Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions
NASA Technical Reports Server (NTRS)
Newhouse, Marilyn E.; McDougal, John; Barley, Bryan; Stephens Karen; Fesq, Lorraine M.
2010-01-01
Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, particularly as fault management development issues affect operations and the development of operations capabilities.
NASA Spacecraft Fault Management Workshop Results
NASA Technical Reports Server (NTRS)
Newhouse, Marilyn; McDougal, John; Barley, Bryan; Fesq, Lorraine; Stephens, Karen
2010-01-01
Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, as well as opportunities identified for future investment in tools, processes, and products to facilitate the development of space flight fault management capabilities.
Current Fault Management Trends in NASA's Planetary Spacecraft
NASA Technical Reports Server (NTRS)
Fesq, Lorraine M.
2009-01-01
The key product of this three-day workshop is a NASA White Paper that documents lessons learned from previous missions, recommended best practices, and future opportunities for investments in the fault management domain. This paper summarizes the findings and recommendations that are captured in the White Paper.
2009 fault tolerance for extreme-scale computing workshop, Albuquerque, NM - March 19-20, 2009.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katz, D. S.; Daly, J.; DeBardeleben, N.
2009-02-01
This is a report on the third in a series of petascale workshops co-sponsored by Blue Waters and TeraGrid to address challenges and opportunities for making effective use of emerging extreme-scale computing. This workshop was held to discuss fault tolerance on large systems for running large, possibly long-running applications. The main point of the workshop was to have systems people, middleware people (including fault-tolerance experts), and applications people talk about the issues and figure out what needs to be done, mostly at the middleware and application levels, to run such applications on the emerging petascale systems, without having faults causemore » large numbers of application failures. The workshop found that there is considerable interest in fault tolerance, resilience, and reliability of high-performance computing (HPC) systems in general, at all levels of HPC. The only way to recover from faults is through the use of some redundancy, either in space or in time. Redundancy in time, in the form of writing checkpoints to disk and restarting at the most recent checkpoint after a fault that cause an application to crash/halt, is the most common tool used in applications today, but there are questions about how long this can continue to be a good solution as systems and memories grow faster than I/O bandwidth to disk. There is interest in both modifications to this, such as checkpoints to memory, partial checkpoints, and message logging, and alternative ideas, such as in-memory recovery using residues. We believe that systematic exploration of these ideas holds the most promise for the scientific applications community. Fault tolerance has been an issue of discussion in the HPC community for at least the past 10 years; but much like other issues, the community has managed to put off addressing it during this period. There is a growing recognition that as systems continue to grow to petascale and beyond, the field is approaching the point where we don't have any choice but to address this through R&D efforts.« less
Managing Fault Management Development
NASA Technical Reports Server (NTRS)
McDougal, John M.
2010-01-01
As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.
Fault Management Architectures and the Challenges of Providing Software Assurance
NASA Technical Reports Server (NTRS)
Savarino, Shirley; Fitz, Rhonda; Fesq, Lorraine; Whitman, Gerek
2015-01-01
Fault Management (FM) is focused on safety, the preservation of assets, and maintaining the desired functionality of the system. How FM is implemented varies among missions. Common to most missions is system complexity due to a need to establish a multi-dimensional structure across hardware, software and spacecraft operations. FM is necessary to identify and respond to system faults, mitigate technical risks and ensure operational continuity. Generally, FM architecture, implementation, and software assurance efforts increase with mission complexity. Because FM is a systems engineering discipline with a distributed implementation, providing efficient and effective verification and validation (V&V) is challenging. A breakout session at the 2012 NASA Independent Verification & Validation (IV&V) Annual Workshop titled "V&V of Fault Management: Challenges and Successes" exposed this issue in terms of V&V for a representative set of architectures. NASA's Software Assurance Research Program (SARP) has provided funds to NASA IV&V to extend the work performed at the Workshop session in partnership with NASA's Jet Propulsion Laboratory (JPL). NASA IV&V will extract FM architectures across the IV&V portfolio and evaluate the data set, assess visibility for validation and test, and define software assurance methods that could be applied to the various architectures and designs. This SARP initiative focuses efforts on FM architectures from critical and complex projects within NASA. The identification of particular FM architectures and associated V&V/IV&V techniques provides a data set that can enable improved assurance that a system will adequately detect and respond to adverse conditions. Ultimately, results from this activity will be incorporated into the NASA Fault Management Handbook providing dissemination across NASA, other agencies and the space community. This paper discusses the approach taken to perform the evaluations and preliminary findings from the research.
Fault Management Architectures and the Challenges of Providing Software Assurance
NASA Technical Reports Server (NTRS)
Savarino, Shirley; Fitz, Rhonda; Fesq, Lorraine; Whitman, Gerek
2015-01-01
The satellite systems Fault Management (FM) is focused on safety, the preservation of assets, and maintaining the desired functionality of the system. How FM is implemented varies among missions. Common to most is system complexity due to a need to establish a multi-dimensional structure across hardware, software and operations. This structure is necessary to identify and respond to system faults, mitigate technical risks and ensure operational continuity. These architecture, implementation and software assurance efforts increase with mission complexity. Because FM is a systems engineering discipline with a distributed implementation, providing efficient and effective verification and validation (VV) is challenging. A breakout session at the 2012 NASA Independent Verification Validation (IVV) Annual Workshop titled VV of Fault Management: Challenges and Successes exposed these issues in terms of VV for a representative set of architectures. NASA's IVV is funded by NASA's Software Assurance Research Program (SARP) in partnership with NASA's Jet Propulsion Laboratory (JPL) to extend the work performed at the Workshop session. NASA IVV will extract FM architectures across the IVV portfolio and evaluate the data set for robustness, assess visibility for validation and test, and define software assurance methods that could be applied to the various architectures and designs. This work focuses efforts on FM architectures from critical and complex projects within NASA. The identification of particular FM architectures, visibility, and associated VVIVV techniques provides a data set that can enable higher assurance that a satellite system will adequately detect and respond to adverse conditions. Ultimately, results from this activity will be incorporated into the NASA Fault Management Handbook providing dissemination across NASA, other agencies and the satellite community. This paper discusses the approach taken to perform the evaluations and preliminary findings from the research including identification of FM architectures, visibility observations, and methods utilized for VVIVV.
V&V of Fault Management: Challenges and Successes
NASA Technical Reports Server (NTRS)
Fesq, Lorraine M.; Costello, Ken; Ohi, Don; Lu, Tiffany; Newhouse, Marilyn
2013-01-01
This paper describes the results of a special breakout session of the NASA Independent Verification and Validation (IV&V) Workshop held in the fall of 2012 entitled "V&V of Fault Management: Challenges and Successes." The NASA IV&V Program is in a unique position to interact with projects across all of the NASA development domains. Using this unique opportunity, the IV&V program convened a breakout session to enable IV&V teams to share their challenges and successes with respect to the V&V of Fault Management (FM) architectures and software. The presentations and discussions provided practical examples of pitfalls encountered while performing V&V of FM including the lack of consistent designs for implementing faults monitors and the fact that FM information is not centralized but scattered among many diverse project artifacts. The discussions also solidified the need for an early commitment to developing FM in parallel with the spacecraft systems as well as clearly defining FM terminology within a project.
Boatwright, John; Jacobson, Muriel L.
1982-01-01
The strong ground motions radiated by earthquake faulting are controlled by the dynamic characteristics of the faulting process. Although this assertion seems self-evident, seismologists have only recently begun to derive and test quantitative relations between common measures of strong ground motion and the dynamic characteristics of faulting. Interest in this problem has increased dramatically in past several years, however, resulting in a number of important advances. The research presented in this workshop is a significant part of this scientific development. Watching this development occur through the work of many scientists is exciting; to be able to gather a number of these scientists together in one workshop is a remarkable opportunity.
Crone, Anthony J.; Haller, Kathleen M.; Maharrey, Joseph Z.
2009-01-01
The U.S. Geological Survey's (USGS) Earthquake Hazards Program (EHP) has the responsibility to provide nationwide information and knowledge about earthquakes and earthquake hazards as a step to mitigating earthquake-related losses. As part of this mission, USGS geologists and geophysicists continue to study faults and structures that have the potential to generate large and damaging earthquakes. In addition, the EHP, through its External Grants Program (hereinafter called Program), supports similar studies by scientists employed by state agencies, academic institutions, and independent employers. For the purposes of earthquake hazard investigations, the Nation is geographically subdivided into tectonic regions. One such region is the Intermountain West (IMW), which here is broadly defined as starting at the eastern margin of the Rocky Mountains in New Mexico, Colorado, Wyoming, and Montana and extending westward to the east side of the Sierra Nevada mountains in eastern California and into the Basin and Range-High Plateaus of eastern Oregon and Washington. The IMW contains thousands of faults that have moved in Cenozoic time, hundreds of which have evidence of Quaternary movement, and thus are considered to be potential seismic sources. Ideally, each Quaternary fault should be studied in detail to evaluate its rate of activity in order to model the hazard it poses. The study of a single fault requires a major commitment of time and resources, and given the large number of IMW faults that ideally should be studied, it is impractical to expect that all IMW Quaternary faults can be fully evaluated in detail. A more realistic approach is to prioritize a list of IMW structures that potentially pose a significant hazard and to focus future studies on those structures. Accordingly, in June 2008, a two-day workshop was convened at the USGS offices in Golden, Colorado, to seek information from representatives of selected State Geological Surveys in the IMW and with knowledgeable regional experts to identify the important structures for future studies. Such a priority list allows Program managers to guide the limited resources toward studies of features that are deemed to potentially pose the most serious hazards in the IMW. It also provides the scientific community with a list of structures to investigate because they are deemed to pose a substantial hazard to population centers or critical structures. The IMW encompasses all or large parts of 12 states, including Arizona, New Mexico, extreme west Texas, Colorado, Utah, Nevada, eastern California, eastern Oregon, eastern Washington, Idaho, western Wyoming, and western Montana. In Utah, and more recently in Nevada, geoscientists have taken steps to evaluate geologic data related to well-studied faults and to develop a statewide priority list of hazardous structures. In contrast to Utah and Nevada, the other IMW states contain substantially fewer Quaternary faults, so there have not been any previous efforts to develop similar priority lists. This workshop was organized to address this matter and create a more balanced perspective of priorities throughout the entire IMW region. Because working groups and workshops had already been convened to specifically deal with Quaternary fault priorities in Utah and Nevada, this workshop specifically emphasized structures outside of these two states.
Structural Analysis of the Pärvie Fault in Northern Scandinavia
NASA Astrophysics Data System (ADS)
Baeckstroem, A.; Rantakokko, N.; Ask, M. V.
2011-12-01
The Pärvie fault is the largest known postglacial fault in the world with a length of about 160 km. The structure has a dominating fault scarp as its western perimeter but in several locations it is rather a system of several faults. The current fault scarps, mainly caused by reverse faulting, are on average, 10-15 m in height and are thought to have been formed during one momentous event near the end of the latest glaciation (the Weichselian, 9,500-115,000 BP ) (Lagerbäck & Sundh, 2008). This information has been learnt from studying deformation features in sediments from the latest glaciation. However, the fault is believed to have been formed as early as the Precambrian, and it has been reactivated repeatedly throughout its history. The earlier history of this fault zone is still largely unknown. Here we present a pre-study to the scientific drilling project "Drilling Active Faults in Northern Europe", that was submitted to the International Continental Scientific Drilling Program (ICDP) in 2009 (Kukkonen et al. 2010) with an ICDP-sponsored workshop in 2010 (Kukkonen et al. 2011). During this workshop a major issue to be addressed before the start of drilling was to reveal whether the fault scarps were formed by one big earthquake or by several small ones (Kukkonen et al. 2011). Initial results from a structural analysis by Riad (1990) have produced information of the latest kinematic event where it is suggested that the latest event coincides with the recent stress field, causing a transpressional effect. The geometrical model suggested for an extensive area of several fault scarps along the structure is the compressive tulip structure. In the southern part, where the fault dips steeply E, the structure is parallel to the foliation of the country rock and earlier breccias, thus indicating a dependence of earlier structures. Modelling of the stress field during the latest glaciation show that a reverse background stress field together with excess pore pressure governs the destabilization of a structure, such as the Pärvie fault, rather than the induced stresses from the weight of ice-sheet (Lund, 2005). This is a presentation of the first part of the structural analysis of the brittle structures around the Pärvie fault in order to evaluate its brittle deformation history and to attempt to constrain the paleostress fields causing these deformations. References Kukkonen, I.T., Olesen, O., Ask, M.V.S., and the PFDP Working Group, 2010. Postglacial faults in Fennoscandia: targets for scientific drilling. GFF, 132:71-81. Kukkonen, I.T., Ask, M.V.S., Olesen, O., 2011. Postglacial Fault Drilling in Northern Europe: Workshop in Skokloster, Sweden. Scientific Drilling, 11, doi:10.2204/iodp.sd.11.08.2011. Lagerbäck, R. & Sundh, M., 2008. Early Holocene faulting and paleoseismicity in northern Sweden. Geological survey of Sweden. Research paper, C 836. 80 p. Lund, B., Schmidt, P., Hieronymus, C., 2009. Stress evolution and fault stability during the Weichselian glacial cycle. Swedish Nuclear Fuel and Waste Management Co., Stockholm. TR-09-15. 106 p. Riad, L., 1990. The Pärvie fault, Northern Sweden, Uppsala University. Research report 63. 48 p
Adaptive Fault-Resistant Systems
1994-10-01
An Architectural Overview of the Alpha Real-Time Distributed Kernel . In Proceeding., of the USEN[X Workshop on Microkernels and Other Kernel ...system and the controller are monolithic . We have noted earlier some of the problems of distributed systems-for exam- ple, the need to bound the...are monolithic . In practice, designers employ a layered structuring for their systems in order to manage complexity, and we expect that practical
Drilling to investigate processes in active tectonics and magmatism
NASA Astrophysics Data System (ADS)
Shervais, J.; Evans, J.; Toy, V.; Kirkpatrick, J.; Clarke, A.; Eichelberger, J.
2014-12-01
Coordinated drilling efforts are an important method to investigate active tectonics and magmatic processes related to faults and volcanoes. The US National Science Foundation (NSF) recently sponsored a series of workshops to define the nature of future continental drilling efforts. As part of this series, we convened a workshop to explore how continental scientific drilling can be used to better understand active tectonic and magmatic processes. The workshop, held in Park City, Utah, in May 2013, was attended by 41 investigators from seven countries. Participants were asked to define compelling scientific justifications for examining problems that can be addressed by coordinated programs of continental scientific drilling and related site investigations. They were also asked to evaluate a wide range of proposed drilling projects, based on white papers submitted prior to the workshop. Participants working on faults and fault zone processes highlighted two overarching topics with exciting potential for future scientific drilling research: (1) the seismic cycle and (2) the mechanics and architecture of fault zones. Recommended projects target fundamental mechanical processes and controls on faulting, and range from induced earthquakes and earthquake initiation to investigations of detachment fault mechanics and fluid flow in fault zones. Participants working on active volcanism identified five themes: the volcano eruption cycle; eruption sustainability, near-field stresses, and system recovery; eruption hazards; verification of geophysical models; and interactions with other Earth systems. Recommended projects address problems that are transferrable to other volcanic systems, such as improved methods for identifying eruption history and constraining the rheological structure of shallow caldera regions. Participants working on chemical geodynamics identified four major themes: large igneous provinces (LIPs), ocean islands, continental hotspot tracks and rifts, and convergent plate margins (subduction zones). This workshop brought together a diverse group of scientists with a broad range of scientific experience and interests. A particular strength was the involvement of both early-career scientists, who will initiate and carry out these new research programs, and more senior researchers with many years of experience in scientific drilling and active tectonics research. Each of the themes and questions outlined above has direct benefits to society, including improving hazard assessment, direct monitoring of active systems for early warning, renewable and non-renewable resource and energy exploitation, and predicting the environmental impacts of natural hazards, emphasizing the central role that scientific drilling will play in future scientific and societal developments.
The Development of NASA's Fault Management Handbook
NASA Technical Reports Server (NTRS)
Fesq, Lorraine
2011-01-01
Disciplined approach to Fault Management (FM) has not always been emphasized by projects, contributing to major schedule and cost overruns: (1) Often faults aren't addressed until nominal spacecraft design is fairly stable. (2) Design relegated to after-the-fact patchwork, Band-Aid approach. Progress is being made on a number of fronts outside of Handbook effort: (1) Processes, Practices and Tools being developed at some Centers and Institutions (2) Management recognition. Constellation FM roles, Discovery/New Frontiers mission reviews (3) Potential Technology solutions. New approaches could avoid many current pitfalls (3a) New FM architectures, including model-based approach integrated with NASA's MBSE (Model-Based System Engineering) efforts (3b) NASA's Office of the Chief Technologist: FM identified in seven of NASA's 14 Space Technology Roadmaps. Opportunity to coalesce and establish thrust area to progressively develop new FM techniques. FM Handbook will help ensure that future missions do not encounter same FM-related problems as previous missions. Version 1 of the FM Handbook is a good start: (1) Still need Version 2 Agency-wide FM Handbook to expand Handbook to other areas, especially crewed missions. (2) Still need to reach out to other organizations to develop common understanding and vocabulary. Handbook doesn't/can't address all Workshop recommendations. Still need to identify how to address programmatic and infrastructure issues.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2016-06-15
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 differentmore » clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.« less
NASA Technical Reports Server (NTRS)
1988-01-01
A user's workshop for CARE 3, a reliability assessment tool designed and developed especially for the evaluation of high reliability fault tolerant digital systems, was held at NASA Langley Research Center on October 6 to 7, 1987. The main purpose of the workshop was to assess the evolutionary status of CARE 3. The activities of the workshop are documented and papers are included by user's of CARE 3 and NASA. Features and limitations of CARE 3 and comparisons to other tools are presented. The conclusions to a workshop questionaire are also discussed.
Scientific Exploration of Induced SeisMicity and Stress (SEISMS)
NASA Astrophysics Data System (ADS)
Savage, Heather M.; Kirkpatrick, James D.; Mori, James J.; Brodsky, Emily E.; Ellsworth, William L.; Carpenter, Brett M.; Chen, Xiaowei; Cappa, Frédéric; Kano, Yasuyuki
2017-11-01
Several major fault-drilling projects have captured the interseismic and postseismic periods of earthquakes. However, near-field observations of faults immediately before and during an earthquake remain elusive due to the unpredictable nature of seismicity. The Scientific Exploration of Induced SeisMicity and Stress (SEISMS) workshop met in March 2017 to discuss the value of a drilling experiment where a fault is instrumented in advance of an earthquake induced through controlled fluid injection. The workshop participants articulated three key issues that could most effectively be addressed by such an experiment: (1) predictive understanding of the propensity for seismicity in reaction to human forcing, (2) identification of earthquake nucleation processes, and (3) constraints on the factors controlling earthquake size. A systematic review of previous injection experiments exposed important observational gaps in all of these areas. The participants discussed the instrumentation and technological needs as well as faults and tectonic areas that are feasible from both a societal and scientific standpoint.
CO2 Push-Pull Single Fault Injection Simulations
Borgia, Andrea; Oldenburg, Curtis (ORCID:0000000201326016); Zhang, Rui; Pan, Lehua; Daley, Thomas M.; Finsterle, Stefan; Ramakrishnan, T.S.; Doughty, Christine; Jung, Yoojin; Lee, Kyung Jae; Altundas, Bilgin; Chugunov, Nikita
2017-09-21
ASCII text files containing grid-block name, X-Y-Z location, and multiple parameters from TOUGH2 simulation output of CO2 injection into an idealized single fault representing a dipping normal fault at the Desert Peak geothermal field (readable by GMS). The fault is composed of a damage zone, a fault gouge and a slip plane. The runs are described in detail in the following: Borgia A., Oldenburg C.M., Zhang R., Jung Y., Lee K.J., Doughty C., Daley T.M., Chugunov N., Altundas B, Ramakrishnan T.S., 2017. Carbon Dioxide Injection for Enhanced Characterization of Faults and Fractures in Geothermal Systems. Proceedings of the 42st Workshop on Geothermal Reservoir Engineering, Stanford University, Stanford, California, February 13-17.
Proceedings of the Twenty-Third Annual Software Engineering Workshop
NASA Technical Reports Server (NTRS)
1999-01-01
The Twenty-third Annual Software Engineering Workshop (SEW) provided 20 presentations designed to further the goals of the Software Engineering Laboratory (SEL) of the NASA-GSFC. The presentations were selected on their creativity. The sessions which were held on 2-3 of December 1998, centered on the SEL, Experimentation, Inspections, Fault Prediction, Verification and Validation, and Embedded Systems and Safety-Critical Systems.
TH-EF-BRC-03: Fault Tree Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomadsen, B.
2016-06-15
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 differentmore » clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.« less
TH-EF-BRC-04: Quality Management Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yorke, E.
2016-06-15
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 differentmore » clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Busbey, A.B.
Seismic Processing Workshop, a program by Parallel Geosciences of Austin, TX, is discussed in this column. The program is a high-speed, interactive seismic processing and computer analysis system for the Apple Macintosh II family of computers. Also reviewed in this column are three products from Wilkerson Associates of Champaign, IL. SubSide is an interactive program for basin subsidence analysis; MacFault and MacThrustRamp are programs for modeling faults.
MEVTV Workshop on Tectonic Features on Mars
NASA Technical Reports Server (NTRS)
Watters, Thomas R. (Editor); Golombek, Matthew P. (Editor)
1989-01-01
The state of knowledge of tectonic features on Mars was determined and kinematic and mechanical models were assessed for their origin. Three sessions were held: wrinkle ridges and compressional structure; strike-slip faults; and extensional structures. Each session began with an overview of the features under discussion. In the case of wrinkle ridges and extensional structures, the overview was followed by keynote addresses by specialists working on similar structures on the Earth. The first session of the workshop focused on the controversy over the relative importance of folding, faulting, and intrusive volcanism in the origin of wrinkle ridges. The session ended with discussions of the origin of compressional flank structures associated with Martian volcanoes and the relationship between the volcanic complexes and the inferred regional stress field. The second day of the workshop began with the presentation and discussion of evidence for strike-slip faults on Mars at various scales. In the last session, the discussion of extensional structures ranged from the origin of grabens, tension cracks, and pit-crater chains to the origin of Valles Marineris canyons. Shear and tensile modes of brittle failure in the formation of extensional features and the role of these failure modes in the formation of pit-crater chains and the canyons of Valles Marineris were debated. The relationship of extensional features to other surface processes, such as carbonate dissolution (karst) were also discussed.
NASA Technical Reports Server (NTRS)
1986-01-01
Topics addressed include: greenstone belt tectonics, thermal constaints, geological structure, rock components, crustal accretion model, geological evolution, synsedimentary deformation, Archean structures and geological faults.
PREFACE: 12th European Workshop on Advanced Control and Diagnosis (ACD 2015)
NASA Astrophysics Data System (ADS)
Straka, Ondřej; Punčochář, Ivo; Duník, Jindřich
2015-11-01
The 12th European Workshop on Advanced Control and Diagnosis (ACD 2015) took place at the Research Centre NTIS - New Technologies for the Information Society, Faculty of Applied Sciences, University of West Bohemia, Pilsen, Czech Republic, on November 19 - 20, 2015. The annual European Workshop on Advanced Control and Diagnosis has been organized since 2003 by Control Engineering departments of several European universities in Germany, France, the UK, Poland, Italy, Hungary, and Denmark to bring together senior and junior academics and engineers from diverse fields of automatic control, fault detection, and signal processing. The workshop provides an opportunity for researchers and developers to present their recent theoretical developments, practical applications, or even open problems. It also offers a great opportunity for industrial partners to express their needs and priorities and to review the current activities in the fields. A total of 74 papers have been submitted for ACD 2015. Based on the peer reviews 48 papers were accepted for the oral presentation and 10 papers for the poster presentation. The accepted papers covered areas of control theory and applications, identification, estimation, signal processing, and fault detection. In addition, four excellent plenary lectures were delivered by Prof. Fredrik Gustafsson (Automotive Sensor Mining for Tire Pressure Monitoring), Prof. Vladimír Havlena (Advanced Process Control for Energy Efficiency), Prof. Silvio Simani (Advanced Issues on Wind Turbine Modelling and Control), and Prof. Robert Babuška (Learning Control in Robotics). The ACD 2015 was for the first time in the workshop history co-sponsored by the International Federation of Automatic Control (IFAC). On behalf of the ACD 2015 organising committee, we would like to thank all those who prepared and submitted papers, participated in the peer review process, supported, and attended the workshop.
PREFACE: European Workshop on Advanced Control and Diagnosis
NASA Astrophysics Data System (ADS)
Schulte, Horst; Georg, Sören
2014-12-01
The European Workshop on Advanced Control and Diagnosis is an annual event that has been organised since 2003 by Control Engineering departments of several European universities in Germany, France, the UK, Poland, Italy, Hungary and Denmark. The overall planning of the workshops is conducted by the Intelligent Control and Diagnosis (ICD) steering committee. This year's ACD workshop took place at HTW Berlin (University of Applied Sciences) and was organised by the Control Engineering group of School of Engineering I of HTW Berlin. 38 papers were presented at ACD 2014, with contributions spanning a variety of fields in modern control science: Discrete control, nonlinear control, model predictive control, system identification, fault diagnosis and fault-tolerant control, control applications, applications of fuzzy logic, as well as modelling and simulation, the latter two forming a basis for all tasks in modern control. Three interesting and high-quality plenary lectures were delivered. The first plenary speaker was Wolfgang Weber from Pepperl+Fuchs, a German manufacturer of state-of-the-art industrial sensors and process interfaces. The second and third plenary speakers were two internationally high-ranked researchers in their respective fields, Prof. Didier Theilliol from Université de Lorraine and Prof. Carsten Scherer from Universität Stuttgart. Taken together, the three plenary lectures sought to contribute to closing the gap between theory and applications. On behalf of the whole ACD 2014 organising committee, we would like to thank all those who submitted papers and participated in the workshop. We hope it was a fruitful and memorable event for all. Together we are looking forward to the next ACD workshop in 2015 in Pilsen, Czech Republic. Horst Schulte (General Chair), Sören Georg (Programme Chair)
Fault Tolerant Real-Time Networks
2007-05-30
Alberto Sangiovanni-Vincentelli, editors Hybrid Systems: Computation and Control. Fourth International Workshop (HSCC, Rome, Italy, March 2001...average dwell time by solving optimization problems. In Ashish Tiwari and Joao P. Hespanha, editors, Hybrid Systems: Computation and Control (HSCC 06
Proceedings of the Sixth NASA Langley Formal Methods (LFM) Workshop
NASA Technical Reports Server (NTRS)
Rozier, Kristin Yvonne (Editor)
2008-01-01
Today's verification techniques are hard-pressed to scale with the ever-increasing complexity of safety critical systems. Within the field of aeronautics alone, we find the need for verification of algorithms for separation assurance, air traffic control, auto-pilot, Unmanned Aerial Vehicles (UAVs), adaptive avionics, automated decision authority, and much more. Recent advances in formal methods have made verifying more of these problems realistic. Thus we need to continually re-assess what we can solve now and identify the next barriers to overcome. Only through an exchange of ideas between theoreticians and practitioners from academia to industry can we extend formal methods for the verification of ever more challenging problem domains. This volume contains the extended abstracts of the talks presented at LFM 2008: The Sixth NASA Langley Formal Methods Workshop held on April 30 - May 2, 2008 in Newport News, Virginia, USA. The topics of interest that were listed in the call for abstracts were: advances in formal verification techniques; formal models of distributed computing; planning and scheduling; automated air traffic management; fault tolerance; hybrid systems/hybrid automata; embedded systems; safety critical applications; safety cases; accident/safety analysis.
Flight elements: Fault detection and fault management
NASA Technical Reports Server (NTRS)
Lum, H.; Patterson-Hine, A.; Edge, J. T.; Lawler, D.
1990-01-01
Fault management for an intelligent computational system must be developed using a top down integrated engineering approach. An approach proposed includes integrating the overall environment involving sensors and their associated data; design knowledge capture; operations; fault detection, identification, and reconfiguration; testability; causal models including digraph matrix analysis; and overall performance impacts on the hardware and software architecture. Implementation of the concept to achieve a real time intelligent fault detection and management system will be accomplished via the implementation of several objectives, which are: Development of fault tolerant/FDIR requirement and specification from a systems level which will carry through from conceptual design through implementation and mission operations; Implementation of monitoring, diagnosis, and reconfiguration at all system levels providing fault isolation and system integration; Optimize system operations to manage degraded system performance through system integration; and Lower development and operations costs through the implementation of an intelligent real time fault detection and fault management system and an information management system.
Managing Space System Faults: Coalescing NASA's Views
NASA Technical Reports Server (NTRS)
Muirhead, Brian; Fesq, Lorraine
2012-01-01
Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.
An Assessment of Integrated Health Management (IHM) Frameworks
DOE Office of Scientific and Technical Information (OSTI.GOV)
N. Lybeck; M. Tawfik; L. Bond
In order to meet the ever increasing demand for energy, the United States nuclear industry is turning to life extension of existing nuclear power plants (NPPs). Economically ensuring the safe, secure, and reliable operation of aging nuclear power plants presents many challenges. The 2009 Light Water Reactor Sustainability Workshop identified online monitoring of active and structural components as essential to the better understanding and management of the challenges posed by aging nuclear power plants. Additionally, there is increasing adoption of condition-based maintenance (CBM) for active components in NPPs. These techniques provide a foundation upon which a variety of advanced onlinemore » surveillance, diagnostic, and prognostic techniques can be deployed to continuously monitor and assess the health of NPP systems and components. The next step in the development of advanced online monitoring is to move beyond CBM to estimating the remaining useful life of active components using prognostic tools. Deployment of prognostic health management (PHM) on the scale of a NPP requires the use of an integrated health management (IHM) framework - a software product (or suite of products) used to manage the necessary elements needed for a complete implementation of online monitoring and prognostics. This paper provides a thoughtful look at the desirable functions and features of IHM architectures. A full PHM system involves several modules, including data acquisition, system modeling, fault detection, fault diagnostics, system prognostics, and advisory generation (operations and maintenance planning). The standards applicable to PHM applications are indentified and summarized. A list of evaluation criteria for PHM software products, developed to ensure scalability of the toolset to an environment with the complexity of a NPP, is presented. Fourteen commercially available PHM software products are identified and classified into four groups: research tools, PHM system development tools, deployable architectures, and peripheral tools.« less
Fault management for data systems
NASA Technical Reports Server (NTRS)
Boyd, Mark A.; Iverson, David L.; Patterson-Hine, F. Ann
1993-01-01
Issues related to automating the process of fault management (fault diagnosis and response) for data management systems are considered. Substantial benefits are to be gained by successful automation of this process, particularly for large, complex systems. The use of graph-based models to develop a computer assisted fault management system is advocated. The general problem is described and the motivation behind choosing graph-based models over other approaches for developing fault diagnosis computer programs is outlined. Some existing work in the area of graph-based fault diagnosis is reviewed, and a new fault management method which was developed from existing methods is offered. Our method is applied to an automatic telescope system intended as a prototype for future lunar telescope programs. Finally, an application of our method to general data management systems is described.
Progressive Tinnitus Management Level 3 Skills Education: A 5-Year Clinical Retrospective.
Edmonds, Catherine M; Ribbe, Cheri; Thielman, Emily J; Henry, James A
2017-09-18
The primary purpose of this study was to determine whether progressive tinnitus management Level 3 skills education workshops conducted at the Bay Pines and Boston Veterans Affairs hospitals result in consistent use of the presented tinnitus management strategies by patients 1-5 years after completing the workshops. In fiscal year (FY) 2015, the tinnitus workshop follow-up form was mailed to all veterans who completed the Level 3 workshops between FY 2010 and FY 2014. Data were compiled to determine which, if any, of the skills taught in the workshops were being used 1-5 years after completion of the workshops and the impact on quality-of-life indicators. All self-management skills were being utilized up to 5 years postcompletion; therapeutic sound was utilized the most. The majority of patients reported an improved ability to manage reactions to tinnitus and improved quality-of-life indicators. Over 90% of patients from both sites recommended the program to others with tinnitus. The self-management skills taught in the progressive tinnitus management Level 3 workshops are sustained over time even when limited resources prevent the full complement of workshops or the involvement of mental health services. The workshops can also be successfully implemented through remote delivery via videoconferencing (telehealth). https://doi.org/10.23641/asha.5370883.
San Andreas drilling sites selected
NASA Astrophysics Data System (ADS)
Ellsworth, Bill; Zoback, Mark
A new initiative for drilling and coring directly into the San Andreas fault at depths up to 10 km is being proposed by an international team of scientists led by Mark Zoback, Stanford University; Steve Hickman and Bill Ellsworth, U.S. Geological Survey; and Lee Younker, Lawrence Livermore Laboratory. In addition to exhuming samples of fault rock and fluids from seismogenic depths, the hole will be used to make a wide range of geophysical measurements within the fault zone and to monitor the fault zone over time. Four areas along the San Andreas have been selected as candidates for deep drilling: the Mojave segment of the San Andreas between Leona Valley and Big Pine, the Carrizo Plain, the San Francisco Peninsula between Los Altos and Daly City, and the Northern Gabilan Range between the Cienga winery and Melendy Ranch. These sites were chosen from an initial list compiled at the International Fault Zone Drilling Workshop held in Asilomar, Calif., in December 1992 and at meetings held this winter and spring in Menlo Park, Calif.
Corridor management and preservation in Texas : 2010 workshops
DOT National Transportation Integrated Search
2010-01-01
2007 RMC Project 05606 : Report 56061, Creating Partnerships with Local Communities to Manage and Preserve Corridors Basis for Workshop; 5606P1, Guidelines on Corridor Management and Preservation; 5606S, Summary Report. Workshop is an ...
NASA Technical Reports Server (NTRS)
Johnson, Stephen B.; Ghoshal, Sudipto; Haste, Deepak; Moore, Craig
2017-01-01
This paper describes the theory and considerations in the application of metrics to measure the effectiveness of fault management. Fault management refers here to the operational aspect of system health management, and as such is considered as a meta-control loop that operates to preserve or maximize the system's ability to achieve its goals in the face of current or prospective failure. As a suite of control loops, the metrics to estimate and measure the effectiveness of fault management are similar to those of classical control loops in being divided into two major classes: state estimation, and state control. State estimation metrics can be classified into lower-level subdivisions for detection coverage, detection effectiveness, fault isolation and fault identification (diagnostics), and failure prognosis. State control metrics can be classified into response determination effectiveness and response effectiveness. These metrics are applied to each and every fault management control loop in the system, for each failure to which they apply, and probabilistically summed to determine the effectiveness of these fault management control loops to preserve the relevant system goals that they are intended to protect.
75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...
Simulation game provides financial management training.
Uhles, Neville; Weimer-Elder, Barbette; Lee, James G
2008-01-01
Adventist HealthCare developed a workshop with a reality simulation game as an engaging means to teach nonfinancial managers about the relationships between cash flow, income statements, and balance sheets. Thirty AHC staff, about half financial and half nonfinancial, were trained as workshop facilitators, and all managers with budget oversight were asked to complete the workshop. The workshop was very positively received; participants' average scores on workshop questionnaires increased from 77.4 percent correct on a presession questionnaire to 91.3 percent correct on a postsession questionnaire.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huq, M.
2016-06-15
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 differentmore » clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunscombe, P.
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 differentmore » clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.« less
NASA Technical Reports Server (NTRS)
Rogers, William H.
1993-01-01
In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.
Proceedings of the Urban Sustainability Assessment and Management Workshop
The U.S. Environmental Protection Agency’s Office of Research and Development’s workshop entitled, “Urban Sustainability Assessment and Management Workshop,” occurred in Chicago, Illinois on July 20 and 21, 2016. The purpose of the workshop was to examine critical challenges face...
Fly-By-Light/Power-By-Wire Requirements and Technology Workshop
NASA Technical Reports Server (NTRS)
Baker, Robert L. (Editor); Pitts, Felix L. (Editor)
1992-01-01
The results of the Fly-By-Light/Power-By-Wire (FBL/PBW) Workshop held on March 17-19, 1992, at the NASA Langley Research Center are presented. The FBL/PBW program is a joint NASA LeRC/LaRC effort to develop the technology base for confident application of integrated FBL/PBW systems to transport aircraft. The objectives of the workshop were to ascertain the FBL/PBW program technical requirements and satisfy the requirements and needs from the industry viewpoint, provide a forum for presenting and documenting alternative technical approaches which satisfy the requirements, and assess the plan adequacy in accomplishing plan objectives, aims, and technology transfer. Areas addressed were: optical sensor systems, power-by-wire systems, FBL/PBW fault-tolerant architectures, electromagnetic environment assessment, and system integration and demonstration. The workshop consisted of an introductory meeting, a 'keynote' presentation, a series of individual panel sessions covering the above areas, with midway presentations by the panel chairpersons, followed by a final summarizing/integrating session by the individual panels, and a closing plenary session summarizing the results of the workshop.
The Assessment and Management of Suicide Risk: State of Workshop Education
ERIC Educational Resources Information Center
Pisani, Anthony R.; Cross, Wendi F.; Gould, Madelyn S.
2011-01-01
A systematic search of popular and scholarly databases identified workshops that addressed general clinical competence in the assessment or management of suicide risk, targeted mental health professionals, and had at least one peer-reviewed publication. We surveyed workshop developers and examined empirical articles associated with each workshop.…
Google Earth for Landowners: Insights from Hands-on Workshops
ERIC Educational Resources Information Center
Huff, Tristan
2014-01-01
Google Earth is an accessible, user-friendly GIS that can help landowners in their management planning. I offered hands-on Google Earth workshops to landowners to teach skills, including mapmaking, length and area measurement, and database management. Workshop participants were surveyed at least 6 months following workshop completion, and learning…
EFFECTIVE RISK MANAGEMENT OF ENDOCRINE DISRUPTING CHEMICALS WORKSHOP NEWMEDIA CD
This product is a CD-ROM version of the workshop, Effective Risk Management of Endocrine Disrupting Chemicals, held in January 2002, in Cincinnati, Ohio. The goal of this workshop was to introduce the science and engineering behind managing the potential risk of suspected endocri...
Paleohydrology Workshops for Water Resource Managers Using an Iterative Evaluation Process
NASA Astrophysics Data System (ADS)
Woodhouse, C.; Lukas, J.
2008-12-01
Workshops can be an effective avenue for the exchange of information and ideas between scientists and decision-makers. The interactive aspects of workshops promote more active participation and interactions between the two groups. In 2006, at the suggestion of water resource managers, we began presenting a series of small workshops (10-25 participants) on the use and application of tree-ring data in water resource management. The one-day workshops cover the basic science behind tree-ring reconstructions of hydrology, resources available, and applications of the data to resource management, with presentations by both tree-ring scientists and water resource professionals. They also include plenty of time for informal discussion. We have now held ten workshops across the western U.S., and several more are planned. We use pre-workshop surveys to tailor the workshop to the needs of the participants, and we assess the workshop's effectiveness through participant evaluations completed at the end of the workshop. We also receive post-workshop feedback in the form of follow-up emails or via word of mouth. This iterative process of evaluation, with each workshop, has enabled us to fine-tune the format and content of the workshops and respond to additional needs such as data, web resources, online tools for using paleodata, as well as follow-up workshops. This approach has resulted in an improvement in the credibility, acceptance, and use of tree-ring data in water resource applications, as evidenced by an independent survey of workshop participants. Although the focus of these workshops has been on paleohydrologic data, this approach would be applicable to other climate-stakeholder issues as well.
NASA Astrophysics Data System (ADS)
Dalguer, Luis A.; Fukushima, Yoshimitsu; Irikura, Kojiro; Wu, Changjiang
2017-09-01
Inspired by the first workshop on Best Practices in Physics-Based Fault Rupture Models for Seismic Hazard Assessment of Nuclear Installations (BestPSHANI) conducted by the International Atomic Energy Agency (IAEA) on 18-20 November, 2015 in Vienna (http://www-pub.iaea.org/iaeameetings/50896/BestPSHANI), this PAGEOPH topical volume collects several extended articles from this workshop as well as several new contributions. A total of 17 papers have been selected on topics ranging from the seismological aspects of earthquake cycle simulations for source-scaling evaluation, seismic source characterization, source inversion and ground motion modeling (based on finite fault rupture using dynamic, kinematic, stochastic and empirical Green's functions approaches) to the engineering application of simulated ground motion for the analysis of seismic response of structures. These contributions include applications to real earthquakes and description of current practice to assess seismic hazard in terms of nuclear safety in low seismicity areas, as well as proposals for physics-based hazard assessment for critical structures near large earthquakes. Collectively, the papers of this volume highlight the usefulness of physics-based models to evaluate and understand the physical causes of observed and empirical data, as well as to predict ground motion beyond the range of recorded data. Relevant importance is given on the validation and verification of the models by comparing synthetic results with observed data and empirical models.
Ali, Sheila; Chalder, Trudie; Madan, Ira
2014-01-01
Background Disabling fatigue is common in the working age population. It is essential that occupational health (OH) professionals are up-to-date with the management of fatigue in order to reduce the impact of fatigue on workplace productivity. Our aim was to evaluate the impact of one-day workshops on OH professionals' knowledge of fatigue and chronic fatigue syndrome (CFS), and their confidence in diagnosing and managing these in a working population. Methods Five interactive problem-based workshops were held in the United Kingdom. These workshops were developed and delivered by experts in the field. Questionnaires were self-administered immediately prior to, immediately after, and 4 months following each workshop. Questionnaires included measures of satisfaction, knowledge of fatigue and CFS, and confidence in diagnosing and managing fatigue. Open-ended questions were used to elicit feedback about the workshops. Results General knowledge of fatigue increased significantly after training (with a 25% increase in the median score). Participants showed significantly higher levels of confidence in diagnosing and managing CFS (with a 62.5% increase in the median score), and high scores were maintained 4 months after the workshops. OH physicians scored higher on knowledge and confidence than nurses. Similarly, thematic analysis revealed that participants had increased knowledge and confidence after attending the workshops. Conclusion Fatigue can lead to severe functional impairment with adverse workplace outcomes. One-day workshops can be effective in training OH professionals in how to diagnose and manage fatigue and CFS. Training may increase general knowledge of fatigue and confidence in fatigue management in an OH setting. PMID:25516811
Stepp, J.C.; Wong, I.; Whitney, J.; Quittmeyer, R.; Abrahamson, N.; Toro, G.; Young, S.R.; Coppersmith, K.; Savy, J.; Sullivan, T.
2001-01-01
Probabilistic seismic hazard analyses were conducted to estimate both ground motion and fault displacement hazards at the potential geologic repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The study is believed to be the largest and most comprehensive analyses ever conducted for ground-shaking hazard and is a first-of-a-kind assessment of probabilistic fault displacement hazard. The major emphasis of the study was on the quantification of epistemic uncertainty. Six teams of three experts performed seismic source and fault displacement evaluations, and seven individual experts provided ground motion evaluations. State-of-the-practice expert elicitation processes involving structured workshops, consensus identification of parameters and issues to be evaluated, common sharing of data and information, and open exchanges about the basis for preliminary interpretations were implemented. Ground-shaking hazard was computed for a hypothetical rock outcrop at -300 m, the depth of the potential waste emplacement drifts, at the designated design annual exceedance probabilities of 10-3 and 10-4. The fault displacement hazard was calculated at the design annual exceedance probabilities of 10-4 and 10-5.
NASA Technical Reports Server (NTRS)
Rogers, William H.; Schutte, Paul C.
1993-01-01
Advanced fault management aiding concepts for commercial pilots are being developed in a research program at NASA Langley Research Center. One aim of this program is to re-evaluate current design principles for display of fault information to the flight crew: (1) from a cognitive engineering perspective and (2) in light of the availability of new types of information generated by advanced fault management aids. The study described in this paper specifically addresses principles for organizing fault information for display to pilots based on their mental models of fault management.
Orion GN&C Fault Management System Verification: Scope And Methodology
NASA Technical Reports Server (NTRS)
Brown, Denise; Weiler, David; Flanary, Ronald
2016-01-01
In order to ensure long-term ability to meet mission goals and to provide for the safety of the public, ground personnel, and any crew members, nearly all spacecraft include a fault management (FM) system. For a manned vehicle such as Orion, the safety of the crew is of paramount importance. The goal of the Orion Guidance, Navigation and Control (GN&C) fault management system is to detect, isolate, and respond to faults before they can result in harm to the human crew or loss of the spacecraft. Verification of fault management/fault protection capability is challenging due to the large number of possible faults in a complex spacecraft, the inherent unpredictability of faults, the complexity of interactions among the various spacecraft components, and the inability to easily quantify human reactions to failure scenarios. The Orion GN&C Fault Detection, Isolation, and Recovery (FDIR) team has developed a methodology for bounding the scope of FM system verification while ensuring sufficient coverage of the failure space and providing high confidence that the fault management system meets all safety requirements. The methodology utilizes a swarm search algorithm to identify failure cases that can result in catastrophic loss of the crew or the vehicle and rare event sequential Monte Carlo to verify safety and FDIR performance requirements.
Incorporating a Weight Management Skills Workshop in Pharmacy Curricula in Australia
Krass, Ines; Armour, Carol; Gill, Timothy; Chaar, Betty B.
2016-01-01
Objective. To develop, implement, and evaluate a competency-based weight management skills workshop for undergraduate pharmacy students in an Australian university. Design. A 3-hour workshop titled “Weight Management in Pharmacy” was implemented with a cohort of fourth-year undergraduate pharmacy students (n=180). Learning activities used included case-based learning, hands-on experience, role-play, and group discussion. Assessment. A 22-item attitudinal survey instrument and the validated Obesity Risk Knowledge (ORK-10) scale were administered at baseline and postworkshop to evaluate the impact of this educational workshop. There was significant improvement in the students’ ORK scores and students’ perceived level of self-confidence in performing weight management skills. Conclusion. An educational workshop designed to enhance professional competencies in weight management ensured graduates were “service-ready” and had the appropriate knowledge, skills, and attributes to deliver patient-centered pharmacy-based weight management services. PMID:27293236
Incorporating a Weight Management Skills Workshop in Pharmacy Curricula in Australia.
Um, Irene S; Krass, Ines; Armour, Carol; Gill, Timothy; Chaar, Betty B
2016-05-25
Objective. To develop, implement, and evaluate a competency-based weight management skills workshop for undergraduate pharmacy students in an Australian university. Design. A 3-hour workshop titled "Weight Management in Pharmacy" was implemented with a cohort of fourth-year undergraduate pharmacy students (n=180). Learning activities used included case-based learning, hands-on experience, role-play, and group discussion. Assessment. A 22-item attitudinal survey instrument and the validated Obesity Risk Knowledge (ORK-10) scale were administered at baseline and postworkshop to evaluate the impact of this educational workshop. There was significant improvement in the students' ORK scores and students' perceived level of self-confidence in performing weight management skills. Conclusion. An educational workshop designed to enhance professional competencies in weight management ensured graduates were "service-ready" and had the appropriate knowledge, skills, and attributes to deliver patient-centered pharmacy-based weight management services.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Auberle, W.M.; Alvarez, V.M.; Leary, J.
1999-07-01
A collaborative program among agencies and professionals in Mexico and the US is designing, developing and delivering specialized workshops for Mexican officials responsible for air quality management. The initial project is development and pilot delivery (Spring 1999) of a workshop for senior officials of SEMARNAP plus selected state and municipal officials. This paper describes the process for design of professional development programs in air quality management for Mexican officials. Key issues include optimum learning styles and delivery techniques; available time of senior managers for education; need for new materials versus adaptation of existing air quality management information; and utilization ofmore » the Internet and asynchronous methods to supplement the traditional workshop format. The paper describes the results of this analysis and design features and content of the initial workshop.« less
Fault recovery characteristics of the fault tolerant multi-processor
NASA Technical Reports Server (NTRS)
Padilla, Peter A.
1990-01-01
The fault handling performance of the fault tolerant multiprocessor (FTMP) was investigated. Fault handling errors detected during fault injection experiments were characterized. In these fault injection experiments, the FTMP disabled a working unit instead of the faulted unit once every 500 faults, on the average. System design weaknesses allow active faults to exercise a part of the fault management software that handles byzantine or lying faults. It is pointed out that these weak areas in the FTMP's design increase the probability that, for any hardware fault, a good LRU (line replaceable unit) is mistakenly disabled by the fault management software. It is concluded that fault injection can help detect and analyze the behavior of a system in the ultra-reliable regime. Although fault injection testing cannot be exhaustive, it has been demonstrated that it provides a unique capability to unmask problems and to characterize the behavior of a fault-tolerant system.
On-board fault management for autonomous spacecraft
NASA Technical Reports Server (NTRS)
Fesq, Lorraine M.; Stephan, Amy; Doyle, Susan C.; Martin, Eric; Sellers, Suzanne
1991-01-01
The dynamic nature of the Cargo Transfer Vehicle's (CTV) mission and the high level of autonomy required mandate a complete fault management system capable of operating under uncertain conditions. Such a fault management system must take into account the current mission phase and the environment (including the target vehicle), as well as the CTV's state of health. This level of capability is beyond the scope of current on-board fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems that can meet the needs of spacecraft that have long-range autonomy requirements. We have implemented a model-based approach to fault detection and isolation that does not require explicit characterization of failures prior to launch. It is thus able to detect failures that were not considered in the failure and effects analysis. We have applied this technique to several different subsystems and tested our approach against both simulations and an electrical power system hardware testbed. We present findings from simulation and hardware tests which demonstrate the ability of our model-based system to detect and isolate failures, and describe our work in porting the Ada version of this system to a flight-qualified processor. We also discuss current research aimed at expanding our system to monitor the entire spacecraft.
NASA Technical Reports Server (NTRS)
Freeman, Kenneth A.; Walsh, Rick; Weeks, David J.
1988-01-01
Space Station issues in fault management are discussed. The system background is described with attention given to design guidelines and power hardware. A contractually developed fault management system, FRAMES, is integrated with the energy management functions, the control switchgear, and the scheduling and operations management functions. The constraints that shaped the FRAMES system and its implementation are considered.
Workshop: Valuing and Managing Ecosystems: Economic Research Sponsored by NSF/EPA (1998)
Materials from first workshop in series of Environmental Policy and Economics Workshops. Focus on valuing and managing ecosystems, with papers on use of stated preference methods, examining markets for diverse biologic resources and conservation measures.
Total Quality Management (TQM). Implementers Workshop
1990-05-15
SHEE’T :s t’ii ,rrl DEPARTMENT OF DEFENSE May 15, 1990 Lfl CN I TOTAL QUALITY MANAGEMENT (TQM) Implementers Workshop © Copyright 1990 Booz.Allen...must be continually performed in order to achieve successful TQM implementation. 1-5 = TOTAL QUALITY MANAGEMENT Implementers Workshop Course Content...information, please refer to the student manual, Total Quality Management (TOM) Awareness Seminar, that was provided for the Awareness Course. You may
The workshop "Managing Arsenic Risks to the Environment: Charaterization of Waste, Chemistry and Treatment and Disposal," was held 5/1-3/2001 in Denver, CO. This workshop was sponsored and facilitated by USEPA's ORD and OSWER. The purpose of the workshop was to achieve three goal...
Delivery of workshops on corridor management and preservation in Texas.
DOT National Transportation Integrated Search
2010-12-01
This report summarizes the delivery and outcome of a series of workshops conducted at 23 Texas : Department of Transportation (TxDOT) districts across the state on corridor management and preservation : in Texas. The workshops served as follow-up imp...
NASA Technical Reports Server (NTRS)
Padilla, Peter A.
1991-01-01
An investigation was made in AIRLAB of the fault handling performance of the Fault Tolerant MultiProcessor (FTMP). Fault handling errors detected during fault injection experiments were characterized. In these fault injection experiments, the FTMP disabled a working unit instead of the faulted unit once in every 500 faults, on the average. System design weaknesses allow active faults to exercise a part of the fault management software that handles Byzantine or lying faults. Byzantine faults behave such that the faulted unit points to a working unit as the source of errors. The design's problems involve: (1) the design and interface between the simplex error detection hardware and the error processing software, (2) the functional capabilities of the FTMP system bus, and (3) the communication requirements of a multiprocessor architecture. These weak areas in the FTMP's design increase the probability that, for any hardware fault, a good line replacement unit (LRU) is mistakenly disabled by the fault management software.
Workshop in a Box: Sustainable Management of Rural and Small Water and Wastewater Systems Workshops
A resource to help rural and small systems and communities to conduct workshops, either for an individual system or for a group of systems, based on the Rural and Small Systems Guidebook to Sustainable Utility Management.
