77 FR 36419 - Feasibility of Enumerating “Specially Designed” Components
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... feasibility of positively identifying ``specially designed'' ``components'' on the Commerce Control List (CCL... exhaustive lists of the ``specially designed'' ``components'' referred to in certain Export Control... project involving minimizing the use of the term ``specially designed'' on the current Commerce Control...
Learn about EPA’s use of the Integrated Planning Model (IPM) to develop estimates of SO2 and NOx emission control costs, projections of futureemissions, and projections of capacity of future control retrofits, assuming controls on EGUs.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... the treatment for project participants and, where feasible, for a comparison group of non... in the project (control group). The effect of the project is the average difference in outcomes between the treatment and control groups. Integrating means (i) encouraging the use of high-quality arts...
EVALUATION OF THE EFFECTS ON BENTHIC ORGANISMS FROM CLAY FLOCCULATION OF RED TIDE ORGANISMS
Evaluating the feasibility of controlling red tide using clay flocculation is part of an ECOHAB-funded project. One aspect for the feasibility and future application of clays is the determination of potential negative environmental impacts. The removal of toxin-containing dinofl...
Butnariu, Dan; Censor, Yair; Gurfil, Pini; Hadar, Ethan
2010-01-01
We study some methods of subgradient projections for solving a convex feasibility problem with general (not necessarily hyperplanes or half-spaces) convex sets in the inconsistent case and propose a strategy that controls the relaxation parameters in a specific self-adapting manner. This strategy leaves enough user-flexibility but gives a mathematical guarantee for the algorithm’s behavior in the inconsistent case. We present numerical results of computational experiments that illustrate the computational advantage of the new method. PMID:20182556
Butnariu, Dan; Censor, Yair; Gurfil, Pini; Hadar, Ethan
2008-07-03
We study some methods of subgradient projections for solving a convex feasibility problem with general (not necessarily hyperplanes or half-spaces) convex sets in the inconsistent case and propose a strategy that controls the relaxation parameters in a specific self-adapting manner. This strategy leaves enough user-flexibility but gives a mathematical guarantee for the algorithm's behavior in the inconsistent case. We present numerical results of computational experiments that illustrate the computational advantage of the new method.
Superiorization with level control
NASA Astrophysics Data System (ADS)
Cegielski, Andrzej; Al-Musallam, Fadhel
2017-04-01
The convex feasibility problem is to find a common point of a finite family of closed convex subsets. In many applications one requires something more, namely finding a common point of closed convex subsets which minimizes a continuous convex function. The latter requirement leads to an application of the superiorization methodology which is actually settled between methods for convex feasibility problem and the convex constrained minimization. Inspired by the superiorization idea we introduce a method which sequentially applies a long-step algorithm for a sequence of convex feasibility problems; the method employs quasi-nonexpansive operators as well as subgradient projections with level control and does not require evaluation of the metric projection. We replace a perturbation of the iterations (applied in the superiorization methodology) by a perturbation of the current level in minimizing the objective function. We consider the method in the Euclidean space in order to guarantee the strong convergence, although the method is well defined in a Hilbert space.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
..., Special Interest Project (SIP)13-067; and Feasibility Study of the New Clinical Measure of Colorectal... Determination of the Director, Management Analysis and Services Office, CDC, pursuant to Public Law 92-463... ``Understanding the Barriers to Colorectal Cancer Screening among Asian Subgroups, SIP13-067; and Feasibility...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-12
... Disadvantaged Communities, SIP11-041, Feasibility Study to Link Data from the National Breast and Cervical..., Management Analysis and Services Office, CDC, pursuant to Public Law 92-463. Matters To Be Discussed: The... Promote Colorectal Cancer Screening in Disadvantaged Communities, SIP11-041, Feasibility Study to Link...
1994-06-01
signals. Industrial robot controllers have several general purpose ports which can be programmed within manipulator program. In this way the gen ri...well as a fanc - tional end- effector was developed and evaluated. The workcell was found technologically feasible; however, further experimental work
The development of the Project NetWork administrative records database for policy evaluation.
Rupp, K; Driessen, D; Kornfeld, R; Wood, M
1999-01-01
This article describes the development of SSA's administrative records database for the Project NetWork return-to-work experiment targeting persons with disabilities. The article is part of a series of papers on the evaluation of the Project NetWork demonstration. In addition to 8,248 Project NetWork participants randomly assigned to receive case management services and a control group, the simulation identified 138,613 eligible nonparticipants in the demonstration areas. The output data files contain detailed monthly information on Supplemental Security Income (SSI) and Disability Insurance (DI) benefits, annual earnings, and a set of demographic and diagnostic variables. The data allow for the measurement of net outcomes and the analysis of factors affecting participation. The results suggest that it is feasible to simulate complex eligibility rules using administrative records, and create a clean and edited data file for a comprehensive and credible evaluation. The study shows that it is feasible to use administrative records data for selecting control or comparison groups in future demonstration evaluations.
Conducting Site and Economic Renewable Energy Project Feasibility Assessments
The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.
Can Young Children Make Active Choices? Outcomes of a Feasibility Trial in Seven-Year-Old Children
ERIC Educational Resources Information Center
Hands, Beth; Larkin, Dawne; Rose, Elizabeth; Parker, Helen; Smith, Anne
2011-01-01
This project evaluated the feasibility of a child-centred 24-week physical activity intervention. The "Play5" strategy encourages children to choose to play vigorously five times a day for about as long as school recess. The seven-year-old children were randomised to control (n = 176) or intervention groups (n = 132). Data were collected…
An interdisciplinary school project using a Nintendo Wii controller for measuring car speed
NASA Astrophysics Data System (ADS)
Hansen, Nils Kristian; Mitchell, James Robert
2013-03-01
This work examines the feasibility of employing a Nintendo Wii game controller for measuring car speed in an interdisciplinary school project. It discusses the physical characteristics of the controller and of vehicle headlights. It suggests how an experiment may be linked to topics in mathematics, statistics, physics and computer science. An algorithm for calculating speed from repeated recordings of car headlights is provided. Finally the results of repeated experiments with an approaching car are provided.
1984-08-01
Munesota. Flood Control Project (Geotechnical Cmmts). 2. Inclosed m ou resposes to the above-cited c ts. POt IT G0MVOAU: I Incl PC=U A. P13HR S Cdf...I . 4,! year period to house about 4b,O00 people in a self -contained community. Projections noted in the 1973 feasibility report were for a total...incorporation of trails for nature study, hiking, self -propelled bicycle, horseback riding, snowshoe, cross- country ski, and access by fishermen and
DOT National Transportation Integrated Search
2015-07-01
Highway construction takes place in remote locations, making document control challenging. Frequent changes in a project can cause errors, : reworks, and schedule delays due to the time taken to disseminate these changes to the field or due to using ...
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-07-01
The report presents the results of a feasibility study for the National Load Dispatch Center and Global Communications System Project in Guatemala. The project consists of a communication system which will provide Institute Nacional de Electrificacion (INDE) operations personnel direct voice access to all major power system facilities. In addition, a modern computer based load dispatch center has been configured on a secure and reliable basis to provide automatic generation control of all major interconnected generating plants within Guatemala.
1983-12-01
therefore, any possible changes in floodplain regulation would be independent of project implementation. The existing regulation affects properties...to 0.4. Based on engineering experience there is a tendency toward independence as tributary drainage area size decreases. Frequency-discharge...stages on the Wisconsin River. Similarly the storage areas are analyzed as independent syste,, o thereby, reduction in flood elevations (routing) and
DOT National Transportation Integrated Search
2017-10-01
The purpose of this research study is to determine if the implementation of FTIRS in Louisiana for determining polymer content in asphalt mixtures and for quality control of recycled asphalt mixtures is feasible. The ultimate objective is to develop ...
Feasibility analysis of base compaction specification : [project brief].
DOT National Transportation Integrated Search
2013-02-01
Appropriate design and construction of the aggregate base layer has significant influence on : structural stability and performance of pavements. Controlling the construction quality of : the granular base layer is important to achieve long-lasting p...
7 CFR 4279.261 - Application for loan guarantee content.
Code of Federal Regulations, 2012 CFR
2012-01-01
... project; (2) The viability of such technology for the particular project application; (3) The development... location, size, etc.). Economic feasibility determination. Market feasibility determination. Technical.... Recommendations for implementation. (B) Economic Feasibility: Information regarding project site; Availability of...
Flash LIDAR Emulator for HIL Simulation
NASA Technical Reports Server (NTRS)
Brewster, Paul F.
2010-01-01
NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) project is building a system for detecting hazards and automatically landing controlled vehicles safely anywhere on the Moon. The Flash Light Detection And Ranging (LIDAR) sensor is used to create on-the-fly a 3D map of the unknown terrain for hazard detection. As part of the ALHAT project, a hardware-in-the-loop (HIL) simulation testbed was developed to test the data processing, guidance, and navigation algorithms in real-time to prove their feasibility for flight. Replacing the Flash LIDAR camera with an emulator in the testbed provided a cheaper, safer, more feasible way to test the algorithms in a controlled environment. This emulator must have the same hardware interfaces as the LIDAR camera, have the same performance characteristics, and produce images similar in quality to the camera. This presentation describes the issues involved and the techniques used to create a real-time flash LIDAR emulator to support HIL simulation.
Laminar flow control SPF/08 feasibility demonstration
NASA Astrophysics Data System (ADS)
Ecklund, R. C.; Williams, N. R.
1981-10-01
The feasibility of applying superplastic forming/diffusion bonding (SPF/DB) technology to laminar flow control (LFC) system concepts was demonstrated. Procedures were developed to produce smooth, flat titanium panels, using thin -0.016 inch sheets, meeting LFC surface smoothness requirements. Two large panels 28 x 28 inches were fabricated as final demonstration articles. The first was flat on the top and bottom sides demonstrating the capability of the tooling and the forming and diffusion bonding procedures to produce flat, defect free surfaces. The second panel was configurated for LFC porous panel treatment by forming channels with dimpled projections on the top side. The projections were machined away leaving holes extending into the panel. A perforated titanium sheet was adhesively bonded over this surface to complete the LFC demonstration panel. The final surface was considered flat enough to meet LFC requirements for a jet transport aircraft in cruising flight.
7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2013 CFR
2013-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2014 CFR
2014-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2012 CFR
2012-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
NASA Technical Reports Server (NTRS)
Hsia, Wei-Shen
1986-01-01
In the Control Systems Division of the Systems Dynamics Laboratory of the NASA/MSFC, a Ground Facility (GF), in which the dynamics and control system concepts being considered for Large Space Structures (LSS) applications can be verified, was designed and built. One of the important aspects of the GF is to design an analytical model which will be as close to experimental data as possible so that a feasible control law can be generated. Using Hyland's Maximum Entropy/Optimal Projection Approach, a procedure was developed in which the maximum entropy principle is used for stochastic modeling and the optimal projection technique is used for a reduced-order dynamic compensator design for a high-order plant.
1981-09-01
Jackson Street intersection to allow service vehicle access and passenger load- ing facilities at Lambert’s Landing across the river from the project...river from the project. Realignment of the Warner-Shepard Road, Sibley- Jackson Street intersection to allow service vehicle access and passenger...7-9 Ingersoll, F. G.: Member Jackson , J. N.: Member Jaggard, E. A.: Minnesota Supreme Court Justice Member 1890’s -1910’s, President 1893 James, H. C
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Jennifer
The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownershipmore » for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.« less
Projection pursuit water quality evaluation model based on chicken swam algorithm
NASA Astrophysics Data System (ADS)
Hu, Zhe
2018-03-01
In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.
Tupasi, Thelma E; Gupta, Rajesh; Quelapio, Ma Imelda D; Orillaza, Ruth B; Mira, Nona Rachel; Mangubat, Nellie V; Belen, Virgil; Arnisto, Nida; Macalintal, Lualhati; Arabit, Michael; Lagahid, Jaime Y; Espinal, Marcos; Floyd, Katherine
2006-01-01
Background Multidrug-resistant tuberculosis (MDR-TB) is an important global health problem, and a control strategy known as DOTS-Plus has existed since 1999. However, evidence regarding the feasibility, effectiveness, cost, and cost-effectiveness of DOTS-Plus is still limited. Methodology/Principal Findings We evaluated the feasibility, effectiveness, cost, and cost-effectiveness of a DOTS-Plus pilot project established at Makati Medical Center in Manila, the Philippines, in 1999. Patients with MDR-TB are treated with regimens, including first- and second-line drugs, tailored to their drug susceptibility pattern (i.e., individualised treatment). We considered the cohort enrolled between April 1999 and March 2002. During this three-year period, 118 patients were enrolled in the project; 117 were considered in the analysis. Seventy-one patients (61%) were cured, 12 (10%) failed treatment, 18 (15%) died, and 16 (14%) defaulted. The average cost per patient treated was US$3,355 from the perspective of the health system, of which US$1,557 was for drugs, and US$837 from the perspective of patients. The mean cost per disability-adjusted life year (DALY) gained by the DOTS-Plus project was US$242 (range US$85 to US$426). Conclusions Treatment of patients with MDR-TB using the DOTS-Plus strategy and individualised drug regimens can be feasible, comparatively effective, and cost-effective in low- and middle-income countries. PMID:16968123
Tupasi, Thelma E; Gupta, Rajesh; Quelapio, Ma Imelda D; Orillaza, Ruth B; Mira, Nona Rachel; Mangubat, Nellie V; Belen, Virgil; Arnisto, Nida; Macalintal, Lualhati; Arabit, Michael; Lagahid, Jaime Y; Espinal, Marcos; Floyd, Katherine
2006-09-01
Multidrug-resistant tuberculosis (MDR-TB) is an important global health problem, and a control strategy known as DOTS-Plus has existed since 1999. However, evidence regarding the feasibility, effectiveness, cost, and cost-effectiveness of DOTS-Plus is still limited. We evaluated the feasibility, effectiveness, cost, and cost-effectiveness of a DOTS-Plus pilot project established at Makati Medical Center in Manila, the Philippines, in 1999. Patients with MDR-TB are treated with regimens, including first- and second-line drugs, tailored to their drug susceptibility pattern (i.e., individualised treatment). We considered the cohort enrolled between April 1999 and March 2002. During this three-year period, 118 patients were enrolled in the project; 117 were considered in the analysis. Seventy-one patients (61%) were cured, 12 (10%) failed treatment, 18 (15%) died, and 16 (14%) defaulted. The average cost per patient treated was US3,355 dollars from the perspective of the health system, of which US1,557 dollars was for drugs, and US837 dollars from the perspective of patients. The mean cost per disability-adjusted life year (DALY) gained by the DOTS-Plus project was US242 dollars (range US85 dollars to US426 dollars). Treatment of patients with MDR-TB using the DOTS-Plus strategy and individualised drug regimens can be feasible, comparatively effective, and cost-effective in low- and middle-income countries.
DOT National Transportation Integrated Search
2014-01-01
Noise is an important issue in freight delivery. In the implementation of the Off-Hour Delivery (OHD) : Project, the noise problem became increasingly prominent. Effective noise control not only facilitates : OHD, it also improves the community envir...
Investigation and Feasibility Assessment of TOPAZ-2 Derivations for Space Power Applications
NASA Technical Reports Server (NTRS)
Parlos, Alexander G.; Peddicord, Kenneth L.
1998-01-01
The ability to provide continuous power at significant levels is of utmost importance for many space missions, from simple satellite operations to manned Mars missions. One of the main problems faced in delivering solar or chemical space power in the tens of kW range, is the increasingly massive nature of the power source and the costs associated with its launch, operation and maintenance. A national program had been initiated to study the feasibility of using certain advanced technologies in developing an efficient lightweight space power source. The starting point for these studies has been the Russian TOPAZ-2 space reactor system, with the ultimate goal to aid in the development of a TOPAZ-2 derivative which will be ready for flight by the year 2000. The main objective of this project has been to perform feasibility assessment and trade studies which would allow the development of an advanced space nuclear power system based on the in-core thermionic fuel element technology currently used in the Russian TOPAZ-2 reactor. Two of the important considerations in developing the concept are: (1) compliance of the current TOPAZ-2 and of any advanced designs with U.S. nuclear safety expectations, and (2) compliance of the design with the seven years lifetime requirement. The project was composed of two major phases. The initial phase of the project has concentrated on understanding the TOPAZ-2 thermionic reactor in sufficient detail to allow several follow-on tasks. The primary interest during this first phase has been given on identifying the potential of the TOPAZ-2 design for further improvements. The second phase of the project has focused on the feasibility of a TOPAZ-2 system capable of delivering 30-50 kWe. Towards the elimination of single-point failures in the load voltage regulation system an active voltage regulator has been designed to be used in conjunction with the available shunt load voltage regulator. The possible use of a dual-loop, model-based adaptive control system for load-following in the TOPAZ-2 has also been investigated. The objective of this fault-tolerant, autonomous control system is to deliver the demanded electric power at the desired voltage level, by appropriately manipulating the neutron power through the control drums. As a result, sufficient thermal power is produced to meet the required demand in the presence of dynamically changing system operating conditions and potential sensor failures. The designed controller is proposed for use in combination with the currently available shunt regulators, or as a back-up controller when other means of power system control, including some of the sensors, fail.
13 CFR 130.330 - Operating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assessment and evaluation, and internal quality control. (c) The Lead Center shall be open to the public... provide administrative services and coordination for the SBDC network, including program development... Project Officer as soon as is feasible. Other SBDC service providers shall be open during the normal...
HORIZONTAL HYBRID SOLAR LIGHT PIPE: AN INTEGRATED SYSTEM OF DAYLIGHT AND ELECTRIC LIGHT
This project will test the feasibility of an advanced energy efficient perimeter lighting system that integrates daylighting, electric lighting, and lighting controls to reduce electricity consumption. The system is designed to provide adequate illuminance levels in deep-floor...
Project Cerberus: Flyby Mission to Pluto
NASA Technical Reports Server (NTRS)
Sivier, K.; Koepke, A.; Humphrey, Theodore W.; Elbel, Jeffrey P.; Hackett, Bruce E.; Kennedy, Ralph G.; Leo, Donald J.; Zimmerman, Shery A.
1990-01-01
The goal of the Cerberus Project was to design a feasible and cost-effective unmanned flyby mission to Pluto. The requirements in the request for proposal for an unmanned probe to Pluto are presented and were met. The design stresses proven technology that will avoid show stoppers which could halt mission progress. Cerberus also utilizes the latest advances in the spacecraft industry to meet the stringent demands of the mission. The topics covered include: (1) mission management, planning, and costing; (2) structures; (3) power and propulsion; (4) attitude, articulation, and control; (5) command, control, and communication; and (6) scientific instrumentation.
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
Landfill Gas Energy Cost Model Version 3.0 (LFGcost-Web V3 ...
To help stakeholders estimate the costs of a landfill gas (LFG) energy project, in 2002, LMOP developed a cost tool (LFGcost). Since then, LMOP has routinely updated the tool to reflect changes in the LFG energy industry. Initially the model was designed for EPA to assist landfills in evaluating the economic and financial feasibility of LFG energy project development. In 2014, LMOP developed a public version of the model, LFGcost-Web (Version 3.0), to allow landfill and industry stakeholders to evaluate project feasibility on their own. LFGcost-Web can analyze costs for 12 energy recovery project types. These project costs can be estimated with or without the costs of a gas collection and control system (GCCS). The EPA used select equations from LFGcost-Web to estimate costs of the regulatory options in the 2015 proposed revisions to the MSW Landfills Standards of Performance (also known as New Source Performance Standards) and the Emission Guidelines (herein thereafter referred to collectively as the Landfill Rules). More specifically, equations derived from LFGcost-Web were applied to each landfill expected to be impacted by the Landfill Rules to estimate annualized installed capital costs and annual O&M costs of a gas collection and control system. In addition, after applying the LFGcost-Web equations to the list of landfills expected to require a GCCS in year 2025 as a result of the proposed Landfill Rules, the regulatory analysis evaluated whether electr
Li, Hong-Jiao; He, Li-Yun; Liu, Zhi-Shun; Sun, Ya-Nan; Yan, Shi-Yan; Liu, Jia; Zhao, Ye; Liu, Bao-Yan
2014-02-01
To effectively guarantee quality of randomized controlld trial (RCT) of acupuncture and develop reasonable content and checklist of on-site quality control, influencing factors on quality of acupuncture RCT are analyzed and scientificity of quality control content and feasibility of on-site manipulation are put into overall consideration. Based on content and checklist of on-site quality control in National 11th Five-Year Plan Project Optimization of Comprehensive Treatment Plan for TCM in Prevention and Treatment of Serious Disease and Clinical Assessment on Generic Technology and Quality Control Research, it is proposed that on-site quality control of acupuncture RCT should be conducted with PICOST (patient, intervention, comparison, out come, site and time) as core, especially on quality control of interveners' skills and outcome assessment of blinding, and checklist of on-site quality control is developed to provide references for undertaking groups of the project.
The use of UNIX in a real-time environment
NASA Technical Reports Server (NTRS)
Luken, R. D.; Simons, P. C.
1986-01-01
This paper describes a project to evaluate the feasibility of using commercial off-the-shelf hardware and the UNIX operating system, to implement a real-time control and monitor system. A functional subset of the Checkout, Control and Monitor System was chosen as the test bed for the project. The project consists of three separate architecture implementations: a local area bus network, a star network, and a central host. The motivation for this project stemmed from the need to find a way to implement real-time systems, without the cost burden of developing and maintaining custom hardware and unique software. This has always been accepted as the only option because of the need to optimize the implementation for performance. However, with the cost/performance of today's hardware, the inefficiencies of high-level languages and portable operating systems can be effectively overcome.
Middle Sacramento River Refuge: A Feasibility Study
Charles J. Houghten; Frank J. Michny
1989-01-01
The woodlands and other streamside habitat of the Sacramento River's riparian system have been severely reduced within the last century. This riparian habitat and its ability to sustain diverse populations of fish, migratory birds, mammals, and other wildlife have been significantly impacted by water control projects, agricultural developments, and other land uses...
7 CFR 634.14 - Review and approval of project applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... quality, (3) Economic, and technical feasibility to control water quality problems within the life of the... and recommending priorities, the NRCWCC will consider the following: (1) Severity of the water quality...) Effects on human health, (ii) Population benefited by improved water quality, (iii) Effects on the natural...
7 CFR 634.14 - Review and approval of project applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... quality, (3) Economic, and technical feasibility to control water quality problems within the life of the... and recommending priorities, the NRCWCC will consider the following: (1) Severity of the water quality...) Effects on human health, (ii) Population benefited by improved water quality, (iii) Effects on the natural...
7 CFR 634.14 - Review and approval of project applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... quality, (3) Economic, and technical feasibility to control water quality problems within the life of the... and recommending priorities, the NRCWCC will consider the following: (1) Severity of the water quality...) Effects on human health, (ii) Population benefited by improved water quality, (iii) Effects on the natural...
7 CFR 634.14 - Review and approval of project applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... quality, (3) Economic, and technical feasibility to control water quality problems within the life of the... and recommending priorities, the NRCWCC will consider the following: (1) Severity of the water quality...) Effects on human health, (ii) Population benefited by improved water quality, (iii) Effects on the natural...
7 CFR 634.14 - Review and approval of project applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... quality, (3) Economic, and technical feasibility to control water quality problems within the life of the... and recommending priorities, the NRCWCC will consider the following: (1) Severity of the water quality...) Effects on human health, (ii) Population benefited by improved water quality, (iii) Effects on the natural...
32 CFR 644.6 - Feasibility Reports and Design Memoranda.
Code of Federal Regulations, 2010 CFR
2010-07-01
... interest required for project purposes, and views of the local representative of the controlling agency as... estimate of all costs, including contingencies to be incurred as a result of compliance with Pub. L. 91-646..., contingencies, administrative costs, etc. (P) Schedule of acquisition. (Q) Discussion and recommendations...
Development of Microcomputer Simulations for Vocational/Technical Education. Final Report.
ERIC Educational Resources Information Center
Randolph Technical Coll., Asheboro, NC.
A project investigated the feasibility of developing equipment simulations in vocational curricula using videotapes and microcomputers. To conduct the research, two pieces of equipment that could be used in vocational curricula throughout the North Carolina Community College System were chosen: (1) computer numerical control (CNC) lathe used in…
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
The feasibility of remote-controlled assistance as a search tool for patient education.
Lin, I K; Bray, B E; Smith, J A; Lange, L L
2001-01-01
Patients often desire more information about their conditions than they receive during a physician office visit. To address the patient's information needs, a touchscreen information kiosk was implemented. Results from the first prototype identified interface, security, and technical issues. Misspelling of search terms was identified as the most observable cause of search failure. An experimental remote control assistance feature was added in the second prototype. The feature allowed a medical librarian to provide real-time remote help during searches by taking control of the patient's computer. Remote assistance improved patient satisfaction, increased ease of use, and raised document retrieval rate (86.7% vs. 56.7%). Both patients and librarians found the application useful. Reasons included its convenience and flexibility, opportunity for direct patient contact, ability to teach through direct demonstration, and complementing the librarian's role as an information gateway. The project demonstrated the feasibility of applying remote control technology to patient education.
Radioactive waste management complex low-level waste radiological composite analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCarthy, J.M.; Becker, B.H.; Magnuson, S.O.
1998-05-01
The composite analysis estimates the projected cumulative impacts to future members of the public from the disposal of low-level radioactive waste (LLW) at the Idaho National Engineering and Environmental Laboratory (INEEL) Radioactive Waste Management Complex (RWMC) and all other sources of radioactive contamination at the INEEL that could interact with the LLW disposal facility to affect the radiological dose. Based upon the composite analysis evaluation, waste buried in the Subsurface Disposal Area (SDA) at the RWMC is the only source at the INEEL that will significantly interact with the LLW facility. The source term used in the composite analysis consistsmore » of all historical SDA subsurface disposals of radionuclides as well as the authorized LLW subsurface disposal inventory and projected LLW subsurface disposal inventory. Exposure scenarios evaluated in the composite analysis include all the all-pathways and groundwater protection scenarios. The projected dose of 58 mrem/yr exceeds the composite analysis guidance dose constraint of 30 mrem/yr; therefore, an options analysis was conducted to determine the feasibility of reducing the projected annual dose. Three options for creating such a reduction were considered: (1) lowering infiltration of precipitation through the waste by providing a better cover, (2) maintaining control over the RWMC and portions of the INEEL indefinitely, and (3) extending the period of institutional control beyond the 100 years assumed in the composite analysis. Of the three options investigated, maintaining control over the RWMC and a small part of the present INEEL appears to be feasible and cost effective.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cook, W.J.; Brown, W.R.; Siwajek, L.
1998-09-01
The project is a landfill gas to energy project rated at about 4 megawatts (electric) at startup, increasing to 8 megawatts over time. The project site is Boului Landfill, near Bucharest, Romania. The project improves regional air quality, reduces emission of greenhouse gases, controls and utilizes landfill methane, and supplies electric power to the local grid. The technical and economic feasibility of pre-treating Boului landfill gas with Acrion`s new landfill gas cleanup technology prior to combustion for power production us attractive. Acrion`s gas treatment provides several benefits to the currently structured electric generation project: (1) increase energy density of landfillmore » gas from about 500 Btu/ft{sup 3} to about 750 Btu/ft{sup 3}; (2) remove contaminants from landfill gas to prolong engine life and reduce maintenance;; (3) recover carbon dioxide from landfill gas for Romanian markets; and (4) reduce emission of greenhouse gases methane and carbon dioxide. Greenhouse gas emissions reduction attributable to successful implementation of the landfill gas to electric project, with commercial liquid CO{sub 2} recovery, is estimated to be 53 million metric tons of CO{sub 2} equivalent of its 15 year life.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Upchurch, J.L.
In order to better meet the challenges associated with downsizing and because of the ongoing need to control costs and accelerate project development many companies are trying new and different strategies in managing projects. For the Seastar Project, Phillips adopted a total team approach. The goal of this approach was to develop a win/win attitude for all of the personnel (Phillips, Engineering Contractor and Equipment Vendors) involved in the project. By bringing all the personnel together and focusing on project success it was thought that costs could be better controlled and that the development schedule could be accelerated. The Seastarmore » Project is a two well subsea development located in Garden Banks Blocks 70 and 71 approximately 120 miles south of Cameron Louisiana. Phillips took over operatorship in 1992 and drilled Garden Banks Block 71 No. 2, which discovered 349 feet of net gas pay in April 1993. Following a successful drill stem test on GB 71 No. 2, drilling was started on an appraisal well and work began on a feasibility study to define development options.« less
Backman, Chantal; Bruce, Natalie; Marck, Patricia; Vanderloo, Saskia
2016-01-01
The purpose of this quality improvement project was to determine the feasibility of using provider-led participatory visual methods to scrutinize 4 hospital units' infection prevention and control practices. Methods included provider-led photo walkabouts, photo elicitation sessions, and postimprovement photo walkabouts. Nurses readily engaged in using the methods to examine and improve their units' practices and reorganize their work environment.
1985-07-01
and Operation 132 6.7.5 Safety 135 6.7.6 System Control Description 136 6.7.6.1 Coal Gasification 136 6.7.6.2 Gas Cooling, Cleaning and Compression...the hydrogen content. The gas is then desulfurized and heated before final polishing and feeding to the fuel cell. Receiving compressed fuel gas and...4 CO Shift 1 Stretford Desulfurizer 3 Gas Compressors 3 Material Handling(3) 3 Subtotal 39 Scheduled Shutdown 14 Total Annual Shutdown 53
Ground-Based High Energy Power Beaming in Support of Spacecraft Power Requirements
2006-06-01
provide 900 W/m2. As more of the arriving energy is converted to space bus power and less goes into the production of heat , more solar cell output...similar control of peak power levels. Efficiency of power transfer may easily be about 50% as the solar cell experiences less heating effects as the...investigates the feasibility of projecting ground-based laser power to energize a spacecraft electrical bus via the solar panels. The energy is projected
Dynamic Controllability and Dispatchability Relationships
NASA Technical Reports Server (NTRS)
Morris, Paul Henry
2014-01-01
An important issue for temporal planners is the ability to handle temporal uncertainty. Recent papers have addressed the question of how to tell whether a temporal network is Dynamically Controllable, i.e., whether the temporal requirements are feasible in the light of uncertain durations of some processes. We present a fast algorithm for Dynamic Controllability. We also note a correspondence between the reduction steps in the algorithm and the operations involved in converting the projections to dispatchable form. This has implications for the complexity for sparse networks.
Distributed observing facility for remote access to multiple telescopes
NASA Astrophysics Data System (ADS)
Callegari, Massimo; Panciatici, Antonio; Pasian, Fabio; Pucillo, Mauro; Santin, Paolo; Aro, Simo; Linde, Peter; Duran, Maria A.; Rodriguez, Jose A.; Genova, Francoise; Ochsenbein, Francois; Ponz, J. D.; Talavera, Antonio
2000-06-01
The REMOT (Remote Experiment Monitoring and conTrol) project was financed by 1996 by the European Community in order to investigate the possibility of generalizing the remote access to scientific instruments. After the feasibility of this idea was demonstrated, the DYNACORE (DYNAmically, COnfigurable Remote Experiment monitoring and control) project was initiated as a REMOT follow-up. Its purpose is to develop software technology to support scientists in two different domains, astronomy and plasma physics. The resulting system allows (1) simultaneous multiple user access to different experimental facilities, (2) dynamic adaptability to different kinds of real instruments, (3) exploitation of the communication infrastructures features, (4) ease of use through intuitive graphical interfaces, and (5) additional inter-user communication using off-the-shelf projects such as video-conference tools, chat programs and shared blackboards.
[Microfiche/Audiotape and Teeth. An Experimental Trial of New Technology: The Second Year.
ERIC Educational Resources Information Center
Dills, Charles R.; Bass, Ronald K.
Two papers describe a 3-year project being conducted to evaluate the feasibility of replacing traditional slide-tape materials in a criterion-referenced, modularized, self-paced curriculum in dentistry with color microfiche and audiotapes. The experimental materials are being used with a microfiche-audiotape unit controlled by a microprocessor.…
DOT National Transportation Integrated Search
2017-03-01
The objective of the study was to demonstrate the feasibility of using bi-directional layouts of CFRP for shear : strengthening of bridge girders. In a previous project (0-6306), it was demonstrated that uni-directional CFRP : strips and CFRP anchors...
ELSA- The European Levitated Spherical Actruator
NASA Astrophysics Data System (ADS)
Ruiz, M.; Serin, J.; Telteu-Nedelcu, D.; De La Vallee Poussin, H.; Onillon, E.; Rossini, L.
2014-08-01
The reaction sphere is a magnetic bearing spherical actuator consisting of a permanent magnet spherical rotor that can be accelerated in any direction. It consists of an 8-pole permanent magnet spherical rotor that is magnetically levitated and can be accelerated about any axis by a 20-pole stator with electromagnets. The spherical actuator is proposed as a potential alternative to traditional momentum exchange devices such as reaction wheels (RWs) or control moment gyroscopes (CMGs). This new actuator provides several benefits such as reduced mass and power supply allocated to the attitude and navigation unit, performance gain, and improved reliability due to the absence of mechanical bearings. The paper presents the work done on the levitated spherical actuator and more precisely the electrical drive including its control unit and power parts. An elegant breadboard is currently being manufactured within the frame of an FP7 project. This project also comprises a feasibility study to show the feasibility of integrating such a system on a flight platform and to identify all the challenges to be solved in terms of technology or components to be developed.
7 CFR 4280.21 - Eligible REDG Ultimate Recipients and Projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... facilitate medical or educational services or job training; or (6) Project feasibility studies and Technical Assistance. A qualified Independent Provider must perform feasibility studies or Technical Assistance. (b...
NASA Astrophysics Data System (ADS)
Saputra, Y. A.; Setyaningtyas, V. E. D.; Latiffianti, E.; Wijaya, S. H.; Ladamay, O. S. A.
2018-04-01
Measuring project success level is a challenging activity. This area of works has attracted many researchers to look deeper into the method of measurement, success factor identification, risk management, and many others relevant topics. However, the project management scope is limited until the project handover stage. After a project handover, the control of a project management changes from Project Management Team to the project owner/commercialization team. From an investor’s point of view, the success of a project delivery needs to be followed by the success of commercialization phase. This paper aims to present an approach on how we track and measure the progress and success level of a project investment in the commercialization phase. This is an interesting topic which probably often being forgotten in many practical case. Our proposed concept modify Freeman and Beale concept by estimating the variance between the Planned Net Present Value / Annual Worth (as it is in the Feasibility Study Document) and the Actual Net Present Value / Annual Worth (until the point time of evaluation). The gap will lead us to the next analysis and give us some important information, especially exposing whether our project investment performs better than the planning or underperformed. Some corrective actions can be suggested based on the provided information. Practical cases to exercise the concept is also provided and discussed; one case in a property sector in the middle of commercialization phase, and another case in a Power Plant investment approaching the end of commercialization phase.
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
Final Technical Report: Renewable Energy Feasibility Study and Resources Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivero, Mariah
In March 2011, the U.S. Department of Energy (DOE) awarded White Pine County, Nevada, a grant to assess the feasibility of renewable resource-related economic development activities in the area. The grant project included a public outreach and training component and was to include a demonstration project; however, the demonstration project was not completed due to lack of identification of an entity willing to locate a project in White Pine County. White Pine County completed the assessment of renewable resources and a feasibility study on the potential for a renewable energy-focused economic sector within the County. The feasibility study concluded "allmore » resources studied were present and in sufficient quantity and quality to warrant consideration for development" and there were varying degrees of potential economic impact based on the resource type and project size. The feasibility study and its components were to be used as tools to attract potential developers and other business ventures to the local market. White Pine County also marketed the County’s resources to the renewable energy business community in an effort to develop contracts for demonstration projects. The County also worked to develop partnerships with local educational institutions, including the White Pine County School District, conducted outreach and training for the local community.« less
Sebastião, Emerson; McAuley, Edward; Shigematsu, Ryosuke; Motl, Robert W
2017-09-01
We propose a randomized controlled trial (RCT) examining the feasibility of square-stepping exercise (SSE) delivered as a home-based program for older adults with multiple sclerosis (MS). We will assess feasibility in the four domains of process, resources, management and scientific outcomes. The trial will recruit older adults (aged 60 years and older) with mild-to-moderate MS-related disability who will be randomized into intervention or attention control conditions. Participants will complete assessments before and after completion of the conditions delivered over a 12-week period. Participants in the intervention group will have biweekly meetings with an exercise trainer in the Exercise Neuroscience Research Laboratory and receive verbal and visual instruction on step patterns for the SSE program. Participants will receive a mat for home-based practice of the step patterns, an instruction manual, and a logbook and pedometer for monitoring compliance. Compliance will be further monitored through weekly scheduled Skype calls. This feasibility study will inform future phase II and III RCTs that determine the actual efficacy and effectiveness of a home-based exercise program for older adults with MS.
Renewable Energy Feasibility Study Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rooney, Tim
2013-10-30
The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including: Technical appropriateness; Solar resource characteristics and expected system performance; Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARESmore » Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including: Resource analysis and costs; Identification of potential bioenergy projects; Technical and economic (levelized cost of energy) modeling for selected project configuration.« less
Feasibility of Using Plastic Pipe for Ethanol Low Stress Lines
DOT National Transportation Integrated Search
2010-05-28
This USDOT PHMSA sponsored research project addressed and successfully determined the initial feasibility of using new materials, both polymeric and composites, as low-cost alternatives to specially designed metallic gathering pipelines. The project ...
Water reuse in the Apatlaco River Basin (México): a feasibility study.
Moeller-Chávez, G; Seguí-Amórtegui, L; Alfranca-Burriel, O; Escalante-Estrada, V; Pozo-Román, F; Rivas-Hernández, A
2004-01-01
The aim of this work is to determine the technical and economic feasibility of implementing different reclamation and reuse projects that improve the quality of the Apatlaco river basin located in the central part of Mexico. A special methodology based on a decision support system was developed. This methodology allows to decide if it is convenient or not to finance a reclamation or reuse project for the most common water uses in the basin. This methodology is based on the net present value criteria (NPV) of the effective cash flow during the useful life of the project. The results obtained reveal a technical and economical feasibility for industrial reuse in Jiutepec and for agricultural reuse in Zacatepec and Emiliano Zapata. On the other hand, sanitation projects are not feasible in all cases analyzed. Therefore, Mexican Regulation (Ley Federal de Derechos en Materia de Agua) as currently implemented, does not promote and support this kind of projects.
