Establishing Final Cleanup Decisions for the Hanford Site River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Sands, J.P.
2007-07-01
A major challenge in the River Corridor Closure Contract is establishing final cleanup decisions for the source operable units in the Hanford Site river corridor. Cleanup actions in the river corridor began in 1994 and have been performed in accordance with a 'bias for action' approach adopted by the Tri-Parties - the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology. This approach enabled early application of cleanup dollars on actual remediation of contaminated waste sites. Consequently, the regulatory framework authorizing cleanup actions at source operable units in the river corridor consists largely of interimmore » action records of decision, which were supported by qualitative risk assessments. Obtaining final cleanup decisions for the source operable units is necessary to determine whether past cleanup actions in the river corridor are protective of human health and the environment and to identify any course corrections that may be needed to ensure that ongoing and future cleanup actions are protective. Because the cleanup actions are ongoing, it is desirable to establish the final cleanup decisions as early as possible to minimize the impacts of any identified course corrections to the present cleanup approach. Development of a strategy to obtain final cleanup decisions for the source operable units in a manner that is responsive to desires for an integrated approach with the groundwater and Columbia River components while maintaining the ability to evaluate each component on its own merit represents a significant challenge. There are many different options for grouping final cleanup decisions, and each involved party or stakeholder brings slightly different interests that shape the approach. Regardless of the selected approach, there are several specific challenges and issues to be addressed before making final cleanup decisions. A multi-agency and contractor working group has been established to address these issues and develop an endorsed strategy. Ultimately, it is anticipated that the Tri-Parties will establish a set of milestones to document pathway selection and define schedule requirements. (authors)« less
Risk Assessment Approach for the Hanford Site River Corridor Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomson, J.E.; Weiss, S.G.; Sands, J.P.
2007-07-01
The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less
Central Plateau Cleanup at DOE's Hanford Site - 12504
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dowell, Jonathan
The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all othermore » unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
EPA has developed this guide to provide decision-makers, such as city planners, private sector developers, and other involved in redeveloping brownfields, with a better understanding of the technical issues involved in assessing and cleaning up iron and steel mill sites so they can make the most informed decisions possible. This overview of the technical process involved in assessing and cleaning up brownfields sites can assist planners in making decisions at various stages of the project. An understanding of land use and industrial processes conducted in the past at a site can help the planner to conceptualize the site and identifymore » likely areas of contamination that may require cleanup. Numerous resources are suggested to facilitate characterization of the site and consideration of cleanup technologies.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flynn, Karen; McCormick, Matt
Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level,more » and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)« less
Harclerode, Melissa A; Macbeth, Tamzen W; Miller, Michael E; Gurr, Christopher J; Myers, Teri S
2016-12-15
As the environmental remediation industry matures, remaining sites often have significant underlying technical challenges and financial constraints. More often than not, significant remediation efforts at these "complex" sites have not achieved stringent, promulgated cleanup goals. Decisions then have to be made about whether and how to commit additional resources towards achieving those goals, which are often not achievable nor required to protect receptors. Guidance on cleanup approaches focused on evaluating and managing site-specific conditions and risks, rather than uniformly meeting contaminant cleanup criteria in all media, is available to aid in this decision. Although these risk-based cleanup approaches, such as alternative endpoints and adaptive management strategies, have been developed, they are under-utilized due to environmental, socio-economic, and risk perception barriers. Also, these approaches are usually implemented late in the project life cycle after unsuccessful remedial attempts to achieve stringent cleanup criteria. In this article, we address these barriers by developing an early decision framework to identify if site characteristics support sustainable risk management, and develop performance metrics and tools to evaluate and implement successful risk-based cleanup approaches. In addition, we address uncertainty and risk perception challenges by aligning risk-based cleanup approaches with the concepts of risk management and sustainable remediation. This approach was developed in the context of lessons learned from implementing remediation at complex sites, but as a framework can, and should, be applied to all sites undergoing remediation. Copyright © 2016 Elsevier Ltd. All rights reserved.
U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROMINE, L.D.
2006-02-01
The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is availablemore » to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.« less
Contaminated site cleanups involving complex activities may benefit from a detailed environmental footprint analysis to inform decision-making about application of suitable best management practices for greener cleanups.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawless, W.F.
2013-07-01
Citizen involvement in DOE's decision-making for the environmental cleanup from DOE's management of its nuclear wastes across the DOE complex has had a positive effect on the cleanup of its SRS site, characterized by an acceleration of cleanup not only for the Transuranic wastes at SRS, but also for DOE's first two closures of HLW tanks, both of which occurred at SRS. The Citizens around SRS had pushed successfully for the closures of Tanks 17 and 20 in 1997, becoming the first closures of HLW tanks under regulatory guidance in the USA. However, since then, HLW tank closures ceased duemore » to a lawsuit, the application of new tank clean-up technology, interagency squabbling between DOE and NRC over tank closure criteria, and finally and almost fatally, from budget pressures. Despite an agreement with its regulators for the closure of Tanks 18 and 19 by the end of calendar year 2012, the outlook in Fall 2011 to close these two tanks had dimmed. It was at this point that the citizens around SRS became reengaged with tank closures, helping DOE to reach its agreed upon milestone. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, S.Y.
2013-07-01
In August 2008, the U.S. Department of Homeland Security (DHS) issued its final Protective Action Guide (PAG) for radiological dispersal device (RDD) and improvised nuclear device (IND) incidents. This document specifies protective actions for public health during the early and intermediate phases and cleanup guidance for the late phase of RDD or IND incidents, and it discusses approaches to implementing the necessary actions. However, while the PAG provides specific guidance for the early and intermediate phases, it prescribes no equivalent guidance for the late-phase cleanup actions. Instead, the PAG offers a general description of a complex process using a site-specificmore » optimization approach. This approach does not predetermine cleanup levels but approaches the problem from the factors that would bear on the final agreed-on cleanup levels. Based on this approach, the decision-making process involves multifaceted considerations including public health, the environment, and the economy, as well as socio-political factors. In an effort to fully define the process and approach to be used in optimizing late-phase recovery and site restoration following an RDD or IND incident, DHS has tasked the NCRP with preparing a comprehensive report addressing all aspects of the optimization process. Preparation of the NCRP report is a three-year (2010-2013) project assigned to a scientific committee, the Scientific Committee (SC) 5-1; the report was initially titled, Approach to Optimizing Decision Making for Late- Phase Recovery from Nuclear or Radiological Terrorism Incidents. Members of SC 5-1 represent a broad range of expertise, including homeland security, health physics, risk and decision analysis, economics, environmental remediation and radioactive waste management, and communication. In the wake of the Fukushima nuclear accident of 2011, and guided by a recent process led by the White House through a Principal Level Exercise (PLE), the optimization approach has since been expanded to include off-site contamination from major nuclear power plant accidents as well as other nuclear or radiological incidents. The expanded application under the current guidance has thus led to a broadened scope of the report, which is reflected in its new title, Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents. The NCRP report, which is due for publication in 2013, will substantiate the current DHS guidance by clarifying and elaborating on the processes required for the development and implementation of procedures for optimizing decision making for late-phase recovery, enabling the establishment of cleanup goals on a site-specific basis. The report will contain a series of topics addressing important issues related to the long-term recovery from nuclear or radiological incidents. Special topics relevant to supporting the optimization of the decision-making process will include cost-benefit analysis, radioactive waste management, risk communication, stakeholder interaction, risk assessment, and decontamination approaches and techniques. The committee also evaluated past nuclear and radiological incidents for their relevance to the report, including the emerging issues associated with the Fukushima nuclear accident. Thus, due to the commonality of the late-phase issues (such as the potential widespread contamination following an event), the majority of the information pertaining to the response in the late-phase decision-making period, including site-specific optimization framework and approach, could be used or adapted for use in case of similar situations that are not due to terrorism, such as those that would be caused by major nuclear facility accidents or radiological incidents. To ensure that the report and the NCRP recommendations are current and relevant to the effective implementation of federal guidance, SC 5-1 has actively coordinated with the agencies of interest and other relevant stakeholders throughout the duration of the project. The resulting report will be an important resource to guide those involved in late-phase recovery efforts following a nuclear or radiological incident. (authors)« less
EPA Superfund Records of Decision (RODs) for Region 7: Iowa, Kansas, Missouri, and Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
EPA Superfund Records of Decision (RODs) for Region 10: Alaska, Idaho, Oregon, and Washington
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowry, R.C.
1998-12-31
The combined effects of federalism and interest group pluralism pose particularly difficult problems for hazardous waste siting and cleanup decisions. Most national environmental groups have only limited involvement in local hazardous waste politics, while local grass-roots advocates have very different interests and sometimes are pitted against one another. Both the Environmental protection Agency and the Department of energy recently have begun to use site-specific citizen advisory boards at cleanup sites. This approach appears to improve communications at some sites, but does not address the issues of ``not in my back yard`` politics and alleged inequitable exposure to hazardous wastes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
Risk-Based Decision Making Case Study: Application at a Superfund Cleanup.
ERIC Educational Resources Information Center
Blacker, Stanley; Goodman, Daniel
1994-01-01
Describes a case study comparing an integrated approach to Superfund cleanup with traditional approaches at a particular Superfund site. Emphasizes ways to save time and money while still achieving the desired risk reduction level. (LZ)
Considering Traditional Ecological Knowledge (TEK) During the Cleanup Process
This memorandum provides direction to improve the decision-making process as it relates to site assessment, characterization, and cleanup activities, to ensure EPA's Office of Land and Emergency Management is considering TEK when tribes provide it to EPA.
This document has been prepared by the Remediation Technologies Development Forum (RTDF) NAPL Cleanup Alliance to provide a guide to practicable and reasonable approaches for management of LNAPL petroleum hydrocarbons in the subsurface.
Review of State Soil Cleanup Levels for Dioxin (December 2009)
This final report summarizes a survey of state soil cleanup levels for dioxin and characterizes the science underlying these values. The objective of this project was to summarize existing state cleanup levels for dioxin in soil, together with their scientific bases where availa...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the amendments to the remedial action for the Springfield Township Dump site, Oakland County, Michigan. The amended remedial action changes the selected method of addressing PCB-laden soils and also changes certain soil and groundwater cleanup standards previously selected in the 1990 Record of Decision (ROD) to reflect current state standards: The groundwater and soil vapor extraction and treatment systems and the arsenic and lead groundwater cleanup standards identified as part of the selected remedy in the 1990 ROD and in the 1993 Explanation of Significant Difference remain unchanged.
Intergenerational equity and environmental restoration cleanup levels.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hocking, E. K.; Environmental Assessment
2001-01-01
The United States Department of Energy environmental restoration program faces difficult decisions about the levels of cleanup to be achieved at its many contaminated sites and has acknowledged the need for considering intergenerational equity in its decision making. Intergenerational equity refers to the fairness of access to resources across generations. Environmental restoration cleanup levels can have unintended and unfair consequences for future generations access to resources. The potentially higher costs associated with using low, non-risk-based cleanup levels for remediation may divert funding from other activities that could have a greater beneficial impact on future generations. Low, non-risk-based cleanup levels couldmore » also result in more damage to the nation's resources than would occur if a higher cleanup level were used. The loss or impairment of these resources could have an inequitable effect on future generations. However, intergenerational inequity could arise if sites are not completely restored and if access to and use of natural and cultural resources are unfairly limited as a result of residual contamination. In addition to concerns about creating possible intergenerational inequities related to selected cleanup levels, the tremendous uncertainties associated with sites and their restoration can lead site planners to rely on stewardship by default. An ill-conceived stewardship program can contribute to intergenerational inequity by limiting access to resources while passing on risks to future generations and not preparing them for those risks. This paper presents a basic model and process for designing stewardship programs that can achieve equity among generations.« less
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardisty, P.E.; Brown, A.
1996-12-01
The decision to remediate a contaminated site can be seen from the macroeconomic and microeconomic viewpoints. Macroeconomics can be used to plan and account for the overall cost of pollution as part of a firm`s production, and thus make overall decisions on the real cost of pollution and the level of clean-up which may be called for. Valuation of damaged resources, option values and intrinsic worth is an important part of this process. Once the decision to remediate has been taken, the question becomes how best to remediate. Microeconomic analysis deals with providing efficient allocative decisions for reaching specified goals.more » it is safe to say that cost is one of the single most important factors in site clean-up decision making. A basic rule of remediation is often taken to be the maximization of contaminant mass removed per dollar spent. However, remediation may also be governed by other objectives and constraints. In some situations, minimization of time, rather than cost, could be the constraint. Or perhaps the objective could be to achieve a set level of clean-up for the lowest possible cost, even if a large program would result in unit-cost reductions. Evaluation of the economics of a clean-up project is directly linked to the objectives of the site owner, and the constraints within which the remediation is to be performed. Economic analysis of remedial options for containment of a 350,000 L hydrocarbon spill migrating through fractured rock into a river in Alberta, Canada, clear direction to the site owner.« less
2017-01-01
the property, put final cleanup remedies in place before the property is transferred. However, under some circumstances the services may conduct an...early transfer before cleanup has been completed. When remedies are in place for addressing the contamination of a former installation or the...cleanup at BRAC installations will significantly increase due to the high cost of remediating emerging contaminants, primarily perfluorooctane
Report: Ombudsman Review of Bunker Hill and Coeur d’Alene Basin Superfund Actions
Report #2004-P-00009, March 24, 2004. EPA made a logical decision to first do cleanup work in the Bunker Hill Box and then later study areas outside the Box and pursue further cleanup work on specific targeted areas in the Coeur d'Alene Basin.
Science plus management equals successful remediation: A case study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buehlman, M.D.; Rogers, D.T.; Payne, F.C.
A case study involving a Brownfields site in southeastern Michigan clearly illustrates the elements of successful remediation. The site`s soil was contaminated with polychlorinated biphenyls (PCBs) and its groundwater with a variety of chlorinated solvents. The original estimate for remediation has exceeded $30 million. Several phases of investigation were conducted to evaluate the nature and sources of contaminants, the site`s hydrogeology, potential risks to human health and the environment, and feasible remedial technologies. Multiple cleanup criteria were established for different affected areas based on the results of the investigations, changes that were taking place with the state cleanup regulations andmore » standards and subsequent negotiations with state and federal regulators. Innovative remedial technologies were selected. The result was a remediation that met or exceeded all soil and groundwater cleanup objectives, was performed on schedule, and was highly cost-effective. The final cost was limited to $3 million--one-tenth of the original estimate. The success of this project involved meticulous scientific study and comprehensive understanding of applicable regulatory requirements and available remediation technologies. It also required effective project management to coordinate the multidisciplinary efforts involved and to maintain the constant vertical and horizontal communications necessary to ensure sound decisions at every step in the process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dowell, Jonathan; Franco, Joe
The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permittedmore » low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)« less
Development of comprehensive remediation standards at San Francisco International Airport
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grosso, A.; Lawler, M.; Meek, S.
1995-12-31
An ongoing expansion at the San Francisco International Airport (Airport) will result in a 35 percent increase in both terminal square footage and passenger handling capability. Facility relocation and construction are set to begin in October, 1995. Appropriate cleanup of contaminated soil and groundwater must be completed prior to this activity. Remedial goals for this major industrial facility must be protective of both human health and the environment. A risk-based strategy for the development of recommended cleanup objectives has been developed with the support of state regulatory agencies. This strategy includes Remediation Management Zones (RMZs), distinct regions at the Airportmore » with different remedial goals based on the associated risk to water quality, human health, and the environment. The RMZs and the final cleanup objectives for the Airport will be finalized by mid-1995, and will be used to govern future cleanup efforts at the site. This presentation will describe the history of the project, the determination of human health and ecological buffer zones, and the integration of these two concepts to produce cleanup objectives fully supported by the state regulatory authority.« less
Department of Defense Environmental Cleanup Cost Allowability Policy.
1994-12-01
The environment is directly affected by the industrial requirements and manufacturing processes necessary to provide those goods and services. As...and the industrial base. To begin the process , DCMC initiated the Environmental Initiatives Task Force Pilot Cost Allowance Program at five locations...policy covering environmental cleanup costs. Information will be provided to assist in the decision making process regarding the factors affecting the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denise Lach; Stephanie Sanford
2006-09-01
A consensus workshop was developed and convened with ten state regulators to characterize concerns regarding emerging bioremediation technology to be used to clean-up radionuclides and heavy metals in mixed wastes at US DOE sites. Two questions were explored: integrated questions: (1) What impact does participation in a consensus workshop have on the knowledge, attitudes, and practices of state regulators regarding bioremediation technology? (2) How effective is a consensus workshop as a strategy for eliciting and articulating regulators’ concerns regarding the use of bioremediation to clean up radionuclides and heavy metals in mixed wastes at U.S. Department of Energy Sites aroundmore » the county? State regulators met together for five days over two months to learn about bioremediation technology and develop a consensus report of their recommendations regarding state regulatory concerns. In summary we found that panel members: - quickly grasped the science related to bioremediation and were able to effectively interact with scientists working on complicated issues related to the development and implementation of the technology; - are generally accepting of in situ bioremediation, but concerned about costs, implementation (e.g., institutional controls), and long-term effectiveness of the technology; - are concerned equally about technological and implementation issues; and - believed that the consensus workshop approach to learning about bioremediation was appropriate and useful. Finally, regulators wanted decision makers at US DOE to know they are willing to work with DOE regarding innovative approaches to clean-up at their sites, and consider a strong relationship between states and the DOE as critical to any effective clean-up. They do not want perceive themselves to be and do not want others to perceive them as barriers to successful clean-up at their sites.« less
Rizzetti, Tiele M; de Souza, Maiara P; Prestes, Osmar D; Adaime, Martha B; Zanella, Renato
2018-04-25
In this study a simple and fast multi-class method for the determination of veterinary drugs in bovine liver, kidney and muscle was developed. The method employed acetonitrile for extraction followed by clean-up with EMR-Lipid® sorbent and trichloracetic acid. Tests indicated that the use of TCA was most effective when added in the final step of the clean-up procedure instead of during extraction. Different sorbents were tested and optimized using central composite design and the analytes determined by ultra-high-performance liquid chromatographic-tandem mass spectrometry (UHPLC-MS/MS). The method was validated according the European Commission Decision 2002/657 presenting satisfactory results for 69 veterinary drugs in bovine liver and 68 compounds in bovine muscle and kidney. The method was applied in real samples and in proficiency tests and proved to be adequate for routine analysis. Residues of abamectin, doramectin, eprinomectin and ivermectin were found in samples of bovine muscle and only ivermectin in bovine liver. Copyright © 2017 Elsevier Ltd. All rights reserved.
SMARTE: IMPROVING REVITALIZATION DECISIONS - OCTOBER 3, 2006
SMARTe (Sustainable Management Approaches and Revitalization Tools -electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and Revitalization (OBCR), the Interstate Tec...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ethan W. Brown
2001-09-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the period from April 1, 2001 through June 30, 2001, under the NGA grant.« less
The mating dance in cleanup recoveries: How to court responsible parties and in what court to do it
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, G.A.
1995-12-31
This article discusses the legalities which pertain specifically to hazardous waste cleanup. Topics of discussion include the following: threshold decisions: litigate or negotiate; forum issues--Federal or state court; claims in state court; and different types of damages and recovery. CERCLA is not the only grounds for recovery in environmental contamination cases. Common law and RCRA are also attractive.
This fact sheet was designed to be used by technical staff responsible for identifying and implementing flow and transport models to support cleanup decisions at hazardous and radioactive waste sites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-09-29
The 4-acre Cemetery Dump site is a former sand and gravel pit in Rose Township, Oakland County, Michigan. During the late 1960s or early 1970s, approximately 300 to 600 drums, containing paint sludges, solvents, PCBs, and oils, were illegally dumped and buried onsite. A 1985 Record of Decision (ROD) addressed the soil cleanup which included excavation and offsite disposal of visually-contaminated soil and drum fragments. Soil which was not visually contaminated was sampled and backfilled with clean soil into the excavated areas. Subsequent soil and ground water sampling indicated that zinc contaminants in the ground water exceed the Federal secondarymore » MCL, a nonenforceable standard based on taste and odor, not protection of health. Zinc contamination, however, is most likely a result of monitoring well construction materials. No other contaminants exceed Federal or State environmental standards.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehto, J.; Ikaeheimonen, T.K.; Salbu, B.
The fallout from a major nuclear accident at a nuclear plant may result in a wide-scale contamination of the environment. Cleanup of contaminated areas is of special importance if these areas are populated or cultivated. All cleanup measures generate high amounts of radioactive waste, which have to be treated and disposed of in a safe manner. Scenarios assessing the amounts and activity concentrations of radioactive wastes for various cleanup measures after severe nuclear accidents have been worked out for urban, forest and agricultural areas. These scenarios are based on contamination levels and ares of contaminated lands from a model accident,more » which simulates a worst case accident at a nuclear power plant. Amounts and activity concentrations of cleanup wastes are not only dependent on the contamination levels and areas of affected lands, but also on the type of deposition, wet or dry, on the time between the deposition and the cleanup work, on the season, at which the deposition took place, and finally on the level of cleanup work. In this study practically all types of cleanup wastes were considered, whether or not the corresponding cleanup measures are cost-effective or justified. All cleanup measures are shown to create large amounts of radioactive wastes, but the amounts, as well as the activity concentrations vary widely from case to case.« less
40 CFR 761.298 - Decisions based on PCB concentration measurements resulting from sampling.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Decisions based on PCB concentration... Cleanup and On-Site Disposal of Bulk PCB Remediation Waste and Porous Surfaces in Accordance With § 761.61(a)(6) § 761.298 Decisions based on PCB concentration measurements resulting from sampling. (a) For...
Estimate of the Potential Amount of Low-Level Waste from the Fukushima Prefecture - 12370
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, Carolyn; Olson, Eric A.J.; Elmer, John
2012-07-01
The amount of waste generated by the cleanup of the Fukushima Prefecture (Fukushima-ken) following the releases from the Fukushima Daiichi nuclear power plant accident (March 2011) is dependent on many factors, including: - Contamination amounts; - Cleanup levels determined for the radioisotopes contaminating the area; - Future land use expectations and human exposure scenarios; - Groundwater contamination considerations; - Costs and availability of storage areas, and eventually disposal areas for the waste; and - Decontamination and volume reduction techniques and technologies used. For the purposes of estimating these waste volumes, Fukushima-ken is segregated into zones of similar contamination level andmore » expected future use. Techniques for selecting the appropriate cleanup methods for each area are shown in a decision tree format. This approach is broadly applied to the 20 km evacuation zone and the total amounts and types of waste are estimated; waste resulting from cleanup efforts outside of the evacuation zone is not considered. Some of the limits of future use and potential zones where residents must be excluded within the prefecture are also described. The size and design of the proposed intermediate storage facility is also discussed and the current situation, cleanup, waste handling, and waste storage issues in Japan are described. The method for estimating waste amounts outlined above illustrates the large amount of waste that could potentially be generated by remediation of the 20 km evacuation zone (619 km{sup 2} total) if the currently proposed cleanup goals are uniformly applied. The Japanese environment ministry estimated in early October that the 1 mSv/year exposure goal would make the government responsible for decontaminating about 8,000 km{sup 2} within Fukushima-ken and roughly 4,900 km{sup 2} in areas outside the prefecture. The described waste volume estimation method also does not give any consideration to areas with localized hot spots. Land use and area dose rate estimates for the 20 km evacuation zone indicate there are large areas where doses to the public can be mitigated through methods other than removal and disposal of soil and other wastes. Several additional options for waste reduction can also be considered, including: - Recycling/reusing or disposing of as municipal waste material that can be unconditionally cleared; - Establishing additional precautionary (e.g., liners) and monitoring requirements for municipal landfills to dispose of some conditionally-cleared material; and - Using slightly-contaminated material in construction of reclamations, banks and roads. Waste estimates for cleanup will continue to evolve as decontamination plans are drafted and finalized. (authors)« less
SAMPLING PROTOCOLS TO SUPPORT CLEANUP DECISIONS FOR CONTAMINANTS IN GROUND WATER
The ability to make reliable decisions about the extent of subsurface contamination and approaches to restoration of contaminated ground water is dependent on the development of an accurate conceptual site model (CSM). The accuracy of the CSM is dependent on the quality of site ...
SMARTE: IMPROVING REVITALIZATION DECISIONS (CINCINNATI, OHIO)
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the remedial action selected to cleanup groundwater contaminant at the Bee Cee Manufacturing site in Malden, Missouri. The remedy selected to remediate contaminated groundwater at the Bee Cee Manufacturing site is natural attenuation, groundwater monitoring and institutional controls.
Extent and Degree of Shoreline Oiling: Deepwater Horizon Oil Spill, Gulf of Mexico, USA
Michel, Jacqueline; Owens, Edward H.; Zengel, Scott; Graham, Andrew; Nixon, Zachary; Allard, Teresa; Holton, William; Reimer, P. Doug; Lamarche, Alain; White, Mark; Rutherford, Nicolle; Childs, Carl; Mauseth, Gary; Challenger, Greg; Taylor, Elliott
2013-01-01
The oil from the 2010 Deepwater Horizon spill in the Gulf of Mexico was documented by shoreline assessment teams as stranding on 1,773 km of shoreline. Beaches comprised 50.8%, marshes 44.9%, and other shoreline types 4.3% of the oiled shoreline. Shoreline cleanup activities were authorized on 660 km, or 73.3% of oiled beaches and up to 71 km, or 8.9% of oiled marshes and associated habitats. One year after the spill began, oil remained on 847 km; two years later, oil remained on 687 km, though at much lesser degrees of oiling. For example, shorelines characterized as heavily oiled went from a maximum of 360 km, to 22.4 km one year later, and to 6.4 km two years later. Shoreline cleanup has been conducted to meet habitat-specific cleanup endpoints and will continue until all oiled shoreline segments meet endpoints. The entire shoreline cleanup program has been managed under the Shoreline Cleanup Assessment Technique (SCAT) Program, which is a systematic, objective, and inclusive process to collect data on shoreline oiling conditions and support decision making on appropriate cleanup methods and endpoints. It was a particularly valuable and effective process during such a complex spill. PMID:23776444
The ability to make reliable decisions about the extent of subsurface contamination and approaches to restoration of contaminated ground water is dependent on the development of an accurate conceptual site model (CSM). The accuracy of the CSM is dependent on the quality of site ...
40 CFR 761.298 - Decisions based on PCB concentration measurements resulting from sampling.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Decisions based on PCB concentration measurements resulting from sampling. 761.298 Section 761.298 Protection of Environment ENVIRONMENTAL... Cleanup and On-Site Disposal of Bulk PCB Remediation Waste and Porous Surfaces in Accordance With § 761...
40 CFR 761.298 - Decisions based on PCB concentration measurements resulting from sampling.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Decisions based on PCB concentration measurements resulting from sampling. 761.298 Section 761.298 Protection of Environment ENVIRONMENTAL... Cleanup and On-Site Disposal of Bulk PCB Remediation Waste and Porous Surfaces in Accordance With § 761...
40 CFR 761.298 - Decisions based on PCB concentration measurements resulting from sampling.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Decisions based on PCB concentration measurements resulting from sampling. 761.298 Section 761.298 Protection of Environment ENVIRONMENTAL... Cleanup and On-Site Disposal of Bulk PCB Remediation Waste and Porous Surfaces in Accordance With § 761...
40 CFR 761.298 - Decisions based on PCB concentration measurements resulting from sampling.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Decisions based on PCB concentration measurements resulting from sampling. 761.298 Section 761.298 Protection of Environment ENVIRONMENTAL... Cleanup and On-Site Disposal of Bulk PCB Remediation Waste and Porous Surfaces in Accordance With § 761...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berman, D.W.; Allen, B.C.; Van Landingham, C.B.
1998-12-31
The decision rules commonly employed to determine the need for cleanup are evaluated both to identify conditions under which they lead to erroneous conclusions and to quantify the rate that such errors occur. Their performance is also compared with that of other applicable decision rules. The authors based the evaluation of decision rules on simulations. Results are presented as power curves. These curves demonstrate that the degree of statistical control achieved is independent of the form of the null hypothesis. The loss of statistical control that occurs when a decision rule is applied to a data set that does notmore » satisfy the rule`s validity criteria is also clearly demonstrated. Some of the rules evaluated do not offer the formal statistical control that is an inherent design feature of other rules. Nevertheless, results indicate that such informal decision rules may provide superior overall control of error rates, when their application is restricted to data exhibiting particular characteristics. The results reported here are limited to decision rules applied to uncensored and lognormally distributed data. To optimize decision rules, it is necessary to evaluate their behavior when applied to data exhibiting a range of characteristics that bracket those common to field data. The performance of decision rules applied to data sets exhibiting a broader range of characteristics is reported in the second paper of this study.« less
SMARTE: IMPROVING REVITALIZATION DECISIONS - PRESENTATION TO THE BOSS FORUM, MAY 4, 2006
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup an...
40 CFR 300.440 - Procedures for planning and implementing off-site response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... under section 311 of the Clean Water Act where the release poses an immediate and significant threat to... to CERCLA wastes from cleanup actions based on CERCLA decision documents signed or consent decrees lodged after October 17, 1986 (“post-SARA CERCLA wastes”) as well as those based on CERCLA decision...
Environmental Response Laboratory Network (ERLN) Overview
The Environmental Response Laboratory Network provides Federal, State, and local decision-makers with reliable, high quality analytical data used to identify chemical, biological, and radiological contaminants collected in support of response and cleanup.
Restoring public trust while tearing down site in rural Ohio
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Jerry; Wagner, Jeffrey; Connell, Judy
2007-07-01
In the mid-1980's, the impact of three decades of uranium processing near rural Fernald, Ohio, 18 miles northwest of Cincinnati, became the centre of national public controversy. When a series of incidents at the uranium foundry brought to light the years of contamination to the environment and surrounding farmland communities, local citizens' groups united and demanded a role in determining the plans for cleaning up the site. One citizens' group, Fernald Residents for Environmental Safety and Health (FRESH), formed in 1984 following reports that nearly 300 pounds of enriched uranium oxide had been released from a dust-collector system, and threemore » off-property wells south of the site were contaminated with uranium. For 22 years, FRESH monitored activities at Fernald and participated in the decision-making process with management and regulators. The job of FRESH ended on 19 January this year when the Fernald Site was declared clean of all nuclear contamination and open to public access. It marked the end of a remarkable turnaround in public confidence and trust that had attracted critical reports from around the world. When personnel from Fluor arrived in 1992, the management team thought it understood the issues and concerns of each stakeholder group, and was determined to implement the decommissioning scope of work aggressively, confident that stakeholders would agree with its plans. This approach resulted in strained relationships with opinion leaders during the early months of Fluor's contract. To forge better relationships, the U.S. Department of Energy (DOE) who owns the site, and Fluor embarked on three new strategies based on engaging citizens and interested stakeholder groups in the decision-making process. The first strategy was opening communication channels with site leadership, technical staff, and regulators. This strategy combined a strong public-information program with two-way communications between management and the community, soliciting and encouraging stakeholder participation early in the decision-making process. Fluor's public-participation strategy exceeded the 'check-the-box' approach common within the nuclear-weapons complex, and set a national standard that stands alone today. The second stakeholder-engagement strategy sprang from mending fences with the regulators and the community. The approach for disposing low-level waste was a 25-year plan to ship it off the site. Working with stakeholders, DOE and Fluor were able to convince the community to accept a plan to safely store waste permanently on site, which would save 15 years of cleanup and millions of dollars in cost. The third strategy addressed the potentially long delays in finalizing remedial action plans due to formal public comment periods and State and Federal regulatory approvals. Working closely with the U.S. and Ohio Environmental Protection Agencies (EPA) and other stakeholders, DOE and Fluor were able to secure approvals of five Records of Decision on time - a first for the DOE complex. Developing open and honest relationships with union leaders, the workforce, regulators and community groups played a major role in DOE and Fluor cleaning up and closing the site. Using lessons learned at Fernald, DOE was able to resolve challenges at other sites, including worker transition, labour disputes, and damaged relationships with regulators and the community. It took significant time early in the project to convince the workforce that their future lay in cleanup, not in holding out hope for production to resume. It took more time to repair relationships with Ohio regulators and the local community. Developing these relationships over the years required constant, open communications between site decision makers and stakeholders to identify issues and to overcome potential barriers. Fluor's open public-participation strategy resulted in stakeholder consensus of five remedial-action plans that directed Fernald cleanup. This strategy included establishing a public-participation program that emphasized a shared-decision making process and abandoned the government's traditional, non-participatory 'Decide, Announce, Defend' approach. Fernald's program became a model within the DOE complex for effective public participation. Fluor led the formation of the first DOE site-specific advisory board dedicated to remediation and closure. The board was successful at building consensus on critical issues affecting long-term site remediation, such as cleanup levels, waste disposal and final land use. Fluor created innovative public outreach tools, such as 'Cleanopoly', based on the Monopoly game, to help illustrate complex concepts, including risk levels, remediation techniques, and associated costs. These innovative tools helped DOE and Fluor gain stakeholder consensus on all cleanup plans. To commemorate the outstanding commitment of Fernald stakeholders to this massive environmental-restoration project, Fluor donated $20,000 to build the Weapons to Wetlands Grove overlooking the former 136-acre production area. The grove contains 24 trees, each dedicated to '[a] leader(s) behind the Fernald cleanup'. Over the years, Fluor, through the Fluor Foundation, also invested in educational and humanitarian projects, contributing nearly $2 million to communities in southwestern Ohio, Kentucky and Indiana. Further, to help offset the economic impact of the site's closing to the community, DOE and Fluor promoted economic development in the region by donating excess equipment and property to local schools and townships. This paper discusses the details of the public-involvement program - from inception through maturity - and presents some lessons learned that can be applied to other similar projects. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The purpose of this decision document is to present an amendment to the Record of Decision (ROD) for the Moss-American Site, which is located in Milwaukee, Wisconsin. The ROD amendment for the Moss-American site has three principal components: (1) changes in soil treatment technology, (2) potential changes in cleanup standards, and (3) changes in cover design and requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Jacobs, Raymer J.E.
2008-06-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-01-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in the EM 2006 cleanup plans and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from October 1, 1997 through December 31, 1997, under the NGA project. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE activities in the area of the Hazardous Waste Identification Rule, and DOE's proposed National Dialogue.« less
Shen, Aijin; Wei, Jie; Yan, Jingyu; Jin, Gaowa; Ding, Junjie; Yang, Bingcheng; Guo, Zhimou; Zhang, Feifang; Liang, Xinmiao
2017-03-01
An orthogonal two-dimensional solid-phase extraction strategy was established for the selective enrichment of three aminoglycosides including spectinomycin, streptomycin, and dihydrostreptomycin in milk. A reversed-phase liquid chromatography material (C 18 ) and a weak cation-exchange material (TGA) were integrated in a single solid-phase extraction cartridge. The feasibility of two-dimensional clean-up procedure that experienced two-step adsorption, two-step rinsing, and two-step elution was systematically investigated. Based on the orthogonality of reversed-phase and weak cation-exchange procedures, the two-dimensional solid-phase extraction strategy could minimize the interference from the hydrophobic matrix existing in traditional reversed-phase solid-phase extraction. In addition, high ionic strength in the extracts could be effectively removed before the second dimension of weak cation-exchange solid-phase extraction. Combined with liquid chromatography and tandem mass spectrometry, the optimized procedure was validated according to the European Union Commission directive 2002/657/EC. A good performance was achieved in terms of linearity, recovery, precision, decision limit, and detection capability in milk. Finally, the optimized two-dimensional clean-up procedure incorporated with liquid chromatography and tandem mass spectrometry was successfully applied to the rapid monitoring of aminoglycoside residues in milk. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
EPA waiver of ground water cleanup standards in NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hess, A.A.
1995-11-01
EPA may invoke a technical impracticability (TI) waiver at a site when the Agency determines that it is technically impracticable from an engineering perspective to attain cleanup standards within a reasonable time period. The October 6, 1994 TI waiver of ground water cleanup standards at the G.E./Moreau Superfund Site in New York is the first post-Record of Decision (ROD) TI waiver granted by EPA since issuance of the September 1993 guidance on technical impracticability of ground water restoration. In the 1987 ROD, EPA selected natural gradient flushing and treatment as the ground water remedy and estimated that TCE-contaminated ground watermore » within the unconsolidated aquifer at the Site would be restored to drinking water quality within decades. EPA`s subsequent reevaluation showed that cleanup of the ground water would take 200 years or more, regardless of the remedial technology employed, due to the presence of site-specific physical and chemical factors that limit the effectiveness of ground water remediation technologies. Following public participation activities, EPA issued the TI waiver as an Explanation of Significant Differences (ESD) to the ROD. The ESD revised the time frame expected for ground water restoration but did not reduce or change any of the required cleanup actions.« less
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
Addressing Community Concerns about Lead Contamination in Soil: Insights for Site Cleanup
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finster, M.E.