The Assessment and Management of Suicide Risk: State of Workshop Education
Pisani, Anthony R.; Cross, Wendi F.; Gould, Madelyn S.
2012-01-01
A systematic search of popular and scholarly databases identified workshops that addressed general clinical competence in the assessment or management of suicide risk, targeted mental health professionals, and had at least one peerreviewed publication. We surveyed workshop developers and examined empirical articles associated with each workshop. The state of workshop education is characterized by presenting the learning objectives, educational formats, instructor factors, and evaluation studies. Workshops are efficacious for transferring knowledge and shifting attitudes; however, their role in improving clinical care and outcomes of suicidal patients has yet to be determined. PMID:21477093
A Security Architecture for Fault-Tolerant Systems
1993-06-03
aspect of our effort to achieve better performance is integrating the system into microkernel -based operating systems. 4 Summary and discussion In...135-171, June 1983. [vRBC+92] R. van Renesse, K. Birman, R. Cooper, B. Glade, and P. Stephenson. Reliable multicast between microkernels . In...Proceedings of the USENIX Microkernels and Other Kernel Architectures Workshop, April 1992. 29
Strasser, Jane E; Cola, Philip A; Rosenblum, Daniel
2013-08-01
Emphasis has been placed on assessing the efficiency of clinical and translational research as part of the National Institutes of Health (NIH) goal to "improve human health." Improvements identified and implemented by individual organizations cannot address the research infrastructure needs of all clinical and translational research conducted. NIH's National Center for Advancing Translational Sciences (NCATS) has brought together 61 Clinical and Translational Science Award (CTSA) sites creating a virtual national laboratory that reflects the diversity and breadth of academic medical centers to collectively improve clinical and translational science. The annual Clinical Research Management workshop is organized by the CTSA consortium with participation from CTSA awardees, NIH, and others with an interest in clinical research management. The primary objective of the workshop is to disseminate information that improves clinical research management although the specific objectives of each workshop evolve within the consortium. The fifth annual workshop entitled "Learning by doing; applying evidence-based tools to re-engineer clinical research management" took place in June 2012. The primary objective of the 2012 workshop was to utilize data to evaluate, modify, and improve clinical research management. This report provides a brief summary of the workshop proceedings and the major themes discussed among the participants. © 2013 Wiley Periodicals, Inc.
Workshop proceedings: management of western forests and grasslands for nongame birds
USDA Forest Service
1980-01-01
Contains proceedings of the fourth and last regional workshop sponsored by the National Nongame Bird Steering Committee. The workshop, held in Salt Lake City, Utah, February 11-14, 1980, presented information on management of western forests and grasslands for nongame birds.
A stress management workshop improves residents' coping skills.
McCue, J D; Sachs, C L
1991-11-01
We describe the effectiveness of a stress management workshop designed for physicians. Of the 64 medicine, pediatrics, and medicine-pediatrics residents who agreed to participate in the workshop, the 43 who could be freed from clinical responsibilities constituted the intervention group; the 21 residents who could not be freed from clinical responsibilities were asked to be the nonintervention group. The ESSI Stress Systems Instrument and Maslach Burnout Inventory were administered to control subjects and workshop participants 2 weeks before and 6 weeks after the workshop. The half-day workshops taught management of the stresses of medical practice through: (1) learning and practicing interpersonal skills that increase the availability of social support; (2) prioritization of personal, work, and educational demands; (3) techniques to increase stamina and attend to self-care needs; (4) recognition and avoidance of maladaptive responses; and (5) positive outlook skills. Overall, the ESSI Stress Systems Instrument test scores for the workshop participants improved (+1.27), while the nonintervention group's mean scores declined (-0.65). All 21 individual ESSI Stress Systems Instrument scale items improved for the workshop, compared with eight of 21 items for the nonintervention group. The workshop group improved in the Maslach Burnout Inventory emotional exhaustion scale and deteriorated less than the nonintervention group in the depersonalization scale. We conclude that a modest, inexpensive stress management workshop was received positively, and can lead to significant short-term improvement in stress and burnout test scores for medicine and pediatrics residents.
On becoming a coach: a pilot intervention study with managers in long-term care.
Cummings, Greta; Mallidou, Anastasia A; Masaoud, Elmabrok; Kumbamu, Ashok; Schalm, Corinne; Spence Laschinger, Heather K; Estabrooks, Carole A
2014-01-01
Health care leaders have called for the development of communication and leadership skills to improve manager-employee relationships, employee job satisfaction, quality care, and work environments. The aim of the study reported here was to pilot how a 2-day coaching workshop ("Coaching for Impressive CARE") conducted as a leadership development strategy influenced frontline care managers' coaching practices in residential long-term care (LTC) settings. We had four objectives: (a) to identify managers' perceptions of their role as a coach of employee performance in LTC facilities, (b) to understand managers' intentions to coach employee performance, (c) to examine opportunities and factors that contributed to or challenged implementation of workshop coaching skills in daily leadership/management practice, and (d) to examine managers' reports of using coaching practices and employee responses after the workshop. We used an exploratory/descriptive design involving pre-/post-workshop surveys, e-mail reminders, and focus groups to examine participation of 21 LTC managers in a 2-day coaching workshop and their use of coaching practices in the workplace. Focus group findings provided examples of how participants used their coaching skills in practice (e.g., communicating empathy) and how staff responded. Factors contributing to and challenging implementation of these coaching skills in the workplace were identified. Attitudes and intentions to be a coach increased significantly, and some coaching skills were used more frequently after the workshop, specifically planning for performance change with employees. The coaching workshop was feasible to implement, well received by participants, influenced their willingness to become coaches, and had some noted impact on their use of coaching behaviors in the workplace. Coaching skills by managers to improve staff performance with residents in LTC facilities can be learned.
Fault management and systems knowledge
DOT National Transportation Integrated Search
2016-12-01
Pilots are asked to manage faults during flight operations. This leads to the training question of the type and depth of system knowledge required to respond to these faults. Based on discussions with multiple airline operators, there is agreement th...
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management English English Español Weight Management Obesity is a ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
A "Mental-Health-at-the-Workplace" Educational Workshop Reduces Managers' Stigma Toward Depression.
Hamann, Johannes; Mendel, Rosmarie; Reichhart, Tatjana; Rummel-Kluge, Christine; Kissling, Werner
2016-01-01
Stigma and discrimination are important factors hindering people with mental health conditions to stay employed or successfully make their careers. We surveyed 580 German managers before and after visiting a "mental-health-at-the-workplace" educational workshop using the Depression Stigma Scale. The workshop significantly reduced stigma toward depression. Managers at baseline already exhibited lower stigma toward depression compared with the general population. In addition, female gender and higher education predicted lower stigma, which is in line with findings from other studies. We conclude that an educational workshop giving practical guidance regarding "mental-health-at-the-workplace" reduces managers' stigma toward depression and improves knowledge regarding depression, its course, and its treatment.
Stacking faults density driven collapse of magnetic energy in hcp-cobalt nano-magnets
NASA Astrophysics Data System (ADS)
Nong, H. T. T.; Mrad, K.; Schoenstein, F.; Piquemal, J.-Y.; Jouini, N.; Leridon, B.; Mercone, S.
2017-06-01
Cobalt nanowires with different shape parameters were synthesized via the polyol process. By calculating the magnetic energy product (BH max) both for dried nano-powder and for nanowires in their synthesis solution, we observed unexpected independent BH max values from the nanowires shape. A good alignment of the nanowires leads to a higher BH max value. Our results show that the key parameter driving the magnetic energy product of the cobalt nanowires is the stacking fault density. An exponential collapse of the magnetic energy is observed at very low percentage of structural faults. Cobalt nanowires with almost perfect hcp crystalline structures should present high magnetic energy, which is promising for application in rare earth-free permanent magnets. Oral talk at 8th International Workshop on Advanced Materials Science and Nanotechnology (IWAMSN2016), 8-12 November 2016, Ha Long City, Vietnam.
Acadia National Park Climate Change Scenario Planning Workshop summary
Star, Jonathan; Fisichelli, Nicholas; Bryan, Alexander; Babson, Amanda; Cole-Will, Rebecca; Miller-Rushing, Abraham J.
2016-01-01
This report summarizes outcomes from a two-day scenario planning workshop for Acadia National Park, Maine (ACAD). The primary objective of the workshop was to help ACAD senior leadership make management and planning decisions based on up-to-date climate science and assessments of future uncertainty. The workshop was also designed as a training program, helping build participants' capabilities to develop and use scenarios. The details of the workshop are given in later sections. The climate scenarios presented here are based on published global climate model output. The scenario implications for resources and management decisions are based on expert knowledge distilled through scientist-manager interaction during workgroup break-out sessions at the workshop. Thus, the descriptions below are from these small-group discussions in a workshop setting and should not be taken as vetted research statements of responses to the climate scenarios, but rather as insights and examinations of possible futures (Martin et al. 2011, McBride et al. 2012).
Workshop on Integrated Crew Resource Management (CRM), 19-21 November 1991
1992-03-01
VI DOT/FAAIRD-92/5 Workshop on Integrated Research and Development Service Crew Resource Washington, DC 20591 Management ( CRM ) AD-A252 980 II! Ir H... Management ( CRM ) Page i Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. DOT/FAA/RD-92/5I 4. Title and...Subtitle S. Report Date May 1992 Workshop on Integrated Crew Resource Management ( CRM ) 6. Performing Organization Code ARD-1 8. Performing
Computer Simulation for Emergency Incident Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, D L
2004-12-03
This report describes the findings and recommendations resulting from the Department of Homeland Security (DHS) Incident Management Simulation Workshop held by the DHS Advanced Scientific Computing Program in May 2004. This workshop brought senior representatives of the emergency response and incident-management communities together with modeling and simulation technologists from Department of Energy laboratories. The workshop provided an opportunity for incident responders to describe the nature and substance of the primary personnel roles in an incident response, to identify current and anticipated roles of modeling and simulation in support of incident response, and to begin a dialog between the incident responsemore » and simulation technology communities that will guide and inform planned modeling and simulation development for incident response. This report provides a summary of the discussions at the workshop as well as a summary of simulation capabilities that are relevant to incident-management training, and recommendations for the use of simulation in both incident management and in incident management training, based on the discussions at the workshop. In addition, the report discusses areas where further research and development will be required to support future needs in this area.« less
Workshops and Training | Eliminating Sanitary Sewer ...
2017-04-10
EPA New England is working with partners to develop outreach, workshops and tools to assist those working to prevent sewage overflows and improve the management of water/wastewater systems. We have ongoing efforts on CMOM (Capacity, Management, Operation and Maintenance), Asset Management and energy management.
Coordinated Fault-Tolerance for High-Performance Computing Final Project Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Panda, Dhabaleswar Kumar; Beckman, Pete
2011-07-28
With the Coordinated Infrastructure for Fault Tolerance Systems (CIFTS, as the original project came to be called) project, our aim has been to understand and tackle the following broad research questions, the answers to which will help the HEC community analyze and shape the direction of research in the field of fault tolerance and resiliency on future high-end leadership systems. Will availability of global fault information, obtained by fault information exchange between the different HEC software on a system, allow individual system software to better detect, diagnose, and adaptively respond to faults? If fault-awareness is raised throughout the system throughmore » fault information exchange, is it possible to get all system software working together to provide a more comprehensive end-to-end fault management on the system? What are the missing fault-tolerance features that widely used HEC system software lacks today that would inhibit such software from taking advantage of systemwide global fault information? What are the practical limitations of a systemwide approach for end-to-end fault management based on fault awareness and coordination? What mechanisms, tools, and technologies are needed to bring about fault awareness and coordination of responses on a leadership-class system? What standards, outreach, and community interaction are needed for adoption of the concept of fault awareness and coordination for fault management on future systems? Keeping our overall objectives in mind, the CIFTS team has taken a parallel fourfold approach. Our central goal was to design and implement a light-weight, scalable infrastructure with a simple, standardized interface to allow communication of fault-related information through the system and facilitate coordinated responses. This work led to the development of the Fault Tolerance Backplane (FTB) publish-subscribe API specification, together with a reference implementation and several experimental implementations on top of existing publish-subscribe tools. We enhanced the intrinsic fault tolerance capabilities representative implementations of a variety of key HPC software subsystems and integrated them with the FTB. Targeting software subsystems included: MPI communication libraries, checkpoint/restart libraries, resource managers and job schedulers, and system monitoring tools. Leveraging the aforementioned infrastructure, as well as developing and utilizing additional tools, we have examined issues associated with expanded, end-to-end fault response from both system and application viewpoints. From the standpoint of system operations, we have investigated log and root cause analysis, anomaly detection and fault prediction, and generalized notification mechanisms. Our applications work has included libraries for fault-tolerance linear algebra, application frameworks for coupled multiphysics applications, and external frameworks to support the monitoring and response for general applications. Our final goal was to engage the high-end computing community to increase awareness of tools and issues around coordinated end-to-end fault management.« less
41 CFR 60-741.47 - Sheltered workshops.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sheltered workshops may be included within an affirmative action program if the sheltered workshop trains... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Sheltered workshops. 60... REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.47 Sheltered workshops...
Cola, Philip A.; Rosenblum, Daniel
2013-01-01
Abstract Emphasis has been placed on assessing the efficiency of clinical and translational research as part of the National Institutes of Health (NIH) goal to “improve human health.” Improvements identified and implemented by individual organizations cannot address the research infrastructure needs of all clinical and translational research conducted. NIH's National Center for Advancing Translational Sciences (NCATS) has brought together 61 Clinical and Translational Science Award (CTSA) sites creating a virtual national laboratory that reflects the diversity and breadth of academic medical centers to collectively improve clinical and translational science. The annual Clinical Research Management workshop is organized by the CTSA consortium with participation from CTSA awardees, NIH, and others with an interest in clinical research management. The primary objective of the workshop is to disseminate information that improves clinical research management although the specific objectives of each workshop evolve within the consortium. The fifth annual workshop entitled “Learning by doing; applying evidence‐based tools to re‐engineer clinical research management” took place in June 2012. The primary objective of the 2012 workshop was to utilize data to evaluate, modify, and improve clinical research management. This report provides a brief summary of the workshop proceedings and the major themes discussed among the participants. PMID:23919369
From November 8/9, 2011, the U.S. Environmental Protection Agency (EPA) hosted a workshop titled "Managing the Environmental Impacts of Growth Under Climate Change." The Office of Research and Development (ORD) organized the meeting, which was held in Research Triangle Park, Nort...
ERIC Educational Resources Information Center
Goldfine, Alan H., Ed.
This workshop investigated how managers can evaluate, select, and effectively use information resource management (IRM) tools, especially data dictionary systems (DDS). An executive summary, which provides a definition of IRM as developed by workshop participants, precedes the keynote address, "Data: The Raw Material of a Paper Factory,"…
Advanced Grid Control Technologies Workshop Series | Energy Systems
on advanced distribution management systems (ADMS) and microgrid controls. The workshops were held at . July 7, 2015: Advanced Distribution Management Systems (ADMS) Welcome and NREL Overview Dr. Murali Keynote: Next-Generation Distribution Management Systems and Distributed Resource Energy Management
Asian Society of Gynecologic Oncology International Workshop 2014.
Park, Jeong Yeol; Ngan, Hextan Yuen Sheung; Park, Won; Cao, Zeyi; Wu, Xiaohua; Ju, Woong; Chung, Hyun Hoon; Chang, Suk Joon; Park, Sang Yoon; Ryu, Sang Young; Kim, Jae Hoon; Cho, Chi Heum; Lee, Keun Ho; Lee, Jeong Won; Kumarasamy, Suresh; Kim, Jae Weon; Wilailak, Sarikapan; Kim, Byoung Gie; Kim, Dae Yeon; Konishi, Ikuo; Lee, Jae Kwan; Wang, Kung Liahng; Nam, Joo Hyun
2015-01-01
The Asian Society of Gynecologic Oncology International Workshop 2014 on gynecologic oncology was held in Asan Medical Center, Seoul, Korea on the 23rd to 24th August 2014. A total of 179 participants from 17 countries participated in the workshop, and the up-to-date findings on the management of gynecologic cancers were presented and discussed. This meeting focused on the new trends in the management of cervical cancer, fertility-sparing management of gynecologic cancers, surgical management of gynecologic cancers, and recent advances in translational research on gynecologic cancers.
Asian Society of Gynecologic Oncology International Workshop 2014
Park, Jeong-Yeol; Ngan, Hextan Yuen Sheung; Park, Won; Cao, Zeyi; Wu, Xiaohua; Ju, Woong; Chung, Hyun Hoon; Chang, Suk-Joon; Park, Sang-Yoon; Ryu, Sang-Young; Kim, Jae-Hoon; Cho, Chi-Heum; Lee, Keun Ho; Lee, Jeong-Won; Kumarasamy, Suresh; Kim, Jae-Weon; Wilailak, Sarikapan; Kim, Byoung-Gie; Kim, Dae-Yeon; Konishi, Ikuo; Lee, Jae-Kwan; Wang, Kung-Liahng
2015-01-01
The Asian Society of Gynecologic Oncology International Workshop 2014 on gynecologic oncology was held in Asan Medical Center, Seoul, Korea on the 23rd to 24th August 2014. A total of 179 participants from 17 countries participated in the workshop, and the up-to-date findings on the management of gynecologic cancers were presented and discussed. This meeting focused on the new trends in the management of cervical cancer, fertility-sparing management of gynecologic cancers, surgical management of gynecologic cancers, and recent advances in translational research on gynecologic cancers. PMID:25609163
Automated Generation of Fault Management Artifacts from a Simple System Model
NASA Technical Reports Server (NTRS)
Kennedy, Andrew K.; Day, John C.
2013-01-01
Our understanding of off-nominal behavior - failure modes and fault propagation - in complex systems is often based purely on engineering intuition; specific cases are assessed in an ad hoc fashion as a (fallible) fault management engineer sees fit. This work is an attempt to provide a more rigorous approach to this understanding and assessment by automating the creation of a fault management artifact, the Failure Modes and Effects Analysis (FMEA) through querying a representation of the system in a SysML model. This work builds off the previous development of an off-nominal behavior model for the upcoming Soil Moisture Active-Passive (SMAP) mission at the Jet Propulsion Laboratory. We further developed the previous system model to more fully incorporate the ideas of State Analysis, and it was restructured in an organizational hierarchy that models the system as layers of control systems while also incorporating the concept of "design authority". We present software that was developed to traverse the elements and relationships in this model to automatically construct an FMEA spreadsheet. We further discuss extending this model to automatically generate other typical fault management artifacts, such as Fault Trees, to efficiently portray system behavior, and depend less on the intuition of fault management engineers to ensure complete examination of off-nominal behavior.
Thenhaus, P.C.; McKeown, F.A.; Bucknam, R.C.; Ross, D.C.; Anderson, R.E.; Irwin, W.P.; Russ, D.P.; Diment, W.H.; Thenhaus, Paul C.
1983-01-01
Workshops were convened by the U.S. Geological Survey to obtain the latest information and concepts relative to defining seismic source zones for five regions of the United States. The zones, with some modifications, have been used in preparation of new national probabilistic ground motion hazard maps by the U.S. Geological Survey. The five regions addressed are the Great Basin, the Northern Rocky Mountains, the Southern Rocky Mountains, the Central Interior, and the northeastern United States. Discussions at the workshops focussed on possible temporal and spatial variations of seismicity within the regions, latest ages of surface-fault displacements, most recent uplift or subsidence, geologic structural provinces as they relate to seismicity, and speculation on earthquake causes. Within the Great Basin region, the zones conform to areas characterized by a predominance of faults that have certain ages of latest surface displacements. In the Northern and Southern Rocky Mountain regions, zones primarily conform to distinctive structural terrane. In the Central Interior, primary emphasis was placed on an interpretation of the areal distribution of historic seismicity, although geophysical studies in the Reelfoot rift area provided data for defining zones in the New Madrid earthquake area. An interpretation of the historic seismicity also provided the basis for drawing the zones of the New England region. Estimates of earthquake maximum magnitudes and of recurrence times for these earthquakes are given for most of the zones and are based on either geologic data or opinion.
Hosseini, Seyed Kianoosh; Ghalamkari, Marziyeh; Yousefshahi, Fardin; Mireskandari, Seyed Mohammad; Rezaei Hamami, Mohsen
2013-10-28
Cardiopulmonary-cerebral resuscitation (CPCR) training is essential for all hospital workers, especially junior residents who might become the manager of the resuscitation team. In our center, the traditional CPCR knowledge training curriculum for junior residents up to 5 years ago was lecture-based and had some faults. This study aimed to evaluate the effect of a problem-based method on residents' CPCR knowledge and skills as well as their evaluation of their CPCR trainers. This study, conducted at Tehran University of Medical Sciences, included 290 first-year residents in 2009-2010 - who were trained via a problem-based method (the problem-based group) - and 160 first-year residents in 2003-2004 - who were trained via a lecture-based method (the lecture-based group). Other educational techniques and facilities were similar. The participants self-evaluated their own CPCR knowledge and skills pre and post workshop and also assessed their trainers' efficacy post workshop by completing special questionnaires. The problem-based group, trained via the problem-based method, had higher self-assessment scores of CPCR knowledge and skills post workshop: the difference as regards the mean scores between the problem-based and lecture-based groups was 32.36 ± 19.23 vs. 22.33 ± 20.35 for knowledge (p value = 0.003) and 10.13 ± 7.17 vs. 8.19 ± 8.45 for skills (p value = 0.043). The residents' evaluation of their trainers was similar between the two study groups (p value = 0.193), with the mean scores being 15.90 ± 2.59 and 15.46 ± 2.90 in the problem-based and lecture-based groups - respectively. The problem-based method increased our residents' self-evaluation score of their own CPCR knowledge and skills.
This proceedings document summarizes prepared remarks, presentations and discussions from the G7 Alliance on Resource Efficiency: U.S.-hosted Workshop on the Use of Life Cycle Concepts in Supply Chain Management to Achieve Resource Efficiency.
ERIC Educational Resources Information Center
Luck, Joe D.; Fulton, John P.; Rees, Jennifer
2015-01-01
Three Precision Agriculture Data Management workshops regarding yield monitor data were conducted in 2014, reaching 62 participants. Post-workshop surveys (n = 58) indicated 73% of respondents experienced a moderate to significant increase in knowledge related to yield monitor data usage. Another 72% reported that they planned to utilize best…
Jiang, Luohua; Smith, Matthew Lee; Chen, Shuai; Ahn, SangNam; Kulinski, Kristie P; Lorig, Kate; Ory, Marcia G
2014-01-01
The Chronic Disease Self-Management Program (CDSMP) has been widely disseminated among various racial and ethnic populations. In addition to the six required CDSMP workshop sessions, the delivery sites have the option to offer a Session Zero (or zero class), an information session offered prior to Session One as a marketing tool. Despite assumptions that a zero class is helpful, little is known about the prevalence of these additional sessions or their impact on retaining participants in CDSMP workshops. This study aims to describe the proportion of CDSMP workshops that offered Session Zero and examine the association between Session Zero and workshop completion rates. Data were analyzed from 80,987 middle-aged and older adults collected during a two-year national dissemination of CDSMP. Generalized estimating equation regression analyses were conducted to assess the association between Session Zero and successful workshop completion (attending four or more of the six workshop sessions). On average, 21.04% of the participants attended workshops that offered Session Zero, and 75.33% successfully completed the CDSMP workshop. The participants of the workshops that offered Session Zero had significantly higher odds of completing CDSMP workshops than those who were not offered Session Zero (OR = 1.099, P = <0.001) after controlling for participants' demographic characteristics, race, ethnicity, living status, household income, number of chronic conditions, and workshop delivery type. As one of the first studies reporting the importance of an orientation session for participant retention in chronic disease management intervention projects, our findings suggest offering an orientation session may increase participant retention in similar translational efforts.
Transportation Management Workshop: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
This report is a compilation of discussions presented at the Transportation Management Workshop held in Gaithersburg, Maryland. Topics include waste packaging, personnel training, robotics, transportation routing, certification, containers, and waste classification.
The effectiveness of workshops on management evaluation of traffic safety programs.
DOT National Transportation Integrated Search
1977-01-01
Nine management evaluation workshops based on The Evaluation of Highway Traffic Safety Programs' A Manual for Managers were held in various cities throughout the United States by the Office of Manpower Development (NHTSA). The analysis reported here ...
Cramer, Robert J; Bryson, Claire N; Eichorst, Morgam K; Keyes, Lee N; Ridge, Brittany E
2017-03-01
As professional psychology training programs and continuing education have moved toward competency based approaches, it has become equally important to develop uniform, evidence-based approaches for suicide risk assessment and management. The present article presents a workshop curriculum based on established core competencies in suicide risk assessment and management. Drawing on theories suicide risk formation, the workshop features an integration of didactic, process, and experiential components. We present pilot data from 2 small group workshops (n = 17): 1 from a clinical psychology doctoral program and 1 from a university counseling center. Workshop participation yielded increases in (a) the ability to recognize appropriate clinician responses to suicidal client statements, (b) self-perceptions of general capacity to interface with suicidal patients and mastery of the 10 core competencies, (c) factual knowledge concerning suicide risk assessment and management, and (d) the self-rated ability to assess and manage a suicidal patient. We discuss statistical and generalizability limitations as well as implications for future modification, implementation, and provision of this training method. © 2016 Wiley Periodicals, Inc.
Hospital preparedness for Ebola virus disease: a training course in the Philippines
Carlos, Celia; Capistrano, Rowena; Tobora, Charissa Fay; delos Reyes, Mari Rose; Lupisan, Socorro; Corpuz, Aura; Aumentado, Charito; Suy, Lyndon Lee; Hall, Julie; Donald, Julian; Counahan, Megan; Curless, Melanie S; Rhymer, Wendy; Gavin, Melanie; Lynch, Chelsea; Black, Meredith A; Anduyon, Albert D; Buttner, Petra
2015-01-01
Objective To develop, teach and evaluate a training workshop that could rapidly prepare large numbers of health professionals working in hospitals in the Philippines to detect and safely manage Ebola virus disease (EVD). The strategy was to train teams (each usually with five members) of key health professionals from public, private and local government hospitals across the Philippines who could then guide Ebola preparedness in their hospitals. Methods The workshop was developed collaboratively by the Philippine Department of Health and the country office of the World Health Organization. It was evaluated using a pre- and post-workshop test and two evaluation forms. χ2 tests and linear regression analyses were conducted comparing pre- and post-workshop test results. Results A three-day workshop was developed and used to train 364 doctors, nurses and medical technologists from 78 hospitals across the Philippines in three initial batches. Knowledge about EVD increased significantly (P < 0.009) although knowledge on transmission remained suboptimal. Confidence in managing EVD increased significantly (P = 0.018) with 96% of participants feeling more prepared to safely manage EVD cases. Discussion: The three-day workshop to prepare hospital staff for EVD was effective at increasing the level of knowledge about EVD and the level of confidence in managing EVD safely. This workshop could be adapted for use as baseline training in EVD in other developing countries to prepare large numbers of hospital staff to rapidly detect, isolate and safely manage EVD cases. PMID:25960920
Model Transformation for a System of Systems Dependability Safety Case
NASA Technical Reports Server (NTRS)
Murphy, Judy; Driskell, Stephen B.
2010-01-01
Software plays an increasingly larger role in all aspects of NASA's science missions. This has been extended to the identification, management and control of faults which affect safety-critical functions and by default, the overall success of the mission. Traditionally, the analysis of fault identification, management and control are hardware based. Due to the increasing complexity of system, there has been a corresponding increase in the complexity in fault management software. The NASA Independent Validation & Verification (IV&V) program is creating processes and procedures to identify, and incorporate safety-critical software requirements along with corresponding software faults so that potential hazards may be mitigated. This Specific to Generic ... A Case for Reuse paper describes the phases of a dependability and safety study which identifies a new, process to create a foundation for reusable assets. These assets support the identification and management of specific software faults and, their transformation from specific to generic software faults. This approach also has applications to other systems outside of the NASA environment. This paper addresses how a mission specific dependability and safety case is being transformed to a generic dependability and safety case which can be reused for any type of space mission with an emphasis on software fault conditions.
Grant, Evan H. Campbell; Wofford, John E.B.; Smith, D.R.; Dennis, J.; Hawkins-Hoffman, C.; Schaberl, J.; Foley, M.; Bogle, M.
2014-01-01
Here we report on a structured decision making (SDM) process to identify management strategies to ensure persistence of the federally endangered Shenandoah salamander (Plethodon shenandoah), given that it may be at increased extinction risk under projected climate change. The focus of this report is the second of two SDM workshops; in the first workshop, participants developed a prototype of the decision, including problem frame, management objectives and a suite of potential management strategies, predictive models to inform the decision and link alternatives with the objectives to identify potential solutions, and identified data needs to reduce key uncertainties in the decision. Participants in this second workshop included experts in National Park Service policy at multiple administrative levels, who refined objectives, further evaluated the initial management alternatives, and discussed policy constraints on implementing active management for the species and its high-elevation habitat. The conclusion of the second workshop was similar to that of the first: the current state of information and objectives suggest that there is some value in considering active management to reduce the long-term extinction risk for the species, though there are institutional conservative policies to implementing active management at range-wide scales. The workshop participants also emphasized a conservative NPS management philosophy, including caution in implementing management actions that may ultimately harm the system, a stated assumption that ecosystem changes were “natural” unless demonstrated otherwise (therefore not warranting active management to mitigate), and a need to demonstrate that extinction risk is tied to anthropogenic influence prior to taking active management to mitigate specific anthropogenic influences. Even within a protected area having minimal human disturbance, intertwined environmental variables and interspecific relationships that drive population trends challenge our ability to demonstrate direct links with (anthropogenically influenced) climate change and the decline of a species. Thus while this policy may reduce the potential for injurious management, it may also necessitate extraordinary resources to reduce uncertainty regarding fundamental drivers of species decline prior to taking action.
1994 Science Information Management and Data Compression Workshop
NASA Technical Reports Server (NTRS)
Tilton, James C. (Editor)
1994-01-01
This document is the proceedings from the 'Science Information Management and Data Compression Workshop,' which was held on September 26-27, 1994, at the NASA Goddard Space Flight Center, Greenbelt, Maryland. The Workshop explored promising computational approaches for handling the collection, ingestion, archival and retrieval of large quantities of data in future Earth and space science missions. It consisted of eleven presentations covering a range of information management and data compression approaches that are being or have been integrated into actual or prototypical Earth or space science data information systems, or that hold promise for such an application. The workshop was organized by James C. Tilton and Robert F. Cromp of the NASA Goddard Space Flight Center.
The 1995 Science Information Management and Data Compression Workshop
NASA Technical Reports Server (NTRS)
Tilton, James C. (Editor)
1995-01-01
This document is the proceedings from the 'Science Information Management and Data Compression Workshop,' which was held on October 26-27, 1995, at the NASA Goddard Space Flight Center, Greenbelt, Maryland. The Workshop explored promising computational approaches for handling the collection, ingestion, archival, and retrieval of large quantities of data in future Earth and space science missions. It consisted of fourteen presentations covering a range of information management and data compression approaches that are being or have been integrated into actual or prototypical Earth or space science data information systems, or that hold promise for such an application. The Workshop was organized by James C. Tilton and Robert F. Cromp of the NASA Goddard Space Flight Center.
1996 Coolant Flow Management Workshop
NASA Technical Reports Server (NTRS)
Hippensteele, Steven A. (Editor)
1997-01-01
The following compilation of documents includes a list of the 66 attendees, a copy of the viewgraphs presented, and a summary of the discussions held after each session at the 1996 Coolant Flow Management Workshop held at the Ohio Aerospace Institute, adjacent to the NASA Lewis Research Center, Cleveland, Ohio on December 12-13, 1996. The workshop was organized by H. Joseph Gladden and Steven A. Hippensteele of NASA Lewis Research Center. Participants in this workshop included Coolant Flow Management team members from NASA Lewis, their support service contractors, the turbine engine companies, and the universities. The participants were involved with research projects, contracts and grants relating to: (1) details of turbine internal passages, (2) computational film cooling capabilities, and (3) the effects of heat transfer on both sides. The purpose of the workshop was to assemble the team members, along with others who work in gas turbine cooling research, to discuss needed research and recommend approaches that can be incorporated into the Center's Coolant Flow Management program. The workshop was divided into three sessions: (1) Internal Coolant Passage Presentations, (2) Film Cooling Presentations, and (3) Coolant Flow Integration and Optimization. Following each session there was a group discussion period.
Bringing climate change into natural resource management: proceedings.
L. Joyce; R. Haynes; R. White; R.J. Barbour
2007-01-01
These are the proceedings of the 2005 workshop titled implications of bringing climate into natural resource management in the Western United States. This workshop was an attempt to further the dialogue among scientists, land managers, landowners, interested stakeholders and the public about how individuals are addressing climate change in natural resource management....
A Decade of Neural Networks: Practical Applications and Prospects
NASA Technical Reports Server (NTRS)
Kemeny, Sabrina E.
1994-01-01
The Jet Propulsion Laboratory Neural Network Workshop, sponsored by NASA and DOD, brings together sponsoring agencies, active researchers, and the user community to formulate a vision for the next decade of neural network research and application prospects. While the speed and computing power of microprocessors continue to grow at an ever-increasing pace, the demand to intelligently and adaptively deal with the complex, fuzzy, and often ill-defined world around us remains to a large extent unaddressed. Powerful, highly parallel computing paradigms such as neural networks promise to have a major impact in addressing these needs. Papers in the workshop proceedings highlight benefits of neural networks in real-world applications compared to conventional computing techniques. Topics include fault diagnosis, pattern recognition, and multiparameter optimization.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This intern report consists of the workshop handbook for the Comprehensive Environmental and Natural Resource Management Planning workshop presented by the Council of Energy Resource Tribes. The workshop objectives were to foster and awareness of integrated resource management rationale; present the fundamental elements of an integrated approach; explain what distinguishes this approach from mainstream strategies; discuss how worldview and philosophy shape action and policy; present ways in which philosophical dexterity promotes effective management; and identify opportunities to engage and participate in integrated management. Resource articles presented at the meeting have been removed for separate processing for inclusion on the datamore » base.« less
Workshop Report on Managing Solar Radiation
NASA Technical Reports Server (NTRS)
Lane, Lee (Compiler); Caldeira, Ken (Compiler); Chatfield, Robert (Compiler); Langhoff, Stephanie (Compiler)
2007-01-01
The basic concept of managing Earth's radiation budget is to reduce the amount of incoming solar radiation absorbed by the Earth so as to counterbalance the heating of the Earth that would otherwise result from the accumulation of greenhouse gases. The workshop did not seek to decide whether or under what circumstances solar radiation management should be deployed or which strategies or technologies might be best, if it were deployed. Rather, the workshop focused on defining what kinds of information might be most valuable in allowing policy makers more knowledgeably to address the various options for solar radiation management.
Instructor guide : managing operating cost for rural and small urban transit systems.
DOT National Transportation Integrated Search
2013-01-01
The purpose of the workshop is to provide rural and small urban transit managers and staff with tools to analyze, track, predict, and manage operational costs. The workshop will have a beginning and ending general session, and will provide six sessio...
ERIC Educational Resources Information Center
Morrison, James L.; Ashley, William C.
This handbook was designed to accompany a three-day workshop for senior administrators in higher education on proactive management techniques in higher education. Proactive management allows for anticipating change and managing uncertainty in place of crisis management or reactive actions. The workshop covered: (1) strategic thinking; (2)…
Jiang, Luohua; Smith, Matthew Lee; Chen, Shuai; Ahn, SangNam; Kulinski, Kristie P.; Lorig, Kate; Ory, Marcia G.
2015-01-01
Background: The Chronic Disease Self-Management Program (CDSMP) has been widely disseminated among various racial and ethnic populations. In addition to the six required CDSMP workshop sessions, the delivery sites have the option to offer a Session Zero (or zero class), an information session offered prior to Session One as a marketing tool. Despite assumptions that a zero class is helpful, little is known about the prevalence of these additional sessions or their impact on retaining participants in CDSMP workshops. This study aims to describe the proportion of CDSMP workshops that offered Session Zero and examine the association between Session Zero and workshop completion rates. Methods: Data were analyzed from 80,987 middle-aged and older adults collected during a two-year national dissemination of CDSMP. Generalized estimating equation regression analyses were conducted to assess the association between Session Zero and successful workshop completion (attending four or more of the six workshop sessions). Results: On average, 21.04% of the participants attended workshops that offered Session Zero, and 75.33% successfully completed the CDSMP workshop. The participants of the workshops that offered Session Zero had significantly higher odds of completing CDSMP workshops than those who were not offered Session Zero (OR = 1.099, P = <0.001) after controlling for participants’ demographic characteristics, race, ethnicity, living status, household income, number of chronic conditions, and workshop delivery type. Conclusion: As one of the first studies reporting the importance of an orientation session for participant retention in chronic disease management intervention projects, our findings suggest offering an orientation session may increase participant retention in similar translational efforts. PMID:25964918
Low-Power Fault Tolerance for Spacecraft FPGA-Based Numerical Computing
2006-09-01
Ranganathan , “Power Management – Guest Lecture for CS4135, NPS,” Naval Postgraduate School, Nov 2004 [32] R. L. Phelps, “Operational Experiences with the...4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...undesirable, are not necessarily harmful. Our intent is to prevent errors by properly managing faults. This research focuses on developing fault-tolerant
Analytical Approaches to Guide SLS Fault Management (FM) Development
NASA Technical Reports Server (NTRS)
Patterson, Jonathan D.
2012-01-01
Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).
Nondeterministic Approaches and Their Potential for Future Aerospace Systems
NASA Technical Reports Server (NTRS)
Noor, Ahmed K. (Compiler)
2001-01-01
This document contains the proceedings of the Training Workshop on Nondeterministic Approaches and Their Potential for Future Aerospace Systems held at NASA Langley Research Center, Hampton, Virginia, May 30-3 1, 2001. The workshop was jointly sponsored by Old Dominion University's Center for Advanced Engineering Environments and NASA. Workshop attendees were from NASA, other government agencies, industry, and universities. The objectives of the workshop were to give overviews of the diverse activities in nondeterministic approaches, uncertainty management methodologies, reliability assessment and risk management techniques, and to identify their potential for future aerospace systems.
Research and Teaching About the Deep Earth
NASA Astrophysics Data System (ADS)
Williams, Michael L.; Mogk, David W.; McDaris, John
2010-08-01
Understanding the Deep Earth: Slabs, Drips, Plumes and More; Virtual Workshop, 17-19 February and 24-26 February 2010; Images and models of active faults, subducting plates, mantle drips, and rising plumes are spurring new excitement about deep-Earth processes and connections between Earth's internal systems and plate tectonics. The new results and the steady progress of Earthscope's USArray across the country are also providing a special opportunity to reach students and the general public. The pace of discoveries about the deep Earth is accelerating due to advances in experimental, modeling, and sensing technologies; new data processing capabilities; and installation of new networks, especially the EarthScope facility. EarthScope is an interdisciplinary program that combines geology and geophysics to study the structure and evolution of the North American continent. To explore the current state of deep-Earth science and ways in which it can be brought into the undergraduate classroom, 40 professors attended a virtual workshop given by On the Cutting Edge, a program that strives to improve undergraduate geoscience education through an integrated cooperative series of workshops and Web-based resources. The 6-day two-part workshop consisted of plenary talks, large and small group discussions, and development and review of new classroom and laboratory activities.
Boyce, A M; Turner, A; Watts, L; Forestier-Zhang, L; Underhill, A; Pinedo-Villanueva, R; Monsell, F; Tessaris, D; Burren, C; Masi, L; Hamdy, N; Brandi, M L; Chapurlat, R; Collins, M T; Javaid, Muhammad Kassim
2017-12-01
To develop consensus on improving the management of patients, we convened an international workshop involving patients, clinicians, and researchers. Key findings included the diagnostic delay and variability in subsequent management with agreement to develop an international natural history study. We now invite other stakeholders to join the partnership. The aim of this study was develop a consensus on how to improve the management of patients with fibrous dysplasia and prioritize areas for research METHODS: An international workshop was held over 3 days involving patients, clinicians, and researchers. Each day had a combination of formal presentations and facilitated discussions that focused on clinical pathways and research. The patient workshop day highlighted the variability of patients' experience in getting a diagnosis, the knowledge of general clinical staff, and understanding long-term outcomes. The research workshop prioritized collaborations that improved understanding of the contemporary natural history of fibrous dysplasia/McCune-Albright syndrome (FD/MAS). The clinical workshop outlined the key issues around diagnostics, assessment of severity, treatment and monitoring of patients. In spite of advances in understanding the genetic and molecular underpinnings of fibrous dysplasia/McCune-Albright syndrome, clinical management remains a challenge. From the workshop, a consensus was reached to create an international, multi-stakeholder partnership to advance research and clinical care in FD/MAS. We invite other stakeholders to join the partnership.
Towards the assessment and management of contaminated dredged materials.
Agius, Suzanne J; Porebski, Linda
2008-04-01
Environment Canada's Disposal at Sea Programme hosted the Contaminated Dredged Material Management Decisions Workshop in Montreal, Quebec, Canada, on 28-30 November 2006. The workshop brought together over 50 sediment assessment and management experts from academic, industrial, and regulatory backgrounds and charged them with drafting a potential framework to assess contaminated dredged materials and compare the risks of various disposal alternatives. This article summarizes the recommendations made during the workshop concerning the development of sediment assessment tools, the interpretation of these tools, and the essential attributes of a comparative risk assessment process. The major outcomes of the workshop include a strong recommendation to develop a national dredging or sediment management strategy, a potential decision-making framework for the assessment of dredged materials and comparative risk assessment of disposal options, and the expansion of minimum sediment characterization requirements for nonroutine disposal permit applications.
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2011 CFR
2011-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2010 CFR
2010-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2013 CFR
2013-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2012 CFR
2012-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
ERIC Educational Resources Information Center
Smith, Lee W.; Muntone, John C.
A final report and compendium of presentation papers and related materials on a management workshop for institutional administrators in optometric and podiatric education is presented. Place and dates of the workshop are listed as are the participants, and the program agenda is provided. A synopsis of the curriculum content of the workshop…
Seth M. White
2004-01-01
In March and April of 2003, over 250 managers, researchers, and other participants gathered for a series of workshops at Oregon State University, the University of Arizona, and Colorado State University, near the largest wildfires of 2002. In response to the need for better understanding of large fires, the Wildland Fire Workshops were designed to create an atmosphere...
Lane G. Eskew; David R. DeYoe; Denver P. Burns; Jean-Claude Mercier
1999-01-01
The purpose of this workshop was to develop organizational networks to help achieve best practices in management and leadership of forest research and foster continuous learning toward that goal through organizational benchmarking. The papers and notes herein document the presentations and discussions of the workshop.
Christian Messier; John Zasada; David Greene
1999-01-01
The three review papers presented in this issue of the Canadian Journal of Forest Research follow a 1-day workshop that was held in Montreal in early January 1997 entitled Functional Aspects of Regeneration In the Boreal Forest in the Context of Sustainable Forest Management. This workshop was held as part of the regeneration working group of Canada...
ERIC Educational Resources Information Center
Association of Physical Plant Administrators of Universities and Colleges, Washington, DC.
In response to a request from the Wisconsin Department of Natural Resources, Region V of the United States Environmental Protection Agency (EPA) sponsored a workshop on waste management in universities and colleges. It consisted of four sessions: (1) managing general university waste and regulatory concerns; (2) chemical waste management; (3)…
Nuccio, Vito F.; D'Erchia, Frank D.; Parady, K.(compiler); Mellinger, A.
2010-01-01
The U.S. Geological Survey (USGS) hosted the second Wyoming Landscape Conservation Initiative (WLCI) Science and Management Workshop at the University of Wyoming Conference Center and Hilton Garden Inn on May 12, 13, and 14, 2009, in Laramie, Wyo. The workshop focused on six topics seen as relevant to ongoing WLCI science and management activities: mapping and modeling resources for decisionmaking; data information and management; fish and wildlife research; changing landscapes; monitoring; and reclamation and offsite mitigation. Panelists gave presentations on ongoing research in these six areas during plenary sessions followed by audience discussions. Three breakout groups focused on discussing wildlife, reclamation, and monitoring. Throughout the plenary sessions, audience discussions, and breakout groups, several needs were repeatedly emphasized by panelists and workshop participants: developing a conservation plan and identifying priority areas and species for conservation actions; gaining a deeper understanding of sagebrush ecology; identifying thresholds for wildlife that can be used to create an 'early warning system' for managers; continuing to collect basic data across the landscape; facilitating even greater communication and partnership across agencies and between scientists and land managers; and engaging proactively in understanding new changes on the landscape such as wind energy development and climate change. Detailed proceedings from the workshop are captured and summarized in this report.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
...] Medical Device Quality System Regulation Educational Forum on Risk Management Through the Product Life...), is announcing a public workshop entitled ``Medical Device Quality System Regulation Educational Forum on Risk Management through the Product Life Cycle.'' This public workshop is intended to provide...
Preparing project managers for faster-better-cheaper robotic planetary missions
NASA Technical Reports Server (NTRS)
Gowler, P.; Atkins, K.
2003-01-01
The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.
Stress Audits as a Precursor to Stress Management Workshops: An Evaluation of the Process.
ERIC Educational Resources Information Center
Ormond, Wayne E.; Keown-Gerrard, Janine L.; Kline, Theresa
2003-01-01
A stress audit assessing potential stressors; stress perceptions, responses, and outcomes; and personal, group, and situational characteristics was conducted in stress management workshops for 20 employees. New skills and attitudes for dealing with stress were taught: time management, communication, alternatives to negative attitudes, and…
2010-02-01
Feb 2010 2010 Coalition Battle Management Language Workshop (Atelier 2010 sur le langage de gestion du champ de bataille pour les opérations en...RTO MEETING PROCEEDINGS MP-MSG-079 2010 Coalition Battle Management Language Workshop (Atelier 2010 sur le langage de gestion du champ de ...RTO-MP-MSG-079 ES - 3 Atelier 2010 sur le langage de gestion du champ de bataille pour les opérations en coalition (RTO-MP-MSG-079
Domen, Ronald E; Talbert, Michael L; Johnson, Kristen; Post, Miriam D; Brissette, Mark D; Conran, Richard Michael; Hoffman, Robert D; McCloskey, Cindy B; Raciti, Patricia M; Roberts, Cory Anthony; Rojiani, Amyn M; Tucker, J Allan; Powell, Suzanne Zein-Eldin
2015-01-01
Professionalism issues are common in residency training and can be very difficult to recognize and manage. Almost one-third of the milestones for pathology recently instituted by the Accreditation Council for Graduate Medical Education encompass aspects of professionalism. Program directors are often unsure of how and when to remediate residents for unprofessional behavior. We used a case-based educational approach in a workshop setting to assist program directors in the management of unprofessional behavior in residents. Eight case scenarios highlighting various aspects of unprofessional behavior by pathology residents were developed and presented in an open workshop forum at the annual pathology program director's meeting. Prior to the workshop, 2 surveys were conducted: (1) to collect data on program directors' experience with identifying, assessing, and managing unprofessional behavior in their residents and (2) to get feedback from workshop registrants on how they would manage each of the 8 case scenarios. A wide range of unprofessional behaviors have been observed by pathology program directors. Although there is occasionally general agreement on how to manage specific behaviors, there remains wide variation in how to manage many of the presented unprofessional behaviors. Remediation for unprofessional behavior in pathology residents remains a difficult and challenging process. Additional education and research in this area are warranted.
SSHAC Workshop 1 - November 15-18, 2010 | NGA East
(2:00-4:30) Methods for finite fault simulations 2:00-3:00 Methods considered: description of selected methods (2.Yuehua Zeng; Sim WG) 3:00-3:30 Discussion 3:30-3:45 Break 3:45-4:00 Discussion: Capture of representative methods 4:00-4:30 Summary of today's key issues (3.Norman Abrahamson) 4:30-5:00
European Science Notes Information Bulletin Reports on Current European/ Middle Eastern Science
1991-04-01
Fault tolerance Technology and VLSIIWSI Implementation 10th IFAC2 Workshop on Distributed Computer Optimal designs Commercial and experimental Control...catalysts that would facilitate cooperation between applications experts and computer architects in designing and implementing a new generation of parallel...speculative. Sediments immediately north of Iceland are up to 1-km However, they demonstrate the methodology for thick but thin rapidly to less than 200-m
Workshop on a Cross Section of Archean Crust
NASA Technical Reports Server (NTRS)
Ashwal, L. D. (Editor); Card, K. D. (Editor)
1983-01-01
Various topics relevant to crustal genesis, especially the relationship between Archean low - and high-grade terrains, were discussed. The central Superior Province of the Canadian Shield was studied. Here a 120 km-wide transition from subgreenschist facies rocks of the Michipicoten greenstone belt to granulite facies rocks of the Kapuskasing structural zone represents an oblique cross section through some 20 km of crust, uplifted along a northwest-dipping thrust fault.
A policy model to initiate environmental negotiations: Three hydropower workshops
Lamb, Berton Lee; Taylor, Jonathan G.; Burkardt, Nina; Ponds, Phadrea D.
1998-01-01
How do I get started in natural resource negotiations? Natural resource managers often face difficult negotiations when they implement laws and policies regulating such resources as water, wildlife, wetlands, endangered species, and recreation. As a result of these negotiations, managers must establish rules, grant permits, or create management plans. The Legal‐Institutional Analysis Model (LIAM) was designed to assist managers in systematically analyzing the parties in natural resource negotiations and using that analysis to prepare for bargaining. The LIAM relies on the theory that organizations consistently employ behavioral roles. The model uses those roles to predict likely negotiation behavior. One practical use of the LIAM is when all parties to a negotiation conduct a workshop as a way to open the bargaining on a note of trust and mutual understanding. The process and results of three LIAM workshops designed to guide hydroelectric power licensing negotiations are presented. Our experience with these workshops led us to conclude that the LIAM can be an effective tool to begin a negotiation and that trust built through the workshops can help create a successful result.
Proceedings from a one-day workshop cosponsored by US EPA Office of Economy and Environment and National Center for Environmental Research and the National Science Foundation Decision, Risk,and Management Science Program on community-based decision making
77 FR 2040 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
... workshop. The workshop topic is volunteer angler data collection. DATES: The meeting will be held on...: (302) 526-5255. SUPPLEMENTARY INFORMATION: The workshop will include briefings on established volunteer... volunteer angler data collections and their uses. This workshop is a product of the Marine Recreational...
A Linguistic Foundation for Communicating Geo-Information in the context of BML and geoBML
2010-03-23
BML Standard. 2009 Spring Simulation Interoperability Workshop (09S- SIW -046). San Diego, CA. Rein, K., Schade, U. & Hieb, M.R. (2009). Battle...Formalizing Battle Management Language: A Grammar for Specifying Orders. 2006 Spring Simulation Interoperability Workshop (06S- SIW - 068). Huntsville...Hieb, M.R. (2007). Battle Management Language: A Grammar for Specifying Reports. 2007 Spring Simulation Interoperability Workshop (07S- SIW -036
Summary of the 2012 Wide Area Recovery and Resiliency Program (WARRP) Waste Management Workshop
Workshop advanced the planning of federal, state and local officials in the area of waste management following a chemical, biological or radiological wide-area incident in the Denver, Colorado urban area.
ERIC Educational Resources Information Center
Simerly, Robert G.
This book shows how to design and implement a strategic financial management system for any organization that plans conferences, workshops, and meetings. It guides the reader through steps in the budgeting and strategic financial management process. Case studies, hints, and guidelines for avoiding the most common mistakes are given, and…
Managing for wildlife habitat in Westside production forests.
Timothy B. Harrington; Gretchen E. Nicholas
2007-01-01
On October 18, 2006, a workshop was held in Vancouver, WA, with the title "Managing for wildlife habitat in Westside production forests." The purpose of the workshop was to provide prescriptions and guidelines for people who manage Westside forests (those west of the Cascade Mountains' crest) primarily for wood production, but because of mandate or...
Defining wilderness quality: the role of standards in wilderness managementa workshop proceedings.
B. Shelby; G. Stankey; B. Shindler
1992-01-01
Integral to maintaining wilderness quality is the implementation of ecological, social, and management standards. A substantial body of wilderness research management experience exists nationwide as a common-pool resource for professionals with a specialized interest in incorporating standards into planning processes. In a 2-day interactive workshop, wilderness...
Leadership Strategies for Department Chairs and Program Directors: A Case Study Approach.
