Science.gov

Sample records for federal hydroelectric facilities

  1. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1995 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Graves, Richie J.; Langeslay, Michael J.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams.

  2. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2000 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean

    2001-05-01

    2000 was the third season in the Smolt Monitoring Facility (SMF) at John Day Dam. Despite the continued presence of the NMFS The Dalles Dam spillway survival study, and a higher target number of study fish, sample numbers were down form 1999. Additionally, the average sample rate this year (25%) was nearly twice the average rate in 1999, (13%). Spill, expressed as a percent of river flow, was up slightly this year, about 3% in the spring and 8% through the summer and fall, which accounts for some of the decline in sample numbers. The largest declines in sample numbers were for yearling and subyearling chinook and wild sockeye. Descaling and mortality rates were very low for all species, the highest descaling was 11.2% for hatchery sockeye. River flow was lower than last year, debris was light, dissolved gas levels were generally below the Oregon and Washington water quality standards, and overall, migration conditions were good. Passage duration was generally similar to last year but timing varied considerably, depending on species. PIT tag detections were down to 41,848 from 138,705 the previous year. Increased spill passage is the likely explanation for the large decline. The Separation by Code component of the system was utilized by three different studies. At Bonneville Dam, index level sampling was transferred from the first powerhouse to the second powerhouse and occurred at the new Hamilton Island Juvenile Monitoring Facility. An estimated 2.7 million fish passed through the bypass system, 54,051 of which were sampled in the new facility. The location and method differ so much from previous years that comparisons are pointless. River conditions were similar to those described for John Day Dam; lower than in 1999, moderate debris, manageable gas levels, and normal temperatures. Passage timing and duration was very similar to last year for the chinook and steelhead but the coho migration started later and ended earlier, and sockeye were just the opposite

  3. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2003 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2004-02-01

    The 2003 spring flows were within 7 kcfs of last year's flows, but the summer flows were significantly lower, averaging 194 kcfs compared to 278 kcfs last year. Late summer and fall flows were within 20 kcfs of last year's flows. These flow levels provided good migration conditions for juvenile salmonids, comparable to last year, except in June and July. Monthly average river flows were lower than the historical averages. The number of fish handled at John Day decreased from 257,741 last year to 166,209 this year. Part of this decline is due to reduced research effort which lowers the total number of fish needed. Descaling, compared to last year, varied by species, increasing for yearling chinook and clipped and unclipped steelhead, decreasing for coho and sockeye, and remaining about the same for subyearling chinook. Descaling was well below the average for the airlift years for all species except unclipped steelhead. This may be a function of unclipped hatchery steelhead being counted as unclipped steelhead, a category traditionally reserved for wild steelhead. Mortality continues to be low, at or below last year's levels for yearling chinook, subyearling chinook, clipped steelhead and sockeye; slightly higher than last year for unclipped steelhead and coho. With the exception of sockeye, mortality rates at the new facility are well below the average for the years of sampling with the airlift system. The spring migrants generally started migrating later and finished earlier, for a shorter overall duration. Sub-yearling chinook did just the opposite, starting earlier and ending later for a longer middle 80% duration. This was the fourth year of index level sampling at the Hamilton Island Juvenile Monitoring Facility at Bonneville. The number of fish handled declined from 85,552 last year to 80,303 this year. Descaling for all species was similar to the previous two years (within 2%) but in all cases lower than the historical average. Mortality was lower than last

  4. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2004-2005 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2005-02-02

    yearling Chinook and unclipped steelhead runs took longer to pass Bonneville than any previous year, at 44 and 45 days, respectively. For subyearling Chinook, the middle 80% of the fish passed during the last three weeks of June and the first week of July, taking 35 days to pass the project, the same as last year. Descaling for all species was slightly higher than the average of the last five years. Compared to last year, descaling varied by species, increasing for yearling Chinook, coho, and sockeye and lower for subyearling Chinook and steelhead. Since sampling began in the juvenile monitoring facility, descaling has been quite consistent, staying below 3.6% for yearling and subyearling Chinook, unclipped steelhead and coho, and above 4.7% for clipped steelhead and sockeye. Mortality was slightly higher than last year and the historical average for yearling and subyearling Chinook and steelhead. Coho and sockeye mortality was lower than last year and the historical average. Mortality for all species was below 1%. Powerhouse 2 operational priority and research results showing higher survival of fish passing through the PH1 turbines rather than through the bypass system resulted in a complete disuse of the PH1 bypass system. Consequently, we removed the historic PH1 data from this report and refer readers to any prior report for information regarding first powerhouse fish sampling.

  5. Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.

    SciTech Connect

    Noyes, J.H.

    1986-02-01

    Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

  6. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  7. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    SciTech Connect

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  8. 11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT WITH INTAKE TRASH RACK AT WATER LINE AND SWITCH GEAR ON TOP - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  9. 3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  10. 2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  11. 1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  12. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209 Section 292.209 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS...

  13. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209 Section 292.209 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS...

  14. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER...

  15. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209 Section 292.209 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS...

  16. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER...

  17. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section 292.208 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER...

  18. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect

    Auer, N.A.

    1996-01-01

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  19. Small-scale hydroelectric demonstration project: Reactivation of the Elk Rapids Hydroelectric Facility: Final operation and maintenance report

    SciTech Connect

    Miller, R.G.

    1987-03-01

    Information related to the reactivation of the Elk River Hydroelectric Power facility is reported. This report includes a history of the power plant, pertinent cost data, emergency action plans, inspections and testing, warranty work, operating problems, project data, monthly production data, and monthly operating and maintenance costs. 15 figs., 3 tabs.

  20. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    SciTech Connect

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  1. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A... means of a new dam or diversion (as that term is defined in § 292.202(p)) is a qualifying facility...

  2. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A... means of a new dam or diversion (as that term is defined in § 292.202(p)) is a qualifying facility...

  3. Hydroelectric facility in Montana. Introduced in the Senate of the United States, One Hundred Fourth Congress, First Session, July 11, 1995

    SciTech Connect

    1995-12-31

    The report addresses S. 552 a bill to allow the refurbishent and continued operation of a small hydroelectric power plant in central Montana by adjusting the amount of charges to be paid to the United States under the Federal Power Act. The Flint Creek Project, Federal Energy Regulatory Commission (FERC) project number 1473, was completed in 1900. In 1988, Montana Power allowed its original license to expire due to the licensing costs and the cost to refurbish the facilities.

  4. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  5. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  6. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... Energy Regulatory Commission Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice... No.: 2790-055. c. Date Filed: July 6, 2010. d. Applicant: Boott Hydropower, Inc. and Eldred L Field... Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681-1900 Ext 809. i. FERC...

  7. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  8. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  9. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for Transfer of License, and Soliciting Comments...

  10. Federal Facility Agreement progress report

    SciTech Connect

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  11. 40 CFR 35.2127 - Federal facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Federal facilities. 35.2127 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2127 Federal facilities... day or 5 percent of the design flow of the complete waste treatment system, whichever is...

  12. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  13. Federal Spending on PK-12 School Facilities

    ERIC Educational Resources Information Center

    Filardo, Mary; O'Donnell, Sean

    2010-01-01

    Methodology: There is no national source of data or information on the federal role in funding and oversight for public PK-12 school facilities. To address this shortcoming, 21st Century School Fund has prepared this study with the support of the National Clearinghouse for Educational Facilities. In collecting data and information for this report,…

  14. Federal facility compliance: Strategies, policies and management

    SciTech Connect

    1999-07-01

    Federal Facility Compliance reviews developments in environmental legislative/regulatory analysis, climate change, and environmental management practices at the US Postal Service. It also covers the management of ozone-depleting chemicals at US Army Reserve facilities, Title 5, and wastewater system assessments at military installations.

  15. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  16. A simplified method for determining fishery impacts at hydroelectric facilities where flow regulation is possible

    SciTech Connect

    Spear, P.W.; Currier, R.A.

    1983-12-01

    This paper describes a simple technique for evaluating the potential fishery impacts of minimum flow releases at existing or proposed hydroelectric facilities where water outflows of the dam can be regulated. Transect locations are chosen to show all types of representative fishery habitat (slow, fast pools and riffles, undercut banks, shaded areas, etc.). Temporary transects are laid out with stakes. Water flows are selected in the vicinity of the 7Q10, Median August and A.B.F. flows, the minimum operating level of the turbine(s), and other appropriate amounts. A minimum discharge is then imposed on the river by modifying the release at the dam. Water depths and velocities are then measured at about 1-2 foot intervals along the transect. Stream width is also measured. This process is repeated at all flows to be evaluated. These velocities, wetted perimeters, and depths are then graphed and compared to published values of known habitat criteria for the key species. Spawning, nursery, and adult cover depths and speeds are then compared to the known depths and speeds at the various potential minimum discharges. Incompatabilities, if any, are then evaluated. The technique is a quick and relatively simple method of determining fishery impacts at hydro sites that are scheduled for retrofitting or re-actuation.

  17. 25 CFR 31.2 - Use of Federal school facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Use of Federal school facilities. 31.2 Section 31.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION FEDERAL SCHOOLS FOR INDIANS § 31.2 Use of Federal school facilities. Federal Indian school facilities may be used for...

  18. Federal facilities report toxics use under EPCRA

    SciTech Connect

    Bergeson, L.L.

    1993-10-01

    President Clinton's Aug. 3, 1993, executive order requires federal agencies to disclose toxic chemical use and release data under Section 313 of the Emergency Planning and Community Right-to-Know Act (EPCRA) and to develop pollution prevention strategies to achieve targeted chemical reduction goals. Section 313 of EPCRA requires manufacturers in Standard Industrial Classification (SIC) codes 20--39 with more than 10 employees to report annually by July 1, 1994, release of listed toxic substances to all environmental media during the previous year. GOCOs that meet these requirements already report Toxics Release Inventory (TRI) data. But non-manufacturing GOCOs and federal facilities not included in SIC codes 20--39 had been exempt from the reporting requirement. The August 3 order does not come as a complete surprise. Last April, President Clinton made several revealing announcements during his Earth Day Address. Perhaps his most salient announcement was his decision to issue an executive order requiring the federal government to become the leader in applying pollution prevention to its daily operations, purchasing decisions and policies, and in reducing toxic releases.

  19. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  20. Federal facilities compliance act waste management

    SciTech Connect

    Bowers, J; Gates-Anderson, D; Hollister, R; Painter, S

    1999-07-06

    Site Treatment Plans (STPs) developed through the Federal Facilities Compliance Act pose many technical and administrative challenges. Legacy wastes managed under these plans require Land Disposal Restriction (LDR) compliance through treatment and ultimate disposal. Although capacity has been defined for most of the Department of Energy wastes, many waste streams require further characterization and many need additional treatment and handling beyond LDR criteria to be able to dispose of the waste. At Lawrence Livermore National Laboratory (LLNL), the Hazardous Waste Management Division has developed a comprehensive Legacy Waste Program. The program directs work to manage low level and mixed wastes to ensure compliance with nuclear facility rules and its STP. This paper provides a survey of work conducted on these wastes at LLNL. They include commercial waste treatment and disposal, diverse forms of characterization, inventory maintenance and reporting, on-site treatment, and treatability studies. These activities are conducted in an integrated fashion to meet schedules defined in the STP. The processes managing wastes are dynamic due to required integration of administrative, regulatory, and technical concerns spanning the gamut to insure safe proper disposal.

  1. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Federal control of port facilities. Sec. 3 Section 3... RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec. 3 Federal control of port facilities. During any period when the provisions of this part are in effect...

  2. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each...

  3. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each...

  4. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each...

  5. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each...

  6. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each...

  7. Behavior and passage of silver-phase American eels, Anguilla rostrata (LeSueur), at a small hydroelectric facility

    USGS Publications Warehouse

    Haro, Alex; Castro-Santos, Ted; Boubée, Jacques

    2000-01-01

    Downstream migrant eels were monitored near a small (51 MW) hydroelectric facility on the Connecticut River (Massachusetts, USA) for two seasons using acoustic and radio telemetry. Eels frequently made several attempts over periods of one to several days to pass the station. Did activity of eels was variable, although most movements occurred at night. Eels occupied a variety of depths in the forebay area, but spent the greater proportion of time at or near the bottom (10 m), occasionally venturing to the surface. Horizontal movements usually spanned across the entire width of the forebay. There was no significant relationship between duration of forebay presence and either flow or light intensity. Although all telemetered eels passed via the turbines, some migrant eels did use a surface bypass.

  8. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  9. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  10. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric...

  11. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.180 What... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What illumination...

  12. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.180 What... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What illumination...

  13. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.180 What... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What illumination...

  14. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.180 What... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What illumination...

  15. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.180 What... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What illumination...

  16. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for...: Jordan Hydroelectric Limited Partnership e. Name of Project: Flannagan Hydroelectric Project f....

  17. Radioactive contamination at federally owned facilities. Final report

    SciTech Connect

    Bernhardt, D.E.; Macbeth, P.J.; Sutherland, A.A.; Grant, M.W.; Sandquist, G.M.

    1982-06-01

    Federally-controlled facilities that are contaminated with radioactivity are listed and described. Estimates of current levels of contamination are provided and decontamination and decommissioning (DandD) procedures are discussed. All of this information has been gathered from available literature and personal contacts with individuals; no new measurements or site visits were made. Finally, estimates of amounts and activities of low-level and transuranic wastes that can be generated from DandD of federally controlled facilities are provided.

  18. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  19. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec....

  20. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec....

  1. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec....

  2. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec....

  3. 36 CFR 1253.8 - Are NARA research room facilities closed on Federal holidays?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facilities closed on Federal holidays? 1253.8 Section 1253.8 Parks, Forests, and Public Property NATIONAL....8 Are NARA research room facilities closed on Federal holidays? NARA research room facilities are closed on all Federal holidays....

  4. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1991 Annual Report.

    SciTech Connect

    Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.

  5. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1993 Annual Report.

    SciTech Connect

    Wood, Lynette A.; Graves, Ritchie J.; Killins, Susan D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis.

  6. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1988 Annual Report.

    SciTech Connect

    Johnsen, Richard C.

    1988-12-01

    The 1988 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at Lower Granite, Mcnary, John Day, and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to the FPDIS for use by FPC in developing fish passage indices and migration timing, and for water budget and spill management. 13 refs., 100 figs.

  7. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1996 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Graves, Ritchie J.

    1997-08-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1996 The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville Dams. Monitoring data collected included: river conditions; total numbers of fish; numbers of fry, adult salmon, and incidental catch; daily and seasonal passage patterns; and fish condition. 10 refs., 16 figs., 5 tabs.

  8. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1997 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Mills, Robert B.

    1998-06-01

    All juvenile fish numbers, sample, collection, and index were down almost 50% from the previous year at John Day Dam (JDA). At Bonneville Dam, sample numbers increased while collection and index numbers stayed about the same. The following report presents results from the 1997 smolt monitoring at John Day and Bonneville dams and represents the fourteenth annual report under this project. The report also contains summaries of data for all years of the program at John Day and Bonneville dams in Appendices C and D.

  9. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1998 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    1999-03-01

    Project 84-014 has been part of the annual integrated and coordinated Columbia River Basin Smolt Monitoring Program since 1984, and currently addresses measure 5.9A.1 of the 1994 Northwest Power Planning Council's (NPPC) Fish and Wildlife Program. This report presents results from the 1998 smolt monitoring at John Day and Bonneville dams and represents the fifteenth annual report under this project.

  10. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2005-2006 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean

    2006-04-01

    2005 was an average to below average flow year at John Day and Bonneville Dams. A large increase in flow in May improved migration conditions for that peak passage month. Spill was provided April through August and averaged about 30% and 48% of river flow at John Day and Bonneville Dams, respectively. Water temperature graphs were added this year that show slightly lower than average water temperature at John Day and slightly higher than average temperatures at Bonneville. The number of fish handled at John Day decreased from 412,797 in 2004 to 195,293 this year. Of the 195,293 fish, 120,586 (61.7%) were collected for researchers. Last year, 356,237 (86.3%) of the fish sampled were for researchers. This dramatic decline is the result of (1) fewer research fish needed (2) a smaller, lighter tag which allowed for tagging of smaller fish, and (3) a larger average size for subyearling chinook. These factors combined to reduce the average sample rate to 10.8%, about half of last year's rate of 18.5%. Passage timing at John Day was similar to previous years, but the pattern was distinguished by larger than average passage peaks for spring migrants, especially sockeye. The large spike in mid May for sockeye created a very short middle 80% passage duration of just 16 days. Other spring migrants also benefited from the large increase in flow in May. Descaling was lower than last year for all species except subyearling chinook and below the historical average for all species. Conversely, the incidence of about 90% of the other condition factors increased. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, less than 1% for all species. On 6 April a slide gate was left closed at John Day and 718 fish were killed. A gate position indicator light was installed to prevent reoccurrences. Also added this year was a PIT tag detector on the adult return-to-river flume. For the first time this year, we successfully held Pacific lamprey ammocetes. The number of fish sampled at Bonneville Dam was also down this year to 260,742, from 444,580 last year. Reasons for the decline are the same as stated above for John Day. Passage timing at Bonneville Dam was quite similar to previous years with one notable exception, sockeye. Sockeye passage was dominated by two large spikes in late May that greatly condensed the passage pattern, with the middle 80% passing Bonneville in just 18 days. Unlike John Day, passage for the rest of the species was well disbursed from late April through early June. Fish condition was good, with reductions in descaling rates for all species except unclipped steelhead and sockeye. Sockeye mortality matched last year's rate but was considerably lower for all other species. Rare species sampled at Bonneville this year included a bull trout and a eulachon.

  11. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2002 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Ballinger, Dean; Kamps, Jeffrey W.

    2003-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River. The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to monitor the timing and magnitude of the juvenile salmonid out-migration in the Columbia Basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time and survival estimates and to build a time series data set for future reference. The purpose of the PSMFC portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville dams.

  12. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2001 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Ballinger, Dean; Kovalchuk, Gregory M.

