Interim reliability evaluation program, Browns Ferry fault trees
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, M.E.
1981-01-01
An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less
The development of an interim generalized gate logic software simulator
NASA Technical Reports Server (NTRS)
Mcgough, J. G.; Nemeroff, S.
1985-01-01
A proof-of-concept computer program called IGGLOSS (Interim Generalized Gate Logic Software Simulator) was developed and is discussed. The simulator engine was designed to perform stochastic estimation of self test coverage (fault-detection latency times) of digital computers or systems. A major attribute of the IGGLOSS is its high-speed simulation: 9.5 x 1,000,000 gates/cpu sec for nonfaulted circuits and 4.4 x 1,000,000 gates/cpu sec for faulted circuits on a VAX 11/780 host computer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham
The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, andmore » Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal
The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned bymore » Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.« less
Interim reliability evaluation program, Browns Ferry 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1981-01-01
Probabilistic risk analysis techniques, i.e., event tree and fault tree analysis, were utilized to provide a risk assessment of the Browns Ferry Nuclear Plant Unit 1. Browns Ferry 1 is a General Electric boiling water reactor of the BWR 4 product line with a Mark 1 (drywell and torus) containment. Within the guidelines of the IREP Procedure and Schedule Guide, dominant accident sequences that contribute to public health and safety risks were identified and grouped according to release categories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
A probabilistic risk assessment (PRA) was made of the Browns Ferry, Unit 1, nuclear plant as part of the Nuclear Regulatory Commission's Interim Reliability Evaluation Program (IREP). Specific goals of the study were to identify the dominant contributors to core melt, develop a foundation for more extensive use of PRA methods, expand the cadre of experienced PRA practitioners, and apply procedures for extension of IREP analyses to other domestic light water reactors. Event tree and fault tree analyses were used to estimate the frequency of accident sequences initiated by transients and loss of coolant accidents. External events such as floods,more » fires, earthquakes, and sabotage were beyond the scope of this study and were, therefore, excluded. From these sequences, the dominant contributors to probable core melt frequency were chosen. Uncertainty and sensitivity analyses were performed on these sequences to better understand the limitations associated with the estimated sequence frequencies. Dominant sequences were grouped according to common containment failure modes and corresponding release categories on the basis of comparison with analyses of similar designs rather than on the basis of detailed plant-specific calculations.« less
Experimental installation of permeable base first interim report.
DOT National Transportation Integrated Search
2007-08-01
The effects of excessive water within pavement structural sections has been shown to decrease the service : life of our nations roadways. Some of the problems associated with this excessive water include : premature rutting, cracking, faulting, in...
Carter, Mark W.; Merschat, Arthur J.
2014-01-01
The contact between eastern Blue Ridge stratified rocks above Mesoproterozoic basement rocks is mostly faulted (Gossan Lead and Red Valley). The Callaway fault juxtaposes Ashe and Lynchburg rocks above Wills Ridge Formation. Alligator Back Formation rocks overlie Ashe and Lynchburg rocks along the Rock Castle Creek fault, which juxtaposes rocks of different metamorphism. The fault separates major structural domains: rocks with one penetrative foliation in the footwall, and pin-striped recrystallized compositional layering, superposed penetrative foliations, and cleavage characterize the hanging wall. These relationships are ambiguous along strike to the southwest, where the Ashe and Alligator Back formations are recrystallized at higher metamorphic grades.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
1982-05-07
The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
French Interim MALE UAV Program
2003-09-02
MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
A Continuum Approach for Developing School Leaders in an Urban District
ERIC Educational Resources Information Center
Normore, Anthony
2007-01-01
This study examined a four-staged leadership development continuum for school leaders in a large urban school district in the southeastern United States. The program under examination included: LEAD Program; Interim Assistant Principal Program; Intern Principal Program, and; First Year Principal Support/Interim Principal Program. Qualitative…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
2016-07-29
This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.
76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-21
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
76 FR 19909 - International Terrorism Victim Expense Reimbursement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...
76 FR 72623 - Literacy Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... INFORMATION: This document finalizes the Bureau's Literacy Program regulations, published as an interim rule... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 544 [BOP-1036-F] RIN 1120-AA33 Literacy... Bureau's Literacy Program regulations, published as an interim rule on September 26, 1997 (62 FR 50791...
Diversified Satellite Occupations Program. Interim Report.
ERIC Educational Resources Information Center
Call, John Reed
This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...
2014-01-06
The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
2005-03-16
This interim final rule establishes requirements and procedures for implementation of TRICARE Reserve Select. It also revises requirements and procedures for the Transitional Assistance Management Program. In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.
Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky
2014-07-01
The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.
DOT National Transportation Integrated Search
2007-11-01
This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...
ERIC Educational Resources Information Center
Illinois State Dept. on Aging, Springfield.
This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…
National Home Start Evaluation. Interim Report V: Case Studies.
ERIC Educational Resources Information Center
Jerome, Chris H.; And Others
One of a series of documents on the evaluation of the National Home Start (NHS) program this third year interim report of case studies describes program efforts and successes with 16 Home Start families throughout the nation. A federally funded demonstration program, NHS is aimed at providing home-based services (such as health, education,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...
78 FR 70244 - Electronic Interim Assistance Reimbursement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
ERIC Educational Resources Information Center
Southwest Regional Lab., Los Alamitos, CA.
This document presents an interim report about tobacco use and its prevention among students in California schools. It focuses on the efforts of the Tobacco Use Prevention Education (TUPE) program, a part of the California Department of Education's Drug, Alcohol, and Tobacco Education (DATE) program. It is noted that TUPE programs have operated in…
78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... the CMAQ Program as a result of the enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The Interim Guidance also contains changes to clarify the 2008 CMAQ Program Guidance. Because... Act for the 21st Century (TEA-21) (Pub. L. 105-178; Oct. 1998) and the Safe, Accountable, Flexible...
National Home Start Evaluation Interim Report VII. Twenty-Month Program Analysis and Findings.
ERIC Educational Resources Information Center
Love, John M.; And Others
This interim evaluation report focuses on process (formative) and outcome (summative) data collected in spring 1975 on the National Home Start Program. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with…
42 CFR 110.83 - Payment of all benefits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Secretary determines the mechanism of payment of Program benefits. She may choose to pay any benefits under... Secretary has the discretion to make interim payments of benefits under this Program, even before a final... only in exceptional cases. The Secretary may, for example, make an interim payment of medical benefits...
School Health Program. Interim Guide. Grade 9.
ERIC Educational Resources Information Center
Northwest Territories Dept. of Education, Yellowknife.
This interim guide, a component of the Northwest Territories (Canada) School Health Program, includes instructional strategies, lesson plans, reproducibles, and teacher background materials for ninth grade classes. The material is organized around the three curriculum units: (1) the mental and emotional well-being unit which has three lessons on…
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
NASA Astrophysics Data System (ADS)
Hughes, Allen A.
1994-12-01
Public safety can be enhanced through the development of a comprehensive medical device risk management. This can be accomplished through case studies using a framework that incorporates cost-benefit analysis in the evaluation of risk management attributes. This paper presents a framework for evaluating the risk management system for regulatory Class III medical devices. The framework consists of the following sixteen attributes of a comprehensive medical device risk management system: fault/failure analysis, premarket testing/clinical trials, post-approval studies, manufacturer sponsored hospital studies, product labeling, establishment inspections, problem reporting program, mandatory hospital reporting, medical literature surveillance, device/patient registries, device performance monitoring, returned product analysis, autopsy program, emergency treatment funds/interim compensation, product liability, and alternative compensation mechanisms. Review of performance histories for several medical devices can reveal the value of information for many attributes, and also the inter-dependencies of the attributes in generating risk information flow. Such an information flow network is presented as a starting point for enhancing medical device risk management by focusing on attributes with high net benefit values and potential to spur information dissemination.
76 FR 21109 - Rural Energy for America Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
...The Rural Business-Cooperative Service (Agency) is establishing an interim rule for the Rural Energy for America Program (REAP), which is authorized under the Food, Conservation, and Energy Act of 2008. This interim rule modifies the existing grant and guaranteed loan program for renewable energy systems and energy efficiency improvements. In addition, it adds a grant program for feasibility studies for renewable energy systems and a grant program for energy audits and renewable energy development assistance, as provided in the Food, Conservation, and Energy Act of 2008.
Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny
2015-01-01
Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…
The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.
ERIC Educational Resources Information Center
Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris
This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
2008-07-17
OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Practice; Interim Commission Review of Public Company Accounting Oversight Board Inspection Reports and... facilitate interim Commission review of Public Company Accounting Oversight Board [[Page 47445
2010-08-06
This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This third year interim report, one of a series of documents on the evaluation of Project Developmental Continuity (PDC), presents findings from three major analyses of program implementation; measurement of the extent each program has implemented the basic PDC Guidelines; a description of patterns of that implementation; and analysis of some…
ERIC Educational Resources Information Center
Perlberg, Arye; Rom, Yael
This resume of an interim report discusses a university preparatory program for Israeli soldiers of Islamic (Sephardic) origin. The Israeli Defense Forces identify and select the candidates, who must be of Sephardic, low socioeconomic status background and have certificates from academic or vocational high schools. The chosen students are soldiers…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... (202) 501-4755. List of Rules in FAC 2005-51 Item Subject FAR case Analyst *I Women-Owned Small 2010...--Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) (Interim) This interim rule amends the FAR to add subpart 19.15, Women-Owned Small Business Program, which will assist Federal agencies in...
Alaska Interim Land Cover Mapping Program; final report
Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan
1989-01-01
In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...
The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions
NASA Technical Reports Server (NTRS)
Kruk, Jeffrey W.
2012-01-01
The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…
Autonomy Level Specification for Intelligent Autonomous Vehicles
2003-09-01
Autonomy Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report Hui-Min Huang, Elena Messina, James Albus...Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6
McElroy, Lisa M; Khorzad, Rebeca; Rowe, Theresa A; Abecassis, Zachary A; Apley, Daniel W; Barnard, Cynthia; Holl, Jane L
The purpose of this study was to use fault tree analysis to evaluate the adequacy of quality reporting programs in identifying root causes of postoperative bloodstream infection (BSI). A systematic review of the literature was used to construct a fault tree to evaluate 3 postoperative BSI reporting programs: National Surgical Quality Improvement Program (NSQIP), Centers for Medicare and Medicaid Services (CMS), and The Joint Commission (JC). The literature review revealed 699 eligible publications, 90 of which were used to create the fault tree containing 105 faults. A total of 14 identified faults are currently mandated for reporting to NSQIP, 5 to CMS, and 3 to JC; 2 or more programs require 4 identified faults. The fault tree identifies numerous contributing faults to postoperative BSI and reveals substantial variation in the requirements and ability of national quality data reporting programs to capture these potential faults. Efforts to prevent postoperative BSI require more comprehensive data collection to identify the root causes and develop high-reliability improvement strategies.
A randomized controlled trial of interim methadone maintenance.
Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J
2006-01-01
Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.
1982-04-12
EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.
2014-03-19
This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1992-09-01
This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pretzsch, Gunter; Salewski, Peter; Sogalla, Martin
2013-07-01
The German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) on behalf of the Government of the Federal Republic of Germany supports the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) in enhancement of nuclear safety and radiation protection and strengthening of the physical protection. One of the main objectives of the agreement concluded by these parties in 2008 was the retrieval and safe interim storage of disused orphan high radioactive sealed sources in Ukraine. At present, the Ukrainian National Registry does not account all high active radiation sources but only for about 70 - 80 %. GRSmore » in charge of BMU to execute the program since 2008 concluded subcontracts with the waste management and interim storage facilities RADON at different regions in Ukraine as well with the waste management and interim storage facility IZOTOP at Kiev. Below selected examples of removal of high active Co-60 and Cs-137 sources from irradiation facilities at research institutes are described. By end of 2012 removal and safe interim storage of 12.000 disused radioactive sealed sources with a total activity of more than 5,7.10{sup 14} Bq was achieved within the frame of this program. The German support program will be continued up to the end of 2013 with the aim to remove and safely store almost all disused radioactive sealed sources in Ukraine. (authors)« less
Expert System Detects Power-Distribution Faults
NASA Technical Reports Server (NTRS)
Walters, Jerry L.; Quinn, Todd M.
1994-01-01
Autonomous Power Expert (APEX) computer program is prototype expert-system program detecting faults in electrical-power-distribution system. Assists human operators in diagnosing faults and deciding what adjustments or repairs needed for immediate recovery from faults or for maintenance to correct initially nonthreatening conditions that could develop into faults. Written in Lisp.
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Boerschlein, David P.
1993-01-01
Fault-Tree Compiler (FTC) program, is software tool used to calculate probability of top event in fault tree. Gates of five different types allowed in fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N. High-level input language easy to understand and use. In addition, program supports hierarchical fault-tree definition feature, which simplifies tree-description process and reduces execution time. Set of programs created forming basis for reliability-analysis workstation: SURE, ASSIST, PAWS/STEM, and FTC fault-tree tool (LAR-14586). Written in PASCAL, ANSI-compliant C language, and FORTRAN 77. Other versions available upon request.
Strain Partitioning and Present-Day Fault Kinematics in NW Tibet From Envisat SAR Interferometry
NASA Astrophysics Data System (ADS)
Daout, Simon; Doin, Marie-Pierre; Peltzer, Gilles; Lasserre, Cécile; Socquet, Anne; Volat, Matthieu; Sudhaus, Henriette
2018-03-01
An 8 year archive of Envisat synthetic aperture radar (SAR) data over a 300 × 500 km2 wide area in northwestern Tibet is analyzed to construct a line-of-sight map of the current surface velocity field. The resulting velocity map reveals (1) a velocity gradient across the Altyn Tagh fault, (2) a sharp velocity change along a structure following the base of the alluvial fans in southern Tarim, and (3) a broad velocity gradient, following the Jinsha suture. The interferometric synthetic aperture radar velocity field is combined with published GPS data to constrain the geometry and slip rates of a fault model consisting of a vertical fault plane under the Altyn Tagh fault and a shallow flat décollement ending in a steeper ramp on the Tarim side. The solutions converge toward 0.7 mm/yr of pure thrusting on the décollement-ramp system and 10.5 mm/yr of left-lateral strike-slip movement on the Altyn Tagh fault, below a 17 km locking depth. A simple elastic dislocation model across the Jinsha suture shows that data are consistent with 4-8 mm/yr of left-lateral shear across this structure. Interferometric synthetic aperture radar processing steps include implementing a stepwise unwrapping method starting with high-quality interferograms to assist in unwrapping noisier interferograms, iteratively estimating long-wavelength spatial ramps, and referencing all interferograms to bedrock pixels surrounding sedimentary basins. A specific focus on atmospheric delay estimation using the ERA-Interim model decreases the uncertainty on the velocity across the Tibet border by a factor of 2.
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...
"Intelligent" Computer Assisted Instruction (CAI) Applications. Interim Report.
ERIC Educational Resources Information Center
Brown, John Seely; And Others
Interim work is documented describing efforts to modify computer techniques used to recognize and process English language requests to an instructional simulator. The conversion from a hand-coded to a table driven technique are described in detail. Other modifications to a simulation based computer assisted instruction program to allow a gaming…
78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...
The Urban Consumer Education Project. Interim Report, 1979-80.
ERIC Educational Resources Information Center
Marshall, Gail; Haas, Kay
This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…
Interim Evaluation of the National Literacy Program. Final Report
ERIC Educational Resources Information Center
Human Resources and Social Development Canada, 2007
2007-01-01
The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…
Measurement of fault latency in a digital avionic miniprocessor
NASA Technical Reports Server (NTRS)
Mcgough, J. G.; Swern, F. L.
1981-01-01
The results of fault injection experiments utilizing a gate-level emulation of the central processor unit of the Bendix BDX-930 digital computer are presented. The failure detection coverage of comparison-monitoring and a typical avionics CPU self-test program was determined. The specific tasks and experiments included: (1) inject randomly selected gate-level and pin-level faults and emulate six software programs using comparison-monitoring to detect the faults; (2) based upon the derived empirical data develop and validate a model of fault latency that will forecast a software program's detecting ability; (3) given a typical avionics self-test program, inject randomly selected faults at both the gate-level and pin-level and determine the proportion of faults detected; (4) determine why faults were undetected; (5) recommend how the emulation can be extended to multiprocessor systems such as SIFT; and (6) determine the proportion of faults detected by a uniprocessor BIT (built-in-test) irrespective of self-test.
GUI Type Fault Diagnostic Program for a Turboshaft Engine Using Fuzzy and Neural Networks
NASA Astrophysics Data System (ADS)
Kong, Changduk; Koo, Youngju
2011-04-01
The helicopter to be operated in a severe flight environmental condition must have a very reliable propulsion system. On-line condition monitoring and fault detection of the engine can promote reliability and availability of the helicopter propulsion system. A hybrid health monitoring program using Fuzzy Logic and Neural Network Algorithms can be proposed. In this hybrid method, the Fuzzy Logic identifies easily the faulted components from engine measuring parameter changes, and the Neural Networks can quantify accurately its identified faults. In order to use effectively the fault diagnostic system, a GUI (Graphical User Interface) type program is newly proposed. This program is composed of the real time monitoring part, the engine condition monitoring part and the fault diagnostic part. The real time monitoring part can display measuring parameters of the study turboshaft engine such as power turbine inlet temperature, exhaust gas temperature, fuel flow, torque and gas generator speed. The engine condition monitoring part can evaluate the engine condition through comparison between monitoring performance parameters the base performance parameters analyzed by the base performance analysis program using look-up tables. The fault diagnostic part can identify and quantify the single faults the multiple faults from the monitoring parameters using hybrid method.
Tribal child welfare. Interim final rule.
2012-01-06
The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Martensen, Anna L.
1992-01-01
FTC, Fault-Tree Compiler program, is reliability-analysis software tool used to calculate probability of top event of fault tree. Five different types of gates allowed in fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N. High-level input language of FTC easy to understand and use. Program supports hierarchical fault-tree-definition feature simplifying process of description of tree and reduces execution time. Solution technique implemented in FORTRAN, and user interface in Pascal. Written to run on DEC VAX computer operating under VMS operating system.
Public School Finance Problems in Texas. An Interim Report.
ERIC Educational Resources Information Center
Texas Research League, Austin.
The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…
ERIC Educational Resources Information Center
United Nations Economic and Social Council, New York, NY.
This interim report, commissioned by UNICEF, emphasizes the value of nonformal educational programs to educationally deprived rural children and youth in developing countries. The first set of basic findings and recommendations arising from this extensive international research study is presented. Organized into five chapters, the text includes…
Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...
System architecture for the Canadian interim mobile satellite system
NASA Technical Reports Server (NTRS)
Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.
1988-01-01
The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.
To Have and to Hold: Reflections of an Interim Director
ERIC Educational Resources Information Center
Hibl, Lisa M.
2018-01-01
Leading a long-established LLC as an Interim Director poses particular challenges and rewards. Uncertainties abound for the program and for the individual. Professionally speaking, taking on the hybrid role of faculty/ administrator can be both difficult and exciting. Ultimately, the solutions are in the details. Listening carefully to students,…
Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
TORRES, T.D.
RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less
2005-03-25
This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.
Automatic translation of digraph to fault-tree models
NASA Technical Reports Server (NTRS)
Iverson, David L.
1992-01-01
The author presents a technique for converting digraph models, including those models containing cycles, to a fault-tree format. A computer program which automatically performs this translation using an object-oriented representation of the models has been developed. The fault-trees resulting from translations can be used for fault-tree analysis and diagnosis. Programs to calculate fault-tree and digraph cut sets and perform diagnosis with fault-tree models have also been developed. The digraph to fault-tree translation system has been successfully tested on several digraphs of varying size and complexity. Details of some representative translation problems are presented. Most of the computation performed by the program is dedicated to finding minimal cut sets for digraph nodes in order to break cycles in the digraph. Fault-trees produced by the translator have been successfully used with NASA's Fault-Tree Diagnosis System (FTDS) to produce automated diagnostic systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less
Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.
Shek, Daniel T L; Yu, Lu; Chan, Alex C W
2012-01-17
An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.
Runtime Speculative Software-Only Fault Tolerance
2012-06-01
reliability of RSFT, a in-depth analysis on its window of vulnerability is also discussed and measured via simulated fault injection. The performance...propagation of faults through the entire program. For optimal performance, these techniques have to use herotic alias analysis to find the minimum set of...affect program output. No program source code or alias analysis is needed to analyze the fault propagation ahead of time. 2.3 Limitations of Existing
Research study on materials processing in space Skylab experiment M553 - sphere forming
NASA Technical Reports Server (NTRS)
Johnson, P. C.; Peters, E. T.; Wechsler, A. E.
1973-01-01
A research program was conducted to study the solidification of metals in the form of small spheres both in the one gravity environment of the earth laboratory and the low gravity environment of KC-135 trajectory flights and the Skylab 1/2 mission. The program had three phases. The details of the results of this program are contained in interim reports prepared at the conclusion of each of the three phases. This final report is intended to summarize the efforts and results described in detail in each of these interim reports, with particular emphasis on the differences observed between the ground-based and Skylab flight specimens.
ERIC Educational Resources Information Center
Granville, Arthur; And Others
This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
Generator Set Environmental and Stability Testing
2015-03-01
UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by Gregory A. Hansen Edwin A...it to the originator. UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by...TITLE AND SUBTITLE Generator Set Environmental and Stability Testing 5a. CONTRACT NUMBER W56HZV-09-C-0100 5b. GRANT NUMBER 5c. PROGRAM
ERIC Educational Resources Information Center
Rochester City School District, NY.
This is an interim report of the second full year of the "Fifteen Point Plan." Although majority of comparisons between groups shows no significant statistical differences, differentials in achievement may become more noticeable as the program effects are reinforced with time, and through cumulative experience. From data analyzed after…
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
.... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...
75 FR 31609 - Conservation Stewardship Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
...Section 2301 of the Food, Conservation, and Energy Act of 2008 (2008 Act) amended the Food Security Act of 1985 to establish the Conservation Stewardship Program (CSP). On July 29, 2009, the Natural Resources Conservation Service (NRCS) published an interim final rule for CSP with a 60-day public comment period. On September 21, 2009, the public comment period was extended 30 days. NRCS is publishing a final rule that addresses the comments received on the interim final rule and makes other minor adjustments to improve clarity of the rule.
Slicken 1.0: Program for calculating the orientation of shear on reactivated faults
NASA Astrophysics Data System (ADS)
Xu, Hong; Xu, Shunshan; Nieto-Samaniego, Ángel F.; Alaniz-Álvarez, Susana A.
2017-07-01
The slip vector on a fault is an important parameter in the study of the movement history of a fault and its faulting mechanism. Although there exist many graphical programs to represent the shear stress (or slickenline) orientations on faults, programs to quantitatively calculate the orientation of fault slip based on a given stress field are scarce. In consequence, we develop Slicken 1.0, a software to rapidly calculate the orientation of maximum shear stress on any fault plane. For this direct method of calculating the resolved shear stress on a planar surface, the input data are the unit vector normal to the involved plane, the unit vectors of the three principal stress axes, and the stress ratio. The advantage of this program is that the vertical or horizontal principal stresses are not necessarily required. Due to its nimble design using Java SE 8.0, it runs on most operating systems with the corresponding Java VM. The software program will be practical for geoscience students, geologists and engineers and will help resolve a deficiency in field geology, and structural and engineering geology.