ERIC Educational Resources Information Center
Comer, Robert W.; Haden, N. Karl; Taylor, Robert L.; Thomas, D. Denee
2002-01-01
Reviews leadership challenges and management concepts in academic dentistry as they were applied in a case-based faculty development workshop, in order to provide a foundation for three cases that follow in subsequent articles. The workshop was structured to address leadership challenges relating to managing people, mission management, conflict…
NASA Technical Reports Server (NTRS)
Hayashi, Miwa; Ravinder, Ujwala; McCann, Robert S.; Beutter, Brent; Spirkovska, Lily
2009-01-01
Performance enhancements associated with selected forms of automation were quantified in a recent human-in-the-loop evaluation of two candidate operational concepts for fault management on next-generation spacecraft. The baseline concept, called Elsie, featured a full-suite of "soft" fault management interfaces. However, operators were forced to diagnose malfunctions with minimal assistance from the standalone caution and warning system. The other concept, called Besi, incorporated a more capable C&W system with an automated fault diagnosis capability. Results from analyses of participants' eye movements indicate that the greatest empirical benefit of the automation stemmed from eliminating the need for text processing on cluttered, text-rich displays.
International development workshops. Final technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-08-06
The US Department of Energy (DOE) and the Nuclear Energy Agency of the Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA) began to act on their recognition of the importance of education in nuclear literacy, specifically in radioactive waste management (RWM), several years ago. To address this Goal for nuclear literacy, the US DOE; through the Information and Education Division of the Office of Civilian Radioactive Waste Management (OCRWM) and in cooperation with the OECD/NEA, organized an ``International Workshop on Education in the Field of Radioactive Waste Management`` in Engelberg, Switzerland in June of 1991. To this end, amore » grant to support nuclear literacy and RWM was written and funded by the OCRWM and the education division of the DOE Yucca Mountain Office in 1990. The over-riding Goal of that workshop and the DOE grant was to find ways of raising the level of nuclear literacy in the general public through educational programs in radioactive waste management (RWM). The two Main Objectives of the workshop were: first, to contribute to an information base for education systems, on global aspects of radioactive waste management; and second, to achieve international consensus on the basic tools and methods required to develop the information base. These two objectives also became the principal objectives of the DOE International Workshops grant. In other words, the global and local (Nevada) objectives were one and the same. Workshop overviews and accomplishments are summarized in this report.« less
Report of the workshop on Aviation Safety/Automation Program
NASA Technical Reports Server (NTRS)
Morello, Samuel A. (Editor)
1990-01-01
As part of NASA's responsibility to encourage and facilitate active exchange of information and ideas among members of the aviation community, an Aviation Safety/Automation workshop was organized and sponsored by the Flight Management Division of NASA Langley Research Center. The one-day workshop was held on October 10, 1989, at the Sheraton Beach Inn and Conference Center in Virginia Beach, Virginia. Participants were invited from industry, government, and universities to discuss critical questions and issues concerning the rapid introduction and utilization of advanced computer-based technology into the flight deck and air traffic controller workstation environments. The workshop was attended by approximately 30 discipline experts, automation and human factors researchers, and research and development managers. The goal of the workshop was to address major issues identified by the NASA Aviation Safety/Automation Program. Here, the results of the workshop are documented. The ideas, thoughts, and concepts were developed by the workshop participants. The findings, however, have been synthesized into a final report primarily by the NASA researchers.
Third U.S. Geological Survey Wildland Fire-Science Workshop : Denver, Colorado, November 12-15, 2002
Livingston, Russell K.
2004-01-01
Executive Summary -- The historically significant wildland fire events that occurred in the United States during 2000 and 2002, together with the associated recognition of the need for a different national policy of forest management, has led to an increased awareness of the need for cooperative effort among all Federal agencies in planning for and managing the risks and consequences of wildland fire. The expertise and capabilities of the U.S. Geological Survey (USGS) are significant resources in this regard, and the agency is becoming increasingly involved in fire-science activities in support of the various land-management agencies that are dealing directly with this issue. The First USGS Wildland Fire Workshop was held in Sioux Falls, South Dakota, in 1997 and helped to establish the direction of USGS in sharing its expertise with the fire-management agencies. The Second USGS Wildland Fire Workshop was held in Los Alamos, New Mexico, in 2000 and brought together all the agencies involved in the management of wildland fires in order to determine their needs, to demonstrate USGS capabilities to meet those needs, and to establish methods for the USGS to distribute data and tools useful in fire management. It enhanced the relationships developed during the 1997 workshop and helped to define USGS' role in the fire-management community. The Third USGS Wildland Fire-Science Workshop, held in Denver, Colorado, November 12?15, 2002, was an opportunity for exchange of information on recent progress in the area of fire science and to determine the gaps in fire-science research that could be addressed by the USGS. In addition to more than 90 USGS scientists engaged in fire-related research and managers of organizational units involved in some aspect of wildland fire activities, the workshop was attended by about 30 representatives of 11 other Federal agencies. There also were a number of attendees affiliated with several universities, private companies, and State and local agencies. The 4-day meeting consisted of a pre-workshop field trip to the Hayman Fire area, several keynote presentations, five panel discussions, presentation and 'breakout' discussion of four 'white paper' topics, and a poster session with more than 30 presentations.
Implementation of Integrated System Fault Management Capability
NASA Technical Reports Server (NTRS)
Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark
2008-01-01
Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.
Survivable algorithms and redundancy management in NASA's distributed computing systems
NASA Technical Reports Server (NTRS)
Malek, Miroslaw
1992-01-01
The design of survivable algorithms requires a solid foundation for executing them. While hardware techniques for fault-tolerant computing are relatively well understood, fault-tolerant operating systems, as well as fault-tolerant applications (survivable algorithms), are, by contrast, little understood, and much more work in this field is required. We outline some of our work that contributes to the foundation of ultrareliable operating systems and fault-tolerant algorithm design. We introduce our consensus-based framework for fault-tolerant system design. This is followed by a description of a hierarchical partitioning method for efficient consensus. A scheduler for redundancy management is introduced, and application-specific fault tolerance is described. We give an overview of our hybrid algorithm technique, which is an alternative to the formal approach given.
A workshop on asthma management programs and centers in Brazil: reviewing and explaining concepts.
Stelmach, Rafael; Cerci Neto, Alcindo; Fonseca, Ana Cristina de Carvalho Fernandez; Ponte, Eduardo Vieira; Alves, Gerardo; Araujo-Costa, Ildely Niedia; Lasmar, Laura Maria de Lima Belizário Facury; Castro, Luci Keiko Kuromoto de; Lenz, Maria Lucia Medeiros; Silva, Paulo; Cukier, Alberto; Alves, Alexssandra Maia; Lima-Matos, Aline Silva; Cardoso, Amanda da Rocha Oliveira; Fernandes, Ana Luisa Godoy; São-José, Bruno Piassi de; Riedi, Carlos Antônio; Schor, Deborah; Peixoto, Décio Medeiros; Brandenburg, Diego Djones; Camillo, Elineide Gomes Dos Santos; Serpa, Faradiba Sarquis; Brandão, Heli Vieira; Lima, João Antonio Bonfadini; Pio, Jorge Eduardo; Fiterman, Jussara; Anderson, Maria de Fátima; Cardoso, Maria do Socorro de Lucena; Rodrigues, Marcelo Tadday; Pereira, Marilyn Nilda Esther Urrutia; Antila, Marti; Martins, Sonia Maria; Guimarães, Vanessa Gonzaga Tavares; Mello, Yara Arruda Marques; Andrade, Wenderson Clay Correia de; Salibe-Filho, William; Caldeira, Zelina Maria da Rocha; Cruz-Filho, Álvaro Augusto Souza da; Camargos, Paulo
2015-01-01
To report the results of a workshop regarding asthma management programs and centers (AMPCs) in Brazil, so that they can be used as a tool for the improvement and advancement of current and future AMPCs. The workshop consisted of five presentations and the corresponding group discussions. The working groups discussed the following themes: implementation of asthma management strategies; human resources needed for AMPCs; financial resources needed for AMPCs; and operational maintenance of AMPCs. The workshop involved 39 participants, from all regions of the country, representing associations of asthma patients (n = 3), universities (n = 7), and AMPCs (n = 29). We found a direct relationship between a lack of planning and the failure of AMPCs. Based on the experiences reported during the workshop, the common assumptions about AMPCs in Brazil were the importance of raising awareness of managers; greater community participation; interdependence between primary care and specialized care; awareness of regionalization; and use of medications available in the public health system. Brazil already has a core of experience in the area of asthma management programs. The implementation of strategies for the management of chronic respiratory disease and their incorporation into health care system protocols would seem to be a natural progression. However, there is minimal experience in this area. Joint efforts by individuals with expertise in AMPCs could promote the implementation of asthma management strategies, thus speeding the creation of treatment networks, which might have a multiplier effect, precluding the need for isolated centers to start from zero.
2009-09-01
this information supports the decison - making process as it is applied to the management of risk. 2. Operational Risk Operational risk is the threat... reasonability . However, to make a software system fault tolerant, the system needs to recognize and fix a system state condition. To detect a fault, a fault...Tracking ..........................................51 C. DECISION- MAKING PROCESS................................................................51 1. Risk
Formal Validation of Fault Management Design Solutions
NASA Technical Reports Server (NTRS)
Gibson, Corrina; Karban, Robert; Andolfato, Luigi; Day, John
2013-01-01
The work presented in this paper describes an approach used to develop SysML modeling patterns to express the behavior of fault protection, test the model's logic by performing fault injection simulations, and verify the fault protection system's logical design via model checking. A representative example, using a subset of the fault protection design for the Soil Moisture Active-Passive (SMAP) system, was modeled with SysML State Machines and JavaScript as Action Language. The SysML model captures interactions between relevant system components and system behavior abstractions (mode managers, error monitors, fault protection engine, and devices/switches). Development of a method to implement verifiable and lightweight executable fault protection models enables future missions to have access to larger fault test domains and verifiable design patterns. A tool-chain to transform the SysML model to jpf-Statechart compliant Java code and then verify the generated code via model checking was established. Conclusions and lessons learned from this work are also described, as well as potential avenues for further research and development.
ERIC Educational Resources Information Center
Meeks, Suzanne; Burton, Elizabeth G.
2004-01-01
Depression is a prevalent and serious problem among nursing home residents. Nursing home staff members are gatekeepers for mental health treatment for residents, but may know little about depression and its management. We evaluated a didactic workshop for nursing home staff on depressive symptoms and management. Results for 58 staff participants…
Identifying research needs for improved management of social impacts in wilderness recreation
Gordon R. Cessford
2000-01-01
This paper summarizes the social impact research and information needs derived from a workshop of over 50 recreation management staff in the New Zealand Department of Conservation. The overall objective was to establish the basis for developing a research plan underpinning social impact management. After scoping the diversity of social impact issues, the workshop...
1982-12-01
FIRST PRINTING RESOURCES Final - MANAGEMENT INFORMATION SYSTEM (PRMIS) COST AND FINANCIAL WORKSHOP 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(@) I...NPPS). Cost and Financial (C&F) is a subsystem of the proposed second Printing Resources Management Information System (PRMIS II). The objectives of the
Fault displacement hazard assessment for nuclear installations based on IAEA safety standards
NASA Astrophysics Data System (ADS)
Fukushima, Y.
2016-12-01
In the IAEA Safety NS-R-3, surface fault displacement hazard assessment (FDHA) is required for the siting of nuclear installations. If any capable faults exist in the candidate site, IAEA recommends the consideration of alternative sites. However, due to the progress in palaeoseismological investigations, capable faults may be found in existing site. In such a case, IAEA recommends to evaluate the safety using probabilistic FDHA (PFDHA), which is an empirical approach based on still quite limited database. Therefore a basic and crucial improvement is to increase the database. In 2015, IAEA produced a TecDoc-1767 on Palaeoseismology as a reference for the identification of capable faults. Another IAEA Safety Report 85 on ground motion simulation based on fault rupture modelling provides an annex introducing recent PFDHAs and fault displacement simulation methodologies. The IAEA expanded the project of FDHA for the probabilistic approach and the physics based fault rupture modelling. The first approach needs a refinement of the empirical methods by building a world wide database, and the second approach needs to shift from kinematic to the dynamic scheme. Both approaches can complement each other, since simulated displacement can fill the gap of a sparse database and geological observations can be useful to calibrate the simulations. The IAEA already supported a workshop in October 2015 to discuss the existing databases with the aim of creating a common worldwide database. A consensus of a unified database was reached. The next milestone is to fill the database with as many fault rupture data sets as possible. Another IAEA work group had a WS in November 2015 to discuss the state-of-the-art PFDHA as well as simulation methodologies. Two groups jointed a consultancy meeting in February 2016, shared information, identified issues, discussed goals and outputs, and scheduled future meetings. Now we may aim at coordinating activities for the whole FDHA tasks jointly.
Fish stocking in protected areas: Summary of a workshop
Corn, Paul Stephen; Knapp, Roland A.
2000-01-01
Native and nonnative sport fish have been introduced into the majority of historically fishless lakes in wilderness, generating conflicts between managing wilderness as natural ecosystems and providing opportunities for recreation. Managers faced with controversial and difficult decisions about how to manage wilderness lakes may not always have ready access to research relevant to these decisions. To address this problem, and to expose scientists to the concerns and constraints of managers and wilderness users, a workshop was held in October 1998 at the Flathead Lake Biological Station in Polson, Montana. Participants included 43 scientists, state and federal managers, wilderness users and advocates and students. Four subject areas were addressed: federal, state, tribal and user perspectives, community and ecosystem effects, species effects and management recommendations. Papers from the workshop are being developed for an issue of the journal Ecosystems.
Getting to the future through silviculture - Workshop proceedings
Dennis Murphy
1992-01-01
Includes 19 papers documenting presentations at the 1991 Forest Service National Silviculture Workshop. Discussions focus on the role of silviculture in New Perspectives (ecosystem management), new approaches to the practice of silviculture, and examples of successful integration of practices into multi resource management.
Panel: Eco-informatics and decision making managing our natural resources
Gushing, J.B.; Wilson, T.; Martin, F.; Schnase, J.; Spengler, S.; Sugarbaker, L.; Pardo, T.
2006-01-01
This panel responds to the December 2004 workshop on Eco-Informatics and Decision Making [1], which addressed how informatics tools can help with better management of natural resources and policy making. The workshop was jointly sponsored by the NSF, NBII, NASA, and EPA. Workshop participants recommended that informatics research in four IT areas be funded: modeling and simulation, data quality, information integration and ontologies, and social and human aspects. Additionally, they recommend that funding agencies provide infrastructure and some changes in funding habits to assure cycles of innovation in the domain were addressed. This panel brings issues raised in that workshop to the attention of digital government researchers.
The workload analysis in welding workshop
NASA Astrophysics Data System (ADS)
Wahyuni, D.; Budiman, I.; Tryana Sembiring, M.; Sitorus, E.; Nasution, H.
2018-03-01
This research was conducted in welding workshop which produces doors, fences, canopies, etc., according to customer’s order. The symptoms of excessive workload were seen from the fact of employees complaint, requisition for additional employees, the lateness of completion time (there were 11 times of lateness from 28 orders, and 7 customers gave complaints). The top management of the workshop assumes that employees’ workload was still a tolerable limit. Therefore, it was required workload analysis to determine the number of employees required. The Workload was measured by using a physiological method and workload analysis. The result of this research can be utilized by the workshop for a better workload management.
Proceedings and findings of the geothermal commercialization workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, J.; Dhillon, H.
The proceedings are presented of a Geothermal Commercialization Workshop conducted by the Division of Geothermal Resource Management, Department of Energy. The workshop was held in January-February 1979 at The MITRE Corporation facility in McLean, Virginia. The workshop addressed geothermal hydrothermal commercialization achievements and needs in the areas of Marketing and Outreach, Economics, Scenarios, and Progress Monitoring.
Breaking down barriers in cooperative fault management: Temporal and functional information displays
NASA Technical Reports Server (NTRS)
Potter, Scott S.; Woods, David D.
1994-01-01
At the highest level, the fundamental question addressed by this research is how to aid human operators engaged in dynamic fault management. In dynamic fault management there is some underlying dynamic process (an engineered or physiological process referred to as the monitored process - MP) whose state changes over time and whose behavior must be monitored and controlled. In these types of applications (dynamic, real-time systems), a vast array of sensor data is available to provide information on the state of the MP. Faults disturb the MP and diagnosis must be performed in parallel with responses to maintain process integrity and to correct the underlying problem. These situations frequently involve time pressure, multiple interacting goals, high consequences of failure, and multiple interleaved tasks.
Redundancy management for efficient fault recovery in NASA's distributed computing system
NASA Technical Reports Server (NTRS)
Malek, Miroslaw; Pandya, Mihir; Yau, Kitty
1991-01-01
The management of redundancy in computer systems was studied and guidelines were provided for the development of NASA's fault-tolerant distributed systems. Fault recovery and reconfiguration mechanisms were examined. A theoretical foundation was laid for redundancy management by efficient reconfiguration methods and algorithmic diversity. Algorithms were developed to optimize the resources for embedding of computational graphs of tasks in the system architecture and reconfiguration of these tasks after a failure has occurred. The computational structure represented by a path and the complete binary tree was considered and the mesh and hypercube architectures were targeted for their embeddings. The innovative concept of Hybrid Algorithm Technique was introduced. This new technique provides a mechanism for obtaining fault tolerance while exhibiting improved performance.
NASA Technical Reports Server (NTRS)
1988-01-01
The Cryogenic Fluid Management Technology Workshop was held April 28 to 30, 1987, at the NASA Lewis Research Center in Cleveland, Ohio. The major objective of the workshop was to identify future NASA needs for technology concerning the management of subcritical cryogenic fluids in the low-gravity space environment. In addition, workshop participants were asked to identify those technologies which will require in-space experimentation and thus are candidates for inclusion in the flight experiment being defined at Lewis. The principal application for advanced fluid management technology is the Space-Based Orbit Transfer Vehicle (SBOTV) and its servicing facility, the On-Orbit Cryogenic Fuel Depot (OOCFD). Other potential applications include the replenishment of cryogenic coolants (with the exception of superfluid helium), reactants, and propellants on board a variety of spacecraft including the space station and space-based weapon systems. The last day was devoted to a roundtable discussion of cryogenic fluid management technology requirements by 30 representatives from NASA, industry, and academia. This volume contains a transcript of the discussion of the eight major technology categories.
A Test Case for the Source Inversion Validation: The 2014 ML 5.5 Orkney, South Africa Earthquake
NASA Astrophysics Data System (ADS)
Ellsworth, W. L.; Ogasawara, H.; Boettcher, M. S.
2017-12-01
The ML5.5 earthquake of August 5, 2014 occurred on a near-vertical strike slip fault below abandoned and active gold mines near Orkney, South Africa. A dense network of surface and in-mine seismometers recorded the earthquake and its aftershock sequence. In-situ stress measurements and rock samples through the damage zone and rupture surface are anticipated to be available from the "Drilling into Seismogenic Zones of M2.0-M5.5 Earthquakes in South African gold mines" project (DSeis) that is currently progressing toward the rupture zone (Science, doi: 10.1126/science.aan6905). As of 24 July, 95% of drilled core has been recovered from a 427m-section of the 1st hole from 2.9 km depth with minimal core discing and borehole breakouts. A 2nd hole is planned to intersect the fault at greater depth. Absolute differential stress will be measured along the holes and frictional characteristics of the recovered core will be determined in the lab. Surface seismic reflection data and exploration drilling from the surface down to the mining horizon at 3km depth is also available to calibrate the velocity structure above the mining horizon and image reflective geological boundaries and major faults below the mining horizon. The remarkable quality and range of geophysical data available for the Orkney earthquake makes this event an ideal test case for the Source Inversion Validation community using actual seismic data to determine the spatial and temporal evolution of earthquake rupture. We invite anyone with an interest in kinematic modeling to develop a rupture model for the Orkney earthquake. Seismic recordings of the earthquake and information on the faulting geometry can be found in Moyer et al. (2017, doi: 10.1785/0220160218). A workshop supported by the Southern California Earthquake Center will be held in the spring of 2018 to compare kinematic models. Those interested in participating in the modeling exercise and the workshop should contact the authors for additional information.
Diabetic foot workshop: Improving technical and educational skills for nurses.
Aalaa, Maryam; Sanjari, Mahnaz; Shahbazi, Samimeh; Shayeganmehr, Zahra; Abooeirad, Maryam; Amini, Mohammad Reza; Adibi, Hossien; Mehrdad, Neda
2017-01-01
Diabetes mellitus as one of the most common metabolic disorders has some complications, one of the main ones is diabetic foot (DF). Appropriate care and education prevents 85% of diabetic foot amputations. An ideal management to prevent and treat diabetic foot necessitates a close collaboration between the health team members and the diabetic patient. Therefore, improving nurses' knowledge about DF care and advancement in the quality of care provided by the nurses could significantly improve diabetic foot prevention and management. Therefore, the aim of DF workshop was to improve technical and educational skills of the nurses to prevent and manage diabetic foot. Considering the vital role of the nurses in providing DF care, EMRI decided to conduct Diabetic foot workshop for them. The following five steps were designed for the 14 coordinating sessions in the workshop: Goals definition, deciding about attendees, location selection, creating agenda, and developing a follow-up plan. "Diabetic Foot Workshop for Nurses" provides appropriate training to DF nurses at the national level; and combining theory and practice in this workshop not only increases nurses' knowledge, but also improves their skills in the field of the diabetic foot. Providing education and care to patients by DF nurse specialists instead of general nurses could be an important output of this workshop, which may lead to DF prevention and amputation decrease in the long term.
PROCEEDINGS OF A WORKSHOP ON SUSPENDED SEDIMENTS AND SOLIDS
The Workshop on Suspended Sediments and Solids was held on July 11-12, 2002 in Cincinnati, Ohio. The workshop was conducted by the U.S. Environmental Protection Agency's (USEPA) National Risk Management Research Laboratory (NRMRL). Representatives from NRMRL Divisions; other USEP...
DOT National Transportation Integrated Search
2008-06-23
This document presents the notes taken at the USDOT Integrated Corridor Management (ICM) Transit Data Gaps for Rail Transit Systems Initial Planning Workshop. Different scenarios for handling increased demand on rail and bus transit systems are discu...
Merging Two Futures Concepts: Issues Management and Policy Impact Analysis.
ERIC Educational Resources Information Center
Renfro, William L.; Morrison, James L.
1982-01-01
Describes a workshop held during the 1982 World Future Society's Fourth General Assembly on the combined application of issues management and policy impact analysis. The workshop participants applied futures research, forecasting, goal-setting, and policy development techniques to future problems in educational policy. (AM)
A workshop on asthma management programs and centers in Brazil: reviewing and explaining concepts*
Stelmach, Rafael; Neto, Alcindo Cerci; Fonseca, Ana Cristina de Carvalho Fernandez; Ponte, Eduardo Vieira; Alves, Gerardo; Araujo-Costa, Ildely Niedia; Lasmar, Laura Maria de Lima Belizário Facury; de Castro, Luci Keiko Kuromoto; Lenz, Maria Lucia Medeiros; Silva, Paulo; Cukier, Alberto; Alves, Alexssandra Maia; Lima-Matos, Aline Silva; Cardoso, Amanda da Rocha Oliveira; Fernandes, Ana Luisa Godoy; de São-José, Bruno Piassi; Riedi, Carlos Antônio; Schor, Deborah; Peixoto, Décio Medeiros; Brandenburg, Diego Djones; Camillo, Elineide Gomes dos Santos; Serpa, Faradiba Sarquis; Brandão, Heli Vieira; Lima, João Antonio Bonfadini; Pio, Jorge Eduardo; Fiterman, Jussara; Anderson, Maria de Fátima; Cardoso, Maria do Socorro de Lucena; Rodrigues, Marcelo Tadday; Pereira, Marilyn Nilda Esther Urrutia; Antila, Marti; Martins, Sonia Maria; Guimarães, Vanessa Gonzaga Tavares; Mello, Yara Arruda Marques; de Andrade, Wenderson Clay Correia; Salibe-Filho, William; Caldeira, Zelina Maria da Rocha; da Cruz-Filho, Álvaro Augusto Souza; Camargos, Paulo
2015-01-01
Objective: To report the results of a workshop regarding asthma management programs and centers (AMPCs) in Brazil, so that they can be used as a tool for the improvement and advancement of current and future AMPCs. Methods: The workshop consisted of five presentations and the corresponding group discussions. The working groups discussed the following themes: implementation of asthma management strategies; human resources needed for AMPCs; financial resources needed for AMPCs; and operational maintenance of AMPCs. Results: The workshop involved 39 participants, from all regions of the country, representing associations of asthma patients (n = 3), universities (n = 7), and AMPCs (n = 29). We found a direct relationship between a lack of planning and the failure of AMPCs. Based on the experiences reported during the workshop, the common assumptions about AMPCs in Brazil were the importance of raising awareness of managers; greater community participation; interdependence between primary care and specialized care; awareness of regionalization; and use of medications available in the public health system. Conclusions: Brazil already has a core of experience in the area of asthma management programs. The implementation of strategies for the management of chronic respiratory disease and their incorporation into health care system protocols would seem to be a natural progression. However, there is minimal experience in this area. Joint efforts by individuals with expertise in AMPCs could promote the implementation of asthma management strategies, thus speeding the creation of treatment networks, which might have a multiplier effect, precluding the need for isolated centers to start from zero. PMID:25750669
Fit for work? Evaluation of a workshop for rheumatology teams.
Cohen, D; Khan, S; Marfell, N
2016-06-01
People with rheumatoid arthritis (RA) may rapidly cease work prematurely due to ill-health. A recent survey noted that a quarter of respondents with RA experienced job loss within a year of diagnosis and 50% stopped work within 6 years. To develop and pilot workshops to increase the knowledge, skills and confidence of rheumatology team members to support work-related issues in outpatient clinics. A 3-h interactive workshop, informed by rheumatology experts and the Royal College of General Practitioners (RCGP) National Education Programme (NEP) about work and health, was developed to address both knowledge and skills in the management of health and work consultations in an outpatient setting. Questionnaires were developed for use pre- and immediately post-workshop, with questions that focused on the confidence of delegates in managing these discussions and the importance they placed upon them. Ninety-nine participants attended five workshops throughout the UK between 2013 and 2104. Seventy-three per cent (72) completed the post-workshop questionnaire. Eighty-nine per cent found the workshop useful or very useful, 88% found it relevant or very relevant and 79% responded that it had an impact or a considerable impact on their practice. Wilcoxon matched pairs signed rank tests were carried out that showed an overall increase in confidence after training. The results suggest that the workshop was both relevant and useful to participants and had an impact on their practice. This was true for all specialities. The workshops also highlighted participants' desire to understand how to use the 'fit note' to enhance their patient management. © The Author 2015. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Enhancement of the national strong-motion network in Turkey
Gulkan, Polat; Ceken, U.; Colakoglu, Z.; Ugras, T.; Kuru, T.; Apak, A.; Anderson, J.G.; Sucuoglu, H.; Celebi, M.; Akkar, D.S.; Yazgan, U.; Denizlioglu, A.Z.
2007-01-01
Two arrays comprising 20 strong-motion sensors were established in western Turkey. The 14 stations of BYTNet follow a N-S trending line about 65 km in length, normal to strands of the North Anatolian fault that runs between the cities of Bursa and Yalova. Here the dominant character of the potential fault movement is a right-lateral transform slip. The DATNet array, comprising a total of eight stations, is arranged along a 110-km-long E-W trending direction along the Menderes River valley between Denizli and Aydin. (Two stations in this array were incorporated from the existing Turkish national strong-motion network.) This is an extensional tectonic environment, and the network mornitors potential large normal-faulting earthquakes on the faults in the valley. The installation of the arrays was supported by the North Atlantic Treaty Organization (NATO) under its Science for Peace Program. Maintenance and calibration is performed by the General Directorate of Disaster Affairs (GDDA) according to a protocol between Middle East Technical University (METU) and GDDA. Many young engineers and scientists have been trained in network operation and evaluation during the course of the project, and an international workshop dealing with strong-motion instrumentation has been organized as part of the project activities.
Helium isotope study of geothermal features in Chile with field and laboratory data
Dobson, Patrick
2013-02-11
Helium isotope and stable isotope data from the El Tatio, Tinginguirica, Chillan, and Tolhuaca geothermal systems, Chile. Data from this submission are discussed in: Dobson, P.F., Kennedy, B.M., Reich, M., Sanchez, P., and Morata, D. (2013) Effects of volcanism, crustal thickness, and large scale faulting on the He isotope signatures of geothermal systems in Chile. Proceedings, 38th Workshop on Geothermal Reservoir Engineering, Stanford University, Feb. 11-13, 2013
Geo-electromagnetic research aids geo-hazard mitigation
NASA Astrophysics Data System (ADS)
Chiappini, M.; Carmisciano, C.; Faggioni, O.
Some 100 Earth scientists from nine different nations recently gathered in Lerici, Italy; for the Second International Workshop on Geo-Electro-Magnetism. While this was not a thematic meeting, most of the 40 papers presented focused on applications of electromagnetic methods to natural or man-made hazards such as known faults, seismically active regions, volcanoes, landslides, and environmental or civil engineering problems. Anomaly and main field studies, both field investigations and theoretical techniques, were also well represented.
76 FR 56742 - Mid-Atlantic Fishery Management Council; Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
...), preventing overfishing, maximum sustainable yield, and achieving rebuilding targets, and reports on stock... single species and ecosystem based fishery management. Therefore, the purpose of this workshop is to... Australia; 9:30 a.m.--Status report from each SSC on approaches being taken to implement ABCs and providing...
Management Basics for Minority Women. Facilitator's Manual.
ERIC Educational Resources Information Center
Jackson, Stanlie M., Ed.
This facilitator's manual consists of guidelines and materials for use in conducting a workshop dealing with three management basics for minority women--communication, decision making, and interpersonal skills. Covered in the first half of the manual are the following aspects of implementing the workshop: background on the need for and development…
Carl M. Berntsen; A. P. Mustian; Carter B. Gibbs; David A. Marquis; Donald T. Gordon; Jerry F. Franklin; Marvin W. Foiles; Robert O. Curtis; Dale O. Hall; Robert R. Alexander; Carleton B. Edminster; Robert E. Phares
1977-01-01
The 1976 National Silviculture Workshop was held in Eugene, Oregon, on October 13-15, 1976. The objectives were to discuss second growth management of individual stands, with particular emphasis on the control of stand density.
Twenty-Second Annual NASA Supply and Equipment Management Conference
NASA Technical Reports Server (NTRS)
1989-01-01
The status of actions from the 1988 conference is reviewed. Environmental safety issues, definitions, and regulations; contract transition, payload logistics transition, and safety and support equipment; supply products and services, bar code technology, and inventory accuracy; equipment management workshop topics; and contract property workshop topics are outlined.
Operator Performance Evaluation of Fault Management Interfaces for Next-Generation Spacecraft
NASA Technical Reports Server (NTRS)
Hayashi, Miwa; Ravinder, Ujwala; Beutter, Brent; McCann, Robert S.; Spirkovska, Lilly; Renema, Fritz
2008-01-01
In the cockpit of the NASA's next generation of spacecraft, most of vehicle commanding will be carried out via electronic interfaces instead of hard cockpit switches. Checklists will be also displayed and completed on electronic procedure viewers rather than from paper. Transitioning to electronic cockpit interfaces opens up opportunities for more automated assistance, including automated root-cause diagnosis capability. The paper reports an empirical study evaluating two potential concepts for fault management interfaces incorporating two different levels of automation. The operator performance benefits produced by automation were assessed. Also, some design recommendations for spacecraft fault management interfaces are discussed.
Operations management system advanced automation: Fault detection isolation and recovery prototyping
NASA Technical Reports Server (NTRS)
Hanson, Matt
1990-01-01
The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.
Health management and controls for Earth-to-orbit propulsion systems
NASA Astrophysics Data System (ADS)
Bickford, R. L.
1995-03-01
Avionics and health management technologies increase the safety and reliability while decreasing the overall cost for Earth-to-orbit (ETO) propulsion systems. New ETO propulsion systems will depend on highly reliable fault tolerant flight avionics, advanced sensing systems and artificial intelligence aided software to ensure critical control, safety and maintenance requirements are met in a cost effective manner. Propulsion avionics consist of the engine controller, actuators, sensors, software and ground support elements. In addition to control and safety functions, these elements perform system monitoring for health management. Health management is enhanced by advanced sensing systems and algorithms which provide automated fault detection and enable adaptive control and/or maintenance approaches. Aerojet is developing advanced fault tolerant rocket engine controllers which provide very high levels of reliability. Smart sensors and software systems which significantly enhance fault coverage and enable automated operations are also under development. Smart sensing systems, such as flight capable plume spectrometers, have reached maturity in ground-based applications and are suitable for bridging to flight. Software to detect failed sensors has reached similar maturity. This paper will discuss fault detection and isolation for advanced rocket engine controllers as well as examples of advanced sensing systems and software which significantly improve component failure detection for engine system safety and health management.
Scharer, Katherine M.; Salisbury, J. Barrett; Arrowsmith, J. Ramon; Rockwell, Thomas K.
2014-01-01
In southern California, where fast slip rates and sparse vegetation contribute to crisp expression of faults and microtopography, field and high‐resolution topographic data (<1 m/pixel) increasingly are used to investigate the mark left by large earthquakes on the landscape (e.g., Zielke et al., 2010; Zielke et al., 2012; Salisbury, Rockwell, et al., 2012, Madden et al., 2013). These studies measure offset streams or other geomorphic features along a stretch of a fault, analyze the offset values for concentrations or trends along strike, and infer that the common magnitudes reflect successive surface‐rupturing earthquakes along that fault section. Wallace (1968) introduced the use of such offsets, and the challenges in interpreting their “unique complex history” with offsets on the Carrizo section of the San Andreas fault; these were more fully mapped by Sieh (1978) and followed by similar field studies along other faults (e.g., Lindvall et al., 1989; McGill and Sieh, 1991). Results from such compilations spurred the development of classic fault behavior models, notably the characteristic earthquake and slip‐patch models, and thus constitute an important component of the long‐standing contrast between magnitude–frequency models (Schwartz and Coppersmith, 1984; Sieh, 1996; Hecker et al., 2013). The proliferation of offset datasets has led earthquake geologists to examine the methods and approaches for measuring these offsets, uncertainties associated with measurement of such features, and quality ranking schemes (Arrowsmith and Rockwell, 2012; Salisbury, Arrowsmith, et al., 2012; Gold et al., 2013; Madden et al., 2013). In light of this, the Southern San Andreas Fault Evaluation (SoSAFE) project at the Southern California Earthquake Center (SCEC) organized a combined field activity and workshop (the “Fieldshop”) to measure offsets, compare techniques, and explore differences in interpretation. A thorough analysis of the measurements from the field activity will be provided separately; this paper discusses the complications presented by such offset measurements using two channels from the San Andreas fault as illustrative cases. We conclude with best approaches for future data collection efforts based on input from the Fieldshop.
ARGES: an Expert System for Fault Diagnosis Within Space-Based ECLS Systems
NASA Technical Reports Server (NTRS)
Pachura, David W.; Suleiman, Salem A.; Mendler, Andrew P.
1988-01-01
ARGES (Atmospheric Revitalization Group Expert System) is a demonstration prototype expert system for fault management for the Solid Amine, Water Desorbed (SAWD) CO2 removal assembly, associated with the Environmental Control and Life Support (ECLS) System. ARGES monitors and reduces data in real time from either the SAWD controller or a simulation of the SAWD assembly. It can detect gradual degradations or predict failures. This allows graceful shutdown and scheduled maintenance, which reduces crew maintenance overhead. Status and fault information is presented in a user interface that simulates what would be seen by a crewperson. The user interface employs animated color graphics and an object oriented approach to provide detailed status information, fault identification, and explanation of reasoning in a rapidly assimulated manner. In addition, ARGES recommends possible courses of action for predicted and actual faults. ARGES is seen as a forerunner of AI-based fault management systems for manned space systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lumsdaine, Andrew
2013-03-08
The main purpose of the Coordinated Infrastructure for Fault Tolerance in Systems initiative has been to conduct research with a goal of providing end-to-end fault tolerance on a systemwide basis for applications and other system software. While fault tolerance has been an integral part of most high-performance computing (HPC) system software developed over the past decade, it has been treated mostly as a collection of isolated stovepipes. Visibility and response to faults has typically been limited to the particular hardware and software subsystems in which they are initially observed. Little fault information is shared across subsystems, allowing little flexibility ormore » control on a system-wide basis, making it practically impossible to provide cohesive end-to-end fault tolerance in support of scientific applications. As an example, consider faults such as communication link failures that can be seen by a network library but are not directly visible to the job scheduler, or consider faults related to node failures that can be detected by system monitoring software but are not inherently visible to the resource manager. If information about such faults could be shared by the network libraries or monitoring software, then other system software, such as a resource manager or job scheduler, could ensure that failed nodes or failed network links were excluded from further job allocations and that further diagnosis could be performed. As a founding member and one of the lead developers of the Open MPI project, our efforts over the course of this project have been focused on making Open MPI more robust to failures by supporting various fault tolerance techniques, and using fault information exchange and coordination between MPI and the HPC system software stack from the application, numeric libraries, and programming language runtime to other common system components such as jobs schedulers, resource managers, and monitoring tools.« less
Isayama, Tetsuya; Ye, Xiang Y; Tokumasu, Hironobu; Chiba, Hiroo; Mitsuhashi, Hideko; Shahrook, Sadequa; Kusuda, Satoshi; Fujimura, Masanori; Toyoshima, Katsuaki; Mori, Rintaro
2015-05-08
Clinical guidelines assist physicians to make decisions about suitable healthcare. We conducted a controlled before-and-after study to investigate the impact of professional-led guideline workshops for patent ductus arteriosus (PDA) management on physicians' clinical practices, discharge mortality, and associated morbid conditions among preterm neonates. We recruited physicians practicing at two neonatal intensive care units (NICUs) in Japan and used the data of all neonates weighing less than or equal to 1,500 g admitted to 90 NICUs (2 intervention NICUs and 88 control NICUs) in the Neonatal Research Network of Japan from April 2008 to March 2010. We held 1-day workshops for physicians on PDA clinical practice guidelines at the two intervention NICUs. Physicians' skills assessed by confidence rating (CR) scores and the Sheffield Peer Review Assessment Tool (SPRAT) were compared between pre- and post-workshop month at the intervention NICUs using Wilcoxon signed-rank tests. Neonatal discharge mortality and morbidity were compared between pre- and post-workshop year at both the intervention and control NICUs using multivariable regression analyses adjusting for potential confounders. Fifteen physicians were included in the study. Physicians' CR scores (2.14 vs. 2.47, p = 0.02) and SPRAT (4.14 vs. 4.50, p = 0.05) in PDA management improved after the workshops. The analyses of neonatal outcomes included 294 and 6,234 neonates in the intervention and control NICUs, respectively. Neonates' discharge mortality declined sharply at the intervention NICUs (from 15/146 to 5/148, relative risk reduction -0.67; adjusted odds ratio 0.30, 95% confidence interval 0.10 to 0.89) during the post-workshop period. The mortality reduction was much greater than that in the control NICUs (from 207/3,322 to 147/2,912, relative risk reduction -0.19; adjusted odds ratio 0.75, 95% confidence interval 0.59 to 0.95), although the difference between the intervention and control NICUs were not statistically significant. Overall, physicians' confidence in PDA management improved after attending guideline workshops. Face-to-face workshops by guideline developers can be a useful strategy to improve physicians' PDA management skills and, thereby, might reduce PDA-associated mortality in preterm neonates.
Technologies for unattended network operations
NASA Technical Reports Server (NTRS)
Jaworski, Allan; Odubiyi, Jide; Holdridge, Mark; Zuzek, John
1991-01-01
The necessary network management functions for a telecommunications, navigation and information management (TNIM) system in the framework of an extension of the ISO model for communications network management are described. Various technologies that could substantially reduce the need for TNIM network management, automate manpower intensive functions, and deal with synchronization and control at interplanetary distances are presented. Specific technologies addressed include the use of the ISO Common Management Interface Protocol, distributed artificial intelligence for network synchronization and fault management, and fault-tolerant systems engineering.
Fiscal Officer Training Workshop, 1997. Participant's Guide.
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
Extensive workshop materials are presented in this 1997 training guide for fiscal officers, business officers, bursars, loan managers, and others who have responsibility for Title IV college student financial aid programs. Workbook type material is provided for nine workshop sessions that cover the following topics: (1) Institutional…
Workshop Report On Sustainable Urban Development
NASA Technical Reports Server (NTRS)
Langhoff, Stephanie; Martin, Gary; Barone, Larry; Wagener, Wolfgang
2010-01-01
The key workshop goal was to explore and document how NASA technologies, such as remote sensing, climate modeling, and high-end computing and visualization along with NASA assets such as Earth Observing Satellites (EOS) and Unmanned Aerial Vehicles (UAVs) can contribute to creating and managing a sustainable urban environment. The focus was on the greater Bay Area, but many aspects of the workshop were applicable to urban management at the local, regional and global scales. A secondary goal was to help NASA better understand the problems facing urban managers and to make city leaders in the Bay Area more aware of NASA's capabilities. By bringing members of these two groups together we hope to see the beginnings of new collaborations between NASA and those faced with instituting sustainable urban management in Bay Area cities.
Optimal Management of Redundant Control Authority for Fault Tolerance
NASA Technical Reports Server (NTRS)
Wu, N. Eva; Ju, Jianhong
2000-01-01
This paper is intended to demonstrate the feasibility of a solution to a fault tolerant control problem. It explains, through a numerical example, the design and the operation of a novel scheme for fault tolerant control. The fundamental principle of the scheme was formalized in [5] based on the notion of normalized nonspecificity. The novelty lies with the use of a reliability criterion for redundancy management, and therefore leads to a high overall system reliability.
Krest, S.K.; Linder, G.; Sparling, D.W.; Linder, Gregory L.; Krest, Sherry K.; Sparling, Donald W.; Little, Edward E.
2003-01-01
Numerous studies have documented the decline of amphibian populations over the past decade and no single factor has been the linked to these widespread declines. Determining the causes of declining amphibian populations worldwide has proven difficult because of the variety of anthropogenic and natural suspect agents. A Wingspread workshop, convened by The Society of Environmental Toxicology and Chemistry (SETAC), brought together individuals with expertise in the areas of amphibian biology, ecotoxicology, natural resource management, and environmental policy. This workshop had three objectives: 1) create a network for future discussions on multiple stressor causes of declines; 2) characterize and prioritize technical issues critical to the analysis of the decline problem; and 3) identify and develop resource management approaches to promote sustainable and healthy amphibian populations. The workshop proceedings will be summarized in a book entitled, 'Multiple Stressors and Declining Amphibian Populations: Evaluating Cause and Effect.' This paper summarizes the results of the workshop.
Krest, S.K.; Linder, G.; Sparling, D.W.; ,
2003-01-01
Numerous studies have documented the decline of amphibian populations over the past decade and no single factor has been the linked to these widespread declines. Determining the causes of declining amphibian populations worldwide has proven difficult because of the variety of anthropogenic and natural suspect agents. A Wingspread workshop, convened by The Society of Environmental Toxicology and Chemistry (SETAC), brought together individuals with expertise in the areas of amphibian biology, ecotoxicology, natural resource management, and environmental policy. This workshop had three objectives: 1) create a network for future discussions on multiple Stressor causes of declines; 2) characterize and prioritize technical issues critical to the analysis of the decline problem; and 3) identify and develop resource management approaches to promote sustainable and healthy amphibian populations. The workshop proceedings will be summarized in a book entitled, "Multiple Stressors and Declining Amphibian Populations: Evaluating Cause and Effect." This paper summarizes the results of the workshop.
Wenning, R. J.; Ingersoll, Christopher G.
2002-01-01
This publication summarizes the results of a Pellston Workshop sponsored by the Society of Environmental Toxicology and Chemistry (SETAC), held 17-22 August 2002 in Fairmont, Montana, USA. The full technical proceedings of the workshop will be published separately by SET AC in 2003. Previous SETAC workshops have focused on sediment ecological risk assessment (ERA) (Dickson et al. 1987; Ingersoll et al. 1997) and porewater toxicity testing (Carr and Nipper 2003). Another recent workshop addressed the application of weight-of-evidence (WOE) methods in ERA (Burton et al. 2002). These previous workshops focused on how, when, and why ERAs are needed in sediment assessments. However, more focused discussion among scientists, environmental regulators, and environmental managers is now needed to build on this previous work. Specifically, additional guidance is needed on procedures that can be used to integrate the information derived from multiple chemical and biological lines of evidence (LOE). These LOE, which are developed through the application of different assessment tools, often include the use of chemically based sediment quality guidelines (SQGs) to evaluate sediment contamination and to help practitioners in sediment assessment and management formulate risk management decisions. This workshop focused on evaluation of the scientific foundations supporting different chemically based numeric SQGs and methods to improve the integration of SQGs into different sediment quality assessment frameworks that include information derived from multiple chemical and biological LOE.
INTRODUCTION AND OVERVIEW OF WORKSHOP ON MANAGING ARSENIC RISKS TO THE ENVIRONMENT
The purpose of this workshop will be to serve as a technical forum for the exchange of information on treating arsenic and arsenic compounds. The goals of the workshop are 1) to examine the chemical fundamentals related to arsenic chemistry, speciation, and analytical issues, 2) ...
Proceedings of the Southern States Recreation Research Applications Workshop
H. Ken Cordell; J.W. Rawls; G.M. Broili; [Compilers
1976-01-01
North Carolina State University; the Forest Environment Research Division, USDA Forest Service; and the Southeastern Forest Experiment Station, USDA Forest Service sponsored this regional Workshop for recreation managers and planners in the Southern States. The objectives of the Workshop were to provide for interaction among recreation scientists, extension...
ERIC Educational Resources Information Center
North Dakota State Board for Vocational Education, Bismarck.
The series of programmed teaching guides for the enterprise analysis of selected enterprises was prepared by the participants in a Farm Management Education In-Service Workshop at North Dakota State University. The guide should be useful to teachers of adult Farm Managment classes in helping to teach farmers to make a thorough analysis of the…
The Workshop is designed to achieve three goals:
1. Convey public and private sector perspectives on the management of mercury in products, processes, and wastes;
2. Present ongoing efforts that address mercury prevention, elimination, noncombustion treatment and disposal; ...
ERIC Educational Resources Information Center
Falls, Leigh; Jara, Teresa; Sever, Tim
2009-01-01
Managing change processes, resistance to change, and organizational members' emotional reactions to change are crucial skills for future educational leaders to learn. Our case study is based on a workshop conducted using two experiential exercises to facilitate current educational leadership doctoral students' reflections on their own reactions to…
Proceedings: national workshop on recreation research and management.
Linda E. Kruger; Rhonda Mazza; Kelly Lawrence
2007-01-01
Given increasing need and decreasing capacity, the Forest Service outdoor recreation research program must strategize how best to address current and future priorities. The papers compiled here were presented at the National Workshop on Recreation Research and Management held in Portland, Oregon, February 8-10, 2005. Papers are organized around four themes:...
Silviculture: From the Cradle of Forestry to Ecosystem Management
Louise H. Foley
1994-01-01
The National Silviculture Workshop, hosted by the National Forests in North Carolina, the Southern Region (Region 8), and the Southeastern Forest Experiment Station, was held November 1993 at the Kanuga Conference Center, Hendersonville , NC. The purpose of this workshop was to review , discuss, and share silvicultural research inform ation and management experience...
Proceedings of the Real-Time Systems Engineering Workshop
2001-08-01
real - time systems engineering. The workshop was held as part of the SEI Symposium in...Washington, DC, during September 2000. The objective of the workshop was to identify key issues and obtain feedback from attendees concerning real - time systems engineering...and interoperability. This report summarizes the workshop in terms of foundation, management, and technical topics, and it contains a discussion related to developing a community of interest for real - time systems
Reliability of Fault Tolerant Control Systems. Part 2
NASA Technical Reports Server (NTRS)
Wu, N. Eva
2000-01-01
This paper reports Part II of a two part effort that is intended to delineate the relationship between reliability and fault tolerant control in a quantitative manner. Reliability properties peculiar to fault-tolerant control systems are emphasized, such as the presence of analytic redundancy in high proportion, the dependence of failures on control performance, and high risks associated with decisions in redundancy management due to multiple sources of uncertainties and sometimes large processing requirements. As a consequence, coverage of failures through redundancy management can be severely limited. The paper proposes to formulate the fault tolerant control problem as an optimization problem that maximizes coverage of failures through redundancy management. Coverage modeling is attempted in a way that captures its dependence on the control performance and on the diagnostic resolution. Under the proposed redundancy management policy, it is shown that an enhanced overall system reliability can be achieved with a control law of a superior robustness, with an estimator of a higher resolution, and with a control performance requirement of a lesser stringency.
Failure detection and fault management techniques for flush airdata sensing systems
NASA Technical Reports Server (NTRS)
Whitmore, Stephen A.; Moes, Timothy R.; Leondes, Cornelius T.
1992-01-01
Methods based on chi-squared analysis are presented for detecting system and individual-port failures in the high-angle-of-attack flush airdata sensing system on the NASA F-18 High Alpha Research Vehicle. The HI-FADS hardware is introduced, and the aerodynamic model describes measured pressure in terms of dynamic pressure, angle of attack, angle of sideslip, and static pressure. Chi-squared analysis is described in the presentation of the concept for failure detection and fault management which includes nominal, iteration, and fault-management modes. A matrix of pressure orifices arranged in concentric circles on the nose of the aircraft indicate the parameters which are applied to the regression algorithms. The sensing techniques are applied to the F-18 flight data, and two examples are given of the computed angle-of-attack time histories. The failure-detection and fault-management techniques permit the matrix to be multiply redundant, and the chi-squared analysis is shown to be useful in the detection of failures.
Development of Asset Fault Signatures for Prognostic and Health Management in the Nuclear Industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vivek Agarwal; Nancy J. Lybeck; Randall Bickford
2014-06-01
Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: Diagnostic Advisor, Asset Fault Signature (AFS) Database, Remaining Useful Life Advisor, and Remaining Useful Life Database. This paper focuses on development of asset fault signatures to assess the health status of generator step-up generators and emergency diesel generators in nuclear power plants. Asset fault signatures describe themore » distinctive features based on technical examinations that can be used to detect a specific fault type. At the most basic level, fault signatures are comprised of an asset type, a fault type, and a set of one or more fault features (symptoms) that are indicative of the specified fault. The AFS Database is populated with asset fault signatures via a content development exercise that is based on the results of intensive technical research and on the knowledge and experience of technical experts. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.« less
Design and Evaluation of Fault-Tolerant VLSI/WSI Processor Arrays.
1987-12-31
studies reported in this paper. In Section .3, the reliabuility characteristics of single-level FTPA’s are discusseri. Four different type of FTPA’s are...for processor arrays are proposed and studied . Stu- dies on algorithmic and software aspects relevant to systems are reported in items 4, 5, 8, 12 and...O’Keefe M., and Fortes, J. A. B., "A Comparative Study of Two Systematic Design Methodologies for Systolic Arrays," (Long Version) International Workshop on
Volcanism/tectonics working group summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kovach, L.A.
1995-09-01
This article is a summary of the proceedings of a group discussion which took place at the Workshop on the Role of Natural Analogs in Geologic Disposal of High-Level Nuclear Waste in San Antonio, Texas on July 22-25, 1991. The working group concentrated on the subject of the impacts of earthquakes, fault rupture, and volcanic eruption on the underground repository disposal of high-level radioactive wastes. The tectonics and seismic history of the Yucca Mountain site in Nevada is discussed and geologic analogs to that site are described.
1992-06-01
Technical report, Ecole Polytechnique, Palaiseau, France, July 1991. [Del9l] V. Delacour. Gestion m6moire automatique pour langages de programmation de ...proved transitions. Fundamenta Informaticae , 11(4):433-452, 1988. [21 P. Degano, R. De Nicola, and U. Montanari. CCS is an (augmented) contact free C/E...defined values, here), in which case the de - phic. However we must check the following points. fault value is returned. The membership test might be
Health management and controls for earth to orbit propulsion systems
NASA Technical Reports Server (NTRS)
Bickford, R. L.
1992-01-01
Fault detection and isolation for advanced rocket engine controllers are discussed focusing on advanced sensing systems and software which significantly improve component failure detection for engine safety and health management. Aerojet's Space Transportation Main Engine controller for the National Launch System is the state of the art in fault tolerant engine avionics. Health management systems provide high levels of automated fault coverage and significantly improve vehicle delivered reliability and lower preflight operations costs. Key technologies, including the sensor data validation algorithms and flight capable spectrometers, have been demonstrated in ground applications and are found to be suitable for bridging programs into flight applications.
