Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; proposed incidental harassment... specified activity includes all or part of the following actions, dependent on final funding levels: Removal... regularly found within the action area. Two Steller sea lions [[Page 56174
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... experimental design, duration of the study, and the method of barred owl removal. Background The Service listed... and nonlethal), and the type of experimental design (demography vs. occupancy). All action...-FF01E00000] Experimental Removal of Barred Owls To Benefit Threatened Northern Spotted Owls; Final...
75 FR 65227 - Revocation of Class E Airspace; Franklin, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
...-0603; Airspace Docket No. 10-ASW-9] Revocation of Class E Airspace; Franklin, TX AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action removes Class E airspace for... published in the Federal Register a notice of proposed rulemaking to remove Class E airspace for Franklin...
75 FR 17857 - Removal of Obsolete References to Herbicides Containing Dioxin
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... Herbicides Containing Dioxin AGENCY: Department of Veterans Affairs. ACTION: Final rule. SUMMARY: The... health effects of exposure to herbicides containing dioxin and radiation to remove the obsolete references to herbicides containing dioxin. This final rule reflects changes made by the Agent Orange Act of...
76 FR 28887 - Revocation of Class E Airspace; Ozark, MO
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-19
...-0432; Airspace Docket No. 11-ACE-8] Revocation of Class E Airspace; Ozark, MO AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action removes Class E airspace at Ozark, MO... Regulations (14 CFR) Part 71 by removing Class E airspace in the Ozark, MO, area. Abandonment of the former...
Direct Final Rule for Exhaust Emission Standards for 2012 and Later Model Year Snowmobiles
In this action removing the NOX component from the Phase 3 emission standard calculation and deferring action on the 2012 CO and HC emission standards portion of the court’s remand to a separate rulemaking action.
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2010 CFR
2010-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...). The Proposed Action includes the decontamination and decommissioning of the waste storage tanks and... site facilities identified in the Final EIS would be removed; contaminated soil, sediment, and...
75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
.... The publication of this action is part of a Court-approved joint motion to stay pending litigation...), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Final rule. SUMMARY: Through this action, NMFS removes a regulatory exemption for midwater trawl herring vessels, which was originally...
78 FR 40959 - Removing Unnecessary Office on Violence Against Women Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
.... VAWA was designed to improve criminal justice system responses to domestic violence, sexual assault... Office on Violence Against Women Regulations AGENCY: Office on Violence Against Women, Justice. ACTION: Final rule. SUMMARY: This rule removes the regulations for the STOP Violence Against Indian Women...
Code of Federal Regulations, 2010 CFR
2010-04-01
... appraiser; (vi) Being issued a final debarment, suspension, or limited denial of participation; (vii... you have been issued a final debarment, suspension, or limited denial of participation, in which case...) Automatic removal for issuance of final debarment, suspension, or limited denial of participation. If you...
2018-01-23
The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
The decision document presents the selected remedial action for the Standard Steel and Metals Salvage Yard, in Anchorage, Alaska. This is the final remedial action for the site. The site was not divided into operable units. The Removal Action utilized treatment as a principle element for the principle sources.
77 FR 54805 - Revocation of Jet Route J-528; WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2012-0749; Airspace Docket No. 11-ANM-29] RIN 2120-AA66 Revocation of Jet Route J-528; WA AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action removes Jet Route J-528...
75 FR 65228 - Revocation of Class E Airspace; Chilicothe, MO
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
...-0268; Airspace Docket No. 10-ACE-2] Revocation of Class E Airspace; Chilicothe, MO AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action removes Class E airspace for Chilicothe, MO. Airport management and air traffic control facility managers have determined that the Class E...
75 FR 51420 - Removing Regulations Implementing the Fish and Wildlife Conservation Act
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 83 [Docket No. FWS-R9-WSR-2010... and Wildlife Conservation Act AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), are removing our regulations implementing the Fish...
78 FR 55171 - Removal of Standards of Ethical Conduct Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
... Ethical Conduct Regulations AGENCY: Special Inspector General for Iraq Reconstruction. ACTION: Final rule... concurrence of the Office of Government Ethics (OGE), issued a final rule for employees of the SIGIR that supplemented the executive-branch-wide Standards of Ethical Conduct (Standards) issued by OGE. With certain...
78 FR 63380 - Amendment of Class E Airspace; St. George, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
...-0600; Airspace Docket No. 13-ANM-18] Amendment of Class E Airspace; St. George, UT AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class E airspace at St. George Municipal Airport, St. George, UT, by removing the operating hours established by a Notice to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [Docket No. FWS-R3-ES-2010... Threatened Wildlife AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule; notice of availability... of 1973, as amended (Act), we, the U.S. Fish and Wildlife Service (Service), are removing the Lake...
This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Licking Economic Action Development Study (LEADS) Head Start School in Buckeye Lake, Ohio. The objectives of the project were to evaluate...
Updating OSHA standards based on national consensus standards. Direct final rule.
