DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mathews, S.
This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...
RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.
1989-05-01
20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION
Land use-based landscape planning and restoration in mine closure areas.
Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke
2011-05-01
Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.
Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S
2012-11-14
States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.
Knowing Where You're Going: Planning for Meaningful Course Closure
ERIC Educational Resources Information Center
Burgess-Van Aken, Barbara
2017-01-01
A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…
Planning the Transition to Long-Term Stewardship for the River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cearlock, C.S.; Lerch, J.A.; Sands, J.P.
2007-07-01
Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
Ren, Jianan; Yuan, Yujie; Zhao, Yunzhao; Gu, Guosheng; Wang, Gefei; Chen, Jun; Fan, Chaogang; Wang, Xinbo; Li, Jieshou
2014-04-01
The use of open abdomen in the management of gastrointestinal fistula complicated with severe intra-abdominal infection is uncommon. This study was designed to evaluate outcomes of our staged approach for the infected open abdomen. Patients who had gastrointestinal fistula and underwent open abdomen treatment were retrospectively reviewed. Various materials such as polypropylene mesh and a modified sandwich package were used to achieve temporary abdominal closure followed by skin grafting when the granulation bed matured. A delayed definitive operation was performed for final abdominal closure without implant of prosthetic mesh. Between 1999 and 2009, 56 (68.3%) of 82 patients survived through this treatment. Among them, 42 patients achieved final abdominal closure. Spontaneous fistula closure occurred in 16 patients with secondary fistula recorded in six patients. Besides, wound complications occurred in 13 patients with two cases for pulmonary infection. Within a 12-month follow-up period after definitive closure, no additional fistula was recorded excluding planned ventral hernia repair. Open abdomen treatment was effective for gastrointestinal fistula complicated by severe intra-abdominal infection. A delayed and deliberate operative strategy aiming at fistula excision and fascial closure, with simultaneous abdominal wall reconstruction, was required for the infected open abdomen.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... layer, a 24-inch native sand layer, an 18-inch imported silt evapotranspiration layer, and a 6-inch... Quality Assurance & Control Plan'' for the closure project that specifies that testing will be performed... described in detail in the ``Construction Quality Assurance & Control Plan.'' II. EPA's Action A...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Project Integration
2005-09-26
The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
100-D Ponds closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, S.W.
1997-09-01
The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
40 CFR 264.258 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
36 CFR 907.11 - Actions that normally require an environmental assessment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...
36 CFR 907.11 - Actions that normally require an environmental assessment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1997-02-25
1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less
Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.
2012-05-07
This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
PRIGNANO, A.L.
2003-06-25
This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Injection Wells § 146.71 Closure. (a) Closure Plan. The owner or operator of a Class I hazardous waste injection well shall prepare, maintain, and comply with a plan for closure of the well that meets... of material to be used in plugging; (iv) The method of placement of the plugs; (v) Any proposed test...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... effective 12:01 a.m., local time on July 1, 2012, until 12:01 a.m., local time on January 1, 2013. ADDRESSES: Electronic copies of documents supporting the final temporary rule implementing gray triggerfish management... . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf is managed under the Fishery Management Plan for...
2011-01-01
Background School closure was employed as a non-pharmaceutical intervention against pandemic 2009 H1N1, particularly during the first wave. More than 700 schools in the United States were closed. However, closure decisions reflected significant variation in rationales, decision triggers, and authority for closure. This variability presents the opportunity for improved efficiency and decision-making. Methods We identified media reports relating to school closure as a response to 2009 H1N1 by monitoring high-profile sources and searching Lexis-Nexis and Google news alerts, and reviewed reports for key themes. News stories were supplemented by observing conference calls and meetings with health department and school officials, and by discussions with decision-makers and community members. Results There was significant variation in the stated goal of closure decision, including limiting community spread of the virus, protecting particularly vulnerable students, and responding to staff shortages or student absenteeism. Because the goal of closure is relevant to its timing, nature, and duration, unclear rationales for closure can challenge its effectiveness. There was also significant variation in the decision-making authority to close schools in different jurisdictions, which, in some instances, was reflected in open disagreement between school and public health officials. Finally, decision-makers did not appear to expect the level of scientific uncertainty encountered early in the pandemic, and they often expressed significant frustration over changing CDC guidance. Conclusions The use of school closure as a public health response to epidemic disease can be improved by ensuring that officials clarify the goals of closure and tailor closure decisions to those goals. Additionally, authority to close schools should be clarified in advance, and decision-makers should expect to encounter uncertainty disease emergencies unfold and plan accordingly. PMID:21284865
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
Bankson, Daniel D; Heim, Joseph A
2014-01-01
To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
40 CFR 265.142 - Cost estimate for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...
40 CFR 265.142 - Cost estimate for closure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1996-07-31
This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less
Incorporating Conservation Zone Effectiveness for Protecting Biodiversity in Marine Planning
Makino, Azusa; Klein, Carissa J.; Beger, Maria; Jupiter, Stacy D.; Possingham, Hugh P.
2013-01-01
Establishing different types of conservation zones is becoming commonplace. However, spatial prioritization methods that can accommodate multiple zones are poorly understood in theory and application. It is typically assumed that management regulations across zones have differential levels of effectiveness (“zone effectiveness”) for biodiversity protection, but the influence of zone effectiveness on achieving conservation targets has not yet been explored. Here, we consider the zone effectiveness of three zones: permanent closure, partial protection, and open, for planning for the protection of five different marine habitats in the Vatu-i-Ra Seascape, Fiji. We explore the impact of differential zone effectiveness on the location and costs of conservation priorities. We assume that permanent closure zones are fully effective at protecting all habitats, open zones do not contribute towards the conservation targets and partial protection zones lie between these two extremes. We use four different estimates for zone effectiveness and three different estimates for zone cost of the partial protection zone. To enhance the practical utility of the approach, we also explore how much of each traditional fishing ground can remain open for fishing while still achieving conservation targets. Our results show that all of the high priority areas for permanent closure zones would not be a high priority when the zone effectiveness of the partial protection zone is equal to that of permanent closure zones. When differential zone effectiveness and costs are considered, the resulting marine protected area network consequently increases in size, with more area allocated to permanent closure zones to meet conservation targets. By distributing the loss of fishing opportunity equitably among local communities, we find that 84–88% of each traditional fishing ground can be left open while still meeting conservation targets. Finally, we summarize the steps for developing marine zoning that accounts for zone effectiveness. PMID:24223870
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...
DOE Office of Scientific and Technical Information (OSTI.GOV)
SM Narbutovskih
2000-03-31
Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), themore » owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
300 Area waste acid treatment system closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...
40 CFR 264.197 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...
ERIC Educational Resources Information Center
Gross, Rosalind L.; White, Harry E.
This publication describes a selected group of child-resistant closures used in packaging five categories of medicine and household products. The material in the document was collected to train survey personnel to identify closures for a planned household study of the effectiveness of child-resistant packaging. The 39 closures described are of…
43 CFR 3809.401 - Where do I file my plan of operations and what information must I include with it?
Code of Federal Regulations, 2011 CFR
2011-10-01
... would not result in unnecessary or undue degradation of public lands. (b) Your plan of operations must... BLM to determine that the plan of operations prevents unnecessary or undue degradation: (1) Operator... closure (including periods of seasonal closure) to prevent unnecessary or undue degradation. The interim...
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...
40 CFR 264.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...
Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
NASA Astrophysics Data System (ADS)
Shi, Jing Xian; Ran, Zhi Hong
2018-06-01
During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.
40 CFR 258.72 - Financial assurance for post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used...
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
2006-09-01
This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
No-migration variance petition. Appendices C--J: Volume 5, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-03-01
Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... Grant Assurance Obligations Due to Airport Layout Plan Revision at Mather Airport, Sacramento, CA AGENCY... Mather Airport, Sacramento, California, which will provide for a release from the Grant Agreement... the closure of Mather Air Force Base pursuant to the Defense Base Closure and Realignment Act of 1988...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuor, N. R.; Schubert, A. L.
2002-02-26
Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less
The use of a silicon sheet for gradual wound closure after fasciotomy.
Walker, Tobias; Gruler, Miriam; Ziemer, Gerhard; Bail, Dorothee H L
2012-06-01
We present a silicon sheet for temporary wound covering and gradual wound closure after open fasciotomy. Fasciotomy was performed in a total of 70 limbs with compartment syndrome (CS). The main etiology of CS was predominantly vascular. All patients were treated with a silicon sheet to cover the soft tissue defect and gradually reapproximate the skin margins. In 53% of the patients, a delayed final wound closure was achieved after a mean of 11.9 days. This method allows final closure of fasciotomy wounds without scar contractures, marginal necrosis, infection, or significant pain. Copyright © 2012 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strachan, C.L.; Raabe, K.L.
1997-12-31
In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
40 CFR 264.113 - Closure; time allowed for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
....113 Section 264.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... the final volume of hazardous wastes, or the final volume of non-hazardous wastes if the owner or...
2006-07-01
the Army Health Facility Planning Agency (HFPA). F HFPA Bl s B CCSIMakhldr PA& E ecision MECOM anpowe Support GPRMS SuthWest egion - IM CTRI WEIST (DcI 4...providers or resources. Finally, is there potential for consolidation of staff support areas such as lounges , locker rooms or conference areas (DoD Medical...Organization and Equipment for the ist AD (see appendix I). Utilizing this identified structure, the Army Force Management Support Agency web portal
Case Closure Procedures for Foreign Military Sales
1990-04-05
This is our final report on the Audit of Case Closure Procedures for Foreign Military Sales for your information and use. Comments on a draft of this...report were considered in preparing the final report. We made the audit from January through August 1989. The objectives of the audit were to
Development of Infrared Phase Closure Capability in the Infrared-Optical Telescope Array (IOTA)
NASA Technical Reports Server (NTRS)
Traub, Wesley A.
2002-01-01
We completed all major fabrication and testing for the third telescope and phase-closure operation at the Infrared-Optical Telescope Array (IOTA) during this period. In particular we successfully tested the phase-closure operation, using a laboratory light source illuminating the full delay-line optical paths, and using an integrated-optic beam combiner coupled to our Picnic-detector camera. This demonstration is an important and near-final milestone achievement. As of this writing, however, several tasks yet remain, owing to development snags and weather, so the final proof of success, phase-closure observation of a star, is now expected to occur in early 2002, soon after this report has been submitted.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... that the waste in the FTF: (1) Does not require permanent isolation in a deep geologic repository for... pursuant to a State approved closure plan or State-issued permit; or (3)(B) exceeds concentration limits... 10 CFR part 61, Subpart C; pursuant to a State-approved closure plan or State-issued [[Page 20376...
Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bamberger, Judith A; Burks, Barry L; Quigley, Keith D
2001-09-28
The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less
School Closings in Philadelphia
ERIC Educational Resources Information Center
Jack, James; Sludden, John
2013-01-01
In 2012, the School District of Philadelphia closed six schools. In 2013, it closed 24. The closure of 30 schools has occurred amid a financial crisis, headlined by the district's $1.35 billion deficit. School closures are one piece of the district's plan to cut expenditures and close its budget gap. The closures are also intended to make…
ERIC Educational Resources Information Center
Tsai, Victoria; Khan, Nomana M.; Shi, Jianrong; Rainey, Jeanette; Gao, Hongjiang; Zheteyeva, Yenlik
2017-01-01
Background: School closure is one of the primary measures considered during severe influenza pandemics and other emergencies. However, prolonged school closures may cause unintended adverse consequences to schools, students, and their families. A better understanding of these consequences will inform prepandemic planning, and help public health…
2005 Base Closure and Realignment Commission Report
The 2005 Defense Base Closure and Realignment Commission is proud to present its Final Report for your consideration. As required by law, the Commission thoroughly and objectively reviewed the domestic installation closure and realignment recommendations proposed by the Secretary of Defense on May 13, 2005.
Vetter, Diana; Raptis, Dimitri Aristotle; Giama, Mira; Hosa, Hanna; Muller, Markus K; Nocito, Antonio; Schiesser, Marc; Moos, Rudolf; Bueter, Marco
2017-12-01
The aims of the present study were to assess whether planned secondary wound closure at the insertion site of the circular stapler reduces wound infection rate and postoperative morbidity after laparoscopic Roux-en-Y gastric bypass (RYGB) and to identify independent predictive factors increasing the risk for wound infections after RYGB. This paper is a retrospective single-center analysis of a prospectively collected database of 1400 patients undergoing RYGB surgery in circular technique between June 2000 and June 2016. Planned secondary wound closure at the circular stapler introduction site was performed at postoperative day 3 in 291 (20.8%) consecutive patients and compared to a historical control of 1109 (79.2%) consecutive patients with primary wound closure. Independent predictive factors for wound infection were assessed by multivariable analysis. Secondary wound closure significantly decreased wound infection rate from 9.3% (103/1109) to 1% (3/291) (p < 0.001) leading to a shorter hospital stay (mean 9 (SD8) vs. 7 days (SD2), p < 0.001), lower costs (p = 0.039), and reduced postoperative morbidity (mean 90-day Comprehensive Complication Index (CCI) 7.4 (SD14.0) vs. 5.1 (SD11.1) p = 0.008) when compared to primary wound closure. Primary wound closure, dyslipidemia, and preoperative gastritis were independent predictive risk factors for developing wound infections both in the univariate (p < 0.001; p = 0.048; p = 0.003) and multivariable analysis (p < 0.001; p = 0.040; p = 0.012). Further, on multivariable analysis, the female gender was a predictive factor (p = 0.034) for wound infection development. Secondary wound closure at the circular stapler introduction site in laparoscopic RYGB significantly reduces the overall wound infection rate as well as postoperative morbidity, costs, and hospital stay when compared to primary wound closure.
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
Feasibility of lane closures using probe data.
DOT National Transportation Integrated Search
2017-04-01
To develop an adequate traffic operations management and congestion mitigation plan for every roadway : maintenance and construction project requiring lane closures, transportation agencies need accurate and : reliable estimates of traffic impacts as...
A novel method for trajectory planning of cooperative mobile manipulators.
Bolandi, Hossein; Ehyaei, Amir Farhad
2011-01-01
We have designed a two-stage scheme to consider the trajectory planning problem of two mobile manipulators for cooperative transportation of a rigid body in the presence of static obstacles. In the first stage, with regard to the static obstacles, we develop a method that searches the workspace for the shortest possible path between the start and goal configurations, by constructing a graph on a portion of the configuration space that satisfies the collision and closure constraints. The final stage is to calculate a sequence of time-optimal trajectories to go between the consecutive points of the path, with regard to the nonholonomic constraints and the maximum allowed joint accelerations. This approach allows geometric constraints such as joint limits and closed-chain constraints, along with differential constraints such as nonholonomic velocity constraints and acceleration limits, to be incorporated into the planning scheme. The simulation results illustrate the effectiveness of the proposed method.
A Novel Method for Trajectory Planning of Cooperative Mobile Manipulators
Bolandi, Hossein; Ehyaei, Amir Farhad
2011-01-01
We have designed a two-stage scheme to consider the trajectory planning problem of two mobile manipulators for cooperative transportation of a rigid body in the presence of static obstacles. In the first stage, with regard to the static obstacles, we develop a method that searches the workspace for the shortest possible path between the start and goal configurations, by constructing a graph on a portion of the configuration space that satisfies the collision and closure constraints. The final stage is to calculate a sequence of time-optimal trajectories to go between the consecutive points of the path, with regard to the nonholonomic constraints and the maximum allowed joint accelerations. This approach allows geometric constraints such as joint limits and closed-chain constraints, along with differential constraints such as nonholonomic velocity constraints and acceleration limits, to be incorporated into the planning scheme. The simulation results illustrate the effectiveness of the proposed method. PMID:22606656
77 FR 67023 - Notice of Temporary Closure on Public Lands in Mesa County, CO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-08
... soils in place. A temporary closure of public land to vehicle and foot traffic within the burned area is... germinating, hybrid annual seed and plans to disperse native species seeds in the affected area. The dispersed... Pine Ridge Fire Temporary Closure Area by any means of transportation, including by vehicle or foot...
Thinning guidelines from crown area relationships for young hardwood plantations
Jeffrey W. Stringer; Luke Cecil
2010-01-01
Crown closure in hardwood plantations signals the first opportunity to apply density control treatments such as thinning or release. The proper timing of these treatments is a function of stocking levels and is generally scheduled within several years after initial crown closure. Predicting crown closure for a plantation provides practitioners with the ability to plan...
Communicating Performance Assessments Results - 13609
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark
2013-07-01
The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to bemore » used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)« less
40 CFR 265.143 - Financial assurance for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., except as provided in § 265.143(f), divided by the number of years in the pay-in period. (ii) Subsequent... bills for partial or final closure activities, the Regional Administrator will instruct the trustee to... facility over its remaining operating life. Within 60 days after receiving bills for closure activities...
40 CFR 264.143 - Financial assurance for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... in § 264.143(g), divided by the number of years in the pay-in period. Subsequent payments must be... for partial or final closure activities, the Regional Administrator will instruct the trustee to make... operating life. Within 60 days after receiving bills for closure activities, the Regional Administrator will...
Williams, S. Jeffress; Foley, Mary K.
2007-01-01
4. Economic costs and benefits of artificial closure. This report for breach management presents protocols which specify when breach closures within the FIIS might be desirable and necessary, as well as provides recommendations for structural breach closure engineering operations which are indented to minimize negative impacts to the natural wilderness values and cultural resources within the FIIS, particularly the Otis Pike Wilderness Area. The goal of the plan is to strike a balance between protecting natural resources and allowing natural processes to operate and avoiding loss of life and excessive property damage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less
Household responses to school closure resulting from outbreak of influenza B, North Carolina.
Johnson, April J; Moore, Zack S; Edelson, Paul J; Kinnane, Lynda; Davies, Megan; Shay, David K; Balish, Amanda; McCarron, Meg; Blanton, Lenee; Finelli, Lyn; Averhoff, Francisco; Bresee, Joseph; Engel, Jeffrey; Fiore, Anthony
2008-07-01
School closure is a proposed strategy for reducing influenza transmission during a pandemic. Few studies have assessed how families respond to closures, or whether other interactions during closure could reduce this strategy's effect. Questionnaires were administered to 220 households (438 adults and 355 children) with school-age children in a North Carolina county during an influenza B virus outbreak that resulted in school closure. Closure was considered appropriate by 201 (91%) households. No adults missed work to solely provide childcare, and only 22 (10%) households required special childcare arrangements; 2 households incurred additional costs. Eighty-nine percent of children visited at least 1 public location during the closure despite county recommendations to avoid large gatherings. Although behavior and attitudes might differ during a pandemic, these results suggest short-term closure did not cause substantial hardship for parents. Pandemic planning guidance should address the potential for transmission in public areas during school closure.
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.; Lantow, Tiffany A.
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less
DeFazio, Michael V; Economides, James M; Anghel, Ersilia L; Mathis, Ryan K; Barbour, John R; Attinger, Christopher E
2017-10-01
Loss of domain often complicates attempts at delayed wound closure in regions of high tension. Wound temporization with traction-assisted internal negative pressure wound therapy (NPWT), using bridging retention sutures, can minimize the effects of edema and elastic recoil that contribute to progressive tissue retraction over time. The investigators evaluated the safety and efficacy of this technique for complex wound closure. Between May 2015 and November 2015, 18 consecutive patients underwent staged reconstruction of complex and/or contaminated soft tissue defects utilizing either conventional NPWT or modified NPWT with instillation and continuous dermatotraction via bridging retention sutures. Instillation of antimicrobial solution was reserved for wounds containing infected/exposed hardware or prosthetic devices. Demographic data, wound characteristics, reconstructive outcomes, and complications were reviewed retrospectively. Eighteen wounds were treated with traction-assisted internal NPWT using the conventional (n = 11) or modified instillation (n = 7) technique. Defects involved the lower extremity (n = 14), trunk (n = 3), and proximal upper extremity (n = 1), with positive cultures identified in 12 wounds (67%). Therapy continued for 3 to 8 days (mean, 4.3 days), resulting in an average wound surface area reduction of 78% (149 cm² vs. 33 cm²) at definitive closure. Seventeen wounds (94%) were closed directly, whereas the remaining defect required coverage with a local muscle flap and skin graft. At final follow-up (mean, 12 months), 89% of wounds remained closed. In 2 patients with delayed, recurrent periprosthetic infection (mean, 7.5 weeks), serial debridement/hardware removal mandated free tissue transfer for composite defect reconstruction. Traction-assisted internal NPWT provides a safe and effective alternative to reduce wound burden and facilitate definitive closure in cases where delayed reconstruction of high-tension wounds is planned.
300 Area process trench sediment analysis report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zimmerman, M.G.; Kossik, C.D.
1987-12-01
This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less
Overload retardation due to plasticity-induced crack closure
NASA Technical Reports Server (NTRS)
Fleck, N. A.; Shercliff, H. R.
1989-01-01
Experiments are reported which show that plasticity-induced crack closure can account for crack growth retardation following an overload. The finite element method is used to provide evidence which supports the experimental observations of crack closure. Finally, a simple model is presented which predicts with limited success the retardation transient following an overload.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-11
...On November 26, 2012, NMFS published a proposed rule for Amendment 5 to the 2006 Consolidated Highly Migratory Species (HMS) Fishery Management Plan (FMP) in response to several shark stock assessments that were completed from 2009 to 2012. As described in the proposed rule, NMFS is proposing measures that would reduce fishing mortality and effort in order to rebuild overfished Atlantic shark species while ensuring that a limited sustainable shark fishery can be maintained consistent with our legal obligations. The proposed measures include changes to commercial quotas and species groups, the creation of several time/area closures, a change to an existing time/area closure, an increase in the recreational minimum size restrictions, and the establishment of recreational reporting for certain species of sharks. Comments received by NMFS will be considered in the development and finalization of Amendment 5 to the 2006 Consolidated HMS FMP. This notice announces public hearings, conference calls, and an HMS Advisory Panel meeting to discuss the proposed rule.
Strain-energy release rate analysis of a laminate with a postbuckled delamination
NASA Technical Reports Server (NTRS)
Whitcomb, John D.; Shivakumar, K. N.
1987-01-01
The objectives are to present the derivation of the new virtual crack closure technique, evaluate the accuracy of the technique, and finally to present the results of a limited parametric study of laminates with a postbuckled delamination. Although the new virtual crack closure technique is general, only homogeneous, isotropic laminates were analyzed. This was to eliminate the variation of flexural stiffness with orientation, which occurs even for quasi-isotropic laminates. This made it easier to identify the effect of geometrical parameters on G. The new virtual crack closure technique is derived. Then the specimen configurations are described. Next, the stress analyses is discussed. Finally, the virtual crack closure technique is evaluated and then used to calculate the distribution of G along the delamination front of several laminates with a postbuckled delamination.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-04
... Council (Council). This final rule establishes a closure date for the 2013 recreational sector for the... February 21, 2013, NMFS published a proposed rule for the framework action and requested public comments.... This final rule: (1) Establishes a closure date for the recreational sector for the harvest of gag...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
2015-03-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less
3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
Development of Improved Seals and Closures for Dry Diving Suits.
1979-01-31
7 AA SIS 17 2 BATTELLE COL4 4 St LABS 0O 4 F/6 6/17DEVLOPMENT OF IMPROVED SEALS AND CLOSURES FOR DRY DIVAlM SUITS--ETC (U) ULS JAN 79 M61331-76-C...A I Columbus Laboratories Report DTI ELIT V~ omn mbIIap" pww =dt 0lu FINAL REPORT on DEVELOPMENT OF IMPROVED SEALS AND CLOSURES FOR DRY DIVING SUITS...6 Multiple Lip Wrist Seal ..................................... 6 Closures
40 CFR 264.142 - Cost estimate for closure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the cost of final closure at the point in the facility's active life when the extent and manner of its... costs for on-site disposal if he can demonstrate that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure cost estimate may not incorporate any salvage value that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed... from eroding or otherwise damaging the final cover; and (5) Protect and maintain surveyed benchmarks...
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed... from eroding or otherwise damaging the final cover; and (5) Protect and maintain surveyed benchmarks...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
Integrated capabilities in heavy vehicles : human factors research needs
DOT National Transportation Integrated Search
2003-10-09
The Full Road Closure method uses facility closure and total traffic diversion, which may be for one direction or bi-directional traffic flow, to accelerate construction and reduce the negative impacts of work zones. With good planning, interagency c...
1992-04-10
Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year
40 CFR 265.113 - Closure; time allowed for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...
Report to Congress on a Compliance Plan for the Underground Storage Tank Program
Learn about identification of USTs that are not in compliance with Subtitle I of the Solid Waste Disposal Act or are in temporary closure, and determine the ownership of USTs not in compliance or in temporary closure
Feasibility of lane closures using probe data : technical brief.
DOT National Transportation Integrated Search
2017-04-01
This study developed an on-line system analysis tool called the Work Zone Interactive : Management Application - Planning (WIMAP-P), an easy-to-use and easy-to-learn tool for : predicting the traffic impact caused by work zone lane closures on freewa...
Curry, Wayne; Conway, Samuel; Goodfield, Clara; Miller, Kimberly; Mueller, Ronald L; Polini, Eugene
2010-12-01
The preparation of sterile parenteral products requires careful control of all ingredients, materials, and processes to ensure the final product has the identity and strength, and meets the quality and purity characteristics that it purports to possess. Contamination affecting these critical properties of parenteral products can occur in many ways and from many sources. The use of closures supplied by manufacturers in a ready-to-use state can be an effective method for reducing the risk of contamination and improving the quality of the drug product. This article will address contamination attributable to elastomeric container closure components and the regulatory requirements associated with container closure systems. Possible contaminants, including microorganisms, endotoxins, and chemicals, along with the methods by which these contaminants can enter the product will be reviewed. Such methods include inappropriate material selection, improper closure preparation processes, compromised container closure integrity, degradation of closures, and leaching of compounds from the closures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
Final closure of a low level waste disposal facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Potier, J.M.
1995-12-31
The low-level radioactive waste disposal facility operated by the Agence Nationale pour la Gestion des Dechets Radioactifs near La Hague, France was opened in 1969 and is scheduled for final closure in 1996. The last waste package was received in June 1994. The total volume of disposed waste is approximately 525,000 m{sup 3}. The site closure consists of covering the disposal structures with a multi-layer impervious cap system to prevent rainwater from infiltrating the waste isolation system. A monitoring system has been set up to verify the compliance of infiltration rates with hydraulic performance objectives (less than 10 liters permore » square meter and per year).« less
BSA Delta Qualification 2, volume 3, book 1
NASA Technical Reports Server (NTRS)
1994-01-01
This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-02-21
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less
Development of uniform standards for allowable lane closure : final report, September 2008.
DOT National Transportation Integrated Search
2008-09-01
Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2006-09-01
In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less
4-inch sample recovery canisters, Test Model D series. Final report, September 1969--May 1970
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goode, P.L.; Neff, G.W.
1970-12-31
Six tests were conducted on 4-Inch Test Model D Closures to develop an improved closure for the redesigned Sandia Recovery Canister (SRC). The first three closures tested used variations of the high explosive (HE) design used on the previous Model B (Second) Series (P64283). The last three units tested used variations of the HE design used in the Midi Mist Event SRC.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-03
...On November 26, 2012, NMFS published a proposed rule for Amendment 5 to the 2006 Consolidated Highly Migratory Species (HMS) Fishery Management Plan (FMP) in response to several shark stock assessments that were completed from 2009 to 2012. As described in the proposed rule, NMFS is proposing measures that would reduce fishing mortality and effort in order to rebuild overfished Atlantic shark species while ensuring that a limited sustainable shark fishery can be maintained consistent with our legal obligations and the 2006 Consolidated HMS FMP as amended. The proposed measures include changes to commercial quotas and species groups, the creation of several time/ area closures, a change to an existing time/area closure, an increase in the recreational minimum size restrictions, and the establishment of recreational reporting for certain species of sharks. Comments received by NMFS will be considered in the development and finalization of Amendment 5 to the 2006 Consolidated HMS FMP. This notice announces the rescheduling of the Louisiana public hearing and the addition of two public hearings in Maryland and Texas.
