Sample records for fail safe operation

  1. Adaptive voting computer system

    NASA Technical Reports Server (NTRS)

    Koczela, L. J.; Wilgus, D. S. (Inventor)

    1974-01-01

    A computer system is reported that uses adaptive voting to tolerate failures and operates in a fail-operational, fail-safe manner. Each of four computers is individually connected to one of four external input/output (I/O) busses which interface with external subsystems. Each computer is connected to receive input data and commands from the other three computers and to furnish output data commands to the other three computers. An adaptive control apparatus including a voter-comparator-switch (VCS) is provided for each computer to receive signals from each of the computers and permits adaptive voting among the computers to permit the fail-operational, fail-safe operation.

  2. 29 CFR 1910.179 - Overhead and gantry cranes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... adequately guarded or isolated. (40) Fail-safe means a provision designed to automatically stop or safely... shall be capable of maintaining safe lowering speeds of rated loads. (ii) The control braking means... the crane operator. (viii) Automatic cranes shall be so designed that all motions shall fail-safe if...

  3. 75 FR 77524 - Special Conditions: Sikorsky Aircraft Corporation Model S-92A Helicopter; Installation of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... must provide fail-safe operations during coupled maneuvers. The demonstration of fail-safe operations... receive your comments by February 11, 2011. ADDRESSES: You must mail or deliver two copies of your... your comments: Docket No. SW023. You can inspect comments in the Docket on weekdays, except Federal...

  4. Automatic protective vent has fail-safe feature

    NASA Technical Reports Server (NTRS)

    Dameron, C. E.

    1966-01-01

    Delayed vent valve system in a mechanical backing pump in a vacuum system allows the pneumatic foreline valve to seal before the pump vent opens. The system is designed to be fail-safe and operate even though there is loss of electrical power.

  5. Fail-safe bidirectional valve driver

    NASA Technical Reports Server (NTRS)

    Fujimoto, H.

    1974-01-01

    Cross-coupled diodes are added to commonly used bidirectional valve driver circuit to protect circuit and power supply. Circuit may be used in systems requiring fail-safe bidirectional valve operation, particularly in chemical- and petroleum-processing control systems and computer-controlled hydraulic or pneumatic systems.

  6. Improved Quick Disconnect (QD) Interface Through Fail Safe Parts Identification

    NASA Technical Reports Server (NTRS)

    Blanch-Payne, Evelyn

    2001-01-01

    An extensive review of existing Quick Disconnects (QDs) mating and demating operations was performed to determine which shuttle part interface identifications and procedures contribute to human factor errors. The research methods used consisted of interviews with engineers and technicians, examination of incident reports, critiques of video and audio tapes of QD operations, and attendance of a Hyper QD operational course. The data strongly suggests that there are inherit human factor errors involved in QD operations. To promote fail-safe operations, QD interface problem areas and recommendations were outlined and reviewed. It is suggested that dialogue, investigations and recommendations continue.

  7. Critical issues in assuring long lifetime and fail-safe operation of optical communications network

    NASA Astrophysics Data System (ADS)

    Paul, Dilip K.

    1993-09-01

    Major factors in assuring long lifetime and fail-safe operation in optical communications networks are reviewed in this paper. Reliable functionality to design specifications, complexity of implementation, and cost are the most critical issues. As economics is the driving force to set the goals as well as priorities for the design, development, safe operation, and maintenance schedules of reliable networks, a balance is sought between the degree of reliability enhancement, cost, and acceptable outage of services. Protecting both the link and the network with high reliability components, hardware duplication, and diversity routing can ensure the best network availability. Case examples include both fiber optic and lasercom systems. Also, the state-of-the-art reliability of photonics in space environment is presented.

  8. HOME - An application of fault-tolerant techniques and system self-testing. [independent computer for helicopter flight control command monitoring

    NASA Technical Reports Server (NTRS)

    Holden, D. G.

    1975-01-01

    Hard Over Monitoring Equipment (HOME) has been designed to complement and enhance the flight safety of a flight research helicopter. HOME is an independent, highly reliable, and fail-safe special purpose computer that monitors the flight control commands issued by the flight control computer of the helicopter. In particular, HOME detects the issuance of a hazardous hard-over command for any of the four flight control axes and transfers the control of the helicopter to the flight safety pilot. The design of HOME incorporates certain reliability and fail-safe enhancement design features, such as triple modular redundancy, majority logic voting, fail-safe dual circuits, independent status monitors, in-flight self-test, and a built-in preflight exerciser. The HOME design and operation is described with special emphasis on the reliability and fail-safe aspects of the design.

  9. Establishment of design criteria for acceptable failure modes and fail safe considerations for the space shuttle structural system

    NASA Technical Reports Server (NTRS)

    Westrup, R. W.

    1972-01-01

    Investigations of fatigue life, and safe-life and fail-safe design concepts as applied to space shuttle structure are summarized. The results are evaluated to select recommended structural design criteria to provide assurance that premature failure due to propagation of undetected crack-like defects will not occur during shuttle operational service. The space shuttle booster, GDC configuration B-9U, is selected as the reference vehicle. Structural elements used as basis of detail analyses include wing spar caps, vertical stabilizer skins, crew compartment skin, orbiter support frame, and propellant tank shell structure. Fatigue life analyses of structural elements are performed to define potential problem areas and establish upper limits of operating stresses. Flaw growth analyses are summarized in parametric form over a range of initial flaw types and sizes, operating stresses and service life requirements. Service life of 100 to 500 missions is considered.

  10. Worcester 1 Inch Solenoid Actuated Gas Operated SCHe System Valves

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MISKA, C.R.

    1 inch gas-operated full-port ball valves incorporate a solenoid and limit switches as integral parts of the actuator. These valves are normally open and fail safe to the open position (GOV-1*02 and 1*06 fail closed) to provide a flow path of helium gas to the MCO under helium purge and off-normal conditions when the MCO is isolated.

  11. Worcester 1 Inch Solenoid Actuated Gas Operated SCHe System Valves

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    VAN KATWIJK, C.

    1 inch Gas-operated full-port ball valves incorporate a solenoid and limit switches as integral parts of the actuator. These valves are normally open and fail safe to the open position (GOV-1*02 and 1*06 fail closed) to provide a flow path of helium gas to the MCO under helium purge and off-normal conditions when the MCO is isolated.

  12. Towards a damage tolerance philosophy for composite materials and structures

    NASA Technical Reports Server (NTRS)

    O'Brien, T. Kevin

    1990-01-01

    A damage-threshold/fail-safe approach is proposed to ensure that composite structures are both sufficiently durable for economy of operation, as well as adequately fail-safe or damage tolerant for flight safety. Matrix cracks are assumed to exist throughout the off-axis plies. Delamination onset is predicted using a strain energy release rate characterization. Delamination growth is accounted for in one of three ways: either analytically, using delamination growth laws in conjunction with strain energy release rate analyses incorporating delamination resistance curves; experimentally, using measured stiffness loss; or conservatively, assuming delamination onset corresponds to catastrophic delamination growth. Fail-safety is assessed by accounting for the accumulation of delaminations through the thickness. A tension fatigue life prediction for composite laminates is presented as a case study to illustrate how this approach may be implemented. Suggestions are made for applying the damage-threshold/fail-safe approach to compression fatigue, tension/compression fatigue, and compression strength following low velocity impact.

  13. Towards a damage tolerance philosophy for composite materials and structures

    NASA Technical Reports Server (NTRS)

    Obrien, T. Kevin

    1988-01-01

    A damage-threshold/fail-safe approach is proposed to ensure that composite structures are both sufficiently durable for economy of operation, as well as adequately fail-safe or damage tolerant for flight safety. Matrix cracks are assumed to exist throughout the off-axis plies. Delamination onset is predicted using a strain energy release rate characterization. Delamination growth is accounted for in one of three ways: either analytically, using delamination growth laws in conjunction with strain energy release rate analyses incorporating delamination resistance curves; experimentally, using measured stiffness loss; or conservatively, assuming delamination onset corresponds to catastrophic delamination growth. Fail-safety is assessed by accounting for the accumulation of delaminations through the thickness. A tension fatigue life prediction for composite laminates is presented as a case study to illustrate how this approach may be implemented. Suggestions are made for applying the damage-threshold/fail-safe approach to compression fatigue, tension/compression fatigue, and compression strength following low velocity impact.

  14. 30 CFR 77.312 - Fail safe monitoring systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fail safe monitoring systems. 77.312 Section 77... Thermal Dryers § 77.312 Fail safe monitoring systems. Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment...

  15. 30 CFR 77.312 - Fail safe monitoring systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fail safe monitoring systems. 77.312 Section 77... Thermal Dryers § 77.312 Fail safe monitoring systems. Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment...

  16. 30 CFR 77.312 - Fail safe monitoring systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fail safe monitoring systems. 77.312 Section 77... Thermal Dryers § 77.312 Fail safe monitoring systems. Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment...

  17. 30 CFR 77.312 - Fail safe monitoring systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fail safe monitoring systems. 77.312 Section 77... Thermal Dryers § 77.312 Fail safe monitoring systems. Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment...

  18. 30 CFR 77.312 - Fail safe monitoring systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fail safe monitoring systems. 77.312 Section 77... Thermal Dryers § 77.312 Fail safe monitoring systems. Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment...

  19. Photovoltaic power system reliability considerations

    NASA Technical Reports Server (NTRS)

    Lalli, V. R.

    1980-01-01

    An example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems is presented. This particular application is for a solar cell power system demonstration project designed to provide electric power requirements for remote villages. The techniques utilized involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of fail-safe and planned spare parts engineering philosophy.

  20. Photovoltaic power system reliability considerations

    NASA Technical Reports Server (NTRS)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  1. Safety considerations in the design and operation of large wind turbines

    NASA Technical Reports Server (NTRS)

    Reilly, D. H.

    1979-01-01

    The engineering and safety techniques used to assure the reliable and safe operation of large wind turbine generators utilizing the Mod 2 Wind Turbine System Program as an example is described. The techniques involve a careful definition of the wind turbine's natural and operating environments, use of proven structural design criteria and analysis techniques, an evaluation of potential failure modes and hazards, and use of a fail safe and redundant component engineering philosophy. The role of an effective quality assurance program, tailored to specific hardware criticality, and the checkout and validation program developed to assure system integrity are described.

  2. Braking System for Wind Turbines

    NASA Technical Reports Server (NTRS)

    Krysiak, J. E.; Webb, F. E.

    1987-01-01

    Operating turbine stopped smoothly by fail-safe mechanism. Windturbine braking systems improved by system consisting of two large steel-alloy disks mounted on high-speed shaft of gear box, and brakepad assembly mounted on bracket fastened to top of gear box. Lever arms (with brake pads) actuated by spring-powered, pneumatic cylinders connected to these arms. Springs give specific spring-loading constant and exert predetermined load onto brake pads through lever arms. Pneumatic cylinders actuated positively to compress springs and disengage brake pads from disks. During power failure, brakes automatically lock onto disks, producing highly reliable, fail-safe stops. System doubles as stopping brake and "parking" brake.

  3. 30 CFR 75.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fail safe ground check circuits on high-voltage... High-Voltage Distribution § 75.803 Fail safe ground check circuits on high-voltage resistance grounded... shall include a fail safe ground check circuit to monitor continuously the grounding circuit to assure...

  4. 30 CFR 75.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fail safe ground check circuits on high-voltage... High-Voltage Distribution § 75.803 Fail safe ground check circuits on high-voltage resistance grounded... shall include a fail safe ground check circuit to monitor continuously the grounding circuit to assure...

  5. 30 CFR 75.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fail safe ground check circuits on high-voltage... High-Voltage Distribution § 75.803 Fail safe ground check circuits on high-voltage resistance grounded... shall include a fail safe ground check circuit to monitor continuously the grounding circuit to assure...

  6. 30 CFR 75.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fail safe ground check circuits on high-voltage... High-Voltage Distribution § 75.803 Fail safe ground check circuits on high-voltage resistance grounded... shall include a fail safe ground check circuit to monitor continuously the grounding circuit to assure...

  7. 30 CFR 77.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fail safe ground check circuits on high-voltage... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803 Fail safe ground check..., resistance grounded systems shall include a fail safe ground check circuit or other no less effective device...

  8. 30 CFR 77.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fail safe ground check circuits on high-voltage... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803 Fail safe ground check..., resistance grounded systems shall include a fail safe ground check circuit or other no less effective device...

  9. 30 CFR 77.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fail safe ground check circuits on high-voltage... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803 Fail safe ground check..., resistance grounded systems shall include a fail safe ground check circuit or other no less effective device...

  10. 30 CFR 77.803 - Fail safe ground check circuits on high-voltage resistance grounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fail safe ground check circuits on high-voltage... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803 Fail safe ground check..., resistance grounded systems shall include a fail safe ground check circuit or other no less effective device...

  11. Prototype data terminal: Multiplexer/demultiplexer

    NASA Technical Reports Server (NTRS)

    Leck, D. E.; Goodwin, J. E.

    1972-01-01

    The design and operation of a quad redundant data terminal and a multiplexer/demultiplexer (MDU) design are described. The most unique feature is the design of the quad redundant data terminal. This is one of the few designs where the unit is fail/op, fail/op, fail/safe. Laboratory tests confirm that the unit will operate satisfactorily with the failure of three out of four channels. Although the design utilizes state-of-the-art technology. The waveform error checks, the voting techniques, and the parity bit checks are believed to be used in unique configurations. Correct word selection routines are also novel, if not unique. The MDU design, while not redundant, utilizes, the latest state-of-the-art advantages of light couplers and integrated circuit amplifiers.

  12. Rotating assembly working group summary

    NASA Technical Reports Server (NTRS)

    Kulkarni, S. V.

    1984-01-01

    The feasibility of a fail safe flywheel system was demonstrated. Three of the major advantages of flywheel systems are: longer operational life, higher electrical efficiency, and higher system energy density. The use of composite material flywheels is important to realize these advantages. Rotor design and dynamics, rotor materials and fabrication, safety, nondestructive testing, and systems operation loads and environment, are outlined.

  13. A fail-safe CMOS logic gate

    NASA Technical Reports Server (NTRS)

    Bobin, V.; Whitaker, S.

    1990-01-01

    This paper reports a design technique to make Complex CMOS Gates fail-safe for a class of faults. Two classes of faults are defined. The fail-safe design presented has limited fault-tolerance capability. Multiple faults are also covered.

  14. Design of a bistable electromagnetic coupling mechanism for underactuated manipulators

    NASA Astrophysics Data System (ADS)

    Miyuranga Kaluarachchi, Malaka; Ho, Jee-Hou; Yahya, Samer; Teh, Sze-Hong

    2018-07-01

    Electromagnetic clutches have been widely used in underactuated lightweight manipulator designs as a coupling mechanism due to their advantages of fast activation and electrical controllability. However, an electromagnetic clutch consumes electrical energy continuously during its operation. Furthermore, conventional electromagnetic clutches are not fail-safe in unexpected power failure conditions. These factors have a significant impact on the energy efficiency and the safety of the design, and these are vital aspects for underactuated lightweight manipulators. This paper introduces a bistable electromagnetic coupling mechanism design, with reduced energy consumption and with a fail-safe mechanism. The concept of a bistable electromagnetic mechanism consists of an electromagnet with two permanent magnets. The design has the capability to maintain stable mechanism states, either engaged or disengaged, without a continuous electrical power supply, thus enhancing fail-safety and efficiency. Moreover, the design incorporates the advantages of conventional electromagnetic clutches such as rapid activation and electrical controllability. The experimental results highlight the effectiveness of the proposed mechanism in reducing electric energy consumption. Besides this, a theoretical model is developed and a good correlation is achieved between the theoretical and experimental results. The reduced electric energy consumption and fail-safe design make the bistable electromagnetic mechanism a promising concept for underactuated lightweight manipulators.

  15. Investigation of safe-life fail-safe criteria for the space shuttle

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An investigation was made to determine the effects of a safe-life design approach and a fail-safe design approach on the space shuttle booster vehicle structure, and to recommend any changes to the structural design criteria. Two configurations of the booster vehicle were considered, one incorporating a delta wing (B-9U configuration) and the other a swept wing (B-16B configuration). Several major structural components of the booster were studied to determine the fatigue life, safe-life, and fail-safe capabilities of the baseline design. Each component was investigated to determine the practicability of applying a safe-life or fail-safe design philosophy, the changes such design approaches might require, and the impact of these changes on weight, cost, development plans, and performance.

  16. Less than severe worst case accidents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanders, G.A.

    1996-08-01

    Many systems can provide tremendous benefit if operating correctly, produce only an inconvenience if they fail to operate, but have extreme consequences if they are only partially disabled such that they operate erratically or prematurely. In order to assure safety, systems are often tested against the most severe environments and accidents that are considered possible to ensure either safe operation or safe failure. However, it is often the less severe environments which result in the ``worst case accident`` since these are the conditions in which part of the system may be exposed or rendered unpredictable prior to total system failure.more » Some examples of less severe mechanical, thermal, and electrical environments which may actually be worst case are described as cautions for others in industries with high consequence operations or products.« less

  17. The design and implementation of on-line monitoring system for UHV compact shunt capacitors

    NASA Astrophysics Data System (ADS)

    Tao, Weiliang; Ni, Xuefeng; Lin, Hao; Jiang, Shengbao

    2017-08-01

    Because of the large capacity and compact structure of the UHV compact shunt capacitor, it is difficult to take effective measures to detect and prevent the faults. If the fault capacitor fails to take timely maintenance, it will pose a threat to the safe operation of the system and the life safety of the maintenance personnel. The development of UHV compact shunt capacitor on-line monitoring system can detect and record the on-line operation information of UHV compact shunt capacitors, analyze and evaluate the early fault warning signs, find out the fault capacitor or the capacitor with fault symptom, to ensure safe and reliable operation of the system.

  18. Method and apparatus for in-cell vacuuming of radiologically contaminated materials

    DOEpatents

    Spadaro, Peter R.; Smith, Jay E.; Speer, Elmer L.; Cecconi, Arnold L.

    1987-01-01

    A vacuum air flow operated cyclone separator arrangement for collecting, handling and packaging loose contaminated material in accordance with acceptable radiological and criticality control requirements. The vacuum air flow system includes a specially designed fail-safe prefilter installed upstream of the vacuum air flow power supply. The fail-safe prefilter provides in-cell vacuum system flow visualization and automatically reduces or shuts off the vacuum air flow in the event of an upstream prefilter failure. The system is effective for collecting and handling highly contaminated radiological waste in the form of dust, dirt, fuel element fines, metal chips and similar loose material in accordance with radiological and criticality control requirements for disposal by means of shipment and burial.

  19. Voter comparator switch provides fail safe data communications system - A concept

    NASA Technical Reports Server (NTRS)

    Koczela, L. J.; Wilgus, D. S.

    1971-01-01

    System indicates status of computers and controls operational modes. Two matrices are used - one relating to permissible system states, the other relating to requested system states. Concept is useful to designers of digital data transmission systems and time shared computer systems.

  20. On the calculation of low-thrust fail-safe trajectories

    NASA Technical Reports Server (NTRS)

    Sauer, C. G., Jr.

    1975-01-01

    A guidance algorithm is developed for a low-thrust spacecraft such that target intercept is possible in spite of premature thrust termination along the trajectory. Such a trajectory is called a 'fail-safe' trajectory and the spacecraft thrust is utilized to minimize the relative target-spacecraft approach speed. The fail-safe guidance algorithm is solved using the concept of a critical thrust plane and a non-critical thrust direction. Several examples of fail-safe guidance are presented for a solar-electric propulsion flyby mission to the comet Encke.

  1. Worcester 1 Inch Solenoid Actuated Gas Operated SCHe System Valves

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    VAN KATWIJK, C.

    1 inch Gas-operated full-port ball valves incorporate a solenoid and limit switches as integral parts of the actuator. These valves are normally open and fail safe to the open position (GOV-1*02 and 1*06 fall closed) to provide a flow path of helium gas to the MCO under helium purge and off-normal conditions when the MCO is isolated.

  2. 30 CFR 77.902-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fail safe ground check circuits; maximum voltage. 77.902-1 Section 77.902-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Low- and Medium-Voltage Alternating Current Circuits § 77.902-1 Fail safe...

  3. 30 CFR 77.902-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fail safe ground check circuits; maximum voltage. 77.902-1 Section 77.902-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Low- and Medium-Voltage Alternating Current Circuits § 77.902-1 Fail safe...

  4. 30 CFR 77.803-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fail safe ground check circuits; maximum voltage. 77.803-1 Section 77.803-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803-1 Fail safe ground check...

  5. 30 CFR 77.803-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fail safe ground check circuits; maximum voltage. 77.803-1 Section 77.803-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803-1 Fail safe ground check...

  6. 30 CFR 77.902-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fail safe ground check circuits; maximum voltage. 77.902-1 Section 77.902-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Low- and Medium-Voltage Alternating Current Circuits § 77.902-1 Fail safe...

  7. 30 CFR 77.803-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fail safe ground check circuits; maximum voltage. 77.803-1 Section 77.803-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803-1 Fail safe ground check...

  8. 77 FR 21422 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... the fail-safe interlayer of certain No. 2 and No. 3 glass windows, which could result in loss of the... would hinder the internal or external detailed inspections for fail-safe interlayer cracks, glass pane... this AD only if the non-clear damage hinders the inspection for fail-safe interlayer cracks, glass pane...

  9. 30 CFR 77.803-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fail safe ground check circuits; maximum... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803-1 Fail safe ground check circuits; maximum voltage. The maximum voltage used for ground check circuits under § 77.803 shall not...

  10. 30 CFR 77.803-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fail safe ground check circuits; maximum... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.803-1 Fail safe ground check circuits; maximum voltage. The maximum voltage used for ground check circuits under § 77.803 shall not...

  11. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... sudden loss of control due to loss of hydraulic system pressure. A system is considered to be fail-safe... catalog number and maximum allowable working pressure. (k) Existing hydraulic piping, nonmetallic hose...

  12. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... sudden loss of control due to loss of hydraulic system pressure. A system is considered to be fail-safe... catalog number and maximum allowable working pressure. (k) Existing hydraulic piping, nonmetallic hose...

  13. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... sudden loss of control due to loss of hydraulic system pressure. A system is considered to be fail-safe... catalog number and maximum allowable working pressure. (k) Existing hydraulic piping, nonmetallic hose...

  14. 46 CFR 28.880 - Hydraulic equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... times the system's maximum operating pressure. (c) Each hydraulic system must be equipped with at least... sudden loss of control due to loss of hydraulic system pressure. A system is considered to be fail-safe... catalog number and maximum allowable working pressure. (k) Existing hydraulic piping, nonmetallic hose...

  15. Study of fail-safe abort system for an actively cooled hypersonic aircraft, volume 2

    NASA Technical Reports Server (NTRS)

    Peeples, M. E.; Herring, R. L.

    1976-01-01

    Conceptual designs of a fail-safe abort system for hydrogen fueled actively cooled high speed aircraft are examined. The fail-safe concept depends on basically three factors: (1) a reliable method of detecting a failure or malfunction in the active cooling system, (2) the optimization of abort trajectories which minimize the descent heat load to the aircraft, and (3) fail-safe thermostructural concepts to minimize both the weight and the maximum temperature the structure will reach during descent. These factors are examined and promising approaches are evaluated based on weight, reliability, ease of manufacture and cost.

  16. 76 FR 10288 - Airworthiness Directives; The Boeing Company Model 767-200, -300, -300F, and -400ER Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... and corrosion to an area within five inches of the fail-safe strap. Revision 2 of this service.... The existing AD currently requires inspections to detect cracking or corrosion of the fail-safe straps... corrective actions. Since we issued that AD, we have received additional reports of cracks in 51 fail-safe...

  17. Study of a fail-safe abort system for an actively cooled hypersonic aircraft. Volume 1: Technical summary

    NASA Technical Reports Server (NTRS)

    Pirello, C. J.; Herring, R. L.

    1976-01-01

    Conceptual designs of a fail-safe abort system for hydrogen fueled actively cooled high speed aircraft are examined. The fail-safe concept depends on basically three factors: (1) a reliable method of detecting a failure or malfunction in the active cooling system, (2) the optimization of abort trajectories which minimize the descent heat load to the aircraft, and (3) fail-safe thermostructural concepts to minimize both the weight and the maximum temperature the structure will reach during descent. These factors are examined and promising approaches are evaluated based on weight, reliability, ease of manufacture and cost.

  18. Compendium of fracture mechanics problems

    NASA Technical Reports Server (NTRS)

    Stallworth, R.; Wilson, C.; Meyers, C.

    1990-01-01

    Fracture mechanics analysis results are presented from the following structures/components analyzed at Marshall Space Flight Center (MSFC) between 1982 and 1989: space shuttle main engine (SSME), Hubble Space Telescope (HST), external tank attach ring, B-1 stand LOX inner tank, and solid rocket booster (SRB). Results from the SSME high pressure fuel turbopump (HPFTP) second stage blade parametric analysis determine a critical flaw size for a wide variety of stress intensity values. The engine 0212 failure analysis was a time dependent fracture life assessment. Results indicated that the disk ruptured due to an overspeed condition. Results also indicated that very small flaws in the curvic coupling area could propagate and lead to failure under normal operating conditions. It was strongly recommended that a nondestructive evaluation inspection schedule be implemented. The main ring of the HST, scheduled to launch in 1990, was analyzed by safe-life and fail-safe analyses. First safe-life inspection criteria curves for the ring inner and outer skins and the fore and aft channels were derived. Afterwards the skins and channels were determined to be fail-safe by analysis. A conservative safe-life analysis was done on the 270 redesign external tank attach ring. Results from the analysis were used to determine the nondestructive evaluation technique required.

  19. 76 FR 38074 - Airworthiness Directives; The Boeing Company Model 747-100, 747-100B, 747-200B, 747-200C, 747...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... withstand fail-safe loads. DATES: We must receive comments on this proposed AD by August 15, 2011. ADDRESSES... pressurization and the inability of the airplane fuselage to withstand fail-safe loads. Actions Since Existing AD... withstand fail-safe loads. Compliance (f) You are responsible for having the actions required by this AD...

  20. 77 FR 26663 - Airworthiness Directives; The Boeing Company Model 767-200, -300, -300F, and -400ER Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... removing corrosion from fail-safe straps. We have received Boeing Service Bulletin 767-53A0100, Revision 3.... That AD currently requires inspections to detect cracking or corrosion of the fail-safe straps between... cracks in 51 fail-safe straps on 41 airplanes; we have also received a report of a crack found in the ``T...

  1. Operational and support considerations in standardization

    NASA Astrophysics Data System (ADS)

    Oreilly, W. T.

    Military applications in the era of the 1990's and beyond, require capabilities beyond those available in most existing systems. These capabilities must be provided in a manner that will achieve a low logistic support cost and that can be maintained with relatively inexperienced personnel. This paper presents the design considerations that must be addressed in each of the standardized subsystems and modules that will provide the operational and support needs for tomorrow and beyond. Advanced maintenance concepts, such as two and one level maintenance, are described together with the operational and life cycle cost benefits that will be achieved. A new operation concept called deferred maintenance, which provides sustained operation without maintenance support, is presented. The fault tolerant architecture which will permit a standardized modular design to efficiently accommodate a variety of system applications is presented. The concerns discussed include combat damage survivability, fail safe and fail operational needs, as well as high availability for long life applications as is required for systems employed in the Space Defense Initiative (SDI).

  2. When the science fails and the ethics works: 'Fail-safe' ethics in the FEM-PrEP study.

    PubMed

    Kingori, Patricia

    2015-12-01

    This paper will explore the concept of 'fail safe' ethics in the FEM PrEP trial, and the practice of research and ethics on the ground. FEM-PrEP examined the efficacy of PrEP in African women after promising outcomes in research conducted with MSM. This was a hugely optimistic time and FEM-PrEP was mobilised using rights-based ethical arguments that women should have access to PrEP. This paper will present data collected during an ethnographic study of frontline research workers involved in FEM-PrEP. During our discussions, 'fail-safe' ethics emerged as concept that encapsulated their confidence that their ethics could not fail. However, in 2011, FEM-PrEP was halted and deemed a failure. The women involved in the study were held responsible because contrary to researcher's expectations they were not taking the oral PrEP being researched. This examination of FEM-PrEP will show that ethical arguments are increasingly deployed to mobilise, maintain and in some cases stop trials in ways which, at times, are superseded or co-opted by other interests. While promoting the interests of women, rights-based approaches are argued to indirectly justify the continuation of individualised, biomedical interventions which have been problematic in other women-centred trials. In this examination of FEM-PrEP, the rights-based approach obscured: ethical concerns beyond access to PrEP; the complexities of power relationships between donor and host countries; the operations of the HIV industry in research-saturated areas and the cumulative effect of unfilled expectations in HIV research and how this has shaped ideas of research and ethics.

  3. Space shuttle environmental control/life support systems

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This study analyzes and defines a baseline Environmental Control/Life Support System (EC/LSS) for a four-man, seven-day orbital shuttle. In addition, the impact of various mission parameters, crew size, mission length, etc. are examined for their influence on the selected system. Pacing technology items are identified to serve as a guide for application of effort to enhance the total system optimization. A fail safe-fail operation philosophy was utilized in designing the system. This has resulted in a system that requires only one daily routine operation. All other critical item malfunctions are automatically resolved by switching to redundant modes of operation. As a result of this study, it is evident that a practical, flexible, simple and long life, EC/LSS can be designed and manufactured for the shuttle orbiter within the time phase required.

  4. 76 FR 19278 - Airworthiness Directives; The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... are proposing this AD to detect and correct cracking in the fail-safe interlayer of certain No. 2 and... to detect and correct cracking in the fail-safe interlayer of certain No. 2 and No. 3 glass windows... cracking in the fail-safe interlayer of certain No. 2 and No. 3 glass windows, which could result in loss...

  5. Fail-safe reactivity compensation method for a nuclear reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nygaard, Erik T.; Angelo, Peter L.; Aase, Scott B.

    The present invention relates generally to the field of compensation methods for nuclear reactors and, in particular to a method for fail-safe reactivity compensation in solution-type nuclear reactors. In one embodiment, the fail-safe reactivity compensation method of the present invention augments other control methods for a nuclear reactor. In still another embodiment, the fail-safe reactivity compensation method of the present invention permits one to control a nuclear reaction in a nuclear reactor through a method that does not rely on moving components into or out of a reactor core, nor does the method of the present invention rely on themore » constant repositioning of control rods within a nuclear reactor in order to maintain a critical state.« less

  6. The role of the donor liaison officer at PlusLife (Perth Bone and Tissue Bank Inc.), Western Australia.

    PubMed

    Smythe, Claire; White, Nicola; Winter, Joyleen; Cowie, Anne

    2015-06-01

    Femoral head donation at the time of hip replacement surgery provides a much needed resource of bone allograft to orthopaedic surgeons. Prior to 2005, potential femoral head donors were identified and consented in the hospital setting on the day of surgery. This resulted in over 40 % of donations failing post operatively suggesting that more effort could be given to pre-operative screening resulting in substantial savings in the cost associated with collection and testing of donors who were subsequently failed. The Donor Liaison role was implemented in 2005 to coordinate a Femoral Head Donation program maximising the number of successful donations through pre-operative screening. This study reviews the effectiveness of pre-operative screening of potential femoral head donors at PlusLife from 2002-2012. A retrospective audit of the database was undertaken 2002-2012 and medical/social reasons for pre-operative and postoperative failures were collated into 4 main categories to enable comparison: malignancy, autoimmune conditions, variant Creutzfeldt Jakob disease risk and general medical/social reasons. The number of femoral heads failed post operatively has decreased significantly from 26 % in 2003 to 6 % in 2012. A cost of $121,000 was expended on femoral heads failed post operatively in 2004, as compared to $20,350 in 2012. Donors excluded due to the 4 main categories (medical/social history) were identified pre-operatively in over 80 % of all cases. Preoperative screening of femoral head donors through a coordinated Femoral Head Donation Program is a safe and cost effective method.

  7. Evolution of the Hubble Space Telescope Safing Systems

    NASA Technical Reports Server (NTRS)

    Pepe, Joyce; Myslinski, Michael

    2006-01-01

    The Hubble Space Telescope (HST) was launched on April 24 1990, with an expected lifespan of 15 years. Central to the spacecraft design was the concept of a series of on-orbit shuttle servicing missions permitting astronauts to replace failed equipment, update the scientific instruments and keep the HST at the forefront of astronomical discoveries. One key to the success of the Hubble mission has been the robust Safing systems designed to monitor the performance of the observatory and to react to keep the spacecraft safe in the event of equipment anomaly. The spacecraft Safing System consists of a range of software tests in the primary flight computer that evaluate the performance of mission critical hardware, safe modes that are activated when the primary control mode is deemed inadequate for protecting the vehicle, and special actions that the computer can take to autonomously reconfigure critical hardware. The HST Safing System was structured to autonomously detect electrical power system, data management system, and pointing control system malfunctions and to configure the vehicle to ensure safe operation without ground intervention for up to 72 hours. There is also a dedicated safe mode computer that constantly monitors a keep-alive signal from the primary computer. If this signal stops, the safe mode computer shuts down the primary computer and takes over control of the vehicle, putting it into a safe, low-power configuration. The HST Safing system has continued to evolve as equipment has aged, as new hardware has been installed on the vehicle, and as the operation modes have matured during the mission. Along with the continual refinement of the limits used in the safing tests, several new tests have been added to the monitoring system, and new safe modes have been added to the flight software. This paper will focus on the evolution of the HST Safing System and Safing tests, and the importance of this evolution to prolonging the science operations of the telescope.

  8. Main propulsion system design recommendations for an advanced Orbit Transfer Vehicle

    NASA Technical Reports Server (NTRS)

    Redd, L.

    1985-01-01

    Various main propulsion system configurations of an advanced OTV are evaluated with respect to the probability of nonindependent failures, i.e., engine failures that disable the entire main propulsion system. Analysis of the life-cycle cost (LCC) indicates that LCC is sensitive to the main propulsion system reliability, vehicle dry weight, and propellant cost; it is relatively insensitive to the number of missions/overhaul, failures per mission, and EVA and IVA cost. In conclusion, two or three engines are recommended in view of their highest reliability, minimum life-cycle cost, and fail operational/fail safe capability.

  9. New Developments in FPGA: SEUs and Fail-Safe Strategies from the NASA Goddard Perspective

    NASA Technical Reports Server (NTRS)

    Berg, Melanie D.; Label, Kenneth A.; Pellish, Jonathan

    2016-01-01

    It has been shown that, when exposed to radiation environments, each Field Programmable Gate Array (FPGA) device has unique error signatures. Subsequently, fail-safe and mitigation strategies will differ per FPGA type. In this session several design approaches for safe systems will be presented. It will also explore the benefits and limitations of several mitigation techniques. The intention of the presentation is to provide information regarding FPGA types, their susceptibilities, and proven fail-safe strategies; so that users can select appropriate mitigation and perform the required trade for system insertion. The presentation will describe three types of FPGA devices and their susceptibilities in radiation environments.

  10. New Developments in FPGA: SEUs and Fail-Safe Strategies from the NASA Goddard Perspective

    NASA Technical Reports Server (NTRS)

    Berg, Melanie D.; LaBel, Kenneth; Pellish, Jonathan

    2015-01-01

    It has been shown that, when exposed to radiation environments, each Field Programmable Gate Array (FPGA) device has unique error signatures. Subsequently, fail-safe and mitigation strategies will differ per FPGA type. In this session several design approaches for safe systems will be presented. It will also explore the benefits and limitations of several mitigation techniques. The intention of the presentation is to provide information regarding FPGA types, their susceptibilities, and proven fail-safe strategies; so that users can select appropriate mitigation and perform the required trade for system insertion. The presentation will describe three types of FPGA devices and their susceptibilities in radiation environments.

  11. Stabilization and reconstruction operations: the role of the US Army Veterinary Corps.

    PubMed

    Smith, John C

    2007-01-01

    Stabilization and reconstruction operations in failed or failing states are vital to US security interests. These operations require a bottom-up approach, focusing on the population as the strategic center of gravity. This bottom-up approach must address the population's basic needs, as defined by Dr Abraham Maslow's hierarchy of needs, and provide a long-term means of self-sufficiency, rather than creating an "aid dependent economy." Focusing operations on agricultural projects provides relief from donor dependency, stimulates economic growth, and thwarts the power of spoilers. US Army Veterinary Corps personnel provide essential services ensuring the procurement of safe and wholesome subsistence and provision of medical care to government-owned animals. Veterinary Corps officers are also uniquely qualified to design and implement agricultural stabilization and reconstruction programs in conjunction with host-state ministries and agencies across the full range of military operations. Early, sustained engagement by veterinarians stimulates agricultural productivity, improves animal and human health, directly supports the population's hierarchy of needs on all levels, and accelerates stabilization operations by reducing the population's susceptibility to spoilers.

  12. Response Variability in Commercial MOSFET SEE Qualification

    DOE PAGES

    George, J. S.; Clymer, D. A.; Turflinger, T. L.; ...

    2016-12-01

    Single-event effects (SEE) evaluation of five different part types of next generation, commercial trench MOSFETs indicates large part-to-part variation in determining a safe operating area (SOA) for drain-source voltage (V DS) following a test campaign that exposed >50 samples per part type to heavy ions. These results suggest a determination of a SOA using small sample sizes may fail to capture the full extent of the part-to-part variability. An example method is discussed for establishing a Safe Operating Area using a one-sided statistical tolerance limit based on the number of test samples. Finally, burn-in is shown to be a criticalmore » factor in reducing part-to-part variation in part response. Implications for radiation qualification requirements are also explored.« less

  13. Response Variability in Commercial MOSFET SEE Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George, J. S.; Clymer, D. A.; Turflinger, T. L.

    Single-event effects (SEE) evaluation of five different part types of next generation, commercial trench MOSFETs indicates large part-to-part variation in determining a safe operating area (SOA) for drain-source voltage (V DS) following a test campaign that exposed >50 samples per part type to heavy ions. These results suggest a determination of a SOA using small sample sizes may fail to capture the full extent of the part-to-part variability. An example method is discussed for establishing a Safe Operating Area using a one-sided statistical tolerance limit based on the number of test samples. Finally, burn-in is shown to be a criticalmore » factor in reducing part-to-part variation in part response. Implications for radiation qualification requirements are also explored.« less

  14. New Developments in FPGA Devices: SEUs and Fail-Safe Strategies from the NASA Goddard Perspective

    NASA Technical Reports Server (NTRS)

    Berg, Melanie; LaBel, Kenneth; Pellish, Jonathan

    2016-01-01

    It has been shown that, when exposed to radiation environments, each Field Programmable Gate Array (FPGA) device has unique error signatures. Subsequently, fail-safe and mitigation strategies will differ per FPGA type. In this session several design approaches for safe systems will be presented. It will also explore the benefits and limitations of several mitigation techniques. The intention of the presentation is to provide information regarding FPGA types, their susceptibilities, and proven fail-safe strategies; so that users can select appropriate mitigation and perform the required trade for system insertion. The presentation will describe three types of FPGA devices and their susceptibilities in radiation environments.

  15. Fail-safe system for activity cooled supersonic and hypersonic aircraft. [using liquid hydrogen fuel

    NASA Technical Reports Server (NTRS)

    Jones, R. A.; Braswell, D. O.; Richie, C. B.

    1975-01-01

    A fail-safe-system concept was studied as an alternative to a redundant active cooling system for supersonic and hypersonic aircraft which use the heat sink of liquid-hydrogen fuel for cooling the aircraft structure. This concept consists of an abort maneuver by the aircraft and a passive thermal protection system (TPS) for the aircraft skin. The abort manuever provides a low-heat-load descent from normal cruise speed to a lower speed at which cooling is unnecessary, and the passive TPS allows the aircraft skin to absorb the abort heat load without exceeding critical skin temperature. On the basis of results obtained, it appears that this fail-safe-system concept warrants further consideration, inasmuch as a fail-safe system could possibly replace a redundant active cooling system with no increase in weight and would offer other potential advantages.

  16. Fluid check valve has fail-safe feature

    NASA Technical Reports Server (NTRS)

    Gaul, L. C.

    1965-01-01

    Check valve ensures unidirectional fluid flow and, in case of failure, vents the downstream fluid to the atmosphere and gives a positive indication of malfunction. This dual valve consists of a master check valve and a fail-safe valve.

  17. Advanced orbit transfer vehicle propulsion system study

    NASA Technical Reports Server (NTRS)

    Cathcart, J. A.; Cooper, T. W.; Corringrato, R. M.; Cronau, S. T.; Forgie, S. C.; Harder, M. J.; Mcallister, J. G.; Rudman, T. J.; Stoneback, V. W.

    1985-01-01

    A reuseable orbit transfer vehicle concept was defined and subsequent recommendations for the design criteria of an advanced LO2/LH2 engine were presented. The major characteristics of the vehicle preliminary design include a low lift to drag aerocapture capability, main propulsion system failure criteria of fail operational/fail safe, and either two main engines with an attitude control system for backup or three main engines to meet the failure criteria. A maintenance and servicing approach was also established for the advanced vehicle and engine concepts. Design tradeoff study conclusions were based on the consideration of reliability, performance, life cycle costs, and mission flexibility.

  18. Secure Embedded System Design Methodologies for Military Cryptographic Systems

    DTIC Science & Technology

    2016-03-31

    Fault- Tree Analysis (FTA); Built-In Self-Test (BIST) Introduction Secure access-control systems restrict operations to authorized users via methods...failures in the individual software/processor elements, the question of exactly how unlikely is difficult to answer. Fault- Tree Analysis (FTA) has a...Collins of Sandia National Laboratories for years of sharing his extensive knowledge of Fail-Safe Design Assurance and Fault- Tree Analysis

  19. Study of a fail-safe abort system for an actively cooled hypersonic aircraft: Computer program documentation

    NASA Technical Reports Server (NTRS)

    Haas, L. A., Sr.

    1976-01-01

    The Fail-Safe Abort System TEMPerature Analysis Program, (FASTEMP), user's manual is presented. This program was used to analyze fail-safe abort systems for an actively cooled hypersonic aircraft. FASTEMP analyzes the steady state or transient temperature response of a thermal model defined in rectangular, cylindrical, conical and/or spherical coordinate system. FASTEMP provides the user with a large selection of subroutines for heat transfer calculations. The various modes of heat transfer available from these subroutines are: heat storage, conduction, radiation, heat addition or generation, convection, and fluid flow.

  20. Enhanced Flight Vision Systems Operational Feasibility Study Using Radar and Infrared Sensors

    NASA Technical Reports Server (NTRS)

    Etherington, Timothy J.; Kramer, Lynda J.; Severance, Kurt; Bailey, Randall E.; Williams, Steven P.; Harrison, Stephanie J.

    2015-01-01

    Approach and landing operations during periods of reduced visibility have plagued aircraft pilots since the beginning of aviation. Although techniques are currently available to mitigate some of the visibility conditions, these operations are still ultimately limited by the pilot's ability to "see" required visual landing references (e.g., markings and/or lights of threshold and touchdown zone) and require significant and costly ground infrastructure. Certified Enhanced Flight Vision Systems (EFVS) have shown promise to lift the obscuration veil. They allow the pilot to operate with enhanced vision, in lieu of natural vision, in the visual segment to enable equivalent visual operations (EVO). An aviation standards document was developed with industry and government consensus for using an EFVS for approach, landing, and rollout to a safe taxi speed in visibilities as low as 300 feet runway visual range (RVR). These new standards establish performance, integrity, availability, and safety requirements to operate in this regime without reliance on a pilot's or flight crew's natural vision by use of a fail-operational EFVS. A pilot-in-the-loop high-fidelity motion simulation study was conducted at NASA Langley Research Center to evaluate the operational feasibility, pilot workload, and pilot acceptability of conducting straight-in instrument approaches with published vertical guidance to landing, touchdown, and rollout to a safe taxi speed in visibility as low as 300 feet RVR by use of vision system technologies on a head-up display (HUD) without need or reliance on natural vision. Twelve crews flew various landing and departure scenarios in 1800, 1000, 700, and 300 RVR. This paper details the non-normal results of the study including objective and subjective measures of performance and acceptability. The study validated the operational feasibility of approach and departure operations and success was independent of visibility conditions. Failures were handled within the lateral confines of the runway for all conditions tested. The fail-operational concept with pilot in the loop needs further study.