NASA Technical Reports Server (NTRS)
Friedl, Randall R. (Editor)
1997-01-01
This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…
A Model Project in Career Education, K-12. Interim Report, December 1974.
ERIC Educational Resources Information Center
Wyoming State Dept. of Education, Cheyenne.
The document presents an interim report of a project to establish career education programs for K-12 students in the Natrona County School District of Casper, Wyoming. Project activities were divided into: (1) career awareness, grades K-6; (2) career exploration, grades 7-9; (3) career preparation, grades 10-12; and (4) guidance. To meet the…
ERIC Educational Resources Information Center
Frazier, Don
The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.
2005-09-21
The Department is publishing this interim final rule to implement sections 711 and 715 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05), Public Law 108-375. Specifically, that legislation makes young dependents of deceased Service members eligible for enrollment in the TRICARE Dental Program when the child was not previously enrolled because of age, and authorizes post-graduate dental residents in a dental treatment facility of the uniformed services under a graduate dental education program accredited by the American Dental Association to provide dental treatment to dependents who are 12 years of age or younger and who are covered by a dental plan established under 10 U.S.C. 1076a. This rule also corrects certain references in 32 CFR 199.13. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates. Public comments are invited and will be considered for possible revisions to the final rule.
Progress and future direction for the interim safe storage and disposal of Hanford high-level waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.
This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less
NASA Astrophysics Data System (ADS)
Goto, J.; Miwa, T.; Tsuchi, H.; Karasaki, K.
2009-12-01
The Nuclear Waste Management Organization of Japan (NUMO), after volunteering municipalities arise, will start a three-staged program for selecting a HLW and TRU waste repository site. It is recognized from experiences from various site characterization programs in the world that the hydrologic property of faults is one of the most important parameters in the early stage of the program. It is expected that numerous faults of interest exist in an investigation area of several tens of square kilometers. It is, however, impossible to characterize all these faults in a limited time and budget. This raises problems in the repository designing and safety assessment that we may have to accept unrealistic or over conservative results by using a single model or parameters for all the faults in the area. We, therefore, seek to develop an efficient and practical methodology to characterize hydrologic property of faults. This project is a five year program started in 2007, and comprises the basic methodology development through literature study and its verification through field investigations. The literature study tries to classify faults by correlating their geological features with hydraulic property, to search for the most efficient technology for fault characterization, and to develop a work flow diagram. The field investigation starts from selection of a site and fault(s), followed by existing site data analyses, surface geophysics, geological mapping, trenching, water sampling, a series of borehole investigations and modeling/analyses. Based on the results of the field investigations, we plan to develop a systematic hydrologic characterization methodology of faults. A classification method that correlates combinations of geological features (rock type, fault displacement, fault type, position in a fault zone, fracture zone width, damage zone width) with widths of high permeability zones around a fault zone was proposed through a survey on available documents of the site characterization programs. The field investigation started in 2008, by selecting the Wildcat Fault that cut across the Laurence Berkeley National Laboratory (LBNL) site as the target. Analyses on site-specific data, surface geophysics, geological mapping and trenching have confirmed the approximate location and characteristics of the fault (see Session H48, Onishi, et al). The plan for the remaining years includes borehole investigations at LBNL, and another series of investigations in the northern part of the Wildcat Fault.
Modeling of a latent fault detector in a digital system
NASA Technical Reports Server (NTRS)
Nagel, P. M.
1978-01-01
Methods of modeling the detection time or latency period of a hardware fault in a digital system are proposed that explain how a computer detects faults in a computational mode. The objectives were to study how software reacts to a fault, to account for as many variables as possible affecting detection and to forecast a given program's detecting ability prior to computation. A series of experiments were conducted on a small emulated microprocessor with fault injection capability. Results indicate that the detecting capability of a program largely depends on the instruction subset used during computation and the frequency of its use and has little direct dependence on such variables as fault mode, number set, degree of branching and program length. A model is discussed which employs an analog with balls in an urn to explain the rate of which subsequent repetitions of an instruction or instruction set detect a given fault.
The Fault Tree Compiler (FTC): Program and mathematics
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Martensen, Anna L.
1989-01-01
The Fault Tree Compiler Program is a new reliability tool used to predict the top-event probability for a fault tree. Five different gate types are allowed in the fault tree: AND, OR, EXCLUSIVE OR, INVERT, AND m OF n gates. The high-level input language is easy to understand and use when describing the system tree. In addition, the use of the hierarchical fault tree capability can simplify the tree description and decrease program execution time. The current solution technique provides an answer precisely (within the limits of double precision floating point arithmetic) within a user specified number of digits accuracy. The user may vary one failure rate or failure probability over a range of values and plot the results for sensitivity analyses. The solution technique is implemented in FORTRAN; the remaining program code is implemented in Pascal. The program is written to run on a Digital Equipment Corporation (DEC) VAX computer with the VMS operation system.
Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
2017-02-23
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.
System and method for bearing fault detection using stator current noise cancellation
Zhou, Wei; Lu, Bin; Habetler, Thomas G.; Harley, Ronald G.; Theisen, Peter J.
2010-08-17
A system and method for detecting incipient mechanical motor faults by way of current noise cancellation is disclosed. The system includes a controller configured to detect indicia of incipient mechanical motor faults. The controller further includes a processor programmed to receive a baseline set of current data from an operating motor and define a noise component in the baseline set of current data. The processor is also programmed to repeatedly receive real-time operating current data from the operating motor and remove the noise component from the operating current data in real-time to isolate any fault components present in the operating current data. The processor is then programmed to generate a fault index for the operating current data based on any isolated fault components.
Effects of Interim Assessments on Student Achievement: Evidence from a Large-Scale Experiment
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Miller, Shazia R.; van der Ploeg, Arie; Li, Wei
2016-01-01
We use data from a large-scale, school-level randomized experiment conducted in 2010-2011 in public schools in Indiana. Our sample includes more than 30,000 students in 70 schools. We examine the impact of two interim assessment programs (i.e., mCLASS in Grades K-2 and Acuity in Grades 3--8) on mathematics and reading achievement. Two-level models…
Natalie A. Bolon; Christopher S. Hansen-Murray; Richard W. Haynes
1995-01-01
Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments
NASA Technical Reports Server (NTRS)
Pepin, Gerard R.; Hager, E. Paul
1991-01-01
The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities. It describes the groundwater monitoring criteria for interim status and permitted facilities. It explains monitoring well placement and outlines the three stages of the groundwater monitoring program for permitted facilities.
ERIC Educational Resources Information Center
Seftor, Neil S.; Calcagno, Juan Carlos
2010-01-01
This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…
Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…
Integrated Approach To Design And Analysis Of Systems
NASA Technical Reports Server (NTRS)
Patterson-Hine, F. A.; Iverson, David L.
1993-01-01
Object-oriented fault-tree representation unifies evaluation of reliability and diagnosis of faults. Programming/fault tree described more fully in "Object-Oriented Algorithm For Evaluation Of Fault Trees" (ARC-12731). Augmented fault tree object contains more information than fault tree object used in quantitative analysis of reliability. Additional information needed to diagnose faults in system represented by fault tree.
NASA Technical Reports Server (NTRS)
Rogers, William H.; Schutte, Paul C.
1993-01-01
Advanced fault management aiding concepts for commercial pilots are being developed in a research program at NASA Langley Research Center. One aim of this program is to re-evaluate current design principles for display of fault information to the flight crew: (1) from a cognitive engineering perspective and (2) in light of the availability of new types of information generated by advanced fault management aids. The study described in this paper specifically addresses principles for organizing fault information for display to pilots based on their mental models of fault management.
U.S. Aeronautical L-Band Satellite Technology Test Program : Interim Tests Results
DOT National Transportation Integrated Search
1975-06-01
The U.S. Aeronautical L-Band satellite test program was performed between September 1974 and April 1975 as part of an international ATS-6 L-Band satellite test program. The U.S. program consisted of both technology and ATC communications demonstratio...
Computer Science 205. Interim Guide, 1983.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide to a 4-unit, required high school computer science course emphasizes problem solving and computer programming and is designed for use with a variety of hardware configurations and programming languages. An overview covers the program rationale, goals and objectives, program design and description, program implementation, time allotment,…
NASA Technical Reports Server (NTRS)
Harper, Richard
1989-01-01
In a fault-tolerant parallel computer, a functional programming model can facilitate distributed checkpointing, error recovery, load balancing, and graceful degradation. Such a model has been implemented on the Draper Fault-Tolerant Parallel Processor (FTPP). When used in conjunction with the FTPP's fault detection and masking capabilities, this implementation results in a graceful degradation of system performance after faults. Three graceful degradation algorithms have been implemented and are presented. A user interface has been implemented which requires minimal cognitive overhead by the application programmer, masking such complexities as the system's redundancy, distributed nature, variable complement of processing resources, load balancing, fault occurrence and recovery. This user interface is described and its use demonstrated. The applicability of the functional programming style to the Activation Framework, a paradigm for intelligent systems, is then briefly described.
IVHS Countermeasures For Rear-End Collisions, Task 2 - Functional Goals, Interim Report
DOT National Transportation Integrated Search
1996-05-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. : THIS PROGRAM?S PRIMARY OBJECTIVE IS THE DEVELOPMENT OF PRACTICAL PERFORMANCE : GUIDELINES OR SPECIFICATIONS FOR RE...
User's guide to programming fault injection and data acquisition in the SIFT environment
NASA Technical Reports Server (NTRS)
Elks, Carl R.; Green, David F.; Palumbo, Daniel L.
1987-01-01
Described are the features, command language, and functional design of the SIFT (Software Implemented Fault Tolerance) fault injection and data acquisition interface software. The document is also intended to assist and guide the SIFT user in defining, developing, and executing SIFT fault injection experiments and the subsequent collection and reduction of that fault injection data. It is also intended to be used in conjunction with the SIFT User's Guide (NASA Technical Memorandum 86289) for reference to SIFT system commands, procedures and functions, and overall guidance in SIFT system programming.
Commentary: Interim leadership of academic departments at U.S. medical schools.
Grigsby, R Kevin; Aber, Robert C; Quillen, David A
2009-10-01
Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.
Determining on-fault earthquake magnitude distributions from integer programming
NASA Astrophysics Data System (ADS)
Geist, Eric L.; Parsons, Tom
2018-02-01
Earthquake magnitude distributions among faults within a fault system are determined from regional seismicity and fault slip rates using binary integer programming. A synthetic earthquake catalog (i.e., list of randomly sampled magnitudes) that spans millennia is first formed, assuming that regional seismicity follows a Gutenberg-Richter relation. Each earthquake in the synthetic catalog can occur on any fault and at any location. The objective is to minimize misfits in the target slip rate for each fault, where slip for each earthquake is scaled from its magnitude. The decision vector consists of binary variables indicating which locations are optimal among all possibilities. Uncertainty estimates in fault slip rates provide explicit upper and lower bounding constraints to the problem. An implicit constraint is that an earthquake can only be located on a fault if it is long enough to contain that earthquake. A general mixed-integer programming solver, consisting of a number of different algorithms, is used to determine the optimal decision vector. A case study is presented for the State of California, where a 4 kyr synthetic earthquake catalog is created and faults with slip ≥3 mm/yr are considered, resulting in >106 variables. The optimal magnitude distributions for each of the faults in the system span a rich diversity of shapes, ranging from characteristic to power-law distributions.
NASA Astrophysics Data System (ADS)
Pascal, Christophe
2004-04-01
Stress inversion programs are nowadays frequently used in tectonic analysis. The purpose of this family of programs is to reconstruct the stress tensor characteristics from fault slip data acquired in the field or derived from earthquake focal mechanisms (i.e. inverse methods). Until now, little attention has been paid to direct methods (i.e. to determine fault slip directions from an inferred stress tensor). During the 1990s, the fast increase in resolution in 3D seismic reflection techniques made it possible to determine the geometry of subsurface faults with a satisfactory accuracy but not to determine precisely their kinematics. This recent improvement allows the use of direct methods. A computer program, namely SORTAN, is introduced. The program is highly portable on Unix platforms, straightforward to install and user-friendly. The computation is based on classical stress-fault slip relationships and allows for fast treatment of a set of faults and graphical presentation of the results (i.e. slip directions). In addition, the SORTAN program permits one to test the sensitivity of the results to input uncertainties. It is a complementary tool to classical stress inversion methods and can be used to check the mechanical consistency and the limits of structural interpretations based upon 3D seismic reflection surveys.
NASA Technical Reports Server (NTRS)
Martensen, Anna L.; Butler, Ricky W.
1987-01-01
The Fault Tree Compiler Program is a new reliability tool used to predict the top event probability for a fault tree. Five different gate types are allowed in the fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N gates. The high level input language is easy to understand and use when describing the system tree. In addition, the use of the hierarchical fault tree capability can simplify the tree description and decrease program execution time. The current solution technique provides an answer precise (within the limits of double precision floating point arithmetic) to the five digits in the answer. The user may vary one failure rate or failure probability over a range of values and plot the results for sensitivity analyses. The solution technique is implemented in FORTRAN; the remaining program code is implemented in Pascal. The program is written to run on a Digital Corporation VAX with the VMS operation system.
Fenix, A Fault Tolerant Programming Framework for MPI Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gamel, Marc; Teranihi, Keita; Valenzuela, Eric
2016-10-05
Fenix provides APIs to allow the users to add fault tolerance capability to MPI-based parallel programs in a transparent manner. Fenix-enabled programs can run through process failures during program execution using a pool of spare processes accommodated by Fenix.
One Week of Public Television, April 1972. Number Seven.
ERIC Educational Resources Information Center
Katzman, Natan
Seventh in a series of annual surveys, this interim report describes analyses of the programing schedules of public television broadcasters during one week in April, 1972. Results are reported for four different types of programing: instructional programing, Children's Television Workshop productions, news and public affairs programing, and…
System and method for motor fault detection using stator current noise cancellation
Zhou, Wei; Lu, Bin; Nowak, Michael P.; Dimino, Steven A.
2010-12-07
A system and method for detecting incipient mechanical motor faults by way of current noise cancellation is disclosed. The system includes a controller configured to detect indicia of incipient mechanical motor faults. The controller further includes a processor programmed to receive a baseline set of current data from an operating motor and define a noise component in the baseline set of current data. The processor is also programmed to acquire at least on additional set of real-time operating current data from the motor during operation, redefine the noise component present in each additional set of real-time operating current data, and remove the noise component from the operating current data in real-time to isolate any fault components present in the operating current data. The processor is then programmed to generate a fault index for the operating current data based on any isolated fault components.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Final Project Report. Scalable fault tolerance runtime technology for petascale computers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krishnamoorthy, Sriram; Sadayappan, P
With the massive number of components comprising the forthcoming petascale computer systems, hardware failures will be routinely encountered during execution of large-scale applications. Due to the multidisciplinary, multiresolution, and multiscale nature of scientific problems that drive the demand for high end systems, applications place increasingly differing demands on the system resources: disk, network, memory, and CPU. In addition to MPI, future applications are expected to use advanced programming models such as those developed under the DARPA HPCS program as well as existing global address space programming models such as Global Arrays, UPC, and Co-Array Fortran. While there has been amore » considerable amount of work in fault tolerant MPI with a number of strategies and extensions for fault tolerance proposed, virtually none of advanced models proposed for emerging petascale systems is currently fault aware. To achieve fault tolerance, development of underlying runtime and OS technologies able to scale to petascale level is needed. This project has evaluated range of runtime techniques for fault tolerance for advanced programming models.« less
Evaluation of the healthy schools program: Part I. Interim progress.
Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C
2012-01-01
Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.
Castelnuovo, Gianluca; Manzoni, Gian Mauro; Cuzziol, Paola; Cesa, Gian Luca; Corti, Stefania; Tuzzi, Cristina; Villa, Valentina; Liuzzi, Antonio; Petroni, Maria Letizia; Molinari, Enrico
2011-03-04
Obesity increases the risk of many health complications such as hypertension, coronary heart disease and type 2 diabetes, needs long-lasting treatment for effective results and involves high public and private care-costs. Therefore, it is imperative that enduring and low-cost clinical programs for obesity and related co-morbidities are developed and evaluated. Information and communication technologies (ICT) can help clinicians to deliver treatment in a cost-effective and time-saving manner to a large number of obese individuals with co-morbidities. To examine ad interim effectiveness of a 12-month multidisciplinary telecare intervention for weight loss provided to obese patients with type 2 diabetes. A single-center randomized controlled trial (TECNOB study) started in December 2008. At present, 72 obese patients with type 2 diabetes have been recruited and randomly allocated to the TECNOB program (n=37) or to a control condition (n=39). However, only 34 participants have completed at least the 3-month follow-up and have been included in this ad interim analysis. 21 out of them have reached also the 6-month follow-up and 13 have achieved the end of the program. Study is still on-going. All participants attended 1-month inpatient intensive program that involved individualized medical care, diet therapy, physical training and brief psychological counseling. At discharge, participants allocated to the TECNOB program were instructed to use a weight-loss web-site, a web-based videoconference tool, a dietary software installed into their cellular phones and an electronic armband measuring daily steps and energy expenditure. Weight and disordered eating-related behaviors and cognitions (EDI-2) at entry to hospital, at discharge from hospital, at 3,6 and 12 months. Ad interim analysis of data from 34 participants showed no statistically significant difference between groups in weight change at any time-point. However, within-group analysis revealed significant reductions of initial weight at discharge from hospital, at 3 months, at 6 months but not at 12 months. Control group had higher scores in Interpersonal distrust at 12 months. This ad interim findings revealed that the effect of the inpatient treatment was high and probably overwhelmed the effect of the TECNOB intervention. Much statistical power and long-term follow-up may enhance the probability to detect the TECNOB effect over and above the great one exerted by the inpatient program.
Fault management for data systems
NASA Technical Reports Server (NTRS)
Boyd, Mark A.; Iverson, David L.; Patterson-Hine, F. Ann
1993-01-01
Issues related to automating the process of fault management (fault diagnosis and response) for data management systems are considered. Substantial benefits are to be gained by successful automation of this process, particularly for large, complex systems. The use of graph-based models to develop a computer assisted fault management system is advocated. The general problem is described and the motivation behind choosing graph-based models over other approaches for developing fault diagnosis computer programs is outlined. Some existing work in the area of graph-based fault diagnosis is reviewed, and a new fault management method which was developed from existing methods is offered. Our method is applied to an automatic telescope system intended as a prototype for future lunar telescope programs. Finally, an application of our method to general data management systems is described.
Program listing for fault tree analysis of JPL technical report 32-1542
NASA Technical Reports Server (NTRS)
Chelson, P. O.
1971-01-01
The computer program listing for the MAIN program and those subroutines unique to the fault tree analysis are described. Some subroutines are used for analyzing the reliability block diagram. The program is written in FORTRAN 5 and is running on a UNIVAC 1108.
KINKFOLD—an AutoLISP program for construction of geological cross-sections using borehole image data
NASA Astrophysics Data System (ADS)
Özkaya, Sait Ismail
2002-04-01
KINKFOLD is an AutoLISP program designed to construct geological cross-sections from borehole image or dip meter logs. The program uses the kink-fold method for cross-section construction. Beds are folded around hinge lines as angle bisectors so that bedding thickness remains unchanged. KINKFOLD may be used to model a wide variety of parallel fold structures, including overturned and faulted folds, and folds truncated by unconformities. The program accepts data from vertical or inclined boreholes. The KINKFOLD program cannot be used to model fault drag, growth folds, inversion structures or disharmonic folds where the bed thickness changes either because of deformation or deposition. Faulted structures and similar folds can be modelled by KINKFOLD by omitting dip measurements within fault drag zones and near axial planes of similar folds.
Determining on-fault earthquake magnitude distributions from integer programming
Geist, Eric L.; Parsons, Thomas E.
2018-01-01
Earthquake magnitude distributions among faults within a fault system are determined from regional seismicity and fault slip rates using binary integer programming. A synthetic earthquake catalog (i.e., list of randomly sampled magnitudes) that spans millennia is first formed, assuming that regional seismicity follows a Gutenberg-Richter relation. Each earthquake in the synthetic catalog can occur on any fault and at any location. The objective is to minimize misfits in the target slip rate for each fault, where slip for each earthquake is scaled from its magnitude. The decision vector consists of binary variables indicating which locations are optimal among all possibilities. Uncertainty estimates in fault slip rates provide explicit upper and lower bounding constraints to the problem. An implicit constraint is that an earthquake can only be located on a fault if it is long enough to contain that earthquake. A general mixed-integer programming solver, consisting of a number of different algorithms, is used to determine the optimal decision vector. A case study is presented for the State of California, where a 4 kyr synthetic earthquake catalog is created and faults with slip ≥3 mm/yr are considered, resulting in >106 variables. The optimal magnitude distributions for each of the faults in the system span a rich diversity of shapes, ranging from characteristic to power-law distributions.
Science 26: Teacher Resource Manual. Integrated Occupational Program. Interim 1991.
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
The Integrated Occupation Science 26 Program is an optional program designed to allow students in Alberta, Canada to meet the credit requirements of the Certificate of Achievement and facilitate transfer to the General High School Diploma Program. This Teacher Resource Manual is provided to assist classroom teachers to implement the Science 26…
76 FR 10089 - Value-Added Producer Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...
77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...
Map and database of Quaternary faults in Venezuela and its offshore regions
Audemard, F.A.; Machette, M.N.; Cox, J.W.; Dart, R.L.; Haller, K.M.
2000-01-01
As part of the International Lithosphere Program’s “World Map of Major Active Faults,” the U.S. Geological Survey is assisting in the compilation of a series of digital maps of Quaternary faults and folds in Western Hemisphere countries. The maps show the locations, ages, and activity rates of major earthquake-related features such as faults and fault-related folds. They are accompanied by databases that describe these features and document current information on their activity in the Quaternary. The project is a key part of the Global Seismic Hazards Assessment Program (ILP Project II-0) for the International Decade for Natural Hazard Disaster Reduction.The project is sponsored by the International Lithosphere Program and funded by the USGS’s National Earthquake Hazards Reduction Program. The primary elements of the project are general supervision and interpretation of geologic/tectonic information, data compilation and entry for fault catalog, database design and management, and digitization and manipulation of data in †ARCINFO. For the compilation of data, we engaged experts in Quaternary faulting, neotectonics, paleoseismology, and seismology.
Using Dynamic Sensitivity Analysis to Assess Testability
NASA Technical Reports Server (NTRS)
Voas, Jeffrey; Morell, Larry; Miller, Keith
1990-01-01
This paper discusses sensitivity analysis and its relationship to random black box testing. Sensitivity analysis estimates the impact that a programming fault at a particular location would have on the program's input/output behavior. Locations that are relatively \\"insensitive" to faults can render random black box testing unlikely to uncover programming faults. Therefore, sensitivity analysis gives new insight when interpreting random black box testing results. Although sensitivity analysis is computationally intensive, it requires no oracle and no human intervention.
Ontology-Based Method for Fault Diagnosis of Loaders.
