Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of rulemaking for the amendment to the AP1000 design and the issuance of the amended AP1000 design certification...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0055] Economic Simplified Boiling Water Reactor Standard Design: GE Hitachi Nuclear Energy; Issuance of Final Design Approval The U.S. Nuclear Regulatory Commission has issued a final design approval (FDA) to GE Hitachi Nuclear Energy (GEH) for the economic...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
.../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...
77 FR 20550 - Uniform Criteria for State Observational Surveys of Seat Belt Use
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-05
... in calendar year 2012 to use a survey design that was approved under the old uniform criteria or, at their election, use a survey design approved under the revised uniform criteria. In calendar year 2013, all States must use a survey design approved under the revised uniform criteria. DATES: This final...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... and other associated airport projects are currently undergoing final engineering and design...) has submitted a request to the FAA for approval of the engineering and design refinements that are minor changes to the previously approved project. The ROD and Order approves the engineering and design...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0678; FRL-9903-33-Region-5] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerator Negative Declaration for Designated Facilities and Pollutants: Michigan and Wisconsin AGENCY: Environmental Protection Agency (EPA...
76 FR 21940 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... improvements, guard-rail, cul-de-sacs, and a potential levee) made necessary based on final design that were... necessary based on final design that were not analyzed in the Tier 2 Section 1 ROD or FEIS (approved... easements, and revised right-of-way to even station and offset) made necessary based on final design that...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-14
... the Aberdeen Regional Airport for current and projected levels of aviation by the design aircraft... wildlife habitat. The selected alternative includes the: (I.) Unconditional approval of the Airport Layout... eligible items. (4.) Approval of design and use of air traffic procedures needed to implement the proposed...
2015-12-21
SECURITY CLASSIFICATION OF: The overall goal of this project is to determine how electrode surface chemistry can be rationally designed to decrease...2015 Approved for Public Release; Distribution Unlimited Final Report: Rational Design of Anode Surface Chemistry in Microbial Fuel Cells for...ABSTRACT Final Report: Rational Design of Anode Surface Chemistry in Microbial Fuel Cells for Improved Exoelectrogen Attachment and Electron Transfer
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
49 CFR 611.7 - Relation to planning and project development processes.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Preliminary Engineering. Consistent with 49 USC 5309(e)(6) and 5328(a)(2), FTA will approve/disapprove entry... rating of “recommended” to be approved for entry into preliminary engineering. (4) This part does not in... 5328(a)(3), FTA will approve/disapprove entry of a proposed project into final design within 120 days...
Organic Photovoltaic Multiferroics
2016-01-14
Aug-2014 31-Jul-2017 Approved for Public Release; Distribution Unlimited Final Report: ARO-YIP (Materials By Design): Organic Photovoltaic ...Research Office P.O. Box 12211 Research Triangle Park, NC 27709-2211 Materials design, self-assembly, magnetoelectrics, photovoltaics REPORT...7552 31-Jul-2017 ABSTRACT Final Report: ARO-YIP (Materials By Design): Organic Photovoltaic Multiferroics Report Title In this project, we aim at
Wise, P.; Drury, M.
1996-01-01
OBJECTIVE: To assess the outcome of 100 general practice based, multicentre research projects submitted to the ethics committee of the Royal College of General Practitioners by pharmaceutical companies or their agents between 1984 and 1989. DESIGN: Analysis of consecutive submitted protocols for stated objectives, study design, and outcomes; detailed review of committee minutes and correspondence in relation to amendment and approval; assessment of final reports submitted at conclusion of studies. SUBJECTS: 82 finally approved protocols, embracing 34,523 proposed trial subjects and 1195 proposed general practice investigators. MAIN OUTCOME MEASURES: Success at enrolling subjects and investigators; commencement and completion data; validity of final report's assessment of efficacy, safety, tolerability, and acceptability; and method of use and dissemination of findings. RESULTS: 18 studies were not approved and 45 had to be amended. Randomised controlled trials comprised 46 of the original submissions. Remuneration considerations, inadequate information or consent sheets, pregnancy safety, the need to discontinue existing therapy, and suboptimal scientific content were major reasons for rejecting studies or asking for amendments. Of the 82 approved studies 8 were not started. Shortfalls of investigators (of 39%) and trial subjects (of 37%) and an overall 23% withdrawal rate were responsible for a significant incidence of inconclusive results. Within the six year follow up interval, only 19 of the studies had been formally published. CONCLUSIONS: This audit identified substantial ethical concerns in the process of approving multicentre general practice pharmaceutical research. PMID:8939118
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... Ambient Air Quality Standard (NAAQS) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... of the 1997 8-hour ozone NAAQS as of the applicable date. DATES: Effective Date: This final rule will... action is EPA taking in this final rule? II. What is the background for this final action? III. What was...
ERIC Educational Resources Information Center
Lane Community Coll., Eugene, OR.
A final report and final evaluation report of Phase III are provided for a project to establish a national clearinghouse for apprenticeship-related instructional materials. The final report provides a summary and a narrative account of these project activities: identification of materials; identification of apprenticeship curriculum needs;…
76 FR 17019 - List of Approved Spent Fuel Storage Casks: HI-STORM Flood/Wind Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Storage Casks: HI-STORM Flood/Wind Addition AGENCY: Nuclear Regulatory Commission. ACTION: Direct final... regulations to add the HI-STORM Flood/Wind cask system to the ``List of Approved Spent Fuel Storage Casks... cask designs. Discussion This rule will add the Holtec HI-STORM Flood/Wind (FW) cask system to the list...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... approve a request from the State of Texas to redesignate the Beaumont/Port Arthur (BPA) Texas ozone... making a final determination that the BPA nonattainment area has attained the 1997 8- hour ozone NAAQS... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... infiltration and erosion. The regulation requires final cover systems to be designed and constructed to: (1... infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum of 18 inches... that includes: (1) An infiltration layer that achieves an equivalent reduction in infiltration as the...
An Analysis of the Effectiveness of First Article Testing and Approval Requirements
1976-12-01
EFFECTIVENESS OF FIRST ARTICLE TESTING AND ^APPROVAL REQUIREMENTS •>’r\\ a /’ j/’? by Harold F./fandy J / " / Robert Äaüner^jwifc II d ’^au...covered by design specifications. c - ASPR Criteria. Finally, there are several additional cir- cumstances cited in ASPR 1-1902 when the Government’s...select the alternate provision contained in ASPR 7-104.55( c ) which authorizes the contractor, upon written approval by the contracting officer, to
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
... demonstration showing how the area will continue to attain the 24-hour PM 10 NAAQS for at least 10 years beyond...; California; South Coast Air Basin; Approval of PM 10 Maintenance Plan and Redesignation to Attainment for the PM 10 Standard AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is...
DOT National Transportation Integrated Search
2016-07-01
A research project to investigate the product approval, design process, and ongoing product evaluation of erosion control blankets : (ECBs) for the Missouri Department of Transportation (MoDOT) was conducted. An overview of federal and state environm...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...
10 CFR 50.37 - Agreement limiting access to Classified Information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-20
... Administration: Continuation of FHA Reform; Strengthening Risk Management Through Responsible FHA-Approved...) that are designed to strengthen FHA by improving its management of risk. This final rule increases the... designed to enhance FHA's risk management functions. The announcement preceded completion of an independent...
30 CFR 18.61 - Final inspection of complete machine.
Code of Federal Regulations, 2011 CFR
2011-07-01
... substantially modified design of a previously approved one shall be inspected by a qualified representative(s... requirements of this part with respect to joints, lead entrances, and other pertinent features. (2) Wiring...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
... Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan for Designated.... SUMMARY: EPA is taking direct final action to approve Illinois' negative declaration and request for EPA..., the state may submit a letter of certification to that effect, or a negative declaration, in lieu of a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL... high quality research within designated National Estuarine Research Reserves, NOAA may provide... with approved final management plans. Although research may be conducted within the immediate watershed...
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL... high quality research within designated National Estuarine Research Reserves, NOAA may provide... with approved final management plans. Although research may be conducted within the immediate watershed...
Canister Design for Deep Borehole Disposal of Nuclear Waste
2006-05-01
radioactive waste disposal (not yet released) Fortunately, transportation casks for spent fuel have already been approved, built, and used as...would allow use of the current designs for transportation casks ; or, place the fuel assemblies into the final disposal canisters 21 prior to transport ...16 Figure 1-5. Typical Spent Fuel Transportation Casks
Design and Testing of a Thermostable Platform for Multimerization of Single Domain Antibodies
2012-08-01
1 DESIGN AND TESTING OF A THERMOSTABLE PLATFORM FOR MULTIMERIZATION OF SINGLE DOMAIN ANTIBODIES ECBC-TR...Army position unless so designated by other authorizing documents. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public...ADDRESS. 1. REPORT DATE (DD-MM-YYYY) XX-08-2012 2. REPORT TYPE Final 3. DATES COVERED (From - To) Oct 2008 - Sep 2010 4. TITLE AND SUBTITLE Design
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
... Global Atmosphere Section, Air Toxics and Assessment Branch (AT-18J), U.S. Environmental Protection... and Global Atmosphere Section, Air Toxics and Assessment Branch (AT-18J), U.S. Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
...EPA is proposing to approve, as a revision of the California state implementation plan, the State's request to redesignate the Sacramento nonattainment area to attainment for the 24-hour particulate matter of ten microns or less (PM10) National Ambient Air Quality Standard (NAAQS). EPA is also proposing to approve the PM10 maintenance plan and the associated motor vehicle emissions budgets for use in transportation conformity determinations necessary for the Sacramento area. Finally, EPA is proposing to approve the attainment year emissions inventory. EPA is proposing these actions because the SIP revision meets the requirements of the Clean Air Act and EPA guidance for such plans and motor vehicle emissions budgets.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
...) 886-6030. 4. Mail: Carlton T. Nash, Chief, Toxics and Global Atmosphere Section, Air Toxics and..., Illinois 60604. 5. Hand Delivery: Carlton T. Nash, Chief, Toxics and Global Atmosphere Section, Air Toxics...
Modeling of Ultrafast Laser Induced Electron Emission from TI and Graphene
2017-09-08
and Design Final Report 09/08/2017 DISTRIBUTION A: Distribution approved for public release. AF Office Of Scientific Research (AFOSR)/ IOA Arlington... Design 287 GHIM MOH ROAD Singapore, 279623 SG 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) AOARD...of Technology and Design - Mailing Address : 8 Somapah Road, Singapore 487372 - Phone : (65) 6499 4558 - Fax : NIL Period of Performance: 16
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... maintenance plan to the year 2025 and updating the sub-area motor vehicle emission budgets (MVEBs) for... taking? III. Why is EPA taking these actions? IV. What are the effects of these actions? V. Final Action... design values Location County Monitor ID 2008 2009 2010 2008-2010 Lincoln County Replacing Iron Station...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... quality monitoring data for the 2007-2009 ozone seasons that demonstrate that the 8-hour ozone NAAQS has... technical information and/or data that you used. 5. If you estimate potential costs or burdens, explain how... FR 23857), EPA published a final rule designating and classifying areas under the 8-hour ozone NAAQS...
77 FR 55105 - Aging Airplane Program: Widespread Fatigue Damage; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... final rule published November 15, 2010. The final rule required design approval holders of certain... compliance dates of Sec. Sec. 26.21, 121.1115, and 129.115 for Airbus A310 and A300-600 series airplanes... A300 B4-203 30 34,000 FC A300-600 Series 60 30,000 FC/67,500 FH A310-200 Series 60 40,000 FC/60,000 FH...
Limited Scope Design Study for Multi-Sensor Towbody
2016-06-01
FINAL REPORT Limited Scope Design Study for Multi-Sensor Towbody SERDP Project MR-2501 JUNE 2016 Dr. Kevin Williams Tim McGinnis...prepared under contract to the Department of Defense Strategic Environmental Research and Development Program (SERDP). The publication of this...Left Blank REPORT DOCUMENTATION PAGE Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
.... 139(l)(1). The I-75 Express Lanes Project will design a managed lane system along I-75 from the SR 155..., permits and approvals for the project. DATES: By this notice, the FHWA is advising the public of the final... action on the highway project will be barred unless the claim is filed on or before December 2, 2013. If...
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
2014-09-01
elements of functional structure. Frequently the requirement for this is to ensure long- term retention of skilled people through the provision of an...operational and manufacturable, greatly reducing the design work remaining for Milestone C. 14. SUBJECT TERMS System Architecture, manufacturing...specialized ammunition technology item such as a fuze takes too long, from initial concept through final production design, which is approved for
Focused Feasibility Study Final Field Sampling Plan
1993-10-01
baseline of groundwater chemistry prior to commencing additional environmental investigations of the area. Work for Phase I of the FFS is designed lo...investigations and remedial feasibility investigations at Beach Point. The groundwater data will also be used to aid in the design of any groundwater extraction...approved laboratories. The analytical data will be the equivalent of EPA Level IV data. This level of data quality has been established for environmental
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... portions that reflect approval of eight new animal drug applications. The final rule inadvertently failed... approval of eight new animal drug applications. The final rule inadvertently failed to add conforming...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
...). ACTION: Final rule. SUMMARY: EPA is finalizing approval of California's Airborne Toxic Control Measure... (75 FR 61662), EPA proposed to approve California's Airborne Toxic Control Measure for Emissions of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
Cluster Dynamics: Laying the Foundation for Tailoring the Design of Cluster ASSE
2016-02-25
UNIVERSITY 201 OLD MAIN UNIVERSITY PARK, PA 16802-1505 02/25/2016 Final Report DISTRIBUTION A: Distribution approved for public release. Air Force...5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) PENNSYLVANIA STATE UNIVERSITY 201 OLD MAIN UNIVERSITY PARK, PA 16802-1505 US 8
The Early Childhood Community Gives Back: Exchange Center Makeover Project
ERIC Educational Resources Information Center
Exchange: The Early Childhood Leaders' Magazine Since 1978, 2010
2010-01-01
The excitement, joy, and big smiles still permeate Jewel's Learning Center since the surprise announcement in June. Over the past several months the Makeover partners have been busy working with Miss Charlotte, Miss Jewel, and staff to create design plans necessary for final approval. Charlotte, with the help of Collaborative for Children and…
Evaluation of New Texas Charter Schools: Final Report (2007-10)
ERIC Educational Resources Information Center
Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine
2011-01-01
Since 1994, the U.S. Department of Education (USDE) has provided funding to new charter schools through Charter School Program (CSP) grants designed to provide support for the planning and implementation of effective new charter programs. Grants are awarded to state education agencies, which then provide funding to approved charter schools through…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... Attainment for the 2008 Lead Standard AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... area has attained the 2008 lead (Pb) national ambient air quality standards (NAAQS or standard). In... of designations for the 2008 Lead NAAQS on November 22, 2011. See 76 FR 72097. No additional areas in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
... conditional approval of portions of OAC rule 3745-21-09. You can learn more information about the rule...). ACTION: Final rule. SUMMARY: Under section 110(k)(3) of the Clean Air Act (CAA), EPA is disapproving an...) of the CAA, we are also conditionally approving a revision of paragraph (BBB)(1) of OAC 3745-21-09...
Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals
2000-04-01
formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate
Summary of the EMA Joint Regulators/Industry QbD workshop (London, UK; 28-29 January 2014).
Cook, Graham; France, Georges; Holte, Øyvind; Lorenti, Giampiero; Tainsh, David
2016-01-01
This paper summarizes the discussions and insights gained from the key themes that emerged during the Quality by Design (QbD) Workshop held at the European Medicines Agency (EMA) offices in London, UK, on 28-29 January 2014. Industry and regulators shared practical experiences from six case studies (five approved small molecule products and one phase 3 biotechnological product) based on QbD submissions by five companies (AstraZeneca, GlaxoSmithKline, Novartis, NovoNordisk, and Pfizer).The case studies covered a range of different development, regulatory submission, and post-approval aspects of QbD and were developed through confidential discussions between the company representatives and regulators. Key themes that emerged from the workshop discussions were: 1. presentation of information in submissions (development story and the presentation of information in marketing authorization applications; risk assessment and criticality); 2. development aspects (design space; use of models; control strategy); and 3. post-approval aspects (lifecycle management; dossier-quality system interactions; handling of deviations). Many aspects of QbD for biotechnological products are similar to small molecules, but there are some important differences highlighted in this paper.The final section of the paper discusses some proposals for future developments to address the issues that were identified. This paper summarizes the discussions and insights gained from the key themes that emerged during the Quality by Design (QbD) Workshop held at the European Medicines Agency offices in London, UK, on 28-29 January 2014. Industry and regulators shared practical experiences from six case studies (five approved small-molecule products and one phase 3 biotechnological product) based on QbD submissions by five companies (AstraZeneca, GlaxoSmithKline, Novartis, NovoNordisk, and Pfizer).The case studies covered a range of different development, regulatory submission, and post-approval aspects of QbD and were developed through confidential discussions between the company representatives and regulators. Key themes that emerged from the workshop discussions were: 1. presentation of information in submissions (development story and the presentation of information in marketing authorization applications; risk assessment and criticality); 2. development aspects (design space; use of models; control strategy); and 3. post-approval aspects (lifecycle management; dossier-quality system interactions; handling of deviations). Many aspects of QbD for biotechnological products are similar to small molecules, but there are some important differences highlighted in this paper.The final section of the paper discusses some proposals for future developments to address the issues that were identified. © PDA, Inc. 2016.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... instructions for submitting comments. B. Email: cox[email protected] . C. Mail: EPA-R03-OAR-2011-0848, Kathleen Cox, Associate Director, Office of Air Permits and Toxics, Mailcode 3AP10, U.S. Environmental... the State of West Virginia's HMIWI plan revision submittal as a direct final rule without prior...