Hogan, Dianna; Arthaud, Greg; Pattison, Malka; Sayre, Roger G.; Shapiro, Carl
2010-01-01
The analytical framework for understanding ecosystem services in conservation, resource management, and development decisions is multidisciplinary, encompassing a combination of the natural and social sciences. This report summarizes a workshop on 'Developing an Analytical Framework: Incorporating Ecosystem Services into Decision Making,' which focused on the analytical process and on identifying research priorities for assessing ecosystem services, their production and use, their spatial and temporal characteristics, their relationship with natural systems, and their interdependencies. Attendees discussed research directions and solutions to key challenges in developing the analytical framework. The discussion was divided into two sessions: (1) the measurement framework: quantities and values, and (2) the spatial framework: mapping and spatial relationships. This workshop was the second of three preconference workshops associated with ACES 2008 (A Conference on Ecosystem Services): Using Science for Decision Making in Dynamic Systems. These three workshops were designed to explore the ACES 2008 theme on decision making and how the concept of ecosystem services can be more effectively incorporated into conservation, restoration, resource management, and development decisions. Preconference workshop 1, 'Developing a Vision: Incorporating Ecosystem Services into Decision Making,' was held on April 15, 2008, in Cambridge, MA. In preconference workshop 1, participants addressed what would have to happen to make ecosystem services be used more routinely and effectively in conservation, restoration, resource management, and development decisions, and they identified some key challenges in developing the analytical framework. Preconference workshop 3, 'Developing an Institutional Framework: Incorporating Ecosystem Services into Decision Making,' was held on October 30, 2008, in Albuquerque, NM; participants examined the relationship between the institutional framework and the use of ecosystem services in decision making.
Perspectives from the NSF-sponsored workshop on Grand Challenges in Nanomaterials
NASA Astrophysics Data System (ADS)
Hull, Robert
2004-03-01
At an NSF-sponsored workshop in June 2003, about seventy research leaders in the field of nanomaterials met to discuss, explore and identify future new directions and critical needs ("Grand Challenges") for the next decade and beyond. The key pervasive theme that was identified was the need to develop techniques for assembly of nanoscaled materials over multiple lengths scales, at the levels of efficiency, economy, and precision necessary to realize broad new classes of applications in such diverse technologies as electronics, computation, telecommunications, data storage, energy storage / transmission / generation, health care, transportation, civil infrastructure, military applications, national security, and the environment. Elements of this strategy include development of new self-assembly and lithographic techniques; biologically-mediated synthesis; three-dimensional atomic-scale measurement of structure, properties and chemistry; harnessing of the sub-atomic properties of materials such as electron spin and quantum interactions; new computational methods that span all relevant length- and time- scales; a fundamental understanding of acceptable / achievable "fault tolerance" at the nanoscale; and methods for real-time and distributed sensing of nanoscale assembly. A parallel theme was the need to provide education concerning the potential, applications, and benefits of nanomaterials to all components of society and all levels of the educational spectrum. This talk will summarize the conclusions and recommendations from this workshop, and illustrate the future potential of this field through presentation of selected break-through results provided by workshop participants.
Fleet-Wide Prognostic and Health Management Suite: Asset Fault Signature Database
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vivek Agarwal; Nancy J. Lybeck; Randall Bickford
Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: (1) Diagnostic Advisor, (2) Asset Fault Signature (AFS) Database, (3) Remaining Useful Life Advisor, and (4) Remaining Useful Life Database. The paper focuses on the AFS Database of the FW-PHM Suite, which is used to catalog asset fault signatures. A fault signature is a structured representation ofmore » the information that an expert would use to first detect and then verify the occurrence of a specific type of fault. The fault signatures developed to assess the health status of generator step-up transformers are described in the paper. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.« less
Coordinated Fault Tolerance for High-Performance Computing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dongarra, Jack; Bosilca, George; et al.
2013-04-08
Our work to meet our goal of end-to-end fault tolerance has focused on two areas: (1) improving fault tolerance in various software currently available and widely used throughout the HEC domain and (2) using fault information exchange and coordination to achieve holistic, systemwide fault tolerance and understanding how to design and implement interfaces for integrating fault tolerance features for multiple layers of the software stack—from the application, math libraries, and programming language runtime to other common system software such as jobs schedulers, resource managers, and monitoring tools.
Command and Control Workshop: Structures and Processes for R&D Service Delivery
1996-12-01
syndicates. After getting direction from Deputy Chief of Defence Staff (DCDS) and CRAD as well as a panel of senior officers and managers , the workshop...prepared speeches providing direction to the attendees. This was followed by presentations from a panel of senior officers and civilian managers which...On the morning of the final day, the panel of senior officers and managers reconvened to hear summary presentations of the previous days
Leslie Brandt; Chris Swanston; Linda Parker; Maria Janowiak; Richard Birdsey; Louis Iverson; David Mladenoff; Patricia Butler
2012-01-01
Climate change is leading to direct and indirect impacts on forest tree species and ecosystems in northern Wisconsin. Land managers will need to prepare for and respond to these impacts, so we designed a workshop to identify forest management approaches that can enhance the ability of ecosystems in northern Wisconsin to cope with climate change and address how National...
1997-04-25
the community, as with the Systems Engineering Capability Maturity Model ? • Should it be built by a small working group ? • What role should... collaborating on the development of the transition package concept for requirements management with two organizations. When participants in the workshop...34 learning " and approaches it as a qualitative activity among qualified peers [Spendolini 92]. In the spirit of this style of
MEVTV Workshop on Early Tectonic and Volcanic Evolution of Mars
NASA Technical Reports Server (NTRS)
Frey, H. (Editor)
1988-01-01
Although not ignored, the problems of the early tectonic and volcanic evolution of Mars have generally received less attention than those later in the evolution of the planet. Specifically, much attention was devoted to the evolution of the Tharsis region of Mars and to the planet itself at the time following the establishment of this major tectonic and volcanic province. By contrast, little attention was directed at fundamental questions, such as the conditions that led to the development of Tharsis and the cause of the basic fundamental dichotomy of the Martian crust. It was to address these and related questions of the earliest evolution of Mars that a workshop was organized under the auspices of the Mars: Evolution of Volcanism, Tectonism, and Volatiles (MEVTV) Program. Four sessions were held: crustal dichotomy; crustal differentiation/volcanism; Tharsis, Elysium, and Valles Marineris; and ridges and fault tectonics.
Report on Information Systems Workshop (Njiro Hill, Arusha, Tanzania, May 19-31, 1980).
ERIC Educational Resources Information Center
Inganji, Francis, Ed.
With a view to improving information systems and services in Eastern, Central, and Southern Africa, this Information Systems Workshop was organized by the East and Southern African Management Institute (ESAMI) with assistance from the Coordinating Centre for Regional Information Training (CRIT). The specific aims of the workshop were to acquaint…
This workshop was held on March 22-23, 2000, in Baltimore, Maryland. To facilitate discussions of this issue, the workshop combined a series of presentations at plenary sessions, moderated technical sessions and panel discussions. The topics of these presentations focused on trea...
An Evaluation of a Management Development Training Program.
ERIC Educational Resources Information Center
Brademas, D. James
1982-01-01
Studied the effectiveness of a five and one-half day workshop and an alternate three and one-half day workshop on organization development in developing a more democratic style of leadership in Illinois park and recreation supervisory personnel. The shorter workshop resulted in a more positive leadership style change than the longer one. (JJD)
Forest health through silviculture: Proceedings of the 1995 National Silviculture Workshop
Lane G. Eskew
1995-01-01
Includes 32 papers documenting presentations at the 1995 Forest Service National Silviculture Workshop. The workshop's purpose was to review, discuss, and share silvicultural research information and management experience critical to forest health on National Forest System lands and other Federal and private forest lands. Papers focus on the role of natural...
Workshop on Discovery Lessons-Learned
NASA Technical Reports Server (NTRS)
Saunders, M. (Editor)
1995-01-01
As part of the Discovery Program's continuous improvement effort, a Discovery Program Lessons-Learned workshop was designed to review how well the Discovery Program is moving toward its goal of providing low-cost research opportunities to the planetary science community while ensuring continued U.S. leadership in solar system exploration. The principal focus of the workshop was on the recently completed Announcement of Opportunity (AO) cycle, but the program direction and program management were also open to comment. The objective of the workshop was to identify both the strengths and weaknesses of the process up to this point, with the goal of improving the process for the next AO cycle. The process for initializing the workshop was to solicit comments from the communities involved in the program and to use the feedback as the basis for establishing the workshop agenda. The following four sessions were developed after reviewing and synthesizing both the formal feedback received and informal feedback obtained during discussions with various participants: (1) Science and Return on Investment; (2) Technology vs. Risk; Mission Success and Other Factors; (3) Cost; and (4) AO.AO Process Changes and Program Management.
Thinking Like a Scientist: The RITES Path for K-12 Students to Learn the Scientific Method
NASA Astrophysics Data System (ADS)
Murray, D. P.; Dooley, H., Jr.; Cardace, D.
2015-12-01
Bringing Research on Learning to the Geosciences (Manduca et al, 2002) stated that "An overaching goal for geoscience education is to help every student to 'think like a scientist'", and that continues to challenge geoscience education. The Rhode Island Technology Enhanced Science (RITES) project addresses that goal, and this presentation chronicles that successful effort. RITES strives to improve science education by providing professional development (PD) to the majority of science teachers at the 5th through 12th grade levels throughout Rhode Island. The PD is presented through ~forty 2.5 day workshops that emphasize the innovative use of technology and best teaching practices, consistent with the recommendations detailed in Manduca et al (2002). The presentation will focus on two of these workshops that provide middle and high school teachers with strategies and techniques for guiding student-run explorations of earthquakes as a result of tectonic plate movements. Teachers address these topics much as a scientist would by carrying out the following activities: 1) Identifying the relationships between faults, EQs and plate boundaries; 2) Using GPS data to quantify interseismic deformation; 3) Constructing an Earthquake machine; and 4) Scaling their observations from desktop to crustal scale, and (5) Using the results to forecast earthquakes along the SAF and to estimate the magnitude of earthquakes on ancient faults. As it is unrealistic to expect teachers to be able to incorporate all of this material into their syllabi, we have introduced the concept of Subtle Shifts (Exploratorium, 2006) as a means by which they can easily blend workshop material into their existing courses. Teacher surveys reflect a high level of satisfaction (81-100%), and pre- and post-evaluations show significant normalized gains (Hake, 1998), in about 90% of the courses. Moreover, students of RITES teachers demonstrate statistically significant gains in inquiry skills and content knowledge.
Maria K. Janowiak; Christopher W. Swanston; Linda M. Nagel; Christopher R. Webster; Brian J. Palik; Mark J. Twery; John B. Bradford; Linda R. Parker; Andrea T. Hille; Sheela M. Johnson
2011-01-01
Land managers across the country face the immense challenge of developing and applying appropriate management strategies as forests respond to climate change. We hosted a workshop to explore silvicultural strategies for addressing the uncertainties surrounding climate change and forest response in the northeastern and north-central United States. Outcomes of this...
Learning, connecting, reconnecting: Summary of the 2007 National Silviculture Workshop
Russell T. Graham; Theresa B. Jain
2008-01-01
The National Silviculture Workshop's genesis in 1973 was the result of forward thinking individuals within the Timber Management staff of National Forest Systems. Several national issues of the 1970s including, but not limited to: 1) the passing of the National Forest Management Act, 2) the mandate that all timber removal, reforestation, and timber stand...
Applying Knowledge-Based Methods to Design and Implement an Air Quality Workshop
Daniel L. Schmoldt; David L. Peterson
1991-01-01
In response to protection needs in class I wilderness areas, forest land managers of the USDA Forest Service must provide input to regulatory agencies regarding air pollutant impacts on air quality-related values. Regional workshops have been convened for land managers and scientists to discuss the aspects and extent of wilderness protection needs. Previous experience...
Eco-informatics for decision makers advancing a research agenda
Cushing, J.B.; Wilson, T.; Brandt, L.; Gregg, V.; Spengler, S.; Borning, A.; Delcambre, L.; Bowker, G.; Frame, M.; Fulop, J.; Hert, C.; Hovy, E.; Jones, J.; Landis, E.; Schnase, J.L.; Schweik, C.; Sonntag, W.; ,
2005-01-01
Resource managers often face significant information technology (IT) problems when integrating ecological or environmental information to make decisions. At a workshop sponsored by the NSF and USGS in December 2004, university researchers, natural resource managers, and information managers met to articulate IT problems facing ecology and environmental decision makers. Decision making IT problems were identified in five areas: 1) policy, 2) data presentation, 3) data gaps, 4) tools, and 5) indicators. To alleviate those problems, workshop participants recommended specific informatics research in modeling and simulation, data quality, information integration and ontologies, and social and human aspects. This paper reports the workshop findings, and briefly compares these with research that traditionally falls under the emerging eco-informatics rubric. ?? Springer-Verlag Berlin Heidelberg 2005.
A Classfication of Management Teachers
ERIC Educational Resources Information Center
Walker, Bob
1974-01-01
There are many classifications of management teachers today. Each has his style, successes, and faults. Some of the more prominent are: the company man, the mamagement technician, the man of principle, the evangelist, and the entrepreneur. A mixture of these classifications would be ideal since each by itself has its faults. (DS)
Proceedings of the Air Transportation Management Workshop
NASA Technical Reports Server (NTRS)
Tobias, Leonard (Editor); Tashker, Michael G. (Editor); Boyle, Angela M. (Editor)
1995-01-01
The Air Transportation Management (ATM) Workshop was held 31 Jan. - 1 Feb. 1995 at NASA Ames Research Center. The purpose of the workshop was to develop an initial understanding of user concerns and requirements for future ATM capabilities and to initiate discussions of alternative means and technologies for achieving more effective ATM capabilities. The topics for the sessions were as follows: viewpoints of future ATM capabilities, user requirements, lessons learned, and technologies for ATM. In addition, two panel sessions discussed priorities for ATM, and potential contributions of NASA to ATM. The proceedings contain transcriptions of all sessions.
Fault-tolerant processing system
NASA Technical Reports Server (NTRS)
Palumbo, Daniel L. (Inventor)
1996-01-01
A fault-tolerant, fiber optic interconnect, or backplane, which serves as a via for data transfer between modules. Fault tolerance algorithms are embedded in the backplane by dividing the backplane into a read bus and a write bus and placing a redundancy management unit (RMU) between the read bus and the write bus so that all data transmitted by the write bus is subjected to the fault tolerance algorithms before the data is passed for distribution to the read bus. The RMU provides both backplane control and fault tolerance.
Workshop: Western hemisphere network of bird banding programs
Celis-Murillo, A.
2007-01-01
Purpose: To promote collaboration among banding programs in the Americas. Introduction: Bird banding and marking provide indispensable tools for ornithological research, management, and conservation of migratory birds on migratory routes, breeding and non-breeding grounds. Many countries and organizations in Latin America and the Caribbean are in the process of developing or have expressed interest in developing national banding schemes and databases to support their research and management programs. Coordination of developing and existing banding programs is essential for effective data management, reporting, archiving and security, and most importantly, for gaining a fuller understanding of migratory bird conservation issues and how the banding data can help. Currently, there is a well established bird-banding program in the U.S.A. and Canada, and programs in other countries are being developed as well. Ornithologists in many Latin American countries and the Caribbean are interested in using banding and marking in their research programs. Many in the ornithological community are interested in establishing banding schemes and some countries have recently initiated independent banding programs. With the number of long term collaborative and international initiatives increasing, the time is ripe to discuss and explore opportunities for international collaboration, coordination, and administration of bird banding programs in the Western Hemisphere. We propose the second ?Western Hemisphere Network of Bird Banding Programs? workshop, in association with the SCSCB, to be an essential step in the progress to strengthen international partnerships and support migratory bird conservation in the Americas and beyond. This will be the second multi-national meeting to promote collaboration among banding programs in the Americas (the first meeting was held in October 8-9, 2006 in La Mancha, Veracruz, Mexico). The Second ?Western Hemisphere Network of Bird Banding Programs? workshop will continue addressing issues surrounding the coordination of an Americas? approach to bird banding and will review in detail the advances made on the first workshop such as, coordination of bands and markers, coordination in recovery reporting, permit issues, data management and data sharing and archiving, data security, training, etc. Workshop Goals: Build on accomplishments of the network?s first workshop (Oct 8-9, 2006). Identify and explore new opportunities for data sharing, data archiving, data access, training, etc. Initiate strategies to support international collaboration and coordination amongst bird banding programs in the Western Hemisphere. Workshop structure: One day workshop of guided discussions. Participants: Representatives of government agencies, program managers and NGOs.
Pollinator Risk Assessment: an International Workshop
This 2011 Society of Environmental Toxicology and Chemistry (SETAC) workshop brought together statisticians, bee biologists, modelers, beekeepers, risk assessors and risk managers to develop exposure measurement methods and identify pesticide effects.
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Schreckenghost, Debra L.; Woods, David D.; Potter, Scott S.; Johannesen, Leila; Holloway, Matthew; Forbus, Kenneth D.
1991-01-01
Initial results are reported from a multi-year, interdisciplinary effort to provide guidance and assistance for designers of intelligent systems and their user interfaces. The objective is to achieve more effective human-computer interaction (HCI) for systems with real time fault management capabilities. Intelligent fault management systems within the NASA were evaluated for insight into the design of systems with complex HCI. Preliminary results include: (1) a description of real time fault management in aerospace domains; (2) recommendations and examples for improving intelligent systems design and user interface design; (3) identification of issues requiring further research; and (4) recommendations for a development methodology integrating HCI design into intelligent system design.
ERIC Educational Resources Information Center
Caillods, Francoise; And Others
This document provides materials prepared for and discussed at a workshop to analyze the problems facing Central and Eastern European countries in the management of the vocational education and training (VET) system. Part I gives an outline of the major research findings and reflects the discussions of the workshop. "Management of Vocational…
A Fault Oblivious Extreme-Scale Execution Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKie, Jim
The FOX project, funded under the ASCR X-stack I program, developed systems software and runtime libraries for a new approach to the data and work distribution for massively parallel, fault oblivious application execution. Our work was motivated by the premise that exascale computing systems will provide a thousand-fold increase in parallelism and a proportional increase in failure rate relative to today’s machines. To deliver the capability of exascale hardware, the systems software must provide the infrastructure to support existing applications while simultaneously enabling efficient execution of new programming models that naturally express dynamic, adaptive, irregular computation; coupled simulations; and massivemore » data analysis in a highly unreliable hardware environment with billions of threads of execution. Our OS research has prototyped new methods to provide efficient resource sharing, synchronization, and protection in a many-core compute node. We have experimented with alternative task/dataflow programming models and shown scalability in some cases to hundreds of thousands of cores. Much of our software is in active development through open source projects. Concepts from FOX are being pursued in next generation exascale operating systems. Our OS work focused on adaptive, application tailored OS services optimized for multi → many core processors. We developed a new operating system NIX that supports role-based allocation of cores to processes which was released to open source. We contributed to the IBM FusedOS project, which promoted the concept of latency-optimized and throughput-optimized cores. We built a task queue library based on distributed, fault tolerant key-value store and identified scaling issues. A second fault tolerant task parallel library was developed, based on the Linda tuple space model, that used low level interconnect primitives for optimized communication. We designed fault tolerance mechanisms for task parallel computations employing work stealing for load balancing that scaled to the largest existing supercomputers. Finally, we implemented the Elastic Building Blocks runtime, a library to manage object-oriented distributed software components. To support the research, we won two INCITE awards for time on Intrepid (BG/P) and Mira (BG/Q). Much of our work has had impact in the OS and runtime community through the ASCR Exascale OS/R workshop and report, leading to the research agenda of the Exascale OS/R program. Our project was, however, also affected by attrition of multiple PIs. While the PIs continued to participate and offer guidance as time permitted, losing these key individuals was unfortunate both for the project and for the DOE HPC community.« less
technologies. Sunlight Helps Laboratory Get Ready for Y2K - (12/27/99) NREL Hosts Free Workshops on Solar and Hosts Free Workshop on Winterizing Your Home - (9/28/99) R&D 100 Awards Honor NREL Research - (9/21 by Using Solar Power for Disaster Management - (9/3/99) NREL Hosts Free Workshop on Residential Solar
The Effectiveness of Workshops as Managerial Learning Opportunities
ERIC Educational Resources Information Center
Billington, Leo; Neeson, Robyn; Barrett, Rowena
2009-01-01
Purpose: The purpose of this paper is to examine the effectiveness of workshops as a learning tool for small business owner-managers (SBO-Ms). It aims to concentrate on workshops delivered over 18 months from January 2007 to July 2008 as part of several publicly-funded small business development programmes in two Australian local government areas…
Altun, Insaf; Karakoç, Ali
2012-05-01
This study aimed to determine the efficacy of interactive workshop on the management of hypothermia and its impact on pediatric nurses' training. This is a pretest-to-posttest quasi-experimental descriptive study. Thirty pediatric nurses attended an interactive lecture-based interactive workshop on the management of hypothermia. Participants had to accept an invitation to the presentation before the training event. They completed the lecture, and a multiple-choice question test before and after the lecture was given. There was a significant improvement in mean test scores after the lecture when compared with those before the lecture (mean [SD], 15.5 [1.3] vs 5.0 [1.7], P < 0.001). The information gained in this study will be valuable as a baseline for further research and help guide improvements in the management of hypothermia with the ultimate goal of enhancing safe and quality patient care.
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Binge Eating Disorder Related Topics Section Navigation Weight ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Robert Gillespie; Dan Cramsey; Dick Miller; Dennis Hamel; Carl Puuri; F. Bryan Clark; John Erickson; Nelson Loftus; Lloyd Casey; H. Clay Smith; Bob Marquis; Martin Dale; Charles E. McGee; Robert D. Williams; Gayne G. Erdmann; R. M. Godman; Stephen G. Boyce; Paul A. Schrauder; DonaId E. Beck; David A. Marquis; James L. McConnell; Paul S. Debald; David R. Houston; Walter Knapp; Tom Turpin; Warren Bacon; Arnold Schulz
1981-01-01
This year's National Silviculture Workshop was held in Roanoke, Virginia and the Monongahela National Forest. The purpose of the meetings were to discuss current silvicultural issues affecting all Regions and to review in detail the state-of-the-art application of hardwood management in the United States. These proceedings include the presentations of individuals...
Proceedings of the workshop on management of giant sequoia; May 24-25, 1985; Reedley, California
C. Phillip Weatherspoon; Y. Robert Iwamoto; Douglas D. Piirto
1986-01-01
Giant sequoia (Sequoiadendron giganteum [Lindl.] Buchholz) has long been noted for its size and beauty. It is widely planted as an ornamental and increasingly is being utilized for timber production. The workshop was the first ever designed to bring together the state-of-knowledge on giant sequoia and its management. Presentations covered its history...
Forest regeneration at high latitudes: experience from northern Sweden.
Mayo Murray
1981-01-01
The problem of obtaining adequate and economical forest regeneration is of major concern among the managers of high-latitude forest lands. In 1979 forest researchers and managers from Scandinavia and North America held the first of three workshops to address this topic by sharing experiences and research from each county. The first workshop was held in Umei, Sweden in...
A systematic risk management approach employed on the CloudSat project
NASA Technical Reports Server (NTRS)
Basilio, R. R.; Plourde, K. S.; Lam, T.
2000-01-01
The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.
Lloyd, James W; Frawley, Suzanne L; Neer, Charles A; Merle, Christine; Goebel, Richard
2004-01-01
The National Commission on Veterinary Economic Issues (NCVEI) is working to enhance the non-technical skills, knowledge, aptitudes, and attitudes (SKAs) of veterinarians. This report describes the development of an innovative model for teaching the principles of financial management as they apply to the veterinary practice. Zodiak: The Game of Business Finance and Strategy is a "business literacy" game in which players work together in small teams (generally four people) to run a fictional multi-million-dollar company called Zodiak Industries for three "years" in order to learn principles of business finance and strategy. After finishing the 4.5-hour game, participants spend the rest of the workshop making the right "Connections"-exercises designed to connect what they have learned to business strategies, financial statements, and operational tactics drawn from veterinary practice. Issues addressed for the veterinary practice, with parallels drawn to Zodiak, included return on owner investment in a veterinary practice (vs. salary drawn by owner veterinarians); pricing (setting prices, price elasticity of demand, and relationships between volume, quality, and price); human resources and operations management as they relate to profitability and efficiency; cash flow and management of accounts receivable; and commonly used financial benchmarks. Workshop venues have included Michigan State University, The Ohio State University, the University of Illinois, and Purdue University. Financial and in-kind support were provided through partnership with Pharmacia Animal Health (now Pfizer Animal Health) and Hill's Pet Nutrition, Inc. Through course evaluations, participants generally rated the workshop high as an educational experience and indicated that the most important things learned were related to financial management (principles, terminology, and methods). The most enjoyable aspects of the workshop tended to be group discussions, teamwork, the dynamic/interactive environment, and the "game" atmosphere. Based on these experiences, the Zodiak workshop provides a useful model for teaching career development and practice management topics to veterinary students. The business simulation in a workshop format was especially useful for teaching these "non-mainstream" topics, as traditional classroom lecture approaches might not have engaged students sufficiently to achieve effective learning. In addition, the partnership developed between academia and industry offered substantial benefits to both parties. Similar educational approaches should be considered for additional aspects of the non-technical SKAs.
Automatic Fault Characterization via Abnormality-Enhanced Classification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronevetsky, G; Laguna, I; de Supinski, B R
Enterprise and high-performance computing systems are growing extremely large and complex, employing hundreds to hundreds of thousands of processors and software/hardware stacks built by many people across many organizations. As the growing scale of these machines increases the frequency of faults, system complexity makes these faults difficult to detect and to diagnose. Current system management techniques, which focus primarily on efficient data access and query mechanisms, require system administrators to examine the behavior of various system services manually. Growing system complexity is making this manual process unmanageable: administrators require more effective management tools that can detect faults and help tomore » identify their root causes. System administrators need timely notification when a fault is manifested that includes the type of fault, the time period in which it occurred and the processor on which it originated. Statistical modeling approaches can accurately characterize system behavior. However, the complex effects of system faults make these tools difficult to apply effectively. This paper investigates the application of classification and clustering algorithms to fault detection and characterization. We show experimentally that naively applying these methods achieves poor accuracy. Further, we design novel techniques that combine classification algorithms with information on the abnormality of application behavior to improve detection and characterization accuracy. Our experiments demonstrate that these techniques can detect and characterize faults with 65% accuracy, compared to just 5% accuracy for naive approaches.« less
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Staying Active at Any Size Related Topics Section ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Health Tips for Adults Related Topics English English ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Mulshine, James L; Avila, Rick; Yankelevitz, David; Baer, Thomas M; Estépar, Raul San Jose; Ambrose, Laurie Fenton; Aldigé, Carolyn R
2015-05-01
The Prevent Cancer Foundation Lung Cancer Workshop XI: Tobacco-Induced Disease: Advances in Policy, Early Detection and Management was held in New York, NY on May 16 and 17, 2014. The two goals of the Workshop were to define strategies to drive innovation in precompetitive quantitative research on the use of imaging to assess new therapies for management of early lung cancer and to discuss a process to implement a national program to provide high quality computed tomography imaging for lung cancer and other tobacco-induced disease. With the central importance of computed tomography imaging for both early detection and volumetric lung cancer assessment, strategic issues around the development of imaging and ensuring its quality are critical to ensure continued progress against this most lethal cancer.
NASA Astrophysics Data System (ADS)
Zhu, L.; Wang, J.; Daut, G.; Spiess, V.; Haberzettl, T.; Schulze, N.; Ju, J.; Lü, X.; Bergmann, F.; Haberkern, J.; Schwalb, A.; Mäusbacher, R.
2017-12-01
Lake Nam Co (ca. 2000 km2, 4718 m a.s.l., maximum depth: 100 m) is located at the interaction zone of the Westerlies and the Indian monsoon on the central Tibetan Plateau. It was part of a mega-lake during Marine Isotope Stage (MIS) 3 before the Last Glacial Maximum. A long term sedimentary record from Nam Co could therefore provide an excellent paleo-environmental sequence for regional and global comparative studies. This will to deepen our understanding of large scale atmospheric circulation shifts and the environmental links between the Tibetan Plateau at low latitudes and the North Atlantic region at high latitudes. A Nam Co deep drilling will fill the gap in two large scale ICDP/IODP drilling transects (N-S: Lake Baikal, Lake Qinghai, Bay of Bengal; W-E: Lake Van, Lake Issyk-Kul, South China Sea, Lake Towuti), which will show the great significance of monsoon dynamics on a long-term scale. Multidisciplinary researches have been conducted since 2005 by a Sino-German cooperative team. The progresses during the last decade are: 1) Detailed bathymetric surveying, including a shallow sediment profiler investigation (Innomar SES 2000 light, ca. 30 m sediment penetration); 2) Paleo-environmental reconstructions covering the past 24 ka; 3) Modern sediment distribution covering the entire lake; 4) Monitoring including water temperature profiles, sediment traps, seasonal airborne pollen collection; 5) Deep seismic survey penetrating up to 800 meters of lake sediments. Based on sediment rates from reference core NC08/01, seismic results show that an age of 500 ka may be reached at 500 m, and >1 Ma at the observed base. Faulting can be clearly detected in the seismic profiles, especially from MIS 5 to early Holocene, and shows the characteristics of normal faults or strike-slip faults. Both rotation of the layers and the close spacing, along with negative and positive offsets of the faults make a transtensional origin of the basin likely. An ICDP workshop proposal was approved this year (ID: ICDP-2017/10, http://www.icdp-online.org/projects/world/asia/lake-nam-co/). The workshop will likely be held in May 2018 in Beijing, where future scientific objectives, potential coring locations and logistics of a drilling campaign will be intensively discussed to ensure a successful drilling campaign in the near future.
77 FR 47820 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... Science, will hold a workshop entitled ``Modeling Protogynous Hermaphrodite Fishes.'' DATES: The workshop... discuss data needs and modeling strategies. Although non-emergency issues not contained in this agenda may...
Tips for Starting Physical Activity
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Tips to Help You Get Active Starting Physical ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Fit for Two: Tips for Pregnancy
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Health Tips for Pregnant Women Related Topics English ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Stay Fit as You Mature Related Topics Section ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Weight-Loss and Nutrition Myths
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Some Myths about Nutrition & Physical Activity Related Topics ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Health Risks of Being Overweight?
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Health Risks of Being Overweight Related Topics Section ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Crane, Michael; Clayton, Tonya; Raabe, Ellen; Stoker, Jason M.; Handley, Larry; Bawden, Gerald W.; Morgan, Karen; Queija, Vivian R.
2004-01-01
The first United States Geological Survey (USGS) Light Detection And Ranging (lidar) Workshop was held November 20-22, 2002 in St. Petersburg, Florida to bring together scientists and managers from across the agency. The workshop agenda focused on six themes: 1) current and future lidar technologies, 2) lidar applications within USGS science and disciplines, 3) calibration and accuracy assessment, 4) tools for processing and evaluating lidar data sets, 5) lidar data management, and 6) commercial and contracting issues. These six themes served as the topics for workshop plenary sessions as well as the general focus for associated breakout sessions. A number of recommendations are presented regarding the role the USGS should play in the future application and development of lidar technology.
Gold, Diane R; Adamkiewicz, Gary; Arshad, Syed Hasan; Celedón, Juan C; Chapman, Martin D; Chew, Ginger L; Cook, Donald N; Custovic, Adnan; Gehring, Ulrike; Gern, James E; Johnson, Christine C; Kennedy, Suzanne; Koutrakis, Petros; Leaderer, Brian; Mitchell, Herman; Litonjua, Augusto A; Mueller, Geoffrey A; O'Connor, George T; Ownby, Dennis; Phipatanakul, Wanda; Persky, Victoria; Perzanowski, Matthew S; Ramsey, Clare D; Salo, Päivi M; Schwaninger, Julie M; Sordillo, Joanne E; Spira, Avrum; Suglia, Shakira F; Togias, Alkis; Zeldin, Darryl C; Matsui, Elizabeth C
2017-10-01
Environmental exposures have been recognized as critical in the initiation and exacerbation of asthma, one of the most common chronic childhood diseases. The National Institute of Allergy and Infectious Diseases; National Institute of Environmental Health Sciences; National Heart, Lung, and Blood Institute; and Merck Childhood Asthma Network sponsored a joint workshop to discuss the current state of science with respect to the indoor environment and its effects on the development and morbidity of childhood asthma. The workshop included US and international experts with backgrounds in allergy/allergens, immunology, asthma, environmental health, environmental exposures and pollutants, epidemiology, public health, and bioinformatics. Workshop participants provided new insights into the biologic properties of indoor exposures, indoor exposure assessment, and exposure reduction techniques. This informed a primary focus of the workshop: to critically review trials and research relevant to the prevention or control of asthma through environmental intervention. The participants identified important limitations and gaps in scientific methodologies and knowledge and proposed and prioritized areas for future research. The group reviewed socioeconomic and structural challenges to changing environmental exposure and offered recommendations for creative study design to overcome these challenges in trials to improve asthma management. The recommendations of this workshop can serve as guidance for future research in the study of the indoor environment and on environmental interventions as they pertain to the prevention and management of asthma and airway allergies. Published by Elsevier Inc.
Dreissenid mussel research priorities workshop
Sytsma, Mark; Phillips, Stephen; Counihan, Timothy D.
2015-01-01
Currently, dreissenid mussels have yet to be detected in the northwestern part of the United States and western Canada. Infestation of one of the jurisdictions within the mussel-free Pacific Northwest would likely have significant economic, societal and environmental implications for the entire region. Understanding the biology and environmental tolerances of dreissenid mussels, and effectiveness of various management strategies, is key to prevention.On November 4-5, 2015, the Aquatic Bioinvasion Research and Policy Institute and the Center for Lakes and Reservoirs at Portland State University, the US Geological Survey, and the Pacific States Marine Fisheries Commission, convened a Dreissenid Mussel Research Priorities Workshop funded by the Great Northern Landscape Conservation Cooperative. The purpose of the workshop was to review dreissenid research priorities in the 2010 Quagga-Zebra Mussel Action Plan for Western U.S. Waters, reassess those priorities, incorporate new information and emerging trends, and develop priorities to strategically focus research efforts on zebra and quagga mussels in the Pacific Northwest and ensure that future research is focused on the highest priorities. It is important to note that there is some repetition among dreissenid research priority categories (e.g., prevention, detection, control, monitoring, and biology).Workshop participants with research experience in dreissenid mussel biology and management were identified by a literature review. State and federal agency managers were also invited to the workshop to ensure relevancy and practicality of the workshop outcomes. A total of 28 experts (see sidebar) in mussel biology, ecology, and management attended the workshop.
Bridge over troubled waters: A Synthesis Session to connect ...
Lack of access to relevant scientific data has limited decision makers from incorporating scientific information into their management and policy schemes. Yet, there is increasing interest among decision makers and scientists to integrate coastal and marine science into the policy and management process. Strategies designed to build communication between decision makers and scientists can be an effective means to disseminate and/or generate policy relevant scientific information. Here researchers develop, test, and present a workshop model designed to bridge the gap between coastal and marine decision makers and scientists. Researchers identify successful components of such a workshop as well as areas for improvement and recommendations to design and conduct similar workshops in the future. This novel workshop format can be used in other fora to effectively connect decision makers and scientists, and to initiate an iterative process to generate and transfer policy relevant scientific information into evidence-based decisions, an important element in protecting coastal and marine resources. In this paper we develop and present a model for increasing collaboration between scientists and decision makers to promote evidence based decisions. Successes and areas for improvement in the tested model are discussed. This novel workshop model is intended to build and sustain connections, with the ultimate goal of creating better policy and management practices. In a recent
Working at the Ohio Aerospace Institute
NASA Technical Reports Server (NTRS)
Szabo, Hortenzia
2004-01-01
The Ohio Aerospace Institute is a wonderful place to work. I enjoy coming to work everyday knowing that I will be surrounded by smiling faces. My mentor, Mary Auzenne, is the Program Manager of the LERCIP College Internship Program, however, I spend most of my time working with Akua Soadwa, the Assistant Program Manager. She is in charge of planning, coordinating, and managing every event that is involved with the college internship program such as the socials, picnic, banquet, workshops, and research symposium. My job is to make her job easier. I help out with the planning, coordinating, and managing of these events. When I first got on board Akua was in the process of planning the second social for the interns. The social is a way for the interns to interact with one another as well as to find out more about where the other interns are working at NASA. We ordered the food, went shopping, and set up the Guerin House for the party. I made sign-in sheets, which helped us get a rough count of the attendees. The next event was the Technical Presentation Workshop and the Professional Development Workshop. These workshops are designed to enhance skills of the interns. We were there to sign people in and direct them to the room where the presentation was to take place. I also took pictures of the workshop and provided copies for the presenters, as well as our files.
Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)
NASA Technical Reports Server (NTRS)
Witkowski, Mona M.; Huh, Shin M.; Burt, John B.; Webster, Julie L.
2004-01-01
I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.
Comprehensive Fault Tolerance and Science-Optimal Attitude Planning for Spacecraft Applications
NASA Astrophysics Data System (ADS)
Nasir, Ali
Spacecraft operate in a harsh environment, are costly to launch, and experience unavoidable communication delay and bandwidth constraints. These factors motivate the need for effective onboard mission and fault management. This dissertation presents an integrated framework to optimize science goal achievement while identifying and managing encountered faults. Goal-related tasks are defined by pointing the spacecraft instrumentation toward distant targets of scientific interest. The relative value of science data collection is traded with risk of failures to determine an optimal policy for mission execution. Our major innovation in fault detection and reconfiguration is to incorporate fault information obtained from two types of spacecraft models: one based on the dynamics of the spacecraft and the second based on the internal composition of the spacecraft. For fault reconfiguration, we consider possible changes in both dynamics-based control law configuration and the composition-based switching configuration. We formulate our problem as a stochastic sequential decision problem or Markov Decision Process (MDP). To avoid the computational complexity involved in a fully-integrated MDP, we decompose our problem into multiple MDPs. These MDPs include planning MDPs for different fault scenarios, a fault detection MDP based on a logic-based model of spacecraft component and system functionality, an MDP for resolving conflicts between fault information from the logic-based model and the dynamics-based spacecraft models" and the reconfiguration MDP that generates a policy optimized over the relative importance of the mission objectives versus spacecraft safety. Approximate Dynamic Programming (ADP) methods for the decomposition of the planning and fault detection MDPs are applied. To show the performance of the MDP-based frameworks and ADP methods, a suite of spacecraft attitude planning case studies are described. These case studies are used to analyze the content and behavior of computed policies in response to the changes in design parameters. A primary case study is built from the Far Ultraviolet Spectroscopic Explorer (FUSE) mission for which component models and their probabilities of failure are based on realistic mission data. A comparison of our approach with an alternative framework for spacecraft task planning and fault management is presented in the context of the FUSE mission.
ERIC Educational Resources Information Center
Ray, Elizabeth
This document contains the instructional materials developed and presented in workshops on communications skills improvement at a regional hospital. The workshop was designed to help participants gain skills that enable them to do the following: (1) identify and overcome roadblocks to effective communication; (2) decode "hidden messages"; (3)…
Commanding Heterogeneous Multi-Robot Teams
2014-06-01
Coalition Battle Management Language (C-BML) Study Group Report. 2005 Fall Simulation Interoperability Workshop (05F- SIW - 041), Orlando, FL, September...NMSG-085 CIG Land Operation Demonstration. 2013 Spring Simulation Interoperability Workshop (13S- SIW -031), San Diego, CA. April 2013. [4] K...Simulation Interoperability Workshop (10F- SIW -039), Orlando, FL, September 2010. [5] M. Langerwisch, M. Ax, S. Thamke, T. Remmersmann, A. Tiderko
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lesperance, Ann M.; Olson, Jarrod; Godinez, Melanie A.
On March 10, 2010 the workshop titled Social Networking for Emergency Management and Public Safety was held in Seattle, WA. The objective of this workshop was to showcase ways social media networking technologies can be used to support emergency management and public safety operations. The workshop highlighted the current state of social networking and where this dynamic engagement is heading, demonstrated some of the more commonly used technologies, highlighted case studies on how these tools have been used in a variety of jurisdictions and engaged the private sector on how these tools might serve as a conduit for two waymore » communication between with the public sector to address regional recovery issues and decision making.« less
Advanced cloud fault tolerance system
NASA Astrophysics Data System (ADS)
Sumangali, K.; Benny, Niketa
2017-11-01
Cloud computing has become a prevalent on-demand service on the internet to store, manage and process data. A pitfall that accompanies cloud computing is the failures that can be encountered in the cloud. To overcome these failures, we require a fault tolerance mechanism to abstract faults from users. We have proposed a fault tolerant architecture, which is a combination of proactive and reactive fault tolerance. This architecture essentially increases the reliability and the availability of the cloud. In the future, we would like to compare evaluations of our proposed architecture with existing architectures and further improve it.
Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest
1996-01-01
This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...
First Workshop on Convergence and Consolidation towards Standard AAL Platform Services
NASA Astrophysics Data System (ADS)
Lázaro, Juan-Pablo; Guillén, Sergio; Farshchian, Babak; Mikalsen, Marius
The following document describes the call for papers for a workshop based on identifying which are the potential commonalities that are important for an AAL system, so they can be discussed and proposed for opening an standardization process. Groups of components like context-management, user interaction management or semantic description of services are frequent components and technologies that are part of an AAL system.
ERIC Educational Resources Information Center
Peace Corps, Washington, DC. Information Collection and Exchange Div.
A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…
Simple Random Sampling-Based Probe Station Selection for Fault Detection in Wireless Sensor Networks
Huang, Rimao; Qiu, Xuesong; Rui, Lanlan
2011-01-01
Fault detection for wireless sensor networks (WSNs) has been studied intensively in recent years. Most existing works statically choose the manager nodes as probe stations and probe the network at a fixed frequency. This straightforward solution leads however to several deficiencies. Firstly, by only assigning the fault detection task to the manager node the whole network is out of balance, and this quickly overloads the already heavily burdened manager node, which in turn ultimately shortens the lifetime of the whole network. Secondly, probing with a fixed frequency often generates too much useless network traffic, which results in a waste of the limited network energy. Thirdly, the traditional algorithm for choosing a probing node is too complicated to be used in energy-critical wireless sensor networks. In this paper, we study the distribution characters of the fault nodes in wireless sensor networks, validate the Pareto principle that a small number of clusters contain most of the faults. We then present a Simple Random Sampling-based algorithm to dynamic choose sensor nodes as probe stations. A dynamic adjusting rule for probing frequency is also proposed to reduce the number of useless probing packets. The simulation experiments demonstrate that the algorithm and adjusting rule we present can effectively prolong the lifetime of a wireless sensor network without decreasing the fault detected rate. PMID:22163789
Huang, Rimao; Qiu, Xuesong; Rui, Lanlan
2011-01-01
Fault detection for wireless sensor networks (WSNs) has been studied intensively in recent years. Most existing works statically choose the manager nodes as probe stations and probe the network at a fixed frequency. This straightforward solution leads however to several deficiencies. Firstly, by only assigning the fault detection task to the manager node the whole network is out of balance, and this quickly overloads the already heavily burdened manager node, which in turn ultimately shortens the lifetime of the whole network. Secondly, probing with a fixed frequency often generates too much useless network traffic, which results in a waste of the limited network energy. Thirdly, the traditional algorithm for choosing a probing node is too complicated to be used in energy-critical wireless sensor networks. In this paper, we study the distribution characters of the fault nodes in wireless sensor networks, validate the Pareto principle that a small number of clusters contain most of the faults. We then present a Simple Random Sampling-based algorithm to dynamic choose sensor nodes as probe stations. A dynamic adjusting rule for probing frequency is also proposed to reduce the number of useless probing packets. The simulation experiments demonstrate that the algorithm and adjusting rule we present can effectively prolong the lifetime of a wireless sensor network without decreasing the fault detected rate.
Product Support Manager Guidebook
2011-04-01
package is being developed using supportability analysis concepts such as Failure Mode, Effects and Criticality Analysis (FMECA), Fault Tree Analysis ( FTA ...Analysis (LORA) Condition Based Maintenance + (CBM+) Fault Tree Analysis ( FTA ) Failure Mode, Effects, and Criticality Analysis (FMECA) Maintenance Task...Reporting and Corrective Action System (FRACAS), Fault Tree Analysis ( FTA ), Level of Repair Analysis (LORA), Maintenance Task Analysis (MTA
Walking...A Step in the Right Direction!
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Walking: A Step in the Right Direction Related ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Keeping Active and Healthy Eating for Men
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Keeping Active and Healthy Eating for Men Related ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Just Enough for You: About Food Portions
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Just Enough for You: About Food Portions Related ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Choosing a Safe and Successful Weight-Loss Program
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Choosing a Safe and Successful Weight-loss Program ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
77 FR 7136 - Caribbean Fishery Management Council; Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
.../Sedar_Workshops.jsp?WorkshopNum=26 ) 5. Discussion of options paper on parrotfish size and trip limits 6... meetings are open to the public, and will be conducted in English. Simultaneous interpretation (English...
Bassil, Alfred; Rubod, Chrystèle; Borghesi, Yves; Kerbage, Yohan; Schreiber, Elie Servan; Azaïs, Henri; Garabedian, Charles
2017-04-01
Hysteroscopy is one of the most common gynaecological procedure. Training for diagnostic and operative hysteroscopy can be achieved through numerous previously described models like animal models or virtual reality simulation. We present our novel combined model associating virtual reality and bovine uteruses and bladders. End year residents in obstetrics and gynaecology attended a full day workshop. The workshop was divided in theoretical courses from senior surgeons and hands-on training in operative hysteroscopy and virtual reality Essure ® procedures using the EssureSim™ and Pelvicsim™ simulators with multiple scenarios. Theoretical and operative knowledge was evaluated before and after the workshop and General Points Averages (GPAs) were calculated and compared using a Student's T test. GPAs were significantly higher after the workshop was completed. The biggest difference was observed in operative knowledge (0,28 GPA before workshop versus 0,55 after workshop, p<0,05). All of the 25 residents having completed the workshop applauded the realism an efficiency of this type of training. The force feedback allowed by the cattle uteruses gives the residents the possibility to manage thickness of resection as in real time surgery. Furthermore, the two-horned bovine uteruses allowed to reproduce septa resection in conditions close to human surgery CONCLUSION: Teaching operative and diagnostic hysteroscopy is essential. Managing this training through a full day workshop using a combined animal model and virtual reality simulation is an efficient model not described before. Copyright © 2017 Elsevier B.V. All rights reserved.
Bank, Ilana; Snell, Linda; Bhanji, Farhan
2014-12-01
Improved pediatric crisis resource management (CRM) training is needed in emergency medicine residencies because of the variable nature of exposure to critically ill pediatric patients during training. We created a short, needs-based pediatric CRM simulation workshop with postactivity follow-up to determine retention of CRM knowledge. Our aims were to provide a realistic learning experience for residents and to help the learners recognize common errors in teamwork and improve their perceived abilities to manage ill pediatric patients. Residents participated in a 4-hour objectives-based workshop derived from a formal needs assessment. To quantify their subjective abilities to manage pediatric cases, the residents completed a postworkshop survey (with a retrospective precomponent to assess perceived change). Ability to identify CRM errors was determined via a written assessment of scripted errors in a prerecorded video observed before and 1 month after completion of the workshop. Fifteen of the 16 eligible emergency medicine residents (postgraduate year 1-5) attended the workshop and completed the surveys. There were significant differences in 15 of 16 retrospective pre to post survey items using the Wilcoxon rank sum test for non-parametric data. These included ability to be an effective team leader in general (P < 0.008), delegating tasks appropriately (P < 0.009), and ability to ensure closed-loop communication (P < 0.008). There was a significant improvement in identification of CRM errors through the use of the video assessment from 3 of the 12 CRM errors to 7 of the 12 CRM errors (P < 0.006). The pediatric CRM simulation-based workshop improved the residents' self-perceptions of their pediatric CRM abilities and improved their performance on a video assessment task.
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Landscape ecology of plague in the American southwest, September 19-20, 2000, Fort Collins, Colorado
Brand, Christopher J.
2002-01-01
During September 19-20, 2000, a workshop titled "Landscape Ecology of Plague in the American Southwest" was held in Fort Collins, Colorado. The workshop was funded by the U.S. Geological Survey (USGS)-Earth Surface Processes Team and sponsored by the USGS National Wildlife Health Center. Forty scientists and natural resource managers and administrators representing 8 federal agencies, 4 state agencies, 6 universities, and other local agencies and nongovernment organizations met to discuss historical and current status of plague in the United States, current activities in plague surveillance, research, and management in wildlife, and research and information needs relative to plague control and management. Eleven individual presentations on plague history, status, and trends; diagnostic technologies; epizootiological studies and observations; and control and management strategies and studies, followed by a panel discussion on the impact of plague on wildlife and ecosystems, led the way to extensive group discussions on important plague-related questions, issues and problems. Workshop attendees participated in identifying important research and information needs relevant to control and management of plague in wildlife, and in the process, established new cooperative and collaborative partnerships and enhanced existing relationships upon which future research and information needs can be met. The proceedings from this workshop are intended to be used by the natural resource managers and researchers from the various participating agencies, research facilities, as well as other stakeholders to aid in the development of future research and information programs and funding initiatives related to both zoonotic and sylvatic plague.
Transfer of computer software technology through workshops: The case of fish bioenergetics modeling
Johnson, B.L.
1992-01-01
A three-part program is proposed to promote the availability and use of computer software packages to fishery managers and researchers. The approach consists of journal articles that announce new technologies, technical reports that serve as user's guides, and hands-on workshops that provide direct instruction to new users. Workshops, which allow experienced users to directly instruct novices in software operation and application are important, but often neglected. The author's experience with organizing and conducting bioenergetics modeling workshops suggests the optimal workshop would take 2 days, have 10-15 participants, one computer for every two users, and one instructor for every 5-6 people.
Havens: Explicit Reliable Memory Regions for HPC Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hukerikar, Saurabh; Engelmann, Christian
2016-01-01
Supporting error resilience in future exascale-class supercomputing systems is a critical challenge. Due to transistor scaling trends and increasing memory density, scientific simulations are expected to experience more interruptions caused by transient errors in the system memory. Existing hardware-based detection and recovery techniques will be inadequate to manage the presence of high memory fault rates. In this paper we propose a partial memory protection scheme based on region-based memory management. We define the concept of regions called havens that provide fault protection for program objects. We provide reliability for the regions through a software-based parity protection mechanism. Our approach enablesmore » critical program objects to be placed in these havens. The fault coverage provided by our approach is application agnostic, unlike algorithm-based fault tolerance techniques.« less
Patient-centered priorities for improving medication management and adherence.