Xu, Feixiang; Liu, Xinhui; Chen, Wei; Zhou, Chen; Cao, Bingwei
2018-02-28
This paper proposes an ontology-based fault diagnosis method which overcomes the difficulty of understanding complex fault diagnosis knowledge of loaders and offers a universal approach for fault diagnosis of all loaders. This method contains the following components: (1) An ontology-based fault diagnosis model is proposed to achieve the integrating, sharing and reusing of fault diagnosis knowledge for loaders; (2) combined with ontology, CBR (case-based reasoning) is introduced to realize effective and accurate fault diagnoses following four steps (feature selection, case-retrieval, case-matching and case-updating); and (3) in order to cover the shortages of the CBR method due to the lack of concerned cases, ontology based RBR (rule-based reasoning) is put forward through building SWRL (Semantic Web Rule Language) rules. An application program is also developed to implement the above methods to assist in finding the fault causes, fault locations and maintenance measures of loaders. In addition, the program is validated through analyzing a case study.
Ontology-Based Method for Fault Diagnosis of Loaders
Liu, Xinhui; Chen, Wei; Zhou, Chen; Cao, Bingwei
2018-01-01
This paper proposes an ontology-based fault diagnosis method which overcomes the difficulty of understanding complex fault diagnosis knowledge of loaders and offers a universal approach for fault diagnosis of all loaders. This method contains the following components: (1) An ontology-based fault diagnosis model is proposed to achieve the integrating, sharing and reusing of fault diagnosis knowledge for loaders; (2) combined with ontology, CBR (case-based reasoning) is introduced to realize effective and accurate fault diagnoses following four steps (feature selection, case-retrieval, case-matching and case-updating); and (3) in order to cover the shortages of the CBR method due to the lack of concerned cases, ontology based RBR (rule-based reasoning) is put forward through building SWRL (Semantic Web Rule Language) rules. An application program is also developed to implement the above methods to assist in finding the fault causes, fault locations and maintenance measures of loaders. In addition, the program is validated through analyzing a case study. PMID:29495646
Interim analysis: A rational approach of decision making in clinical trial.
Kumar, Amal; Chakraborty, Bhaswat S
2016-01-01
Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-09-01
Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less
Terrestrial gravity data analysis for interim gravity model improvement
NASA Technical Reports Server (NTRS)
1987-01-01
This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.
MIRAP, microcomputer reliability analysis program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jehee, J.N.T.
1989-01-01
A program for a microcomputer is outlined that can determine minimal cut sets from a specified fault tree logic. The speed and memory limitations of the microcomputers on which the program is implemented (Atari ST and IBM) are addressed by reducing the fault tree's size and by storing the cut set data on disk. Extensive well proven fault tree restructuring techniques, such as the identification of sibling events and of independent gate events, reduces the fault tree's size but does not alter its logic. New methods are used for the Boolean reduction of the fault tree logic. Special criteria formore » combining events in the 'AND' and 'OR' logic avoid the creation of many subsuming cut sets which all would cancel out due to existing cut sets. Figures and tables illustrates these methods. 4 refs., 5 tabs.« less
Wheel/Rail Noise and Vibration Control
DOT National Transportation Integrated Search
1974-05-01
Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...
Evaluation of experimental flexible pavements : interim report no. 2.
DOT National Transportation Integrated Search
1975-01-01
A program of construction and performance evaluation of seven Virginia flexible pavements containing at least some experimental features is reported. The objective of the program is to evaluate the performance of the pavements incorporating new or ti...
NASA Astrophysics Data System (ADS)
Yim, Keun Soo
This dissertation summarizes experimental validation and co-design studies conducted to optimize the fault detection capabilities and overheads in hybrid computer systems (e.g., using CPUs and Graphics Processing Units, or GPUs), and consequently to improve the scalability of parallel computer systems using computational accelerators. The experimental validation studies were conducted to help us understand the failure characteristics of CPU-GPU hybrid computer systems under various types of hardware faults. The main characterization targets were faults that are difficult to detect and/or recover from, e.g., faults that cause long latency failures (Ch. 3), faults in dynamically allocated resources (Ch. 4), faults in GPUs (Ch. 5), faults in MPI programs (Ch. 6), and microarchitecture-level faults with specific timing features (Ch. 7). The co-design studies were based on the characterization results. One of the co-designed systems has a set of source-to-source translators that customize and strategically place error detectors in the source code of target GPU programs (Ch. 5). Another co-designed system uses an extension card to learn the normal behavioral and semantic execution patterns of message-passing processes executing on CPUs, and to detect abnormal behaviors of those parallel processes (Ch. 6). The third co-designed system is a co-processor that has a set of new instructions in order to support software-implemented fault detection techniques (Ch. 7). The work described in this dissertation gains more importance because heterogeneous processors have become an essential component of state-of-the-art supercomputers. GPUs were used in three of the five fastest supercomputers that were operating in 2011. Our work included comprehensive fault characterization studies in CPU-GPU hybrid computers. In CPUs, we monitored the target systems for a long period of time after injecting faults (a temporally comprehensive experiment), and injected faults into various types of program states that included dynamically allocated memory (to be spatially comprehensive). In GPUs, we used fault injection studies to demonstrate the importance of detecting silent data corruption (SDC) errors that are mainly due to the lack of fine-grained protections and the massive use of fault-insensitive data. This dissertation also presents transparent fault tolerance frameworks and techniques that are directly applicable to hybrid computers built using only commercial off-the-shelf hardware components. This dissertation shows that by developing understanding of the failure characteristics and error propagation paths of target programs, we were able to create fault tolerance frameworks and techniques that can quickly detect and recover from hardware faults with low performance and hardware overheads.
Physics 200, 300 Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide, developed for the physics 200, 300 program in Manitoba, is designed to articulate with previous science courses; provide concepts, processes, and skills which will enable students to continue in physics-related areas; and relate physics to practical applications in everyday life. It includes a program overview (with program goals and…
Chemistry 200, 300 Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide, developed for the chemistry 200, 300 program in Manitoba, is designed to articulate with previous science courses, provide concepts, processes, and skills which will enable students to continue in chemistry-related areas, and relate chemistry to practical applications in everyday life. It includes a program overview (with program goals…
75 FR 39859 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...
76 FR 47476 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-05
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...
Linear Programming for Vocational Education Planning. Interim Report.
ERIC Educational Resources Information Center
Young, Robert C.; And Others
The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…
Diagnostics Tools Identify Faults Prior to Failure
NASA Technical Reports Server (NTRS)
2013-01-01
Through the SBIR program, Rochester, New York-based Impact Technologies LLC collaborated with Ames Research Center to commercialize the Center s Hybrid Diagnostic Engine, or HyDE, software. The fault detecting program is now incorporated into a software suite that identifies potential faults early in the design phase of systems ranging from printers to vehicles and robots, saving time and money.
Examples of Nonconservatism in the CARE 3 Program
NASA Technical Reports Server (NTRS)
Dotson, Kelly J.
1988-01-01
This paper presents parameter regions in the CARE 3 (Computer-Aided Reliability Estimation version 3) computer program where the program overestimates the reliability of a modeled system without warning the user. Five simple models of fault-tolerant computer systems are analyzed; and, the parameter regions where reliability is overestimated are given. The source of the error in the reliability estimates for models which incorporate transient fault occurrences was not readily apparent. However, the source of much of the error for models with permanent and intermittent faults can be attributed to the choice of values for the run-time parameters of the program.
Certification of computational results
NASA Technical Reports Server (NTRS)
Sullivan, Gregory F.; Wilson, Dwight S.; Masson, Gerald M.
1993-01-01
A conceptually novel and powerful technique to achieve fault detection and fault tolerance in hardware and software systems is described. When used for software fault detection, this new technique uses time and software redundancy and can be outlined as follows. In the initial phase, a program is run to solve a problem and store the result. In addition, this program leaves behind a trail of data called a certification trail. In the second phase, another program is run which solves the original problem again. This program, however, has access to the certification trail left by the first program. Because of the availability of the certification trail, the second phase can be performed by a less complex program and can execute more quickly. In the final phase, the two results are compared and if they agree the results are accepted as correct; otherwise an error is indicated. An essential aspect of this approach is that the second program must always generate either an error indication or a correct output even when the certification trail it receives from the first program is incorrect. The certification trail approach to fault tolerance is formalized and realizations of it are illustrated by considering algorithms for the following problems: convex hull, sorting, and shortest path. Cases in which the second phase can be run concurrently with the first and act as a monitor are discussed. The certification trail approach are compared to other approaches to fault tolerance.
Injecting Artificial Memory Errors Into a Running Computer Program
NASA Technical Reports Server (NTRS)
Bornstein, Benjamin J.; Granat, Robert A.; Wagstaff, Kiri L.
2008-01-01
Single-event upsets (SEUs) or bitflips are computer memory errors caused by radiation. BITFLIPS (Basic Instrumentation Tool for Fault Localized Injection of Probabilistic SEUs) is a computer program that deliberately injects SEUs into another computer program, while the latter is running, for the purpose of evaluating the fault tolerance of that program. BITFLIPS was written as a plug-in extension of the open-source Valgrind debugging and profiling software. BITFLIPS can inject SEUs into any program that can be run on the Linux operating system, without needing to modify the program s source code. Further, if access to the original program source code is available, BITFLIPS offers fine-grained control over exactly when and which areas of memory (as specified via program variables) will be subjected to SEUs. The rate of injection of SEUs is controlled by specifying either a fault probability or a fault rate based on memory size and radiation exposure time, in units of SEUs per byte per second. BITFLIPS can also log each SEU that it injects and, if program source code is available, report the magnitude of effect of the SEU on a floating-point value or other program variable.
Evaluation of the Implementation of the Rural and Low-Income School (RLIS) Program: Interim Report
ERIC Educational Resources Information Center
Magill, Kathleen; Reeves, Cynthia; Hallberg, Kelly; Hinojosa, Trisha
2009-01-01
The Rural and Low-Income School (RLIS) program is part of the Rural Education Achievement Program (REAP) that was authorized under Title VI, Part B of the "Elementary and Secondary Act of 1965" ("ESEA"), as amended by the "No Child Left Behind Act of 2001" ("NCLB"). The RLIS program provides additional funds…
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
Measurement of fault latency in a digital avionic mini processor, part 2
NASA Technical Reports Server (NTRS)
Mcgough, J.; Swern, F.
1983-01-01
The results of fault injection experiments utilizing a gate-level emulation of the central processor unit of the Bendix BDX-930 digital computer are described. Several earlier programs were reprogrammed, expanding the instruction set to capitalize on the full power of the BDX-930 computer. As a final demonstration of fault coverage an extensive, 3-axis, high performance flght control computation was added. The stages in the development of a CPU self-test program emphasizing the relationship between fault coverage, speed, and quantity of instructions were demonstrated.
Software For Fault-Tree Diagnosis Of A System
NASA Technical Reports Server (NTRS)
Iverson, Dave; Patterson-Hine, Ann; Liao, Jack
1993-01-01
Fault Tree Diagnosis System (FTDS) computer program is automated-diagnostic-system program identifying likely causes of specified failure on basis of information represented in system-reliability mathematical models known as fault trees. Is modified implementation of failure-cause-identification phase of Narayanan's and Viswanadham's methodology for acquisition of knowledge and reasoning in analyzing failures of systems. Knowledge base of if/then rules replaced with object-oriented fault-tree representation. Enhancement yields more-efficient identification of causes of failures and enables dynamic updating of knowledge base. Written in C language, C++, and Common LISP.
2015-12-01
institutional review board (IRB)-approved sequence was established for Delphi panel participants. The collection of data from the Delphi panel...The following year, the Office of the Inspector General Audit Division within the U.S. Department of Justice (DOJ) released an interim report on the...iacp_uaguidelines.pdf 11 Department of Justice, Office of the Inspector General, Audit Division, Interim Report on the Department of Justice’s Use and Support of
Procedures for Computing Site Seismicity
1994-02-01
Fourth World Conference on Earthquake Engineering, Santiago, Chile , 1969. Schnabel, P.B., J. Lysmer, and H.B. Seed (1972). SHAKE, a computer program for...This fault system is composed of the Elsinore and Whittier fault zones, Agua Caliente fault, and Earthquake Valley fault. Five recent earthquakes of
Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)
NASA Technical Reports Server (NTRS)
Kenney, G. P.
1975-01-01
The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.
NASA Astrophysics Data System (ADS)
Goto, J.; Moriya, T.; Yoshimura, K.; Tsuchi, H.; Karasaki, K.; Onishi, T.; Ueta, K.; Tanaka, S.; Kiho, K.
2010-12-01
The Nuclear Waste Management Organization of Japan (NUMO), in collaboration with Lawrence Berkeley National Laboratory (LBNL), has carried out a project to develop an efficient and practical methodology to characterize hydrologic property of faults since 2007, exclusively for the early stage of siting a deep underground repository. A preliminary flowchart of the characterization program and a classification scheme of fault hydrology based on the geological feature have been proposed. These have been tested through the field characterization program on the Wildcat Fault in Berkeley, California. The Wildcat Fault is a relatively large non-active strike-slip fault which is believed to be a subsidiary of the active Hayward Fault. Our classification scheme assumes the contrasting hydrologic features between the linear northern part and the split/spread southern part of the Wildcat Fault. The field characterization program to date has been concentrated in and around the LBNL site on the southern part of the fault. Several lines of electrical and reflection seismic surveys, and subsequent trench investigations, have revealed the approximate distribution and near-surface features of the Wildcat Fault (see also Onishi, et al. and Ueta, et al.). Three 150m deep boreholes, WF-1 to WF-3, have been drilled on a line normal to the trace of the fault in the LBNL site. Two vertical holes were placed to characterize the undisturbed Miocene sedimentary formations at the eastern and western sides of the fault (WF-1 and WF-2 respectively). WF-2 on the western side intersected the rock formation, which was expected only in WF-1, and several of various intensities. Therefore, WF-3, originally planned as inclined to penetrate the fault, was replaced by the vertical hole further to the west. It again encountered unexpected rocks and faults. Preliminary results of in-situ hydraulic tests suggested that the transmissivity of WF-1 is ten to one hundred times higher than WF-2. The monitoring of hydraulic pressure displayed different head distribution patterns between WF-1 and WF-2 (see also Karasaki, et al.). Based on these results, three hypotheses on the distribution of the Wildcat Fault were proposed: (a) a vertical fault in between WF-1 and WF-2, (b) a more gently dipping fault intersected in WF-2 and WF-3, and (c) a wide zone of faults extending between WF-1 and WF-3. At present, WF-4, an inclined hole to penetrate the possible (eastern?) master fault, is ongoing to test these hypotheses. After the WF-4 investigation, hydrologic and geochemical analyses and modeling of the southern part of the fault will be carried out. A simpler field characterization program will also be carried out in the northern part of the fault. Finally, all the results will be synthesized to improve the comprehensive methodology.
77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...
78 FR 28953 - William D. Ford Federal Direct Loan Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... students since July 1, 2011. Second, the law placed a limit on Direct Subsidized Loan eligibility for new... students to complete their academic programs in a timely manner. Timely completion of programs will allow... student loan debt. This interim final rule implements the required statutory changes. Summary of the Major...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... SNDA was conducted. Larger proportions of elementary schools met the standards for total fat and... Certification of Compliance With Meal Requirements for the National School Lunch Program Under the Healthy.... SUMMARY: This interim rule amends National School Lunch Program regulations to conform to requirements...
ERIC Educational Resources Information Center
Jung, Steven M.; And Others
Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... System Supervision (PWSS) programs to meet the requirements of the Safe Drinking Water Act (SDWA). The State of Rhode Island has adopted drinking water regulations for the Arsenic Rule (66 FR 6976... adopted drinking water regulations for the Interim Enhanced Surface Water Treatment Rule (63 FR 69477...
76 FR 68116 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...
10 CFR 712.19 - Removal from HRP.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...
IVHS Countermeasures For Rear-End Collisions, Task 1 Volume I: Summary, Interim Report
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...] Competitive and Noncompetitive Nonformula Federal Assistance Programs--Administrative Provisions for Biomass..., without change, an interim rule containing a set of specific administrative requirements for the Biomass... Biomass Research and Development Initiative (BRDI) under which competitively awarded grants, contracts...
Reliability database development for use with an object-oriented fault tree evaluation program
NASA Technical Reports Server (NTRS)
Heger, A. Sharif; Harringtton, Robert J.; Koen, Billy V.; Patterson-Hine, F. Ann
1989-01-01
A description is given of the development of a fault-tree analysis method using object-oriented programming. In addition, the authors discuss the programs that have been developed or are under development to connect a fault-tree analysis routine to a reliability database. To assess the performance of the routines, a relational database simulating one of the nuclear power industry databases has been constructed. For a realistic assessment of the results of this project, the use of one of existing nuclear power reliability databases is planned.
PV Systems Reliability Final Technical Report: Ground Fault Detection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lavrova, Olga; Flicker, Jack David; Johnson, Jay
We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.
77 FR 52614 - Pre-Existing Condition Insurance Plan Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
...This document contains an amendment regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan program under provisions of the Patient Protection and Affordable Care Act. In light of a new process recently announced by the Department of Homeland Security, eligibility for the program is being amended so that the program does not inadvertently expand the scope of that process.
Discretized Streams: A Fault-Tolerant Model for Scalable Stream Processing
2012-12-14
Discretized Streams: A Fault-Tolerant Model for Scalable Stream Processing Matei Zaharia Tathagata Das Haoyuan Li Timothy Hunter Scott Shenker Ion...SUBTITLE Discretized Streams: A Fault-Tolerant Model for Scalable Stream Processing 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...time. However, current programming models for distributed stream processing are relatively low-level often leaving the user to worry about consistency of
Fault-Tolerant Control For A Robotic Inspection System
NASA Technical Reports Server (NTRS)
Tso, Kam Sing
1995-01-01
Report describes first phase of continuing program of research on fault-tolerant control subsystem of telerobotic visual-inspection system. Goal of program to develop robotic system for remotely controlled visual inspection of structures in outer space.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Almasi, Gheorghe; Blumrich, Matthias Augustin; Chen, Dong
Methods and apparatus perform fault isolation in multiple node computing systems using commutative error detection values for--example, checksums--to identify and to isolate faulty nodes. When information associated with a reproducible portion of a computer program is injected into a network by a node, a commutative error detection value is calculated. At intervals, node fault detection apparatus associated with the multiple node computer system retrieve commutative error detection values associated with the node and stores them in memory. When the computer program is executed again by the multiple node computer system, new commutative error detection values are created and stored inmore » memory. The node fault detection apparatus identifies faulty nodes by comparing commutative error detection values associated with reproducible portions of the application program generated by a particular node from different runs of the application program. Differences in values indicate a possible faulty node.« less
Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.
ERIC Educational Resources Information Center
Friedman, Myron; And Others
To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…
ERIC Educational Resources Information Center
Zhang, Yu; Chan, Tsze
2007-01-01
This report describes essential characteristics and key program outcome measures for the Student Support Services (SSS) program grantees and participants in reporting years 2002-03 and 2003-04. The SSS program is designed to increase college persistence and graduation rates for eligible students, increase the transfer rates of eligible students…
ERIC Educational Resources Information Center
Hale, Margaret Marcus; Chan, Tsze
2006-01-01
Created in 1972, the Educational Opportunity Centers (EOC) Program, one of eight TRIO Programs, funds EOC projects at two- and four-year colleges and universities and public or private agencies or organizations to assist adults from disadvantaged backgrounds to enter or continue a postsecondary education program. Participants in EOC projects…
Detection of faults and software reliability analysis
NASA Technical Reports Server (NTRS)
Knight, John C.
1987-01-01
Multi-version or N-version programming is proposed as a method of providing fault tolerance in software. The approach requires the separate, independent preparation of multiple versions of a piece of software for some application. These versions are executed in parallel in the application environment; each receives identical inputs and each produces its version of the required outputs. The outputs are collected by a voter and, in principle, they should all be the same. In practice there may be some disagreement. If this occurs, the results of the majority are taken to be the correct output, and that is the output used by the system. A total of 27 programs were produced. Each of these programs was then subjected to one million randomly-generated test cases. The experiment yielded a number of programs containing faults that are useful for general studies of software reliability as well as studies of N-version programming. Fault tolerance through data diversity and analytic models of comparison testing are discussed.
75 FR 30113 - Rural Microentrepreneur Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... government levels. Regulatory Flexibility Act This interim rule has been reviewed with regard to the... efforts to build the capacity of the microenterprise development industry to achieve new levels of... loan program level and legislative intent in the USDA FY 2010 appropriations bill. If this information...
75 FR 6839 - Technical Service Provider Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
16 CFR 1209.33 - Reasonable testing program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1209.33 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.33 Reasonable testing program. (a) General. Section 14(a) of the Consumer Product Safety Act (15 U.S.C. 2063(a)) requires each manufacturer...
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
76 FR 70639 - Agricultural Career and Employment Grants Program; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...
An evaluation of the short-term effects of the Virginia driver improvement program : interim report.
DOT National Transportation Integrated Search
1981-01-01
This study attempted to determine the impact of the driver improvement program on Virginia's traffic and safety environment in terms of accidents and traffic convictions averted as a result of appropriate treatment, and to establish an ongoing system...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE; ORNL; NREL
1999-10-15
The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NOx) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices formore » multiple levels of fuel sulfur content. This interim report discusses the results of the DECSE test program that demonstrates the potential of NOx adsorber catalyst technology across the range of diesel engine operation with a fuel economy penalty less than 4%.« less
Experiments in fault tolerant software reliability
NASA Technical Reports Server (NTRS)
Mcallister, David F.; Vouk, Mladen A.
1989-01-01
Twenty functionally equivalent programs were built and tested in a multiversion software experiment. Following unit testing, all programs were subjected to an extensive system test. In the process sixty-one distinct faults were identified among the versions. Less than 12 percent of the faults exhibited varying degrees of positive correlation. The common-cause (or similar) faults spanned as many as 14 components. However, a majority of these faults were trivial, and easily detected by proper unit and/or system testing. Only two of the seven similar faults were difficult faults, and both were caused by specification ambiguities. One of these faults exhibited variable identical-and-wrong response span, i.e. response span which varied with the testing conditions and input data. Techniques that could have been used to avoid the faults are discussed. For example, it was determined that back-to-back testing of 2-tuples could have been used to eliminate about 90 percent of the faults. In addition, four of the seven similar faults could have been detected by using back-to-back testing of 5-tuples. It is believed that most, if not all, similar faults could have been avoided had the specifications been written using more formal notation, the unit testing phase was subject to more stringent standards and controls, and better tools for measuring the quality and adequacy of the test data (e.g. coverage) were used.
ERIC Educational Resources Information Center
Forest, Jan
The Integrated Occupational Program (IOP) was designed for students in grades 8-12 who have experienced prolonged difficulty with the regular elementary and secondary school programs, who demonstrate a significant lag in one or more of their academic courses, and who typically fall into the intelligence band of 75-95 IQ. The IOP enables students…
Work Experience Program Teacher Resource Manual. Junior and Senior High School. Interim Edition.
ERIC Educational Resources Information Center
Gullekson, Dale
This manual has been prepared to help educators in Alberta, Canada, organize and operate a work experience program that provides meaningful learning experiences for junior and senior high school students in partnership with the community. The manual: (1) outlines the expectations of the work experience program, including benefits to students,…
Harvard University Program on Technology and Society 1964-1972. A Final Review.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Program on Technology and Society.
Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Busbey, A.B.