Pressure-tight closure for thermoelements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1937-06-14
The thermoelements were arranged in a pressure-tight housing for measuring temperatures on the inside of high-pressure hydrogenation equipment. Should the housing ever leak due to failure of the material or the grinding action of the high sand content of the coal paste, the stall was liable to be set on fire. If, in an installation protected in this manner, an element housing should leak, the pressure tight closure at one end of the housing prevented an escape of the gas and product and the stall could continue to run without danger. The final form of this closure was discussed inmore » detail in this report. In the development of this closure, particular value was attached to a compact construction. In the sealing for a 30-mm high pressure tube, four steel and four constantan wires were insulated and arranged pressure-tight. Each of the three fillers had a different purpose. The hard-rubber insert took the surface pressure, the rubber stopper provided a seal and the cast gypsum provided protection against heat should hot gas or product reach the closure in case of a leaky housing. Two drawings were given showing the thermoelement-closure, and the final form of the closure. The report discussed methods of evacuating from the thermohousings any accumulations of condensed water, which could damage insulation, or hydrogen, which continually diffused in small amounts during operation and which could attack the iron elements of the thermocouples. The pressure-tight closures for thermoelements had been successful at preventing fires due to leakage for more than nine months of operation. 2 sketches.« less
A comparison of three algebraic stress closures for combustor flow calculations
NASA Technical Reports Server (NTRS)
Nikjooy, M.; So, R. M. C.; Hwang, B. C.
1985-01-01
A comparison is made of the performance of two locally nonequilibrium and one equilibrium algebraic stress closures in calculating combustor flows. Effects of four different pressure-strain models on these closure models are also analyzed. The results show that the pressure-strain models have a much greater influence on the calculated mean velocity and turbulence field than the algebraic stress closures, and that the best mean strain model for the pressure-strain terms is that proposed by Launder, Reece and Rodi (1975). However, the equilibrium algebraic stress closure with the Rotta return-to-isotropy model (1951) for the pressure-strain terms gives as good a correlation with measurements as when the Launder et al. mean strain model is included in the pressure-strain model. Finally, comparison of the calculations with the standard k-epsilon closure results show that the algebraic stress closures are better suited for simple turbulent flow calculations.
Development of high integrity, maximum durability concrete structures for LLW disposal facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, W.P.
1992-05-01
A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less
Development of high integrity, maximum durability concrete structures for LLW disposal facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, W.P.
1992-01-01
A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Role of macular hole angle in macular hole closure.
Chhablani, Jay; Khodani, Mitali; Hussein, Abdullah; Bondalapati, Sailaja; Rao, Harsha B; Narayanan, Raja; Sudhalkar, Aditya
2015-12-01
To evaluate correlation of various spectral-domain optical coherence tomography (SD-OCT) parameters including macular hole angle as well as various indices with anatomical and visual outcomes after idiopathic macular hole repair surgery. Retrospective study of 137 eyes of 137 patients who underwent idiopathic macular hole repair surgery between January 2008 and January 2014 was performed. Various qualitative parameters such as presence of vitreomacular traction, epiretinal membrane and cystic edges at the macular hole as well as quantitative parameters such as maximum diameter on the apex of the hole, minimum diameter between edges, nasal and temporal vertical height, longest base diameter and macular hole angle between the retinal edge and the retinal pigment epithelium were noted. Indices including hole form factor, Macular Hole Index (MHI), Diameter Hole Index and Tractional Hole Index (THI) were calculated. Univariate and multivariate regression analysis was performed separately for final visual acuity (VA) and type of closure as dependent variable in relation to SD-OCT parameters as independent variables. On multivariate regression only minimum diameter between edges (p≤0.01) and longest base diameter (p≤0.03) were correlated significantly with both, type 1 closure and final VA. Among the indices, significant correlation of MHI (p=0.009) was noted with type of closure and that of THI with final VA (p=0.017). Our study shows no significant correlation between macular hole angle and hole closure. Minimum diameter between the edges and longest diameter of the hole are best predictors of hole closure and postoperative VA. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
Closedure - Mine Closure Technologies Resource
NASA Astrophysics Data System (ADS)
Kauppila, Päivi; Kauppila, Tommi; Pasanen, Antti; Backnäs, Soile; Liisa Räisänen, Marja; Turunen, Kaisa; Karlsson, Teemu; Solismaa, Lauri; Hentinen, Kimmo
2015-04-01
Closure of mining operations is an essential part of the development of eco-efficient mining and the Green Mining concept in Finland to reduce the environmental footprint of mining. Closedure is a 2-year joint research project between Geological Survey of Finland and Technical Research Centre of Finland that aims at developing accessible tools and resources for planning, executing and monitoring mine closure. The main outcome of the Closedure project is an updatable wiki technology-based internet platform (http://mineclosure.gtk.fi) in which comprehensive guidance on the mine closure is provided and main methods and technologies related to mine closure are evaluated. Closedure also provides new data on the key issues of mine closure, such as performance of passive water treatment in Finland, applicability of test methods for evaluating cover structures for mining wastes, prediction of water effluents from mine wastes, and isotopic and geophysical methods to recognize contaminant transport paths in crystalline bedrock.
Low cracking concretes for the closure pours and overlays of the Dunlap Creek Bridge : final report.
DOT National Transportation Integrated Search
2017-10-01
Joints, wide cracks, and poor-quality concretes facilitate the intrusion of chlorides, causing corrosion in bridge decks and substructures. In this study, joints were replaced with closure pours (link slabs) consisting of low permeability fiber-reinf...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... Microsoft Word, Microsoft Excel, WordPerfect, or Adobe PDF file formats only. FOR FURTHER INFORMATION...). The closure was implemented based on advice from the U.S. Food and Drug Administration (FDA) after... Management Plan (FMP). Since the implementation of the closure, NOAA's National Ocean Service has provided...
Engineering study for closure of 209E facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brevick, C.H.; Heys, W.H.; Johnson, E.D.
1997-07-07
This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mattlin, E.; Charboneau, S.; Johnston, G.
2007-07-01
The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less
Troughs on Martian Ice Sheets: Analysis of Their Closure and Mass Balance
NASA Technical Reports Server (NTRS)
Fountain, A.; Kargel, J.; Lewis, K.; MacAyeal, D.; Pfeffer, T.; Zwally, J.
2000-01-01
At the Copenhagen workshop on Martian polar processes, Ralf Greve commented that the flow regime surrounding scarps and troughs of the Martian polar ice sheets cannot be modeled using traditional "plan view" ice-sheet models. Such models are inadequate because they typically use reduced equations that embody certain simplifications applicable only to terrestrial ice sheets where the upper ice sheet surface is smooth. In response to this suggestion, we have constructed a 2-dimensional, time dependent "side view" (two spatial dimensions: one horizontal, one vertical) model of scarp closure that is designed to overcome the difficulties described by Greve. The purpose of the model is to evaluate the scales of stress variation and styles of flow closure so as to estimate errors that may be encountered by "plan view" models. We show that there may be avenues whereby the complications associated with scarp closure can be overcome in "plan view" models through appropriate parameterizations of 3-dimensional effects. Following this, we apply the flow model to simulate the evolution of a typical scarp on the North Polar Cap of Mars. Our simulations investigate: (a) the role of "radiation trapping" (see our companion abstract) in creating and maintaining "spiral-like" scarps on the ice sheet, (b) the consequences of different flowlaws and ice compositions on scarp evolution and, in particular, scarp age, and (c) the role of dust and debris in scarp evolution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
DOT National Transportation Integrated Search
2017-01-01
Connections, closure pours, and joints in bridges are often sources of distress because of cracks and openings. Wide separation facilitates the penetration of harmful solutions that can lead to costly repairs. Cracks are caused by volumetric changes ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robb, A.J. III; Hoggatt, P.R.
Hydrocarbon containing soil was bioremediated at a combination wastewater and slop oil skim evaporation pond utilizing cost effective low technology resources. Fluids and sludge from the football field-sized pond were extraction procedure toxicity and purgeable organics tested, and total petroleum hydrocarbon (TPH) concentrations determined. An impact risk analysis was performed, and a corrective action plan developed and implemented. The three year project was closely coordinated with the Kansas Corporation Commission (KCC) and the Kansas Department of Health and Environment (KDHE) who established the closure level. The impacted soils at the pond were completely excavated and closure was immediately granted bymore » KDHE for the excavated area. The 24,000 cubic yards of excavated soil were then surface spread on adjacent Mobil property. A nutrient and microbial base was applied to bioaugment the soil. The preapplication land surface and the subsequently land farmed soil was periodically disced and chiseled. A job safety plan including industrial hygiene measures to eliminate workforce exposure was developed and implemented. The final remediation cost analysis amounts to $1.48 per cubic yard compared to the $30 to $150 per cubic yard industry o estimates for similar projects. Several factors were critical in ailing costs to remain so low: (1) assessment and implementation by local in-house staff, (2) conservative remedial action plan and sampling strategy; (3) local contractors; (4) locally available soil amendment; and (5) effective regulatory coordination. The methods described can be used to cost effectively characterize and bioremediate other sites where hydrocarbon-impacted soils exist in similar dry-land environments.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
75 FR 5375 - Hazardous Material; Miscellaneous Packaging Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-02
...In this final rule, PHMSA is amending packaging requirements in the Hazardous Materials Regulations to enhance compliance flexibility, improve clarity, and reduce regulatory burdens. Specifically, we are revising several packaging related definitions; adding provisions to allow more flexibility when preparing and transmitting closure instructions, including conditions under which closure instructions may be transmitted electronically; adding a requirement for shippers to retain packaging closure instructions; incorporating new language that will allow for a practicable means of stenciling the ``UN'' symbol on packagings; and clarifying a requirement to document the methodology used when determining whether a change in packaging configuration requires retesting as a new design or may be considered a variation of a previously tested design. This final rule also incorporates requirements for construction, maintenance, and use of Large Packagings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Emergency Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent...
Sustainable gold mining management waste policy in Romania
NASA Astrophysics Data System (ADS)
Tudor, Elena; Filipciuc, Constantina
2016-04-01
Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands. According to the World Commission on Environment and Development definition, sustainable development is the type of development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Romania has the largest gold reserves in Europe (760 million tons of gold-silver ores, of which 40 million tons in 68 gold deposits in the Apuseni Mountains. New mining projects draw particular attention regarding the environmental risks they cause. Rehabilitation is an ongoing consideration throughout the mine's lifecycle, both from a technical and a financial standpoint. The costs of land rehabilitation are classified as the mine's operating costs. According to Directive 2004/35/EC on environmental liability, the prevention and remedying of environmental damage should be implemented by applying the "polluter pays" principle, in line with the principle of sustainable development. Directive on the management of waste from extractive industries and amending Directive obliges operators to provide (and periodically adjust in size) a financial guarantee for waste facility maintenance and post-closure site restoration, including land rehabilitation. According to the Romanian Mining Law, the license holder has the following obligations related to land use and protection: to provide environmental agreements as one of the prerequisites for a building permit; to regularly update the mine closure plan; to set up and maintain the financial guarantee for environmental rehabilitation; and to execute and finalize the environmental rehabilitation of affected land in the mining site, according to the mine closure plan, including the post-closure monitoring program implementation and financing. Apart from the Mining Law, the Government Decision, which transposes EU Directive on the management of waste from extractive industries, as well as Government Emergency Ordinance, which implements the requirements of EU Directive 2004/35/CE on environmental liability, requests financial guarantees for waste facilities maintenance and for environment restoration in the case of pollution, respectively. In practice, there are problems in the calculation of the financial guarantee and the development of financial security instruments and markets as required by Directive, due to the lack of expertise in financial, economic and liability matters. Mining companies are usually not required to set up a special guarantee for the waste facilities, but only to set up and maintain the financial guarantee regulated under the Mining Law. Romania - because of the structure of its mining sector - has serious environmental legacies, a lack of funds for their restoration and the need to strengthen the administrative capacity in this area, as well as the important tasks on harmonization and/or implementation of the EU mining waste legislation. This work is presented within the framework of SUSMIN project. Key words : sustainable development, waste management, policy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark H.
2012-07-01
The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA providesmore » the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)« less
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2014 CFR
2014-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2012 CFR
2012-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2013 CFR
2013-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
Effects of the internal friction and the solvent quality on the dynamics of a polymer chain closure.
Yu, Wancheng; Luo, Kaifu
2015-03-28
Using 3D Langevin dynamics simulations, we investigate the effects of the internal friction and the solvent quality on the dynamics of a polymer chain closure. We show that the chain closure in good solvents is a purely diffusive process. By extrapolation to zero solvent viscosity, we find that the internal friction of a chain plays a non-ignorable role in the dynamics of the chain closure. When the solvent quality changes from good to poor, the mean closure time τc decreases by about 1 order of magnitude for the chain length 20 ≤ N ≤ 100. Furthermore, τc has a minimum as a function of the solvent quality. With increasing the chain length N, the minimum of τc occurs at a better solvent. Finally, the single exponential distributions of the closure time in poor solvents suggest that the negative excluded volume of segments does not alter the nearly Poisson statistical characteristics of the process of the chain closure.
Planning and Teaching To Remember.
ERIC Educational Resources Information Center
Davies, Nigel R.
2001-01-01
Suggests simple planning and instructional strategies to improve student learning and understanding for present and long -term application. The first section discusses learner-related issues. The second section focuses on the lesson plan (the introduction, the lesson body, and the lesson closure). The third section examines other strategies for…
Risk Assessment Approach for the Hanford Site River Corridor Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomson, J.E.; Weiss, S.G.; Sands, J.P.
2007-07-01
The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less
1993-05-25
OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE BASE CLOSURE AND REALIGNMENT BUDGET DATA FOR FISCAL YEARS 1992 AND 1993...ASSISTANT SECRETARY OF DEFENSE (INSTALLATIONS) SUBJECT: Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for Fiscal Years...1992 and 1993 (Report No. 93-100) We are providing this final summary report for your information and use. The audit was required by Public Law
1994-02-14
Jl%«~~ /&■ OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE BASE CLOSURE AND REALIGNMENT BUDGET DATA FOR FYS 1993 AND...COMPTROLLER) AUDITOR GENERAL, DEPARTMENT OF THE ARMY SUBJECT: Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for FYs...Therefore, we are publishing this report in final form. We appreciate the courtesies and cooperation extended to the audit staff. If you have any
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROMINE, L.D.
2006-02-01
A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less
Manukovsky, N S; Kovalev, V S; Somova, L A; Gurevich, Yu L; Sadovsky, M G
2005-01-01
Bioregenerative life support systems (BLSS) with different coefficients of closure are considered. The 66.2% coefficient of closure achieved in "BIOS-3" facility experiments has been taken as a base value. The increase in coefficient of closure up to 72.6-93.0% is planned due to use of soil-like substrate (SLS) and concentrating of urine. Food values were estimated both in a base variant ("BIOS-3"), and with increases in the coefficient of closure. It is shown that food requirements will be more fully satisfied by internal crop production with an increase in the coefficient of closure of the BLSS. Changes of massflow rates on an 'input-output' and inside BLSS are considered. Equations of synthesis and degradation of organic substances in BLSS were examined using a stoichiometric model. The paper shows that at incomplete closure of BLSS containing SLS there is a problem of nitrogen balancing. To compensate for the removal of nitrogen from the system in urine and feces, it is necessary to introduce food and a nitrogen-containing additive. c2005 COSPAR. Published by Elsevier Ltd. All rights reserved.
Navarro, J. Alexander; Kohl, Katrin S.; Cetron, Martin S.; Markel, Howard
2017-01-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. PMID:26921384
Navarro, J Alexander; Kohl, Katrin S; Cetron, Martin S; Markel, Howard
2016-06-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. Copyright © 2016 by Duke University Press.
40 CFR 267.112 - What procedures must I follow?
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (1) Events leading to a change in the closure plan, and therefore requiring a modification, may include: (i) A change in the operating plan or facility design; (ii) A change in the expected year of...
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
2017-10-01
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less
40 CFR 146.93 - Post-injection site care and site closure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-07-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-05-01
In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less
The closure problem for turbulence in meteorology and oceanography
NASA Technical Reports Server (NTRS)
Pierson, W. J., Jr.
1985-01-01
The dependent variables used for computer based meteorological predictions and in plans for oceanographic predictions are wave number and frequency filtered values that retain only scales resolvable by the model. Scales unresolvable by the grid in use become 'turbulence'. Whether or not properly processed data are used for initial values is important, especially for sparce data. Fickian diffusion with a constant eddy diffusion is used as a closure for many of the present models. A physically realistic closure based on more modern turbulence concepts, especially one with a reverse cascade at the right times and places, could help improve predictions.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-13
... Subtitle C barrier, a multi-layer barrier designed to provide 500-year protection. \\2\\ Under Tank Closure..., which means the tanks, ancillary equipment, and contaminated soil would be removed, and the remaining... Hanford barrier, a multi- layer barrier designed to provide 1,000-year protection. Alternative 6: All...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the wastes, application of advanced technology, or alternative disposal, treatment, or re-use.... 265.118 Section 265.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...
Remotely operated pipe connector
Josefiak, Leonard J.; Cramer, Charles E.
1988-01-01
An apparatus for remotely assembling and disassembling a Graylock type coctor between a pipe and a closure for the pipe includes a base and a receptacle on the base for the closure. The pipe is moved into position vertically above the closure by a suitable positioning device such that the flange on the pipe is immediately adjacent and concentric with the flange on the closure. A moving device then moves two semicircular collars from a position free of the closure to a position such that the interior cam groove of each collar contacts the two flanges. Finally, a tensioning device automatically allows remote tightening and loosening of a nut and bolt assembly on each side of the collar to cause a seal ring located between the flanges to be compressed and to seal the closure. Release of the pipe and the connector is accomplished in the reverse order. Preferably, the nut and bolt assembly includes an elongate shaft portion on which a removable sleeve is located.
Obasare, Edinrin; Mainigi, Sumeet K; Morris, D Lynn; Slipczuk, Leandro; Goykhman, Igor; Friend, Evan; Ziccardi, Mary Rodriguez; Pressman, Gregg S
2018-05-01
Accurate assessment of the left atrial appendage (LAA) is important for pre-procedure planning when utilizing device closure for stroke reduction. Sizing is traditionally done with transesophageal echocardiography (TEE) but this is not always precise. Three-dimensional (3D) printing of the LAA may be more accurate. 24 patients underwent Watchman device (WD) implantation (71 ± 11 years, 42% female). All had complete 2-dimensional TEE. Fourteen also had cardiac computed tomography (CCT) with 3D printing to produce a latex model of the LAA for pre-procedure planning. Device implantation was unsuccessful in 2 cases (one with and one without a 3D model). The model correlated perfectly with implanted device size (R 2 = 1; p < 0.001), while TEE-predicted size showed inferior correlation (R 2 = 0.34; 95% CI 0.23-0.98, p = 0.03). Fisher's exact test showed the model better predicted final WD size than TEE (100 vs. 60%, p = 0.02). Use of the model was associated with reduced procedure time (70 ± 20 vs. 107 ± 53 min, p = 0.03), anesthesia time (134 ± 31 vs. 182 ± 61 min, p = 0.03), and fluoroscopy time (11 ± 4 vs. 20 ± 13 min, p = 0.02). Absence of peri-device leak was also more likely when the model was used (92 vs. 56%, p = 0.04). There were trends towards reduced trans-septal puncture to catheter removal time (50 ± 20 vs. 73 ± 36 min, p = 0.07), number of device deployments (1.3 ± 0.5 vs. 2.0 ± 1.2, p = 0.08), and number of devices used (1.3 ± 0.5 vs. 1.9 ± 0.9, p = 0.07). Patient specific models of the LAA improve precision in closure device sizing. Use of the printed model allowed rapid and intuitive location of the best landing zone for the device.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feist, E.T.
2012-07-01
Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less
Sampling and monitoring for closure
McLemore, Virginia T.; Smith, Kathleen S.; Russell, Carol C.
2007-01-01
An important aspect of planning a new mine or mine expansion within the modern regulatory framework is to design for ultimate closure. Sampling and monitoring for closure is a form of environmental risk management. By implementing a sampling and monitoring program early in the life of the mining operation, major costs can be avoided or minimized. The costs for treating mine drainage in perpetuity are staggering, especially if they are unanticipated. The Metal Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS), a cooperative government-industry-academia organization, was established to address drainage-quality technologies of metal mining and metallurgical operations. ADTI-MMS recommends that sampling and monitoring programs consider the entire mine-life cycle and that data needed for closure of an operation be collected from exploration through postclosure.
NASA Astrophysics Data System (ADS)
Voumard, Jérémie; Derron, Marc-Henri; Jaboyedoff, Michel
2017-04-01
The Weisstannen small alpine valley located in the Canton of St-Gallen, Switzerland, has been affected by four different natural hazards these three last years. Its unique access road has been cut off height times during this period: by an earth slide in January 2014, by three debris flows in August 2015, by one debris flow in September 2016, by two floods in June and July 2016 and by a rockfall in May 2016. Although the valley is sparsely populated, 240 people have been affected by the height road closures due to these events. In addition to road damages, several buildings, of which a restaurant (with EUR 190'000 damages) and an animal shelter, have been damaged. In Switzerland, some roads of 15 communes have been affected by natural hazards at least three times in five years (2012-2016). Then the Weisstannen valley is not an exception at the communal level. However, it is the only valley whose unique access was cut off three consecutive years. With these repeated events, the population of the valley does not understand how possible it is to end up in such a situation in a country accustomed to natural hazards. In the media and social media, people do not hide their irritation regarding to this situation: "Have the authorities failed to take into account natural dangers despite of the 4.7 million Euro allocated for a flood protection project? Who is responsible of those repeated damages? Why the situation did not improve after the events of the first year and then the second year? ". In the present work, we try to shed the light on this peculiar case analysing the causes of road closures, studying meteorological, topographical, hydrological and geological data for each events. The effectiveness of the new protective measures built between the events are assessed, as the future planned protectives measures. Road closures consequences on the population and the economy are also estimated. Finally, we estimate the probability of having new road closures in the Weisstannen valley during the next years. Data about the events were documented during field visit, or obtained from the media and official reports.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Petrello, Jaclyn
This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
2014-03-03
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less
Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less
Engineering criteria for fracture flowback procedures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barree, R.D.; Mukherjee, H.
1995-12-31
Post treatment fracture flowback procedures during closure are often critical to the retention of fracture conductivity near the wellbore. Postfrac production performance largely depends on this conductivity. The importance of proper flowback procedure has been documented in the fracture industry, but definitive guidelines for flowback design have never been established. As a result, many misconceptions exist regarding the physics of proppant flowback and its effects on the final proppant distribution in the fracture. This paper presents a rigorous study of fracture flowback and proppant migration during closure using a fully three-dimensional fracture geometry simulator (GOHFER). The effects of rate ofmore » flowback, location of the perforation interval, final proppant concentration, and the fracture geometry prior to flowback on the retained post closure proppant concentration are discussed. Consideration is given to the fluid velocity field in the created fracture resulting from the flowback, and its effects on proppant movement and localized fracture closure. These studies illustrate the difference between ``forced closure`` and ``reverse screenout`` concepts in flowback design. Other effects such as crossflow between multiple perforated layers are also studied. Simulation studies indicate that selection of a desirable flowback rate is very sensitive to crossflow effects resulting from induced fractures in multiple stress layers. This crossflow can result in significant overflushing of proppant in the lower stress zones, if not countered by properly applied flowback procedures.« less
Navier-Stokes computation of compressible turbulent flows with a second order closure, part 1
NASA Technical Reports Server (NTRS)
Haminh, Hieu; Kollmann, Wolfgang; Vandromme, Dany
1990-01-01
A second order closure turbulence model for compressible flows is developed and implemented in a 2D Reynolds-averaged Navier-Stokes solver. From the beginning where a kappa-epsilon turbulence model was implemented in the bidiagonal implicit method of MACCORMACK (referred to as the MAC3 code) to the final stage of implementing a full second order closure in the efficient line Gauss-Seidel algorithm, numerous work was done, individually and collectively. Besides the collaboration itself, the final product of this work is a second order closure derived from the Launder, Reece, and Rodi model to account for near wall effects, which has been called FRAME model, which stands for FRench-AMerican-Effort. During the reporting period, two different problems were worked out. The first was to provide Ames researchers with a reliable compressible boundary layer code including a wide collection of turbulence models for quick testing of new terms, both in two equations and in second order closure (LRR and FRAME). The second topic was to complete the implementation of the FRAME model in the MAC5 code. The work related to these two different contributions is reported. dilatation in presence of stron shocks. This work, which has been conducted during a work at the Center for Turbulence Research with Zeman aimed also to cros-check earlier assumptions by Rubesin and Vandromme.
Fumanelli, Laura; Ajelli, Marco; Merler, Stefano; Ferguson, Neil M.; Cauchemez, Simon
2016-01-01
School closure policies are among the non-pharmaceutical measures taken into consideration to mitigate influenza epidemics and pandemics spread. However, a systematic review of the effectiveness of alternative closure policies has yet to emerge. Here we perform a model-based analysis of four types of school closure, ranging from the nationwide closure of all schools at the same time to reactive gradual closure, starting from class-by-class, then grades and finally the whole school. We consider policies based on triggers that are feasible to monitor, such as school absenteeism and national ILI surveillance system. We found that, under specific constraints on the average number of weeks lost per student, reactive school-by-school, gradual, and county-wide closure give comparable outcomes in terms of optimal infection attack rate reduction, peak incidence reduction or peak delay. Optimal implementations generally require short closures of one week each; this duration is long enough to break the transmission chain without leading to unnecessarily long periods of class interruption. Moreover, we found that gradual and county closures may be slightly more easily applicable in practice as they are less sensitive to the value of the excess absenteeism threshold triggering the start of the intervention. These findings suggest that policy makers could consider school closure policies more diffusely as response strategy to influenza epidemics and pandemics, and the fact that some countries already have some experience of gradual or regional closures for seasonal influenza outbreaks demonstrates that logistic and feasibility challenges of school closure strategies can be to some extent overcome. PMID:26796333
Fumanelli, Laura; Ajelli, Marco; Merler, Stefano; Ferguson, Neil M; Cauchemez, Simon
2016-01-01
School closure policies are among the non-pharmaceutical measures taken into consideration to mitigate influenza epidemics and pandemics spread. However, a systematic review of the effectiveness of alternative closure policies has yet to emerge. Here we perform a model-based analysis of four types of school closure, ranging from the nationwide closure of all schools at the same time to reactive gradual closure, starting from class-by-class, then grades and finally the whole school. We consider policies based on triggers that are feasible to monitor, such as school absenteeism and national ILI surveillance system. We found that, under specific constraints on the average number of weeks lost per student, reactive school-by-school, gradual, and county-wide closure give comparable outcomes in terms of optimal infection attack rate reduction, peak incidence reduction or peak delay. Optimal implementations generally require short closures of one week each; this duration is long enough to break the transmission chain without leading to unnecessarily long periods of class interruption. Moreover, we found that gradual and county closures may be slightly more easily applicable in practice as they are less sensitive to the value of the excess absenteeism threshold triggering the start of the intervention. These findings suggest that policy makers could consider school closure policies more diffusely as response strategy to influenza epidemics and pandemics, and the fact that some countries already have some experience of gradual or regional closures for seasonal influenza outbreaks demonstrates that logistic and feasibility challenges of school closure strategies can be to some extent overcome.
DOE Office of Scientific and Technical Information (OSTI.GOV)
HOPKINS, A.M.