2007-12-14
In this direct final rule, the Agency is removing several references to consensus standards that have requirements that duplicate, or are comparable to, other OSHA rules; this action includes correcting a paragraph citation in one of these OSHA rules. The Agency also is removing a reference to American Welding Society standard A3.0-1969 ("Terms and Definitions") in its general-industry welding standards. This rulemaking is a continuation of OSHA's ongoing effort to update references to consensus and industry standards used throughout its rules.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
...-0248; Airspace Docket No. 10-ANE-10] Revocation of Class E Airspace, Brunswick, ME; and Establishment of Class E Airspace, Wiscasset, ME AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action removes Class E Airspace at Brunswick NAS, Brunswick, ME, as the airport has...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-04
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [Docket No. FWS-R5-ES-2013...; Reinstatement of Removal of the Virginia Northern Flying Squirrel From the List of Endangered and Threatened Wildlife AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY: We, the U.S. Fish and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-23
... DEPARTMENT OF JUSTICE 28 CFR Part 26 [Docket No. OJP 1464; AG Order No.] RIN 1121-AA76 Office of... AGENCY: Department of Justice. ACTION: Final rule. SUMMARY: Pursuant to the USA PATRIOT Improvement and Reauthorization Act of 2005, the Department of Justice promulgated a final rule to implement certification...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
76 FR 62630 - Information Security Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... CENTRAL INTELLIGENCE AGENCY 32 CFR Part 1902 Information Security Regulations AGENCY: Central Intelligence Agency. ACTION: Final rule. SUMMARY: The Central Intelligence agency is removing certain information security regulations which have become outdated. The Executive Order upon which the regulations...
77 FR 25874 - Pennsylvania Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Final rule; removal of required amendment... regulatory program (the ``Pennsylvania program'') regulations under the Surface Mining Control and...
77 FR 40796 - Wyoming Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Final rule. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are removing a disapproval codified in OSM regulations...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
78 FR 42451 - Animal Feeds Contaminated With Salmonella Microorganisms
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Part 500 [Docket No. FDA-2013-N-0253] Animal Feeds Contaminated With Salmonella Microorganisms AGENCY: Food and Drug Administration, HHS. ACTION: Final rule; removal. SUMMARY: The Food and Drug Administration (FDA or Agency) is...
78 FR 63875 - Progress Reports Rules Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Reports Rules Revision AGENCY: Bureau of Prisons, Justice. ACTION: Final rule. SUMMARY: In this document, the Bureau of Prisons (Bureau) removes from regulations and/or modifies two types of progress reports: transfer reports and triennial reports. DATES: This rule is effective on November 25, 2013. FOR FURTHER...
2016-02-12
The Food and Drug Administration (FDA, the Agency, or we) is removing two regulations that prescribe procedures for FDA's review and classification of biological products licensed before July 1, 1972. FDA is taking this action because the two regulations are obsolete and no longer necessary in light of other statutory and regulatory authorities established since 1972, which allow FDA to evaluate and monitor the safety and effectiveness of all biological products. In addition, other statutory and regulatory authorities authorize FDA to revoke a license for biological products because they are not safe and effective, or are misbranded. FDA is taking this action as part of its retrospective review of its regulations to promote improvement and innovation.
The number of confirmed releases of petroleum products from underground storage tank (UST) systems has increased significantly since promulgation of the final UST regulations by the U.S. Environmental Protection Agency in December 1988. This increase has outpaced the resources of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
... DEPARTMENT OF LABOR Occupational Safety and Health Administration [Docket No. OSHA-2007-0039... Recognition AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Notice. SUMMARY: This notice announces the Occupational Safety and Health Administration's final decision expanding the scope...
75 FR 59933 - Specifications and Drawings for Construction of Direct Buried Plant
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... for Construction of Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Final rule..., Specifications and Drawings for Construction of Direct Buried Plant (Form 515a). The revised specifications will include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-21
... NATIONAL SCIENCE FOUNDATION 45 CFR Part 680 RIN 3145-AA51 National Science Foundation Rules of Practice and Statutory Conflict-of-Interest Exemptions AGENCY: National Science Foundation. ACTION: Final rule. SUMMARY: The National Science Foundation (NSF) is amending its regulations to remove the...
75 FR 27452 - Visitor Services
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... DEPARTMENT OF THE INTERIOR Bureau of Land Management 43 CFR Part 8360 [LLWO25000--L12200000.PM000--241A.00] RIN 1004-AD96 Visitor Services AGENCY: Bureau of Land Management, Interior. ACTION: Final rule. SUMMARY: The Bureau of Land Management (BLM) is amending its regulations to remove the Land and Water...
USEPA ARSENIC REMOVAL FULL-SCALE DEMONSTRATION PROGRAM
On October 31, 2001 EPA announced that the final standard for arsenic in drinking water of ten parts per billion (10 ppb) would become effective on February 22, 2002 without any further action by EPA. This means that the standard will be implemented as specified in the January 22...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
...We, the U.S. Fish and Wildlife Service (Service), propose to remove the island night lizard (Xantusia riversiana) from the Federal List of Endangered and Threatened Wildlife. This action is based on a review of the best available scientific and commercial information, which indicates that the species no longer meets the definition of endangered species or threatened species under the Endangered Species Act of 1973, as amended (Act). This proposed rule, if made final, would remove the island night lizard as a threatened species from the List of Endangered and Threatened Wildlife. This document also constitutes our 12-month finding on a petition to remove the island night lizard from the Federal List of Endangered and Threatened Wildlife.