2012-03-01
4 Body ...Final Report requirement. 5 Body The approved Statement of Work proposed the following timeline (Table 1): Table 1. Timeline for...prosthesis designs (Figure 1) were tested for this project including the 1E90 Sprinter (OttoBock Inc.), Flex-Run (Ossur), Cheetah ® (Ossur) and Nitro
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
... solid waste (MSW). DATES: This direct final rule is effective February 28, 2011 without further notice... requires EPA to conduct a 5-year review of the solid waste incinerator new source performance standards........... Okahumpka. Pasco County Solid Waste Hudson. Hillsborough County Resource Recovery Tampa. McKay Bay Refuse-to...
10 CFR 52.147 - Duration of design approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Duration of design approval. 52.147 Section 52.147 Energy... Standard Design Approvals § 52.147 Duration of design approval. A standard design approval issued under this subpart is valid for 15 years from the date of issuance and may not be renewed. A design approval...
5 CFR 470.311 - Final project approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...EPA proposes to approve State Implementation Plan (SIP) revisions submitted by the Maryland Department of the Environment (MDE). These revisions approve specific provisions of a 2011 Consent Decree between MDE and GenOn to reduce particulate matter (PM), sulfur oxides (SOX), and nitrogen oxides (NOX) from the GenOn Chalk Point generating station (Chalk Point). These revisions also remove the 1978 and 1979 Consent Orders for the Chalk Point generating station from the Maryland SIP as those Consent Orders have been superseded by the 2011 Consent Decree. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
5 CFR 470.311 - Final project approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...
EPA is taking final action to approve a revision to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California SIP concerning YSAQMD regarding RACT)requirements the 1997 8-hour ozone NAAQS and approve negative declarations into SIP.
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
...-based assessment approaches and quality by design principles. These efforts will also be considered part... processes being referenced. DATES: Although you can comment on any guidance at any time (see 21 CFR 10.115(g... on the final version of the guidance and on any other part of the SUPAC guidance series, submit...
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND... submit a final control plan according to the schedule in table 1 of this subpart and comply with § 62...) Calculations of the current maximum combustion capacity and the planned maximum combustion capacity after the...
Design of an Orbital Inspection Satellite
1986-12-01
ADDRESS (City, State, and ZIP Code ) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNITELEMENT NO. NO. NO. CCESSION NO. 11. TITLE (include...Captain, USAF Dh t ibutioni Availabiity Codes Avail adlor Dist [Special December 1986 Approved for public release; distribution...lends itself to the technique of multi -objective analysis. The final step is planning for action. This communicates the entire systems engineering
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
... continued comprehensive protection of Washington's coastal resources. OCRM did not select either Alternative... Record of Decision and Final Findings of Approvability to the Washington Coastal Zone Management Program... and Coastal Resource Management. ACTION: Notice of Availability or Record of Decision and Final...
23 CFR 1340.11 - Post-approval alterations to survey design.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Post-approval alterations to survey design. 1340.11... Post-approval alterations to survey design. After NHTSA approval of a survey design, States shall submit for NHTSA approval any proposed alteration to their survey design, including, but not limited to...
23 CFR 1340.11 - Post-approval alterations to survey design.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Post-approval alterations to survey design. 1340.11... Post-approval alterations to survey design. After NHTSA approval of a survey design, States shall submit for NHTSA approval any proposed alteration to their survey design, including, but not limited to...
23 CFR 1340.11 - Post-approval alterations to survey design.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Post-approval alterations to survey design. 1340.11... Post-approval alterations to survey design. After NHTSA approval of a survey design, States shall submit for NHTSA approval any proposed alteration to their survey design, including, but not limited to...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2014 CFR
2014-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2012 CFR
2012-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
A Critical Review of Available Retrievable Inferior Vena Cava Filters and Future Directions
Montgomery, Jennifer P.; Kaufman, John A.
2016-01-01
Inferior vena cava filters have been placed in patients for decades for protection against pulmonary embolism. The widespread use of filters has dramatically increased owing at least in part to the approval of retrievable vena cava filters. Retrievable filters have the potential to protect against pulmonary embolism and then be retrieved once no longer needed to avoid potential long-term complications. There are several retrievable vena cava filters available for use. This article discusses the different filter designs as well as the published data on these available filters. When selecting a filter for use, it is important to consider the potential short-term complications and the filters' window for retrieval. Understanding potential long-term complications is also critical, as these devices are approved for permanent placement and many filters are not retrieved. Finally, this article will address research into new designs that may be the future of vena cava filtration. PMID:27247475
A Critical Review of Available Retrievable Inferior Vena Cava Filters and Future Directions.
Montgomery, Jennifer P; Kaufman, John A
2016-06-01
Inferior vena cava filters have been placed in patients for decades for protection against pulmonary embolism. The widespread use of filters has dramatically increased owing at least in part to the approval of retrievable vena cava filters. Retrievable filters have the potential to protect against pulmonary embolism and then be retrieved once no longer needed to avoid potential long-term complications. There are several retrievable vena cava filters available for use. This article discusses the different filter designs as well as the published data on these available filters. When selecting a filter for use, it is important to consider the potential short-term complications and the filters' window for retrieval. Understanding potential long-term complications is also critical, as these devices are approved for permanent placement and many filters are not retrieved. Finally, this article will address research into new designs that may be the future of vena cava filtration.
Molecular Epidemiology Investigation of Obesity and Lethal Prostate Cancer
2017-01-01
Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public...as an official Department of the Army position, policy or decision unless so designated by other documentation. 2 REPORT DOCUMENTATION PAGE Form...S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION
Role of Caveolin-1 in Prostate Cancer Angiogenesis
2009-12-01
REPORT DATE: December 2009 TYPE OF REPORT : FINAL PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick...views, opinions and/or findings contained in this report are those of the author(s) and should not be construed as an official Department of the Army...position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-05
... requirement'' for the Phoenix area under our final rule implementing the 8-hour ozone NAAQS (see 40 CFR 51.900(f) and 51.905(a)(1)) based on the designation of that area as a nonattainment area for the 8-hour... and, for the Phoenix area with respect to ozone, the enhanced performance standard in 40 CFR 51.351...
Helicopter Dynamic Performance Program. Volume 2. User’s Manual
1980-07-01
Technologies Corporation Stratford, Connecticut 06602 July 1980 Final Report / • ., . Approved for public release; I distribution unlimited. ; A - Prepared...for : APPLIED TECHNOLOGY LABORATORY U. S. ARMY RESEARCH AND TECHNOLOGY LABORATORIES (AVRADCOM) Fort Eustis, Va. 23604 80 8 27 D APPLIED TECHNOLOGY ... Technology Division. Technic31 review of this report was also pro- vided by Messrs. W_ A. Pleasants of Design Integration and Analysis Technical Area
Deciphering the Adaptive Immune Response to Ovarian Cancer
2015-12-01
REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved...be construed as an official Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION...person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control
Northrop Triga facility decommissioning plan versus actual results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gardner, F.W.
1986-01-01
This paper compares the Triga facility decontamination and decommissioning plan to the actual results and discusses key areas where operational activities were impacted upon by the final US Nuclear Regulatory Commission (NRC)-approved decontamination and decommissioning plan. Total exposures for fuel transfer were a factor of 4 less than planned. The design of the Triga reactor components allowed the majority of the components to be unconditionally released.
NASA Technical Reports Server (NTRS)
Wingo, Dennis
1997-01-01
The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.
Anselmo, Aaron C.
2016-01-01
Abstract Nanoparticle/microparticle‐based drug delivery systems for systemic (i.e., intravenous) applications have significant advantages over their nonformulated and free drug counterparts. For example, nanoparticle systems are capable of delivering therapeutics and treating areas of the body that other delivery systems cannot reach. As such, nanoparticle drug delivery and imaging systems are one of the most investigated systems in preclinical and clinical settings. Here, we will highlight the diversity of nanoparticle types, the key advantages these systems have over their free drug counterparts, and discuss their overall potential in influencing clinical care. In particular, we will focus on current clinical trials for nanoparticle formulations that have yet to be clinically approved. Additional emphasis will be on clinically approved nanoparticle systems, both for their currently approved indications and their use in active clinical trials. Finally, we will discuss many of the often overlooked biological, technological, and study design challenges that impact the clinical success of nanoparticle delivery systems. PMID:29313004
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 6 2013-10-01 2013-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 6 2014-10-01 2014-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 6 2012-10-01 2012-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 6 2011-10-01 2011-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.
49 CFR 451.14 - Alternative approval of new containers by design type.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.14 Alternative approval of new containers by design type. (a) New... 49 Transportation 6 2010-10-01 2010-10-01 false Alternative approval of new containers by design...
49 CFR 451.14 - Alternative approval of new containers by design type.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.14 Alternative approval of new containers by design type. (a) New... 49 Transportation 6 2013-10-01 2013-10-01 false Alternative approval of new containers by design...
49 CFR 451.14 - Alternative approval of new containers by design type.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.14 Alternative approval of new containers by design type. (a) New... 49 Transportation 6 2012-10-01 2012-10-01 false Alternative approval of new containers by design...
49 CFR 451.14 - Alternative approval of new containers by design type.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.14 Alternative approval of new containers by design type. (a) New... 49 Transportation 6 2014-10-01 2014-10-01 false Alternative approval of new containers by design...
49 CFR 451.14 - Alternative approval of new containers by design type.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.14 Alternative approval of new containers by design type. (a) New... 49 Transportation 6 2011-10-01 2011-10-01 false Alternative approval of new containers by design...
Final Approval of California Air Plan Revision; Mobile Source Regulations
EPA is taking final action to approve a submittal by California to revise its SIP regulations establishing standards and requirements relating to the control of emissions from new and in-use ond and off-road vehicles and engines..
Design requirements for plasma facing materials in ITER
NASA Astrophysics Data System (ADS)
Matera, R.; Federici, G.; ITER Joint Central Team
1996-10-01
After the official approval of the Interim Design Report, the ITER project enters the final phase of the EDA. With the definition of the design requirements of the high heat flux components, the structural and armor materials' working domain is better specified, allowing to focus the R & D program on the most critical issues and to orient the design of divertor and first wall components towards those concepts which potentially have a better chance to withstand normal and off-normal operating conditions. Among the latter, slow, high-power, high recycling transient are at present driving the design of high heat flux components. Examples of possible design solution under experimental validation in the R & D program are presented and discussed in this paper.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false How must design and production approval... REGULATIONS PROTECTION OF VOLUNTARILY SUBMITTED INFORMATION § 193.17 How must design and production approval... under § 193.9(a)(2) to the holders of design approvals of production approvals issued by the FAA, the...
Integrative Lifecourse and Genetic Analysis of Military Working Dogs
2013-10-01
Working Dogs 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-11-2-0225 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) C. Guillermo Couto, DVM, Diplomate...protocol for the collection of biological samples and Lackland veterinary approval was granted ; and final Lackland AFB oversight approval was granted and...those documents were submitted to DoD CDMRP grant administration. Currently, there is one final approval from ACURO pending (and expected
2018-03-01
Advancement of Military Medicine, Inc. Bethesda, MD 20817 REPORT DATE: March 2018 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research ...position, policy or decision unless so designated by other documentation. 2 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...REPORT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Research Institute
Towards a Possible Therapy for Diabetes Complications
2016-03-01
official Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved...NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE March 2016 2. REPORT TYPE Addendum to Final 3. DATES COVERED 28 Sept 2014 - 31 Dec 2015...Unclassified b. ABSTRACT Unclassified c. THIS PAGE Unclassified UU 13 19b. TELEPHONE NUMBER (include area code) Standard Form 298 (Rev. 8-98
Super p53 for Treatment of Ovarian Cancer
2017-09-01
City, UT 84112 CONTRACTING ORGANIZATION: Salt Lake REPORT DATE: September 2017 TYPE OF REPORT : Final PREPARED FOR: U.S. Army Medical Research...views, opinions and/or findings contained in this report are those of the author(s) and should not be construed as an official Department of the Army...position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Szilard, Ronaldo Henriques; Youngblood, Robert; Frepoli, Cesare
2015-04-01
The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the LOCA/ECCS acceptance criteria to include the effects of higher burnup on cladding performance as well as to address some other issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in the summer of 2016. The impact of the final 50.46c rule on the industry will involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or reanalyses and associated technical specification revisions for NRC review andmore » approval. The rule implementation process, both industry and NRC activities, is expected to take 5-10 years following the rule effective date. The need to use advanced cladding designs is expected. A loss of operational margin will result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-28
...We, the U.S. Fish and Wildlife Service, designate critical habitat for the southern Selkirk Mountains population of woodland caribou (Rangifer tarandus caribou) under the Endangered Species Act. In total, approximately 30,010 acres (12,145 hectares) is being designated as critical habitat. The critical habitat is located in Boundary County, Idaho, and Pend Oreille County, Washington. We are finalizing this action in compliance with our obligation under the Act and in compliance with a court-approved settlement agreement. The effect of this regulation is to conserve the habitat essential to the southern Selkirk Mountains population of woodland caribou.
23 CFR 1340.10 - Submission and approval of seat belt survey design.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Submission and approval of seat belt survey design. 1340... § 1340.10 Submission and approval of seat belt survey design. (a) Contents: The following information shall be included in the State's seat belt survey design submitted for NHTSA approval: (1) Sample design...
23 CFR 1340.10 - Submission and approval of seat belt survey design.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Submission and approval of seat belt survey design. 1340... § 1340.10 Submission and approval of seat belt survey design. (a) Contents: The following information shall be included in the State's seat belt survey design submitted for NHTSA approval: (1) Sample design...
23 CFR 1340.10 - Submission and approval of seat belt survey design.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Submission and approval of seat belt survey design. 1340... § 1340.10 Submission and approval of seat belt survey design. (a) Contents: The following information shall be included in the State's seat belt survey design submitted for NHTSA approval: (1) Sample design...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [CMS-3285-FN] Medicare and Medicaid Programs; Continued Approval of American Osteopathic Association/Healthcare... Medicare & Medicaid Services, HHS. ACTION: Final notice. SUMMARY: This final notice announces our decision...
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.
29 CFR 1952.313 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
Design Validation Methodology Development for an Aircraft Sensor Deployment System
NASA Astrophysics Data System (ADS)
Wowczuk, Zenovy S.
The OCULUS 1.0 Sensor Deployment concept design, was developed in 2004 at West Virginia University (WVU), outlined the general concept of a deployment system to be used on a C-130 aircraft. As a sequel, a new system, OCULUS 1.1, has been developed and designed. The new system transfers the concept system design to a safety of flight design, and also enhanced to a pre-production system to be used as the test bed to gain full military certification approval. The OCULUS 1.1 system has an implemented standard deployment system/procedure to go along with a design suited for military certification and implementation. This design process included analysis of the system's critical components and the generation of a critical component holistic model to be used as an analysis tool for future payload modification made to the system. Following the completion of the OCULUS 1.1 design, preparations and procedures for obtaining military airworthiness certification are described. The airworthiness process includes working with the agency overseeing all modifications to the normal operating procedures made to military C-130 aircraft and preparing the system for an experimental flight test. The critical steps in his process include developing a complete documentation package that details the analysis performed on the OCULUS 1.1 system and also the design of experiment flight test plan to analyze the system. Following the approval of the documentation and design of experiment an experimental flight test of the OCULUS 1.1 system was performed to verify the safety and airworthiness of the system. This test proved successfully that the OCULUS 1.1 system design was airworthy and approved for military use. The OCULUS 1.1 deployment system offers an open architecture design that is ideal for use as a sensor testing platform for developmental airborne sensors. The system's patented deployment methodology presents a simplistic approach to reaching the systems final operating position which offers the most robust field of view area of rear ramp deployment systems.
7 CFR 1737.51 - Approval of loan design.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Approval of loan design. 1737.51 Section 1737.51... of Application Procedures § 1737.51 Approval of loan design. RUS shall notify the borrower when the preloan data concerning the system design and costs and subscriber projections have been approved. If...
EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9099-3] Cross-Media Electronic Reporting Rule State Approved...). ACTION: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 1 2012-01-01 2012-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
7 CFR 22.308 - Project approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 1 2011-01-01 2011-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...
46 CFR 160.076-17 - Approval of design or material changes.
Code of Federal Regulations, 2010 CFR
2010-10-01
... approval before changing PFD production methods. (b) Determinations of equivalence of design, construction... 46 Shipping 6 2010-10-01 2010-10-01 false Approval of design or material changes. 160.076-17... Flotation Devices § 160.076-17 Approval of design or material changes. (a) The manufacturer must submit any...
Design review report for the SY-101 RAPID mitigation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHLOSSER, R.L.