2008-07-01
Health risks associated with contaminated sites are a key driver for cleanup decisions and determinations about alternate land use of areas released to the public, particularly in heavily populated metropolitan areas. To guide risk management and future use decisions at contaminated sites, insights can be gained from community-based research. These evaluations can also help ensure that assessments and decisions developed for urban sites consider input received from community members. In order to evaluate the potential risk due to consumption of plants home-grown in lead-contaminated soil, a pilot study was conducted over a period of two summers in a Chicago, ILmore » neighborhood. This survey included analyses of lead concentrations in a convenience sampling of edible fruits, vegetables, and herbs and also examined how the sample preparation method affected the lead concentrations detected in plant materials. A pattern of lead transfer from soil through the root to the stem and leaves of garden crops was found. This pattern is a concern particularly for plants in which the roots, stems, stalks, or leaves are consumed. Analyses of fruiting vegetables indicated that concentrations were below the limit of detection. Depending on the soil lead level and specific plant, the contamination found in some leafy vegetables and herbs may exceed the body's daily excretion rate and could contribute to the total body burden of lead, especially in children. Finally, washing edible portions did not necessarily eliminate the risk, indicating that the lead was located both on and in the plant tissue. This research was conducted in coordination with health experts from the community, and local citizens were involved in discussions on the research and implications for their health protection measures. In certain residential locations, identifying and understanding the potential source of lead contamination provides information for the community such that simple measures can be applied for protecting their health (e.g., creating a raised bed, or relocating garden areas). Similar practical measures can be applied for more complex sites, to frame land use decisions in a way that can account for localized hot spots without precluding all options of interest to projected future users. (authors)« less
Ground Water Sampling for Metal Analyses
Filtration of ground-water samples for metals analysis is an issue identified by the Forum as a concern of Superfund decision-makers. Inconsistency in EPA Superfund cleanup ractices occurs where one EPA Region implements a remedial action based on...
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
CERT tribal internship program. Final intern report: Lewis Yellowrobe, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-09-01
The purpose of this internship was to present state legislators with the history and an overview of the Department of Energy`s policies towards occupational health and safety during cleanup of nuclear weapons production facilities. The approach used library research and phone and personal interviews to acquire information on DOE policies. This intern report contains the final report to legislators entitled ``Environmental restoration and waste management: Worker health and safety concerns during nuclear facility cleanup.`` It presents the current status of DOE occupational health and safety at production facilities, Congressional intent, past DOE occupational policies, and options for state legislators tomore » use to get involved with DOE policy direction.« less
TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANUP OF AUTOMOTIVE RECYCLING BROWNFIELDS
The guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically automotive recycling sites. The document helps users to understand...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
Computer Models Used to Support Cleanup Decision Making at Hazardous and Radioactive Waste Sites
This report is a product of the Interagency Environmental Pathway Modeling Workgroup. This report will help bring a uniform approach to solving environmental modeling problems common to site remediation and restoration efforts.
Decontamination issues for chemical and biological warfare agents: how clean is clean enough?
Raber, E; Jin, A; Noonan, K; McGuire, R; Kirvel, R D
2001-06-01
The objective of this assessment is to determine what level of cleanup will be required to meet regulatory and stakeholder needs in the case of a chemical and/or biological incident at a civilian facility. A literature review for selected, potential chemical and biological warfare agents shows that dose information is often lacking or controversial. Environmental regulatory limits or other industrial health guidelines that could be used to help establish cleanup concentration levels for such agents are generally unavailable or not applicable for a public setting. Although dose information, cleanup criteria, and decontamination protocols all present challenges to effective planning, several decontamination approaches are available. Such approaches should be combined with risk-informed decision making to establish reasonable cleanup goals for protecting health, property, and resources. Key issues during a risk assessment are to determine exactly what constitutes a safety hazard and whether decontamination is necessary or not for a particular scenario. An important conclusion is that cleanup criteria are site dependent and stakeholder specific. The results of a modeling exercise for two outdoor scenarios are presented to reinforce this conclusion. Public perception of risk to health, public acceptance of recommendations based on scientific criteria, political support, time constraints, and economic concerns must all be addressed in the context of a specific scenario to yield effective and acceptable decontamination.
SMARTE: HELPING COMMUNITIES OVERCOME OBSTACLES TO REVITALIZATION - JUNE 28, 2006
SMARTe (Sustainable Management Approaches and Revitalization Tools -electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and Revitalization (OBCR), the Interstate Tec...
Chemical Mixtures and Epidemiologic Fundamentals for Risk Assessment Applications
Risk management options are increasingly being considered early in the risk assessment process to help scope the considerations and bound the inherent complexities related to potential exposures, risk and future clean-up decisions (including acceptable pollutant levels) related t...
GROUND-WATER SAMPLING AND GEOPHYSICAL METHODS DEVELOPMENT AND EVALUATION
Inadequate site characterization and a lack of knowledge of subsurface contaminant distributions (particularly Non-Aqueous Phase Liquids [NAPLs]) hinder our ability to make good decisions on remediation options and to conduct adequate cleanup efforts at contaminated sites. Non-i...
Henry, Heather; Naujokas, Marisa F.; Attanayake, Chammi; ...
2015-07-03
Recently the Centers for Disease Control and Prevention lowered the blood Pb reference value to 5 μg/dL. The lower reference value combined with increased repurposing of postindustrial lands are heightening concerns and driving interest in reducing soil Pb exposures. As a result, regulatory decision makers may lower residential soil screening levels (SSLs), used in setting Pb cleanup levels, to levels that may be difficult to achieve, especially in urban areas. This study discusses challenges in remediation and bioavailability assessments of Pb in urban soils in the context of lower SSLs and identifies research needs to better address those challenges. Althoughmore » in situ remediation with phosphate amendments is a viable option, the scope of the problem and conditions in urban settings may necessitate that SSLs be based on bioavailable rather than total Pb concentrations. However, variability in soil composition can influence bioavailability testing and soil amendment effectiveness. Finally, more data are urgently needed to better understand this variability and increase confidence in using these approaches in risk-based decision making, particularly in urban areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henry, Heather; Naujokas, Marisa F.; Attanayake, Chammi
Recently the Centers for Disease Control and Prevention lowered the blood Pb reference value to 5 μg/dL. The lower reference value combined with increased repurposing of postindustrial lands are heightening concerns and driving interest in reducing soil Pb exposures. As a result, regulatory decision makers may lower residential soil screening levels (SSLs), used in setting Pb cleanup levels, to levels that may be difficult to achieve, especially in urban areas. This study discusses challenges in remediation and bioavailability assessments of Pb in urban soils in the context of lower SSLs and identifies research needs to better address those challenges. Althoughmore » in situ remediation with phosphate amendments is a viable option, the scope of the problem and conditions in urban settings may necessitate that SSLs be based on bioavailable rather than total Pb concentrations. However, variability in soil composition can influence bioavailability testing and soil amendment effectiveness. Finally, more data are urgently needed to better understand this variability and increase confidence in using these approaches in risk-based decision making, particularly in urban areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in DOE's Accelerating Cleanup: Paths to Closure strategy and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from December 31, 1997 through April 30, 1998 under the NGA project. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and provided ongoing support to state-DOE interactions in preparation for the March 30-31, 1998 NGA Federal Facilities Compliance Task Force Meeting with DOE. maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE's Environmental Management Budget, and DOE's proposed Intersite Discussions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann M. Beauchesne
1999-04-30
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex; Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis; Interstate waste and materials shipments; and Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from February 1, 1999, through April 30, 1999, under the NGA grant. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, external regulation of DOE; and EM Integration activities; and continued to serve as a liaison between the NGA FFCA Task Force states and the Department.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-07-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in DOE's Accelerating Cleanup: Paths to Closure strategy and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from April 30, 1998 through June 30, 1998 under the NGA project. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and provided ongoing support to state-DOE interactions. maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE's Environmental Management Budget, and DOE's proposed Intersite Discussions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann B. Beauchesne
1998-09-30
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: (1) Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; (2) Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; (3) Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect onmore » individual sites in the complex; (4) Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis; (5) Interstate waste and materials shipments; and (6) Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from June 1, 1998 through September 30, 1998, under the NGA grant. The work accomplished by the NGA project team during the past four months can be categorized as follows: (1) maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; (2) maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, external regulation of DOE; and EM Integration activities; and (3) continued to serve as a liaison between the NGA FFCA Task Force states and the Department.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann M. Beauchesne
1999-07-30
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex; Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis; Interstate waste and materials shipments; and Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from May 1, 1999, through July 30, 1999, under the NGA grant. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, external regulation of DOE; and continued to facilitate interactions between the states and DOE to develop a foundation for an ongoing substantive relationship between the Governors of key states and Secretary Richardson.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann M. Beauchesne
1999-01-31
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: (1) Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; (2) Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; (3) Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect onmore » individual sites in the complex; (4) Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis; (5) Interstate waste and materials shipments; and (6) Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from October 1, 1998 through January 31, 1999, under the NGA grant. The work accomplished by the NGA project team during the past four months can be categorized as follows: (1) maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; (2) maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, external regulation of DOE; and EM Integration activities; and (3) continued to serve as a liaison between the NGA FFCA Task Force states and the Department.« less
This fact sheet summarizes the report by a joint Interagency Environmental Pathway Modeling Working Group. It was designed to be used by technical staff responsible for identifying and implementing flow and transport models to support cleanup decisions.
NATIONAL QA STANDARD FOR ENVIRONMENTAL PROGRAMS FOR HAZARDOUS WASTE MANAGEMENT ACTIVITIES
The clean-up of Federally-owned facilities contaminated by mixtures of hazardous chemical and radioactive wastes involves critical decisions based on environmental data. ederal agencies are currently using several different standards or sets of requirements, including U.S. Enviro...
DEVELOPMENT OF A NATIONAL CONSENSUS STANDARD FOR QUALITY ASSURANCE FOR ENVIRONMENTAL PROGRAMS
Decisions on where and how to clean-up Federally-owned facilities contaminated by mixtures of hazardous chemical and radioactive wastes requires that quality environmental data be obtained. he Federal Government currently using several different standards or sets of requirements ...
Survey of Costs Arising From Potential Radionuclide Scattering Events
DOE Office of Scientific and Technical Information (OSTI.GOV)
Luna, R.E.; Pe, Ph.D.; Yoshimura, H.R.
The potential effects from scattering radioactive materials in public places include health, social, and economic consequences. These are substantial consequences relative to potential terror activities that include use of radioactive material dispersal devices (RDDs). Such an event with radionuclides released and deposited on surfaces outside and inside people's residences and places of work, commerce, and recreation will require decisions on how to recover from the event. One aspect of those decisions will be the cost to clean up the residual radioactive contamination to make the area functional again versus abandonment and/or razing and rebuilding. Development of cleanup processes have beenmore » the subject of experiment from the beginning of the nuclear age, but formalized cost breakdowns are relatively rare and mostly applicable to long term releases in non-public sites. Pre-event cleanup cost estimation of cost for cleanup of radioactive materials released to the public environment is an issue that has seen sporadic activity over the last 20 to 30 years. This paper will briefly review several of the more important efforts to estimate the costs of remediation or razing and reconstruction of radioactively contaminated areas. The cost estimates for such recoveries will be compared in terms of 2005 dollars for the sake of consistency. Dependence of cost estimates on population density and needed degree of decontamination will be shown to be quite strong in the overall presentation of the data. (authors)« less
Joseph, George; Devi, Ranjani; Marley, Elaine C; Leeman, David
2018-05-01
Single- and multilaboratory testing data have provided systematic scientific evidence that a simple, selective, accurate, and precise method can be used as a potential candidate reference method for dispute resolution in determining total biotin in all forms of infant, adult, and/or pediatric formula. Using LC coupled with immunoaffinity column cleanup extraction, the method fully meets the intended purpose and applicability statement in AOAC Standard Method Performance Requirement 2014.005. The method was applied to a cross-section of infant formula and adult nutritional matrixes, and acceptable precision and accuracy were established. The analytical platform is inexpensive, and the method can be used in almost any laboratory worldwide with basic facilities. The immunoaffinity column cleanup extraction is the key step to successful analysis.
Navarro, P; Bustamante, J; Vallejo, A; Prieto, A; Usobiaga, A; Arrasate, S; Anakabe, E; Puy-Azurmendi, E; Zuloaga, O
2010-09-17
The determination of target analytes such as nonyl- and octylphenols and 17beta-estradiol in fish homogenate require of solid-liquid extraction step. In this work microwave-assisted extraction (MAE) and focused-ultrasound liquid extraction (FUSLE) were studied as two different alternatives for extraction of the target compounds in zebrafish (Danio rerio) homogenate. In this work solid phase extraction (SPE) using 5-g and 10-g Florisil cartridges and gel permeation chromatography (GPC) were studied for the clean-up of the MAE and FUSLE extracts due to the non-selective extraction step. Although good recoveries were obtained both for SPE (106% and 126% range) and GPC (79% and 100% range) clean-up procedures, cleaner chromatograms were obtained after SPE and finally 5-g Florisil cartridges were tested since no improvement was observed when 10-g Florisil cartridges were used. Under optimized clean-up conditions, MAE and FUSLE provided comparable results for 4nOP and NP, while more accurate results were obtained for 4tOP and E2 after FUSLE. Finally, the method was applied to the determination of alkylphenols and 17beta-estradiol in zebrafish homogenate that had been exposed to known concentrations of the target analytes. In the case of alkylphenols two different isomers of nonyl- and octylphenol (4-(3',6'-dimethyl-3'-hepthyl)phenol, 363-NP, and 4-(3'-methyl-3'-hepthyl)phenol, 33-OP) were studied. 2010 Elsevier B.V. All rights reserved.
Using Models to Assist with Clean-up Decisions at Contaminated Sites
The attached products make up the training package Dr. John McKernan will provide regarding Remediation/Rehabilitation of contaminated sites at the 2018 CEECHE Workshop on Environmental Health. Two posters and 2 presentations are attached. The workshop will provide training on t...
This fact sheet summarizes the findings of a report by a joint Interagency Environmental Pathway Modeling Working Group. It was designed to be used by technical staff responsible for implementing flow and transport models to support cleanup decisions.
SUPERFUND GROUND WATER ISSUE: GROUND WATER SAMPLING FOR METALS ANALYSES
Filtration of ground-water samples for metals analysis is an issue identified by the Forum as a concern of Superfund decision-makers. Inconsistency in EPA Syperfund cleanup pracices occurs where one EPA Region implements a remedial action based on unfiltered ground-water samples,...
GY SAMPLING THEORY IN ENVIRONMENTAL STUDIES 2: SUBSAMPLING ERROR MEASUREMENTS
Sampling can be a significant source of error in the measurement process. The characterization and cleanup of hazardous waste sites require data that meet site-specific levels of acceptable quality if scientifically supportable decisions are to be made. In support of this effort,...
This document assists Brownfields grantees and other decision makers as they assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and and cleanup.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-28
The 200-acre Kin-Buc Landfill consists of several inactive disposal areas and is located in Edison Township, Middlesex County, New Jersey. Land use in the area is predominantly industrial and commercial, with some residences within 2 miles north of the site. No drinking water supply wells are located within a 2-mile radius of the site. As a result of an oil spill in 1976, EPA conducted an investigation of the property. In 1980, clean-up activities were initiated under the Clean Water Act and included removal, treatment, and disposal of leachate and drummed waste. The ROD addresses a final remedy for OU2more » consisting of the sediment and groundwater in the Edmonds Creek wetlands area, Mill Brook/Martins Creek, Mound B, and the low-lying area. The primary contaminants of concern affecting the sediment and ground water are VOCs, including benzene and xylenes; other organics, including PAHs, PCBs, and pesticides; and metals, including arsenic and lead. The selected remedy for the site are included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document is an amendment to the Record of Decision (ROD) signed September 28, 1990 (PB94-921479) and presents the new selected remedial action for cleanup of contaminated shallow soils at OU5 at the Sand Creek Industrial Superfund Site. OU5 is located immediately north of 52nd and Dahlia Street in Commerce City, Colorado. Based on new technical data and cost information obtained subsequent to the September 1990 ROD, EPA has reconsidered its decision to employ soil washing and incineration of the generated residuals as a source control measure for OU5.
This fact sheet summarizes the findings of a report drafted by a joint Interagency Environmental Pathway Modeling Working Group. It is to be used by technical staff responsible for implementing flow and transport models to support cleanup decisions.
Guidance for Brownfields grantees and other decision makers to assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and cleanup of brownfields.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the selected remedial action for the T.H. Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. Operable Unit Two (OU2) encompasses the remediation of the contaminated soils and sediments on the Site, and also establishes the performance standards for the groundwater remedy. Upon reaching the cleanup standards for groundwater at an established point(s) of compliance, the groundwater pumping system will be shut down.
Vinyl Chloride: A Case Study of Data Suppression and Misrepresentation
Sass, Jennifer Beth; Castleman, Barry; Wallinga, David
2005-01-01
When the U.S. Environmental Protection Agency (EPA) finalized its 2000 update of the toxicological effects of vinyl chloride (VC), it was concerned with two issues: the classification of VC as a carcinogen and the numerical estimate of its potency. In this commentary we describe how the U.S. EPA review of VC toxicology, which was drafted with substantial input from the chemical industry, weakened safeguards on both points. First, the assessment downplays risks from all cancer sites other than the liver. Second, the estimate of cancer potency was reduced 10-fold from values previously used for environmental decision making, a finding that reduces the cost and extent of pollution reduction and cleanup measures. We suggest that this assessment reflects discredited scientific practices and recommend that the U.S. EPA reverse its trend toward ever-increasing collaborations with the regulated industries when generating scientific reviews and risk assessments. PMID:16002366
Code of Federal Regulations, 2011 CFR
2011-07-01
.... Explanation of Significant Differences (ESD) means the document issued by the agency leading a cleanup that describes to the public significant changes made to a Record of Decision after the ROD has been signed. The ESD must also summarize the information that led to the changes and affirm that the revised remedy...
ESTIMATING THE EXPOSURE POINT CONCENTRATION TERM USING PROUCL, VERSION 3.0
In superfund and RCRA Projects of the U.S. EPA, cleanup, exposure, and risk assessment decisions are often made based upon the mean concentrations of the contaminants of potential concern (COPC). A 95% upper confidence limit (UCL) of the population mean is used to estimate the e...
Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer
This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.Only NPL sites have been included in Cleanups in My Community thus far. EPA maintains the NPL, which identifies for the States and the public those sites or other releases that appear to warrant remedial (long term) actions. These NPL sites fall into the following categories:Proposed: Sites may be proposed for the NPL and then may be placed on the NPL as final or be removed from the Proposed NPL.Final: Those sites placed on the NPL are called final, and for these sites, a cleanup remedy is selected and implemented. However, it may be several years after construction of the remedy is completed before the hazardous substances are completely cleaned up or controlled in place.Deleted: After the clean up process is complete, and appropriate reviews confirm the area is cleaned up or the hazards are controlled, sites can be deleted from the NPL.For more information on the data provided through this web service, please see the processing steps below, and see more information here: https://www.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann M. Beauchesne
2000-01-01
Through the National Governors Association (NGA) project ``Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex; Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis; Interstate waste and materials shipments; and Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the period from October 1, 1999 through January 31, 2000, under the NGA grant. The work accomplished by the NGA project team during the past three months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; convened and facilitated the October 6--8 NGA FFCA Task Force Meeting in Oak Ridge, Tennessee; maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, external regulation of DOE; and continued to facilitate interactions between the states and DOE to develop a foundation for an ongoing substantive relationship between the Governors of key states and the Department.« less
SMARTE: IMPROVING REVITALIZATION DECISIONS - OCT. 19, 2006 FOR ITRC
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and Revitaliz...
SMARTE: SUSTAINABLE MANAGEMENT APPROACHES AND REVITALIZATION TOOLS ELECTRONIC (CINCINNATI, OHIO)
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
The development of effective in situ and on-site bioremediation technologies can facilitate the cleanup of chemically-contaminated soil sites. Knowledge of biodegradation kinetics and bioavailability of organic pollutants can facilitate decisions on the efficacy of in situ and o...
Jank, Louise; Martins, Magda Targa; Arsand, Juliana Bazzan; Hoff, Rodrigo Barcellos; Barreto, Fabiano; Pizzolato, Tânia Mara
2015-01-01
This study describes the development and validation procedures for scope extension of a method for the determination of β-lactam antibiotic residues (ampicillin, amoxicillin, penicillin G, penicillin V, oxacillin, cloxacillin, dicloxacillin, nafcillin, ceftiofur, cefquinome, cefoperazone, cephapirine, cefalexin and cephalonium) in bovine milk. Sample preparation was performed by liquid-liquid extraction (LLE) followed by two clean-up steps, including low temperature purification (LTP) and a solid phase dispersion clean-up. Extracts were analysed using a liquid chromatography-electrospray-tandem mass spectrometry system (LC-ESI-MS/MS). Chromatographic separation was performed in a C18 column, using methanol and water (both with 0.1% of formic acid) as mobile phase. Method validation was performed according to the criteria of Commission Decision 2002/657/EC. Main validation parameters such as linearity, limit of detection, decision limit (CCα), detection capability (CCβ), accuracy, and repeatability were determined and were shown to be adequate. The method was applied to real samples (more than 250) and two milk samples had levels above maximum residues limits (MRLs) for cloxacillin - CLX and cefapirin - CFAP.
Plumlee, Geoffrey S.; Morman, Suzette A.; San Juan, Carma
2013-01-01
If human populations are successfully evacuated prior to the tsunami arrival, there would be no or limited numbers of drownings, other casualties, or related injuries, wounds, and infections. Immediately after the tsunami, human populations away from the inundation zone could be transiently exposed to airborne gases, smoke, and ash from tsunamigenic fires. Cleanup and disposal, particularly of hazardous materials, would pose substantial logistical challenges and economic costs. Given the high value of the coastal residential and commercial properties in the inundation zone, it can be postulated that there would be substantial insurance claims for environmental restoration, mold mitigation, disposal of debris that contains hazardous materials, and costs of litigation related to environmental liability. Post-tsunami cleanup, if done with appropriate mitigation (for example, dust control), personal protection, and disposal measures, would help reduce the potential for cleanup-worker and resident exposures to toxicants and pathogens in harbor waters, debris, soils, ponded waters, and buildings. A number of other steps can be taken by governments, businesses, and residents to help reduce the environmental impacts of tsunamis and to recover more quickly from these environmental impacts. For example, development of State and local policies that foster rapid assessment of potential contamination, as well as rapid decision making for disposal options should hazardous debris or sediment be identified, would help enhance recovery by speeding cleanup.
Pedersen, Kristine Bondo; Kirkelund, Gunvor M; Ottosen, Lisbeth M; Jensen, Pernille E; Lejon, Tore
2015-01-01
Chemometrics was used to develop a multivariate model based on 46 previously reported electrodialytic remediation experiments (EDR) of five different harbour sediments. The model predicted final concentrations of Cd, Cu, Pb and Zn as a function of current density, remediation time, stirring rate, dry/wet sediment, cell set-up as well as sediment properties. Evaluation of the model showed that remediation time and current density had the highest comparative influence on the clean-up levels. Individual models for each heavy metal showed variance in the variable importance, indicating that the targeted heavy metals were bound to different sediment fractions. Based on the results, a PLS model was used to design five new EDR experiments of a sixth sediment to achieve specified clean-up levels of Cu and Pb. The removal efficiencies were up to 82% for Cu and 87% for Pb and the targeted clean-up levels were met in four out of five experiments. The clean-up levels were better than predicted by the model, which could hence be used for predicting an approximate remediation strategy; the modelling power will however improve with more data included. Copyright © 2014 Elsevier B.V. All rights reserved.
Cleanup/stimulation of a horizontal wellbore using propellants. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rougeot, J.E.; Lauterbach, K.A.
1993-01-01
This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellants. The Wilson 25 is a Bartlesville Sand well located in the Flatrock Field, Osage County, Oklahoma. The Wilson 25 was drilled to determine if horizontal drilling could be used as a means to economically recover primary oil that had been left in place in a mostly abandoned oil field because of the adverse effects of water coning. Pump testing of the Wilson 25 horizontal well bore before cleanup or stimulation produced 6 barrels of oil and .84 barrels of water per day. The high percentage ofmore » daily oil production to total daily fluid production indicated that the horizontal well bore had accessed potentially economical oil reserves if the fluid production rate could be increased by performing a cleanup/stimulation treatment. Propellants were selected as an inexpensive means to stimulate and cleanup the near well bore area in a uniform manner. The ignition of a propellant creates a large volume of gas which penetrates the formation, creating numerous short cracks through which hydrocarbons can travel into the well bore. More conventional stimulation/cleanup techniques were either significantly more expensive, less likely to treat uniformly, or could not be confined to the near well bore area. Three different propellant torpedo designs were tested with a total of 304` of horizontal well bore being shot and producible. The initial test shot caused 400` of the horizontal well bore to become plugged off, and subsequently it could not be production tested. The second and third test shots were production tested, with the oil production being increased 458% and 349%, respectively, on a per foot basis. The Wilson 25 results indicate that a propellant shot treatment is an economically viable means to cleanup/stimulate a horizontal well bore.« less
Oellig, Claudia
2016-05-06
Propolis is a very complex mixture of substances that is produced by honey bees and is known to be a rather challenging matrix for residue analysis. Besides resins, flavonoids and phenols, high amount of wax is co-extracted resulting in immense matrix effects. Therefore a suitable clean-up is crucial and indispensable. In this study, a reliable solid phase extraction (SPE) clean-up was developed for pesticide residue analysis in propolis. The clean-up success was quickly and easily monitored by high-performance thin-layer chromatography with different detection possibilities. The final method consists of the extraction of propolis with acetonitrile according to the QuEChERS method followed by an effective extract purification on dual-layer SPE cartridges with spherical hydrophobic polystyrene-divinylbenzene resin/primary secondary amine as sorbent and a mixture of toluene/acetone (95:5, v/v) for elution. Besides fat-soluble components like waxes, flavonoids, and terpenoids, more polar compounds like organic acids, fatty acids, sugars and anthocyanins were also removed to large extent. Method performance was assessed by recovery experiments at spiking levels of 0.5 and 1mg/kg (n=5) for fourteen pesticides that are relevant for propolis. Mean recoveries determined by HPLC-MS against solvent standards were between 40 and 101%, while calculation against matrix-matched standards provided recoveries of 79-104%. Precision of recovery, assessed by relative standard deviations, were below 9%. Thus, the developed dual-layer SPE clean-up enables the reliable pesticide residue analysis in propolis and provides a suitable alternative to time-consuming clean-up procedures proposed in literature. Copyright © 2016 Elsevier B.V. All rights reserved.
Delatour, Thierry; Périsset, Adrienne; Goldmann, Till; Riediker, Sonja; Stadler, Richard H
2004-07-28
An improved sample preparation (extraction and cleanup) is presented that enables the quantification of low levels of acrylamide in difficult matrixes, including soluble chocolate powder, cocoa, coffee, and coffee surrogate. Final analysis is done by isotope-dilution liquid chromatography-electrospray ionization tandem mass spectrometry (LC-MS/MS) using d3-acrylamide as internal standard. Sample pretreatment essentially encompasses (a) protein precipitation with Carrez I and II solutions, (b) extraction of the analyte into ethyl acetate, and (c) solid-phase extraction on a Multimode cartridge. The stability of acrylamide in final extracts and in certain commercial foods and beverages is also reported. This approach provided good performance in terms of linearity, accuracy and precision. Full validation was conducted in soluble chocolate powder, achieving a decision limit (CCalpha) and detection capability (CCbeta) of 9.2 and 12.5 microg/kg, respectively. The method was extended to the analysis of acrylamide in various foodstuffs such as mashed potatoes, crisp bread, and butter biscuit and cookies. Furthermore, the accuracy of the method is demonstrated by the results obtained in three inter-laboratory proficiency tests. Copyright 2004 American Chemical Society
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This Record of Decision (ROD) presents the selected remedial action plan for the Ohio River Park Superfund Site (the Site) in Allegheny County, Pennsylvania. The remedial action plan in this document is presented as the permanent remedy for controlling the groundwater at the Site. This remedy is comprised of: monitoring of natural attenuation processes to measure changes in contaminant concentrations in groundwater plume at the Site until the cleanup levels are achieved; deed restriction preventing residential use of groundwater at the Site.
Recommendations for Ensuring Long-Term Engagement of Communities if Gulf Coast Ecosystem Restoration
This report contains advice and recommendations about how the Agency can best engage minority, low-income, and tribal/indigenous communities for input on decisions about Gulf Coast restoration plans, particularly with respect to the impacts of such plans on permitting (such as wetlands restoration, equitable development, revitalization, cleanups, and sustainable energy).
SMARTe (Sustainable Management Approaches and Revitalization Tools -electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and...
SMARTe (Sustainable Management Approaches and Revitalization Tools -electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and...
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
Recreation Use of the Ocala National Forest in Florida
George A. James; Robert A. Harper
1965-01-01
Forest land managers charged with operating and developing an outdoor recreation complex--whether large or small, public or private - constantly face a host of management decisions. What are my cleanup and maintenance needs? What uses and facilities should be provided? Should I expand? Should I add new units? These questions are not easy to answer. And before sound...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-26
..., the remedy chosen for the soils and sediments was failing to clean the soils and sediments up to the required performance standards. EPA issued an Amended Record of Decision for the soils and sediments... then became necessary to amend the 1998 Decree to include the revised soils and sediment cleanup under...
SMARTe (Sustainable Management Approaches and Revitalization Tools-electronic) is a web-based decision support tool being developed by the Office of Research and Development (ORD) in partnership with the Office of Brownfields Cleanup and ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document amends the September 29, 1995, Record of Decision (ROD) Amendment for the H. Brown Co., Inc. site, in Walker, Michigan. The major components of the selected remedy include: Consolidating contaminated surface soil and sediment requiring cleanup onto the H. Brown property (2200 Turner Avenue N.W.); Redevelopment of the site, by private parties, with warehousing facilities constructed above the contaminated soil; A cover system comprised of clean fill to develop appropriate grades and elevations, concrete slab foundations, asphalt parking areas, and landscaped areas; Long-term maintenance of the cover system to ensure that the cover will continue to preventmore » direct contact with contaminated soil and minimize infiltration of precipitation; Long-term monitoring of the shallow and intermediate aquifers to monitor the effectiveness of the remedy; Monitoring and/or treatment of landfill gas; Restricting the use of the land and the groundwater; Demolishing on-site buildings to accommodate redevelopment; and Cleanup standards for soil will remain the same as in the 1992 ROD. The purpose of this ROD Amendment is to facilitate the re-development of the H. Brown Co., Inc. Site, and if re-development does not occur or proves to be unsuccessful then the remedy selected in the September 29, 1995 ROD Amendment will be implemented.« less
Large-Scale Urban Decontamination; Developments, Historical Examples and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rick Demmer
2007-02-01
Recent terrorist threats and actual events have lead to a renewed interest in the technical field of large scale, urban environment decontamination. One of the driving forces for this interest is the real potential for the cleanup and removal of radioactive dispersal device (RDD or “dirty bomb”) residues. In response the U. S. Government has spent many millions of dollars investigating RDD contamination and novel decontamination methodologies. Interest in chemical and biological (CB) cleanup has also peaked with the threat of terrorist action like the anthrax attack at the Hart Senate Office Building and with catastrophic natural events such asmore » Hurricane Katrina. The efficiency of cleanup response will be improved with these new developments and a better understanding of the “old reliable” methodologies. Perhaps the most interesting area of investigation for large area decontamination is that of the RDD. While primarily an economic and psychological weapon, the need to cleanup and return valuable or culturally significant resources to the public is nonetheless valid. Several private companies, universities and National Laboratories are currently developing novel RDD cleanup technologies. Because of its longstanding association with radioactive facilities, the U. S. Department of Energy National Laboratories are at the forefront in developing and testing new RDD decontamination methods. However, such cleanup technologies are likely to be fairly task specific; while many different contamination mechanisms, substrate and environmental conditions will make actual application more complicated. Some major efforts have also been made to model potential contamination, to evaluate both old and new decontamination techniques and to assess their readiness for use. Non-radioactive, CB threats each have unique decontamination challenges and recent events have provided some examples. The U. S. Environmental Protection Agency (EPA), as lead agency for these emergency cleanup responses, has a sound approach for decontamination decision-making that has been applied several times. The anthrax contamination at the U. S. Hart Senate Office Building and numerous U. S. Post Office facilities are examples of employing novel technical responses. Decontamination of the Hart Office building required development of a new approach for high level decontamination of biological contamination as well as techniques for evaluating the technology effectiveness. The World Trade Center destruction also demonstrated the need for, and successful implementation of, appropriate cleanup methodologies. There are a number of significant lessons that can be gained from a look at previous large scale cleanup projects. Too often we are quick to apply a costly “package and dispose” method when sound technological cleaning approaches are available. Understanding historical perspectives, advanced planning and constant technology improvement are essential to successful decontamination.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kamboj, Sunita; Durham, Lisa A.
A post-remediation radiological dose assessment was conducted for the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde Site by using the measured residual concentrations of the radionuclides of concern following the completion of the soils remedial action. The site’s FUSRAP-related contaminants of concern (COCs) are radionuclides associated with uranium processing activities conducted by the Manhattan Engineer District (MED) in support of the Nation’s early atomic energy and weapons program and include radium-226 (Ra-226), thorium-230 (Th-230), and total uranium (Utotal). Remedial actions to address Linde Site soils and structures were conducted in accordance with the Record of Decision for the Lindemore » Site, Tonawanda, New York (ROD) (USACE 2000a). In the ROD, the U.S. Army Corps of Engineers (USACE) determined that the cleanup standards found in Title 40, Part 192 of the Code of Federal Regulations (40 CFR Part 192), the standards for cleanup of uranium mill sites designated under the Uranium Mill Tailings Radiation Control Act (UMTRCA), and the Nuclear Regulatory Commission (NRC) standards for decommissioning of licensed uranium and thorium mills, found in 10 CFR Part 40, Appendix A, Criterion 6(6), are Applicable or Relevant and Appropriate Requirements (ARARs) for cleanup of MED-related contamination at the Linde Site. The major elements of this remedy will involve excavation of the soils with COCs above soil cleanup levels and placement of clean materials to meet the other criteria of 40 CFR Part 192.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haidar, S.; Rylance, M.; Tybero, G.
1996-12-31
Having completed both fracture treatments as discussed in a companion paper, this paper continues on to describe the post fracture shut-in, clean-up and well testing operations that took place on the Viking Wx exploration well 49/17-12. These operations involved the removal of Resin Coated Proppant (RCP) from the wellbore, via Coiled Tubing (CT), through the use of a specially designed jetting nozzle. The RCP pack stability at a concentration of 3.0 lb/ft{sup 2} (as per planned design) had already been tested in a flowback cell. The use of a Surface Read-Out (SRO) gauge, combined with gas, water and proppant flowmore » rates as well as the viscosity of fracturing fluids returns, enabled real time calculation of the drag forces, on the proppant pack, during clean-up. The flow rate, in the field, was controlled such that the calculated drag forces remained below those observed in the laboratory. Following the clean-up a flow and build-up test was conducted, to evaluate the fracture half length and fracture conductivity, from which a Pseudo-radial skin was calculated. The Non-Darcy effects in the fracture were also evaluated, and finally the short term and long term well deliverabilities were assessed.« less
ERIC Educational Resources Information Center
Cowles, Kathleen Letcher
Integrated Pest Management (IPM), a decision-making approach to pest control, is designed to help individuals decide if pest suppression treatments are necessary, when they should be initiated, where they should be applied, and what strategy/mix of tatics to use. IPM combines a variety of approaches with which to manage pests, including human…
Martins, Magda Targa; Barreto, Fabiano; Hoff, Rodrigo Barcelos; Jank, Louise; Arsand, Juliana Bazzan; Feijó, Tiago Correa; Schapoval, Elfrides Eva Scherman
2015-01-01
Antibacterials are widely used in veterinary medicine. Residues of these drugs can remain in food of animal origin, including bovine liver. This paper describes a fast and simple analytical method for the determination of quinolones and fluoroquinolones, tetracyclines and sulfonamides in bovine liver samples. Deuterated enrofloxacin, sulfapyridine and demeclocycline were used as internal standards. The homogenised liver samples were extracted with acidified acetonitrile. Steps of non-solid-phase extraction (SPE) clean-up and concentration were used in the presented method. The final extracts were analysed by sensitive and selective detection of all components in a single run using LC-MS/MS. Acceptable recoveries between 66% and 110% were obtained. Good linearity (r(2)) above 0.96, considering three different days, for all drugs was achieved in concentrations ranging from 0.0 to 2.0 × the maximum residue limit (MRL). Intraday precision with coefficient of variation (CV%) (n = 6) lower than 14.7% and inter-day precision lower than 18.8% in agreement with European Commission Decision 2002/657/EC were obtained in concentrations ranging from 0.5 to 1.5 MRL. Accuracy was between 86% and 110%. Limits of detection and quantitation, as well as decision limit (CCα) and detection capability (CCβ), were also evaluated.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... and sealed containers. 11. State-approved treatment facilities must be used to render infectious waste... actions, and potentially high clean-up costs. 12. Autoclave sterilization is the most common treatment for... 21008
A sustainable approach to controlling oil spills.