Seismic Processing Workshop, a program by Parallel Geosciences of Austin, TX, is discussed in this column. The program is a high-speed, interactive seismic processing and computer analysis system for the Apple Macintosh II family of computers. Also reviewed in this column are three products from Wilkerson Associates of Champaign, IL. SubSide is an interactive program for basin subsidence analysis; MacFault and MacThrustRamp are programs for modeling faults.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less
2013-10-03
: In the fiscal year (FY) 2014 inpatient prospective payment systems (IPPS)/long-term care hospital (LTCH) PPS final rule, we established the methodology for determining the amount of uncompensated care payments made to hospitals eligible for the disproportionate share hospital (DSH) payment adjustment in FY 2014 and a process for making interim and final payments. This interim final rule with comment period revises certain operational considerations for hospitals with Medicare cost reporting periods that span more than one Federal fiscal year and also makes changes to the data that will be used in the uncompensated care payment calculation in order to ensure that data from Indian Health Service (IHS) hospitals are included in Factor 1 and Factor 3 of that calculation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
The atmospheric effects of stratospheric aircraft: A fourth program report
NASA Technical Reports Server (NTRS)
Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor); Wofsy, Steven C.; Ravishankara, A. R.; Rodriguez, Jose M.; Grose, William L.
1995-01-01
This document presents the fourth report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP). Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent AESA interim assessment report and a review of that report have shown that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA has been designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This fourth report comes after the interim assessment and sets forth directions for the 1995 assessment at the end of AESA Phase 1. It also sets forth the goals and directions for AESA Phase 2, as reported at the 1994 Atmospheric Effects of Aviation Project (AEAP) annual meeting held in June. The focus of the Phase 2 effort is to obtain the best possible closure on the outstanding problems identified in the interim assessment and NASA/NRC review. Topics discussed in this report include how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements.
76 FR 41411 - West Virginia Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... of Environmental Protection (WVDEP). The interim rule provided an opportunity for public comment and... 30 CFR Part 948 Intergovernmental relations, Surface mining, Underground mining. Dated: July 5, 2011...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus
A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.
Interim Report on the Truancy Court Diversion Program in the District of Columbia, 2011-12
ERIC Educational Resources Information Center
Cahill, Meagan; Liberman, Akiva; Cramer, Lindsey
2012-01-01
The Truancy Court Diversion Program (TCDP) is a voluntary program for at risk students and their parents. It combines involvement of a Family Court judge in group and individual sessions with service provision. During the 2011-12 school year, a pilot TCDP was implemented at Kramer Middle School (M.S.) and at Johnson M.S. The program attempts to…
ERIC Educational Resources Information Center
Searcy, Ellen Ouhl
The main objectives of this report about the Federal effort in early learning research are to assist the National Program on Early Childhood Education (NPECE) in planning its research and development program, to identify predicted "popular" areas of research for the future, and to identify possible NPECE funding sources. The report…
Using certification trails to achieve software fault tolerance
NASA Technical Reports Server (NTRS)
Sullivan, Gregory F.; Masson, Gerald M.
1993-01-01
A conceptually novel and powerful technique to achieve fault tolerance in hardware and software systems is introduced. When used for software fault tolerance, this new technique uses time and software redundancy and can be outlined as follows. In the initial phase, a program is run to solve a problem and store the result. In addition, this program leaves behind a trail of data called a certification trail. In the second phase, another program is run which solves the original problem again. This program, however, has access to the certification trail left by the first program. Because of the availability of the certification trail, the second phase can be performed by a less complex program and can execute more quickly. In the final phase, the two results are accepted as correct; otherwise an error is indicated. An essential aspect of this approach is that the second program must always generate either an error indication or a correct output even when the certification trail it receives from the first program is incorrect. The certification trail approach to fault tolerance was formalized and it was illustrated by applying it to the fundamental problem of finding a minimum spanning tree. Cases in which the second phase can be run concorrectly with the first and act as a monitor are discussed. The certification trail approach was compared to other approaches to fault tolerance. Because of space limitations we have omitted examples of our technique applied to the Huffman tree, and convex hull problems. These can be found in the full version of this paper.
Object-oriented fault tree evaluation program for quantitative analyses
NASA Technical Reports Server (NTRS)
Patterson-Hine, F. A.; Koen, B. V.
1988-01-01
Object-oriented programming can be combined with fault free techniques to give a significantly improved environment for evaluating the safety and reliability of large complex systems for space missions. Deep knowledge about system components and interactions, available from reliability studies and other sources, can be described using objects that make up a knowledge base. This knowledge base can be interrogated throughout the design process, during system testing, and during operation, and can be easily modified to reflect design changes in order to maintain a consistent information source. An object-oriented environment for reliability assessment has been developed on a Texas Instrument (TI) Explorer LISP workstation. The program, which directly evaluates system fault trees, utilizes the object-oriented extension to LISP called Flavors that is available on the Explorer. The object representation of a fault tree facilitates the storage and retrieval of information associated with each event in the tree, including tree structural information and intermediate results obtained during the tree reduction process. Reliability data associated with each basic event are stored in the fault tree objects. The object-oriented environment on the Explorer also includes a graphical tree editor which was modified to display and edit the fault trees.
System and method of detecting cavitation in pumps
Lu, Bin; Sharma, Santosh Kumar; Yan, Ting; Dimino, Steven A.
2017-10-03
A system and method for detecting cavitation in pumps for fixed and variable supply frequency applications is disclosed. The system includes a controller having a processor programmed to repeatedly receive real-time operating current data from a motor driving a pump, generate a current frequency spectrum from the current data, and analyze current data within a pair of signature frequency bands of the current frequency spectrum. The processor is further programmed to repeatedly determine fault signatures as a function of the current data within the pair of signature frequency bands, repeatedly determine fault indices based on the fault signatures and a dynamic reference signature, compare the fault indices to a reference index, and identify a cavitation condition in a pump based on a comparison between the reference index and a current fault index.
Reliability computation using fault tree analysis
NASA Technical Reports Server (NTRS)
Chelson, P. O.
1971-01-01
A method is presented for calculating event probabilities from an arbitrary fault tree. The method includes an analytical derivation of the system equation and is not a simulation program. The method can handle systems that incorporate standby redundancy and it uses conditional probabilities for computing fault trees where the same basic failure appears in more than one fault path.
Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...
Satellite Academies Program: Interim Report.
ERIC Educational Resources Information Center
Center for Urban Education, New York, NY.
The Satellite Academies Program (SAP) is considered to have the following central goals: (1) to improve basic academic skills, (2) to provide meaningful work experience, (3) to develop a job-related educational curriculum, (4) to involve the business community in education, (5) to increase student involvement in the educational process, and (6) to…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... Verification Services Inc. as a Nationally Recognized Certification Program for Small Electric Motors AGENCY... conservation requirements for, among other things, electric motors and small electric motors, including test...\\ Section 345(c) of EPCA directs the Secretary of Energy to require manufacturers of electric motors ``to...
Second Interim Report of the Broadly-Based Community Study of Exceptional Education.
ERIC Educational Resources Information Center
Milwaukee Public Schools, WI. Div. of Curriculum and Instruction.
Presented are recommendations of a Milwaukee public school study for the purpose of providing a meaningful, effective, and comprehensive educational program for exceptional students. Fourteen recommendations covering the broad policy of exceptional education include policies on integration into normal school programs, transportation, and early…
78 FR 26504 - Women-Owned Small Business Federal Contract Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...
40 CFR 52.241 - Interim approval of enhanced inspection and maintenance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California... Act (Pub. L. 104-59), the California SIP is approved as meeting the provisions of section 182(c)(3.... (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision...
ERIC Educational Resources Information Center
Administration for Children, Youth, and Families (DHHS), Washington, DC. Head Start Bureau.
The Comprehensive Child Development Program (CCDP), enacted by Congress in 1988, provides intensive, comprehensive, integrated, and continuous support to preschool children from low-income families to enhance their intellectual, social, and physical development. It also provides needed services to parents and household family members to enhance…
Putting Data to Work: Interim Recommendations from The Benchmarking Project
ERIC Educational Resources Information Center
Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol
2010-01-01
As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…
The Development of a Vocational Diagnostic Program. Interim Report.
ERIC Educational Resources Information Center
Barnard, William W.
A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
77 FR 33662 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-07
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...
NASA Technical Reports Server (NTRS)
Brunelle, J. E.; Eckhardt, D. E., Jr.
1985-01-01
Results are presented of an experiment conducted in the NASA Avionics Integrated Research Laboratory (AIRLAB) to investigate the implementation of fault-tolerant software techniques on fault-tolerant computer architectures, in particular the Software Implemented Fault Tolerance (SIFT) computer. The N-version programming and recovery block techniques were implemented on a portion of the SIFT operating system. The results indicate that, to effectively implement fault-tolerant software design techniques, system requirements will be impacted and suggest that retrofitting fault-tolerant software on existing designs will be inefficient and may require system modification.
FTC - THE FAULT-TREE COMPILER (SUN VERSION)
NASA Technical Reports Server (NTRS)
Butler, R. W.
1994-01-01
FTC, the Fault-Tree Compiler program, is a tool used to calculate the top-event probability for a fault-tree. Five different gate types are allowed in the fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N. The high-level input language is easy to understand and use. In addition, the program supports a hierarchical fault tree definition feature which simplifies the tree-description process and reduces execution time. A rigorous error bound is derived for the solution technique. This bound enables the program to supply an answer precisely (within the limits of double precision floating point arithmetic) at a user-specified number of digits accuracy. The program also facilitates sensitivity analysis with respect to any specified parameter of the fault tree such as a component failure rate or a specific event probability by allowing the user to vary one failure rate or the failure probability over a range of values and plot the results. The mathematical approach chosen to solve a reliability problem may vary with the size and nature of the problem. Although different solution techniques are utilized on different programs, it is possible to have a common input language. The Systems Validation Methods group at NASA Langley Research Center has created a set of programs that form the basis for a reliability analysis workstation. The set of programs are: SURE reliability analysis program (COSMIC program LAR-13789, LAR-14921); the ASSIST specification interface program (LAR-14193, LAR-14923), PAWS/STEM reliability analysis programs (LAR-14165, LAR-14920); and the FTC fault tree tool (LAR-14586, LAR-14922). FTC is used to calculate the top-event probability for a fault tree. PAWS/STEM and SURE are programs which interpret the same SURE language, but utilize different solution methods. ASSIST is a preprocessor that generates SURE language from a more abstract definition. SURE, ASSIST, and PAWS/STEM are also offered as a bundle. Please see the abstract for COS-10039/COS-10041, SARA - SURE/ASSIST Reliability Analysis Workstation, for pricing details. FTC was originally developed for DEC VAX series computers running VMS and was later ported for use on Sun computers running SunOS. The program is written in PASCAL, ANSI compliant C-language, and FORTRAN 77. The TEMPLATE graphics library is required to obtain graphical output. The standard distribution medium for the VMS version of FTC (LAR-14586) is a 9-track 1600 BPI magnetic tape in VMSINSTAL format. It is also available on a TK50 tape cartridge in VMSINSTAL format. Executables are included. The standard distribution medium for the Sun version of FTC (LAR-14922) is a .25 inch streaming magnetic tape cartridge in UNIX tar format. Both Sun3 and Sun4 executables are included. FTC was developed in 1989 and last updated in 1992. DEC, VAX, VMS, and TK50 are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories. SunOS is a trademark of Sun Microsystems, Inc.
FTC - THE FAULT-TREE COMPILER (VAX VMS VERSION)
NASA Technical Reports Server (NTRS)
Butler, R. W.
1994-01-01
FTC, the Fault-Tree Compiler program, is a tool used to calculate the top-event probability for a fault-tree. Five different gate types are allowed in the fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N. The high-level input language is easy to understand and use. In addition, the program supports a hierarchical fault tree definition feature which simplifies the tree-description process and reduces execution time. A rigorous error bound is derived for the solution technique. This bound enables the program to supply an answer precisely (within the limits of double precision floating point arithmetic) at a user-specified number of digits accuracy. The program also facilitates sensitivity analysis with respect to any specified parameter of the fault tree such as a component failure rate or a specific event probability by allowing the user to vary one failure rate or the failure probability over a range of values and plot the results. The mathematical approach chosen to solve a reliability problem may vary with the size and nature of the problem. Although different solution techniques are utilized on different programs, it is possible to have a common input language. The Systems Validation Methods group at NASA Langley Research Center has created a set of programs that form the basis for a reliability analysis workstation. The set of programs are: SURE reliability analysis program (COSMIC program LAR-13789, LAR-14921); the ASSIST specification interface program (LAR-14193, LAR-14923), PAWS/STEM reliability analysis programs (LAR-14165, LAR-14920); and the FTC fault tree tool (LAR-14586, LAR-14922). FTC is used to calculate the top-event probability for a fault tree. PAWS/STEM and SURE are programs which interpret the same SURE language, but utilize different solution methods. ASSIST is a preprocessor that generates SURE language from a more abstract definition. SURE, ASSIST, and PAWS/STEM are also offered as a bundle. Please see the abstract for COS-10039/COS-10041, SARA - SURE/ASSIST Reliability Analysis Workstation, for pricing details. FTC was originally developed for DEC VAX series computers running VMS and was later ported for use on Sun computers running SunOS. The program is written in PASCAL, ANSI compliant C-language, and FORTRAN 77. The TEMPLATE graphics library is required to obtain graphical output. The standard distribution medium for the VMS version of FTC (LAR-14586) is a 9-track 1600 BPI magnetic tape in VMSINSTAL format. It is also available on a TK50 tape cartridge in VMSINSTAL format. Executables are included. The standard distribution medium for the Sun version of FTC (LAR-14922) is a .25 inch streaming magnetic tape cartridge in UNIX tar format. Both Sun3 and Sun4 executables are included. FTC was developed in 1989 and last updated in 1992. DEC, VAX, VMS, and TK50 are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories. SunOS is a trademark of Sun Microsystems, Inc.
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The Title II Higher Education Amendment (HEA) Partnership Grants Program provides grants to fund partnerships among colleges of education, schools of arts and sciences and local school districts in high-need areas. The goal of the program is to improve student achievement by increasing the quality of teachers. This evaluation examined the extent…
Interim user's manual for boundary layer integral matrix procedure, version J
NASA Technical Reports Server (NTRS)
Evans, R. M.; Morse, H. L.
1974-01-01
A computer program for analyzing two dimensional and axisymmetric nozzle performance with a variety of wall boundary conditions is described. The program has been developed for application to rocket nozzle problems. Several aids to usage of the program and two auxiliary subroutines are provided. Some features of the output are described and three sample cases are included.
ERIC Educational Resources Information Center
Weigel, Corina; Kokocinski, Kathrin; Lederer, Peter; Dotsch, Jorg; Rascher, Wolfgang; Knerr, Ina
2008-01-01
Objective: The authors performed a group-based program for obese children and adolescents in Bavaria, Germany to enable them to establish a health-oriented lifestyle and to reduce overweight. The authors compared this program with a control approach based on the patients' own initiative. Design: This is a controlled clinical trial. Setting: A…
National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.
ERIC Educational Resources Information Center
Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.
This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…
ERIC Educational Resources Information Center
Larson, Milton E.
This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less
NASA Technical Reports Server (NTRS)
Platt, M. E.; Lewis, E. E.; Boehm, F.
1991-01-01
A Monte Carlo Fortran computer program was developed that uses two variance reduction techniques for computing system reliability applicable to solving very large highly reliable fault-tolerant systems. The program is consistent with the hybrid automated reliability predictor (HARP) code which employs behavioral decomposition and complex fault-error handling models. This new capability is called MC-HARP which efficiently solves reliability models with non-constant failures rates (Weibull). Common mode failure modeling is also a specialty.
24 CFR 884.109 - Rent adjustments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... will be determined by HUD at least annually; interim revisions may be made as market conditions warrant...
Detection of faults and software reliability analysis
NASA Technical Reports Server (NTRS)
Knight, J. C.
1986-01-01
Multiversion or N-version programming was proposed as a method of providing fault tolerance in software. The approach requires the separate, independent preparation of multiple versions of a piece of software for some application. Specific topics addressed are: failure probabilities in N-version systems, consistent comparison in N-version systems, descriptions of the faults found in the Knight and Leveson experiment, analytic models of comparison testing, characteristics of the input regions that trigger faults, fault tolerance through data diversity, and the relationship between failures caused by automatically seeded faults.
Coordinated Fault Tolerance for High-Performance Computing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dongarra, Jack; Bosilca, George; et al.
2013-04-08
Our work to meet our goal of end-to-end fault tolerance has focused on two areas: (1) improving fault tolerance in various software currently available and widely used throughout the HEC domain and (2) using fault information exchange and coordination to achieve holistic, systemwide fault tolerance and understanding how to design and implement interfaces for integrating fault tolerance features for multiple layers of the software stack—from the application, math libraries, and programming language runtime to other common system software such as jobs schedulers, resource managers, and monitoring tools.
Implanted component faults and their effects on gas turbine engine performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacLeod, J.D.; Taylor, V.; Laflamme, J.C.G.
Under the sponsorship of the Canadian Department of National Defence, the Engine Laboratory of the National Research Council of Canada (NRCC) has established a program for the evaluation of component deterioration on gas turbine engine performance. The effect is aimed at investigating the effects of typical in-service faults on the performance characteristics of each individual engine component. The objective of the program is the development of a generalized fault library, which will be used with fault identification techniques in the field, to reduce unscheduled maintenance. To evaluate the effects of implanted faults on the performance of a single spool engine,more » such as an Allison T56 turboprop engine, a series of faulted parts were installed. For this paper the following faults were analyzed: (a) first-stage turbine nozzle erosion damage; (b) first-stage turbine rotor blade untwist; (c) compressor seal wear; (d) first and second-stage compressor blade tip clearance increase. This paper describes the project objectives, the experimental installation, and the results of the fault implantation on engine performance. Discussed are performance variations on both engine and component characteristics. As the performance changes were significant, a rigorous measurement uncertainty analysis is included.« less
2009-02-27
This notice announces the continuation of effectiveness of a Medicare interim final rule with comment period and the extension of the timeline for publication of the final rule. This notice is issued in accordance with section 1871(a)(3)(C) of the Social Security Act (the Act), which allows an interim final rule to remain in effect after the expiration of the timeline specified in section 1871(a)(3)(B) of the Act (the "regular timeline") or, if applicable, at the end of each succeeding 1-year extension to the regular timeline, if prior to the expiration of the timeline, the Secretary publishes in the Federal Register a notice of continuation and explains why the regular timeline or any subsequent extension was not complied with.
2010-01-13
The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.
Validation environment for AIPS/ALS: Implementation and results
NASA Technical Reports Server (NTRS)
Segall, Zary; Siewiorek, Daniel; Caplan, Eddie; Chung, Alan; Czeck, Edward; Vrsalovic, Dalibor
1990-01-01
The work is presented which was performed in porting the Fault Injection-based Automated Testing (FIAT) and Programming and Instrumentation Environments (PIE) validation tools, to the Advanced Information Processing System (AIPS) in the context of the Ada Language System (ALS) application, as well as an initial fault free validation of the available AIPS system. The PIE components implemented on AIPS provide the monitoring mechanisms required for validation. These mechanisms represent a substantial portion of the FIAT system. Moreover, these are required for the implementation of the FIAT environment on AIPS. Using these components, an initial fault free validation of the AIPS system was performed. The implementation is described of the FIAT/PIE system, configured for fault free validation of the AIPS fault tolerant computer system. The PIE components were modified to support the Ada language. A special purpose AIPS/Ada runtime monitoring and data collection was implemented. A number of initial Ada programs running on the PIE/AIPS system were implemented. The instrumentation of the Ada programs was accomplished automatically inside the PIE programming environment. PIE's on-line graphical views show vividly and accurately the performance characteristics of Ada programs, AIPS kernel and the application's interaction with the AIPS kernel. The data collection mechanisms were written in a high level language, Ada, and provide a high degree of flexibility for implementation under various system conditions.
Distributing Earthquakes Among California's Faults: A Binary Integer Programming Approach
NASA Astrophysics Data System (ADS)
Geist, E. L.; Parsons, T.
2016-12-01
Statement of the problem is simple: given regional seismicity specified by a Gutenber-Richter (G-R) relation, how are earthquakes distributed to match observed fault-slip rates? The objective is to determine the magnitude-frequency relation on individual faults. The California statewide G-R b-value and a-value are estimated from historical seismicity, with the a-value accounting for off-fault seismicity. UCERF3 consensus slip rates are used, based on geologic and geodetic data and include estimates of coupling coefficients. The binary integer programming (BIP) problem is set up such that each earthquake from a synthetic catalog spanning millennia can occur at any location along any fault. The decision vector, therefore, consists of binary variables, with values equal to one indicating the location of each earthquake that results in an optimal match of slip rates, in an L1-norm sense. Rupture area and slip associated with each earthquake are determined from a magnitude-area scaling relation. Uncertainty bounds on the UCERF3 slip rates provide explicit minimum and maximum constraints to the BIP model, with the former more important to feasibility of the problem. There is a maximum magnitude limit associated with each fault, based on fault length, providing an implicit constraint. Solution of integer programming problems with a large number of variables (>105 in this study) has been possible only since the late 1990s. In addition to the classic branch-and-bound technique used for these problems, several other algorithms have been recently developed, including pre-solving, sifting, cutting planes, heuristics, and parallelization. An optimal solution is obtained using a state-of-the-art BIP solver for M≥6 earthquakes and California's faults with slip-rates > 1 mm/yr. Preliminary results indicate a surprising diversity of on-fault magnitude-frequency relations throughout the state.
Semi-Markov adjunction to the Computer-Aided Markov Evaluator (CAME)
NASA Technical Reports Server (NTRS)
Rosch, Gene; Hutchins, Monica A.; Leong, Frank J.; Babcock, Philip S., IV
1988-01-01
The rule-based Computer-Aided Markov Evaluator (CAME) program was expanded in its ability to incorporate the effect of fault-handling processes into the construction of a reliability model. The fault-handling processes are modeled as semi-Markov events and CAME constructs and appropriate semi-Markov model. To solve the model, the program outputs it in a form which can be directly solved with the Semi-Markov Unreliability Range Evaluator (SURE) program. As a means of evaluating the alterations made to the CAME program, the program is used to model the reliability of portions of the Integrated Airframe/Propulsion Control System Architecture (IAPSA 2) reference configuration. The reliability predictions are compared with a previous analysis. The results bear out the feasibility of utilizing CAME to generate appropriate semi-Markov models to model fault-handling processes.
[The Application of the Fault Tree Analysis Method in Medical Equipment Maintenance].
Liu, Hongbin
2015-11-01
In this paper, the traditional fault tree analysis method is presented, detailed instructions for its application characteristics in medical instrument maintenance is made. It is made significant changes when the traditional fault tree analysis method is introduced into the medical instrument maintenance: gave up the logic symbolic, logic analysis and calculation, gave up its complicated programs, and only keep its image and practical fault tree diagram, and the fault tree diagram there are also differences: the fault tree is no longer a logical tree but the thinking tree in troubleshooting, the definition of the fault tree's nodes is different, the composition of the fault tree's branches is also different.
