Science.gov

Sample records for field project annual

  1. Surfactant-enhanced alkaline flooding field project. Annual report, Revision

    SciTech Connect

    French, T.R.

    1991-10-01

    The Tucker sand of Helper (KS) field is a candidate for surfactant-enhanced alkaline flooding. The geology of the Helper site is typical of many DOE Class I reservoirs. The Tucker sand of Helper field was deposited in a fluvial dominated deltaic environment. Helper oil can be mobilized with either chemical system 2 or chemical system 3, as described in this report. Oil fields in the Gulf Coast region are also good candidates for surfactant-enhanced alkaline flooding. The results from laboratory tests conducted in Berea sandstone cores with oil brine from Helper (KS) field are encouraging. The crude oil is viscous and non-acidic and, yet, was mobilized by the chemical formulations described in this report. Significant amounts of the oil were mobilized under simulated reservoir conditions. The results in Berea sandstone cores were encouraging and should be verified by tests with field core. Consumption of alkali, measured with field core, was very low. Surfactant loss appeared to be acceptable. Despite the good potential for mobilization of Helper oil, certain reservoir characteristics such as low permeability, compartmentalization, and shallow depth place constraints on applications of any chemical system in the Tucker sand. These constraints are typical of many DOE Class I reservoirs. Although Hepler field is not a perfect reservoir in which to apply surfactant- enhanced alkaline flooding, Hepler oil is particularly amenable to mobilization by surfactant-enhanced alkaline systems. A field test is recommended, dependent upon final evaluation of well logs and cores from the proposed pilot area. 14 refs., 21 figs., 10 tabs.

  2. Surfactant-enhanced alkaline flooding field project. Annual report

    SciTech Connect

    French, T.R.; Josephson, C.B.

    1993-12-01

    The Tucker sand from Hepler field, Crawford County, Kansas, was characterized using routine and advanced analytical methods. The characterization is part of a chemical flooding pilot test to be conducted in the field, which is classified as a DOE Class I (fluvial-dominated delta) reservoir. Routine and advanced methods of characterization were compared. Traditional wireline logs indicate that the reservoir is vertically compartmentalized on the foot scale. Routine core analysis, X-ray computed tomography (CT), minipermeameter measurement, and petrographic analysis indicate that compartmentalization and lamination extend to the microscale. An idealized model of how the reservoir is probably structured (complex layering with small compartments) is presented. There was good agreement among the several methods used for characterization, and advanced characterization methods adequately explained the coreflood and tracer tests conducted with short core plugs. Tracer and chemical flooding tests were conducted in short core plugs while monitoring with CT to establish flow patterns and to monitor oil saturations in different zones of the core plugs. Channeling of injected fluids occurred in laboratory experiments because, on core plug scale, permeability streaks extended the full length of the core plugs. A graphic example of how channeling in field core plugs can affect oil recovery during chemical injection is presented. The small scale of compartmentalization indicated by plugs of the Tucker sand may actually help improve sweep between wells. The success of field-scale waterflooding and the fluid flow patterns observed in highly heterogeneous outcrop samples are reasons to expect that reservoir flow patterns are different from those observed with short core plugs, and better sweep efficiency may be obtained in the field than has been observed in laboratory floods conducted with short core plugs.

  3. Field fracturing multi-sites project. Annual report, August 1, 1995--July 31, 1996

    SciTech Connect

    1996-12-31

    The objective of the Field Fracturing Multi-Sites Project (M-Site) is to conduct experiments to definitively determine hydraulic fracture dimensions using remote well and treatment well diagnostic techniques. In addition, experiments are to be conducted to provide data that will resolve significant unknowns with regard to hydraulic fracture modeling, fracture fluid rheology and fracture treatment design. These experiments will be supported by a well-characterized subsurface environment, as well as surface facilities and equipment conducive to acquiring high-quality data. The primary Project goal is to develop a fully characterized, tight reservoir-typical, field-scale hydraulic fracturing test site to diagnose, characterize, and test hydraulic fracturing technology and performance. It is anticipated that the research work being conducted by the multi-disciplinary team of GRI and DOE contractors will lead to the development of a commercial fracture mapping tool/service.

  4. Kalispel Resident Fish Project : Annual Report, 2001.

    SciTech Connect

    Andersen, Todd

    2002-01-01

    In 2001 the Kalispel Natural Resource Department (KNRD) continued assessing habitat and population enhancement projects for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in recommendations from the 1996, 1997, and 1998 annual reports, were monitored during field season 1999, 2000, and 2001. Post assessments were used to evaluate habitat quality, stream morphology and fish populations where enhancement projects were implemented.

  5. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  6. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  7. SIMBIOS Project; 2003 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  8. Kalispel Resident Fish Project : Annual Report, 1997.

    SciTech Connect

    Donley, Christopher; Lockwoood, Jr., Neil

    1997-01-01

    In 1997 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in the recommendations from the 1996 annual report, were conducted during field season 1997. Fencing and planting of riparian areas and instream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. This season also began the first year of post-assessment monitoring and evaluation of measures implemented during 1996. The largemouth bass hatchery construction was completed in October and the first bass were introduced to the facility that same month. The first round of production is scheduled for 1998.

  9. Steam Generator Group Project. Annual report, 1982

    SciTech Connect

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided.

  10. Oregon Migrant Health Project, 1971 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In its 9th year of providing migrant health services through a U.S. Public Health Service Continuing Migrant Health Act grant, this Oregon Migrant Health Project annual report is concerned with (1) the health services provided during the 1970-71 harvest season through a contractual arrangement between the Oregon State Health Division and 10 county…

  11. Oregon Migrant Health Project, 1970 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    The 1970 annual report on the Oregon Migrant Health Project discusses health services for migrant agricultural workers and their families (approximately 30,000 individuals) who worked and lived temporarily in various Oregon counties. As noted, some 9,000 of the 30,000 migrants were estimated to be in need of some type of medical service. Thus, the…

  12. Governmental Accounting: Comprehensive Annual Financial Report Project.

    ERIC Educational Resources Information Center

    Moncada, Susan M.

    This paper provides student materials for a course project in which students read, analyze, and interpret the information in an actual comprehensive annual financial report (CAFR) of a government entity (a city with a population greater than 40,000), and is based on the actual reviewer's checklist used by the Government Finance Officers…

  13. National Writing Project 2009 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  14. Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and it`s application to mature Minnelusa waterfloods. Annual technical report, January 1993--December 1993

    SciTech Connect

    Pitts, M.J.

    1995-02-01

    The combination of an interfacial tension agent and a mobility control agent has the potential to produce additional oil beyond a waterflood. The West Kiehl alkaline-surfactant-polymer project is the most advanced application of this chemical enhanced oil recovery technique. The West Kiehl alkaline-surfactant-polymer flood was initiated in September 1987 as a secondary application after primary recovery. A preliminary analysis of the West Kiehl alkaline-surfactant-polymer flood indicates that incremental oil of 20% of the original stock tank oil in place will be produced above waterflooding. The cost of the incremental oil will be less than $2.50 per incremental barrel. A statistical analysis of approximately 120 Minnelusa oil fields in the Powder River Basin indicates that the original stock tank oil in place exceeds one billion barrels. If the enhanced oil recovery technology implemented at West Kiehl field could be successfully applied to these fields, the potential incremental oil recovery would approach 200 million barrels. This project (1) evaluates the geological deposition environment of West Kiehl and adjacent Minneluse sand reservoirs; (2) compares the production performance results of the best geologic and reservoir performance analogs and select two fields for future study; (3) compares the two best field analogs to the west Kiehl field using numerical simulation; (4) predict results of applying the enhancement technology on two mature Minneluse waterflood analog units using engineering and numerical simulation; (5) predict waterflood and polymer flood performance of the West Kiehl field using numerical simulation.

  15. Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and its application to mature Minnelusa waterfloods. Annual report for the period January 1993--December 1993

    SciTech Connect

    Pitts, M.J.; Surkalo, H.; Mundorf, W.R.

    1994-11-01

    The combination of an interfacial tension agent and a mobility control agent has the potential to produce additional oil beyond a waterflood. The West Kiehl alkaline-surfactant-polymer project is the most advanced application of this chemical enhanced oil recovery technique. The West Kiehl alkaline-surfactant-polymer flood was initiated in September 1987 as a secondary application after primary recovery. A preliminary analysis of the West Kiehl alkaline-surfactant-polymer flood indicates that incremental oil of 20% of the original stock tank oil in place will be produced above waterflooding. The cost of the incremental oil will be less than $2.50 per incremental barrel. A statistical analysis of approximately 120 Minnelusa oil fields in the Powder River Basin indicates that the original stock tank oil in place exceeds one billion barrels. If the enhanced oil recovery technology implemented at West Kiehl field could be successfully applied to these fields, the potential incremental oil recovery would approach 200 million barrels. {open_quotes}Detailed Evaluation of the West Kiehl Alkaline-Surfactant-Polymer Field Project and Its Application to Mature Minnelusa Waterfloods{close_quotes} objective is to evaluate both the field performance of the alkaline-surfactant-polymer enhanced oil recovery technology as well as its potential application to other Minnelusa oil fields.

  16. ENCOAL mild coal gasification project. Annual report

    SciTech Connect

    Not Available

    1993-10-01

    This document is the combination of the fourth quarter report (July--September 1993) and the 1993 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, has completed the construction of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). ENCOAL submitted an application to the US Department of Energy (DOE) in August 1989, soliciting joint funding of the project in the third round of the Clean Coal Technology Program. The project was selected by DOE in December, 1989 and the Cooperative Agreement approved in September, 1990. Construction, commissioning, and start-up of the ENCOAL mild coal gasification facility was completed in June of 1992, and the project is currently in the operations phase. Some plant modifications have been required and are discussed in this report.

  17. Electric Field Imaging Project

    NASA Technical Reports Server (NTRS)

    Wilcutt, Terrence; Hughitt, Brian; Burke, Eric; Generazio, Edward

    2016-01-01

    NDE historically has focused technology development in propagating wave phenomena with little attention to the field of electrostatics and emanating electric fields. This work is intended to bring electrostatic imaging to the forefront of new inspection technologies, and new technologies in general. The specific goals are to specify the electric potential and electric field including the electric field spatial components emanating from, to, and throughout volumes containing objects or in free space.

  18. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 2. Appendix I

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    This appendix to the 1979-1980 annual report contains basic laboratory test reports, detailed instructions, plans and procedures, and various calculated data derived from operating observations. These are considered to be of sufficient interest to warrant their publication, but because of their bulk, to be of too much detail for inclusion in the body of the report. The table of contents specifies each group of data or description as a section which is believed to be complete in itself. The order of inclusion of the various sections has been dictated by the sequence of their reference in the body of the 1979-1980 annual report.

  19. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy's Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  20. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy`s Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  1. Projected changes in the annual wind-wave cycle

    NASA Astrophysics Data System (ADS)

    Stopa, Justin; Hemer, Mark

    2016-04-01

    The uneven distribution of the sun's energy directly and indirectly drives physical atmosphere and ocean processes. This creates intricate spatial patterns within the seasonal cycle where higher order harmonics are seen to play an important role in regional climates. The annual cycle and associated harmonics are the strongest oscillations within the climate system and describe the majority of variance across the oceans. Consequently when studying climate oscillations, it is common practice to remove the seasonal cycle in order to elucidate inter-annual cycles. Furthermore the annual cycle plays an important role in the evolution of other inter-annual oscillations through non-linear coupling (e.g ENSO). Despite the important role of the seasons within the climate system very few studies describe the seasonality with any rigor. Therefore our focus is to describe the higher harmonics linked to the annual cycle and how they are expected to evolve in a changing climate. Using simulations from the Coordinated Ocean Wave Climate Project, the seasonality of multiple mid and end of the 21st century wind-wave climate projections are analyzed relative to historical experiment forced simulations. A comparison of various GCM forced wave simulations to reanalysis datasets reveals that a multi-model ensemble best describes the seasons. This ensemble is used to describe the changes within the wave seasonality. A systematic analysis reveals the primary mode of the seasons is relatively unchanged in the mid and end century. The largest changes occur in the second and third modes. The second mode defines the shift or translation within the seasons while the third mode characterizes relative change between the seasonal extremes (ie sharpening or flattening of the waveform). The relative changes in the second and third modes are not homogeneous and intricate patterns are revealed. Certain regions have sharper contrast in seasonality while other regions have a longer strong season. In

  2. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 3. Appendices II-XVII

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    Volume 3 contains Appendices II through XVII: mixing instructions for sodium orthosilicate; oil displacement studies using THUMS C-331 crude oil and extracted reservoir core material from well B-110; clay mineral analysis of B-827-A cores; sieve analysis of 4 Fo sand samples from B-110-IA and 4 Fo sand samples from B-827-A; core record; delayed secondary caustic consumption tests; long-term alkaline consumption in reservoir sands; demulsification study for THUMS Long Beach Company, Island White; operating plans and instructions for DOE injection demonstration project, alkaline injection; caustic pilot-produced water test graphs; well test irregularities (6/1/79-5/31/80); alkaline flood pump changes (6/1/79-5/31/80); monthly DOE pilot chemical waterflood injection reports (preflush injection, alkaline-salt injection, and alkaline injection without salt); and caustic safety procedures-alkaline chemicals.

  3. Project TRREE 2009-2010 Annual Report

    ERIC Educational Resources Information Center

    Atwell, Nedra

    2010-01-01

    Project TRREE (Teacher Recruitment and Retention for Educational Excellence) is a federally funded project conducted by the Kentucky Department of Education. The purpose of the project is to develop a systemic approach to increase the number of highly qualified special education teachers with a focus on recruitment of linguistically, culturally…

  4. Oregon Migrant Health Project; Annual Progress Report 1969.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In this 1969 annual report, 10 objectives of the Oregon Migrant Health Project--which served approximately 18,400 migrants during the project year--are listed. These objectives relate to providing for diagnostic and medical services, preventive medical services, and dental care, as well as promoting health awareness, education, and improved living…

  5. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  6. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2004-04-01

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  7. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  8. FY 2014 LDRD Annual Report Project Summaries

    SciTech Connect

    Tomchak, Dena

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  9. Bartlesville Project Office FY 1990 Annual report

    SciTech Connect

    Not Available

    1991-04-01

    The Bartlesville Project Office (BPO) was established in 1983 to succeed the Bartlesville Energy Technology Center (BETC). Its lead mission from the Office of Fossil Energy (FE) of the US Department of energy is to plan and implement research in the Enhanced Oil Recovery (EOR) and Advanced Extraction and Process Technology (AEPT) subprograms of the Petroleum Program. As such, BPO oversees some 160 research projects falling within these two broad subprograms and support activities. These projects, form the major portion of DOE's National Petroleum Research Program. The EOR subprogram consists of two research categories: Light Oil and Heavy Oil. These two categories include research activities in: (1) geoscience and reservoir characterization, (2) chemical flooding (3) gas flooding, (4) thermal recovery, (5) novel technology, and (6) microbial EOR. The AEPT subprogram includes research activities in (1) fundamental geoscience and extraction research, (2) supporting technology and environmental research, and (3) university geoscience research. 8 figs., 5 tabs.

  10. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect

    Andersen, Todd

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  11. LLNL NESHAPs project 1997 annual report

    SciTech Connect

    Gallegos, G.M.

    1998-06-01

    NESHAP`s limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 ({mu}Sv) to any member of the public The EDEs for the Lawrence Livermore National Laboratory (LLNL) site- wide maximally exposed members of the public from 1997 operations were Livermore site. 0 097 mrem (0 97 {mu}Sv) (80% from point-source emissions), 20% from diffuse-source emissions), Site 300 0 014 mrem (O 14 {mu}Sv) (38% from point-source emissions, 62% from diffuse-source emissions) The EDEs were generally calculated using the EPA-approved CAP88-PC air- dispersion/dose-assessment model Site-specific meteorological data, stack flow data, and emissions estimates based on radionuclide inventory data or continuous-monitoring systems data were the specific input to CAP88-PC for each modeled source.

  12. LLNL NESHAPs project. 1992 annual report

    SciTech Connect

    Surano, K.A.; Failor, R.A.; Biermann, A.H.; Berger, R.L.; Harrach, R.J.

    1993-05-01

    This report summarizes work conducted during FY 1992 for the Environmental Monitoring and Analysis Division of the Environmental Protection Department at Lawrence Livermore National Laboratory (LLNL). This document contains information regarding environmental monitoring of a wide variety of radioisotopes which are emitted to the atmosphere. These radioisotopes include transuranics, biomedical tracers, tritium, mixed fission products, and other radioisotopes used for general research and nuclear weapons research. Information regarding radionuclide air emissions for each of the 56 buildings at LLNL where radionuclides are used or activation products occur is given. Detailed information is included for all point source emissions from 43 LLNL site buildings. In addition, dose equivalents and dose assessment are evaluated. Reported annual releases are based on inventory data and unabated EPA potential release fractions for unmonitored sources, and on actual emission measurements for continuously monitored facilities.

  13. National Writing Project 2008 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2008

    2008-01-01

    Writing in its many forms is the signature means of communication in the 21st century. This simple truth heightens the urgency to help all of our nation's students become strong writers and effective communicators. The National Writing Project (NWP) pursues this goal by focusing the knowledge, expertise, and leadership of the nation's educators on…

  14. Annual Energy Outlook 2009 with Projections to 2030

    SciTech Connect

    2009-03-01

    The Annual Energy Outlook 2009 (AEO2009), prepared by the Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA’s National Energy Modeling System (NEMS). EIA published an “early release” version of the AEO2009 reference case in December 2008.

  15. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  16. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  17. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  18. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  19. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  20. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    SciTech Connect

    Not Available

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies.

  1. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect

    1995-01-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  2. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  3. Kalispel Resident Fish Project : Annual Report, 1995.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  4. Hangman Restoration Project, Annual Report 2002-2003.

    SciTech Connect

    Coeur d'Alene Tribe

    2003-10-01

    Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is

  5. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    SciTech Connect

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na{sub 2}NiFe(CN){sub 6}, and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na{sub 2}NiFe(CN){sub 6} in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH){sub 2} and soluble Na{sub 4}Fe(CN){sub 6}. The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly.

  6. StreamNet Project : Annual Report Fiscal Year 2008.

    SciTech Connect

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12

    development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project

  7. Pinon pine project. Annual report, January 1995--December 1995

    SciTech Connect

    1996-04-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the U.S. Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit will be designated as Tracy Unit No. 4. SPPCo, the project participant, has contracted with the Foster Wheeler USA Corporation (FW USA) for the overall project management, engineering, procurement and construction of the project. FW USA in turn has subcontracted with The M.W. Kellogg Company (MWK) for the engineering and procurement of key components for the Gasifier Island.

  8. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect

    1994-11-01

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  9. Umatilla River Subbasin Fish Habitat Improvement Project, 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation of 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  10. Umatilla Basin Habitat Improvement Project; 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation OF 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  11. Annual energy outlook 1999, with projections to 2020

    SciTech Connect

    1998-12-01

    The Annual Energy Outlook 1999 (AEO99) presents midterm forecasts of energy supply, demand, and prices through 2020 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA`s National Energy Modeling System (NEMS). The report begins with an Overview summarizing the AEO99 reference case. The next section, Legislation and Regulations, describes the assumptions made with regard to laws that affect energy markets and discusses evolving legislative and regulatory issues. Issues in Focus discusses current energy issues--the economic decline in East Asia, growth in demand for natural gas, vehicle emissions standards, competitive electricity pricing, renewable portfolio standards, and carbon emissions. It is followed by the analysis of energy market trends. The analysis in AEO99 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present a summary of the reference case forecasts in units of oil equivalence and household energy expenditures. The AEO99 projections are based on Federal, State, and local laws and regulations in effect on July 1, 1998. Pending legislation and sections of existing legislation for which funds have not been appropriated are not reflected in the forecasts. Historical data used for the AEOI99 projections were the most current available as of July 31, 1998, when most 1997 data but only partial 1998 data were available.

  12. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  13. Umatilla River Subbasin Fish Habitat Improvement Project, 1989 Annual Report.

    SciTech Connect

    Bailey, Timothy D.

    1989-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 17 cooperative lease agreements with private landowners, design and layout of 8.6 miles of Riparian enclosure fence and 3.0 miles of instream structures, development of five fencing contracts and six instream work contracts. Results include implementation of 10 miles of fencing and 3 miles of instream work. Other activities undertaken during this report period are: data collection from 90 habitat monitoring transects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of all age groups on habitat improvement and protection.

  14. Umatilla Basin Habitat Improvement Project; 1989 Annual Report.

    SciTech Connect

    Bailey, Timothy D.

    1990-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 17 cooperative lease agreements with private landowners, design and layout of 8.6 miles of Riparian exclosure fence and 3.0 miles of instream structures, development of five fencing contracts and six instream work contracts. Results include implementation of 10 miles of fencing and 3 miles of instream work. Other activities undertaken during this report period are: data collection from 90 habitat monitoring transects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of all age groups on habitat improvement and protection.

  15. Annual Report for 2003 Wild Horse Research and Field Activities

    USGS Publications Warehouse

    Ransom, Jason; Singer, Francis J.; Zeigenfuss, Linda C.

    2004-01-01

    This report is meant to highlight the activities of the 2003 field season, as well as to provide a general overview of the data collected. More in-depth data analysis will be conducted following the conclusion of each I phase of the research project, and in many cases will not be possible until several seasons of data are collected.

  16. Advanced Turbine Technology Applications Project (ATTAP). 1944 Annual report

    SciTech Connect

    1995-06-01

    This report summarizes work performed in development and demonstration of structural ceramics technology for automotive gas turbine engines. At the end of this period, the project name was changed to ``Ceramic Turbine Engine Demonstration Project``, effective Jan. 1995. Objectives are to provide early field experience demonstrating the reliability and durability of ceramic components in a modified, available gas turbine engine application, and to scale up and improve the manufacturing processes for ceramic turbine engine components and demonstrate the application of these processes in the production environment. The 1994 ATTAP activities emphasized demonstration and refinement of the ceramic turbine nozzles in the AlliedSignal/Garrett Model 331-200[CT] engine test bed in preparation for field testing; improvements in understanding the vibration characteristics of the ceramic turbine blades; improvements in critical ceramics technologies; and scaleup of the process used to manufacture ceramic turbine components.

  17. Annual Energy Outlook 2013 with Projections to 2040

    SciTech Connect

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  19. Annual energy outlook 2009 with projections to 2030

    SciTech Connect

    2009-03-15

    The Annual Energy Outlook 2009 (AEO009), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA's National Energy Modeling System (NEMS). EIA published an 'early release' version of the AEO009 reference case in December 2008. The report begins with an 'Executive Summary' that highlights key aspects of the projections. It is followed by a 'Legislation and Regulations' section that discusses evolving legislation and regulatory issues, including a summary of recently enacted legislation, such as the Energy Improvement and Extension Act of 2008 (EIEA2008). The next section, 'Issues in Focus,' contains discussions of selected topics, including: the impacts of limitations on access to oil and natural gas resources on the Federal Outer Continental Shelf (OCS); the implications of uncertainty about capital costs for new electricity generating plants; and the result of extending the Federal renewable production tax credit (PTC). It also discusses the relationship between natural gas and oil prices and the basis of the world oil price and production trends in AEO2009.

  20. Annual energy outlook 1998 with projections to 2020

    SciTech Connect

    1997-12-01

    The Annual Energy Outlook 1998 (AEO98) is the first AEO with projections to 2020. Key issues for the forecast extension are trends in energy efficiency improvements, the effects of increasing production and productivity improvements on energy prices, and the reduction in nuclear generating capacity. Projections in AEO98 also reflect a greater shift to electricity market restructuring. Restructuring is addressed through several changes that are assumed to occur in the industry, including a shorter capital recovery period for capacity expansion decisions and a revised financial structure that features a higher cost of capital as the result of higher competitive risk. Both assumptions tend to favor less capital-intensive generation technologies, such as natural gas, over coal or baseload renewable technologies. The forecasts include specific restructuring plans in those regions that have announced plans. California, New York, and New England are assumed to begin competitive pricing in 1998. The provisions of the California legislation for stranded cost recovery and price caps are incorporated. In New York and New England, stranded cost recovery is assumed to be phased out by 2008.

  1. USDA area-wide project for annual grasses: outcomes and impacts

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This document provides a record of the research, outreach, education and technology transfer that was completed as part of the area-wide project for invasive annual grasses from 2007-2012. The overall goal of the project was to catalyze a holistic integrated management program for invasive annual g...

  2. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits...) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final rule is effective February 24, 2010 and establishes...

  3. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits... (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket... establishes cost limits applicable from January 1, 2012 through December 31, 2012. FOR FURTHER...

  4. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits...) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction.... Applicability date: This final rule establishes cost limits applicable from January 1, 2011 through December...

  5. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits AGENCY... publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for... CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  6. Fateh Field production facility reconfiguration project

    SciTech Connect

    Dorcheus, S.M.; Landis, S.R.; Robertson, C.A.

    1995-10-01

    Modification of the Dubai Petroleum Co. (DPC) Fateh Field central production facility has reduced wellhead pressures about 10% field-wide, resulting in increased oil production and incremental reserve addition. The facility reconfiguration has reduced operating and maintenance problems experienced with separators and inlet piping, while improving oil recovery. A key challenge of the Reconfiguration Project was to devise a separation scheme which redistributed fluid between vessels, and an installation method which utilized existing equipment to the greatest extent possible, eliminated downtime during facility modification, and minimized investment. Several reconfiguration options were identified and evaluated. The evaluation combined computer simulation results of surface gathering and separation facilities with modeling efforts of the primary Fateh reservoirs. the preferred reconfiguration option was justified on the basis of increased oil uplift associated with the wellhead pressure reduction. The project was successfully completed in mid-January 1994. This paper describes methods used to evaluate the identified options, project planning, and project implementation. Predicted and actual results are given, and key project execution steps are described.

  7. Moses Lake Fishery Restoration Project : FY 2000 Annual Report.

    SciTech Connect

    Burgess, Dave

    2003-02-01

    The Moses Lake Project (project No. 199502800) was first funded during FY 99 and field studies commenced October 2000. Later review of the proposal by the ISRP revealed perceived shortcomings. Immediately following the ISRP review Washington Department of Fish and Wildlife (WDFW) personnel were in contact with the Northwest Power Planning Council (NWPPC) regarding further options. The NWPPC allowed WDFW to re-submit the first proposal revision that was followed in June 2001 by a second negative review by the ISRP. In August 2001, the NWPPC authorized a third and final submission of the proposal and limited funding extension. Therefore, proposal revisions and resubmissions limited progress in data collection and analysis. This report covers work conducted within the submitted scope of work (FY 2000, September 27, 2000--September 26, 2001) and incorporation of the suggested modifications to the proposal. The bulk of the work covered by this report concentrated on data collection.

  8. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  9. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  10. Annual energy outlook 1995, with projections to 2010

    SciTech Connect

    1995-01-01

    The Annual Energy Outlook 1995 (AEO95) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projections and analyses of energy supply, demand, and prices through 2010, based on results from the National Energy Modeling System (NEMS). Quarterly forecasts of energy supply and demand for 1995 and 1996 are published in the Short-Term Energy Outlook (February 1995). Forecast tables for the five cases examined in the AEO95 are provided in Appendixes A through C. Appendix A gives historical data and forecasts for selected years from 1992 through 2010 for the reference case. Appendix B presents two additional cases, which assume higher and lower economic growth than the reference case. Appendix C presents two cases that assume higher and lower world oil prices. Appendix D presents a summary of the forecasts in units of oil equivalence. Appendix E presents a summary of household energy expenditures. Appendix F provides detailed comparisons of the AEO95 forecasts with those of other organizations. Appendix G briefly describes NEMS and the major AEO95 forecast assumptions. Appendix H presents a stand-alone high electricity demand case. Appendix 1 provides a table of energy conversion factors and a table of metric conversion factors. 89 figs., 23 tabs.

  11. Annual energy outlook 1994: With projections to 2010

    SciTech Connect

    Not Available

    1994-01-01

    The Annual Energy Outlook 1994 (AEO94) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projects and analyses of energy supply, demand, and prices through 2010, based for the first time on results from the National Energy Modeling System (NEMS). NEMS is the latest in a series of computer-based energy modeling systems used over the past 2 decades by EIA and its predecessor organization, the Federal Energy Administration, to analyze and forecast energy consumption and supply in the midterm period (about 20 years). Quarterly forecasts of energy supply and demand for 1994 and 1995 are published in the Short-Term Energy Outlook (February 1994). Forecast tables for 2000, 2005, and 2010 for each of the five scenarios examined in the AEO94 are provided in Appendices A through E. The five scenarios include a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. Appendix F provides detailed comparisons of the AEO94 forecasts with those of other organizations. Appendix G briefly described the NEMS and the major AEO94 forecast assumptions. Appendix H summarizes the key results for the five scenarios.

  12. Annual energy outlook 1997 with projections to 2015

    SciTech Connect

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA`s National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ``Issues in Focus`` discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs.

  13. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2006

    SciTech Connect

    Johnson, Gary E.; Borde, Amy B.; Dawley, Earl; Diefenderfer, Heida L.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Thom, Ronald M.; Vavrinec, John; Whiting, Allan H.

    2007-12-06

    This report is the third annual report of a six-year project to evaluate the cumulative effects of habitat restoration action in the Columbia River Estuary (CRE). The project is being conducted for the U.S. Army Corps of Engineers (Corps) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory, the Pt. Adams Biological Field Station of the National Marine Fisheries Service, and the Columbia River Estuary Study Taskforce. Measurement of the cumulative effects of ecological restoration projects in the Columbia River estuary is a formidable task because of the size and complexity of the estuarine landscape and the meta-populations of salmonids in the Columbia River basin. Despite the challenges presented by this system, developing and implementing appropriate indicators and methods to measure cumulative effects is the best way to enable estuary managers to track the overall effectiveness of investments in estuarine restoration projects. This project is developing methods to quantify the cumulative effects of multiple restoration activities in the CRE. The overall objectives of the 2006 study were to continue to develop techniques to assess cumulative effects, refine the standard monitoring protocols, and initiate development of an adaptive management system for Corps of Engineers’ habitat restoration monitoring efforts in the CRE. (The adaptive management effort will be reported at a later date.) Field studies during 2006 were conducted in tidal freshwater at Kandoll Farm on the lower Grays River and tidal brackish water at Vera Slough on Youngs Bay. Within each of area, we sampled one natural reference site and one restoration site. We addressed the overall objectives with field work in 2006 that, coupled with previous field data, had specific objectives and resulted in some important findings that are summarized here by chapter in this report. Each chapter of the report contains data on particular monitored variables for pre- and post

  14. Annual Energy Outlook 2011 with Projections to 2035

    SciTech Connect

    2011-04-01

    The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base

  15. Kalispell (i.e. Kalispel) Resident Fish Project : Annual Report, 1996.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Lockwood, Jr., Neil

    1997-08-01

    In 1996 the Kalispell Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). A habitat and population assessment was conducted on Browns Creek a tributary of Cee Cee Ah Creek, one of the priority tributaries outlined in the 1995 annual report. The assessment was used to determine the type and quality of habitat that was limiting to native bull trout and cutthroat trout populations. Analysis of the habitat data indicated high amounts of sediment in the stream, low bank cover, and a lack of winter habitat. Data collected from this assessment was used to prescribe habitat enhancement measures for Browns Creek. Habitat enhancement measures, as outlined in the recommendations from the 1995 annual report, were conducted during field season 1996. Fencing and planting of riparian areas and in stream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. The construction of the largemouth bass hatchery was started in October of 1995. The KNRD, Contractors Northwest Inc. and associated subcontractors are in the process of constructing the hatchery. The projected date of hatchery completion is summer 1997.

  16. Mt. Druitt Early Childhood Project. Third, Fourth, and Fifth Annual Reports to Bernard Van Leer Foundation.

    ERIC Educational Resources Information Center

    Macquarie Univ., North Ryde (Australia). School of Education.

    This series of the third, fourth, and fifth annual reports to the Bernard Van Leer Foundation on the Mt. Druitt Early Childhood Project of Macquarie University, Australia, describes the general activities, program developments, and research activities of the project for the period 1977-1979. The main objective of the project is to develop,…

  17. Oak Grove Fork Habitat Improvement Project, 1988 Annual Report.

    SciTech Connect

    Bettin, Scott

    1989-04-01

    The Lower Oak Grove Fork of the Clackamas River is a fifth-order tributary of the Clackamas River drainage supporting depressed runs of coho and chinook salmon, and summer and winter steelhead. Habitat condition rating for the Lower Oak Grove is good, but smelt production estimates are below the average for Clackamas River tributaries. Limiting factors in the 3.8 miles of the Lower Oak Grove supporting anadromous fish include an overall lack of quality spawning and rearing habitat. Beginning in 1986. measures to improve fish habitat in the Lower Oak Grove were developed in coordination with the Oregon Department of Fish and Wildlife (ODF&W) and Portland General Electric (PGE) fisheries biologists. Prior to 1986, no measures had been applied to the stream to mitigate for PGE's storage and regulation of flows in the Oak Grove Fork (Timothy Lake, Harriet Lake). Catchable rainbow trout are stocked by ODF&W two or three times a year during the trout fishing season in the lowermost portion of the Oak Grove Fork near two Forest Service campgrounds (Ripplebrook and Rainbow). The 1987 field season marked the third year of efforts to improve fish habitat of the Lower Oak Grove Fork and restore anadromous fish production. The efforts included the development of an implementation plan for habitat improvement activities in the Lower Oak Grove Fork. post-project monitoring. and maintenance of the 1986 improvement structures. No new structures were constructed or placed in 1987. Fiscal year 1988 brought a multitude of changes which delayed implementation of plans developed in 1987. The most prominent change was the withdrawal of the proposed Spotted Owl Habitat Area (SOHA) which overlapped the Oak Grove project implementation area. Another was the change in the Forest Service biologist responsible for implementation and design of this project.

  18. Gypsy Field project in reservoir characterization

    SciTech Connect

    Castagna, John P.; Jr., O'Meara, Daniel J.

    2000-01-12

    The overall objective of this project was to use extensive Gypsy Field Laboratory and data as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. This report describes progress since project report DOE/BC/14970-7 and covers the period June 1997-September 1998 and represents one year of funding originally allocated for the year 1996. During the course of the work previously performed, high resolution geophysical and outcrop data revealed the importance of fractures at the Gypsy site. In addition, personnel changes and alternative funding (OCAST and oil company support of various kinds) allowed the authors to leverage DOE contributions and focus more on geophysical characterization.