77 FR 1670 - Gulf of Mexico Fishery Management Council (Council); Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
...) will review membership of the Spiny Lobster SSC and removal of Stone Crab Members; discuss replacement.... Shipp on the role of artificial reefs in fishery management. 1:30 p.m.-3 p.m.--The Spiny Lobster Management Committee will take Final Action on Spiny Lobster Amendment 11. --Recess-- Council Wednesday...
76 FR 68043 - Federal Acquisition Regulation; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
...), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: This document... Acquisition Policy, Office of Governmentwide Policy. Therefore, DoD, GSA, and NASA amend 48 CFR parts 1 and 8...] 0 4. Amend section 8.501 by removing ``http://www.nm.blm.gov/www/amfo/ amfo_home.html'' and adding...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-09-18
The 81-acre Newsom Brothers/Old Reichhold site is in Marion County, Columbia, Mississippi. Site activities included producing tall oils, turpentine, calcium and zinc resinates, and polymerized and rubber resins. Furthermore, PCP was apparently mixed with diesel oil and sold, and xylenes were used in a number of processes. A State investigation in 1976 revealed that waste water containing phenols, oil, and grease was discharging to a small creek. Further investigations resulted in EPA performing an immediate removal action in 1984, which included the removal of over 600 surface drums from the site and excavating and draining two ponds, one of whichmore » was subsequently filled with clean fill. Onsite buried drum areas were the target of another EPA removal action conducted in 1987-88. In addition there is an extensive system of concrete drains that served to collect and drain spilled wastes and rain water that has an area of runoff of approximately 300,000 square feet. The primary contaminants of concern in the soil, sediment, and bulked wastes are organics including PAHs, PCBs, and PCP, and metals.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... Differential Income Stream as an Application of the Income Method and as a Consideration in Assessing the Best Method AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final regulations and removal of... differential income stream as a consideration in assessing the best method in connection with a cost sharing...
The Performance of Maintenance Technicians on the Job. Final Report.
ERIC Educational Resources Information Center
Orlansky, J.; String, J.
This paper reviews data on one possible measure for evaluating the effectiveness of training for maintenance technicians, i.e., the unnecessary removal of non-faulty parts during actions taken to identify and correct malfunctions in equipment. Such data may be found in the maintenance management data systems of the military services. It was found…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... DEPARTMENT OF JUSTICE 28 CFR Part 26 [Docket No. OJP 1464; AG Order No. 3157-2010] RIN 1121-AA76... Rule AGENCY: Office of the Attorney General, Department of Justice. ACTION: Notice of proposed... of Justice promulgated a final rule to implement certification procedures for States seeking to...
77 FR 60622 - New Animal Drugs; Change of Sponsor's Address; Monensin; Spinosad; Tilmicosin
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
...; Tilmicosin AGENCY: Food and Drug Administration, HHS. ACTION: Final rule. SUMMARY: The Food and Drug... \\1\\ A Division of Eli (tilmicosin use in two-way, 558.618 Lilly & Co., Lilly phosphate) plus...) * * * (iv) Tilmicosin alone or in combination as in Sec. 558.618. * * * * * 0 7. In Sec. 558.618, remove and...
76 FR 1521 - Security Zone: Fleet Industrial Supply Center Pier, San Diego, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-11
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0423] RIN 1625-AA87 Security Zone: Fleet Industrial Supply Center Pier, San Diego, CA AGENCY: Coast Guard, DHS. ACTION: Final rule. SUMMARY: The Coast Guard is removing a security zone on the navigable waters of San Diego...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 75-acre Higgins Farm site is a former cattle farm in Franklin Township, Somerset County, New Jersey. During the 1960's, municipal sludge and penicillin waste were used as fertilizers on Higgins Farm. The site also contains three holding tanks and drums containing material removed from previous remedial investigations. In 1986, the owner excavated 50 containers, including drums; however, during excavation activities, some of the containers were punctured and their contents spilled onto the ground. The ROD addresses the final action for ground water to limit future migration of contaminated ground water to offsite areas, as OU2. The primary contaminants ofmore » concern affecting the ground water are VOCs, including benzene, PCE, TCE, and xylene.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... provider by overnight courier, for delivery the next business day. (f) Except as provided in paragraph (h...) Except as provided in paragraph (h) of this section, the decision to deny a provider's application or to remove a provider from the approved list shall take effect upon: (1) The expiration of the provider's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
NASA Technical Reports Server (NTRS)
1994-01-01
In planning for the long duration Apollo missions, NASA conducted extensive research into space food. One of the techniques developed was freeze drying. Action Products commercialized this technique, concentrating on snack food including the first freeze-dried ice cream. The foods are cooked, quickly frozen and then slowly heated in a vacuum chamber to remove the ice crystals formed by the freezing process. The final product retains 98 percent of its nutrition and weighs only 20 percent of its original weight. Action snacks are sold at museums, NASA facilities and are exported to a number of foreign countries. Sales run to several million dollars annually.