Usage of Fault Detection Isolation & Recovery (FDIR) in Constellation (CxP) Launch Operations
NASA Technical Reports Server (NTRS)
Ferrell, Rob; Lewis, Mark; Perotti, Jose; Oostdyk, Rebecca; Spirkovska, Lilly; Hall, David; Brown, Barbara
2010-01-01
This paper will explore the usage of Fault Detection Isolation & Recovery (FDIR) in the Constellation Exploration Program (CxP), in particular Launch Operations at Kennedy Space Center (KSC). NASA's Exploration Technology Development Program (ETDP) is currently funding a project that is developing a prototype FDIR to demonstrate the feasibility of incorporating FDIR into the CxP Ground Operations Launch Control System (LCS). An architecture that supports multiple FDIR tools has been formulated that will support integration into the CxP Ground Operation's Launch Control System (LCS). In addition, tools have been selected that provide fault detection, fault isolation, and anomaly detection along with integration between Flight and Ground elements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-09
This report summarizes the authors review and evaluation of the existing seismic hazards program at Los Alamos National Laboratory (LANL). The report recommends that the original program be augmented with a probabilistic analysis of seismic hazards involving assignment of weighted probabilities of occurrence to all potential sources. This approach yields a more realistic evaluation of the likelihood of large earthquake occurrence particularly in regions where seismic sources may have recurrent intervals of several thousand years or more. The report reviews the locations and geomorphic expressions of identified fault lines along with the known displacements of these faults and last knowmore » occurrence of seismic activity. Faults are mapped and categorized into by their potential for actual movement. Based on geologic site characterization, recommendations are made for increased seismic monitoring; age-dating studies of faults and geomorphic features; increased use of remote sensing and aerial photography for surface mapping of faults; the development of a landslide susceptibility map; and to develop seismic design standards for all existing and proposed facilities at LANL.« less
Evaluating and extending user-level fault tolerance in MPI applications
Laguna, Ignacio; Richards, David F.; Gamblin, Todd; ...
2016-01-11
The user-level failure mitigation (ULFM) interface has been proposed to provide fault-tolerant semantics in the Message Passing Interface (MPI). Previous work presented performance evaluations of ULFM; yet questions related to its programability and applicability, especially to non-trivial, bulk synchronous applications, remain unanswered. In this article, we present our experiences on using ULFM in a case study with a large, highly scalable, bulk synchronous molecular dynamics application to shed light on the advantages and difficulties of this interface to program fault-tolerant MPI applications. We found that, although ULFM is suitable for master–worker applications, it provides few benefits for more common bulkmore » synchronous MPI applications. Furthermore, to address these limitations, we introduce a new, simpler fault-tolerant interface for complex, bulk synchronous MPI programs with better applicability and support than ULFM for application-level recovery mechanisms, such as global rollback.« less
Algorithm-Based Fault Tolerance for Numerical Subroutines
NASA Technical Reports Server (NTRS)
Tumon, Michael; Granat, Robert; Lou, John
2007-01-01
A software library implements a new methodology of detecting faults in numerical subroutines, thus enabling application programs that contain the subroutines to recover transparently from single-event upsets. The software library in question is fault-detecting middleware that is wrapped around the numericalsubroutines. Conventional serial versions (based on LAPACK and FFTW) and a parallel version (based on ScaLAPACK) exist. The source code of the application program that contains the numerical subroutines is not modified, and the middleware is transparent to the user. The methodology used is a type of algorithm- based fault tolerance (ABFT). In ABFT, a checksum is computed before a computation and compared with the checksum of the computational result; an error is declared if the difference between the checksums exceeds some threshold. Novel normalization methods are used in the checksum comparison to ensure correct fault detections independent of algorithm inputs. In tests of this software reported in the peer-reviewed literature, this library was shown to enable detection of 99.9 percent of significant faults while generating no false alarms.
76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...
Project PRIME. Interim Report Year One 1971-1972 (Purpose and Procedures).
ERIC Educational Resources Information Center
Kaufman, Martin J.; And Others
Project PRIME (Programmed Re-Entry Into Mainstream Education) is concerned with evaluating the effectiveness of programs that aim at integration of handicapped children into regular classrooms. The main goals of the project are to determine which handicapped children can benefit from integration and under which conditions would it prove the most…
This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
ERIC Educational Resources Information Center
Greenberg, David; Verma, Nandita; Dillman, Keri-Nicole; Chaskin, Robert
2010-01-01
Distressed urban neighborhoods face challenges on multiple fronts, but most efforts to confront these problems work in isolation of one another. The New Communities Program (NCP) is an exception, helping selected Chicago neighborhoods develop partnerships to address challenges involving employment, education, housing, and safety in a…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Register on February 18, 2011, announcing the availability for public comment of draft Land-Based Wind... Guidelines are intended to supersede the Service's 2003 voluntary, interim guidelines for land-based wind...
Upward Bound Math-Science: Program Description and Interim Impact Estimates
ERIC Educational Resources Information Center
Olsen, Robert; Seftor, Neil; Silva, Tim; Myers, David; DesRoches, David; Young, Julie
2007-01-01
To help address continuing disparities in academic achievement and under-representation of disadvantaged groups in math and science majors and careers, the U.S. Department of Education (ED) established a math and science initiative in 1990 within Upward Bound, a federal grant program known as Upward Bound Math-Science (UBMS) designed to provide…
Federal Programs Supporting Educational Change, Vol. 2: Factors Affecting Change Agent Projects.
ERIC Educational Resources Information Center
Berman, Paul; Pauly, Edward W.
This second volume in the change-agent series reports the interim results of an exploratory statistical analysis of a survey of a nationwide sample of 293 change-agent projects funded by four federal demonstration programs--Elementary Secondary Education Act (ESEA) Title III, Innovative Projects; ESEA Title VII, Bilingual Projects; Vocational…
76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...
Embarking on College and Career: Interim Evaluation of Urban Alliance. Research Report
ERIC Educational Resources Information Center
Theodos, Brett; Pergamit, Michael R.; Hanson, Devlin; Edelstein, Sara; Daniels, Rebecca
2016-01-01
Urban Alliance serves at-risk youth through its high school internship program, which provides training, mentoring, and work experience to high school seniors from distressed communities. The program aims to help youth move on to higher education or employment after graduation. The Urban Institute is conducting a six-year, randomized controlled…
ERIC Educational Resources Information Center
O'Regan, Fred; Conway, Maureen
The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…
40 CFR 96.284 - Opt-in process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...
Home Start Evaluation Study. Interim Case Studies IIa.
ERIC Educational Resources Information Center
Fein, Robert
This formative evaluation study of Home Start uses a case study approach. A brief case study focuses on the administrative structure and staff resources and responsibilities of National Home Start. Also included are reports on seven local programs developed after two field visits had been made to each program. In the first visit, objectives chosen…
DOT National Transportation Integrated Search
1982-01-01
This study sought to evaluate the impact of the four basic treatment combinations of the rehabilitation component of the Virginia driver improvement program. It was found that receipt of a warning letter from the Division of Motor Vehicles had no eff...
ERIC Educational Resources Information Center
Behr, Shirley K.; And Others
The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…
EPA issues interim final waste minimization guidance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergeson, L.L.
1993-08-01
The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and tomore » owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.« less
NASA Space Flight Vehicle Fault Isolation Challenges
NASA Technical Reports Server (NTRS)
Bramon, Christopher; Inman, Sharon K.; Neeley, James R.; Jones, James V.; Tuttle, Loraine
2016-01-01
The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.
IVHS Architecture Development Program, Interim Status Report
DOT National Transportation Integrated Search
1994-04-01
A MAJOR NATIONAL INITIATIVE IS UNDERWAY TO APPLY PROVEN INFORMATION, COMMUNICATIONS AND CONTROL TECHNOLOGIES TO SURFACE TRANSPORTATION TO IMPROVE ITS EFFICIENCY AND REDUCE ITS NEGATIVE IMPACTS. COLLECTIVELY, THESE APPLICATIONS ARE KNOWN AS INTELLIGEN...
ERIC Educational Resources Information Center
Meaders, O. Donald, Ed.; Ekpo-ufot, Abel, Ed.
The Shared-Time Concept project was one of several projects conducted under a grant for a developmental vocational education research and teacher education program based on a clinical school concept. The objectives were (1) to determine the extent and nature of use of shared-time concept for conducting vocational education programs, and (2) to…
2016-12-15
In 2011 and 2012, the Secretary, Department of Health and Human Services (HHS), promulgated regulations designed to govern the World Trade Center (WTC) Health Program (Program), including the processes by which eligible responders and survivors may apply for enrollment in the Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions, as well as a process to add new conditions to the List of WTC-Related Health Conditions (List). After using the regulations for a number of years, the Administrator of the WTC Health Program identified potential improvements to certain existing provisions, including, but not limited to, appeals of enrollment, certification, and treatment decisions, as well as the procedures for the addition of health conditions for WTC Health Program coverage. He also identified the need to add new regulatory provisions, including, but not limited to, standards for the disenrollment of a WTC Health Program member and decertification of a certified WTC-related health condition. A notice of proposed rulemaking was published on August 17, 2016; this action addresses public comments received on that proposed rulemaking, as well as three interim final rules promulgated since 2011, and finalizes the proposed rule and three interim final rules.
A longitudinal medical Spanish program at one US medical school.
Reuland, Daniel S; Frasier, Pamela Y; Slatt, Lisa M; Alemán, Marco A
2008-07-01
Policymakers have recommended recruiting or training (or both) more US physicians who can provide care in Spanish. Few longitudinal medical Spanish programs have been described and evaluated. This study aims to describe development and evaluation of the preclinical phase of a 4-y program designed to graduate physicians who can provide language-concordant care in Spanish. Study was done in one public medical school in southeastern USA. The program targeted intermediate/advanced Spanish speakers. Standardized fluency assessments were used to determine eligibility and evaluate participants' progress. Curriculum included didactic coursework, simulated patients, socio-cultural seminars, clinical skills rotations at sites serving Latinos, service-learning, and international immersion. For the first two cohorts (n = 45) qualitative evaluation identified program improvement opportunities and found participants believed the program helped them maintain their Spanish skills. Mean interim (2-y) speaking proficiency scores were unchanged from baseline: 9.0 versus 8.7 at baseline on 12-point scale (p = 0.15). Mean interim listening comprehension scores (second cohort only, n = 25) increased from a baseline of 77 to 86% (p = 0.003). Proportions "passing" the listening comprehension test increased from 72 to 92% (p = 0.06). We describe development of a longitudinal Spanish program within a medical school. Participation was associated with improved Spanish listening comprehension and no change in speaking proficiency.
Software for determining the true displacement of faults
NASA Astrophysics Data System (ADS)
Nieto-Fuentes, R.; Nieto-Samaniego, Á. F.; Xu, S.-S.; Alaniz-Álvarez, S. A.
2014-03-01
One of the most important parameters of faults is the true (or net) displacement, which is measured by restoring two originally adjacent points, called “piercing points”, to their original positions. This measurement is not typically applicable because it is rare to observe piercing points in natural outcrops. Much more common is the measurement of the apparent displacement of a marker. Methods to calculate the true displacement of faults using descriptive geometry, trigonometry or vector algebra are common in the literature, and most of them solve a specific situation from a large amount of possible combinations of the fault parameters. True displacements are not routinely calculated because it is a tedious and tiring task, despite their importance and the relatively simple methodology. We believe that the solution is to develop software capable of performing this work. In a previous publication, our research group proposed a method to calculate the true displacement of faults by solving most combinations of fault parameters using simple trigonometric equations. The purpose of this contribution is to present a computer program for calculating the true displacement of faults. The input data are the dip of the fault; the pitch angles of the markers, slickenlines and observation lines; and the marker separation. To prevent the common difficulties involved in switching between operative systems, the software is developed using the Java programing language. The computer program could be used as a tool in education and will also be useful for the calculation of the true fault displacement in geological and engineering works. The application resolves the cases with known direction of net slip, which commonly is assumed parallel to the slickenlines. This assumption is not always valid and must be used with caution, because the slickenlines are formed during a step of the incremental displacement on the fault surface, whereas the net slip is related to the finite slip.
Study of a phase-to-ground fault on a 400 kV overhead transmission line
NASA Astrophysics Data System (ADS)
Iagăr, A.; Popa, G. N.; Diniş, C. M.
2018-01-01
Power utilities need to supply their consumers at high power quality level. Because the faults that occur on High-Voltage and Extra-High-Voltage transmission lines can cause serious damages in underlying transmission and distribution systems, it is important to examine each fault in detail. In this work we studied a phase-to-ground fault (on phase 1) of 400 kV overhead transmission line Mintia-Arad. Indactic® 650 fault analyzing system was used to record the history of the fault. Signals (analog and digital) recorded by Indactic® 650 were visualized and analyzed by Focus program. Summary of fault report allowed evaluation of behavior of control and protection equipment and determination of cause and location of the fault.
All-to-all sequenced fault detection system
Archer, Charles Jens; Pinnow, Kurt Walter; Ratterman, Joseph D.; Smith, Brian Edward
2010-11-02
An apparatus, program product and method enable nodal fault detection by sequencing communications between all system nodes. A master node may coordinate communications between two slave nodes before sequencing to and initiating communications between a new pair of slave nodes. The communications may be analyzed to determine the nodal fault.
Interim Enforcement Program Response Guidance to Public Data Access Issues
Written to assist EPA and states when the ECHO web site was launched, this document provides guidance on questions that can arise when compliance and enforcement data are made available to the public.
76 FR 22802 - Interim Enforcement Policy for Minimum Days Off Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... NRC's fitness for duty regulations and will remain in place until the NRC publishes a revised rule... Code of Federal Regulations, Part 26, ``Fitness for Duty Programs.'' The Commission updated the...
Evaluation of reliability modeling tools for advanced fault tolerant systems
NASA Technical Reports Server (NTRS)
Baker, Robert; Scheper, Charlotte
1986-01-01
The Computer Aided Reliability Estimation (CARE III) and Automated Reliability Interactice Estimation System (ARIES 82) reliability tools for application to advanced fault tolerance aerospace systems were evaluated. To determine reliability modeling requirements, the evaluation focused on the Draper Laboratories' Advanced Information Processing System (AIPS) architecture as an example architecture for fault tolerance aerospace systems. Advantages and limitations were identified for each reliability evaluation tool. The CARE III program was designed primarily for analyzing ultrareliable flight control systems. The ARIES 82 program's primary use was to support university research and teaching. Both CARE III and ARIES 82 were not suited for determining the reliability of complex nodal networks of the type used to interconnect processing sites in the AIPS architecture. It was concluded that ARIES was not suitable for modeling advanced fault tolerant systems. It was further concluded that subject to some limitations (the difficulty in modeling systems with unpowered spare modules, systems where equipment maintenance must be considered, systems where failure depends on the sequence in which faults occurred, and systems where multiple faults greater than a double near coincident faults must be considered), CARE III is best suited for evaluating the reliability of advanced tolerant systems for air transport.
ERIC Educational Resources Information Center
National Archives and Records Administration, 2006
2006-01-01
The Secretary is adopting as final, with changes, interim final regulations in: 34 CFR part 691 for the Academic Competitiveness Grant (ACG) and National Science and Mathematics Access to Retain Talent Grant (National SMART Grant) programs; 34 CFR part 668 (Student Assistance General Provisions); and 34 CFR part 690 (Federal Pell Grant Program).…
ERIC Educational Resources Information Center
Walker, Robert W.; Hemp, Paul E.
A study was made of Phase 1 of the long-term standards program for agricultural occupations programs for Illinois community colleges. The unique feature of this project was the procedure used to maximize the input of community college teachers in the validation and revision of the national standards. Survey instruments were sent to community…
Project Physics Programmed Instruction, Vectors 1.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first in a series of three booklets on vectors and covers the definitions of vectors and scalars, drawing vector quantities to scale, and negative vectors. For others in this series, see SE 015 550 and SE 015…
Project Physics Programmed Instruction, Waves 1.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first of two booklets on the topic of waves and covers pulses, how pulses travel, and what happens when two pulses pass through the same region at the same time. For the second booklet in this series, see SE…
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
This planning and instructional manual is designed to assist teachers in implementing the 20 10-credit-hour courses that make up the 26-level occupational component of the Integrated Occupational Program (IOP) in Alberta, Canada. (The IOP was developed to assist students who experience difficulties in secondary education and to help students make…
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.
This document contains materials for teachers to use in presenting the community health strand of the career and technology studies (CTS) program that has been approved for secondary schools in Alberta, Canada. The first three sections outline the philosophy/rationale, organization, and curriculum and assessment standards of the CTS program in…
Career Potential Among ROTC Enrollees: A Comparison of 1972 and 1973 Survey Results. Interim Report.
ERIC Educational Resources Information Center
Fisher, Allan H., Jr.; And Others
This document presents the results of a comprehensive 1973 Reserve Officer Training Program (ROTC) survey of enrollment potential and career potential for a variety of college-based military officer training programs. It indicates the extent of career motivation among 1973 enrollees and makes comparisons with a similar survey of 1972 enrollees.…
ERIC Educational Resources Information Center
German, Carl, Jr.
The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…
ERIC Educational Resources Information Center
Greene-McIntyre, Mary; Finch, Mary Hayes; Searcy, John
2003-01-01
An Alabama initiative aimed to improve access to oral health care for Medicaid-eligible children through four components: improved Medicaid claims processing, increased reimbursement for providers, outreach and educational activities to support providers, and parent and patient education about children's oral health. In the first 3 program years,…
78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...
Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.
ERIC Educational Resources Information Center
Deloria, Dennis; And Others
This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…
State-Wide Evaluation of the New Hampshire ESEA Title II, Part D Grant Program. Interim Report
ERIC Educational Resources Information Center
Knestis, Kirk; Smoke-Zur, Naomi; Higgins, Cathy
2010-01-01
The Title II-D grant program, "Enhancing Education Through Technology," (EETT) provides financial assistance to higher poverty school districts that have the greatest need for technology support or have been identified as being in need of improvement. In 2009, the American Reinvestment and Recovery Act (ARRA) provided an additional $650…
Extended-Day Kindergarten versus Half-Day Kindergarten: What One School District Decided.
ERIC Educational Resources Information Center
Firlik, Russell
The New Canaan Public Schools reduced its extended-day (21 hours per week) kindergarten program to half-day sessions (15 hours per week) in an interim program during a 2-year school construction-expansion phase. During a 9-month planning process, an ad hoc committee representing equal membership of teachers and parents from three elementary…
Government-Industry Data Exchange Program (GIDEP) and NASA Advisories
NASA Technical Reports Server (NTRS)
Sampson, Michael J.
2010-01-01
This viewgraph presentation reviews the Government-Industry Data Exchange Program (GIDEP) and NASA Advisories policy to practice. The contents include: 1) Purpose of the Government-Industry Data Exchange Program (GIDEP); 2) NASA and GSFC Documentation; 3) NASA Advisories, differences from GIDEP; 4) GIDEP Distribution by Originator; 5) New Interim GIDEP Policy for Suspect Counterfeits; 6) NASA and Suspect Counterfeits; 7) Threats to GIDEP; and 8) Conclusions and Contact Information.
Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules
2015-06-01
additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of
Map and data for Quaternary faults and folds in New Mexico
Machette, M.N.; Personius, S.F.; Kelson, K.I.; Haller, K.M.; Dart, R.L.
1998-01-01
The "World Map of Major Active Faults" Task Group is compiling a series of digital maps for the United States and other countries in the Western Hemisphere that show the locations, ages, and activity rates of major earthquake-related features such as faults and fault-related folds; the companion database includes published information on these seismogenic features. The Western Hemisphere effort is sponsored by International Lithosphere Program (ILP) Task Group H-2, whereas the effort to compile a new map and database for the United States is funded by the Earthquake Reduction Program (ERP) through the U.S. Geological Survey. The maps and accompanying databases represent a key contribution to the new Global Seismic Hazards Assessment Program (ILP Task Group II-O) for the International Decade for Natural Disaster Reduction. This compilation, which describes evidence for surface faulting and folding in New Mexico, is the third of many similar State and regional compilations that are planned for the U.S. The compilation for West Texas is available as U.S. Geological Survey Open-File Report 96-002 (Collins and others, 1996 #993) and the compilation for Montana will be released as a Montana Bureau of Mines product (Haller and others, in press #1750).
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Electronics America, Inc. From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test... Electronics America, Inc. (Samsung) from energy efficiency test procedure requirements that are applicable to...
Polymer concrete overlay test program : interim report.
DOT National Transportation Integrated Search
1974-11-01
This report describes work done on various combinations of monomers and polymer concrete mixes and identifies the mixes showing the greatest potential for use in bridge deck overlays . Presented are test results showing physical properties of various...
NAVSTAR GPS Simulation and Analysis Program (Interim Report)
DOT National Transportation Integrated Search
1983-10-01
This study assesses the capability of the planned NAVSTAR Global Positioning System (GPS) to meet civil navigation requirements. When it becomes operational in about 1983, NAVSTAR GPS will provide accurate two-dimensional and three-dimensional servic...
Experimental use of geogrids as an alternative to gravel placement : interim report - first year.
DOT National Transportation Integrated Search
2001-02-01
With the ongoing demand for improved infrastructure, the Maine Department of : Transportation (MDOT) continues to identify and evaluate new and innovative : construction methods and materials. The Departments Capital Highway Improvement : Program ...
Human factors experiments for data link : interim report 1
DOT National Transportation Integrated Search
1972-11-01
This report discusses three experiments aimed at providing information pertinent to the Data Link Operational Experiments Program. Section 1. describes the evaluation of the WIDCOM, a visual display, and a voice synthesizer for providing ATC informat...
NASA Technical Reports Server (NTRS)
2002-01-01
The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.
The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voegele, Michael D.; Vieth, Donald
2013-07-01
The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less
Technical know-how relevant to planning of borehole investigation for fault characterization
NASA Astrophysics Data System (ADS)
Mizuno, T.; Takeuchi, R.; Tsuruta, T.; Matsuoka, T.; Kunimaru, T.; Saegusa, H.
2011-12-01
As part of the national R&D program for geological disposal of high-level radioactive waste (HLW), the broad scientific study of the deep geological environment, JAEA has established the Mizunami Underground Research Laboratory (MIU) in Central Japan as a generic underground research laboratory (URL) facility. The MIU Project focuses on the crystalline rocks. In the case of fractured rock, a fault is one of the major discontinuity structures which control the groundwater flow conditions. It is important to estimate geological, hydrogeological, hydrochemical and rock mechanical characteristics of faults, and then to evaluate its role in the engineering design of repository and the assessment of long-term safety of HLW disposal. Therefore, investigations for fault characterization have been performed to estimate its characteristics and to evaluate existing conceptual and/or numerical models of the geological environment in the MIU project. Investigations related to faults have been conducted based on the conventional concept that a fault consists of a "fault core (FC)" characterized by distribution of the faulted rocks and a "fractured zone (FZ)" along FC. With the progress of investigations, furthermore, it is clear that there is also a case in which an "altered zone (AZ)" characterized by alteration of host rocks to clay minerals can be developed around the FC. Intensity of alteration in AZ generally decreases with distance from the FC, and AZ transits to FZ. Therefore, the investigation program focusing on properties of AZ is required for revising the existing conceptual and/or numerical models of geological environment. In this study, procedures for planning of fault characterizations have been summarized based on the technical know-how learnt through the MIU Project for the development of Knowledge Management System performed by JAEA under a contract with the Ministry of Economy, Trade and Industry as part of its R&D supporting program for developing geological disposal technology in 2010. Taking into account the experience from the fault characterization in the MIU Project, an optimization procedure for investigation program is summarized as follows; 1) Definition of investigation aim, 2) Confirmation of current understanding of the geological environment, 3) Specification and prioritization of the data to be obtained 4) Selection of the methodology for obtaining the data, 5) Specification of sequence of the investigations, and 6) Establishment of drilling and casing program including optional cases and taking into account potential problems. Several geological conceptual models with uncertainty of geological structures were illustrated to define the investigation aim and to confirm the current uncertainties. These models were also available to establish optional cases by predicting the type and location of potential problems. The procedures and case study related to establishment of the investigation program are summarized in this study and can be available for site characterization works conducted by the implementing body (NUMO) in future candidate areas.