  19. Gypsy Field Project in Reservoir Characterization

    SciTech Connect

    John P. Castagna; William J. Lamb; Carlos Moreno; Roger Young; Lynn Soreghan

    2000-09-19

    to make predictions other than by exhaustive trial and error. Alternatively, we use the approach of using principle component analysis to reduce the seismic data to a minimum number of significant attributes that explain the variation in the data. These are then correlated to rock properties in order to make predictions. Part II of the report describe our efforts in optimal attributes as applied to the Gypsy data. (3) High Resolution 3D Seismic Processing: When faced with the issue of testing the above methods on the Gypsy dataset, we realized that the 3D seismic data were not processed well and exhibited poor ties to well control. The data was reprocessed with surface consistent predictive deconvolution, muting of wide-angle reflections, min/max exclusion stacking, and F-XY deconvolution. After reprocessing, a good character match with synthetic seismograms was observed. This work was presented at the 2001 SEG Annual Meeting and is included as Part III of this report. (4) Reservoir Characterization Education: The Gypsy project has provided the data for a reservoir characterization module which was added to Depositional Systems and Stratigraphy, a course required for majors in Geology and Geophysics. This module is important because it introduces students to the relevance of sedimentary geology to applied, real-world problems. This work was presented at the Geological Society of America annual meeting (Part IV) and is described on the website for the course (Part V of the report).

  20. Annual Technical Progress Report - West Hackberry Tertiary Project

    SciTech Connect

    Allen Fornea; Bruce Cerveny; Travis H. Gillham

    1997-09-30

    The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. Air injection on the west flank began in November of 1994. Although west flank air injection has increased reservoir pressure by 500 pounds per square inch (psi), production response has not yet occurred. The gas cap on the west flank has not expanded sufficiently to push the oil rim down to the nearest downstructure well.

  1. A Set of Computer Projects for an Electromagnetic Fields Class.

    ERIC Educational Resources Information Center

    Gleeson, Ronald F.

    1989-01-01

    Presented are three computer projects: vector analysis, electric field intensities at various distances, and the Biot-Savart law. Programing suggestions and project results are provided. One month is suggested for each project. (MVL)

  2. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  3. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Astrophysics Data System (ADS)

    1994-07-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  4. Box Canyon Model Watershed Project : Annual Report 1997/1998.

    SciTech Connect

    Kalispel Natural Resource Department

    1998-01-01

    In 1997, the Kalispel Natural Resource Department (KNRD) initiated the Box Canyon Watershed Project. This project will concentrate on watershed protection and enhancement from an upland perspective and will complement current instream restoration efforts implemented through the Kalispel Resident Fish Project. Primary focus of this project is the Cee Cee Ah Creek watershed due to its proximity to the Reservation, importance as a traditional fishery, and potential for bull trout and west-slope cutthroat trout recovery.

  5. On Projecting Discretized Electromagnetic Fields with Unstructured Grids

    SciTech Connect

    Lee, Lie-Quan; Candel, Arno; Kabel, Andrea; Li, Zenghai; /SLAC

    2008-08-13

    A new method for projecting discretized electromagnetic fields on one unstructured grid to another grid is presented in this paper. Two examples are used for studying the errors of different projection methods. The analysis shows that the new method is very effective on balancing both the error of the electric field and that of the magnetic field (or curl of the electric field).

  6. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    SciTech Connect

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  7. Employment Projections and Program Priorities. AIR 1999 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Rosenthal, Dan; Collier, Kitty

    This study compared occupational projections for Alabama with graduation rates in corresponding academic programs to provide a context for state and institutional policy decisions on new program initiatives and to comply with recent program viability legislation. The study examined number of degrees conferred, employment projections, and…

  8. NREL Energy Storage Projects: FY2013 Annual Report

    SciTech Connect

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  9. Kalispel Resident Fish Project, 2004-2005 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2005-06-01

    In 2004 the Kalispel Natural Resource Department (KNRD) implemented a new enhancement monitoring project for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in tributaries to the Pend Oreille River.

  10. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  11. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect

    1981-01-01

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  12. Wasco Riparian Buffer Project, Annual Report 2003-2004.

    SciTech Connect

    Graves, Ron

    2003-07-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

  13. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect

    Graves, Ron

    2004-02-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  14. Pataha [Creek] Model Watershed : 1997 Habitat Projects : Annual Progress Report.

    SciTech Connect

    Bartels, Duane

    1998-10-28

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until this year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream.

  15. Advanced Gas Turbine (AGT) Technology Development Project annual report

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

  16. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  17. Nez Perce Tribal Hatchery Project, 1999 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2001-08-17

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1999 contract Statement Of Work for the Planning and Planning and Design (P and D) and Maintenance (O and M) activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects might also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Division, Department of Fisheries Resource Management (DFRM), and Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Production Division Director and the Production Division Coordinator, as well as the Hatchery Division Coordinator.

  18. Magma Energy Research Project, FY80 annual progress report

    SciTech Connect

    Colp, J.L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  19. UAS Integration in the NAS Project - FY 14 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  20. Control of the gray field slug during annual ryegrass establishment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Weather conditions, in particular soil moisture and soil and air temperature, interact with both crop seedling and slug emergence during the early autumn season. Late, or inadequate autumn rainfall in western Oregon occasionally causes the timing of emergence of newly established annual ryegrass see...

  1. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  2. Project Quinte annual report, 1993. Monitoring report No. 5. Annual publication

    SciTech Connect

    1995-12-31

    This report reviews the activities of Project Quinte, a long-term multi-agency research and monitoring project whose objectives include studying, comparing, and evaluating the Bay of Quinte limnological attributes (biological, physical, and chemical) before and after phosphorus control was implemented at municipal sewage treatment plans. The project also monitors long-term ecosystem responses within the Bay. The report includes papers summarizing research on such topics as phosphorus loadings, hydrology and sediment monitoring, nutrients and phytoplankton, toxic contaminant modeling, benthic fauna, fish populations, and wastewater toxicity.

  3. Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report

    SciTech Connect

    Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

    2013-03-14

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

  4. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect

    Brown, Linda

    2004-01-01

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional

  5. Pend Oreille Wetlands Wildlife Mitigation Projects, 2001 Annual Report.

    SciTech Connect

    Entz, Ray D.

    2001-12-05

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie.

  6. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  7. Fifteenmile Basin Habitat Improvement Project: 1990 Annual Report.

    SciTech Connect

    Asbridge, Gary M.

    1993-12-01

    U.S.D.A. Forest Service activities in the Fifteenmile basin during 1990 involved the placement of 84 log structures in a two mile reach of Fifteenmile Creek (RM 45.4-47.4) by a combination of falling trees into the channel, bucking in blowdown trees spanning the creek, and winching in existing blowdown and log segments from newly fallen trees. The primary project objective on Fifteenmile Creek was to increase physical habitat diversity and rearing habitat for age l+ winter steelhead trout. USFS personnel also conducted spring spawning surveys in sections of Ramsey and Eightmile Creeks, physical habitat pre-project monitoring in the above project reach, water temperature monitoring, and macroinvertebrate sampling.

  8. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  9. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect

  10. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  11. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  12. PCFB repowering project. Annual report, January--December 1993

    SciTech Connect

    Not Available

    1994-04-01

    This report will provide an overview discussion of the {open_quotes}First Generation{close_quotes} Pressurized Circulating Fluidized Bed (PCFB) technology planned for demonstration at DMEC-1. The PCFB Repowering project will demonstrate {open_quotes}First Generation{close_quotes} PCFB technology where steam generated in a PCFB boiler will be used to power a steam turbine and exhaust gases from the PCFB boiler will be expanded through a gas turbine to provide additional power output. The status of each of the activities that have been carried out during the first budget period of the project, primarily in 1993 (including filter testing) will be reviewed.

  13. Rural Women Proprietorship Project. Research and Development Annual Report.

    ERIC Educational Resources Information Center

    Hazard Community Coll., KY.

    A project was created to provide individualized and technical training specially designed for women who desired to become small business owners. Recruitment of eastern Kentucky women in the Hazard Community College five-county service area was done through direct mailing; posting of flyers; and newspaper, radio, and television publicity. In…

  14. Texas State Department of Health Migrant Project. Annual Report 1971.

    ERIC Educational Resources Information Center

    Texas State Dept. of Health Resources, Austin.

    The Texas Migrant Health Project under the State Department of Health aims to: (1) promote and improve medical, dental, and public health services for the domestic agricultural worker and his dependents and (2) encourage and support migrant efforts to participate in and be responsible for personal and family health. During 1969-70, the state was…

  15. Program Improvement Project for Industrial Education. Annual Report.

    ERIC Educational Resources Information Center

    Shaeffer, Bruce W.

    Designed to improve industrial education programs through the development of minimum uniform quality standards, a project developed a task list, educationally sequenced the identified tasks, and developed a recommended shop layout and equipment list for four occupational areas: diesel repair, appliance repair, office machine repair, and small…

  16. Nez Perce Tribal Hatchery Project, 1998 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2000-01-27

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1998 contract Statement Of Work for the Planning and Predesign activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects may also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Services Division, Department of Fisheries Resource Management (DFRM), Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Hatchery Supervisor, the Production Coordinator as well as the Production Director. The Production Director, Ed Larson was absent mos t of January and part of February before he began working part time from home while recovering from back surgery.

  17. Vocational Education Evaluation Project: Annual Report--Fiscal Year 1973.

    ERIC Educational Resources Information Center

    Oliver, J. Dale; And Others

    The primary objective of the Vocational Education Evaluation Project (VEEP) is to develop a management information system for the planning and programing of vocational education. The work has been divided into a macro-system (primarily concerned with guidelines and systematic procedures at the State level) and a micro-system (emphasizing the…

  18. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    SciTech Connect

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  19. Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2009-07-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state

  20. Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

    SciTech Connect

    Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

    2011-10-01

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative

  1. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  2. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  3. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1988.

    SciTech Connect

    Smith, Roger C.; Marx, Steven D.

    1989-04-01

    The goal of the Fifteenmile Creek Habitat Enhancement Project is to improve wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power Administration. Cooperators in the habitat enhancement project include the USDA Forest Service, Wasco County Soil and Water Conservation District and the Confederated Tribes of the Warms Springs. Installation of instream fish habitat structures was completed on four miles of Ramsey Creek and on one mile of Fifteenmile Creek. One hundred thirty-five structures were installed in treatment areas. Construction materials included logs and rock. Riparian protection fencing was completed on Dry Creek and Ramsey Creek worksites. Five and one-half miles of new fence was added to existing fence on Ramsey Creek to afford riparian protection to four miles of stream. Six miles of stream on Dry Creek will be afforded riparian protection by constructing 4.5 miles of fence to complement existing fence. 2 refs., 5 figs.

  4. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    SciTech Connect

    Wingert, Michele; Andersen, Todd

    2008-11-18

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public

  5. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  6. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  7. Title I ESEA Projects: Digest of Annual Evaluations. Supplementary Edition 1976-77. Report No. 77131.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This digest provides a historical summary of the key findings reported in the annual evaluations of each of the Philadelphia, Pennsylvania school district's Title I, Elementary and Secondary Education Act projects since 1975. The 1976-1977 management information, the 1975-1976 key findings, and the preliminary findings for 1976-1977 are presented.…

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  10. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  11. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    SciTech Connect

    Soults, Scott

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  12. NREL Energy Storage Projects. FY2014 Annual Report

    SciTech Connect

    Pesaran, Ahmad; Ban, Chunmei; Burton, Evan; Gonder, Jeff; Grad, Peter; Jun, Myungsoo; Keyser, Matt; Kim, Gi-Heon; Neubauer, Jeremy; Santhanagopalan, Shriram; Saxon, Aron; Shi, Ying; Smith, Kandler; Sprague, Michael; Tenent, Robert; Wood, Eric; Yang, Chuanbo; Zhang, Chao; Han, Taeyoung; Hartridge, Steve; Shaffer, Christian E.

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  13. FY2011 Annual Report for NREL Energy Storage Projects

    SciTech Connect

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  14. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  15. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  16. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  17. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  18. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  19. FY2011 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Tatishvili, Gocha; Hatarik, R.

    2011-10-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for SNM. This project entails isomer identification and characterization and neutron population studies. This document summarizes activities from its third year - completion of the isomer identification characterization experiments and initialization of the neutron population experiments. The population and decay of the isomeric state in 235U remain elusive, although a number of candidate gamma rays have been identified. In the course of the experiments, a number of fission fragment isomers were populated and measured [Ressler 2010]. The decays from these isomers may also provide a suitable signature for the presence of fissile material. Several measurements were conducted throughout this project. This report focuses on the results of an experiment conducted collaboratively by PNNL, LLNL and LBNL in December 2010 at LBNL. The measurement involved measuring the gamma-rays emitted from an HEU target when bombarded with 11 MeV neutrons. This report discussed the analysis and resulting conclusions from those measurements. There was one strong candidate, at 1204 keV, of an isomeric signature of 235U. The half-life of the state is estimated to be 9.3 {mu}s. The measured time dependence fits the decay time structure very well. Other possible explanations for the 1204-keV state were investigated, but they could not explain the gamma ray. Unfortunately, the relatively limited statistics of the measurement limit, and the lack of understanding of some of the systematic of the experiment, limit

  20. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    SciTech Connect

    Patterson, Scott

    2009-04-10

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an

  1. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  2. Albeni Falls Wildlife Mitigation Project, 2001 Annual Report.

    SciTech Connect

    Terra-Burns, Mary

    2002-02-11

    The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres ({approx}4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002.

  3. FY2010 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Miller, Erin A.; Hatarik, R.

    2011-01-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for Special Nuclear Materials (SNM). Future work will include a follow-up measurement scheduled for December 2010 at LBNL. Lessons learned from the July 2010 measurements will be incorporated into these new measurements. Analysis of both the July and December experiments will be completed in a few months. A research paper to be submitted to a peer-reviewed journal will be drafted if the conclusions from the measurements warrant publication.

  4. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    SciTech Connect

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  5. Hydrogen engine performance analysis project. Second annual report

    SciTech Connect

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  6. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  7. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    SciTech Connect

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  8. Native Fish Sanctuary Project - Sanctuary Development Phase, 2007 Annual Report

    USGS Publications Warehouse

    Mueller, Gordon A.

    2007-01-01

    Notable progress was made in 2007 toward the development of native fish facilities in the Lower Colorado River Basin. More than a dozen facilities are, or soon will be, online to benefit native fish. When this study began in 2005 no self-supporting communities of either bonytail or razorback sucker existed. Razorback suckers were removed from Rock Tank in 1997 and the communities at High Levee Pond had been compromised by largemouth bass in 2004. This project reversed that trend with the establishment of the Davis Cove native fish community in 2005. Bonytail and razorback sucker successfully produced young in Davis Cove in 2006. Bonytail successfully produced young in Parker Dam Pond in 2007, representing the first successful sanctuary established solely for bonytail. This past year, Three Fingers Lake received 135 large razorback suckers, and Federal and State agencies have agreed to develop a cooperative management approach dedicating a portion of that lake toward grow-out and (or) the establishment of another sanctuary. Two ponds at River's Edge Golf Course in Needles, California, were renovated in June and soon will be stocked with bonytail. Similar activities are taking place at Mohave Community College, Cerbat Cliffs Golf Course, Cibola High Levee Pond, Office Cove, Emerald Canyon Golf Course, and Bulkhead Cove. Recruitment can be expected as fish become sexually mature at these facilities. Flood-plain facilities have the potential to support 6,000 adult razorback suckers and nearly 20,000 bonytail if native fish management is aggressively pursued. This sanctuary project has assisted agencies in developing 15 native fish communities by identifying specific resource objectives for those sites, listing and prioritizing research opportunities and needs, and strategizing on management approaches through the use of resource-management plans. Such documents have been developed for Davis Cove, Cibola High Levee Pond, Parker Dam Pond, and Three Fingers Lake. We

  9. Columbia River: Terminal fisheries research project. 1994 Annual report

    SciTech Connect

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  10. SELECTIVE CATALYTIC REDUCTION MERCURY FIELD SAMPLING PROJECT

    EPA Science Inventory

    A lack of data still exists as to the effect of selective catalytic reduction (SCR), selective noncatalytic reduction (SNCR), and flue gas conditioning on the speciation and removal of mercury (Hg) at power plants. This project investigates the impact that SCR, SNCR, and flue gas...

  11. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    SciTech Connect

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  12. Modular Pebble Bed Reactor Project, University Research Consortium Annual Report

    SciTech Connect

    Petti, David Andrew

    2000-07-01

    This project is developing a fundamental conceptual design for a gas-cooled, modular, pebble bed reactor. Key technology areas associated with this design are being investigated which intend to address issues concerning fuel performance, safety, core neutronics and proliferation resistance, economics and waste disposal. Research has been initiated in the following areas: · Improved fuel particle performance · Reactor physics · Economics · Proliferation resistance · Power conversion system modeling · Safety analysis · Regulatory and licensing strategy Recent accomplishments include: · Developed four conceptual models for fuel particle failures that are currently being evaluated by a series of ABAQUS analyses. Analytical fits to the results are being performed over a range of important parameters using statistical/factorial tools. The fits will be used in a Monte Carlo fuel performance code, which is under development. · A fracture mechanics approach has been used to develop a failure probability model for the fuel particle, which has resulted in significant improvement over earlier models. · Investigation of fuel particle physio-chemical behavior has been initiated which includes the development of a fission gas release model, particle temperature distributions, internal particle pressure, migration of fission products, and chemical attack of fuel particle layers. · A balance of plant, steady-state thermal hydraulics model has been developed to represent all major components of a MPBR. Component models are being refined to accurately reflect transient performance. · A comparison between air and helium for use in the energy-conversion cycle of the MPBR has been completed and formed the basis of a master’s degree thesis. · Safety issues associated with air ingress are being evaluated. · Post shutdown, reactor heat removal characteristics are being evaluated by the Heating-7 code. · PEBBED, a fast deterministic neutronic code package suitable for

  13. Adiabatic and isocurvature perturbation projections in multi-field inflation

    SciTech Connect

    Gordon, Chris; Saffin, Paul M. E-mail: Paul.Saffin@nottingham.ac.uk

    2013-08-01

    Current data are in good agreement with the predictions of single field inflation. However, the hemispherical asymmetry, seen in the cosmic microwave background data, may hint at a potential problem. Generalizing to multi-field models may provide one possible explanation. A useful way of modeling perturbations in multi-field inflation is to investigate the projection of the perturbation along and perpendicular to the background fields' trajectory. These correspond to the adiabatic and isocurvature perturbations. However, it is important to note that in general there are no corresponding adiabatic and isocurvature fields. The purpose of this article is to highlight the distinction between a field redefinition and a perturbation projection. We provide a detailed derivation of the evolution of the isocurvature perturbation to show that no assumption of an adiabatic or isocurvature field is needed. We also show how this evolution equation is consistent with the field covariant evolution equations for the adiabatic perturbation in the flat field space limit.

  14. The high field superconducting magnet program at LLNL: Annual report

    SciTech Connect

    Miller, J.R.; Chaplin, M.R.; Kerns, J.A.; Leber, R.L.; Rosdahl, A.R.; Slack, D.S.; Summers, L.T.; Zbasnik, J.P.

    1986-12-01

    In FY 86 the program continued along several interrelated thrust areas. These thrust areas have been broadly labeled as follows: (1) Superconductor Research and Technology; (2) Magnet Systems Materials Technology; (3) Magnet Systems Design Technology; (4) High Field Test Facility; and (5) Technology Transfer.

  15. Surfactant-enhanced alkaline flooding field project

    SciTech Connect

    French, T.R.

    1991-10-01

    The Tucker sand of Helper (KS) field is a candidate for surfactant-enhanced alkaline flooding. The geology of the Helper site is typical of many DOE Class I reservoirs. The Tucker sand of Helper field was deposited in a fluvial dominated deltaic environment. Helper oil can be mobilized with either chemical system 2 or chemical system 3, as described in this report. Oil fields in the Gulf Coast region are also good candidates for surfactant-enhanced alkaline flooding. The results from laboratory tests conducted in Berea sandstone cores with oil brine from Helper (KS) field are encouraging. The crude oil is viscous and non-acidic and, yet, was mobilized by the chemical formulations described in this report. Significant amounts of the oil were mobilized under simulated reservoir conditions. The results in Berea sandstone cores were encouraging and should be verified by tests with field core. Consumption of alkali, measured with field core, was very low. Surfactant loss appeared to be acceptable. Despite the good potential for mobilization of Helper oil, certain reservoir characteristics such as low permeability, compartmentalization, and shallow depth place constraints on applications of any chemical system in the Tucker sand. These constraints are typical of many DOE Class I reservoirs. Although Hepler field is not a perfect reservoir in which to apply surfactant- enhanced alkaline flooding, Hepler oil is particularly amenable to mobilization by surfactant-enhanced alkaline systems. A field test is recommended, dependent upon final evaluation of well logs and cores from the proposed pilot area. 14 refs., 21 figs., 10 tabs.

  16. FIELD DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN

    EPA Science Inventory

    The Demonstration of innovative field devices for the measurement of mercury in soil and sediment is being conducted under the EPA's SITE Program in February 2003 at the United States Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee and th...

  17. Annual report for 2004 wild horse research and field activities

    USGS Publications Warehouse

    Ransom, Jason; Singer, Francis J.; Zeigenfuss, Linda; Coates-Markle, Linda

    2005-01-01

    The Bureau of Land Management (BLM) and U.S. Geological Survey-Biological Resources Discipline (USGS/BRD) continued wild horse research in 2004, investigating the strategic research elements of fertility control and population estimation. Fertility control research was focused on the individual-based porcine zonae pellucid (PZP) field trials at the Pryor Mountain Wild Horse Range (WHR), Little Rock Cliffs WHR, and McCullough Peaks Wild Horse Management Area (WHMA). Aerial population estimation research was conducted on a number of western wild horse herds to test different survey techniques as applied to various habitat types and population sizes.

  18. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    SciTech Connect

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  19. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  20. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  1. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  2. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    SciTech Connect

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  3. Field development projects advance in Norwegian Sea

    SciTech Connect

    Vielvoye, R.

    1992-03-30

    This paper reports on the Norwegian Sea, lying between the Norwegian North Sea and the western flank of the Barents Sea, which is set to become Norway's second oil and gas producing province. Oil is scheduled to start to flow near the end of next year when AS Norske Shell places on production 428 million bbl Draugen field in Block 6407/9, about 60 miles off the coast of mid-Norway in the frontier sea area known as Haltenbanken. Two years later, in 1995, Norske Conoco AS will add to the 95,000 b/d from Draugen when it commissions the world's first concrete hull tension leg platform (TLP) in Heidrun field. The TLP is expected to produce 200,000 b/d of oil and move associated gas by pipeline to the Norwegian mainland to feed a worldscale methanol plant planned for construction at Tjeldbergodden. The Norwegian government also has been asked to approve a gas pipeline link between Haltenbanken and the gas export infrastructure in the North Sea.

  4. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    SciTech Connect

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  5. POISON SPIDER FIELD CHEMICAL FLOOD PROJECT, WYOMING

    SciTech Connect

    Douglas Arnell; Malcolm Pitts; Jie Qi

    2004-11-01

    A reservoir engineering and geologic study concluded that approximate 7,852,000 bbls of target oil exits in Poison Spider. Field pore volume, OOIP, and initial oil saturation are defined. Potential injection water has a total dissolved solids content of 1,275 mg/L with no measurable divalent cations. If the Lakota water consistently has no measurable cations, the injection water does not require softening to dissolve alkali. Produced water total dissolved solids were 2,835 mg/L and less than 20 mg/L hardness as the sum of divalent cations. Produced water requires softening to dissolve chemicals. Softened produced water was used to dissolve chemicals in these evaluations. Crude oil API gravity varies across the field from 19.7 to 22.2 degrees with a dead oil viscosity of 95 to 280 cp at 75 F. Interfacial tension reductions of up to 21,025 fold (0.001 dyne/cm) were developed with fifteen alkaline-surfactant combinations at some alkali concentration. An additional three alkaline-surfactant combinations reduced the interfacial tension greater than 5,000 fold. NaOH generally produced the lowest interfacial tension values. Interfacial tension values of less than 0.021 dyne/cm were maintained when the solutions were diluted with produced water to about 60%. Na{sub 2}CO{sub 3} when mixed with surfactants did not reduce interfacial tension values to levels at which incremental oil can be expected. NaOH without surfactant interfacial tension reduction is at a level where some additional oil might be recovered. Most of the alkaline-surfactant-polymer solutions producing ultra low interfacial tension gave type II- phase behavior. Only two solutions produced type III phase behavior. Produced water dilution resulted in maintenance of phase type for a number of solutions at produced water dilutions exceeding 80% dilution. The average loss of phase type occurred at 80% dilution. Linear corefloods were performed to determine relative permeability end points, chemical

  6. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    SciTech Connect

    Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

  7. Variation after projection with a triaxially deformed nuclear mean field

    NASA Astrophysics Data System (ADS)

    Gao, Zao-Chun; Horoi, Mihai; Chen, Y. S.

    2015-12-01

    We implemented a variation after projection (VAP) algorithm based on a triaxially deformed Hartree-Fock-Bogoliubov vacuum state. This is the first projected mean field study that includes all the quantum numbers (except parity), i.e., spin (J ), isospin (T ), and mass number (A ). Systematic VAP calculations with JTA projection have been performed for the even-even s d -shell nuclei with the USDB Hamiltonian. All the VAP ground state energies are within 500 keV above the exact shell model values. Our VAP calculations show that the spin projection has two important effects: (1) the spin projection is crucial in achieving good approximation of the full shell model calculation; (2) the intrinsic shapes of the VAP wave functions with spin projection are always triaxial, while the Hartree-Fock-Bogoliubov methods likely provide axial intrinsic shapes. Finally, our analysis suggests that one may not be possible to associate an intrinsic shape to an exact shell model wave function.

  8. Comparison of the 1984 DOE/EIA annual energy outlook and the 1984 GRI baseline projection

    SciTech Connect

    Ashby, A.; Holtberg, P.; Woods, T.

    1985-01-01

    A comparative analysis of the Gas Research Institute (GRI) Baseline Projection of US Energy Supply and Demand with the DOE/EIA 1984 Annual Energy Outlook shows many similar assumptions, but many cases of widening differences between the projections of primary energy consumption and sector-specific energy consumption. The DOE/EIA expects a faster and more significant decline in the electricity to natural gas price ratio, lower sector-specific end-use prices of refined petroleum products, and a faster growth in industrial raw material energy demand. In contrast to the GRI report, it also omits an estimate of industrial cogeneration and does not retire any exisiting generating capacity. The report examines the basic assumptions and results of both projections using five scenarios. 17 tables.

  9. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    SciTech Connect

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colville Tribes Mitigation Project during the 2006 contract period.

  10. UNOCAL Parachute Creek Shale Oil Project. Monitoring review committee meeting report. Annual meeting, 1987-1988

    SciTech Connect

    Not Available

    1988-05-25

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The support agreement included development of an Environmental Monitoring Plan incorporating existing compliance monitoring and twenty-two supplemental monitoring points for water, air, solid waste, worker health and safety, and socio-economic impacts during the period 1986-1993. A Monitoring Review Committee (MRC) comprised of representatives from the Project, U.S. Department of Treasury, U.S. Department of Energy, U.S. Environmental Protection Agency, and the state convene each year to discuss monitoring information and trends in environmental and health surveillance. This report documents the first annual MRC meeting, held at the Project.

  11. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    SciTech Connect

    1993-10-01

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  12. Differential geometry with a projection: application to double field theory

    NASA Astrophysics Data System (ADS)

    Jeon, Imtak; Lee, Kanghoon; Park, Jeong-Hyuck

    2011-04-01

    In recent development of double field theory, as for the description of the massless sector of closed strings, the spacetime dimension is formally doubled, i.e. from D to D+ D, and the T-duality is realized manifestly as a global O( D, D) rotation. In this paper, we conceive a differential geometry characterized by a O( D, D) symmetric projection, as the underlying mathematical structure of double field theory. We introduce a differential operator compatible with the projection, which, contracted with the projection, can be covariantized and may replace the ordinary derivatives in the generalized Lie derivative that generates the gauge symmetry of double field theory. We construct various gauge covariant tensors which include a scalar and a tensor carrying two O( D, D) vector indices.

  13. Sound guidelines keep Alwyn field N. Sea project on track

    SciTech Connect

    Picard, D.

    1987-04-27

    Key initial guidelines have helped keep the Alwyn North Sea project on track as it heads toward production start-up by the end of 1987. Before detailing the project, elaborating on how these guidelines have shaped it and have been reflected in the work since project conception, some comments on the complex field in British waters and the participants are in order. The Alwyn field is located in the U.K. Blocks 3/9 and 3/4, in the northern North Sea. This is an area which is already quite dense with existing platforms such as Magnus, North Cormorant, Brent, and others. The field is approximately 100 miles northeast of the Shetland Islands, in a water depth of 130 m (422 ft).

  14. Projected increases in the annual flood pulse of the Western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Véliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-01-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research because of its rich biodiversity and the significant role of rainforests in carbon cycling. Climate change has also a direct hydrological impact, and increasing efforts have focused on understanding the hydrological dynamics at continental and subregional scales, such as the Western Amazon. New projections from the Coupled Model Inter-comparison Project Phase 5 ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the upper Amazon river. Using extreme value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 yr. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100 yr return floods). These findings agree with previously projected increases in high extremes under the Special Report on Emissions Scenarios climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amidst a growing literature that more strongly emphasises future droughts and their impact on the viability of the rainforest system over greater Amazonia.

  15. National health expenditure projections: modest annual growth until coverage expands and economic growth accelerates.

    PubMed

    Keehan, Sean P; Cuckler, Gigi A; Sisko, Andrea M; Madison, Andrew J; Smith, Sheila D; Lizonitz, Joseph M; Poisal, John A; Wolfe, Christian J

    2012-07-01

    For 2011-13, US health spending is projected to grow at 4.0 percent, on average--slightly above the historically low growth rate of 3.8 percent in 2009. Preliminary data suggest that growth in consumers' use of health services remained slow in 2011, and this pattern is expected to continue this year and next. In 2014, health spending growth is expected to accelerate to 7.4 percent as the major coverage expansions from the Affordable Care Act begin. For 2011 through 2021, national health spending is projected to grow at an average rate of 5.7 percent annually, which would be 0.9 percentage point faster than the expected annual increase in the gross domestic product during this period. By 2021, federal, state, and local government health care spending is projected to be nearly 50 percent of national health expenditures, up from 46 percent in 2011, with federal spending accounting for about two-thirds of the total government share. Rising government spending on health care is expected to be driven by faster growth in Medicare enrollment, expanded Medicaid coverage, and the introduction of premium and cost-sharing subsidies for health insurance exchange plans. PMID:22692089

  16. National health expenditure projections: modest annual growth until coverage expands and economic growth accelerates.

    PubMed

    Keehan, Sean P; Cuckler, Gigi A; Sisko, Andrea M; Madison, Andrew J; Smith, Sheila D; Lizonitz, Joseph M; Poisal, John A; Wolfe, Christian J

    2012-07-01

    For 2011-13, US health spending is projected to grow at 4.0 percent, on average--slightly above the historically low growth rate of 3.8 percent in 2009. Preliminary data suggest that growth in consumers' use of health services remained slow in 2011, and this pattern is expected to continue this year and next. In 2014, health spending growth is expected to accelerate to 7.4 percent as the major coverage expansions from the Affordable Care Act begin. For 2011 through 2021, national health spending is projected to grow at an average rate of 5.7 percent annually, which would be 0.9 percentage point faster than the expected annual increase in the gross domestic product during this period. By 2021, federal, state, and local government health care spending is projected to be nearly 50 percent of national health expenditures, up from 46 percent in 2011, with federal spending accounting for about two-thirds of the total government share. Rising government spending on health care is expected to be driven by faster growth in Medicare enrollment, expanded Medicaid coverage, and the introduction of premium and cost-sharing subsidies for health insurance exchange plans.

  17. The NASA Seasonal-to-Interannual Prediction Project (NSIPP). [Annual Report for 2000

    NASA Technical Reports Server (NTRS)

    Rienecker, Michele; Suarez, Max; Adamec, David; Koster, Randal; Schubert, Siegfried; Hansen, James; Koblinsky, Chester (Technical Monitor)

    2001-01-01

    The goal of the project is to develop an assimilation and forecast system based on a coupled atmosphere-ocean-land-surface-sea-ice model capable of using a combination of satellite and in situ data sources to improve the prediction of ENSO and other major S-I signals and their global teleconnections. The objectives of this annual report are to: (1) demonstrate the utility of satellite data, especially surface height surface winds, air-sea fluxes and soil moisture, in a coupled model prediction system; and (2) aid in the design of the observing system for short-term climate prediction by conducting OSSE's and predictability studies.

  18. Pinon Pine Power Project. Annual report, January 1--December 31, 1996

    SciTech Connect

    1997-12-31

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.

  19. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    SciTech Connect

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. Annual Progress Report Fish Research Project Oregon : Project title, Evaluation of Habitat Improvements -- John Day River.

    SciTech Connect

    Olsen, Erik A.

