Science.gov

Sample records for federal hydroelectric facilities

  1. Hydroelectric Generating Facilities General Permit ...

    EPA Pesticide Factsheets

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  2. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1995 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Graves, Richie J.; Langeslay, Michael J.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams.

  3. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2000 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean

    2001-05-01

    2000 was the third season in the Smolt Monitoring Facility (SMF) at John Day Dam. Despite the continued presence of the NMFS The Dalles Dam spillway survival study, and a higher target number of study fish, sample numbers were down form 1999. Additionally, the average sample rate this year (25%) was nearly twice the average rate in 1999, (13%). Spill, expressed as a percent of river flow, was up slightly this year, about 3% in the spring and 8% through the summer and fall, which accounts for some of the decline in sample numbers. The largest declines in sample numbers were for yearling and subyearling chinook and wild sockeye. Descaling and mortality rates were very low for all species, the highest descaling was 11.2% for hatchery sockeye. River flow was lower than last year, debris was light, dissolved gas levels were generally below the Oregon and Washington water quality standards, and overall, migration conditions were good. Passage duration was generally similar to last year but timing varied considerably, depending on species. PIT tag detections were down to 41,848 from 138,705 the previous year. Increased spill passage is the likely explanation for the large decline. The Separation by Code component of the system was utilized by three different studies. At Bonneville Dam, index level sampling was transferred from the first powerhouse to the second powerhouse and occurred at the new Hamilton Island Juvenile Monitoring Facility. An estimated 2.7 million fish passed through the bypass system, 54,051 of which were sampled in the new facility. The location and method differ so much from previous years that comparisons are pointless. River conditions were similar to those described for John Day Dam; lower than in 1999, moderate debris, manageable gas levels, and normal temperatures. Passage timing and duration was very similar to last year for the chinook and steelhead but the coho migration started later and ended earlier, and sockeye were just the opposite

  4. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2003 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2004-02-01

    The 2003 spring flows were within 7 kcfs of last year's flows, but the summer flows were significantly lower, averaging 194 kcfs compared to 278 kcfs last year. Late summer and fall flows were within 20 kcfs of last year's flows. These flow levels provided good migration conditions for juvenile salmonids, comparable to last year, except in June and July. Monthly average river flows were lower than the historical averages. The number of fish handled at John Day decreased from 257,741 last year to 166,209 this year. Part of this decline is due to reduced research effort which lowers the total number of fish needed. Descaling, compared to last year, varied by species, increasing for yearling chinook and clipped and unclipped steelhead, decreasing for coho and sockeye, and remaining about the same for subyearling chinook. Descaling was well below the average for the airlift years for all species except unclipped steelhead. This may be a function of unclipped hatchery steelhead being counted as unclipped steelhead, a category traditionally reserved for wild steelhead. Mortality continues to be low, at or below last year's levels for yearling chinook, subyearling chinook, clipped steelhead and sockeye; slightly higher than last year for unclipped steelhead and coho. With the exception of sockeye, mortality rates at the new facility are well below the average for the years of sampling with the airlift system. The spring migrants generally started migrating later and finished earlier, for a shorter overall duration. Sub-yearling chinook did just the opposite, starting earlier and ending later for a longer middle 80% duration. This was the fourth year of index level sampling at the Hamilton Island Juvenile Monitoring Facility at Bonneville. The number of fish handled declined from 85,552 last year to 80,303 this year. Descaling for all species was similar to the previous two years (within 2%) but in all cases lower than the historical average. Mortality was lower than last

  5. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2004-2005 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2005-02-02

    yearling Chinook and unclipped steelhead runs took longer to pass Bonneville than any previous year, at 44 and 45 days, respectively. For subyearling Chinook, the middle 80% of the fish passed during the last three weeks of June and the first week of July, taking 35 days to pass the project, the same as last year. Descaling for all species was slightly higher than the average of the last five years. Compared to last year, descaling varied by species, increasing for yearling Chinook, coho, and sockeye and lower for subyearling Chinook and steelhead. Since sampling began in the juvenile monitoring facility, descaling has been quite consistent, staying below 3.6% for yearling and subyearling Chinook, unclipped steelhead and coho, and above 4.7% for clipped steelhead and sockeye. Mortality was slightly higher than last year and the historical average for yearling and subyearling Chinook and steelhead. Coho and sockeye mortality was lower than last year and the historical average. Mortality for all species was below 1%. Powerhouse 2 operational priority and research results showing higher survival of fish passing through the PH1 turbines rather than through the bypass system resulted in a complete disuse of the PH1 bypass system. Consequently, we removed the historic PH1 data from this report and refer readers to any prior report for information regarding first powerhouse fish sampling.

  6. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  7. Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.

    SciTech Connect

    Noyes, J.H.

    1986-02-01

    Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

  8. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    SciTech Connect

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  9. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  10. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  11. 5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  12. 15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT TO RIGHT AND POWERHOUSE TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  13. 2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  14. 11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT WITH INTAKE TRASH RACK AT WATER LINE AND SWITCH GEAR ON TOP - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  15. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  16. 1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  17. 2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  18. 3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  19. Federal financial assistance for hydroelectric power

    SciTech Connect

    Not Available

    1980-09-01

    The Rural Energy Initiative seeks to maximize the effectiveness of Federal programs in developing certain energy resources, including small-scale hydropower. The REI target is to arrange financing for 100 hydro sites by 1981, with about 300 MWe of additional capacity. The REI financial assistance programs for small hydropower development in the US DOE; Economic Development Administration; REA; HUD; Farmers Home Administration; DOI; DOL's CETA programs; and the Community Services Administration are described. (MCW)

  20. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect

    Auer, N.A.

    1996-01-01

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  1. Small-scale hydroelectric demonstration project: Reactivation of the Elk Rapids Hydroelectric Facility: Final operation and maintenance report

    SciTech Connect

    Miller, R.G.

    1987-03-01

    Information related to the reactivation of the Elk River Hydroelectric Power facility is reported. This report includes a history of the power plant, pertinent cost data, emergency action plans, inspections and testing, warranty work, operating problems, project data, monthly production data, and monthly operating and maintenance costs. 15 figs., 3 tabs.

  2. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    SciTech Connect

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  3. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... Energy Regulatory Commission Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1... Soliciting Comments and Motions To Intervene On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric...; Christine M. Miller, Brown Bear Power LLC, 200 Clarendon Street 55th Floor, Boston MA 02116, (617) 531- 6338...

  4. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  5. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  6. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  7. Federal legal obstacles and incentives to the development of the small-scale hydroelectric potential of the nineteen Northeastern states. Executive summary

    SciTech Connect

    None,

    1980-05-01

    The main report for which this report is the executive summary, DOE/RA--23-216.00.0-01 (see EAPA 5:3929), was published in revised form in March 1979. Also, since that time, Energy Law Institute has produced detailed legal memoranda on obstacles and incentives for each of the 19 states. This executive summary summarizes the findings and observations of the original report. Specific summaries included are: Federal Jurisdiction Over Small-Scale Hydroelectric Facilities; The FERC; The Regulation of Construction in and the Discharge of Dredged, Fill, and Other Materials into the Waters of the US; The Protection of Fish, Wildlife, and Endangered Species; The Preservation of Historic Places, Archaeological Sites, and Natural Areas; Regulation of the Use of Federal Lands; Federal Dam Construction and Power-Distribution Agencies; Additional Federal Agencies Concerned with Small-Scale Hydroelectric Dams; Federal Tax Devices and Business Structures Affecting Small-Scale Hydroelectric Development; and an Outline of Federal-Assistance programs Available for Small-Scale Hydroelectric Development.

  8. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  9. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  10. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  11. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  12. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... Energy Regulatory Commission Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice... No.: 2790-055. c. Date Filed: July 6, 2010. d. Applicant: Boott Hydropower, Inc. and Eldred L Field... Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681-1900 Ext 809. i. FERC...

  13. Engineering and Design: Lifeline Report No. 1, Systems at Risk From Earthquakes, Hydroelectric Power Plant Facilities

    DTIC Science & Technology

    2007-11-02

    and facilities required for continued operation of critical project functions . Lifelines include those facilities essential in providing: (1...1 Missouri River Omaha Nebraska and Missouri 100,000 South Dakota Green Peter 3 North Pacific Portland Oregon S. Santiam 100,000 Greers Ferry 2B...of a major earthquake. The vulnerability of this lifeline function was assessed by a walk-through of three Corps hydroelectric power plants by a team

  14. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  15. Oil Pollution Act (OPA) and Federal Facilities

    EPA Pesticide Factsheets

    The Oil Pollution Prevention regulation sets forth requirements for prevention of, preparedness for, and response to oil discharges at specific non-transportation-related facilities, including federal facilities.

  16. Enforcement and Compliance at Federal Facilities

    EPA Pesticide Factsheets

    Guide for complying with environmental laws and regulations at Federal Facilities This resource updates EPA's The Yellow Book: Guide to Environmental Enforcement and Compliance in Federal Facilities published in 1999.

  17. Federal Facility Agreement progress report

    SciTech Connect

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  18. Federal Facilities (Executive Offices) Sector (NAICS 921110)

    EPA Pesticide Factsheets

    Find EPA regulatory information for federal facilities (NAICS 92), including information on base closures and transfers, hazardous waste, military munitions, perchorlate, environmentally preferable purchasing and comprehensive procurement guidelines

  19. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  20. Environmental liability for federal lands and facilities

    SciTech Connect

    Davis, R.C. Jr.; McCrum, R.T.

    1991-12-31

    This article reviews the legal and factual basis for the federal government`s environmental liability for its lands and facilities. The first focus is the government`s liability for the public lands administered by the US DOE since 1849 upon which government authorized mining, oil and gas development and other industrial activities have been authorized. The second focus is the liabilities associated with other federal facilities and installations, particularly those administered by US DOD and US DOE and their predecessor agencies.

  1. Federal Spending on PK-12 School Facilities

    ERIC Educational Resources Information Center

    Filardo, Mary; O'Donnell, Sean

    2010-01-01

    Methodology: There is no national source of data or information on the federal role in funding and oversight for public PK-12 school facilities. To address this shortcoming, 21st Century School Fund has prepared this study with the support of the National Clearinghouse for Educational Facilities. In collecting data and information for this report,…

  2. 40 CFR 35.2127 - Federal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2127 Federal facilities. Grant assistance shall not be provided for costs to transport or treat wastewater produced by a facility.... (Approved by the Office of Management and Budget under control number 2040-0027)...

  3. 40 CFR 35.2127 - Federal facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2127 Federal facilities. Grant assistance shall not be provided for costs to transport or treat wastewater produced by a facility.... (Approved by the Office of Management and Budget under control number 2040-0027)...

  4. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  5. 76 FR 44655 - Transfer of Federally Assisted Land or Facility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... TRANSPORTATION Federal Transit Administration Transfer of Federally Assisted Land or Facility AGENCY: Federal... Federally assisted land or facility. SUMMARY: Section 5334(h) of the Federal Transit Laws, as codified, 49 U... authorize a recipient of FTA funds to transfer land or a facility to a public body for any public purpose...

  6. 25 CFR 31.2 - Use of Federal school facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Use of Federal school facilities. 31.2 Section 31.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION FEDERAL SCHOOLS FOR INDIANS § 31.2 Use of Federal school facilities. Federal Indian school facilities may be used for community...

  7. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Federal research facilities. 2.37... AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each Federal research facility shall establish an Institutional Animal Care and Use Committee which shall have the same...

  8. FEDFacts: Information about the Federal Electronic Docket Facilities

    EPA Pesticide Factsheets

    Cleanup status information related to Federal Facilities contained in EPA's Federal Agency Hazardous Waste Compliance Docket. Information includes maps, lists of facilities, dashboard view with graphs, links to community resources, and news items.

  9. Support services for commercialization of small hydroelectric facilities in North Carolina

    SciTech Connect

    Warren, J.L.

    1980-06-01

    Small hydro is defined as those hydroelectric resources available at existing sites with a potential capacity of less than 25,000 kW, or 25 MW. There is no limitation on the height of the dam. North Carolina has between 3000 and 4000 dams. Section II reviews the assessment of the small hydro resource available in North Carolina with different data sources. Section III details the assistance given to small hydro developers in North Carolina. Section IV summarizes recommendations for future activities in support of small hydro in North Carolina. Appendices include a list of existing and potential hydroelectric sites in North Carolina, a computerized list of power potentials at existing dams in North Carolina, a list of parties interested in small hydro, a sample letter sent to small hydro developers, and the program for a small hydro conference held in Asheville in 1979.

  10. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each Federal...

  11. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each Federal...

  12. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Research Facilities § 2.37 Federal research facilities. Each Federal...

  13. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  14. Behavior and passage of silver-phase American eels, Anguilla rostrata (LeSueur), at a small hydroelectric facility

    USGS Publications Warehouse

    Haro, Alex; Castro-Santos, Ted; Boubée, Jacques

    2000-01-01

    Downstream migrant eels were monitored near a small (51 MW) hydroelectric facility on the Connecticut River (Massachusetts, USA) for two seasons using acoustic and radio telemetry. Eels frequently made several attempts over periods of one to several days to pass the station. Did activity of eels was variable, although most movements occurred at night. Eels occupied a variety of depths in the forebay area, but spent the greater proportion of time at or near the bottom (10 m), occasionally venturing to the surface. Horizontal movements usually spanned across the entire width of the forebay. There was no significant relationship between duration of forebay presence and either flow or light intensity. Although all telemetered eels passed via the turbines, some migrant eels did use a surface bypass.

  15. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  16. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Federal control of port facilities. Sec. 3 Section 3... RESTRICTIONS UPON THE TRANSFER OR CHANGE IN USE OR IN TERMS GOVERNING UTILIZATION OF PORT FACILITIES Sec. 3 Federal control of port facilities. During any period when the provisions of this part are in effect the...

  17. Federal facilities compliance act waste management

    SciTech Connect

    Bowers, J; Gates-Anderson, D; Hollister, R; Painter, S

    1999-07-06

    Site Treatment Plans (STPs) developed through the Federal Facilities Compliance Act pose many technical and administrative challenges. Legacy wastes managed under these plans require Land Disposal Restriction (LDR) compliance through treatment and ultimate disposal. Although capacity has been defined for most of the Department of Energy wastes, many waste streams require further characterization and many need additional treatment and handling beyond LDR criteria to be able to dispose of the waste. At Lawrence Livermore National Laboratory (LLNL), the Hazardous Waste Management Division has developed a comprehensive Legacy Waste Program. The program directs work to manage low level and mixed wastes to ensure compliance with nuclear facility rules and its STP. This paper provides a survey of work conducted on these wastes at LLNL. They include commercial waste treatment and disposal, diverse forms of characterization, inventory maintenance and reporting, on-site treatment, and treatability studies. These activities are conducted in an integrated fashion to meet schedules defined in the STP. The processes managing wastes are dynamic due to required integration of administrative, regulatory, and technical concerns spanning the gamut to insure safe proper disposal.

  18. Resource Conservation and Recovery Act (RCRA) and Federal Facilities

    EPA Pesticide Factsheets

    Federal facilities have responsibilities with hazardous waste under RCRA, including the generation, transportation, treatment, storage, and disposal under the Resource Conservation and Recovery Act (RCRA). .

  19. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  20. EPA Policy for Innovative Environmental Technologies at Federal Facilities

    EPA Pesticide Factsheets

    This is a memo from the EPA Administrator, regarding the unique opportunities for the development and application of innovative technologies and approaches to pollution prevention, source control, site investigation, and remediation at Federal facilities.

  1. Guidance: Coordination of Federal Facility Enforcement Actions with OECA

    EPA Pesticide Factsheets

    Memorandum from OECA AA, reaffirming the importance of Regional notification to the Federal Facilities Enforcement Office (FFEO) of any proposed enforcement actions so that those actions can be coordinated with Headquarters.

  2. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  3. Transmittal of the Policy Towards Landowners and Transferees of Federal Facilities

    EPA Pesticide Factsheets

    This memorandum transmits EPA's 'Policy Towards Landowners and Transferees of Federal Facilities,' which addresses potential liability concerns of landowners and transferees who acquire Federal facility property.

  4. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1991 Annual Report.

    SciTech Connect

    Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.