Al-Majed, Abdul Aziz; Adebayo, Abdulrauf Rasheed; Hossain, M Enamul
2012-12-30
As a result of the huge economic and environmental destruction from oil spills, studies have been directed at improving and deploying natural sorbents which are not only the least expensive but also the safest means of spill control. This research reviews the limitations and environmental impact of existing cleanup methods. It also justifies the need for concerted research effort on oil spill control using natural and sustainable technology concepts. The article proposes future guidelines for the development of a sustainable cleanup technology. Finally, guidelines for the development of a new technology for the Middle East are proposed, which is the use of an abundant resource--date palm fibers--for such techniques. Copyright © 2012 Elsevier Ltd. All rights reserved.
US DOE Perspectives on Advisory Board Effectiveness - 13539
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adler, David
2013-07-01
Federal missions on the Oak Ridge Reservation began with the Manhattan Project, and continues today with major facilities supporting the Nation's Science and National Security missions. While most of the land area on the Oak Ridge Reservation is free of environmental impacts from these activities, significant legacy contamination is associated with specific facilities and past waste management areas. In 1989, the Oak Ridge Reservation (ORR) was placed on National Priorities List, and DOE established its Office of Environmental Management that same year. Three years later, in 1992, the Federal Facility Agreement for the reservation was signed. Three years afterward, themore » Oak Ridge Site Specific Advisory Board was established to augment ongoing public involvement activities related to Oak Ridge Reservation cleanup activities. One of the early and most impactful decisions the board made was to organize the End Use Working Group. This broad-based group of board members, DOE representatives, and members of the public was formed in 1997 to study future uses for contaminated areas of the reservation. The group was instrumental in building consensus in the Oak Ridge community regarding the long-term end state of reservation lands. The group's recommendations were a fundamental input into Record's of Decision subsequently developed to establish cleanup requirements across the ORR, and they continue to influence decisions being made today. In developing its recommendations on end states, the End Use Working Group came to the realization that long-term stewardship of contaminated areas of the reservation would be necessary, in some cases in perpetuity. It was from this concept that the Oak Ridge SSAB's 15-year involvement in stewardship would begin. A stewardship committee formed by the End Use Working Group wrote Volume 1 of the Stakeholder Report on Stewardship. This document-and its companion Volume 2, which was written a year later-form a crucial foundation for stewardship planning in Oak Ridge and have been referenced around the DOE complex as other sites consider stewardship planning. From these two broad-based initiatives, the board's focus has evolved to increasingly hone in on more specific, project-based recommendations and initiatives. The Oak Ridge Reservation Site Specific Advisory Board has been a highly effective forum for soliciting community input on Oak Ridge Reservation cleanup. Experience in Oak Ridge indicates that the utility of Board recommendations is far higher when the Board is asked to focus on broad programmatic issues, and less useful when the Board attempts to provide advice and recommendations on matters related to technical or project management issues. In Oak Ridge the Board has helped shape the program on many levels including definition of end-state cleanup objectives, budget development, program sequencing, waste management, and decisions concerning preservation of history related to missions implemented on the Oak Ridge Reservation. (authors)« less
The mating dance in cleanup recoveries: How to court responsible parties and in what court to do it
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, G.A.
1996-12-31
CERCLA is not the only grounds for recovery in environmental contamination cases. Common law and RCRA claims are attractive, especially when petroleum contamination is at issue. Attention is focused on the following: threshold decisions (litigate or negotiate); forum issues (federal or state court); claims in state court; and different types of damages and recovery.
US EPA record of decision review for landfills: Sanitary landfill (740-G), Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-06-01
This report presents the results of a review of the US Environmental Protection Agency (EPA) Record of Decision System (RODS) database search conducted to identify Superfund landfill sites where a Record of Decision (ROD) has been prepared by EPA, the States or the US Army Corps of Engineers describing the selected remedy at the site. ROD abstracts from the database were reviewed to identify site information including site type, contaminants of concern, components of the selected remedy, and cleanup goals. Only RODs from landfill sites were evaluated so that the results of the analysis can be used to support themore » remedy selection process for the Sanitary Landfill at the Savannah River Site (SRS).« less
Gwack, Jin; Lee, Ju Hyung; Kang, Young Ah; Chang, Kyu-jin; Lee, Moo Sik; Hong, Jee Young
2012-01-01
Objectives This study was conducted to investigate acute health effects and its related factors among military personnel participating in the cleanup of the 2007 Hebei Spirit oil spill accident in Taean county, Korea. Methods We collected data on acute symptoms during the cleanup and their predictors using a self-administered questionnaire to 2624 military personnel. Selfreported symptoms included six neurologic symptoms, five respiratory symptoms, two dermatologic symptoms, three ophthalmic symptoms, and three general symptoms. Independent variables were demographic factors (gender, age, education level, and rank), health behavioral factors (smoking history and usage of the personal protective equipment such as masks and gloves), and occupational history such as where and for how long individuals participated in cleanup. Results The duration of work days was significantly associated with 17 acute symptoms except for itchiness and red skin.Working in Taean county also increased the risk of most acute symptoms except headache and back pain. In regard to personal protective equipment, wearing masks was mainly related to the development of respiratory symptoms such as sore throat and wearing other protective equipment was related to the development of sore throat, back pain, headache, and cough. Military personnel younger than 25 years reported 4.66 times more hot flushing and 5.39 times more itchiness than those older than 25 years. Conclusion It should be emphasized that for early-stage cleanup the number of workers should be minimized, sufficient personal protective equipment with approved quality for blocking noxious gas should be supplied, and systematic health care for the workers should be provided. Health effects could be diminished by providing adequate education regarding the appropriate use of protective equipment, especially to nonprofessionals such as residents and volunteers. To make disaster response expeditious, a national and regional preparedness plans and a professional response team for emergency environmental assessment and emergency action should be established beforehand to make prompt decisions. PMID:24159516
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
The Record of Decision Amendment (`ROD Amendment`) modifies the selected remedy described in the Revised Record of Decision for the Tyson`s Superfund Site (Site) issued by the U.S. Environmental Protection Agency (EPA) on March 31, 1988 (1988 Revised ROD - PB89-233894). In the 1988 Revised ROD, EPA selected a soil vapor extraction (SVE) remedy for lagoon area soils. The SVE system has removed approximately 200,000 pounds of volatile organic compounds (VOCs) from the lagoon area soils. Although several enhancements and modifications have been employed to improve performance, the SVE system will not achieve the cleanup standards specified in the 1988more » Revised ROD. The decision document presents the selected remedial action for the lagoon area soils at the Tyson`s Site.« less
North Slope (Wahluke Slope) expedited response action cleanup plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part ofmore » the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.« less
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
USDA-ARS?s Scientific Manuscript database
A rapid luminescence method was developed to screen residues of enrofloxacin (ENRO) and its metabolite, ciprofloxacin (CIPRO), in swine liver. Target analytes were extracted in acetonitrile-2.5% trifluoroacetic acid-NaCl, cleaned up by dispersive liquid-liquid microextraction (DLLME), and finally de...
Robotics crosscutting program: Technology summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Office of Environmental Management (EM) is responsible for cleaning up the legacy of radioactive and chemically hazardous waste at contaminated sites and facilities throughout the U.S. Department of Energy (DOE) nuclear weapons complex, preventing further environmental contamination, and instituting responsible environmental management. Initial efforts to achieve this mission resulted in the establishment of environmental restoration and waste management programs. However, as EM began to execute its responsibilities, decision makers became aware that the complexity and magnitude of this mission could not be achieved efficiently, affordably, safely, or reasonably with existing technology. Once the need for advanced cleanup technologies becamemore » evident, EM established an aggressive, innovative program of applied research and technology development. The Office of Technology Development (OTD) was established in November 1989 to advance new and improved environmental restoration and waste management technologies that would reduce risks to workers, the public, and the environment; reduce cleanup costs; and devise methods to correct cleanup problems that currently have no solutions. In 1996, OTD added two new responsibilities - management of a Congressionally mandated environmental science program and development of risk policy, requirements, and guidance. OTD was renamed the Office of Science and Technology (OST). This documents presents information concerning robotics tank waste retrieval overview, robotic chemical analysis automation, robotics decontamination and dismantlement, and robotics crosscutting and advanced technology.« less
Liu, Rentao; Jiang, Jiping; Guo, Liang; Shi, Bin; Liu, Jie; Du, Zhaolin; Wang, Peng
2016-06-01
In-depth filtering of emergency disposal technology (EDT) and materials has been required in the process of environmental pollution emergency disposal. However, an urgent problem that must be solved is how to quickly and accurately select the most appropriate materials for treating a pollution event from the existing spill control and clean-up materials (SCCM). To meet this need, the following objectives were addressed in this study. First, the material base and a case base for environment pollution emergency disposal were established to build a foundation and provide material for SCCM screening. Second, the multiple case-based reasoning model method with a difference-driven revision strategy (DDRS-MCBR) was applied to improve the original dual case-based reasoning model method system, and screening and decision-making was performed for SCCM using this model. Third, an actual environmental pollution accident from 2012 was used as a case study to verify the material base, case base, and screening model. The results demonstrated that the DDRS-MCBR method was fast, efficient, and practical. The DDRS-MCBR method changes the passive situation in which the choice of SCCM screening depends only on the subjective experience of the decision maker and offers a new approach to screening SCCM.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beauchesne, A.M.
1997-12-31
Topics explored through this project include: decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites in the complex; changes to the FFCA site treatment plans as a result of proposals in the EM 2006 cleanup plans and contractor integration analysis; interstate waste and materials shipments; and reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes.more » The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE activities in the area of the Hazardous Waste Identification Rule, and DOE`s proposed National Dialogue.« less
Decision support tool for used oil regeneration technologies assessment and selection.
Khelifi, Olfa; Dalla Giovanna, Fabio; Vranes, Sanja; Lodolo, Andrea; Miertus, Stanislav
2006-09-01
Regeneration is the most efficient way of managing used oil. It saves money by preventing costly cleanups and liabilities that are associated with mismanagement of used oil, it helps to protect the environment and it produces a technically renewable resource by enabling an indefinite recycling potential. There are a variety of processes and licensors currently offering ways to deal with used oils. Selecting a regeneration technology for used oil involves "cross-matching" key criteria. Therefore, the first prototype of spent oil regeneration (SPORE), a decision support tool, has been developed to help decision-makers to assess the available technologies and select the preferred used oil regeneration options. The analysis is based on technical, economical and environmental criteria. These criteria are ranked to determine their relative importance for a particular used oil regeneration project. The multi-criteria decision analysis (MCDA) is the core of the SPORE using the PROMETHEE II algorithm.
Managing previously disposed waste to today's standards
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-01-01
A Radioactive Waste Management Complex (RWMC) was established at the Idaho National Engineering Laboratory (INEL) in 1952 for controlled disposal of radioactive waste generated at the INEL. Between 1954 and 1970 waste characterized by long lived, alpha emitting radionuclides from the Rocky Flats Plant was also buried at this site. Migration of radionuclides and other hazardous substances from the buried Migration of radionuclides and other hazardous substances from the buried waste has recently been detected. A Buried Waste Program (BWP) was established to manage cleanup of the buried waste. This program has four objectives: (1) determine contaminant sources, (2) determinemore » extent of contamination, (3) mitigate migration, and (4) recommend an alternative for long term management of the waste. Activities designed to meet these objectives have been under way since the inception of the program. The regulatory environment governing these activities is evolving. Pursuant to permitting activities under the Resource Conservation and Recovery Act (RCRA), the Department of Energy (DOE) and the Environmental Protection Agency (EPA) entered into a Consent Order Compliance Agreement (COCA) for cleanup of past practice disposal units at the INEL. Subsequent to identification of the RWMC as a release site, cleanup activities proceeded under dual regulatory coverage of RCRA and the Atomic Energy Act. DOE, EPA, and the State of Idaho are negotiating a RCRA/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interagency Agreement (IAG) for management of waste disposal sites at the INEL as a result of the November 1989 listing of the INEL on the National Priority List (NPL). Decision making for selection of cleanup technology will be conducted under the CERCLA process supplemented as required to meet the requirements of the National Environmental Policy Act (NEPA). 7 figs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, T. J.; MacVean, S. A.; Szlis, K. A.
2002-02-26
This paper describes the progress on cleanup of the West Valley Demonstration Project (WVDP), an environmental management project located south of Buffalo, NY. The WVDP was the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States (1966 to 1972). Former fuel reprocessing operations generated approximately 600,000 gallons of liquid high-level radioactive waste stored in underground tanks. The U.S. Congress passed the WVDP Act in 1980 (WVDP Act) to authorize cleanup of the 220-acre facility. The facility is unique in that it sits on the 3,345-acre Western New York Nuclear Service Center (WNYNSC), whichmore » is owned by New York State through the New York State Energy Research and Development Authority (NYSERDA). The U.S. Department of Energy (DOE) has overall responsibility for the cleanup that is authorized by the WVDP Act, paying 90 percent of the WVDP costs; NYSERDA pays 10 percent. West Valley Nuclear Services Company (WVNSCO) is the management contractor at the WVDP. This paper will provide a description of the many accomplishments at the WVDP, including the pretreatment and near completion of vitrification of all the site's liquid high-level radioactive waste, a demonstration of technologies to characterize the remaining material in the high-level waste tanks, the commencement of decontamination and decommissioning (D&D) activities to place the site in a safe configuration for long-term site management options, and achievement of several technological firsts. It will also include a discussion of the complexities involved in completing the WVDP due to the various agency interests that require integration for future cleanup decisions.« less
TECHNICAL AND REGULATORY CONSIDERATIONS IN USING FREIGHT CONTAINERS AS INDUSTRIAL PACKAGES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Opperman, E; Mark Hawk, M; Ron Natali, R
2007-10-16
The United States (US) Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programs. EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer-term activities necessary for the completion of the clean-up program. The packaging and transportation of contaminated demolition debris and low-level waste (LLW) materials in a safe and cost-effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's (DOT) Final Rulemore » on Hazardous Materials Regulation Final Rule issued January 26, 2004, included a new provision authorizing the use of Freight Containers (e.g., 20 and 40-foot ISO Containers) as Industrial Packages Type 1, 2, or 3 (IP-1, IP-2, and IP-3). This paper will discuss the technical and regulatory considerations in using these newly authorized and large packages for the packaging and transportation of LLW materials.« less
Villaverde-de-Sáa, Eugenia; Quintana, José Benito; Rodil, Rosario; Ferrero-Refojos, Raúl; Rubí, Elisa; Cela, Rafael
2012-01-01
Perfluorinated compounds (PFCs) have been used for over 40 years in different commercial and industrial applications mainly as surfactants and surface protectors and have become an important class of marine emerging pollutants. This study presents the development and validation of a new analytical method to determine the simultaneous presence of eight PFCs in different kinds of mollusks using matrix solid-phase dispersion (MSPD) followed by liquid chromatography-tandem mass spectrometry (LC-MS/MS). Simplicity of the analytical procedure, low volume of solvent and quantity of sample required, low global price, and integration of extraction and clean-up into a single step, are the most important advantages of the developed methodology. Solvent, solid support (dispersing agent), clean-up sorbent, and their amounts were optimized by means of an experimental design. In the final method, 0.5 g of sample are dispersed with 0.2 g of diatomaceous earth and transferred into a polypropylene syringe containing 4 g of silica as clean-up sorbent. Then, analytes are eluted with 20 mL of acetonitrile. The extract is finally concentrated to a final volume of 0.5 mL in methanol, avoiding extract dryness in order to prevent evaporation losses and injected in the LC-MS/MS. The combination of this MSPD protocol with LC-MS/MS afforded detection limits from 0.05 to 0.3 ng g(-1). Also, a good linearity was established for the eight PFCs in the range from limit of quantification (LOQ) to 500 ng mL(-1) with R(2) > 0.9917. The recovery of the method was studied with three types of spiked mollusk and was in the 64-126% range. Moreover, a mussel sample was spiked and aged for more than 1 month and analyzed by the developed method and a reference method, ion-pair extraction, for comparison, producing both methods statistically equal concentration values. The method was finally applied to the determination of PFCs in different kinds of mollusks revealing concentrations up to 8.3 ng g(-1) for perfluoroundecanoic acid.
NASA Astrophysics Data System (ADS)
Lucas, G.; Lénárt, C.; Solymosi, J.
2015-08-01
This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Anderson Development site is an active chemical manufacturing facility in Adrian, Lenawee County, Michigan. The site occupies approximately 12.5 acres within a 40-acre industrial park, which is surrounded by residential areas. Site features include several onsite buildings used for manufacturing, storage, laboratories, and offices, as well as a 0.5-acre former process wastewater pretreatment lagoon. From 1970 to 1979, the Anderson Development Corporation (ADC) produced specialty chemicals onsite including 4,4-methylene bis (2-chlororaniline) (MBOCA), a hardening agent for the production of polyurethane plastics. The ROD amends the 1990 ROD, which provided for treatment of the contaminated media using in-situ vitrification, andmore » documents the selection of low temperature thermal desorption (LTTD) as the preferred treatment technology. The selected amended remedial action for this site includes excavating and staging 3,000 to 4,000 tons of contaminated soil, clay, and lagoon sludge with MBOCA concentrations above the 1.6 mg/kg clean-up action level in an LTTD device.« less
Bramlitt, E T
1988-08-01
Cleanup is the act of making a contaminated site relatively free of Pu so it may be used without radiological safety restrictions. Contaminated ground is the focus of major cleanups. Cleanup traditionally involves determining Pu content of soil, digging up soil in which radioactivity exceeds guidelines, and relocating excised soil to a waste-disposal site. Alternative technologies have been tested at Johnston Atoll (JA), where there is as much as 100,000 m3 of Pu-contaminated soil. A mining pilot plant operated for the first 6 mo of 1986 and made 98% of soil tested "clean", from more than 40 kBq kg-1 (1000 pCi g-1) to less than about 500 Bq kg-1 (15 pCi g-1) by concentrating Pu in 2% of the soil. The pilot plant is now installed at the U.S. Department of Energy Nevada Test Site for evaluating cleanup of other contaminated soils and refining cleanup effectiveness. A full-scale cleanup plant has been programmed for JA in 1988. In this paper, previous cleanups are reviewed, and the mining endeavor at JA is detailed. "True soil cleanup" is contrasted with the classical "soil relocation cleanup." The mining technology used for Pu cleanup has been in use for more than a century. Mining for cleanup, however, is unique. It is envisioned as being prominent for radiological and other cleanups in the future.
2011-03-30
or remediation Used with regulatory values to determine cleanup levels Risk-based screening levels (aka PRGs, RBCs, RSLs) ►Screen sites early in...Final IRIS Values for Hydrogen Cyanide and Cyanide Salts (September 2010) New Oral noncancer RfD = 0.0006 mg/kg- day; male reproduction effects
Thermochemical Process Integration, Scale-Up, and Piloting | Bioenergy |
; represented by spheres of hydrogen and carbon monoxide, then to "Gas Cleanup, Solids Removal, Reforming ; represented by a gasoline dispenser nozzle. A green arrow of "Fast Pyrolysis" and blue arrows for Distillation," and finally to "Fuels," represented by a gasoline dispenser nozzle Variety of
2007-03-29
meaningful decisions about cleanup of contaminated sediments and hazardous waste disposal sites, accurately assess and implement control of...invertebrate species, and dietary benchmarks were set to the No Observed Adverse Effect Level (NOAEL) for the consumption of prey by black ducks , ospreys...prey equal to NOAEL assuming 100% of diet obtained from single prey. Footnoted references cited in Sample et al. 1996. 6 Black duck (DBDuck) NOAEL
Homeland Security Research Improves the Nation's Ability to ...
Technical Brief Homeland Security (HS) Research develops data, tools, and technologies to minimize the impact of accidents, natural disasters, terrorist attacks, and other incidents that can result in toxic chemical, biological or radiological (CBR) contamination. HS Research develops ways to detect contamination, sampling strategies, sampling and analytical methods, cleanup methods, waste management approaches, exposure assessment methods, and decision support tools (including water system models). These contributions improve EPA’s response to a broad range of environmental disasters.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
...Title I of the James Zadroga Health and Compensation Act of 2010 amended the Public Health Service Act (PHS Act) by adding Title XXXIII, which establishes the World Trade Center (WTC) Health Program. Sections 3311, 3312, and 3321 of Title XXXIII of the PHS Act require that the WTC Program Administrator develop regulations to implement portions of the WTC Health Program established within the Department of Health and Human Services (HHS). The WTC Health Program, which will be administered in part by the Director of the National Institute for Occupational Safety and Health (NIOSH), within the Centers for Disease Control and Prevention (CDC), will provide medical monitoring and treatment to eligible firefighters and related personnel, law enforcement officers, and rescue, recovery and cleanup workers who responded to the September 11, 2001, terrorist attacks in New York City, Shanksville, PA, and at the Pentagon, and to eligible survivors of the New York City attacks. This interim final rule establishes the processes by which eligible responders and survivors may apply for enrollment in the WTC Health Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions. This interim final rule also establishes a process for the certification of health conditions, and reimbursement rates for providers who provide initial health evaluations, treatment, and health monitoring.
Next steps in the development of ecological soil clean-up values for metals.
Wentsel, Randall; Fairbrother, Anne
2014-07-01
This special series in Integrated Environmental Assessment Management presents the results from 6 workgroups that were formed at the workshop on Ecological Soil Levels-Next Steps in the Development of Metal Clean-Up Values (17-21 September 2012, Sundance, Utah). This introductory article presents an overview of the issues assessors face when conducting risk assessments for metals in soils, key US Environmental Protection Agency (USEPA) documents on metals risk assessment, and discusses the importance of leveraging from recent major terrestrial research projects, primarily to address Registration, Evaluation, Authorization and Restriction of Chemical Substances (REACH) requirements in Europe, that have significantly advanced our understanding of the behavior and toxicity of metals in soils. These projects developed large data sets that are useful for the risk assessment of metals in soil environments. The workshop attendees met to work toward developing a process for establishing ecological soil clean-up values (Eco-SCVs). The goal of the workshop was to progress from ecological soil screening values (Eco-SSLs) to final clean-up values by providing regulators with the methods and processes to incorporate bioavailability, normalize toxicity thresholds, address food-web issues, and incorporate background concentrations. The REACH data sets were used by workshop participants as case studies in the development of the ecological standards for soils. The workshop attendees discussed scientific advancements in bioavailability, soil biota and wildlife case studies, soil processes, and food-chain modeling. In addition, one of the workgroups discussed the processes needed to frame the topics to gain regulatory acceptance as a directive or guidance by Canada, the USEPA, or the United States. © 2013 SETAC.
The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260
DOE Office of Scientific and Technical Information (OSTI.GOV)
Post, Thomas C.; Strom, Dean; Beulow, Laura
The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 andmore » 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)« less
Cyber Physical Intelligence for Oil Spills (CPI)
NASA Astrophysics Data System (ADS)
Lary, D. J.
2015-12-01
The National Academy of Sciences estimate 1.7 to 8.8 million tons of oil are released into global waters every year. The effects of these spills include dead wildlife, oil covered marshlands and contaminated water. Deepwater horizon cost approximately $50 billion and severely challenged response capabilities. In such large spills optimizing a coordinated response is a particular challenge. This challenge can be met in a revolutionary new way by using an objectively optimized Cyber Physical Decision Making System (CPS) for rapid response products and a framework for objectively optimized decision-making in an uncertain environment. The CPS utilizes machine learning for the processing of the massive real-time streams of Big Data from comprehensive hyperspectral remote sensing acquired by a team of low-cost robotic aerial vehicles, providing a real-time aerial view and stream of hyperspectral imagery from the near UV to the thermal infrared, and a characterization of oil thickness, oil type and oil weathering. The objective decision making paradigm is modeled on the human brain and provides the optimal course trajectory for response vessels to achieve the most expeditious cleanup of oil spills using the available resources. In addition, oil spill cleanups often involve surface oil burns that can lead to air quality issues. The aerial vehicles comprehensively characterize air quality in real-time, streaming location, temperature, pressure, humidity, the abundance of 6 criterion pollutants (O3, CO, NO, NO2, SO2, and H2S) and the full size distribution of airborne particulates. This CPS can be readily applied to other systems in agriculture, water conversation, monitoring of stream quality, air quality, diagnosing risk of wild fires, etc..
Nimick, David A.; Von Guerard, Paul
1998-01-01
From the Preface: There are thousands of abandoned or inactive mines on or adjacent to public lands administered by the U.S. Forest Service, Bureau of Land Management, and National Park Service. Mine wastes from many of these abandoned mines adversely affect resources on public lands. In 1995, an interdepartmental work group within the Federal government developed a strategy to address remediation of the many abandoned mines on public lands. This strategy is based on using a watershed approach to address the abandoned mine lands (AML) problem. The USGS, working closely with the Federal land-management agencies (FLMAs), is key for the success of this watershed approach. In support of this watershed approach, the USGS developed an AML Initiative with pilot studies in the Boulder River in Montana and the Animas River in Colorado. The goal of these studies is to design and implement a reliable strategy that will supply the scientific information to the FLMAs so that land managers can develop efficient and cost-effective remediation of AML. The symposium 'Science for Watershed Decisions on Abandoned Mine Lands: Review of Preliminary Results' held in Denver, Colorado, on February 4-5, 1998, provided the FLMAs a first look at the techniques, data, and interpretations being generated by the USGS pilot studies. This multidisciplined effort already is proving very valuable to land managers in making science-based AML cleanup decisions and will continue to be of increasing value as additional and more complete information is obtained. Ongoing interaction between scientists and land managers is essential to insure the efficient continuation and success of AML cleanup efforts.
Cleanups in My Community (CIMC) enables you to map and list hazardous waste cleanup locations and grant areas, and drill down to details about those cleanups and grants and other, related information.
Recent trends at the state and federal level in accelerating CERCLA clean-ups
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clegg, B.
Efforts at accelerating remedial action at the federal level focus on the following: the Superfund accelerated clean-up model (SCAM); Brownfields economic redevelopment initiative; guidance documents and policies; and collaboration with state voluntary cleanup programs. At the state level efforts involved in accelerating clean-ups include voluntary clean-up programs and Brownfields initiatives.
... National Center for Environmental Health (NCEH) Cleanup and Remediation Recommend on Facebook Tweet Share Compartir On This ... CDC and EPA on mold cleanup, removal and remediation. Cleanup information for you and your family Homeowner’s ...
Security Decision-Making in Pakistan
1980-09-01
intention of doing this job in worship, his 7life is a worship." But they are also reminded that: Sweat saves blood Blood saves life, Brain saves both...than anything else. In both Service First and Close Door, the military was called off the job before a thorough clean-up was made; in both cases, army...Some were opportunistic -59- job seekers but many were ir.tereztt;;a "- t i. military and were sincere nationalists. The official British analysIa of
Cleanups In My Community is a web app of hazardous waste cleanups for which EPA collects information, on maps and in lists, and to access additional information about those cleanups. This page describes and links to the application.
U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carey, Pat; Walker, Stuart
2008-01-15
This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirementsmore » designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around two main themes, building capacity in staff, and building capacity in Communities. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process.« less
Negotiation of a triparty agreement for mixed waste at Hanford
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGuire, H.E.; Powers, L.L.; Waite, J.L.
The US Department of Energy (DOE) is currently pursuing the activities necessary to obtain a final operating permit under the Resource Conservation and Recovery Act (RCRA) at Hanford. In addition, the Environmental Restoration Program has been established to conduct inactive site investigations and remedial actions as required under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The anticipated cost for the inactive site cleanup is significant. This was highlighted in a DOE report, where the expected cost for Hanford cleanup is shown as approximately $27 billion. It is imperative that the RCRA closure and corrective action activities be properlymore » integrated with the CERCLA actions to ensure site cleanup is performed in a consistent and cost-effective manner. It is believed that such an objective would best be served through an integrated triparty agreement between the Washington State Department of Ecology (WSDE), the US Environmental Protection Agency (EPA), and the DOE. The WSDE wants clear enforceability in any agreement and believes such enforceability can only be obtained through a judicial consent decree. A consent decree with WSDE for RCRA compliance would have to be separate from a CERCLA Sec. 120 federal facility agreement since EPA cannot enter into a consent decree with another federal agency.« less
NASA Technical Reports Server (NTRS)
Estep, Leland
2007-01-01
Presently, the BLM (Bureau of Land Management) has identified a multitude of abandoned mine sites in primarily Western states for cleanup. These sites are prioritized and appropriate cleanup has been called in to reclaim the sites. The task is great in needing considerable amounts of agency resources. For instance, in Colorado alone there exists an estimated 23,000 abandoned mines. The problem is not limited to Colorado or to the United States. Cooperation for reclamation is sought at local, state, and federal agency level to aid in identification, inventory, and cleanup efforts. Dangers posed by abandoned mines are recognized widely and will tend to increase with time because some of these areas are increasingly used for recreation and, in some cases, have been or are in the process of development. In some cases, mines are often vandalized once they are closed. The perpetrators leave them open, so others can then access the mines without realizing the danger posed. Abandoned mine workings often fill with water or oxygen-deficient air and dangerous gases following mining. If the workings are accidentally entered into, water or bad air can prove fatal to those underground. Moreover, mine residue drainage negatively impacts the local watershed ecology. Some of the major hazards that might be monitored by higher-resolution satellites include acid mine drainage, clogged streams, impoundments, slides, piles, embankments, hazardous equipment or facilities, surface burning, smoke from underground fires, and mine openings.
Fast-Track Cleanup at Closing DoD Installations
The Fast-Track Cleanup program strives to make parcels available for reuse as quickly as possible by the transfer of uncontaminated or remediated parcels, the lease of contaminated parcels where cleanup is underway, or the 'early transfer' of contaminated property undergoing cleanup.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Hazardous chemicals in the environment have received ever increasing attention in recent years. In response to ongoing problems with hazardous waste management, Congress enacted the Resource Conservation and Recovery Act (RCRA) in 1976. In 1980, Congress adopted the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA), commonly called Superfund to provide for emergency spill response and to clean up closed or inactive hazardous waste sites. Scientists and engineers have begun to respond to the hazardous waste challenge with research and development on treatment of waste streams as well as cleanup of polluted areas. The magnitude of the problem is justmore » now beginning to be understood. The U.S. Environmental Protection Agency (USEPA) National Priorities List as of September 13 1985, contained 318 proposed sites and 541 final sites (USEPA, 1985). Estimates of up to 30,000 sites containing hazardous wastes (1,200 to 2,000 of which present a serious threat to public health) have been made (Public Law 96-150). In addition to the large number of sites, the costs of cleanup using available technology are phenomenal. For example, a 10-acre toxic waste site in Ohio is to be cleaned up by removing chemicals from the site and treating the contaminated groundwater. The federal government has already spent more than $7 million to remove the most hazardous wastes and the groundwater decontamination alone is expected to take at least 10 years and cost $12 million. Another example of cleanup costs comes from the State of California Commission for Economic Development which predicts a bright economic future for the state except for the potential outlay of $40 billion for hazardous waste cleanup mandated by federal and state laws.« less
Rodriguez, E; Moreno-Bondi, M C; Marazuela, M D
2008-10-31
This paper describes a new method for the effective extraction, clean-up and chromatographic analysis of residues of four fluoroquinolones (ciprofloxacin, enrofloxacin, danofloxacin and sarafloxacin) in powdered infant formulae and follow-on preparations. Samples were reconstituted following the manufacturer's recommendations and treated with trichloroacetic acid in methanol 10% (w/v) for deproteinization. Two solid-phase extraction cartridges have been evaluated for sample clean-up and preconcentration, Strata Screen A and Strata X and the later provided the best recoveries for all the analytes tested. Chromatographic analysis has been carried out using a polar endcapped column (AQUA C(18)) and fluorescence detection, with lomefloxacin (LOME) as internal standard. Method validation has been performed according to European Commission Decision 2002/657/EC criteria, in terms of linearity, recovery, precision, specificity, decision limit (CC(alpha)) and detection capability (CC(beta)). Typical recoveries ranged between 70 and 110% at levels below and above the maximum residue limits of the target analytes in bovine milk, with an excellent intralab reproducibility (RSDs<7%). Matrix effects did not significantly affect method accuracy, as evidenced by analyzing different brands of milk. The method has been successfully applied to the analysis of 100 samples of infant and follow-on formulae of the Spanish and Latin American market, using LC-MS/MS as confirmatory technique.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiSalvo, Rick; Surovchak, Scott; Spreng, Carl
2013-07-01
Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less
HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY
DOE Office of Scientific and Technical Information (OSTI.GOV)
BERGMAN TB
2011-01-14
Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of themore » River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.« less
Moudgal, Chandrika J; Garrahan, Kevin; Brady-Roberts, Eletha; Gavrelis, Naida; Arbogast, Michelle; Dun, Sarah
2008-11-15
The toxicity value database of the United States Environmental Protection Agency's (EPA) National Homeland Security Research Center has been in development since 2004. The toxicity value database includes a compilation of agent property, toxicity, dose-response, and health effects data for 96 agents: 84 chemical and radiological agents and 12 biotoxins. The database is populated with multiple toxicity benchmark values and agent property information from secondary sources, with web links to the secondary sources, where available. A selected set of primary literature citations and associated dose-response data are also included. The toxicity value database offers a powerful means to quickly and efficiently gather pertinent toxicity and dose-response data for a number of agents that are of concern to the nation's security. This database, in conjunction with other tools, will play an important role in understanding human health risks, and will provide a means for risk assessors and managers to make quick and informed decisions on the potential health risks and determine appropriate responses (e.g., cleanup) to agent release. A final, stand alone MS ACESSS working version of the toxicity value database was completed in November, 2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, J.M.; Callahan, C.A.; Cline, J.F.
Bioassays were used in a three-phase research project to assess the comparative sensitivity of test organisms to known chemicals, determine if the chemical components in field soil and water samples containing unknown contaminants could be inferred from our laboratory studies using known chemicals, and to investigate kriging (a relatively new statistical mapping technique) and bioassays as methods to define the areal extent of chemical contamination. The algal assay generally was most sensitive to samples of pure chemicals, soil elutriates and water from eight sites with known chemical contamination. Bioassays of nine samples of unknown chemical composition from the Rocky Mountainmore » Arsenal (RMA) site showed that a lettuce seed soil contact phytoassay was most sensitive. In general, our bioassays can be used to broadly identify toxic components of contaminated soil. Nearly pure compounds of insecticides and herbicides were less toxic in the sensitive bioassays than were the counterpart commercial formulations. This finding indicates that chemical analysis alone may fail to correctly rate the severity of environmental toxicity. Finally, we used the lettuce seed phytoassay and kriging techniques in a field study at RMA to demonstrate the feasibility of mapping contamination to aid in cleanup decisions. 25 references, 9 figures, 9 tables.« less
Klein, Terry L.; Thamke, Joanna N.; Harper, David D.; Farag, Aïda M.; Nimick, David A.; Fey, David L.
2003-01-01
The upper Prickly Pear Creek watershed encompasses the upstream 15 miles of Prickly Pear Creek, south of Helena, Montana (fig. 1). The headwaters of Prickly Pear Creek and its tributaries (Beavertown Creek, Clancy Creek, Dutchman Creek, Golconda Creek, Lump Gulch, Spring Creek, and Warm Springs Creek) are primarily in the Helena National Forest, whereas the central part of the watershed primarily is within either Bureau of Land Management (BLM) or privately owned property. Three mining districts are present in the upper Prickly Pear Creek watershed: Alhambra, Clancy, and Colorado. Numerous prospects, adits, tailings piles, mills, dredge piles, and mines (mostly inactive) are located throughout the watershed. These districts contain polymetallic (Ag, Au, Cu, Pb, Zn) vein deposits and precious-metal (Au-Ag) vein and disseminated deposits that were exploited beginning in the 1860’s. Placer Au deposits in the major streams were extensively mined in the late 1800’s and early 1900’s.As part of a cooperative effort with Federal land management agencies, the U.S. Geological Survey (USGS) is currently using an integrated approach to investigate two mining impacted watersheds in the western United States (the Animas River in Colorado and the Boulder River in Montana). These studies provide the USDA Forest Service and BLM scientific data for implementing informed land-management decisions regarding cleanup of abandoned mine lands within each watershed. A similar integrated-science approach will be used to characterize the upper Prickly Pear Creek watershed with respect to water and streambed sediment chemistry, aquatic biota, and geologic framework. This integrated database presents data that will be used to identify important pathways of metals movement and biological impacts, thereby guiding resource management decisions of land-managers in several publications that are in preparation. Watershed-level characterization in terms of water quality, streambed sediment chemistry, and fish health will facilitate determinations of whether removal of contaminated materials or other cleanup activities are necessary, planning of short- and long-term restoration efforts, and development of a monitoring plan to document cleanup effectiveness.