NASA Technical Reports Server (NTRS)
Pride, R. A.
1978-01-01
Interim results from a number of ongoing, long-term environmental effects programs for composite materials are reported. The flight service experience is evaluated for 142 composite aircraft components after more than five years and one million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at five sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation has been observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.
Havens: Explicit Reliable Memory Regions for HPC Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hukerikar, Saurabh; Engelmann, Christian
2016-01-01
Supporting error resilience in future exascale-class supercomputing systems is a critical challenge. Due to transistor scaling trends and increasing memory density, scientific simulations are expected to experience more interruptions caused by transient errors in the system memory. Existing hardware-based detection and recovery techniques will be inadequate to manage the presence of high memory fault rates. In this paper we propose a partial memory protection scheme based on region-based memory management. We define the concept of regions called havens that provide fault protection for program objects. We provide reliability for the regions through a software-based parity protection mechanism. Our approach enablesmore » critical program objects to be placed in these havens. The fault coverage provided by our approach is application agnostic, unlike algorithm-based fault tolerance techniques.« less
Advanced information processing system: Fault injection study and results
NASA Technical Reports Server (NTRS)
Burkhardt, Laura F.; Masotto, Thomas K.; Lala, Jaynarayan H.
1992-01-01
The objective of the AIPS program is to achieve a validated fault tolerant distributed computer system. The goals of the AIPS fault injection study were: (1) to present the fault injection study components addressing the AIPS validation objective; (2) to obtain feedback for fault removal from the design implementation; (3) to obtain statistical data regarding fault detection, isolation, and reconfiguration responses; and (4) to obtain data regarding the effects of faults on system performance. The parameters are described that must be varied to create a comprehensive set of fault injection tests, the subset of test cases selected, the test case measurements, and the test case execution. Both pin level hardware faults using a hardware fault injector and software injected memory mutations were used to test the system. An overview is provided of the hardware fault injector and the associated software used to carry out the experiments. Detailed specifications are given of fault and test results for the I/O Network and the AIPS Fault Tolerant Processor, respectively. The results are summarized and conclusions are given.
New Madrid Seismotectonic Study: activities during fiscal year 1983
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buschbach, T.C.
1985-04-01
The New Madrid Seismotectonic Study is a coordinated program of geological, geophysical, and seismological investigations of the area within a 200-mile radius of New Madrid, Missouri. The study is designed to define the structural setting and tectonic history of the area in order to realistically evaluate earthquake risks in the siting of nuclear facilities. Our studies concentrated on defining boundaries of a proposed rift complex in the area, as well as establishing the relationships of the east-west trending fault systems with the northwest-trending faults of the Wabash Valley and New Madrid areas. There were 204 earthquakes located in 1983. Inmore » addition, the earthquake swarm in north-central Arkansas continued throughout the year, and 45,000 earthquakes have been recorded there since January, 1982. Current seismic activity in the Anna, Ohio, area appears to be related to the northwest-trending Fort Wayne rift and possibly with the rift's contact with a low-density pluton. Fault studies of the Rough Creek-Shawneetown Fault System showed mostly high-angle normal faults with a master fault that is a high-angle south-dipping reverse fault. Trenching of terrace deposits along the Kentucky River Fault System confirmed some anomalous conditions in terrace deposits previously indicated by electrical resistivity and augering programs. Thermal and chemical data from groundwater in the Mississippi Embayment appear to be useful in localizing deep faults that cut through the aquifers. Early indications from studies of jointing in Indiana are that the direction of major joint sets will be useful in determining regional stress directions. No Quaternary faulting was found in the Indiana or Illinois fault studies.« less
A pavement management research program for Oregon highways : interim report.
DOT National Transportation Integrated Search
1985-03-01
This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...
Evaluation of arterial service patrol programs.
DOT National Transportation Integrated Search
2009-12-01
This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?
Code of Federal Regulations, 2010 CFR
2010-07-01
... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...
ERIC Educational Resources Information Center
Oregon State Univ., Corvallis.
The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…
A Cooperative Program Between a City School District and a Suburban School District. Interim Report.
ERIC Educational Resources Information Center
Rochester City School District, NY.
An urban-suburban interdistrict program is described in which efforts were made to correct racial imbalance in both districts. In 1965 free transportation was provided for 25 first grade children who were sent voluntarily from a Rochester, N.Y. public school to six schools in the West Irondequoit district. This longitudinal metropolitan approach…
ERIC Educational Resources Information Center
McIntosh, William A.
This guide lists a series of pivotal questions about the educational program to be offered, and the answers to these questions bear directly on the numbers and kinds of instructional areas needed in the contemplated facilities. Much of the material is presented in a checklist format which allows for consideration of alternatives in facility…
National Home Start Evaluation Interim Report VI. Twelve-Month Program Issues, Outcomes and Costs.
ERIC Educational Resources Information Center
Goodrich, Nancy; And Others
This report assesses the progress of the six summative Home Start projects as evaluation families completed their first twelve months of enrollment. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her…
ERIC Educational Resources Information Center
Calhoun, Dave
Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…
Summary report, Flexible VSR`s and VSR channel sleeve development programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kempf, F.J.
1963-11-15
(VSR = vertical safety rod.) This report summarizes results of development programs which have evaluated vertical rod channel sleeving materials and provided flexible vertical rods, acceptable for both interim use before rod channel sleeving, and for subsequent use in sleeved channels. B{sub 4}C is the rod material; graphite and Al oxide are among the sleeve materials.
ERIC Educational Resources Information Center
Richburg-Hayes, Lashawn; Patel, Reshma; Brock, Thomas; de la Campa, Elijah; Rubb, Timothy; Valenzuela, Ireri
2015-01-01
One of the original purposes of student financial aid was to ensure fairer access to post-secondary education to those least able to afford it and to those traditionally underrepresented. Various federal and state programs were put in place to achieve this goal, including the federal Pell Grant and state aid programs. Yet policymakers and…
ERIC Educational Resources Information Center
Symons, Sarah L.; Colgoni, Andrew; Harvey, Chad T.
2017-01-01
We describe interim results of an ongoing longitudinal pedagogical study investigating the efficacy of the Honours Integrated Science Program (iSci). We describe the pedagogical methods we use to prompt research skill development in a model from instructor-dependence to independent original research. We also describe a tool we use to help students…
2017-05-19
The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.
Fault detection and accommodation testing on an F100 engine in an F-15 airplane
NASA Technical Reports Server (NTRS)
Myers, L. P.; Baer-Riedhart, J. L.; Maxwell, M. D.
1985-01-01
The fault detection and accommodation (FDA) methodology for digital engine-control systems may range from simple comparisons of redundant parameters to the more complex and sophisticated observer models of the entire engine system. Evaluations of the various FDA schemes are done using analytical methods, simulation, and limited-altitude-facility testing. Flight testing of the FDA logic has been minimal because of the difficulty of inducing realistic faults in flight. A flight program was conducted to evaluate the fault detection and accommodation capability of a digital electronic engine control in an F-15 aircraft. The objective of the flight program was to induce selected faults and evaluate the resulting actions of the digital engine controller. Comparisons were made between the flight results and predictions. Several anomalies were found in flight and during the ground test. Simulation results showed that the inducement of dual pressure failures was not feasible since the FDA logic was not designed to accommodate these types of failures.
Fault tolerant architectures for integrated aircraft electronics systems, task 2
NASA Technical Reports Server (NTRS)
Levitt, K. N.; Melliar-Smith, P. M.; Schwartz, R. L.
1984-01-01
The architectural basis for an advanced fault tolerant on-board computer to succeed the current generation of fault tolerant computers is examined. The network error tolerant system architecture is studied with particular attention to intercluster configurations and communication protocols, and to refined reliability estimates. The diagnosis of faults, so that appropriate choices for reconfiguration can be made is discussed. The analysis relates particularly to the recognition of transient faults in a system with tasks at many levels of priority. The demand driven data-flow architecture, which appears to have possible application in fault tolerant systems is described and work investigating the feasibility of automatic generation of aircraft flight control programs from abstract specifications is reported.
Detailed Geophysical Fault Characterization in Yucca Flat, Nevada Test Site, Nevada
Asch, Theodore H.; Sweetkind, Donald S.; Burton, Bethany L.; Wallin, Erin L.
2009-01-01
Yucca Flat is a topographic and structural basin in the northeastern part of the Nevada Test Site (NTS) in Nye County, Nevada. Between the years 1951 and 1992, 659 underground nuclear tests took place in Yucca Flat; most were conducted in large, vertical excavations that penetrated alluvium and the underlying Cenozoic volcanic rocks. Radioactive and other potential chemical contaminants at the NTS are the subject of a long-term program of investigation and remediation by the U.S. Department of Energy (DOE), National Nuclear Security Administration, Nevada Site Office, under its Environmental Restoration Program. As part of the program, the DOE seeks to assess the extent of contamination and to evaluate the potential risks to humans and the environment from byproducts of weapons testing. To accomplish this objective, the DOE Environmental Restoration Program is constructing and calibrating a ground-water flow model to predict hydrologic flow in Yucca Flat as part of an effort to quantify the subsurface hydrology of the Nevada Test Site. A necessary part of calibrating and evaluating a model of the flow system is an understanding of the location and characteristics of faults that may influence ground-water flow. In addition, knowledge of fault-zone architecture and physical properties is a fundamental component of the containment of the contamination from underground nuclear tests, should such testing ever resume at the Nevada Test Site. The goal of the present investigation is to develop a detailed understanding of the geometry and physical properties of fault zones in Yucca Flat. This study was designed to investigate faults in greater detail and to characterize fault geometry, the presence of fault splays, and the fault-zone width. Integrated geological and geophysical studies have been designed and implemented to work toward this goal. This report describes the geophysical surveys conducted near two drill holes in Yucca Flat, the data analyses performed, and the integrated interpretations developed from the suite of geophysical methodologies utilized in this investigation. Data collection for this activity started in the spring of 2005 and continued into 2006. A suite of electrical geophysical surveys were run in combination with ground magnetic surveys; these surveys resulted in high-resolution subsurface data that portray subsurface fault geometry at the two sites and have identified structures not readily apparent from surface geologic mapping, potential field geophysical data, or surface effects fracture maps.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.
75 FR 10645 - Low Pathogenic Avian Influenza; Voluntary Control Program and Payment of Indemnity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
...We are adopting as a final rule, with changes, an interim rule that amended the regulations by establishing, under the auspices of the National Poultry Improvement Plan, a voluntary program for the control of the H5/H7 subtypes of low pathogenic avian influenza in commercial poultry. As amended by this document, the rule provides that the amount of indemnity for which contract growers are eligible will be reduced by any payment they have already received on their contracts when poultry in their care are destroyed, clarifies the roles of cooperating State agencies with respect to H5/H7 low pathogenic avian influenza outbreaks, provides that consistency with humane euthanasia guidelines will be considered when selecting a method for the destruction of poultry, and provides additional guidance for cleaning and disinfecting an affected premises. The control program and indemnity provisions established by the interim rule are necessary to help ensure that the H5/H7 subtypes of low pathogenic avian influenza are detected and eradicated when they occur within the United States.
Conley, Kathleen M; Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2009-01-01
The KIDS (Kids Identifying and Defeating Stroke) Program is a three-year prospective, randomized, controlled, multiethnic school-based intervention study. Program goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic white (NHW) middle school students and their parents. This article describes the design, implementation and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the 6th, 7th, and 8th grades. Each class session also included a homework assignment that involved the students’ parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students’ stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls (p<0.001). We conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise. PMID:18332150
NASA Technical Reports Server (NTRS)
Wood, M. E.
1980-01-01
Four wire Wye connected ac power systems exhibit peculiar steady state fault characteristics when the fourth wire of three phase induction motors is connected. The loss of one phase of power source due to a series or shunt fault results in currents higher than anticipated on the remaining two phases. A theoretical approach to compute the fault currents and voltages is developed. A FORTRAN program is included in the appendix.
Care 3 phase 2 report, maintenance manual
NASA Technical Reports Server (NTRS)
Bryant, L. A.; Stiffler, J. J.
1982-01-01
CARE 3 (Computer-Aided Reliability Estimation, version three) is a computer program designed to help estimate the reliability of complex, redundant systems. Although the program can model a wide variety of redundant structures, it was developed specifically for fault-tolerant avionics systems--systems distinguished by the need for extremely reliable performance since a system failure could well result in the loss of human life. It substantially generalizes the class of redundant configurations that could be accommodated, and includes a coverage model to determine the various coverage probabilities as a function of the applicable fault recovery mechanisms (detection delay, diagnostic scheduling interval, isolation and recovery delay, etc.). CARE 3 further generalizes the class of system structures that can be modeled and greatly expands the coverage model to take into account such effects as intermittent and transient faults, latent faults, error propagation, etc.
DOT National Transportation Integrated Search
2002-08-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
Mobile satellite service for Canada
NASA Technical Reports Server (NTRS)
Sward, David
1988-01-01
The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.
Vibratory roller evaluation study : interim report No. 1.
DOT National Transportation Integrated Search
1974-08-01
The Louisiana Department of Highways has in progress a two phase program to evaluate the use of vibratory rollers in the compaction of asphaltic concrete pavements. Phase one on the first construction project is now complete with eight different vibr...
DOT National Transportation Integrated Search
2004-07-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Hearing. 57.807 Section 57.807 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...
This report report details the issues involved in implementing the Clean Air Act's Prevention of Significant Deterioration (PSD) program permittingrequirements for new and modified sources of greenhouse gases (GHGs).
Implementation of high performance concrete in Louisiana bridges : interim report.
DOT National Transportation Integrated Search
1998-02-01
The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...
Fault diagnostic instrumentation design for environmental control and life support systems
NASA Technical Reports Server (NTRS)
Yang, P. Y.; You, K. C.; Wynveen, R. A.; Powell, J. D., Jr.
1979-01-01
As a development phase moves toward flight hardware, the system availability becomes an important design aspect which requires high reliability and maintainability. As part of continous development efforts, a program to evaluate, design, and demonstrate advanced instrumentation fault diagnostics was successfully completed. Fault tolerance designs for reliability and other instrumenation capabilities to increase maintainability were evaluated and studied.
NASA Technical Reports Server (NTRS)
Landano, M. R.; Easter, R. W.
1984-01-01
Aspects of Space Station automated systems testing and verification are discussed, taking into account several program requirements. It is found that these requirements lead to a number of issues of uncertainties which require study and resolution during the Space Station definition phase. Most, if not all, of the considered uncertainties have implications for the overall testing and verification strategy adopted by the Space Station Program. A description is given of the Galileo Orbiter fault protection design/verification approach. Attention is given to a mission description, an Orbiter description, the design approach and process, the fault protection design verification approach/process, and problems of 'stress' testing.
The Realization of Drilling Fault Diagnosis Based on Hybrid Programming with Matlab and VB
NASA Astrophysics Data System (ADS)
Wang, Jiangping; Hu, Yingcai
This paper presents a method using hybrid programming with Matlab and VB based on ActiveX to design the system of drilling accident prediction and diagnosis. So that the powerful calculating function and graphical display function of Matlab and visual development interface of VB are combined fully. The main interface of the diagnosis system is compiled in VB,and the analysis and fault diagnosis are implemented by neural network tool boxes in Matlab.The system has favorable interactive interface,and the fault example validation shows that the diagnosis result is feasible and can meet the demands of drilling accident prediction and diagnosis.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
...Title I of the James Zadroga Health and Compensation Act of 2010 amended the Public Health Service Act (PHS Act) by adding Title XXXIII, which establishes the World Trade Center (WTC) Health Program. Sections 3311, 3312, and 3321 of Title XXXIII of the PHS Act require that the WTC Program Administrator develop regulations to implement portions of the WTC Health Program established within the Department of Health and Human Services (HHS). The WTC Health Program, which will be administered in part by the Director of the National Institute for Occupational Safety and Health (NIOSH), within the Centers for Disease Control and Prevention (CDC), will provide medical monitoring and treatment to eligible firefighters and related personnel, law enforcement officers, and rescue, recovery and cleanup workers who responded to the September 11, 2001, terrorist attacks in New York City, Shanksville, PA, and at the Pentagon, and to eligible survivors of the New York City attacks. This interim final rule establishes the processes by which eligible responders and survivors may apply for enrollment in the WTC Health Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions. This interim final rule also establishes a process for the certification of health conditions, and reimbursement rates for providers who provide initial health evaluations, treatment, and health monitoring.
Long-Term Pavement Performance Automated Faulting Measurement
DOT National Transportation Integrated Search
2015-02-01
This study focused on identifying transverse joint locations on jointed plain concrete pavements using an automated joint detection algorithm and computing faulting at these locations using Long-Term Pavement Performance (LTPP) Program profile data c...
ERIC Educational Resources Information Center
Morris, Mary; And Others
Third in a series of six, this volume reports findings concerning the impact of Project Developmental Continuity (PDC) on the parents of the evaluation study's cohort of children as well as preliminary findings on the relationship between family characteristics and program outcome variables up to the time the children had completed grade 1. Begun…
ERIC Educational Resources Information Center
Rosario, Jose; And Others
As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…
ERIC Educational Resources Information Center
Tracor, Inc., Austin, TX.
Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…
ERIC Educational Resources Information Center
ERICKSEN, GERALD L.; RYAN, JAMES J.
A REPORT IS GIVEN OF THE FIRST 3 YEARS OF A FIELD STUDY CONDUCTED TO DETERMINE THE EFFECTIVENESS OF SEVERAL PROTOTYPE, SECONDARY MATHEMATICS PROGRAMS THAT WERE PRODUCED BY DIFFERENT CURRICULUM DEVELOPMENT GROUPS. MATHEMATICS TEACHERS WHO HAD NO PREVIOUS EXPERIENCE WITH "MODERN" OR EXPERIMENTAL APPROACHES TO MATHEMATICS TAUGHT A SELECTED…
ERIC Educational Resources Information Center
National Academy of Sciences - National Research Council, Washington, DC. Office of International Affairs.
This study was conducted to provide the U.S. Department of State with an assessment of the potential impacts on science of a United States withdrawal from UNESCO and to suggest possible alternative arrangements to maintain essential U.S. scientific contacts with UNESCO-sponsored programs in case the United States were no longer a member of UNESCO…
ERIC Educational Resources Information Center
Ellis, James D.; Maxwell, Donald E.
The purposes of the Colorado Science Teaching Enhancement Program (CO-STEP) are to improve the background in science content and the instructional skills of teachers in grades four through six throughout Colorado and to support the implementation of effective instruction. A network of six Teacher Development Centers in Colorado coordinate teacher…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 2 NOX averaging, banking and trading programs work? 86.1861-04 Section 86.1861-04 Protection of... work? (a) General provisions for Tier 2 credits and debits. (1) A manufacturer whose Tier 2 fleet... to a full useful life of 100,000 miles, provided that the credits are prorated by a multiplicative...
NASA Technical Reports Server (NTRS)
Rogers, William H.
1993-01-01
In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.
NASA Technical Reports Server (NTRS)
Martinovic, Zoran N.; Cerro, Jeffrey A.
2002-01-01
This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
NASA Technical Reports Server (NTRS)
Lee, Charles; Alena, Richard L.; Robinson, Peter
2004-01-01
We started from ISS fault trees example to migrate to decision trees, presented a method to convert fault trees to decision trees. The method shows that the visualizations of root cause of fault are easier and the tree manipulating becomes more programmatic via available decision tree programs. The visualization of decision trees for the diagnostic shows a format of straight forward and easy understands. For ISS real time fault diagnostic, the status of the systems could be shown by mining the signals through the trees and see where it stops at. The other advantage to use decision trees is that the trees can learn the fault patterns and predict the future fault from the historic data. The learning is not only on the static data sets but also can be online, through accumulating the real time data sets, the decision trees can gain and store faults patterns in the trees and recognize them when they come.
INTERIM METHOD FOR THE DETERMINATION OF ASBESTOS IN BULK INSULATION SAMPLES
The U.S. Environmental Protection Agency Asbestos-in-Schools Program was established in March, 1979 to provide information and technical assistance to the public for addressing problems presented by asbestos-containing insulation materials in school buildings. Because there were ...
40 CFR 265.113 - Closure; time allowed for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) “Carburetor Cleanliness Test Procedure, State-of-the-Art Summary, Report: 1973-1981”, Coordinating Research... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold... who manufacture, supply, or transfer detergent additives or detergent-additized post-refinery...
40 CFR 57.813 - Final decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Final decision. 57.813 Section 57.813 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...
Land Use Management for Solid Waste Programs
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1974-01-01
The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)
NASA Technical Reports Server (NTRS)
Shaver, Charles; Williamson, Michael
1986-01-01
The NASA Ames Research Center sponsors a research program for the investigation of Intelligent Flight Control Actuation systems. The use of artificial intelligence techniques in conjunction with algorithmic techniques for autonomous, decentralized fault management of flight-control actuation systems is explored under this program. The design, development, and operation of the interface for laboratory investigation of this program is documented. The interface, architecturally based on the Intel 8751 microcontroller, is an interrupt-driven system designed to receive a digital message from an ultrareliable fault-tolerant control system (UFTCS). The interface links the UFTCS to an electronic servo-control unit, which controls a set of hydraulic actuators. It was necessary to build a UFTCS emulator (also based on the Intel 8751) to provide signal sources for testing the equipment.
NASA Technical Reports Server (NTRS)
Gross, Anthony R.; Gerald-Yamasaki, Michael; Trent, Robert P.
2009-01-01
As part of the FDIR (Fault Detection, Isolation, and Recovery) Project for the Constellation Program, a task was designed within the context of the Constellation Program FDIR project called the Legacy Benchmarking Task to document as accurately as possible the FDIR processes and resources that were used by the Space Shuttle ground support equipment (GSE) during the Shuttle flight program. These results served as a comparison with results obtained from the new FDIR capability. The task team assessed Shuttle and EELV (Evolved Expendable Launch Vehicle) historical data for GSE-related launch delays to identify expected benefits and impact. This analysis included a study of complex fault isolation situations that required a lengthy troubleshooting process. Specifically, four elements of that system were considered: LH2 (liquid hydrogen), LO2 (liquid oxygen), hydraulic test, and ground special power.