    2002-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration.

  13. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1990 Annual Report.

    SciTech Connect

    Hawkes, Lynette A.

    1991-03-01

    The seaward migration of salmonid smolts was monitored by the National Marine Fisheries Service (NMFS) at three sites on the Columbia River system in 1990. This project is a part of the continuing Smolt Monitoring Program to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Indian Tribes. It's purpose is to provide timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis for travel time, relative magnitude and timing and the smolt migration. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the Smolt Monitoring program, and the Dallas Dam under the Fish Spill Memorandum of Agreement'' for 1990. All pertinent fish capture, condition and brand data, as well as dam operations and river flow data were reported daily to FPC. These data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 10 refs., 8 figs., 1 tab.

  14. Bailey Creek Ranch Hydroelectric Project: a grease under the fingernails description of small hydroelectric development

    SciTech Connect

    O'Rourke, T.L.

    1982-06-01

    This project consists of a 670 kilowatt hydroelectric power generating facility built under an exemption from license requirements issued by the Federal energy Regulatory Commission (FERC). It is located on a sixty acre parcel of ranch land on the western side of the Sierra Nevada Mountains in Shasta County, California. The project will provide electric power to be sold under a thirty year term contract into the electric grid system of Pacific Gas and Electric, Inc. (PG and E). Peak output will be approximately 750 kilowatts. Depending on the amount of rainfall, on an averaged annual basis, it will produce between 3,800,000 kilowatt hours and 4,200,000 kilowatt hours. This may be the first all new hydroelectric site to come on line in the United states in response to the Congressional enactment of the National Energy Plan and the Energy Security Act. Under these laws, private unregulated hydroelectric power producers were relieved of the rigid licensing requirements of the Federal Power Act and the national electric power market was opened to non-utility competition. The Bailey Creek Ranch Hydroelectric Project was 100% privately financed with no government grants or loans.

  15. Advances in technology transfer at Federal Facilities

    SciTech Connect

    Silva, R.R. Jr.

    1994-11-01

    The Hanford Site, located in the southeast portion of the state of Washington, is a 1450-hectare (560 square miles) reservation that was selected by the US Government in 1942 for production of the world`s first nuclear weapons materials. For more than 40 years, defense production operations at Hanford generated hazardous and radioactive materials and wastes that for the most part remain there today. Environmental restoration of the Hanford Site is the primary mission of the Westinghouse Hanford Company (WHC) and it is also the thrust of the Tri-Party agreement among the US Environmental Protection Agency, the Washington State Department of Ecology and the US Department of Energy. Restoration will require treatment of about 1400 individual locations that are contaminated by chemically hazardous wastes, radioactive wastes, non-hazardous wastes and mixed hazardous and radioactive wastes. These locations include burial sites, storage facilities, obsolete buildings, settling ponds, waste cribs and large and small areas of near-surface and deep soil contamination. Burial trenches contain an estimated 109,000 cubic meters of low-level solid wastes contaminated with hazardous chemicals and radioactive materials. Approximately 450 sites were contaminated by discharge of liquids to the ground and there are about 250 additional areas where waste materials were spilled. At one time, ditches carried water from processing plants to settling/cooling ponds and 131 cribs were used over the years to dispose of slightly radioactive liquid wastes.

  16. Federal Agency Liability under the Superfund Act: It Goes Beyond Federal Facilities

    SciTech Connect

    Raymond Takashi Swenson

    2004-02-01

    While many readers of the Federal Facilities Environmental Journal are involved with the performance of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup on Department of Defense and Department of Energy facilities, many may be unfamiliar with the much broader CERCLA liability of federal agencies under other circumstances. This article places the various kinds of federal agency CERCLA liability into that wider context and serves as a lessons learned for environmental managers who want to avoid creating new CERCLA liability for their agencies.

  17. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  18. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  19. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  20. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  1. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  2. Yellow book: Guide to environmental enforcement and compliance at federal facilities

    SciTech Connect

    Not Available

    1999-02-01

    The Yellow Book's primary purpose is to provide individuals with Federal facility environmental responsibilities with an informational tool to help comply with environmental requirements and to clearly explain the compliance and enforcement processes used by EPA and States at Federal facilities. Topics covered in the Yellow Book include: Identifying Federal Facilities and Tracking Federal Facility Compliance; Environmental Statutes and Executive Orders; Crosscutting Environmental Issues; Monitoring Federal Facility Compliance; Enforcement Response to Federal Facility Violations; Compliance Assistance, Training, and Outreach; and EPA Offices With Major Federal Facility Responsibilities.

  3. Methods for Valuation of Environmental Costs and Benefits of Hydroelectric Facilities : A Case Study of the Sultan River Project : Final Report.

    SciTech Connect

    BioSystems Analysis, Inc.

    1984-06-05

    The Bonneville Power Administration is required by the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501) to include quantifiable environmental costs and benefits of alternative electric power resources in determining their cost-effectiveness. In responding to this requirement, BPA has contracted to develop and test methodologies for valuing environmental costs of various types of power resources, including hydroelectric facilities. The purpose of this study is to develop and test valuation methods for hydroelectric facilities, using the Sultan River Project as a case study. The case study approach offers several advantages and some disadvantages which should be considered in interpreting this report. Its primary advantage lies in providing a real-world example against which to test theoretical valuation approaches. Using data that were actually collected for a project that has received detailed scrutiny from its sponsor and from numerous regulatory agencies allows more realistic formulation of valuation issues and also provides a better test of the practicality and usefulness of valuation methods. On the other hand, results derived from such an approach must be used with discretion. First and most obvious, both the features of a hydroproject and its environmental impacts may vary widely from site to site. Second, it cannot be assumed that the results of these test exercises for the Sultan River Project represent any kind of generic hydroelectric environmental cost. A third caution is directed to those who may be tempted to regard this report as a definitive estimate of the environmental costs of the Sultan River Project. It is not. A fourth important point is only external or residual environmental costs are developed in this report. Finally, it should be noted that these methodologies were developed to meet the needs of BPA's process for determining resource cost-effectiveness.

  4. PROCESS AND EQUIPMENT CHANGES FOR CLEANER PRODUCTION IN FEDERAL FACILITIES

    EPA Science Inventory

    The paper discusses process and equipment changes for cleaner production in federal facilities. During the 1990s, DoD and EPA conducted joint research and development, aimed at reducing the discharge of hazardous and toxic pollutants from military production and maintenance faci...

  5. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  6. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  7. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  8. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  9. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  10. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    SciTech Connect

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  11. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of...-conditioning during non-working hours, except as necessary to return space temperatures to a suitable level...

  12. The munitions provisions of the Federal Facility Compliance Act

    SciTech Connect

    Kimmell, T.A.; Green, D.R.; Queen, R.

    1994-03-01

    The Federal Facility Compliance Act (FFCA) was signed by President Bush on October 6, 1992. This Act amends the Resource Conservation and Recovery Act (RCRA), the primary law governing hazardous waste management in the US The most significant provision of the FFCA was the waiver of sovereign immunity. This waiver subjects Federal facilities to the same ``incentives`` as the private sector for compliance. While the waiver has broad implications for all Federal facilities, other provisions of the FFCA impact specific sectors of the Federal complex. The focus of this paper is the FFCA Munitions Provisions, which have the potential to change some aspects of the structure of munitions management within the military. The Munitions Provisions, contained in Section 107 of the FFCA, modifies Section 3004 of RCRA by adding a new subsection (y) on Munitions. Section 107 requires the Environmental Protection Agency (EPA) to develop, after consultation with the Department of Defense (DOD) and appropriate State officials, regulations identifying when military munitions (including conventional and chemical munitions) become hazardous waste, and to provide for the safe transportation and storage of such waste. The FFCA requires EPA to promulgate the final ``Munitions Rule`` by October 6, 1994. These are the only provisions of the FFCA that require a new rulemaking. It is clear that the Munitions Rule could have a significant effect on the way in which DOD manages munitions. Demilitarization, range management, training activities, and emergency response actions may be affected. It is important for DOD, the Services, and individual installations, to be aware of potential impacts of the FFCA on munitions management operations. The purpose of this paper is to review several important munitions Rule issues, and to discuss potential impacts of these issues.

  13. Overview of hazardous-waste regulation at federal facilities

    SciTech Connect

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require.

  14. Environmental safety & health requirements for a federal facility

    SciTech Connect

    Campbell, G.; Wong, J.

    1995-09-01

    I would like to take this opportunity to discuss the challenges that face an environmental, safety, and health (ES&H) manager at a federal facility situated in California. The challenges are, in many aspects, similar to those facing ES&H professionals all over this country: dwindling resources and increasing regulatory demands. The Laboratory (LLNL) is under closer scrutiny than other R&D facilities located in California because some of its research activities involve nuclear weapon design. Today I would like to talk about two actions we, the ES&H management at LLNL, have taken to decrease the impact of dwindling resources and increasing regulatory demands: (1) Institution of a performance-based contract, which the University of California negotiated with the Department of Energy (DOE) to reduce the impact of special mandates required of federal facilities. Under this contract, ES&H performance is measured by results rather than by process; (2) Redesign of the LLNL Hazards Control Department to a flat organization that incorporates employee empowerment and Self-Managed Work Teams (SMWTs).

  15. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of..., Wilkesboro Hydroelectric Company, LLC (transferor) and Wilkesboro Hydropower, LLC (transferee) filed...

  16. 78 FR 25434 - Henwood Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Henwood Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of... Hydroelectric Company informed the Commission that the exemption from licensing for the Salmon...

  17. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project....

  18. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What heating and cooling... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of the building systems, Federal agencies must— (a) Operate heating and cooling systems in the...

  19. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What heating and cooling... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of the building systems, Federal agencies must— (a) Operate heating and cooling systems in the...

  20. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What heating and cooling... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of the building systems, Federal agencies must— (a) Operate heating and cooling systems in the...

  1. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What heating and cooling... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of the building systems, Federal agencies must— (a) Operate heating and cooling systems in the...

  2. Expanding public involvement in the restoration of federal facilities

    SciTech Connect

    Johnson, A.W.; Rouse, N.V.; Lawley, S.B.

    1994-12-31

    In February of 1994, the Navy released a guidance document entitled Establishment of Restoration Advisory Boards. This guidance recommends that all Navy facilities with practicing Technical Review Committees (TRCs) transition these committees into Restoration Advisory Boards, or RABS. Subsequently, the US Environmental Protection Agency (EPA), in concert with the Department of Defense (DOD), issued similar draft guidance that also strongly recommends this transition to RABs be accomplished. The intent of creating RABs is to increase community participation in the federal facility environmental restoration process. The RAB`s mission is to provide an avenue for early, two-way communication between the affected community and the environmental decision makers. The Navy strongly believes that implementing RABs will accelerate cleanups by ensuring that the affected communities have a voice early in the restoration process. The Navy is implementing this guidance at a number of Navy facilities, including bases that have been targeted for closure. This paper discusses DOD and Navy policy and joint EPA and DOD guidelines for implementing RABs, techniques to recruit additional community members, the process for selecting RAB members, orientation of RAB members, and RAB operational considerations. It also provides insight into what the Navy has learned by establishing RABs.

  3. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Facility Ridesharing Program” (3 CFR, 1980 Comp., p. 138), Executive agencies must actively promote the use...-occupancy modes of travel) by personnel working at Federal facilities to conserve energy, reduce congestion... accordance with the Federal Employees Clean Air Incentives Act (Public Law 103-172), the Federal...

  4. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Exemption to qualifying facilities from the Federal Power Act. 292.601 Section 292.601 Conservation of Power and Water Resources... Production Facilities and Cogeneration Facilities from Certain Federal and State Laws and Regulations §...

  5. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations with facility-wide emission budgets. 93.161 Section 93.161 Protection of Environment ENVIRONMENTAL... Implementation Plans § 93.161 Conformity evaluation for Federal installations with facility-wide emission budgets... installations subject to Federal oversight develop and adopt a facility-wide emission budget to be used...

  6. The Influence of Tag Presence on the Mortality of Juvenile Chinook Salmon Exposed to Simulated Hydroturbine Passage: Implications for Survival Estimates and Management of Hydroelectric Facilities

    SciTech Connect

    Carlson, Thomas J.; Brown, Richard S.; Stephenson, John R.; Pflugrath, Brett D.; Colotelo, Alison HA; Gingerich, Andrew J.; Benjamin, Piper L.; Langeslay, Mike; Ahmann, Martin L.; Johnson, Robert L.; Skalski, John R.; Seaburg, Adam; Townsend, Richard L.

    2012-05-01

    Each year, millions of fish have telemetry tags (acoustic, radio, inductive) surgically implanted to assess their passage and survival through hydropower facilities. One route of passage of particular concern is through hydro turbines, in which fish may be exposed to a range of potential injuries, including barotraumas from rapid decompression. The change in pressure from acclimation to exposure (nadir) has been found to be an important factor in predicting the likelihood of mortality and injury for juvenile Chinook salmon undergoing rapid decompression associated with simulated turbine passage. The presence of telemetry tags has also been shown to influence the likelihood of injury and mortality for juvenile Chinook salmon. This research investigated the likelihood of mortality and injury for juvenile Chinook salmon carrying telemetry tags and exposed to a range of simulated turbine passage. Several factors were examined as predictors of mortal injury for fish undergoing rapid decompression, and the ratio of pressure change and tag burden were determined to be the most predictive factors. As the ratio of pressure change and tag burden increase, the likelihood of mortal injury also increases. The results of this study suggest that previous survival estimates of juvenile Chinook salmon passing through hydro turbines may have been biased due to the presence of telemetry tags, and this has direct implications to the management of hydroelectric facilities. Realistic examples indicate how the bias in turbine passage survival estimates could be 20% or higher, depending on the mass of the implanted tags and the ratio of acclimation to exposure pressures. Bias would increase as the tag burden and pressure ratio increase, and have direct implications on survival estimates. It is recommended that future survival studies use the smallest telemetry tags possible to minimize the potential bias that may be associated with carrying the tag.

  7. 75 FR 65366 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Mountain Dam Salt River AZ 85215 Landholding Agency: Interior Property Number: 61201040004 Status... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for...

  8. An overview of filtration methods that can provide protection from the macrofouling zebra mussel at hydroelectric facilities

    SciTech Connect

    Smythe, A.G.; Short, T.M.

    1995-12-31

    The non-indigenous freshwater zebra and quagga mussels (Dreissena, spp.) threaten to foul freshwater conduits throughout much of the United States and southern Canada. Initially, many electric facilities within the lower Great Lakes drainage were fouled. More recently, other systems both in and out of the Great Lakes, have been exposed to infested water facilitated by canals and boat traffic and impacted by the mussels. Mussels have clogged conduits and fouled equipment and monitoring sensors in relatively distant regions including the Hudson River, the Mississippi River south to New Orleans, and the Arkansas River into Oklahoma. Chemicals can effectively control the mussels, however, filtration methods promise to be a relatively cost effective, environmentally safe alternative control approach. Information on traditional filtration methods will be presented in this paper along with recent research results for in-line filters.

  9. The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities

    SciTech Connect

    Colotelo, Alison HA; Pflugrath, Brett D.; Brown, Richard S.; Brauner, Colin J.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiqun; Ahmann, Martin L.; Trumbo, Bradly A.

    2012-10-01

    Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

  10. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165...

  11. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165...

  12. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165...

  13. 75 FR 10347 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Housing and Urban Development Federal Property Suitable as Facilities To Assist the Homeless; Notice #0;#0... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This...

  14. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION... and Native American Reservations. Major Federal facilities and Native American Reservations should...

  15. 75 FR 6997 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... Housing and Urban Development Federal Property Suitable as Facilities To Assist the Homeless; Notice #0;#0... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone...

  16. 75 FR 13347 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Housing and Urban Development Federal Property Suitable as Facilities To Assist the Homeless; Notice #0;#0... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This...

  17. 75 FR 54235 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... Housing and Urban Development Federal Property Suitable as Facilities To Assist the Homeless; Notice #0;#0... AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY:...

  18. 75 FR 51535 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... Housing and Urban Development Federal Property Suitable as Facilities to Assist the Homeless; Notice #0;#0... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This...

  19. 77 FR 40078 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... cannot be declared excess or made available for use as facilities to assist the homeless....

  20. 78 FR 59709 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... property cannot be declared excess or made available for use as facilities to assist the...

  1. 76 FR 78294 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... Act (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and... property cannot be declared excess or made available for use as facilities to assist the...

  2. 78 FR 55282 - Federal Housing Administration (FHA) Healthcare Facility Documents: Notice of Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... URBAN DEVELOPMENT Federal Housing Administration (FHA) Healthcare Facility Documents: Notice of... published in the Federal Register a notice that announced that FHA's healthcare facility documents completed... concluded a 10-month process through which HUD solicited public comment to update 115 healthcare...

  3. 75 FR 77954 - Transfer of Federally Assisted Facility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... Charlottesville Facilities Maintenance Division of Public Works. The facility and land sit within a secure Public Works Yard and any other acquiring agency would need access to use this property. DATES: Effective Date... Charlottesville Public Works Yard, and includes no street frontage. The north side of the facility is bounded...

  4. Earthquake resistant construction of electric transmission and telecommunication facilities serving the Federal government report

    SciTech Connect

    Yokel, F.Y.

    1990-02-01

    The vulnerability of electrical transmission and telecommunication facilities to damage in past earthquakes, as well as available standards and technologies to protect these facilities against earthquake damage are reviewed. An overview is presented of measures taken by various Federal agencies to protect electrical transmission and telecommunication facilities against earthquake hazards. It is concluded that while most new facilities which are owned and operated by Federal agencies are presently designed to provide some, though not necessarily adequate, earthquake resistance, there generally is no effort to retrofit existing facilities. No evidence was found of requirements to protect electrical transmission and communication facilities which have major contractual obligations to serve the Federal Government and only limited seismic design requirements are stipulated for electrical transmission systems constructed with Federal funding.