Suppes, T; Swann, A C; Dennehy, E B; Habermacher, E D; Mason, M; Crismon, M L; Toprac, M G; Rush, A J; Shon, S P; Altshuler, K Z
2001-06-01
Use of treatment guidelines for treatment of major psychiatric illnesses has increased in recent years. The Texas Medication Algorithm Project (TMAP) was developed to study the feasibility and process of developing and implementing guidelines for bipolar disorder, major depressive disorder, and schizophrenia in the public mental health system of Texas. This article describes the consensus process used to develop the first set of TMAP algorithms for the Bipolar Disorder Module (Phase 1) and the trial testing the feasibility of their implementation in inpatient and outpatient psychiatric settings across Texas (Phase 2). The feasibility trial answered core questions regarding implementation of treatment guidelines for bipolar disorder. A total of 69 patients were treated with the original algorithms for bipolar disorder developed in Phase 1 of TMAP. Results support that physicians accepted the guidelines, followed recommendations to see patients at certain intervals, and utilized sequenced treatment steps differentially over the course of treatment. While improvements in clinical symptoms (24-item Brief Psychiatric Rating Scale) were observed over the course of enrollment in the trial, these conclusions are limited by the fact that physician volunteers were utilized for both treatment and ratings. and there was no control group. Results from Phases 1 and 2 indicate that it is possible to develop and implement a treatment guideline for patients with a history of mania in public mental health clinics in Texas. TMAP Phase 3, a recently completed larger and controlled trial assessing the clinical and economic impact of treatment guidelines and patient and family education in the public mental health system of Texas, improves upon this methodology.
Feasibility study of new energy projects on three-level indicator system
NASA Astrophysics Data System (ADS)
Zhan, Zhigang
2018-06-01
With the rapid development of new energy industry, many new energy development projects are being carried out all over the world. To analyze the feasibility of the project. we build feasibility of new energy projects assessment model, based on the gathered abundant data about progress in new energy projects.12 indicators are selected by principal component analysis(PCA). Then we construct a new three-level indicator system, where the first level has 1 indicator, the second level has 5 indicators and the third level has 12 indicators to evaluate. Moreover, we use the entropy weight method (EWM) to get weight vector of the indicators in the third level and the multivariate statistical analysis(MVA)to get the weight vector of indicators in the second-class. We use this evaluation model to evaluate the feasibility of the new energy project and make a reference for the subsequent new energy investment. This could be a contribution to the world's low-carbon and green development by investing in sustainable new energy projects. We will introduce new variables and improve the weight model in the future. We also conduct a sensitivity analysis of the model and illustrate the strengths and weaknesses.
Feasibility of Using a Caribbean Strain of the New World Screwworm for SIT Campaigns in Brazil
USDA-ARS?s Scientific Manuscript database
The New World Screwworm (NWS) is one of the most damaging parasites of livestock in South America with annual losses of millions of dollars. Recently, Mercado Común del Sur countries demonstrated interest for the control of this pest by the Sterile Insect Technique (SIT). A pilot-project was conduct...
Feasibility of new simulation technology to train novice drivers
DOT National Transportation Integrated Search
1996-12-01
This project examined the feasibility of using existing simulation and other electronic device technology with the potential for the safety training of novice drivers. Project activities included: a literature review; site visits and telephone inquir...
7 CFR 4280.179 - Selecting feasibility study grant applications for award.
Code of Federal Regulations, 2013 CFR
2013-01-01
... GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280... certify that the purposes of the project can be met, and the Agency must determine the project is...
7 CFR 4280.179 - Selecting feasibility study grant applications for award.
Code of Federal Regulations, 2012 CFR
2012-01-01
... GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280... certify that the purposes of the project can be met, and the Agency must determine the project is...
NASA Technical Reports Server (NTRS)
Plachta, David W.; Tucker, Stephen; Hoffman, David J.
1993-01-01
This paper analyzes, defines, and sizes cryogenic storage thermal control systems that meet the requirements of future NASA Mars human exploration missions. The design issues of this system include the projection of the existing Multilayer Insulation data base for cryogenic storage to much thicker (10 cm or more) insulation systems, the unknown heat leak from mechanical interfaces, and the thermal and structural performance effects of the large tank sizes required for a Mars mission. Acknowledging these unknown effects, heat loss projections are made based on extrapolation of the existing data base. The results indicate that hydrogen, methane, and oxygen are feasible propellants, and that the best suited thermal control sytems are 'thick' MLI, thermodynamic vent sytems, cryocoolers, and vacuum jackets.
NASA Technical Reports Server (NTRS)
Willett, Mike
2015-01-01
Orbital Research, Inc., developed, built, and tested three high-temperature components for use in the design of a data concentrator module in distributed turbine engine control. The concentrator receives analog and digital signals related to turbine engine control and communicates with a full authority digital engine control (FADEC) or high-level command processor. This data concentrator follows the Distributed Engine Controls Working Group (DECWG) roadmap for turbine engine distributed controls communication development that operates at temperatures at least up to 225 C. In Phase I, Orbital Research developed detailed specifications for each component needed for the system and defined the total system specifications. This entailed a combination of system design, compiling existing component specifications, laboratory testing, and simulation. The results showed the feasibility of the data concentrator. Phase II of this project focused on three key objectives. The first objective was to update the data concentrator design modifications from DECWG and prime contractors. Secondly, the project defined requirements for the three new high-temperature, application-specific integrated circuits (ASICs): one-time programmable (OTP), transient voltage suppression (TVS), and 3.3V. Finally, the project validated each design by testing over temperature and under load.
Project Stride: An Equine-Assisted Intervention to Reduce Symptoms of Social Anxiety in Young Women.
Alfonso, Sarah V; Alfonso, Lauren A; Llabre, Maria M; Fernandez, M Isabel
2015-01-01
Although there is evidence supporting the use of equine-assisted activities to treat mental disorders, its efficacy in reducing signs and symptoms of social anxiety in young women has not been examined. We developed and pilot tested Project Stride, a brief, six-session intervention combining equine-assisted activities and cognitive-behavioral strategies to reduce symptoms of social anxiety. A total of 12 women, 18-29 years of age, were randomly assigned to Project Stride or a no-treatment control. Participants completed the Liebowitz Social Anxiety Scale at baseline, immediate-post, and 6 weeks after treatment. Project Stride was highly acceptable and feasible. Compared to control participants, those in Project Stride had significantly greater reductions in social anxiety scores from baseline to immediate-post [decrease of 24.8 points; t (9) = 3.40, P = .008)] and from baseline to follow-up [decrease of 31.8 points; t (9) = 4.12, P = .003)]. These findings support conducting a full-scale efficacy trial of Project Stride. Copyright © 2015 Elsevier Inc. All rights reserved.
Solar Thermal Power Systems parabolic dish project
NASA Technical Reports Server (NTRS)
Truscello, V. C.
1981-01-01
The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.
Determine feasible and acceptable age 21 support programs
DOT National Transportation Integrated Search
1990-09-01
The objective of this project was to identify programs which are feasible, acceptable, and effective in deterring adolescent drinking. To begin the project, information was collected on 22 prevention programs using a wide range of approaches. Next, a...
Acousto-optic laser projection systems for displaying TV information
NASA Astrophysics Data System (ADS)
Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.
2015-04-01
This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.
The Worksite Heart Health Improvement Project (WHHIP): feasibility and efficacy.
Flannery, Kelly; Resnick, Barbara; Galik, Elizabeth; Lipscomb, Jane; McPhaul, Kathleen; Shaughnessy, Marianne
2012-01-01
Test the feasibility and efficacy of the Worksite Heart Health Improvement Project (WHHIP). The WHHIP was a quasi-experimental 6-month pilot performed in 2 long-term care facilities. Thirty-nine female minority nursing assistants participated in this study with a mean age of 42.39 (SD = 12.79) years. Measures were collected at baseline, 3, and 6 months and included blood pressure, lipid panel, body mass index, physical activity levels, diet behaviors, depressive symptoms, and self-efficacy outcomes. The 3-month WHHIP intervention included 3 components: environmental and policy assessment; education; and on-going motivation. The control site received education only. Subject participation averaged 47% and 58% in exercise and diet related activities, respectively. Generalized estimating equations showed the treatment group showed significant improvements in depressive symptoms (p = .012), systolic blood pressure (p = .028), total cholesterol (p = .002) and triglycerides (p = .011) over time. The treatment group also showed trends for improvement in diet behaviors (p = .069) and diastolic blood pressure (p = .073). This study provided feasibility evidence for the WHHIP and preliminary evidence that the WHHIP can improve heart healthy behaviors and subsequent outcomes among nursing assistants in long-term care settings. © 2012 Wiley Periodicals, Inc.
The Development and Flight Testing of an Aerially Deployed Unmanned Aerial System
NASA Astrophysics Data System (ADS)
Smith, Andrew
An investigation into the feasibility of aerial deployed unmanned aerial vehicles was completed. The investigation included the development and flight testing of multiple unmanned aerial systems to investigate the different components of potential aerial deployment missions. The project consisted of two main objectives; the first objective dealt with the development of an airframe capable of surviving aerial deployment from a rocket and then self assembling from its stowed configuration into its flight configuration. The second objective focused on the development of an autopilot capable of performing basic guidance, navigation, and control following aerial deployment. To accomplish these two objectives multiple airframes were developed to verify their completion experimentally. The first portion of the project, investigating the feasibility of surviving an aerial deployment, was completed using a fixed wing glider that following a successful deployment had 52 seconds of controlled flight. Before developing the autopilot in the second phase of the project, the glider was significantly upgraded to fix faults discovered in the glider flight testing and to enhance the system capabilities. Unfortunately to conform to outdoor flight restrictions imposed by the university and the Federal Aviation Administration it was required to switch airframes before flight testing of the new fixed wing platform could begin. As a result, an autopilot was developed for a quadrotor and verified experimentally completely indoors to remain within the limits of governing policies.
Resonance: The science behind the art of sonic drilling
NASA Astrophysics Data System (ADS)
Lucon, Peter Andrew
The research presented in this dissertation quantifies the system dynamics and the influence of control variables of a sonic drill system. The investigation began with an initial body of work funded by the Department of Energy under a Small Business Innovative Research Phase I Grant, grant number: DE-FG02-06ER84618, to investigate the feasibility of using sonic drills to drill micro well holes to depths of 1500 feet. The Department of Energy funding enabled feasibility testing using a 750 hp sonic drill owned by Jeffery Barrow, owner of Water Development Co. During the initial feasibility testing, data was measured and recorded at the sonic drill head while the sonic drill penetrated to a depth of 120 feet. To demonstrate feasibility, the system had to be well understood to show that testing of a larger sonic drill could simulate the results of drilling a micro well hole of 2.5 inch diameter. A first-order model of the system was developed that produced counter-intuitive findings that enabled the feasibility of using this method to drill deeper and produce micro-well holes to 1500 feet using sonic drills. Although funding was not continued, the project work continued. This continued work expanded on the sonic drill models by understanding the governing differential equation and solving the boundary value problem, finite difference methods, and finite element methods to determine the significance of the control variables that can affect the sonic drill. Using a design of experiment approach and commercially available software, the significance of the variables to the effectiveness of the drill system were determined. From the significant variables, as well as the real world testing, a control system schematic for a sonic drill was derived and is patent pending. The control system includes sensors, actuators, personal logic controllers, as well as a human machine interface. It was determined that the control system should control the resonant mode and the weight on the bit as the primary two control variables. The sonic drill can also be controlled using feedback from sensors mounted on the sonic drill head, which is the driver for the sonic drill located above ground
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hallstrom, Jason O.; Ni, Zheng Richard
This STTR Phase I project assessed the feasibility of a new CO 2 sensing system optimized for low-cost, high-accuracy, whole-building monitoring for use in demand control ventilation. The focus was on the development of a wireless networking platform and associated firmware to provide signal conditioning and conversion, fault- and disruptiontolerant networking, and multi-hop routing at building scales to avoid wiring costs. Early exploration of a bridge (or “gateway”) to direct digital control services was also explored. Results of the project contributed to an improved understanding of a new electrochemical sensor for monitoring indoor CO 2 concentrations, as well as themore » electronics and networking infrastructure required to deploy those sensors at building scales. New knowledge was acquired concerning the sensor’s accuracy, environmental response, and failure modes, and the acquisition electronics required to achieve accuracy over a wide range of CO 2 concentrations. The project demonstrated that the new sensor offers repeatable correspondence with commercial optical sensors, with supporting electronics that offer gain accuracy within 0.5%, and acquisition accuracy within 1.5% across three orders of magnitude variation in generated current. Considering production, installation, and maintenance costs, the technology presents a foundation for achieving whole-building CO 2 sensing at a price point below $0.066 / sq-ft – meeting economic feasibility criteria established by the Department of Energy. The technology developed under this award addresses obstacles on the critical path to enabling whole-building CO 2 sensing and demand control ventilation in commercial retrofits, small commercial buildings, residential complexes, and other highpotential structures that have been slow to adopt these technologies. It presents an opportunity to significantly reduce energy use throughout the United States.« less
ERIC Educational Resources Information Center
Love, John M.; And Others
This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study... appraisal investigation or feasibility study under this program? Title to any rural water project planned...
ERIC Educational Resources Information Center
Helbock, Richard W.; Marker, Gordon
This study concerns the feasibility of a Markov chain model for projecting housing values and racial mixes. Such projections could be used in planning the layout of school districts to achieve desired levels of socioeconomic heterogeneity. Based upon the concepts and assumptions underlying a Markov chain model, it is concluded that such a model is…
Insect-Based Vision for Autonomous Vehicles: A Feasibility Study
NASA Technical Reports Server (NTRS)
Srinivasan, Mandyam V.
1999-01-01
The aims of the project were to use a high-speed digital video camera to pursue two questions: i) To explore the influence of temporal imaging constraints on the performance of vision systems for autonomous mobile robots; To study the fine structure of insect flight trajectories with in order to better understand the characteristics of flight control, orientation and navigation.
Insect-Based Vision for Autonomous Vehicles: A Feasibility Study
NASA Technical Reports Server (NTRS)
Srinivasan, Mandyam V.
1999-01-01
The aims of the project were to use a high-speed digital video camera to pursue two questions: (1) To explore the influence of temporal imaging constraints on the performance of vision systems for autonomous mobile robots; (2) To study the fine structure of insect flight trajectories in order to better understand the characteristics of flight control, orientation and navigation.
1989-01-01
force) per square inch to kilopascals, multiply by 6.894757. ** Flue - gas desulfurization . 27 1.0 sediment process, UCS measurements for solidified...Dredging Control Technoloqies 11 Evaluation of Conceptual Dredging and Disposal Alternatives 12 Executive Summary Destroy this report when no longer needed...solubility of metals by controlling the pH and alkalinity. Additional metal immobilization can be obtained by modify- ing the process to include
Feasibility Study for Battle Mountain Renewable Energy Park
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, Donna
The Feasibility Study for the Battle Mountain Renewable Energy Park project (“Feasibility Study”) will assess the feasibility, benefits and impacts of a 5 Mega Watt (MW) solar photovoltaic (PV) generating system (the “Solar Project” or “Energy Park”) on the Te-Moak Tribe of Western Shoshone Indians of Nevada Battle Mountain Colony in Battle Mountain, Nevada (NV). The Energy Park will provide power for export to utility off-takers and job training and employment for Tribal members and revenue for the Tribe. This Feasibility Study will be a collaborative effort between the Tribal government, consultants, Tribal members and stakeholders and will allow themore » Tribe to make informed decisions regarding the Solar Project.« less
A Web-Based Monitoring System for Multidisciplinary Design Projects
NASA Technical Reports Server (NTRS)
Rogers, James L.; Salas, Andrea O.; Weston, Robert P.
1998-01-01
In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.
1989-12-01
project nor affect significantly the projects econmic efficiency. These effects are described in the Feasibility Report, EIS/EIR and suportin...modifications beca necesary. To insure the econmic efficiency of the project using the accelerated rise rate in NRc Case III, the Regional Project was...is a str econmic candidate. 23 Table 14 RICtOALL P3ECr ECONaMEC FEABILIY WI H SEA LEVEL RISE (1988 Price Level) Oticon 3 Historical NRC Project
7 CFR 4280.21 - Eligible REDG Ultimate Recipients and Projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... eligible entities to provide medical training and related professional health care skills to rural health... facilitate medical or educational services or job training; or (6) Project feasibility studies and Technical Assistance. A qualified Independent Provider must perform feasibility studies or Technical Assistance. (b...
Fluorescence guided lymph node biopsy in large animals using direct image projection device
NASA Astrophysics Data System (ADS)
Ringhausen, Elizabeth; Wang, Tylon; Pitts, Jonathan; Akers, Walter J.
2016-03-01
The use of fluorescence imaging for aiding oncologic surgery is a fast growing field in biomedical imaging, revolutionizing open and minimally invasive surgery practices. We have designed, constructed, and tested a system for fluorescence image acquisition and direct display on the surgical field for fluorescence guided surgery. The system uses a near-infrared sensitive CMOS camera for image acquisition, a near-infra LED light source for excitation, and DLP digital projector for projection of fluorescence image data onto the operating field in real time. Instrument control was implemented in Matlab for image capture, processing of acquired data and alignment of image parameters with the projected pattern. Accuracy of alignment was evaluated statistically to demonstrate sensitivity to small objects and alignment throughout the imaging field. After verification of accurate alignment, feasibility for clinical application was demonstrated in large animal models of sentinel lymph node biopsy. Indocyanine green was injected subcutaneously in Yorkshire pigs at various locations to model sentinel lymph node biopsy in gynecologic cancers, head and neck cancer, and melanoma. Fluorescence was detected by the camera system during operations and projected onto the imaging field, accurately identifying tissues containing the fluorescent tracer at up to 15 frames per second. Fluorescence information was projected as binary green regions after thresholding and denoising raw intensity data. Promising results with this initial clinical scale prototype provided encouraging results for the feasibility of optical projection of acquired luminescence during open oncologic surgeries.
Acousto-optic laser projection systems for displaying TV information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M
2015-04-30
This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulatorsmore » and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)« less
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2014 CFR
2014-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2013 CFR
2013-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2012 CFR
2012-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burpo, Rob
2012-02-29
To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viabilitymore » of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.« less
A New Continuous-Time Equality-Constrained Optimization to Avoid Singularity.
Quan, Quan; Cai, Kai-Yuan
2016-02-01
In equality-constrained optimization, a standard regularity assumption is often associated with feasible point methods, namely, that the gradients of constraints are linearly independent. In practice, the regularity assumption may be violated. In order to avoid such a singularity, a new projection matrix is proposed based on which a feasible point method to continuous-time, equality-constrained optimization is developed. First, the equality constraint is transformed into a continuous-time dynamical system with solutions that always satisfy the equality constraint. Second, a new projection matrix without singularity is proposed to realize the transformation. An update (or say a controller) is subsequently designed to decrease the objective function along the solutions of the transformed continuous-time dynamical system. The invariance principle is then applied to analyze the behavior of the solution. Furthermore, the proposed method is modified to address cases in which solutions do not satisfy the equality constraint. Finally, the proposed optimization approach is applied to three examples to demonstrate its effectiveness.
Hawk, Mary
2013-12-01
African American women in the United States experience significant HIV health disparities. The majority of evidence-based risk reduction interventions do not incorporate HIV testing, and most are targeted only to narrow segments of the population such as women who are pregnant or seen in STI clinics. This pilot study assessed the feasibility and efficacy of The Girlfriends Project (TGP), a community developed and community evaluated HIV risk reduction and testing intervention. A group randomized wait-list design was used to recruit 149 women and to compare findings for intervention group versus control group participants. Women in the intervention group demonstrated statistically-significant increases in HIV knowledge scores and in condom use during vaginal sex. Eighty-seven percent of participants accessed HIV testing with a 100% return rate for results. Study findings suggest that TGP has the potential to be an effective intervention and to increase number of African American women who access HIV testing.
Ecological Feasibility Studies in Restoration Decision Making
NASA Astrophysics Data System (ADS)
Hopfensperger, Kristine N.; Engelhardt, Katharina A. M.; Seagle, Steven W.
2007-06-01
The restoration of degraded systems is essential for maintaining the provision of valuable ecosystem services, including the maintenance of aesthetic values. However, restoration projects often fail to reach desired goals for a variety of ecologic, financial, and social reasons. Feasibility studies that evaluate whether a restoration effort should even be attempted can enhance restoration success by highlighting potential pitfalls and gaps in knowledge before the design phase of a restoration. Feasibility studies also can bring stakeholders together before a restoration project is designed to discuss potential disagreements. For these reasons, a feasibility study was conducted to evaluate the efficacy of restoring a tidal freshwater marsh in the Potomac River near Alexandria, Virginia. The study focused on science rather than engineering questions, and thus differed in approach from other feasibility studies that are mostly engineering driven. The authors report the framework they used to conduct a feasibility study to inform other potential restoration projects with similar goals. The seven steps of the framework encompass (1) initiation of a feasibility study, (2) compilation of existing data, (3) collection of current site information, (4) examination of case studies, (5) synthesis of information in a handbook, (6) meeting with selected stakeholders, and (7) evaluation of meeting outcomes. By conducting a feasibility study using the seven-step framework, the authors set the stage for conducting future compliance studies and enhancing the chance of a successful restoration.
Economics of cutting wood parts with a laser under optical image analyzer control
Henry E. Huber; Charles W. McMillin; Arthur Rasher
1982-01-01
A financial analysis using discounted cash-flow techniques was used to determine the economic feasibility of a new laser lumber processing system for use in a furniture rough mill. The projected cost of the system was $790,000 which would replace conventional crosscut and ripsaws costing $256,856. A financial analysis was made assuming only a 5 percent yield increase...
1988-11-01
position and pulled through the sediment. Different opening configurations can be used to suit the sediment being removed (Figure 8). 42. The AMTEC ...associated with the New Bedford Harbor site and the relatively large minimum working depth of the AMTEC pneumatic system, this type of dredging
Synthesis and Control of Flexible Systems with Component-Level Uncertainties
NASA Technical Reports Server (NTRS)
Maghami, Peiman G.; Lim, Kyong B.
2009-01-01
An efficient and computationally robust method for synthesis of component dynamics is developed. The method defines the interface forces/moments as feasible vectors in transformed coordinates to ensure that connectivity requirements of the combined structure are met. The synthesized system is then defined in a transformed set of feasible coordinates. The simplicity of form is exploited to effectively deal with modeling parametric and non-parametric uncertainties at the substructure level. Uncertainty models of reasonable size and complexity are synthesized for the combined structure from those in the substructure models. In particular, we address frequency and damping uncertainties at the component level. The approach first considers the robustness of synthesized flexible systems. It is then extended to deal with non-synthesized dynamic models with component-level uncertainties by projecting uncertainties to the system level. A numerical example is given to demonstrate the feasibility of the proposed approach.
Duffy, Sophia; Brown, Tasha M; Katsonga-Phiri, Tiamo; Bouris, Alida; Grant, Kathryn E; Keenan, Kate
2016-05-01
We describe the development, feasibility, and acceptability of a novel preventive intervention for depression in African American girls living in urban poverty. Our approach targeted individual and interpersonal vulnerabilities that have been shown to confer risk for depression in samples of African American girls living in low-income, urban settings, including suppression of negative emotion and lack of assertiveness with peers, memory for positive emotion, active coping, and family connection. Focus groups and an open trial were conducted to refine the goals and mechanisms for skill building. A randomized controlled trial (RCT) of the new program (Cities Mother-Daughter Project) was conducted with 3rd-5th grade students from Chicago Public Schools (CPS). Three cycles of screening, randomization, and deployment were conducted to assess feasibility, satisfaction, and usability. Results indicate that feasibility was weak; whereas, satisfaction and usability were high. Future directions for testing efficacy are discussed.
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
Active Treatment for Idiopathic Adolescent Scoliosis (ACTIvATeS): a feasibility study.
Williams, Mark A; Heine, Peter J; Williamson, Esther M; Toye, Francine; Dritsaki, Melina; Petrou, Stavros; Crossman, Richard; Lall, Ranjit; Barker, Karen L; Fairbank, Jeremy; Harding, Ian; Gardner, Adrian; Slowther, Anne-Marie; Coulson, Neil; Lamb, Sarah E
2015-07-01
The feasibility of conducting a definitive randomised controlled trial (RCT) evaluating the clinical effectiveness and cost-effectiveness of scoliosis-specific exercises (SSEs) for adolescent idiopathic scoliosis (AIS) is uncertain. The aim of this study was to assess the feasibility of conducting a large, multicentre trial of SSE treatment for patients with AIS, in comparison with standard care, and to refine elements of the study design. The objectives were to (1) update a systematic review of controlled trials evaluating the efficacy of SSE in AIS; (2) survey UK orthopaedic surgeons and physiotherapists to determine current practice, patient populations and equipoise; (3) randomise 50 adolescents to a feasibility trial of either usual care or SSE interventions across a range of sites; (4) develop, document and assess acceptability and adherence of interventions; (5) assess and describe training requirements of physiotherapists; and (6) gain user input in all relevant stages of treatment and protocol design. Multicomponent feasibility study including UK clinician survey, systematic literature review and a randomised feasibility trial. The randomised feasibility study involved four secondary care NHS trusts providing specialist care for patients with AIS. The randomised feasibility study recruited people aged 10-16 years with mild AIS (Cobb angle of < 50°). The randomised study allocated participants to standard practice of advice and education or a physiotherapy SSE programme supported by a home exercise plan. Our choice of intervention was informed by a systematic review of exercise interventions for AIS. The main outcome was feasibility of recruitment to the randomised study. Other elements were to inform choice of outcomes for a definitive trial and included curve severity, quality of life, requirement for surgery/brace, adverse events, psychological symptoms, costs and health utilities. A UK survey of orthopaedic consultants and physiotherapists indicated a wide variation in current provision of exercise therapy through physiotherapy services. It also found that clinicians from at least 15 centres would be willing to have their patients involved in a full study. A systematic review update found five new studies that were generally of low quality but showed some promise of effectiveness of SSE. The randomised study recruited 58 patients from four NHS trusts over 11 months and exceeded the pre-specified target recruitment rate of 1.4 participants per centre per month, with acceptable 6-month follow-up (currently 73%). Adherence to treatment was variable (56% of participants completed treatment offered). The qualitative study found the exercise programme to be highly acceptable. We learnt important lessons from patient and public involvement during the study in terms of study and intervention presentation, as well as practical elements such as scheduling of intervention sessions. A definitive RCT evaluating clinical effectiveness and cost-effectiveness of SSE for idiopathic scoliosis is warranted and feasible. Such a RCT is a priority for future work in the area. There is a sufficiently large patient base, combined with willingness to be randomised within specialist UK centres. Interventions developed during the feasibility study were acceptable to patients, families and physiotherapists and can be given within the affordability envelope of current levels of physiotherapy commissioning. Current Controlled Trials ISRCTN90480705. This project was funded by the NIHR Health Technology Assessment programme and will be published in full in Health Technology Assessment; Vol. 19, No. 55. See the NIHR Journals Library website for further project information.
NASA Astrophysics Data System (ADS)
Tamura, Sho; Maeyama, Shoichi
Rescue robots have been actively developed since Hanshin-Awaji (Kobe) Earthquake. Recently, the rescue robot to reduce the risk of the secondary disaster on NBC terror and critical accident is also developed. For such a background, the development project of mobile RT system in the collapsed is started. This research also participates in this project. It is useful to use the image pointing for the control interface of the rescue robot because it can control the robot by the simple operation. However, the conventional method cannot work on a rough terrain. In this research, we propose the system which controls the robot to arrive the target position on the rough terrain. It is constructed the methods which put the destination into the vector, and control the 3D localizated robot to follow the vector. Finally, the proposed system is evaluated through experiments by remote control of a mobile robot in slope and cofirmed the feasibility.
Reza-Paul, Sushena; Lazarus, Lisa; Doshi, Monika; Hafeez Ur Rahman, Syed; Ramaiah, Manjula; Maiya, Raviprakash; Ms, Venugopal; Venukumar, K T; Sundararaman, Sundar; Becker, Marissa; Moses, Stephen; Lorway, Robert
2016-01-01
HIV prevalence among female sex workers (FSWs) in India remains well above the national average. Pre-exposure prophylaxis (PrEP), a new HIV prevention technology, may help to reduce HIV incidence, but there is a dearth of research that can inform the potential scale-up of PrEP in India. In partnership with Ashodaya Samithi, a local sex worker collective, we conducted a feasibility study to assess acceptance of a planned PrEP demonstration project, willingness to use PrEP, and recommendations for project roll-out among FSWs in southern Karnataka. From January-April 2015, 6 focus group discussions, 47 in-depth interviews, and 427 interviewer-administered questionnaires were completed by female sex workers. All participants were 18 years of age or older and practiced sex work. Qualitative data were coded for key themes and emergent categories. Univariate descriptive analysis was employed to summarise the quantitative data. Qualitative. PrEP was described as an exciting new prevention technology that places control in the hands of FSWs and provides a "double safety" in combination with condom use. Participants expressed agreement that women who may experience more HIV risk in their occupational environments should be prioritized for enrollment into a demonstration project. Quantitative. 406 participants (95%) expressed interest in PrEP. Participants prioritized the inclusion of FSWs under the age of 25 (79%), those who do not use condoms when clients offer more money (58%), who do not consistently use condoms with regular partners (57%), who drink alcohol regularly (49%), and who do not use condoms consistently with clients (48%). This feasibility study indicated strong interest in PrEP and a desire to move forward with the demonstration project. Participants expressed their responses in terms of public health discourses surrounding risk, pointing to the importance of situating PrEP scale up within the trusted spaces of community-based organizations as a means of supporting PrEP uptake and adherence.
Advanced Low Temperature Geothermal Power Cycles (The ENTIV Organic Project) Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mugerwa, Michael
2015-11-18
Feasibility study of advanced low temperature thermal power cycles for the Entiv Organic Project. Study evaluates amonia-water mixed working fluid energy conversion processes developed and licensed under Kalex in comparison with Kalina cycles. Both cycles are developed using low temperature thermal resource from the Lower Klamath Lake Geothermal Area. An economic feasibility evaluation was conducted for a pilot plant which was deemed unfeasible by the Project Sponsor (Entiv).
A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects
NASA Technical Reports Server (NTRS)
Salas, Andrea O.; Rogers, James L.
1997-01-01
In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.
Herrman, Helen; Humphreys, Cathy; Halperin, Stephen; Monson, Katherine; Harvey, Carol; Mihalopoulos, Cathrine; Cotton, Susan; Mitchell, Penelope; Glynn, Tony; Magnus, Anne; Murray, Lenice; Szwarc, Josef; Davis, Elise; Havighurst, Sophie; McGorry, Patrick; Tyano, Sam; Kaplan, Ida; Rice, Simon; Moeller-Saxone, Kristen
2016-12-07
Out-of-home care (OoHC) refers to young people removed from their families by the state because of abuse, neglect or other adversities. Many of the young people experience poor mental health and social function before, during and after leaving care. Rigorously evaluated interventions are urgently required. This publication describes the protocol for the Ripple project and notes early findings from a controlled trial demonstrating the feasibility of the work. The Ripple project is implementing and evaluating a complex mental health intervention that aims to strengthen the therapeutic capacities of carers and case managers of young people (12-17 years) in OoHC. The study is conducted in partnership with mental health, substance abuse and social services in Melbourne, with young people as participants. It has three parts: 1. Needs assessment and implementation of a complex mental health intervention; 2. A 3-year controlled trial of the mental health, social and economic outcomes; and 3. Nested process evaluation of the intervention. Early findings characterising the young people, their carers and case managers and implementing the intervention are available. The trial Wave 1 includes interviews with 176 young people, 52% of those eligible in the study population, 104 carers and 79 case managers. Implementing and researching an affordable service system intervention appears feasible and likely to be applicable in other places and countries. Success of the intervention will potentially contribute to reducing mental ill-health among these young people, including suicide attempts, self-harm and substance abuse, as well as reducing homelessness, social isolation and contact with the criminal justice system. Australian New Zealand Clinical Trials Registry ACTRN12615000501549 . Retrospectively registered 19 May 2015.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less
Device Oriented Project Controller
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dalesio, Leo; Kraimer, Martin
2013-11-20
This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions havemore » been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.« less
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...
NASA Technical Reports Server (NTRS)
Miller, R. E., Jr.; Hansen, S. D.; Redhed, D. D.; Southall, J. W.; Kawaguchi, A. S.
1974-01-01
Evaluation of the cost-effectiveness of integrated analysis/design systems with particular attention to Integrated Program for Aerospace-Vehicle Design (IPAD) project. An analysis of all the ingredients of IPAD indicates the feasibility of a significant cost and flowtime reduction in the product design process involved. It is also concluded that an IPAD-supported design process will provide a framework for configuration control, whereby the engineering costs for design, analysis and testing can be controlled during the air vehicle development cycle.
MSFC Sortie Laboratory Environmental Control System (ECS) phase B design study results
NASA Technical Reports Server (NTRS)
Ignatonis, A. J.; Mitchell, K. L.
1974-01-01
Phase B effort of the Sortie Lab program has concluded. Results of that effort are presented which pertain to the definitions of the environmental control system (ECS). Numerous design studies were performed in Phase B to investigate system feasibility, complexity, weight, and cost. The results and methods employed for these design studies are included. An autonomous Sortie Lab ECS was developed which utilizes a deployed space radiator. Total system weight was projected to be 1814.4 kg including the radiator and fluids. ECS power requirements were estimated at 950 watts.
Controlled Aeroelastic Response and Airfoil Shaping Using Adaptive Materials and Integrated Systems
NASA Technical Reports Server (NTRS)
Pinkerton, Jennifer L.; McGowan, Anna-Maria R.; Moses, Robert W.; Scott, Robert C.; Heeg, Jennifer
1996-01-01
This paper presents an overview of several activities of the Aeroelasticity Branch at the NASA Langley Research Center in the area of applying adaptive materials and integrated systems for controlling both aircraft aeroelastic response and airfoil shape. The experimental results of four programs are discussed: the Piezoelectric Aeroelastic Response Tailoring Investigation (PARTI); the Adaptive Neural Control of Aeroelastic Response (ANCAR) program; the Actively Controlled Response of Buffet Affected Tails (ACROBAT) program; and the Airfoil THUNDER Testing to Ascertain Characteristics (ATTACH) project. The PARTI program demonstrated active flutter control and significant rcductions in aeroelastic response at dynamic pressures below flutter using piezoelectric actuators. The ANCAR program seeks to demonstrate the effectiveness of using neural networks to schedule flutter suppression control laws. Th,e ACROBAT program studied the effectiveness of a number of candidate actuators, including a rudder and piezoelectric actuators, to alleviate vertical tail buffeting. In the ATTACH project, the feasibility of using Thin-Layer Composite-Uimorph Piezoelectric Driver and Sensor (THUNDER) wafers to control airfoil aerodynamic characteristics was investigated. Plans for future applications are also discussed.
BIOMASS REBURNING - MODELING/ENGINEERING STUDIES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vladimir Zamansky; Chris Lindsey
This project is designed to develop engineering and modeling tools for a family of NO{sub x}control technologies utilizing biomass as a reburning fuel. During the eighth reporting period (July 1--September 26, 1999), Antares Group Inc, under contract to Niagara Mohawk Power Corporation, evaluated the economic feasibility of biomass reburning options for Dunkirk Station. This report includes summary of the findings; complete information will be submitted in the next Quarterly Report.
A Summary of the Naval Postgraduate School Research Program.
1982-05-01
and testing of PCM modu- lation formats, design and test of an underwater video line using a diver’s handheld camera and bi-directional interconnection...to design and develop advanced control schemes which successfully optimize the tor- pedo steering performance for Project Courageous. cummary: Work...investigating the feasibility and design of fiber optic communications in underwater torpedo ranges. Summary: An underwater fiber optic video uplink was
Zhang, Jing; Sun, Lei; Liu, Yu; Wang, Hongyi; Sun, Ningling; Zhang, Puhong
2017-03-08
Electronic data capture (EDC) systems have been widely used in clinical research, but mobile device-based electronic data capture (mEDC) system has not been well evaluated. The aim of our study was to evaluate the feasibility, advantages, and challenges of mEDC in data collection, project management, and telemonitoring in a randomized controlled trial (RCT). We developed an mEDC to support an RCT called "Telmisartan and Hydrochlorothiazide Antihypertensive Treatment (THAT)" study, which was a multicenter, double-blinded, RCT, with the purpose of comparing the efficacy of telmisartan and hydrochlorothiazide (HCTZ) monotherapy in high-sodium-intake patients with mild to moderate hypertension during a 60 days follow-up. Semistructured interviews were conducted during and after the trial to evaluate the feasibility, advantage, and challenge of mEDC. Nvivo version 9.0 (QSR International) was used to analyze records of interviews, and a thematic framework method was used to obtain outcomes. The mEDC was successfully used to support the data collection and project management in all the 14 study hospitals. A total of 1333 patients were recruited with support of mEDC, of whom 1037 successfully completed all 4 visits. Across all visits, the average time needed for 141 questions per patient was 53 min, which were acceptable to both doctors and patients. All the interviewees, including 24 doctors, 53 patients, 1 clinical research associate (CRA), 1 project manager (PM), and 1 data manager (DM), expressed their satisfaction to nearly all the functions of the innovative mEDC in randomization, data collection, project management, quality control, and remote monitoring in real time. The average satisfaction score was 9.2 (scale, 0-10). The biggest challenge came from the stability of the mobile or Wi-Fi signal although it was not a problem in THAT study. The innovative mEDC has many merits and is well acceptable in supporting data collection and project management in a timely manner in clinical trial. ©Jing Zhang, Lei Sun, Yu Liu, Hongyi Wang, Ningling Sun, Puhong Zhang. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 08.03.2017.