2005-02-23
The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-07
... Department exercised its discretion to toll deadlines for the duration of the closure of the Federal... Government Closure During the Recent Snowstorms,'' dated February 12, 2010. On April 21, 2010, the Department... encasing one-and-one half inches of sharpened lead on one end and a rubber eraser on the other end...
Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.
Ergene Şentürk, Didar; Alp, Emre
2016-11-01
Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finley, Robert; Payne, William; Kirksey, Jim
2015-06-01
The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.
Patient-specific catheter shaping for the minimally invasive closure of the left atrial appendage.
Graf, Eva C; Ott, Ilka; Praceus, Julian; Bourier, Felix; Lueth, Tim C
2018-06-01
The minimally invasive closure of the left atrial appendage is a promising alternative to anticoagulation for stroke prevention in patients suffering from atrial fibrillation. One of the challenges of this procedure is the correct positioning and the coaxial alignment of the tip of the catheter sheath to the implant landing zone. In this paper, a novel preoperative planning system is proposed that allows patient-individual shaping of catheters to facilitate the correct positioning of the catheter sheath by offering a patient-specific catheter shape. Based on preoperative three-dimensional image data, anatomical points and the planned implant position are marked interactively and a patient-specific catheter shape is calculated if the standard catheter is not considered as suitable. An approach to calculate a catheter shape with four bends by maximization of the bending radii is presented. Shaping of the catheter is supported by a bending form that is automatically generated in the planning program and can be directly manufactured by using additive manufacturing methods. The feasibility of the planning and shaping of the catheter could be successfully shown using six data sets. The patient-specific catheters were tested in comparison with standard catheters by physicians on heart models. In four of the six tested models, the participating physicians rated the patient-individual catheters better than the standard catheter. The novel approach for preoperatively planned and shaped patient-specific catheters designed for the minimally invasive closure of the left atrial appendage could be successfully implemented and a feasibility test showed promising results in anatomies that are difficult to access with the standard catheter.
County of Hawaii Department of Public Works: Consent Agreement and Final Order (2005)
Consent Agreement and Final Order for The County of Hawaii Department of Public Works, Hilo, Hawaii, including proposed order of compliance, closure of large capacity cesspools. Docket no. UIC-AO-2005-0013
Interferometric Imaging Directly with Closure Phases and Closure Amplitudes
NASA Astrophysics Data System (ADS)
Chael, Andrew A.; Johnson, Michael D.; Bouman, Katherine L.; Blackburn, Lindy L.; Akiyama, Kazunori; Narayan, Ramesh
2018-04-01
Interferometric imaging now achieves angular resolutions as fine as ∼10 μas, probing scales that are inaccessible to single telescopes. Traditional synthesis imaging methods require calibrated visibilities; however, interferometric calibration is challenging, especially at high frequencies. Nevertheless, most studies present only a single image of their data after a process of “self-calibration,” an iterative procedure where the initial image and calibration assumptions can significantly influence the final image. We present a method for efficient interferometric imaging directly using only closure amplitudes and closure phases, which are immune to station-based calibration errors. Closure-only imaging provides results that are as noncommittal as possible and allows for reconstructing an image independently from separate amplitude and phase self-calibration. While closure-only imaging eliminates some image information (e.g., the total image flux density and the image centroid), this information can be recovered through a small number of additional constraints. We demonstrate that closure-only imaging can produce high-fidelity results, even for sparse arrays such as the Event Horizon Telescope, and that the resulting images are independent of the level of systematic amplitude error. We apply closure imaging to VLBA and ALMA data and show that it is capable of matching or exceeding the performance of traditional self-calibration and CLEAN for these data sets.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawless, W.F.
2013-07-01
Citizen involvement in DOE's decision-making for the environmental cleanup from DOE's management of its nuclear wastes across the DOE complex has had a positive effect on the cleanup of its SRS site, characterized by an acceleration of cleanup not only for the Transuranic wastes at SRS, but also for DOE's first two closures of HLW tanks, both of which occurred at SRS. The Citizens around SRS had pushed successfully for the closures of Tanks 17 and 20 in 1997, becoming the first closures of HLW tanks under regulatory guidance in the USA. However, since then, HLW tank closures ceased duemore » to a lawsuit, the application of new tank clean-up technology, interagency squabbling between DOE and NRC over tank closure criteria, and finally and almost fatally, from budget pressures. Despite an agreement with its regulators for the closure of Tanks 18 and 19 by the end of calendar year 2012, the outlook in Fall 2011 to close these two tanks had dimmed. It was at this point that the citizens around SRS became reengaged with tank closures, helping DOE to reach its agreed upon milestone. (authors)« less
Orthodontic Replacement of Lost Permanent Molar with Neighbor Molar: A Six-Year Follow-Up
Shintcovsk, Ricardo Lima; Knop, Luegya Amorim Henriques; Sampaio, Luana Paz
2017-01-01
Extraction is very frequent indication in orthodontic planning, especially when there are crowding, biprotrusion, and aesthetically unpleasant profiles. Next to extraction comes space closure, which represents a challenge for orthodontists because of extended treatment time, discomfort created for the patient, tissue tolerance, and stability concerns. When it comes to what mechanics to choose for space closure, loops present two major advantages in relation to sliding mechanics: absence of abrasion and possibility to reach pure dental translation. A case is presented where an adult female patient with early loss of the first lower permanent molars, minor lower crowding, and tooth biprotrusion was treated with upper first bicuspids extraction along with upper and lower space closure done with T-loops to promote best space closure control in order to correct the malocclusion and enhance facial aesthetics. PMID:29318054
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, Thomas; Patterson, Russell; Camphouse, Chris
There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotatedmore » Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)« less
A prospective study of two methods of closing surgical scalp wounds.
Adeolu, A A; Olabanji, J K; Komolafe, E O; Ademuyiwa, A O; Awe, A O; Oladele, A O
2012-02-01
Scalp wounds are commonly closed in two layers, although single layer closure is feasible. This study prospectively compared the two methods of closing scalp wounds. Patients with non-traumatic scalp wounds were allocated to either the single layer closure group or the multilayer closure group. We obtained relevant data from the patients. The primary outcome measures were wound edge related complications, rate of suturing and cost of sutures used for suturing. Thirty-one wounds were in the single layer closure group and 30 were in the multilayer closure group. Age range was 1-80 years. The most common indication for making a scalp incision was subdural hematoma, representing 27.8% of all the indications. The most common surgery was burr hole drainage of subdural hematoma. Polyglactin acid suture was used for the inner layer and polyamide -00- for the final layer in the multilayer closure group. Only the latter suture was used for the single layer closure method. Total cost of suturing per wound in the single layer closure group was N= 100 (0.70USD) and N= 800 (5.30USD) in the multilayer group. The mean rate of closure was 0.39 ± 1.89 mm/sec for single layer closure and 0.23 ± 0.89 mm/sec in multilayer closure. The difference was statistically significant. Wound edge related complication rate was 19.35% in the single layer closure group and 16.67% in the multilayer closure method group. The difference was not statistically significant (z: 0.00, p value: 1.000; Pearson chi-squared (DF = 1)= 0.0075, p = 0.0785). The study shows that closing the scalp in one layer is much faster and more cost effective compared to the multilayer closure method. We did not observe significant difference in the complication rates in the two methods of closure. Long-term outcome, especially cosmetic outcome, remains to be determined in this preliminary study.
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
2013 Advanced Environmental Health/Advanced Food Technology Standing Review Panel Final Report
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2014-01-01
The 2013 Advanced Environmental Health/Advanced Food Technology (AEH/AFT) Standing Review Panel (from here on referred to as the SRP) participated in a WebEx/teleconference with members of the Space Human Factors and Habitability (SHFH) Element, representatives from the Human Research Program (HRP), and NASA Headquarters on November 22, 2013 (list of participants is in Section IX of this report). The SRP reviewed the updated research plans for the Risk of Adverse Health Effects Due to Alterations in Host-Microorganism Interactions (Host Microbe Risk) and the Risk of Performance Decrement and Crew Illness Due to an Inadequate Food System (Food Risk). The SRP also received a status update on the Risk of Adverse Health Effects of Exposure to Dust and Volatiles during Exploration of Celestial Bodies (Dust Risk). Overall, the SRP was impressed with the strong research plans presented by the scientists and staff associated with the SHFH Element. The SRP also thought that the updated research plans were thorough, well organized, and presented in a comprehensive manner. The SRP agrees with the changes made to the Host Microbe Risk and Food Risk portfolios and thinks that the targets for Gap closure are appropriate.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less
Stec, Andrew A; Baradaran, Nima; Schaeffer, Anthony; Gearhart, John P; Matthews, Ranjiv I
2012-10-01
Successful primary bladder closure of classic bladder exstrophy sets the stage for development of adequate bladder capacity and eventual voided continence. The postoperative pathway following primary bladder closure at the authors' institution is quantitatively and qualitatively detailed. Sixty-five consecutive newborns (47 male) undergoing primary closure of classic bladder exstrophy were identified and data were extracted relating to immediate postoperative care. Overall success rate was utilized to validate the pathway. Mean age at time of primary closure was 4.6 days and mean hospital stay was 35.8 days. Osteotomy was performed in 19 patients (mean age 8.8 days), and was not required in 39 infants (mean age 2.9 days). All patients were immobilized for 4 weeks. Tunneled epidural analgesia was employed in 61/65 patients. All patients had ureteral catheters and a suprapubic tube, along with a comprehensive antibiotic regimen. Postoperative total parenteral nutrition was commonly administered, and enteral feedings started around day 4.6. Our success rate of primary closure was 95.4%. A detailed and regimented plan for bladder drainage, immobilization, pain control, nutrition, antimicrobial prophylaxis, and adequate healing time is a cornerstone for the postoperative management of the primary closure of bladder exstrophy. Copyright © 2011 Journal of Pediatric Urology Company. Published by Elsevier Ltd. All rights reserved.
Final Closure Letter for Administrative Complaint Numbers 03R-07-R9, 10R-07-R9 and 01R-11R9
On 6-7-2017, ECRCO issued a closure letter for Admin Complaint Numbers 03r-07-r9, 10r-07-r9 and 01r-11-r9 involving the Maricopa County Air Quality Department regarding alleged complaints that MCAQD violated Title 6 of the Civil Rights Act of 1964.
2009-06-16
resolution of disapproval is passed by Congress. Following the actual base closings and realignments, DOD develops an environmental remediation plan...examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base Closures: DOD’s 2005 Internal Selection...review and remediation . 2 Prior to the 1988 BRAC round, military installations were closed, or their missions were altered by order of the Secretary of
PFO and Migraine: Is There a Role for Closure?
Rayhill, Melissa; Burch, Rebecca
2017-03-01
Observational studies suggest that closure of a patent foramen ovale for other indications may reduce or even eliminate migraine attacks, particularly migraine with aura. The first randomized clinical trial of patent foramen ovale (PFO) closure for prevention of migraine, the MIST trial, showed negative results. The results of the other two completed studies in this area have recently been published in the last year. PRIMA and PREMIUM were also both negative for their primary endpoints. The PREMIUM trial did show a reduction in headache days in the migraine with aura subgroup but the final results of this subset analysis have not been published. There may be an as yet undetermined subgroup of patients with migraine who would benefit from closure, but slow recruitment has been a barrier to further study. Several potentially life-threatening procedure-related adverse events occurred in the clinical trials. At this time, we recommend against offering PFO closure as a preventive treatment for migraine. Based on available observational data, patients for whom PFO closure is indicated for other reasons may see some improvement in their migraines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
Understanding the Risk Factors of Trauma Center Closures
Shen, Yu-Chu; Hsia, Renee Y.; Kuzma, Kristen
2011-01-01
Objectives We analyze whether hazard rates of shutting down trauma centers are higher due to financial pressures or in areas with vulnerable populations (such as minorities or the poor). Materials and Methods This is a retrospective study of all hospitals with trauma center services in urban areas in the continental US between 1990 and 2005, identified from the American Hospital Association Annual Surveys. These data were linked with Medicare cost reports, and supplemented with other sources, including the Area Resource File. We analyze the hazard rates of trauma center closures among several dimensions of risk factors using discrete-time proportional hazard models. Results The number of trauma center closures increased from 1990 to 2005, with a total of 339 during this period. The hazard rate of closing trauma centers in hospitals with a negative profit margin is 1.38 times higher than those hospitals without the negative profit margin (P < 0.01). Hospitals receiving more generous Medicare reimbursements face a lower hazard of shutting down trauma centers (ratio: 0.58, P < 0.01) than those receiving below average reimbursement. Hospitals in areas with higher health maintenance organizations penetration face a higher hazard of trauma center closure (ratio: 2.06, P < 0.01). Finally, hospitals in areas with higher shares of minorities face a higher risk of trauma center closure (ratio: 1.69, P < 0.01). Medicaid load and uninsured populations, however, are not risk factors for higher rates of closure after we control for other financial and community characteristics. Conclusions Our findings give an indication on how the current proposals to cut public spending could exacerbate the trauma closure particularly among areas with high shares of minorities. In addition, given the negative effect of health maintenance organizations on trauma center survival, the growth of Medicaid managed care population should be monitored. Finally, high shares of Medicaid or uninsurance by themselves are not independent risk factors for higher closure as long as financial pressures are mitigated. Targeted policy interventions and further research on the causes, are needed to address these systems-level disparities. PMID:19704354
Shen, Yu-Chu; Hsia, Renee Y; Kuzma, Kristen
2009-09-01
We analyze whether hazard rates of shutting down trauma centers are higher due to financial pressures or in areas with vulnerable populations (such as minorities or the poor). This is a retrospective study of all hospitals with trauma center services in urban areas in the continental US between 1990 and 2005, identified from the American Hospital Association Annual Surveys. These data were linked with Medicare cost reports, and supplemented with other sources, including the Area Resource File. We analyze the hazard rates of trauma center closures among several dimensions of risk factors using discrete-time proportional hazard models. The number of trauma center closures increased from 1990 to 2005, with a total of 339 during this period. The hazard rate of closing trauma centers in hospitals with a negative profit margin is 1.38 times higher than those hospitals without the negative profit margin (P < 0.01). Hospitals receiving more generous Medicare reimbursements face a lower hazard of shutting down trauma centers (ratio: 0.58, P < 0.01) than those receiving below average reimbursement. Hospitals in areas with higher health maintenance organizations penetration face a higher hazard of trauma center closure (ratio: 2.06, P < 0.01). Finally, hospitals in areas with higher shares of minorities face a higher risk of trauma center closure (ratio: 1.69, P < 0.01). Medicaid load and uninsured populations, however, are not risk factors for higher rates of closure after we control for other financial and community characteristics. Our findings give an indication on how the current proposals to cut public spending could exacerbate the trauma closure particularly among areas with high shares of minorities. In addition, given the negative effect of health maintenance organizations on trauma center survival, the growth of Medicaid managed care population should be monitored. Finally, high shares of Medicaid or uninsurance by themselves are not independent risk factors for higher closure as long as financial pressures are mitigated. Targeted policy interventions and further research on the causes, are needed to address these systems-level disparities.
75 FR 81640 - Record of Decision
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... on the Final Environmental Impact Statement/Cape Hatteras National Seashore Off-Road Vehicle... Environmental Impact Statement (Final EIS) for the Cape Hatteras National Seashore (Seashore) Off-Road Vehicle... temporary ORV use restrictions, for such things as ramp maintenance, resource and public safety closures...
Sampling and monitoring for closure
McLemore, V.T.; Russell, C.C.; Smith, K.S.
2004-01-01
The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.
Humid site stabilization and closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cutshall, N.H.
1981-01-01
The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less
Long-term follow-up after transvenous single coil embolization of patent ductus arteriosus in dogs.
Hildebrandt, N; Schneider, C; Schweigl, T; Schneider, M
2010-01-01
Long-term follow-up studies after interventional therapy of patent ductus arteriosus (PDA) in dogs are rare. Transvenous PDA embolization with a single detachable coil is a highly effective method in patients with an angiographically determined PDA≤4.0 mm. Twenty-eight dogs with an angiographic PDA≤4.0 mm were included. Prospective follow-up study after PDA coil embolization. The median follow-up time was 792 days (range, 2-3, 248 days). The rate of complete closure demonstrated by Doppler color flow was 54% at day 3 after intervention and the final cumulative rate was 71%. The rate of complete closure was significantly different between small and moderately sized PDA over the study period (P<.0001) and finally was 100 and 50%, respectively. In 16 dogs with complete closure, no recanalization was found. Disappearance of the continuous heart murmur was found in 89% after 3 days, and this increased to a final cumulative rate of 96%. Indexed left ventricular internal diameter in diastole (LVDd-I) decreased significantly (P<.0001). In the group with moderately sized PDA, a significant difference (P=.0256) was seen in LVDd-I between patients with and without residual shunt after exclusion of patients with persistent severe mitral valve regurgitation. Long-term follow-up after single coil embolization showed complete closure in all small PDA but a residual shunt with mild hemodynamic consequences was present in half of the moderately sized PDA. Copyright © 2010 by the American College of Veterinary Internal Medicine.
Arango-Lasprilla, Juan Carlos; Ketchum, Jessica M; Hurley, Jessica; Getachew, Almaz M; Gary, Kelli Williams
2014-01-01
Approximately 25% of working-aged Americans with disabilities work full or part time, yet still face discrimination despite the passing of the American's with Disabilities Act (ADA) over 20 years ago. To determine if the proportion of allegations of ADA Title I workplace discrimination with merit closed at any year between 1993 and 2008 differs among Whites, African Americans, Hispanics, and Asians; to determine if there was a change over time from 1993 to 2008 in merit closure rate within each race/ethnicity group; and to determine whether changes over time between 1993 and 2008 in the merit closure rate differ among the race/ethnicity groups. Logistic regression was used for this cross-sectional panel study to model the merit closure rate for each ethnic group from 1993 to 2008 using 318,587 charging parties from the EEOC database. All ethnic groups exhibited significant changes over time in the merit closure rate. There were significant differences in the closure rates among the race/ethnicity groups specifically at closure years 1995-2000, 2002, 2003, and 2006. Finally, there was evidence that the trends in merit closure rates over time differed significantly among the race/ethnicity groups. There was significant evidence that the proportion of claims closed with merit was significantly different among the racial/ethnicity groups.
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less
Watershed planning, implementation and assessment: the May River Watershed Action Plan case study
Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie
2016-01-01
Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... available on the DOE NEPA Web site at http://energy.gov/nepa . Additional information on the Final TC & WM... INFORMATION CONTACT: For further information on the Final TC & WM EIS, contact Ms. Burandt as listed in...
Strategic Planning: Renewal and Redesign during Turbulent Times
ERIC Educational Resources Information Center
Cherrey, Cynthia; Clark, Evette Castillo
2010-01-01
In August 2005, Hurricane Katrina, the worst natural disaster in the history of the United States, forced the fall semester closure of Tulane University in New Orleans, Louisiana. In the aftermath of this unprecedented storm, the Tulane leadership set forth a plan for renewal to secure the survival, recovery, and sustainability of the institution,…
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
A nonlocal fluid closure for antiparallel reconnection
NASA Astrophysics Data System (ADS)
Ng, J.; Hakim, A.; Bhattacharjee, A.
2016-12-01
The integration of kinetic effects in fluid models is an important problem in global simulations of the Earth's magnetosphere and space weather modelling. In particular, it has been shown that ion kinetics play an important role in the dynamics of large reconnecting systems, and that fluid models can account of some of these effects[1,2] . Here we introduce a new fluid model and closure for collisionless magnetic reconnection and more general applications. Taking moments of the kinetic equation, we evolve the full pressure tensor for electrons and ions, which includes the off diagonal terms necessary for reconnection. Kinetic effects are recovered by using a nonlocal heat flux closure, which approximates linear Landau damping in the fluid framework [3]. Using the island coalescence problem as a test, we show how the nonlocal ion closure improves on the typical collisional closures used for ten-moment models and circumvents the need for a colllisional free parameter. Finally, we extend the closure to study guide-field reconnection and discuss the implementation of a twenty-moment model.[1] A. Stanier et al. Phys Rev Lett (2015)[2] J. Ng et al. Phys Plasmas (2015)[3] G. Hammett et al. Phys Rev Lett (1990)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2010-02-28
Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less
Fleming, Padhraig S; Seehra, Jadbinder; Dibiase, Andrew T
2011-01-01
A history of traumatic dental injury to the maxillary central incisors during preadolescence or adolescence is common and may result in premature loss. Treatment options include prosthetic implant replacement, autotransplantation, and orthodontic space closure with direct composite recontouring. This case report describes the treatment of an adolescent girl who presented with a crowded Class I malocclusion complicated by a history of trauma to the maxillary central incisors. The treatment plan consisted of orthodontic space closure following loss of both maxillary central incisors and mandibular premolars. This case highlights that orthodontic space closure can be a valuable treatment option in selected Class I crowded and Class II uncrowded malocclusions, producing predictable and efficient results.
Diener, Markus K; Seiler, Christoph M; Rossion, Inga; Kleeff, Jörg; Glanemann, Matthias; Butturini, Giovanni; Tomazic, Ales; Bruns, Christiane J; Busch, Olivier R C; Farkas, Stefan; Belyaev, Orlin; Neoptolemos, John P; Halloran, Christopher; Keck, Tobias; Niedergethmann, Marco; Gellert, Klaus; Witzigmann, Helmut; Kollmar, Otto; Langer, Peter; Steger, Ulrich; Neudecker, Jens; Berrevoet, Frederik; Ganzera, Silke; Heiss, Markus M; Luntz, Steffen P; Bruckner, Thomas; Kieser, Meinhard; Büchler, Markus W
2011-04-30
The ideal closure technique of the pancreas after distal pancreatectomy is unknown. We postulated that standardised closure with a stapler device would prevent pancreatic fistula more effectively than would a hand-sewn closure of the remnant. This multicentre, randomised, controlled, parallel group-sequential superiority trial was done in 21 European hospitals. Patients with diseases of the pancreatic body and tail undergoing distal pancreatectomy were eligible and were randomly assigned by central randomisation before operation to either stapler or hand-sewn closure of the pancreatic remnant. Surgical performance was assessed with intraoperative photo documentation. The primary endpoint was the combination of pancreatic fistula and death until postoperative day 7. Patients and outcome assessors were masked to group assignment. Interim and final analysis were by intention to treat in all patients in whom a left resection was done. This trial is registered, ISRCTN18452029. Between Nov 16, 2006, and July 3, 2009, 450 patients were randomly assigned to treatment groups (221 stapler; 229 hand-sewn closure), of whom 352 patients (177 stapler, 175 hand-sewn closure) were analysed. Pancreatic fistula rate or mortality did not differ between stapler (56 [32%] of 177) and hand-sewn closure (49 [28%] of 175; OR 0·84, 95% CI 0·53–1·33; p=0·56). One patient died within the fi rst 7 days after surgery in the hand-sewn group; no deaths occurred in the stapler group. Serious adverse events did not differ between groups. Stapler closure did not reduce the rate of pancreatic fistula compared with hand-sewn closure for distal pancreatectomy. New strategies, including innovative surgical techniques, need to be identified to reduce this adverse outcome. German Federal Ministry of Education and Research.
2017-04-28_B61-12-Program Overview(OUO).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniels, Vonceil
2017-04-01
The B61-12 LEP is currently executing Phase 6.4 Production Engineering with a focus on qualification and preproduction activities. All major milestones have been successfully completed to date. Component Final Design Reviews (FDRs) continue in FY17, with 19 of 38 complete as of April 28. A series of normal and abnormal environments tests occurred in the first half of FY17, and the first qualification flight test on an F-16 was executed in March. Two F-15 qualification flight tests are planned in August. To support Pantex readiness, the first all-up-round (AUR) trainer builds were completed in December 2016. Progress is ongoing towardmore » closure of Air Force Nuclear Weapons Center (tailkit) and Los Alamos National Laboratory interface gaps, and resolution of producibility challenges with the Kansas City National Security Campus (KCNSC).« less
School closures during the 2009 influenza pandemic: national and local experiences
2014-01-01
Background School closure is a non-pharmaceutical intervention that was considered in many national pandemic plans developed prior to the start of the influenza A(H1N1)pdm09 pandemic, and received considerable attention during the event. Here, we retrospectively review and compare national and local experiences with school closures in several countries during the A(H1N1)pdm09 pandemic. Our intention is not to make a systematic review of country experiences; rather, it is to present the diversity of school closure experiences and provide examples from national and local perspectives. Methods Data were gathered during and following a meeting, organized by the European Centres for Disease Control, on school closures held in October 2010 in Stockholm, Sweden. A standard data collection form was developed and sent to all participants. The twelve participating countries and administrative regions (Bulgaria, China, France, Hong Kong Special Administrative Region (SAR), Italy, Japan, New Zealand, Serbia, South Africa, Thailand, United Kingdom, and United States) provided data. Results Our review highlights the very diverse national and local experiences on school closures during the A(H1N1)pdm09 pandemic. The processes including who was in charge of making recommendations and who was in charge of making the decision to close, the school-based control strategies, the extent of school closures, the public health tradition of responses and expectations on school closure varied greatly between countries. Our review also discusses the many challenges associated with the implementation of this intervention and makes recommendations for further practical work in this area. Conclusions The single most important factor to explain differences observed between countries may have been the different public health practises and public expectations concerning school closures and influenza in the selected countries. PMID:24739814
32 CFR 174.18 - Historic preservation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...
32 CFR 174.18 - Historic preservation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...
Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less
Semb, Gunvor; Enemark, Hans; Friede, Hans; Paulin, Gunnar; Lilja, Jan; Rautio, Jorma; Andersen, Mikael; Åbyholm, Frank; Lohmander, Anette; Shaw, William; Mølsted, Kirsten; Heliövaara, Arja; Bolund, Stig; Hukki, Jyri; Vindenes, Hallvard; Davenport, Peter; Arctander, Kjartan; Larson, Ola; Berggren, Anders; Whitby, David; Leonard, Alan; Neovius, Erik; Elander, Anna; Willadsen, Elisabeth; Bannister, R Patricia; Bradbury, Eileen; Henningsson, Gunilla; Persson, Christina; Eyres, Philip; Emborg, Berit; Kisling-Møller, Mia; Küseler, Annelise; Granhof Black, Birthe; Schöps, Antje; Bau, Anja; Boers, Maria; Andersen, Helene Søgaard; Jeppesen, Karin; Marxen, Dorte; Paaso, Marjukka; Hölttä, Elina; Alaluusua, Suvi; Turunen, Leena; Humerinta, Kirsti; Elfving-Little, Ulla; Tørdal, Inger Beate; Kjøll, Lillian; Aukner, Ragnhild; Hide, Øydis; Feragen, Kristin Billaud; Rønning, Elisabeth; Skaare, Pål; Brinck, Eli; Semmingsen, Ann-Magritt; Lindberg, Nina; Bowden, Melanie; Davies, Julie; Mooney, Jeanette; Bellardie, Haydn; Schofield, Nina; Nyberg, Jill; Lundberg, Maria; Karsten, Agneta Linder-Aronson; Larson, Margareta; Holmefjord, Anders; Reisæter, Sigvor; Pedersen, Nina-Helen; Rasmussen, Therese; Tindlund, Rolf; Sæle, Paul; Blomhoff, Reidunn; Jacobsen, Gry; Havstam, Christina; Rizell, Sara; Enocson, Lars; Hagberg, Catharina; Najar Chalien, Midia; Paganini, Anna; Lundeborg, Inger; Marcusson, Agneta; Mjönes, Anna-Britta; Gustavsson, Annica; Hayden, Christine; McAleer, Eilish; Slevan, Emma; Gregg, Terry; Worthington, Helen
2017-02-01
Longstanding uncertainty surrounds the selection of surgical protocols for the closure of unilateral cleft lip and palate, and randomised trials have only rarely been performed. This paper is an introduction to three randomised trials of primary surgery for children born with complete unilateral cleft lip and palate (UCLP). It presents the protocol developed for the trials in CONSORT format, and describes the management structure that was developed to achieve the long-term engagement and commitment required to complete the project. Ten established national or regional cleft centres participated. Lip and soft palate closure at 3-4 months, and hard palate closure at 12 months served as a common method in each trial. Trial 1 compared this with hard palate closure at 36 months. Trial 2 compared it with lip closure at 3-4 months and hard and soft palate closure at 12 months. Trial 3 compared it with lip and hard palate closure at 3-4 months and soft palate closure at 12 months. The primary outcomes were speech and dentofacial development, with a series of perioperative and longer-term secondary outcomes. Recruitment of 448 infants took place over a 9-year period, with 99.8% subsequent retention at 5 years. The series of reports that follow this introductory paper include comparisons at age 5 of surgical outcomes, speech outcomes, measures of dentofacial development and appearance, and parental satisfaction. The outcomes recorded and the numbers analysed for each outcome and time point are described in the series. ISRCTN29932826.