  5. 78 FR 7442 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for...

  6. 77 FR 38850 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for...

  7. 77 FR 49823 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the..., and surplus Federal property reviewed by HUD for suitability for use to assist the homeless. HUD... listing unutilized, underutilized, excess, and surplus Federal property will be published in the...

  8. 78 FR 5479 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  9. 76 FR 53481 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  10. 78 FR 68858 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  11. 77 FR 56858 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  12. 77 FR 12869 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  13. 76 FR 63944 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  14. 77 FR 46447 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  15. 77 FR 2079 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  16. 77 FR 55222 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed...

  17. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal...

  18. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Are Federal...

  19. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are Federal...

  20. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Are Federal...

  1. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Are Federal...

  2. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation...

  3. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation...

  4. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation...

  5. 41 CFR 102-74.585 - What Federal facility telework policy must Executive agencies follow?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What Federal facility telework policy must Executive agencies follow? 102-74.585 Section 102-74.585 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...

  6. State and Federal Policies for School Facility Construction: A Comparison of Michigan and Ohio

    ERIC Educational Resources Information Center

    Davis, Thomas E.

    2015-01-01

    Background: The Ohio School Facilities Commission was set up in response to litigation compelling the state to achieve a more equitable distribution in the quality of school facilities. The American Recovery and Reinvestment Act (ARRA) was a federal policy to stimulate the United States economy and support school facility construction. These two…

  7. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    SciTech Connect

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation

  8. 76 FR 44655 - Transfer of Federally Assisted Land or Facility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... authorize a recipient of FTA funds to transfer land or a facility to a public body for any public purpose.... This property is no longer needed by NICTD, as NICTD moved its South Bend Station to the South...

  9. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  10. 75 FR 60777 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...; NASA: Mr. Frank Bellinger, Facilities Engineering Division, National Aeronautics & Space Administration... Agency: NASA Property Number: 71201030001 Status: Excess Reasons: Secured Area Bldg. 536 Naval Air... Federal Building 145 Water Street Alpena, MI 49707 Landholding Agency: GSA Property Number:...

  11. 2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT WITH BRIDGE OVER CANAL SPILLWAY IN FOREGROUND AND MILL COMPLEX IN BACKGROUND - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  12. 76 FR 15042 - Transfer of Federally Assisted Land or Facility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... 5334(h) of the Federal Transit Laws, as codified, 49 U.S.C. 5301, et seq., permits the Administrator of... Administration, 200 West Adams, Suite 320, Chicago, IL 60606. FOR FURTHER INFORMATION CONTACT: Cecelia M. Comito, Regional Counsel, at 312-353-4118. SUPPLEMENTARY INFORMATION: Background 49 U.S.C. 5334(h)...

  13. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  14. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  15. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  16. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  17. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  18. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... implementing a determination under subpart A (44 CFR 352.6(d)), that Federal facilities and resources are... assumption that, in the event of an actual radiological emergency or disaster, State and local...

  19. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... implementing a determination under subpart A (44 CFR 352.6(d)), that Federal facilities and resources are... assumption that, in the event of an actual radiological emergency or disaster, State and local...

  20. 75 FR 39573 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... other real property that HUD has reviewed for suitability for use to assist the homeless. The...

  1. 75 FR 28634 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... other real property that HUD has reviewed for suitability for use to assist the homeless. The...

  2. 75 FR 43194 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... other real property that HUD has reviewed for suitability for use to assist the homeless. The...

  3. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity...

  4. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity...

  5. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... such facility uses any primary energy source other than geothermal resources. (c) General rule. Any... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity made...

  6. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity...

  7. 78 FR 54905 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  8. 78 FR 65698 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  9. 76 FR 8571 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... February 14, 2011 Part V Department of Housing and Urban Development Federal Property Suitable as..., 2011 / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning...

  10. 76 FR 12227 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... March 4, 2011 Part II Department of Housing and Urban Development Federal Property Suitable as... / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development,...

  11. 77 FR 7245 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... February 10, 2012 Part II Department of Housing and Urban Development Federal Property Suitable as..., 2012 / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning...

  12. 78 FR 53821 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... August 30, 2013 Part II Department of Housing and Urban Development Federal Property Suitable as..., 2013 / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning...

  13. 78 FR 9408 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... real property that HUD has reviewed for suitability for use to assist the homeless. The properties...

  14. 77 FR 32662 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... real property that HUD has reviewed for suitability for use to assist the homeless. The properties...

  15. 76 FR 38809 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... July 1, 2011 Part III Department of Housing and Urban Development Federal Property Suitable as... / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To...: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street, SW., Room 7266,...

  16. 78 FR 15127 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... March 8, 2013 Part II Department of Housing and Urban Development Federal Property Suitable as... / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as Facilities To...: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room 7266,...

  17. 18 CFR 292.204 - Criteria for qualifying small power production facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... production capacity of any other small power production facilities that use the same energy resource, are... mile of the facility for which qualification is sought and, for hydroelectric facilities, if they...

  18. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart A (44 CFR 352.6(c)(1)(2)). Upon a determination under subpart A (44 CFR 352.6(d)) that Federal... implementing the determinations made under subpart A (44 CFR 352.5(f) and 352.6(d)) so that each Federal agency... and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f)...

  19. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subpart A (44 CFR 352.6(c)(1)(2)). Upon a determination under subpart A (44 CFR 352.6(d)) that Federal... implementing the determinations made under subpart A (44 CFR 352.5(f) and 352.6(d)) so that each Federal agency... and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f)...

  20. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subpart A (44 CFR 352.6(c)(1)(2)). Upon a determination under subpart A (44 CFR 352.6(d)) that Federal... implementing the determinations made under subpart A (44 CFR 352.5(f) and 352.6(d)) so that each Federal agency... and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f)...

  1. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subpart A (44 CFR 352.6(c)(1)(2)). Upon a determination under subpart A (44 CFR 352.6(d)) that Federal... implementing the determinations made under subpart A (44 CFR 352.5(f) and 352.6(d)) so that each Federal agency... and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f)...

  2. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart A (44 CFR 352.6(c)(1)(2)). Upon a determination under subpart A (44 CFR 352.6(d)) that Federal... implementing the determinations made under subpart A (44 CFR 352.5(f) and 352.6(d)) so that each Federal agency... and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f)...

  3. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Minimum Security Standards for.... 1234, App. A Appendix A to Part 1234—Minimum Security Standards for Level III Federal Facilities Recommended Standards Chart Level III Perimeter Security Parking: Control of facility parking...

  4. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facility Ridesharing Program” (3 CFR, 1980 Comp., p. 138), Executive agencies must actively promote the use... is required to take steps to improve the air quality, and to reduce traffic congestion by providing...-occupancy modes of travel) by personnel working at Federal facilities to conserve energy, reduce...

  5. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the...

  6. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the...

  7. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the...

  8. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the...

  9. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the...

  10. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    SciTech Connect

    None,

    1980-05-01

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  11. 4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  12. 6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  13. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory Commission's...

  14. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Federal Energy Regulatory Commission's regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Availability...

  15. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory...

  16. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy...

  17. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management... 34 Education 2 2010-07-01 2010-07-01 false The location and operation of vending facilities for blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of...

  18. Authorizing the continued use of certain lands within the Sequoia National Park by portions of an existing hydroelectric project. A report submitted to the House of Representatives, Ninety-Ninth Congress, First Session

    SciTech Connect

    Not Available

    1985-01-01

    The report on House Joint Resolution 382, as amended, would allow a 10-year license for a hydroelectric plant currently operating within Sequoia National Park, but prohibit any expansion of the project. The first hydroelectric facility on the Kaweah River dates from the 1890s, shortly after the park was established to preserve California's sequoia trees. The legislation would require no additional federal funding and have no inflationary impact. Correspondence from the Department of Interior to the committee outlines the Department's philosophy and findings regarding the facility and suggests amendments along the lines of those proposed by the committee.

  19. Toward new institutional relationships in the development of small scale hydroelectric power

    SciTech Connect

    Brown, P.W.

    1980-12-01

    This paper will briefly discuss three principle subjects. These subjects are recent changes in hydroelectric licensing, provisions of the Public Utility Regulatory Policies Act of 1978 (PURPA) and the regulations promulgated pursuant to the Act by the Federal Energy Regulatory Commission (FERC) and Sections 221 and 222 (e), and Section 242 of the Crude Oil Windfall Profit Tax Act of 1980. The FERC has recently reformed its licensing and permit regulations and Congress has enacted Section 408 of the Energy Security Act to exempt certain projects from the FERC licensing. PURPA and the FERC regulations promulgated pursuant thereto guarantee markets for the output of small scale hydroelectric (SSH) plants and the provisions of the Windfall Profit Tax Act measurably assist in the raising of capital for the construction of SSH facilities. All three incentives are significant given the electric utility markets confronted by SSH developers and the capital intensive nature of SSH projects.

  20. 75 FR 41510 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  1. 78 FR 64000 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  2. 75 FR 2558 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ] ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW.,...

  3. 78 FR 50078 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  4. 76 FR 22719 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone...

  5. 75 FR 66774 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW.,...

  6. 75 FR 57052 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW.,...

  7. 75 FR 36435 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  8. 75 FR 62414 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW.,...

  9. 76 FR 75554 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  10. 76 FR 60855 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  11. 75 FR 34753 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  12. 76 FR 47606 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  13. 78 FR 755 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  14. 75 FR 82409 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone...

  15. 75 FR 79013 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone...

  16. 75 FR 49512 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street SW.,...

  17. 76 FR 70155 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  18. 75 FR 63501 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW.,...

  19. 75 FR 80836 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone...

  20. 78 FR 70066 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  1. 77 FR 29680 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  2. 77 FR 67389 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone...

  3. 78 FR 48710 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... and Urban Development, 451 Seventh Street SW., Room 7266, Washington, DC 20410; telephone (202) 402...: Agriculture: Ms. Debra Kerr, Department of Agriculture, Reporters Building, 300 7th Street SW., Room...

  4. 78 FR 31572 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... and Urban Development, 451 Seventh Street SW., Room 7266, Washington, DC 20410; telephone (202) 402...: Agriculture: Ms. Brenda Carignan, Department of Agriculture, Reporters Building, 300 7th Street SW., Room...

  5. 76 FR 21387 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7266, Washington, DC 20410; telephone...

  6. 76 FR 10610 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7266, Washington, DC 20410; telephone...

  7. 77 FR 14411 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... and Urban Development, 451 Seventh Street SW., Room 7266, Washington, DC 20410; telephone (202) 708... the date of this Notice. Where property is described as for ``off-site use only'' recipients of...

  8. 78 FR 52559 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ...: Excess Comments: Facility w/in controlled perimeter of a DoD installation; public access denied & no alter method to gain access w/out compromising nat'l security. Oregon Crescent Office-East Modular... Comments: 1,202 sf. 31 yrs.-old; poor conditions; existing federal need Crescent Office, FS ID...

  9. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    SciTech Connect

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  10. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  11. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Application Ready for...-12740-003. c. Date filed: July 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e....

  12. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer... exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December...

  13. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc....

  14. 76 FR 67723 - CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted... hydroelectric application has been filed with the Commission and is available for public inspection: a. Type...

  15. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and...

  16. Outmigration of landlocked Atlantic salmon (Salmo salar) smolts and effectiveness of an angled trash rack/fish bypass structure at a small scale hydroelectric facility. [Salmo salar

    SciTech Connect

    Nettles, D.C.; Gloss, S.P.

    1985-01-01

    Modes of downstream passage (penstock, spillway, diversion chute) by Atlantic salmon (Salmo salar) smolts were monitored using radio telemetry to assess the effectiveness of an angled trash rack/fish bypass structure at a small hydroelectric dam on the Boquet River, New York. Telemetry of 170 Atlantic salmon smolts and visual observations of stocked smolts were used to determine aspects of Atlantic salmon outmigration behavior. Smolts initiated mass migrations after river temperatures reached or exceeded 10/sup 0/C. Many radio-tagged smolts interrupted movements upon reaching ponded waters and/or the dam. River flow did not (P > .05) affect the frequency of migratory movements, passages, or rate of movement. Migrations were of approximately 30 days duration. Passages at the dam occurred primarily at night (61%) with diurnal passages (17%) and crepuscular passages (17%) of secondary importance. Timing of 5% of the passages was undetermined. All passages which occurred when angled trash racks were in place were through the bypass or over the spillway. Six (6) passages occurred when trash racks perpendicular to the penstock were in place: 3 of these were penstock passages. The angled trash rack and bypass structure served to reduce entrainment.

  17. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What energy conservation... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation §...

  18. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What energy conservation... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation §...

  19. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What energy conservation... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation §...

  20. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What energy conservation... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation §...

  1. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  2. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  3. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  4. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  5. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  6. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells Hydrolectric Project and Intention To Hold Public Meetings...

  7. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  8. Adapting federated cyberinfrastructure for shared data collection facilities in structural biology

    PubMed Central

    Stokes-Rees, Ian; Levesque, Ian; Murphy, Frank V.; Yang, Wei; Deacon, Ashley; Sliz, Piotr

    2012-01-01

    Early stage experimental data in structural biology is generally unmaintained and inaccessible to the public. It is increasingly believed that this data, which forms the basis for each macromolecular structure discovered by this field, must be archived and, in due course, published. Furthermore, the widespread use of shared scientific facilities such as synchrotron beamlines complicates the issue of data storage, access and movement, as does the increase of remote users. This work describes a prototype system that adapts existing federated cyberinfra­structure technology and techniques to significantly improve the operational environment for users and administrators of synchrotron data collection facilities used in structural biology. This is achieved through software from the Virtual Data Toolkit and Globus, bringing together federated users and facilities from the Stanford Synchrotron Radiation Lightsource, the Advanced Photon Source, the Open Science Grid, the SBGrid Consortium and Harvard Medical School. The performance and experience with the prototype provide a model for data management at shared scientific facilities. PMID:22514186

  9. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2014. Final rule.

    PubMed

    2013-08-01

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's "60 percent rule'' compliance calculation to determine "presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  10. Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309

    SciTech Connect

    Anderson, K.

    2012-04-01

    This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

  11. Arbuckle Mountain Hydroelectric project

    SciTech Connect

    Peterson, J.C.

    1986-02-01

    Hydropower regulations, particularly those which must be met during the pre-construction phase, have become considerably more extensive and complicated over the last few years. This article, which outlines the pre-construction phase of the Arbuckle Mountain Hydroelectric project, provides a good example of the steps developers should be prepared to take before construction commences. The Department of Energy is funding $750,000 of the project's $1,200,000 budget to gain meaningful and reliable information for the public regarding the development and operation of an inexpensive, low head, domestically manufactured cross-flow turbine. To satisfy their requirements several studies and reports are being prepared for the DOE.

  12. Initiating continuing improvement within Greenfield sites: A federal remanufacturing facility case study

    SciTech Connect

    Montgomery, J.C.; Paul, B.K.

    1992-09-01

    The setting for this study was a federal government remanufacturing depot, responsible for the replacement and overhaul of large wheeled vehicles. These vehicles include 2.5 and 5 ton trucks and their major subordinate component items such as engines, axles, and transmissions. At the time of the case study the depot was involved in the design and construction of a 400,000 square foot hard metal subordinate items remanufacturing facility. The purpose of the facility was to consolidate all existing subordinate item remanufacturing under one roof. Commodity items to be remanufactured within the facility included engines, transmissions, transfer cases, axles, differentials, power generators, and other components. From the onset, the concept of consolidating existing processes under one roof had posed a significant material handling problem. Digital simulation was used to analyze material flow patterns within the new facility. As a result it was determined that, without changing the existing flow of material between processes, significant choke points would form in the areas of shared-capacity resources such as cleaning and painting. It was estimated that these choke points, representing piles of work-in-process (WIP) inventory, would clog aisles and prevent forklifts from making essential deliveries. Thus, a strategy was needed for controlling the buildup of WIP inventory within the new facility. To accomplish this objective, a program was begun to certify the WIP inventory levels of each subordinate item commodity line within existing facilities prior to the move into the new facility. This program focused on training workers in new methods of inventory control, production control, and quality control needed to minimize the WIP levels required within the new facility.

  13. The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.

    1999-01-01

    Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the

  14. Requirements and impacts of the Federal Facility Compliance Act on the Department of Energy

    SciTech Connect

    Chang, L.; Tripp, S.C.

    1993-03-01

    The Federal Facilities Compliance Act (FFCA, the Act) was signed into law on October 6, 1992, primarily as a means of waiving sovereign immunity for federal facilities with respect to requirements under the Resource Conservation and Recovery Act. DOE`s implementation of the FFCA will have significant effects on current and future DOE waste management operations. DOE will need to rethink its strategy in the area of future compliance agreements to ensure commitments and deliverables are made consistent throughout the different DOE facilities. Several types of agreements that address mixed waste land disposal restriction (LDR) compliance have already been signed by both DOE and the regulators. These agreements are in place at the Hanford Reservation, the Savannah River Site, the Oak Ridge Reservation (Oak Ridge National Laboratory, K-25, Y-12), and the Paducah Gaseous Diffusion Plant. The Rocky Flats Agreement is now being renegotiated. Los Alamos National Laboratory, Sandia/Albuquerque National Laboratory, Lawrence Livermore National Laboratory, and Idaho National Engineering Laboratory agreements are in progress. Major components of the FFCA include provisions on: sovereign immunity waiver; cost reimbursements; mixed waste requirements, including inventory reports on mixed waste and treatment capacity and technologies; and plans for the development of treatment capacities and technologies. Each of these components is discussed within this paper.

  15. Legal factors affecting the financing of small scale hydroelectric projects

    SciTech Connect

    Wilson, W.H.; Ringo, M.J.; Forgione, N.