  1. Performance of a fail-safe system to follow up abnormal mammograms in primary care.

    PubMed

    Grossman, Ellie; Phillips, Russell S; Weingart, Saul N

    2010-09-01

    Missed and delayed breast cancer diagnoses are major sources of potential harm to patients and medical malpractice liability in the United States. Follow-up of abnormal mammogram results is an essential but challenging component of safe breast care. To explore the value of an inexpensive method to follow up abnormal test results, we examined a paper-based fail-safe system. We examined a fail-safe system used to follow up abnormal mammograms at a primary care practice at an urban teaching hospital. We analyzed all abnormal mammogram reports and clinicians' responses to follow-up reminders. We characterized potential lapses identified in this system and used regression models to identify patient, provider, and test result characteristics associated with such lapses. Clinicians responded to fail-safe reminders for 92% of 948 abnormal mammograms. Clinicians reported that they were unaware of the abnormal result in 8% of cases and that there was no follow-up plan in place for 3% of cases. Clinicians with more years of experience were more likely to be aware of the abnormal result (odds of being unaware per incremental year in practice, 0.92; 95% confidence interval, 0.88-0.97) and were more likely to have a follow-up plan. A paper-based fail-safe system for abnormal mammograms is feasible in a primary care practice. However, special care is warranted to ensure full clinician adherence and address staff transitions and trainee-related issues.

  2. Prototype data terminal-multiplexer/demultiplexer

    NASA Technical Reports Server (NTRS)

    Leck, D. E.; Goodwin, J. E.

    1972-01-01

    The design and operation of a quad redundant data terminal and a multiplexer/demultiplexer (MDU) is described. The most unique feature is the design of the quad redundant data terminal. This is one of the few designs where the unit is fail/op, fail/op, fail/safe. Laboratory tests confirm that the unit will operate satisfactorily with the failure of three out of four channels. Although the design utilizes state-of-the-art technology, the waveform error checks, the voting techniques, and the parity bit checks are believed to be used in unique configurations. Correct word selection routines are also novel. The MDU design, while not redundant, utilizes, the latest state-of-the-art advantages of light coupler and interested amplifiers. Much of the technology employed was an evolution of prior NASA contracts related to the Addressable Time Division Data System. A good example of the earlier technology development was the development of a low level analog multiplexer, a high level analog multiplexer, and a digital multiplexer. A list of all drawings is included for reference and all schematic, block and timing diagrams are incorporated.

  3. Minimum Control Requirements for Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Boulange, Richard; Jones, Harry; Jones, Harry

    2002-01-01

    Advanced control technologies are not necessary for the safe, reliable and continuous operation of Advanced Life Support (ALS) systems. ALS systems can and are adequately controlled by simple, reliable, low-level methodologies and algorithms. The automation provided by advanced control technologies is claimed to decrease system mass and necessary crew time by reducing buffer size and minimizing crew involvement. In truth, these approaches increase control system complexity without clearly demonstrating an increase in reliability across the ALS system. Unless these systems are as reliable as the hardware they control, there is no savings to be had. A baseline ALS system is presented with the minimal control system required for its continuous safe reliable operation. This baseline control system uses simple algorithms and scheduling methodologies and relies on human intervention only in the event of failure of the redundant backup equipment. This ALS system architecture is designed for reliable operation, with minimal components and minimal control system complexity. The fundamental design precept followed is "If it isn't there, it can't fail".

  4. 77 FR 29857 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... of cabin pressurization and the inability of the fuselage to withstand fail-safe loads. DATES: This... cabin pressurization and the inability of the fuselage to withstand fail-safe loads. (f) Compliance You... reference of certain publications listed in the AD as of June 25, 2012. ADDRESSES: For service information...

  5. 76 FR 82210 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... fuse pins that can fail earlier than the previously determined safe life limit of the pins. A fractured... retract actuator fuse pins that can fail earlier than previously determined safe life limit of the pins. A... Friday, except Federal holidays. For service information identified in this proposed AD, contact Boeing...

  6. 77 FR 37781 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... actuator fuse pins that can fail earlier than the previously determined safe life limit of the pins. A... that can fail earlier than the previously determined safe life limit of the pins. A fractured retract... July 30, 2012. ADDRESSES: For service information identified in this AD, contact Boeing Commercial...

  7. Transportation-Related Safety Behaviors in Top-Grossing Children's Movies from 2008 to 2013.

    PubMed

    Boppana, Shilpa; Shen, Jiabin; Schwebel, David C

    2016-05-01

    Children regularly imitate behavior from movies. The authors assessed injury risk behaviors in top-grossing children's films. The 5 top-grossing G- or PG-rated movies annually from 2008 to 2013 were included, including animated movies and those set in the past/future. Researchers coded transportation scenes for risk taking in 3 domains: protection/equipment, unsafe behaviors, and distraction/attention. Safe and risky behaviors were recorded across the 3 domains. With regard to protection and equipment, 20% of motor vehicle scenes showed characters riding without seat belts and 27% of scenes with motorcycles showed characters riding without helmets. Eighty-nine percent of scenes with horses showed riders without helmets and 67% of boat operators failed to wear personal flotation devices. The most common unsafe behaviors were speeding and unsafe street-crossing. Twenty-one percent of scenes with motor vehicles showed drivers speeding and 90% of pedestrians in films failed to wait for signal changes. Distracted and inattentive behaviors were rare, with distracted driving of motor vehicles occurring in only approximately 2% of total driving scenes. Although many safe transportation behaviors were portrayed, the film industry continues to depict unsafe behaviors in movies designed for pediatric audiences. There is a need for the film industry to continue to balance entertainment and art with modeling of safe behavior for children.

  8. Hard and Soft Safety Verifications

    NASA Technical Reports Server (NTRS)

    Wetherholt, Jon; Anderson, Brenda

    2012-01-01

    The purpose of this paper is to examine the differences between and the effects of hard and soft safety verifications. Initially, the terminology should be defined and clarified. A hard safety verification is datum which demonstrates how a safety control is enacted. An example of this is relief valve testing. A soft safety verification is something which is usually described as nice to have but it is not necessary to prove safe operation. An example of a soft verification is the loss of the Solid Rocket Booster (SRB) casings from Shuttle flight, STS-4. When the main parachutes failed, the casings impacted the water and sank. In the nose cap of the SRBs, video cameras recorded the release of the parachutes to determine safe operation and to provide information for potential anomaly resolution. Generally, examination of the casings and nozzles contributed to understanding of the newly developed boosters and their operation. Safety verification of SRB operation was demonstrated by examination for erosion or wear of the casings and nozzle. Loss of the SRBs and associated data did not delay the launch of the next Shuttle flight.

  9. 30 CFR 77.902-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fail safe ground check circuits; maximum voltage. 77.902-1 Section 77.902-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... ground check circuits; maximum voltage. The maximum voltage used for ground check circuits under § 77.902...

  10. 30 CFR 77.902-1 - Fail safe ground check circuits; maximum voltage.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fail safe ground check circuits; maximum voltage. 77.902-1 Section 77.902-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... ground check circuits; maximum voltage. The maximum voltage used for ground check circuits under § 77.902...

  11. Recent Developments: PKI Square Dish for the Soleras Project

    NASA Technical Reports Server (NTRS)

    Rogers, W. E.

    1984-01-01

    The Square Dish solar collectors are subjected to rigorous design attention regarding corrosion at the site, and certification of the collector structure. The microprocessor controls and tracking mechanisms are improved in the areas of fail safe operations, durability, and low parasitic power requirements. Prototype testing demonstrates performance efficiency of approximately 72% at 730 F outlet temperature. Studies are conducted that include developing formal engineering design studies, developing formal engineering design drawing and fabrication details, establishing subcontracts for fabrication of major components, and developing a rigorous quality control system. The improved design is more cost effective to product and the extensive manuals developed for assembly and operation/maintenance result in faster field assembly and ease of operation.

  12. Recent developments: PKI square dish for the Soleras Project

    NASA Astrophysics Data System (ADS)

    Rogers, W. E.

    1984-03-01

    The Square Dish solar collectors are subjected to rigorous design attention regarding corrosion at the site, and certification of the collector structure. The microprocessor controls and tracking mechanisms are improved in the areas of fail safe operations, durability, and low parasitic power requirements. Prototype testing demonstrates performance efficiency of approximately 72% at 730 F outlet temperature. Studies are conducted that include developing formal engineering design studies, developing formal engineering design drawing and fabrication details, establishing subcontracts for fabrication of major components, and developing a rigorous quality control system. The improved design is more cost effective to product and the extensive manuals developed for assembly and operation/maintenance result in faster field assembly and ease of operation.

  13. Fail-Safe Magnetic Bearing Controller Demonstrated Successfully

    NASA Technical Reports Server (NTRS)

    Choi, Benjamin B.; Provenza, Andrew J.

    2001-01-01

    The Structural Mechanics and Dynamics Branch has successfully demonstrated a fail-safe controller for the Fault-Tolerant Magnetic Bearing rig at the NASA Glenn Research Center. The rotor is supported by two 8-pole redundant radial bearings, and coil failing situations are simulated by manually shutting down their control current commands from the controller cockpit. The effectiveness of the controller was demonstrated when only two active coils from each radial bearing could be used (that is, 14 coils failed). These remaining two coils still levitated the rotor and spun it without losing stability or desired position up to the maximum allowable speed of 20,000 rpm.

  14. Laparoscopic reoperation with total fundoplication for failed Heller myotomy: is it a possible option? Personal experience and review of literature.

    PubMed

    Rossetti, Gianluca; del Genio, Gianmattia; Maffettone, Vincenzo; Fei, Landino; Brusciano, Luigi; Limongelli, Paolo; Pizza, Francesco; Tolone, Salvatore; Di Martino, Maria; del Genio, Federica; del Genio, Alberto

    2009-01-01

    Laparoscopic Heller myotomy with antireflux procedure seems the procedure of choice in the treatment of patients with esophageal achalasia. Persistent or recurrent symptoms occur in 10% to 20% of patients. Few reports on reoperation after failed Heller myotomy have been published. No author has reported the realization of a total fundoplication in these patient groups. The aim of this study is to evaluate the efficacy of laparoscopic reoperation with the realization of a total fundoplication after failed Heller myotomy for esophageal achalasia. From 1992 to December 2007, 5 out of a series of 242 patients (2.1%), along with 2 patients operated elsewhere, underwent laparoscopic reintervention for failed Heller myotomy. Symptoms leading to reoperation included persistent dysphagia in 3 patients, recurrent dysphagia in another 3, and heartburn in 1 patient. Mean time from the first to the second operation was 49.7 months (range, 4-180 months). Always, the intervention was completed via a laparoscopic approach and a Nissen-Rossetti fundoplication was realized or left in place after a complete Heller myotomy. Mean operative time was 160 minutes (range, 60-245 minutes). Mean postoperative hospital stay was 3.1 +/- 1.5 days. No major morbidity or mortality occurred. At a mean follow-up of 16.1 months, reoperation must be considered successful in 5 out of 7 patients (71.4%). The dysphagia DeMeester score fell from 2.71 +/- 0.22 to 0.91 +/- 0.38 postoperatively. The regurgitation score changed from 2.45 +/- 0.34 to 0.68 +/- 0.23. Laparoscopic reoperation for failed Heller myotomy with the realization of a total fundoplication is safe and is associated with good long-term results if performed by an experienced surgeon in a center with a long tradition of esophageal surgery.

  15. Analysis of older adults' domestic kitchen storage practices in the United Kingdom: identification of risk factors associated with listeriosis.

    PubMed

    Evans, Ellen W; Redmond, Elizabeth C

    2015-04-01

    Increased listeriosis incidence among older adults (≥ 60 years) has been reported internationally, with many cases reported to be sporadic and associated with ready-to-eat (RTE) food products with extended refrigerated shelf life. Given that the home kitchen is recognized as a significant location where foodborne illnesses are acquired, it is important that consumers implement safe food practices to minimize risks. This is crucial for vulnerable consumers, such as older adults. Consumer food safety recommendations in the United Kingdom to reduce the risk of listeriosis at home include (i) following "use-by" dates on unopened prepacked RTE food products, (ii) consuming RTE food products within 2 days of opening, and (iii) ensuring the safe operating temperatures of domestic refrigerators (≤ 5 °C). This study utilized observation, self-reporting, and microbiological analysis to determine actual food storage practices to identify behavioral risk factors. A domestic kitchen survey was conducted in older adult (≥ 60 years) consumers' domestic kitchens (n = 100) in South Wales, United Kingdom. Forty-one percent of foods in home refrigerators were beyond the use-by date, of which 11% were unopened RTE food products commonly associated with listeriosis. Sixty-six percent of opened RTE foods had been or were intended to be stored beyond the recommended 2 days after opening. Older adults failed to ensure safe refrigeration temperatures, with 50% of central storage and 85% of door storage areas operating at temperatures >5 °C. Older refrigerators operated at significantly (P < 0.05) higher temperatures. Given that Listeria monocytogenes was isolated in 2% of kitchens, these findings suggest that storage malpractices may have a greater effect on the potential risk of listeriosis than its presence alone. The study has determined that many older adults fail to adhere to recommendations and subject RTE foods associated with L. monocytogenes to prolonged storage at unsafe temperatures which may render food unsafe for consumption.

  16. Evolution of shuttle avionics redundancy management/fault tolerance

    NASA Technical Reports Server (NTRS)

    Boykin, J. C.; Thibodeau, J. R.; Schneider, H. E.

    1985-01-01

    The challenge of providing redundancy management (RM) and fault tolerance to meet the Shuttle Program requirements of fail operational/fail safe for the avionics systems was complicated by the critical program constraints of weight, cost, and schedule. The basic and sometimes false effectivity of less than pure RM designs is addressed. Evolution of the multiple input selection filter (the heart of the RM function) is discussed with emphasis on the subtle interactions of the flight control system that were found to be potentially catastrophic. Several other general RM development problems are discussed, with particular emphasis on the inertial measurement unit RM, indicative of the complexity of managing that three string system and its critical interfaces with the guidance and control systems.

  17. Safe-trajectory optimization and tracking control in ultra-close proximity to a failed satellite

    NASA Astrophysics Data System (ADS)

    Zhang, Jingrui; Chu, Xiaoyu; Zhang, Yao; Hu, Quan; Zhai, Guang; Li, Yanyan

    2018-03-01

    This paper presents a trajectory-optimization method for a chaser spacecraft operating in ultra-close proximity to a failed satellite. Based on the combination of active and passive trajectory protection, the constraints in the optimization framework are formulated for collision avoidance and successful docking in the presence of any thruster failure. The constraints are then handled by an adaptive Gauss pseudospectral method, in which the dynamic residuals are used as the metric to determine the distribution of collocation points. A finite-time feedback control is further employed in tracking the optimized trajectory. In particular, the stability and convergence of the controller are proved. Numerical results are given to demonstrate the effectiveness of the proposed methods.

  18. Space Shuttle Main Engine: Advanced Health Monitoring System

    NASA Technical Reports Server (NTRS)

    Singer, Chirs

    1999-01-01

    The main gola of the Space Shuttle Main Engine (SSME) Advanced Health Management system is to improve flight safety. To this end the new SSME has robust new components to improve the operating margen and operability. The features of the current SSME health monitoring system, include automated checkouts, closed loop redundant control system, catastropic failure mitigation, fail operational/ fail-safe algorithms, and post flight data and inspection trend analysis. The features of the advanced health monitoring system include: a real time vibration monitor system, a linear engine model, and an optical plume anomaly detection system. Since vibration is a fundamental measure of SSME turbopump health, it stands to reason that monitoring the vibration, will give some idea of the health of the turbopumps. However, how is it possible to avoid shutdown, when it is not necessary. A sensor algorithm has been developed which has been exposed to over 400 test cases in order to evaluate the logic. The optical plume anomaly detection (OPAD) has been developed to be a sensitive monitor of engine wear, erosion, and breakage.

  19. A Statistical Simulation Approach to Safe Life Fatigue Analysis of Redundant Metallic Components

    NASA Technical Reports Server (NTRS)

    Matthews, William T.; Neal, Donald M.

    1997-01-01

    This paper introduces a dual active load path fail-safe fatigue design concept analyzed by Monte Carlo simulation. The concept utilizes the inherent fatigue life differences between selected pairs of components for an active dual path system, enhanced by a stress level bias in one component. The design is applied to a baseline design; a safe life fatigue problem studied in an American Helicopter Society (AHS) round robin. The dual active path design is compared with a two-element standby fail-safe system and the baseline design for life at specified reliability levels and weight. The sensitivity of life estimates for both the baseline and fail-safe designs was examined by considering normal and Weibull distribution laws and coefficient of variation levels. Results showed that the biased dual path system lifetimes, for both the first element failure and residual life, were much greater than for standby systems. The sensitivity of the residual life-weight relationship was not excessive at reliability levels up to R = 0.9999 and the weight penalty was small. The sensitivity of life estimates increases dramatically at higher reliability levels.

  20. A fully integrated new paradigm for lithium's mode of action - lithium utilizes latent cellular fail-safe mechanisms.

    PubMed

    van Woerkom, Arthur Ernst

    2017-01-01

    It is proposed that lithium's therapeutic effects occur indirectly by augmenting a cascade of protective "fail-safe" pathways pre-configured to activate in response to a dangerous low cell [Mg ++ ] situation, eg, posttraumatic brain injury, alongside relative cell adenosine triphosphate depletion. Lithium activates cell protection, as it neatly mimics a lowered intracellular [Mg ++ ] level.

  1. A fail safe laser activated switch used as an emergency control link at the Langley Vortex Research Facility

    NASA Technical Reports Server (NTRS)

    Kassel, P. C., Jr.

    1978-01-01

    A fail safe light activated switch was used as an emergency control link at the Langley Vortex Research Facility. In this facility aircraft models were towed through a still air test chamber by a gasoline powered vehicle which was launched from one end of a 427-meter track and attained velocities to 31 m/sec in the test chamber. A 5 mW HeNe laser with a mechanical copper provided a connecting link with the moving tow vehicle on which a silicon photodiode receiver with a specially designed amplifier provided a fail safe switching action. This system provided an emergency means of stopping the vehicle by turning off the laser to interrupt the power to the vehicle ignition and brake release systems.

  2. Enhancing future resilience in urban drainage system: Green versus grey infrastructure.

    PubMed

    Dong, Xin; Guo, Hao; Zeng, Siyu

    2017-11-01

    In recent years, the concept transition from fail-safe to safe-to-fail makes the application of resilience analysis popular in urban drainage systems (UDSs) with various implications and quantifications. However, most existing definitions of UDSs resilience are confined to the severity of flooding, while uncertainties from climate change and urbanization are not considered. In this research, we take into account the functional variety, topological complexity, and disturbance randomness of UDSs and define a new formula of resilience based on three parts of system severity, i.e. social severity affected by urban flooding, environmental severity caused by sewer overflow, and technological severity considering the safe operation of downstream facilities. A case study in Kunming, China is designed to compare the effect of green and grey infrastructure strategies on the enhancement of system resilience together with their costs. Different system configurations with green roofs, permeable pavement and storage tanks are compared by scenario analysis with full consideration of future uncertainties induced by urbanization and climate change. The research contributes to the development of sustainability assessment of urban drainage system with consideration of the resilience of green and grey infrastructure under future change. Finding the response measures with high adaptation across a variety of future scenarios is crucial to establish sustainable urban drainage system in a long term. Copyright © 2017. Published by Elsevier Ltd.

  3. Instrumentation and control system architecture of ECRH SST1

    NASA Astrophysics Data System (ADS)

    Patel, Harshida; Patel, Jatin; purohit, Dharmesh; Shukla, B. K.; Babu, Rajan; Mistry, Hardik

    2017-07-01

    The Electron Cyclotron Resonance Heating (ECRH) system is an important heating system for the reliable start-up of tokamak. The 42GHz and 82.6GHz Gyrotron based ECRH systems are used in tokomaks SST-1 and Aditya to carry out ECRH related experiments. The Gyrotrons are high power microwave tubes used as a source for ECRH systems. The Gyrotrons need to be handled with optimum care right from the installation to its Full parameter control operation. The Gyrotrons are associated with the subsystems like: High voltage power supplies (Beam voltage and anode voltage), dedicated crowbar system, magnet, filament and ion pump power supplies and cooling system. The other subsystems are transmission line, launcher and dummy load. A dedicated VME based data acquisition & control (DAC) system is developed to operate and control the Gyrotron and its associated sub system. For the safe operation of Gyrotron, two level interlocks with fail-safe logic are developed. Slow signals that are operated in scale of millisecond range are programmed through software and hardware interlock in scale of microsecond range are designed and developed indigenously. Water-cooling and the associated interlock are monitored and control by data logger with independent human machine interface.

  4. A View From Space. NASA Systems Engineering and Test

    DTIC Science & Technology

    2014-12-01

    rocket ship called Atlantis came alive. Technology was ubiquitous. There were so many critical components that had to be harmonized. If it weren’t for...notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a...July 8, 2011, affirmed whether every key compo- nent could safely “go for launch.” If any component operated outside its performance enve- lope

  5. Fail-safe designs for large capacity battery systems

    DOEpatents

    Kim, Gi-Heon; Smith, Kandler; Ireland, John; Pesaran, Ahmad A.; Neubauer, Jeremy

    2016-05-17

    Fail-safe systems and design methodologies for large capacity battery systems are disclosed. The disclosed systems and methodologies serve to locate a faulty cell in a large capacity battery, such as a cell having an internal short circuit, determine whether the fault is evolving, and electrically isolate the faulty cell from the rest of the battery, preventing further electrical energy from feeding into the fault.

  6. Diatomite filters--methods of automation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maloney, G.F.

    1966-01-01

    Following an introduction of subject material, diatomite filters are discussed in the following categories: a filter system, the manual station, the decision to automate, equipment, the automated filter, and the fail-safe methods. Diagrams and pictures of the equipment and its operation are included. Many aspects of the uses of both the automatic and manually operated diatomite filtering systems are reviewed. The fully automated station may be ideally suited to the remotely located waterflood since it requires virtually no attention or perhaps only periodic inspection. On the other hand, floods large enough to employ full-time personnel, who can maintain a constantmore » vigil and peiodically scrutinize the filtering operation, probably require nothing more than a semiautomatic operation. The reduction of human error can save money, and the introduction of consistency into any unit operation is certain to be beneficial.« less

  7. The 200-kilowatt wind turbine project

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The three 200 kilowatt wind turbines described, compose the first of three separate systems. Proposed wind turbines of the two other systems, although similar in design, are larger in both physical size and rated power generation. The overall objective of the project is to obtain early operation and performance data while gaining initial experience in the operation of large, horizontal-axis wind turbines in typical utility environments. Several of the key issues addressed include the following: (1) impact of the variable power output (due to varying wind speeds) on the utility grid (2) compatibility with utility requirements (voltage and frequency control of generated power) (3) demonstration of unattended, fail-safe operation (4) reliability of the wind turbine system (5) required maintenance and (6) initial public reaction and acceptance.

  8. Need for Robust Sensors for Inherently Fail-Safe Gas Turbine Engine Controls, Monitoring, and Prognostics (Postprint)

    DTIC Science & Technology

    2006-09-01

    MONITORING , AND PROGNOSTICS Alireza R. Behbahani Controls / Engine Health Management Turbine Engine Division / PRTS U.S. Air Force Research...Technical Report 2005. 8. Greitzer, Frank et al, “Gas Turbine Engine Health Monitoring and Prognostics ”, International Society of Logistics (SOLE...AFRL-PR-WP-TP-2007-217 NEED FOR ROBUST SENSORS FOR INHERENTLY FAIL-SAFE GAS TURBINE ENGINE CONTROLS, MONITORING , AND PROGNOSTICS (POSTPRINT

  9. Turbine vane segment and impingement insert configuration for fail-safe impingement insert retention

    DOEpatents

    Burdgick, Steven Sebastian; Kellock, Iain Robertson

    2003-05-13

    An impingement insert sleeve is provided that is adapted to be disposed in a coolant cavity defined through a stator vane. The insert has a generally open inlet end and first and second pairs of diametrically opposed side walls, and at least one fail-safe tab defined at a longitudinal end of the insert for limiting radial displacement of the insert with respect to the stator vane.

  10. Publication Bias in Meta-Analysis: Confidence Intervals for Rosenthal's Fail-Safe Number.

    PubMed

    Fragkos, Konstantinos C; Tsagris, Michail; Frangos, Christos C

    2014-01-01

    The purpose of the present paper is to assess the efficacy of confidence intervals for Rosenthal's fail-safe number. Although Rosenthal's estimator is highly used by researchers, its statistical properties are largely unexplored. First of all, we developed statistical theory which allowed us to produce confidence intervals for Rosenthal's fail-safe number. This was produced by discerning whether the number of studies analysed in a meta-analysis is fixed or random. Each case produces different variance estimators. For a given number of studies and a given distribution, we provided five variance estimators. Confidence intervals are examined with a normal approximation and a nonparametric bootstrap. The accuracy of the different confidence interval estimates was then tested by methods of simulation under different distributional assumptions. The half normal distribution variance estimator has the best probability coverage. Finally, we provide a table of lower confidence intervals for Rosenthal's estimator.

  11. Publication Bias in Meta-Analysis: Confidence Intervals for Rosenthal's Fail-Safe Number

    PubMed Central

    Fragkos, Konstantinos C.; Tsagris, Michail; Frangos, Christos C.

    2014-01-01

    The purpose of the present paper is to assess the efficacy of confidence intervals for Rosenthal's fail-safe number. Although Rosenthal's estimator is highly used by researchers, its statistical properties are largely unexplored. First of all, we developed statistical theory which allowed us to produce confidence intervals for Rosenthal's fail-safe number. This was produced by discerning whether the number of studies analysed in a meta-analysis is fixed or random. Each case produces different variance estimators. For a given number of studies and a given distribution, we provided five variance estimators. Confidence intervals are examined with a normal approximation and a nonparametric bootstrap. The accuracy of the different confidence interval estimates was then tested by methods of simulation under different distributional assumptions. The half normal distribution variance estimator has the best probability coverage. Finally, we provide a table of lower confidence intervals for Rosenthal's estimator. PMID:27437470

  12. Filter assembly for metallic and intermetallic tube filters

    DOEpatents

    Alvin, Mary Anne; Lippert, Thomas E.; Bruck, Gerald J.; Smeltzer, Eugene E.

    2001-01-01

    A filter assembly (60) for holding a filter element (28) within a hot gas cleanup system pressure vessel is provided, containing: a filter housing (62), said filter housing having a certain axial length and having a peripheral sidewall, said sidewall defining an interior chamber (66); a one piece, all metal, fail-safe/regenerator device (68) within the interior chamber (66) of the filter housing (62) and/or extending beyond the axial length of the filter housing, said device containing an outward extending radial flange (71) within the filter housing for seating an essential seal (70), the device also having heat transfer media (72) disposed inside and screens (80) for particulate removal; one compliant gasket (70) positioned next to and above the outward extending radial flange of the fail-safe/regenerator device; and a porous metallic corrosion resistant superalloy type filter element body welded at the bottom of the metal fail-safe/regenerator device.

  13. Indocyanine green fluorescence-guided parathyroidectomy for primary hyperparathyroidism.

    PubMed

    DeLong, Jonathan C; Ward, Erin P; Lwin, Thinzar M; Brumund, Kevin T; Kelly, Kaitlyn J; Horgan, Santiago; Bouvet, Michael

    2018-02-01

    Our aim was to evaluate the ease and utility of using indocyanine green fluorescence angiography for intraoperative localization of the parathyroid glands. Indocyanine green fluorescence angiography was performed during 60 parathyroidectomies for primary hyperparathyroidism during a 22-month period. Indocyanine green was administered intravenously to guide operative navigation using a commercially available fluorescence imaging system. Video files were graded by 3 independent surgeons for strength of enhancement using an adapted numeric scoring system. There were 46 (77%) female patients and 14 (23%) male patients whose ages ranged from 17 to 87 (average 60) years old. Of the 60 patients, 43 (71.6%) showed strong enhancement, 13 (21.7%) demonstrated mild to moderate vascular enhancement, and 4 (6.7%) exhibited little or no vascular enhancement. Of the 54 patients who had a preoperative sestamibi scan, a parathyroid adenoma was identified in 36, while 18 failed to localize. Of the 18 patients who failed to localize, all 18 patients (100%) had an adenoma that fluoresced on indocyanine green imaging. The operations were performed safely with minimal blood loss and short operative times. Indocyanine green angiography has the potential to assist surgeons in identifying parathyroid glands rapidly with minimal risk. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Optimal Aircraft Control Upset Recovery With and Without Component Failures

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W.; Moerder, Daniel D.

    2002-01-01

    This paper treats the problem of recovering sustainable nondescending (safe) flight in a transport aircraft after one or more of its control effectors fail. Such recovery can be a challenging goal for many transport aircraft currently in the operational fleet for two reasons. First, they have very little redundancy in their means of generating control forces and moments. These aircraft have, as primary control surfaces, a single rudder and pairwise elevators and aileron/spoiler units that provide yaw, pitch, and roll moments with sufficient bandwidth to be used in stabilizing and maneuvering the airframe. Beyond this, throttling the engines can provide additional moments, but on a much slower time scale. Other aerodynamic surfaces, such as leading and trailing edge flaps, are only intended to be placed in a position and left, and are, hence, very slow-moving. Because of this, loss of a primary control surface strongly degrades the controllability of the vehicle, particularly when the failed effector becomes stuck in a non-neutral position where it exerts a disturbance moment that must be countered by the remaining operating effectors. The second challenge in recovering safe flight is that these vehicles are not agile, nor can they tolerate large accelerations. This is of special importance when, at the outset of the recovery maneuver, the aircraft is flying toward the ground, as is frequently the case when there are major control hardware failures. Recovery of safe flight is examined in this paper in the context of trajectory optimization. For a particular transport aircraft, and a failure scenario inspired by an historical air disaster, recovery scenarios are calculated with and without control surface failures, to bring the aircraft to safe flight from the adverse flight condition that it had assumed, apparently as a result of contact with a vortex from a larger aircraft's wake. An effort has been made to represent relevant airframe dynamics, acceleration limits, and actuator limits faithfully, since these contribute to the lack of agility and control power that plays an important role in defining what can be achieved with the vehicle when it is in extremis.

  15. The modified tibial tubercle osteotomy for anterior knee pain due to chondromalacia patellae in adults: A five-year prospective study.

    PubMed

    Jack, C M; Rajaratnam, S S; Khan, H O; Keast-Butler, O; Butler-Manuel, P A; Heatley, F W

    2012-08-01

    To assess the effectiveness of a modified tibial tubercle osteotomy as a treatment for arthroscopically diagnosed chondromalacia patellae. A total of 47 consecutive patients (51 knees) with arthroscopically proven chondromalacia, who had failed conservative management, underwent a modified Fulkerson tibial tubercle osteotomy. The mean age was 34.4 years (19.6 to 52.2). Pre-operatively, none of the patients exhibited signs of patellar maltracking or instability in association with their anterior knee pain. The minimum follow-up for the study was five years (mean 72.6 months (62 to 118)), with only one patient lost to follow-up. A total of 50 knees were reviewed. At final follow-up, the Kujala knee score improved from 39.2 (12 to 63) pre-operatively to 57.7 (16 to 89) post-operatively (p < 0.001). The visual analogue pain score improved from 7.8 (4 to 10) pre-operatively to 5.0 (0 to 10) post-operatively. Overall patient satisfaction with good or excellent results was 72%. Patients with the lowest pre-operative Kujala score benefitted the most. Older patients benefited less than younger ones. The outcome was independent of the grade of chondromalacia. Six patients required screw removal. There were no major complications. We conclude that this modification of the Fulkerson procedure is a safe and useful operation to treat anterior knee pain in well aligned patellofemoral joints due to chondromalacia patellae in adults, when conservative measures have failed.

  16. The modified tibial tubercle osteotomy for anterior knee pain due to chondromalacia patellae in adults

    PubMed Central

    Jack, C. M.; Rajaratnam, S. S.; Khan, H. O.; Keast-Butler, O.; Butler-Manuel, P. A.; Heatley, F. W.

    2012-01-01

    Objectives To assess the effectiveness of a modified tibial tubercle osteotomy as a treatment for arthroscopically diagnosed chondromalacia patellae. Methods A total of 47 consecutive patients (51 knees) with arthroscopically proven chondromalacia, who had failed conservative management, underwent a modified Fulkerson tibial tubercle osteotomy. The mean age was 34.4 years (19.6 to 52.2). Pre-operatively, none of the patients exhibited signs of patellar maltracking or instability in association with their anterior knee pain. The minimum follow-up for the study was five years (mean 72.6 months (62 to 118)), with only one patient lost to follow-up. Results A total of 50 knees were reviewed. At final follow-up, the Kujala knee score improved from 39.2 (12 to 63) pre-operatively to 57.7 (16 to 89) post-operatively (p < 0.001). The visual analogue pain score improved from 7.8 (4 to 10) pre-operatively to 5.0 (0 to 10) post-operatively. Overall patient satisfaction with good or excellent results was 72%. Patients with the lowest pre-operative Kujala score benefitted the most. Older patients benefited less than younger ones. The outcome was independent of the grade of chondromalacia. Six patients required screw removal. There were no major complications. Conclusions We conclude that this modification of the Fulkerson procedure is a safe and useful operation to treat anterior knee pain in well aligned patellofemoral joints due to chondromalacia patellae in adults, when conservative measures have failed. PMID:23610687

  17. Wedge gate valves selecting essentials in pipeline systems designing based on permissible operation parameters

    NASA Astrophysics Data System (ADS)

    Zakirnichnaya, M. M.; Kulsharipov, I. M.

    2017-10-01

    Wedge gate valves are widely used at the fuel and energy complex enterprises. The pipeline valves manufacturers indicate the safe operation resource according to the current regulatory and technical documentation. In this case, the resource value of the valve body strength calculation results is taken into consideration as the main structural part. However, it was determined that the wedge gate valves fail before the assigned resource due to the occurrence of conditions under which the wedge breaks in the hooks and, accordingly, the sealing integrity is not ensured. In this regard, it became necessary to assess the conditions under which the resource should be assigned not only to the valve body, but also to take into account the wedge durability. For this purpose, wedge resource calculations were made using the example of ZKL2 250-25 and ZKL2 300-25 valves using the ABAQUS software package FE-SAFE module under the technological parameters influence on the basis of their stressstrain state calculation results. Operating conditions, under which the wedge resource value is lower than the one set by the manufacturer, were determined. A technique for limiting the operating parameters for ensuring the wedge durability during the wedge gate valve assigned resource is proposed.

  18. Improved Electromagnetic Brake

    NASA Technical Reports Server (NTRS)

    Martin, Toby B.

    2004-01-01

    A proposed design for an electromagnetic brake would increase the reliability while reducing the number of parts and the weight, relative to a prior commercially available electromagnetic brake. The reductions of weight and the number of parts could also lead to a reduction of cost. A description of the commercial brake is prerequisite to a description of the proposed electromagnetic brake. The commercial brake (see upper part of figure) includes (1) a permanent magnet and an electromagnet coil on a stator and (2) a rotor that includes a steel contact plate mounted, with tension spring loading, on an aluminum hub. The stator is mounted securely on a stationary object, which would ordinarily be the housing of a gear drive or a motor. The rotor is mounted on the shaft of the gear drive or motor. The commercial brake nominally operates in a fail-safe (in the sense of normally braking) mode: In the absence of current in the electromagnet coil, the permanent magnet pulls the contact plate, against the spring tension, into contact with the stator. To release the brake, one excites the electromagnet with a current of the magnitude and polarity chosen to cancel the magnetic flux of the permanent magnet, thereby enabling the spring tension to pull the contact plate out of contact with the stator. The fail-safe operation of the commercial brake depends on careful mounting of the rotor in relation to the stator. The rotor/stator gap must be set with a tolerance between 10 and 15 mils (between about 0.25 and about 0.38 mm). If the gap or the contact pad is thicker than the maximum allowable value, then the permanent magnetic field will not be strong enough to pull the steel plate across the gap. (For this reason, any contact pad between the contact plate and the stator must also be correspondingly thin.) If the gap exceeds the maximum allowable value because of shaft end play, it becomes impossible to set the brake by turning off the electromagnet current. Although it may still be possible to set the brake by applying an electromagnet current to aid the permanent magnetic field instead of canceling it, this action can mask an out-of-tolerance condition in the brake and it does not restore the fail-safe function of setting the brake when current is lost.

  19. Alternative Fuels Data Center

    Science.gov Websites

    Autonomous Vehicle (AV) Safe Testing Regulations Arizona state agencies must support the testing fails, the vehicle must be brought to a complete stop or safe state. The Arizona Department of Public

  20. Fail-Safe Design for Large Capacity Lithium-Ion Battery Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, G. H.; Smith, K.; Ireland, J.

    2012-07-15

    A fault leading to a thermal runaway in a lithium-ion battery is believed to grow over time from a latent defect. Significant efforts have been made to detect lithium-ion battery safety faults to proactively facilitate actions minimizing subsequent losses. Scaling up a battery greatly changes the thermal and electrical signals of a system developing a defect and its consequent behaviors during fault evolution. In a large-capacity system such as a battery for an electric vehicle, detecting a fault signal and confining the fault locally in the system are extremely challenging. This paper introduces a fail-safe design methodology for large-capacity lithium-ionmore » battery systems. Analysis using an internal short circuit response model for multi-cell packs is presented that demonstrates the viability of the proposed concept for various design parameters and operating conditions. Locating a faulty cell in a multiple-cell module and determining the status of the fault's evolution can be achieved using signals easily measured from the electric terminals of the module. A methodology is introduced for electrical isolation of a faulty cell from the healthy cells in a system to prevent further electrical energy feed into the fault. Experimental demonstration is presented supporting the model results.« less

  1. Modelling operations and security of cloud systems using Z-notation and Chinese Wall security policy

    NASA Astrophysics Data System (ADS)

    Basu, Srijita; Sengupta, Anirban; Mazumdar, Chandan

    2016-11-01

    Enterprises are increasingly using cloud computing for hosting their applications. Availability of fast Internet and cheap bandwidth are causing greater number of people to use cloud-based services. This has the advantage of lower cost and minimum maintenance. However, ensuring security of user data and proper management of cloud infrastructure remain major areas of concern. Existing techniques are either too complex, or fail to properly represent the actual cloud scenario. This article presents a formal cloud model using the constructs of Z-notation. Principles of the Chinese Wall security policy have been applied to design secure cloud-specific operations. The proposed methodology will enable users to safely host their services, as well as process sensitive data, on cloud.

  2. Regulative recovery in the sea urchin embryo and the stabilizing role of fail-safe gene network wiring

    PubMed Central

    Smith, Joel; Davidson, Eric H.

    2009-01-01

    Design features that ensure reproducible and invariant embryonic processes are major characteristics of current gene regulatory network models. New cis-regulatory studies on a gene regulatory network subcircuit activated early in the development of the sea urchin embryo reveal a sequence of encoded “fail-safe” regulatory devices. These ensure the maintenance of fate separation between skeletogenic and nonskeletogenic mesoderm lineages. An unexpected consequence of the network design revealed in the course of these experiments is that it enables the embryo to “recover” from regulatory interference that has catastrophic effects if this feature is disarmed. A reengineered regulatory system inserted into the embryo was used to prove how this system operates in vivo. Genomically encoded backup control circuitry thus provides the mechanism underlying a specific example of the regulative development for which the sea urchin embryo has long been famous. PMID:19822764

  3. Man-machine interface and control of the shuttle digital flight system

    NASA Technical Reports Server (NTRS)

    Burghduff, R. D.; Lewis, J. L., Jr.

    1985-01-01

    The space shuttle main engine (SSME) presented new requirements in the design of controls for large pump fed liquid rocket engine systems. These requirements were the need for built in full mission support capability, and complexity and flexibility of function not previously needed in this type of application. An engine mounted programmable digital control system was developed to meet these requirements. The engine system and controller and their function are described. Design challenges encountered during the course of development included accommodation for a very severe engine environment, the implementation of redundancy and redundancy management to provide fail operational/fail safe capability, removal of heat from the package, and significant constraints on computer memory size and processing time. The flexibility offered by programmable control reshaped the approach to engine design and development and set the pattern for future controls development in these types of applications.

  4. Investigation of structural factors of safety for the space shuttle

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A study was made of the factors governing the structural design of the fully reusable space shuttle booster to establish a rational approach to select optimum structural factors of safety. The study included trade studies of structural factors of safety versus booster service life, weight, cost, and reliability. Similar trade studies can be made on other vehicles using the procedures developed. The major structural components of a selected baseline booster were studied in depth, each being examined to determine the fatigue life, safe-life, and fail-safe capabilities of the baseline design. Each component was further examined to determine its reliability and safety requirements, and the change of structural weight with factors of safety. The apparent factors of safety resulting from fatigue, safe-life, proof test, and fail-safe requirements were identified. The feasibility of reduced factors of safety for design loads such as engine thrust, which are well defined, was examined.

  5. New advances in non-dispersive IR technology for CO2 detection

    NASA Technical Reports Server (NTRS)

    Small, John W.; Odegard, Wayne L.

    1988-01-01

    This paper discusses new technology developments in CO2 detection using Non-Dispersive Infrared (NDIR) techniques. The method described has successfully been used in various applications and environments. It has exhibited extremely reliable long-term stability without the need of routine calibration. The analysis employs a dual wavelength, differential detection approach with compensating circuitry for component aging and dirt accumulation on optical surfaces. The instrument fails 'safe' and provides the operator with a 'fault' alarm in the event of a system failure. The NDIR analyzer described has been adapted to NASA Space Station requirements.

  6. Hyaluronic acid-green tea catechin micellar nanocomplexes: Fail-safe cisplatin nanomedicine for the treatment of ovarian cancer without off-target toxicity.

    PubMed

    Bae, Ki Hyun; Tan, Susi; Yamashita, Atsushi; Ang, Wei Xia; Gao, Shu Jun; Wang, Shu; Chung, Joo Eun; Kurisawa, Motoichi

    2017-12-01

    The green tea catechin, (-)-epigallocatechin-3-O-gallate (EGCG), has gained significant attention as a potent adjuvant to enhance the antitumor efficacy of cisplatin while mitigating its harmful side effects. Herein we report the development of a fail-safe cisplatin nanomedicine constructed with hyaluronic acid-EGCG conjugate for ovarian cancer therapy. A simple mixing of this conjugate and cisplatin induces spontaneous self-assembly of micellar nanocomplexes having a spherical core-shell structure. The surface-exposed hyaluronic acid enables efficient delivery of cisplatin into CD44-overexpressing cancer cells via receptor-mediated endocytosis whereas the internally packed EGCG moieties offer an environment favorable for the encapsulation of cisplatin. In addition, the antioxidant effect of EGCG moieties ensures fail-safe protection against off-target organ toxicity originating from cisplatin-evoked oxidative stress. Pharmacokinetic and biodistribution studies reveal the prolonged blood circulation and preferential tumor accumulation of intravenously administered nanocomplexes. Moreover, the nanocomplexes exhibit superior antitumor efficacy over free cisplatin while displaying no toxicity in both a subcutaneous xenograft model and peritoneal metastatic model of human ovarian cancer. Our findings demonstrate proof of concept for the feasibility of green tea catechin-based micellar nanocomplexes as a safe and effective cisplatin nanomedicine for ovarian cancer treatment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. The AP1000{sup R} nuclear power plant innovative features for extended station blackout mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vereb, F.; Winters, J.; Schulz, T.