1999-05-24
This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitigation System. As part of the SY-101 Surface-Level-Rise Remediation Project, the SY-101 WID Mitigation System will reduce the potential unacceptable consequences of crust growth in Tank 241-SY-101 (SY-101). Projections of the crust growth rate indicate that the waste level in the tank may reach the juncture of the primary and secondary confinement structures of the tank late in 1999. Because of this time constraint, many design activities are being conducted in parallel and design reviews were conducted for system adequacy as well as design implementationmore » throughout the process. Design implementation, as used in this design review report, is the final component selection (e.g., which circuit breaker, valve, or thermocouple) that meets the approved design requirements, system design, and design and procurement specifications. Design implementation includes the necessary analysis, testing, verification, and qualification to demonstrate compliance with the system design and design requirements. Design implementation is outside the scope of this design review. The design activities performed prior to detailed design implementation (i.e., system mission requirements, functional design requirements, technical criteria, system conceptual design, and where design and build contracts were placed, the procurement specification) have been reviewed and are within the scope of this design review report. Detailed design implementation will be controlled, reviewed, and where appropriate, approved in accordance with Tank Waste Remediation System (TWRS) engineering procedures. Review of detailed design implementation will continue until all components necessary to perform the transfer function are installed and tested.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... Projects has prepared an Final Environmental Assessment (FEA) for an application filed by the Penobscot... Comprehensive Settlement Agreement. The FEA evaluates the environmental impacts that would result from approving the licensee's proposed surrenders. The FEA finds that approval of the application would not...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...
13 CFR 108.380 - Final approval as a NMVC Company.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Final approval as a NMVC Company. 108.380 Section 108.380 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS... amount of matching resources for its Operational Assistance grant award set forth in its application...
EPA is taking final action to approve a revision to the Antelope Valley Air Quality Management District (AVAQMD) portion of the California SIP concerning the emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.
9 CFR 317.4 - Labeling approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Devices, except for generically approved labeling authorized for use in § 317.5(b). The management of the... indication of final color, as specified in § 317.2. FSIS will accept sketches that are hand drawn, computer generated or other reasonable facsimiles that clearly reflect and project the final version of the labeling...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Retrofit Technology Requirements for Eastman Chemical Company AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of the Best Available Retrofit Technology (BART... retrofitting its facility pursuant to the BART determination for SO 2 emissions (hereafter referred to as the...
18 CFR 300.21 - Final confirmation and approval.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Final confirmation and approval. 300.21 Section 300.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... reasonable number of years after first meeting the Administrator's other costs. (ii) The rates must be based...
18 CFR 300.21 - Final confirmation and approval.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Final confirmation and approval. 300.21 Section 300.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... reasonable number of years after first meeting the Administrator's other costs. (ii) The rates must be based...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... Aircraft Registration; OMB Approval of Information Collection AGENCY: Federal Aviation Administration, DOT... final rule, ``Re-Registration and Renewal of Aircraft Registration,'' which was published on July 20..., the FAA published the final rule, ``Re-Registration and Renewal of Aircraft Registration'' (75 FR...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
...EPA is taking final action to approve a revision to the California State Implementation Plan (SIP) submitted by the California Air Resources Board (CARB or Board). This revision concerns two regulations that reduce emissions of diesel particulate matter (PM), oxides of nitrogen (NOX), and other pollutants from in-use, heavy-duty diesel-fueled trucks and buses, and drayage trucks. EPA is approving this SIP revision because the Agency has determined that the regulations are consistent with the relevant Clean Air Act requirements, policies and guidance. Final approval of the two regulations and incorporation of them into the California SIP makes them federally enforceable.
Developments in the safe design of LNG tanks
NASA Astrophysics Data System (ADS)
Fulford, N. J.; Slatter, M. D.
The objective of this paper is to discuss how the gradual development of design concepts for liquefied natural gas (LNG) storage systems has helped to enhance storage safety and economy. The experience in the UK is compared with practice in other countries with similar LNG storage requirements. Emphasis is placed on the excellent record of safety and reliability exhibited by tanks with a primary metal container designed and constructed to approved standards. The work carried out to promote the development of new materials, fire protection, and monitoring systems for use in LNG storage is also summarized, and specific examples described from British Gas experience. Finally, the trends in storage tank design world-wide and options for future design concepts are discussed, bearing in mind planned legislation and design codes governing hazardous installations.
14 CFR 21.95 - Approval of minor changes in type design.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Approval of minor changes in type design... TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Changes to Type Certificates § 21.95 Approval of minor changes in type design. Minor changes in a type design may be approved under a method...
14 CFR 21.95 - Approval of minor changes in type design.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Approval of minor changes in type design... TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Changes to Type Certificates § 21.95 Approval of minor changes in type design. Minor changes in a type design may be approved under a method...
14 CFR 21.95 - Approval of minor changes in type design.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Approval of minor changes in type design... TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Changes to Type Certificates § 21.95 Approval of minor changes in type design. Minor changes in a type design may be approved under a method...
14 CFR 21.95 - Approval of minor changes in type design.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Approval of minor changes in type design... TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Changes to Type Certificates § 21.95 Approval of minor changes in type design. Minor changes in a type design may be approved under a method...
14 CFR 21.95 - Approval of minor changes in type design.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Approval of minor changes in type design... TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Changes to Type Certificates § 21.95 Approval of minor changes in type design. Minor changes in a type design may be approved under a method...
46 CFR 160.176-6 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Procedure for approval of design or material revision... Lifejackets § 160.176-6 Procedure for approval of design or material revision. (a) Each change in design, material, or construction must be approved by the Commandant before being used in lifejacket production. (b...
10 CFR 52.143 - Staff approval of design.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Staff approval of design. 52.143 Section 52.143 Energy... Standard Design Approvals § 52.143 Staff approval of design. Upon completion of its review of a submittal....141 of this subpart, the NRC staff shall publish a determination in the Federal Register as to whether...
10 CFR 52.143 - Staff approval of design.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Staff approval of design. 52.143 Section 52.143 Energy... Standard Design Approvals § 52.143 Staff approval of design. Upon completion of its review of a submittal....141 of this subpart, the NRC staff shall publish a determination in the Federal Register as to whether...
10 CFR 52.143 - Staff approval of design.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Staff approval of design. 52.143 Section 52.143 Energy... Standard Design Approvals § 52.143 Staff approval of design. Upon completion of its review of a submittal....141 of this subpart, the NRC staff shall publish a determination in the Federal Register as to whether...
10 CFR 52.143 - Staff approval of design.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Staff approval of design. 52.143 Section 52.143 Energy... Standard Design Approvals § 52.143 Staff approval of design. Upon completion of its review of a submittal....141 of this subpart, the NRC staff shall publish a determination in the Federal Register as to whether...
10 CFR 52.143 - Staff approval of design.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Staff approval of design. 52.143 Section 52.143 Energy... Standard Design Approvals § 52.143 Staff approval of design. Upon completion of its review of a submittal....141 of this subpart, the NRC staff shall publish a determination in the Federal Register as to whether...
Characteristic Boundary Conditions for ARO-1
1983-05-01
I As shown in Fig. 3, the point designated II is the interior point that was used to define the barred coordinate system , evaluated at time t=. All...L. Jacocks Calspan Field Services, Inc. May 1983 Final Report for Period October 1981 - September 1982 r Approved for public release; destribut ...on unlimited I ARNOLD ENGINEERING DEVELOPMENT CENTER ARNOLD AIR FORCE STATION, TENNESSEE AIR FORCE SYSTEMS COMMAND UNITED STATES AIR FORCE N O T I
GnoSys: Raising the Level of Discourse in Programming
2016-03-01
slotting these results into their proper place in the unified whole is still ongoing as of the date of this final report. Approved for Public Release...static restrictions we place on type systems; they can be any computable property. This is in keep- ing with the general design philosophy of GnoSys...different languages. Because contracts are frequently placed on module boundaries, they ease the burden placed on our analysis and verification tools
2006-11-01
Avenue Urbana , IL 61801-4797 Final report Approved for public release; distribution is unlimited. Prepared for U.S. Army Corps of Engineers...allow validation of each structure’s effectiveness. Approach A research team consisting of members from the University of Illinois, Urbana ...and preferential drainage channel. Furthermore, dry weather conditions on unimproved ERDC/CERL TR-06-31 4 roads generate large volumes of airborne
Targeting Siah2 as Novel Therapy for Metastatic Prostate Cancer
2017-12-01
CONTRACTING ORGANIZATION: Cedars-Sinai Medical Center Los Angeles, CA 90048 REPORT DATE: December 2017 TYPE OF REPORT : Final PREPARED FOR: U.S. Army...unlimited. The views, opinions and/or findings contained in this report are those of the author(s) and should not be construed as an official...Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188
Freeze-Dried Human Red Blood Cells.
1992-07-15
conducted with the approval of the appropriate Institutional Review Board. The design and dosage of these studies parallels what would be used in any...components by standard blood bank procedures. The red blood cells were mixed with standard lyophilization buffers at a standard blood to buffer ratio. Samples...3% -1% - Yeas I Year 2 i Final poduct sterility (at Inluslon stage). Not done O "emonstrated Year I Year 2 Shell Life: Refrlgerated storage. vt10
46 CFR 162.018-8 - Procedure for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the...) Reports of conducted tests on designs of safety relief valves different from those previously approved... approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings...
46 CFR 162.018-8 - Procedure for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the...) Reports of conducted tests on designs of safety relief valves different from those previously approved... approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings...
46 CFR 162.018-8 - Procedure for approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the...) Reports of conducted tests on designs of safety relief valves different from those previously approved... approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings...
46 CFR 162.018-8 - Procedure for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the...) Reports of conducted tests on designs of safety relief valves different from those previously approved... approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings...
46 CFR 162.018-8 - Procedure for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the...) Reports of conducted tests on designs of safety relief valves different from those previously approved... approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings...
Design and Synthesis of Tight Pitch FLCs for Analog Voltage-Limited Electro-Optic Modulators
1994-05-27
or decision, unless so designated b other documentation. 12a. DISTRIBUTION/AVAILABILITY STATEMENT b, DISTRIBUTION CODE Approved for public release...other end, a wide variety of cores can be synthesized. This is the preferred method for making about 40% of the cores shown in Figure 1. [PGO(Ar) -- B ...methanol, and finally dehydration to the nitrile 51 using phosphorus pentoxide. 0 OHO %%’QL X1) Bu2 BOTf A). 482 ) CH3CHO 49 it N •N O =Xc DEAD, TPP C8H17 O H
Integrative Lifecourse and Genetic Analysis of Military Working Dogs
2013-10-01
Working Dogs 5b. GRANT NUMBER W81XWH-11-2-0226 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Dr. Kun Huang 5d. PROJECT NUMBER 5e. TASK...we submitted final revisions on our IACUC protocol for the collection of biological samples and Lackland veterinary approval was granted ; and...final Lackland AFB oversight approval was granted and those documents were submitted to DoD CDMRP grant administration. Currently, there is one final
49 CFR 178.74 - Approval of MEGCs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Specifications for Cylinders § 178.74 Approval of MEGCs. (a) Application for design type approval. (1) Each new MEGC design type must have a design approval certificate. An owner or manufacturer must apply to an... materials of the same type and thickness, by the same fabrication techniques and with identical supports...
40 CFR 272.2251 - Utah State-Administered program: Final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for Final authorization which was approved by EPA effective on October 24, 1984. Subsequent program revision applications were approved effective on March 7, 1989; July 22, 1991; July 14, 1992; April 13, 1993; December 13, 1994; July 21, 1997; and March 15, 1999. (b) State statutes and regulations. (1) The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Department of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is taking final action to approve North Dakota Department of Agriculture's... Department of Agriculture (iv) The initials RMP mean Risk Management Plan (v) The initials CFR mean Code of...
75 FR 68429 - Cranes and Derricks in Construction; Approval of Information Collection Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
.... OSHA-2007-0066] RIN 1218-AC01 Cranes and Derricks in Construction; Approval of Information Collection... requirements. SUMMARY: On August 9, 2010, OSHA published a final rule revising the Cranes and Derricks Standard... necessary to protect employees during the use of cranes and derricks in construction. That final standard...
EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.
EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
... Accounting Oversight Board; Order Approving Proposed Board Funding Final Rules for Allocation of the Board's Accounting Support Fee Among Issuers, Brokers, and Dealers, and Other Amendments to the Board's Funding Rules August 18, 2011. I. Introduction On June 21, 2011, the Public Company Accounting Oversight Board (the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...
This page contains the Final Approval Document, Response to Public Comments and Draft Approval Issued for Public Comment for the Approval to Dispose of Less than 50 Parts Per Million Polychlorinated Biphenyl Remediation Waste Issued to USWAG
Design, Construction and Testing of an In-Pile Loop for PWR (Pressurized Water Reactor) Simulation.
1987-06-01
computer modeling remains at best semiempirical (C-i), this large variation in scaling factor makes extrapolation of data impossible. The DIDO Water...in a full scale PWR are not practical. The reactor plant is not controlled to tolerances necessary for research, and utilities are reluctant to vary...MIT Reactor Safeguards Committee, in revision 1 to the PCCL Safety Evaluation Report (SER), for final approval to begin in-pile testing and
2015-11-18
University of Idaho was tasked with designing methods to monitor species of concern on DoD lands as part of four DoD grants. With the funds granted we were...Approved for Public Release; Distribution Unlimited Final Report: Molecular Genetic Equipment for Improved Inventory and Monitoring of Species of...Monitoring of Species of Conservation Concern on Department of Defense Lands Report Title The Laboratory for Ecological, Evolutionary and Conservation
21 CFR 314.105 - Approval of an application and an abbreviated application.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA...) FDA will approve an application and issue the applicant an approval letter on the basis of draft... labeling changes exactly as directed, and upon the applicant submitting to FDA a copy of the final printed...
21 CFR 314.105 - Approval of an application and an abbreviated application.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA...) FDA will approve an application and issue the applicant an approval letter on the basis of draft... labeling changes exactly as directed, and upon the applicant submitting to FDA a copy of the final printed...
21 CFR 314.105 - Approval of an application and an abbreviated application.
Code of Federal Regulations, 2014 CFR
2014-04-01
... HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA...) FDA will approve an application and issue the applicant an approval letter on the basis of draft... labeling changes exactly as directed, and upon the applicant submitting to FDA a copy of the final printed...
21 CFR 314.105 - Approval of an application and an abbreviated application.
Code of Federal Regulations, 2013 CFR
2013-04-01
... HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA...) FDA will approve an application and issue the applicant an approval letter on the basis of draft... labeling changes exactly as directed, and upon the applicant submitting to FDA a copy of the final printed...
21 CFR 314.105 - Approval of an application and an abbreviated application.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA...) FDA will approve an application and issue the applicant an approval letter on the basis of draft... labeling changes exactly as directed, and upon the applicant submitting to FDA a copy of the final printed...
46 CFR 160.050-7 - Procedure for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoy, Life Ring, Unicellular Plastic § 160.050-7 Procedure for approval. (a) General. Designs of ring life buoys are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a ring life buoy design shall follow the...
46 CFR 160.001-3 - Procedure for approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, General § 160.001-3 Procedure for approval. (a) General. Designs of life preservers are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a life preserver design shall follow the procedures of this section and subpart 159...
46 CFR 160.001-3 - Procedure for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, General § 160.001-3 Procedure for approval. (a) General. Designs of life preservers are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a life preserver design shall follow the procedures of this section and subpart 159...
46 CFR 160.001-3 - Procedure for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, General § 160.001-3 Procedure for approval. (a) General. Designs of life preservers are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a life preserver design shall follow the procedures of this section and subpart 159...
46 CFR 160.050-7 - Procedure for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoy, Life Ring, Unicellular Plastic § 160.050-7 Procedure for approval. (a) General. Designs of ring life buoys are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a ring life buoy design shall follow the...
46 CFR 160.050-7 - Procedure for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoy, Life Ring, Unicellular Plastic § 160.050-7 Procedure for approval. (a) General. Designs of ring life buoys are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a ring life buoy design shall follow the...
46 CFR 160.050-7 - Procedure for approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoy, Life Ring, Unicellular Plastic § 160.050-7 Procedure for approval. (a) General. Designs of ring life buoys are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a ring life buoy design shall follow the...
46 CFR 160.050-7 - Procedure for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoy, Life Ring, Unicellular Plastic § 160.050-7 Procedure for approval. (a) General. Designs of ring life buoys are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a ring life buoy design shall follow the...
46 CFR 160.001-3 - Procedure for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, General § 160.001-3 Procedure for approval. (a) General. Designs of life preservers are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a life preserver design shall follow the procedures of this section and subpart 159...
46 CFR 160.001-3 - Procedure for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, General § 160.001-3 Procedure for approval. (a) General. Designs of life preservers are approved only by the Commandant, U.S. Coast Guard. Manufacturers seeking approval of a life preserver design shall follow the procedures of this section and subpart 159...
46 CFR 162.017-6 - Procedure for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and size of wire of flame screens. (c) Pre-approval tests. Before approval is granted, the... desiring approval of a new design or type of pressure-vacuum relief valve shall submit drawings in quadruplicate showing the design of the valve, the sizes for which approval is requested, method of operation...