43 CFR 3809.431 - When must I modify my plan of operations?
Code of Federal Regulations, 2012 CFR
2012-10-01
... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...
43 CFR 3809.431 - When must I modify my plan of operations?
Code of Federal Regulations, 2013 CFR
2013-10-01
... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...
Djer, Mulyadi M; Idris, Nikmah S; Alwi, Idrus; Wijaya, Ika P
2014-07-01
Transcatheter closure of perimembranous and muscular ventricular septal defect (VSD) has been performed widely and it has more advantages compare to surgery. However, transcatheter closure of residual VSD post operation of complex congenital heart disease is still challenging because of the complexity of anatomy and concern about device stability, so the operator should meticulously choose the most appropriate technique and device. We would like to report a case of transcatheter closure of residual VSD post Rastelli operation in a patient with double outlet right ventricle (DORV), sub-aortic VSD, severe infundibulum pulmonary stenosis (PS) and single coronary artery. The patient had undergone operations for four times, but he still had intractable heart failure that did not response to medications. On the first attempt. we closed the VSD using a VSD occluder, unfortunately the device embolized into the descending aorta, but fortunately we was able to snare it out. Then we decided to close the VSD using a patent ductus arteriosus (PDA occluder). On transesophageal echocardiography (TEE) and angiography evaluation, the device position was stable. Post transcatheter VSD closure, the patient clinical condition improved significantly and he could finally be discharged after a long post-surgery hospitalization. Based on this experience we concluded that the transcatheter closure of residual VSD in complex CHD using PDA occluder could be an effective alternative treatment.
DiBiase, Andrew T; Woodhouse, Neil R; Papageorgiou, Spyridon N; Johnson, Nicola; Slipper, Carmel; Grant, James; Alsaleh, Maryam; Khaja, Yousef; Cobourne, Martyn T
2018-04-01
A multicenter parallel 3-arm randomized clinical trial was carried out in 3 university hospitals in the United Kingdom to investigate the effect of supplemental vibratory force on space closure and treatment outcome with fixed appliances. Eighty-one subjects less than 20 years of age with mandibular incisor irregularity undergoing extraction-based fixed appliance treatment were randomly allocated to supplementary (20 minutes/day) use of an intraoral vibrational device (AcceleDent; OrthoAccel Technologies, Houston, Tex) (n = 29), an identical nonfunctional (sham) device (n = 25), or fixed-appliance only (n = 27). Space closure in the mandibular arch was measured from dental study casts taken at the start of space closure, at the next appointment, and at completion of space closure. Final records were taken at completion of treatment. Data were analyzed blindly on a per-protocol basis with descriptive statistics, 1-way analysis of variance, and linear regression modeling with 95% confidence intervals. Sixty-one subjects remained in the trial at start of space closure, with all 3 groups comparable for baseline characteristics. The overall median rate of initial mandibular arch space closure (primary outcome) was 0.89 mm per month with no difference for either the AcceleDent group (difference, -0.09 mm/month; 95% CI, -0.39 to 0.22 mm/month; P = 0.57) or the sham group (difference, -0.02 mm/month; 95% CI, -0.32 to 0.29 mm/month; P = 0.91) compared with the fixed only group. Similarly, no significant differences were identified between groups for secondary outcomes, including overall treatment duration (median, 18.6 months; P >0.05), number of visits (median, 12; P >0.05), and percentage of improvement in the Peer Assessment Rating (median, 90.0%; P >0.05). Supplemental vibratory force during orthodontic treatment with fixed appliances does not affect space closure, treatment duration, total number of visits, or final occlusal outcome. NCT02314975. The protocol was not published before trial commencement. AcceleDent units were donated by OrthoAccel Technologies; no contribution to the conduct or the writing of this study was made by the manufacturer. Copyright © 2017 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
Keogh-Brown, Marcus Richard; Smith, Richard D; Edmunds, John W; Beutels, Philippe
2010-12-01
The 2003 outbreak of severe acute respiratory syndrome (SARS) showed that infectious disease outbreaks can have notable macroeconomic impacts. The current H1N1 and potential H5N1 flu pandemics could have a much greater impact. Using a multi-sector single country computable general equilibrium model of the United Kingdom, France, Belgium and The Netherlands, together with disease scenarios of varying severity, we examine the potential economic cost of a modern pandemic. Policies of school closure, vaccination and antivirals, together with prophylactic absence from work are evaluated and their cost impacts are estimated. Results suggest GDP losses from the disease of approximately 0.5-2% but school closure and prophylactic absenteeism more than triples these effects. Increasing school closures from 4 weeks at the peak to entire pandemic closure almost doubles the economic cost, but antivirals and vaccinations seem worthwhile. Careful planning is therefore important to ensure expensive policies to mitigate the pandemic are effective in minimising illness and deaths.
Hsia, Renee Y.; Srebotnjak, Tanja; Kanzaria, Hemal K.; McCulloch, Charles; Auerbach, Andrew D.
2015-01-01
Study Objective Emergency Department (ED) closures threaten community access to emergency services, but few data exist to describe factors associated with closure. We evaluated factors associated with ED closure in California and sought to determine if hospitals serving more vulnerable populations have a higher rate of ED closure. Methods Retrospective cohort study of California hospital EDs between 1998 and 2008, using hospital and patient level data from the California Office of Statewide Planning and Development (OSHPD), as well as OSHPD Patient Discharge Data. We examined the effects of hospital and patient factors on the hospital's likelihood of ED closure using Cox proportional hazards models. Results In 4,411 hospital-years of observation, 29 of 401 (7.2%) EDs closed. In a model adjusted for total ED visits, hospital discharges, trauma center and teaching status, ownership, operating margin, and urbanicity, hospitals with more black patients (OR 1.41 per increase in proportion of blacks by 0.1, 95% CI 1.16-1.72) and Medi-Cal recipients (OR 1.17 per increase in proportion insured by Medi-Cal by 0.1, 95% CI 1.02-1.34) had higher odds for ED closure, as did for-profit institutions (OR 1.65, 95% CI 1.13-2.41). Conclusion The population served by EDs and hospitals’ profit model are associated with ED closure. Whether our findings are a manifestation of poorer reimbursement in at-risk EDs is unclear. PMID:22093435
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Kauss
2011-06-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less
Afonso Nogueira, Marta; Fiarresga, António; de Sousa, Lídia; Agapito, Ana; Galrinho, Ana; Cruz Ferreira, Rui
2016-01-01
Left ventricular pseudoaneurysm is a rare complication of acute myocardial infarction, cardiac surgery, trauma or infection. Since surgical repair is associated with high morbidity and mortality, percutaneous closure has been described as an alternative. In this regard, we present a case in which a symptomatic large left ventricular pseudoaneurysm was treated by percutaneous closure due to the patient's high surgical risk, using a double snare technique. Despite the technical difficulties, this procedure had a good final result followed by clinical success, confirming that this procedure is an effective alternative to surgery in high-risk patients. Copyright © 2016 Sociedade Portuguesa de Cardiologia. Publicado por Elsevier España, S.L.U. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schultheisz, D.; Ward, L.
1994-04-01
This report presents the results of the Community Environmental Response Facilitation Act (CERFA) investigation conducted by Environmental Resources Management (ERM) at Fort George G. Meade (FGGM), a U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA, Federal agencies are required to expeditiously identify real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed.more » Fort George G. Meade, CERFA, Base closure, BRAC.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-08-01
The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.
Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mackey, H.
1998-07-01
Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.
Diastema: correction of excessive spaces in the esthetic zone.
Oquendo, Anabella; Brea, Luis; David, Steven
2011-04-01
The presence of a diastema or diastemata between teeth is a common feature found in the anterior dentition. Many forms of therapy can be used for diastema closure. A carefully developed diagnosis and advanced planning allows the most appropriate treatment to be determined for each individual case to address the patient's needs. Clinical considerations, advantages, disadvantages, and alternative treatment modalities for diastema closure are discussed in this article and a clinical case is presented to illustrate the application of these techniques. Copyright © 2011 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2005-05-01
This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
2002-09-01
The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less
Kuroki, Lindsay M; Mullen, Mary M; Massad, L Stewart; Wu, Ningying; Liu, Jingxia; Mutch, David G; Powell, Matthew A; Hagemann, Andrea R; Thaker, Premal H; McCourt, Carolyn K; Novetsky, Akiva P
2017-07-01
To compare wound complication rates after skin closure with staples and subcuticular suture in obese gynecology patients undergoing laparotomy through a midline vertical incision. In this randomized controlled trial, women with body mass indexes (BMIs) of 30 or greater undergoing surgery by a gynecologic oncologist through a midline vertical incision were randomized to skin closure with staples or subcuticular 4-0 monofilament suture. The primary outcome was the rate of wound complication, defined as the presence of a wound breakdown, or infection, within 8 weeks postoperatively. Secondary outcomes included operative time, Stony Brook scar cosmetic score, and patient satisfaction. A sample size of 162 was planned to detect a 50% reduction in wound complications. At planned interim review (n=82), there was no significant difference in primary outcome. Between 2013 and 2016, 163 women were analyzed, including 84 who received staples and 79 suture. Women who received staples were older (mean age 59 compared with 57 years), had lower mean BMI (37.3 compared with 38.9), and fewer benign indications for surgery (22 compared with 27). There were no differences in wound complication rates between staple compared with suture skin closure (28 [33%] compared with 25 [32%], relative risk 1.05, 95% confidence interval [CI] 0.68-1.64). Women with staples reported worse median cosmetic scores (four of five compared with five of five, P<.001), darker scar color (37 [49%] compared with 13 [18%], relative risk 2.69, 95% CI 1.57-4.63), and more skin marks (30 [40%] compared with three [4%], relative risk 9.47, 95% CI 3.02-29.65) compared with women with suture closure. There was no group difference regarding satisfaction with their scar. Stepwise multivariate analysis revealed BMI (odds ratio [OR] 1.13, 95% CI 1.07-1.20), maximum postoperative glucose (OR 1.01, 95% CI 1.00-1.01), and cigarette smoking (OR 4.96, 95% CI 1.32-18.71) were correlates of wound complication. Closure of midline vertical skin incisions with subcuticular suture does not reduce surgical site wound complications compared with staples in obese gynecology patients. ClinicalTrials.gov, NCT01977612.
Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, David M.; Edge, Helen
2013-07-01
The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determinationmore » from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)« less
Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
Landlord project multi-year program plan, fiscal year 1999, WBS 1.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dallas, M.D.
The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less
[Percutaneous closure of atrial septal defects with the Amplatzer® device: 15 years of experience].
Zabal-Cerdeira, Carlos; García-Montes, José Antonio; Sandoval-Jones, Juan Pablo; Calderón-Colmenero, Juan; Patiño-Bahena, Emilia; Juanico-Enríquez, Antonio; Buendía-Hernández, Alfonso
2014-01-01
Percutaneous closure of atrial septal defects is an alternative to surgical treatment. We report the results of percutaneous closure of atrial septal defects with the Amplatzer(®) device. We include patients taken to the catheterization laboratory from September 1997 to December 2011. We proceeded with defect closure in 721 patients and in 85 the defect was considered not suitable for closure. The stretched diameter of the defect was 23±6.7mm (limits, 5-42). All devices were positioned successfully. In 15 cases (2.1%) the device was changed due to instability and in 6 (0.8%) the device embolized within the first 24h, 4 were retrieved and repositioned (final success with intention to treat 719/806-89.2%). Immediate control showed complete closure in 247 patients (34.3%), leak through the device in 395 (54.9%), mild residual leak in 75 (10.4%) and moderate in 2 (0.3%). We have follow-up in 626 patients (87.1%) for 33±27.5 months, with headache in 54 (8.6%), new supraventricular arrhythmia in 10 (1.6%), puncture site complications in 4 (0.6%), and stroke in one (0.1%). The design of the Amplatzer(®) device allows effective closure of atrial septal defects with a simple technique and patient safety. Copyright © 2013 Instituto Nacional de Cardiología Ignacio Chávez. Published by Masson Doyma México S.A. All rights reserved.
[A Contrivance for Closure and Dressing of Orocutaneous Fistula Developed in Advanced Oral Cancer].
Nariai, Yoshiki; Akutsu, Junichi; Okuma, Satoe; Odawara, Sho; Kanno, Takahiro; Sekine, Joji
2017-11-01
Orocutaneous fistula sometimes occurs in locallyadvanced unresectable or recurrent oral squamous cell carcinoma. The developed orocutaneous fistula results in constant leakage of saliva, ingested foods and liquids and decline in patients' quality of life(QOL). A 47-year-old Japanese man had received treatment for tongue carcinoma. At the routine follow-up, a cystic lesion in the right submandibular region was detected. Biopsyof the specimen of the cystic lesion revealed squamous cell carcinoma. After chemotherapy, an orocutaneous fistula between the right oropharyngeal and the right submandibular region developed and graduallyincreased. Although closure and dressing of the orocutaneous fistula with various materials was attempted, it was ultimatelyunsuccessful. Finally, application of a rubber film and silicone adhesive agent to the skin was successful for closure and dressing of the fistula. Orocutaneous fistula is one of major contributors to decline in patients' QOL. The sharing of information regarding effective methods or materials for closure and dressing of orocutaneous fistula is necessaryto maintain patients' QOL.
ERIC Educational Resources Information Center
Hisle, W. Lee; And Others
Designed by Austin Community College's (ACC's) Learning Resource Services (LRS) Management Team, this plan explores the development of the LRS in preparation for the 1989 closure of the college's Ridgeview (RDV) campus, and the opening of the Northridge (NRG) and Riverside (RVS) campuses. First, the plan's executive summary lays out…
Güvenç, Osman; Saygı, Murat; Demir, İbrahim Halil; Ödemiş, Ender
2017-06-01
Patients with wide patent ductus arteriosus and significant pulmonary hypertension not treated in time constitute a significant problem for cardiologists. For these patients, tests that could aid in decision-making for further planning include reversibility and balloon occlusion tests performed in the catheterization laboratory. Devices developed for the closure of ductus as well as different devices with off-label use may be employed in patients scheduled for transcatheter occlusion. When result of reversibility test is borderline positive, the use of fenestrated device may be applicable for selected patients. Presently described is case of a 10-year-old patient with Down syndrome who had a wide ductus and systemic pulmonary hypertension. Transcatheter closure procedure was performed with off-label use of a fenestrated muscular ventricular septal defect occluder device.
Influence of glottal closure on the phonatory process in ex vivo porcine larynges.
Birk, Veronika; Kniesburges, Stefan; Semmler, Marion; Berry, David A; Bohr, Christopher; Döllinger, Michael; Schützenberger, Anne
2017-10-01
Many cases of disturbed voice signals can be attributed to incomplete glottal closure, vocal fold oscillation asymmetries, and aperiodicity. Often these phenomena occur simultaneously and interact with each other, making a systematic, isolated investigation challenging. Therefore, ex vivo porcine experiments were performed which enable direct control of glottal configurations. Different pre-phonatory glottal gap sizes, adduction levels, and flow rates were adjusted. The resulting glottal closure types were identified in a post-processing step. Finally, the acoustic quality, aerodynamic parameters, and the characteristics of vocal fold oscillation were analyzed in reference to the glottal closure types. Results show that complete glottal closure stabilizes the phonation process indicated through a reduced left-right phase asymmetry, increased amplitude and time periodicity, and an increase in the acoustic quality. Although asymmetry and periodicity parameter variation covers only a small range of absolute values, these small variations have a remarkable influence on the acoustic quality. Due to the fact that these parameters cannot be influenced directly, the authors suggest that the (surgical) reduction of the glottal gap seems to be a promising method to stabilize the phonatory process, which has to be confirmed in future studies.
Boyd, Matt; Baker, Michael G; Mansoor, Osman D; Kvizhinadze, Giorgi; Wilson, Nick
2017-01-01
Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, "Scenario A"), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of "Scenario A", or 2.75% of the country's population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for "Scenario A" times three for 26 weeks of border closure-but not for only 12 weeks of closure when it would still be beneficial). This "proof-of-concept" work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective.
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below themore » Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.« less
Wine oxidation and the role of cork.
Karbowiak, Thomas; Gougeon, Régis D; Alinc, Jean-Baptiste; Brachais, Laurent; Debeaufort, Frédéric; Voilley, Andrée; Chassagne, David
2010-01-01
The present review aims to show the state of the art of oxidation mechanisms occurring especially in white wines by taking into account knowledge from different fields in relation to the subject. It is therefore divided into three main parts. First, the mechanisms of oxidation relevant to white wine are discussed in the light of recent scientific literature. Next, the phenomenon of oxygen solubility in wine during the winemaking process, and in particular during bottling is stated theoretically as well as practically. Finally, the aspect of wine conservation after bottling is examined with respect to mass transfers which may occur through the closure, with a special emphasis on cork. Currently, specific physico-chemical properties still make cork closures the most important closure type used for the wine market, and especially for high quality wines. This final section will also include a review of studies performed on this subject, which have been analyzed in detail from a theoretical mass transfer point of view, in order to assess the extent to which the proposed scientific tools and the observed tendencies are relevant to progress in the understanding of the impact of this parameter on the behavior of a wine.
Jam proof closure assembly for lidded pressure vessels
Cioletti, Olisse C.
1992-01-01
An expendable closure assembly is provided for use (in multiple units) with a lockable pressure vessel cover along its rim, such as of an autoclave. This assembly is suited to variable compressive contact and locking with the vessel lid sealing gasket. The closure assembly consists of a thick walled sleeve insert for retention in the under bores fabricated in the cover periphery and the sleeve is provided with internal threading only. A snap serves as a retainer on the underside of the sleeve, locking it into an under bore retention channel. Finally, a standard elongate externally threaded bolt is sized for mating cooperation with the so positioned sleeve, whereby the location of the bolt shaft in the cover bore hole determines its compressive contact on the underlying gasket.
Barlow, Andrew; Klima, Matej; Shashkov, Mikhail
2018-04-02
In hydrocodes, voids are used to represent vacuum and model free boundaries between vacuum and real materials. We give a systematic description of a new treatment of void closure in the framework of the multimaterial arbitrary Lagrangian–Eulerian (ALE) methods. This includes a new formulation of the interface-aware sub-scale-dynamics (IA-SSD) closure model for multimaterial cells with voids, which is used in the Lagrangian stage of our indirect ALE scheme. The results of the comprehensive testing of the new model are presented for one- and two-dimensional multimaterial calculations in the presence of voids. Finally, we also present a sneak peek of amore » realistic shaped charge calculation in the presence of voids and solids.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barlow, Andrew; Klima, Matej; Shashkov, Mikhail
In hydrocodes, voids are used to represent vacuum and model free boundaries between vacuum and real materials. We give a systematic description of a new treatment of void closure in the framework of the multimaterial arbitrary Lagrangian–Eulerian (ALE) methods. This includes a new formulation of the interface-aware sub-scale-dynamics (IA-SSD) closure model for multimaterial cells with voids, which is used in the Lagrangian stage of our indirect ALE scheme. The results of the comprehensive testing of the new model are presented for one- and two-dimensional multimaterial calculations in the presence of voids. Finally, we also present a sneak peek of amore » realistic shaped charge calculation in the presence of voids and solids.« less
Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shannon Parsons
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less
National Wind Tunnel Complex (NWTC)
NASA Technical Reports Server (NTRS)
1996-01-01
The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.
NIMROD Modeling of Sawtooth Modes Using Hot-Particle Closures
NASA Astrophysics Data System (ADS)
Kruger, Scott; Jenkins, T. G.; Held, E. D.; King, J. R.
2015-11-01
In DIII-D shot 96043, RF heating gives rise to an energetic ion population that alters the sawtooth stability boundary, replacing conventional sawtooth cycles by longer-period, larger-amplitude `giant sawtooth' oscillations. We explore the use of particle-in-cell closures within the NIMROD code to numerically represent the RF-induced hot-particle distribution, and investigate the role of this distribution in determining the altered mode onset threshold and subsequent nonlinear evolution. Equilibrium reconstructions from the experimental data are used to enable these detailed validation studies. Effects of other parameters on the sawtooth behavior, such as the plasma Lundquist number and hot-particle beta-fraction, are also considered. The fast energetic particles present many challenges for the PIC closure. We review new algorithm and performance improvements to address these challenges, and provide a preliminary assessment of the efficacy of the PIC closure versus a continuum model for energetic particle modeling. We also compare our results with those of, and discuss plans for a more complete validation campaign for this discharge. Supported by US Department of Energy via the SciDAC Center for Extended MHD Modeling (CEMM).
Bhatla, Puneet; Tretter, Justin T; Ludomirsky, Achi; Argilla, Michael; Latson, Larry A; Chakravarti, Sujata; Barker, Piers C; Yoo, Shi-Joon; McElhinney, Doff B; Wake, Nicole; Mosca, Ralph S
2017-01-01
Rapid prototyping facilitates comprehension of complex cardiac anatomy. However, determining when this additional information proves instrumental in patient management remains a challenge. We describe our experience with patient-specific anatomic models created using rapid prototyping from various imaging modalities, suggesting their utility in surgical and interventional planning in congenital heart disease (CHD). Virtual and physical 3-dimensional (3D) models were generated from CT or MRI data, using commercially available software for patients with complex muscular ventricular septal defects (CMVSD) and double-outlet right ventricle (DORV). Six patients with complex anatomy and uncertainty of the optimal management strategy were included in this study. The models were subsequently used to guide management decisions, and the outcomes reviewed. 3D models clearly demonstrated the complex intra-cardiac anatomy in all six patients and were utilized to guide management decisions. In the three patients with CMVSD, one underwent successful endovascular device closure following a prior failed attempt at transcatheter closure, and the other two underwent successful primary surgical closure with the aid of 3D models. In all three cases of DORV, the models provided better anatomic delineation and additional information that altered or confirmed the surgical plan. Patient-specific 3D heart models show promise in accurately defining intra-cardiac anatomy in CHD, specifically CMVSD and DORV. We believe these models improve understanding of the complex anatomical spatial relationships in these defects and provide additional insight for pre/intra-interventional management and surgical planning.
High-performance space shuttle auxiliary propellant valve system
NASA Technical Reports Server (NTRS)
Smith, G. M.
1973-01-01
Several potential valve closures for the space shuttle auxiliary propulsion system (SS/APS) were investigated analytically and experimentally in a modeling program. The most promising of these were analyzed and experimentally evaluated in a full-size functional valve test fixture of novel design. The engineering investigations conducted for both model and scale evaluations of the SS/APS valve closures and functional valve fixture are described. Preliminary designs, laboratory tests, and overall valve test fixture designs are presented, and a final recommended flightweight SS/APS valve design is presented.
Percutaneous closure of a large ascending aortic pseudoaneurysm.
Nogueira, Marta Afonso; Fiarresga, António; de Sousa, Lídia; Galrinho, Ana; Santos, Ninel; Nobre, Isabel; Laranjeira, Álvaro; Cruz Ferreira, Rui
2016-02-01
Pseudoaneurysm of the ascending aorta is a rare complication, usually after thoracic surgery or trauma. Since surgical repair is associated with very high morbidity and mortality, percutaneous closure has been described as an alternative. In this regard, we present a case in which a symptomatic large pseudoaneurysm of the ascending aorta was treated percutaneously due to the high surgical risk. Despite the technical difficulties, this procedure had a good final result followed by clinical success. Copyright © 2016 Sociedade Portuguesa de Cardiologia. Published by Elsevier España. All rights reserved.
Assessment and application of Reynolds stress closure models to high-speed compressible flows
NASA Technical Reports Server (NTRS)
Gatski, T. B.; Sarkar, S.; Speziale, C. G.; Balakrishnan, L.; Abid, R.; Anderson, E. C.
1990-01-01
The paper presents results from the development of higher order closure models for the phenomological modeling of high-speed compressible flows. The work presented includes the introduction of an improved pressure-strain correlationi model applicable in both the low- and high-speed regime as well as modifications to the isotropic dissipation rate to account for dilatational effects. Finally, the question of stiffness commonly associated with the solution of two-equation and Reynolds stress transport equations in wall-bounded flows is examined and ways of relaxing these restrictions are discussed.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES REVITALIZING BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT... Response, Compensation, and Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pieper, Claus Christian, E-mail: claus.christian.pieper@ukb.uni-bonn.de; Thomas, Daniel, E-mail: daniel.thomas@ukb.uni-bonn.de; Nadal, Jennifer, E-mail: jennifer.nadal@ukb.uni-bonn.de
PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal{sup ®} vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal{sup ®}-VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)].more » Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal{sup ®}-VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal{sup ®} use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general.« less
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
Final closure of the Panamaian Isthmus and the onset of northern hemisphere glaciation
NASA Astrophysics Data System (ADS)
Sarnthein, M.; Bartoli, G.; Weinelt, M.; Erlenkeuser, H.; Garbe-Schoenberg, D.; Lea, D. W.
2005-12-01
The Greenland ice sheet forms a key factor controlling the Quaternary-style glacial scenario. However, origin and mechanisms of major Arctic glaciation starting at 3.15 Ma and culminating at 2.74 Ma have remained controversial. For this phase of intense cooling Ravelo et al. (2004) proposed a complex gradual forcing mechanism. In contrast, our new submillennial-scale paleoceanographic records from the Pliocene North Atlantic suggest a far more precise timing and forcing for the initiation of northern hemisphere glaciation (NHG), since it was linked to a 2-3 /degC surface water warming during warm stages from 2.95 to 2.82 Ma (until glacial stage G10). These records support previous models (Haug and Tiedemann, 1998) claiming that the final closure of the Panama Isthmus (3.0 - ~2.5 Ma; Groeneveld, 2005) induced an increased poleward salt and heat transport. Associated strengthening of North Atlantic thermohaline circulation and in turn, an intensified moisture supply to northern high latitudes resulted in the build-up of NHG, finally culminating in the great, irreversible climate crash at glacial stage G6 (2.74 Ma). In summary, we see a two-step threshold mechanism that marked the onset of NHG with glacial-to-interglacial cycles quasi-persistent until today. G r o e n e v e l d, J., The final closure of the Central American Seaway. PhD Thesis Kiel, 2005. H a u g, G. and T i e d e m a n n , R., 1 9 9 8. Nature 393, 676-678. R a v e l o , A.C., e t a l ., 2004. Nature 429, 263-267.
Starting at the End When Planning for Base Closure
2016-05-17
order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was
Why do nursing homes close? An analysis of newspaper articles.