    2012-07-01

    Station Blackout (SBO) is defined as 'a condition wherein a nuclear power plant sustains a loss of all offsite electric power system concurrent with turbine trip and unavailability of all onsite emergency alternating current (AC) power system. Station blackout does not include the loss of available AC power to buses fed by station batteries through inverters or by alternate AC sources as defined in this section, nor does it assume a concurrent single failure or design basis accident...' in accordance with Reference 1. In this paper, the innovative features of the AP1000 plant design are described with their operation inmore » the scenario of an extended station blackout event. General operation of the passive safety systems are described as well as the unique features which allow the AP1000 plant to cope for at least 7 days during station blackout. Points of emphasis will include: - Passive safety system operation during SBO - 'Fail-safe' nature of key passive safety system valves; automatically places the valve in a conservatively safe alignment even in case of multiple failures in all power supply systems, including normal AC and battery backup - Passive Spent Fuel Pool cooling and makeup water supply during SBO - Robustness of AP1000 plant due to the location of key systems, structures and components required for Safe Shutdown - Diverse means of supplying makeup water to the Passive Containment Cooling System (PCS) and the Spent Fuel Pool (SFP) through use of an engineered, safety-related piping interface and portable equipment, as well as with permanently installed onsite ancillary equipment. (authors)« less

  8. Redundant electronic circuit provides fail-safe control

    NASA Technical Reports Server (NTRS)

    Archer, J. W.

    1970-01-01

    Circuit using dual control amplifiers and dual position demand potentiometers powered from separate sources is used for reliable hydraulic valve controller that prevents closure of valve when control circuits fail, and maintains valve control to close tolerance for more common modes of controller failure.

  9. Call sign intelligibility improvement using a spatial auditory display

    NASA Technical Reports Server (NTRS)

    Begault, Durand R.

    1994-01-01

    A spatial auditory display was designed for separating the multiple communication channels usually heard over one ear to different virtual auditory positions. The single 19 foot rack mount device utilizes digital filtering algorithms to separate up to four communication channels. The filters use four different binaural transfer functions, synthesized from actual outer ear measurements, to impose localization cues on the incoming sound. Hardware design features include 'fail-safe' operation in the case of power loss, and microphone/headset interfaces to the mobile launch communication system in use at KSC. An experiment designed to verify the intelligibility advantage of the display used 130 different call signs taken from the communications protocol used at NASA KSC. A 6 to 7 dB intelligibility advantage was found when multiple channels were spatially displayed, compared to monaural listening. The findings suggest that the use of a spatial auditory display could enhance both occupational and operational safety and efficiency of NASA operations.

  10. 78 FR 20604 - Enhanced Document Requirements To Support Use of the Dolphin Safe Label on Tuna Products

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Commission Act for including a dolphin-safe label on tuna product in the United States that fails to meet the.... 130221153-3153-01] RIN 0648-BC78 Enhanced Document Requirements To Support Use of the Dolphin Safe Label on Tuna Products AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric...

  11. Universal power transistor base drive control unit

    DOEpatents

    Gale, Allan R.; Gritter, David J.

    1988-01-01

    A saturation condition regulator system for a power transistor which achieves the regulation objectives of a Baker clamp but without dumping excess base drive current into the transistor output circuit. The base drive current of the transistor is sensed and used through an active feedback circuit to produce an error signal which modulates the base drive current through a linearly operating FET. The collector base voltage of the power transistor is independently monitored to develop a second error signal which is also used to regulate base drive current. The current-sensitive circuit operates as a limiter. In addition, a fail-safe timing circuit is disclosed which automatically resets to a turn OFF condition in the event the transistor does not turn ON within a predetermined time after the input signal transition.

  12. Universal power transistor base drive control unit

    DOEpatents

    Gale, A.R.; Gritter, D.J.

    1988-06-07

    A saturation condition regulator system for a power transistor is disclosed which achieves the regulation objectives of a Baker clamp but without dumping excess base drive current into the transistor output circuit. The base drive current of the transistor is sensed and used through an active feedback circuit to produce an error signal which modulates the base drive current through a linearly operating FET. The collector base voltage of the power transistor is independently monitored to develop a second error signal which is also used to regulate base drive current. The current-sensitive circuit operates as a limiter. In addition, a fail-safe timing circuit is disclosed which automatically resets to a turn OFF condition in the event the transistor does not turn ON within a predetermined time after the input signal transition. 2 figs.

  13. Shape Control of Solar Collectors Using Shape Memory Alloy Actuators

    NASA Technical Reports Server (NTRS)

    Lobitz, D. W.; Grossman, J. W.; Allen, J. J.; Rice, T. M.; Liang, C.; Davidson, F. M.

    1996-01-01

    Solar collectors that are focused on a central receiver are designed with a mechanism for defocusing the collector or disabling it by turning it out of the path of the sun's rays. This is required to avoid damaging the receiver during periods of inoperability. In either of these two cases a fail-safe operation is very desirable where during power outages the collector passively goes to its defocused or deactivated state. This paper is principally concerned with focusing and defocusing the collector in a fail-safe manner using shape memory alloy actuators. Shape memory alloys are well suited to this application in that once calibrated the actuators can be operated in an on/off mode using a minimal amount of electric power. Also, in contrast to other smart materials that were investigated for this application, shape memory alloys are capable of providing enough stroke at the appropriate force levels to focus the collector. Design and analysis details presented, along with comparisons to test data taken from an actual prototype, demonstrate that the collector can be repeatedly focused and defocused within accuracies required by typical solar energy systems. In this paper the design, analysis and testing of a solar collector which is deformed into its desired shape by shape memory alloy actuators is presented. Computations indicate collector shapes much closer to spherical and with smaller focal lengths can be achieved by moving the actuators inward to a radius of approximately 6 inches. This would require actuators with considerably more stroke and some alternate SMA actuators are currently under consideration. Whatever SMA actuator is finally chosen for this application, repeatability and fatigue tests will be required to investigate the long term performance of the actuator.

  14. Respiratory transfer value has fail-safe feature

    NASA Technical Reports Server (NTRS)

    Puccinelli, A. A.; Smith, J. R., Jr.

    1965-01-01

    Quick-acting, remote controlled valve connects either one of two oxygen or air supplies to a breathing tube. The valve, which is fall-safe, incorporates a cammed piston arrangement that is driven by a remote controlled reversible rotary solenoid or reversible electric motor.

  15. Fail-safe storage rack for irradiated fuel rod assemblies

    DOEpatents

    Lewis, D.R.

    1993-03-23

    A fail-safe storage rack is provided for interim storage of spent but radioactive nuclear fuel rod assemblies. The rack consists of a checkerboard array of substantially square, elongate receiving tubes fully enclosed by a double walled container, the outer wall of which is imperforate for liquid containment and the inner wall of which is provided with perforations for admitting moderator liquid flow to the elongate receiving tubes, the liquid serving to take up waste heat from the stored nuclear assemblies and dissipate same to the ambient liquid reservoir. A perforated cover sealing the rack facilitates cooling liquid entry and dissipation.

  16. Fail-safe storage rack for irradiated fuel rod assemblies

    DOEpatents

    Lewis, Donald R.

    1993-01-01

    A fail-safe storage rack is provided for interim storage of spent but radioactive nuclear fuel rod assemblies. The rack consists of a checkerboard array of substantially square, elongate receiving tubes fully enclosed by a double walled container, the outer wall of which is imperforate for liquid containment and the inner wall of which is provided with perforations for admitting moderator liquid flow to the elongate receiving tubes, the liquid serving to take up waste heat from the stored nuclear assemblies and dissipate same to the ambient liquid reservoir. A perforated cover sealing the rack facilitates cooling liquid entry and dissipation.

  17. Magnetic fluid control for viscous loss reduction of high-speed MRF brakes and clutches with well-defined fail-safe behavior

    NASA Astrophysics Data System (ADS)

    Güth, Dirk; Schamoni, Markus; Maas, Jürgen

    2013-09-01

    No-load losses within brakes and clutches based on magnetorheological fluids are unavoidable and represent a major barrier towards their wide-spread commercial adoption. Completely torque free rotation is not yet possible due to persistent fluid contact within the shear gap. In this paper, a novel concept is presented that facilitates the controlled movement of the magnetorheological fluid from an active, torque-transmitting region into an inactive region of the shear gap. This concept enables complete decoupling of the fluid engaging surfaces such that viscous drag torque can be eliminated. In order to achieve the desired effect, motion in the magnetorheological fluid is induced by magnetic forces acting on the fluid, which requires an appropriate magnetic circuit design. In this investigation, we propose a methodology to determine suitable magnetic circuit designs with well-defined fail-safe behavior. The magnetically induced motion of magnetorheological fluids is modeled by the use of the Kelvin body force, and a multi-physics domain simulation is performed to elucidate various transitions between an engaged and disengaged operating mode. The modeling approach is validated by captured high-speed video frames which show the induced motion of the magnetorheological fluid due to the magnetic field. Finally, measurements performed with a prototype actuator prove that the induced viscous drag torque can be reduced significantly by the proposed magnetic fluid control methodology.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hagen, E.W.

    This report reviews and evaluates the performance of the compressed-air and pressurized-nitrogen gas systems in commercial nuclear power units. The information was collected from readily available operating experiences, licensee event reports, system designs in safety analysis reports, and regulatory documents. The results are collated and analyzed for significance and impact on power plant safety performance. Under certain circumstances, the fail-safe philosophy for a piece of equipment or subsystem of the compressed-air systems initiated a series of actions culminating in reactor transient or unit scram. However, based on this study of prevailing operating experiences, reclassifying the compressed-gas systems to a highermore » safety level will neither prevent (nor mitigate) the reoccurrences of such happenings nor alleviate nuclear power plant problems caused by inadequate maintenance, operating procedures, and/or practices. Conversely, because most of the problems were derived from the sources listed previously, upgrading of both maintenance and operating procedures will not only result in substantial improvement in the performance and availability of the compressed-air (and backup nitrogen) systems but in improved overall plant performance.« less

  19. Fail-safe transcription termination: Because one is never enough.

    PubMed

    Lemay, Jean-François; Bachand, François

    2015-01-01

    Termination of RNA polymerase II (RNAPII) transcription is a fundamental step of gene expression that involves the release of the nascent transcript and dissociation of RNAPII from the DNA template. As transcription termination is intimately linked to RNA 3' end processing, termination pathways have a key decisive influence on the fate of the transcribed RNA. Quite remarkably, when reaching the 3' end of genes, a substantial fraction of RNAPII fail to terminate transcription, requiring the contribution of alternative or "fail-safe" mechanisms of termination to release the polymerase. This point of view covers redundant mechanisms of transcription termination and how they relate to conventional termination models. In particular, we expand on recent findings that propose a reverse torpedo model of termination, in which the 3'5' exonucleolytic activity of the RNA exosome targets transcription events associated with paused and backtracked RNAPII.

  20. Safer Liquid Natural Gas

    NASA Technical Reports Server (NTRS)

    1976-01-01

    After the disaster of Staten Island in 1973 where 40 people were killed repairing a liquid natural gas storage tank, the New York Fire Commissioner requested NASA's help in drawing up a comprehensive plan to cover the design, construction, and operation of liquid natural gas facilities. Two programs are underway. The first transfers comprehensive risk management techniques and procedures which take the form of an instruction document that includes determining liquid-gas risks through engineering analysis and tests, controlling these risks by setting up redundant fail safe techniques, and establishing criteria calling for decisions that eliminate or accept certain risks. The second program prepares a liquid gas safety manual (the first of its kind).

  1. Vehicle electrical system state controller

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissontz, Jay E.

    A motor vehicle electrical power distribution system includes a plurality of distribution sub-systems, an electrical power storage sub-system and a plurality of switching devices for selective connection of elements of and loads on the power distribution system to the electrical power storage sub-system. A state transition initiator provides inputs to control system operation of switching devices to change the states of the power distribution system. The state transition initiator has a plurality of positions selection of which can initiate a state transition. The state transition initiator can emulate a four position rotary ignition switch. Fail safe power cutoff switches providemore » high voltage switching device protection.« less

  2. 75 FR 26883 - Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 170 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... slat actuator structural failure (rupture) and its adjacent actuator torque limiter failing high... outboard slat actuator structural failure (rupture) and its adjacent actuator torque limiter failing high... requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in...

  3. Failure detection and isolation investigation for strapdown skew redundant tetrad laser gyro inertial sensor arrays

    NASA Technical Reports Server (NTRS)

    Eberlein, A. J.; Lahm, T. G.

    1976-01-01

    The degree to which flight-critical failures in a strapdown laser gyro tetrad sensor assembly can be isolated in short-haul aircraft after a failure occurrence has been detected by the skewed sensor failure-detection voting logic is investigated along with the degree to which a failure in the tetrad computer can be detected and isolated at the computer level, assuming a dual-redundant computer configuration. The tetrad system was mechanized with two two-axis inertial navigation channels (INCs), each containing two gyro/accelerometer axes, computer, control circuitry, and input/output circuitry. Gyro/accelerometer data is crossfed between the two INCs to enable each computer to independently perform the navigation task. Computer calculations are synchronized between the computers so that calculated quantities are identical and may be compared. Fail-safe performance (identification of the first failure) is accomplished with a probability approaching 100 percent of the time, while fail-operational performance (identification and isolation of the first failure) is achieved 93 to 96 percent of the time.

  4. KSC-99pp1287

    NASA Image and Video Library

    1999-11-05

    KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39B, the payload canister for Space Shuttle Discovery, for mission STS-103, is lifted up the Rotating Service Structure. Installation of the payload into Discovery is slated for Friday, Nov. 12. The mission is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  5. 77 FR 24362 - Airworthiness Directives; Bombardier, Inc. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... was prompted by reports of the air driven generator (ADG) failing to power essential buses during... essential buses which, in the event of an emergency, could prevent continued safe flight. DATES: This AD... prevent continued safe flight. This [TCCA] directive mandates the replacement of the ADG GCU. You may...

  6. Modified hydraulic braking system limits angular deceleration to safe values

    NASA Technical Reports Server (NTRS)

    Briggs, R. S.; Council, M.; Green, P. M.

    1966-01-01

    Conventional spring actuated, hydraulically released, fail-safe disk braking system is modified to control the angular deceleration of a massive antenna. The hydraulic system provides an immediate preset pressure to the spring-loaded brake shoes and holds it at this value to decelerate the antenna at the desired rate.

  7. A 0.2 V Micro-Electromechanical Switch Enabled by a Phase Transition.

    PubMed

    Dong, Kaichen; Choe, Hwan Sung; Wang, Xi; Liu, Huili; Saha, Bivas; Ko, Changhyun; Deng, Yang; Tom, Kyle B; Lou, Shuai; Wang, Letian; Grigoropoulos, Costas P; You, Zheng; Yao, Jie; Wu, Junqiao

    2018-04-01

    Micro-electromechanical (MEM) switches, with advantages such as quasi-zero leakage current, emerge as attractive candidates for overcoming the physical limits of complementary metal-oxide semiconductor (CMOS) devices. To practically integrate MEM switches into CMOS circuits, two major challenges must be addressed: sub 1 V operating voltage to match the voltage levels in current circuit systems and being able to deliver at least millions of operating cycles. However, existing sub 1 V mechanical switches are mostly subject to significant body bias and/or limited lifetimes, thus failing to meet both limitations simultaneously. Here 0.2 V MEM switching devices with ≳10 6 safe operating cycles in ambient air are reported, which achieve the lowest operating voltage in mechanical switches without body bias reported to date. The ultralow operating voltage is mainly enabled by the abrupt phase transition of nanolayered vanadium dioxide (VO 2 ) slightly above room temperature. The phase-transition MEM switches open possibilities for sub 1 V hybrid integrated devices/circuits/systems, as well as ultralow power consumption sensors for Internet of Things applications. © 2018 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  8. Concurrent criterion validity of the safe driving behavior measure: a predictor of on-road driving outcomes.

    PubMed

    Classen, Sherrilene; Wang, Yanning; Winter, Sandra M; Velozo, Craig A; Lanford, Desiree N; Bédard, Michel

    2013-01-01

    We determined the concurrent criterion validity of the Safe Driving Behavior Measure (SDBM) for on-road outcomes (passing or failing the on-road test as determined by a certified driving rehabilitation specialist) among older drivers and their family members-caregivers. On the basis of ratings from 168 older drivers and 168 family members-caregivers, we calculated receiver operating characteristic curves. The drivers' area under the curve (AUC) was .620 (95% confidence interval [CI] = .514-.725, p = .043). The family members-caregivers' AUC was .726 (95% CI = .622-.829, p ≤ .01). Older drivers' ratings showed statistically significant yet poor concurrent criterion validity, but family members-caregivers' ratings showed good concurrent criterion validity for the criterion on-road driving test. Continuing research with a more representative sample is being pursued to confirm the SDBM's concurrent criterion validity. This screening tool may be useful for generalist practitioners to use in making decisions regarding driving. Copyright © 2013 by the American Occupational Therapy Association, Inc.

  9. Per-Oral Endoscopic Myotomy (POEM) After Previous Laparoscopic Heller Myotomy Is Feasible and Safe in a Porcine Model.

    PubMed

    Miles, Luke F; Frelich, Matthew J; Gould, Jon C; Dua, Kulwinder S; Jensen, Eric S; Kastenmeier, Andrew S

    2015-10-01

    We sought to evaluate the feasibility, safety, and difficulty of performing the per-oral endoscopic myotomy (POEM) procedure in the setting of a prior Heller myotomy using a survival porcine model. Four pigs underwent laparoscopic Heller myotomy with Dor partial anterior fundoplication followed by the POEM performed 4 weeks later. Two additional pigs served as controls, undergoing only the POEM. All procedures were completed without complications. The revisional POEM was not significantly more difficult than POEM controls based on procedure time, POEM procedure components, or procedure difficulty scores. Revisional POEM had a longer mean operative time when compared with Heller myotomy (126.0 vs. 83.8 min; P<0.01) but had a lower total difficulty score (28.6 vs. 52.1; P≪0.01). A POEM after previous Heller myotomy is safe and feasible in the porcine model and has potential as an option for patients suffering from recurrent or persistent symptoms after failed surgical myotomy.

  10. Concurrent Criterion Validity of the Safe Driving Behavior Measure: A Predictor of On-Road Driving Outcomes

    PubMed Central

    Wang, Yanning; Winter, Sandra M.; Velozo, Craig A.; Lanford, Desiree N.; Bédard, Michel

    2013-01-01

    We determined the concurrent criterion validity of the Safe Driving Behavior Measure (SDBM) for on-road outcomes (passing or failing the on-road test as determined by a certified driving rehabilitation specialist) among older drivers and their family members–caregivers. On the basis of ratings from 168 older drivers and 168 family members–caregivers, we calculated receiver operating characteristic curves. The drivers’ area under the curve (AUC) was .620 (95% confidence interval [CI] = .514–.725, p = .043). The family members–caregivers’ AUC was .726 (95% CI = .622–.829, p ≤ .01). Older drivers’ ratings showed statistically significant yet poor concurrent criterion validity, but family members–caregivers’ ratings showed good concurrent criterion validity for the criterion on-road driving test. Continuing research with a more representative sample is being pursued to confirm the SDBM’s concurrent criterion validity. This screening tool may be useful for generalist practitioners to use in making decisions regarding driving. PMID:23245789

  11. Single port laparoscopic right hemicolectomy for ileocolic intussusception

    PubMed Central

    Chen, Jia-Hui; Wu, Jhe-Syun

    2013-01-01

    A 36-year-old male was admitted with right lower abdominal pain and diarrhea for more than 3 mo. Colonoscopy and a barium enema study revealed a submucosal tumor over the cecum, but computed tomography showed an ileal lipoma. There was no definitive diagnosis preoperatively, but ileocolic intussusception was noted during surgery. Single port laparoscopic radical right hemicolectomy was performed because intra-operative reduction failed. The histological diagnosis of the resected tumor was lipoma. Single port laparoscopic surgery has recently been proven to be safe and feasible. There are advantages compared with conventional laparoscopic surgery, such as smaller incision wounds, fewer port site complications, and easier conversion. However, there are some drawbacks which need to be overcome, such as difficulties in triangulation and instrument clashing. If there are no contraindications to laparoscopy, single port laparoscopic surgery can be performed safely and should be considered for diagnosis and treatment of intussusception in adults. Here, we report the first case of ileocolic intussusception successfully treated by single port laparoscopic surgery. PMID:23538552

  12. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  13. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  14. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  15. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  16. 75 FR 21528 - Airworthiness Directives; McDonnell Douglas Corporation Model MD-90-30 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... subsequently damage the hydraulic system and adversely affect the airplane's ability to make a safe landing... cylinder support fitting for the MLG failing during gear extension and subsequently damaging the hydraulic... the retract cylinder support fitting for the MLG, which could adversely affect the airplane's safe...

  17. Evaluating the Use of Tissue Oximetry to Decrease Intensive Unit Monitoring for Free Flap Breast Reconstruction.

    PubMed

    Ricci, Joseph A; Vargas, Christina R; Ho, Olivia A; Lin, Samuel J; Tobias, Adam M; Lee, Bernard T

    2017-07-01

    Postoperative free flap care has historically required intensive monitoring for 24 hours in an intensive care unit. Continuous monitoring with tissue oximetry has allowed earlier detection of vascular compromise, decreasing flap loss and improving salvage. This study aims to identify whether a fast-track postoperative paradigm can be safely used with tissue oximetry to decrease intensive monitoring and costs. All consecutive microsurgical breast reconstructions performed at a single institution were reviewed (2008-2014) and cases requiring return to the operating room were identified. Data evaluated included patient demographics, the take back time course, and complications of flap loss and salvage. A cost-benefit analysis was performed to analyse the utility of a postoperative intensive monitoring setting. There were 900 flaps performed and 32 required an unplanned return to the operating room. There were 16 flaps that required a reexploration within the first 24 hours; the standard length of intensive unit monitoring. After 4 hours, there were 7 flaps (44%) detected by tissue oximetry for reexploration. After 15 hours of intensive monitoring postoperatively, cost analysis revealed that the majority (15/16; 94%) of failing flaps had been identified and the cost of identifying each subsequent failing flap exceeded the cost of another hour of intensive monitoring. The postoperative paradigm for microsurgical flaps has historically required intensive unit monitoring. Using tissue oximetry, a fast-track pathway can reduce time spent in an intensive monitoring setting from 24 to 15 hours with significant cost savings and minimal risk of missing a failing free flap.

  18. Non-operative management of right side thoracoabdominal penetrating injuries--the value of testing chest tube effluent for bile.

    PubMed

    De Rezende Neto, João Baptista; Guimarães, Tiago Nunes; Madureira, João Lopo; Drumond, Domingos André Fernandes; Leal, Juliana Campos; Rocha, Aroldo; Oliveira, Rodrigo Guimarães; Rizoli, Sandro B

    2009-05-01

    While mandatory surgery for all thoracoabdominal penetrating injuries is advocated by some, the high rate of unnecessary operations challenges this approach. However, the consequences of intrathoracic bile remains poorly investigated. We sought to evaluate the outcome of patients who underwent non-operative management of right side thoracoabdominal (RST) penetrating trauma, and the levels of bilirubin obtained from those patients' chest tube effluent. We managed non-operatively all stable patients with a single RST penetrating injury. Chest tube effluent samples were obtained six times within (4-8 h; 12-16 h; 20-24 h; 28-32 h; 36-40 h; 48 h and 72 h) of admission for bilirubin measurement and blood for complete blood count, bilirubin, alanine (ALT) and aspartate aminotransferases (AST) assays. For comparison we studied patients with single left thoracic penetrating injury. Forty-two patients with RST injuries were included. All had liver and lung injuries confirmed by CT scans. Only one patient failed non-operative management. Chest tube bilirubin peaked at 48 h post-trauma (mean 3.3+/-4.1 mg/dL) and was always higher than both serum bilirubin (p<0.05) and chest tube effluent from control group (27 patients with left side thoracic trauma). Serum ALT and AST were higher in RST injury patients (p<0.05). One RST injury patient died of line sepsis. Non-operative management of RST penetrating trauma appears to be safe. Bile originating from the liver injury reaches the right thoracic cavity but does not reflect the severity of that injury. The highest concentration was found in the patient failing non-operative management. The presence of intrathoracic bile in selected patients who sustain RST penetrating trauma, with liver injury, does not preclude non-operative management. Our study suggests that monitoring chest tube effluent bilirubin may provide helpful information when managing a patient non-operatively.

  19. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  20. Surgery for failed cervical spine reconstruction.

    PubMed

    Helgeson, Melvin D; Albert, Todd J

    2012-03-01

    Review article. To review the indications, operative strategy, and complications of revision cervical spine reconstruction. With many surgeons expanding their indications for cervical spine surgery, the number of patients being treated operatively has increased. Unfortunately, the number of patients requiring revision procedures is also increasing, but very little literature exists reviewing changes in the indications or operative planning for revision reconstruction. Narrative and review of the literature. In addition to the well-accepted indications for primary cervical spine surgery (radiculopathy, myelopathy, instability, and tumor), we have used the following indications for revision surgery: pseudarthrosis, adjacent segment degeneration, inadequate decompression, iatrogenic instability, and deformity. Our surgical goal for pseudarthrosis is obviously to obtain a fusion, which can usually be performed with an approach not done previously. Our surgical goals for instability and deformity are more complex, with a focus on decompression of any neurologic compression, correction of deformity, and stability. Revision cervical spine reconstruction is safe and effective if performed for the appropriate indications and with proper planning.

  1. Setting the Clock for Fail-Safe Early Embryogenesis.

    PubMed

    Fickentscher, Rolf; Struntz, Philipp; Weiss, Matthias

    2016-10-28

    The embryogenesis of the small nematode Caenorhabditis elegans is a remarkably robust self-organization phenomenon. Cell migration trajectories in the early embryo, for example, are well explained by mechanical cues that push cells into positions where they experience the least repulsive forces. Yet, how this mechanically guided progress in development is properly timed has remained elusive so far. Here, we show that cell volumes and division times are strongly anticorrelated during the early embryogenesis of C. elegans with significant differences between somatic cells and precursors of the germline. Our experimental findings are explained by a simple model that in conjunction with mechanical guidance can account for the fail-safe early embryogenesis of C. elegans.

  2. High Reliability Engine Control Demonstrated for Aircraft Engines

    NASA Technical Reports Server (NTRS)

    Guo, Ten-Huei

    1999-01-01

    For a dual redundant-control system, which is typical for short-haul aircraft, if a failure is detected in a control sensor, the engine control is transferred to a safety mode and an advisory is issued for immediate maintenance action to replace the failed sensor. The safety mode typically results in severely degraded engine performance. The goal of the High Reliability Engine Control (HREC) program was to demonstrate that the neural-network-based sensor validation technology can safely operate an engine by using the nominal closed-loop control during and after sensor failures. With this technology, engine performance could be maintained, and the sensor could be replaced as a conveniently scheduled maintenance action.

  3. Technology of civil usage of composites. [in commercial aircraft structures

    NASA Technical Reports Server (NTRS)

    Kemp, D. E.

    1977-01-01

    The paper deals with the use of advanced composites in structural components of commercial aircraft. The need for testing the response of a material system to service environment is discussed along with methods for evaluating design and manufacturing aspects of a built-up structure under environmental conditions and fail-safe (damage-tolerance) evaluation of structures. Crashworthiness aspects, the fire-hazard potential, and electrical damage of composite structures are considered. Practical operational experience with commercial aircraft is reviewed for boron/epoxy foreflaps, Kevlar/epoxy fillets and fairings, graphite/epoxy spoilers, graphite/polysulfone spoilers, graphite/epoxy floor posts, boron/aluminum aft pylon skin panels, graphite/epoxy engine nose cowl outer barrels, and graphite/epoxy upper aft rudder segments.

  4. Gene Kranz Visits Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    2006-01-01

    On October 19, 2006, former NASA director of Mission Operations Gene Kranz was a keynote speaker at the Marshall Space Flight Center's (MSFC's) 2006 Annual Safety Day program. The best selling author of 'Failure Is Not An Option' and past Apollo flight director was featured during a morning session called 'Coffee and Kranz'. Marshall employees hung on his every word as he told the fascinating story of Apollo 13. Kranz was the acting flight director during the Apollo 13 mission, a mission that seemed doomed to fail due to an onboard explosion. Kranz and his flight control team worked around the clock relentlessly, solving problem after problem, until the crew was returned safely to Earth.

  5. Around Marshall

    NASA Image and Video Library

    2006-10-19

    On October 19, 2006, former NASA director of Mission Operations Gene Kranz was a keynote speaker at the Marshall Space Flight Center’s (MSFC’s) 2006 Annual Safety Day program. The best selling author of “Failure Is Not An Option” and past Apollo flight director was featured during a morning session called “Coffee and Kranz”. Marshall employees hung on his every word as he told the fascinating story of Apollo 13. Kranz was the acting flight director during the Apollo 13 mission, a mission that seemed doomed to fail due to an onboard explosion. Kranz and his flight control team worked around the clock relentlessly, solving problem after problem, until the crew was returned safely to Earth.

  6. Design, Development, and Evaluation of a Novel Retraction Device for Gallbladder Extraction During Laparoscopic Cholecystectomy

    PubMed Central

    Judge, Joshua M.; Stukenborg, George J.; Johnston, William F.; Guilford, William H.; Slingluff, Craig L.; Hallowell, Peter T.

    2015-01-01

    Background A source of frustration during laparoscopic cholecystectomy involves extraction of the gallbladder through port sites smaller than the gallbladder itself. We describe the development and testing of a novel device for the safe, minimal enlargement of laparoscopic port sites to extract large, stone-filled gallbladders from the abdomen. Methods The study device consists of a handle with a retraction tongue to shield the specimen and a guide for a scalpel to incise the fascia within the incision. Patients enrolled underwent laparoscopic cholecystectomy. Gallbladder extraction was attempted. If standard measures failed, the device was implemented. Extraction time and device utility scores were recorded for each patient. Patients returned 3 - 4 weeks post-operatively for assessment of pain level, cosmetic effect, and presence of infectious complications. Results Twenty (51%) of 39 patients required the device. Average extraction time for the first 8 patients was 120 seconds. After interim analysis, an improved device was used in twelve patients, and average extraction time was 24 seconds. There were no adverse events. Post-operative pain ratings and incision cosmesis were comparable between patients with and without use of the device. Conclusion The study device enables safe and rapid extraction of impacted gallbladders through the abdominal wall. PMID:23897085

  7. Degradation and Reinforcement of Industrial Gas Tank Support Structures. Thirty-Year Long Monitoring

    NASA Astrophysics Data System (ADS)

    Krentowski, Janusz R.; Knyziak, Piotr

    2017-10-01

    An analysis of reinforced concrete supporting structures of more than a dozen liquid gas tanks mounted on tower support structures located at different sites on Poland’s territory is presented. Stability testing of the degraded structures was carried out over a period of 30 years and pointed out significant defects that prevented safe operation of the tanks containing hazardous medium. Analysing complex stress states, as well as displacements of shell structure components, the authors developed a concept of strengthening the structures. Initial repair works, which had been carried out without proper supervision, failed to meet the mandatory requirements and were not compatible with the original design solutions. After several years of operation of the reinforced structures, their degradation states were assessed again. The next stage of repair works was carried out under the supervision of the authors together with authorized representatives of the investors.

  8. Apollo 16 Mission Anomaly Report No. 1: Oxidizer Deservicing Tank Failure

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The command module reaction control system is emptied of all remaining propellant using ground support equipment designed to provide an acid/base neutralization of the propellant in both the liquid and gaseous phases so that it may be disposed of safely. During the deactivation operation of the oxidizer from the Apollo 16 command module on 7 May 1972, the scrubber tank of the decontamination unit exploded, destroying the ground support equipment unit and damaging the building that housed the operation. Only minor injuries were received by the personnel in the area and the command module was not damaged. Test results show that the failure was caused by an insufficient quantity of neutralizer for the quantity of oxidizer. This insufficiency lead to exothermic nitration-type reactions which produced large quantities of gas at a very high rate and failed the decontamination tank.

  9. 77 FR 61027 - Notice of Lodging of Proposed Consent Decree Under the Clean Water Act and Safe Drinking Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Decree resolves alleged violations of the Clean Water Act and Safe Drinking Water Act at mobile home... provide drinking water at a number of its mobile home parks and illegally discharged sewage, failed to... environmental audits at each mobile home park, implementing corrective measures, conducting regular inspections...

  10. Songbird - AN Innovative Uas Combining the Advantages of Fixed Wing and Multi Rotor Uas

    NASA Astrophysics Data System (ADS)

    Thamm, F.-P.; Brieger, N.; Neitzke, K.-P.; Meyer, M.; Jansen, R.; Mönninghof, M.

    2015-08-01

    This paper describes a family of innovative fixed wing UAS with can vertical take off and land - the SONGBIRD family. With nominal payloads starting from 0.5 kg they can take off and land safely like a multi-rotor UAV, removing the need for an airstrip for the critical phases of operation. A specially designed flight controller allows stable flight at every point of the transition phase between VTOL and fixed wing mode. Because of this smooth process with a all time stable flight, very expensive payload like hyperspectral sensors or advanced optical cameras can be used. Due to their design all airplanes of the SONGBIRD family have excellent horizontal flight properties, a maximum speed of over 110 km/h, good gliding properties and long flight times of up to 1 h. Missions were flown in wind speeds up to 18 m/s. At every time of the flight it is possible to interrupt the mission and hover over a point of interest for detail investigations. The complete flight, including take-off and landing can be performed by autopilot. Designed for daily use in professional environments, SONGBIRDs are built out of glass-fibre and carbon composites for a long service life. For safe operations comprehensive security features are implemented, for example redundant flight controllers and sensors, advanced power management system and mature fail safe procedures. The aircraft can be dismantled into small parts for transportation. SONGBIRDS are available for different pay loads, from 500 g to 2 kg. The SONGBIRD family are interesting tools combining the advantages of multi-copter and fixed wing UAS.

  11. The case for fire safe cigarettes made through industry documents

    PubMed Central

    Gunja, M; Wayne, G; Landman, A; Connolly, G; McGuire, A

    2002-01-01

    Objectives: To examine the extensive research undertaken by the tobacco industry over the past 25 years toward development of a fire safe cigarette. Methods: Research was conducted through a web based search of internal tobacco industry documents made publicly available through the 1998 Master Settlement Agreement. Results: The documents reveal that the tobacco industry produced a fire safe cigarette years ago, but failed to put it on the market. These findings contradict public industry claims that denied the technical feasibility and commercial acceptability of fire safe cigarettes. Internal documents also reveal a decades long, coordinated political strategy used to block proposed legislation and obfuscate the fire safe issue. Conclusions: Federal legislation mandating fire safe cigarettes is needed. PMID:12432160

  12. 24 CFR 761.23 - Grantee performance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Operation Safe Home, Operation Weed and Seed, and the Safe Neighborhoods Action Program operating in the... emanating from other anti-crime and anti-drug programs, such as Operation Safe Home, Operation Weed and Seed...

  13. 24 CFR 761.23 - Grantee performance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Operation Safe Home, Operation Weed and Seed, and the Safe Neighborhoods Action Program operating in the... emanating from other anti-crime and anti-drug programs, such as Operation Safe Home, Operation Weed and Seed...

  14. 24 CFR 761.23 - Grantee performance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Operation Safe Home, Operation Weed and Seed, and the Safe Neighborhoods Action Program operating in the... emanating from other anti-crime and anti-drug programs, such as Operation Safe Home, Operation Weed and Seed...

  15. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The orbiter Discovery rolls along the tow-way to the Vehicle Assembly Building where it will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  16. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The orbiter Discovery sits inside the Vehicle Assembly Building (VAB) after its rollover from the Orbiter Processing Facility (OPF) bay rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  17. Hubble (HST) hardware is inspected in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103, is given a black light inspection. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a 'call-up' due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  18. KSC-99padig024

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- Orbiter Discovery begins rolling into the Vehicle Assembly Building for stacking with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  19. KSC-99padig020

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- Orbiter Discovery begins its rollover to the Vehicle Assembly Building (in the background) after leaving the Orbiter Processing Facility bay 1. Launch date for Discovery on mission STS-103, the third Hubble Space Telescope servicing mission, is under review for early December. The mission is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  20. KSC-99pp1279

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery rolls along the tow-way to the Vehicle Assembly Building where it will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  1. KSC-99pp1078

    NASA Image and Video Library

    1999-08-25

    In the Payload Hazardous Servicing Facility, a worker gives a black light inspection to part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a "call-up" due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  2. KSC-99pp1280

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery rolls along the tow-way to the Vehicle Assembly Building where it will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  3. KSC-99pp1079

    NASA Image and Video Library

    1999-08-25

    In the Payload Hazardous Servicing Facility, part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103, is given a black light inspection. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a "call-up" due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  4. KSC-99padig021

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- Orbiter Discovery is moved from the Orbiter Processing Facility bay 1 (at left) to the Vehicle Assembly Building for mating with an external tank and solid rocket boosters. Launch date for Discovery on mission STS-103, the third Hubble Space Telescope servicing mission, is under review for early December. The mission is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  5. Clinical impacts of oral gastrografin follow-through in adhesive small bowel obstruction (SBO).

    PubMed

    Farid, Mohammed; Fikry, Amir; El Nakeeb, Ayman; Fouda, Elyamani; Elmetwally, Tito; Yousef, Mohammed; Omar, Waleed

    2010-08-01

    Many studies have shown that gastrografin can be used for diagnosis of adhesive small bowel obstruction (ASBO) and for assessing the need for surgical intervention. However, several studies have reported conflicting results. Therefore, the aim of this study is to assess the diagnostic and therapeutic effect of gastrografin in ASBO. Altogether, 110 patients with ASBO were randomized into control and gastrografin groups. In the gastrografin group, 100 mL of the dye was administered through a nasogastric tube. Obstruction was considered complete if the contrast failed to reach the colon on the 24-h film. Patients with gastrografin in the colon within 24 h after dye administration were considered as partially obstructed, and were submitted to nonoperative treatment. The patients were operated on if they developed signs of strangulation or failed to improve within 48 h. The overall operative rate was 14.5% in gastrografin group versus 34.5% in control group, P=0.04. The time from admission to resolution of symptoms was significantly lower in gastrografin group (19.5 versus 42.6 h, P=0.001), and the length of hospital stay was shorter in gastrografin group (3.8 versus 6.9 d 0.002), and in nonoperative patients (3.1 versus 5.1 days). Sensitivity, specificity, positive predictive value, and negative predictive value for gastrografin follow-through as an indicator for operative treatment of ASBO were 87.5%, 100%, 100 % , and 97.9%, respectively. Oral gastrografin helps in the management of ASBO. Oral gastrografin is safe and reduces the operative rate and time of resolution as well as hospital stay. Copyright 2010 Elsevier Inc. All rights reserved.

  6. Value of gastrografin in adhesive small bowel obstruction after unsuccessful conservative treatment: a prospective evaluation.

    PubMed

    Choi, Hok-Kwok; Law, Wai-Lun; Ho, Judy-Wai-Chu; Chu, Kin-Wah

    2005-06-28

    Gastrografin is a hyperosmolar water-soluble contrast medium. Besides its predictive value for the need for operative treatment, a potential therapeutic role of this agent in adhesive small bowel obstruction has been suggested. This study aimed at evaluating the effectiveness of gastrografin in adhesive small bowel obstruction when conservative treatment failed. Patients with adhesive small bowel obstruction were given trial conservative treatment unless there was fear of bowel strangulation. Those responded in the initial 48 h had conservative treatment continued. Patients who showed no improvement in the initial 48 h were given 100 mL of gastrografin through nasogastric tube followed by serial abdominal radiographs. Patients with the contrast appeared in large bowel within 24 h were regarded as having partial obstruction and conservative treatment was continued. Patients in which the contrast failed to reach large bowel within 24 h were considered to have complete obstruction and laparotomy was performed. Two hundred and twelve patients with 245 episodes of adhesive obstruction were included. Fifteen patients were operated on soon after admission due to fear of strangulation. One hundred and eighty-six episodes of obstruction showed improvement in the initial 48 h and conservative treatment was continued. Two patients had subsequent operations because of persistent obstruction. Forty-four episodes of obstruction showed no improvement within 48 h and gastrografin was administered. Seven patients underwent complete obstruction surgery. Partial obstruction was demonstrated in 37 other cases, obstruction resolved subsequently in all of them except one patient who required laparotomy because of persistent obstruction. The overall operative rate in this study was 10%. There was no complication that could be attributed to the use of gastrografin. The use of gastrografin in adhesive small bowel obstruction after unsuccessful conservative treatment is safe and reduces the need for surgical intervention.

  7. Digital computer operation of a nuclear reactor

    DOEpatents

    Colley, R.W.

    1982-06-29

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

  8. Digital computer operation of a nuclear reactor

    DOEpatents

    Colley, Robert W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

  9. The Alpha-Proton-X-ray Spectrometer deployment mechanism: an anthropomorphic approach to sensor placement on Martian rocks and soil

    NASA Astrophysics Data System (ADS)

    Blomquist, Richard S.

    1995-05-01

    On July 4,1997, the Mars Pathfinder spacecraft lands on Mars and starts conducting technological and scientific experiments. One experiment, the Alpha-Proton-X-ray Spectrometer, uses a sensor head placed against rocks and soil to determine their composition. To guarantee proper placement, a deployment mechanism mounted on the Mars Rover aligns the sensor head to within 20 deg of the rock and soil surfaces. In carrying out its task, the mechanism mimics the action of a human hand and arm. Consisting of a flexible wrist, a parallel link arm, a brush dc motor actuator, and a revolutionary non-pyrotechnic fail-safe release device, the mechanism correctly positions the sensor head on rocks as high as 0.29 m and on targets whose surfaces are tilted as much as 45 deg from the nominal orientation of the sensor head face. The mechanism weighs less than 0.5 kg, can withstand 100 g's, and requires less than 2.8 N x m of actuation torque. The fail-safe coupler utilizes Cerrobend, a metal alloy that melts at 60 C, to fuse the actuator and the rest of the mechanism together. A film heater wrapped around the coupler melts the metal, and Negator springs drive the mechanism into its stowed position. The fail-safe actuates using 6.75 Watts for 5 minutes in the event of an actuator failure.

  10. The Alpha-Proton-X-ray Spectrometer deployment mechanism: An anthropomorphic approach to sensor placement on Martian rocks and soil

    NASA Technical Reports Server (NTRS)

    Blomquist, Richard S.

    1995-01-01

    On July 4,1997, the Mars Pathfinder spacecraft lands on Mars and starts conducting technological and scientific experiments. One experiment, the Alpha-Proton-X-ray Spectrometer, uses a sensor head placed against rocks and soil to determine their composition. To guarantee proper placement, a deployment mechanism mounted on the Mars Rover aligns the sensor head to within 20 deg of the rock and soil surfaces. In carrying out its task, the mechanism mimics the action of a human hand and arm. Consisting of a flexible wrist, a parallel link arm, a brush dc motor actuator, and a revolutionary non-pyrotechnic fail-safe release device, the mechanism correctly positions the sensor head on rocks as high as 0.29 m and on targets whose surfaces are tilted as much as 45 deg from the nominal orientation of the sensor head face. The mechanism weighs less than 0.5 kg, can withstand 100 g's, and requires less than 2.8 N x m of actuation torque. The fail-safe coupler utilizes Cerrobend, a metal alloy that melts at 60 C, to fuse the actuator and the rest of the mechanism together. A film heater wrapped around the coupler melts the metal, and Negator springs drive the mechanism into its stowed position. The fail-safe actuates using 6.75 Watts for 5 minutes in the event of an actuator failure.