    1983-09-01

    An introduction to the major business organizational options open to small-scale hydroelectric (SSH) projects is given. The major federal income tax treatments of these options are compared. Significant general federal income tax factors affecting SSH projects are reintroduced and explained. Some of the special federal income tax problem areas in SSH development are isolated. Tax benefit flow through or transfer mechanisms are discussed. Tax exempt financing opportunities for private SSH projects are reviewed. (MHR)

  16. Investigation of a cluster of Legionella pneumophila infections among staff at a federal research facility.

    PubMed

    Sanchez, J L; Polyak, C S; Kolavic, S A; Brokaw, J K; Birkmire, S E; Valcik, J A

    2001-09-01

    An epidemiologic investigation was conducted in response to a case of Legionella pneumonia in a scientist working at a federal research facility. A survey of 80 individuals working at the facility revealed that 13 (16%) had sustained prior infections with Legionella pneumophila serogroup 1 (Lps1) as measured by anti-Lps1 antibodies. Antibody-positive individuals' offices clustered around an air cooling tower and a heating, ventilation, and air conditioner unit (odds ratio = 5). On multivariate logistic regression analysis, individuals of non-white race (adjusted odds ratio = 8) and smokers (adjusted odds ratio = 36) were also found to be at higher risk of past infection. Marked Legionella growth was noted in the cooling tower's water reservoir and potable hot water system, where suboptimal operating temperatures were noted. Subsequent increase in the hot water temperatures as well as a complete renovation of the affected building's air handling and potable water systems led to a reduction in Legionella species colonization. PMID:11569435

  17. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado... contract for hydroelectric power development at Ridgway Dam. SUMMARY: Current Federal policy encourages non... power at Ridgway Dam, a feature of the Dallas Creek Project. Reclamation is considering...

  18. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All... Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a. Date and Time of Meeting: Wednesday, August...

  19. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2017. Final rule.

    PubMed

    2016-08-01

    This final rule will update the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2017 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS's) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2017. This final rule also revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). PMID:27529901

  20. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2017. Final rule.

    PubMed

    2016-08-01

    This final rule will update the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2017 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS's) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2017. This final rule also revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP).

  1. Analysis of federal and state policies and environmental issues for bioethanol production facilities.

    PubMed

    McGee, Chandra; Chan Hilton, Amy B

    2011-03-01

    The purpose of this work was to investigate incentives and barriers to fuel ethanol production from biomass in the U.S. during the past decade (2000-2010). In particular, we examine the results of policies and economic conditions during this period by way of cellulosic ethanol activity in four selected states with the potential to produce different types of feedstocks (i.e., sugar, starch, and cellulosic crops) for ethanol production (Florida, California, Hawaii, and Iowa). Two of the four states, Iowa and California, currently have commercial ethanol production facilities in operation using corn feedstocks. While several companies have proposed commercial scale facilities in Florida and Hawaii, none are operating to date. Federal and state policies and incentives, potential for feedstock production and conversion to ethanol and associated potential environmental impacts, and environmental regulatory conditions among the states were investigated. Additionally, an analysis of proposed and operational ethanol production facilities provided evidence that a combination of these policies and incentives along with the ability to address environmental issues and regulatory environment and positive economic conditions all impact ethanol production. The 2000-2010 decade saw the rise of the promise of cellulosic ethanol. Federal and state policies were enacted to increase ethanol production. Since the initial push for development, expansion of cellulosic ethanol production has not happened as quickly as predicted. Government and private funding supported the development of ethanol production facilities, which peaked and then declined by the end of the decade. Although there are technical issues that remain to be solved to more efficiently convert cellulosic material to ethanol while reducing environmental impacts, the largest barriers to increasing ethanol production appear to be related to government policies, economics, and logistical issues. The numerous federal and state

  2. 77 FR 32621 - Developing Large-Scale Renewable Energy Projects at Federal Facilities Using Private Capital Draft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... of Energy Efficiency and Renewable Energy Developing Large-Scale Renewable Energy Projects at Federal Facilities Using Private Capital Draft AGENCY: Office of Energy Efficiency and Renewable Energy, Department... draft guidebook entitled Federal Renewable Energy Guide: Developing Large-Scale Renewable...

  3. Thermoclines: a solar thermal energy resource for enhanced hydroelectric power production.

    PubMed

    McNichols, J L; Ginell, W S; Cory, J S

    1979-01-12

    The solar thermal energy stored in hydroelectric reservoir thermoclines is very large and greatly exceeds the gravitational hydroenergy of the surface water, even after limitations arising from the second law of thermodynamics have been taken into account. Greatly enhanced power production can be obtained at present hydroelectric facilities if heat engines are adapted to exploit this large thermal energy resource.

  4. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false How will NIH monitor the use of facilities... AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH monitor the use of facilities constructed with federal funds? NIH may monitor the use of each...

  5. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false How will NIH monitor the use of facilities... AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH monitor the use of facilities constructed with federal funds? NIH may monitor the use of each...

  6. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false How will NIH monitor the use of facilities... AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH monitor the use of facilities constructed with federal funds? NIH may monitor the use of each...

  7. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  8. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace” (3 CFR, 1997 Comp., p. 216... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the...

  9. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace” (3 CFR, 1997 Comp., p. 216... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the...

  10. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace” (3 CFR, 1997 Comp., p. 216... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the...

  11. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace” (3 CFR, 1997 Comp., p. 216... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the...

  12. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace” (3 CFR, 1997 Comp., p. 216... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the...

  13. Gem State Hydroelectric Project, FERC No. 2952-Idaho

    SciTech Connect

    Not Available

    1982-09-01

    A draft environmental impact statement (EPA No. 820563D) describes the estimated effects of a proposed hydroelectric project on the Snake River in Idaho which would include a 4300 by 40 foot earthen dam, with dikes on either side, a power canal, powerhouse, and a 3.76-mile transmission line and facilities. Power generated at the site would serve Idaho Falls, which expects to double in population over the next 15 years. Local workers would fill the 250 construction jobs. The reservoir would diversify the area's recreational potential. Negative impacts would be the loss of 24,000 feet of the Snake River and associated aquatic habitat, which would affect fish populations. The higher water level would restrict larger boats to the upper reservoir. Inundation of two small dams would create some hazards to boaters and eliminate their power generating capacity. Legal mandates for the study were the DOE Organization Act of 1977, Federal Power Act, Federal Water Pollution Control Act of 1972, and National Historic Preservation Act of 1966.

  14. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  15. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing... priority is as follows: 1. BOST2 Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17,...

  16. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    SciTech Connect

    Moss, R. H.; Delgado, A.; Malone, E L.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  17. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making

  18. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  19. Assessing O&M Practices at Federal Facilities - What do the ESET Data Tell Us

    SciTech Connect

    Hunt, W. D.

    2006-09-13

    In late 2005, the Department of Energy (DOE) Federal Energy Management Program (FEMP) Energy Saving Expert Teams (ESET) conducted assessments at 28 Federal sites. These assessments were directed by President Bush in a memorandum to Federal agencies in response to projected natural gas shortages resulting from Hurricanes Katrina and Rita. The primary focus of the ESET assessments was to identify low-cost and no-cost (operations and maintenance-oriented) energy efficiency measures that the sites could quickly and easily adopt to relieve the expected supply shortfall, while also realizing significant energy and cost savings. The assessments successfully identified large potential natural gas savings opportunities available at low-cost/no-cost through energy efficiency measures such as boiler tune-ups, repair of steam and condensate leaks, repair of missing and/or damaged insulation, adjusting temperature and setback setpoints, and modifying equipment operating schedules. Because these savings opportunities were largely anticipated, the issue now becomes one of helping facility managers more easily identify and address these opportunities as they arise.

  20. Assessing O&M Practices at Federal Facilities - What do the ESET Data Tell Us

    SciTech Connect

    Hunt, W. D.

    2008-02-22

    In late 2005, the Department of Energy (DOE) Federal Energy Management Program (FEMP) Energy Saving Expert Teams (ESET) conducted assessments at 28 Federal sites. These assessments were directed by President Bush in a memorandum to Federal agencies in response to projected natural gas shortages resulting from Hurricanes Katrina and Rita. The primary focus of the ESET assessments was to identify low-cost and no-cost (operations and maintenance-oriented) energy efficiency measures that the sites could quickly and easily adopt to relieve the expected supply shortfall, while also realizing significant energy and cost savings. The assessments successfully identified large potential natural gas savings opportunities available at low-cost/no-cost through energy efficiency measures such as boiler tune-ups, repair of steam and condensate leaks, repair of missing and/or damaged insulation, adjusting temperature and setback setpoints, and modifying equipment operating schedules. Because these savings opportunities were largely anticipated, the issue now becomes one of helping facility managers more easily identify and address these opportunities as they arise.

  1. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  2. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  3. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  4. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  5. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power... Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

  6. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... Federal Energy Regulatory Commission (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47879... Hydroelectric Project (FERC Project No. 12576-004), to be located on the Des Moines River, in Marion...

  7. Post-occupancy energy efficiency evaluation of a LEED Platinum Federal Government facility

    NASA Astrophysics Data System (ADS)

    Tincher, Theresa

    The purpose of this study was to gain a comprehensive understanding of the Leadership in Energy and Environmental Design (LEEDRTM) certification system and its relevance to Federal policies, building codes, and building standards, develop experience with whole building energy modeling, and determine the actual post-occupancy energy usage as compared with developed model and design projections. This thesis hypothesized the U.S. Green Building Council's LEED rating system compared favorably to other policies, codes, and standards in use at the time, and the U.S. Bureau of Reclamations' LEED Platinum Lower Colorado Regional Office Green Building (LCROGB), located in Boulder City, Nevada, operated at least as energy efficiently as designed. Both hypotheses were shown to be true. Based on the design and development requirements for the 49,818 square foot LCROGB being studied, the primary building requirements addressed were the U.S. Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings, ASHRAE Standard 90.1-2007, and the LEED V2009 certification system for new construction. LEED V2009 certification requirements compared favorably by either meeting or exceeding other stated requirements. The whole building energy simulation, QUick Energy Simulation Tool (eQUEST) Version 3.65, was used for the study, and baseline and proposed models were developed. The eQUEST results compared favorably with the designer's simulations developed using the Hourly Analysis Program (HAP) Version 4.5. eQUEST predicted a 32.7% savings in overall energy usage, compared to the HAP 38.9% prediction. In 2013, the LCROGB used 600,042 kWh of energy, and 60% was electrical and 40% was natural gas. This usage demonstrated high building efficiency with an Energy Use Intensity (EUI) of 41.1 kBtu/sf/yr. Following more than two years of post-occupancy operation, the LCROGB was electrically more efficient than predicted by either HAP or eQUEST, although the facility was

  8. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2016. Final rule.

    PubMed

    2015-08-01

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2016 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF PPS's case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2016. This final rule also finalizes policy changes, including the adoption of an IRF-specific market basket that reflects the cost structures of only IRF providers, a 1-year phase-in of the revised wage index changes, a 3-year phase-out of the rural adjustment for certain IRFs, and revisions and updates to the quality reporting program (QRP).

  9. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  10. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2016. Final rule.

    PubMed

    2015-08-01

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2016 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF PPS's case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2016. This final rule also finalizes policy changes, including the adoption of an IRF-specific market basket that reflects the cost structures of only IRF providers, a 1-year phase-in of the revised wage index changes, a 3-year phase-out of the rural adjustment for certain IRFs, and revisions and updates to the quality reporting program (QRP). PMID:26248390

  11. Guidance for federal facilities on release notification requirements under CERCLA and SARA Title 3

    SciTech Connect

    Not Available

    1990-11-01

    The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA or Superfund''), as amended, creates a framework for Federal involvement in response to and cleanup of hazardous substance releases. Although many of its provisions deal with cleanup, liability, and compensation associated with inactive or abandoned hazardous waste sites, equally important parts of CERCLA address the reporting of and response to releases of hazardous substances as they occur. The statute establishes a list of hazardous substances,'' of which there are currently 727. The CERCLA list contains hazardous substances identified under other statutes, including the Clean Water Act (CWS), the Clean Air Act (CAA), and the Resource Conservation and Recovery Act (RCRA). CERCLA also contains a provision authorizing the Administrator of the US Environmental Protection Agency (EPA) to add substances to the list that when released into the environment may present substantial danger to the public health or welfare or the environment...'' EPA is providing this guidance document so that Federal facilities may better understand the CERCLA and SARA Title 3 release notification requirements. The information is presented in a variety of formats, including questions and answers, fact sheets, scenarios, and a flowchart. A glossary of key terms also has been included in this document. 5 figs.

  12. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2015.

    PubMed

    2014-08-01

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2015 as required by the statute. This final rule finalizes a policy to collect data on the amount and mode (that is, Individual, Concurrent, Group, and Co-Treatment) of therapy provided in the IRF setting according to therapy discipline, revises the list of diagnosis and impairment group codes that presumptively meet the "60 percent rule'' compliance criteria, provides a way for IRFs to indicate on the Inpatient Rehabilitation Facility-Patient Assessment Instrument (IRF-PAI) form whether the prior treatment and severity requirements have been met for arthritis cases to presumptively meet the "60 percent rule'' compliance criteria, and revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). This rule also delays the effective date for the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that were finalized in FY 2014 IRF PPS final rule and adopts the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that are finalized in this rule. This final rule also addresses the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), for the IRF prospective payment system (PPS), which will be effective when ICD-10-CM becomes the required medical data code set for use on Medicare claims and IRF-PAI submissions.

  13. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2015.

    PubMed

    2014-08-01

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2015 as required by the statute. This final rule finalizes a policy to collect data on the amount and mode (that is, Individual, Concurrent, Group, and Co-Treatment) of therapy provided in the IRF setting according to therapy discipline, revises the list of diagnosis and impairment group codes that presumptively meet the "60 percent rule'' compliance criteria, provides a way for IRFs to indicate on the Inpatient Rehabilitation Facility-Patient Assessment Instrument (IRF-PAI) form whether the prior treatment and severity requirements have been met for arthritis cases to presumptively meet the "60 percent rule'' compliance criteria, and revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). This rule also delays the effective date for the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that were finalized in FY 2014 IRF PPS final rule and adopts the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that are finalized in this rule. This final rule also addresses the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), for the IRF prospective payment system (PPS), which will be effective when ICD-10-CM becomes the required medical data code set for use on Medicare claims and IRF-PAI submissions. PMID:25122947

  14. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  15. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal...

  16. 78 FR 26361 - Duke Energy Carolinas, LLC, Keowee-Toxaway Hydroelectric Project; Notice of Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Duke Energy Carolinas, LLC, Keowee-Toxaway Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy...

  17. Legal obstacles and incentives to the third development of small-scale hydroelectric potential in the six New England states: executive summary

    SciTech Connect

    None,

    1980-05-01

    This executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities. It also highlights important features of the constitutional law, statutory law, case law, and regulations of each of the six New England states. The summary may serve as a concise overview of and introduction to the detailed reports prepared by the Energy Law Institute on the legal and regulatory systems of each of the six states. The dual regulatory system is a function of the federalist nature of our government. This dual system is examined from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development. The regulation of small dams are discussed and flow diagrams of the regulations are presented for each of the six states - Maine, Massachusetts, Vermont, New Hampshire, Vermont, and Connecticut.

  18. Chiller Controls-related Energy Saving Opportunities in FederalFacilities

    SciTech Connect

    Webster, Tom

    2003-01-01

    Chillers are a significant component of large facility energy use. The focus of much of the development of chilled water systems in recent years has been on optimization of set point and staging controls, improvements in chiller design to increase efficiency and accommodate chlorofluorocarbon (CFC) refrigerant replacements. Other improvements have been made by upgrading controls to the latest digital technologies, improving access and monitoring via communications and sophisticated liquid crystal displays (LCD), more robust fault diagnostics and operating and maintenance information logging. Advances have also been made in how chiller plant systems are designed and operated, and in the diversity of chiller products that are available to support innovative approaches. As in many industries, these improvements have been facilitated by advances in, and lower costs for, enabling technologies, such as refrigerants, compressor design, electronics for controls and variable frequency drives (VFD). Along with the improvements in electronics one would expect that advances have also been made in the functionality of unit controls included with chillers. Originally, the primary purpose of this project was to investigate the state of practice of chiller unit controllers in terms of their energy saving capabilities. However, early in the study it was discovered that advances in this area did not include incorporation of significantly different capabilities than had existed 10-15 years ago. Thus the scope has been modified to provide an overview of some of the basic controls-related energy saving strategies that are currently available along with guideline estimates of their potential and applicability. We have minimized consideration of strategies that could be primarily implemented via design practices such as chiller selection and plant design, and those that can only be implemented by a building management system (BMS). Also, since most of the floor space of federal buildings

  19. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility...). (b) A tribe can use IRR Program funds to fund 100 percent of the conversion or construction of a toll facility. (c) If a tribe obtains non-IRR Program Federal funding for the conversion or construction of...

  20. 41 CFR 102-37.180 - Does a SASP need special authorization to screen property at Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does a SASP need special authorization to screen property at Federal facilities? 102-37.180 Section 102-37.180 Public Contracts and...) Screening and Requesting Property § 102-37.180 Does a SASP need special authorization to screen property...

  1. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Government associated with, each program; (iv) Assessment of environmental or other benefits realized from... Order 12191, “Federal Facility Ridesharing Program,” agencies shall— (1) Establish an annual ridesharing...) Issue transit passes or similar vouchers to exchange for transit passes; (2) Furnish space,...

  2. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Government associated with, each program; (iv) Assessment of environmental or other benefits realized from... Order 12191, “Federal Facility Ridesharing Program,” agencies shall— (1) Establish an annual ridesharing...) Issue transit passes or similar vouchers to exchange for transit passes; (2) Furnish space,...

  3. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Government associated with, each program; (iv) Assessment of environmental or other benefits realized from... Order 12191, “Federal Facility Ridesharing Program,” agencies shall— (1) Establish an annual ridesharing...) Issue transit passes or similar vouchers to exchange for transit passes; (2) Furnish space,...

  4. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will...

  5. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will...