46 CFR 162.017-6 - Procedure for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and size of wire of flame screens. (c) Pre-approval tests. Before approval is granted, the... desiring approval of a new design or type of pressure-vacuum relief valve shall submit drawings in quadruplicate showing the design of the valve, the sizes for which approval is requested, method of operation...
46 CFR 162.017-6 - Procedure for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and size of wire of flame screens. (c) Pre-approval tests. Before approval is granted, the... desiring approval of a new design or type of pressure-vacuum relief valve shall submit drawings in quadruplicate showing the design of the valve, the sizes for which approval is requested, method of operation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
...-0394, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
...-0292, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...
25 CFR 224.74 - When must the Secretary approve or disapprove a final proposed TERA?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false When must the Secretary approve or disapprove a final proposed TERA? 224.74 Section 224.74 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS TRIBAL ENERGY RESOURCE AGREEMENTS UNDER THE INDIAN TRIBAL ENERGY DEVELOPMENT AND SELF...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2009-0790; FRL-9114-3] Approval and...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action..., Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 Wynkoop Street, Denver, Colorado 80202...
77 FR 47544 - Approval of Classification Societies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
...-AB35 Approval of Classification Societies AGENCY: Coast Guard, DHS. ACTION: Final rule. SUMMARY: Federal law requires that classification societies conducting certain work in the United States be... that classification societies must meet in order to obtain approval by the Coast Guard. Through this...
14 CFR 21.621 - Issue of letters of TSO design approval: Import articles.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Issue of letters of TSO design approval: Import articles. 21.621 Section 21.621 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Approvals § 21.621 Issue of letters of TSO design approval: Import articles. (a) The FAA may issue a letter...
14 CFR 21.621 - Issue of letters of TSO design approval: Import articles.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Issue of letters of TSO design approval: Import articles. 21.621 Section 21.621 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Approvals § 21.621 Issue of letters of TSO design approval: Import articles. (a) The FAA may issue a letter...
14 CFR 21.621 - Issue of letters of TSO design approval: Import articles.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Issue of letters of TSO design approval: Import articles. 21.621 Section 21.621 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Approvals § 21.621 Issue of letters of TSO design approval: Import articles. (a) The FAA may issue a letter...
46 CFR 160.176-6 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design or material revision. 160.176-6 Section 160.176-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-6 Procedure for approval of design...
46 CFR 160.176-6 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Procedure for approval of design or material revision. 160.176-6 Section 160.176-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-6 Procedure for approval of design...
46 CFR 160.176-6 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design or material revision. 160.176-6 Section 160.176-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-6 Procedure for approval of design...
19 CFR 115.9 - Certifying Authorities responsibilities-containers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... may be approved for transport under seal by design type at the manufacturing stage or, otherwise, at a stage subsequent to manufacture. (b) Design type approval. The Certifying Authority to whom a container is submitted for design type approval shall examine the drawings and detailed design specifications...
19 CFR 115.9 - Certifying Authorities responsibilities-containers.
Code of Federal Regulations, 2012 CFR
2012-04-01
... may be approved for transport under seal by design type at the manufacturing stage or, otherwise, at a stage subsequent to manufacture. (b) Design type approval. The Certifying Authority to whom a container is submitted for design type approval shall examine the drawings and detailed design specifications...
19 CFR 115.9 - Certifying Authorities responsibilities-containers.
Code of Federal Regulations, 2014 CFR
2014-04-01
... may be approved for transport under seal by design type at the manufacturing stage or, otherwise, at a stage subsequent to manufacture. (b) Design type approval. The Certifying Authority to whom a container is submitted for design type approval shall examine the drawings and detailed design specifications...
19 CFR 115.9 - Certifying Authorities responsibilities-containers.
Code of Federal Regulations, 2011 CFR
2011-04-01
... may be approved for transport under seal by design type at the manufacturing stage or, otherwise, at a stage subsequent to manufacture. (b) Design type approval. The Certifying Authority to whom a container is submitted for design type approval shall examine the drawings and detailed design specifications...
19 CFR 115.9 - Certifying Authorities responsibilities-containers.
Code of Federal Regulations, 2013 CFR
2013-04-01
... may be approved for transport under seal by design type at the manufacturing stage or, otherwise, at a stage subsequent to manufacture. (b) Design type approval. The Certifying Authority to whom a container is submitted for design type approval shall examine the drawings and detailed design specifications...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
tetrahydrocannabinol (delta-9-THC)] in Schedule II. Final rule.
2017-11-22
This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.
49 CFR 451.25 - Required information.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Safety Approval Plate § 451... same for all containers of a design-type or type-series covered by one notice of approval. (c) The safety approval number must be the same for all containers of a design-type or type-series covered by one...
49 CFR 451.25 - Required information.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Safety Approval Plate § 451... same for all containers of a design-type or type-series covered by one notice of approval. (c) The safety approval number must be the same for all containers of a design-type or type-series covered by one...
49 CFR 451.25 - Required information.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Safety Approval Plate § 451... same for all containers of a design-type or type-series covered by one notice of approval. (c) The safety approval number must be the same for all containers of a design-type or type-series covered by one...
49 CFR 451.25 - Required information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Safety Approval Plate § 451... same for all containers of a design-type or type-series covered by one notice of approval. (c) The safety approval number must be the same for all containers of a design-type or type-series covered by one...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
...This action is another in a series of steps EPA is taking to implement the Prevention of Significant Deterioration (PSD) program for greenhouse gas (GHG)-emitting sources. EPA is finalizing its proposed rulemaking to narrow its previous approval of State Implementation Plan (SIP) PSD programs in 24 states that apply to GHG-emitting sources. Specifically, EPA is withdrawing its previous approval of those programs to the extent they apply PSD to GHG-emitting sources below the thresholds in the final Tailoring Rule, which EPA promulgated by Federal Register notice dated June 3, 2010. Having narrowed its prior approval, EPA asks that each affected state withdraw from EPA consideration the part of its SIP that is no longer approved. The states for whose SIPs EPA is narrowing approval are: Alabama, California, Colorado, Georgia, Indiana, Iowa, Louisiana, Maine, Maryland, Mississippi, Missouri, New Hampshire, New Mexico, North Carolina, Ohio, Oklahoma, Rhode Island, South Carolina, South Dakota, Tennessee, Utah, Vermont, Virginia, and Wisconsin.
48 CFR 227.7107-3 - Approval of restricted designs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... designs. 227.7107-3 Section 227.7107-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Rights in Technical Data 227.7107-3 Approval of restricted designs. The clause at 252.227-7024, Notice and Approval of Restricted Designs, may be included in architect-engineer contracts to permit the...
48 CFR 252.227-7024 - Notice and approval of restricted designs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... restricted designs. 252.227-7024 Section 252.227-7024 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.227-7024 Notice and approval of restricted designs. As prescribed at 227.7107-3, use the following clause: Notice and Approval of Restricted Designs (APR 1984) In...
24 CFR 3282.361 - Design Approval Primary Inspection Agency (DAPIA).
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Design Approval Primary Inspection... REGULATIONS Primary Inspection Agencies § 3282.361 Design Approval Primary Inspection Agency (DAPIA). (a... manufactured home designs submitted to it by the manufacturer and for assuring that they conform to the...
Drotrecogin alfa (activated)...a sad final fizzle to a roller-coaster party.
Angus, Derek C
2012-02-06
Following the failure of PROWESS-SHOCK to demonstrate efficacy, Eli Lilly and Company withdrew drotrecogin alfa (activated) from the worldwide market. Drotrecogin was initially approved after the original trial, PROWESS, was stopped early for overwhelming efficacy. These events prompt consideration of both the initial approval decision and the later decision to withdraw. It is regrettable that the initial decision was made largely on a single trial that was stopped early. However, the decision to approve was within the bounds of normal regulatory practice and was made by many approval bodies around the world. Furthermore, the overall withdrawal rate of approved drugs remains very low. The decision to withdraw was a voluntary decision by Eli Lilly and Company and likely reflected key business considerations. Drotrecogin does have important biologic effects, and it is probable that we do not know how best to select patients who would benefit. Overall, there may still be a small advantage to drotrecogin alfa, even used non-selectively, but the costs of determining such an effect with adequate certainty are likely prohibitive, and the point is now moot. In the future, we should consider ways to make clinical trials easier and quicker so that more information can be available in a timely manner when considering regulatory approval. At the same time, more sophisticated selection of patients seems key if we are to most wisely test agents designed to manipulate the septic host response.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
...): Interstate transport.\\3\\ \\3\\ Today's final rule does not address element 110(a)(2)(D)(i) (Interstate Transport) for the 1997 8-hour ozone NAAQS. Interstate transport requirements were formerly addressed by... 896 (D.C. Cir. 2008). Prior to this remand, EPA took final action to approve Florida's SIP revision...
10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.
Code of Federal Regulations, 2010 CFR
2010-01-01
....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...
10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.
Code of Federal Regulations, 2012 CFR
2012-01-01
....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... action is EPA approving? B. Why is EPA approving this delisting? C. How will Beaumont Refinery manage the wastes, if it is delisted? D. When would the delisting exclusion be finalized? E. How would this action... petition? D. What were the results of Beaumont Refinery's analysis? E. How did EPA evaluate the risk of...
Raster profile development for the spatial data transfer standard
Szemraj, John A.
1993-01-01
The Spatial Data Transfer Standard (SDTS), recently approved as Federal Information Processing Standard (FIPS) Publication 173, is designed to transfer various types of spatial data. Implementing all of the standard's options at one time is impractical. Profiles, or limited subsets of the SDTS, are the mechanisms by which the standards will be implemented. The development of a raster profile is being coordinated by the U.S. Geological Survey's (USGS) SDTS Task Force. This raster profile is intended to accommodate digital georeferenced image data and regularly spaces, georeferenced gridded data. The USGS's digital elevation models (DEMs) and digital orthophoto quadrangles (DOQs), National Oceanic and Atmospheric Administration's (NOAA) advanced very huh resolution radiometer (AVHRR) and Landsat data, and National Aeronautics and Space Administration's (NASA) Earth observing system (EOS) data are among the candidate data sets for this profile. Other raster profiles, designed to support nongeoreferenced and other types of "raw" sensor data will be consider in the future. As with the Topological Vector Profile (TVP) for the SDTS, development of the raster profile includes designing a prototype profile, testing the prototype profile using sample data sets, and finally, requesting and receiving FIPS approval.
Vermont Independent School Youth Needs Assessment Project. Final Report.
ERIC Educational Resources Information Center
Vermont State Department of Education, 2004
2004-01-01
This report contains information based on 47 interviews with administrators and educators from technical centers, approved and recognized independent schools, recognized schools, state operated facilities, state approved programs, and state approved tutorials in Vermont. The information in this report is based on self-reporting by individual…
1985-07-30
This final rule provides the additional requirements to the conditions and procedures for initial approval and reapproval of Medicaid Management Information Systems (MMIS) that were added by section 1903(r) of the Social Security Act (as amended by section 901 of the Mental Health Systems Act of 1980, Pub. L. 96-398). These provisions are intended to improve States' MMIS, ensure efficient system operations, and make the procedures for detection of fraud, waste, and abuse more effective. In addition, this final rule specifies the procedures we follow in reducing the level of Federal financial participation in State administrative expenditures if a State fails to meet the conditions for initial operation, initial approval, or reapproval of an MMIS.
Supplements and other changes to an approved application. Final rule.
2004-04-08
The Food and Drug Administration (FDA) is amending its regulations on supplements and other changes to an approved application to implement the manufacturing changes provision of the Food and Drug Administration Modernization Act of 1997 (the Modernization Act). The final rule requires manufacturers to assess the effects of manufacturing changes on the identity, strength, quality, purity, and potency of a drug or biological product as those factors relate to the safety or effectiveness of the product. The final rule sets forth requirements for changes requiring supplement submission and approval before the distribution of the product made using the change, changes requiring supplement submission at least 30 days prior to the distribution of the product, changes requiring supplement submission at the time of distribution, and changes to be described in an annual report.
In Vivo Testing of Chemopreventive Agents Using the Dog Model of Spontaneous Prostate Carcinogenesis
2005-03-01
2005 TYPE OF REPORT: Final PR1 PARED F-OR: U.S. Ariny Medical Rsearch nd Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT...should not be consirued as an oliciail Department of the Army position, policy or decision unless so designated by other documentation. 1 Form Approved...trace mineral selenium and DNA damage, apoptosis, and androgens in the prostate. Our work has generated the first evidence of a non -linear, U-shaped
A Design-Aid and Cost Estimate Model for Suppressive Shielding Structures
1975-12-01
Final Report APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIM4ITED Prepared for SAFETY ENGINEERING GRADUATE PROGRAM AND TEXAS A&1-., UNIVERSITY USAVC...Coinryuter Science Department, Texas A&1.! ’ University . 19. KEY dVOIRS (Continue an rcverse siJ~e it necessary mind lde.ifily by block lumber...1473 EDITION OF T NOV 65 IS 005OLETE SE.CURITY CLASSIFICATION OF TkIS PACE (Whtin Pa&121. ~t. SECUnITY CLASSIFICATION OF THIS PAGE(W4uio DOl’ Enteted
The Design and Emulation of a System Kernel for X-Tree,
1979-03-30
DECLASSIFICATIONIDOWNGRADING I SCHEDULE 16. DISTRIBUTION STATEMENT (ol this Report) Approved for public release; distributi.- ti4imited -; T ? A~ 17. DISTRIBUTION STATEMENT...level of the tPee. ManvIL different schemes for these additional interconnections have been Proposed. No final selection h-as set been made. Pic- tured...comFletion, 5_U (b) Irenoves the Process name from the hash table, (c) F’uts the PCB back on the FREEPCB aueue for later reuse# ( d) Goes L:ack to sleep . Ai
46 CFR 160.077-7 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2010 CFR
2010-10-01
... being used in any production of PFDs. (b) Determinations of equivalence of design, construction, and... 46 Shipping 6 2010-10-01 2010-10-01 false Procedure for approval of design or material revision... Personal Flotation Devices § 160.077-7 Procedure for approval of design or material revision. (a) Each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
...EPA is proposing to approve a request from Illinois to redesignate the Illinois portion of the Chicago-Gary-Lake County, Illinois-Indiana (IL-IN) ozone nonattainment area (the Greater Chicago area) to attainment of the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS or standard) because the request meets the statutory requirements for redesignation under the Clean Air Act (CAA). The Illinois portion of the Greater Chicago area includes Cook, DuPage, Kane, Lake, McHenry, and Will Counties and portions of Grundy (Aux Sable and Goose Lake Townships) and Kendall (Oswego Township) Counties. The Illinois Environmental Protection Agency (IEPA) submitted this request on July 23, 2009, and supplemented its request in a submittal on September 16, 2011. EPA is proposing to approve, as a revision of the Illinois State Implementation Plan (SIP), the State's plan for maintaining the 1997 8-hour ozone standard through 2025 in the Illinois portion of the Greater Chicago area. EPA is proposing to approve 2002 Volatile Organic Compound (VOC) and Nitrogen Oxides (NOX) emission inventories for the Illinois portion of the Greater Chicago area as a revision of the Illinois SIP because the emission inventories meet the requirements of section 182(a) of the CAA. Finally, EPA proposes to approve the State's 2008 and 2025 VOC and NOX Motor Vehicle Emission Budgets (MVEBs) for the Illinois portion of the Greater Chicago area.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
49 CFR 107.705 - Registrations, reports, and applications for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Hazardous Materials Safety (Attention: Approvals, PHH-32), Pipeline and Hazardous Materials Safety... registration, report, or application is made and, if different, the person making the filing; (5) If the person... approval until a final decision on the application for renewal has been made. Operation under an expired...
30 CFR 948.15 - Approval of West Virginia regulatory program amendments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... amendments. 948.15 Section 948.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... approving all or portions of those amendments in the Federal Register, and the State statutory or regulatory... to those final rules identify and discuss any assumptions underlying approval, any conditions placed...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
...-0413; Amdt. No. 29-55] RIN 2120-AJ51 Fatigue Tolerance Evaluation of Metallic Structures; OMB Approval of Information Collection AGENCY: Federal Aviation Administration, DOT. ACTION: Final rule; OMB approval of information collection. SUMMARY: This document notifies the public of the Office of Management...
Hwang, Thomas J; Franklin, Jessica M; Chen, Christopher T; Lauffenburger, Julie C; Gyawali, Bishal; Kesselheim, Aaron S; Darrow, Jonathan J
2018-04-24
Purpose The breakthrough therapy program was established in 2012 to expedite the development and review of new medicines. We evaluated the times to approval, efficacy, and safety of breakthrough-designated versus non-breakthrough-designated cancer drugs approved by the US Food and Drug Administration (FDA). Methods We studied all new cancer drugs approved by the FDA between January 2012 and December 2017. Regulatory and therapeutic characteristics (time to FDA approval, pivotal trial efficacy end point, novelty of mechanism of action) were compared between breakthrough-designated and non-breakthrough-designated cancer drugs. Random-effects meta-regression was used to assess the association between breakthrough therapy designation and hazard ratios for progression-free survival (PFS), response rates (RRs) for solid tumors, serious adverse events, and deaths not attributed to disease progression. Results Between 2012 and 2017, the FDA approved 58 new cancer drugs, 25 (43%) of which received breakthrough therapy designation. The median time to first FDA approval was 5.2 years for breakthrough-designated drugs versus 7.1 years for non-breakthrough-designated drugs (difference, 1.9 years; P = .01). There were no statistically significant differences between breakthrough-designated and non-breakthrough-designated drugs in median PFS gains (8.6 v 4.0 months; P = .11), hazard ratios for PFS (0.43 v 0.51; P = .28), or RRs for solid tumors (37% v 39%; P = .74). Breakthrough therapy-designated drugs were not more likely to act via a novel mechanism of action (36% v 39%; P = 1.00). Rates of deaths (6% v 4%; P = .99) and serious adverse events (38% v 36%; P = 0.93) were also similar in breakthrough-designated and non-breakthrough-designated drugs. Conclusion Breakthrough-designated cancer drugs were associated with faster times to approval, but there was no evidence that these drugs provide improvements in safety or novelty; nor was there a statistically significant efficacy advantage when compared with non-breakthrough-designated drugs.