Molinos-Senante, M; Hernández-Sancho, F; Sala-Garrido, R
2011-12-01
Water reuse is an emerging and promising non-conventional water resource. Feasibility studies are essential tools in the decision making process for the implementation of water-reuse projects. However, the methods used to assess economic feasibility tend to focus on internal costs, while external impacts are relegated to unsubstantiated statements about the advantages of water reuse. Using the concept of shadow prices for undesirable outputs of water reclamation, the current study developed a theoretical methodology to assess internal and external economic impacts. The proposed methodological approach is applied to 13 wastewater treatment plants in the Valencia region of Spain that reuse effluent for environmental purposes. Internal benefit analyses indicated that only a proportion of projects were economically viable, while when external benefits are incorporated all projects were economically viable. In conclusion, the economic feasibility assessments of water-reuse projects should quantitatively evaluate economic, environmental and resource availability. Copyright © 2011 Elsevier Ltd. All rights reserved.
Lightning control system using high power microwave FEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shiho, M.; Watanbe, A.; Kawasaki, S.
A research project for developing a thunder lightning control system using an induction linac based high power microwave free electron laser (FEL) started at JAERI The system will produce weakly ionized plasma rod in the atmosphere by high power microwaves and control a lightning path, away from , e. g., nuclear power stations and rocket launchers. It has been known that about MW/cm{sup 2} power density is enough for the atmospheric breakdown in the microwave region, and which means high power microwave FEL with GW level output power is feasible for atmospheric breakdown, and accordingly is feasible for thunder lightningmore » control tool with making a conductive plasma channel in the atmosphere. From the microwave attenuation consideration in the atmosphere, FEL of 35GHz(0.13dB/km), 90GHz(0.35dB/km), 140GHz(1.7dB/km), and of 270 GHz(4.5dB/km) are the best candidates for the system. Comparing with other proposed lightning control system using visible or ultraviolet laser, the system using microwave has an advantage that microwave suffers smaller attenuation by rain or snow which always exist in the real atmospheric circumstances when lightning occurs.« less
Wind-To-Hydrogen Energy Pilot Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ron Rebenitsch; Randall Bush; Allen Boushee
2009-04-24
WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energymore » development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.« less
NASA Technical Reports Server (NTRS)
Gerren, Donna S.
1993-01-01
A review of accidents that involved the loss of hydraulic flight control systems serves as an introduction to this project. In each of the accidents--involving transport aircraft such as the DC-10, the C-5A, the L-1011, and the Boeing 747--the flight crew attempted to control the aircraft by means of thrust control. Although these incidents had tragic endings, in the absence of control power due to primary control system failure, control power generated by selective application of engine thrust has proven to be a viable alternative. NASA Dryden has demonstrated the feasibility of controlling an aircraft during level flight, approach, and landing conditions using an augmented throttles-only control system. This system has been successfully flown in the flight test simulator for the B-720 passenger transport and the F-15 air superiority fighter and in actual flight tests for the F-15 aircraft. The Douglas Aircraft Company is developing a similar system for the MD-11 aircraft. The project's ultimate goal is to provide data for the development of thrust control systems for mega-transports (600+ passengers).
ERIC Educational Resources Information Center
Christensen, Julie J.; Humiston, Sharon G.; Long, Christine E.; Kennedy, Allison M.; DiMattia, Kimberly; Kolasa, Maureen S.
2012-01-01
This study qualitatively assesses the acceptability and feasibility of a school-located vaccination for influenza (SLIV) project that was conducted in New York State in 2009-2011, from the perspectives of project participants with different roles. Fourteen in-depth semistructured interviews with participating schools' personnel and the mass…
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
Eastern Rensselaer County Community Warehouse. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
The Eastern Rensselaer County Community Warehouse (ERCCW) project was conducted to determine if reuse is a feasible waste-management technology. The project had three phases: determining the feasibility of economically collecting, warehousing, refurbishing, and selling salvageable items from transfer stations, individuals, and businesses located in a rural area; preparing an operational plan; implementing the plan. Project findings suggest that, with proper management, a warehouse for waste reuse is feasible and can be self-sustaining. It also found that reuse results in the short-term saving of landfill capacity, and can provide low-cost goods to residents of rural areas. The study concludes that reuse,more » through retailing, is a viable waste-management practice. The report has been prepared as a how-to guide for municipalities, organizations, and individuals interested in reducing landfill waste and in establishing a reuse/recycling facility. Questions to consider, resources, and an overview of the ERCCW project are provided.« less
Generalized Projective Synchronization between Two Complex Networks with Time-Varying Coupling Delay
NASA Astrophysics Data System (ADS)
Sun, Mei; Zeng, Chang-Yan; Tian, Li-Xin
2009-01-01
Generalized projective synchronization (GPS) between two complex networks with time-varying coupling delay is investigated. Based on the Lyapunov stability theory, a nonlinear controller and adaptive updated laws are designed. Feasibility of the proposed scheme is proven in theory. Moreover, two numerical examples are presented, using the energy resource system and Lü's system [Physica A 382 (2007) 672] as the nodes of the networks. GPS between two energy resource complex networks with time-varying coupling delay is achieved. This study can widen the application range of the generalized synchronization methods and will be instructive for the demand-supply of energy resource in some regions of China.
Flood, David; Douglas, Kate; Goldberg, Vera; Martinez, Boris; Garcia, Pablo; Arbour, MaryCatherine; Rohloff, Peter
2017-08-01
Quality improvement (QI) is a key strategy for improving diabetes care in low- and middle-income countries (LMICs). This study reports on a diabetes QI project in rural Guatemala whose primary aim was to improve glycemic control of a panel of adult diabetes patients. Formative research suggested multiple areas for programmatic improvement in ambulatory diabetes care. This project utilized the Model for Improvement and Agile Global Health, our organization's complementary healthcare implementation framework. A bundle of improvement activities were implemented at the home, clinic and institutional level. Control charts of mean hemoglobin A1C (HbA1C) and proportion of patients meeting target HbA1C showed improvement as special cause variation was identified 3 months after the intervention began. Control charts for secondary process measures offered insights into the value of different components of the intervention. Intensity of home-based diabetes education emerged as an important driver of panel glycemic control. Diabetes QI work is feasible in resource-limited settings in LMICs and can improve glycemic control. Statistical process control charts are a promising methodology for use with panels or registries of diabetes patients. © The Author 2017. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com
Jones, Michael L.; Brenden, Travis O.; Irwin, Brian J.
2015-01-01
The St. Marys River (SMR) historically has been a major producer of sea lampreys (Petromyzon marinus) in the Laurentian Great Lakes. In the early 2000s, a decision analysis (DA) project was conducted to evaluate sea lamprey control policies for the SMR; this project suggested that an integrated policy of trapping, sterile male releases, and Bayluscide treatment was the most cost-effective policy. Further, it concluded that formal assessment of larval sea lamprey abundance and distribution in the SMR would be valuable for future evaluation of control strategies. We updated this earlier analysis, adding information from annual larval assessments conducted since 1999 and evaluating additional control policies. Bayluscide treatments continued to be critical for sea lamprey control, but high recruitment compensation minimized the effectiveness of trapping and sterile male release under current feasible ranges. Because Bayluscide control is costly, development of strategies to enhance trapping success remains a priority. This study illustrates benefits of an adaptive management cycle, wherein models inform decisions, are updated based on learning achieved from those decisions, and ultimately inform future decisions.
Impact of the Cancer Prevention and Control Research Network
Ribisl, Kurt M.; Fernandez, Maria E.; Friedman, Daniela B.; Hannon, Peggy; Leeman, Jennifer; Moore, Alexis; Olson, Lindsay; Ory, Marcia; Risendal, Betsy; Sheble, Laura; Taylor, Vicky; Williams, Rebecca; Weiner, Bryan J.
2018-01-01
The Cancer Prevention and Control Research Network (CPCRN) is a thematic network dedicated to accelerating the adoption of evidence-based cancer prevention and control practices in communities by advancing dissemination and implementation science. Funded by the Centers for Disease Control and Prevention and National Cancer Institute, CPCRN has operated at two levels: Each participating Network Center conducts research projects with primarily local partners as well as multicenter collaborative research projects with state and national partners. Through multicenter collaboration, thematic networks leverage the expertise, resources, and partnerships of participating centers to conduct research projects collectively that might not be feasible individually. Although multicenter collaboration often is advocated, it is challenging to promote and assess. Using bibliometric network analysis and other graphical methods, this paper describes CPCRN’s multicenter publication progression from 2004 to 2014. Searching PubMed, Scopus, and Web of Science in 2014 identified 249 peer-reviewed CPCRN publications involving two or more centers out of 6,534 total. The research and public health impact of these multicenter collaborative projects initiated by CPCRN during that 10-year period were then examined. CPCRN established numerous workgroups around topics such as: 2-1-1, training and technical assistance, colorectal cancer control, federally qualified health centers, cancer survivorship, and human papillomavirus. The paper discusses the challenges that arise in promoting multicenter collaboration and the strategies that CPCRN uses to address those challenges. The lessons learned should broadly interest those seeking to promote multisite collaboration to address public health problems, such as cancer prevention and control. PMID:28215371
Wright, Barry; Marshall, David; Adamson, Joy; Ainsworth, Hannah; Ali, Shehzad; Allgar, Victoria; Collingridge Moore, Danielle; Cook, Elizabeth; Dempster, Paul; Hackney, Lisa; McMillan, Dean; Trepél, Dominic; Williams, Chris
2016-01-01
A Social Story™ (Carol Gray) is a child-friendly intervention that is used to give children with autism spectrum disorders (ASDs) social information in situations where they have social difficulties. Limited evidence mainly using single-case designs suggests that they can reduce anxiety and challenging behaviour. The objectives were to conduct a systematic review, use this to develop a manualised intervention and run a feasibility trial to inform a fully powered randomised controlled trial (RCT) on their clinical effectiveness and cost-effectiveness in schools. This is a three-stage study following the Medical Research Council framework for complex interventions. Specifically, it involved a theoretical phase, a qualitative stage and a feasibility trial stage. Qualitative interviews and focus groups took place in Child and Adolescent Mental Health Service and primary care settings. The feasibility study took place in 37 local mainstream schools. Fifty children (aged 5-15 years) in mainstream school settings with a diagnosis of ASD were entered into the trial. For each child, an associated teacher and parent was also recruited. The intervention was a goal-setting session followed by a manualised toolkit (including a training session) for creating Social Stories™ for use with school-aged children. The comparator treatment was a goal-setting session followed by an attention control. Both arms received treatment as usual. Outcomes tested as part of the feasibility study included child- and proxy-completed questionnaires for mental health, quality of life and goal-based outcome measures. Adults additionally completed behaviour diaries and the parental stress index. The review found that the research into social stories is predominantly based in the USA, carried out in under-12-year-olds and using single-case designs. Most studies either did not follow established Social Story criteria or did not report if they did. The assessment of effectiveness presents a largely positive picture but is limited by methodological issues. There were no adequate RCTs and insufficient information to assess a number of important sources of potential bias in most studies. A manualised intervention was produced using an iterative process between user focus groups and a writing team, and assessed in the feasibility study. All 50 participant groups were recruited within the study time frame. Two outcome measures, the Social Responsiveness Scale-2 and the custom-made goal-based measure, showed high levels of completion rates and appeared to be capturing social and behaviour skills targeted by the use of Social Stories. Detailed recommendations for a full trial are provided. Blinding of participants was not feasible. Treatment fidelity was not assessed because of low levels of story return rates. The study showed that a fully powered RCT is feasible with an extended geographical footprint. A large amount of data and information has helped to inform the design of this RCT, which will be the subject of a future research grant application. Future work could focus on developing an appropriate blinded outcome measure for this population. This study is registered as PROSPERO CRD42011001440. Current Controlled Trials ISRCTN96286707. This project was funded by the NIHR Health Technology Assessment programme and will be published in full in Health Technology Assessment; Vol. 20, No. 6. See the NIHR Journals Library website for further project information.
Direct adaptive robust tracking control for 6 DOF industrial robot with enhanced accuracy.
Yin, Xiuxing; Pan, Li
2018-01-01
A direct adaptive robust tracking control is proposed for trajectory tracking of 6 DOF industrial robot in the presence of parametric uncertainties, external disturbances and uncertain nonlinearities. The controller is designed based on the dynamic characteristics in the working space of the end-effector of the 6 DOF robot. The controller includes robust control term and model compensation term that is developed directly based on the input reference or desired motion trajectory. A projection-type parametric adaptation law is also designed to compensate for parametric estimation errors for the adaptive robust control. The feasibility and effectiveness of the proposed direct adaptive robust control law and the associated projection-type parametric adaptation law have been comparatively evaluated based on two 6 DOF industrial robots. The test results demonstrate that the proposed control can be employed to better maintain the desired trajectory tracking even in the presence of large parametric uncertainties and external disturbances as compared with PD controller and nonlinear controller. The parametric estimates also eventually converge to the real values along with the convergence of tracking errors, which further validate the effectiveness of the proposed parametric adaption law. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The results of marketing, economic, and financial studies are reported in this volume.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less
Lindhardt, T; Nielsen, M H
2017-01-01
Malnutrition is frequent in older people and a precursor for morbidity and hospitalisation; furthermore low intake and weight loss during and after hospitalisation is well-described. Such patients are often excluded from technology projects on account of lack of skills. This is a barrier for their access to many current and future health care offers. To test the acceptability, feasibility and preliminary efficacy of technology-supported energy- and protein-enforced homedelivered meals for older patients discharged from hospital. Mixed method design including a quasi-experimental controlled feasibility trial and embedded qualitative interviews. Older medical patients (mean age 79.4 years; women 66.7%) at nutritional risk and discharged to own home were included consecutively to first the control group (n=18) and later the intervention group (n=18). Nine intervention and 16 control group patients completed the project. Intervention: group received: 1) enriched meals delivered to participants' homes 12 weeks after discharge, and 2) a tablet computer combining goal setting for intake with self-monitoring and feedback. Control group were treated as usual. Data collection was done at baseline, and at six and 12 weeks follow-up. Feasibility evaluation focused on 1) inclusion and retention and 2) acceptability and functionality of the intervention. Efficacy primary endpoint: Muscle strength and BMI. Secondary: Health related quality of life (HRQoL), depression; readmissions, mortality. Technology challenges were related to immaturity of the out-of hospital app version; however, participants were motivated and capable of using the device. Inclusion and retention was challenged by the acceptability of the nutritional intervention and exhaustion among patients. Mortality was high. Although weaker at baseline the intervention group increased their muscle strength more consistently than did the control group: Handgrip strength with 2.5kg vs 0.9kg and chairto-stand-test with 3.3 vs. 1.8 times. They also improved their depression score and HRQoL more, and patients reported increased intake, appetite, and energy in the interviews. Relatives confirmed this and also reported positive impact on their level of worry and on the relationship with the older person. The study provided valuable insight into appropriate methods and procedures as well as older people's preferences and views on barriers to successful intervention and use of technology in health care. This will guide the design of a future sufficiently powered study. Effect evaluation provided guidance for future sample size calculation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Design of a Solar Sail Mission to Mars
NASA Technical Reports Server (NTRS)
Feaux, K.; Jordan, W.; Killough, G.; Miller, R.; Plunk, V.
1989-01-01
A new area of interest in space vehicles is the solar sail. Various applications for which it has been considered are attitude control of satellites, focusing light on the jungles of Vietnam, and a Halley's comet rendezvous. Although for various reasons these projects were never completed, new interest in solar sails has arisen. The solar sail is an alternative to the rocket-propelled space vehicle as an interplanetary cargo vehicle, and manufacture of solar sails on the space station is a possibility. Solar sails have several advantages over rockets, including an unlimited power supply and low maintenance. The purpose of this project is to design a solar sail mission to Mars. The spacecraft will efficiently journey to Mars powered only by a solar sail. The vehicle weighs 487.16 kg and will be launchable on an expendable launch vehicle. The project includes an investigation of options to minimize cost, weight, and flight duration. The design of the sail and its deployment system are a major part of the project, as is the actual mission planning. Various topics researched include solar power, material, space environment, thermal control, trajectories, and orbit transfer. Various configurations are considered in order to determine the optimal structure. Another design consideration is the control system of the vehicle. This system includes the attitude control and the communication system of the sail. This project will aid in determining the feasibility of a solar sail and will raise public interest in space research.
Anderson, D P; McMurtrie, P; Edge, K-A; Baxter, P W J; Byrom, A E
2016-12-01
Successful pest-mammal eradications from remote islands have resulted in important biodiversity benefits. Near-shore islands can also serve as refuges for native biota but require ongoing effort to maintain low-pest or pest-free status. Three management options are available in the presence of reinvasion risk: (1) control-to-zero density, in which immigration may occur but reinvaders are removed; (2) sustained population suppression (to relatively low numbers); or (3) no action. Biodiversity benefits can result from options one and two. The management challenge is to make evidence-based decisions on the selection of an appropriate objective and to identify a financially feasible control strategy that has a high probability of success. This requires understanding the pest species population dynamics and how it will respond to a range of potential management strategies, each with an associated financial cost. We developed a two-stage modeling approach that consisted of (1) Bayesian inferential modeling to estimate parameters for a model of pest population dynamics and control, and (2) a forward projection model to simulate a range of plausible management scenarios and quantify the probability of obtaining zero density within four years. We applied the model to an ongoing, six-year trapping program to control stoats (Mustela erminea) on Resolution Island, New Zealand. Zero density has not yet been achieved. Results demonstrate that management objectives were impeded by a combination of a highly fecund population, insufficient trap attractiveness, and a substantial proportion of the population that did not enter traps. Immigration is known to occur because the founding population arrived on the island by swimming from the mainland. However, immigration rate during this study was indistinguishable from zero. The forward projection modeling showed that control-to-zero density was feasible but required greater than a two-fold budget increase to intensify the trapping rate relative to population growth. The two-stage modeling provides the foundation for a management program in which broad-scale trials of additional trapping effort or improved trap lures would test model predictions and increase our understanding of system dynamics. © 2016 by the Ecological Society of America.
Powell, Jane E; Carroll, Fran E; Sebire, Simon J; Haase, Anne M; Jago, Russell
2013-01-01
Background There is currently little guidance for pilot trial economic evaluation where health outcomes and costs are influenced by a range of wider determinants and factors. Objectives This article presents the findings of a pilot economic evaluation study running alongside the Bristol Girls Dance Project (BGDP) feasibility study. Design 3-arm, cluster randomised, controlled pilot trial and economic evaluation. 7 schools (n=210) from the Bristol and greater Bristol area, UK were randomly allocated to the intervention arm 3 schools (n=90) and the control arm 4 schools (n=120). Intervention Girls aged 11–12 years with parental consent were provided with two, 90 min dance sessions per week for 9 weeks at school facilities. Economic outcome measures Programme costs and girls’ preferences for attributes of dance and preferences for competing leisure time activities were measured. Results The mainstream average cost of the BGDP programme (not including research, control and dance teacher training costs) per school was $2126.40, £1329 and €1555 and per participant was $70.90, £44.31 and €51.84 in 2010–2011 prices. Discrete choice experiment (DCE) methods are acceptable to girls of this age indicating time available for other leisure activities on dance class days is the attribute girls valued most and 2 h leisure time remaining preferred to 3 h. Conclusions This pilot study indicates that providing full cost data for a future trial of the BGDP programme is feasible and practical. There is no evidence from preference data to support adjustment to intervention design. A future economic evaluation is likely to be successful utilising the resource use checklist developed. The importance of categorising separately resources used to develop, prepare, deliver and maintain the programme to estimate mainstream costs accurately is demonstrated. PMID:24362013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Love, Lonnie J.; Mell, Ellen
2015-02-01
AeroValve s innovative pneumatic valve technology recycles compressed air through the valve body with each cycle of the valve, and was reported to reduce compressed air requirements by an average of 25% 30%.This technology collaboration project between ORNL and Aerovalve confirms the energy efficiency of valve performance. Measuring air consumption per work completed, the AeroValve was as much as 85% better than the commercial Festo valve.
Line Fluid Actuated Valve Development Program. [for application on the space shuttle
NASA Technical Reports Server (NTRS)
Lynch, R. A.
1975-01-01
The feasibility of a line-fluid actuated valve design for potential application as a propellant-control valve on the space shuttle was examined. Design and analysis studies of two prototype valve units were conducted and demonstrated performance is reported. It was shown that the line-fluid actuated valve concept offers distinct weight and electrical advantages over alternate valve concepts. Summaries of projected performance and design goals are also included.
ERIC Educational Resources Information Center
James, Arthur; Arboleda, Jairo
1979-01-01
Plans for a nationwide system of education at a distance in Colombia, South America, are now under way to meet growing demands for higher education and to decentralize the current university system. Prior to this decision, a feasibility project was undertaken by the University of Antioquia. The project and results are reported. (Author/JMD)
ERIC Educational Resources Information Center
Wisconsin Univ., Madison.
This document is the second volume of the feasibility study report for the Wisconsin Elementary Teacher Education Project. It provides in part 1 data on program, planning and budgeting, including cost figures for preparing students in the present and new programs, marginal expenses, and costs for implementing the program on other campuses. Part 2…
Feasibility Study & Design of Brightfield Solar Farm
DOE Office of Scientific and Technical Information (OSTI.GOV)
Law, Susan
2014-09-28
This Congressionally Directed Project originally provided funds to the Township of Lower Providence, Pennsylvania for the purpose of investigating the potential for a renewable energy generation facility to make beneficial reuse of a closed landfill located within the Township, known as Moyer Landfill. Early in the course of the project, it was determined through collaboration and discussion with DOE to alter the scope of the project to include a feasibility assessment of a landfill solar project, as well as to construct a demonstration solar project at the municipal facilities to provide an educational and community outreach opportunity for the Townshipmore » to offer regarding solar photovoltaic (“PV”) electricity generation.« less
Technical Analysis Feasibility Study on Smart Microgrid System in Sekolah Tinggi Teknik PLN
NASA Astrophysics Data System (ADS)
Suyanto, Heri
2018-02-01
Nowadays application of new and renewable energy as main resource of power plant has greatly increased. High penetration of renewable energy into the grid will influence the quality and reliability of the electricity system, due to the intermittent characteristic of new and renewable energy resources. Smart grid or microgrid technology has the ability to deal with this intermittent characteristic especially if these renewable energy resources integrated to grid in large scale, so it can improve the reliability and efficiency of the grid. We plan to implement smart microgrid system at Sekolah Tinggi Teknik PLN as a pilot project. Before the pilot project start, the feasibility study must be conducted. In this feasibility study, the renewable energy resources and load characteristic at the site will be measured. Then the technical aspect of this feasibility study will be analyzed. This paper explains that analysis of ths feasibility study.
Kolmodin MacDonell, Karen; Naar, Sylvie; Gibson-Scipio, Wanda; Lam, Phebe; Secord, Elizabeth
2016-10-01
To conduct a randomized controlled pilot of a multicomponent, technology-based intervention promoting adherence to controller medication in African-American emerging adults with asthma. The intervention consisted of two computer-delivered sessions based on motivational interviewing combined with text messaged reminders between sessions. Participants (N = 49) were 18-29 years old, African-American, with persistent asthma requiring controller medication. Participants had to report poor medication adherence and asthma control. Youth were randomized to receive the intervention or an attention control. Data were collected through computer-delivered self-report questionnaires at baseline, 1, and 3 months. Ecological Momentary Assessment via two-way text messaging was also used to collect "real-time" data on medication use and asthma control. The intervention was feasible and acceptable to the target population, as evidenced by high retention rates and satisfaction scores. Changes in study outcomes from pre- to postintervention favored the intervention, particularly for decrease in asthma symptoms, t (42) = 2.22, p < .05 (Cohen's d = .071). Results suggest that the intervention is feasible and effective. However, findings are preliminary and should be replicated with a larger sample and more sophisticated data analyses. Copyright © 2016 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
Landfill Gas Energy Project Development Handbook
View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Folkedahl, Bruce
Much attention has been focused on renewable energy use in large-scale utilities and very small scale distributed energy systems. However, there is little information available regarding renewable energy options for midscale municipal utilities. The Willmar Municipal Utilities Corn Cob-Coal Co-Combustion Project was initiated to investigate opportunities available for small to midscale municipal utilities to "go green". The overall goal of the Project was to understand the current renewable energy research and energy efficiency projects that are or have been implemented at both larger and smaller scale and determine the applicability to midscale municipal utilities. More specific objectives for Task 2.0more » of this project were to determine the technical feasibility of co-combusting com cobs with coal in the existing WMU boiler, and to identify any regulatory issues that might need to be addressed if WMU were to obtain a significant portion of its heat from such co-combustion. This report addresses the issues as laid out in the study proposal. The study investigated the feasibility of and demonstrated the technical effectiveness of co-combusting corn cobs with coal in the Willmar Municipal Utilities stoker boiler steam generation power plant. The results of the WMU Co-Combustion Project will serve as a model for other midscale utilities who wish to use corn cobs to generate renewable electrical energy. As a result of the Co-Combustion Project, the WMU plans to upgrade their stoker boiler to accept whole corn cobs as well as other types of biomass, while still allowing the fuel delivery system to use 100% coal as needed. Benefits of co-combustion will include: energy security, reduced Hg and CO 2 air emissions, improved ash chemistry, potential future carbon credit sales, an immediate positive effect on the local economy, and positive attention focused on the WMU and the City of Willmar. The first step in the study was to complete a feasibility analysis. The feasibility analysis anticipated only positive results from the combustion of corn cobs with coal in the WMU power plant boiler, and therefore recommended that the project proceed. The study proceeded with a review of the existing WMU Power Plant configuration; cob fuel analyses; an application for an Air Quality Permit from the Minnesota Pollution Control Agency to conduct the co-combustion test burns; identification of and a site visit to a similar facility in Iowa; an evaluation of cob grinding machines; and agreements with a corn grower, a cob harvester, and the City of Willmar to procure, harvest, and store cobs. The WMU power plant staff constructed a temporary cob feed system whereby the cobs could be injected into the #3 Boiler firebox, at rates up to 40% of the boiler total heat input. Test burns were conducted, during which air emissions were monitored and fuel and ash samples analyzed. The results of the test burns indicated that the monitored flue gas quality improved slightly during the test burns. The WMU was able to determine that modifications to the #3 Boiler fuel feed system to accept com cobs on a permanent basis would be technically feasible and would enable the WMU to generate electricity from renewable fuels on a dispatchable basis.« less
Systems Analysis and Design for Decision Support Systems on Economic Feasibility of Projects
NASA Astrophysics Data System (ADS)
Balaji, S. Arun
2010-11-01
This paper discuss about need for development of the Decision Support System (DSS) software for economic feasibility of projects in Rwanda, Africa. The various economic theories needed and the corresponding formulae to compute payback period, internal rate of return and benefit cost ratio of projects are clearly given in this paper. This paper is also deals with the systems flow chart to fabricate the system in any higher level computing language. The various input requirements from the projects and the output needed for the decision makers are also included in this paper. The data dictionary used for input and output data structure is also explained.
Hualapai Wind Project Feasibility Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davidson, Kevin; Randall, Mark; Isham, Tom
The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less
Integrated Mid-Continent Carbon Capture, Sequestration & Enhanced Oil Recovery Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brian McPherson
2010-08-31
A consortium of research partners led by the Southwest Regional Partnership on Carbon Sequestration and industry partners, including CAP CO2 LLC, Blue Source LLC, Coffeyville Resources, Nitrogen Fertilizers LLC, Ash Grove Cement Company, Kansas Ethanol LLC, Headwaters Clean Carbon Services, Black & Veatch, and Schlumberger Carbon Services, conducted a feasibility study of a large-scale CCS commercialization project that included large-scale CO{sub 2} sources. The overall objective of this project, entitled the 'Integrated Mid-Continent Carbon Capture, Sequestration and Enhanced Oil Recovery Project' was to design an integrated system of US mid-continent industrial CO{sub 2} sources with CO{sub 2} capture, and geologicmore » sequestration in deep saline formations and in oil field reservoirs with concomitant EOR. Findings of this project suggest that deep saline sequestration in the mid-continent region is not feasible without major financial incentives, such as tax credits or otherwise, that do not exist at this time. However, results of the analysis suggest that enhanced oil recovery with carbon sequestration is indeed feasible and practical for specific types of geologic settings in the Midwestern U.S.« less
1995-05-01
K Task 10c - Water Quality and Hydrology Assessment APPENDIX L Task 10d - Archaeological/Historic Assessment APPENDIX M Task l~e - Ecological ...options to select a proposed project. The first phase included feasibility level design, cost estimating, water quality, ecological , archaeological and...Assessment 47 Ecological Assessment 49 Historic/Archaeological Assessment 53 Socio/Economic Assessment 54 Proposed Project 57 Chapter 7. PRELIMINARY
AIDS Community Demonstration Projects for HIV prevention among hard-to-reach groups.
O'Reilly, K R; Higgins, D L
1991-01-01
The AIDS Community Demonstration Projects are multicenter prevention projects directing community-based interventions to members of hard-to-reach groups at risk of infection from human immunodeficiency virus (HIV), which causes acquired immunodeficiency syndrome (AIDS). The projects are supported by the Centers for Disease Control (CDC). Interventions are derived from theories of behavior change and have as their goal reducing HIV and other sexually transmitted diseases in the communities. The current objectives, intentionally narrow to improve the project's specificity and clarity, are to increase the use of condoms in sexual activity and the use of bleach to clean injecting drug equipment. Additional objectives may be added. The impact of the interventions is seen in increases in the use of HIV counseling and testing services, decreases in all or specific sexual and drug-use risk behaviors, and requests for related social and public health services. A quasi-experimental research design is being used to evaluate the projects. Multiple evaluation measures are used, including a street-based interview with randomly identified respondents in both intervention and control communities. Success in facilitating HIV and AIDS risk reduction is being measured using a model of behavior change describing stages of change. Upon successful completion of these projects in 1994, CDC may be able to offer models of effective, feasible, and easy-to-monitor State and local health departments and community-based organizations. PMID:1659721
Landfill Gas Energy Project Development Handbook Files
View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.
NASA Astrophysics Data System (ADS)
Ross, K. W.; Childs-Gleason, L. M.; Cripps, G. S.; Clayton, A.; Remillard, C.; Watkins, L. E.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.
2017-12-01
The NASA DEVELOP National Program carries out many projects every year with the goal of bringing the benefits of NASA Earth science to bear on decision-making challenges that are local in scale. Every DEVELOP project partners end users with early/transitioning science professionals. Many of these projects invited communities to consider NASA science data in new ways to help them make informed decisions. All of these projects shared three characteristics: they were rapid, nimble and risk-taking. These projects work well for some communities, but might best be suited as a feasibility studies that build community/institutional capacity towards eventual solutions. This presentation will discuss DEVELOP's lessons learned and best practices in conducting short-term feasibility projects with communities, as well as highlight several past successes.
Locked on course: Hydro-Quebec`s commitment to mega-projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro
1997-01-01
Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier successmore » with large projects, (2) its engineering culture`s norms for consistency, and (3) its role in the government`s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects.« less
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2014 CFR
2014-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2013 CFR
2013-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2012 CFR
2012-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
Kolehmainen, Niina; Francis, Jillian J; Ramsay, Craig R; Owen, Christine; McKee, Lorna; Ketelaar, Marjolijn; Rosenbaum, Peter
2011-11-07
Children with motor impairments (e.g. difficulties with motor control, muscle tone or balance) experience significant difficulties in participating in physical play and leisure. Current interventions are often poorly defined, lack explicit hypotheses about why or how they might work, and have insufficient evidence about effectiveness. This project will identify (i) the 'key ingredients' of an effective intervention to increase participation in physical play and leisure in children with motor impairments; and (ii) how these ingredients can be combined in a feasible and acceptable intervention. The project draws on the WHO International Classification of Functioning, Disability and Health and the UK Medical Research Council guidance for developing 'complex interventions'. There will be five steps: 1) identifying biomedical, personal and environmental factors proposed to predict children's participation in physical play and leisure; 2) developing an explicit model of the key predictors; 3) selecting intervention strategies to target the predictors, and specifying the pathways to change; 4) operationalising the strategies in a feasible and acceptable intervention; and 5) modelling the intervention processes and outcomes within single cases. The primary output from this project will be a detailed protocol for an intervention. The intervention, if subsequently found to be effective, will support children with motor difficulties to attain life-long well-being and participation in society. The project will also be an exemplar of methodology for a systematic development of non-drug interventions for children.
2011-01-01
Background Children with motor impairments (e.g. difficulties with motor control, muscle tone or balance) experience significant difficulties in participating in physical play and leisure. Current interventions are often poorly defined, lack explicit hypotheses about why or how they might work, and have insufficient evidence about effectiveness. This project will identify (i) the 'key ingredients' of an effective intervention to increase participation in physical play and leisure in children with motor impairments; and (ii) how these ingredients can be combined in a feasible and acceptable intervention. Methods/Design The project draws on the WHO International Classification of Functioning, Disability and Health and the UK Medical Research Council guidance for developing 'complex interventions'. There will be five steps: 1) identifying biomedical, personal and environmental factors proposed to predict children's participation in physical play and leisure; 2) developing an explicit model of the key predictors; 3) selecting intervention strategies to target the predictors, and specifying the pathways to change; 4) operationalising the strategies in a feasible and acceptable intervention; and 5) modelling the intervention processes and outcomes within single cases. Discussion The primary output from this project will be a detailed protocol for an intervention. The intervention, if subsequently found to be effective, will support children with motor difficulties to attain life-long well-being and participation in society. The project will also be an exemplar of methodology for a systematic development of non-drug interventions for children. PMID:22061203
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The ''Disposal of Waste or Excess High Explosives'' project began January 1971. Various methods of disposal were investigated with the conclusion that incineration, at major ERDA facilities, would be the most feasible and safest method with the least cost and development time required. Two independent incinerator concepts were investigated: a rotary type for continuous processing and an enclosed pit type for batch processing. Both concepts are feasible; however, it is recommended that further investigations would be required to render them acceptable. It is felt that a larger effort would be required in the case of the rotary incinerator. The projectmore » was terminated (December 1976) prior to completion as a result of a grant of authority by the Texas Air Control Board allowing the ERDA Pantex Plant to continue indefinitely outdoor burning of explosives.« less
Learmonth, Yvonne C; Adamson, Brynn C; Kinnett-Hopkins, Dominique; Bohri, Maria; Motl, Robert W
2017-03-01
There is increasing recognition that exercise is an efficacious strategy for managing many consequences of multiple sclerosis (MS), yet persons with MS are not engaging in sufficient exercise for accruing health benefits. Poor exercise uptake might be associated with the design of previous research. We conducted a randomised controlled trial (RCT) for examining the feasibility of a 4-month home-based, exercise-training program designed based on recent physical activity guidelines for MS and supplemented by behavioural strategies for compliance. Feasibility was assessed in the domains of process (e.g., recruitment), resource (e.g., monetary costs), management (e.g., personnel time requirements) and scientific outcomes (e.g., treatment effect). We recruited persons with mild-to-moderate MS who were randomised into an intervention or wait-list control condition. Intervention participants received a pedometer, elastic resistance bands, DVD, training manual, calendars, log-book, video coaching calls and newsletters. Participants in both conditions completed home-based assessments before and after the 4-month period. Ninety-nine persons with MS were assessed for eligibility, and 57 were randomised. Fifty-one persons completed the study (90%). Total costs of the study were US $5331.03. Personnel time to conduct the study totaled 263h. Participants in the intervention group complied fully with 71% of all exercise sessions. There was a moderate increase in self-reported exercise behaviour of the intervention participants as measured by the Godin Leisure-Time Exercise Questionnaire (d≥0.5). The results support the feasibility and acceptability of a home-based exercise intervention based on physical activity guidelines and supplemented with behavioural strategies for adults with mild-to-moderate MS. Copyright © 2016 Elsevier Inc. All rights reserved.
Brigham City Hydro Generation Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ammons, Tom B.
Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicatedmore » that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.« less
Mississippi River Headwaters Lakes in Minnesota. Feasibility Study. Main Report.
1982-09-01
in Leech lake and marsh restoration; and a review of the adequacy and effectiveness of the existing flood control project for Aitkin, Pine Knoll and...be retained plans in accordance with the Department of Army Regulations now in effect . The recommended plan should incorporate conservation features...BENEFITS ($1,000’s) 96 COMPARISON OF LOW FLOW NONEXCEEDANCE AT ANOKA 99 RANKING OF PLANS 100 EFFECTS OF PLANS ON PHYSICAL IMPACT AREA 103 SUMMARY OF
NASA Astrophysics Data System (ADS)
Zhao, L. W.; Du, J. G.; Yin, J. L.
2018-05-01
This paper proposes a novel secured communication scheme in a chaotic system by applying generalized function projective synchronization of the nonlinear Schrödinger equation. This phenomenal approach guarantees a secured and convenient communication. Our study applied the Melnikov theorem with an active control strategy to suppress chaos in the system. The transmitted information signal is modulated into the parameter of the nonlinear Schrödinger equation in the transmitter and it is assumed that the parameter of the receiver system is unknown. Based on the Lyapunov stability theory and the adaptive control technique, the controllers are designed to make two identical nonlinear Schrödinger equation with the unknown parameter asymptotically synchronized. The numerical simulation results of our study confirmed the validity, effectiveness and the feasibility of the proposed novel synchronization method and error estimate for a secure communication. The Chaos masking signals of the information communication scheme, further guaranteed a safer and secured information communicated via this approach.
NASA Astrophysics Data System (ADS)
Beddow, B.; Roberts, C.; Rankin, J.; Bloch, A.; Peizer, J.
1981-01-01
The National Accident Sampling System (NASS) is described. The study area discussed is one of the original ten sites selected for NASS implementation. In addition to collecting data from the field, the original ten sites address questions of feasibility of the plan, projected results of the data collection effort, and specific operational topics, e.g., team size, sampling requirements, training approaches, quality control procedures, and field techniques. Activities and results of the first three years of the project, for both major tasks (establishment and operation) are addressed. Topics include: study area documentation; team description, function and activities; problems and solutions; and recommendations.