McMullen, Carmit K; Safford, Monika M; Bosworth, Hayden B; Phansalkar, Shobha; Leong, Amye; Fagan, Maureen B; Trontell, Anne; Rumptz, Maureen; Vandermeer, Meredith L; Brinkman, William B; Burkholder, Rebecca; Frank, Lori; Hommel, Kevin; Mathews, Robin; Hornbrook, Mark C; Seid, Michael; Fordis, Michael; Lambert, Bruce; McElwee, Newell; Singh, Jasvinder A
2015-01-01
The Centers for Education and Research on Therapeutics convened a workshop to examine the scientific evidence on medication adherence interventions from the patient-centered perspective and to explore the potential of patient-centered medication management to improve chronic disease treatment. Patients, providers, researchers, and other stakeholders (N = 28) identified and prioritized ideas for future research and practice. We analyzed stakeholder voting on priorities and reviewed themes in workshop discussions. Ten priority areas emerged. Three areas were highly rated by all stakeholder groups: creating tools and systems to facilitate and evaluate patient-centered medication management plans; developing training on patient-centered prescribing for providers; and increasing patients' knowledge about medication management. However, priorities differed across stakeholder groups. Notably, patients prioritized using peer support to improve medication management while researchers did not. Engaging multiple stakeholders in setting a patient-centered research agenda and broadening the scope of adherence interventions to include other aspects of medication management resulted in priorities outside the traditional scope of adherence research. Workshop participants recognized the potential benefits of patient-centered medication management but also identified many challenges to implementation that require additional research and innovation. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
Proceedings of the third workshop on the energy development board of Mercer County, North Dakota
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Two earlier workshops concerned with managing growth in Mercer County, North Dakota focused on the activities of the Energy Development Board (EDB) and were held in 1977 and 1978, respectively. This third workshop, Energy Development in Rural Areas - Local Implementation of National Priorities addresses the transferability of the EDB as an organization approach for managing energy-related rapid growth; the potential for developing integrated energy resource conservation/economic plans in rural energy development areas; and Federal policy and initiatives regarding energy-impact assistance. Panel discussions on these subjects were conducted and the comments are presented. The introductory address by Wayne Sanstead, Lt.more » Gov. of North Dakota and the keynote address by Edward Helminski, White House Management Task Force on Energy Shortages, are included.« less
Mularski, Richard A; Reinke, Lynn F; Carrieri-Kohlman, Virginia; Fischer, Mark D; Campbell, Margaret L; Rocker, Graeme; Schneidman, Ann; Jacobs, Susan S; Arnold, Robert; Benditt, Joshua O; Booth, Sara; Byock, Ira; Chan, Garrett K; Curtis, J Randall; Donesky, Doranne; Hansen-Flaschen, John; Heffner, John; Klein, Russell; Limberg, Trina M; Manning, Harold L; Morrison, R Sean; Ries, Andrew L; Schmidt, Gregory A; Selecky, Paul A; Truog, Robert D; Wang, Angela C C; White, Douglas B
2013-10-01
In 2009, the American Thoracic Society (ATS) funded an assembly project, Palliative Management of Dyspnea Crisis, to focus on identification, management, and optimal resource utilization for effective palliation of acute episodes of dyspnea. We conducted a comprehensive search of the medical literature and evaluated available evidence from systematic evidence-based reviews (SEBRs) using a modified AMSTAR approach and then summarized the palliative management knowledge base for participants to use in discourse at a 2009 ATS workshop. We used an informal consensus process to develop a working definition of this novel entity and established an Ad Hoc Committee on Palliative Management of Dyspnea Crisis to further develop an official ATS document on the topic. The Ad Hoc Committee members defined dyspnea crisis as "sustained and severe resting breathing discomfort that occurs in patients with advanced, often life-limiting illness and overwhelms the patient and caregivers' ability to achieve symptom relief." Dyspnea crisis can occur suddenly and is characteristically without a reversible etiology. The workshop participants focused on dyspnea crisis management for patients in whom the goals of care are focused on palliation and for whom endotracheal intubation and mechanical ventilation are not consistent with articulated preferences. However, approaches to dyspnea crisis may also be appropriate for patients electing life-sustaining treatment. The Ad Hoc Committee developed a Workshop Report concerning assessment of dyspnea crisis; ethical and professional considerations; efficient utilization, communication, and care coordination; clinical management of dyspnea crisis; development of patient education and provider aid products; and enhancing implementation with audit and quality improvement.
Colman, John A.
2007-01-01
IntroductionAs part of the Department of the Interior (DOI) program Science on the DOI Landscape Initiative, the U.S. Geological Survey (USGS), Eastern Region, held a workshop during August 17–18, 2004, in Reston, VA, on mercury in the environment as it relates to DOI resource management. DOI bureaus manage millions of acres of land and offshore resources subject to mercury deposition and to the effects of mercury on ecosystems and human health. The goals of the workshop were to (1) summarize information on mercury sources and cycling on DOI lands in the eastern United States, (2) learn the perspectives of the DOI bureaus regarding mercury on DOI lands, (3) provide information to DOI land managers about monitoring mercury and minimizing mercury accumulation in wildlife and humans, and (4) consider future directions for mercury monitoring and research on DOI lands. The workshop focused on mercury research as it relates to DOI resource-management issues primarily in the eastern part of the United States (east of the Mississippi River). Topics included the influence of ecosystem setting on mercury biogeochemical transformation, land- and air-management practices as they affect mercury in the environment, mercury source issues, and effects of mercury on humans and wildlife. Mercury research topics were addressed by 24 invited oral presentations and 30 contributed posters. The perspectives of the DOI bureaus and land managers were addressed through a panel of scientists from the DOI resource-management bureaus and a Chippewa Indian Tribe of Minnesota. Discussion at the conclusion of the workshop was directed toward goals and long-term strategies for mercury research that will benefit DOI resource management. The panel, presentations, and discussions were videotaped and are available at the following URL, along with the slides presented: http://www.usgs.gov/mercury/2004workshop/ Abstracts from the presentations and posters are included in this report, together with summaries of each presentation session. The abstracts in this volume that were written by U.S. Geological Survey authors were reviewed and approved for publication by the Survey. Abstracts submitted by researchers from academia and from state and other federal agencies are published as part of these proceedings, but do not necessarily reflect the Survey’s policies and views. The use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government.
Proceedings of the Ocean Climate Data Workshop
NASA Technical Reports Server (NTRS)
Churgin, James (Compiler)
1992-01-01
The First Consultative Meeting on Responsible National Oceanographic Data Centres (RNODC's) and Climate DataServices met in February 1988 and made a number of recommendations related to improving services to meet the needs of climate programmes. Included in these discussions was a recommendation for a Workshop on Ocean Climate Data Management. This workshop will be talking about ways to establish a Global Ocean Observing System (GOOS).
ERIC Educational Resources Information Center
Morrison, James L.
The Beyond 2000 workshop held in February 1995 was designed to give participants experience in using strategic management techniques, such as critical trend and potential event identification, to examine the future of community colleges. This paper is intended as a guide for implementing similar workshops and summarizes the outcomes of workshop…
ERIC Educational Resources Information Center
Chin Roemer, Robin; Greer, Rebecca
2016-01-01
Research workshops are designed to help students develop skills that go beyond the scope of one-shot library sessions. However, with more students conducting research off-campus, online, and in the evening, workshops targeted towards complex skills and competencies are difficult to offer. But what if librarians were to design and deliver intensive…
Relationships between models used to analyze fire and fuel management alternatives
Nicholas L. Crookston; Werner A. Kurz; Sarah J. Beukema; Elizabeth D. Reinhardt
2000-01-01
Needs for analytical tools, the roles existing tools play, the processes they represent, and how they might interact are elements of key findings generated during a workshop held in Seattle February 17-18, 1999. The workshop was attended by 26 Joint Fire Science Program (JFSP) stakeholders and researchers. A focus of the workshop was the Fire and Fuels Extension to the...
Workshop: Economic Research and Policy Concerning Water Use and Watershed Management (1999)
Workshop proceedings: Integrating Economic and Physical Models in Water and Watershed Research, Methods for Measuring Stakeholder Values of Water Quality and Watershed Protection, and Applications of Stakeholder Valuation Techniques for Watersheds and WQ
Improving Your Health: Tips for African American Men and Women
... For Reporters Meetings & Workshops Follow Us Home Health Information Weight Management Health Tips for African-Americans Related Topics Section ... at NIDDK Technology Advancement & Transfer Meetings & Workshops Health Information ... Disease Urologic Diseases Endocrine Diseases Diet & Nutrition ...
Proceedings: workshop on fire, people, and the central hardwoods landscape
Daniel A. Yaussy; [comp.
2000-01-01
Contains 18 papers and 16 poster abstracts on the history of fire, fire ecology, fire and ecosystem management, and fire and the future presented at the workshop on fire, people, and the central hardwoods landscape.
A Unified Nonlinear Adaptive Approach for Detection and Isolation of Engine Faults
NASA Technical Reports Server (NTRS)
Tang, Liang; DeCastro, Jonathan A.; Zhang, Xiaodong; Farfan-Ramos, Luis; Simon, Donald L.
2010-01-01
A challenging problem in aircraft engine health management (EHM) system development is to detect and isolate faults in system components (i.e., compressor, turbine), actuators, and sensors. Existing nonlinear EHM methods often deal with component faults, actuator faults, and sensor faults separately, which may potentially lead to incorrect diagnostic decisions and unnecessary maintenance. Therefore, it would be ideal to address sensor faults, actuator faults, and component faults under one unified framework. This paper presents a systematic and unified nonlinear adaptive framework for detecting and isolating sensor faults, actuator faults, and component faults for aircraft engines. The fault detection and isolation (FDI) architecture consists of a parallel bank of nonlinear adaptive estimators. Adaptive thresholds are appropriately designed such that, in the presence of a particular fault, all components of the residual generated by the adaptive estimator corresponding to the actual fault type remain below their thresholds. If the faults are sufficiently different, then at least one component of the residual generated by each remaining adaptive estimator should exceed its threshold. Therefore, based on the specific response of the residuals, sensor faults, actuator faults, and component faults can be isolated. The effectiveness of the approach was evaluated using the NASA C-MAPSS turbofan engine model, and simulation results are presented.
Initial results from MARmara SuperSITE
NASA Astrophysics Data System (ADS)
Meral Ozel, Nurcan; Necmioglu, Ocal; Favali, Paolo; Douglas, John; Mathieu, Pierre-Philippe; Geli, Louis; Ergintav, Semih; Oguz Ozel, Asım; Tan, Onur; Gurbuz, Cemil; Erdik, Mustafa
2014-05-01
MARSite Project was initiated in November 2012 under the EC/FP-7 framework as an initiative towards establishment of new directions in seismic hazard assessment through focused earth observation in Marmara Region. Within MARSite, collection of the first comprehensive data set of fluids composition around the Sea of Marmara has been accomplished and first insight in the geochemical features of the fluids are expelled from tectonic structures around the Sea of Marmara. GPS time series and velocity fields are periodically updated and a project proposal has been prepared for Supersite initiative to take SAR data and integrate the results with in-situ data sets, which is accepted by the scientific committee of GEOSS. In the meantime, special focus was given to develop the processing algorithms, starting from low level atmospheric correction to high level modeling routines. Considerable progress has been made in the novel design of a multiparameter borehole system consisting of very wide dynamic range and stable borehole (VBB) broad band seismic sensor also incorporating 3-D strain meter, tilt meter, and temperature and local hydrostatic pressure measuring devices. Borehole and surface array locations and borehole bedrock depth of 137 m has been identified. A modeling scheme for the scenario earthquake simulation has been set up in order to realize processing of real-time high-rate GPS data and simulating of scenario earthquakes. The probability of occurrence for the fault segmentation in the Marmara region were calculated using the Poisson, BPT and BPT with a stress interaction models for time intervals of 5-10-30 and 50 years. High resolution seismic reflection and multibeam data in the easternmost Cinarcik basin obtained during the cruise MARMARA 2013 carried out onboard the CNR R/V Urania ship provided information on diffuse gravitational failures. An in situ multi-parameter observational system for landslide monitoring, including displacement, rainfall and seismic shaking measurements, has been prepared by INERIS to be set up on the field to be also set up as an early warning system prototype to be progressively parameterized and tested on near to real time condition. Slip rate on the Main Marmara Fault from 3D seismic data has been estimated and extremely young age of the North Anatolian Fault in the Sea of Marmara has been determined. Seismic risk study for IGDAS Natural Gas Network including pipelines and its components has been carried out with several earthquake scenarios in Marmara Sea. An automatic shut-off algorithm has been developed for the automatic shut-off of the gas flow at the IGDAS district regulators during an extreme event. All the European and international initiatives and projects that could have links with MARsite were identified as the initial step for the integration of data management practices and coordination with ongoing research infrastructures. EPOS and EMSO are considered to be crucial links that could provide sustainability of MARsite's developments beyond the project's lifetime. Concerning EMSO, Marmara is one of the nodes of the research infrastructure, in which a permanent installation at sea is being integrated with land-based networks. In the context of EPOS, MARsite will be a thematic core service. In addition, the data collection and dissemination in MARsite is carried out according to the data management principles of EMSO and EPOS. Dissemination activities reached a certain level of maturity through the relesea of Public Annual Report, quarterly newsletter, ID card and poster, social media interaction, dedicated web sites, videos and several conferences and workhops participated, such as GEO European Projects' Workshop, Supersites Coordination Workshop and GEO-X Plenary & Geneva Ministerial Summit .
NASA Technical Reports Server (NTRS)
1993-01-01
Two dozen participants assembled under the direction of the NASA Solar System Exploration Division (SEED) April 13-15, 1993. Participants supported the goals of cheaper and faster solar system exploration. The workshop concluded that the Discovery Program concept and goals are viable. Management concerns are articulated in the final report. Appendix A includes lists of participants in alphabetical order, by functional area, and by organization type. Appendix B includes the agenda for the meeting.
Theresa B. Jain; Russell T. Graham; Jonathan Sandquist
2010-01-01
Forests are important for carbon sequestration and how they are manipulated either through natural or human induced disturbances can have an effect on CO2 emissions and carbon sequestration. The 2009 National Silviculture Workshop presented scientific information and management strategies to meet a variety of objectives while simultaneously addressing carbon...
2009-05-01
Gernot Pomrenke, Mike Roukes, Omowunmi Sadik, Mike Sailor, Steve Semancik, Selim Shahriar, Ranganathan Shashidhar, Richard Silberglitt, Joseph Stetter...Federal Government. Additionally, the details of this report should prove useful for program managers and laboratory administrators, as well as for...active researchers involved with managing sensors-related and nanotechnology programs. On behalf of the NSET Subcommittee, we thank the workshop co
NASA Technical Reports Server (NTRS)
Yates, Amy M.; Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Gonzalez, Oscar R.; Gray, W. Steven
2010-01-01
Safety-critical distributed flight control systems require robustness in the presence of faults. In general, these systems consist of a number of input/output (I/O) and computation nodes interacting through a fault-tolerant data communication system. The communication system transfers sensor data and control commands and can handle most faults under typical operating conditions. However, the performance of the closed-loop system can be adversely affected as a result of operating in harsh environments. In particular, High-Intensity Radiated Field (HIRF) environments have the potential to cause random fault manifestations in individual avionic components and to generate simultaneous system-wide communication faults that overwhelm existing fault management mechanisms. This paper presents the design of an experiment conducted at the NASA Langley Research Center's HIRF Laboratory to statistically characterize the faults that a HIRF environment can trigger on a single node of a distributed flight control system.
First Aviation System Technology Advanced Research (AvSTAR) Workshop
NASA Technical Reports Server (NTRS)
Denery, Dallas G. (Editor); Weathers, Del W. (Editor); Rosen, Robert (Technical Monitor); Edwards, Tom (Technical Monitor)
2001-01-01
This Conference Proceedings documents the results of a two-day NASA/FAA/Industry workshop that was held at the NASA Ames Research Center, located at Moffett Field, CA, on September 21-22, 2000. The purpose of the workshop was to bring together a representative cross section of leaders in air traffic management, from industry. FAA, and academia, to assist in defining the requirements for a new research effort, referred to as AvSTAR Aviation Systems Technology Advanced Research). The Conference Proceedings includes the individual presentation, and summarizes the workshop discussions and recommendations.
Application of a Multimedia Service and Resource Management Architecture for Fault Diagnosis
Castro, Alfonso; Sedano, Andrés A.; García, Fco. Javier; Villoslada, Eduardo
2017-01-01
Nowadays, the complexity of global video products has substantially increased. They are composed of several associated services whose functionalities need to adapt across heterogeneous networks with different technologies and administrative domains. Each of these domains has different operational procedures; therefore, the comprehensive management of multi-domain services presents serious challenges. This paper discusses an approach to service management linking fault diagnosis system and Business Processes for Telefónica’s global video service. The main contribution of this paper is the proposal of an extended service management architecture based on Multi Agent Systems able to integrate the fault diagnosis with other different service management functionalities. This architecture includes a distributed set of agents able to coordinate their actions under the umbrella of a Shared Knowledge Plane, inferring and sharing their knowledge with semantic techniques and three types of automatic reasoning: heterogeneous, ontology-based and Bayesian reasoning. This proposal has been deployed and validated in a real scenario in the video service offered by Telefónica Latam. PMID:29283398
Application of a Multimedia Service and Resource Management Architecture for Fault Diagnosis.
Castro, Alfonso; Sedano, Andrés A; García, Fco Javier; Villoslada, Eduardo; Villagrá, Víctor A
2017-12-28
Nowadays, the complexity of global video products has substantially increased. They are composed of several associated services whose functionalities need to adapt across heterogeneous networks with different technologies and administrative domains. Each of these domains has different operational procedures; therefore, the comprehensive management of multi-domain services presents serious challenges. This paper discusses an approach to service management linking fault diagnosis system and Business Processes for Telefónica's global video service. The main contribution of this paper is the proposal of an extended service management architecture based on Multi Agent Systems able to integrate the fault diagnosis with other different service management functionalities. This architecture includes a distributed set of agents able to coordinate their actions under the umbrella of a Shared Knowledge Plane, inferring and sharing their knowledge with semantic techniques and three types of automatic reasoning: heterogeneous, ontology-based and Bayesian reasoning. This proposal has been deployed and validated in a real scenario in the video service offered by Telefónica Latam.
Seattle - seeking balance between the Space Needle, Starbucks, the Seahawks, and subduction
NASA Astrophysics Data System (ADS)
Vidale, J. E.
2012-12-01
Seattle has rich natural hazards. Lahars from Mount Rainier flow from the south, volcanic ash drifts from the East, the South Whidbey Island fault lies north and east, the Cascadia subduction zone dives underfoot from the west, and the Seattle fault lies just below the surface. Past and future landslides are sprinkled democratically across the surface, and Lake Washington and Puget Sound are known to seiche. All are ultimately due to subduction tectonics. As in most tectonically-exposed cities, the hazards are due mainly (1) to the buildings predating the relatively recent revelation that faulting here is active, (2) transportation corridors built long ago that are aging without a good budget for renewal, and (3) the unknown unknowns. These hazards are hard to quantify. Only the largest earthquakes on the Cascadia megathrust have a 10,000-year history, and even for them the down-dip rupture limits, stress drop and attenuation have unacceptable uncertainty. For the threatening faults closer in the upper crust, written history is short, glacial erosion and blanketing preclude many geophysical investigations, and healthy forests frustrate InSAR. On the brighter side, the direct hazard of earthquake shaking is being addressed as well as it can be. The current seismic hazard estimate is derived by methods among the most sophisticated in the world. Logic trees informed by consensus forged from a series of workshops delineate the scenarios. Finite difference calculations that include the world-class deep and soggy basins project the shaking from fault to vulnerable city. One useful cartoon synthesizing the earthquake hazard, based on Art Frankel's report, is shown below. It illustrates that important areas will be strongly shaken, and issues remain to be addressed. Fortunately, with great coffee and good perspective, we are moving toward improved disaster preparedness and resilience.
Eco-informatics and natural resource management
Cushing, J.B.; Wilson, T.; Borning, A.; Delcambre, L.; Bowker, G.; Frame, M.; Schnase, J.; Sonntag, W.; Fulop, J.; Hert, C.; Hovy, E.; Jones, J.; Landis, E.; Schweik, C.; Brandt, L.; Gregg, V.; Spengler, S.
2006-01-01
This project highlight reports on the 2004 workshop [1], as well as follow-up activities in 2005 and 2006, regarding how informatics tools can help manage natural resources and decide policy. The workshop was sponsored jointly by sponsored by the NSF, NBII, NASA, and EPA, and attended by practitioners from government and non-government agencies, and university researchers from the computer, social, and ecological sciences. The workshop presented the significant information technology (IT) problems that resource managers face when integrating ecological or environmental information to make decisions. These IT problems fall into five categories: data presentation, data gaps, tools, indicators, and policy making and implementation. To alleviate such problems, we recommend informatics research in four IT areas, as defined in this abstract and our final report: modeling and simulation, data quality, information integration and ontologies, and social and human aspects. Additionally, we recommend that funding agencies provide infrastructure and some changes in funding habits to assure cycles of innovation in the domain were addressed. Follow-on activities to the workshop subsequent to dg.o 2005 included: an invited talk presenting workshop results at DILS 2005, publication of the workshop final report by the NBII [1], and a poster at the NBII All Hands Meeting (Oct. 2005). We also expect a special issue of the JIIS to appear in 2006 that addresses some of these questions. As we go to press, no solicitation by funding agencies has as yet been published, but various NASA and NBII, and NSF cyber-infrastructure and DG research efforts now underway address the above issues.
Dealing with largemouth bass virus: benefits of multisector collaboration
Terre, David R.; Schramm, Harold; Grizzle , John M.; Fries, Loraine T.
2015-01-01
Largemouth bass virus (LMBV), a recently identified pathogen, affected largemouth bass (Micropterus salmoides) in the southeastern United States beginning in the 1990s. Concern about the impacts of this little-known pathogen on largemouth bass populations, effects on fisheries management, and the need to provide anglers and the media with consistent and accurate information prompted a private organization (Bass Anglers Sportsman Society) to invite managers and researchers from state and federal agencies and universities to a series of five annual public workshops beginning in 2000. These workshops provided a mechanism to share information, identify and prioritize action items, and develop consensus information and outreach materials that could be provided to bass anglers and the media. Regionalizing the LMBV issue and collaboration among researchers, managers, and a fishing organization may also have allayed angler and media concerns. The process embodied in these workshops is offered as a successful example of multi-agency, multi-sector collaboration to facilitate information acquisition and guide action to address a regional fisheries management issue.
Atmospheric nitrogen compounds II: emissions, transport, transformation, deposition and assessment
NASA Astrophysics Data System (ADS)
Aneja, Viney P.; Roelle, Paul A.; Murray, George C.; Southerland, James; Erisman, Jan Willem; Fowler, David; Asman, Willem A. H.; Patni, Naveen
The Atmospheric Nitrogen Compounds II: Emissions, Transport, Transformation, Deposition and Assessment workshop was held in Chapel Hill, NC from 7 to 9 June 1999. This international conference, which served as a follow-up to the workshop held in March 1997, was sponsored by: North Carolina Department of Environment and Natural Resources; North Carolina Department of Health and Human Services, North Carolina Office of the State Health Director; Mid-Atlantic Regional Air Management Association; North Carolina Water Resources Research Institute; Air and Waste Management Association, RTP Chapter; the US Environmental Protection Agency and the North Carolina State University (College of Physical and Mathematical Sciences, and North Carolina Agricultural Research Service). The workshop was structured as an open forum at which scientists, policy makers, industry representatives and others could freely share current knowledge and ideas, and included international perspectives. The workshop commenced with international perspectives from the United States, Canada, United Kingdom, the Netherlands, and Denmark. This article summarizes the findings of the workshop and articulates future research needs and ways to address nitrogen/ammonia from intensively managed animal agriculture. The need for developing sustainable solutions for managing the animal waste problem is vital for shaping the future of North Carolina. As part of that process, all aspects of environmental issues (air, water, soil) must be addressed as part of a comprehensive and long-term strategy. There is an urgent need for North Carolina policy makers to create a new, independent organization that will build consensus and mobilize resources to find technologically and economically feasible solutions to this aspect of the animal waste problem.
Wyoming Landscape Conservation Initiative Science Workshop Proceedings, May 15-17, 2007
D'Erchia, Frank
2008-01-01
The U.S. Geological Survey (USGS) hosted a Wyoming Landscape Conservation Initiative (WLCI) Science Workshop at the University of Wyoming on May 15, 16, and 17, 2007. The goal of the workshop was to gather information from stakeholders about research needs and existing data resources to help develop the USGS WLCI science plan. The workshop focused on six research and management needs identified by WLCI partners prior to the workshop: *evaluate the cumulative effects of development activities; *identify key drivers of change; *identify condition and distribution of key wildlife species, habitat, and species habitat requirements; *evaluate wildlife and livestock responses to development; *develop an integrated inventory and monitoring strategy; and *develop a data clearinghouse and an information-management framework. These topics correlated to six plenary panels and discussions and six breakout sessions. Several collective needs were identified: *create a long-term, accessible information database; *identify key habitats, indicator species; *collect and research missing critical baseline data; *begin on-the-ground projects as soon as possible; and *implement a monitoring program to assist with adaptive management techniques. Several concerns were expressed repeatedly: *secure adequate and long-term funding; *meeting the WLCI workload with agencies that are already understaffed; *assess cumulative effects as an analysis approach; *perform offsite mitigation in a way that is valuable and effective; *focus all research on providing practical applications; and *involve the public in WLCI proceedings.
Modeling, Detection, and Disambiguation of Sensor Faults for Aerospace Applications
NASA Technical Reports Server (NTRS)
Balaban, Edward; Saxena, Abhinav; Bansal, Prasun; Goebel, Kai F.; Curran, Simon
2009-01-01
Sensor faults continue to be a major hurdle for systems health management to reach its full potential. At the same time, few recorded instances of sensor faults exist. It is equally difficult to seed particular sensor faults. Therefore, research is underway to better understand the different fault modes seen in sensors and to model the faults. The fault models can then be used in simulated sensor fault scenarios to ensure that algorithms can distinguish between sensor faults and system faults. The paper illustrates the work with data collected from an electro-mechanical actuator in an aerospace setting, equipped with temperature, vibration, current, and position sensors. The most common sensor faults, such as bias, drift, scaling, and dropout were simulated and injected into the experimental data, with the goal of making these simulations as realistic as feasible. A neural network based classifier was then created and tested on both experimental data and the more challenging randomized data sequences. Additional studies were also conducted to determine sensitivity of detection and disambiguation efficacy to severity of fault conditions.
Solar Photovoltaic (PV) Distributed Generation Systems - Control and Protection
NASA Astrophysics Data System (ADS)
Yi, Zhehan
This dissertation proposes a comprehensive control, power management, and fault detection strategy for solar photovoltaic (PV) distribution generations. Battery storages are typically employed in PV systems to mitigate the power fluctuation caused by unstable solar irradiance. With AC and DC loads, a PV-battery system can be treated as a hybrid microgrid which contains both DC and AC power resources and buses. In this thesis, a control power and management system (CAPMS) for PV-battery hybrid microgrid is proposed, which provides 1) the DC and AC bus voltage and AC frequency regulating scheme and controllers designed to track set points; 2) a power flow management strategy in the hybrid microgrid to achieve system generation and demand balance in both grid-connected and islanded modes; 3) smooth transition control during grid reconnection by frequency and phase synchronization control between the main grid and microgrid. Due to the increasing demands for PV power, scales of PV systems are getting larger and fault detection in PV arrays becomes challenging. High-impedance faults, low-mismatch faults, and faults occurred in low irradiance conditions tend to be hidden due to low fault currents, particularly, when a PV maximum power point tracking (MPPT) algorithm is in-service. If remain undetected, these faults can considerably lower the output energy of solar systems, damage the panels, and potentially cause fire hazards. In this dissertation, fault detection challenges in PV arrays are analyzed in depth, considering the crossing relations among the characteristics of PV, interactions with MPPT algorithms, and the nature of solar irradiance. Two fault detection schemes are then designed as attempts to address these technical issues, which detect faults inside PV arrays accurately even under challenging circumstances, e.g., faults in low irradiance conditions or high-impedance faults. Taking advantage of multi-resolution signal decomposition (MSD), a powerful signal processing technique based on discrete wavelet transformation (DWT), the first attempt is devised, which extracts the features of both line-to-line (L-L) and line-to-ground (L-G) faults and employs a fuzzy inference system (FIS) for the decision-making stage of fault detection. This scheme is then improved as the second attempt by further studying the system's behaviors during L-L faults, extracting more efficient fault features, and devising a more advanced decision-making stage: the two-stage support vector machine (SVM). For the first time, the two-stage SVM method is proposed in this dissertation to detect L-L faults in PV system with satisfactory accuracies. Numerous simulation and experimental case studies are carried out to verify the proposed control and protection strategies. Simulation environment is set up using the PSCAD/EMTDC and Matlab/Simulink software packages. Experimental case studies are conducted in a PV-battery hybrid microgrid using the dSPACE real-time controller to demonstrate the ease of hardware implementation and the controller performance. Another small-scale grid-connected PV system is set up to verify both fault detection algorithms which demonstrate promising performances and fault detecting accuracies.
USGS-NPS Servicewide Benthic Mapping Program (SBMP) workshop report
Moses, Christopher S.; Nayagandhi, Amar; Brock, John; Beavers, Rebecca
2010-01-01
The National Park Service (NPS) Inventory and Monitoring (I&M) Program recently allocated funds to initiate a benthic mapping program in ocean and Great Lakes parks in alignment with the NPS Ocean Park Stewardship 2007-2008 Action Plan. Seventy-four (ocean and Great Lakes) parks, spanning more than 5,000 miles of coastline, many affected by increasing coastal storms and other natural and anthropogenic processes, make the development of a Servicewide Benthic Mapping Program (SBMP) timely. The resulting maps and associated reports will be provided to NPS managers in a consistent servicewide format to help park managers protect and manage the 3 million acres of submerged National Park System natural and cultural resources. Of the 74 ocean and Great Lakes park units, the 40 parks with submerged acreage will be the focus in the early years of the SBMP. The NPS and U.S. Geological Survey (USGS) convened a workshop (June 3-5, 2008) in Lakewood, CO. The assembly of experts from the NPS and other Federal and non-Federal agencies clarified the needs and goals of the NPS SBMP and was one of the key first steps in designing the benthic mapping program. The central needs for individual parks, park networks, and regions identified by workshop participants were maps including bathymetry, bottom type, geology, and biology. This workshop, although not an exhaustive survey of data-acquisition technologies, highlighted the more promising technologies being used, existing sources of data, and the need for partnerships to leverage resources. Workshop products include recommended classification schemes and management approaches for consistent application and products similar to other long-term NPS benthic mapping efforts. As part of the SBMP, recommendations from this workshop, including application of an improved version of the Coastal and Marine Ecological Classification Standard (CMECS), will be tested in several pilot parks. In 2008, in conjunction with the findings of this workshop, the NPS funded benthic mapping projects in Glacier Bay National Park and Preserve, Golden Gate National Recreational Area, Sleeping Bear Dunes National Lakeshore, Gulf Islands National Seashore, Virgin Islands National Park, and Virgin Islands Coral Reef National Monument.
Simulation research on the process of large scale ship plane segmentation intelligent workshop
NASA Astrophysics Data System (ADS)
Xu, Peng; Liao, Liangchuang; Zhou, Chao; Xue, Rui; Fu, Wei
2017-04-01
Large scale ship plane segmentation intelligent workshop is a new thing, and there is no research work in related fields at home and abroad. The mode of production should be transformed by the existing industry 2.0 or part of industry 3.0, also transformed from "human brain analysis and judgment + machine manufacturing" to "machine analysis and judgment + machine manufacturing". In this transforming process, there are a great deal of tasks need to be determined on the aspects of management and technology, such as workshop structure evolution, development of intelligent equipment and changes in business model. Along with them is the reformation of the whole workshop. Process simulation in this project would verify general layout and process flow of large scale ship plane section intelligent workshop, also would analyze intelligent workshop working efficiency, which is significant to the next step of the transformation of plane segmentation intelligent workshop.
Sharon Parker; Susan Stevens Hummel
2002-01-01
The 2001 National Silviculture Workshop was held in Hood River, Oregon, and hosted by the Mt. Hood National Forest, the Gifford Pinchot National Forest, and the Pacific Northwest Research Station. The Washington Office Vegetation Management and Protection Research and Forest and Grassland staffs are ongoing sponsors of the biennial workshop, which began in 1973 in...
Competitiveness Improvement Project Informational Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sinclair, Karin C; Preus, Robert W; Dana, Scott
This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.
Ruth, Janet M.; Manville, Albert; Larkin, Ron; Barrow, Wylie C.; Johnson-Randall, Lori; Dawson, Deanna K.; Diehl, Robert H.; Wang, Yufang; Sojda, Richard S.; Angryk, Rafal; Klaver, Robert W.; Mead, Reggie; Paxton, John; Heglund, Patricia J.; Kirsch, Eileen; Suarez, Manuel J.; Robinson, Larry; Gauthreaux, Sidney A.; Belser, Carroll G.; Franke, Steven J.; Bruderer, Bruno; Buler, Jeffrey J.; Moore, Frank R.; Mizrahi, David S.; Fogg, Robert; Kelly, T. Adam; Cryan, Paul; Crum, Tim; Schuur, Terry J.; Krueper, Dave; Diehl, Robb; Will, Tom; Ruth, Janet M.
2007-01-01
There was considerable interest in expanding the “radar collaborative” to include those agencies, organizations, and industries represented at the workshop. It was felt that the publication of the workshop proceedings, implementation of action items, and additional future meetings or workshops will be crucial in strengthening the “radar collaborative” effort and promoting the use of these valuable technologies for conserving migratory species.
Rossomando, Edward F; Benitez, Hubert; Janicki, Bernard W
2004-09-01
In July 1999, the National Institute of Dental and Craniofacial Research (NIDCR) convened a Blue Ribbon Panel that recommended management skills, entrepreneurship, and technology transfer should be included in dental education. The panel's recommendations were implemented in an NIDCR-funded pilot project, "Workshop Course to Promote and Develop Dental Products and Technologies." The workshop consisted of lectures presented by seven faculty members recruited from academia, government, and business, along with an analysis of a professor's invention and the barriers encountered in transforming the invention into a product. Evaluation consisted of a pre- and post-workshop survey. The workshop was presented to twenty-two participants on November 8 and 9, 2003 at the University of Connecticut School of Dental Medicine and, to refine the presentation further, will be tested at five additional dental schools (University of Pennsylvania, Harvard University, New York University, Nova Southeastern University, and University of Southern California). The results indicated that the workshop's courses would be helpful to the commercialization of inventions. In addition, dental students with experience in basic research expressed an interest in research of projects of use in dental practice. These findings suggest that pursuing research and an academic career might be more appealing if their research was product-oriented.
Informal Geoscience Education partnerships via the EarthScope Program
NASA Astrophysics Data System (ADS)
Lillie, R. J.; Trehu, A. M.; Goddard, C.; Braunmiller, J.
2008-05-01
EarthScope is a National Science Foundation (NSF)-supported program to explore the structure and evolution of the North American continent and understand the processes controlling earthquakes and volcanic eruptions. It consists of three observatories, funded through NSF's Major Research Equipment and Facilities Construction program. 1) The Plate Boundary Observatory (PBO) consists of GPS and other geodetic instruments to measure deformation of the active plate boundary that characterizes the western United States. 2) The San Andreas Fault Observatory at Depth (SAFOD) is a hole drilled to sample and instrument an active strand of an earthquake fault. 3) USArray is a network of seismometers and other geophysical instruments to record earthquakes and image the velocity and electrical conductivity structure from the Pacific to the Atlantic oceans. This nationwide recording effort and large-scale scientific objective provides a unique opportunity to partner with the U. S. National Park Service and other state, federal and private organizations that inform the public about the natural world. In particular, the EarthScope National Office (ESNO) is developing thematic displays to link multiple parks through their common geodynamic origin. These displays are being tested and refined through a series of workshops during which park and museum personnel, K-12 teachers, and active research scientists work together to develop programs to introduce the public to the forces that shape our continent. The first of these workshops, held in April, 2008, at the Mount Rainier National Park Education Center in Washington State, focused on earthquake, volcanic, and other tectonic processes that form the dynamic landscape of the Pacific Northwest.
Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S
2016-09-01
The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.
A New Platform for Managing Soil Carbon and Soil Health
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loisel, Julie; Malhotra, Avni; Phillips, Claire
International Soil Carbon Network Workshop; Stanford, California, 27 February to 3 March 2017. Here, workshop participants recognized the need to identify vulnerabilities and opportunities for linking SOM-C science and the societal mandate to manage soils and ecosystems for productivity and carbon sequestration in future decades. Lastly, we outlined a path to gain support for the ISCN vision of a collective soil data platform from stakeholders and partners through engagement in coming years.
A New Platform for Managing Soil Carbon and Soil Health
Loisel, Julie; Malhotra, Avni; Phillips, Claire
2017-08-25
International Soil Carbon Network Workshop; Stanford, California, 27 February to 3 March 2017. Here, workshop participants recognized the need to identify vulnerabilities and opportunities for linking SOM-C science and the societal mandate to manage soils and ecosystems for productivity and carbon sequestration in future decades. Lastly, we outlined a path to gain support for the ISCN vision of a collective soil data platform from stakeholders and partners through engagement in coming years.
Warren T. Doolittle; A. P. Mustain; Carter B. Gibbs; David. A. Marquis; Barton M. Blum; Carl H. Tubbs; W. B. Leak; S. F. Gingrich; H. Clay Smith; Paul S. DeBald; LaMont G. Engle; Robert E. Phares
1975-01-01
The workshop, summarized in this Proceedings, represented a joint effort by personnel from Research, National Forest System, and State and Private Forestry, to review the state-of-the-art knowledge about the applicability of uneven-aged silviculture and management in the eastern United States. One major objective of this review was to develop a much better mutual...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-04-27
Twenty-seven Native American tribal members, council members, and other interested parties gathered in Santa Fe, New Mexico, to attend the Native American Workshop on Petroleum Energy on August 11 and 12, 1997, sponsored by the U.S. Department of Energy and presented by BDM-Oklahoma, Inc, staff. Tribes represented at the workshop included the Jicarilla Apache, Pueblo of Acoma and Ute. Representatives of the Environmental Protection Agency (USEPA), Bureau of Indian Affairs (BIA), Bureau of Land Management (BLM), and Minerals Management Service (MMS) also attended. BDM-Oklahoma developed and organized the Native American Workshop on Petroleum Energy to help meet the goals ofmore » the U.S. Department of Energy's Domestic Gas and Oil Initiative to help Native American tribes become more self-sufficient in developing and managing petroleum resources.« less
Flood Hazard Management: British and International Perspectives
NASA Astrophysics Data System (ADS)
James, L. Douglas
This proceedings of an international workshop at the Flood Hazard Research Centre (Queensway, Enfield, Middlesex, U.K.) begins by noting how past British research on flood problems concentrated on refining techniques to implement established policy. In contrast, research covered in North American and Australian publications involved normative issues on policy alternatives and administrative implementation. The workshop's participants included 16 widely recognized scientists, whose origins were about equally divided between Britain and overseas; from this group the workshop's organizers expertly drew ideas for refining British urban riverine flood hazard management and for cultivating links among researchers everywhere. Such intellectual exchange should be of keen interest to flood hazard program managers around the world, to students of comparative institutional performance, to those who make policy on protecting people from hazards, and to hydrologists and other geophysicists who must communicate descriptive information for bureaucratic, political, and public decision- making.
MSFC Skylab Orbital Workshop, volume 5
NASA Technical Reports Server (NTRS)
1974-01-01
The various programs involved in the development of the Skylab Orbital Workshop are discussed. The subjects considered include the following: (1) reliability program, (2) system safety program, (3) testing program, (4) engineering program management, (5) mission operations support, and (6) aerospace applications.
Implementation and Performance of Low Impact Development
This workshop will provide participants with a basic understanding of LID approaches and techniques and how these techniques help achieve stormwater management goals and protect water quality and stream health. The workshop will cover impacts of land development on hydrology and...
Community pharmacists' knowledge of diabetes management during Ramadan in Egypt.
Amin, Mohamed E K; Chewning, Betty
2014-12-01
Although Muslim diabetic patients may be aware of their religious exemption from fasting, many still fast and adjust their medication regimens accordingly. Pharmacists have a significant potential to identify and prevent harm from medication misuse in Ramadan. This study examines Egyptian pharmacists' knowledge regarding management of diabetes during Ramadan. It also explores pharmacists' willingness to attend a 1 day workshop on medication regimen adjustment during Ramadan. Community pharmacies throughout Alexandria, Egypt. A cross-sectional study using a pretested self-administered survey was conducted among a random sample of community pharmacists. The survey included three knowledge questions relevant to counseling diabetic patients during Ramadan. Questions covered the recommended timing and dosing for metformin and insulin as well as the safe blood glucose range required for diabetic patients to safely continue their fast. Using logistic regression, a model was estimated to predict pharmacists' willingness to attend a workshop on the adjustment of medication regimens during Ramadan. Content analysis was used to analyze pharmacists' answers to the question concerning what they would like the workshop to cover. Pharmacists' aggregate scores for all three diabetes management knowledge questions and pharmacists' willingness to attend a workshop on the adjustment of medication regimens during Ramadan. Ninety three percent of the 298 approached pharmacists agreed to participate. Forty three pharmacists (15.9%) did not know the correct answer to any question, 118(43.7%) 24 answered one correctly, 86 (31.9%) answered two correctly and only 23 (8.5%) answered all 25 three correctly. Confidence in therapeutic knowledge regarding medication regimen 26 adjustment during Ramadan was not associated with the pharmacists' knowledge of diabetes management during Ramadan. One hundred seventy five (63.6%) pharmacists wanted to attend a workshop on adjusting medication regimens during Ramadan. This was significantly associated with pharmacists being Muslim (OR 3.52, CI 1.70-7.27) and of younger age (OR 30 = 0.98, CI 0.96-0.99978). Pharmacists offered specific content and communication process 31 suggestions for the workshop content. This study identifies variability among community pharmacists' knowledge of diabetes management during Ramadan. It also shows willingness among the majority of pharmacists to learn more about the topic.
SLURM: Simple Linux Utility for Resource Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jette, M; Dunlap, C; Garlick, J
2002-04-24
Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, and scheduling modules. The design also includes a scalable, general-purpose communication infrastructure. Development will take place in four phases: Phase I results in a solid infrastructure; Phase II produces a functional but limited interactive job initiation capability without use of the interconnect/switch; Phase III provides switch support and documentation; Phase IV provides job status, fault-tolerance, and job queuing and control through Livermore's Distributed Productionmore » Control System (DPCS), a meta-batch and resource management system.« less
NASA Astrophysics Data System (ADS)
Magee, Jeff; Moffett, Jonathan
1996-06-01
Special Issue on Management This special issue contains seven papers originally presented at an International Workshop on Services for Managing Distributed Systems (SMDS'95), held in September 1995 in Karslruhe, Germany. The workshop was organized to present the results of two ESPRIT III funded projects, Sysman and IDSM, and more generally to bring together work in the area of distributed systems management. The workshop focused on the tools and techniques necessary for managing future large-scale, multi-organizational distributed systems. The open call for papers attracted a large number of submissions and the subsequent attendance at the workshop, which was larger than expected, clearly indicated that the topics addressed by the workshop were of considerable interest both to industry and academia. The papers selected for this special issue represent an excellent coverage of the issues addressed by the workshop. A particular focus of the workshop was the need to help managers deal with the size and complexity of modern distributed systems by the provision of automated support. This automation must have two prime characteristics: it must provide a flexible management system which responds rapidly to changing organizational needs, and it must provide both human managers and automated management components with the information that they need, in a form which can be used for decision-making. These two characteristics define the two main themes of this special issue. To satisfy the requirement for a flexible management system, workers in both industry and universities have turned to architectures which support policy directed management. In these architectures policy is explicitly represented and can be readily modified to meet changing requirements. The paper `Towards implementing policy-based systems management' by Meyer, Anstötz and Popien describes an approach whereby policy is enforced by event-triggered rules. Krause and Zimmermann in their paper `Implementing configuration management policies for distributed applications' present a system in which the configuration of the system in terms of its constituent components and their interconnections can be controlled by reconfiguration rules. Neumair and Wies in the paper `Case study: applying management policies to manage distributed queuing systems' examine how high-level policies can be transformed into practical and efficient implementations for the case of distributed job queuing systems. Koch and Krämer in `Rules and agents for automated management of distributed systems' describe the results of an experiment in using the software development environment Marvel to provide a rule based implementation of management policy. The paper by Jardin, `Supporting scalability and flexibility in a distributed management platform' reports on the experience of using a policy directed approach in the industrial strength TeMIP management platform. Both human managers and automated management components rely on a comprehensive monitoring system to provide accurate and timely information on which decisions are made to modify the operation of a system. The monitoring service must deal with condensing and summarizing the vast amount of data available to produce the events of interest to the controlling components of the overall management system. The paper `Distributed intelligent monitoring and reporting facilities' by Pavlou, Mykoniatis and Sanchez describes a flexible monitoring system in which the monitoring agents themselves are policy directed. Their monitoring system has been implemented in the context of the OSIMIS management platform. Debski and Janas in `The SysMan monitoring service and its management environment' describe the overall SysMan management system architecture and then concentrate on how event processing and distribution is supported in that architecture. The collection of papers gives a good overview of the current state of the art in distributed system management. It has reached a point at which a first generation of systems, based on policy representation within systems and automated monitoring systems, are coming into practical use. The papers also serve to identify many of the issues which are open research questions. In particular, as management systems increase in complexity, how far can we automate the refinement of high-level policies into implementations? How can we detect and resolve conflicts between policies? And how can monitoring services deal efficiently with ever-growing complexity and volume? We wish to acknowledge the many contributors, besides the authors, who have made this issue possible: the anonymous reviewers who have done much to assure the quality of these papers, Morris Sloman and his Programme Committee who convened the Workshop, and Thomas Usländer and his team at the Fraunhofer Institute in Karlsruhe who acted as hosts.
Improving collaborative care in managing eating disorders: a pilot study.
Heath, Olga; English, Denise; Simms, Joanne; Ward, Pamela; Hollett, Ann; Dominic, Anna
2013-01-01
The purpose of this pilot study was to evaluate the impact of a continuing interprofessional educational workshop focused on eating disorders in a rural area in Newfoundland and Labrador (NL), Canada. The pilot study helped determine if the eating disorder workshop was feasible for implementation to a broader audience. A conceptual model developed by our eating disorder team and described in the article guided this innovative program. The intensive 2-day workshop was piloted in one community with 41 health and education professionals in attendance. A key element was the focus on creating and sustaining collaborative care for eating disorders. Participants completed pre-post workshop measures of interprofessional attitudes and skills, self-reported knowledge, confidence, and intention to change practice (post questionnaire only). A 6-month follow-up survey measured self-reported practice change. There were significant positive changes in interprofessional attitudes and skills as well as knowledge and confidence in collaborative management of eating disorders. Post-workshop, 69% (n = 24/35) of participants indicated intention to change practice, and on follow-up, 7 of 10 respondents reported implementing changes in practice as a result of the workshop. Low response rate at follow-up was a limitation. Results support the impact of the workshop in improving knowledge, confidence, and attitudes toward collaboration and changing practice and the value of implementing the program province-wide. Copyright © 2013 The Alliance for Continuing Education in the Health Professions, the Society for Academic Continuing Medical Education, and the Council on CME, Association for Hospital Medical Education.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pratt, Richard J.
2013-11-01
From 17-21 June 2013, Sandia National Laboratories, Technical Area-V (SNL TA-V) represented the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) at the International Atomic Energy Agency (IAEA) Training Workshop (T3-TR-45486). This report gives a breakdown of the IAEA regulatory structure for those unfamiliar, and the lessons learned and observations that apply to SNL TA-V that were obtained from the workshop. The Safety Report Series, IAEA workshop final report, and SNL TA-V presentation are included as attachments.
2011-12-01
Task Based Approach to Planning.” Paper 08F- SIW -033. In Proceed- ings of the Fall Simulation Interoperability Workshop. Simulation Interoperability...Paper 06F- SIW -003. In Proceed- 2597 Blais ings of the Fall Simulation Interoperability Workshop. Simulation Interoperability Standards Organi...MSDL).” Paper 10S- SIW -003. In Proceedings of the Spring Simulation Interoperability Workshop. Simulation Interoperability Standards Organization
Jack H. Usher; Daniel B. Jones; A. R. Stage; Benjamin A. Roach; Gilbert B. Schubert; Darrell W. Crawford; Gilbert H. Schubert; Walter Fox; Edward A. Smith; Richard E. Lowrey Sofes; Richard F. Watt
1976-01-01
The 1976 National Silviculture Workshop was held in Eugene, Oregon, on October 13-15, 1976. The objectives were to discuss second growth management of individual stands, with particular emphasis on the control of stand density.
Application transfer activity in Missouri
NASA Technical Reports Server (NTRS)
Barr, D. J.; Johannsen, C. J.
1978-01-01
Experimental demonstrations and workshop instructional courses were conducted to transfer the technology of satellite remote sensing to a wide audience of resource managers. This audience included planning commissions, state agencies, federal agencies, and special councils of the Governor. Some of the experiments and workshops are outlined.
Development and Implementation of Critical Thinking Assignments Throughout a Pharmacy Curriculum.
ERIC Educational Resources Information Center
Harris, Marilyn F.; And Others
1997-01-01
In a summer faculty development workshop, seven faculty in different pharmacy disciplines (biochemistry, therapeutics, pharmacy management, pharmaceutics, pathophysiology, pharmaceutical analysis, pharmacy administration) clarified critical thinking objectives for their courses, practiced this approach in a faculty workshop, and piloted the…
Description and evaluation of the information transfer workshop series "Coal hydrology in Virginia"
Hufschmidt, Peter W.
1984-01-01
A series of workshops was conducted in September, 1982, by staff of the Virginia Office, Mid-Atlantic District of the U.S.-Geological Survey for the benefit of coal operators, consultants, and resource managers in the coal-producing area of southwest Virginia. The purpose of the workshop series was to present hydrologic information and data by the U.S. Geological Survey collected during four years of study of the. coal hydrology of Virginia. The workshop series was held one day a week for three weeks at two locations within southwest Virginia in order to reduce travel time and overnight travel costs for participants. Results of an independently conducted questionnaire indicate the series was a success. The report summarizes the workshop preparation, organization, and presentation, and gives general conclusions and suggestions for those interested in conducting workshops.
Smith, Matthew Lee; Towne, Samuel D; Herrera-Venson, Angelica; Cameron, Kathleen; Kulinski, Kristie P; Lorig, Kate; Horel, Scott A; Ory, Marcia G
2017-06-14
Background : Alongside the dramatic increase of older adults in the United States (U.S.), it is projected that the aging population residing in rural areas will continue to grow. As the prevalence of chronic diseases and multiple chronic conditions among adults continues to rise, there is additional need for evidence-based interventions to assist the aging population to improve lifestyle behaviors, and self-manage their chronic conditions. The purpose of this descriptive study was to identify the geospatial dissemination of Chronic Disease Self-Management Education (CDSME) Programs across the U.S. in terms of participants enrolled, workshops delivered, and counties reached. These dissemination characteristics were compared across rurality designations (i.e., metro areas; non-metro areas adjacent to metro areas, and non-metro areas not adjacent to metro areas). Methods : This descriptive study analyzed data from a national repository including efforts from 83 grantees spanning 47 states from December 2009 to December 2016. Counts were tabulated and averages were calculated. Results : CDSME Program workshops were delivered in 56.4% of all U.S. counties one or more times during the study period. Of the counties where a workshop was conducted, 50.5% were delivered in non-metro areas. Of the 300,640 participants enrolled in CDSME Programs, 12% attended workshops in non-metro adjacent areas, and 7% attended workshops in non-metro non-adjacent areas. The majority of workshops were delivered in healthcare organizations, senior centers/Area Agencies on Aging, and residential facilities. On average, participants residing in non-metro areas had better workshop attendance and retention rates compared to participants in metro areas. Conclusions : Findings highlight the established role of traditional organizations/entities within the aging services network, to reach remote areas and serve diverse participants (e.g., senior centers). To facilitate growth in rural areas, technical assistance will be needed. Additional efforts are needed to bolster partnerships (e.g., sharing resources and knowledge), marketing (e.g., tailored material), and regular communication among stakeholders.
Athanasiadis, Loukas; Papaharitou, Stamatis; Salpiggidis, Georgios; Tsimtsiou, Zoi; Nakopoulou, Evangelia; Kirana, Paraskevi-Sofia; Moisidis, Kyriakos; Hatzichristou, Dimitrios
2006-01-01
To describe the development and assess the outcome of a workshop on erectile dysfunction (ED) management based on participating physicians evaluations. The study involved physicians who attended a workshop offered throughout the country, during a 3-year period. The workshop included tutorials, video-based dramatizations, and role-play sessions. A pilot study investigated the workshop's impact on physicians' attitudes toward patient-centeredness and sexual behavior issues; Patient-Practitioner Orientation Scale (PPOS) and Cross Cultural Attitude Scale (CCAS) were administered before and after the course. New knowledge acquisition, quality of presentation, and workshop's usefulness in their clinical practice were the dimensions used for workshop's evaluation. Analysis used quantitative and qualitative methods. A total of 194 questionnaires were administered during the pilot study and the response rate was 53.6%. A shift in attitudes toward patient-centeredness and less judgmental attitude toward patients' sexual attitudes were revealed (total PPOS score and Sharing subscale: P < 0.05, CCAS: P < 0.001). Six hundred physicians were asked to evaluate the workshops and the response rate was 62.3%. The tutorial session for "medical treatment of ED" (P < 0.001) and the role-play on sexual history taking (P < 0.05) received higher evaluation scores. Qualitative analysis showed that the most frequently reported category referred to the appropriateness of role-play as a teaching and awareness-raising technique (31.25%); a need for changes in clinical practice and communication patterns was identified by 20% of the participants who stressed the necessity for multidisciplinary approach, as well as the adoption of a nonjudgmental attitude toward patients. Training courses on ED management, using a combination of tutorial and interactive sessions, constitute an effective way of providing knowledge, enhancing physicians' communication skills with ED patients, and influencing attitudes toward patient-centeredness in sexual issues. Such results strongly support the establishment of sexual medicine courses at continuing medical education curricula.