  11. Fail-safe mechanism of GCN4 translational control—uORF2 promotes reinitiation by analogous mechanism to uORF1 and thus secures its key role in GCN4 expression

    PubMed Central

    Gunišová, Stanislava; Valášek, Leoš Shivaya

    2014-01-01

    One of the extensively studied mechanisms of gene-specific translational regulation is reinitiation. It takes place on messenger RNAs (mRNAs) where main ORF is preceded by upstream ORF (uORF). Even though uORFs generally down-regulate main ORF expression, specific uORFs exist that allow high level of downstream ORF expression. The key is their ability to retain 40S subunits on mRNA upon termination of their translation to resume scanning for the next AUG. Here, we took advantage of the exemplary model system of reinitiation, the mRNA of yeast transcriptional activator GCN4 containing four short uORFs, and show that contrary to previous reports, not only the first but the first two of its uORFs allow efficient reinitiation. Strikingly, we demonstrate that they utilize a similar molecular mechanism relying on several cis-acting 5′ reinitiation-promoting elements, one of which they share, and the interaction with the a/TIF32 subunit of translation initiation factor eIF3. Since a similar mechanism operates also on YAP1 uORF, our findings strongly suggest that basic principles of reinitiation are conserved. Furthermore, presence of two consecutive reinitiation-permissive uORFs followed by two reinitiation-non-permissive uORFs suggests that tightness of GCN4 translational control is ensured by a fail-safe mechanism that effectively prevents or triggers GCN4 expression under nutrient replete or deplete conditions, respectively. PMID:24623812

  12. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In this aerial view, the tail of the orbiter Discovery can be seen as it begins rolling out of the Orbiter Processing Facility (OPF) bay 1 (center left of photo). Behind it is the tow-way, which leads from the Shuttle Landing Facility past the OPF. In the foreground is the new road under construction as part of the Safe Haven project. And at right is the one of two crawlers used to move the Shuttles to the launch pad. Discovery is moving to the Vehicle Assembly Building for stacking with an external tank and solid rocket boosters before its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  13. 49 CFR 192.1009 - What must an operator report when a mechanical fitting fails?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false What must an operator report when a mechanical fitting fails? 192.1009 Section 192.1009 Transportation Other Regulations Relating to Transportation... fitting fails? (a) Except as provided in paragraph (b) of this section, each operator of a distribution...

  14. 49 CFR 192.1009 - What must an operator report when a mechanical fitting fails?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false What must an operator report when a mechanical fitting fails? 192.1009 Section 192.1009 Transportation Other Regulations Relating to Transportation... fitting fails? (a) Except as provided in paragraph (b) of this section, each operator of a distribution...

  15. 49 CFR 192.1009 - What must an operator report when a mechanical fitting fails?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false What must an operator report when a mechanical fitting fails? 192.1009 Section 192.1009 Transportation Other Regulations Relating to Transportation... fitting fails? (a) Except as provided in paragraph (b) of this section, each operator of a distribution...

  16. 49 CFR 192.1009 - What must an operator report when a mechanical fitting fails?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false What must an operator report when a mechanical fitting fails? 192.1009 Section 192.1009 Transportation Other Regulations Relating to Transportation... fitting fails? (a) Except as provided in paragraph (b) of this section, each operator of a distribution...

  17. Reconstruction of the gastric passage by a side-to-side gastrogastrostomy after failed vertical-banded gastroplasty: a case report

    PubMed Central

    Soll, Christopher; Müller, Markus K; Wildi, Stefan; Clavien, Pierre-Alain; Weber, Markus

    2008-01-01

    Introduction Vertical-banded gastroplasty, a technique that is commonly performed in the treatment of morbid obesity, represents a nonadjustable restrictive procedure which reduces the volume of the upper stomach by a vertical stapler line. In addition, a textile or silicone band restricts food passage through the stomach. Case presentation A 71-year-old woman presented with a severe gastric stenosis 11 years after vertical gastroplasty. We describe a side-to-side gastrogastrostomy as a safe surgical procedure to restore the physiological gastric passage after failed vertical-banded gastroplasty. Conclusion Occasionally, restrictive procedures for morbid obesity cannot be converted into an alternative bariatric procedure to maintain weight control. This report demonstrates that a side-to-side gastrogastrostomy is a feasible and safe procedure. PMID:18513454

  18. Superfluid Helium Tanker (SFHT) study

    NASA Technical Reports Server (NTRS)

    Eberhardt, Ralph N.; Dominick, Sam M.; Anderson, John E.; Gille, John P.; Martin, Tim A.; Marino, John S.; Paynter, Howard L.; Traill, R. Eric; Herzl, Alfred; Gotlib, Sam

    1988-01-01

    Replenishment of superfluid helium (SFHe) offers the potential of extending the on-orbit life of observatories, satellite instruments, sensors and laboratories which operate in the 2 K temperature regime. A reference set of resupply customers was identified as representing realistic helium servicing requirements and interfaces for the first 10 years of superfluid helium tanker (SFHT) operations. These included the Space Infrared Telescope Facility (SIRTF), the Advanced X-ray Astrophysics Facility (AXAF), the Particle Astrophysics Magnet Facility (Astromag), and the Microgravity and Materials Processing Sciences Facility (MMPS)/Critical Point Phenomena Facility (CPPF). A mixed-fleet approach to SFHT utilization was considered. The tanker permits servicing from the Shuttle cargo bay, in situ when attached to the OMV and carried to the user spacecraft, and as a depot at the Space Station. A SFHT Dewar ground servicing concept was developed which uses a dedicated ground cooling heat exchanger to convert all the liquid, after initial fill as normal fluid, to superfluid for launch. This concept permits the tanker to be filled to a near full condition, and then cooled without any loss of fluid. The final load condition can be saturated superfluid with any desired ullage volume, or the tank can be totally filed and pressurized. The SFHT Dewar and helium plumbing system design has sufficient component redundancy to meet fail-operational, fail-safe requirements, and is designed structurally to meet a 50 mission life usage requirement. Technology development recommendations were made for the selected SFHT concept, and a Program Plan and cost estimate prepared for a phase C/D program spanning 72 months from initiation through first launch in 1997.

  19. A fully integrated new paradigm for lithium’s mode of action – lithium utilizes latent cellular fail-safe mechanisms

    PubMed Central

    van Woerkom, Arthur Ernst

    2017-01-01

    It is proposed that lithium’s therapeutic effects occur indirectly by augmenting a cascade of protective “fail-safe” pathways pre-configured to activate in response to a dangerous low cell [Mg++] situation, eg, posttraumatic brain injury, alongside relative cell adenosine triphosphate depletion. Lithium activates cell protection, as it neatly mimics a lowered intracellular [Mg++] level. PMID:28203080

  20. SafeNet: a methodology for integrating general-purpose unsafe devices in safe-robot rehabilitation systems.

    PubMed

    Vicentini, Federico; Pedrocchi, Nicola; Malosio, Matteo; Molinari Tosatti, Lorenzo

    2014-09-01

    Robot-assisted neurorehabilitation often involves networked systems of sensors ("sensory rooms") and powerful devices in physical interaction with weak users. Safety is unquestionably a primary concern. Some lightweight robot platforms and devices designed on purpose include safety properties using redundant sensors or intrinsic safety design (e.g. compliance and backdrivability, limited exchange of energy). Nonetheless, the entire "sensory room" shall be required to be fail-safe and safely monitored as a system at large. Yet, sensor capabilities and control algorithms used in functional therapies require, in general, frequent updates or re-configurations, making a safety-grade release of such devices hardly sustainable in cost-effectiveness and development time. As such, promising integrated platforms for human-in-the-loop therapies could not find clinical application and manufacturing support because of lacking in the maintenance of global fail-safe properties. Under the general context of cross-machinery safety standards, the paper presents a methodology called SafeNet for helping in extending the safety rate of Human Robot Interaction (HRI) systems using unsafe components, including sensors and controllers. SafeNet considers, in fact, the robotic system as a device at large and applies the principles of functional safety (as in ISO 13489-1) through a set of architectural procedures and implementation rules. The enabled capability of monitoring a network of unsafe devices through redundant computational nodes, allows the usage of any custom sensors and algorithms, usually planned and assembled at therapy planning-time rather than at platform design-time. A case study is presented with an actual implementation of the proposed methodology. A specific architectural solution is applied to an example of robot-assisted upper-limb rehabilitation with online motion tracking. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  1. Surface Movement Incidents Reported to the NASA Aviation Safety Reporting System

    NASA Technical Reports Server (NTRS)

    Connell, Linda J.; Hubener, Simone

    1997-01-01

    Increasing numbers of aircraft are operating on the surface of airports throughout the world. Airport operations are forecast to grow by more that 50%, by the year 2005. Airport surface movement traffic would therefore be expected to become increasingly congested. Safety of these surface operations will become a focus as airport capacity planning efforts proceed toward the future. Several past events highlight the prevailing risks experienced while moving aircraft during ground operations on runways, taxiways, and other areas at terminal, gates, and ramps. The 1994 St. Louis accident between a taxiing Cessna crossing an active runway and colliding with a landing MD-80 emphasizes the importance of a fail-safe system for airport operations. The following study explores reports of incidents occurring on an airport surface that did not escalate to an accident event. The Aviation Safety Reporting System has collected data on surface movement incidents since 1976. This study sampled the reporting data from June, 1993 through June, 1994. The coding of the data was accomplished in several categories. The categories include location of airport, phase of ground operation, weather /lighting conditions, ground conflicts, flight crew characteristics, human factor considerations, and airport environment. These comparisons and distributions of variables contributing to surface movement incidents can be invaluable to future airport planning, accident prevention efforts, and system-wide improvements.

  2. Evaluation of a protocol for the non-operative management of perforated peptic ulcer.

    PubMed

    Marshall, C; Ramaswamy, P; Bergin, F G; Rosenberg, I L; Leaper, D J

    1999-01-01

    The non-operative management of perforated peptic ulcer has previously been shown to be both safe and effective although it remains controversial. A protocol for non-operative management was set up in this hospital in 1989. Adherence to the guidelines in the protocol has been audited over a 6-year period with a review of outcome. The case-notes of patients with a diagnosis of perforated peptic ulcer were reviewed. Twelve guidelines from the protocol were selected for evaluation of compliance to the protocol. Forty-nine patients underwent non-operative treatment initially. Eight patients failed to respond and underwent operation. Complications included abscess formation (seven patients), renal failure (one), gastric ileus (one), chest infection (two), and cardiac failure and stroke (one). Four deaths occurred in this group. Adherence to certain protocol guidelines was poor, notably those concerning prevention of thromboembolism, use of antibiotics, use of contrast examination to confirm the diagnosis and referral for follow-up endoscopy. Two gastric cancers were detected on subsequent endoscopy. This experience demonstrates that non-operative treatment can be used successfully in a general hospital. Adherence to protocol guidelines was found to be variable and the protocol has therefore been simplified. This study highlights the need for an accurate diagnosis and the importance of follow-up endoscopy.

  3. Fail-safe numerical control

    NASA Technical Reports Server (NTRS)

    Thompson, G. A.

    1970-01-01

    System provides duplicate set of control logic circuitry. Comparators insure that the same data is present in both circuits. If any discrepancy is found, the machine is automatically stopped, before damage can occur.

  4. An Unusual Complication With the Administration of a Volatile Anesthetic Agent for Status Asthmaticus in the Pediatric Intensive Care Unit: Case Report and Review of the Literature.

    PubMed

    Shutes, Brittany; Frazier, W Joshua; Tobias, Joseph D

    2017-07-01

    In severe cases of status asthmaticus, when conventional therapies fail, volatile anesthetic agents remain a therapeutic option. When delivered outside of the operating room setting, specialized delivery techniques are needed to ensure the safe and effective use of volatile anesthetic agents. We present a 16-year-old adolescent with status asthmaticus who required the therapeutic administration of the volatile anesthetic agent, sevoflurane, in the pediatric intensive care unit (PICU). Although initially effective in reducing bronchospasm, progressive hypercarbia developed due to defective functioning of the carbon dioxide absorber of the anesthesia machine. This failure occurred as the soda lime compartment filled with water accumulated from circuit humidification and continuous albuterol therapy. The role of volatile anesthetic agents in the treatment of status asthmaticus in the PICU is discussed, options for delivery outside of the operating room presented, and potential problems with delivery reviewed.

  5. Advanced design for lightweight structures: Review and prospects

    NASA Astrophysics Data System (ADS)

    Braga, Daniel F. O.; Tavares, S. M. O.; da Silva, Lucas F. M.; Moreira, P. M. G. P.; de Castro, Paulo M. S. T.

    2014-08-01

    Current demand for fuel efficient aircraft has been pushing the aeronautical sector to develop ever more lightweight designs while keeping safe operation and required structural strength. Along with light-weighting, new structural design concepts have also been established in order to maintain the aircraft in service for longer periods of time, with high reliability levels. All these innovations and requirements have led to deeply optimized aeronautical structures contributing to more sustainable air transport. This article reviews the major design philosophies which have been employed in aircraft structures, including safe-life, fail-safe and damage tolerance taking into account their impact on the structural design. A brief historical review is performed in order to analyse what led to the development of each philosophy. Material properties are related to each of the design philosophies. Damage tolerant design has emerged as the main structural design philosophy in aeronautics, requiring deep knowledge on materials fatigue and corrosion strength, as well as potential failure modes and non-destructive inspection techniques, particularly minimum detectable defect and scan times. A discussion on the implementation of structural health monitoring and self-healing structures within the current panorama of structures designed according to the damage tolerant philosophy is presented. This discussion is aided by a review of research on these two subjects. These two concepts show potential for further improving safety and durability of aircraft structures.

  6. Scalable and fail-safe deployment of the ATLAS Distributed Data Management system Rucio

    NASA Astrophysics Data System (ADS)

    Lassnig, M.; Vigne, R.; Beermann, T.; Barisits, M.; Garonne, V.; Serfon, C.

    2015-12-01

    This contribution details the deployment of Rucio, the ATLAS Distributed Data Management system. The main complication is that Rucio interacts with a wide variety of external services, and connects globally distributed data centres under different technological and administrative control, at an unprecedented data volume. It is therefore not possible to create a duplicate instance of Rucio for testing or integration. Every software upgrade or configuration change is thus potentially disruptive and requires fail-safe software and automatic error recovery. Rucio uses a three-layer scaling and mitigation strategy based on quasi-realtime monitoring. This strategy mainly employs independent stateless services, automatic failover, and service migration. The technologies used for deployment and mitigation include OpenStack, Puppet, Graphite, HAProxy and Apache. In this contribution, the interplay between these components, their deployment, software mitigation, and the monitoring strategy are discussed.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bai, Xian-Xu, E-mail: bai@hfut.edu.cn; Wereley, Norman M.

    Magnetorheological (MR) energy absorbers (EAs) are an effective adaptive EA technology with which to maximize shock and vibration isolation. However, to realize maximum performance of the semi-active control system, the off-state (i.e., field off) stroking load of the MREA must be minimized at all speeds, and the dynamic range of the MREA must be maximized at high speed. This study presents a fail-safe MREA (MREA-FS) concept that, can produce a greater dynamic range at all piston speeds. A bias damping force is generated in the MREA-FS using permanent magnetic fields, which enables fail-safe behavior in the case of power failure.more » To investigate the feasibility and capability of the MREA-FS in the context of the semi-active control systems, a single-degree-of-freedom base excited rigid payload is mathematically constructed and simulated with skyhook control.« less

  8. Time-saving and fail-safe dissection method for vestibulocochlear organs in gross anatomy classes.

    PubMed

    Suzuki, Ryoji; Konno, Naoaki; Ishizawa, Akimitsu; Kanatsu, Yoshinori; Funakoshi, Kodai; Akashi, Hideo; Zhou, Ming; Abe, Hiroshi

    2017-09-01

    Because the vestibulocochlear organs are tiny and complex, and are covered by the petrous part of the temporal bone, they are very difficult for medical students to dissect and visualize during gross anatomy classes. Here, we report a time-saving and fail-safe procedure we have devised, using a hand-held hobby router. Nine en bloc temporal bone samples from donated human cadavers were used as trial materials for devising an appropriate procedure for dissecting the vestibulocochlear organs. A hand-held hobby router was used to cut through the temporal bone. After trials, the most time-saving and fail-safe method was selected. The performance of the selected method was assessed by a survey of 242 sides of 121 cadavers during gross anatomy classes for vestibulocochlear dissection. The assessment was based on the observation ratio. The best procedure appeared to be removal of the external acoustic meatus roof and tympanic cavity roof together with removal of the internal acoustic meatus roof. The whole procedure was completed within two dissection classes, each lasting 4.5 hr. The ratio of surveillance for the chorda tympani and three semicircular canals by students was significantly improved during 2013 through 2016. In our dissection class, "removal of the external acoustic meatus roof and tympanic cavity roof together with removal of the internal acoustic meatus roof" was the best procedure for students in the limited time available. Clin. Anat. 30:703-710, 2017. © 2017Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  9. Endoscopic electrosurgical papillotomy and manometry in biliary tract disease.

    PubMed

    Geenen, J E; Hogan, W J; Shaffer, R D; Stewart, E T; Dodds, W J; Arndorfer, R C

    1977-05-09

    Endoscopic papillotomy was performed in 13 patients after cholecystectomy for retained or recurrent common bile duct calculi (11 patients) and a clinical picture suggesting papillary stenosis (two patients). Following endoscopic papillotomy, ten of the 11 patients spontaneously passed common bile duct (CBD) stones verified on repeated endoscopic retrograde cholangiopancreatography (ERCP) study. One patient failed to pass a large CBD calculus; one patient experienced cholangitis three months after in inadequate papillotomy and required operative intervention. Endoscopic papillotomy substantially decreased the pressure gradient existing between the CBD and the duodenum in all five patients studied with ERCP manometry. Endoscopic papillotomy is a relatively safe and effective procedure for postcholecystectomy patients with retained or recurrent CBD stones. The majority of CBD stones will pass spontaneously if the papillotomy is adequate.

  10. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In this aerial view, the orbiter Discovery is out of the Orbiter Processing Facility (OPF) bay 1 and rolling back before onto the tow-way for its rollover to the Vehicle Assembly Building where it will be mated with an external tank and solid rocket boosters before its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  11. KSC-99pp1288

    NASA Image and Video Library

    1999-11-05

    KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39B, the payload canister for Space Shuttle Discovery, for mission STS-103, is lifted up the Rotating Service Structure. The hoses attached to the canister provide airconditioning until the canister is mated to the environmentally controlled Payload Changeout Room and the payload bay doors are open. Installation of the payload into Discovery is slated for Friday, Nov. 12. The mission is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  12. KSC-99pp1281

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery sits inside the Vehicle Assembly Building (VAB) after its rollover from the Orbiter Processing Facility (OPF) bay 1. In the VAB, Discovery will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  13. KSC-99pp1048

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a worker begins to open the protective covering over a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  14. KSC-99pp1049

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), workers remove the protective covering from a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  15. KSC-99padig023

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- Orbiter Discovery is rolled over to the Vehicle Assembly Building from the Orbiter Processing Facility bay 1. In the VAB it will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  16. KSC-99pp1277

    NASA Image and Video Library

    1999-11-04

    In this aerial view, the orbiter Discovery is out of the Orbiter Processing Facility (OPF) bay 1 and rolling back before onto the tow-way for its rollover to the Vehicle Assembly Building where it will be mated with an external tank and solid rocket boosters before its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  17. KSC-99pp1289

    NASA Image and Video Library

    1999-11-05

    KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39B, the open doors of the payload canister, inside the environmentally controlled Payload Changeout Room, reveal the Hubble Servicing Mission cargo. At the top is the Orbital Replacement Unit Carrier and at the bottom is the Flight Support System. Installation of the payload into Discovery is slated for Friday, Nov. 12. The mission is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  18. 33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What must a ship master do if... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...

  19. A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

    NASA Technical Reports Server (NTRS)

    Putcha, Chandra S.; Mikula, D. F. Kip; Dueease, Robert A.; Dang, Lan; Peercy, Robert L.

    1997-01-01

    This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

  20. Short- and long-term results of transcatheter embolization for massive arterial hemorrhage from gastroduodenal ulcers not controlled by endoscopic hemostasis

    PubMed Central

    Loffroy, Romaric; Guiu, Boris; Mezzetta, Lise; Minello, Anne; Michiels, Christophe; Jouve, Jean-Louis; Cheynel, Nicolas; Rat, Patrick; Cercueil, Jean-Pierre; Krausé, Denis

    2009-01-01

    BACKGROUND AND AIM: Severe bleeding from gastrointestinal ulcers is a life-threatening event that is difficult to manage when endoscopic treatment fails. Transcatheter embolization has been suggested as an alternative treatment in this situation. The present study reports on the efficacy and long-term outcomes of transcatheter embolization after failed endoscopic treatments were assessed in high-operative-risk patients. METHODS: A retrospective review of 60 consecutive emergency embolization procedures in hemodynamically unstable patients (41 men, 19 women; mean [±SD] age 69.4±15 years) was conducted. Patients were referred for selective angiography between 1999 and 2008 after failed endoscopic treatment of massive bleeding from gastrointestinal ulcers. Mean follow-up was 22 months. RESULTS: Embolization was feasible and successful in 57 patients. Sandwich coiling of the gastroduodenal artery was used in 34 patients, and superselective occlusion of the terminal feeding artery (with glue, coils or gelatin particles) was used in 23 patients. Early rebleeding occurred in 16 patients and was managed with endoscopy (n=8), reembolization (n=3) or surgery (n=5). No major embolization-related complications occurred. Sixteen patients died within 30 days after embolization (including three who died from rebleeding) and 11 died thereafter. No late bleeding recurrences were reported. CONCLUSIONS: Selective angiographic embolization is safe and effective for controlling life-threatening bleeding from gastroduodenal ulcers. The procedure usually obviates the need for emergency surgery in these high-risk patients. Survival depends chiefly on underlying conditions. PMID:19214287

  1. Reliability analysis applied to structural tests

    NASA Technical Reports Server (NTRS)

    Diamond, P.; Payne, A. O.

    1972-01-01

    The application of reliability theory to predict, from structural fatigue test data, the risk of failure of a structure under service conditions because its load-carrying capability is progressively reduced by the extension of a fatigue crack, is considered. The procedure is applicable to both safe-life and fail-safe structures and, for a prescribed safety level, it will enable an inspection procedure to be planned or, if inspection is not feasible, it will evaluate the life to replacement. The theory has been further developed to cope with the case of structures with initial cracks, such as can occur in modern high-strength materials which are susceptible to the formation of small flaws during the production process. The method has been applied to a structure of high-strength steel and the results are compared with those obtained by the current life estimation procedures. This has shown that the conventional methods can be unconservative in certain cases, depending on the characteristics of the structure and the design operating conditions. The suitability of the probabilistic approach to the interpretation of the results from full-scale fatigue testing of aircraft structures is discussed and the assumptions involved are examined.

  2. Fail-safe fire detection system

    NASA Technical Reports Server (NTRS)

    Bloam, E. T.

    1974-01-01

    Fire detection control system continually monitors its own integrity, automatically signals any malfunction, and separately signals fire in any zone being monitored. Should be of interest in fields of chemical and petroleum processing, power generation, equipment testing, and building protection.

  3. 29 CFR 1918.86 - Roll-on roll-off (Ro-Ro) operations (see also § 1918.2, Ro-Ro operations, and § 1918.25).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... simultaneous use of the ramp by vehicles and pedestrians. (d) Ramp maintenance. Ramps shall be properly... ramp inclines safely. (j) Safe speeds. Power driven vehicles used in Ro-Ro operations shall be operated at speeds that are safe for prevailing conditions. (k) Ventilation. Internal combustion engine-driven...

  4. Design, Qualification and Lessons Learned of the Shutter Calibration Mechanism for EnMAP Mission

    NASA Astrophysics Data System (ADS)

    Schmidt, Tilo; Muller, Silvio; Bergander, Arvid; Zajac, Kai; Seifart, Klaus

    2015-09-01

    The Shutter Calibration Mechanism (SCM) Assembly is one of three mechanisms which are developed by HTS for the EnMAP instrument in subcontract to OHB System AG Munich. EnMAP is the Environmental Mapping and Analysis Program of the German Space Agency DLR.The binary rotary encoder of the SCM using hall-effect sensors was already presented during ESMATS 2011. This paper summarizes the main functions and design features of the Hardware and focuses on qualification testing which has finished successfully in 2014. Of particular interest is the functional testing of the main drive including the precise hall-effect position sensing system and the test of the fail safe mechanism. In addition to standard test campaign required for QM also a shock emission measurement of the fail safe mechanism activation was conducted.Test conduction and results will be presented with focus on deviations from the expected behaviour, mitigation measures and on lessons learned.

  5. CAT-tailing as a fail-safe mechanism for efficient degradation of stalled nascent polypeptides

    PubMed Central

    Kostova, Kamena K.; Hickey, Kelsey L.; Osuna, Beatriz A.; Hussmann, Jeffrey A.; Frost, Adam; Weinberg, David E.; Weissman, Jonathan S.

    2017-01-01

    Ribosome stalling leads to recruitment of the Ribosome Quality control Complex (RQC), which targets the partially synthesized polypeptide for proteasomal degradation through the action of the ubiquitin ligase Ltn1p. A second core RQC component, Rqc2p, modifies the nascent polypeptide by adding a Carboxy-terminal Alanine and Threonine (CAT) tail through a non-canonical elongation reaction. Here we explore the role of CATtailing in nascent-chain degradation in budding yeast. We show that Ltn1p can efficiently access only nascent chain lysines immediately proximal to the ribosome exit tunnel. For substrates without Ltn1p-accessible lysines, CAT-tailing enables degradation by exposing lysines sequestered in the ribosome exit tunnel. Thus, CAT-tails do not serve as a degron, but rather provide a fail-safe mechanism that expands the range of RQC-degradable substrates. PMID:28751611

  6. Flight test and evaluation of Omega navigation for general aviation

    NASA Technical Reports Server (NTRS)

    Hwoschinsky, P. V.

    1975-01-01

    A seventy hour flight test program was performed to determine the suitability and accuracy of a low cost Omega navigation receiver in a general aviation aircraft. An analysis was made of signal availability in two widely separated geographic areas. Comparison is made of the results of these flights with other navigation systems. Conclusions drawn from the test experience indicate that developmental system improvement is necessary before a competent fail safe or fail soft area navigation system is offered to general aviation.

  7. Automated Testing Experience of the Linear Aerospike SR-71 Experiment (LASRE) Controller

    NASA Technical Reports Server (NTRS)

    Larson, Richard R.

    1999-01-01

    System controllers must be fail-safe, low cost, flexible to software changes, able to output health and status words, and permit rapid retest qualification. The system controller designed and tested for the aerospike engine program was an attempt to meet these requirements. This paper describes (1) the aerospike controller design, (2) the automated simulation testing techniques, and (3) the real time monitoring data visualization structure. Controller cost was minimized by design of a single-string system that used an off-the-shelf 486 central processing unit (CPU). A linked-list architecture, with states (nodes) defined in a user-friendly state table, accomplished software changes to the controller. Proven to be fail-safe, this system reported the abort cause and automatically reverted to a safe condition for any first failure. A real time simulation and test system automated the software checkout and retest requirements. A program requirement to decode all abort causes in real time during all ground and flight tests assured the safety of flight decisions and the proper execution of mission rules. The design also included health and status words, and provided a real time analysis interpretation for all health and status data.

  8. Intra-operative device closure of perimembranous ventricular septal defect without cardiopulmonary bypass under guidance of trans-epicardial echocardiography: a single center experience.

    PubMed

    Sun, Yong; Zhu, Peng; Zhou, Pengyu; Guo, Yilong; Zheng, Shao-Yi

    2016-05-27

    Intraoperative device closure of perimembranous ventricular septal defect(VSD) through a lower mini-sternotomy is safe, less invasive, and has excellent surgical and cosmetic outcomes. Our study is to evaluate the feasibility of closing VSD under guidance of trans-epicardial echocardiography. We reviewed the clinical course of 41 patients referred to our institution for minimally invasive closure of perimembranous VSD. The trans-epicardial echocardiography(TEE) was used to monitor the whole procedure to guide the positioning of device and evaluate the operative effect instantly after operation. The procedure was successfully done in 38 patients(92.6 %) with mean age of 1.2 ± 1.5 years(range 0.5-6.1 years),mean weight of 10.78 ± 6.87 kg(range 5.2 ~ 26 kg) and VSD size of 5.1 ± 1.13 mm(range 5 ~ 10 mm). Three cases failed, including two cases whose guide-wires could not pass through VSDs and one case whose occluder could not repair VSD well. Three patients had tiny residual shunts because of the shifting of occluders. There were no major complications such as arrhythmia, valve regurgitation and the failure of occluder during follow-up(Mean 2.3 ± 1.2 years). TEE provided superior imaging of shapes and surrounding structures of the VSDs, and guide-wires passing through VSDs. Intraoperative device closure of perimembranous VSD through a lower mini-sternotomy without cardiopulmonary bypass appears to be a safe and effective procedure. The use of trans-epicardial echocardiography provides useful information for intraoperative device closure of VSD.

  9. Collapsable seal member

    DOEpatents

    Sherrell, Dennis L.

    1990-01-01

    A hollow, collapsable seal member normally disposed in a natural expanded state offering fail-safe pressure sealing against a seating surface and adapted to be evacuated by a vacuum force for collapsing the seal member to disengage the same from said seating surface.

  10. Collapsable seal member

    DOEpatents

    Sherrell, D.L.

    1983-12-08

    A hollow, collapsable seal member normally disposed in a natural expanded state offering fail-safe pressure sealing against a seating surface and adapted to be evacuated by a vacuum force for collapsing the seal member to disengage the same from said seating surface.

  11. 32 CFR 700.857 - Safe navigation and regulations governing operation of ships and aircraft.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFICIAL RECORDS The Commanding Officer Commanding Officers Afloat § 700.857 Safe navigation and regulations governing operation of ships and aircraft. (a) The commanding officer is responsible for the safe... Operations or the Commandant of the Marine Corps, as appropriate. (d) The Commanding Officer is responsible...

  12. 32 CFR 700.857 - Safe navigation and regulations governing operation of ships and aircraft.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICIAL RECORDS The Commanding Officer Commanding Officers Afloat § 700.857 Safe navigation and regulations governing operation of ships and aircraft. (a) The commanding officer is responsible for the safe... Operations or the Commandant of the Marine Corps, as appropriate. (d) The Commanding Officer is responsible...

  13. 32 CFR 700.857 - Safe navigation and regulations governing operation of ships and aircraft.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OFFICIAL RECORDS The Commanding Officer Commanding Officers Afloat § 700.857 Safe navigation and regulations governing operation of ships and aircraft. (a) The commanding officer is responsible for the safe... Operations or the Commandant of the Marine Corps, as appropriate. (d) The Commanding Officer is responsible...

  14. 32 CFR 700.857 - Safe navigation and regulations governing operation of ships and aircraft.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFICIAL RECORDS The Commanding Officer Commanding Officers Afloat § 700.857 Safe navigation and regulations governing operation of ships and aircraft. (a) The commanding officer is responsible for the safe... Operations or the Commandant of the Marine Corps, as appropriate. (d) The Commanding Officer is responsible...

  15. 32 CFR 700.857 - Safe navigation and regulations governing operation of ships and aircraft.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFICIAL RECORDS The Commanding Officer Commanding Officers Afloat § 700.857 Safe navigation and regulations governing operation of ships and aircraft. (a) The commanding officer is responsible for the safe... Operations or the Commandant of the Marine Corps, as appropriate. (d) The Commanding Officer is responsible...

  16. Design and evaluation of a sensor fail-operational control system for a digitally controlled turbofan engine

    NASA Technical Reports Server (NTRS)

    Hrach, F. J.; Arpasi, D. J.; Bruton, W. M.

    1975-01-01

    A self-learning, sensor fail-operational, control system for the TF30-P-3 afterburning turbofan engine was designed and evaluated. The sensor fail-operational control system includes a digital computer program designed to operate in conjunction with the standard TF30-P-3 bill-of-materials control. Four engine measurements and two compressor face measurements are tested. If any engine measurements are found to have failed, they are replaced by values synthesized from computer-stored information. The control system was evaluated by using a realtime, nonlinear, hybrid computer engine simulation at sea level static condition, at a typical cruise condition, and at several extreme flight conditions. Results indicate that the addition of such a system can improve the reliability of an engine digital control system.

  17. Parenteral nutrition combined with rice soup can be a safe and effective intervention for congenital chylous ascites.

    PubMed

    Cao, Yi; Yan, Weihui; Lu, Lina; Tao, Yijing; Lu, Wei; Chen, Yingwei; Tang, Qingya; Cai, Wei

    2016-01-01

    Congenital chylous ascites in the neonatal period is a rare entity. Total parenteral nutrition (TPN), medium chain triglyceride (MCT)-based diet, octreotide and repeated paracentesis are regarded as appropriate medical treatment for congenital chylous ascites, and surgery is recommended when conservative therapy has failed. We present two cases in which ascites were confirmed via an abdominal sonogram and diagnostic paracentesis. In our clinical experience, rice soup combined with PN can be a safe and effective intervention.

  18. Intraoperative endovascular ultrasonography

    NASA Astrophysics Data System (ADS)

    Eton, Darwin; Ahn, Samuel S.; Baker, J. D.; Pensabene, Joseph; Yeatman, Lawrence S.; Moore, Wesley S.

    1991-05-01

    The early experience using intra-operative endovascular ultrasonography (EU) is reported in eight patients undergoing lower extremity revasularization. In four patients, intra-operative EU successfully characterized inflow stenoses that were inadequately imaged with pre- operative arteriography. Two patients were found to have hemodynamically significant inflow stenoses, and were treated with intra-operative balloon angioplasty followed by repeat EU. The other two patients were found to have non-hemodynamically significant inflow stenoses requiring no treatment. Additional outflow procedures were required in all four patients. In the remaining four patients, EU was used to evaluate the completeness of TEC rotary atherectomy, of Hall oscillatory endarterectomy, of thrombectomy of the superficial femoral and popliteal arteries, and of valve lysis during in situ saphenous vein grafting, respectively. In the latter case, the valve leaflets were not clearly seen. In the other cases, EU assisted the surgeon. Angioscopy and angiography were available for comparison. In one case, angioscopy failed because of inability to clear the field while inspecting retrograde the limb of an aorto-bi-femoral graft. EU however was possible. No complications of EU occurred. EU is a safe procedure indicated when characterization of a lesion is needed prior to an intervention or when evaluation of the intervention's success is desired. We did not find it useful in valve lysis for in-site grafting.

  19. Meta-manager: a requirements analysis.

    PubMed

    Cook, J F; Rozenblit, J W; Chacko, A K; Martinez, R; Timboe, H L

    1999-05-01

    The digital imaging network-picture-archiving and communications system (DIN-PACS) will be implemented in ten sites within the Great Plains Regional Medical Command (GPRMC). This network of PACS and teleradiology technology over a shared T1 network has opened the door for round the clock radiology coverage of all sites. However, the concept of a virtual radiology environment poses new issues for military medicine. A new workflow management system must be developed. This workflow management system will allow us to efficiently resolve these issues including quality of care, availability, severe capitation, and quality of the workforce. The design process of this management system must employ existing technology, operate over various telecommunication networks and protocols, be independent of platform operating systems, be flexible and scaleable, and involve the end user at the outset in the design process for which it is developed. Using the unified modeling language (UML), the specifications for this new business management system were created in concert between the University of Arizona and the GPRMC. These specifications detail a management system operating through a common object request brokered architecture (CORBA) environment. In this presentation, we characterize the Meta-Manager management system including aspects of intelligence, interfacility routing, fail-safe operations, and expected improvements in patient care and efficiency.

  20. Gastrocnemius recession for recalcitrant plantar fasciitis in overweight and obese patients.

    PubMed

    Ficke, Brooks; Elattar, Osama; Naranje, Sameer M; Araoye, Ibukunoluwa; Shah, Ashish B

    2017-06-07

    Plantar fasciitis is a common foot pathology that is typically treated non-operatively. However, a minority of patients fail non-operative management, develop chronic symptoms, and request a surgical option. Gastrocnemius recession has recently been shown to be effective for the treatment of chronic plantar fasciitis. The purpose of this paper is to present evidence that gastrocnemius recession is safe and effective in the subset of chronic plantar fasciitis patients who are overweight and obese. We retrospectively reviewed 18 cases (17 patients) of chronic plantar fasciitis in overweight or obese patients who underwent gastrocnemius recession (mean age=46years, mean body mass index=34.7kg/m 2 , mean follow-up=20months). Data was gathered regarding pre-operative and post-operative pain (visual analog scale, 0-10), Foot Function Index score, and complications. Mean Foot Function Index score improved from 66.4 (range, 32.3-97.7) preoperatively to 26.5 (range, 0-89.4) postoperatively (p<0.01). Mean pain score improved from 8.3 (range, 5-10) preoperatively to 2.4 (range, 0-7) at final follow-up (p<0.01). Gastrocnemius recession improved foot function and pain symptoms in overweight and obese patients with chronic plantar fasciitis. Copyright © 2017 European Foot and Ankle Society. Published by Elsevier Ltd. All rights reserved.

  1. Design of Launch Abort System Thrust Profile and Concept of Operations

    NASA Technical Reports Server (NTRS)

    Litton, Daniel; O'Keefe, Stephen A.; Winski, Richard G.; Davidson, John B.

    2008-01-01

    This paper describes how the Abort Motor thrust profile has been tailored and how optimizing the Concept of Operations on the Launch Abort System (LAS) of the Orion Crew Exploration Vehicle (CEV) aides in getting the crew safely away from a failed Crew Launch Vehicle (CLV). Unlike the passive nature of the Apollo system, the Orion Launch Abort Vehicle will be actively controlled, giving the program a more robust abort system with a higher probability of crew survival for an abort at all points throughout the CLV trajectory. By optimizing the concept of operations and thrust profile the Orion program will be able to take full advantage of the active Orion LAS. Discussion will involve an overview of the development of the abort motor thrust profile and the current abort concept of operations as well as their effects on the performance of LAS aborts. Pad Abort (for performance) and Maximum Drag (for separation from the Launch Vehicle) are the two points that dictate the required thrust and shape of the thrust profile. The results in this paper show that 95% success of all performance requirements is not currently met for Pad Abort. Future improvements to the current parachute sequence and other potential changes will mitigate the current problems, and meet abort performance requirements.

  2. Simulation as a surgical teaching model.

    PubMed

    Ruiz-Gómez, José Luis; Martín-Parra, José Ignacio; González-Noriega, Mónica; Redondo-Figuero, Carlos Godofredo; Manuel-Palazuelos, José Carlos

    2018-01-01

    Teaching of surgery has been affected by many factors over the last years, such as the reduction of working hours, the optimization of the use of the operating room or patient safety. Traditional teaching methodology fails to reduce the impact of these factors on surgeońs training. Simulation as a teaching model minimizes such impact, and is more effective than traditional teaching methods for integrating knowledge and clinical-surgical skills. Simulation complements clinical assistance with training, creating a safe learning environment where patient safety is not affected, and ethical or legal conflicts are avoided. Simulation uses learning methodologies that allow teaching individualization, adapting it to the learning needs of each student. It also allows training of all kinds of technical, cognitive or behavioural skills. Copyright © 2017 AEC. Publicado por Elsevier España, S.L.U. All rights reserved.

  3. Value of gastrografin in adhesive small bowel obstruction after unsuccessful conservative treatment: A prospective evaluation

    PubMed Central

    Choi, Hok-Kwok; Law, Wai-Lun; Ho, Judy Wai-Chu; Chu, Kin-Wah

    2005-01-01

    AIM: Gastrografin is a hyperosmolar water-soluble contrast medium. Besides its predictive value for the need for operative treatment, a potential therapeutic role of this agent in adhesive small bowel obstruction has been suggested. This study aimed at evaluating the effectiveness of gastrografin in adhesive small bowel obstruction when conservative treatment failed. METHODS: Patients with adhesive small bowel obstruction were given trial conservative treatment unless there was fear of bowel strangulation. Those responded in the initial 48 h had conservative treatment continued. Patients who showed no improvement in the initial 48 h were given 100 mL of gastrografin through nasogastric tube followed by serial abdominal radiographs. Patients with the contrast appeared in large bowel within 24 h were regarded as having partial obstruction and conservative treatment was continued. Patients in which the contrast failed to reach large bowel within 24 h were considered to have complete obstruction and laparotomy was performed. RESULTS: Two hundred and twelve patients with 245 episodes of adhesive obstruction were included. Fifteen patients were operated on soon after admission due to fear of strangulation. One hundred and eighty-six episodes of obstruction showed improvement in the initial 48 h and conservative treatment was continued. Two patients had subsequent operations because of persistent obstruction. Forty-four episodes of obstruction showed no improvement within 48 h and gastrografin was administered. Seven patients underwent complete obstruction surgery. Partial obstruction was demonstrated in 37 other cases, obstruction resolved subsequently in all of them except one patient who required laparotomy because of persistent obstruction. The overall operative rate in this study was 10%. There was no complication that could be attributed to the use of gastrografin. CONCLUSION: The use of gastrografin in adhesive small bowel obstruction after unsuccessful conservative treatment is safe and reduces the need for surgical intervention. PMID:15968731

  4. Designing Flight-Deck Procedures

    NASA Technical Reports Server (NTRS)

    Degani, Asaf; Wiener, L.; Shafto, Mike (Technical Monitor)

    1995-01-01

    A complex human-machine system consists of more than merely one or more human operators and a collection of hardware components. In order to operate a complex system successfully, the human-machine system must be supported by an organizational infrastructure of operating concepts, rules, guidelines, and documents. The coherency of such operating concepts, in terms of consistency and logic, is vitally important for the efficiency and safety of any complex system. In high-risk endeavors such as aircraft operations, space flight, nuclear power production, manufacturing process control, and military operations, it is essential that such support be flawless, as the price of operational error can be high. When operating rules are not adhered to, or the rules are inadequate for the task at hand, not only will the system's goals be thwarted, but there may also be tragic human and material consequences. To ensure safe and predictable operations, support to the operators, in this case flight crews, often comes in the form of standard operating procedures. These provide the crew with step-by-step guidance for carrying out their operations. Standard procedures do indeed promote uniformity, but they do so at the risk of reducing the role of human operators to a lower level. Management, however, must recognize the danger of over-procedurization, which fails to exploit one of the most valuable assets in the system, the intelligent operator who is "on the scene." The alert system designer and operations manager recognize that there cannot be a procedure for everything, and the time will come in which the operators of a complex system will face a situation for which there is no written procedure. Procedures, whether executed by humans or machines, have their place, but so does human cognition.

  5. Obstetric Anaesthetists' Association and Difficult Airway Society guidelines for the management of difficult and failed tracheal intubation in obstetrics.

    PubMed

    Mushambi, M C; Kinsella, S M; Popat, M; Swales, H; Ramaswamy, K K; Winton, A L; Quinn, A C

    2015-11-01

    The Obstetric Anaesthetists' Association and Difficult Airway Society have developed the first national obstetric guidelines for the safe management of difficult and failed tracheal intubation during general anaesthesia. They comprise four algorithms and two tables. A master algorithm provides an overview. Algorithm 1 gives a framework on how to optimise a safe general anaesthetic technique in the obstetric patient, and emphasises: planning and multidisciplinary communication; how to prevent the rapid oxygen desaturation seen in pregnant women by advocating nasal oxygenation and mask ventilation immediately after induction; limiting intubation attempts to two; and consideration of early release of cricoid pressure if difficulties are encountered. Algorithm 2 summarises the management after declaring failed tracheal intubation with clear decision points, and encourages early insertion of a (preferably second-generation) supraglottic airway device if appropriate. Algorithm 3 covers the management of the 'can't intubate, can't oxygenate' situation and emergency front-of-neck airway access, including the necessity for timely perimortem caesarean section if maternal oxygenation cannot be achieved. Table 1 gives a structure for assessing the individual factors relevant in the decision to awaken or proceed should intubation fail, which include: urgency related to maternal or fetal factors; seniority of the anaesthetist; obesity of the patient; surgical complexity; aspiration risk; potential difficulty with provision of alternative anaesthesia; and post-induction airway device and airway patency. This decision should be considered by the team in advance of performing a general anaesthetic to make a provisional plan should failed intubation occur. The table is also intended to be used as a teaching tool to facilitate discussion and learning regarding the complex nature of decision-making when faced with a failed intubation. Table 2 gives practical considerations of how to awaken or proceed with surgery. The background paper covers recommendations on drugs, new equipment, teaching and training. © 2015 The Authors. Anaesthesia published by John Wiley & Sons Ltd on behalf of Association of Anaesthetists of Great Britain and Ireland.