Fisher, Andrew; Castle, Nicholas
2012-01-01
Using Non-numerical Unstructured Data Indexing Searching and Theorizing (NUD'IST) software to extract and examine keywords from text, the authors explored the phenomenon of nursing home closure through an analysis of 30 major-market newspapers over a period of 66 months (January 1, 1999 to June 1, 2005). Newspaper articles typically represent a careful analysis of staff impressions via interviews, managerial perspectives, and financial records review. There is a current reliance on the synthesis of information from large regulatory databases such as the Online Survey Certification And Reporting database, the California Office of Statewide Healthcare Planning and Development database, and Area Resource Files. Although such databases permit the construction of studies capable of revealing some reasons for nursing home closure, they are hampered by the confines of the data entered. Using our analysis of newspaper articles, the authors are able to add further to their understanding of nursing home closures.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils and from graphic arts operations and the provision of sampling and testing facilities...; SDCAPCD Rule 67.16, Metal Container, Graphic Arts Operations; MBUAPCD Rule 205, Provision of Sampling and...
Fort Ord Redevelopment: Coordinating Transportation and Land Use Planning
DOT National Transportation Integrated Search
1999-01-01
The closure of military bases and conversion to civilian land uses is a challenging task faced by many small communities throughout the nation. Fort Ord is located in Monterey County, California and encompasses 28,000 acres of reprogrammed property. ...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
49 CFR 178.338-16 - Inspection and testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... all such residue and cleaning solution must be removed from the tank prior to final closure of the... heat-treated, if such heat treatment was previously performed, and the repaired areas must be retested...
Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less
Johnson, Oliver K.; Kurniawan, Christian
2018-02-03
Properties closures delineate the theoretical objective space for materials design problems, allowing designers to make informed trade-offs between competing constraints and target properties. In this paper, we present a new algorithm called hierarchical simplex sampling (HSS) that approximates properties closures more efficiently and faithfully than traditional optimization based approaches. By construction, HSS generates samples of microstructure statistics that span the corresponding microstructure hull. As a result, we also find that HSS can be coupled with synthetic polycrystal generation software to generate diverse sets of microstructures for subsequent mesoscale simulations. Finally, by more broadly sampling the space of possible microstructures, itmore » is anticipated that such diverse microstructure sets will expand our understanding of the influence of microstructure on macroscale effective properties and inform the construction of higher-fidelity mesoscale structure-property models.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Oliver K.; Kurniawan, Christian
Properties closures delineate the theoretical objective space for materials design problems, allowing designers to make informed trade-offs between competing constraints and target properties. In this paper, we present a new algorithm called hierarchical simplex sampling (HSS) that approximates properties closures more efficiently and faithfully than traditional optimization based approaches. By construction, HSS generates samples of microstructure statistics that span the corresponding microstructure hull. As a result, we also find that HSS can be coupled with synthetic polycrystal generation software to generate diverse sets of microstructures for subsequent mesoscale simulations. Finally, by more broadly sampling the space of possible microstructures, itmore » is anticipated that such diverse microstructure sets will expand our understanding of the influence of microstructure on macroscale effective properties and inform the construction of higher-fidelity mesoscale structure-property models.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freeman-Pollard, J.R.
1994-03-02
This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ridge, A. Christianne; Barr, Cynthia S.; Pinkston, Karen E.
Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms,more » and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)« less
NASA Astrophysics Data System (ADS)
Bronstein, Leo; Koeppl, Heinz
2018-01-01
Approximate solutions of the chemical master equation and the chemical Fokker-Planck equation are an important tool in the analysis of biomolecular reaction networks. Previous studies have highlighted a number of problems with the moment-closure approach used to obtain such approximations, calling it an ad hoc method. In this article, we give a new variational derivation of moment-closure equations which provides us with an intuitive understanding of their properties and failure modes and allows us to correct some of these problems. We use mixtures of product-Poisson distributions to obtain a flexible parametric family which solves the commonly observed problem of divergences at low system sizes. We also extend the recently introduced entropic matching approach to arbitrary ansatz distributions and Markov processes, demonstrating that it is a special case of variational moment closure. This provides us with a particularly principled approximation method. Finally, we extend the above approaches to cover the approximation of multi-time joint distributions, resulting in a viable alternative to process-level approximations which are often intractable.
Neural tube closure depends on expression of Grainyhead-like 3 in multiple tissues.
De Castro, Sandra C P; Hirst, Caroline S; Savery, Dawn; Rolo, Ana; Lickert, Heiko; Andersen, Bogi; Copp, Andrew J; Greene, Nicholas D E
2018-03-15
Failure of neural tube closure leads to neural tube defects (NTDs), common congenital abnormalities in humans. Among the genes whose loss of function causes NTDs in mice, Grainyhead-like3 (Grhl3) is essential for spinal neural tube closure, with null mutants exhibiting fully penetrant spina bifida. During spinal neurulation Grhl3 is initially expressed in the surface (non-neural) ectoderm, subsequently in the neuroepithelial component of the neural folds and at the node-streak border, and finally in the hindgut endoderm. Here, we show that endoderm-specific knockout of Grhl3 causes late-arising spinal NTDs, preceded by increased ventral curvature of the caudal region which was shown previously to suppress closure of the spinal neural folds. This finding supports the hypothesis that diminished Grhl3 expression in the hindgut is the cause of spinal NTDs in the curly tail, carrying a hypomorphic Grhl3 allele. Complete loss of Grhl3 function produces a more severe phenotype in which closure fails earlier in neurulation, before the stage of onset of expression in the hindgut of wild-type embryos. This implicates additional tissues and NTD mechanisms in Grhl3 null embryos. Conditional knockout of Grhl3 in the neural plate and node-streak border has minimal effect on closure, suggesting that abnormal function of surface ectoderm, where Grhl3 transcripts are first detected, is primarily responsible for early failure of spinal neurulation in Grhl3 null embryos. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.
Geospatial Thinking of Information Professionals
ERIC Educational Resources Information Center
Bishop, Bradley Wade; Johnston, Melissa P.
2013-01-01
Geospatial thinking skills inform a host of library decisions including planning and managing facilities, analyzing service area populations, facility site location, library outlet and service point closures, as well as assisting users with their own geospatial needs. Geospatial thinking includes spatial cognition, spatial reasoning, and knowledge…
Crash analysis of I-64 closure in St. Louis county.
DOT National Transportation Integrated Search
2011-08-01
On January 2, 2008, the Missouri Department of Transportation (MoDOT) closed significant portions of Missouri Interstate 64 : (I-64) in St. Louis County for reconstruction. During the planning stages of this project, the proposal to close all lanes o...
Service in the snow. Maintaining care in rural California.
Elliott, P
1993-08-01
The amount of snow that falls in the Sierras is proof that all is not sunshine in rural northeastern California. Isolation and road closures were just two of the challenges that one home care agency was able to surmount with careful planning.
75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...
The new I-64 economic and regional mobility study.
DOT National Transportation Integrated Search
2011-11-01
The Final Report summarizes the 2008 and 2009 Annual Reports of all studys activities conducted during the I-64 Full-closure construction project in the St. Louis, Missouri region. These activities included project communications, public opinions,...
Efficiently enforcing artisanal fisheries to protect estuarine biodiversity.
Duarte de Paula Costa, Micheli; Mills, Morena; Richardson, Anthony J; Fuller, Richard A; Muelbert, José H; Possingham, Hugh P
2018-06-26
Artisanal fisheries support millions of livelihoods worldwide, yet ineffective enforcement can allow for continued environmental degradation due to overexploitation. Here, we use spatial planning to design an enforcement strategy for a pre-existing spatial closure for artisanal fisheries considering climate variability, existing seasonal fishing closures, representative conservation targets and enforcement costs. We calculated enforcement cost in three ways, based on different assumptions about who could be responsible for monitoring the fishery. We applied this approach in the Patos Lagoon estuary (Brazil), where we found three important results. First, spatial priorities for enforcement were similar under different climate scenarios. Second, we found that the cost and percentage of area enforced varied among scenarios tested by the conservation planning analysis, with only a modest increase in budget needed to incorporate climate variability. Third, we found that spatial priorities for enforcement depend on whether enforcement is carried out by a central authority or by the community itself. Here, we demonstrated a method that can be used to efficiently design enforcement plans, resulting in the conservation of biodiversity and estuarine resources. Also, cost of enforcement can be potentially reduced when fishers are empowered to enforce management within their fishing grounds. © 2018 by the Ecological Society of America.
Sharma, Mohit; Wakure, Abhijeet
2013-01-01
Most surgical patients end up with a scar and most of these would want at least some improvement in the appearance of the scar. Using sound techniques for wound closure surgeons can, to a certain extent, prevent suboptimal scars. This article reviews the principles of prevention and treatment of suboptimal scars. Surgical techniques of scar revision, i.e., Z plasty, W plasty, and geometrical broken line closure are described. Post-operative care and other adjuvant therapies of scars are described. A short description of dermabrasion and lasers for management of scars is given. It is hoped that this review helps the surgeon to formulate a comprehensive plan for management of scars of these patients. PMID:24516292
Innexin 3, a New Gene Required for Dorsal Closure in Drosophila Embryo
Giuliani, Fabrizio; Giuliani, Giuliano; Bauer, Reinhard; Rabouille, Catherine
2013-01-01
Background Dorsal closure is a morphogenetic event that occurs during mid-embryogenesis in many insects including Drosophila, during which the ectoderm migrates on the extraembryonic amnioserosa to seal the embryo dorsally. The contribution of the ectoderm in this event has been known for a long time. However, amnioserosa tension and contractibility have recently been shown also to be instrumental to the closure. A critical pre-requisite for dorsal closure is integrity of these tissues that in part is mediated by cell-cell junctions and cell adhesion. In this regard, mutations impairing junction formation and/or adhesion lead to dorsal closure. However, no role for the gap junction proteins Innexins has so far been described. Results and Discussion Here, we show that Innexin 1, 2 and 3, are present in the ectoderm but also in the amnioserosa in plaques consistent with gap junctions. However, only the loss of Inx3 leads to dorsal closure defects that are completely rescued by overexpression of inx3::GFP in the whole embryo. Loss of Inx3 leads to the destabilisation of Inx1, Inx2 and DE-cadherin at the plasma membrane, suggesting that these four proteins form a complex. Accordingly, in addition to the known interaction of Inx2 with DE-cadherin, we show that Inx3 can bind to DE-cadherin. Furthermore, Inx3-GFP overexpression recruits DE-cadherin from its wildtype plasma membrane domain to typical Innexin plaques, strengthening the notion that they form a complex. Finally, we show that Inx3 stability is directly dependent on tissue tension. Taken together, we propose that Inx3 is a critical factor for dorsal closure and that it mediates the stability of Inx1, 2 and DE-cadherin by forming a complex. PMID:23894431
NASA Astrophysics Data System (ADS)
Cowgill, E.; Forte, A. M.; Niemi, N. A.; Avdeev, B.; Tye, A. R.; Trexler, C. C.; Javakhishvili, Z.; Elashvili, M.; Godoladze, T.
2016-12-01
Comparison of plate convergence with the timing and magnitude of upper-crustal shortening in collisional orogens indicates both shortening deficits (200-1700 km) and significant (30-40%) plate deceleration during collision, the cause(s) for which remain debated. The Greater Caucasus Mountains, which result from post-collisional Cenozoic closure of a relict Mesozoic back-arc basin on the northern margin of the Arabia-Eurasia collision zone, help reconcile these debates. Here we use U-Pb detrital zircon provenance data and the regional geology of the Caucasus to investigate the width of the now-consumed Mesozoic back-arc basin and its closure history. The provenance data record distinct southern and northern provenance domains that persisted until at least the Miocene; maximum basin width was likely 350-400 km. We propose that closure of the back-arc basin initiated at 35 Ma, coincident with initial (soft) Arabia-Eurasia collision along the Bitlis suture, eventually leading to 5 Ma (hard) collision between the Lesser Caucasus arc and the Scythian platform to form the Greater Caucasus Mountains. Final basin closure triggered deceleration of plate convergence and tectonic reorganization throughout the collision. Post-collisional subduction of such small (500-1000 km wide) relict ocean basins can account for both shortening deficits and delays in plate deceleration by accommodating convergence via subduction/underthrusting, although such shortening is easily missed if it occurs along structures hidden within flysch/slate belts. Relict-basin closure is likely typical early in continental collision at the end of a Wilson cycle due to the irregularity of colliding margins and extensive back-arc basin development during closure of long-lived ocean basins.
Mathaes, Roman; Mahler, Hanns-Christian; Roggo, Yves; Huwyler, Joerg; Eder, Juergen; Fritsch, Kamila; Posset, Tobias; Mohl, Silke; Streubel, Alexander
2016-01-01
Capping equipment used in good manufacturing practice manufacturing features different designs and a variety of adjustable process parameters. The overall capping result is a complex interplay of the different capping process parameters and is insufficiently described in literature. It remains poorly studied how the different capping equipment designs and capping equipment process parameters (e.g., pre-compression force, capping plate height, turntable rotating speed) contribute to the final residual seal force of a sealed container closure system and its relation to container closure integrity and other drug product quality parameters. Stopper compression measured by computer tomography correlated to residual seal force measurements.In our studies, we used different container closure system configurations from different good manufacturing practice drug product fill & finish facilities to investigate the influence of differences in primary packaging, that is, vial size and rubber stopper design on the capping process and the capped drug product. In addition, we compared two large-scale good manufacturing practice manufacturing capping equipment and different capping equipment settings and their impact on product quality and integrity, as determined by residual seal force.The capping plate to plunger distance had a major influence on the obtained residual seal force values of a sealed vial, whereas the capping pre-compression force and the turntable rotation speed showed only a minor influence on the residual seal force of a sealed vial. Capping process parameters could not easily be transferred from capping equipment of different manufacturers. However, the residual seal force tester did provide a valuable tool to compare capping performance of different capping equipment. No vial showed any leakage greater than 10(-8)mbar L/s as measured by a helium mass spectrometry system, suggesting that container closure integrity was warranted in the residual seal force range tested for the tested container closure systems. Capping equipment used in good manufacturing practice manufacturing features different designs and a variety of adjustable process parameters. The overall capping result is a complex interplay of the different capping process parameters and is insufficiently described in the literature. It remains poorly studied how the different capping equipment designs and capping equipment process parameters contribute to the final capping result.In this study, we used different container closure system configurations from different good manufacturing process drug product fill & finish facilities to investigate the influence of the vial size and the rubber stopper design on the capping process. In addition, we compared two examples of large-scale good manufacturing process capping equipment and different capping equipment settings and their impact on product quality and integrity, as determined by residual seal force. © PDA, Inc. 2016.
Tschopp, J M; Evéquoz, D; Karrer, W; Aymon, E; Naef, A P
1990-03-01
We report a case of chronic debilitating BPF following right upper lobe resection. Despite several endobronchial applications of fibrin glue, we could not close it. Since the patient was extremely debilitated by symptoms due to the BPF, a thoracoplasty was attempted but was not successful. Finally, the BPF was definitely closed by instillation of talc into the pleura through thoracoscopy. To our knowledge, this is the first reported case of chemical closure of a recalcitrant BPF by the route of thoracoscopy. It also shows the failure of endoscopic fibrin glue application in such a condition.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-04
...NMFS implements an accountability measure (AM) for recreational gray triggerfish in the Gulf of Mexico (Gulf) reef fish fishery for the 2013 fishing year through this temporary final rule. Based on the projected recreational landings, NMFS determined that the recreational annual catch target (ACT) for Gulf gray triggerfish was reached in August 2013. Therefore, NMFS closes the recreational sector for gray triggerfish in the Gulf EEZ at 12:01 a.m., local time, October 15, 2013, until January 1, 2014. This closure is necessary to reduce overfishing of the Gulf gray triggerfish resource.
A numerical and experimental study of confined swirling jets
NASA Technical Reports Server (NTRS)
Nikjooy, M.; Mongia, H. C.; Samuelsen, G. S.; Mcdonell, V. G.
1989-01-01
A numerical and experimental study of a confined strong swirling flow is presented. Detailed velocity measurements are made using a two-component laser Doppler velocimeter (LDV) technique. Computations are performed using a differential second-moment (DSM) closure. The effect of inlet dissipation rate on calculated mean and turbulence fields is investigated. Various model constants are employed in the pressure-strain model to demonstrate their influences on the predicted results. Finally, comparison of the DSM calculations with the algebraic second-monent (ASM) closure results shows that the DSM is better suited for complex swirling flow analysis.
Minimizing user delay and crash potential through highway work zone planning.
DOT National Transportation Integrated Search
2014-05-01
Lane closures due to highway work zones introduce many challenges to ensuring smooth traffic operations and a : safe environment for drivers and workers. In addition, merging has been found to be one of the most stressful : aspects of driving and a m...
Governing Underfunded Tribal Colleges.
ERIC Educational Resources Information Center
Ambler, Marjane
1996-01-01
Discusses tribal colleges' struggles with lower-than-promised federal appropriations, including difficulties related to governance and planning and the threat of closure. Describes possible alternate means of funding, such as forward funding one year in advance, funding from state governments, and private funding from tribal governments or private…
Hamiltonian fluid closures of the Vlasov-Ampère equations: From water-bags to N moment models
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perin, M.; Chandre, C.; Tassi, E.
2015-09-15
Moment closures of the Vlasov-Ampère system, whereby higher moments are represented as functions of lower moments with the constraint that the resulting fluid system remains Hamiltonian, are investigated by using water-bag theory. The link between the water-bag formalism and fluid models that involve density, fluid velocity, pressure and higher moments is established by introducing suitable thermodynamic variables. The cases of one, two, and three water-bags are treated and their Hamiltonian structures are provided. In each case, we give the associated fluid closures and we discuss their Casimir invariants. We show how the method can be extended to an arbitrary numbermore » of fields, i.e., an arbitrary number of water-bags and associated moments. The thermodynamic interpretation of the resulting models is discussed. Finally, a general procedure to derive Hamiltonian N-field fluid models is proposed.« less
Gravity affects the closure of the traps in Dionaea muscipula.
Pandolfi, Camilla; Masi, Elisa; Voigt, Boris; Mugnai, Sergio; Volkmann, Dieter; Mancuso, Stefano
2014-01-01
Venus flytrap (Dionaea muscipula Ellis) is a carnivorous plant known for its ability to capture insects thanks to the fast snapping of its traps. This fast movement has been long studied and it is triggered by the mechanical stimulation of hairs, located in the middle of the leaves. Here we present detailed experiments on the effect of microgravity on trap closure recorded for the first time during a parabolic flight campaign. Our results suggest that gravity has an impact on trap responsiveness and on the kinetics of trap closure. The possible role of the alterations of membrane permeability induced by microgravity on trap movement is discussed. Finally we show how the Venus flytrap could be an easy and effective model plant to perform studies on ion channels and aquaporin activities, as well as on electrical activity in vivo on board of parabolic flights and large diameter centrifuges.
Gap geometry dictates epithelial closure efficiency
Ravasio, Andrea; Cheddadi, Ibrahim; Chen, Tianchi; Pereira, Telmo; Ong, Hui Ting; Bertocchi, Cristina; Brugues, Agusti; Jacinto, Antonio; Kabla, Alexandre J.; Toyama, Yusuke; Trepat, Xavier; Gov, Nir; Neves de Almeida, Luís; Ladoux, Benoit
2015-01-01
Closure of wounds and gaps in tissues is fundamental for the correct development and physiology of multicellular organisms and, when misregulated, may lead to inflammation and tumorigenesis. To re-establish tissue integrity, epithelial cells exhibit coordinated motion into the void by active crawling on the substrate and by constricting a supracellular actomyosin cable. Coexistence of these two mechanisms strongly depends on the environment. However, the nature of their coupling remains elusive because of the complexity of the overall process. Here we demonstrate that epithelial gap geometry in both in vitro and in vivo regulates these collective mechanisms. In addition, the mechanical coupling between actomyosin cable contraction and cell crawling acts as a large-scale regulator to control the dynamics of gap closure. Finally, our computational modelling clarifies the respective roles of the two mechanisms during this process, providing a robust and universal mechanism to explain how epithelial tissues restore their integrity. PMID:26158873
A regenerative approach towards mucosal fenestration closure
Gandi, Padma; Anumala, Naveen; Reddy, Amarender; Viswa Chandra, Rampalli
2013-01-01
Mucosal fenestration is an opening or an interstice through the oral mucosa. A lesion which occurs with greater frequency than generally realised, its occurrence is attributed to a myriad of causes. Mucogingival procedures including connective tissue grafts, free gingival grafts and lateral pedicle grafts are generally considered to be the treatment of choice in the closure of a mucosal fenestration. More often, these procedures are performed in conjunction with other procedures such as periradicular surgery and with bone grafts. However, the concomitant use of gingival grafts and bone grafts in mucosal fenestrations secondary to infections in sites exhibiting severe bone loss is highly debatable. In this article, we report two cases of mucosal fenestrations secondary to trauma and their management by regenerative periodontal surgery with the placement of guided tissue regeneration membrane and bone graft. The final outcome was a complete closure of the fenestration in both the cases. PMID:23749826
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... determination. See Certain Magnesia Carbon Bricks From the People's Republic of China: Preliminary Negative... circumstances included the Department's partial or full closure during the five-day period after the CVD...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
2002-11-12
This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willoughby III, O.H.; Lukes, G.C.
EnergySolutions, LLC operates its Mixed Waste Facility at Clive, Utah under the provisions of its State-issued Part B Permit. The facility accepts waste that contains both hazardous and radioactive contaminants. Utah is an EPA Agreement State and therefore the Utah Division of Solid and Hazardous Waste (DSHW) is authorized to regulate the hazardous waste operations at the facility. The radioactive portion of the waste is regulated by the Utah Division of Radiation Control. 40 CFR 264.142 outlines the facility requirements for Closure Costs. The owner or operator must have a detailed written estimate of the cost of closing the facilitymore » in accordance with the rules. For many years the State of Utah had relied on the facility's estimate of closure costs as the amount that needed to be funded. This amount is reviewed annually and adjusted for inflation and for changes at the facility. In 2004 the agency and the facility requested bids from independent contractors to provide their estimate for closure costs. Three engineering firms bid on the project. The facility funded the project and both the agency and the facility chose one of the firms to provide an independent estimate. The engineering firms met with both parties and toured the facility. They were also provided with the current closure cost line items. Each firm provided an estimated cost for closure of the facility at the point in the facility's active life that would make the closure most expensive. Included with the direct costs were indirect line items such as overhead, profit, mobilization, hazardous working conditions and regulatory oversight. The agency and the facility reviewed the independent estimates and negotiated a final Closure and Post-Closure Cost Estimate for the Mixed Waste Facility. There are several mechanisms allowed under the rules to fund the Closure and Post- Closure Care Funds. EnergySolutions has chosen to fund their costs through the use of an insurance policy. Changing mechanisms from an irrevocable trust to an insurance policy required extensive review by the DSHW and the Utah Attorney General's Office. The duration of the Post-Closure Care Period is generally designated as 30 years under the hazardous waste rules. The Legislature of the State of Utah commissioned a review of the need for Perpetual Care Funds for hazardous waste facilities. This fund would provide funds for maintenance and monitoring of facilities following termination of the Post-Closure Permit. The DSHW has recommended to the legislature that a perpetual care fund be created. The legislature will study the recommendation and take appropriate action. (authors)« less
Song, David H; Wu, Liza C; Lohman, Robert F; Gottlieb, Lawrence J; Franczyk, Mieczyslawa
2003-01-01
A method to refine the treatment of sternal wounds using Vacuum Assisted Closure (V.A.C.) therapy as the bridge between débridement and delayed definitive closure is described. A retrospective review of 35 consecutive patients with sternal wound complications over a 2-year period (March of 1999 to March of 2001) was performed. The treatment of sternal wounds with traditional twice-a-day dressing changes was compared with the treatment with the wound V.A.C. device. An analysis of the number of days between initial débridement and closure, number of dressing changes, number and types of flaps needed for reconstruction, and complications was performed. Eighteen patients were treated with traditional twice-a-day dressing changes and 17 patients were treated with V.A.C. therapy alone. The two groups were similar regarding age, sex, type of cardiac procedure, and type of sternal wound. The V.A.C. therapy group had a trend toward a shorter interval between débridement and closure, with a mean of 6.2 days, whereas the dressing change group had mean of 8.5 days. The V.A.C. therapy group had a significantly lower number of dressing changes, with a mean of three, whereas the twice-a-day dressing change group had a mean of 17 (p < 0.05). Reconstruction required an average of 1.5 soft-tissue flaps per patient treated with traditional dressing changes versus 0.9 soft-tissue flaps per patient for those treated with V.A.C. therapy (p < 0.05). Before closure, there was one death among patients undergoing dressing changes and three in the V.A.C. therapy group, all of which were unrelated to the management of the sternal wound. Patients with sternal wounds who have benefited from V.A.C. therapy alone have a significant decrease in the number of dressing changes and number of soft-tissue flaps needed for closure. Finally, the V.A.C. therapy group had a trend toward a decreased number of days between débridement and closure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
NASA Astrophysics Data System (ADS)
Lundblad, Nathan; Jarvis, Thomas; Paseltiner, Daniel; Lannert, Courtney
2016-05-01
We have proposed using NASA's Cold Atom Laboratory (CAL, launching to the International Space Station in 2017) to generate bubble-geometry Bose-Einstein condensates through radiofrequency dressing of an atom-chip magnetic trap. This geometry has not been truly realized terrestrially due to the perturbing influence of gravity, making it an ideal candidate for microgravity investigation aboard CAL. We report progress in the construction of a functional prototype of the orbital BEC apparatus: a compact atom-chip machine loaded by a 2D+MOT source, conventional 3D MOT, quadrupole trap, and transfer coil. We also present preliminary modeling of the dressed trap uniformity, which will crucially inform the geometric closure of the BEC shell surface as atom number, bubble radius, and bubble aspect ratio are varied. Finally, we discuss plans for experimental sequences to be run aboard CAL guided by intuition from ground-based prototype operation. JPL 1502172.
Goose-neck snare-assisted transcatheter ASD closure: A safety procedure for large and complex ASDs.
Butera, Gianfranco; Lovin, Nicusor; Basile, Domenica Paola; Carminati, Mario
2016-04-01
To report on a new technique that increases the safety of percutaneous atrial septal defect (ASD) closure using a goose-neck snare system. ASD transcatheter closure is a widespread procedure. However, in some cases, ASDs may be large and with soft rims. In these situation, a potential risk exists for device malposition or embolization. When transesophageal echocardiography (TEE) evaluation and balloon sizing showed large defects with floppy rims the chosen Amplatzer device was implanted in a standard way. In large defects with floppy rims, before release a 5-mm goose-neck snare with its 4 Fr catheter was placed across the delivery cable and fixed to catch the screwing mechanism of implanted Amplatzer device. The delivery cable was unscrewed and the device reached its final position without any tension. If the position was considered satisfactory the device was released from the goose-neck snare. Thirteen patients had a snare-assisted ASD transcatheter closure. Median device size was 24 mm (range 14-38 mm). Retrieval or repositioning of the device using the goose-neck snare was performed in four cases: in three patients, because of device malposition after delivery cable release and in one patient, because of unsuitability of closure of a second significant defect. Furthermore, in two subjects with multiple ASDs, a second fenestration looked quite significant with the device still attached to the delivery cable while it appeared smaller after release. Snare-assisted Amplatzer ASD device placement is a new method for ASD percutaneous closure and adds safety to the procedure. © 2016 Wiley Periodicals, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mitchell, Michael Marquand; Little, Bonnie Colleen
The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid wastemore » was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister and Patrick Matthews
2012-11-01
The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less
Penney, Andrew J.; Guinotte, John M.
2013-01-01
United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas. PMID:24358162
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-04-01
Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less
Penney, Andrew J; Guinotte, John M
2013-01-01
United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas.
Braunack-Mayer, Annette; Tooher, Rebecca; Collins, Joanne E; Street, Jackie M; Marshall, Helen
2013-04-15
During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities' understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Drawing on Thompson et al's ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic.
Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan
2014-06-01
Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.
