7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2013 CFR
2013-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2014 CFR
2014-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
7 CFR 4280.173 - Grant funding for feasibility studies.
Code of Federal Regulations, 2012 CFR
2012-01-01
... costs will be considered eligible. Eligible project costs for renewable energy system feasibility... America Program General Renewable Energy System Feasibility Study Grants § 4280.173 Grant funding for...; and (3) Environmental study. (c) Ineligible project costs. Ineligible project costs for renewable...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Jennifer
The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownershipmore » for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.« less
7 CFR 4280.21 - Eligible REDG Ultimate Recipients and Projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... facilitate medical or educational services or job training; or (6) Project feasibility studies and Technical Assistance. A qualified Independent Provider must perform feasibility studies or Technical Assistance. (b...
Final Technical Report: Renewable Energy Feasibility Study and Resources Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivero, Mariah
In March 2011, the U.S. Department of Energy (DOE) awarded White Pine County, Nevada, a grant to assess the feasibility of renewable resource-related economic development activities in the area. The grant project included a public outreach and training component and was to include a demonstration project; however, the demonstration project was not completed due to lack of identification of an entity willing to locate a project in White Pine County. White Pine County completed the assessment of renewable resources and a feasibility study on the potential for a renewable energy-focused economic sector within the County. The feasibility study concluded "allmore » resources studied were present and in sufficient quantity and quality to warrant consideration for development" and there were varying degrees of potential economic impact based on the resource type and project size. The feasibility study and its components were to be used as tools to attract potential developers and other business ventures to the local market. White Pine County also marketed the County’s resources to the renewable energy business community in an effort to develop contracts for demonstration projects. The County also worked to develop partnerships with local educational institutions, including the White Pine County School District, conducted outreach and training for the local community.« less
7 CFR 4280.179 - Selecting feasibility study grant applications for award.
Code of Federal Regulations, 2013 CFR
2013-01-01
... GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280... certify that the purposes of the project can be met, and the Agency must determine the project is...
7 CFR 4280.179 - Selecting feasibility study grant applications for award.
Code of Federal Regulations, 2012 CFR
2012-01-01
... GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280... certify that the purposes of the project can be met, and the Agency must determine the project is...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
Renewable Energy Feasibility Study Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rooney, Tim
2013-10-30
The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including: Technical appropriateness; Solar resource characteristics and expected system performance; Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARESmore » Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including: Resource analysis and costs; Identification of potential bioenergy projects; Technical and economic (levelized cost of energy) modeling for selected project configuration.« less
Ecological Feasibility Studies in Restoration Decision Making
NASA Astrophysics Data System (ADS)
Hopfensperger, Kristine N.; Engelhardt, Katharina A. M.; Seagle, Steven W.
2007-06-01
The restoration of degraded systems is essential for maintaining the provision of valuable ecosystem services, including the maintenance of aesthetic values. However, restoration projects often fail to reach desired goals for a variety of ecologic, financial, and social reasons. Feasibility studies that evaluate whether a restoration effort should even be attempted can enhance restoration success by highlighting potential pitfalls and gaps in knowledge before the design phase of a restoration. Feasibility studies also can bring stakeholders together before a restoration project is designed to discuss potential disagreements. For these reasons, a feasibility study was conducted to evaluate the efficacy of restoring a tidal freshwater marsh in the Potomac River near Alexandria, Virginia. The study focused on science rather than engineering questions, and thus differed in approach from other feasibility studies that are mostly engineering driven. The authors report the framework they used to conduct a feasibility study to inform other potential restoration projects with similar goals. The seven steps of the framework encompass (1) initiation of a feasibility study, (2) compilation of existing data, (3) collection of current site information, (4) examination of case studies, (5) synthesis of information in a handbook, (6) meeting with selected stakeholders, and (7) evaluation of meeting outcomes. By conducting a feasibility study using the seven-step framework, the authors set the stage for conducting future compliance studies and enhancing the chance of a successful restoration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study... appraisal investigation or feasibility study under this program? Title to any rural water project planned...
Feasibility Study for Battle Mountain Renewable Energy Park
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, Donna
The Feasibility Study for the Battle Mountain Renewable Energy Park project (“Feasibility Study”) will assess the feasibility, benefits and impacts of a 5 Mega Watt (MW) solar photovoltaic (PV) generating system (the “Solar Project” or “Energy Park”) on the Te-Moak Tribe of Western Shoshone Indians of Nevada Battle Mountain Colony in Battle Mountain, Nevada (NV). The Energy Park will provide power for export to utility off-takers and job training and employment for Tribal members and revenue for the Tribe. This Feasibility Study will be a collaborative effort between the Tribal government, consultants, Tribal members and stakeholders and will allow themore » Tribe to make informed decisions regarding the Solar Project.« less
7 CFR 4280.21 - Eligible REDG Ultimate Recipients and Projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... eligible entities to provide medical training and related professional health care skills to rural health... facilitate medical or educational services or job training; or (6) Project feasibility studies and Technical Assistance. A qualified Independent Provider must perform feasibility studies or Technical Assistance. (b...
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
7 CFR 4280.178 - Scoring feasibility study grant applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.178 Scoring... of 100 points possible. (a) Energy replacement or generation. The project can be for either... replacement. 25 points will be awarded if proposed project will offset any portion of the applicant's energy...
Conducting Site and Economic Renewable Energy Project Feasibility Assessments
The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.
Advanced Low Temperature Geothermal Power Cycles (The ENTIV Organic Project) Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mugerwa, Michael
2015-11-18
Feasibility study of advanced low temperature thermal power cycles for the Entiv Organic Project. Study evaluates amonia-water mixed working fluid energy conversion processes developed and licensed under Kalex in comparison with Kalina cycles. Both cycles are developed using low temperature thermal resource from the Lower Klamath Lake Geothermal Area. An economic feasibility evaluation was conducted for a pilot plant which was deemed unfeasible by the Project Sponsor (Entiv).
ERIC Educational Resources Information Center
Wisconsin Univ., Madison.
This document is the second volume of the feasibility study report for the Wisconsin Elementary Teacher Education Project. It provides in part 1 data on program, planning and budgeting, including cost figures for preparing students in the present and new programs, marginal expenses, and costs for implementing the program on other campuses. Part 2…
ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burpo, Rob
2012-02-29
To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viabilitymore » of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.« less
ERIC Educational Resources Information Center
Love, John M.; And Others
This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…
ERIC Educational Resources Information Center
Helbock, Richard W.; Marker, Gordon
This study concerns the feasibility of a Markov chain model for projecting housing values and racial mixes. Such projections could be used in planning the layout of school districts to achieve desired levels of socioeconomic heterogeneity. Based upon the concepts and assumptions underlying a Markov chain model, it is concluded that such a model is…
Technical Analysis Feasibility Study on Smart Microgrid System in Sekolah Tinggi Teknik PLN
NASA Astrophysics Data System (ADS)
Suyanto, Heri
2018-02-01
Nowadays application of new and renewable energy as main resource of power plant has greatly increased. High penetration of renewable energy into the grid will influence the quality and reliability of the electricity system, due to the intermittent characteristic of new and renewable energy resources. Smart grid or microgrid technology has the ability to deal with this intermittent characteristic especially if these renewable energy resources integrated to grid in large scale, so it can improve the reliability and efficiency of the grid. We plan to implement smart microgrid system at Sekolah Tinggi Teknik PLN as a pilot project. Before the pilot project start, the feasibility study must be conducted. In this feasibility study, the renewable energy resources and load characteristic at the site will be measured. Then the technical aspect of this feasibility study will be analyzed. This paper explains that analysis of ths feasibility study.
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2014 CFR
2014-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2013 CFR
2013-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
7 CFR 4280.176 - Feasibility study grant applications-content.
Code of Federal Regulations, 2012 CFR
2012-01-01
... renewable energy system. (10) If the applicant is a rural small business, certification that the feasibility study grant will be for a renewable energy system project that is located in a rural area. (11) The... Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.176...
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2014 CFR
2014-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2013 CFR
2013-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
7 CFR Appendix E to Subpart B of... - Feasibility Study Content
Code of Federal Regulations, 2012 CFR
2012-01-01
... project including any additional markets created (e.g., for agricultural and forestry products and agricultural waste material) and potential for rural economic development. Provide feasibility/plans of project...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for...
Molinos-Senante, M; Hernández-Sancho, F; Sala-Garrido, R
2011-12-01
Water reuse is an emerging and promising non-conventional water resource. Feasibility studies are essential tools in the decision making process for the implementation of water-reuse projects. However, the methods used to assess economic feasibility tend to focus on internal costs, while external impacts are relegated to unsubstantiated statements about the advantages of water reuse. Using the concept of shadow prices for undesirable outputs of water reclamation, the current study developed a theoretical methodology to assess internal and external economic impacts. The proposed methodological approach is applied to 13 wastewater treatment plants in the Valencia region of Spain that reuse effluent for environmental purposes. Internal benefit analyses indicated that only a proportion of projects were economically viable, while when external benefits are incorporated all projects were economically viable. In conclusion, the economic feasibility assessments of water-reuse projects should quantitatively evaluate economic, environmental and resource availability. Copyright © 2011 Elsevier Ltd. All rights reserved.
Water reuse in the Apatlaco River Basin (México): a feasibility study.
Moeller-Chávez, G; Seguí-Amórtegui, L; Alfranca-Burriel, O; Escalante-Estrada, V; Pozo-Román, F; Rivas-Hernández, A
2004-01-01
The aim of this work is to determine the technical and economic feasibility of implementing different reclamation and reuse projects that improve the quality of the Apatlaco river basin located in the central part of Mexico. A special methodology based on a decision support system was developed. This methodology allows to decide if it is convenient or not to finance a reclamation or reuse project for the most common water uses in the basin. This methodology is based on the net present value criteria (NPV) of the effective cash flow during the useful life of the project. The results obtained reveal a technical and economical feasibility for industrial reuse in Jiutepec and for agricultural reuse in Zacatepec and Emiliano Zapata. On the other hand, sanitation projects are not feasible in all cases analyzed. Therefore, Mexican Regulation (Ley Federal de Derechos en Materia de Agua) as currently implemented, does not promote and support this kind of projects.
1989-12-01
project nor affect significantly the projects econmic efficiency. These effects are described in the Feasibility Report, EIS/EIR and suportin...modifications beca necesary. To insure the econmic efficiency of the project using the accelerated rise rate in NRc Case III, the Regional Project was...is a str econmic candidate. 23 Table 14 RICtOALL P3ECr ECONaMEC FEABILIY WI H SEA LEVEL RISE (1988 Price Level) Oticon 3 Historical NRC Project
Conceptual Thermal Treatment Technologies Feasibility Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suer, A.
1996-02-28
This report presents a conceptual Thermal Treatment Technologies Feasibility Study (FS) for the Savannah River Site (SRS) focusing exclusively on thermal treatment technologies for contaminated soil, sediment, or sludge remediation projects.
Feasibility study of new energy projects on three-level indicator system
NASA Astrophysics Data System (ADS)
Zhan, Zhigang
2018-06-01
With the rapid development of new energy industry, many new energy development projects are being carried out all over the world. To analyze the feasibility of the project. we build feasibility of new energy projects assessment model, based on the gathered abundant data about progress in new energy projects.12 indicators are selected by principal component analysis(PCA). Then we construct a new three-level indicator system, where the first level has 1 indicator, the second level has 5 indicators and the third level has 12 indicators to evaluate. Moreover, we use the entropy weight method (EWM) to get weight vector of the indicators in the third level and the multivariate statistical analysis(MVA)to get the weight vector of indicators in the second-class. We use this evaluation model to evaluate the feasibility of the new energy project and make a reference for the subsequent new energy investment. This could be a contribution to the world's low-carbon and green development by investing in sustainable new energy projects. We will introduce new variables and improve the weight model in the future. We also conduct a sensitivity analysis of the model and illustrate the strengths and weaknesses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49... project be authorized for construction? In reviewing a feasibility study, Reclamation will assure that the... alternative is clearly supported by the feasibility study, based on application of the following factors...
7 CFR 1735.33 - Variable interest rate loans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... downward to a rate not less than the rate determined in the feasibility study on which the loan was based..., projections set forth in the loan feasibility study will be revised annually by RUS (beginning within four... adjusted. The interest rate used in determining feasibility is the rate charged to the borrower until the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The results of marketing, economic, and financial studies are reported in this volume.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less
ERIC Educational Resources Information Center
WHEELER, C. HERBERT, JR.
THIS STUDY WAS CONDUCTED TO DETERMINE THE FEASIBILITY OF USING TRAVELING OR MOBILE UNITS TO IMPROVE THE QUALITY OF EDUCATION IN THE APPALACHIA REGION. IT EXAMINED THE LITERATURE WRITTEN IN THE LAST TEN YEARS ON EDUCATIONAL PROJECTS USING SOME FORM OF MOBILE FACILITY. FROM THIS LITERATURE A LIST OF PLANNED MOBILE PROJECTS WAS COMPILED AND…
ERIC Educational Resources Information Center
Christensen, Julie J.; Humiston, Sharon G.; Long, Christine E.; Kennedy, Allison M.; DiMattia, Kimberly; Kolasa, Maureen S.
2012-01-01
This study qualitatively assesses the acceptability and feasibility of a school-located vaccination for influenza (SLIV) project that was conducted in New York State in 2009-2011, from the perspectives of project participants with different roles. Fourteen in-depth semistructured interviews with participating schools' personnel and the mass…
7 CFR 4279.261 - Application for loan guarantee content.
Code of Federal Regulations, 2012 CFR
2012-01-01
... project; (2) The viability of such technology for the particular project application; (3) The development... location, size, etc.). Economic feasibility determination. Market feasibility determination. Technical.... Recommendations for implementation. (B) Economic Feasibility: Information regarding project site; Availability of...
Feasibility Studies for a Mediterranean Neutrino Observatory - The NEMO.RD Project
NASA Astrophysics Data System (ADS)
de Marzo, C.; Ambriola, M.; Bellotti, R.; Cafagna, F.; Calicchio, M.; Ciacio, F.; Circella, M.; de Marzo, C.; Montaruli, T.; Falchieri, D.; Gabrielli, A.; Gandolfi, E.; Masetti, M.; Vitullo, C.; Zanarini, G.; Habel, R.; Usai, I.; Aiello, S.; Burrafato, G.; Caponetto, L.; Costanzo, E.; Lopresti, D.; Pappalardo, L.; Petta, C.; Randazzo, N.; Russo, G. V.; Troia, O.; Barnà, R.; D'Amico, V.; de Domenico, E.; de Pasquale, D.; Giacobbe, S.; Italiano, A.; Migliardo, F.; Salvato, G.; Trafirò, A.; Trimarchi, M.; Ameli, F.; Bonori, M.; Bottai, S.; Capone, A.; Desiati, P.; Massa, F.; Masullo, R.; Salusti, E.; Vicini, M.; Coniglione, R.; Migneco, E.; Piattelli, P.; Riccobene, R.; Sapienza, P.; Cordelli, M.; Trasatti, L.; Valente, V.; de Marchis, G.; Piccari, L.; Accerboni, E.; Mosetti, R.; Astraldi, M.; Gasparini, G. P.; Ulzega, A.; Orrù, P.
2000-06-01
The NEMO.RD Project is a feasibility study of a km3 underwater telescope for high energy astrophysical neutrinos to be located in the Mediterranea Sea. At present this study concerns: i) Monte Carlo simulation study of the capabilities of various arrays of phototubes in order to determine the detector geometry that can optimize performance and cost; ii) design of low power consumption electronic cards for data acquisition and transmission to shore; iii) feasibility study of mechanics, deployment, connection and maintenance of such a detector in collaboration with petrol industries having experience of undersea operations; iv) oceanographic exploration of various sites in search for the optimal one. A brief report on the status of points i) and iv) is presented here
Transit Feasibility Study Guilford Courthouse National Military Park.
DOT National Transportation Integrated Search
2009-02-28
This study is intended to be a broad overview of the transit feasibility at Guilford Courthouse NMP. The study will discuss the project background and context, and outline the two options for transit service. A detailed evaluation of costs and benefi...
Missouri toll feasibility study : phase I
DOT National Transportation Integrated Search
2002-05-01
The purpose of this toll feasibility study is to estimate the potential revenue that could be generated from several candidate toll projects within the state. Potential toll revenue may then be considered in combination with other possible funding me...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Federal Government's share of project cost. 505.13... Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... eligible costs. (b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A...
ERIC Educational Resources Information Center
James, Arthur; Arboleda, Jairo
1979-01-01
Plans for a nationwide system of education at a distance in Colombia, South America, are now under way to meet growing demands for higher education and to decentralize the current university system. Prior to this decision, a feasibility project was undertaken by the University of Antioquia. The project and results are reported. (Author/JMD)
The km 3 Mediterranean neutrino observatory - the NEMO.RD project
NASA Astrophysics Data System (ADS)
De Marzo, C. N.
2001-05-01
The NEMO.RD Project is a feasibility study of a km 3 underwater telescope for high energy astrophysical neutrinos to be located in the Mediterranean Sea. Results on various issues of this project are presented on: i) Monte Carlo simulation study of the capabilities of various arrays of phototubes in order to determine the detector geometry that can optimize performance and cost; ii) oceanographic survey of various sites in search of the optimal one; iii) feasibility study of mechanics, deployment, connections and maintenance of such a detector. Parameters of a site near Capo Passero, Sicily, where depth, transparency and other water parameters seem optimal are shown.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1983-12-30
The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.
23 CFR 505.13 - Federal Government's share of project cost.
Code of Federal Regulations, 2010 CFR
2010-04-01
... INFRASTRUCTURE MANAGEMENT PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING § 505.13 Federal Government's share of project cost. (a) Based on engineering studies, studies of economic feasibility, and... 23 Highways 1 2010-04-01 2010-04-01 false Federal Government's share of project cost. 505.13...
7 CFR 1744.55 - Application procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... under applicable state law to undertake the project; (3) Engineering and pertinent studies related to the projects or purposes to be financed, when applicable; (4) Feasibility studies with pro forma...
7 CFR 1744.55 - Application procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... under applicable state law to undertake the project; (3) Engineering and pertinent studies related to the projects or purposes to be financed, when applicable; (4) Feasibility studies with pro forma...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less
Hualapai Wind Project Feasibility Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davidson, Kevin; Randall, Mark; Isham, Tom
The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less
FEASIBILITY STUDY ON EXECUTIVE PROGRAM DEVELOPMENT FOR BASIN ECOSYSTEMS MODELING
The project was undertaken in order to provide a feasibility study in developing and implementing a complete executive program to interface automatically various basin-wide water quality models for use by relatively inexperienced modelers. This executive program should ultimately...
Development of Hydrogen Education Programs for Government Officials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Shannon; Keller, Russ
1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site
Vessel electrification feasibility study for the New York state canals.
DOT National Transportation Integrated Search
2013-10-01
The objective of this study was to determine the technical and economic feasibility of repowering a diesel-fueled : New York State Canal Corporation (NYSCC) work boat with a diesel hybrid-electric or full-electric powertrain. : The project team instr...
78 FR 60271 - Project No. 13599-001
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13599-001] Green Power... (FPA), proposing to study the feasibility of the Lake 3160 Hydroelectric Project (project) to be.... The project would occupy about 475 acres of lands within the Tongass National Forest managed by the U...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
...), proposing to study the feasibility of the Verde Pumped Storage Project (project) to be located within the... Company or Salt River Project. The estimated annual generation of the Verde Pumped Storage Project would...
The Feasibility of Implementing Multicommand Software Functions on a Microcomputer Network.
1979-10-01
studies 20 ABSTRACT fConllnuo on revete &Ide it necessary and Identify by block number) ’This report presents the results of a study of design...considerations for hybrid monitor systems for distributed microcomputer networks. The objective of the study was to determine the feasibility of such monitor...Management Informa- tion and Computer Sciences. The study was one task on a project bentitled "The Feasibility of Implementing Multicommand Software
78 FR 46677 - Environmental Impact Statement; Calcasieu Parish, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... between the I-210 interchanges including the Calcasieu River Bridge. A feasibility and environmental study... project. The feasibility study involved four phases: (1) Information and Data Gathering; (2) Preliminary Study; (3) Refined Alternatives; and (4) Preparation and Submission of a Final Report. Based on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
..., proposing to study the feasibility of Project Green Dream (Project No. 13625), to be located at the New... Dam are owned and operated by the U.S. Army Corps of Engineers. Project Green Dream would include new...
[Telescience : Feasibility studies, definition and a fair answer to the scientific brain drain].
Craemer, E M; Bassa, B; Jacobi, C; Becher, H; Meyding-Lamadé, U
2017-02-01
What is telescience? Is it feasible to transfer academic information with the help of telematics to educate and teach young scientists over large distances? The term telescience has so far not been defined but covers a variety of possibilities, which could be successfully implemented worldwide. This article gives examples and highlights the feasibility analysis of telescience. We have carried out feasibility analyses for neurological functional diagnostics, an epidemiological cross-sectional study as well as a laboratory study for detection of thrombocyte function during dengue fever with the help of telemedicine. The basis for all these projects was a telemedical transcontinental cooperation over a distance of 12,000 km. All performed studies demonstrated the feasibility. With the help of telematics the laboratory techniques, planning, conduction and interpretation of results as well as publication skills can be transferred. Telescience is feasible. Our studies showed that telescience is a very promising option to transfer knowledge, which will help to enable professional expertise to be transferred directly to the region/country without a brain drain. All too often young motivated scientists are enticed to move to well-known institutions, which involves the danger of a brain drain. Brain drain can be avoided in favor of local implementation of scientific projects. Our results illustrate that it is feasible to educate and guide scientists with the help of telematics infrastructures.
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAM Feasibility Studies § 404.50 What information will be included in the feasibility report prepared... determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project should be authorized for construction, and the reasons supporting the recommendation. This recommendation...
Feasibility Study: New Knowledge Demands in Turbulent Business World
NASA Astrophysics Data System (ADS)
Sprice, Renate; Kirikova, Marite
Feasibility study is one of the early activities in information systems (IS) development when important decisions regarding choice among several possible systems development alternatives are to be made. In times of relatively stable business environment and waterfall model as a systems development approach, the role and methods of feasibility study where quite clear (Kendall and Kendall 1995). However, new software development methods and the necessity to develop more rapidly new IS or their parts may. challenge the possibility to evaluate project feasibility in the early stages of IS development.
Feasibility Study & Design of Brightfield Solar Farm
DOE Office of Scientific and Technical Information (OSTI.GOV)
Law, Susan
2014-09-28
This Congressionally Directed Project originally provided funds to the Township of Lower Providence, Pennsylvania for the purpose of investigating the potential for a renewable energy generation facility to make beneficial reuse of a closed landfill located within the Township, known as Moyer Landfill. Early in the course of the project, it was determined through collaboration and discussion with DOE to alter the scope of the project to include a feasibility assessment of a landfill solar project, as well as to construct a demonstration solar project at the municipal facilities to provide an educational and community outreach opportunity for the Townshipmore » to offer regarding solar photovoltaic (“PV”) electricity generation.« less
Eastern Rensselaer County Community Warehouse. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
The Eastern Rensselaer County Community Warehouse (ERCCW) project was conducted to determine if reuse is a feasible waste-management technology. The project had three phases: determining the feasibility of economically collecting, warehousing, refurbishing, and selling salvageable items from transfer stations, individuals, and businesses located in a rural area; preparing an operational plan; implementing the plan. Project findings suggest that, with proper management, a warehouse for waste reuse is feasible and can be self-sustaining. It also found that reuse results in the short-term saving of landfill capacity, and can provide low-cost goods to residents of rural areas. The study concludes that reuse,more » through retailing, is a viable waste-management practice. The report has been prepared as a how-to guide for municipalities, organizations, and individuals interested in reducing landfill waste and in establishing a reuse/recycling facility. Questions to consider, resources, and an overview of the ERCCW project are provided.« less
Cedar-Iowa River Rail transit project feasibility study.
DOT National Transportation Integrated Search
2006-11-09
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of : Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail : service(s) that would operate over existing trackage of the Cedar Rapids...
DOT National Transportation Integrated Search
2006-08-01
The overall purpose of this research project is to conduct a feasibility study and development of a general methodology to determine the impacts on multi-modal and system efficiency of alternative freight security measures. The methodology to be exam...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... growth projections in the study area, it was determined that the travel demand in the Loop 9 project area would not warrant the project as originally proposed. TxDOT intends to conduct a feasibility study to...
Feasibility test of CADD Webmenus.
DOT National Transportation Integrated Search
2009-08-01
The Arizona Department of Transportation (ADOT) initiated SPR Project 683: CADD Webmenus Feasibility Study to conduct a proof-of-concept test of Web-based CADD menus for ADOT agency-wide CADD applications. ADOT is currently interested in the feasibil...
Canton hydroelectric project: feasibility study. Final report, appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-05-01
These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
BUILDING MATERIALS RECLAMATION PROGRAM
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Weggel; Shen-En Chen; Helene Hilger
2010-08-31
This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less
2012-08-02
REPORT Feasibility study for the use of green, bio-based, efficient reactive sorbent material to neutralize chemical warfare agents 14. ABSTRACT 16...way cellulose, lignin and hemicelluloses interact as well as whole wood dissolution occurs in ILs. The present project was conducted to 1. REPORT...Feasibility study for the use of green, bio-based, efficient reactive sorbent material to neutralize chemical warfare agents Report Title ABSTRACT Over the
NASA Astrophysics Data System (ADS)
Ross, K. W.; Childs-Gleason, L. M.; Cripps, G. S.; Clayton, A.; Remillard, C.; Watkins, L. E.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.
2017-12-01
The NASA DEVELOP National Program carries out many projects every year with the goal of bringing the benefits of NASA Earth science to bear on decision-making challenges that are local in scale. Every DEVELOP project partners end users with early/transitioning science professionals. Many of these projects invited communities to consider NASA science data in new ways to help them make informed decisions. All of these projects shared three characteristics: they were rapid, nimble and risk-taking. These projects work well for some communities, but might best be suited as a feasibility studies that build community/institutional capacity towards eventual solutions. This presentation will discuss DEVELOP's lessons learned and best practices in conducting short-term feasibility projects with communities, as well as highlight several past successes.
DOT National Transportation Integrated Search
2010-08-01
Radio frequency identification device (RFID) technology provides the capability to store a unique identification : number and some basic attribute information, which can be retrieved wirelessly. This research project studied : the feasibility of usin...
A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terry Battiest
2012-11-30
The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through themore » decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.« less
NASA Astrophysics Data System (ADS)
1981-07-01
The findings of a feasibility study performed for Basin View Heating District in Klamath Falls, Oregon are reported. The physical, economic, and political feasibility of establishing a geothermal heating district to provide space heat to housing units in the Basin View Development of Klamath Falls are determined. Of the several systems considered, all are physically feasible. The project is politically feasible if the owner complies with governmental requirements. Economic feasibility is based on considerations of money value rates, tax rates and expected rates of return, which are dependent on government and money markets. For analysis a money value rate of 21% and an owner's marginal tax rate of 35% were adopted.
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13801-000] Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in...
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (including costs of an initial feasibility study), consulting fees, costs of preliminary financial... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... to study the feasibility of the proposed San Onofre OWEG Electricity Farm Project (project). The proposed project would utilize 11,443 Ocean Wave Electricity Generation (OWEG) units, an experimental... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13679-000] JD Products, LLC...