Updating Dosimetry for Emergency Response Dose Projections.
DeCair, Sara
2016-02-01
In 2013, the U.S. Environmental Protection Agency (EPA) proposed an update to the 1992 Protective Action Guides (PAG) Manual. The PAG Manual provides guidance to state and local officials planning for radiological emergencies. EPA requested public comment on the proposed revisions, while making them available for interim use by officials faced with an emergency situation. Developed with interagency partners, EPA's proposal incorporates newer dosimetric methods, identifies tools and guidelines developed since the current document was issued, and extends the scope of the PAGs to all significant radiological incidents, including radiological dispersal devices or improvised nuclear devices. In order to best serve the emergency management community, scientific policy direction had to be set on how to use International Commission on Radiological Protection Publication 60 age groups in dose assessment when implementing emergency guidelines. Certain guidelines that lend themselves to different PAGs for different subpopulations are the PAGs for potassium iodide (KI), food, and water. These guidelines provide age-specific recommendations because of the radiosensitivity of the thyroid and young children with respect to ingestion and inhalation doses in particular. Taking protective actions like using KI, avoiding certain foods or using alternative sources of drinking water can be relatively simple to implement by the parents of young children. Clear public messages can convey which age groups should take which action, unlike how an evacuation or relocation order should apply to entire households or neighborhoods. New in the PAG Manual is planning guidance for the late phase of an incident, after the situation is stabilized and efforts turn toward recovery. Because the late phase can take years to complete, decision makers are faced with managing public exposures in areas not fully remediated. The proposal includes quick-reference operational guidelines to inform re-entry to the contaminated zone. Broad guidance on approaches to wide-area cleanup and cleanup goals is also provided. EPA adapted the cleanup process from the 2008 U.S. Department of Homeland Security (DHS) Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) Incidents, and the final PAG Manual will supersede that DHS guidance. Waste management guidance is also provided. Recognizing that an incident could result in radioactive waste volumes that severely strain or exceed available resources and capacity, officials may consider alternatives for disposal of waste that is relatively lightly contaminated. Waste management, including treatment, staging, and interim and long-term storage, must be an integral part of recovery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, G.C.
The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Murway, A.
1984-07-01
When the M/V Big Sam tugboat struck an oil-carrying barge in 1975, the district court held that no tort action existed, and limited the government's claim for cleanup compensation to the Federal Water Pollution Control Act (FWPCA) and a potential yield of only $15,500. The author traces the foundations of the defendant's claim that Congress intended the FWPCA to be the government's exclusive means of recovery oil cleanup costs and, citing prior case law, discusses the arguments and applies the exclusivity test to the Fifth Circuit's decision in M/V Big Sam. She concludes that the courts viewed Congress' major goalsmore » under the FWPCA to be the elimination of oil pollution and the protection of the merchant marine from potentially uninsurable risks arising out of the nation's growing environmental consciousness. Although a potential threat to the shipping and insurance companies, the court limited its ruling to third-party vessels already protected from unlimited liability. 91 references.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The decision document presents the selected remedial action for Operable Unit Two (OU2) at the O-Line Ponds Area, Milan Army Ammunition Plant, Milan, Tennessee. The goal of the overall cleanup activities at the site is to prevent migration of contaminants from soil at the site and to prevent exposures to these contaminants, so that no adverse health effects will result from current or future off-post or on-post use. Soil contaminated with explosives compounds is known to exist in the O-Line Ponds area, and under current conditions, this contamination poses a potential threat to groundwater at the site. Currently contaminated groundwatermore » is being addressed by separate remedial actions under different Operable Units (OUs).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the US Environmental Protection Agency`s (EPA) revised selected remedial actions for certain contaminated soils and groundwater at the J.H. Baxter Superfund Site in Weed, California. EPA concluded that it is not possible to achieve the 1990 ROD (PB91-921489) cleanup standards for groundwater within the DNAPL zone. The remedy consists of the 1990 ROD components plus enhancements, modifications, and additional containment measures as described in this amendment. Actions have also been selected to modify other aspects of the soils remedy previously selected for the site in the 1990 ROD.
Electronic Public Reading Room Operational Reading Room & Environmental Cleanup through April 2018 Los Alamos Legacy Cleanup Electronic Public Reading Room Environmental Cleanup from May 2018
Code of Federal Regulations, 2014 CFR
2014-07-01
... Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA. 165.1329... Area; Thea Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA... (EPA) and others in the Thea Foss and Wheeler-Osgood Waterways EPA superfund cleanup site. Vessels may...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA. 165.1329... Area; Thea Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA... (EPA) and others in the Thea Foss and Wheeler-Osgood Waterways EPA superfund cleanup site. Vessels may...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA. 165.1329... Area; Thea Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA... (EPA) and others in the Thea Foss and Wheeler-Osgood Waterways EPA superfund cleanup site. Vessels may...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA. 165.1329... Area; Thea Foss and Wheeler-Osgood Waterways EPA Superfund Cleanup Site, Commencement Bay, Tacoma, WA... (EPA) and others in the Thea Foss and Wheeler-Osgood Waterways EPA superfund cleanup site. Vessels may...
Cleanups in My Community (CIMC) is a public web application that enables integrated access through maps, lists and search filtering to site-specific information EPA has across all cleanup programs. CIMC taps into data publicly available from EPA's EnviroFacts (RCRA Corrective Action facilities, Brownfields properties and grant areas, Superfund NPL sites, other facility data) and web services (water monitoring stations, impaired waters, emergency responses, tribal boundaries, congressional districts, etc.) and connects to other applications (e.g., Superfund's CPAD) to provide easy seamless access to site-specific cleanup information with explanatory text and within the context of related data. Data can be filtered by cleanup program, geography, environmental indicators, controls, and cleanup stage. CIMC also provides some web services that integrate these data for others to use in their applications.
COMMUNITY CAPACITY BUILDING FOR REVITALIZATION AND SUSTAINABLE REDEVELOPMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Downing, Melinda; Rosenthall, John; Hudson, Michelle
2003-02-27
Capacity building programs help poor and disadvantaged communities to improve their ability to participate in the environmental decision-making processes. They encourage citizen involvement, and provide the tools that enable them to do so. Capacity building enables communities that would otherwise be excluded to participate in the process, leading to better, and more just decisions. The Department of Energy (DOE) continues to be committed to promoting environmental justice and involving its stakeholders more directly in the planning and decision-making process for environmental cleanup. DOE's Environmental Management Program (EM) is in full support of this commitment. Through its environmental justice project, EMmore » provides communities with the capacity to effectively contribute to a complex technical decision-making process by furnishing access to computers, the Internet, training and technical assistance. DOE's Dr. Samuel P. Massie Chairs of Excellence Program (Massie Chairs) function as technical advisors to many of these community projects. The Massie Chairs consist of nationally and internationally recognized engineers and scientists from nine Historically Black Colleges and Universities (HBCUs) and one Hispanic Serving Institution (HIS). This paper will discuss capacity building initiatives in various jurisdictions.« less
Wu, Huizhen; Wang, Jianmei; Yang, Hua; Li, Guoqin; Zeng, Yinhuan; Xia, Wei; Li, Zuguang; Qian, Mingrong
2017-03-10
An in-cell cleanup pressurized liquid extraction was developed to analyze prohibited antiviral agents in livestock and poultry feces. Extraction and cleanup were integrated into one step. The extraction was performed using methanol-acetonitrile (1:1, v/v) with 0.5% glacial acetic acid at 90°C, and 0.75g of PSA was used as the adsorbent during the extraction procedure. Under optimal conditions, the average recoveries for 11 antiviral drugs were 71.5-112.5% at three spiked levels (20, 40, and 100μgkg -1 ). The detection limits and detection quantitations of the analysis method for the eleven antiviral drugs were 0.6-1.4 and 1.4-4.7μgkg -1 , respectively. Finally, the method was applied to analyze amantadine, oseltamivir and its metabolites oseltamivir acid in duck feces based on an experiment of an oral dose of two antiviral drugs in duck. The amantadine, oseltamivir and oseltamivir acid can be detected in feces within approximately four weeks after amantadine and oseltamivir were orally administered. The results indicate that the residue analysis in feces is a noninvasive method to monitor inhibited antiviral agents efficiently in livestock and poultry breeding. Copyright © 2017. Published by Elsevier B.V.
Bergamaschi, B.A.; Baston, D.S.; Crepeau, K.L.; Kuivila, K.M.
1999-01-01
An analytical method useful for the quantification of a range of pesticides and pesticide degradation products associated with suspended sediments was developed by testing a variety of extraction and cleanup schemes. The final extraction and cleanup methods chosen for use are suitable for the quantification of the listed pesticides using gas chromatography-ion trap mass spectrometry and the removal of interfering coextractable organic material found in suspended sediments. Methylene chloride extraction followed by Florisil cleanup proved most effective for separation of coextractives from the pesticide analytes. Removal of elemental sulfur was accomplished with tetrabutylammonium hydrogen sulfite. The suitability of the method for the analysis of a variety of pesticides was evaluated, and the method detection limits (MDLs) were determined (0.1-6.0 ng/g dry weight of sediment) for 21 compounds. Recovery of pesticides dried onto natural sediments averaged 63%. Analysis of duplicate San Joaquin River suspended-sediment samples demonstrated the utility of the method for environmental samples with variability between replicate analyses lower than between environmental samples. Eight of 21 pesticides measured were observed at concentrations ranging from the MDL to more than 80 ng/g dry weight of sediment and exhibited significant temporal variability. Sediment-associated pesticides, therefore, may contribute to the transport of pesticides through aquatic systems and should be studied separately from dissolved pesticides.
Pareja, Lucía; Cesio, Verónica; Heinzen, Horacio; Fernández-Alba, Amadeo R
2011-02-15
Four different extraction and clean-up protocols based on the QuEChERS method were compared for the development of an optimized sample preparation procedure for the multiresidue analysis of 16 commonly applied herbicides in rice crops using LC-QqQ/MS. Additionally the methods were evaluated for the analysis of 26 insecticides and fungicides currently used in rice crops. The methods comprise, in general, the hydratation of the sample with water followed by the extraction with acetonitrile, phase separation with the addition of different salts and finally a clean-up step with various sorbents. Matrix effects were evaluated for the 4 studied methods using LC-QqQ/MS. Additionally LC-TOF/MS was used to compare the co-extractants obtained with the four assayed methodologies. Thirty-six pesticides presented good performance with recoveries in the range 70-120% and relative standard deviations below 20% using 7.5 g of milled polished rice and the buffered acetate QuEChERS method without clean-up at both fortification levels: 10 and 300 μg kg(-1). The other six pesticides presented low recovery rates, nevertheless all these analytes could be analyzed with at least one of the other three studied procedures. Copyright © 2010. Published by Elsevier B.V.
20 CFR 30.316 - How does the FAB issue a final decision on a claim?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false How does the FAB issue a final decision on a... Adjudicatory Process Hearings and Final Decisions on Claims § 30.316 How does the FAB issue a final decision on... waives any objections to all or part of the recommended decision, the FAB may issue a final decision...
Clark, Roger N.; Swayze, Gregg A.; Livo, K. Eric; Kokaly, Raymond F.; Sutley, Steve J.; Dalton, J. Brad; McDougal, Robert R.; Gent, Carol A.
2003-01-01
Imaging spectroscopy is a tool that can be used to spectrally identify and spatially map materials based on their specific chemical bonds. Spectroscopic analysis requires significantly more sophistication than has been employed in conventional broadband remote sensing analysis. We describe a new system that is effective at material identification and mapping: a set of algorithms within an expert system decision‐making framework that we call Tetracorder. The expertise in the system has been derived from scientific knowledge of spectral identification. The expert system rules are implemented in a decision tree where multiple algorithms are applied to spectral analysis, additional expert rules and algorithms can be applied based on initial results, and more decisions are made until spectral analysis is complete. Because certain spectral features are indicative of specific chemical bonds in materials, the system can accurately identify and map those materials. In this paper we describe the framework of the decision making process used for spectral identification, describe specific spectral feature analysis algorithms, and give examples of what analyses and types of maps are possible with imaging spectroscopy data. We also present the expert system rules that describe which diagnostic spectral features are used in the decision making process for a set of spectra of minerals and other common materials. We demonstrate the applications of Tetracorder to identify and map surface minerals, to detect sources of acid rock drainage, and to map vegetation species, ice, melting snow, water, and water pollution, all with one set of expert system rules. Mineral mapping can aid in geologic mapping and fault detection and can provide a better understanding of weathering, mineralization, hydrothermal alteration, and other geologic processes. Environmental site assessment, such as mapping source areas of acid mine drainage, has resulted in the acceleration of site cleanup, saving millions of dollars and years in cleanup time. Imaging spectroscopy data and Tetracorder analysis can be used to study both terrestrial and planetary science problems. Imaging spectroscopy can be used to probe planetary systems, including their atmospheres, oceans, and land surfaces.
Laidra, Kaia; Rahu, Kaja; Tekkel, Mare; Aluoja, Anu; Leinsalu, Mall
2015-11-01
To study the long-term mental health consequences of the 1986 Chernobyl nuclear accident among cleanup workers from Estonia. In 2010, 614 Estonian Chernobyl cleanup workers and 706 geographically and age-matched population-based controls completed a mail survey that included self-rated health, the Posttraumatic Stress Disorder Checklist (PCL), alcohol symptoms (AUDIT), and scales measuring depressive, anxiety, agoraphobia, fatigue, insomnia, and somatization symptoms. Respondents were dichotomized into high (top quartile) and low symptom groups on each measure. Logistic regression analysis detected significant differences between cleanup workers and controls on all measures even after adjustment for ethnicity, education, marital status, and employment status. The strongest difference was found for somatization, with cleanup workers being three times more likely than controls to score in the top quartile (OR = 3.28, 95% CI 2.39-4.52), whereas for alcohol problems the difference was half as large (OR = 1.52, 95% CI 1.16-1.99). Among cleanup workers, arrival at Chernobyl in 1986 (vs. later) was associated with sleep problems, somatization, and symptoms of agoraphobia. The toll of cleanup work was evident 24 years after the Chernobyl accident among Estonian cleanup workers indicating the need for focused mental health interventions.
The ecological impact of land restoration and cleanup. Technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-08-01
The report is concerned with the ecological impacts of specific cleanup treatment on the land where they were carried out. The cleanup procedures given apply equally to chemical or radioactive materials. Guidance is provided for cleanup procedures likely to be suggested by government, industry, or environmental groups. The basic types of cleanup procedures for removing or deactiving spilled contamination involve moving people and animals from the affected area, scraping and grading the contaminated soil into windrows, plowing the contamination under, or digging up the contamination and hauling it away. The report describes and evaluates the various land-type cleanup effects inmore » terms of impact of the techniques on the environment. Part I defines several natural ecosystems and some of their natural derivations. Part II presents managed ecosystems which are imposed on natural ecosystems and are no longer bound by the initial native ecosystem balances. Part III deals with avion and mammilian wild life displaced by cleanup.« less
OSWER’s goal is to reduce the environmental footprint of cleanup activities at contaminated sites to the maximum extent possible. This website shares policies, tools and practices to achieve that goal across cleanup programs.
Chiesa, L; Nobile, M; Panseri, S; Sgoifo Rossi, C A; Pavlovic, R; Arioli, F
2014-12-10
The presence of β-boldenone II phase metabolites and prednisolone in urine samples, owing to endogenous or natural origin or illicit treatment, is under debate within the European Union. The detection of β-boldenone conjugates, α-boldenone conjugates at concentrations higher than 2 ng mL(-1) and prednisolone above the cut-off level of 5 ng mL(-1) in urine have been, until now, critical in deciding if illegal drug use has occurred. The use of urine sometimes is not entirely satisfactory, especially when the drug is administrated at low doses or when its metabolic conversion is very fast. This subsequently would hamper its detection in urine. The introduction of a new, advantageous matrix where the illicit treatment can be investigated would be highly appreciated. In this study, we have developed and validated a simple and unique immunoaffinity clean-up procedure, which was applied to bovine bile samples, followed by two different analytical liquid chromatography-electrospray-tandem mass spectrometry methods. The first method tests androstadienedione, α- and β-boldenone sulphate, glucuronate and related free forms, while the other method assays prednisolone, prednisone, dexamethasone, cortisone, and cortisol. The methods were validated according to European Commission Decision 2002/657/EC. The evaluated parameters were linearity, specificity, precision (repeatability and intra-laboratory reproducibility), recovery, decision limit and detection capability. The decision limits (CCα) were between 0.38 and 0.45 ng mL(-1) for anabolic steroids, and 0.13 and 0.15 ng mL(-1) as far as corticosteroids were concerned. Intra- and inter-day repeatability was below 15.8 and 19.9% for all analytes, respectively. The methods were applied to the analysis of some bile samples collected from untreated young bulls in order to investigate the presence of the studied steroids in this matrix. Copyright © 2014 Elsevier B.V. All rights reserved.
Geostatistical applications in environmental remediation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, R.N.; Purucker, S.T.; Lyon, B.F.
1995-02-01
Geostatistical analysis refers to a collection of statistical methods for addressing data that vary in space. By incorporating spatial information into the analysis, geostatistics has advantages over traditional statistical analysis for problems with a spatial context. Geostatistics has a history of success in earth science applications, and its popularity is increasing in other areas, including environmental remediation. Due to recent advances in computer technology, geostatistical algorithms can be executed at a speed comparable to many standard statistical software packages. When used responsibly, geostatistics is a systematic and defensible tool can be used in various decision frameworks, such as the Datamore » Quality Objectives (DQO) process. At every point in the site, geostatistics can estimate both the concentration level and the probability or risk of exceeding a given value. Using these probability maps can assist in identifying clean-up zones. Given any decision threshold and an acceptable level of risk, the probability maps identify those areas that are estimated to be above or below the acceptable risk. Those areas that are above the threshold are of the most concern with regard to remediation. In addition to estimating clean-up zones, geostatistics can assist in designing cost-effective secondary sampling schemes. Those areas of the probability map with high levels of estimated uncertainty are areas where more secondary sampling should occur. In addition, geostatistics has the ability to incorporate soft data directly into the analysis. These data include historical records, a highly correlated secondary contaminant, or expert judgment. The role of geostatistics in environmental remediation is a tool that in conjunction with other methods can provide a common forum for building consensus.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Project Integration
2005-09-26
The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.
Voluntary Guidelines for Methamphetamine Laboratory Cleanup - Document
provides technical guidance for state and local personnel responsible for meth lab cleanup, based on an extensive review of the best available science and practices, and addresses general cleanup activities, specific items/materials, sampling.
O'Shea, Owen R; Hamann, Mark; Smith, Walter; Taylor, Heidi
2014-02-15
Efforts to curb pollution in the marine environment are covered by national and international legislation, yet weather balloons are released into the environment with no salvage agenda. Here, we assess impacts associated with weather balloons in the Great Barrier Reef World Heritage Area (GBRWHA). We use modeling to assess the probability of ocean endpoints for released weather balloons and predict pathways post-release. In addition, we use 21 months of data from beach cleanup events to validate our results and assess the abundance and frequency of weather balloon fragments in the GBRWHA. We found between 65% and 70% of balloons land in the ocean and ocean currents largely determine final endpoints. Beach cleanup data revealed 2460 weather balloon fragments were recovered from 24 sites within the GBRWHA. This is the first attempt to quantify this problem and these data will add support to a much-needed mitigation strategy for weather balloon waste. Copyright © 2013 Elsevier Ltd. All rights reserved.
Technical and Regulatory Considerations in Using Freight Containers as Industrial Packages
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawk, Mark B; Opperman, Erich; Natali, Ronald
2008-01-01
The US Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programmes. The EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer term activities necessary for the completion of the clean-up programme. The packaging and transportation of contaminated demolition debris and low level waste materials in a safe and cost effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's Final Rulemore » on Hazardous Materials Regulation issued on 26 January 2004, included a new provision authorising the use of freight containers (e.g. 20 and 40 ft ISO containers) as industrial packages type 2 or 3. This paper will discuss the technical and regulatory considerations in using these newly authorised and large packages for the packaging and transportation of low level waste materials.« less
Offshore oil spill response practices and emerging challenges.
Li, Pu; Cai, Qinhong; Lin, Weiyun; Chen, Bing; Zhang, Baiyu
2016-09-15
Offshore oil spills are of tremendous concern due to their potential impact on economic and ecological systems. A number of major oil spills triggered worldwide consciousness of oil spill preparedness and response. Challenges remain in diverse aspects such as oil spill monitoring, analysis, assessment, contingency planning, response, cleanup, and decision support. This article provides a comprehensive review of the current situations and impacts of offshore oil spills, as well as the policies and technologies in offshore oil spill response and countermeasures. Correspondingly, new strategies and a decision support framework are recommended for improving the capacities and effectiveness of oil spill response and countermeasures. In addition, the emerging challenges in cold and harsh environments are reviewed with recommendations due to increasing risk of oil spills in the northern regions from the expansion of the Arctic Passage. Copyright © 2016 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
...-FF02ENEH00] Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's... the final environmental impact statement (EIS), and final record of decision under the National... implementation of the final Oncor Electric Delivery LLC's Habitat Conservation Plan (HCP). Our decision is to...
Corrective Action Sites around the Nation
Provide info to the public/community orgs, local officials & consultants on nearby corrective action cleanups, the status of the cleanup and future plans. Links to the Natl Corrective Action, Cleanups in My Community & Cleaning Up Our Land, Water & Air
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clayton, Christopher; Kothari, Vijendra; Starr, Ken
2012-07-01
The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequatelymore » described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators. After review of historical site documentation, DOE reports, and USACE radiological data, DOE concluded the following: - DOE had access to adequate documentation to evaluate site conditions at the former LOOW. This is important to confirm now, while institutional knowledge of early FUSRAP work remains available. - DOE remediated the completed VPs to conditions that are protective for unrestricted residential use. Sample and walkover gamma scan results indicate that no wastes remain that exceed cleanup criteria. - Process knowledge and field observations establish that Cs-137 is the predominant radionuclide in the KAPL waste stream. Cs-137, a strong gamma emitter, was used as an indicator for remediation of KAPL waste. Other radionuclides were present in much lower relative concentrations and were likely also removed during remediation of the VPs. - KAPL contaminants were removed during remedial activities at the former LOOW as either co-located or co-mingled with other radionuclides. - For the active VPs (VP-E, VP-E', and VP-G), results of DOE's cleanup of the accessible portions of these properties indicate that KAPL waste does not remain at concentrations greater than the DOE cleanup limit: - Inaccessible areas were not associated with historic KAPL waste handling. Therefore, it is unlikely that KAPL waste remains on the active VPs. - Because gamma activity was used by DOE during remediation/verification activities for excavation control, additional USACE cleanup of FUSRAP wastes on these properties will likely result in the remediation of any co-located residual KAPL wastes to acceptable levels or identification of KAPL waste that is not co-located. - Although USACE has not established a cleanup level for Cs-137 on the active NFSS VPs, DOE assessment and remediation data indicate that assessed Cs-137 was remediated and significant Cs-137 is unlikely to remain. Because of the low likelihood of encountering significant KAPL waste on the active NFSS VPs, additional remediation is not anticipated at these properties. - USACE assessment soil sampling results on the NFSS proper indicate that KAPL waste does not exceed the DOE cleanup level for Cs-137. USACE has not established a cleanup level for Cs-137 on NFSS proper. The USACE cleanup of FUSRAP wastes on the NFSS proper will likely result in the remediation of any co-located residual KAPL wastes or identification of KAPL waste that is not co-located. DOE is drafting a report of the investigation of KAPL waste at LOOW. The report will be released to the public for comment when the draft is complete. DOE responses to stakeholder inquiries resulted in a common understanding of site conditions and site risk. DOE expects additional interaction with stakeholders at the former LOOW as USACE completes remediation of the active VPs and the NFSS proper, and these relationships will hopefully have built trust between DOE and the stakeholders that DOE will perform its duties in an open and transparent manner that includes stakeholders as stewards for remediated FUSRAP sites. (authors)« less
Lehotay, Steven J; Han, Lijun; Sapozhnikova, Yelena
2016-01-01
This study demonstrated the application of an automated high-throughput mini-cartridge solid-phase extraction (mini-SPE) cleanup for the rapid low-pressure gas chromatography-tandem mass spectrometry (LPGC-MS/MS) analysis of pesticides and environmental contaminants in QuEChERS extracts of foods. Cleanup efficiencies and breakthrough volumes using different mini-SPE sorbents were compared using avocado, salmon, pork loin, and kale as representative matrices. Optimum extract load volume was 300 µL for the 45 mg mini-cartridges containing 20/12/12/1 (w/w/w/w) anh. MgSO 4 /PSA (primary secondary amine)/C 18 /CarbonX sorbents used in the final method. In method validation to demonstrate high-throughput capabilities and performance results, 230 spiked extracts of 10 different foods (apple, kiwi, carrot, kale, orange, black olive, wheat grain, dried basil, pork, and salmon) underwent automated mini-SPE cleanup and analysis over the course of 5 days. In all, 325 analyses for 54 pesticides and 43 environmental contaminants (3 analyzed together) were conducted using the 10 min LPGC-MS/MS method without changing the liner or retuning the instrument. Merely, 1 mg equivalent sample injected achieved <5 ng g -1 limits of quantification. With the use of internal standards, method validation results showed that 91 of the 94 analytes including pairs achieved satisfactory results (70-120 % recovery and RSD ≤ 25 %) in the 10 tested food matrices ( n = 160). Matrix effects were typically less than ±20 %, mainly due to the use of analyte protectants, and minimal human review of software data processing was needed due to summation function integration of analyte peaks. This study demonstrated that the automated mini-SPE + LPGC-MS/MS method yielded accurate results in rugged, high-throughput operations with minimal labor and data review.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Angleberger, K; Bainer, R W
2000-12-12
The Lawrence Livermore National Laboratory (LLNL) has been consistently improving the site cleanup methods by adopting new philosophies, strategies and technologies to address constrained or declining budgets, lack of useable space due to a highly industrialized site, and significant technical challenges. As identified in the ROD, the preferred remedy at the LLNL Livermore Site is pump and treat, although LLNL has improved this strategy to bring the remediation of the ground water to closure as soon as possible. LLNL took the logical progression from a pump and treat system to the philosophy of ''Smart Pump and Treat'' coupled with themore » concepts of ''Hydrostratigraphic Unit Analysis,'' ''Engineered Plume Collapse,'' and ''Phased Source Remediation,'' which led to the development of new, more cost-effective technologies which have accelerated the attainment of cleanup goals significantly. Modeling is also incorporated to constantly develop new, cost-effective methodologies to accelerate cleanup and communicate the progress of cleanup to stakeholders. In addition, LLNL improved on the efficiency and flexibility of ground water treatment facilities. Ground water cleanup has traditionally relied on costly and obtrusive fixed treatment facilities. LLNL has designed and implemented various portable ground water treatment units to replace the fixed facilities; the application of each type of facility is determined by the amount of ground water flow and contaminant concentrations. These treatment units have allowed for aggressive ground water cleanup, increased cleanup flexibility, and reduced capital and electrical costs. After a treatment unit has completed ground water cleanup at one location, it can easily be moved to another location for additional ground water cleanup.« less
The National LUST Cleanup Backlog: A Study of Opportunities
To understand the makeup of UST releases remaining and why the pace of cleanups is slowing, EPA undertook a two-phase, data-driven analysis of the cleanups remaining as of 2006 (Phase 1) and 2009 (Phase 2).
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1992.
1993-04-02
5. Eielson AFB , AK 24,336 159,535 6. Ellsworth AFB , SD 8,521 63,000 7. Elmendorf AFB , AK 23,227 107,263 8. Fairchild AFB (4 Waste Areas), WA 13,738...HRS Score (Latest) FY 92 FY 92 Status Year AIR FORCE (Continued) 7. Eielson AFB AK 48.14 92 7,055 14,799 FIN 91 8. Ellsworth AFB SD 33.62 91 690 7,831...decided at their October 7, 1992 cleanup decisions at Air Force meeting to recommend the use of . Andersen AFB , Guam installations. As part of the first
Tephra fall clean-up in urban environments
NASA Astrophysics Data System (ADS)
Hayes, Josh L.; Wilson, Thomas M.; Magill, Christina
2015-10-01
Tephra falls impact urban communities by disrupting transport systems, contaminating and damaging buildings and infrastructures, and are potentially hazardous to human health. Therefore, prompt and effective tephra clean-up measures are an essential component of an urban community's response to tephra fall. This paper reviews case studies of tephra clean-up operations in urban environments around the world, spanning 50 years. It identifies methods used in tephra clean-up and assesses a range of empirical relationships between level of tephra accumulation and clean-up metrics such as collected tephra volume, costs, and duration of operations. Results indicate the volume of tephra collected from urban areas is proportional to tephra accumulation. Urban areas with small tephra accumulations (1,000 m3/km2 or an average of 1 mm thickness) may collect < 1% of the total deposit, whereas urban areas which experience large accumulations (> 50,000 m3/km2 or an average of 50 mm thickness) remove up to 80%. This relationship can inform impact and risk assessments by providing an estimate of the likely response required for a given tephra fall. No strong relationship was found between tephra fall accumulation and clean-up cost or duration for urban environments which received one-off tephra falls, suggesting that these aspects of tephra fall clean-up operations are context specific. Importantly, this study highlights the advantage of effective planning for tephra clean-up and disposal in potentially exposed areas.
Science plus management equals successful remediation -- A case study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buehlman, M.D.; Rogers, D.T.; Payne, F.C.
In the past, owners of contaminated sites attempted to remediate as quickly as possible, usually by excavating contaminated soil or pumping and treating contaminated groundwater. Often, they started remediation before identifying all potential types and sources of contaminants, and before conducting a thorough hydrogeologic study. Such premature action usually resulted in the selected remedy not working, the contamination spreading, or unnecessary remedial activities. Today, successful site remediation is recognized as a complex and time-consuming undertaking--requiring a combination of careful scientific study, effective negotiation with the regulatory agencies and skillful management of multidisciplinary efforts. A case study involving a Brownfields sitemore » in southeastern Michigan clearly illustrates the elements of successful remediation. The site`s soil was contaminated with polychlorinated biphenyls (PCBs) and its groundwater with a variety of chlorinated solvents. The original estimate for remediation had exceeded $30 million. Several phases of investigation were conducted to evaluate the nature and sources of contaminants, the site`s hydrogeology, potential risks to human health and the environment, and feasible remedial technologies. Multiple cleanup criteria were established for different affected areas based on the results of the investigations, changes that were taking place with the state cleanup regulations and standards and subsequent negotiations with state and federal regulators. Innovative remedial technologies were selected. The result was a remediation that met or exceeded all soil and groundwater cleanup objectives, was performed on schedule, and was highly cost-effective. The final cost was limited to $3 million--one-tenth of the original estimate.« less
Green and sustainable remediation practices in Federal agency cleanup programs
Martino, Louis E.; Dona, Carol L.; Dicerbo, Jerry; ...
2016-10-27
Federal agencies manage hazardous waste sites under the assumption that environmental restoration will improve the environment by returning contaminated groundwater to beneficial use, removing waste residuals from a site, treating discharges to surface water, and reducing overall risks to human health and the environment. However, the associated time-consuming and expensive operations, extensive performance monitoring, and post-closure care can lead to unanticipated environmental impacts due to both the technological nature of these cleanup activities and the related protracted timelines. These life-cycle impacts can and should be included in the evaluation of remedial alternatives. Increasingly, Federal agencies are considering these life-cycle impacts—more » variously referred to as ‘‘environmental footprint analysis,’’ ‘‘sustainable remediation,’’ ‘‘green remediation,’’ ‘‘greener remediation,’’ and ‘‘green and sustainable remediation’’— when evaluating environmental restoration approaches. For the purposes of this paper, this concept will be referred to as ‘‘green and sustainable remediation’’ (GSR), with application of GSR assumed to take place across the cleanup life cycle, from the investigation phase through site closeout. This paper will discuss the history of GSR, what GSR is, who is implementing GSR, and GSR metrics. Finally, the paper will also discuss two approaches to GSR, using case studies to understand and implement it; the first will be a qualitative approach, and the second a more detailed quantitative approach« less
Green and sustainable remediation practices in Federal agency cleanup programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martino, Louis E.; Dona, Carol L.; Dicerbo, Jerry
Federal agencies manage hazardous waste sites under the assumption that environmental restoration will improve the environment by returning contaminated groundwater to beneficial use, removing waste residuals from a site, treating discharges to surface water, and reducing overall risks to human health and the environment. However, the associated time-consuming and expensive operations, extensive performance monitoring, and post-closure care can lead to unanticipated environmental impacts due to both the technological nature of these cleanup activities and the related protracted timelines. These life-cycle impacts can and should be included in the evaluation of remedial alternatives. Increasingly, Federal agencies are considering these life-cycle impacts—more » variously referred to as ‘‘environmental footprint analysis,’’ ‘‘sustainable remediation,’’ ‘‘green remediation,’’ ‘‘greener remediation,’’ and ‘‘green and sustainable remediation’’— when evaluating environmental restoration approaches. For the purposes of this paper, this concept will be referred to as ‘‘green and sustainable remediation’’ (GSR), with application of GSR assumed to take place across the cleanup life cycle, from the investigation phase through site closeout. This paper will discuss the history of GSR, what GSR is, who is implementing GSR, and GSR metrics. Finally, the paper will also discuss two approaches to GSR, using case studies to understand and implement it; the first will be a qualitative approach, and the second a more detailed quantitative approach« less
Meischl, Florian; Kirchler, Christian Günter; Jäger, Michael Andreas; Huck, Christian Wolfgang; Rainer, Matthias
2018-02-01
We present a novel method for the quantitative determination of the clean-up efficiency to provide a calculated parameter for peak purity through iterative fitting in conjunction with design of experiments. Rosemary extracts were used and analyzed before and after solid-phase extraction using a self-fabricated mixed-mode sorbent based on poly(N-vinylimidazole/ethylene glycol dimethacrylate). Optimization was performed by variation of washing steps using a full three-level factorial design and response surface methodology. Separation efficiency of rosmarinic acid from interfering compounds was calculated using an iterative fit of Gaussian-like signals and quantifications were performed by the separate integration of the two interfering peak areas. Results and recoveries were analyzed using Design-Expert® software and revealed significant differences between the washing steps. Optimized parameters were considered and used for all further experiments. Furthermore, the solid-phase extraction procedure was tested and compared with commercial available sorbents. In contrast to generic protocols of the manufacturers, the optimized procedure showed excellent recoveries and clean-up rates for the polymer with ion exchange properties. Finally, rosemary extracts from different manufacturing areas and application types were studied to verify the developed method for its applicability. The cleaned-up extracts were analyzed by liquid chromatography with tandem mass spectrometry for detailed compound evaluation to exclude any interference from coeluting molecules. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Social equity and environmental risk
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zimmerman, R.
1993-12-01
Social equity has become an important concern of the environmental movement over the past decade. The equity issue is analyzed here for practically all of the inactive hazardous waste disposal sites on the National Priorities List (NPL) regulated under the Comprehensive Response Compensation and Liability Act and its 1986 Superfund Amendments and Reauthorization Act (CERCLA/SARA). Two dimensions of equity are emphasized, namely, site location relative to the location of minority population and the distribution of cleanup plans or Records of Decision (ROD) across communities with NPL sites that have different socioeconomic characteristics. With respect to site location, the percentage ofmore » Blacks and Hispanics aggregated at the Census Place or MCD level in communities with NPL sites was greater than is typical nationwide (largely attributable to the concentration of minority populations in a few large urban areas with NPL sites). The percentage of the population below the poverty line in communities with NPL sites largely matched that of the nation as a whole. With respect to site cleanup, communities with relatively higher percentages of racial minority population have fewer cleanup plans than other communities with NPL site. Whether a ROD exists is influenced by when the site was designated for the NPL: sites designated earlier are more likely to have RODs and less likely to have high proportions of racial minority populations than sites designated later. This implies that initially the designation process may have resulted in NPL sites being located disproportionately in minority areas, but this pattern seems to be reversing itself in more recently designated sites. Racial and ethnic disproportionalities with respect to inactive hazardous waste site location seem to be concentrated in a relatively few areas. 35 refs., 12 tabs.« less
ENERGY CONSERVATION AND PRODUCTION AT WASTE CLEANUP SITES (ISSUE PAPER)
Saving energy used by hazardous waste cleanup remediation systems should interest those people working on waste cleanup sites. Presidential Executive Order 13123, "Greening the Government Through Efficient Energy Management", states that each agency shall strive to expand the us...