DEVELOPMENT OF NEAR-SHORE HYDRODYNAMIC MODELS FOR BEACH CLOSURE FORECASTING IN THE GREAT LAKES
Water quality managers and other planning and decision entities are increasingly calling for up-to-the-minute data on present water quality conditions or forecasts of these data that can be used to adjust or respond to quickly developing activities with environmental implications...
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
The Psychology of a Crisis: An Opportunity To Learn.
ERIC Educational Resources Information Center
Whiting, Peggy P.
1998-01-01
Crisis events may be viewed as expected, sudden, or catastrophic. Survivors have common needs: recognition of loss, soothing of fear, a sense of what happened, expression of feelings, assistance with adjustment, shared closure rituals, and ways to remember. Schools' crisis-response plans should include intervention and postintervention activities…
7 CFR 225.14 - Requirements for sponsor participation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...
7 CFR 225.14 - Requirements for sponsor participation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...
42 CFR 488.303 - State plan requirement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... recognition, incentive payments, or both, nursing facilities that provide the highest quality care to Medicaid...) Transfer of residents. (5) Closure of the facility and transfer of residents. (6) State monitoring. (e... remedies that are in addition to those specified in paragraph (d) or (e) of this section, or alternative to...
Turbulence, Perturbance, and Educational Change
ERIC Educational Resources Information Center
Beabout, Brian R.
2012-01-01
While scholarship on educational change has long accepted that disruptions to the status quo are an essential part of the change process, disruption has never been more central to planned change than it is in the current political context in the USA, where legislation has mandated school closure, reconstitution, and turnaround as required remedies…
How to Perform Transcaval Access and Closure for Transcatheter Aortic Valve Implantation
Lederman, Robert J.; Babaliaros, Vasilis C.; Greenbaum, Adam B.
2016-01-01
Transcaval, or caval-aortic, access is a promising approach for fully percutaneous trans-catheter aortic valve implantation in patients without good conventional access options. This tutorial review provides step-by-step guidance to planning and executing the procedure, along with approaches to remedy complications. PMID:26356244
America’s Army: The Strength of the Nation, Strategic Plan, 2009-2015
2008-11-02
Realignment and Closure (BRAC) law of 2005 and several complex endeavors like the Grow-the-Army (GTA) and Global Defense Posture Realignment ( GDPR ...2.2.1 Oversee execution of MILCON to support Army stationing (AMF, BRAC, GDPR , and Army Growth) initiatives and timelines
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
ERIC Educational Resources Information Center
Stuart, Reginald
2009-01-01
Today, a national economy gone bust has derailed Black Americans' plans across the country. Gone are many of the economic gains, small as they were, achieved in the post-segregation era by millions of 1960s generation children and their children. Black America today is beset by job losses, business closures, pay cuts, furloughs, investment and…
Numerical and Physical Modelling of Bubbly Flow Phenomena - Final Report to the Department of Energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andrea Prosperetti
This report describes the main features of the results obtained in the course of this project. A new approach to the systematic development of closure relations for the averaged equations of disperse multiphase flow is outlined. The focus of the project is on spatially non-uniform systems and several aspects in which such systems differ from uniform ones are described. Then, the procedure used in deriving the closure relations is given and some explicit results shown. The report also contains a list of publications supported by this grant and a list of the persons involved in the work.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prinja, A. K.
The Karhunen-Loeve stochastic spectral expansion of a random binary mixture of immiscible fluids in planar geometry is used to explore asymptotic limits of radiation transport in such mixtures. Under appropriate scalings of mixing parameters - correlation length, volume fraction, and material cross sections - and employing multiple- scale expansion of the angular flux, previously established atomic mix and diffusion limits are reproduced. When applied to highly contrasting material properties in the small cor- relation length limit, the methodology yields a nonstandard reflective medium transport equation that merits further investigation. Finally, a hybrid closure is proposed that produces both small andmore » large correlation length limits of the closure condition for the material averaged equations.« less
Mathaes, Roman; Mahler, Hanns-Christian; Vorgrimler, Lothar; Steinberg, Henrik; Dreher, Sascha; Roggo, Yves; Nieto, Alejandra; Brown, Helen; Roehl, Holger; Adler, Michael; Luemkemann, Joerg; Huwyler, Joerg; Lam, Philippe; Stauch, Oliver; Mohl, Silke; Streubel, Alexander
2016-01-01
The majority of parenteral drug products are manufactured in glass vials with an elastomeric rubber stopper and a crimp cap. The vial sealing process is a critical process step during fill-and-finish operations, as it defines the seal quality of the final product. Different critical capping process parameters can affect rubber stopper defects, rubber stopper compression, container closure integrity, and also crimp cap quality. A sufficiently high force to remove the flip-off button prior to usage is required to ensure quality of the drug product unit by the flip-off button during storage, transportation, and until opening and use. Therefore, the final product is 100% visually inspected for lose or defective crimp caps, which is subjective as well as time- and labor-intensive. In this study, we sealed several container closure system configurations with different capping equipment settings (with corresponding residual seal force values) to investigate the torque moment required to turn the crimp cap. A correlation between torque moment and residual seal force has been established. The torque moment was found to be influenced by several parameters, including diameter of the vial head, type of rubber stopper (serum or lyophilized) and type of crimp cap (West(®) or Datwyler(®)). In addition, we measured the force required to remove the flip-off button of a sealed container closure system. The capping process had no influence on measured forces; however, it was possible to detect partially crimped vials. In conclusion, a controlled capping process with a defined target residual seal force range leads to a tight crimp cap on a sealed container closure system and can ensure product quality. The majority of parenteral drug products are manufactured in a glass vials with an elastomeric rubber stopper and a crimp cap. The vial sealing process is a critical process step during fill-and-finish operations, as it defines the seal quality of the final product. An adequate force to remove the flip-off button prior to usage is required to ensure product quality during storage and transportation until use. In addition, the complete crimp cap needs to be fixed in a tight position on the vial. In this study, we investigated the torque moment required to turn the crimp cap and the force required to remove the flip-off button of container closure system sealed with different capping equipment process parameters (having different residual seal force values). © PDA, Inc. 2016.
Merging taper lengths for short duration lane closure : final report, December 2009.
DOT National Transportation Integrated Search
2009-12-01
The Utility Industry has requested that the Florida Department of Transportation provide for the use of merging taper lengths that are significantly shorter than the lengths computed using the taper length equations published in the MUTCD Section 6C....
Boyd, Matt; Baker, Michael G.; Mansoor, Osman D.; Kvizhinadze, Giorgi; Wilson, Nick
2017-01-01
Background Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. Objective To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. Methods An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). Results For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, “Scenario A”), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of “Scenario A”, or 2.75% of the country’s population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for “Scenario A” times three for 26 weeks of border closure–but not for only 12 weeks of closure when it would still be beneficial). Conclusions This “proof-of-concept” work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective. PMID:28622344
Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-08-15
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
NASA Astrophysics Data System (ADS)
Sugihardjo, H.; Tavio; Prasetya, D.; Achmad, N. I.
2017-11-01
The impact of temperature change could govern the final stress of structural elements in the long-span steel bridges. The study was conducted to investigate the effect of temperature change during the construction of a new steel arch bridge, namely the Kutai Kartanegara Bridge. The main bridge has a total spanning length of 470 meters. The erection method of the bridge was the cantilever method with temporary towers, mast cranes, and stay cables. The deflections and internal forces of the steel elements were analyzed using the Midas Civil software. The study focuses on the effort to find the perfect erection time for the closure with regards to the temperature. By measuring the temperatures of the steel elements during the construction, it was found that they varied between 19 and 64 degrees Celsius. From the results of the analyses with various temperatures, it can be concluded that the recommended temperature for the closure erection was 44.6 degrees Celsius. This temperature is similar with the air temperature between either 6 AM and 12 noon or 12 noon and 6 PM. During this periods of time, the effect of thermal stress on the final internal forces in the bridge elements was found much lesser than those obtained during any other period of time.
488-1D Ash Basin closure cap help modeling- Microdrain® liner option
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, J. A.
At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—60-mil low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic head formore » the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.15 inches for a minimum slope equal to 3%, which is two orders of magnitude below the SCDHEC upper limit of 12 inches.« less
488-1D Ash basin closure cap help modeling-Microdrain® liner option
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, J.
At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—50-mil linear low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic headmore » for the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.179 inches for a minimum slope equal to 3%, which is approximately two orders of magnitude below the SCDHEC upper limit of 12 inches.« less
Calibration of Linked Hydrodynamic and Water Quality Model for Santa Margarita Lagoon
2016-07-01
was used to drive the transport and water quality kinetics for the simulation of 2007–2009. The sand berm, which controlled the opening/closure of...TECHNICAL REPORT 3015 July 2016 Calibration of Linked Hydrodynamic and Water Quality Model for Santa Margarita Lagoon Final Report Pei...Linked Hydrodynamic and Water Quality Model for Santa Margarita Lagoon Final Report Pei-Fang Wang Chuck Katz Ripan Barua SSC Pacific James
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
Device closure of secundum atrial septal defect's and the risk of cardiac erosion.
Thomson, J D R; Qureshi, S A
2015-12-01
Cardiac erosion related to transcatheter atrial septal defect closure devices is of increasing concern. Erosion is reported to have occurred with most of currently available occluder devices. Perhaps due to the very large number of implants worldwide, the Amplatzer (St Jude) occluder is associated with the majority of cardiac erosion events reported in the literature. Best current estimates of the incidence of erosion with the St Jude device are between one and three cases per 1000 implants. Most events occur early after implantation and it is rare, although not unheard of, for events to occur after a year following device insertion. It is important that those involved with closure programmes are vigilant for the problem, because device-related erosion is associated with a significant mortality risk. Despite considerable debate, the risk factors (either patient or device) for erosion remain unclear and require further investigation. Currently available data sets have focussed largely on erosion cohorts and are unable to place these cases in appropriate context with non-erosion closure cases. What is certain is that programmes implanting these devices must take care to implant appropriately sized devices and have in place plans to ensure that patients are both well informed and can access help and advice in the event of developing symptoms.
Field Performance Of Three Compacted Clay Landfill Covers
A study was conducted at sites in subtropical Georgia, seasonal and humid Iowa, and arid southeastern California to evaluate the field hydrology of compacted clay covers for final closure of landfills. Water balance of the covers was monitored with large (10 by 20 m ), instrumen...
Efficacy of autologous platelets in macular hole surgery.
Konstantinidis, Aristeidis; Hero, Mark; Nanos, Panagiotis; Panos, Georgios D
2013-01-01
The introduction of optical coherence tomography has allowed accurate measurement of the size of macular holes. A retrospective consecutive review was performed of 21 patients undergoing macular hole repair with vitrectomy, gas tamponade, and autologous platelet injection and we assessed the effect of macular hole parameters on anatomic and functional outcomes. We looked at the demographic features, final visual outcome, and anatomical closure. Twenty-one patients were included in the study. They underwent routine vitrectomy with gas tamponade (C3F8) and injection of autologous platelets. All patients were advised to maintain a facedown posture for 2 weeks. Anatomical closure was confirmed in all cases and 20 out of 21 of patients had improved postoperative visual acuity by two or more lines. In our series, the macular hole dimensions did not have much effect on the final results. The use of autologous platelets and strict facedown posture seems to be the deciding factor in good anatomical and visual outcome irrespective of macular hole dimensions.
Developing a Strategic Plan for Transitioning to Healthcare Knowledge Services Centers (HKSCs)
Goldstein, H. Mark; Coletti, Margaret H.
2012-01-01
Facing a negative trend in the form of downsizing, layoffs, and closures, a small committee of hospital librarians in New England was formed in 2004 to provide library advocacy. Between 2008 and 2010, 23 hospital libraries closed in New England. In 2010, the committee shifted its focus from advocacy to a platform for change. This resulted in the creation of the Healthcare Knowledge Services Center (HKSC) Template. The Template is the basis for a 3-phased, 5-year strategic plan to establish several regional pilots, transitioning traditional hospital libraries to healthcare knowledge services centers. This article focuses on Phase One of the strategic plan, Development. PMID:23125551
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Michael G.
This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.
NASA Technical Reports Server (NTRS)
Hohwiesner, Bill; Claudinon, Bernard
1991-01-01
The European Space Agency (ESA) has been working to develop an autonomous rendezvous and docking capability since 1984 to enable Hermes to automatically dock with Columbus. As a result, ESA with Matra, MBB, and other space companies have developed technologies that are also directly supportive of the current NASA initiative for Automated Rendezvous and Capture. Fairchild and Matra would like to discuss the results of the applicable ESA/Matra rendezvous and capture developments, and suggest how these capabilities could be used, together with an existing NASA Explorer Platform satellite, to minimize new development and accomplish a cost effective automatic closure and capture demonstration program. Several RV sensors have been developed at breadboard level for the Hermes/Columbus program by Matra, MBB, and SAAB. Detailed algorithms for automatic rendezvous, closure, and capture have been developed by ESA and CNES for application with Hermes to Columbus rendezvous and docking, and they currently are being verified with closed-loop software simulation. The algorithms have multiple closed-loop control modes and phases starting at long range using GPS navigation. Differential navigation is used for coast/continuous thrust homing, holdpoint acquisition, V-bar hopping, and station point acquisition. The proximity operation sensor is used for final closure and capture. A subset of these algorithms, comprising the proximity operations algorithms, could easily be extracted and tailored to a limited objective closure and capture flight demonstration.
Wolken, Dana M. Alessi; McInnes, Joseph; Pon, Liza A.
2014-01-01
Whereas actomyosin and septin ring organization and function in cytokinesis are thoroughly described, little is known regarding the mechanisms by which the actomyosin ring interacts with septins and associated proteins to coordinate cell division. Here we show that the protein product of YPL158C, Aim44p, undergoes septin-dependent recruitment to the site of cell division. Aim44p colocalizes with Myo1p, the type II myosin of the contractile ring, throughout most of the cell cycle. The Aim44p ring does not contract when the actomyosin ring closes. Instead, it forms a double ring that associates with septin rings on mother and daughter cells after cell separation. Deletion of AIM44 results in defects in contractile ring closure. Aim44p coimmunoprecipitates with Hof1p, a conserved F-BAR protein that binds both septins and type II myosins and promotes contractile ring closure. Deletion of AIM44 results in a delay in Hof1p phosphorylation and altered Hof1p localization. Finally, overexpression of Dbf2p, a kinase that phosphorylates Hof1p and is required for relocalization of Hof1p from septin rings to the contractile ring and for Hof1p-triggered contractile ring closure, rescues the cytokinesis defect observed in aim44∆ cells. Our studies reveal a novel role for Aim44p in regulating contractile ring closure through effects on Hof1p. PMID:24451263
Field-portable supercritical CO{sub 2} extractor
Wright, B.W.; Zemanian, T.S.; Robins, W.H.; Woodcock, L.J.
1997-06-10
The present invention is an apparatus for extracting organic compounds from solid materials. A generator vessel has a removable closure for receiving a solid or liquid solvent which is heated with a resistive heating element to a gaseous or supercritical phase. The removable closure is unencumbered because the side wall is penetrated with an outlet for the gaseous or supercritical solvent. The generator vessel further has a pressure transducer that provides an electronic signal related to pressure of the gaseous or supercritical solvent. The apparatus of the present invention further includes at least one extraction cell having a top and a bottom and a wall extending there between, wherein the bottom is sealably penetrated by an inlet for gaseous or supercritical solvent received through a manifold connected to the outlet, the top having an easy-open removable closure cap, and the wall having an outlet port. Finally, a permeable sample cartridge is included for holding the solid materials and to provide radial-flow of the extraction fluid, which is placed within the extraction cell. 10 figs.
Field-portable supercritical CO.sub.2 extractor
Wright, Bob W.; Zemanian, Thomas S.; Robins, William H.; Woodcock, Leslie J.
1997-01-01
The present invention is an apparatus for extracting organic compounds from solid materials. A generator vessel has a removable closure for receiving a solid or liquid solvent which is heated with a resistive heating element to a gaseous or supercritical phase. The removable closure is unencumbered because the side wall is penetrated with an outlet for the gaseous or supercritical solvent. The generator vessel further has a pressure transducer that provides an electronic signal related to pressure of the gaseous or supercritical solvent. The apparatus of the present invention further includes at least one extraction cell having a top and a bottom and a wall extending therebetween, wherein the bottom is sealably penetrated by an inlet for gaseous or supercritical solvent received through a manifold connected to the outlet, the top having an easy-open removable closure cap, and the wall having an outlet port. Finally, a permeable sample cartridge is included for holding the solid materials and to provide radial-flow of the extraction fluid, which is placed within the extraction cell.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils, from graphic arts operations, from the provision of sampling and testing facilities... Provision of Sampling and Revised 03/21/01....... 05/31/01 Testing Facilities. AVAQMD 1168 Adhesive and... District (1) Rule 205, ``Provision of Sampling and Testing Facilities,'' revised on March 21, 2001...
DOT National Transportation Integrated Search
1998-01-01
The purpose of the ITS Planning Handbook is to provide a tool to assist in meeting current challenges. Specifically, the purposes of the Handbook are to: (1) Identify and describe ways that ITS should be integrated with the mainstream transportation ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
... economic blow that would result from an earlier closure and is an appropriate balance of environmental and... BART rules for the Boardman facility achieve the proper balance of environmental benefits, the cost to... secure greater environmental benefits with a better balance of cost and risk by transitioning the...
40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2013 CFR
2013-10-01
... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2012 CFR
2012-10-01
... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...
Living on a Cotton Farm: Mexican American Life in Texas.
ERIC Educational Resources Information Center
Black, Mary S.
This packet of six lesson plans highlights Mexican-American life on a Texas cotton farm in the early 20th century. Each lesson provides a lesson overview; states educational objectives; cites materials needed; details the procedure for classroom implementation; offers a closure activity; and suggests an extension activity. The packet is divided…
40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...
Building a New High School and Forging a New Community.
ERIC Educational Resources Information Center
Krajewski, Robert
1988-01-01
Two aging structures were replaced by Central High School in an Indiana steel town. Planning, board and administrator support, and community involvement eased negative attitudes toward the high school closures and resulted in a $36 million school that has unified the city and will serve it for over 50 years. (MLF)
Flood-inundation maps for Grand River, Red Cedar River, and Sycamore Creek near Lansing, Michigan
Whitehead, Matthew; Ostheimer, Chad J.
2015-08-26
These maps, used in conjunction with real-time USGS streamgage data and NWS forecasting, provide critical information to emergency management personnel and the public. This information is used to plan flood response actions, such as evacuations and road closures, as well as aid in postflood recovery efforts.
40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified in...
40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified in...
40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified in...
40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified in...
40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified in...
NASA Astrophysics Data System (ADS)
Liu, Qian; Zhao, Guochun
2017-04-01
The Alxa Terrane is a crucial place situated between the North China Craton to the east and the Tarim Craton to the west. The Late Paleozoic magmatic record in the Alxa Terrane places important constraints on the timing of the final closure of the middle segment of the Paleo-Asian Ocean (PAO). In this study, new LA-ICPMS zircon U-Pb dating results reveal ca. 300-268 Ma gabbros and diorites in the Bayan Nuru area in the eastern part of the Alxa Terrane. The 300 Ma gabbros show plagioclase accumulations with anorthite compositions (An92-95), arc-like geochemical affinities with relative enrichment in large ionic lithophile elements and depletion in high field strength elements (e.g., Ti, Nb and Ta), as well as negative Hf(t) (-6.01 to -1.75) and Nd(t) (-9.5 to -7.1) values and high initial 87Sr/86Sr ratios (0.707157-0.707220). These features indicate a magma source of an enriched lithospheric mantle metasomatized by high fluid activities. In comparison, the 280-268 Ma gabbros and diorites also have arc-like geochemical affinities but show increasingly evolved isotope compositions, implying more sediment inputs. Compiled zircon ɛHf(t) and whole-rock ɛNd(t) values of the magmatic rocks in the Alxa Terrane decrease from the Late Carboniferous to the Early Permian, and increase from the Middle Permian to the Triassic. The considerably large spread in ɛHf(t) and ɛNd(t) values at ca. 280-265 Ma likely reflects a tectonic switch from a subduction setting to a post-collisional setting, corresponding to the timing of the final closure of the PAO in the Alxa Terrane. Thus, the PAO progressively closed from west to east along the northern margin of the Tarim Craton, the Alxa Terrane, and then the northern margin of the North China Craton during Late Carboniferous to Middle Triassic time. This work was financially supported by a NSFC Project (41190075) entitled "Final Closure of the Paleo-Asian ocean and Reconstruction of East Asian Blocks in Pangea", the fifth research project in the NSFC Major Program (41190070) "Reconstruction of East Asian Blocks in Pangea", a Hong Kong RGC GRF (HKU7063/13P and 17301915), NSFC General Projects (41230207 and 41390441) and a HKU Seed Funding Programme for Basic Research (201311159126).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
Turan, Cem; Büyükbayrak, Esra Esim; Yilmaz, Aylin Onan; Karsidag, Yasemin Karageyim; Pirimoglu, Meltem
2015-04-01
To compare the classical double-layer uterine closure to a double-layer purse-string uterine closure (Turan technique) in cesarean section regarding short- and long-term results. Patients were randomized into either the double-layer purse-string uterine closure arm (study group, 84 patients) or the classical double-layer uterine closure arm (control group, 84 patients). For short-term comparison, a detailed transvaginal ultrasound examination was planned in all patients 6 weeks after the operation and a wedge-shaped defect in the uterine incision scar was accepted as uterine scar defect and recorded. For the long-term comparison, subsequent pregnancies of these patients were followed up for any complication. The number of patients with ultrasonographically visible uterine scar defect was 12 (23.5% of all scar defects) in the study group whereas it was 39 (76.5% of all scar defects) in the control group (P < 0.001, χ(2) = 15.42). Demographic data, operation time, hospitalization time, preoperative and postoperative hemoglobin values were not significantly different between the groups. During the 2-year of the follow-up period, five patients in the study group and six patients in the control group became pregnant again. No complication during their pregnancies and second cesarean operation were encountered. With the Turan technique, the uterine incision length becomes shorter, and the frequency of uterine scar defect is lower regarding short-term results. More data is needed for long-term results. ClinicalTrials.gov NCT01287611. © 2014 The Authors. Journal of Obstetrics and Gynaecology Research © 2014 Japan Society of Obstetrics and Gynecology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boehlecke, R. F.
This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less
Burn Wound Healing and Tissue Engineering.
Singer, Adam J; Boyce, Steven T
In 2016 the American Burn Association held a State of the Science conference to help identify burn research priorities for the next decade. The current paper summarizes the work of the sub-committee on Burn Wound Healing and Tissue Engineering. We first present the priorities in wound healing research over the next 10 years. We then summarize the current state of the science related to burn wound healing and tissue engineering including determination of burn depth, limiting burn injury progression, eschar removal, management of microbial contamination and wound infection, measuring wound closure, accelerating wound healing and durable wound closure, and skin substitutes and tissue engineering. Finally, a summary of the round table discussion is presented.
NASA Astrophysics Data System (ADS)
Newell, Alan C.; Rumpf, Benno
2011-01-01
In this article, we state and review the premises on which a successful asymptotic closure of the moment equations of wave turbulence is based, describe how and why this closure obtains, and examine the nature of solutions of the kinetic equation. We discuss obstacles that limit the theory's validity and suggest how the theory might then be modified. We also compare the experimental evidence with the theory's predictions in a range of applications. Finally, and most importantly, we suggest open challenges and encourage the reader to apply and explore wave turbulence with confidence. The narrative is terse but, we hope, delivered at a speed more akin to the crisp pace of a Hemingway story than the wordjumblingtumbling rate of a Joycean novel.
Gonioscopy in primary angle closure glaucoma.
Bruno, Christina A; Alward, Wallace L M
2002-06-01
Primary angle closure is a condition characterized by obstruction to aqueous humor outflow by the peripheral iris, and results in changes in the iridocorneal angle that are visible through gonioscopic examination. Gonioscopy in these eyes, however, can be difficult. This chapter discusses techniques that might help in the examination. These include beginning the examination with the inferior angle, methods to help in looking over the iris, cycloplegia, locating the corneal wedge, indentation, van Herick estimation, examining the other eye, and topical glycerin. Finally, there is a discussion about the pathology associated with the closed angle, with emphasis on the appearance of iris bombé, plateau iris, and the distinction between iris processes and peripheral anterior synechiae.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-02-24
This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.
Microelectromechanical safing and arming apparatus
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koehler, David R; Hoke, Darren A; Weichman, Louis S
2006-05-30
A two-stage acceleration sensing apparatus is disclosed which has applications for use in a fuze assembly for a projected munition. The apparatus, which can be formed by bulk micromachining or LIGA, can sense acceleration components along two orthogonal directions to enable movement of a shuttle from an "as-fabricated" position to a final position and locking of the shuttle in the final position. With the shuttle moved to the final position, the apparatus can perform one or more functions including completing an explosive train or an electrical switch closure, or allowing a light beam to be transmitted through the device.
Microelectromechanical safing and arming apparatus
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koehler, David R; Hoke, Darren A; Weichman, Louis S
2008-06-10
A two-stage acceleration sensing apparatus is disclosed which has applications for use in a fuze assembly for a projected munition. The apparatus, which can be formed by bulk micromachining or LIGA, can sense acceleration components along two orthogonal directions to enable movement of a shuttle from an "as-fabricated" position to a final position and locking of the shuttle in the final position. With the shuttle moved to the final position, the apparatus can perform one or more functions including completing an explosive train or an electrical switch closure, or allowing a light beam to be transmitted through the device.
40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise in...
40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous...
40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise in...
40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous...
40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise in...
40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise in...
40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous...
40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous...
40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise in...
40 CFR 267.116 - What must I do with contaminated equipment, structure, and soils?
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment, structure, and soils? 267.116 Section 267.116 Protection of Environment ENVIRONMENTAL PROTECTION..., structure, and soils? You must properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous...
Small Schools Task Force. Final Report.
ERIC Educational Resources Information Center
Eugene School District 4J, OR.
In the spring of 1975 the Eugene (Oregon) school board appointed a task force to make a comprehensive study related to all aspects of possible closure of small schools. Consideration was given to population and enrollment trends; economics; building condition; school size; school design; neighborhood and community implications; program capacity;…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... Rooms Gonzaga University, Foley Center Library, 101-L East 502 Boone, Spokane, Washington 99258, (509) 313-5931. Portland State University, Government Information, Branford Price Millar Library, 1875 SW Park Avenue, Portland, Oregon 97201, (503) 725- 5874. University of Washington, Suzzallo-Allen Library...
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the...) Maintaining and operating the gas monitoring system in accordance with the requirements of § 258.23. (b) The... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
DOT National Transportation Integrated Search
1998-04-01
This final report establishes the scientific validity of the ocular measure "Perclose" as a generally useful and reliable index of lapses in visual attention, i.e. the percentage of eyelid closure over the pupil. Perclose was previously specified as ...
78 FR 48291 - Amendment of Class D Airspace; Columbus, Rickenbacker International Airport, OH
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Airport, OH AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class D airspace at Rickenbacker International Airport, Columbus, OH. Changes to the airspace description are necessary due to the closure of South Columbus Airport. The FAA is taking this action to...
Closure of the R Reactor Disassembly Basin at the SRS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austin, W.E.
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less
488-4D ASH LANDFILL CLOSURE CAP HELP MODELING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phifer, M.