Charlie, K M; Kuttappa, M A; George, Liza; Manoj, K V; Joseph, Bobby; John, Nishin K
2018-01-01
The main objective is to evaluate the efficiency in removal of smear layer of mixture of tetracycline, acid and detergent (MTAD), sodium hypochlorite (NaOCl), ethylenediaminetetraacetic acid (EDTA) and chlorhexidine gluconate by scanning electron microscope (SEM) evaluation and also to evaluate the antimicrobial action of the same irrigants against standard culture strains of Enterococcus faecalis . This study included 60 extracted permanent teeth with single root canal. The sample was categorized into five groups with 12 teeth in each group. Root canals were enlarged till size 40 with K-files. One group was kept as control and irrigated only with saline. Other four groups used 5% NaOCl as irrigant during instrumentation and MTAD, 5% NaOCl, 17% EDTA, and 2% chlorhexidine gluconate as final rinse. Teeth were split and examined under SEM. To test the antibacterial action, the zone of inhibition method using agar plates was used. Obtained data were statistically analyzed by SPSS version 17 (SPSS Inc., Chicago, IL, USA). MTAD and 17% EDTA removed smear layer from all regions of the root canals. About 5% NaOCl and 2% chlorhexidine gluconate were ineffective in removing the smear layer. The mean zone of inhibition formed by the irrigants was in the following order; MTAD (40.5 mm), 2% chlorhexidine gluconate (29.375 mm), 17% EDTA (24.125 mm), 5% NaOCl (22.125 mm), and saline (zero). MTAD showed high smear layer removal efficacy, but no significant difference was found to that of 17% EDTA. As the dimensions of the zones of inhibition showed, MTAD has got highest antibacterial action against E. faecalis , followed by 2% chlorhexidine gluconate, 17% EDTA, and 5% NaOCl. However, the exact correlation of in vitro study results to clinical conditions is impossible due to the variables involved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-04-30
This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closedmore » by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.« less
Characterization of solidifiers used for oil spill remediation.
Sundaravadivelu, Devi; Suidan, Makram T; Venosa, Albert D; Rosales, Pablo I
2016-02-01
The physical characteristics and chemical composition of oil spill solidifiers were studied, and correlation of these properties with product effectiveness enabled determination of characteristics that are desirable in a good solidifier. The analyses revealed that the commercial products were primarily comprised of organic polymers and a few trace elements. A natural sorbent, which was composed entirely of plant based matter, was also evaluated, and it had the highest oil removal capacity, but it did not produce a solid mat-like final product. Generally, solidifiers with a carbonate group, pore size greater than 5 μm, and bulk densities lower than 0.3 g cm(-3) were found to have better efficiency and produced a cohesive rubbery final product that facilitated removal compared to sorbents. The importance of bulk density and pore size in the performance of the solidifier suggest that the primary mechanism of action was likely physical sorption. Copyright © 2015 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Full action of two deformation operators in the D1D5 CFT
NASA Astrophysics Data System (ADS)
Carson, Zaq; Hampton, Shaun; Mathur, Samir D.
2017-11-01
We are interested in thermalization in the D1D5 CFT, since this process is expected to be dual to black hole formation. We expect that the lowest order process where thermalization occurs will be at second order in the perturbation that moves us away from the orbifold point. The operator governing the deformation off of the orbifold point consists of a twist operator combined with a supercharge operator acting on this twist. In a previous paper we computed the action of two twist operators on an arbitrary state of the CFT. In the present work we compute the action of the supercharges on these twist operators, thereby obtaining the full action of two deformation operators on an arbitrary state of the CFT. We show that the full amplitude can be related to the amplitude with just the twists through an action of the supercharge operators on the initial and final states. The essential part of this computation consists of moving the contours from the twist operators to the initial and final states; to do this one must first map the amplitude to a covering space where the twists are removed, and then map back to the original space on which the CFT is defined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document amends the 1992 Record of Decision (ROD) for remedial action at the Cannelton Industries, Inc. site, in Sault Ste. Marie, Michigan. The final remedy addresses remediation of soil and sediment contamination by eliminating or reducing the principal threat posed by contaminated tannery waste, contaminated soil and sediment at the site, through containment and removal.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finger, F.J.; Todd, Q.R.
An Environmental Investigation and Alternatives Assessment was conducted for the Crime Records Center at Fort Holabird in Baltimore, Maryland. Groundwater sampling, underground storage tank tightness testing, radon sampling, asbestos sampling, soil observations, and a review of previously collected data were used to develop remedial alternatives and recommendations. Removal and record keeping were recommended for asbestos. The recommendation for groundwater was no action.