  5. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1998 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    1999-03-01

    Project 84-014 has been part of the annual integrated and coordinated Columbia River Basin Smolt Monitoring Program since 1984, and currently addresses measure 5.9A.1 of the 1994 Northwest Power Planning Council's (NPPC) Fish and Wildlife Program. This report presents results from the 1998 smolt monitoring at John Day and Bonneville dams and represents the fifteenth annual report under this project.

  6. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2001 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Ballinger, Dean; Kovalchuk, Gregory M.

    2002-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration.

  7. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1997 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Mills, Robert B.

    1998-06-01

    All juvenile fish numbers, sample, collection, and index were down almost 50% from the previous year at John Day Dam (JDA). At Bonneville Dam, sample numbers increased while collection and index numbers stayed about the same. The following report presents results from the 1997 smolt monitoring at John Day and Bonneville dams and represents the fourteenth annual report under this project. The report also contains summaries of data for all years of the program at John Day and Bonneville dams in Appendices C and D.

  8. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1993 Annual Report.

    SciTech Connect

    Wood, Lynette A.; Graves, Ritchie J.; Killins, Susan D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis.

  9. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1992 Annual Report.

    SciTech Connect

    Hawkes, Lynnette A.; Martinson, Rick D.; Absolon, Randall F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC`s Fish Passage Data System (FPDS).

  10. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1989 Annual Report.

    SciTech Connect

    Johnsen, Richard C.

    1990-02-19

    This project is a part of the continuing Smolt Monitoring Program (SMP) to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC). The SMP provides timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis by the FPC for travel time, relative magnitude and timing of the smolt migration. Sampling sites were McNary, John Day and Bonneville Dams under the SMP, and the Dalles Dam under the Fish Spill Memorandum of Agreement'' for 1989. All pertinent fish capture, condition and brand data, as well as dam operations and river flow data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 15 refs., 6 figs., 6 tabs.

  11. Monitoring of Downstream Salmon and Steelhead Trout at Federal Hydroelectric Facilities, 1985 Annual Report.

    SciTech Connect

    Johnsen, Richard C.; Ranck, Carol L.

    1985-11-01

    Juvenile salmonids were monitored on their seaward migration at three key sites on the Snake-Columbia River system by the National Marine Fisheries Service (NMFS). This was a part of the total monitoring effort in the Water Budget Center's (WBC) smolt monitoring program on Columbia Basin salmonid stocks. In addition to the three key sites, the NMFS also initiated a sampling effort at bower Monumental Dam. Funding was provided by the Bonneville Power Administration (BPA). The major sampling sites were at Lower Granite, McNary, and John Day Dams: sampling at these sites provided data primarily for evaluation of smolt survival, travel time, and migrational timing as required by the WBC. At bower Monumental Dam catch data was to provide a general indication of smolt passage and comparison with the hydroacoustics passage index as determined by Bio-Sonics of Seattle, WA. To achieve these goals it was necessary to monitor and index salmonid smolt passage at the three major sites. This involved: (1) the systematic sampling of the smolt migration from 27 March to 23 July at bower Granite Dam, 29 March to 26 September at McNary Dam, 28 March to 1 April, 20-22 April, and 27 April to 29 October at John Day Dam; (2) recovering and recording brands; (3) providing the WBC with a daily index of smolt passage at bower Granite and McNary Dams and daily sample numbers at John Day Dam; and (4) providing the WBC with daily summaries of brand recapture data. Daily catch and brand recapture data from Lower Monumental Dam was reported to the WBC as required during the sampling season, 23 May through 9 July.

  12. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2005-2006 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean

    2006-04-01

    2005 was an average to below average flow year at John Day and Bonneville Dams. A large increase in flow in May improved migration conditions for that peak passage month. Spill was provided April through August and averaged about 30% and 48% of river flow at John Day and Bonneville Dams, respectively. Water temperature graphs were added this year that show slightly lower than average water temperature at John Day and slightly higher than average temperatures at Bonneville. The number of fish handled at John Day decreased from 412,797 in 2004 to 195,293 this year. Of the 195,293 fish, 120,586 (61.7%) were collected for researchers. Last year, 356,237 (86.3%) of the fish sampled were for researchers. This dramatic decline is the result of (1) fewer research fish needed (2) a smaller, lighter tag which allowed for tagging of smaller fish, and (3) a larger average size for subyearling chinook. These factors combined to reduce the average sample rate to 10.8%, about half of last year's rate of 18.5%. Passage timing at John Day was similar to previous years, but the pattern was distinguished by larger than average passage peaks for spring migrants, especially sockeye. The large spike in mid May for sockeye created a very short middle 80% passage duration of just 16 days. Other spring migrants also benefited from the large increase in flow in May. Descaling was lower than last year for all species except subyearling chinook and below the historical average for all species. Conversely, the incidence of about 90% of the other condition factors increased. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, less than 1% for all species. On 6 April a slide gate was left closed at John Day and 718 fish were killed. A gate position indicator light was installed to prevent reoccurrences. Also added this year was a PIT tag detector on the adult return-to-river flume. For the first time this year, we successfully held Pacific lamprey ammocetes. The number of fish sampled at Bonneville Dam was also down this year to 260,742, from 444,580 last year. Reasons for the decline are the same as stated above for John Day. Passage timing at Bonneville Dam was quite similar to previous years with one notable exception, sockeye. Sockeye passage was dominated by two large spikes in late May that greatly condensed the passage pattern, with the middle 80% passing Bonneville in just 18 days. Unlike John Day, passage for the rest of the species was well disbursed from late April through early June. Fish condition was good, with reductions in descaling rates for all species except unclipped steelhead and sockeye. Sockeye mortality matched last year's rate but was considerably lower for all other species. Rare species sampled at Bonneville this year included a bull trout and a eulachon.

  13. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1990 Annual Report.

    SciTech Connect

    Hawkes, Lynette A.

    1991-03-01

    The seaward migration of salmonid smolts was monitored by the National Marine Fisheries Service (NMFS) at three sites on the Columbia River system in 1990. This project is a part of the continuing Smolt Monitoring Program to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Indian Tribes. It's purpose is to provide timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis for travel time, relative magnitude and timing and the smolt migration. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the Smolt Monitoring program, and the Dallas Dam under the Fish Spill Memorandum of Agreement'' for 1990. All pertinent fish capture, condition and brand data, as well as dam operations and river flow data were reported daily to FPC. These data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 10 refs., 8 figs., 1 tab.

  14. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2002 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Ballinger, Dean; Kamps, Jeffrey W.

    2003-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River. The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to monitor the timing and magnitude of the juvenile salmonid out-migration in the Columbia Basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time and survival estimates and to build a time series data set for future reference. The purpose of the PSMFC portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville dams.

  15. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1996 Annual Report.

    SciTech Connect

    Martinson, Rick D.; Kamps, Jeffrey W.; Graves, Ritchie J.

    1997-08-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1996 The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville Dams. Monitoring data collected included: river conditions; total numbers of fish; numbers of fry, adult salmon, and incidental catch; daily and seasonal passage patterns; and fish condition. 10 refs., 16 figs., 5 tabs.

  16. 77 FR 5502 - Stuyvesant Falls Hydroelectric Project; Notice of Application Ready for Environmental Analysis...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Federal Energy Regulatory Commission Stuyvesant Falls Hydroelectric Project; Notice of Application Ready..., New York. e. Name of Project: Stuyvesant Falls Hydroelectric Project. f. Location: On Kinderhook Creek... environmental analysis. l. The existing Stuyvesant Falls Hydroelectric Project is currently being restored...

  17. Integrating SOPs and air quality regulatory requirements at federal facilities

    SciTech Connect

    Rasmussen, S.

    1997-12-31

    While for many years it has been perceived that federal facilities have fewer environmental requirements and restrictions than industry, in fact they are now faced with more compliance requirements than most private sector sources. In addition to federal programs now applicable to federal facilities under the Federal Clean Air Act for example, federal facilities also are challenged with requirements driven by their own agencies. The Air Force Material Command (AFMC) in particular, has an aggressive program to standardize operations and compliance with Standard Operating Procedures (SOP) for air quality. In some cases, these SOP`s are more onerous than Environmental Protection Agency (EPA) programs, and in some instances, the requirements may take different approaches. In this paper, the authors will explore the challenges faced by federal facilities, with a case example of Hill Air Force Base, as they develop ways to comply with both. Specific example of how to develop an integrated program will be examined. At Hill AFB, the goal in the Air Quality Program has been Efficiency and Compliance. Where requirements overlap, one compliance program is developed and implemented. In cases where requirements differ, compliance methods are developed and proposed to both agencies for resolution. By integrating these programs, bases such as Hill AFB can be complaint and efficient.

  18. Federal Agency Liability under the Superfund Act: It Goes Beyond Federal Facilities

    SciTech Connect

    Raymond Takashi Swenson

    2004-02-01

    While many readers of the Federal Facilities Environmental Journal are involved with the performance of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup on Department of Defense and Department of Energy facilities, many may be unfamiliar with the much broader CERCLA liability of federal agencies under other circumstances. This article places the various kinds of federal agency CERCLA liability into that wider context and serves as a lessons learned for environmental managers who want to avoid creating new CERCLA liability for their agencies.

  19. Advances in technology transfer at Federal Facilities

    SciTech Connect

    Silva, R.R. Jr.

    1994-11-01

    The Hanford Site, located in the southeast portion of the state of Washington, is a 1450-hectare (560 square miles) reservation that was selected by the US Government in 1942 for production of the world`s first nuclear weapons materials. For more than 40 years, defense production operations at Hanford generated hazardous and radioactive materials and wastes that for the most part remain there today. Environmental restoration of the Hanford Site is the primary mission of the Westinghouse Hanford Company (WHC) and it is also the thrust of the Tri-Party agreement among the US Environmental Protection Agency, the Washington State Department of Ecology and the US Department of Energy. Restoration will require treatment of about 1400 individual locations that are contaminated by chemically hazardous wastes, radioactive wastes, non-hazardous wastes and mixed hazardous and radioactive wastes. These locations include burial sites, storage facilities, obsolete buildings, settling ponds, waste cribs and large and small areas of near-surface and deep soil contamination. Burial trenches contain an estimated 109,000 cubic meters of low-level solid wastes contaminated with hazardous chemicals and radioactive materials. Approximately 450 sites were contaminated by discharge of liquids to the ground and there are about 250 additional areas where waste materials were spilled. At one time, ditches carried water from processing plants to settling/cooling ponds and 131 cribs were used over the years to dispose of slightly radioactive liquid wastes.

  20. S. 549: A Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This document contains S.549, a Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. This bill was introduced in the Senate of the United States, 104th Congress, First session, March 14, 1995.

  1. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  2. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  3. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... agencies' responsibilities concerning seismic safety in Federal facilities? 102-80.45 Section 102-80.45... Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning seismic safety in Federal facilities? Federal agencies must follow the standards issued by the...

  4. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  5. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  6. PROCESS AND EQUIPMENT CHANGES FOR CLEANER PRODUCTION IN FEDERAL FACILITIES

    EPA Science Inventory

    The paper discusses process and equipment changes for cleaner production in federal facilities. During the 1990s, DoD and EPA conducted joint research and development, aimed at reducing the discharge of hazardous and toxic pollutants from military production and maintenance faci...

  7. PROCESS AND EQUIPMENT CHANGES FOR CLEANER PRODUCTION IN FEDERAL FACILITIES

    EPA Science Inventory

    The paper discusses process and equipment changes for cleaner production in federal facilities. During the 1990s, DoD and EPA conducted joint research and development, aimed at reducing the discharge of hazardous and toxic pollutants from military production and maintenance faci...

  8. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... may be necessary to meet the requirements of the national security. Control shall be consistent with... 46 Shipping 8 2013-10-01 2013-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS...

  9. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... may be necessary to meet the requirements of the national security. Control shall be consistent with... 46 Shipping 8 2014-10-01 2014-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS...

  10. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... may be necessary to meet the requirements of the national security. Control shall be consistent with... 46 Shipping 8 2010-10-01 2010-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS...

  11. 46 CFR Sec. 3 - Federal control of port facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... may be necessary to meet the requirements of the national security. Control shall be consistent with... 46 Shipping 8 2012-10-01 2012-10-01 false Federal control of port facilities. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS...

  12. Remedy Selection and Land Use at Federal Facilities

    EPA Pesticide Factsheets

    Analysis of approximately 98 percent of the interim and final source control Records of Decision signed at Federal Facilities on the NPL from the beginning of Superfund through August 1995. PB96-963309. EPA/540/R-96/020. August 1996

  13. 9 CFR 2.37 - Federal research facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Federal research facilities. 2.37 Section 2.37 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF... exceptions to inspection protocol....

  14. Administrative, counseling and medical practices in National Abortion Federation facilities.

    PubMed

    Landy, U; Lewit, S

    1982-01-01

    A survey of members of the National Abortion Federation (NAF), most of them non-hospital facilities, responsible for performing almost half of the abortions in the United States, was carried out by the NAF in 1981. Among the principal findings were the following: Fifty-three percent of the NAF facilities are freestanding clinics operated for profit. Fifty-one percent are open more than 50 hours per week, and 77 percent are open six days a week; 86 percent are open on Saturdays. Seventy-five percent of the physicians performing abortions in these facilities are gynecologists. Counseling provided by specially trained abortion counselors is a unique contribution of abortion facilities to health-care delivery. Virtually all facilities employ counselors who are neither doctors nor nurses. Most NAF facilities have more counselors than nurses and more nurses than doctors. Counseling in virtually all facilities includes providing written as well as verbal information about the nature of the procedure and its medical risks; such information is given to the patient so that she can give informed consent for the abortion. Almost all facilities include information about contraception and about the options available to a woman with a problem pregnancy. Most offer counseling to the male, as well as the female partner, on the patient's request. Twenty-eight percent of facilities generally provide both individual and group counseling. Where only one type of counseling is provided, it is usually individual counseling.(ABSTRACT TRUNCATED AT 250 WORDS)

  15. [Twenty-year surveillance of insects relevant to public health during the construction of hydroelectric facilities in Antioquia, Colombia].

    PubMed

    Zuluaga, Walter Alonso; López, Yolanda Lucía; Osorio, Lisardo; Salazar, Luis Fernando; González, Marta Claudia; Ríos, Claudia María; Wolff, Marta Isabel; Escobar, José Pablo

    2012-09-01

    Entomological studies conducted in large hydroelectric infrastructure projects are a tool for the prevention and control of vector-borne diseases. These diseases emerge as a consequence of changes made to the terrain that often increase the natural and artificial mosquito larval habitats. Many of these insects are of public health importance and population increases result in an increased risk of disease transmission. The culicine (mosquito) and phlebotomine (sand fly) populations were characterized in the area of the Porce II and Porce III hydroelectric projects of Antioquia between 1990 to 2009. Periodical entomological samplings were made in the area of impact, in the workers camps, and construction sites. Adult specimens were captured with nets, Shannon light traps, CDC light traps, and protected human bait. Mosquito larvae of the following species were identified: Culex coronator, Culex nigripalpus, Culex corniger, Culex quinquefasciatus and Limatus durhami. The most frequently identifiers of larval habitats were low tanks, waste cans, tires, and aquatic plants. Aedes aegypti specimens were captured in only two rural locations from two municipalities within the area of influence. Specimens from the following mosquito genera were captured in forest areas: Aedes, Mansonia, Culex, Psorophora, Wyeomyia, Phonyomyia, Uranotaenia, Haemagogus and Sabethes. The most important mosquito found was Haemogogus janthinomis, an efficient yellow fever vector in Colombia. The area has been endemic for leishmaniasis and in the current study, 20 species of Lutzomyia sand flies, potential vectors, were identified. Among malaria vectors, the most important species found in the area were Anopheles nuneztovari and Anopheles pseudopunctipennis. A wide variety of vectors were discovered in the area of the Porce II and Porce III hydroelectric projects, and many of these were relevant for public health. Further monitoring will be necessary to minimize disease transmission risks among the

  16. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  17. Renewable energy for federal facilities serving native Americans: preprint

    SciTech Connect

    Eiffert, P.; Sprunt Crawley, A.; Bartow, K.