  6. A Proof-of-Concept for Semantically Interoperable Federation of IoT Experimentation Facilities.

    PubMed

    Lanza, Jorge; Sanchez, Luis; Gomez, David; Elsaleh, Tarek; Steinke, Ronald; Cirillo, Flavio

    2016-06-29

    The Internet-of-Things (IoT) is unanimously identified as one of the main pillars of future smart scenarios. The potential of IoT technologies and deployments has been already demonstrated in a number of different application areas, including transport, energy, safety and healthcare. However, despite the growing number of IoT deployments, the majority of IoT applications tend to be self-contained, thereby forming application silos. A lightweight data centric integration and combination of these silos presents several challenges that still need to be addressed. Indeed, the ability to combine and synthesize data streams and services from diverse IoT platforms and testbeds, holds the promise to increase the potentiality of smart applications in terms of size, scope and targeted business context. In this article, a proof-of-concept implementation that federates two different IoT experimentation facilities by means of semantic-based technologies will be described. The specification and design of the implemented system and information models will be described together with the practical details of the developments carried out and its integration with the existing IoT platforms supporting the aforementioned testbeds. Overall, the system described in this paper demonstrates that it is possible to open new horizons in the development of IoT applications and experiments at a global scale, that transcend the (silo) boundaries of individual deployments, based on the semantic interconnection and interoperability of diverse IoT platforms and testbeds.

  7. A Proof-of-Concept for Semantically Interoperable Federation of IoT Experimentation Facilities

    PubMed Central

    Lanza, Jorge; Sanchez, Luis; Gomez, David; Elsaleh, Tarek; Steinke, Ronald; Cirillo, Flavio

    2016-01-01

    The Internet-of-Things (IoT) is unanimously identified as one of the main pillars of future smart scenarios. The potential of IoT technologies and deployments has been already demonstrated in a number of different application areas, including transport, energy, safety and healthcare. However, despite the growing number of IoT deployments, the majority of IoT applications tend to be self-contained, thereby forming application silos. A lightweight data centric integration and combination of these silos presents several challenges that still need to be addressed. Indeed, the ability to combine and synthesize data streams and services from diverse IoT platforms and testbeds, holds the promise to increase the potentiality of smart applications in terms of size, scope and targeted business context. In this article, a proof-of-concept implementation that federates two different IoT experimentation facilities by means of semantic-based technologies will be described. The specification and design of the implemented system and information models will be described together with the practical details of the developments carried out and its integration with the existing IoT platforms supporting the aforementioned testbeds. Overall, the system described in this paper demonstrates that it is possible to open new horizons in the development of IoT applications and experiments at a global scale, that transcend the (silo) boundaries of individual deployments, based on the semantic interconnection and interoperability of diverse IoT platforms and testbeds. PMID:27367695

  8. A Proof-of-Concept for Semantically Interoperable Federation of IoT Experimentation Facilities.

    PubMed

    Lanza, Jorge; Sanchez, Luis; Gomez, David; Elsaleh, Tarek; Steinke, Ronald; Cirillo, Flavio

    2016-01-01

    The Internet-of-Things (IoT) is unanimously identified as one of the main pillars of future smart scenarios. The potential of IoT technologies and deployments has been already demonstrated in a number of different application areas, including transport, energy, safety and healthcare. However, despite the growing number of IoT deployments, the majority of IoT applications tend to be self-contained, thereby forming application silos. A lightweight data centric integration and combination of these silos presents several challenges that still need to be addressed. Indeed, the ability to combine and synthesize data streams and services from diverse IoT platforms and testbeds, holds the promise to increase the potentiality of smart applications in terms of size, scope and targeted business context. In this article, a proof-of-concept implementation that federates two different IoT experimentation facilities by means of semantic-based technologies will be described. The specification and design of the implemented system and information models will be described together with the practical details of the developments carried out and its integration with the existing IoT platforms supporting the aforementioned testbeds. Overall, the system described in this paper demonstrates that it is possible to open new horizons in the development of IoT applications and experiments at a global scale, that transcend the (silo) boundaries of individual deployments, based on the semantic interconnection and interoperability of diverse IoT platforms and testbeds. PMID:27367695

  9. Evaluation of the modular inclined screen (MIS) at the Green Island Hydroelectric Project: 1995 test results

    SciTech Connect

    Shiers, P.F.; Downing, J.K.; Plizga, A.W.; Taft, E.P.; Amaral, S.V.; Cook, T.C.; Marks, R.A.; Winchell, F.C.

    1996-05-01

    The Electric Power Research Institute (EPRI) developed a fish diversion screen, known as the Modular Inclined Screen (MIS), to prevent fish mortality at water intakes. hydraulic model testing and successful biological evaluation of the MIS had been completed in the laboratory. Following discussions with various federal and state agencies, the Green Island hydroelectric Project was selected as the field test location. This project is located on the Hudson River, just north of Albany, in Green Island, New York. The MIS test facility was operated and tested in the fall of 1995. In addition to the MIS, the effectiveness of a strobe light system was studied to determine its ability to divert blueblack herring form the river to the MIS.

  10. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source and…

  11. Conceptual aspects of fiscal interactions between local governments and federally-owned, high-level radioactive waste-isolation facilities

    SciTech Connect

    Bjornstad, D.J.; Johnson, K.E.

    1981-01-01

    This paper examines a number of ways to transfer revenues between a federally-owned high level radioactive waste isolation facility (hereafter simply, facility) and local governments. Such payments could be used to lessen fiscal disincentives or to provide fiscal incentives for communities to host waste isolation facilities. Two facility characteristics which necessitate these actions are singled out for attention. First, because the facility is federally owned, it is not liable for state and local taxes and may be viewed by communities as a fiscal liability. Several types of payment plans to correct this deficiency are examined. The major conclusion is that while removal of disincentives or creation of incentives is possible, plans based on cost compensation that fail to consider opportunity costs cannot create incentives and are likely to create disincentives. Second, communities other than that in which the facility is sited may experience costs due to the siting and may, therefore, oppose it. These costs (which also accrue to the host community) arise due to the element of risk which the public generally associates with proximity to the transport and storage of radioactive materials. It is concluded that under certain circumstances compensatory payments are possible, but that measuring these costs will pose difficulty.

  12. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  13. Environmental mitigation at hydroelectric projects: Volume II. Benefits and costs of fish passage and protection

    SciTech Connect

    Francfort, J. E.; Cada, G. F.; Dauble, D. D.; Hunt, R. T.; Jones, D. W.; Rinehart, B. N.; Sommers, G. L.; Costello, R. J.

    1994-01-01

    The Department of Energy, through its hydropower program, is studying environmental mitigation practices at hydroelectric projects. The study of environmental mitigation is intended to provide greater understanding of environmental problems and solutions that are associated with conventional hydroelectric projects. This volume examines upstream and downstream fish passage/protection technologies and the associated practices, benefits, and costs. Fish passage/protection mitigation technologies are investigated by three methods: (a) national, regional (Federal Energy Regulatory Commission regions), and temporal frequencies of fish passage/protection mitigation are examined at 1,825 operating and conventional (excludes pumped storage) Federal Energy Regulatory Commission (FERC) regulated hydroelectric sites in the United States; (b) general fish passage/protection mitigation costs are discussed for 50 FERC regulated hydroelectric projects; and (c) 16 case studies are used to examine specific fish passage/protection mitigation practices, benefits, and costs.

  14. Flood forecasting for Tucurui Hydroelectrical Plant, Brazil

    SciTech Connect

    Solomon, S.I.; Basso, E.; Osorio, C.; Melo de Moraes, H.; Serrano, A.

    1986-04-01

    The construction of the Tucurui Hydroelectric Plant on the Tocantins River basin in Brazil requires flood forecasting to ensure the safety of the cofferdam. The latter has been initially designed for a flood with a return frequency of one in 25 years. Lack of adequate forecasting facilities during the earlier stages of construction has resulted in significant damages and construction delays. Statistical forecasting models were developed by Projeto de Hidrologia y Climatologie da Amazonia (PHCA) for the purpose of preventing further damage at the site. The application of these models during the 1980 flood season, when the highest flood on record occurred at the Tucurui site, proved of great assistance in preventing the flooding of the cofferdam. In conjunction with the development of these models a number of data collection platforms using data transmission through the GOES system were installed to provide the data required for forecasting.

  15. A Study of United States Hydroelectric Plant Ownership

    SciTech Connect

    Hall, Douglas G.; Reeves, Kelly S.

    2006-06-01

    Ownership of United States hydroelectric plants is reviewed from several perspectives. Plant owners are grouped into six owner classes as defined by the Federal Energy Regulatory Commission. The numbers of plants and the corresponding total capacity associated with each owner class are enumerated. The plant owner population is also evaluated based on the number of owners in each owner class, the number of plants owned by a single owner, and the size of plants based on capacity ranges associated with each owner class. Plant numbers and corresponding total capacity associated with owner classes in each state are evaluated. Ownership by federal agencies in terms of the number of plants owned by each agency and the corresponding total capacity is enumerated. A GIS application that is publicly available on the Internet that displays hydroelectric plants on maps and provides basic information about them is described.

  16. 77 FR 20838 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ..., April 6, 2012. As a result, HUD's next report listing unutilized, underutilized, excess, and surplus Federal property will be published in the Federal Register on April 20, 2012. FOR FURTHER INFORMATION... Federal Register on April 20, 2012. Dated: March 29, 2012. Mark R. Johnston, Deputy Assistant...

  17. Financing of private small scale hydroelectric projects: a summary guide

    SciTech Connect

    Not Available

    1981-05-01

    Small-scale hydroelectric (SSH) projects are increasingly being supported financially by private developers. Increases in fossil fuel prices, difficulties in the siting of large power plants, streamlining of the federal licensing process, changes in the marketing of power, and the extension of tax credits-all contribute to expectations of profitability in SSH projects. This document provides an overview of private financing for SSH projects.

  18. 76 FR 14590 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Regulation Supplement; Safety of Facilities, Infrastructure, and Equipment for Military Operations (DFARS... Authorization Act for Fiscal Year 2010. Section 807 requires that facilities, infrastructure, and equipment that.... Facilities, infrastructure, and equipment shall be inspected prior to use to ensure safety and...

  19. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    SciTech Connect

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L.; Cada, G.F.; Jones, D.W.; Dauble, D.D.; Hunt, R.T.; Costello, R.J.

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  20. 77 FR 38050 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 4, 2012, Grand Coulee...

  1. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project...

  2. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Middle Fork American River Hydroelectric Project Placer County Water Agency... comments on the draft environmental impact statement for the Middle Fork American River Project No....

  3. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of Energy Projects has... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Environmental...

  4. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Regulatory Commission's regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Availability...

  5. 77 FR 12835 - American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer... North Fork, Shenandoah River in Shenandoah County, Virginia. The transfer of an exemption does...

  6. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, May 6, 2011 at 1 p.m. (Pacific Time)....

  7. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, April 15, 2011 at 9 a.m. (Pacific Time)....

  8. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing... Parish, Louisiana. The applications were filed by FFP Missouri 17, LLC for Project No. 13824- 000...

  9. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  10. 75 FR 42835 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... FR Federal Register FTE Full-time Equivalent FY Federal Fiscal Year HCFA Health Care Financing... Assessment Instrument PPS Prospective Payment System QIC Qualified Independent Contractors RAC Recovery Audit... 2002 IRF PPS final rule (66 FR 41316) and the FY 2006 IRF PPS final rule (70 FR 47880), we...

  11. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  12. 78 FR 34398 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and...

  13. 78 FR 57874 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and...

  14. 75 FR 66683 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Defense Acquisition Regulations System 48 CFR Parts 246 and 252 RIN 0750-AG73 Defense Federal Acquisition... Case 2009-D029) AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... Federal Acquisition Regulation Supplement (DFARS) to implement section 807 of the National...

  15. 75 FR 16822 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... Act (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and... intention to declare the property excess to the agency's needs, or (3) a statement of the reasons that the... law, subject to screening for other Federal use. At the appropriate time, HUD will publish...

  16. 77 FR 3958 - Coordination of Federal Authorizations for Electric Transmission Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ..., data, and information regarding the proposed coordination rule published December 13, 2011 (76 FR 77432... INFORMATION: On December 13, 2011, DOE published a proposed rule in the Federal Register (76 FR 77432) to...; ] DEPARTMENT OF ENERGY 10 CFR Part 900 RIN 1901-AB18 Coordination of Federal Authorizations for...

  17. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (a) The State, local or tribal agency responsible for implementing and enforcing the SIP or TIP can... EPA as a SIP revision; (7) The SIP revision must be approved by EPA. (b) The facility-wide budget... facility budget adopted pursuant to paragraph (a) of this section are “presumed to conform” to the SIP...

  18. 78 FR 25184 - Federal Housing Administration (FHA): Section 232 Healthcare Facility Insurance Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... bring the regulations up-to-date to reflect current policy and practices in healthcare facility...): Section 232 Healthcare Facility Insurance Program--Strengthening Accountability and Regulatory Revisions..., 2012, HUD published a final rule that revised the regulations governing the insurance of...

  19. Report on siphon penstocks for hydroelectric projects

    SciTech Connect

    Not Available

    1989-02-01

    This report on the use of siphon penstocks for hydroelectric installations has been prepared under DOE Contract AC07-82ID12356 by Acres International Corporation and draws extensively on the information and data assembled by the following organizations: CHI Engineering Services; Clearwater Hydro; Gannett Fleming Water Resources Engineers, Inc.; Harza Engineering Company; J. Kenneth Fraser and Associates, P.C.; Mead and Hunt, Inc.; TKO Power--Ott Water Engineers, Inc.; and Williams and Broome, Inc. The purpose of the study was to review the design, construction, operation, and maintenance considerations for siphon penstocks. The discussions, data, and information presented are based on experiences with the following operational siphon penstock plants: Columbia Mills Hydroelectric Plant, Virginia; Jim Falls Minimum Flow Unit Hydro Development, Wisconsin; Lac Courte Oreilles Hydro Development, Wisconsin; Ontelaunee Hydroelectric Project, Pennsylvania; Pine Grove Dam Hydroelectric Station, Pennsylvania; Pocono Lake Hydroelectric Project, Pennsylvania; Schaads Reservoir Hydroelectric Project, California; Second Broad River Hydroelectric Project, North Carolina; Superior Dam Power Station, Michigan; Tierckenkill Falls Hydroelectric Project, New York; and Traicao Hydroelectric Project, Brazil. 71 figs., 12 tabs.

  20. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    SciTech Connect

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  1. 78 FR 13883 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... other Federal use. At the appropriate time, HUD will publish the property in a Notice showing it as... Building California W. Branch Station 18N31 Happy Camp CA 96039 Landholding Agency: Agriculture...

  2. 77 FR 51546 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... appropriate landholding agencies at the following addresses AIR FORCE: Mr. Robert Moore, Air Force Real... Alan Bible Federal Bldg. 600 S. Las Vegas Blvd. Las Vegas NV 89101 Landholding Agency: GSA...

  3. 78 FR 26061 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Matteo, Department of the Navy, Asset Management Division, Naval Facilities Engineering Command... accessible by road New Jersey US Coast Guard Shark River 125 Washington Ave. Avon by the Sea NJ...

  4. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Required. Review/establish uniform standards for construction Required. Review/establish new design... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... control procedures for service contract personnel Required. Construction/Renovation: Install mylar film...

  5. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Required. Review/establish uniform standards for construction Required. Review/establish new design... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... control procedures for service contract personnel Required. Construction/Renovation: Install mylar film...

  6. 78 FR 67180 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ....; USDA research facility; 12= months vacant; good condition; some water damage; contact GSA for more info... Guard Sector Buffalo 1 Futhrmann Blvd. Buffalo NY 14203 Landholding Agency: Coast Guard Property...

  7. Medicaid nursing facility reimbursement in flux: effects of federal regulatory changes and prevailing fiscal conditions, 1978-1998.

    PubMed

    Miller, Edward Alan

    2005-01-01

    Basic concepts and trends are examined in Medicaid nursing facility reimbursements between 1978 and 1998, because Medicaid payment reform is a common budget reduction strategy pursued by state officials. Non-incremental changes in state rate-setting methods, as well as incremental changes in per diem rates and expenditures per recipient, are analyzed. In addition to substantial cross-state variation, results reveal clear trends in reimbursement policy characteristics over time. Not only do these track closely with changes in the federal regulatory environment, but they also track closely with prevailing fiscal and economic conditions. Given the serious ramifications reimbursement policy changes can have for nursing home residents and providers, it is imperative that the impact of federal disengagement from this policy area be understood. PMID:15911517

  8. Low-Energy Building Design Guidelines: Energy-Efficient Design for New Federal Facilities

    SciTech Connect

    Zachman, W.; Carlisle, N.

    2001-07-19

    This guidebook has been prepared primarily for Federal energy managers to provide practical information for applying the principles of low-energy, whole-building design in new Federal buildings. An important objective of this guidebook is to teach energy managers how to be advocates for renewable energy and energy-efficient technologies, and how to apply specific strategies during each phase of a given project's time line. These key action items are broken out by phase and appear in abbreviated form in this guidebook.

  9. Radiation Detection Field Test at the Federal Express (FedEx) Air Cargo Facility at Denver International Airport (DIA)

    SciTech Connect

    Weirup, D; Waters, A; Hall, H; Dougan, A; Trombino, D; Mattesich, G; Hull, E; Bahowick, S; Loshak, A; Gruidl, J

    2004-02-11

    Lawrence Livermore National Laboratory (LLNL) recently conducted a field-test of radiation detection and identification equipment at the air cargo facility of Federal Express (FedEx) located at Denver International Airport (DIA) over a period of two weeks. Comprehensive background measurements were performed and were analyzed, and a trial strategy for detection and identification of parcels displaying radioactivity was implemented to aid in future development of a comprehensive protection plan. The purpose of this project was threefold: {sm_bullet} Quantify background radiation environments at an air cargo facility. {sm_bullet} Quantify and identify ''nuisance'' alarms. {sm_bullet} Evaluate the performance of various isotope identifiers deployed in an operational environment (in this case, the operational environment included the biggest blizzard in over 90 years!).