    1984-01-01

    This report summarizes data collected in 1983 to evaluate habitat improvements in Deer, Camp, and Clear creeks, tributaries of the John Day River. The studies are designed to evaluate changes in abundance of spring chinook and summer steelhead due to habitat improvement projects and to contrast fishery benefits with costs of construction and maintenance of each project. Structure types being evaluated are: (1) log weirs, rock weirs, log deflectors, and in stream boulders in Deer Creek; (2) log weirs in Camp Creek; and (3) log weir-boulder combinations and introduced spawning gravel in Clear Creek. Abundance of juvenile steelhead ranged from 16% to 119% higher in the improved (treatment) area than in the unimproved (control) area of Deer Creek. However, abundance of steelhead in Camp Creek was not significantly different between treatment and control areas. Chinook and steelhead abundance in Clear Creek was 50% and 25% lower, respectively in 1983, than the mean abundance estimated in three previous years. The age structure of steelhead was similar between treatment and control areas in Deer and Clear creeks. The treatment area in Camp Creek, however, had a higher percentage of age 2 and older steelhead than the control. Steelhead redd counts in Camp Creek were 36% lower in 1983 than the previous five year average. Steelhead redd counts in Deer Creek were not made in 1983 because of high streamflows. Chinook redds counted in Clear Creek were 64% lower than the five year average. Surface area, volume, cover, and spawning gravel were the same or higher than the corresponding control in each stream except in Deer Creek where there was less available cover and spawning gravel in sections with rock weirs and in those with log deflectors, respectively. Pool:riffle ratios ranged from 57:43 in sections in upper Clear Creek with log weirs to 9:91 in sections in Deer Creek with rock weirs. Smolt production following habitat improvements is estimated for each stream

  7. Annual Incidence of Knee Symptoms and Four Knee Osteoarthritis Outcomes in the Johnston County Osteoarthritis Project

    PubMed Central

    Murphy, Louise B; Moss, Susan; Do, Barbara T; Helmick, Charles G; Schwartz, Todd A.; Barbour, Kamil E; Renner, Jordan; Kalsbeek, William; Jordan, Joanne M

    2015-01-01

    Objective To estimate annual incidence rates (IR) of knee symptoms and four knee OA outcomes (radiographic, symptomatic, severe radiographic and severe symptomatic) overall and stratified by socio-demographic characteristics and knee OA risk factors. Methods We analyzed baseline [1991–1997] and first follow-up [1999–2003] data (n=1,518) from Johnston County Osteoarthritis Project. Participants are black and white adults ≥ 45 years living in Johnston County, North Carolina, US. Knee symptoms were pain, aching, or stiffness on most days in a knee. Radiographic OA was K-L grade ≥ 2 (severe radiographic ≥3) in at least one knee. Symptomatic OA was symptoms in a radiographically affected knee; severe symptomatic OA was severe symptoms and severe radiographic OA. Results The median follow-up time was 5.5 years. Average annual IRs were: symptoms=6%, radiographic OA=3%, symptomatic OA=2%, severe radiographic OA=2%, and severe symptomatic OA=0.8%. Across outcomes, IRs were highest among those with the following baseline characteristics: age ≥ 75 years; obese; a history of knee injury; or an annual household income ≤ $15,000. Conclusion The annual onset of knee symptoms and four OA outcomes in Johnston County was high. This may preview the future of knee OA in the US and underscores the urgency of clinical and public health collaborations that reduce risk factors for, and manage the impact of, these outcomes. Inexpensive, convenient and proven strategies (e.g., physical activity, self-management education courses) complement clinical care, and can reduce pain and improve quality of life for people with arthritis. PMID:26097226

  8. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    SciTech Connect

    Contor, Craig R.; Harris, Robin; King, Marty

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  9. Overview of the GASP project; Field applications and economics

    SciTech Connect

    Sarshar, M.M.; Lovie, P.M. )

    1992-03-01

    This paper reports that the aim of the Goodfellow Assocs. subsea production (GASP) project was to develop a subsea production system for use in the development of marginal oil fields. The project was divided into three phases that culminated in testing a prototype system in a dry dock. The GASP system enables manifolding of products, separation of gas from produced liquids, and transportation of gas and liquids, and transportation of gas and liquids through separate lines. The produced liquids are pumped with a single-phase pumping system that is highly modularized for ease of installation and retrieval of key components. GASP is suitable for deepwater application and development of marginal fields far from the host platform. The economics were assessed with probabilistic methods to weigh the uncertainties. Developing marginal fields with the GASP system looks attractive, offering a development cost of $2.50 to $5.50 per barrel in many typical instances.

  10. Blast Furnace Granular Coal Injection Projection. Annual Report, Jan 1 - Dec 31, 1997

    SciTech Connect

    1998-04-01

    This 1997 annual report describes the Blast Furnace Granular Coal Injection project being implemented at the Burns Harbor Plant of Bethlehem Steel Corporation. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to use British Steel technology1*2 that uses granular coal to provide a portion of the fuel requirements of blast furnaces. The project will demonstrate/assess a broad range of technical and economic issues associated with the use of coal for injection into blast furnaces. To achieve the progmm objectives, the demonstration project is divided into the following three Phases: Phase I - Design Phase II - Construction Phase III - Operation Preliminary Design (Phase 1) began in 1991 with detailed design commencing in 1993. Construction at the Burns Harbor Plant (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.

  11. Riparian Buffer Project : Annual Report for the Period April 1, 2001 to March 31, 2002.

    SciTech Connect

    Wasco County Soil and Water Conservation District

    2002-01-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteen mile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. In the first year of implementation, 26 buffer contracts were established on 25-26 miles of stream. This nearly doubled the annual goal. Buffer widths averaged 83 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.5 years. The total value of contracts established this year is $1,491,235 compared with $64,756 in BPA contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. More than half of the contracts this year have been done in the Hood and Fifteen mile sub-basins with additional contracts in adjacent sub-basins.

  12. Blast furnace granular coal injection project. Annual report, January--December 1995

    SciTech Connect

    1995-05-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. To achieve the program objectives, the demonstration project is divided into the following three Phases: (1) Phase I - Design. (2) Phase II - Construction. (3) Phase III - Operation. Preliminary Design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.

  13. Projected increases in the annual flood pulse of the western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Veliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-04-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research due to its rich biodiversity and the significant role of rain forest in carbon cycling. Climate change has also direct hydrological impact, and there have been increasing efforts to understand such dynamics at continental and subregional scales such as the scale of the western Amazon. New projections from the Coupled Model Inter- comparison Project Phase 5 (CMIP5) ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the river. Using extremes value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 years. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100- year return floods). These findings are in agreement with previously projected increases in high extremes under the Special Report on Emissions Scenarios (SRES) climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amid a growing literature that more strongly emphasises future droughts and their impact on the viability of the rain forest system over the greater Amazonia.

  14. West Hackberry Tertiary Project. Annual report, September 3, 1997--September 2, 1998

    SciTech Connect

    Gillham, T.H.

    1997-09-10

    The following report is the Project Management Plan for the fifth year of the West Hackberry Tertiary Project. The West Hackberry Tertiary Project is one of four mid-term projects selected by the United States Department of Energy (DOE) as part of the DOE`s Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form an additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  15. Field procedures manual: Sample handling, Salton Sea Scientific Drilling Project

    SciTech Connect

    Goff, S.; Mehegan, J.; Michels, D.

    1989-02-01

    This Field Procedures Manual is the comprehensive operations guide that was used to curate samples obtained from the Salton Sea Scientific Drilling Project (SSSDP). It is being published in the form used on site by the curation team. Samples recovered from the SSSDP were curated following the Policy Guidelines established for the Department of Energy/Office of Basic Energy Sciences (DOE/OBES) Continental Scientific Drilling Program (CSDP)/Thermal Regimes effort, which recognizes the uniqueness and site-specific nature of each drilling project. The SSSDP is a rotary drilling project that has provided cuttings and spot cores as well as liquid and gas samples. This manual provides details on handling all of these sample types. 6 refs., 10 figs.

  16. Gypsy Field project in reservoir characterization. Final report

    SciTech Connect

    O`Meara, Jr., D. J.

    1997-05-01

    The overall objective of this project is to use the extensive Gypsy Field laboratory and data set as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. The Gypsy Field laboratory consists of coupled outcrop and subsurface sites which have been characterized to a degree of detail not possible in a production operation. Data from these sites entail geological descriptions, core measurements, well logs, vertical seismic surveys, a 3D seismic survey, crosswell seismic surveys, and pressure transient well tests. The overall project consists of four interdisciplinary sub-projects which are closely interlinked: modeling depositional environments; sweep efficiency; tracer testing; and integrated 3D seismic interpretation. The first of these aims at improving the ability to model complex depositional environments which trap movable oil. The second is a development geophysics project which proposes to improve the quality of reservoir geological models through better use of 3D seismic data. The third investigates the usefulness of a new numerical technique for identifying unswept oil through rapid calculation of sweep efficiency in large reservoir models. The fourth explores what can be learned from tracer tests in complex depositional environments, particularly those which are fluvial dominated.

  17. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    NASA Technical Reports Server (NTRS)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  19. 24 CFR 891.715 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... account. (a) Maximum annual commitment. The maximum annual amount that may be committed under the PAC is... maximum annual commitment exceeds the amount actually paid out under the PAC each year. HUD will make...) If the HUD-approved estimate of required annual payments under the PAC for a fiscal year exceeds...

  20. 24 CFR 891.715 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... account. (a) Maximum annual commitment. The maximum annual amount that may be committed under the PAC is... maximum annual commitment exceeds the amount actually paid out under the PAC each year. HUD will make...) If the HUD-approved estimate of required annual payments under the PAC for a fiscal year exceeds...

  1. TRAC-MIP: Tropical Rain bands with an Annual cycle and Continent - Model Intercomparison Project.

    NASA Astrophysics Data System (ADS)

    Biasutti, Michela; Voigt, Aiko; Scheff, Jack; Zeppetello, Lucas Randall

    2016-04-01

    Understanding and modeling tropical rainfall has proven to be one of the most stubborn challenges in climate science. Tropical rainfall biases such as a double inter-tropical convergence zone (ITCZ) in the East Pacific have now persisted more than two decades despite the general improvements of climate models, and projections for the ITCZ and the monsoon systems remain uncertain in magnitude and sign. Progress in these areas can be fostered by a set of idealized experiments that target the dynamics of tropical rain band, as long as these simple experiments are properly integrated within a full hierarchy of model simulations. To this aim, we have designed the "Tropical Rain belts with an Annual cycle and Continent - Model Intercomparison Project." TRAC-MIP involves five experiments using idealized aquaplanet and land setups to explore the dynamics of tropical rainfall. By using interactive sea-surface temperatures and seasonally-varying insolation TRAC-MIP fills the gap between idealized aquaplanet simulations with prescribed SSTs and the fully-coupled realistic model simulations of CMIP5. TRAC-MIP includes the participation of 13 state-of-the art comprehensive climate models, and it also includes a simplified model that neglects cloud and water-vapor radiative feedbacks, thus allowing a more direct connection between the results from the TRAC-MIP comprehensive models and the theoretical studies of tropical rain belt dynamics. We will present preliminary results from the ensemble, aiming to examine the mechanisms controlling tropical precipitation in the context of forced variability. First and foremost, we are interested in the largest forced variation: the annual cycle. Second, we are interested in the response to key forcings of the future (greenhouse gases) and of the Holocene (insolation). We will draw out the similarities and the distinctions between oceanic and continental rain bands, study the ways in which the two interact with each other, and investigate

  2. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.11 What are the general requirements for a Field-Initiated Project? A Field-Initiated Project must— (a) Further... Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of...

  3. ENCOAL mild coal gasification demonstration project. Annual report, October 1994--September 1995

    SciTech Connect

    1996-01-01

    This document is the combination of the fourth quarter report (July - September 1995) and the 1995 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basis coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The products, as alternative fuels sources, are expected to significantly lower current sulfur emissions at industrial and utility boiler sites throughout the nation, thereby reducing pollutants causing acid rain. In the LFC technology, coal is first deeply dried to remove water physically. The temperature is further raised in a second stage which results in decomposition reactions that form the new products. This chemical decomposition (mild gasification) creates gases by cracking reactions from the feed coal. The chemically altered solids are cooled and further processed to make PDF. The gases are cooled, condensing liquids as CDL, and the residual gases are burned in the process for heat. The process release for the ENCOAL plant predicted that one ton of feed coal would yield roughly {1/2} ton of PDF and {1/2} barrel of CDL. By varying plant running conditions, however, it has since been learned that the actual CDL recovery rate may be as much as 15% to 20% above the projections.

  4. Blast furnace granular coal injection project. Annual report, January--December 1994

    SciTech Connect

    1995-07-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the US Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I -- design; Phase II -- construction; and Phase III -- operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. A 100% construction review meeting was held in December and attended by representatives of DOE, Fluor Daniel and Bethlehem Steel. The coal preparation mills were started up in December, 1994, and the first coal was injected into ``D`` blast furnace on December 19, 1994. Near the end of the year, the grinding mills and injection facility were being prepared for performance testing during the first quarter of 1995. The demonstration test program (phase III) will start in the fourth quarter of 1995.

  5. Bodcau in situ combustion project. Fourth annual report, September 1, 1979-February 28, 1981

    SciTech Connect

    Hardin, G.

    1981-07-01

    Objective is to demonstrate the technical efficiency and economics of a commercial scale in-situ combustion project in a shallow heavy oil reservoir. Five elongated inverted nine-spot patterns were developed for this demonstration on Cities Service Company's Bodcau Fee B lease in the Bellevue Field, Bossier Parish, Louisiana. The five patterns comprising the demonstration project enclose 19 productive acres and consist of thirty-eight producing, five injection and five observation wells. This report briefly reviews the history of the project with emphasis on operations from September 1979 through February 1981. Sections on the air system explosion in February 1980 and the results from an evaluation well drilling program in pattern 15 are highlights.

  6. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    SciTech Connect

    Green, Gerald I.; Coeur D'Alene Tribe.

    2002-06-01

    activities are conducted in the headwaters of the system and are expected to prove beneficial to the natural functions of the entire Hangman Watershed. The following is the FY2001 annual report of Project activities and is submitted as partial fulfillment of Operation and Maintenance Task 2.a. The Objectives and Tasks for this first year were designed to position this Project for a long-term habitat restoration effort. As such, efforts were largely directed at information gathering and project orientation. The major task for this first year was development of a Habitat Prioritization Plan (attached) to guide implementation efforts by selecting areas that will be of greatest benefit to the native ecology. Completion of the first year tasks has positioned the project to move forward with implementing restoration activities using the latest information to accomplish the greatest possible results. The Project will be looking to implement on-the-ground protection and restoration efforts in the coming fiscal year using the data and information gathered in the last fiscal year. Continually refining our understanding of the natural watershed functions and fish and wildlife habitats within the Project Area will result in an increase in the efficiency of project implementation. Research and data gathering efforts will remain a strong emphasis in the coming fiscal year, as it will throughout the life of this Project.

  7. West Hackberry tertiary project. Annual report, September 3, 1994--September 2, 1995

    SciTech Connect

    Gillham, T.; Cerveny, B.; Turek, E.

    1996-05-01

    The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form and additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  8. Microspacecraft and Earth observation: Electrical field (ELF) measurement project

    NASA Technical Reports Server (NTRS)

    Olsen, Tanya; Elkington, Scot; Parker, Scott; Smith, Grover; Shumway, Andrew; Christensen, Craig; Parsa, Mehrdad; Larsen, Layne; Martinez, Ranae; Powell, George

    1990-01-01

    The Utah State University space system design project for 1989 to 1990 focuses on the design of a global electrical field sensing system to be deployed in a constellation of microspacecraft. The design includes the selection of the sensor and the design of the spacecraft, the sensor support subsystems, the launch vehicle interface structure, on board data storage and communications subsystems, and associated ground receiving stations. Optimization of satellite orbits and spacecraft attitude are critical to the overall mapping of the electrical field and, thus, are also included in the project. The spacecraft design incorporates a deployable sensor array (5 m booms) into a spinning oblate platform. Data is taken every 0.1 seconds by the electrical field sensors and stored on-board. An omni-directional antenna communicates with a ground station twice per day to down link the stored data. Wrap-around solar cells cover the exterior of the spacecraft to generate power. Nine Pegasus launches may be used to deploy fifty such satellites to orbits with inclinations greater than 45 deg. Piggyback deployment from other launch vehicles such as the DELTA 2 is also examined.

  9. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    SciTech Connect

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease in annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.

  10. Studies in Teaching 1999 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 1999).

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    This publication presents a collection of research projects presented at the Annual Research Forum at Wake Forest University: "The Use of Group Work as an Effective Teaching Technique in Lower Level Spanish Classes" (James Blackburn); "What Are the Real Factors behind Student Motivation?" (Matthew Grey Burdick); "Can Students Communicate…

  11. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    DOE PAGESBeta

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less

  12. Developments in Lunar Gravity Field Recovery Within the Project GRAZIL

    NASA Astrophysics Data System (ADS)

    Wirnsberger, Harald; Klinger, Beate; Krauss, Sandro; Mayer-Gürr, Torsten

    2016-10-01

    The project GRAZIL addresses the highly accurate recovery of the lunar gravity field using intersatellite Ka-band ranging (KBR) measurements collected by the Lunar Gravity Ranging System (LGRS) of the Gravity Recovery And Interior Laboratory (GRAIL) mission. Dynamic precise orbit determination is an indispensable task in order to recover the lunar gravity field based on LGRS measurements. The concept of variational equations is adopted to determine the orbit of the two GRAIL satellites based on radio science data. In this contribution we focus on the S-band two-way Doppler data collected by the Deep Space Network.As far as lunar gravity field recovery is concerned, we apply an integral equation approach using short orbital arcs. In this contribution we demonstrate the progress of Graz lunar gravity field models (GrazLGM) from the beginning, till the end of the projet GRAZIL. For the latest GrazLGM version special attention is given to the refinement of our processing strategy in conjunction with an increase of the spectral resolution. Furthermore, we present the first GrazLGM based on KBR observations during the primary and the extended mission phase. Our results are validated against state of the art lunar gravity field models computed at NASA-GSFC and NASA-JPL.

  13. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    SciTech Connect

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  14. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    SciTech Connect

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  15. Impact of annual dosing with ivermectin on progression of onchocercal visual field loss.

    PubMed Central

    Cousens, S. N.; Cassels-Brown, A.; Murdoch, I.; Babalola, O. E.; Jatau, D.; Alexander, N. D.; Evans, J. E.; Danboyi, P.; Abiose, A.; Jones, B. R.

    1997-01-01

    Reported are the results of a randomized, double-masked, placebo-controlled trial of annual ivermectin dosing in 34 rural communities, Kaduna State, northern Nigeria, where guinea savanna onchocerciasis is mesoendemic. A total of 939 individuals underwent Friedmann field analysis at the first examination and saw at least 19 spots in at least one eye. Of these, 636 (68%) completed a subsequent Friedmann field analysis 2-3 years later. The adjusted incidence rate ratio for the ivermectin group versus the placebo group was 0.64 (95% confidence interval (CI): 0.42-0.98). There was some evidence that the impact of ivermectin was greatest among those who had received one dose of ivermectin. The majority of the deteriorations occurred in eyes that gave evidence of optic atrophy at the first examination. An analysis restricted to individuals with optic atrophy at baseline indicated a reduction of 45% in the incidence of visual field deterioration in the ivermectin group (95% CI: 8-67%). Previous findings have shown that ivermectin has an impact on the incidence of optic atrophy. Our results indicate, for the first time, that ivermectin has a substantial impact on the progression of visual field loss among those with pre-existing optic atrophy. PMID:9277010

  16. 76 FR 12717 - Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI) Projects; Office of Special Education and Rehabilitative Services; Overview Information; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers...

  17. Energy consumption and expenditure projections by income quintile on the basis of the Annual Energy Outlook 1997 forecast

    SciTech Connect

    Poyer, D.A.; Allison, T.

    1998-03-01

    This report presents an analysis of the relative impacts of the base-case scenario used in the Annual Energy Outlook 1997, published by the US Department of Energy, Energy Information Administration, on income quintile groups. Projected energy consumption and expenditures, and projected energy expenditures as a share of income, for the period 1993 to 2015 are reported. Projected consumption of electricity, natural gas, distillate fuel, and liquefied petroleum gas over this period is also reported for each income group. 33 figs., 11 tabs.

  18. Recovering the tidal field in the projected galaxy distribution

    NASA Astrophysics Data System (ADS)

    Alonso, David; Hadzhiyska, Boryana; Strauss, Michael A.

    2016-07-01

    We present a method to recover and study the projected gravitational tidal forces from a galaxy survey containing little or no redshift information. The method and the physical interpretation of the recovered tidal maps as a tracer of the cosmic web are described in detail. We first apply the method to a simulated galaxy survey and study the accuracy with which the cosmic web can be recovered in the presence of different observational effects, showing that the projected tidal field can be estimated with reasonable precision over large regions of the sky. We then apply our method to the Two Micron All-Sky survey and present a publicly available full-sky map of the projected tidal forces in the local Universe. As an example of an application of these data, we further study the distribution of galaxy luminosities across the different elements of the cosmic web, finding that, while more luminous objects are found preferentially in the most dense environments, there is no further segregation by tidal environment.

  19. Data management for interdisciplinary field experiments: OTTER project support

    NASA Technical Reports Server (NTRS)

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  20. West Hackberry Tertiary Project. Annual report, September 3, 1995--September 2, 1996

    SciTech Connect

    Gillham, T.; Cerveny, B.; Turek, E.

    1997-05-01

    The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. In previous field tests, the Double Displacement Process has proven successful in generating tertiary oil recovery. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery from the combustion process. If successful, this project will demonstrate that utilizing air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs (such as Gulf Coast salt dome reservoirs) where any other tertiary process is presently uneconomic.

  1. 200 Steamflood Demonstration Project. Fourth annual report, June 1979-June 1980

    SciTech Connect

    Alford, W O

    1981-02-01

    The 200 Sand Steamflood Demonstration Project is testing an enhanced steamflooding technique in the Midway-Sunset Field, Kern County, California. This project was initiated to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic steam stimulation. A pilot test was conducted in four (4) 2.35 acre inverted seven-spot steam drive patterns, which were not fully developed with producers. As a result of the response shown by the pilot, in April 1980, work began to expand the pilot area to a total of fourteen (14) fully developed 2.35 acre inverted seven-spot patterns. Expansion to a full-scale steamflood test will consist of drilling and completing 30 producing wells and 10 steam injection wells. The reservoir contains approximately 50 million barrels of oil-in-place in a structure that lies between 400 and 700 feet in depth.

  2. Annual Review 1994.

    ERIC Educational Resources Information Center

    Bernard Van Leer Foundation, The Hague (Netherlands).

    The report provides an annual report and financial review for 1994 of the Bernard van Leer Foundation, a private institution that was created for broad humanitarian purposes in 1949, and shows the varied aspects of the foundation's activities in the project field. In addition, it includes a number of feature articles which highlight specific…

  3. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    SciTech Connect

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  4. Project 57 Air Monitoring Annual Report - Fiscal Year 2013 (October 1, 2012 to September 30, 2013)

    SciTech Connect

    Miller, Julianne J.; McCurdy, Greg; Mizell, Steve A

    2014-07-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) is currently working to achieve regulatory closure of radionuclide-contaminated Soils sites under its auspices. Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site is located in Emigrant Valley, Nevada, on Range 4808A of the Nevada Test and Training Range (NTTR), and consists of one Corrective Action Site (CAS): NAFR-23-02, Pu Contaminated Soil. Closure plans being developed for the CAUs both on and off of the Nevada National Security Site (NNSS) may include postclosure monitoring for the possible release of radioactive contaminants. Determining the potential for transport of radionuclide-contaminated soils under ambient climatic conditions will facilitate an appropriate closure design and postclosure monitoring program. The DOE has authorized the Desert Research Institute (DRI) to conduct field assessments of potential transport of radionuclide-contaminated soil from the Project 57 site during ambient wind events. The assessment is intended to provide site-specific information on meteorological conditions that result in airborne soil particle redistribution, as well as determine which, if any, radiological contaminants may be entrained with the soil particles and estimate their concentrations.

  5. Geophysical monitoring of a field-scale biostimulation pilot project.

    PubMed

    Lane, John W; Day-Lewis, Frederick D; Casey, Clifton C

    2006-01-01

    The USGS conducted a geophysical investigation in support of a U.S. Naval Facilities Engineering Command, Southern Division field-scale biostimulation pilot project at Anoka County Riverfront Park (ACP), down-gradient of the Naval Industrial Reserve Ordnance Plant, Fridley, Minnesota. The goal of the pilot project is to evaluate subsurface injection of vegetable oil emulsion (VOE) to stimulate microbial degradation of chlorinated hydrocarbons. To monitor the emplacement and movement of the VOE and changes in water chemistry resulting from VOE dissolution and/or enhanced biological activity, the USGS acquired cross-hole radar zero-offset profiles, travel-time tomograms, and borehole geophysical logs during five site visits over 1.5 years. Analysis of pre- and postinjection data sets using petrophysical models developed to estimate VOE saturation and changes in total dissolved solids provides insights into the spatial and temporal distribution of VOE and ground water with altered chemistry. Radar slowness-difference tomograms and zero-offset slowness profiles indicate that the VOE remained close to the injection wells, whereas radar attenuation profiles and electromagnetic induction logs indicate that bulk electrical conductivity increased down-gradient of the injection zone, diagnostic of changing water chemistry. Geophysical logs indicate that some screened intervals were located above or below zones of elevated dissolved solids; hence, the geophysical data provide a broader context for interpretation of water samples and evaluation of the biostimulation effort. Our results include (1) demonstration of field and data analysis methods for geophysical monitoring of VOE biostimulation and (2) site-specific insights into the spatial and temporal distributions of VOE at the ACP.

  6. Geophysical monitoring of a field-scale biostimulation pilot project

    USGS Publications Warehouse

    Lane, J.W.; Day-Lewis, F. D.; Casey, C.C.

    2006-01-01

    The USGS conducted a geophysical investigation in support of a U.S. Naval Facilities Engineering Command, Southern Division field-scale biostimulation pilot project at Anoka County Riverfront Park (ACP), downgradient of the Naval Industrial Reserve Ordnance Plant, Fridley, Minnesota. The goal of the pilot project is to evaluate subsurface injection of vegetable oil emulsion (VOE) to stimulate microbial degradation of chlorinated hydrocarbons. To monitor the emplacement and movement of the VOE and changes in water chemistry resulting from VOE dissolution and/or enhanced biological activity, the USGS acquired cross-hole radar zero-offset profiles, traveltime tomograms, and borehole geophysical logs during five site visits over 1.5 years. Analysis of pre- and postinjection data sets using petrophysical models developed to estimate VOE saturation and changes in total dissolved solids provides insights into the spatial and temporal distribution of VOE and ground water with altered chemistry. Radar slowness-difference tomograms and zero-offset slowness profiles indicate that the VOE remained close to the injection wells, whereas radar attenuation profiles and electromagnetic induction logs indicate that bulk electrical conductivity increased downgradient of the injection zone, diagnostic of changing water chemistry. Geophysical logs indicate that some screened intervals were located above or below zones of elevated dissolved solids; hence, the geophysical data provide a broader context for interpretation of water samples and evaluation of the biostimulation effort. Our results include (1) demonstration of field and data analysis methods for geophysical monitoring of VOE biostimulation and (2) site-specific insights into the spatial and temporal distributions of VOE at the ACP. ?? 2006 National Ground Water Association.

  7. Rocketdyne Division annual site environmental report Santa Susana Field Laboratory and Desoto sites 1995

    SciTech Connect

    1996-07-30

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation (Rocketdyne). These are identified as the Santa Susana Field Laboratory (SSFL) and the DeSoto site. The sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The DeSoto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warrants comprehensive monitoring to assure protection of the environment. SSFL consists of four administrative areas used for research, development, and test operations as well as a buffer zone. A portion of Area I and all of Area II are owned by the U.S. Government and assigned to the National Aeronautics and Space Administration (NASA). A portion of Area IV is under option for purchase by the Department of Energy (DOE).

  8. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Sites, 1992

    SciTech Connect

    none,

    1993-12-14

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling environmental remediation, i.e., the U.S. DOE, the Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS) Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonradiological monitoring at SSFL.

  9. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Sites, 1993

    SciTech Connect

    None, None

    1994-10-21

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling environmental remediation, i.e., the U.S. DOE, the Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS) Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonoradiological monitoring at SSFL.

  10. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Sites, 1994

    SciTech Connect

    none,

    1995-09-30

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation (Rocketdyne). These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies. i.e., the U.S. DOE, the Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS) Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL. which is the only area where DOE activities have been performed. While the major focus of attention is radiological, this report also includes a discussion of nonradiological monitoring at SSFL.

  11. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Site, 1991

    SciTech Connect

    none,

    1992-12-03

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling operations with nuclear fuel or nuclear reactors. i.e., the U.S. DOE and the California State Department of Health Services (DHS). Radiologic Health Branch (RHB). For that reason. information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonradiological monitoring at SSFL.

  12. Rocketdyne division environmental monitoring annual report, Santa Susana Field Laboratory, De Soto, and Canoga Sites, 1990

    SciTech Connect

    none,

    1991-06-20

    This annual report discuses environmental monitoring at three manufacturing and test operations sites operated in the Southern California area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL.), the De Soto site, and the Canoga site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto and Canoga sites are essentially light industry with some laboratory-scale R&D and have little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling operations with nuclear and radioactive materials, i.e., the U.S. DOE, the U.S. Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS), Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major realm of interest is radiological, this report also includes some discussion of nonradiological monitoring at SSFL

  13. Annual and semiannual variations of the geomagnetic field at equatorial locations

    USGS Publications Warehouse

    Campbell, W.H.

    1981-01-01

    For a year of quiet solar-activity level, geomagnetic records from American hemisphere observatories located between about 0?? and 30?? north geomagnetic latitude were used to compare the annual and semiannual variations of the geomagnetic field associated with three separate contributions: (a) the quiet-day midnight level, MDT; (b) the solar-quiet daily variation, Sq; (c) the quiet-time lunar semidiurnal tidal variation, L(12). Four Fourier spectral constituents (24, 12, 8, 6 h periods) of Sq were individually treated. All three orthogonal elements (H, D and Z) were included in the study. The MDT changes show a dominant semiannual variation having a range of about 7 gammas in H and a dominant annual variation in Z having a range of over 8 gammas. These changes seem to be a seasonal response to the nightside distortions by magnetospheric currents. There is a slow decrease in MDT amplitudes with increasing latitude. The Sq changes follow the patterns expected from an equatorial ionospheric dynamo electrojet current system. The dominant seasonal variations occur in H having a range of over 21 gammas for the 24 h period and over 12 gammas for the 12 h period spectral components. The higher-order components are relatively smaller in size. The Sq(H) amplitudes decrease rapidly with increasing latitude. Magnetospheric contributions to the equatorial Sq must be less than a few per cent of the observed magnitude. The L(12) variation shows the ionospheric electrojet features by the dominance of H and the rapid decrease in amplitude with latitude away from the equator. However, the seasonal variation range of over 7 gammas has a maximum in early February and minimum in late June that is not presently explainable by the known ionospheric conductivity and tidal behavior. ?? 1981.

  14. The Annual Cosmic-Radiation Intensities 1391 - 2014; The Annual Heliospheric Magnetic Field Strengths 1391 - 1983, and Identification of Solar Cosmic-Ray Events in the Cosmogenic Record 1800 - 1983

    NASA Astrophysics Data System (ADS)

    McCracken, K. G.; Beer, J.

    2015-10-01

    The annual cosmogenic ^{10}Be ice-core data from Dye 3 and the North Greenland Ice-core Project (NGRIP), and neutron-monitor data, 1951 - 2014, are combined to yield a record of the annual cosmic-ray intensity, 1391 - 2014. These data were then used to estimate the intensity of the heliospheric magnetic field (HMF), 1391 - 1983. All of these annual data are provided in the Electronic Supplementary Material. Analysis of these annual data shows that there were significant impulsive increases in ^{10}Be production in the year following the very large solar cosmic-ray events of 1942, 1949, and 1956. There was an additional enhancement that we attribute to six high-altitude nuclear explosions in 1962. All of these enhancements result in underestimates of the strength of the HMF. An identification process is defined, resulting in a total of seven impulsive ^{10}Be events in the interval 1800 - 1942 prior to the first detection of a solar cosmic-ray event using ionization chambers. Excision of the ^{10}Be impulsive enhancements yields a new estimate of the HMF, designated B(PCR-2). Five of the seven ^{10}Be enhancements prior to 1941 are well correlated with the occurrence of very great geomagnetic storms. It is shown that a solar cosmic-ray event similar to that of 25 July 1946, and occurring in the middle of the second or third year of the solar cycle, may merge with the initial decreasing phase of the 11-year cycle in cosmic-ray intensity and be unlikely to be detected in the ^{10}Be data. It is concluded that the occurrence rate for solar energetic-particle (SEP) events such as that on 23 February 1956 is about seven per century, and that there is an upper limit to the size of solar cosmic-ray events.

  15. John Day Basin Spring Chinook Salmon Escapement and Productivity Monitoring; Fish Research Project Oregon, 1998-1999 Annual Report.

    SciTech Connect

    Jonasson, Brian C.; Albaladejo, Victor D.; Carmichael, Richard W.

    1999-12-01

    The John Day River basin supports one of the healthiest naturally-produced populations of spring chinook in the mid-Columbia River basin. The study of life history and natural escapement conducted from 1978 to 1985 (Lindsay et al. 1986) provided valuable information on production and productivity of the John Day River spring chinook. With the exception of two years since completion of the study in 1985 (1989 and 1995), spring chinook spawning surveys were conducted in index areas only and have not provided adequate information to assess age composition, progeny-to-parent production values, and estimate natural spawning escapement. The PATH project (Marmorek and Peters 1996) has identified the John Day basin spring chinook as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin. To meet the data needs as an index stock, sufficient annual estimates of spawner escapement, age composition, and smolt-to-adult survival are essential. There is need to determine the annual spawner escapement and age composition for the John Day basin spring chinook to provide us the ability to estimate progeny-to-parent production for each brood year. This need can be met by expanding the annual chinook spawning surveys, estimating the annual escapement, and determining age composition by scale pattern analyses. This project provides information as directed under two measures of the Columbia Basin Fish and Wildlife Program (NPPC 1994). Measure 4.3C specifies that the key indicator populations should be monitored to provide detailed stock status information. In addition, measure 7.1C identifies the need for collection of population status, life history, and other data on wild and naturally spawning populations. This project was developed in direct response to recommendations and needs of the PATH project, the Fish and Wildlife Program, and the Columbia Basin Fish and Wildlife Authority Multi-Year Implementation Plan.

  16. Advanced technology ladle preheater research, development, field test and commercialization program. Annual report

    SciTech Connect

    Smith, D.B.; Nelson, J.; Battles, D.D.

    1981-01-01

    The objective of this project is to develop a cost effective, reliable heating system that will improve gas utilization efficiencies. The Phase I prototype THERMECON (tm) Ladle Heater System was successfully designed, fabricated, and field tested during the year. Extensive baseline performance testing of the prototype THERMECON system versus a conventional horizontally positioned ladle heater system was completed. The prototype THERMECON system heated the ladle faster, hotter, and with less energy than the conventional heaters, in addition to other improved performance factors. The temperature uniformity of the refractory surface heated by the THERMECON system was much improved over typical conventional systems.

  17. Model parameter uncertainty analysis for an annual field-scale P loss model

    NASA Astrophysics Data System (ADS)

    Bolster, Carl H.; Vadas, Peter A.; Boykin, Debbie

    2016-08-01

    Phosphorous (P) fate and transport models are important tools for developing and evaluating conservation practices aimed at reducing P losses from agricultural fields. Because all models are simplifications of complex systems, there will exist an inherent amount of uncertainty associated with their predictions. It is therefore important that efforts be directed at identifying, quantifying, and communicating the different sources of model uncertainties. In this study, we conducted an uncertainty analysis with the Annual P Loss Estimator (APLE) model. Our analysis included calculating parameter uncertainties and confidence and prediction intervals for five internal regression equations in APLE. We also estimated uncertainties of the model input variables based on values reported in the literature. We then predicted P loss for a suite of fields under different management and climatic conditions while accounting for uncertainties in the model parameters and inputs and compared the relative contributions of these two sources of uncertainty to the overall uncertainty associated with predictions of P loss. Both the overall magnitude of the prediction uncertainties and the relative contributions of the two sources of uncertainty varied depending on management practices and field characteristics. This was due to differences in the number of model input variables and the uncertainties in the regression equations associated with each P loss pathway. Inspection of the uncertainties in the five regression equations brought attention to a previously unrecognized limitation with the equation used to partition surface-applied fertilizer P between leaching and runoff losses. As a result, an alternate equation was identified that provided similar predictions with much less uncertainty. Our results demonstrate how a thorough uncertainty and model residual analysis can be used to identify limitations with a model. Such insight can then be used to guide future data collection and model

  18. Electric and Magnetic Fields Research and Public Information Dissemination Program annual report for fiscal year 1996

    SciTech Connect

    1997-06-01

    The Electric and Magnetic Fields (EMF) Research and Public Information Dissemination (RAPID) Program was authorized by the Energy Policy Act of 1992 as a near-term effort to expand and accelerate the research needed to address the EMF issue. As required by this legislation, the EMF Interagency Committee, the National EMF Advisory Committee (NEMFAC), and the National Academy of Sciences (NAS) are providing valued input and advice for the direction of this program. With this input and advice, the Department of Energy (DOE) and the National Institute of Environmental Health Sciences (NIEHS) have developed and are implementing five-year program plans. Multi-year health effects research projects and related EMF measurement and exposure assessment projects are underway using funds appropriated in fiscal years 1994, 1995, and 1996 together with voluntary non-Federal contributions. The results of these research projects, along with the results of other EMF research, will be used as input to the hazard evaluation effort, which is the focus of the EMF RAPID Program. A coordinated interagency program is underway to communicate needed information on the EMF issue in a clear manner to the public and other decision makers.