    2000-05-15

    The Federal Energy Management Program (FEMP) in the U.S. Department of Energy (DOE) is targeting Federal facilities serving Native American populations for cost-effective renewable energy projects. These projects not only save energy and money, they also provide economic opportunities for the Native Americans who assist in producing, installing, operating, or maintaining the renewable energy systems obtained for the facilities. The systems include solar heating, solar electric (photovoltaic or PV), wind, biomass, and geothermal energy systems. In fiscal years 1998 and 1999, FEMP co-funded seven such projects, working with the Indian Health Service in the U.S. Department of Health and Human Services, the Bureau of Indian Affairs in the U.S. Department of the Interior, and their project partners. The new renewable energy systems are helping to save money that would otherwise be spent on conventional energy and reduce the greenhouse gases associated with burning fossil fuels.

  18. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    SciTech Connect

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  19. Implementing Water Conservation Goals at Federal Facilities: Lessons Learned

    SciTech Connect

    Tanner, S.; Braver, D.

    2001-12-01

    Executive Order 13123 (June 1999) directed Federal agencies to improve water-use efficiency at government-owned facilities. The order required agencies to determine their water consumption and establish a goal for reducing it. Under the leadership of the Department of Energy's Federal Energy Management Program (FEMP) and National Renewal Energy Laboratory (NREL), representatives from several agencies established a working group to recommend guidelines and methods for improving water efficiency. Some agencies were already implementing effective conservation measures. However, many agencies lacked ways to determine how much water they were using or what it cost. In 1999, FEMP established methods agencies can use to identify baseline water usage and set reasonable water efficiency improvement goals. As a result, 10 Best Management Practices (BMPs), similar to those established by the California Urban Water Conservation Council, were developed for Federal water efficiency. The Federal BMPs focus on office water use, landscaping, heating and cooling, leak detection, and education. They emphasize flexibility, cost-effectiveness, and creativity. This paper describes these methods for determining baseline usage, selecting appropriate BMPs for a facility, and meeting efficiency goals. It also includes lessons learned throughout the process.

  20. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On April 4, 2013, Lakeport Hydroelectric Associates and Lakeport Hydroelectric...

  1. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must evaluate facilities to comply with GSA's safety and environmental program and applicable Federal, State and local environmental laws and regulations. Federal agencies should conduct these evaluations in... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility...

  2. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must evaluate facilities to comply with GSA's safety and environmental program and applicable Federal, State and local environmental laws and regulations. Federal agencies should conduct these evaluations in... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility...

  3. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must evaluate facilities to comply with GSA's safety and environmental program and applicable Federal, State and local environmental laws and regulations. Federal agencies should conduct these evaluations in... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility...

  4. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must evaluate facilities to comply with GSA's safety and environmental program and applicable Federal, State and local environmental laws and regulations. Federal agencies should conduct these evaluations in... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility...

  5. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must evaluate facilities to comply with GSA's safety and environmental program and applicable Federal, State and local environmental laws and regulations. Federal agencies should conduct these evaluations in... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility...

  6. Overview of hazardous-waste regulation at federal facilities

    SciTech Connect

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require.

  7. The munitions provisions of the Federal Facility Compliance Act

    SciTech Connect

    Kimmell, T.A.; Green, D.R.; Queen, R.

    1994-03-01

    The Federal Facility Compliance Act (FFCA) was signed by President Bush on October 6, 1992. This Act amends the Resource Conservation and Recovery Act (RCRA), the primary law governing hazardous waste management in the US The most significant provision of the FFCA was the waiver of sovereign immunity. This waiver subjects Federal facilities to the same ``incentives`` as the private sector for compliance. While the waiver has broad implications for all Federal facilities, other provisions of the FFCA impact specific sectors of the Federal complex. The focus of this paper is the FFCA Munitions Provisions, which have the potential to change some aspects of the structure of munitions management within the military. The Munitions Provisions, contained in Section 107 of the FFCA, modifies Section 3004 of RCRA by adding a new subsection (y) on Munitions. Section 107 requires the Environmental Protection Agency (EPA) to develop, after consultation with the Department of Defense (DOD) and appropriate State officials, regulations identifying when military munitions (including conventional and chemical munitions) become hazardous waste, and to provide for the safe transportation and storage of such waste. The FFCA requires EPA to promulgate the final ``Munitions Rule`` by October 6, 1994. These are the only provisions of the FFCA that require a new rulemaking. It is clear that the Munitions Rule could have a significant effect on the way in which DOD manages munitions. Demilitarization, range management, training activities, and emergency response actions may be affected. It is important for DOD, the Services, and individual installations, to be aware of potential impacts of the FFCA on munitions management operations. The purpose of this paper is to review several important munitions Rule issues, and to discuss potential impacts of these issues.

  8. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto..., 916-446-0100. c. FERC Contact: Stephen Bowler, Don Pedro Hydroelectric Project, Dispute Resolution...

  9. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project. This...

  10. 75 FR 15705 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of... the Mahoning Creek Hydroelectric Project, to be located on Mahoning Creek in Armstrong County...

  11. Consolidating federal facility cleanup: Some pros and cons

    SciTech Connect

    Raynes, D.B.; Boss, G.R. )

    1993-01-01

    It has been suggested that Congress establish a permanent, full-time, independent national commission for radioactive waste management activities at DOE's Nuclear Weapons Complex. DOE regulates certain aspects of its treatment, storage, and disposal of radioactive waste by orders that are not promulgated by notice and comment'' or other procedures in the Administration Procedures Act. Because many agencies are not legally and technologically structured to handle their own cleanup problems, these activities might be conducted by one entity that can share information and staff among these agencies. There are rational arguments for both sides of this issue. Some of the advantages of such an organization include: focusing Congress's attention on an integrated federal facility cleanup instead of a fragmented, agency by agency approach, and an ability to prioritize cleanup decisions among agencies. Some significant obstacles include: reluctance by Congress and the executive branch to create any new bureaucracy at a time of budget deficits, and a loss of momentum from the progress already being made by the agencies. Given that more than $9 billion was proposed for FY 93 alone for federal facilities' cleanup programs and that decades will pass before all problems are addressed, it is appropriate to consider new approaches to environmental cleanup. This paper begins the dialogue about new ways to improve decision-making and government spending.

  12. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Exemption to qualifying facilities from the Federal Power Act. 292.601 Section 292.601 Conservation of Power and Water Resources... Production Facilities and Cogeneration Facilities from Certain Federal and State Laws and Regulations §...

  13. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Exemption to qualifying facilities from the Federal Power Act. 292.601 Section 292.601 Conservation of Power and Water Resources... Production Facilities and Cogeneration Facilities from Certain Federal and State Laws and Regulations §...

  14. 36 CFR 1253.8 - Are NARA research room facilities closed on Federal holidays?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facilities closed on Federal holidays? 1253.8 Section 1253.8 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION PUBLIC AVAILABILITY AND USE LOCATION OF RECORDS AND HOURS OF USE § 1253.8 Are NARA research room facilities closed on Federal holidays? NARA research room facilities are...

  15. The Influence of Tag Presence on the Mortality of Juvenile Chinook Salmon Exposed to Simulated Hydroturbine Passage: Implications for Survival Estimates and Management of Hydroelectric Facilities

    SciTech Connect

    Carlson, Thomas J.; Brown, Richard S.; Stephenson, John R.; Pflugrath, Brett D.; Colotelo, Alison HA; Gingerich, Andrew J.; Benjamin, Piper L.; Langeslay, Mike; Ahmann, Martin L.; Johnson, Robert L.; Skalski, John R.; Seaburg, Adam; Townsend, Richard L.

    2012-05-01

    Each year, millions of fish have telemetry tags (acoustic, radio, inductive) surgically implanted to assess their passage and survival through hydropower facilities. One route of passage of particular concern is through hydro turbines, in which fish may be exposed to a range of potential injuries, including barotraumas from rapid decompression. The change in pressure from acclimation to exposure (nadir) has been found to be an important factor in predicting the likelihood of mortality and injury for juvenile Chinook salmon undergoing rapid decompression associated with simulated turbine passage. The presence of telemetry tags has also been shown to influence the likelihood of injury and mortality for juvenile Chinook salmon. This research investigated the likelihood of mortality and injury for juvenile Chinook salmon carrying telemetry tags and exposed to a range of simulated turbine passage. Several factors were examined as predictors of mortal injury for fish undergoing rapid decompression, and the ratio of pressure change and tag burden were determined to be the most predictive factors. As the ratio of pressure change and tag burden increase, the likelihood of mortal injury also increases. The results of this study suggest that previous survival estimates of juvenile Chinook salmon passing through hydro turbines may have been biased due to the presence of telemetry tags, and this has direct implications to the management of hydroelectric facilities. Realistic examples indicate how the bias in turbine passage survival estimates could be 20% or higher, depending on the mass of the implanted tags and the ratio of acclimation to exposure pressures. Bias would increase as the tag burden and pressure ratio increase, and have direct implications on survival estimates. It is recommended that future survival studies use the smallest telemetry tags possible to minimize the potential bias that may be associated with carrying the tag.

  16. Guidance: Use of Contract Inspectors for EPA's Federal Facility Compliance Inspections/Evaluations

    EPA Pesticide Factsheets

    This guidance clarifies that properly trained authorized and federally credentialed EPA contract inspectors can perform compliance inspections at federal facilities under the CWA, RCRA, TSCA, OPA and the SDWA.

  17. Federal Facilities Inspections: A Guide to EPA's Access and Inspection Authorities

    EPA Pesticide Factsheets

    This brochure outlines the legal authority for EPA, or one of its authorized representatives, to inspect a federal facility for compliance with environmental laws. It also identifies the federal, state, or tribal inspectors who may conduct inspections.

  18. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal agencies take to improve the utilization of parking facilities? 102-74.310 Section 102-74.310...) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.310 What measures must Federal agencies take to improve the utilization of parking facilities...

  19. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal agencies take to improve the utilization of parking facilities? 102-74.310 Section 102-74.310...) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.310 What measures must Federal agencies take to improve the utilization of parking facilities...

  20. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... the Cushman Hydroelectric Project, Mason County, Washington, Environmental Impact Statement (DOE/EIS... environmental impacts from the proposed action were analyzed in the Federal Energy Regulatory Commission's (FERC's) 1996 Final Environmental Impact Statement for the Cushman Hydroelectric Project (FERC Project...

  1. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities... employment of parking management contractors and concessionaires, where appropriate. Smoking...

  2. The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities

    SciTech Connect

    Colotelo, Alison HA; Pflugrath, Brett D.; Brown, Richard S.; Brauner, Colin J.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiqun; Ahmann, Martin L.; Trumbo, Bradly A.

    2012-10-01

    Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

  3. 77 FR 3958 - Coordination of Federal Authorizations for Electric Transmission Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ...; ] DEPARTMENT OF ENERGY 10 CFR Part 900 RIN 1901-AB18 Coordination of Federal Authorizations for Electric... Electric Transmission Facilities has been extended until February 27, 2012. DATES: DOE will accept comments... electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA). The proposed...

  4. 78 FR 59709 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... property cannot be declared excess or made available for use as facilities to assist the homeless...

  5. 77 FR 32662 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... cannot be declared excess or made available for use as facilities to assist the homeless. Properties...

  6. 78 FR 55282 - Federal Housing Administration (FHA) Healthcare Facility Documents: Notice of Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... URBAN DEVELOPMENT Federal Housing Administration (FHA) Healthcare Facility Documents: Notice of... published in the Federal Register a notice that announced that FHA's healthcare facility documents completed... concluded a 10-month process through which HUD solicited public comment to update 115 healthcare...

  7. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165 What...

  8. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165 What...

  9. 41 CFR 102-74.165 - What energy standards must Federal agencies follow for existing facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What energy standards... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.165 What...

  10. EPA FRS Facilities Combined File CSV Download for the Federated States of Micronesia

    EPA Pesticide Factsheets

    The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.

  11. Earthquake resistant construction of electric transmission and telecommunication facilities serving the Federal government report

    SciTech Connect

    Yokel, F.Y.

    1990-02-01

    The vulnerability of electrical transmission and telecommunication facilities to damage in past earthquakes, as well as available standards and technologies to protect these facilities against earthquake damage are reviewed. An overview is presented of measures taken by various Federal agencies to protect electrical transmission and telecommunication facilities against earthquake hazards. It is concluded that while most new facilities which are owned and operated by Federal agencies are presently designed to provide some, though not necessarily adequate, earthquake resistance, there generally is no effort to retrofit existing facilities. No evidence was found of requirements to protect electrical transmission and communication facilities which have major contractual obligations to serve the Federal Government and only limited seismic design requirements are stipulated for electrical transmission systems constructed with Federal funding.

  12. Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities

    SciTech Connect

    Chvala, William D.

    2001-07-31

    This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

  13. 77 FR 3915 - Federal Support for the Randolph-Sheppard Vending Facility Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... From the Federal Register Online via the Government Publishing Office ] Vol. 77 Wednesday, No. 16 January 25, 2012 Part IV The President Memorandum of January 20, 2012--Federal Support for the Randolph- Sheppard Vending Facility Program #0; #0; #0; Presidential Documents #0; #0; #0;#0;Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012...

  14. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    EPA Pesticide Factsheets

    Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC web service. Data are collected using the Superfund Enterprise Management System (SEMS) and transferred to Envirofacts for access by the public. Data about Federal facility Superfund sites are located on their own EPA web pages, and CIMC links to those pages. Links to the relevant web pages for each site are provided within the attribute table. Federal facility sites can be either Superfund sites or RCRA Corrective Action sites, or they may have moved from one program to the other and back. In Cleanups in My Community, you can map or list any of these Federal Facility sites. This data layer shows only those facilities that are Superfund Sites. RCRA federal facility sites and other Superfund NPL sites are included in other data layers as part of this web service.Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned. The CIMC web service was initially published in 2013, but the data are updated on the 18th of each month. The full schedule for data updates in CIMC is located here:

  15. State and Federal Policies for School Facility Construction: A Comparison of Michigan and Ohio

    ERIC Educational Resources Information Center

    Davis, Thomas E.

    2015-01-01

    Background: The Ohio School Facilities Commission was set up in response to litigation compelling the state to achieve a more equitable distribution in the quality of school facilities. The American Recovery and Reinvestment Act (ARRA) was a federal policy to stimulate the United States economy and support school facility construction. These two…

  16. State and Federal Policies for School Facility Construction: A Comparison of Michigan and Ohio

    ERIC Educational Resources Information Center

    Davis, Thomas E.

    2015-01-01

    Background: The Ohio School Facilities Commission was set up in response to litigation compelling the state to achieve a more equitable distribution in the quality of school facilities. The American Recovery and Reinvestment Act (ARRA) was a federal policy to stimulate the United States economy and support school facility construction. These two…

  17. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    SciTech Connect

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation

  18. 2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT WITH BRIDGE OVER CANAL SPILLWAY IN FOREGROUND AND MILL COMPLEX IN BACKGROUND - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  19. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. Scooteney Wasteway Hydroelectric...

  20. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Federal Energy Regulatory Commission White Mountain Hydroelectric Corp.; Notice of Application for... notice that the following hydroelectric application has been filed with the Commission and is available....: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of...

  1. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Federal Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary... feasibility of the Scooteney Outlet Drop Hydroelectric Project (Scooteney Outlet Project or project) to be...-hours. Applicant Contact: Mr. Ronald Rodewald, Secretary-Manager, Grand Coulee Project Hydroelectric...

  2. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. 16.4 Wasteway Hydroelectric...

  3. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. 46A Wasteway Hydroelectric...

  4. Building a hydroelectric project at a fishway

    SciTech Connect

    Bagnall, C.L. ); Haake, H.E. )

    1993-12-01

    It's not unusual to hear about a fishway being installed at a hydro facility. However, the reverse -- installing a hydro plant at an existing fish passage facility -- is unique. Northern Wasco County People's Utility District (PUD) in Oregon has proved the validity of the idea. For decades, the Pacific Northwest has relied upon hydropower as a reliable and economic means of generating electricity. In recent years, however, in the Columbia River Basin, efforts to protect diminishing salmon stocks have taken precedence over the development of new hydropower plants. With that in mind, the Northern Wasco County PUD in Oregon set out to develop a hydroelectric project that not only provided for fish passage, but also took advantage of an existing fishway. The Dalles Dam North Fishway Project began operating in 1991. The project site is a fishway at the US Army Corps of Engineers' The Dalles Lock and Dam. The 5-MW project received intense scrutiny from state and federal fishery agencies and Indian tribes. All of the parties worked together to settle differences and to develop a feasible project that meets multiple needs.