NASA Astrophysics Data System (ADS)
Sahin, Sefa; Yildirim, Cengiz; Akif Sarikaya, Mehmet; Tuysuz, Okan; Genc, S. Can; Ersen Aksoy, Murat; Ertekin Doksanalti, Mustafa
2016-04-01
Cosmogenic surface exposure dating is based on the production of rare nuclides in exposed rocks, which interact with cosmic rays. Through modelling of measured 36Cl concentrations, we might obtain information of the history of the earthquake activity. Yet, there are several factors which may impact production of rare nuclides such as geometry of the fault, topography, geographic location of the study area, temporal variations of the Earth's magnetic field, self-cover and denudation rate on the scarp. Recently developed models provides a method to infer timing of earthquakes and slip rates on limited scales by taking into account these parameters. Our study area, the Knidos Fault Zone, is located on the Datça Peninsula in Southwestern Anatolia and contains several normal fault scarps formed within the limestone, which are appropriate to generate cosmogenic chlorine-36 (36Cl) dating models. Since it has a well-preserved scarp, we have focused on the Mezarlık Segment of the fault zone, which has an average length of 300 m and height 12-15 m. 128 continuous samples from top to bottom of the fault scarp were collected to carry out analysis of cosmic 36Cl isotopes concentrations. The main purpose of this study is to analyze factors affecting the production rates and amount of cosmogenic 36Cl nuclides concentration. Concentration of Cl36 isotopes are measured by AMS laboratories. Through the local production rates and concentration of the cosmic isotopes, we can calculate exposure ages of the samples. Recent research elucidated each step of the application of this method by the Matlab programming language (e.g. Schlagenhauf et al., 2010). It is vitally helpful to generate models of Quaternary activity of the normal faults. We, however, wanted to build a user-friendly program through an open source programing language "R" (GNU Project) that might be able to help those without knowledge of complex math programming, making calculations as easy and understandable as possible. Through our codes, physical parameters, statistical analysis and graphics production of the fault models can be generated for each platform. This project is supported by the Scientific and Technological Research Council of Turkey (TUBITAK, Grant number: 113Y436) This study was conducted with the Decision of the Council of Ministers with No. 2013/5387 on the date 30.09.2013 and was done with the permission of Knidos Presidency of excavation in accordance with the scope of Knidos Excavation and Research carried out on behalf of Selcuk University and Ministry of Culture and Tourism. Keywords: Knidos, geomorphology, modelling, cosmogenic surface exposure dating, chlorine36
Model-Based Fault Tolerant Control
NASA Technical Reports Server (NTRS)
Kumar, Aditya; Viassolo, Daniel
2008-01-01
The Model Based Fault Tolerant Control (MBFTC) task was conducted under the NASA Aviation Safety and Security Program. The goal of MBFTC is to develop and demonstrate real-time strategies to diagnose and accommodate anomalous aircraft engine events such as sensor faults, actuator faults, or turbine gas-path component damage that can lead to in-flight shutdowns, aborted take offs, asymmetric thrust/loss of thrust control, or engine surge/stall events. A suite of model-based fault detection algorithms were developed and evaluated. Based on the performance and maturity of the developed algorithms two approaches were selected for further analysis: (i) multiple-hypothesis testing, and (ii) neural networks; both used residuals from an Extended Kalman Filter to detect the occurrence of the selected faults. A simple fusion algorithm was implemented to combine the results from each algorithm to obtain an overall estimate of the identified fault type and magnitude. The identification of the fault type and magnitude enabled the use of an online fault accommodation strategy to correct for the adverse impact of these faults on engine operability thereby enabling continued engine operation in the presence of these faults. The performance of the fault detection and accommodation algorithm was extensively tested in a simulation environment.
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous Vehicles
2007-11-01
Tolerant Overactuated Autonomous Vehicles Casavola, A.; Garone, E. (2007) Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous ...Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous Vehicles 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...Tolerant Overactuated Autonomous Vehicles 3.2 - 2 RTO-MP-AVT-145 UNCLASSIFIED/UNLIMITED Control allocation problem (CAP) - Given a virtual input v(t
Reliability model derivation of a fault-tolerant, dual, spare-switching, digital computer system
NASA Technical Reports Server (NTRS)
1974-01-01
A computer based reliability projection aid, tailored specifically for application in the design of fault-tolerant computer systems, is described. Its more pronounced characteristics include the facility for modeling systems with two distinct operational modes, measuring the effect of both permanent and transient faults, and calculating conditional system coverage factors. The underlying conceptual principles, mathematical models, and computer program implementation are presented.
Computer-Aided Reliability Estimation
NASA Technical Reports Server (NTRS)
Bavuso, S. J.; Stiffler, J. J.; Bryant, L. A.; Petersen, P. L.
1986-01-01
CARE III (Computer-Aided Reliability Estimation, Third Generation) helps estimate reliability of complex, redundant, fault-tolerant systems. Program specifically designed for evaluation of fault-tolerant avionics systems. However, CARE III general enough for use in evaluation of other systems as well.
An experiment in software reliability
NASA Technical Reports Server (NTRS)
Dunham, J. R.; Pierce, J. L.
1986-01-01
The results of a software reliability experiment conducted in a controlled laboratory setting are reported. The experiment was undertaken to gather data on software failures and is one in a series of experiments being pursued by the Fault Tolerant Systems Branch of NASA Langley Research Center to find a means of credibly performing reliability evaluations of flight control software. The experiment tests a small sample of implementations of radar tracking software having ultra-reliability requirements and uses n-version programming for error detection, and repetitive run modeling for failure and fault rate estimation. The experiment results agree with those of Nagel and Skrivan in that the program error rates suggest an approximate log-linear pattern and the individual faults occurred with significantly different error rates. Additional analysis of the experimental data raises new questions concerning the phenomenon of interacting faults. This phenomenon may provide one explanation for software reliability decay.
PAWS/STEM - PADE APPROXIMATION WITH SCALING AND SCALED TAYLOR EXPONENTIAL MATRIX (VAX VMS VERSION)
NASA Technical Reports Server (NTRS)
Butler, R. W.
1994-01-01
Traditional fault-tree techniques for analyzing the reliability of large, complex systems fail to model the dynamic reconfiguration capabilities of modern computer systems. Markov models, on the other hand, can describe fault-recovery (via system reconfiguration) as well as fault-occurrence. The Pade Approximation with Scaling (PAWS) and Scaled Taylor Exponential Matrix (STEM) programs provide a flexible, user-friendly, language-based interface for the creation and evaluation of Markov models describing the behavior of fault-tolerant reconfigurable computer systems. PAWS and STEM produce exact solutions for the probability of system failure and provide a conservative estimate of the number of significant digits in the solution. The calculation of the probability of entering a death state of a Markov model (representing system failure) requires the solution of a set of coupled differential equations. Because of the large disparity between the rates of fault arrivals and system recoveries, Markov models of fault-tolerant architectures inevitably lead to numerically stiff differential equations. Both PAWS and STEM have the capability to solve numerically stiff models. These complementary programs use separate methods to determine the matrix exponential in the solution of the model's system of differential equations. In general, PAWS is better suited to evaluate small and dense models. STEM operates at lower precision, but works faster than PAWS for larger models. The mathematical approach chosen to solve a reliability problem may vary with the size and nature of the problem. Although different solution techniques are utilized on different programs, it is possible to have a common input language. The Systems Validation Methods group at NASA Langley Research Center has created a set of programs that form the basis for a reliability analysis workstation. The set of programs are: SURE reliability analysis program (COSMIC program LAR-13789, LAR-14921); the ASSIST specification interface program (LAR-14193, LAR-14923), PAWS/STEM reliability analysis programs (LAR-14165, LAR-14920); and the FTC fault tree tool (LAR-14586, LAR-14922). FTC is used to calculate the top-event probability for a fault tree. PAWS/STEM and SURE are programs which interpret the same SURE language, but utilize different solution methods. ASSIST is a preprocessor that generates SURE language from a more abstract definition. SURE, ASSIST, and PAWS/STEM are also offered as a bundle. Please see the abstract for COS-10039/COS-10041, SARA - SURE/ASSIST Reliability Analysis Workstation, for pricing details. PAWS/STEM was originally developed for DEC VAX series computers running VMS and was later ported for use on Sun computers running SunOS. The package is written in PASCAL, ANSI compliant C-language, and FORTRAN 77. The standard distribution medium for the VMS version of PAWS/STEM (LAR-14165) is a 9-track 1600 BPI magnetic tape in VMSINSTAL format. It is also available on a TK50 tape cartridge in VMSINSTAL format. Executables are included. The standard distribution medium for the Sun version of PAWS/STEM (LAR-14920) is a .25 inch streaming magnetic tape cartridge in UNIX tar format. Both Sun3 and Sun4 executables are included. PAWS/STEM was developed in 1989 and last updated in 1991. DEC, VAX, VMS, and TK50 are trademarks of Digital Equipment Corporation. SunOS, Sun3, and Sun4 are trademarks of Sun Microsystems, Inc. UNIX is a registered trademark of AT&T Bell Laboratories.
PAWS/STEM - PADE APPROXIMATION WITH SCALING AND SCALED TAYLOR EXPONENTIAL MATRIX (SUN VERSION)
NASA Technical Reports Server (NTRS)
Butler, R. W.
1994-01-01
Traditional fault-tree techniques for analyzing the reliability of large, complex systems fail to model the dynamic reconfiguration capabilities of modern computer systems. Markov models, on the other hand, can describe fault-recovery (via system reconfiguration) as well as fault-occurrence. The Pade Approximation with Scaling (PAWS) and Scaled Taylor Exponential Matrix (STEM) programs provide a flexible, user-friendly, language-based interface for the creation and evaluation of Markov models describing the behavior of fault-tolerant reconfigurable computer systems. PAWS and STEM produce exact solutions for the probability of system failure and provide a conservative estimate of the number of significant digits in the solution. The calculation of the probability of entering a death state of a Markov model (representing system failure) requires the solution of a set of coupled differential equations. Because of the large disparity between the rates of fault arrivals and system recoveries, Markov models of fault-tolerant architectures inevitably lead to numerically stiff differential equations. Both PAWS and STEM have the capability to solve numerically stiff models. These complementary programs use separate methods to determine the matrix exponential in the solution of the model's system of differential equations. In general, PAWS is better suited to evaluate small and dense models. STEM operates at lower precision, but works faster than PAWS for larger models. The mathematical approach chosen to solve a reliability problem may vary with the size and nature of the problem. Although different solution techniques are utilized on different programs, it is possible to have a common input language. The Systems Validation Methods group at NASA Langley Research Center has created a set of programs that form the basis for a reliability analysis workstation. The set of programs are: SURE reliability analysis program (COSMIC program LAR-13789, LAR-14921); the ASSIST specification interface program (LAR-14193, LAR-14923), PAWS/STEM reliability analysis programs (LAR-14165, LAR-14920); and the FTC fault tree tool (LAR-14586, LAR-14922). FTC is used to calculate the top-event probability for a fault tree. PAWS/STEM and SURE are programs which interpret the same SURE language, but utilize different solution methods. ASSIST is a preprocessor that generates SURE language from a more abstract definition. SURE, ASSIST, and PAWS/STEM are also offered as a bundle. Please see the abstract for COS-10039/COS-10041, SARA - SURE/ASSIST Reliability Analysis Workstation, for pricing details. PAWS/STEM was originally developed for DEC VAX series computers running VMS and was later ported for use on Sun computers running SunOS. The package is written in PASCAL, ANSI compliant C-language, and FORTRAN 77. The standard distribution medium for the VMS version of PAWS/STEM (LAR-14165) is a 9-track 1600 BPI magnetic tape in VMSINSTAL format. It is also available on a TK50 tape cartridge in VMSINSTAL format. Executables are included. The standard distribution medium for the Sun version of PAWS/STEM (LAR-14920) is a .25 inch streaming magnetic tape cartridge in UNIX tar format. Both Sun3 and Sun4 executables are included. PAWS/STEM was developed in 1989 and last updated in 1991. DEC, VAX, VMS, and TK50 are trademarks of Digital Equipment Corporation. SunOS, Sun3, and Sun4 are trademarks of Sun Microsystems, Inc. UNIX is a registered trademark of AT&T Bell Laboratories.
NASA Technical Reports Server (NTRS)
Harper, Richard E.; Babikyan, Carol A.; Butler, Bryan P.; Clasen, Robert J.; Harris, Chris H.; Lala, Jaynarayan H.; Masotto, Thomas K.; Nagle, Gail A.; Prizant, Mark J.; Treadwell, Steven
1994-01-01
The Army Avionics Research and Development Activity (AVRADA) is pursuing programs that would enable effective and efficient management of large amounts of situational data that occurs during tactical rotorcraft missions. The Computer Aided Low Altitude Night Helicopter Flight Program has identified automated Terrain Following/Terrain Avoidance, Nap of the Earth (TF/TA, NOE) operation as key enabling technology for advanced tactical rotorcraft to enhance mission survivability and mission effectiveness. The processing of critical information at low altitudes with short reaction times is life-critical and mission-critical necessitating an ultra-reliable/high throughput computing platform for dependable service for flight control, fusion of sensor data, route planning, near-field/far-field navigation, and obstacle avoidance operations. To address these needs the Army Fault Tolerant Architecture (AFTA) is being designed and developed. This computer system is based upon the Fault Tolerant Parallel Processor (FTPP) developed by Charles Stark Draper Labs (CSDL). AFTA is hard real-time, Byzantine, fault-tolerant parallel processor which is programmed in the ADA language. This document describes the results of the Detailed Design (Phase 2 and 3 of a 3-year project) of the AFTA development. This document contains detailed descriptions of the program objectives, the TF/TA NOE application requirements, architecture, hardware design, operating systems design, systems performance measurements and analytical models.
CUTSETS - MINIMAL CUT SET CALCULATION FOR DIGRAPH AND FAULT TREE RELIABILITY MODELS
NASA Technical Reports Server (NTRS)
Iverson, D. L.
1994-01-01
Fault tree and digraph models are frequently used for system failure analysis. Both type of models represent a failure space view of the system using AND and OR nodes in a directed graph structure. Fault trees must have a tree structure and do not allow cycles or loops in the graph. Digraphs allow any pattern of interconnection between loops in the graphs. A common operation performed on digraph and fault tree models is the calculation of minimal cut sets. A cut set is a set of basic failures that could cause a given target failure event to occur. A minimal cut set for a target event node in a fault tree or digraph is any cut set for the node with the property that if any one of the failures in the set is removed, the occurrence of the other failures in the set will not cause the target failure event. CUTSETS will identify all the minimal cut sets for a given node. The CUTSETS package contains programs that solve for minimal cut sets of fault trees and digraphs using object-oriented programming techniques. These cut set codes can be used to solve graph models for reliability analysis and identify potential single point failures in a modeled system. The fault tree minimal cut set code reads in a fault tree model input file with each node listed in a text format. In the input file the user specifies a top node of the fault tree and a maximum cut set size to be calculated. CUTSETS will find minimal sets of basic events which would cause the failure at the output of a given fault tree gate. The program can find all the minimal cut sets of a node, or minimal cut sets up to a specified size. The algorithm performs a recursive top down parse of the fault tree, starting at the specified top node, and combines the cut sets of each child node into sets of basic event failures that would cause the failure event at the output of that gate. Minimal cut set solutions can be found for all nodes in the fault tree or just for the top node. The digraph cut set code uses the same techniques as the fault tree cut set code, except it includes all upstream digraph nodes in the cut sets for a given node and checks for cycles in the digraph during the solution process. CUTSETS solves for specified nodes and will not automatically solve for all upstream digraph nodes. The cut sets will be output as a text file. CUTSETS includes a utility program that will convert the popular COD format digraph model description files into text input files suitable for use with the CUTSETS programs. FEAT (MSC-21873) and FIRM (MSC-21860) available from COSMIC are examples of programs that produce COD format digraph model description files that may be converted for use with the CUTSETS programs. CUTSETS is written in C-language to be machine independent. It has been successfully implemented on a Sun running SunOS, a DECstation running ULTRIX, a Macintosh running System 7, and a DEC VAX running VMS. The RAM requirement varies with the size of the models. CUTSETS is available in UNIX tar format on a .25 inch streaming magnetic tape cartridge (standard distribution) or on a 3.5 inch diskette. It is also available on a 3.5 inch Macintosh format diskette or on a 9-track 1600 BPI magnetic tape in DEC VAX FILES-11 format. Sample input and sample output are provided on the distribution medium. An electronic copy of the documentation in Macintosh Microsoft Word format is included on the distribution medium. Sun and SunOS are trademarks of Sun Microsystems, Inc. DEC, DeCstation, ULTRIX, VAX, and VMS are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories. Macintosh is a registered trademark of Apple Computer, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less
Software Implemented Fault-Tolerant (SIFT) user's guide
NASA Technical Reports Server (NTRS)
Green, D. F., Jr.; Palumbo, D. L.; Baltrus, D. W.
1984-01-01
Program development for a Software Implemented Fault Tolerant (SIFT) computer system is accomplished in the NASA LaRC AIRLAB facility using a DEC VAX-11 to interface with eight Bendix BDX 930 flight control processors. The interface software which provides this SIFT program development capability was developed by AIRLAB personnel. This technical memorandum describes the application and design of this software in detail, and is intended to assist both the user in performance of SIFT research and the systems programmer responsible for maintaining and/or upgrading the SIFT programming environment.
The use of automatic programming techniques for fault tolerant computing systems
NASA Technical Reports Server (NTRS)
Wild, C.
1985-01-01
It is conjectured that the production of software for ultra-reliable computing systems such as required by Space Station, aircraft, nuclear power plants and the like will require a high degree of automation as well as fault tolerance. In this paper, the relationship between automatic programming techniques and fault tolerant computing systems is explored. Initial efforts in the automatic synthesis of code from assertions to be used for error detection as well as the automatic generation of assertions and test cases from abstract data type specifications is outlined. Speculation on the ability to generate truly diverse designs capable of recovery from errors by exploring alternate paths in the program synthesis tree is discussed. Some initial thoughts on the use of knowledge based systems for the global detection of abnormal behavior using expectations and the goal-directed reconfiguration of resources to meet critical mission objectives are given. One of the sources of information for these systems would be the knowledge captured during the automatic programming process.
This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.
77 FR 4674 - State Fiscal Stabilization Fund Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T.
2016-02-23
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used atmore » the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less
The Homestake Interim Laboratory and Homestake DUSEL
NASA Astrophysics Data System (ADS)
Lesko, Kevin T.
2011-12-01
The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for developing the Homestake Interim Laboratory and evolving this facility into DUSEL are presented.
Cell boundary fault detection system
Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN
2011-04-19
An apparatus and program product determine a nodal fault along the boundary, or face, of a computing cell. Nodes on adjacent cell boundaries communicate with each other, and the communications are analyzed to determine if a node or connection is faulty.
Design and Implementation of a Distributed Version of the NASA Engine Performance Program
NASA Technical Reports Server (NTRS)
Cours, Jeffrey T.
1994-01-01
Distributed NEPP is a new version of the NASA Engine Performance Program that runs in parallel on a collection of Unix workstations connected through a network. The program is fault-tolerant, efficient, and shows significant speed-up in a multi-user, heterogeneous environment. This report describes the issues involved in designing distributed NEPP, the algorithms the program uses, and the performance distributed NEPP achieves. It develops an analytical model to predict and measure the performance of the simple distribution, multiple distribution, and fault-tolerant distribution algorithms that distributed NEPP incorporates. Finally, the appendices explain how to use distributed NEPP and document the organization of the program's source code.
ERIC Educational Resources Information Center
New York State Interdepartmental Fuel and Energy Committee, Albany.
After presenting the background of the availability of fuel for transportation and the increasing per capita energy consumption, the report examines the State's role in energy conservation. Five proposals are outlined: (1) a coordinated education program designed to increase public awareness of the current energy situation; (2) a pilot program of…
Study of fault-tolerant software technology
NASA Technical Reports Server (NTRS)
Slivinski, T.; Broglio, C.; Wild, C.; Goldberg, J.; Levitt, K.; Hitt, E.; Webb, J.
1984-01-01
Presented is an overview of the current state of the art of fault-tolerant software and an analysis of quantitative techniques and models developed to assess its impact. It examines research efforts as well as experience gained from commercial application of these techniques. The paper also addresses the computer architecture and design implications on hardware, operating systems and programming languages (including Ada) of using fault-tolerant software in real-time aerospace applications. It concludes that fault-tolerant software has progressed beyond the pure research state. The paper also finds that, although not perfectly matched, newer architectural and language capabilities provide many of the notations and functions needed to effectively and efficiently implement software fault-tolerance.
NASA Technical Reports Server (NTRS)
Smith, T. B., III; Lala, J. H.
1984-01-01
The FTMP architecture is a high reliability computer concept modeled after a homogeneous multiprocessor architecture. Elements of the FTMP are operated in tight synchronism with one another and hardware fault-detection and fault-masking is provided which is transparent to the software. Operating system design and user software design is thus greatly simplified. Performance of the FTMP is also comparable to that of a simplex equivalent due to the efficiency of fault handling hardware. The FTMP project constructed an engineering module of the FTMP, programmed the machine and extensively tested the architecture through fault injection and other stress testing. This testing confirmed the soundness of the FTMP concepts.
Simulation of an Air Cushion Vehicle
1977-03-01
Massachusetts 02139 ! DDC Niov 219T March 1977 Final Report for Period January 1975 - December 1976 DOD DISTRIBUTION STATEMENT Approved for public...or in ,art is permitted for any purpose of the United States Government. II II JI UNCLASSI FIED SECURITY CLASSIFICATiON OF TIlS PAGE flWhen Dato...overflow Floating point fault Decimal arithmetic fault Watch Dog timer runout 186 NAVTRAEQUIPCEN 75-C-0057- 1 PROGRAM ENi\\TRY Initial Program - LOAD Inhibit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure;more » radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.« less
NASA Astrophysics Data System (ADS)
Shao, Renping; Li, Jing; Hu, Wentao; Dong, Feifei
2013-02-01
Higher order cumulants (HOC) is a new kind of modern signal analysis of theory and technology. Spectrum entropy clustering (SEC) is a data mining method of statistics, extracting useful characteristics from a mass of nonlinear and non-stationary data. Following a discussion on the characteristics of HOC theory and SEC method in this paper, the study of signal processing techniques and the unique merits of nonlinear coupling characteristic analysis in processing random and non-stationary signals are introduced. Also, a new clustering analysis and diagnosis method is proposed for detecting multi-damage on gear by introducing the combination of HOC and SEC into the damage-detection and diagnosis of the gear system. The noise is restrained by HOC and by extracting coupling features and separating the characteristic signal at different speeds and frequency bands. Under such circumstances, the weak signal characteristics in the system are emphasized and the characteristic of multi-fault is extracted. Adopting a data-mining method of SEC conducts an analysis and diagnosis at various running states, such as the speed of 300 r/min, 900 r/min, 1200 r/min, and 1500 r/min of the following six signals: no-fault, short crack-fault in tooth root, long crack-fault in tooth root, short crack-fault in pitch circle, long crack-fault in pitch circle, and wear-fault on tooth. Research shows that this combined method of detection and diagnosis can also identify the degree of damage of some faults. On this basis, the virtual instrument of the gear system which detects damage and diagnoses faults is developed by combining with advantages of MATLAB and VC++, employing component object module technology, adopting mixed programming methods, and calling the program transformed from an *.m file under VC++. This software system possesses functions of collecting and introducing vibration signals of gear, analyzing and processing signals, extracting features, visualizing graphics, detecting and diagnosing faults, detecting and monitoring, etc. Finally, the results of testing and verifying show that the developed system can effectively be used to detect and diagnose faults in an actual operating gear transmission system.