  6. Obstetric Anaesthetists' Association and Difficult Airway Society guidelines for the management of difficult and failed tracheal intubation in obstetrics*

    PubMed Central

    Mushambi, M C; Kinsella, S M; Popat, M; Swales, H; Ramaswamy, K K; Winton, A L; Quinn, A C

    2015-01-01

    The Obstetric Anaesthetists' Association and Difficult Airway Society have developed the first national obstetric guidelines for the safe management of difficult and failed tracheal intubation during general anaesthesia. They comprise four algorithms and two tables. A master algorithm provides an overview. Algorithm 1 gives a framework on how to optimise a safe general anaesthetic technique in the obstetric patient, and emphasises: planning and multidisciplinary communication; how to prevent the rapid oxygen desaturation seen in pregnant women by advocating nasal oxygenation and mask ventilation immediately after induction; limiting intubation attempts to two; and consideration of early release of cricoid pressure if difficulties are encountered. Algorithm 2 summarises the management after declaring failed tracheal intubation with clear decision points, and encourages early insertion of a (preferably second-generation) supraglottic airway device if appropriate. Algorithm 3 covers the management of the ‘can't intubate, can't oxygenate’ situation and emergency front-of-neck airway access, including the necessity for timely perimortem caesarean section if maternal oxygenation cannot be achieved. Table 1 gives a structure for assessing the individual factors relevant in the decision to awaken or proceed should intubation fail, which include: urgency related to maternal or fetal factors; seniority of the anaesthetist; obesity of the patient; surgical complexity; aspiration risk; potential difficulty with provision of alternative anaesthesia; and post-induction airway device and airway patency. This decision should be considered by the team in advance of performing a general anaesthetic to make a provisional plan should failed intubation occur. The table is also intended to be used as a teaching tool to facilitate discussion and learning regarding the complex nature of decision-making when faced with a failed intubation. Table 2 gives practical considerations of how to awaken or proceed with surgery. The background paper covers recommendations on drugs, new equipment, teaching and training. PMID:26449292

  7. Environmental Control and Life Support Systems Test Facility at MSFC

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Marshall Space Flight Center (MSFC) is responsible for designing and building the life support systems that will provide the crew of the International Space Station (ISS) a comfortable environment in which to live and work. Scientists and engineers at the MSFC are working together to provide the ISS with systems that are safe, efficient, and cost-effective. These compact and powerful systems are collectively called the Environmental Control and Life Support Systems, or simply, ECLSS. In this photograph, the life test area on the left of the MSFC ECLSS test facility is where various subsystems and components are tested to determine how long they can operate without failing and to identify components needing improvement. Equipment tested here includes the Carbon Dioxide Removal Assembly (CDRA), the Urine Processing Assembly (UPA), the mass spectrometer filament assemblies and sample pumps for the Major Constituent Analyzer (MCA). The Internal Thermal Control System (ITCS) simulator facility (in the module in the right) duplicates the function and operation of the ITCS in the ISS U.S. Laboratory Module, Destiny. This facility provides support for Destiny, including troubleshooting problems related to the ITCS.

  8. Telemetry and control system for interplatform crude loading at the Statfjord Field

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malmin, P.C.; Lassa, P.

    1986-01-01

    A control system for crude loading to tankers at the Statfjord field has been designed by Mobil Exploration Norway Inc. The objective of the interplatform crude tieline and control system was to allow tanker loading to take place at all times in order to prevent production shutdowns due to loading buoy problems. The control system has been designed to maximize the flexibility of loading operations and meet all safety and regulatory requirements. This paper discusses the design criteria for the crude tieline control system, and describes how these were met by utilizing fail safe telemetry equipment, hardwired permissive relay logicmore » and programmable logic controllers (PLC's). The experience gained from more than three years of operation of the system is reviewed. The system has allowed maximum use of total field storage capacity while loading crude to 125000 DWT tankers nearly every day throughout the year. It has been possible to maintain a high production rate event through periods of difficult weather conditions as experienced in the northern North Sea.« less

  9. International Space Station (ISS)

    NASA Image and Video Library

    2001-02-01

    The Marshall Space Flight Center (MSFC) is responsible for designing and building the life support systems that will provide the crew of the International Space Station (ISS) a comfortable environment in which to live and work. Scientists and engineers at the MSFC are working together to provide the ISS with systems that are safe, efficient, and cost-effective. These compact and powerful systems are collectively called the Environmental Control and Life Support Systems, or simply, ECLSS. In this photograph, the life test area on the left of the MSFC ECLSS test facility is where various subsystems and components are tested to determine how long they can operate without failing and to identify components needing improvement. Equipment tested here includes the Carbon Dioxide Removal Assembly (CDRA), the Urine Processing Assembly (UPA), the mass spectrometer filament assemblies and sample pumps for the Major Constituent Analyzer (MCA). The Internal Thermal Control System (ITCS) simulator facility (in the module in the right) duplicates the function and operation of the ITCS in the ISS U.S. Laboratory Module, Destiny. This facility provides support for Destiny, including troubleshooting problems related to the ITCS.

  10. Identification, analysis, and remedial treatment of low guardrail in Virginia.

    DOT National Transportation Integrated Search

    1981-01-01

    Guardrails that are too low may fail to safely redirect errant vehicles; instead, the vehicles may vault the guardrails, resulting in severe accidents. An analysis of data on a small sample of guardrails throughout-Virginia showed that over 80% of th...

  11. 77 FR 6122 - Providing Refurbishment Services to Federal Agencies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... equipment? 5. Describe the process for disposing and recycling of failed equipment. Have all facilities in your recycling and disposal process been certified to safely recycle and manage electronics? If so... firms offering refurbishment services, including those developed specifically for recycling facilities...

  12. The Legacy of Space Shuttle Flight Software

    NASA Technical Reports Server (NTRS)

    Hickey, Christopher J.; Loveall, James B.; Orr, James K.; Klausman, Andrew L.

    2011-01-01

    The initial goals of the Space Shuttle Program required that the avionics and software systems blaze new trails in advancing avionics system technology. Many of the requirements placed on avionics and software were accomplished for the first time on this program. Examples include comprehensive digital fly-by-wire technology, use of a digital databus for flight critical functions, fail operational/fail safe requirements, complex automated redundancy management, and the use of a high-order software language for flight software development. In order to meet the operational and safety goals of the program, the Space Shuttle software had to be extremely high quality, reliable, robust, reconfigurable and maintainable. To achieve this, the software development team evolved a software process focused on continuous process improvement and defect elimination that consistently produced highly predictable and top quality results, providing software managers the confidence needed to sign each Certificate of Flight Readiness (COFR). This process, which has been appraised at Capability Maturity Model (CMM)/Capability Maturity Model Integration (CMMI) Level 5, has resulted in one of the lowest software defect rates in the industry. This paper will present an overview of the evolution of the Primary Avionics Software System (PASS) project and processes over thirty years, an argument for strong statistical control of software processes with examples, an overview of the success story for identifying and driving out errors before flight, a case study of the few significant software issues and how they were either identified before flight or slipped through the process onto a flight vehicle, and identification of the valuable lessons learned over the life of the project.

  13. Retrograde recanalization of chronic total occlusions from the transradial approach; early Canadian experience.

    PubMed

    Rinfret, Stéphane; Joyal, Dominique; Nguyen, Can Manh; Bagur, Rodrigo; Hui, William; Leung, Raymond; Larose, Eric; Love, Michael P; Mansour, Samer

    2011-09-01

    Retrograde approach for chronic total occlusions (CTO) improves recanalization success rates. Eight French (Fr) catheters and the femoral approach are advocated. Evaluate whether transradial operators can achieve similar success rates using smaller catheters. This is a single-operator series of 42 consecutive cases performed between January and December 2010, including 13 while demonstrating CTO recanalization. Patients were referred because of complexity of the CTO or after failed attempt. Most frequent indications for recanalization were CCS 3-4 angina (52%) and CCS 1-2 in 21%. Eighteen (43%) patients underwent previous failed attempts. CTO was in the right coronary in 74%, left anterior descending in 24%, and a left main in 1. Most lesions (88%) were ≥20 mm long and 52% were calcified. We used septal collateral channels (CC) in 33 (79%), epicardial CC in 8 (20%), and a saphenous vein graft in one case. Radial access was used in all patients and was bilateral in 37 (88%). Five cases required one radial and one femoral access. Six French guides were used in 91% for the retrograde side and 71% for the antegrade side. Otherwise, 7 Fr guides were used. The Corsair(®) was used in 38 (90%). Procedural success was achieved in 37 (88%), mostly using reverse controlled antegrade-retrograde tracking (60%) or retrograde crossing (29%). The average <24-h Hb drop was 0.75 ± 0.84 g/dl. No in-hospital major cardiac events occurred. Transradial retrograde CTO recanalization is feasible, safe, and still associated with high success rates despite the use of smaller guide catheters. Copyright © 2011 Wiley-Liss, Inc.

  14. Strategies for Countering Terrorist Safe Havens

    DTIC Science & Technology

    2014-02-20

    within safe havens, tactical containment, pseudo operations, and surrogate security forces. The thesis draws from four historical case studies to...leadership targeting within safe havens, tactical containment, pseudo operations, and surrogate security forces. The thesis draws from four historical case ...surrogate forces and pseudo operations—provide viable potential options for USSOF to counter the complex problem of safe havens. Overall, the case

  15. Simple Automatic File Exchange (SAFE) to Support Low-Cost Spacecraft Operation via the Internet

    NASA Technical Reports Server (NTRS)

    Baker, Paul; Repaci, Max; Sames, David

    1998-01-01

    Various issues associated with Simple Automatic File Exchange (SAFE) are presented in viewgraph form. Specific topics include: 1) Packet telemetry, Internet IP networks and cost reduction; 2) Basic functions and technical features of SAFE; 3) Project goals, including low-cost satellite transmission to data centers to be distributed via an Internet; 4) Operations with a replicated file protocol; 5) File exchange operation; 6) Ground stations as gateways; 7) Lessons learned from demonstrations and tests with SAFE; and 8) Feedback and future initiatives.

  16. Hubble (HST) hardware arrives at KSC for servicing mission, STS-103

    NASA Technical Reports Server (NTRS)

    1999-01-01

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) sits on a flatbed trailer for transfer to the Payload Hazardous Servicing Facility where it will undergo final testing and integration of payload elements. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review.

  17. Hubble (HST) hardware is unwrapped in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a worker begins to open the protective covering over a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  18. Failed Ventriculoperitoneal Shunt: Is Retrograde Ventriculosinus Shunt a Reliable Option?

    PubMed

    Oliveira, Matheus Fernandes de; Teixeira, Manoel Jacobsen; Reis, Rodolfo Casimiro; Petitto, Carlo Emanuel; Gomes Pinto, Fernando Campos

    2016-08-01

    Currently, the treatment of hydrocephalus is mainly carried out through a ventriculoperitoneal shunt (VPS) insertion. However, in some cases, there may be surgical revisions and requirement of an alternative distal site for shunting. There are several described distal sites, and secondary options after VPS include ventriculopleural and ventriculoatrial shunt, which have technical difficulties and harmful complications. In this preliminary report we describe our initial experience with retrograde ventriculosinus shunt (RVSS) after failed VPS. In 3 consecutive cases we applied RVSS to treat hydrocephalus in shunt-dependent patients who had previously undergone VPS revision and in which peritoneal space was full of adhesions and fibrosis. RVSS was performed as described by Shafei et al., with some modifications to each case. All 3 patients kept the same clinical profile after RVSS, with no perioperative or postoperative complications. However, revision surgery was performed in the first operative day in 1 out of 3 patients, in which the catheter was not positioned in the superior sagittal sinus. We propose that in cases where VPS is not feasible, RVSS may be a safe and applicable second option. Nevertheless, the long-term follow-up of patients and further learning curve must bring stronger evidence. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  20. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  1. Laparoscopic ureterolysis with simultaneous ureteroscopy and percutaneous nephroscopy for treating complex ureteral obstruction after failed endoscopic intervention: A technical report.

    PubMed

    Wang, Zhixiang; Liu, Bing; Gao, Xiaofeng; Bao, Yi; Wang, Yang; Ye, Huamao; Sun, Yinghao; Wang, Linhui

    2015-10-01

    Complex ureteral obstruction is refractory to conventional urological intervention. This report describes a case of laparoscopic ureterolysis with simultaneous ureteroscopy and percutaneous nephroscopy for treating complex ureteral obstruction. Right-side multiple ureteral stones and complicating ureteral obstruction failed an initial attempt of ureteroscopy lithotripsy with simultaneous percutaneous nephroscopy in a 23-year-old male. Laparoscopic ureterolysis with ureteroscopy and percutaneous nephroscopy was used simultaneously to dissect the periureteral adhesions with the patient placed in the Galdakao-modified supine Valdivia position. The ureter was incised to allow the insertion of a ureteral catheter through the twisted ureter, and a guide wire was advanced into the pelvis using ureteroscopy. A double-J stent was placed into the right-side ureter using antegrade percutaneous nephroscopy. The laparoendoscopic procedure lasted 330 min with an estimated bleeding volume of 100 mL. The patient underwent an uneventful postoperative course, and postoperative follow-up radiography confirmed good positioning of the double-J stent. The double-J stent was removed 3 months after operation. The patient remained asymptomatic within a 13-month follow-up period. Laparoscopic ureterolysis with simultaneous ureteroscopy and percutaneous nephroscopy is an effective and safe treatment option for complex ureteral obstruction.

  2. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    After making a turn in front of the Orbiter Processing Facility (OPF) bay 1, the orbiter Discovery begins moving along the tow-way to the Vehicle Assembly Building as KSC workers watch. At the VAB, Discovery will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  3. Endoscope-assisted laparoscopic repair of perforated peptic ulcers.

    PubMed

    Lee, Kun-Hua; Chang, Hung-Chi; Lo, Chong-Jeh

    2004-04-01

    Laparoscopic repairs for perforated peptic ulcer (PPU) are likely to fail in patients with shock, gastric outlet obstruction, or large perforations. This prospective study was performed to evaluate a revised approach of laparoscopic repair with endoscopic assistance to treat these patients. Between April 2001 and February 2002, 30 consecutive patients with PPU were enrolled in this study. The mean age was 43.1 +/- 12.2 years. Male to female ratio was 27:2. One patient was excluded from laparoscopic repair due to a gastric outlet obstruction. The other 29 patients were managed according to a protocol of preoperative upper endoscopy and laparoscopic intracorporeal suture repair with an omental patch. The average operative time was 58.1 +/- 13.5 minutes (range, 36-96 min). The average diameter of perforation was 4.2 +/- 2.0 mm (range, 1-12 mm). The average time to resume oral fluids was 3.2 +/- 0.8 days (range, 2-8 days). The average hospital stay was 4.7 +/- 1.1 days (range, 3-10 days). There was no leakage or mortality. Most patients did not receive parenteral analgesics postoperatively. We conclude that endoscope-assisted laparoscopic repair for PPU is safe and effective. This revised technique allows surgeons to exclude patients who are likely to fail the laparoscopic repair.

  4. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, some of the STS-103 crew look over lubrication devices to be used during their mission. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  5. KSC-99pp1038

    NASA Image and Video Library

    1999-08-12

    A C-5 air cargo plane opens to reveal a shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  6. KSC-99pp1039

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is ready for transfer onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  7. KSC-99pp1087

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, some of the STS-103 crew look over lubrication devices to be used during their mission. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  8. KSC-99pp1041

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) sits on a flatbed trailer for transfer to the Payload Hazardous Servicing Facility where it will undergo final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  9. KSC-99pp1050

    NASA Image and Video Library

    1999-08-13

    KENNEDY SPACE CENTER, FLA. -- Inside the Payload Hazardous Servicing Facility (PHSF), a part of payload flight hardware, intended for the third Hubble Space Telescope Servicing Mission (SM-3A), is revealed after its protective cover has been removed. The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  10. KSC-99pp1043

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  11. KSC-99pp1042

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  12. KSC-99pp1040

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is transferred onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  13. KSC-99pp1278

    NASA Image and Video Library

    1999-11-04

    KENNEDY SPACE CENTER, FLA. -- After making a turn in front of the Orbiter Processing Facility (OPF) bay 1, the orbiter Discovery begins moving along the tow-way to the Vehicle Assembly Building as KSC workers watch. At the VAB, Discovery will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode

  14. KSC-99pp1037

    NASA Image and Video Library

    1999-08-12

    A C-5 air cargo plane lands at Kennedy Space Center carrying the payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  15. KSC-99pp1044

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  16. Hubble (HST) hardware is moved to a workstand in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  17. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  18. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  19. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  20. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  1. AP1000{sup R} nuclear power plant safety overview for spent fuel cooling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gorgemans, J.; Mulhollem, L.; Glavin, J.

    2012-07-01

    The AP1000{sup R} plant is an 1100-MWe class pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and costs. The AP1000 design uses passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems such as AC power, component cooling water, service water or HVAC. Furthermore, these passive features 'fail safe' during a non-LOCA event such that DC power and instrumentation are not required. The AP1000 also has simple, active, defense-in-depth systems to support normal plant operations. These active systems provide the first levelmore » of defense against more probable events and they provide investment protection, reduce the demands on the passive features and support the probabilistic risk assessment. The AP1000 passive safety approach allows the plant to achieve and maintain safe shutdown in case of an accident for 72 hours without operator action, meeting the expectations provided in the U.S. Utility Requirement Document and the European Utility Requirements for passive plants. Limited operator actions are required to maintain safe conditions in the spent fuel pool via passive means. In line with the AP1000 approach to safety described above, the AP1000 plant design features multiple, diverse lines of defense to ensure spent fuel cooling can be maintained for design-basis events and beyond design-basis accidents. During normal and abnormal conditions, defense-in-depth and other systems provide highly reliable spent fuel pool cooling. They rely on off-site AC power or the on-site standby diesel generators. For unlikely design basis events with an extended loss of AC power (i.e., station blackout) or loss of heat sink or both, spent fuel cooling can still be provided indefinitely: - Passive systems, requiring minimal or no operator actions, are sufficient for at least 72 hours under all possible pool heat load conditions. - After 3 days, several different means are provided to continue spent fuel cooling using installed plant equipment as well as off-site equipment with built-in connections. Even for beyond design basis accidents with postulated pool damage and multiple failures in the passive safety-related systems and in the defense-in-depth active systems, the AP1000 multiple spent fuel pool spray and fill systems provide additional lines of defense to prevent spent fuel damage. (authors)« less

  2. Fatigue analysis of composite materials using the fail-safe concept

    NASA Technical Reports Server (NTRS)

    Stievenard, G.

    1982-01-01

    If R1 is the probability of having a crack on a flight component and R2 is the probability of seeing this crack propagate between two scheduled inspections, the global failure regulation states that this product must not exceed 0.0000001.

  3. Verification Methodology of Fault-tolerant, Fail-safe Computers Applied to MAGLEV Control Computer Systems

    DOT National Transportation Integrated Search

    1993-05-01

    The Maglev control computer system should be designed to verifiably possess high reliability and safety as well as high availability to make Maglev a dependable and attractive transportation alternative to the public. A Maglev computer system has bee...

  4. CAT-tailing as a fail-safe mechanism for efficient degradation of stalled nascent polypeptides.

    PubMed

    Kostova, Kamena K; Hickey, Kelsey L; Osuna, Beatriz A; Hussmann, Jeffrey A; Frost, Adam; Weinberg, David E; Weissman, Jonathan S

    2017-07-28

    Ribosome stalling leads to recruitment of the ribosome quality control complex (RQC), which targets the partially synthesized polypeptide for proteasomal degradation through the action of the ubiquitin ligase Ltn1p. A second core RQC component, Rqc2p, modifies the nascent polypeptide by adding a carboxyl-terminal alanine and threonine (CAT) tail through a noncanonical elongation reaction. Here we examined the role of CAT-tailing in nascent-chain degradation in budding yeast. We found that Ltn1p efficiently accessed only nascent-chain lysines immediately proximal to the ribosome exit tunnel. For substrates without Ltn1p-accessible lysines, CAT-tailing enabled degradation by exposing lysines sequestered in the ribosome exit tunnel. Thus, CAT-tails do not serve as a degron, but rather provide a fail-safe mechanism that expands the range of RQC-degradable substrates. Copyright © 2017 The Authors, some rights reserved; exclusive licensee American Association for the Advancement of Science. No claim to original U.S. Government Works.

  5. The fail-safe mechanism of post-transcriptional silencing of unspliced HAC1 mRNA.

    PubMed

    Di Santo, Rachael; Aboulhouda, Soufiane; Weinberg, David E

    2016-10-01

    HAC1 encodes a transcription factor that is the central effector of the unfolded protein response (UPR) in budding yeast. When the UPR is inactive, HAC1 mRNA is stored as an unspliced isoform in the cytoplasm and no Hac1 protein is detectable. Intron removal is both necessary and sufficient to relieve the post-transcriptional silencing of HAC1 mRNA, yet the precise mechanism by which the intron prevents Hac1 protein accumulation has remained elusive. Here, we show that a combination of inhibited translation initiation and accelerated protein degradation-both dependent on the intron-prevents the accumulation of Hac1 protein when the UPR is inactive. Functionally, both components of this fail-safe silencing mechanism are required to prevent ectopic production of Hac1 protein and concomitant activation of the UPR. Our results provide a mechanistic understanding of HAC1 regulation and reveal a novel strategy for complete post-transcriptional silencing of a cytoplasmic mRNA.

  6. Clinical Operational Tolerance After Renal Transplantation

    PubMed Central

    Orlando, Giuseppe; Hematti, Peiman; Stratta, Robert J.; Burke, George W.; Di Cocco, Pierpaolo; Pisani, Francesco; Soker, Shay; Wood, Kathryn

    2015-01-01

    In solid organ transplantation, the achievement of an immunosuppression (IS)-free state [also referred to as clinical operational tolerance (COT)] represents the ultimate goal. Although COT is feasible and safe in selected cases after liver transplantation, it is an exceptional finding after other types of solid organ transplantation. In the field of renal transplantation (RT), approximately 100 cases of COT have been reported to date, mainly in patients who were not compliant with their immunosuppressive regimens or in individuals who had previously received a bone marrow transplant for hematological disorders. On the basis of promising results obtained in animal models, several tolerogenic protocols have been attempted in humans, but most have failed to achieve robust and stable COT after RT. Molecule-based regimens have been largely ineffective, whereas cell-based regimens have provided some encouraging results. In these latter regimens, apart from standard IS, patients usually receive perioperative infusion of donor bone marrow–derived stem cells, which are able to interact with the immune cells of the host and mitigate their response to engraftment. Unfortunately, most renal transplant patients who developed acute rejection—occurring either during the weaning protocol or after complete withdrawal of IS—eventually lost their grafts. Currently, the immune monitoring necessary for predicting the presence and persistence of donor-specific unresponsiveness is not available. Overall, the present review will provide a conceptual framework for COT and conclude that stable and robust COT after RT remains an elusive goal and that the different strategies attempted to date are not yet reproducibly safe or effective. PMID:21107102

  7. 50 CFR 218.124 - Mitigation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... safe speed. Release of ordinance through cloud cover is prohibited: Aircraft must be able to see... m) or lower, if safe to do so, and at the slowest safe speed. Firing or range clearance aircraft... speed, if operationally feasible and weather conditions permit. In dual aircraft operations, crews are...

  8. 50 CFR 218.124 - Mitigation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... safe speed. Release of ordinance through cloud cover is prohibited: Aircraft must be able to see... m) or lower, if safe to do so, and at the slowest safe speed. Firing or range clearance aircraft... speed, if operationally feasible and weather conditions permit. In dual aircraft operations, crews are...

  9. 50 CFR 218.124 - Mitigation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... safe speed. Release of ordinance through cloud cover is prohibited: Aircraft must be able to see... m) or lower, if safe to do so, and at the slowest safe speed. Firing or range clearance aircraft... speed, if operationally feasible and weather conditions permit. In dual aircraft operations, crews are...

  10. 50 CFR 218.124 - Mitigation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... safe speed. Release of ordinance through cloud cover is prohibited: Aircraft must be able to see... m) or lower, if safe to do so, and at the slowest safe speed. Firing or range clearance aircraft... speed, if operationally feasible and weather conditions permit. In dual aircraft operations, crews are...

  11. Saccharomyces cerevisiae RNA Polymerase I Terminates Transcription at the Reb1 Terminator In Vivo

    PubMed Central

    Reeder, Ronald H.; Guevara, Palmira; Roan, Judith G.

    1999-01-01

    We have mapped transcription termination sites for RNA polymerase I in the yeast Saccharomyces cerevisiae. S1 nuclease mapping shows that the primary terminator is the Reb1p terminator located at +93 downstream of the 3′ end of 25S rRNA. Reverse transcription coupled with quantitative PCR shows that approximately 90% of all transcripts terminate at this site. Transcripts which read through the +93 site quantitatively terminate at a fail-safe terminator located further downstream at +250. Inactivation of Rnt1p (an RNase III involved in processing the 3′ end of 25S rRNA) greatly stabilizes transcripts extending to both sites and increases readthrough at the +93 site. In vivo assay of mutants of the Reb1p terminator shows that this site operates in vivo by the same mechanism as has previously been delineated through in vitro studies. PMID:10523625

  12. [Obstructive cholangiopathy: are endoscopic retrograde cholangiopancreatography and papillotomy always really necessary?].

    PubMed

    Pierie, J P; van Vroonhoven, T J

    1999-07-17

    In two women aged 76 and 29 years, who presented with cholangitis and small ductus choledochus calculi and with painless icterus respectively, endoscopic retrograde cholangiopancreatography (ERCP) was carried out with papillotomy. Both developed a duodenal perforation which, however, could not be localized. The first patient eventually died, the second recovered after prolonged hospitalization. A third patient, a 53-year-old man, developed abdominal pain and fever four days after laparoscopic cholecystectomy. ERCP was planned, but in the meantime the patient showed signs of recovery. The ERCP was carried out nevertheless. It failed and the patient suffered a prolonged recovery with necrotizing pancreatitis and multiple operations necessitating a temporary colostoma. In all three patients the endoscopic procedure was performed routinely without strict individualized indication. ERCP and papillotomy may be relatively safe procedures, but it should always be considered whether they will really serve the patient.

  13. Initial experience with the Europass: a new ultra-low profile monorail balloon catheter.

    PubMed

    Zimarino, M; Corcos, T; Favereau, X; Tamburino, C; Toussaint, M; Spaulding, C; Guérin, Y

    1994-09-01

    One of the causes for percutaneous transluminal coronary angioplasty (PTCA) failure is the inability to cross the lesion with the balloon catheter after guidewire positioning. The Europass coronary angioplasty catheter is a monorail Duralyn balloon catheter developed to enhance lesion crossability and to overcome this limitation. This system was evaluated in 50 patients in which target lesions were chronic total coronary occlusions (12 cases) or stenoses that could not be reached or crossed by other new monorail balloon catheters. Overall procedural success was obtained in 49/50 patients (98%), using a single Europass balloon catheter in 46/50 patients (92%), with no in-hospital complications. Its low profile, small distal shaft, and excellent trackability allowed successful angioplasty in cases where other catheters failed. This balloon catheter represents a significant advance in angioplasty technology and can be considered as a first-choice device for a safe and expeditious single-operator procedure.

  14. Transfascial vaginal tape (TFT): a simple, safe and cost-effective procedure for stress urinary incontinence. A preliminary study.

    PubMed

    Foglia, Giovanni; Mistrangelo, Emanuela; Lijoi, Davide; Alessandri, Franco; Ragni, Nicola

    2007-07-01

    To analyse prospectively the effectiveness of a new simple, minimally invasive, and cost-effective technique for the treatment of female urinary stress incontinence: the transfascial vaginal tape (TFT). In a prospective study, we enrolled 45 women undergoing TFT with or without hysterectomy and/or another pelvic reconstructive procedure between 1st December 2003 and 31st December. TFT consists of a tension-free urethrosuspension using a sling located at the mid-urethral level and placed laterally in the endopelvic fascia previously perforated. Follow-up evaluations were established at 3 and 6 months and at 1 year after the operation. During each follow-up, women underwent cough stress test and they answered to the "Incontinence quality of life questionnaire" (I-QOL), to the Patient Global Impression of Severity (PGI-S) and of Improvement (PGI-I) questions. Thirty-nine patients (88.9%) had a follow-up examination 1 year after surgery. Of these, 30 (76.9%) were defined cured, 6 (15.4%) improved and 3 (7.7%) failed. TFT procedure can be considered a simple, safe and cost-effective procedure for the treatment of stress urinary incontinence and can be an alternative to tension-free vaginal tape or transobturator route for sub-urethral tape procedures.

  15. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2016-01-01

    Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

  16. Description and comparative evaluation of a proposed design for the low visibility approach study

    DOT National Transportation Integrated Search

    1985-10-01

    Ths memorandum was prepared in support of the low visibility simulation study being : conducted by the FAA as a basis for establishing the lowest RVR (runway visual range) : required for safe, fail passive auto landings in Category III weather. A des...

  17. 78 FR 57542 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... cracked retract actuator fuse pins that could fail earlier than the previously determined safe life limit... 5 p.m., Monday through Friday, except Federal holidays. For service information identified in this proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC...

  18. Safely Enabling Civilian Unmanned Aerial System (UAS) Operations in Low-Altitude Airspace by Unmanned Aerial System Traffic Management (UTM)

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal Hemchandra

    2015-01-01

    Many UAS will operate at lower altitude (Class G, below 2000 feet). There is an urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.

  19. Safely Enabling Civilian Unmanned Aerial System (UAS) Operations In Low-Altitude Airspace By Unmanned Aerial System Traffic Management (UTM)

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2015-01-01

    Many UAS will operate at lower altitude (Class G, below 2000 feet)There is urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.

  20. 78 FR 57319 - Children's Online Privacy Protection Rule Safe Harbor Proposed Self-Regulatory Guidelines...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...-AB20 Children's Online Privacy Protection Rule Safe Harbor Proposed Self-Regulatory Guidelines; kidSAFE... proposed self-regulatory guidelines submitted by the kidSAFE Seal Program (``kidSAFE''), owned and operated... part of the SUPPLEMENTARY INFORMATION section below. Write ``kidSAFE Application for Safe Harbor...

  1. New Algorithms Manage Fourfold Redundancy

    NASA Technical Reports Server (NTRS)

    Gelderloos, H. C.

    1982-01-01

    Redundant sensors, actuators, and computers improve reliability of complex control systems, such as those in nuclear powerplants and aircraft. If one or more redundant elements fail, another takes over so that normal operation is not interrupted. Quad selection filter rejects data from null-failed and hardover-failed and hardover-failed units.

  2. Strapdown system redundancy management flight demonstration. [vertical takeoff and landing aircraft

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The suitability of strapdown inertial systems in providing highly reliable short-term navigation for vertical take-off and landing (VTOL) aircraft operating in an intra-urban setting under all-weather conditions was assessed. A preliminary design configuration of a skewed sensor inertial reference system employing a redundancy management concept to achieve fail-operational, fail-operational performance, was developed.

  3. [Laparoscopic Heller myotomy after failed POEM and multiple balloon dilatations : Better late than never].

    PubMed

    Giulini, L; Dubecz, A; Stein, H J

    2017-04-01

    Despite the lack of long-term results, peroral endoscopic myotomy (POEM) has been increasingly propagated as a feasible alternative to pneumatic balloon dilatation (BD) and laparoscopic Heller myotomy (LHM) in patients with achalasia. After a long-term follow-up, a large percentage of patients reported recurrence of dysphagia. It is unclear which kind of procedure (redo POEM or LHM) should be utilized in these patients with failed POEM. We report the case of a 37-year-old female patient with type I achalasia who was successfully treated with LHM after a failed POEM procedure. After the manometric diagnosis of type I achalasia, the patient was treated with six balloon dilatations within a period of 5 months. Because of the persistence of symptoms a POEM procedure was performed with no relief and the patient was referred for surgical treatment. An esophagography showed a pronounced widening of the middle and the distal esophagus with a persistent narrowing of the lower esophageal sphincter (LES) and because of these indications LHM was performed. The intraoperative examination revealed extensive scarring of the submucosal layer with the muscularis mucosae of the distal esophagus; nevertheless, it was possible to carry out a 5 cm long cardiomyotomy without mucosal injury. The operation was completed with a Dor fundoplication. There were no postoperative complications. After surgery the patient reported an immediate and complete relief of dysphagia. The published experiences with POEM seem to show promising short-term results in terms of dysphagia relief; however, the few available mid-term analyses demonstrated no essential advantages when compared to LHM; therefore, the LHM must still be considered the gold standard procedure for definitive treatment of achalasia. According to our case report, LHM was shown to be a safe and effective although laborious treatment option due to scarring even after failed treatment by POEM.

  4. 26 CFR 53.4942(b)-3 - Determination of compliance with operating foundation tests.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... is likely to qualify as an operating foundation on the basis of its 2d, 3d, and 4th taxable years. Thus, if such an organization fails to qualify as an operating foundation in its 2d, 3d, or 4th taxable... not an operating foundation as of the 1st day of such 2d, 3d, or 4th taxable year in which it fails to...

  5. 26 CFR 53.4942(b)-3 - Determination of compliance with operating foundation tests.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... is likely to qualify as an operating foundation on the basis of its 2d, 3d, and 4th taxable years. Thus, if such an organization fails to qualify as an operating foundation in its 2d, 3d, or 4th taxable... not an operating foundation as of the 1st day of such 2d, 3d, or 4th taxable year in which it fails to...

  6. 26 CFR 53.4942(b)-3 - Determination of compliance with operating foundation tests.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... is likely to qualify as an operating foundation on the basis of its 2d, 3d, and 4th taxable years. Thus, if such an organization fails to qualify as an operating foundation in its 2d, 3d, or 4th taxable... not an operating foundation as of the 1st day of such 2d, 3d, or 4th taxable year in which it fails to...

  7. 26 CFR 53.4942(b)-3 - Determination of compliance with operating foundation tests.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... is likely to qualify as an operating foundation on the basis of its 2d, 3d, and 4th taxable years. Thus, if such an organization fails to qualify as an operating foundation in its 2d, 3d, or 4th taxable... not an operating foundation as of the 1st day of such 2d, 3d, or 4th taxable year in which it fails to...

  8. 26 CFR 53.4942(b)-3 - Determination of compliance with operating foundation tests.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... is likely to qualify as an operating foundation on the basis of its 2d, 3d, and 4th taxable years. Thus, if such an organization fails to qualify as an operating foundation in its 2d, 3d, or 4th taxable... not an operating foundation as of the 1st day of such 2d, 3d, or 4th taxable year in which it fails to...

  9. 12 CFR 238.8 - Safe and sound operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 4 2013-01-01 2013-01-01 false Safe and sound operations. 238.8 Section 238.8... (CONTINUED) SAVINGS AND LOAN HOLDING COMPANIES (REGULATION LL) General Provisions § 238.8 Safe and sound... inconsistent with sound banking principles or the purposes of HOLA or the Financial Institutions Supervisory...

  10. 12 CFR 238.8 - Safe and sound operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Safe and sound operations. 238.8 Section 238.8... (CONTINUED) SAVINGS AND LOAN HOLDING COMPANIES (REGULATION LL) General Provisions § 238.8 Safe and sound... inconsistent with sound banking principles or the purposes of HOLA or the Financial Institutions Supervisory...

  11. 12 CFR 238.8 - Safe and sound operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 4 2012-01-01 2012-01-01 false Safe and sound operations. 238.8 Section 238.8... (CONTINUED) SAVINGS AND LOAN HOLDING COMPANIES (REGULATION LL) General Provisions § 238.8 Safe and sound... inconsistent with sound banking principles or the purposes of HOLA or the Financial Institutions Supervisory...

  12. SoS Lablet; Perpetually Available and Secure Information Systems

    DTIC Science & Technology

    2015-11-16

    settings, people simply err on the safe side and do a lot less sharing, which explains why all pull -based location sharing applications have failed so...number of data centers is raising concerns about their power consumption. Through an NSF GOALI Bruce Krogh and I have investigated the problem by

  13. 75 FR 50878 - Airworthiness Directives; McDonnell Douglas Corporation Model MD-90-30 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... support fitting for the MLG failing during gear extension and subsequently damaging the hydraulic system... retract cylinder support fitting for the MLG, which could adversely affect the airplane's safe landing... service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services...

  14. 14 CFR 23.775 - Windshields and windows.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... loadings and flight loads, or compliance with the fail-safe requirements of paragraph (d) of this section... loads combined with critical aerodynamic pressure and temperature effects, after failure of any load... in front of the pilots must be arranged so that, assuming the loss of vision through any one panel...

  15. 14 CFR 23.775 - Windshields and windows.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... loadings and flight loads, or compliance with the fail-safe requirements of paragraph (d) of this section... loads combined with critical aerodynamic pressure and temperature effects, after failure of any load... in front of the pilots must be arranged so that, assuming the loss of vision through any one panel...

  16. 14 CFR 23.775 - Windshields and windows.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... loadings and flight loads, or compliance with the fail-safe requirements of paragraph (d) of this section... loads combined with critical aerodynamic pressure and temperature effects, after failure of any load... in front of the pilots must be arranged so that, assuming the loss of vision through any one panel...

  17. 14 CFR 23.775 - Windshields and windows.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... loadings and flight loads, or compliance with the fail-safe requirements of paragraph (d) of this section... loads combined with critical aerodynamic pressure and temperature effects, after failure of any load... in front of the pilots must be arranged so that, assuming the loss of vision through any one panel...

  18. 14 CFR 23.775 - Windshields and windows.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... loadings and flight loads, or compliance with the fail-safe requirements of paragraph (d) of this section... loads combined with critical aerodynamic pressure and temperature effects, after failure of any load... in front of the pilots must be arranged so that, assuming the loss of vision through any one panel...

  19. 42 CFR 71.3 - Designation of yellow fever vaccination centers; Validation stamps.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... safe, potent, and pure yellow fever vaccine. Medical facilities of Federal agencies are authorized to obtain yellow fever vaccine without being designated as a yellow fever vaccination center by the Director..., storage, and administration of yellow fever vaccine. If a designated center fails to comply with such...

  20. Reading between the Lines

    ERIC Educational Resources Information Center

    Waters, John K.

    2009-01-01

    Biometrics has been making its way into school districts for the past decade. Biometric tools draw information from a person's identifying physical components, providing a virtually fail-safe level of protection for K-12 schools. In addition to their security uses, biometric systems are currently used in schools for cafeteria purchases, library…

  1. 49 CFR 385.14 - Motor carriers, brokers, and freight forwarders delinquent in paying civil penalties: prohibition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on transportation. (a) A CMV owner or operator that has failed to pay civil penalties imposed by the FMCSA, or has failed to abide by a payment plan, may be prohibited from operating CMVs in interstate...

  2. 49 CFR 385.14 - Motor carriers, brokers, and freight forwarders delinquent in paying civil penalties: prohibition...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... on transportation. (a) A CMV owner or operator that has failed to pay civil penalties imposed by the FMCSA, or has failed to abide by a payment plan, may be prohibited from operating CMVs in interstate...

  3. 49 CFR 385.14 - Motor carriers, brokers, and freight forwarders delinquent in paying civil penalties: prohibition...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... on transportation. (a) A CMV owner or operator that has failed to pay civil penalties imposed by the FMCSA, or has failed to abide by a payment plan, may be prohibited from operating CMVs in interstate...

  4. 49 CFR 385.14 - Motor carriers, brokers, and freight forwarders delinquent in paying civil penalties: prohibition...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... on transportation. (a) A CMV owner or operator that has failed to pay civil penalties imposed by the FMCSA, or has failed to abide by a payment plan, may be prohibited from operating CMVs in interstate...

  5. 49 CFR 385.14 - Motor carriers, brokers, and freight forwarders delinquent in paying civil penalties: prohibition...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... on transportation. (a) A CMV owner or operator that has failed to pay civil penalties imposed by the FMCSA, or has failed to abide by a payment plan, may be prohibited from operating CMVs in interstate...

  6. Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Jung, Jaewoo; Kopardekar, Parimal H.

    2016-01-01

    Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

  7. Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.; Cavolowsky, John

    2015-01-01

    Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

  8. 25 CFR 30.117 - What happens if a Bureau-funded school fails to make AYP?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What happens if a Bureau-funded school fails to make AYP... fails to make AYP? Number of yrs of failing to make AYP in same academic subject Status Action required by entity operating school for the following school year 1st year of failing AYP No status change...

  9. 25 CFR 30.117 - What happens if a Bureau-funded school fails to make AYP?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false What happens if a Bureau-funded school fails to make AYP... fails to make AYP? Number of yrs of failing to make AYP in same academic subject Status Action required by entity operating school for the following school year 1st year of failing AYP No status change...

  10. Guidance regarding voluntary compliance with international management code for the safe operation of ships and for pollution prevention

    DOT National Transportation Integrated Search

    1994-03-15

    The purpose of this Circular is to advise owners and operators of U.S. flag merchant vessels regarding voluntary compliance with the International Management Code for the Safe Operation of Ships and for Pollution Prevention.

  11. 30 CFR 250.456 - What safe practices must the drilling fluid program follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.456 What safe practices must the drilling fluid program follow... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What safe practices must the drilling fluid...

  12. A Safe Cooperative Framework for Atmospheric Science Missions with Multiple Heterogeneous UAS using Piecewise Bezier Curves

    NASA Technical Reports Server (NTRS)

    Mehdi, S. Bilal; Puig-Navarro, Javier; Choe, Ronald; Cichella, Venanzio; Hovakimyan, Naira; Chandarana, Meghan; Trujillo, Anna; Rothhaar, Paul M.; Tran, Loc; Neilan, James H.; hide

    2016-01-01

    Autonomous operation of UAS holds promise for greater productivity of atmospheric science missions. However, several challenges need to be overcome before such missions can be made autonomous. This paper presents a framework for safe autonomous operations of multiple vehicles, particularly suited for atmospheric science missions. The framework revolves around the use of piecewise Bezier curves for trajectory representation, which in conjunction with path-following and time-coordination algorithms, allows for safe coordinated operations of multiple vehicles.

  13. 78 FR 64423 - Children's Online Privacy Protection Rule Applications for Approval of Proposed Parental Consent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ..., Inc.; Application for Approval of Safe Harbor Program by kidSAFE Seal Program AGENCY: Federal Trade... kidSAFE Seal Program (``kidSAFE''), owned and operated by Samet Privacy, LLC, under the safe harbor... following the instructions on the web-based form. For comments concerning kidSAFE, write ``kidSAFE...

  14. 77 FR 33098 - Hours of Service of Drivers of Commercial Motor Vehicles; Regulatory Guidance for Oilfield Exception

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... their ability to operate the vehicles safely; (3) the physical condition of operators of CMVs is adequate to enable them to operate the vehicles safely and the periodic physical examinations required of such operators are performed by medical examiners who have received training in physical and medical...