Seraglio, Siluana Katia Tischer; Valese, Andressa Camargo; Daguer, Heitor; Bergamo, Greici; Azevedo, Mônia Stremel; Gonzaga, Luciano Valdemiro; Fett, Roseane; Costa, Ana Carolina Oliveira
2016-09-01
A simple, reproducible and sensitive method has been optimized and validated for simultaneous determination of 32 phenolic compounds in bracatinga (Mimosa scabrella Benth.) with the diluted-and-shoot approach, without the need of any additional clean-up steps. It has been based on high performance liquid chromatography coupled with triple quadrupole tandem mass spectrometry and electrospray ionization (HPLC-ESI-MS/MS). The chromatography conditions were optimized, and due to the selectivity provided by MRM monitoring, LC separation required only 9min. The developed method was validated on the basis of Eurachem and European Commission Decision 2002/657/EC guidelines. Mean recoveries ranged from 70.4 to 110%. Intra-day and inter-day precision with RSD (relative standard deviations) from 0.14 to 18.9% and 0.34 to 20.0%, respectively were achieved. Limits of detection (LOD) and quantification (LOQ) ranged from 0.03 to 3.20μgL -1 and 0.20-12.8μgL -1 . Finally, the method was applied to samples and 20 phenolic compounds were quantified in all the samples analyzed, representing a contribution to the characterization and quantification of phenolic compounds from bracatinga (M. scabrella Bentham) honeydew honey. Copyright © 2016 Elsevier Ltd. All rights reserved.
Brownfields Grants Information
This asset includes all types of information regarding Brownfields grant programs that subsidize/support Brownfield cleanup. This includes EPA's Brownfields Program grant funding for brownfields assessment, cleanup, revolving loans, and environmental job training. Assessment grants provide funding for a grant recipient to inventory, characterize, assess, and conduct planning and community involvement related to brownfield sites. Revolving Loan Fund Grants enable States, political subdivisions, and Indian tribes to make low interest loans to carryout cleanup activities at brownfields properties. Cleanup grants provide funding for a grant recipient to carry out cleanup activities at brownfield sites. Environmental Workforce Development and Job Training Grants are designed to provide funding to eligible entities, including nonprofit organizations, to recruit, train, and place predominantly low-income and minority, unemployed and under-employed residents of solid and hazardous waste-impacted communities with the skills needed to secure full-time, sustainable employment in the environmental field and in the assessment and cleanup work taking place in their communities. Training, Research, and Technical Assistance Grants provide funding to eligible organizations to provide training, research, and technical assistance to facilitate brownfields cleanup. Regulatory authority for the collection and use of this information is found in the Small Business Liability Relief
10 CFR 950.37 - Final agreement or final decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Final agreement or final decision. 950.37 Section 950.37 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.37 Final agreement or final decision. (a) If the parties reach a Final Agreement on a contract...
48 CFR 32.605 - Final decisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue a final decision as required by 33.211 if— (1) The contracting officer and the contractor are unable... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final decisions. 32.605...
Hazardous Waste: Cleanup and Prevention.
ERIC Educational Resources Information Center
Vandas, Steve; Cronin, Nancy L.
1996-01-01
Discusses hazardous waste, waste disposal, unsafe exposure, movement of hazardous waste, and the Superfund clean-up process that consists of site discovery, site assessment, clean-up method selection, site clean up, and site maintenance. Argues that proper disposal of hazardous waste is everybody's responsibility. (JRH)
HANDBOOK ON THE BENEFITS, COSTS, AND IMPACTS OF LAND CLEANUP AND REUSE
Summarizes the theoretical and empirical literature addressing benefit-cost and impact assessment of the land cleanup and reuse scenario. When possible, recommendations are provided for conducting economic analysis of land cleanup and reuse sites and programs. The knowledge base ...
Analysis of state Superfund programs: 50 state study. 1998 update
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
States have remediated over 40,000 contaminated sites not on the federal Superfund list. ELI`s latest analysis of state Superfund programs examines the cleanup programs of all 50 states, Puerto Rico, and the District of Columbia. The study provides the most current data on state statutes, program organization, staffing, funding, expenditures, cleanup standards, and cleanup activities, voluntary cleanup programs and brownfields programs. State and federal policymakers and attorneys working on non-NPL sites should find this study useful.
Goel, Amit; Singh, Atul; Gupta, Tarun
2017-01-01
Background The purpose of this study was to analyze and compare the enamel surface roughness before bonding and after debonding, to find correlation between the adhesive remnant index and its effect on enamel surface roughness and to evaluate which clean-up method is most efficient to provide a smoother enamel surface. Material and Methods 135 premolars were divided into 3 groups containing 45 premolars in each group. Group I was bonded by using moisture insensitive primer, Group II by using conventional orthodontic adhesive and Group III by using self-etching primer. Each group was divided into 3 sub-groups on the basis of type of clean-up method applied i,e scaling followed by polishing, tungsten carbide bur and Sof-Lex disc. Enamel surface roughness was measured and compared before bonding and after clean-up. Results Evaluation of pre bonding and post clean-up enamel surface roughness (Ra value) with the t test showed that Post clean-up Ra values were greater than Pre bonding Ra values in all the groups except in teeth bonded with self-etching primer cleaned with Sof-Lex disc. Reliability of ARI score taken at different time interval tested with Kruskal Wallis test suggested that all the readings were reliable. Conclusions No clean-up procedure was able to restore the enamel to its original smoothness. Self-etching primer and Sof-Lex disc clean-up method combination restored the enamel surface roughness (Ra value) closest to its pre-treatment value. Key words:Enamel surface roughness, clean-up method, adhesive remnant index. PMID:28512535
40 CFR 312.25 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2010 CFR
2010-07-01
... cleanup liens. 312.25 Section 312.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS INNOCENT LANDOWNERS, STANDARDS FOR... cleanup liens. (a) All appropriate inquiries must include a search for the existence of environmental...
Successful implementation of property cleanup under the Ohio and the Texas voluntary programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roffman, A.
1999-07-01
Cleanups of two properties, one located in Ohio and the other in Texas were successfully implemented. The facilities were printing plants that manufactured printed material and forms for commercial and industrial use. Primary products and chemicals involved in the manufacturing of the forms included ink, petroleum products and cleaning solvents. The Ohio property underwent a successful cleanup under the Ohio EPA Voluntary Action Program (VAP). It met the Ohio EPA residential land use cleanup standards for soil and shallow groundwater. A No Further Action letter has been submitted to the state and it resulted in the issuance of a Covenantmore » Not to Sue. The Texas facility underwent a successful cleanup under the Texas Natural Resource Conservation Commission (TNRCC) Voluntary Cleanup Program (VCP). It resulted in the issuance of a Certificate of Completion (COC) for residential land use for soil, and a conditional COC for industrial land use for the shallow groundwater.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This decision document presents the selected remedial action for the soil within the northern industrial area of Milan Army Ammunition Plant, Milan, Tennessee. The goal of the cleanup activities at the northern industrial areas of MAAP is to remove the soil contaminated with explosives compounds above risk-based levels. The excavated soil will be treated using a bioremediation process to reduce the concentrations of explosives compounds, the toxicity of the leachate, and the mobility of the remaining organic compounds. The treated soil will then be placed in an on-site solid waste landfill in compliance with State of Tennessee regulations. Additionally, inmore » areas where excavation of the explosives-contaminated soil is infeasible, the soil will be covered with an engineered cap to prevent worker exposure to the explosives compounds and prevent leaching of these compounds to groundwater.« less
48 CFR 49.105-4 - Cleanup of construction site.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cleanup of construction site. 49.105-4 Section 49.105-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105-4 Cleanup of construction site. In...
26 CFR 301.7481-1 - Date when Tax Court decision becomes final; decision modified or reversed.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the Supreme Court directs that the decision of the Tax Court be modified or reversed, the decision of... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Date when Tax Court decision becomes final... Proceedings Civil Actions by the United States § 301.7481-1 Date when Tax Court decision becomes final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
2015-04-21
perchlorates; reducing agents can be sulfur and charcoal; metals can be added to regulate the speed of reaction; starch is typically used as a binder; and...textured soil, or desert pavements consisting of gravel or rock. Plants are drought- resistant with hardened leaves and shortened distances between...reducing agents can be sulfur and charcoal; metals can be added to regulate the speed of reaction; starch is typically used as a binder; and metals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, M.D.
Analytical Chemistry of PCBs offers a review of physical, chemical, commercial, environmental and biological properties of PCBs. It also defines and discusses six discrete steps of analysis: sampling, extraction, cleanup, determination, data reduction, and quality assurance. The final chapter provides a discussion on collaborative testing - the ultimate step in method evaluation. Dr. Erickson also provides a bibliography of over 1200 references, critical reviews of primary literature, and five appendices which present ancillary material on PCB nomen-clature, physical properties, composition of commercial mixtures, mass spectra characteristics, and PGC/ECD chromatograms.
2007-09-01
sulfuric acid , and analyzed according to USEPA Method 8082 (1996) using a Hewlett Packard Series II 5890 Gas Chromatograph equipped with dual electron... sulfuric acid to reduce the slurry pH to approximately 4, and • 30 percent H2O2 to create a 100-mg/L final aqueous concentration. Cobble treatment...Wastes: Physical/Chemical Methods (USEPA SW 846). 1996. Method 3665A. Sulfuric acid /permanganate cleanup. Washington, DC. United States
30 CFR 75.400-2 - Cleanup program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Cleanup program. 75.400-2 Section 75.400-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Combustible Materials and Rock Dusting § 75.400-2 Cleanup...
30 CFR 75.400-2 - Cleanup program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Cleanup program. 75.400-2 Section 75.400-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Combustible Materials and Rock Dusting § 75.400-2 Cleanup...
30 CFR 75.400-2 - Cleanup program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Cleanup program. 75.400-2 Section 75.400-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Combustible Materials and Rock Dusting § 75.400-2 Cleanup...
30 CFR 75.400-2 - Cleanup program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Cleanup program. 75.400-2 Section 75.400-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Combustible Materials and Rock Dusting § 75.400-2 Cleanup...
30 CFR 75.400-2 - Cleanup program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cleanup program. 75.400-2 Section 75.400-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Combustible Materials and Rock Dusting § 75.400-2 Cleanup...
Assessment of spatial variation of risks in small populations.
Riggan, W B; Manton, K G; Creason, J P; Woodbury, M A; Stallard, E
1991-01-01
Often environmental hazards are assessed by examining the spatial variation of disease-specific mortality or morbidity rates. These rates, when estimated for small local populations, can have a high degree of random variation or uncertainty associated with them. If those rate estimates are used to prioritize environmental clean-up actions or to allocate resources, then those decisions may be influenced by this high degree of uncertainty. Unfortunately, the effect of this uncertainty is not to add "random noise" into the decision-making process, but to systematically bias action toward the smallest populations where uncertainty is greatest and where extreme high and low rate deviations are most likely to be manifest by chance. We present a statistical procedure for adjusting rate estimates for differences in variability due to differentials in local area population sizes. Such adjustments produce rate estimates for areas that have better properties than the unadjusted rates for use in making statistically based decisions about the entire set of areas. Examples are provided for county variation in bladder, stomach, and lung cancer mortality rates for U.S. white males for the period 1970 to 1979. PMID:1820268
20 CFR 30.319 - May a claimant request reconsideration of a final decision of the FAB?
Code of Federal Regulations, 2010 CFR
2010-04-01
... final decision of the FAB? 30.319 Section 30.319 Employees' Benefits OFFICE OF WORKERS' COMPENSATION... reconsideration of a final decision of the FAB? (a) A claimant may request reconsideration of a final decision of the FAB by filing a written request with the FAB within 30 days from the date of issuance of such...
43 CFR 30.266 - When is a final decision issued?
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROCEDURES Tribal Purchase of Interests Under Special Statutes § 30.266 When is a final decision issued? This... subject to the tribal purchase option, the decision must so state. (3) A copy of the probate decision... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false When is a final decision issued? 30.266...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seales, Maxian B.; Dilmore, Robert; Ertekin, Turgay
Horizontal wells combined with successful multistage-hydraulic-fracture treatments are currently the most-established method for effectively stimulating and enabling economic development of gas-bearing organic-rich shale formations. Fracture cleanup in the stimulated reservoir volume (SRV) is critical to stimulation effectiveness and long-term well performance. But, fluid cleanup is often hampered by formation damage, and post-fracture well performance frequently falls to less than expectations. A systematic study of the factors that hinder fracture-fluid cleanup in shale formations can help optimize fracture treatments and better quantify long-term volumes of produced water and gas. Fracture-fluid cleanup is a complex process influenced by mutliphase flow through porousmore » media (relative permeability hysteresis, capillary pressure), reservoir-rock and -fluid properties, fracture-fluid properties, proppant placement, fracture-treatment parameters, and subsequent flowback and field operations. Changing SRV and fracture conductivity as production progresses further adds to the complexity of this problem. Numerical simulation is the best and most-practical approach to investigate such a complicated blend of mechanisms, parameters, their interactions, and subsequent effect on fracture-fluid cleanup and well deliverability. Here, a 3D, two-phase, dual-porosity model was used to investigate the effect of mutliphase flow, proppant crushing, proppant diagenesis, shut-in time, reservoir-rock compaction, gas slippage, and gas desorption on fracture-fluid cleanup and well performance in Marcellus Shale. Our findings have shed light on the factors that substantially constrain efficient fracture-fluid cleanup in gas shales, and we have provided guidelines for improved fracture-treatment designs and water management.« less
Seales, Maxian B.; Dilmore, Robert; Ertekin, Turgay; ...
2017-04-01
Horizontal wells combined with successful multistage-hydraulic-fracture treatments are currently the most-established method for effectively stimulating and enabling economic development of gas-bearing organic-rich shale formations. Fracture cleanup in the stimulated reservoir volume (SRV) is critical to stimulation effectiveness and long-term well performance. But, fluid cleanup is often hampered by formation damage, and post-fracture well performance frequently falls to less than expectations. A systematic study of the factors that hinder fracture-fluid cleanup in shale formations can help optimize fracture treatments and better quantify long-term volumes of produced water and gas. Fracture-fluid cleanup is a complex process influenced by mutliphase flow through porousmore » media (relative permeability hysteresis, capillary pressure), reservoir-rock and -fluid properties, fracture-fluid properties, proppant placement, fracture-treatment parameters, and subsequent flowback and field operations. Changing SRV and fracture conductivity as production progresses further adds to the complexity of this problem. Numerical simulation is the best and most-practical approach to investigate such a complicated blend of mechanisms, parameters, their interactions, and subsequent effect on fracture-fluid cleanup and well deliverability. Here, a 3D, two-phase, dual-porosity model was used to investigate the effect of mutliphase flow, proppant crushing, proppant diagenesis, shut-in time, reservoir-rock compaction, gas slippage, and gas desorption on fracture-fluid cleanup and well performance in Marcellus Shale. Our findings have shed light on the factors that substantially constrain efficient fracture-fluid cleanup in gas shales, and we have provided guidelines for improved fracture-treatment designs and water management.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... for OMB Review; Comment Request; Cleanup Program for Accumulations of Coal and Float Coal Dusts, Loose Coal, and Other Combustibles ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the... (ICR) proposal; titled, ``Cleanup Program for Accumulations of Coal and Float Coal Dusts, Loose Coal...
Brownfields to School Sites: How Can the State Facilitate Cleanup To Build Essential Schools?
ERIC Educational Resources Information Center
California State Legislature, Sacramento. Select Committee on Environmental Justice.
This document presents background information and testimony concerning the cleanup of potentially contaminated vacant or underutilized property for use as future school sites in low-income and minority communities. Various proposals are offered that would allow the state, where necessary, to facilitate the cleanup of these "brownfields"…
Texas Coastal Cleanup Report, 1986.
ERIC Educational Resources Information Center
O'Hara, Kathryn; And Others
During the 1986 Coastweek, a national event dedicated to improvement of the marine environment, a large beach cleanup was organized on the Texas coast. The goals of the cleanup were to create public awareness of the problems caused by marine debris, and to collect data on the types and quantities of debris found on the Texas coastline. The…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
.../ Tideflats superfund cleanup remediation efforts. This RNA will prohibit activities that would disturb the.../Tideflats superfund cleanup remediation process in those waters. These caps consist of approximately three... remediation efforts of the U.S. Environmental Protection Agency (EPA) and others in the Thea Foss and Wheeler...
40 CFR 761.125 - Requirements for PCB spill cleanup.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Additional pre- or post-cleanup sampling. (B) The estimated cost of the cleanup by man-hours, dollars, or... section are designed to be consistent with existing reporting requirements to the extent possible so as to...) by standard commercial wipe tests. (ii) All soil within the spill area (i.e., visible traces of soil...
40 CFR 761.125 - Requirements for PCB spill cleanup.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Additional pre- or post-cleanup sampling. (B) The estimated cost of the cleanup by man-hours, dollars, or... section are designed to be consistent with existing reporting requirements to the extent possible so as to...) by standard commercial wipe tests. (ii) All soil within the spill area (i.e., visible traces of soil...
40 CFR 761.125 - Requirements for PCB spill cleanup.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Additional pre- or post-cleanup sampling. (B) The estimated cost of the cleanup by man-hours, dollars, or... section are designed to be consistent with existing reporting requirements to the extent possible so as to...) by standard commercial wipe tests. (ii) All soil within the spill area (i.e., visible traces of soil...
40 CFR 761.125 - Requirements for PCB spill cleanup.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Additional pre- or post-cleanup sampling. (B) The estimated cost of the cleanup by man-hours, dollars, or... section are designed to be consistent with existing reporting requirements to the extent possible so as to...) by standard commercial wipe tests. (ii) All soil within the spill area (i.e., visible traces of soil...
40 CFR 761.125 - Requirements for PCB spill cleanup.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Additional pre- or post-cleanup sampling. (B) The estimated cost of the cleanup by man-hours, dollars, or... section are designed to be consistent with existing reporting requirements to the extent possible so as to...) by standard commercial wipe tests. (ii) All soil within the spill area (i.e., visible traces of soil...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... Environmental Assessment (Final EA) and a Finding of No Significant Impact (FONSI)/Record of Decision (ROD) for... Environmental Assessment (Final EA) and Finding of No Significant Impact (FONSI)/Record of Decision (ROD) for a...)/Record of Decision (ROD) based on the Final Environmental Assessment (Final EA) for a Proposed Airport...
49 CFR 98.11 - Final administrative decision.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Final administrative decision. 98.11 Section 98.11 Transportation Office of the Secretary of Transportation ENFORCEMENT OF RESTRICTIONS ON POST-EMPLOYMENT ACTIVITIES Administration of Enforcement Proceedings § 98.11 Final administrative decision. The final...
Chatterjee, Niladri S; Utture, Sagar; Banerjee, Kaushik; Ahammed Shabeer, T P; Kamble, Narayan; Mathew, Suseela; Ashok Kumar, K
2016-04-01
This paper reports a selective and sensitive method for multiresidue determination of 119 chemical residues including pesticides and polyaromatic hydrocarbons (PAH) in high fatty fish matrix. The novel sample preparation method involved extraction of the target analytes from homogenized fish meat (5 g) in acetonitrile (15 mL, 1% acetic acid) after three-phase partitioning with hexane (2 mL) and the remaining aqueous layer. An aliquot (1.5 mL) of the acetonitrile layer was aspirated and subjected to two-stage dispersive solid phase extraction (dSPE) cleanup and the residues were finally estimated by gas chromatography mass spectrometry with selected reaction monitoring (GC-MS/MS). The co-eluted matrix components were identified on the basis of their accurate mass by GC with quadrupole time of flight MS. Addition of hexane during extraction and optimized dSPE cleanup significantly minimized the matrix effects. Recoveries at 10, 25 and 50 μg/kg were within 60-120% with associated precision, RSD<11%. Copyright © 2015 Elsevier Ltd. All rights reserved.
Manzano, Carlos; Hoh, Eunha; Massey Simonich, Staci L.
2014-01-01
This research is the first to quantify complex PAH mixtures in NIST SRMs using comprehensive two-dimensional gas chromatography coupled to time-of-flight mass spectrometry (GC×GC/ToF-MS), with and without extract cleanup, and reports previously unidentified PAH isomers in the NIST SRMs. We tested a novel, high orthogonality GC column combination (LC-50×NSP-35), as well as with a commonly used column combination (Rtx-5ms×Rxi-17) for the quantification of a complex mixture of 85 different PAHs, including parent (PAHs), alkyl- (MPAHs), nitro- (NPAHs), oxy- (OPAHs), thio- (SPAHs), bromo- (BrPAHs), and chloro-PAHs (ClPAHs) in extracts from two standard reference materials: NIST SRM1650b (diesel particulate matter), with cleanup and NIST SRM1975 (diesel particulate extract), with and without extract cleanup. The LC-50×NSP-35 column combination resulted in an average absolute percent difference of 33.8%, 62.2% and 30.8% compared to the NIST certified PAH concentrations for NIST SRM1650b, NIST SRM1975 with cleanup and NIST SRM1975 without cleanup, while the Rtx-5ms×Rxi-17 resulted in an absolute percent difference of 38.6%, 67.2% and 79.6% for NIST SRM1650b, NIST SRM1975 with cleanup and NIST SRM1975 without cleanup, respectively. This GC×GC/ToF-MS method increases the number of PAHs detected and quantified in complex environmental extracts using a single chromatographic run. Without clean-up, 7 additional compounds were detected and quantified in NIST SRM1975 using the LC-50×NSP-35 column combination. These results suggest that the use of the LC-50×NSP-35 column combination in GC×GC/ToF-MS not only results in better chromatographic resolution and greater orthogonality for the separation of complex PAH mixtures, but can also be used for the accurate quantification of complex PAH mixtures in environmental extracts without cleanup. PMID:23932031
Navarro, P; Cortazar, E; Bartolomé, L; Deusto, M; Raposo, J C; Zuloaga, O; Arana, G; Etxebarria, N
2006-09-22
The feasibility of different clean-up procedures was studied for the determination of polycyclic aromatic hydrocarbons (PAHs) in biota samples such as oysters, mussels and fish liver. In this sense, once the samples were extracted--essentially with acetone and in a microwave system--and before they could be analysed by gas chromatography-mass spectrometry (GC-MS), three different approaches were studied for the clean-up step: solid phase extraction (SPE), microwave-assisted saponification (MAS) and gel permeation chromatography (GPC). The main aim of this work was to maximise the recoveries of PAHs and to minimise the presence of interfering compounds in the last extract. In the case of SPE, Florisil cartridges of 1, 2 and 5 g, and silica cartridges of 5 g were studied. In that case, and with oysters and mussels, microwave-assisted extraction and 5 g Florisil cartridges provided good results. In addition, the concentrations obtained for Standard Reference Material (SRM) NIST 2977 (mussel tissue) were in good agreement with the certified values. In the case of microwave-assisted saponification, the extracts were not as clean as those obtained with 5 g Florisil and this fact lead to overestimate the concentration of the heaviest PAHs. Finally, the cleanest extracts were obtained by GPC. The method was successfully applied to mussels, oysters and hake liver, and the results obtained for NIST 2977 (mussel tissue) were within the confidence interval of the certified reference material for most of the certified analytes.
SUPERFUND CLEANUPS AND INFANT HEALTH.
Currie, Janet; Greenstone, Michael; Moretti, Enrico
2011-05-01
We are the first to examine the effect of Superfund cleanups on infant health rather than focusing on proximity to a site. We study singleton births to mothers residing within 5km of a Superfund site between 1989-2003 in five large states. Our "difference in differences" approach compares birth outcomes before and after a site clean-up for mothers who live within 2,000 meters of the site and those who live between 2,000- 5,000 meters of a site. We find that proximity to a Superfund site before cleanup is associated with a 20 to 25% increase in the risk of congenital anomalies.
Kadoum, A M
1968-07-01
A simple, aqueous acetonitrile partition cleanup method for analyses of some common organophosphorus insecticide residues is described. The procedure described is for cleanup and quantitative recovery of parathion, methyl parathion, diazinon, malathion and thimet from different extracts. Those insecticides in the purified extracts of ground water, grain, soil, plant and animal tissues can be detected quantitatively by gas chromatography with an electron capture-detector at 0.01 ppm. Cleanup is satisfactory for paper and thin-layer chromatography for further identification of individual insecticides in the extracts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigsby V.P.
2009-02-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Udengaard, Niels; Knight, Richard; Wendt, Jesper
This final report presents the results of a four-year technology demonstration project carried out by a consortium of companies sponsored in part by a $25 million funding by the Department of Energy (DOE) under the American Recovery and Reinvestment Act (ARRA). The purpose of the project was to demonstrate a new, economical technology for the thermochemical conversion of woody biomass into gasoline and to demonstrate that the gasoline produced in this way is suitable for direct inclusion in the already existing gasoline pool. The process that was demonstrated uses the Andritz-Carbona fluidized-bed steam-oxygen gasification technology and advanced tar reforming catalyticmore » systems to produce a clean syngas from waste wood, integrated conventional gas cleanup steps, and finally utilizes Haldor Topsoe’s (Topsoe) innovative Topsoe Improved Gasoline Synthesis (TIGASTM) syngas-to-gasoline process. Gas Technology Institute (GTI) carried out the bulk of the testing work at their Flex Fuel development facility in Des Plaines, Illinois; UPM in Minnesota supplied and prepared the feedstocks, and characterization of liquid products was conducted in Phillips 66 labs in Oklahoma. The produced gasoline was used for a single-engine emission test at Southwest Research Institute (SwRI®) in San Antonio, TX, as well as in a fleet test at Transportation Research Center, Inc. (TRC Inc.) in East Liberty, Ohio. The project benefited from the use of existing pilot plant equipment at GTI, including a 21.6 bone dry short ton/day gasifier, tar reformer, Morphysorb® acid gas removal, associated syngas cleanup and gasifier feeding and oxygen systems.« less
Carpinteiro, I; Abuín, B; Ramil, M; Rodríguez, I; Cela, R
2012-01-01
A cost-effective and low solvent consumption method, based on the matrix solid-phase dispersion (MSPD) technique, for the determination of six benzotriazole UV absorbers in sediments is presented. Sieved samples (0.5 g) were first mixed in a mortar with a solid sorbent and then transferred to a polypropylene syringe containing a layer of clean-up co-sorbent. Analytes were eluted with a suitable solvent and further determined by gas chromatography with tandem mass spectrometry (GC-MS/MS). Under final conditions, diatomaceous earth and silica, deactivated to 10%, were used as inert dispersant and clean-up co-sorbent, respectively. Analytes were recovered using just 5 mL of dichloromethane, and this extract was concentrated and exchanged to 1 mL of isooctane. Further removal of co-extracted sulphur was achieved adding activated copper powder to final extracts, which were stored overnight, before injection in the GC-MS/MS system. The accuracy of the method was assessed with river and marine sediment samples showing different carbon contents and spiked at different concentrations in the range from 40 to 500 ng g(-1). Recoveries varied between 78% and 110% with associated standard deviations below 14%. The limits of quantification of the method stayed between 3 and 15 ng g(-1). Levels of target compounds in sediment samples ranged from not detected up to a maximum of 56 ng g(-1) for Tinuvin 328.
Pollution control: utility ships adapt for spill cleanups
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-02-01
A practical and cost effective approach to oil spill cleanup is being undertaken by Dutch companies. The approach involves constructing and equipping multi-use ships for pollution control. Usually, these ships are maintained in another type of service and come into use for spill cleanup only when needed. The use of these ships in pollution control is discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... superfund cleanup remediation efforts. To more effectively protect those efforts, the Coast Guard is... cleanup remediation process in those waters. These caps consist of approximately three feet of sand and... remediation efforts that underlie the whole concept of the proposed RNA, and we would consult with the City of...
29 CFR 1955.44 - Final decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Final decision. 1955.44 Section 1955.44 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED..., the Secretary shall issue a final decision ruling upon each exception and objection filed. The final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seales, Maxian B.; Dilmore, Robert; Ertekin, Turgay
Horizontal wells combined with successful multi-stage hydraulic fracture treatments are currently the most established method for effectively stimulating and enabling economic development of gas bearing organic-rich shale formations. Fracture cleanup in the Stimulated Reservoir Volume (SRV) is critical to stimulation effectiveness and long-term well performance. However, fluid cleanup is often hampered by formation damage, and post-fracture well performance frequently falls below expectations. A systematic study of the factors that hinder fracture fluid cleanup in shale formations can help optimize fracture treatments and better quantify long term volumes of produced water and gas. Fracture fluid cleanup is a complex process influencedmore » by multi-phase flow through porous media (relative permeability hysteresis, capillary pressure etc.), reservoir rock and fluid properties, fracture fluid properties, proppant placement, fracture treatment parameters, and subsequent flowback and field operations. Changing SRV and fracture conductivity as production progresses further adds to the complexity of this problem. Numerical simulation is the best, and most practical approach to investigate such a complicated blend of mechanisms, parameters, their interactions, and subsequent impact on fracture fluid cleanup and well deliverability. In this paper, a 3-dimensional, 2-phase, dual-porosity model was used to investigate the impact of multiphase flow, proppant crushing, proppant diagenesis, shut-in time, reservoir rock compaction, gas slippage, and gas desorption on fracture fluid cleanup, and well performance in Marcellus shale. The research findings have shed light on the factors that substantially constrains efficient fracture fluid cleanup in gas shales, and provided guidelines for improved fracture treatment designs and water management.« less
Mental disorders among Chernobyl cleanup workers from Estonia: A clinical assessment.
Laidra, Kaia; Rahu, Kaja; Kalaus, Katri-Evelin; Tekkel, Mare; Leinsalu, Mall
2017-08-01
To assess, at a clinical level, the mental health of former Chernobyl cleanup workers from Estonia by comparing them with same-age controls. The Mini International Neuropsychiatric Interview (MINI) was administered during 2011-2012 to 99 cleanup workers and 100 population-based controls previously screened for mental health symptoms. Logistic regression analysis showed that cleanup workers had higher odds of current depressive disorder (odds ratio [OR] = 3.07, 95% confidence interval [CI: 1.34, 7.01]), alcohol dependence (OR = 3.47, 95% CI [1.29, 9.34]), and suicide ideation (OR = 3.44, 95% CI [1.28, 9.21]) than did controls. Except for suicide ideation, associations with Chernobyl exposure became statistically nonsignificant when adjusted for education and ethnicity. A quarter of a century after the Chernobyl accident, Estonian cleanup workers were still at increased risk of mental disorders, which was partly attributable to sociodemographic factors. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
1999-10-01
Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closuremore » report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, Charles W.
Radioactive waste tank SY-101 is one of 177 big underground tanks that store waste from decades of plutonium production at the Hanford Nuclear Reservation in central Washington State. The chemical reactions and radioactivity in all the tanks make bubbles of flammable gas, mainly hydrogen along with a little methane and ammonia. But SY-101 was the most potent gas producer of all. Every few months the gas built up in the million gallons of extra-thick slurry until it suddenly came up in great rushing ''burps''. A few of the tank's larger burps let off enough gas to make the air spacemore » at the top of the tank flammable for a few hours. This flammable gas hazard became a dominating force in DOE nuclear waste management politics in the last two decades of the 20th century. It demanded the toil of scientists, managers, and officials from the time it was filled in 1980, until it was finally declared safe in January 2001. The tank seemed almost a personality--acting with violence and apparent malice, hiding information about itself, deceiving us with false indications, and sometimes lulling us into complacency only to attack in a new way. From 1990 through 1993, SY-101's flammable gas troubles were acknowledged as the highest priority safety issue in the entire DOE complex. Uncontrolled crust growth demanded another high-priority remedial effort from 1998 through April 2000. The direct cost of the bubbles, toils, and troubles was high. Overall, the price of dealing with the real and imagined hazards in SY-101 may have reached $250 million. The indirect cost was also high. Spending all this money fighting SY-101?s safety issues only stirred radioactive waste up and moved it around, but accomplished no cleanup whatever. Worse yet, the flammable gas problem spawned suspicions of a much wider danger that impeded and complicated cleanup in other 176 waste tanks for a decade. The real cleanup job has yet to be done. The SY-101 story is really about the collective experience of people, from pervasive misconception to grand insight, near miss to sweeping success, meddling interference to close teamwork, all on an uncommonly large scale. It was a necessary catharsis that transformed the entire Hanford culture from a closed defense production operation to an open environmental cleanup project. Its tight project discipline and close teamwork became the Hanford standard. The final remediation of SY-101 placed second in an international ''project of the year'' competition. Many consider SY-101 work the peak of their careers and measure all other experience by it. SY-101 defines some of the worst and the best of Hanford history. This book attempts to narrate and explain the whole vast story.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feist, E.T.
2012-07-01
Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less
The Reduction of Risk Perception: Consensus-Making versus Truth-Seeking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawless, W.F.; Whitton, J.
2006-07-01
We concluded last year that the U.S. Department of Energy's (DOE's) policy of consensus-seeking (CR) for its Citizen Advisory Boards (CAB's or Boards) promoted risk mis-perception, a lack of education, and an anti-science bias about DOE's mission to cleanup its sites. Our conclusions countered an earlier study of the CAB's funded by DOE; using only subjective data, it had concluded that consensus-seeking was an improvement in American democracy. However, our conclusion was reached by comparing decision-making at the CAB's with results in the field at the DOE sites associated with the Boards. To extend our earlier findings, we looked atmore » recent meetings of the Board Chairs and preliminary results from the laboratory. We hypothesize that CR and the truth-seeking from majority rules (MR) reflect a tradeoff between a single world view derived from risk perceptions versus specific guidance from risk determinations. Based on both the field evidence and preliminary data from the experiment, we find that this tradeoff impacts site operations. At DOE's Hanford site, the risk perceptions of its Advisory Board (HAB) have contributed to 'gridlock'; at DOE's Savannah River Site (SRS), the specific recommendations by its Board (SAB) have contributed to accelerating cleanup. (authors)« less
Hot Cell Liners Category of Transuranic Waste Stored Below Ground within Area G
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, Robert Wesley; Hargis, Kenneth Marshall
2014-09-01
A large wildfire called the Las Conchas Fire burned large areas near Los Alamos National Laboratory (LANL) in 2011 and heightened public concern and news media attention over transuranic (TRU) waste stored at LANL’s Technical Area 54 (TA-54) Area G waste management facility. The removal of TRU waste from Area G had been placed at a lower priority in budget decisions for environmental cleanup at LANL because TRU waste removal is not included in the March 2005 Compliance Order on Consent (Reference 1) that is the primary regulatory driver for environmental cleanup at LANL. The Consent Order is an agreementmore » between LANL and the New Mexico Environment Department (NMED) that contains specific requirements and schedules for cleaning up historical contamination at the LANL site. After the Las Conchas Fire, discussions were held by the U.S. Department of Energy (DOE) with the NMED on accelerating TRU waste removal from LANL and disposing it at the Waste Isolation Pilot Plant (WIPP). This report summarizes available information on the origin, configuration, and composition of the waste containers within the Hot Cell Liners category; their physical and radiological characteristics; the results of the radioassays; and the justification to reclassify the five containers as LLW rather than TRU waste.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hargis, Kenneth Marshall
A large wildfire called the Las Conchas Fire burned large areas near Los Alamos National Laboratory (LANL) in 2011 and heightened public concern and news media attention over transuranic (TRU) waste stored at LANL’s Technical Area 54 (TA-54) Area G waste management facility. The removal of TRU waste from Area G had been placed at a lower priority in budget decisions for environmental cleanup at LANL because TRU waste removal is not included in the March 2005 Compliance Order on Consent (Reference 1) that is the primary regulatory driver for environmental cleanup at LANL. The Consent Order is a settlementmore » agreement between LANL and the New Mexico Environment Department (NMED) that contains specific requirements and schedules for cleaning up historical contamination at the LANL site. After the Las Conchas Fire, discussions were held by the U.S. Department of Energy (DOE) with the NMED on accelerating TRU waste removal from LANL and disposing it at the Waste Isolation Pilot Plant (WIPP). This report summarizes available information on the origin, configuration, and composition of the waste containers within the Tritium Packages and 17th RH Canister categories; their physical and radiological characteristics; the results of the radioassays; and potential issues in retrieval and processing of the waste containers.« less
29 CFR 801.73 - Final decision of the Secretary.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 3 2010-07-01 2010-07-01 false Final decision of the Secretary. 801.73 Section 801.73 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR OTHER LAWS... Vacation of Decision and Order of Administrative Law Judge § 801.73 Final decision of the Secretary. The...