Future Research Directions in Asthma. An NHLBI Working Group Report.
Levy, Bruce D; Noel, Patricia J; Freemer, Michelle M; Cloutier, Michelle M; Georas, Steve N; Jarjour, Nizar N; Ober, Carole; Woodruff, Prescott G; Barnes, Kathleen C; Bender, Bruce G; Camargo, Carlos A; Chupp, Geoff L; Denlinger, Loren C; Fahy, John V; Fitzpatrick, Anne M; Fuhlbrigge, Anne; Gaston, Ben M; Hartert, Tina V; Kolls, Jay K; Lynch, Susan V; Moore, Wendy C; Morgan, Wayne J; Nadeau, Kari C; Ownby, Dennis R; Solway, Julian; Szefler, Stanley J; Wenzel, Sally E; Wright, Rosalind J; Smith, Robert A; Erzurum, Serpil C
2015-12-01
Asthma is a common chronic disease without cure. Our understanding of asthma onset, pathobiology, classification, and management has evolved substantially over the past decade; however, significant asthma-related morbidity and excess healthcare use and costs persist. To address this important clinical condition, the NHLBI convened a group of extramural investigators for an Asthma Research Strategic Planning workshop on September 18-19, 2014, to accelerate discoveries and their translation to patients. The workshop focused on (1) in utero and early-life origins of asthma, (2) the use of phenotypes and endotypes to classify disease, (3) defining disease modification, (4) disease management, and (5) implementation research. This report summarizes the workshop and produces recommendations to guide future research in asthma.
Future Research Directions in Asthma. An NHLBI Working Group Report
Levy, Bruce D.; Freemer, Michelle M.; Cloutier, Michelle M.; Georas, Steve N.; Jarjour, Nizar N.; Ober, Carole; Woodruff, Prescott G.; Barnes, Kathleen C.; Bender, Bruce G.; Camargo, Carlos A.; Chupp, Geoff L.; Denlinger, Loren C.; Fahy, John V.; Fitzpatrick, Anne M.; Fuhlbrigge, Anne; Gaston, Ben M.; Hartert, Tina V.; Kolls, Jay K.; Lynch, Susan V.; Moore, Wendy C.; Morgan, Wayne J.; Nadeau, Kari C.; Ownby, Dennis R.; Solway, Julian; Szefler, Stanley J.; Wenzel, Sally E.; Wright, Rosalind J.; Smith, Robert A.; Erzurum, Serpil C.
2015-01-01
Asthma is a common chronic disease without cure. Our understanding of asthma onset, pathobiology, classification, and management has evolved substantially over the past decade; however, significant asthma-related morbidity and excess healthcare use and costs persist. To address this important clinical condition, the NHLBI convened a group of extramural investigators for an Asthma Research Strategic Planning workshop on September 18–19, 2014, to accelerate discoveries and their translation to patients. The workshop focused on (1) in utero and early-life origins of asthma, (2) the use of phenotypes and endotypes to classify disease, (3) defining disease modification, (4) disease management, and (5) implementation research. This report summarizes the workshop and produces recommendations to guide future research in asthma. PMID:26305520
Mayer, Larry; Lu, Zhong
2001-01-01
A basic model incorporating satellite synthetic aperture radar (SAR) interferometry of the fault rupture zone that formed during the Kocaeli earthquake of August 17, 1999, documents the elastic rebound that resulted from the concomitant elastic strain release along the North Anatolian fault. For pure strike-slip faults, the elastic rebound function derived from SAR interferometry is directly invertible from the distribution of elastic strain on the fault at criticality, just before the critical shear stress was exceeded and the fault ruptured. The Kocaeli earthquake, which was accompanied by as much as ∼5 m of surface displacement, distributed strain ∼110 km around the fault prior to faulting, although most of it was concentrated in a narrower and asymmetric 10-km-wide zone on either side of the fault. The use of SAR interferometry to document the distribution of elastic strain at the critical condition for faulting is clearly a valuable tool, both for scientific investigation and for the effective management of earthquake hazard.
Knowledge-Based Vision Techniques for the Autonomous Land Vehicle Program
1991-10-01
Knowledge System The CKS is an object-oriented knowledge database that was originally designed to serve as the central information manager for a...34 Representation Space: An Approach to the Integra- tion of Visual Information ," Proc. of DARPA Image Understanding Workshop, Palo Alto, CA, pp. 263-272, May 1989...Strat, " Information Management in a Sensor-Based Au- tonomous System," Proc. DARPA Image Understanding Workshop, University of Southern CA, Vol.1, pp
Workshop-based methodology to understand the risks in grain export inspection and certification.
Wilson, John R; Vaegen-Lloyd, Jo-Roxy; Caponecchia, Carlo
2009-07-01
Much of the human factors contribution in risk assessment and risk management has been focused on systems or product safety; the profession has a much smaller research base regarding risks to do with regulation, certification and public policy, for example. This paper discusses an explicitly human factors contribution to understanding and managing risk for the inspection and export certification of grain and plant products in Australia. Training and awareness workshops, incorporating elements of focus groups, were run for 12 groups of staff and managers from the government department concerned. As well as training in risk management the workshops were used to come to an understanding of the work of the inspectors and other staff, to identify the sources of risk to the successful completion of their work and to develop the basis for a risk assessment framework and tool. The paper is methodological in focus and describes the development and running of the workshops and explains how a human factors oriented risk register was developed on the basis of identification of potential threats and errors in the system. Whilst the contribution of ergonomics is increasingly important as regards safety risk assessment, professionals have been less active as regards business, public policy and even engineering risk. This paper describes an approach within which a new domain was studied and the risks of all kinds identified, preparatory to development of a risk assessment tool.
NASA Astrophysics Data System (ADS)
Xu, Jiuping; Zhong, Zhengqiang; Xu, Lei
2015-10-01
In this paper, an integrated system health management-oriented adaptive fault diagnostics and model for avionics is proposed. With avionics becoming increasingly complicated, precise and comprehensive avionics fault diagnostics has become an extremely complicated task. For the proposed fault diagnostic system, specific approaches, such as the artificial immune system, the intelligent agents system and the Dempster-Shafer evidence theory, are used to conduct deep fault avionics diagnostics. Through this proposed fault diagnostic system, efficient and accurate diagnostics can be achieved. A numerical example is conducted to apply the proposed hybrid diagnostics to a set of radar transmitters on an avionics system and to illustrate that the proposed system and model have the ability to achieve efficient and accurate fault diagnostics. By analyzing the diagnostic system's feasibility and pragmatics, the advantages of this system are demonstrated.
PACE: Pharmacists use the power of communication in paediatric asthma.
Elaro, Amanda; Shah, Smita; Pomare, Luca N; L Armour, Carol; Z Bosnic-Anticevich, Sinthia
2014-10-01
Paediatric asthma is a public health burden in Australia despite the availability of national asthma guidelines. Community pharmacy interventions focusing on paediatric asthma are scarce. Practitioner Asthma Communication and Education (PACE) is an evidence-based program, developed in the USA for general practice physicians, aimed at addressing the issues of poor clinician-patient communication in the management of paediatric asthma. This program has been shown to improve paediatric asthma management practices of general practitioners in the USA and Australia. The development of a PACE program for community pharmacists will fill a void in the current armamentarium for pharmacist-patient care. To adapt the educational program, PACE, to the community pharmacy setting. To test the feasibility of the new program for pharmacy and to explore its potential impact on pharmacists' communication skills and asthma related practices. Community pharmacies located within the Sydney metropolitan. The PACE framework was reviewed by the research team and amended in order to ensure its relevance within the pharmacy context, thereby developing PACE for Pharmacy. Forty-four pharmacists were recruited and trained in small groups in the PACE for Pharmacy workshops. Pharmacists' satisfaction and acceptability of the workshops, confidence in using communication strategies pre- and post-workshop and self-reported behaviour change post workshop were evaluated. Pharmacist self-reported changes in communication and teaching behaviours during a paediatric asthma consultation. All 44 pharmacists attended both workshops, completed pre- and post-workshop questionnaires and provided feedback on the workshops (100 % retention). The participants reported a high level of satisfaction and valued the interactive nature of the workshops. Following the PACE for Pharmacy program, pharmacists reported significantly higher levels in using the communication strategies, confidence in their application and their helpfulness. Pharmacists checked for written asthma self-management plan possession and inhaler device technique more regularly, and provided verbal instructions more frequently to paediatric asthma patients/carers at the initiation of a new medication. This study provides preliminary evidence that the PACE program can be translated into community pharmacy. PACE for Pharmacy positively affected self-reported communication and education behaviours of pharmacists. The high response rate shows that pharmacists are eager to expand on their clinical role in primary healthcare.
Environmental Management Science Program Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1998-07-01
This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.
Software reliability through fault-avoidance and fault-tolerance
NASA Technical Reports Server (NTRS)
Vouk, Mladen A.; Mcallister, David F.
1993-01-01
Strategies and tools for the testing, risk assessment and risk control of dependable software-based systems were developed. Part of this project consists of studies to enable the transfer of technology to industry, for example the risk management techniques for safety-concious systems. Theoretical investigations of Boolean and Relational Operator (BRO) testing strategy were conducted for condition-based testing. The Basic Graph Generation and Analysis tool (BGG) was extended to fully incorporate several variants of the BRO metric. Single- and multi-phase risk, coverage and time-based models are being developed to provide additional theoretical and empirical basis for estimation of the reliability and availability of large, highly dependable software. A model for software process and risk management was developed. The use of cause-effect graphing for software specification and validation was investigated. Lastly, advanced software fault-tolerance models were studied to provide alternatives and improvements in situations where simple software fault-tolerance strategies break down.
Proceedings of the Second Pilot Climate Data System Workshop
NASA Technical Reports Server (NTRS)
1986-01-01
The proceedings of the workshop held on January 29 and 30, 1986 are discussed. Data management, satellite radiance data, clouds, ultraviolet flux variations in the upper atmosphere, rainfall during El Nino events, and the use of optical disks are among the topics covered.
ASSESSING AND MANAGING MERCURY FROM HISTORIC AND CURRENT MINING ACTIVITIES
In order for ORD to address uncertainties resulting from past or historical mining practices a technology transfer workshop was conducted in November, 2000 in San Francisco, CA. Two primary objectives for this workshop were: 1) identify state-of-the-science practices and techniqu...
Keuroghlian, Alex S; Palmer, Brian A; Choi-Kain, Lois W; Borba, Christina P C; Links, Paul S; Gunderson, John G
2016-08-01
The effect that attending a 1-day workshop on Good Psychiatric Management (GPM) had on attitudes about borderline personality disorder (BPD) was assessed among 297 clinicians. Change was recorded by comparing before and after scores on a 9-item survey previously developed to assess the effects of workshops on Systems Training for Emotional Predictability and Problem Solving (STEPPS). Participants reported decreased inclination to avoid borderline patients, dislike of borderline patients, and belief that BPD's prognosis is hopeless, as well as increased feeling of competence, belief that borderline patients have low self-esteem, feeling of being able to make a positive difference, and belief that effective psychotherapies exist. Less clinical experience was related to an increased feeling of competence and belief that borderline patients have low self-esteem. These findings were compared to those from the STEPPS workshop. This assessment demonstrates GPM's potential for training clinicians to meet population-wide needs related to borderline personality disorder.
Report from the Passive Microwave Data Set Management Workshop
NASA Technical Reports Server (NTRS)
Armstrong, Ed; Conover, Helen; Goodman, Michael; Krupp, Brian; Liu, Zhong; Moses, John; Ramapriyan, H. K.; Scott, Donna; Smith, Deborah; Weaver, Ronald
2011-01-01
Passive microwave data sets are some of the most important data sets in the Earth Observing System Data and Information System (EOSDIS), providing data as far back as the early 1970s. The widespread use of passive microwave (PM) radiometer data has led to their collection and distribution over the years at several different Earth science data centers. The user community is often confused by this proliferation and the uneven spread of information about the data sets. In response to this situation, a Passive Microwave Data Set Management Workshop was held 17 ]19 May 2011 at the Global Hydrology Resource Center, sponsored by the NASA Earth Science Data and Information System (ESDIS) Project. The workshop attendees reviewed all primary (Level 1 ]3) PM data sets from NASA and non ]NASA sensors held by NASA Distributed Active Archive Centers (DAACs), as well as high ]value data sets from other NASA ]funded organizations. This report provides the key findings and recommendations from the workshop as well as detailed tabluations of the datasets considered.
Keuroghlian, Alex S.; Palmer, Brian A.; Choi-Kain, Lois W.; Borba, Christina P. C.; Links, Paul S.; Gunderson, John G.
2015-01-01
The effect that attending a 1-day workshop on good psychiatric management (GPM) had on attitudes about borderline personality disorder (BPD) was assessed among 297 clinicians. Change was recorded by comparing before and after scores on a 9-item survey previously developed to assess the effects of workshops on Systems Training for Emotional Predictability and Problem Solving (STEPPS). Participants reported decreased inclination to avoid borderline patients, dislike of borderline patients, and belief that BPD’s prognosis is hopeless, as well as increased feeling of competence, belief that borderline patients have low self-esteem, feeling of being able to make a positive difference, and belief that effective psychotherapies exist. Less clinical experience was related to an increased feeling of competence and belief that borderline patients have low self-esteem. These findings were compared to those from the STEPPS workshop. This assessment demonstrates GPM’s potential for training clinicians to meet population-wide needs related to borderline personality disorder. PMID:26111249
Fault Management Design Strategies
NASA Technical Reports Server (NTRS)
Day, John C.; Johnson, Stephen B.
2014-01-01
Development of dependable systems relies on the ability of the system to determine and respond to off-nominal system behavior. Specification and development of these fault management capabilities must be done in a structured and principled manner to improve our understanding of these systems, and to make significant gains in dependability (safety, reliability and availability). Prior work has described a fundamental taxonomy and theory of System Health Management (SHM), and of its operational subset, Fault Management (FM). This conceptual foundation provides a basis to develop framework to design and implement FM design strategies that protect mission objectives and account for system design limitations. Selection of an SHM strategy has implications for the functions required to perform the strategy, and it places constraints on the set of possible design solutions. The framework developed in this paper provides a rigorous and principled approach to classifying SHM strategies, as well as methods for determination and implementation of SHM strategies. An illustrative example is used to describe the application of the framework and the resulting benefits to system and FM design and dependability.
Hamandi, Khalid; Beniczky, Sandor; Diehl, Beate; Kandler, Rosalind H; Pressler, Ronit M; Sen, Arjune; Solomon, Juliet; Walker, Matthew C; Bagary, Manny
2017-08-01
Inpatient video-EEG monitoring (VEM) is an important investigation in patients with seizures or blackouts, and in the pre-surgical workup of patients with epilepsy. There has been an expansion in the number of Epilepsy Monitoring Units (EMU) in the UK offering VEM with a necessary increase in attention on quality and safety. Previous surveys have shown variation across centres on issues including consent and patient monitoring. In an effort to bring together healthcare professionals in the UK managing patients on EMU, we conducted an online survey of current VEM practice and held a one-day workshop convened under the auspices of the British Chapter of the ILAE. The survey and workshop aimed to cover all aspects of VEM, including pre-admission, consent procedures, patient safety, drug reduction and reinstatement, seizure management, staffing levels, ictal testing and good data recording practice. This paper reports on the findings of the survey, the workshop presentations and workshop discussions. 32 centres took part in the survey and there were representatives from 22 centres at the workshop. There was variation in protocols, procedures and consent processes between units, and levels of observation of monitored patients. Nevertheless, the workshop discussion found broad areas of agreement on points. A survey and workshop of UK epilepsy monitoring units found that some variability in practice is inevitable due to different local arrangements and patient groups under investigation. However, there were areas of clear consensus particularly in relation to consent and patient safety that can be applied to most units and form a basis for setting minimum standards. Copyright © 2017 British Epilepsy Association. Published by Elsevier Ltd. All rights reserved.
Understanding the Deep Earth: Slabs, Drips, Plumes and More - An On the Cutting Edge Workshop
NASA Astrophysics Data System (ADS)
Williams, M. L.; Mogk, D. W.; McDaris, J. R.
2010-12-01
Exciting new science is emerging from the study of the deep Earth using a variety of approaches: observational instrumentation (e.g. EarthScope’s USArray; IRIS), analysis of rocks (xenoliths, isotopic tracers), experimental methods (COMPRES facilities), and modeling (physical and computational, e.g. CIG program). New images and models of active faults, subducting plates, mantle drips, and rising plumes are spurring a new excitement about deep Earth processes and connections between Earth’s internal systems, the plate tectonic system, and the physiography of Earth’s surface. The integration of these lines of research presents unique opportunities and also challenges in geoscience education. How can we best teach about the architecture, composition, and processes of Earth where it is hidden from direct observation. How can we make deep Earth science relevant and meaningful to students across the geoscience curriculum? And how can we use the exciting new discoveries about Earth processes to attract new students into science? To explore the intersection of research and teaching about the deep Earth, a virtual workshop was convened in February 2010 for experts in deep Earth research and undergraduate geoscience education. The six-day workshop consisted of online plenary talks, large and small group discussions, asynchronous contributions using threaded listservs and web-based work spaces, as well as development and review of new classroom and laboratory activities. The workshop goals were to: 1) help participants stay current about data, tools, services, and research related to the deep earth, 2) address the "big science questions" related to deep earth (e.g. plumes, slabs, drips, post-perovskite, etc.) and explore exciting new scientific approaches, 3) to consider ways to effectively teach about "what can't be seen", at least not directly, and 4) develop and review classroom teaching activities for undergraduate education using these data, tools, services, and research results to facilitate teaching about the deep earth across the geoscience curriculum. Another goal of the workshop was to experiment with, and evaluate the effectiveness of, the virtual format. Although there are advantages to face-to-face workshops, the virtual format was remarkably effective. The interactive discussions during synchronous presentations were vibrant, and the virtual format allowed participants to introduce references, images and ideas in real-time. The virtual nature of the workshop allowed participation by those who are not able to attend a traditional workshop, with an added benefit that participants had direct access to all their research and teaching materials to share with the workshop. Some participants broadcast the workshop ‘live’ to their classes and many brought discussions directly from the presentation to the classroom. The workshop webpage includes the workshop program with links to recordings of all presentations, discussion summaries, a collection of recommended resources about deep Earth research, and collections of peer-reviewed instructional activities. http://serc.carleton.edu/NAGTWorkshops/deepearth/index.html
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guenther, Chris; Garg, Rahul
2013-08-19
The Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) sponsored a workshop on non-Newtonian multiphase slurry at NETL’s Morgantown campus August 19 and 20, 2013. The objective of this special two-day meeting of 20-30 invited experts from industry, National Labs and academia was to identify and address technical issues associated with handling non-Newtonian multiphase slurries across various facilities managed by DOE. Particular emphasis during this workshop was placed on applications managed by the Office of Environmental Management (EM). The workshop was preceded by two webinars wherein personnel from ORP and NETL provided background information on the Hanford WTP projectmore » and discussed the critical design challenges facing this project. In non-Newtonian fluids, viscosity is not constant and exhibits a complex dependence on applied shear stress or deformation. Many applications under EM’s tank farm mission involve non-Newtonian slurries that are multiphase in nature; tank farm storage and handling, slurry transport, and mixing all involve multiphase flow dynamics, which require an improved understanding of the mechanisms responsible for rheological changes in non-Newtonian multiphase slurries (NNMS). To discuss the issues in predicting the behavior of NNMS, the workshop focused on two topic areas: (1) State-of-the-art in non-Newtonian Multiphase Slurry Flow, and (2) Scaling up with Confidence and Ensuring Safe and Reliable Long-Term Operation.« less
... Center Fellows-in-Training Grants & Awards Program Directors Practice Resources ASTHMA IQ Consultation and Referral Guidelines Practice Management Tips Practice Management Workshop Practice Tools Running ...
A System for Fault Management and Fault Consequences Analysis for NASA's Deep Space Habitat
NASA Technical Reports Server (NTRS)
Colombano, Silvano; Spirkovska, Liljana; Baskaran, Vijaykumar; Aaseng, Gordon; McCann, Robert S.; Ossenfort, John; Smith, Irene; Iverson, David L.; Schwabacher, Mark
2013-01-01
NASA's exploration program envisions the utilization of a Deep Space Habitat (DSH) for human exploration of the space environment in the vicinity of Mars and/or asteroids. Communication latencies with ground control of as long as 20+ minutes make it imperative that DSH operations be highly autonomous, as any telemetry-based detection of a systems problem on Earth could well occur too late to assist the crew with the problem. A DSH-based development program has been initiated to develop and test the automation technologies necessary to support highly autonomous DSH operations. One such technology is a fault management tool to support performance monitoring of vehicle systems operations and to assist with real-time decision making in connection with operational anomalies and failures. Toward that end, we are developing Advanced Caution and Warning System (ACAWS), a tool that combines dynamic and interactive graphical representations of spacecraft systems, systems modeling, automated diagnostic analysis and root cause identification, system and mission impact assessment, and mitigation procedure identification to help spacecraft operators (both flight controllers and crew) understand and respond to anomalies more effectively. In this paper, we describe four major architecture elements of ACAWS: Anomaly Detection, Fault Isolation, System Effects Analysis, and Graphic User Interface (GUI), and how these elements work in concert with each other and with other tools to provide fault management support to both the controllers and crew. We then describe recent evaluations and tests of ACAWS on the DSH testbed. The results of these tests support the feasibility and strength of our approach to failure management automation and enhanced operational autonomy
Radiation and Health: A Workshop for Science Educators
NASA Astrophysics Data System (ADS)
Krieger, Kenneth
2010-03-01
This workshop covers nuclear science and technology topics suitable for science teachers to use in grade 4-12 classes. Subjects included are Fundamentals of Radiation, Exposure to natural and man- made Radiation, Cellular Biology and Radiation Effects, Radioactive Waste Management, Health Physics and Radiation Physics, and Career possibilities in Nuclear Technology. Schools of participants will receive a working Geiger Counter. Workshop presenter is a TEA-approved CPE Provider. Limited to 20 participants - 3 hours - Cost 2.00
An Efficient Algorithm for Server Thermal Fault Diagnosis Based on Infrared Image
NASA Astrophysics Data System (ADS)
Liu, Hang; Xie, Ting; Ran, Jian; Gao, Shan
2017-10-01
It is essential for a data center to maintain server security and stability. Long-time overload operation or high room temperature may cause service disruption even a server crash, which would result in great economic loss for business. Currently, the methods to avoid server outages are monitoring and forecasting. Thermal camera can provide fine texture information for monitoring and intelligent thermal management in large data center. This paper presents an efficient method for server thermal fault monitoring and diagnosis based on infrared image. Initially thermal distribution of server is standardized and the interest regions of the image are segmented manually. Then the texture feature, Hu moments feature as well as modified entropy feature are extracted from the segmented regions. These characteristics are applied to analyze and classify thermal faults, and then make efficient energy-saving thermal management decisions such as job migration. For the larger feature space, the principal component analysis is employed to reduce the feature dimensions, and guarantee high processing speed without losing the fault feature information. Finally, different feature vectors are taken as input for SVM training, and do the thermal fault diagnosis after getting the optimized SVM classifier. This method supports suggestions for optimizing data center management, it can improve air conditioning efficiency and reduce the energy consumption of the data center. The experimental results show that the maximum detection accuracy is 81.5%.
On the design of fault-tolerant robotic manipulator systems
NASA Technical Reports Server (NTRS)
Tesar, Delbert
1993-01-01
Robotic systems are finding increasing use in space applications. Many of these devices are going to be operational on board the Space Station Freedom. Fault tolerance has been deemed necessary because of the criticality of the tasks and the inaccessibility of the systems to maintenance and repair. Design for fault tolerance in manipulator systems is an area within robotics that is without precedence in the literature. In this paper, we will attempt to lay down the foundations for such a technology. Design for fault tolerance demands new and special approaches to design, often at considerable variance from established design practices. These design aspects, together with reliability evaluation and modeling tools, are presented. Mechanical architectures that employ protective redundancies at many levels and have a modular architecture are then studied in detail. Once a mechanical architecture for fault tolerance has been derived, the chronological stages of operational fault tolerance are investigated. Failure detection, isolation, and estimation methods are surveyed, and such methods for robot sensors and actuators are derived. Failure recovery methods are also presented for each of the protective layers of redundancy. Failure recovery tactics often span all of the layers of a control hierarchy. Thus, a unified framework for decision-making and control, which orchestrates both the nominal redundancy management tasks and the failure management tasks, has been derived. The well-developed field of fault-tolerant computers is studied next, and some design principles relevant to the design of fault-tolerant robot controllers are abstracted. Conclusions are drawn, and a road map for the design of fault-tolerant manipulator systems is laid out with recommendations for a 10 DOF arm with dual actuators at each joint.
NASA Astrophysics Data System (ADS)
Richardson, R. M.; Ormand, C. J.; MacDonald, H.; Dunbar, R. W.; Allen-King, R. M.; Manduca, C. A.
2010-12-01
Launching an academic career presents a number of challenges. A recent article in the Chronicle of Higher Education depicts academia as an “ivory sweatshop,” citing rising standards for tenure. Most graduate programs provide minimal training for life beyond graduate school. The professional development program “On the Cutting Edge” fills this gap by providing workshops and web resources on academic careers for graduate students, postdoctoral fellows, and early career faculty. These workshops and web resources address a wide range of topics related to teaching, research, and managing one’s career, tailored for each group. The Preparing for an Academic Career in the Geosciences workshop to help graduate students and postdoctoral fellows make the transition into an academic career has been offered annually since 2003. It provides a panel on academic careers in different institutional settings, sessions on research on learning, various teaching strategies, design of effective teaching activities, moving research forward to new settings, effective teaching and research statements, the job search process, negotiation, and presenting oneself to others. Complementary online resources (http://serc.carleton.edu/NAGTWorkshops/careerprep/index.html) focus on these topics. The workshops and web resources offer guidance for each step of the job search process, for developing and teaching one’s own courses, and for making the transition from being a research student to being in charge of a research program. Online resources also include case studies of successful dual career couples, documenting their job search strategies. A four-day workshop for Early Career Geoscience Faculty: Teaching, Research, and Managing Your Career, offered annually since 1999, provides sessions on teaching strategies, course design, developing a strategic plan for research, supervising student researchers, navigating departmental and institutional politics, preparing for tenure, time and task management, and more. Complementary online resources (http://serc.carleton.edu/NAGTWorkshops/earlycareer/index.html) also address these topics. The workshops and web resources offer guidance for becoming an efficient and effective teacher, for developing a thriving research program, for staying on track for tenure, and for managing a balance of one’s personal and professional lives. Online resources feature a collection of successful grant proposals, profiles of successful researchers and their collaborations with their students, and profiles of geoscience faculty from a variety of institutions describing how they achieve balance in their lives. Participants in both workshops overwhelmingly report that the workshop met or exceeded their expectations, that they feel much better prepared to move forward in their careers as a result of the workshops, and that they will use the website in the future. The two sets of web pages receive more than 7,000 visitors each month.
The U.S./IAEA Workshop on Software Sustainability for Safeguards Instrumentation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pepper S. E.; .; Worrall, L.
2014-08-08
The U.S. National Nuclear Security Administration’s Next Generation Safeguards Initiative, the U.S. Department of State, and the International Atomic Energy Agency (IAEA) organized a a workshop on the subject of ”Software Sustainability for Safeguards Instrumentation.” The workshop was held at the Vienna International Centre in Vienna, Austria, May 6-8, 2014. The workshop participants included software and hardware experts from national laboratories, industry, government, and IAEA member states who were specially selected by the workshop organizers based on their experience with software that is developed for the control and operation of safeguards instrumentation. The workshop included presentations, to orient the participantsmore » to the IAEA Department of Safeguards software activities related to instrumentation data collection and processing, and case studies that were designed to inspire discussion of software development, use, maintenance, and upgrades in breakout sessions and to result in recommendations for effective software practices and management. This report summarizes the results of the workshop.« less
Improving physician-patient communication in cancer care: outcome of a workshop for oncologists.
Baile, W F; Lenzi, R; Kudelka, A P; Maguire, P; Novack, D; Goldstein, M; Myers, E G; Bast, R C
1997-01-01
Physicians caring for cancer patients receive little formal training in difficult communications such as breaking bad news, discussing life support, and addressing patients' emotional concerns. The authors conducted a three-day workshop in communication skills for nine oncology attendings and three fellows. Topics for the workshop were selected by participants by a pre-workshop questionnaire. Small groups of four to five participants interviewed simulated patients who role-played scripts based on the selected topics. Sessions on self-awareness and one on planning for continuing the work of the group after the workshop were included. Responses to pretest and posttest questionnaires showed that the workshop increased the participants' confidence in a number of communication areas and also in managing physician burnout. Process issues such as patient death and expectations for cure were also discussed. Interactive workshops offer a promising way of teaching communication skills and aspects of the physician-patient relationship to oncologists. Conclusions regarding outcome, however, are preliminary and tentative, and long-term results are uncertain.
Dehal, Paramvir
2018-02-06
Berkeley Lab's Paramvir Dehal on "Managing and Storing large Datasets in MicrobesOnline, metaMicrobesOnline and the DOE Knowledgebase" at the Metagenomics Informatics Challenges Workshop held at the DOE JGI on October 12-13, 2011.
How Can Remote Sensing Be Used for Water Quality Monitoring?
“How can remote sensing address information needs and gaps in water quality and quantity management?” was a workshop convened during the biennial National Water Quality Monitoring Conference 2014, held in Cincinnati, OH. The focus of this workshop was to provide an o...
76 FR 70420 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... United States Coast Guard will hold a Commercial Fishing Gear Stowage Workshop to consider actions... Fisheries Training Center, 5200 East Hospital Road, Buzzards Bay, MA 02542. The public must preregister for this workshop to facilitate entrance to this secure facility, see supplementary information for details...
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France). Div. of Marine Sciences.
This report includes nine papers prepared for a workshop on coral reef survey management and assessment methods in Asia and the Pacific. The papers are: "A Contrast in Methodologies between Surveying and Testing" (Charles Birkeland); "Coral Reef Survey Methods in the Andaman Sea" (Hansa Chansang); "A Review of Coral Reef…
Bowen, Jo; Davies, Laurie; Burdett, Garry John; Barber, Christopher Michael
2017-01-01
The duty to manage asbestos in non-domestic premises is described in the Control of Asbestos Regulations 2012. Health and Safety Executive (HSE) policy and guidance on asbestos in the built environment in Great Britain is that asbestos-containing materials (ACMs) that are in good condition and unlikely to be disturbed can be managed in place. Where ACMs are in poor condition or likely to be disturbed they should be repaired, encapsulated or, if necessary, removed. HSE and Government Office for Science hosted a stakeholder workshop to consider evidence on the management of ACMs in public buildings. Invitees attended from a range of backgrounds (including regulatory, government, academic, medical, public interest groups, and professional service providers). Participants considered the evidence, suggested nine evidence gap areas and ranked these according to preference in an anonymous vote. The top three suggested evidence gaps were: (i) the comparative risks of managing ACMs in place versus removal; (ii) improved measurement techniques at lower fibre concentrations; and (iii) building the evidence base on the effectiveness of asbestos management and safe removal. HSE will use the workshop outputs to inform its research planning. It is anticipated that a number of initiatives for shared research will be explored. © Crown copyright 2017.
NASA Technical Reports Server (NTRS)
Ashworth, Barry R.
1989-01-01
A description is given of the SSM/PMAD power system automation testbed, which was developed using a systems engineering approach. The architecture includes a knowledge-based system and has been successfully used in power system management and fault diagnosis. Architectural issues which effect overall system activities and performance are examined. The knowledge-based system is discussed along with its associated automation implications, and interfaces throughout the system are presented.
Modeling Off-Nominal Behavior in SysML
NASA Technical Reports Server (NTRS)
Day, John C.; Donahue, Kenneth; Ingham, Michel; Kadesch, Alex; Kennedy, Andrew K.; Post, Ethan
2012-01-01
Specification and development of fault management functionality in systems is performed in an ad hoc way - more of an art than a science. Improvements to system reliability, availability, safety and resilience will be limited without infusion of additional formality into the practice of fault management. Key to the formalization of fault management is a precise representation of off-nominal behavior. Using the upcoming Soil Moisture Active-Passive (SMAP) mission for source material, we have modeled the off-nominal behavior of the SMAP system during its initial spin-up activity, using the System Modeling Language (SysML). In the course of developing these models, we have developed generic patterns for capturing off-nominal behavior in SysML. We show how these patterns provide useful ways of reasoning about the system (e.g., checking for completeness and effectiveness) and allow the automatic generation of typical artifacts (e.g., success trees and FMECAs) used in system analyses.
Training veterinarians and agricultural advisers on a novel tool for tail biting prevention.
Vom Brocke, A L; Madey, D P; Gauly, M; Schrader, L; Dippel, S
2015-01-01
Many health and welfare problems in modern livestock production are multifactorial problems which require innovative solutions, such as novel risk assessment and management tools. However, the best way to distribute such novel - and usually complex - tools to the key applicants still has to be discussed. This paper shares experiences from distributing a novel tail biting prevention tool ('SchwIP') to 115 farm advisers and 19 veterinarians in 23 one-day workshops. Participants gave written and oral feedback at the end of the workshops, which was later analysed together with the number of farms they had visited after the workshops. Workshop groups were categorised into groups showing (a) HIGH, (b) INTermediate or (c) LOW levels of antagonism against SchwIP or parts of it during workshop discussions. Group types did not significantly differ in their evaluation of knowledge transfer. However, HIGH group members evaluated the on-farm usability of the tool significantly lower in the workshop feedback and tended to visit fewer farms. As antagonistic discussion can influence workshop output, future workshop leaders should strive for basic communication training as well as some group leadership experience before setting up and leading workshops.
The Design of a Fault-Tolerant COTS-Based Bus Architecture for Space Applications
NASA Technical Reports Server (NTRS)
Chau, Savio N.; Alkalai, Leon; Tai, Ann T.
2000-01-01
The high-performance, scalability and miniaturization requirements together with the power, mass and cost constraints mandate the use of commercial-off-the-shelf (COTS) components and standards in the X2000 avionics system architecture for deep-space missions. In this paper, we report our experiences and findings on the design of an IEEE 1394 compliant fault-tolerant COTS-based bus architecture. While the COTS standard IEEE 1394 adequately supports power management, high performance and scalability, its topological criteria impose restrictions on fault tolerance realization. To circumvent the difficulties, we derive a "stack-tree" topology that not only complies with the IEEE 1394 standard but also facilitates fault tolerance realization in a spaceborne system with limited dedicated resource redundancies. Moreover, by exploiting pertinent standard features of the 1394 interface which are not purposely designed for fault tolerance, we devise a comprehensive set of fault detection mechanisms to support the fault-tolerant bus architecture.
Review: Evaluation of Foot-and-Mouth Disease Control Using Fault Tree Analysis.
Isoda, N; Kadohira, M; Sekiguchi, S; Schuppers, M; Stärk, K D C
2015-06-01
An outbreak of foot-and-mouth disease (FMD) causes huge economic losses and animal welfare problems. Although much can be learnt from past FMD outbreaks, several countries are not satisfied with their degree of contingency planning and aiming at more assurance that their control measures will be effective. The purpose of the present article was to develop a generic fault tree framework for the control of an FMD outbreak as a basis for systematic improvement and refinement of control activities and general preparedness. Fault trees are typically used in engineering to document pathways that can lead to an undesired event, that is, ineffective FMD control. The fault tree method allows risk managers to identify immature parts of the control system and to analyse the events or steps that will most probably delay rapid and effective disease control during a real outbreak. The present developed fault tree is generic and can be tailored to fit the specific needs of countries. For instance, the specific fault tree for the 2001 FMD outbreak in the UK was refined based on control weaknesses discussed in peer-reviewed articles. Furthermore, the specific fault tree based on the 2001 outbreak was applied to the subsequent FMD outbreak in 2007 to assess the refinement of control measures following the earlier, major outbreak. The FMD fault tree can assist risk managers to develop more refined and adequate control activities against FMD outbreaks and to find optimum strategies for rapid control. Further application using the current tree will be one of the basic measures for FMD control worldwide. © 2013 Blackwell Verlag GmbH.
NASA Technical Reports Server (NTRS)
Melcher, Kevin J.; Sowers, T. Shane; Maul, William A.
2005-01-01
The constraints of future Exploration Missions will require unique Integrated System Health Management (ISHM) capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays all require an ISHM system that can span distinct yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation, and support the Exploration Mission from beginning to end. NASA Glenn Research Center has developed and applied health management system technologies to aerospace propulsion systems for almost two decades. Lessons learned from past activities help define the approach to proper ISHM development: sensor selection- identifies sensor sets required for accurate health assessment; data qualification and validation-ensures the integrity of measurement data from sensor to data system; fault detection and isolation-uses measurements in a component/subsystem context to detect faults and identify their point of origin; information fusion and diagnostic decision criteria-aligns data from similar and disparate sources in time and use that data to perform higher-level system diagnosis; and verification and validation-uses data, real or simulated, to provide variable exposure to the diagnostic system for faults that may only manifest themselves in actual implementation, as well as faults that are detectable via hardware testing. This presentation describes a framework for developing health management systems and highlights the health management research activities performed by the Controls and Dynamics Branch at the NASA Glenn Research Center. It illustrates how those activities contribute to the development of solutions for Integrated System Health Management.
Workshop on Agricultural Air Quality: State of the science
NASA Astrophysics Data System (ADS)
Aneja, Viney P.; Blunden, Jessica; Roelle, Paul A.; Schlesinger, William H.; Knighton, Raymond; Niyogi, Dev; Gilliam, Wendell; Jennings, Greg; Duke, Clifford S.
The first Workshop on Agricultural Air Quality: State of the Science was held at the Bolger Center in Potomac, Maryland from 4 to 8 June 2006. This international conference assembled approximately 350 people representing 25 nations from 5 continents, with disciplines ranging from atmospheric chemistry to soil science. The workshop was designed as an open forum in which participants could openly exchange the most current knowledge and learn about numerous international perspectives regarding agricultural air quality. Participants represented many stakeholder groups concerned with the growing need to assess agricultural impacts on the atmosphere and to develop beneficial policies to improve air quality. The workshop focused on identifying methods to improve emissions inventories and best management practices for agriculture. Workshop participants also made recommendations for technological and methodological improvements in current emissions measurement and modeling practices. The workshop commenced with a session on agricultural emissions and was followed by international perspectives from the United States, Europe, Australia, India, and South America. This paper summarizes the findings and issues of the workshop and articulates future research needs. These needs were identified in three general areas: (1) improvement of emissions measurement; (2) development of appropriate emission factors; and (3) implementation of best management practices (BMPs) to minimize negative environmental impacts. Improvements in the appropriate measurements will inform decisions regarding US farming practices. A need was demonstrated for a national/international network to monitor atmospheric emissions from agriculture and their subsequent depositions to surrounding areas. Information collected through such a program may be used to assess model performance and could be critical for evaluating any future regulatory policies or BMPs. The workshop concluded that efforts to maximize benefits and reduce detrimental effects of agricultural production need to transcend disciplinary, geographic, and political boundaries. Also, such efforts should involve natural and social scientists, economists, engineers, business leaders, and decision makers. The workshop came to the conclusion that through these collaborative efforts improvements in air quality from agricultural practices will begin to take effect.
Bencala, Kenneth E.; Hamilton, David B.; Petersen, James H.
2006-01-01
Federal and state agencies need improved scientific analysis to support riverine ecosystem management. The ability of the USGS to integrate geologic, hydrologic, chemical, geographic, and biological data into new tools and models provides unparalleled opportunities to translate the best riverine science into useful approaches and usable information to address issues faced by river managers. In addition to this capability to provide integrated science, the USGS has a long history of providing long-term and nationwide information about natural resources. The USGS is now in a position to advance its ability to provide the scientific support for the management of riverine ecosystems. To address this need, the USGS held a listening session in Fort Collins, Colorado in April 2006. Goals of the workshop were to: 1) learn about the key resource issues facing DOI, other Federal, and state resource management agencies; 2) discuss new approaches and information needs for addressing these issues; and 3) outline a strategy for the USGS role in supporting riverine ecosystem management. Workshop discussions focused on key components of a USGS strategy: Communications, Synthesis, and Research. The workshop identified 3 priority actions the USGS can initiate now to advance its capabilities to support integrated science for resource managers in partner government agencies and non-governmental organizations: 1) Synthesize the existing science of riverine ecosystem processes to produce broadly applicable conceptual models, 2) Enhance selected ongoing instream flow projects with complementary interdisciplinary studies, and 3) Design a long-term, watershed-scale research program that will substantively reinvent riverine ecosystem science. In addition, topical discussion groups on hydrology, geomorphology, aquatic habitat and populations, and socio-economic analysis and negotiation identified eleven important complementary actions required to advance the state of the science and to develop the tools for supporting decisions on riverine ecosystem management. These eleven actions lie within the continuum of Communications, Synthesis, and Research.
NASA Technical Reports Server (NTRS)
Estes, J. E.; Eisgruber, L.
1981-01-01
Important points presented and recommendations made at an information and decision processes workshop held in Asilomar, California; at a data and information performance workshop held in Houston, Texas; and at a data base use and management workshop held near San Jose, California are summarized. Issues raised at a special session of the Soil Conservation Society of America's remote sensing for resource management conference in Kansas City, Missouri are also highlighted. The goals, status and activities of the NASA program definition study of basic research requirements, the necessity of making the computer science community aware of user needs with respect to information related to renewable resources, performance parameters and criteria for judging federal information systems, and the requirements and characteristics of scientific data bases are among the topics reported.
Overview and Status of the Bioastronautics Critical Path Roadmap (BCPR)
NASA Technical Reports Server (NTRS)
Charles, John
2004-01-01
Viewgraphs on the status and overview of the Bioastronautics Critical Path Roadmap (BCPR) are presented. The topics include: 1) BCPR Objectives; 2) BCPR and OBPR Program Management; 3) BCPR Disciplines & Cross-Cutting Areas; 4) Characteristics of BCPR Reference Missions; 5) Bioastronautics Timetable (notional); 6) BCPR Processes Risk Identification, Assessment, and Management; 7) Types of BCPR Risks; 8) Enabling Questions Categories; 9) Risk Mitigation Status; 10) Defining Levels of Accepted Risk; 11) BCPR Integration; 12) BCPR Implementation, Integration, and Validation; 13) BCPR Refinement Schedule; 14) Academy Review; 15) Rating Bioastronautics Risks; 16) Risk Rating Exercises; 17) Human Health Risk Assessment Criteria (examples); 18) A Recent Risk Rating Exercise; 19) Consensus Workshop Background; 20) Consensus Workshop Rating Analysis; 21) Consensus Workshop Selected Preliminary Recommendations; and 22) Access to BCPR Content.
75 FR 56526 - Environmental Management Site-Specific Advisory Board, Portsmouth
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Initiative Workshop of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...
Watershed Management Optimization Support Tool (WMOST) Workshop.
EPA's Watershed Management Optimization Support Tool (WMOST) version 2 is a decision support tool designed to facilitate integrated water management by communities at the small watershed scale. WMOST allows users to look across management options in stormwater (including green i...
Testing the Extensional Detachment Paradigm: A Borehole Observatory in the Sevier Desert Basin, Utah
NASA Astrophysics Data System (ADS)
Christie-Blick, N.; Wernicke, B. P.
2007-12-01
The Sevier Desert basin, Utah represents a world-class target for scientific drilling and for the development of an in situ borehole observatory of active faulting, with potential for establishing that normal-sense slip can occur along a brittle low-angle fault and, by determining the conditions under which that may take place, for resolving the mechanical paradox associated with such structures. The Sevier Desert detachment was defined in the mid- 1970s on the basis seismic reflection data and commercial wells as the contact between Paleozoic carbonate rocks and Cenozoic basin fill over a depth range of ~0-4 km. Today, the interpreted fault is thought by most workers to root into the crust to the west, to have large estimated offset (< 47 km), to have been active over most of its history near its present 11° dip, and to be associated with contemporary surface extension (a 30- km-long zone of prominent Holocene fault scarps immediately west of Clear Lake). Although no seismicity has been documented on the detachment, its scale is consistent with earthquake magnitudes as large as M 7.0. A published alternative interpretation of the Paleozoic-Cenozoic contact as an unconformity rather than a fault has not been generally accepted. Deformation at detachment faults is commonly spatially restricted, and may have been missed in well cuttings. Exhumation of the detachment would have made it possible to remove critical footwall evidence prior to later sedimentary onlap, particularly at updip locations. The incomplete coverage and uneven quality of seismic reflection data on which the detachment interpretation depends, and an unresolved debate about stratigraphic ties to a critical well, leave room for discussion about interpretive details, including the possibility that deformation was distributed across several closely spaced faults. An apparent mismatch between stratigraphically based ages and fission-track evidence for the timing of footwall exhumation cannot be resolved with available well data. Drilling is now needed to make in situ measurements at depth, to obtain critical core of fault rocks at a down-dip site where offset should be large, and to establish more clearly the relationship between basin development and displacement along the interpreted fault. A workshop will take place from July 15-18, 2008, in Utah, under the auspices of the International Continental Scientific Drilling Program, to flesh out objectives, strategies and operational details, and to develop a consensus on the location of a drill site.
78 FR 25956 - Gulf of Mexico Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... on Interrelationships between Coral Reef and Fisheries. DATES: The workshop will convene at 1 p.m. on... INFORMATION: The workshop on Interrelationships between Coral Reefs and Fisheries will examine topics related.... Presentations will include information on distribution and diversity of coral reefs and associated fisheries...
REPORT OF THE 1995 WORKSHOP ON GEOSYNTHETIC CLAY LINERS
A workshop was held at the EPA's National Risk Management Research Laboratory in Cincinnati, Ohio, on August 9 and 10, 1995. On August 9, attendees were shown field plots of GCLs that have been constructed at a site in Cincinnati, and given a detailed account of the test plot la...
Strategies for Coping with Stress and Chronic Pain.
ERIC Educational Resources Information Center
Meyer, Genevieve Rogge
This guide presents strategies used in Pain Management and Stress Reduction workshops for helping the elderly cope with stress and chronic pain. Client evaluations of the workshops are given along with an analysis of the clients' presenting problems. Coping strategies described include: the relaxation response, imagery, daily logs, journal…
Applied Information Systems Research Program (AISRP) Workshop 3 meeting proceedings
NASA Technical Reports Server (NTRS)
1993-01-01
The third Workshop of the Applied Laboratory Systems Research Program (AISRP) met at the Univeristy of Colorado's Laboratory for Atmospheric and Space Physics in August of 1993. The presentations were organized into four sessions: Artificial Intelligence Techniques; Scientific Visualization; Data Management and Archiving; and Research and Technology.
DOT National Transportation Integrated Search
2008-01-01
During the project period two conferences--1st Symposium and Workshop in Global : Supply Chain (http://www.business.utoledo.edu/scm) at University of Toledo, Toledo, : OH, USA (October 6-7, 2007) and 2nd Symposium and Workshop in Global Supply : Chai...
Attitudes and Experiences of Death Workshop Attendees
ERIC Educational Resources Information Center
Kubler-Ross, Elisabeth; Worden, J. William
1977-01-01
Attendees at workshops and lectures were asked to complete a questionnaire which assessed the following: 1) First death experience, 2) Present conceptualization of death, 3) Anticipated reactions to a personal terminal illness, 4) Resources in managing one's own death, and 5) Difficulties experienced in working with dying persons. (Author)
Agroforestry Systems in Zimbabwe: Promoting Trees in Agriculture.
ERIC Educational Resources Information Center
Vukasin, Helen L., Ed.
Agroforestry has been defined as a sustainable crop management system which combines the production of forest crops with field crops. In June, 1987, an agroforestry workshop took place in Nyanga, Manicaland, Zimbabwe. This document was prepared to share the information presented at this workshop with other non-government organizations around the…
The role of the genus Ceanofhus in western forest ecosystems.
Annabelle E. Jaramillo; Kermit Cromack; Sharon Rose
1985-01-01
This report was developed from discussions on the role of Ceanothus in western forests that took place at a workshop held November 22-24, 1982, at Oregon State University, Corvallis, Oregon. The workshop provided a forum for discussing research relevant to Ceanothus management. Major topics were autecology and synecology;...
Oldemeyer, John L.; Biggins, Dean E.; Miller, Brian J.; Crete, Ronald
1993-01-01
The workshop featured a review of current knowledge in the biology of prairie dogs in the context of managing black-footed ferret habitat. The review addressed two main components. The first consisted of a series of papers on prairie dog habitat and biology. The second component of the workshop was a summary of the participants' discussion about managing prairie dog complexes. This discussion was based on the previously identified papers and profited from the participants' expertise on the ecology of black-footed ferrets and prairie dogs. The report provides current and comprehensive information about management of habitat for prairie dogs and black-footed ferrets and is a useful guide for agencies and individuals that manage black-footed ferrets.
Abu Akar, Firas; Gonzalez-Rivas, Diego; Fink, Daniel
2016-01-01
In 24 th /03/2016 we organized the first uniportal video-assisted thoracic surgery (VATS) live surgery workshop in Jerusalem at our institution with our special guest Dr. Diego Gonzalez-Rivas, more than 30 participants attended this workshop from Israeli and the Palestinian territories (cardiothoracic and vascular surgeons, general surgeons, anesthesiologists and nurses). During the workshop Dr. Gonzalez operated two complex cases while the first case was an anatomical S1 segmentectomy, the second case (the one which we are reporting in this paper) was bilobectomy of right middle and lower lobes, during this case a profuse bleeding appeared while introducing the stapler in the interlobar fissure, the source of this bleeding was an abnormally located arterial branch, however the bleeding managed perfectly by Dr. Gonzalez-Rivas, although this surgery kept all of us in a state, all the attendees were happy to see the way how this bleeding managed and everybody was satisfied with the final result.
Gonzalez-Rivas, Diego; Fink, Daniel
2016-01-01
In 24th/03/2016 we organized the first uniportal video-assisted thoracic surgery (VATS) live surgery workshop in Jerusalem at our institution with our special guest Dr. Diego Gonzalez-Rivas, more than 30 participants attended this workshop from Israeli and the Palestinian territories (cardiothoracic and vascular surgeons, general surgeons, anesthesiologists and nurses). During the workshop Dr. Gonzalez operated two complex cases while the first case was an anatomical S1 segmentectomy, the second case (the one which we are reporting in this paper) was bilobectomy of right middle and lower lobes, during this case a profuse bleeding appeared while introducing the stapler in the interlobar fissure, the source of this bleeding was an abnormally located arterial branch, however the bleeding managed perfectly by Dr. Gonzalez-Rivas, although this surgery kept all of us in a state, all the attendees were happy to see the way how this bleeding managed and everybody was satisfied with the final result. PMID:29399474
Reinke, Wendy M; Herman, Keith C; Stormont, Melissa; Newcomer, Lori; David, Kimberly
2013-11-01
Many school-based interventions to promote student mental health rely on teachers as implementers. Thus, understanding the interplay between the multiple domains of fidelity to the intervention and intervention support systems such as coaching and teacher implementation of new skills is an important aspect of implementation science. This study describes a systematic process for assessing multiple domains of fidelity. Data from a larger efficacy trial of the Incredible Years Teacher Classroom Management (IY TCM) program are utilized. Data on fidelity to the IY TCM workshop training sessions and onsite weekly coaching indicate that workshop leaders and the IY TCM coach implemented the training and coaching model with adequate adherence. Further, workshop leaders' ratings of engagement were associated with teacher implementation of specific praise, following training on this content. Lastly, the IY TCM coach differentiation of teacher exposure to coaching was evaluated and found to be associated with teacher implementation of classroom management practices and student disruptive behavior.
Fault Tree Analysis as a Planning and Management Tool: A Case Study
ERIC Educational Resources Information Center
Witkin, Belle Ruth
1977-01-01
Fault Tree Analysis is an operations research technique used to analyse the most probable modes of failure in a system, in order to redesign or monitor the system more closely in order to increase its likelihood of success. (Author)
NASA Technical Reports Server (NTRS)
Lee, S. C.; Lollar, Louis F.
1988-01-01
The overall approach currently being taken in the development of AMPERES (Autonomously Managed Power System Extendable Real-time Expert System), a knowledge-based expert system for fault monitoring and diagnosis of space power systems, is discussed. The system architecture, knowledge representation, and fault monitoring and diagnosis strategy are examined. A 'component-centered' approach developed in this project is described. Critical issues requiring further study are identified.