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    SciTech Connect

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    indicators for detecting a signal in the estuarine system resulting from the multiple projects were also reviewed, i.e. organic matter production, nutrient cycling, sedimentation, food webs, biodiversity, salmon habitat usage, habitat opportunity, and allometry. In subsequent work, this information will be used to calculate the over net effect on the ecosystem. To evaluate the effectiveness of habitat restoration actions in the lower Columbia River and estuary, a priority of this study has been to develop a set of minimum ecosystem monitoring protocols based on metrics important for the CRE. The metrics include a suite of physical measurements designed to evaluate changes in hydrological and topographic features, as well as biological metrics that will quantify vegetation and fish community structure. These basic measurements, intended to be conducted at all restoration sites in the CRE, will be used to (1) evaluate the effectiveness of various restoration procedures on target metrics, and (2) provide the data to determine the cumulative effects of many restoration projects on the overall system. A protocol manual is being developed for managers, professional researchers, and informed volunteers, and is intended to be a practical technical guide for the design and implementation of monitoring for the effects of restoration activities. The guidelines are intended to standardize the collection of data critical for analyzing the anticipated ecological change resulting from restoration treatments. Field studies in 2005 are planned to initiate the testing and evaluation of these monitoring metrics and protocols and initiate the evaluation of higher order metrics for cumulative effects.

  20. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  1. Iron Metabolism in Field Hockey Players During an Annual Training Cycle

    PubMed Central

    Podgórski, Tomasz; Kryściak, Jakub; Konarski, Jan; Domaszewska, Katarzyna; Durkalec-Michalski, Krzysztof; Strzelczyk, Ryszard; Pawlak, Maciej

    2015-01-01

    Post-physical training changes in iron metabolism in the human body often occur. To fully describe these processes, fifteen male Polish National Team field hockey players (age 27.7 ± 5.2 years, body mass 72.8 ± 7.6 kg and body height 177.1 ± 5.7 cm) were examined in three phases of an annual training cycle: preparatory (T1), competitive (T2) and transition (T3). To assess aerobic fitness, maximal oxygen uptake (VO2max) was evaluated. Based on the iron concentration, the changes in total iron binding capacity (TIBC), unsaturated iron binding capacity (UIBC) and other selected haematological indicators (haemoglobin, erythrocytes, mean corpuscular haemoglobin - MCH) in iron metabolism were estimated. The average values of maximum oxygen uptake increased from 54.97 ± 3.62 ml·kg−1·min−1 in T1 to 59.93 ± 3.55 ml·kg−1·min−1 in T2 (p<0.05) and then decreased to 56.21 ± 4.56 ml·kg−1·min−1 in T3 (p<0.05). No statistically significant changes in the erythrocyte count were noted. The MCH and haemoglobin concentration decreased between T1 and T2. The maximal exercise test caused a significant (p<0.05) increase in the plasma iron concentration during the competition and transition phases. Progressive but non-significant increases in resting iron concentration, TIBC and UIBC in the analysed annual training cycle were noted. To show global changes in iron metabolism in the human body, it is necessary to determine additional variables, i.e. UIBC, TIBC, haemoglobin, MCH or the erythrocyte count. The direction of changes in iron metabolism depends on both the duration and intensity of the physical activity and the fitness level of the subjects. Dietary intake of iron increases the level of this trace element and prevents anaemia associated with training overloads. PMID:26557195

  2. Oil, gas field growth projections: Wishful thinking or reality?

    USGS Publications Warehouse

    Attanasi, E.D.; Mast, R.F.; Root, D.H.

    1999-01-01

    The observed `field growth' for the period from 1992 through 1996 with the US Geological Survey's (USGS) predicted field growth for the same period are compared. Known field recovery of field size is defined as the sum of past cumulative field production and the field's proved reserves. Proved reserves are estimated quantities of hydrocarbons which geologic and engineering data demonstrate with reasonable certainty to recoverable from known fields under existing economic and operating conditions. Proved reserve estimates calculated with this definition are typically conservative. The modeling approach used by the USGS to characterize `field growth phenomena' is statistical rather that geologic in nature.

  3. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    SciTech Connect

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008

  4. Investigation of precipitation characteristics during NASA GV field projects

    NASA Astrophysics Data System (ADS)

    Dolan, B.; Rutledge, S. A.; Petersen, W. A.; Wolff, D. B.

    2014-12-01

    The availability of high quality rain gage networks for extended periods of time during NASA ground validation (GV) field projects supporting the Global Precipitation Measurement Mission (GPM) allow for extensive analysis of precipitation characteristics over a variety of locations and meteorological regimes. Changes in drop size distribution (DSD) parameters (e.g. D0, Nw, LWC) over the course of a six week deployment are shown for the MC3E, IFloodS, and IPHEx experiments. During MC3E, median drop diameters (D0) progressively increased from late April through mid-May, coupled with a decrease in the normalized gamma number concentration (Nw). The environmental characteristics, such as CAPE, shear and moisture, that are most correlated with this change in DSD are investigated. It is hypothesized that increasing storm strength leads to larger precipitation particles that consume the available water at the expense of smaller particles, leading to increased D0 and lower Nw. In stratiform regions, stronger storms could lead to enhanced convergence and strong mesoscale ascent, resulting in the growth of larger ice particles and aggregates, also increasing D0 and lowering Nw. Changes in DSD are also examined from the perspective of polarimetric radar. The NASA S-band NPOL research radar is used to analyze changes in the DSD using the so-called self-consistency relationship between the ratio of specific differential phase (Kdp) to linear horizontal reflectivity (Zh) as a function of differential reflectivity (Zdr). The ability to detect changes in drop size distribution parameters from a high spatial and temporal resolution platform such as a radar would be useful for rainfall estimation. Changes in the self-consistency relationship during MC3E indicate an increase in Zdr from late April to mid-May, associated with a decrease in the ratio of Kdp/Zh. The polarimetric data from NPOL are also used to infer bulk microphysics in the column leading to changes in the drop size

  5. Technology base research project for electrochemical energy storage: Annual report for 1987

    SciTech Connect

    Kinoshita, Kim

    1988-07-01

    This report summarizes the progress made by the Technology Base Research (TBR) Project for Electrochemical Energy Storage during calendar year 1987. The primary objective of the TBR Project, which is sponsored by the Department of Energy (DOE) and managed by Lawrence Berkeley Laboratory (LBL), is to identify electrochemical technologies that can satisfy stringent performance and economic requirements for electric vehicles and stationary energy storage applications. The ultimate goal is to transfer the most promising electrochemical technologies to the private sector or to another DOE project (e.g., Sandia National Laboratories' Exploratory Technology Development and Testing Project) for further development and scale-up. Besides LBL, which has overall responsibility for the TBR Project, Los Alamos National Laboratory (LANL), Brookhaven National Laboratory (BNL) and Argonne National Laboratory (ANL) participate in the TBR Project by providing key research support in several of the project elements. The TBR Project consists of three major project elements: exploratory research; applied science research and; air systems research. The objectives and the specific battery and electrochemical systems addressed by each project element are discussed in the following sections, which also include technical summaries that relate to the individual projects. Financial information that relates to the various projects and a description of the management activities for the TBR Project are described in the Executive Summary. 19 figs., 1 tab.

  6. Using Field-Metered Data to Quantify Annual Energy Use of Portable Air Conditioners

    SciTech Connect

    Burke, Thomas; Willem, Henry; Ni, Chun Chun; Stratton, Hannah; Chen, Yuting; Ganeshalingam, Mohan; Iyer, Maithili; Price, Sarah; Dunham, Camilla

    2014-12-01

    As many regions of the United States experience rising temperatures, consumers have come to rely increasingly on cooling appliances (including portable air conditioners) to provide a comfortable indoor temperature. Home occupants sometimes use a portable air conditioner (PAC) to maintain a desired indoor temperature in a single room or enclosed space. Although PACs in residential use are few compared to centrally installed and room air conditioning (AC) units, the past few years have witnessed an increase of PACs use throughout the United States. There is, however, little information and few research projects focused on the energy consumption and performance of PACs, particularly studies that collect information from field applications of PACs. The operation and energy consumption of PACs may differ among geographic locations and households, because of variations in cooling load, frequency, duration of use, and other user-selected settings. In addition, the performance of building envelope (thermal mass and air leakage) as well as inter-zonal mixing within the building would substantially influence the ability to control and maintain desirable indoor thermal conditions. Lawrence Berkeley National Laboratory (LBNL) conducted an initial field-metering study aimed at increasing the knowledge and data related to PAC operation and energy consumption in the United States.

  7. Relevant Experiences for Alternative Learning Project. Year 1. Third-Party Annual Evaluation Report.

    ERIC Educational Resources Information Center

    Wasdyke, Raymond G.

    This report of the first-year operations of project REAL (Relevant Experiences for Alternative Learning), an experience based career education (EBCE) project based on the EBCE model developed by Northwest Regional Educational Laboratories, is presented in four parts. (The three broad characteristics of Project REAL follow: student-centered and…

  8. Enrollment Projections: Combining Statistics and Gut Feelings. AIR 1993 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Weissman, Julie; Stroupe, Jane

    Personnel at the College of Lake County (CLC) developed a projections model for student enrollment that satisfies the need for information for budget projections and for planning purposes. CLC is a medium-sized suburban community college located north of Chicago. The Enrollment Management Team was asked to create a process to project enrollments…

  9. Tucannon Model Watershed 1997 Habitat Projects : Annual Progress Report Project Period: January 1, 1997 to March 31, 1998.

    SciTech Connect

    Bruegman, Terry; Nordheim, Debby

    1998-10-28

    The Tucannon Model Watershed 1997 habitat projects were designed to address critical limiting factors identified through the watershed assessment and Plan development. Construction elements were composed of bioengineering techniques designed to increase salmonid habitat complexity, insure stream bank and geomorphic stability, and reduce stream temperature and sediments in spawning gravels. Cooperation and agreement between landowners and resource agencies for restoring resource conditions has grown due to project success and is expected to continue for the benefit of all.

  10. A Harriet Tubman Celebration: Here's How We Do This Annual Mixed-Age Project.

    ERIC Educational Resources Information Center

    Mensher, Gail B.

    1994-01-01

    Describes one school's annual celebration of Harriet Tubman, 19th-century African-American heroine of the Underground Railroad. Children ages 4-11 engage in multisensory and cognitive learning activities designed to help them understand the rich traditions of early African Americans and the abolitionist movement to end slavery. Activities…

  11. Health Education Field Experience Stories: A Reflective, Digital, Performance-Based Project

    ERIC Educational Resources Information Center

    Lyde, Adrian R.

    2012-01-01

    This article describes a reflective, systematic, performance-based project resulting in the development of a digital story about a community health education field experience. The project is designed for preservice health education students at the college/university level. The primary benefit of the project is that it challenges students to engage…

  12. Projecting pest population dynamics under global warming: the combined effect of inter- and intra-annual variations.

    PubMed

    Zidon, Royi; Tsueda, Hirotsugu; Morin, Efrat; Morin, Shai

    2016-06-01

    The typical short generation length of insects makes their population dynamics highly sensitive not only to mean annual temperatures but also to their intra-annual variations. To consider the combined effect of both thermal factors under global warming, we propose a modeling framework that links general circulation models (GCMs) with a stochastic weather generator and population dynamics models to predict species population responses to inter- and intra-annual temperature changes. This framework was utilized to explore future changes in populations of Bemisia tabaci, an invasive insect pest-species that affects multiple agricultural systems in the Mediterranean region. We considered three locations representing different pest status and climatic conditions: Montpellier (France), Seville (Spain), and Beit-Jamal (Israel). We produced ensembles of local daily temperature realizations representing current and future (mid-21st century) climatic conditions under two emission scenarios for the three locations. Our simulations predicted a significant increase in the average number of annual generations and in population size, and a significant lengthening of the growing season in all three locations. A negative effect was found only in Seville for the summer season, where future temperatures lead to a reduction in population size. High variability in population size was observed between years with similar annual mean temperatures, suggesting a strong effect of intra-annual temperature variation. Critical periods were from late spring to late summer in Montpellier and from late winter to early summer in Seville and Beit-Jamal. Although our analysis suggested that earlier seasonal activity does not necessarily lead to increased populations load unless an additional generation is produced, it is highly likely that the insect will become a significant pest of open-fields at Mediterranean latitudes above 40° during the next 50 years. Our simulations also implied that current

  13. Projecting pest population dynamics under global warming: the combined effect of inter- and intra-annual variations.

    PubMed

    Zidon, Royi; Tsueda, Hirotsugu; Morin, Efrat; Morin, Shai

    2016-06-01

    The typical short generation length of insects makes their population dynamics highly sensitive not only to mean annual temperatures but also to their intra-annual variations. To consider the combined effect of both thermal factors under global warming, we propose a modeling framework that links general circulation models (GCMs) with a stochastic weather generator and population dynamics models to predict species population responses to inter- and intra-annual temperature changes. This framework was utilized to explore future changes in populations of Bemisia tabaci, an invasive insect pest-species that affects multiple agricultural systems in the Mediterranean region. We considered three locations representing different pest status and climatic conditions: Montpellier (France), Seville (Spain), and Beit-Jamal (Israel). We produced ensembles of local daily temperature realizations representing current and future (mid-21st century) climatic conditions under two emission scenarios for the three locations. Our simulations predicted a significant increase in the average number of annual generations and in population size, and a significant lengthening of the growing season in all three locations. A negative effect was found only in Seville for the summer season, where future temperatures lead to a reduction in population size. High variability in population size was observed between years with similar annual mean temperatures, suggesting a strong effect of intra-annual temperature variation. Critical periods were from late spring to late summer in Montpellier and from late winter to early summer in Seville and Beit-Jamal. Although our analysis suggested that earlier seasonal activity does not necessarily lead to increased populations load unless an additional generation is produced, it is highly likely that the insect will become a significant pest of open-fields at Mediterranean latitudes above 40° during the next 50 years. Our simulations also implied that current

  14. Mushroom growing project at the Los Humeros, Mexico geothermal field

    SciTech Connect

    Rangel, M.E.R.

    1998-12-01

    There are several projects of direct (non-electrical) use of geothermal energy in Mexico. Personnel of the Comision Federal de Electricidad (CFE) have experience in various of these projects, like drying of timber and fruits, space heating, food processing, etc. Taking this in consideration, CFE built the Los Humeros mushroom plant using for heat source the geothermal steam from Well H-1. The main purpose of the project was to take advantage of residual geothermal energy in a food production operation and to develop the appropriate technology. In 1992, existing installations were renovated, preparing appropriate areas for pasteurization, inoculation and production. The mushroom Pleurotus ostreatus var. florida and columbinus was used. A year later, CFE proposed the construction of improved facilities for growing edible mushrooms. New materials and equipment, as well as different operation conditions, were proposed on the basis of the experience gained in the initial project. The construction and renovation activities were completed in 1994.

  15. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    SciTech Connect

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  16. John Day River Subbasin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect

    Powell, Russ M.; Delano, Kenneth H.

    2004-04-01

    Work undertaken in 2003 included: (1) Seven new fence projects were completed thereby protecting 7.6 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) Maintenance of all active project fences (66.14 miles), watergaps (66), spring developments (33) and plantings were checked and repairs performed. (4) Since the initiation of the Fish Habitat Project in 1984 we have 72.94 miles of stream protected using 131.1 miles of fence. With the addition of the Restoration and Enhancement Projects we have 205.96 miles of fence protecting 130.3 miles of stream.

  17. Technology Base Research Project for electrochemical energy storage. Annual report for 1983

    SciTech Connect

    Kinoshita, K.

    1984-05-18

    The Lawrence Berkeley Laboratory (LBL) is the Lead Center for management of the Technology Base Research (TBR) Project, which is supported by DOE's Office of Energy Systems Research, Energy Storage Division. The purpose of this project is to provide the research base which supports DOE efforts to develop electrochemical technology for electric vehicle and stationary energy storage applications. The general objective of the TBR project is to help provide advanced electrochemical systems that can satisfy stringent performance and economic requirements for electric vehicle and stationary energy storage applications. The specific goal of the project is to identify the most promising electrochemical technologies and transfer them to industry and/or another DOE program for further development and scale-up. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR project is divided into four major project elements: Electrochemical Systems Research, Supporting Research, Electrochemical Processes, and Fuel Cells for Vehicles. This report summarizes the research, financial, and management activities relevant to the TBR project in CY 1983. Highlights of each project element are summarized according to the appropriate battery system or electrochemical research area.

  18. Using Field-Metered Data to Quantify Annual Energy Use of Portable Air Conditioners

    SciTech Connect

    Burke, Thomas; Willem, Henry; Ni, Chun Chun; Stratton, Hannah; Chen, Yuting; Ganeshalingam, Mohan; Iyer, Maithili; Price, Sarah; Dunham, Camilla

    2014-12-12

    As many regions of the United States experience rising temperatures, consumers have come to rely increasingly on cooling appliances (including portable air conditioners) to provide a comfortable indoor temperature. Home occupants sometimes use a portable air conditioner (PAC) to maintain a desired indoor temperature in a single room or enclosed space. Although PACs in residential use are few compared to centrally installed and room air conditioning (AC) units, the past few years have witnessed an increase of PACs use throughout the United States. There is, however, little information and few research projects focused on the energy consumption and performance of PACs, particularly studies that collect information from field applications of PACs. The operation and energy consumption of PACs may differ among geographic locations and households, because of variations in cooling load, frequency, duration of use, and other user-selected settings. In addition, the performance of building envelope (thermal mass and air leakage) as well as inter-zonal mixing within the building would substantially influence the ability to control and maintain desirable indoor thermal conditions. Lawrence Berkeley National Laboratory (LBNL) conducted an initial field-metering study aimed at increasing the knowledge and data related to PAC operation and energy consumption in the United States. LBNL performed its field-metering study from mid-April to late October 2014. The study, which monitored 19 sites in the Northeastern United States (4 in upstate New York and 15 near Philadelphia), collected real-time data on PAC energy consumption along with information regarding housing characteristics, consumer behavior, and environmental conditions that were expected to affect PAC performance. Given the limited number of test sites, this study was not intended to be statistically representative of PAC users in the United States but rather to understand the system response to the cooling demand and to

  19. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    SciTech Connect

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  20. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  1. Waste Tank Vapor Characterization Project: Annual status report for FY 1995

    SciTech Connect

    Ligotke, M.W.; Fruchter, J.S.; Huckaby, J.L.; Birn, M.B.; McVeety, B.D.; Evans, J.C. Jr.; Pool, K.H.; Silvers, K.L.; Goheen, S.C.

    1995-11-01

    This report compiles information collected during the Fiscal Year 1995 pertaining to the waste tank vapor characterization project. Information covers the following topics: project management; organic sampling and analysis; inorganic sampling and analysis; waste tank vapor data reports; and the waste tanks vapor database.

  2. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    SciTech Connect

    1995-09-30

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE`s UMTRA Project is the world`s largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation.

  3. Evaluation of Title IV-C ESEA Projects, 1977-1978. Annual Report. Report #7909.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Reports of fourteen program descriptions and evaluations are presented. All but two were produced by the Department of Federal Evaluation Resource Services, a model state evaluation project. The projects varied in purpose; budget; grades served; and number of students, teachers, and administrators participating. Reports vary in detail from one to…

  4. Direct use geothermal PON and PRDA projects under DOE-ID Administration. Annual report FY 1983

    SciTech Connect

    Childs, F.W.

    1984-01-01

    This report presents the status of Geothermal PRDA and PON projects administered by the DOE-ID as of the end of FY-1983. Both programs were instituted to assist the development of the direct application of geothermal energy. The PRDA Program consists of a series of studies designed to investigate the engineering and economic feasibility of geothermal direct applications. The PON Program consists of demonstration projects in which project costs are shared between DOE and a private company, municipality, or other organizations. During this reporting period, fiscal year 1983 (October 1, 1982 through September 30, 1983), EG and G Idaho provided program management and technical support for eleven demonstration projects, three engineering and economic studies plus some general institutional support. Each project is summarized. The general format for the project descriptions is to review the activities in FY-1983 separately from background information on project scope and previous years activities. All of the DOE-ID PON experimental demonstration projects are described, but, of 20 studies performed, only the three active PRDA feasibility contracts are covered since they were smaller, more specialized studies.

  5. Experience Based Career Education Project. Annual Evaluation Report, 1976-1977.

    ERIC Educational Resources Information Center

    Edwards, Judith B.; Van Dusseldorp, Ralph A.

    Fifty-eight Iowa high school seniors participated in an experience based career education (EBCE) project conducted at Storm Lake, Sac City, and Pocahontas during 1976-77. The program followed the EBCE model developed by the Appalachia Educational Laboratory. Technical assistance and training for the project was furnished by that laboratory. A…

  6. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    SciTech Connect

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs.

  7. John Day River Subbasin Fish Habitat Enhancement Project, 2002 Annual Report.

    SciTech Connect

    Powell, Russ M.; Jerome, James P.; Delano, Kenneth H.

    2003-03-01

    Work undertaken in 2002 included: (1) Seven new fence projects were completed thereby protecting 6.0 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) New fence construction (300ft) plus one watergap on Indian Creek/ Kuhl property. (4) Maintenance of all active project fences (58.76 miles), watergaps (56), spring developments (32) and plantings were checked and repairs performed. (5) Restoration and Enhancement projects protected 3 miles of stream within the basin. (6) Since the initiation of the Fish Habitat Project in 1984 we have 67.21 miles of stream protected using 124.2 miles of fence. With the addition of the Restoration and Enhancement Projects we have 199.06 miles of fence protecting 124.57 miles of stream.

  8. Asotin Creek Model Watershed 1997 Habitat Projects, 1997-1998 Annual Progress Report.

    SciTech Connect

    Johnson, B.J.

    1998-12-01

    The installation of fish and wildlife restoration projects on Asotin Creek completed in 1997 include: 11 in-stream habitat restoration projects, 3 reparian exclusion fences, 6 riparian fences, 14 sediment basin constructions, 54 sediment basin cleanouts, 1 multi-purpose pond construction, 1800 ft of terraces, and 1 three month water quality study. In-stream project objectives were to increase the number of large pools with complex fish habitat containing LWD, re-establish the steambank stability, and reduce in-stream temperatures. Most of the projects listed above were cost-share on private land with the landowners paying 50%-10% of the project costs and signing a ten-year maintenance agreement.

  9. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    SciTech Connect

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  10. The P.K. Yonge Annual Invitational Track and Field Meet; A Model for Organizing and Conducting a High School Invitational. Resource Monograph No. 10.

    ERIC Educational Resources Information Center

    Stewart, Kirby

    This monograph deals with the practical problems of organizing and conducting a large track meet. Its purpose is to serve as a guide to coaches and athletic directors who have had little experience in such an operation. Cited is the P.K. Yonge Annual Invitational Track and Field Meet, an annual high school track meet for class AA schools in North…

  11. Small-Scale Geothermal Power Plant Field Verification Projects: Preprint

    SciTech Connect

    Kutscher, C.

    2001-07-03

    In the spring of 2000, the National Renewable Energy Laboratory issued a Request for Proposal for the construction of small-scale (300 kilowatt [kW] to 1 megawatt [MW]) geothermal power plants in the western United States. Five projects were selected for funding. Of these five, subcontracts have been completed for three, and preliminary design work is being conducted. The three projects currently under contract represent a variety of concepts and locations: a 1-MW evaporatively enhanced, air-cooled binary-cycle plant in Nevada; a 1-MW water-cooled Kalina-cycle plant in New Mexico; and a 750-kW low-temperature flash plant in Utah. All three also incorporate direct heating: onion dehydration, heating for a fish hatchery, and greenhouse heating, respectively. These projects are expected to begin operation between April 2002 and September 2003. In each case, detailed data on performance and costs will be taken over a 3-year period.

  12. Hood River and Pelton Ladder Monitoring and Evaluation Project and Hood River Fish Habitat Project : Annual Progress Report 1999-2000.

    SciTech Connect

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-02-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat [contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000.

  13. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    SciTech Connect

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  14. Wake fields effects for the eRHIC project

    SciTech Connect

    Fedotov A. V.; Belomestnykh, S.; Kayran, D.; Litvinenko, V.; Ptitsyn, V.

    2012-05-20

    An Energy Recovery Linac (ERL) with a high peak electron bunch current is proposed for the Electron-Ion collider (eRHIC) project at the Brookhaven National Laboratory. The present design is based on the multi-pass electron beam transport in existing tunnel of the Relativistic Heavy Ion Collider (RHIC). As a result of a high peak current and a very long beam transport, consideration of various collective beam dynamics effects becomes important. Here we summarize effects of the coherent synchrotron radiation, resistive wall, accelerating cavities and wall roughness on the resulting energy spread and energy loss for several scenarios of the eRHIC project.

  15. Implementing EBIPM In The Field: Tackling Invasive Annual Grasses With Science-based Solutions

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The rapid expansion of invasive annual grasses on rangeland fuels the need for action on the part of resource and land managers. Ecologically-based invasive plant management (EBIPM) is a new management method and it will require multiple media platforms to disseminate with various means of instructi...

  16. Major Differences: Examining Student Engagement by Field of Study. Annual Results 2010

    ERIC Educational Resources Information Center

    National Survey of Student Engagement, 2010

    2010-01-01

    The National Survey of Student Engagement (NSSE) documents dimensions of quality in undergraduate education and provides information and assistance to colleges, universities, and other organizations to improve student learning. Its primary activity is annually surveying college students to assess the extent to which they engage in educational…

  17. Wind River Watershed Project; Volume II of III Reports F and G, 1998 Annual Report.

    SciTech Connect

    Connolly, Patrick J.

    1999-11-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds.

  18. NEED (National Energy Education Day) Project: Annual report and national recognition ceremonies. [National Energy Education Day

    SciTech Connect

    Not Available

    1987-06-01

    ''NEED'' stands for National Energy Education Day. This short document reports on NEED awards, the impact of NEED, the national recognition ceremonies, and award-winning 1987 NEED school projects. (DLC)

  19. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  20. Field Guide to Plutonic and Metamorphic Rocks. Earth Science Curriculum Project Pamphlet Series PS-5.

    ERIC Educational Resources Information Center

    Romey, William D.

    Suggested are methods for the collection of field evidence about processes that form plutonic and metamorphic rock. Description and discussion of these types of rocks are provided. The planning and execution of a successful field trip is discussed. Advanced field projects are also discussed. Included are five appendices, references, and a…

  1. Field Guide to Layered Rocks. Earth Science Curriculum Project Pamphlet Series PS-3.

    ERIC Educational Resources Information Center

    Freeman, Tom

    Presented is the study of sequences of rock layers as the basis for historical geology. Also considered is the influence of rock layers on the appearance of the landscape. Specific relevant laws of geology are presented. Preparation for a field trip is discussed. An example field trip is discussed and field techniques and projects are reviewed.…

  2. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    SciTech Connect

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  3. Psoriasis and psoriatic arthritis video project: an update from the 2012 GRAPPA annual meeting.

    PubMed

    Callis Duffin, Kristina; Armstrong, April W; Mease, Philip J

    2013-08-01

    The Group for Research and Assessment of Psoriasis and Psoriatic Arthritis (GRAPPA) has developed online videos intended to provide training on the most commonly used physical examination measures for psoriasis and psoriatic arthritis (PsA). At the 2012 GRAPPA annual meeting, attendees were updated on the development, availability, use, and validation of these video modules. To date, 1300 users from 45 different countries have used the Psoriasis Area and Severity Index (PASI) module at least once. Results were presented from a recently completed study of pre- and post-video scoring of the PASI by experienced and naive physicians and patient assessors. Future modifications of the video collection were also discussed.

  4. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    SciTech Connect

    Shaw, R. Todd; Sexton, Amy D.

    2003-02-01

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included

  5. Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin, Utah. Annual report, October 1, 1995--September 30, 1996

    SciTech Connect

    Morgan, C.D.; Allison, M.L.

    1997-08-01

    The Bluebell field is productive from the Tertiary lower Green River and Wasatch Formations of the Uinta Basin, Utah. The productive interval consists of thousands of feet of interbedded fractured clastic and carbonate beds deposited in a fluvial-dominated lacustrine environment. Wells in the Bluebell field are typically completed by perforating 40 or more beds over 1,000 to 3,000 vertical feet (300-900 m), then stimulating the entire interval. This completion technique is believed to leave many potentially productive beds damaged and/or untreated, while allowing water-bearing and low-pressure (thief) zones to communicate with the wellbore. Geologic and engineering characterization has been used to define improved completion techniques. A two-year characterization study involved detailed examination of outcrop, core, well logs, surface and subsurface fractures, produced oil-field waters, engineering parameters of the two demonstration wells, and analysis of past completion techniques and effectiveness. The characterization study resulted in recommendations for improved completion techniques and a field-demonstration program to test those techniques. The results of the characterization study and the proposed demonstration program are discussed in the second annual technical progress report. The operator of the wells was unable to begin the field demonstration this project year (October 1, 1995 to September 20, 1996). Correlation and thickness mapping of individual beds in the Wasatch Formation was completed and resulted in a. series of maps of each of the individual beds. These data were used in constructing the reservoir models. Non-fractured and fractured geostatistical models and reservoir simulations were generated for a 20-square-mile (51.8-km{sup 2}) portion of the Bluebell field. The modeling provides insights into the effects of fracture porosity and permeability in the Green River and Wasatch reservoirs.

  6. Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    2001-12-31

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilities in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360

  7. John Day River Subbasin Fish Habitat Enhancement Project, 2005-2006 Annual Report.

    SciTech Connect

    Powell, Russ M.; Alley, Pamela D.; Delano, Kenneth H.

    2006-03-01

    Work undertaken in 2005 included: (1) Four new fence projects were completed thereby protecting 7.55 miles of stream with 9.1 miles of new riparian fence (2) Fence removal 1.7 miles of barbed wire. (3) Completed three spring developments (repair work on two BLM springs on Cottonwood Creek (Dayville), 1 solar on Rock Creek/ Collins property). (4) Dredge tail leveling completed on 0.9 miles of the Middle Fork of the John Day River (5) Cut, hauled and placed 30 junipers on Indian Creek/Kuhl property for bank stability. (6) Collected and planted 1500 willow cuttings on Mountain Creek/Jones property. (7) Conducted steelhead redd counts on Lake Cr./Hoover property and Cottonwood Cr./Mascall properties (8) Seeded 200 lbs of native grass seed on projects where the sites were disturbed by fence construction activities. (9) Maintenance of all active project fences (72.74 miles), watergaps (60), spring developments (30) were checked and repairs performed. (10) Since the initiation of the Fish Habitat Program in 1984 we have installed 156.06 miles of riparian fence on leased property protecting 88.34 miles of anadromous fish bearing stream. With the addition of the Restoration and Enhancement Projects from 1996-2001, where the landowner received the materials, built and maintained the project we have a total of 230.92 miles of fence protecting 144.7 miles of stream and 3285 acres of riparian habitat.

  8. Advanced Neutron Source (ANS) Project: Annual report, April 1987--March 1988

    SciTech Connect

    Selby, D.L.; Harrington, R.M.; Peretz, F.J.; McBee, M.R.

    1989-02-01

    The Advanced Neutron Source (ANS) Project (formerly called the Center for Neutron Research) will provide the world's best facilities for the study of neutron scattering. The ANS high-power density reactor will be fueled with uranium silicide and cooled, moderated, and reflected by deuterium oxide. Peak neutron fluxes in the reflector are expected to be 5 to 10 x 10/sup 19/ neutrons/center dot/m/sup -2//center dot/s/sup -1/ with a power level between 270 and 300 MW. This report describes the status of technical work funded through the ANS Project during the period April 1987 through March 1988. Earlier work is described in Center for Neutron Research Project Status Report and other Oak Ridge National Laboratory reports. 22 refs., 57 figs., 23 tabs.

  9. Technology Base Research Project for electrochemical energy storage: Annual report for 1986

    SciTech Connect

    Kinoshita, K.

    1987-07-01

    The US DOE Office of Energy Storage and Distribution provides continuing support for an Energy Storage Program, which includes R and D on advanced electrochemical energy storage and conversion systems. A major goal of this program is to develop electrochemical power sources suitable for application in electric vehicles and/or electric load-leveling devices. The program centers on advanced secondary batteries and fuel cells that offer the potential for high performance and low life-cycle costs. The Technology Base Research Project is divided into three major project elements: Exploratory Research, Applied Science Research, and Air Systems Research. Highlights of each project element are summarized according to the appropriate battery system or electrochemical research area. Cells covered include molten salt, lithium, alkaline, zinc/halogen, alkali/sulfur, nonaqueous, metal/air, fuel cell.

  10. SERI Solar Radiation Resource Assessment Project: Fiscal Year 1990 Annual Progress Report

    SciTech Connect

    Riordan, C; Maxwell, E; Stoffel, T; Rymes, M; Wilcox, S

    1991-07-01

    The purpose of the Solar Radiation Resource Project is to help meet the needs of the public, government, industry, and utilities for solar radiation data, models, and assessments as required to develop, design, deploy, and operate solar energy conversion systems. The project scientists produce information on the spatial (geographic), temporal (hourly, daily, and seasonal), and spectral (wavelength distribution) variability of solar radiation at different locations in the United States. Resources committed to the project in FY 1990 supported about four staff members, including part-time administrative support. With these resources, the staff must concentrate on solar radiation resource assessment in the United States; funds do not allow for significant efforts to respond to a common need for improved worldwide data. 34 refs., 21 figs., 6 tabs.

  11. NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

    SciTech Connect

    Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

    2014-06-01

    In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

  12. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  13. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    SciTech Connect

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  14. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  15. John Day River Subbasin Fish Habitat Enhancement Project, 2000 Annual Report.

    SciTech Connect

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    2001-01-01

    During 2000, 3 new projects were completed thereby adding 4.6 miles of stream to the program. Protection for these reaches required the construction of 3.2 miles of riparian fence and 1 livestock watering sites. 5,750 pounds of grass and shrub seed were planted for revegetating ground disturbed during construction. Stream temperatures were monitored on the Middle Fork of the John Day. All project fences, watergaps, spring developments and plantings were checked and repairs performed where needed. We now have 70 miles of stream protected using 111 miles of fence.

