change the experience and education of clinicians and support staff, thereby changing the caseload capacity of a facility. During wartime, planning becomes increasingly more complex. What will the patient mix and caseload volume be by location? What type of clinicians will be available and when? How many beds are needed at each facility to meet caseload demand and match clinician supply? As soon as these factors are known, operations are likely to change and planning factors quickly become inaccurate. Soon, more beds or staff are needed in certain locations to meet caseload demand while other locations retain underutilized staff, waiting for additional caseload fluctuations. This type of complexity challenges the best commanders. As in so many other industries, supply and demand principles apply to military health, but very little is stable about military health capacity planning. Planning analysts build complex statistical forecasting models to predict caseload based on historical patterns. These capacity planning techniques work best in stable repeatable processes where caseload and staffing resources remain constant over a long period of time. Variability must be simplified to predict complex operations. This is counterintuitive to the majority of capacity planners who believe more data drives better answers. When the best predictor of future needs is not historical patterns, traditional capacity planning does not work. Rather, simplified estimation techniques coupled with frequent calibration adjustments to account for environmental changes will create the most accurate and most useful capacity planning and management system. The method presented in this article outlines the capacity planning approach used to actively manage hospital staff and space during Operations Iraqi Freedom and Enduring Freedom.

  13. Planning status report: water resources appraisal for hydroelectric licensing, Potomac River basin, Pennsylvania, Maryland, West Virginia, Virginia, and District of Columbia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-01-01

    Updated information on water resources in the Potomac River Basin is presented for use by the FERC and its staff when considering hydroelectric licensing and other work. The report presents data on water resource developments, existing and potential, and on water use by existing and projected steam-electric generating facilities. Past and present planning studies are summarized.

  14. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  15. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  16. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  17. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  18. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  19. Integrated capabilities in heavy vehicles : human factors research needs

    DOT National Transportation Integrated Search

    2003-10-09

    The Full Road Closure method uses facility closure and total traffic diversion, which may be for one direction or bi-directional traffic flow, to accelerate construction and reduce the negative impacts of work zones. With good planning, interagency c...

  20. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  1. Enforcement Requirements For High-Occupancy Vehicle Facilities, Final Report

    DOT National Transportation Integrated Search

    1995-02-01

    This handbook is designed for technical staff as an instructional guide to the 1990 Census Transportation Planning Package (CTPP) and its potential uses. the CTPP contains 1990 social and economic data by place of residence, place of work, and journe...

  2. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  3. An IMS Station life cycle from a sustainment point of view

    NASA Astrophysics Data System (ADS)

    Brely, Natalie; Gautier, Jean-Pierre; Foster, Daniel

    2014-05-01

    The International Monitoring System (IMS) is to consist of 321 monitoring facilities, composed of four different technologies with a variety of designs and equipment types, deployed in a range of environments around the globe. The International Monitoring System is conceived to operate in perpetuity through maintenance, replacement and recapitalization of IMS facilities' infrastructure and equipment when the end of service life is reached [CTBT/PTS/INF.1163]. Life Cycle techniques and modellization are being used by the PTS to plan and forecast life cycle sustainment requirements of IMS facilities. Through historical data analysis, Engineering inputs and Feedback from experienced Station Operators, the PTS currently works towards increasing the level of confidence on these forecasts and sustainment requirements planning. Continued validation, feedback and improvement of source data from scientific community and experienced users is sought and essential in order to ensure limited effect on data availability and optimal costs (human and financial).

  4. Guidelines for Analysis of Health Facilities Planning in Developing Countries. Volume 5: Health Facilities Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Porter, Dennis R.; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this fifth of ten manuals in the International Health Planning Methods Series deals with health facilities planning in developing countries. While several specific…

  5. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  6. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  7. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  8. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  9. National Wind Tunnel Complex (NWTC)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

  10. Numerical studies of the use of thin high-Z layers for reducing laser imprint in direct-drive inertial-fusion targets

    NASA Astrophysics Data System (ADS)

    Bates, Jason; Schmitt, Andrew; Karasik, Max; Obenschain, Steve

    2012-10-01

    Using the FAST code, we present numerical studies of the effect of thin metallic layers with high atomic number (high-Z) on the hydrodynamics of directly-driven inertial-confinement-fusion (ICF) targets. Previous experimental work on the NIKE Laser Facility at the U.S. Naval Research Laboratory demonstrated that the use of high-Z layers may be efficacious in reducing laser non-uniformities imprinted on the target during the start-up phase of the implosion. Such a reduction is highly desirable in a direct-drive ICF scenario because laser non-uniformities seed hydrodynamic instabilities that can amplify during the implosion process, prevent uniform compression and spoil high gain. One of the main objectives of the present work is to assess the utility of high-Z layers for achieving greater laser uniformity in polar-drive target designs planned for the National Ignition Facility. To address this problem, new numerical routines have recently been incorporated in the FAST code, including an improved radiation-transfer package and a three-dimensional ray-tracing algorithm. We will discuss these topics, and present initial simulation results for high-Z planar-target experiments planned on the NIKE Laser Facility later this year.

  11. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  12. Final report : phase I investigation at the former CCC/USDA grain storage facility in Savannah, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of state-wide screening of private wells near former CCC/USDA facilities, conducted in Missouri by themore » U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently owned and occupied by the Missouri Department of Transportation [MoDOT]), described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the default target level (DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). (The DTL is defined in Section 4.) Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The site characterization at Savannah is being conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A phased approach is being employed by the CCC/USDA and Argonne, with the approval of the MoDNR, so that information obtained and interpretations developed during each incremental stage of the study can be used most effectively to guide subsequent aspects of the program. This report presents the technical findings of Phase I of Argonne's studies. The Phase I investigation was undertaken in accord with the final site-specific Phase I Work Plan for Savannah (Argonne 2007), as well as with the Master Work Plan (MWPK) for CCC/USDAArgonne operations in the state of Kansas (Argonne 2002), which the MoDNR reviewed and approved (with minor revisions) for temporary use in Missouri to facilitate the start-up of the CCC/USDA's activities at Savannah. (Argonne is developing a similar Master Work Plan for operations in Missouri that is based on the existing MWPK, with the approval of the MoDNR. The Missouri document has not been finalized, however, at this time.) The site-specific Savannah Work Plan (Argonne 2007; approved by the MoDNR [2007a]) (1) summarized the pre-existing knowledge base for the Savannah investigation site compiled by Argonne and (2) described the site-specific technical objectives and the intended scope of work developed for this phase of the investigation. Four primary technical objectives were identified for the Phase I studies, as follows: (1) Update the previous (MoDNR 2000a,b) inventory and status of private wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for analyses for volatile organic compounds (VOCs) and geochemical constituents. (2) Investigate for possible evidence of a soil source of carbon tetrachloride contamination to groundwater beneath the former CCC/USDA facility. (3) Obtain preliminary information on the site-specific lithologies and hydrostratigraphy at the former CCC/USDA grain storage location. (4) Establish preliminary groundwater monitoring points, to investigate the patterns of groundwater movement affecting possible contaminant migration near the former CCC/USDA facility.« less

  13. DOE LeRC photovoltaic systems test facility

    NASA Technical Reports Server (NTRS)

    Cull, R. C.; Forestieri, A. F.

    1978-01-01

    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

  14. Survey of solar thermal test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Masterson, K.

    The facilities that are presently available for testing solar thermal energy collection and conversion systems are briefly described. Facilities that are known to meet ASHRAE standard 93-77 for testing flat-plate collectors are listed. The DOE programs and test needs for distributed concentrating collectors are identified. Existing and planned facilities that meet these needs are described and continued support for most of them is recommended. The needs and facilities that are suitable for testing components of central receiver systems, several of which are located overseas, are identified. The central contact point for obtaining additional details and test procedures for these facilitiesmore » is the Solar Thermal Test Facilities Users' Association in Albuquerque, N.M. The appendices contain data sheets and tables which give additional details on the technical capabilities of each facility. Also included is the 1975 Aerospace Corporation report on test facilities that is frequently referenced in the present work.« less

  15. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    NASA Astrophysics Data System (ADS)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  16. Community Relations Plan: Galena Airport and Campion Air Force Station, Alaska

    DTIC Science & Technology

    1994-11-11

    toxic 0k Corporations that are not wastes at any facility listed or proposed for incorporated for the specific listing on the NPL and where site work ... working toward for awarding a TAG, and how to obtain incorporation under state laws. additional information are described. The Applications are...for similar work in the area. Notification Procedures and In special cases, where an applicant Evaluation Criteria group intends to apply for a single

  17. Integration of the SSPM and STAGE with the MPACT Virtual Facility Distributed Test Bed.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipiti, Benjamin B.; Shoman, Nathan

    The Material Protection Accounting and Control Technologies (MPACT) program within DOE NE is working toward a 2020 milestone to demonstrate a Virtual Facility Distributed Test Bed. The goal of the Virtual Test Bed is to link all MPACT modeling tools, technology development, and experimental work to create a Safeguards and Security by Design capability for fuel cycle facilities. The Separation and Safeguards Performance Model (SSPM) forms the core safeguards analysis tool, and the Scenario Toolkit and Generation Environment (STAGE) code forms the core physical security tool. These models are used to design and analyze safeguards and security systems and generatemore » performance metrics. Work over the past year has focused on how these models will integrate with the other capabilities in the MPACT program and specific model changes to enable more streamlined integration in the future. This report describes the model changes and plans for how the models will be used more collaboratively. The Virtual Facility is not designed to integrate all capabilities into one master code, but rather to maintain stand-alone capabilities that communicate results between codes more effectively.« less

  18. The impact of correctional institutions on public health during a pandemic or emerging infection disaster.

    PubMed

    Schwartz, Rachel D

    2008-01-01

    With the growing threat of a naturally occurring or man-made global pandemic, many public, private, federal, state, and local institutions have begun to develop some form of preparedness and response plans. Among those in the front lines of preparedness are hospitals and medical professionals who will be among the first responders in the event of such a disaster. At the other end of the spectrum of preparedness is the Corrections community who have been working in a relative vacuum, in part because of lack of funding, but also because they have been largely left out of state, federal local planning processes. This isolation and lack of support is compounded by negative public perceptions of correctional facilities and their inmates, and a failure to understand the serious impact a jail or prison facility would have on public health in the event of a disaster. This article examines the unique issues faced by correctional facilities responding to disease disasters and emphasizes the importance of assisting them to develop workable and effective preparedness and response plans that will prevent them from becoming disease repositories spreading illness and infection throughout our communities. To succeed in such planning, it is crucial that the public health and medical community be involved in correctional disaster planning and that they should integrate correctional disaster response with their own. Failure to do so endangers the health of the entire nation.

  19. Residential Sampling Report of Walter Coke Inc., Birmingham, Alabama, facility, December 2009

    EPA Pesticide Factsheets

    The field activities and results of the investigation in three residential neighborhoods – Collegeville, Fairmont, and Harriman Park. Performed in accordance with the EPA approved Residential Sampling Work Plan, final revision August 2008 (CH2M HILL, 2008)

  20. 40 CFR 35.2105 - Debarment and suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... unit of government for facilities planning or design work whose name appears on the master list of... applicant should be found non-responsible under part 30 of this subchapter or be the subject of possible debarment or suspension under part 32 of this subchapter. ...

  1. Pawcatuck School.

    ERIC Educational Resources Information Center

    Randall, Kathleen

    1993-01-01

    Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)

  2. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  3. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  4. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  5. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  6. MRP (materiel requirements planning) II implementation: a case study.

    PubMed

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  7. EMMA, a Recoil Mass Spectrometer for TRIUMF's ISAC-II Facility

    NASA Astrophysics Data System (ADS)

    Davids, Barry; EMMA Collaboration

    2016-09-01

    EMMA is a recoil mass spectrometer for TRIUMF's ISAC-II facility in the final stages of installation and commissioning. In this talk I will briefly review the spectrometer's design capabilities, describe recent progress in its installation and commissioning, and discuss plans for its initial experimental program. This work was supported by the Natural Sciences and Engineering Council of Canada. TRIUMF receives federal funds through a contribution agreement with the National Research Council of Canada.

  8. Final report : site reclassification investigation for Courtland, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Dennis, C. B.; Environmental Science Division

    2006-01-31

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), formerly operated a grain storage facility in Courtland, Kansas. Prior to 1986, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the grain industry to preserve stored grain. In 1999, the Kansas Department of Health and Environment (KDHE) identified the former CCC/USDA operation as the likely source of carbon tetrachloride found in groundwater east of the former CCC/USDA facility in Courtland. Sampling by the KDHE in April 1998 had found carbon tetrachloride in the Garman residence lawn and garden well at amore » concentration of 2.1 {micro}g/L and in the Hoard residence lawn and garden well at a concentration of 0.5 {micro}g/L. Subsequent soil and groundwater sampling by the KDHE at the former CCC/USDA facility found no indication of a continuing source, and subsequent sampling of the affected wells showed generally declining contaminant levels. At the request of the KDHE and the CCC/USDA, Argonne National Laboratory prepared a Work Plan for Groundwater Sampling for Potential Site Reclassification, Courtland, Kansas (Argonne 2004). The objective of the proposed work was to conduct a single groundwater monitoring event and collect information necessary to update the status of the previously detected groundwater contamination, in support of an evaluation of appropriate actions for reclassification of the status of this site from active to resolved, under the Intergovernmental Agreement between the KDHE and the USDA's Farm Service Agency (FSA). The reclassification would be in accordance with the KDHE's Reclassification Plan (Policy No. BERRS-024, online at http://www.kdhe.state.ks.us/pdf/ber/scp/reclass.pdf). The KDHE approved the Work Plan on August 8, 2005. Sampling was conducted on September 7, 2005.« less

  9. 44. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant 8, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  10. 31. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS D-1 TO U-10 INCL., NITRATION, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  11. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  12. Summary of Current and Future MSFC International Space Station Environmental Control and Life Support System Activities

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia

    1997-01-01

    This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.

  13. Metrics for Success: Strategies for Enabling Core Facility Performance and Assessing Outcomes

    PubMed Central

    Hockberger, Philip E.; Meyn, Susan M.; Nicklin, Connie; Tabarini, Diane; Auger, Julie A.