Fault management for the Space Station Freedom control center
NASA Technical Reports Server (NTRS)
Clark, Colin; Jowers, Steven; Mcnenny, Robert; Culbert, Chris; Kirby, Sarah; Lauritsen, Janet
1992-01-01
This paper describes model based reasoning fault isolation in complex systems using automated digraph analysis. It discusses the use of the digraph representation as the paradigm for modeling physical systems and a method for executing these failure models to provide real-time failure analysis. It also discusses the generality, ease of development and maintenance, complexity management, and susceptibility to verification and validation of digraph failure models. It specifically describes how a NASA-developed digraph evaluation tool and an automated process working with that tool can identify failures in a monitored system when supplied with one or more fault indications. This approach is well suited to commercial applications of real-time failure analysis in complex systems because it is both powerful and cost effective.
NASA Technical Reports Server (NTRS)
Lo, Yunnhon; Johnson, Stephen B.; Breckenridge, Jonathan T.
2014-01-01
This paper describes the quantitative application of the theory of System Health Management and its operational subset, Fault Management, to the selection of abort triggers for a human-rated launch vehicle, the United States' National Aeronautics and Space Administration's (NASA) Space Launch System (SLS). The results demonstrate the efficacy of the theory to assess the effectiveness of candidate failure detection and response mechanisms to protect humans from time-critical and severe hazards. The quantitative method was successfully used on the SLS to aid selection of its suite of abort triggers.
NASA Technical Reports Server (NTRS)
Lo, Yunnhon; Johnson, Stephen B.; Breckenridge, Jonathan T.
2014-01-01
This paper describes the quantitative application of the theory of System Health Management and its operational subset, Fault Management, to the selection of Abort Triggers for a human-rated launch vehicle, the United States' National Aeronautics and Space Administration's (NASA) Space Launch System (SLS). The results demonstrate the efficacy of the theory to assess the effectiveness of candidate failure detection and response mechanisms to protect humans from time-critical and severe hazards. The quantitative method was successfully used on the SLS to aid selection of its suite of Abort Triggers.
Cross-scale phenological data integration to benefit resource management and monitoring
Richardson, Andrew D.; Weltzin, Jake F.; Morisette, Jeffrey T.
2017-01-01
Climate change is presenting new challenges for natural resource managers charged with maintaining sustainable ecosystems and landscapes. Phenology, a branch of science dealing with seasonal natural phenomena (bird migration or plant flowering in response to weather changes, for example), bridges the gap between the biosphere and the climate system. Phenological processes operate across scales that span orders of magnitude—from leaf to globe and from days to seasons—making phenology ideally suited to multiscale, multiplatform data integration and delivery of information at spatial and temporal scales suitable to inform resource management decisions.A workshop report: Workshop held June 2016 to investigate opportunities and challenges facing multi-scale, multi-platform integration of phenological data to support natural resource management decision-making.
76 FR 26252 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... Pacific Fishery Management Council (Pacific Council) will convene a Sardine Research Planning Workshop... Magnuson-Stevens Fishery Conservation and Management Act, provided the public has been notified of the...
NASA Astrophysics Data System (ADS)
Fryxell, J. E.; Hams, J.; Barley, M.; Hobart, K.; Ramirez, J.; McGill, S.; Lyzenga, G.
2003-12-01
With funding from the NSF OEDG, we initiated a project to: (1) involve undergraduate students and K-14 teachers to research in geology, and (2) use GPS to monitor deformation across the plate boundary zone in southern California, and to model partitioning on specific faults that account for that deformation in the upper crust. Starting in July 2002, we collected campaign-style GPS data twice a year from 13 sites along a line across the San Andreas and San Jacinto faults near CSUSB. Our field crews have included 43 students and teachers in our three campaigns to date. These include 30 undergraduate and 3 graduate students, 1 middle school and 8 high school teachers, and 1 community college professor. We are also modeling site velocities from the SCEC Crustal Deformation Velocity Map. Our preliminary results are presented in session ED14 at this meeting. Our most recent campaign (June 2003) was expanded to include workshops. As before, the field crews got one day of hands-on training in setup and operation of the geodetic-quality receivers and antennae. In addition, we held a one-day workshop before the campaign on the active tectonics of southern California, elastic rebound theory, and the scientific goals of the project. After the campaign another one-day workshop was held to plot GPS position results from previous campaigns for a station crew members had occupied during the campaign, and to estimate a velocity for that station. Participants also tried modeling SCEC site velocity data from a transect across the San Andreas, San Jacinto and Elsinore faults. Four of the co-authors on this abstract were campaign participants, and have continued to work with faculty on processing our data and on modeling SCEC data. Students (geology and other majors) felt that participation in the campaign stimulated their interest in geology, and that their participation was a worthwhile experience. Most students are interested in participating in upcoming campaigns, and would recommend the program to other students. The ethnicities of the students include: African American (including Jamaican-American) 3; Hispanic 11; Native American 1; Pacific Islander 1; Asian 1; White 16. Over half of the teachers felt that their participation in the project would very much help them to inspire students to become interested in the Earth Sciences, and all said they would recommend this program to other teachers. All of the teachers felt that their participation was a worthwhile experience, and most would like to participate again. The ethnicities of the teachers include: African American 1; Hispanic 1; Asian 1; White 7. These teachers come from schools in which 20-90% of the students are from ethnic groups that are under-represented in the geosciences. The GPS campaigns and workshops successfully involved students and teachers in active research. Almost all of the participants had a positive experience. One-dimensional modeling of geodetic data from transects across the plate boundary allows students to see how well a particular model fits the data, thus providing a good introduction to the modeling process. One student is learning to use Simplex to conduct further modeling. Another student is using Auto-GIPSY to process our GPS data. The K-14 teacher involvement is forging closer ties with their schools and their students, which we anticipate will help unveil geology as a potential career.
Proceedings of the Workshop Management of Southern Forests for NongameBirds
Richard M. DeGraaf; [Technical Coordinator
1978-01-01
This symposium was held to familiarize land managers in the South with the latest research information useful in management of nongame birds on forested lands.Fourteen papers are reproduced in the Proceedings.
Optimal fault-tolerant control strategy of a solid oxide fuel cell system
NASA Astrophysics Data System (ADS)
Wu, Xiaojuan; Gao, Danhui
2017-10-01
For solid oxide fuel cell (SOFC) development, load tracking, heat management, air excess ratio constraint, high efficiency, low cost and fault diagnosis are six key issues. However, no literature studies the control techniques combining optimization and fault diagnosis for the SOFC system. An optimal fault-tolerant control strategy is presented in this paper, which involves four parts: a fault diagnosis module, a switching module, two backup optimizers and a controller loop. The fault diagnosis part is presented to identify the SOFC current fault type, and the switching module is used to select the appropriate backup optimizer based on the diagnosis result. NSGA-II and TOPSIS are employed to design the two backup optimizers under normal and air compressor fault states. PID algorithm is proposed to design the control loop, which includes a power tracking controller, an anode inlet temperature controller, a cathode inlet temperature controller and an air excess ratio controller. The simulation results show the proposed optimal fault-tolerant control method can track the power, temperature and air excess ratio at the desired values, simultaneously achieving the maximum efficiency and the minimum unit cost in the case of SOFC normal and even in the air compressor fault.
NASA Astrophysics Data System (ADS)
Vivoni, E. R.; Mayer, A. S.; Halvorsen, K. E.; Robles-Morua, A.; Kossak, D.
2016-12-01
A series of iterative participatory modeling workshops were held in Sonora, México with the goal of developing water resources management strategies in a water-stressed basin subject to hydro-climatic variability and change. A model of the water resources system, consisting of watershed hydrology, water resources infrastructure, and groundwater models, was developed deliberatively in the workshops, along with scenarios of future climate and development. Participants used the final version of the water resources systems model to select from supply-side and demand-side water resources management strategies. The performance of the strategies was based on the reliability of meeting current and future demands at a daily time scale over a year's period. Pre- and post-workshop surveys were developed and administered. The survey questions focused on evaluation of participants' modeling capacity and the utility and accuracy of the models. The selected water resources strategies and the associated, expected reliability varied widely among participants. Most participants could be clustered into three groups with roughly equal numbers of participants that varied in terms of reliance on expanding infrastructure vs. demand modification; expectations of reliability; and perceptions of social, environmental, and economic impacts. The wide range of strategies chosen and associated reliabilities indicate that there is a substantial degree of uncertainty in how future water resources decisions could be made in the region. The pre- and post-survey results indicate that participants believed their modeling abilities increased and beliefs in the utility of models increased as a result of the workshops
Managing equality and cultural diversity in the health workforce.
Hunt, Beverley
2007-12-01
This article offers practical strategies to managers and others for supporting overseas trained nurses and managing cultural diversity in the health workforce. Widespread nursing shortages have led managers to recruit nurses from overseas, mainly from developing countries. This paper draws on evidence from the Researching Equal Opportunities for Internationally Recruited Nurses and Other Health Professionals study reported elsewhere in this issue, which indicates that overseas trained nurses encountered widespread discriminatory practices including an overuse of complaints and grievances against them. The researchers also found that the overseas trained nurses responded to their experiences by using various personal strategies to resist or re-negotiate and overcome such discriminatory practices. A research workshop was held in June 2005 at the midpoint of the Researching Equal Opportunities for Internationally Recruited Nurses and Other Health Professionals study. Twenty-five participants attended the workshop. They were the Researching Equal Opportunities for Internationally Recruited Nurses and Other Health Professionals study researchers, advisory group members, including the author of this paper and other researchers in the field of migration. The overall aim of the workshop was to share emerging research data from the Researching Equal Opportunities for Internationally Recruited Nurses and Other Health Professionals and related studies. The final session of the workshop on which this paper is based, was facilitated by the author, with the specific aim of asking the participants to discuss and determine the challenges to managers when managing a culturally diverse workforce. The discussion yielded four main themes collated by the author from which a framework of strategies to facilitate equality and cultural diversity management of the healthcare workers may be developed. The four themes are: assumptions and expectations; education and training to include cultural sensitivity, equality and human rights; performance management; and transparent human resource management processes. Managing a racially and culturally diverse workforce is complex and challenging for managers. There are no ready-made tools to show them how to do so. Achieving effective management of a culturally diverse workforce comes from an intrinsic motivation to develop the cultural competence to engage with them. This article, together with others in this special issue, provides a springboard for moving this agenda on. It offers managers a framework of themes, which they can draw on to develop their own best practice for managing racial equality and cultural diversity in the health workforce.
A design approach for ultrareliable real-time systems
NASA Technical Reports Server (NTRS)
Lala, Jaynarayan H.; Harper, Richard E.; Alger, Linda S.
1991-01-01
A design approach developed over the past few years to formalize redundancy management and validation is described. Redundant elements are partitioned into individual fault-containment regions (FCRs). An FCR is a collection of components that operates correctly regardless of any arbitrary logical or electrical fault outside the region. Conversely, a fault in an FCR cannot cause hardware outside the region to fail. The outputs of all channels are required to agree bit-for-bit under no-fault conditions (exact bitwise consensus). Synchronization, input agreement, and input validity conditions are discussed. The Advanced Information Processing System (AIPS), which is a fault-tolerant distributed architecture based on this approach, is described. A brief overview of recent applications of these systems and current research is presented.
NASA Astrophysics Data System (ADS)
Calcagno, Alberto; Yamashiki, Yosuke; Mugetti, Ana
2002-08-01
The La Plata River Basin is one of the largest international river basins in the world, with an area of about 3 million km2. It spreads across five countries (Argentina, Bolivia, Brazil, Paraguay and Uruguay), and its water resources are essential for their economic development. Together with reservoir development, extensive deforestation, intensive agriculture practices and large urban developments took place in the Paraná, Paraguay and Uruguay basins, affecting environmental conditions and raising important issues concerning water resources use and conservation. Therefore, the need to promote participatory and cooperative efforts among water resources stakeholders, as well as the systematic exchange of information and experiences on common regional problems among organizations and experts from throughout the basin who are devoted to water resources use and management, was reported by researchers and managers gathered at the First and Second International Workshops on Regional Approaches for Reservoir Development and Management in the La Plata River Basin (held in 1991 and 1994). As a concrete response to this need, the efforts of a number of organizations from various countries within the basin, with the support of international and national governmental organizations, resulted in the foundation of La Plata River Basin Environmental Research and Management Network (RIGA) in March 2001. This was within the framework of the Third International Workshop, which was precisely one of the short-term activities included in the RIGA Action Plan. During the preparatory processes for the RIGA Network, the presence of Japanese cooperation supporting the La Plata River Basin Workshops through a non-governmental international organization (ILEC) played an important role in stimulating such an organization-based joint approach in the basin. This outcome, although not originally planned, constituted a welcomed byproduct of its main specific interest in the region, which was the establishment of international sustainable management guidelines for lake and reservoir management.
Proceedings of the Mobile Satellite System Architectures and Multiple Access Techniques Workshop
NASA Technical Reports Server (NTRS)
Dessouky, Khaled
1989-01-01
The Mobile Satellite System Architectures and Multiple Access Techniques Workshop served as a forum for the debate of system and network architecture issues. Particular emphasis was on those issues relating to the choice of multiple access technique(s) for the Mobile Satellite Service (MSS). These proceedings contain articles that expand upon the 12 presentations given in the workshop. Contrasting views on Frequency Division Multiple Access (FDMA), Code Division Multiple Access (CDMA), and Time Division Multiple Access (TDMA)-based architectures are presented, and system issues relating to signaling, spacecraft design, and network management constraints are addressed. An overview article that summarizes the issues raised in the numerous discussion periods of the workshop is also included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khan, T.A.; Roecklein, A.K.
1995-03-01
This report contains the papers presented and the discussions that took place at the Third International Workshop on ALARA Implementation at Nuclear Power Plants, held in Hauppauge, Long Island, New York from May 8--11, 1994. The purpose of the workshop was to bring together scientists, engineers, health physicists, regulators, managers and other persons who are involved with occupational dose control and ALARA issues. The countries represented were: Canada, Finland, France, Germany, Japan, Korea, Mexico, the Netherlands, Spain, Sweden, the United Kingdom and the United States. The workshop was organized into twelve sessions and three panel discussions. Individual papers have beenmore » cataloged separately.« less
Halicioglu, Kerem; Ozener, Haluk
2008-01-01
Both seismological and geodynamic research emphasize that the Aegean Region, which comprises the Hellenic Arc, the Greek mainland and Western Turkey is the most seismically active region in Western Eurasia. The convergence of the Eurasian and African lithospheric plates forces a westward motion on the Anatolian plate relative to the Eurasian one. Western Anatolia is a valuable laboratory for Earth Science research because of its complex geological structure. Izmir is a large city in Turkey with a population of about 2.5 million that is at great risk from big earthquakes. Unfortunately, previous geodynamics studies performed in this region are insufficient or cover large areas instead of specific faults. The Tuzla Fault, which is aligned trending NE–SW between the town of Menderes and Cape Doganbey, is an important fault in terms of seismic activity and its proximity to the city of Izmir. This study aims to perform a large scale investigation focusing on the Tuzla Fault and its vicinity for better understanding of the region's tectonics. In order to investigate the crustal deformation along the Tuzla Fault and Izmir Bay, a geodetic network has been designed and optimizations were performed. This paper suggests a schedule for a crustal deformation monitoring study which includes research on the tectonics of the region, network design and optimization strategies, theory and practice of processing. The study is also open for extension in terms of monitoring different types of fault characteristics. A one-dimensional fault model with two parameters – standard strike-slip model of dislocation theory in an elastic half-space – is formulated in order to determine which sites are suitable for the campaign based geodetic GPS measurements. Geodetic results can be used as a background data for disaster management systems. PMID:27873783
Halicioglu, Kerem; Ozener, Haluk
2008-08-19
Both seismological and geodynamic research emphasize that the Aegean Region, which comprises the Hellenic Arc, the Greek mainland and Western Turkey is the most seismically active region in Western Eurasia. The convergence of the Eurasian and African lithospheric plates forces a westward motion on the Anatolian plate relative to the Eurasian one. Western Anatolia is a valuable laboratory for Earth Science research because of its complex geological structure. Izmir is a large city in Turkey with a population of about 2.5 million that is at great risk from big earthquakes. Unfortunately, previous geodynamics studies performed in this region are insufficient or cover large areas instead of specific faults. The Tuzla Fault, which is aligned trending NE-SW between the town of Menderes and Cape Doganbey, is an important fault in terms of seismic activity and its proximity to the city of Izmir. This study aims to perform a large scale investigation focusing on the Tuzla Fault and its vicinity for better understanding of the region's tectonics. In order to investigate the crustal deformation along the Tuzla Fault and Izmir Bay, a geodetic network has been designed and optimizations were performed. This paper suggests a schedule for a crustal deformation monitoring study which includes research on the tectonics of the region, network design and optimization strategies, theory and practice of processing. The study is also open for extension in terms of monitoring different types of fault characteristics. A one-dimensional fault model with two parameters - standard strike-slip model of dislocation theory in an elastic half-space - is formulated in order to determine which sites are suitable for the campaign based geodetic GPS measurements. Geodetic results can be used as a background data for disaster management systems.
78 FR 4131 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... Pacific Fishery Management Council (Pacific Council) will convene a workshop to examine possibilities to improve management strategy concepts and elements currently in use for the Pacific sardine fishery. DATES...
Proceedings of the Alaska forest soil productivity workshop.
C.W. Slaughter; T. Gasbarro
1988-01-01
The Alaska Forest Soil Productivity Workshop addressed (1) the role of soil information for forest management in Alaska; (2) assessment, monitoring, and enhancement of soil productivity; and (3) Alaska research projects involved in studies of productivity of forests and soils. This proceedings includes 27 papers in five categories: agency objectives in monitoring and...
Costs and Financing in Open Schools
ERIC Educational Resources Information Center
Du Vivier, Ed
2008-01-01
These self-instructional resources have their origins in a workshop on the Costs and Financing of Open & Distance Learning which took place from 6-10 August 2007 in Gabarone, Botswana. The workshop was sponsored by the Commonwealth of Learning (COL) with the overall aim of building capacity to plan, negotiate and manage appropriate financial…
Defining Environmental Education. Workshop Resource Manual.
ERIC Educational Resources Information Center
Disinger, John F.; Monroe, Martha C.
This booklet is one in a series of resource manuals to help teacher educators conduct environmental education (EE) teacher workshops or promote EE programs. This unit is an orientation to the field of EE. It offers a definition of EE and some ways to explain its value to educators and environmental managers. The unit explains current and…
Fiscal Officer Training, 1999-2000. Participant's Guide.
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
This guide is intended for use by participants (college fiscal officers, business officers, bursars, loan managers, etc.) in a two-day workshop on Title IV of the reauthorized Higher Education Act. The guide includes copies of the visual displays used in the workshop, space for individual notes, sample forms, sample computer screens, quizzes, and…
The Role of Problem Specification Workshops in Extension: An IPM Example.
ERIC Educational Resources Information Center
Foster, John; And Others
1995-01-01
Of three extension models--top-down technology transfer, farmers-first approach, and participatory research--the latter extends elements of the other two into a more comprehensive analysis of a problem and specification of solution strategies. An Australian integrated pest management (IPM) example illustrates how structured workshops are a useful…
76 FR 72389 - Pacific Fishery Management Council; Public Meetings/Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... hold an online webinar to review and critique its groundfish stock assessment process in 2011. The online Groundfish Stock Assessment Process Review Workshop webinar is open to the public. DATES: The..., 2011 and continue until 5 p.m. or as necessary to complete business for the day. ADDRESSES: To join the...
The Rehabilitation Process for Clients with Specific Learning Disabilities: Trainer's Manual.
ERIC Educational Resources Information Center
Gladden, Bonnie; And Others
This document presents the manual for a training workshop for rehabilitation counselors on the delivery of services to persons with learning disabilities. It describes how counselors are trained in the workshop to: (1) use five criteria to establish eligibility; (2) apply the case management system to the classification of learning disabilities as…
Educational Methods for Deaf-Blind and Severely Handicapped Students, Volume I.
ERIC Educational Resources Information Center
Peak, Orel; And Others
The 17 papers were originally presented at a 1977 series of workshops for personnel serving the deaf-blind and severely handicapped and are organized into the following workshop topics: programing and program development, the senses, cognition, communication, and behavior managment. The papers have the following titles and authors: "Education for…
Proceedings of a Workshop on Community Impact Analysis (Lexington, Kentucky, May 24-26, 1982).
ERIC Educational Resources Information Center
Southern Rural Development Center, Mississippi State, MS.
The Southern Rural Development Center in cooperation with the University of Kentucky sponsored a workshop which brought together extension and research personnel interested in rural economic development concerns (i.e., inadequate water supplies, sewer systems, and schools). The proceedings include "Community Growth Management: The Land-Grant…
Old-growth forests in the Southwest and Rocky Mountain Regions - Proceedings of a workshop
Merrill R. Kaufman; W. H. Moir; Richard L. Bassett
1992-01-01
This paper reviews the science and management of old-growth forests and summarizes discussions among 30 participants at a workshop in Portal, Arizona, March 9-13, 1992. Concepts of old-growth forests - the perceptions, values, definitions, characteristic features, ecological functions, and landscape importance - vary widely. Because concepts are complex,...
Genetics/Silviculture Workshop Proceedings; Wenatchee, WA; August 27-31, 1990
Richard G. Miller; Dennis D. Murphy
1990-01-01
The primary objective of the 1990 Genetics/Silviculture Workshop was to review and discuss the virtues, concerns, and opportunities for applying the five regeneration harvest methods and their variations in forest management. The first two papers discuss population dynamics and the importance of understanding genetic variation. These are followed by the moderator'...
2013 Higher Education Summit/SUS Data Workshop Proceedings. Session: IRM Data Workshop
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2013
2013-01-01
Information Resource Management--State University System of Florida (IRM-SUS) is the primary collector and provider of data concerning state universities that is used to make sound education policy decisions. The office provides technical assistance to those using the information, state and federal reporting support, those supplying information,…
Workshops for the Handicapped; An Annotated Bibliography - No. 6.
ERIC Educational Resources Information Center
Perkins, Dorothy C., Comp.; And Others
An annotated bibliography of workshops for the handicapped covers the literature on work programs for the period July, 1968 through June, 1969. One hundred and fifty four publications were reviewed; the number of articles on administration, management, and planning of facilities and programs has increased since the last edition. (Author/RJ)
A New Kinematic Model for Polymodal Faulting: Implications for Fault Connectivity
NASA Astrophysics Data System (ADS)
Healy, D.; Rizzo, R. E.
2015-12-01
Conjugate, or bimodal, fault patterns dominate the geological literature on shear failure. Based on Anderson's (1905) application of the Mohr-Coulomb failure criterion, these patterns have been interpreted from all tectonic regimes, including normal, strike-slip and thrust (reverse) faulting. However, a fundamental limitation of the Mohr-Coulomb failure criterion - and others that assume faults form parallel to the intermediate principal stress - is that only plane strain can result from slip on the conjugate faults. However, deformation in the Earth is widely accepted as being three-dimensional, with truly triaxial stresses and strains. Polymodal faulting, with three or more sets of faults forming and slipping simultaneously, can generate three-dimensional strains from truly triaxial stresses. Laboratory experiments and outcrop studies have verified the occurrence of the polymodal fault patterns in nature. The connectivity of polymodal fault networks differs significantly from conjugate fault networks, and this presents challenges to our understanding of faulting and an opportunity to improve our understanding of seismic hazards and fluid flow. Polymodal fault patterns will, in general, have more connected nodes in 2D (and more branch lines in 3D) than comparable conjugate (bimodal) patterns. The anisotropy of permeability is therefore expected to be very different in rocks with polymodal fault patterns in comparison to conjugate fault patterns, and this has implications for the development of hydrocarbon reservoirs, the genesis of ore deposits and the management of aquifers. In this contribution, I assess the published evidence and models for polymodal faulting before presenting a novel kinematic model for general triaxial strain in the brittle field.
Hamilton, David B.; Andrews, Austin K.; Auble, Gregor T.; Ellison, Richard A.; Farmer, Adrian H.; Roelle, James E.
1985-01-01
In the early 1960's, the National Aeronautics and Space Administration (NASA) began purchasing 140,000 acres on Merritt Island, Florida, in order to develop a center for space exploration. Most of this land was acquired to provide a safety and security buffer around NASA facilities. NASA, as the managing agency for the Kennedy Space Center (KSC), is responsible for preventing or controlling environmental pollution from the Federal facilities and activities at the Space Center and is committed to use all practicable means to protect and enhance the quality of the surrounding environment. The Merritt Island National Wildlife Refuge was established in 1963 when management authority for undeveloped lands at KSC was transferred to the U.S. Fish and Wildlife Service. In addition to manage for 11 Federally-listed threatened and endangered species and other resident and migratory fish and wildlife populations, the Refuge has comanagement responsibility for 19,000 acres of mosquito control impoundments and 2,500 acres of citrus groves. The Canaveral National Seashore was developed in 1975 when management of a portion of the coastal lands was transferred from NASA to the National Park Service. This multiagency jurisdiction on Merritt Island has resulted in a complex management environment. The modeling workshop described in this report was conducted May 21-25, 1984, at the Kennedy Space Center to: (1) enhance communication among the agencies with management responsibilities on Merritt Island; (2) integrate available information concerning the development, management, and ecology of Merritt Island; and (3) identify key research and monitoring needs associated with the management and use of the island's resources. The workshop was structured around the formulation of a model that would simulate primary management and use activities on Merritt Island and their effects on upland, impoundment, and estuarine vegetation and associated wildlife. The simulation model is composed of four connected submodels. The Uplands submodel calculates changes in acres and structural components of vegetation communities resulting from succession, fire, facilities development, and shuttle launch depositions, as well as the quantity and quality of surface runoff and aquifer input to an impoundment and an estuary. The Impoundment submodel next determines water quality and quantity and changes in vegetation resulting from water level manipulation and prescribed burning. The Estuary submodel than determines water quality parameters and acres of seagrass beds. Finally, the Wildlife submodel calculates habitat suitability indices for key species of interest, based on vegetation conditions in the uplands and impoundments and on several hydrologic parameters. The model represents a hypothetical management unit with 2,500 acres of uplands, a 600-acre impoundment, and a 1,500-acre section of estuary. Two management scenarios were run to analyze model behavior. The scenarios differ in the frequency of shuttle launches and prescribed burning, the extent of facilities development, the amount of land disposed waste material applied, and the nature and timing of impoundment water level control. Early in a model development project, the process of building the model is usually of greater benefit than the model itself. The model building process stimulates interaction among agencies, assists in integrating existing information, and helps identify research needs. These benefits usually accrue even in the absence of real predictive power in the resulting model. Open communication occurs among the Federal, State, and local agencies involved with activities on Merritt Island and the agencies have a cooperative working relationship. The workshop provided an opportunity for all of these agencies to meet at one time and have focused discussions on the key environmental and multiagency resource management issues. The workshop framework helped to integrate information and assumptions from a number of disciplines and agencies. This integration occurred in the computer simulation model and among workshop participants as submodel linkages were developed and scenario results discussed. A number of research needs were identified at the workshop during the model building and testing exercises and associated discussions. These needs were based on the informed judgement of researchers and managers familiar with Merritt Island or similar areas, rather than on a comprehensive literature review of sensitivity analysis of the preliminary model developed at the workshop. Some of the needs can be addressed by interpreting the results of completed studies from similar geographic areas as they relate to Merritt Island, while other will require additional research studies on Merritt Island. Major research needs associated with the Upland submodel include behavior of the near-surface aquifer, factors limiting slash pine regeneration, frequency and effects of natural fire on various cover types, cumulative effects of shuttle launches, and fate in upland soils of nitrogen and phosphorous from land applied waste material. Key Impoundment submodel needs include documentation of vegetation changes in response to altered water depth, salinity, and nutrient concentrations and better specification of the functional characteristics of impoundments as chemical filters. Important information gaps identified in the Estuary submodel include a more complete analysis of factors contributing to phytoplankton abundance, evaluation of sources of turbidity other than phytoplankton, and identification and quantification of factors limiting seagrass distribution. Primary research needs associated with the Wildlife submodel include a survey of breeding habitat, production data, and harvest data for mottled ducks; data on the emigration and immigration of juvenile mullet (and other transient fish) in the impoundment; the contribution of various seagrasses to habitat requirements of sea trout; and the effects of dissolved oxygen on survival of juvenile sea trout. Ideally, the modeling workshop process is iterative in nature. Periods between workshops are used for research, data collection, and model refinement. Each workshop integrates information collected since the last workshop and produces a more credible model that is more useful in evaluating management alternatives. Participants felt that continued application of this process would help provide ongoing integration and communication among agencies and would allow each agency's planning and management activities to be viewed within the context of an overall assessment.
Smith, Matthew Lee; Towne, Samuel D.; Herrera-Venson, Angelica; Cameron, Kathleen; Kulinski, Kristie P.; Lorig, Kate; Horel, Scott A.; Ory, Marcia G.
2017-01-01
Background: Alongside the dramatic increase of older adults in the United States (U.S.), it is projected that the aging population residing in rural areas will continue to grow. As the prevalence of chronic diseases and multiple chronic conditions among adults continues to rise, there is additional need for evidence-based interventions to assist the aging population to improve lifestyle behaviors, and self-manage their chronic conditions. The purpose of this descriptive study was to identify the geospatial dissemination of Chronic Disease Self-Management Education (CDSME) Programs across the U.S. in terms of participants enrolled, workshops delivered, and counties reached. These dissemination characteristics were compared across rurality designations (i.e., metro areas; non-metro areas adjacent to metro areas, and non-metro areas not adjacent to metro areas). Methods: This descriptive study analyzed data from a national repository including efforts from 83 grantees spanning 47 states from December 2009 to December 2016. Counts were tabulated and averages were calculated. Results: CDSME Program workshops were delivered in 56.4% of all U.S. counties one or more times during the study period. Of the counties where a workshop was conducted, 50.5% were delivered in non-metro areas. Of the 300,640 participants enrolled in CDSME Programs, 12% attended workshops in non-metro adjacent areas, and 7% attended workshops in non-metro non-adjacent areas. The majority of workshops were delivered in healthcare organizations, senior centers/Area Agencies on Aging, and residential facilities. On average, participants residing in non-metro areas had better workshop attendance and retention rates compared to participants in metro areas. Conclusions: Findings highlight the established role of traditional organizations/entities within the aging services network, to reach remote areas and serve diverse participants (e.g., senior centers). To facilitate growth in rural areas, technical assistance will be needed. Additional efforts are needed to bolster partnerships (e.g., sharing resources and knowledge), marketing (e.g., tailored material), and regular communication among stakeholders. PMID:28613257
Do Newborns Have More Complications When Mom Has Asthma?
... Center Fellows-in-Training Grants & Awards Program Directors Practice Resources ASTHMA IQ Consultation and Referral Guidelines Practice Management Tips Practice Management Workshop Practice Tools Running ...
Bringing hands-on exploration of air quality technology to the ...
This is an educational presentation to the OAQPS Teachers Workshop on the PM sensor kit and other related air technology educational activities. This workshop for teachers and other educators includes topics, such as: how EPA manages air quality, the environmental health effects and risks of air pollution, climate change, and sustainability solutions and more. Attendees will also build a DYI Sensor kit and explore energy choices and the environment when they play the interactive board game developed by EPA scientists called Generate! This workshop for teachers and other educators includes topics, such as: how EPA manages air quality, the environmental health effects and risks of air pollution, climate change and sustainability and more. Attendees will also build a DYI Sensor kit and explore energy choices and the environment when they play the interactive board game developed by EPA scientists called Generate!
NASA Technical Reports Server (NTRS)
Yarbrough, Katherine
2015-01-01
During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.
1991-03-01
direction of the work unit was changed to focus on exchanging information in the form of a workshop. It was * eyman-Dove, Linda, Waring, Michael R., and...plan should be broad in scope and evolutionary in principle to permit subsequent revisions neces- sary to fit changing conditions." Cost estimates for...began to update guidance to the field offices in the area of recreation and natural resource manage- ment. Times had changed . New water resource
Shi, J; McCallion, P; Ferretti, L A
2017-06-01
The Chronic Disease Self-Management Program (CDSMP) was developed to advance participants' self-care of chronic illness and may be offered to both individuals with chronic conditions and their caregivers. Previous studies of CDSMP have identified multiple resulting health benefits for participants as well as factors associated with participants' completion rates. This study investigated differences on these issues between caregiving and non-caregiving participants. Secondary analysis using regression analysis to predict the outcome. Baseline data were collected directly from adult (over 18 years) participants of CDSMP workshops in New York State from 2012 to 2015 (n = 2685). Multi-level logistic regression analysis was used to compare the difference on completion of workshops (attended four or more of sessions) and contributing factors with the independent variable of whether participants provided care/assistance to a family member or friends with long-term illness or disability. Additional individual-level variables controlled for in the model were age, gender, race/ethnicity, living arrangement, education, the number of chronic conditions and disabilities; as were workshop-level characteristics of class size, language used, workshop leader experience, location urbanity and delivery site type. Participants who provided care to family or friends were 28% more likely to complete the workshop compared with those who did not (odds ratio = 1.279, P < 0.05). Different factors influenced the completion of CDSMP workshop for caregivers and non-caregivers. People who provide care to others appeared to have stronger motivation to complete the workshops with greater benefits. Agencies offering CDSMP should encourage caregivers to attend. Copyright © 2017. Published by Elsevier Ltd.
How Old Is Your Universe?: A Workshop For Middle Grade Science Teachers
NASA Astrophysics Data System (ADS)
Wulff, A. H.; Siewers, F.; Gelderman, R.; Carini, M.; Roberts, J.; Tyler, R.; McGruder, C.
2005-05-01
Recent attempts to revise how evolution is taught in US schools have found fault not just with Darwin's theory of biological evolution but with current scientific theories about the age and evolution of the cosmos. A multidisciplinary team including physicists, astronomers and geologists initiated two workshops to provide clear, easy to implement curriculum material to help middle grade science teachers explain to their students how we know the ages of the earth, stars, our own solar system, and the entire universe. The nature of science was explained, with special attention paid to distinguishing knowledge gained through the scientific method from matters of faith. In-service and pre-service teachers worked together as a team to master the content behind a series of hands-on activities and develop the best strategies for integrating the lesson plans into the classroom. Research scientists collaborated with educators to present the workshop; and after the workshop traveled to the classrooms to work with the teachers to assist in the implementation of the material. These pairings resulted in a diversity of approaches and implementation strategies being discussed and ultimately implemented. During the workshop the teachers were introduced to a series of inquiry-based, hands-on activities designed to integrate thematic content from the life, earth, and physical sciences. Additional resources (various physics lab materials, earth materials kits, posters, CD-ROMs, etc.) and information were provided to allow each teacher to become familiar with the reasons for our belief in an ancient and evolving universe. The chosen lesson plan activities provide just-in-time introduction of background materials integrating math skills and concepts with the process of discovery. The inquiry-based activities emphasize the methods by which scientists study cosmic distances, ages, and evolution. The entire workshop format has been aligned with, and each activity is linked with, National Science Education Standards and AAAS Project 2061 Benchmarks and the resulting units of study are appropriate for a middle school science course. Each workshop ran for four days, divided into two Friday - Saturday meetings spread over two weeks, with the goal of allowing overburdened teachers to devote a substantial amount of total time to this professional development opportunity without imposing too much at any one point in their schedules. The first weekend concentrated on the age of the earth and the basic geologic principles that have shaped its history; the second weekend focused on how to determine cosmological timescales. These multidisciplinary workshops integrated mathematics and the earth and space sciences, in order to address the urgent need to provide public school teachers with a solid understanding of astronomical ages and the nature of cosmic evolution. Hands-on activities were coupled with telescope viewing opportunities and a half-day geological fieldtrip. Participants were given pre-and post-workshop tests and knowledge surveys in order to assess the effectiveness of the workshops. Modifications were made for the second workshop based on evaluation of these surveys. Researchers and pre-service teachers worked with in-service teacher's classes and provided follow-up support for the implementation of workshop materials.
Fault Tolerance Middleware for a Multi-Core System
NASA Technical Reports Server (NTRS)
Some, Raphael R.; Springer, Paul L.; Zima, Hans P.; James, Mark; Wagner, David A.
2012-01-01
Fault Tolerance Middleware (FTM) provides a framework to run on a dedicated core of a multi-core system and handles detection of single-event upsets (SEUs), and the responses to those SEUs, occurring in an application running on multiple cores of the processor. This software was written expressly for a multi-core system and can support different kinds of fault strategies, such as introspection, algorithm-based fault tolerance (ABFT), and triple modular redundancy (TMR). It focuses on providing fault tolerance for the application code, and represents the first step in a plan to eventually include fault tolerance in message passing and the FTM itself. In the multi-core system, the FTM resides on a single, dedicated core, separate from the cores used by the application. This is done in order to isolate the FTM from application faults and to allow it to swap out any application core for a substitute. The structure of the FTM consists of an interface to a fault tolerant strategy module, a responder module, a fault manager module, an error factory, and an error mapper that determines the severity of the error. In the present reference implementation, the only fault tolerant strategy implemented is introspection. The introspection code waits for an application node to send an error notification to it. It then uses the error factory to create an error object, and at this time, a severity level is assigned to the error. The introspection code uses its built-in knowledge base to generate a recommended response to the error. Responses might include ignoring the error, logging it, rolling back the application to a previously saved checkpoint, swapping in a new node to replace a bad one, or restarting the application. The original error and recommended response are passed to the top-level fault manager module, which invokes the response. The responder module also notifies the introspection module of the generated response. This provides additional information to the introspection module that it can use in generating its next response. For example, if the responder triggers an application rollback and errors are still occurring, the introspection module may decide to recommend an application restart.
Report on the RCDS-CDHSRU workshop on developing clinical guidelines/standards of practice.
Leake, J L; Main, P A; Woodward, G L
1996-07-01
Investigators from the Community Dental Health Services Research Unit (CDHSRU) held a workshop to test a model for developing clinical guidelines/standards of practice, which are required under the Regulated Health Professions Legislation. Forty-two individuals from Ontario and Canada, including dentists, representatives of the public, and professionals, participated in the three-day workshop, held under the auspices of the quality assurance committee of the Royal College of Dental Surgeons of Ontario (RCDS). Through direct experience, workshop participants sought to learn each of the steps, as defined by the literature, involved in clinical guideline development. Ultimately, they hoped to recommend steps for RCDS to follow in developing standards of practice. To ensure that a realistic and valid model emerged from the workshop, a real topic, namely the management of smooth surface enamel lesions in permanent teeth, was used to develop and test clinical guidelines. Prior to the workshop, participants were sent literature on one of five aspects of the topic, as well as papers describing the methodology of critically appraising the literature, and partially-completed templates outlining the basic steps to be followed. During the first evening and first morning of the workshop, participants listened to presentations on the development of clinical guidelines, the prevalence of smooth surface lesions, the role of economics in guideline development, and the necessary considerations in writing clinical guidelines. Under the leadership of trained facilitators, they then worked in small groups to write evidence-based recommendations and report them to the other workshop participants for feedback. Using this feedback, they returned to their groups to revise their recommendations and work on the workshop's overall recommendations to the RCDS. The day concluded in the evening, when the workshop facilitators and coordinators met to edit the groups' recommendations into a consistent format for presentation to all participants. On the second morning, the participants attended a plenary session to review the evidence-based recommendations developed by the groups, as well as their overall recommendations on the steps to be followed by the RCDS. Ultimately, workshop participants partially completed the templates and developed preliminary evidence-based recommendations on the management of enamel smooth-surface caries. Based on their experiences, they recommended a seven-step process for the future development of clinical practice guidelines/standards of practice in Ontario. These steps are recommendations only, and are not RCDS policy.
NASA Astrophysics Data System (ADS)
Cooke, M.; Ellsworth, M.; Del Castello, M.; Jakubowyc, K.
2006-05-01
The growth of accretionary wedges along subducting plate margins has inspired generations of sandbox experiments. These experiments typically contract sand layers to simulate the deformation of sedimentary rocks as the wedge grows in width and height. In the absence of erosional processes, the ratio of wedge height to width will remain constant during wedge growth. The growth is accommodated by the successive development of faults in front of the wedge. However, as erosion reduces the slope of the wedge or removes material from portions of the wedge, the internal deformation of the wedge changes and the faulting sequence is altered. Scientists at the University of Massachusetts are researching fault system development within accretionary systems using a work budget approach. Faults slip and grow in order to minimize the work against gravity, internal work and frictional heating due to slip along faults. High school Earth System teachers at the Model Secondary School for the Deaf in Washington, DC have performed sandbox experiments where students document and record the changes in accretionary wedge growth due to erosion. The sandbox was designed to simulate a variety of tectonic situations and to be suitable for use in the classroom. The wide dimensions of the sandbox permit comparison of different erosive patterns along the strike of the wedge. Students can observe and measure the growth of the wedge within side windows and within map view. The data recorded by students can be integrated with numerical models of the UMass scientists to show how erosion reduces work against gravity and frictional heating to facilitate faulting within the wedge. Collaboration between the high school students and geoscientists has been augmented by video-conferences and annual field trip workshops with other high schools for the deaf participating in the SOAR-high partnership. The 6 schools from around the United States involved with the SOAR-high learning community all use sandbox experiments within their earth system classrooms. The sandbox experiments provide a wonderful hands-on opportunity that invigorates learning about geologic deformation.
How to conduct a workshop on medical writing: Tips, advice and experience sharing.
Rathore, Farooq Azam; Mansoor, Sahibzada Nasir
2015-06-01
Medical writing has become an essential skill for anybody in academia and engaged in teaching. Workshops on medical writing are an effective way to teach the essential skills of medical writing to students and faculty members. There is a huge demand for these workshops all around the globe. Usually there is no curriculum of medical writing for the undergraduates or dedicated structured training sessions for the faculty members. One of the authors won an Author AID grant to conduct a series of workshops on medical writing. Eight workshops were conducted in three months, benefitting more than 200 students and faculty staff. We share our experience of holding this successful series of workshops with the aim that it might serve as a guide for researchers and faculty members who are eager to share and transfer their skills and knowledge. We also offer lessons learnt during this educational activity, tips to improve the quality and delivery of the content with limited resources and maximizing the impact. Experienced medical writers need to conduct these workshops to transfer their skills and to facilitate their colleagues and students to become better medical writers. Planning, rehearsal, motivation, resource management, good team work, audience analysis and feedback can make a workshop successful. Well prepared workshop content delivered in an interactive way with a variety of activities makes the workshop an engaging and interesting educational activity.
An Audit of Diabetes Control and Management (ADCM).
Mastura, I; Zanariah, H; Fatanah, I; Feisul Idzwan, M; Wan Shaariah, M Y; Jamaiyah, H; Geeta, A
2008-09-01
Diabetes is a chronic condition that is one of the major causes of illness, disability, and death in Malaysia. Cost in managing diabetes plus indirect cost of lost work, pain, and suffering have all increased. The optimal management of patients with diabetes require the tracking of patients over time to monitor the progression of the disease, compliance with treatment, and preventive care. Diabetes care can be improved by standardizing access to, and improving the use of, clinical information. Access to timely, accurate and well-organized electronic data will improve the quality of care for patients with diabetes. Clinical Research Center convened an expert workshop to forecast how physicians, hospitals and clinics will employ clinical information technology (IT) applications to diabetes care over the next year. Workshop participants included experts from research organizations, government, and the IT vendor. This is a summary of the workshop organised for the purpose of the Audit of Diabetes Control and Management (ADCM) project. We hope to identify the gaps, if any, that exists in delivering diabetes care and to improve the quality of care. In future, we hope to develop an expansion of this project for the Adult Diabetes Registry that will be implemented for the whole country.
An official American Thoracic Society workshop report: the Integrated Care of The COPD Patient.
Nici, Linda; ZuWallack, Richard
2012-03-01
The optimal care of the patient with chronic obstructive pulmonary disease (COPD) requires an individualized, patient-centered approach that recognizes and treats all aspects of the disease, addresses the systemic effects and comorbidities, and integrates medical care among healthcare professionals and across healthcare sectors. In many ways the integration of medical care for COPD is still in its infancy, and its implementation will undoubtedly represent a paradigm shift in our thinking. This article summarizes the proceedings of a workshop, The Integrated Care of the COPD Patient, which was funded by the American Thoracic Society. This workshop included participants who were chosen because of their expertise in the area as well as their firsthand experience with disease management models. Our summary describes the concepts of integrated care and chronic disease management, details specific components of disease management as they may apply to the patient with COPD, and provides several innovative examples of COPD disease management programs originating from different healthcare systems. It became clear from the discussions and review of the literature that more high-quality research in this area is vital. It is our hope that the information presented here provides a "call to arms" in this regard.
,
2008-01-01
Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), one of the four research stations within the USGS Southwest Biological Science Center. On April 10 and 11, 2007, at the behest of Reclamation, the GCMRC convened a workshop with scientific experts to identify one or more scientifically credible, long-term experimental options for Reclamation to consider for the LTEP EIS that would be consistent with the purpose and need for the plan. Workshop participants included government, academic, and private scientists with broad experience in the Colorado River in Grand Canyon and regulated rivers around the world. Resource managers and GCDAMP participants were also present on the second day of the workshop. In advance of the workshop, Reclamation and LTEP EIS cooperating agencies identified 14 core scientific questions. Workshop participants were asked to consider how proposed options would address these questions, which fall primarily into four areas: (1) conservation of endangered humpback chub (Gila cypha) and other high-priority biological resources, (2) conservation of sediment resources, (3) enhancement of recreational resources, and (4) preservation of cultural resources. A secondary objective of the workshop was the evaluation of four long-term experimental options developed by the GCDAMP Science Planning Group (SPG) (appendix B). The flow and nonflow treatments called for in the four experimental options were an important starting point for workshop discussions. At the beginning of the workshop, participants were provided with the final LTEP EIS scoping report prepared by Reclamation. Participants were also advised that Reclamation had committed to ?make every effortEto ensure that a new population of humpback chub is established in the mainstem or one or more of the tributaries within Grand Canyon? in the 1995 Operation of Glen Canyon Dam Final Environmental Impact Statement (U.S. Department of the Interior, 1995). This decision was consistent with the U.S. Fish and Wildlife Service?s 1995 bi
Klecka, Gary M; Muir, Derek C G; Dohmen, Peter; Eisenreich, Steve J; Gobas, Frank A P C; Jones, Kevin C; Mackay, Donald; Tarazona, José V; van Wijk, Dolf
2009-10-01
There is a growing sense of urgency among scientists and environmental policy-makers concerning the need for improving the scientific foundation supporting international regulations for identifying and evaluating persistent, bioaccumulative, and toxic (PBT) substances and persistent organic pollutants (POPs) in the environment. The current national and international regulations define PBTs and POPs in terms of fairly strict criteria that are based on the state of the science in the late 1970s and early 1980s. Since then, an evolution in the state of the science has produced new insights into PBT substances and an array of new methods to identify PBT chemicals. The development of regulatory criteria has not kept up with the rapid development in environmental chemistry and toxicology, and as a result, scientists often find themselves in the situation where guidance on PBT and POPs criteria is limited and, in some respects, out of date. With this background, a Society of Environmental Toxicology and Chemistry (SETAC) Pellston Workshop brought together experts from academia, government, and industry to reach consensus on the significance of advancements in our understanding of the behavior and potential impact of POPs and PBTs in the environment, the current understanding of the state of the science, as well as recommendations for policy-makers to improve and coordinate national and international regulations on this issue. The workshop builds on the outcome of a previous Pellston workshop, held in 1998, which focused on the evaluation of persistence and long-range transport of organic chemicals in the environment, and is linked to other recent Pellston workshops, among them the Tissue Residue Approach for Toxicity Assessment workshop held in 2007. The results of this workshop are conveyed in a series of 9 articles, published in this issue of Integrated Environmental Assessment and Management, and describe the coordination of science, regulation, and management needed to more effectively achieve a common goal of managing chemicals on our planet.
Product quality management based on CNC machine fault prognostics and diagnosis
NASA Astrophysics Data System (ADS)
Kozlov, A. M.; Al-jonid, Kh M.; Kozlov, A. A.; Antar, Sh D.
2018-03-01
This paper presents a new fault classification model and an integrated approach to fault diagnosis which involves the combination of ideas of Neuro-fuzzy Networks (NF), Dynamic Bayesian Networks (DBN) and Particle Filtering (PF) algorithm on a single platform. In the new model, faults are categorized in two aspects, namely first and second degree faults. First degree faults are instantaneous in nature, and second degree faults are evolutional and appear as a developing phenomenon which starts from the initial stage, goes through the development stage and finally ends at the mature stage. These categories of faults have a lifetime which is inversely proportional to a machine tool's life according to the modified version of Taylor’s equation. For fault diagnosis, this framework consists of two phases: the first one is focusing on fault prognosis, which is done online, and the second one is concerned with fault diagnosis which depends on both off-line and on-line modules. In the first phase, a neuro-fuzzy predictor is used to take a decision on whether to embark Conditional Based Maintenance (CBM) or fault diagnosis based on the severity of a fault. The second phase only comes into action when an evolving fault goes beyond a critical threshold limit called a CBM limit for a command to be issued for fault diagnosis. During this phase, DBN and PF techniques are used as an intelligent fault diagnosis system to determine the severity, time and location of the fault. The feasibility of this approach was tested in a simulation environment using the CNC machine as a case study and the results were studied and analyzed.
76 FR 2672 - Caribbean Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... Caribbean Fishery Management Council (Council) in partnership with the Fisheries Leadership and... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... Management of Data Poor Stocks.'' The intent of this workshop is to discuss tools that the region may find...
Family Life Education for Remarriage: Focus on Financial Management.
ERIC Educational Resources Information Center
Lown, Jean M.; And Others
1989-01-01
Reviews literature on family financial management of remarried couples and describes educational workshop on financial management in remarriage. Proposes five premises based on family developmental conceptual framework. Encourages family life educators to include financial management in remarriage education programs and presents outline for…
Study on workshop layout of a motorcycle company based on systematic layout planning (SLP)
NASA Astrophysics Data System (ADS)
Zhou, Kang-Qu; Zhang, Rui-Juan; Wang, Ying-Dong; Wang, Bing-Jie
2010-08-01
The method of SLP has been applied in a motorcycle company's layout planning. In this layout design, the related graphics have been used to illuminate the logistics and non-logistics relationships of every workshop to get the integrated relationships of workshops and preliminary plans. Comparing the two preliminary plans including logistics efficiency, space utilization, management conveniences, etc, an improvement solution is proposed. Through the improvement solution, the productivity has been increased by 18% and the production capacity is able to make 1600 engines each day.
Look good feel better workshops: a "big lift" for women with cancer.
Taggart, Linda R; Ozolins, Laura; Hardie, Heather; Nyhof-Young, Joyce
2009-01-01
Look Good Feel Better (LGFB) aims to help women manage appearance-related side effects of cancer and its treatment. In this pilot study, we assessed the impact of LGFB workshops on self-image, social interactions, perceived social support, and anxiety. We administered scales preworkshop and postworkshop participation. We conducted semistructured telephone interviews following attendance. Statistically and qualitatively, subjects experienced significant improvement in self-image, social interaction, and anxiety. Participant anxiety decreased, but greater social support was anticipated than actually obtained. LGFB workshops increase self-image, improve social interactions, and reduce anxiety.
Government-Sponsored Programs on Structures Technology
NASA Technical Reports Server (NTRS)
Noor, Ahmed K. (Compiler); Malone, John B. (Compiler)
1997-01-01
This document contains the presentations from the joint UVA/AIAA workshops on Government-Sponsored Programs on Structures Technology, held on April 6, 1997 in Kissimmee, Florida and on September 4, 1997 in Hampton, Virginia. Workshop attendees were the Members and Friends of the AIAA Structures Technical Committee. The objectives of the workshops were to: (a) provide a forum for discussion of current government-sponsored programs in the structures area; (b) identify high-potential research areas for future aerospace systems; and (c) initiate suitable interaction mechanisms with the managers of structures programs.
Subject Matter Expert Workshop to Identify Cybersecurity ...
Report In recognition of the growing need to better address cyber risk and cyber management, the U.S. Environmental Protection Agency’s (EPA) National Homeland Security Research Center (NHSRC) held a Subject Matter Expert Workshop to Identify Cybersecurity Research Gaps and Needs of the Nation’s Water and Wastewater Systems Sector on March 30th and 31st, 2016, at the Ronald Reagan Building in Washington, D.C. The workshop was designed to create a forum for subject matter experts (SMEs) to exchange ideas and address important cybersecurity challenges facing the water sector.