  5. 41 CFR 102-73.25 - What policies must Executive agencies comply with in locating Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Executive agencies comply with in locating Federal facilities? 102-73.25 Section 102-73.25 Public Contracts... REGULATION REAL PROPERTY 73-REAL ESTATE ACQUISITION General Provisions Locating Federal Facilities § 102-73.25 What policies must Executive agencies comply with in locating Federal facilities?...

  6. 41 CFR 102-73.25 - What policies must Executive agencies comply with in locating Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Executive agencies comply with in locating Federal facilities? 102-73.25 Section 102-73.25 Public Contracts... REGULATION REAL PROPERTY 73-REAL ESTATE ACQUISITION General Provisions Locating Federal Facilities § 102-73.25 What policies must Executive agencies comply with in locating Federal facilities?...

  7. River recreation management opportunities in hydroelectric relicensing

    Treesearch

    James R. Bernier

    1992-01-01

    Between now and 1993, more than 200 existing hydroelectric projects will come up for relicensing before FERC, the Federal Energy Regulatory Commission. This provides a rare opportunity for agencies and individuals to markedly influence the ecological and recreational balance of these projects. This paper presents an overview of the relicensing process, describes some...

  8. 75 FR 60777 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...; NASA: Mr. Frank Bellinger, Facilities Engineering Division, National Aeronautics & Space Administration... Agency: NASA Property Number: 71201030001 Status: Excess Reasons: Secured Area Bldg. 536 Naval Air... Federal Building 145 Water Street Alpena, MI 49707 Landholding Agency: GSA Property Number: 54201030017...

  9. Background Report: Recommendations on Guidance for Diagnostic X-Ray Studies in Federal Health Care Facilities

    EPA Pesticide Factsheets

    This document shares the guidance developed by the Interagency Working Group which was formed to develop guidance to reduce unnecessary radiation exposures from the use of x-rays in the healing arts in Federal health care facilities.

  10. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  11. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    SciTech Connect

    None,

    1980-05-01

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  12. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  13. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  14. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  15. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  16. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  17. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking...

  18. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... fire prevention standards must Federal facilities comply? 102-74.355 Section 102-74.355 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.355 With what accident and fire prevention standards must Federal facilities comply? To the...

  19. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... fire prevention standards must Federal facilities comply? 102-74.355 Section 102-74.355 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.355 With what accident and fire prevention standards must Federal facilities comply? To the...

  20. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false The location and operation of vending facilities for... § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a... facilities on any Federal property. (b) Any limitation on the location or operation of a vending facility for...

  1. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project...

  2. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies...

  3. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  4. 78 FR 43221 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... real property that HUD has reviewed for suitability for use to assist the homeless. The properties were...

  5. 77 FR 801 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... other real property that HUD has reviewed for suitability for use to assist the homeless. The properties...

  6. 78 FR 9408 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... real property that HUD has reviewed for suitability for use to assist the homeless. The properties were...

  7. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity...

  8. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity...

  9. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... such facility uses any primary energy source other than geothermal resources. (c) General rule. Any... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity made...

  10. 77 FR 20838 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... the Steward B. McKinney Homeless Assistance Act, as amended, HUD publishes a weekly Federal Register... suitability for use to assist the homeless. HUD generally publishes this weekly report each Friday....

  11. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Limitation on committing Federal facilities and resources for emergency preparedness. 352.25 Section 352.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY...

  12. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false FEMA determination on the commitment of Federal facilities and resources. 352.6 Section 352.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER...

  13. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false FEMA determination on the commitment of Federal facilities and resources. 352.6 Section 352.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER...

  14. 6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  15. 4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  16. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  17. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  18. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  19. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  20. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  1. 76 FR 24213 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... 42 CFR Part 412 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2012; Changes in Size and Square Footage of Inpatient Rehabilitation Units and... Services 42 CFR Part 412 RIN 0938-AQ28 Medicare Program; Inpatient Rehabilitation Facility...

  2. 78 FR 25184 - Federal Housing Administration (FHA): Section 232 Healthcare Facility Insurance Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... nursing homes, intermediate care facilities, board and care homes, and assisted-living facilities. The..., Nursing homes, Reporting and recordkeeping requirements. Accordingly, part 232 of title 24 of the Code of Federal Regulations is amended as follows: PART 232--MORTGAGE INSURANCE FOR NURSING HOMES,...

  3. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  4. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  5. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  6. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  7. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  8. Vending Facility Program for the Blind on Federal Property

    DTIC Science & Technology

    1978-04-07

    fully automatic, self- service, or have limited waiter or waitress service. Table or booth seating facilities are always provided. DoD Component food...and other property. 0. SUBSTANTIAL ALTERATION OR RENOVATION A permanent material change in the floor area of a building which would render it...Resources Little Rock, Arkansas 72203 122 C Street, N.W. - 8th Floor (501) 371-2571 Washington, D. C. 20001 (202) 629-5896 California Florida Director

  9. Federal Energy Regulatory Commission dam-safety program

    SciTech Connect

    Foster, J.

    1987-01-01

    The Federal Energy Regulatory Commission (FERC), Office of Hydropower Licensing, is responsible for the regulation of nonfederal hydroelectric power projects. All hydroelectric facilities not owned and operated by a federal agency, such as the Corps of Engineers, TVA or USBR, must obtain an operating license from FERC. The Federal Power Act, first enacted in 1920, gives FERC broad powers to insure public safety and proper utilization of water resources for hyroelectric power generation. FERC currently has jurisdiction over approximately 2200 hydroelectric projects involving approximately 790 dams over 35 feet in height and, therefore, has a keen interest in the safety of existing dams. The dam-safety program at FERC is administered in two ways. First, all projects for which an application for license is received, or for which a major change in development is proposed, must be certified as safe and adequate by Design Review Branch (DRB) Engineers.

  10. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Are Federal...

  11. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are Federal...

  12. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Are Federal...

  13. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How can tribes use Federal highway funds for toll and... Toll, Ferry and Airport Facilities § 170.130 How can tribes use Federal highway funds for toll and ferry facilities? (a) A tribe can use Federal-aid highway funds, including IRR Program funds, to study...

  14. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How can tribes use Federal highway funds for toll and... Toll, Ferry and Airport Facilities § 170.130 How can tribes use Federal highway funds for toll and ferry facilities? (a) A tribe can use Federal-aid highway funds, including IRR Program funds, to study...

  15. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How can tribes use Federal highway funds for toll and... Toll, Ferry and Airport Facilities § 170.130 How can tribes use Federal highway funds for toll and ferry facilities? (a) A tribe can use Federal-aid highway funds, including IRR Program funds, to study...

  16. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exist, Federal agencies must maintain illumination levels at— (a) 50 foot-candles at work station...) 30 foot-candles in work areas during working hours, measured at 30 inches above floor level; (c) 10 foot-candles, but not less than 1 foot-candle, in non-work areas, during working hours (normally this...

  17. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... exist, Federal agencies must maintain illumination levels at— (a) 50 foot-candles at work station...) 30 foot-candles in work areas during working hours, measured at 30 inches above floor level; (c) 10 foot-candles, but not less than 1 foot-candle, in non-work areas, during working hours (normally this...

  18. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exist, Federal agencies must maintain illumination levels at— (a) 50 foot-candles at work station...) 30 foot-candles in work areas during working hours, measured at 30 inches above floor level; (c) 10 foot-candles, but not less than 1 foot-candle, in non-work areas, during working hours (normally this...

  19. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... exist, Federal agencies must maintain illumination levels at— (a) 50 foot-candles at work station...) 30 foot-candles in work areas during working hours, measured at 30 inches above floor level; (c) 10 foot-candles, but not less than 1 foot-candle, in non-work areas, during working hours (normally this...

  20. 41 CFR 102-74.180 - What illumination levels must Federal agencies maintain on Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... exist, Federal agencies must maintain illumination levels at— (a) 50 foot-candles at work station...) 30 foot-candles in work areas during working hours, measured at 30 inches above floor level; (c) 10 foot-candles, but not less than 1 foot-candle, in non-work areas, during working hours (normally this...

  1. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What measures...

  2. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What measures...

  3. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ferry facilities? 170.130 Section 170.130 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR... Toll, Ferry and Airport Facilities § 170.130 How can tribes use Federal highway funds for toll and ferry facilities? (a) A tribe can use Federal-aid highway funds, including IRR Program funds, to study...

  4. Executive summary: legal obstacles and incentives to the development of small scale hydroelectric potential in the seven mid-western states

    SciTech Connect

    None,

    1980-05-01

    The relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities is described. Important features of the constitutional law, statutory law, case law, and regulations of each of the 7 mid-western states (Illinois, Indiana, Kentucky, Michigan, Ohio, West Virginia, and Wisconsin) are highlighted. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development and regulation of water resources. A state-by-state synopsis of these important provisions of the laws of the states that have a bearing on small-scale hydroelectric development is presented.

  5. 75 FR 66077 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of... license for the Mahoning Creek Hydroelectric Project, to be located on Mahoning Creek in Armstrong County...

  6. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final... application for an original license for the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric...

  7. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft... Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project...

  8. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Availability of Final... the application for an original license for the 3.7-megawatt (MW) Gathright Hydroelectric Project...

  9. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Availability of...) Flannagan Hydroelectric Project located on the Pound River, at the U.S. Army Corps of Engineers' (Corps...

  10. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of... Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the...

  11. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing... BOST2 Hydroelectric, LLC for Project No. 13826-000. \\1\\ Under the Commission's Rules of Practice and...

  12. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Bureau of Reclamation Contract for Hydroelectric Power Development at the C-Drop, a Feature of the... accept proposals, select one lessee, and contract for hydroelectric power development at the Klamath... consider proposals for non-Federal development of hydroelectric power at C-Drop of the Klamath Project...

  13. 75 FR 49916 - BOST3 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... Federal Energy Regulatory Commission BOST3 Hydroelectric Company, LLC; Notice of Application Tendered for... following hydroelectric application has been filed with the Commission and is available for public... 26, 2010. d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3). e. Name of Project: Red River Lock...

  14. EPA Recognizes Efforts of More Than 400 Federal Facilities for Green Leadership: Reducing Pollution, Conserving Energy and Saving Money

    EPA Pesticide Factsheets

    WASHINGTON - Today the U.S. Environmental Protection Agency (EPA) recognizes the efforts of more than 400 federal facilities that took steps to reduce pollution, support renewable energy, and operate more efficiently in 2014 as part of the Federal G

  15. 25 CFR 170.130 - How can tribes use Federal highway funds for toll and ferry facilities?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ferry facilities? (a) A tribe can use Federal-aid highway funds, including IRR Program funds, to study... toll facility, these funds will cover a maximum of 80 percent of the project cost. In this case,...

  16. Yacyreta hydroelectric project contract signed

    SciTech Connect

    Not Available

    1987-09-01

    On June 26, 1987 the $270 million contract for the supply of 20 large hydraulic turbines for the Yacyreta Hydroelectric Project was signed by the Entidad Binacional Yacyreta, (a binational agency created by the governments of Argentina and Paraguay for the development of Yacyreta), and by Voith Hydro, Inc., of York, Pennsylvania, and Canadian General Electric of Montreal, Canada. Under the terms of the contract, 9 turbine units will be supplied by Voith Hydro, Inc. from its York, Pennsylvania plant, 4 units by Canadian General Electric of Montreal, and 7 units by Metanac, a consortium of Argentine manufacturers, who will utilize technology and technical assistance from Voith and CGE. The Yacyreta Project is being built on the Parana River on the border between Argentina and Paraguay. Construction at the site commenced in late 1983. Voith's portion of this contrast represents approximately $130 million dollars worth of business for its York, Pennsylvania facility.

  17. 78 FR 70066 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  18. 75 FR 80836 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202...

  19. 75 FR 2558 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ] ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  20. 76 FR 47606 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  1. 75 FR 57052 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  2. 75 FR 41510 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room 7262...

  3. 76 FR 60855 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  4. 77 FR 67389 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  5. 76 FR 70155 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  6. 75 FR 34753 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room 7262...

  7. 75 FR 66774 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  8. 75 FR 36435 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room 7262...

  9. 78 FR 755 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  10. 76 FR 22719 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202...

  11. 75 FR 63501 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  12. 75 FR 49512 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  13. 75 FR 82409 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202...

  14. 75 FR 79013 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202...

  15. 78 FR 64000 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  16. 78 FR 50078 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  17. 76 FR 75554 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice... Housing and Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202...

  18. 76 FR 68170 - Instructions for Implementing Sustainable Locations for Federal Facilities in Accordance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Doc No: 2011-28474] COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Sustainable Locations for Federal Facilities in Accordance With Executive Order 13514 AGENCY: Council on Environmental... instructions. SUMMARY: The Chair of the Council on Environmental Quality (CEQ) has issued instructions...

  19. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE...

  20. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE...

  1. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE...

  2. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE...

  3. 40 CFR 255.33 - Inclusion of Federal facilities and Native American Reservations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Inclusion of Federal facilities and Native American Reservations. 255.33 Section 255.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE...

  4. Wireless Occupancy Sensors for Lighting Controls: An Applications Guide for Federal Facility Managers

    SciTech Connect

    2016-03-15

    This guide provides federal facility managers with an overview of the energy savings potential of wireless lighting occupancy sensors for various room types, cost considerations, key steps to successful installation of wireless sensors, pros and cons of various technology options, light source considerations, and codes and standards.

  5. 75 FR 11904 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... in National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.), HUD... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: March 12, 2010. FOR...

  6. 75 FR 8985 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... order in National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.), HUD... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: February 26, 2010. FOR...

  7. 76 FR 29258 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  8. 76 FR 72717 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  9. 77 FR 19304 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  10. 76 FR 37140 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  11. 75 FR 18231 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.), HUD publishes a... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: April 9, 2010. FOR FURTHER...

  12. 76 FR 71593 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  13. 76 FR 28058 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  14. 78 FR 65698 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  15. 76 FR 1189 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  16. 78 FR 52559 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing...: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless Assistance...

  17. 76 FR 34093 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. ] FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department... INFORMATION: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless...

  18. 77 FR 64347 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  19. 78 FR 57874 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing...: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless Assistance...

  20. 75 FR 47616 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: August 6, 2010. FOR FURTHER... in National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.),...

  1. 76 FR 44033 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  2. 75 FR 6047 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: February 5, 2010. FOR FURTHER... in National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.),...

  3. 76 FR 9588 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  4. 77 FR 37700 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  5. 76 FR 3921 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless...

  6. 78 FR 54905 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  7. 76 FR 16802 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  8. 76 FR 66948 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  9. 76 FR 51997 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  10. 78 FR 41945 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing...: In accordance with 24 CFR Part 581 and section 501 of the Stewart B. McKinney Homeless Assistance...

  11. 75 FR 76999 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  12. 77 FR 4337 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  13. 78 FR 68858 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  14. 78 FR 73554 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing...: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless Assistance...

  15. 75 FR 4836 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. DATES: Effective Date: January 29, 2010. FOR FURTHER... in National Coalition for the Homeless v. Veterans Administration, No. 88-2503-OG (D.D.C.),...

  16. 77 FR 11149 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  17. 76 FR 18231 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... URBAN DEVELOPMENT Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the... for possible use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of... INFORMATION: In accordance with 24 CFR part 581 and section 501 of the Stewart B. McKinney Homeless...

  18. 42 CFR 51c.507 - Facility which has previously received Federal grant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Facility which has previously received Federal grant. 51c.507 Section 51c.507 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES Acquisition and Modernization of Existing Buildings...

  19. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of ridesharing (carpools, vanpools, privately leased buses, public transportation, and other multi... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What Federal facility ridesharing policy must Executive agencies follow? 102-74.205 Section 102-74.205 Public Contracts and Property...