Fostering sustainable feedstock production for advanced biofuels on underutilised land in Europe
NASA Astrophysics Data System (ADS)
Mergner, Rita; Janssen, Rainer; Rutz, Dominik; Knoche, Dirk; Köhler, Raul; Colangeli, Marco; Gyuris, Peter
2017-04-01
Background In context of growing competition between land uses, bioenergy development is often seen as one of possible contributors to such competition. However, the potential of underutilized land (contaminated, abandoned, marginal, fallow land etc.) which is not used or cannot be used for productive activities is not exhausted and offers an attractive alternative for sustainable production of different biomass feedstocks in Europe. Depending on biomass feedstocks, different remediation activities can be carried out in addition. Bioenergy crops have the potential to be grown profitably on underutilized land and can therefore offer an attractive source of income on the local level contributing to achieving the targets of the Renewable Energy Directive (EC/2009). The FORBIO project The FORBIO project demonstrates the viability of using underutilised land in EU Member States for sustainable bioenergy feedstock production that does not affect the supply of food, feed and land currently used for recreational or conservation purposes. Project activities will serve to build up and strengthen local bioenergy value chains that are competitive and that meet the highest sustainability standards, thus contributing to the market uptake of sustainable bioenergy in the EU. Presented results The FORBIO project will develop a methodology to assess the sustainable bioenergy production potential on available underutilized lands in Europe at local, site-specific level. Based on this methodology, the project will produce multiple feasibility studies in three selected case study locations: Germany (lignite mining and sewage irrigation fields in the metropolis region of Berlin and Brandenburg), Italy (contaminated land from industrial activities in Sulcis, Portoscuso) and Ukraine (underutilised marginal agricultural land in the North of Kiev). The focus of the presentation will be on the agronomic and techno-economic feasibility studies in Germany, Italy and Ukraine. Agronomic feasibility studies consider agronomic performances in different climatic zones, soil conditions, land morphology, availability of irrigation infrastructures and limitations due to anthropic soil contamination. The outcomes of the techno-economic feasibility studies for the biomasses selected as potentially feasible for underutilized lands in the selected case study locations will be presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, J. O.; Mosey, G.
2014-04-01
Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing contaminated lands in the Buffalo, New York, area for utility-scale wind development is explored. The study found that there is available land, electrical infrastructure, wind resource, and local interest to support a commercial wind project; however, economies of scale and local electrical markets may need further investigation before significant investment is made into developing a wind project at the Buffalo Reuse Authority site.
7 CFR 1980.442 - Feasibility studies.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management, nature and extent of market area, marketing plans for sale of projected output, extent of... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.442 Feasibility...
NASA Technical Reports Server (NTRS)
Barnes, G. D.
1982-01-01
The feasibility of a polygeneration plant at Kennedy Space Center was studied. Liquid hydrogen and gaseous nitrogen are the two principal products in consideration. Environmental parameters (air quality, water quality, biological diversity and hazardous waste disposal) necessary for the feasibility study were investigated. A National Environmental Policy Act (NEPA) project flow sheet was to be formulated for the environmental impact statement. Water quality criteria for Florida waters were to be established.
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
7 CFR 1942.116 - Economic feasibility requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Economic feasibility requirements. 1942.116 Section 1942.116 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE... Facilities Projects § 1942.116 Economic feasibility requirements. All projects financed under this section...
2005-06-01
Logistics, BA-5590, BB- 390, BB-2590, PVPC, Iraq, Power Grid, Infrastructure, Cost Estimate, Photovoltaic Power Conversion (PVPC), MPPT 16. PRICE...the cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi electrical infrastructure. This project...cost and feasibility of using photovoltaic (PV) solar power to assist in the rebuilding of the Iraqi infrastructure. The project examines available
Artemis: Results of the engineering feasibility study
NASA Technical Reports Server (NTRS)
1991-01-01
Information is given in viewgraph form for the Engineering Feasibility Study of the Artemis Project, a plan to establish a permanent base on the Moon. Topics covered include the Common Lunar Lander (CLL), lunar lander engineering study results, lunar lander trajectory analysis, lunar lander conceptual design and mass properties, the lunar lander communication subsystem design, and product assurance.
Smith, Nathan Grant; Hart, Trevor A; Kidwai, Ammaar; Vernon, Julia R G; Blais, Martin; Adam, Barry
2017-09-01
Project PRIDE (Promoting Resilience In Discriminatory Environments) is an 8-session small group intervention aimed at reducing negative mental and behavioral health outcomes resulting from minority stress. This study reports the results of a one-armed pilot test of Project PRIDE, which aimed to examine the feasibility and potential for efficacy of the intervention in a sample of 33 gay and bisexual men aged 18 to 25. The intervention appeared feasible to administer in two different sites and all participants who completed posttreatment (n = 22) or follow-up (n = 19) assessments reported high satisfaction with the intervention. Small to large effect sizes were observed for increases in self-esteem; small effect sizes were found for decreases in loneliness and decreases in minority stress variables; and small and medium effect sizes were found for reductions in alcohol use and number of sex partners, respectively. Overall, Project PRIDE appears to be a feasible intervention with promise of efficacy. Copyright © 2017. Published by Elsevier Ltd.
Duke Engineering explores huge African Power Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, P.
1994-10-14
Duke Engineering & Services and the African Republic of Uganda have entered into a memorandum of understanding to explore the feasibility of installing one or more hydropower plants along the Nile River and building a 2,000 mile transmission line through southern Africa. The project`s participants say they envision a southern African electricity grid connecting all countries in the region. A team comprised of officials from DE&S, Edlow and SAD-ELEC will conduct a six-month, two-part study on the feasibility of linking the existing grid system in the region. The first part of the study will look at the feasibility of installingmore » one or more independent hydropower plants along the Nile and other rivers in Uganda. The second part will explore the design, construction and operation of a transmission system to interconnect Uganda, through neighboring countries to the south and east, to the Republic of South Africa. The site for the proposed hydroelectric plant will determine the route of the transmission line.« less
Renewable Energy Feasibility Study Leading to Development of the Native Spirit Solar Energy Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carolyn Stewart; Tracey LeBeau
2008-01-31
DOE-funded renewable energy feasibility study conducted by Red Mountain Tribal Energy on behalf of the Southwest Tribal Energy Consortium (SWTEC). During the course of the study, SWTEC members considered multiple options for the organization structure, selected a proposed organization structure, and drafted a Memorandum of Understanding for the SWTEC organization. High-level resource assessments for SWTEC members were completed; surveys were developed and completed to determine each member’s interest in multiple participation options, including on-reservation projects. With the survey inputs in mind, multiple energy project options were identified and evaluated on a high-level basis. That process led to a narrowing ofmore » the field of technology options to solar generation, specifically, utility-scale Concentrating Solar-Powered Generation projects, with a specific, tentative project location identified at the Fort Mojave Indian Reservation -- the Native Spirit Solar Energy Facility.« less
Moya, Diego; Paredes, Juan; Kaparaju, Prasad
2018-01-01
RETScreen presents a proven focused methodology on pre-feasibility studies. Although this tool has been used to carry out a number of pre-feasibility studies of solar, wind, and hydropower projects; that is not the case for geothermal developments. This method paper proposes a systematic methodology to cover all the necessary inputs of the RETScreen-International Geothermal Project Model. As case study, geothermal power plant developments in the Ecuadorian context were analysed by RETScreen-International Geothermal Project Model. Three different scenarios were considered for analyses. Scenario I and II considered incentives of 132.1 USD/MWh for electricity generation and grants of 3 million USD. Scenario III considered the geothermal project with an electricity export price of 49.3 USD/MWh. Scenario III was further divided into IIIA and IIIB case studies. Scenario IIIA considered a 3 million USD grant while Scenario IIIB considered an income of 8.9 USD/MWh for selling heat in direct applications. Modelling results showed that binary power cycle was the most suitable geothermal technology to produce electricity along with aquaculture and greenhouse heating for direct use applications in all scenarios. Financial analyses showed that the debt payment would be 5.36 million USD/year under in Scenario I and III. The correspindig values for Scenario II was 7.06 million USD/year. Net Present Value was positive for all studied scenarios except for Scenario IIIA. Overall, Scenario II was identified as the most feasible project due to positive NPV with short payback period. Scenario IIIB could become financially attractive by selling heat for direct applications. The total initial investment for a 22 MW geothermal power plant was 114.3 million USD (at 2017 costs). Economic analysis showed an annual savings of 24.3 million USD by avoiding fossil fuel electricity generation. More than 184,000 tCO 2 eq. could be avoided annually.
Integrated Mid-Continent Carbon Capture, Sequestration & Enhanced Oil Recovery Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brian McPherson
2010-08-31
A consortium of research partners led by the Southwest Regional Partnership on Carbon Sequestration and industry partners, including CAP CO2 LLC, Blue Source LLC, Coffeyville Resources, Nitrogen Fertilizers LLC, Ash Grove Cement Company, Kansas Ethanol LLC, Headwaters Clean Carbon Services, Black & Veatch, and Schlumberger Carbon Services, conducted a feasibility study of a large-scale CCS commercialization project that included large-scale CO{sub 2} sources. The overall objective of this project, entitled the 'Integrated Mid-Continent Carbon Capture, Sequestration and Enhanced Oil Recovery Project' was to design an integrated system of US mid-continent industrial CO{sub 2} sources with CO{sub 2} capture, and geologicmore » sequestration in deep saline formations and in oil field reservoirs with concomitant EOR. Findings of this project suggest that deep saline sequestration in the mid-continent region is not feasible without major financial incentives, such as tax credits or otherwise, that do not exist at this time. However, results of the analysis suggest that enhanced oil recovery with carbon sequestration is indeed feasible and practical for specific types of geologic settings in the Midwestern U.S.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-12
... Disadvantaged Communities, SIP11-041, Feasibility Study to Link Data from the National Breast and Cervical..., Management Analysis and Services Office, CDC, pursuant to Public Law 92-463. Matters To Be Discussed: The... Promote Colorectal Cancer Screening in Disadvantaged Communities, SIP11-041, Feasibility Study to Link...
DOT National Transportation Integrated Search
2014-04-01
This project explored the feasibility of using Unmanned Aerial Systems (UASs) in Georgia : Department of Transportation (GDOT) operations. The research team conducted 24 interviews with : personnel in four GDOT divisions. Interviews focused on (1) th...
Final contract report : real-time EMS helicopter video feasibility study
DOT National Transportation Integrated Search
2001-11-01
The purpose of this project was to determine whether the use of ground-based video imaging by local rescue squad personnel and Pegasus medical staff is technically and organizationally feasible as a tool to improve pre-hospital care provided to crash...
Final Report - Wind and Hydro Energy Feasibility Study - June 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jim Zoellick; Richard Engel; Rubin Garcia
2011-06-17
This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.
NASA Astrophysics Data System (ADS)
Remillard, C. M.; Madden, M.; Favors, J.; Childs-Gleason, L.; Ross, K. W.; Rogers, L.; Ruiz, M. L.
2016-06-01
The NASA DEVELOP National Program bridges the gap between NASA Earth Science and society by building capacity in both participants and partner organizations that collaborate to conduct projects. These rapid feasibility projects highlight the capabilities of satellite and aerial Earth observations. Immersion of decision and policy makers in these feasibility projects increases awareness of the capabilities of Earth observations and contributes to the tools and resources available to support enhanced decision making. This paper will present the DEVELOP model, best practices, and two case studies, the Colombia Ecological Forecasting project and the Miami-Dade County Ecological Forecasting project, that showcase the successful adoption of tools and methods for decision making. Through over 90 projects each year, DEVELOP is always striving for the innovative, practical, and beneficial use of NASA Earth science data.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14065-000] Amnor Hydro West... Act (FPA), proposing to study the feasibility of the Clear Creek Dam Hydropower Project (project) to...' express permission. The proposed project would utilize the existing outlet works of the U.S. Bureau of...
Role of Hydrogeology in Professional Environmental Projects
The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
Butnariu, Dan; Censor, Yair; Gurfil, Pini; Hadar, Ethan
2010-01-01
We study some methods of subgradient projections for solving a convex feasibility problem with general (not necessarily hyperplanes or half-spaces) convex sets in the inconsistent case and propose a strategy that controls the relaxation parameters in a specific self-adapting manner. This strategy leaves enough user-flexibility but gives a mathematical guarantee for the algorithm’s behavior in the inconsistent case. We present numerical results of computational experiments that illustrate the computational advantage of the new method. PMID:20182556
Butnariu, Dan; Censor, Yair; Gurfil, Pini; Hadar, Ethan
2008-07-03
We study some methods of subgradient projections for solving a convex feasibility problem with general (not necessarily hyperplanes or half-spaces) convex sets in the inconsistent case and propose a strategy that controls the relaxation parameters in a specific self-adapting manner. This strategy leaves enough user-flexibility but gives a mathematical guarantee for the algorithm's behavior in the inconsistent case. We present numerical results of computational experiments that illustrate the computational advantage of the new method.
The scientific programme between ESRO and ESA: Choosing new projects (1973-1977)
NASA Astrophysics Data System (ADS)
Russo, Arturo
1995-02-01
The ESA History Study Reports are preliminary reports of studies carried out within the framework of an ESA (European Space Agency) contract. They will form the basis of a comprehensive study of European Space activities covering the period 1959-1987. The transformation of ESRO (European Space Research Organization) into ESA found the Organization's bodies involved in a new round of the decision-making process to select future scientific satellite projects. In this report, the three main phases of the decision-making process are discussed. The first, from June 1973 to April 1974, the European scientific community and their representatives in ESA's advisory committee structure were invited to agree on a set of space missions for which a definition study was recommended. At the end of this phase, thirteen missions were selected for such a definition study by ESRO's Scientific Program Board (SPB). The second phase covers the period from that decision up to March 1975, when a much more important decision was required, namely to select a restricted number of missions for which a feasibility study was to be performed. The aims of such feasibility studies were to establish the technical and financial feasibility of each project, to propose a well-defined project concept, to identify the research and technology effort required to support it, and to state a preliminary cost estimate to completion. The third phase covers the first two years of the new Agency's life, and concludes with the selection of the projects to be adopted in ESA's scientific program.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
...), proposing to study the feasibility of the DaGuerre Point Dam Hydropower Project (DaGuerre Point Dam Project or project) to be located at the U.S. Army Corps of Engineers' (USACE) DaGuerre Point Dam, on the...
Feasibility Analysis For Heating Tribal Buildings with Biomass
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steve Clairmont; Micky Bourdon; Tom Roche
2009-03-03
This report provides a feasibility study for the heating of Tribal buildings using woody biomass. The study was conducted for the Confederated Salish and Kootenai Tribes of the Flathead Reservation in western Montana. S&K Holding Company and TP Roche Company completed the study and worked together to provide the final report. This project was funded by the DOE's Tribal Energy Program.
ERIC Educational Resources Information Center
Carpenter, Erika M.; Frankel, Fred; Marina, Michael; Duan, Naihua; Smalley, Susan L.
2004-01-01
The present study examines the feasibility of Internet delivery of a Parent-Adolescent Conflict Training (PACT) program to families with an ADHD teen. The goals of the project are to ascertain the willingness of families to participate in this web-based study, identify relevant issues related to confidentiality of Internet data collection, and…
Feasibility study guidelines for public private partnership projects : Vol. 1 & 2
DOT National Transportation Integrated Search
2010-10-01
For many state Departments of Transportation (DOTs), a shortage of transportation funds requires the : agencies to combat that shortage by implementing innovative programs. Nationwide, Public Private : Partnerships (PPP) in transportation projects ar...
Frederick County road orders 1743-1772.
DOT National Transportation Integrated Search
2005-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Fincastle County road orders 1773-1776.
DOT National Transportation Integrated Search
2007-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Feasibility study guideline for public private partnership projects : volume I & II.
DOT National Transportation Integrated Search
2010-10-01
For many state Departments of Transportation (DOTs), a shortage of transportation funds requires the : agencies to combat that shortage by implementing innovative programs. Nationwide, Public Private : Partnerships (PPP) in transportation projects ar...
Montgomery County road orders 1777-1806.
DOT National Transportation Integrated Search
2008-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Amelia County road orders, 1735-1753.
DOT National Transportation Integrated Search
2002-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Botetourt County road orders 1770-1778.
DOT National Transportation Integrated Search
2007-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Fairfax County road orders, 1749-1800.
DOT National Transportation Integrated Search
2003-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
Feasibility study for mega-electron-volt electron beam tomography.
Hampel, U; Bärtling, Y; Hoppe, D; Kuksanov, N; Fadeev, S; Salimov, R
2012-09-01
Electron beam tomography is a promising imaging modality for the study of fast technical processes. But for many technical objects of interest x rays of several hundreds of keV energy are required to achieve sufficient material penetration. In this article we report on a feasibility study for fast electron beam computed tomography with a 1 MeV electron beam. The experimental setup comprises an electrostatic accelerator with beam optics, transmission target, and a single x-ray detector. We employed an inverse fan-beam tomography approach with radiographic projections being generated from the linearly moving x-ray source. Angular projections were obtained by rotating the object.
Cape Blanco wind farm feasibility study
NASA Astrophysics Data System (ADS)
1987-11-01
The Cape Blanco Wind Farm (CBWF) Feasibility Study was undertaken as a prototype for determining the feasibility of proposals for wind energy projects at Northwest sites. It was intended to test for conditions under which wind generation of electricity could be commercially feasible, not by another abstract survey of alternative technologies, but rather through a site-specific, machine-specific analysis of one proposal. Some of the study findings would be most pertinent to the Cape Blanco site - local problems require local solutions. Other findings would be readily applicable to other sites and other machines, and study methodologies would be designed to be modified for appraisal of other proposals. This volume discusses environmental, economic, and technical issues of the Wind Farm.
Bond Feasibility Study. Project Identification Committee Report.
ERIC Educational Resources Information Center
Wichita Public Schools, KS.
A committee, appointed by the Board of Education, was requested to make a comprehensive study of the school building needs of Unified School District No. 259. In an attempt to determine the feasibility of a general bond election to upgrade the public schools, the specific charge to the committee was to evaluate the needs for physical plant…
ERIC Educational Resources Information Center
Jones, Emily M.; Taliaferro, Andrea R.; Elliott, Eloise M.; Bulger, Sean M.; Kristjansson, Alfgeir L.; Neal, William; Allar, Ishonté
2014-01-01
Increasing rates of childhood obesity has prompted calls for comprehensive approaches to school-based physical activity (PA). The purpose of this study was to evaluate the feasibility of comprehensive school physical activity program (CSPAP) development and related contextual issues within a rural Appalachian county using a Systems Approach. A…
An algorithm for the split-feasibility problems with application to the split-equality problem.
Chuang, Chih-Sheng; Chen, Chi-Ming
2017-01-01
In this paper, we study the split-feasibility problem in Hilbert spaces by using the projected reflected gradient algorithm. As applications, we study the convex linear inverse problem and the split-equality problem in Hilbert spaces, and we give new algorithms for these problems. Finally, numerical results are given for our main results.
45 CFR 1336.33 - Eligible applicants and proposed activities which are ineligible.
Code of Federal Regulations, 2014 CFR
2014-10-01
... served. (1) Social and Economic Development Strategies (SEDS) and Preservation and Enhancement of Native... 42 U.S.C. 2991b-3) (2) Alaska-Specific Social and Economic Development Strategies (SEDS) Projects: (i... carry out project objectives, is acceptable; (2) Projects that request funds for feasibility studies...
45 CFR 1336.33 - Eligible applicants and proposed activities which are ineligible.
Code of Federal Regulations, 2011 CFR
2011-10-01
... served. (1) Social and Economic Development Strategies (SEDS) and Preservation and Enhancement of Native... 42 U.S.C. 2991b-3) (2) Alaska-Specific Social and Economic Development Strategies (SEDS) Projects: (i... carry out project objectives, is acceptable; (2) Projects that request funds for feasibility studies...
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
Agua Caliente Solar Feasibility and Pre-Development Study Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carolyn T. Stewart, Managing Partner; Red Mountain Energy Partners
2011-04-26
Evaluation of facility- and commercial-scale solar energy projects on the Agua Caliente Band of Cahuilla Indians Reservation in Palm Springs, CA. The Agua Caliente Band of Cahuilla Indians (ACBCI) conducted a feasibility and pre-development study of potential solar projects on its lands in southern California. As described below, this study as a logical and necessary next step for ACBCI. Support for solar project development in California, provided through the statewide California Solar Initiative (CSI), its Renewable Portfolio Standard and Feed-in Tariff Program, and recently announced Reverse Auction Mechanism, provide unprecedented support and incentives that can be utilized by customers ofmore » California's investor-owned utilities. Department of Energy (DOE) Tribal Energy Program funding allowed ACBCI to complete its next logical step to implement its Strategic Energy Plan, consistent with its energy and sustainability goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Okladnikova, N.; Pesternikova, V.; Sumina, M.
1998-12-01
Phase 1 of Project 2.3, a short-term collaborative Feasibility Study, was funded for 12 months starting on 1 February 1996. The overall aim of the study was to determine the practical feasibility of using the dosimetric and clinical data on the MAYAK worker population to study the deterministic effects of exposure to external gamma radiation and to internal alpha radiation from inhaled plutonium. Phase 1 efforts were limited to the period of greatest worker exposure (1948--1954) and focused on collaboratively: assessing the comprehensiveness, availability, quality, and suitability of the Russian clinical and dosimetric data for the study of deterministic effects;more » creating an electronic data base containing complete clinical and dosimetric data on a small, representative sample of MAYAK workers; developing computer software for the testing of a currently used health risk model of hematopoietic effects; and familiarizing the US team with the Russian diagnostic criteria and techniques used in the identification of Chronic Radiation Sickness.« less
CarbonSAFE Illinois - Macon County
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whittaker, Steve
CarbonSAFE Illinois is a a Feasibility study to develop an established geologic storage complex in Macon County, Illinois, for commercial-scale storage of industrially sourced CO2. Feasibility activities are focused on the Mt. Simon Storage Complex; a step-out well will be drilled near existing storage sites (i.e., the Midwest Geological Sequestration Consortium’s Illinois Basin – Decatur Project and the Illinois Industrial Carbon Capture and Storage Project) to further establish commercial viability of this complex and to evaluate EOR potential in a co-located oil-field trend. The Archer Daniels Midland facility (ethanol plant), City Water, Light, and Power in Springfield, Illinois (coal-fired powermore » station), and other regional industries are potential sources of anthropogenic CO2 for storage at this complex. Site feasibility will be evaluated through drilling results, static and dynamic modeling, and quantitative risk assessment. Both studies will entail stakeholder engagement, consideration of infrastructure requirements, existing policy, and business models. Project data will help calibrate the National Risk Assessment Partnership (NRAP) Toolkit to better understand the risks of commercial-scale carbon storage.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
...), proposing to study the feasibility of the Two Girls Creek Hydroelectric Project (Two Girls Creek Project or project) to be located on Two Girls Creek, near Sweet Home, Linn County, Oregon. The project would occupy...-diameter HDPE tailrace returning flows to Two Girls Creek above a natural fish barrier; and (5) a new 12...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M.; Hadjerioua, Boualem; Martinez, Rocio
The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment,more » and may offer a path to reducing the project development cycle from inception to commissioning.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13315-001] Yegua Mesa Hydro... Intervene, and Competing Applications On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a... studying the feasibility of the Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or...
The Feasibility of Determining Success Criteria for Educational Research and Development Projects.
ERIC Educational Resources Information Center
Ball, Rodney J.; Cook, Desmond L.
The determination of final success of educational research and development projects is an important problem for those concerned with project management and evaluation. The purpose of this study was twofold: (a) to determine if schedule, cost, quality/performance, follow-on work, spin-off benefits, and customer/client satisfaction were given a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-10-01
The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. The report presents the results of a market survey done on products from TOR.
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shrivastava, V.K.; Sandell, D.H.
The Government of Thailand is implementing a Southern Seaboard Development Project. The developing of the project will increase demand for all utility and infrastructure systems and services. The distribution of electric power in the new area falls within the responsibility of the Provincial Electricity Authority (PEA). The U.S. Trade and Development Program (TDP) funded a Definitional Mission to evaluate the prospects of TDP funding a feasibility study for an I-Shaped power interconnection study for supplying electricity to the 15 provinces in Southern Thailand. The mission concluded that TDP should provide a grant to PEA to select a U.S. firm tomore » carry out the proposed I-Shaped Interconnection study for power distribution in southern Thailand. The overall potential for exports resulting from the project is conservatively estimated at $120 million, not including any follow-on work and spare parts inventory, typical of such projects. TDP's program in Thailand has enjoyed enviable success in exports and TDP's support of the proposed feasibility study will clearly maintain and very likely add to that momentum.« less
DOT National Transportation Integrated Search
2003-05-01
This research project studied the feasibility as well as the scientific validity and utility of performing functional capacity screening with older drivers. A Model Program was described encompassing procedures to detect functionally impaired drivers...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
..., proposing to study the feasibility of the George W. Andrews Lock and Dam Hydroelectric Project. The proposed project would be located at the existing George W. Andrews Lock and Dam on the Chattahoochee River in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
The Tema Oil Refinery, which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years, some of the equipment in the refinery has deteriorated or become obsolete, necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. This report is appendix I, part A to the feasibility study.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
The Tema Oil Refinery, which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years, some of the equipment in the refinery has deteriorated or become obsolete, necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. This report is appendix I, part B to the feasibility study.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
..., Special Interest Project (SIP)13-067; and Feasibility Study of the New Clinical Measure of Colorectal... Determination of the Director, Management Analysis and Services Office, CDC, pursuant to Public Law 92-463... ``Understanding the Barriers to Colorectal Cancer Screening among Asian Subgroups, SIP13-067; and Feasibility...
DOT National Transportation Integrated Search
1987-04-01
The general objective of the project was to determine the feasibility of and the general requirements for a centralized database on driver behavior and attitudes related to drunk driving and occupant restraints. Volume III is a compendium of question...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
..., engineering or design work and purchasing existing facilities or right-of-way. 3. Livability: Increasing... Feasibility: The technical feasibility of the project should be demonstrated by engineering and design studies and activities; the development of design criteria and/or a basis of design; the basis for the cost...
DOT National Transportation Integrated Search
1987-04-24
The general objective of the project was to determine the feasibility of and the general requirements for a centralized database on driver behavior and attitudes related to drunk driving and occupant restraints. Volume I assesses the extent of pertin...
Feasibility of Using Plastic Pipe for Ethanol Low Stress Lines
DOT National Transportation Integrated Search
2010-05-28
This USDOT PHMSA sponsored research project addressed and successfully determined the initial feasibility of using new materials, both polymeric and composites, as low-cost alternatives to specially designed metallic gathering pipelines. The project ...
Low/medium-Btu coal-gasification feasibility study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-11-01
This study examines the feasibility of applying the concepts of Coal Gasification and Combined Cycle Technology to the re-powering of existing steam turbine-electric generating facilities. The primary objectives of this study include: (1) the determination of the feasibility of designing a technically sound system embodying this technology; (2) the determination of the potential for displacing foreign oil by the project; (3) the identificaton of any constraints and/or barriers that might impede the accomplishment of such a project; and (4) the evaluation of the potential benefits of such a system. Although the system is designed around the use of commercially available,more » state-of-the-art components and equipment, a completely integrated, electric generating plant, such as is being proposed here, has not yet been demonstrated. However, the designs developed as part of this study combine these components, utilizing well developed and technically sound concepts in such a way as to provide a reasonable degree of confidence in the workability of the total system. This study offers the potential for reducing oil dependency; the possibility of improving cycle efficiency and extending the useful life of existing facilities; the feasibility of re-vitalizing a facility located within a major load center; and presents some attractive possibilities for a co-generation, district heating application in the central portions of Bridgeport. Although the results of the study produce a number of clear conclusions, they also stimulate additional questions, the resolution of which would require further study and more detailed design. The final resolution of these questions that still remain may have a significant effect on the final conclusions concerning the viability of this project, and it is for this reason that further study is required.« less
ERIC Educational Resources Information Center
Association of Physical Plant Administrators of Universities and Colleges, Washington, DC.