BUILDING MATERIALS RECLAMATION PROGRAM
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Weggel; Shen-En Chen; Helene Hilger
2010-08-31
This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less
78 FR 60271 - Project No. 13599-001
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13599-001] Green Power... (FPA), proposing to study the feasibility of the Lake 3160 Hydroelectric Project (project) to be.... The project would occupy about 475 acres of lands within the Tongass National Forest managed by the U...
Conceptual Thermal Treatment Technologies Feasibility Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suer, A.
1996-02-28
This report presents a conceptual Thermal Treatment Technologies Feasibility Study (FS) for the Savannah River Site (SRS) focusing exclusively on thermal treatment technologies for contaminated soil, sediment, or sludge remediation projects.
Reza-Paul, Sushena; Lazarus, Lisa; Doshi, Monika; Hafeez Ur Rahman, Syed; Ramaiah, Manjula; Maiya, Raviprakash; MS, Venugopal; Venukumar, K. T.; Sundararaman, Sundar; Becker, Marissa; Moses, Stephen; Lorway, Robert
2016-01-01
Background HIV prevalence among female sex workers (FSWs) in India remains well above the national average. Pre-exposure prophylaxis (PrEP), a new HIV prevention technology, may help to reduce HIV incidence, but there is a dearth of research that can inform the potential scale-up of PrEP in India. In partnership with Ashodaya Samithi, a local sex worker collective, we conducted a feasibility study to assess acceptance of a planned PrEP demonstration project, willingness to use PrEP, and recommendations for project roll-out among FSWs in southern Karnataka. Methods From January–April 2015, 6 focus group discussions, 47 in-depth interviews, and 427 interviewer-administered questionnaires were completed by female sex workers. All participants were 18 years of age or older and practiced sex work. Qualitative data were coded for key themes and emergent categories. Univariate descriptive analysis was employed to summarise the quantitative data. Results Qualitative. PrEP was described as an exciting new prevention technology that places control in the hands of FSWs and provides a “double safety” in combination with condom use. Participants expressed agreement that women who may experience more HIV risk in their occupational environments should be prioritized for enrollment into a demonstration project. Quantitative. 406 participants (95%) expressed interest in PrEP. Participants prioritized the inclusion of FSWs under the age of 25 (79%), those who do not use condoms when clients offer more money (58%), who do not consistently use condoms with regular partners (57%), who drink alcohol regularly (49%), and who do not use condoms consistently with clients (48%). Discussion This feasibility study indicated strong interest in PrEP and a desire to move forward with the demonstration project. Participants expressed their responses in terms of public health discourses surrounding risk, pointing to the importance of situating PrEP scale up within the trusted spaces of community-based organizations as a means of supporting PrEP uptake and adherence. PMID:27880833
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
ERIC Educational Resources Information Center
IntelliSys, Inc., Syracuse, NY.
This was Phase I of a three-phased project. This phase of the project investigated the feasibility of a computer-based instruction (CBI) workstation, designed for use by teachers of handicapped students within a school structure. This station is to have as a major feature the ability to produce in-house full-motion video using one of the…
ERIC Educational Resources Information Center
WHEELER, C. HERBERT, JR.
THIS STUDY WAS CONDUCTED TO DETERMINE THE FEASIBILITY OF USING TRAVELING OR MOBILE UNITS TO IMPROVE THE QUALITY OF EDUCATION IN THE APPALACHIA REGION. IT EXAMINED THE LITERATURE WRITTEN IN THE LAST TEN YEARS ON EDUCATIONAL PROJECTS USING SOME FORM OF MOBILE FACILITY. FROM THIS LITERATURE A LIST OF PLANNED MOBILE PROJECTS WAS COMPILED AND…
Design of a vibration isolation system for a cycle ergometer to be used onboard the Space Shuttle
NASA Technical Reports Server (NTRS)
Pearson, Lillian; Tait, Steven; Trevino, Maurice
1991-01-01
Low frequency vibrations generated during exercise using the cycle ergometer onboard the Space Shuttle are disrupting sensitive microgravity experiments. The design team is asked by NASA/USRA to generate alternatives for the design of a vibration isolation system for the cycle ergometer. It is the design team's objective to present alternative designs and a problem solution for a vibration isolation system for an exercise cycle ergometer to be used onboard the Space Shuttle. In the development of alternative designs, the design team emphasizes passive systems as opposed to active control systems. This decision is made because the team feels that passive systems are less complex than active control systems, external energy sources are not required, and mass is reduced due to the lack of machinery such as servomotors or compressors typical of active control systems. Eleven alternative designs are developed by the design team. From these alternatives, three active control systems are included to compare the benefits of active and passive systems. Also included in the alternatives is an isolation system designed by an independent engineer that was acquired late in the project. The eight alternatives using passive isolation systems are narrowed down by selection criteria to four considered to be the most promising by the design team. A feasibility analysis is performed on these four passive isolation systems. Based on the feasibility analysis, a final design solution is chosen and further developed. From the development of the design, the design team has concluded that passive systems are not effective at isolating vibrations for the low frequencies considered for this project. Recommendations are made for guidelines of passive isolation design and application of such systems.
Development and test of an HTSMA supersonic inlet ramp actuator
NASA Astrophysics Data System (ADS)
Quackenbush, Todd R.; Carpenter, Bernie F.; Boschitsch, Alexander H.; Danilov, Pavel V.
2008-03-01
Use of Shape Memory Alloy (SMA) actuation technology is a candidate method for reducing weight and power requirements for inlet flow control actuators in prospective supersonic passenger aircraft. The high speed/high Mach operating points of such aircraft can also call for the use of High Temperature SMAs, with transition temperatures beyond those of typical binary NiTi alloys. This paper outlines a demonstration project that entailed both testing and assessment of newly developed NiTiPt HTSMAs, as well as their use in an actuation application representative of inlet configurations. The project featured benchtop testing of an HTSMA-actuated ramp model as well as experiments in a high speed wind tunnel at loads representative of supersonic conditions. The ability of the model to generate adequate force and actuation stroke for this application is encouraging evidence the feasibility of NiTiPt-based devices for inlet flow control.
Baygi, Mahdi Oloumi; Ghazi, Reza; Monfared, Mohammad
2014-07-01
Applying the min-projection strategy (MPS) to a three-phase grid-connected inverter to improve its transient performance is the main objective of this paper. For this purpose, the inverter is first modeled as a switched linear system. Then, the feasibility of the MPS technique is investigated and the stability criterion is derived. Hereafter, the fundamental equations of the MPS for the control of the inverter are obtained. The proposed scheme is simulated in PSCAD/EMTDC environment. The validity of the MPS approach is confirmed by comparing the obtained results with those of VOC method. The results demonstrate that the proposed method despite its simplicity provides an excellent transient performance, fully decoupled control of active and reactive powers, acceptable THD level and a reasonable switching frequency. Copyright © 2014 ISA. Published by Elsevier Ltd. All rights reserved.
The CELSS breadboard project: Plant production
NASA Technical Reports Server (NTRS)
Knott, William M.
1990-01-01
NASA's Breadboard Project for the Controlled Ecological Life Support System (CELSS) program is described. The simplified schematic of a CELSS is given. A modular approach is taken to building the CELSS Breadboard. Each module is researched in order to develop a data set for each one prior to its integration into the complete system. The data being obtained from the Biomass Production Module or the Biomass Production Chamber is examined. The other primary modules, food processing and resource recovery or waste management, are discussed briefly. The crew habitat module is not discussed. The primary goal of the Breadboard Project is to scale-up research data to an integrated system capable of supporting one person in order to establish feasibility for the development and operation of a CELSS. Breadboard is NASA's first attempt at developing a large scale CELSS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RICH, LAUREN
2013-09-30
A two year wind resource assessment was conducted to determine the feasibility of developing a community scale wind generation system for the Upper Skagit Indian Tribe's Bow Hill land base, and the project researched residential wind resource technologies to determine the feasibility of contributing renewable wind resource to the mix of energy options for our single and multi-family residential units.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
...), proposing to study the feasibility of the Verde Pumped Storage Project (project) to be located within the... Company or Salt River Project. The estimated annual generation of the Verde Pumped Storage Project would...
7 CFR 1735.33 - Variable interest rate loans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... downward to a rate not less than the rate determined in the feasibility study on which the loan was based..., projections set forth in the loan feasibility study will be revised annually by RUS (beginning within four... adjusted. The interest rate used in determining feasibility is the rate charged to the borrower until the...
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAM Feasibility Studies § 404.50 What information will be included in the feasibility report prepared... determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project should be authorized for construction, and the reasons supporting the recommendation. This recommendation...
NASA Astrophysics Data System (ADS)
Remillard, C. M.; Madden, M.; Favors, J.; Childs-Gleason, L.; Ross, K. W.; Rogers, L.; Ruiz, M. L.
2016-06-01
The NASA DEVELOP National Program bridges the gap between NASA Earth Science and society by building capacity in both participants and partner organizations that collaborate to conduct projects. These rapid feasibility projects highlight the capabilities of satellite and aerial Earth observations. Immersion of decision and policy makers in these feasibility projects increases awareness of the capabilities of Earth observations and contributes to the tools and resources available to support enhanced decision making. This paper will present the DEVELOP model, best practices, and two case studies, the Colombia Ecological Forecasting project and the Miami-Dade County Ecological Forecasting project, that showcase the successful adoption of tools and methods for decision making. Through over 90 projects each year, DEVELOP is always striving for the innovative, practical, and beneficial use of NASA Earth science data.
González-Pier, Eduardo; Barraza-Lloréns, Mariana; Beyeler, Naomi; Jamison, Dean; Knaul, Felicia; Lozano, Rafael; Yamey, Gavin; Sepúlveda, Jaime
2016-10-01
The United Nations Sustainable Development Goal for health (SDG3) poses complex challenges for signatory countries that will require clear roadmaps to set priorities over the next 15 years. Building upon the work of the Commission on Investing in Health and published estimates of feasible global mortality SDG3 targets, we analysed Mexico's mortality to assess the feasibility of reducing premature (0-69 years) mortality and propose a path to meet SDG3. We developed a baseline scenario applying 2010 age-specific and cause-specific mortality rates from the Mexican National Institute of Statistics and Geography (INEGI) to the 2030 UN Population Division (UNPD) population projections. In a second scenario, INEGI age-specific and cause-specific trends in death rates from 2000 to 2014 were projected to 2030 and adjusted to match the UNPD 2030 mortality projections. A third scenario assumed a 40% reduction in premature deaths across all ages and causes. By comparing these scenarios we quantified shortfalls in mortality reductions by age group and cause, and forecasted life expectancy pathways for Mexico to converge to better performing countries. UNPD-projected death rates yield a 25·9% reduction of premature mortality for Mexico. Accelerated reductions in adult mortality are necessary to reach a 40% reduction by 2030. Mortality declines aggregated across all age groups mask uneven gains across health disorders. Injuries, particularly road traffic accidents and homicides, are the main health challenge for young adults (aged 20-49 years) whereas unabated diabetes mortality is the single most important health concern for older adults (aged 50-69 years). Urgent action is now required to control non-communicable diseases and reduce fatal injuries in Mexico, making a 40% reduction in premature mortality by 2030 feasible and putting Mexico back on a track of substantial life expectancy convergence with better performing countries. Our study provides a roadmap for setting national health priorities. Further analysis of the equity implications of following the suggested pathway remains a subject of future research. Mexico's Ministry of Health, University of California, San Francisco, and Bill & Melinda Gates Foundation. Copyright © 2016 The Author(s). Published by Elsevier Ltd. This is an Open Access article under the CC BY license. Published by Elsevier Ltd.. All rights reserved.
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...
Columbia University's Informatics for Diabetes Education and Telemedicine (IDEATel) Project
Shea, Steven; Starren, Justin; Weinstock, Ruth S.; Knudson, Paul E.; Teresi, Jeanne; Holmes, Douglas; Palmas, Walter; Field, Lesley; Goland, Robin; Tuck, Catherine; Hripcsak, George; Capps, Linnea; Liss, David
2002-01-01
The Columbia University Informatics for Diabetes Education and Telemedicine (IDEATel) Project is a four-year demonstration project funded by the Centers for Medicare and Medicaid Services with the overall goals of evaluating the feasibility, acceptability, effectiveness, and cost-effectiveness of telemedicine in the management of older patients with diabetes. The study is designed as a randomized controlled trial and is being conducted by a state-wide consortium in New York. Eligibility requires that participants have diabetes, are Medicare beneficiaries, and reside in federally designated medically underserved areas. A total of 1,500 participants will be randomized, half in New York City and half in other areas of the state. Intervention participants receive a home telemedicine unit that provides synchronous videoconferencing with a project-based nurse, electronic transmission of home fingerstick glucose and blood pressure data, and Web access to a project Web site. End points include glycosylated hemoglobin, blood pressure, and lipid levels; patient satisfaction; health care service utilization; and costs. The project is intended to provide data to help inform regulatory and reimbursement policies for electronically delivered health care services. PMID:11751803
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1983-12-30
The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
..., proposing to study the feasibility of Project Green Dream (Project No. 13625), to be located at the New... Dam are owned and operated by the U.S. Army Corps of Engineers. Project Green Dream would include new...
1986-06-09
PROJECT. TASK University of the District of Columbia AREA & WORK UNIT NUMBERS Howard University Washington, D.C. 1" CONTROLLING OFFICE NAME AND...Arthur N. Thorpe, Ph.D. June 9, 1986 U. S. ARMY RESEARCH OFFICE DAAG29-80-G-0013 University of the District of Columbia and Howard University Approved...701. 1958. 9. Speller, L. C. Ph.D. Dissertation, Howard University . 1971. -’ ~ ~ -. -.. o’ -7- 7_ -. -t - --’~ - LOJ 0L ..c U CL) . ...... - -J
Code of Federal Regulations, 2011 CFR
2011-10-01
... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49... project be authorized for construction? In reviewing a feasibility study, Reclamation will assure that the... alternative is clearly supported by the feasibility study, based on application of the following factors...
Quantum controlled-Z gate for weakly interacting qubits
NASA Astrophysics Data System (ADS)
Mičuda, Michal; Stárek, Robert; Straka, Ivo; Miková, Martina; Dušek, Miloslav; Ježek, Miroslav; Filip, Radim; Fiurášek, Jaromír
2015-08-01
We propose and experimentally demonstrate a scheme for the implementation of a maximally entangling quantum controlled-Z gate between two weakly interacting systems. We conditionally enhance the interqubit coupling by quantum interference. Both before and after the interqubit interaction, one of the qubits is coherently coupled to an auxiliary quantum system, and finally it is projected back onto qubit subspace. We experimentally verify the practical feasibility of this technique by using a linear optical setup with weak interferometric coupling between single-photon qubits. Our procedure is universally applicable to a wide range of physical platforms including hybrid systems such as atomic clouds or optomechanical oscillators coupled to light.
Magellan aerobraking periapse corridor design
NASA Technical Reports Server (NTRS)
Cook, Richard A.; Lyons, Daniel T.
1992-01-01
One extended mission idea for the Magellan project uses aerobraking techniques to circularize the current orbit. A major technical issue in this proposal is the design of the periapse altitude corridor. Aerobraking would cause a number of significant side effects on both the spacecraft and ground system. Heating and aerodynamic torques on the spacecraft are key issues, as are the corridor control maneuver frequency and aerobrake duration. Spacecraft and ground systems operational limits have been identified in an attempt to constrain the corridor design. A simulation program has been developed to model the aerobraking corridor control process. This paper presents study results using this program which relate to the feasibility of this aerobraking concept.
Restoring Redundancy to the MAP Propulsion System
NASA Technical Reports Server (NTRS)
O'Donnell, James R., Jr.; Davis, Gary T.; Ward, David K.; Bauer, Frank H. (Technical Monitor)
2002-01-01
The Microwave Anisotropy Probe (MAP) is a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE). Due to the MAP project's limited mass, power, and financial resources, a traditional reliability concept including fully redundant components was not feasible. The MAP design employs selective hardware redundancy, along with backup software modes and algorithms, to improve the odds of mission success. In particular, MAP's propulsion system, which is used for orbit maneuvers and momentum management, uses eight thrusters positioned and oriented in such a way that its thruster-based attitude control modes can maintain three-axis attitude control in the event of the failure of any one thruster.
Advanced reactor site feasibility evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haynes, Mark; Owens, Martin; Southworth, Finis
The report provides a description of the project, summarizes the methodology and results for each task of the project, and ends with the overall project conclusions and recommendations. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.
Cedar-Iowa River Rail transit project feasibility study.
DOT National Transportation Integrated Search
2006-11-09
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of : Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail : service(s) that would operate over existing trackage of the Cedar Rapids...
Fram, Nancy; Morgan, Beverley
2012-03-01
Research shows that nurses want to provide more input into assessing patient acuity, changes in patient needs and staffing requirements. The Dashboard Project involved the further development and application of an electronic monitoring tool that offers a single source of nursing, patient and organizational information. It is designed to help inform nurse staffing decisions within a hospital setting. The Dashboard access link was installed in computers in eight nursing units within the Hamilton Health Sciences (HHS) network. The Dashboard indicators are populated from existing information/patient databases within the Decision Support Department at HHS. Committees composed of the unit manager, staff nurses, project coordinator, financial controller and an information controller met regularly to review the Dashboard indicators. Participants discussed the ability of the indicators to reflect their patients' needs and the feasibility of using the indicators to inform their clinical staffing plans. Project findings suggest that the Dashboard is a work in progress. Many of the indicators that had originally been incorporated were refined and will continue to be revised based on suggestions from project participants and further testing across HHS. Participants suggested the need for additional data, such as the time that nurses are off the unit (for code blue response, patient transfers and accompanying patients for tests); internal transfers/bed moves to accommodate patient-specific issues and particularly to address infection control issues; deaths and specific unit-centred data in addition to the generic indicators. The collaborative nature of the project enabled staff nurses and management to work together on a matter of high importance to both, providing valuable recommendations for shared nursing and interprofessional planning, further Dashboard development and project management.
Wind Fins: Novel Lower-Cost Wind Power System
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Morris; Dr. Will D. Swearingen
This project evaluated the technical feasibility of converting energy from the wind with a novel “wind fin” approach. This patent-pending technology has three major components: (1) a mast, (2) a vertical, hinged wind structure or fin, and (3) a power takeoff system. The wing structure responds to the wind with an oscillating motion, generating power. The overall project goal was to determine the basic technical feasibility of the wind fin technology. Specific objectives were the following: (1) to determine the wind energy-conversion performance of the wind fin and the degree to which its performance could be enhanced through basic designmore » improvements; (2) to determine how best to design the wind fin system to survive extreme winds; (3) to determine the cost-effectiveness of the best wind fin designs compared to state-of-the-art wind turbines; and (4) to develop conclusions about the overall technical feasibility of the wind fin system. Project work involved extensive computer modeling, wind-tunnel testing with small models, and testing of bench-scale models in a wind tunnel and outdoors in the wind. This project determined that the wind fin approach is technically feasible and likely to be commercially viable. Project results suggest that this new technology has the potential to harvest wind energy at approximately half the system cost of wind turbines in the 10kW range. Overall, the project demonstrated that the wind fin technology has the potential to increase the economic viability of small wind-power generation. In addition, it has the potential to eliminate lethality to birds and bats, overcome public objections to the aesthetics of wind-power machines, and significantly expand wind-power’s contribution to the national energy supply.« less
Diesel-fired self-pumping water heater
NASA Astrophysics Data System (ADS)
Gertsmann, Joseph
1994-07-01
The object of this project was to study the feasibility of pumping and heating water by sustained oscillatory vaporization and condensation in a fired heat exchanger. Portable field liquid fueled water heaters would facilitate heating water for sanitation, personal hygiene, food service, laundry, equipment maintenance, and decontamination presently available only from larger, less portable, motorized pumping units. The technical tasks consisted of: development of an analytical model, operation of proof-of-principal prototypes, and determination of the thermal and mechanical relationships to evaluate operating range and control characteristics. Four successive pump models were analyzed and tested. The final analytical model gave reasonable agreement with the experimental results, indicating that the actual pumping effect was an order of magnitude lower than originally anticipated. It was concluded that a thermally-activated self pumping water heater based on the proposed principle is not feasible.
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
2005-06-01
Logistics, BA-5590, BB- 390, BB-2590, PVPC, Iraq, Power Grid, Infrastructure, Cost Estimate, Photovoltaic Power Conversion (PVPC), MPPT 16. PRICE...the cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi electrical infrastructure. This project...cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi infrastructure. The project examines available
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 1 2012-01-01 2012-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 1 2011-01-01 2011-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
Deterministic Joint Remote Preparation of Arbitrary Four-Qubit Cluster-Type State Using EPR Pairs
NASA Astrophysics Data System (ADS)
Li, Wenqian; Chen, Hanwu; Liu, Zhihao
2017-02-01
Using four Einstein-Podolsky-Rosen (EPR) pairs as the pre-shared quantum channel, an economic and feasible scheme for deterministic joint remote preparation of the four-particle cluster-type state is presented. In the scheme, one of the senders performs a four-qubit projective measurement based on a set of ingeniously constructed vectors with real coefficients, while the other performs the bipartite projective measurements in terms of the imaginary coefficients. Followed with some appropriate unitary operations and controlled-NOT operations, the receiver can reconstruct the desired state. Compared with other analogous JRSP schemes, our scheme can not only reconstruct the original state (to be prepared remotely) with unit successful probability, but also ensure greater efficiency.
Missouri toll feasibility study : phase I
DOT National Transportation Integrated Search
2002-05-01
The purpose of this toll feasibility study is to estimate the potential revenue that could be generated from several candidate toll projects within the state. Potential toll revenue may then be considered in combination with other possible funding me...
Feasibility test of CADD Webmenus.
DOT National Transportation Integrated Search
2009-08-01
The Arizona Department of Transportation (ADOT) initiated SPR Project 683: CADD Webmenus Feasibility Study to conduct a proof-of-concept test of Web-based CADD menus for ADOT agency-wide CADD applications. ADOT is currently interested in the feasibil...
Canton hydroelectric project: feasibility study. Final report, appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-05-01
These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
NASA Astrophysics Data System (ADS)
Sun, Chao; Zhang, Chunran; Gu, Xinfeng; Liu, Bin
2017-10-01
Constraints of the optimization objective are often unable to be met when predictive control is applied to industrial production process. Then, online predictive controller will not find a feasible solution or a global optimal solution. To solve this problem, based on Back Propagation-Auto Regressive with exogenous inputs (BP-ARX) combined control model, nonlinear programming method is used to discuss the feasibility of constrained predictive control, feasibility decision theorem of the optimization objective is proposed, and the solution method of soft constraint slack variables is given when the optimization objective is not feasible. Based on this, for the interval control requirements of the controlled variables, the slack variables that have been solved are introduced, the adaptive weighted interval predictive control algorithm is proposed, achieving adaptive regulation of the optimization objective and automatically adjust of the infeasible interval range, expanding the scope of the feasible region, and ensuring the feasibility of the interval optimization objective. Finally, feasibility and effectiveness of the algorithm is validated through the simulation comparative experiments.
Ribisl, Kurt M; Fernandez, Maria E; Friedman, Daniela B; Hannon, Peggy A; Leeman, Jennifer; Moore, Alexis; Olson, Lindsay; Ory, Marcia; Risendal, Betsy; Sheble, Laura; Taylor, Vicky M; Williams, Rebecca S; Weiner, Bryan J
2017-03-01
The Cancer Prevention and Control Research Network (CPCRN) is a thematic network dedicated to accelerating the adoption of evidence-based cancer prevention and control practices in communities by advancing dissemination and implementation science. Funded by the Centers for Disease Control and Prevention and National Cancer Institute, CPCRN has operated at two levels: Each participating network center conducts research projects with primarily local partners as well as multicenter collaborative research projects with state and national partners. Through multicenter collaboration, thematic networks leverage the expertise, resources, and partnerships of participating centers to conduct research projects collectively that might not be feasible individually. Although multicenter collaboration is often advocated, it is challenging to promote and assess. Using bibliometric network analysis and other graphical methods, this paper describes CPCRN's multicenter publication progression from 2004 to 2014. Searching PubMed, Scopus, and Web of Science in 2014 identified 249 peer-reviewed CPCRN publications involving two or more centers out of 6,534 total. The research and public health impact of these multicenter collaborative projects initiated by CPCRN during that 10-year period were then examined. CPCRN established numerous workgroups around topics such as: 2-1-1, training and technical assistance, colorectal cancer control, federally qualified health centers, cancer survivorship, and human papillomavirus. This paper discusses the challenges that arise in promoting multicenter collaboration and the strategies that CPCRN uses to address those challenges. The lessons learned should broadly interest those seeking to promote multisite collaboration to address public health problems, such as cancer prevention and control. Copyright © 2016 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.
Hidalgo-Mazzei, Diego; Mateu, Ainoa; Reinares, María; Undurraga, Juan; Bonnín, Caterina del Mar; Sánchez-Moreno, José; Vieta, Eduard; Colom, Francesc
2015-03-20
New technologies have recently been used for monitoring signs and symptoms of mental health illnesses and particularly have been tested to improve the outcomes in bipolar disorders. Web-based psychoeducational programs for bipolar disorders have also been implemented, yet to our knowledge, none of them have integrated both approaches in one single intervention. The aim of this project is to develop and validate a smartphone application to monitor symptoms and signs and empower the self-management of bipolar disorder, offering customized embedded psychoeducation contents, in order to identify early symptoms and prevent relapses and hospitalizations. The project will be carried out in three complementary phases, which will include a feasibility study (first phase), a qualitative study (second phase) and a randomized controlled trial (third phase) comparing the smartphone application (SIMPLe) on top of treatment as usual with treatment as usual alone. During the first phase, feasibility and satisfaction will be assessed with the application usage log data and with an electronic survey. Focus groups will be conducted and technical improvements will be incorporated at the second phase. Finally, at the third phase, survival analysis with multivariate data analysis will be performed and relationships between socio-demographic, clinical variables and assessments scores with relapses in each group will be explored. This project could result in a highly available, user-friendly and not costly monitoring and psychoeducational intervention that could improve the outcome of people suffering from bipolar disorders in a practical and secure way. Clinical Trials.gov: NCT02258711 (October 2014).
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... feasibility of the Niagara River Community Hydro Project (Niagara Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...
Evaluation of recycled projects for performance : final report.
DOT National Transportation Integrated Search
1995-04-01
Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...
Low Voltage Electron Beam Processing Final Report CRADA No. TC-645-93-A
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, H.; Wakalopulos, G.
This CRADA project was established to develop a small, inexpensive sealed-tube electron beam processing system having immediate applications in industrial, high speed manufacturing processes, and in the Department of Energy (DOE) waste treatment/cleanup operations. The technical work involved the development and demonstration of a compact, sealed, 50-75 kilovolt (kV) EB generator prototype, including controls and power supply. The specific goals of this project were to develop a low cost vacuum tube capable of shooting an electron beam several inches into the air, and to demonstrate that wide area materials processing is feasible by stacking the tubes to produce continuous beams.more » During the project, we successfully demonstrated the producibility of a low cost electron beam system and several material processing operations of interest to US industry, DOE and, since September 11, 2001, the Homeland Security.« less
The km 3 Mediterranean neutrino observatory - the NEMO.RD project
NASA Astrophysics Data System (ADS)
De Marzo, C. N.
2001-05-01
The NEMO.RD Project is a feasibility study of a km 3 underwater telescope for high energy astrophysical neutrinos to be located in the Mediterranean Sea. Results on various issues of this project are presented on: i) Monte Carlo simulation study of the capabilities of various arrays of phototubes in order to determine the detector geometry that can optimize performance and cost; ii) oceanographic survey of various sites in search of the optimal one; iii) feasibility study of mechanics, deployment, connections and maintenance of such a detector. Parameters of a site near Capo Passero, Sicily, where depth, transparency and other water parameters seem optimal are shown.
Hualapai Tribal Utility Development Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hualapai Tribal Nation
The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central powermore » grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.« less
Promoting excellence in end-of-life care: a report on innovative models of palliative care.
Byock, Ira; Twohig, Jeanne Sheils; Merriman, Melanie; Collins, Karyn
2006-02-01
Promoting Excellence in End-of Life Care, a national program of The Robert Wood Johnson Foundation, funded 22 demonstration projects representing a wide range of health care settings and patient populations to develop innovative models for delivering palliative care that addressed documented deficiencies in the care of patients and families facing the final stage of life. To determine the practicality (feasibility of development and operation as well as acceptance by stakeholders) of new models of care and to determine the impact of the models on access to, quality of and financing for palliative care. The program cannot report scientifically rigorous outcomes, but the grant-funded projects used a variety of methods and measures to assess acceptance of new models and their impact from the perspectives of various stakeholders, including patients and their families, clinicians, administrators and payers. While it is not possible to aggregate data across projects, the data reported to the Promoting Excellence national program office were used to describe program impact with respect to the practicality of palliative care service integration into existing clinical care settings (feasibility and acceptance by stakeholders), the availability and use of palliative care services (access), quality of care (conformance to patient expectations and accepted clinical standards) and costs of care. The 22 projects provided services in urban as well as rural settings, in integrated health systems, hospitals, outpatient clinics, cancer centers, nursing homes, renal dialysis clinics, inner city public health and safety net systems and prisons. Populations served included prison inmates, military veterans, renal dialysis patients, Native Americans, Native Alaskans, and African American patients, inner-city medically underserved patients, pediatric patients, and persons with serious mental illness patients. Hosting or adopting institutions sustained or expanded twenty of the 22 models, and feedback from all stakeholders was positive. Project sites developed and utilized new palliative care services and addressed quality through implementation of new standards and clinical protocols. Costs of care, where they could be assessed, were unaffected or decreased for project patients versus historical or concurrent controls. The 22 Promoting Excellence in End-of Life Care projects demonstrated that by individualizing patient and family assessment, effectively employing existing resources and aligning services with specific patient and family needs, it is possible to expand access to palliative services and improve quality of care in ways that are financially feasible and acceptable to patients, families, clinicians, administrators, and payers.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13801-000] Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in...
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (including costs of an initial feasibility study), consulting fees, costs of preliminary financial... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2010 CFR
2010-04-01
... INFRASTRUCTURE MANAGEMENT PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING § 505.13 Federal Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... 23 Highways 1 2010-04-01 2010-04-01 false Federal Government's share of project cost. 505.13...
24 CFR 27.20 - Conditions of foreclosure sale.
Code of Federal Regulations, 2011 CFR
2011-04-01
... probable causes of project failure resulting in its default; (2) A financial analysis of the project... analysis of the project, including the condition of the structure and grounds, the need for rehabilitation... financial feasibility of the project after foreclosure and sale subject to the terms to be required by the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... to study the feasibility of the proposed San Onofre OWEG Electricity Farm Project (project). The proposed project would utilize 11,443 Ocean Wave Electricity Generation (OWEG) units, an experimental... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13679-000] JD Products, LLC...
Mapping tobacco industry strategies in South East Asia for action planning and surveillance
Stillman, F; Hoang, M; Linton, R; Ritthiphakdee, B; Trochim, W
2008-01-01
Objective: To develop a comprehensive conceptual framework of tobacco industry tactics in four countries in South East Asia for the purpose of: (1) generating consensus on key areas of importance and feasibility for regional and cross country tobacco industry monitoring and surveillance; (2) developing measures to track and monitor the effects of the tobacco industry and to design counterstrategies; and (3) building capacity to improve tobacco control planning in the participating countries. Design: A structured conceptualisation methodology known as concept mapping was used. The process included brainstorming, sorting and rating of statements describing industry activities. Statistical analyses used multidimensional scaling and cluster analysis. Interpretation of the maps was participatory, using regional tobacco control researchers, practitioners, and policy makers during a face to face meeting. Participants: 31 participants in this study come from the four countries represented in the project along with six people from the Johns Hopkins Blomberg School of Public Health. Conclusions: The map shows eight clusters of industry activities within the four countries. These were arranged into four general sectors: economics, politics, public relations and deception. For project design purposes, the map indicates areas of importance and feasibility for monitoring tobacco industry activities and serves as a basis for an initial discussion about action planning. Furthermore, the development of the map used a consensus building process across different stakeholders or stakeholder agencies and is critical when developing regional, cross border strategies for tracking and surveillance. PMID:18218787
Investigation of the use and feasibility of speed warning systems.
DOT National Transportation Integrated Search
2014-05-01
This report summarizes a feasibility evaluation of a speed monitoring system that provided speed warning feedback to drivers enrolled in a voluntary program, with particular emphasis on at-risk drivers, especially chronic speeders. This project inclu...
DOT National Transportation Integrated Search
2010-08-01
Radio frequency identification device (RFID) technology provides the capability to store a unique identification : number and some basic attribute information, which can be retrieved wirelessly. This research project studied : the feasibility of usin...
Assessing the feasibility of using TRANSIMS in North Carolina : The Fayetteville - Fort Bragg case.
DOT National Transportation Integrated Search
2000-08-01
This project assesses the feasibility implementing TRANSIMS to accomplish regional transportation modeling in North Carolina. The report summarizes TRANSIMS technology, its data and resource requirements, and typical output results. To gauge TRANSIMS...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-08-01
Significant accomplishments in fabricating cermaic components for the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), and Department of Defense (DOD) advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. However, additional research is needed in materials and processing development, design methodology, and data base and life prediction. An assessment of needs was completed, and a five-year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotivemore » heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... feasibility of the Palo Verde Diversion Dam Hydroelectric Project (Palo Verde Diversion Dam Project or project... Southern California Edison transmission line located approximately one mile west of the Palo Verde Dam. An...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... feasibility of the Niagara River Community Hydro Project 2 (Niagara 2 Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Lessons Learned from Twelve Years of Partnered Tobacco Cessation Research in the Dominican Republic
Ossip, Deborah J.; Diaz, Sergio; Quiñones, Zahira; McIntosh, Scott; Dozier, Ann; Chin, Nancy; Weber, Emily; Holderness, Heather; Torres, Essie; Bautista, Arisleyda; Sanchez, Jose Javier; Avendaño, Esteban; De Ver Dye, Timothy; McDonald, Paul; Bianco, Eduardo
2017-01-01
Engaging partners for tobacco control within low and middle income countries (LMICs) at early stages of tobacco control presents both challenges and opportunities in the global effort to avert the one billion premature tobacco caused deaths projected for this century. The Dominican Republic (DR) is one such early stage country. The current paper reports on lessons learned from 12 years of partnered United States (US)-DR tobacco cessation research conducted through two NIH trials (Proyecto Doble T, PDT1 and 2). The projects began with a grassroots approach of working with interested communities to develop and test interventions for cessation and secondhand smoke reduction that could benefit the communities, while concurrently building local capacity and providing resources, data, and models of implementation that could be used to ripple upward to expand partnerships and tobacco intervention efforts nationally. Lessons learned are discussed in four key areas: partnering for research, logistical issues in setting up the research project, disseminating and national networking, and mentoring. Effectively addressing the global tobacco epidemic will require sustained focus on supporting LMIC infrastructures for tobacco control, drawing on lessons learned across partnered trials such as those reported here, to provide feasible and innovative approaches for addressing this modifiable public health crisis. PMID:29104673
Lessons Learned from Twelve Years of Partnered Tobacco Cessation Research in the Dominican Republic.
Ossip, Deborah J; Diaz, Sergio; Quiñones, Zahira; McIntosh, Scott; Dozier, Ann; Chin, Nancy; Weber, Emily; Holderness, Heather; Torres, Essie; Bautista, Arisleyda; Sanchez, Jose Javier; Avendaño, Esteban; De Ver Dye, Timothy; McDonald, Paul; Bianco, Eduardo
2016-06-01
Engaging partners for tobacco control within low and middle income countries (LMICs) at early stages of tobacco control presents both challenges and opportunities in the global effort to avert the one billion premature tobacco caused deaths projected for this century. The Dominican Republic (DR) is one such early stage country. The current paper reports on lessons learned from 12 years of partnered United States (US)-DR tobacco cessation research conducted through two NIH trials (Proyecto Doble T, PDT1 and 2). The projects began with a grassroots approach of working with interested communities to develop and test interventions for cessation and secondhand smoke reduction that could benefit the communities, while concurrently building local capacity and providing resources, data, and models of implementation that could be used to ripple upward to expand partnerships and tobacco intervention efforts nationally. Lessons learned are discussed in four key areas: partnering for research, logistical issues in setting up the research project, disseminating and national networking, and mentoring. Effectively addressing the global tobacco epidemic will require sustained focus on supporting LMIC infrastructures for tobacco control, drawing on lessons learned across partnered trials such as those reported here, to provide feasible and innovative approaches for addressing this modifiable public health crisis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the Federal project for the purpose of benefit-to-cost analysis, as well as subsequent cost... not adversely affect the project's economic feasibility. It provides local sponsors more flexibility...
Feasibility Studies for a Mediterranean Neutrino Observatory - The NEMO.RD Project
NASA Astrophysics Data System (ADS)
de Marzo, C.; Ambriola, M.; Bellotti, R.; Cafagna, F.; Calicchio, M.; Ciacio, F.; Circella, M.; de Marzo, C.; Montaruli, T.; Falchieri, D.; Gabrielli, A.; Gandolfi, E.; Masetti, M.; Vitullo, C.; Zanarini, G.; Habel, R.; Usai, I.; Aiello, S.; Burrafato, G.; Caponetto, L.; Costanzo, E.; Lopresti, D.; Pappalardo, L.; Petta, C.; Randazzo, N.; Russo, G. V.; Troia, O.; Barnà, R.; D'Amico, V.; de Domenico, E.; de Pasquale, D.; Giacobbe, S.; Italiano, A.; Migliardo, F.; Salvato, G.; Trafirò, A.; Trimarchi, M.; Ameli, F.; Bonori, M.; Bottai, S.; Capone, A.; Desiati, P.; Massa, F.; Masullo, R.; Salusti, E.; Vicini, M.; Coniglione, R.; Migneco, E.; Piattelli, P.; Riccobene, R.; Sapienza, P.; Cordelli, M.; Trasatti, L.; Valente, V.; de Marchis, G.; Piccari, L.; Accerboni, E.; Mosetti, R.; Astraldi, M.; Gasparini, G. P.; Ulzega, A.; Orrù, P.