    2016-01-01

    Core Facilities are key elements in the research portfolio of academic and private research institutions. Administrators overseeing core facilities (core administrators) require assessment tools for evaluating the need and effectiveness of these facilities at their institutions. This article discusses ways to promote best practices in core facilities as well as ways to evaluate their performance across 8 of the following categories: general management, research and technical staff, financial management, customer base and satisfaction, resource management, communications, institutional impact, and strategic planning. For each category, we provide lessons learned that we believe contribute to the effective and efficient overall management of core facilities. If done well, we believe that encouraging best practices and evaluating performance in core facilities will demonstrate and reinforce the importance of core facilities in the research and educational mission of institutions. It will also increase job satisfaction of those working in core facilities and improve the likelihood of sustainability of both facilities and personnel. PMID:26848284

  14. Metrics for Success: Strategies for Enabling Core Facility Performance and Assessing Outcomes.

    PubMed

    Turpen, Paula B; Hockberger, Philip E; Meyn, Susan M; Nicklin, Connie; Tabarini, Diane; Auger, Julie A

    2016-04-01

    Core Facilities are key elements in the research portfolio of academic and private research institutions. Administrators overseeing core facilities (core administrators) require assessment tools for evaluating the need and effectiveness of these facilities at their institutions. This article discusses ways to promote best practices in core facilities as well as ways to evaluate their performance across 8 of the following categories: general management, research and technical staff, financial management, customer base and satisfaction, resource management, communications, institutional impact, and strategic planning. For each category, we provide lessons learned that we believe contribute to the effective and efficient overall management of core facilities. If done well, we believe that encouraging best practices and evaluating performance in core facilities will demonstrate and reinforce the importance of core facilities in the research and educational mission of institutions. It will also increase job satisfaction of those working in core facilities and improve the likelihood of sustainability of both facilities and personnel.

  15. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  16. Making Meetings Work Better.

    ERIC Educational Resources Information Center

    Standke, Linda

    1978-01-01

    Focusing on the increased use by trainers of off-site facilities for employee training meetings, this article looks at some improvements and the expanding market in the meeting site industry. It also highlights emerging trends in the industry and covers the growth of meeting planning into a profession. (EM)

  17. "Time for Results": An Overview.

    ERIC Educational Resources Information Center

    Alexander, Lamar

    1986-01-01

    Summarizes the work of seven National Governors' Association task forces (on teaching, leadership, parent involvement and choice, readiness, technology, school facilities, and college quality) and the "action agenda" proposed. The governors' recent report is unique for its authorship, the tough issues tackled, and its follow-up plan.…

  18. A Bridge to the Future: Observations on Building a Digital Library.

    ERIC Educational Resources Information Center

    Gaunt, Marianne I.

    2002-01-01

    The experience of Rutgers University Libraries illustrates the extensive planning, work effort, possibilities, and investment required to develop the digital library. Examines these key areas: organizational structure; staff development needs; facilities and the new digital infrastructure; metadata standards/interoperability; digital collection…

  19. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  20. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  1. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  2. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  3. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  4. Inspired Planning

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2009-01-01

    Long-range facility planning is a comprehensive process for preparing education institutions for the future and confirm that facilities meet current needs. A long-range facilities plan (LRFP) evaluates how facilities support programs and the educational needs of students, staff and the community. Each school district or college has unique needs…

  5. Astronaut Pierre Thuot works with Middeck O-Gravity Dynamics Experiment

    NASA Image and Video Library

    1994-03-04

    STS062-52-025 (4-18 March 1994) --- Astronaut Pierre J. Thuot, mission specialist, works with the Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.

  6. Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Image and Video Library

    1994-03-04

    STS062-23-017 (4-18 March 1994) --- Astronaut Charles D. (Sam) Gemar, mission specialist, works with Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.

  7. Spent Fuel Working Group Report. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O`Toole, T.

    1993-11-01

    The Department of Energy is storing large amounts of spent nuclear fuel and other reactor irradiated nuclear materials (herein referred to as RINM). In the past, the Department reprocessed RINM to recover plutonium, tritium, and other isotopes. However, the Department has ceased or is phasing out reprocessing operations. As a consequence, Department facilities designed, constructed, and operated to store RINM for relatively short periods of time now store RINM, pending decisions on the disposition of these materials. The extended use of the facilities, combined with their known degradation and that of their stored materials, has led to uncertainties about safety.more » To ensure that extended storage is safe (i.e., that protection exists for workers, the public, and the environment), the conditions of these storage facilities had to be assessed. The compelling need for such an assessment led to the Secretary`s initiative on spent fuel, which is the subject of this report. This report comprises three volumes: Volume I; Summary Results of the Spent Fuel Working Group Evaluation; Volume II, Working Group Assessment Team Reports and Protocol; Volume III; Operating Contractor Site Team Reports. This volume presents the overall results of the Working Group`s Evaluation. The group assessed 66 facilities spread across 11 sites. It identified: (1) facilities that should be considered for priority attention. (2) programmatic issues to be considered in decision making about interim storage plans and (3) specific vulnerabilities for some of these facilities.« less

  8. Using of New Management Approaches in the Field of Personal Marketing in the Transport Company

    NASA Astrophysics Data System (ADS)

    Matusova, Dominika; Gogolova, Martina

    2017-10-01

    Personal marketing is a relatively new field in the theory and practice of human resources (HR) activities in the corporate and business sector. As a separate area of HR management was established of the earmarking of personnel management. In the article is mentioned about the facility manager. This position introduces a specific category - behaviour of manager. The facility manager has to dispose the skills from the areas: operation and maintenance, property, facility management processes, human factors of environment, planning, function devices, finance and quality management and innovation and communication. In the article is described the situation in transport company, specifically - Railway Company Slovakia, Inc. (ZSSK). Employees of the company works in departments as: managers, sellers, operators for services and maintenance, economists and controllers. The transport company had 5949 employees in 2015. That was about 108 employees more than the previous year. Facility manager and the company, set the targets which want to achieve within the planned time. Beyond the objectives are fundamental the values of company, business vision and mission.

  9. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  10. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  11. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  12. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  13. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  14. Ethiopia's assessment of emergency obstetric and newborn care: setting the gold standard for national facility-based assessments.

    PubMed

    Keyes, Emily B; Haile-Mariam, Abonesh; Belayneh, Neghist T; Gobezie, Wasihun A; Pearson, Luwei; Abdullah, Muna; Kebede, Henok

    2011-10-01

    To describe the methods used to implement Ethiopia's 2008 emergency obstetric and newborn care services (EmONC) assessment; highlight how the collaborative process contributed to immediate integration of results into national and subnational planning; and explain how the experience informed the development of a set of tools providing best practices and guidelines for other countries conducting similar assessments. A team of maternal and newborn health experts from the Federal Ministry of Health (FMOH), the United Nations Children's Fund (UNICEF), the World Health Organization (WHO), and the United Nations Population Fund (UNFPA), together with representatives from the Ethiopian Society of Obstetricians and Gynecologists, provided technical guidance for the 18-month process and facilitated demand for and use of the assessment results. Eighty-four trained data collectors administered 9 data collection modules in 806 public and private facilities. Field work and data were managed by a private firm who, together with the core team, implemented a multi-layered plan for data quality. Columbia University's Averting Maternal Death and Disability Program provided technical assistance. Results were published in national and regional reports and in 1-page facility factsheets informing subnational planning activities. Assessment results-which have been published in journal articles-informed water infrastructure improvements, efforts to expand access to magnesium sulfate, and FMOH and UN planning documents. The assessment also established a permanent database for future monitoring of the health system, including geographic locations of surveyed facilities. Ethiopia's assessment was successful largely because of active local leadership, a collaborative process, ample financial and technical support, and rapid integration of results into health system planning. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  15. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  16. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  17. KDHE POroject Code: C6-074-00002: Progress and Monitoring Report for the LBD/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  18. PLANNING THE ART ROOM.

    ERIC Educational Resources Information Center

    POPOLIZIO, VINCENT J.; AND OTHERS

    FACILITIES FOR CARRYING OUT AN ART PROGRAM MUST BE DESIGNED TO MEET THE NEEDS OF STUDENTS IN SCHOOL AND THOSE ENROLLED IN ADULT PROGRAMS. PROVISIONS MUST BE INCLUDED FOR PAINTING AND DRAWING, THE GRAPHIC ARTS, GENERAL CRAFTS, MODELING, SCHULPTURING, PHOTOGRAPHY, SERIGRAPHY, AND MECHANICAL DRAWING. WORK CENTERS AND TRAFFIC FLOW NEED CAREFUL…

  19. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  20. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  1. Serving future transportation needs : succession planning for a state department of transportation organization, its people & mission.

    DOT National Transportation Integrated Search

    2011-06-01

    This project will examine the employment of people who accomplish the work of the Department of Transportation & Public Facilities : (AKDOT&PF) those who will serve the future transportation needs of Alaska. The study will focus primarily on prof...

  2. Translator Plan: A Coordinated Vision for Fiscal Years 2018-2020

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riihimaki, Laura; Comstock, Jennifer; Collis, Scott

    In June of 2017, the Translator Group met to develop this coordinated three-year vision plan, incorporating key feedback and aligning to ARM’s mission priorities. This plan responds to a shift in how we determine our priorities, given the new needs of the ARM Facility. In the past, individual Translators have determined priorities in conversation with individual DOE Atmospheric System Research (ASR) working groups. To better support ARM’s Decadal Vision (https://www.arm.gov/publications/programdocs/doe-sc-arm-14-029.pdf), however, the Translator Group is instead developing a coordinated response to needs from our user community to better balance resources and skills among participants. This approach agrees with direction frommore » ARM leadership and the ARM-ASR Coordination Team (AACT). To develop this plan the Translator Group reviewed feedback received from the User Executive Committee (UEC) and the Triennial Review, as well as priorities from ASR working groups and Principal Investigators (PIs), the LES ARM Symbiotic Simulation and Observation (LASSO) project, and new instrumentation and activities as described by the ARM Technical Director. In particular, we are responding to the advice that we were trying to do too much, and should focus on providing additional support to data quality, uncertainty assessment, a timeline for producing core VAPs from ARM Mobile Facility (AMF) campaigns, and supporting key aspects of the Decadal Vision.« less

  3. A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    PEERY, A.B.

    A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…

  4. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  5. 40 CFR 62.5100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Plan for Control... plan. (a) Identification of plan. Maryland Plan for Control Designated Pollutants from Existing Facilities (Section 111(d) plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric...

  6. 40 CFR 62.10100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...

  7. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  8. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1993-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology; and (2) developing general methods and tools for building similar explanation facilities in other domains.

  9. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1994-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology, and (2) developing general methods and tools for building similar explanation facilities in other domains.

  10. Development of a Work Control System for Propulsion Testing at NASA Stennis

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2005-01-01

    In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.

  11. 40 CFR 62.8350 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Carolina Plan for... Identification of plan. (a) Identification of plan. North Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric acid mist emissions from...

  12. Planning for Future Forms of Education: Towards an Educational and Educational Facilities Planning Model.

    ERIC Educational Resources Information Center

    Leu, Donald J.

    The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…

  13. Serving future transportation needs : succession planning for a state department of transportation organization, its people & mission. [Executive summary].

    DOT National Transportation Integrated Search

    2011-06-01

    This project will examine the employment of people who accomplish the work of the Department of Transportation & Public Facilities : (AKDOT&PF) those who will serve the future transportation needs of Alaska. The study will focus primarily on prof...

  14. 36 CFR 1254.102 - What requests does NARA not approve?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...

  15. 36 CFR 1254.102 - What requests does NARA not approve?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...

  16. 36 CFR 1254.102 - What requests does NARA not approve?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...

  17. 36 CFR 1254.102 - What requests does NARA not approve?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...

  18. 33. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS MODIFICATIONS FOR STRETCHED TANK DELTA, LAUNCH COMPLEX 17-A: PAD AREA PLAN-REMOVAL WORK, CIVIL, APRIL 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28501, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  19. Planning an Anti-Racism Initiative. Project Change.

    ERIC Educational Resources Information Center

    Batten Susan T.; Leiderman, Sally A.

    Project Change was launched by the Levi Strauss Foundation in 1991 as an initiative to address racial prejudice and institutional racism in communities in which Levi Strauss & Co. had facilities. Working with multiracial coalitions in Albuquerque (New Mexico), El Paso (Texas), Valdosta (Georgia), and Knoxville (Tennessee), the Foundation and…

  20. 77 FR 73683 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Escape and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... for OMB Review; Comment Request; Escape and Evacuation Plans for Surface Coal Mines and Surface Facilities and Surface Work Areas of Underground Coal Mines ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Mine safety and Health Administration (MSHA) sponsored information collection...

  1. School Transformation + Development Map

    ERIC Educational Resources Information Center

    Locker, Frank M.

    2010-01-01

    The field of education has highly varied educational practices and facilities needs. Still, much of education continues to be delivered in the recognizable tradition of teachers working alone in isolated classrooms and buildings planned based on rows and rows of those classrooms. But there is no longer one single, universal view of how education…

  2. Food Service: How and What to Plan.

    ERIC Educational Resources Information Center

    Buchanan, Robert D.

    1962-01-01

    The effectiveness of food service facilities will be greatly enhanced by--(1) developing operating policies early in the design stage, (2) translating menus and recipes into space, time, amounts, and equipment, (3) arranging kitchen functions and work centers into straight line flow, and (4) evaluation. Operating policies and procedures must be…

  3. Recent Upgrades at the Fermilab Test Beam Facility

    NASA Astrophysics Data System (ADS)

    Rominsky, Mandy

    2016-03-01

    The Fermilab Test Beam Facility is a world class facility for testing and characterizing particle detectors. The facility has been in operation since 2005 and has undergone significant upgrades in the last two years. A second beam line with cryogenic support has been added and the facility has adopted the MIDAS data acquisition system. The facility also recently added a cosmic telescope test stand and improved tracking capabilities. With two operational beam lines, the facility can deliver a variety of particle types and momenta ranging from 120 GeV protons in the primary beam line down to 200 MeV particles in the tertiary beam line. In addition, recent work has focused on analyzing the beam structure to provide users with information on the data they are collecting. With these improvements, the Fermilab Test Beam facility is capable of supporting High Energy physics applications as well as industry users. The upgrades will be discussed along with plans for future improvements.