This feasibility study was made to determine the impact of agencies and organizations that review and apply codes and standards to new construction and major renovation projects affecting the ability of colleges and universities to use and conserve energy. The program involved a survey of four representative states--California for a moderate…
ERIC Educational Resources Information Center
Piuma, Chesca
This study investigated the feasibility of developing five vocational education curricula for severely handicapped (i.e., trainable mentally retarded) young people, aged 13 to 21, that would enable them to work in the employment areas of gardening, housekeeping, laundry services, food services, and minor auto maintenance. One goal of the project…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.
NASA Astrophysics Data System (ADS)
Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng
2017-06-01
Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.
Feasibility of new simulation technology to train novice drivers
DOT National Transportation Integrated Search
1996-12-01
This project examined the feasibility of using existing simulation and other electronic device technology with the potential for the safety training of novice drivers. Project activities included: a literature review; site visits and telephone inquir...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2012 CFR
2012-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2010 CFR
2010-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2011 CFR
2011-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...
Solar Thermal Power Systems parabolic dish project
NASA Technical Reports Server (NTRS)
Truscello, V. C.
1981-01-01
The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.
Determine feasible and acceptable age 21 support programs
DOT National Transportation Integrated Search
1990-09-01
The objective of this project was to identify programs which are feasible, acceptable, and effective in deterring adolescent drinking. To begin the project, information was collected on 22 prevention programs using a wide range of approaches. Next, a...
Manufacturing Education Curriculum Project.
ERIC Educational Resources Information Center
Umstattd, William D.
The Manufacturing Education Curriculum Project's feasibility study concerned with industrial arts curriculum development in manufacturing for the senior high school level is described. The need for an industrial arts curriculum which meets and reflects present and future trends is discussed in the introduction, followed by a review of the…
Feasibility of Summer Employment of Teachers.
ERIC Educational Resources Information Center
Clark County School District, Las Vegas, NV.
A teacher staff of 21 was employed for 6 to 8 weeks during the summers of 1967, 1968, and 1969 at Virgin Valley, Nevada, with funding provided by the Elementary and Secondary Education Act (Title III). The purpose of the study was to determine the feasibility of summer employment for teachers by the school system. Project design called for 3…
LST CGM Generator and Viewer Final Report CRADA No. TSB-1558-98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vickers, Don; Larson, Don
The purpose of this project was to jointly develop and test a software plug-in that would convert native Pro /ENGINEER digital engineering drawings to Computer Graphics Metafile (CGM) format. If it was not feasible to convert the Pro/ENGINEER files, we planned to develop and test a similar conversion of native AutoCAD engineering drawings to CGM. CGM viewer plug-ins were developed as needed. There were four main tasks in this project: 1. Requirements for CGM Plug-in 2. Product Evaluation 3. Product Development Feasibility Study 4. Developing a "Plug-In" Application.
ERIC Educational Resources Information Center
Lanham, Frank W.
The purpose of this study was to explore the feasibility of utilizing the systems approach in developing an office occupations curriculum congruent with the concepts in the organic curriculum theory. The title of this project is New Office and Business Education Learning System (NOBELS). An analog system model was developed as the framework in…
Economic feasibility of solar thermal industrial applications and selected case studies
NASA Astrophysics Data System (ADS)
Montelione, A.; Boyd, D.; Branz, M.
1981-12-01
The economic feasibility is assessed of utilizing solar energy to augment an existing fossil fuel system to generate industrial process heat. Several case studies in the textile and food processing industries in the southern United States were analyzed. Sensitivity analyses were performed, and comparisons illustrating the effects of the Economic Recovery Tax Act of 1981 were made. The economic desirability of the proposed solar systems varied with the type of system selected, location of the facility, state tax credits, and type of fuel displaced. For those systems presently not economical, the projected time to economic feasibility was ascertained.
Rural jail telepsychiatry: a pilot feasibility study.
Manfredi, Luisa; Shupe, Joann; Batki, Steven L
2005-10-01
New York State has a large rural population, and many of the jails in rural areas have minimal or no psychiatric services available on site. Cost of transport to off-site psychiatric services and the safety issues related to moving inmates from a secure building may limit inmate access to appropriate psychiatric services. This feasibility study describes a project that provided telepsychiatric consultation to increase access to psychiatric treatment in an underserved rural jail in upstate New York. Subjects were consenting jail inmates who requested or were found to be in need of psychiatric care. The project provided interactive two-way audio-video communication between the psychiatrist located in an urban university medical center and subjects who were incarcerated 182 miles away. During the project period, 15 inmates were assessed and treated in 37 consultations. Subjects were predominantly young white males with anxiety, mood, and substance use disorders. Services were readily accepted by inmates and staff. Telepsychiatric examination and treatment appears to be a feasible method to increase access to mental health care in rural jails. Future advocacy for increased mental health services in rural areas in criminal justice setting is likely to depend on further evidence of favorable cost benefit.
Aleutian Pribilof Islands Wind Energy Feasibility Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruce A. Wright
2012-03-27
Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy optionsmore » for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14538-000] Go With the Flow..., Motions To Intervene, and Competing Applications On July 22, 2013, Go with the Flow Hydro Power, LLC...), proposing to study the feasibility of the Go with the Flow Hydroelectric Project (project) to be located on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
... an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Igiugig RISEC Water Power Project (Igiugig Project or project), to... proposed transmission line that will either connect directly to the IVC diesel power plant or a 1,000-foot...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... to study the feasibility of the Mississippi Lock and Dam No. 18 Water Power Project (L&D 18 Project... Project would consist of: (1) Twenty-four very-low-head turbine-generator units that would have a... reinforced concrete structure enclosing the turbine-generator units and having a top of deck elevation of 528...
A financing model to solve financial barriers for implementing green building projects.
Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.
A Financing Model to Solve Financial Barriers for Implementing Green Building Projects
Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379
ERIC Educational Resources Information Center
Granville, Arthur; And Others
This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-27
... study the feasibility of the Half Moon Cove Tidal Power Plant Project to be located in Half Moon Cove.... The proposed project would consist of: (1) The existing 544-acre Half Moon Cove; (2) a new 410-foot...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2014 CFR
2014-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2013 CFR
2013-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
43 CFR 404.2 - What terms are used in this part?
Code of Federal Regulations, 2012 CFR
2012-10-01
..., primarily using existing data. An appraisal investigation includes a preliminary assessment of alternatives... project sponsor to carry out a public purpose of support or stimulation authorized by law. For purposes of... project should be authorized for construction. Feasibility study means a detailed investigation requiring...
Project 0-6749 : feasibility study of two-lift concrete paving : [project summary].
DOT National Transportation Integrated Search
2013-08-01
Two-lift concrete paving (2LCP) involves placing two layers of : concrete (wet-on-wet) instead of a single homogeneous layer, as is : typically done in the United States. 2LCP offers the opportunity to optimize the use of local aggregates and : recyc...
DOT National Transportation Integrated Search
2004-01-01
The road history projects undertaken by the Virginia Transportation Research Council establish the feasibility of studies of early road networks and their use in the environmental review process. These projects, by gathering and publishing the early ...
DOT National Transportation Integrated Search
1998-01-08
The CVISN Pilot Project will prototype the use of a comprehensive interface to state and federal motor carrier data systems and will deliver real-time, decision-making information to weigh stations and commercial vehicle enforcement officers. In addi...
Cherokee Wind Energy Development - Feasibility and Pre-Construction Studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMillan, Andy
Cherokee Nation Businesses (CNB) received a grant from the US Department of Energy to explore feasibility and pursue development of a wind power generation facility on Cherokee land in north-central Oklahoma. This project followed several years of initial study exploring the possibility of commercial-scale wind power generation on primarily agricultural land owned by the Cherokee Nation. This project produced detailed analysis of the legal, financial and market viability of such generation facilities, and encompassed a full technical evaluation of the engineering, environmental, and geotechnical aspects of installing this capacity. During the course of this project, information gleaned from this explorationmore » changed CNB’s thinking about the best course of action for Cherokee participation in the development, eventually moving away from an equity-owner model and towards utilization of the land asset as a resource while mitigating Cherokee financial and operational risk.« less
Formal Methods Tool Qualification
NASA Technical Reports Server (NTRS)
Wagner, Lucas G.; Cofer, Darren; Slind, Konrad; Tinelli, Cesare; Mebsout, Alain
2017-01-01
Formal methods tools have been shown to be effective at finding defects in safety-critical digital systems including avionics systems. The publication of DO-178C and the accompanying formal methods supplement DO-333 allows applicants to obtain certification credit for the use of formal methods without providing justification for them as an alternative method. This project conducted an extensive study of existing formal methods tools, identifying obstacles to their qualification and proposing mitigations for those obstacles. Further, it interprets the qualification guidance for existing formal methods tools and provides case study examples for open source tools. This project also investigates the feasibility of verifying formal methods tools by generating proof certificates which capture proof of the formal methods tool's claim, which can be checked by an independent, proof certificate checking tool. Finally, the project investigates the feasibility of qualifying this proof certificate checker, in the DO-330 framework, in lieu of qualifying the model checker itself.
NASA Technical Reports Server (NTRS)
Keating, Thomas; Ihara, Toshio; Miida, Sumio
1990-01-01
A cooperative United States/Japan study was made for one year from 1987 to 1988 regarding the feasibility of the Tropical Rainfall Measuring Mission (TRMM). As part of this study a phase-A-level design of spacecraft for TRMM was developed by NASA/GSFC, and the result was documented in a feasibility study. The phase-A-level design is developed for the TRMM satellite utilizing a multimission spacecraft.
Feasibility Study to Identify Potential Reductions in Energy Use in Tribal Buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stevens, Willie
Under this project, the Confederated Salish and Kootenai Tribes (CSKT) assessed the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The feasibility study followed a systematic approach in identifying, selecting, and ranking recommended measures, recognizing that the appropriateness of a measure would depend not only on technical issues but also on institutional and organizational issues, such as financing options and occupant requirements. The completed study provided the Tribes with the information needed to commit necessary resources to reduce the energy use and cost in approximately 40 Tribal buildings, including the changes that may be needed inmore » each facility’s operation and maintenance and personnel requirements. It also presented an economic analysis of energy-efficiency capital improvements and an annotated list of financing options and possible funding sources for implementation and an overall strategy for implementation. This project was located in various Tribal communities located throughout the Flathead Indian Reservation in Western Montana. Notice: The following is a compilation of Annual Program Review Presentations, Award Modifications, and Quarterly Progress Reports submitted to the Department of Energy’s (DOE) Office of Indian Energy Policy and Programs by the Confederated Salish and Kootenai Tribes under agreement DE-EE0005171. This report covers project activities from September 30, 2011 through December 31, 2014 and has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report which was not received by DOE from the project recipient.« less
ERIC Educational Resources Information Center
Chacko, Mariam R.; Markham, Christine; Thiel, Melanie; Crandall, Stacy M.; Peskin, Melissa F.; Shegog, Ross; Tortolero, Susan
2014-01-01
Background: This study examined the acceptability and feasibility of using a biological outcome measure to evaluate a school-based sexuality education program. Confidential field-delivered sexually transmitted infection (STI) testing by nonmedical field staff and STI treatment by medically trained field staff was assessed in off-campus and…
ERIC Educational Resources Information Center
Urban Inst., Washington, DC.
This last of a three-volume report of a study done to assess the feasibility of large-scale, countercyclical public job creation covers the findings regarding the priorities among projects, indirect employment effects, skill imbalances, and administrative issues; and summarizes the overall findings, conclusions, and recommendations. (Volume 1,…
ERIC Educational Resources Information Center
Cohen, Albert; Orzech, David
This project explored the feasibility for vocational rehabilitation of a perplexing group of patients awaiting separation from a state mental hospital. The patients were of dubious employability. The design was a series of sequential stages through which the 98 workshop participants passed, with attrition taking place at each stage. The program…
ERIC Educational Resources Information Center
Moroney, Jillian; Laninga, Tamara; Brooks, Randall
2016-01-01
The Northwest Advanced Renewables Alliance (NARA) is examining the feasibility of a woody biomass-to-biofuels supply chain in Idaho, Montana, Oregon, and Washington. A part of the ongoing feasibility study involved conducting a survey of informed stakeholders on the use of woody biomass from forest residuals in producing sustainable bioenergy.…
PRELIMINARY STUDY OF THE PRESSURE TRANSDUCER PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eldridge, A.J.
1956-08-01
A feasibility study is presented of the application of several commercially available pressure transducers for incorporation in a dynamic baro- switch tester or for use in a baro-switch application. (auth)
Husain, Nusrat; Gire, Nadeem; Kelly, James; Duxbury, Joy; McKeown, Mick; Riley, Miv; Taylor, Christopher Dj; Taylor, Peter J; Emsley, Richard; Farooq, Saeed; Caton, Neil; Naeem, Farooq; Kingdon, David; Chaudhry, Imran
2016-01-01
Technological advances in healthcare have shown promise when delivering interventions for mental health problems such as psychosis. The aim of this project is to develop a mobile phone intervention for people with psychosis and to conduct a feasibility study of the TechCare App. The TechCare App will assess participant's symptoms and respond with a personalised guided self-help-based psychological intervention with the aim of exploring feasibility and acceptability. The project will recruit 16 service users and 8-10 health professionals from the Lancashire Care NHS Foundation Trust Early Intervention Service. In strand 1 of the study, we will invite people to discuss their experience of psychosis and give their opinions on the existing evidence-based treatment (cognitive behavioural therapy) and how the mobile app can be developed. In strand 2, we will complete a test run with a small number of participants (n = 4) to refine the mobile intervention (TechCare). Finally, in strand 3 of the study, the TechCare App will be examined in a feasibility study with 12 participants. It has been suggested that there is a need for a rapid increase in the efforts to develop the evidence base for the clinical effectiveness of digital technologies, considering mHealth research can potentially be helpful in addressing the demand on mental health services globally.
33 CFR 263.18 - Program completion-time objectives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... submission of funding request or negative report to OCE 2 1 2 (b) Completion of feasibility study by... these objectives is encouraged for specific studies and projects when appropriate. However, high...
33 CFR 263.18 - Program completion-time objectives.
Code of Federal Regulations, 2011 CFR
2011-07-01
... submission of funding request or negative report to OCE 2 1 2 (b) Completion of feasibility study by... these objectives is encouraged for specific studies and projects when appropriate. However, high...
A High-Throughput Microenvironment for Single-Cell Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christian, A T; Buckley, P; Miles, R R
2003-01-07
This project was conducted as a feasibility study, in preparation for including this work in the forthcoming ''Instrumented Cell'' (IC) Strategic Initiative. The goal of the IC is to study individual cells; the goal of this feasibility study was to determine the best method for isolating large numbers of individual cells in a way that facilitates various types of environmental changes and intracellular measurements. We have the capability to do this with one cell, and sought to expand the number of cells that we could study simultaneously. Our specific goal for this feasibility study was to discover a way tomore » isolate individual cells, and impale them on a nanopipette. This would enable samples to be introduced into and removed from a cell.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-07-01
The report presents the results of a feasibility study for the National Load Dispatch Center and Global Communications System Project in Guatemala. The project consists of a communication system which will provide Institute Nacional de Electrificacion (INDE) operations personnel direct voice access to all major power system facilities. In addition, a modern computer based load dispatch center has been configured on a secure and reliable basis to provide automatic generation control of all major interconnected generating plants within Guatemala.
The NAIMS cooperative pilot project: Design, implementation and future directions.
Oh, Jiwon; Bakshi, Rohit; Calabresi, Peter A; Crainiceanu, Ciprian; Henry, Roland G; Nair, Govind; Papinutto, Nico; Constable, R Todd; Reich, Daniel S; Pelletier, Daniel; Rooney, William; Schwartz, Daniel; Tagge, Ian; Shinohara, Russell T; Simon, Jack H; Sicotte, Nancy L
2017-10-01
The North American Imaging in Multiple Sclerosis (NAIMS) Cooperative represents a network of 27 academic centers focused on accelerating the pace of magnetic resonance imaging (MRI) research in multiple sclerosis (MS) through idea exchange and collaboration. Recently, NAIMS completed its first project evaluating the feasibility of implementation and reproducibility of quantitative MRI measures derived from scanning a single MS patient using a high-resolution 3T protocol at seven sites. The results showed the feasibility of utilizing advanced quantitative MRI measures in multicenter studies and demonstrated the importance of careful standardization of scanning protocols, central image processing, and strategies to account for inter-site variability.
Numerical aerodynamic simulation facility feasibility study, executive summary
NASA Technical Reports Server (NTRS)
1979-01-01
There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability, reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-03-01
The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project ismore » economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.« less
Environmental pollution and shipping feasibility of the Nicaragua Canal.
Chen, Jihong; Zeng, Xin; Deng, Yibing
2016-12-15
In recent years, the Nicaraguan government's renewed interest in constructing this interoceanic canal has once again aroused widespread concern, particularly in the global shipping industry. The project's immense ecological risks, coupled with the recent expansions of both the Panama Canal and the Suez Canal, have raised questions among scientists and experts about its viability. Whether the Nicaragua Canal is really feasible for international shipping, given its high marine pollution risks, requires the further study. This paper discusses and analyses the feasibility of the Nicaragua Canal in the context of its environmental impact and value as a shipping service. This paper aims to provide an important information reference to inform strategic decision-making among policymakers and stakeholders. Our research results indicate that the environmental complexity, economic costs and safety risks of building a new transoceanic canal are simply too high to justify the project. Copyright © 2016 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Guthrie, Robert V.; And Others
A study was made to test the feasibility of a small college (located some distance from a city) establishing a residence unit within a slum or transitional area of a city. The purposes of such a program, in which students and faculty live in the city while continuing their normal course work, would be to: (1) enhance the curriculum by broadening…
Long-range eye tracking: A feasibility study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jayaweera, S.K.; Lu, Shin-yee
1994-08-24
The design considerations for a long-range Purkinje effects based video tracking system using current technology is presented. Past work, current experiments, and future directions are thoroughly discussed, with an emphasis on digital signal processing techniques and obstacles. It has been determined that while a robust, efficient, long-range, and non-invasive eye tracking system will be difficult to develop, such as a project is indeed feasible.
MINIPILOT SOLAR SYSTEM: DESIGN/OPERATION OF SYSTEM AND RESULTS OF NON-SOLAR TESTING AT MRI
Prior to this project, MRI had carried out work for the Environmental Protection Agency (EPA) on the conceptual design of a solar system for solid waste disposal and a follow-on project to study the feasibility of bench-scale testing of desorption of organics from soil with destr...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14109-000] Oregon Winds..., Motions To Intervene, and Competing Applications On March 11, 2011, Oregon Winds Hydro, LLC filed an... study the feasibility of the Oregon Winds Pumped Storage Project to be located on the John Day River...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Competing Applications; McKay Dam Hydropower, LLC On May 31, 2011, McKay Dam Hydropower, LLC filed an... study the feasibility of the McKay Dam Hydroelectric Project (project) to be located at the McKay dam near Pendleton in Umatilla County, [[Page 57732
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... with the project. Applicant Contact: Daniel R. Irvin, Free Flow Power Corporation, 33 Commercial Street... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13876-000] South Run Pumped... the Federal Power Act (FPA), proposing to study the feasibility of the South Run Pumped Storage...
1985-11-01
Public Utilities Regulatory Policies Act ( PURPA ) criteria for classification as a "Qualifying Facility" (QF). 11. Visual effect of intermittent...the public utility of electric power produced by the cogenerator. The operating standard of PURPA requires that a new QF must produce at least 5% of
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13863-000] Mount Storm..., Motions To Intervene, and Competing Applications January 6, 2011. On October 14, 2010, Mount Storm Hydro... (FPA), proposing to study the feasibility of the Mount Storm Pumped Storage Project to be located near...
Systematic Evaluation of the "Forests in Schools" (SIS) Project.
ERIC Educational Resources Information Center
School Research Newsletter, 1985
1985-01-01
The purpose of an inquiry was to study the feasibility, content, mediation, and results of the Swedish "Forests in Schools" (SIS) project, an example of a link between schools and working life (the latter represented by forest enterprise in general). It also sought to describe and, if possible, explain the effects of the activities…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allgood, Tiffany L.; Sorter, Andy
The Coeur d'Alene Tribe's Energy Efficiency Feasibility Study (EEFS) is the culminating document that compiles the energy efficiency and building performance assessment and project prioritization process completed on 36 Tribally owned and operated facilities within Tribal lands. The EEFS contains sections on initial findings, utility billing analyses, energy conservation measures and prioritization and funding sources and strategies for energy project implementation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14291-000] Green Wave Mendocino Wave Park; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Green Wave Mendocino Wave Park (Mendocino Wave Project...
Steil, C; Meiler, B; Wiesten, I; Wiltfang, J; Kis, B
2013-08-01
The aim of this study is to implement and examine the feasibility of a cross-institutional mental health intervention to comprehend and advance mental health of elderly long-term unemployed persons. Report on the procedure and on the observational study utilisation in a 14-month period. The structure and processes chosen could be implemented into practice successfully. Utilisation was high but 30% dropped out during the procedure. Of the unemployed persons surveyed, 96% received a psychiatric diagnosis. 85% were not having psychiatric treatment. The method chosen is feasible and was accepted by the target group. Project structure and processes proved to be applicable for the implementation of the project aims. The method chosen reaches an up to now "psychiatry-inexperienced" target group characterised by frequent incidence of mental disorders and low utilisation of psychiatric care. Thus, vocational reintegration programmes should be supported by psychiatric services. © Georg Thieme Verlag KG Stuttgart · New York.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nominelli, Gregg R.
The Keweenaw Bay Indian Community (KBIC) is committed to preserving our natural environment and reducing the amount of fossil fuels consumed while developing "green" business manufacturing jobs on tribal lands. The Tribe's Comprehensive Strategic Plan seeks to diversify the Tribal Economy through the creation of alternative energy businesses, such as wind, solar and bio-mass facilities while protecting the waters of Lake Superior, tribal inland lakes and streams. In addition, the Community desired to utilize clean/green energy resources to promote the self-sufficiency of the Tribal Nation. The objective of the study is to preserve our environment and maintain our cultural goalsmore » of using the resources of the land wisely. To reduce our consumption of fossil fuels, mercury and carbon dioxide emissions, which harm our water and land; we have decided to evaluate the opportunities of utilizing wind power. Preliminary projections show that we may eliminate pollution from our land in a cost effective manner. This study will evaluate wind capacity and our current energy consumption while projecting the feasibility of converting to wind power for operations at our major facilities. This project will study the feasibility of wind power at two locations for the purpose of reducing the Tribe's reliance upon fossil fuels and creating business opportunities, jobs and revenue for the community.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Penfold, S; Casiraghi, M; Dou, T
2015-06-15
Purpose: To investigate the applicability of feasibility-seeking cyclic orthogonal projections to the field of intensity modulated proton therapy (IMPT) inverse planning. Feasibility of constraints only, as opposed to optimization of a merit function, is less demanding algorithmically and holds a promise of parallel computations capability with non-cyclic orthogonal projections algorithms such as string-averaging or block-iterative strategies. Methods: A virtual 2D geometry was designed containing a C-shaped planning target volume (PTV) surrounding an organ at risk (OAR). The geometry was pixelized into 1 mm pixels. Four beams containing a subset of proton pencil beams were simulated in Geant4 to provide themore » system matrix A whose elements a-ij correspond to the dose delivered to pixel i by a unit intensity pencil beam j. A cyclic orthogonal projections algorithm was applied with the goal of finding a pencil beam intensity distribution that would meet the following dose requirements: D-OAR < 54 Gy and 57 Gy < D-PTV < 64.2 Gy. The cyclic algorithm was based on the concept of orthogonal projections onto half-spaces according to the Agmon-Motzkin-Schoenberg algorithm, also known as ‘ART for inequalities’. Results: The cyclic orthogonal projections algorithm resulted in less than 5% of the PTV pixels and less than 1% of OAR pixels violating their dose constraints, respectively. Because of the abutting OAR-PTV geometry and the realistic modelling of the pencil beam penumbra, complete satisfaction of the dose objectives was not achieved, although this would be a clinically acceptable plan for a meningioma abutting the brainstem, for example. Conclusion: The cyclic orthogonal projections algorithm was demonstrated to be an effective tool for inverse IMPT planning in the 2D test geometry described. We plan to further develop this linear algorithm to be capable of incorporating dose-volume constraints into the feasibility-seeking algorithm.« less
Mander, Rosemary; Cheung, Ngai Fen; Wang, Xiaoli; Fu, Wei; Zhu, Junghong
2010-02-01
To explore issues arising during preliminary stages of a research project in order to consider the feasibility of a midwife-led normal birthing unit in mainland China. Midwife-led normal birthing units, as a route to ensuring normality, have become a feature of western maternity care, but are unknown in China. Action research, using a qualitative descriptive approach, was performed. Data were collected at meetings, by non-participant observation and by face-to-face semi-structured interviews. Observation was undertaken in the midwife-led normal birthing unit and a standard care setting. Data analysis was by thematic analysis using constant comparison techniques. In the labour ward of a large general hospital in a major city, stakeholders included midwifery staff, managers, university staff and researchers. Childbearing women proved keen to use this service, but were unable to participate in the planning. The midwife-led normal birthing unit sought to provide one-to-one care in labour and support by a birth companion. Routine interventions were to be avoided. The midwives in the midwife-led normal birthing unit created a more suitable environment for supportive care. The midwives demonstrated high-quality communication skills. The woman's choice of position/mobility was limited. Difficulties with staffing were identified. The preliminary findings suggest that continuation of the project is feasible. The woman's role demonstrates passivity. The perception of staff shortage has serious implications. This action research project suggests that a study of a midwife-led normal birthing unit in China is feasible, with some attention to staffing issues.
43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...
Tupasi, Thelma E; Gupta, Rajesh; Quelapio, Ma Imelda D; Orillaza, Ruth B; Mira, Nona Rachel; Mangubat, Nellie V; Belen, Virgil; Arnisto, Nida; Macalintal, Lualhati; Arabit, Michael; Lagahid, Jaime Y; Espinal, Marcos; Floyd, Katherine
2006-01-01
Background Multidrug-resistant tuberculosis (MDR-TB) is an important global health problem, and a control strategy known as DOTS-Plus has existed since 1999. However, evidence regarding the feasibility, effectiveness, cost, and cost-effectiveness of DOTS-Plus is still limited. Methodology/Principal Findings We evaluated the feasibility, effectiveness, cost, and cost-effectiveness of a DOTS-Plus pilot project established at Makati Medical Center in Manila, the Philippines, in 1999. Patients with MDR-TB are treated with regimens, including first- and second-line drugs, tailored to their drug susceptibility pattern (i.e., individualised treatment). We considered the cohort enrolled between April 1999 and March 2002. During this three-year period, 118 patients were enrolled in the project; 117 were considered in the analysis. Seventy-one patients (61%) were cured, 12 (10%) failed treatment, 18 (15%) died, and 16 (14%) defaulted. The average cost per patient treated was US$3,355 from the perspective of the health system, of which US$1,557 was for drugs, and US$837 from the perspective of patients. The mean cost per disability-adjusted life year (DALY) gained by the DOTS-Plus project was US$242 (range US$85 to US$426). Conclusions Treatment of patients with MDR-TB using the DOTS-Plus strategy and individualised drug regimens can be feasible, comparatively effective, and cost-effective in low- and middle-income countries. PMID:16968123
Tupasi, Thelma E; Gupta, Rajesh; Quelapio, Ma Imelda D; Orillaza, Ruth B; Mira, Nona Rachel; Mangubat, Nellie V; Belen, Virgil; Arnisto, Nida; Macalintal, Lualhati; Arabit, Michael; Lagahid, Jaime Y; Espinal, Marcos; Floyd, Katherine
2006-09-01
Multidrug-resistant tuberculosis (MDR-TB) is an important global health problem, and a control strategy known as DOTS-Plus has existed since 1999. However, evidence regarding the feasibility, effectiveness, cost, and cost-effectiveness of DOTS-Plus is still limited. We evaluated the feasibility, effectiveness, cost, and cost-effectiveness of a DOTS-Plus pilot project established at Makati Medical Center in Manila, the Philippines, in 1999. Patients with MDR-TB are treated with regimens, including first- and second-line drugs, tailored to their drug susceptibility pattern (i.e., individualised treatment). We considered the cohort enrolled between April 1999 and March 2002. During this three-year period, 118 patients were enrolled in the project; 117 were considered in the analysis. Seventy-one patients (61%) were cured, 12 (10%) failed treatment, 18 (15%) died, and 16 (14%) defaulted. The average cost per patient treated was US3,355 dollars from the perspective of the health system, of which US1,557 dollars was for drugs, and US837 dollars from the perspective of patients. The mean cost per disability-adjusted life year (DALY) gained by the DOTS-Plus project was US242 dollars (range US85 dollars to US426 dollars). Treatment of patients with MDR-TB using the DOTS-Plus strategy and individualised drug regimens can be feasible, comparatively effective, and cost-effective in low- and middle-income countries.