  10. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  11. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    SciTech Connect

    Not Available

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  12. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  13. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  14. Guidebook to excellence: A directory of federal facilities and other resources for mathematics and science education improvement. [Contains acronym list

    SciTech Connect

    Shipman, T.

    1993-01-01

    The Guidebook to Excellence is a State-by-State directory of Federal facilities and other resources for improving mathematics and science education. This directory, the first of its kind, is being published to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal No. 4: By the year 2000, US students will be first in the world in science and mathematics achievement. Some of the larger research facilities in this directory, such as those of NASA, EPA and the Departments of Energy, Commerce, and the Interior, provide a wide range of education programs, and some offer students and teachers hands on experience with state-of-the-art research in world class facilities. Other sites, such as those of the Department of Transportation or Agriculture may be quite small, but can provide assistance in a single field of research or workforce expertise. Also listed are individuals responsible for State or regional coordination of major programs, such as the US Department of Education's Eisenhower Mathematics and Science Education Program, or the National Science Foundation's Statewide Systemic Initiative Program. In addition, each State listing includes facilities or coordinators providing regional assistance from neighboring States.

  15. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... with 10 CFR 50.47(c)(1). The host FEMA Regional Administratorshall make a recommendation to the FEMA... and agencies; and (2) Shall assume that, in the event of an actual radiological emergency or...

  16. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... with 10 CFR 50.47(c)(1). The host FEMA Regional Administratorshall make a recommendation to the FEMA... and agencies; and (2) Shall assume that, in the event of an actual radiological emergency or...

  17. 77 FR 3915 - Federal Support for the Randolph-Sheppard Vending Facility Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... successfully operated food services and commercial ventures at Federal, State, and private buildings and... opportunities for blind individuals. From a simple snack shop, to tourist services at the Hoover Dam, to full food-services operations at military installations, blind entrepreneurs have provided...

  18. 3 CFR - Federal Support for the Randolph-Sheppard Vending Facility Program

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... tourist services at the Hoover Dam, to full food-services operations at military installations, blind..., blind business managers have successfully operated food services and commercial ventures at Federal... to succeed without limits, earn equal pay for equal jobs, and aspire to full-time,...

  19. 78 FR 40491 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... Area Land Kentucky Big Sugar Creek Access Site U.S. Hwy 42 & Hwy 127 Gallatin KY 41095 Landholding... toll- free), or call the toll-free Title V information line at 800-927-7588. SUPPLEMENTARY...

  20. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Certifications and Determinations § 352.6 FEMA determination on... with 10 CFR 50.47(c)(1). The host FEMA Regional Administratorshall make a recommendation to the...

  1. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Certifications and Determinations § 352.6 FEMA determination on... with 10 CFR 50.47(c)(1). The host FEMA Regional Administratorshall make a recommendation to the...

  2. 76 FR 68170 - Instructions for Implementing Sustainable Locations for Federal Facilities in Accordance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Instructions as part of their compliance with E.O. 13514. Authority: E.O. 13514, 74 FR 52117 Dated: October 28... 13514 (``E.O. 13514''), ``Federal Leadership in Environmental, Energy, and Economic Performance,'' signed by President Obama on October 5, 2009. 74 FR 52117, Oct. 8, 2009. The purpose of the...

  3. 78 FR 26879 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... IRF PPS notice (77 FR 44618) to update the Federal prospective payment rates for FY 2014 using updated... 2002 IRF PPS final rule (66 FR 41316) and the FY 2006 IRF PPS final rule (70 FR 47880), we are... PPS from FY 2002 through FY 2005, as described in the FY 2002 IRF PPS final rule (66 FR 41316),...

  4. 76 FR 24213 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Cost Index EHR Electronic Health Record FI Fiscal Intermediary FR Federal Register FTE Full-time... provisions appears in the original FY 2002 IRF PPS final rule (66 FR 41316) and the FY 2006 IRF PPS final rule (70 FR 47880), we are providing below a general description of the IRF PPS for fiscal years...

  5. 78 FR 47859 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... FY 2013 IRF PPS notice (77 FR 44618) to update the federal prospective payment rates for FY 2014... the IRF PPS provisions appears in the original FY 2002 IRF PPS final rule (66 FR 41316) and the FY 2006 IRF PPS final rule (70 FR 47880), we are providing below a general description of the IRF PPS...

  6. 77 FR 44618 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... PPS final rule (76 FR 47836 at 47848 through 47863) to compute the FY 2013 market basket increase... methods described in the FY 2012 IRF PPS final rule (76 FR 47836) to update the Federal prospective... (66 FR 41316) and the FY 2006 IRF PPS final rule (70 FR 47880), we are providing below a...

  7. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... with 10 CFR 50.47(c)(1). The host FEMA Regional Administratorshall make a recommendation to the FEMA... 44 CFR 352.21. FEMA shall inform the licensee, the States and affected local governments in...

  8. 76 FR 13425 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Energy, Office of Engineering & Construction Management, MA-50, 1000 Independence Ave., SW., Washington..., Director of Real Estate, Department of the Navy, Naval Facilities Engineering Command, Washington Navy Yard... BUILDING ILLINOIS 1LT A.J. Ellison ] Army Reserve Wood River IL 62095 Landholding Agency: GSA...

  9. 77 FR 26304 - Federal Housing Administration (FHA) Healthcare Facility Documents: Proposed Revisions and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Project (both tangible, and intangible), operated on the Land as a Nursing Home, Intermediate Care..., 2011, at 76 FR 24363, HUD published a notice announcing HUD's completion of the updates to the... facilities. Each individual loan must meet HUD's underwriting standards on its own merit....

  10. 77 FR 26218 - Federal Housing Administration (FHA): Section 232 Healthcare Facility Insurance Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ..., purchase, and refinancing of nursing homes, intermediate care facilities, board and care homes, and... medical and social services.\\2\\ These demands include greater need for nursing homes, long-term care... living have expanded, nursing homes will likely retain a major role in caring for the most...

  11. 76 FR 77432 - Coordination of Federal Authorizations for Electric Transmission Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ...) (73 FR 54456). The interim final rule became effective on October 20, 2008, and the regulations can be... (NOPR) which proposed amendments to the interim final rule (73 FR 54461). This proposed rule would amend... facilities located within the Electric Reliability Council of Texas (ERCOT) interconnection because...

  12. 76 FR 3921 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... to HHS, addressed to Theresa Rita, Division of Property Management, Program Support Center, HHS, room..., Washington, DC 20593-0001; (202) 475-5609; GSA: Mr. Gordon Creed, General Services Administration, Office of..., Naval Facilities Engineering Command, Washington Navy Yard, 1330 Patterson Ave., SW., Suite...

  13. 76 FR 76984 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... lead based paint, asbestos, and mold in all bldgs.; sq. ft. varies; current use: office 5 Bldgs. Ft..., asbestos, and mold; sq. ft. varies; current use: office 10 Bldgs. Ft. Knox Ft. Knox KY 40121 Landholding... storage; possible asbestos and mold Maryland 13 Bldgs. Naval Support Facility Larderock MD...

  14. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    SciTech Connect

    Hildebrandt, S. G.; Bell, M. C.; Anderson, J. J.; Richey, E. P.; Parkhurst, Z. E.

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  15. Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

    SciTech Connect

    Not Available

    1980-05-01

    The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

  16. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of authority for approval of structural plans for non-Federal hydroelectric projects affecting... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers, dated March 11, 1975) Cross Reference: For regulations of the Federal Energy...

  17. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of authority for approval of structural plans for non-Federal hydroelectric projects affecting... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers, dated March 11, 1975) Cross Reference: For regulations of the Federal Energy...

  18. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of authority for approval of structural plans for non-Federal hydroelectric projects affecting... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers, dated March 11, 1975) Cross Reference: For regulations of the Federal Energy...

  19. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of authority for approval of structural plans for non-Federal hydroelectric projects affecting... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers, dated March 11, 1975) Cross Reference: For regulations of the Federal Energy...

  20. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of authority for approval of structural plans for non-Federal hydroelectric projects affecting... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers, dated March 11, 1975) Cross Reference: For regulations of the Federal Energy...

  1. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995

    SciTech Connect

    1996-01-01

    This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  2. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

    SciTech Connect

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  3. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  4. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability...

  5. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico AGENCY: Bureau of Reclamation,...

  6. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    SciTech Connect

    Not Available

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  7. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995

    SciTech Connect

    1995-07-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  8. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995

    SciTech Connect

    1995-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  9. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC... affected by issuance of a license for the proposed Red River Lock & Dam No. 4 Hydroelectric Project No... Hydroelectric LLC, as applicant for the proposed Red River Lock & Dam No. 4 Project No. 12757, is invited...

  10. Indian River Hydroelectric Project Grant

    SciTech Connect

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  11. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  12. Alaska Power Administration federal power program financial statements with supplementary information September 30, 1993 and September 30, 1992 with auditors` reports thereon

    SciTech Connect

    Not Available

    1994-02-14

    The mission of the Alaska Power Administration is to operate and maintain Alaska`s Federal hydroelectric generation and transmission facilities in an efficient, reliable, safe, and environmentally sensitive manner. The power from the facilities is marketed in a manner so as to repay their federal debt and provide widespread use of the power resources at the lowest cost to consumers consistent with sound business principles. This document presents fiscal 1993 accomplishments, future plans, results of operations, sales and revenues, expenses, debt service, repayment status, net cash flow, system reliability, and a report of independent accountants.

  13. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File...

  14. 77 FR 63811 - FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application.... b. Project No.: 13768-001. c. Date Filed: August 17, 2012. d. Submitted By: Free Flow...

  15. Involving the public in decision-making at federal facilities: The Department of Energy experience

    SciTech Connect

    Gesalman, C.M.

    1996-12-31

    The Department of Energy is involved in cleanup of a wide variety of sites used in the development and production of nuclear weapons. Substantial and increasing efforts have been made to involve the public in the planning and implementation of the cleanup projects. Early in the program, public participation was mainly an information transfer effort. More recently, innovative techniques have been used to increase public understanding of the tradeoffs required in making cleanup decisions (e.g., more stringent cleanup standards lead to higher costs). Sites now realize that relationships are key and are working to develop them. Advisory boards have been established at several sites. The methods of forming the boards have varied from site to site, as have the size of the group and the issues addressed. The effectiveness of the boards in their goal of improving public participation at the sites will be evaluated in the next fiscal year. DOE has sought public input on an increasing number of issues, such as future use of its facilities, environmental justice concerns, and budget development. Assumptions about future use of sites are crucial to setting realistic cleanup standards and controlling costs. Decisions made in the early phases of the budget process are now based in part on stakeholder input regarding priorities; for example, stakeholder concerns about and support for emphasizing plutonium cleanup at Rocky Flats have led to changes in priorities between the materials stabilization and environmental restoration programs. Environmental justice has become an increasing issue; sites must ensure that public participation programs effectively reach minority and low-income populations.

  16. Feasibility study for La Paz Hydroelectric Power Plant Project. Export trade information

    SciTech Connect

    Not Available

    1991-12-01

    A feasibility study for a hydroelectric project is defined as an investigation whose purpose is to determine whether any reasonable acceptable design for a project is technically viable. Alternatives of site development are studied and various solutions for civil works and equipment sizing are evaluated. When alternatives are considered technically viable they are then evaluated for financial viability. The purpose of the study is to evaluate the viability of the La Paz Hydroelectric Project. The La Paz Feasibility Study discusses: Site Characteristics and Existing Facilities; Hydrology and Sedimentation; Alternatives and Development; Hydraulics; Project Energy Output; Environmental, Social and Institutional Impacts; Project Cost Analysis; Market Considerations; Economics; Financial Analysis; and Project Implementation.

  17. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  18. Review of Pacific Northwest Laboratory research on aquatic effects of hydroelectric generation and assessment of research needs

    SciTech Connect

    Fickeisen, D.H.; Becker, C.D.; Neitzel, D.A.

    1981-05-01

    This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams and operating procedures and occur within a specific ecosystem, the results of these studies have application at hydroelectric generating facilities throughout the United States.

  19. Decommissioning of German Nuclear Research Facilities under the Governance of the Federal Ministry of Education and Research

    SciTech Connect

    Weigl, M.

    2008-07-01

    Since the announcement of the first nuclear program in 1956, nuclear R and D in Germany has been supported by the Federal Government under four nuclear programs and later on under more general energy R and D programs. The original goal was to help German industry to achieve safe, low-cost generation of energy and self-sufficiency in the various branches of nuclear technology, including the fast breeder reactor and the fuel cycle. Several national research centers were established to host or operate experimental and demonstration plants. These are mainly located at the sites of the national research centers at Juelich and Karlsruhe. In the meantime, all these facilities were shut down and most of them are now in a state of decommissioning and dismantling (D and D). Meanwhile, Germany is one of the leading countries in the world in the field of D and D. Two big demonstration plants, the Niederaichbach Nuclear Power Plant (KKN) a heavy-water cooled pressure tube reactor with carbon-dioxide cooling and the Karlstein Superheated Steam Reactor (HDR) a boiling light water reactor with a thermal power of 100 MW, are totally dismantled and 'green field' is reached. For two other projects the return to 'green field' sites will be reached by the end of this decade. These are the dismantling of the Multi-Purpose Research Reactor (MZFR) and the Compact Sodium Cooled Reactor (KNK) both located at the Forschungszentrum Karlsruhe. Within these projects a lot of new solutions und innovative techniques were tested, which were developed at German universities and in small and medium sized companies mostly funded by the Federal Ministry of Education and Research (BMBF). For example, high performance underwater cutting technologies like plasma arc cutting and contact arc metal cutting. (authors)

  20. The federal monitoring process and LTC providers. An overview of the role of federal surveyors and their work with state agencies and long-term care facilities.

    PubMed

    Kelso, K M; Dymon, H D

    1989-06-01

    In summary, the federal monitoring process was not intended to be adversarial. Rather, it was designed to improve state survey agency performance. It is important for all to understand and cooperate with each other in the monitoring process to improve patient care and maintain compliance with federal regulatory requirements.

  1. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... designed to meet the standards identified in the document entitled “Interagency Security Committee Security Design Criteria for New Federal Office Buildings and Major Modernization Projects,” dated May 28, 2001. The security design criteria for new facilities takes into consideration technology developments,...

  2. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designed to meet the standards identified in the document entitled “Interagency Security Committee Security Design Criteria for New Federal Office Buildings and Major Modernization Projects,” dated May 28, 2001. The security design criteria for new facilities takes into consideration technology developments,...

  3. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... designed to meet the standards identified in the document entitled “Interagency Security Committee Security Design Criteria for New Federal Office Buildings and Major Modernization Projects,” dated May 28, 2001. The security design criteria for new facilities takes into consideration technology developments,...

  4. Which School Districts Qualified for Federal School Facility Funding under the American Recovery and Reinvestment Act of 2009? Evidence from Ohio

    ERIC Educational Resources Information Center

    Ingle, W. Kyle; Bowers, Alex J.; Davis, Thomas E.

    2014-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) allocated $11 billion per year for 2009 and 2010 for qualified school construction bonds (QSCBs) for America's schools. From a historical perspective, this program is a broad transformation of the federal role in school facility funding. This study examined factors associated with federal…

  5. ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  6. Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA

  7. Small Hydroelectric Power Plan Demonstration Project

    NASA Astrophysics Data System (ADS)

    The Rocky Mountain Biological Laboratory has completed construction of a small scale hydroelectric power plant. The plant utilizes water from the Laboratory's domestic water supply, can generate a maximum of 7.5 kW, and supplies electricity to the Laboratory's dining hall for space heat, cooking, and hot water.

  8. Hydroelectric redevelopment maintains heritage values

    SciTech Connect

    Bulkovshteyn, L.; Chidiac, M.; Hall, W.

    1995-12-31

    The Seymour GS is an 80 year old generating station on the historic Trent-Severn Waterway in Ontario, Canada. The rehabilitation at Seymour was approved by Provincial and Federal authorities on condition that the original appearance of the building be maintained. The capacity of the Generating Station (GS) is being uprated from 3.15 MW to 5.7 MW, by replacing five vertical double runner Francis units with five horizontal Kaplan turbines. The replacement of vertical Francis units with horizontal Kaplan units, necessitated an extensive and innovative demolition approach for the substructure modification. The new turbines required a powerhouse base slab 3.5 m below the grade of the original slab. This required removal of the existing slabs and foundation rock along with most of the interior powerhouse walls. The type of modification and demolition were carefully chosen to accommodate a very tight schedule dictated by the requirement of the Federal Department of Fisheries and Oceans (DFO), where in-water work is restricted to certain months of the year.

  9. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    SciTech Connect

    Cada, G.F.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in Indiana

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Indiana are examined. The Federal government also exercises extensive regulatory authority in the area. An examination is made of the Federal-state relationships with the aim of creating a more orderly understanding of the vagaries of the system. The introductory chapter examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The Indiana water law; direct and indirect regulations; the Public Service Commission of Indiana; and financial considerations are examined.

  11. Status of downstream fish passage at hydroelectric projects in the northeast, USA

    USGS Publications Warehouse

    Odeh, Mufeed; Orvis, Curtis

    1997-01-01

    In the northeastern United States several guidance, protection, and conveyance methods have been employed to assist downstream migrating fish. Overlay racks, standard bar racks with close spacing, louvers, curtain walls, guide walls, netting, and other means have been used to guide and protect fish from entrainment. The design process of these facilities comprises consideration of various factors, including flow approach, attraction flow, guidance and protection devices, bypass location, conveyance mechanism, and plunge pool conditions. This paper presents the status of the design criteria for downstream fish passage facilities at hydroelectric sites in the northeast part of the United States. Examples of existing facilities are given.

  12. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal...

  13. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal...

  14. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal...