  4. Activities of the US-Japan Safety Monitor Joint Working Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richard L. Savercool; Lee C. Cadwallader

    2004-09-01

    This paper documents the activities of the US-Japan exchange in the area of personnel safety at magnetic and laser fusion experiments. A near-miss event with a visiting scientist to the US in 1992 was the impetus for forming the Joint Working Group on Fusion Safety. This exchnge has been under way for over ten years and has provided many safety insights for both US and Japanese facility personnel at national institutes and at universities. The background and activities of the Joint Working Group are described, including the facilities that have been visited for safety walkthroughs, the participants from both countries,more » and the main safety issues examined during visits. Based on these visits, some operational safety ideas to enhance experiment safety are given. The near-term future plans of the Safety Monitor Joint Working group are also discussed.« less

  5. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  6. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

  7. 40 CFR 265.55 - Emergency coordinator.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.55 Emergency coordinator. At all times, there must... aspects of the facility's contingency plan, all operations and activities at the facility, the location... out the contingency plan. [Comment: The emergency coordinator's responsibilities are more fully...

  8. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Wickenheiser, Timothy J.; Doherty, Michael P.; Marshall, Albert; Bhattacharryya, Samit K.; Warren, John

    1992-01-01

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  9. 42. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (NashVille, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  10. 29. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. D-1 TO D-10 INCL., NITRATION, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  11. 26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART I, SECTION 8, BUILDINGS NO. C-1, C-3, C-5, C-6, C-7, C-9, MIXING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  12. 27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS C-1, C-3, C-5, C-6, C-7, C-9 INCL., MIXING, MANUFACTURING AREA, PLANT 'B'.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  13. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  14. Developing State Agency Facility Plans: A Guide to Planning and Implementation. Michigan Studies in Rehabilitation Utilization Series: 4.

    ERIC Educational Resources Information Center

    Miller, Juliet V.; Wargel, James F.

    Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…

  15. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private wellmore » sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride and chloroform into four homes located on or adjacent to the former CCC/USDA facility. The technical objective will be accomplished by collecting sub-slab vapor samples. The preliminary data collected during the July 2007 investigation did not fully address the source of or migration pathway for the carbon tetrachloride detected in the four homes. The scope of work proposed here will generate additional data needed to help evaluate whether the source of the detected carbon tetrachloride is vapor intrusion attributable to activities of the CCC/USDA. The additional vapor sampling at Hanover will be performed, on behalf of the CCC/USDA, by the Environmental Science Division of Argonne National Laboratory and H&P Mobile Geochemistry of San Diego (http://www.handpmg.com). Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The professional staff members of H&P Mobile Geochemistry are nationally leading experts in soil gas sampling and vapor intrusion investigations.« less

  16. Duty Rosters and Workloads of Obstetricians in Germany: Results of a Germany-wide Survey.

    PubMed

    Neimann, Johannes; Knabl, Julia; Puppe, Julian; Bayer, Christian Michael; Gass, Paul; Gabriel, Lena; Seelbach-Goebel, Birgit; Lermann, Johannes; Schott, Sarah

    2017-08-01

    Compiling a daily hospital roster which complies with existing laws and tariff regulations and meets the requirements for ongoing professional training while also taking the legal regulations on the health of employees into account makes planning the duty roster a challenge. The aim of this study was to obtain a realistic picture of existing duty roster systems and of the current workloads of obstetricians in Germany. This online survey was sent to 2770 physicians training to become obstetricians or specializing in specific areas of obstetric care. The survey consisted of an anonymized 95-item questionnaire which collected data on different types of duty roster systems and the workload of obstetricians in Germany for the period from 17.02.2015 to 16.05.2015. Out of a total of 2770 physicians who were contacted, 437 (16%) completed the questionnaire. Across all forms of care, the care provided outside normal working hours usually (75%) consisted of a combination of regular working times and on-call duty or even consisted entirely of standby duty. Level I perinatal centers were most likely 20% (n = 88) to have a shift system in place. Working a shift system was significantly more common in care facilities which had previously carried out a job analysis. The number of physicians in hospitals who are present during the night shift was higher in facilities with higher numbers of births and in facilities which offered higher levels of care. In addition to regularly working overtime and the fact that often not all the hours worked were recorded, it was notable that the systems used to compile duty rosters often did not comply with legal regulations or with collectively agreed working hours nor were they compatible with the staff planning requirements. The results of this study show that the conditions of work, the working times, and the organization of working times in obstetric departments are in need of improvement. Recording the actual times worked together with an analysis of the activities performed during working times and while on standby would increase the level of transparency for employers and employees.

  17. PubMed Central

    Neimann, Johannes; Knabl, Julia; Puppe, Julian; Bayer, Christian Michael; Gass, Paul; Gabriel, Lena; Seelbach-Goebel, Birgit; Lermann, Johannes; Schott, Sarah

    2017-01-01

    Background Compiling a daily hospital roster which complies with existing laws and tariff regulations and meets the requirements for ongoing professional training while also taking the legal regulations on the health of employees into account makes planning the duty roster a challenge. The aim of this study was to obtain a realistic picture of existing duty roster systems and of the current workloads of obstetricians in Germany. Method This online survey was sent to 2770 physicians training to become obstetricians or specializing in specific areas of obstetric care. The survey consisted of an anonymized 95-item questionnaire which collected data on different types of duty roster systems and the workload of obstetricians in Germany for the period from 17.02.2015 to 16.05.2015. Results Out of a total of 2770 physicians who were contacted, 437 (16%) completed the questionnaire. Across all forms of care, the care provided outside normal working hours usually (75%) consisted of a combination of regular working times and on-call duty or even consisted entirely of standby duty. Level I perinatal centers were most likely 20% (n = 88) to have a shift system in place. Working a shift system was significantly more common in care facilities which had previously carried out a job analysis. The number of physicians in hospitals who are present during the night shift was higher in facilities with higher numbers of births and in facilities which offered higher levels of care. In addition to regularly working overtime and the fact that often not all the hours worked were recorded, it was notable that the systems used to compile duty rosters often did not comply with legal regulations or with collectively agreed working hours nor were they compatible with the staff planning requirements. Outlook The results of this study show that the conditions of work, the working times, and the organization of working times in obstetric departments are in need of improvement. Recording the actual times worked together with an analysis of the activities performed during working times and while on standby would increase the level of transparency for employers and employees. PMID:28845054

  18. 75 FR 13806 - Agency Information Collection Activity Seeking OMB Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... 40117(k), Competition Plans, and to carry out a passenger facility charge application. DATES: Please... . SUPPLEMENTARY INFORMATION: Federal Aviation Administration (FAA) Title: Competition Plans, Passenger Facility...), Competition Plans, and to carry out a passenger facility charge application. The affected public includes...

  19. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES FOR CENTRAL SCHOOLS. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES, NO. 10.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    PLANNING OUTDOOR PHYSICAL EDUCATION FACILITIES FOR THE CENTRAL SCHOOL SERVING PUPILS FROM KINDERGARTEN THROUGH HIGH SCHOOL SHOULD TAKE INTO ACCOUNT THE NEEDS AND INTERESTS OF ALL PUPILS DURING THE SCHOOL YEAR AND SHOULD PROVIDE FOR RECREATION NEEDS DURING VACATION PERIODS. PROVISION FOR RECREATIONAL FACILITIES FOR ADULTS SHOULD ALSO BE MADE. THE…

  20. Design for an integrated discipline operations control center for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Haines, Richard F.

    1993-01-01

    This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.

  1. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  2. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  3. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  4. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  5. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  6. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherinemore » Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.« less

  7. Optimizing Endoscope Reprocessing Resources Via Process Flow Queuing Analysis.

    PubMed

    Seelen, Mark T; Friend, Tynan H; Levine, Wilton C

    2018-05-04

    The Massachusetts General Hospital (MGH) is merging its older endoscope processing facilities into a single new facility that will enable high-level disinfection of endoscopes for both the ORs and Endoscopy Suite, leveraging economies of scale for improved patient care and optimal use of resources. Finalized resource planning was necessary for the merging of facilities to optimize staffing and make final equipment selections to support the nearly 33,000 annual endoscopy cases. To accomplish this, we employed operations management methodologies, analyzing the physical process flow of scopes throughout the existing Endoscopy Suite and ORs and mapping the future state capacity of the new reprocessing facility. Further, our analysis required the incorporation of historical case and reprocessing volumes in a multi-server queuing model to identify any potential wait times as a result of the new reprocessing cycle. We also performed sensitivity analysis to understand the impact of future case volume growth. We found that our future-state reprocessing facility, given planned capital expenditures for automated endoscope reprocessors (AERs) and pre-processing sinks, could easily accommodate current scope volume well within the necessary pre-cleaning-to-sink reprocessing time limit recommended by manufacturers. Further, in its current planned state, our model suggested that the future endoscope reprocessing suite at MGH could support an increase in volume of at least 90% over the next several years. Our work suggests that with simple mathematical analysis of historic case data, significant changes to a complex perioperative environment can be made with ease while keeping patient safety as the top priority.

  8. National Ignition Facility quality assurance program plan revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program willmore » be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.« less

  9. Strengthening government health and family planning programs: findings from an action research project in rural Bangladesh.

    PubMed

    Simmons, R; Phillips, J F; Rahman, M

    1984-01-01

    An ongoing study at the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) is based on the premise that public sector health and family planning programs can be improved through an assessment of the dysfunctional aspects of their operations, the development of problem-solving capabilities, and the transfer of strategies successfully tested in a small-scale pilot project. This paper reports findings from a field trial implemented in a subunit of the project area at an early stage of the project. Operational barriers to public sector program implementation are discussed with regard to the quantity of work, the quality of work, supplies and facilities, integration of health and family planning, and leadership, supervision, and decision making. Initial results of the ICDDR,B intervention on these managerial processes are also indicated.

  10. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  11. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  12. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  13. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  14. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Eligibility to elect an MA plan for senior housing..., Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan, the...

  15. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  16. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  17. X-ray Cryogenic Facility (XRCF) Handbook

    NASA Technical Reports Server (NTRS)

    Kegley, Jeffrey R.

    2016-01-01

    The X-ray & Cryogenic Facility (XRCF) Handbook is a guide for planning operations at the facility. A summary of the capabilities, policies, and procedures is provided to enhance project coordination between the facility user and XRCF personnel. This handbook includes basic information that will enable the XRCF to effectively plan and support test activities. In addition, this handbook describes the facilities and systems available at the XRCF for supporting test operations. 1.2 General Facility Description The XRCF was built in 1989 to meet the stringent requirements associated with calibration of X-ray optics, instruments, and telescopes and was subsequently modified in 1999 & 2005 to perform the challenging cryogenic verification of Ultraviolet, Optical, and Infrared mirrors. These unique and premier specialty capabilities, coupled with its ability to meet multiple generic thermal vacuum test requirements for large payloads, make the XRCF the most versatile and adaptable space environmental test facility in the Agency. XRCF is also recognized as the newest, most cost effective, most highly utilized facility in the portfolio and as one of only five NASA facilities having unique capabilities. The XRCF is capable of supporting and has supported missions during all phases from technology development to flight verification. Programs/projects that have benefited from XRCF include Chandra, Solar X-ray Imager, Hinode, and James Webb Space Telescope. All test programs have been completed on-schedule and within budget and have experienced no delays due to facility readiness or failures. XRCF is currently supporting Strategic Astrophysics Technology Development for Cosmic Origins. Throughout the years, XRCF has partnered with and continues to maintain positive working relationships with organizations such as ATK, Ball Aerospace, Northrop Grumman Aerospace, Excelis (formerly Kodak/ITT), Smithsonian Astrophysical Observatory, Goddard Space Flight Center, University of Alabama Huntsville, and more.

  18. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  19. Space facilities: Meeting future needs for research, development, and operations

    NASA Astrophysics Data System (ADS)

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  20. Prevention and management of "do not return" notices: a quality improvement process for supplemental staffing nursing agencies.

    PubMed

    Ade-Oshifogun, Jochebed Bosede; Dufelmeier, Thaddeus

    2012-01-01

    This article describes a quality improvement process for "do not return" (DNR) notices for healthcare supplemental staffing agencies and healthcare facilities that use them. It is imperative that supplemental staffing agencies partner with healthcare facilities in assuring the quality of supplemental staff. Although supplemental staffing agencies attempt to ensure quality staffing, supplemental staff are sometimes subjectively evaluated by healthcare facilities as "DNR." The objective of this article is to describe a quality improvement process to prevent and manage "DNR" within healthcare organizations. We developed a curriculum and accompanying evaluation tool by adapting Rampersad's problem-solving discipline approach: (a) definition of area(s) for improvement; (b) identification of all possible causes; (c) development of an action plan; (d) implementation of the action plan; (e) evaluation for program improvement; and (f) standardization of the process. Face and content validity of the evaluation tool was ascertained by input from a panel of experienced supplemental staff and nursing faculty. This curriculum and its evaluation tool will have practical implications for supplemental staffing agencies and healthcare facilities in reducing "DNR" rates and in meeting certification/accreditation requirements. Further work is needed to translate this process into future research. © 2012 Wiley Periodicals, Inc.

  1. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I cover more than one facility in my... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.3 May I cover more than one facility in my response plan? (a) Your response plan may be for a...

  2. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  3. IDENTIFICATION AND CHARACTERIZATION OF FIVE NON- TRADITIONAL SOURCE CATEGORIES: CATASTROPHIC/ACCIDENTAL RELEASES, VEHICLE REPAIR FACILITIES, RECYCLING, PESTICIDE APPLICATION, AND AGRICULTURAL OPERATIONS

    EPA Science Inventory

    The report gives results of work that is part of EPA's program to identify and characterize emissions sources not currently accounted for by either the existing Aerometric Information Retrieval System (AIRS) or State Implementation Plan (SIP) area source methodologies and to deve...