  15. 49 CFR 240.125 - Criteria for testing knowledge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... practices for the safe operation of trains. (c) The testing methods selected by the railroad shall be: (1) Designed to examine a person's knowledge of the railroad's rules and practices for the safe operation of...) Personal safety practices; (ii) Operating practices; (iii) Equipment inspection practices; (iv) Train...

  16. Single-Port Onlay Mesh Repair of Recurrent Inguinal Hernias after Failed Anterior and Laparoscopic Repairs

    PubMed Central

    Tran, Kim; Zajkowska, Marta; Lam, Vincent; Hawthorne, Wayne J.

    2015-01-01

    Background and Objectives: Despite the exponential increase in the use of laparoscopic inguinal herniorrhaphy, overall recurrence rates have remained unchanged. Therefore, a growing number of patients are presenting with recurrent hernias after conventional anterior and laparoscopic repairs have failed. This study reports our experience with single-incision laparoscopic (SIL) intraperitoneal onlay mesh (IPOM) repair of these hernias. Methods: Patients referred with two or more recurrences of inguinal hernia underwent SIL-IPOM from November 1, 2009, to June 24, 2014. A 2.5-cm infraumbilical incision was made, and an SIL port was placed intraperitoneally. Modified dissection techniques were used: chopstick and inline dissection, 5.5-mm/52-cm/30° angled laparoscope, and conventional straight dissecting instruments. The peritoneum was incised above the pubic symphysis, and dissection was continued laterally and proximally, raising the inferior flap below the previous extraperitoneal mesh while reducing any direct, indirect, femoral, or cord lipoma before placement of antiadhesive mesh, which was fixed to the pubic ramus, as well as superiorly, with nonabsorbable tacks before the inferior border was fixed with fibrin sealant. The inferior peritoneal flap was then tacked back onto the mesh. Results: Nine male patients underwent SIL-IPOM. Their mean age was 53 years and mean body mass index was 26.8 kg/m2. Mean mesh size was 275 cm2. Mean operation time was 125 minutes, with a hospital stay of 1 day. The umbilical scar length was 23 mm at the 6-week follow-up. There were no intra-/postoperative complications, port-site hernias, chronic groin pain, or recurrence of the hernia during a mean follow-up of 24 months. Conclusion: Inguinal hernias recurring after two or more failed conventional anterior and laparoscopic repairs can be safely and efficiently treated with SIL-IPOM. PMID:25848186

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reynolds, Richard Jennings

    The purpose of this course is to introduce safe hoisting and rigging practices to personnel who are attempting to become LANL incidental crane operators and to review and refresh safe hoisting and rigging practices with existing incidental crane operators.

  18. NextGen Flight Deck Surface Trajectory-Based Operations (STBO): Contingency Holds

    NASA Technical Reports Server (NTRS)

    Bakowski, Deborah Lee; Hooey, Becky Lee; Foyle, David C.; Wolter, Cynthia A.; Cheng, Lara W. S.

    2013-01-01

    The purpose of this pilot-in-the-loop taxi simulation was to investigate a NextGen Surface Trajectory-Based Operations (STBO) concept called "contingency holds." The contingency-hold concept parses a taxi route into segments, allowing an air traffic control (ATC) surface traffic management (STM) system to hold an aircraft when necessary for safety. Under nominal conditions, if the intersection or active runway crossing is clear, the hold is removed, allowing the aircraft to continue taxiing without slowing, thus improving taxi efficiency, while minimizing the excessive brake use, fuel burn, and emissions associated with stop-and-go taxi. However, when a potential traffic conflict exists, the hold remains in place as a fail-safe mechanism. In this departure operations simulation, the taxi clearance included a required time of arrival (RTA) to a specified intersection. The flight deck was equipped with speed-guidance avionics to aid the pilot in safely meeting the RTA. On two trials, the contingency hold was not released, and pilots were required to stop. On two trials the contingency hold was released 15 sec prior to the RTA, and on two trials the contingency hold was released 30 sec prior to the RTA. When the hold remained in place, all pilots complied with the hold. Results also showed that when the hold was released at 15-sec or 30-sec prior to the RTA, the 30-sec release allowed pilots to maintain nominal taxi speed, thus supporting continuous traffic flow; whereas, the 15-sec release did not. The contingency-hold concept, with at least a 30-sec release, allows pilots to improve taxiing efficiency by reducing braking, slowing, and stopping, but still maintains safety in that no pilots "busted" the clearance holds. Overall, the evidence suggests that the contingency-hold concept is a viable concept for optimizing efficiency while maintaining safety.

  19. Rediscovering Interwar American Theorists

    DTIC Science & Technology

    2017-05-25

    society .” See Millis, American Military Thought, xvi. 7 Weigley, The American Way of War: A History of United States Military Strategy and Policy, 214...maintains that Americans failed to perceive the, “operational field as a new and distinct cognition,” until the publication of AirLand Battle doctrine in...developments in operational theory, but values evidence of practice above theory. He contends that Americans failed to benefit from advances in operational

  20. Strategies for Countering Terrorist Safe Havens

    DTIC Science & Technology

    2013-12-01

    tactical containment, pseudo operations, and surrogate security forces. The thesis draws from four historical case studies to examine these strategies...safe havens, tactical containment, pseudo operations, and surrogate security forces. The thesis draws from four historical case studies to examine...pseudo operations—provide viable potential options for USSOF to counter the complex problem of safe havens. Overall, the case studies will demonstrate

  1. [Analysis on influencing factor of the complications of percutaneous dilational tracheotomy].

    PubMed

    Zhai, Xiang; Zhang, Jinling; Hang, Wei; Wang, Ming; Shi, Zhan; Mi, Yue; Hu, Yunlei; Liu, Gang

    2015-01-01

    To Analyze the influence factors on the complications of percutaneous dilational tracheotomy. Between August 2008 and February 2014, there were 3 450 patients with the indications of tracheotomy accepted percutaneous dilational tracheostomy, mainly using percutaneous dilational and percutaneous guide wire forceps in these cases. Statistical analysis was performed by SPSS 19.0 software on postoperative complications, the possible influence factors including age, gender, etiology, preoperative hypoxia, obesity, preoperative pulmonary infection, state of consciousness, operation method, operation doctor and whether with tracheal intubation. Among 3 450 patients, there were 164 cases with intraoperative or postoperative complications, including postoperative bleeding in 74 cases (2.14%), subcutaneous emphysema in 54 cases (1.57%), wound infection in 16 cases (0.46%), pneumothorax in 6 cases (0.17%), mediastinal emphysema in 5 cases (0.14%), operation failed and change to conventional incision in 4 cases (0.12%), tracheoesophageal fistula in 2 cases (0.06%), death in 3 cases(0.09%).Obesity, etiology, preoperative hypoxia, preoperative pulmonary infection, state of consciousness and operation method were the main influence factors, with significant statistical difference (χ(2) value was 0.010, 0.000, 0.002, 0.000, 0.000, 0.000, all P < 0.05). Gender, age, operation doctor and whether there was the endotracheal intubation were not the main influence factors. There was no significant statistical difference (P > 0.05). Although percutaneous dilational tracheostomy is safe, but the complications can also happen. In order to reduce the complications, it is need to pay attention to the factors of obesity, etiology, preoperative hypoxia, preoperative pulmonary infection, state of consciousness and operation method.

  2. CloudSat Anomaly Recovery and Operational Lessons Learned

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona; Vane, Deborah; Livermore, Thomas; Rokey, Mark; Barthuli, Marda; Gravseth, Ian J.; Pieper, Brian; Rodzinak, Aaron; Silva, Steve; Woznick, Paul; hide

    2012-01-01

    In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.

  3. End-to-End Demonstrator of the Safe Affordable Fission Engine (SAFE) 30: Power Conversion and Ion Engine Operation

    NASA Technical Reports Server (NTRS)

    Hrbud, Ivana; VanDyke, Melissa; Houts, Mike; Goodfellow, Keith; Schafer, Charles (Technical Monitor)

    2001-01-01

    The Safe Affordable Fission Engine (SAFE) test series addresses Phase 1 Space Fission Systems issues in particular non-nuclear testing and system integration issues leading to the testing and non-nuclear demonstration of a 400-kW fully integrated flight unit. The first part of the SAFE 30 test series demonstrated operation of the simulated nuclear core and heat pipe system. Experimental data acquired in a number of different test scenarios will validate existing computational models, demonstrated system flexibility (fast start-ups, multiple start-ups/shut downs), simulate predictable failure modes and operating environments. The objective of the second part is to demonstrate an integrated propulsion system consisting of a core, conversion system and a thruster where the system converts thermal heat into jet power. This end-to-end system demonstration sets a precedent for ground testing of nuclear electric propulsion systems. The paper describes the SAFE 30 end-to-end system demonstration and its subsystems.

  4. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, STS-103 Mission Specialist Steven L. Smith (right) and other members of the crew look over new Multi-Layer Insulation (MLI) intended for the Hubble Space Telescope. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with the MLI. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  5. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    During a Crew Equipment Interface Test, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly look at a replacement computer for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility. Other members of the crew are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with the new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  6. Hubble (HST) hardware arrives at KSC for servicing mission, STS-103

    NASA Technical Reports Server (NTRS)

    1999-01-01

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is transferred onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review.

  7. KSC-99pp1092

    NASA Image and Video Library

    1999-09-02

    During a Crew Equipment Interface Test, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly look at a replacement computer for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility. Other members of the crew are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with the new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  8. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  9. STS-103 crew take part in CEIT in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out a portable foot restraint on the Flight Support System that will be used on the mission, repairing the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  10. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, members of the STS-103 crew get instructions on use of rib clamps for the Shield Shell Replacement Fabric (SSRF) task on repair of the Hubble Space Telescope. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  11. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, members of the STS-103 crew look at some of the equipment to be used during their mission. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  12. KSC-99pp1098

    NASA Image and Video Library

    1999-09-02

    During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out a portable foot restraint on the Flight Support System that will be used on the mission, repairing the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  13. KSC-99pp1089

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, members of the STS-103 crew look at some of the equipment to be used during their mission. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  14. KSC-99pp1086

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  15. KSC-99pp1088

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, members of the STS-103 crew get instructions on use of rib clamps for the Shield Shell Replacement Fabric (SSRF) task on repair of the Hubble Space Telescope. The seven-member crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  16. Experimental Evidence for Diagramming Benefits in Science Writing

    ERIC Educational Resources Information Center

    Barstow, Brendan; Fazio, Lisa; Schunn, Christian; Ashley, Kevin

    2017-01-01

    Arguing for the need for a scientific research study (i.e. writing an introduction to a research paper) poses significant challenges for students. When faced with these challenges, students often generate overly safe replications (i.e. fail to find and include opposition to their hypothesis) or in contrast include no strong support for their…

  17. Power-Factor Controllers: How Safe?

    NASA Technical Reports Server (NTRS)

    Long, K.; Christian, W.; Kovacik, J.; Grazyk, T.

    1985-01-01

    Potential safety problems with power-factor controllers (PFC's) evaluated. Based on study of PFCs in use with appliances, report recommends measures to prevent consumers from misapplying these energy saving devices. Device used on such appliances as refrigerators, sewing machines, pumps, hair dryers, and food processors. When misused, they fail to save energy and may cause damage.

  18. 24 CFR 884.219 - Overcrowded and underoccupied units.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... assisted under this part is not Decent, Safe, and Sanitary by reason of increase in Family size, or that a Contract unit is larger than appropriate for the size of the Family in occupancy, housing assistance payments with respect to such unit will not be abated, unless the Owner fails to offer the Family a...

  19. Establishment of design criteria for acceptable failure modes and fail safe considerations for the space shuttle structural system

    NASA Technical Reports Server (NTRS)

    Westrup, R. W.

    1971-01-01

    The application of general design approaches for preventing failures due to repeated load cycles is briefly discussed. Program objective, mission requirements, and structural design criteria are summarized. Discrete structural elements and associated sections were selected for detailed strength, fatigue, and fracture mechanics investigations.

  20. Filter holder assembly having extended collar spacer ring

    DOEpatents

    Alvin, Mary Anne; Bruck, Gerald J.

    2002-01-01

    A filter holder assembly is provided that utilizes a fail-safe regenerator unit with an annular spacer ring having an extended metal collar for containment and positioning of a compliant ceramic gasket used in the assembly. The filter holder assembly is disclosed for use with advanced composite, filament wound, and metal candle filters.

  1. Keeping Schools Safe during Tight Budget Times

    ERIC Educational Resources Information Center

    Trump, Kenneth S.

    2010-01-01

    Tight budgets are no excuse for failing to be proactive with school safety. In fact, school leaders must be especially committed to prevention and security programs during times when economic woes are increasing stress on kids, their families and school staff. Parents will forgive educators if their school's test scores drop. But they are much…

  2. The Fail-Safe Micro Research Paper.

    ERIC Educational Resources Information Center

    Saunders, Mary Anne

    A key element in a research paper writing assignment modified for students of English as a second language to assure their success is teacher control over most of the process. A chronological plan for action for the micro research project includes these steps: creating an awareness of current events and controversial issues, practicing necessary…

  3. Accountable Game Design: Structuring the Dynamics of Student Learning Interactions

    ERIC Educational Resources Information Center

    Charoenying, Timothy

    2010-01-01

    Game-based classroom activity is intended to leverage students' interest and motivation to play, and to provide safe contexts for supporting students' academic learning. However, a basic criticism of many games currently used in classroom settings is that they can fail to meaningfully embody academic content. A more subtle concern is that…

  4. Management of complex pediatric laryngotracheal stenosis with skin graft reconstruction.

    PubMed

    Bowe, Sarah N; Wentland, Carissa J; Sandhu, G S; Hartnick, Christopher J

    2018-05-01

    For pediatric patients with laryngotracheal stenosis, the ultimate goal is creation of a safe, functional airway. Unfortunately, wound healing in a hollow structure can complicate repair attempts, leading to restenosis. Herein, we present our experience using skin-grafting techniques in two complex pediatric laryngotracheal stenosis cases, leading to successful decannulation or speech production. A chart review was performed examining the evaluation and management of two pediatric patients with laryngotracheal stenosis despite prior reconstructive attempts. Patient history, bronchoscopic evaluation, intra-operative technique, post-operative management, treatment outcomes, and complications were noted. Harvesting and preparation of the split-thickness skin grafts (STSG) proceeded in a similar manner for each case. Stenting material varied based on the clinical scenario. Using this technique, our patient with a Type 3 glottic web achieved substantial improvement in exercise tolerance, as well as vocal strength and quality. In addition, our aphonic patient could vocalize for the first time since her laryngotracheal injury. Temporary endoluminal stenting with skin graft lining can reproduce epithelial continuity and provide "biological inhibition" to enhance the wound healing process. When previous reconstructive efforts have failed, use of STSG can be considered in the management of complex pediatric laryngotracheal stenosis. Copyright © 2018. Published by Elsevier B.V.

  5. An astrometric facility for planetary detection on the space station

    NASA Technical Reports Server (NTRS)

    Nishioka, Kenji; Scargle, Jeffrey D.; Givens, John J.

    1987-01-01

    An Astrometric Telescope Facility (ATF) for planetary detection is being studied as a potential space station initial operating capability payload. The primary science objective of this mission is the detection and study of planetary systems around other stars. In addition, the facility will be capable of other astrometric measurements such as stellar motions of other galaxies and highly precise direct measurement of stellar distance within the Milky Way Galaxy. The results of a recently completed ATF preliminary systems definition study are summarized. Results of this study indicate that the preliminary concept for the facility is fully capable of meeting the science objective without the development of any new technologies. A simple straightforward operations approach was developed for the ATF. A real-time facility control is not normally required, but does maintain a near real-time ground monitoring capability for the facility and science data stream on a full-time basis. Facility observational sequences are normally loaded once a week. In addition, the preliminary system is designed to be fail-safe and single-fault tolerant. Routine interactions by the space station crew with the ATF will not be necessary, but onboard controls are provided for crew override as required for emergencies and maintenance.

  6. Beam Loss Monitoring for LHC Machine Protection

    NASA Astrophysics Data System (ADS)

    Holzer, Eva Barbara; Dehning, Bernd; Effnger, Ewald; Emery, Jonathan; Grishin, Viatcheslav; Hajdu, Csaba; Jackson, Stephen; Kurfuerst, Christoph; Marsili, Aurelien; Misiowiec, Marek; Nagel, Markus; Busto, Eduardo Nebot Del; Nordt, Annika; Roderick, Chris; Sapinski, Mariusz; Zamantzas, Christos

    The energy stored in the nominal LHC beams is two times 362 MJ, 100 times the energy of the Tevatron. As little as 1 mJ/cm3 deposited energy quenches a magnet at 7 TeV and 1 J/cm3 causes magnet damage. The beam dumps are the only places to safely dispose of this beam. One of the key systems for machine protection is the beam loss monitoring (BLM) system. About 3600 ionization chambers are installed at likely or critical loss locations around the LHC ring. The losses are integrated in 12 time intervals ranging from 40 μs to 84 s and compared to threshold values defined in 32 energy ranges. A beam abort is requested when potentially dangerous losses are detected or when any of the numerous internal system validation tests fails. In addition, loss data are used for machine set-up and operational verifications. The collimation system for example uses the loss data for set-up and regular performance verification. Commissioning and operational experience of the BLM are presented: The machine protection functionality of the BLM system has been fully reliable; the LHC availability has not been compromised by false beam aborts.

  7. Active Fail-Safe Micro-Array Flow Control for Advanced Embedded Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Mace, James L.; Mani, Mori

    2009-01-01

    The primary objective of this research effort was to develop and analytically demonstrate enhanced first generation active "fail-safe" hybrid flow-control techniques to simultaneously manage the boundary layer on the vehicle fore-body and to control the secondary flow generated within modern serpentine or embedded inlet S-duct configurations. The enhanced first-generation technique focused on both micro-vanes and micro-ramps highly-integrated with micro -jets to provide nonlinear augmentation for the "strength' or effectiveness of highly-integrated flow control systems. The study focused on the micro -jet mass flow ratio (Wjet/Waip) range from 0.10 to 0.30 percent and jet total pressure ratios (Pjet/Po) from 1.0 to 3.0. The engine bleed airflow range under study represents about a 10 fold decrease in micro -jet airflow than previously required. Therefore, by pre-conditioning, or injecting a very small amount of high-pressure jet flow into the vortex generated by the micro-vane and/or micro-ramp, active flow control is achieved and substantial augmentation of the controlling flow is realized.

  8. Flow Structures and Interactions of a Fail-Safe Actuator

    NASA Astrophysics Data System (ADS)

    Khan, Wasif; Elimelech, Yoseph; Amitay, Michael

    2010-11-01

    Vortex generators are passive devices that are commonly used in many aerodynamic applications. In their basic concept, they enhance mixing, reduce or mitigate flow separation; however, they cause drag penalties at off design conditions. Micro vanes implement the same basic idea of vortex generators but their physical dimensions are much smaller. To achieve the same effect on the baseline flow field, micro vanes are combined with an active flow control device, so their net effect is comparable to that of vortex generators when the active device is energized. As a result of their small size, micro vanes have significantly less drag penalty at off design conditions. This concept of "dual-action" is the reason why such actuation is commonly called hybrid or fail-safe actuation. The present study explores experimentally the flow interaction of a synthetic-jet with a micro vane in a zero pressure gradient flow over a flat plate. Using the stereo particle image velocimetry technique a parametric study was conducted, where the effects of the micro vane shape, height and its angle with respect to the flow were examined, at several blowing ratios and synthetic-jet configurations.

  9. Folic acid and sulfasalazine for colorectal carcinoma chemoprevention in patients with ulcerative colitis: the old and new evidence.

    PubMed

    Diculescu, Mircea; Ciocîrlan, Mihai; Ciocîrlan, Mirela; Piţigoi, Dan; Becheanu, Gabriel; Croitoru, Adina; Spanache, Sandu

    2003-12-01

    The purpose of the study was to assess whether folic acid supplementation and long term therapy with sulfasalazine can reduce the risk of colorectal cancer (CRC) development in longstanding extensive ulcerative colitis. A meta-analysis was performed including the last 10 years published and Medline indexed studies on this subject. 3 studies have been included concerning the protective effect of folate supplementation in development of CRC. The association of these two factors is significant (effect size r =0.124, p = 0.025). The fail-safe number of studies with an opposite result should be 4 to revert the significance. 4 studies regarding sulfasalazine's protective effect in longstanding extensive ulcerative colitis have also been evaluated. A similar significance has been obtained, r = 0.148, p = 0.0007 and a fail-safe number of studies equal to 7. The homogeneity of these studies is validated by standard tests. Both sulfasalazine therapy and folate supplementation have a protective effect in colorectal cancer development in a population of patients with longstanding ulcerative colitis. Randomized controlled trials are needed to explore these hypotheses.

  10. Automated Transfer Vehicle Proximity Flight Safety Overview

    NASA Astrophysics Data System (ADS)

    Cornier, Dominique; Berthelier, David; Requiston, Helene; Zekri, Eric; Chase, Richard

    2005-12-01

    The European Automated Transfer Vehicle (ATV) is an unmanned transportation spacecraft designed to contribute to the logistic servicing of the ISS. The ATV will be launched by ARIANE 5 and, after phasing and rendezvous maneuvers, it autonomously docks to the International Space Station (ISS).The ATV control is nominally handled by the Guidance, Navigation and Control (GNC) function using computers, software, sensors and actuators. During rendezvous operations, in order to cover the extreme situations where the GNC function fails to ensure a safe trajectory with respect to the ISS, a segregated Proximity Flight Safety (PFS) function is activated : this function will initiate a collision avoidance maneuver which will place the ATV on a trajectory ensuring safety with respect to the ISS. The PFS function relies on segregated computers, the Monitoring and Safing Units (MSUs) running specific software, on four dedicated thrusters, on dedicated batteries and on specific interfaces with ATV gyrometers.The PFS function being the ultimate protection to ensure ISS safety in case of ATV malfunction, specific rules have been applied to its implementation, in particular for the development of the MSU software, which is critical since any failure of this software may result in catastrophic consequences.This paper provides an overview of the ATV Proximity Flight Safety function. After a short description of the overall ATV avionics architecture and its rationale, the second part of the paper presents more details on the PFS function both in terms of hardware and software implementation. The third part of the paper is dedicated to the MSU software validation method that is specific considering its criticality. The last part of the paper provides information on the different operations related to the use of the PFS function during an ATV flight.

  11. Estimation of safe exposure time from an ophthalmic operating microscope with regard to ultraviolet radiation and blue-light hazards to the eye

    NASA Astrophysics Data System (ADS)

    Michael, Ralph; Wegener, Alfred

    2004-08-01

    Hazards from the optical radiation of an operating microscope that cause damage at the corneal, lenticular, and retinal levels were investigated; we considered, in particular, ultraviolet radiation (UVR) and blue light. The spectral irradiance from a Zeiss operation microscope OPMI VISU 200 was measured in the corneal plane between 300 and 1100 nm. Effective irradiance and radiance were calculated with relative spectral effectiveness data from the American Conference for Governmental and Industrial Hygienists. Safe exposure time to avoid UVR injury to the lens and cornea was found to be 2 h without a filter, 4 h with a UVR filter, 200 h with a yellow filter, and 400 h with a filter combination. Safe exposure time to avoid retinal photochemical injury was found to be 3 min without a filter and with a UVR filter, 10 min with a yellow filter, and 49 min with a filter combination. The effective radiance limit for retinal thermal injury was not exceeded. The hazard due to the UVR component from the operating microscope is not critical, and operation time can be safely prolonged with the use of appropriate filters. The retinal photochemical hazard appears critical without appropriate filters, permitting only some minutes of safe exposure time. The calculated safe exposure times are for worst-case conditions and maximal light output and include a safety factor.

  12. Estimation of safe exposure time from an ophthalmic operating microscope with regard to ultraviolet radiation and blue-light hazards to the eye.

    PubMed

    Michael, Ralph; Wegener, Alfred

    2004-08-01

    Hazards from the optical radiation of an operating microscope that cause damage at the corneal, lenticular, and retinal levels were investigated; we considered, in particular, ultraviolet radiation (UVR) and blue light. The spectral irradiance from a Zeiss operation microscope OPMI VISU 200 was measured in the corneal plane between 300 and 1100 nm. Effective irradiance and radiance were calculated with relative spectral effectiveness data from the American Conference for Governmental and Industrial Hygienists. Safe exposure time to avoid UVR injury to the lens and cornea was found to be 2 h without a filter, 4 h with a UVR filter, 200 a yellow filter, and 400 h with a filter combination. Safe exposure time to avoid retinal photochemical injury was found to be 3 min without a filter and with a UVR filter, 10 min with a yellow filter, and 49 min with a filter combination. The effective radiance limit for retinal thermal injury was not exceeded. The hazard due to the UVR component from the operating microscope is not critical, and operation time can be safely prolonged with the use of appropriate filters. The retinal photochemical hazard appears critical without appropriate filters, permitting only some minutes of safe exposure time. The calculated safe exposure times are for worst-case conditions and maximal light output and include a safety factor.

  13. Agricultural Safety. FMO: Fundamentals of Machine Operation. Second Edition.

    ERIC Educational Resources Information Center

    John Deere Co., Moline, IL.

    This manual is intended to provide students with basic information on the safe operation of farm machinery. The following topics are covered in the individual chapters: safe farm machinery operation (the importance of safety, the role of communication in safety, and types of farm accidents); human factors (human limitations and capabilities;…

  14. 49 CFR 199.103 - Use of persons who fail or refuse a drug test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.103 Use of persons who fail or refuse a drug test. (a) An operator may not knowingly use as an employee any person who— (1) Fails a drug test required by... 49 Transportation 3 2013-10-01 2013-10-01 false Use of persons who fail or refuse a drug test. 199...

  15. 49 CFR 199.103 - Use of persons who fail or refuse a drug test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.103 Use of persons who fail or refuse a drug test. (a) An operator may not knowingly use as an employee any person who— (1) Fails a drug test required by... 49 Transportation 3 2014-10-01 2014-10-01 false Use of persons who fail or refuse a drug test. 199...

  16. 49 CFR 199.103 - Use of persons who fail or refuse a drug test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.103 Use of persons who fail or refuse a drug test. (a) An operator may not knowingly use as an employee any person who— (1) Fails a drug test required by... 49 Transportation 3 2011-10-01 2011-10-01 false Use of persons who fail or refuse a drug test. 199...

  17. 49 CFR 199.103 - Use of persons who fail or refuse a drug test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.103 Use of persons who fail or refuse a drug test. (a) An operator may not knowingly use as an employee any person who— (1) Fails a drug test required by... 49 Transportation 3 2012-10-01 2012-10-01 false Use of persons who fail or refuse a drug test. 199...

  18. 49 CFR 199.103 - Use of persons who fail or refuse a drug test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.103 Use of persons who fail or refuse a drug test. (a) An operator may not knowingly use as an employee any person who— (1) Fails a drug test required by... 49 Transportation 3 2010-10-01 2010-10-01 false Use of persons who fail or refuse a drug test. 199...

  19. Surgical treatment of chronic pancreatitis--a 14 years experience.

    PubMed

    Stroescu, C; Dima, S; Scarlat, A; Ivanov, B; Bouaru, O; Ionescu, M; Vasilescu, C; Popescu, I

    2010-01-01

    Operative treatment of chronic pancreatitis is indicated for patients with intractable pain after failed medical and endoscopic treatment, or in the presence of complications of the disease. This study evaluates a single-center experience with operative management of chronic pancreatitis over a period of time of 14 years, regarding indication, surgical technique, early and late results. The records of 265 consecutive patients who underwent surgery for chronic pancreatitis between 1995 and 2008 were retrospectively reviewed and analyzed. Long-term outcomes were assessed by patient survey, with a median follow-up of 40 months. 265 patients underwent 275 operations for chronic pancreatitis with the main indication abdominal pain (46.8%), followed by suspected malignancy in 24.8% and recurrent episodes of acute pancreatitis in 18.6%. Resection procedures 54.5% (150), drainage procedures 1.09% (3), bypass and denervation procedures 44.36% (122) and exploratory laparotomy 3.27% (9) were performed with an overall morbidity of 22% and an in-hospital mortality rate of 2.64%. After a median follow-up of 40 months survival information was available for 137 patients (51.69%) with a 5-and actuarial survival rate of 74.7% and quality of life improvement in most patients, especially in the resected group. Our results suggest that in chronic pancreatitis the type of surgery has to be individualized in each patient (resection VS drainage) and organ preserving operations are safe and effective in providing long-term pain relief and in treating CP-related complications

  20. APOLLO COMMAND MODULE (CM) - SAFE TOUCHDOWN - PACIFIC OCEAN

    NASA Image and Video Library

    1971-08-07

    S71-41999 (7 Aug. 1971) --- The Apollo 15 Command Module (CM), with astronauts David R. Scott, commander; Alfred M. Worden, command module pilot; and James B. Irwin, lunar module pilot, aboard, nears a safe touchdown in the mid-Pacific Ocean to conclude a highly successful lunar landing mission. Although causing no harm to the crewmen, one of the three main parachutes failed to function properly. The splashdown occurred at 3:45:53 p.m. (CDT), Aug. 7, 1971, some 330 miles north of Honolulu, Hawaii. The three astronauts were picked up by helicopter and flown to the prime recovery ship USS Okinawa, which was only 6 1/2 miles away.

  1. Pre-flight risk assessment in emergency medical service (EMS) helicopters

    NASA Technical Reports Server (NTRS)

    Shively, Robert J.

    1990-01-01

    A preflight risk assessment system (SAFE) was developed at NASA-Ames Research Center for civil EMS operations to assist pilots in making a decision objectively to accept or decline a mission. The ability of the SAFE system to predict risk profiles was examined at an EMS operator. Results of this field study showed that the usefulness of SAFE was largely dependent on the type of mission flown.

  2. Fail-safe transcription termination: Because one is never enough

    PubMed Central

    Lemay, Jean-François; Bachand, François

    2015-01-01

    Termination of RNA polymerase II (RNAPII) transcription is a fundamental step of gene expression that involves the release of the nascent transcript and dissociation of RNAPII from the DNA template. As transcription termination is intimately linked to RNA 3′ end processing, termination pathways have a key decisive influence on the fate of the transcribed RNA. Quite remarkably, when reaching the 3′ end of genes, a substantial fraction of RNAPII fail to terminate transcription, requiring the contribution of alternative or “fail-safe” mechanisms of termination to release the polymerase. This point of view covers redundant mechanisms of transcription termination and how they relate to conventional termination models. In particular, we expand on recent findings that propose a reverse torpedo model of termination, in which the 3′5′ exonucleolytic activity of the RNA exosome targets transcription events associated with paused and backtracked RNAPII. PMID:26273910

  3. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond line of sight.

  4. The Presence of the Correlates of Effective Schools at the District Level: A Case Study

    ERIC Educational Resources Information Center

    Thompson, DeNelle

    2013-01-01

    Although the No Child Left Behind Act (NCLB) requires all American public schools to meet Adequate Yearly Progress (AYP), many fail to meet this standard each year. Effective Schools Research has revealed several correlates, such as a clear mission, a safe climate, strong instructional leadership, monitoring of student progress, strong…

  5. 28 CFR 90.106 - What are the grantee reporting requirements for the grant program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) VIOLENCE AGAINST WOMEN Grants To Combat Violent Crimes Against Women on Campuses § 90.106 What..., Violence Against Women Office). Funding shall be suspended if a grantee fails to submit an annual..., Violence Against Women Office) and the Secretary of Education (U.S. Department of Education's Safe and Drug...

  6. Is the cervical spine clear? Undetected cervical fractures diagnosed only at autopsy.

    PubMed

    Sweeney, J F; Rosemurgy, A S; Gill, S; Albrink, M H

    1992-10-01

    Undetected cervical-spine injuries are a nemesis to both trauma surgeons and emergency physicians. Radiographic protocols have been developed to avoid missing cervical-spine fractures but are not fail-safe. Three case reports of occult cervical fractures documented at autopsy in the face of normal cervical-spine radiographs and computerized tomography scans are presented.

  7. 76 FR 28226 - Ndahendekire Barbara v. African Shipping; Njoroge Muhia; Alco Logistics, Llc; Brenda Alexander...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... international cargo shipping; Respondent Njoroge Muhia is Chief Executive Officer for African Shipping... containers and chassis to Mombasa Kenya, violated Section 10(d)(1) of the Shipping Act, 46 U.S.C. 41102(c), by ``failing to ensure that Ms. Barbara[`s] (sic) container was delivered safely, securely and on...

  8. A Matter of Money? Policy Analysis of Rural Boarding Schools in China

    ERIC Educational Resources Information Center

    Zhao, Zhenzhou

    2011-01-01

    The Chinese government has shifted the pattern of rural schooling over the past decade, replacing village schools with urban boarding schools. The stated goal is to improve school quality, while deploying resources more effectively. However, the new boarding schools fail to provide a safe, healthy environment or protect and enable students' human…

  9. Battery Control Algorithms | Transportation Research | NREL

    Science.gov Websites

    publications. Accounting for Lithium-Ion Battery Degradation in Electric Vehicle Charging Optimization Advanced Reformulation of Lithium-Ion Battery Models for Enabling Electric Transportation Fail-Safe Design for Large Capacity Lithium-Ion Battery Systems Contact Ying Shi Email | 303-275-4240

  10. Preparation of Simulated LBL Defects for Round Robin Experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerczak, Tyler J.; Baldwin, Charles A.; Hunn, John D.

    2016-01-01

    A critical characteristic of the TRISO fuel design is its ability to retain fission products. During reactor operation, the TRISO layers act as barriers to release of fission products not stabilized in the kernel. Each component of the TRISO particle and compact construction plays a unique role in retaining select fission products, and layer performance is often interrelated. The IPyC, SiC, and OPyC layers are barriers to the release of fission product gases such as Kr and Xe. The SiC layer provides the primary barrier to release of metallic fission products not retained in the kernel, as transport across themore » SiC layer is rate limiting due to the greater permeability of the IPyC and OPyC layers to many metallic fission products. These attributes allow intact TRISO coatings to successfully retain most fission products released from the kernel, with the majority of released fission products during operation being due to defective, damaged, or failed coatings. This dominant release of fission products from compromised particles contributes to the overall source term in reactor; causing safety and maintenance concerns and limiting the lifetime of the fuel. Under these considerations, an understanding of the nature and frequency of compromised particles is an important part of predicting the expected fission product release and ensuring safe and efficient operation.« less

  11. Analysis on the Role of RSG-GAS Pool Cooling System during Partial Loss of Heat Sink Accident

    NASA Astrophysics Data System (ADS)

    Susyadi; Endiah, P. H.; Sukmanto, D.; Andi, S. E.; Syaiful, B.; Hendro, T.; Geni, R. S.

    2018-02-01

    RSG-GAS is a 30 MW reactor that is mostly used for radioisotope production and experimental activities. Recently, it is regularly operated at half of its capacity for efficiency reason. During an accident, especially loss of heat sink, the role of its pool cooling system is very important to dump decay heat. An analysis using single failure approach and partial modeling of RELAP5 performed by S. Dibyo, 2010 shows that there is no significant increase in the coolant temperature if this system is properly functioned. However lessons learned from the Fukushima accident revealed that an accident can happen due to multiple failures. Considering ageing of the reactor, in this research the role of pool cooling system is to be investigated for a partial loss of heat sink accident which is at the same time the protection system fails to scram the reactor when being operated at 15 MW. The purpose is to clarify the transient characteristics and the final state of the coolant temperature. The method used is by simulating the system in RELAP5 code. Calculation results shows the pool cooling systems reduce coolant temperature for about 1 K as compared without activating them. The result alsoreveals that when the reactor is being operated at half of its rated power, it is still in safe condition for a partial loss of heat sink accident without scram.

  12. Implementing extended observing at the JCMT

    NASA Astrophysics Data System (ADS)

    Walther, Craig; Dempsey, Jessica; Campbell, Ian

    2014-08-01

    The James Clerk Maxwell Telescope (JCMT) is the largest single dish submillimetre telescope in the world. Recently the Joint Astronomy Centre (JAC) has learned that the JCMT will no longer receive financial support from its original supporting agencies after September 2014. There is significant pressure to complete some surveys that have been in progress at the JCMT for many years now. With the goal of completing a higher percentage of these surveys it was decided to take advantage of the hours between when the telescope operator leaves the telescope and when the day crew arrives. These hours generally have reasonable seeing and low column integrated water vapor, so they are good for observing. This observing is being performed remotely, in Hilo, without staff at the telescope, by staff members who do not have telescope operation as part of their job descriptions. This paper describes the hardware changes necessary to implement remote observing at JCMT. It also describes the software needed for remote, fail safe, operation of the telescope. The protocols and rules for passing the control of the telescope between the various groups are discussed. Since these Extended Operators are not expert telescope operators, the system was simplified as much as possible, but some training was necessary and proper checklists are essential. Due to the success of the first phase of Extending Observing at the JCMT, the hours when the weather is good and no one is at the telescope, but no day crew is on the way, are also now being utilized. Extended Observing has already yielded a considerable amount of science observing time.

  13. Lunar Surface Operations with Dual Rovers

    NASA Technical Reports Server (NTRS)

    Horz, Friedrich; Lofgren, Gary E.; Eppler, Dean E.; Ming, Douglas

    2010-01-01

    Lunar Electric Rovers (LER) are currently being developed that are substantially more capable than the Apollo vehicle (LRN ,"). Unlike the LRV, the new LERs provide a pressurized cabin that serves as short-sleeve environment for the crew of two, including sleeping accommodations and other provisions that allow for long tern stays, possibly up to 60 days, on the hear surface, without the need to replenish consumables from some outside source, such as a lander or outpost. As a consequence, significantly larger regions may be explored in the future and traverse distances may be measured in a few hundred kilometers (1, 2). However, crew safety remains an overriding concern, and methods other than "walk back", the major operational constraint of all Apollo traverses, must be implemented to assure -at any time- the safe return of the crew to the lander or outpost. This then causes current Constellation plans to envision long-tern traverses to be conducted with 2 LERs exclusively, each carrying a crew of two: in case one rover fails, the other will rescue the stranded crew and return all 4 astronauts in a single LER to base camp. Recent Desert Research and Technology Studies (DRATS) analog field tests simulated a continuous 14 day traverse (3), covering some 135 km, and included a rescue operation that transferred the crew and diverse consumables from one LER to another these successful tests add substantial realism to the development of long-term, dual rover operations. The simultaneous utilization of 2 LERs is of course totally unlike Apollo and raises interesting issues regarding science productivity and mission operations, the thrust of this note.

  14. 49 CFR 392.62 - Safe operation, buses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS DRIVING OF COMMERCIAL MOTOR VEHICLES Prohibited Practices § 392.62 Safe operation, buses. No person shall drive a bus and a motor...

  15. Safety and IVHM

    NASA Technical Reports Server (NTRS)

    Goebel, Kai

    2012-01-01

    When we address safety in a book on the business case for IVHM, the question arises whether safety isn t inherently in conflict with the need of operators to run their systems as efficiently (and as cost effectively) as possible. The answer may be that the system needs to be just as safe as needed, but not significantly more. That begs the next question: How safe is safe enough? Several regulatory bodies provide guidelines for operational safety, but irrespective of that, operators do not want their systems to be known as lacking safety. We illuminate the role of safety within the context of IVHM.

  16. Analog front-end design of the STS/MUCH-XYTER2—full size prototype ASIC for the CBM experiment

    NASA Astrophysics Data System (ADS)

    Kleczek, Rafal

    2017-01-01

    The design of the analog front-end of the STS/MUCH-XYTER2 ASIC, a full-size prototype chip for the Silicon Tracking System (STS, based on double-sided silicon strip sensors) and Muon Chamber (MUCH, based on gas sensors) detectors is presented. The ASIC contains 128 charge processing channels, each built of a charge sensitive amplifier, a polarity selection circuit and two pulse shaping amplifiers forming two parallel signal paths. The first path is used for timing measurement with a fast discriminator. The second path allows low-noise amplitude measurement with a 5-bit continuous-time flash ADC. Different operating conditions and constraints posed by two target detectors' applications require front-end electronics flexibility to meet extended system-wise requirements. The presented circuit implements switchable shaper peaking time, gain switching and trimming, input amplifier pulsed reset circuit, fail-safe measures. The power consumption is scalable (for the STS and the MUCH modes), but limited to 10 mW/channel.

  17. Consideration of Moving Tooth Load in Gear Crack Propagation Predictions

    NASA Technical Reports Server (NTRS)

    Lewicki, David G.; Handschuh, Robert F.; Spievak, Lisa E.; Wawrzynek, Paul A.; Ingraffea, Anthony R.

    2001-01-01

    Robust gear designs consider not only crack initiation, but crack propagation trajectories for a fail-safe design. In actual gear operation, the magnitude as well as the position of the force changes as the gear rotates through the mesh. A study to determine the effect of moving gear tooth load on crack propagation predictions was performed. Two-dimensional analysis of an involute spur gear and three-dimensional analysis of a spiral-bevel pinion gear using the finite element method and boundary element method were studied and compared to experiments. A modified theory for predicting gear crack propagation paths based on the criteria of Erdogan and Sih was investigated. Crack simulation based on calculated stress intensity factors and mixed mode crack angle prediction techniques using a simple static analysis in which the tooth load was located at the highest point of single tooth contact was validated. For three-dimensional analysis, however, the analysis was valid only as long as the crack did not approach the contact region on the tooth.

  18. Robust nonlinear system identification: Bayesian mixture of experts using the t-distribution

    NASA Astrophysics Data System (ADS)

    Baldacchino, Tara; Worden, Keith; Rowson, Jennifer

    2017-02-01

    A novel variational Bayesian mixture of experts model for robust regression of bifurcating and piece-wise continuous processes is introduced. The mixture of experts model is a powerful model which probabilistically splits the input space allowing different models to operate in the separate regions. However, current methods have no fail-safe against outliers. In this paper, a robust mixture of experts model is proposed which consists of Student-t mixture models at the gates and Student-t distributed experts, trained via Bayesian inference. The Student-t distribution has heavier tails than the Gaussian distribution, and so it is more robust to outliers, noise and non-normality in the data. Using both simulated data and real data obtained from the Z24 bridge this robust mixture of experts performs better than its Gaussian counterpart when outliers are present. In particular, it provides robustness to outliers in two forms: unbiased parameter regression models, and robustness to overfitting/complex models.

  19. Acoustic Detection of Faults and Degradation in a High-Bypass Turbofan Engine during VIPR Phase III Testing

    NASA Technical Reports Server (NTRS)

    Boyle, Devin K.

    2017-01-01

    The Vehicle Integrated Propulsion Research (VIPR) Phase III project was executed at Edwards Air Force Base, California, by the National Aeronautics and Space Administration and several industry, academic, and government partners in the summer of 2015. One of the research objectives was to use external radial acoustic microphone arrays to detect changes in the noise characteristics produced by the research engine during volcanic ash ingestion and seeded fault insertion scenarios involving bleed air valves. Preliminary results indicate the successful acoustic detection of suspected degradation as a result of cumulative exposure to volcanic ash. This detection is shown through progressive changes, particularly in the high-frequency content, as a function of exposure to greater cumulative quantities of ash. Additionally, detection of the simulated failure of the 14th stage stability bleed valve and, to a lesser extent, the station 2.5 stability bleed valve, to their fully-open fail-safe positions was achieved by means of spectral comparisons between nominal (normal valve operation) and seeded fault scenarios.

  20. An Indirect Adaptive Control Scheme in the Presence of Actuator and Sensor Failures

    NASA Technical Reports Server (NTRS)

    Sun, Joy Z.; Josh, Suresh M.