  20. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of ridesharing (carpools, vanpools, privately leased buses, public transportation, and other multi... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What Federal facility ridesharing policy must Executive agencies follow? 102-74.205 Section 102-74.205 Public Contracts and Property...

  1. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of ridesharing (carpools, vanpools, privately leased buses, public transportation, and other multi... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What Federal facility ridesharing policy must Executive agencies follow? 102-74.205 Section 102-74.205 Public Contracts and Property...

  2. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ...-Federal development of environmentally sustainable hydropower potential on Federal water resource projects... sustainable, low impact, or small hydropower development that avoids, reduces, or minimizes environmental... Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project,...

  3. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    SciTech Connect

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  4. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  5. Outmigration of landlocked Atlantic salmon (Salmo salar) smolts and effectiveness of an angled trash rack/fish bypass structure at a small scale hydroelectric facility. [Salmo salar

    SciTech Connect

    Nettles, D.C.; Gloss, S.P.

    1985-01-01

    Modes of downstream passage (penstock, spillway, diversion chute) by Atlantic salmon (Salmo salar) smolts were monitored using radio telemetry to assess the effectiveness of an angled trash rack/fish bypass structure at a small hydroelectric dam on the Boquet River, New York. Telemetry of 170 Atlantic salmon smolts and visual observations of stocked smolts were used to determine aspects of Atlantic salmon outmigration behavior. Smolts initiated mass migrations after river temperatures reached or exceeded 10/sup 0/C. Many radio-tagged smolts interrupted movements upon reaching ponded waters and/or the dam. River flow did not (P > .05) affect the frequency of migratory movements, passages, or rate of movement. Migrations were of approximately 30 days duration. Passages at the dam occurred primarily at night (61%) with diurnal passages (17%) and crepuscular passages (17%) of secondary importance. Timing of 5% of the passages was undetermined. All passages which occurred when angled trash racks were in place were through the bypass or over the spillway. Six (6) passages occurred when trash racks perpendicular to the penstock were in place: 3 of these were penstock passages. The angled trash rack and bypass structure served to reduce entrainment.

  6. H.R. 657: A Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This legislation proposes extending the deadlines for commencement of construction of three FERC hydroelectric projects in the state of Arkansas for a maximum of three consecutive two year terms. The projects are identified as FERC projects 4204, 4660, and 4659.

  7. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  8. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  9. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Ridesharing § 102-74.210 What... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What steps...

  10. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Ridesharing § 102-74.210 What... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What steps...

  11. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Ridesharing § 102-74.210 What... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What steps...

  12. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  13. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  14. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  15. 43 CFR 3276.10 - What are the reporting requirements for facility and lease operations involving Federal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facility and lease operations involving Federal geothermal resources? 3276.10 Section 3276.10 Public Lands... INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Reports: Utilization Operations § 3276.10 What are the reporting requirements for facility and lease operations involving Federal...

  16. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    SciTech Connect

    Walsh, T.J.

    1994-01-31

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup.

  17. 77 FR 32621 - Developing Large-Scale Renewable Energy Projects at Federal Facilities Using Private Capital Draft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... of Energy Efficiency and Renewable Energy Developing Large-Scale Renewable Energy Projects at Federal... draft guidebook entitled Federal Renewable Energy Guide: Developing Large-Scale Renewable Energy... Energy Guide: Developing Large-Scale Renewable Energy Projects at Federal Facilities Using...

  18. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products...

  19. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products...

  20. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products...

  1. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products...

  2. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products...

  3. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.355 With what accident and fire prevention standards must Federal facilities comply? To the... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false With what accident and...

  4. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.355 With what accident and fire prevention standards must Federal facilities comply? To the... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false With what accident and...

  5. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.355 With what accident and fire prevention standards must Federal facilities comply? To the... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false With what accident and...

  6. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    SciTech Connect

    1994-08-31

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.

  7. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  8. Cleanups In My Community (CIMC) - Federal Facility RCRA Sites, National Layer

    EPA Pesticide Factsheets

    Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Resource Conservation and Recovery Act (RCRA) sites as part of the CIMC web service. The Resource Conservation and Recovery Act, among other things, helps ensure that wastes are managed in an environmentally sound manner so as to protect human health and the environment from the potential hazards of waste disposal.In particular, RCRA tightly regulates all hazardous waste from cradle to grave. In general, all generators, transporters, treaters, storers, and disposers of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies, in turn pass on the information to regional and national EPA offices. Accidents or other activities at facilities that treat, store or dispose of hazardous wastes have sometimes led to the release of hazardous waste or hazardous constituents into soil, ground water, surface water, or air. When that happens, the RCRA Corrective Action program is one program that may be used to accomplish the necessary cleanup.In Cleanups in My Community, you can map or list RCRA Corrective Action sites that are currently undergoing corrective action, sites for which a remedy has been selected, sites for which construction has been completed, and sites where the corrective action cleanup is complete. This data layer shows those RCRA sites that are located at Federa

  9. Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309

    SciTech Connect

    Anderson, K.

    2012-04-01

    This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

  10. Adapting federated cyberinfrastructure for shared data collection facilities in structural biology

    PubMed Central

    Stokes-Rees, Ian; Levesque, Ian; Murphy, Frank V.; Yang, Wei; Deacon, Ashley; Sliz, Piotr

    2012-01-01

    Early stage experimental data in structural biology is generally unmaintained and inaccessible to the public. It is increasingly believed that this data, which forms the basis for each macromolecular structure discovered by this field, must be archived and, in due course, published. Furthermore, the widespread use of shared scientific facilities such as synchrotron beamlines complicates the issue of data storage, access and movement, as does the increase of remote users. This work describes a prototype system that adapts existing federated cyberinfra­structure technology and techniques to significantly improve the operational environment for users and administrators of synchrotron data collection facilities used in structural biology. This is achieved through software from the Virtual Data Toolkit and Globus, bringing together federated users and facilities from the Stanford Synchrotron Radiation Lightsource, the Advanced Photon Source, the Open Science Grid, the SBGrid Consortium and Harvard Medical School. The performance and experience with the prototype provide a model for data management at shared scientific facilities. PMID:22514186

  11. Hazardous Waste Minimization through Life Cycle Cost Analysis at Federal Facilities.

    PubMed

    Ray, Chittaranjan; Jain, Ravi K; Donahue, Bernard A; Smith, E Dean

    1999-01-01

    In response to the Hazardous and Solid Waste Amendments, many federal facilities are carefully examining hazardous waste minimization issues. A hazardous waste minimization assessment was conducted recently at five military installations. Sources and types of waste somewhat varied among the installations. Major waste sources included motor pools and vehicle maintenance facilities; industrial maintenance and small arms shops; aviation maintenance facilities; paint shops; photography, arts and crafts shops; and hospitals, clinics, and laboratories. Typical waste streams included used engine oil, cleaning and degreasing solvents, paint thinners, antifreeze and coolants, batteries, inks, and pathological wastes. Source reduction, recycling, and treatment were considered as the three major modes of waste minimization. Through life-cycle cost analysis, feasible modes of waste minimization are presented.

  12. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2014. Final rule.

    PubMed

    2013-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's "60 percent rule'' compliance calculation to determine "presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  13. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All... Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a. Date and Time of Meeting: Wednesday, August...

  14. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12642-005] Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On April 15, 2013, Wilkesboro Hydroelectric Company, LLC...

  15. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Doc No: E9-31210] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12569-001] Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting... Hydroelectric Project. f. Location: On the Similkameen River, in the Town of Oroville, Okanogan...

  16. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Energy Regulatory Commission Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application... Creek Hydroelectric Project to be located on Castle Creek, near the town of Aspen, Pitkin County, Colorado. The project would affect federal lands administered by the Forest Service. The sole purpose of...

  17. 77 FR 790 - Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... Energy Regulatory Commission Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application... Hydroelectric Project to be located on Grant Lake and Grant Creek, near the town of Moose Pass, Kenai Peninsula, Alaska. The project affects federal lands administered by the ] U.S. Forest Service within the...

  18. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric... of Historic Places at the Martin Dam Hydroelectric Project. The Programmatic Agreement, when...

  19. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing... priority is as follows: 1. BOST2 Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC...

  20. The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.

    1999-01-01

    Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the

  1. The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

    NASA Technical Reports Server (NTRS)

    Underwood, Bruce E.

    1999-01-01

    Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the

  2. 41 CFR 102-81.20 - Are the security standards for new Federally owned and leased facilities the same as the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standards for new Federally owned and leased facilities the same as the standards for existing Federally owned and leased facilities? 102-81.20 Section 102-81.20 Public Contracts and Property Management...-SECURITY Security § 102-81.20 Are the security standards for new Federally owned and leased facilities the...

  3. Requirements and impacts of the Federal Facility Compliance Act on the Department of Energy

    SciTech Connect

    Chang, L.; Tripp, S.C.

    1993-03-01

    The Federal Facilities Compliance Act (FFCA, the Act) was signed into law on October 6, 1992, primarily as a means of waiving sovereign immunity for federal facilities with respect to requirements under the Resource Conservation and Recovery Act. DOE`s implementation of the FFCA will have significant effects on current and future DOE waste management operations. DOE will need to rethink its strategy in the area of future compliance agreements to ensure commitments and deliverables are made consistent throughout the different DOE facilities. Several types of agreements that address mixed waste land disposal restriction (LDR) compliance have already been signed by both DOE and the regulators. These agreements are in place at the Hanford Reservation, the Savannah River Site, the Oak Ridge Reservation (Oak Ridge National Laboratory, K-25, Y-12), and the Paducah Gaseous Diffusion Plant. The Rocky Flats Agreement is now being renegotiated. Los Alamos National Laboratory, Sandia/Albuquerque National Laboratory, Lawrence Livermore National Laboratory, and Idaho National Engineering Laboratory agreements are in progress. Major components of the FFCA include provisions on: sovereign immunity waiver; cost reimbursements; mixed waste requirements, including inventory reports on mixed waste and treatment capacity and technologies; and plans for the development of treatment capacities and technologies. Each of these components is discussed within this paper.

  4. Analysis of EPA's Federal Facilities Restoration and Reuse Office (FFRRO) Regional Program Performance: Fiscal Years 2005-2011

    EPA Pesticide Factsheets

    This is a summary report of a series of analyses of the Federal Facilities Restoration and Reuse Office (FFRRO) regional programs' performance in meeting their annual targets for the last seven years (2005-2011).

  5. Analysis of EPA’s Federal Facilities Restoration and Reuse Office (FFRRO) Regional Program Performance: Fiscal Years 2005-2013

    EPA Pesticide Factsheets

    This is a summary report of a series of analyses of the Federal Facilities Restoration and Reuse Office (FFRRO) regional programs' performance in meeting their annual targets for the last seven years (2005-2013).

  6. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  7. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2010. Final rule.

    PubMed

    2009-08-07

    This final rule updates the payment rates for inpatient rehabilitation facilities (IRFs) for Federal fiscal year (FY) 2010 (for discharges occurring on or after October 1, 2009 and on or before September 30, 2010) as required under section 1886(j)(3)(C) of the Social Security Act (the Act). Section 1886(j)(5) of the Act requires the Secretary to publish in the Federal Register on or before the August 1 that precedes the start of each fiscal year, the classification and weighting factors for the IRF prospective payment system's (PPS) case-mix groups and a description of the methodology and data used in computing the prospective payment rates for that fiscal year. We are revising existing policies regarding the IRF PPS within the authority granted under section 1886(j) of the Act.

  8. Underground pumped hydroelectric storage

    NASA Astrophysics Data System (ADS)

    Allen, R. D.; Doherty, T. J.; Kannberg, L. D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-velocity requirements of a greater metropolitan area with population of 1 million or more.

  9. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2017. Final rule.

    PubMed

    2016-08-05

    This final rule will update the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2017 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS's) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2017. This final rule also revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP).

  10. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The Resource Conservation and Recovery Act, among other things, helps ensure that wastes are managed in an environmentally sound manner so as to protect human health and the environment from the potential hazards of waste disposal.In particular RCRA tightly regulates all hazardous waste from cradle to grave. In general, all generators, transporters, treaters, storers, and disposers of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies, in turn pass on the information to regional and national EPA offices. Accidents or other activities at facilities that treat, store or dispose of hazardous wastes have sometimes led to the release of hazardous waste or hazardous constituents into soil, ground water, surface water, or air. When that happens, the RCRA Corrective Action program is one program that may be used to accomplish the necessary cleanup.This data layer shows those RCRA sites that are located at BRAC Federal Facilities. Additional RCRA sites and other BRAC sites (those that are not RCRA sites) are included in other data layers as part of this web service.Note: RCRA facilities which are not undergoing corrective action are not considered ??Cleanups?? in Cleanups in My Community. The complete set of RCRA facilities can be accessed via

  11. Analysis of federal and state policies and environmental issues for bioethanol production facilities.

    PubMed

    McGee, Chandra; Chan Hilton, Amy B

    2011-03-01

    The purpose of this work was to investigate incentives and barriers to fuel ethanol production from biomass in the U.S. during the past decade (2000-2010). In particular, we examine the results of policies and economic conditions during this period by way of cellulosic ethanol activity in four selected states with the potential to produce different types of feedstocks (i.e., sugar, starch, and cellulosic crops) for ethanol production (Florida, California, Hawaii, and Iowa). Two of the four states, Iowa and California, currently have commercial ethanol production facilities in operation using corn feedstocks. While several companies have proposed commercial scale facilities in Florida and Hawaii, none are operating to date. Federal and state policies and incentives, potential for feedstock production and conversion to ethanol and associated potential environmental impacts, and environmental regulatory conditions among the states were investigated. Additionally, an analysis of proposed and operational ethanol production facilities provided evidence that a combination of these policies and incentives along with the ability to address environmental issues and regulatory environment and positive economic conditions all impact ethanol production. The 2000-2010 decade saw the rise of the promise of cellulosic ethanol. Federal and state policies were enacted to increase ethanol production. Since the initial push for development, expansion of cellulosic ethanol production has not happened as quickly as predicted. Government and private funding supported the development of ethanol production facilities, which peaked and then declined by the end of the decade. Although there are technical issues that remain to be solved to more efficiently convert cellulosic material to ethanol while reducing environmental impacts, the largest barriers to increasing ethanol production appear to be related to government policies, economics, and logistical issues. The numerous federal and state

  12. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  13. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  14. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  15. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  16. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What energy conservation... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of...

  17. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false The location and operation of vending facilities for... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF... § 395.30 The location and operation of vending facilities for blind vendors on Federal property....

  18. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true The location and operation of vending facilities for... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF... § 395.30 The location and operation of vending facilities for blind vendors on Federal property....

  19. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What heating and cooling... and Property Management Federal Property Management Regulations System (Continued) FEDERAL...

  20. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What heating and cooling... and Property Management Federal Property Management Regulations System (Continued) FEDERAL...

  1. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What heating and cooling... and Property Management Federal Property Management Regulations System (Continued) FEDERAL...

  2. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What heating and cooling... and Property Management Federal Property Management Regulations System (Continued) FEDERAL...

  3. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What heating and cooling... and Property Management Federal Property Management Regulations System (Continued) FEDERAL...

  4. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are Federal...

  5. 41 CFR 102-80.45 - What are Federal agencies' responsibilities concerning seismic safety in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Seismic Safety § 102-80.45 What are Federal agencies' responsibilities concerning... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What are Federal...

  6. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    SciTech Connect

    Moss, R. H.; Delgado, A.; Malone, E L.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  7. Producing a programmatic environmental impact statement for a large federal facility: a GIS technical leader`s perspective

    SciTech Connect

    Kuiper, J.

    1996-05-01

    Producing a programmatic Environmental Impact Statement (EIS) for a large federal facility requires consideration of a wide range of activities, collection of an extensive amount of data, and analysis and modeling to determine the nature and extent of potential environmental impacts. EIS documents provide the most detailed analyses of federal facilities required by the National Environmental Policy Act of 1969. An extensive, environmentally focused Geographic Information System (GIS) was developed and used in the analyses, modeling, and mapping for an EIS of a federal facility with an area of more than 100 square miles. The final products of the EIS process will include a printed document with more than 250-GIS-produced maps, CD-ROM versions of both the document and the GIS metadata dictionary, and an environmentally focused GIS that will form a baseline of information for the facility. The environmental GIS will augment the installation`s existing infrastructure-related GIS>

  8. Assessing O&M Practices at Federal Facilities - What do the ESET Data Tell Us

    SciTech Connect

    Hunt, W. D.