  4. 36 CFR § 1254.102 - What requests does NARA not approve?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...

  5. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  6. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  7. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  8. OECD Work on Future Educational Environments

    ERIC Educational Resources Information Center

    Theisens, Henno; Benavides, Francisco; Dumont, Hanna

    2008-01-01

    Designing school buildings to respond to change is not a new idea. But perhaps what is different today is the kind and degree of change which we have to anticipate. The OECD is carrying out projects that can help in the planning and design of future educational facilities--exploring trends in education and studying innovative learning…

  9. Recommendations for Child Care Centers. Revised Edition.

    ERIC Educational Resources Information Center

    Moore, Gary T.; Lane, Carol G.; Hill, Ann B.; Cohen, Uriel; McGinty, Tim

    Part of a seven-volume series on children's environments, this monograph is a design guide for policy, planning, programming, design, and evaluation of early childhood facilities. The design guide includes 115 patterns for large, medium, and small child care centers in neighborhood and work-place settings. Many of the patterns are appropriate also…

  10. Workshops for the Handicapped; An Annotated Bibliography - No. 6.

    ERIC Educational Resources Information Center

    Perkins, Dorothy C., Comp.; And Others

    An annotated bibliography of workshops for the handicapped covers the literature on work programs for the period July, 1968 through June, 1969. One hundred and fifty four publications were reviewed; the number of articles on administration, management, and planning of facilities and programs has increased since the last edition. (Author/RJ)

  11. Facilities Planning Conference for Community-Junior College State-Level Personnel.

    ERIC Educational Resources Information Center

    Florida Univ., Gainesville. Inst. of Higher Education.

    This report on planning and developing facilities for community-junior colleges includes papers presented at a conference for state-level facility planners. The meeting covered the following areas: (1) development of physical facilities responsive to educational programs and community needs; (2) efficient use of existing facilities through…

  12. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  13. Maintenance Business Plans.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  14. Facility Planning for Physical Education, Recreation, and Athletics.

    ERIC Educational Resources Information Center

    Flynn, Richard B., Ed.

    This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…

  15. A Guide for Planning Indoor Facilities for College Physical Education.

    ERIC Educational Resources Information Center

    Crawford, Wayne H.

    Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…

  16. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  17. Planning the Library Media Center Facility for the 1990s and Beyond.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This manual presents recommendations for incorporating present and future technological changes into workable, efficient, pleasant school library media facilities in two major sections: Planning the Facility and Activity Areas. The first section addresses the planning process (appointing the building committee, evaluating the library media…

  18. School Building Designs: Principles and Challenges of the 21st Century.

    ERIC Educational Resources Information Center

    Chan, T. C.

    2002-01-01

    Reviews school-facility challenges and design principles described in 2000 U.S. Department of Education report on school planning and design. Describes additional school-facility design challenges and planning principles. Describes five critical facility-planning issues for the 21st Century. (Contains 14 references.) (PKP)

  19. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  20. Planning Physical Education and Athletic Facilities in Schools.

    ERIC Educational Resources Information Center

    Penman, Kenneth A.

    This book is primarily designed for a course in planning physical education and athletic facilities and as a supplementary textbook for administration courses. It illustrates the skills necessary for designing and planning facilities, stresses the need for effective communication between planners and users, and covers elementary through college…

  1. LANL Safety Conscious Work Environment (SCWE) Self-Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hargis, Barbara C.

    2014-01-29

    On December 21, 2012 Secretary of Energy Chu transmitted to the Defense Nuclear Facilities Safety Board (DNFSB) revised commitments on the implementation plan for Safety Culture at the Waste Treatment and Immobilization Plant. Action 2-5 was revised to require contractors and federal organizations to complete Safety Conscious Work Environment (SCWE) selfassessments and provide reports to the appropriate U.S. Department of Energy (DOE) - Headquarters Program Office by September 2013. Los Alamos National Laboratory (LANL) planned and conducted a Safety Conscious Work Environment (SCWE) Self-Assessment over the time period July through August, 2013 in accordance with the SCWE Self-Assessment Guidance providedmore » by DOE. Significant field work was conducted over the 2-week period August 5-16, 2013. The purpose of the self-assessment was to evaluate whether programs and processes associated with a SCWE are in place and whether they are effective in supporting and promoting a SCWE.« less

  2. Conceptual definition of a technology development mission for advanced solar dynamic power systems

    NASA Technical Reports Server (NTRS)

    Migra, R. P.

    1986-01-01

    An initial conceptual definition of a technology development mission for advanced solar dynamic power systems is provided, utilizing a space station to provide a dedicated test facility. The advanced power systems considered included Brayton, Stirling, and liquid metal Rankine systems operating in the temperature range of 1040 to 1400 K. The critical technologies for advanced systems were identified by reviewing the current state of the art of solar dynamic power systems. The experimental requirements were determined by planning a system test of a 20 kWe solar dynamic power system on the space station test facility. These requirements were documented via the Mission Requirements Working Group (MRWG) and Technology Development Advocacy Group (TDAG) forms. Various concepts or considerations of advanced concepts are discussed. A preliminary evolutionary plan for this technology development mission was prepared.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  5. Defense switched network technology and experiments program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1983-09-01

    This report documents work performed during FY 1983 on the DCA-sponsored Defense Switched Network Technology and Experiments Program. The areas of work reported are: (1) development of routing algorithms for application in the Defense Switched Network (DSN); (2) instrumentation and integration of the Experimental Integrated Switched Network (EISN) test facility; (3) development and test of data communication techniques using DoD-standard data protocols in an integrated voice/data network; and (4) EISN system coordination and experiment planning.

  6. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  7. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  8. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  9. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  10. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  11. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  12. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  13. 77 FR 73060 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility... for a fuel cycle facility (NUREG-1520) provides NRC staff guidance for reviewing and evaluating the...

  14. 75 FR 68831 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...

  15. 78 FR 67223 - Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ..., 72, et al. Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 and Amendments to Material Control and Accounting Regulations; Proposed Rules #0;#0... Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 AGENCY...

  16. Planning guidelines for computerized transaxial tomography (CT)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-11-23

    Guidelines to assist local communities in review and decisionmaking related to computerized tomography (CT) 'head' and 'whole body' scanner needs and placement are presented. Although medical benefits for head scanning are well established, the proper role of whole body scanning in relation to other diagnostic procedures has not been determined. It is recommended that a 20 percent weighted consideration could be given to a potential CT scanner applicant's present capabilities in diagnostic 'body' work. The following guidelines for CT are recommended for use in assessing work qualifications of potential CT scanner applicants: (1) The facility must have an active neurosurgicalmore » service, with a geographically full-time board - certified neurosurgeon and at least 50 intracranial procedures performed annually. (2) The facility must have an active neurological service, with a geographically full-time board - certified neurologist. (3) The facility must have on staff a qualified neuroradiologist. It is recommended that the CT scanner utilization level be a minimum of 3,000 examinations per year per unit of new equipment. The applicant must submit financial data and must be committed to providing care to all patients, independent of ability to pay. The applicant must submit letters from area hospitals agreeing to utilize the scanner services. Additional criteria are given for body scanning work and for the number of scanners in a specific area. Detailed information is presented about scanner development and use in southeastern Pennsylvania and neighboring planning areas, and the cost of scanner operations is compared with revenues. The CT scanner committee membership is included.« less

  17. The Worker Exposure Failure Modes and Effects Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee C. Cadwallader

    2004-09-01

    This paper documents the activities of the US-Japan exchange in the area of personnel safety at magnetic and laser fusion experiments. A near-miss event with a visiting scientist to the US in 1992 was the impetus for forming the Joint Working Group on Fusion Safety. This exchange has been under way for over ten years and has provided many safety insights for both US and Japanese facility personnel at national institutes and at universities. The background and activities of the Joint Working Group are described, including the facilities that have been visited for safety walkthroughs, the participants from both countries,more » and the main safety issues examined during visits. Based on these visits, some operational safety ideas to enhance experiment safety are given. The near-term future plans of the Safety Monitor Joint Working Group are also discussed.« less

  18. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  19. Availability and Quality of Family Planning Services in the Democratic Republic of the Congo: High Potential for Improvement.

    PubMed

    Mpunga, Dieudonné; Lumbayi, J P; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert

    2017-06-27

    To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as "high" if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or "low" if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services ( P <.001). Public facilities were less likely than private facilities to have high-quality services ( P =.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. © Mpunga et al.

  20. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  1. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  2. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  3. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  4. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  5. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  6. "Doing" diversity. Holy Cross Health System facilities honor differences in different ways.

    PubMed

    Burnside, G

    1994-12-01

    Holy Cross Health System (HCHS), a South Bend, IN-based organization that stretches from coast to coast, has instituted a diversity initiative to take advantage of demographic changes in its facilities' work forces and the communities they are serving. Launched by Holy Cross's corporate headquarters, the program is carried out by the member facilities, each of which had added its own ideas. HCHS's diversity program has three major components: Consciousness-raising among employees. Activities range from "transcultural rounds" for nursing students to fashion shows in which employees wear costumes from their places of national origin. Educating the larger community. HCHS facilities have been urged to increase awareness of diversity among physicians, patients, vendors, and local business and civic leaders. Strategic thinking. The leaders of HCHS facilities have been advised to integrate diversity into their strategic planning. Leaders are familiarizing themselves with the different cultural, ethnic, and religious groups in the community and preparing their facilities to take full advantage of those groups' contributions.

  7. Template for updating regulations in QA manuals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.G.; Banerjee, B.

    1992-01-01

    Recently, the U.S. Department of Energy (DOE) issued new quality assurance (QA) orders to reflect current policies for conduct and operation of DOE-authorized programs and facilities. Establishing traceability to new QA criteria and requirements from former multidraft orders, QA manuals, and guidance documentation for DOE-funded work can be confusing. Identified critical considerations still must be addressed. Most of the newly stated QA criteria can be cross referenced, where applicable, to former QA plans and manuals. Where additional criteria occur, new procedures may be required, together with revisions in QA plans and manuals.

  8. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  9. A Guide for Planning and Construction of Public School Facilities in Georgia. School Food Service Facilities.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…

  10. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  11. Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.

    PubMed

    Johnson, Doug; Ugaz, Jorge

    2016-09-01

    We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality. © 2016 The Population Council, Inc.

  12. An oxymoron of long-term care-Sheltering-in-place during an evacuation: A literature review of the best practices of evacuation and sheltering-in-place for long-term care facilities.

    PubMed

    Baxter, Megan

    Long-term care facilities (LTCFs) are defined as residential facilities that are home to elderly patrons who are no longer able to live independently. These facilities require comprehensive emergency planning to provide the best response to the threat of a disaster for their residents. However, LTCFs are often overlooked in disaster planning, leaving them to work independently to create suitable arrangements in the event of a disaster. This article examines the literature on evacuating and compares it to the literature on sheltering-in-place for LTCFs. Conclusions regarding best practices are also provided. A literature review and Internet search were completed in July 2016. Information was entered onto a spreadsheet listing the key points of each article, which was reviewed for emerging themes. Out of the 399 acquired articles and grey literature found during the research portion of this article, 30 were deemed pertinent, 22 of which appear in this article. All included articles were peer reviewed. Themes emerging from these articles include the persistent absence of research into the best practices for LTCFs during emergencies and the difficulties of evacuating and sheltering-in-place with frail populations. While there is no one right answer for all scenarios, sheltering-in-place appears to be the default safe option for those in LTCFs-with the assumption that the facility has taken steps toward preparation, such as purchasing generators and securing enough food, water, and medical supplies to sustain the residents, staff, and families of both for 7 days. Additionally, a LTCF needs to devise contingency plans for evacuation if necessary, to be fully prepared for a catastrophic event.

  13. Child Care Options: A Workplace Initiative for the 21st Century.

    ERIC Educational Resources Information Center

    Sher, Margery Leveen; Fried, Madeline

    This book examines the business community's responsibility to aid employees and their families with child care. It provides information on why businesses should provide child care and how to plan and manage a work-place child care facility. The 11 chapters cover: (1) program design; (2) architecture; (3) playground design; (4) security; (5)…

  14. CASI Work Plan: Calendar Year 2013

    DTIC Science & Technology

    2013-02-15

    reducing energy consumption in existing Army barracks using innovative heating, ventilating , and air-conditioning (HVAC) and building envelope...to enhance the effective “R-value” of insulation, thus reducing energy transfer through walls while maintaining comfortable temperatures for... consumption below ASHRAE’s goal for new facilities. This project will determine how effective the daylighting strategies are in providing adequate

  15. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... is designed primarily for informational purposes and to assist EPA management. Section 300.425(e)(3... building or asphalt pavement. Primary operations at the SMS Instruments facility consisted of overhauling... settlement with EPA in 1988 and the EPA took over all work associated with OU-1 and OU-2 Remedial Design and...

  16. Planning Jobs for People. Annual Report, No. 5, 1 July 71-30 June 72.

    ERIC Educational Resources Information Center

    Economic Development Administration (DOC), Washington, DC.

    The study reports on activities which include 59 management assistance projects resulting in 1,983 jobs and payrolls amounting to $9,097,000. In addition, the report describes work with local community leaders to make available information and techniques needed to provide public facilities in support of economic development. The report describes…

  17. Layout, Equipment, and Work Methods for School Lunch Kitchens and Serving Lines.

    ERIC Educational Resources Information Center

    Biedermann, Konrad; And Others

    The objectives of this study include the development of (1) guides for the planning and the remodeling of new school kitchens and lunchroom facilities and (2) standards of labor utilization for three sizes of cafeterias. The data reflect the results of over six weeks of observation and measurement of operations in various school kitchens,…

  18. Potential for Expatriate Involvement with Handicapped Children in the N.W.F.P. of Pakistan.

    ERIC Educational Resources Information Center

    Miles, M.

    The North West Frontier Province of Pakistan plans to improve services and facilities for handicapped children and is encouraging expatriates to bring their skills to Pakistan. Staff of current institutions are either untrained or have received short courses of training within Pakistan. There are currently about five expatriates working in the…

  19. 75 FR 4842 - Notice of Availability of Record of Decision for the Yuma Field Office Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... Conservation Service; the Yuma County Department of Public Works; the city of Yuma; the U.S. Army Yuma Proving..., recreational, geological, educational, scientific, and scenic values that balance multiple uses of the BLM... cultural resources for which the area is designated; (2) Recreation facilities are limited to projects that...