39 CFR 501.6 - Suspension and revocation of authorization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... decision of PT shall become a final decision of the Postal Service. The appeal may be filed with the Chief Information Officer of the Postal Service and must include all supporting evidence and state with specificity... Information Officer shall constitute a final decision of the Postal Service. (f) An order or final decision...
USDA-ARS?s Scientific Manuscript database
Fusaric acid is a phytotoxin and mycotoxin occasionally found in maize contaminated with Fusarium fungi. A selective sample clean-up procedure was developed to detect fusaric acid in maize using molecularly imprinted solid phase extraction (MISPE) clean-up coupled with ion-pair liquid chromatography...
Environmental Liabilities: DoD Training Range Cleanup Cost Estimates Are Likely Understated
2001-04-01
1Federal accounting standards define environmental cleanup costs as...report will not be complete or accurate. Federal financial accounting standards have required that DOD report a liability for the estimated cost of...within the range is better than any other amount. SFFAS No. 6, Accounting for Property, Plant, and Equipment, further defines cleanup costs as costs for
Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit
DOE Office of Scientific and Technical Information (OSTI.GOV)
L. D. Habel
2008-05-20
This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm.
SUPERFUND CLEANUPS AND INFANT HEALTH
Currie, Janet; Greenstone, Michael; Moretti, Enrico
2013-01-01
We are the first to examine the effect of Superfund cleanups on infant health rather than focusing on proximity to a site. We study singleton births to mothers residing within 5km of a Superfund site between 1989–2003 in five large states. Our “difference in differences” approach compares birth outcomes before and after a site clean-up for mothers who live within 2,000 meters of the site and those who live between 2,000– 5,000 meters of a site. We find that proximity to a Superfund site before cleanup is associated with a 20 to 25% increase in the risk of congenital anomalies. PMID:25152535
Judd, Nancy; Lowney, Yvette; Anderson, Paul; Baird, Suzanne; Bay, Steven M; Breidt, Jay; Buonanduci, Michele; Dong, Zhao; Essig, Don; Garry, Michael R; Jim, Rebecca C; Kirkwood, Gemma; Moore, Shelly; Niemi, Cheryl; O'Rourke, Rory; Ruffle, Betsy; Schaider, Laurel A; Vidal-Dorsch, Doris E
2015-11-01
The use and interpretation of fish consumption surveys and interviews, the application of fish consumption rates for sediment evaluation and cleanup, and the development of human health water quality criteria (HH WQC) are complex and interrelated issues. The present article focuses on these issues using examples from the United States, although the issues may be relevant for other countries. Some key considerations include the fact that there are many types of fish consumption surveys (e.g., 24-h recall surveys, food frequency questionnaires, creel surveys), and these surveys have different advantages and limitations. Identification of target populations for protection, identification of the species and quantities of fish consumed, and determination of bioaccumulation assumptions are important factors when developing water quality and sediment screening levels and standards. Accounting for the cultural importance of fish consumption for some populations is an even more complex element. Discussions about HH WQC often focus only on the fish consumption rate and may not have broad public input. Some states are trying to change this through extensive public participation efforts and use of probabilistic approaches to derive HH WQC. Finally, there are limits to what WQC can achieve. Solutions beyond the establishment of WQC that target toxics reduction from other sources may provide the greatest improvements to water quality and reductions in human health risks in the future. © 2015 SETAC.
Samanidou, Victoria; Filippou, Olga; Marinou, Eirini; Kabir, Abuzar; Furton, Kenneth G
2017-06-01
Fabric-phase sorptive extraction has already been recognized as a simple and green alternative to the conventional sorbent-based sorptive microextraction techniques, using hybrid organic-inorganic sorbent coatings chemically bonded to a flexible fabric surface. Herein, we have investigated the synergistic combination of the advanced material properties offered by sol-gel graphene sorbent and the simplicity of Fabric phase sorptive extraction approach in selectively extracting bisphenol A and residual monomers including bisphenol A glycerolatedimethacrylate, urethane dimethacrylate, and triethylene glycol dimethacrylate derived dental restorative materials from cow and human breast milk samples. Different coatings were evaluated. Final method development employed sol-gel graphene coated media. The main experimental parameters influencing extraction of the compounds, such as sorbent chemistry used, sample loading conditions, elution solvent, sorption stirring time, elution time, impact of protein precipitation, amount of sample, and matrix effect, were investigated and optimized. Absolute recovery values from standard solutions were 50% for bisphenol A, 78% for T triethylene glycol dimethacrylate, 110% for urethane dimethacrylate, and 103% for bisphenol A glycerolatedimethacrylate, while respective absolute recovery values from milk were 30, 52, 104, and 42%. Method validation was performed according to European Decision 657/2002/EC in terms of selectivity, sensitivity, linearity, accuracy, and precision. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Gluntz, Douglas M.; Taft, William E.
1994-01-01
A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.
Clean-up and disposal process of polluted sediments from urban rivers.
He, P J; Shao, L M; Gu, G W; Bian, C L; Xu, C
2001-10-01
In this paper, the discussion is concentrated on the properties of the polluted sediments and the combination of clean-up and disposal process for the upper layer heavily polluted sediments with good flowability. Based on the systematic analyses of various clean-up processes, a suitable engineering process has been evaluated and recommended. The process has been applied to the river reclamation in Yangpu District of Shanghai City, China. An improved centrifuge is used for dewatering the dredged sludge, which plays an important role in the combination of clean-up and disposal process. The assessment of the engineering process shows its environmental and technical economy feasibility, which is much better than that of traditional dredging-disposal processes.
28 CFR 94.52 - Final agency decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Final agency decision. 94.52 Section 94.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Appeal Procedures § 94.52 Final agency decision. In cases...
28 CFR 94.52 - Final agency decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Final agency decision. 94.52 Section 94.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Appeal Procedures § 94.52 Final agency decision. In cases...
28 CFR 94.52 - Final agency decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Final agency decision. 94.52 Section 94.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Appeal Procedures § 94.52 Final agency decision. In cases...
28 CFR 94.52 - Final agency decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Final agency decision. 94.52 Section 94.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Appeal Procedures § 94.52 Final agency decision. In cases...
28 CFR 94.52 - Final agency decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Final agency decision. 94.52 Section 94.52 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Appeal Procedures § 94.52 Final agency decision. In cases...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.20 Section 8.20 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Disciplinary Procedure § 8.20 Final decision. Each...
Gold Run Pass - Div. of Mining, Land, and Water
issuing a Final Findings of Fact and Decision for the renewal of the Gold Run Pass Mine permits. Documents : Final Findings and Decision(PDF)(Posted 9/2/2016) Public Notice of Final Findings and Decision (PDF
50 CFR 11.16 - Final administrative decision.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Final administrative decision. 11.16... TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS CIVIL PROCEDURES Assessment Procedure § 11.16 Final administrative decision. (a) Where no request...
Cleanups In My Community (CIMC) - Recovery Act Funded Cleanups, National Layer
This data layer provides access to Recovery Act Funded Cleanup sites as part of the CIMC web service. The American Recovery and Reinvestment Act was signed into law by President Obama on February 17th, 2009 and all reporting on ARRA for these 3 programs was complete as of 2013. Out of the five EPA programs that distributed recovery act funding, three of them were cleanup programs: Brownfields, Superfund and Leaking Underground Storage Tanks. CIMC provides information on site cleanups that received ARRA Recovery Act funding for Superfund and Brownfields, but not Leaking Underground Storage Tanks. Data for Brownfields came from the ACRES database. Data for Superfund came from the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) database. Data in CIMC no longer need to be updated for the ARRA program. For information on all EPA Recovery Act funded work, please see: http://archive.epa.gov/recovery/web/html/ and http://epamap17.epa.gov/arra/.
Gluzman, D F; Sklyarenko, L M; Nadgornaya, V A; Zavelevich, M P
2011-03-01
The data on the verified cases of mature B-cell neoplasms (chronic lymphocytic leukemia - CLL, B-prolymphocytic leukemia, non-Hodgkin's lymphoma in leukemization phase and multiple myeloma - MM; 146 cases in total) in the consecutive group of Ukrainian clean-up workers within 10-25 years after Chernobyl accident are summarized. B-cell neoplasms represent the most prevalent group among all diagnosed neoplasms of hematopoietic and lymphoid tissues in clean-up worker patients under study (49.4%). MM percentage in the patients of Chernobyl clean-up worker group turned out to be significantly higher than in the patients of the general populations studied at the same period. While the percentage of B-CLL is similar in clean-up worker patients and patients of general population, the trend towards younger age of patients with mature B-cell neoplasms in clean-up worker group is evident. The current concepts on the possible association between mature B-cell neoplasms (mainly B-CLL) and radiation exposure are briefly outlined. Only the precise diagnosis of hematopoietic malignancies combining with large-scale analytical epidemiological studies with careful dose assessment and long-term follow-up may represent the basis for resolving the question whether mature B-cell neoplasms may be radiogenic.
5 CFR 511.612 - Finality of decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
....612 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLASSIFICATION UNDER THE GENERAL SCHEDULE Classification Appeals § 511.612 Finality of decision. An appellate decision made by the Office is final unless reconsidered by the Office. There is no further right of appeal. The...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.28 Section 8.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Summary Actions § 8.28 Final decision. Each exchange shall...
Laser intensity scaling through stimulated scattering in optical fibers
NASA Astrophysics Data System (ADS)
Russell, Timothy H.
The influence of stimulated scattering on laser intensity in fiber optic waveguides is examined. Stimulated Brillouin scattering (SBS) in long, multimode optical waveguides is found to generate a Stokes beam that propagates in the fiber LP01 mode. This characteristic of the Stokes beam was first applied to beam cleanup, where an aberrated pump generated a Gaussian-like Stokes beam. Additionally, the same process is found to combine multiple laser beams into a single spatially coherent source. The mean square difference between the two beams was used to measure the degree of spatial overlap, demonstrating spatial coherence between the Stokes beams even when the pump beams are not spatially correlated. This result is obtained regardless of whether the pump beams are at the same or different frequencies; producing two temporally coherent or incoherent Stokes beams respectively. Limitations in beam cleanup and combining are also examined to identify ways to overcome them. Output couplers are designed that could be used to spatially filter the Stokes beam from the pump, thus increasing the number of beams that could be combined. The combined power restriction induced by second order Stokes threshold is examined experimentally and theoretically and is not found to be a significant limitation. Finally, stimulated Raman scattering (SRS) beam cleanup is examined to overcome the stringent spectral requirements on the pump beams required by SBS. The last portion of the dissertation theoretically examines suppression of stimulated Raman scattering in fibers to eliminate the restriction this imposes on the power of a fiber laser or amplifier. The suppression was modeled using both a holmium dopant and adding a long period grating to the fiber. Both methods were shown to have a significant effect on the SRS threshold.
Code of Federal Regulations, 2010 CFR
2010-07-01
... all comments received during the public comment period (see § 124.208) in making your final permit decision. In addition, many requirements in subpart A of this part apply to the public comment period, public hearings, and preparation of your final permit decision. In preparing a final permit decision, the...
Machackova, Jirina; Wittlingerova, Zdena; Vlk, Kvetoslav; Zima, Jaroslav
2012-01-01
Biodegradation of petroleum hydrocarbons (TPH), mainly jet fuel, had taken place at the former Soviet Army air base in the Czech Republic. The remediation of large-scale petroleum contamination of soil and groundwater has provided valuable information about biosparging efficiency in the sandstone sedimentary bedrock. In 1997 petroleum contamination was found to be present in soil and groundwater across an area of 28 hectares, divided for the clean-up purpose into smaller clean-up fields (several hectares). The total estimated quantity of TPH released to the environment was about 7,000 metric tons. Biosparging was applied as an innovative clean-up technology at the site and was operated over a 10-year period (1997-2008). Importance of a variety of factors that affect bacterial activity in unsaturated and saturated zones was widely studied on the site and influence of natural and technological factors on clean-up efficiency in heavily contaminates areas of clean-up fields (initial contaminant mass 111-452 metric ton/ha) was evaluated. Long-term monitoring of the groundwater temperature has shown seasonal rises and falls of temperature which have caused a fluctuation in biodegradation activity during clean-up. By contrast, an overall rise of average groundwater temperature was observed in the clean-up fields, most probably as a result of the biological activity during the clean-up process. The significant rise of biodegradation rates, observed after air sparging intensification, and strong linear correlation between the air injection rates and biodegradation activities have shown that the air injection rate is the principal factor in biodegradation efficiency in heavily contaminated areas. It has a far more important role for achieving a biodegradation activity than the contamination content which appeared to have had only a slight effect after the removal of about 75% of initial contamination.
Can Shale Safely Host U.S. Nuclear Waste?
NASA Astrophysics Data System (ADS)
Neuzil, C. E.
2013-07-01
Even as cleanup efforts after Japan's Fukushima disaster offer a stark reminder of the spent nuclear fuel (SNF) stored at nuclear plants worldwide, the decision in 2009 to scrap Yucca Mountain as a permanent disposal site has dimmed hope for a repository for SNF and other high-level nuclear waste (HLW) in the United States anytime soon. About 70,000 metric tons of SNF are now in pool or dry cask storage at 75 sites across the United States [Government Accountability Office, 2012], and uncertainty about its fate is hobbling future development of nuclear power, increasing costs for utilities, and creating a liability for American taxpayers [Blue Ribbon Commission on America's Nuclear Future, 2012].
2001-02-01
liquids or residues from process pipes and tanks. The contractor also dismantled plutonium - processing furnaces, stripped out contaminated process...Soil Cleanup Levels on the Scope and Cost of the 903 Pad Cleanup 30 Figures Figure 1: Workers in Protective Clothing Handling Plutonium - Contaminated ...activities—shipping nuclear materials such as plutonium - contaminated metals and powders—is expected to be completed in 2002. Another activity
Gluntz, D.M.; Taft, W.E.
1994-12-20
A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling. 1 figure.
Cole, Rossa W.; Zoll, August H.
1982-01-01
In a gas turbine power plant having a pressurized fluidized bed combustor, gas turbine-air compressor subsystem and a gas clean-up subsystem interconnected for fluid flow therethrough, a pipe communicating the outlet of the compressor of the gas turbine-air compressor subsystem with the interior of the pressurized fluidized bed combustor and the gas clean-up subsystem to provide for flow of compressed air, heated by the heat of compression, therethrough. The pressurized fluidized bed combustor and gas clean-up subsystem are vented to atmosphere so that the heated compressed air flows therethrough and loses heat to the interior of those components before passing to the atmosphere.
39 CFR 963.20 - Final agency decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 39 Postal Service 1 2010-07-01 2010-07-01 false Final agency decision. 963.20 Section 963.20 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO VIOLATIONS OF THE PANDERING ADVERTISEMENTS STATUTE, 39 U.S.C. 3008 § 963.20 Final agency decision. The...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
... continued comprehensive protection of Washington's coastal resources. OCRM did not select either Alternative... Record of Decision and Final Findings of Approvability to the Washington Coastal Zone Management Program... and Coastal Resource Management. ACTION: Notice of Availability or Record of Decision and Final...
20 CFR 702.348 - Formal hearings; preparation of final decision and order; content.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Formal hearings; preparation of final decision and order; content. 702.348 Section 702.348 Employees' Benefits EMPLOYMENT STANDARDS... final decision and order; content. Within 20 days after the official termination of the hearing as...
Code of Federal Regulations, 2010 CFR
2010-07-01
... on behalf of the applicant; (4) The decision of the DRB; (5) Advisory opinions relief upon for the final action; and (6) The final action on the DRB decision by the Commandant or Secretary. (b) The... the decision of the DRB and the final action thereon is made available for public inspection and...
Mikolajczuk, Agnieszka; Przyk, Elzbieta Perez; Geypens, Benny; Berglund, Michael; Taylor, Philip
2010-03-01
Compound specific isotopic analysis (CSIA) can provide information about the origin of analysed compounds - in this case, polycyclic aromatic hydrocarbons (PAHs). In the study, PAHs were extracted from three dust samples: winter and summer filter dust and tunnel dust. The measurement was performed using the method validated in our laboratory using pure, solid compounds and EPA 610 reference assortment. CSIA required an appropriate clean-up method to avoid an unresolved complex in the gas chromatographic analysis usually found in the chromatography of PAHs. Extensive sample clean-up for this particular matrix was found to be necessary to obtain good gas chromatography-combustion-isotope ratio mass spectrometry analysis results. The sample purification method included two steps in which the sample is cleaned up and the aliphatic and aromatic hydrocarbons are separated. The concentration of PAHs in the measured samples was low; so a large volume injection technique (100 microl) was applied. The delta(VPDB)(13)C was measured with a final uncertainty smaller than 1 per thousand. Comparison of the delta(VPDB)(13)C signatures of PAHs extracted from different dust samples was feasible with this method and, doing so, significant differences were observed.
Zhang, Yixiang; Gao, Peng; Xing, Zhuo; Jin, Shumei; Chen, Zhide; Liu, Lantao; Constantino, Nasie; Wang, Xinwang; Shi, Weibing; Yuan, Joshua S.; Dai, Susie Y.
2013-01-01
High abundance proteins like ribulose-1,5-bisphosphate carboxylase oxygenase (Rubisco) impose a consistent challenge for the whole proteome characterization using shot-gun proteomics. To address this challenge, we developed and evaluated Polyethyleneimine Assisted Rubisco Cleanup (PARC) as a new method by combining both abundant protein removal and fractionation. The new approach was applied to a plant insect interaction study to validate the platform and investigate mechanisms for plant defense against herbivorous insects. Our results indicated that PARC can effectively remove Rubisco, improve the protein identification, and discover almost three times more differentially regulated proteins. The significantly enhanced shot-gun proteomics performance was translated into in-depth proteomic and molecular mechanisms for plant insect interaction, where carbon re-distribution was used to play an essential role. Moreover, the transcriptomic validation also confirmed the reliability of PARC analysis. Finally, functional studies were carried out for two differentially regulated genes as revealed by PARC analysis. Insect resistance was induced by over-expressing either jacalin-like or cupin-like genes in rice. The results further highlighted that PARC can serve as an effective strategy for proteomics analysis and gene discovery. PMID:23943779
Rules based process window OPC
NASA Astrophysics Data System (ADS)
O'Brien, Sean; Soper, Robert; Best, Shane; Mason, Mark
2008-03-01
As a preliminary step towards Model-Based Process Window OPC we have analyzed the impact of correcting post-OPC layouts using rules based methods. Image processing on the Brion Tachyon was used to identify sites where the OPC model/recipe failed to generate an acceptable solution. A set of rules for 65nm active and poly were generated by classifying these failure sites. The rules were based upon segment runlengths, figure spaces, and adjacent figure widths. 2.1 million sites for active were corrected in a small chip (comparing the pre and post rules based operations), and 59 million were found at poly. Tachyon analysis of the final reticle layout found weak margin sites distinct from those sites repaired by rules-based corrections. For the active layer more than 75% of the sites corrected by rules would have printed without a defect indicating that most rulesbased cleanups degrade the lithographic pattern. Some sites were missed by the rules based cleanups due to either bugs in the DRC software or gaps in the rules table. In the end dramatic changes to the reticle prevented catastrophic lithography errors, but this method is far too blunt. A more subtle model-based procedure is needed changing only those sites which have unsatisfactory lithographic margin.
40 CFR 124.15 - Issuance and effective date of permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Administrator shall issue a final permit decision (or a decision to deny a permit for the active life of a RCRA... final permit decision (or a decision to deny a permit for the active life of a RCRA hazardous waste... decision unless: (1) A later effective date is specified in the decision; or (2) Review is requested on the...
40 CFR 124.15 - Issuance and effective date of permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Administrator shall issue a final permit decision (or a decision to deny a permit for the active life of a RCRA... final permit decision (or a decision to deny a permit for the active life of a RCRA hazardous waste... decision unless: (1) A later effective date is specified in the decision; or (2) Review is requested on the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bridges, Donald
2012-07-01
This Paper reflects my views on some of the difficulties and successes in seeking and reflecting the opinions and input of the typical citizen relative to the Savannah River Site (SRS) cleanup programs. These views are based on four years of membership on the SRS Citizens Advisory Board (CAB). The Savannah River Site Citizens Advisory Board was established by Department of Energy- Environmental Management in 1994 with the goal of improving cleanup decisions by reflecting priorities and concerns of stakeholders and generally improving communication with the public, particularly in the areas most impacted by site operations. The SRS CAB hasmore » been a successful venture and has had a notable record of accomplishments with approximately 285 recommendations over its 17-year history. Many of these recommendations have been very specific and have impacted Site priorities on many issues of concern to the public. However, attaining this success and truly reflecting the views of the typical citizen is a difficult proposition. This concept begs such questions as: where do you get the input? how do you get these views? and how do you know when you've gotten it right? As a Board we have had to deal with groups who seem to have a bias either in favor of or strongly opposed to certain cleanup actions or other groups who have a total focus on a single topic such as jobs. It is our role to ensure that a balanced approach is adopted which reflects the sentiments of the general public. After some four years experience on the Board I have formulated a few ideas that should make the Board one that more completely reflects public sentiments and makes useful thoughtful input. Therefore, this paper looks at the manner and difficulty of seeking input and generally communicating with the public while offering some views on how to improve the process. The Citizens Advisory Board was envisioned as a body of private citizens who looked at cleanup activities of the Site and reflected the public view and input as the Site carried out the EM mission. In my view this body has carried out that mandate. Over its 17-year history the CAB has been diligent in its duties and enthusiastic in its involvement. The CAB has been energetic, active, and innovative in their work. The SRS CAB has developed a number of innovative and effective measures to serve the public good by improving the internal procedures to make the Board more informed and the external processes to make the public more involved. This paper described some of the more useful measures, which have assisted in that pursuit. This work has resulted in numerous recommendations that have led to many improvements in Site cleanup. By any measure this body of work by the CAB is a noteworthy success. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moren, Richard J.; Grindstaff, Keith D.
Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richlandmore » Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.« less
29 CFR 18.41 - Summary decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Summary decision. 18.41 Section 18.41 Labor Office of the... ADMINISTRATIVE LAW JUDGES General § 18.41 Summary decision. (a) No genuine issue of material fact. (1) Where no.... Any final decision issued as a summary decision shall conform to the requirements for all final...
Cleanup/stimulation of a horizontal wellbore using propellants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rougeot, J.E.; Lauterbach, K.A.
1993-01-01
This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellants. The Wilson 25 is a Bartlesville Sand well located in the Flatrock Field, Osage County, Oklahoma. The Wilson 25 was drilled to determine if horizontal drilling could be used as a means to economically recover primary oil that had been left in place in a mostly abandoned oil field because of the adverse effects of water coning. Pump testing of the Wilson 25 horizontal well bore before cleanup or stimulation produced 6 barrels of oil and .84 barrels of water per day. The high percentage ofmore » daily oil production to total daily fluid production indicated that the horizontal well bore had accessed potentially economical oil reserves if the fluid production rate could be increased by performing a cleanup/stimulation treatment. Propellants were selected as an inexpensive means to stimulate and cleanup the near well bore area in a uniform manner. The ignition of a propellant creates a large volume of gas which penetrates the formation, creating numerous short cracks through which hydrocarbons can travel into the well bore. More conventional stimulation/cleanup techniques were either significantly more expensive, less likely to treat uniformly, or could not be confined to the near well bore area. Three different propellant torpedo designs were tested with a total of 304' of horizontal well bore being shot and producible. The initial test shot caused 400' of the horizontal well bore to become plugged off, and subsequently it could not be production tested. The second and third test shots were production tested, with the oil production being increased 458% and 349%, respectively, on a per foot basis. The Wilson 25 results indicate that a propellant shot treatment is an economically viable means to cleanup/stimulate a horizontal well bore.« less
Problems and limitations of voluntary cleanup programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, S.F.
1995-12-31
At least a dozen states have already implemented voluntary cleanup programs (VCPs). Provisions to promote state VCPs were prominent in the EPA`s 1994 proposed revisions to CERCLA and in current legislative initiatives. Under the VCP, property owners voluntarily enroll to investigate and remediate contaminated sites with the aegis of a state agency and thus avoid involvement with the federal Superfund program. When the state agency is satisfied with the condition of the site, it issues a certificate to the owner. The VCP is meant to mitigate unintended consequences of CERCLA such as the economic abandonment of urban industrial sites inmore » favor of unpolluted suburban sites. The VCP concept has been combined with other reforms including cleanup standards, financial incentives, and independent action. The effectiveness of voluntary cleanup programs is limited by the costs of investigation and cleanup relative to the value of the property in question. It is also limited when property has environmental problems outside the traditional focus of state Superfund agencies on soil and groundwater contamination. VCPs also have potential unintended consequences of their own. The VCP concept is consistent with a 15 year trend of increasing government attention and involvement with sites of diminishing health and environmental significance. VCP may reinforce the perception of liability and unwittingly raise the standard of due diligence in property assessments, especially if combined with generic cleanup standard.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BLACKFORD LT
In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Centralmore » Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.« less
Goryacheva, I Yu; De Saeger, S; Lobeau, M; Eremin, S A; Barna-Vetró, I; Van Peteghem, C
2006-09-01
An approach for ochratoxin A (OTA) fast cost-effective screening based on clean-up tandem immunoassay columns was developed and optimized for OTA detection with a cut-off level of 10 microg kg(-1) in spices. Two procedures were tested and applied for OTA detection. Column with bottom detection immunolayer was optimized for OTA determination in Capsicum ssp. spices. A modified clean-up tandem immunoassay procedure with top detection immunolayer was successfully applied for all tested spices. Its main advantages were decreasing of the number of analysis steps and quantity of antibody and also minimizing of matrix effects. The total duration of the extraction and analysis was about 40 min for six samples. Chilli, red pepper, pili-pili, cayenne, paprika, nutmeg, ginger, white pepper and black pepper samples were analyzed for OTA contamination by the proposed clean-up tandem immunoassay procedures. Clean-up tandem immunoassay results were confirmed by HPLC-MS/MS with immunoaffinity column clean-up. Among 17 tested Capsicum ssp. spices, 6 samples (35%) contained OTA in a concentration exceeding the 10 microg kg(-1) limit discussed by the European Commission. All tested nutmeg (n=8), ginger (n=5), white pepper (n=7) and black pepper (n=6) samples did not contain OTA above this action level.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...
42 CFR 456.126 - Time limits for final decision and notification of adverse decision.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Hospitals Ur Plan: Review of Need for Admission 1 § 456.126 Time limits for final... 42 Public Health 4 2011-10-01 2011-10-01 false Time limits for final decision and notification of...
42 CFR 456.137 - Time limits for final decision and notification of adverse decision.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Hospitals Ur Plan: Review of Need for Continued Stay § 456.137 Time limits for final... 42 Public Health 4 2011-10-01 2011-10-01 false Time limits for final decision and notification of...
42 CFR 456.137 - Time limits for final decision and notification of adverse decision.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Hospitals Ur Plan: Review of Need for Continued Stay § 456.137 Time limits for final... 42 Public Health 4 2010-10-01 2010-10-01 false Time limits for final decision and notification of...
42 CFR 456.126 - Time limits for final decision and notification of adverse decision.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Hospitals Ur Plan: Review of Need for Admission 1 § 456.126 Time limits for final... 42 Public Health 4 2010-10-01 2010-10-01 false Time limits for final decision and notification of...
Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and order of the TSA decision maker on appeal. 1503.659 Section 1503.659 Transportation Other... Practice in TSA Civil Penalty Actions § 1503.659 Petition to reconsider or modify a final decision and order of the TSA decision maker on appeal. (a) General. Any party may petition the TSA decision maker to...
Küsters, Markus; Gerhartz, Michael
2010-04-01
For the determination of glyphosate, aminomethylphosphonic acid and glufosinate in drinking water, different procedures of enrichment and cleanup were examined using anion exchange or SPE. In many cases interactions of, e.g. alkaline earth metal ions especially calcium could be observed during enrichment and cleanup resulting in loss of analytes. For that reason, a novel cleanup and enrichment procedure for the determination of these phosphonic acid herbicides has been developed in drinking water using cation-exchange resin. In summary, the cleanup procedure with cation-exchange resin developed in this study avoids interactions as described above and is applicable to calcium-rich drinking water samples. After derivatization with 9-fluorenylmethylchloroformate followed by LC with fluorescence detection, LOD of 12, 14 and 12 ng/L and mean recoveries from real-world drinking water samples of 98+/-9, 100+/-16 and 101+/-11% were obtained for glyphosate, aminomethylphosphonic acid and glufosinate, respectively. The low LODs and the high precision permit the analysis of these phosphonic acid herbicides according to the guidelines of the European Commission.
Meo, Sultan Ayoub; Al-Drees, Abdul Majeed; Rasheed, Shahzad; Meo, Imran Mu; Al-Saadi, Muslim M; Ghani, Hamza A; Alkandari, Jasem Ramadan
2009-01-01
Oil spillage in the sea water is a disaster for marine life and humans in the vicinity. The study aimed at investigating health complaints among subjects involved in oil cleanup operations during a spillage from a Greek oil tanker "Tasman Spirit". The project was conducted under the supervision of the Department of Physiology, College of Medicine, King Khalid University Hospital, King Saud University, Riyadh, Saudi Arabia. The study concerned the respiratory and general health complaints in 50 apparently healthy, non-smoking male workers exposed to crude oil during oil cleanup operations. The exposed group was matched with a similar number of male, non-smoking controls. The health complaints were evaluated based on a comprehensive interview. The subjects involved in oil cleanup operations had significantly higher rates of health complaints including cough (38%), runny nose (36%), eye irritation/redness (32%), sore throat (28%), headache (28%), nausea (24%) and general illness (18%), compared to their matched controls. Air pollution due to crude oil spillage into sea water may cause respiratory and general health complaints in workers involved in oil cleanup operations.
Ates, Ebru; Mittendorf, Klaus; Senyuva, Hamide
2013-01-01
An automated sample preparation technique involving cleanup and analytical separation in a single operation using an online coupled TurboFlow (RP-LC system) is reported. This method eliminates time-consuming sample preparation steps that can be potential sources for cross-contamination in the analysis of plasticizers. Using TurboFlow chromatography, liquid samples were injected directly into the automated system without previous extraction or cleanup. Special cleanup columns enabled specific binding of target compounds; higher MW compounds, i.e., fats and proteins, and other matrix interferences with different chemical properties were removed to waste, prior to LC/MS/MS. Systematic stepwise method development using this new technology in the food safety area is described. Selection of optimum columns and mobile phases for loading onto the cleanup column followed by transfer onto the analytical column and MS detection are critical method parameters. The method was optimized for the assay of 10 phthalates (dimethyl, diethyl, dipropyl, butyl benzyl, diisobutyl, dicyclohexyl, dihexyl, diethylhexyl, diisononyl, and diisododecyl) and one adipate (diethylhexyl) in beverages and milk.
Chiesa, Luca; Pavlovic, Radmila; Dusi, Guglielmo; Pasquale, Elisa; Casati, Alessio; Panseri, Sara; Arioli, Francesco
2015-01-01
The debate about the origins of boldenone in bovine urine is ongoing for two decades in Europe. Despite the fact that its use as a growth promoter has been banned in the European Union (EU) since 1981, its detection in bovine urine, in the form of α-boldenone conjugate, is considered fully compliant up to 2 ng mL(-1). The conjugated form of β-boldenone must be absent. In recent years, the literature about boldenone has focused on the identification of biomarkers that can indicate an illicit treatment. β-boldenone sulfate is a candidate molecule, even if the only studies currently available have taken place in small populations. In this study, a method for the determination of sulfate and glucuronate conjugates of β-boldenone was developed and validated according to the European Commission Decision 2002/657/EC and applied to α-boldenone sulfate and glucuronide, α- and β-boldenone free forms and androstadienedione (ADD), too. The clean-up with immunoaffinity columns enabled the direct determination of the conjugates and free forms and allowed specific and sensitive analyses of urine samples randomly selected to verify this method. The decision limits (CCα) ranged between 0.07 and 0.08 ng mL(-1), the detection capabilities (CCβ) between 0.08 and 0.1 ng mL(-1). Recovery was higher than 92% for all the analytes. Intra-day repeatability was between 5.8% and 17.2%, and inter-day repeatability was between 6.0% and 21.8% for the studied free and conjugated forms. This method has been developed as a powerful tool with the aim to study the origin of boldenone in a trial on a significant number of animals. Copyright © 2014 Elsevier B.V. All rights reserved.
Streamlining Site Cleanup in New York City
This joint effort, supported by the New York State Department of Environmental Conservation (NYS DEC), advances the environmental cleanup goals of PlaNYC 2030, the city's comprehensive sustainability plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-07-15
The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less
TECHNICAL APPROACHES TO CHARACTERIZING AND ...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will need to base assessment and cleanup activities on the conditions of the particular sites with which they are dealing. A site assessment strategy should address: the type and extent of contamination, if any, that is present, the types of data needed to adequately assess the site; appropriate sampling and analytical methods to characterize the contamination; acceptable level of uncertainty and cleanup technologies that contain or treat the types of wastes present.This document includes references to state agency roles including the Voluntary Cleanup Program, public involvement and other guidances that may be used. Information
Pang, Guo-Fang; Fan, Chun-Lin; Chang, Qiao-Ying; Li, Yan; Kang, Jian; Wang, Wen-Wen; Cao, Jing; Zhao, Yan-Bing; Li, Nan; Li, Zeng-Yin; Chen, Zong-Mao; Luo, Feng-Jian; Lou, Zheng-Yun
2013-01-01
A comparative study was conducted over three stages on the cleanup efficiency of SPE cartridge Cleanert TPT, newly developed for multigroups of pesticide residues in tea. In Stage I, different SPE cartridges C18, graphite carbon black (GCB), primary secondary amine (PSA), and amino (NH2) were purchased and combined into 12 different sequences. Through the comparative test on cleanup efficiency of 84 representative pesticides in tea, Envi-Carb GCB + PSA with a good cleanup effect was selected. In Stage II, GC/MS test results from the comparative study of the extraction efficiency of 201 pesticides spiked into green tea and Woolong tea with Cleanert TPT and Envi-Carb + PSA SPE showed that average recoveries fell within 70-110% and RSD <20% for 193 and 184 pesticides, respectively, for green tea, accounting for 96.0 and 91.0% of the total number, respectively. GC/MS/MS test results also found 193 and 184 pesticides, respectively, meeting the recovery and RSD conditions, accounting for 96.0 and 91.5%, respectively, of the total number. For Woolong tea samples, GC/MS results showed that with Cleanert TPT and Envi-Carb + PSA SPE for cleanup, there were 192 and 177 pesticides, respectively, meeting the conditions, accounting for 95.5 and 88.1% of the total number, respectively. GC/MS/MS results demonstrated that there were 195 and 184 pesticides, respectively, meeting the conditions, accounting for 97.0 and 91.5% of the total number, respectively. It was seen that Cleanert TPT was superior to Envi-Carb + PSA in cleanup efficiency, whether for green or Woolong tea samples, or GC/MS or GC/MS/MS determination. In Stage III, 61104 results of the average content value of pesticides and RSD (two teas xtwo Youden pair concentrations x two kinds of SPE cartridges x two instruments x 19 tests x 201 pesticides) were derived from the 19 times stability tests over 3 months by paralleling three samples every 5 days via two instruments with two kinds of SPE cartridges for cleanup, respectively, against Youden Pair samples of the 201 incurred pesticides from green and Woolong teas. The statistical analysis found that detected values from the target pesticides of the incurred Youden pair samples showed no marked differences with cleanup by either Cleanert TPT or Envi-Carb + PSA, whether for green or Woolong tea, or G/IMS or G/IM/IMS. The test results using the two aforementioned kinds of SPE cleanup for above 93% pesticides had a tolerance less than 15%, which testifies that both cartridge cleanups met the requirement for pesticide residue analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2009-01-01
Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE).more » In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.« less
Tackling the Challenge of Deep Vadose Zone Remediation at the Hanford Site
NASA Astrophysics Data System (ADS)
Morse, J. G.; Wellman, D. M.; Gephart, R.