    2006-09-13

    In late 2005, the Department of Energy (DOE) Federal Energy Management Program (FEMP) Energy Saving Expert Teams (ESET) conducted assessments at 28 Federal sites. These assessments were directed by President Bush in a memorandum to Federal agencies in response to projected natural gas shortages resulting from Hurricanes Katrina and Rita. The primary focus of the ESET assessments was to identify low-cost and no-cost (operations and maintenance-oriented) energy efficiency measures that the sites could quickly and easily adopt to relieve the expected supply shortfall, while also realizing significant energy and cost savings. The assessments successfully identified large potential natural gas savings opportunities available at low-cost/no-cost through energy efficiency measures such as boiler tune-ups, repair of steam and condensate leaks, repair of missing and/or damaged insulation, adjusting temperature and setback setpoints, and modifying equipment operating schedules. Because these savings opportunities were largely anticipated, the issue now becomes one of helping facility managers more easily identify and address these opportunities as they arise.

  9. Assessing O&M Practices at Federal Facilities - What do the ESET Data Tell Us

    SciTech Connect

    Hunt, W. D.

    2008-02-22

    In late 2005, the Department of Energy (DOE) Federal Energy Management Program (FEMP) Energy Saving Expert Teams (ESET) conducted assessments at 28 Federal sites. These assessments were directed by President Bush in a memorandum to Federal agencies in response to projected natural gas shortages resulting from Hurricanes Katrina and Rita. The primary focus of the ESET assessments was to identify low-cost and no-cost (operations and maintenance-oriented) energy efficiency measures that the sites could quickly and easily adopt to relieve the expected supply shortfall, while also realizing significant energy and cost savings. The assessments successfully identified large potential natural gas savings opportunities available at low-cost/no-cost through energy efficiency measures such as boiler tune-ups, repair of steam and condensate leaks, repair of missing and/or damaged insulation, adjusting temperature and setback setpoints, and modifying equipment operating schedules. Because these savings opportunities were largely anticipated, the issue now becomes one of helping facility managers more easily identify and address these opportunities as they arise.

  10. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  11. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making

  12. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2018. Final rule.

    PubMed

    2017-08-03

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).

  13. Underground pumped hydroelectric storage

    SciTech Connect

    Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

  14. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  15. Post-occupancy energy efficiency evaluation of a LEED Platinum Federal Government facility

    NASA Astrophysics Data System (ADS)

    Tincher, Theresa

    The purpose of this study was to gain a comprehensive understanding of the Leadership in Energy and Environmental Design (LEEDRTM) certification system and its relevance to Federal policies, building codes, and building standards, develop experience with whole building energy modeling, and determine the actual post-occupancy energy usage as compared with developed model and design projections. This thesis hypothesized the U.S. Green Building Council's LEED rating system compared favorably to other policies, codes, and standards in use at the time, and the U.S. Bureau of Reclamations' LEED Platinum Lower Colorado Regional Office Green Building (LCROGB), located in Boulder City, Nevada, operated at least as energy efficiently as designed. Both hypotheses were shown to be true. Based on the design and development requirements for the 49,818 square foot LCROGB being studied, the primary building requirements addressed were the U.S. Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings, ASHRAE Standard 90.1-2007, and the LEED V2009 certification system for new construction. LEED V2009 certification requirements compared favorably by either meeting or exceeding other stated requirements. The whole building energy simulation, QUick Energy Simulation Tool (eQUEST) Version 3.65, was used for the study, and baseline and proposed models were developed. The eQUEST results compared favorably with the designer's simulations developed using the Hourly Analysis Program (HAP) Version 4.5. eQUEST predicted a 32.7% savings in overall energy usage, compared to the HAP 38.9% prediction. In 2013, the LCROGB used 600,042 kWh of energy, and 60% was electrical and 40% was natural gas. This usage demonstrated high building efficiency with an Energy Use Intensity (EUI) of 41.1 kBtu/sf/yr. Following more than two years of post-occupancy operation, the LCROGB was electrically more efficient than predicted by either HAP or eQUEST, although the facility was

  16. Legal obstacles and incentives to the third development of small-scale hydroelectric potential in the six New England states: executive summary

    SciTech Connect

    None,

    1980-05-01

    This executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities. It also highlights important features of the constitutional law, statutory law, case law, and regulations of each of the six New England states. The summary may serve as a concise overview of and introduction to the detailed reports prepared by the Energy Law Institute on the legal and regulatory systems of each of the six states. The dual regulatory system is a function of the federalist nature of our government. This dual system is examined from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development. The regulation of small dams are discussed and flow diagrams of the regulations are presented for each of the six states - Maine, Massachusetts, Vermont, New Hampshire, Vermont, and Connecticut.

  17. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  18. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2016. Final rule.

    PubMed

    2015-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2016 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF PPS's case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2016. This final rule also finalizes policy changes, including the adoption of an IRF-specific market basket that reflects the cost structures of only IRF providers, a 1-year phase-in of the revised wage index changes, a 3-year phase-out of the rural adjustment for certain IRFs, and revisions and updates to the quality reporting program (QRP).

  19. Guidance for federal facilities on release notification requirements under CERCLA and SARA Title 3

    SciTech Connect

    Not Available

    1990-11-01

    The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA or Superfund''), as amended, creates a framework for Federal involvement in response to and cleanup of hazardous substance releases. Although many of its provisions deal with cleanup, liability, and compensation associated with inactive or abandoned hazardous waste sites, equally important parts of CERCLA address the reporting of and response to releases of hazardous substances as they occur. The statute establishes a list of hazardous substances,'' of which there are currently 727. The CERCLA list contains hazardous substances identified under other statutes, including the Clean Water Act (CWS), the Clean Air Act (CAA), and the Resource Conservation and Recovery Act (RCRA). CERCLA also contains a provision authorizing the Administrator of the US Environmental Protection Agency (EPA) to add substances to the list that when released into the environment may present substantial danger to the public health or welfare or the environment...'' EPA is providing this guidance document so that Federal facilities may better understand the CERCLA and SARA Title 3 release notification requirements. The information is presented in a variety of formats, including questions and answers, fact sheets, scenarios, and a flowchart. A glossary of key terms also has been included in this document. 5 figs.

  20. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2015.

    PubMed

    2014-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2015 as required by the statute. This final rule finalizes a policy to collect data on the amount and mode (that is, Individual, Concurrent, Group, and Co-Treatment) of therapy provided in the IRF setting according to therapy discipline, revises the list of diagnosis and impairment group codes that presumptively meet the "60 percent rule'' compliance criteria, provides a way for IRFs to indicate on the Inpatient Rehabilitation Facility-Patient Assessment Instrument (IRF-PAI) form whether the prior treatment and severity requirements have been met for arthritis cases to presumptively meet the "60 percent rule'' compliance criteria, and revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). This rule also delays the effective date for the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that were finalized in FY 2014 IRF PPS final rule and adopts the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that are finalized in this rule. This final rule also addresses the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), for the IRF prospective payment system (PPS), which will be effective when ICD-10-CM becomes the required medical data code set for use on Medicare claims and IRF-PAI submissions.

  1. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  2. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  3. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  4. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  5. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Energy Regulatory Commission Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have changed its name to Salmon Creek Hydroelectric Company, LLC for...

  6. Federal Facilities Reports About Underground Storage Tank Compliance - 2005 Energy Policy Act

    EPA Pesticide Factsheets

    Find links to reports from 24 federal agencies regarding the compliance status of underground storage tanks owned or operated by the federal agencies or located on land managed by the federal agencies.

  7. Guide for Determining Compliance With the Clean Air Act Standards for Radionuclide Emissions From NRC-Licensed and Non-DOE Federal Facilities: Revision 2

    EPA Pesticide Factsheets

    The requirements described apply to certain facilities licensed by the Nuclear Regulatory Commission (NRC) or its Agreement States to handle radioactive materials. Federal facilities not part of the Department of Energy (DOE) are also covered.

  8. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical...

  9. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical...

  10. 78 FR 12344 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  11. 75 FR 72835 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... publishes a Notice, on a weekly basis, identifying unutilized, underutilized, excess and surplus Federal...

  12. 76 FR 30955 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  13. 78 FR 37561 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  14. 76 FR 19780 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  15. 76 FR 14980 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  16. 76 FR 35460 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  17. 76 FR 5188 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  18. 76 FR 41807 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  19. 78 FR 2418 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  20. 76 FR 50239 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  1. 77 FR 70179 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  2. 75 FR 27353 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... Notice, on a weekly basis, identifying unutilized, underutilized, excess and surplus Federal buildings...

  3. 75 FR 58422 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... publishes a Notice, on a weekly basis, identifying unutilized, underutilized, excess and surplus Federal...

  4. 75 FR 30051 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... Notice, on a weekly basis, identifying unutilized, underutilized, excess and surplus Federal buildings...

  5. 76 FR 24044 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  6. 77 FR 2991 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... unutilized, underutilized, excess and surplus Federal buildings and real property that HUD has reviewed for...

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  8. Environmental mitigation at hydroelectric projects: Volume II. Benefits and costs of fish passage and protection

    SciTech Connect

    Francfort, J. E.; Cada, G. F.; Dauble, D. D.; Hunt, R. T.; Jones, D. W.; Rinehart, B. N.; Sommers, G. L.; Costello, R. J.

    1994-01-01

    The Department of Energy, through its hydropower program, is studying environmental mitigation practices at hydroelectric projects. The study of environmental mitigation is intended to provide greater understanding of environmental problems and solutions that are associated with conventional hydroelectric projects. This volume examines upstream and downstream fish passage/protection technologies and the associated practices, benefits, and costs. Fish passage/protection mitigation technologies are investigated by three methods: (a) national, regional (Federal Energy Regulatory Commission regions), and temporal frequencies of fish passage/protection mitigation are examined at 1,825 operating and conventional (excludes pumped storage) Federal Energy Regulatory Commission (FERC) regulated hydroelectric sites in the United States; (b) general fish passage/protection mitigation costs are discussed for 50 FERC regulated hydroelectric projects; and (c) 16 case studies are used to examine specific fish passage/protection mitigation practices, benefits, and costs.

  9. Results of operation and current safety performance of nuclear facilities located in the Russian Federation

    NASA Astrophysics Data System (ADS)

    Kuznetsov, V. M.; Khvostova, M. S.

    2016-12-01

    After the NPP radiation accidents in Russia and Japan, a safety statu of Russian nuclear power plants causes concern. A repeated life time extension of power unit reactor plants, designed at the dawn of the nuclear power engineering in the Soviet Union, power augmentation of the plants to 104-109%, operation of power units in a daily power mode in the range of 100-70-100%, the use of untypical for NPP remixed nuclear fuel without a careful study of the results of its application (at least after two operating periods of the research nuclear installations), the aging of operating personnel, and many other management actions of the State Corporation "Rosatom", should attract the attention of the Federal Service for Ecological, Technical and Atomic Supervision (RosTekhNadzor), but this doesn't happen. The paper considers safety issues of nuclear power plants operating in the Russian Federation. The authors collected statistical information on violations in NPP operation over the past 25 years, which shows that even after repeated relaxation over this period of time of safety regulation requirements in nuclear industry and highly expensive NPP modernization, the latter have not become more safe, and the statistics confirms this. At a lower utilization factor high-power pressure-tube reactors RBMK-1000, compared to light water reactors VVER-440 and 1000, have a greater number of violations and that after annual overhauls. A number of direct and root causes of NPP mulfunctions is still high and remains stable for decades. The paper reveals bottlenecks in ensuring nuclear and radiation safety of nuclear facilities. Main outstanding issues on the storage of spent nuclear fuel are defined. Information on emissions and discharges of radioactive substances, as well as fullness of storages of solid and liquid radioactive waste, located at the NPP sites are presented. Russian NPPs stress test results are submitted, as well as data on the coming removal from operation of NPP

  10. 41 CFR 102-37.180 - Does a SASP need special authorization to screen property at Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does a SASP need special authorization to screen property at Federal facilities? 102-37.180 Section 102-37.180 Public Contracts and...) Screening and Requesting Property § 102-37.180 Does a SASP need special authorization to screen property at...

  11. 41 CFR 102-37.180 - Does a SASP need special authorization to screen property at Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does a SASP need special authorization to screen property at Federal facilities? 102-37.180 Section 102-37.180 Public Contracts and...) Screening and Requesting Property § 102-37.180 Does a SASP need special authorization to screen property at...

  12. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  13. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  14. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  15. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  16. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  17. 41 CFR 102-73.250 - Are agencies required to adhere to the policies for locating Federal facilities when purchasing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are agencies required to adhere to the policies for locating Federal facilities when purchasing buildings? 102-73.250 Section 102... Condemnation Buildings § 102-73.250 Are agencies required to adhere to the policies for locating...

  18. 41 CFR 102-73.250 - Are agencies required to adhere to the policies for locating Federal facilities when purchasing...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are agencies required to adhere to the policies for locating Federal facilities when purchasing buildings? 102-73.250 Section 102... Condemnation Buildings § 102-73.250 Are agencies required to adhere to the policies for locating...

  19. Chiller Controls-related Energy Saving Opportunities in FederalFacilities

    SciTech Connect

    Webster, Tom

    2003-01-01

    Chillers are a significant component of large facility energy use. The focus of much of the development of chilled water systems in recent years has been on optimization of set point and staging controls, improvements in chiller design to increase efficiency and accommodate chlorofluorocarbon (CFC) refrigerant replacements. Other improvements have been made by upgrading controls to the latest digital technologies, improving access and monitoring via communications and sophisticated liquid crystal displays (LCD), more robust fault diagnostics and operating and maintenance information logging. Advances have also been made in how chiller plant systems are designed and operated, and in the diversity of chiller products that are available to support innovative approaches. As in many industries, these improvements have been facilitated by advances in, and lower costs for, enabling technologies, such as refrigerants, compressor design, electronics for controls and variable frequency drives (VFD). Along with the improvements in electronics one would expect that advances have also been made in the functionality of unit controls included with chillers. Originally, the primary purpose of this project was to investigate the state of practice of chiller unit controllers in terms of their energy saving capabilities. However, early in the study it was discovered that advances in this area did not include incorporation of significantly different capabilities than had existed 10-15 years ago. Thus the scope has been modified to provide an overview of some of the basic controls-related energy saving strategies that are currently available along with guideline estimates of their potential and applicability. We have minimized consideration of strategies that could be primarily implemented via design practices such as chiller selection and plant design, and those that can only be implemented by a building management system (BMS). Also, since most of the floor space of federal buildings

  20. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…

  1. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…

  2. A Study of United States Hydroelectric Plant Ownership

    SciTech Connect

    Hall, Douglas G.; Reeves, Kelly S.

    2006-06-01

    Ownership of United States hydroelectric plants is reviewed from several perspectives. Plant owners are grouped into six owner classes as defined by the Federal Energy Regulatory Commission. The numbers of plants and the corresponding total capacity associated with each owner class are enumerated. The plant owner population is also evaluated based on the number of owners in each owner class, the number of plants owned by a single owner, and the size of plants based on capacity ranges associated with each owner class. Plant numbers and corresponding total capacity associated with owner classes in each state are evaluated. Ownership by federal agencies in terms of the number of plants owned by each agency and the corresponding total capacity is enumerated. A GIS application that is publicly available on the Internet that displays hydroelectric plants on maps and provides basic information about them is described.

  3. A Study of United States Hydroelectric Plant Ownership

    SciTech Connect

    Douglas G Hall

    2006-06-01

    Ownership of United States hydroelectric plants is reviewed from several perspectives. Plant owners are grouped into six owner classes as defined by the Federal Energy Regulatory Commission. The numbers of plants and the corresponding total capacity associated with each owner class are enumerated. The plant owner population is also evaluated based on the number of owners in each owner class, the number of plants owned by a single owner, and the size of plants based on capacity ranges associated with each owner class. Plant numbers and corresponding total capacity associated with owner classes in each state are evaluated. Ownership by federal agencies in terms of the number of plants owned by each agency and the corresponding total capacity is enumerated. A GIS application that is publicly available on the Internet that displays hydroelectric plants on maps and provides basic information about them is described.