Improving Data Mobility & Management for International Cosmology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borrill, Julian; Dart, Eli; Gore, Brooklin
In February 2015 the third workshop in the CrossConnects series, with a focus on Improving Data Mobility & Management for International Cosmology, was held at Lawrence Berkeley National Laboratory. Scientists from fields including astrophysics, cosmology, and astronomy collaborated with experts in computing and networking to outline strategic opportunities for enhancing scientific productivity and effectively managing the ever-increasing scale of scientific data. While each field has unique details which depend on the instruments employed, the type and scale of the data, and the structure of scientific collaborations, several important themes emerged from the workshop discussions. Findings, as well as a setmore » of recommendations, are contained in their respective sections in this report.« less
Model-Based Fault Diagnosis: Performing Root Cause and Impact Analyses in Real Time
NASA Technical Reports Server (NTRS)
Figueroa, Jorge F.; Walker, Mark G.; Kapadia, Ravi; Morris, Jonathan
2012-01-01
Generic, object-oriented fault models, built according to causal-directed graph theory, have been integrated into an overall software architecture dedicated to monitoring and predicting the health of mission- critical systems. Processing over the generic fault models is triggered by event detection logic that is defined according to the specific functional requirements of the system and its components. Once triggered, the fault models provide an automated way for performing both upstream root cause analysis (RCA), and for predicting downstream effects or impact analysis. The methodology has been applied to integrated system health management (ISHM) implementations at NASA SSC's Rocket Engine Test Stands (RETS).
Fault Management Technology Maturation for NASA's Constellation Program
NASA Technical Reports Server (NTRS)
Waterman, Robert D.
2010-01-01
This slide presentation reviews the maturation of fault management technology in preparation for the Constellation Program. There is a review of the Space Shuttle Main Engine (SSME) and a discussion of a couple of incidents with the shuttle main engine and tanking that indicated the necessity for predictive maintenance. Included is a review of the planned Ares I-X Ground Diagnostic Prototype (GDP) and further information about detection and isolation of faults using Testability Engineering and Maintenance System (TEAMS). Another system that being readied for use that detects anomalies, the Inductive Monitoring System (IMS). The IMS automatically learns how the system behaves and alerts operations it the current behavior is anomalous. The comparison of STS-83 and STS-107 (i.e., the Columbia accident) is shown as an example of the anomaly detection capabilities.
Water impoundments for wildlife: a habitat management workshop.
M. Dean Knighton
1985-01-01
Discusses many aspects of managing wildlife water impoundments in the western Great Lakes region. Political and biological justification, where and how to build impoundments, water-level management options, vegetation, water quality, invertebrate populations, and research needs are all considered.
NASA Technical Reports Server (NTRS)
Simon, Donald L.
2010-01-01
Aircraft engine performance trend monitoring and gas path fault diagnostics are closely related technologies that assist operators in managing the health of their gas turbine engine assets. Trend monitoring is the process of monitoring the gradual performance change that an aircraft engine will naturally incur over time due to turbomachinery deterioration, while gas path diagnostics is the process of detecting and isolating the occurrence of any faults impacting engine flow-path performance. Today, performance trend monitoring and gas path fault diagnostic functions are performed by a combination of on-board and off-board strategies. On-board engine control computers contain logic that monitors for anomalous engine operation in real-time. Off-board ground stations are used to conduct fleet-wide engine trend monitoring and fault diagnostics based on data collected from each engine each flight. Continuing advances in avionics are enabling the migration of portions of the ground-based functionality on-board, giving rise to more sophisticated on-board engine health management capabilities. This paper reviews the conventional engine performance trend monitoring and gas path fault diagnostic architecture commonly applied today, and presents a proposed enhanced on-board architecture for future applications. The enhanced architecture gains real-time access to an expanded quantity of engine parameters, and provides advanced on-board model-based estimation capabilities. The benefits of the enhanced architecture include the real-time continuous monitoring of engine health, the early diagnosis of fault conditions, and the estimation of unmeasured engine performance parameters. A future vision to advance the enhanced architecture is also presented and discussed
NASA Astrophysics Data System (ADS)
de Barros, Felipe P. J.; Bolster, Diogo; Sanchez-Vila, Xavier; Nowak, Wolfgang
2011-05-01
Assessing health risk in hydrological systems is an interdisciplinary field. It relies on the expertise in the fields of hydrology and public health and needs powerful translation concepts to provide decision support and policy making. Reliable health risk estimates need to account for the uncertainties and variabilities present in hydrological, physiological, and human behavioral parameters. Despite significant theoretical advancements in stochastic hydrology, there is still a dire need to further propagate these concepts to practical problems and to society in general. Following a recent line of work, we use fault trees to address the task of probabilistic risk analysis and to support related decision and management problems. Fault trees allow us to decompose the assessment of health risk into individual manageable modules, thus tackling a complex system by a structural divide and conquer approach. The complexity within each module can be chosen individually according to data availability, parsimony, relative importance, and stage of analysis. Three differences are highlighted in this paper when compared to previous works: (1) The fault tree proposed here accounts for the uncertainty in both hydrological and health components, (2) system failure within the fault tree is defined in terms of risk being above a threshold value, whereas previous studies that used fault trees used auxiliary events such as exceedance of critical concentration levels, and (3) we introduce a new form of stochastic fault tree that allows us to weaken the assumption of independent subsystems that is required by a classical fault tree approach. We illustrate our concept in a simple groundwater-related setting.
Thorne, Karen M.; Elliott-Fisk, Deborah L.; Freeman, Chase; Bui, Thuy-Vy D.; Powelson, Katherine; Janousek, Christopher; Buffington, Kevin J.; Takekawa, John Y.
2017-01-01
A key challenge for coastal resource managers is to plan and implement climate change adaptation strategies inlight of uncertainties and competing management priorities. In 2014, we held six workshops across estuaries along the Pacific coast of North America with over 150 participants to evaluate resource managers' perceived level of understanding of climate change science, where they obtain information, how they use this knowledge, and their preparedness for incorporating climate change into their management decisions. We found that most resource managers understood the types of climate change impacts likely to occur in their estuaries, but often lacked the scientific information to make decisions and plan effectively. Managers stated that time, money, and staff resources were the largest obstacles in their efforts. Managers identified that they learned most of their information from peers, scientific journals, and the Internet and indicated that sea-level rise was their greatest concern. There was, however, variation in managers' levels of readiness and perceived knowledge within and among workshop locations. The workshops revealed that some regions don't have the information they need or the planning capacity to effectively integrate climate change into their management, with eight out of fifteen site comparisons showing a significant difference between their level of preparedness (F5,26 = 6.852; p = 0.0003), and their willingness to formally plan (F5,26 = 12.84; p = 0.000002). We found that Urban estuaries were significantly different from Mixed Use and Rural estuaries, in having access to information and feeling more prepared to conduct climate change planning and implementation (F2,29 = 17.34; p = 0.00001). To facilitate climate change preparedness more comprehensive integration of science into management decisions is essential.
Fault Management Practice: A Roadmap for Improvement
NASA Technical Reports Server (NTRS)
Fesq, Lorraine M.; Oberhettinger, David
2010-01-01
Autonomous fault management (FM) is critical for deep space and planetary missions where the limited communication opportunities may prevent timely intervention by ground control. Evidence of pervasive architecture, design, and verification/validation problems with NASA FM engineering has been revealed both during technical reviews of spaceflight missions and in flight. These problems include FM design changes required late in the life-cycle, insufficient project insight into the extent of FM testing required, unexpected test results that require resolution, spacecraft operational limitations because certain functions were not tested, and in-flight anomalies and mission failures attributable to fault management. A recent NASA initiative has characterized the FM state-of-practice throughout the spacecraft development community and identified common NASA, DoD, and commercial concerns that can be addressed in the near term through the development of a FM Practitioner's Handbook and the formation of a FM Working Group. Initial efforts will focus on standardizing FM terminology, establishing engineering processes and tools, and training.
Multi-Agent Diagnosis and Control of an Air Revitalization System for Life Support in Space
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Kowing, Jeffrey; Nieten, Joseph; Graham, Jeffrey s.; Schreckenghost, Debra; Bonasso, Pete; Fleming, Land D.; MacMahon, Matt; Thronesbery, Carroll
2000-01-01
An architecture of interoperating agents has been developed to provide control and fault management for advanced life support systems in space. In this adjustable autonomy architecture, software agents coordinate with human agents and provide support in novel fault management situations. This architecture combines the Livingstone model-based mode identification and reconfiguration (MIR) system with the 3T architecture for autonomous flexible command and control. The MIR software agent performs model-based state identification and diagnosis. MIR identifies novel recovery configurations and the set of commands required for the recovery. The AZT procedural executive and the human operator use the diagnoses and recovery recommendations, and provide command sequencing. User interface extensions have been developed to support human monitoring of both AZT and MIR data and activities. This architecture has been demonstrated performing control and fault management for an oxygen production system for air revitalization in space. The software operates in a dynamic simulation testbed.
The 2018 and 2020 Updates of the U.S. National Seismic Hazard Models
NASA Astrophysics Data System (ADS)
Petersen, M. D.
2017-12-01
During 2018 the USGS will update the 2014 National Seismic Hazard Models by incorporating new seismicity models, ground motion models, site factors, fault inputs, and by improving weights to ground motion models using empirical and other data. We will update the earthquake catalog for the U.S. and introduce new rate models. Additional fault data will be used to improve rate estimates on active faults. New ground motion models (GMMs) and site factors for Vs30 have been released by the Pacific Earthquake Engineering Research Center (PEER) and we will consider these in assessing ground motions in craton and extended margin regions of the central and eastern U.S. The USGS will also include basin-depth terms for selected urban areas of the western United States to improve long-period shaking assessments using published depth estimates to 1.0 and 2.5 km/s shear wave velocities. We will produce hazard maps for input into the building codes that span a broad range of periods (0.1 to 5 s) and site classes (shear wave velocity from 2000 m/s to 200 m/s in the upper 30 m of the crust, Vs30). In the 2020 update we plan on including: a new national crustal model that defines basin depths required in the latest GMMs, new 3-D ground motion simulations for several urban areas, new magnitude-area equations, and new fault geodetic and geologic strain rate models. The USGS will also consider including new 3-D ground motion simulations for inclusion in these long-period maps. These new models are being evaluated and will be discussed at one or more regional and topical workshops held at the beginning of 2018.
Pindilli, Emily J.; Crowley, Christian S.L.; Cline, Sarah A.; Good, Anthony J.; Shapiro, Carl D.; Simon, Benjamin M.
2018-04-19
The first U.S. Department of the Interior Economics Workshop was held April 5–7, 2017 in Washington, D.C., to identify, highlight, and better understand needs and opportunities for economic analysis to support the Department of the Interior’s mission. The Economics Workshop, jointly convened by the Department of the Interior Office of Policy Analysis and the U.S. Geological Survey Science and Decisions Center, provided an opportunity for Department of the Interior’s economists to share expertise and experiences and to build collaboration and communication channels across the Department of the Interior.Natural and cultural resource managers face complex questions and often have to balance competing stakeholder interests. Per the mission statement, the Department of the Interior “protects and manages the Nation’s natural resources and cultural heritage; provides scientific and other information about those resources; and honors its trust responsibilities or special commitments to American Indians, Alaska Natives, and affiliated island communities.” Economic analysis is relevant to issues integral to nearly all the land and water management decisions made by the Department of the Interior. More than 80 Department of the Interior economists gathered at the Economics Workshop to share their work, discuss common challenges, and identify approaches to advance the use and contribution of economics at the Department of the Interior.
Characterization of Model-Based Reasoning Strategies for Use in IVHM Architectures
NASA Technical Reports Server (NTRS)
Poll, Scott; Iverson, David; Patterson-Hine, Ann
2003-01-01
Open architectures are gaining popularity for Integrated Vehicle Health Management (IVHM) applications due to the diversity of subsystem health monitoring strategies in use and the need to integrate a variety of techniques at the system health management level. The basic concept of an open architecture suggests that whatever monitoring or reasoning strategy a subsystem wishes to deploy, the system architecture will support the needs of that subsystem and will be capable of transmitting subsystem health status across subsystem boundaries and up to the system level for system-wide fault identification and diagnosis. There is a need to understand the capabilities of various reasoning engines and how they, coupled with intelligent monitoring techniques, can support fault detection and system level fault management. Researchers in IVHM at NASA Ames Research Center are supporting the development of an IVHM system for liquefying-fuel hybrid rockets. In the initial stage of this project, a few readily available reasoning engines were studied to assess candidate technologies for application in next generation launch systems. Three tools representing the spectrum of model-based reasoning approaches, from a quantitative simulation based approach to a graph-based fault propagation technique, were applied to model the behavior of the Hybrid Combustion Facility testbed at Ames. This paper summarizes the characterization of the modeling process for each of the techniques.
Software reliability through fault-avoidance and fault-tolerance
NASA Technical Reports Server (NTRS)
Vouk, Mladen A.; Mcallister, David F.
1992-01-01
Accomplishments in the following research areas are summarized: structure based testing, reliability growth, and design testability with risk evaluation; reliability growth models and software risk management; and evaluation of consensus voting, consensus recovery block, and acceptance voting. Four papers generated during the reporting period are included as appendices.
NASA Astrophysics Data System (ADS)
Mayer, A.; Vivoni, E.; Halvorsen, K.; Robles-Morua, A.; Dana, K.; Che, D.; Mirchi, A.; Kossak, D.; Casteneda, M.
2013-05-01
In this project, we are studying decision-making for water resources management in anticipation of climate change in the Sonora River Basin, Mexico as a case study for the broader arid and semiarid southwestern North America. The goal of the proposed project is to determine whether water resources systems modeling, developed within a participatory framework, can contribute to the building of management strategies in a context of water scarcity, conflicting water uses and highly variable and changing climate conditions. The participatory modeling approach will be conducted through a series of three workshops, designed to encourage substantive participation from a broad range of actors, including representatives from federal and local government agencies, water use sectors, non-governmental organizations, and academics. Participants will guide the design of supply- and demand-side management strategies and selection of climate change and infrastructure management scenarios using state-of-the-art engineering tools. These tools include a water resources systems framework, a spatially-explicit hydrologic model, the use of forecasted climate scenarios under 21st century climate change, and observations obtained from field and satellite sensors. Through the theory of planned behavior, the participatory modeling process will be evaluated to understand if, and to what extent, the engineering tools are useful in the uncertain and politically-complex setting. Pre- and post-workshop surveys will be used in this evaluation. For this contribution, we present the results of the first collaborative modeling workshop that will be held in March 2013, where we will develop the initial modeling framework in collaboration with workshop participants.
Fault Management Techniques in Human Spaceflight Operations
NASA Technical Reports Server (NTRS)
O'Hagan, Brian; Crocker, Alan
2006-01-01
This paper discusses human spaceflight fault management operations. Fault detection and response capabilities available in current US human spaceflight programs Space Shuttle and International Space Station are described while emphasizing system design impacts on operational techniques and constraints. Preflight and inflight processes along with products used to anticipate, mitigate and respond to failures are introduced. Examples of operational products used to support failure responses are presented. Possible improvements in the state of the art, as well as prioritization and success criteria for their implementation are proposed. This paper describes how the architecture of a command and control system impacts operations in areas such as the required fault response times, automated vs. manual fault responses, use of workarounds, etc. The architecture includes the use of redundancy at the system and software function level, software capabilities, use of intelligent or autonomous systems, number and severity of software defects, etc. This in turn drives which Caution and Warning (C&W) events should be annunciated, C&W event classification, operator display designs, crew training, flight control team training, and procedure development. Other factors impacting operations are the complexity of a system, skills needed to understand and operate a system, and the use of commonality vs. optimized solutions for software and responses. Fault detection, annunciation, safing responses, and recovery capabilities are explored using real examples to uncover underlying philosophies and constraints. These factors directly impact operations in that the crew and flight control team need to understand what happened, why it happened, what the system is doing, and what, if any, corrective actions they need to perform. If a fault results in multiple C&W events, or if several faults occur simultaneously, the root cause(s) of the fault(s), as well as their vehicle-wide impacts, must be determined in order to maintain situational awareness. This allows both automated and manual recovery operations to focus on the real cause of the fault(s). An appropriate balance must be struck between correcting the root cause failure and addressing the impacts of that fault on other vehicle components. Lastly, this paper presents a strategy for using lessons learned to improve the software, displays, and procedures in addition to determining what is a candidate for automation. Enabling technologies and techniques are identified to promote system evolution from one that requires manual fault responses to one that uses automation and autonomy where they are most effective. These considerations include the value in correcting software defects in a timely manner, automation of repetitive tasks, making time critical responses autonomous, etc. The paper recommends the appropriate use of intelligent systems to determine the root causes of faults and correctly identify separate unrelated faults.
NASA Astrophysics Data System (ADS)
Wang, S.; Zhang, X. N.; Gao, D. D.; Liu, H. X.; Ye, J.; Li, L. R.
2016-08-01
As the solar photovoltaic (PV) power is applied extensively, more attentions are paid to the maintenance and fault diagnosis of PV power plants. Based on analysis of the structure of PV power station, the global partitioned gradually approximation method is proposed as a fault diagnosis algorithm to determine and locate the fault of PV panels. The PV array is divided into 16x16 blocks and numbered. On the basis of modularly processing of the PV array, the current values of each block are analyzed. The mean current value of each block is used for calculating the fault weigh factor. The fault threshold is defined to determine the fault, and the shade is considered to reduce the probability of misjudgments. A fault diagnosis system is designed and implemented with LabVIEW. And it has some functions including the data realtime display, online check, statistics, real-time prediction and fault diagnosis. Through the data from PV plants, the algorithm is verified. The results show that the fault diagnosis results are accurate, and the system works well. The validity and the possibility of the system are verified by the results as well. The developed system will be benefit for the maintenance and management of large scale PV array.
76 FR 31350 - Public Workshop; Privacy Compliance Basics and 2011 Developments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
... Privacy Act of 1974, as amended, the E-Government Act of 2002, Office of Management and Budget memoranda... telephone 703-235-0780; by facsimile 703-235-0442; or by e-mail at [email protected] . SUPPLEMENTARY INFORMATION... send an e-mail to [email protected] , with ``PRIVComplianceWorkshop'' in the subject line, and your full name...
Scenarios for the Future of Air Quality: Planning and Analysis in an Uncertain World
On November 15 and 16 of 2010, EPA hosted a workshop: The Future of Air Quality: Planning and Analysis in An Uncertain World in Chapel Hill, North Carolina. This workshop was an “outside-of-the-box” thinking exercise, where a small group of EPA staff and managers brainstormed o...
PERT and CPM: Workshop Material.
ERIC Educational Resources Information Center
Burroughs Corp., Detroit, MI.
This is a workbook containing problems in PERT (program evaluation review technique). It is intended to be used in a workshop or classroom to train management personnel in the basic methodology and capability of PERT. This material is not adequate in depth to create an expert in these techniques, but it is felt that the material is adequate to…
A Curriculum to Enhance Decision-Making Skills of Technical Personnel Working in Teams
ERIC Educational Resources Information Center
Raju, P. K.; Sankar, Chetan S.; Xue, Yajiong
2004-01-01
Rapidly changing engineering designs and business scenarios make it essential for engineers and technical personnel to be trained to be effective team players and project managers. This paper reports the experiences gained in developing and implementing a workshop to train engineers at a steel manufacturing plant. The objective of the workshop was…
USDA FS
1974-01-01
Contains 15 papers presented at a Recreation Research Application Workshop held in June 1973 at Marquette, Michigan. Subjects range all the way from the social and esthetic considerations in recreation management through the economic problems to questions of design and development of sites.
Teacher's Role: Identifying and Overcoming Sex Bias in Classroom Management. Participant Workbook.
ERIC Educational Resources Information Center
Fair, Martha H.; And Others
This manual was developed for use of participants in 10 workshops that were designed to help teachers to identify and overcome sex and ethnic bias. The workshops provide a framework for consideration of the often subtle ways that bias may be an inherent element in textbooks, instructional materials, and teachers' attitudes and behaviors.…
Partners in Flight: past, present, and future: a government perspective
John G. Rogers; Thomas J. Dwyer; Catrin Martin
1993-01-01
On behalf of the fourteen Federal agencies represented on the Federal Neotropical Migratory Bird Conservation Committee, welcome to this first national workshop on management of neotropical migratory birds. The response and interest in this workshop and Partners in Flight has been tremendous. Your participation this week is evidence of the serious commitment of your...
Training Women in Management: A Continuing Education Workshop Approach.
ERIC Educational Resources Information Center
Dubin, Samuel S.
The number of women occupying managerial positions in the U.S. is relatively small, but it rose 47% from 1,321,000 in 1970 to 1,942,000 in 1976. Circumstances contributing to this rise are enforcement of legal sanctions against discrimination and women's increased educational attainment. This report describes a continuing education workshop series…
ERIC Educational Resources Information Center
National Association of Educational Buyers, Westbury, NY.
In addition to general session addresses and the dialogue at 14 workshops, these proceedings include the treasurer's report and lists of committee members, board of directors, exhibitors, and participants. Workshop topics are: "A Good Manager--From a Personnel View,""Effective Use of Specialized Consultants,""Public Utilities,""Computer…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... workshop for September 9, 2010, to be held at the same time and location, 9 a.m. to 5 p.m., Comfort Inn (UNC Wilmington), 151 South College Road, Wilmington, NC 28403. DATES: The Atlantic Shark... CONTACT: Richard A. Pearson of the Highly Migratory Species Management Division at (727) 824-5399...
Early-Career Professional Development Training for Stakeholder-Relevant, Interdisciplinary Research
NASA Astrophysics Data System (ADS)
Rosendahl, D. H.; Bamzai, A.; Mcpherson, R. A.
2015-12-01
There are many challenges to conducting inter- or multi-disciplinary research because basic research, applied research, management processes, disciplines, and even sub-disciplines have been "siloed" for so long that many research and management professionals find it difficult to communicate common interests and research needs. It is clear that the next generation of researchers must overcome these disciplinary biases and engage in more open dialogue with other disciplines and the management community in order to be better positioned to collaborate, speak a common language, and understand each other's needs. The U.S. Department of the Interior's South Central Climate Science Center recently conducted a professional development workshop for 28 early-career researchers involved in climate-related research across the South-Central U.S. The participants consisted of graduate students, postdocs, and junior faculty representing 17 different natural and social science disciplines and seven Universities/Institutions. The workshop provided the participants with guidance and instruction on how to overcome the identified challenges in conducting "actionable" research and how to better navigate multi-institutional and multi- or inter-disciplinary research. The workshop was comprised of: (1) a series of instructional presentations organized into themed sessions; (2) two keynote addresses to provide a broader perspective; (3) a real-world case study activity; (4) individual and group projects/presentations; and (5) field trips. In addition, we purposely created informal opportunities for participants to network, which met the goal of facilitating interdisciplinary interactions. An overview of the workshop experience will be provided, including a focus on those aspects leading to its ultimate success and recommendations for how to develop and implement a similar early-career workshop for your own purposes.
NASA Astrophysics Data System (ADS)
Hill, T. M.; Beane, R. J.; Macdonald, H.; Manduca, C. A.; Tewksbury, B. J.; Allen-King, R. M.; Yuretich, R.; Richardson, R. M.; Ormand, C. J.
2015-12-01
A vital strategy to educate future geoscientists is to support faculty at the beginning of their careers, thus catalyzing a career-long impact on the early-career faculty and on their future students. New faculty members are at a pivotal stage in their careers as they step from being research-focused graduate students and post-doctoral scholars, under the guidance of advisors, towards launching independent careers as professors. New faculty commonly, and not unexpectedly, feel overwhelmed as they face challenges to establish themselves in a new environment, prepare new courses, begin new research, and develop a network of support. The workshop for Early Career Geoscience Faculty: Teaching, Research, and Managing Your Career has been offered annually in the U.S. since 1999. The workshop is currently offered through the National Association of Geoscience Teachers On the Cutting Edge professional development program with support from the NSF, AGU and GSA. This five-day workshop, with associated web resources, offers guidance for incorporating evidence-based teaching practices, developing a research program, and managing professional responsibilities in balance with personal lives. The workshop design includes plenary and concurrent sessions, individual consultations, and personalized feedback from workshop participants and leaders. Since 1999, more than 850 U.S. faculty have attended the Early Career Geoscience Faculty workshop. Participants span a wide range of geoscience disciplines, and are in faculty positions at two-year colleges, four-year colleges, comprehensive universities and research universities. The percentages of women (~50%) and underrepresented participants (~8%) are higher than in the general geoscience faculty population. Multiple participants each year are starting positions after receiving all or part of their education outside the U.S. Collectively, participants report that they are better prepared to move forward with their careers as a result of the workshop, that they plan to incorporate evidence-based teaching in their classrooms, and that they leave the workshop with a network of support and the resources needed to enable them succeed. http://serc.carleton.edu/NAGTWorkshops/earlycareer
Evaluation of the Earth System CoG Infrastructure in Supporting a Model Intercomparison Project
NASA Astrophysics Data System (ADS)
Wallis, J. C.; Rood, R. B.; Murphy, S.; Cinquini, L.; DeLuca, C.
2013-12-01
Earth System CoG is a web-based collaboration environment that combines data services with metadata and project management services. The environment is particularly suited to support software development and model intercomparison projects. CoG was recently used to support the National Climate Predictions and Projections Platform (NCPP) Quantitative Evaluation of Downscaling (QED-2013) workshop. QED-2013 was a workshop with a community approach for the objective, quantitative evaluation of techniques to downscale climate model predictions and projections. This paper will present a brief introduction to CoG, QED-2013, and findings from an ethnographic evaluation of how CoG supported QED-2013. The QED-2013 workshop focused on real-world application problems drawn from several sectors, and contributed to the informed use of downscaled data. This workshop is a part of a larger effort by NCPP and partner organizations to develop a standardized evaluation framework for local and regional climate information. The main goals of QED-2013 were to a) coordinate efforts for quantitative evaluation, b) develop software infrastructure, c) develop a repository of information, d) develop translational and guidance information, e) identify and engage key user communities, and f) promote collaboration and interoperability. CoG was a key player in QED-2013 support. NCPP was an early adopter of the CoG platform, providing valuable recommendations for overall development plus specific workshop-related requirements. New CoG features developed for QED-2013 included: the ability to publish images and associated metadata contained within XML files to its associated data node combine both artifacts into an integrated display. The ability to modify data search facets into scientifically relevant groups and display dynamic lists of workshop participants and their interests was also added to the interface. During the workshop, the QED-2013 project page on CoG provided meeting logistics, meeting materials, shared spaces and resources, and data services. The evaluation of CoG tools was focused on the usability of products rather than metrics, such as number of independent hits to a web site. We wanted to know how well CoG tools supported the workshop participants and their tasks. For instance, what workshop tasks could be performed within the CoG environment? Were these tasks performed there or with alternative tools? And do participants plan to use the tools after the workshop for other projects? Ultimately, we wanted to know if CoG contributed to NCPP's need for a flexible and extensible evaluation platform, and did it support the integration of dispersed resources, quantitative evaluation of climate projections, and the generation and management of interpretive information. Evaluation of the workshop and activity occurred during, at the end of, and after the workshop. During the workshop, an ethnographer observed and participated in the workshop, and collected short, semi-structured interviews with a subset of the participants. At the end of the workshop, an exit survey was administered to all the participants. After the workshop, a variety of methods were used to capture the impact of the workshop.
Why some family planning program fail.
1976-04-01
40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting.
Creating a GIS-Based Decision-Support System
NASA Technical Reports Server (NTRS)
Alvarado, Lori; Gates, Ann Q.; Gray, Bob; Reyes, Raul
1998-01-01
Tilting the Balance: Climate Variability and Water Resource Management in the Southwest, a regional conference hosted by the Pan American Center for Environmental Studies, will be held at The University of Texas at El Paso on March 2-4, 1998. The conference is supported through the US Global Change Research Program (USGCRP) established by the President in 1989, and codified by Congress in the Global Change Research Act of 1990. The NASA Mission to Planet Earth program is one of the workshops sponsors. The purpose of the regional workshops is to improve understanding of the consequences of global change. This workshop will be focused on issues along the border and the Rio Grande River and thus will bring together stakeholders from Mexico, California, Texas, New Mexico, Arizona and Colorado representing federal, state, and local governments; universities and laboratories; industry, agricultural and natural resource managers; and non-governmental organizations. This paper discusses the efforts of the NASA PACES center create a GIS-based decision-support system that can be used to facilitate discussion of the complex issues of resource management within the targeted international region.
Holth, Per; Torsheim, Torbjørn; Sheidow, Ashli J; Ogden, Terje; Henggeler, Scott W
2011-01-01
This study was a crosscultural replication of a study that investigated therapist adherence to behavioral interventions as a result of an intensive quality assurance system which was integrated into Multisystemic Therapy. Thirty-three therapists and eight supervisors participated in the study and were block randomized to either an Intensive Quality Assurance or a Workshop Only condition. Twenty-one of these therapists treated 41 cannabis-abusing adolescents and their families. Therapist adherence and youth drug screens were collected during a five-month baseline period prior to the workshop on contingency management and during 12 months post workshop. The results replicated the previous finding that therapist adherence to the cognitive-behavioral interventions, but not to contingency management, showed a strong positive difference in trend in favor of the intensive quality assurance condition. While the clinical impact of such quality assurance may be delayed and remains to be demonstrated, cannabis abstinence increased as a function of time in therapy, and was more likely with stronger therapy adherence to contingency management, but did not differ across quality assurance interventions.
75 FR 8673 - Mid-Atlantic Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... Mid-Atlantic Fishery Management Council (Council) will conduct an educational workshop on catch shares in cooperation with the Fisheries Leadership and Sustainability Forum (FLSF), the Atlantic States...
Managed lanes handbook training : year 2 report of activities.
DOT National Transportation Integrated Search
2009-02-01
This report summarizes the Year 2 activities under Implementation Project 5-4160-01, Managed Lanes : Handbook Training. The overall objective of the project is to develop a 12-hour workshop covering The : Managed Lanes Handbook, and teach the materia...
Kizawa, Yoshiyuki; Yamamoto, Ryo
2017-07-01
Although palliative care is assuming an increasingly important role in patient care, most physicians did not learn to provide palliative care during their medical training. To address these serious deficiencies in physician training in palliative care, government decided to provide basic palliative education program for all practicing cancer doctors as a national policy namely Palliative care Emphasis program on symptom management and Assessment for Continuous medical Education(PEACE). The program was 2-days workshop based on adult learning theory and focusing on symptom management and communication. In this 9 years, 4,888 educational workshop has been held, and 93,250 physicians were trained. In prospective observational study, both knowledges and difficulties practicing palliative care were significantly improved. In 2017, the new palliative care education program will be launched including combined program of e-learning and workshop to provide tailor made education based on learner's readiness and educational needs in palliative care.
The Sixth Omega Laser Facility Users Group Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrasso, R. D.
A capacity gathering of over 100 researchers from 25 universities and laboratories met at the Laboratory for Laser Energetics (LLE) for the Sixth Omega Laser Facility Users Group (OLUG) workshop. The purpose of the 2.5-day workshop was to facilitate communications and exchanges among individual OMEGA users, and between users and the LLE management; to present ongoing and proposed research; to encourage research opportunities and collaborations that could be undertaken at the Omega Laser Facility and in a complementary fashion at other facilities [such as the National Ignition Facility (NIF) or the Laboratoire pour l’Utilisation des Lasers Intenses (LULI)]; to providemore » an opportunity for students, postdoctoral fellows, and young researchers to present their research in an informal setting; and to provide feedback from the users to LLE management about ways to improve and keep the facility and future experimental campaigns at the cutting edge.« less
The Fifth Omega Laser Facility Users Group Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrasso, R. D.
A capacity gathering of over 100 researchers from 25 universities and laboratories met at the Laboratory for Laser Energetics (LLE) for the Fifth Omega Laser Facility Users Group (OLUG) workshop. The purpose of the 2.5-day workshop was to facilitate communications and exchanges among individual Omega users and between users and the LLE management; to present ongoing and proposed research; to encourage research opportunities and collaborations that could be undertaken at the Omega Laser Facility and in a complementary fashion at other facilities [such as the National Ignition Facility (NIF) or the Laboratoire pour l’Utilisation des Lasers Intenses (LULI)]; to providemore » an opportunity for students, postdoctoral fellows, and young researchers to present their research in an informal setting; and to provide feedback to LLE management from the users about ways to improve the facility and future experimental campaigns.« less
Smith, Matthew Lee; Bergeron, Caroline D; Ahn, SangNam; Towne, Samuel D; Mingo, Chivon A; Robinson, Kayin T; Mathis, Jamarcus; Meng, Lu; Ory, Marcia G
2018-01-01
Females are more likely than males to participate in evidence-based health promotion and disease prevention programs targeted for middle-aged and older adults. Despite the availability and benefits of Stanford's Chronic Disease Self-Management Education (CDSME) programs, male participation remains low. This study identifies personal characteristics of males who attended CDSME program workshops and identifies factors associated with successful intervention completion. Data were analyzed from 45,375 male CDSME program participants nationwide. Logistic regression was performed to examine factors associated with workshop attendance. Males who were aged 65-79 (OR = 1.27, p < .001), Hispanic (OR = 1.22, p < .001), African American (OR = 1.13, p < .001), Asian/Pacific Islander (OR = 1.26, p < .001), Native Hawaiian (OR = 3.14, p < .001), and residing in nonmetro areas (OR = 1.26, p < .001) were more likely to complete the intervention. Participants with 3+ chronic conditions were less likely to complete the intervention (OR = 0.87, p < .001). Compared to health-care organization participants, participants who attended workshops at senior centers (OR = 1.38, p < .001), community/multipurpose facilities (OR = 1.21, p < .001), and faith-based organizations (OR = 1.37, p < .001) were more likely to complete the intervention. Men who participated in workshops with more men were more likely to complete the intervention (OR = 2.14, p < .001). Once enrolled, a large proportion of males obtained an adequate intervention dose. Findings highlight potential strategies to retain men in CDSME programs, which include diversifying workshop locations, incorporating Session Zero before CDSME workshops, and using alternative delivery modalities (e.g., online).
Kumar, Arunaz; Nestel, Debra; Stoyles, Sally; East, Christine; Wallace, Euan M; White, Colleen
2016-02-01
Birth at home is a safe and appropriate choice for healthy women with a low risk pregnancy. However there is a small risk of emergencies requiring immediate, skilled management to optimise maternal and neonatal outcomes. We developed and implemented a simulation workshop designed to run in a home based setting to assist with emergency training for midwives and paramedical staff. The workshop was evaluated by assessing participants' satisfaction and response to key learning issues. Midwifery and emergency paramedical staff attending home births participated in a simulation workshop where they were required to manage birth emergencies in real time with limited availability of resources to suit the setting. They completed a pre-test and post-test evaluation form exploring the content and utility of the workshops. Content analysis was performed on qualitative data regarding the most important learning from the simulation activity. A total of 73 participants attended the workshop (midwifery=46, and paramedical=27). There were 110 comments, made by 49 participants. The most frequently identified key learning elements were related to communication (among midwives, paramedical and hospital staff and with the woman's partner), followed by recognising the role of other health care professionals, developing an understanding of the process and the importance of planning ahead. Home birth simulation workshop was found to be a useful tool by staff that provide care to women who are having a planned home birth. Developing clear communication and teamwork were found to be the key learning principles guiding their practice. Copyright © 2015 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.
Donohue, Brad; Conway, Debbie; Beisecker, Monica; Murphy, Heather; Farley, Alisha; Waite, Melissa; Gugino, Kristin; Knatz, Danielle; Lopez-Frank, Carolina; Burns, Jack; Madison, Suzanne; Shorty, Carrie
2005-07-01
Ninety-two adolescents, predominantly ethnic minority high school students, participated in a structured Summer Business Institute (SBI). Participating youth were randomly assigned to receive either job social skills or financial management skills training components. Students who additionally received the job social skills training component were more likely to recommend their employment agency to others than were youth who received the financial management component, rated their overall on-the-job work experience more favorably, and demonstrated higher scores in areas that were relevant to the skills that were taught in the job social skills workshops. The financial management component also appeared to be relatively effective, as youth who received this intervention improved their knowledge of financial management issues more than youth who received job social skills, and rated their workshops as more helpful in financial management, as well as insurance management. Future directions are discussed in light of these results.
Army Management Views: Report of the 4th Biennial Management Instructors' Seminar July 21-26, 1968.
ERIC Educational Resources Information Center
Hancock, Chester H.; And Others
The report of the Fourth Biennial Management Instructors' Seminar (July 21-26, 1968) which deals with the improvement of management education in the Army, contains presentations of guest speakers and reports of seminar workshops. The former presents the components of management -- planning, decision-making, productivity, communication, and…
NASA Astrophysics Data System (ADS)
Searle, M. P.; Phillips, R. J.
2003-12-01
Total geological offset of 1000 km along the dextral Karakoram fault (Peltzer & Tapponnier 1989) were based on incorrect correlation of granite belts from the Pamir to S. Tibet and active slip rates of 30mm/yr-1 were based on an assumption of the age of offset post-glacial features (10 +/- 2 ka; Liu et al. 1992). Detailed mapping and U-Pb and 40Ar/39Ar geochronology has confirmed that total dextral offsets are less than 120 km, the timing of initiation of the fault must have been younger than 15 Ma and that exhumation of sheared leucogranites and migmatites occurred between 15-11 Ma (Searle et al., 1997; Dunlap et al., 1998). We stress that: 1. All Tibetan fault slip rates published prior to 1996 are invalid as no precise timing constraints on the post-glacial Quaternary features were used. The common assumption was that all glacial features were formed 10 +/- 2 ka, without any absolute dating. The glacial and fluvial features used to constrain offsets could have been awry by a factor of 3 or 4 (from 3.5 Ma - 20,000 ka). 2. Recent slip rates derived from cosmogenic isotope dating of offset Quaternary features should be treated with immense caution because during the continual recycling process of glacial moraine or alluvial fan burial, exposure and re-deposition, it cannot be known precisely which phase of exhumation is being dated. 3. Long-term geological slip rates on offset granites, precisely constrained by U-Pb geochronology remain the best estimates of timing of initiation, total finite offset and slip rates on Tibetan strike-slip faults. 4. The Karakoram fault is unlikely to be a lithospheric scale fault, because (a) temperatures beneath the southern part of the Tibetan plateau and beneath the faults are high enough to induce melting (>700° C at only 20 km depth), and (b) the lower crust beneath these faults must be underplated cold, old granulite facies crust of the Indian shield. 5. There appears to be a distinct lack of seismicity located along the Karakoram fault today. GPS data suggest that right-lateral slip parallel to the Karakoram fault occurred at 3.4 +/- 5 mm/yr (Gaur 2002). If this figure is meaningful, then the slip today must be taken up mainly by aseismic creep, which suggests high temperatures occur at shallow depths along the fault, consistent with continuous but sporadic, and very young high-temperature metamorphism and anatexis in the southern Karakoram (Fraser et al. 2001). References cited: Dunlap, W.J., Weinberg, R.F. & Searle, M.P. 1998. J. Geol. Soc. London, 155, 903-12. Fraser, J.E., Searle, M.P., Parrish, R.R. & Noble, S.R. 2001. Bull. Geol. Soc. America, 113, 1443-55. Gaur, V. 2002. Abstract, 17th Himalaya-Karakoram-Tibet Workshop, Sikkim. Peltzer, G., Tapponnier, P. 1988. J. Geophysical Research, 93, 15058-117. Searle, M.P., Weinberg, R.F. & Dunlap, W.J. 1998. In: Continental Transpressional and Transtensional Tectonics. Geol. Soc. London Spec. Pub. 135, 307-26.
Seismic and tsunami hazard in Puerto Rico and the Virgin Islands
Dillon, William P.; Frankel, Arthur D.; Mueller, Charles S.; Rodriguez, Rafael W.; ten Brink, Uri S.
1999-01-01
Executive SummaryPuerto Rico and the Virgin Islands are located at an active plate boundary between the North American plate and the northeast corner of the Caribbean plate. The region was subject in historical times to large magnitude earthquakes and devastating tsunamis. A major downward tilt of the sea floor north of Puerto Rico and the Virgin Islands, large submarine rockslides, and an unusually large negative gravity anomaly are also indicative of a tectonically active region. Scientists have so far failed to explain the deformation of this region in a coherent and predictable picture, such as in California, and this has hampered their ability to assess seismic and tsunami hazards in the region. The NE corner of the Caribbean is unique among the seismically-active regions of the United States in that it is mostly covered by water. This fact presents an additional challenge for seismic and tsunami hazard assessment and mitigation.The workshop, convened in San Juan on March 23-24, 1999, was "historic" in that it brought together for the first time a broad spectrum of scientists, engineers, and public and private sector officials who deal with such diverse questions as tectonic models, probabilistic assessment of seismic hazard, prediction of tsunami runup, strong ground motion, building codes, stability of man-made structures, and the public’s preparedness for natural disasters. It was an opportunity for all the participants to find out how their own activity fit into the broad picture of science and how it aids society in hazard assessment and mitigation. In addition, the workshop was offered as a continuing education course at the Colegio de Ingenieros y Agrimensores de Puerto Rico, which assured a rapid dissemination of the results to the local community. A news conference which took place during the workshop alerted the public to the efforts of the USGS, other Federal agencies, the Commonwealth of Puerto Rico, universities and the private sector.During the first day of the workshop, participants from universities, federal institutions, and consulting firms in Puerto Rico, the Virgin Islands, the continental U.S., Dominican Republic, and Europe reviewed the present state of knowledge including a review and discussion of present plate models, recent GPS and seismic reflection data, seismicity, paleoseismology, and tsunamis. The state of earthquake/tsunami studies in Puerto Rico was presented by several faculty members from the University of Puerto Rico at Mayaguez. A preliminary seismic hazard map was presented by the USGS and previous hazard maps and economic loss assessments were considered. During the second day, the participants divided into working groups and prepared specific recommendations for future activities in the region along the six following topics below. Highlights of these recommended activities are:Marine geology and geophysics – Acquire deep-penetration seismic reflection and refraction data, deploy temporary ocean bottom seismometer arrays to record earthquakes, collect high-resolution multibeam bathymetry and side scan sonar data of the region, and in particular, the near shore region, and conduct focussed high-resolution seismic studies around faults. Determine slip rates of specific offshore faults. Assemble a GIS database for available marine geological and geophysical data.Paleoseismology and active faults - Field reconnaissance aimed at identifying Quaternary faults and determining their paleoseismic chronology and slip rates, as well as identifying and dating paleoliquefaction features from large earthquakes. Quaternary mapping of marine terraces, fluvial terraces and basins, beach ridges, etc., to establish framework for understanding neotectonic deformation of the island. Interpretation of aerial photography to identify possible Quaternary faults.Earthquake seismology – Determine an empirical seismic attenuation function using observations from local seismic networks and recently-installed broad-band stations. Evaluate existing earthquake catalogs from local networks and regional stations, complete the catalogs. Transcribe the pre-1991 network data from 9-track tape onto more stable archival media. Calibrate instruments of local networks. Use GPS measurement to constrain deformation rates used in seismic-hazard maps.Engineering – Prepare liquefaction susceptibility maps for the urban areas. Update and improve databases for types of site conditions. Collect site effect observations and near-surface geophysical measurements for future local (urban-area) hazard maps. Expand the number of instruments in the strong motion program. Develop fragility curves for Puerto Rico construction types and details, and carry out laboratory testing on selected types of mass-produced construction. Consider tsunami design in shoreline construction projects.Tsunami hazard - Extract tsunami observations from archives and develop a Caribbean historical tsunami database. Analyze prehistoric tsunami deposits. Collect accurate, up-to-date, near-shore topography and bathymetry for accurate inundation models. Prepare tsunami flooding and evacuation maps. Establish a Caribbean Tsunami Warning System for Puerto Rico and the Virgin Islands. Evaluate local, regional, national, and global seismic networks and equipment, and their role in a tsunami warning system.Societal concerns – Prepare warning messages, protocols, and evacuation routes for earthquake, tsunami, and landslide hazards for Puerto Rico and the U.S. Virgin Islands. Advocate enforcement of existing building codes. Prepare non-technical hazard assessment maps for political and educational uses. Raise the awareness of potentially affected populations by presentations at elementary schools, by the production of a tsunami video, and by distribution of earthquake preparedness manuals in newspaper supplements. Promote partnerships at state and federal level for long-term earthquake and tsunami hazard mitigation. This partnership should also include the private sector such as the insurance industry, telecommunication companies, and the engineering community.The following reports of the various working groups are the cumulative recommendations of the community of scientists, engineers, and public officials, who participated in the workshop. The list of participants and the workshop’s agenda are given in the appendix.Marine and Geology and Geophysics Working GroupPaleoseismology and Active Faults Working GroupJoint Working Group for Earthquake Seismology and EngineeringTsunami Working GroupSocietal Concerns Working Group
A Handbook for Classroom Management that Works
ERIC Educational Resources Information Center
Marzano, Robert J.; Gaddy, Barbara B.; Foseid, Maria C.; Foseid, Mark P.; Marzano, Jana S.
2005-01-01
Use this handbook in self-help, study group, and teacher workshop situations to implement the research-based classroom management practices from the ASCD best-seller "Classroom Management That Works". The authors guide you through the classroom management approaches that support higher student achievement and provide you with hundreds of…
National Weather- RFC Development Management
Map News Organization Search NWS ALL NOAA Go RFC Development Management Presentations Projects & ; Plans RFC Development Program RFC Archive Database Documentation Outline Workshops Contact Us resources and services. Description Graphic The RFC Development Management component of the Office of
75 FR 65298 - Gulf of Mexico Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... Mexico Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of a public meeting. SUMMARY: The Gulf of Mexico Fishery Management Council will convene a sector separation workshop. DATES...
Northeastern Forest Experiment Station
1997-01-01
Contains 32 articles on communicating the values and benefits of silviculture in managing the national forests. Specific topics addressed are how communications affect: policymakers, inventory and monitoring, resource management, research, education and demonstration, and partnerships.
Simulation of demand-response power management in smart city
NASA Astrophysics Data System (ADS)
Kadam, Kshitija
Smart Grids manage energy efficiently through intelligent monitoring and control of all the components connected to the electrical grid. Advanced digital technology, combined with sensors and power electronics, can greatly improve transmission line efficiency. This thesis proposed a model of a deregulated grid which supplied power to diverse set of consumers and allowed them to participate in decision making process through two-way communication. The deregulated market encourages competition at the generation and distribution levels through communication with the central system operator. A software platform was developed and executed to manage the communication, as well for energy management of the overall system. It also demonstrated self-healing property of the system in case a fault occurs, resulting in an outage. The system not only recovered from the fault but managed to do so in a short time with no/minimum human involvement.
A structural model decomposition framework for systems health management
NASA Astrophysics Data System (ADS)
Roychoudhury, I.; Daigle, M.; Bregon, A.; Pulido, B.
Systems health management (SHM) is an important set of technologies aimed at increasing system safety and reliability by detecting, isolating, and identifying faults; and predicting when the system reaches end of life (EOL), so that appropriate fault mitigation and recovery actions can be taken. Model-based SHM approaches typically make use of global, monolithic system models for online analysis, which results in a loss of scalability and efficiency for large-scale systems. Improvement in scalability and efficiency can be achieved by decomposing the system model into smaller local submodels and operating on these submodels instead. In this paper, the global system model is analyzed offline and structurally decomposed into local submodels. We define a common model decomposition framework for extracting submodels from the global model. This framework is then used to develop algorithms for solving model decomposition problems for the design of three separate SHM technologies, namely, estimation (which is useful for fault detection and identification), fault isolation, and EOL prediction. We solve these model decomposition problems using a three-tank system as a case study.
Fault detection and multiclassifier fusion for unmanned aerial vehicles (UAVs)
NASA Astrophysics Data System (ADS)
Yan, Weizhong
2001-03-01
UAVs demand more accurate fault accommodation for their mission manager and vehicle control system in order to achieve a reliability level that is comparable to that of a pilot aircraft. This paper attempts to apply multi-classifier fusion techniques to achieve the necessary performance of the fault detection function for the Lockheed Martin Skunk Works (LMSW) UAV Mission Manager. Three different classifiers that meet the design requirements of the fault detection of the UAAV are employed. The binary decision outputs from the classifiers are then aggregated using three different classifier fusion schemes, namely, majority vote, weighted majority vote, and Naieve Bayes combination. All of the three schemes are simple and need no retraining. The three fusion schemes (except the majority vote that gives an average performance of the three classifiers) show the classification performance that is better than or equal to that of the best individual. The unavoidable correlation between the classifiers with binary outputs is observed in this study. We conclude that it is the correlation between the classifiers that limits the fusion schemes to achieve an even better performance.
A Structural Model Decomposition Framework for Systems Health Management
NASA Technical Reports Server (NTRS)
Roychoudhury, Indranil; Daigle, Matthew J.; Bregon, Anibal; Pulido, Belamino
2013-01-01
Systems health management (SHM) is an important set of technologies aimed at increasing system safety and reliability by detecting, isolating, and identifying faults; and predicting when the system reaches end of life (EOL), so that appropriate fault mitigation and recovery actions can be taken. Model-based SHM approaches typically make use of global, monolithic system models for online analysis, which results in a loss of scalability and efficiency for large-scale systems. Improvement in scalability and efficiency can be achieved by decomposing the system model into smaller local submodels and operating on these submodels instead. In this paper, the global system model is analyzed offline and structurally decomposed into local submodels. We define a common model decomposition framework for extracting submodels from the global model. This framework is then used to develop algorithms for solving model decomposition problems for the design of three separate SHM technologies, namely, estimation (which is useful for fault detection and identification), fault isolation, and EOL prediction. We solve these model decomposition problems using a three-tank system as a case study.
The Orbital Workshop Waste Management Compartment
NASA Technical Reports Server (NTRS)
1972-01-01
This image is a wide-angle view of the Orbital Workshop waste management compartment. The waste management facilities presented a unique challenge to spacecraft designers. In addition to collection of liquid and solid human wastes, there was a medical requirement to dry all solid human waste products and to return the residue to Earth for examination. Liquid human waste (urine) was frozen for return to Earth. Total quantities of each astronaut's liquid and solid wastes were precisely measured. Cabin air was drawn into the toilet, shown on the wall at right in this photograph, and over the waste products to generate a flow of the waste in the desired direction. The air was then filtered for odor control and antiseptic purposes prior to being discharged back into the cabin.
Workshop proceedings: research and management in whitebark pine ecosystems
Kendall, Katherine C.; Coen, Brenda
1994-01-01
The purpose of this workshop is to exchange information on on-going and soon-to-be-initiated whitebark pine research and management projects. By doing so we hope to encourage future work on this valuable species. We also hope to promote the use of consistent methods for evaluation and investigation of whitebark pine, and to provide avenues of collaboration. Speakers will present information on a variety of topics related to whitebark pine management and research. Featured presentation topics include anthropomorphic utilization of whitepark pine forests, whitebark pine natural regeneration, blister rust and the decline of whitebark pine, blister rust resistance studies, ecological mapping of the species, restoration and management projects, and survey/monitoring techniques. Information gained from these presentations may hopefully be used in the planning of future projects for the conservation of whitebark pine.
Using role analysis to plan for stakeholder involvement: a Wyoming case study
Burkardt, Nina; Ponds, Phadrea D.
2006-01-01
Prior to implementing laws and policies regulating water, wildlife, wetlands, endangered species, and recreation, natural resource managers often solicit public input. Concomitantly, managers are continually seeking more effective ways to involve stakeholders. In the autumn of 1999, the Wyoming Game and Fish Department sought to develop a state management plan for its portion of the Yellowstone grizzly bear (Ursus arctos horribilis) population if it was removed from the federal threatened species list. A key aspect of developing this plan was the involvement of federal, state, and local agencies, representatives from nongovernmental organizations, and citizens. Wyoming wildlife managers asked researchers from the United States Geological Survey to demonstrate how the Legal-Institutional Analysis Model could be used to initiate this process. To address these needs, we conducted similar workshops for a group of state and federal managers or staffers and a broad group of stakeholders. Although we found similarities among the workshop groups, we also recorded differences in perspective between stakeholder groups. The managers group acknowledged the importance of varied stakeholders but viewed the grizzly bear planning process as one centered on state interests, influenced by state policies, and amenable to negotiation. The other workshops identified many stakeholders and viewed the decision process as diffuse, with many opportunities for entry into the process. These latter groups were less certain about the chance for a successful negotiation. We concluded that if these assumptions and differences were not reconciled, the public involvement effort was not likely to succeed.