  20. Science Facilities for Mississippi Schools, Grades 1-12.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Div. of Instruction.

    Prepared to assist those planning the construction of new science facilities on the elementary, intermediate, or secondary school level. Standards are outlined and specifications detailed. A statement of fifteen general pricniples for planning science facilities in secondary schools precedes a discussion of--(1) special facilities for different…

  1. Planning Requirements for Small School Facilities.

    ERIC Educational Resources Information Center

    Davis, J. Clark; McQueen, Robert

    The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…

  2. Two-Step Optimization for Spatial Accessibility Improvement: A Case Study of Health Care Planning in Rural China

    PubMed Central

    Luo, Jing; Tian, Lingling; Luo, Lei; Yi, Hong

    2017-01-01

    A recent advancement in location-allocation modeling formulates a two-step approach to a new problem of minimizing disparity of spatial accessibility. Our field work in a health care planning project in a rural county in China indicated that residents valued distance or travel time from the nearest hospital foremost and then considered quality of care including less waiting time as a secondary desirability. Based on the case study, this paper further clarifies the sequential decision-making approach, termed “two-step optimization for spatial accessibility improvement (2SO4SAI).” The first step is to find the best locations to site new facilities by emphasizing accessibility as proximity to the nearest facilities with several alternative objectives under consideration. The second step adjusts the capacities of facilities for minimal inequality in accessibility, where the measure of accessibility accounts for the match ratio of supply and demand and complex spatial interaction between them. The case study illustrates how the two-step optimization method improves both aspects of spatial accessibility for health care access in rural China. PMID:28484707

  3. Two-Step Optimization for Spatial Accessibility Improvement: A Case Study of Health Care Planning in Rural China.

    PubMed

    Luo, Jing; Tian, Lingling; Luo, Lei; Yi, Hong; Wang, Fahui

    2017-01-01

    A recent advancement in location-allocation modeling formulates a two-step approach to a new problem of minimizing disparity of spatial accessibility. Our field work in a health care planning project in a rural county in China indicated that residents valued distance or travel time from the nearest hospital foremost and then considered quality of care including less waiting time as a secondary desirability. Based on the case study, this paper further clarifies the sequential decision-making approach, termed "two-step optimization for spatial accessibility improvement (2SO4SAI)." The first step is to find the best locations to site new facilities by emphasizing accessibility as proximity to the nearest facilities with several alternative objectives under consideration. The second step adjusts the capacities of facilities for minimal inequality in accessibility, where the measure of accessibility accounts for the match ratio of supply and demand and complex spatial interaction between them. The case study illustrates how the two-step optimization method improves both aspects of spatial accessibility for health care access in rural China.

  4. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  5. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  6. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  7. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  8. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  9. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  10. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  11. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...

  12. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The owner...

  13. Disaster planning: the basics of creating a burn mass casualty disaster plan for a burn center.

    PubMed

    Kearns, Randy D; Conlon, Kathe M; Valenta, Andrea L; Lord, Graydon C; Cairns, Charles B; Holmes, James H; Johnson, Daryhl D; Matherly, Annette F; Sawyer, Dalton; Skarote, Mary Beth; Siler, Sean M; Helminiak, Radm Clare; Cairns, Bruce A

    2014-01-01

    In 2005, the American Burn Association published burn disaster guidelines. This work recognized that local and state assets are the most important resources in the initial 24- to 48-hour management of a burn disaster. Historical experiences suggest there is ample opportunity to improve local and state preparedness for a major burn disaster. This review will focus on the basics of developing a burn surge disaster plan for a mass casualty event. In the event of a disaster, burn centers must recognize their place in the context of local and state disaster plan activation. Planning for a burn center takes on three forms; institutional/intrafacility, interfacility/intrastate, and interstate/regional. Priorities for a burn disaster plan include: coordination, communication, triage, plan activation (trigger point), surge, and regional capacity. Capacity and capability of the plan should be modeled and exercised to determine limitations and identify breaking points. When there is more than one burn center in a given state or jurisdiction, close coordination and communication between the burn centers are essential for a successful response. Burn surge mass casualty planning at the facility and specialty planning levels, including a state burn surge disaster plan, must have interface points with governmental plans. Local, state, and federal governmental agencies have key roles and responsibilities in a burn mass casualty disaster. This work will include a framework and critical concepts any burn disaster planning effort should consider when developing future plans.

  14. Facility shows benefit of staying single.

    PubMed

    Baillie, Jonathan

    2010-08-01

    Construction of the new 513-bed PFI-funded hospital in Pembury near Tunbridge Wells in Kent, a pound 227 million acute healthcare facility that, on its completion in the autumn of 2011, will be the UK's first to offer 100% single-bed en suite accommodation, is ahead of schedule, "thanks to excellent teamwork and careful planning". During a visit to the now rapidly emerging healthcare facility, located in an Area of Outstanding Natural Beauty (AONB) in a wooded hillside location in the Weald of Kent which Nigel Keen, general manager for the PFI project company, described as "the most attractive site for a hospital I have ever worked on", HEJ editor Jonathan Baillie met key project personnel and discussed the impressive progress made to date.

  15. School Nutrition Facility Planning Guide.

    ERIC Educational Resources Information Center

    Pannell, Dorothy VanEgmond

    This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…

  16. The 1985 National Aeronautics and Space Administration's Summer High School Apprenticeship Research Program (SHARP)

    NASA Technical Reports Server (NTRS)

    1985-01-01

    In 1985, a total of 126 talented high school students gained first hand knowledge about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the sixth year of operation for NASA's Summer High School Apprenticeship Research Program (SHARP). The major priority of maintaining the high standards and success of prior years was satisfied. The following eight sites participated in the Program: Ames Research Center, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallop Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center. Tresp Associates served as the SHARP contractor and worked closely with NASA staff at headquarters and the sites just mentioned to plan, implement, and evaluate the program.

  17. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...

  18. 42 CFR 37.4 - Plans for chest roentgenographic examinations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... covered by the plan; (4) The name and location of the approved X-ray facility or facilities, and the... approval as the originally approved plan. (e) The operator must promptly display in a visible location on... NIOSH. The proposed plan or change in plan must remain posted in a visible location on the bulletin...

  19. 40 CFR 265.52 - Content of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...

  20. 40 CFR 265.52 - Content of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...

  1. 40 CFR 265.52 - Content of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...

  2. 40 CFR 265.52 - Content of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...

  3. 75 FR 78952 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; Commonwealth of Virginia... Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION... request for EPA withdrawal of its section 111(d)/129 plan (the plan) approval for HMIWI units. Submittal...

  4. Reliability of eye lens dosimetry in workers of a positron emission tomography radiopharmaceutical production facility.

    PubMed

    da Silva, Teógenes A; Guimarães, Margarete C; Meireles, Leonardo S; Teles, Luciana L D; Lacerda, Marco Aurélio S

    2016-11-01

    A new regulatory statement was issued concerning the eye lens radiation protection of persons in planned exposures. A debate was raised on the adequacy of the dosimetric quantity and on its method of measurement. The aim of this work was to establish the individual monitoring procedure with the EYE-D™ holder and a MCP-N LiF:Mg,Cu,P thermoluminescent chip detector for measuring the personal dose equivalent H p (3) in workers of a Positron Emission Tomography Radiopharmaceutical Production Facility. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1983-01-01

    The current work in progress for the SAGA project are described. The highlights of this research are: a parser independent SAGA editor, design for the screen editing facilities of the editor, delivery to NASA of release 1 of Olorin, the SAGA parser generator, personal workstation environment research, release 1 of the SAGA symbol table manager, delta generation in SAGA, requirements for a proof management system, documentation for and testing of the cyber pascal make prototype, a prototype cyber-based slicing facility, a June 1984 demonstration plan, SAGA utility programs, summary of UNIX software engineering support, and theorem prover review.

  6. TAC Proton Accelerator Facility: The Status and Road Map

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Algin, E.; Akkus, B.; Caliskan, A.

    2011-06-28

    Proton Accelerator (PA) Project is at a stage of development, working towards a Technical Design Report under the roof of a larger-scale Turkish Accelerator Center (TAC) Project. The project is supported by the Turkish State Planning Organization. The PA facility will be constructed in a series of stages including a 3 MeV test stand, a 55 MeV linac which can be extended to 100+ MeV, and then a full 1-3 GeV proton synchrotron or superconducting linac. In this article, science applications, overview, and current status of the PA Project will be given.

  7. Life Sciences Research Facility automation requirements and concepts for the Space Station

    NASA Technical Reports Server (NTRS)

    Rasmussen, Daryl N.

    1986-01-01

    An evaluation is made of the methods and preliminary results of a study on prospects for the automation of the NASA Space Station's Life Sciences Research Facility. In order to remain within current Space Station resource allocations, approximately 85 percent of planned life science experiment tasks must be automated; these tasks encompass specimen care and feeding, cage and instrument cleaning, data acquisition and control, sample analysis, waste management, instrument calibration, materials inventory and management, and janitorial work. Task automation will free crews for specimen manipulation, tissue sampling, data interpretation and communication with ground controllers, and experiment management.

  8. A planar reacting shear layer system for the study of fluid dynamics-combustion interaction

    NASA Technical Reports Server (NTRS)

    Marek, C. J.; Chang, C. T.; Ghorashi, B.; Wey, C. C.; Wey, C.; Mularz, E. J.

    1989-01-01

    A versatile planar reacting shear layer facility is constructed at NASA-Lewis. The research objectives, as well as design, instrumentations and the operational procedures developed for the system are described. The fundamental governing equations and the type of quantitative information that are needed from experiments are described. Additionally, a review of earlier work is presented. Whenever appropriate, comparisons are made with similar systems in other facilities and the main differences are described. Finally, the nonintrusive measurement techniques (PLIF, PMS, LDV, and Schlieren photography) and the type of experiments that are planned are described.

  9. Grupo de Trabajo Para la Preparacion del Proyecto Sobre el Desarrolo de Servicias de Bibliotecas y de Informacion Cientifica y Tecnica (Working Group for the Preparation of the Proposal on the Development of Library Services and Scientific and Technical Information).

    ERIC Educational Resources Information Center

    Oficina de Educacion Iberoamericana, Madrid (Spain).

    The Office of Iberoamerican Education, an intergovernmental body based on educational and cultural cooperation for the purpose of disseminating information, documentation, advice, and assistance in the field of education, co-sponsors (with UNESCO) the work represented in this study of library and information planning and facilities in the Andean…

  10. Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.

  11. Manufacturing Planning Guide

    NASA Technical Reports Server (NTRS)

    Waid, Michael

    2011-01-01

    Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  13. Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost

    NASA Technical Reports Server (NTRS)

    Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)

    1991-01-01

    This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.

  14. Formulation and preparation of Hanford Waste Treatment Plant direct feed low activity waste Effluent Management Facility core simulant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCabe, Daniel J.; Nash, Charles A.; Adamson, Duane J.

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Melter Off-Gas Condensate, LMOGC) from the off-gas system. The baseline plan for disposition of this stream during full WTP operations is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility. However, during the Direct Feed LAW (DFLAW) scenario, planned disposition of this stream is to evaporate it in a new evaporator in the Effluent Management Facility (EMF) and then return it tomore » the LAW melter. It is important to understand the composition of the effluents from the melter and new evaporator so that the disposition of these streams can be accurately planned and accommodated. Furthermore, alternate disposition of the LMOGC stream would eliminate recycling of problematic components, and would enable less integrated operation of the LAW melter and the Pretreatment Facilities. Alternate disposition would also eliminate this stream from recycling within WTP when it begins operations and would decrease the LAW vitrification mission duration and quantity of glass waste, amongst the other problems such a recycle stream present. This LAW Melter Off-Gas Condensate stream will contain components that are volatile at melter temperatures and are problematic for the glass waste form, such as halides and sulfate. Because this stream will recycle within WTP, these components accumulate in the Melter Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Diverting the stream reduces the halides and sulfate in the recycled Condensate and is a key outcome of this work. This overall program examines the potential treatment and immobilization of this stream to enable alternative disposal. The objective of this task was to formulate and prepare a simulant of the LAW Melter Off-gas Condensate expected during DFLAW operations. That simulant can be used in evaporator testing to predict the composition of the effluents from the Effluent Management Facility (EMF) evaporator to aid in planning for their disposition. This document describes the method used to formulate a simulant of this LAW Melter Off-Gas Condensate stream, which, after pH adjustment, is the feed to the evaporator in the EMF.« less

  15. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Network Performance Evaluation Model for assessing the impacts of high-occupancy vehicle facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janson, B.N.; Zozaya-Gorostiza, C.; Southworth, F.

    1986-09-01

    A model to assess the impacts of major high-occupancy vehicle (HOV) facilities on regional levels of energy consumption and vehicle air pollution emissions in urban aeas is developed and applied. This model can be used to forecast and compare the impacts of alternative HOV facility design and operation plans on traffic patterns, travel costs, model choice, travel demand, energy consumption and vehicle emissions. The model is designed to show differences in the overall impacts of alternative HOV facility types, locations and operation plans rather than to serve as a tool for detailed engineering design and traffic planning studies. The Networkmore » Performance Evaluation Model (NETPEM) combines several urban transportation planning models within a multi-modal network equilibrium framework including modules with which to define the type, location and use policy of the HOV facility to be tested, and to assess the impacts of this facility.« less

  17. Making PACS the present, not the future.

    PubMed

    Hunt, D

    1998-01-01

    Why haven't you moved forward with PACS? Have you just procrastinated or does your facility have legitimate reasons? Some say the technology is too confusing or too new, while others say the cost of PACS is too high. Many facilities say they haven't found a satisfactory way to deal with the conflicting opinions of their radiologists, IS department, administration, referring physicians and staff. Take time to compare the technology you do understand with something familiar such as your own PC or perhaps the current networks inside your facility. You'll soon begin to see that PACS is not a new technology, but rather a new methodology. To handle the perceived high cost of PACS, remember that every facility has different needs. Look at your work flow and then the many byproducts of PACS, such as marketing. If you are the first in your area to implement this new technology, you'll gain a marketing advantage in competing for referring physicians and managed care referral business. Follow the process you use to purchase other products, such as CT or MRI, as you investigate the vendors. Finally, make a plan! Determine departmental goals and gather information from vendors. Create a timeline, a financial plan and your marketing strategy. Together, these steps will help move PACS into the present for you.