40 CFR 300.415 - Removal action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Removal action. 300.415 Section 300... PLAN Hazardous Substance Response § 300.415 Removal action. (a)(1) In determining the appropriate extent of action to be taken in response to a given release, the lead agency shall first review the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Enviro-chem site is a former waste recovery/reclamation/brokerage facility in Boone County, Indiana. Adjacent to the site is another Superfund site, the Northside Sanitary Landfill (NSL) which, prior to the Record of Decision (ROD) amendment, was to be remediated in a combined remedy for both sites. Land use in the area is agricultural and residential to the north and west. In May 1982, the State ordered Enviro-Chem to close and environmentally secure the site because it failed to reduce hazardous waste inventories. Subsequently, two emergency removal actions were conducted to remove the major sources of contamination. The ROD amends themore » 1987 ROD and provides a comprehensive site remedy for the Enviro-Chem site addressing source control instead of ground water remediation. The primary contaminants of concern affecting the soil are VOCs including PCE, TCE, toluene; and other organics including phenols. The amended remedial action for the site includes treating contaminated soil onsite using soil vapor extraction with a granulated activated carbon system to control the extracted vapor and implementing a contingent remedy for a subsurface ground water collection and treatment system.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...EPA proposes to approve State Implementation Plan (SIP) revisions submitted by the Maryland Department of the Environment (MDE). These revisions approve specific provisions of a 2011 Consent Decree between MDE and GenOn to reduce particulate matter (PM), sulfur oxides (SOX), and nitrogen oxides (NOX) from the GenOn Chalk Point generating station (Chalk Point). These revisions also remove the 1978 and 1979 Consent Orders for the Chalk Point generating station from the Maryland SIP as those Consent Orders have been superseded by the 2011 Consent Decree. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Non-Time-Critical Removal Actions
Removal responses are used to address contamination that poses an immediate threat to human health and the environment. The documents below are a partial list of EPA's guidance for removals, with a focus on Non-Time-Critical Removal Actions (NTCRA).
Characterization of Solidifiers used for Oil Spill Remediation ...
The physical characteristics and chemical composition of oil spill solidifiers were studied, and correlation of these properties with product effectiveness enabled determination of characteristics that are desirable in a good solidifier. The analyses revealed that the commercial products were primarily comprised of organic polymers and a few trace elements. A natural sorbent, which was composed entirely of plant based matter, was also evaluated, and it had the highest oil removal capacity, but it did not produce a solid mat-like final product. Generally, solidifiers with a carbonate group, pore size greater than 5 µm, and bulk densities lower than 0.3 g cm-3 were found to have better efficiency and produced a cohesive rubbery final product that facilitated removal compared to sorbents. The importance of bulk density and pore size in the performance of the solidifier suggest that the primary mechanism of action was likely physical sorption. In this study, we focused on characterizing the 12 solidifiers by using different analytical techniques.
METHOD FOR REMOVAL OF LIGHT ISOTOPE PRODUCT FROM LIQUID THERMAL DIFFUSION UNITS
Hoffman, J.D.; Ballou, J.K.
1957-11-19
A method and apparatus are described for removing the lighter isotope of a gaseous-liquid product from a number of diffusion columns of a liquid thermal diffusion system in two stages by the use of freeze valves. The subject liquid flows from the diffusion columns into a heated sloping capsule where the liquid is vaporized by the action of steam in a heated jacket surrounding the capsule. When the capsule is filled the gas flows into a collector. Flow between the various stages is controlled by freeze valves which are opened and closed by the passage of gas and cool water respectively through coils surrounding portions of the pipes through which the process liquid is passed. The use of the dual stage remover-collector and the freeze valves is an improvement on the thermal diffusion separation process whereby the fraction containing the lighter isotope many be removed from the tops of the diffusion columns without intercolumn flow, or prior stage flow while the contents of the capsule is removed to the final receiver.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-28
This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within themore » watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.« less
Effect and removal mechanisms of 6 different washing agents for building wastes containing chromium.
Xing-run, Wang; Yan-xia, Zhang; Qi, Wang; Jian-min, Shu
2012-01-01
With the building wastes contaminated by chromium in Haibei Chemical Plan in China as objects, we studied the contents of total Cr and Cr (VI) of different sizes, analyzed the effect of 6 different washing agents, discussed the removal mechanisms of 6 different washing agents for Cr in various forms, and finally selected applicable washing agent. As per the results, particle size had little impact on the contents of total Cr and Cr (VI); after one washing with water, the removal rate of total Cr and Cr (VI) was 75% and 78%, respectively, and after the second washing with 6 agents, the removal rate of citric acid was the highest, above 90% for total Cr and above 99% for hexavalent chromium; the pH of building wastes were reduced by citric acid, and under acid condition, hexavalent chromium was reduced to trivalent chromium spontaneously by organic acid, which led to better removal rate of acid soluble Cr and reducible Cr; due to the complexing action, citric acid had best removal rate for oxidizable trivalent chromium. In conclusion, citric acid is the most applicable second washing agent for building wastes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the URmore » Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
...EPA is taking final action to disapprove submittals from the State of Texas, through the Texas Commission on Environmental Quality (TCEQ), to revise the Texas Major and Minor NSR SIP. We are disapproving the submittals because they do not meet the 2002 revised Major NSR SIP requirements. We are also disapproving the submittals as not meeting the Major Nonattainment NSR SIP requirements for implementation of the 1997 8-hour ozone national ambient air quality standard (NAAQS) and the 1-hour ozone NAAQS. EPA is disapproving the submitted Standard Permit (SP) for Pollution Control Projects (PCP) because it does not meet the requirements of the CAA for a minor NSR Standard Permit program. Finally, EPA is also disapproving a submitted severable definition of best available control technology (BACT) that is used by TCEQ in its Minor NSR SIP permitting program. EPA is not addressing the submitted revisions concerning the Texas Major PSD NSR SIP, which will be addressed in a separate action. EPA is taking no action on severable provisions that implement section 112(g) of the Act and is restoring a clarification to an earlier action that removed an explanation that a particular provision is not in the SIP because it implements section 112(g) of the Act. EPA is not addressing severable revisions to definitions submitted June 10, 2005, submittal, which will be addressed in a separate action. We are taking no action on a severable provision relating to Emergency and Temporary Orders, which we will address in a separate action. EPA is taking these actions under section 110, part C, and part D, of the Federal Clean Air Act (the Act or CAA).