14 CFR 21.621 - Transferability and duration.
Code of Federal Regulations, 2010 CFR
2010-01-01
... FAA design and production approval issued to the manufacturer of an article that has been found to... authorization, or letter of TSO design approval may continue to manufacture articles that meet the original TSO... Transferability and duration. A TSO authorization or letter of TSO design approval issued under this part is not...
19 CFR 115.63 - Application for approval.
Code of Federal Regulations, 2012 CFR
2012-04-01
... of the design type and the serial number of the vehicle in the type series manufacturer's number; and... Procedures for Approval of Road Vehicles by Design Type § 115.63 Application for approval. Each application by a manufacturer for certification of a road vehicle by design type must include: (a) Three copies...
19 CFR 115.63 - Application for approval.
Code of Federal Regulations, 2013 CFR
2013-04-01
... of the design type and the serial number of the vehicle in the type series manufacturer's number; and... Procedures for Approval of Road Vehicles by Design Type § 115.63 Application for approval. Each application by a manufacturer for certification of a road vehicle by design type must include: (a) Three copies...
19 CFR 115.63 - Application for approval.
Code of Federal Regulations, 2014 CFR
2014-04-01
... of the design type and the serial number of the vehicle in the type series manufacturer's number; and... Procedures for Approval of Road Vehicles by Design Type § 115.63 Application for approval. Each application by a manufacturer for certification of a road vehicle by design type must include: (a) Three copies...
19 CFR 115.63 - Application for approval.
Code of Federal Regulations, 2010 CFR
2010-04-01
... of the design type and the serial number of the vehicle in the type series manufacturer's number; and... Procedures for Approval of Road Vehicles by Design Type § 115.63 Application for approval. Each application by a manufacturer for certification of a road vehicle by design type must include: (a) Three copies...
19 CFR 115.63 - Application for approval.
Code of Federal Regulations, 2011 CFR
2011-04-01
... of the design type and the serial number of the vehicle in the type series manufacturer's number; and... Procedures for Approval of Road Vehicles by Design Type § 115.63 Application for approval. Each application by a manufacturer for certification of a road vehicle by design type must include: (a) Three copies...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
...] Post-Approval Studies 2012 Workshop: Design, Methodology, and Role in Evidence Appraisal Throughout the... Administration (FDA) is announcing the following public workshop entitled ``Post-Approval Studies 2012 Workshop: Design, Methodology, and Role in Evidence Appraisal Throughout the Total Product Life Cycle.'' The topics...
14 CFR 183.31 - Designated manufacturing inspection representatives.
Code of Federal Regulations, 2012 CFR
2012-01-01
... airworthiness approvals for engines, propellers, and product parts that conform to the approved design... airworthiness approval tags in accordance with subpart L of part 21 of this chapter; (3) Experimental... changes to the type design requiring a flight test; and (4) Special flight permits to export aircraft. (b...
14 CFR 183.31 - Designated manufacturing inspection representatives.
Code of Federal Regulations, 2014 CFR
2014-01-01
... airworthiness approvals for engines, propellers, and product parts that conform to the approved design... airworthiness approval tags in accordance with subpart L of part 21 of this chapter; (3) Experimental... changes to the type design requiring a flight test; and (4) Special flight permits to export aircraft. (b...
14 CFR 183.31 - Designated manufacturing inspection representatives.
Code of Federal Regulations, 2011 CFR
2011-01-01
... airworthiness approvals for engines, propellers, and product parts that conform to the approved design... airworthiness approval tags in accordance with subpart L of part 21 of this chapter; (3) Experimental... changes to the type design requiring a flight test; and (4) Special flight permits to export aircraft. (b...
14 CFR 183.31 - Designated manufacturing inspection representatives.
Code of Federal Regulations, 2013 CFR
2013-01-01
... airworthiness approvals for engines, propellers, and product parts that conform to the approved design... airworthiness approval tags in accordance with subpart L of part 21 of this chapter; (3) Experimental... changes to the type design requiring a flight test; and (4) Special flight permits to export aircraft. (b...
14 CFR 183.31 - Designated manufacturing inspection representatives.
Code of Federal Regulations, 2010 CFR
2010-01-01
... airworthiness approvals for engines, propellers, and product parts that conform to the approved design... airworthiness approval tags in accordance with subpart L of part 21 of this chapter; (3) Experimental... changes to the type design requiring a flight test; and (4) Special flight permits to export aircraft. (b...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2011 CFR
2011-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2013 CFR
2013-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2014 CFR
2014-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2012 CFR
2012-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
49 CFR 178.70 - Approval of UN pressure receptacles.
Code of Federal Regulations, 2012 CFR
2012-10-01
... designee. (b) IIA pre-audit. The manufacturer must submit an application for initial design type approval... of the manufacturer and the IIA certifying the design type, the test results, chemical analyses, lot... initial design type approval. If the pre-audit is found satisfactory by the IIA, the manufacturer will...
49 CFR 178.70 - Approval of UN pressure receptacles.
Code of Federal Regulations, 2011 CFR
2011-10-01
... designee. (b) IIA pre-audit. The manufacturer must submit an application for initial design type approval... of the manufacturer and the IIA certifying the design type, the test results, chemical analyses, lot... initial design type approval. If the pre-audit is found satisfactory by the IIA, the manufacturer will...
49 CFR 178.70 - Approval of UN pressure receptacles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... designee. (b) IIA pre-audit. The manufacturer must submit an application for initial design type approval... of the manufacturer and the IIA certifying the design type, the test results, chemical analyses, lot... initial design type approval. If the pre-audit is found satisfactory by the IIA, the manufacturer will...
49 CFR 178.70 - Approval of UN pressure receptacles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... designee. (b) IIA pre-audit. The manufacturer must submit an application for initial design type approval... of the manufacturer and the IIA certifying the design type, the test results, chemical analyses, lot... initial design type approval. If the pre-audit is found satisfactory by the IIA, the manufacturer will...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2010 CFR
2010-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
25 CFR 224.74 - When must the Secretary approve or disapprove a final proposed TERA?
Code of Federal Regulations, 2011 CFR
2011-04-01
... proposed TERA? 224.74 Section 224.74 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS TRIBAL ENERGY RESOURCE AGREEMENTS UNDER THE INDIAN TRIBAL ENERGY DEVELOPMENT AND SELF DETERMINATION ACT Approval of Tribal Energy Resource Agreements § 224.74 When must the Secretary approve or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 281 [EPA-R10-UST-2011-0097; FRL-9296-1] Oregon: Tentative Approval of State Underground Storage Tank Program: Public Hearing Cancellation AGENCY... application for final approval of its Underground Storage Tank (UST) Program under Subtitle I of the Resource...
76 FR 40624 - Approval and Promulgation of Implementation Plans; State of Kansas
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
... in the proposal, as supplemented by this notice, as its rationale for the final rule. No public... approved emissions limits with limited public process or without requiring further approval by EPA, that... on proposals for three states in Region 5). EPA notes that these public comments on another proposal...
76 FR 40619 - Approval and Promulgation of Implementation Plans; State of Missouri
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
... in the proposal as supplemented by this rule, as its rationale for the final rule. No public comments... approved emissions limits with limited public process or without requiring further approval by EPA, that... for three states in Region 5). EPA notes that these public comments on another proposal are not...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
... Promulgation of Air Quality Implementation Plans; Delaware; Regional Haze State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving the Delaware Regional Haze... visibility in mandatory Class I areas through a regional haze program. EPA is also approving this revision...
7 CFR 3415.7 - Use of funds; changes.
Code of Federal Regulations, 2010 CFR
2010-01-01
... CSREES or ARS, as appropriate, for a final determination. (2) Changes in approved goals, or objectives, shall be requested by the grantee and approved in writing by the awarding official of CSREES or ARS, as... approved in writing by the awarding official of CSREES or ARS, as appropriate, prior to effecting such...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0073; FRL 9677-3] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container Exemption From VOC Coating Rules...), direct final rule approving a revision to the Illinois SIP that added a ``small container exemption'' for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... Promulgation of Air Quality Implementation Plans; Virginia; Revision to the Definition of Volatile Organic... approve the State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia consisting... section of this Federal Register, EPA is approving Virginia's SIP submittal as a direct final rule without...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Definition of Volatile Organic... proposes to approve the State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia... (VOC). In the Final Rules section of this Federal Register, EPA is approving Virginia's SIP submittal...
40 CFR 282.78 - Nevada State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... chapter. EPA approved the Nevada program on December 24, 1992 and it was effective March 30, 1993. (b... 1976 (RCRA), as amended, 42 U.S.C. 6991 et seq. The state's program, as administered by the Nevada... application for final approval and approved by EPA on December 24, 1992. Copies may be obtained from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
...] Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
...] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
...] Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
77 FR 56200 - Agency Information Collection Activities OMB Responses
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... on 08/31/2015; Approved with change. EPA ICR Number 2192.05; Unregulated Contaminant Monitoring in Public Water Systems (Final Rule); 40 CFR 141.35 and 141.40; was approved on 08/06/2012; OMB Number 2040-0270; expires on 08/31/2015; Approved with change. EPA ICR Number 1560.10; National Water Quality...
Industry Application Emergency Core Cooling System Cladding Acceptance Criteria Early Demonstration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Szilard, Ronaldo H.; Youngblood, Robert W.; Zhang, Hongbin
2015-09-01
The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the loss-of-coolant-accident (LOCA)/emergency core cooling system (ECCS) acceptance criteria to include the effects of higher burnup on cladding performance as well as to address other technical issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in April 2016. The impact of the final 50.46c rule on the industry may involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or re-analyses and associated technical specification revisions formore » NRC review and approval. The rule implementation process, both industry and NRC activities, is expected to take 4-6 years following the rule effective date. As motivated by the new rule, the need to use advanced cladding designs may be a result. A loss of operational margin may result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently, there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin. The proposed rule would apply to a light water reactor and to all cladding types.« less
2015-01-29
The Food and Drug Administration (FDA or the Agency) is issuing a final order to require the filing of premarket approval applications (PMA) for automated external defibrillator (AED) systems, which consist of an AED and those AED accessories necessary for the AED to detect and interpret an electrocardiogram and deliver an electrical shock (e.g., pad electrodes, batteries, adapters, and hardware keys for pediatric use).
Hawaii State Plan for Occupational Safety and Health. Final rule.
2012-09-21
This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.
46 CFR 108.550 - Survival craft launching and recovery arrangements: General.
Code of Federal Regulations, 2011 CFR
2011-10-01
... must be designed, based on the ultimate strength of the construction material, to be at least 4.5 times...-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Lifesaving Equipment § 108.550 Survival craft... approved under approval series 160.132, with a winch approved under approval series 160.115. Each launching...
46 CFR 108.550 - Survival craft launching and recovery arrangements: General.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be designed, based on the ultimate strength of the construction material, to be at least 4.5 times...-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Lifesaving Equipment § 108.550 Survival craft... approved under approval series 160.132, with a winch approved under approval series 160.115. Each launching...
46 CFR 160.076-17 - Approval of design or material changes.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Approval of design or material changes. 160.076-17 Section 160.076-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Recreational Personal Flotation Devices § 160.076-17 Approval of...
46 CFR 160.076-17 - Approval of design or material changes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval of design or material changes. 160.076-17 Section 160.076-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Recreational Personal Flotation Devices § 160.076-17 Approval of...
46 CFR 160.076-17 - Approval of design or material changes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Approval of design or material changes. 160.076-17 Section 160.076-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Recreational Personal Flotation Devices § 160.076-17 Approval of...
46 CFR 160.035-13 - Testing and inspection after approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the pre-approval tests. Also, while flooded, the exterior of the hull shall be examined for leaks or... § 160.035-13 Testing and inspection after approval. (a) General. After the design of a lifeboat has been approved, subsequent lifeboats of the same design shall be individually inspected and tested as noted in...
46 CFR 160.035-13 - Testing and inspection after approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the pre-approval tests. Also, while flooded, the exterior of the hull shall be examined for leaks or... § 160.035-13 Testing and inspection after approval. (a) General. After the design of a lifeboat has been approved, subsequent lifeboats of the same design shall be individually inspected and tested as noted in...
14 CFR 21.617 - Issue of letters of TSO design approval: import appliances.
Code of Federal Regulations, 2010 CFR
2010-01-01
...: import appliances. 21.617 Section 21.617 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Order Authorizations § 21.617 Issue of letters of TSO design approval: import appliances. (a) A letter of TSO design approval may be issued for an appliance that is manufactured in a foreign country with...
14 CFR 21.617 - Issue of letters of TSO design approval: import appliances.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Issue of letters of TSO design approval: import appliances. 21.617 Section 21.617 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Order Authorizations § 21.617 Issue of letters of TSO design approval: import appliances. (a) A letter...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
... approval, and priority review designation. DATES: Although you can comment on any guidance at any time (see... designation, (3) accelerated approval, and (4) priority review designation. The draft guidance describes... (the FD&C Act) (Enhancement of Accelerated Approval Access to New Medical Treatments) within 1 year of...
40 CFR 52.1879 - Review of new sources and modifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... approval exempts the Lucas, Wood, Clark, Greene, Miami, and Montgomery Counties from the requirements to.... Upon final approval of this exemption, the Clark, Greene, Miami, and Montgomery Counties shall not be...
40 CFR 52.1879 - Review of new sources and modifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... approval exempts the Lucas, Wood, Clark, Greene, Miami, and Montgomery Counties from the requirements to.... Upon final approval of this exemption, the Clark, Greene, Miami, and Montgomery Counties shall not be...
49 CFR 1522.111 - Reconsideration of disapproval of an application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the... additional information from the applicant prior to rendering a decision. This disposition is a final agency...
Dixon-Woods, Mary; Foy, Chris; Hayden, Charlotte; Al-Shahi Salman, Rustam; Tebbutt, Stephen; Schroter, Sara
2016-01-01
Objective Frustration continues to be directed at delays in gaining approvals for undertaking health research in the UK. We aimed to evaluate the impact of an ethics officer intervention on rates of favourable opinions (approval) and provisional opinions (requiring revision and resubmission) and on the time taken to reach a final opinion by research ethics committees (RECs), to characterise how the role operated in practice, and to investigate applicants' views. Design Mixed-method study involving (i) a 2-group, non-randomised before-and-after intervention study of RECs assigned an ethics officer and a matched comparator group; (ii) a process evaluation involving a survey of applicants and documentary analysis. Participants 6 RECs and 3 associated ethics officers; 18 comparator RECs; REC applicants. Results Rates of provisional and favourable opinions between ethics officer and comparator RECs did not show a statistically significant effect of the intervention (logistic regression, p=0.26 for favourable opinions and p=0.31 for provisional opinions). Mean time to reach a decision showed a non-significant reduction (ANOVA, p=0.22) from 33.3 to 32.0 days in the ethics officer RECs compared with the comparator RECs (32.6 to 32.9 days). The survey (30% response rate) indicated applicant satisfaction and also suggested that ethics officer support might be more useful before submission. Ethics officers were successful in identifying many issues with applications, but the intervention did not function exactly as designed: in 31% of applicants, no contact between the applicants and the ethics officer took place before REC review. Limitations This study was a non-randomised comparison cohort study. Some data were missing. Conclusions An ethics officer intervention, as designed and implemented in this study, did not increase the proportion of applications to RECs that were approved on first review and did not reduce the time to a committee decision. PMID:27580832
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
...EPA is granting direct final approval of a revision to the Texas State Implementation Plan (SIP) concerning the Texas Low Emission Diesel fuel rules. The revisions clarify existing definitions and provisions, revise the approval procedures for alternative diesel fuel formulations, add new registration requirements, and update the rule to reflect the current program status because the rule is now fully implemented. This SIP revision meets statutory requirements.
CSAPR Direct Final Rule (77 FR 10342)
EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).
46 CFR 160.132-23 - Procedure for approval of design or material change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design or material change. 160.132-23 Section 160.132-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Davits § 160.132-23 Procedure for approval of...
46 CFR 160.132-23 - Procedure for approval of design or material change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design or material change. 160.132-23 Section 160.132-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Davits § 160.132-23 Procedure for approval of...
46 CFR 160.135-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design, material, or construction change. 160.135-23 Section 160.135-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Lifeboats § 160.135-23 Procedure for approval of...