At the request of Area Completion Projects (ACP) in support of the 488-4D Landfill closure, the Savannah River National Laboratory (SRNL) has performed Hydrologic Evaluation of Landfill Performance (HELP) modeling of the planned 488-4D Ash Landfill closure cap to ensure that the South Carolina Department of Health and Environmental Control (SCDHEC) limit of no more than 12 inches of head on top of the barrier layer (saturated hydraulic conductivity of no more than 1.0E-05 cm/s) in association with a 25-year, 24-hour storm event is not projected to be exceeded. Based upon Weber 1998 a 25-year, 24-hour storm event at themore » Savannah River Site (SRS) is 6.1 inches. The results of the HELP modeling indicate that the greatest peak daily head on top of the barrier layer (i.e. geosynthetic clay liner (GCL) or high density polyethylene (HDPE) geomembrane) for any of the runs made was 0.079 inches associated with a peak daily precipitation of 6.16 inches. This is well below the SCDHEC limit of 12 inches.« less
Criticality assessment of LLRWDF closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sarrack, A.G.; Weber, J.H.; Woody, N.D.
1992-10-06
During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of themore » LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted.« less
Family planning funding cuts and teen childbearing.
Packham, Analisa
2017-09-01
Publicly funded family planning clinics provide low-cost and free contraception to nearly 1.5 million teens each year. In recent years, several states have considered legislation to defund family planning services, although little is known about how these cuts affect teen pregnancy. This paper fills this knowledge gap by exploiting a policy change in Texas that reduced funding for family planning services by 67% and resulted in over 80 clinic closures. I estimate the effects of the funding cuts on teen health outcomes using a difference-in-differences approach that compares the changes in teen birth rates in Texas counties that lost family planning funding to changes in counties outside of Texas with publicly funded clinics. I find that reducing funding for family planning services in Texas increased teen birth rates by approximately 3.4% over four years with effects concentrated 2-3 years after the initial cuts. Copyright © 2017 Elsevier B.V. All rights reserved.
Process quality planning of quality function deployment for carrot syrup
NASA Astrophysics Data System (ADS)
Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon
2017-06-01
Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.
303-K Storage Facility closure plan. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-15
Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
2013-01-01
Background During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities’ understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. Methods We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Results Drawing on Thompson et al’s ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. Conclusions We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic. PMID:23587175
Zhang, Tianyou; Fu, Xiuju; Ma, Stefan; Xiao, Gaoxi; Wong, Limsoon; Kwoh, Chee Keong; Lees, Michael; Lee, Gary Kee Khoon; Hung, Terence
2012-01-01
Background It is believed that combined interventions may be more effective than individual interventions in mitigating epidemic. However there is a lack of quantitative studies on performance of the combination of individual interventions under different temporal settings. Methodology/Principal Findings To better understand the problem, we develop an individual-based simulation model running on top of contact networks based on real-life contact data in Singapore. We model and evaluate the spread of influenza epidemic with intervention strategies of workforce shift and its combination with school closure, and examine the impacts of temporal factors, namely the trigger threshold and the duration of an intervention. By comparing simulation results for intervention scenarios with different temporal factors, we find that combined interventions do not always outperform individual interventions and are more effective only when the duration is longer than 6 weeks or school closure is triggered at the 5% threshold; combined interventions may be more effective if school closure starts first when the duration is less than 4 weeks or workforce shift starts first when the duration is longer than 4 weeks. Conclusions/Significance We therefore conclude that identifying the appropriate timing configuration is crucial for achieving optimal or near optimal performance in mitigating the spread of influenza epidemic. The results of this study are useful to policy makers in deliberating and planning individual and combined interventions. PMID:22403634
Association of land use and beach closure in the United ...
Swimming in natural waters (e.g., oceans, lakes, rivers) is one of most popular recreational activities in the United States. However, exposure to pathogens (e.g., Salmonella spp., Shigella spp., Cryptosporidium, Giardia, adenovirus, norovirus) in recreational waters can lead to a variety of adverse health outcomes. To protect public health and reduce the number of outbreaks associated with recreational waters, the BEACH Act was passed in 2000, which required beach regulators to develop a formal plan to assess beach water quality and to notify the public if recreational waters are unsafe. High levels of microorganisms in water often follow extreme weather events. Besides extreme weather events, the proximity of certain land uses to beaches may also have great influence on beach water quality. Microbial contaminants that lead to beach closures and human illness come mainly from land, either from discrete point sources or from diffuse non-point sources. It is expected that land use will have considerable influence on beach microbial water quality. However, to date, studies on impacts of land use on beach microbial contamination are rare, and few researchers are aware of the relationship between land use and beach closures.In this study, we analyzed beach closure data obtained from 2004 to 2013 for more than 500 beaches in the United States, and examined their associations with land use around beaches in 2006 and 2011. The results show that the number of beach clos
Application of WebGIS for traffic risk assessment
NASA Astrophysics Data System (ADS)
Voumard, Jérémie; Aye, Zar Chi; Derron, Marc-Henri; Jaboyedoff, Michel
2015-04-01
Roads and railways are threatened throughout the year by several natural hazards around the world, leading to the closing of transportation corridors, loss of access, deviation travels and potentially infrastructures damages and loss of human lives and also financial, social and economic consequences. Protection measures used to reduce the exposure to natural hazards are usually expensive and cannot be deployed on an entire transportation network. It is thus necessary to choose priority areas where protection measures need to be built. The aim of this study is to propose a friendly tool to evaluate and to understand issues and consequences of section closing and affected parts of a transportation network at small region scale. The proposed tool, currently in its design and building phase, will provide ways to simulate different closure scenarios and to analyze their consequences on transportation network; like deviating traffic on others roads and railways sections, additional time and distance travel or accessibility for emergency services like police, firefighters and ambulances. The tool is based on OpenGeo architecture, which is composed of open-source components. It integrates PostGIS for database, GeoServer and GeoWebCache for application servers and finally GeoExt and OpenLayers for user interface. Users will be able to attribute quantitative (like roads and railway type and closure consequences) and qualitative (like section unavailability duration, season, etc.) data to the different roads and railways sections based on their user rights. They will also be able to evaluate different track closures consequences in terms of different scenarios. Once finalized, the goal of this project including natural hazards, traffic and geomatic thematic is to propose a decision support tool for public authorities firstly and for specialists secondly so that they can evaluate easily and accurately as much as possible to highlight the weakpoints of the transportation network in the case track closures due to natural hazards.
Swine-Flu Plans Put E-Learning in the Spotlight
ERIC Educational Resources Information Center
Davis, Michelle R.; Ash, Katie
2009-01-01
Last school year, many educators were caught unprepared when schools closed in response to cases of swine flu. This time around, both the federal government and school districts are putting specific online-learning measures in place to get ready for possible closures or waves of teacher and student absences because of a flu outbreak. To prepare…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-04
...-BC58 Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Shrimp Fishery Off the Southern... Fishery Management Plan for the Shrimp Fishery of the South Atlantic Region (FMP) for review, approval... Atlantic states may request a concurrent closure of the penaeid shrimp (brown, pink, and white shrimp...
1998-12-01
3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC
Managing Temporary School Closure Due to Environmental Hazard: Lessons from New Zealand
ERIC Educational Resources Information Center
Stuart, Kathy L.; Patterson, Lesley G.; Johnston, David M.; Peace, Robin
2013-01-01
The February 2011 Canterbury earthquake was a dramatic reminder of the need for schools to have emergency management plans in place. A number of other disaster and hazard events have historically caused New Zealand schools to close temporarily, and often within a short time frame. At such times principals must act decisively and communicate…
Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilborn, Bill R.; Boehlecke, Robert F.
The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less
Media reporting of tenofovir trials in Cambodia and Cameroon
Mills, Edward; Rachlis, Beth; Wu, Ping; Wong, Elaine; Wilson, Kumanan; Singh, Sonal
2005-01-01
Background Two planned trials of pre-exposure prophylaxis tenofovir in Cambodia and Cameroon to prevent HIV infection in high-risk populations were closed due to activist pressure on host country governments. The international news media contributed substantially as the primary source of knowledge transfer regarding the trials. We aimed to characterize the nature of reporting, specifically focusing on the issues identified by media reports regarding each trial. Methods With the aid of an information specialist, we searched 3 electronic media databases, 5 electronic medical databases and extensively searched the Internet. In addition we contacted stakeholder groups. We included media reports addressing the trial closures, the reasons for the trial closures, and who was interviewed. We extracted data using content analysis independently, in duplicate. Results We included 24 reports on the Cambodian trial closure and 13 reports on the Cameroon trial closure. One academic news account incorrectly reported that it was an HIV vaccine trial that closed early. The primary reasons cited for the Cambodian trial closure were: a lack of medical insurance for trial related injuries (71%); human rights considerations (71%); study protocol concerns (46%); general suspicions regarding trial location (37%) and inadequate prevention counseling (29%). The primary reasons cited for the Cameroon trial closure were: inadequate access to care for seroconverters (69%); participants not sufficiently informed of risks (69%); inadequate number of staff (46%); participants being exploited (46%) and an unethical study design (38%). Only 3/23 (13%) reports acknowledged interviewing research personnel regarding the Cambodian trial, while 4/13 (30.8%) reports interviewed researchers involved in the Cameroon trial. Conclusion Our review indicates that the issues addressed and validity of the media reports of these trials is highly variable. Given the potential impact of the media in formulation of health policy related to HIV, efforts are needed to effectively engage the media during periods of controversy in the HIV/AIDS epidemic. PMID:16120208
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-05-01
This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gibbons, Robert D., E-mail: rdg@uchicago.edu; Morris, Jeremy W.F., E-mail: jmorris@geosyntec.com; Prucha, Christopher P., E-mail: cprucha@wm.com
2014-09-15
Highlights: • Longitudinal data analysis using a mixed-effects regression model. • Dataset consisted of a total of 1402 samples from 101 closed municipal landfills. • Target analytes and classes generally showed predictable degradation trends. • Validates historical studies focused on macro organic indicators such as BOD. • BOD can serve as “gateway” indicator for planning leachate management. - Abstract: Landfill functional stability provides a target that supports no environmental threat at the relevant point of exposure in the absence of active control systems. With respect to leachate management, this study investigates “gateway” indicators for functional stability in terms of themore » predictability of leachate characteristics, and thus potential threat to water quality posed by leachate emissions. Historical studies conducted on changes in municipal solid waste (MSW) leachate concentrations over time (longitudinal analysis) have concentrated on indicator compounds, primarily chemical oxygen demand (COD) and biochemical oxygen demand (BOD). However, validation of these studies using an expanded database and larger constituent sets has not been performed. This study evaluated leachate data using a mixed-effects regression model to determine the extent to which leachate constituent degradation can be predicted based on waste age or operational practices. The final dataset analyzed consisted of a total of 1402 samples from 101 MSW landfills. Results from the study indicated that all leachate constituents exhibit a decreasing trend with time in the post-closure period, with 16 of the 25 target analytes and aggregate classes exhibiting a statistically significant trend consistent with well-studied indicators such as BOD. Decreasing trends in BOD concentration after landfill closure can thus be considered representative of trends for many leachate constituents of concern.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.
2013-03-18
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less
Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ziock, Robert; Little, Bonnie Colleen
The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alvarado, Juan; Matthews, Patrick
This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less
Specialty hospital market proliferation: Strategic implications for general hospitals.
Al-Amin, Mona; Zinn, Jacqueline; Rosko, Michael D; Aaronson, William
2010-01-01
Since the early 1990s, specialty hospitals have been continuously increasing in number. A moratorium was passed in 2003 that prohibited physicians' referrals of Medicare patients to newly established specialty hospitals if the physician has ownership stakes in the hospital. Although this moratorium expired in effect in 2007, many are still demanding that the government pass new policies to discourage the proliferation of specialty hospitals. This study aimed at examining the regulatory and environmental forces that influence specialty hospitals founding rate. Specifically, we use the resource partitioning theory to investigate the relationship between general hospitals closure rates and the market entry of specialty hospitals. This study will help managers of general hospitals in their strategic thinking and planning. We rely on secondary data resources, which include the American Hospital Association, Area Resource file, census, and Center for Medicare and Medicaid Services data, to perform a longitudinal analysis of the founding rate of specialty hospital in the 48 states. Specifically, we use the negative binomial generalized estimating equation approach available through Stata 9.0 to study the effect of general hospitals closure rate and environmental variables on the proliferation of specialty hospitals. Specialty hospitals founding rate seems to be significantly related to general hospitals closure rates. Moreover, results indicate that economic, supply, regulatory, and financial conditions determine the founding rate of specialty hospitals in different states. The results from this study indicate that the closure of general hospitals creates market conditions that encourage the market entry of specialized health care delivery forms such as specialty hospitals. Managers of surviving general hospitals have to view the closure of other general hospitals not just as an opportunity to increase market share but also as a threat of competition from new forms of health care organizations.
Blanc, Thomas; Guerin, Florent; Franchi-Abella, Stéphanie; Jacquemin, Emmanuel; Pariente, Danièle; Soubrane, Olivier; Branchereau, Sophie; Gauthier, Frédéric
2014-07-01
To propose an anatomical classification of congenital portosystemic shunts (CPSs) correlating with conservative surgery. CPSs entail a risk of life-threatening complications because of poor portal inflow, which may be prevented or cured by their closure. Current classifications based on portal origin of the shunt are not helpful for planning conservative surgery. Twenty-three patients who underwent at least 1 surgical procedure to close the CPSs were included in this retrospective study (1997-2012). We designed a classification according to the ending of the shunt in the caval system. We analyzed the results and outcomes of surgery according to this classification. Two patients had an extrahepatic portosystemic shunt, 17 had a portacaval shunt [subdivided in 5 end-to-side-like portal-caval, 7 side-to-side-like portal-caval, and 5 H-shaped (H-type portal-caval)], 2 had portal-to-hepatic vein shunts (portohepatic), and 2 had a persistent ductus venosus. All extrahepatic portosystemic shunts, H-type portal-caval, portohepatic, and patent ductus venosus patients had a successful 1-stage ligation. All 5 end-to-side-like portal-caval patients had a threadlike intrahepatic portal venous system; a 2-stage complete closure was successfully achieved for 4 and a partial closure for 1. The first 2 side-to-side-like portal-caval patients had a successful 2-stage closure whereas the 5 others had a 1-stage longitudinal caval partition. All patients are alive and none needed a liver transplantation. Our classification correlates the anatomy of CPSs and the surgical strategy: outcomes are good provided end-to-side-like portal-caval shunts patients have a 2-stage closure, side-to-side portal-caval shunts patients have a 1-stage caval partition, and the others have a 1-stage ligation.
Johnson, Carole D.; White, Eric A.; Joesten, Peter K.
2012-01-01
Time‐lapse geophysical surveys using frequency‐domain electromagnetics (FDEM) can indirectly measure time‐varying hydrologic parameters such as fluid saturation or solute concentration. Monitoring of these processes provides insight into aquifer properties and the effectiveness of constructed controls (such as leachate interceptor trenches), as well as aquifer responses to natural or induced stresses. At the University of Connecticut landfill, noninvasive, electromagnetic induction (EMI) methods were used to monitor changes in subsurface electrical conductivity that were related to the landfill‐closure activities. After the landfill was closed, EMI methods were used to monitor changes in water saturation and water quality. As part of a long‐term monitoring plan to observe changes associated with closure, redevelopment, and remediation of the former landfill, EMI data were collected to supplement information from groundwater samples collected in wells to the south and north of the landfill. In comparison to single‐point measurements that could have been collected by conventional installation of additional monitoring wells, the EMI methods provided increased spatial coverage, and were less invasive and therefore less destructive to the wetland north of the landfill. To monitor effects of closure activities on the subsurface conductivity, EMI measurements were collected from 2004 to 2011 along discrete transects north and south of the landfill prior to, during, and after the landfill closure. In general, the results indicated an overall decline in subsurface electrical conductivity with time and with distance from the former landfill. This decline in electrical conductivity indicated that the closure and remediation efforts reduced the amount of leachate that originated from the landfill and that entered the drainages to the north and south of the landfill.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hofmanna, Sigurd; Institut fuer Kernphysik, Goethe-Universitaet Frankfurt, Max von Laue-Strasse 1, 60438 Frankfurt am Main
2010-06-01
The nuclear shell model predicts that the next doubly magic shell-closure beyond {sup 208}Pb is at a proton number Z = 114, 120, or 126 and at a neutron number N = 184. The outstanding aim of experimental investigations is the exploration of this region of spherical 'SuperHeavy Elements'(SHEs). Experimental methods are described, which allowed for the identification of elements produced on a cross-section level of about 1 pb. Reactions used at SHIP are based on targets of lead and uranium. The decay data reveal that for the heaviest elements, the dominant decay mode is alpha emission, not fission. Decaymore » properties as well as reaction cross-sections are compared with results obtained at other laboratories and with results of theoretical investigations. Finally, plans are presented for the further development of the experimental set-up and the application of new techniques, as for instance the precise mass measurement of the produced nuclei using ion traps. At increased sensitivity, detailed exploration of the region of spherical SHEs will start, after first steps on the island of SHEs were made in recent years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hofmann, Sigurd; Institut fuer Kernphysik, Goethe-Universitaet Frankfurt, Max von Laue-Strasse 1, 60438 Frankfurt am Main
2010-04-30
The nuclear shell model predicts that the next doubly magic shell-closure beyond {sup 208}Pb is at a proton number Z = 114, 120, or 126 and at a neutron number N = 184. The outstanding aim of experimental investigations is the exploration of this region of spherical 'Super-Heavy Elements'(SHEs). Experimental methods are described, which allowed for the identification of elements produced on a cross-section level of about 1 pb. Reactions used at SHIP are based on targets of lead and uranium. The decay data reveal that for the heaviest elements, the dominant decay mode is alpha emission, not fission. Decaymore » properties as well as reaction cross-sections are compared with results obtained at other laboratories and with results of theoretical investigations. Finally, plans are presented for the further development of the experimental setup and the application of new techniques, as for instance the precise mass measurement of the produced nuclei using ion traps. At increased sensitivity, detailed exploration of the region of spherical SHEs will start, after first steps on the island of SHEs were made in recent years.« less
NASA Astrophysics Data System (ADS)
Lahoche, Vincent; Ousmane Samary, Dine
2017-02-01
This paper is focused on the functional renormalization group applied to the T56 tensor model on the Abelian group U (1 ) with closure constraint. For the first time, we derive the flow equations for the couplings and mass parameters in a suitable truncation around the marginal interactions with respect to the perturbative power counting. For the second time, we study the behavior around the Gaussian fixed point, and show that the theory is nonasymptotically free. Finally, we discuss the UV completion of the theory. We show the existence of several nontrivial fixed points, study the behavior of the renormalization group flow around them, and point out evidence in favor of an asymptotically safe theory.
Lost in Translation: The Power of Language
ERIC Educational Resources Information Center
Farquhar, Sandy; Fitzsimons, Peter
2011-01-01
The paper examines some philosophical aspects of translation as a metaphor for education--a metaphor that avoids the closure of final definitions, in favour of an ongoing and tentative process of interpretation and revision. Translation, it is argued, is a complex process involving language, within and among cultures, and in the exercise of power.…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... openings during designated hours. This rule also removes previously authorized closure periods for the... for requesting emergency bridge openings. DATES: This rule is effective June 24, 2013. ADDRESSES... needed to request emergency openings of the bridge. C. Discussion of Comments, Changes and the Final Rule...
The Senior Year Experience. Facilitating Integration, Reflection, Closure, and Transition.
ERIC Educational Resources Information Center
Gardner, John N.; Van der Veer, Gretchen
The theme of this collection of 17 monographs is defined as the "senior year experience," that final period of the undergraduate experience leading to entry into graduate school or the workplace. Part 1, "Understanding the Unique Needs of Today's Seniors," examines the characteristics and needs of senior as they make the…
Gossypiboma versus Gossip-Boma.
Singh, Charanjeet; Gupta, Mamta
2011-01-01
Gossypiboma, or a retained surgical sponge, is a rare condition, and it can occur after any surgical intervention that requires use of internal swabs. A case of an eight-year-old girl is presented, who had right minithoracotomy for ASD closure. She was finally diagnosed to have a retained surgical sponge in the right pleural cavity.
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
77 FR 47525 - Safety Zone, Mississippi River, Mile Marker 291 to 295
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... (COTP) New Orleans or a designated representative. Any full closures will be announced via Broadcast... from the hazards associated with dredging operations performed on a waterway, the COTP New Orleans will..., 2012. C. Discussion of Comments, Changes and the Final Rule The Captain of the Port New Orleans will...
75 FR 44144 - Washington: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
....19. 400(3)(c)(xiii)(A) Correction--the 265.300 Subpart word N--Landfills, carbonaceous related... recycling Subpart G exception from related; closure and 264.140, financial 265.140 Subpart responsibility H...) Correction--chang 264.143. e ``resource reclamation units'' to ``recycling units''. 620(4)(d)(iv...
75 FR 39168 - Special Regulations; Areas of the National Park System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... his death in 1972. During the closure, we completed four projects: installation of a new HVAC system... to either bulge or crack. The existing HVAC system installed in 1985 failed to maintain a stable...; Areas of the National Park System AGENCY: National Park Service. ACTION: Final Rule. SUMMARY: The...
Good Teaching Matters, Teachers Matter, and Teacher Education Matters
ERIC Educational Resources Information Center
Gordon, Lynn Melby
2012-01-01
This paper was the keynote address at the June 6, 2012 Occidental College completion ceremony for new teachers completing their teacher credential program. This occasion was momentous because it was the final new teacher graduation that Occidental College would hold, due to the previously announced closure of the teacher preparation program by the…
Economic Value of Army Foreign Military Sales
2015-12-01
12 2. Direct Commercial Sales vs. Foreign Military Sales .....................15 3...the final bill to the customer, and the DSCA sends a closure certificate to DFAS. 2. Direct Commercial Sales vs. Foreign Military Sales Direct ...is defined as the “coproduction, licensed production, countertrade, subcontracting, and technology transfer—mandated by foreign governments as a
78 FR 49906 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 727 airplanes. This AD was prompted by a report of cracking in the left-side chord of the fin closure rib on the vertical stabilizer. This AD requires repetitive inspections of the left and...
NASA Astrophysics Data System (ADS)
Kroonblawd, Matthew P.; Goldman, Nir
2018-05-01
We predict mechanochemical formation of heterogeneous diamond structures from rapid uniaxial compression in graphite using quantum molecular dynamics simulations. Ensembles of simulations reveal the formation of different diamondlike products starting from thermal graphite crystal configurations. We identify distinct classes of final products with characteristic probabilities of formation, stress states, and electrical properties and show through simulations of rapid quenching that these products are nominally stable and can be recovered at room temperature and pressure. Some of the diamond products exhibit significant disorder and partial closure of the energy gap between the highest-occupied and lowest-unoccupied molecular orbitals (i.e., the HOMO-LUMO gap). Seeding atomic vacancies in graphite significantly biases toward forming products with small HOMO-LUMO gap. We show that a strong correlation between the HOMO-LUMO gap and disorder in tetrahedral bonding configurations informs which kinds of structural defects are associated with gap closure. The rapid diffusionless transformation of graphite is found to lock vacancy defects into the final diamond structure, resulting in configurations that prevent s p3 bonding and lead to localized HOMO and LUMO states with a small gap.
Growth in patients with isolated gonadotrophin deficiency.
Dickerman, Z; Cohen, A; Laron, Z
1992-01-01
The growth pattern of 66 patients (50 males, 16 females) with isolated gonadotrophin deficiency (IGnD), who had reached their final height with epiphyseal closure, was evaluated. For the purpose of analysis the males were divided into two groups according to age at referral: group 1 less than 16 years (n = 23) and group 2 greater than or equal to 16 years (n = 27). Sex hormone treatment was initiated at a mean (SD) chronological age of 15.8 (1.3) and 18.6 (1.2) years in groups 1 and 2 in the males and at 15.3 (1.3) years in the females. The duration of treatment (until epiphyseal closure) in the males was 3.9 (1.5) years in group 1 and 2.1 (1.0) years in group 2 and 2.8 (1.3) years in the females. There was no significant difference between the mean final height in groups 1 and 2, but it was significantly higher than the mean parental height (mean height SD score (HtSDS): 0.1 (1.1) v -0.8 (0.9)) and they were significantly correlated. For females the mean HtSDS compared with parental height was 0.4 (1.5) v -0.6 (1.2). It is concluded that the timing of induction of puberty by sex hormones in males and females with IGnD has no significant effect on final height provided that moderate doses are used. Furthermore final height was significantly correlated to mid-parental height. PMID:1580683
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
2000-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less
Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations
NASA Technical Reports Server (NTRS)
Johannsen, G.; Rouse, W. B.; Hillmann, K.
1981-01-01
A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.
Takács, Zsanett; Vilmos, Péter; Lénárt, Péter; Röper, Katja; Erdélyi, Miklós
2017-01-01
ABSTRACT Dorsal closure of the Drosophila embryonic epithelium provides an excellent model system for the in vivo analysis of molecular mechanisms regulating cytoskeletal rearrangements. In this study, we investigated the function of the Drosophila spectraplakin Short stop (Shot), a conserved cytoskeletal structural protein, during closure of the dorsal embryonic epithelium. We show that Shot is essential for the efficient final zippering of the opposing epithelial margins. By using isoform-specific mutant alleles and genetic rescue experiments with truncated Shot variants, we demonstrate that Shot functions as an actin–microtubule cross-linker in mediating zippering. At the leading edge of epithelial cells, Shot regulates protrusion dynamics by promoting filopodia formation. Fluorescence recovery after photobleaching (FRAP) analysis and in vivo imaging of microtubule growth revealed that Shot stabilizes dynamic microtubules. The actin- and microtubule-binding activities of Shot are simultaneously required in the same molecule, indicating that Shot is engaged as a physical crosslinker in this process. We propose that Shot-mediated interactions between microtubules and actin filaments facilitate filopodia formation, which promotes zippering by initiating contact between opposing epithelial cells. PMID:28062848
Paleozoic tectonics in the eastern part of Central Asian Orogenic Belt
NASA Astrophysics Data System (ADS)
Liu, Yongjiang; Li, Weimin; Feng, Zhiqiang; Neubauer, Franz
2017-04-01
The Central Asian Orogenic Belt (CAOB) is the largest accretionary orogen in the world, which is responsible for considerable Phanerozoic juvenile crustal growth. The NE China and its adjacent areas compose the eastern segment of the CAOB, which is a key area for providing important evidence of the CAOB evolution and understanding the NE Asian tectonics. The eastern segment of the CAOB is composed tectonically of four micro-blocks and four sutures, i.e. Erguna block (EB), Xing'an block (XB), Songliao-Xilinhot block (SXB), Jiamusi block (JB), Xinlin-Xiguitu suture (XXS), Heihe-Hegenshan suture (HHS), Mudanjiang-Yilan suture (MYS) and Solonker-Xar Moron-Changchun-Yanji suture (SXCYS). The EB and XB were amalgamated by westward subduction, oceanic island accretions and final collision in ca. 500 Ma. The XB and SXB were amalgamated by subduction-related Early Paleozoic marginal arc, Late Paleozoic marginal arc and final collision in the late Early Carboniferous to early Late Carboniferous. The JB probably had been attached to the SXB in the Early Paleozoic, but broken apart from the SXB in the Triassic and collided back in the Jurassic. The closure of Paleo-Asian Ocean had experienced a long continue/episodic subduction-accretion processes on margins of the NCC to the south and the SXB to the north from the Early to Late Paleozoic. The final closure happened along the SXCYS, from west Solonker, Sonid Youqi, Kedanshan (Keshenketengqi), Xar Moron River through Songliao Basin via Kailu, Tongliao, Horqin Zuoyizhongqi, Changchun, to the east Panshi, Huadian, Dunhua, Yanji, with a scissors style closure in time from the Late Permian-Early Triassic in the west to the Late Permian-Middle Triassic in the east. The amalgamated blocks should compose a united micro-continent, named as Jiamusi-Mongolia Block (JMB) after Early Carboniferous, which bounded by Mongo-Okhotsk suture to the northwest, Solonker-Xar Moron-Changchun suture to the south and the eastern margin of JB to the east.
Flood-inundation maps for the St. Marys River at Decatur, Indiana
Strauch, Kellan R.