31 CFR 26.5 - Upgrades and additional environmental information.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., such environmental information from the MDB (e.g., environmental chapters from project feasibility studies or environmental data sheets) which contains this environmental analysis. The MDB Office will...
1983-12-01
therefore, any possible changes in floodplain regulation would be independent of project implementation. The existing regulation affects properties...to 0.4. Based on engineering experience there is a tendency toward independence as tributary drainage area size decreases. Frequency-discharge...stages on the Wisconsin River. Similarly the storage areas are analyzed as independent syste,, o thereby, reduction in flood elevations (routing) and
Numerical aerodynamic simulation facility feasibility study
NASA Technical Reports Server (NTRS)
1979-01-01
There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year. Facets of the work described include the hardware configuration, software, user language, and fault tolerance.
The development of the Project NetWork administrative records database for policy evaluation.
Rupp, K; Driessen, D; Kornfeld, R; Wood, M
1999-01-01
This article describes the development of SSA's administrative records database for the Project NetWork return-to-work experiment targeting persons with disabilities. The article is part of a series of papers on the evaluation of the Project NetWork demonstration. In addition to 8,248 Project NetWork participants randomly assigned to receive case management services and a control group, the simulation identified 138,613 eligible nonparticipants in the demonstration areas. The output data files contain detailed monthly information on Supplemental Security Income (SSI) and Disability Insurance (DI) benefits, annual earnings, and a set of demographic and diagnostic variables. The data allow for the measurement of net outcomes and the analysis of factors affecting participation. The results suggest that it is feasible to simulate complex eligibility rules using administrative records, and create a clean and edited data file for a comprehensive and credible evaluation. The study shows that it is feasible to use administrative records data for selecting control or comparison groups in future demonstration evaluations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13828-000] FFP Mass 1, LLC... study the feasibility of the Cape Cod Tidal Energy Project to be located in the Cape Cod Canal and a...,000 hydrokinetic tidal devices consisting of a turbine blade assembly and an integrated 10-kilowatt...
A study on integrating surveys of terrestrial natural resources: The Oregon Demonstration Project
J. Jeffery Goebel; Hans T. Schreuder; Carol C. House; Paul H. Geissler; Anthony R. Olsen; William Williams
1998-01-01
An interagency project demonstrated the feasibility of integrating Federal surveys of terrestrial natural resources and offers a vision for that integration. At locations selected from forest inventory and analysis, National forest system Region 6, and national resources inventory surveys in a six-county area in Northern Oregon, experienced teams interpreted and made...
33 CFR 220.1 - Low level discharge facilities for drawdown of impoundments.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Feasibility (survey) reports and subsequent pertinent design memoranda should include the results of studies..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DESIGN CRITERIA FOR DAM AND LAKE PROJECTS § 220.1 Low level... responsibility for design of Civil Works projects. (c) Policy. It is the policy of the Chief of Engineers that...
33 CFR 220.1 - Low level discharge facilities for drawdown of impoundments.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Feasibility (survey) reports and subsequent pertinent design memoranda should include the results of studies..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DESIGN CRITERIA FOR DAM AND LAKE PROJECTS § 220.1 Low level... responsibility for design of Civil Works projects. (c) Policy. It is the policy of the Chief of Engineers that...
33 CFR 220.1 - Low level discharge facilities for drawdown of impoundments.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... Feasibility (survey) reports and subsequent pertinent design memoranda should include the results of studies..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DESIGN CRITERIA FOR DAM AND LAKE PROJECTS § 220.1 Low level... responsibility for design of Civil Works projects. (c) Policy. It is the policy of the Chief of Engineers that...
33 CFR 220.1 - Low level discharge facilities for drawdown of impoundments.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Feasibility (survey) reports and subsequent pertinent design memoranda should include the results of studies..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DESIGN CRITERIA FOR DAM AND LAKE PROJECTS § 220.1 Low level... responsibility for design of Civil Works projects. (c) Policy. It is the policy of the Chief of Engineers that...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... (Snohomish PUD) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Deception Pass Tidal Energy Project (project). The... consist of the following: (1) Four approximately 66-foot-diameter, 1.6-megawatt horizontal axis tidal...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Homeowner Tidal Power Electric Generation Project to be located in.... The proposed project would consist of: (1) 10 hydrokinetic turbine units with an estimated total...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project, which would be located on the Long Island...' express permission. The proposed project would consist of: (1) Installation of 50 NC Sea Dragon tidal...
ERIC Educational Resources Information Center
Terrazas-Arellanes, Fatima E.; Knox, Carolyn; Walden, Emily
2015-01-01
The 2006 National Science Board called for new strategies and instructional materials for teachers to better serve English Learners' (EL) needs. Bilingual Collaborative Online Projects in science were created to assist ELs' construction of science knowledge, facilitate academic English acquisition, and improve science learning. Two bilingual…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-21
... study the feasibility of the Nenana RivGen Power Project (Nenana Project) to be located on the Tanana... RivGen turbine-generator modules with a combined capacity of 300 kilowatts; (2) an approximately 450... north bank of the Tanana River, or an alternate transmission cable configuration that is yet to be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13880-000] Cuffs Run Pumped..., Motions To Intervene, and Competing Applications On November 18, 2010, Cuffs Run Pumped Storage, LLC filed... to study the feasibility of the Cuffs Run Pumped Storage Project, located on Cuffs Run and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... generator; (3) a concrete tailrace releasing water into the river downstream of the dam; (4) a switchyard... study the feasibility of the Peoria Dam, Illinois--Hydroelectric Water Power Project (Peoria Dam Project...-long, 50-foot-wide, 55-foot-high powerhouse containing two horizontal Kaplan pit turbines each with a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12749-002] Oregon Wave...) of the Federal Power Act, proposing to study the feasibility of the Coos Bay OPT Wave Park Project... Comments, Motions To Intervene, and Competing Applications April 16, 2010. On March 2, 2010, Oregon Wave...
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
Model driver screening and evaluation program. Volume 2, Maryland pilot older driver study
DOT National Transportation Integrated Search
2003-05-01
This research project studied the feasibility as well as the scientific validity and utility of performing functional capacity screening with older drivers. A Model Program was described encompassing procedures to detect functionally impaired drivers...
Case study of 4(f) litigation/rulings.
DOT National Transportation Integrated Search
2004-06-01
This study addresses issues related to compliance with Section 4(f). By referring to the manual Cabinet employees will be to: 1) Conduct an assessment of proposed alternatives to evaluate prudence and feasibility of a proposed project alternative; 2)...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Folkedahl, Bruce
Much attention has been focused on renewable energy use in large-scale utilities and very small scale distributed energy systems. However, there is little information available regarding renewable energy options for midscale municipal utilities. The Willmar Municipal Utilities Corn Cob-Coal Co-Combustion Project was initiated to investigate opportunities available for small to midscale municipal utilities to "go green". The overall goal of the Project was to understand the current renewable energy research and energy efficiency projects that are or have been implemented at both larger and smaller scale and determine the applicability to midscale municipal utilities. More specific objectives for Task 2.0more » of this project were to determine the technical feasibility of co-combusting com cobs with coal in the existing WMU boiler, and to identify any regulatory issues that might need to be addressed if WMU were to obtain a significant portion of its heat from such co-combustion. This report addresses the issues as laid out in the study proposal. The study investigated the feasibility of and demonstrated the technical effectiveness of co-combusting corn cobs with coal in the Willmar Municipal Utilities stoker boiler steam generation power plant. The results of the WMU Co-Combustion Project will serve as a model for other midscale utilities who wish to use corn cobs to generate renewable electrical energy. As a result of the Co-Combustion Project, the WMU plans to upgrade their stoker boiler to accept whole corn cobs as well as other types of biomass, while still allowing the fuel delivery system to use 100% coal as needed. Benefits of co-combustion will include: energy security, reduced Hg and CO 2 air emissions, improved ash chemistry, potential future carbon credit sales, an immediate positive effect on the local economy, and positive attention focused on the WMU and the City of Willmar. The first step in the study was to complete a feasibility analysis. The feasibility analysis anticipated only positive results from the combustion of corn cobs with coal in the WMU power plant boiler, and therefore recommended that the project proceed. The study proceeded with a review of the existing WMU Power Plant configuration; cob fuel analyses; an application for an Air Quality Permit from the Minnesota Pollution Control Agency to conduct the co-combustion test burns; identification of and a site visit to a similar facility in Iowa; an evaluation of cob grinding machines; and agreements with a corn grower, a cob harvester, and the City of Willmar to procure, harvest, and store cobs. The WMU power plant staff constructed a temporary cob feed system whereby the cobs could be injected into the #3 Boiler firebox, at rates up to 40% of the boiler total heat input. Test burns were conducted, during which air emissions were monitored and fuel and ash samples analyzed. The results of the test burns indicated that the monitored flue gas quality improved slightly during the test burns. The WMU was able to determine that modifications to the #3 Boiler fuel feed system to accept com cobs on a permanent basis would be technically feasible and would enable the WMU to generate electricity from renewable fuels on a dispatchable basis.« less
Landsat Maps in Student Teaching.
ERIC Educational Resources Information Center
Kirman, Joseph M.; Goldberg, Jack
1978-01-01
Describes the use of Landsat maps in a study to determine the feasibility of supervising student teachers with group telephone conferencing. Project value was determined by cooperating teacher evaluations, student-teacher comments, and pupil achievement. (MA)
Loudoun County road orders : 1757-1783.
DOT National Transportation Integrated Search
2013-05-01
The road history projects undertaken by the Virginia Center for Transportation Innovation and Research (formerly the : Virginia Transportation Research Council) establish the feasibility of studies of early road networks and their use in the : enviro...
Loudoun County road orders : 1783-1800.
DOT National Transportation Integrated Search
2015-04-01
The road history projects undertaken by the Virginia Center for Transportation Innovation and Research (formerly the : Virginia Transportation Research Council) establish the feasibility of studies of early road networks and their use in the : enviro...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
... 10 to 30 NC Sea Dragon or Red Hawk tidal turbines at a rated capacity of 100 kilowatts, (2) an... Federal Power Act, proposing to study the feasibility of the Cohansey River Energy Project, which would be.... The project is estimated to have an annual minimum generation of 3,504,000 kilowatt-hours with the...
ERIC Educational Resources Information Center
Tennessee Univ., Knoxville. Center for Literacy Studies.
The Arizona Adult Literacy and Technology Resource Center and the University of Tennessee's Center for Literacy Studies undertook a collaborative project to explore the feasibility and effectiveness of regional sharing of resources and expertise in field of adult education and literacy education. The project's goals were as follows: involve a…
ERIC Educational Resources Information Center
Jaeger, Martin; Adair, Desmond
2015-01-01
The purpose of this study is to analyse the feasibility of an evidential reasoning (ER) method for portfolio assessments and comparison of the results found with those based on a traditional holistic judgement. An ER approach has been incorporated into portfolio assessment of an undergraduate engineering design course delivered as a project-based…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
... to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the East Foreland Tidal Energy Project (East Foreland project) to be located in Cook Inlet in the vicinity of... from the module site to a shore station on the west coast of the Kenai Peninsula; (3) an approximately...
STTR Phase 1 Final Technical Report for Project Entitled "Developing a Mobile Torrefaction Machine"
DOE Office of Scientific and Technical Information (OSTI.GOV)
James, Joseph J.
The goal of this project, sponsored by Agri-Tech Producers, LLC (ATP), the small business grantee, was to determine if the torrefaction technology, developed by North Carolina State University (NCSU), which ATP has licensed, could be feasibly deployed in a mobile unit. The study adds to the area investigated, by having ATP’s STTR Phase I team give thoughtful consideration to how to use NCSU’s technology in a mobile unit. The findings by ATP’s team were that NCSU’s technology would best perform in units 30’ by 80’ (See Spec Sheet for the Torre-Tech 5.0 Unit in the Appendix) and the technical effectivenessmore » and economic feasibility investigation suggested that such units were not easily, efficiently or safely utilized in a forest or farm setting. (Note rendering of possible mobile system in the Appendix) Therefore, the findings by ATP’s team were that NCSU’s technology could not feasibly be deployed as a mobile unit.« less
Ghana refinery expansion and modernization project. Export trade information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-11-01
The U.S. Trade and Development Program (TDP) is considering the provision of funds to the Ghanaian Ministry of Fuel and Power (MFP) to conduct a study of the scope and feasibility of expanding and modernizing its Tema Refinery to meet future demands for gasoline and to minimize heavy fuel oil production. All of the needed licensed process technology and process know-how could be provided by U.S. sources and this, coupled with U.S. equipment and catalyst supply, meets the TDP criteria for funding the feasibility study. Europe aggressively offers alternate licensable technology for some of the processes. U.S. manufacturers of specialtymore » equipment are marginally competitive in the international market, where competition is fierce. The Definitional Mission recommends that full feasibility study be undertaken.« less
Reza-Paul, Sushena; Lazarus, Lisa; Doshi, Monika; Hafeez Ur Rahman, Syed; Ramaiah, Manjula; Maiya, Raviprakash; Ms, Venugopal; Venukumar, K T; Sundararaman, Sundar; Becker, Marissa; Moses, Stephen; Lorway, Robert
2016-01-01
HIV prevalence among female sex workers (FSWs) in India remains well above the national average. Pre-exposure prophylaxis (PrEP), a new HIV prevention technology, may help to reduce HIV incidence, but there is a dearth of research that can inform the potential scale-up of PrEP in India. In partnership with Ashodaya Samithi, a local sex worker collective, we conducted a feasibility study to assess acceptance of a planned PrEP demonstration project, willingness to use PrEP, and recommendations for project roll-out among FSWs in southern Karnataka. From January-April 2015, 6 focus group discussions, 47 in-depth interviews, and 427 interviewer-administered questionnaires were completed by female sex workers. All participants were 18 years of age or older and practiced sex work. Qualitative data were coded for key themes and emergent categories. Univariate descriptive analysis was employed to summarise the quantitative data. Qualitative. PrEP was described as an exciting new prevention technology that places control in the hands of FSWs and provides a "double safety" in combination with condom use. Participants expressed agreement that women who may experience more HIV risk in their occupational environments should be prioritized for enrollment into a demonstration project. Quantitative. 406 participants (95%) expressed interest in PrEP. Participants prioritized the inclusion of FSWs under the age of 25 (79%), those who do not use condoms when clients offer more money (58%), who do not consistently use condoms with regular partners (57%), who drink alcohol regularly (49%), and who do not use condoms consistently with clients (48%). This feasibility study indicated strong interest in PrEP and a desire to move forward with the demonstration project. Participants expressed their responses in terms of public health discourses surrounding risk, pointing to the importance of situating PrEP scale up within the trusted spaces of community-based organizations as a means of supporting PrEP uptake and adherence.
A feasibility study for conducting unattended night-time operations at WMKO
NASA Astrophysics Data System (ADS)
Stomski, Paul J.; Gajadhar, Sarah; Dahm, Scott; Jordan, Carolyn; Nordin, Tom
2016-08-01
In 2015, W. M. Keck Observatory conducted a study of the feasibility of conducting nighttime operations on Maunakea without any staff on the mountain. The study was motivated by the possibility of long term operational costs savings as well as other expected benefits. The goals of the study were to understand the technical feasibility and risk as well as to provide labor and cost estimates for implementation. The results of the study would be used to inform a decision about whether or not to fund and initiate a formal project aimed at the development of this new unattended nighttime operating capability. In this paper we will describe the study process as well as a brief summary of the results including the identified viable design alternative, the risk analysis, and the scope of work. We will also share the decisions made as a result of the study and current status of related follow-on activity.
Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall; Wallach Kildemoes, Helle; Nørgaard, Lotte Stig; Jakupi, Arianit; Raka, Denis; Gürpinar, Emre Umut; Alkan, Ali; Hoxha, Iris; Malaj, Admir; Cantarero, Lourdes Arevalo
2016-01-01
In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge regarding how to conduct these types of research projects by evaluating a pilot study of the project. Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused on 'local ownership', 'research quality' and 'feasibility' with regard to successful implementation and evaluation. The evaluation was achieved by interpreting 'Skype' and 'face to face' meetings and email correspondence by applying 'critical common sense'. Local data collectors achieved a sense of joint ownership. Overall, the protocol worked well. Several minor challenges pertaining to research quality and feasibility were identified, in particular obtaining narratives when conducting interviews and recruiting patients for the study. Furthermore, local data collectors found it difficult to allocate sufficient time to the project. Solutions were discussed and added to the protocol. Despite the challenges, it was possible to achieve an acceptable scientific level of research when conducting qualitative multi-country research collaboration under the given circumstances. Specific recommendations to achieve this are provided by the authors.
Landfill Gas Energy Project Development Handbook
View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.
Feasibility study of algae-based CO2 capture
Abstract: The biomass of microalgae contains approximately 50% carbon, which is commonly obtained from the atmosphere, but can also be taken from commercial sources that produce CO2, such as coal-fired power plants. A study of operational demonstration projects is being underta...
Feasibility study of algae-based Carbon Dioxide capture
SUMMARY: The biomass of microalgae contains approximately 50% carbon, which is commonly obtained from the atmosphere, but can also be taken from commercial sources that produce CO2, such as coal-fired power plants. A study of operational demonstration projects is being undertak...
Field study of a shredded-tire embankment in Virginia.
DOT National Transportation Integrated Search
2004-01-01
In response to increased environmental concerns, the Virginia Department of Transportation, with the support of the Virginia Department of Environmental Quality, developed an experimental project designed to test the feasibility of using shredded tir...
Corridor Planning And Feasibility Analysis, Early Action Projects Appendix
DOT National Transportation Integrated Search
1994-05-01
STUDY OBJECTIVE. BECAUSE OF THE PHYSICAL, ENVIRONMENTAL, AND TRAVEL CHARACTERISTICS OF I-70 FROM DENVER TO GLENWOOD SPRINGS, THE COLORADO DEPARTMENT OF TRANSPORTATION (CDOT) IDENTIFIED IT AS A PRIME CORRIDOR FOR IMPLEMENTING INTELLIGENT TRANSPORTATIO...
Systems Analysis and Design for Decision Support Systems on Economic Feasibility of Projects
NASA Astrophysics Data System (ADS)
Balaji, S. Arun
2010-11-01
This paper discuss about need for development of the Decision Support System (DSS) software for economic feasibility of projects in Rwanda, Africa. The various economic theories needed and the corresponding formulae to compute payback period, internal rate of return and benefit cost ratio of projects are clearly given in this paper. This paper is also deals with the systems flow chart to fabricate the system in any higher level computing language. The various input requirements from the projects and the output needed for the decision makers are also included in this paper. The data dictionary used for input and output data structure is also explained.
1995-05-01
K Task 10c - Water Quality and Hydrology Assessment APPENDIX L Task 10d - Archaeological/Historic Assessment APPENDIX M Task l~e - Ecological ...options to select a proposed project. The first phase included feasibility level design, cost estimating, water quality, ecological , archaeological and...Assessment 47 Ecological Assessment 49 Historic/Archaeological Assessment 53 Socio/Economic Assessment 54 Proposed Project 57 Chapter 7. PRELIMINARY
Landfill Gas Energy Project Development Handbook Files
View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.
U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends
NASA Astrophysics Data System (ADS)
Carter, N. T.
2015-12-01
The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.
Locked on course: Hydro-Quebec`s commitment to mega-projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro
1997-01-01
Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier successmore » with large projects, (2) its engineering culture`s norms for consistency, and (3) its role in the government`s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects.« less
1980-10-01
May 1980 Dollars) 93 32 Apportionment of Total Project Cost for Alternative 1, Option 1 (1,000-Footer) 94 33 Estimated Investment Cost and Annual...Costs - Alternative 2, Option 1 (1,000-Foot Vessels) (May 1980 Dollars) 101 36 Apportionment of Total Project Cost for Alternative 2, Option 1 (1,000...1 (1,000-Footer) 104 39 Estimate of Navigation Project Codes - Alternative 3, Option 1 (1,000-Foot Vessels) (May 1980 Dollars) 107 40 Apportionment of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuznetsov, Yury N.
The co-generation nuclear power plant (CNPP) producing electricity and district heating heat is planned to be constructed in Archangelsk Region of Russia. Following the 'Letter of Intent' signed by Governor of Archangelsk region and by Minister of the Russian Federation for atomic energy the feasibility study of the Project has been done. The NPP will be based on the four co-generation nuclear power units with the Russian VK-300 SBWR. The innovative passive VK-300 reactor facility has been designed on the basis of well-established nuclear technologies, proven major components, the operating experience of the prototype VK-50 reactor in RIAR, Dimitrovgrad, andmore » the experience in designing such reactors as SBWR (GE) and SWR-1000 (Siemens). The CNPP's total power is planned to be 1000 MW(e) and district-heating heat production capacity 1600 Gcal/h. A detailed description of the results of the feasibility study is presented in the report. The results of the feasibility study have shown that the Archangelsk CGNP is feasible in terms of engineering, economics and production. (authors)« less
Feasibility study of utilizing ultraportable projectors for endoscopic video display (with videos).
Tang, Shou-Jiang; Fehring, Amanda; Mclemore, Mac; Griswold, Michael; Wang, Wanmei; Paine, Elizabeth R; Wu, Ruonan; To, Filip
2014-10-01
Modern endoscopy requires video display. Recent miniaturized, ultraportable projectors are affordable, durable, and offer quality image display. Explore feasibility of using ultraportable projectors in endoscopy. Prospective bench-top comparison; clinical feasibility study. Masked comparison study of images displayed via 2 Samsung ultraportable light-emitting diode projectors (pocket-sized SP-HO3; pico projector SP-P410M) and 1 Microvision Showwx-II Laser pico projector. BENCH-TOP FEASIBILITY STUDY: Prerecorded endoscopic video was streamed via computer. CLINICAL COMPARISON STUDY: Live high-definition endoscopy video was simultaneously displayed through each processor onto a standard liquid crystal display monitor and projected onto a portable, pull-down projection screen. Endoscopists, endoscopy nurses, and technicians rated video images; ratings were analyzed by linear mixed-effects regression models with random intercepts. All projectors were easy to set up, adjust, focus, and operate, with no real-time lapse for any. Bench-top study outcomes: Samsung pico preferred to Laser pico, overall rating 1.5 units higher (95% confidence interval [CI] = 0.7-2.4), P < .001; Samsung pocket preferred to Laser pico, 3.3 units higher (95% CI = 2.4-4.1), P < .001; Samsung pocket preferred to Samsung pico, 1.7 units higher (95% CI = 0.9-2.5), P < .001. The clinical comparison study confirmed the Samsung pocket projector as best, with a higher overall rating of 2.3 units (95% CI = 1.6-3.0), P < .001, than Samsung pico. Low brightness currently limits pico projector use in clinical endoscopy. The pocket projector, with higher brightness levels (170 lumens), is clinically useful. Continued improvements to ultraportable projectors will supply a needed niche in endoscopy through portability, reduced cost, and equal or better image quality. © The Author(s) 2013.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
...(f) of the Federal Power Act, proposing to study the feasibility of the Salem Tidal Energy Project... Atlantic Port Terminal to the south. The project proposes between 10 and 30 NC Sea Dragon or Red Hawk tidal... minimum of 3,504,000 kW hours per year with the installation of 10 units. Applicant Contact: Mr. Roger...
ERIC Educational Resources Information Center
1969
This document reports an initial conference of ten small developing colleges which are contracted to study the feasibility of instituting all or parts of the nine teacher education program models developed in the Teacher Education Project of the U.S. Office of Education (USOE). Included in the report are summaries of prepared statements by each…
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are proposed projects under the Rural Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steen, M.; Lisell, L.; Mosey, G.
The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installationmore » and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.« less
Feasibility study of algae-based CO2 capture
The biomass of microalgae contains approximately 50% carbon, which is commonly obtained from the atmosphere, but can also be taken from commercial sources that produce CO2, such as coal-fired power plants. A study of operational demonstration projects is being undertaken to eval...
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
Birtwhistle, Richard; Keshavjee, Karim; Lambert-Lanning, Anita; Godwin, Marshall; Greiver, Michelle; Manca, Donna; Lagacé, Claudia
2009-01-01
The development of a pan-Canadian network of primary care research networks for studying issues in primary care has been the vision of Canadian primary care researchers for many years. With the opportunity for funding from the Public Health Agency of Canada and the support of the College of Family Physicians of Canada, we have planned and developed a project to assess the feasibility of a network of networks of family medicine practices that exclusively use electronic medical records. The Canadian Primary Care Sentinel Surveillance Network will collect longitudinal data from practices across Canada to assess the primary care epidemiology and management of 5 chronic diseases: hypertension, diabetes, depression, chronic obstructive lung disease, and osteoarthritis. This article reports on the 7-month first phase of the feasibility project of 7 regional networks in Canada to develop a business plan, including governance, mission, and vision; develop memorandum of agreements with the regional networks and their respective universities; develop and obtain approval of research ethics board applications; develop methods for data extraction, a Canadian Primary Care Sentinel Surveillance Network database, and initial assessment of the types of data that can be extracted; and recruitment of 10 practices at each network that use electronic medical records. The project will continue in phase 2 of the feasibility testing until April 2010.
Port of Davisville utilization study : phase II.
DOT National Transportation Integrated Search
2011-02-01
This project investigated the feasibility of expanding the Port of Davisville (Quonset Point, RI) to serve : as a port of entry and departure for international container shipments. As an international port of entry : (departure), the Port of Davisvil...
Code of Federal Regulations, 2011 CFR
2011-01-01
... established design, and installation procedures and practices. Professional service providers, trades, large... term without grant assistance. Design/build method. A method of project development whereby all design..., or encumbrances. Feasibility study. An analysis of the economic, market, technical, financial, and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... established design, and installation procedures and practices. Professional service providers, trades, large... term without grant assistance. Design/build method. A method of project development whereby all design..., or encumbrances. Feasibility study. An analysis of the economic, market, technical, financial, and...
NASA Technical Reports Server (NTRS)
Olsen, C. D.
1972-01-01
Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.
The Worksite Heart Health Improvement Project (WHHIP): feasibility and efficacy.