2010-12-01
The Central Plateau of the Hanford Site in Washington State contains some 800 waste disposal sites where 1.7 trillion liters of contaminated water was once discharged into the subsurface. Most of these sites received liquids from the chemical reprocessing of spent uranium fuel to recover plutonium. In addition, 67 single shell tanks have leaked or are suspected to have leaked 3.8 million liters of high alkali and aluminate rich cesium-contaminated liquids into the sediment. Today, this inventory of subsurface contamination contains an estimated 550,000 curies of radioactivity and 150 million kg (165,000 tons) of metals and hazardous chemicals. Radionuclides range from mobile 99Tc to more immobilized 137Cs, 241Am, uranium, and plutonium. A significant fraction of these contaminants likely remain within the deep vadose zone. Plumes of groundwater containing tritium, nitrate, 129I and other contaminants have migrated through the vadose zone and now extend outward from the Central Plateau to the Columbia River. During most of Hanford Site history, subsurface studies focused on groundwater monitoring and characterization to support waste management decisions. Deep vadose zone studies were not a priority because waste practices relied upon that zone to buffer contaminant releases into the underlying aquifer. Remediation of the deep vadose zone is now central to Hanford Site cleanup because these sediments can provide an ongoing source of contamination to the aquifer and therefore to the Columbia River. However, characterization and remediation of the deep vadose zone pose some unique challenges. These include sediment thickness; contaminant depth; coupled geohydrologic, geochemical, and microbial processes controlling contaminant spread; limited availability and effectiveness of traditional characterization tools and cleanup remedies; and predicting contaminant behavior and remediation performance over long time periods and across molecular to field scales. The U.S Department of Energy recognizes these challenges and is committed to a sustained, focused effort of continuing to apply existing technologies where feasible while investing and developing in new innovative, field-demonstrated capabilities supporting longer-term basic and applied research to establish the technical underpinning for solving intractable deep vadose zone problems and implementing final remedies. This approach will rely upon Multi-Project Teams focusing on coordinated projects across multiple DOE offices, programs, and site contractors plus the facilitation of basic and applied research investments through implementing a Deep Vadose Zone Applied Field Research Center and other scientific studies.
Dyscirculatory encephalopathy in Chernobyl disaster clean-up workers (a 20-year study).
Podsonnaya, I V; Shumakher, G I; Golovin, V A
2010-05-01
Results obtained over 20-years of following 536 Chernobyl clean-up workers and 436 control subjects are presented. Dyscirculatory encephalopathy developed more frequently in persons exposed to radiation at age 30 years. As compared with the control group, workers were characterized by early onset of disease, faster progression, stable symptomatology for 5-6 years, and further progression of disease in the form of autonomic dysfunction, psycho-organic syndrome, and epilepsy. Major strokes were also more common in clean-up workers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and law: Review Committee makes final administrative decision. 200.245 Section 200.245 Housing and... Clearance Procedure § 200.245 Hearing Officer determines facts and law: Review Committee makes final administrative decision. The Hearing Officer will determine the facts and the law relevant to the issues and will...
Code of Federal Regulations, 2010 CFR
2010-10-01
... information may the Corporation consider in making final funding decisions? (a) The Corporation will seek to... 45 Public Welfare 4 2010-10-01 2010-10-01 false What other factors or information may the Corporation consider in making final funding decisions? 2522.470 Section 2522.470 Public Welfare Regulations...
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESPONSIBILITY ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member... well as the Proceeding Clerk and Secretary of the Commission, with a written notice of any final...
29 CFR 1910.7 - Definition and requirements for a nationally recognized testing laboratory.
Code of Federal Regulations, 2010 CFR
2010-07-01
... prejudice, at any time prior to the final decision by the Assistant Secretary in paragraph I.B.7.c. of this... writing by the close of the comment period. 6. Action after public comment—a. Final decision by Assistant... comment period. b. Public announcement. A copy of the Assistant Secretary's final decision will be...
Memorandum of the Establishment of Cleanup Levels for CERCLA Sites with Radioactive Contamination
This memorandum presents clarifying guidance for establishing protective cleanup levels for radioactive contamination at Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites.
Improving Sampling, Analysis, and Data Management for Site Investigation and Cleanup
The United States Environmental Protection Agency (EPA) supports the adoption of streamlined approaches to sampling, analysis, and data management activities conducted during site assessment, characterization, and cleanup.
Increased leukemia risk in Chernobyl cleanup workers
A new study found a significantly elevated risk for chronic lymphocytic leukemia among workers who were engaged in recovery and clean-up activities following the Chernobyl power plant accident in 1986.
Radiation Dose to Post-Chernobyl Cleanup Workers
Radiation dose calculation for post-Chernobyl Cleanup Workers in Ukraine - both external radiation exposure due to fallout and internal doses due to inhalation (I131 intake) or ingestion of contaminated foodstuffs.
Nuclear radiation cleanup and uranium prospecting
Mariella, Jr., Raymond P.; Dardenne, Yves M.
2016-02-02
Apparatus, systems, and methods for nuclear radiation cleanup and uranium prospecting include the steps of identifying an area; collecting samples; sample preparation; identification, assay, and analysis; and relating the samples to the area.
Nuclear radiation cleanup and uranium prospecting
Mariella, Jr., Raymond P.; Dardenne, Yves M.
2017-01-03
Apparatus, systems, and methods for nuclear radiation cleanup and uranium prospecting include the steps of identifying an area; collecting samples; sample preparation; identification, assay, and analysis; and relating the samples to the area.
Cleanup Verification Package for the 300-18 Waste Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. M. Capron
This cleanup verification package documents completion of remedial action for the 300-18 waste site. This site was identified as containing radiologically contaminated soil, metal shavings, nuts, bolts, and concrete.
Green Remediation Best Management Practices: Mining Sites
This fact sheet describes best management practices (BMPs) that can be used to reduce the environmental footprint of cleanup activities associated with common project components, cleanup phases, and implementation of remediation technologies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How can the Secretary cancel or modify a final... to the Cohort § 83.19 How can the Secretary cancel or modify a final decision to add a class of employees to the Cohort? (a) The Secretary can cancel a final decision to add a class to the Cohort, or can...
Online Hazardous Waste Cleanup Technical Resources
This issue paper is intended to give the reader examples of some online technical resources that can assist with hazardous waste cleanups in the Superfund, Resource Conservation and Recovery Act (RCRA), and Brownfields programs.
A Citizen's Guide to Drycleaner Cleanup
The State Coalition for Remediation of Drycleaners (SCRD) has prepared an easy-to-read guide explaining the drycleaner cleanup process and describing the technologies that are most commonly used to clean up contaminated drycleaner sites.
Tribal Lands Cleanup and Spill Prevention Programs
EPA takes strides to prevent and cleanup contamination and contaminated sites located on or near Tribal lands. Our programs work hand-in-hand with tribes to ensure we protect their health and the environment.
Hazardous Waste: Cleanup and Prevention.
ERIC Educational Resources Information Center
Vandas, Steve; Cronin, Nancy L.
1996-01-01
Describes the Superfund, a federal cleanup program created in response to growing public concern over the health and environmental risks posed by hazardous waste sites. Discusses sources, disposal, and movement and risk of hazardous waste. (JRH)
Workplace Safety: Indoor Environmental Quality
... Cleanup Tuberculosis Follow NIOSH Facebook Flickr Pinterest Twitter YouTube NIOSH Homepage NIOSH A-Z Workplace Safety & Health ... Cleanup Tuberculosis Follow NIOSH Facebook Flickr Pinterest Twitter YouTube NIOSH Homepage NIOSH A-Z Workplace Safety & Health ...
Burbank performs the scheduled extensive cleanup of ventilation systems
2012-02-22
ISS030-E-093414 (22 Feb. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs the scheduled extensive cleanup of ventilation systems in the Columbus laboratory of the International Space Station.
43 CFR 3931.30 - Suspension of operations and production.
Code of Federal Regulations, 2012 CFR
2012-10-01
... environmental studies or analysis; (2) To ensure that necessary environmental remediation or cleanup is being... environmental remediation or cleanup is being performed as a result of unwarranted or unexpected actions. (c...
43 CFR 3931.30 - Suspension of operations and production.
Code of Federal Regulations, 2013 CFR
2013-10-01
... environmental studies or analysis; (2) To ensure that necessary environmental remediation or cleanup is being... environmental remediation or cleanup is being performed as a result of unwarranted or unexpected actions. (c...
43 CFR 3931.30 - Suspension of operations and production.
Code of Federal Regulations, 2011 CFR
2011-10-01
... environmental studies or analysis; (2) To ensure that necessary environmental remediation or cleanup is being... environmental remediation or cleanup is being performed as a result of unwarranted or unexpected actions. (c...
43 CFR 3931.30 - Suspension of operations and production.
Code of Federal Regulations, 2014 CFR
2014-10-01
... environmental studies or analysis; (2) To ensure that necessary environmental remediation or cleanup is being... environmental remediation or cleanup is being performed as a result of unwarranted or unexpected actions. (c...
... visit this page: About CDC.gov . Mold Cleanup & Remediation Homeowner’s and Renter’s Guide to Mold Cleanup After ... Home or Building with Mold Damage Prevention and Remediation Strategies for the Control and Removal of Fungal ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This interim notice covers the following: extractable organic halides in solids, total organic halides, analysis by gas chromatography/Fourier transform-infrared spectroscopy, hexadecane extracts for volatile organic compounds, GC/MS analysis of VOCs, GC/MS analysis of methanol extracts of cryogenic vapor samples, screening of semivolatile organic extracts, GPC cleanup for semivolatiles, sample preparation for GC/MS for semi-VOCs, analysis for pesticides/PCBs by GC with electron capture detection, sample preparation for pesticides/PCBs in water and soil sediment, report preparation, Florisil column cleanup for pesticide/PCBs, silica gel and acid-base partition cleanup of samples for semi-VOCs, concentrate acid wash cleanup, carbon determination in solids using Coulometrics` CO{submore » 2} coulometer, determination of total carbon/total organic carbon/total inorganic carbon in radioactive liquids/soils/sludges by hot persulfate method, analysis of solids for carbonates using Coulometrics` Model 5011 coulometer, and soxhlet extraction.« less
Hazardous waste sites: voluntary industry cleanup proposed
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-02-27
A proposal that calls for the chemical industry to undertake voluntary cleanup of hazardous waste sites was presented recently to the Environmental Protection Agency and on Capitol Hill. And although still in draft form, the proposal has elicited a very favorable response. In its present form, the proposal calls for setting up a nonprofit holding company, supported by donations from the chemical industry, to plan and carry out cleanup operations. It is the result of nine months of discussion among representatives of industry, environmental groups, and former government personnel, carried out under the auspices of the Conservation Foundation to assessmore » what could be done to speed the cleanup of hazardous waste sites. Although still in draft form, the proposal already is getting excellent reviews. One Congressional staff member says that the idea of a voluntary program is excellent. And EPA sees it as a real opportunity to supplement its funds - which it has been saying are nowhere near adequte to clean up all the sites that it expects eventually to be placed on the national priorities list - and get the work done. All this, of course, would occur under the agency's watchful eye. Some in the environmental community fear that the mere discussion of a private cleanup exercise might be used as an argument for not reauthorizing Superfund or for not expanding the size of the fund. However, most see the voluntary cleanup as a supplement to, not a replacement for, the Superfund program.« less
20 CFR 349.8 - Discretion of the three-member Board to reopen or not to reopen a final decision.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Discretion of the three-member Board to reopen or not to reopen a final decision. 349.8 Section 349.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT FINALITY OF DECISIONS REGARDING UNEMPLOYMENT AND...
20 CFR 349.8 - Discretion of the three-member Board to reopen or not to reopen a final decision.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Discretion of the three-member Board to reopen or not to reopen a final decision. 349.8 Section 349.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT FINALITY OF DECISIONS REGARDING UNEMPLOYMENT AND...
NASA Technical Reports Server (NTRS)
Rusche, A. E.; Myers, V. I.
1974-01-01
Remote sensing data obtained from aerial reconnaissance of tornado damage to the city of Pierre, South Dakota on July 23, 1973 was evaluated to determine its value as a decision making and management tool in post-disaster restoration activities. The imaging techniques used are briefly discussed, and both aerial and closeup color photographs are provided which were used in the evaluation. The immediate advantages of the data are identified as a 'quick-look' assessment, and a list is given which outlines the additional advantages for which positive rescue and cleanup action may be initiated. Hail and flood damage evaluation, and remote sensing of crop damage due to insect of disease infestation is also briefly described.
Patterns of hematological malignancies in Chernobyl clean-up workers (1996-2005).
Gluzman, D; Imamura, N; Sklyarenko, L; Nadgornaya, V; Zavelevich, M; Machilo, V
2006-03-01
The question as to whether the incidence of leukemias and malignant lymphomas among the Chernobyl clean-up workers increased in 20 years after the catastrophe is still a point of much controversy. Precise diagnosis of the main forms of hematopoietic malignancies according to FAB classification and new WHO classification and comparison of these data with that in the general population will be helpful in estimating the relative contribution of the radiation factor to the overall incidence of such pathologies. The data on 218 consecutive cases of malignant diseases of hematopoietic and lymphoid tissues in Chernobyl clean-up workers diagnosed in 1996-2005 are given in comparison with the data of 2697 consecutive patients of general population of the same age group. The morphology and cytochemistry of bone marrow and peripheral blood cells were studied. Immunocytochemical techniques (APAAP, LSAB-AP) and the broad panel of monoclonal antibodies to lineage specific and differentiation antigens of leukocytes were employed for immunophenotyping leukemic cells. Various types of oncohematological diseases developing 10-20 years after Chernobyl accident were registered in a group of clean-up workers under study including myelodysplastic syndromes (MDS), acute leukemias (ALL and AML), chronic myelogenous leukemia (CML) and other chronic myeloproliferative diseases, chronic lymphocytic leukemia (B-CLL) and other chronic lymphoproliferative diseases of B and T cell origin. MDS percentage among patients of clean-up workers group tended to exceed MDS percentage in the group of patients representing the general population examined at the same period (4.58 vs. 3.70%). Among 34 AML cases, leukemia was preceded by MDS in seven patients. The relative contribution of CML to the total number of clean-up workers with leukemia was higher than the corresponding percentage value in general population examined at the same period (9.17 vs. 6.59%). B-CLL was a predominant form of hematopoietic malignancies in clean-up workers under study (25.68%). Nevertheless, B-CLL percentage in patients of clean-up workers group did not differ significantly from that in the patients of general population. The multiple myeloma percentage (7.79%) in the group of patients belonging to clean-up workers in our study turned out to be twice as much as in the patients of general population (4.0%). The verified diagnosis of tumors of hematopoietic and lymphoid tissue according to modern classification (EGIL, WHO) could be the prerequisite for further molecular genetic and analytical epidemiology study of leukemias that may be related to Chernobyl NPP accident consequences.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... National Historic Trail Feasibility Study/Abbreviated Final Environmental Impact Statement, National Trails... Decision on the Abbreviated Final Environmental Impact Statement for the Long Walk National Historic Trail... Final Environmental Impact Statement for the Long Walk National Historic Trail Feasibility Study...
Green Remediation Best Management Practices: Integrating Renewable Energy into Site Cleanup
The U.S. Environmental Protection Agency (EPA) Principles for Greener Cleanups outline the Agency's policy for evaluating and minimizing the environmental 'footprint' of activities undertaken when cleaning up a contaminated site.
Using the Triad Approach to Streamline Brownfields Site Assessment and Cleanup
EPA's Brownfields Technology Support Center (BTSC) has prepared this document to provide an educational tool for site owners, project managers, and regulators to help streamline assessment and cleanup activities at brownfields sites.
Brief Guide to Mold, Moisture, and Your Home
... your eyes. How Do I Know When the Remediation or Cleanup is Finished? You must have completely ... water or moisture problem before the cleanup or remediation can be considered finished. You should have completed ...
76 FR 10018 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
... Idaho's 2015 Cleanup Vision Government Budget Cycle American Recovery and Reinvestment Act Idaho Cleanup.... The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-15
...'s Republic of China: Court Decision Not in Harmony With Final Results and Amended Final Results of... unpublished judgment the Department of Commerce's (``the Department'') final results of redetermination as...). See Final Results of Redetermination Pursuant to Voluntary Remand, Court No. 09-00246, dated July 30...
Utilizing the right mix of environmental cleanup technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitaker, Wade; Bergren, Chris; Flora, Mary
2007-07-01
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation.more » In the initial years of the SRS environmental cleanup program (early 1990's), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical / pH-adjusting injection, phyto-remediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baro-balls, electrical resistance heating, soil vapor extraction, and micro-blowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works pro-actively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup technologies. Remediating large, complex groundwater plumes using state of-the art technologies and approaches is a hallmark of years of experience and progress. Environmental restoration at SRS continues to be a challenging and dynamic process as new cleanup technologies and approaches are adopted. (authors)« less
Trevisan, Maria Teresa Salles; Owen, Robert Wyn; Calatayud-Vernich, Pau; Breuer, Andrea; Picó, Yolanda
2017-08-25
An analytical method using a quick, easy, cheap, effective, rugged and safe (QuEChERS) procedure for multi-residue determination of 52 pesticides in coffee leaf extractshas been developed and validated according to SANTE/11945/2015 guidelines. Different sorbent combinations for dispersive solid phase extraction (d-SPE) clean-up as well as dispersive liquid-liquid microextraction (DLLME) were tested. The relative standard deviations (RSDs) for the recovery of 87-94% of pesticides added to coffee leaf extracts,was ≤20% for samples spiked at concentrations up to 50ng*g -1 depending on the clean-up procedures. However, samples spiked with a 100ng*g -1 pesticide mixture gave RSDs>20% for most pesticides when d-SPE was carried out adding Supelclean ENVI-Carb 120/400. To explain this fact,the secondary metabolic profile was analyzed in all the extraction and clean-up procedures. Only in the clean-up procedure with the addition of Supel QuE Z-Sep+, does caffeine show a constant adsorption between blank and spiked samples. In other clean-up procedures, the amount of caffeine was higher in those samples spiked with pesticides. This indicates competition between caffeine and pesticides for adsorption to the sorbent. Addition of Supel QuE Z-Sep+ to the procedure revealed only a 32% matrix effect, whereas using PSA+ C18 the matrix effect was close to 97%. The process efficiency is up to 54% with the addition of Supel QuE Z-Sep+ and just up to 7% for the other clean-up procedures. The method was successfully tested in coffee leaves from different types of cultivars. Pesticides were not detected in organic coffee leaf extracts, but thiametoxan was clearly detected in 50% of coffee leaf extracts harvested from coffee trees grown under traditional conditions as determined by UHPLC-TOFMSLC/QqTOF-MS/MS. Copyright © 2017 Elsevier B.V. All rights reserved.
Zhao, Limian; Lucas, Derick; Long, David; Richter, Bruce; Stevens, Joan
2018-05-11
This study presents the development and validation of a quantitation method for the analysis of multi-class, multi-residue veterinary drugs using lipid removal cleanup cartridges, enhanced matrix removal lipid (EMR-Lipid), for different meat matrices by liquid chromatography tandem mass spectrometry detection. Meat samples were extracted using a two-step solid-liquid extraction followed by pass-through sample cleanup. The method was optimized based on the buffer and solvent composition, solvent additive additions, and EMR-Lipid cartridge cleanup. The developed method was then validated in five meat matrices, porcine muscle, bovine muscle, bovine liver, bovine kidney and chicken liver to evaluate the method performance characteristics, such as absolute recoveries and precision at three spiking levels, calibration curve linearity, limit of quantitation (LOQ) and matrix effect. The results showed that >90% of veterinary drug analytes achieved satisfactory recovery results of 60-120%. Over 97% analytes achieved excellent reproducibility results (relative standard deviation (RSD) < 20%), and the LOQs were 1-5 μg/kg in the evaluated meat matrices. The matrix co-extractive removal efficiency by weight provided by EMR-lipid cartridge cleanup was 42-58% in samples. The post column infusion study showed that the matrix ion suppression was reduced for samples with the EMR-Lipid cartridge cleanup. The reduced matrix ion suppression effect was also confirmed with <15% frequency of compounds with significant quantitative ion suppression (>30%) for all tested veterinary drugs in all of meat matrices. The results showed that the two-step solid-liquid extraction provides efficient extraction for the entire spectrum of veterinary drugs, including the difficult classes such as tetracyclines, beta-lactams etc. EMR-Lipid cartridges after extraction provided efficient sample cleanup with easy streamlined protocol and minimal impacts on analytes recovery, improving method reliability and consistency. Copyright © 2018 Elsevier B.V. All rights reserved.
Engineering Forum Issue Paper: Online Hazardous Waste Cleanup Technical Resources
This issue paper is intended to give the reader examples of some online technical resources that can assist with hazardous waste cleanups in the Superfund, Resource Conservation and Recovery Act (RCRA), and Brownfields programs.
24 CFR 598.215 - What are the purpose and content of the strategic plan?
Code of Federal Regulations, 2014 CFR
2014-04-01
... preserve the environment and historic landmarks, address “brownfields” clean-up and redevelopment, explore..., Environmental Cleanup Cost Deduction (i.e., “Brownfields Tax Incentive”), and the Work Opportunity Tax Credit...
24 CFR 598.215 - What are the purpose and content of the strategic plan?
Code of Federal Regulations, 2013 CFR
2013-04-01
... preserve the environment and historic landmarks, address “brownfields” clean-up and redevelopment, explore..., Environmental Cleanup Cost Deduction (i.e., “Brownfields Tax Incentive”), and the Work Opportunity Tax Credit...
24 CFR 598.215 - What are the purpose and content of the strategic plan?
Code of Federal Regulations, 2012 CFR
2012-04-01
... preserve the environment and historic landmarks, address “brownfields” clean-up and redevelopment, explore..., Environmental Cleanup Cost Deduction (i.e., “Brownfields Tax Incentive”), and the Work Opportunity Tax Credit...
EPA Completes Reviews of 14 New England Site Cleanups during FY’ 2017
EPA has completed comprehensive reviews of site cleanups at 14 National Priorities List Sites (Superfund Sites), including four Federal Facilities, across New England by performing required Five-Year Reviews of each site.
Report: EPA Needs to Track Compliance with Superfund Cleanup Requirements
Report #08-P-0141, April 28, 2008. According to EPA’s Superfund information system, there were 3,397 active Superfund enforcement instruments to ensure cleanups at National Priorities List sites as of September 30, 2007.
Introduction to Energy Conservation and Production at Waste Cleanup Sites
This issue paper, prepared by EPA's Engineering Forum under the Technical Support Project, provides an overview on the considerations for energy conservation and production during the design and (O&M) phases of waste cleanup projects.
EPA Begins Reviews of 24 New England Site Cleanups during Current Fiscal Year
EPA plans to conduct comprehensive reviews of site cleanups at 24 National Priorities List Sites (Superfund Sites), including two Federal Facilities, across New England by performing required Five-Year Reviews of sites.
The Great Oil Spill Cleanup Contest.
ERIC Educational Resources Information Center
Hampton, Elaine
1993-01-01
Presents an exciting way to acquaint students with current methods to clean up oil spills. Students also have the freedom to create new clean-up methods as they think through the problem and experiment to find effective solutions. (PR)
SOIL AND SEDIMENT SAMPLING METHODS | Science ...
The EPA Office of Solid Waste and Emergency Response's (OSWER) Office of Superfund Remediation and Technology Innovation (OSRTI) needs innovative methods and techniques to solve new and difficult sampling and analytical problems found at the numerous Superfund sites throughout the United States. Inadequate site characterization and a lack of knowledge of surface and subsurface contaminant distributions hinders EPA's ability to make the best decisions on remediation options and to conduct the most effective cleanup efforts. To assist OSWER, NERL conducts research to improve their capability to more accurately, precisely, and efficiently characterize Superfund, RCRA, LUST, oil spills, and brownfield sites and to improve their risk-based decision making capabilities, research is being conducted on improving soil and sediment sampling techniques and improving the sampling and handling of volatile organic compound (VOC) contaminated soils, among the many research programs and tasks being performed at ESD-LV.Under this task, improved sampling approaches and devices will be developed for characterizing the concentration of VOCs in soils. Current approaches and devices used today can lose up to 99% of the VOCs present in the sample due inherent weaknesses in the device and improper/inadequate collection techniques. This error generally causes decision makers to markedly underestimate the soil VOC concentrations and, therefore, to greatly underestimate the ecological
Code of Federal Regulations, 2011 CFR
2011-07-01
... for the assistance program. (2) For final decisions issued by a Regional disputes decision official, the request for review shall be filed with the Regional Administrator. If the Regional Administrator issued the final decision, the request for reconsideration shall be filed with the Regional Administrator...
Code of Federal Regulations, 2010 CFR
2010-07-01
... for the assistance program. (2) For final decisions issued by a Regional disputes decision official, the request for review shall be filed with the Regional Administrator. If the Regional Administrator issued the final decision, the request for reconsideration shall be filed with the Regional Administrator...
Nuclear waste transportation: case studies of identifying stakeholder risk information needs.
Drew, Christina H; Grace, Deirdre A; Silbernagel, Susan M; Hemmings, Erin S; Smith, Alan; Griffith, William C; Takaro, Timothy K; Faustman, Elaine M
2003-01-01
The U.S. Department of Energy (DOE) is responsible for the cleanup of our nation's nuclear legacy, involving complex decisions about how and where to dispose of nuclear waste and how to transport it to its ultimate disposal site. It is widely recognized that a broad range of stakeholders and tribes should be involved in this kind of decision. All too frequently, however, stakeholders and tribes are only invited to participate by commenting on processes and activities that are near completion; they are not included in the problem formulation stages. Moreover, it is often assumed that high levels of complexity and uncertainty prevent meaningful participation by these groups. Considering the types of information that stakeholders and tribes need to be able to participate in the full life cycle of decision making is critical for improving participation and transparency of decision making. Toward this objective, the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) participated in three public processes relating to nuclear waste transportation and disposal in 1997-1998. First, CRESP organized focus groups to identify concerns about nuclear waste transportation. Second, CRESP conducted exit surveys at regional public workshops held by DOE to get input from stakeholders on intersite waste transfer issues. Third, CRESP developed visual tools to synthesize technical information and allow stakeholders and tribes with varying levels of knowledge about nuclear waste to participate in meaningful discussion. In this article we share the results of the CRESP findings, discuss common themes arising from these interactions, and comment on special considerations needed to facilitate stakeholder and tribal participation in similar decision-making processes. PMID:12611653
Reger, Lea; Gallistl, Christoph; Skírnisson, Karl; Vetter, Walter
2017-08-01
Abiotic and biotic transformation of toxaphene (camphechlor) results in the selective enrichment of recalcitrant congeners while other, less persistent compounds of technical toxaphene (CTTs) are degraded. Until now, there has been little knowledge on oxidation transformation of toxaphene. For instance, the existence of hydroxylated CTTs (OH-CTTs) in authentic environmental and food samples has not been proven. For this reason, we synthesized a mixture consisting of tetra- to heptachlorinated OH-CTTs and simplified it by countercurrent chromatography (CCC). Thus, 227 OH-CTTs were detected in the CCC fractions (12 tetra-, 117 penta-, 81 hexa-, and 17 heptachlorinated OH-CTTs), which was >50% more than detected before the fractionation. One CCC fraction consisting of only 18 OH-CTTs was used to develop a sample cleanup method which aimed to remove CTTs, isobaric PCBs, and sample matrix. The final cleanup procedure consisted of (i) gel permeation chromatography (GPC) and adsorption chromatography using (ii) deactivated and (iii) activated silica gel. Hence, up to 320 and 4350 μg/kg lipid weight of octa- and nonachlorinated CTTs were detected in four liver samples and adipose tissue of polar bears, respectively. Furthermore, the presence of one hexachlorinated OH-CTT isomer could be verified in the samples, which was about 1% of the octachlorinated CTTs determined in the liver samples.
Fuentes, Edwar; Báez, María E; Díaz, Juan
2009-12-18
An effective extraction method was devised for the determination of organophosphorus pesticides (OPPs) in olive and avocado oil samples, using atmospheric pressure microwave-assisted liquid-liquid extraction (APMAE) and solid-phase extraction or low-temperature precipitation as clean-up step. A simple glass system equipped with an air-cooled condenser was designed as an extraction vessel. The pesticides were partitioned between acetonitrile and oil solution in hexane. Analytical determinations were carried out by gas chromatography-flame photometric detection and gas chromatography-tandem mass spectrometry, using a triple quadrupole mass analyzer, for confirmation purposes. Several factors influencing the extraction efficiency were investigated and optimized through fractional factorial design and Doehlert design. Under optimal conditions the recovery of pesticides from oil at 0.025 microg g(-1) ranged from 71% to 103%, except for fenthion in avocado oil, with RSDs < or = 13% (n=5). The LOQ for the entire method ranged from 0.004 to 0.015 microg g(-1). Finally, the proposed method was successfully applied to the extraction and determination of the selected pesticides in 20 commercially packed extra virgin olive oils and four commercially packed avocado oils produced in Chile. Detectable residues of different OPPs were observed in 85% of samples.
IMMUNOASSAY ANALYSIS FOR CHLORPYRIFOS IN FOODS
Chlorpyrifos is widely used in agriculture on fruits and vegetables. The tolerances for chlorpyrifos on produce range from 0.1-8.0 ppm. Residue detection is commonly performed by gas chromatography following various cleanup procedures. However, the required cleanup can make ...
20 CFR 30.320 - Can a claim be reopened after the FAB has issued a final decision?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Can a claim be reopened after the FAB has... AMENDED Adjudicatory Process Reopening Claims § 30.320 Can a claim be reopened after the FAB has issued a final decision? (a) At any time after the FAB has issued a final decision pursuant to § 30.316, and...
78 FR 21938 - Notice of Issuance of Final Air Permit; Architect of the Capitol-Capitol Power Plant
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... accordance with EPA's procedures for decision making set forth at 40 CFR part 124 and the Clean Air Act (CAA... decision in accordance with 40 CFR 52.21 and 40 CFR part 124 to issue the final PAL permit to CPP. The permit was signed on January 23, 2013, and notice of the final permit decision was provided in accordance...
Two Bull Mine - Div. of Mining, Land, and Water
27.21.080(d) and 11 AAC 90.129(b). DMLW - Mining is issuing a Final Findings of Fact and Decision for the renewal of the Two Bull Mine permit. Final Findings and Decision PDF (9/2/2016) Public Notice of Final Findings and Decision PDF (9/2/2016) Preliminary Findings of Fact PDF (3/11/2016) Public Notice PDF (3/11
Water Cycle Extremes: from Observations to Decisions
NASA Astrophysics Data System (ADS)
Lawford, R. G.; Unninayar, S.; Berod, D.
2015-12-01
Extremes in the water cycle (droughts and floods) pose major challenges for water resource managers and emergency services. These challenges arise from observational and prediction systems, advisory services, impact reduction strategies, and cleanup and recovery operations. The Group on Earth Observations (GEO) through its Water Strategy ("GEOSS Water Strategy: from observations to decisions") is seeking to provide systems that will enable its members to more effectively meet their information needs prior to and during an extreme event. This presentation reviews the wide range of impacts that arise from extremes in the water cycle and the types of data and information needed to plan for and respond to these extreme events. It identifies the capabilities and limitations of current observational and analysis systems in defining the scale, timing, intensity and impacts of water cycle extremes and in directing society's response to them. This summary represents an early preliminary assessment of the global and regional information needs of water resource managers and begins to outline a strategy within GEO for using Earth Observations and ancillary information to address these needs.
Henry, Heather; Naujokas, Marisa F; Attanayake, Chammi; Basta, Nicholas T; Cheng, Zhongqi; Hettiarachchi, Ganga M; Maddaloni, Mark; Schadt, Christopher; Scheckel, Kirk G
2015-08-04
Recently the Centers for Disease Control and Prevention lowered the blood Pb reference value to 5 μg/dL. The lower reference value combined with increased repurposing of postindustrial lands are heightening concerns and driving interest in reducing soil Pb exposures. As a result, regulatory decision makers may lower residential soil screening levels (SSLs), used in setting Pb cleanup levels, to levels that may be difficult to achieve, especially in urban areas. This paper discusses challenges in remediation and bioavailability assessments of Pb in urban soils in the context of lower SSLs and identifies research needs to better address those challenges. Although in situ remediation with phosphate amendments is a viable option, the scope of the problem and conditions in urban settings may necessitate that SSLs be based on bioavailable rather than total Pb concentrations. However, variability in soil composition can influence bioavailability testing and soil amendment effectiveness. More data are urgently needed to better understand this variability and increase confidence in using these approaches in risk-based decision making, particularly in urban areas.
10 CFR 430.49 - Finality of decision.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Finality of decision. (a) A decision to prescribe a rule that a State energy conservation standard, water conservation standard (in the case of faucets, showerheads, water closets, and urinals) or other requirement... DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS Petitions To...
10 CFR 430.49 - Finality of decision.
Code of Federal Regulations, 2013 CFR
2013-01-01
... DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS Petitions To... Finality of decision. (a) A decision to prescribe a rule that a State energy conservation standard, water conservation standard (in the case of faucets, showerheads, water closets, and urinals) or other requirement...
10 CFR 430.49 - Finality of decision.
Code of Federal Regulations, 2012 CFR
2012-01-01
... DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS Petitions To... Finality of decision. (a) A decision to prescribe a rule that a State energy conservation standard, water conservation standard (in the case of faucets, showerheads, water closets, and urinals) or other requirement...
10 CFR 430.49 - Finality of decision.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS Petitions To... Finality of decision. (a) A decision to prescribe a rule that a State energy conservation standard, water conservation standard (in the case of faucets, showerheads, water closets, and urinals) or other requirement...
10 CFR 430.49 - Finality of decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
... DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS Petitions To... Finality of decision. (a) A decision to prescribe a rule that a State energy conservation standard, water conservation standard (in the case of faucets, showerheads, water closets, and urinals) or other requirement...
This fact sheet provides an overview of the 10 on-line characterization and remediation databases available on the Hazardous Waste Clean-Up Information (CLU-IN) website sponsored by the U.S. Environmental Protection Agency.
Report #2004-P-00027, September 1, 2004. The five States have established hazardous waste site cleanup programs that address contaminated sites posing human health and environmental risks ranging from low to high.
40 CFR 761.366 - Cleanup equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Cleanup equipment. 761.366 Section 761.366 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT POLYCHLORINATED BIPHENYLS (PCBs) MANUFACTURING, PROCESSING, DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Double...
CONTAMINANTS AND REMEDIAL OPTIONS AT SELECTED METAL-CONTAMINATED SITES
This document provides information that facilitates characterization of the site and selection of treatment technologies at metals-contaminated sites that would be capable of meeting site-specific cleanup levels. he document does not facilitate the determination of cleanup levels...
Code of Federal Regulations, 2010 CFR
2010-07-01
... with the particular spill. These factors may mitigate expected exposures and risks or make cleanup to... spill situations in which site-specific risk factors may warrant additional cleanup to more stringent... numerical decontamination levels is clearly unwarranted because of risk-mitigating factors, that compliance...
Code of Federal Regulations, 2011 CFR
2011-07-01
... with the particular spill. These factors may mitigate expected exposures and risks or make cleanup to... spill situations in which site-specific risk factors may warrant additional cleanup to more stringent... numerical decontamination levels is clearly unwarranted because of risk-mitigating factors, that compliance...
Project #OPE-FY14-0044, July 22, 2014. The EPA OIG plans to begin preliminary research of the EPA's sampling, monitoring, communication and opportunities for cleanup efficiencies for the CTS Asheville Superfund Site, North Carolina.
Plating Inc. Site Fact Sheet: EPA to Begin Cleanup of Hazardous Waste
Hazardous waste cleanup and local community outreach around the Plating Inc. site at 888 N. Prior Ave.in St. Paul. The former industrial facility specialized in zinc and chromate plating of aluminum and is now abandoned.
48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.
Code of Federal Regulations, 2012 CFR
2012-10-01
....e., nuclear energy processing, industrial environmental cleanup); (iii) Construction of facilities... industrial/DOE settings (i.e., nuclear energy, chemical or petroleum processing, industrial environmental... industrial/DOE settings (i.e., nuclear energy, chemical processing, industrial environmental cleanup); (ii...
48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.
Code of Federal Regulations, 2014 CFR
2014-10-01
....e., nuclear energy processing, industrial environmental cleanup); (iii) Construction of facilities... industrial/DOE settings (i.e., nuclear energy, chemical or petroleum processing, industrial environmental... industrial/DOE settings (i.e., nuclear energy, chemical processing, industrial environmental cleanup); (ii...
48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.
Code of Federal Regulations, 2013 CFR
2013-10-01
....e., nuclear energy processing, industrial environmental cleanup); (iii) Construction of facilities... industrial/DOE settings (i.e., nuclear energy, chemical or petroleum processing, industrial environmental... industrial/DOE settings (i.e., nuclear energy, chemical processing, industrial environmental cleanup); (ii...