2000-06-01
The NEMO.RD Project is a feasibility study of a km3 underwater telescope for high energy astrophysical neutrinos to be located in the Mediterranea Sea. At present this study concerns: i) Monte Carlo simulation study of the capabilities of various arrays of phototubes in order to determine the detector geometry that can optimize performance and cost; ii) design of low power consumption electronic cards for data acquisition and transmission to shore; iii) feasibility study of mechanics, deployment, connection and maintenance of such a detector in collaboration with petrol industries having experience of undersea operations; iv) oceanographic exploration of various sites in search for the optimal one. A brief report on the status of points i) and iv) is presented here
Bousquet, J; Tanasescu, C C; Camuzat, T; Anto, J M; Blasi, F; Neou, A; Palkonen, S; Papadopoulos, N G; Antunes, J P; Samolinski, B; Yiallouros, P; Zuberbier, T
2013-01-01
A debate at the European Union Parliament was held on 13 November 2012 on the Impact of early diagnosis and control of chronic respiratory diseases on Active and Healthy Ageing (AHA). The debate was held under the auspices of the Cyprus Presidency of the European Union (2012) and represents a follow-up of the priorities of the Polish Presidency of the European Union (2011). It highlighted the importance of early life events on the occurrence of chronic respiratory diseases later in life and their impact on active and healthy ageing. Epidemiologic evidence was followed by actions that should be taken to prevent and manage chronic respiratory diseases in children. The debate ended by practical, feasible and achievable projects, demonstrating the strength of the political action in the field. Three projects will be initiated from this debate: The first will be a meeting sponsored by the Région Languedoc-Roussillon on the developmental origins of chronic diseases and ageing: from research to policies and value creation. The second project is being led by the WHO Collaborating Centre for Asthma and Rhinitis: Prevention of Asthma, Prevention of Allergy (PAPA). The third project is the GA(2)LEN sentinel network. © 2013 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.
7 CFR 1744.55 - Application procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... under applicable state law to undertake the project; (3) Engineering and pertinent studies related to the projects or purposes to be financed, when applicable; (4) Feasibility studies with pro forma...
7 CFR 1744.55 - Application procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... under applicable state law to undertake the project; (3) Engineering and pertinent studies related to the projects or purposes to be financed, when applicable; (4) Feasibility studies with pro forma...
AgSTAR Market Opportunities Report
Assesses the market potential for biogas energy projects at swine and dairy farms in the United States and characterizes the sizes and types of operations where biogas projects are technically feasible.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M.; Hadjerioua, Boualem; Martinez, Rocio
The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment,more » and may offer a path to reducing the project development cycle from inception to commissioning.« less
Ethical, legal and social aspects of the approach in Sudan.
El Sayed, Badria B; Malcolm, Colin A; Babiker, Ahmed; Malik, Elfatih M; El Tayeb, Mohammed A H; Saeed, Nageeb S; Nugud, Abdel Hameed D; Knols, Bart G J
2009-11-16
The global malaria situation, especially in Africa, and the problems frequently encountered in chemical control of vectors such as insecticide resistance, emphasize the urgency of research, development and implementation of new vector control technologies that are applicable at regional and local levels. The successful application of the sterile insect technique (SIT) for the control of the New World screwworm Cochliomyia hominivorax and several species of fruit flies has given impetus to the use of this method for suppression or elimination of malaria vectors in some areas of Africa including Northern State of Sudan. The research and development phase of the Northern State feasibility study has been started. Sudanese stakeholders are working side-by-side with the International Atomic Energy Agency in the activities of this important phase. Several ethical, legal and social issues associated with this approach arose during this phase of the project. They need to be seriously considered and handled with care. In this paper, these issues are described, and the current and proposed activities to overcome potential hurdles to ensure success of the project are listed.
Transit Feasibility Study Guilford Courthouse National Military Park.
DOT National Transportation Integrated Search
2009-02-28
This study is intended to be a broad overview of the transit feasibility at Guilford Courthouse NMP. The study will discuss the project background and context, and outline the two options for transit service. A detailed evaluation of costs and benefi...
FEASIBILITY STUDY ON EXECUTIVE PROGRAM DEVELOPMENT FOR BASIN ECOSYSTEMS MODELING
The project was undertaken in order to provide a feasibility study in developing and implementing a complete executive program to interface automatically various basin-wide water quality models for use by relatively inexperienced modelers. This executive program should ultimately...
Development of Hydrogen Education Programs for Government Officials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Shannon; Keller, Russ
1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site
7 CFR 1980.442 - Feasibility studies.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management, nature and extent of market area, marketing plans for sale of projected output, extent of... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.442 Feasibility...
DOT National Transportation Integrated Search
1980-01-01
This project was undertaken for the Virginia Department of Transportation Safety to assess the feasibility of implementing the Data Analysis and Reporting Techniques (DART) computer software system in Virginia. Following a review of available literat...
Vessel electrification feasibility study for the New York state canals.
DOT National Transportation Integrated Search
2013-10-01
The objective of this study was to determine the technical and economic feasibility of repowering a diesel-fueled : New York State Canal Corporation (NYSCC) work boat with a diesel hybrid-electric or full-electric powertrain. : The project team instr...
Feasibility trial of a Spanish-language multimedia educational intervention.
Wells, Kristen J; McIntyre, Jessica; Gonzalez, Luis E; Lee, Ji-Hyun; Fisher, Kate J; Jacobsen, Paul B; Meade, Cathy; Muñoz-Antonia, Teresita; Quinn, Gwendolyn P
2013-10-01
Hispanic cancer patients are underrepresented in clinical trials; research suggests lack of knowledge and language barriers contribute to low accrual. Multimedia materials offer advantages to Hispanic populations because they have high acceptability, are easy to disseminate, and can be viewed with family. Hispanic cancer patients and caregivers participated in focus groups to aid in developing a Spanish-language multimedia intervention to educate Hispanic cancer patients about clinical trials. We explored the feasibility of delivering the intervention in medical oncology clinics. A total of 35 patients were randomized to either the multimedia intervention group (n = 18) or a control group (n = 17) who were asked to read the National Cancer Institute's Spanish-language clinical trials brochure. Self-reported data on knowledge about and attitudes toward clinical trials, self-efficacy for participating in a clinical trial, intention to participate in a clinical trial if asked, and receptivity to information about a clinical trial were collected at baseline and 10 days later. Delivery of the multimedia presentation in oncology clinics was feasible. The intervention group had more knowledge about clinical trials at follow-up than the control group; scores for intention to participate in a clinical trial by participants in the intervention group increased from 3.8 to 4.0 of a possible 5, but declined in the control group from 4.5 to 4.1. No statistically significant difference was detected between groups in scores for attitudes or self-efficacy for making a decision to participate in a clinical trial. Our sample size was inadequate to identify differences between the informational methods. Although all patients were asked about their willingness to participate in a clinical trial, this decision was hypothetical. In addition, the study was conducted with a sample of Spanish-speaking Hispanic cancer patients at a comprehensive cancer center in Florida. Thus, the results may not generalize to other Hispanic populations. In the pilot project, we demonstrated the feasibility of delivering multimedia information to patients in medical oncology clinics. Because delivery in a clinical setting was found to be feasible, a larger study should be conducted to evaluate the efficacy of the multimedia intervention with respect to promoting accrual of Hispanic patients to clinical trials.
Smith, Nathan Grant; Hart, Trevor A; Kidwai, Ammaar; Vernon, Julia R G; Blais, Martin; Adam, Barry
2017-09-01
Project PRIDE (Promoting Resilience In Discriminatory Environments) is an 8-session small group intervention aimed at reducing negative mental and behavioral health outcomes resulting from minority stress. This study reports the results of a one-armed pilot test of Project PRIDE, which aimed to examine the feasibility and potential for efficacy of the intervention in a sample of 33 gay and bisexual men aged 18 to 25. The intervention appeared feasible to administer in two different sites and all participants who completed posttreatment (n = 22) or follow-up (n = 19) assessments reported high satisfaction with the intervention. Small to large effect sizes were observed for increases in self-esteem; small effect sizes were found for decreases in loneliness and decreases in minority stress variables; and small and medium effect sizes were found for reductions in alcohol use and number of sex partners, respectively. Overall, Project PRIDE appears to be a feasible intervention with promise of efficacy. Copyright © 2017. Published by Elsevier Ltd.
Jóhannesson, Ómar I.; Balan, Oana; Unnthorsson, Runar; Moldoveanu, Alin; Kristjánsson, Árni
2016-01-01
The Sound of Vision project involves developing a sensory substitution device that is aimed at creating and conveying a rich auditory representation of the surrounding environment to the visually impaired. However, the feasibility of such an approach is strongly constrained by neural flexibility, possibilities of sensory substitution and adaptation to changed sensory input. We review evidence for such flexibility from various perspectives. We discuss neuroplasticity of the adult brain with an emphasis on functional changes in the visually impaired compared to sighted people. We discuss effects of adaptation on brain activity, in particular short-term and long-term effects of repeated exposure to particular stimuli. We then discuss evidence for sensory substitution such as Sound of Vision involves, while finally discussing evidence for adaptation to changes in the auditory environment. We conclude that sensory substitution enterprises such as Sound of Vision are quite feasible in light of the available evidence, which is encouraging regarding such projects. PMID:27355966
Duke Engineering explores huge African Power Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, P.
1994-10-14
Duke Engineering & Services and the African Republic of Uganda have entered into a memorandum of understanding to explore the feasibility of installing one or more hydropower plants along the Nile River and building a 2,000 mile transmission line through southern Africa. The project`s participants say they envision a southern African electricity grid connecting all countries in the region. A team comprised of officials from DE&S, Edlow and SAD-ELEC will conduct a six-month, two-part study on the feasibility of linking the existing grid system in the region. The first part of the study will look at the feasibility of installingmore » one or more independent hydropower plants along the Nile and other rivers in Uganda. The second part will explore the design, construction and operation of a transmission system to interconnect Uganda, through neighboring countries to the south and east, to the Republic of South Africa. The site for the proposed hydroelectric plant will determine the route of the transmission line.« less
NASA Astrophysics Data System (ADS)
Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng
2017-06-01
Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.
34 CFR 1100.21 - What selection criteria does the Director use to rate an applicant?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Education (Continued) NATIONAL INSTITUTE FOR LITERACY NATIONAL INSTITUTE FOR LITERACY: LITERACY LEADER... to the literacy field. (2) The design of the project is strong and feasible. (3) The project... effectiveness of the project. (7) The project results are likely to contribute to the knowledge base in literacy...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14065-000] Amnor Hydro West... Act (FPA), proposing to study the feasibility of the Clear Creek Dam Hydropower Project (project) to...' express permission. The proposed project would utilize the existing outlet works of the U.S. Bureau of...
34 CFR 1100.21 - What selection criteria does the Director use to rate an applicant?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Education (Continued) NATIONAL INSTITUTE FOR LITERACY NATIONAL INSTITUTE FOR LITERACY: LITERACY LEADER... to the literacy field. (2) The design of the project is strong and feasible. (3) The project... effectiveness of the project. (7) The project results are likely to contribute to the knowledge base in literacy...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dalverny, L.E.; Chaiken, R.F.; Soroka, K.E.
1984-01-01
This report is the third in a five-part series that describes the Calamity Hollow Mine Fire Project. The first report, part 1, describes the design and construction of the field installation. Part 2 will present the results of a continuous 4-month burnout operation. (Because part 2 involves the analysis of a substantial body of data, it will not be published until after publication of parts 3, 4, and 5.) This part (part 3) describes the instrumentation used to control and monitor the progress of the burnout operation. Parts 4 and 5 both deal with the closeout phase of the fieldmore » demonstration. Part 4 describes the procedure used to quench the fire, and part 5 will describe the final excavation and backfilling of the heated zones. The reports in this series document the Calamity Hollow controlled burnout demonstration which showed that (1) controlled in situ combustion is a feasible method for controlling underground fires in abandoned mines, (2) the resultant thermal exhaust output is sufficient for energy utilization, and (3) water injection with fume exhaustion (WIFE) is a potentially effective method for cooling large underground fire zones. Further trials of both Burnout Control and the WIFE quenching procedure are planned.« less
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
Simpson, Sharon A; McNamara, Rachel; Shaw, Christine; Kelson, Mark; Moriarty, Yvonne; Randell, Elizabeth; Cohen, David; Alam, M Fasihul; Copeland, Lauren; Duncan, Donna; Espinasse, Aude; Gillespie, David; Hill, Andy; Owen-Jones, Eleri; Tapper, Katy; Townson, Julia; Williams, Simon; Hood, Kerry
2015-07-01
Obesity has significant health and NHS cost implications. Relatively small reductions in weight have clinically important benefits, but long-term weight loss maintenance (WLM) is challenging. Behaviour change interventions have been identified as key for WLM. Motivation is crucial to supporting behaviour change, and motivational interviewing (MI) has been identified as a successful approach to changing health behaviours. The study was designed as an adequately powered, pragmatic randomised controlled trial (RCT); however, owing to recruitment issues, the study became a feasibility trial. To assess recruitment, retention, feasibility, acceptability, compliance and delivery of a 12-month intervention to support WLM. Secondary objectives were to assess the impact of the intervention on body mass index (BMI) and other secondary outcomes. Three-arm individually randomised controlled trial comprising an intensive arm, a less intensive arm and a control arm. Community setting in South Wales and the East Midlands. Individuals aged 18-70 years with a current or previous BMI of ≥ 30 kg/m(2) who could provide evidence of at least 5% weight loss during the previous 12 months. Participants received individually tailored MI, which included planning and self-monitoring. The intensive arm received six face-to-face sessions followed by nine telephone sessions. The less intensive arm received two face-to-face sessions followed by two telephone sessions. The control arm received a leaflet advising them on healthy lifestyle. Feasibility outcomes included numbers recruited, retention and adherence. The primary effectiveness outcome was BMI at 12 months post randomisation. Secondary outcomes included waist circumference, waist-to-hip ratio, physical activity, proportion maintaining weight loss, diet, quality of life, health service resource usage, binge eating and well-being. A process evaluation assessed intervention delivery, adherence, and participants' and practitioners' views. Economic analysis aimed to assess cost-effectiveness in terms of quality-adjusted life-years (QALYs). A total of 170 participants were randomised. Retention was good (84%) and adherence was excellent (intensive, 83%; less intensive, 91%). The between-group difference in mean BMI indicated the intensive arm had BMIs 1.0 kg/m(2) lower than the controls [95% confidence interval (CI) -2.2 kg/m(2) to 0.2 kg/m(2)]. Similarly, a potential difference was found in weight (average difference of 2.8 kg, 95% CI -6.1 kg to 0.5 kg). The intensive arm had odds of maintaining on average 43% [odds ratio(OR) 1.4, 95% CI 0.6 to 3.5] higher than controls. None of these findings were statistically significant. Further analyses controlling for level of adherence indicated that average BMI was 1.2 kg/m(2) lower in the intensive arm than the control arm (95% CI -2.5 kg/m(2) to 0.0 kg/m(2)). The intensive intervention led to a statistically significant difference in weight (mean -3.7 kg, 95% CI -7.1 kg to -0.3 kg). The other secondary outcomes showed limited evidence of differences between groups. The intervention was delivered as planned, and both practitioners and participants were positive about the intervention and its impact. Although not powered to assess cost-effectiveness, results of this feasibility study suggest that neither intervention as currently delivered is likely to be cost-effective in routine practice. This is the first trial of an intervention for WLM in the UK, the intervention is feasible and acceptable, and retention and adherence were high. The main effectiveness outcome showed a promising mean difference in the intensive arm. Owing to the small sample size, we are limited in the conclusions we can draw. However, findings suggest that the intensive intervention may facilitate long-term weight maintenance and, therefore, further testing in an effectiveness trial may be indicated. Research examining WLM is in its infancy, further research is needed to develop our understanding of WLM and to expand theory to inform the development of interventions to be tested in rigorously designed RCTs with cost-effectiveness assessed. Current Controlled Trials ISRCTN35774128. This project was funded by the National Institute for Health Research Health Technology Assessment programme and will be published in full in Health Technology Assessment; Vol. 19, No. 50. See the NIHR Journals Library website for further project information.
NASA Astrophysics Data System (ADS)
1981-07-01
The findings of a feasibility study performed for Basin View Heating District in Klamath Falls, Oregon are reported. The physical, economic, and political feasibility of establishing a geothermal heating district to provide space heat to housing units in the Basin View Development of Klamath Falls are determined. Of the several systems considered, all are physically feasible. The project is politically feasible if the owner complies with governmental requirements. Economic feasibility is based on considerations of money value rates, tax rates and expected rates of return, which are dependent on government and money markets. For analysis a money value rate of 21% and an owner's marginal tax rate of 35% were adopted.
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
NASA Technical Reports Server (NTRS)
Kirk, J. A.; Studer, P. A.; Evans, H. E.
1976-01-01
A new energy storage system (the mechanical capacitor), using a spokeless magnetically levitated composite ring rotor, is described and design formulas for sizing the components are presented. This new system is configured around a permanent magnet (flux biased) suspension which has active servo control in the radial direction and passive control in the axial direction. The storage ring is used as a moving rotor and electronic commutation of the stationary armature coils is proposed. There is no mechanical contact with the rotating spokeless ring; therefore, long life and near zero rundown losses are projected. A 7-kW h system is sized to demonstrate feasibility. A literature review of flywheel energy storage systems is also presented and general formulas are developed for comparing rotor geometries.
Usage of Fault Detection Isolation & Recovery (FDIR) in Constellation (CxP) Launch Operations
NASA Technical Reports Server (NTRS)
Ferrell, Rob; Lewis, Mark; Perotti, Jose; Oostdyk, Rebecca; Spirkovska, Lilly; Hall, David; Brown, Barbara
2010-01-01
This paper will explore the usage of Fault Detection Isolation & Recovery (FDIR) in the Constellation Exploration Program (CxP), in particular Launch Operations at Kennedy Space Center (KSC). NASA's Exploration Technology Development Program (ETDP) is currently funding a project that is developing a prototype FDIR to demonstrate the feasibility of incorporating FDIR into the CxP Ground Operations Launch Control System (LCS). An architecture that supports multiple FDIR tools has been formulated that will support integration into the CxP Ground Operation's Launch Control System (LCS). In addition, tools have been selected that provide fault detection, fault isolation, and anomaly detection along with integration between Flight and Ground elements.
[Telescience : Feasibility studies, definition and a fair answer to the scientific brain drain].
Craemer, E M; Bassa, B; Jacobi, C; Becher, H; Meyding-Lamadé, U
2017-02-01
What is telescience? Is it feasible to transfer academic information with the help of telematics to educate and teach young scientists over large distances? The term telescience has so far not been defined but covers a variety of possibilities, which could be successfully implemented worldwide. This article gives examples and highlights the feasibility analysis of telescience. We have carried out feasibility analyses for neurological functional diagnostics, an epidemiological cross-sectional study as well as a laboratory study for detection of thrombocyte function during dengue fever with the help of telemedicine. The basis for all these projects was a telemedical transcontinental cooperation over a distance of 12,000 km. All performed studies demonstrated the feasibility. With the help of telematics the laboratory techniques, planning, conduction and interpretation of results as well as publication skills can be transferred. Telescience is feasible. Our studies showed that telescience is a very promising option to transfer knowledge, which will help to enable professional expertise to be transferred directly to the region/country without a brain drain. All too often young motivated scientists are enticed to move to well-known institutions, which involves the danger of a brain drain. Brain drain can be avoided in favor of local implementation of scientific projects. Our results illustrate that it is feasible to educate and guide scientists with the help of telematics infrastructures.
DOT National Transportation Integrated Search
2014-04-01
This project explored the feasibility of using Unmanned Aerial Systems (UASs) in Georgia : Department of Transportation (GDOT) operations. The research team conducted 24 interviews with : personnel in four GDOT divisions. Interviews focused on (1) th...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
Final contract report : real-time EMS helicopter video feasibility study
DOT National Transportation Integrated Search
2001-11-01
The purpose of this project was to determine whether the use of ground-based video imaging by local rescue squad personnel and Pegasus medical staff is technically and organizationally feasible as a tool to improve pre-hospital care provided to crash...
Final Report - Wind and Hydro Energy Feasibility Study - June 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jim Zoellick; Richard Engel; Rubin Garcia
2011-06-17
This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.
BIOMASS REBURNING - MODELING/ENGINEERING STUDIES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vladimir Zamansky; Chris Lindsey; Vitali Lissianski
This project is designed to develop engineering and modeling tools for a family of NO{sub x} control technologies utilizing biomass as a reburning fuel. During the ninth reporting period (September 27--December 31, 1999), EER prepared a paper Kinetic Model of Biomass Reburning and submitted it for publication and presentation at the 28th Symposium (International) on Combustion, University of Edinburgh, Scotland, July 30--August 4, 2000. Antares Group Inc, under contract to Niagara Mohawk Power Corporation, evaluated the economic feasibility of biomass reburning options for Dunkirk Station. A preliminary report is included in this quarterly report.
Load Bearing Equipment for Bone and Muscle Project
NASA Technical Reports Server (NTRS)
Terrier, Douglas; Clayton, Ronald G.; Shackelford, Linda
2015-01-01
Axial skeletal loads coupled with muscle torque forces around joints maintain bone. Astronauts working in pairs to exercise can provide high eccentric loads for each other that are most effective. A prototype of load bearing equipment that will allow astronauts to perform exercises using each other for counter force generation in a controlled fashion and provide eccentric overload is proposed. A frame and attachments that can be rapidly assembled for use and easily stored will demonstrate feasibility of a design that can be adapted for ISS testing and Orion use.
Taylor, Julie Lounds; Hodapp, Robert M.; Burke, Meghan M.; Waitz-Kudla, Sydney N.; Rabideau, Carol
2017-01-01
This study presents findings from a pilot randomized controlled trial, testing a 12-week intervention to train parents of youth with autism spectrum disorder (ASD) to advocate for adult disability services—the Volunteer Advocacy Project-Transition (VAP-T). Participants included 41 parents of youth with ASD within two years of high school exit, randomly assigned to a treatment (N = 20) or wait-list control (N = 21) group. Outcomes, collected before and after the intervention, included parental knowledge about adult services, advocacy skills-comfort, and empowerment. The VAP-T had acceptable feasibility, treatment fidelity, and acceptability. After participating in the VAP-T, intervention parents (compared to controls) knew more about the adult service system, were more skilled/comfortable advocating, and felt more empowered. PMID:28070786
Systematic skin cancer screening in Northern Germany.
Breitbart, Eckhard W; Waldmann, Annika; Nolte, Sandra; Capellaro, Marcus; Greinert, Ruediger; Volkmer, Beate; Katalinic, Alexander
2012-02-01
The incidence of skin cancer is increasing worldwide. For decades, opportunistic melanoma screening has been carried out to respond to this burden. However, despite potential positive effects such as reduced morbidity and mortality, there is still a lack of evidence for feasibility and effectiveness of organized skin cancer screening. The main aim of the project was to evaluate the feasibility of systematic skin cancer screening. In 2003, the Association of Dermatological Prevention was contracted to implement the population-based SCREEN project (Skin Cancer Research to Provide Evidence for Effectiveness of Screening in Northern Germany) in the German state of Schleswig-Holstein. A two-step program addressing malignant melanoma and nonmelanocytic skin cancer was implemented. Citizens (aged ≥ 20 years) with statutory health insurance were eligible for a standardized whole-body examination during the 12-month study period. Cancer registry and mortality data were used to assess first effects. Of 1.88 million eligible citizens, 360,288 participated in SCREEN. The overall population-based participation rate was 19%. A total of 3103 malignant skin tumors were found. On the population level, invasive melanoma incidence increased by 34% during SCREEN. Five years after SCREEN a substantial decrease in melanoma mortality was seen (men: observed 0.79/100,000 and expected 2.00/100,000; women: observed 0.66/100,000 and expected 1.30/100,000). Because of political reasons (resistance as well as lack of support from major German health care stakeholders), it was not possible to conduct a randomized controlled trial. The project showed that large-scale systematic skin cancer screening is feasible and has the potential to reduce skin cancer burden, including mortality. Based on the results of SCREEN, a national statutory skin cancer early detection program was implemented in Germany in 2008. Copyright © 2010 American Academy of Dermatology, Inc. Published by Mosby, Inc. All rights reserved.
Enhanced Automated Guidance System for Horizontal Auger Boring Based on Image Processing
Wu, Lingling; Wen, Guojun; Wang, Yudan; Huang, Lei; Zhou, Jiang
2018-01-01
Horizontal auger boring (HAB) is a widely used trenchless technology for the high-accuracy installation of gravity or pressure pipelines on line and grade. Differing from other pipeline installations, HAB requires a more precise and automated guidance system for use in a practical project. This paper proposes an economic and enhanced automated optical guidance system, based on optimization research of light-emitting diode (LED) light target and five automated image processing bore-path deviation algorithms. An LED target was optimized for many qualities, including light color, filter plate color, luminous intensity, and LED layout. The image preprocessing algorithm, feature extraction algorithm, angle measurement algorithm, deflection detection algorithm, and auto-focus algorithm, compiled in MATLAB, are used to automate image processing for deflection computing and judging. After multiple indoor experiments, this guidance system is applied in a project of hot water pipeline installation, with accuracy controlled within 2 mm in 48-m distance, providing accurate line and grade controls and verifying the feasibility and reliability of the guidance system. PMID:29462855
Enhanced Automated Guidance System for Horizontal Auger Boring Based on Image Processing.
Wu, Lingling; Wen, Guojun; Wang, Yudan; Huang, Lei; Zhou, Jiang
2018-02-15
Horizontal auger boring (HAB) is a widely used trenchless technology for the high-accuracy installation of gravity or pressure pipelines on line and grade. Differing from other pipeline installations, HAB requires a more precise and automated guidance system for use in a practical project. This paper proposes an economic and enhanced automated optical guidance system, based on optimization research of light-emitting diode (LED) light target and five automated image processing bore-path deviation algorithms. An LED light target was optimized for many qualities, including light color, filter plate color, luminous intensity, and LED layout. The image preprocessing algorithm, direction location algorithm, angle measurement algorithm, deflection detection algorithm, and auto-focus algorithm, compiled in MATLAB, are used to automate image processing for deflection computing and judging. After multiple indoor experiments, this guidance system is applied in a project of hot water pipeline installation, with accuracy controlled within 2 mm in 48-m distance, providing accurate line and grade controls and verifying the feasibility and reliability of the guidance system.
Best practices for budget-based design.
DOT National Transportation Integrated Search
2017-03-01
State Departments of Transportation (State DOTs) encounter difficulties in establishing feasible and : reliable project budget early in the project development. The lack of a systematic process for establishing : baseline budget with the consideratio...
7 CFR 4280.111 - Application and documentation.
Code of Federal Regulations, 2010 CFR
2010-01-01
...: (i) Title. Provide a descriptive title of the project (identified on SF 424). (ii) Applicant... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.111 - Application and documentation.
Code of Federal Regulations, 2011 CFR
2011-01-01
...: (i) Title. Provide a descriptive title of the project (identified on SF 424). (ii) Applicant... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
Expert operator's associate: A knowledge based system for spacecraft control
NASA Technical Reports Server (NTRS)
Nielsen, Mogens; Grue, Klaus; Lecouat, Francois
1991-01-01
The Expert Operator's Associate (EOA) project is presented which studies the applicability of expert systems for day-to-day space operations. A prototype expert system is developed, which operates on-line with an existing spacecraft control system at the European Space Operations Centre, and functions as an 'operator's assistant' in controlling satellites. The prototype is demonstrated using an existing real-time simulation model of the MARECS-B2 telecommunication satellite. By developing a prototype system, the extent to which reliability and effectivens of operations can be enhanced by AI based support is examined. In addition the study examines the questions of acquisition and representation of the 'knowledge' for such systems, and the feasibility of 'migration' of some (currently) ground-based functions into future spaceborne autonomous systems.
Feasibility Study: New Knowledge Demands in Turbulent Business World
NASA Astrophysics Data System (ADS)
Sprice, Renate; Kirikova, Marite
Feasibility study is one of the early activities in information systems (IS) development when important decisions regarding choice among several possible systems development alternatives are to be made. In times of relatively stable business environment and waterfall model as a systems development approach, the role and methods of feasibility study where quite clear (Kendall and Kendall 1995). However, new software development methods and the necessity to develop more rapidly new IS or their parts may. challenge the possibility to evaluate project feasibility in the early stages of IS development.
DOT National Transportation Integrated Search
2006-08-01
The overall purpose of this research project is to conduct a feasibility study and development of a general methodology to determine the impacts on multi-modal and system efficiency of alternative freight security measures. The methodology to be exam...
NASA Technical Reports Server (NTRS)
1979-01-01
The feasibility of Union Carbide's silane process for commercial application was established. An integrated process design for an experimental process system development unit and a commercial facility were developed. The corresponding commercial plant economic performance was then estimated.
24 CFR 241.1010 - Feasibility letter.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... Commissioner's estimate of the supportable loan amount, based upon the project's equity in the case of an equity loan and based on the project's purchase price in the case of an acquisition loan, but such...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... growth projections in the study area, it was determined that the travel demand in the Loop 9 project area would not warrant the project as originally proposed. TxDOT intends to conduct a feasibility study to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
...), proposing to study the feasibility of the DaGuerre Point Dam Hydropower Project (DaGuerre Point Dam Project or project) to be located at the U.S. Army Corps of Engineers' (USACE) DaGuerre Point Dam, on the...
A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terry Battiest
2012-11-30
The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through themore » decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...
Role of Hydrogeology in Professional Environmental Projects
The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.
DOT National Transportation Integrated Search
1999-12-01
This project assessed the feasibility of high-occupancy vehicle (HOV) and high-occupancy vehicle/toll (HOT) facilities. In the first report of this project, current operational facilities were described and guidelines for the operation, design, agenc...
Economic evaluation of environmental epidemiological projects in national industrial complexes.
Shin, Youngchul
2017-01-01
In this economic evaluation of environmental epidemiological monitoring projects, we analyzed the economic feasibility of these projects by determining the social cost and benefit of these projects and conducting a cost/benefit analysis. Here, the social cost was evaluated by converting annual budgets for these research and survey projects into present values. Meanwhile, the societal benefit of these projects was evaluated by using the contingent valuation method to estimate the willingness-to-pay of residents living in or near industrial complexes. In addition, the extent to which these projects reduced negative health effects (i.e., excess disease and premature death) was evaluated through expert surveys, and the analysis was conducted to reflect the unit of economic value, based on the cost of illness and benefit transfer method. The results were then used to calculate the benefit of these projects in terms of the decrease in negative health effects. For residents living near industrial complexes, the benefit/cost ratio was 1.44 in the analysis based on resident surveys and 5.17 in the analysis based on expert surveys. Thus, whichever method was used for the economic analysis, the economic feasibility of these projects was confirmed.
2017-10-01
USER GUIDE 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening-Level Feasibility Assessment and Design Tool in...Support of 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) ESTCP Project ER-201326 OCTOBER 2017 Rob Hinchee Integrated Science...Technology, Inc. 1509 Coastal Highway Panacea, FL 32346 8/8/2013 - 8/8/2018 10-2017 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, J. O.; Mosey, G.
2014-04-01
Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing contaminated lands in the Buffalo, New York, area for utility-scale wind development is explored. The study found that there is available land, electrical infrastructure, wind resource, and local interest to support a commercial wind project; however, economies of scale and local electrical markets may need further investigation before significant investment is made into developing a wind project at the Buffalo Reuse Authority site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Penfold, S; Casiraghi, M; Dou, T
2015-06-15
Purpose: To investigate the applicability of feasibility-seeking cyclic orthogonal projections to the field of intensity modulated proton therapy (IMPT) inverse planning. Feasibility of constraints only, as opposed to optimization of a merit function, is less demanding algorithmically and holds a promise of parallel computations capability with non-cyclic orthogonal projections algorithms such as string-averaging or block-iterative strategies. Methods: A virtual 2D geometry was designed containing a C-shaped planning target volume (PTV) surrounding an organ at risk (OAR). The geometry was pixelized into 1 mm pixels. Four beams containing a subset of proton pencil beams were simulated in Geant4 to provide themore » system matrix A whose elements a-ij correspond to the dose delivered to pixel i by a unit intensity pencil beam j. A cyclic orthogonal projections algorithm was applied with the goal of finding a pencil beam intensity distribution that would meet the following dose requirements: D-OAR < 54 Gy and 57 Gy < D-PTV < 64.2 Gy. The cyclic algorithm was based on the concept of orthogonal projections onto half-spaces according to the Agmon-Motzkin-Schoenberg algorithm, also known as ‘ART for inequalities’. Results: The cyclic orthogonal projections algorithm resulted in less than 5% of the PTV pixels and less than 1% of OAR pixels violating their dose constraints, respectively. Because of the abutting OAR-PTV geometry and the realistic modelling of the pencil beam penumbra, complete satisfaction of the dose objectives was not achieved, although this would be a clinically acceptable plan for a meningioma abutting the brainstem, for example. Conclusion: The cyclic orthogonal projections algorithm was demonstrated to be an effective tool for inverse IMPT planning in the 2D test geometry described. We plan to further develop this linear algorithm to be capable of incorporating dose-volume constraints into the feasibility-seeking algorithm.« less
Mache, Stefanie; Vitzthum, Karin; Klapp, Burghard F; Groneberg, David A
2015-10-01
The present study was designed to gather preliminary information regarding the feasibility of implementing a psychosocial resilience program and to assess if the program would potentially promote protective factors (such as resiliency, self-efficacy) and job satisfaction as well as decreasing perceived stress among a sample of German junior physicians. Eighty-two junior physicians in their first year after graduation took part in the project and were randomized in a controlled trial to either an intervention or a control group for 3 months. The intervention group was offered resilience training combined with cognitive behavioral and solution-focused counseling. Primary outcome measures included scales of the PSQ, BRCS, SWOPE, and COPSOQ. Two post-intervention follow-up measurements proved the effectiveness of the intervention. There was a significant improvement between baseline and follow-up intervention scores on measures of resilience, self-efficacy, optimism, and perceived stress observed in the intervention group compared to the control group. Job satisfaction did not significantly differ between baseline and follow-ups. These results indicate that the program to enhance resilience and decrease stress among physicians is feasible to implement as a group training program in a workplace setting. Further, the intervention provides statistically significant improvement in perceptions of distress and strengthens protective factors (such as resiliency).
The Integrated Virtual Environment Rehabilitation Treadmill System
Feasel, Jeff; Whitton, Mary C.; Kassler, Laura; Brooks, Frederick P.; Lewek, Michael D.
2015-01-01
Slow gait speed and interlimb asymmetry are prevalent in a variety of disorders. Current approaches to locomotor retraining emphasize the need for appropriate feedback during intensive, task-specific practice. This paper describes the design and feasibility testing of the integrated virtual environment rehabilitation treadmill (IVERT) system intended to provide real-time, intuitive feedback regarding gait speed and asymmetry during training. The IVERT system integrates an instrumented, split-belt treadmill with a front-projection, immersive virtual environment. The novel adaptive control system uses only ground reaction force data from the treadmill to continuously update the speeds of the two treadmill belts independently, as well as to control the speed and heading in the virtual environment in real time. Feedback regarding gait asymmetry is presented 1) visually as walking a curved trajectory through the virtual environment and 2) proprioceptively in the form of different belt speeds on the split-belt treadmill. A feasibility study involving five individuals with asymmetric gait found that these individuals could effectively control the speed of locomotion and perceive gait asymmetry during the training session. Although minimal changes in overground gait symmetry were observed immediately following a single training session, further studies should be done to determine the IVERT’s potential as a tool for rehabilitation of asymmetric gait by providing patients with congruent visual and proprioceptive feedback. PMID:21652279
Integrating the Complete Research Project into a Large Qualitative Methods Course
ERIC Educational Resources Information Center
Raddon, Mary-Beth; Nault, Caleb; Scott, Alexis
2008-01-01
Participatory exercises are standard practice in qualitative methods courses; less common are projects that engage students in the entire research process, from research design to write-up. Although the teaching literature provides several models of complete research projects, their feasibility, and appropriateness for large, compulsory,…
Great Basin Native Plant Project: 2015 Progress Report
Francis Kilkenny; Fred Edwards; Alexis Malcomb
2016-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead...
45 CFR 1336.33 - Eligible applicants and proposed activities which are ineligible.
Code of Federal Regulations, 2014 CFR
2014-10-01
... served. (1) Social and Economic Development Strategies (SEDS) and Preservation and Enhancement of Native... 42 U.S.C. 2991b-3) (2) Alaska-Specific Social and Economic Development Strategies (SEDS) Projects: (i... carry out project objectives, is acceptable; (2) Projects that request funds for feasibility studies...
45 CFR 1336.33 - Eligible applicants and proposed activities which are ineligible.
Code of Federal Regulations, 2011 CFR
2011-10-01
... served. (1) Social and Economic Development Strategies (SEDS) and Preservation and Enhancement of Native... 42 U.S.C. 2991b-3) (2) Alaska-Specific Social and Economic Development Strategies (SEDS) Projects: (i... carry out project objectives, is acceptable; (2) Projects that request funds for feasibility studies...
7 CFR 4284.908 - Use of grant and matching funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... carrying out relevant projects. Matching funds must be provided for the balance of costs. (c) Matching..., or hire a qualified consultant to conduct, a feasibility analysis of the proposed value added project to help determine the potential success of the project; (2) Develop, or hire a qualified consultant...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13643-000] Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...
Project Crossroads as Pre-Trial Intervention. A Program Evaluation.
ERIC Educational Resources Information Center
Rovner-Pieczenik, Roberta
This report describes and evaluates Project Crossroads, a manpower approach to the rehabilitation of accused offenders prior to adjudication. In order to demonstrate the feasibility of working with the court and its personnel to provide a pretrial intervention alternative for youthful first-time offenders, Project Crossroads provided a…
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
78 FR 46677 - Environmental Impact Statement; Calcasieu Parish, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... between the I-210 interchanges including the Calcasieu River Bridge. A feasibility and environmental study... project. The feasibility study involved four phases: (1) Information and Data Gathering; (2) Preliminary Study; (3) Refined Alternatives; and (4) Preparation and Submission of a Final Report. Based on the...