  16. Scientific Discovery through Advanced Computing (SciDAC-3) Partnership Project Annual Report

    SciTech Connect

    Hoffman, Forest M.; Bochev, Pavel B.; Cameron-Smith, Philip J..; Easter, Richard C; Elliott, Scott M.; Ghan, Steven J.; Liu, Xiaohong; Lowrie, Robert B.; Lucas, Donald D.; Ma, Po-lun; Sacks, William J.; Shrivastava, Manish; Singh, Balwinder; Tautges, Timothy J.; Taylor, Mark A.; Vertenstein, Mariana; Worley, Patrick H.

    2014-01-15

    The Applying Computationally Efficient Schemes for BioGeochemical Cycles ACES4BGC Project is advancing the predictive capabilities of Earth System Models (ESMs) by reducing two of the largest sources of uncertainty, aerosols and biospheric feedbacks, with a highly efficient computational approach. In particular, this project is implementing and optimizing new computationally efficient tracer advection algorithms for large numbers of tracer species; adding important biogeochemical interactions between the atmosphere, land, and ocean models; and applying uncertainty quanti cation (UQ) techniques to constrain process parameters and evaluate uncertainties in feedbacks between biogeochemical cycles and the climate system.

  17. Umatilla River Basin Anadromus Fish Habitat Enhancement Project : 1994 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    1994-05-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, Section 7.6-7.8 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower l/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994-95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation. Four 15 year riparian easements and two right-of-way agreements were secured for enhancement of one river mile on Wildhorse Creek and l/2 river mile on Meacham Creek. Enhancements implemented between river mile (RM) 9.5 and RM 10.5 Wildhorse Creek included: (1) installation of 1.43 miles of smooth wire high tensile fence line and placement of 0.43 miles of fence posts and structures to restrict livestock from the riparian corridor, (2) construction of eighteen sediment retention structures in the stream channel to speed riparian recovery by elevating the stream grade, slowing water velocities and

  18. Measuring and Interpreting the Urban Heat Island: A Student Field Project

    ERIC Educational Resources Information Center

    Nicholas, Frank

    1976-01-01

    Climatology field experiences are described showing that midlatitude cities show manifestations of the modified thermal environment known as the heat island. Suggestions for project planning and precautions regarding weather, timing, and safety are included. (AV)

  19. Linking Learning Style Theory with Retention Research: The TRAILS Project. AIR 1986 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Kalsbeek, David H.

    The Myers-Briggs Type Indicator (MBTI), a measure of personality type and learning style, was used at Saint Louis University in the TRAILS (Tracking Retention and Academic Integration by Learning Style) Project. In addition to considering links between learning styles and student academic achievement and aptitude, MBTI was used to identify…

  20. American Diploma Project (ADP) End-of-Course Exams: 2010 Annual Report

    ERIC Educational Resources Information Center

    Achieve, Inc., 2010

    2010-01-01

    To assess the raised expectations of college and career readiness for all students, a group of American Diploma Project (ADP) Network states formed the ADP Assessment Consortium in 2005. The Consortium created Algebra I and II end-of-course exams, based in large part on Achieve's ADP mathematics benchmarks, which would provide an honest assessment…

  1. Teenage Pregnancy and Parenting Project. 1983-84 Annual Report and Evaluation.

    ERIC Educational Resources Information Center

    San Francisco Family Service Agency, CA.

    The Teenage Pregnancy and Parenting Project (TAPP) of San Francisco is a city-wide interagency service system coordinated by the city's Family Service Agency and Unified School District. Clients participate in pre- or post-natal service systems that provide free, personal, and continuous counseling for up to three years. Case managers identify and…

  2. John Day River Sub-Basin Fish Habitat Enhancement Project; 1998 Annual Report.

    SciTech Connect

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    1999-02-01

    During 1998, three new projects were completed improving 1.8 miles of stream and riparian habitat. Protection for these reaches required the construction of 3.2 miles of riparian fence and 7 livestock water gaps. A previously leased property on the Mainstream was converted from apriarian pasture to a corridor fence after no significant recovery had occurred.

  3. Using Spreadsheet Modeling Techniques for Capital Project Review. AIR 1985 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Kaynor, Robert K.

    The value of microcomputer modeling tools and spreadsheets to help college institutional researchers analyze proposed capital projects is discussed, along with strengths and weaknesses of different software packages. Capital budgeting is the analysis that supports decisions about the allocation and commitment of funds to long-term capital…

  4. Home-Centered Prevention Project. Annual Report. September 1, 1986, through August 31, 1987.

    ERIC Educational Resources Information Center

    Flores, Joe G., Jr.

    This document reports on the Home-Centered Prevention (HCP) Project, located in San Antonio, Texas within the Texas Department of Human Services Region 9, which was designed to implement and test a model for in-home services to families in which child abuse had occurred. It contains a process evaluation describing the first-year efforts of project…

  5. Little Naches River Passage Project : Annual Report FY90 and FY89.

    SciTech Connect

    Woods, Dianna; Russell, Kent N.; Haner, Jill

    1991-03-01

    As part of the implementation of section 704d(1) of the Northwest Power Planning Council's Fish and Wildlife Program, the USDA Forest Service received funding from the Bonneville Power Administration to improve passage for anadromous salmonids on the Little Naches River: tributary to the Naches, Yakima, and Columbia Rivers. The project's goal was to provide anadromous salmonid access to an additional 24 miles of stream habitat in the Little Naches River and its tributaries. The target species for this project are chinook salmon (Oncorhynchus tshawytscha), steelhead trout (Oncorhynchus mykiss), and potentially coho salmon (Oncorhynchus kisutch). The project was divided into two subprojects. The first consisted of the construction and maintenance of a concrete fishway to allow anadromous salmonid passage at Salmon Falls. The second sub-project rehabilitated the stream channel below Salmon Falls to permit fish migration to the Falls during low flows. Both subprojects were completed in 1987, essentially on budget. This report documents the monitoring and maintenance work performed to date.

  6. An Economically Driven Enrollment Projections Model. AIR 1986 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Yost, Michael, Jr.; Chino, Laney

    An admissions/enrollment model was developed using 5 years of data on undergraduate and graduate enrollment, admissions, budget and tuition revenues, and anticipated tuition costs. The model produced estimates of admissions and enrollment numbers required to meet projected increases in the institutional budget. Using a variation of the Markov…

  7. 24 CFR 891.570 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SUPPORTIVE HOUSING FOR THE ELDERLY AND PERSONS WITH DISABILITIES Loans for Housing for the Elderly and Persons with Disabilities Section 202 Projects for the Elderly...

  8. Illinois State University Kellogg Project. Professional Development Center. Teaching-Learning Center. Third Annual Report, 1978.

    ERIC Educational Resources Information Center

    Rives, Stanley G.; And Others

    The third year report of a four-year Kellogg project to develop a model faculty and instructional development program is presented. The goals for the third year are outlined and details of the activities of the Teaching-Learning Center are discussed. Among the activities described are consulting with faculty members, funding to enable faculty to…

  9. School Improvement Project: 1983-84. Fifth Annual Process Assessment. OEA Evaluation Report.

    ERIC Educational Resources Information Center

    Canner, Jane; And Others

    The primary goal of the School Improvement Project (SIP), administered by the central office of New York City (New York) Public Schools, is to improve academic achievement through school-based planning. A planning committee representing the various school constituencies is responsible for developing and implementing a comprehensive plan to effect…

  10. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1993 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    1993-04-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program Measure 704 (d) (1) 34.02 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River (downstream of the Meacham Creek confluence upstream to the Reservation East Boundary). In 1993, the project shifted emphasis to a comprehensive watershed approach consistent with other basin efforts and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. Maintenance of existing habitat improvement projects was included under this comprehensive approach. Maintenance of existing gravel traps, instream and bank stabilization structures was required within project areas during the reporting period due to spring flooding damage and high bedload movement. Maintenance activities were completed between river mile (RM) 0.0 and RM 0.25 Boston Canyon Creek, between RM 0.0 and RM 4 Meacham Creek and between RM 78.5 and RM 79 Umatilla River. Habitat enhancement areas were seeded with native grass, legume, shrub and wildflower mixes and planted with willow cuttings to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and photo

  11. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    SciTech Connect

    McGowan, Vance

    2003-08-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    SciTech Connect

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  13. High field superconductor development and understanding project, Final Report

    SciTech Connect

    Larbalestier, David C.; Lee, Peter J.

    2009-07-15

    Over 25 years the Applied Superconductivity Center at the University of Wisconsin-Madison provided a vital technical resource to the High Energy Physics community covering development in superconducting strand for HEP accelerator magnet development. In particular the work of the group has been to develop the next generation of high field superconductors for high field application. Grad students Mike Naus, Chad Fischer, Arno Godeke and Matt Jewell improved our understanding of the microstructure and microchemistry of Nb3Sn and their impact on the physical and mechanical properties. The success of this work has led to the continued funding of this work at the ASC after it moved to the NHMFL and also to direct funding from BNL for some aspects of Nb3Sn cable evaluation.

  14. The Ins & Outs of Developing a Field-Based Science Project: Learning by Lassoing Lizards

    ERIC Educational Resources Information Center

    Matthews, Catherine E.; Huffling, Lacey D.; Benavides, Aerin

    2014-01-01

    We describe a field-based lizard project we did with high school students as a part of our summer Herpetological Research Experiences. We describe data collection on lizards captured, identified, and marked as a part of our mark-recapture study. We also describe other lizard projects that are ongoing in the United States and provide resources for…

  15. Use of a Laboratory Field Project in an Introductory Crop Science Course.

    ERIC Educational Resources Information Center

    Lane, Robert A.

    1986-01-01

    Assesses the benefits resulting from a laboratory field project and report for agricultural students in an introductory crop science course. Student responses to evaluation statements indicated that the project helped them identify crops, understand cultural and management practices, and recognize environmental influences that affect crop…

  16. Chief Joseph Kokanee Enhancement Project : Confederated Tribes of the Colville Reservaton 1997 Annual Report.

    SciTech Connect

    LeCaire, Richard

    1998-01-01

    In the early 1980's the Confederated Tribes of the Colville Reservation, the Spokane Tribe of Indians and the Washington Dept. of Fish and Wildlife developed a management plan for Lake Roosevelt on the restoration and enhancement of kokanee salmon populations using hatchery out plants and the restoration of natural spawning runs. The plan was incorporated into the Northwest Power Planning Council (NPPC) in their 1987 Columbia Basin Fish and Wildlife program as partial mitigation for hydropower caused fish losses resulting from the construction of Grand Coulee Dam. The Chief Joseph Kokanee Enhancement Project, as part of a basin wide effort, is evaluating the status of the natural production kokanee in streams tributary to Lakes Roosevelt and Rufus Woods and is examining entrainment through Grand Coulee Dam. The goal of this project is the protection and enhancement of the natural production kokanee in these two lakes. The project is currently collecting data under four phases or parts. Since 1991, Lake Whatcom Washington origin kokanee have been planted in considerable numbers into the waters of Lake Roosevelt. A natural production kokanee fishery has persisted in the lake since the early 1970's(Cash, 1995), (Scholz, 1991). Historical information alludes to wild Kokanee production in the San Poil River, Nespelem River, Big Sheep Creek, Ora-Pa-Ken Creek, Deep Creek and Onion Creeks. The genetic makeup of the fish within the fishery is unknown, as is their contribution to the fishery. The level of influence by the hatchery out planted stock on wild fish stocks is unknown as well. Project outcomes will indicate the genetic fitness for inclusion of natural production kokanee stocks into current Bonneville Power Administration funded hatchery programs. Other findings may determine contribution/interaction of/between wild/hatchery kokanee stocks found in the waters of Lake Franklin D. Roosevelt.

  17. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    SciTech Connect

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  18. Yakima/Klickitat Fisheries Project - Klickitat Monitoring and Evaluation, 2007 Annual Report.

    SciTech Connect

    Zendt, Joe; Babcock, Mike

    2006-04-02

    This report describes the results of monitoring and evaluation (M&E) activities for salmonid fish populations and habitat in the Klickitat River subbasin in south-central Washington. The M&E activities described here were conducted as a part of the Bonneville Power Administration (BPA)-funded Yakima/Klickitat Fisheries Project (YKFP) and were designed by consensus of the scientists with the Yakama Nation (YN) Fisheries Program. YKFP is a joint project between YN and Washington Department of Fish and Wildlife (WDFW). Overall YKFP goals are to increase natural production of and opportunity to harvest salmon and steelhead in the Yakima and Klickitat subbasins using hatchery supplementation, harvest augmentation and habitat improvements. Klickitat subbasin M&E activities have been subjected to scientific and technical review by members of the YKFP Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP biologists have transformed the conceptual design into the tasks described. YKFP biologists have also been involved with the Collaborative Systemwide Monitoring and Evaluation Project (CSMEP - a project aimed at improving the quality, consistency, and focus of fish population and habitat data to answer key M&E questions relevant to major decisions in the Columbia Basin) and are working towards keeping Klickitat M&E activities consistent with CSMEP recommendations. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - to gather baseline information in order to characterize habitat and salmonid populations pre- and post-habitat restoration and pre-supplementation. (2) Ecological Interactions - to determine presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information. (3) Genetics - to develop YKFP supplementation broodstock collection

  19. Coal diesel combined-cycle project. Annual report, January 1996--January 1997

    SciTech Connect

    1997-12-31

    The Clean Coal Diesel project will demonstrate a new Clean Coal Technology that has technical, economic and environmental advantages over conventional power generating methods. This innovative technology enables utilization of coal-based fuel in large-bore, medium-speed, diesel engines. Modular power generating applications in the 10 to 100 megawatt size range are the target applications. The University of Alaska campus in Fairbanks, Alaska, is the project`s host site. At this location, the University will construct and operate the Clean Coal Diesel System, which will serve as a 6.2 MW diesel powerplant addition. The University will also assemble and operate a 5-ton per hour coal-water fuel processing plant. The plant will utilize local coal, brought by truck from Usibelli`s mine in Healey, AK. The estimated performance characteristics of the mature commercial embodiment of the Clean Coal Diesel, if achieved, will make this technology quite competitive: 48% efficiency; $1,300/kW installed cost; and emission levels controlled to 50--70% below New Source Performance Standards. Specific objectives are to demonstrate that the Coal Diesel Technology: is durable and can operate 6,000 hours in a realistic commercial setting; will meet efficiency targets; can effectively control criteria pollutants to levels that are well below anticipated standards, as well as reduce greenhouse gas emissions; and can accommodate substantial power demand swings.

  20. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect

    Volkman, Jed

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  1. John Day River Sub-Basin Fish Habitat Enhancement Project; 2008 Annual Report

    SciTech Connect

    Powell, Russ M.; Alley, Pamela D.; Goin Jr, Lonnie

    2009-07-15

    Work undertaken in 2008 included: (1) Seven new fence projects were completed thereby protecting approximately 10.97 miles of streams with 16.34 miles of riparian fence; (2) Renewal of one expired lease was completed thereby continuing to protect 0.75 miles of stream with 1.0 mile of riparian fence. (3) Maintenance of all active project fences (106.54 miles), watergaps (78), spring developments (33) were checked and repairs performed; (3) Planted 1000 willow/red osier on Fox Creek/Henslee property; (4) Planted 2000 willows/red osier on Middle Fork John Day River/Coleman property; (5) Planted 1000 willow/red osier cuttings on Fox Creek/Johns property; (6) Since the initiation of the Fish Habitat Project in 1984 we have 126.86 miles of stream protected using 211.72 miles of fence protecting 5658 acres. The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring Chinook and summer steelhead within the sub basin through habitat protection, enhancement and fish passage improvement. The John Day River system supports the largest remaining wild runs of spring chinook salmon and summer steelhead in Northeast Oregon.

  2. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  3. Angular momentum projection for a Nilsson mean-field plus pairing model

    NASA Astrophysics Data System (ADS)

    Wang, Yin; Pan, Feng; Launey, Kristina D.; Luo, Yan-An; Draayer, J. P.

    2016-06-01

    The angular momentum projection for the axially deformed Nilsson mean-field plus a modified standard pairing (MSP) or the nearest-level pairing (NLP) model is proposed. Both the exact projection, in which all intrinsic states are taken into consideration, and the approximate projection, in which only intrinsic states with K = 0 are taken in the projection, are considered. The analysis shows that the approximate projection with only K = 0 intrinsic states seems reasonable, of which the configuration subspace considered is greatly reduced. As simple examples for the model application, low-lying spectra and electromagnetic properties of 18O and 18Ne are described by using both the exact and approximate angular momentum projection of the MSP or the NLP, while those of 20Ne and 24Mg are described by using the approximate angular momentum projection of the MSP or NLP.

  4. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 1999.

    SciTech Connect

    Jones, Charles D.

    2000-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  5. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 2000.

    SciTech Connect

    Sear, Sheri

    2001-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  6. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project : Annual Report 1998.

    SciTech Connect

    Jones, Charles D.

    1999-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Personnel of three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI) and

  7. Project life-(laboratory investigations and field experiences) an NSF/Louisana systemic initiatives project

    SciTech Connect

    Radford, D.R.; Ramsey, L.L.

    1994-12-31

    Project LIFE, an in-service program for middle grade teachers of life sciences, focuses on ecology, environmental science, and organismal biology. Project components include an intensive summer course, leadership training, and academic year follow-up through workshops and classroom visits. Teachers are taught by an experienced staff including university scientists, a science educator, and an outstanding middle grades teacher who model a hands-on, learning-cycle style of teaching. Teachers learn science content, process skills, and reform teaching methodology. The course integrates math with science and emphasizes the relationship of science content to the real world. Teachers experience alternative types of assessment including performance-based tasks, journals, concept maps, and questions that promote critical thinking. Participants keep an on-going record of their accomplishments in a Project LIFE portfolio; and receive science supply money from the project and their local system to purchase supplies for classrooms. Project LIFE has trained teachers in Louisiana and Texas and is expanding to other states.

  8. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    SciTech Connect

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  9. Liquid and Gaseous Waste Operations Project Annual Operating Report CY 1999

    SciTech Connect

    Maddox, J.J.; Scott, C.B.

    2000-03-01

    A total of 5.77 x 10 7 gallons (gal) of liquid waste was decontaminated by the Process Waste Treatment Complex (PWTC) - Building 3544 ion exchange system during calendar year (CY) 1999. This averaged to 110 gpm throughout the year. An additional 3.94 x 10 6 gal of liquid waste (average of 8 gpm throughout the year) was decontaminated using the zeolite treatment system due to periods of high Cesium levels in the influent wastewater. A total of 6.17 x 10 7 gal of liquid waste (average of 118 gpm throughout the year) was decontaminated at Building 3544 during the year. During the year, the regeneration of the ion exchange resins resulted in the generation of 8.00 x 10 3 gal of Liquid Low-Level Waste (LLLW) concentrate and 9.00 x 10 2 gal of LLLW supernate. See Table 1 for a monthly summary of activities at Building 3544. Figure 1 shows a diagram of the Process Waste Collection and Transfer System and Figure 2 shows a diagram of the Building 3544 treatment process. Figures 3, 4 5, and 6 s how a comparison of operations at Building 3544 in 1997 with previous years. Figure 7 shows a comparison of annual rainfall at Oak Ridge National Laboratory (ORNL) since 1995.

  10. Inter-annual variations of CO2 observed by commercial airliner in the CONTRAIL project

    NASA Astrophysics Data System (ADS)

    Sawa, Yousuke; Machida, Toshinobu; Matsueda, Hidekazu; Niwa, Yosuke; Umezawa, Taku

    2016-04-01

    Since 2005, we have conducted an observation program for greenhouse gases using the passenger aircraft of the Japan Airlines named Comprehensive Observation Network for TRace gases by AIrLiner (CONTRAIL). Over the past 10 years, successful operation of Continuous CO2 Measuring Equipment (CME) has delivered more than 6 million in-situ CO2 data from about 12000 flights between Japan and Europe, Australia, North America, or Asia. The large number of CME data enable us to well characterize spatial distributions and seasonal changes of CO2 in wide regions of the globe especially the Asia-Pacific regions. While the mean growth rates for the past 10 years were about 2 ppm/year, large growth rates of about 3 ppm/year were found in the wide latitudinal bands from 30S to 70N from the second half of 2012 to the first half of 2013. The multiyear data sets have the potential to help understand the global/regional CO2 budget. One good example is the significant inter-annual difference in CO2 vertical profiles observed over Singapore between October 2014 and October 2015, which is attributable to the massive biomass burnings in Indonesia in 2015.

  11. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1995

    SciTech Connect

    Hartman, M.J.

    1996-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1994 and September 1995. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

  12. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2001-2002.

    SciTech Connect

    Sears, Sheryl

    2003-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  13. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2002-2003.

    SciTech Connect

    Sears, Sheryl

    2004-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  14. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2000-2001 Annual Report.

    SciTech Connect

    Busack, Craig A.; Schroder, Steven L.; Young, Sewall F.

    2002-11-01

    Genetic work for 2001 consisted of two major phases, both reported on here. The first is a DNA microsatellite analysis of several hundred juveniles from the experimental spawning channel at the Cle Elum Supplementation Research Facility, using the genetic markers to assign the juveniles to parents, and thus judge reproductive success of individual fish. The second is a reevaluation and revision of plans for studying domestication in the spring chinook supplementation effort. The pedigree analysis was significant in three respects. First, it showed that this approach can be successfully applied to the spawning channel research. Secondly it showed that this approach does indeed yield very useful information about the relative reproductive success of fish in the channel. Finally, it showed that this information can yield additional information about the experimental design. Of the 961 juveniles on which analysis was attempted, 774 yielded enough genetic information to be used in the pedigree analysis. Of these, 754 were assigned to males and females known to have been placed into the channel. Of the other 20, all were assignable to females, but sires were unknown. The genotypes of 17 of these were consistent with a single theoretical male genotype, suggesting a single precocial male sired them. The inferred parentage of the fish demonstrated that there had been substantial leakage of juveniles from one section of the channel into another. Reproductive success of females was fairly even, but success of males varied considerably. In a group of seven males (including the hypothetical one), one contributed 79% of the progeny analyzed, and three contributed none. The domestication experimental design evaluation was prompted by a critical review of the project by the Independent Scientific Review Panel (ISRP). The ISRP review set into motion a design revision process which extended beyond the contract period; the report presented here is intended to be an account of our

  15. Notes on the Curriculum Field 1978. The First Annual State of the Art Address.

    ERIC Educational Resources Information Center

    Pinar, William F.

    This paper was one of two presentations made at a session designed to provide for the field of curriculum and assessment of its methodological and substantive status, as well as an assessment of the implications of that status for practice. The recent history of the field is sketched briefly. The ideas "curricular possibilities" and "improvement"…

  16. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    SciTech Connect

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions favorable for a fish

  17. Umatilla River Basin Anadromous Fish Habitat Enhancement Project: 1990 Annual Report.

    SciTech Connect

    Scheeler, Carl A.

    1991-01-01

    The Umatilla habitat improvement program is funded under the Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program measure 704 (d) (1) 34.02, and targets the improvement of water quality and the restoration of riparian areas, spawning and rearing habitat of steelhead, spring and fall chinook and coho salmon. The Confederated Tribes of the Umatilla Indian Reservation are responsible for enhancing stream reaches within the Reservation boundaries as guided by an implementation plan developed cooperatively with the Oregon Department of Fish and Wildlife and the USDA Forest Service, Umatilla National Forest. Treatment areas included the lower 4 miles of Meacham Creek, the lower {1/4} mile of Boston Canyon Creek, and the Umatilla River between RM 78.5 and 80. The upper {1/2} of the Meacham Creek project area including Boston Canyon Creek, which were initially enhanced during 1989, were reentered for maintenance and continued enhancements. Approximately 2400 cu. yds. of boulders and 1000 cu. yds. of riprap was used in the construction of in-stream, stream bank and flood plain structures and in the anchoring of large organic debris (LOD) placements. In-stream structures were designed to increase instream cover and channel stability and develop of a defined thalweg to focus low summer flows. Flood plain structures were designed to reduce sediment inputs and facilitate deposition on flood plains. Riparian recovery was enhanced through the planting of over 1000 willow cuttings and 400 lbs. of grass seed mix and through the exclusion of livestock from the riparian corridor with 4.5 miles of high tensile smooth wire fence. Photo documentation and elevational transects were used to monitor changes in channel morphology and riparian recovery at permanent standardized points throughout the projects. Water quality (temperature and turbidity) data was collected at locations within the project area and in tributaries programmed for future enhancements.

  18. The Floating Lab Research Project: An Approach to Evaluating Field Programs.

    ERIC Educational Resources Information Center

    Brody, Michael J.

    This report explains an evaluative study of the conceptual and affective development of students associated with the Floating Lab Program, an experiential field project sponsored by the University of New Hampshire and the Maine Sea Grant Program. The field program involved an opportunity for students to have hands-on experiences aboard a 65-foot…

  19. The Urban Heat Island: a Student Field Project with Community Interest Overtones.

    ERIC Educational Resources Information Center

    Mattingly, Paul

    1979-01-01

    Describes a student field project which measured and interpreted ground-level aspects of the urban heat island in Bloomington-Normal, Illinois. Discusses procedural steps and decisions, field procedures, data compiling, findings, evaluation, and dissemination of results. (Author/CK)

  20. 76 FR 78938 - Carpinteria Offshore Field Redevelopment Project-Developmental Drilling Into the Carpinteria...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Bureau of Ocean Energy Management Carpinteria Offshore Field Redevelopment Project--Developmental Drilling Into the Carpinteria Offshore Field Oil and Gas Reserves, California State Waters, From Federal... jointly review a proposal to develop offshore oil and gas resources, located in California state...

  1. Oregon Wildlife Planning Coordination Project, October 1, 1998 to September 30, 1999 Annual Report.

    SciTech Connect

    Barnes, Susan P.

    1999-10-05

    The intent of the Oregon Wildlife Planning Coordination project is to fund Oregon Department of Fish and Wildlife (ODFW) staff to facilitate wildlife mitigation coordination and planning between Oregon wildlife managers. The primary goal of ODFW wildlife mitigation planning/coordination staff is to foster, facilitate, and manage a statewide cooperative wildlife mitigation planning and implementation effort between the Oregon wildlife managers (the Oregon Wildlife Coalition or OWC) to mitigate for wildlife losses in Oregon caused by the development and operation of the hydropower system.

  2. Salt Repository Project: Waste Package Program (WPP) modeling activiteis: FY 1984 annual report

    SciTech Connect

    Kuhn, W.L.; Simonson, S.A.; Pulsipher, B.A.

    1987-03-01

    The Pacific Northwest Laboratory (PNL) is supporting the US Department of Energy's (DOE) Salt Repository Project (SRP) through its Waste Package Program (WPP). During FY 1984, the WPP continued its program of waste package component development and interactions testing and application of the resulting data base to develop predictive models describing waste package degradation and radionuclide release. Within the WPP, the Modeling Task (Task 04 during FY 1984) was conducted to interpret the tests in such a way that scientifically defensible models can be developed for use in qualification of the waste package.

  3. New Mexico State Annual Evaluation Report, Fiscal Year Ending June 30, 1970. P. L. 89-10, Title 1 ESEA Projects.

    ERIC Educational Resources Information Center

    Legant, Jean; Eakens, Doyle R.

    Contents of the New Mexico State Annual Evaluation Report for ESEA Title I Projects, for fiscal year ending June 30, 1970, include: New Mexico allocations for 1969-70; school districts allocations for 1969-70--basic statistics, state education agency staff visits to local education agencies, changes in the effect of state agency procedures, effect…

  4. Moses Lake Fishery Restoration Project; Factors Affecting the Recreational Fishery in Moses Lake Washington, Annual Report 2002-2003.

    SciTech Connect

    Burgess, Dave

    2003-11-01

    This annual report is a precursor to the final technical report we will be writing the next contract period. Consequently, this report, covering the period between September 27, 2002, and September 26, 2003, represents a progress report towards the final technical report we anticipate completing by September 26, 2004. Sample analysis and field work have progressed well and we anticipate no further delays. There are 4 objectives: (1) To quantify secondary production Moses Lake; (2) To quantify the influence of predation on target fishes in Moses Lake; (3) To quantify mortality of selected fished in Moses Lake; and (4) To assess effects of habitat changes from shoreline development and carp on the fish community in Moses Lake.

  5. New business opportunity: Green field project with new technology

    NASA Astrophysics Data System (ADS)

    Lee, Seung Jae; Woo, Jong Hun; Shin, Jong Gye

    2014-06-01

    Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.

  6. Report from the field: Overview of the Sixth Annual Vaccine Renaissance Conference.

    PubMed

    Spero, Denice; Levitz, Lauren; De Groot, Anne S

    2013-07-01

    The Sixth Annual Vaccine Renaissance Conference, hosted by the Institute for Immunology and Informatics (iCubed) at the University of Rhode Island (URI), took place on October 15-17, 2012. This conference provides a forum for the review of current progress in the discovery and development of vaccines, and creates an environment for the exchange of ideas. Dr. Joel McCleary opened the conference with a warning about the importance of preparing for well-defined biowarfare threats, including tularemia and Staphylococcal enterotoxin B. Following the keynote address, sessions explored biodefense and preparation for pandemic and biowarfare threats; vaccines for emerging and re-emerging neglected tropical diseases; animal vaccines and human health; and vaccine vectors and the human microbiome. In this issue of Human Vaccines and Immunotherapeutics, seven Vaccine Renaissance Conference speakers will showcase their work; here, we describe a few of the conference highlights.

  7. Report from the field: Overview of the Sixth Annual Vaccine Renaissance Conference.

    PubMed

    Spero, Denice; Levitz, Lauren; De Groot, Anne S

    2013-07-01

    The Sixth Annual Vaccine Renaissance Conference, hosted by the Institute for Immunology and Informatics (iCubed) at the University of Rhode Island (URI), took place on October 15-17, 2012. This conference provides a forum for the review of current progress in the discovery and development of vaccines, and creates an environment for the exchange of ideas. Dr. Joel McCleary opened the conference with a warning about the importance of preparing for well-defined biowarfare threats, including tularemia and Staphylococcal enterotoxin B. Following the keynote address, sessions explored biodefense and preparation for pandemic and biowarfare threats; vaccines for emerging and re-emerging neglected tropical diseases; animal vaccines and human health; and vaccine vectors and the human microbiome. In this issue of Human Vaccines and Immunotherapeutics, seven Vaccine Renaissance Conference speakers will showcase their work; here, we describe a few of the conference highlights. PMID:23732897

  8. Ural-Tweed Bighorn Sheep Wildlife Mitigation Project, 1986 Annual Report.

    SciTech Connect

    Yde, Chris A.; Summerfield, Bob; Young, Lewis

    1987-02-01

    This report summarizes the results of the project activities from September 1, 1984 to December 31, 1986. To date, habitat treatments have been initiated on eight areas. The treatments include selective slash and burn, prescribed fire and fertilization. Inclement weather precluded the completion of the prescribed burns scheduled during fall 1985 and fall 1986. The lower Stonehill prescribed fire was rescheduled from fall 1985 to spring 1986 with the burn accomplished, producing varied results. Extensive pretreatment vegetative information has been collected from all units scheduled for habitat manipulations. Additionally, future projects have been delineated for other areas frequented by bighorn sheep. Ten adult bighorn sheep (5 ewes and 5 rams) have been fitted with radio transmitters. Systematic aerial and ground surveys were utilized to monitor the movements and seasonal habitat preferences of the instrumented sheep. Age and sex information was gathered whenever possible to aid in the development of a population model, Monthly pallet group collections were initiated in May 1985 to provide samples for 2.6 diaminopimetic acid (DAPA), food habits and lungworm larvae analysis. The majority of the data analysis is ongoing and will be presented in later reports.

  9. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    SciTech Connect

    Johnson, R.; McKinstry, C.; Cook, C.

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville Tribal

  10. Integrating Field-Centered, Project Based Activities with Academic Year Coursework: A Curriculum Wide Approach

    NASA Astrophysics Data System (ADS)

    Kelso, P. R.; Brown, L. M.

    2015-12-01

    Based upon constructivist principles and the recognition that many students are motivated by hands-on activities and field experiences, we designed a new undergraduate curriculum at Lake Superior State University. One of our major goals was to develop stand-alone field projects in most of the academic year courses. Examples of courses impacted include structural geology, geophysics, and geotectonics, Students learn geophysical concepts in the context of near surface field-based geophysical studies while students in structural geology learn about structural processes through outcrop study of fractures, folds and faults. In geotectonics students learn about collisional and rifting processes through on-site field studies of specific geologic provinces. Another goal was to integrate data and samples collected by students in our sophomore level introductory field course along with stand-alone field projects in our clastic systems and sequence stratigraphy courses. Our emphasis on active learning helps students develop a meaningful geoscience knowledge base and complex reasoning skills in authentic contexts. We simulate the activities of practicing geoscientists by engaging students in all aspects of a project, for example: field-oriented project planning and design; acquiring, analyzing, and interpreting data; incorporating supplemental material and background data; and preparing oral and written project reports. We find through anecdotal evidence including student comments and personal observation that the projects stimulate interest, provide motivation for learning new concepts, integrate skill and concept acquisition vertically through the curriculum, apply concepts from multiple geoscience subdisiplines, and develop soft skills such as team work, problem solving, critical thinking and communication skills. Through this projected-centered Lake Superior State University geology curriculum students practice our motto of "learn geology by doing geology."

  11. A novel condenser for EUV lithography ring-field projection optics

    SciTech Connect

    Chapman, H; Nugent, K A

    1999-07-15

    A condenser for a ring-field extreme ultra-violet (EUV) projection lithography camera is presented. The condenser consists of a gently undulating mirror, that we refer to as a ripple plate, and which is illuminated by a collimated beam at grazing incidence. The light is incident along the ripples rather than across them, so that the incident beam is reflected onto a cone and subsequently focused on to the arc of the ring field. A quasistationary illumination is achieved, since any one field point receives light from points on the ripples, which are distributed throughout the condenser pupil. The design concept can easily be applied to illuminate projection cameras with various ring-field and numerical aperture specifications. Ray-tracing results are presented of a condenser for a 0.25 NA EUV projection camera.

  12. Tactical nuclear weapons responsibility: Ordnance versus field artillery. Study project

    SciTech Connect

    Fields, J.A.

    1990-03-08

    There has existed and still exists an operational dichotomy in the area of the provision of tactical nuclear weapons to United States Army forces versus those allied forces in a combined theater of operations. Specifically, within the NATO environment and to a very small degree within Combined Forces Korea, there exists a condition where tactical nuclear weapons are supplied to the U.S. firing unit by an organization under the proponency of the Ordnance Corps. On the other hand, within the same theater, the non-U.S. force receives their tactical nuclear weapons by an organization under the proponency of the Field Artillery. This paper will examine the functions performed by this duplication of supply organizations and briefly list the supporting structure. It will then explore any possible purpose for the duplication which would justify this apparent mission replication. Discussion will then follow which will list the pros and cons of staying with the status quo or the possible assignment of the supply function to a single branch proponency. Conclusions are then drawn and recommendations made for improving the current system of tactical nuclear weapon support.