Flannery, Kelly; Resnick, Barbara; Galik, Elizabeth; Lipscomb, Jane; McPhaul, Kathleen; Shaughnessy, Marianne
2012-01-01
Test the feasibility and efficacy of the Worksite Heart Health Improvement Project (WHHIP). The WHHIP was a quasi-experimental 6-month pilot performed in 2 long-term care facilities. Thirty-nine female minority nursing assistants participated in this study with a mean age of 42.39 (SD = 12.79) years. Measures were collected at baseline, 3, and 6 months and included blood pressure, lipid panel, body mass index, physical activity levels, diet behaviors, depressive symptoms, and self-efficacy outcomes. The 3-month WHHIP intervention included 3 components: environmental and policy assessment; education; and on-going motivation. The control site received education only. Subject participation averaged 47% and 58% in exercise and diet related activities, respectively. Generalized estimating equations showed the treatment group showed significant improvements in depressive symptoms (p = .012), systolic blood pressure (p = .028), total cholesterol (p = .002) and triglycerides (p = .011) over time. The treatment group also showed trends for improvement in diet behaviors (p = .069) and diastolic blood pressure (p = .073). This study provided feasibility evidence for the WHHIP and preliminary evidence that the WHHIP can improve heart healthy behaviors and subsequent outcomes among nursing assistants in long-term care settings. © 2012 Wiley Periodicals, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cook, W.J.; Brown, W.R.; Siwajek, L.
1998-09-01
The project is a landfill gas to energy project rated at about 4 megawatts (electric) at startup, increasing to 8 megawatts over time. The project site is Boului Landfill, near Bucharest, Romania. The project improves regional air quality, reduces emission of greenhouse gases, controls and utilizes landfill methane, and supplies electric power to the local grid. The technical and economic feasibility of pre-treating Boului landfill gas with Acrion`s new landfill gas cleanup technology prior to combustion for power production us attractive. Acrion`s gas treatment provides several benefits to the currently structured electric generation project: (1) increase energy density of landfillmore » gas from about 500 Btu/ft{sup 3} to about 750 Btu/ft{sup 3}; (2) remove contaminants from landfill gas to prolong engine life and reduce maintenance;; (3) recover carbon dioxide from landfill gas for Romanian markets; and (4) reduce emission of greenhouse gases methane and carbon dioxide. Greenhouse gas emissions reduction attributable to successful implementation of the landfill gas to electric project, with commercial liquid CO{sub 2} recovery, is estimated to be 53 million metric tons of CO{sub 2} equivalent of its 15 year life.« less
A feasibility study: Forest Fire Advanced System Technology (FFAST)
NASA Technical Reports Server (NTRS)
Mcleod, R. G.; Martin, T. Z.; Warren, J.
1983-01-01
The National Aeronautics and Space Administration/Jet Propulsion Laboratory and the United States Department of Agriculture Forest Service completed a feasibility study that examined the potential uses of advanced technology in forest fires mapping and detection. The current and future (1990's) information needs in forest fire management were determined through interviews. Analysis shows that integrated information gathering and processing is needed. The emerging technologies that were surveyed and identified as possible candidates for use in an end to end system include ""push broom'' sensor arrays, automatic georeferencing, satellite communication links, near real or real time image processing, and data integration. Matching the user requirements and the technologies yielded a ""strawman'' system configuration. The feasibility study recommends and outlines the implementation of the next phase for this project, a two year, conceptual design phase to define a system that warrants continued development.
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
ERIC Educational Resources Information Center
IntelliSys, Inc., Syracuse, NY.
This was Phase I of a three-phased project. This phase of the project investigated the feasibility of a computer-based instruction (CBI) workstation, designed for use by teachers of handicapped students within a school structure. This station is to have as a major feature the ability to produce in-house full-motion video using one of the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabucchi, Chiara
The CarbonSAFE Illinois – East Sub-Basin project is conducting a pre-feasibility assessment for commercial-scale CO2 geological storage complexes. The project aims to identify sites capable of storing more than 50 million tons of industrially-sourced CO2. To support the business development assessment of the economic viability of potential sites in the East Sub-Basin and explore conditions under which a carbon capture and storage (CCS) project therein might be revenue positive, this document provides a summary of carbon storage incentives and legislation of potential relevance to the project.
Elsey, Helen; Farragher, Tracey; Tubeuf, Sandy; Bragg, Rachel; Elings, Marjolein; Brennan, Cathy; Gold, Rochelle; Shickle, Darren; Wickramasekera, Nyantara; Richardson, Zoe; Cade, Janet; Murray, Jenni
2018-01-01
Objectives To assess the feasibility of conducting a cost-effectiveness study of using care farms (CFs) to improve quality of life and reduce reoffending among offenders undertaking community orders (COs). To pilot questionnaires to assess quality of life, connection to nature, lifestyle behaviours, health and social-care use. To assess recruitment and retention at 6 months and feasibility of data linkage to Police National Computer (PNC) reconvictions data and data held by probation services. Design Pilot study using questionnaires to assess quality of life, individually linked to police and probation data. Setting The pilot study was conducted in three probation service regions in England. Each site included a CF and at least one comparator CO project. CFs are working farms used with a range of clients, including offenders, for therapeutic purposes. The three CFs included one aquaponics and horticulture social enterprise, a religious charity focusing on horticulture and a family-run cattle farm. Comparator projects included sorting secondhand clothes and activities to address alcohol misuse and anger management. Participants We recruited 134 adults (over 18) serving COs in England, 29% female. Results 52% of participants completed follow-up questionnaires. Privatisation of UK probation trusts in 2014 negatively impacted on recruitment and retention. Linkage to PNC data was a more successful means of follow-up, with 90% consenting to access their probation and PNC data. Collection of health and social-care costs and quality-adjusted life year derivation were feasible. Propensity score adjustment provided a viable comparison method despite differences between comparators. We found worse health and higher reoffending risk among CF participants due to allocation of challenging offenders to CFs, making risk of reoffending a confounder. Conclusions Recruitment would be feasible in a more stable probation environment. Follow-up was challenging; however, assessing reconvictions from PNC data is feasible and a potential primary outcome for future studies. PMID:29550778
DOE Office of Scientific and Technical Information (OSTI.GOV)
RICH, LAUREN
2013-09-30
A two year wind resource assessment was conducted to determine the feasibility of developing a community scale wind generation system for the Upper Skagit Indian Tribe's Bow Hill land base, and the project researched residential wind resource technologies to determine the feasibility of contributing renewable wind resource to the mix of energy options for our single and multi-family residential units.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rawool-Sullivan, Mohini; Bounds, John Alan; Brumby, Steven P.
2012-04-30
This is the final report of the project titled, 'Isotope Identification Algorithm for Rapid and Accurate Determination of Radioisotopes,' PMIS project number LA10-HUMANID-PD03. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). It summarizes work performed over the FY10 time period. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). Human analysts begin analyzing a spectrum based on features in the spectrum - lines and shapes that aremore » present in a given spectrum. The proposed work was to carry out a feasibility study that will pick out all gamma ray peaks and other features such as Compton edges, bremsstrahlung, presence/absence of shielding and presence of neutrons and escape peaks. Ultimately success of this feasibility study will allow us to collectively explain identified features and form a realistic scenario that produced a given spectrum in the future. We wanted to develop and demonstrate machine learning algorithms that will qualitatively enhance the automated identification capabilities of portable radiological sensors that are currently being used in the field.« less
Active Treatment for Idiopathic Adolescent Scoliosis (ACTIvATeS): a feasibility study.
Williams, Mark A; Heine, Peter J; Williamson, Esther M; Toye, Francine; Dritsaki, Melina; Petrou, Stavros; Crossman, Richard; Lall, Ranjit; Barker, Karen L; Fairbank, Jeremy; Harding, Ian; Gardner, Adrian; Slowther, Anne-Marie; Coulson, Neil; Lamb, Sarah E
2015-07-01
The feasibility of conducting a definitive randomised controlled trial (RCT) evaluating the clinical effectiveness and cost-effectiveness of scoliosis-specific exercises (SSEs) for adolescent idiopathic scoliosis (AIS) is uncertain. The aim of this study was to assess the feasibility of conducting a large, multicentre trial of SSE treatment for patients with AIS, in comparison with standard care, and to refine elements of the study design. The objectives were to (1) update a systematic review of controlled trials evaluating the efficacy of SSE in AIS; (2) survey UK orthopaedic surgeons and physiotherapists to determine current practice, patient populations and equipoise; (3) randomise 50 adolescents to a feasibility trial of either usual care or SSE interventions across a range of sites; (4) develop, document and assess acceptability and adherence of interventions; (5) assess and describe training requirements of physiotherapists; and (6) gain user input in all relevant stages of treatment and protocol design. Multicomponent feasibility study including UK clinician survey, systematic literature review and a randomised feasibility trial. The randomised feasibility study involved four secondary care NHS trusts providing specialist care for patients with AIS. The randomised feasibility study recruited people aged 10-16 years with mild AIS (Cobb angle of < 50°). The randomised study allocated participants to standard practice of advice and education or a physiotherapy SSE programme supported by a home exercise plan. Our choice of intervention was informed by a systematic review of exercise interventions for AIS. The main outcome was feasibility of recruitment to the randomised study. Other elements were to inform choice of outcomes for a definitive trial and included curve severity, quality of life, requirement for surgery/brace, adverse events, psychological symptoms, costs and health utilities. A UK survey of orthopaedic consultants and physiotherapists indicated a wide variation in current provision of exercise therapy through physiotherapy services. It also found that clinicians from at least 15 centres would be willing to have their patients involved in a full study. A systematic review update found five new studies that were generally of low quality but showed some promise of effectiveness of SSE. The randomised study recruited 58 patients from four NHS trusts over 11 months and exceeded the pre-specified target recruitment rate of 1.4 participants per centre per month, with acceptable 6-month follow-up (currently 73%). Adherence to treatment was variable (56% of participants completed treatment offered). The qualitative study found the exercise programme to be highly acceptable. We learnt important lessons from patient and public involvement during the study in terms of study and intervention presentation, as well as practical elements such as scheduling of intervention sessions. A definitive RCT evaluating clinical effectiveness and cost-effectiveness of SSE for idiopathic scoliosis is warranted and feasible. Such a RCT is a priority for future work in the area. There is a sufficiently large patient base, combined with willingness to be randomised within specialist UK centres. Interventions developed during the feasibility study were acceptable to patients, families and physiotherapists and can be given within the affordability envelope of current levels of physiotherapy commissioning. Current Controlled Trials ISRCTN90480705. This project was funded by the NIHR Health Technology Assessment programme and will be published in full in Health Technology Assessment; Vol. 19, No. 55. See the NIHR Journals Library website for further project information.
QIPS: quantum information and quantum physics in space
NASA Astrophysics Data System (ADS)
Schmitt-Manderbach, Tobias; Scheidl, Thomas; Ursin, Rupert; Tiefenbacher, Felix; Weier, Henning; Fürst, Martin; Jennewein, T.; Perdigues, J.; Sodnik, Z.; Rarity, J.; Zeilinger, Anton; Weinfurter, Harald
2017-11-01
The aim of the QIPS project (financed by ESA) is to explore quantum phenomena and to demonstrate quantum communication over long distances. Based on the current state-of-the-art a first study investigating the feasibility of space based quantum communication has to establish goals for mid-term and long-term missions, but also has to test the feasibility of key issues in a long distance ground-to-ground experiment. We have therefore designed a proof-of-concept demonstration for establishing single photon links over a distance of 144 km between the Canary Islands of La Palma and Tenerife to evaluate main limitations for future space experiments. Here we report on the progress of this project and present first measurements of crucial parameters of the optical free space link.
A Regional Approach to Rail Transit Training for the New York Metropolitan Area
DOT National Transportation Integrated Search
1991-06-01
The purpose of this project was to study the feasibility of a regional approach : to rail transit training in the New York metropolitan area and to recommend a : means for implementing such a cooperative training effort. The study had two : parts. Th...
Practice and professional development plans (PPDPs): results of a feasibility study
Elwyn, Glyn; Carlisle, Sandra; Hocking, Paul; Smail, Simon
2001-01-01
Background Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Aims Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Design Qualitative observational study. Study sample All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Method Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Results Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. Conclusions This work supports the view that organisational development has considerable potential for bringing about effective change, and individual contributions could form a valuable component of personal portfolios. We believe that the existing structures in education and management in the health service are not yet able to support these processes. Evidence from the fields of risk management and quality improvement all point to the need to develop effective organisational systems and the results of this feasibility study indicate that alternative models of sustaining organisational development need careful evaluation. PMID:11299046
NASA Astrophysics Data System (ADS)
Saputra, Y. A.; Setyaningtyas, V. E. D.; Latiffianti, E.; Wijaya, S. H.; Ladamay, O. S. A.
2018-04-01
Measuring project success level is a challenging activity. This area of works has attracted many researchers to look deeper into the method of measurement, success factor identification, risk management, and many others relevant topics. However, the project management scope is limited until the project handover stage. After a project handover, the control of a project management changes from Project Management Team to the project owner/commercialization team. From an investor’s point of view, the success of a project delivery needs to be followed by the success of commercialization phase. This paper aims to present an approach on how we track and measure the progress and success level of a project investment in the commercialization phase. This is an interesting topic which probably often being forgotten in many practical case. Our proposed concept modify Freeman and Beale concept by estimating the variance between the Planned Net Present Value / Annual Worth (as it is in the Feasibility Study Document) and the Actual Net Present Value / Annual Worth (until the point time of evaluation). The gap will lead us to the next analysis and give us some important information, especially exposing whether our project investment performs better than the planning or underperformed. Some corrective actions can be suggested based on the provided information. Practical cases to exercise the concept is also provided and discussed; one case in a property sector in the middle of commercialization phase, and another case in a Power Plant investment approaching the end of commercialization phase.
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...
24 CFR 92.301 - Project-specific assistance to community housing development organizations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...
Reduction of minimum required weight of cementitious materials in WisDOT concrete mixes.
DOT National Transportation Integrated Search
2011-12-01
"This project was designed to explore the feasibility of lowering the cementitious materials content : (CMC) used in Wisconsin concrete pavement construction. The cementitious materials studied included : portland cement, fly ash, and ground granulat...
Reduction of minimum required weight of cementitious materials in WisDOT concrete mixes.
DOT National Transportation Integrated Search
2011-12-01
This project was designed to explore the feasibility of lowering the cementitious materials content : (CMC) used in Wisconsin concrete pavement construction. The cementitious materials studied included : portland cement, fly ash, and ground granulate...
Code of Federal Regulations, 2012 CFR
2012-07-01
... inspections), support agency, remedial investigation/feasibility studies, remedial design, remedial action.../E) services. Consultation, investigations, reports, or services for design-type projects within the... the course of a response. It is designed to provide for two-way communication between the affected...
Code of Federal Regulations, 2013 CFR
2013-07-01
... inspections), support agency, remedial investigation/feasibility studies, remedial design, remedial action.../E) services. Consultation, investigations, reports, or services for design-type projects within the... the course of a response. It is designed to provide for two-way communication between the affected...
42 CFR 136.101 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...
Sedimentary Geothermal Feasibility Study: October 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Augustine, Chad; Zerpa, Luis
The objective of this project is to analyze the feasibility of commercial geothermal projects using numerical reservoir simulation, considering a sedimentary reservoir with low permeability that requires productivity enhancement. A commercial thermal reservoir simulator (STARS, from Computer Modeling Group, CMG) is used in this work for numerical modeling. In the first stage of this project (FY14), a hypothetical numerical reservoir model was developed, and validated against an analytical solution. The following model parameters were considered to obtain an acceptable match between the numerical and analytical solutions: grid block size, time step and reservoir areal dimensions; the latter related to boundarymore » effects on the numerical solution. Systematic model runs showed that insufficient grid sizing generates numerical dispersion that causes the numerical model to underestimate the thermal breakthrough time compared to the analytic model. As grid sizing is decreased, the model results converge on a solution. Likewise, insufficient reservoir model area introduces boundary effects in the numerical solution that cause the model results to differ from the analytical solution.« less
Pueblo of Jemez Geothermal Feasibility Study Fianl Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
S.A. Kelley; N. Rogers; S. Sandberg
2005-03-31
This project assessed the feasibility of developing geothermal energy on the Pueblo of Jemez, with particular attention to the Red Rocks area. Geologic mapping of the Red Rocks area was done at a scale of 1:6000 and geophysical surveys identified a potential drilling target at a depth of 420 feet. The most feasible business identified to use geothermal energy on the reservation was a greenhouse growing culinary and medicinal herbs. Space heating and a spa were identified as two other likely uses of geothermal energy at Jemez Pueblo. Further geophysical surveys are needed to identify the depth to the Maderamore » Limestone, the most likely host for a major geothermal reservoir.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study under this program? 404.54 Section 404.54 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...
ERIC Educational Resources Information Center
Henderson, John; And Others
In 1974, the Ontario Educational Communications Authority (OECA) undertook a study to measure the feasibility of loaning video tape recording equipment and video tapes to home users. A pilot program in one branch library found that, with the assistance of a video instruction package and an instructional booklet, users quickly mastered the…
Should body image programs be inclusive? A focus group study of college students.
Ciao, Anna C; Ohls, Olivia C; Pringle, Kevin D
2018-01-01
Most evidence-based body image programs for college students (e.g., the Body Project) are designed for female-only audiences, although body dissatisfaction is not limited to female-identified individuals. Furthermore, programs do not explicitly discuss diversity, although individuals with marginalized gender, racial, and sexual identities may be particularly vulnerable to body image disturbances. Making programs more inclusive may increase their disseminability. This qualitative study examined the feasibility of adapting the Body Project for universal and inclusive use with college students. Participants (N = 36; M age = 21.66 years; 73% female-identified; 20% sexual minority; 23% racial minority) attended one of five semi-structured focus groups to explore the inclusivity of appearance-based cultural norms using adapted Body Project activities and discuss the feasibility of universal and inclusive interventions. Inductive qualitative content analysis with three-rater consensus identified focus group themes. There was consensus that inclusive interventions could have a positive impact (broadening perspectives, normalizing body image concerns, increasing awareness) despite potential barriers (poor diversity representation, vulnerability). There was strong consensus regarding advice for facilitating inclusive interventions (e.g., skilled facilitation, education, increasing diversity). Results suggest that inclusive body image programs are desirable and provide a framework for creating the EVERYbody Project, a program for more universal audiences. © 2017 Wiley Periodicals, Inc.
Bussing, Regina; Koro-Ljungberg, Mirka; Gagnon, Joseph Calvin; Mason, Dana M.; Ellison, Anne; Noguchi, Kenji; Garvan, Cynthia W.; Albarracin, Dolores
2016-01-01
Objective Little is known about perceptions surrounding academic interventions for ADHD that determine intervention feasibility. Method As part of a longitudinal mixed-methods research project, representative school district samples of 148 adolescents (54.8%), 161 parents (59.4%), 122 teachers (50.0%), 46 health care providers (53.5%), and 92 school health professionals (65.7%) completed a cross-sectional survey. They also answered open-ended questions addressing undesirable intervention effects, which were analyzed using grounded theory methods. Results Adolescents expressed significantly lower receptivity toward academic interventions than adult respondents. Stigma emerged as a significant threat to ADHD intervention feasibility, as did perceptions that individualized interventions foster inequality. Conclusion Findings suggest that adolescents’ viewpoints must be included in intervention development to enhance feasibility and avoid interventions acceptable to adults, but resisted by adolescents. PMID:24448222
Hawk, Mary
2013-12-01
African American women in the United States experience significant HIV health disparities. The majority of evidence-based risk reduction interventions do not incorporate HIV testing, and most are targeted only to narrow segments of the population such as women who are pregnant or seen in STI clinics. This pilot study assessed the feasibility and efficacy of The Girlfriends Project (TGP), a community developed and community evaluated HIV risk reduction and testing intervention. A group randomized wait-list design was used to recruit 149 women and to compare findings for intervention group versus control group participants. Women in the intervention group demonstrated statistically-significant increases in HIV knowledge scores and in condom use during vaginal sex. Eighty-seven percent of participants accessed HIV testing with a 100% return rate for results. Study findings suggest that TGP has the potential to be an effective intervention and to increase number of African American women who access HIV testing.
Morgan, Vanessa
2014-03-01
The purpose of this project was to examine the feasibility of an ongoing holistic wellness program in a residential facility treating persons with HIV/AIDS. The goal was to create a voluntary, four week holistic wellness intensive within the established inpatient behavioral health treatment program. Participants were given practicable holistic self care tools to effectively manage HIV related symptoms, general medical issues, addiction, depression, stress and anxiety. The program incorporated evidence-based holistic activities including yoga, therapeutic dance, meditation, Reiki, and reflective journaling. Narrative survey results and post-program evaluation support that an ongoing holistic wellness program within the existing treatment model is feasible and could have numerous potential beneficial effects. This project clearly exemplified the ideal opportunity for holistic nurses to implement innovative holistic interventions within the current healthcare delivery system. It is the author's observation that future studies with a larger participant group to further examine measurable benefits can lend valuable information and insight into the future development of holistic wellness programs for residential treatment facilities.
Project: Toward a National Educational Testing Network. Final Report.
ERIC Educational Resources Information Center
Bock, Darrell R.
Three fiscal year 1987 deliverables due for the "Toward a National Educational Testing Network: Feasibility Study of Duplex Design" are presented. The study is concerned with implementation of statewide and interstate testing of student attainment. The report includes: (1) a duplex design (DD) review paper discussing the means by which…
ERIC Educational Resources Information Center
Bolland, Kathleen A.
As part of a project designed to identify appropriate and feasible methods of evaluating vocational education with respect to its outcomes, this bibliography contains descriptive and evaluative annotations of a selection of empirical studies of vocational education outcomes. Following a technical introduction discussing the methodological issues…
DOT National Transportation Integrated Search
1973-01-01
The purpose of the study was to define the current traffic records system of the Commonwealth so as to identify deficiencies as specifically as possible; to suggest changes to upgrade the system to meet current and projected demands at maximum effici...
77 FR 35466 - Pilot Project Grants in Support of Railroad Safety Risk Reduction Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... mobile telephones and laptop computers. This subpart was codified in response to an increase in the... FRA funding. Applications should include feasibility studies and cost estimates, if completed. FRA will more favorably consider applications that include these types of studies and estimates, as they...
1988-01-01
infiltration studies ( Westerdahl and Skogerboe 1982). Exten- sive field verification studies have been conducted with the WES Rainfall Simulator...Lysimeter System on a wide range of USACE project sites ( Westerdahl and Skogerboe 1982, Lee and Skogerboe 1984, Skogerboe et al. 1987). The WES Rainfall...Criteria for Water 1986,"’ Criteria and Standards Division, Washington, DC. Westerdahl , H. E., and Skogerboe, J. G. 1982. "Realistic Rainfall and Water
Advanced reactor site feasibility evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haynes, Mark; Owens, Martin; Southworth, Finis
The report provides a description of the project, summarizes the methodology and results for each task of the project, and ends with the overall project conclusions and recommendations. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.
1984-08-01
Munesota. Flood Control Project (Geotechnical Cmmts). 2. Inclosed m ou resposes to the above-cited c ts. POt IT G0MVOAU: I Incl PC=U A. P13HR S Cdf...I . 4,! year period to house about 4b,O00 people in a self -contained community. Projections noted in the 1973 feasibility report were for a total...incorporation of trails for nature study, hiking, self -propelled bicycle, horseback riding, snowshoe, cross- country ski, and access by fishermen and
Recycling Solid Waste in Chattanooga
ERIC Educational Resources Information Center
Vredeveld, Ruth; Martin, Robin
1973-01-01
Students undertook a group project in collaboration with city officials to study garbage types in the community and possibilities of recycling solid wastes. Data collected from various sources revealed that public attitude was favorable for recycling efforts and that it was feasible economically. (PS)
Experimental Investigation of Acousto-Optic Communications
2003-09-01
acousto - optic sensor shows promise as a means for detecting acoustic data projected towards the water surface from a submerged platform. The laser...simulation studies were conducted to demonstrate acousto - optic sensor feasibility for obtaining robust recordings of acoustic communication signals across
Investigate feasibility of using ground penetrating radar in QC/QA of rubblization projects.
DOT National Transportation Integrated Search
2011-07-01
This study investigated if Ground Penetrating Radar can offer a suitable technology for mapping the physical condition of fractured slab rapidly, particularly under the steel reinforcement, without disturbing the fractured layer. A 4000 long compo...
Feasibility study to increase utilization at the Port of Davisville (Quonset, RI)
DOT National Transportation Integrated Search
2009-08-01
This project investigated the logistics and transportation issues associated with establishing and : increasing the use of shipping containers to import and export goods into the Rhode Island : geographic area using the Port of Davisville. The Port o...
Gateway Arch Circulator Conceptual Feasibility Study : Jefferson National Expansion Memorial
DOT National Transportation Integrated Search
2015-03-01
The Jefferson National Expansion Memorial (JEFF) is undergoing major design changes as part of the City Arch River 2015 project (CAR) that will impact access for park visitors. The park and stakeholders are considering a circulator system to facilita...
75 FR 62386 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-08
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8993-1] Environmental Impacts Statements; Notice of..., USACE, NC, Surf City and North Topsail Beach Project, To Evaluate Coastal Storm Damage Reduction..., Integrated Feasibility Study, Louisiana Coastal Area (LCA) Implementation, Lafourche, Terrebonne, St. Mary...
Wind Fins: Novel Lower-Cost Wind Power System
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. Morris; Dr. Will D. Swearingen
This project evaluated the technical feasibility of converting energy from the wind with a novel “wind fin” approach. This patent-pending technology has three major components: (1) a mast, (2) a vertical, hinged wind structure or fin, and (3) a power takeoff system. The wing structure responds to the wind with an oscillating motion, generating power. The overall project goal was to determine the basic technical feasibility of the wind fin technology. Specific objectives were the following: (1) to determine the wind energy-conversion performance of the wind fin and the degree to which its performance could be enhanced through basic designmore » improvements; (2) to determine how best to design the wind fin system to survive extreme winds; (3) to determine the cost-effectiveness of the best wind fin designs compared to state-of-the-art wind turbines; and (4) to develop conclusions about the overall technical feasibility of the wind fin system. Project work involved extensive computer modeling, wind-tunnel testing with small models, and testing of bench-scale models in a wind tunnel and outdoors in the wind. This project determined that the wind fin approach is technically feasible and likely to be commercially viable. Project results suggest that this new technology has the potential to harvest wind energy at approximately half the system cost of wind turbines in the 10kW range. Overall, the project demonstrated that the wind fin technology has the potential to increase the economic viability of small wind-power generation. In addition, it has the potential to eliminate lethality to birds and bats, overcome public objections to the aesthetics of wind-power machines, and significantly expand wind-power’s contribution to the national energy supply.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report presents a technical and commercial analysis for the development of three nearly identical electricity generating facilities (biomass steam power plants) in the towns of Chachoengsao, Suphan Buri, and Pichit in Thailand. The Main Report is divided into the following sections: (1.0) Executive Study; (2.0) Project Objectives; (3.0) Review of Combustion Technology for Biomass Fueled Steam Generator Units; (4.0) Conceptual Design; (5.0) Plant Descriptions; (6.0) Plant Operations Staffing; (7.0) Project Schedule; (8.0) Project Cost Estimate; (9.0) Financial Analysis; Appendix - Financial Analysis.
NASA Technical Reports Server (NTRS)
Perret, A.
1986-01-01
This report presents the results of technical studies conducted at CNES/PMF/APS between October 1984 and September 1985 on the VESTA project. These preliminary studies were conducted to establish mission feasibility in terms ofthe trajectory and the scientific objectives, and to determine the type of interfaces which will be required with the Soviets and to measure the magnitude of French participation. A joint French-Soviet report recommends that the project enter phase A, and was approved by CNES and INTERCOSMOS in September, 1985. The mission analysis is made for a mid-1991 launch, and a development schedule for an end-1992 launch is suggested. The decision to postpone the mission was made during the course of the study.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scarlata, C.; Mosey, G.
2013-05-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 1 2012-01-01 2012-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 1 2011-01-01 2011-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... feasibility of the Niagara River Community Hydro Project (Niagara Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...