Hind, Daniel; Parkin, James; Whitworth, Victoria; Rex, Saleema; Young, Tracey; Hampson, Lisa; Sheehan, Jennie; Maguire, Chin; Cantrill, Hannah; Scott, Elaine; Epps, Heather; Main, Marion; Geary, Michelle; McMurchie, Heather; Pallant, Lindsey; Woods, Daniel; Freeman, Jennifer; Lee, Ellen; Eagle, Michelle; Willis, Tracey; Muntoni, Francesco; Baxter, Peter
2017-05-01
Duchenne muscular dystrophy (DMD) is a rare disease that causes the progressive loss of motor abilities such as walking. Standard treatment includes physiotherapy. No trial has evaluated whether or not adding aquatic therapy (AT) to land-based therapy (LBT) exercises helps to keep muscles strong and children independent. To assess the feasibility of recruiting boys with DMD to a randomised trial evaluating AT (primary objective) and to collect data from them; to assess how, and how well, the intervention and trial procedures work. Parallel-group, single-blind, randomised pilot trial with nested qualitative research. Six paediatric neuromuscular units. Children with DMD aged 7-16 years, established on corticosteroids, with a North Star Ambulatory Assessment (NSAA) score of 8-34 and able to complete a 10-m walk without aids/assistance. Exclusions: > 20% variation between baseline screens 4 weeks apart and contraindications. Participants were allocated on a 1 : 1 ratio to (1) optimised, manualised LBT (prescribed by specialist neuromuscular physiotherapists) or (2) the same plus manualised AT (30 minutes, twice weekly for 6 months: active assisted and/or passive stretching regime; simulated or real functional activities; submaximal exercise). Semistructured interviews with participants, parents ( n = 8) and professionals ( n = 8) were analysed using Framework analysis. An independent rater reviewed patient records to determine the extent to which treatment was optimised. A cost-impact analysis was performed. Quantitative and qualitative data were mixed using a triangulation exercise. Feasibility of recruiting 40 participants in 6 months, participant and therapist views on the acceptability of the intervention and research protocols, clinical outcomes including NSAA, independent assessment of treatment optimisation and intervention costs. Over 6 months, 348 children were screened - most lived too far from centres or were enrolled in other trials. Twelve (30% of target) were randomised to AT ( n = 8) or control ( n = 4). People in the AT ( n = 8) and control ( n = 2: attrition because of parental report) arms contributed outcome data. The mean change in NSAA score at 6 months was -5.5 [standard deviation (SD) 7.8] for LBT and -2.8 (SD 4.1) in the AT arm. One boy suffered pain and fatigue after AT, which resolved the same day. Physiotherapists and parents valued AT and believed that it should be delivered in community settings. The independent rater considered AT optimised for three out of eight children, with other children given programmes that were too extensive and insufficiently focused. The estimated NHS costs of 6-month service were between £1970 and £2734 per patient. The focus on delivery in hospitals limits generalisability. Neither a full-scale frequentist randomised controlled trial (RCT) recruiting in the UK alone nor a twice-weekly open-ended AT course delivered at tertiary centres is feasible. Further intervention development research is needed to identify how community-based pools can be accessed, and how families can link with each other and community physiotherapists to access tailored AT programmes guided by highly specialised physiotherapists. Bayesian RCTs may be feasible; otherwise, time series designs are recommended. Current Controlled Trials ISRCTN41002956. This project was funded by the National Institute for Health Research (NIHR) Health Technology Assessment programme and will be published in full in Health Technology Assessment ; Vol. 21, No. 27. See the NIHR Journals Library website for further project information.
The Feasibility of Implementing Multicommand Software Functions on a Microcomputer Network.
1979-10-01
studies 20 ABSTRACT fConllnuo on revete &Ide it necessary and Identify by block number) ’This report presents the results of a study of design...considerations for hybrid monitor systems for distributed microcomputer networks. The objective of the study was to determine the feasibility of such monitor...Management Informa- tion and Computer Sciences. The study was one task on a project bentitled "The Feasibility of Implementing Multicommand Software
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
... CFR Parts 1910 and 1926 Interpretation of OSHA's Provisions for Feasible Administrative or Engineering... feasible administrative or engineering controls as used in the applicable sections of OSHA's General... administrative or engineering controls rather than personal protective equipment (PPE) to reduce noise exposures...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... CFR Parts 1910 and 1926 Interpretation of OSHA's Provisions for Feasible Administrative or Engineering... Administrative or Engineering Controls of Occupational Noise, giving interested parties 60 days to comment. The... Provisions for Feasible Administrative or Engineering Controls of Occupational Noise. The notice proposed to...
Feasibility study guidelines for public private partnership projects : Vol. 1 & 2
DOT National Transportation Integrated Search
2010-10-01
For many state Departments of Transportation (DOTs), a shortage of transportation funds requires the : agencies to combat that shortage by implementing innovative programs. Nationwide, Public Private : Partnerships (PPP) in transportation projects ar...
Commuter Connection : Flexible Ridesharing in Marin County, California
DOT National Transportation Integrated Search
1981-12-01
This is a final report documenting the Commuter Connection Flexible Registered Ridesharing Demonstration Project. The purpose of this project was to test the feasibility of flexible registered ridesharing, which is a system whereby registered commute...
Frederick County road orders 1743-1772.
DOT National Transportation Integrated Search
2005-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Fincastle County road orders 1773-1776.
DOT National Transportation Integrated Search
2007-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Feasibility study guideline for public private partnership projects : volume I & II.
DOT National Transportation Integrated Search
2010-10-01
For many state Departments of Transportation (DOTs), a shortage of transportation funds requires the : agencies to combat that shortage by implementing innovative programs. Nationwide, Public Private : Partnerships (PPP) in transportation projects ar...
Montgomery County road orders 1777-1806.
DOT National Transportation Integrated Search
2008-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Amelia County road orders, 1735-1753.
DOT National Transportation Integrated Search
2002-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Hovercraft Underwater Noise Measurements in Alaska.
DOT National Transportation Integrated Search
2001-04-02
The United States Postal Service (USPS) is finishing a two-year demonstration project : examining the feasibility of mail delivery via hovercraft to remote Alaskan villages. Prior to this : demonstration project, and in support of the Environmental A...
Assessing the SunGuide and STEWARD databases.
DOT National Transportation Integrated Search
2017-02-01
This project evaluated the feasibility of using the existing software and data bases as platforms : for analyzing the attributes of electric vehicles within present and future transportation : infrastructure projects and models. The Florida based Sun...
Botetourt County road orders 1770-1778.
DOT National Transportation Integrated Search
2007-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Fairfax County road orders, 1749-1800.
DOT National Transportation Integrated Search
2003-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Fostering sustainable feedstock production for advanced biofuels on underutilised land in Europe
NASA Astrophysics Data System (ADS)
Mergner, Rita; Janssen, Rainer; Rutz, Dominik; Knoche, Dirk; Köhler, Raul; Colangeli, Marco; Gyuris, Peter
2017-04-01
Background In context of growing competition between land uses, bioenergy development is often seen as one of possible contributors to such competition. However, the potential of underutilized land (contaminated, abandoned, marginal, fallow land etc.) which is not used or cannot be used for productive activities is not exhausted and offers an attractive alternative for sustainable production of different biomass feedstocks in Europe. Depending on biomass feedstocks, different remediation activities can be carried out in addition. Bioenergy crops have the potential to be grown profitably on underutilized land and can therefore offer an attractive source of income on the local level contributing to achieving the targets of the Renewable Energy Directive (EC/2009). The FORBIO project The FORBIO project demonstrates the viability of using underutilised land in EU Member States for sustainable bioenergy feedstock production that does not affect the supply of food, feed and land currently used for recreational or conservation purposes. Project activities will serve to build up and strengthen local bioenergy value chains that are competitive and that meet the highest sustainability standards, thus contributing to the market uptake of sustainable bioenergy in the EU. Presented results The FORBIO project will develop a methodology to assess the sustainable bioenergy production potential on available underutilized lands in Europe at local, site-specific level. Based on this methodology, the project will produce multiple feasibility studies in three selected case study locations: Germany (lignite mining and sewage irrigation fields in the metropolis region of Berlin and Brandenburg), Italy (contaminated land from industrial activities in Sulcis, Portoscuso) and Ukraine (underutilised marginal agricultural land in the North of Kiev). The focus of the presentation will be on the agronomic and techno-economic feasibility studies in Germany, Italy and Ukraine. Agronomic feasibility studies consider agronomic performances in different climatic zones, soil conditions, land morphology, availability of irrigation infrastructures and limitations due to anthropic soil contamination. The outcomes of the techno-economic feasibility studies for the biomasses selected as potentially feasible for underutilized lands in the selected case study locations will be presented.
Mander, Rosemary; Cheung, Ngai Fen; Wang, Xiaoli; Fu, Wei; Zhu, Junghong
2010-02-01
To explore issues arising during preliminary stages of a research project in order to consider the feasibility of a midwife-led normal birthing unit in mainland China. Midwife-led normal birthing units, as a route to ensuring normality, have become a feature of western maternity care, but are unknown in China. Action research, using a qualitative descriptive approach, was performed. Data were collected at meetings, by non-participant observation and by face-to-face semi-structured interviews. Observation was undertaken in the midwife-led normal birthing unit and a standard care setting. Data analysis was by thematic analysis using constant comparison techniques. In the labour ward of a large general hospital in a major city, stakeholders included midwifery staff, managers, university staff and researchers. Childbearing women proved keen to use this service, but were unable to participate in the planning. The midwife-led normal birthing unit sought to provide one-to-one care in labour and support by a birth companion. Routine interventions were to be avoided. The midwives in the midwife-led normal birthing unit created a more suitable environment for supportive care. The midwives demonstrated high-quality communication skills. The woman's choice of position/mobility was limited. Difficulties with staffing were identified. The preliminary findings suggest that continuation of the project is feasible. The woman's role demonstrates passivity. The perception of staff shortage has serious implications. This action research project suggests that a study of a midwife-led normal birthing unit in China is feasible, with some attention to staffing issues.
Trief, Paula M; Teresi, Jeanne A; Eimicke, Joseph P; Shea, Steven; Weinstock, Ruth S
2009-03-01
with increasing prevalence of diabetes in older people, it is important to understand factors that affect their outcomes. The Informatics for Diabetes Education and Telemedicine (IDEATel) project is a demonstration project to evaluate the feasibility and effectiveness of telemedicine with diverse, medically underserved, older diabetes patients. Subjects were randomised to telemedicine case management or usual care. This intervention has been shown to result in improved medical outcomes and self-efficacy. Self-efficacy refers to one's belief that (s)he can successfully engage in a behaviour. Self-efficacy has been shown to relate to behaviour change and glycaemic control in middle-aged individuals, but not studied in older individuals. to assess whether (a) diabetes self-efficacy relates to the primary medical outcome of glycaemic control, and to secondary outcomes (blood pressure and cholesterol), and (b) whether, after an intervention, change in diabetes self-efficacy relates to change in these medical outcomes in a group of older, ethnically diverse individuals. three waves of longitudinal data from participants in IDEATel were analysed. diabetes self-efficacy at baseline correlated with glycaemic control, blood pressure and cholesterol. An increase in diabetes self-efficacy over time was related to an improvement in glycaemic control (P < 0.0001), but not in blood pressure and lipid levels. The intervention was significantly related to improved self-efficacy over time (P < 0.0001), and both directly (P = 0.022) and indirectly through self-efficacy (P < 0.001) to improved glycaemic control. The mediation effect of self-efficacy was also significant (P< 0.004). diabetes self-efficacy is a relevant construct for older diabetes patients. Thus, interventions that target enhanced self-efficacy may also result in improved glycaemic control.
ERIC Educational Resources Information Center
Griva, Eleni; Semoglou, Klio
2012-01-01
This paper outlines the rationale for and the purpose of designing and implementing a project aiming to make very young EFL learners develop their language skills through their involvement in interactive psychomotor activities. The project, which is a part of a broader longitudinal project having introduced EFL in the first primary school grade,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
...), proposing to study the feasibility of the Two Girls Creek Hydroelectric Project (Two Girls Creek Project or project) to be located on Two Girls Creek, near Sweet Home, Linn County, Oregon. The project would occupy...-diameter HDPE tailrace returning flows to Two Girls Creek above a natural fish barrier; and (5) a new 12...
7 CFR 762.146 - Other servicing procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... funds to be advanced are for authorized operating loan purposes; (ii) The financial benefit to the... refer to the original note. (5) The lender will inform the Agency of the rate change. (e) Consolidation... borrower must project a feasible plan after the consolidation. See § 762.102(b) for definition of feasible...
DOT National Transportation Integrated Search
2007-09-01
A Virtual Container Yard (VCY) is a mean of developing a shared resource information system to match empty equipment needs through the adoption of next generation internet and new technology information platforms. The project examines the feasibility...
Real options analysis for photovoltaic project under climate uncertainty
NASA Astrophysics Data System (ADS)
Kim, Kyeongseok; Kim, Sejong; Kim, Hyoungkwan
2016-08-01
The decision on photovoltaic project depends on the level of climate environments. Changes in temperature and insolation affect photovoltaic output. It is important for investors to consider future climate conditions for determining investments on photovoltaic projects. We propose a real options-based framework to assess economic feasibility of photovoltaic project under climate change. The framework supports investors to evaluate climate change impact on photovoltaic projects under future climate uncertainty.
Bailey, Julia V; Webster, Rosie; Hunter, Rachael; Griffin, Mark; Freemantle, Nicholas; Rait, Greta; Estcourt, Claudia; Michie, Susan; Anderson, Jane; Stephenson, Judith; Gerressu, Makeda; Ang, Chee Siang; Murray, Elizabeth
2016-12-01
This report details the development of the Men's Safer Sex website and the results of a feasibility randomised controlled trial (RCT), health economic assessment and qualitative evaluation. (1) Develop the Men's Safer Sex website to address barriers to condom use; (2) determine the best design for an online RCT; (3) inform the methods for collecting and analysing health economic data; (4) assess the Sexual Quality of Life (SQoL) questionnaire and European Quality of Life-5 Dimensions, three-level version (EQ-5D-3L) to calculate quality-adjusted life-years (QALYs); and (5) explore clinic staff and men's views of online research methodology. (1) Website development: we combined evidence from research literature and the views of experts ( n = 18) and male clinic users ( n = 43); (2) feasibility RCT: 159 heterosexually active men were recruited from three sexual health clinics and were randomised by computer to the Men's Safer Sex website plus usual care ( n = 84) or usual clinic care only ( n = 75). Men were invited to complete online questionnaires at 3, 6, 9 and 12 months, and sexually transmitted infection (STI) diagnoses were recorded from clinic notes at 12 months; (3) health economic evaluation: we investigated the impact of using different questionnaires to calculate utilities and QALYs (the EQ-5D-3L and SQoL questionnaire), and compared different methods to collect resource use; and (4) qualitative evaluation: thematic analysis of interviews with 11 male trial participants and nine clinic staff, as well as free-text comments from online outcome questionnaires. (1) Software errors and clinic Wi-Fi access presented significant challenges. Response rates for online questionnaires were poor but improved with larger vouchers (from 36% with £10 to 50% with £30). Clinical records were located for 94% of participants for STI diagnoses. There were no group differences in condomless sex with female partners [incidence rate ratio (IRR) 1.01, 95% confidence interval (CI) 0.52 to 1.96]. New STI diagnoses were recorded for 8.8% (7/80) of the intervention group and 13.0% (9/69) of the control group (IRR 0.75, 95% CI 0.29 to 1.89). (2) Health-care resource data were more complete using patient files than questionnaires. The probability that the intervention is cost-effective is sensitive to the source of data used and whether or not data on intended pregnancies are included. (3) The pilot RCT fitted well around clinical activities but 37% of the intervention group did not see the Men's Safer Sex website and technical problems were frustrating. Men's views of the Men's Safer Sex website and research procedures were largely positive. It would be feasible to conduct a large-scale RCT using clinic STI diagnoses as a primary outcome; however, technical errors and a poor response rate limited the collection of online self-reported outcomes. The next steps are (1) to optimise software for online trials, (2) to find the best ways to integrate digital health promotion with clinical services, (3) to develop more precise methods for collecting resource use data and (4) to work out how to overcome barriers to digital intervention testing and implementation in the NHS. Current Controlled Trials ISRCTN18649610. This project was funded by the NIHR Health Technology Assessment programme and will be published in full in Health Technology Assessment ; Vol. 20, No. 91. See the NIHR Journals Library website for further project information.
Improving patient satisfaction with pain management using Six Sigma tools.
DuPree, Erin; Martin, Lisa; Anderson, Rebecca; Kathuria, Navneet; Reich, David; Porter, Carol; Chassin, Mark R
2009-07-01
Patient satisfaction as a direct and public measure of quality of care is changing the way hospitals address quality improvement. The feasibility of using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) methodology to improve patient satisfaction as it relates to pain management was evaluated. This project used the DMAIC methodology to improve patients' overall satisfaction with pain management on two inpatient units in an urban academic medical center. Pre- and postintervention patient surveys were conducted. The DMAIC methodology provided a data-driven structure to determine the optimal improvement strategies, as well as a long-term plan for maintaining any improvements. In addition, the Change Acceleration Process (CAP) was used throughout the project's various DMAIC stages to further the work of the team by creating a shared need to meet the objectives of the project. Overall satisfaction with pain management "excellent" ratings increased from 37% to 54%. Both units surpassed the goal of at least 50% of responses in the "excellent" category. Several key drivers of satisfaction with pain management were uncovered in the Analyze phase of the project, and each saw rating increases from the pre-intervention to postintervention surveys. Ongoing monitoring by the hospital inpatient satisfaction survey showed that the pain satisfaction score improved in subsequent quarters as compared with the pre-intervention period. The Six Sigma DMAIC methodology can be used successfully to improve patient satisfaction. The project led to measurable improvements in patient satisfaction with pain management, which have endured past the duration of the Six Sigma project. The Control phase of DMAIC allows the improvements to be incorporated into daily operations.
CarbonSAFE Illinois - Macon County
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whittaker, Steve
CarbonSAFE Illinois is a a Feasibility study to develop an established geologic storage complex in Macon County, Illinois, for commercial-scale storage of industrially sourced CO2. Feasibility activities are focused on the Mt. Simon Storage Complex; a step-out well will be drilled near existing storage sites (i.e., the Midwest Geological Sequestration Consortium’s Illinois Basin – Decatur Project and the Illinois Industrial Carbon Capture and Storage Project) to further establish commercial viability of this complex and to evaluate EOR potential in a co-located oil-field trend. The Archer Daniels Midland facility (ethanol plant), City Water, Light, and Power in Springfield, Illinois (coal-fired powermore » station), and other regional industries are potential sources of anthropogenic CO2 for storage at this complex. Site feasibility will be evaluated through drilling results, static and dynamic modeling, and quantitative risk assessment. Both studies will entail stakeholder engagement, consideration of infrastructure requirements, existing policy, and business models. Project data will help calibrate the National Risk Assessment Partnership (NRAP) Toolkit to better understand the risks of commercial-scale carbon storage.« less
Bridging worlds/charting new courses
NASA Astrophysics Data System (ADS)
This report describes the work being done within Sandia's renewable energy program. This work touches on four major disciplines. (1) Photovoltaics. The goal of this project is to develop costeffective, reliable energy system technologies for energy supplies worldwide produced by U.S. industry. It encompasses cell research and development, collector development, technology evaluation, systems engineering, domestic and international applications, and design assistance. (2) Solar Thermal. This project endeavors to develop and increase acceptance of solar thermal electric and industrial technologies as cost-competitive candidates for power generation and to promote their commercialization. Its' major activities are with dish/Stirling systems, the Solar Two power tower, design assistance to industry and users, technology development and research activities. (3) Wind. The wind project impacts domestic and international markets with commercially feasible systems for utility-scale and other applications of wind energy. The project conducts applied research in aerodynamics, structural dynamics, fatigue, materials and controls, and engineering systems, and develops cooperative work with industry. (4) Geothermal. This project is developing technology to increase proven geothermal reserves and is assisting industry in expanding geothermal power on-line. Development work is in stemhole drilling, drilling techniques, instrumentation for geothermal wells, acoustic telemetry, and drilling exploratory wells.
Future trends of global atmospheric antimony emissions from anthropogenic activities until 2050
NASA Astrophysics Data System (ADS)
Zhou, Junrui; Tian, Hezhong; Zhu, Chuanyong; Hao, Jiming; Gao, Jiajia; Wang, Yong; Xue, Yifeng; Hua, Shenbin; Wang, Kun
2015-11-01
This paper presents the scenario forecast of global atmospheric antimony (Sb) emissions from anthropogenic activities till 2050. The projection scenarios are built based on the comprehensive global antimony emission inventory for the period 1995-2010 which is reported in our previous study. Three scenarios are set up to investigate the future changes of global antimony emissions as well as their source and region contribution characteristics. Trends of activity levels specified as 5 primary source categories are projected by combining the historical trend extrapolation with EIA International energy outlook 2013, while the source-specific dynamic emission factors are determined by applying transformed normal distribution functions. If no major changes in the efficiency of emission control are introduced and keep current air quality legislations (Current Legislation scenario), global antimony emissions will increase by a factor of 2 between 2010 and 2050. The largest increase in Sb emissions is projected from Asia due to large volume of nonferrous metals production and waste incineration. In case of enforcing the pollutant emission standards (Strengthened Control scenario), global antimony emissions in 2050 will stabilize with that of 2010. Moreover, we can anticipate further declines in Sb emissions for all continents with the best emission control performances (Maximum Feasible Technological Reduction scenario). Future antimony emissions from the top 10 largest emitting countries have also been calculated and source category contributions of increasing emissions of these countries present significant diversity. Furthermore, global emission projections in 2050 are distributed within a 1° × 1°latitude/longitude grid. East Asia, Western Europe and North America present remarkable differences in emission intensity under the three scenarios, which implies that source-and-country specific control measures are necessary to be implemented for abating Sb emissions from varied continents and countries in the future.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... economic viability and growth of the Southern Tier and other affected areas of New York. Alternatives under... the project and is considered feasible based on engineering, cost, and social, economic, and...
Renewable Energy Feasibility Study Leading to Development of the Native Spirit Solar Energy Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carolyn Stewart; Tracey LeBeau
2008-01-31
DOE-funded renewable energy feasibility study conducted by Red Mountain Tribal Energy on behalf of the Southwest Tribal Energy Consortium (SWTEC). During the course of the study, SWTEC members considered multiple options for the organization structure, selected a proposed organization structure, and drafted a Memorandum of Understanding for the SWTEC organization. High-level resource assessments for SWTEC members were completed; surveys were developed and completed to determine each member’s interest in multiple participation options, including on-reservation projects. With the survey inputs in mind, multiple energy project options were identified and evaluated on a high-level basis. That process led to a narrowing ofmore » the field of technology options to solar generation, specifically, utility-scale Concentrating Solar-Powered Generation projects, with a specific, tentative project location identified at the Fort Mojave Indian Reservation -- the Native Spirit Solar Energy Facility.« less
Li, Jinqing; Qi, Hui; Cong, Ligang; Yang, Huamin
2017-01-01
Both symmetric and asymmetric color image encryption have advantages and disadvantages. In order to combine their advantages and try to overcome their disadvantages, chaos synchronization is used to avoid the key transmission for the proposed semi-symmetric image encryption scheme. Our scheme is a hybrid chaotic encryption algorithm, and it consists of a scrambling stage and a diffusion stage. The control law and the update rule of function projective synchronization between the 3-cell quantum cellular neural networks (QCNN) response system and the 6th-order cellular neural network (CNN) drive system are formulated. Since the function projective synchronization is used to synchronize the response system and drive system, Alice and Bob got the key by two different chaotic systems independently and avoid the key transmission by some extra security links, which prevents security key leakage during the transmission. Both numerical simulations and security analyses such as information entropy analysis, differential attack are conducted to verify the feasibility, security, and efficiency of the proposed scheme. PMID:28910349
A Summary of NASA Research Exploring the Acoustics of Small Unmanned Aerial Systems
NASA Technical Reports Server (NTRS)
Zawodny, Nikolas S.; Christian, Andrew; Cabell, Randolph
2018-01-01
Proposed uses of small unmanned aerial systems (sUAS) have the potential to expose large portions of communities to a new noise source. In order to understand the potential noise impact of sUAS, NASA initiated acoustics research as one component of the 3-year DELIVER project, with the goal of documenting the feasibility of using existing aircraft design tools and methods on this class of vehicles. This paper summarizes the acoustics research conducted within the DELIVER project. The research described here represents an initial study, and subsequent research building on the findings of this work has been proposed for other NASA projects. The paper summarizes acoustics research in four areas: measurements of noise generated by flyovers of small unmanned aerial vehicles, measurements in controlled test facilities to understand the noise generated by components of these vehicles, computational predictions of component and full vehicle noise, and psychoacoustic tests including auralizations conducted to assess human annoyance to the noise generated by these vehicles.
NASA Astrophysics Data System (ADS)
Zhang, Zhan-Jun; Liu, Yi-Min; Man, Zhong-Xiao
2005-11-01
We present a method to teleport multi-qubit quantum information in an easy way from a sender to a receiver via the control of many agents in a network. Only when all the agents collaborate with the quantum information receiver can the unknown states in the sender's qubits be fully reconstructed in the receiver's qubits. In our method, agents's control parameters are obtained via quantum entanglement swapping. As the realization of the many-agent controlled teleportation is concerned, compared to the recent method [C.P. Yang, et al., Phys. Rev. A 70 (2004) 022329], our present method considerably reduces the preparation difficulty of initial states and the identification difficulty of entangled states, moreover, it does not need local Hadamard operations and it is more feasible in technology. The project supported by National Natural Science Foundation of China under Grant No. 10304022
Holographic digital microscopy in on-line process control
NASA Astrophysics Data System (ADS)
Osanlou, Ardeshir
2011-09-01
This article investigates the feasibility of real-time three-dimensional imaging of microscopic objects within various emulsions while being produced in specialized production vessels. The study is particularly relevant to on-line process monitoring and control in chemical, pharmaceutical, food, cleaning, and personal hygiene industries. Such processes are often dynamic and the materials cannot be measured once removed from the production vessel. The technique reported here is applicable to three-dimensional characterization analyses on stirred fluids in small reaction vessels. Relatively expensive pulsed lasers have been avoided through the careful control of the speed of the moving fluid in relation to the speed of the camera exposure and the wavelength of the continuous wave laser used. The ultimate aim of the project is to introduce a fully robust and compact digital holographic microscope as a process control tool in a full size specialized production vessel.
Radford, Kate; Sutton, Chris; Sach, Tracey; Holmes, Jain; Watkins, Caroline; Forshaw, Denise; Jones, Trevor; Hoffman, Karen; O'Connor, Rory; Tyerman, Ruth; Merchán-Baeza, Jose Antonio; Morris, Richard; McManus, Emma; Drummond, Avril; Walker, Marion; Duley, Lelia; Shakespeare, David; Hammond, Alison; Phillips, Julie
2018-05-01
Up to 160,000 people incur traumatic brain injury (TBI) each year in the UK. TBI can have profound effects on many areas of human functioning, including participation in work. There is limited evidence of the clinical effectiveness and cost-effectiveness of vocational rehabilitation (VR) after injury to promote early return to work (RTW) following TBI. To assess the feasibility of a definitive, multicentre, randomised controlled trial (RCT) of the clinical effectiveness and cost-effectiveness of early, specialist VR plus usual care (UC) compared with UC alone on work retention 12 months post TBI. A multicentre, feasibility, parallel-group RCT with a feasibility economic evaluation and an embedded mixed-methods process evaluation. Randomisation was by remote computer-generated allocation. Three NHS major trauma centres (MTCs) in England. Adults with TBI admitted for > 48 hours and working or studying prior to injury. Early specialist TBI VR delivered by occupational therapists (OTs) in the community using a case co-ordination model. Self-reported RTW 12 months post randomisation, mood, functional ability, participation, work self-efficacy, quality of life and work ability. Feasibility outcomes included recruitment and retention rates. Follow-up was by postal questionnaires in two centres and face to face in one centre. Those collecting data were blind to treatment allocation. Out of 102 target participants, 78 were recruited (39 randomised to each arm), representing 39% of those eligible and 5% of those screened. Approximately 2.2 patients were recruited per site per month. Of those, 56% had mild injuries, 18% had moderate injuries and 26% had severe injuries. A total of 32 out of 45 nominated carers were recruited. A total of 52 out of 78 (67%) TBI participants responded at 12 months (UC, n = 23; intervention, n = 29), completing 90% of the work questions; 21 out of 23 (91%) UC respondents and 20 out of 29 (69%) intervention participants returned to work at 12 months. Two participants disengaged from the intervention. Face-to-face follow-up was no more effective than postal follow-up. RTW was most strongly related to social participation and work self-efficacy. It is feasible to assess the cost-effectiveness of VR. Intervention was delivered as intended and valued by participants. Factors likely to affect a definitive trial include deploying experienced OTs, no clear TBI definition or TBI registers, and repatriation of more severe TBI from MTCs, affecting recruitment of those most likely to benefit/least likely to drop out. Target recruitment was not reached, but mechanisms to achieve this in future studies were identified. Retention was lower than expected, particularly in UC, potentially biasing estimates of the 12-month RTW rate. This study met most feasibility objectives. The intervention was delivered with high fidelity. When objectives were not met, strategies to ensure feasibility of a full trial were identified. Future work should test two-stage recruitment and include resources to recruit from 'spokes'. A broader measure covering work ability, self-efficacy and participation may be a more sensitive outcome. Current Controlled Trials ISRCTN38581822. This project was funded by the National Institute for Health Research (NIHR) Health Technology Assessment programme and will be published in full in Health Technology Assessment ; Vol. 22, No. 33. See the NIHR Journals Library website for further project information.
Post, Douglas M; Shapiro, Charles L; Cegala, Donald J; David, Prabu; Katz, Mira L; Krok, Jessica L; Phillips, Gary S; McAlearney, Ann Sheck; Lehman, Jennifer S; Hicks, William; Paskett, Electra D
2013-12-01
Communication problems impede effective symptom management during chemotherapy. The primary aim of this pilot randomized controlled trial was to test the effects of a personal digital assistant-delivered communication intervention on pain, depression, and fatigue symptoms among breast cancer patients undergoing chemotherapy. Secondary aims included assessment of 1) study feasibility, 2) patient and clinician responses to study participation, and 3) intervention effects on health-related quality of life (HRQoL) and communication self-efficacy. Intervention group participants (n = 27) completed symptom inventories at baseline, once per week during treatment, and at posttreatment. Depending on symptom severity, they viewed race-concordant videos on how to communicate about pain, depression and/or fatigue, using the personal digital assistant. Symptom records were tracked and shared with clinicians. Control group participants (n = 23) received usual care. Longitudinal random effects modeling assessed the changes in average symptom scores over time. Descriptive statistics assessed study feasibility and intervention effects on HRQoL and communication self-efficacy. Postintervention focus groups, interviews, and surveys assessed responses to study participation. Mean age of the participants was 51.0 years; 42 participants (84%) were white. In comparison with control, intervention group participants reported lower average pain severity over time (P = .015). Mean pain interference scores over time were marginally different between groups (P = .07); mean depression and fatigue scores over time were statistically nonsignificant. Feasibility outcomes and perspectives about study participation were positive. Mean pre-post decreases in HRQoL were generally higher among intervention group participants; pre-post changes in communication self-efficacy were equivalent. Mixed findings of the study indicate the need for future research.
2013-01-01
Background Communication problems impede effective symptom management during chemotherapy. The primary aim of this pilot randomized controlled trial was to test the effects of a personal digital assistant–delivered communication intervention on pain, depression, and fatigue symptoms among breast cancer patients undergoing chemotherapy. Secondary aims included assessment of 1) study feasibility, 2) patient and clinician responses to study participation, and 3) intervention effects on health-related quality of life (HRQoL) and communication self-efficacy. Methods Intervention group participants (n = 27) completed symptom inventories at baseline, once per week during treatment, and at posttreatment. Depending on symptom severity, they viewed race-concordant videos on how to communicate about pain, depression and/or fatigue, using the personal digital assistant. Symptom records were tracked and shared with clinicians. Control group participants (n = 23) received usual care. Longitudinal random effects modeling assessed the changes in average symptom scores over time. Descriptive statistics assessed study feasibility and intervention effects on HRQoL and communication self-efficacy. Postintervention focus groups, interviews, and surveys assessed responses to study participation. Results Mean age of the participants was 51.0 years; 42 participants (84%) were white. In comparison with control, intervention group participants reported lower average pain severity over time (P = .015). Mean pain interference scores over time were marginally different between groups (P = .07); mean depression and fatigue scores over time were statistically nonsignificant. Feasibility outcomes and perspectives about study participation were positive. Mean pre–post decreases in HRQoL were generally higher among intervention group participants; pre–post changes in communication self-efficacy were equivalent. Conclusion Mixed findings of the study indicate the need for future research. PMID:24395985
2012-08-02
REPORT Feasibility study for the use of green, bio-based, efficient reactive sorbent material to neutralize chemical warfare agents 14. ABSTRACT 16...way cellulose, lignin and hemicelluloses interact as well as whole wood dissolution occurs in ILs. The present project was conducted to 1. REPORT...Feasibility study for the use of green, bio-based, efficient reactive sorbent material to neutralize chemical warfare agents Report Title ABSTRACT Over the
Great Basin Native Plant Project: 2014 Progress Report
Francis Kilkenny; Anne Halford; Alexis Malcomb
2015-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead by the...
Great Basin Native Plant Project: 2013 Progress Report
Francis Kilkenny; Nancy Shaw; Corey Gucker
2014-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead by the...
NASA Astrophysics Data System (ADS)
Amon, D. M.
Progress is reviewed in a project to test the economic feasibility of wind turbine technology for generating electricity. The use of wind generating electricity on a commercial fruit farm interconnecting a commercial fruit farm with a major utility to sell power are the find project goals.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13315-001] Yegua Mesa Hydro... Intervene, and Competing Applications On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a... studying the feasibility of the Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or...
PROACT user's guide: how to use the pallet recovery opportunity analysis computer tool
E. Bradley Hager; A.L. Hammett; Philip A. Araman
2003-01-01
Pallet recovery projects are environmentally responsible and offer promising business opportunities. The Pallet Recovery Opportunity Analysis Computer Tool (PROACT) assesses the operational and financial feasibility of potential pallet recovery projects. The use of project specific information supplied by the user increases the accuracy and the validity of the...
The Feasibility of Determining Success Criteria for Educational Research and Development Projects.
ERIC Educational Resources Information Center
Ball, Rodney J.; Cook, Desmond L.
The determination of final success of educational research and development projects is an important problem for those concerned with project management and evaluation. The purpose of this study was twofold: (a) to determine if schedule, cost, quality/performance, follow-on work, spin-off benefits, and customer/client satisfaction were given a…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...
Flight Performance Feasibility Studies for the Max Launch Abort System
NASA Technical Reports Server (NTRS)
Tarabini, Paul V.; Gilbert, Michael G.; Beaty, James R.
2013-01-01
In 2007, the NASA Engineering and Safety Center (NESC) initiated the Max Launch Abort System Project to explore crew escape system concepts designed to be fully encapsulated within an aerodynamic fairing and smoothly integrated onto a launch vehicle. One objective of this design was to develop a more compact launch escape vehicle that eliminated the need for an escape tower, as was used in the Mercury and Apollo escape systems and what is planned for the Orion Multi-Purpose Crew Vehicle (MPCV). The benefits for the launch vehicle of eliminating a tower from the escape vehicle design include lower structural weights, reduced bending moments during atmospheric flight, and a decrease in induced aero-acoustic loads. This paper discusses the development of encapsulated, towerless launch escape vehicle concepts, especially as it pertains to the flight performance and systems analysis trade studies conducted to establish mission feasibility and assess system-level performance. Two different towerless escape vehicle designs are discussed in depth: one with allpropulsive control using liquid attitude control thrusters, and a second employing deployable aft swept grid fins to provide passive stability during coast. Simulation results are presented for a range of nominal and off-nominal escape conditions.
The commercial feasibility of underground coal gasification in southern Thailand
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solc, J.; Young, B.C.; Harju, J.A.
Underground Coal Gasification (UCG) is a clean coal technology with the commercial potential to provide low- or medium-Btu gas for the generation of electric power. While the abundance of economic coal and natural gas reserves in the United States of America (USA) has delayed the commercial development of this technology in the USA, potential for commercial development of UCG-fueled electric power generation currently exists in many other nations. Thailand has been experiencing sustained economic growth throughout the past decade. The use of UCG to provide electric power to meet the growing power demand appears to have commercial potential. A projectmore » to determine the commercial feasibility of UCG-fueled electric power generation at a site in southern Thailand is in progress. The objective of the project is to determine the commercial feasibility of using UCG for power generation in the Krabi coal mining area located approximately 1,000 kilometers south of Bangkok, Thailand. The project team has developed a detailed methodology to determine the technical feasibility, environmental acceptability, and commercial economic potential of UCG at a selected site. In the methodology, hydrogeologic conditions of the coal seam and surrounding strata are determined first. These results and information describing the local economic conditions are then used to assess the commercial potential of the UCG application. The methodology for evaluating the Krabi UCG site and current project status are discussed in this paper.« less
NASA Technical Reports Server (NTRS)
Iannicca, Dennis C.; Ishac, Joseph A.; Shalkhauser, Kurt A.
2015-01-01
NASA Glenn Research Center (GRC), in cooperation with Rockwell Collins, is working to develop a prototype Control and Non-Payload Communications (CNPC) radio platform as part of NASA Integrated Systems Research Program's (ISRP) Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. A primary focus of the project is to work with the Federal Aviation Administration (FAA) and industry standards bodies to build and demonstrate a safe, secure, and efficient CNPC architecture that can be used by industry to evaluate the feasibility of deploying a system using these technologies in an operational capacity. GRC has been working in conjunction with these groups to assess threats, identify security requirements, and to develop a system of standards-based security controls that can be applied to the GRC prototype CNPC architecture as a demonstration platform. The proposed security controls were integrated into the GRC flight test system aboard our S-3B Viking surrogate aircraft and several network tests were conducted during a flight on November 15th, 2014 to determine whether the controls were working properly within the flight environment. The flight test was also the first to integrate Robust Header Compression (ROHC) as a means of reducing the additional overhead introduced by the security controls and Mobile IPv6. The effort demonstrated the complete end-to-end secure CNPC link in a relevant flight environment.