Shao, Renping; Li, Jing; Hu, Wentao; Dong, Feifei
2013-02-01
Higher order cumulants (HOC) is a new kind of modern signal analysis of theory and technology. Spectrum entropy clustering (SEC) is a data mining method of statistics, extracting useful characteristics from a mass of nonlinear and non-stationary data. Following a discussion on the characteristics of HOC theory and SEC method in this paper, the study of signal processing techniques and the unique merits of nonlinear coupling characteristic analysis in processing random and non-stationary signals are introduced. Also, a new clustering analysis and diagnosis method is proposed for detecting multi-damage on gear by introducing the combination of HOC and SEC into the damage-detection and diagnosis of the gear system. The noise is restrained by HOC and by extracting coupling features and separating the characteristic signal at different speeds and frequency bands. Under such circumstances, the weak signal characteristics in the system are emphasized and the characteristic of multi-fault is extracted. Adopting a data-mining method of SEC conducts an analysis and diagnosis at various running states, such as the speed of 300 r/min, 900 r/min, 1200 r/min, and 1500 r/min of the following six signals: no-fault, short crack-fault in tooth root, long crack-fault in tooth root, short crack-fault in pitch circle, long crack-fault in pitch circle, and wear-fault on tooth. Research shows that this combined method of detection and diagnosis can also identify the degree of damage of some faults. On this basis, the virtual instrument of the gear system which detects damage and diagnoses faults is developed by combining with advantages of MATLAB and VC++, employing component object module technology, adopting mixed programming methods, and calling the program transformed from an *.m file under VC++. This software system possesses functions of collecting and introducing vibration signals of gear, analyzing and processing signals, extracting features, visualizing graphics, detecting and diagnosing faults, detecting and monitoring, etc. Finally, the results of testing and verifying show that the developed system can effectively be used to detect and diagnose faults in an actual operating gear transmission system.
IVHS Countermeasures for Rear-End Collisions, Task 1 Vol. III: 1991 NASS CDS Case Analysis
DOT National Transportation Integrated Search
1994-02-15
This report is from the NHTSA sponsored program, "IVHS Countermeasures for Rear-End Collisions". The Task 1 Interim Report consists of six volumes. This Volume, Volume III, 1991 NASS CDS Clinical Case Analysis presents the results of a clinical case ...
Study of Fuel Economy and Emission Reduction Methods for Marine and Locomotive Diesel Engines
DOT National Transportation Integrated Search
1975-09-01
This interim report presents the results of the first phase of a two-part program to investigate methods of improving fuel consumption and reducing exhaust emissions for in-service diesel engines used as prime movers in locomotives and several classe...
A Study of an Emerging Occupation: The Gastroenterology Assistant. Interim Report.
ERIC Educational Resources Information Center
Kuritsky, Joel; Goldsmith, Katherine L.
To determine the need, desirability, and training requirements for a gastroenterology assistant training program, interviews with gastroenterologists, a survey of 15 hospitals, and observations of gastroenterology laboratories were conducted. In addition, a questionnaire to ascertain which laboratory tests the assistant would perform was…
7 CFR 280.1 - Interim disaster procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...
7 CFR 280.1 - Interim disaster procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... scientific matters bearing on such variances and exemptions), and (2) advise of the opportunity to submit...
Health: Overview. Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
The Manitoba Health Education Curriculum focuses on promoting the development of positive lifestyle practices in students from kindergarten through grade nine. The core units of the program are: (1) social-emotional well-being; (2) physical well-being; (3) nutrition; (4) dental health; (5) safety; and (6) environmental health. This overview offers…
A risk assessment was conducted by the US Environmental Protection Agency (EPA) as part of the 2003 Interim Registration Eligibility Document (IRED) on atrazine. The assessment indicated potential community- and population-level risk to sensitive aquatic ecosystems at prolonged ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Evaluation. 30.30-9 Section 30.30-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for Evaluating Vessel Personnel Licensing and Certification Programs of Foreign Countries § 30.30-9 Evaluation. Materials...
40 CFR 57.816 - Effect of negative recommendation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Effect of negative recommendation. 57.816 Section 57.816 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Reduction Technology § 57.816 Effect of negative recommendation. No waiver of the interim requirement for...
75 FR 55634 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-13
...: 1505-0209. Type of Review: Revision of a currently approved collection. Title: Troubled Asset Relief Program--Conflicts of Interest. Abstract: The interim rule sets forth the process for reviewing and addressing actual or potential conflicts of interest among any individuals or entities seeking or having a...
Project International Emphasis Interim Report, July 1991.
ERIC Educational Resources Information Center
Blois, Beverly, Ed.; Williams, Barbara
Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
Recent developments - US spent fuel disposition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
One of a US utility's major risk factors in continuing to operate a nuclear plant is managing discharged spent fuel. The US Department of Energy (DOE) signed contracts with utilities guaranteeing government acceptance of spent fuel by 1988. However, on December 17, 1992, DOE Secretary Watkins wrote to Sen. J. Bennett Johnston (D-LA), Chairman of the Senate Energy Committee, indicating a reassessment of DOE's programs, the results of which will be presented to Congress in January 1993. He indicated the Department may not be able to meet the 1988 date, because of difficulty in finding a site for the Monitoredmore » Retrievable Storage facility. Watkins indicated that DOE has investigated an interim solution and decided to expedite a program to certify a multi-purpose standardized cask system for spent fuel receipt, storage, transport, and disposal. To meet the expectations of US utilities, DOE is considering a plan to use federal sites for interim storage of the casks. Secretary Watkins recommended the waste program be taken off-budget and put in a revolving fund established to ensure that money already collected from utilities will be available to meet the schedule for completion of the repository.« less
2013-10-30
This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.
The cost and impact of the interim federal health program cuts on child refugees in Canada.
Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin
2014-01-01
On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001). After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.
NASA Technical Reports Server (NTRS)
Truong, Long V.; Walters, Jerry L.; Roth, Mary Ellen; Quinn, Todd M.; Krawczonek, Walter M.
1990-01-01
The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control to the Space Station Freedom Electrical Power System (SSF/EPS) testbed being developed and demonstrated at NASA Lewis Research Center. The objectives of the program are to establish artificial intelligence technology paths, to craft knowledge-based tools with advanced human-operator interfaces for power systems, and to interface and integrate knowledge-based systems with conventional controllers. The Autonomous Power EXpert (APEX) portion of the APS program will integrate a knowledge-based fault diagnostic system and a power resource planner-scheduler. Then APEX will interface on-line with the SSF/EPS testbed and its Power Management Controller (PMC). The key tasks include establishing knowledge bases for system diagnostics, fault detection and isolation analysis, on-line information accessing through PMC, enhanced data management, and multiple-level, object-oriented operator displays. The first prototype of the diagnostic expert system for fault detection and isolation has been developed. The knowledge bases and the rule-based model that were developed for the Power Distribution Control Unit subsystem of the SSF/EPS testbed are described. A corresponding troubleshooting technique is also described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.
2013-09-01
A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This ismore » an interim report including about 2 years of post-desiccation monitoring data.« less
Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.
1983-03-07
The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.
NASA Astrophysics Data System (ADS)
Lin, Y. K.; Ke, M. C.; Ke, S. S.
2016-12-01
An active fault is commonly considered to be active if they have moved one or more times in the last 10,000 years and likely to have another earthquake sometime in the future. The relationship between the fault reactivation and the surface deformation after the Chi-Chi earthquake (M=7.2) in 1999 has been concerned up to now. According to the investigations of well-known disastrous earthquakes in recent years, indicated that surface deformation is controlled by the 3D fault geometric shape. Because the surface deformation may cause dangerous damage to critical infrastructures, buildings, roads, power, water and gas lines etc. Therefore it's very important to make pre-disaster risk assessment via the 3D active fault model to decrease serious economic losses, people injuries and deaths caused by large earthquake. The approaches to build up the 3D active fault model can be categorized as (1) field investigation (2) digitized profile data and (3) build the 3D modeling. In this research, we tracked the location of the fault scarp in the field first, then combined the seismic profiles (had been balanced) and historical earthquake data to build the underground fault plane model by using SKUA-GOCAD program. Finally compared the results come from trishear model (written by Richard W. Allmendinger, 2012) and PFC-3D program (Itasca) and got the calculated range of the deformation area. By analysis of the surface deformation area made from Hsin-Chu Fault, we concluded the result the damage zone is approaching 68 286m, the magnitude is 6.43, the offset is 0.6m. base on that to estimate the population casualties, building damage by the M=6.43 earthquake in Hsin-Chu area, Taiwan. In the future, in order to be applied accurately on earthquake disaster prevention, we need to consider further the groundwater effect and the soil structure interaction inducing by faulting.
On boundary-element models of elastic fault interaction
NASA Astrophysics Data System (ADS)
Becker, T. W.; Schott, B.
2002-12-01
We present the freely available, modular, and UNIX command-line based boundary-element program interact. It is yet another implementation of Crouch and Starfield's (1983) 2-D and Okada's (1992) half-space solutions for constant slip on planar fault segments in an elastic medium. Using unconstrained or non-negative, standard-package matrix routines, the code can solve for slip distributions on faults given stress boundary conditions, or vice versa, both in a local or global reference frame. Based on examples of complex fault geometries from structural geology, we discuss the effects of different stress boundary conditions on the predicted slip distributions of interacting fault systems. Such one-step calculations can be useful to estimate the moment-release efficiency of alternative fault geometries, and so to evaluate the likelihood which system may be realized in nature. A further application of the program is the simulation of cyclic fault rupture based on simple static-kinetic friction laws. We comment on two issues: First, that of the appropriate rupture algorithm. Cellular models of seismicity often employ an exhaustive rupture scheme: fault cells fail if some critical stress is reached, then cells slip once-only by a given amount, and subsequently the redistributed stress is used to check for triggered activations on other cells. We show that this procedure can lead to artificial complexity in seismicity if time-to-failure is not calculated carefully because of numerical noise. Second, we address the question if foreshocks can be viewed as direct expressions of a simple statistical distribution of frictional strength on individual faults. Repetitive failure models based on a random distribution of frictional coefficients initially show irregular seismicity. By repeatedly selecting weaker patches, the fault then evolves into a quasi-periodic cycle. Each time, the pre-mainshock events build up the cumulative moment release in a non-linear fashion. These temporal seismicity patterns roughly resemble the accelerated moment-release features which are sometimes observed in nature.
The PAWS and STEM reliability analysis programs
NASA Technical Reports Server (NTRS)
Butler, Ricky W.; Stevenson, Philip H.
1988-01-01
The PAWS and STEM programs are new design/validation tools. These programs provide a flexible, user-friendly, language-based interface for the input of Markov models describing the behavior of fault-tolerant computer systems. These programs produce exact solutions of the probability of system failure and provide a conservative estimate of the number of significant digits in the solution. PAWS uses a Pade approximation as a solution technique; STEM uses a Taylor series as a solution technique. Both programs have the capability to solve numerically stiff models. PAWS and STEM possess complementary properties with regard to their input space; and, an additional strength of these programs is that they accept input compatible with the SURE program. If used in conjunction with SURE, PAWS and STEM provide a powerful suite of programs to analyze the reliability of fault-tolerant computer systems.
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
Algorithm-Based Fault Tolerance Integrated with Replication
NASA Technical Reports Server (NTRS)
Some, Raphael; Rennels, David
2008-01-01
In a proposed approach to programming and utilization of commercial off-the-shelf computing equipment, a combination of algorithm-based fault tolerance (ABFT) and replication would be utilized to obtain high degrees of fault tolerance without incurring excessive costs. The basic idea of the proposed approach is to integrate ABFT with replication such that the algorithmic portions of computations would be protected by ABFT, and the logical portions by replication. ABFT is an extremely efficient, inexpensive, high-coverage technique for detecting and mitigating faults in computer systems used for algorithmic computations, but does not protect against errors in logical operations surrounding algorithms.
Mechanical Models of Fault-Related Folding
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, A. M.
2003-01-09
The subject of the proposed research is fault-related folding and ground deformation. The results are relevant to oil-producing structures throughout the world, to understanding of damage that has been observed along and near earthquake ruptures, and to earthquake-producing structures in California and other tectonically-active areas. The objectives of the proposed research were to provide both a unified, mechanical infrastructure for studies of fault-related foldings and to present the results in computer programs that have graphical users interfaces (GUIs) so that structural geologists and geophysicists can model a wide variety of fault-related folds (FaRFs).
NASA Technical Reports Server (NTRS)
Clune, E.; Segall, Z.; Siewiorek, D.
1984-01-01
A program of experiments has been conducted at NASA-Langley to test the fault-free performance of a Fault-Tolerant Multiprocessor (FTMP) avionics system for next-generation aircraft. Baseline measurements of an operating FTMP system were obtained with respect to the following parameters: instruction execution time, frame size, and the variation of clock ticks. The mechanisms of frame stretching were also investigated. The experimental results are summarized in a table. Areas of interest for future tests are identified, with emphasis given to the implementation of a synthetic workload generation mechanism on FTMP.
Analytical Approaches to Guide SLS Fault Management (FM) Development
NASA Technical Reports Server (NTRS)
Patterson, Jonathan D.
2012-01-01
Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).
Lane, Michael
2013-06-28
Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.
Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN
2008-10-14
An apparatus, program product and method checks for nodal faults in a row of nodes by causing each node in the row to concurrently communicate with its adjacent neighbor nodes in the row. The communications are analyzed to determine a presence of a faulty node or connection.
Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN
2012-02-07
An apparatus, program product and method check for nodal faults in a row of nodes by causing each node in the row to concurrently communicate with its adjacent neighbor nodes in the row. The communications are analyzed to determine a presence of a faulty node or connection.
Archer, Charles Jens; Pinnow, Kurt Walter; Ratterman, Joseph D.; Smith, Brian Edward
2010-02-23
An apparatus and program product check for nodal faults in a row of nodes by causing each node in the row to concurrently communicate with its adjacent neighbor nodes in the row. The communications are analyzed to determine a presence of a faulty node or connection.
NASA Technical Reports Server (NTRS)
Ferell, Bob; Lewis, Mark; Perotti, Jose; Oostdyk, Rebecca; Goerz, Jesse; Brown, Barbara
2010-01-01
This paper's main purpose is to detail issues and lessons learned regarding designing, integrating, and implementing Fault Detection Isolation and Recovery (FDIR) for Constellation Exploration Program (CxP) Ground Operations at Kennedy Space Center (KSC).
Hukerikar, Saurabh; Teranishi, Keita; Diniz, Pedro C.; ...
2017-02-11
In the presence of accelerated fault rates, which are projected to be the norm on future exascale systems, it will become increasingly difficult for high-performance computing (HPC) applications to accomplish useful computation. Due to the fault-oblivious nature of current HPC programming paradigms and execution environments, HPC applications are insufficiently equipped to deal with errors. We believe that HPC applications should be enabled with capabilities to actively search for and correct errors in their computations. The redundant multithreading (RMT) approach offers lightweight replicated execution streams of program instructions within the context of a single application process. Furthermore, the use of completemore » redundancy incurs significant overhead to the application performance.« less
Software fault-tolerance by design diversity DEDIX: A tool for experiments
NASA Technical Reports Server (NTRS)
Avizienis, A.; Gunningberg, P.; Kelly, J. P. J.; Lyu, R. T.; Strigini, L.; Traverse, P. J.; Tso, K. S.; Voges, U.
1986-01-01
The use of multiple versions of a computer program, independently designed from a common specification, to reduce the effects of an error is discussed. If these versions are designed by independent programming teams, it is expected that a fault in one version will not have the same behavior as any fault in the other versions. Since the errors in the output of the versions are different and uncorrelated, it is possible to run the versions concurrently, cross-check their results at prespecified points, and mask errors. A DEsign DIversity eXperiments (DEDIX) testbed was implemented to study the influence of common mode errors which can result in a failure of the entire system. The layered design of DEDIX and its decision algorithm are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hukerikar, Saurabh; Teranishi, Keita; Diniz, Pedro C.
In the presence of accelerated fault rates, which are projected to be the norm on future exascale systems, it will become increasingly difficult for high-performance computing (HPC) applications to accomplish useful computation. Due to the fault-oblivious nature of current HPC programming paradigms and execution environments, HPC applications are insufficiently equipped to deal with errors. We believe that HPC applications should be enabled with capabilities to actively search for and correct errors in their computations. The redundant multithreading (RMT) approach offers lightweight replicated execution streams of program instructions within the context of a single application process. Furthermore, the use of completemore » redundancy incurs significant overhead to the application performance.« less
Formal specification and mechanical verification of SIFT - A fault-tolerant flight control system
NASA Technical Reports Server (NTRS)
Melliar-Smith, P. M.; Schwartz, R. L.
1982-01-01
The paper describes the methodology being employed to demonstrate rigorously that the SIFT (software-implemented fault-tolerant) computer meets its requirements. The methodology uses a hierarchy of design specifications, expressed in the mathematical domain of multisorted first-order predicate calculus. The most abstract of these, from which almost all details of mechanization have been removed, represents the requirements on the system for reliability and intended functionality. Successive specifications in the hierarchy add design and implementation detail until the PASCAL programs implementing the SIFT executive are reached. A formal proof that a SIFT system in a 'safe' state operates correctly despite the presence of arbitrary faults has been completed all the way from the most abstract specifications to the PASCAL program.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Options. 35.120 Section 35.120... and Definitions for All Programs. § 35.120 Options. (a) Standard treatments. Where interim controls are required by this part, the designated party has the option to presume that lead-based paint or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area, California AGENCY... Act (CAA) Section 185 fee program (Termination Determination) for the Sacramento Metro 1- hour Ozone nonattainment area (Sacramento Metro Area) to satisfy anti- backsliding requirements for the 1-hour Ozone...
Tri-level study of the causes of traffic accidents : interim report 1. Vol. 1, research findings
DOT National Transportation Integrated Search
1973-08-31
This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University institute for Research in Public Safety ...
Cognitive Awareness Research in the Classroom
ERIC Educational Resources Information Center
Hogg, James H.
1975-01-01
A descriptive study to determine the continued effectiveness of a program of cognitive verbal awareness training was carried out over a three year period. It was found that ability to use cognitive verbalizations above the level of stating, or eliciting information remained whether or not interim feedback was given. (Author)
Tri-level study of the causes of traffic accidents : interim report 1. Vol. 2 : appendices
DOT National Transportation Integrated Search
1973-08-31
This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University Institute for Research in Public Safety ...
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...
The Interim Years of Cyberspace
2013-02-01
Atlantic Treaty Organization even went so far as to state that the Stuxnet worm could have caused “a new Chernobyl ” if the program had released the...Messmer, “Stuxnet Could Have Caused ‘New Chernobyl ,’ Russian Ambassador Says,” Network World, 27 January 2011, http://www.networkworld.com/news/2011/012711
2012-07-01
Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ). Another group contains documents relevant to site survey 3 procedures...residents of the contaminated areas. Recovery experience from the Chernobyl incident have demonstrated that direct involvement of inhabitants and local
2012-07-01
on the cleanup of specific sites: those containing only cesium-137 (Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ...targets and consider initiatives to enhance the quality of life of the residents of the contaminated areas. Recovery experience from the Chernobyl
DOT National Transportation Integrated Search
1981-01-01
This report describes a method for locating historic site information using a computer graphics program. If adopted for use by the Virginia Department of Highways and Transportation, this method should significantly reduce the time now required to de...
DOT National Transportation Integrated Search
1987-08-01
One of the primary reasons that highway departments are hesitant to use heat-straightening techniques to repair damaged steel girders is the lack of experimental verification of the process. A comprehensive experimental program on the subject has bee...
School, Work and Family Planning. Interim Impacts in Project Redirection.
ERIC Educational Resources Information Center
Polit, Denise F.; And Others
Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…
75 FR 16564 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... services to avoid shipping delays. Application forms are available at http://www.fra.dot.gov/Pages/2243..., and 501--Intercity Passenger Rail Service Corridor Capital Assistance (codified at 49 U.S.C. chapter... High Speed Rail Corridors and Intercity Passenger Rail Service.'' This document incorporates interim...
Academically Creative Education: An Interim Report.
ERIC Educational Resources Information Center
Southwest Virginia Community Coll., Richlands, VA.
An overview is provided of activities undertaken by Southwest Virginia Community College and the Russell County School System to provide a cost-effective delivery system for education/enrichment opportunities for gifted seniors in rural high schools that lack the "critical mass" to sustain individual on-site programs. The delivery system used an…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...
This cost-review approach applies to all program and PPG awards made under 40 CFR Part 35, Subpart A, where the recipient has an established, on-going grant relationship with EPA and has adequate internal controls in its personnel.
77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
...), Maritime Administration (MARAD), Pipeline and Hazardous Materials Safety Administration (PHSMA), Research... Research Program (23 U.S.C. 505). They may also use carryover balances from National Highway System funds... system's users and to the general public (for example, reductions in crashes, fatalities, and injuries...
Reading First Implementation Evaluation: Interim Report
ERIC Educational Resources Information Center
Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer
2006-01-01
In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM PROSPECTIVE PAYMENT SYSTEMS FOR... inpatient psychiatric facility receives payment under this subpart for inpatient operating cost and capital-related costs for each inpatient stay following submission of a bill. (b) Periodic interim payments (PIP...
CNN Newsroom Classroom Guides, February 2002.
ERIC Educational Resources Information Center
Cable News Network, Atlanta, GA.
These classroom guides, designed to accompany the daily CNN (Cable News Network) Newsroom broadcasts for the month of February 2002, provide program rundowns, suggestions for class activities and discussion, student handouts, and a list of related news terms. Top stories include: Afghanistan's interim leader is making a global impression (February…
CETA Demonstration Provides Lessons On Implementing Youth Programs.
1980-12-08
private sector participation, and labor market effects. In addition to a series of reports on specific issues and additional interim reports, MDRC...im, Mr. Gregory J. Ahat 4 1""yDm Director Alian Kotler Human Resources Division IDurid Ihuir U.S. General Accounting Office (.ijbr’E Sfrrw
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...
Expanding Job Opportunities for Alaska Natives. (Interim Report).
ERIC Educational Resources Information Center
McDiarmid, G. Williamson; Goldsmith, Scott; Killorin, Mary; Sharp, Suzanne; Hild, Carl
A majority of adults in most Alaska Native villages were without jobs in 1990, and the situation was probably not substantially better in 1998. This report summarizes current Alaska Native employment data and employment trends, provides information on public and private programs that target Native hire, and describes promising approaches for…
42 CFR 413.64 - Payments to providers: Specific rules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... small as possible. (c) Interim payments during initial reporting period. At the beginning of the program... experienced a temporary delay in preparing and submitting bills to the contractor beyond its normal billing.... Recovery of the accelerated payment may be made by recoupment as provider bills are processed or by direct...
Enterprise & Innovation. Teacher Resource Manual. Interim.
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
This teacher resource manual is a support document developed to assist teachers responsible for Enterprise and Innovation courses; it is intended to be used in conjunction with the corresponding program of studies in the curriculum for Alberta, Canada. The manual has been developed to assist classroom teachers by providing the following: (1)…