  18. 40 CFR 80.1449 - What are the Production Outlook Report requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planned or underway, information on all the following, as available: (i) Strategic planning. (ii) Planning... and production processes to be used at each production facility. (iv) Changes to the facility that...

  19. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  20. Charter School Facilities: A Resource Guide on Development and Financing.

    ERIC Educational Resources Information Center

    Jakubowski, Lara

    This manual provides information to help charter schools navigate the facility development process, including worksheets that can be customized to suit a particular school's needs. Sections cover how facility planning fits into business planning for charter schools, review a process for assessing a school's facility needs, and summarize how to…

  1. 76 FR 9276 - Tank Vessel and Marine Transportation-Related Facility Response Plans for Hazardous Substances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...

  2. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Spill response plans for facilities located in...

  3. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  4. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... include new and existing small-scale wind energy facilities, such as single-turbine demonstration projects, as well as large, multi-turbine commercial wind facilities. Covered Species The planning partners are...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

  5. Results of an Initial Field Study of New Techniques for Citizen Participation in Educational Facilities Planning.

    ERIC Educational Resources Information Center

    Zucker, Charles B.

    The utility of a particular citizen participation planning approach as applied to educational facilities planning is described. With the aid of a clear-cut decisionmaking procedure, citizens could participate effectively in the development of specific planning policy statements. Such statements could be used to discuss planning priorities, focus…

  6. Integration of Biosafety into Core Facility Management

    PubMed Central

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.

  7. Availability and Quality of Family Planning Services in the Democratic Republic of the Congo: High Potential for Improvement

    PubMed Central

    Mpunga, Dieudonné; Lumbayi, JP; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert

    2017-01-01

    Objective: To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Methods: Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as “high” if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or “low” if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. Results: We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services (P<.001). Public facilities were less likely than private facilities to have high-quality services (P=.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Conclusion: Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. PMID:28588047

  8. Development of a plan for automating integrated circuit processing

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.

  9. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, Juan; Anderson, Art

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less

  10. Bioassay criteria for environmental restoration workers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, E.H.; Bihl, D.E.

    1993-01-01

    Environmental restoration (ER) work at the U. S. Department of Energy Hanford Site posed questions concerning when to perform bioassay monitoring of workers for potential intakes of radioactivity. Application of criteria originally developed for use inside radionuclide processing facilities to ER work resulted in overly restrictive bioassay requirements. ER work typically involves site characterization or, excavating large quantities of potentially contaminated soil, rather than working with concentrated quantities of radioactivity as in a processing facility. An improved approach, tailored to ER work, provided soil contamination concentrations above which worker bioassay would be required. Soil concentrations were derived assuming acute ormore » chronic intakes of 2% of an Annual Limit on Intake (ALI), or a potential committed effective dose equivalent of 100 mrem, and conservative dust loading of air from the work. When planning ER work, the anticipated soil concentration and corresponding need for bioassay could be estimated from work-site historical records. Once site work commenced, soil sampling and work-place surveys could be used to determine bioassay needs. This approach substantially reduced the required number of bioassay samples with corresponding reductions in analytical costs, schedules, and more flexible work-force management. (Work supported by the US Department of Energy under contract DOE-AC06-76RLO 1830.)« less

  11. Work Breakdown Structure (WBS) and WBS dictionary. [advanced x ray astrophysics facility (AXAF)

    NASA Technical Reports Server (NTRS)

    Cocuzzo, F.

    1994-01-01

    This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.

  12. 30 CFR 285.640 - What is a General Activities Plan (GAP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... conceptual decommissioning plans for all planned facilities, including testing of technology devices and... easements for the assessment and development of your limited lease or grant. (b) You must receive MMS...

  13. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  14. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  15. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  16. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  17. 33 CFR 154.1060 - Submission and approval procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for... to which this subpart applies shall submit one copy of a facility response plan meeting the... also required to prepare a response plan under 40 CFR part 112, if the COTP determines that the plan...

  18. 78 FR 21871 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... promulgated on May 10, 2006. Connecticut DEEP's State Plan is for implementing and enforcing provisions at... and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut; 111(d)/129 Revised State Plan for Large and Small Municipal Waste Combustors AGENCY: Environmental Protection Agency...

  19. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  20. Developing a plan for primary health care facilities in Soweto, South Africa. Part II: Applying locational criteria.

    PubMed

    Doherty, J; Rispel, L; Webb, N

    1996-12-01

    This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.

  1. Direct Write Printing on Thin and Flexible Substrates for Space Applications

    NASA Technical Reports Server (NTRS)

    Paquette, Beth

    2016-01-01

    This presentation describes the work done on direct-write printing conductive traces for a flexible detector application. A Repeatability Plan was established to define detector requirements, material and printer selections, printing facilities, and tests to verify requirements are met. Designs were created for the detector, and printed using an aerosol jet printer. Testing for requirement verification is ongoing.

  2. East Europe Report.

    DTIC Science & Technology

    1986-12-05

    and road building equipment manufactured by the Martin Heavy Engineering Plants, economic production unit [VHJ], one of our major suppliers, the...equipped with health care facilities, their major advantage is that they can be rapidly assembled and disassembled even under demanding field conditions... major crude oil pipelines. In the Seventh 5-Year Plan the Czechoslovak Freight Car Works, concern enterprise, in Poprad manufactured numerous BMPNS

  3. Specifications of a Simulation Model for a Local Area Network Design in Support of a Stock Point Logistics Integrated Communication Environment (SPLICE).

    DTIC Science & Technology

    1983-06-01

    constrained at each step. Use of dis- crete simulation can be a powerful tool in this process if its role is carefully planned. The gross behavior of the...by projecting: - the arrival of units of work at SPLICE processing facilities (workload analysis) . - the amount of processing resources comsumed in

  4. Getting to MARS: Working with an Automated Retrieval System in the Special Collections Department at the University of Nevada, Reno

    ERIC Educational Resources Information Center

    Sundstrand, Jacquelyn K.

    2011-01-01

    The University of Nevada, Reno's Special Collections and University Archives Department moved into a new facility and had to utilize an automated storage and retrieval systems (ASRS) for storage of manuscript and archival collections. Using ASRS bins presented theoretical challenges in planning for the move. This article highlights how well the…

  5. Applying APPA Guidelines for Custodial Staffing: The Case of Slippery Rock University

    ERIC Educational Resources Information Center

    Iossifova, Albena; Hemphill, Dennis; Brest, Diana; Albert, Scott

    2009-01-01

    Founded in 1889, Slippery Rock University (SRU) is a state university with 8,500 students and 400 faculty. Facilities and planning (F&P) employs 178 staff, of which 50 are custodians. F&P is responsible for the maintenance of 560 acres and 60 major buildings that comprise approximately 2.3 million gross square feet. Currently work is…

  6. 77 FR 50165 - Escape and Evacuation Plans for Surface Coal Mines, Surface Facilities and Surface Work Areas of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    .... This program helps to assure that requested data can be provided in the desired format, reporting... package expires on January 31, 2013. DATES: All comments must be postmarked or received by midnight... instructed in the procedures to follow should a fire occur. MSHA has updated the data with respect to the...

  7. Astronaut Thuot and Gemar work with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Astronauts Pierre J. Thuot (top) and Charles D. (Sam) Gemar show off the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the non-linear gravity-dependent behavior of two types of space hardware - large space structures (as depicted here) and contained fluids - planned for future spacecraft.

  8. NASA Administrator James Webb and Lewis Director Abe Silverstein

    NASA Image and Video Library

    1961-12-21

    National Aeronautics and Space Administration (NASA) Administrator James Webb toured the new Plum Brook Reactor Facility in December 1961 with Abe Silverstein, the newly appointed Director of the Lewis Research Center. The 60-megawatt test reactor was built on 500 acres of the former Plum Brook Ordnance Works in Sandusky, Ohio. After nearly five years of construction, the facility went critical for the first time in June 1961. In late 1957 Hugh Dryden requested Silverstein’s assistance in creating the new space agency. After several months of commuting, Silverstein transferred to Headquarters in May 1958. Silverstein was a critical member of a team that devised a fiscal year 1960 budget and began planning missions. When NASA officially began operation on October 1, 1958, Silverstein was third in command. He directed mission planning, spacecraft design, launch operations, manned space missions, and unmanned probes. James Webb, named NASA administrator on January 7, 1961, sought to have those working on Apollo at the NASA centers report to a new Headquarters program office, not to the head of the Apollo Program. Silverstein requested to be appointed to the vacant center director position in Cleveland. He officially returned as director of the Lewis Research Center on November 1, 1961.

  9. Medicare Advantage Members' Expected Out-Of-Pocket Spending For Inpatient And Skilled Nursing Facility Services.

    PubMed

    Keohane, Laura M; Grebla, Regina C; Mor, Vincent; Trivedi, Amal N

    2015-06-01

    Inpatient and skilled nursing facility (SNF) cost sharing in Medicare Advantage (MA) plans may reduce unnecessary use of these services. However, large out-of-pocket expenses potentially limit access to care and encourage beneficiaries at high risk of needing inpatient and postacute care to avoid or leave MA plans. In 2011 new federal regulations restricted inpatient and skilled nursing facility cost sharing and mandated limits on out-of-pocket spending in MA plans. After these regulations, MA members in plans with low premiums averaged $1,758 in expected out-of-pocket spending for an episode of seven hospital days and twenty skilled nursing facility days. Among members with the same low-premium plan in 2010 and 2011, 36 percent of members belonged to plans that added an out-of-pocket spending limit in 2011. However, these members also had a $293 increase in average cost sharing for an inpatient and skilled nursing facility episode, possibly to offset plans' expenses in financing out-of-pocket limits. Some MA beneficiaries may still have difficulty affording acute and postacute care despite greater regulation of cost sharing. Project HOPE—The People-to-People Health Foundation, Inc.

  10. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  13. Systems Engineering Simulator (SES) Simulator Planning Guide

    NASA Technical Reports Server (NTRS)

    McFarlane, Michael

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  14. Computational Electromagnetics (CEM) Laboratory: Simulation Planning Guide

    NASA Technical Reports Server (NTRS)

    Khayat, Michael A.

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CEM Laboratory. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  15. Space station systems analysis study. Part 1, volume 1: Executive study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Potential space station system options were examined for a permanent, manned, orbital space facility and to provide data to NASA program planners and decision makers for their use in future program planning. There were ten space station system objectives identified. These were categorized into five major objectives and five supporting objectives. The major objectives were to support the development of: (1) satellite power systems, (2) nuclear energy plants in space, (3) space processing, (4) earth services, and (5) space cosmological research and development. The five supporting objectives, to define space facilities which would be basic building blocks for future systems, were: (1) a multidiscipline science laboratory, (2) an orbital depot to maintain, fuel, and service orbital transfer vehicles, (3) cluster support systems to provide power and data processing for multiple orbital elements, (4) a sensor development facility, and (5) the facilities necessary to enhance man's living and working in space.

  16. United Space Alliance LLC Parachute Refurbishment Facility Model

    NASA Technical Reports Server (NTRS)

    Esser, Valerie; Pessaro, Martha; Young, Angela

    2007-01-01

    The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.

  17. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  18. Some new astronomical facilities in China

    NASA Astrophysics Data System (ADS)

    Wang, Shouguan

    1989-10-01

    For the 1990's, plans for some astronomical facilities and related research are being carried out in China. This report describes in some detail plans for radio astronomical facilities, a 150/220 cm Schmidt telescope, and experiments on a porcelain mirror material.

  19. JESS facility modification and environmental/power plans

    NASA Technical Reports Server (NTRS)

    Bordeaux, T. A.

    1984-01-01

    Preliminary plans for facility modifications and environmental/power systems for the JESS (Joint Exercise Support System) computer laboratory and Freedom Hall are presented. Blueprints are provided for each of the facilities and an estimate of the air conditioning requirements is given.

  20. Getting Started in the Child Care Business.

    ERIC Educational Resources Information Center

    Kimery, Sharon

    This pamphlet discusses questions to consider when planning a child care facility. Topics discussed include licensing, financial management, written policies on facility operation, recordkeeping, insurance, the physical nature of the facility, program planning, scheduling of daily activities, personnel selection, staff development, parent…

  1. Sports Facilities, Shopping Centers or Homes: What Locations are Important for Adults' Physical Activity? A Cross-Sectional Study.

    PubMed

    Jansen, Marijke; Ettema, Dick; Pierik, Frank; Dijst, Martin

    2016-03-04

    Physical activity (PA) is influenced by the built environment. However, little is known about the types of built environment where adults spend their time, and at what levels of PA they engage in those environments. Understanding the effect of the built environment on PA requires insight into PA behavior at different types of locations (e.g., home, work, shopping centers, and sports facilities). Therefore, this study describes where adults aged 45-65 years were active with moderate-to-vigorous intensity (MVPA), and examines associations of socio-demographic factors and neighborhood with MVPA at these locations. Participants' (N = 308) PA was measured for seven days using accelerometers and GPS-devices. Adults spent most minutes of MVPA at home and work. Highest MVPA-ratios of total time spent at a location were achieved in sports facilities and during transport. Neighborhood characteristics and socio-demographic factors such as work status, health status and household structure, had significant effects on MVPA at various locations and on total MVPA. Understanding PA behavior at various locations may provide insights that allow professionals in different domains (e.g., health, landscaping, urban planning) to develop strategies to stimulate PA.