Flood Cleanup to Protect Indoor Air Quality
During a flood cleanup, the indoor air quality in your home or office may appear to be the least of your problems. However, failure to remove contaminated materials and to reduce moisture and humidity can present serious long-term health risks.
48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.
Code of Federal Regulations, 2010 CFR
2010-10-01
....e., nuclear energy processing, industrial environmental cleanup); (iii) Construction of facilities... industrial/DOE settings (i.e., nuclear energy, chemical or petroleum processing, industrial environmental... industrial/DOE settings (i.e., nuclear energy, chemical processing, industrial environmental cleanup); (ii...
48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.
Code of Federal Regulations, 2011 CFR
2011-10-01
....e., nuclear energy processing, industrial environmental cleanup); (iii) Construction of facilities... industrial/DOE settings (i.e., nuclear energy, chemical or petroleum processing, industrial environmental... industrial/DOE settings (i.e., nuclear energy, chemical processing, industrial environmental cleanup); (ii...
Glufosinate ammonium clean-up procedure from water samples using SPE
NASA Astrophysics Data System (ADS)
Tayeb M., A.; Ismail B., S.; Mardiana-Jansar, K.; Ta, Goh Choo; Agustar, Hani Kartini
2015-09-01
For the determination of glufosinate ammonium residue in soil and water samples, different solid phase extraction (SPE) sorbent efficiency was studied. Four different SPE sorbents i.e.: CROMABOND PS-H+, CROMABOND PS-OH-, ISOLUTE ENV+, Water Sep-Pak and OASIS HLB were used. Sample clean-up performance was evaluated using high performance liquid chromatography (Agilent 1220 infinity LC) with fluorescence detector. Detection of FMO-derivatives was done at λ ex = 260 nm and λ em= 310 nm. OASIS HLB column was the most suitable for the clean-up in view of the overall feasibility of the analysis.
Butenko, Z A; Smirnova, I A; Zak, K P; Mikhaĭlovskaia, E V; Ianok, E A; Kishinskaia, E G
1998-01-01
The results of molecular investigations of blood mononuclears from 120 clean-up workers after 7-9 years of Chernobyl accident with the total exposure radiation doses ranging from 5 to 76 cGr are presented. Structural polymorphism of the leukemia associated bcr and ribosomal RNA (rRNA) genes were studied using Southern blot hybridization. Allelic polymorphism of bcr gene with characteristic for leukemia allele distribution was detected in 16.6%. Rearrangements of rRNA genes were observed in 13% of Chernobyl accident clean-up workers.
Cheong, Hae-Kwan; Lee, Jong Seong; Kwon, Hojang; Ha, Eun-Hee; Hong, Yun-Chul; Choi, Yeyong; Jeong, Woo-Chul; Hur, Jongil; Lee, Seung-Min; Kim, Eun-Jung; Im, Hosub
2011-01-01
Objectives This study was conducted to examine the relationship between crude oil exposure and physical symptoms among residents participating in clean-up work associated with the Hebei Spirit oil spill, 2007 in Korea. Methods A total of 288 residents responded to a questionnaire regarding subjective physical symptoms, sociodemographic characteristics and clean-up activities that occurred between two and eight weeks after the accident. Additionally, the urine of 154 of the respondents was analyzed for metabolites of volatile organic compounds (VOCs) and polycyclic aromatic hydrocarbons (PAHs) and heavy metals. To compare the urinary levels of exposure biomarkers, the urine of 39 inland residents who were not directly exposed to the oil spill were analyzed. Results Residents exposed to oil remnants through clean-up work showed associations between physical symptoms and the exposure levels defined in various ways, including days of work, degree of skin contamination, and levels of some urinary exposure biomarkers of VOCs, metabolites and metals, although no major abnormalities in urinary exposure biomarkers were observed. Conclusions This study provides evidence of a relationship between crude oil exposure and acute human health effects and suggests the need for follow-up to evaluate the exposure status and long-term health effects of clean-up participants. PMID:22125768
Impact of pH on the stability and the cross-reactivity of ochratoxin A and citrinin.
Bazin, Ingrid; Faucet-Marquis, Virginie; Monje, Marie-Carmen; El Khoury, Micheline; Marty, Jean-Louis; Pfohl-Leszkowicz, Annie
2013-11-28
Mycotoxins are secondary metabolites produced by several fungi contaminating crops. In several countries, the maximum permitted levels of mycotoxins are found in foodstuffs and feedstuffs. The common strategy of mycotoxin analysis involves extraction, clean-up and quantification by chromatography. In this paper, we analyzed the reasons of underestimation of ochratoxin A (OTA) content in wine, and overestimation of OTA in wheat, depending on the pH of the clean-up step and the simultaneous presence of citrinin (CIT). We demonstrated that the increase of pH by adding polyethylene glycol (PEG) to wine led to an underestimation of OTA by conversion of OTA into open ring ochratoxin A OP-OA. In comparing three methods of extraction and clean-up for the determination of OTA and CIT in wheat--(i) an inter-laboratory validated method for OTA in cereals using immunoaffinity column clean-up (IAC) and extraction by acetonitrile/water; (ii) a validated method using IAC and extraction with 1% bicarbonate Na; and (iii) an in-house validated method based on acid liquid/liquid extraction--we observed an overestimation of OTA after immunoaffinity clean-up when CIT is also present in the sample, whereas an underestimation was observed when OTA was alone. Under neutral and alkaline conditions, CIT was partially recognized by OTA antibodies.
Impact of pH on the Stability and the Cross-Reactivity of Ochratoxin A and Citrinin
Bazin, Ingrid; Faucet-Marquis, Virginie; Monje, Marie-Carmen; El Khoury, Micheline; Marty, Jean-Louis; Pfohl-Leszkowicz, Annie
2013-01-01
Mycotoxins are secondary metabolites produced by several fungi contaminating crops. In several countries, the maximum permitted levels of mycotoxins are found in foodstuffs and feedstuffs. The common strategy of mycotoxin analysis involves extraction, clean-up and quantification by chromatography. In this paper, we analyzed the reasons of underestimation of ochratoxin A (OTA) content in wine, and overestimation of OTA in wheat, depending on the pH of the clean-up step and the simultaneous presence of citrinin (CIT). We demonstrated that the increase of pH by adding polyethylene glycol (PEG) to wine led to an underestimation of OTA by conversion of OTA into open ring ochratoxin A OP-OA. In comparing three methods of extraction and clean-up for the determination of OTA and CIT in wheat—(i) an inter-laboratory validated method for OTA in cereals using immunoaffinity column clean-up (IAC) and extraction by acetonitrile/water; (ii) a validated method using IAC and extraction with 1% bicarbonate Na; and (iii) an in-house validated method based on acid liquid/liquid extraction—we observed an overestimation of OTA after immunoaffinity clean-up when CIT is also present in the sample, whereas an underestimation was observed when OTA was alone. Under neutral and alkaline conditions, CIT was partially recognized by OTA antibodies. PMID:24287570
Progress on Footprint Reduction at the Hanford Site - 12406
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKenney, Dale E.; Seeley, Paul; Farabee, Al
2012-07-01
The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-termmore » stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)« less
16 CFR 700.8 - Warrantor's decision as final.
Code of Federal Regulations, 2010 CFR
2010-01-01
... jurisdiction over suits for breach of warranty and service contract. ... decision as final. A warrantor shall not indicate in any written warranty or service contract either... party is final or binding in any dispute concerning the warranty or service contract. Nor shall a...
7 CFR 1940.321 - Use of completed EIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... final EIS will be a major factor in the Agency's final decision. Agency staff making recommendations on...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED... subpart and provide them to the approving official prior to a final decision. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-12
... DEPARTMENT OF ENERGY Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition...-Level Waste and Facilities Disposition Final Environmental Impact Statement. This document corrects an... Record of Decision: Idaho High-Level Waste and Facilities [[Page 1616
Final Report, University Research Program in Robotics (URPR), Nuclear Facilities Clean-up
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tesar, Delbert; Kapoor, Chetan; Pryor, Mitch
This final report describes the research activity at the University of Texas at Austin with application to EM needs at DOE. This research activity is divided in to two major thrusts and contributes to the overall University Research Program in Robotics (URPR) thrust by providing mechanically oriented robotic solutions based on modularity and generalized software. These thrusts are also the core strengths of the UTA program that has a 40-year history in machine development, 30 years specifically devoted to robotics. Since 1975, much of this effort has been to establish the general analytical and design infrastructure for an open (modular)more » architecture of systems with many degrees of freedom that are able to satisfy a broad range of applications for future production machines. This work has coalesced from two principal areas: standardized actuators and generalized software.« less
Remedial Investigation of Hanford Site Releases to the Columbia River - 13603
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Hulstrom, L.C.; Sands, J.P.
2013-07-01
In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previouslymore » investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bowers-Irons, G.L.
1992-12-30
In recent years, new strict environmental laws have required improved and cost-effective water purification methods by Air Force complexes. Naturally assisted primary units (microbiological) and secondary units (macrophyte) could bring waste treatment systems into tighter compliance. Aquatic macrophytes which have rapid growth rates and absorb large quantities of nutrients could provide a practical and economic method for more complete wastewater maintenance, hazardous waste clean-up or river, lake and ground water purification. This work has shown that Lemna minor, or Common Duckweed, can successfully and thoroughly accumulate organics and metals from Air Force wastewaters.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Srivastava, V.J.; Hill, A.H.
1993-06-01
The goal of the project was to determine the technical feasibility of utilizing a novel concept in anaerobic digestion, in-situ methane enrichment digestion or MED for producing utility-grade gas from a pilot-scale anaerobic digester. MED tests conducted during this program consistently achieved digester product gas with a methane (CH4) content of greater than 90% (on a dry-, nitrogen-free basis). The MED concept, because it requires relatively simple equipment and modest energy input, has the potential to simplify gas cleanup requirements and substantially reduce the cost of converting wastes and biomass to pipeline quality gas.
Michaels, David; Howard, John
2012-01-01
Introduction: The fire and explosion of the Deepwater Horizon oil rig resulted in an enormous oil spill that threatened large distances of coastline. The overall response was led by the United States Coast Guard and involved the oil company BP, federal agencies, and state and local governments of five states. Methods: The Occupational Safety and Health Administration and the National Institute for Occupational Safety and Health focused extensive resources on ensuring that BP and its contractors provided safe working conditions for thousands of workers involved in the response. Federal personnel visited worksites daily, identifying hazards and means of abatement; assessed training programs to ensure that workers were adequately trained in languages they could understand; monitored chemical exposures and determined that the proper personal protective equipment was deployed; insisted on implementation of a heat mitigation program; rostered thousands of workers; and conducted extensive outreach in communities impacted by the spill. Results: Advance planning, immediate deployment, and collaboration across agencies helped ensure that the response operations resulted in no worker fatalities, and relatively few injuries and illnesses. Conclusions: For future responses, improvements should be made in how safety and health information, as well as the process behind safety and health decisions, are communicated to the public. Citation: Michaels D, Howard J. Review of the OSHA-NIOSH Response to the Deepwater Horizon Oil Spill: Protecting the Health and Safety of Cleanup Workers. PLoS Currents Disasters. 2012 Jul 18 PMID:24678440
Success of the Melton Valley Watershed Remediation at the ORNL - 12351
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adler, David; Wilkerson, Laura; Sims, Lynn
2012-07-01
The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Actionmore » Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)« less
Michaels, David; Howard, John
2012-07-18
The fire and explosion of the Deepwater Horizon oil rig resulted in an enormous oil spill that threatened large distances of coastline. The overall response was led by the United States Coast Guard and involved the oil company BP, federal agencies, and state and local governments of five states. The Occupational Safety and Health Administration and the National Institute for Occupational Safety and Health focused extensive resources on ensuring that BP and its contractors provided safe working conditions for thousands of workers involved in the response. Federal personnel visited worksites daily, identifying hazards and means of abatement; assessed training programs to ensure that workers were adequately trained in languages they could understand; monitored chemical exposures and determined that the proper personal protective equipment was deployed; insisted on implementation of a heat mitigation program; rostered thousands of workers; and conducted extensive outreach in communities impacted by the spill. Advance planning, immediate deployment, and collaboration across agencies helped ensure that the response operations resulted in no worker fatalities, and relatively few injuries and illnesses. For future responses, improvements should be made in how safety and health information, as well as the process behind safety and health decisions, are communicated to the public. Michaels D, Howard J. Review of the OSHA-NIOSH Response to the Deepwater Horizon Oil Spill: Protecting the Health and Safety of Cleanup Workers. PLoS Currents Disasters. 2012 Jul 18.
A System Dynamics Approach for the Selection of Contaminated Land Management Options
NASA Astrophysics Data System (ADS)
McKnight, U. S.; Kuebert, M.; Finkel, M.; Bieg, M.
2006-12-01
Large-scale contaminated land and groundwater is a widespread problem that can severely impact human health, the environment and the economy at many urban sites all over the world. Usually a considerable number of potential management solutions exist at each of these sites. A detailed investigation of all these options, however, is not economically feasible which makes streamlining of the planning and decision process a mandatory requirement. Decisions to be taken should be made as early as possible in order to reduce expenditures on site investigation. Therefore, a tiered decision-making procedure is required, including (i) identification and prioritization of focal areas of risks, (ii) feasibility screening of remediation targets and available management alternatives to narrow the range of possible options for (iii) subsequent detailed investigations of only a select group of preferable options. For each of these elements, tailored decision and investigation concepts are required. These concepts and applied methods should be specifically adapted to the type and scale of the particular decision to be taken- more target-oriented, cost-efficient investigation programs, as well as model-based assessment methods are needed (Ruegner et al. 2006). A gap exists within this framework with respect to preliminary assessment methodologies representing the first decision level. To fill this gap, a new system dynamics approach has been developed that represents the system of source- pathway-receptor sequences by means of a mass flux model. The dynamics are governed by the effects of possible remedial actions, which are described as mass flux change over time (Serapiglia et al. 2005). This approach has been implemented in the preliminary evaluation tool CARO-plus (Cost-efficiency Assessment of Remediation Options) that models the effects of potential remedial actions, including tackling the contaminant source and managing the groundwater plume. The model represents the causal relationships that exist between the state of the system, the effects of the technologies and their costs, and may considerably impact the outcome to be predicted. The tool enables a fast and effective "screening" of management scenarios using simplified approaches (analytical models). Replacing the concept of total cleanup of sites based on concentration standards, the evaluation tool contains risk modules that describe exposure pathways, i.e. transfer of contaminants from groundwater to the receptor "human being", in accordance to MEPAS (Strenge & Chamberlain 1995). As multiple lines of evidence may apply, the effects of remediation options can be analyzed on the basis of contaminant mass flux, concentrations, and/or risk indices (carcinogenic/noncarcinogenic). Costs are calculated in terms of net present values. Uncertainty is taken into account using Monte-Carlo sensitivity analyses. In the presentation, examples will be shown for how the proposed approach helps to pre-select compatible remediation options by giving an overview to the following set of questions: (i) what is the time scale for risks expected at a particular site, (ii) does the scenario reduce/control risk at the receptor, (iii) is the scenario compatible with cleanup objectives (e.g. in the case that concentration standards are still required for specific compounds present at a site), (iv) does the scenario satisfy cost objectives and can therefore be considered financially viable, (v) is the scenario acceptable to regulators and the community, and (vi) what factors are most critical to the decision-making process.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
... Bags From Thailand: Final Court Decision and Amended Final Results of Administrative Review of the... Thailand produced or exported by King Pac Industrial Co., Ltd. (King Pac) and Master Packaging Co., Ltd... administrative review of the antidumping duty order on PRCBs from Thailand covering the POR, in accordance with...
40 CFR 761.61 - PCB remediation waste.
Code of Federal Regulations, 2012 CFR
2012-07-01
... care centers, endangered species habitats, estuaries, wetlands, national parks, national wildlife... ACT POLYCHLORINATED BIPHENYLS (PCBs) MANUFACTURING, PROCESSING, DISTRIBUTION IN COMMERCE, AND USE... least 30 days prior to the date that the cleanup of a site begins, the person in charge of the cleanup...
An Evaluation of Public Preferences for Superfund Site Cleanup, Volume II: Pilot Study (1995)
In volume II, the authors present the detailed technical results of a pilot market research study that was conducted to determine preferences for the specific type and level of cleanup desired by the public at Superfund sites.
77 FR 10485 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... Status EM/National Nuclear Security Administration Integration Ecological Surveys Ground Water Waste Area... and site management in the areas of environmental restoration, waste management, and related... Idaho Cleanup Project (ICP) Workforce Reductions Advanced Mixed Waste Cleanup Project (AMWTP) Workforce...
Private-Sector Cleanup Expenditures and Transaction Costs at 18 Superfund Sites (1993)
Superfund allows the government either to clean up a site and recover its cost from the potentially responsible parties (PRPs) or to require the PRPs to undertake the cleanup themselves. This study examines private-sector expenditures and transaction-costs
40 CFR 147.3015 - Information to be considered for Class III wells.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes § 147.3015 Information to... quality as required for aquifer cleanup by § 147.3011 of this subpart. (3) An aquifer cleanup plan if...
40 CFR 147.3015 - Information to be considered for Class III wells.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes § 147.3015 Information to... quality as required for aquifer cleanup by § 147.3011 of this subpart. (3) An aquifer cleanup plan if...
An Introduction to the Cost of Engineering and Institutional Controls at Brownfield Properties
This fact sheet introduces and explores the costs of site cleanup and, where cleanup leaves site contamination that restricts reuse, outlines the engineering and institutional controls and their monitoring and maintenance costs over a longer time frame.
EPA Science Matters Newsletter: Greener Cleanups at Hazardous Waste Sites (Published August 2013)
Read about the EPA’s Smart Energy Resources Guide (SERG). The guide covers techniques for superfund managers to reduce cleanup emissions in a process called green remediation, and can be used by any site remediation and redevelopment manager.
5 CFR 2610.309 - Agency review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Administrative Personnel OFFICE OF GOVERNMENT ETHICS ORGANIZATION AND PROCEDURES IMPLEMENTATION OF THE EQUAL... initial decision on the application shall become a final decision of the Office of Government Ethics 30... (or his or her designee, if any). If review is taken, the Office will issue a final decision on the...
17 CFR 171.21 - Notice of final decision.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Futures Association shall promptly serve all parties, as well as the Proceedings Clerk and the Secretary... decision issued by the National Futures Association. (b) Content of the notice. At a minimum, the notice... notice. (1) If the National Futures Association issues a notice of a final decision subject to these...
17 CFR 171.21 - Notice of final decision.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Futures Association shall promptly serve all parties, as well as the Proceedings Clerk and the Secretary... decision issued by the National Futures Association. (b) Content of the notice. At a minimum, the notice... notice. (1) If the National Futures Association issues a notice of a final decision subject to these...
17 CFR 171.21 - Notice of final decision.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Futures Association shall promptly serve all parties, as well as the Proceedings Clerk and the Secretary... decision issued by the National Futures Association. (b) Content of the notice. At a minimum, the notice... notice. (1) If the National Futures Association issues a notice of a final decision subject to these...
17 CFR 171.21 - Notice of final decision.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Futures Association shall promptly serve all parties, as well as the Proceedings Clerk and the Secretary... decision issued by the National Futures Association. (b) Content of the notice. At a minimum, the notice... notice. (1) If the National Futures Association issues a notice of a final decision subject to these...
17 CFR 171.21 - Notice of final decision.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Futures Association shall promptly serve all parties, as well as the Proceedings Clerk and the Secretary... decision issued by the National Futures Association. (b) Content of the notice. At a minimum, the notice... notice. (1) If the National Futures Association issues a notice of a final decision subject to these...
20 CFR 802.406 - Finality of Board decisions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Finality of Board decisions. 802.406 Section 802.406 Employees' Benefits BENEFITS REVIEW BOARD, DEPARTMENT OF LABOR RULES OF PRACTICE AND PROCEDURE... period for filing such petition for review will run from the issuance of the Board's decision on...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... DEPARTMENT OF THE INTERIOR National Park Service National Park Service Benefits-Sharing Final Environmental Impact Statement Record of Decision AGENCY: National Park Service, Department of the Interior.... 4332(2)(C), the National Park Service announces the availability of the Record of Decision for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
...] Final Environmental Impact Statement and Record of Decision for Alabama Beach Mouse General Conservation... mouse (Peromyscus polionotus ammobates). For record of decision (ROD) availability, see DATES. DATES... beach mouse incidental to construction of up to 500 single-family developments potentially affecting an...
40 CFR 71.27 - Public participation and appeal.
Code of Federal Regulations, 2010 CFR
2010-07-01
... raised at the hearing. All comments shall be considered in making the final decision and shall be... issuance. (j) Response to comments. (1) At the time that any final permit decision is issued, the... written response giving a reason for the decision. Denials of requests for revision, revocation and...
Epidemiology of Late Health Effects in Ukrainian Chornobyl Cleanup Workers.
Bazyka, Dimitry; Prysyazhnyuk, Anatoly; Gudzenko, Natalya; Dyagil, Iryna; Belyi, David; Chumak, Vadim; Buzunov, Volodymyr
2018-07-01
This article summarizes the results of 30 y of follow-up of cancer and noncancer effects in Ukrainian cleanup workers after the Chornobyl accident. The number of power plant employees and first responders with acute radiation syndrome under follow-up by the National Research Center for Radiation Medicine decreased from 179 in 1986-1991 to 105 in 2011-2015. Cancers and leukemia (19) and cardiovascular diseases (21) were the main causes of deaths among acute radiation syndrome survivors (54) during the postaccident period. Increased radiation risks of leukemia in the Ukrainian cohort of 110,645 cleanup workers exposed to low doses are comparable to those among survivors of the atomic bomb explosions in Japan in 1945. Additionally, an excess of chronic lymphocytic leukemia was demonstrated in the cleanup workers cohort for 26 y after the exposure. A significant excess of multiple myeloma incidence [standardized incidence rate (SIR) 1.61 %, 95% confidence interval (CI) 1.01-2.21], thyroid cancer (SIR 4.18, 95% CI 3.76-4.59), female breast cancer (SIR 1.57 CI 1.40-1.73), and all cancers combined (SIR 1.07; 95% CI 1.05-1.09) was registered. High prevalence was demonstrated for cardio- and cerebrovascular diseases and mental health changes. However, the reasons for the increases require further investigation. To monitor other possible late effects of radiation exposure in Chornobyl cleanup workers, analytical cohort and case-control studies need to include cardiovascular pathology, specifically types of potentially radiogenic cancers using a molecular epidemiology approach. Possible effects for further study include increased rates of thyroid, breast, and lung cancers and multiple myeloma; reduction of radiation risks of leukemia to population levels; and increased morbidity and mortality of cleanup workers from cardio- and cerebrovascular pathology.
Chao, Morgan G; Dubé, Anne-Julie; Leone, Cortney M; Moore, Christina M; Fraser, Angela M
2016-11-01
Human noroviruses are the leading cause of foodborne disease in the United States, sickening 19 to 21 million Americans each year. Vomit and diarrhea are both highly concentrated sources of norovirus particles. For this reason, establishing appropriate cleanup procedures for these two substances is critical. Food service establishments in states that have adopted the 2009 or 2013 U.S. Food and Drug Administration Food Code are required to have a program detailing specific cleanup procedures. The aim of our study was to determine the alignment of existing vomit and diarrhea cleanup procedures with the 11 elements recommended in Annex 3 of the 2011 Supplement to the 2009 Food Code and to determine their readability and clarity of presentation. In July 2015, we located vomit and diarrhea cleanup procedures by asking Norovirus Collaborative for Outreach, Research, and Education stakeholders for procedures used by their constituency groups and by conducting a Google Advanced Search of the World Wide Web. We performed content analysis to determine alignment with the recommendations in Annex 3. Readability and clarity of presentation were also assessed. A total of 38 artifacts were analyzed. The mean alignment score was 7.0 ± 1.7 of 11 points; the mean clarity score was 6.7 ± 2.5 of 17 points. Only nine artifacts were classified as high clarity, high alignment. Vomit and diarrhea cleanup procedures should align with Annex 3 in the Food Code and should, as well, be clearly presented; yet, none of the artifacts completely met both conditions. To reduce the spread of norovirus infections in food service establishments, editable guidelines are needed that are aligned with Annex 3 and are clearly written, into which authors could insert their facility-specific information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pierce, Eric M.; Freshley, Mark D.; Hubbard, Susan S.
In this report, we start by examining previous efforts at linking science and DOE EM research with cleanup activities. Many of these efforts were initiated by creating science and technology roadmaps. A recurring feature of successfully implementing these roadmaps into EM applied research efforts and successful cleanup is the focus on integration. Such integration takes many forms, ranging from combining information generated by various scientific disciplines, to providing technical expertise to facilitate successful application of novel technology, to bringing the resources and creativity of many to address the common goal of moving EM cleanup forward. Successful projects identify and focusmore » research efforts on addressing the problems and challenges that are causing “failure” in actual cleanup activities. In this way, basic and applied science resources are used strategically to address the particular unknowns that are barriers to cleanup. The brief descriptions of the Office of Science basic (Environmental Remediation Science Program [ERSP]) and EM’s applied (Groundwater and Soil Remediation Program) research programs in subsurface science provide context to the five “crosscutting” themes that have been developed in this strategic planning effort. To address these challenges and opportunities, a tiered systematic approach is proposed that leverages basic science investments with new applied research investments from the DOE Office of Engineering and Technology within the framework of the identified basic science and applied research crosscutting themes. These themes are evident in the initial portfolio of initiatives in the EM groundwater and soil cleanup multi-year program plan. As stated in a companion document for tank waste processing (Bredt et al. 2008), in addition to achieving its mission, DOE EM is experiencing a fundamental shift in philosophy from driving to closure to enabling the long-term needs of DOE and the nation.« less
15 CFR 904.305 - Final administrative decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Permit Sanctions and Denials General § 904.305 Final administrative decision. (a) If no request...
15 CFR 904.305 - Final administrative decision.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Permit Sanctions and Denials General § 904.305 Final administrative decision. (a) If no request...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1999-03-01
This document presents the selected remedial action for the cleanup of wastes related to Manhattan Engineering District/Atomic Energy Commission (MED/AEC) operations in accessible soils and ground water at the St. Louis Downtown Site (SLDS). The main components of the selected remedial action include: Excavation and off-site disposal of approximately 65,000 cubic meters (85,000 cubic yards) (in-situ) contaminated soil; and No remedial action is required for ground water beneath the site. Perimeter monitoring of the ground water in the Mississippi River alluvial aquifer, designated as the hydrostratigraphic B Unit, will be performed and the need for ground water remediation will bemore » evaluated as part of the periodic reviews performed for the site.« less
15 CFR 904.104 - Final administrative decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Civil Penalties § 904.104 Final administrative decision. (a) If no request for hearing is timely...
15 CFR 904.104 - Final administrative decision.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Civil Penalties § 904.104 Final administrative decision. (a) If no request for hearing is timely...
EPA Handbook on the Benefits, Costs, and Impacts of Land Cleanup and Reuse (2011)
This Handbook describes EPA‘s land cleanup and reuse programs and outlines some of the unique aspects that have complicated efforts to develop suitable methods for estimating benefits. It clarifies the differences between types of economic analyses—specif
Learn about the work of EPA’s Pacific Southwest Underground Storage Tank (UST) program to reduce its environmental footprint by using greener cleanup practices at the Telles Ranch leaking UST site in Arizona.
EPA prepared these Frequently Asked Questions and Answers to assist prospective applicants with preparing Brownfields Assessment, Revolving Loan Fund and Cleanup grant proposals for the FY14 competition. Please review the FY 2014 proposal guidelines/Reques
PHYTOREMEDIATION: USING PLANTS TO CLEAN UP CONTAMINATED SOIL, GROUNDWATER, AND WASTEWATER
Phytoremediation is an emerging cleanup technology for contaminated soils, groundwater, and wastewater that is both low-tech and low-cost. The cleanup technology is defined as the use of green plants to remove, contain, or render harmless such environmental contaminants as heavy ...
33 CFR 137.55 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Searches for recorded environmental cleanup liens. 137.55 Section 137.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL...
33 CFR 137.55 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Searches for recorded environmental cleanup liens. 137.55 Section 137.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL...
33 CFR 137.55 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Searches for recorded environmental cleanup liens. 137.55 Section 137.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL...
33 CFR 137.55 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Searches for recorded environmental cleanup liens. 137.55 Section 137.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL...
33 CFR 137.55 - Searches for recorded environmental cleanup liens.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Searches for recorded environmental cleanup liens. 137.55 Section 137.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL...
40 CFR 761.243 - Standard wipe sample method and size.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., AND USE PROHIBITIONS Determining a PCB Concentration for Purposes of Abandonment or Disposal of Natural Gas Pipeline: Selecting Sample Sites, Collecting Surface Samples, and Analyzing Standard PCB Wipe.../Rinse Cleanup as Recommended by the Environmental Protection Agency PCB Spill Cleanup Policy,” dated...
Fact Sheet on Avoiding Indoor Air Quality Problems During Flood Cleanup
This fact sheet discusses problems caused by microbial growth, and other effects of flooding, on indoor air quality and the steps you can take to lessen these effects. This focuses on residential flood cleanup, but it applies to other building types.
When compared to traditional approaches, the utilization of molecular and genomic techniques to soil and groundwater cleanup investigations can reduce inherent parameter variability when conducting bench and pilot-scale investigations or carrying out full-scale field applications...
Perioperative hair removal: A review of best practice and a practice improvement opportunity.
Spencer, Maureen; Barnden, Marsha; Johnson, Helen Boehm; Fauerbach, Loretta Litz; Graham, Denise; Edmiston, Charles E
2018-06-01
The current practice of perioperative hair removal reflects research-driven changes designed to minimize the risk of surgical wound infection. An aspect of the practice which has received less scrutiny is the clean-up of the clipped hair. This process is critical. The loose fibers represent a potential infection risk because of the micro-organisms they can carry, but their clean-up can pose a logistical problem because of the time required to remove them. Research has demonstrated that the most commonly employed means of clean-up, the use of adhesive tape or sticky mitts, can be both ineffective and time-consuming in addition to posing an infection risk from cross-contamination. Recently published research evaluating surgical clippers fitted with a vacuum-assisted hair collection device highlights the potential for significant practice improvement in the perioperative hair removal clean-up process. These improvements include not only further mitigation of potential infection risk but also substantial OR time and cost savings.
Evaluation of beach cleanup effects using linear system analysis.
Kataoka, Tomoya; Hinata, Hirofumi
2015-02-15
We established a method for evaluating beach cleanup effects (BCEs) based on a linear system analysis, and investigated factors determining BCEs. Here we focus on two BCEs: decreasing the total mass of toxic metals that could leach into a beach from marine plastics and preventing the fragmentation of marine plastics on the beach. Both BCEs depend strongly on the average residence time of marine plastics on the beach (τ(r)) and the period of temporal variability of the input flux of marine plastics (T). Cleanups on the beach where τ(r) is longer than T are more effective than those where τ(r) is shorter than T. In addition, both BCEs are the highest near the time when the remnants of plastics reach the local maximum (peak time). Therefore, it is crucial to understand the following three factors for effective cleanups: the average residence time, the plastic input period and the peak time. Copyright © 2014 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
From 1963 to 1969, two acres of the Harvey and Knott Drum site in New Castle County, Delaware served as an open dump and burning area for sanitary, municipal, and industrial wastes. Sludge, paint pigment, and solvents contaminated the site until the State of Delaware and the US Environmental Protection Agency (EPA) intervened in 1981. Site conditions required a combination of traditional cleanup measures. After the immediate health threats posed by the site were eliminated, EPA reached an innovative, mixed funding settlement for long-term cleanup with two parties responsible for the site contamination. The following actions highlight the success ofmore » the Superfund program: An emergency removal of contaminants reduced immediate environmental and public health effects; A rapid assessment of ground water safeguarded drinking water supplies; and The full cooperation of General Motors (GM) expedited implementation of the cleanup, valued at $3.2 million.« less
Daubert v. Merrell: Opening floodgates of scientific uncertainty?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bibko, P.N.
1994-12-31
At last year`s plenary session on May 27, 1993, Col. John Glass, Deputy Director of the Army`s environmental program, acknowledged public pressure to expedite site restoration. A few days later, Gary Vest, Deputy Assistant Secretary for the Air Force told a Senate committee that clean-up levels should be relaxed depending upon intended land use. Soon after, EPA publicly announced support for relaxed clean-up levels depending upon use after restoration. Ironically, also on May 27, 1993, while EPA and the Department of Defense were considering the stringency of clean-up levels, the Environmental Defense Fund and Physicians for Social Responsibility were warningmore » the White House of the increasing health risks due to environmental contamination. The author emphasizes the need to set clean-up standards at levels that will assure protection of public health, and at the same time minimize the legal liability of those involved with the disposal or storage of hazardous waste.« less
Doses of Ukrainian female clean-up workers with diagnosed breast cancer.
Chumak, Vadim V; Klymenko, Sergiy V; Zitzelsberger, Horst; Wilke, Christina; Rybchenko, Lyudmila A; Bakhanova, Elena V
2018-05-01
The Chernobyl reactor accident in 1986 has caused significant exposure to ionizing radiation of the Ukrainian population, in particular clean-up workers and evacuees from the exclusion zones. A study aiming at the discovery of radiation markers of the breast cancer was conducted from 2008 to 2015 within a collaborative project by HZM, LMU, and NRCRM. In this study, post-Chernobyl breast cancer cases both in radiation-exposed female patients diagnosed at age less than 60 from 1992 to 2014 and in non-exposed controls matched for residency, tumor type, age at diagnosis, TNM classification as well as tumor grading were investigated for molecular changes with special emphasis to copy number alterations and miRNA profiles. Cancer registry and clinical archive data were used to identify 435 breast cancer patients among female clean-up workers and 14 among evacuees from highly contaminated territories as candidates for the study. Of these, 129 breast cancer patients fit study inclusion criteria and were traced for individual reconstruction of the target organ (breast) doses. The doses were estimated for 71 exposed cases (clean-up workers and evacuees from which biomaterial was available for molecular studies and who agreed to participate in a dosimetric interview) by the use of the well-established RADRUE method, which was adjusted specifically for the assessment of breast doses. The results of 58 female clean-up workers showed a large inter-individual variability of doses in a range of about five orders of magnitude: from 0.03 to 929 mGy, with median of 5.8 mGy. The study provides the first quantitative estimate of exposures received by female clean-up workers, which represent a limited but very important group of population affected by the Chernobyl accident. The doses of 13 women evacuated after the accident who did not take part in the clean-up activities (from 4 to 45 mGy with median of 19 mGy) are in line with the previous estimates for the evacuees from Pripyat and the 30-km zone.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henderson, Heidi; Shoffner, Peggy; Lagos, Leonel E.
2012-07-01
The River Corridor Closure Project is the nation's largest environmental cleanup closure project where innovative technologies are being utilized to overcome DOE's environmental clean-up challenges. DOE provides a Technology Needs Statement that specifies their on-site challenges and the criteria to overcome those challenges. This allows for both the private sector and federally funded organizations to respond with solutions that meet their immediate needs. DOE selects the company based on their ability to reduce risk to human health and the environment, improve efficiency of the cleanup, and lower costs. These technologies are our link to a cleaner, safer, healthier tomorrow. (authors)
Evaluation of New Cleanup Agents for Analysis of Pesticide Residues in Tea.
Ueda, Yuko; Honda, Katsuhisa
2017-01-01
We evaluated the effectiveness of new cleanup agents (S-NH 2 and S-Si) compared with other previously reported cleanup agents (octadecylsilane, graphitized carbon, aminopropyl and silica gel) for removal of interfering substances such as catechin and caffeine prior to analysis of pesticide residues in tea. S-NH 2 and S-Si were highly efficient in removal of catechin and caffeine, respectively. Recoveries of 80 pesticides using S-NH 2 and S-Si were tested, and more than 70% of pesticides showed recovery greater than 70%. These results indicate that S-NH 2 and S-Si agents will be useful for analysis of pesticide residues in tea.
42 CFR 456.238 - Time limits for final decision and notification of adverse decision.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Mental Hospitals Ur Plan: Review of Need for Continued Stay § 456.238 Time limits for... 42 Public Health 4 2011-10-01 2011-10-01 false Time limits for final decision and notification of...
EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...
5 CFR 551.708 - Finality and effect of OPM FLSA claim decision.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Finality and effect of OPM FLSA claim decision. 551.708 Section 551.708 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE.... (b) A decision by OPM under the Act is binding on all administrative, certifying, payroll, disbursing...