Evaluation of recycled projects for performance : final report.
DOT National Transportation Integrated Search
1995-04-01
Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...
Practice and professional development plans (PPDPs): results of a feasibility study.
Elwyn, G; Carlisle, S; Hocking, P; Smail, S
2001-01-01
Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Qualitative observational study. All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. This work supports the view that organisational development has considerable potential for bringing about effective change, and individual contributions could form a valuable component of personal portfolios. We believe that the existing structures in education and management in the health service are not yet able to support these processes. Evidence from the fields of risk management and quality improvement all point to the need to develop effective organisational systems and the results of this feasibility study indicate that alternative models of sustaining organisational development need careful evaluation.
Reza-Paul, Sushena; Lazarus, Lisa; Doshi, Monika; Hafeez Ur Rahman, Syed; Ramaiah, Manjula; Maiya, Raviprakash; MS, Venugopal; Venukumar, K. T.; Sundararaman, Sundar; Becker, Marissa; Moses, Stephen; Lorway, Robert
2016-01-01
Background HIV prevalence among female sex workers (FSWs) in India remains well above the national average. Pre-exposure prophylaxis (PrEP), a new HIV prevention technology, may help to reduce HIV incidence, but there is a dearth of research that can inform the potential scale-up of PrEP in India. In partnership with Ashodaya Samithi, a local sex worker collective, we conducted a feasibility study to assess acceptance of a planned PrEP demonstration project, willingness to use PrEP, and recommendations for project roll-out among FSWs in southern Karnataka. Methods From January–April 2015, 6 focus group discussions, 47 in-depth interviews, and 427 interviewer-administered questionnaires were completed by female sex workers. All participants were 18 years of age or older and practiced sex work. Qualitative data were coded for key themes and emergent categories. Univariate descriptive analysis was employed to summarise the quantitative data. Results Qualitative. PrEP was described as an exciting new prevention technology that places control in the hands of FSWs and provides a “double safety” in combination with condom use. Participants expressed agreement that women who may experience more HIV risk in their occupational environments should be prioritized for enrollment into a demonstration project. Quantitative. 406 participants (95%) expressed interest in PrEP. Participants prioritized the inclusion of FSWs under the age of 25 (79%), those who do not use condoms when clients offer more money (58%), who do not consistently use condoms with regular partners (57%), who drink alcohol regularly (49%), and who do not use condoms consistently with clients (48%). Discussion This feasibility study indicated strong interest in PrEP and a desire to move forward with the demonstration project. Participants expressed their responses in terms of public health discourses surrounding risk, pointing to the importance of situating PrEP scale up within the trusted spaces of community-based organizations as a means of supporting PrEP uptake and adherence. PMID:27880833
Code of Federal Regulations, 2010 CFR
2010-01-01
... dollar volume associated with the activity; (ii) An analysis of the impact of the proposed activity on... particular, including a copy of the feasibility study, management plan, financial projections, business plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... to study the feasibility of the Half-Moon Cove Tidal Power Project, to be located in Cobscook and... new 30-foot-wide, 15-foot-high filling and emptying gated section; (3) the 850-acre Half-Moon Cove...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview... the total size, cost, and complexity of the proposed rural water supply project in order to reduce the...
CYTOTOXICITY AND MUTAGENESIS METHODS FOR EVALUATING TOXICITY REMOVAL FROM WASTEWATERS
This project was a feasibility study of the effectiveness of a mammalian cell cytotoxicity assay and a mammalian cell mutagenesis assay for monitoring the toxicity and mutagenicity of influent and effluent wastewater at treatment plants. In the cytotoxicity assay, ambient samples...
PDAs and the Library Without a Roof.
ERIC Educational Resources Information Center
Foster, Clifton Dale
1995-01-01
A project demonstrated the feasibility of accessing library information (online public access catalogs, commercial online databases, Internet) from a distance using handheld personal digital assistants (PDAs) equipped with cellular communication capability. The study is described, and other uses of wireless communications in libraries and…
Testing and evaluation of graduated driver license marker : summary report.
DOT National Transportation Integrated Search
2008-01-01
The objective of this project was to assist New Jersey Motor Vehicle Commission in determining the feasibility of a removable visual marker for Graduated Drivers License (GDL) drivers. The NJ Teen Driver Safety Study Commission issued a report to the...
78 FR 9907 - Hydrodynamics, Inc.; Notice Denying Late Intervention
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13531-000] Hydrodynamics, Inc.; Notice Denying Late Intervention On June 24, 2010, Commission staff issued a three-year preliminary permit to Hydrodynamics, Inc. (Hydrodynamics) to study the feasibility of its proposed East...
Schmidt-Weitmann, Sabine; Buser, Jacqueline; Baumann, Doris; Schmidt, Christian; Brettenhofer, Marlene; Tarnutzer, Silvan; Meienberger, Beda; Otto, Ulrich; Brockes, Christiane
2015-09-01
The research and development project "Long Independent Living Assistant (LILA)'; which is financially supported by the Commission for Technology and lnnoyation (KTI}, is based on the results and experiences of many years of the Medical Online Consultation Service at the University Hospital Zurich.The focus is on development and provision of a comprehensive, telemedicine service. Citizens and patients should be provided more safety at home and the family doctor should be supported by the service. Core elements of the project include the telemonitoring of vital signs combined with an individual teleconsultation via telephone, email and video. Technically, the. service is supported by a web-based documentation and communication platform with an integrated patient record. In a one-year planning phase, individual interviews and group discussions were conducted with the participants of the study. The results are continuously incorporated into the concept. The subsequent pilot phase analyzed the developed tetemedical approach and leads to further improvements. The aim of the study is the evaluation of the needs, feasibility and acceptance of telemedicine services from the perspective of the user, taking into account their social environment~
NASA Technical Reports Server (NTRS)
Mulhall, B. D. L.
1980-01-01
The results of this effort are presented in a manner for use by both the AIDS 3 Operational and Economic Feasibility subtasks as well as the Development of Alternative subtask. The approach taken was to identify the major functions that appear in AIDS 3 and then to determine which technologies would be needed for support. The technologies were then examined from the point of view of reliability, throughput, security, availability, cost and possible future trends. Whenever possible graphs are given to indicate projected costs of rapidly changing technologies.
24 CFR 27.20 - Conditions of foreclosure sale.
Code of Federal Regulations, 2011 CFR
2011-04-01
... probable causes of project failure resulting in its default; (2) A financial analysis of the project... analysis of the project, including the condition of the structure and grounds, the need for rehabilitation... financial feasibility of the project after foreclosure and sale subject to the terms to be required by the...
The European initiative for quality management in lung cancer care.
Blum, Torsten G; Rich, Anna; Baldwin, David; Beckett, Paul; De Ruysscher, Dirk; Faivre-Finn, Corinne; Gaga, Mina; Gamarra, Fernando; Grigoriu, Bogdan; Hansen, Niels C G; Hubbard, Richard; Huber, Rudolf Maria; Jakobsen, Erik; Jovanovic, Dragana; Konsoulova, Assia; Kollmeier, Jens; Massard, Gilbert; McPhelim, John; Meert, Anne-Pascale; Milroy, Robert; Paesmans, Marianne; Peake, Mick; Putora, Paul-Martin; Scherpereel, Arnaud; Schönfeld, Nicolas; Sitter, Helmut; Skaug, Knut; Spiro, Stephen; Strand, Trond-Eirik; Taright, Samya; Thomas, Michael; van Schil, Paul E; Vansteenkiste, Johan F; Wiewrodt, Rainer; Sculier, Jean-Paul
2014-05-01
Lung cancer is the commonest cause of cancer-related death worldwide and poses a significant respiratory disease burden. Little is known about the provision of lung cancer care across Europe. The overall aim of the Task Force was to investigate current practice in lung cancer care across Europe. The Task Force undertook four projects: 1) a narrative literature search on quality management of lung cancer; 2) a survey of national and local infrastructure for lung cancer care in Europe; 3) a benchmarking project on the quality of (inter)national lung cancer guidelines in Europe; and 4) a feasibility study of prospective data collection in a pan-European setting. There is little peer-reviewed literature on quality management in lung cancer care. The survey revealed important differences in the infrastructure of lung cancer care in Europe. The European guidelines that were assessed displayed wide variation in content and scope, as well as methodological quality but at the same time there was relevant duplication. The feasibility study demonstrated that it is, in principle, feasible to collect prospective demographic and clinical data on patients with lung cancer. Legal obligations vary among countries. The European Initiative for Quality Management in Lung Cancer Care has provided the first comprehensive snapshot of lung cancer care in Europe.
Kearney, N; Kidd, L; Miller, M; Sage, M; Khorrami, J; McGee, M; Cassidy, J; Niven, K; Gray, P
2006-07-01
Recent changes in cancer service provision mean that many patients spend a limited time in hospital and therefore experience and must cope with and manage treatment-related side effects at home. Information technology can provide innovative solutions in promoting patient care through information provision, enhancing communication, monitoring treatment-related side effects and promoting self-care. The aim of this feasibility study was to evaluate the acceptability of using handheld computers as a symptom assessment and management tool for patients receiving chemotherapy for cancer. A convenience sample of patients (n = 18) and health professionals (n = 9) at one Scottish cancer centre was recruited. Patients used the handheld computer to record and send daily symptom reports to the cancer centre and receive instant, tailored symptom management advice during two treatment cycles. Both patients' and health professionals' perceptions of the handheld computer system were evaluated at baseline and at the end of the project. Patients believed the handheld computer had improved their symptom management and felt comfortable in using it. The health professionals also found the handheld computer to be helpful in assessing and managing patients' symptoms. This project suggests that a handheld-computer-based symptom management tool is feasible and acceptable to both patients and health professionals in complementing the care of patients receiving chemotherapy.
Molinos-Senante, María; Perez Carrera, Alejo; Hernández-Sancho, Francesc; Fernández-Cirelli, Alicia; Sala-Garrido, Ramón
2014-12-01
Economic studies are essential in evaluating the potential external investment support and/or internal tariffs available to improve drinking water quality. Cost-benefit analysis (CBA) is a useful tool to assess the economic feasibility of such interventions, i.e. to take some form of action to improve the drinking water quality. CBA should involve the market and non-market effects associated with the intervention. An economic framework was proposed in this study, which estimated the health avoided costs and the environmental benefits for the net present value of reducing the pollutant concentrations in drinking water. We conducted an empirical application to assess the economic feasibility of removing arsenic from water in a rural area of Argentina. Four small-scale methods were evaluated in our study. The results indicated that the inclusion of non-market benefits was integral to supporting investment projects. In addition, the application of the proposed framework will provide water authorities with more complete information for the decision-making process.
Feasibility and Pilot Study of the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) Project
Sun, Lena S.; Li, Guohua; DiMaggio, Charles J.; Byrne, Mary W.; Ing, Caleb; Miller, Tonya LK; Bellinger, David C.; Han, Sena; McGowan, Francis X.
2012-01-01
Background Animal studies have documented that exposure of the developing brain to commonly used anesthetic agents induce neurotoxicity and late abnormal neurobehavioral functions as adults. Results from clinical studies have all been performed using existing datasets, and produced inconsistent results. To provide more definitive evidence to address the clinical relevance of anesthetic neurotoxicity in children, an interdisciplinary team of investigators designed and developed the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project. We present pilot study results in 28 sibling pairs recruited and tested at Columbia University Medical Center (CUMC) and Children’s Hospital of Boston (CHB) for the PANDA project. Methods The PANDA project uses an ambi-directional cohort design. We performed prospective neuropsychological assessment in 28 exposed-unexposed sibling pairs ages 6–11 years old. The exposed siblings were ASA 1 or 2 and had received a single episode of anesthesia for inguinal hernia repair prior to age 36 months and the unexposed siblings had no anesthesia before age 36 months. All sibling pairs were English speaking and were 36 weeks gestational age or greater. Each sibling pair underwent direct testing using WASI and NEPSY II, and the parents completed questionnaires related to behavior using CBCL and Conners’ rating. Data are presented as means ± SD. We conducted descriptive analyses of demographic data. We compared exposed and unexposed sibling groups on WASI and NEPSY II, and total and T-scores from CBCL and Conners’ as continuous data by paired t test between. A P< 0.05 was considered significant. Results Following IRB approval for the study at both CUMC and CHB, the full PANDA study protocol was implemented to perform a pilot feasibility study. Our success rate was 96.7% in obtaining detailed medical and anesthesia records in our historical cohort. Scores for verbal IQ (Exposed=106.1±16.3,Unexposed=109.2±17.9), performance IQ (Exposed=109.1±16.0, Unexposed=113.9±15.9) and full IQ (Exposed=108.2±14.0, Unexposed=112.8±16.8) were comparable between siblings. There were no differences between the two groups in T scores for any of the NEPSY II sub-domains, CBCL or Conners’. An abstraction protocol with web-based electronic data capture forms also was developed in conjunction with the International Center for Health Outcomes and Innovation Research (InCHOIR). Conclusions The pilot study provided useful information for feasibility to recruit the sample size and to obtain relevant clinical data. For the final study protocol, both the neuropsychological battery and the age range for testing were revised. Our results confirmed the feasibility of our study approach, and yielded pilot data from neuropsychological testing. PMID:23076226
Investigation of the use and feasibility of speed warning systems.
DOT National Transportation Integrated Search
2014-05-01
This report summarizes a feasibility evaluation of a speed monitoring system that provided speed warning feedback to drivers enrolled in a voluntary program, with particular emphasis on at-risk drivers, especially chronic speeders. This project inclu...
Assessing the feasibility of using TRANSIMS in North Carolina : The Fayetteville - Fort Bragg case.
DOT National Transportation Integrated Search
2000-08-01
This project assesses the feasibility implementing TRANSIMS to accomplish regional transportation modeling in North Carolina. The report summarizes TRANSIMS technology, its data and resource requirements, and typical output results. To gauge TRANSIMS...
Evaluating the feasibility of the KDIGO CKD referral recommendations.
Singh, Karandeep; Waikar, Sushrut S; Samal, Lipika
2017-07-07
In 2012, the international nephrology organization Kidney Disease Improving Global Outcomes (KDIGO) released recommendations for nephrology referral for chronic kidney disease (CKD) patients. The feasibility of adhering to these recommendations is unknown. We conducted a retrospective analysis of the primary care population at Brigham and Women's Hospital (BWH). We translated referral recommendations based upon serum creatinine, estimated glomerular filtration rate (eGFR), and albuminuria into a set of computable criteria in order to project referral volume if the KDIGO referral recommendations were to be implemented. Using electronic health record data, we evaluated each patient using the computable criteria at the times that the patient made clinic visits in 2013. We then compared the projected referral volume with baseline nephrology clinic volume. Out of 56,461 primary care patients at BWH, we identified 5593 (9.9%) who had CKD based on albuminuria or estimated GFR. Referring patients identified by the computable criteria would have resulted in 2240 additional referrals to nephrology. In 2013, this would represent a 38.0% (2240/5892) increase in total nephrology patient volume and 67.3% (2240/3326) increase in new referral volume. This is the first study to examine the projected impact of implementing the 2012 KDIGO referral recommendations. Given the large increase in the number of referrals, this study is suggestive that implementing the KDIGO referral guidelines may not be feasible under current practice models due to a supply-demand mismatch. We need to consider new strategies on how to deliver optimal care to CKD patients using the available workforce in the U.S. health care system.
ERIC Educational Resources Information Center
Quellmalz, Edys S.; Timms, Michael J.; Silberglitt, Matt D.; Buckley, Barbara C.
2012-01-01
This article reports on the collaboration of six states to study how simulation-based science assessments can become transformative components of multi-level, balanced state science assessment systems. The project studied the psychometric quality, feasibility, and utility of simulation-based science assessments designed to serve formative purposes…
Seniors Serving Seniors: Volunteers Promoting Healthy Aging Project. Feasibility Study Report.
ERIC Educational Resources Information Center
Ellis, Cathy
A research study assessed whether health-related agencies and organizations in Regina, Saskatchewan, Canada, were willing to use trained older adults as volunteer health promoters, mentors, and tutors working with other seniors, despite the fact that no other programs in the Regina Health District specifically used older adults in these roles. A…
"MathePraxis"--Connecting First-Year Mathematics with Engineering Applications
ERIC Educational Resources Information Center
Harterich, Jorg; Kiss, Christine; Rooch, Aeneas; Monnigmann, Martin; Darup, Moritz Schulze; Span, Roland
2012-01-01
First-year engineering students often complain about their mathematics courses as the significance of the difficult and abstract calculus to their field of study remains unclear. We report on the project "MathePraxis", a feasibility study which was designed as a means to give first-year students some impression about the use of…
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... feasibility of the proposed effort and provide for the conduct of a requirements analysis study which address... indicate how the results of the requirements analysis study will be incorporated into the proposed system... address requirements analysis, program design, procurement and project management; and, a description of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... feasibility of the Palo Verde Diversion Dam Hydroelectric Project (Palo Verde Diversion Dam Project or project... Southern California Edison transmission line located approximately one mile west of the Palo Verde Dam. An...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... feasibility of the Niagara River Community Hydro Project 2 (Niagara 2 Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydro-skimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A study of the refinery expansion project takes into consideration earlier studies and, equally important, recognizes the extensive work done by TOR in rehabilitating the refinery. The program, carried out in phases because of funding limitations, has addressed the critical repairs and replacements in the process unitsmore » and utilities necessary to prolong the life of the refinery and assure reliability and safe operation. It undertook the task of investigating the feasibility of modernizing and expanding the refinery at Tema, Ghana to meet projected market demands until the year 2005. A process planning study was conducted to select the optimal process and utility configuration which would result in economic benefits to Ghana.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the Federal project for the purpose of benefit-to-cost analysis, as well as subsequent cost... not adversely affect the project's economic feasibility. It provides local sponsors more flexibility...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Joseph Owen; Mosey, Gail
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Newport Indiana Chemical Depot site in Newport, Indiana, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the sitefor possible wind turbine electrical generator installation and estimate the cost, performance, and site impacts of different wind energy options. In addition, the report recommends financing options that could assist in the implementation of a wind system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geiger, J.; Lisell, L.; Mosey, G.
2013-07-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Pueblo of Santo Domingo in Sandoval County, New Mexico, for a renewable energy production feasibility study. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess specific areas on the Pueblo for potential installation of photovoltaic (PV) systems and to estimate the cost, performance, and site impacts of different PV options. The report also recommends financing options that could assist in the implementation of these PV systems.
Space construction system analysis study: Project systems and missions descriptions
NASA Technical Reports Server (NTRS)
1979-01-01
Three project systems are defined and summarized. The systems are: (1) a Solar Power Satellite (SPS) Development Flight Test Vehicle configured for fabrication and compatible with solar electric propulsion orbit transfer; (2) an Advanced Communications Platform configured for space fabrication and compatible with low thrust chemical orbit transfer propulsion; and (3) the same Platform, configured to be space erectable but still compatible with low thrust chemical orbit transfer propulsion. These project systems are intended to serve as configuration models for use in detailed analyses of space construction techniques and processes. They represent feasible concepts for real projects; real in the sense that they are realistic contenders on the list of candidate missions currently projected for the national space program. Thus, they represent reasonable configurations upon which to base early studies of alternative space construction processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moriarty, K.
The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.
Development of smart bridge bearings system : a feasibility study : final report.
DOT National Transportation Integrated Search
2005-12-01
The goal of this project has been achieved through three tasks. The main goal of Task I has been : to identify appropriate sensors that have potential for bridge bearings applications. This has been : achieved through the following subtasks and has b...
FOSTERING SUSTAINABILITY: DESIGNING A GREEN SCIENCE BUILDING AT A SMALL MAINE COLLEGE
The overarching goal of the project ‘as to develop a feasibility study of building design and construction that takes into account the various local conditions, optimizes energy savings. use of building materials, and long term sustainability of the structur...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-26
... study the feasibility of the 649 Water Street Project to be located on the Cobbosseecontee Stream, in.... Applicant Contact: Hoon Won, 275 River Road, P.O. Box 202, Woolwich, ME 04579; (203) 340-2517. FERC Contact...
Water retention techniques for vegetation establishment in TxDOT West Texas districts.
DOT National Transportation Integrated Search
2010-03-01
Water harvesting is the collection of runoff for its productive use and may aid in the germination and : establishment of vegetation seeded in the roadside. This project is a synthesis study on the feasibility and : implications of adapting water har...
WASTE TIRES ON THE ISLAND OF DOMINICA: SURVEY AND SOLUTIONS
Phase I of LFL-Dominica was highly successful, resulting in a completed national tire inventory and Material Flow Analysis, a waste tire feasibility study, expansion of the project to include organic gardens, identification and screening of three sites for potential LFL implem...
Self-consolidating concrete, applications for slip-form paving : phase II.
DOT National Transportation Integrated Search
2011-05-01
The goal of the project was to develop a new type of self-consolidating concrete (SCC) for slip-form paving to simplify construction and make smoother pavements. Developing the new SCC involved two phases: a feasibility study (Phase I sponsored by TP...
AMTD - Advanced Mirror Technology Development in Mechanical Stability
NASA Technical Reports Server (NTRS)
Knight, J. Brent
2015-01-01
Analytical tools and processes are being developed at NASA Marshal Space Flight Center in support of the Advanced Mirror Technology Development (AMTD) project. One facet of optical performance is mechanical stability with respect to structural dynamics. Pertinent parameters are: (1) the spacecraft structural design, (2) the mechanical disturbances on-board the spacecraft (sources of vibratory/transient motion such as reaction wheels), (3) the vibration isolation systems (invariably required to meet future science needs), and (4) the dynamic characteristics of the optical system itself. With stability requirements of future large aperture space telescopes being in the lower Pico meter regime, it is paramount that all sources of mechanical excitation be considered in both feasibility studies and detailed analyses. The primary objective of this paper is to lay out a path to perform feasibility studies of future large aperture space telescope projects which require extreme stability. To get to that end, a high level overview of a structural dynamic analysis process to assess an integrated spacecraft and optical system is included.
Feasibility study on low-dosage digital tomosynthesis (DTS) using a multislit collimation technique
NASA Astrophysics Data System (ADS)
Park, S. Y.; Kim, G. A.; Park, C. K.; Cho, H. S.; Seo, C. W.; Lee, D. Y.; Kang, S. Y.; Kim, K. S.; Lim, H. W.; Lee, H. W.; Park, J. E.; Kim, W. S.; Jeon, D. H.; Woo, T. H.
2018-04-01
In this study, we investigated an effective low-dose digital tomosynthesis (DTS) where a multislit collimator placed between the X-ray tube and the patient oscillates during projection data acquisition, partially blocking the X-ray beam to the patient thereby reducing the radiation dosage. We performed a simulation using the proposed DTS with two sets of multislit collimators both having a 50% duty cycle and investigated the image characteristics to demonstrate the feasibility of this proposed approach. In the simulation, all projections were taken at a tomographic angle of θ = ± 50° and an angle step of Δθ =2°. We utilized an iterative algorithm based on a compressed-sensing (CS) scheme for more accurate DTS reconstruction. Using the proposed DTS, we successfully obtained CS-reconstructed DTS images with no bright-band artifacts around the multislit edges of the collimator, thus maintaining the image quality. Therefore, the use of multislit collimation in current real-world DTS systems can reduce the radiation dosage to patients.
1990-04-01
There are significant differences between the social , economic and environ- mental impacts associated with Option 1, as described in the report when...Engineers, the project is authorized Sink# Pinka by the U.S. Congress. and after the completion of plans and specifications, Stone Memoria zoos which...project. The individuals and businesses who will derive cV act social and economic benefits from this option are not being required to contribute to
Latina, Andrea
2017-12-11
The CLIC study is exploring the scheme for an electron-positron collider with a centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The current goal of the project is to demonstrate the feasibility of the technology by the year 2010. Recently, important progress has been made concerning the high-gradient accelerating structure tests and the experiments with beam in the CLIC test facility, CTF3. On the organizational side, the CLIC international collaborations have significantly gained momentum, boosting the CLIC study.
AgSTAR Market Opportunities Report
Assesses the market potential for biogas energy projects at swine and dairy farms in the United States and characterizes the sizes and types of operations where biogas projects are technically feasible.
DOT National Transportation Integrated Search
1980-01-01
This project was undertaken for the Virginia Department of Transportation Safety to assess the feasibility of implementing the Data Analysis and Reporting Techniques (DART) computer software system in Virginia. Following a review of available literat...
1985-11-01
arranged to maximize thermal output; - Plant will meet PURPA criteria for recognition as a "Qualifying Facility" (QF). 7587A 2 - GFC emissions will be...10. Plant must meet Public Utilities Regulatory Policies Act ( PURPA ) criteria for classification as a "Qualifying Facility" (QF). 11. Visual effect...assessments. 3 The Public Utilities Regulatory Policies Act ( PURPA ) which is administered by the Federal Energy Regulatory Commission (FERC), governs how a
1989-12-01
57 Table 5 Sensitivity Analysis - Point of Pines LPP 61 Table 6 Plan Comparison 64 Table 7 NED Plan Project Costs 96 Table 8 Estimated Operation...Costs 99 Table 13 Selected Plan/Estimated Annual Benefits 101 Table 14 Comparative Impacts - NED Regional Floodgate Plan 102 Table 15 Economic Analysis ...Includes detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project
Jóhannesson, Ómar I.; Balan, Oana; Unnthorsson, Runar; Moldoveanu, Alin; Kristjánsson, Árni
2016-01-01
The Sound of Vision project involves developing a sensory substitution device that is aimed at creating and conveying a rich auditory representation of the surrounding environment to the visually impaired. However, the feasibility of such an approach is strongly constrained by neural flexibility, possibilities of sensory substitution and adaptation to changed sensory input. We review evidence for such flexibility from various perspectives. We discuss neuroplasticity of the adult brain with an emphasis on functional changes in the visually impaired compared to sighted people. We discuss effects of adaptation on brain activity, in particular short-term and long-term effects of repeated exposure to particular stimuli. We then discuss evidence for sensory substitution such as Sound of Vision involves, while finally discussing evidence for adaptation to changes in the auditory environment. We conclude that sensory substitution enterprises such as Sound of Vision are quite feasible in light of the available evidence, which is encouraging regarding such projects. PMID:27355966
Snyder, Daniel T.
2014-01-01
Because of water diversions during summer, flow in Catherine Creek, a tributary to the Grande Ronde River in northeastern Oregon, is insufficient to sustain several aquatic species for which the stream is listed as critical habitat. A feasibility study for managed underground storage (MUS) in the upper Catherine Creek watershed in Union County, Oregon, was undertaken by Anderson Perry and Associates, Inc., to address the issue of low flows in summer. The results of the study were released as a report titled “Upper Catherine Creek Storage Feasibility Study for Grande Ronde Model Watershed,” which evaluated the possibility of diverting Catherine Creek streamflow during winter (when stream discharge is high), storing the water by infiltration or injection into an aquifer adjacent to the stream, and discharging the water back to the stream in summer to augment low flows. The method of MUS would be accomplished using either (1) aquifer storage and recovery (ASR) that allows for the injection of water that meets drinking-water-quality standards into an aquifer for later recovery and use, or (2) artificial recharge (AR) that involves the intentional addition of water diverted from another source to a groundwater reservoir. Concerns by resource managers that the actions taken to improve water availability for upper Catherine Creek be effective, cost-efficient, long-term, and based on sound analysis led the National Fish and Wildlife Foundation to request that the U.S. Geological Survey conduct an independent review and evaluation of the feasibility study. This report contains the results of that review. The primary objectives of the Anderson Perry and Associates study reviewed here included (1) identifying potentially fatal flaws with the concept of using AR and (or) ASR to augment the streamflow of Catherine Creek, (2) identifying potentially favorable locations for augmenting streamflow, (3) developing and evaluating alternatives for implementing AR and (or) ASR, and (4) identifying next steps and estimated costs for implementation. The Anderson Perry study was not intended as a comprehensive evaluation of feasibility, but, rather, an effort to develop a concept and preliminary evaluation of feasibility. Additionally, the feasibility study was limited to using existing data from which additional data needs were to be identified. The feasibility study mostly accomplished the goals of identifying potential fatal flaws and developing a project implementation plan. However, a more practical discussion of conclusions regarding the feasibility, likelihood for success, achievement of goals, and overall project costs could have received greater emphasis and would be of value to decision makers. With regard to objective (2), the subject report analyzed information from several possible sites examined for an MUS system. Sufficient cause is provided in the subject report to identify the basalt aquifer in the Milk Creek sub-area as having the greatest potential for MUS. Therefore, this review is primarily focused on the Milk Creek sub-area and the basalt aquifer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-30
This study, conducted by USX Engineers and Consultants (UEC), Inc., was funded by the US Trade and Development Agency. The report shows the results of UEC`s study concerning the reconstruction of No. 7 Coke Oven Battery operated by Sidex, S.A. at Galati, Romania. This is Volume 2 and it consists of the following: (1) Introduction; (2) Executive Summary; (3) Current Site Conditions; (4) Specifications; (5) Project Capital Cost Estimates and Project Schedule; (6) Financial Information and Cost Analysis; and (7) Environmental Assessment.