  2. Sports Facilities, Shopping Centers or Homes: What Locations are Important for Adults’ Physical Activity? A Cross-Sectional Study

    PubMed Central

    Jansen, Marijke; Ettema, Dick; Pierik, Frank; Dijst, Martin

    2016-01-01

    Physical activity (PA) is influenced by the built environment. However, little is known about the types of built environment where adults spend their time, and at what levels of PA they engage in those environments. Understanding the effect of the built environment on PA requires insight into PA behavior at different types of locations (e.g., home, work, shopping centers, and sports facilities). Therefore, this study describes where adults aged 45–65 years were active with moderate-to-vigorous intensity (MVPA), and examines associations of socio-demographic factors and neighborhood with MVPA at these locations. Participants’ (N = 308) PA was measured for seven days using accelerometers and GPS-devices. Adults spent most minutes of MVPA at home and work. Highest MVPA-ratios of total time spent at a location were achieved in sports facilities and during transport. Neighborhood characteristics and socio-demographic factors such as work status, health status and household structure, had significant effects on MVPA at various locations and on total MVPA. Understanding PA behavior at various locations may provide insights that allow professionals in different domains (e.g., health, landscaping, urban planning) to develop strategies to stimulate PA. PMID:26959041

  3. A Guide for Planning Facilities for Occupational Preparation Programs for Dental Laboratory Technicians. Research Series No. 34.

    ERIC Educational Resources Information Center

    Macconnell, James D., And Others

    The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…

  4. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  5. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  6. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Spill response plans for facilities located in...

  7. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Spill response plans for facilities located in...

  8. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Spill response plans for facilities located in...

  9. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Spill response plans for facilities located in...

  10. A summary of existing and planned experiment hardware for low-gravity fluids research

    NASA Technical Reports Server (NTRS)

    Hill, Myron E.; Omalley, Terence F.

    1991-01-01

    An overview is presented of (1) existing ground-based, low gravity research facilities, with examples of hardware capabilities, and (2) existing and planned space-based research facilities, with examples of current and past flight hardware. Low-gravity, ground-based facilities, such as drop towers and aircraft, provide the experimenter with quick turnaround time, easy access to equipment, gravity levels ranging from 10(exp -2) to 10(exp -6) G, and low-gravity durations ranging from 2 to 30 sec. Currently, the only operational space-based facility is the Space Shuttle. The Shuttle's payload bay and middeck facilities are described. Existing and planned low-gravity fluids research facilities are also described with examples of experiments and hardware capabilities.

  11. Applications of Modeling and Simulation for Flight Hardware Processing at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Marshall, Jennifer L.

    2010-01-01

    The Boeing Design Visualization Group (DVG) is responsible for the creation of highly-detailed representations of both on-site facilities and flight hardware using computer-aided design (CAD) software, with a focus on the ground support equipment (GSE) used to process and prepare the hardware for space. Throughout my ten weeks at this center, I have had the opportunity to work on several projects: the modification of the Multi-Payload Processing Facility (MPPF) High Bay, weekly mapping of the Space Station Processing Facility (SSPF) floor layout, kinematics applications for the Orion Command Module (CM) hatches, and the design modification of the Ares I Upper Stage hatch for maintenance purposes. The main goal of each of these projects was to generate an authentic simulation or representation using DELMIA V5 software. This allowed for evaluation of facility layouts, support equipment placement, and greater process understanding once it was used to demonstrate future processes to customers and other partners. As such, I have had the opportunity to contribute to a skilled team working on diverse projects with a central goal of providing essential planning resources for future center operations.

  12. Fifteen-foot diameter modular space station Kennedy Space Center launch site support definition (space station program Phase B extension definition)

    NASA Technical Reports Server (NTRS)

    Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V

    1971-01-01

    This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.

  13. Kennedy Space Center Spaceport Analysis

    NASA Technical Reports Server (NTRS)

    Wary, Samantha A.

    2013-01-01

    Until the Shuttle Atlantis' final landing on July 21, 2011, Kennedy Space Center (KSC) served as NASA's main spaceport, which is a launch and landing facility for rockets and spacecraft that are attempting to enter orbit. Many of the facilities at KSC were created to assist the Shuttle Program. One of the most important and used facilities is the Shuttle Landing Facility (SLF), This was the main landing area for the return of the shuttle after her mission in space. · However, the SLF has also been used for a number of other projects including straight-line testing by Gibbs Racing, weather data collection by NOAA, and an airfield for the KSC helicopters. This runway is three miles long with control tower at midfield and a fire department located at the end in care of an emergency. This facility, which was part of the great space race, will continue to be used for historical events as Kennedy begins to commercialize its facilities. KSC continues to be an important spaceport to the government, and it will transform into an important spaceport for the commercial industry as well. During my internship at KSC's Center Planning and Development Directorate, I had the opportunity to be a part of the negotiation team working on the agreement for Space Florida to control the Shuttle Landing Facility. This gave me the opportunity to learn about all the changes that are occurring here at Kennedy Space Center. Through various meetings, I discovered the Master Plan and its focus is to transform the existing facilities that were primarily used for the Shuttle Program, to support government operations and commercial flights in the future. This. idea is also in a new strategic business plan and completion of a space industry market analysis. All of these different documentations were brought to my attention and I. saw how they came together in the discussions of transitioning the SLF to a commercial operator, Space Florida. After attending meetings and partaking in discussions for the SLF Agreement, I formed the idea of a Spaceport Analysis as my over internship project. As previously stated, I had the opportunity to sit in on the market analysis meetings and read through the analysis itself. I suggested the creation of a Strengths Weaknesses Opportunities Threats (SWOT) analysis, which allows an individual to see an overview of the company's strengths and weaknesses alongside any industry opportunities and threats. After discussions with the lead writer of the new strategic business plan and getting approval, I took the action upon myself and created the Kennedy Space Center SWOT Analysis.

  14. Commercial involvement in the development of space-based plant growing technology

    NASA Astrophysics Data System (ADS)

    Bula, R. J.; Tibbitts, T. W.; Morrow, R. C.; Dinauer, W. R.

    1992-07-01

    Considerable technological progress has been made in the development of controlled environment facilities for plant growth. Although not all of the technology used for terrestrial facilities is applicable to space-based plant growth facilities, the information resident in the commercial organizations that market these facilities can provide a significant resource for the development of the plant growing component of a CELSS. In 1985, NASA initiated an effort termed the Centers for the Commercial Development of Space (CCDS). This program endeavors to develop cooperative research and technology development programs with industrial companies that capitalize on the strengths of industry-university working relationships. One of the these CCDSs, the Wisconsin Center for Space Automation and Robotics (WCSAR), deals with developing automated plant growth facilities for space, in cooperation with several industrial partners. Concepts have been developed with industrial partners for the irradiation, water and nutrient delivery, nutrient composition control and automation and robotics subsystems of plant growing units. Space flight experiments are planned for validation of the concepts in a space environment.

  15. Commercial involvement in the development of space-based plant growing technology.

    PubMed

    Bula, R J; Tibbitts, T W; Morrow, R C; Dinauer, W R

    1992-01-01

    Considerable technological progress has been made in the development of controlled environment facilities for plant growth. Although not all of the technology used for terrestrial facilities is applicable to space-based plant growth facilities, the information resident in the commercial organizations that market these facilities can provide a significant resource for the development of the plant growing component of a CELSS. In 1985, NASA initiated an effort termed the Centers for the Commercial Development of Space (CCDS). This program endeavors to develop cooperative research and technology development programs with industrial companies that capitalize on the strengths of industry-university working relationships. One of the these CCDSs, the Wisconsin Center for Space Automation and Robotics (WCSAR), deals with developing automated plant growth facilities for space, in cooperation with several industrial partners. Concepts have been developed with industrial partners for the irradiation, water and nutrient delivery, nutrient composition control and automation and robotics subsystems of plant growing units. Space flight experiments are planned for validation of the concepts in a space environment.

  16. Certification of Plutonium Standards for KAMS Neutron Multiplicity Counter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salaymeh, S.R.

    2002-05-31

    As part of the implementation of the PEIS record of decision in January of 1997, DOE will pursue two technologies to disposition fifty metric tons of its stockpile of plutonium. As a result of this and in order to expedite the closure of Rocky Flats Environmental Technology Site in Colorado, DOE decided to use existing facilities at the Savannah River Site (SRS) for storing all material containing plutonium at KAMS. A neutron multiplicity counter was designed and built to carry out receipt verification measurement at the facility. Since the material covers a wide range and different levels of impurities, itmore » is essential that we obtain a set of working standards. An agreement was drafted to select the first drums to be these standards. A plan was developed for the certification of these standards using Rocky Flat's existing nondestructive assay equipment. This paper will discuss the types of materials to be shipped to SRS, number of standards to certify for each type of material, and the certification plan. It will also discuss the activities necessary to determine the nuclear content of these working standards to be used at SRS facilities in support of shipment and receipt of the Pu containing materials. Definition of instrument qualifications, measurement control processes, measurement methodologies, and calculations necessary to report the gram quantities and their uncertainties for plutonium, americium-241, uranium-235 (if present) and neptunium-237 (if present) will also be presented.« less

  17. 29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVEGRADE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVE-GRADE FLOOR LEVEL. INEEL DRAWING NUMBER 200-0633-00-287-106354. FLUOR NUMBER 5775-CPP-633-A-4. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  18. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the...) Being discharged from publicly funded institutions and systems of care, such as health-care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and...

  19. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the...) Being discharged from publicly funded institutions and systems of care, such as health-care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and...

  20. Sex workers in Vietnam: how many, how risky?

    PubMed

    Minh, Truong Tan; Nhan, Do Thi; West, Gary R; Durant, Tonji M; Jenkins, Richard A; Huong, Pham Thi; Valdiserri, Ronald O

    2004-10-01

    Because of concerns for HIV risks and need to plan effective programs, we assessed the number and risks of sex workers in Nha Trang City, Vietnam. Sex workers were contacted in streets, beaches, bars, and restaurants, and a capture-recapture method was used to estimate their number. An estimated 444 women worked on the streets and beach ("direct" sex workers) and 486 worked in bars and restaurants or other facilities ("indirect" sex workers). Direct and indirect sex workers engaged in sex work primarily to support their families. Direct sex workers were older and were more at risk for HIV risk than were indirect sex workers. Direct sex workers had more clients, were less likely to report always using condoms (67% vs. 81%), more likely to report a prior sexually transmitted infection (19% vs. 16%), and more likely to have clients who inject drugs (16% vs. 13%). This assessment has implications for planning programs to reduce sex work and its risks in Vietnam and potentially other countries.

  1. Argonne Physics Division - ATLAS

    Science.gov Websites

    Strategic Plan (2014) ATLAS Gus Savard Guy Savard, Director of ATLAS Welcome to ATLAS, the Argonne Tandem users. ATLAS mission statement and strategic plan guide the operation of the facility. The strategic plan defines the facilities main goals and is aligned with the US Nuclear Physics long-range plan

  2. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  3. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  4. 30 CFR 254.30 - When must I revise my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.30 When must I revise my response plan... the oil spill removal organizations cited in the plan; or (4) There is a significant change to the...

  5. Is the closest facility the one actually used? An assessment of travel time estimation based on mammography facilities.

    PubMed

    Alford-Teaster, Jennifer; Lange, Jane M; Hubbard, Rebecca A; Lee, Christoph I; Haas, Jennifer S; Shi, Xun; Carlos, Heather A; Henderson, Louise; Hill, Deirdre; Tosteson, Anna N A; Onega, Tracy

    2016-02-18

    Characterizing geographic access depends on a broad range of methods available to researchers and the healthcare context to which the method is applied. Globally, travel time is one frequently used measure of geographic access with known limitations associated with data availability. Specifically, due to lack of available utilization data, many travel time studies assume that patients use the closest facility. To examine this assumption, an example using mammography screening data, which is considered a geographically abundant health care service in the United States, is explored. This work makes an important methodological contribution to measuring access--which is a critical component of health care planning and equity almost everywhere. We analyzed one mammogram from each of 646,553 women participating in the US based Breast Cancer Surveillance Consortium for years 2005-2012. We geocoded each record to street level address data in order to calculate travel time to the closest and to the actually used mammography facility. Travel time between the closest and the actual facility used was explored by woman-level and facility characteristics. Only 35% of women in the study population used their closest facility, but nearly three-quarters of women not using their closest facility used a facility within 5 min of the closest facility. Individuals that by-passed the closest facility tended to live in an urban core, within higher income neighborhoods, or in areas where the average travel times to work was longer. Those living in small towns or isolated rural areas had longer closer and actual median drive times. Since the majority of US women accessed a facility within a few minutes of their closest facility this suggests that distance to the closest facility may serve as an adequate proxy for utilization studies of geographically abundant services like mammography in areas where the transportation networks are well established.

  6. Design of patient rooms and automatic radioiodine-131 waste water management system for a thyroid cancer treatment ward: 'Suandok Model'.

    PubMed

    Vilasdechanon, N; Ua-Apisitwong, S; Chatnampet, K; Ekmahachai, M; Vilasdechanon, J

    2014-09-01

    The great benefit of (131)I radionuclide treatment for differentiated thyroid cancer (DTC) was acknowledged by the long survival rate. The main requirements for (131)I therapy in hospital were treatment facilities and a radiation safety plan that assured radiation protection and safety to patient, hospital worker, public, and environment. To introduce the concepts and methods of radiation safety design for a patient's room in a (131)I treatment ward and a system of radioactive waste water management in hospital. The design was based on principles of external and internal radiation protection for unsealed source and radioactive waste management. Planning for treatment facilities was concluded from clinical evidence, physical and physiological information for (131)I, radiation safety criteria, hospital resources and budget. The three phases of the working process were: construction, software development, and radiation safety assessment. The (131)I treatment facility and automatic radioactive waste water management system was completely implemented in 2009. The radiation waste water management system known as the 'Suandok Model' was highly recommended by the national regulator to hospitals who desire to provide (131)I treatment for thyroid cancer. In 2011, the Nuclear Medicine Division, Chiang Mai University was rewarded by the national authority for a very good radiation practice in development of safe working conditions and environment. The Suandok Model was a facility design that fulfilled requirements for the safe use of high radiation (131)I doses for thyroid cancer treatment in hospital. The facility presented in this study may not be suitable for all hospitals but the design concepts could be applied according to an individual hospital context and resources. People who use or gain benefit from radiation applications have to emphasise the responsibility to control and monitor radiation effects on individuals, communities and the environment.