2010-07-01
the ground source heat pump system . During installation, construction equipment would remove vegetation from the surface and disturb soil to a depth...levels of 50 to 55 dBA or higher on a daily basis. Studies specifically conducted to determine noise effects on various human activities show that about...needs to be evaluated for its potential effects on a project site and adjacent land uses. The foremost factor affecting a proposed action in terms of
1974-01-02
Disjointed..,little continuity - Omission of the "why" of training, which leaves it up to the individual student to determine the importance of the...the student when a response was required. A "roll- up " function caused old information on the screen to be completely or partially removed, depending on...each game inter- action, the student is asked questions which build up to a generalized statement of the rounding rules. Finally, the criterion items
Irradiation in the production, processing and handling of food. Final rule.
2012-11-30
The Food and Drug Administration (FDA) is amending the food additive regulations to increase the maximum dose of ionizing radiation permitted in the treatment of poultry products, to include specific language intended to clarify the poultry products covered by the regulations, and to remove the limitation that any packaging used during irradiation of poultry shall not exclude oxygen. This action is in response to a petition filed by the U.S. Department of Agriculture, Food Safety and Inspection Service (USDA/FSIS).
Copete-Pertuz, Ledys S; Plácido, Jersson; Serna-Galvis, Efraím A; Torres-Palma, Ricardo A; Mora, Amanda
2018-07-15
In this work, Leptosphaerulina sp. (a Colombian native fungus) significantly removed three Isoxazolyl-Penicillin antibiotics (IP): oxacillin (OXA, 16000 μg L -1 ), cloxacillin (CLX, 17500 μg L -1 ) and dicloxacillin (DCX, 19000 μg L -1 ) from water. The biological treatment was performed at pH 5.6, 28 °C, and 160 rpm for 15 days. The biotransformation process and lack of toxicity of the final solutions (antibacterial activity (AA) and cytotoxicity) were tested. The role of enzymes in IP removal was analysed through in vitro studies with enzymatic extracts (crude and pre-purified) from Leptosphaerulina sp., commercial enzymes and enzymatic inhibitors. Furthermore, the applicability of mycoremediation process to a complex matrix (simulated hospital wastewater) was evaluated. IP were considerably abated by the fungus, OXA was the fastest degraded (day 6), followed by CLX (day 7) and DCX (day 8). Antibiotics biodegradation was associated to laccase and versatile peroxidase action. Assays using commercial enzymes (i.e. laccase from Trametes versicolor and horseradish peroxidase) and inhibitors (EDTA, NaCl, sodium acetate, manganese (II) ions) confirmed the significant role of enzymatic transformation. Whereas, biomass sorption was not an important process in the antibiotics elimination. Evaluation of AA against Staphylococcus aureus ATCC 6538 revealed that Leptosphaerulina sp. also eliminated the AA. In addition, the cytotoxicity assay (MTT) on the HepG2 cell line demonstrated that the IP final solutions were non-toxic. Finally, Leptosphaerulina sp. eliminated OXA and its AA from synthetic hospital wastewater at 6 days. All these results evidenced the potential of Leptosphaerulina sp. mycoremediation as a novel environmentally friendly process for the removal of IP from aqueous systems. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less
Superfund Removal Guidance for Preparing Action Memoranda
Dated September 2009, this updates and replaces previous documents. An Action Memo (AM) should substantiate need for removal action based upon criteria in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). Includes AM template.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-06-28
The 17.5-acre Nascolite site is an inactive acrylic and plexiglass sheet manufacturing plant in Millville, Cumberland County, New Jersey. The site lies within the New Jersey coastal plain and overlies clay, silt, sand, and gravel layers. The majority of the site is wooded, with a wetland located in the southwestern portion. In 1980, although the State ordered the plant to stop discharging wastewaters into the onsite drainage ditch, well water monitoring conducted during 1981 identified VOC-contamination in these wells. In 1984, the State identified over one hundred 55-gallon drums and several underground storage tanks buried onsite. In 1987, the Statemore » ordered Nascolite to remove some of the drums, and later during 1987 and 1988, EPA removed the remaining drums offsite. The ROD addresses contaminated onsite soil, sediment, and buildings. The primary contaminant of concern affecting the soil, sediment, and debris is the inorganic contaminant lead; and VOCs including benzene, PCE, TCE, toluene, and xylenes. The selected remedial action for the site is included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-04
The 13.19-acre Rhone-Poulenc/Zoecon site is located in East Palo Alto, San Mateo County, California. The site is composed of at least 12 separately owned parcels that include a 5.19-acre former pesticide manufacturing plant, a sludge pond, and a chemical storage facility owned by Sandoz Crop Protection Corporation. In 1980, an investigation by the new site owners revealed severe contamination of soil and ground water with arsenic, which resulted from improper handling of pesticides during unloading. The ROD addresses the contaminated soil and ground water in the upland operable unit. The primary contaminants of concern affecting the soil and ground watermore » include arsenic, mercury, selenium, lead and cadmium. The selected remedial action for the site at the Sandoz and Bains properties includes removing and disposing of offsite soil from accessible areas with arsenic levels greater than 5,000 mg/kg and installing a cap; and removing or paving over soil.« less
Changes induced by sea level rise on network properties of restoration areas
NASA Astrophysics Data System (ADS)
Jiménez, Mirian; Castanedo, Sonia; Zhou, Zeng; Coco, Giovanni; Medina, Raúl
2015-04-01