46 CFR 160.115-23 - Procedure for approval of design or material change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design or material change. 160.115-23 Section 160.115-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Winches § 160.115-23 Procedure for approval of...
46 CFR 160.115-23 - Procedure for approval of design or material change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design or material change. 160.115-23 Section 160.115-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Winches § 160.115-23 Procedure for approval of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
... Contracts and Non-Vessel-Operating Service Arrangements; Transmission of Approved Log-In ID and Passwords... advise applicants for log-in IDs and passwords. DATES: The Final Rule is effective March 3, 2011. FOR... the U.S. Mail to transmit approved log-on IDs and password to registrants in the Commission's...
Collegiate Cyber Defense Competition Effort
2018-03-01
Energy – an electrical utility company. • 2016 : ODIN Security – a small aerospace and defense contracting firm Approved for Public Release...to secure supervisory control and data acquisition (SCADA) networks. Approved for Public Release; Distribution Unlimited 7 During the 2016 NCCDC...COLLEGIATE CYBER DEFENSE COMPETITION EFFORT UNIVERSITY OF TEXAS AT SAN ANTONIO MARCH 2018 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... taking direct final action to approve revisions to the Knox County portion of the Tennessee State... of the CAA. EPA is taking action to approve these SIP revisions. A. August 19, 2009, Submittal This... 16.3.C allowing law enforcement agencies to open burn contraband. EPA is not taking action on this...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... under the Clean Air Act (CAA), EPA is taking final action to approve state implementation plan (SIP... the background for this action? II. What action is EPA taking? III. Statutory and Executive Order... proposal to approve Indiana's state board provisions. II. What action is EPA taking? For the reasons...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... 558 [Docket No. FDA-2013-N-0839] New Animal Drugs; Withdrawal of Approval of New Animal Drug...: Final rule. SUMMARY: The Food and Drug Administration (FDA) is amending the animal drug regulations to reflect the withdrawal of approval of three new animal drug applications (NADAs) at the sponsors' request...
ERIC Educational Resources Information Center
Woloshin, Phyllis Lerman
Procedures and policies by which a new course is introduced into the Oakton Community College curriculum were analyzed in order to discover appropriate procedures for attaining course approval from the internal college governance structure, to implement those procedures in obtaining final approval, and to make recommendations for improvement of…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is promulgating full approval of the Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating...
Automated Author Aiding System Conference
1985-07-01
fraie. Most selections lead to other frames , but some have " actions ", which perform a procedural function such as running a particular program. Finally...S. Army L=J Research Institute for thie Behavioral and Social Sciences..- j July 1985 APProved for public release; distribullon unlimited. ,8 6 .. U...Repotf) Approved for public release; distribution unlimited 17. GISTRIOUTION STATEMENT (.o UI. sba’,ect tr.,.d i. Block 20, t diff.,ret from Repoar) Is
2000-04-18
This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.
Therapies for inborn errors of metabolism: what has the orphan drug act delivered?
Talele, Sonali S; Xu, Kui; Pariser, Anne R; Braun, M Miles; Farag-El-Massah, Sheiren; Phillips, M Ian; Thompson, Barry H; Coté, Timothy R
2010-07-01
The 1983 US Orphan Drug Act established a process through which promising therapies are designated as orphan products and, later, with satisfactory safety and efficacy data, receive marketing approval and fiscal incentives. We examined accomplishments in drug development for inborn errors of metabolism (IEMs). Food and Drug Administration data were used to identify orphan product designations and approvals for IEMs, and the trends for the past 26 years were summarized. Individual clinical development times (CDTs) from filing investigational new drug application to marketing approval were determined. We examined 1956 orphan product designations from 1983 through 2008 and found 93 (4.8%) for IEMs. Of those, 24 (25.8%) received marketing approval. This proportion of approval was significantly (P = .036) higher than that for non-IEM orphan products (17%). Among the IEM products, disorders of complex molecules received the most designations and approvals (61 and 11, respectively). Among the subgroups, lysosomal storage diseases received the most designations and approvals (43 and 9, respectively), whereas mitochondrial diseases (other than fatty acid oxidation disorders) received 7 designations with no approvals. We then examined the CDTs for the approved IEM products and found a median of 6.4 years (range: 2.6-25.1 years). Biological products had significantly shorter CDTs than drugs (mean: 4.6 vs 11.0 years; P = .003). For 26 years, the Orphan Drug Act has generated new therapies for IEMs. Why some IEMs have motivated successful drug development and others have not remains enigmatic; yet the needs of IEM patients without treatment are a certainty.
Performance, Resources, and Complexity: A Systematic Approach to Microarchitectural Design
1989-05-01
Approved: ********************************** Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of...Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT VLSI design in general -- microprocessor design in particular...has been treated more like an art than a science in the past. The goal of this thesis is to explain the science of VLSI design to someone who wants
14 CFR 21.621 - Transferability and duration.
Code of Federal Regulations, 2011 CFR
2011-01-01
... published at 75 FR 9095, March 1, 2010. A TSO authorization or letter of TSO design approval issued under... as follows: § 21.621 Issue of letters of TSO design approval: Import articles. Pt. 21, Subpt. O, Nt... design approval. (b) For the purposes of this subpart— (1) A TSO issued by the FAA is a minimum...
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
14 CFR 25.3 - Special provisions for ETOPS type design approvals.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 180 minutes, an applicant must comply with § 25.1535, except that it need not comply with the... ETOPS type design approval of an airplane beyond 180 minutes an applicant must comply with § 25.1535. (c) Airplanes with more than two engines. An applicant for ETOPS type design approval must comply with § 25.1535...
14 CFR 25.3 - Special provisions for ETOPS type design approvals.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 180 minutes, an applicant must comply with § 25.1535, except that it need not comply with the... ETOPS type design approval of an airplane beyond 180 minutes an applicant must comply with § 25.1535. (c) Airplanes with more than two engines. An applicant for ETOPS type design approval must comply with § 25.1535...
14 CFR 25.3 - Special provisions for ETOPS type design approvals.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 180 minutes, an applicant must comply with § 25.1535, except that it need not comply with the... ETOPS type design approval of an airplane beyond 180 minutes an applicant must comply with § 25.1535. (c) Airplanes with more than two engines. An applicant for ETOPS type design approval must comply with § 25.1535...
14 CFR 25.3 - Special provisions for ETOPS type design approvals.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 180 minutes, an applicant must comply with § 25.1535, except that it need not comply with the... ETOPS type design approval of an airplane beyond 180 minutes an applicant must comply with § 25.1535. (c) Airplanes with more than two engines. An applicant for ETOPS type design approval must comply with § 25.1535...
14 CFR 25.3 - Special provisions for ETOPS type design approvals.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 180 minutes, an applicant must comply with § 25.1535, except that it need not comply with the... ETOPS type design approval of an airplane beyond 180 minutes an applicant must comply with § 25.1535. (c) Airplanes with more than two engines. An applicant for ETOPS type design approval must comply with § 25.1535...
1985-11-01
11.251 16 1 mAoop RESOLUT" TEST CHT t4A1109L 64JREAU OF STANDARS -163- 01FILE GOO! AD-AI181 235 AFVAL-TR-86-4006 Volume IV Par t 2 INTEGRATED...River Road Schenectady. New York 12345 Final Report for Period 22 September 1980 3 1 July 1985 November 1985 Approved for public release; distribution is... procurement operation, the United States Government thereby incurs no responsibility nor any obligation whatsoever, and the fact that the government may
2015-06-01
AWARD NUMBER: W81XWH-13-1-0053 TITLE: Application of FDA-Approved Memantine and Newer NitroMemantine Derivatives to Treat Neurological...2015 Final 1 May 2013 - 30 Apr 2015 Application of FDA-Approved Memantine and Newer NitroMemantine Derivatives to Treat Neurological Manifestations in...FDA-approved drug, Memantine , an uncompetitive/fast off-rate antagonist of the Nmethyl-D-aspartate-type glutamate receptor, and its improved
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
38 CFR 59.100 - Payment of grant award.
Code of Federal Regulations, 2010 CFR
2010-07-01
... engineering inspection approved by VA, must obtain VA approval of the final equipment list submitted by the... the internet Web site provided in § 59.170). The equipment list and the completed VA Form 10-0388-13...
38 CFR 59.100 - Payment of grant award.
Code of Federal Regulations, 2011 CFR
2011-07-01
... engineering inspection approved by VA, must obtain VA approval of the final equipment list submitted by the... the internet Web site provided in § 59.170). The equipment list and the completed VA Form 10-0388-13...
40 CFR 52.1679 - EPA-approved New York State regulations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... approval; no action taken on provisions that may require PSD permits for sources of greenhouse gas (GHG) emissions with emissions below the thresholds identified in EPA's final PSD and Title V GHG Tailoring Rule...
14 CFR 121.405 - Training program and revision: Initial and final approval.
Code of Federal Regulations, 2014 CFR
2014-01-01
... aids, devices, methods, and procedures listed in the certificate holder's curriculum as set forth in § 121.403 that increase the quality and effectiveness of the teaching-learning process. If approval of...
14 CFR 121.405 - Training program and revision: Initial and final approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... aids, devices, methods, and procedures listed in the certificate holder's curriculum as set forth in § 121.403 that increase the quality and effectiveness of the teaching-learning process. If approval of...
14 CFR 121.405 - Training program and revision: Initial and final approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... aids, devices, methods, and procedures listed in the certificate holder's curriculum as set forth in § 121.403 that increase the quality and effectiveness of the teaching-learning process. If approval of...
14 CFR 121.405 - Training program and revision: Initial and final approval.
Code of Federal Regulations, 2013 CFR
2013-01-01
... aids, devices, methods, and procedures listed in the certificate holder's curriculum as set forth in § 121.403 that increase the quality and effectiveness of the teaching-learning process. If approval of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... cost not paid at final endorsement, non-critical repairs and capital needs assessment. The mortgagor... Credit Examiner, Inspector, and Architect, must use information collected to approve the withdrawal of...
Code of Federal Regulations, 2011 CFR
2011-01-01
... standard design approval or early review of site suitability issues. 2.110 Section 2.110 Energy NUCLEAR... or early review of site suitability issues. (a)(1) A submittal for a standard design approval under... provisions of appendix Q to parts 50 of this chapter, a submittal for early review of site suitability issues...
Code of Federal Regulations, 2010 CFR
2010-01-01
... standard design approval or early review of site suitability issues. 2.110 Section 2.110 Energy NUCLEAR... or early review of site suitability issues. (a)(1) A submittal for a standard design approval under... provisions of appendix Q to parts 50 of this chapter, a submittal for early review of site suitability issues...
46 CFR 160.027-7 - Pre-approval tests for alternate platform designs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Pre-approval tests for alternate platform designs. 160... § 160.027-7 Pre-approval tests for alternate platform designs. (a) The tests in this section are for... deformation as a result of this test. (c) The float body must be supported so that the platform is suspended...
46 CFR 160.027-7 - Pre-approval tests for alternate platform designs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Pre-approval tests for alternate platform designs. 160... § 160.027-7 Pre-approval tests for alternate platform designs. (a) The tests in this section are for... deformation as a result of this test. (c) The float body must be supported so that the platform is suspended...
46 CFR 160.027-7 - Pre-approval tests for alternate platform designs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Pre-approval tests for alternate platform designs. 160... § 160.027-7 Pre-approval tests for alternate platform designs. (a) The tests in this section are for... deformation as a result of this test. (c) The float body must be supported so that the platform is suspended...
46 CFR 160.027-7 - Pre-approval tests for alternate platform designs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Pre-approval tests for alternate platform designs. 160... § 160.027-7 Pre-approval tests for alternate platform designs. (a) The tests in this section are for... deformation as a result of this test. (c) The float body must be supported so that the platform is suspended...
46 CFR 160.027-7 - Pre-approval tests for alternate platform designs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Pre-approval tests for alternate platform designs. 160... § 160.027-7 Pre-approval tests for alternate platform designs. (a) The tests in this section are for... deformation as a result of this test. (c) The float body must be supported so that the platform is suspended...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... Activities; Submission to OMB for Review and Approval; Comment Request; EPA's Design for the Environment (DfE... Budget (OMB) for review and approval: EPA's Design for the Environment (DfE) Partner of the Year Awards... . Title: EPA's Design for the Environment (DfE) Partner of the Year Awards Program. ICR Status: This is a...
1998-05-18
The Food and Drug Administration (FDA) is amending the regulations for delegations of authority to reflect a new delegation that authorizes the Division Directors, Office of Device Evaluation (ODE), Center for Devices and Radiological Health (CDRH) to approve, disapprove, or withdraw approval of product development protocols and applications for premarket approval for medical devices.
2008-07-10
The Food and Drug Administration (FDA) is amending its regulations on new drug applications (NDAs) and abbreviated new drug applications (ANDAs) for approval to market new drugs and generic drugs (drugs for which approval is sought in an ANDA). The final rule discontinues FDA's use of approvable letters and not approvable letters when taking action on marketing applications. Instead, we will send applicants a complete response letter to indicate that the review cycle for an application is complete and that the application is not ready for approval. We are also revising the regulations on extending the review cycle due to the submission of an amendment to an unapproved application and starting a new review cycle after the resubmission of an application following receipt of a complete response letter. In addition, we are adding to the regulations on biologics license applications (BLAs) provisions on the issuance of complete response letters to BLA applicants. We are taking these actions to implement the user fee performance goals referenced in the Prescription Drug User Fee Amendments of 2002 (PDUFA III) that address procedures and establish target timeframes for reviewing human drug applications.
Dental laboratory communication regarding removable dental prosthesis design in the UAE.
Haj-Ali, Reem; Al Quran, Firas; Adel, Omar
2012-07-01
The purpose of this study was to determine the methods dental practitioners in the United Arab Emirates (UAE) use to communicate cast removable dental prosthesis (RDP) design to dental laboratories; identify common practices taken by dentists/dental technicians prior to fabrication of RDP framework; and seek out dental technicians' attitudes toward their role in RDP design decisions. All dental laboratories (n = 28) listed in a local telephone directory were invited to complete a questionnaire through a face-to-face interview. They were also requested to examine RDP cases fabricated in the past 2 months and identify steps taken by dentists/dental technicians prior to fabrication of the framework. Descriptive statistics were used to report frequencies and percentages. Twenty-one (75%) dental laboratories agreed to participate, out of which 19 had the facilities to fabricate chrome-cobalt RDPs. Cast RDPs comprised approximately 4.04% (±2.67) of services provided. A reported 84.2% of dentists frequently communicate through generic lab script, with 89.5% rarely/never giving details regarding RDP design. While 52.6% of labs agree/strongly agree that it is the dentist's responsibility to decide the final RDP design, 94.7% agree/strongly agree that dentists should depend on dental technicians for design-making decisions. A total of 19 RDP cases were reviewed. All 19 were surveyed and designed by dental technicians but received dentist approval of design prior to fabrication. Thirteen (68.4%) had rest-seat preparations done by dentists after approval, and new impressions sent to the lab. No other tooth modifications were noted. The responsibility of RDP design appeared to be largely delegated to dental technicians. Importance of tooth modifications seemed to be undervalued and not completed prior to framework fabrication. © 2012 by the American College of Prosthodontists.
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
2015-09-01
first three months of the project, we successfully obtained approval for our Animal Component of Research Project (ACORP) from our local IACUC and...total number of animals . The approved ACORP and the amendment were submitted to ACURO for approval and final approval from the ACURO was secured on...the tibial plateau. The injury was produced using an “Instron” servohydraulic tester with the animal under inhalation anesthesia (3% isoflurane, 0.5
46 CFR 162.017-6 - Procedure for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... screens. (c) Pre-approval tests. Before approval is granted, the manufacturer shall have tests conducted, or submit evidence that such tests have been conducted, by the Underwriters' Laboratories, the... design or type of pressure-vacuum relief valve shall submit drawings in quadruplicate showing the design...
46 CFR 162.017-6 - Procedure for approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... screens. (c) Pre-approval tests. Before approval is granted, the manufacturer shall have tests conducted, or submit evidence that such tests have been conducted, by the Underwriters' Laboratories, the... design or type of pressure-vacuum relief valve shall submit drawings in quadruplicate showing the design...
State of California; Sacramento Metropolitan AQMD; Approval of Air Plan Revisions; VOC Emissions
EPA is taking final action to approve a revision to the Sacramento Metropolitan AQMD portion of the California State Implementation Plan (SIP), concerning volatile organic compound (VOC) emissions from Organic Chemical Manufacturing Operations.
76 FR 17032 - Forbearance Petition Filing Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Petition Filing Requirements AGENCY: Federal Communications Commission. ACTION: Final rule; confirmation of... Budget (OMB) had approved the associated information collection requirements. OMB approved those information collection requirements on April 5, 2010, under OMB Control Number 3060-1138. This document...
14 CFR 121.405 - Training program and revision: Initial and final approval.
Code of Federal Regulations, 2012 CFR
2012-01-01
... § 121.403 that increase the quality and effectiveness of the teaching-learning process. If approval of... transportation, he may, upon a statement of the reasons, require a change effective without stay. (f) Each...
78 FR 57213 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... of Projects Approved for Collection and Use: Traffic survey design. Terminal curbside canopy... update. Gulfstream Road/tunnel design. Airfield electrical vault design. Taxiway A design. Taxiway H design. Decision Date: September 18, 2012. FOR FURTHER INFORMATION CONTACT: Robert Rau, Atlanta Airports...