2015-08-24
The availability of these maps and associated Web mapping tools, along with the current river stage from USGS streamgages and forecasted flood stages from the NWS, provides emergency managers and residents with information that may be critical for flood-emergency planning and flood response activities such as evacuations and road closures, as well as for post-flood recovery efforts.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
..., Shrimp, and Coral and Coral Reefs Fishery Management Plans for the Gulf of Mexico (Generic ACL Amendment.... 100217097-1757-02] RIN 0648-XC981 Reef Fish Fishery of the Gulf of Mexico; 2013 Accountability Measure [email protected] . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf, which includes hogfish, is...
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or withoutmore » remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2014-04-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 squaremore » miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.« less
Jai, Shrikant; Ganpule, Arvind; Singh, Abhishek; Vijaykumar, Mohankumar; Bopaiah, Vinod; Sabnis, Ravindra; Desai, Mahesh
2016-01-01
High intensity focused ultrasound (HIFU) has come forward as alternative treatment for carcinoma of the prostate. Though minimally invasive,HIFUhas potential side effects. Urethrorectal fistula is one such rare side effect. Management of these fistulas has been described by Vanni et al. This case report describes points of technique that will help successful management of resilient rectourethral fistula. Urinary and faecal diversion in the form of suprapubic catheter and colostomy is vital. Adequate time between stoma formation, fistula closure and then finally stoma closure is needed. Lithotomy position and perineal approach gives best exposure to the fistula. The rectum should be dissected 2cm above the fistula; this aids in tension free closure of the rectal defect. Similarly buccal mucosal graft was used on the urethra to achieve tension free closure. A good vascular pedicle gracilis muscle flap is used to interpose between the two repairs. This not only provides a physical barrier but also provides a vascular bed for BMG uptake. Perfect haemostasis is essential, as any collection may become a site of infection thus compromising results. We strongly recommend rectourethral fistula be directly repaired with gracilis muscle flap with reinforced buccal mucosa graft without attempting any less invasive repairs because the "first chance is the best chance".
Jai, Shrikant; Ganpule, Arvind; Singh, Abhishek; Vijaykumar, Mohankumar; Bopaiah, Vinod; Sabnis, Ravindra; Desai, Mahesh
2017-01-01
High intensity focused ultrasound (HIFU) has come forward as alternative treatment for carcinoma of the prostate. Though minimally invasive,HIFUhas potential side effects. Urethrorectal fistula is one such rare side effect. Management of these fistulas has been described by Vanni et al. This case report describes points of technique that will help successful management of resilient rectourethral fistula. Urinary and faecal diversion in the form of suprapubic catheter and colostomy is vital. Adequate time between stoma formation, fistula closure and then finally stoma closure is needed. Lithotomy position and perineal approach gives best exposure to the fistula. The rectum should be dissected 2cm above the fistula; this aids in tension free closure of the rectal defect. Similarly buccal mucosal graft was used on the urethra to achieve tension free closure. A good vascular pedicle gracilis muscle flap is used to interpose between the two repairs. This not only provides a physical barrier but also provides a vascular bed for BMG uptake. Perfect haemostasis is essential, as any collection may become a site of infection thus compromising results. We strongly recommend rectourethral fistula be directly repaired with gracilis muscle flap with reinforced buccal mucosa graft without attempting any less invasive repairs because the “first chance is the best chance”. PMID:28299181
Ratnayaka, Kanishka; Saikus, Christina E; Faranesh, Anthony Z; Bell, Jamie A; Barbash, Israel M; Kocaturk, Ozgur; Reyes, Christine A; Sonmez, Merdim; Schenke, William H; Wright, Victor J; Hansen, Michael S; Slack, Michael C; Lederman, Robert J
2011-12-01
The aim of this study was to close ventricular septal defects (VSDs) directly through the chest wall using magnetic resonance imaging (MRI) guidance, without cardiopulmonary bypass, sternotomy, or radiation exposure. Surgical, percutaneous, and hybrid management of VSD each have limitations and known morbidity. Percutaneous muscular VSDs were created in 10 naive Yorkshire swine using a transjugular laser catheter. Under real-time MRI guidance, a direct transthoracic vascular access sheath was introduced through the chest into the heart along a trajectory suitable for VSD access and closure. Through this transthoracic sheath, muscular VSDs were occluded using a commercial nitinol device. Finally, the right ventricular free wall was closed using a commercial collagen plug intended for arterial closure. Anterior, posterior, and mid-muscular VSDs (6.8 ± 1.8 mm) were created. VSDs were closed successfully in all animals. The transthoracic access sheath was displaced in 2, both fatal. Thereafter, we tested an intracameral retention sheath to prevent this complication. Right ventricular access ports were closed successfully in all, and after as many as 30 days, healed successfully. Real-time MRI guidance allowed closed-chest transthoracic perventricular muscular VSD closure in a clinically meaningful animal model. Once applied to patients, this approach may avoid traditional surgical, percutaneous, or open-chest transcatheter ("hybrid") risks. Copyright © 2011 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.
Ratnayaka, Kanishka; Saikus, Christina E.; Faranesh, Anthony Z.; Bell, Jamie A.; Barbash, Israel M.; Kocaturk, Ozgur; Reyes, Christine A.; Sonmez, Merdim; Schenke, William H.; Wright, Victor J.; Hansen, Michael S.; Slack, Michael C.; Lederman, Robert J.
2012-01-01
Objectives The aim of this study was to close ventricular septal defects (VSDs) directly through the chest wall using magnetic resonance imaging (MRI) guidance, without cardiopulmonary bypass, sternotomy, or radiation exposure. Background Surgical, percutaneous, and hybrid management of VSD each have limitations and known morbidity. Methods Percutaneous muscular VSDs were created in 10 naive Yorkshire swine using a transjugular laser catheter. Under real-time MRI guidance, a direct transthoracic vascular access sheath was introduced through the chest into the heart along a trajectory suitable for VSD access and closure. Through this transthoracic sheath, muscular VSDs were occluded using a commercial nitinol device. Finally, the right ventricular free wall was closed using a commercial collagen plug intended for arterial closure. Results Anterior, posterior, and mid-muscular VSDs (6.8 ± 1.8 mm) were created. VSDs were closed successfully in all animals. The transthoracic access sheath was displaced in 2, both fatal. Thereafter, we tested an intracameral retention sheath to prevent this complication. Right ventricular access ports were closed successfully in all, and after as many as 30 days, healed successfully. Conclusions Real-time MRI guidance allowed closed-chest transthoracic perventricular muscular VSD closure in a clinically meaningful animal model. Once applied to patients, this approach may avoid traditional surgical, percutaneous, or open-chest transcatheter (“hybrid”) risks. PMID:22192373
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P.
1990-09-01
This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literaturemore » survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.« less
The role of zonal flows in reactive fluid closures
NASA Astrophysics Data System (ADS)
Jan, WEILAND
2018-07-01
We will give an overview of results obtained by our reactive fluid model. It is characterised as a fluid model where all moments with sources in the experiment are kept. Furthermore, full account is taken for the highest moments appearing in unexpanded denominators also including full toroidicity. It has been demonstrated that the strength of zonal flows is dramatically larger in reactive fluid closures than in those which involve dissipation. This gives a direct connection between the fluid closure and the level of excitation of turbulence. This is because zonal flows are needed to absorb the inverse cascade in quasi 2D turbulence. This also explains the similarity in structure of the transport coefficients in our model with a reactive closure in the energy equation and models which have a reactive closure because of zero ion temperature such as the Hasegawa–Wakatani model. Our exact reactive closure unifies several well-known features of tokamak experiments such as the L–H transition, internal transport barriers and the nonlinear Dimits upshift of the critical gradient for onset of transport. It also gives transport of the same level as that in nonlinear gyrokinetic codes. Since these include the kinetic resonance this confirms the validity of the thermodynamic properties of our model. Furthermore, we can show that while a strongly nonlinear model is needed in kinetic theory a quasilinear model is sufficient in the fluid description. Thus our quasilinear fluid model will be adequate for treating all relevant problems in bulk transport. This is finally confirmed by the reproduction by the model of the experimental power scaling of the confinement time τ E ∼ P ‑2/3. This confirms the validity of our reactive fluid model. This also gives credibility to our ITER simulations including the H-mode barrier. A new result is here, that alpha heating strongly reduces the slope of the H-mode barrier. This should significantly reduce the effects of ELM’s.
76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2016-05-01
The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31more » (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
Surgical Techniques at Cesarean Delivery: A U.S. Survey
Lyell, Deirdre J.; Power, Michael; Murtough, Katie; Ness, Amen; Anderson, Britta; Erickson, Kristine; Schulkin, Jay
2016-01-01
Objective To assess the frequency of surgical techniques at cesarean delivery (CD) among U.S. obstetricians. Methods Members of the American College of Obstetrician Gynecologists were randomly selected and e-mailed an online survey that assessed surgical closure techniques, demographics, and reasons. Data were analyzed using SPSS (IBM Corp., Armonk, New York, United States), descriptive statistics, and analysis of variance. Results Our response rate was 53%, and 247 surveys were analyzed. A similar number of respondents either “always or usually” versus “rarely or never” reapproximate the rectus muscles (38.4% versus 43.3%, p = 0.39), and close parietal peritoneum (42.5% versus 46.9%, p = 0.46). The most frequently used techniques were double-layer hysterotomy closure among women planning future children (73.3%) and suturing versus stapling skin (67.6%); the least frequent technique was closure of visceral peritoneum (12.2%). Surgeons who perform double-layer hysterotomy closure had fewer years in practice (15.0 versus 18.7 years, p = 0.021); surgeons who close visceral peritoneum were older (55.5 versus 46.4 years old, p < 0.001) and had more years in practice (23.8 versus 13.8 years practice; p < 0.001). Conclusion Similar numbers of obstetricians either reapproximate or leave open the rectus muscles and parietal peritoneum at CD, suggesting that wide variation in practice exists. Surgeon demographics and safety concerns play a role in some techniques. PMID:28825004
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring. In 2011, DRI installed two meteorological monitoring stations south (station #1) and north (station #2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters are recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2015.« less
National Agricultural-Based Lubricants (NABL) Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honary, Lou
2013-09-30
This project, while defined as a one year project from September 30, 2012 – September 30, 2013, was a continuation of a number of tasks that were defined in previous years. Those tasks were performed and were finalized in this period. The UNI-NABL Center, which has been in operation in various forms since 1991, has closed its facilities since September 2013 and will be phasing out in June 2014. This report covers the individual tasks that were identified in the previous reports and provides closure to each task in its final stage.
Chi, Zhenglin; Chen, Yiheng; Chu, Tinggang; Gao, Weiyang; Li, Zhijie; Yan, Hede; Song, Yonghuan
2018-02-01
The conventional procedure of the sural neuro-fasciocutaneous flap enables the supply of blood and venous drainage by increasing the width of the adipofascial tissue and preserving tiny venous return routes. Moreover, skin graft is a common method for donor site closure, which may lead to some complications and influence the aesthetic appearance. We report modifications for a distally based sural neuro-fasciocutaneous perforator flap and a relaying flap for donor site closure without skin graft. Twelve patients undergoing the modified flap for foot and ankle reconstruction were included in this study between 2014 and 2016. A peroneal-based perforator, a superficial vein, and the vascular axis of the sural nerve were included in the pedicle. A Z-shape skin incision was performed to explore the perforator vessels and a relaying island perforator flap was used to close the donor site. All flaps survived completely without necrosis. The area of the flaps ranged from 16 × 8 cm to 30 × 15 cm. The diameter width of the pedicle ranged from 1.0 to 2.0 cm. A relaying perforator island flap was used in 10 cases for donor site closure and no skin graft was performed. There were no serious donor site complications. All patients were satisfied with the aesthetic outcome postoperatively at the final follow-up. The distally based sural neuro-fasciocutaneous perforator flap is considered a reliable method for foot and ankle reconstruction. The modification for flap pedicle and donor site closure method without skin graft should be recommended. Copyright © 2017. Published by Elsevier Ltd.
Long-term Follow-up and Outcomes in Traumatic Macular Holes.
Miller, John B; Yonekawa, Yoshihiro; Eliott, Dean; Kim, Ivana K; Kim, Leo A; Loewenstein, John I; Sobrin, Lucia; Young, Lucy H; Mukai, Shizuo; Vavvas, Demetrios G
2015-12-01
To review presenting characteristics, clinical course, and long-term visual and anatomic outcomes of patients with traumatic macular holes at a tertiary referral center. Retrospective case series. Twenty-eight consecutive patients with traumatic macular holes at a single tertiary referral center were reviewed. In addition to visual acuities and treatments throughout the clinical course, specific dimensions of the macular hole, including diameters, height, configuration, shape, and the presence of a cuff of fluid, were examined using spectral-domain optical coherence tomography (OCT). Twenty-eight patients were identified with a mean initial visual acuity (VA) of logMAR 1.3 (20/400) and a mean follow-up of 2.2 years. Eleven holes (39.3%) closed spontaneously in median 5.7 weeks. Eleven underwent vitrectomy with a median time to intervention of 35.1 weeks. Median time to surgery for the 5 eyes with successful hole closure was 11.0 weeks vs 56.3 weeks for the 6 eyes that failed to close (P = .02). VA improved in closed holes (P < .01), whether spontaneously (P < .01) or via vitrectomy (P = .04), but VA did not improve in holes that did not close (P = .22). There was no relation between initial OCT dimensions and final hole closure status, although there was a trend, which did not reach statistical significance, toward small dimensions for those that closed spontaneously. A fairly high spontaneous closure rate was observed, with a trend toward smaller OCT dimensions. We found no relationship between hole closure and the OCT characteristics of the hole. Surgical intervention was less successful at hole closure when elected after 3 months. Copyright © 2015 Elsevier Inc. All rights reserved.
Hiebert, John M; Robson, Martin C
2016-01-01
Introduction: Wound debridement is considered essential in chronic wound management. Hypochlorous acid has been shown to be an effective agent in reducing wound bacterial counts in open wounds. Ultrasound-enabled wound debridement is an effective and efficient method of debridement. This study compared ultrasound irrigation with hypochlorous acid versus saline irrigation for wound debridement on pre- and postoperative wounds and determined regrowth of bacteria over 1 week period of time. Finally, the outcome of definitive wound closure of the clinically clean-appearing wounds was recorded. Methods: Seventeen consenting adult patients with chronic open wounds were randomly selected for study. The patients were randomly divided into the hypochlorous acid irrigation or saline irrigation group. All patients provided pre- and postoperative tissue samples for qualitative and quantitative bacteriology. For the time (7 days) between the debridement procedure and the definitive closure procedure, the wounds were dressed with a silver-impregnated dressing and a hydroconductive dressing. Results : Both types of irrigation in the ultrasonic system initially lowered the bacterial counts by 4 to 6 logs. However, by the time of definitive closure, the saline-irrigated wounds had bacterial counts back up to 10 5 whereas the hypochlorous acid-irrigated wounds remained at 10 2 or fewer. More than 80% of patients in the saline group had postoperative closure failure compared with 25% of patients in the hypochlorous acid group. Conclusions: Hypochlorous acid irrigation with ultrasound debridement reduced bacterial growth in chronic open wounds more efficiently than saline alone. Postoperative wound closure outcomes suggest a remarkable reduction in wound complications after wound debridement using hypochlorous acid irrigation with ultrasound versus saline alone.
Fat-plug myringoplasty of ear lobule vs abdominal donor sites.
Acar, Mustafa; Yazıcı, Demet; San, Turhan; Muluk, Nuray Bayar; Cingi, Cemal
2015-04-01
The purpose of this study is to compare the success rates of fat-graft myringoplasties harvesting adipose grafts from different donor sites (ear lobule vs abdomen). The clinical records of 61 patients (24 males and 37 females) who underwent fat-plug myringoplasty (FPM) were reviewed retrospectively. Fat from ear lobule (FEL) and abdominal fat were used as graft materials. The impact of age, gender, systemic diseases, topography of the perforation, utilization of fat graft materials of different origin on the tympanic membrane closure rate and the effect of FPM on hearing gain was analyzed. Our tympanic membrane (TM) closure rate was 82 %. No statistical significant difference was observed regarding age, gender, comorbidities (septal deviation, hypertension and diabetes mellitus) or habits (smoking). Posterior TM perforations had significantly lower healing rate. The change in TM closure rate considering different adipose tissue donor sites was not statistically significant. The hearing gain of the patients was mostly below 20 dB. Fat-plug myringoplasty (FPM) is a safe, cost-effective and easy operation for selected patients. Abdominal fat graft is as effective as ear lobe fat graft on tympanic membrane healing, has cosmetic advantages and should be taken into consideration when planning fat as the graft source.
Fetal omphalocele ratios predict outcomes in prenatally diagnosed omphalocele.
Montero, Freddy J; Simpson, Lynn L; Brady, Paula C; Miller, Russell S
2011-09-01
The objective of the study was to evaluate whether ratios considering omphalocele diameter relative to fetal biometric measurements perform better than giant omphalocele designation at predicting inability to achieve neonatal primary surgical closure. Cases of fetal omphalocele that underwent evaluation between May 2003 and July 2010 were identified. Inclusion was restricted to live births with plan for postnatal repair. Omphalocele diameter upon antenatal ultrasound was compared with abdominal circumference, femur length, and head circumference, yielding the respective omphalocele (O)/abdominal circumference (AC), O/femur length (FL), and O/head circumference (HC) ratios. The absolute measurements were used to classify giant lesions. Omphalocele ratios and giant omphalocele designations were evaluated as predictors of inability to achieve primary repair. Among 25 included cases, staged or delayed closure occurred in 52%. With an optimal cutoff of 0.21 or greater, O/HC best predicted the primary outcome (sensitivity, 84.6%; specificity, 58.3%; odds ratio, 7.7). The O/HC of 0.21 or greater outperformed giant designations. The O/HC of 0.21 or greater best predicted staged or delayed omphalocele closure. Giant omphalocele designation, regardless of definition, poorly predicted outcome. Copyright © 2011 Mosby, Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
..._programs/minerals/mining_projects/pan_mine_project.html . FOR FURTHER INFORMATION CONTACT: Miles Kreidler...: Midway Gold US, Inc. (Midway) proposes to construct and operate an open-pit gold mining operation in the... years, which includes 13 years of mining and additional time for associated construction, closure, and...
1990-07-01
and Wildlife Resources .............................. 3-25 3.3.2 Threatened and Endangered Species ............................. 3-27 3.4 Human ... Human Environment ................................................ 4-10 4.3.1 Archaeological, Cultural, and Historic Resources ................. 4-10...functional safety manager , AFISC, provides Air Force agencies an assessment of their fighting and medical readiness and their resource management
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-04
...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0... fishing closure that was based on an obsolete trigger to prevent unnecessary economic impacts from... of time for comment and allowed an expedient implementation of this final rule. Economic Impacts of...
Case Study of a College that Closed: Saint Mary's College
ERIC Educational Resources Information Center
Brown, Alice W.
2011-01-01
Few colleges choose to close. One that did was Saint Mary's College in Raleigh, North Carolina. Although trustees resisted for a decade, they ultimately made the decision before an anticipated denial of accreditation, allowing the college to control its final days in ways not possible for those who wait until an outside agency forces closure. This…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... 2010, and both the Scallop Committee and the Council's Scientific and Statistical Committee (SSC... during the final development of Amendment 15 as the statistical areas that have high bycatch of YTF in the scallop fishery. For the GB YTF stock, the closure would be in statistical area 562, which extends...
Effects of Worksite Closure on Children's Academic and Psychological Adjustment. Final Report.
ERIC Educational Resources Information Center
Hawaii Univ., Manoa. Center on the Family.
This project examined children's academic performance and psychological well-being in rural communities affected by mass layoffs. In one study (Study A), school level data were compared from similar communities where worksite closing had or had not occurred. Study B explored risk and resiliency processes in a sample of 55 rural Asian Pacific…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-06-27
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...
Building 9401-2 Plating Shop Surveillance and Maintenance Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1999-05-01
This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes,more » and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less
EVA Systems Technology Gaps and Priorities 2017
NASA Technical Reports Server (NTRS)
Johnson, Brian J.; Buffington, Jesse A.
2017-01-01
Performance of Extra-Vehicular Activities (EVA) has been and will continue to be a critical capability for human space flight. Human exploration missions beyond LEO will require EVA capability for either contingency or nominal activities to support mission objectives and reduce mission risk. EVA systems encompass a wide array of products across pressure suits, life support systems, EVA tools and unique spacecraft interface hardware (i.e. EVA Translation Paths and EVA Worksites). In a fiscally limited environment with evolving transportation and habitation options, it is paramount that the EVA community's strategic planning and architecture integration products be reviewed and vetted for traceability between the mission needs far into the future to the known technology and knowledge gaps to the current investments across EVA systems. To ascertain EVA technology and knowledge gaps many things need to be brought together, assessed and analyzed. This includes an understanding of the destination environments, various mission concept of operations, current state of the art of EVA systems, EVA operational lessons learned, and reference advanced capabilities. A combined assessment of these inputs should result in well-defined list of gaps. This list can then be prioritized depending on the mission need dates and time scale of the technology or knowledge gap closure plan. This paper will summarize the current state of EVA related technology and knowledge gaps derived from NASA's Exploration EVA Reference Architecture and Operations Concept products. By linking these products and articulating NASA's approach to strategic development for EVA across all credible destinations an EVA could be done in, the identification of these gaps is then used to illustrate the tactical and strategic planning for the EVA technology development portfolio. Finally, this paper illustrates the various "touch points" with other human exploration risk identification areas including human health and performance.
Sexual Orientation and U.S. Military Personnel Policy: An Update of RAND’s 1993 Study
2010-01-01
Klepinger, “The Sexual Behavior of Men in the United States,” Family Planning Perspectives, Vol. 25, No. 2, 1993, pp. 52–60. Black, D., Gary Gates, Seth ...Kestnbaum, “Professional Closure in the Military Labor Market: A Critique of Pure Cohesion,” in D. M. Snider and G. L. Watkins , eds., The Future of
Base Realignment and Closure (BRAC) Environmental Restoration Program Management Plan
1999-04-01
ENVIRONMENTAL PROGRAM 5 4.1 Environmental Restoration (Cleanup, Compliance and Unexploded Ordnance) 6 4.2 National Environmental Policy Act (NEPA...Realignment Act) to create a process to close bases and realign the force infrastructure. The law addressed National Environmental Policy Act (NEPA...primarily through provisions contained in the National Defense Authorization Acts for Fiscal Years 1992 through 1997. Appendix A of the BRAC Reuse
DOT National Transportation Integrated Search
2007-05-01
This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the...
Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts
1995-09-01
Not Sampled ......... 6 2.3.2 Transformer Sites Sampled ........................ 7 2.4 Soil Sampling Protocol and Analytical Program ...Evaluation (AREE) 66. The study included evaluating the current PCB Transformer Management Program administered by the Fort Devens Environmental Management...Office (EMO), the Fort Devens Spill Contingency Plan, and the ongoing transformer inspection program . Personnel in both the Fort Devens EMO and the Fort
A Comparative History of Department of Defense Management Reform from 1947 to 2005
2006-12-01
type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence
Report on 2005 Defense Base Closure and Realignment Implementation
2011-09-01
been agreed to by the redevelopment authority? Yes Description of redevelopment plan: Education Conveyance to Texarkana College. Quantity of...1993 1998 2008 1995 2014 2014 2002 2016 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024...1996 2001 2008 2008 1990 2008 2008 2008 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024
The Installation Funding Dilemma
2008-04-04
role in supporting the Army’s plans for supporting base realignment and closure (BRAC) requirements, global defense posture realignment ( GDPR ...relation to their affect on installation management funding. First, the initiative known as the GDPR will return many units to the United States from...three initiatives ( GDPR , BRAC and Modularity) and certain other restationing moves, the Army expects a net gain of about 154,000 personnel at its domestic
Installation Management Command: How is the Command Supporting the Army Plan?
2007-03-27
BRAC), Global Defense Posture Realignment ( GDPR ), and Army Modular Force (AMF). IMCOM will continue to consolidate installations functions to free up...This restationing effort resides in three initiatives: Base Realignment and Closure (BRAC), Global Defense Posture Realignment ( GDPR ), and the Army...training on our installations.”36 The GDPR consolidates forces returning from overseas into selected CONUS installations. AMF has restructured the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-09-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
Namrata; Ahmad, Shabi
2015-01-01
Introduction Gastrointestinal fistulas are serious complications and are associated with high morbidity and mortality rates. In majority of the patients, fistulas are treatable. However, the treatment is very complex and often multiple therapies are required. These highly beneficial treatment options which could shorten fistula closure time also result in considerable hospital cost savings. Aim This study was planned to study aetiology, clinical presentation, morbidity and mortality of enterocutaneous fistula and to evaluate the different surgical intervention techniques for closure of enterocutaneous fistula along with a comparative evaluation of different techniques for management of peristomal skin with special emphasis on aluminum paint, Karaya gum (Hollister) and Gum Acacia. Materials and Methods This prospective observational study was conducted in the Department of Surgery, M.L.N. Medical College, Allahabad and its associated hospital (S.R.N. Hospital, Allahabad) for a period of five years. Results Majority of enterocutaneous fistula were of small bowel and medium output fistulas (500-1000 ml/24hours). Most of the patients were treated with conservative treatment as compared to surgical intervention. Large bowel fistula has maximum spontaneous closure rate compare to small bowel and duodenum. Number of orifice whether single or multiple does not appear to play statistically significant role in spontaneous closure of fistula. Serum Albumin is a significantly important predictor of spontaneous fistula closure and mortality. Surgical management appeared to be the treatment of choice in distal bowel fistula. The application of karaya gum (Hollister kit), Gum Acacia and Aluminum Paint gave similar outcome. Conclusion Postoperative fistulas are the most common aetiology of enterocutaneous fistula and various factors do play role in management. Peristomal skin care done with Karaya Gum, Gum Acacia and Aluminum Paint has almost equal efficiency in management of skin excoriation. However, role of Gum Acacia was found to be good with inflamed, excoriated and ulcerative skin in comparison to Aluminum Paint and as efficacious as Karaya Gum but at much lower cost. PMID:26816943
Matsumoto, Masatoshi; Ogawa, Takahiko; Kashima, Saori; Takeuchi, Keisuke
2012-07-23
Frequent and long-term commuting is a requirement for dialysis patients. Accessibility thus affects their quality of lives. In this paper, a new model for accessibility measurement is proposed in which both geographic distance and facility capacity are taken into account. Simulation of closure of rural facilities and that of capacity transfer between urban and rural facilities are conducted to evaluate the impacts of these phenomena on equity of accessibility among dialysis patients. Post code information as of August 2011 of all the 7,374 patients certified by municipalities of Hiroshima prefecture as having first or third grade renal disability were collected. Information on post code and the maximum number of outpatients (capacity) of all the 98 dialysis facilities were also collected. Using geographic information systems, patient commuting times were calculated in two models: one that takes into account road distance (distance model), and the other that takes into account both the road distance and facility capacity (capacity-distance model). Simulations of closures of rural and urban facilities were then conducted. The median commuting time among rural patients was more than twice as long as that among urban patients (15 versus 7 minutes, p<0.001). In the capacity-distance model 36.1% of patients commuted to the facilities which were different from the facilities in the distance model, creating a substantial gap of commuting time between the two models. In the simulation, when five rural public facilitiess were closed, Gini coefficient of commuting times among the patients increased by 16%, indicating a substantial worsening of equity, and the number of patients with commuting times longer than 90 minutes increased by 72 times. In contrast, closure of four urban public facilities with similar capacities did not affect these values. Closures of dialysis facilities in rural areas have a substantially larger impact on equity of commuting times among dialysis patients than closures of urban facilities. The accessibility simulations using the capacity-distance model will provide an analytic framework upon which rational resource distribution policies might be planned.