  15. Program management assessment of Federal Facility Compliance Agreement regarding CAA-40 C.F.R. Part 61, Subpart H at the Los Alamos National Laboratory

    SciTech Connect

    1997-01-01

    An assessment of Los Alamos National Laboratory`s management system related to facility compliance with an element of the Clean Air Act was performed under contract by a team from Northern Arizona University. More specifically, a Federal Facilities Compliance Agreement (FFCA) was established in 1996 to bring the Laboratory into compliance with emissions standards of radionuclides, commonly referred to as Rad/NESHAP. In the fall of 1996, the four-person team of experienced environmental managers evaluated the adequacy of relevant management systems to implement the FFCA provisions. The assessment process utilized multiple procedures including document review, personnel interviews and re-interviews, and facility observations. The management system assessment was completed with a meeting among team members, Laboratory officials and others on November 1, 1996 and preparation of an assessment report.

  16. Environmental requirements at hydroelectric power plants

    SciTech Connect

    Cada, G.F.; Francfort, J.E.

    1993-12-31

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour.

  17. S. 1462: This Act may be cited as the Federal Nuclear Facilities Environmental Response Act. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, August 1, 1989

    SciTech Connect

    Not Available

    1989-01-01

    S. 1462 is a bill to create a Federal nuclear facility environmental response fund, to create and Office of Environmental Management and Remedial Action, to require the Secretary of Energy and the Administrator of the Environmental Protection Agency to cooperate with affected States and Indian tribes, to provide for research and development to address environmental problems at Federal nuclear facilities, and for other purposes. The basic purpose of the act is to provide and adequate, long-term source of funding for environmental restoration, decontamination, decommissioning, and management of Federal nuclear facilities and sites.

  18. Federal water policy

    SciTech Connect

    Not Available

    1990-01-01

    The Federal Water Policy is a statement of the federal government's philosophy and goals for the nation's freshwater resources, and of the proposed ways of achieving them in cooperation with provincial governments. This document provides an overview of the policy, then presents details on the policy itself, the strategies for achievement of that policy, methods of applying it, and specific policy statements. These statements cover such topics as the management of toxic chemicals, water quality, ground water contamination, municipal water and sewer infrastructure, safe drinking water, wetlands preservation, hydroelectric development, navigation, native water rights, and Canada-US boundary management, among others.

  19. Legal obstacles and incentives to the development of small-scale hydroelectric power in Rhode Island

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Rhode Island, any private rights in the flowing waters of a river or stream depend upon ownership of the abutting land. It appears Rhode Island follows the reasonable use theory of riparian law. The Department of Environmental Management is the most significant administrative agency with regard to dam construction, alteration, and operation in the state of Rhode Island.

  20. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  1. Legal obstacles and incentives to the development of small scale hydroelectric potential in Illinois

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of the hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The first obstacle which every developer in Illinois must confront is obtaining authority to utilize the river bed, banks, and flowing water at the proposed site. This involves determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Illinois follows the riparian theory of water law. Following the detailed discussion of the water law, direct and indirect regulations and financial considerations are discussed.

  2. Legal obstacles and incentives to the development of small scale hydroelectric potential in Wisconsin

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The initial obstacle that all developers confront in Wisconsin is obtaining the authority to utilize the bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Wisconsin follows the riparian theory of water law.

  3. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  4. Implementation plan for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-06-01

    Plans and schedules for meeting the Federal Facility Agreement (FFA) commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL) were initially submitted in ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. The information presented in the current document summarizes the progress that has been made to date and provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present the plans and schedules associated with the remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. A comprehensive program is under way at ORNL to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be submitted to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation (EPA/TDEC) as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. The plans and schedules for implementing the FFA compliance program that were originally submitted in ES/ER-17&D 1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste tanks Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee, are updated in the present document. Chapter I provides general background information and philosophies that lead to the plans and schedules that appear in Chaps. 2 through 5.

  5. Implementation Plan for Liquid Low-Level Radioactive Waste tank systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-09-01

    This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the Federal Facility Agreement (FFA) commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). These commitments were initially submitted in ES/ER-17&Dl, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. The plans and schedules for implementing the FFA compliance program that were submitted in ES/ER-17&Dl, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste tanks Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee, are updated in this document. Chapter 1 provides general background information and philosophies that lead to the plans and schedules that appear in Chaps. 2 through 5.

  6. Impacts of proposed RCRA regulations and other related federal environmental regulations on Fossil Fuel-Fired Facilities: Final report, Volume 1

    SciTech Connect

    Not Available

    1987-03-01

    In order to fulfill its responsibilities, DOE contracted with Engineering-Science to perform a multi-phase engineering and economics study to evaluate the impact of the proposed RCRA regulations and other related federal environmental regulations on coal-fired utilities. This Interim Phase I report presents the findings of the impacts of proposed RCRA and related federal regulations on the utility sector fossil fuel-fired facilities. Subsequent phases involve parallel engineering studies on the industrial sector as well as economic evaluations. The framework of this study was based on the development and analysis (engineering and economic) of four regulatory scenarios for the disposal of fly ash, bottom ash and FGD sludge from the utility industry.

  7. Forced response analysis of hydroelectric systems

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Silva, P. C. O.; Béguin, A.; Kawkabani, B.; Allenbach, P.; Nicolet, C.; Avellan, F.

    2014-03-01

    At off-design operating points, Francis turbines develop cavitation vortex rope in the draft tube which may interact with the hydraulic system. Risk resonance assessment by means of eigenmodes computation of the system is usually performed. However, the system response to the excitation source induced by the cavitation vortex rope is not predicted in terms of amplitudes and phase. Only eigenmodes shapes with related frequencies and dampings can be predicted. Besides this modal analysis, the risk resonance assessment can be completed by a forced response analysis. This method allows identifying the contribution of each eigenmode into the system response which depends on the system boundary conditions and the excitation source location. In this paper, a forced response analysis of a Francis turbine hydroelectric power plant including hydraulic system, rotating train, electrical system and control devices is performed. First, the general methodology of the forced response analysis is presented and validated with time domain simulations. Then, analysis of electrical, hydraulic and hydroelectric systems are performed and compared to analyse the influence of control structures on pressure fluctuations induced by cavitation vortex rope.

  8. Carbon emission from global hydroelectric reservoirs revisited.

    PubMed

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  9. Carbon emission from global hydroelectric reservoirs revisited.

    PubMed

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs. PMID:24943886

  10. PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  11. 7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO THE LEFT, NORTH ELEVATION OF OFFICE BUILDING TO THE RIGHT, VIEW TO THE EAST. CONCRETE 'PATH' IN FOREGROUND IS THE CONDUIT THROUGH WHICH POWER CABLES RUN FROM THE TRANSFORMERS TO THE 115 KV SUBSTATION. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  12. Implementation plan for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    SciTech Connect

    1995-06-01

    This document is an annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. Chapter 1 provides general background information and philosophies that lead to the plans and schedules that appear in Chapters 2 through 5.

  13. Implementation plan for liquid low-level radioactive waste tank systems for fiscal year 1995 at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    SciTech Connect

    1995-06-01

    This document is the third annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW System as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. Chapter 1 provides general background information and philosophies that led to the plans and schedules that appear in Chaps. 2 through 5.

  14. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  15. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    SciTech Connect

    O'Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  17. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  18. An Analysis of Dissolved Oxygen Concentrations in Tail Waters of Hydroelectric Dams and the Implications for Small-Scale Hydropower Development

    NASA Astrophysics Data System (ADS)

    Cada, Glenn F.; Kumar, K. D.; Solomon, Jean A.; Hildebrand, Stephen G.

    1983-08-01

    One of the environmental issues affecting small-scale hydropower development in the United States is water quality degradation. The extent of this potential problem, as exemplified by low dissolved oxygen concentrations in reservoir tail waters, was analyzed by pairing operating hydroelectric sites with dissolved oxygen measurements from nearby downstream U.S. Geological Survey water quality stations. These data were used to calculate probabilities of noncompliance (PNC's), that is, the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. The continental states were grouped into eight regions based on geographic and climatic similarities. Most regions had higher mean PNC's in summer than in winter, and summer PNC's were greater for large-scale than for small-scale hydropower facilities. Cumulative probability distributions of PNC also indicated that low dissolved oxygen concentrations in the tail waters of operating hydroelectric dams are phenomena largely confined to sites with large-scale facilities.

  19. Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

  20. A developer's guide to small-scale hydroelectric development in the southeast

    NASA Astrophysics Data System (ADS)

    Day, S.; Grant, H.; Paukert, J.; Hagler, G.; Cousineau, C.

    1982-06-01

    Precise information is provided to small scale hydroelectric developers on the federal and state permitting processes in the eight states of Region IV of US Department of Energy, i.e., Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee. The procedures for each permit are described in the text and flow charts are provided at the end of each chapter. Information is also included on state financing and taxation incentives which may apply to small hydro and on the public Utility Policies Act as it applies to small hydro.

  1. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    SciTech Connect

    Hosking, H.

    1984-09-01

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  2. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1993-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Field Office (DOE-OR), the US Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section 9 and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review or approval. The initial issue of this document in March 1992 transmitted to EPA/TDEC those plans and schedules that were required within 60 to 90 days of the FFA effective date. The current revision of this document updates the plans, schedules, and strategy for achieving compliance with the FFA, and it summarizes the progress that has been made over the past year. Chapter 1 describes the history and operation of the ORNL LLLW System, the objectives of the FFA, the organization that has been established to bring the system into compliance, and the plans for achieving compliance. Chapters 2 through 7 of this report contain the updated plans and schedules for meeting FFA requirements. This document will continue to be periodically reassessed and refined to reflect newly developed information and progress.

  3. An Assessment of Drinking-Water Supplies on the Hanford Site: An Evaluation Conducted at a Federal Nuclear Facility in Southeastern Washington State

    SciTech Connect

    Hanf, Robert W; Kelly, Lynn M

    2005-03-01

    Drinking water is supplied to most U.S. Department of Energy (DOE) facilities on the Hanford Site by DOE-owned, contractor-operated pumping and distribution systems. Water is primarily obtained from the Columbia River, but some facilities use water obtained from onsite groundwater wells. Because of the large amount of stored radioactive and chemical waste at Hanford, and the approximately 1,400 waste disposal locations, there is some concern that remaining waste materials are contaminating onsite drinking water supplies. This paper describes the drinking water systems and treatment requirements on the Hanford Site and summarizes radiological and non-radiological water quality data obtained from water samples collected from drinking water systems in use in 2001 and 2002. Monitoring data show that Hanford-produced radionuclides are measurable in some drinking water samples. The only non-radiological contaminants detected were either byproducts of the chlorination process or from offsite agricultural activities. Values of all contaminants were, in all cases, below state and federal annual average drinking water limits. This information will provide assurance to current employees and future site developers that drinking water on the Hanford Site is safe for public consumption.

  4. Report on siphon penstocks for hydroelectric projects

    SciTech Connect

    Not Available

    1989-02-01

    This report on the use of siphon penstocks for hydroelectric installations has been prepared under DOE Contract DE-AC07-82ID12356 by Acres International Corporation and draws extensively on the information and data assembled by the following organizations: The purpose of the study was to review the design, construction, operation, and maintenance considerations for siphon penstocks. The discussions, data, and information presented are based on experiences with the following operational siphon penstock plants: A general description of siphon penstocks is presented in Section 2. The benefits and drawbacks of siphon penstocks are summarized in Section 3. Sections 4, 5, 6, and 7 contain a review of the design, construction, operation, and maintenance considerations. The comparative costs of siphon penstocks versus conventional designs are discussed in Section 8. Recommendations for future design, based on the experiences with the above listed projects, are presented in Section 9. Section 10 contains the conclusions which have been made from the review of siphon penstock installations.

  5. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    SciTech Connect

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  6. Pollution prevention opportunity assessments of US Army Corps of Engineers Civil Works Facilities

    SciTech Connect

    1995-08-01

    This project summary describes three Pollution Prevention Opportunity Assessments conducted at US Army Corps of Engineers Civil Works facilities under the Waste Reduction Evaluations at Federal Sites (WREAFS) Program. The purposes of the WREAFS Program are to identify new technologies and techniques for reducing wastes from industrial processes at Federal sites, and to enhance the implementation of pollution prevention through technology transfer. New techniques and technologies for reducing waste generation are identified through pollution prevention opportunity assessments (PPOA) and may be further evaluated through joint research, development, and demonstration projects. The assessments were conducted using the procedures outlined in EPA`s Facility Pollution Prevention Guide. The assessments had two major phases. The first phase quantified waste generation and management practices. The second phase identified and evaluated the feasibility of opportunities and techniques to eliminate, reduce, or recycle wastes. The facilities studied in the PPOAs were: a navigation lock and dam; a warehouse and a maintenance and repair facility; a hydroelectric power plant; and a flood control dam and reservoir with associated public recreation areas. Other Federal agencies, such as the Bureau of Reclamation and the Tennessee Valley Authority have similar functions and facilities, as do states and the private sector. Thus, the results of the PPOAs described in the three full reports have applicability to a broad audience.

  7. Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

    SciTech Connect

    Hildebrand, S.G.

    1980-08-01

    The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

  8. Controlling zebra mussel infestations at hydroelectric plants

    SciTech Connect

    Sblendorio, R.P.; Malinchock, J.C. ); Claudi, R. )

    1991-07-01

    U.S. and Canadian utilities in the great lakes area have adopted techniques to temporarily prevent infestation of the zebra mussel in their hydro facilities, but are still looking for more permanent solutions.

  9. Joint Industry/University Cooperation with Federally Supported Research Facilities. Hearing before the Subcommittee on Investigations and Oversight of the Committee on Science and Technology. U.S. House of Representatives, Ninety-Eighth Congress, First Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Committee on Science and Technology.

    These hearings focused on issues related to the joint use of federally-funded research facilities by industry and universities. Testimony of witnesses, prepared statements, and supporting documentation (including the Stevenson-Wydler Technology Innovation Act of 1980, Public Law 96-480) are provided. Witnesses presenting testimony included: Louis…

  10. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement.

  11. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement.

  12. Impact of High Wind Power Penetration on Hydroelectric Unit Operations

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-01-01

    The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

  13. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  14. Legal obstacles and incentives to the development of small scale hydroelectric power in New Hampshire

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step any developer must take is that of acquiring the real estate parcel. The step involves acquisition in some manner of both river banks, the river bed, and where necessary the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important for only a use of water by a riparian owner is deemed a reasonable use and hence legal. Apart from acquisition by sale, lease, or gift, New Hampshire law permits a number of other methods. In part use of these methods will depend on whether the developer is the state, a municipality, a private corporation, or a public utility. Provided the developer avails himself of the five (5) megawatts exemption, his main regulatory agency will be the Water Resources Board. However, the state is not free from the problems of legal uncertainty inherent in determinations of reasonableness.

  15. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  16. Legal obstacles and incentives to the development of small-scale hydroelectric power in Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Virginia are described. The state regulatory system does not comprise final authority; the Federal government also exercises extensive regulatory authority in the area. This dual system is a function of the federalist nature of our government. The introductory section examines the dual system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and inquires into the practical use of the doctrine by the FERC. The use of a natural-surface watercourse in Virginia is governed generally by the doctrine of riparian rights. Riparian rights is a system of water rights based on ownership of land bordering on a natural stream or watercourse. For land to be considered riparian to a stream, that land must be located on the watershed of that portion of the stream. The theory of riparian rights followed in Virginia is one of reasonable use. Under the reasonable-use doctrine, each riparian owner has an equal right to the reasonable use of the water running naturally through or by his land for any useful purpose. The water must continue to run after such use without material diminution or alteration and without pollution.

  17. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  18. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  19. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Cooper Hydroelectric Project On May 26 and November 8, 2011, Commission staff met with representatives of...), licensee for the Santee-Cooper Hydroelectric Project No. 199, to discuss what is needed to complete...

  20. MEASUREMENT AND CALCULATION OF RADIONUCLIDE ACTIVITIES IN SAVANNAH RIVER SITE HIGH LEVEL WASTE SLUDGE FOR ACCEPTANCE OF DEFENSE WASTE PROCESSING FACILITY GLASS IN A FEDERAL REPOSITORY

    SciTech Connect

    Bannochie, C; David Diprete, D; Ned Bibler, N

    2008-12-31

    This paper describes the results of the analyses of High Level Waste (HLW) sludge slurry samples and of the calculations necessary to decay the radionuclides to meet the reporting requirement in the Waste Acceptance Product Specifications (WAPS) [1]. The concentrations of 45 radionuclides were measured. The results of these analyses provide input for radioactive decay calculations used to project the radionuclide inventory at the specified index years, 2015 and 3115. This information is necessary to complete the Production Records at Savannah River Site's Defense Waste Processing Facility (DWPF) so that the final glass product resulting from Macrobatch 5 (MB5) can eventually be submitted to a Federal Repository. Five of the necessary input radionuclides for the decay calculations could not be measured directly due to their low concentrations and/or analytical interferences. These isotopes are Nb-93m, Pd-107, Cd-113m, Cs-135, and Cm-248. Methods for calculating these species from concentrations of appropriate other radionuclides will be discussed. Also the average age of the MB5 HLW had to be calculated from decay of Sr-90 in order to predict the initial concentration of Nb-93m. As a result of the measurements and calculations, thirty-one WAPS reportable radioactive isotopes were identified for MB5. The total activity of MB5 sludge solids will decrease from 1.6E+04 {micro}Ci (1 {micro}Ci = 3.7E+04 Bq) per gram of total solids in 2008 to 2.3E+01 {micro}Ci per gram of total solids in 3115, a decrease of approximately 700 fold. Finally, evidence will be given for the low observed concentrations of the radionuclides Tc-99, I-129, and Sm-151 in the HLW sludges. These radionuclides were reduced in the MB5 sludge slurry to a fraction of their expected production levels due to SRS processing conditions.

  1. Risk of solid cancer in the offspring of female workers of the Mayak nuclear facility in the Southern Urals, Russian Federation.