  7. A Sketch of the Taiwan Zebrafish Core Facility.

    PubMed

    You, May-Su; Jiang, Yun-Jin; Yuh, Chiou-Hwa; Wang, Chien-Ming; Tang, Chih-Hao; Chuang, Yung-Jen; Lin, Bo-Hung; Wu, Jen-Leih; Hwang, Sheng-Ping L

    2016-07-01

    In the past three decades, the number of zebrafish laboratories has significantly increased in Taiwan. The Taiwan Zebrafish Core Facility (TZCF), a government-funded core facility, was launched to serve this growing community. The Core Facility was built on two sites, one located at the National Health Research Institutes (NHRI, called Taiwan Zebrafish Core Facility at NHRI or TZeNH) and the other is located at the Academia Sinica (Taiwan Zebrafish Core Facility at AS a.k.a. TZCAS). The total surface area of the TZCF is about 180 m(2) encompassing 2880 fish tanks. Each site has a separate quarantine room and centralized water recirculating systems, monitoring key water parameters. To prevent diseases, three main strategies have been implemented: (1) imported fish must be quarantined; (2) only bleached embryos are introduced into the main facilities; and (3) working practices were implemented to minimize pathogen transfer between stocks and facilities. Currently, there is no health program in place; however, a fourth measure for the health program, specific regular pathogen tests, is being planned. In March 2015, the TZCF at NHRI has been AAALAC accredited. It is our goal to ensure that we provide "disease-free" fish and embryos to the Taiwanese research community.

  8. Health Care Facilities Resilient to Climate Change Impacts

    PubMed Central

    Paterson, Jaclyn; Berry, Peter; Ebi, Kristie; Varangu, Linda

    2014-01-01

    Climate change will increase the frequency and magnitude of extreme weather events and create risks that will impact health care facilities. Health care facilities will need to assess climate change risks and adopt adaptive management strategies to be resilient, but guidance tools are lacking. In this study, a toolkit was developed for health care facility officials to assess the resiliency of their facility to climate change impacts. A mixed methods approach was used to develop climate change resiliency indicators to inform the development of the toolkit. The toolkit consists of a checklist for officials who work in areas of emergency management, facilities management and health care services and supply chain management, a facilitator’s guide for administering the checklist, and a resource guidebook to inform adaptation. Six health care facilities representing three provinces in Canada piloted the checklist. Senior level officials with expertise in the aforementioned areas were invited to review the checklist, provide feedback during qualitative interviews and review the final toolkit at a stakeholder workshop. The toolkit helps health care facility officials identify gaps in climate change preparedness, direct allocation of adaptation resources and inform strategic planning to increase resiliency to climate change. PMID:25522050

  9. Definition of ground test for verification of large space structure control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    1994-01-01

    Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

  10. A/R systems reduce delayed and denied reimbursements.

    PubMed

    Escobar, Carlos

    2007-01-01

    The day-to-day benefits of a comprehensive billing and collections system are pro-active and preventive--administrators are increasingly learning that accelerating billings hastens collections and, ultimately, facility profitability. Effective billing and collections management services work closely with the facility, matching nightly "dumps" of patient files with transcripts. This marriage of otherwise disparate data creates a billing unit that reduces errors and ensures no billable procedures are lost. Ultimately, the goal of any medical practice that engages an ASP application or outsource solution is not to sit idly by while allowing a billing company to take control of a practice's revenue stream. The ability to track the billing process from transcript submission to payment provides a facility with all information necessary to manage cash flow, revenues, and even personal and practice financial planning.

  11. International theme for seaside event.

    PubMed

    Adie, Kate; Whitehorn, Will

    2014-05-01

    The organisers of this month's HefmA 2014 annual conference and exhibition promise delegates "the opportunity to hear international perspectives on the current issues facing the worldwide 'family' of health estates and facilities professionals". Conference speakers will include a US-based consultant architect discussing 'a transformational change programme which has achieved up to threefold greater throughput using the existing footprint in a US Emergency Department'; the assistant director, Facilities Services, at Health Facilities Scotland, focusing on HFS's work to ensure high training standards and succession planning, former BBC war correspondent, Kate Adie, describing some of the 'extraordinary experiences' of an eventful career, and Will Whitehorn, a former search-and-rescue helicopter crewman, who later became president of 'the world's first commercial spaceline', Virgin Galactic, giving his view on technology's impact in business.

  12. Summer High School Apprenticeship Research Program (SHARP) of the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    1984-01-01

    A total of 125 talented high school students had the opportunity to gain first hand experience about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the fifth year of operation for NASA's Summer High School Apprenticehsip Research Program (SHARP). Ferguson Bryan served as the SHARP contractor and worked closely with NASA staff at Headquarters and the eight participating sites to plan, implement, and evaluate the Program. The main objectives were to strengthen SHARP and expand the number of students in the Program. These eight sites participated in the Program: Ames Research Center North, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallops Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center.

  13. Spill Prevention, Control, and Countermeasure (SPCC) for the Upstream (Oil Exploration and Production) Sector

    EPA Pesticide Factsheets

    The SPCC rule requires facilities to develop, maintain, and implement an oil spill prevention plan, called an SPCC Plan. These plans help facilities prevent oil spill, as well as control a spill should one occur.

  14. 40 CFR 49.146 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Implementation Plan for Oil and Natural Gas Production Facilities, Fort Berthold Indian... the oil and natural gas production facility each time the oil is unloaded from the produced oil...

  15. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  16. Planning and Equipping a New Machine Shop

    ERIC Educational Resources Information Center

    Bloom, Nick

    1978-01-01

    The author describes the planning and equipping of a new machine shop facility at the East Los Angeles Occupational Center. Lists of machine shop and classroom equipment, a floor plan of the facility, and some new shop curriculum approaches are included. (MF)

  17. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  18. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  19. Structural and Functional Concepts in Current Mouse Phenotyping and Archiving Facilities

    PubMed Central

    Kollmus, Heike; Post, Rainer; Brielmeier, Markus; Fernández, Julia; Fuchs, Helmut; McKerlie, Colin; Montoliu, Lluis; Otaegui, Pedro J; Rebelo, Manuel; Riedesel, Hermann; Ruberte, Jesús; Sedlacek, Radislav; de Angelis, Martin Hrabě; Schughart, Klaus

    2012-01-01

    Collecting and analyzing available information on the building plans, concepts, and workflow from existing animal facilities is an essential prerequisite for most centers that are planning and designing the construction of a new animal experimental research unit. Here, we have collected and analyzed such information in the context of the European project Infrafrontier, which aims to develop a common European infrastructure for high-throughput systemic phenotyping, archiving, and dissemination of mouse models. A team of experts visited 9 research facilities and 3 commercial breeders in Europe, Canada, the United States, and Singapore. During the visits, detailed data of each facility were collected and subsequently represented in standardized floor plans and descriptive tables. These data showed that because the local needs of scientists and their projects, property issues, and national and regional laws require very specific solutions, a common strategy for the construction of such facilities does not exist. However, several basic concepts were apparent that can be described by standardized floor plans showing the principle functional units and their interconnection. Here, we provide detailed information of how individual facilities addressed their specific needs by using different concepts of connecting the principle units. Our analysis likely will be valuable to research centers that are planning to design new mouse phenotyping and archiving facilities. PMID:23043807

  20. 42 CFR 456.522 - Content of request for variance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time... travel time between the remote facility and each facility listed in paragraph (e) of this section; (f...

  1. 31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR AT MEZZANINE AND LOWER LEVELS. INEEL DRAWING NUMBER 200-0633-00-287-106352. FLUOR NUMBER 5775-CPP-633-A-2. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  2. Laboratory security and emergency response guidance for laboratories working with select agents. Centers for Disease Control and Prevention.

    PubMed

    Richmond, Jonathan Y; Nesby-O'Dell, Shanna L

    2002-12-06

    In recent years, concern has increased regarding use of biologic materials as agents of terrorism, but these same agents are often necessary tools in clinical and research microbiology laboratories. Traditional biosafety guidelines for laboratories have emphasized use of optimal work practices, appropriate containment equipment, well-designed facilities, and administrative controls to minimize risk of worker injury and to ensure safeguards against laboratory contamination. The guidelines discussed in this report were first published in 1999 (U.S. Department of Health and Human Services/CDC and National Institutes of Health. Biosafety in microbiological and biomedical laboratories [BMBL]. Richmond JY, McKinney RW, eds. 4th ed. Washington, DC: US Department of Health and Human Services, 1999 [Appendix F]). In that report, physical security concerns were addressed, and efforts were focused on preventing unauthorized entry to laboratory areas and preventing unauthorized removal of dangerous biologic agents from the laboratory. Appendix F of BMBL is now being revised to include additional information regarding personnel risk assessments, and inventory controls. The guidelines contained in this report are intended for laboratories working with select agents under biosafety-level 2, 3, or 4 conditions as described in Sections II and III of BMBL. These recommendations include conducting facility risk assessments and developing comprehensive security plans to minimize the probability of misuse of select agents. Risk assessments should include systematic, site-specific reviews of 1) physical security; 2) security of data and electronic technology systems; 3) employee security; 4) access controls to laboratory and animal areas; 5) procedures for agent inventory and accountability; 6) shipping/transfer and receiving of select agents; 7) unintentional incident and injury policies; 8) emergency response plans; and 9) policies that address breaches in security. The security plan should be an integral part of daily operations. All employees should be well-trained and equipped, and the plan should be reviewed annually, at least.

  3. Space Weather Modeling at the Community Coordinated Modeling Center

    NASA Technical Reports Server (NTRS)

    Hesse M.

    2005-01-01

    The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership, which aims at the creation of next generation space weather models. The goal of the CCMC is to support the research and developmental work necessary to substantially increase the present-day modeling capability for space weather purposes, and to provide models for transition to the rapid prototyping centers at the space weather forecast centers. This goal requires dose collaborations with and substantial involvement of the research community. The physical regions to be addressed by CCMC-related activities range from the solar atmosphere to the Earth's upper atmosphere. The CCMC is an integral part of the National Space Weather Program Implementation Plan, of NASA's Living With a Star (LWS) initiative, and of the Department of Defense Space Weather Transition Plan. CCMC includes a facility at NASA Goddard Space Flight Center, as well as distributed computing facilities provided by the US Air Force. CCMC also provides, to the research community, access to state-of-the-art space research models. In this paper we will provide updates on CCMC status, on current plans, research and development accomplishments and goals, and on the model testing and validation process undertaken as part of the CCMC mandate. Special emphasis will be on solar and heliospheric models currently residing at CCMC, and on plans for validation and verification.

  4. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  5. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  6. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. An Overview of the Microgravity Science Glovebox (MSG) Facility and the Research Performed in the MSG on the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Spivey, Reggie; Flores, Ginger N.

    2009-01-01

    The Microgravity Science Glovebox (MSG) is a double rack facility aboard the International Space Station (ISS) designed for investigation handling. The MSG has been operating on the ISS since July 2002 and is currently located in the Columbus Laboratory Module. The unique design of the facility allows it to accommodate science and technology investigations in a workbench type environment. The facility has an enclosed working volume that is held at a negative pressure with respect to the crew living area. This allows the facility to provide two levels of containment for small parts, particulates, fluids, and gases. This containment approach protects the crew from possible hazardous operations that take place inside the MSG work volume. Research investigations operating inside the MSG are provided a large 255 liter enclosed work space, 1000 watts of dc power via a versatile supply interface (120, 28, +/- 12, and 5 Vdc), 1000 watts of cooling capability, video and data recording and real time downlink, ground commanding capabilities, access to ISS Vacuum Exhaust and Vacuum Resource Systems, and gaseous nitrogen supply. These capabilities make the MSG one of the most utilized facilities on ISS. In fact, the MSG has been used for over 5000 hours of scientific payload operations. MSG investigations involve research in cryogenic fluid management, fluid physics, spacecraft fire safety, materials science, combustion, plant growth, and life support technologies. MSG is an ideal platform for science investigations and research required to advance the technology readiness levels (TRLs) applicable to the Constellation Program. This paper will provide an overview of the MSG facility, a synopsis of the research that has already been accomplished in the MSG, an overview of future investigations currently planned for operation in the MSG, and potential applications of MSG investigations that can provide useful data to the Constellation Program. In addition, this paper will address the role of the MSG facility in the ISS National Lab.

  9. KSC-03PD-2390

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Japanese girls from Urawa Daiichi Girls High School, Urawa, Japan, pose for a group photo on their visit to the Spacehab facility in Cape Canaveral, Fla. They were awarded the trip when their experiments were chosen to fly on mission STS-107. The group was also meeting with American students from Melbourne and Jacksonville, Fla. The girls planned a floral tribute at the STS-107 memorial stone at the facility. The National Space Development Agency of Japan (NASDA) and the KSC International Space Station and Payloads Processing Directorate worked with the NASA KSC Education Programs and University Research Division to coordinate the students visit.

  10. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    ; Finance Templates Travel One-Stop Acknowledging MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Finance Templates Travel Facilities & Space Planning

  11. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.; Yan, Eugene

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloridemore » found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research institute operated by UChicago Argonne, LLC, for the U.S. Department of Energy.« less

  12. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less

  13. Computer-Assisted School Facility Planning with ONPASS.

    ERIC Educational Resources Information Center

    Urban Decision Systems, Inc., Los Angeles, CA.

    The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…

  14. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  15. Use of information systems in Air Force medical treatment facilities in strategic planning and decision-making.

    PubMed

    Yap, Glenn A; Platonova, Elena A; Musa, Philip F

    2006-02-01

    An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.

  16. Science Facilities Bibliography.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…

  17. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Recommendations for assuring facility development. 256.42 Section 256.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan...

  18. 30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE GRADE AND AT LEVEL OF OPERATING CORRIDOR. INEEL DRAWING NUMBER 200-0633-00-287-106351. FLUOR NUMBER 5775-CPP-633-A-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  19. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...

  20. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear Facilities Safety Board is soliciting comments from all interested and potentially...

Top