    2009-01-01

    The problem of controlling a system in the presence of unknown actuator and sensor faults is addressed. The system is assumed to have groups of actuators, and groups of sensors, with each group consisting of multiple redundant similar actuators or sensors. The types of actuator faults considered consist of unknown actuators stuck in unknown positions, as well as reduced actuator effectiveness. The sensor faults considered include unknown biases and outages. The approach employed for fault detection and estimation consists of a bank of Kalman filters based on multiple models, and subsequent control reconfiguration to mitigate the effect of biases caused by failed components as well as to obtain stability and satisfactory performance using the remaining actuators and sensors. Conditions for fault identifiability are presented, and the adaptive scheme is applied to an aircraft flight control example in the presence of actuator failures. Simulation results demonstrate that the method can rapidly and accurately detect faults and estimate the fault values, thus enabling safe operation and acceptable performance in spite of failures.

  1. Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seletskiy, S.; Amundsen, C.; Ha, K.

    2015-04-02

    The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

  2. Process Time Refinement for Reusable Launch Vehicle Regeneration Modeling

    DTIC Science & Technology

    2008-03-01

    predicted to fail, or have failed. 3) Augmenting existing space systems with redundant or additional capability to enhance space system performance or...Canopies, External Tanks/Pods/Pylon Ejectors , Armament Bay Doors, Missile Launchers, Wing and Fuselage Center Line Racks, Bomb Bay Release...Systems Test 04583 Thrust Maintenance Operation 04584 Silo Door Operation 04650 Initial Build-up-Recovery Vehicle (RV) 147 04610 Nondestructive

  3. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond visual line of sight (BVLOS).

  4. The popliteus tendon provides a safe and reliable location for all-inside meniscal repair device placement.

    PubMed

    Ouanezar, Hervé; Blakeney, William G; Latrobe, Charles; Saithna, Adnan; Fernandes, Levi Reina; Delaloye, Jean Romain; Thaunat, Mathieu; Sonnery-Cottet, Bertrand

    2018-03-03

    Repairs of the posterior horn of the lateral meniscus can be technically challenging. In contrast to medial meniscus repairs, the capsule around the posterior segment attachment of the lateral meniscus is quite thin. This study evaluates the clinical results of an arthroscopic all-inside repair technique for unstable, vertical, lateral meniscus tears, using a suture repair placed directly into the popliteus tendon. A retrospective analysis of prospectively collected data from the SANTI database was performed. All patients who had undergone combined ACL reconstruction with lateral meniscus all-inside repair, using sutures placed in the popliteus tendon, between 2011 and 2015, were included. Patients were reviewed clinically at 1 and 2 years' follow-up. At final follow-up, all patients were contacted to identify if they underwent further surgery or had knee pain, locking or effusion. Symptomatic patients were recalled for clinical evaluation by a physician and Magnetic Resonance Imaging of the knee. Operative notes for those undergoing further surgery were reviewed and rates and type of re-operation, including for failed lateral meniscal repair were recorded. Two hundred patients (mean age 28.6 ± 10.2 years) with a mean follow-up of 45.5 ± 12.8 months (range 24.7-75.2) were included. The mean Subjective International Knee Documentation Committee (IKDC) at final follow-up was 85.0 ± 11.3. The post-operative mean side-to-side laxity measured at 1 year was 0.6 ± 1.0 mm. Twenty-six patients underwent re-operation (13%) at a mean follow-up of 14.8 ± 7.8 months. The ACL graft rupture rate was 5.0%. Other causes for re-operation included medial meniscus tear (2.5%), cyclops lesion (1.5%) and septic arthritis (0.5%). The lateral meniscus repair failure rate was 3.5%. No specific complications relating to placement of sutures in the popliteus tendon were identified. Arthroscopic all-inside repair of unstable, vertical, lateral meniscus tears using a suture placed in the popliteus tendon is a safe technique. It is associated with a very low failure rate with no specific complications. Level IV.

  5. Malpractice liability, technology choice and negative defensive medicine.

    PubMed

    Feess, Eberhard

    2012-04-01

    We extend the theoretical literature on the impact of malpractice liability by allowing for two treatment technologies, a safe and a risky one. The safe technology bears no failure risk, but leads to patient-specific disutility since it cannot completely solve the health problems. By contrast, the risky technology (for instance a surgery) may entirely cure patients, but fail with some probability depending on the hospital's care level. Tight malpractice liability increases care levels if the risky technology is chosen at all, but also leads to excessively high incentives for avoiding the liability exposure by adopting the safe technology. We refer to this distortion toward the safe technology as negative defensive medicine. Taking the problem of negative defensive medicine seriously, the second best optimal liability needs to balance between the over-incentive for the safe technology in case of tough liability and the incentive to adopt little care for the risky technology in case of weak liability. In a model with errors in court, we find that gross negligence where hospitals are held liable only for very low care levels outperforms standard negligence, even though standard negligence would implement the first best efficient care level.

  6. Thoracoscopic bilateral T3 sympathectomy for primary focal hyperhidrosis in children.

    PubMed

    Laje, Pablo; Rhodes, Kali; Magee, Leanne; Klarich, Mary Kate

    2017-02-01

    Present our experience in the surgical treatment of primary focal hyperhidrosis of the hands by thoracoscopic bilateral T3 sympathectomy in pediatric patients. Retrospective chart review of all patients operated between 2013 and 2015. We operated and included in the study 28 patients, 22 females and 6 males. Mean age was 14 (6-21) years. All patients had previously tried at least one form of medical therapy with no success. All patients were extensively counseled regarding the potential side effects of the sympathectomy. The operations were done in supine position with the arms extended. All patients were intubated with a double-lumen endotracheal tube for sequential lung isolation. We used a 5-mm port for the scope and a 3-mm port for the instruments, both placed in the axilla. The third rib was identified by fluoroscopy. The sympathectomy was done with monopolar cautery. Mean operative time was 43 (25-71) minutes. No chest tubes were used. The incidence of intraoperative or postoperative complications was zero. All patients were discharged within the first 24 postoperative hours. All patients achieved immediate complete postoperative resolution of the palmar hyperhidrosis, sustained in all cases at a median follow-up of 17 (2-34) months. The mean preoperative quality of life score (based on a multifunctional self-assessment questionnaire) was 41/100, whereas after the operation, it was 92/100. Only 1 patient developed temporary compensatory sweating. All patients were satisfied with the result of the operation. Thoracoscopic bilateral T3 sympathectomy is a safe and effective treatment for children and adolescents with primary focal hyperhidrosis of the hands who failed medical management and have a very low rate of compensatory sweating. IV. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Solar Photovoltaic DC Systems: Basics and Safety: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McNutt, Peter F; Sekulic, William R; Dreifuerst, Gary

    Solar Photovoltaic (PV) systems are common and growing with 42.4 GW installed capacity in U.S. (almost 15 GW added in 2016). This paper will help electrical workers, and emergency responders understand the basic operating principles and hazards of PV DC arrays. We briefly discuss the following aspects of solar photovoltaic (PV) DC systems: the effects of solar radiation and temperature on output power; PV module testing standards; common system configurations; a simple PV array sizing example; NEC guidelines and other safety features; DC array commissioning, periodic maintenance and testing; arc-flash hazard potential; how electrical workers and emergency responders can andmore » do work safely around PV arrays; do moonlight and artificial lighting pose a real danger; typical safe operating procedures; and other potential DC-system hazards to be aware of. We also present some statistics on PV DC array electrical incidents and injuries. Safe PV array operation is possible with a good understanding of PV DC arrays basics and having good safe operating procedures in place.« less

  8. Fracture control methods for space vehicles. Volume 1: Fracture control design methods. [for space shuttle configuration planning

    NASA Technical Reports Server (NTRS)

    Liu, A. F.

    1974-01-01

    A systematic approach for applying methods for fracture control in the structural components of space vehicles consists of four major steps. The first step is to define the primary load-carrying structural elements and the type of load, environment, and design stress levels acting upon them. The second step is to identify the potential fracture-critical parts by means of a selection logic flow diagram. The third step is to evaluate the safe-life and fail-safe capabilities of the specified part. The last step in the sequence is to apply the control procedures that will prevent damage to the fracture-critical parts. The fracture control methods discussed include fatigue design and analysis methods, methods for preventing crack-like defects, fracture mechanics analysis methods, and nondestructive evaluation methods. An example problem is presented for evaluation of the safe-crack-growth capability of the space shuttle crew compartment skin structure.

  9. Reactive, Safe Navigation for Lunar and Planetary Robots

    NASA Technical Reports Server (NTRS)

    Utz, Hans; Ruland, Thomas

    2008-01-01

    When humans return to the moon, Astronauts will be accompanied by robotic helpers. Enabling robots to safely operate near astronauts on the lunar surface has the potential to significantly improve the efficiency of crew surface operations. Safely operating robots in close proximity to astronauts on the lunar surface requires reactive obstacle avoidance capabilities not available on existing planetary robots. In this paper we present work on safe, reactive navigation using a stereo based high-speed terrain analysis and obstacle avoidance system. Advances in the design of the algorithms allow it to run terrain analysis and obstacle avoidance algorithms at full frame rate (30Hz) on off the shelf hardware. The results of this analysis are fed into a fast, reactive path selection module, enforcing the safety of the chosen actions. The key components of the system are discussed and test results are presented.

  10. 26 CFR 1.121-3 - Reduced maximum exclusion for taxpayers failing to meet certain requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... by reason of a change in place of employment, health, or unforeseen circumstances. If a safe harbor described in this section applies, a sale or exchange is deemed to be by reason of a change in place of... sale or exchange is by reason of a change in place of employment, health, or unforeseen circumstances...

  11. 26 CFR 1.121-3 - Reduced maximum exclusion for taxpayers failing to meet certain requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... by reason of a change in place of employment, health, or unforeseen circumstances. If a safe harbor described in this section applies, a sale or exchange is deemed to be by reason of a change in place of... sale or exchange is by reason of a change in place of employment, health, or unforeseen circumstances...

  12. 26 CFR 1.121-3 - Reduced maximum exclusion for taxpayers failing to meet certain requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... by reason of a change in place of employment, health, or unforeseen circumstances. If a safe harbor described in this section applies, a sale or exchange is deemed to be by reason of a change in place of... sale or exchange is by reason of a change in place of employment, health, or unforeseen circumstances...

  13. 26 CFR 1.121-3 - Reduced maximum exclusion for taxpayers failing to meet certain requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... by reason of a change in place of employment, health, or unforeseen circumstances. If a safe harbor described in this section applies, a sale or exchange is deemed to be by reason of a change in place of... sale or exchange is by reason of a change in place of employment, health, or unforeseen circumstances...

  14. Toward A Fail-Safe Air Force Culture: Creating a Resilient Future While Avoiding Past Mistakes

    DTIC Science & Technology

    2012-10-01

    process often uses the “ Swiss cheese ” model to evaluate accidents. The image of holes in the protective cheese layers (proactive and reactive measures...minimize the number and size of holes in each slice of cheese . More importantly, however, a HRO’s 16 focus is on “the process of the slices lining up as

  15. Getting Comfortable with Failure and Vulnerability to Facilitate Learning and Innovation in the Game of School

    ERIC Educational Resources Information Center

    Machajewski, Szymon

    2017-01-01

    Schools are to prepare students for success. However, they often villainize failure. Instead, schools should teach students how to fail fast and safely in order to learn and to allow innovation through vulnerability. The lessons that the gaming culture has for learning will define future strategies of teaching and learning. Games are sometimes…

  16. 26 CFR 1.121-3 - Reduced maximum exclusion for taxpayers failing to meet certain requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... by reason of a change in place of employment, health, or unforeseen circumstances. If a safe harbor described in this section applies, a sale or exchange is deemed to be by reason of a change in place of... sale or exchange is by reason of a change in place of employment, health, or unforeseen circumstances...

  17. Securing Cyberspace: Approaches to Developing an Effective Cyber-Security Strategy

    DTIC Science & Technology

    2011-05-15

    attackers, cyber - criminals or even teenage hackers. Protecting cyberspace is a national security priority. President Obama’s National Security...prefers to engage international law enforcement to investigate and catch cyber criminals .40 International cooperation could resolve jurisdictional...sheltered them. Similarly, a state that fails to prosecute cyber - criminals , or who gives safe haven to individuals or groups that conduct cyber-attacks

  18. Snowmobiling in the 1980's: continued progress for a mature recreational activity

    Treesearch

    William T., Jr. Jobe

    1980-01-01

    In less than two decades, snowmobiling has changed from a novelty to a way of life for some 20,000,000 Canadian and American citizens of all ages. Why has snowmobiling continued to mushroom? Why did the challenges of inadequate safe use areas, public criticism and skepticism and primitive machines fail to doom the activity to a passing fad?

  19. Failing Safely: Increasing Theology and Religious Studies Students' Resilience and Academic Confidence via Risk-Taking in Formative Assessment

    ERIC Educational Resources Information Center

    Cornwall, Susannah

    2018-01-01

    Students increasingly appear anxious, risk-averse, and worried about getting things "wrong." They may appear to lack intellectual curiosity, and be unwilling to engage in independent study. This essay explores how teaching and assessment in theology and religious studies might help students learn to take intellectual risks, and increase…

  20. Electronic switches and control circuits: A compilation

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The innovations in this updated series of compilations dealing with electronic technology represents a carefully selected collection of items on electronic switches and control circuits. Most of the items are based on well-known circuit design concepts that have been simplified or refined to meet NASA's demanding requirement for reliability, simplicity, fail-safe characteristics, and the capability of withstanding environmental extremes.

  1. Fail-Safe System against Potential Tumorigenicity after Transplantation of iPSC Derivatives.

    PubMed

    Itakura, Go; Kawabata, Soya; Ando, Miki; Nishiyama, Yuichiro; Sugai, Keiko; Ozaki, Masahiro; Iida, Tsuyoshi; Ookubo, Toshiki; Kojima, Kota; Kashiwagi, Rei; Yasutake, Kaori; Nakauchi, Hiromitsu; Miyoshi, Hiroyuki; Nagoshi, Narihito; Kohyama, Jun; Iwanami, Akio; Matsumoto, Morio; Nakamura, Masaya; Okano, Hideyuki

    2017-03-14

    Human induced pluripotent stem cells (iPSCs) are promising in regenerative medicine. However, the risks of teratoma formation and the overgrowth of the transplanted cells continue to be major hurdles that must be overcome. Here, we examined the efficacy of the inducible caspase-9 (iCaspase9) gene as a fail-safe against undesired tumorigenic transformation of iPSC-derived somatic cells. We used a lentiviral vector to transduce iCaspase9 into two iPSC lines and assessed its efficacy in vitro and in vivo. In vitro, the iCaspase9 system induced apoptosis in approximately 95% of both iPSCs and iPSC-derived neural stem/progenitor cells (iPSC-NS/PCs). To determine in vivo function, we transplanted iPSC-NS/PCs into the injured spinal cord of NOD/SCID mice. All transplanted cells whose mass effect was hindering motor function recovery were ablated upon transduction of iCaspase9. Our results suggest that the iCaspase9 system may serve as an important countermeasure against post-transplantation adverse events in stem cell transplant therapies. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  2. Comparison of three humidifiers during high-frequency percussive ventilation using the VDR-4® Fail-safe Breathing Circuit Hub.

    PubMed

    Tiffin, Norman H; Short, Kathy A; Jones, Samuel W; Cairns, Bruce A

    2011-01-01

    The VDR-4® high-frequency percussive ventilator (HFPV) has been shown to be beneficial in the management of inhalation injury by improving secretion clearance while maintaining oxygenation and ventilation. Delivery of gas flow during HFPV could lack adequate humidification delivered to the patient because a major portion of the delivered gas flow would bypass the humidifier when using the original VDR-4® ventilator circuit. The authors tested a novel inline vaporizing humidifier and two gas-water interface humidifiers during HFPV using the new VDR-4® Fail-safe Breathing Circuit Hub® to determine whether delivered humidification could be improved. This new humidification system, the Hydrate Omni™, delivers water vapor into the gas flow of the ventilator circuit rather than water droplets as delivered by the gas-water interface humidifiers. Measurements of absolute humidity and gas temperature were made on the three different humidification systems using a test lung model under standard ambient conditions. The authors found that when using the novel inline vaporizer, it provided better humidification when compared with the standard gas-water interface humidifier during HFPV using the new VDR-4® breathing circuit.

  3. The Safe Zone Range for Cup Anteversion Is Narrower Than for Inclination in THA.

    PubMed

    Murphy, William S; Yun, Ho Hyun; Hayden, Brett; Kowal, Jens H; Murphy, Stephen B

    2018-02-01

    Cup malposition is a common cause of impingement, limitation of ROM, acceleration of bearing wear, liner fracture, and instability in THA. Previous studies of the safe zone based on plain radiographs have limitations inherent to measuring angles from two-dimensional projections. The current study uses CT to measure component position in stable and unstable hips to assess the presence of a safe zone for cup position in THA. (1) Does acetabular component orientation, when measured on CT, differ in stable components and those revised for recurrent instability? (2) Do CT data support historic safe zone definitions for component orientation in THA? We identified 34 hips that had undergone revision of the acetabulum for recurrent instability that also had a CT scan of the pelvis between August 2003 and February 2017. We also identified 175 patients with stable hip replacements who also had a CT study for preoperative planning and intraoperative navigation of the contralateral side. For each CT study, one observer analyzed major factors including acetabular orientation, femoral anteversion, combined anteversion (the sum of femoral and anatomic anteversion), pelvic tilt, total offset difference, head diameter, age, sex, and body mass index. These measures were then compared among stable hips, hips with cup revision for anterior instability, and hips with cup revision for posterior instability. We used a clinically relevant measurement of operative anteversion and inclination as opposed to the historic use of radiographic anteversion and inclination. The percentage of unstable hips in the historic Lewinnek safe zone was calculated, and a new safe zone was proposed based on an area with no unstable hips. Anteriorly unstable hips compared with stable hips had higher operative anteversion of the cup (44° ± 12° versus 31° ± 11°, respectively; mean difference, 13°; 95% confidence interval [CI], 5°-21°; p = 0.003), tilt-adjusted operative anteversion of the cup (40° ± 6° versus 26° ± 10°, respectively; mean difference, 14°; 95% CI, 10°-18°; p < 0.001), and combined tilt-adjusted anteversion of the cup (64° ± 10° versus 54° ± 19°, respectively; mean difference, 10°; 95% CI, 1°-19°; p = 0.028). Posteriorly unstable hips compared with stable hips had lower operative anteversion of the cup (19° ± 15° versus 31° ± 11°, respectively; mean difference, -12°; 95% CI, -5° to -18°; p = 0.001), tilt-adjusted operative anteversion of the cup (19° ± 13° versus 26° ± 10°, respectively; mean difference, -8°; 95% CI, -14° to -2°; p = 0.014), pelvic tilt (0° ± 6° versus 4° ± 6°, respectively; mean difference, -4°; 95% CI, -7° to -1°; p = 0.007), and anatomic cup anteversion (25° ± 18° versus 34° ± 12°, respectively; mean difference, -9°; 95% CI, -1° to -17°; p = 0.033). Thirty-two percent of the unstable hips were located in the Lewinnek safe zone (11 of 34; 10 posterior dislocations, one anterior dislocation). In addition, a safe zone with no unstable hips was identified within 43° ± 12° of operative inclination and 31° ± 8° of tilt-adjusted operative anteversion. The current study supports the notion of a safe zone for acetabular component orientation based on CT. However, the results demonstrate that the historic Lewinnek safe zone is not a reliable predictor of future stability. Analysis of tilt-adjusted operative anteversion and operative inclination demonstrates a new safe zone where no hips were revised for recurrent instability that is narrower for tilt-adjusted operative anteversion than for operative inclination. Tilt-adjusted operative anteversion is significantly different between stable and unstable hips, and surgeons should therefore prioritize assessment of preoperative pelvic tilt and accurate placement in operative anteversion. With improvements in patient-specific cup orientation goals and acetabular component placement, further refinement of a safe zone with CT data may reduce the incidence of cup malposition and its associated complications. Level III, diagnostic study.

  4. 76 FR 9853 - Parts and Accessories Necessary for Safe Operation; Brakes; Application for Exemption From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Innovative Electronics; Correction AGENCY: Federal Motor Carrier Safety Administration (FMCSA), DOT. ACTION... Accessories Necessary for Safe Operation; Brakes; Application for Exemption From Innovative Electronics... Innovative Electronics; Notice of application for exemption; request for comments (76 FR 7623, February 10...

  5. Operational and Medical Procedures for a Declared Contingency Shuttle (CSCS) Shuttle Mission Due to a Failure that Precludes a Safe Return

    NASA Technical Reports Server (NTRS)

    Adams, Adrien; Patlach, Bob; Duchense, Ted; Chandler, Mike; Stepaniak, Philip C.

    2011-01-01

    This poster paper outlines the operational and medical procedures for a shuttle mission that has a failure that precludes a safe return to Earth. Information about the assumptions, procedures and limiting consumables is included.

  6. Managing Cassini Safe Mode Attitude at Saturn

    NASA Technical Reports Server (NTRS)

    Burk, Thomas A.

    2010-01-01

    The Cassini spacecraft was launched on October 15, 1997 and arrived at Saturn on June 30, 2004. It has performed detailed observations and remote sensing of Saturn, its rings, and its satellites since that time. In the event safe mode interrupts normal orbital operations, Cassini has flight software fault protection algorithms to detect, isolate, and recover to a thermally safe and commandable attitude and then wait for further instructions from the ground. But the Saturn environment is complex, and safety hazards change depending on where Cassini is in its orbital trajectory around Saturn. Selecting an appropriate safe mode attitude that insures safe operation in the Saturn environment, including keeping the star tracker field of view clear of bright bodies, while maintaining a quiescent, commandable attitude, is a significant challenge. This paper discusses the Cassini safe table management strategy and the key criteria that must be considered, especially during low altitude flybys of Titan, in deciding what spacecraft attitude should be used in the event of safe mode.

  7. STS-103 crew take part in CEIT in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the Flight Support System (FSS)from above and below. The FSS is part of the primary payload on the mission to repair the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  8. Arthrodesis of the knee with intramedullary nail fixation.

    PubMed

    Puranen, J; Kortelainen, P; Jalovaara, P

    1990-03-01

    Thirty-three patients had an arthrodesis of the knee by means of an intramedullary nail introduced through the greater trochanter. Fifteen of the procedures were done for a failed knee arthroplasty; eight had failed because of infection and seven, because of aseptic loosening. Twenty-nine of the thirty-three knees united three to four months after the first attempt at arthrodesis and three united after technical errors were corrected. One knee had a broken nail and a non-union; this was still untreated at the time of writing. Four nails broke: three in the line of fusion and one in the line of an infected supracondylar pseudarthrosis of the femur. No new infections developed after the arthrodesis. Three patients had had an infection and a chronic fistula before the arthrodesis, and the fistulae healed six, fourteen, and eighteen months postoperatively. In another patient, who had had infection and necrosis of the skin preoperatively, the wound healed in six months. All of these knees healed without an additional major operation. The functional result was satisfactory in all patients. After the arthrodesis, seventeen of the thirty-three patients needed less aid when walking, and no patient needed more aid. Fusion of the knee with a long intramedullary nail can be safe and effective, even in the presence of infection, if the revision is performed properly and certain technical principles are followed. It is especially important to establish good contact between the resected bones.

  9. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, a member of the STS-103 crew checks out rib clamp to be used on the Shield Shell Replacement Fabric (SSRF) task on repair of the Hubble Space Telescope. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  10. KSC-99pp1099

    NASA Image and Video Library

    1999-09-03

    During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out tools to be used on planned Extravehicular Activities (EVAs) on the mission for repair of the Hubble Space Telescope. In uniform, from left, are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), Claude Nicollier of Switzerland, and John M. Grunsfeld (Ph.D.). Other crew members at KSC for the CEIT are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  11. STS-103 crew take part in CEIT in the orbiter Discovery

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the mid-deck of the orbiter Discovery, STS-103 crew Commander Curtis L. Brown Jr. and Pilot Scott J. Kelly check out part of the equipment to be flown on the mission, the repair and upgrade of the Hubble Space Telescope. They are at KSC taking part in a Crew Equipment Interface Test along with other crew members Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Fran'''ois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  12. STS-103 crew take part in CEIT in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, four STS-103 crew members check the Flight Support System avionics to be used for repair and upgrade of the Hubble Space Telescope. The crew are at KSC to take part in a Crew Equipment Interface Test. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  13. [Work accidents and automatic circuit reclosers in the electricity sector: beyond the immediate causes].

    PubMed

    Silva, Alessandro Jose Nunes da; Almeida, Ildeberto Muniz de; Vilela, Rodolfo Andrade de Gouveia; Mendes, Renata Wey Berti; Hurtado, Sandra Lorena Beltran

    2018-05-10

    The Brazilian electricity sector has recorded high work-related mortality rates that have been associated with outsourcing, used to cut costs. In order to decrease the power outage time for consumers, the industry adopted the automatic circuit recloser as the technical solution. The device has hazardous implications for maintenance workers. The aim of this study was to analyze the origins and consequences of work accidents in power systems with automatic circuit recloser, using the Accident Analysis and Prevention (AAP) model. The AAP model was used to investigate two work accidents, aimed to explore the events' organizational origins. Case 1 - when changing a deenergized secondary line, a worker received a shock from the energized primary cable (13.8kV). The system reclosed three times, causing severe injury to the worker (amputation of a lower limb). Case 2 - a fatal work accident occurred during installation of a new crosshead on a partially insulated energized line. The tip of a metal cross arm section strap touched the energized secondary line and electrocuted the maintenance operator. The circuit breaker component of the automatic circuit recloser failed. The analyses revealed how business management logic can participate in the root causes of work accidents through failures in maintenance management, outsourced workforce management, and especially safety management in systems with reclosers. Decisions to adopt automation to guarantee power distribution should not overlook the risks to workers in overhead power lines or fail to acknowledge the importance of ensuring safe conditions.

  14. KSC-99pp1100

    NASA Image and Video Library

    1999-09-03

    In the Orbiter Processing Facility (OPF) bay 1, STS-103 Commander Curtis L. Brown Jr. sits in the command seat of the orbiter Discovery, inspecting the window. Brown and other crew members are at KSC to take part in a Crew Equipment Interface Test. The rest of the crew are Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  15. Holocamera for 3-D micrography of the alert human eye

    NASA Astrophysics Data System (ADS)

    Tokuda, A. R.; Auth, D. C.; Bruckner, A. P.

    1980-07-01

    A holocamera that safely records holograms of the full depth of the alert human eye with a spatial resolution of about 20 microns is described. A single-mode argon-ion laser generating 2 W at 5145 A serves as the illuminating source. Holographic exposure times of 0.3 msec are achieved by means of a fail-safe electromechanical shutter system. Integrated retinal irradiance levels are well under the American National Standards Institute safety standards. Reconstructed real images are projected directly onto the vidicon faceplate of a closed-circuit TV system, enabling convenient scanning in the x-y-z dimensions of the reconstructed eyeball. Serially reconstructed holograms of cataractous rabbit eyes and normal human eyes are presented.

  16. Safe and rapid resolution of severe hypertriglyceridaemia in two patients with intravenous insulin.

    PubMed

    Triay, J M; Day, A; Singhal, P

    2010-09-01

    To rapidly reduce serum triglyceride to a safe serum level. Severe hypertriglyceridaemia is associated with uncontrolled diabetes, obesity and poor physical activity. Even moderate increases in triglyceride levels (> 5mmol/L) confer an increased risk of pancreatitis and coronary artery disease. We present two patients with diabetes and serum triglyceride levels of greater than 85mmol/L despite polypharmacy intervention. 72-hour intravenous insulin infusion was administered. Serum triglyceride levels fell to 9.4 and 4.6 mmol/L respectively, without adverse events and sustained effect over several months. We suggest the use of intravenous insulin infusion where lifestyle and oral drug therapies have failed can impact on severe hypertriglyceridaemia.

  17. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  18. 46 CFR 69.121 - Engine room deduction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... necessary for the safe operation and maintenance of the propelling machinery, the entire space, or, if... machinery space is not bulkheaded off or is larger than necessary for the safe operation and maintenance of... room deduction is either a percentage of the vessel's total propelling machinery spaces or a percentage...

  19. A safe operating space for humanity

    Treesearch

    Johan Rockström; Will Steffen; Kevin Noone; Asa Persson; F. Stuart Chapin; Eric F. Lambin; Timothy M. Lenton; Marten Scheffer; Carl Folke; Hans Joachim Schellnhuber; Björn Nykvist; Cynthia A. de Wit; Terry Hughes; Sander van der Leeuw; Henning Rodhe; Sverker Sörlin; Peter K. Snyder; Robert Costanza; Uno Svedin; Malin Falkenmark; Louise Karlberg; Robert W. Corell; Victoria J. Fabry; James Hansen; Brian Walker; Diana Liverman; Katherine Richardson; Paul Crutzen; Jonathan A. Foley

    2009-01-01

    To meet the challenge of maintaining the Holocene state, we propose a framework based on 'planetary boundaries'. These boundaries define the safe operating space for humanity with respect to the Earth system and are associated with the planet's biophysical subsystems or processes. Although Earth's complex systems sometimes respond smoothly to...

  20. 30 CFR 250.199 - Paperwork Reduction Act statements-information collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be safe and protect the human, marine, and coastal environment, and will result in diligent..., marine, and coastal environment. (5) Subpart E, Oil and Gas Well-Completion Operations (1010-0067) To... that well-completion operations are safe and protect the human, marine, and coastal environment. (6...

  1. (abstract) The Design of a Benign Fail-safe Mechanism Using a Low-melting-point Metal Alloy Coupler

    NASA Technical Reports Server (NTRS)

    Blomquist, Richard S.

    1995-01-01

    Because the alpha proton X ray spectrometer (APXS) sensor head on the Mars Pathfinder rover, Sojourner, is placed on Martian soil by the deployment mechanism (ADM), the rover would be crippled if the actuator fails when the mechanism is in its deployed position, as rover ground clearance is then reduced to zero. This paper describes the unique fail-safe mounted on the ADM, especially the use of a low-temperature-melting alloy as a coupler device. The final form of the design is a low-melting-point metal pellet coupler, made from Cerrobend, in parallel with a Negator spring pack. In its solid state, the metal rigidly connects the driver (the actuator) and the driven part (the mechanism). When commanded, a strip heater wrapped around the coupler melts the metal pellet (at 60(deg)C), allowing the driven part to turn independent of the driver. The Negator spring retracts the mechanism to its fully stowed position. This concept meets all the design criteria, and provides an added benefit. When the metal hardens the coupler once again rigidly connects the actuator and the mechanism. The concept presented here can easily be applied to other applications. Anywhere release devices are needed, low-melting-point couplers can be considered. The issues to be concerned with are thermal isolation, proper setting of the parts before actuation, and possible outgassing concerns. However, when these issues are overcome, the resulting release mechanism can promise to be the most light, simple, power conserving alternative available.

  2. Unmanned Aerial System (UAS) Traffic Management (UTM): Enabling Low-Altitude Airspace and UAS Operations

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2014-01-01

    Many civilian applications of Unmanned Aerial Systems (UAS) have been imagined ranging from remote to congested urban areas, including goods delivery, infrastructure surveillance, agricultural support, and medical services delivery. Further, these UAS will have different equipage and capabilities based on considerations such as affordability, and mission needs applications. Such heterogeneous UAS mix, along with operations such as general aviation, helicopters, gliders must be safely accommodated at lower altitudes. However, key infrastructure to enable and safely manage widespread use of low-altitude airspace and UAS operations therein does not exist. Therefore, NASA is exploring functional design, concept and technology development, and a prototype UAS Traffic Management (UTM) system. UTM will support safe and efficient UAS operations for the delivery of goods and services

  3. Salvage reconstruction of failed interposition arthroplasty at the base of the thumb.

    PubMed

    Braun, Richard M; Rechnic, Mark; Shah, Kalpit N

    2012-12-01

    We present an operative procedure designed to revise a failed arthroplasty at the base of the thumb. This report describes a reliable operation that corrects residual instability and malignment which results in thumbs that are weak and painful despite a previous procedure. The operation has also been used as a primary procedure for arthritis of the trapeziometacarpal joint where instability and subluxation was a major component of the problem requiring joint reconstruction. The unique features of this procedure include a reinforced double-thickness tendon graft, a unique tendon anchor, and a fascia lata allograft spacer. Significant functional improvement is anticipated when joint reconstruction provides increased proximal stability. Pinch and grip measurements improve. Pain scores also diminish after the operation. Hand function and patient satisfaction can be substantially improved with revision arthroplasty when the initial operation has failed to provide a thumb that is mobile, stable, and pain free. The technical features of the procedure address reduction of malignment, restoring of anatomic balance, and secure fixation of the proximal apex of the thumb metacarpal which restores thumb reduction position and digital balance.

  4. Self-teaching digital-computer program for fail-operational control of a turbojet engine in a sea-level test stand

    NASA Technical Reports Server (NTRS)

    Wallhagen, R. E.; Arpasi, D. J.

    1974-01-01

    The design and evaluation are described of a digital turbojet engine control which is capable of sensing catastrophic failures in either the engine rotor speed or the compressor discharge static-pressure signal and is capable of switching control modes to maintain near normal operation. The control program was developed for and tested on a turbojet engine located in a sea-level test stand. The control program is also capable of acquiring all the data that are necessary for the fail-operational control to function.

  5. Preparation of pre-cut corneas from fresh donated whole globes for Descemet's stripping automated keratoplasty: 3-year results at the Central Eye Bank of Iran.

    PubMed

    Kanavi, Mozhgan Rezaei; Javadi, Mohammad Ali; Javadi, Fatemeh; Chamani, Tahereh

    2014-09-01

    To describe the technique and the results of the preparation of pre-cut corneas for Descemet's stripping automated endothelial keratoplasty (DSAEK) during a 3-year period at the Central Eye Bank of Iran (CEBI). The method of preparation of pre-cut corneas from donated whole globes at the CEBI is described and the frequency and percentage of pre-cut corneas prepared for DSAEK, between April 2009 and March 2012, are specified. Moreover, post-operative reports are reviewed for any complaints about using pre-cut tissues for DSAEK. Out of the 1,518 donated whole globes appropriate for DSAEK, 1,478 (97.4 %) pre-cut corneas were successfully prepared. The method of preparation failed in 40 (2.6 %) cases. Based on the eye bank post-operative reports, thickness of pre-cut tissues for DSAEK was deemed unacceptable in only 6 (0.4 %) cases prior to surgery; five of these were too thick and one was too thin. Preparation of pre-cut corneas, for DSAEK from donated whole globes, in the CEBI is a safe and easy method, with very good preservation of endothelial cells after the preparation of the pre-cut corneas and reduced risks from corneal manipulation.

  6. Electro-chemical arsenic remediation: field trials in West Bengal.

    PubMed

    Amrose, Susan E; Bandaru, Siva R S; Delaire, Caroline; van Genuchten, Case M; Dutta, Amit; DebSarkar, Anupam; Orr, Christopher; Roy, Joyashree; Das, Abhijit; Gadgil, Ashok J

    2014-08-01

    Millions of people in rural South Asia are exposed to high levels of arsenic through groundwater used for drinking. Many deployed arsenic remediation technologies quickly fail because they are not maintained, repaired, accepted, or affordable. It is therefore imperative that arsenic remediation technologies be evaluated for their ability to perform within a sustainable and scalable business model that addresses these challenges. We present field trial results of a 600 L Electro-Chemical Arsenic Remediation (ECAR) reactor operating over 3.5 months in West Bengal. These results are evaluated through the lens of a community scale micro-utility business model as a potential sustainable and scalable safe water solution for rural communities in South Asia. We demonstrate ECAR's ability to consistently reduce arsenic concentrations of ~266 μg/L to <5 μg/L in real groundwater, simultaneously meeting the international standards for iron and aluminum in drinking water. ECAR operating costs (amortized capital plus consumables) are estimated as $0.83-$1.04/m(3) under realistic conditions. We discuss the implications of these results against the constraints of a sustainable and scalable business model to argue that ECAR is a promising technology to help provide a clean water solution in arsenic-affected areas of South Asia. Copyright © 2013 Elsevier B.V. All rights reserved.

  7. Epinephrine-induced pulmonary edema during hip arthroscopy: a report of two cases and a review of the literature.

    PubMed

    Belkin, Nicole S; Degen, Ryan M; Liguori, Gregory A; Kelly, Bryan T

    2017-09-01

    Hip arthroscopy utilization has significantly increased in recent years. While it is a relatively safe procedure, it is not without risk. Life-threatening complications, albeit rare, can potentially occur and must be appropriately recognized and treated. We describe 2 cases in which patients' undergoing hip arthroscopy developed pulmonary edema and their respective courses of treatment. Both patients were being treated for symptomatic femoroacetabular impingement (FAI), with labral tears, requiring operative management after a failed trial of conservative management. The complication occurred during a primary hip arthroscopy procedure and a retrospective review of their clinical records and intra-operative notes was performed. Hip arthroscopy was performed under spinal anesthetic in the supine position in both patients. In both procedures, patients developed severe hypertension and tachycardia, with subsequent oxygen desaturations with noted pulmonary edema. The postulated etiology was systemic effects from intra-articular epinephrine, causing acute pulmonary edema with corresponding cardiovascular changes. With supportive ventilation, selective alpha-adrenergic blocker and furosemide administration, and cessation of epinephrine exposure, vital signs normalized and both patients experienced symptom resolution. During arthroscopy, if acute hypertension, tachycardia and hypoxia develop, epinephrine-induced pulmonary edema should be considered as a cause by the treating orthopedic surgeon and anesthesiologist in order to initiate an appropriate treatment plan.

  8. Aeromedical waiver status in U.S. Naval aviators involved in Class A mishaps.

    PubMed

    Weber, David K

    2002-08-01

    U.S. Naval aviators are subject to stringent aeromedical standards. Aeromedic waivers are considered when a naval aviator develops a medical condition that is deemed safe for flight, allowing that aviator to continue in a flying status. No Class A (serious) mishap to date has been directly attributable to an aviator's waivered condition. However, to date no study has been conducted to review the overall mishap rate among aviators who are flying with a waiver. This study evaluated the aeromedical waiver status of naval aviators involved in Class A mishaps from 1992-1999. Aviation mishaps in the U.S. Navy are investigated by trained personnel, who report their detailed findings to the U.S. Naval Safety Center (NSC). The Navy Operational Medicine Institute (NOMI) maintains a database of all aviation physicals, including the waiver status of individual aviators. A collaborative NSC/NOMI study was done to investigate the prevalence of waivers in mishap and non-mishap aviators. Records were retrieved on 234 naval aviators who were the "pilot at the controls" of Class A mishaps occurring from 1992-1999. This mishap waiver rate was compared with the baseline waiver rate for all pilots in 1994 (midpoint). Odds Ratios were calculated of having a Class A mishap if the aviator had a waiver. Analysis failed to find a statistical difference in waiver rates between mishap aviators and the general naval aviator population indicating that the U.S. Naval Aeromedical Service is providing aeromedically safe naval aviators to the fleet.

  9. 14 CFR 39.7 - What is the legal effect of failing to comply with an airworthiness directive?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false What is the legal effect of failing to comply with an airworthiness directive? 39.7 Section 39.7 Aeronautics and Space FEDERAL AVIATION... failing to comply with an airworthiness directive? Anyone who operates a product that does not meet the...

  10. 14 CFR 39.7 - What is the legal effect of failing to comply with an airworthiness directive?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false What is the legal effect of failing to comply with an airworthiness directive? 39.7 Section 39.7 Aeronautics and Space FEDERAL AVIATION... failing to comply with an airworthiness directive? Anyone who operates a product that does not meet the...

  11. 14 CFR 39.7 - What is the legal effect of failing to comply with an airworthiness directive?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false What is the legal effect of failing to comply with an airworthiness directive? 39.7 Section 39.7 Aeronautics and Space FEDERAL AVIATION... failing to comply with an airworthiness directive? Anyone who operates a product that does not meet the...

  12. 25 CFR 171.560 - What if I fail to make payments as specified in my Payment Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What if I fail to make payments as specified in my... AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial Matters: Assessments, Billing, and Collections § 171.560 What if I fail to make payments as specified in my Payment Plan? (a) We will discontinue...

  13. 25 CFR 171.560 - What if I fail to make payments as specified in my Payment Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What if I fail to make payments as specified in my... AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial Matters: Assessments, Billing, and Collections § 171.560 What if I fail to make payments as specified in my Payment Plan? (a) We will discontinue...

  14. A Psychodynamic Systems Perspective on Command Relationship during Combat Operations

    DTIC Science & Technology

    2017-06-09

    that theirs is a high likelihood of conflicts when leaders fail to act as a boundary regulator. Failing to act as a boundary regulator, affects the...healthy command climate based on mission command.2 However, leaders do not always succeed in this task, and when they fail it, can have severe... when a leader fails to fulfill his role as a boundary regulator, there is a marked potential for conflict, as was highlighted with the case where the

  15. Revisional bariatric surgery for failed gastric banding in Asia: a review of choice of revisional procedure, surgical technique and postoperative complication rates.

    PubMed

    Bhasker, A; Gadgil, M; Muda, N H; Lotwala, V; Lakdawala, M A

    2011-02-01

    In Asia, long-term weight loss results of gastric banding have been unsatisfactory. Bands are associated with higher complication rates, which result in a high reoperation rate. The aim of this paper is to discuss the choice of revisional procedure, operative technique and evaluate the postoperative complication rates. Between January 2007 and January 2010, we operated on 41 patients who were included retrospectively in this series. The most common reason for band removal was failure to lose adequate weight. Of those patients, 40 underwent band removal and conversion to a revisional bariatric surgery concomitantly; one patient's procedure was deferred to a later date. LSG was performed in 26 and LRYGB in 15. The highlights of the operative technique were meticulous dissection, complete removal of the pseudocapsule, choosing the right stapler cartridge, oversewing and inverting the entire staple line, and complete dissection of the left crus and pars flaccid. The median duration of surgery was 85 min (range, 55-180 min). There was no conversion to open surgery. The median stay in the hospital was 4 d (range, 2-7 d). There were no leaks or any other major complications in the postoperative period. Concomitant revisional procedure after removal of gastric band is safe and feasible. The operative technique followed at our center has had an extremely low postoperative morbidity rate and a 0% leak rate. © 2010 Japan Society for Endoscopic Surgery, Asia Endosurgery Task Force and Blackwell Publishing Asia Pty Ltd.

  16. Cardiac surgery in the Pacific Islands.

    PubMed

    Davis, Philip John; Wainer, Zoe; O'Keefe, Michael; Nand, Parma

    2011-12-01

    Rheumatic heart disease constitutes a significant disease burden in under-resourced communities. Recognition of the devastating impact of rheumatic heart disease has resulted in volunteer cardiac teams from Australasia providing surgical services to regions of need. The primary objective of this study was to compare New Zealand hospitals' volunteer cardiac surgical operative results in Samoa and Fiji with the accepted surgical mortality and morbidity rates for Australasia. A retrospective review from seven volunteer cardiac surgical trips to Samoa and Fiji from 2003 to 2009 was conducted. Patient data were retrospectively and prospectively collected. Preoperative morbidity and mortality risk were calculated using the European System for Cardiac Operative Risk Evaluation (euroSCORE). Audit data were collated in line with the Australasian Society of Cardiac and Thoracic Surgeons guidelines. One hundred and three operations were performed over 6 years. EuroSCORE predicted an operative mortality of 3.32%. In-hospital mortality was 0.97% and post-discharge mortality was 2.91%, resulting in a 30-day mortality of 3.88%. This study demonstrated that performing cardiac surgery in Fiji and Samoa is viable and safe. However, the mortality was slightly higher than predicted by euroSCORE. Difficulties exist in predicting mortality rates in patients with rheumatic heart disease from Pacific Island nations as known risk scoring models fail to be disease, ethnically or culturally inclusive. Audit processes and risk model development and assessment are an essential part of this complex surgical charity work and will result in improved patient selection and outcomes. © 2011 The Authors. ANZ Journal of Surgery © 2011 Royal Australasian College of Surgeons.