    PubMed

    Tsareva, Y; Deltour, I; Sokolnikov, M; Okatenko, P; Vostrotin, V V; Schonfeld, S J; Schüz, J

    2016-08-01

    Studies of cancer risk following in utero exposure to ionizing radiation are limited in number, particularly for adult-onset cancers, and the evidence is unclear. In the present study, the risk of solid cancer incidence following in utero radiation exposure is examined among 8466 offspring of female nuclear workers at one of the largest nuclear facilities (Mayak Production Association) in the Russian Federation. Poisson regression methods were used to estimate excess relative risks (ERRs) per Gray (Gy). Mother's uterine gamma dose served as a surrogate for fetal gamma dose. During 277,002 person-years of follow-up (1948-2009), there were 177 first primary solid cancers excluding non-melanoma skin cancers. Estimated in utero gamma and plutonium doses exceeded zero for 41 and 23 % of offspring, respectively. Of the 177 solid cancers, 66 occurred among individuals with some in utero exposure to gamma radiation and 53 among those with estimated plutonium exposures. There was no indication of a statistically significantly increased risk of solid cancer incidence from in utero gamma exposure (linear ERR/Gy -1.0; upper 95 % confidence limit 0.5). This result was unchanged after accounting for subsequent occupational exposure. Plutonium doses were estimated but were too low to obtain meaningful risk estimates. Thus, in this cohort in utero radiation exposure was not associated with solid cancer risk. This is consistent with an earlier report of mortality in the cohort, but is based on twice as many cases and less susceptible to biases inherent in mortality analyses. Given the relatively young age of the cohort with respect to cancer, continued follow-up should be done as the number of cancer cases increases.

  2. Risk of solid cancer in the offspring of female workers of the Mayak nuclear facility in the Southern Urals, Russian Federation.

    PubMed

    Tsareva, Y; Deltour, I; Sokolnikov, M; Okatenko, P; Vostrotin, V V; Schonfeld, S J; Schüz, J

    2016-08-01

    Studies of cancer risk following in utero exposure to ionizing radiation are limited in number, particularly for adult-onset cancers, and the evidence is unclear. In the present study, the risk of solid cancer incidence following in utero radiation exposure is examined among 8466 offspring of female nuclear workers at one of the largest nuclear facilities (Mayak Production Association) in the Russian Federation. Poisson regression methods were used to estimate excess relative risks (ERRs) per Gray (Gy). Mother's uterine gamma dose served as a surrogate for fetal gamma dose. During 277,002 person-years of follow-up (1948-2009), there were 177 first primary solid cancers excluding non-melanoma skin cancers. Estimated in utero gamma and plutonium doses exceeded zero for 41 and 23 % of offspring, respectively. Of the 177 solid cancers, 66 occurred among individuals with some in utero exposure to gamma radiation and 53 among those with estimated plutonium exposures. There was no indication of a statistically significantly increased risk of solid cancer incidence from in utero gamma exposure (linear ERR/Gy -1.0; upper 95 % confidence limit 0.5). This result was unchanged after accounting for subsequent occupational exposure. Plutonium doses were estimated but were too low to obtain meaningful risk estimates. Thus, in this cohort in utero radiation exposure was not associated with solid cancer risk. This is consistent with an earlier report of mortality in the cohort, but is based on twice as many cases and less susceptible to biases inherent in mortality analyses. Given the relatively young age of the cohort with respect to cancer, continued follow-up should be done as the number of cancer cases increases. PMID:27056719

  3. US Department of Energy`s Federal Facility Compliance Act Chief Financial Officer`s Report to Congress for fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Federal Facility Compliance Act of 1992 (FFCAct) (Public Law 102-386) was enacted into law on October 6, 1992. In addition to amending the Resource Conservation and Recovery Act (RCRA), the FFCAct requires the US Department of Energy (DOE) to prepare an annual report from the Chief Financial Officer to the Congress on compliance activities undertaken by the DOE with regard to mixed waste streams and provide an accounting of the fines and penalties imposed upon the DOE for violations involving mixed waste. This document has been prepared to report the necessary information. Mixed waste is defined by the FFCAct to include those wastes containing both hazardous waste as defined in the RCRA and source, special nuclear, or byproduct material subject to the Atomic Energy Act of 1954, as amended (42 U.S.C. Section 2001 et seq.). Section 2 of this report briefly summarizes DOE Headquarters` activities conducted during Fiscal Year 1993 (FY 1993) to comply with the requirements of the FFCAct. Section 3 of this report provides an overview of the site-specific RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generated or store mixed waste that are subject to regulation under RCRA. Section 4 provides information on notifications of alleged RCRA violations involving mixed waste imposed upon the DOE during FY 1993 and an accounting of any fines and penalties associated with these violations. Appendix A provides site-specific summaries of RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generate or store mixed waste that are subject to regulation under RCRA.

  4. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    NASA Astrophysics Data System (ADS)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  5. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... Energy Regulatory Commission Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project... that could be affected by issuance of a new license for the Otter Creek Hydroelectric Project No. 2558..., as applicant for the Otter Creek Hydroelectric Project, has expressed an interest in this...

  6. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for... Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric Project....

  7. 26 CFR 1.141-7 - Special rules for output facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... transmission networks promulgated by the Federal Energy Regulatory Commission (FERC). For example, for a... example, cost of coal or gas). For example, the available output of a hydroelectric unit must...

  8. 26 CFR 1.141-7 - Special rules for output facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... transmission networks promulgated by the Federal Energy Regulatory Commission (FERC). For example, for a... example, cost of coal or gas). For example, the available output of a hydroelectric unit must...

  9. 26 CFR 1.141-7 - Special rules for output facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... transmission networks promulgated by the Federal Energy Regulatory Commission (FERC). For example, for a... example, cost of coal or gas). For example, the available output of a hydroelectric unit must...

  10. 26 CFR 1.141-7 - Special rules for output facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... transmission networks promulgated by the Federal Energy Regulatory Commission (FERC). For example, for a... example, cost of coal or gas). For example, the available output of a hydroelectric unit must...

  11. Climate change impacts on high-elevation hydroelectricity in California

    NASA Astrophysics Data System (ADS)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  12. Hydroelectric power in Hawaii. A report on the statewide survey of potential hydroelectric sites

    SciTech Connect

    Beck, C. A.

    1981-02-01

    An assessment was made of the hydropower potential in Hawaii. The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 MW of potential generating capacity. Combined with the 18 MW of existing hydropower capacity, hydropower resources potentially could generate about 307 million kWh of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands, Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%, on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. A summary of existing and future (potential) hydropower capacities and estimated annual outputs for each island is presented. How much of the potential capacity is being actively considered for development and how much is only tentatively proposed at the time is indicated. The economics of hydropower at specific sites were analyzed. The major conclusion of this analysis is that hydropower development costs vary widely among the different sites, but that generally the cost of hydroelectric power is either less than or comparable to the cost of oil-fired power.

  13. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  14. Policymaking and politics in an independent commission: Environmental policy in the FERC hydroelectric licensing program

    NASA Astrophysics Data System (ADS)

    Spence, David B.

    This work addresses the question of how effectively elected politicians can exert influence over the policy choices of regulatory agencies. I use environmental policy decisions made by the Federal Energy Regulatory Commission ("FERC") in its hydroelectric licensing program to test several competing hypotheses from the political control literature. I find, among other things, that: (1) politicians have used the tools of political control to effect noticeable but marginal changes in the content of FERC decisions over time; (2) the FERC has used its retained decision-making and procedural discretion strategically to minimize the both the effects of political controls and the influence of environmental group intervenors over agency decisions; and (3) FERC decisions remained relatively consistent over time in the face of repeated attempts by others to pull it toward a more pro-environment position.

  15. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... security requirements with public building environments that remain lively, open, and accessible. ... Design Criteria for New Federal Office Buildings and Major Modernization Projects,” dated May 28,...

  16. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... security requirements with public building environments that remain lively, open, and accessible. ... Design Criteria for New Federal Office Buildings and Major Modernization Projects,” dated May 28,...

  17. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    NASA Astrophysics Data System (ADS)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  18. Small scale hydroelectric development and the environment: issues, challenge, and opportunity

    SciTech Connect

    Hildebrand, S. G.

    1980-01-01

    A small scale hydroelectric (SSH) facility is defined as an existing dam that can be retrofitted to produce 25 MW or less capacity. An estimate of the total SSH potential in the United States indicates there are 4979 sites with 8775 MW capacity and 25,126 GWh average annual energy. This represents approximately 1% of existing total installed electrical capacity from all sources in the US. Some of the major environmental issues that must be analyzed to determine potential for adverse impact at SSH sites include dredging, fish passage, water level fluctuation, and instream (minimum) flow. Each of these issues is discussed. It is concluded that development of the SSH resource represents a good energy investment and that the attributes of renewable energy and the emphasis on existing dams as opposed to new dam construction are positive features from the environmental standpoint. (LCL)

  19. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  20. 18 CFR 2.19 - State and Federal comprehensive plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... comprehensive plans. 2.19 Section 2.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of General...) In determining whether the proposed hydroelectric project is best adapted to a comprehensive...

  1. 18 CFR 2.19 - State and Federal comprehensive plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... comprehensive plans. 2.19 Section 2.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of General...) In determining whether the proposed hydroelectric project is best adapted to a comprehensive...

  2. 18 CFR 2.19 - State and Federal comprehensive plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... comprehensive plans. 2.19 Section 2.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of General...) In determining whether the proposed hydroelectric project is best adapted to a comprehensive...

  3. 18 CFR 2.19 - State and Federal comprehensive plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... comprehensive plans. 2.19 Section 2.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of General...) In determining whether the proposed hydroelectric project is best adapted to a comprehensive...

  4. 18 CFR 2.19 - State and Federal comprehensive plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... comprehensive plans. 2.19 Section 2.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements of General...) In determining whether the proposed hydroelectric project is best adapted to a comprehensive...

  5. Hydroelectric power in Hawaii: a reconnaissance survey

    SciTech Connect

    1981-02-01

    The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 megawatts of potential generating capacity. Combined with the 18 megawatts of existing hydropower capacity, hydropower resources potentially could generate about 307 million kilowatt-hours of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands - Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%; on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. Existing and future (potential) hydropower capacities are summarized, and annual outputs for each island are estimated. Future hydropower facilities are subdivided into two categories, which show how much of the potential capacity is being actively considered for development, and how much is only tentatively proposed at the time.

  6. DOI criticized for failing to inventory hazardous waste sites on federal lands

    SciTech Connect

    1993-11-01

    The Department of the Interior (DOI) manages approximately 440 million acres of public land across the United States, including national parks and forests, wildlife refuges, fish hatcheries, and water and hydroelectric projects. At these facilities, hazardous wastes are commonly generated through such activities as oil and gas drilling, coal mining, hydroelectric plant operation, and pesticide application. Consequently, a significant number of DOI sites are probably contaminated and thus must be identified, assessed, and remediated. 2 refs., 1 tab.

  7. Model documentation report: Short-Term Hydroelectric Generation Model

    SciTech Connect

    Not Available

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration`s (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook.

  8. Net energy of seven small-scale hydroelectric power plants

    NASA Astrophysics Data System (ADS)

    Gilliland, M. W.; Klopatek, J. M.; Hildebrand, S. G.

    1981-07-01

    The net energy results are expressed as the ratio of energy output to energy input. Two ratios were developed. In the first (R1), the energy output, expressed as electrically, was divided by the energy subsidy; in the second (R2), the energy output, expressed as the fossil fuel equivalent of electricity, was divided by the energy input. The results indicate that the energy output from the seven plants is 8.6 to 32.9 times greater than the energy input for the R1 case, and 26.3 to 101.4 times greater than the energy input for the R2 case. On the net energy criterion, the small scale plants are better than conventional peak load hydroelectric plants and similar to conventional base load hydroelectric plants.

  9. Financing of private small scale hydroelectric projects

    SciTech Connect

    Smukler, L.M.

    1981-03-01

    This manual is a description of the financing process associated with the private development of SSH projects. It examines the institutional framework and the actors within that framework who will have vital impact upon the potential for success of a project. The manual describes the information a developer should obtain in order to make intelligent decisions concerning the multiple directions in which project development can proceed. This information should assist the developer in formulating a business plan. Factors to be considered in choosing a business organizational form are discussed. Included is an analysis of the federal income tax factors relevant to SSH in context of the treatment of specific items: business expenses, depreciation, the Investment Tax Credit, and the Energy Tax Credit as modified by COWPTA. In addition, the tax and organizational factors are applied to an analysis of two mechanisms which can lower development costs through maximum utilization of available tax benefits: limited partnerships and leveraged leases. The manual lists and analyzes the major sources of debt and equity financing that are potentially available to a developer. Finally, all the previously discussed pieces are put together and how the decisions relating to such factors as marketing, taxation and debt financing interrelate to determine the probable success and profitability of a project are investigated. Furthermore, this part of the manual will provide an illustrated guide to understanding the financing process, leading the reader through the decisionmaking and negotiation points, and highlighting what should be borne in mind, what a developer may be giving up and what the perspective of other key actors will be at those points.

  10. Short-term hydroelectric generation model. Model documentation report

    SciTech Connect

    1996-12-01

    The purpose of this report is to define the objectives of the Energy Information Administration`s (EIA) Short-Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the EIA`s legal obligation to provide adequate documentation in support of its models.

  11. Shawmut hydroelectric redevelopment project. Final technical and construction cost report

    SciTech Connect

    1982-08-01

    This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

  12. 75 FR 35786 - White River Minimum Flows-Addendum to Final Determination of Federal and Non-Federal Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... prices it is using to value the Ozark Beach hydroelectric facility lost energy. This would be calculated... price of energy is approximately $10 per MWh factored up to $12.50 per MWh for the loss of an in-state.... Comment. ``SWPA should include a $12.50 per MWH adder escalating at 2.1% per year to Platt's energy...

  13. Geologic factors pertinent to the proposed A. J. Wiley Hydroelectric Project No. 2845, Bliss, Idaho

    USGS Publications Warehouse

    Malde, Harold E.

    1981-01-01

    The A.J. Wiley Hydroelectric Project is a proposal by the Idaho Power Company to develop hydroelectricity near Bliss, Idaho, by building a dam on the Snake River (fig. 1). The proposed dam would impound a narrow reservoir as deep as 85 feet in a free-flowing reach of the river that extends from the upper reach of water impounded by the Bliss Dam to the foot of the Lower Salmon Falls Dam, nearly 8 miles farther upstream. The proposed dam would be built in three sections: a spillway section and a powerhouse (intake) section to be constructed of concrete in the right-handed part, and an embankment section to be constructed as a zoned-fill of selected earth materials in the left-hand part. (Right and left are to be understood in the sense of looking downstream.) In August, 1979, the Idaho Power Company was granted a 3-year permit (Project No. 2845) by the Federal Energy Regulatory Commission (FERC) to make site investigations and environmental studies in the project area. A year later, on August 26, 1980, the company applied to FERC for a license to construct the project. On October 8, 1980, as explained in a letter by William W. Lindsay, Director of the Office of Electric Power Regulation, the company was given 90 days to correct certain deficiencies in the application. Because several of the deficiencies identified by Mr. Lindsay pertain to geologic aspects of the project, his letter is attached to this report as Appendix A. Hereafter in this report, the deficiencies listed by Mr. Lindsay are identified by the numerical entries in his letter. The Idaho Power Company is referred to as the applicant.

  14. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    SciTech Connect

    Not Available

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  15. Hydroelectricity, sustainability, and the role of probabilistic inflow forecasting

    NASA Astrophysics Data System (ADS)

    Sharma, Ashish; Mehrotra, Raj

    2014-05-01

    Hydroelectricity is one of the oldest energy options known to mankind. While public perceptions of hydroelectricity have had their ups and downs, there is growing consensus that it offers one of the most sustainable options to energy reliability, as well as one of the most cost-effective one. This talk focusses on the factors leading to loss of efficiency due to uncertainty in energy demands and reservoir inflows. The talk formulates the need for probabilistic forecasts of demand and inflow, and presents the obstacles in formulating such forecasts due to the complexities of the climate system. A case is made for the use of ensemble forecasts, in this case formulated using statistical alternatives assuming global sea surface temperatures as a key source of information content. A newly formulated approach for identifying nonlinear dependence between variables (termed as the Partial information - Partial Weight, or PI-PW approach, see Sharma and Mehrotra (2014) for details), and subsequent use of these variables to formulate a probabilistic forecasting model is then presented, a key feature of this model being the lack of any major assumption in the nature of dependence (or variables) being modelled. The talk concludes with a list of challenges that still need overcoming, in ensuring hydroelectricity continues to be considered as a key sustainable energy alternative as we head into times of growing disparity between energy resource and consumption. Reference: Sharma, A., and R. Mehrotra (2014), An information theoretic alternative to model a natural system using observational information alone, Water Resources Research, 49, doi:10.1002/2013WR013845.

  16. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  17. 40 CFR 62.13 - Federal plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Federal plans. 62.13 Section 62.13... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS General Provisions § 62.13 Federal plans. The Federal plans apply to owners and operators of affected facilities that are not covered by an...

  18. 40 CFR 62.13 - Federal plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Federal plans. 62.13 Section 62.13... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS General Provisions § 62.13 Federal plans. The Federal plans apply to owners and operators of affected facilities that are not covered by an...

  19. Integration of hydroelectric power and apiary management. Final report

    SciTech Connect

    Mitchell, C.

    1983-06-19

    Appropriate Technology Grant 3-80-342 is an attempt to integrate hydroelectric power with apiary management. The biggest challenge to the efficient completion of the project was connecting with the appropriate technology and associated personel to guide the project. Most of the so called ''experts'' in this field are at an early experimental stage in technology and knowledge. The existing system is capable of generating ample electricity six to seven months out of the year. The unit was operating consistantly near the end of winter. At present, it is not running due to lack of sufficient water.

  20. (Feasibility study of the San Lorenzo River hydroelectric project)

    SciTech Connect

    Chronowski, R.A.

    1990-07-19

    I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.