  13. Fall Chinook Aclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2001.

    SciTech Connect

    McLeod, Bruce

    2004-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, and will ultimately work towards achieving

  14. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.

    SciTech Connect

    McLeod, Bruce

    2004-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, were located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, was located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  15. Yakima/Klickitat Fisheries Project; Klickitat Only Monitoring and Evaluation, 2002-2003 Annual Report.

    SciTech Connect

    Sampson, Melvin; Evenson, Rolf

    2003-12-01

    The monitoring and evaluation activities described in this report were determined by consensus of the scientists from the Yakama Nation (YN). Klickitat Subbasin Monitoring and Evaluation (M&E) activities have been subjected to scientific and technical review by members of YKFP's Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP project biologists have transformed the conceptual design into the tasks described. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - Accurately characterize baseline available habitat and salmonid populations pre-habitat restoration and pre-supplementation. (2) EDT Modeling - Identify and evaluate habitat and artificial production enhancement options. (3) Genetics - Characterize the genetic profile of wild steelhead in the Klickitat Basin. (4) Ecological Interactions - Determine the presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information.

  16. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    SciTech Connect

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A.

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  17. DOE Project on Heavy Vehicle Aerodynamic Drag FY 2005 Annual Report

    SciTech Connect

    McCallen, R C; Salari, K; Ortega, J; Castellucci, P; Eastwood, C; Paschkewitz, J; Pointer, W D; DeChant, L J; Hassan, B; Browand, F; Radovich, C; Merzel, T; Plocher, D; Ross, J; Storms, B; Heineck, J T; Walker, S; Roy, C J

    2005-11-14

    Class 8 tractor-trailers consume 11-12% of the total US petroleum use. At high way speeds, 65% of the energy expenditure for a Class 8 truck is in overcoming aerodynamic drag. The project objective is to improve fuel economy of Class 8 tractor-trailers by providing guidance on methods of reducing drag by at least 25%. A 25% reduction in drag would present a 12% improvement in fuel economy at highway speeds, equivalent to about 130 midsize tanker ships per year. Specific goals include: (1) Provide guidance to industry in the reduction of aerodynamic drag of heavy truck vehicles; and (2) Establish a database of experimental, computational, and conceptual design information, and demonstrate the potential of new drag-reduction devices.

  18. Annual Technical Status Report of the Regulatory Assistance Project: September 2000--September 2001

    SciTech Connect

    Not Available

    2002-10-01

    This report summarizes the work in 2001 by the Regulatory Assistance Project (RAP), under contract to the National Renewable Energy Laboratory. This work focused on identifying and removing the regulatory and institutional barriers that keep the full economic value of distributed resources from being realized. The following five reports present the work details: (1) Accommodating Distributed Resources in Wholesale Markets, NREL/SR-560-32497; (2) Distributed Resource Distribution Credit Pilot Programs - Revealing the Value to Consumers and Vendors, NREL/SR-560-32499; (3) Distributed Resources and Electric System Reliability, NREL/SR-560-32498; (4) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (5) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR. Visit www.eren.doe.gov/distributedpower for more information about RAP contract activity to establish environmental output air emissions standards for small-scale electricity generation (to be published as a future NREL subcontract report).

  19. Hybrid vehicle turbine engine technology support (HVTE-TS) project. 1995--1996 annual report

    SciTech Connect

    1996-12-31

    This report presents a summary of technical work accomplished on the Hybrid Vehicle Turbine Engine--Technology Support (HVTE-TS) Project during calendar years 1995 and 1996. Work was performed under an initial National Aeronautics and Space Administration (NASA) contract DEN3-336. As of September 1996 the contract administration was transferred to the US Department of Energy (DoE) Chicago Operations Office, and renumbered as DE-AC02-96EE50553. The purpose of the HVTE-TS program is to develop gas turbine engine technology in support of DoE and automotive industry programs exploring the use of gas turbine generator sets in hybrid-electric automotive propulsion systems. The program focus is directed to the development of four key technologies to be applied to advanced turbogenerators for hybrid vehicles: Structural ceramic materials and processes; Low emissions combustion systems; Regenerators and seals systems; and Insulation systems and processes. 60 figs., 9 tabs.

  20. Enhanced flame stability and soot radiation using electric fields. Annual report, July 1987-July 1988

    SciTech Connect

    Berman, C.H.; Gill, R.J.; Calcote, H.F.

    1988-10-01

    Enhanced stabilization of methane-air flames was achieved by application of dc electric fields of only a few thousand volts with a minimum electric-power dissipation, about 0.01% of the combustion power being controlled. Both the lean blowoff composition and the maximum blowoff velocity are markedly affected. The mechanism for this phenomenon is discussed in terms of an effect of the electric field on the boundary velocity gradient. The electric field applies an electric force on the chemiions in the flame, producing an electric wind which forces the flame closer to the burner rim both reducing the dead space and decreasing the boundary velocity gradient. The 'boiling' effect on a flat flame due to the application of an electric field, reported previously, is explained by an electron-cascade effect in which thermally produced electrons are accelerated by the electric field producing more charged soot particles. In a counterflow flame, periodic waves are produced by the electric field; an explanation has not been developed. The counterflow and flat flame apparatus, including the laser optical system for particle measurements in the flame has been completely redesigned for more rapid and especially more accurate data collection.

  1. Yakima/Klickitat Fisheries Project: Management, Data and Habitat, Annual Report 2001-2002.

    SciTech Connect

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring & Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  2. Yakima/Klickitat Fisheries Project : Management, Data and Habitat, Annual Report 2002-2003.

    SciTech Connect

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring and Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  3. 30 CFR 203.67 - What economic criteria must I meet to get royalty relief on an authorized field or project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Expansion Projects § 203.67 What economic criteria must I meet to get royalty relief on an... the field, development project, or expansion project economically viable. Your field or project...

  4. NIOSH grants research and demonstration projects. Annual report, Fiscal Year 1990

    SciTech Connect

    Not Available

    1991-04-01

    The report is designed to stimulate submission of proposals for research of high quality on significant problems of occupational safety and health. The report contains information on studies currently underway or recently completed in the field. The topics of concern includes occupational lung diseases (epithelial surface proteins, environmental toxicity of isocyanates, chemical poisoning, influence of particles on lung disease); musculoskeletal injuries (model studies, ergonomics, quantitative measures of skeletal movements, biomechanics, carpal tunnel syndrome, vibration effects); occupational cancers; traumatic injuries; cardiovascular diseases; disorders of reproduction; neurotoxic disorders; noise induced hearing loss; dermatologic conditions; psychological disorders; control techniques; respirator research; and other occupational needs.

  5. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2011

    SciTech Connect

    David W. Nigg; Devin A. Steuhm

    2011-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance and, to some extent, experiment management are obsolete, inconsistent with the state of modern nuclear engineering practice, and are becoming increasingly difficult to properly verify and validate (V&V). Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In 2009 the Idaho National Laboratory (INL) initiated a focused effort to address this situation through the introduction of modern high-fidelity computational software and protocols, with appropriate V&V, within the next 3-4 years via the ATR Core Modeling and Simulation and V&V Update (or 'Core Modeling Update') Project. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF). The ATR Core Modeling Update Project, targeted for full implementation in phase with the anticipated ATR Core Internals Changeout (CIC) in the 2014 time frame, began during the last quarter of Fiscal Year 2009, and has just completed its first full year. Key accomplishments so far have encompassed both computational as well as experimental work. A new suite of stochastic and deterministic transport theory based reactor physics codes and their supporting nuclear data libraries (SCALE, KENO-6, HELIOS, NEWT, and ATTILA) have been installed at the INL under various permanent sitewide license agreements and corresponding baseline models of the ATR and ATRC are now operational, demonstrating the basic feasibility of these code packages for their intended purpose. Furthermore, a

  6. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.

    SciTech Connect

    McLeod, Bruce

    2003-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  7. Subseabed disposal project annual reports: environmental studies, October 1981-September 1983

    SciTech Connect

    Gomez, L.S.; Kupferman, S.L.; Marietta, M.G.

    1986-05-01

    The goal of the Environmental Studies Program is to be able to make reliable predictions of the radionuclide concentrations in marine biota that are potentially important for critical pathways to humans, collective population doses, and doses to selected marine organisms. Achieving this goal requires reliable modeling of the physical dispersion process, including geochemical and biological mediation, and overlaying the biological pathways to biota and humans on the resulting radionuclide concentration fields. The models that are being used simulate the actual oceanic field using site-specific data locally. With them, dispersion from an ocean-bottom source can be described from boundary-layer scales to world ocean scales. The overall veracity of the results has yet to be demonstrated since the models are still in the developmental stage. For example, the effects of very steep, large-relief topography such as seamounts cannot currently be modeled. In addition, the range of physical parameters that can be used in the REM barely includes the most energetic regions of the western boundary currents. Also, no coastal shelf models are available to describe coastal/interior exchange, and no operational model of the Antarctic Circumpolar Current exists to describe the mass exchange between oceans, antarctic upwelling, and/or deep water formation. However, incorporation of these features is planned.

  8. Evaluation of area of review variance opportunities for the East Texas field. Annual report

    SciTech Connect

    Warner, D.L.; Koederitz, L.F.; Laudon, R.C.; Dunn-Norman, S.

    1995-05-01

    The East Texas oil field, discovered in 1930 and located principally in Gregg and Rusk Counties, is the largest oil field in the conterminous United States. Nearly 33,000 wells are known to have been drilled in the field. The field has been undergoing water injection for pressure maintenance since 1938. As of today, 104 Class II salt-water disposal wells, operated by the East Texas Salt Water Disposal Company, are returning all produced water to the Woodbine producing reservoir. About 69 of the presently existing wells have not been subjected to U.S. Environmental Protection Agency Area-of-Review (AOR) requirements. A study has been carried out of opportunities for variance from AORs for these existing wells and for new wells that will be constructed in the future. The study has been based upon a variance methodology developed at the University of Missouri-Rolla under sponsorship of the American Petroleum Institute and in coordination with the Ground Water Protection Council. The principal technical objective of the study was to determine if reservoir pressure in the Woodbine producing reservoir is sufficiently low so that flow of salt-water from the Woodbine into the Carrizo-Wilcox ground water aquifer is precluded. The study has shown that the Woodbine reservoir is currently underpressured relative to the Carrizo-Wilcox and will remain so over the next 20 years. This information provides a logical basis for a variance for the field from performing AORs.

  9. Field studies on the annual activity and the metabolic responses of a land snail population living in high altitude.

    PubMed

    Staikou, Alexandra; Tachtatzis, George; Feidantsis, Konstantinos; Michaelidis, Basile

    2016-01-01

    In the context of the metabolic cold adaptation hypothesis (MCA), we investigated a) the life and activity cycle characteristics and b) the metabolic responses of the endemic land snail species Cattania trizona olympica living at 1100m altitude in Olympus mountain (Greece). Field observations on the annual activity cycle of C. trizona olympica revealed that snails' activity was restricted mainly between the end of May and September, when the higher temperatures were recorded, while first matings were recorded in July and the last ones in mid September indicating a restricted favorable time period for reproduction. The activities of enzymes of intermediate metabolism showed a periodic seasonal pattern of change which seems to be closely related to the pattern of annual changes of air temperature and most of them exhibited higher activities during the coldest and warmest periods of the year. Moreover the data indicate a distinct differentiation of fuel oxidation during arousal and reproductive periods with lipid oxidation, apart from carbohydrates, contributing significantly to ATP turnover during reproductive activity. The higher enzymatic activities, determined in the tissues of C. trizona olympica than the corresponding ones determined in the tissues of the land snail species living at low altitudes, might indicate higher sensitivity of the intermediate metabolism and ATP turnover in C. trizona olympica to changes in environmental factors. Although the latter seems to be in line with the MCA hypothesis, it needs further investigation on metabolic rates to support it. PMID:26408810

  10. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.

  11. DOE project review Massachusetts Photovoltaic Program. Annual report, June 1989--July 1990

    SciTech Connect

    1996-06-01

    This is the third year of operations for work under the Cooperative Agreement between the Commonwealth of Massachusetts Photovoltaic Center and the U.S. Department of Energy. As a collaborative effort with shared resources, the activity at the Photovoltaic Center and the University of Lowell Photovoltaic Program has continued to advance the utilization and implementation of photovoltaic-powered systems into society. The programs and activities developed over the past three years have supported strategies that cover both international utilization as well as domestic application. Three major areas of activities have centered around the following themes: (1) The identification of market opportunities to enlarge sales potential for the photovoltaic industry. (2) The development of a knowledgeable infrastructure to support PV diffusion in Massachusetts, in the United States, and around the world. (3) The analysis of the physical, economic, and regulatory environment in which PV must compete with mature energy technologies. This past year has been an experience of contrasts for the Photovoltaic Center. Projects and activities have resulted in the successful completion of programs goals.

  12. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2013

    SciTech Connect

    David W. Nigg

    2013-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance, and to some extent, experiment management, are inconsistent with the state of modern nuclear engineering practice, and are difficult, if not impossible, to verify and validate (V&V) according to modern standards. Furthermore, the legacy staff knowledge required for effective application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In late 2009, the Idaho National Laboratory (INL) initiated a focused effort, the ATR Core Modeling Update Project, to address this situation through the introduction of modern high-fidelity computational software and protocols. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF).

  13. Umatilla River Basin, Anadromous Fish Habitat Enhancement Project : Annual Report 1989.

    SciTech Connect

    Scheeler, Carl A.

    1990-03-01

    The Umatilla habitat improvement program targets the improvement of water quality and the restoration of riparian areas, spawning and rearing habitat of steelhead, spring and fall chinook and coho salmon. The channelization of Meacham Creek by the Union Pacific Railroad combined with poor riparian livestock management created extreme channel instability and bedload movement within the project area. The resulting loss of riparian vegetation caused an increase in water temperatures, evaporative losses and sediment loading from upland sites. Four leases and nine right-of-way agreements were procured for the restoration of 2 miles of stream channel on Meacham Creek and lower Boston Canyon Creek. Treatments included: sloping of gravel deposits to reduce channel braiding and develop a more stable channel configuration, placement of rock and wood structures to reduce erosion of stream banks and encourage the deposition of fines for the establishment of riparian vegetation, placement of instream boulders, weirs and large organic debris to increase holding and hiding cover and to encourage the development of a stable thalweg, and the enhancement of riparian vegetation through planting of hardwood cuttings and grass and forb seeds. Baseline data on stream flows, water temperature and suspended sediments, and channel morphology was collected.

  14. ENCOAL Mild Coal Gasification Demonstration Project. Annual report, October 1993--September 1994

    SciTech Connect

    1995-03-01

    ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining Company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The LFC technology uses a mild pyrolysis or mild gasification process which involves heating the coal under carefully controlled conditions. The process causes chemical changes in the feed coal in contrast to conventional drying, which leads only to physical changes. Wet subbituminous coal contains considerable water, and conventional drying processes physically remove some of this moisture, causing the heating value to increase. The deeper the coal is physically dried, the higher the heating value and the more the pore structure permanently collapses, preventing resorption of moisture. However, deeply dried Powder River Basin coals exhibit significant stability problems when dried by conventional thermal processes. The LFC process overcomes these stability problems by thermally altering the solid to create PDF and CDL. Several of the major objectives of the ENCOAL Project have now been achieved. The LFC Technology has been essentially demonstrated. Significant quantities of specification CDL have been produced from Buckskin coal. Plant operation in a production mode with respectable availability (approaching 90%) has been demonstrated.

  15. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2010

    SciTech Connect

    Rahmat Aryaeinejad; Douglas S. Crawford; Mark D. DeHart; George W. Griffith; D. Scott Lucas; Joseph W. Nielsen; David W. Nigg; James R. Parry; Jorge Navarro

    2010-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance and, to some extent, experiment management are obsolete, inconsistent with the state of modern nuclear engineering practice, and are becoming increasingly difficult to properly verify and validate (V&V). Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In 2009 the Idaho National Laboratory (INL) initiated a focused effort to address this situation through the introduction of modern high-fidelity computational software and protocols, with appropriate V&V, within the next 3-4 years via the ATR Core Modeling and Simulation and V&V Update (or “Core Modeling Update”) Project. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF).

  16. NREL Solar Radiation Resource Assessment Project: Status and outlook. FY 1991 annual progress report

    SciTech Connect

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL`s Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961--1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities have been measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93% of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952--1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU`s), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL`s Solar Radiation Research Laboratory. 17 refs.

  17. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    SciTech Connect

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  18. Curriculum Outline for a General Oceanography Field Laboratory (Review Cycle-Annual).

    ERIC Educational Resources Information Center

    Schlenker, Richard M.

    A curriculum guide, in outline form, for oceanography field laboratories is presented. Designed to complement and expand upon an oceanography lecture course, it provides a list of objectives related to student experiences in three areas: (1) operating oceanographic equipment; (2) gathering, manipulating, and evaluating data; and (3) writing formal…

  19. Model parameter uncertainty analysis for an annual field-scale phosphorus loss model

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Phosphorous (P) loss models are important tools for developing and evaluating conservation practices aimed at reducing P losses from agricultural fields. All P loss models, however, have an inherent amount of uncertainty associated with them. In this study, we conducted an uncertainty analysis with ...

  20. Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.

    SciTech Connect

    Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

    2008-12-17

    Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and

  1. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2012

    SciTech Connect

    David W. Nigg, Principal Investigator; Kevin A. Steuhm, Project Manager

    2012-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance, and to some extent, experiment management, are inconsistent with the state of modern nuclear engineering practice, and are difficult, if not impossible, to properly verify and validate (V&V) according to modern standards. Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In late 2009, the Idaho National Laboratory (INL) initiated a focused effort, the ATR Core Modeling Update Project, to address this situation through the introduction of modern high-fidelity computational software and protocols. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF). The ATR Core Modeling Update Project, targeted for full implementation in phase with the next anticipated ATR Core Internals Changeout (CIC) in the 2014-2015 time frame, began during the last quarter of Fiscal Year 2009, and has just completed its third full year. Key accomplishments so far have encompassed both computational as well as experimental work. A new suite of stochastic and deterministic transport theory based reactor physics codes and their supporting nuclear data libraries (HELIOS, KENO6/SCALE, NEWT/SCALE, ATTILA, and an extended implementation of MCNP5) has been installed at the INL under various licensing arrangements. Corresponding models of the ATR and ATRC are now operational with all five codes, demonstrating the basic feasibility of the new code packages for their intended purpose. Of particular importance, a set of as-run core

  2. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Annual Report 2001.

    SciTech Connect

    Sampson, Melvin R.

    2002-12-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  3. York County Energy Partners CFB Cogeneration Project. Annual report, [September 30, 1992--September 30, 1993

    SciTech Connect

    Not Available

    1994-03-01

    The Department of Energy, under the Clean Coal Technology program, proposes to provide cost-shared financial assistance for the construction of a utility-scale circulating fluidized bed technology cogeneration facility by York County Energy Partners, L.P (YCEP). YCEP, a project company of ir Products and Chemicals, Inc., would design, construct and operate a 250 megawatt (gross) coal-fired cogeneration facility on a 38-acre parcel in North Codorus Township, York County, Pennsylvania. The facility would be located adjacent to the P. H. Glatfelter Company paper mill, the proposed steam host. Electricity would be delivered to Metropolitan Edison Company. The facility would demonstrate new technology designed to greatly increase energy efficiency and reduce air pollutant emissions over current generally available commercial technology which utilizes coal fuel. The facility would include a single train circulating fluidized bed boiler, a pollution control train consisting of limestone injection for reducing emissions of sulfur dioxide by greater than 92 percent, selective non-catalytic reduction for reducing emissions of nitrogen oxides, and a fabric filter (baghouse) for reducing emissions of particulates. Section II of this report provides a general description of the facility. Section III describes the site specifics associated with the facility when it was proposed to be located in West Manchester Township. After the Cooperative Agreement was signed, YCEP decided to move the proposed site to North Codorus Township. The reasons for the move and the site specifics of that site are detailed in Section IV. This section of the report also provides detailed descriptions of several key pieces of equipment. The circulating fluidized bed boiler (CFB), its design scale-up and testing is given particular emphasis.

  4. 28. annual offshore technology conference: Proceedings. Volume 4: Field drilling and development systems

    SciTech Connect

    1996-12-31

    The 88 papers in this volume cover the following topics: Small operator implementation of subsea technology; Control system umbilicals, components and ROV interfacing; DeepStar--Results and plans; Deepwater subsea manifold systems; Drilling technology; Limit state design criteria for pipelines; Liuhua project; Mobile offshore drilling units; Offshore coiled tubing operations; Oman-India gas pipeline; Paraffin and hydrate control; Pompano--A deepwater subsea development; Severe operating conditions; Subsea production systems; and Well completions technology. Papers have been processed separately for inclusion on the data base.

  5. Observation of magnetic field-induced contraction of fission yeast cells using optical projection microscopy

    NASA Astrophysics Data System (ADS)

    Yang, Xi; Beckwith, A. W.

    2005-03-01

    The charges in live cells interact with or produce electric fields, which results in enormous dielectric responses, flexoelectricity, and related phenomena. Here we report on a contraction of Schizosaccharomyces pombe (fission yeast) cells induced by magnetic fields, as observed using a phase-sensitive projection imaging technique. Unlike electric fields, magnetic fields only act on moving charges. The observed behavior is therefore quite remarkable, and may result from a contractile Lorentz force acting on diamagnetic screening currents. This would indicate extremely high intracellular charge mobilities. Besides, we observed a large electro-optic response from fission yeast cells.

  6. Observation of magnetic field-induced contraction of fission yeast cells using optical projection microscopy

    NASA Astrophysics Data System (ADS)

    Yang, Xi; Beckwith, Andrew; Miller, John; Wood, Lowell

    2004-12-01

    The charges in live cells interact with or produce electric fields, which results in enormous dielectric responses, flexoelectricity, and related phenomena. Here we report on a contraction of Schizosaccharomyces pombe (fission yeast) cells induced by magnetic fields, as observed using a phase-sensitive projection imaging technique. Unlike electric fields, magnetic fields only act on moving charges. The observed behavior is therefore quite remarkable, and may result from a contractile Lorentz force acting on diamagnetic screening currents. This would indicate extremely high intracellular charge mobilities. Besides, we observed a large electro-optic response from fission yeast cells.

  7. Using Theory of Learning and Awareness to Bring about Learning through a School-Based Environmental Field Project

    ERIC Educational Resources Information Center

    Kwan, Tammy; Chan, Eva

    2004-01-01

    A school-based environmental field project "What Happens Around You and Your School Area?" was designed under the School-based Curriculum Project Scheme (2001-2002) supported by the Hong Kong Education Manpower Bureau (formerly the Education Department). This school-based environmental field project, with heavy inclusion of environmental elements,…

  8. Nye County nuclear waste repository project office independent scientific investigations program. Summary annual report, May 1996--April 1997

    SciTech Connect

    1997-05-01

    This annual summary report, prepared by Multimedia Environmental Technology, Inc. (MET) on behalf of Nye County Nuclear Waste Project Office, summarizes the activities that were performed during the period from May 1, 1996 to April 30, 1997. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: (1) Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment. (2) Identifying areas not being addressed adequately by DOE Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues.

  9. Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997--April 1998

    SciTech Connect

    1998-07-01

    This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County.

  10. Cellular response to exogenous electromagnetic fields. Annual report, October 1986-September 1987

    SciTech Connect

    Goodman, R.; Henderson, A.S.

    1987-09-21

    This research has determined that extremely-low-frequency (ELF) (100-Hz) electromagnetic (EM) fields induce alterations in transcription and translation in dipteran (Drosophila, Sciara) and human (HL60, IB4) cells. Transcriptional autoradiography and endoreplicated chromosomes, as well as analyses of sucrose density-gradient profiles, shows increased uptake of /sup 3/H uridine into RNA following exposure of cells to sinusoidal and asymmetric quasi-rectangular signals for time periods up to 60 minutes. Biochemical analyses (sucrose density gradients, oligo (d) T columns) have demonstrated that the RNA affected by signal stimulation is in the messenger-RNA size class. Quantitative and qualitative alterations also occur in polypeptide synthesis following EM-field stimulation. Major differences are noted from control among all sets analyzed with respect to new and augmented, as well as suppressed and deleted polypeptides. Using hybridization analysis, there is preliminary evidence that cell-specific transcripts are augmented.

  11. Final Report on the Airborne Field Mill Project (ABFM) 2000-2001 Field Campaign

    NASA Technical Reports Server (NTRS)

    Dye, James E.; Lewis, Sharon; Bateman, Monte, G.; Mach, Douglas M.; Merceret, Francis J.; Ward, Jennifer G.; Grainger, Cedric A.

    2004-01-01

    The Airborne Field Mill (ABFM) research program conducted under the direction of the John F. Kennedy Space Center during 2000 and 2001 is described. The purpose, methodology and initial results from the program are presented. Extensive appendices detailing the instrumentation used to collect the data are provided.

  12. Snake River Sockeye Salmon Captive Broodstock Program, Research Element : Project Progress Report, 2000 Annual Report.

    SciTech Connect

    Hebdon, J. Lance; Castillo, Jason; Kline, Paul A.

    2002-08-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes and Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. Restoration efforts are focusing on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced juvenile sockeye salmon from the captive broodstock program occurred in 1994. The first anadromous adult returns from the captive broodstock program were recorded in 1999 when six jacks and one jill were captured at Idaho Department of Fish and Game's Sawtooth Fish Hatchery. In 2000, progeny from the captive broodstock program were released using four strategies: eyed-eggs were placed in Pettit Lake; age-0 presmolts were released to all three lakes in October; age-1 smolts were released to Redfish Lake Creek, and hatchery-produced adult sockeye salmon were released to Redfish and Alturas lakes for volitional spawning in September. Anadromous adult sockeye salmon were released to all three lakes. Total kokanee abundance in Redfish Lake was estimated at 10,268, which was the lowest abundance since 1991. Abundance of kokanee in Alturas Lake was estimated at 125,462, which was one of the highest values recorded since 1991. Abundance of kokanee in Pettit Lake was estimated at 40,599, which is the third highest value recorded since 1991. Upon the recommendation of the Stanley Basin Sockeye Technical Oversight Committee, the National Marine Fisheries Service reopened the kokanee fishery on Redfish Lake in 1995 in an attempt to reduce kokanee numbers. Anglers fished an estimated 3,063 hours and harvested approximately 67 kokanee during the 2000 season. Angler effort and harvest were also monitored on Alturas Lake during 2000. Effort on Alturas Lake was 5,190 hours, and harvest of kokanee

  13. Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

    SciTech Connect

    Howell, Matthew D.; McLellan, Jason G.

    2009-07-15

    motivated movements. In August 2003, three Vemco VR2 fixed station acoustic receivers, supplied by the UCWSRI Transboundary Telemetry Project, were deployed in the vicinities of Kettle Falls Bridge, Marcus Island, and Northport, WA. Data downloaded from these receivers through December 2003 confirmed the findings of a previous telemetry study that the Marcus area is an important overwintering habitat for white sturgeon. On 18 February 2004, juvenile white sturgeon (n=2,000) were transported from Kootenay Sturgeon Hatchery in British Columbia to WDFW Columbia Basin Hatchery (CBH) in Moses Lake, WA. Fish were reared at CBH to approximately 30 g and individually outfitted with PIT tags and scute marked. On 11 May 2004, fish were released into Lake Roosevelt in the vicinities of Kettle Falls Bridge, North Gorge, and Northport.

  14. Microbial enhanced waterflooding pilot project, Mink Unit, Delaware-Childers (OK) field

    SciTech Connect

    Bryant, R.S.; Burchfield, T.E.; Dennis, D.M.; Hitzman, D.O.

    1991-08-01

    The first microbial-enhanced waterflood field project was initiated in October of 1986. The site selected for the project is in the Mink Unit of Delaware-Childers field in Nowata County, Oklahoma. The pilot area consists of four adjacent inverted five-spot patterns drilled on 5-acre spacing. There are 21 injection and 15 production wells on this pilot. Four of the 21 injection wells were treated with microbial formulation. Laboratory screening criteria were developed to evaluate microorganisms for this project. Several different microbial formulations were tested. Injectivity and microbial field survivability tests were conducted during the baseline period on two off-pattern wells, and a chemical tracer, fluorescein, was injected into the four injection wells during the baseline period. Methodologies for field applications of microorganisms in ongoing waterfloods were developed as a result of this project. Results from the field pilot showed that microorganisms could be injected into an ongoing waterflood without causing any problems in injectivity. Microbial treatment did improve oil production rate, and water/oil ratios for producing wells nearest the microbially treated injection wells continue to be more favorable than baseline values. 23 refs., 30 figs., 28 tabs.

  15. Projection of phase singularities in moiré fringe onto a light field

    NASA Astrophysics Data System (ADS)

    Ohno, Seigo

    2016-06-01

    A moiré pattern, which is a kind of spatial interference between two periodic patterns, is regarded as a spatial modulation of a "field." By defining the displacement field, we reveal that moiré patterns can have a topological phase singularity, similar to a disclination in liquid crystal and, more generally, a vector field treated in the singular optics. We propose that topological singularities in the moiré displacement field can be projected by passing an electromagnetic field through a metasurface. We designed a metasurface constructed from two layers of a metal disk array operating in the terahertz band; then we numerically estimated the spatial distribution of its transmission properties. The phase singularities in the electromagnetic fields coincided with the singularities appearing in the moiré pattern. We found two kinds of singularities, and the phase of the electromagnetic field changed by 2π or 4π around them. These phase changes were independent of the light frequency, implying that the topological properties of the moiré fields were projected onto the electromagnetic field. This feature of moiré metasurfaces can potentially be exploited in spiral phase plate arrays with no frequency dispersion of the phase change.

  16. 30 CFR 203.64 - How many applications may I file on a field or a development project?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Development and Expansion Projects § 203.64 How many applications may I file on a field or a development... development project or an expansion project designed to produce a reservoir or set of reservoirs. However, you...; (b) You apply for royalty relief for an expansion project; (c) You withdraw the application before...

  17. Field Techniques: Atlantic Barrier System. Field Guidebook. National Association of Geology Teachers Eastern Section Annual Field Conference (Lewes, Delaware, April 26-29, 1984).

    ERIC Educational Resources Information Center

    O'Connor, James V., Ed.; Tormey, Brian B., Ed.

    The Atlantic barrier system is used as a focal point in this manual of field exercises. A collection of activities and posed questions provide students with opportunities to develop skills basic to the development of sound field techniques. Investigations can be adapted and modified by teachers to specific subject areas and developmental needs.…

  18. On-site fuel cell field test support program. Annual report Jul 81-Jun 82

    SciTech Connect

    Staniunas, J.W.; Merten, G.P.

    1982-09-01

    United continued this past year to assist the utilities and the Gas Research Institute in the review and selection of sites for data monitoring. Each of these sites will be instrumented and its energy requirements monitored and analyzed for one year prior to the selection of 40 Kilowatt fuel cell field test sites. Analyses in support of the selection of sites for instrumentation continued to show that many building sectors offered considerable market potential. These sectors include nursing home, health club, restaurant, industrial, hotel/motel and apartment.

  19. Laboratory and field studies related to the Hydrology/Radionuclide Migration Project

    SciTech Connect

    Thompson, J.L.

    1991-05-01

    This annual report describes research conducted in FY 1990 by Los Alamos National Laboratory for the Hydrology/Radionuclide Migration Project. This multi-agency project measures the underground movement of radionuclides related to nuclear testing at the Nevada Test Site. This project continues the long-term experiment at the site of the Cambric nuclear test. Water pumped from a well adjacent to the explosion cavity continues to show decreasing amounts of tritium and Krypton 85 but no Cesium 139. Analyses of drillback debris shows a distinction between refractory and volatile materials in respect to both their location in the test cavity and their leachability with groundwater. We surveyed materials used during nuclear testing to evaluate any post-test hazard; we concluded that most such materials pose a minimal hazard. The Los Alamos drilling program provided an opportunity for us to sample a collapsed zone above the cavity of a test, which was fired 2 years ago. We continue our research in colloid characterization and in detection of low levels of Technetium 99 in Nevada Test Site water. During FY 1990, we drilled a new hole in the Yucca Flat area to study radionuclide migration. This report also describes Los Alamos management and planning activities in support of this project. 20 refs., 2 figs., 14 tabs.

  20. Development of algorithms for capacitance imaging techniques for fluidized bed flow fields. 1990 Annual report

    SciTech Connect

    Loudin, W.J.

    1991-01-01

    The objective of this research is to provide support for the instrumentation concept of a High Resolution Capacitance Imaging System (HRCIS). The work involves the development and evaluation of the mathematical theory and associated models and algorithms which reduce the electronic measurements to valid physical characterizations. The research and development require the investigation of techniques to solve large systems of equations based on capacitance measurements for various electrode configurations in order to estimate densities of materials in a cross-section of a fluidized bed. Capacitance measurements are made for 400 connections of the 32-electrode system; 400 corresponding electric-field curves are constructed by solving a second order partial differential equation. These curves are used to partition the circular disk into 193 regions called pixels, and the density of material in each pixel is to be estimated. Two methods of approximating densities have been developed and consideration of a third method has been initiated. One method (Method 1) is based on products of displacement currents for intersecting electric-field curves on a cross section. For each pixel one point of intersection is chosen, and the product of the capacitance measurements is found. Both the product and the square-root-of-product seem to yield good relative distribution of densities.

  1. Electric fields in earth orbital space. Annual report, September 1985-October 1986

    SciTech Connect

    Olson, W.P.; Pfitzer, K.A.

    1986-10-30

    A model of the ground-state magnetosphere was developed that suggested that the basic magnetosphere is formed and maintained simply by the interaction of the solar wind with the geomagnetic field. It is known, however, that the magnetosphere responds dynamically to changes in the interplanetary magnetic field (IMF). Instead of the qualitative reconnection theory, this response is examined in terms of electromagnetic wave propagation in the interplanetary region. The interplanetary plasma (solar wind) is magnetized there by the solar magnetic sector structure. Electromagnetic waves of higher frequency can propagate through the solar wind without appreciable attenuation. It is the interaction of these disturbance waves with the magnetosphere that causes the observed magnetospheric response to the IMF. The propagation of electromagnetic disturbances in the interplantary region and their interaction with the magnetosphere is examined quantitatively. Only certain modes propagate and there are further restrictions on the waves at the waves at the magnetopause. A southward IMF produces the most dramatic magnetospheric response in the tail region and a northward IMF in the polar cusp region.

  2. Thermal Energy Storage Evaluation Program: 1986 annual report. [Economic planning, technical assessment, field tests

    SciTech Connect

    Drost, M.K.; Bates, J.M.; Brown, D.R.; Weijo, R.O.