10 CFR 50.150 - Aircraft impact assessment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13, 2009; (B) Renewal of standard design certifications in effect on July 13, 2009 which have not..., standard design approval, or manufactured reactor; or (B) Reference a standard design certification issued... certification or standard design approval; or (B) Reference a standard design certification issued before July...
10 CFR 50.150 - Aircraft impact assessment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13, 2009; (B) Renewal of standard design certifications in effect on July 13, 2009 which have not..., standard design approval, or manufactured reactor; or (B) Reference a standard design certification issued... certification or standard design approval; or (B) Reference a standard design certification issued before July...
10 CFR 50.150 - Aircraft impact assessment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 13, 2009; (B) Renewal of standard design certifications in effect on July 13, 2009 which have not..., standard design approval, or manufactured reactor; or (B) Reference a standard design certification issued... certification or standard design approval; or (B) Reference a standard design certification issued before July...
10 CFR 50.150 - Aircraft impact assessment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 13, 2009; (B) Renewal of standard design certifications in effect on July 13, 2009 which have not..., standard design approval, or manufactured reactor; or (B) Reference a standard design certification issued... certification or standard design approval; or (B) Reference a standard design certification issued before July...
The Iodine Satellite (iSat) Project Development Towards Critical Design Review
NASA Technical Reports Server (NTRS)
Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence
2015-01-01
Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.
19 CFR 115.28 - Application for approval.
Code of Federal Regulations, 2013 CFR
2013-04-01
... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.28 Application for approval. Each application by a... inspection; and (e) A statement signed by the manufacturer that: (1) A container of the design type concerned...
19 CFR 115.28 - Application for approval.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.28 Application for approval. Each application by a... inspection; and (e) A statement signed by the manufacturer that: (1) A container of the design type concerned...
19 CFR 115.28 - Application for approval.
Code of Federal Regulations, 2012 CFR
2012-04-01
... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.28 Application for approval. Each application by a... inspection; and (e) A statement signed by the manufacturer that: (1) A container of the design type concerned...
19 CFR 115.28 - Application for approval.
Code of Federal Regulations, 2014 CFR
2014-04-01
... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.28 Application for approval. Each application by a... inspection; and (e) A statement signed by the manufacturer that: (1) A container of the design type concerned...
19 CFR 115.28 - Application for approval.
Code of Federal Regulations, 2011 CFR
2011-04-01
... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.28 Application for approval. Each application by a... inspection; and (e) A statement signed by the manufacturer that: (1) A container of the design type concerned...
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
75 FR 20965 - Petition for Approval of Alternate Odometer Disclosure Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-22
...The State of Wisconsin has petitioned for approval of alternate odometer requirements to certain requirements under Federal odometer law. NHTSA has initially determined that Wisconsin's alternate requirements satisfy Federal odometer law, with limited exceptions. Accordingly, NHTSA has preliminarily decided to grant Wisconsin's petition on condition that before NHTSA makes a final determination, Wisconsin amends its program to meet all the requirements of Federal odometer law or demonstrates that it meets the requirements of Federal law. This document is not a final agency action.
1984-02-06
MASS CASUALTY SITUATIONS FINAL REPORT for 0O FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 e FEMA WORK UNIT...20006 FINAL REPORT for FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 FEMA WORK UNIT NUMBER 2412G...February 1984 This repnrt has been reviewed in the Federal Emergency Management Agency and approved for publication. Approval does not signify that the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-19
...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.
25 CFR 224.75 - What must the Secretary do upon approval or disapproval of a final proposed TERA?
Code of Federal Regulations, 2011 CFR
2011-04-01
... INTERIOR ENERGY AND MINERALS TRIBAL ENERGY RESOURCE AGREEMENTS UNDER THE INDIAN TRIBAL ENERGY DEVELOPMENT AND SELF DETERMINATION ACT Approval of Tribal Energy Resource Agreements § 224.75 What must the...
25 CFR 224.75 - What must the Secretary do upon approval or disapproval of a final proposed TERA?
Code of Federal Regulations, 2010 CFR
2010-04-01
... INTERIOR ENERGY AND MINERALS TRIBAL ENERGY RESOURCE AGREEMENTS UNDER THE INDIAN TRIBAL ENERGY DEVELOPMENT AND SELF DETERMINATION ACT Approval of Tribal Energy Resource Agreements § 224.75 What must the...
77 FR 41680 - Indiana Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 914... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving amendments to the Indiana...
EPA is taking final action to approve a revision to the Northern Sierra Air Quality Management District (NSAQMD) portion of the California SIP concerning emissions of particulate matter (PM) from wood burning devices.
Spent nuclear fuel project cold vacuum drying facility operations manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
IRWIN, J.J.
This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less
Solar array module plasma interactions experiment (SAMPIE) - Science and technology objectives
NASA Technical Reports Server (NTRS)
Hillard, G. B.; Ferguson, Dale C.
1993-01-01
The solar array module plasma interactions experiment (SAMPIE) is an approved NASA flight experiment manifested for Shuttle deployment in early 1994. The SAMPIE experiment is designed to investigate the interaction of high voltage space power systems with ionospheric plasma. To study the behavior of solar cells, a number of solar cell coupons (representing design technologies of current interest) will be biased to high voltages to measure both arcing and current collection. Various theories of arc suppression will be tested by including several specially modified cell coupons. Finally, SAMPIE will include experiments to study the basic nature of arcing and current collection. This paper describes the rationale for a space flight experiment, the measurements to be made, and the significance of the expected results. A future paper will present a detailed discussion of the engineering design.
40 CFR 35.2050 - Effect of approval or certification of documents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... specifications for transmission construction projects which are not based on RUS approved line design data or do... section, plans and specifications for transmission construction which use previously approved design data... transformer, and the transmission switchyard at a generating plant. Warehouses and equipment service buildings...
78 FR 57211 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... rehabilitation design. Taxiway/apron/fuel road pavement replacement. Taxiway/apron/fuel road pavement replacement... Description of Projects Approved for Collection and Use: Taxiway F improvements (design and construction). Drainage ditch improvements (design and construction). Apron C expansion (design and construction...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
...EPA is taking final action to approve a request submitted on December 18, 2009, and supplemented on December 22, 2010, from the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), to redesignate the Greensboro-Winston-Salem-High Point fine particulate matter (PM2.5) nonattainment area (hereafter the ``Greensboro Area'' or ``Area'') to attainment for the 1997 Annual PM2.5 National Ambient Air Quality Standards (NAAQS). The Greensboro Area is comprised of Davidson and Guilford Counties in their entireties. EPA's approval of the redesignation request is based on the determination that the State of North Carolina has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act), including the determination that the Greensboro Area has attained the 1997 Annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010. Additionally, EPA is approving a revision to the North Carolina State Implementation Plan (SIP) to include the 1997 Annual PM2.5 maintenance plan for the Greensboro Area that contains the new 2011 and 2021 motor vehicle emission budgets (MVEBs) for nitrogen oxides (NOX) and PM2.5 for both Davidson and Guilford Counties. This action also approves the emissions inventory submitted with the maintenance plan. Further, EPA is correcting a typographical error for the citation associated with a previous adequacy finding the Agency made for the NOX and PM2.5 MVEBs for both Davidson and Guilford Counties.
76 FR 9642 - Alabama Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...
78 FR 11579 - Texas Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...
77 FR 8144 - Texas Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-14
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving three...
78 FR 9807 - Utah Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We are approving an amendment to the Utah regulatory program (the ``Utah program'') under the Surface Mining...
76 FR 30008 - Alabama Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...
78 FR 11138 - Agency Information Collection Activities; OMB Approval Received
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2009-0070] Agency Information Collection Activities; OMB Approval Received AGENCY: Animal and Plant Health... in the Animal and Plant Health Inspection Service's final rule regarding the possession, use, and...
75 FR 81122 - Texas Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...
78 FR 18230 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... Airworthiness Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France... approved by the aviation authority of France and is approved for operation in the United States. Pursuant...
78 FR 25380 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... Airworthiness Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France... Determination These helicopters have been approved by the aviation authority of France and are approved for...
78 FR 857 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
... Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France (Eurocopter... been approved by the aviation authority of France and are approved for operation in the United States...
NUSC Technical Publications Guide.
1985-05-01
Facility personnel especially that of A. Castelluzzo, E. Deland, J. Gesel , and E. Szlosek (all of Code 4343). Reviewed and Approved: 14 July 1980 D...their technical content and format. Review and approve the manual outline, the review manuscript, and the final camera - reproducible copy. Conduct in
77 FR 58025 - Texas Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2014 CFR
2014-07-01
... approved machines will be accepted in lieu of certified components. (b) A single layout drawing (see Figure... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
Safety impacts of Design Exceptions in Utah
DOT National Transportation Integrated Search
2012-06-01
The objective of this research was to compare safety, measured by expected crash frequency and severity, on road segments where design exceptions were approved and constructed to similar road segments where no design exceptions were approved or const...
Safety Impacts of Design Exceptions in Utah
DOT National Transportation Integrated Search
2012-08-01
The objective of this research was to compare safety, measured by expected crash frequency and severity, on road segments where design exceptions were approved and constructed to similar road segments where no design exceptions were approved or const...
7 CFR 1940.321 - Use of completed EIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... final EIS will be a major factor in the Agency's final decision. Agency staff making recommendations on...-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED... subpart and provide them to the approving official prior to a final decision. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Project (RDEP) Record of Decision (ROD)/approved Resource Management Plan (RMP) amendments for BLM... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZ910000.L13400000.DT0000.LXSS058A0000] Notice of Availability of the Restoration Design Energy Project Record of Decision/Approved Resource...
48 CFR 227.7107-3 - Approval of restricted designs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Approval of restricted designs. 227.7107-3 Section 227.7107-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-3 Approval of...
46 CFR 160.170-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design, material, or construction change. 160.170-23 Section 160.170-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Davit-Launched Liferaft Automatic Release Hooks ...
48 CFR 227.7107-3 - Approval of restricted designs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Approval of restricted designs. 227.7107-3 Section 227.7107-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-3 Approval of...
46 CFR 160.170-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design, material, or construction change. 160.170-23 Section 160.170-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Davit-Launched Liferaft Automatic Release Hooks ...
Code of Federal Regulations, 2010 CFR
2010-01-01
... approved by the Administrator, APHIS on recommendations of State authorities; facilities. 72.16 Section 72... CATTLE § 72.16 Designated dipping stations to be approved by the Administrator, APHIS on recommendations of State authorities; facilities. When deemed advisable and upon recommendation by the proper...
30 CFR 250.904 - What is the Platform Approval Program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... these requirements will satisfy MMS criteria for approval of fixed platforms of a proven design that... approval for a floating platform; a platform of unique design; or a platform being installed in deepwater (> 400 ft.) or a frontier area, you must also meet the requirements of the Platform Verification Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; Commonwealth of Virginia... Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION... request for EPA withdrawal of its section 111(d)/129 plan (the plan) approval for HMIWI units. Submittal...
49 CFR 107.402 - Application for designation as an approval or certification agency.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business is in a country other than the United States, a copy of the designation from the Competent Authority of that country delegating to the applicant an approval or designated agency authority for the... include: (i) The ability to review and evaluate design drawings, design and stress calculations; (ii) A...
75 FR 13336 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Approved for Collection at Key West International Airport (EYW) and Use at EYW: Runway safety area design. Runway safety area construction. Approach clearing--design. Runway obstruction clearing--design. Runway obstruction clearing, phase II--construction. Noise implementation plan, phase 6--design. Noise implementation...
NASA Astrophysics Data System (ADS)
Francis, Olivier; Klein, Gilbert; Baumann, Henri; Dando, Nicolas; Tracey, Ray; Ullrich, Christian; Castelein, Stefaan; Hua, Hu; Kang, Wu; Chongyang, Shen; Songbo, Xuan; Hongbo, Tan; Zhengyuan, Li; Pálinkás, Vojtech; Kostelecký, Jakub; Mäkinen, Jaakko; Näränen, Jyri; Merlet, Sébastien; Farah, Tristan; Guerlin, Christine; Pereira Dos Santos, Franck; Le Moigne, Nicolas; Champollion, Cédric; Deville, Sabrina; Timmen, Ludger; Falk, Reinhard; Wilmes, Herbert; Iacovone, Domenico; Baccaro, Francesco; Germak, Alessandro; Biolcati, Emanuele; Krynski, Jan; Sekowski, Marcin; Olszak, Tomasz; Pachuta, Andrzej; Agren, Jonas; Engfeldt, Andreas; Reudink, René; Inacio, Pedro; McLaughlin, Daniel; Shannon, Geoff; Eckl, Marc; Wilkins, Tim; van Westrum, Derek; Billson, Ryan
2012-01-01
During November 2011 a EURAMET key comparison of absolute gravimeters was organized in the Underground Laboratory for Geodynamics in Walferdange, Luxemburg. The comparison assembled 22 participants coming from 16 countries and four different continents. The comparison was divided into two parts: a key comparison that included six National Metrology Institutes or Designated Institutes, and a pilot study including all participants. The global result given by the pilot study confirms that all instruments are absolutely coherent with each other. The results obtained in the key comparison confirm a good agreement between the NMI instruments. Finally, a link to ICAG-2009 shows also that the NMI gravimeters are stable in time. Main text. To reach the main text of this paper, click on Final Report. Note that this text is that which appears in Appendix B of the BIPM key comparison database kcdb.bipm.org/. The final report has been peer-reviewed and approved for publication by the CCM, according to the provisions of the CIPM Mutual Recognition Arrangement (CIPM MRA).
Ríos, Pedro Rizo; Rivera, Aurora González; Oropeza, Itzel Rivas; Rivas Bocanegra, Ruth E
2013-12-01
The high costs generated by the current epidemiological profile and the introduction of new technologies, impact on public health systems, this situation is complicated when the health budget is low and causes the drug to be paid by the patient's pocket. In this situation it is necessary to design strategies that strengthen the approval of drugs that will be used in public health institutions in Mexico. To describe the results of the drug approval process for use in public health institutions to ensure the efficacy, safety, and efficiency of health technologies used in public health institutions in Mexico. We conducted a cross-sectional drug approval process, from September 2011 to December 2012, with a descriptive analysis for each stage in the process considered. Of the 394 applications received for approval of health technology, 244 (62%) were for drugs; of these, 151 (62%) met the requirements for evaluation (32% and 68% were modifications inclusions), finally was approved of 42% (61% of the changes and 33% of inclusions). The 73% of the applications were for consensus approval, 12% were conditioned at low price and 6% were approved by majority vote. The main reasons for refusal were lack of clinical evidence (31%) and methodological problems in the economic evaluation (27%). The strengthening of the process was conducted with methodological rigor based on critical analysis of scientific evidence, with transparency and legitimacy under a legal framework to promote resource optimization. The highest percentage of requests was for drugs which are the most commonly used therapeutic technology; for this reason it requires a proper selection process to ensure greater health benefit that ensures efficient use of economic resources. The economic evaluation was a support tool to consider in addition to price, the value of health determined by the quality of evidence, establishing a GDP per capita as a threshold to define a drug as an efficient alternative. © 2013 International Society for Pharmacoeconomics and Outcomes Research (ISPOR) Published by International Society for Pharmacoeconomics and Outcomes Research (ISPOR) All rights reserved.
CSAPR June Revisions Rule (77 FR 34830)
EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).
29 CFR 1952.204 - Final approval determination.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Minnesota § 1952.204... Information System, the Assistant Secretary evaluated actual operations under the Minnesota State plan for a... opportunity for public comment, the Assistant Secretary determined that in operation the State of Minnesota's...
29 CFR 1952.204 - Final approval determination.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Minnesota § 1952.204... Information System, the Assistant Secretary evaluated actual operations under the Minnesota State plan for a... opportunity for public comment, the Assistant Secretary determined that in operation the State of Minnesota's...
29 CFR 1952.204 - Final approval determination.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Minnesota § 1952.204... Information System, the Assistant Secretary evaluated actual operations under the Minnesota State plan for a... opportunity for public comment, the Assistant Secretary determined that in operation the State of Minnesota's...
29 CFR 1952.204 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Minnesota § 1952.204... Information System, the Assistant Secretary evaluated actual operations under the Minnesota State plan for a... opportunity for public comment, the Assistant Secretary determined that in operation the State of Minnesota's...
23 CFR 710.503 - Protective buying and hardship acquisition.
Code of Federal Regulations, 2013 CFR
2013-04-01
... hardship acquisition. (a) General conditions. Prior to the STD obtaining final environmental approval, the STD may request FHWA agreement to provide reimbursement for advance acquisition of a particular parcel... the currently approved STIP; (2) The STD has complied with applicable public involvement requirements...
23 CFR 710.503 - Protective buying and hardship acquisition.
Code of Federal Regulations, 2011 CFR
2011-04-01
... hardship acquisition. (a) General conditions. Prior to the STD obtaining final environmental approval, the STD may request FHWA agreement to provide reimbursement for advance acquisition of a particular parcel... the currently approved STIP; (2) The STD has complied with applicable public involvement requirements...