LST CGM Generator and Viewer Final Report CRADA No. TSB-1558-98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vickers, Don; Larson, Don
The purpose of this project was to jointly develop and test a software plug-in that would convert native Pro /ENGINEER digital engineering drawings to Computer Graphics Metafile (CGM) format. If it was not feasible to convert the Pro/ENGINEER files, we planned to develop and test a similar conversion of native AutoCAD engineering drawings to CGM. CGM viewer plug-ins were developed as needed. There were four main tasks in this project: 1. Requirements for CGM Plug-in 2. Product Evaluation 3. Product Development Feasibility Study 4. Developing a "Plug-In" Application.
Project WISH: The Emerald City
NASA Technical Reports Server (NTRS)
Oz, Hayrani; Slonksnes, Linda (Editor); Rogers, James W. (Editor); Sherer, Scott E. (Editor); Strosky, Michelle A. (Editor); Szmerekovsky, Andrew G. (Editor); Klupar, G. Joseph (Editor)
1990-01-01
The preliminary design of a permanently manned autonomous space oasis (PEMASO), including its pertinent subsystems, was performed during the 1990 Winter and Spring quarters. The purpose for the space oasis was defined and the preliminary design work was started with emphasis placed on the study of orbital mechanics, power systems and propulsion systems. A rotating torus was selected as the preliminary configuration, and overall size, mass and location of some subsystems within the station were addressed. Computer software packages were utilized to determine station transfer parameters and thus the preliminary propulsion requirements. Power and propulsion systems were researched to determine feasible configurations and many conventional schemes were ruled out. Vehicle dynamics and control, mechanical and life support systems were also studied. For each subsystem studied, the next step in the design process to be performed during the continuation of the project was also addressed.
NASA Technical Reports Server (NTRS)
Pellionisz, Andras J.; Jorgensen, Charles C.; Werbos, Paul J.
1992-01-01
A key question is how to utilize civilian government agencies along with an industrial consortium to successfully complement the so far primarily defense-oriented neural network research. Civilian artificial neural system projects, such as artificial cerebellar neurocontrollers aimed at duplicating nature's existing neural network solutions for adaptive sensorimotor coordination, are proposed by such a synthesis. The cerebellum provides an intelligent interface between higher possibly symbolic levels of human intelligence and repetitious demands of real world conventional controllers. The generation of such intelligent interfaces could be crucial to the economic feasibility of the human settlement of space and an improvement in telerobotics techniques to permit the cost-effective exploitation of nonterrestrial materials and planetary exploration and monitoring. The authors propose a scientific framework within which such interagency activities could effectively cooperate.
Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases
NASA Technical Reports Server (NTRS)
Moton, Tryshanda
2016-01-01
Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.
Code of Federal Regulations, 2011 CFR
2011-01-01
... that, when feasible and legally possible, inequities within the proposed project's service area for the..., completion of the project. Inequities are defined as unjustified variations in availability, adequacy, or... under different financing, rates, terms, or conditions do not necessarily constitute inequities. ...
Development of an early-stage toll revenue estimation model.
DOT National Transportation Integrated Search
2012-05-01
With agencies and states increasingly considering tolls as a means to finance transportation infrastructure, : there is an increasing need to quickly assess the feasibility of potential tolling projects. In the early stages : of a project when an age...
NASA Technical Reports Server (NTRS)
Dominick, Jeffrey; Bull, John; Healey, Kathleen J.
1990-01-01
The NASA Systems Autonomy Demonstration Project (SADP) was initiated in response to Congressional interest in Space station automation technology demonstration. The SADP is a joint cooperative effort between Ames Research Center (ARC) and Johnson Space Center (JSC) to demonstrate advanced automation technology feasibility using the Space Station Freedom Thermal Control System (TCS) test bed. A model-based expert system and its operator interface were developed by knowledge engineers, AI researchers, and human factors researchers at ARC working with the domain experts and system integration engineers at JSC. Its target application is a prototype heat acquisition and transport subsystem of a space station TCS. The demonstration is scheduled to be conducted at JSC in August, 1989. The demonstration will consist of a detailed test of the ability of the Thermal Expert System to conduct real time normal operations (start-up, set point changes, shut-down) and to conduct fault detection, isolation, and recovery (FDIR) on the test article. The FDIR will be conducted by injecting ten component level failures that will manifest themselves as seven different system level faults. Here, the SADP goals, are described as well as the Thermal Control Expert System that has been developed for demonstration.
Tuberculosis in the workplace: developing partnerships with the garment industries in Bangladesh.
Zafar Ullah, A N; Huque, R; Husain, A; Akter, S; Akter, H; Newell, J N
2012-12-01
To implement and evaluate a public-private partnership model involving garment factories to reduce the tuberculosis (TB) burden in this workforce. We used operational research to develop and evaluate a mechanism for effective and sustainable TB control in workplaces in three areas of Dhaka, Bangladesh. Strategies, protocols, guides and tools were developed with stakeholders. We assessed the impact of the project using quantitative and qualitative measures: changes in TB outcomes were calculated using standard indicators based on factory and DOTS centre records; changes in TB care-seeking behaviour were assessed using qualitative in-depth interviews with factory managers and medical personnel, and focus group discussions with factory workers, including TB patients. The project brought positive changes in knowledge, attitudes and practices of managers, workers and health care providers on TB care and control. During 2008-2010, a total of 3372 workers from a workforce of 69,000 were referred for sputum microscopy and 598 were diagnosed with smear-positive TB, 145 of whom received care at their workplace. The overall treatment success rate was 100%. It is feasible to engage factories in TB control activities in Bangladesh, and thereby increase case notifications and improve treatment outcomes.
UMCS feasibility study for Fort George G. Meade volume 1. Feasibility study
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
Fort George G. Meade selected 83 buildings, from the approximately 1,500 buildings on the base to be included in the UMCS Feasibility Study. The purpose of the study is to evaluate the feasibility of replacing the existing analog based Energy Monitoring and Control System (EMCS) with a new distributed process Monitoring and Control System (UMCS).
Feasibility and Design Implications of Fuel Cell Power for Sealift Vessels
2009-08-01
N SW C C D -C IS D -2 00 9- 00 9 Fe as ib ili ty a nd D es ig n Im pl ic at io ns o f F ue l C el l P ow er fo r S ea lif t V es se ls Naval...shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number...with moderate power requirements. Using a military sealift vessel as the platform, this project aims at investigating the implications of implementing
Construction in space - Toward a fresh definition of the man/machine relation
NASA Technical Reports Server (NTRS)
Watters, H. H.; Stokes, J. W.
1979-01-01
The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.
NASA Technical Reports Server (NTRS)
Chan, Agnes; Conley, Kristin; Javorski, Christian T.; Cheung, Kwok-Hung; Crivelli, Paul M.; Torrey, Nancy P.; Traver, Michael L.
1992-01-01
Increase in energy demands coupled with rapid depletion of natural energy resources have deemed solar energy as the most logical alternative source of power. The major objective of this project was to build a solar powered remotely controlled aircraft to demonstrate the feasibility of solar energy as an effective, alternate source of power. The final design was optimized for minimum weight and maximum strength of the structure. These design constraints necessitated a carbon fiber composite structure. Surya is a lightweight, durable aircraft capable of achieving level flight powered entirely by solar cells.
Babazadeh, Towhid; Fathi, Behrouz; Shaghaghi, Abdolreza; Allahverdipour, Hamid
2017-01-01
Background: Health promoting schools (HPS) project is currently being used in Iran but many challenges still lie ahead. The present study aimed, to test feasibility of implementing a comprehensive advocacy program (CAP) to overcome the obstacles and problems associated with the consummation of school health programs based on the HPS framework. Methods: This quasi-experimental study was performed through recruiting all schools that were enrolled in the national HPS program and located in Jolfa as the intervention group and all of the schools situated in the East Azerbaijan province as control. In order to collect data, Iranian Ministry of Health's checklists and external audit guidelines for HPS were utilized. In addition, to plan a CAP required data for coordinating fund raising activities including current rules and regulations regarding implementation of local health promotion interventions were collected. Results: Findings of the study revealed that the implemented CAP had improved all HPS dimensions' mean score in the intervention group. The observed change in the pre- and post-test score in the intervention group was significant (P < 0.05). The intervention was also successful in encouraging signing of an agreement among the participated organizations to be committed to pursue the adopted policies in facilitation of progress towards full implementation of the local HPS project. Conclusion: Commencing changes in the recruited schools' structure through coordinated multi-level activities is feasible and this must be considered as a priority where contextual determinants exist to motivate progress towards providing healthier educational settings for school aged children in Iran.
NASA Astrophysics Data System (ADS)
Radach, Günther; Gekeler, Jens
1996-09-01
Research carried out within the framework of the MAST project NOWESP (North-West European Shelf Programme) was based on a multi-parameter data set of existing marine data, relevant for estimating trends, variability and fluxes on the Northwest European Shelf. The data sets were provided by the partners of the project. Additional data sets were obtained from several other institutions. During the project, the data were organized in the NOWESP Research Data Base (NRDB), for which a special data base scheme was defined that was capable of storing different types of marine data. Data products, like time series and interpolated fields, were provided to the partners for analysis (Radach et al. [1997]). After three years of project time, the feasibility of such an approach is discussed. Ways of optimizing data access and evaluation are proposed. A project-oriented Research Data Base is a useful tool because of its flexibility and proximity to the research being carried out. However, several requirements must be met to derive optimum benefits from this type of service unit. Since this task usually is carried out by a limited number of staff, an early start of project data management is recommended. To enable future projects to succeed in an analogous compilation of relevant data for their use, as performed in NOWESP, the task of organizing the data sets for any short-term project should be shared between a research data base group and a national or international data centre whose experience and software could be used. It must be ensured that only quality controlled data sets from the individual data-produ cing projects are delivered to the national data centres. It is recommended that data quality control should be performed by the originators and/or data centres before delivering any data sets to the research data base. Delivery of the (full) data sets should be checked and their quality should be approved by authorized data centres.
DOT National Transportation Integrated Search
1987-04-01
The general objective of the project was to determine the feasibility of and the general requirements for a centralized database on driver behavior and attitudes related to drunk driving and occupant restraints. Volume III is a compendium of question...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
..., engineering or design work and purchasing existing facilities or right-of-way. 3. Livability: Increasing... Feasibility: The technical feasibility of the project should be demonstrated by engineering and design studies and activities; the development of design criteria and/or a basis of design; the basis for the cost...
DOT National Transportation Integrated Search
1987-04-24
The general objective of the project was to determine the feasibility of and the general requirements for a centralized database on driver behavior and attitudes related to drunk driving and occupant restraints. Volume I assesses the extent of pertin...
Viability of Controlling Prosthetic Hand Utilizing Electroencephalograph (EEG) Dataset Signal
NASA Astrophysics Data System (ADS)
Miskon, Azizi; A/L Thanakodi, Suresh; Raihan Mazlan, Mohd; Mohd Haziq Azhar, Satria; Nooraya Mohd Tawil, Siti
2016-11-01
This project presents the development of an artificial hand controlled by Electroencephalograph (EEG) signal datasets for the prosthetic application. The EEG signal datasets were used as to improvise the way to control the prosthetic hand compared to the Electromyograph (EMG). The EMG has disadvantages to a person, who has not used the muscle for a long time and also to person with degenerative issues due to age factor. Thus, the EEG datasets found to be an alternative for EMG. The datasets used in this work were taken from Brain Computer Interface (BCI) Project. The datasets were already classified for open, close and combined movement operations. It served the purpose as an input to control the prosthetic hand by using an Interface system between Microsoft Visual Studio and Arduino. The obtained results reveal the prosthetic hand to be more efficient and faster in response to the EEG datasets with an additional LiPo (Lithium Polymer) battery attached to the prosthetic. Some limitations were also identified in terms of the hand movements, weight of the prosthetic, and the suggestions to improve were concluded in this paper. Overall, the objective of this paper were achieved when the prosthetic hand found to be feasible in operation utilizing the EEG datasets.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ebert, Jon Llyod
This Small Business Innovative Research (SBIR) Phase I project will demonstrate the feasibility of an innovative temperature control technology for Metal-Organic Chemical Vapor Deposition (MOCVD) process used in the fabrication of Multi-Quantum Well (MQW) LEDs. The proposed control technology has the strong potential to improve both throughput and performance quality of the manufactured LED. The color of the light emitted by an LED is a strong function of the substrate temperature during the deposition process. Hence, accurate temperature control of the MOCVD process is essential for ensuring that the LED performance matches the design specification. The Gallium Nitride (GaN) epitaxymore » process involves depositing multiple layers at different temperatures. Much of the recipe time is spent ramping from one process temperature to another, adding significant overhead to the production time. To increase throughput, the process temperature must transition over a range of several hundred degrees Centigrade many times with as little overshoot and undershoot as possible, in the face of several sources of process disturbance such as changing emissivities. Any throughput increase achieved by faster ramping must also satisfy the constraint of strict temperature uniformity across the carrier so that yield is not affected. SC Solutions is a leading supplier of embedded real-time temperature control technology for MOCVD systems used in LED manufacturing. SC’s Multiple Input Multiple Output (MIMO) temperature controllers use physics-based models to achieve the performance demanded by our customers. However, to meet DOE’s ambitious goals of cost reduction of LED products, a new generation of temperature controllers has to be developed. SC believes that the proposed control technology will be made feasible by the confluence of mathematical formulation as a convex optimization problem, new efficient and scalable algorithms, and the increase in computational power available for real-time control.« less
Cao, Xu; Zhang, Bin; Liu, Fei; Wang, Xin; Bai, Jing
2011-12-01
Limited-projection fluorescence molecular tomography (FMT) can greatly reduce the acquisition time, which is suitable for resolving fast biology processes in vivo but suffers from severe ill-posedness because of the reconstruction using only limited projections. To overcome the severe ill-posedness, we report a reconstruction method based on the projected restarted conjugate gradient normal residual. The reconstruction results of two phantom experiments demonstrate that the proposed method is feasible for limited-projection FMT. © 2011 Optical Society of America
NASA Technical Reports Server (NTRS)
Barnes, G. D.
1982-01-01
The feasibility of a polygeneration plant at Kennedy Space Center was studied. Liquid hydrogen and gaseous nitrogen are the two principal products in consideration. Environmental parameters (air quality, water quality, biological diversity and hazardous waste disposal) necessary for the feasibility study were investigated. A National Environmental Policy Act (NEPA) project flow sheet was to be formulated for the environmental impact statement. Water quality criteria for Florida waters were to be established.
1984-09-01
is not only difficult and time consuming , but also crucial to the success of the project, the question is whether a decision support system designed...KtI I - uAujvhIMtf IENE In THE FEASIBILITY OF A DECISION SUPPORT SYSTEM FOR THE DETERMINATION OF SOURCE SELECTION EVALUATION ’CRITERIA THESIS .2...INSTITUTE OF TECHNOLOGY Wright-Patterson Air Force Base, Ohio DZM=0N STATEMENT A ,’r !’ILMILSHIM S /8 4 THE FEASIBILITY OF A DECISION SUPPORT SYSTEM FOR
McMurran, Mary; Cox, W Miles; Coupe, Stephen; Whitham, Diane; Hedges, Lucy
2010-10-14
Rates of non-completion of treatments for personality disorder are high and there are indications that those who do not complete treatment have worse outcomes than those who do. Improving both cost-efficiency and client welfare require attention to engaging people with personality disorder in treatment. A motivational interview, based on the Personal Concerns Inventory, may have the ability to enhance engagement and retention in therapy. Here, we report the protocol for a feasibility study for a randomised controlled trial (RCT). All referrals accepted to the psychological service of Nottinghamshire Healthcare NHS Trust's outpatient service for people with personality disorder are eligible for inclusion. Consenting participants are randomised to receive the Personal Concerns Inventory interview plus treatment as usual or treatment as usual only. We aim to recruit 100 participants over 11/2 years. A randomised controlled trial will be considered feasible if 1 the recruitment rate to the project is 54% of all referrals (95% CI 54-64), 2 80% of clients find the intervention acceptable in terms of its practicability and usefulness (95% CI 80-91), and 3 80% of therapists report finding the intervention helpful (95% CI 80-100). In a full-scale randomised controlled trial, the primary outcome measure will be completion of treatment i.e., entry into and completion of ≥ 75% of sessions offered. Therefore, information will be collected on recruitment rates, attendance at therapy sessions, and completion of treatment. The feasibility of examining the processes of engagement will be tested by assessing the value, coherence, and attainability of goals pre-treatment, and engagement in treatment. The costs associated with the intervention will be calculated, and the feasibility of calculating the cost-benefits of the intervention will be tested. The views of clients and therapists on the intervention, collected using semi-structured interviews, will be analysed using thematic analysis. The Personal Concerns Interview as a preparation for treatment of people with personality has the potential to maximise treatment uptake, reduce unfilled places in treatment programmes, and prevent group treatments faltering through non-attendance. Most importantly, it has the potential to improve patient outcomes, helping them to function better and reduce hospitalisation. ClinicalTrials.Gov.UK Identifier--NCT01132976.
DOT National Transportation Integrated Search
2003-05-01
This research project studied the feasibility as well as the scientific validity and utility of performing functional capacity screening with older drivers. A Model Program was described encompassing procedures to detect functionally impaired drivers...
Investigation of the Use of Match Cure Technology in the Precast Concrete Industry
DOT National Transportation Integrated Search
1998-08-01
This project was proposed to evaluate the feasibility and methodology of implementing match cure technology and maturity measurement systems into TxDOT acceptance criteria for concrete construction projects. This report will deal strictly with the in...
33 CFR 385.26 - Project Implementation Reports.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Implementation Report is a document that provides information on plan formulation and evaluation, engineering and..., environmental and/or economic benefits, engineering and design, costs, environmental impacts, real estate..., optimization and justification, cost-effectiveness, and engineering feasibility of the project; (xiii) Include...
Magnetic sensor for nondestructive evaluation of deteriorated prestressing strand.
DOT National Transportation Integrated Search
2011-08-01
This is a report describing the activities and accomplishments in this project, completed through November 30, 2009. The overall goal of this project is to investigate the feasibility of a magnetic sensor to detect in-situ corrosion of prestressing s...
Idaho out-of-service verification field operational test
DOT National Transportation Integrated Search
2000-02-01
The Out-of-Service Verification Field Operational Test Project was initiated in 1994. The purpose of the project was to test the feasibility of using sensors and a computerized tracking system to augment the ability of inspectors to monitor and contr...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
..., proposing to study the feasibility of the George W. Andrews Lock and Dam Hydroelectric Project. The proposed project would be located at the existing George W. Andrews Lock and Dam on the Chattahoochee River in...
Moya, Diego; Paredes, Juan; Kaparaju, Prasad
2018-01-01
RETScreen presents a proven focused methodology on pre-feasibility studies. Although this tool has been used to carry out a number of pre-feasibility studies of solar, wind, and hydropower projects; that is not the case for geothermal developments. This method paper proposes a systematic methodology to cover all the necessary inputs of the RETScreen-International Geothermal Project Model. As case study, geothermal power plant developments in the Ecuadorian context were analysed by RETScreen-International Geothermal Project Model. Three different scenarios were considered for analyses. Scenario I and II considered incentives of 132.1 USD/MWh for electricity generation and grants of 3 million USD. Scenario III considered the geothermal project with an electricity export price of 49.3 USD/MWh. Scenario III was further divided into IIIA and IIIB case studies. Scenario IIIA considered a 3 million USD grant while Scenario IIIB considered an income of 8.9 USD/MWh for selling heat in direct applications. Modelling results showed that binary power cycle was the most suitable geothermal technology to produce electricity along with aquaculture and greenhouse heating for direct use applications in all scenarios. Financial analyses showed that the debt payment would be 5.36 million USD/year under in Scenario I and III. The correspindig values for Scenario II was 7.06 million USD/year. Net Present Value was positive for all studied scenarios except for Scenario IIIA. Overall, Scenario II was identified as the most feasible project due to positive NPV with short payback period. Scenario IIIB could become financially attractive by selling heat for direct applications. The total initial investment for a 22 MW geothermal power plant was 114.3 million USD (at 2017 costs). Economic analysis showed an annual savings of 24.3 million USD by avoiding fossil fuel electricity generation. More than 184,000 tCO 2 eq. could be avoided annually.
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
The State of Hawaii Department of Education Job Sharing Pilot Project.
ERIC Educational Resources Information Center
Hawaii State Dept. of Education, Honolulu.
Intended to test the feasibility of job-sharing in Hawaii's schools, this project was set up to provide job sharing of one hundred teaching positions on a fifty-fifty basis between experienced tenured teachers and new hires. The report describes the purpose and intent of the project; defines job sharing; establishes tentative guidelines for…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...
Outcomes Assessment in Postsecondary Occupational Programs: A Consortial Approach. Project Report.
ERIC Educational Resources Information Center
Winter, Gene M.; Fadale, LaVerna M.
The Two-Year College Development Center, in cooperation with the New York State Education Department and seven community colleges in the Mid-Hudson Region of New York State conducted a 2-year project to determine the outcomes of selected occupational technical programs and feasible ways to measure them. The project operated as a consortium with…
Environmental pollution and shipping feasibility of the Nicaragua Canal.
Chen, Jihong; Zeng, Xin; Deng, Yibing
2016-12-15
In recent years, the Nicaraguan government's renewed interest in constructing this interoceanic canal has once again aroused widespread concern, particularly in the global shipping industry. The project's immense ecological risks, coupled with the recent expansions of both the Panama Canal and the Suez Canal, have raised questions among scientists and experts about its viability. Whether the Nicaragua Canal is really feasible for international shipping, given its high marine pollution risks, requires the further study. This paper discusses and analyses the feasibility of the Nicaragua Canal in the context of its environmental impact and value as a shipping service. This paper aims to provide an important information reference to inform strategic decision-making among policymakers and stakeholders. Our research results indicate that the environmental complexity, economic costs and safety risks of building a new transoceanic canal are simply too high to justify the project. Copyright © 2016 Elsevier Ltd. All rights reserved.
Propulsion Risk Reduction Activities for Non-Toxic Cryogenic Propulsion
NASA Technical Reports Server (NTRS)
Smith, Timothy D.; Klem, Mark D.; Fisher, Kenneth
2010-01-01
The Propulsion and Cryogenics Advanced Development (PCAD) Project s primary objective is to develop propulsion system technologies for non-toxic or "green" propellants. The PCAD project focuses on the development of non-toxic propulsion technologies needed to provide necessary data and relevant experience to support informed decisions on implementation of non-toxic propellants for space missions. Implementation of non-toxic propellants in high performance propulsion systems offers NASA an opportunity to consider other options than current hypergolic propellants. The PCAD Project is emphasizing technology efforts in reaction control system (RCS) thruster designs, ascent main engines (AME), and descent main engines (DME). PCAD has a series of tasks and contracts to conduct risk reduction and/or retirement activities to demonstrate that non-toxic cryogenic propellants can be a feasible option for space missions. Work has focused on 1) reducing the risk of liquid oxygen/liquid methane ignition, demonstrating the key enabling technologies, and validating performance levels for reaction control engines for use on descent and ascent stages; 2) demonstrating the key enabling technologies and validating performance levels for liquid oxygen/liquid methane ascent engines; and 3) demonstrating the key enabling technologies and validating performance levels for deep throttling liquid oxygen/liquid hydrogen descent engines. The progress of these risk reduction and/or retirement activities will be presented.
Propulsion Risk Reduction Activities for Nontoxic Cryogenic Propulsion
NASA Technical Reports Server (NTRS)
Smith, Timothy D.; Klem, Mark D.; Fisher, Kenneth L.
2010-01-01
The Propulsion and Cryogenics Advanced Development (PCAD) Project s primary objective is to develop propulsion system technologies for nontoxic or "green" propellants. The PCAD project focuses on the development of nontoxic propulsion technologies needed to provide necessary data and relevant experience to support informed decisions on implementation of nontoxic propellants for space missions. Implementation of nontoxic propellants in high performance propulsion systems offers NASA an opportunity to consider other options than current hypergolic propellants. The PCAD Project is emphasizing technology efforts in reaction control system (RCS) thruster designs, ascent main engines (AME), and descent main engines (DME). PCAD has a series of tasks and contracts to conduct risk reduction and/or retirement activities to demonstrate that nontoxic cryogenic propellants can be a feasible option for space missions. Work has focused on 1) reducing the risk of liquid oxygen/liquid methane ignition, demonstrating the key enabling technologies, and validating performance levels for reaction control engines for use on descent and ascent stages; 2) demonstrating the key enabling technologies and validating performance levels for liquid oxygen/liquid methane ascent engines; and 3) demonstrating the key enabling technologies and validating performance levels for deep throttling liquid oxygen/liquid hydrogen descent engines. The progress of these risk reduction and/or retirement activities will be presented.
Munro, Julie; Adams, Richard; Campbell, Anna; Campbell, Sandra; Donaldson, Cam; Godwin, Jon; Haw, Sally; Kidd, Lisa; Lane, Chrissie; Leslie, Stephen J; Mason, Helen; Mutrie, Nanette; O'Carroll, Ronan; Taylor, Cara; Treweek, Shaun; Watson, Angus; Hubbard, Gill
2014-02-18
Patients with colorectal cancer report ongoing physical and psychological impairments and a high proportion of these patients are overweight, insufficiently active and high-risk drinkers, putting them at risk of poor recovery and risk of recurrence and comorbidities. A challenge is implementing sustainable and effective rehabilitation as part of routine care for this group. A two-arm pilot randomised controlled trial (RCT) with embedded feasibility study undertaken as a phased programme of work. The intervention involves an existing cardiac rehabilitation programme for cardiac patients accepting colorectal cancer patient referrals. The intervention consists of supervised exercise sessions run by a cardiac physiotherapist and information sessions. Phase 1 will involve one research site enrolling 12 patients to assess intervention and study design processes. Semistructured interviews with patients with colorectal cancer and cardiac patients and clinicians will be used to gather data on acceptability of the intervention and study procedures. Phase 2 will involve three sites enrolling 66 patients with colorectal cancer randomised to control or intervention groups. Outcome measures will be taken preintervention and postintervention, for phases 1 and 2. The primary outcome is accelerometer measured physical activity; secondary outcomes are self-report physical activity, quality of life, anxiety, depression, symptoms including fatigue. The following variables will also be examined to determine if these factors influence adherence and outcomes: self-efficacy, risk perception and treatments. Full ethical approval was granted by NRES Committees-North of Scotland (13/NS/0004; IRAS project ID: 121757) on 22 February 2013. The proposed work is novel in that it aims to test the feasibility and acceptability of using an evidence-based and theory driven existing cardiac rehabilitation service with patients with colorectal cancer. Should this model of rehabilitation prove to be clinically and cost effective we aim to conduct a randomised controlled trial of this intervention to measure effectiveness. ISRCTN63510637; UKCRN id 14092.
ERIC Educational Resources Information Center
Tanimura, Clinton T.
Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…
Progress in European CELSS activities
NASA Technical Reports Server (NTRS)
Skoog, A. I.
1987-01-01
The European Controlled Ecological Life Support System (CELSS) activities started in the late 1970's with system analysis and feasibility studies of Biological Life Support Systems (BLSS). The initiation for CELSS came from the industry side in Europe, but since then planning and hardware feasibility analyses have been initiated also from customer/agency side. Despite this, it is still too early to state that a CELSS program as a concerted effort has been agreed upon in Europe. However, the general CELSS objectives were accepted as planning and possible development goals for the European effort for manned space activities, and as experimental planning topics in the life sciences community for the next decades. It is expected that ecological life support systems can be tested and implemented on a space station towards the end of this century or early in the next. For the European activities a possible scenario can be projected based on ongoing life support system development activities and the present life sciences goals.
Thermal System Upgrade of the Space Environment Simulation Test Chamber
NASA Technical Reports Server (NTRS)
Desai, Ashok B.
1997-01-01
The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.
Striping truck utilization at Crawfordsville and Greenfield.
DOT National Transportation Integrated Search
2013-12-01
At the time this project was launched, INDOT was operating two paint trucks per district (one edge line truck and one center line truck). : This project was launched to determine the feasibility of painting all the lane miles in each district with a ...
SmartPark Technology Demonstration Project, Phase II: Final Report
DOT National Transportation Integrated Search
2018-05-01
The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...
ERIC Educational Resources Information Center
Lieberfeld, Lawrence
1982-01-01
Many crucial questions need to be answered before a college embarks on a construction project and makes a substantial financial commitment. Computer modeling techniques can be used to make even complex project feasibility analyses. Available from Peat, Marwick, Mitchell & Co., 345 Park Avenue, New York, NY 10154. (MSE)
ERIC Educational Resources Information Center
Daniels, Richard W.; Alden, David G.
The feasibility of generalized approaches to training military personnel in the use of different types of sonar/acoustic warfare systems was explored. The initial phase of the project consisted of the analysis of representative sonar and acoustic equipment to identify training areas and operator performance requirements that could be subjected to…
Bond Feasibility Study. Project Identification Committee Report.
ERIC Educational Resources Information Center
Wichita Public Schools, KS.
A committee, appointed by the Board of Education, was requested to make a comprehensive study of the school building needs of Unified School District No. 259. In an attempt to determine the feasibility of a general bond election to upgrade the public schools, the specific charge to the committee was to evaluate the needs for physical plant…
Feasibility of Summer Employment of Teachers.
ERIC Educational Resources Information Center
Clark County School District, Las Vegas, NV.
A teacher staff of 21 was employed for 6 to 8 weeks during the summers of 1967, 1968, and 1969 at Virgin Valley, Nevada, with funding provided by the Elementary and Secondary Education Act (Title III). The purpose of the study was to determine the feasibility of summer employment for teachers by the school system. Project design called for 3…
ERIC Educational Resources Information Center
Jones, Emily M.; Taliaferro, Andrea R.; Elliott, Eloise M.; Bulger, Sean M.; Kristjansson, Alfgeir L.; Neal, William; Allar, Ishonté
2014-01-01
Increasing rates of childhood obesity has prompted calls for comprehensive approaches to school-based physical activity (PA). The purpose of this study was to evaluate the feasibility of comprehensive school physical activity program (CSPAP) development and related contextual issues within a rural Appalachian county using a Systems Approach. A…
Artemis: Results of the engineering feasibility study
NASA Technical Reports Server (NTRS)
1991-01-01
Information is given in viewgraph form for the Engineering Feasibility Study of the Artemis Project, a plan to establish a permanent base on the Moon. Topics covered include the Common Lunar Lander (CLL), lunar lander engineering study results, lunar lander trajectory analysis, lunar lander conceptual design and mass properties, the lunar lander communication subsystem design, and product assurance.
An algorithm for the split-feasibility problems with application to the split-equality problem.
Chuang, Chih-Sheng; Chen, Chi-Ming
2017-01-01
In this paper, we study the split-feasibility problem in Hilbert spaces by using the projected reflected gradient algorithm. As applications, we study the convex linear inverse problem and the split-equality problem in Hilbert spaces, and we give new algorithms for these problems. Finally, numerical results are given for our main results.
Jutagir, Devika R; Saracino, Rebecca M; Cunningham, Amy; Foran-Tuller, Kelly A; Driscoll, Mary A; Sledge, William H; Emre, Sukru H; Fehon, Dwain C
2018-06-04
Structured, empirically supported psychological interventions are lacking for patients who require organ transplantation. This stage IA psychotherapy development project developed and tested the feasibility, acceptability, tolerability, and preliminary efficacy of an 8-week group cognitive behavioral stress management intervention adapted for patients with end-stage liver disease awaiting liver transplantation. Twenty-nine English-speaking United Network for Organ Sharing-registered patients with end-stage liver disease from a single transplantation center enrolled in 8-week, group cognitive-behavioral liver stress management and relaxation training intervention adapted for patients with end-stage liver disease. Patients completed pre- and postintervention surveys that included the Beck Depression Inventory II and the Beck Anxiety Inventory. Feasibility, acceptability, tolerability, and preliminary efficacy were assessed.ResultAttendance rate was 69.40%. The intervention was rated as "good" to "excellent" by 100% of participants who completed the postintervention survey in teaching them new skills to relax and to cope with stress, and by 94.12% of participants in helping them feel supported while waiting for a liver transplant. No adverse events were recorded over the course of treatment. Attrition was 13.79%. Anxious and depressive symptoms were not statistically different after the intervention.Significance of resultsThe liver stress management and relaxation training intervention is feasible, acceptable, and tolerable to end-stage liver disease patients within a transplant clinic setting. Anxious and depressive symptoms remained stable postintervention. Randomized controlled trials are needed to study the intervention's effectiveness in this population.
Storm water runoff for the Y-12 Plant and selected parking lots
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, E.T.
1996-01-01
A comparison of storm water runoff from the Y-12 Plant and selected employee vehicle parking lots to various industry data is provided in this document. This work is an outgrowth of and part of the continuing Non-Point Source Pollution Elimination Project that was initiated in the late 1980s. This project seeks to identify area pollution sources and remediate these areas through the Resource Conservation and Recovery Act/Comprehensive Environmental Response, Compensation, and Liability Act (RCRA/CERCLA) process as managed by the Environmental Restoration Organization staff. This work is also driven by the Clean Water Act Section 402(p) which, in part, deals withmore » establishing a National Pollutant Discharge Elimination System (NPDES) permit for storm water discharges. Storm water data from events occurring in 1988 through 1991 were analyzed in two reports: Feasibility Study for the Best Management Practices to Control Area Source Pollution Derived from Parking Lots at the DOE Y-12 Plant, September 1992, and Feasibility Study of Best Management Practices for Non-Point Source Pollution Control at the Oak Ridge Y-12 Plant, February 1993. These data consisted of analysis of outfalls discharging to upper East Fork Poplar Creek (EFPC) within the confines of the Y-12 Plant (see Appendixes D and E). These reports identified the major characteristics of concern as copper, iron, lead, manganese, mercury, nitrate (as nitrogen), zinc, biological oxygen demand (BOD), chemical oxygen demand (COD), total suspended solids (TSS), fecal coliform, and aluminum. Specific sources of these contaminants were not identifiable because flows upstream of outfalls were not sampled. In general, many of these contaminants were a concern in many outfalls. Therefore, separate sampling exercises were executed to assist in identifying (or eliminating) specific suspected sources as areas of concern.« less
Feasibility study for mega-electron-volt electron beam tomography.
Hampel, U; Bärtling, Y; Hoppe, D; Kuksanov, N; Fadeev, S; Salimov, R
2012-09-01
Electron beam tomography is a promising imaging modality for the study of fast technical processes. But for many technical objects of interest x rays of several hundreds of keV energy are required to achieve sufficient material penetration. In this article we report on a feasibility study for fast electron beam computed tomography with a 1 MeV electron beam. The experimental setup comprises an electrostatic accelerator with beam optics, transmission target, and a single x-ray detector. We employed an inverse fan-beam tomography approach with radiographic projections being generated from the linearly moving x-ray source. Angular projections were obtained by rotating the object.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-10-01
The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. The report presents the results of a market survey done on products from TOR.
The NAIMS cooperative pilot project: Design, implementation and future directions.
Oh, Jiwon; Bakshi, Rohit; Calabresi, Peter A; Crainiceanu, Ciprian; Henry, Roland G; Nair, Govind; Papinutto, Nico; Constable, R Todd; Reich, Daniel S; Pelletier, Daniel; Rooney, William; Schwartz, Daniel; Tagge, Ian; Shinohara, Russell T; Simon, Jack H; Sicotte, Nancy L
2017-10-01
The North American Imaging in Multiple Sclerosis (NAIMS) Cooperative represents a network of 27 academic centers focused on accelerating the pace of magnetic resonance imaging (MRI) research in multiple sclerosis (MS) through idea exchange and collaboration. Recently, NAIMS completed its first project evaluating the feasibility of implementation and reproducibility of quantitative MRI measures derived from scanning a single MS patient using a high-resolution 3T protocol at seven sites. The results showed the feasibility of utilizing advanced quantitative MRI measures in multicenter studies and demonstrated the importance of careful standardization of scanning protocols, central image processing, and strategies to account for inter-site variability.
Rural jail telepsychiatry: a pilot feasibility study.
Manfredi, Luisa; Shupe, Joann; Batki, Steven L
2005-10-01
New York State has a large rural population, and many of the jails in rural areas have minimal or no psychiatric services available on site. Cost of transport to off-site psychiatric services and the safety issues related to moving inmates from a secure building may limit inmate access to appropriate psychiatric services. This feasibility study describes a project that provided telepsychiatric consultation to increase access to psychiatric treatment in an underserved rural jail in upstate New York. Subjects were consenting jail inmates who requested or were found to be in need of psychiatric care. The project provided interactive two-way audio-video communication between the psychiatrist located in an urban university medical center and subjects who were incarcerated 182 miles away. During the project period, 15 inmates were assessed and treated in 37 consultations. Subjects were predominantly young white males with anxiety, mood, and substance use disorders. Services were readily accepted by inmates and staff. Telepsychiatric examination and treatment appears to be a feasible method to increase access to mental health care in rural jails. Future advocacy for increased mental health services in rural areas in criminal justice setting is likely to depend on further evidence of favorable cost benefit.
Agua Caliente Solar Feasibility and Pre-Development Study Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carolyn T. Stewart, Managing Partner; Red Mountain Energy Partners
2011-04-26
Evaluation of facility- and commercial-scale solar energy projects on the Agua Caliente Band of Cahuilla Indians Reservation in Palm Springs, CA. The Agua Caliente Band of Cahuilla Indians (ACBCI) conducted a feasibility and pre-development study of potential solar projects on its lands in southern California. As described below, this study as a logical and necessary next step for ACBCI. Support for solar project development in California, provided through the statewide California Solar Initiative (CSI), its Renewable Portfolio Standard and Feed-in Tariff Program, and recently announced Reverse Auction Mechanism, provide unprecedented support and incentives that can be utilized by customers ofmore » California's investor-owned utilities. Department of Energy (DOE) Tribal Energy Program funding allowed ACBCI to complete its next logical step to implement its Strategic Energy Plan, consistent with its energy and sustainability goals.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14538-000] Go With the Flow..., Motions To Intervene, and Competing Applications On July 22, 2013, Go with the Flow Hydro Power, LLC...), proposing to study the feasibility of the Go with the Flow Hydroelectric Project (project) to be located on...