34 CFR 1100.21 - What selection criteria does the Director use to rate an applicant?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Education (Continued) NATIONAL INSTITUTE FOR LITERACY NATIONAL INSTITUTE FOR LITERACY: LITERACY LEADER... to the literacy field. (2) The design of the project is strong and feasible. (3) The project... effectiveness of the project. (7) The project results are likely to contribute to the knowledge base in literacy...
34 CFR 1100.21 - What selection criteria does the Director use to rate an applicant?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Education (Continued) NATIONAL INSTITUTE FOR LITERACY NATIONAL INSTITUTE FOR LITERACY: LITERACY LEADER... to the literacy field. (2) The design of the project is strong and feasible. (3) The project... effectiveness of the project. (7) The project results are likely to contribute to the knowledge base in literacy...
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
Delichatsios, Helen K; Hauser, Michelle E; Burgess, Jonathan D; Eisenberg, David M
2015-11-01
Diseases linked to obesity such as cardiovascular disease, diabetes, degenerative joint disease, gastroesophageal reflux, and sleep apnea constitute a large portion of primary care visits. Patients with these conditions often lack knowledge, skills, and support needed to maintain health. Shared medical appointments (SMAs) that include culinary skills and nutrition education offer a novel, cost-effective way to address these diseases in primary care. Adult patients in a primary care practice at a large academic hospital in Boston, Massachusetts, who had at least 1 cardiovascular risk factor were invited to participate in SMAs that included cooking demonstrations and teaching about nutrition in addition to medical management of their conditions. Sessions were conducted by a physician and an assistant in a conference room of a traditional primary care practice as part of a pilot feasibility project. Seventy patients, contributing a total of 156 patient visits, attended 17 nutrition-focused SMAs over a 4-year period. Patients were surveyed after each visit and indicated that they enjoyed the SMAs, would consider alternating SMAs with traditional one-on-one visits, and would recommend SMAs to others. Half would pay out of pocket or a higher copay to attend SMAs. Financially, the practice broke even compared with traditional one-onone office visits. In this feasibility study, chronic disease SMAs conducted with a culinary/nutrition focus were feasible, cost-effective, and well received by patients. Follow-up studies are needed to evaluate short- and long-term outcomes of this SMA model on obesity-related diseases.
Hauser, Michelle E.; Burgess, Jonathan D.; Eisenberg, David M.
2015-01-01
Introduction: Diseases linked to obesity such as cardiovascular disease, diabetes, degenerative joint disease, gastroesophageal reflux, and sleep apnea constitute a large portion of primary care visits. Patients with these conditions often lack knowledge, skills, and support needed to maintain health. Shared medical appointments (SMAs) that include culinary skills and nutrition education offer a novel, cost-effective way to address these diseases in primary care. Methods: Adult patients in a primary care practice at a large academic hospital in Boston, Massachusetts, who had at least 1 cardiovascular risk factor were invited to participate in SMAs that included cooking demonstrations and teaching about nutrition in addition to medical management of their conditions. Sessions were conducted by a physician and an assistant in a conference room of a traditional primary care practice as part of a pilot feasibility project. Results: Seventy patients, contributing a total of 156 patient visits, attended 17 nutrition-focused SMAs over a 4-year period. Patients were surveyed after each visit and indicated that they enjoyed the SMAs, would consider alternating SMAs with traditional one-on-one visits, and would recommend SMAs to others. Half would pay out of pocket or a higher copay to attend SMAs. Financially, the practice broke even compared with traditional one-onone office visits. Conclusion: In this feasibility study, chronic disease SMAs conducted with a culinary/nutrition focus were feasible, cost-effective, and well received by patients. Follow-up studies are needed to evaluate short- and long-term outcomes of this SMA model on obesity-related diseases. PMID:26665019
Coal to methanol feasiblity study: Beluga methanol project. Volume 4: Environmental
NASA Astrophysics Data System (ADS)
1981-09-01
The major environmental issues relevant to development of a coal gasification and methanol fuels production facility and related coal mining activities and transportation systems in the west Cook Inlet area, Alaska were assessed. An extensive review into existing information on the Beluga region of west Cook Inlet was conducted and updated with the findings of land resource projects. Specific field activities then were initiated to expand the environmental data base in areas relevant to this project where there was a paucity of information. Based on these findings the project was reviewed in detail to identify significant environmental issues and to outline the state and federal permit requirements to ensure that these element are an integral component of all subsequent project planning and management decisions.
AAFE man-made noise experiment project. Volume 2: Project and experiment discussions
NASA Technical Reports Server (NTRS)
1974-01-01
An experiment for the acquisition and processing of man-made noise interference data on earth orbital altitudes is discussed. The objectives of the project are to confirm the results of analytical studies concerning radio frequency man-made noise in space. It is stated that the measurements of the amounts and types of noise in frequency bands of interest could allow the allocation and utilization of frequencies to be optimized and would also contribute to the engineering objective of optimizing flight receiving systems. A second objective of the project was to design and fabricate a noise measuring receiver which would demonstrate the feasibility of the experiment design under the project. The procedures for acquiring and processing the electromagnetic radiation data are discussed.
Creation of the First French Database in Primary Care Using the ICPC2: Feasibility Study.
Lacroix-Hugues, V; Darmon, D; Pradier, C; Staccini, P
2017-01-01
The objective of our study was to assess the feasibility of gathering data stored in primary care Electronic Health records (EHRs) in order to create a research database (PRIMEGE PACA project). The software for EHR models of two office and patient data management systems were analyzed; anonymized data was extracted and imported into a MySQL database. An ETL procedure to code text in ICPC2 codes was implemented. Eleven general practitioners (GPs) were enrolled as "data producers" and data were extracted from 2012 to 2015. In this paper, we explain the ways to make this process feasible as well as illustrate its utility for estimating epidemiological indicators and professional practice assessments. Other software is currently being analyzed for integration and expansion of this panel of GPs. This experimentation is recognized as a robust framework and is considered to be the technical foundation of the first regional observatory of primary care data.
Elsey, Helen; Farragher, Tracey; Tubeuf, Sandy; Bragg, Rachel; Elings, Marjolein; Brennan, Cathy; Gold, Rochelle; Shickle, Darren; Wickramasekera, Nyantara; Richardson, Zoe; Cade, Janet; Murray, Jenni
2018-03-17
To assess the feasibility of conducting a cost-effectiveness study of using care farms (CFs) to improve quality of life and reduce reoffending among offenders undertaking community orders (COs). To pilot questionnaires to assess quality of life, connection to nature, lifestyle behaviours, health and social-care use. To assess recruitment and retention at 6 months and feasibility of data linkage to Police National Computer (PNC) reconvictions data and data held by probation services. Pilot study using questionnaires to assess quality of life, individually linked to police and probation data. The pilot study was conducted in three probation service regions in England. Each site included a CF and at least one comparator CO project. CFs are working farms used with a range of clients, including offenders, for therapeutic purposes. The three CFs included one aquaponics and horticulture social enterprise, a religious charity focusing on horticulture and a family-run cattle farm. Comparator projects included sorting secondhand clothes and activities to address alcohol misuse and anger management. We recruited 134 adults (over 18) serving COs in England, 29% female. 52% of participants completed follow-up questionnaires. Privatisation of UK probation trusts in 2014 negatively impacted on recruitment and retention. Linkage to PNC data was a more successful means of follow-up, with 90% consenting to access their probation and PNC data. Collection of health and social-care costs and quality-adjusted life year derivation were feasible. Propensity score adjustment provided a viable comparison method despite differences between comparators. We found worse health and higher reoffending risk among CF participants due to allocation of challenging offenders to CFs, making risk of reoffending a confounder. Recruitment would be feasible in a more stable probation environment. Follow-up was challenging; however, assessing reconvictions from PNC data is feasible and a potential primary outcome for future studies. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
NASA Technical Reports Server (NTRS)
1983-01-01
Meniscus coates tests, back junction formation using a new boron containing liquid, tests of various SiO2 and boron containing liquids, pelletized silicon for replenishment during web growth, and ion implantation compatibility/feasibility study are discussed.
DOT National Transportation Integrated Search
1990-02-01
From 1979 to 1983 the Oregon State Highway Division participated with the FHWA in a demonstration Project to evaluate the feasibility of manufacturing precast, prestressed marine piles from advanced structural materials. The materials that were evalu...
OPTIMIZING BIOVENTING IN SHALLOW VADOSE ZONES AND COLD CLIMATES
This paper describes a bioventing study design and initial activities applied to a JP-4 jet fuel spill at Eielson Air Force Base, Alaska. The primary objectives of the project were to investigate the feasibility of using bioventing technology to remediate JP-4 jet fuel contaminat...
Several regions in the Republic of Kazakhstan and throughout the former USSR are contaminated with mercury resulting from industrial releases. Our studies conducted under the ISTC K-756 Project were directed towards determining the feasibility of developing a biological filter, w...
DOT National Transportation Integrated Search
2015-04-01
A series of studies on the effectiveness, feasibility, and costs of composting as a means of managing animal mortality : removed from roadways has been conducted at the Virginia Center for Transportation Innovation and Research (VCTIR). In : these st...
Feasibility Study of RFID Technology for Construction Load Tracking
DOT National Transportation Integrated Search
2011-12-31
RFID technology was proven to be successful in tracking dump trucks from loading plant to a paver location on a highway project. The average roundtrip time was 1 hour and 4 minutes. However, 3% of this data has truck delivery times in excess of 2 hou...
7 CFR 4280.180 - Actions prior to grant closing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.180 Actions prior to grant closing... funds. Applicants expecting funds from other sources for use in completing projects being partially...
7 CFR 4280.180 - Actions prior to grant closing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.180 Actions prior to grant closing... funds. Applicants expecting funds from other sources for use in completing projects being partially...
7 CFR 4280.180 - Actions prior to grant closing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System Feasibility Study Grants § 4280.180 Actions prior to grant closing... funds. Applicants expecting funds from other sources for use in completing projects being partially...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13760-000] Music Mountain..., Motions To Intervene, and Competing Applications August 9, 2010. On May 18, 2010, Music Mountain Hydro..., proposing to study the feasibility of the Music [[Page 49930
DOT National Transportation Integrated Search
2008-09-01
In recent years, several research projects have been conducted to study the feasibility of increasing the allowable : compressive stress in concrete at prestress transfer, currently defined as 0.60f'ci in the AASHTO LRFD Bridge : Design Specification...
77 FR 36419 - Feasibility of Enumerating “Specially Designed” Components
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... feasibility of positively identifying ``specially designed'' ``components'' on the Commerce Control List (CCL... exhaustive lists of the ``specially designed'' ``components'' referred to in certain Export Control... project involving minimizing the use of the term ``specially designed'' on the current Commerce Control...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
45 CFR 63.6 - Evaluation of applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... policy objectives; (2) Feasibility of the project; (3) Soundness of research design, statistical... qualifications and experience, including managerial, of personnel; (8) Adequacy of facilities and other resources... demonstrate to other potential users that such methods or techniques are feasible and cost-effective; (3) That...
Development of a neural network for early detection of renal osteodystrophy
NASA Astrophysics Data System (ADS)
Cheng, Shirley N.; Chan, Heang-Ping; Adler, Ronald; Niklason, Loren T.; Chang, Chair-Li
1991-07-01
Bone erosion presenting as subperiosteal resorption on the phalanges of the hand is an early manifestation of hyperparathyroidism associated with chronic renal failure. At present, the diagnosis is made by trained radiologists through visual inspection of hand radiographs. In this study, a neural network is being developed to assess the feasibility of computer-aided detection of these changes. A two-pass approach is adopted. The digitized image is first compressed by a Laplacian pyramid compact code. The first neural network locates the region of interest using vertical projections along the phalanges and then the horizontal projections across the phalanges. A second neural network is used to classify texture variations of trabecular patterns in the region using a concurrence matrix as the input to a two-dimensional sensor layer to detect the degree of associated osteopenia. Preliminary results demonstrate the feasibility of this approach.
An engineering database management system for spacecraft operations
NASA Technical Reports Server (NTRS)
Cipollone, Gregorio; Mckay, Michael H.; Paris, Joseph
1993-01-01
Studies at ESOC have demonstrated the feasibility of a flexible and powerful Engineering Database Management System in support for spacecraft operations documentation. The objectives set out were three-fold: first an analysis of the problems encountered by the Operations team in obtaining and managing operations documents; secondly, the definition of a concept for operations documentation and the implementation of prototype to prove the feasibility of the concept; and thirdly, definition of standards and protocols required for the exchange of data between the top-level partners in a satellite project. The EDMS prototype was populated with ERS-l satellite design data and has been used by the operations team at ESOC to gather operational experience. An operational EDMS would be implemented at the satellite prime contractor's site as a common database for all technical information surrounding a project and would be accessible by the cocontractor's and ESA teams.
NASA Astrophysics Data System (ADS)
1982-04-01
The feasibility of a geothermal heating system at the Ojo Caliente Mineral Springs Co. was investigated. The geothermal energy will be used to preheat hot water for the laundry facilities and to heat the water for a two pipe fan coil heating system in the hotel. Present annual heating fuel costs of $11,218 for propane will be replaced by electricity to operate fans and pump at an annual cost of $2547, resulting in a net savings of $8671. Installation costs include $10,100 for a well system, $1400 for a laundry system, and $41,100 for a heating system. With the addition of a 10% design fee the total installation cost is $57,860. Ignoring escalating propane fuel prices, tax credits for energy conservation equipment, and potential funding from the State of New Mexico for a geothermal demonstration project, the simple economic payback period for this project is 6.7 years.
Review of past research and proposed action plan for landfill gas-to-energy applications in India.
Siddiqui, Faisal Zia; Zaidi, Sadaf; Pandey, Suneel; Khan, Mohd Emran
2013-01-01
Open dumps employed for disposal of municipal solid waste (MSW) are generally referred to as landfills and have been traditionally used as the ultimate disposal method in India. The deposition of MSW in open dumps eventually leads to uncontrolled emission of landfill gas (LFG). This article reviews the MSW disposal practices and LFG emissions from landfills in India during the period 1994 to 2011. The worldwide trend of feasibility of LFG to energy recovery projects and recent studies in India indicate a changed perception of landfills as a source of energy. However, facilitating the implementation of LFG to energy involves a number of challenges in terms of technology, developing a standardized framework and availability of financial incentives. The legislative framework for promotion of LFG to energy projects in India has been reviewed and a comprehensive strategy and action plan for gainful LFG recovery is suggested. It is concluded that the market for LFG to energy projects is not mature in India. There are no on-ground case studies to demonstrate the feasibility of LFG to energy applications. Future research therefore should aim at LFG emission modeling studies at regional level and based on the results, pilot studies may be conducted for the potential sites in the country to establish LFG to energy recovery potential from these landfills.
Three-dimensional displacement measurement by fringe projection and speckle photography
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barrientos, B.; Garcia-Marquez, J.; Cerca, M.
2008-04-15
3D displacement fields are measured by the combination of two optical methods, fringe projection and speckle photography. The use of only one camera recording the necessary information implies that no calibration procedures are necessary as is the case in techniques based on stereoscopy. The out-of-plane displacement is measured by fringe projection whereas speckle photography yields the 2-D in-plane component. To show the feasibility of the technique, we analyze a detailed morphological spatio-temporal evolution of a model of the Earth's crust while subjected to compression forces. The results show that the combination of fringe projection and speckle photography is well suitedmore » for this type of studies.« less
University Manpower in Fossil Energy Research and Development: A Data Collection Feasibility Study.
ERIC Educational Resources Information Center
Finn, Michael G.; And Others
Presented are data on university researchers engaged in fossil fuel studies funded by the U.S. Department of Energy (DOE). This information relates to research personnel whose projects were active during 1977 and/or 1978. Frequency and percentage tabulations delineate person-months of graduate student, faculty, and staff research inputs by…
Selective Energy Feasibility Study -- Richmond College, City University of New York
ERIC Educational Resources Information Center
Consulting Engineer, 1974
1974-01-01
A study of the presently available data on magnitude, duration, and coincidence of electrical demands determined that onsite electrical power generation in the form of a selective energy system should be incorporated within the central utilities plant projected for the Richmond College Campus of the City University of New York (CUNY). (Author/MLF)
Best practices for budget-based design.
DOT National Transportation Integrated Search
2017-03-01
State Departments of Transportation (State DOTs) encounter difficulties in establishing feasible and : reliable project budget early in the project development. The lack of a systematic process for establishing : baseline budget with the consideratio...
7 CFR 4280.111 - Application and documentation.
Code of Federal Regulations, 2010 CFR
2010-01-01
...: (i) Title. Provide a descriptive title of the project (identified on SF 424). (ii) Applicant... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.111 - Application and documentation.
Code of Federal Regulations, 2011 CFR
2011-01-01
...: (i) Title. Provide a descriptive title of the project (identified on SF 424). (ii) Applicant... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
NASA Technical Reports Server (NTRS)
1979-01-01
The feasibility of Union Carbide's silane process for commercial application was established. An integrated process design for an experimental process system development unit and a commercial facility were developed. The corresponding commercial plant economic performance was then estimated.
24 CFR 241.1010 - Feasibility letter.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... Commissioner's estimate of the supportable loan amount, based upon the project's equity in the case of an equity loan and based on the project's purchase price in the case of an acquisition loan, but such...
1993-10-01
Disposal Act (SWDA)/Resource Conservation and Recovery Act (RCRA). Jacobs Englnwfng Gmo Inc FINAL PROJECT WORK PLAN Washington Operatvo 8~ Fs 2-551I Date...shaded map of contaminated areas defined by chemical data, more than one map may be consructed f special and grapk cons *tft ame encountered. Results...that a Siophysical c ao p Pro rma down the axis or Beah PointS using geophysic teehnozoglosts that are •vi subsurface hyd&rosAdgraphic cmal beneath
Total energy food plant 21 million gallon ethanol facility
NASA Astrophysics Data System (ADS)
1981-10-01
The Phase I Engineering study includes the following: process description, waste water treatment plant, material summary, energy chart, capital cost estimate, equipment list, personnel requirements, drawings list, specifications list, and project schedule. The economic and financial feasibility of the technical process, and environmental, health, safety, and socio-economic assessments for the project are reported. The costs for extending the following utilities to the property line of the selected site are presented: potable water, sewer system, electricity, roads for truck traffic, and rail service.
1985-07-01
and Operation 132 6.7.5 Safety 135 6.7.6 System Control Description 136 6.7.6.1 Coal Gasification 136 6.7.6.2 Gas Cooling, Cleaning and Compression...the hydrogen content. The gas is then desulfurized and heated before final polishing and feeding to the fuel cell. Receiving compressed fuel gas and...4 CO Shift 1 Stretford Desulfurizer 3 Gas Compressors 3 Material Handling(3) 3 Subtotal 39 Scheduled Shutdown 14 Total Annual Shutdown 53
Re-Emerging Malaria Vectors in Rural Sahel (nouna, Burkina Faso): the Paluclim Project
NASA Astrophysics Data System (ADS)
Vignolles, Cécile; Sauerborn, Rainer; Dambach, Peter; Viel, Christian; Soubeyroux, Jean-Michel; Sié, Ali; Rogier, Christophe; Tourre, Yves M.
2016-06-01
The Paluclim project applied the tele-epidemiology approach, linking climate, environment and public health (CNES, 2008), to rural malaria in Nouna (Burkina Faso). It was to analyze the climate impact on vectorial risks, and its consequences on entomological risks forecast. The objectives were to: 1) produce entomological risks maps in the Nouna region, 2) produce dynamic maps on larvae sites and their productivity, 3) study the climate impact on malaria risks, and 4) evaluate the feasibility of strategic larviciding approach.
1985-06-01
production; - Plant will meet PURPA criteria for recognition as a "Qualifying Facility" (QF). - Plant design allows for sale of byproducts, decreasing...export to the HCP be the minimum necessary to meet PURPA requirements and the remaining steam be used to produce electric power. Since the fuel cell...Policies Act ( PURPA ) criteria to be classified as a "Qualifying Facility" (QF). 14. Plant site conditions are as summarized in Table 2-1. I 9I I I IL
NASA Astrophysics Data System (ADS)
Childs-Gleason, L. M.; Ross, K. W.; Crepps, G.; Miller, T. N.; Favors, J. E.; Rogers, L.; Allsbrook, K. N.; Bender, M. R.; Ruiz, M. L.
2015-12-01
NASA's DEVELOP National Program fosters an immersive research environment for dual capacity building. Through rapid feasibility Earth science projects, the future workforce and current decision makers are engaged in research projects to build skills and capabilities to use Earth observation in environmental management and policy making. DEVELOP conducts over 80 projects annually, successfully building skills through partnerships with over 150 organizations and providing over 350 opportunities for project participants each year. Filling a void between short-term training courses and long-term research projects, the DEVELOP model has been successful in supporting state, local, federal and international government organizations to adopt methodologies and enhance decision making processes. This presentation will highlight programmatic best practices, feedback from participants and partner organizations, and three sample case studies of successful adoption of methods in the decision making process.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...
DOT National Transportation Integrated Search
1999-12-01
This project assessed the feasibility of high-occupancy vehicle (HOV) and high-occupancy vehicle/toll (HOT) facilities. In the first report of this project, current operational facilities were described and guidelines for the operation, design, agenc...
Economic evaluation of environmental epidemiological projects in national industrial complexes.
Shin, Youngchul
2017-01-01
In this economic evaluation of environmental epidemiological monitoring projects, we analyzed the economic feasibility of these projects by determining the social cost and benefit of these projects and conducting a cost/benefit analysis. Here, the social cost was evaluated by converting annual budgets for these research and survey projects into present values. Meanwhile, the societal benefit of these projects was evaluated by using the contingent valuation method to estimate the willingness-to-pay of residents living in or near industrial complexes. In addition, the extent to which these projects reduced negative health effects (i.e., excess disease and premature death) was evaluated through expert surveys, and the analysis was conducted to reflect the unit of economic value, based on the cost of illness and benefit transfer method. The results were then used to calculate the benefit of these projects in terms of the decrease in negative health effects. For residents living near industrial complexes, the benefit/cost ratio was 1.44 in the analysis based on resident surveys and 5.17 in the analysis based on expert surveys. Thus, whichever method was used for the economic analysis, the economic feasibility of these projects was confirmed.
Design and Implementation of a New System for Large Bridge Monitoring—GeoSHM
Xie, Yilin; Ince, Sean; Ye, Jun; Bhatia, Paul
2018-01-01
Structural Health Monitoring (SHM) is a relatively new branch of civil engineering that focuses on assessing the health status of infrastructure, such as long-span bridges. Using a broad range of in-situ monitoring instruments, the purpose of the SHM is to help engineers understand the behaviour of structures, ensuring their structural integrity and the safety of the public. Under the Integrated Applications Promotion (IAP) scheme of the European Space Agency (ESA), a feasibility study (FS) project that used the Global Navigation Satellite Systems (GNSS) and Earth Observation (EO) for Structural Health Monitoring of Long-span Bridges (GeoSHM) was initiated in 2013. The GeoSHM FS Project was led by University of Nottingham and the Forth Road Bridge (Scotland, UK), which is a 2.5 km long suspension bridge across the Firth of Forth connecting Edinburgh and the Northern part of Scotland, was selected as the test structure for the GeoSHM FS project. Initial results have shown the significant potential of the GNSS and EO technologies. With these successes, the FS project was further extended to the demonstration stage, which is called the GeoSHM Demo project where two other long-span bridges in China were included as test structures. Led by UbiPOS UK Ltd. (Nottingham, UK), a Nottingham Hi-tech company, this stage focuses on addressing limitations identified during the feasibility study and developing an innovative data strategy to process, store, and interpret monitoring data. This paper will present an overview of the motivation and challenges of the GeoSHM Demo Project, a description of the software and hardware architecture and a discussion of some primary results that were obtained in the last three years. PMID:29510534
2017-10-01
USER GUIDE 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening-Level Feasibility Assessment and Design Tool in...Support of 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) ESTCP Project ER-201326 OCTOBER 2017 Rob Hinchee Integrated Science...Technology, Inc. 1509 Coastal Highway Panacea, FL 32346 8/8/2013 - 8/8/2018 10-2017 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening
Feasibility Studies of Optical Processing of Image Bandwidth Compression Schemes.
1983-05-15
R.N. STRICKIAND AFOSR-81-O170 R.A. SCHOWENGERDT S. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT, PROJECT. TASK Ur,;t. o4 o . AREA & WORK...is the intent of research sponsored under this Grant to direct investi- gation into the following issues: () formulation of alternative architechtural
Middle Sacramento River Refuge: A Feasibility Study
Charles J. Houghten; Frank J. Michny
1989-01-01
The woodlands and other streamside habitat of the Sacramento River's riparian system have been severely reduced within the last century. This riparian habitat and its ability to sustain diverse populations of fish, migratory birds, mammals, and other wildlife have been significantly impacted by water control projects, agricultural developments, and other land uses...
DOT National Transportation Integrated Search
2017-10-01
The purpose of this research study is to determine if the implementation of FTIRS in Louisiana for determining polymer content in asphalt mixtures and for quality control of recycled asphalt mixtures is feasible. The ultimate objective is to develop ...
Winchester Lake, Idaho (17060306) is an 85 acre recreation site located approximately 30 miles southeast of Lewiston. The lake has been involved in the U.S. EPA Clean Lakes Program since 1988. The Phase I Diagnostic and Feasibility Study, completed in February 1990, identified t...
Exploring the Utility of a Virtual Performance Assessment
ERIC Educational Resources Information Center
Clarke-Midura, Jody; Code, Jillianne; Zap, Nick; Dede, Chris
2011-01-01
With funding from the Institute of Education Sciences (IES), the Virtual Performance Assessment project at the Harvard Graduate School of Education is developing and studying the feasibility of immersive virtual performance assessments (VPAs) to assess scientific inquiry of middle school students as a standardized component of an accountability…
Virtual Service, Real Data: Results of a Pilot Study.