  4. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Conformity evaluation for Federal... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING CONFORMITY OF FEDERAL ACTIONS TO STATE OR FEDERAL IMPLEMENTATION PLANS Determining Conformity of General Federal Actions to State or...

  5. 75 FR 75487 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... inventory of excess or surplus Federal property. This Notice is also published in order to comply with the... Assistant Secretary for Special Needs. Title V, Federal Surplus Property Program Federal Register Report for...

  6. 78 FR 21962 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... excess or surplus Federal property. This Notice is also published in order to comply with the December 12..., FEDERAL SURPLUS PROPERTY PROGRAM FEDERAL REGISTER REPORT FOR 04/12/2013 SUITABLE/AVAILABLE PROPERTIES...

  7. 76 FR 6489 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... inventory of excess or surplus Federal property. This Notice is also published in order to comply with the... Special Needs. Title V, Federal Surplus Property Program Federal Register Report for 02/04/2011 Unsuitable...

  8. 77 FR 58565 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... excess or surplus Federal property. This Notice is also published in order to comply with the December 12... Special Needs (Acting). TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM FEDERAL REGISTER REPORT FOR 09/21/2012...

  9. A Proof-of-Concept for Semantically Interoperable Federation of IoT Experimentation Facilities.

    PubMed

    Lanza, Jorge; Sanchez, Luis; Gomez, David; Elsaleh, Tarek; Steinke, Ronald; Cirillo, Flavio

    2016-06-29

    The Internet-of-Things (IoT) is unanimously identified as one of the main pillars of future smart scenarios. The potential of IoT technologies and deployments has been already demonstrated in a number of different application areas, including transport, energy, safety and healthcare. However, despite the growing number of IoT deployments, the majority of IoT applications tend to be self-contained, thereby forming application silos. A lightweight data centric integration and combination of these silos presents several challenges that still need to be addressed. Indeed, the ability to combine and synthesize data streams and services from diverse IoT platforms and testbeds, holds the promise to increase the potentiality of smart applications in terms of size, scope and targeted business context. In this article, a proof-of-concept implementation that federates two different IoT experimentation facilities by means of semantic-based technologies will be described. The specification and design of the implemented system and information models will be described together with the practical details of the developments carried out and its integration with the existing IoT platforms supporting the aforementioned testbeds. Overall, the system described in this paper demonstrates that it is possible to open new horizons in the development of IoT applications and experiments at a global scale, that transcend the (silo) boundaries of individual deployments, based on the semantic interconnection and interoperability of diverse IoT platforms and testbeds.

  10. A Proof-of-Concept for Semantically Interoperable Federation of IoT Experimentation Facilities

    PubMed Central

    Lanza, Jorge; Sanchez, Luis; Gomez, David; Elsaleh, Tarek; Steinke, Ronald; Cirillo, Flavio

    2016-01-01

    The Internet-of-Things (IoT) is unanimously identified as one of the main pillars of future smart scenarios. The potential of IoT technologies and deployments has been already demonstrated in a number of different application areas, including transport, energy, safety and healthcare. However, despite the growing number of IoT deployments, the majority of IoT applications tend to be self-contained, thereby forming application silos. A lightweight data centric integration and combination of these silos presents several challenges that still need to be addressed. Indeed, the ability to combine and synthesize data streams and services from diverse IoT platforms and testbeds, holds the promise to increase the potentiality of smart applications in terms of size, scope and targeted business context. In this article, a proof-of-concept implementation that federates two different IoT experimentation facilities by means of semantic-based technologies will be described. The specification and design of the implemented system and information models will be described together with the practical details of the developments carried out and its integration with the existing IoT platforms supporting the aforementioned testbeds. Overall, the system described in this paper demonstrates that it is possible to open new horizons in the development of IoT applications and experiments at a global scale, that transcend the (silo) boundaries of individual deployments, based on the semantic interconnection and interoperability of diverse IoT platforms and testbeds. PMID:27367695

  11. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    SciTech Connect

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L.; Cada, G.F.; Jones, D.W.; Dauble, D.D.; Hunt, R.T.; Costello, R.J.

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  12. Conceptual aspects of fiscal interactions between local governments and federally-owned, high-level radioactive waste-isolation facilities

    SciTech Connect

    Bjornstad, D.J.; Johnson, K.E.

    1981-01-01

    This paper examines a number of ways to transfer revenues between a federally-owned high level radioactive waste isolation facility (hereafter simply, facility) and local governments. Such payments could be used to lessen fiscal disincentives or to provide fiscal incentives for communities to host waste isolation facilities. Two facility characteristics which necessitate these actions are singled out for attention. First, because the facility is federally owned, it is not liable for state and local taxes and may be viewed by communities as a fiscal liability. Several types of payment plans to correct this deficiency are examined. The major conclusion is that while removal of disincentives or creation of incentives is possible, plans based on cost compensation that fail to consider opportunity costs cannot create incentives and are likely to create disincentives. Second, communities other than that in which the facility is sited may experience costs due to the siting and may, therefore, oppose it. These costs (which also accrue to the host community) arise due to the element of risk which the public generally associates with proximity to the transport and storage of radioactive materials. It is concluded that under certain circumstances compensatory payments are possible, but that measuring these costs will pose difficulty.

  13. Stormwater Management for Federal Facilities under Section 438 of the Energy Independence and Security Act

    EPA Pesticide Factsheets

    Federal agencies are required to reduce stormwater runoff from federal development and redevelopment projects to protect water resources. Options include a variety of stormwater management practices like green infrastructure or low impact development

  14. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  15. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, April 15, 2011 at 9 a.m. (Pacific Time). b...

  16. 76 FR 76709 - Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... [Federal Register Volume 76, Number 236 (Thursday, December 8, 2011)] [Notices] [Pages 76709-76710] [FR Doc No: 2011-31488] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12642-003 North Carolina] Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental...

  17. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps...

  18. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, May 6, 2011 at 1 p.m. (Pacific Time). b...

  19. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental..., Iowa, at the U.S. Army Corps of Engineers' Red Rock Dam. Staff prepared an environmental assessment...

  20. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... their costs. (c) FEMA will inform the licensee in writing of the Federal support which will be...

  1. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... their costs. (c) FEMA will inform the licensee in writing of the Federal support which will be...

  2. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... their costs. (c) FEMA will inform the licensee in writing of the Federal support which will be...

  3. 77 FR 59627 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... excess or surplus Federal property. This Notice is also published in order to comply with the December 12..., 2012. Ann Marie Oliva, Deputy Assistant Secretary (Acting) for Special Needs. TITLE V, FEDERAL SURPLUS...

  4. 78 FR 35950 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... identifies unutilized, underutilized, excess, and surplus Federal property reviewed by HUD for suitability... excess or surplus Federal property. This Notice is also published in order to comply with the December 12... SURPLUS PROPERTY PROGRAM FEDERAL REGISTER REPORT FOR 06/14/2013 Suitable/Available Properties Building...

  5. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of ridesharing (carpools, vanpools, privately leased buses, public transportation, and other multi..., improve air quality, and provide an economical way for Federal employees to commute to work. (b) In accordance with the Federal Employees Clean Air Incentives Act (Public Law 103-172), the Federal...

  6. Investigation of a Chlamydia pneumoniae Outbreak in a Federal Correctional Facility in Texas

    PubMed Central

    Conklin, Laura; Adjemian, Jennifer; Loo, Jennifer; Mandal, Sema; Davis, Carol; Parks, Sharyn; Parsons, Tina; McDonough, Brian; Partida, Jorge; Thurman, Kathleen; Diaz, Maureen H.; Benitez, Alvaro; Pondo, Tracy; Whitney, Cynthia G.; Winchell, Jonas M.; Kendig, Newton; Van Beneden, Chris

    2015-01-01

    Background Chlamydia pneumoniae illness is poorly characterized, particularly as a sole causative pathogen. We investigated a C. pneumoniae outbreak at a federal correctional facility. Methods We identified inmates with acute respiratory illness (ARI) from 1 November 2009 to 24 February 2010 through clinic self-referral and active case finding. We tested oropharyngeal and/or nasopharyngeal swabs for C. pneumoniae by real-time polymerase chain reaction (qPCR) and serum samples by microimmunofluorescence. Cases were inmates with ARI and radiologically confirmed pneumonia, positive qPCR, or serological evidence of recent infection. Swabs from 7 acutely ill inmates were tested for 18 respiratory pathogens using qPCR TaqMan Array Cards (TACs). Follow-up swabs from case patients were collected for up to 8 weeks. Results Among 33 self-referred and 226 randomly selected inmates, 52 (20.1%) met the case definition; pneumonia was confirmed in 4 by radiology only, in 9 by qPCR only, in 17 by serology only, and in 22 by both qPCR and serology. The prison attack rate was 10.4% (95% confidence interval, 7.0%–13.8%). White inmates and residents of housing unit Y were at highest risk. TAC testing detected C. pneumoniae in 4 (57%) inmates; no other causative pathogens were identified. Among 40 inmates followed prospectively, C. pneumoniae was detected for up to 8 weeks. Thirteen (52%) of 25 inmates treated with azithromycin continued to be qPCR positive >2 weeks after treatment. Conclusions Chlamydia pneumoniae was the causative pathogen of this outbreak. Higher risk among certain groups suggests that social interaction contributed to transmission. Persistence of C. pneumoniae in the oropharynx creates challenges for outbreak control measures. PMID:23723194

  7. 77 FR 17125 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    .... ft. each, most recent use--communications Facility 1 OTHB Radar Site Christmas Valley CA 97641... recent use--communications Facility 2 OTHB Radar Site Christmas Valley CA 97641 Landholding Agency: Air... shop Facility 4 OTHB Radar Site Christmas Valley CA 97641 Landholding Agency: Air Force Property Number...

  8. 76 FR 14590 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Regulation Supplement; Safety of Facilities, Infrastructure, and Equipment for Military Operations (DFARS... Authorization Act for Fiscal Year 2010. Section 807 requires that facilities, infrastructure, and equipment that.... Facilities, infrastructure, and equipment shall be inspected prior to use to ensure safety and...

  9. 75 FR 66683 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Regulation Supplement; Safety of Facilities, Infrastructure, and Equipment for Military Operations (DFARS... Authorization Act of 2010. Section 807 requires that facilities, infrastructure, and equipment that are intended... Requirements, to add section 246.270, Safety of Facilities, Infrastructure, and Equipment for...

  10. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    SciTech Connect

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  11. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ...; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for... Generating Facility Trust No. 1 (co-licensees) and Brown Bear Power, LLC (transferee) filed an application... Partnership: Christine M. Miller, Brown Bear GP, LLC, c/o ArcLight Capital Partners, LLC, 200 Clarendon Street...

  12. Oak Ridge Reservation Federal Facility Agreement: Quarterly report for the Environmental Restoration Program. Volume 2, January--March 1996

    SciTech Connect

    1996-04-01

    This report provides information about ER Program activities conducted on the Oak Ridge Reservation under the Federal Facility Agreement (FFA). Specifically, it includes information on milestones scheduled for completion during the reporting period as well as scheduled for completion during the next reporting period (quarter), accomplishments of the ER Program, concerns related to program work, and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  13. 77 FR 31376 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Mark Johnston at the address listed at the beginning of this Notice. Included in the request for review...-ZS, Room 8536, 2511 Jefferson Davis Hwy, Arlington, VA 22202; GSA: Mr. John E.B. Smith, General.... Johnston, Deputy Assistant Secretary for Special Needs. TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM FEDERAL...

  14. 77 FR 7245 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... February 10, 2012 Part II Department of Housing and Urban Development Federal Property Suitable as..., 2012 / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  15. 78 FR 53821 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... August 30, 2013 Part II Department of Housing and Urban Development Federal Property Suitable as..., 2013 / Notices#0;#0; ] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Property Suitable as... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  16. 76 FR 77432 - Coordination of Federal Authorizations for Electric Transmission Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... entities to inform DOE of requests for authorizations required under Federal law for Qualifying Projects as... administrative record, for Qualifying Projects. In addition, the proposed rule provides for the establishment of... Federal laws shall be completed within one year, or as soon thereafter as practicable in compliance with...

  17. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  18. 78 FR 31572 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... is publishing this Notice to identify Federal buildings and other real property that HUD has reviewed... provided to HUD by Federal landholding agencies regarding unutilized and underutilized buildings and real... property will be required to relocate the building to their own site at their own expense. Homeless...

  19. 41 CFR 102-74.205 - What Federal facility ridesharing policy must Executive agencies follow?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., improve air quality, and provide an economical way for Federal employees to commute to work. (b) In... for the establishment of programs that encourage Federal employees to commute to work by means other than single-occupancy motor vehicles. (c) In accordance with the Transportation Equity Act for the...

  20. 76 FR 68498 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ...-1234; TTY number for the hearing- and speech-impaired (202) 708-2565 (these telephone numbers are not..., Federal Surplus Property Program Federal Register Report for 11/04/2011 Suitable/Available Properties Building Illinois Trailer 035 Fermi Nat'l Accelerator Lab Batavia IL 60510 Landholding Agency: Energy...

  1. 75 FR 3750 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ...) 708-1234; TTY number for the hearing- and speech-impaired (202) 708-2565 (these telephone numbers are... Secretary for Special Needs. TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM FEDERAL REGISTER REPORT FOR 01/22... ] Unsuitable Properties Building New Mexico 4 Bldgs. Los Alamos National Lab Los Alamos NM 87545 Landholding...

  2. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (a) The State, local or tribal agency responsible for implementing and enforcing the SIP or TIP can... EPA as a SIP revision; (7) The SIP revision must be approved by EPA. (b) The facility-wide budget... facility budget adopted pursuant to paragraph (a) of this section are “presumed to conform” to the SIP...

  3. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (a) The State, local or tribal agency responsible for implementing and enforcing the SIP or TIP can... EPA as a SIP revision; (7) The SIP revision must be approved by EPA. (b) The facility-wide budget... facility budget adopted pursuant to paragraph (a) of this section are “presumed to conform” to the SIP...

  4. 40 CFR 93.161 - Conformity evaluation for Federal installations with facility-wide emission budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (a) The State, local or tribal agency responsible for implementing and enforcing the SIP or TIP can... EPA as a SIP revision; (7) The SIP revision must be approved by EPA. (b) The facility-wide budget... facility budget adopted pursuant to paragraph (a) of this section are “presumed to conform” to the SIP...

  5. Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

    SciTech Connect

    Not Available

    1980-05-01

    The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

  6. 75 FR 39573 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... law, subject to screening for other Federal use. At the appropriate time, HUD will publish the...: Extensive deterioration New Jersey Bldg. 544 Naval Weapons Station Colts Neck NJ 07722 Landholding Agency...

  7. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... and agencies; and (2) Shall assume that, in the event of an actual radiological emergency or disaster...

  8. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... assumption that, in the event of an actual radiological emergency or disaster, State and local authorities...

  9. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... and agencies; and (2) Shall assume that, in the event of an actual radiological emergency or disaster...

  10. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... assumption that, in the event of an actual radiological emergency or disaster, State and local authorities...

  11. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... assumption that, in the event of an actual radiological emergency or disaster, State and local authorities...

  12. 44 CFR 352.6 - FEMA determination on the commitment of Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER... and agencies; and (2) Shall assume that, in the event of an actual radiological emergency or disaster...

  13. 44 CFR 352.25 - Limitation on committing Federal facilities and resources for emergency preparedness.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.25 Limitation on... assumption that, in the event of an actual radiological emergency or disaster, State and local authorities...

  14. Memorandum of Understanding on Long-Term Stewardship at Federal Facilities in the United States

    EPA Pesticide Factsheets

    The purpose of this Memorandum of Understanding is to provide a common understanding and basis for discussion and coordination between the Environmental Council of the States and relevant federal agencies regarding Long-Term Stewardship.

  15. 3 CFR - Federal Support for the Randolph-Sheppard Vending Facility Program

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... entrepreneurs have provided exceptional customer service to Federal and State employees, the Armed Forces, and... to succeed without limits, earn equal pay for equal jobs, and aspire to full-time,...