Final Report of the Computer Assisted Learning Test Project. Report No. 19.
ERIC Educational Resources Information Center
Van der Drift, K. D.; And Others
A pilot project was conducted to gain information to advise the Board of Directors at the University of Leyden as to the feasibility of using a computerized system to aid in instructional programs in the social sciences, law, medicine, arts, mathematics, and natural sciences at a low cost. The pilot project is divided into four parts which are…
ERIC Educational Resources Information Center
Warner, Paul D.; Clearfield, Frank
The Green Thumb Project was designed to test the feasibility of operating a computerized system for disseminating weather, market, and other agricultural production and management information on a day-to-day basis; to develop a prototype software support system for the test; and to provide essential project information on conduct of the test to…
Early Identification of SE-Related Program Risks
2009-09-30
development of feasibility evidence for a 100-KSLOC project . It is good to note that the “sweet spots” are... models , or experiments with planned technologies and increasingly detailed analysis of development approaches and project productivity rates. The ...incomplete without the FED, it becomes a first-class project deliverable. This implies that it needs a plan for its development , and that each task
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
... an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Igiugig RISEC Water Power Project (Igiugig Project or project), to... proposed transmission line that will either connect directly to the IVC diesel power plant or a 1,000-foot...
ERIC Educational Resources Information Center
Veaner, Allen B.
Project BALLOTS is a large-scale library automation development project of the Stanford University Libraries which has demonstrated the feasibility of conducting on-line interactive searches of complex bibliographic files, with a large number of users working simultaneously in the same or different files. This report documents the continuing…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... to study the feasibility of the Mississippi Lock and Dam No. 18 Water Power Project (L&D 18 Project... Project would consist of: (1) Twenty-four very-low-head turbine-generator units that would have a... reinforced concrete structure enclosing the turbine-generator units and having a top of deck elevation of 528...
A financing model to solve financial barriers for implementing green building projects.
Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.
A Financing Model to Solve Financial Barriers for Implementing Green Building Projects
Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379
Case Study of The ARRA-Funded GSHP Demonstration at the Natural Sources Building, Montana Tech
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malhotra, Mini; Liu, Xiaobing
Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use watermore » in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an aircooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally, limitations in conducting the analysis are identified and recommendations for improvement in the control and operation of such systems are made.« less
Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-08-01
The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harpole, K.J.; Hill, C.J.
1983-02-01
A review of the performance of the North Stanley Polymer Demonstration Project has been completed. The objective of the cost-project was to evaluate the technical efficiency and economic feasibility of polymer-enhanced waterflooding as a tertiary recovery process in a highly heterogeneous and vertically fractured sandstone reservoir that has been successfully waterflooded and is approaching the economic limits of conventional waterflooding recovery. The ultimate incremental oil recovery from the project is estimated to be about 570,000 barrels (or approximately 1.4% of the original oil-in-place). This is significantly less than the original recovery predictions but does demonstrate that the project was technicallymore » successful. The lower-than-anticipated recovery is attributed principally to the extremely heterogeneous nature of the reservoir. One of the major objectives of this evaluation is to present an updated economic anlaysis of the North Stanley Polymer Demonstration Project. The updated economic analysis under current (mid-1982) economic conditions indicates that the North Stanley project would be commercially feasible if polymer injection had begun in 1982, rather than in 1976. Overall project operations were conducted efficiently, with a minimum of operational problems. The North Stanley polymer project provides a well-documented example of an actual field-scale tertiary application of polymer-augmented waterflooding in a highly heterogeneous reservoir.« less
Manufacturing Education Curriculum Project.
ERIC Educational Resources Information Center
Umstattd, William D.
The Manufacturing Education Curriculum Project's feasibility study concerned with industrial arts curriculum development in manufacturing for the senior high school level is described. The need for an industrial arts curriculum which meets and reflects present and future trends is discussed in the introduction, followed by a review of the…
Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations
DOT National Transportation Integrated Search
2000-02-01
The purpose of this project is to summarize the results of the research project that explored the use of portable traffic signal technology as a means for improving the efficiency of two-lane rural maintenance operations. The research findings are ba...
SPREADING LAGOONED SEWAGE SLUDGE ON FARMLAND: A CASE HISTORY
This project demonstrated that land application is feasible and practical for a metropolitan treatment plant for disposal of a large volume (265,000 cu m) of stabilized, liquid sewage sludge stored in lagoons. The project involved transportation of sludge by semi-trailer tankers ...
Multilevel Assessments of Science Standards
ERIC Educational Resources Information Center
Quellmalz, Edys S.; Timms, Michael J.; Silberglitt, Matt D.
2011-01-01
The Multilevel Assessment of Science Standards (MASS) project is creating a new generation of technology-enhanced formative assessments that bring the best formative assessment practices into classrooms to transform what, how, when, and where science learning is assessed. The project is investigating the feasibility, utility, technical quality,…
Use of evidence to support healthy public policy: a policy effectiveness–feasibility loop
Bowman, Sarah; Critchley, Julia; Capewell, Simon; Husseini, Abdullatif; Maziak, Wasim; Zaman, Shahaduz; Ben Romdhane, Habiba; Fouad, Fouad; Phillimore, Peter; Unal, Belgin; Khatib, Rana; Shoaibi, Azza; Ahmad, Balsam
2012-01-01
Abstract Public policy plays a key role in improving population health and in the control of diseases, including non-communicable diseases. However, an evidence-based approach to formulating healthy public policy has been difficult to implement, partly on account of barriers that hinder integrated work between researchers and policy-makers. This paper describes a “policy effectiveness–feasibility loop” (PEFL) that brings together epidemiological modelling, local situation analysis and option appraisal to foster collaboration between researchers and policy-makers. Epidemiological modelling explores the determinants of trends in disease and the potential health benefits of modifying them. Situation analysis investigates the current conceptualization of policy, the level of policy awareness and commitment among key stakeholders, and what actually happens in practice, thereby helping to identify policy gaps. Option appraisal integrates epidemiological modelling and situation analysis to investigate the feasibility, costs and likely health benefits of various policy options. The authors illustrate how PEFL was used in a project to inform public policy for the prevention of cardiovascular diseases and diabetes in four parts of the eastern Mediterranean. They conclude that PEFL may offer a useful framework for researchers and policy-makers to successfully work together to generate evidence-based policy, and they encourage further evaluation of this approach. PMID:23226897
High altitude reconnaissance aircraft
NASA Technical Reports Server (NTRS)
Yazdo, Renee Anna; Moller, David
1990-01-01
At the equator the ozone layer ranges from 65,000 to 130,000 plus feet, which is beyond the capabilities of the ER-2, NASA's current high altitude reconnaissance aircraft. The Universities Space Research Association, in cooperation with NASA, is sponsoring an undergraduate program which is geared to designing an aircraft that can study the ozone layer at the equator. This aircraft must be able to cruise at 130,000 feet for six hours at Mach 0.7, while carrying 3,000 lbs. of payload. In addition, the aircraft must have a minimum range of 6,000 miles. In consideration of the novel nature of this project, the pilot must be able to take control in the event of unforeseen difficulties. Three aircraft configurations were determined to be the most suitable - a joined-wing, a biplane, and a twin-boom conventional airplane. The performance of each configuration was analyzed to investigate the feasibility of the project.
Physical and cognitive stimulation in Alzheimer Disease. the GAIA Project: a pilot study.
Maci, Tiziana; Pira, Francesco Le; Quattrocchi, Graziella; Nuovo, Santo Di; Perciavalle, Vincenzo; Zappia, Mario
2012-03-01
Several data suggest that physical activity and cognitive stimulation have a positive effect on the quality of life (QoL) of people with Alzheimer's disease (AD), slowing the decline due to the disease. A pilot project was undertaken to assess the effect of cognitive stimulation, physical activity, and socialization on patients with AD and their informal caregiver's QoL and mood. Fourteen patients with AD were randomly divided into active treatment group and control group. At the end of treatment, a significant improvement in apathy, anxiety, depression, and QoL in the active treatment group was found. Considering caregivers, those of the active treatment group exhibited a significant improvement in their mood and in their perception of patients' QoL. This study provides evidence that a combined approach based on cognitive stimulation, physical activity, and socialization is a feasible tool to improve mood and QoL in patients with AD and their caregivers.
Mallory, Michael J.; Swain, Lindsay A.; Tyley, Stephen J.
1980-01-01
This report presents a preliminary evaluation of the geohydrologic factors affecting storage of water by artificial recharge in the upper Coachella Valley, Calif. The ground-water basin of the upper Coachella Valley seems to be geologically suitable for large-scale artificial recharge. A minimum of 900 ,000 acre-feet of water could probably be stored in the basin without raising basinwide water levels above those that existed in 1945. Preliminary tests indicate that a long-term artificial recharge rate of 5 feet per day may be feasible for spreading grounds in the basin if such factors as sediment and bacterial clogging can be controlled. The California Department of Water Resources, through the Future Water Supply Program, is investigating the use of ground-water basins for storage of State Water Project water in order to help meet maximum annual entitlements to water project contractors. (USGS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holt, V.L.; Baron, L.A.
1994-05-01
This report provides specific details and requirements for the WAG 2 remedial investigation and site investigation Ecological Assessment Task, Kingfisher Study, including information that will contribute to safe completion of the project. The report includes historical background; a site map; project organization; task descriptions and hazard evaluations; controls; and monitoring, personal protective equipment, decontamination, and medical surveillance program requirements. The report also includes descriptions of site personnel and their certifications as well as suspected WAG 2 contaminants and their characteristics. The primary objective of the WAG 2 Kingfisher Study is to assess the feasibility of using kingfishers as biological monitorsmore » of contaminants on the Oak Ridge Reservation (ORR). Kingfisher sample collection will be used to determine the levels of contaminants and degree of bioaccumulation within a common piscivorous bird feeding on contaminated fish from streams on the ORR.« less
Inoue, Ken-ichi; Takada, Masahiko; Matsumoto, Masayuki
2015-01-01
Optogenetics enables temporally and spatially precise control of neuronal activity in vivo. One of the key advantages of optogenetics is that it can be used to control the activity of targeted neural pathways that connect specific brain regions. While such pathway-selective optogenetic control is a popular tool in rodents, attempts at modulating behaviour using pathway-selective optogenetics have not yet been successful in primates. Here we develop a methodology for pathway-selective optogenetics in macaque monkeys, focusing on the pathway from the frontal eye field (FEF) to the superior colliculus (SC), part of the complex oculomotor network. We find that the optogenetic stimulation of FEF projections to the SC modulates SC neuron activity and is sufficient to evoke saccadic eye movements towards the response field corresponding to the stimulation site. Thus, our results demonstrate the feasibility of using pathway-selective optogenetics to elucidate neural network function in primates. PMID:26387804
Paying for the Medicare program.
Munnell, A H
1985-01-01
Although the hospital insurance (HI) trust fund acted as a source of strength for the old-age, survivors, and disability insurance program during its recent financial crises, projections by HCFA and CBO reveal that the Medicare program will experience financing problems of its own within the next decade. No one would argue that Medicare's financing problems should be solved simply by raising more money. However, the prospect of insolvency in the HI trust fund and the increasing strain on general revenues from the Supplementary Medical Insurance trust fund require policymakers to survey the options for increasing Medicare revenues while cost-control devices are being developed. Indeed, even if cost-control efforts are completely successful, additional revenues may be needed in the future to finance new initiatives in the Medicare program. Therefore, this paper will look briefly at current efforts to regain control of soaring hospital and physician costs and then examine some of the more feasible options for increasing Medicare revenues.
Inoue, Ken-ichi; Takada, Masahiko; Matsumoto, Masayuki
2015-09-21
Optogenetics enables temporally and spatially precise control of neuronal activity in vivo. One of the key advantages of optogenetics is that it can be used to control the activity of targeted neural pathways that connect specific brain regions. While such pathway-selective optogenetic control is a popular tool in rodents, attempts at modulating behaviour using pathway-selective optogenetics have not yet been successful in primates. Here we develop a methodology for pathway-selective optogenetics in macaque monkeys, focusing on the pathway from the frontal eye field (FEF) to the superior colliculus (SC), part of the complex oculomotor network. We find that the optogenetic stimulation of FEF projections to the SC modulates SC neuron activity and is sufficient to evoke saccadic eye movements towards the response field corresponding to the stimulation site. Thus, our results demonstrate the feasibility of using pathway-selective optogenetics to elucidate neural network function in primates.
Control of helicopter rotorblade aerodynamics
NASA Technical Reports Server (NTRS)
Fabunmi, James A.
1991-01-01
The results of a feasibility study of a method for controlling the aerodynamics of helicopter rotorblades using stacks of piezoelectric ceramic plates are presented. A resonant mechanism is proposed for the amplification of the displacements produced by the stack. This motion is then converted into linear displacement for the actuation of the servoflap of the blades. A design which emulates the actuation of the servoflap on the Kaman SH-2F is used to demonstrate the fact that such a system can be designed to produce the necessary forces and velocities needed to control the aerodynamics of the rotorblades of such a helicopter. Estimates of the electrical power requirements are also presented. A Small Business Innovation Research (SBIR) Phase 2 Program is suggested, whereby a bench-top prototype of the device can be built and tested. A collaborative effort between AEDAR Corporation and Kaman Aerospace Corporation is anticipated for future effort on this project.
Shared mission operations concept
NASA Technical Reports Server (NTRS)
Spradlin, Gary L.; Rudd, Richard P.; Linick, Susan H.
1994-01-01
Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.
Preliminary design of nine high speed civil transports
NASA Technical Reports Server (NTRS)
Sandlin, Doral; Vantriet, Robert; Soban, Dani; Hoang, TY
1992-01-01
Sixty senior design students at Cal Poly, SLO have completed a year-long project to design the next generation of High Speed Civil Transports (HSCT). The design process was divided up into three distinct phases. The first third of the project was devoted entirely to research into the special problems associated with an HSCT. These included economic viability, airport compatibility, high speed aerodynamics, sonic boom minimization, environmental impact, and structures and materials. The result of this research was the development of nine separate Requests for Proposal (RFP) that outlined reasonable yet challenging design criteria for the aircraft. All were designed to be technically feasible in the year 2015. The next phase of the project divided the sixty students into nine design groups. Each group, with its own RFP, completed a Class 1 preliminary design of an HSCT. The nine configurations varied from conventional double deltas to variable geometry wings to a pivoting oblique wing design. The final phase of the project included a more detailed Class 2 sizing as well as performance and stability and control analysis. Cal Poly, San Luis Obispo presents nine unique solutions to the same problem: that of designing an economically viable, environmentally acceptable, safe and comfortable supersonic transport.
The scientific programme between ESRO and ESA: Choosing new projects (1973-1977)
NASA Astrophysics Data System (ADS)
Russo, Arturo
1995-02-01
The ESA History Study Reports are preliminary reports of studies carried out within the framework of an ESA (European Space Agency) contract. They will form the basis of a comprehensive study of European Space activities covering the period 1959-1987. The transformation of ESRO (European Space Research Organization) into ESA found the Organization's bodies involved in a new round of the decision-making process to select future scientific satellite projects. In this report, the three main phases of the decision-making process are discussed. The first, from June 1973 to April 1974, the European scientific community and their representatives in ESA's advisory committee structure were invited to agree on a set of space missions for which a definition study was recommended. At the end of this phase, thirteen missions were selected for such a definition study by ESRO's Scientific Program Board (SPB). The second phase covers the period from that decision up to March 1975, when a much more important decision was required, namely to select a restricted number of missions for which a feasibility study was to be performed. The aims of such feasibility studies were to establish the technical and financial feasibility of each project, to propose a well-defined project concept, to identify the research and technology effort required to support it, and to state a preliminary cost estimate to completion. The third phase covers the first two years of the new Agency's life, and concludes with the selection of the projects to be adopted in ESA's scientific program.
Point spread function modeling and image restoration for cone-beam CT
NASA Astrophysics Data System (ADS)
Zhang, Hua; Huang, Kui-Dong; Shi, Yi-Kai; Xu, Zhe
2015-03-01
X-ray cone-beam computed tomography (CT) has such notable features as high efficiency and precision, and is widely used in the fields of medical imaging and industrial non-destructive testing, but the inherent imaging degradation reduces the quality of CT images. Aimed at the problems of projection image degradation and restoration in cone-beam CT, a point spread function (PSF) modeling method is proposed first. The general PSF model of cone-beam CT is established, and based on it, the PSF under arbitrary scanning conditions can be calculated directly for projection image restoration without the additional measurement, which greatly improved the application convenience of cone-beam CT. Secondly, a projection image restoration algorithm based on pre-filtering and pre-segmentation is proposed, which can make the edge contours in projection images and slice images clearer after restoration, and control the noise in the equivalent level to the original images. Finally, the experiments verified the feasibility and effectiveness of the proposed methods. Supported by National Science and Technology Major Project of the Ministry of Industry and Information Technology of China (2012ZX04007021), Young Scientists Fund of National Natural Science Foundation of China (51105315), Natural Science Basic Research Program of Shaanxi Province of China (2013JM7003) and Northwestern Polytechnical University Foundation for Fundamental Research (JC20120226, 3102014KYJD022)
Bonell, Chris; Fletcher, Adam; Fitzgerald-Yau, Natasha; Hale, Daniel; Allen, Elizabeth; Elbourne, Diana; Jones, Rebecca; Bond, Lyndal; Wiggins, Meg; Miners, Alec; Legood, Rosa; Scott, Stephen; Christie, Deborah; Viner, Russell
2015-07-01
Youth bullying and other aggressive behaviours are a major public health concern owing to their impact on adolescent physical and mental health and well-being. Whole-school restorative approaches have been identified as a promising method of addressing aggressive behaviour but there have been no randomised trials undertaken to examine their effects. To examine the feasibility and acceptability of implementing and trialling the INCLUSIVE (initiating change locally in bullying and aggression through the school environment) intervention in English secondary schools. Cluster randomised controlled pilot trial in eight schools (1 : 1 computer-generated random allocation post baseline by a statistician blind to the identity of clusters) and process evaluation. Secondary schools in England (purposively sampled to ensure diversity). Year 8 students (aged 12-13 years), teachers, other school staff and intervention providers. Whole-school restorative approach to address bullying and aggression, involving the following standard processes: school action group formation and external facilitation to review needs assessment data, identify priorities, and plan and monitor school-level actions; staff training in restorative practices; and a new social and emotional skills curriculum. Standard practice. (1) The primary outcome of interest was the feasibility and acceptability of delivering and trialling the intervention according to prespecified criteria; (2) process data were analysed to explore participants' experiences of implementing and trialling the intervention and how these varied according to school context; and (3) indicative primary outcomes (aggressive behaviour measures), secondary outcomes, intermediate outcomes and economic evaluation methods were piloted. Students (n = 1144 baseline; n = 1114 follow-up) and teachers (n = 387 baseline; n = 336 follow-up) were surveyed at the start and end of the 2011-12 academic year (baseline September 2011; follow-up June-July 2012). A total of 1017 students surveyed at baseline remained in the study at follow-up (89%). Other quantitative data were collected via intervention provider checklists (n = 4) and action group surveys (n = 44); qualitative data were collected via interviews (n = 34), focus groups (n = 20) and observations of action group meetings (n = 16). (1) All prespecified feasibility and acceptability criteria were met. (2) Qualitative data indicated that all intervention components and the trial design were feasible and acceptable to students and staff, including in more disadvantaged school contexts. Qualitative data also suggested that student participation may be a core component in improving relationships and engagement across the school. The later-than-planned project start (July) and the timing of the baseline surveys (September), which needed to be completed pre allocation, caused delays in launching the intervention, staff training and other intervention outputs. (3) Three pilot primary outcomes were examined (completion rate at follow-up range: 91.7-94.2%) and the Gatehouse Bullying Scale and the Edinburgh Study of Youth Transitions and Crime school misbehaviour subscale were acceptable, discriminating and reliable measures of bullying and aggression in this context. Our pilot economic analyses support the use of the Child Health Utility 9D scale with this population and the feasibility of cost-utility analysis, although this should be supplemented with a cost-consequence analysis. There was no evidence of harm. It is feasible and acceptable to implement and trial the INCLUSIVE intervention in English secondary schools, although a longer lead-in time is required to enable timely intervention outputs to occur. A Phase III cluster randomised controlled trial is required to examine the effectiveness and cost-effectiveness over a 3-year period of implementation for reducing aggressive behaviours, promoting mental health and well-being, and reducing health inequalities. Current Controlled Trials ISRCTN88527078. The National Institute for Health Research Health Technology Assessment programme (research), the Paul Hamlyn Foundation, the Big Lottery Fund and the Coutts Charitable Trust (intervention). The report will be published in full in Health Technology Assessment; Vol. 19, No. 53. See the NIHR Journals Library website for further project information.
Cape Blanco wind farm feasibility study
NASA Astrophysics Data System (ADS)
1987-11-01
The Cape Blanco Wind Farm (CBWF) Feasibility Study was undertaken as a prototype for determining the feasibility of proposals for wind energy projects at Northwest sites. It was intended to test for conditions under which wind generation of electricity could be commercially feasible, not by another abstract survey of alternative technologies, but rather through a site-specific, machine-specific analysis of one proposal. Some of the study findings would be most pertinent to the Cape Blanco site - local problems require local solutions. Other findings would be readily applicable to other sites and other machines, and study methodologies would be designed to be modified for appraisal of other proposals. This volume discusses environmental, economic, and technical issues of the Wind Farm.
7 CFR 1709.117 - Application requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... project including target community, goals, tasks to be completed and other relevant information that... to support a finding of technical feasibility; (ii) Identify the major tasks to be performed and a proposed timeline for completion of each task; and (iii) Identify the location of the project target area...
50 CFR 253.14 - Economic and financial requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Economic and financial requirements. 253... Obligation Guarantee Program § 253.14 Economic and financial requirements. (a) Income and expense projections... project's economic, technical, or financial feasibility. The Division will select and employ the necessary...
Code of Federal Regulations, 2011 CFR
2011-04-01
... aid States in repairing road facilities which have suffered widespread serious damage resulting from a... feasible, the cost of permanent restoration work. (d) The approval to use available ER funds to repair or... over non-emergency work. (h) ER projects shall be promptly constructed. Any project that has not...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-27
... study the feasibility of the Half Moon Cove Tidal Power Plant Project to be located in Half Moon Cove.... The proposed project would consist of: (1) The existing 544-acre Half Moon Cove; (2) a new 410-foot...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2014 CFR
2014-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2013 CFR
2013-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2012 CFR
2012-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
The Prison Project: A Proposed Model for a Clinical Course
ERIC Educational Resources Information Center
Macey, Nora Lafley; And Others
1977-01-01
During the 1973-74 school year 10 law students taught a course in criminal law and prisoners' rights to interested inmates at the Indiana Women's Prison. Experiences of the Prison Project are described and its feasibility as a clinical course with credit is suggested. (LBH)
Project 0-6749 : feasibility study of two-lift concrete paving : [project summary].
DOT National Transportation Integrated Search
2013-08-01
Two-lift concrete paving (2LCP) involves placing two layers of : concrete (wet-on-wet) instead of a single homogeneous layer, as is : typically done in the United States. 2LCP offers the opportunity to optimize the use of local aggregates and : recyc...
DOT National Transportation Integrated Search
2004-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
7 CFR 1703.135 - Application selection provisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... based on availability of funds, the financial feasibility of the project in accordance with § 1703.134(d), the services to be provided which demonstrate that the project meets the general requirements of this..., DEPARTMENT OF AGRICULTURE RURAL DEVELOPMENT Distance Learning and Telemedicine Combination Loan and Grant...
DOT National Transportation Integrated Search
1998-01-08
The CVISN Pilot Project will prototype the use of a comprehensive interface to state and federal motor carrier data systems and will deliver real-time, decision-making information to weigh stations and commercial vehicle enforcement officers. In addi...
ERIC Educational Resources Information Center
Melton, Bridget F.; Bigham, Lauren E.; Bland, Helen W.
2013-01-01
The purpose of this research was to evaluate the feasibility of an ecological momentary assessment (EMA) technique in a health behavior change intervention offered within university general health courses. A six-week health behavior change project was used with two groups: video journaling and traditional (pencil and paper) group. Research…
ERIC Educational Resources Information Center
Chacko, Mariam R.; Markham, Christine; Thiel, Melanie; Crandall, Stacy M.; Peskin, Melissa F.; Shegog, Ross; Tortolero, Susan
2014-01-01
Background: This study examined the acceptability and feasibility of using a biological outcome measure to evaluate a school-based sexuality education program. Confidential field-delivered sexually transmitted infection (STI) testing by nonmedical field staff and STI treatment by medically trained field staff was assessed in off-campus and…
ERIC Educational Resources Information Center
Knol, Linda L.; Myers, Harriet H.; Black, Sheila; Robinson, Darlene; Awololo, Yawah; Clark, Debra; Parker, Carson L.; Douglas, Joy W.; Higginbotham, John C.
2016-01-01
Background: Effective childhood obesity prevention programs for preschool children are limited in number and focus on changes in the child care environment rather than the home environment. Purpose: The purpose of this project was to develop and test the feasibility of a home environment obesity prevention program that incorporates mindful eating…
ERIC Educational Resources Information Center
Urban Inst., Washington, DC.
This last of a three-volume report of a study done to assess the feasibility of large-scale, countercyclical public job creation covers the findings regarding the priorities among projects, indirect employment effects, skill imbalances, and administrative issues; and summarizes the overall findings, conclusions, and recommendations. (Volume 1,…
ERIC Educational Resources Information Center
Cohen, Albert; Orzech, David
This project explored the feasibility for vocational rehabilitation of a perplexing group of patients awaiting separation from a state mental hospital. The patients were of dubious employability. The design was a series of sequential stages through which the 98 workshop participants passed, with attrition taking place at each stage. The program…
Feasibility Analysis For Heating Tribal Buildings with Biomass
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steve Clairmont; Micky Bourdon; Tom Roche
2009-03-03
This report provides a feasibility study for the heating of Tribal buildings using woody biomass. The study was conducted for the Confederated Salish and Kootenai Tribes of the Flathead Reservation in western Montana. S&K Holding Company and TP Roche Company completed the study and worked together to provide the final report. This project was funded by the DOE's Tribal Energy Program.
ERIC Educational Resources Information Center
Moroney, Jillian; Laninga, Tamara; Brooks, Randall
2016-01-01
The Northwest Advanced Renewables Alliance (NARA) is examining the feasibility of a woody biomass-to-biofuels supply chain in Idaho, Montana, Oregon, and Washington. A part of the ongoing feasibility study involved conducting a survey of informed stakeholders on the use of woody biomass from forest residuals in producing sustainable bioenergy.…
ERIC Educational Resources Information Center
Carpenter, Erika M.; Frankel, Fred; Marina, Michael; Duan, Naihua; Smalley, Susan L.
2004-01-01
The present study examines the feasibility of Internet delivery of a Parent-Adolescent Conflict Training (PACT) program to families with an ADHD teen. The goals of the project are to ascertain the willingness of families to participate in this web-based study, identify relevant issues related to confidentiality of Internet data collection, and…
ERIC Educational Resources Information Center
BavaHarji, Madhubala; Letchumanan, Krishnaveni; Bhar, Sareen Kaur
2014-01-01
This paper presents a feasible framework for building bridges between schools and homes to develop five year olds ESL literacy skills, using storybooks as a springboard. A reading program, i.e. Smart Partnership in Reading in English (SPIRE) was designed in response to the government's aspiration to raise literacy rates to 100% by 2020 and the…
First Trial of Real-time Poloidal Beta Control in KSTAR
NASA Astrophysics Data System (ADS)
Han, Hyunsun; Hahn, S. H.; Bak, J. G.; Walker, M. L.; Woo, M. H.; Kim, J. S.; Kim, Y. J.; Bae, Y. S.; KSTAR Team
2014-10-01
Sustaining the plasma in a stable and a high performance condition is one of the important control issues for future steady state tokamaks. In the 2014 KSTAR campaign, we have developed a real-time poloidal beta (βp) control technique and carried out preliminary experiments to identify its feasibility. In the control system, the βp is calculated in real time using the measured diamagnetic loop signal (DLM03) with coil pickup corrections, and compared with the target value leading to the change of the neutral beam (NB) heating power using a feedback PID control algorithm. To match the required power of NB which is operated with constant voltage, the duty cycles of the modulation were adjusted as the ratio of the required power to the maximum achievable one. This paper will present the overall procedures of the βp control, the βp estimation process implemented in the plasma control system, and the analysis on the preliminary experimental results. This work is supported by the KSTAR research project funded by the Ministry of Science, ICT & Future Planning of Korea.
Technology transfer: Imaging tracker to robotic controller
NASA Technical Reports Server (NTRS)
Otaguro, M. S.; Kesler, L. O.; Land, Ken; Erwin, Harry; Rhoades, Don
1988-01-01
The transformation of an imaging tracker to a robotic controller is described. A multimode tracker was developed for fire and forget missile systems. The tracker locks on to target images within an acquisition window using multiple image tracking algorithms to provide guidance commands to missile control systems. This basic tracker technology is used with the addition of a ranging algorithm based on sizing a cooperative target to perform autonomous guidance and control of a platform for an Advanced Development Project on automation and robotics. A ranging tracker is required to provide the positioning necessary for robotic control. A simple functional demonstration of the feasibility of this approach was performed and described. More realistic demonstrations are under way at NASA-JSC. In particular, this modified tracker, or robotic controller, will be used to autonomously guide the Man Maneuvering Unit (MMU) to targets such as disabled astronauts or tools as part of the EVA Retriever efforts. It will also be used to control the orbiter's Remote Manipulator Systems (RMS) in autonomous approach and positioning demonstrations. These efforts will also be discussed.
NASA Astrophysics Data System (ADS)
Akioka, M.; Orikasa, T.; Satoh, M.; Miura, A.; Tsuji, H.; Toyoshima, M.; Fujino, Y.
2016-06-01
Satellite for next generation mobile satellite communication service with small personal terminal requires onboard antenna with very large aperture reflector larger than twenty meters diameter because small personal terminal with lower power consumption in ground base requires the large onboard reflector with high antenna gain. But, large deployable antenna will deform in orbit because the antenna is not a solid dish but the flexible structure with fine cable and mesh supported by truss. Deformation of reflector shape deteriorate the antenna performance and quality and stability of communication service. However, in case of digital beam forming antenna with phased array can modify the antenna beam performance due to adjustment of excitation amplitude and excitation phase. If we can measure the reflector shape precisely in orbit, beam pattern and antenna performance can be compensated with the updated excitation amplitude and excitation phase parameters optimized for the reflector shape measured every moment. Softbank Corporation and National Institute of Information and Communications Technology has started the project "R&D on dynamic beam control technique for next generation mobile communication satellite" as a contracted research project sponsored by Ministry of Internal Affairs and Communication of Japan. In this topic, one of the problem in vision metrology application is a strong constraints on geometry for camera arrangement on satellite bus with very limited space. On satellite in orbit, we cannot take many images from many different directions as ordinary vision metrology measurement and the available area for camera positioning is quite limited. Feasibility of vision metrology application and general methodology to apply to future mobile satellite communication satellite is to be found. Our approach is as follows: 1) Development of prototyping simulator to evaluate the expected precision for network design in zero order and first order 2) Trial measurement for large structure with similar dimension with large deployable reflector to confirm the validity of the network design and instrumentation. In this report, the overview of this R&D project and the results of feasibility study of network design based on simulations on vision metrology and beam pattern compensation of antenna with very large reflector in orbit is discussed. The feasibility of assumed network design for vision metrology and satisfaction of accuracy requirements are discussed. The feasibility of beam pattern compensation by using accurately measured reflector shape is confirmed with antenna pattern simulation for deformed parabola reflector. If reflector surface of communication satellite can be measured routinely in orbit, the antenna pattern can be compensated and maintain the high performance every moment.
Development and Demonstration of an Ada Test Generation System
NASA Technical Reports Server (NTRS)
1996-01-01
In this project we have built a prototype system that performs Feasible Path Analysis on Ada programs: given a description of a set of control flow paths through a procedure, and a predicate at a program point feasible path analysis determines if there is input data which causes execution to flow down some path in the collection reaching the point so that tile predicate is true. Feasible path analysis can be applied to program testing, program slicing, array bounds checking, and other forms of anomaly checking. FPA is central to most applications of program analysis. But, because this problem is formally unsolvable, syntactic-based approximations are used in its place. For example, in dead-code analysis the problem is to determine if there are any input values which cause execution to reach a specified program point. Instead an approximation to this problem is computed: determine whether there is a control flow path from the start of the program to the point. This syntactic approximation is efficiently computable and conservative: if there is no such path the program point is clearly unreachable, but if there is such a path, the analysis is inconclusive, and the code is assumed to be live. Such conservative analysis too often yields unsatisfactory results because the approximation is too weak. As another example, consider data flow analysis. A du-pair is a pair of program points such that the first point is a definition of a variable and the second point a use and for which there exists a definition-free path from the definition to the use. The sharper, semantic definition of a du-pair requires that there be a feasible definition-free path from the definition to the use. A compiler using du-pairs for detecting dead variables may miss optimizations by not considering feasibility. Similarly, a program analyzer computing program slices to merge parallel versions may report conflicts where none exist. In the context of software testing, feasibility analysis plays an important role in identifying testing requirements which are infeasible. This is especially true for data flow testing and modified condition/decision coverage. Our system uses in an essential way symbolic analysis and theorem proving technology, and we believe this work represents one of the few successful uses of a theorem prover working in a completely automatic fashion to solve a problem of practical interest. We believe this work anticipates an important trend away from purely syntactic-based methods for program analysis to semantic methods based on symbolic processing and inference technology. Other results demonstrating the practical use of automatic inference is being reported in hardware verification, although there are significant differences between the hardware work and ours. However, what is common and important is that general purpose theorem provers are being integrated with more special-purpose decision procedures to solve problems in analysis and verification. We are pursuina commercial opportunities for this work, and will use and extend the work in other projects we are engaged in. Ultimately we would like to rework the system to analyze C, C++, or Java as a key step toward commercialization.
Beidas, Rinad S; Becker-Haimes, Emily M; Adams, Danielle R; Skriner, Laura; Stewart, Rebecca E; Wolk, Courtney Benjamin; Buttenheim, Alison M; Williams, Nathaniel J; Inacker, Patricia; Richey, Elizabeth; Marcus, Steven C
2017-12-15
Informed by our prior work indicating that therapists do not feel recognized or rewarded for implementation of evidence-based practices, we tested the feasibility and acceptability of two incentive-based implementation strategies that seek to improve therapist adherence to cognitive-behavioral therapy for youth, an evidence-based practice. This study was conducted over 6 weeks in two community mental health agencies with therapists (n = 11) and leaders (n = 4). Therapists were randomized to receive either a financial or social incentive if they achieved a predetermined criterion on adherence to cognitive-behavioral therapy. In the first intervention period (block 1; 2 weeks), therapists received the reward they were initially randomized to if they achieved criterion. In the second intervention period (block 2; 2 weeks), therapists received both rewards if they achieved criterion. Therapists recorded 41 sessions across 15 unique clients over the project period. Primary outcomes included feasibility and acceptability. Feasibility was assessed quantitatively. Fifteen semi-structured interviews were conducted with therapists and leaders to assess acceptability. Difference in therapist adherence by condition was examined as an exploratory outcome. Adherence ratings were ascertained using an established and validated observational coding system of cognitive-behavioral therapy. Both implementation strategies were feasible and acceptable-however, modifications to study design for the larger trial will be necessary based on participant feedback. With respect to our exploratory analysis, we found a trend suggesting the financial reward may have had a more robust effect on therapist adherence than the social reward. Incentive-based implementation strategies can be feasibly administered in community mental health agencies with good acceptability, although iterative pilot work is essential. Larger, fully powered trials are needed to compare the effectiveness of implementation strategies to incentivize and enhance therapists' adherence to evidence-based practices such as cognitive-behavioral therapy.
Investigation of system integration methods for bubble domain flight recorders
NASA Technical Reports Server (NTRS)
Chen, T. T.; Bohning, O. D.
1975-01-01
System integration methods for bubble domain flight records are investigated. Bubble memory module packaging and assembly, the control electronics design and construction, field coils, and permanent magnet bias structure design are studied. A small 60-k bit engineering model was built and tested to demonstrate the feasibility of the bubble recorder. Based on the various studies performed, a projection is made on a 50,000,000-bit prototype recorder. It is estimated that the recorder will occupy 190 cubic in., weigh 12 lb, and consume 12 w power when all of its four tracks are operated in parallel at 150 kHz data rate.
Reuse fo a Cold War Surveillance Drone to Flight Test a NASA Rocket Based Combined Cycle Engine
NASA Technical Reports Server (NTRS)
Brown, T. M.; Smith, Norm
1999-01-01
Plans for and early feasibility investigations into the modification of a Lockheed D21B drone to flight test the DRACO Rocket Based Combined Cycle (RBCC) engine are discussed. Modifications include the addition of oxidizer tanks, modern avionics systems, actuators, and a vehicle recovery system. Current study results indicate that the D21B is a suitable candidate for this application and will allow demonstrations of all DRACO engine operating modes at Mach numbers between 0.8 and 4.0. Higher Mach numbers may be achieved with more extensive modification. Possible project risks include low speed stability and control, and recovery techniques.
NASA Technical Reports Server (NTRS)
Leach, Ronald J.
1997-01-01
The purpose of this project was to study the feasibility of reusing major components of a software system that had been used to control the operations of a spacecraft launched in the 1980s. The study was done in the context of a ground data processing system that was to be rehosted from a large mainframe to an inexpensive workstation. The study concluded that a systematic approach using inexpensive tools could aid in the reengineering process by identifying a set of certified reusable components. The study also developed procedures for determining duplicate versions of software, which were created because of inadequate naming conventions. Such procedures reduced reengineering costs by approximately 19.4 percent.