ERIC Educational Resources Information Center
Kibbee, Jo; Ward, David; Ma, Wei
2002-01-01
Describes a pilot project at the University of Illinois at Urbana-Champaign reference and undergraduate libraries to test the feasibility of offering real-time online reference service via their Web site. Discusses software selection, policies and procedures, promotion and marketing, user interface, training and staffing, data collection, and…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... systems and for energy efficiency improvement projects; grants for conducting energy audits; grants for... grants and guaranteed loans; Energy audit and renewable energy development assistance grants; and... subpart C to address energy audit and renewable energy development assistance grants. Together, these two...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... DEPARTMENT OF VETERANS AFFAIRS Clinical Science Research and Development Service Cooperative... Clinical Science Research and Development Service on the relevance and feasibility of proposed projects and... notice under Public Law 92-463 (Federal Advisory Committee Act) that a meeting of the Clinical Science...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... DEPARTMENT OF VETERANS AFFAIRS Clinical Science Research and Development Service Cooperative... under the Federal Advisory Committee Act, 5 U.S.C. App. 2, that the Clinical Science Research and... Clinical Science Research and Development Service on the relevance and feasibility of proposed projects and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... DEPARTMENT OF VETERANS AFFAIRS Clinical Science Research and Development Service Cooperative... under the Federal Advisory Committee Act, 5 U.S.C. App. 2, that the Clinical Science Research and... Science Research and Development Service on the relevance and feasibility of proposed projects and the...
EVALUATING POINT-NONPOINT SOURCE WATER QUALITY TRADING IN A RARITAN RIVER BASIN SUB-WATERSHED
This project addresses water quality issues in the Raritan River Basin of New Jersey. It will build upon an existing study that determined the technical feasibility of implementing a point-nonpoint source water quality trading program in the Basin. Water quality trading is ...
DOT National Transportation Integrated Search
1975-08-01
The purpose of this study was to determine the feasibility of using an : expansive cement, TXI 4C Chem Comp, in lieu of the regular Type I Portland : Cement in a cement stabilized gravel screenings base so as to eliminate : or reduce cracks associate...
This project involves the real-time measurement of air quality using open-path IR spectroscopy. A prototype open-path tunable laser absorption spectroscopy instrument was designed, built, and successfully operated for several hundred hours between October and December 2000. The...
Brief reconnaissance study for the addition of hydropower for Lake Manatee Dam, Bradenton, Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gebhard, T.G. Jr.
1983-02-24
The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that the development of hydroelectric power at this site does not appear to be economically feasible. (MHR)
DOE studies on coal-to-liquids
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2007-07-01
The US DOE National Energy Technology Laboratory has issued reports that examine the feasibility of coal-to-liquids (CTL) facilities, both general and site specific, which are available at www.netl.gov/energy-analyses/ref-shelf.html. The US Department of Defence has been investigating use of Fischer-Tropsch fuels. Congress is considering various CTL proposals while the private sector is building pilot plants and performing feasibility studies for proposed plants. The article includes a table listing 14 coal-to-liquids plants under consideration. The private sector has formed the coal-to-liquids coalition (www.futurecoalfuels.org). The article mentions other CTL projects in South Africa, China, Indonesia, the Philippines and New Zealand. 1 tab.
Feasibility Study for Paragon - Bisti Solar Ranch
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benally, Thomas
2015-06-01
The Navajo Hopi Land Commission Office (NHLCO) and Navajo Nation (NN) plan to develop renewable energy (RE) projects on the Paragon-Bisti Ranch (PBR) lands, set aside under the Navajo Hopi Land Settlement Act (NHLSA) for the benefit of Relocatees. This feasibility study (FS), which was funded under a grant from DOE’s Tribal Energy Program (TEP), was prepared in order to explore the development of the 22,000-acre PBR in northwestern New Mexico for solar energy facilities. Topics covered include: • Site Selection • Analysis of RE, and a Preliminary Design • Transmission, Interconnection Concerns and Export Markets • Financial and Economicmore » Analysis • Environmental Study • Socioeconomic and Cultural Factors • Next Steps.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, R.J.; Barickman, F.S.; Spelt, P.F.
1998-01-01
A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated.more » This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.« less
Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, Bruce Albert
The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutianmore » Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.« less
Integrating the Complete Research Project into a Large Qualitative Methods Course
ERIC Educational Resources Information Center
Raddon, Mary-Beth; Nault, Caleb; Scott, Alexis
2008-01-01
Participatory exercises are standard practice in qualitative methods courses; less common are projects that engage students in the entire research process, from research design to write-up. Although the teaching literature provides several models of complete research projects, their feasibility, and appropriateness for large, compulsory,…
Great Basin Native Plant Project: 2015 Progress Report
Francis Kilkenny; Fred Edwards; Alexis Malcomb
2016-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead...
7 CFR 4284.908 - Use of grant and matching funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... carrying out relevant projects. Matching funds must be provided for the balance of costs. (c) Matching..., or hire a qualified consultant to conduct, a feasibility analysis of the proposed value added project to help determine the potential success of the project; (2) Develop, or hire a qualified consultant...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13643-000] Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...
Project Crossroads as Pre-Trial Intervention. A Program Evaluation.
ERIC Educational Resources Information Center
Rovner-Pieczenik, Roberta
This report describes and evaluates Project Crossroads, a manpower approach to the rehabilitation of accused offenders prior to adjudication. In order to demonstrate the feasibility of working with the court and its personnel to provide a pretrial intervention alternative for youthful first-time offenders, Project Crossroads provided a…
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...
Feasibility and pilot study of the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project.
Sun, Lena S; Li, Guohua; DiMaggio, Charles J; Byrne, Mary W; Ing, Caleb; Miller, Tonya L K; Bellinger, David C; Han, Sena; McGowan, Francis X
2012-10-01
Animal studies have documented that exposure of the developing brain to commonly used anesthetic agents induces neurotoxicity and late abnormal neurobehavioral functions as adults. Results from clinical studies have all been analyzed using existing data sets, and these studies produced inconsistent results. To provide more definitive evidence to address the clinical relevance of anesthetic neurotoxicity in children, an interdisciplinary team of investigators designed and developed the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project. We present pilot study results in 28 sibling pairs recruited and tested at the Columbia University Medical Center (CUMC) and Children's Hospital of Boston (CHB) for the PANDA project. The PANDA project uses an ambidirectional cohort design. We performed prospective neuropsychological assessment in 28 exposed-unexposed sibling pairs from 6 to 11 years of age. The exposed siblings were ASA 1 or 2 and had received a single episode of anesthesia for inguinal hernia repair before the age of 36 months and the unexposed siblings had no anesthesia before the age of 36 months. All the sibling pairs were English speaking and were 36 weeks of gestational age or older. Each sibling pair underwent a direct testing using the Wechsler Abbreviated Scale of Intelligence (WASI) and the NEuroPSYchological Assessment, second edition (NEPSY II), and the parents completed questionnaires related to behavior using CBCL and Conners rating. Data are presented as means±SD. We conducted descriptive analyses of the demographic data. We compared both the exposed and the unexposed sibling groups on WASI and NEPSY II, and total and T scores from CBCL and Conners rating were analyzed as continuous data using the paired t test between the two groups. A P<0.05 was considered significant. After the Institutional Review Board approval for the study at both CUMC and CHB, the full PANDA study protocol was implemented to perform a pilot feasibility study. Our success rate was 96.7% in obtaining detailed medical and anesthesia records in our historical cohort. The scores for verbal IQ (exposed=106.1±16.3, unexposed=109.2±17.9), performance IQ (exposed=109.1±16.0, unexposed=113.9±15.9), and full IQ (exposed=108.2±14.0, unexposed=112.8±16.8) were comparable between the siblings. There were no differences between the two groups in T scores for any of the NEPSY II subdomains, CBCL, or Conners rating. An abstraction protocol with web-based electronic data capture forms also was developed in conjunction with the International Center for Health Outcomes and Innovation Research (InCHOIR). The pilot study provided useful information for feasibility to recruit the sample size and to obtain relevant clinical data. For the final study protocol, both the neuropsychological battery and the age range for testing were revised. Our results confirmed the feasibility of our study approach and yielded pilot data from neuropsychological testing.
EVALUATION OF THE EFFECTS ON BENTHIC ORGANISMS FROM CLAY FLOCCULATION OF RED TIDE ORGANISMS
Evaluating the feasibility of controlling red tide using clay flocculation is part of an ECOHAB-funded project. One aspect for the feasibility and future application of clays is the determination of potential negative environmental impacts. The removal of toxin-containing dinofl...
Brownie, Sharon Mary; Thomas, Janelle
2014-09-01
This brief discusses the policy implications of a research study commissioned by Health Workforce Australia (HWA) within its health workforce innovation and reform work program. The project explored conceptually complex and operationally problematic concepts related to developing a whole-of-workforce competency-based education and training and competency-based career framework for the Australian health workforce and culminated with the production of three reports published by HWA. The project raised important queries as to whether such a concept is desirable, feasible or implementable - in short what is the potential value add and is it achievable? In setting the scene for discussion, the foundation of the project's genesis and focus of the study are highlighted. A summary of key definitions related to competency-based education and training frameworks and competency-based career frameworks are provided to further readers' commonality of understanding. The nature of the problem to be solved is explored and the potential value-add for the Australian health workforce and its key constituents proposed. The paper concludes by discussing relevance and feasibility issues within Australia's current and changing healthcare context along with the essential steps and implementation realities that would need to be considered and actioned if whole-of-workforce frameworks were to be developed and implemented.
Commuter Connection : Flexible Ridesharing in Marin County, California
DOT National Transportation Integrated Search
1981-12-01
This is a final report documenting the Commuter Connection Flexible Registered Ridesharing Demonstration Project. The purpose of this project was to test the feasibility of flexible registered ridesharing, which is a system whereby registered commute...
Hovercraft Underwater Noise Measurements in Alaska.
DOT National Transportation Integrated Search
2001-04-02
The United States Postal Service (USPS) is finishing a two-year demonstration project : examining the feasibility of mail delivery via hovercraft to remote Alaskan villages. Prior to this : demonstration project, and in support of the Environmental A...
Assessing the SunGuide and STEWARD databases.
DOT National Transportation Integrated Search
2017-02-01
This project evaluated the feasibility of using the existing software and data bases as platforms : for analyzing the attributes of electric vehicles within present and future transportation : infrastructure projects and models. The Florida based Sun...
Perry, R.W.; Farley, M.J.; Hansen, G.S.; Shurtleff, D.J.; Rondorf, D.W.; LeCaire, R.
2003-01-01
In 1995, the Chief Joseph Kokanee Enhancement Project was established to mitigate the loss of anadromous fish due to the construction of Chief Joseph and Grand Coulee dams. The objectives of the Chief Joseph Enhancement Project are to determine the status of resident kokanee (Oncorhynchus nerka) populations above Chief Joseph and Grand Coulee dams and to enhance kokanee and rainbow trout (Oncorhynchus mykiss) populations. Studies conducted at Grand Coulee Dam documented substantial entrainment of kokanee through turbines at the third powerhouse.
A study of Minnesota forests and lakes using data from earth resources technology satellites
NASA Technical Reports Server (NTRS)
1972-01-01
This project is to foster and develop new applications of remote sensing under an interdisciplinary effort. Seven reports make up the specific projects presently being conducted throughout the State of Minnesota in cooperation with several agencies and municipalities. These are included under the general headings of: (1) applications of aerial photography and ERTS-1 data to agricultural, forest, and water resources management; (2) classification and dynamics of water and wetland resources of Minnesota; (3) studies of Lake Superior Bay; and (4) feasibility of detecting major air pollutants by earth-oriented satellite-borne sensors.
Feasibilities of a Coal-Biomass to Liquids Plant in Southern West Virginia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhattacharyya, Debangsu; DVallance, David; Henthorn, Greg
This project has generated comprehensive and realistic results of feasibilities for a coal-biomass to liquids (CBTL) plant in southern West Virginia; and evaluated the sensitivity of the analyses to various anticipated scenarios and parametric uncertainties. Specifically the project has addressed economic feasibility, technical feasibility, market feasibility, and financial feasibility. In the economic feasibility study, a multi-objective siting model was developed and was then used to identify and rank the suitable facility sites. Spatial models were also developed to assess the biomass and coal feedstock availabilities and economics. Environmental impact analysis was conducted mainly to assess life cycle analysis and greenhousemore » gas emission. Uncertainty and sensitivity analysis were also investigated in this study. Sensitivity analyses on required selling price (RSP) and greenhouse gas (GHG) emissions of CBTL fuels were conducted according to feedstock availability and price, biomass to coal mix ratio, conversion rate, internal rate of return (IRR), capital cost, operational and maintenance cost. The study of siting and capacity showed that feedstock mixed ratio limited the CBTL production. The price of coal had a more dominant effect on RSP than that of biomass. Different mix ratios in the feedstock and conversion rates led to RSP ranging from $104.3 - $157.9/bbl. LCA results indicated that GHG emissions ranged from 80.62 kg CO 2 eq to 101.46 kg CO2 eq/1,000 MJ of liquid fuel at various biomass to coal mix ratios and conversion rates if carbon capture and storage (CCS) was applied. Most of water and fossil energy were consumed in conversion process. Compared to petroleum-derived-liquid fuels, the reduction in GHG emissions could be between -2.7% and 16.2% with CBTL substitution. As for the technical study, three approaches of coal and biomass to liquids, direct, indirect and hybrid, were considered in the analysis. The process models including conceptual design, process modeling and process validation were developed and validated for different cases. Equipment design and capital costs were investigated on capital coast estimation and economical model validation. Material and energy balances and techno-economic analysis on base case were conducted for evaluation of projects. Also, sensitives studies of direct and indirect approaches were both used to evaluate the CBTL plant economic performance. In this study, techno-economic analysis were conducted in Aspen Process Economic Analyzer (APEA) environment for indirect, direct, and hybrid CBTL plants with CCS based on high fidelity process models developed in Aspen Plus and Excel. The process thermal efficiency ranges from 45% to 67%. The break-even oil price ranges from $86.1 to $100.6 per barrel for small scale (10000 bbl/day) CBTL plants and from $65.3 to $80.5 per barrel for large scale (50000 bbl/day) CBTL plants. Increasing biomass/coal ratio from 8/92 to 20/80 would increase the break-even oil price of indirect CBTL plant by $3/bbl and decrease the break-even oil price of direct CBTL plant by about $1/bbl. The order of carbon capture penalty is direct > indirect > hybrid. The order of capital investment is hybrid (with or without shale gas utilization) > direct (without shale gas utilization) > indirect > direct (with shale gas utilization). The order of thermal efficiency is direct > hybrid > indirect. The order of break-even oil price is hybrid (without shale gas utilization) > direct (without shale gas utilization) > hybrid (with shale gas utilization) > indirect > direct (with shale gas utilization).« less
NASA Astrophysics Data System (ADS)
Bundschuh, V.; Grueter, J. W.; Kleemann, M.; Melis, M.; Stein, H. J.; Wagner, H. J.; Dittrich, A.; Pohlmann, D.
1982-08-01
A preliminary study was undertaken before a large scale project for construction and survey of about a hundred solar houses was launched. The notion of solar house was defined and the use of solar energy (hot water preparation, heating of rooms, heating of swimming pool, or a combination of these possibilities) were examined. A coherent measuring program was set up. Advantages and inconveniences of the large scale project were reviewed. Production of hot water, evaluation of different concepts and different fabrications of solar systems, coverage of the different systems, conservation of energy, failure frequency and failures statistics, durability of the installation, investment maintenance and energy costs were retained as study parameters. Different solar hot water production systems and the heat counter used for measurements are described.
Galvanising the NHS to Adopt Innovation
Parris, Stuart; Cochrane, Gavin; Marjanovic, Sonja; Ling, Tom; Chataway, Joanna
2016-01-01
Abstract The Department of Health and the Wellcome Trust, in co-operation with NHS England, asked RAND Europe to conduct a limited consultation with key stakeholders about the practicality of measures and incentives proposed as part of the NHS Accelerated Access Review (AAR), which aims to assess the pathways for the development, assessment, and adoption of innovative medicines and medical technology. Through a focused engagement exercise with key healthcare stakeholders this project explored the implications of selected interim AAR propositions and feasibility of implementation for key actors, in primary and secondary care as well as commissioners and academia. Specifically, the project investigated the feasibility of implementation of three specific propositions including: a new earmarked fund to encourage AHSNs and other key innovation actors to re-design systems to embrace innovation; mobilising the influence of clinical system leaders to champion change; and encouraging secondary care organisations to take on “innovation champion” roles linked to financial incentives and a new emphasis on accountable care organisations. Data was collected on the feasibility of the three AAR propositions from a workshop with AHSN CEOs and Commercial Directors and interviews with senior NHS staff in three AHSN regions (South West, University College London Partners, and North East, North Cumbria). The study concludes with reflections on the feasibility of each recommendation and identifies factors expected to facilitate or challenge their implementation, as well as considering the wider cross cutting issues that may influence the adoption and diffusion of innovation in the NHS. PMID:28083436
ERIC Educational Resources Information Center
Griva, Eleni; Semoglou, Klio
2012-01-01
This paper outlines the rationale for and the purpose of designing and implementing a project aiming to make very young EFL learners develop their language skills through their involvement in interactive psychomotor activities. The project, which is a part of a broader longitudinal project having introduced EFL in the first primary school grade,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geiger, J.; Lisell, L.; Mosey, G.
2013-10-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The study concerns the Provincial Electricity Authority, a state agency within the Ministry of Interior that supplies electricity to 73 of Thailand`s provinces. The primary objective of this study is to help increase the ability of the Authority to meet the rapidly increasing demand for electric power within the Kingdom of Thailand in a reliable, safe and economic manner. This is Volume 1 and it consists of the following: (1) introduction; (2) assessment; (3) conceptual design; (4) economic and financial evaluation; (5) project plan; (6) Thailand impact; (7) industry review; (8) conclusion; and appendices.
Bronx Zoo cogeneration project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivet, P.H.
The New York Zoological Society commenced feasibility studies for a proposed cogeneration and district heating system for the Bronz Zoo in spring 1982. Early studies focused on evaluating the Zoo's energy loads, infrastructure, and energy delivery and financing systems. The Zoological Society and New York City joined in the decision to support the construction of a system which would serve not only the Bronx Zoo but also five nearby City-funded installations, including the adjacent New York Botanical Garden. Since the submission of that study, the project has been modified in scope, scaling back to a generating capacity designed to servemore » only the Bronz Zoo.« less
Novel Concept for Flexible and Resilient Large Power Transformers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Upadhyay, Parag; Englebretson, Steven; Ramanan, V. R. R.
This feasibility study investigates a flexible and adaptable LPT design solution which can facilitate long-term replacement in the event of both catastrophic failures as well as scheduled replacements, thereby increasing grid resilience. The scope of this project has been defined based on an initial system study and identification of the transformer requirements from an overall system load flow perspective.
Insect-Based Vision for Autonomous Vehicles: A Feasibility Study
NASA Technical Reports Server (NTRS)
Srinivasan, Mandyam V.
1999-01-01
The aims of the project were to use a high-speed digital video camera to pursue two questions: i) To explore the influence of temporal imaging constraints on the performance of vision systems for autonomous mobile robots; To study the fine structure of insect flight trajectories with in order to better understand the characteristics of flight control, orientation and navigation.
Insect-Based Vision for Autonomous Vehicles: A Feasibility Study
NASA Technical Reports Server (NTRS)
Srinivasan, Mandyam V.
1999-01-01
The aims of the project were to use a high-speed digital video camera to pursue two questions: (1) To explore the influence of temporal imaging constraints on the performance of vision systems for autonomous mobile robots; (2) To study the fine structure of insect flight trajectories in order to better understand the characteristics of flight control, orientation and navigation.
GEMS Project: A Platform to Investigate Multiple Sclerosis Risk
Xia, Zongqi; White, Charles C.; Owen, Emily K.; Von Korff, Alina; Clarkson, Sarah R.; McCabe, Cristin A.; Cimpean, Maria; Winn, Phoebe A.; Hoesing, Ashley; Steele, Sonya U.; Cortese, Irene C. M.; Chitnis, Tanuja; Weiner, Howard L.; Reich, Daniel S.; Chibnik, Lori B.; De Jager, Philip L.
2015-01-01
The Genes and Environment in Multiple Sclerosis (GEMS) project establishes a platform to investigate the events leading to MS in at-risk individuals. It has recruited 2,632 first-degree relatives from across the USA. Using an integrated genetic and environmental risk score, we identified subjects with twice the MS risk when compared to the average family member, and we report an initial incidence rate in these subjects that is 30 times greater than that of sporadic MS. We discuss the feasibility of large-scale studies of asymptomatic at-risk subjects that leverage modern tools of subject recruitment to execute collaborative projects. PMID:26583565
7 CFR 762.146 - Other servicing procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... funds to be advanced are for authorized operating loan purposes; (ii) The financial benefit to the... refer to the original note. (5) The lender will inform the Agency of the rate change. (e) Consolidation... borrower must project a feasible plan after the consolidation. See § 762.102(b) for definition of feasible...
DOT National Transportation Integrated Search
2007-09-01
A Virtual Container Yard (VCY) is a mean of developing a shared resource information system to match empty equipment needs through the adoption of next generation internet and new technology information platforms. The project examines the feasibility...
Real options analysis for photovoltaic project under climate uncertainty
NASA Astrophysics Data System (ADS)
Kim, Kyeongseok; Kim, Sejong; Kim, Hyoungkwan
2016-08-01
The decision on photovoltaic project depends on the level of climate environments. Changes in temperature and insolation affect photovoltaic output. It is important for investors to consider future climate conditions for determining investments on photovoltaic projects. We propose a real options-based framework to assess economic feasibility of photovoltaic project under climate change. The framework supports investors to evaluate climate change impact on photovoltaic projects under future climate uncertainty.
Hidalgo-Mazzei, Diego; Mateu, Ainoa; Reinares, María; Undurraga, Juan; Bonnín, Caterina del Mar; Sánchez-Moreno, José; Vieta, Eduard; Colom, Francesc
2015-03-20
New technologies have recently been used for monitoring signs and symptoms of mental health illnesses and particularly have been tested to improve the outcomes in bipolar disorders. Web-based psychoeducational programs for bipolar disorders have also been implemented, yet to our knowledge, none of them have integrated both approaches in one single intervention. The aim of this project is to develop and validate a smartphone application to monitor symptoms and signs and empower the self-management of bipolar disorder, offering customized embedded psychoeducation contents, in order to identify early symptoms and prevent relapses and hospitalizations. The project will be carried out in three complementary phases, which will include a feasibility study (first phase), a qualitative study (second phase) and a randomized controlled trial (third phase) comparing the smartphone application (SIMPLe) on top of treatment as usual with treatment as usual alone. During the first phase, feasibility and satisfaction will be assessed with the application usage log data and with an electronic survey. Focus groups will be conducted and technical improvements will be incorporated at the second phase. Finally, at the third phase, survival analysis with multivariate data analysis will be performed and relationships between socio-demographic, clinical variables and assessments scores with relapses in each group will be explored. This project could result in a highly available, user-friendly and not costly monitoring and psychoeducational intervention that could improve the outcome of people suffering from bipolar disorders in a practical and secure way. Clinical Trials.gov: NCT02258711 (October 2014).
Lobdell, Danelle T.; Isakov, Vlad; Baxter, Lisa; Touma, Jawad S.; Smuts, Mary Beth; Özkaynak, Halûk
2011-01-01
Background New approaches to link health surveillance data with environmental and population exposure information are needed to examine the health benefits of risk management decisions. Objective We examined the feasibility of conducting a local assessment of the public health impacts of cumulative air pollution reduction activities from federal, state, local, and voluntary actions in the City of New Haven, Connecticut (USA). Methods Using a hybrid modeling approach that combines regional and local-scale air quality data, we estimated ambient concentrations for multiple air pollutants [e.g., PM2.5 (particulate matter ≤ 2.5 μm in aerodynamic diameter), NOx (nitrogen oxides)] for baseline year 2001 and projected emissions for 2010, 2020, and 2030. We assessed the feasibility of detecting health improvements in relation to reductions in air pollution for 26 different pollutant–health outcome linkages using both sample size and exploratory epidemiological simulations to further inform decision-making needs. Results Model projections suggested decreases (~ 10–60%) in pollutant concentrations, mainly attributable to decreases in pollutants from local sources between 2001 and 2010. Models indicated considerable spatial variability in the concentrations of most pollutants. Sample size analyses supported the feasibility of identifying linkages between reductions in NOx and improvements in all-cause mortality, prevalence of asthma in children and adults, and cardiovascular and respiratory hospitalizations. Conclusion Substantial reductions in air pollution (e.g., ~ 60% for NOx) are needed to detect health impacts of environmental actions using traditional epidemiological study designs in small communities like New Haven. In contrast, exploratory epidemiological simulations suggest that it may be possible to demonstrate the health impacts of PM reductions by predicting intraurban pollution gradients within New Haven using coupled models. PMID:21335318
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... economic viability and growth of the Southern Tier and other affected areas of New York. Alternatives under... the project and is considered feasible based on engineering, cost, and social, economic, and...
Acousto-optic laser projection systems for displaying TV information
NASA Astrophysics Data System (ADS)
Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.
2015-04-01
This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.
NASA Astrophysics Data System (ADS)
Getty, Morgan
Due to their limited resources, rural, older adults in the United States are at risk for poor diet-related health outcomes. Nutrition education is a key component in improving health outcomes in older adults. Cooking Healthy, Eating Smart (CHES) is a nine-lesson curriculum designed to teach rural, older adults culturally appropriate nutrition and food safety information. Funding to hire health professionals to deliver such a curriculum is limited, presenting the need to explore a less expensive mode of dissemination. In this community-based, participatory research study, a formative evaluation and feasibility study were conducted to examine the use of volunteers to deliver a nutrition and food safety curriculum to rural, older adults in South Carolina. Seven focus groups were conducted with members of the South Carolina Family and Community Leaders (SCFCL) and members of the American Association of Retired Persons (AARP) in the four regions of South Carolina to explore barriers and facilitators of volunteers delivering CHES (N=65 participants). The focus group findings informed the development of the volunteer training manual. A comparative case study method was used to examine the feasibility of a volunteer-based approach by observing and describing the delivery of CHES by two groups of volunteers in SC. The case study findings, including volunteer knowledge change, self-efficacy change, curriculum experience, program experience, and project team observations of volunteers indicated that using volunteers to deliver CHES is a plausible approach with the assistance of paid staff or project team members.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... the treatment for project participants and, where feasible, for a comparison group of non... in the project (control group). The effect of the project is the average difference in outcomes between the treatment and control groups. Integrating means (i) encouraging the use of high-quality arts...
Great Basin Native Plant Project: 2014 Progress Report
Francis Kilkenny; Anne Halford; Alexis Malcomb
2015-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead by the...
Great Basin Native Plant Project: 2013 Progress Report
Francis Kilkenny; Nancy Shaw; Corey Gucker
2014-01-01
The Interagency Native Plant Materials Development Program outlined in the 2002 United States Department of Agriculture (USDA) and United States Department of Interior (USDI) Report to Congress encouraged use of native plant materials for rangeland rehabilitation and restoration where feasible. The Great Basin Native Plant Project is a cooperative project lead by the...
NASA Astrophysics Data System (ADS)
Amon, D. M.
Progress is reviewed in a project to test the economic feasibility of wind turbine technology for generating electricity. The use of wind generating electricity on a commercial fruit farm interconnecting a commercial fruit farm with a major utility to sell power are the find project goals.
PROACT user's guide: how to use the pallet recovery opportunity analysis computer tool
E. Bradley Hager; A.L. Hammett; Philip A. Araman
2003-01-01
Pallet recovery projects are environmentally responsible and offer promising business opportunities. The Pallet Recovery Opportunity Analysis Computer Tool (PROACT) assesses the operational and financial feasibility of potential pallet recovery projects. The use of project specific information supplied by the user increases the accuracy and the validity of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2010. On November 22, 2010, Pennamaquan Tidal... Act (FPA), proposing to study the feasibility of the Pennamaquan Tidal Power Plant Project to be...