Human actions have been reducing the natural domain of estuarine systems for centuries. In the past, estuaries were perceived as unhealthy areas, source of diseases, which were adapted to human use by drainage and heavy engineering. Our current understanding shows that estuaries are not sources of disease, but rich ecosystems that cover important ecosystem functions. They need to be restored to their natural state. However, restoration actions may induce morphological changes that may change the estuary current behavior. It is thus of the utmost importance to understand the morphodynamic changes induced by restoration actions, more so when the final aim is to predict these changes. Dikes have been the most used mean to enclose and drain areas of estuaries. In this work, we focus our attention on dike removal as a means to restore the areas enclosed by these dikes. Dikes may be removed completely, or only partially (opening one or several breaches), to allow the tidal flow to enter into the area to be restored. Morphodynamic effects of dike removal are simulated numerically using Delft3d. Different dike removal configurations are studied and their effect on the recovery of the estuary quantified. Estuarine tidal networks are characterized by means of a new approach that links network connectivity to the spatial hydrodynamic fields developed in the estuary. The impact of different restorations strategies in the drainage properties of the network has been studied in the short term (5 -10 years) and in the long term (100 years) allowing the connectivity to evolve with time. Results show, for different scenarios, differences not only in the spatial distribution of the tidal network but also in statistical characteristics after different dike removal actions. The new distribution of channels will have implications for the location of the tidal flats, flood patterns and thus biological environments within the tidal networks. These changes in the morphological properties are quantified with the new approach (Jiménez et al.,2014), which allows to highlight the changes that induce deep behavioral changes in the system. The importance of sea level rise in these behavioral changes is also assessed in the study. References: Jiménez, M., S. Castanedo, Z. Zhou, G.Coco, R. Medina, and I. Rodriguez-Iturbe (2014). Scaling properties of tidal networks, Water Resources Research., 50, doi:10.1002/2013WR015006.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-24
This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. Themore » project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section constitute...
Neutron Spectrometry for Identification of filler material in UXO - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bliss, Mary
2007-09-12
Unexploded ordnance (UXO)-contaminated sites often include ordnance filled with inert substances that were used in dummy rounds. During UXO surveys, it is difficult to determine whether ordnance is filled with explosives or inert material (e.g., concrete, plaster-of-paris, wax, etc.) or is empty. Without verification of the filler material, handling procedures often necessitate that the object be blown in place, which has potential impacts to the environment, personnel, communities and survey costs. The Department of Defense (DoD) needs a reliable, timely, non-intrusive and cost-effective way to identify filler material before a removal action. A new technology that serves this purpose wouldmore » minimize environmental impacts, personnel safety risks and removal costs; and, thus, would be especially beneficial to remediation activities.« less
Memo: Request for Approval of a Time-Critical Removal Action and $2 Million
The purpose of this Action Memorandum is to request and document approval of a time-critical removal action described herein for the Mississippi Phosphates Corporation Site (Site) located at 601 Industrial Road, Pascagoula, Jackson County, Mississippi.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2010-04-01
Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Recordmore » of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls of the leach pit chamber and leach rock. The contamination present at CAS 06-05-03 within the leach pit was not feasible to remove. •The surface and subsurface soils within and surrounding the septic system at CAS 06-05-04 contained PCB concentrations above the FAL of 0.74 mg/kg. The lateral and vertical extent of COCs was determined for this CAS. Contaminated soils were removed up to within 18 ft of the building. The remaining contamination is confined to subsurface soils adjacent to and beneath Building CP-162 and was not feasible to remove. •The solid materials within the septic tank and soils immediately surrounding the inlet end of the tank at CAS 06-59-03 contained benzo(a)pyrene above the FAL of 0.21 mg/kg. The soils, tank contents, and tank were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. •The solids contained within the septic tank and inlet pipe at CAS 06-59-05 contained the following contaminants above their respective FALs: PCBs, arsenic, lead, benzo(a)pyrene, and pesticides. The tank and inlet pipe contents were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following corrective action recommendations: •No further action for CASs 03-51-01, 06-04-02, and 06-59-04, as no contaminants of potential concern were present that exceed FALs. •Closure in place for CAS 06-05-03 under a corrective action with a use restriction (UR) for remaining PCB- and arsenic-impacted potential source material (PSM). The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •Closure in place for CAS 06-05-04 under a corrective action with a UR for remaining PCBs in soil adjacent to and beneath Building CP-162. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •No further action for CAS 06-59-03, as the COC of benzo(a)pyrene in soil and PSM have been removed. •No further action for CAS 06-59-05, as the COCs in PSM within the septic tank and inlet piping have been removed and the tank was filled with concrete.« less
2013-12-27
In this final rule, the Office of Inspector General (OIG) amends the safe harbor regulation concerning electronic health records items and services, which defines certain conduct that is protected from liability under the Federal anti-kickback statute, section 1128B(b) of the Social Security Act (the Act). Amendments include updating the provision under which electronic health records software is deemed interoperable; removing the electronic prescribing capability requirement; extending the sunset provision until December 31, 2021; limiting the scope of protected donors to exclude laboratory companies; and clarifying the condition that prohibits a donor from taking any action to limit or restrict the use, compatibility, or interoperability of the donated items or services.