  16. The Role of States in Cleanup of Hazardous Waste at Federal Facilities

    DTIC Science & Technology

    1993-09-01

    Avocado Growers, Inc. v. Paul.’-9 In this case the Supreme Court set forth a three-part test to determine if a state law had been preempted by a federal...law. In this case the plaintiffs were engaged in the business of growing, packing, and marketing avocados in Florida. They brought suit in federal court...to enjoin the state officers of California from enforcing a statute which prohibited the transportation or sale of avocados in California containing

  17. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    SciTech Connect

    Hildebrandt, S. G.; Bell, M. C.; Anderson, J. J.; Richey, E. P.; Parkhurst, Z. E.

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  18. 78 FR 48710 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ..., Department of Energy, Office of Engineering & Construction Management, MA-50, 1000 Independence Ave. SW...; Interior: Mr. Michael Wright, Acquisition & Property Management, Department of the Interior, 1801... the Navy, Asset Management Division, Naval Facilities Engineering Command, Washington Navy Yard, 1330...

  19. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... OEPs in place, updated annually, periodic testing exercise Required. Assign & train OEP officials... barriers in Level IV and V facilities. (Reproduced from Appendix C, Classification Table, U.S. Department...

  20. Draft Guidance on EPA's New Penalty Order Authority Against Federal Facilities Under the Safe Drinking Water Act Amendments (SDWA) of 1996

    EPA Pesticide Factsheets

    The purpose of this memorandum is to explain new provisions of the Safe Drinking Water Act (SDWA) Amendments of 1996 and to provide guidance on the use of the Agency's authority to issue penalty orders against Federal facilities.

  1. Radiation Detection Field Test at the Federal Express (FedEx) Air Cargo Facility at Denver International Airport (DIA)

    SciTech Connect

    Weirup, D; Waters, A; Hall, H; Dougan, A; Trombino, D; Mattesich, G; Hull, E; Bahowick, S; Loshak, A; Gruidl, J

    2004-02-11

    Lawrence Livermore National Laboratory (LLNL) recently conducted a field-test of radiation detection and identification equipment at the air cargo facility of Federal Express (FedEx) located at Denver International Airport (DIA) over a period of two weeks. Comprehensive background measurements were performed and were analyzed, and a trial strategy for detection and identification of parcels displaying radioactivity was implemented to aid in future development of a comprehensive protection plan. The purpose of this project was threefold: {sm_bullet} Quantify background radiation environments at an air cargo facility. {sm_bullet} Quantify and identify ''nuisance'' alarms. {sm_bullet} Evaluate the performance of various isotope identifiers deployed in an operational environment (in this case, the operational environment included the biggest blizzard in over 90 years!).

  2. Decontamination and treatment of high level liquid mixed waste to meet regulatory compliance issues outlined in Federal Facilities Agreements

    SciTech Connect

    Gaughan, T.P.; Taylor, G.A.

    1994-03-01

    High-Level Radioactive Liquid waste is stored in underground storage tanks at the US Department of Energy`s Savannah River Site (SRS) located south of Aiken, SC. Treatment and disposal of this liquid Hazardous and Radioactive (Mixed) Waste required the negotiation and approval of a Federal Facility Agreement (FFA) between the DOE, EPA and the South Carolina state regulatory agency. This agreement which also addresses many other waste sites at SRS was approved in January 1993. Included in this FFA were schedule information, operating parameters and secondary containment requirements that the DOE committed to as part of an ongoing Environmental Restoration mission at the site. Obtaining compliance with this FFA and other environmental regulations at such a unique facility provided a challenging obstacle for treatment of this liquid waste.

  3. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  4. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  5. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    SciTech Connect

    Not Available

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  6. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  7. Guidebook to excellence: A directory of federal facilities and other resources for mathematics and science education improvement. [Contains acronym list

    SciTech Connect

    Shipman, T.

    1993-01-01

    The Guidebook to Excellence is a State-by-State directory of Federal facilities and other resources for improving mathematics and science education. This directory, the first of its kind, is being published to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal No. 4: By the year 2000, US students will be first in the world in science and mathematics achievement. Some of the larger research facilities in this directory, such as those of NASA, EPA and the Departments of Energy, Commerce, and the Interior, provide a wide range of education programs, and some offer students and teachers hands on experience with state-of-the-art research in world class facilities. Other sites, such as those of the Department of Transportation or Agriculture may be quite small, but can provide assistance in a single field of research or workforce expertise. Also listed are individuals responsible for State or regional coordination of major programs, such as the US Department of Education's Eisenhower Mathematics and Science Education Program, or the National Science Foundation's Statewide Systemic Initiative Program. In addition, each State listing includes facilities or coordinators providing regional assistance from neighboring States.

  8. HEMP (High-Altitude Electromagnetic Pulse) validation of FAA (Federal Aviation Administration) radio facility

    NASA Astrophysics Data System (ADS)

    Sanders, Stephen C.

    1989-05-01

    The Harry Diamond Lab. provided high-altitude electromagnetic pulse (HEMP) and partial lightning hardness verification testing to a high-frequency radio facility for the FAA. The facility consisted of a shielded enclosure with antennas and cables connected through protective devices at the shield to dummy loads within the shield. It was exposed to low-level radiation with measurements of internal fields extrapolated to threat levels and compared to specific criteria. Each typical penetration was injected with a simulated lightning source, and internal measurements were compared to specific criteria. Although criteria were not always met, it was judged with confidence that the facility would protect radio equipment. It was noted that the ac power spark gap would remain shorted until ac power shut down, resulting in system upset.

  9. 75 FR 62414 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ... No: 2010-25025] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-39] Federal... Community Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice identifies unutilized..., Department of Housing and Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410...

  10. 77 FR 29680 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ...: 2012-11736] DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-19] Federal Property... Planning and Development, HUD. ACTION: Notice. SUMMARY: This Notice identifies unutilized, underutilized... homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451...

  11. 76 FR 22095 - Clean Air Act: Opportunity To Comment, Activities Required by Federal Facilities Compliance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... related state and federal implementing regulations at the following coal-fired power plants: The Allen Fossil Plant located in Shelby County, Memphis, Tennessee; the Bull Run Fossil Plant, located in Anderson County, Clinton, Tennessee; the Colbert Fossil Plant, located in Colbert County, Tuscumbia, Alabama; the...

  12. 77 FR 14411 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... line at 1-800- 927-7588 for detailed instructions or write a letter to Mark Johnston at the address... & Construction Management, MA-50, 1000 Independence Ave. SW., Washington, DC 20585, (202) 586-5422; GSA: Mr. John...). Dated: March 1, 2012. Mark R. Johnston, Deputy Assistant Secretary for Special Needs. TITLE V, FEDERAL...

  13. 78 FR 7442 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... (42 U.S.C. 11411), as amended, HUD is publishing this Notice to identify Federal buildings and other... underutilized buildings and real property controlled by such agencies or by GSA regarding its inventory of... property will be required to relocate the building to their own site at their own expense. Homeless...

  14. 77 FR 38850 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND... for use to assist the homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing..., lead, & high level of radon; needs remediation Virginia Building 2113 Marine Corps Base Quantico...

  15. 77 FR 74492 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ..., Washington, DC, 20310, 571- 256-8145; Energy: Mr. Mark C. Price, Office of Engineering & Construction... Navy, Asset Management Division, Naval Facilities Engineering Command, Washington Navy Yard, 1330... & no alternative method to gain access w/out compromising nat'l security Reasons: Secured Area...

  16. 75 FR 22831 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Housing and Urban Development, 451 Seventh Street, SW., Room 7266, Washington, DC 20410; telephone (202... properties identified in this Notice (i.e., acreage, floor plan, existing sanitary facilities, exact street... & Property Management, Department of the Interior, 1849 C Street, NW., MS2603, Washington, DC 20240; (202...

  17. 75 FR 65366 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ...., Washington, DC 20240; (202) 208-5399; Navy: Mr. Albert Johnson, Director of Real Estate, Department of the Navy, Naval Facilities Engineering Command, Washington Navy Yard, 1330 Patterson Ave., SW., Suite 1000...: 61201040002 Status: Excess Reasons: Extensive deterioration Bldg. 416 Naval Weapons Station Seal Beach...

  18. 75 FR 28634 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Administration, Office of Property Disposal, 18th & F Streets, NW., Washington, DC 20405; (202) 501-0084; Navy: Mr. Albert Johnson, Director, Department of the Navy, Asset Management Div., Naval Facilities Engineering Command, Washington Navy Yard, 1322 Patterson Ave., SE., Suite 1000, Washington, DC 20374-...

  19. 77 FR 22335 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... Property Disposal, 18th & F Streets NW., Washington, DC 20405; (202) 501-0084; Navy: Mr. Steve Matteo, Department of the Navy, Asset Management Division, Naval Facilities Engineering Command, Washington Navy Yard...; current use; office and training room; poor conditions- need repairs Land California Seal Beach RR...

  20. 78 FR 29147 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... Status: Excess Comments: off-site removal only; 13,493 sf.; dining facility; deteriorating; asbestos... & no alternative method to gain access w/out compromising nat'l security Reasons: Secured Area... Status: Unutilized Comments: public access denied & no alternative method to gain access...

  1. 75 FR 68374 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Johnson, Director of Real Estate, Department of the Navy, Naval Facilities Engineering Command, Washington... other real property that HUD has reviewed for suitability for use to assist the homeless. The properties... and underutilized buildings and real property controlled by such agencies or by GSA regarding...

  2. 75 FR 70941 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... Whiteford, Army Corps of Engineers, Director of Real Estate, CEMP-CR, 441 G St., NW., Washington, DC 20314...: Mr. Albert Johnson, Director of Real Estate, Department of the Navy, Naval Facilities Engineering... other real property that HUD has reviewed for suitability for use to assist the homeless. The...

  3. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surveillance cameras with time lapse video recording Recommended. Post signs advising of 24 hour video surveillance Recommended. Lighting: Lighting with emergency power backup Required. Physical Barriers: Extend... Parking Control of Facility Parking Access to government parking should be limited where possible...

  4. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... unauthorized vehicles Required. ID system and procedures for authorized parking (placard, decal, card key, etc... identifying vehicles and corresponding parking spaces (placard, decal, card key, etc.) Adequate Lighting for... barriers in Level IV and V facilities. (Reproduced from Appendix C, Classification Table, U.S. Department...

  5. 77 FR 76509 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for... homeless. FOR FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451... and section 501 of the Stewart B. McKinney Homeless Assistance Act (42 U.S.C. 11411), as amended,...

  6. 75 FR 44975 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community... homeless. DATES: Effective Date: July 30, 2010. FOR FURTHER INFORMATION CONTACT: Kathy Ezzell, Department... INFORMATION: In accordance with the December 12, 1988 court order in National Coalition for the Homeless...

  7. Vancouver's supervised injection facility granted constitutional exemption from federal drug law.

    PubMed

    2008-12-01

    In a landmark decision on 27 May 2008, the B.C. Supreme Court held that because Insite--North America's only supervised injection facility (SIF)--provided health care, denial of access to Insite and safe injection would threaten individuals' rights to life, liberty and security of the person.

  8. 76 FR 76984 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... lead based paint, asbestos, and mold in all bldgs.; sq. ft. varies; current use: office 5 Bldgs. Ft..., asbestos, and mold; sq. ft. varies; current use: office 10 Bldgs. Ft. Knox Ft. Knox KY 40121 Landholding... storage; possible asbestos and mold Maryland 13 Bldgs. Naval Support Facility Larderock MD Landholding...

  9. 76 FR 47835 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... for the IRF prospective payment system (PPS) case-mix groups and a description of the methodology and... research and computations used to support an un-weighted regression methodology. ] Response: We provided... 42 CFR Part 412 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for...

  10. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico AGENCY: Bureau of Reclamation, Interior...

  11. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995

    SciTech Connect

    1996-01-01

    This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  12. The National Environmental Committee: A Proposal to Relieve Regulatory Gridlock at Federal Facility Superfund Sites

    DTIC Science & Technology

    1996-04-01

    search of Life Science library, within the subcategory People in Life Science, under " Rachel Louise Carson "). 58 James J. King, Assessing the Mess...ENVIRONMENTAL LAW 23 (2d ed. 1972) see also infra note 65 (discussing the effects of population and conservation on the environment). 5*7 RACHEL CARSON ...with a few causes celebre centering around the preservation of a resource. To Rachel Carson , the resource was birds whose 22 The federal courts also

  13. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  14. Alaska Power Administration federal power program financial statements with supplementary information September 30, 1993 and September 30, 1992 with auditors` reports thereon

    SciTech Connect

    Not Available

    1994-02-14

    The mission of the Alaska Power Administration is to operate and maintain Alaska`s Federal hydroelectric generation and transmission facilities in an efficient, reliable, safe, and environmentally sensitive manner. The power from the facilities is marketed in a manner so as to repay their federal debt and provide widespread use of the power resources at the lowest cost to consumers consistent with sound business principles. This document presents fiscal 1993 accomplishments, future plans, results of operations, sales and revenues, expenses, debt service, repayment status, net cash flow, system reliability, and a report of independent accountants.

  15. Pumped storage for hydroelectric power. (Latest citations from Fluidex data base). Published Search

    SciTech Connect

    Not Available

    1992-09-01

    The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 192 citations and includes a subject term index and title list.)

  16. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC... affected by issuance of a license for the proposed Red River Lock & Dam No. 4 Hydroelectric Project No... Hydroelectric LLC, as applicant for the proposed Red River Lock & Dam No. 4 Project No. 12757, is invited...

  17. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  18. Initiation of TQM at a Federal R D Facility: Early experience

    SciTech Connect

    Wilson, J.S.

    1992-01-01

    The Morgantown Energy Technology Center (METC) is a Federal research and development laboratory that reports to the Assistant Secretary for Fossil Energy of the US Department of Energy (DOE). The laboratory has a wide-ranging mission that involves in-house research activities, procurement, and management of contract research. The Federal staff of 300 employees is about 2/3 professional (engineers, chemists, etc.). A new Director was appointed at METC in April 1990 after 15 years of strong top-down leadership. Among the challenges facing the new Director was a desire to modify the culture'' of the Center to a more participative style coupled with a growing pressure on the efficient use of resource and sustainable worker productivity in the Federal sector. The introduction of a total quality management (TQM) system was viewed as the most appealing proven technique to stimulate the needed changes. A number of activities were undertaken in the fall of 1990 to initiate this program. The Deming Videotapes were used as a training tool to introduce the concepts to the senior managers. Consultants were engaged to train key workers to facilitate'' group work redesign activities, and several pilot projects were completed to illustrate the techniques in real'' work situations. A steering committee that crosscuts the organizations and levels of employees from workers to senior managers was established and has functioned with some success. A new suggestion system has elicited a significant employee input. A recognition system was put in place, and a newsletter has been established to convey the TQM message.

  19. Initiation of TQM at a Federal R&D Facility: Early experience

    SciTech Connect

    Wilson, J.S.

    1992-04-01

    The Morgantown Energy Technology Center (METC) is a Federal research and development laboratory that reports to the Assistant Secretary for Fossil Energy of the US Department of Energy (DOE). The laboratory has a wide-ranging mission that involves in-house research activities, procurement, and management of contract research. The Federal staff of 300 employees is about 2/3 professional (engineers, chemists, etc.). A new Director was appointed at METC in April 1990 after 15 years of strong top-down leadership. Among the challenges facing the new Director was a desire to modify the ``culture`` of the Center to a more participative style coupled with a growing pressure on the efficient use of resource and sustainable worker productivity in the Federal sector. The introduction of a total quality management (TQM) system was viewed as the most appealing proven technique to stimulate the needed changes. A number of activities were undertaken in the fall of 1990 to initiate this program. The Deming Videotapes were used as a training tool to introduce the concepts to the senior managers. Consultants were engaged to train key workers to ``facilitate`` group work redesign activities, and several pilot projects were completed to illustrate the techniques in ``real`` work situations. A steering committee that crosscuts the organizations and levels of employees from workers to senior managers was established and has functioned with some success. A new suggestion system has elicited a significant employee input. A recognition system was put in place, and a newsletter has been established to convey the TQM message.

  20. 77 FR 63811 - FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application.... b. Project No.: 13768-001. c. Date Filed: August 17, 2012. d. Submitted By: Free Flow Power...