    1987-07-01

    The Thermal Energy Storage Evaluation Program activities were initiated to provide economic planning, technical assessment and field testing support for the thermal energy storage program, as well as management of the overall program for the DOE. Economic planning included two assessment studies. In technical assessment, issues that might affect an assessment were outlined for the development of a standard methodology to conduct assessments; work is underway to establish ''market-based'' cost and performance goals for cool storage technologies in residential applications; planning has begun for investigation of benefits in incorporating aquifer thermal energy storage with heat pumps; and plans are being formulated to evaluate the potential benefit of using aquifer thermal energy storage to augment power plant cooling. Field testing to develop technologies for the recovery and reuse of industrial waste heat began with the instrumentation design for the ceramic/salt matrix in an operating brick-making plant. Work in advanced studies by Lawrence Berkeley Laboratory continued on thermochemical conversion and storage using small particles as the heat exchanger catalyst. In SO/sub 3/ dissociation experiments at 645/sup 0/C using light and dark conditions, results clearly demonstrated the benefit in directly radiantly heating the catalyst to accomplish the endothermic step of a thermochemical storage reaction.

  3. Lower Klickitat Riparian and In-channel Habitat Restoration Project; Klickitat Watershed Enhancement, Annual Report 2002-2003.

    SciTech Connect

    Conley, Will

    2004-01-01

    The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream and contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads

  4. Field evidence that ecosystem service projects support biodiversity and diversify options

    PubMed Central

    Goldman, Rebecca L.; Tallis, Heather; Kareiva, Peter; Daily, Gretchen C.

    2008-01-01

    Ecosystem service approaches to conservation are being championed as a new strategy for conservation, under the hypothesis that they will broaden and deepen support for biodiversity protection. Where traditional approaches focus on setting aside land by purchasing property rights, ecosystem service approaches aim to engage a much wider range of places, people, policies, and financial resources in conservation. This is particularly important given projected intensification of human impacts, with rapid growth in population size and individual aspirations. Here we use field research on 34 ecosystem service (ES) projects and 26 traditional biodiversity (BD) projects from the Western Hemisphere to test whether ecosystem service approaches show signs of realizing their putative potential. We find that the ES projects attract on average more than four times as much funding through greater corporate sponsorship and use of a wider variety of finance tools than BD projects. ES projects are also more likely to encompass working landscapes and the people in them. We also show that, despite previous concern, ES projects not only expand opportunities for conservation, but they are no less likely than BD projects to include or create protected areas. Moreover, they do not draw down limited financial resources for conservation but rather engage a more diverse set of funders. We also found, however, that monitoring of conservation outcomes in both cases is so infrequent that it is impossible to assess the effectiveness of either ES or BD approaches. PMID:18591667

  5. Field evidence that ecosystem service projects support biodiversity and diversify options.

    PubMed

    Goldman, Rebecca L; Tallis, Heather; Kareiva, Peter; Daily, Gretchen C

    2008-07-01

    Ecosystem service approaches to conservation are being championed as a new strategy for conservation, under the hypothesis that they will broaden and deepen support for biodiversity protection. Where traditional approaches focus on setting aside land by purchasing property rights, ecosystem service approaches aim to engage a much wider range of places, people, policies, and financial resources in conservation. This is particularly important given projected intensification of human impacts, with rapid growth in population size and individual aspirations. Here we use field research on 34 ecosystem service (ES) projects and 26 traditional biodiversity (BD) projects from the Western Hemisphere to test whether ecosystem service approaches show signs of realizing their putative potential. We find that the ES projects attract on average more than four times as much funding through greater corporate sponsorship and use of a wider variety of finance tools than BD projects. ES projects are also more likely to encompass working landscapes and the people in them. We also show that, despite previous concern, ES projects not only expand opportunities for conservation, but they are no less likely than BD projects to include or create protected areas. Moreover, they do not draw down limited financial resources for conservation but rather engage a more diverse set of funders. We also found, however, that monitoring of conservation outcomes in both cases is so infrequent that it is impossible to assess the effectiveness of either ES or BD approaches. PMID:18591667

  6. Spectroscopic Results from the Life in the Atacama (LITA) Project 2004 Field Season

    NASA Technical Reports Server (NTRS)

    Piatek, J. L.; Moersch, J. E.; Wyatt, M.; Rampey, M.; Cabrol, N. A.; Wettergreen, D. S.; Whittaker, R.; Grin, E. A.; Diaz, G. Chong

    2005-01-01

    Introduction: The Life in the Atacama (LITA) project includes rover field tests designed to look for life in the arid environment of the Atacama Desert (Chile). Field instruments were chosen to help remote observers identify potential habitats and the presence of life in these habitats, and included two spectrometers for help in identifying the mineralogy of the field sites. Two field trials were undertaken during the 2004 field season. The remote science team had no prior knowledge of the local geology, and relied entirely on orbital images and rover-acquired data to make interpretations. Each field trial lasted approximately one week: the sites for these trials were in different locations, and are designated "Site B" and "Site C."

  7. Energy Conservation: Field Projects. Phase 2: External Evaluation. Document 1: Report.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Objectives of Phase 2: Energy Conservation Field Projects were to: test the generalizability of the energy conservation measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as required; develop standards of energy consumption for Alberta schools by school type and size, and on the basis of…

  8. Energy Conservation Field Projects. Phase 2: External Evaluation. Document II: Appendices.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Provided are appendices which contain supporting documentation related to an external evaluation of the Phase 2: Energy Conservation Field Projects. Objectives of this program were to: test the generalizability of the energy conservations measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as…

  9. The European Ultrasonic Planetary Core Drill: Preliminary Results from Field Trials at the Haughton Mars Project

    NASA Astrophysics Data System (ADS)

    Worrall, K.; Timoney, R.; Li, X.; Harkness, P.; Lucas, M.

    2016-09-01

    This paper presents the findings of a recent field trip by the Ultrasonic Planetary Core Drill team to the Mars analog site at the Haughton Mars Project. Results of this trip are compared to results obtained drilling permafrost simulant in the lab.

  10. The Major Project in the Field of Education in Latin America and the Caribbean. Bulletin #12.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    The first segment of this bulletin is a summary presentation of the Second Meeting of the Regional Intergovernmental Committee of the Major Project in the Field of Education and the Sixth Regional Conference of Ministers of Education and Ministers Responsible for Economic Planning of the Member States in Latin America and the Caribbean (Bogota,…

  11. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the general requirements for a Field-Initiated Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION DISABILITY...

  12. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the general requirements for a Field-Initiated Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION DISABILITY...

  13. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the general requirements for a Field-Initiated Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION DISABILITY...

  14. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the general requirements for a Field-Initiated Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION DISABILITY...

  15. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    SciTech Connect

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  16. Kero Community School Field Report. Indigenous Mathematics Project. Working Paper 9.

    ERIC Educational Resources Information Center

    Johnson, Karen L.

    This report summarizes field work at Kero School in Papua New Guinea, one of five community schools participating in the ongoing research and development efforts of the Indigenous Mathematics Project (IMP). The introductory material describes the site, the school setting, and the community setting. Background on the IMP teacher and the size of…

  17. Ororo Community School Field Report. Indigenous Mathematics Project. Working Paper 7.

    ERIC Educational Resources Information Center

    Lineberger, Julie Diane

    This report summarizes field work in Ororo Community School located in Tokorara, a suburb of Port Moresby, the capital of Papua New Guinea. It is one of five community schools participating in the ongoing research and development efforts of the Indigenous Mathematics Project (IMP). The study opens with an introduction to the site, the school…

  18. Andra Community School Field Report. Indigenous Mathematics Project. Working Paper 6.

    ERIC Educational Resources Information Center

    Levin, Paula

    This report summarizes field work on Andra Island, Papua New Guinea, one of five community schools participating in the ongoing research and development efforts of the Indigenous Mathematics Project (IMP). It opens with an introduction to the site, the school setting, and the community setting. Background on the IMP teacher and the size of classes…

  19. Divanap Community School Field Report. Indigenous Mathematics Project. Working Paper 8.

    ERIC Educational Resources Information Center

    Gearhart, Maryl

    This report summarizes field work in Divanap, Papua New Guinea, one of five community schools participating in the ongoing research and development efforts of the Indigenous Mathematics Project (IMP). The site is described, with detailed comments on the school and the community. Background on the teacher is provided. Sizes of the two grade 2, one…

  20. Muglamp Community School Field Report. Indigenous Mathematics Project. Working Paper 10.

    ERIC Educational Resources Information Center

    Rowe, Robert D.

    This report summarizes field work in Muglamp, Papua New Guinea, one of five community schools participating in the ongoing research and development efforts of the Indigenous Mathematics Project (IMP). It begins with an introduction to the site, the school setting, and the community setting. The teacher's history and the number of students in one…

  1. Continuous fields of land cover for the conterminous United States using Landsat data: First results from the Web-Enabled Landsat Data (WELD) project

    USGS Publications Warehouse

    Hansen, M.C.; Egorov, A.; Roy, D.P.; Potapov, P.; Ju, J.; Turubanova, S.; Kommareddy, I.; Loveland, T.R.

    2011-01-01

    Vegetation Continuous Field (VCF) layers of 30 m percent tree cover, bare ground, other vegetation and probability of water were derived for the conterminous United States (CONUS) using Landsat 7 Enhanced Thematic Mapper Plus (ETM+) data sets from theWeb-Enabled Landsat Data (WELD) project. Turnkey approaches to land cover characterization were enabled due to the systematic WELD Landsat processing, including conversion of digital numbers to calibrated top of atmosphere reflectance and brightness temperature, cloud masking, reprojection into a continental map projection and temporal compositing. Annual, seasonal and monthly WELD composites for 2008 were used as spectral inputs to a bagged regression and classification tree procedure using a large training data set derived from very high spatial resolution imagery and available ancillary data. The results illustrate the ability to performLandsat land cover characterizations at continental scales that ar einternally consistent while retaining local spatial and thematic detail. ?? 2011 Taylor & Francis.

  2. Charge and parity projected relativistic mean field model with pion for finite nuclei

    SciTech Connect

    Ogawa, Yoko; Toki, Hiroshi; Tamenaga, Setsuo; Sugimoto, Satoru; Ikeda, Kiyomi

    2006-03-15

    We construct a new relativistic mean field model by explicitly introducing a {pi}-meson mean field with charge number and parity projection. We call this model the charge and parity projected relativistic mean field (CPPRMF) model. We take the chiral {sigma} model Lagrangian for the construction of finite nuclei. We apply this framework first for the {sup 4}He nucleus as a pilot case and study the role of the {pi}-meson field on the structure of nuclei. We demonstrate that it is essential to solve the mean field equation with the variation introduced after the projection in order to take the pionic correlations into account explicitly. We study the ground-state properties of {sup 4}He by varying several parameters, such as the {sigma}-meson mass and the {omega}-meson coupling constant. We are able to construct a good ground state for {sup 4}He. A depression appears in the central region of the density distribution, and the second maximum and the position of the dip in the form factor of {sup 4}He are naturally obtained in the CPPRMF model.

  3. Cytonuclear interactions affect adaptive traits of the annual plant Arabidopsis thaliana in the field

    PubMed Central

    Roux, Fabrice; Mary-Huard, Tristan; Barillot, Elise; Wenes, Estelle; Botran, Lucy; Durand, Stéphanie; Villoutreix, Romain; Martin-Magniette, Marie-Laure; Camilleri, Christine; Budar, Françoise

    2016-01-01

    Although the contribution of cytonuclear interactions to plant fitness variation is relatively well documented at the interspecific level, the prevalence of cytonuclear interactions at the intraspecific level remains poorly investigated. In this study, we set up a field experiment to explore the range of effects that cytonuclear interactions have on fitness-related traits in Arabidopsis thaliana. To do so, we created a unique series of 56 cytolines resulting from cytoplasmic substitutions among eight natural accessions reflecting within-species genetic diversity. An assessment of these cytolines and their parental lines scored for 28 adaptive whole-organism phenotypes showed that a large proportion of phenotypic traits (23 of 28) were affected by cytonuclear interactions. The effects of these interactions varied from slight but frequent across cytolines to strong in some specific parental pairs. Two parental pairs accounted for half of the significant pairwise interactions. In one parental pair, Ct-1/Sha, we observed symmetrical phenotypic responses between the two nuclear backgrounds when combined with specific cytoplasms, suggesting nuclear differentiation at loci involved in cytonuclear epistasis. In contrast, asymmetrical phenotypic responses were observed in another parental pair, Cvi-0/Sha. In the Cvi-0 nuclear background, fecundity and phenology-related traits were strongly affected by the Sha cytoplasm, leading to a modified reproductive strategy without penalizing total seed production. These results indicate that natural variation in cytoplasmic and nuclear genomes interact to shape integrative traits that contribute to adaptation, thereby suggesting that cytonuclear interactions can play a major role in the evolutionary dynamics of A. thaliana. PMID:26979961

  4. Cytonuclear interactions affect adaptive traits of the annual plant Arabidopsis thaliana in the field.

    PubMed

    Roux, Fabrice; Mary-Huard, Tristan; Barillot, Elise; Wenes, Estelle; Botran, Lucy; Durand, Stéphanie; Villoutreix, Romain; Martin-Magniette, Marie-Laure; Camilleri, Christine; Budar, Françoise

    2016-03-29

    Although the contribution of cytonuclear interactions to plant fitness variation is relatively well documented at the interspecific level, the prevalence of cytonuclear interactions at the intraspecific level remains poorly investigated. In this study, we set up a field experiment to explore the range of effects that cytonuclear interactions have on fitness-related traits in Arabidopsis thaliana To do so, we created a unique series of 56 cytolines resulting from cytoplasmic substitutions among eight natural accessions reflecting within-species genetic diversity. An assessment of these cytolines and their parental lines scored for 28 adaptive whole-organism phenotypes showed that a large proportion of phenotypic traits (23 of 28) were affected by cytonuclear interactions. The effects of these interactions varied from slight but frequent across cytolines to strong in some specific parental pairs. Two parental pairs accounted for half of the significant pairwise interactions. In one parental pair, Ct-1/Sha, we observed symmetrical phenotypic responses between the two nuclear backgrounds when combined with specific cytoplasms, suggesting nuclear differentiation at loci involved in cytonuclear epistasis. In contrast, asymmetrical phenotypic responses were observed in another parental pair, Cvi-0/Sha. In the Cvi-0 nuclear background, fecundity and phenology-related traits were strongly affected by the Sha cytoplasm, leading to a modified reproductive strategy without penalizing total seed production. These results indicate that natural variation in cytoplasmic and nuclear genomes interact to shape integrative traits that contribute to adaptation, thereby suggesting that cytonuclear interactions can play a major role in the evolutionary dynamics ofA. thaliana. PMID:26979961

  5. Effective field theory and projective construction for Zk parafermion fractional quantum Hall states

    NASA Astrophysics Data System (ADS)

    Barkeshli, Maissam; Wen, Xiao-Gang

    2010-04-01

    The projective construction is a powerful approach to deriving the bulk and edge field theories of non-Abelian fractional quantum Hall (FQH) states and yields an understanding of non-Abelian FQH states in terms of the simpler integer quantum Hall states. Here we show how to apply the projective construction to the Zk parafermion (Laughlin/Moore-Read/Read-Rezayi) FQH states, which occur at filling fraction ν=k/(kM+2) . This allows us to derive the bulk low-energy effective field theory for these topological phases, which is found to be a Chern-Simons theory at level 1 with a U(M)×Sp(2k) gauge field. This approach also helps us understand the non-Abelian quasiholes in terms of holes of the integer quantum Hall states.

  6. Data collection and field experiments at the Apache Leap research site. Annual report, May 1995--1996

    SciTech Connect

    Woodhouse, E.G.; Bassett, R.L.; Neuman, S.P.; Chen, G.

    1997-08-01

    This report documents the research performed during the period May 1995-May 1996 for a project of the U.S. Regulatory Commission (sponsored contract NRC-04-090-051) by the University of Arizona. The project manager for this research in Thomas J. Nicholson, Office of Nuclear Regulatory Research. The objectives of this research were to examine hypotheses and test alternative conceptual models concerning unsaturated flow and transport through fractured rock, and to design and execute confirmatory field and laboratory experiments to test these hypotheses and conceptual models at the Apache Leap Research Site near Superior, Arizona. Each chapter in this report summarizes research related to a specific set of objectives and can be read and interpreted as a separate entity. Topics include: crosshole pneumatic and gaseous tracer field and modeling experiments designed to help validate the applicability of contiuum geostatistical and stochastic concepts, theories, models, and scaling relations relevant to unsaturated flow and transport in fractured porous tuffs; use of geochemistry and aquifer testing to evaluate fracture flow and perching mechanisms; investigations of {sup 234}U/{sup 238}U fractionation to evaluate leaching selectivity; and transport and modeling of both conservative and non-conservative tracers.

  7. FY2013 Vehicle and Systems Simulation and Testing R&D Annual Progress Report

    SciTech Connect

    none,

    2014-02-01

    FY 2013 annual report focuses on the following areas: vehicle modeling and simulation, component and systems evaluations, laboratory and field evaluations, codes and standards, industry projects, and vehicle systems optimization.

  8. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  9. Trace projection transformation: A new method for measurement of debris flow surface velocity fields

    NASA Astrophysics Data System (ADS)

    Yan, Yan; Cui, Peng; Guo, Xiaojun; Ge, Yonggang

    2016-09-01

    Spatiotemporal variation of velocity is important for debris flow dynamics. This paper presents a new method, the trace projection transformation, for accurate, non-contact measurement of a debris-flow surface velocity field based on a combination of dense optical flow and perspective projection transformation. The algorithm for interpreting and processing is implemented in C ++ and realized in Visual Studio 2012. The method allows quantitative analysis of flow motion through videos from various angles (camera positioned at the opposite direction of fluid motion). It yields the spatiotemporal distribution of surface velocity field at pixel level and thus provides a quantitative description of the surface processes. The trace projection transformation is superior to conventional measurement methods in that it obtains the full surface velocity field by computing the optical flow of all pixels. The result achieves a 90% accuracy of when comparing with the observed values. As a case study, the method is applied to the quantitative analysis of surface velocity field of a specific debris flow.

  10. Use of INSAR in surveillance and control of a large field project

    SciTech Connect

    Patzek, T.W.; Silin, D.B.

    2000-06-01

    In this paper, we introduce a new element of our [1] multilevel, integrated surveillance and control system: satellite Synthetic Aperture Radar interferometry (InSAR) images of oil field surface. In particular, we analyze five differential InSAR images of the Belridge Diatomite field, CA, between 11/98 and 12/99. The images have been reprocessed and normalized to obtain the ground surface displacement rate. In return, we have been able to calculate pixel-by-pixel the net subsidence of ground surface over the entire field area. The calculated annual subsidence volume of 19 million barrels is thought to be close to the subsidence at the top of the diatomite. We have also compared the 1999 rate of surface displacement from the satellite images with the surface monument triangulations between 1942 and 1997. We have found that the maximum rate of surface subsidence has been steadily increasing from -0.8 ft/year in 1988-97 to -1 ft/year in 1998-99. The respective rates of uplift of the field fringes also increased from 0.1 ft/year to 0.24 ft/year. In 1999, the observed subsidence rate exceeded by 4.5 million barrels the volumetric deficit of fluid injection.

  11. 34 CFR 350.55 - What are the additional considerations for selecting Field-Initiated Project applications for...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the... Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of the... Project applications for funding? (a) The Secretary reserves funds to support some or all of the...

  12. 30 CFR 203.64 - How many applications may I file on a field or a development project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Sulfur General Royalty Relief for Pre-Act Deep Water Leases and for Development and Expansion Projects... application for royalty relief during the life of the field or for a development project or an expansion... for an expansion project; (c) You withdraw the application before we make a determination; or (d)...

  13. Project Adopsys as an example of international collaboration in the field of photonics

    NASA Astrophysics Data System (ADS)

    Zoric, Nenad; Livshits, Irina; Urbach, Paul

    2015-01-01

    Tendencies of international cooperation in engineering education became very visible during recent years. We demonstrate this statement on one currently running EU project ADOPSYS in the field of optical design, which is an important part of engineering education in photonics. This example shows the importance of the input from different countries and organizations - both from industry and academia. Seven universities and eight optical companies are involved in the project ADOPSYS. Sharing experience of Academia education activity we provide new international type of education "free-of borders". We are going to discuss the key enable technology - PHOTONICS, which is widely used in modern society. Engineering science became very international. For communicating between people from different countries the English language is now used almost exclusively. For a fruitful collaboration between people from different nations, in multi-national projects, tolerance and respect are required between people of different political, cultural, educational backgrounds.

  14. Field projects in the antrim shale: The Bagley East Project. Volume 2 - appendices. Topical report, July 1991-September 1992

    SciTech Connect

    Reeves, S.R.; Cox, D.O.; Wicks, D.E.

    1993-09-01

    This second volume of a two-volume set contains appendixes to the report of a field experiment conducted on an eight-well test pattern with the purpose of improving the understanding of the reservoir flow mechanics and economic benefits of coverting Antrim Shale wells using reverse gas-assist to mechanical pumping. Appendix A provides interpretation summaries of the pressure buildup tests performed on each of the wells at the Bagley East Project. For each well, a short description of the interpretation approach used and results obtained are discussed, and all diagnostic plots used for the analysis are presented for reference. Appendix B contains the reports provided by third parties related to log and core analyses performed on the Bagley East B3-11 well.

  15. Fish Habitat Improvement Projects in the Fifteenmile Creek and Trout Creek Basins of Central Oregon: Field Review and Management Recommendations.

    SciTech Connect

    Kauffman, J. Boone

    1993-07-01

    A field review of stream habitat improvement project sites in the lower Deschutes River Basin was conducted by riparian ecology, fisheries, and hydrology specialists. Habitat management objectives, limiting factors, project implementation, land use history, and other factors were discussed at each site. This information, in conjunction with the reviewer`s field inspections of portions of a particular habitat project, provided the basis for this report.

  16. Wide-field wide-band Interferometric Imaging: The WB A-Projection and Hybrid Algorithms

    NASA Astrophysics Data System (ADS)

    Bhatnagar, S.; Rau, U.; Golap, K.

    2013-06-01

    Variations of the antenna primary beam (PB) pattern as a function of time, frequency, and polarization form one of the dominant direction-dependent effects at most radio frequency bands. These gains may also vary from antenna to antenna. The A-Projection algorithm, published earlier, accounts for the effects of the narrow-band antenna PB in full polarization. In this paper, we present the wide-band A-Projection algorithm (WB A-Projection) to include the effects of wide bandwidth in the A-term itself and show that the resulting algorithm simultaneously corrects for the time, frequency, and polarization dependence of the PB. We discuss the combination of the WB A-Projection and the multi-term multi-frequency synthesis (MT-MFS) algorithm for simultaneous mapping of the sky brightness distribution and the spectral index distribution across a wide field of view. We also discuss the use of the narrow-band A-Projection algorithm in hybrid imaging schemes that account for the frequency dependence of the PB in the image domain.

  17. Rocketdyne division, environmental monitoring and facility effluent. Annual report, De Soto and Santa Susana Field Laboratories Sites, 1989

    SciTech Connect

    Moore, J. D.

    1990-05-01

    Work in nuclear energy research and development in what has become the Rocketdyne Division of Rockwell International Corporation began in 1946. During the evolution of these operations, small test and demonstration reactors and critical assemblies were operated, reactor fuel elements were fabricated and used reactor fuel elements were disassembled and declad. These projects have been completed and terminated over the past 30 years. Most of this work was performed at the Santa Susana Field Laboratories (SSFL) and is described in detail in Reference 18. No work with nuclear materials has been conducted since 1987, and the only ongoing work during 1989 was the cleanup of the Rockwell International Hot Laboratory (RIHL) and continuing decontamination of the remaining nuclear facilities. In October 1989, the NRC Special Nuclear Materials License was amended to permit only a minor amount of nuclear material for research purposes. Since then, the license has been further amended to permit only decommissioning operations. These operations have been conducted under State and Federal licenses and under contract to DOE and its predecessors at three main locations. identified as the Santa Susana Field Laboratories (SSFL). De Soto (DS), and Canoga (CA).

  18. Planning and Implementation of an Alkali-Surfactant-Polymer (ASP) Field Project

    SciTech Connect

    French, T.

    1999-03-05

    The Warden ASP project has progressed from the initial planning stage to construction of an injection plant. An ASP chemical system was designed based on laboratory evaluations that included interfacial tension, mobility requirements, rock-alkali interaction, fluid capabilities, and core tests. Field cores were obtained from the Permian No. 5 and No. 6 sands on the Warden lease in Sho-Vel-Tum oil field. A separate tank battery for the pilot pattern area was installed, and a field tracer test is currently being evaluated. Tracer test results to date indicate that there is no major fracturing in the No. 5 sand. There is indication, however, of some channeling through high permeability sand. The field injection plant was designed, and construction is in progress. Several variations of injection plant design have been evaluated. Some plant design details, such as alkali storage, were found to be dependent on the availability of use equipment and project budget. The surfactant storage facility design was shown to be dependent on surfactant rheology.

  19. Annual variations of the amplitude characteristic of the noise magnetic field in the ELF frequency range based on the results of high-latitude observations

    NASA Astrophysics Data System (ADS)

    Pchelkin, V. V.

    2014-09-01

    The annual variation of a number of amplitude characteristics of the noise electromagnetic field in the frequency range near the first Schumann resonance (and in particular the mean values of the modulus of horizontal magnetic components and parameters of the distribution function of noise pulses over amplitudes) was obtained and analyzed based on the results of three-year measurements performed at the high-latitude magnetic observatory Lovozero. The summer increase in mean and median values of the magnetic component of noises associated with electrical storms and the lack of annual variations of the exponent that empirically describes the distribution of amplitudes of noise signals were found. The relationship between the seasonal (winter/summer in the northern hemisphere) increase in the mean value of the modulus of the horizontal magnetic field component and seasonal increase in the global number of lightning discharges is shown by the correlation of the results of satellite observations and measurements of the magnetic component.

  20. Research in the Classroom. Ninth Annual Report of Research Projects Conducted by Educators in Their Classrooms, 1994-1995.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Education, Denver. Special Education Services Unit.

    The report summarizes five Colorado teacher research projects in teaching students with disabilities. The five projects described demonstrate that teacher initiated classroom based research allows educators to develop innovative approaches to instruction and to analyze their results in an objective way. The following projects are presented: (1)…

  1. NEDO'S project on geothermal reservoir engineering -- a reservoir engineering study of the Kirishima field, Japan

    SciTech Connect

    Kitamura, H.; Ishido, T.; Miyazaki, S.; Abe, I.; Nobumoto, R.

    1988-01-01

    In order to promote the development of geothermal energy resources, it is important to understand and (to the extent possible) to alleviate potential risks associated with each proposed development project. Further, it is essential to estimate the generation capacity of the reservoir prior to full-scale commitment so that the power plant design may be intelligently formulated. Starting in 1984, the New Energy Development Organization (NEDO) in Japan undertook a four-year program to develop technical methods for the evaluation of potential geothermal resources and for the prediction of production capacity and the appropriate level of electrical generation to be anticipated. NEDO’s general approach to theoretical reservoir evaluation is described, as is the schedule and progress along the four-year program toward its four main goals: development of reservoir simulators, drilling of observation wells in two model fields (the Sumikawa field in northern Honshu and the Kirishima field in southern Kyushu), well tests in the model fields, and reservoir simulation with natural-state and production calculation for both fields. The remainder of the paper describes some results obtained from the well testing program in the Kirishima field and ongoing studies of it.

  2. Evaluation of measurement reproducibility using the standard-sites data, 1994 Fernald field characterization demonstration project

    SciTech Connect

    Rautman, C.A.

    1996-02-01

    The US Department of Energy conducted the 1994 Fernald (Ohio) field characterization demonstration project to evaluate the performance of a group of both industry-standard and proposed alternative technologies in describing the nature and extent of uranium contamination in surficial soils. Detector stability and measurement reproducibility under actual operating conditions encountered in the field is critical to establishing the credibility of the proposed alternative characterization methods. Comparability of measured uranium activities to those reported by conventional, US Environmental Protection Agency (EPA)-certified laboratory methods is also required. The eleven (11) technologies demonstrated included (1) EPA-standard soil sampling and laboratory mass-spectroscopy analyses, and currently-accepted field-screening techniques using (2) sodium-iodide scintillometers, (3) FIDLER low-energy scintillometers, and (4) a field-portable x-ray fluorescence spectrometer. Proposed advanced characterization techniques included (5) alpha-track detectors, (6) a high-energy beta scintillometer, (7) electret ionization chambers, (8) and (9) a high-resolution gamma-ray spectrometer in two different configurations, (10) a field-adapted laser ablation-inductively coupled plasma-atomic emission spectroscopy (ICP-AES) technique, and (11) a long-range alpha detector. Measurement reproducibility and the accuracy of each method were tested by acquiring numerous replicate measurements of total uranium activity at each of two ``standard sites`` located within the main field demonstration area. Meteorological variables including temperature, relative humidity. and 24-hour rainfall quantities were also recorded in conjunction with the standard-sites measurements.

  3. Annual Progress Report of the Coastal Bend Migrant Council Health Project, San Patricio Migrant Health Center (Texas), 1973-1974.

    ERIC Educational Resources Information Center

    Coastal Bend Migrant Council, Mathis, TX. San Patricio Migrant Health Center.

    The annual medical progress report covers migrant health services in San Patricio County, Texas, from February 1, 1973 to January 31, 1974. The report discusses: staff, administration, cardiology, dental services, health services, medical services, outreach and environmental health services, prescription services, registration and identification,…

  4. Illuminating Engineering Research Institute Annual Report 1967. A Review of Project Activities and a Roundup of IERI Research Interests.

    ERIC Educational Resources Information Center

    Illuminating Engineering Research Inst., New York, NY.

    Presented in this report are the Illuminating Engineering Research Institute's fundamental scientific concepts in a new frame of realism while relating them to an up-to-date accounting of the search for new basic knowledge. In addition to being an annual accounting, it is also intended to provide orientation. Its presented in dramatic and…

  5. CEMEX: Cement Manufacturer Saves 2.1 Million kWh Annually with a Motor Retrofit Project

    SciTech Connect

    2010-06-25

    This DOE Industrial Technologies Program spotlight describes how the CEMEX cement manufacturing plant in Davenport, California, saves 2 million kWh and $168,000 in energy costs annually by replacing 13 worn-out motors with new energy-efficient ones.

  6. Studies in Teaching: 2002 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 2002)

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    2002-01-01

    This document presents the of an annual educational research forum held at Wake Forest University (Winston-Salem, North Carolina) on December 11, 2002. A table of contents and 27 research studies of high school teaching are included. Studies include: Effects of the Earth/Environmental Science Requirement on High School Science Enrollment in North…

  7. Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2

    SciTech Connect

    Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

    1997-03-11

    The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with

  8. The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2009-04-29

    Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

  9. Primary mapping and stratigraphic data and field methods for the Snowmastodon Project

    USGS Publications Warehouse

    Lucking, Carol; Johnson, Kirk R.; Pigati, Jeffery S.; Miller, Ian

    2012-01-01

    During the Snowmastodon Project, many different people collected data for a wide array of purposes under a variety of conditions. Early in the process and in an attempt to provide project-wide consistency, Kirk Johnson appointed Carol Lucking as the project’s data manager both in the field and the lab. She was responsible for using GIS to create maps on an ongoing basis throughout the project. Jeff Pigati agreed to measure stratigraphic sections and coordinate the collection of various nonvertebrate samples to make sure that all resulting data could be plotted on common diagrams. Kirk Johnson was onsite for the entire project and measured the basin margin stratigraphy on a daily basis as it was destroyed by the digging teams. In the fall of 2010, we treated the upper part of the site (which included discrete excavations for the mammoth, deer, and bison skeletons) as an archaeological excavation and the lower part of the site (which contained isolated mastodon, ground sloth, and bison bones) as a construction salvage site.

  10. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.

    SciTech Connect

    Simmons, M.; McKinstry, C.; Cook, C.

    2004-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a

  11. The Influence of Short Project Timeframes on Web Development Practices: A Field Study

    NASA Astrophysics Data System (ADS)

    Lang, Michael

    A number of recent surveys of Web development have revealed that typical project timeframes are of the order of 3 months. This chapter reports the findings of a field study conducted in Ireland which set out to contribute towards a better understanding of the nature of high-speed Web development practices. Qualitative interview data was gathered from 14 interviewees, purposefully selected from a variety of different organisations and backgrounds. This data was then analysed using the Grounded Theory method, and ten core dimensions were revealed: (1) the role of collaborative groupware tools; (2) collective code ownership; (3) timeframe driven by business imperatives; (4) enablers of productivity; (5) quality "satisficing"; (6) requirements clarity; (7) process maturity; (8) collectively agreed project schedules; (9) closeness to client; and (10) working software over documentation.

  12. Annual Review of BPA-Funded Anadromous Fish Projects, March 18-20, 1986, Holiday Inn Airport, Portland, Oregon.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-02-01

    This report contains descriptions of projects specifically related to anadromous salmonids. They include projects in the following categories: (1) fish and wildlife projects in western Montana; (2) fish health and physiology; (3) habitat enhancement and passage improvement - Oregon I; (4) passage improvement and natural propagation - Washington; (5) habitat enhancement and passage improvements - Oregon II; (6) future hydroelectric assessments; (7) habitat enhancement and passage improvement - Idaho; (8) downstream migration: flows and monitoring; (9) downstream migration: reservoir impacts; and (10) habitat evaluation and monitoring. (ACR)

  13. Geomagnetic field observations at a new Antarctic site, within the AIMNet project

    NASA Astrophysics Data System (ADS)

    Lepidi, Stefania; Cafarella, Lili; Santarelli, Lucia; Pietrolungo, Manuela; Urbini, Stefano; Piancatelli, Andrea; Biasini, Fulvio; di Persio, Manuele; Rose, Mike

    2010-05-01

    During the 2007-2008 antarctic campaign, the Italian PNRA installed a Low Power Magnetometer within the framework of the AIMNet (Antarctic International Magnetometer Network) project, proposed and coordinated by BAS. The magnetometer is situated at Talos Dome, around 300 km geographically North-West from Mario Zucchelli Station (MZS), and approximately at the same geomagnetic latitude as MZS. In this work we present a preliminary analysis of the geomagnetic field 1-min data, and a comparison with simultaneous data from different Antarctic stations.

  14. Critical temperature for {alpha}-particle condensation within a momentum-projected mean-field approach

    SciTech Connect

    Sogo, T.; Roepke, G.; Lazauskas, R.

    2009-05-15

    {alpha}-particle (quartet) condensation in homogeneous spin-isospin symmetric nuclear matter is investigated. The usual Thouless criterion for the critical temperature is extended to the quartet case. The in-medium four-body problem is strongly simplified by the use of a momentum-projected mean-field ansatz for the quartet. The self-consistent single-particle wave functions are shown and discussed for various values of the density at the critical temperature. Excellent agreement of the critical temperature with a numerical solution of the Faddeev-Yakubovsky equation is obtained.