23 CFR 710.503 - Protective buying and hardship acquisition.
Code of Federal Regulations, 2014 CFR
2014-04-01
... hardship acquisition. (a) General conditions. Prior to the STD obtaining final environmental approval, the STD may request FHWA agreement to provide reimbursement for advance acquisition of a particular parcel... the currently approved STIP; (2) The STD has complied with applicable public involvement requirements...
Assessment of Regional Explosion Discriminants Using Data Sets of Unparalleled Spatial Sampling
2012-10-31
Air Force Research Laboratory AFRL ...Final Report APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED. AIR FORCE RESEARCH LABORATORY Space Vehicles...Directorate 3550 Aberdeen Ave SE AIR FORCE MATERIEL COMMAND KIRTLAND AIR FORCE BASE, NM 87117-5776 Approved for public release; distribution
EPA is taking final action to approve a revision to the YSAQMD portion of the California SIP concerning YSAQMD negative declarations for several VOC source categories included in its RACT State Implementation Plan Analysis.
32 CFR 806b.7 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...
32 CFR 806b.7 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...
32 CFR 806b.7 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...
32 CFR 806b.7 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...
36 CFR 9.86 - Application review process and approval standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... review process and approval standards. (a) The Regional Director will review applications submitted... applicable laws, Executive Orders and regulations, the Regional Director will promptly notify the AMRAP agency coordinator of the anticipated date of a final decision. (b) The Regional Director is responsible...
36 CFR 9.86 - Application review process and approval standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... review process and approval standards. (a) The Regional Director will review applications submitted... applicable laws, Executive Orders and regulations, the Regional Director will promptly notify the AMRAP agency coordinator of the anticipated date of a final decision. (b) The Regional Director is responsible...
12 CFR 1815.105 - Major decision points.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ENVIRONMENTAL QUALITY § 1815.105 Major decision points. (a) The possible environmental effects of an Application... decisionmaking process: (1) Preliminary approval stage, at which point applications are selected for funding; and (2) Final approval and funding stage. (b) Environmental review shall be integrated into the...
12 CFR 1815.105 - Major decision points.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ENVIRONMENTAL QUALITY § 1815.105 Major decision points. (a) The possible environmental effects of an Application... decisionmaking process: (1) Preliminary approval stage, at which point applications are selected for funding; and (2) Final approval and funding stage. (b) Environmental review shall be integrated into the...
12 CFR 1815.105 - Major decision points.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ENVIRONMENTAL QUALITY § 1815.105 Major decision points. (a) The possible environmental effects of an Application... decisionmaking process: (1) Preliminary approval stage, at which point applications are selected for funding; and (2) Final approval and funding stage. (b) Environmental review shall be integrated into the...
40 CFR 272.1851 - Oklahoma State-administered program: Final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Oklahoma § 272.1851...)(1)(i) of this section are incorporated by reference as part of the hazardous waste management... Approved Oklahoma Statutory and Regulatory Requirements Applicable to the Hazardous Waste Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9301-4] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Maryland AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9665-2] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Florida AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9744-2] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Wyoming AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9504-4] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Arkansas AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9690-6] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Delaware AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting Regulation (CROMERR) was...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9504-3] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Montana AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9284-9] Cross-Media Electronic Reporting Regulation... (EPA). ACTION: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9504-5] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Indiana AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9818-3] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Arkansas AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9823-4] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Nevada AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
Validation of source approval of HMA surface mix aggregate : final report.
DOT National Transportation Integrated Search
2016-04-01
The main focus of this research project was to develop methodologies for the validation of source approval of hot : mix asphalt surface mix aggregate. In order to further enhance the validation process, a secondary focus was also to : create a spectr...
Federal Registers and fact sheets on EPA approving the State of Louisiana's request to relax the federal Reid Vapor Pressure standard applicable to gasoline introduced into commerce in Grant Parish, Louisiana during the summer ozone control season.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-21
...)(5), (OO), (OO)(1), (OO)(2), (OO)(3), (OO)(4), (PP)(2), (UU)(3), (AAA), (DDD), and Appendix A. EPA is... Compounds from Stationary Sources, Paragraph (AAA), as adopted by Ohio on October 25, 2002, effective on...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2012 CFR
2012-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
Incentives for orphan drug research and development in the United States.
Seoane-Vazquez, Enrique; Rodriguez-Monguio, Rosa; Szeinbach, Sheryl L; Visaria, Jay
2008-12-16
The Orphan Drug Act (1983) established several incentives to encourage the development of orphan drugs (ODs) to treat rare diseases and conditions. This study analyzed the characteristics of OD designations, approvals, sponsors, and evaluated the effective patent and market exclusivity life of orphan new molecular entities (NMEs) approved in the US between 1983 and 2007. Primary data sources were the FDA Orange Book, the FDA Office of Orphan Drugs Development, and the US Patent and Trademark Office. Data included all orphan designations and approvals listed by the FDA and all NMEs approved by the FDA during the study period. The FDA listed 1,793 orphan designations and 322 approvals between 1983 and 2007. Cancer was the main group of diseases targeted for orphan approvals. Eighty-three companies concentrated 67.7% of the total orphan NMEs approvals. The average time from orphan designation to FDA approval was 4.0 +/- 3.3 years (mean +/- standard deviation). The average maximum effective patent and market exclusivity life was 11.7 +/- 5.0 years for orphan NME. OD market exclusivity increased the average maximum effective patent and market exclusivity life of ODs by 0.8 years. Public programs, federal regulations, and policies support orphan drugs R&D. Grants, research design support, FDA fee waivers, tax incentives, and orphan drug market exclusivity are the main incentives for orphan drug R&D. Although the 7-year orphan drug market exclusivity provision had a positive yet relatively modest overall effect on effective patent and market exclusivity life, economic incentives and public support mechanisms provide a platform for continued orphan drug development for a highly specialized market.
78 FR 37885 - Approval of American Society of Mechanical Engineers' Code Cases
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
...), standard design certifications, standard design approvals and manufacturing licenses, to use the Code Cases... by the ASME. The three RGs that would be incorporated by reference are RG 1.84, ``Design, Fabrication... nuclear power plant licensees, and applicants for CPs, OLs, COLs, standard design certifications, standard...
1991-08-28
This final rule implements section 428(a) of Public Law 100-360 which authorizes the imposition of civil money penalties for the use--in advertising, solicitations or other communications--of certain words, letters, symbols or emblems associated with the Department of Health and Human Services' Social Security and Medicare programs in a manner that the user knows, or should know, would convey a false impression that (1) the communicated item was approved, endorsed or authorized by the Department or its programs, or (2) the responsible person or organization has some connection with, or authorization from, the Department or these programs. This rulemaking is designed to assist in protecting citizens from misrepresentations concerning the services offered and programs administered by the Social Security Administration and the Health Care Financing Administration.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and Permits To Use Experimental Equipment § 18.81 Field modification of approved (permissible... alter the basic functional design that was originally approved for the equipment. (c) Upon receipt of...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and Permits To Use Experimental Equipment § 18.81 Field modification of approved (permissible... alter the basic functional design that was originally approved for the equipment. (c) Upon receipt of...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., and Permits To Use Experimental Equipment § 18.81 Field modification of approved (permissible... alter the basic functional design that was originally approved for the equipment. (c) Upon receipt of...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and Permits To Use Experimental Equipment § 18.81 Field modification of approved (permissible... alter the basic functional design that was originally approved for the equipment. (c) Upon receipt of...
46 CFR 160.133-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design, material, or construction change. 160.133-23 Section 160.133-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Release Mechanisms for Lifeboats and Rescue Boats §...
46 CFR 160.077-7 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design or material revision. 160.077-7 Section 160.077-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hybrid Inflatable Personal Flotation Devices § 160.077-7 Procedure...
46 CFR 160.133-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design, material, or construction change. 160.133-23 Section 160.133-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Release Mechanisms for Lifeboats and Rescue Boats ...
46 CFR 160.077-7 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design or material revision. 160.077-7 Section 160.077-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hybrid Inflatable Personal Flotation Devices § 160.077-7 Procedure...
46 CFR 160.077-7 - Procedure for approval of design or material revision.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Procedure for approval of design or material revision. 160.077-7 Section 160.077-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hybrid Inflatable Personal Flotation Devices § 160.077-7 Procedure...
46 CFR 160.156-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design, material, or construction change. 160.156-23 Section 160.156-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boats and Fast Rescue Boats (SOLAS) § 160.156...
46 CFR 160.156-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for approval of design, material, or construction change. 160.156-23 Section 160.156-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boats and Fast Rescue Boats (SOLAS) § 160.156...
46 CFR 160.135-23 - Procedure for approval of design, material, or construction change.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for approval of design, material, or construction change. 160.135-23 Section 160.135-23 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Lifeboats (SOLAS) § 160.135-23 Procedure for approva...
30 CFR 250.905 - How do I get approval for the installation, modification, or repair of my platform?
Code of Federal Regulations, 2012 CFR
2012-07-01
... CONTINENTAL SHELF Platforms and Structures Platform Approval Program § 250.905 How do I get approval for the...) Application cover letter Proposed structure designation, lease number, area, name, and block number, and the type of facility your facility (e.g., drilling, production, quarters). The structure designation must...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cook, Neville G.W.; Heuze, Francois E.; Miller, Hamish D.S.
1993-03-01
The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the referencemore » design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
...EPA is approving those revisions adopted by the State of Colorado on April 16, 2004 to Regulation No. 3 (Stationary Source Permitting and Air Pollutant Emission Notice Requirements) that incorporate EPA's December 31, 2002 NSR Reforms. Colorado submitted the request for approval of these rule revisions into the State Implementation Plan (SIP) on July 11, 2005 and supplemented its request on October 25, 2005. EPA is approving only the portions of Colorado's revisions to Regulation Number 3 that relate to the prevention of significant deterioration (PSD) and non-attainment new source review (NSR) construction permit programs of the State of Colorado. Other revisions, renumberings, additions, or deletions to Regulation No. 3 made by Colorado as part of the April 16, 2004 final rulemaking are being acted on by EPA in a separate final action related to Colorado's Interstate Transport SIP (see proposed action at 76 FR 21835, April 19, 2011). Colorado has a federally approved NSR program for new and modified sources impacting attainment and non-attainment areas in the State. This action is being taken under section 110 of the Clean Air Act (CAA).
77 FR 5183 - Review and Approval of Existing Ordinances or Resolutions; Repeal
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Part 523 RIN 3141-AA45 Review and Approval of Existing Ordinances or Resolutions; Repeal AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY: The National Indian Gaming Commission is repealing obsolete regulations...
7 CFR 622.32 - Reviews and approvals.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Planning § 622.32 Reviews and approvals. (a) The watershed plan-environmental impact statement (or assessment) will be subject to internal technical reviews..., and a final review as stated in NRCS's National Watersheds Manual. (b) After thorough review by NRCS...
7 CFR 622.32 - Reviews and approvals.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Planning § 622.32 Reviews and approvals. (a) The watershed plan-environmental impact statement (or assessment) will be subject to internal technical reviews..., and a final review as stated in NRCS's National Watersheds Manual. (b) After thorough review by NRCS...
7 CFR 622.32 - Reviews and approvals.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Planning § 622.32 Reviews and approvals. (a) The watershed plan-environmental impact statement (or assessment) will be subject to internal technical reviews..., and a final review as stated in NRCS's National Watersheds Manual. (b) After thorough review by NRCS...
7 CFR 622.32 - Reviews and approvals.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Planning § 622.32 Reviews and approvals. (a) The watershed plan-environmental impact statement (or assessment) will be subject to internal technical reviews..., and a final review as stated in NRCS's National Watersheds Manual. (b) After thorough review by NRCS...
7 CFR 622.32 - Reviews and approvals.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Planning § 622.32 Reviews and approvals. (a) The watershed plan-environmental impact statement (or assessment) will be subject to internal technical reviews..., and a final review as stated in NRCS's National Watersheds Manual. (b) After thorough review by NRCS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2010-0770; FRL-9466-5] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for Preconstruction Review, Prevention of Significant Deterioration AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... ENVIRONMENTAL PROTECTION AGENCY [FRL9752-3] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Vermont AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9301-5] Cross-Media Electronic Reporting: Authorized Program Revision/ Modification Approvals, State of South Dakota AGENCY: Environmental Protection Agency (EPA...: On October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the...
76 FR 30342 - Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Ohio
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9311-3] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Ohio AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal...
77 FR 13123 - Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Ohio
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9642-8] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Ohio AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9447-2] Cross-Media Electronic Reporting: Authorized Program Revision Approvals, Commonwealth of Kentucky AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-26
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9217-6] Cross-Media Electronic Reporting Rule State...: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media Electronic..., NW., Washington, DC 20460. SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9690-5] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Illinois AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-29
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9293-7] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Illinois AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY... final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal Register (70 FR 59848...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9226-9] Cross-Media Electronic Reporting Rule State...: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media Electronic..., NW., Washington, DC 20460. SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media...
Validation of source approval of HMA surface mix aggregate using spectrometer : final report.
DOT National Transportation Integrated Search
2016-04-01
The main focus of this research project was to develop methodologies for the validation of source approval of hot : mix asphalt surface mix aggregate. In order to further enhance the validation process, a secondary focus was also to : create a spectr...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... Composite Rotorcraft Structures; OMB Approval of Information Collection AGENCY: Federal Aviation... requirement contained in the FAA's final rule, ``Damage Tolerance and Fatigue Evaluation of Composite... and Fatigue Evaluation of Composite Rotorcraft Structures,'' published in the Federal Register (76 FR...
7 CFR 1737.92 - Loan documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Loan documents. 1737.92 Section 1737.92 Agriculture... PRE-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED TELECOMMUNICATIONS LOANS Final Loan Approval Procedures § 1737.92 Loan documents. Following approval of the loan, RUS shall forward the...
76 FR 33651 - Approval and Promulgation of Implementation Plans; ID
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2007-0406, FRL-9316-7] Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... provide the Idaho Department of Environmental Quality (IDEQ) the regulatory authority to address regional...
78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...
76 FR 1367 - Petition for Approval of Alternate Odometer Disclosure Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-10
...The State of Wisconsin has petitioned for approval of alternate requirements to certain requirements under Federal odometer law. NHTSA is issuing this final determination granting Wisconsin's petition as it pertains to vehicle transfers. This determination does not include vehicles covered by a lease agreement.
78 FR 32077 - List of Approved Spent Fuel Storage Casks: MAGNASTOR® System
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
... Fuel Storage Casks: MAGNASTOR[supreg] System AGENCY: Nuclear Regulatory Commission. ACTION: Direct... final rule that would have revised its spent fuel storage regulations to include Amendment No. 3 to... All-purpose Storage (MAGNASTOR[supreg]) System listing within the ``List of Approved Spent Fuel...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland to establish transportation conformity regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a...
40 CFR 272.2501 - Wisconsin State-administered program; final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501... cited in this paragraph are incorporated by reference as part of the hazardous waste management program... Applicable to the Hazardous Waste Management Program, (dated August 9, 1993). (2) EPA Approved Wisconsin...
7 CFR 1940.316 - Responsible officials for the environmental review process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... submitted to the approval official for final determinations. The SEC will review the assessment and provide... adequacy of the assessment or the recommendations reached, the State Director, whether or not the approving... Law 103-354 official responsible for executing the environmental impact determination and...
Oral vaccination of fish: Lessons from humans and veterinary species.
Embregts, Carmen W E; Forlenza, Maria
2016-11-01
The limited number of oral vaccines currently approved for use in humans and veterinary species clearly illustrates that development of efficacious and safe oral vaccines has been a challenge not only for fish immunologists. The insufficient efficacy of oral vaccines is partly due to antigen breakdown in the harsh gastric environment, but also to the high tolerogenic gut environment and to inadequate vaccine design. In this review we discuss current approaches used to develop oral vaccines for mass vaccination of farmed fish species. Furthermore, using various examples from the human and veterinary vaccine development, we propose additional approaches to fish vaccine design also considering recent advances in fish mucosal immunology and novel molecular tools. Finally, we discuss the pros and cons of using the zebrafish as a pre-screening animal model to potentially speed up vaccine design and testing for aquaculture fish species. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
14 CFR 21.97 - Approval of major changes in type design.
Code of Federal Regulations, 2011 CFR
2011-01-01
... necessary descriptive data for inclusion in the type design the other configurations of the same engine type... for approval of a major change in type design must— (1) Provide substantiating data and necessary descriptive data for inclusion in the type design; (2) Show that the changed product complies with the...
14 CFR 21.97 - Approval of major changes in type design.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... (a) An applicant for approval of a major change in type design must— (1) Provide substantiating data and necessary descriptive data for inclusion in the type design; (2) Show that the changed product... the necessary descriptive data for inclusion in the type design the other configurations of the same...
14 CFR 21.97 - Approval of major changes in type design.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must submit substantiating data and necessary descriptive data for inclusion in the type design. (b... major change in type design must— (1) Provide substantiating data and necessary descriptive data for... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Approval of major changes in type design...
46 CFR 160.077-6 - Approval procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-5 and 159.005-7 may be omitted if a similar design has already been approved. (2) The information... PFD of sufficiently similar design. (2) Engineering analysis showing that the test is not applicable... III) that the PFD is designed to provide. (ii) Any special purpose(s) for which the PFD is designed...