  17. Stress Corrosion of Ceramic Materials

    DTIC Science & Technology

    1981-10-01

    stresses are liable to fail after an indeterminate period of time, leading to a considerable uncertainty in the safe design stress. One of the objectives...of modern ceramics technology is to reduce the uncertainty associated with structural design , and hence, to improve our capabilities of designing ...processes that occur during stress corrosion cracking. Recent advances in th~earea of structural design with ceramic materials have lead to several

  18. Intranasal dexmedetomidine for sedation for pediatric computed tomography imaging.

    PubMed

    Mekitarian Filho, Eduardo; Robinson, Fay; de Carvalho, Werther Brunow; Gilio, Alfredo Elias; Mason, Keira P

    2015-05-01

    This prospective observational pilot study evaluated the aerosolized intranasal route for dexmedetomidine as a safe, effective, and efficient option for infant and pediatric sedation for computed tomography imaging. The mean time to sedation was 13.4 minutes, with excellent image quality, no failed sedations, or significant adverse events. Registered with ClinicalTrials.gov: NCT01900405. Copyright © 2015 Elsevier Inc. All rights reserved.

  19. Advanced manufacturing development of a composite empennage component for L-1011 aircraft. Phase 4: Full scale ground test

    NASA Technical Reports Server (NTRS)

    Jackson, A. C.; Dorwald, F.

    1982-01-01

    The ground tests conducted on the advanced composite vertical fin (ACVF) program are described. The design and fabrication of the test fixture and the transition structure, static test of Ground Test Article (GTA) No. 1, rework of GTA No. 2, and static, damage tolerance, fail-safe and residual strength tests of GTA No. 2 are described.

  20. Enhancing Students' Confidence in Employability Skills through the Practice of "Recall, Adapt and Apply"

    ERIC Educational Resources Information Center

    Sinclair, Alison J.

    2017-01-01

    The ability to apply prior knowledge to new challenges is a skill that is highly valued by employers, but the confidence to achieve this does not come naturally to all students. An essential step to becoming an independent researcher requires a transition between simply following a fail-safe set of instructions to being able to adapt a known…

  1. Adherence of Pharmaceutical Advertisements in Medical Journals to FDA Guidelines and Content for Safe Prescribing

    PubMed Central

    Korenstein, Deborah; Keyhani, Salomeh; Mendelson, Ali; Ross, Joseph S.

    2011-01-01

    Background Physician-directed pharmaceutical advertising is regulated in the United States by the Food and Drug Administration (FDA); adherence to current FDA guidelines is unknown. Our objective was to determine adherence rates of physician-directed print advertisements in biomedical journals to FDA guidelines and describe content important for safe prescribing. Methods and Findings Cross-sectional analysis of November 2008 pharmaceutical advertisements within top U.S.-based biomedical journals publishing original research. We excluded advertisements for devices, over the counter medications, and disease awareness. We utilized FDA guideline items identifying unique forms of advertisement bias to categorize advertisements as adherent to FDA guidelines, possibly non-adherent to at least 1 item, or non-adherent to at least 1 item. We also evaluated advertisement content important for safe prescribing, including benefit quantification, risk information and verifiable references. All advertisements were evaluated by 2 or more investigators, with differences resolved by discussion. Twelve journals met inclusion criteria. Nine contained pharmaceutical advertisements, including 192 advertisements for 82 unique products; median 2 per product (range 1–14). Six “teaser” advertisements presented only drug names, leaving 83 full unique advertisements. Fifteen advertisements (18.1%) adhered to all FDA guidelines, 41 (49.4%) were non-adherent with at least one form of FDA-described bias, and 27 (32.5%) were possibly non-adherent due to incomplete information. Content important for safe prescribing was often incomplete; 57.8% of advertisements did not quantify serious risks, 48.2% lacked verifiable references and 28.9% failed to present adequate efficacy quantification. Study limitations included its focus on advertisements from a single month, the subjectivity of FDA guidelines themselves, and the necessary subjectivity of determinations of adherence. Conclusions Few physician-directed print pharmaceutical advertisements adhere to all FDA guidelines; over half fail to quantify serious risks. The FDA could better protect public health by creating new more objective advertisement guidelines requiring transparent presentation of basic safety and efficacy information. PMID:21858076

  2. Adherence of pharmaceutical advertisements in medical journals to FDA guidelines and content for safe prescribing.

    PubMed

    Korenstein, Deborah; Keyhani, Salomeh; Mendelson, Ali; Ross, Joseph S

    2011-01-01

    Physician-directed pharmaceutical advertising is regulated in the United States by the Food and Drug Administration (FDA); adherence to current FDA guidelines is unknown. Our objective was to determine adherence rates of physician-directed print advertisements in biomedical journals to FDA guidelines and describe content important for safe prescribing. Cross-sectional analysis of November 2008 pharmaceutical advertisements within top U.S.-based biomedical journals publishing original research. We excluded advertisements for devices, over the counter medications, and disease awareness. We utilized FDA guideline items identifying unique forms of advertisement bias to categorize advertisements as adherent to FDA guidelines, possibly non-adherent to at least 1 item, or non-adherent to at least 1 item. We also evaluated advertisement content important for safe prescribing, including benefit quantification, risk information and verifiable references. All advertisements were evaluated by 2 or more investigators, with differences resolved by discussion. Twelve journals met inclusion criteria. Nine contained pharmaceutical advertisements, including 192 advertisements for 82 unique products; median 2 per product (range 1-14). Six "teaser" advertisements presented only drug names, leaving 83 full unique advertisements. Fifteen advertisements (18.1%) adhered to all FDA guidelines, 41 (49.4%) were non-adherent with at least one form of FDA-described bias, and 27 (32.5%) were possibly non-adherent due to incomplete information. Content important for safe prescribing was often incomplete; 57.8% of advertisements did not quantify serious risks, 48.2% lacked verifiable references and 28.9% failed to present adequate efficacy quantification. Study limitations included its focus on advertisements from a single month, the subjectivity of FDA guidelines themselves, and the necessary subjectivity of determinations of adherence. Few physician-directed print pharmaceutical advertisements adhere to all FDA guidelines; over half fail to quantify serious risks. The FDA could better protect public health by creating new more objective advertisement guidelines requiring transparent presentation of basic safety and efficacy information.

  3. Safe Autonomous Flight Environment (SAFE50) for the Notional Last 50 ft of Operation of 55 lb Class of UAS

    NASA Technical Reports Server (NTRS)

    Krishnakumar, Kalmanje; Kopardekar, Parimal; Ippolito, Corey; Melton, John E.; Stepanyan, Vahram; Sankararaman, Shankar; Nikaido, Ben

    2017-01-01

    The most difficult phase of small Unmanned Aerial System (sUAS) deployment is autonomous operations below the notional 50 ft in urban landscapes. Understanding the feasibility of safely flying sUAS autonomously below 50 ft is a game changer for many civilian applications. This paper outlines three areas of research currently underway which address key challenges for flight in the urban landscape. These are: (1) Off-line and On-board wind estimation and accommodation; (2) Real-time trajectory planning via characterization of obstacles using a LIDAR; (3) On-board information fusion for real-time decision-making and safe trajectory generation.

  4. Recommended Practices for the Safe Design and Operation of Flywheels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, Donald Arthur

    2015-12-01

    Flywheel energy storage systems are in use globally in increasing numbers . No codes pertaining specifically to flywheel energy storage exist. A number of industrial incidents have occurred. This protocol recommends a technical basis for safe flywheel de sign and operation for consideration by flywheel developers, users of flywheel systems and standards setting organizations.

  5. Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment

    NASA Astrophysics Data System (ADS)

    Cox, E. A.

    1982-02-01

    HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.

  6. Anti-backlash drive systems for multi-degree freedom devices

    DOEpatents

    Tsai, Lung-Wen; Chang, Sun-Lai

    1993-01-01

    A new and innovative concept for the control of backlash in gear-coupled transmission mechanisms. The concept utilizes redundant unidirectional drives to assure positive coupling of gear meshes at all times. Based on this concept, a methodology for the enumeration of admissible redundant-drive backlash-free robotic mechanisms has been established. Some typical two- and three-DOF mechanisms are disclosed. Furthermore, actuator torques have been derived as functions of either joint torques or end-effector dynamic performance requirements. A redundantly driven gear coupled transmission mechanism manipulator has a fail-safe advantage in that, except of the loss of backlash control, it can continue to function when one of its actuators fails. A two-DOF backlash-free arm has been reduced to practice to demonstrate the principle.

  7. A Human Proximity Operations System test case validation approach

    NASA Astrophysics Data System (ADS)

    Huber, Justin; Straub, Jeremy

    A Human Proximity Operations System (HPOS) poses numerous risks in a real world environment. These risks range from mundane tasks such as avoiding walls and fixed obstacles to the critical need to keep people and processes safe in the context of the HPOS's situation-specific decision making. Validating the performance of an HPOS, which must operate in a real-world environment, is an ill posed problem due to the complexity that is introduced by erratic (non-computer) actors. In order to prove the HPOS's usefulness, test cases must be generated to simulate possible actions of these actors, so the HPOS can be shown to be able perform safely in environments where it will be operated. The HPOS must demonstrate its ability to be as safe as a human, across a wide range of foreseeable circumstances. This paper evaluates the use of test cases to validate HPOS performance and utility. It considers an HPOS's safe performance in the context of a common human activity, moving through a crowded corridor, and extrapolates (based on this) to the suitability of using test cases for AI validation in other areas of prospective application.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Physical device safety is typically implemented locally using embedded controllers, while operations safety is primarily performed in control centers. Safe operations can be enhanced by correct design of device-level control algorithms, and protocols, procedures and operator training at the control-room level, but all can fail. Moreover, these elements exchange data and issue commands via vulnerable communication layers. In order to secure these gaps and enhance operational safety, we believe monitoring of command sequences must be combined with an awareness of physical device limitations and automata models that capture safety mechanisms. One way of doing this is by leveraging specification-based intrusionmore » detection to monitor for physical constraint violations. The method can also verify that physical infrastructure state is consistent with monitoring information and control commands exchanged between field devices and control centers. This additional security layer enhances protection from both outsider attacks and insider mistakes. We implemented specification-based SCADA command analyzers using physical constraint algorithms directly in the Bro framework and Broccoli APIs for three separate scenarios: a water heater, an automated distribution system, and an over-current protection scheme. To accomplish this, we added low-level analyzers capable of examining control system-specific protocol packets for both Modbus TCP and DNP3, and also higher-level analyzers able to interpret device command and data streams within the context of each device's physical capabilities and present operational state. Thus the software that we are making available includes the Bro/Broccoli scripts for these three scenarios, as well as simulators, written in C, of those scenarios that generate sample traffic that is monitored by the Bro/Broccoli scripts. In addition, we have also implemented systems to directly pull cyber-physical information from the OSIsoft PI historian system. We have included the Python scripts used to perform that monitoring.« less

  9. Cost analysis of spinal and general anesthesia for the surgical treatment of lumbar spondylosis.

    PubMed

    Walcott, Brian P; Khanna, Arjun; Yanamadala, Vijay; Coumans, Jean-Valery; Peterfreund, Robert A

    2015-03-01

    Lumbar spine surgery is typically performed under general anesthesia, although spinal anesthesia can also be used. Given the prevalence of lumbar spine surgery, small differences in cost between the two anesthetic techniques have the potential to make a large impact on overall healthcare costs. We sought to perform a cost comparison analysis of spinal versus general anesthesia for lumbar spine operations. Following Institutional Review Board approval, a retrospective cohort study was performed from 2009-2012 on consecutive patients undergoing non-instrumented, elective lumbar spine surgery for spondylosis by a single surgeon. Each patient was evaluated for both types of anesthesia, with the decision for anesthetic method being made based on a combination of physical status, anatomical considerations, and ultimately a consensus agreement between patient, surgeon, and anesthesiologist. Patient demographics and clinical characteristics were compared between the two groups. Operating room costs were calculated whilst blinded to clinical outcomes and reported in percentage difference. General anesthesia (n=319) and spinal anesthesia (n=81) patients had significantly different median operative times of 175 ± 39.08 and 158 ± 32.75 minutes, respectively (p<0.001, Mann-Whitney U test). Operating room costs were 10.33% higher for general anesthesia compared to spinal anesthesia (p=0.003, Mann-Whitney U test). Complications of spinal anesthesia included excessive movement (n=1), failed spinal attempt (n=3), intraoperative conversion to general anesthesia (n=2), and a high spinal level (n=1). In conclusion, spinal anesthesia can be performed safely in patients undergoing lumbar spine surgery. It has the potential to reduce operative times, costs, and possibly, complications. Further prospective evaluation will help to validate these findings. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. Transarterial Onyx Embolization for Patients with Cavernous Sinus Dural Arteriovenous Fistulas Who Have Failed Transvenous Embolization.

    PubMed

    Wen, Jun; Duan, Chuan-Zhi; Huang, Li-Jing; Zhang, Xin; He, Xu-Ying; Li, Xi-Feng

    2015-09-01

    Transvenous embolization is the treatment of choice for cavernous sinus dural arteriovenous fistulas (csDAVFs) despite occasional difficulty in transvenous catheterization. We reported our experience in the treatment of csDAVFs by transarterial Onyx embolization in patients who had failed transvenous catheterization. We reviewed the clinical and radiographic records of csDAVFs patients receiving transarterial Onyx embolization after failed transvenous Onyx embolization at our institution over a period of 31 months. Success was defined as complete or near complete occlusion upon angiographic examination. In seven cases, the microcatheter failed to reach the cavernous sinus; in the remaining case, the internal jugular vein was occlusive. Eight sessions of the embolization and catheterization procedures via the arterial routes were conducted. Among them, five cases via the middle meningeal artery and the other three via the accessory meningeal artery. Angiography, immediately after embolization, revealed complete occlusion in seven cases (87.5 %) and partial occlusion in the remaining case. Angiographic follow-up (range, 6-10 months) showed that all patients achieved complete embolization. In cases where transvenous embolization of the cavernous sinus is difficult, transarterial embolization of the fistulas offers a safe and effective alternative.

  11. Evaluation of the safety benefits of legacy safe routes to school programs

    DOT National Transportation Integrated Search

    2008-08-01

    This study first examined the feasibility of conducting a crash-based assessment of the safety effects of legacy Safe Routes to School : (SRTS) programs. These were SRTS programs operating before the passage of the Safe, Accountable, Flexible, Effici...

  12. Approach to transaction management for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Easton, C. R.; Cressy, Phil; Ohnesorge, T. E.; Hector, Garland

    1990-01-01

    The Space Station Freedom Manned Base (SSFMB) will support the operation of the many payloads that may be located within the pressurized modules or on external attachment points. The transaction management (TM) approach presented provides a set of overlapping features that will assure the effective and safe operation of the SSFMB and provide a schedule that makes potentially hazardous operations safe, allocates resources within the capability of the resource providers, and maintains an environment conducive to the operations planned. This approach provides for targets of opportunity and schedule adjustments that give the operators the flexibility to conduct a vast majority of their operations with no conscious involvement with the TM function.

  13. The implementation of fail-operative functions in integrated digital avionics systems

    NASA Technical Reports Server (NTRS)

    Osoer, S. S.

    1976-01-01

    System architectures which incorporate fail operative flight guidance functions within a total integrated avionics complex are described. It is shown that the mixture of flight critical and nonflight critical functions within a common computer complex is an efficient solution to the integration of navigation, guidance, flight control, display, and flight management. Interfacing subsystems retain autonomous capability to avoid vulnerability to total avionics system shutdown as a result of only a few failures.

  14. Endovascular stent-graft repair of failed endovascular abdominal aortic aneurysm repair.

    PubMed

    Baril, Donald T; Silverberg, Daniel; Ellozy, Sharif H; Carroccio, Alfio; Jacobs, Tikva S; Sachdev, Ulka; Teodorescu, Victoria J; Lookstein, Robert A; Marin, Michael L

    2008-01-01

    Despite high initial technical success, the long-term durability of endovascular abdominal aortic aneurysm repair (EVAR) continues to be a concern. Following EVAR, patients can experience endoleaks, device migration, device fractures, or aneurysm growth that may require intervention. The purpose of this study was to review all patients treated with secondary endovascular devices at our institution for failed EVAR procedures. Over an 8-year period, 988 patients underwent EVAR, of whom 42 (4.3%) required secondary interventions involving placement of additional endovascular devices. Data regarding patient characteristics, aneurysm size, initial device type, time until failure, failure etiology, secondary interventions, and outcomes were reviewed. The mean time from initial operation until second operation was 34.1 months. Failures included type I endoleaks in 38 patients (90.5%), type III endoleaks in two patients (4.8%), and enlarging aneurysms without definite endoleaks in two patients (4.8%). The overall technical success rate for secondary repair was 92.9% (39/42). Perioperative complications occurred in nine patients (21.4%), including wound complications (n = 6), cerebrovascular accident (CVA) (n = 1), foot drop (n = 1), and death (n = 1). Mean follow-up following secondary repair was 16.4 months (range 1-50). Eighty-six percent of patients treated with aortouni-iliac devices had successful repairs compared to 45% of patients treated with proximal cuffs. Ten patients (23.8%) had persistent or recurrent type I or type III endoleaks following revision. Of these, four had tertiary interventions, including two patients who had additional devices placed. Failures following EVAR occur in a small but significant number of patients. When anatomically possible, endovascular revision offers a safe means of treating these failures. Aortouni-iliac devices appear to offer a more durable repair than the proximal cuff for treatment of proximal type I endoleaks. Midterm results indicate that these patients may require additional procedures but have a low rate of aneurysm-related mortality. Longer-term follow-up is necessary to determine the durability of these endovascular revisions.

  15. Preventing the first cesarean delivery: summary of a joint Eunice Kennedy Shriver National Institute of Child Health and Human Development, Society for Maternal-Fetal Medicine, and American College of Obstetricians and Gynecologists Workshop.

    PubMed

    Spong, Catherine Y; Berghella, Vincenzo; Wenstrom, Katharine D; Mercer, Brian M; Saade, George R

    2012-11-01

    With more than one third of pregnancies in the United States being delivered by cesarean and the growing knowledge of morbidities associated with repeat cesarean deliveries, the Eunice Kennedy Shriver National Institute of Child Health and Human Development, the Society for Maternal-Fetal Medicine, and the American College of Obstetricians and Gynecologists convened a workshop to address the concept of preventing the first cesarean delivery. The available information on maternal and fetal factors, labor management and induction, and nonmedical factors leading to the first cesarean delivery was reviewed as well as the implications of the first cesarean delivery on future reproductive health. Key points were identified to assist with reduction in cesarean delivery rates including that labor induction should be performed primarily for medical indication; if done for nonmedical indications, the gestational age should be at least 39 weeks or more and the cervix should be favorable, especially in the nulliparous patient. Review of the current literature demonstrates the importance of adhering to appropriate definitions for failed induction and arrest of labor progress. The diagnosis of "failed induction" should only be made after an adequate attempt. Adequate time for normal latent and active phases of the first stage, and for the second stage, should be allowed as long as the maternal and fetal conditions permit. The adequate time for each of these stages appears to be longer than traditionally estimated. Operative vaginal delivery is an acceptable birth method when indicated and can safely prevent cesarean delivery. Given the progressively declining use, it is critical that training and experience in operative vaginal delivery are facilitated and encouraged. When discussing the first cesarean delivery with a patient, counseling should include its effect on future reproductive health.

  16. Preventing the First Cesarean Delivery: Summary of a Joint Eunice Kennedy Shriver National Institute of Child Health and Human Development, Society for Maternal-Fetal Medicine, and American College of Obstetricians and Gynecologists Workshop

    PubMed Central

    Spong, Catherine Y.; Berghella, Vincenzo; Wenstrom, Katharine D.; Mercer, Brian M.; Saade, George R.

    2012-01-01

    With over one-third of pregnancies in the United States being delivered by cesarean and the growing knowledge of morbidities associated with repeat cesarean deliveries, the Eunice Kennedy Shriver National Institute of Child Health and Human Development, the Society for Maternal-Fetal Medicine, and the American College of Obstetricians and Gynecologists convened a workshop to address the concept of preventing the first cesarean. The available information on maternal and fetal factors, labor management and induction, and non-medical factors leading to the first cesarean were reviewed as well as the implications of the first cesarean on future reproductive health. Key points were identified to assist with reduction in cesarean rates including that labor induction should be performed primarily for medical indication; if done for non-medical indications, the gestational age should be at least 39 weeks or more and the cervix should be favorable, especially in the nulliparous patient. Review of the current literature demonstrates the importance of adhering to appropriate definitions for failed induction and arrest of labor progress. The diagnosis of “failed induction” should only be made after an adequate attempt. Adequate time for normal latent and active phases of the first stage, and for the second stage, should be allowed, as long as the maternal and fetal conditions permit. The adequate time for each of these stages appears to be longer than traditionally estimated. Operative vaginal delivery is an acceptable birth method when indicated, and can safely prevent cesarean delivery. Given the progressively declining use, it is critical that training and experience in operative vaginal delivery is facilitated and encouraged. When discussing the first cesarean with a patient, counseling should include its effect on future reproductive health. PMID:23090537

  17. Military applications of emission and susceptibility data

    NASA Astrophysics Data System (ADS)

    Kohlbacher, Howard; Walker, William

    A basic design consideration for new military communications-electronics (C-E) equipment is that it be electromagnetically compatible with the environment in which it will operate. A military standard (MIL-STD-461B) describes the design requirements for the control of the unintentional electromagnetic emission and susceptibility characteristics of electronic equipment and subsystems designed or procured by the US Department of Defense. For new systems which fail the test standards of MIL-STD-461B with regard to radiated susceptibility (RSO3) or radiated emissions (RE02), a decision must be made to fix the new system or to field it without a fix. A procedure to aid in the decision process is outlined. The minimum separation distances required between a failed test system and other C-E equipment in its environment to avoid interference are determined. If this distance is operationally acceptable, the failed unit may be considered to be operationally compatible with its electromagnetic environment.

  18. Transcatheter aortic valve implantation for failing surgical aortic bioprosthetic valve: from concept to clinical application and evaluation (part 2).

    PubMed

    Piazza, Nicolo; Bleiziffer, Sabine; Brockmann, Gernot; Hendrick, Ruge; Deutsch, Marcus-André; Opitz, Anke; Mazzitelli, Domenico; Tassani-Prell, Peter; Schreiber, Christian; Lange, Rüdiger

    2011-07-01

    This study sought to review the acute procedural outcomes of patients who underwent transcatheter aortic valve (TAV)-in-surgical aortic valve (SAV) implantation at the German Heart Center, Munich, and to summarize the existing literature on TAV-in-SAV implantation (n = 47). There are several case reports and small case series describing transcatheter aortic valve implantation for a failing surgical aortic valve bioprosthesis (TAV-in-SAV implantation). From January 2007 to March 2011, 20 out of 556 patients underwent a TAV-in-SAV implantation at the German Heart Center Munich. Baseline characteristics and clinical outcome data were prospectively entered into a dedicated database. The mean patient age was 75 ± 13 years, and the mean logistic European System for Cardiac Operative Risk Evaluation and Society of Thoracic Surgeons' Risk Model scores were 27 ± 13% and 7 ± 4%, respectively. Of the 20 patients, 14 had stented and 6 had stentless surgical bioprostheses. Most cases (12 of 20) were performed via the transapical route using a 23-mm Edwards Sapien prosthesis (Edwards Lifesciences, Irvine, California). Successful implantation of a TAV in a SAV with the patient leaving the catheterization laboratory alive was achieved in 18 of 20 patients. The mean transaortic valve gradient was 20.0 ± 7.5 mm Hg. None-to-trivial, mild, and mild-to-moderate paravalvular aortic regurgitation was observed in 10, 6, and 2 patients, respectively. We experienced 1 intraprocedural death following pre-implant balloon aortic valvuloplasty ("stone heart") and 2 further in-hospital deaths due to myocardial infarction. TAV-in-SAV implantation is a safe and feasible treatment for high-risk patients with failing aortic bioprosthetic valves and should be considered as part of the armamentarium in the treatment of aortic bioprosthetic valve failure. Copyright © 2011 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  19. Development of an Electric Motor Powered Low Cost Coconut Deshelling Machine

    NASA Astrophysics Data System (ADS)

    Mondal, Imdadul Hoque; Prasanna Kumar, G. V.

    2016-06-01

    An electric motor powered coconut deshelling machine was developed in line with the commercially available unit, but with slight modifications. The machine worked on the principle that the coconut shell can be caused to fail in shear and compressive forces. It consisted of a toothed wheel, a deshelling rod, an electric motor, and a compound chain drive. A bevelled 16 teeth sprocket with 18 mm pitch was used as the toothed wheel. Mild steel round bar of 18 mm diameter was used as the deshelling rod. The sharp edge tip of the deshelling rod was inserted below the shell to apply shear force on the shell, and the fruit was tilted toward the rotary toothed wheel to apply the compressive force on the shell. The speed of rotation of the toothed wheel was set at 34 ± 2 rpm. The output capacity of the machine was found to be 24 coconuts/h with 95 % of the total time effectively used for deshelling. The labour requirement was found to be 43 man-h/1000 nuts. About 13 % of the kernels got scraped and about 7 % got sliced during the operation. The developed coconut deshelling machine was recommended for the minimum annual use of 200 h or deshelling of 4700 coconuts per year. The cost of operation for 200 h of annual use was found to be about ` 47/h. The developed machine was found to be simple, easy to operate, energy efficient, safe and reduce drudgery involved in deshelling by conventional methods.

  20. Majority-voted logic fail-sense circuit

    NASA Technical Reports Server (NTRS)

    Mclyman, W. T.

    1977-01-01

    Fail-sense circuit has majority-voted logic component which receives three error voltage signals that are sensed at single point by three error amplifiers. If transistor shorts, only one signal is required to operate; if transistor opens, two signals are required.

  1. Management of post-traumatic elbow instability after failed radial head excision: A case report.

    PubMed

    Touloupakis, Georgios; Theodorakis, Emmanouil; Favetti, Fabio; Nannerini, Massimiliano

    2017-02-01

    Radial head excision has always been a safe commonly used surgical procedure with a satisfactory clinical outcome for isolated comminuted radial head fractures. However, diagnosis of elbow instability is still very challenging and often underestimated in routine orthopaedic evaluation. We present the case of a 21-years old female treated with excision after radial head fracture, resulting in elbow instability. The patient underwent revision surgery after four weeks. We believe that ligament reconstruction without radial head substitution is a safe alternative choice for Mason III radial head fractures accompanied by complex ligament lesions. Copyright © 2017 Daping Hospital and the Research Institute of Surgery of the Third Military Medical University. Production and hosting by Elsevier B.V. All rights reserved.

  2. Planetary boundaries: exploring the safe operating space for humanity

    Treesearch

    Johan Rockström; Will Steffen; Kevin Noone; Asa Persson; F. Stuart Chapin; Eric Lambin; Timothy M. Lenton; Marten Scheffer; Carl Folke; Hans Joachim Schellnhuber; Björn Nykvist; Cynthia A. de Wit; Terry Hughes; Sander van der Leeuw; Henning Rodhe; Sverker Sörlin; Peter K. Snyder; Robert Costanza; Uno Svedin; Malin Falkenmark; Louise Karlberg; Robert W. Corell; Victoria J. Fabry; James Hansen; Brian Walker; Diana Liverman; Katherine Richardson; Paul Crutzen; Jonathan Foley

    2009-01-01

    Anthropogenic pressures on the Earth System have reached a scale where abrupt global environmental change can no longer be excluded. We propose a new approach to global sustainability in which we define planetary boundaries within which we expect that humanity can operate safely. Transgressing one or more planetary boundaries may be deleterious or even catastrophic due...

  3. The Role of Well Control Training in Developing Safe Onshore and Offshore Oil Drilling Operations

    ERIC Educational Resources Information Center

    Abulhassn, Aber

    2016-01-01

    This research investigates the role of the International Well Control Forum (IWCF) Rotary Drilling Well Control Training Program in developing safe oil drilling operations from the perspective of onshore and offshore drilling crews. The research methodology is a qualitative case study. A total of 40 IWCF candidates were interviewed, with 10 from…

  4. 50 CFR 300.113 - Scientific observers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... observers that are equivalent to those provided for officers of the vessel; and (2) Safe conditions. (i) Maintain safe conditions on the vessel for the protection of observers including adherence to all U.S. Coast Guard and other applicable rules, regulations, or statutes pertaining to safe operation of the...

  5. A Vision in Jeopardy: Royal Navy Maritime Autonomous Systems (MAS)

    DTIC Science & Technology

    2017-03-31

    Chapter 6 will propose a new MAS vision for the RN. However, before doing so, a fresh look at the problem is required. Consensus of the Problem, Not the... assessment , the RN has failed to deliver any sustainable MAS operational capability. A vision for MAS finally materialized in 2014. Yet, the vision...continuous investment and assessment , the RN has failed to deliver any sustainable MAS operational capability. A vision for MAS finally materialized in

  6. Exploring varieties of knowledge in safe work practices - an ethnographic study of surgical teams

    PubMed Central

    2011-01-01

    Background Within existing research in health and medicine, the nature of knowledge on how teams conduct safe work practices has yet to be properly explored. Methods We address this concern by exploring the varieties in which knowledge is expressed during interdisciplinary surgical operations. Specifically, the study was conducted in a surgical section of a Norwegian regional general hospital, between January and April of 2010, by means of an ethnographic design combining detailed non-participant observations, conversations and semi-structured interviews. Results Based on an analysis of the gathered data, we identify three particular themes in how knowledge is expressed by operating room personnel: (i) the ability and variety individuals demonstrate in handling multiple sources of information, before reaching a particular decision, (ii) the variety of ways awareness or anticipation of future events is expressed, and (iii) the different ways sudden and unexpected situations are handled by the individual team members. Conclusions We conclude that these facets of knowledge bring different insights into how safe work practices are achieved at an individual and team level in surgical operations, thus adding to the existing understanding of the nature of knowledge in safe work practices in surgical operations. Future research should focus on exploring and documenting the relationships between various elements of knowledge and safe work practices, in different surgical settings and countries. PMID:21914183

  7. Is the use of hemostatic matrix (Floseal) and alkylene oxide copolymer (Ostene) safe in spinal laminectomies? Peridural fibrosis assessment.

    PubMed

    Gurcan, Oktay; Gurcay, Ahmet Gurhan; Kazanci, Atilla; Onder, Evrim; Senturk, Salim; Bavbek, Murad

    2017-03-01

    Failed Back Syndrome (FBS) is unacceptable relief of pain or recurrence of symptoms in patients after spinal surgery, such as laminectomy. One possible cause of FBS is peridural fibrosis (PF). PF is the overproduction of scar tissue adjacent to the dura mater. Bleeding can cause PF after laminectomy. Ostene is an alkylene oxide copolymer material used to stop bleeding from bony surfaces. Floseal is a gelatin thrombin matrix sealant used to assist fibrin formation and to promote coagulation. Total of 32 female Sprague-Dawley rats were evenly allotted to 4 experimental groups: laminectomy only, laminectomy + Ostene (Baxter International, Inc., Deerfield, IL, USA), laminectomy + Floseal (Baxter International, Inc., Deerfield, IL, USA), and laminectomy + Adcon-L (aap Implantate AG, Berlin, Germany). After performing total laminectomy, agents were placed over dura mater. Spinal column of test subjects was harvested 6 weeks after laminectomy. Histopathological examination of samples was based on Masson's trichrome and hematoxylin and eosin staining. PF observed in the groups was graded using system previously described by He et al. Statistically significant p value was defined as p < 0.005. Present study revealed that Adcon-L, Ostene, and Floseal groups had reduced PF compared with laminectomy only group (p = 0.001). Comparison of Ostene and Floseal groups with Adcon-L group yielded no significant difference. Reoperation as result of FBS has greater risk and often has poor outcome; surgeons must take precautions to avoid FBS, such as careful selection of appropriate patient and operation technique. Ostene and Floseal may be applied and left in the operation field safely during laminectomy to reduce occurrence of PF after procedure. Copyright © 2017 Turkish Association of Orthopaedics and Traumatology. Production and hosting by Elsevier B.V. All rights reserved.

  8. Mentored retroperitoneal laparoscopic renal surgery in children: a safe approach to learning.

    PubMed

    Farhat, W; Khoury, A; Bagli, D; McLorie, G; El-Ghoneimi, A

    2003-10-01

    To review the feasibility of introducing advanced retroperitoneal renal laparoscopic surgery (RRLS) to a paediatric urology division, using the mentorship-training model. Although the scope of practice in paediatric urology is currently adapting endoscopic surgery into daily practice, most paediatric urologists in North America have had no formal training in laparoscopic surgery. The study included four paediatric urologists with 3-25 years of practice; none had had any formal laparoscopic training or ever undertaken advanced RRLS. An experienced laparoscopic surgeon (the mentor) assisted the learning surgeons over a year. The initial phases of learning incorporated detailed lectures, visualization through videotapes and 'hands-on' demonstration by the expert in the technique of the standardized steps for each type of surgery. Over 10 months, ablative and reconstructive RRLS was undertaken jointly by the surgeons and the mentor. After this training the surgeons operated independently. To prevent lengthy operations, conversion to open surgery was planned if there was no significant progression after 2 h of laparoscopic surgery. Over the 10 months of mentorship, 36 RRLS procedures were undertaken in 31 patients (28 ablative and eight reconstructive). In all cases the mentored surgeons accomplished both retroperitoneal access and the creation of a working space within the cavity. The group was able to initiate ablative RRLS but the mentor undertook all the reconstructive procedures. After the mentorship period, over 10 months, 12 ablative procedures were undertaken independently, and five other attempts at RRLS failed. Although the mentored approach can successfully and safely initiate advanced RRLS in a paediatric urology division, assessing the laparoscopic practice pattern after mentorship in the same group of trainees is warranted. Ablative RRLS is easier to learn for the experienced surgeon, but reconstructive procedures, e.g. pyeloplasty, require a high degree of skill in laparoscopic technique, which may only be acquired through formal training focusing primarily on suturing techniques.

  9. CHEMICAL RIGIDIZATION OF EXPANDABLE STRUCTURES.

    DTIC Science & Technology

    The objective of this program was to develop a chemical rigidization process that could be activated by an on-command mechanism and be capable of...and rigidized in the high vacuum facilities atWright-Patterson AFB, Ohio and were delivered to the Air Force. A fail-safe chemical rigidization system...have been varied from fifteen minutes to two hours. The chemical system, a vinyl-type monomer, has exhibited a sustained shelf-life, under ambient

  10. Efficiently, Effectively Detecting Mobile App Bugs with AppDoctor

    DTIC Science & Technology

    2014-04-01

    1 ∼ 5 ACV Comic Viewer 2 1 ∼ 5 Yes OpenSudoku 1 1 ∼ 5 Yes OI Notepad 1 0.1 ∼ 0.5 Yes OI Safe 1 0.1 ∼ 0.5 Yes Table 1: Each app’s bug count. First row... Comic Viewer Incorrect assumption of the presence of Google Services caused a crash Reported 6 ACV Comic Viewer Failed to check for the failure of

  11. FAIL-SAFE: Fault Aware IntelLigent Software for Exascale

    DTIC Science & Technology

    2016-06-13

    and that these programs can continue to correct solutions. To broaden the impact of this research, we also needed to be able to ameliorate errors...designing an interface between the application and an introspection framework for resilience ( IFR ) based on the inference engine SHINE; (4) using...the ROSE compiler to translate annotations into reasoning rules for the IFR ; and (5) designing a Knowledge/Experience Database, which will store

  12. Rational use of analgesic combinations.

    PubMed

    Phero, James C; Becker, Daniel

    2002-10-01

    Careful selection of an effective analgesic regimen based on the amount and type of pain the patient is expected to have can prevent the stress and anxiety associated with breakthrough pain. When analgesics fail, it is not unusual for patients to go to desperate lengths to seek relief. The clinician can and should develop a variety of effective, safe analgesic regimens based on estimates of anticipated pain intensity that apply sound pharmacologic principles.

  13. The U.S. Food and Drug Administration's Evaluation of the Safety of Animal Clones: A Failure to Recognize the Normativity of Risk Assessment Projects

    ERIC Educational Resources Information Center

    Meghani, Zahra; de Melo-Martin, Inmaculada

    2009-01-01

    The U.S. Food and Drug Administration (FDA) announced recently that food products derived from some animal clones and their offspring are safe for human consumption. In response to criticism that it had failed to engage with ethical, social, and economic concerns raised by livestock cloning, the FDA argued that addressing normative issues prior to…

  14. An Approach to Forward Presence in a Resource-Constrained Environment

    DTIC Science & Technology

    2013-03-01

    working quietly to coordinate cooperation between Indonesia, Malaysia , and Singapore , who were historically distrustful of each other. Through...freedom of action. Non-state actors will likely seek to capitalize on these weakening and corrupt failing states as potential safe havens. The low...11 Figure 1. 2011 Defense Spending: United States vs . 16 Next Leading Spenders44 Department of Defense can feel like it is hard pressed for

  15. 27 CFR 53.159 - Deposit requirement for deposits made for calendar quarters beginning on or after July 1, 1995.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... required under this part, the appropriate TTB officer may withdraw the person's right to use the safe... officer may also require a taxpayer who fails to make deposits of tax to file a monthly or semimonthly...-25, each deposit required to be made by this section shall be made not later than the 9th day of the...

  16. 77 FR 64050 - FMCSA Policy on the Suspension of Operating Authority for Hostage Load Violations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-18

    ... motor carrier or broker knowingly and willfully fails, in violation of a contract, to deliver or unload... upon a determination by FMCSA that the carrier or broker knowingly and willfully failed, in violation...

  17. Effects of foot reflexology on fatigue, sleep and pain: a systematic review and meta-analysis.

    PubMed

    Lee, Jeongsoon; Han, Misook; Chung, Younghae; Kim, Jinsun; Choi, Jungsook

    2011-12-01

    The purpose of this study was to evaluate the effectiveness of foot reflexology on fatigue, sleep and pain. A systematic review and meta-analysis were conducted. Electronic database and manual searches were conducted on all published studies reporting the effects of foot reflexology on fatigue, sleep, and pain. Forty four studies were eligible including 15 studies associated with fatigue, 18 with sleep, and 11 with pain. The effects of foot reflexology were analyzed using Comprehensive Meta-Analysis Version 2.0. The homogeneity and the fail-safe N were calculated. Moreover, a funnel plot was used to assess publication bias. The effects on fatigue, sleep, and pain were not homogeneous and ranged from 0.63 to 5.29, 0.01 to 3.22, and 0.43 to 2.67, respectively. The weighted averages for fatigue, sleep, and pain were 1.43, 1.19, and 1.35, respectively. No publication bias was detected as evaluated by fail-safe N. Foot reflexology had a larger effect on fatigue and sleep and a smaller effect on pain. This meta-analysis indicates that foot reflexology is a useful nursing intervention to relieve fatigue and to promote sleep. Further studies are needed to evaluate the effects of foot reflexology on outcome variables other than fatigue, sleep and pain.

  18. [Use of Gastrografin(®) in the management of adhesion intestinal obstruction].

    PubMed

    Mora López, Laura; Serra-Aracil, Xavier; Llaquet Bayo, Heura; Navarro Soto, Salvador

    2013-01-01

    Adhesions are the most important cause of intestinal obstruction. Approximately 25% of surgical admissions for acute abdominal conditions are due to intestinal obstruction. Better diagnostic and treatment methods of intestinal obstruction could potentially reduce mortality rate to 5-10%. Gastrografin(®) could contribute to this achieve this. To present a protocol to treat adhesion intestinal obstruction with Gastrografin(®) that is safe, and allows shorter hospital stays and shorter time between admission and surgery. All patients with adhesion intestinal obstruction without symptoms of strangulation were treated with Gastrografin(®), intravenous fluids and nasogastric tube. Those in whom contrast reach the colon in 8, 12 or 24hours were considered to have partial obstruction, and were fed orally. If Gastrografin(®) failed in the following 24hours, a laparotomy was performed. Out of a total of 211 episodes (164 patients), 170 episodes received contrast and in 142 cases Gastrografin(®) reached the colon (104 episodes at 8h, 11 at 12h, and 27 at 24h). A laparotomy was required in 28 patients because of failed treatment, and in another 5 for other causes. A management protocol for adhesion intestinal obstruction with Gastrografin(®) is safe, reduces morbidity and mortality, and leads to a shorter hospital stay. Copyright © 2012 AEC. Published by Elsevier Espana. All rights reserved.

  19. Needle Revision With 5-fluorouracil for the Treatment of Ahmed Glaucoma Valve Filtering Blebs: 5-Fluoruracil Needling Revision can be a Useful and Safe Tool in the Management of Failing Ahmed Glaucoma Valve Filtering Blebs.

    PubMed

    Quaranta, Luciano; Floriani, Irene; Hollander, Lital; Poli, Davide; Katsanos, Andreas; Konstas, Anastasios G P

    2016-04-01

    To determine the outcome of needling with adjunctive 5-fluorouracil (5-FU) in patients with a failing Ahmed glaucoma valve (AGV) implant, and to identify predictors of long-term intraocular pressure (IOP) control. A prospective observational study was performed on consecutive patients with medically uncontrolled primary open-angle glaucoma (POAG) with AGV encapsulation or fibrosis and inadequate IOP control. Bleb needling with 5-FU injection (0.1 mL of 50 mg/mL) was performed at the slit-lamp. Patients were examined 1 week following the needling, and then at months 1, 3, and 6. Subsequent follow-up visits were scheduled at 6-month intervals for at least 2 years. Needling with 5-FU was repeated no more than twice during the first 3 months of the follow-up. Procedure outcome was determined on the basis of the recorded IOP levels. Thirty-six patients with an encapsulated or fibrotic AGV underwent 67procedures (mean 1.86 ± 0.83). Complete success, defined as IOP ≤ 18 mm Hg without medications, was obtained in 25% at 24 months of observation. The cumulative proportion of cases achieving either qualified (ie, IOP ≤ 18 mm Hg with medications) or complete success at 24 months of observation was 72.2%. In a univariate Cox proportional hazards model, age was the only variable that independently influenced the risk of failing 5-FU needling revision. Fourteen eyes (38.8%) had a documented complication. Needling over the plate of an AGV supplemented with 5-FU is an effective and safe choice in a significant proportion of POAG patients with elevated IOP due to encapsulation or fibrosis.

  20. Recombinant Newcastle disease viral vector expressing hemagglutinin or fusion of canine distemper virus is safe and immunogenic in minks.

    PubMed

    Ge, Jinying; Wang, Xijun; Tian, Meijie; Gao, Yuwei; Wen, Zhiyuan; Yu, Guimei; Zhou, Weiwei; Zu, Shulong; Bu, Zhigao

    2015-05-15

    Canine Distemper Virus (CDV) infects many carnivores and cause several high-mortality disease outbreaks. The current CDV live vaccine cannot be safely used in some exotic species, such as mink and ferret. Here, we generated recombinant lentogenic Newcastle disease virus (NDV) LaSota expressing either envelope glycoproyein, heamagglutinine (H) or fusion protein (F), named as rLa-CDVH and rLa-CDVF, respectively. The feasibility of these recombinant NDVs to serve as live virus-vectored CD vaccine was evaluated in minks. rLa-CDVH induced significant neutralization antibodies (NA) to CDV and provided solid protection against virulent CDV challenge. On the contrast, rLa-CDVF induced much lower NA to CDV and fail to protected mink from virulent CDV challenge. Results suggest that recombinant NDV expressing CDV H is safe and efficient candidate vaccine against CDV in mink, and maybe other host species. Copyright © 2015 Elsevier Ltd. All rights reserved.

Top