  15. The first ISLSCP field experiment (FIFE). [International Satellite Land Surface Climatology Project

    NASA Technical Reports Server (NTRS)

    Sellers, P. J.; Hall, F. G.; Asrar, G.; Strebel, D. E.; Murphy, R. E.

    1988-01-01

    The background and planning of the first International Satellite Land Surface Climatology Project (ISLSCP) field experiment (FIFE) are discussed. In FIFE, the NOAA series of satellites and GOES will be used to provide a moderate-temporal resolution coarse-spatial resolution data set, with SPOT and aircraft data providing the high-spatial resolution pointable-instrument capability. The paper describes the experiment design, the measurement strategy, the configuration of the site of the experiment (which will be at and around the Konza prairie near Manhattan, Kansas), and the experiment's operations and execution.

  16. 2D ESR image reconstruction from 1D projections using the modulated field gradient method

    NASA Astrophysics Data System (ADS)

    Páli, T.; Sass, L.; Horvat, L. I.; Ebert, B.

    A method for the reconstruction of 2D ESR images from 1 D projections which is based on the modulated field gradient method has been explored. The 2D distribution of spin-labeled stearic acid in oriented and unoriented dimyristoyl phosphatidylcholine multilayers on a flat quartz support was determined. Such samples are potentially useful for the determination of lipid lateral diffusion in oriented multilayers by monitoring the spreading of a sharp concentration profile in one or two dimensions. The limitations of the method are discussed and the improvements which are needed for dynamic measurements are outlined.

  17. A low-cost and versatile system for projecting wide-field visual stimuli within fMRI scanners

    PubMed Central

    Greco, V.; Frijia, F.; Mikellidou, K.; Montanaro, D.; Farini, A.; D’Uva, M.; Poggi, P.; Pucci, M.; Sordini, A.; Morrone, M. C.; Burr, D. C.

    2016-01-01

    We have constructed and tested a custom-made magnetic-imaging-compatible visual projection system designed to project on a very wide visual field (~80°). A standard projector was modified with a coupling lens, projecting images into the termination of an image fiber. The other termination of the fiber was placed in the 3-T scanner room with a projection lens, which projected the images relayed by the fiber onto a screen over the head coil, viewed by a participant wearing magnifying goggles. To validate the system, wide-field stimuli were presented in order to identify retinotopic visual areas. The results showed that this low-cost and versatile optical system may be a valuable tool to map visual areas in the brain that process peripheral receptive fields. PMID:26092392

  18. Deflection tomographic reconstruction of a complex flow field from incomplete projection data

    NASA Astrophysics Data System (ADS)

    Zhang, Bin; He, Yan; Song, Yang; He, Anzhi

    2009-11-01

    Tomographic techniques are used for the investigation of complex flow fields by means of deflectometric methods. In this experiment, a modified algebraic reconstruction technique (ART) was applied to moiré deflection tomography. The algorithm was derived from the basic deflection formula and the deflection angles were used directly in iteration, which is completely different from the conventional ARTs with integral calculation that are commonly used in deflection tomography. A smoothing scheme was employed to improve the reconstruction under ill-posed conditions. The reconstruction technique was tested using simulated data for incompleteness conditions similar to those found in the experimental data. The complex density field with an opaque object in a supersonic wind tunnel was reconstructed from limited view angle projections, and the experimental reconstruction was then compared with the result obtained from the computational fluid dynamic analysis. The following paper details the experiment and discusses some measurement errors that occurred in the process.

  19. Time domain holography: Forward projection of simulated and measured sound pressure fields

    NASA Astrophysics Data System (ADS)

    de La Rochefoucauld, Ombeline; Melon, Manuel; Garcia, Alexandre

    2004-07-01

    In this article, the fundamental principles of forward projecting time domain acoustic pressure fields are summarized. Four different numerical approaches are presented and compared both with simulated and measured signals. The approaches differ in their definition domain: Frequency/time and space/wave vector domains. The simulated source is a planar baffled piston excited with a Gaussian pulsed velocity. The pressure radiated by two different real sources has been measured: The first source is made up of two baffled loudspeakers (a Gaussian white noise can be radiated by a third loudspeaker). The second one is a baffled aluminum plate excited by a short impact at its center. The influence of parameters such as the sound source radius, the array size, the number of microphones and the propagation distance is studied. Finally, results concerning the optimization of the sampling of the sound field are presented.

  20. Water chemistry, seepage investigation, streamflow, reservoir storage, and annual availability of water for the San Juan-Chama Project, northern New Mexico, 1942-2010

    USGS Publications Warehouse

    McKean, Sarah E.; Anderholm, Scott K.

    2014-01-01

    The Albuquerque Bernalillo County Water Utility Authority supplements the municipal water supply for the Albuquerque metropolitan area, in central New Mexico, with surface water diverted from the Rio Grande. The U.S. Geological Survey, in cooperation with the Albuquerque Bernalillo County Water Utility Authority, undertook this study in which water-chemistry data and historical streamflow were compiled and new water-chemistry data were collected to characterize the water chemistry and streamflow of the San Juan-Chama Project (SJCP). Characterization of streamflow included analysis of the variability of annual streamflow and comparison of the theoretical amount of water that could have been diverted into the SJCP to the actual amount of water that was diverted for the SJCP. Additionally, a seepage investigation was conducted along the channel between Azotea Tunnel Outlet and the streamflow-gaging station at Willow Creek above Heron Reservoir to estimate the magnitude of the gain or loss in streamflow resulting from groundwater interaction over the approximately 10-mile reach. Generally, surface-water chemistry varied with streamflow throughout the year. Streamflow ranged from high flow to low flow on the basis of the quantity of water diverted from the Rio Blanco, Little Navajo River, and Navajo River for the SJCP. Vertical profiles of the water temperature over the depth of the water column at Heron Reservoir indicated that the reservoir is seasonally stratified. The results from the seepage investigations indicated a small amount of loss of streamflow along the channel. Annual variability in streamflow for the SJCP was an indication of the variation in the climate parameters that interact to contribute to streamflow in the Rio Blanco, Little Navajo River, Navajo River, and Willow Creek watersheds. For most years, streamflow at Azotea Tunnel Outlet started in March and continued for approximately 3 months until the middle of July. The majority of annual streamflow

  1. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    SciTech Connect

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety

  2. 2006 Annual Merit Review Proceedings

    SciTech Connect

    2009-01-18

    Each year hydrogen and fuel cell projects funded by DOE's Hydrogen Program are reviewed for their merit during an Annual Merit Review and Peer Evaluation Meeting. The 2006 Annual Merit Review, held May 16-19, 2006 in Arlington, Va., showcased approximately 250 projects. Principal investigators presented their project status and results in oral and poster presentations, which are available in the 2006 Annual Merit Review Proceedings. A panel of more than 150 community experts peer reviewed two-t

  3. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  4. Baca Geothermal Demonstration project legal and regulatory challenges. First semi-annual report for period through June 30, 1980

    SciTech Connect

    Province, S.G.; Walter, K.M.; Miller, J.

    1980-12-01

    The Legal and Regulatory Constraints Reports identify and describe the major legal and institutional constraints associated with the Baca Geothermal Demonstration Project. The impacts of these constraints on the Project in terms of cost, schedule, and technical design are also analyzed. The purpose of these reports is to provide a guide for future geothermal development.

  5. Intensive Care Nursery (I.C.N.) Interact Project: Second Annual Report, July 1, 1981 to June 30, 1982.

    ERIC Educational Resources Information Center

    Children's Hospital Medical Center of Northern California, Oakland.

    The report details accomplishments in the second year of a project serving 136 infants thought to be at high risk for developmental disabilities because of prematurity and serious illness. The project features a developmental intervention begun in the intensive care nursery (ICN) and continued in the infant's home during the first year of life. A…

  6. Latest developments in lunar gravity field recovery within the project GRAZIL

    NASA Astrophysics Data System (ADS)

    Krauss, Sandro; Wirnsberger, Harald; Klinger, Beate; Mayer-Gürr, Torsten; Baur, Oliver

    2016-04-01

    The project GRAZIL addresses the highly accurate recovery of the lunar gravity field using intersatellite Ka-band ranging (KBR) measurements collected by the Lunar Gravity Ranging System (LGRS) of the Gravity Recovery And Interior Laboratory (GRAIL) mission. Dynamic precise orbit determination is an indispensable task in order to recover the lunar gravity field based on LGRS measurements. The concept of variational equations is adopted to determine the orbit of the two GRAIL satellites based on radio science data. In this contribution we focus on the S-band two-way Doppler data collected by the Deep Space Network. As far as lunar gravity field recovery is concerned, we apply an integral equation approach using short orbital arcs in the order of one hour. In this contribution special attention is given to the refinement of our processing strategy in conjunction with an increase of the spectral resolution. Based on these considerations we present the latest version of a lunar gravity field model developed in Graz which is based on KBR observations during the primary mission phase (March 1 to May 29, 2012). Our results are validated against GRAIL models computed at NASA-GSFC and NASA-JPL.

  7. 34 CFR 350.55 - What are the additional considerations for selecting Field-Initiated Project applications for...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the... 34 Education 2 2013-07-01 2013-07-01 false What are the additional considerations for selecting Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of...

  8. 34 CFR 350.55 - What are the additional considerations for selecting Field-Initiated Project applications for...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the... 34 Education 2 2014-07-01 2013-07-01 true What are the additional considerations for selecting Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of...

  9. 34 CFR 350.55 - What are the additional considerations for selecting Field-Initiated Project applications for...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the... 34 Education 2 2011-07-01 2010-07-01 true What are the additional considerations for selecting Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of...

  10. 34 CFR 350.55 - What are the additional considerations for selecting Field-Initiated Project applications for...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the... 34 Education 2 2012-07-01 2012-07-01 false What are the additional considerations for selecting Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of...

  11. The Major Project in the Field of Education in the Latin American and Caribbean Region. Bulletin 10-11.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    The Major Project in the Field of Education stresses renewed and intensive efforts by Latin American and Caribbean Island countries to provide the resources and training necessary to meet basic education needs by the year 2000. This document examines project achievements, innovations, and problems through 1986 in the areas of rural education,…

  12. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2002-2003 Annual Report.

    SciTech Connect

    Faucera, Jason

    2003-06-23

    This project was designed to provide project coordination and technical assistance to producers in Sherman County for on the ground water quality enhancement and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Enhancement Reserve Program (CREP) and other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Three of those four streams and one other major Sherman County stream are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Temperature in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA Natural Resources Conservation Service, assist landowners in developing Resource Management Systems (RMS) that address resource concerns

  13. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2003-2004 Annual Report.

    SciTech Connect

    Faucera, Jason

    2004-05-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  14. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon : Coordination and Technical Assistance, 2004-2005 Annual Report.

    SciTech Connect

    Faucera, Jason

    2005-06-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  15. Kelt Reconditioning: A Research Project to Enhance Iteroparity in Columbia Basin Steelhead (Oncorhynchus mykiss), 2004 Annual Report.

    SciTech Connect

    Hatch, Douglas R.; Branstetter, Ryan; Whiteaker, John

    2004-11-01

    experiment. All steelhead kelts received hw-wiegandt multi vit dietary supplement as a means to improve initial nutrition. Long-term steelhead kelts received Moore-Clark pellets to provide essential minerals and nutrients necessary for gonadal redevelopment. Oxytetracycline was administered to all reconditioned fish to boost immune system response following the stress of initial capture. To control parasitic infestations two methods were used, first, after initial capture an intubation of Ivermectin{trademark} was administered to control internal parasites (e.g., Salmincola spp.). Next, a Formalin drip was used for the duration of reconditioning to prevent fungal outbreaks. Captured kelts were separated into three experimental groups: short-term reconditioning, long-term reconditioning, and direct transport and release. Success indicators for the short-term experiment include the proportion of fish that survived the reconditioning process and the proportion of fish that initiated a feeding response. Short-term kelts were reconditioned for 3 to 5 weeks. Surviving specimens were released for natural spawning on May 11, 2004. Survival-to-release was good for the short-term experiment, with a rate of 79.0%. Long-term steelhead kelts are currently being held for a 6-9 month period with a scheduled release in December 2004. Long-term success indicators include the proportion of fish that survived the reconditioning process and the proportion of surviving fish that successfully remature. Survival and rematuration for long-term kelts has not been determined and will be presented in the 2005 annual report. Direct transport and release kelts and short-term reconditioned kelts were radio or acoustic tagged to assess their travel time and migratory behaviors below Bonneville Dam. A total of 29 direct-transport and release kelts and 29 short-term reconditioned kelts received surgically implanted radio tags, and a total of 28 direct-transport/release and 26 short-term reconditioned fish

  16. Imaging Seismic Source Variations Using Back-Projection Methods at El Tatio Geyser Field, Northern Chile

    NASA Astrophysics Data System (ADS)

    Kelly, C. L.; Lawrence, J. F.

    2014-12-01

    During October 2012, 51 geophones and 6 broadband seismometers were deployed in an ~50x50m region surrounding a periodically erupting columnar geyser in the El Tatio Geyser Field, Chile. The dense array served as the seismic framework for a collaborative project to study the mechanics of complex hydrothermal systems. Contemporaneously, complementary geophysical measurements (including down-hole temperature and pressure, discharge rates, thermal imaging, water chemistry, and video) were also collected. Located on the western flanks of the Andes Mountains at an elevation of 4200m, El Tatio is the third largest geyser field in the world. Its non-pristine condition makes it an ideal location to perform minutely invasive geophysical studies. The El Jefe Geyser was chosen for its easily accessible conduit and extremely periodic eruption cycle (~120s). During approximately 2 weeks of continuous recording, we recorded ~2500 nighttime eruptions which lack cultural noise from tourism. With ample data, we aim to study how the source varies spatially and temporally during each phase of the geyser's eruption cycle. We are developing a new back-projection processing technique to improve source imaging for diffuse signals. Our method was previously applied to the Sierra Negra Volcano system, which also exhibits repeating harmonic and diffuse seismic sources. We back-project correlated seismic signals from the receivers back to their sources, assuming linear source to receiver paths and a known velocity model (obtained from ambient noise tomography). We apply polarization filters to isolate individual and concurrent geyser energy associated with P and S phases. We generate 4D, time-lapsed images of the geyser source field that illustrate how the source distribution changes through the eruption cycle. We compare images for pre-eruption, co-eruption, post-eruption and quiescent periods. We use our images to assess eruption mechanics in the system (i.e. top-down vs. bottom-up) and

  17. Ground Water Quality and Riparian Enhancement Projects in Sherman County, Oregon; Coordination and Technical Assistance, 2005-2006 Annual Report.

    SciTech Connect

    Faucera, Jason

    2006-06-01

    This project was designed to provide technical assistance and project coordination to producers in Sherman County for on the ground water quality and riparian enhancement projects. This is accomplished utilizing the USDA Conservation Reserve Enhancement Program (CREP) in addition to other grant monies to translate the personnel funds in this project to on the ground projects. Two technicians and one watershed council coordinator are funded, either wholly or in part, by funds from this grant. The project area encompasses the whole of Sherman County which is bordered almost entirely by streams providing habitat or migration corridors for endangered fish species including steelhead and Chinook salmon. Of those four streams that comprise Sherman County's boundaries, three are listed on the DEQ 303(d) list of water quality limited streams for exceeding summer temperature limits. Only one stream in the interior of Sherman County is 303(d) listed for temperatures, but is the largest watershed in the County. Temperatures in streams are directly affected by the amount of solar radiation allowed to reach the surface of the water. Practices designed to improve bank-side vegetation, such as the CREP program, will counteract the solar heating of those water quality listed streams, benefiting endangered stocks. CREP and water quality projects are promoted and coordinated with local landowners through locally-led watershed councils. Funding from BPA provides a portion of the salary for a watershed council coordinator who acts to disseminate water quality and USDA program information directly to landowners through watershed council activities. The watershed coordinator acts to educate landowners in water quality and riparian management issues and to secure funds for the implementation of on the ground water quality projects. Actual project implementation is carried out by the two technicians funded by this project. Technicians in Sherman County, in cooperation with the USDA

  18. Catalog of Adult Education Projects. Fiscal Year 1983.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC. Clearinghouse on Adult Education.

    This catalog, the sixth in a series of annual listings of special adult education projects, is designed to keep practitioners in the field of adult education informed about projects funded by states under section 310 of the Adult Education Act. Included in the catalog are descriptions of a total of 243 projects focusing on the following program…

  19. John Day Basin Spring Chinook Salmon Escapement and Productivity Monitoring; Fish Research Project Oregon, 2000-2001 Annual Report.

    SciTech Connect

    Carmichael, Richard W.; Claire, Glenda M.; Seals, Jason

    2002-01-01

    The four objectives of this report are: (1) Estimate annual spawner escapement and number of spring chinook salmon redds in the John Day River basin; (2) Determine sex ratio, age composition, length-at-age of spawners, and proportion of natural spawners that are hatchery origin strays; (3) Determine adequacy of historic index surveys for indexing spawner abundance and for detecting changes in spawner distribution through time; and (4) Estimate smolt-to-adult survival for spring chinook salmon emigrating from the John Day River basin.

  20. Distributed but convergent ordering of corticostriatal projections: analysis of the frontal eye field and the supplementary eye field in the macaque monkey.

    PubMed

    Parthasarathy, H B; Schall, J D; Graybiel, A M

    1992-11-01

    The degree of parallel processing in frontal cortex-basal ganglia circuits is a central and debated issue in research on the basal ganglia. To approach this issue directly, we analyzed and compared the corticostriatal projections of two principal oculomotor areas of the frontal lobes, the frontal eye field (FEF) and the supplementary eye field (SEF). We first identified cortical regions within or adjacent to each eye field by microstimulation in macaque monkeys and then injected each site with either 35S-methionine or WGA-HRP conjugate. We analyzed the corticostriatal projections and also the interconnections of the pairs of cortical areas. We observed major convergence of the projections of the FEF and the SEF within the striatum, principally in the caudate nucleus. In cross sections through the striatum, both projections were broken into a series of discontinuous input zones that seemed to be part of complex three-dimensional labyrinths. Where the FEF and SEF projection fields were both present, they overlapped patch for patch. Thus, both inputs were dispersed within the striatum but converged with one another. Striatal afferents from cortex adjacent to the FEF and the SEF did not show convergence with SEF and FEF inputs, but did, in part, converge with one another. For all pairs of cortical areas tested, the degree of overlap in the corticostriatal projections appeared to be directly correlated with the degree of cortical interconnectivity of the areas injected. All of the corticostriatal fiber projections observed primarily avoided immunohistochemically identified striosomes. We conclude that there is convergence of oculomotor information from two distinct regions of the frontal cortex to the striatal matrix, which is known to project into pallidonigral circuits including the striatonigrocollicular pathway of the saccadic eye movement system. Furthermore, functionally distinct premotor areas near the oculomotor fields often systematically projected to striatal

  1. Water quality, streamflow conditions, and annual flow-duration curves for streams of the San Juan–Chama Project, southern Colorado and northern New Mexico, 1935-2010

    USGS Publications Warehouse

    Falk, Sarah E.; Anderholm, Scott K.; Hafich, Katya A.

    2013-01-01

    The Albuquerque–Bernalillo County Water Utility Authority supplements the municipal water supply for the Albuquerque metropolitan area, in central New Mexico, with water diverted from the Rio Grande. Water diverted from the Rio Grande for municipal use is derived from the San Juan–Chama Project, which delivers water from streams in the southern San Juan Mountains in the Colorado River Basin in southern Colorado to the Rio Chama watershed and the Rio Grande Basin in northern New Mexico. The U.S. Geological Survey, in cooperation with Albuquerque–Bernalillo County Water Utility Authority, has compiled historical streamflow and water-quality data and collected new water-quality data to characterize the water quality and streamflow conditions and annual flow variability, as characterized by annual flow-duration curves, of streams of the San Juan–Chama Project. Nonparametric statistical methods were applied to calculate annual and monthly summary statistics of streamflow, trends in streamflow conditions were evaluated with the Mann–Kendall trend test, and annual variation in streamflow conditions was evaluated with annual flow-duration curves. The study area is located in northern New Mexico and southern Colorado and includes the Rio Blanco, Little Navajo River, and Navajo River, tributaries of the San Juan River in the Colorado River Basin located in the southern San Juan Mountains, and Willow Creek and Horse Lake Creek, tributaries of the Rio Chama in the Rio Grande Basin. The quality of water in the streams in the study area generally varied by watershed on the basis of the underlying geology and the volume and source of the streamflow. Water from the Rio Blanco and Little Navajo River watersheds, primarily underlain by volcanic deposits, volcaniclastic sediments and landslide deposits derived from these materials, was compositionally similar and had low specific-conductance values relative to the other streams in the study area. Water from the Navajo River

  2. SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Solar-collector field experimental tests

    SciTech Connect

    Zimmerman, J.C.; Al-Abbadi, N.

    1987-06-01

    The solar-collection field subsystem of the solar-powered desalination pilot project located at Yanbu in the Kingdom of Saudi Arabia has been operated successfully for two years. It has been demonstrated that during a one-year period, the solar-collector field can, on the average, provide about 2500 kWh of thermal energy a day for days with a daily insolation total greater than 4000 Wh/m/sup 2/. This is a yearlong solar-collector field average efficiency of 22.5%. In Yanbu, from October 1, 1985, until September 30, 1986, there were only 21 days (5.8%) when the daily direct-normal insolation was less than the mid-60% to 70% range with a peak output of 51 kW per solar collector. It has also been demonstrated that the Power Kinetics, Inc., square-dish solar collector has a problem due to the fixed aperture (outboard focus) that seriously hurts the performance of the solar collector during the summer months at this latitude. A location at latitudes greater than +-35/degree/ would see greatly improved daylong summer performance. 4 refs., 3 figs., 1 tab.

  3. Reinventing Project-Based Learning: Your Field Guide to Real-World Projects in the Digital Age

    ERIC Educational Resources Information Center

    Boss, Suzie; Krauss, Jane

    2007-01-01

    "Reinventing Project-Based Learning" offers educators an accessible guide for maximizing the benefits of project-based learning in today's technology-rich learning environment. This reader-friendly book speaks directly to educators, administrators, and professional development specialists who want to transform learning into a more active,…

  4. Building a field- and model-based climatology of local water and energy cycles in the cultivated Sahel - annual budgets and seasonality

    NASA Astrophysics Data System (ADS)

    Velluet, C.; Demarty, J.; Cappelaere, B.; Braud, I.; Issoufou, H. B.-A.; Boulain, N.; Ramier, D.; Mainassara, I.; Charvet, G.; Boucher, M.; Chazarin, J.-P.; Oï, M.; Yahou, H.; Maidaji, B.; Arpin-Pont, F.; Benarrosh, N.; Mahamane, A.; Nazoumou, Y.; Favreau, G.; Seghieri, J.

    2014-05-01

    In the African Sahel, energy and water cycling at the land surface is pivotal for regional climate, water resources and land productivity, yet it is still extremely poorly documented. As a step towards a comprehensive climatological description of surface fluxes in this area, this study provides estimates of average annual budgets and seasonal cycles for two main land use types of the cultivated Sahelian belt, rainfed millet crop and fallow bush. These estimates build on the combination of a 7 year field dataset from two typical plots in southwestern Niger with detailed physically-based soil-plant-atmosphere modelling, yielding a continuous, comprehensive set of water and energy flux and storage variables over the 7 year period. In this study case in particular, blending field data with mechanistic modelling is considered as making best use of available data and knowledge for such purpose. It extends observations by reconstructing missing data and extrapolating to unobserved variables or periods. Furthermore, model constraining with observations compromises between extraction of observational information content and integration of process understanding, hence accounting for data imprecision and departure from physical laws. Climatological averages of all water and energy variables, with associated sampling uncertainty, are derived at annual to subseasonal scales from the 7 year series produced. Similarities and differences in the two ecosystems behaviors are highlighted. Mean annual evapotranspiration is found to represent ~82-85% of rainfall for both systems, but with different soil evaporation/plant transpiration partitioning and different seasonal distribution. The remainder consists entirely of runoff for the fallow, whereas drainage and runoff stand in a 40-60% proportion for the millet field. These results should provide a robust reference for the surface energy- and water-related studies needed in this region. The model developed in this context has the

  5. St. Charles County Weldon Spring citizens commission communication education project overview for 1995. Annual report, October 1, 1994--September 30, 1995

    SciTech Connect

    1998-01-01

    The Weldon Spring DOE grantee, St. Charles County, is seeking an early renewal on the Weldon Spring Grant order to match the grant`s reporting calendar with the County`s fiscal calendar which is January through December. Therefore, this renewal application will cover five months time instead of 12 months. This notified annual overview bridges a two month period that precedes the appointment and activation of the Weldon Spring Citizens Commission in February 1995. In the original grant application the County described its intent to select a volunteer Citizens Oversight Commission to monitor the cleanup activities at the DOE`s Weldon Spring Site. This commission would serve at the County`s watchdog group by monitoring Weldon Spring Site activities and provide on-going communication to the County`s residents through publications and forums. The first eight months of the project involved setting up the project office and working with a three member {open_quotes}Section Panel/Work Group{close_quotes} to select the Citizen`s Commission. These activities were coordinated by a Project Director hired by the County and funded from the initial grant funds.

  6. Operation Sun Beam, Shot Small Boy. Project Officer's report - Project 6. 9. Correlation of present and previous electric-field measurements

    SciTech Connect

    Reno; Fowles, H.M.

    1985-09-01

    On most previous nuclear detonations, signatures and quantitative measurements of the electric-field signals associated with the detonations was obtained at distances such that normal radiation field characteristics apply. On Small Boy, measurements were made from stations located much closer in, such as to be inside, on the boundary of and just outside the limits of the ionized sphere created by the nuclear burst. The electric-field characteristics in these regions were unknown. In the hope of providing continuity from the region of the unknown into the reasonably well-understood region of the radiation field, this project was requested to make the typical radiation-field type of measurement that had been made on previous detonations. This report covers the signature characteristics and quantitative measurements of the electric-field signal from Small Boy as seen from outside the immediate region of theoretical generating mechanism.

  7. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    SciTech Connect

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  8. Presentation at Innoventure Annual Competition

    SciTech Connect

    2010-03-31

    This report documents the components of the workshop presented at the recent annual competition for the Innoventure program. The goal of the workshop was to focus on the delivery of science, technology, engineering, and math (STEM) concepts in a hands-on experiential learning format to increase interest in national security careers at NNSA, most of which are in the STEM fields. This work is a part of the National Security Preparedness Project (NSPP), being performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant.

  9. Research project on CO{sub 2}-induced climate change. Annual progress report, March 1, 1994--February 28, 1995

    SciTech Connect

    Cess, R.D.; Hameed, S.

    1995-01-01

    This summarizes current progress in the research project at SUNY Stony Brook on CO2-induced climate change. Three tasks are described, corresponding to the task categories in the USDOE/PRC CAS cooperative project on climate change. Task 1, led by Dr. Robert Cess, concerns the intercomparison of CO2 related climatic warming in contemporary general circulation models. Task 2, directed by Dr. Sultan Hameed, looks at understanding the natural variability in climatic data and comparing its significant features between observations and model simulations. Task 3, also directed by Dr. Hameed focuses on analysis of historical climate data developed at the institute of Geography of the Chinese Academy of Sciences.

  10. Off-axis photopolymer holographic elements for large-field-of-view visor-projected displays

    NASA Astrophysics Data System (ADS)

    Sergeant, Shirley A.; Hurst, Andrew E.

    1995-03-01

    A number of helmet mounted displays have been designed in recent years. The majority of these designs have been dismissed on the grounds of safety when considering the optical configuration. The principle of the design discussed in this paper is that of a display projected using the visor, where it acts not only as the display visor but also provides windblast, laser, and nuclear flash, protection. The display is projected by means of a holographic combining element on the visor. This paper addresses the design and manufacture of the holographic components employed, discussing the use of DuPont photopolymer material for this application. Off-axis holograms configured around the geometry of the head/helmet, give a wide field of view, with good eye relief. Well defined reflective and transmissive properties of the hologram are required to give full system compatibility. The resultant system does not compromise the safety of the user, whilst maintaining a fully integrated man/machine interface, i.e. low mass, and manageable center of gravity.

  11. 3D fingerprint imaging system based on full-field fringe projection profilometry

    NASA Astrophysics Data System (ADS)

    Huang, Shujun; Zhang, Zonghua; Zhao, Yan; Dai, Jie; Chen, Chao; Xu, Yongjia; Zhang, E.; Xie, Lili

    2014-01-01

    As an unique, unchangeable and easily acquired biometrics, fingerprint has been widely studied in academics and applied in many fields over the years. The traditional fingerprint recognition methods are based on the obtained 2D feature of fingerprint. However, fingerprint is a 3D biological characteristic. The mapping from 3D to 2D loses 1D information and causes nonlinear distortion of the captured fingerprint. Therefore, it is becoming more and more important to obtain 3D fingerprint information for recognition. In this paper, a novel 3D fingerprint imaging system is presented based on fringe projection technique to obtain 3D features and the corresponding color texture information. A series of color sinusoidal fringe patterns with optimum three-fringe numbers are projected onto a finger surface. From another viewpoint, the fringe patterns are deformed by the finger surface and captured by a CCD camera. 3D shape data of the finger can be obtained from the captured fringe pattern images. This paper studies the prototype of the 3D fingerprint imaging system, including principle of 3D fingerprint acquisition, hardware design of the 3D imaging system, 3D calibration of the system, and software development. Some experiments are carried out by acquiring several 3D fingerprint data. The experimental results demonstrate the feasibility of the proposed 3D fingerprint imaging system.

  12. Preparing Girls To Care for Self and Families Project. Annual Report: July 1, 1988-June 30, 1989.

    ERIC Educational Resources Information Center

    Owensboro Public Schools, KY.

    A Preparing Girls Project was incorporated into the Teenage Parent Program, which had been in operation in the Owensboro (Kentucky) City School System since August 1961. It was intended to produce more capable single teen mothers who would be more likely to finish their education and join the labor force. The assessment instruments were reworked…

  13. Teenage Parent Center of the Single Parent Assistance, Counseling and Education Project. Annual Report FY 86-87.

    ERIC Educational Resources Information Center

    Middlesex County Vocational and Technical High Schools, New Brunswick, NJ.

    The Teenage Parent Center of the Single Parent Assistance, Counseling and Education Project was developed to support, guide, and direct adolescent mothers, pregnant teenagers, and teens at risk of becoming parents through successful completion of a high school diploma or school year in a vocational setting in Middlesex County, New Jersey. The…

  14. Working Parents Project (WPP), Division of Family, School and Community Studies (DFSCS) Annual Report and Executive Summary.

    ERIC Educational Resources Information Center

    Espinoza, Renato; And Others

    The basic goal of the Working Parents Project (WPP) has been to contribute to the understanding of issues arising from the relationship between work and family life. The WPP perspective pays particular attention to the ways workplace culture affects the ability of family members to participate in their children's education at home and in school.…

  15. Studies in Teaching 2001 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 2001).

    ERIC Educational Resources Information Center

    McCoy, Leah P.

    This collection of research projects includes: "What Types of Questions Do Mathematics Teachers Ask?" (Cynthia L. Adams); "Will Alternate Assessment Formats Create a Difference in Student Motivation to Study?" (Robyn J. Allen); "Factors Affecting the Motivation of Students" (Dejon J. Banks); "The Dynamics of English Classes with Gender Minorities"…

  16. Research in the Classroom: Eighth Annual Report of Research Projects Conducted by Educators in Their Classrooms 1993-94.

    ERIC Educational Resources Information Center

    Colorado Council for Learning Disabilities.

    This publication contains reports on eight research studies proposed, developed, and conducted by special education teachers in their own classrooms. The projects are: "Chapter 1 and Special Education Working Together To Activate Students' Participation in Applying Math through the Use of Technology" (Megan Haynes Blancett and Carol Nollsch); "A…

  17. Secondary natural gas recovery: Targeted technology applications for in-field reserve growth. Annual report, August 1988-August 1989

    SciTech Connect

    Finley, R.J.; Guevara, E.H.; Jirik, L.A.; Kerr, D.R.; Langford, R.P.

    1990-01-15

    Activities during the year comprised screening and selection of gas fields for detailed studies; integrated geological, petrophysical, geophysical, and engineering analyses of the fields selected; and data acquisition in cooperative wells. A comprehensive workplan was prepared, and a methodology for geological and engineering screening of sandstone reservoirs was developed and applied to leading candidate fields. Contacts made with field operators resulted in active participation of Mobil Exploration and Producing U.S., Inc., and Shell Western Exploration and Production Inc. Lake Creek, Seeligson, McAllen Ranch, and Stratton-Agua Dulce fields were selected for study. These fields are representative of a spectrum of depositional systems and reservoir heterogeneities in highly productive gas reservoirs in the Texas coastal plain. Producing intervals are fluvial Frio reservoirs in Seeligson and Stratton-Agua Dulce fields, deltaic Vicksburg reservoirs in McAllen Ranch field, and deltaic Wilcox reservoirs in Lake Creek field. New data, comprising cores, open- and cased-hole logs, vertical seismic profiles, and sequential formation-pressure tests, were acquired in two wells in Seeligson field and in one well in McAllen Ranch field. Results to date suggest that reservoir heterogeneity can be defined using integrated geologic, geophysical, and engineering data.

  18. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    SciTech Connect

    Kupferman, S.L.

    1987-05-01

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group has also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.

  19. Large-scale full-field metrology using projected fringes: some challenges and solutions

    NASA Astrophysics Data System (ADS)

    Huntley, Jonathan M.; Ogundana, Tokunbo; Burguete, Richard L.; Coggrave, C. Russell

    2007-06-01

    The application of optical techniques to the measurement of shape and deformation of structures in the aerospace industry poses unique challenges resulting from the large length scales involved, which are typically in the 1-10 m range. For example, the relative immobility of large samples requires a network of sensors to be linked into a common global coordinate system; traceable calibration requires the development of new types of calibration artefact; and traditional interferometric techniques for displacement field mapping are frequently too sensitive to observe the physical effect of interest. We describe a system designed to address some of these problems based on the projected fringe technique combined with temporal phase unwrapping. Multiple cameras and projectors are linked into a common coordinate system using calibration concepts borrowed from the photogrammetry field. Traceable calibration is achieved through the use of reference spheres separated by a bar of known length. Traditional two-dimensional image processing techniques for recognizing circles (Hough transforms) have been extended to the automatic detection of spheres within the measured 3-D point clouds. Bundle adjustment software has been developed to refine the camera and projector calibration parameters as well as the rigid body translation and rotation coordinates defining the poses of the calibration artefact. An overview of all these aspects of the developed techniques is given in the paper. Typical results from a compression test on a large scale aluminium structure, performed on-site at Airbus UK using the developed system, are also presented.

  20. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts, personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water