Nuclear reactor with makeup water assist from residual heat removal system
Corletti, Michael M.; Schulz, Terry L.
1993-01-01
A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path.
Nuclear reactor with makeup water assist from residual heat removal system
Corletti, M.M.; Schulz, T.L.
1993-12-07
A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path. 2 figures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. The materials within Operable Unit 4 exhibit a wide range of properties. Most notable would be the elevated direct radiation associated with the K-65 residues versus the much lower direct radiation associated with cold metal oxides in Silo 3. Even more significant would be the much lower levels of contamination associated with the soils and building materials, like concrete, within the Operable Unit 4 Study Area. On the basis of the evaluation of final alternatives, the selected remedy addressing Operable Unitmore » 4 at the FEMP is a combination of Alternatives 3A.1/Vit - Removal, Vitrification, and Off-site Disposal - Nevada Test Site (NTS); 3B.1/Vit - Removal, Vitrification, and Off-site Disposal - NTS; and 2C - Demolition, Removal and On-Property Disposal.« less
40 CFR 300.415 - Removal action.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., provision for post-removal site control following a CERCLA Fund-financed removal action at both NPL and non... lead agency shall conduct an engineering evaluation/cost analysis (EE/CA) or its equivalent. The EE/CA...) Fences, warning signs, or other security or site control precautions—where humans or animals have access...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for the period October 2006-September 2007. Quarterly inspections were conducted on December 20,2006; March 29,2007; June 13,2007; and September 27, 2007, to observe the condition of the gate, use restriction warning signs, monuments, fencing, trenches, soil covers, and monitoring well covers. The first inspection was conducted on December 20,2006. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. Themore » second inspection was conducted on March 29,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. Vegetation that was observed to be growing in several locations on the cover was the only identified concern, for which removal was recommended. Vegetation was removed on May 24,2007. The third inspection was conducted on June 13,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The fourth inspection was conducted on September 27,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The post-closure inspection checklists for CAU 112 are attached. Photographs and field notes taken during site inspections are maintained in the project files.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less
THE NATURE OF SERUM ANTITRYPSIN
Jobling, James W.; Petersen, William
1914-01-01
1. The ferment-inhibiting action of the serum is due to the presence of compounds of the unsaturated fatty acids. 2. These fatty acid compounds may be removed from the serum by means of chloroform or ether. 3. Soaps prepared by saponifying the chloroform or ether extracts inhibit the action of trypsin. 4. The anti-enzyme action of the serum can be removed by filtering acid serum through kaolin, and can in part be restored by extracting the kaolin. 5. The decrease in strength of anti-enzyme in old sera is probably due to the action of the serum lipase. 6. Iodin, potassium iodide, or hydrogen peroxide remove the inhibiting action of the serum. 7. Soaps of the unsaturated fatty acids lose their ferment-inhibiting action when heated with serum at 70° C. PMID:19867786
Cameron Station remedial investigation: Final asbestos survey report. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Woodward-Clyde Federal Services (WCFS) conducted a comprehensive asbestos survey of the facilities at Cameron Station as part of its contract with the US Army Toxic and Hazardous Materials Agency (USATHAMA) to perform a remedial investigation and feasibility study (RI/FS) at the base. The purpose of the survey which was initiated August 23, 1990 in response to the Base Realignment And Closure Environmental Restoration Strategy (BRAC), was to identify friable and non-friable asbestos-containing material (ACM), provide options for abatement of asbestos, provide cost estimates for both abatement and operations and maintenance costs, and identifying actions requiring immediate action in Cameron Station`smore » 24 buildings. BRAC states that only friable asbestos which presents a threat to health and safety shall be removed; non-friable asbestos or friable asbestos which is encapsulated or in good repair shall be left in place and identified to the buyer per GSA agreement. The investigation followed protocols that met or exceeded the requirements of 40 CFR 763, the EPA regulations promulgated under the Asbestos Hazard Emergency Response Act (AHERA).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-09-28
The five-acre Stamina Mills site is a former textile weaving and finishing facility in North Smithfield, Providence County, Rhode Island. A portion of the site is within the 100-year floodplain and wetland area of the Branch River. The manufacturing process used cleaning solvents, acids, bases and dyes for coloring, pesticides for moth proofing, and plasticizers to coat fabrics. Mill process wastes were placed in a landfill onsite. EPA initiated three removal actions from 1984 to 1990, including an extension of the municipal water supply to residents obtaining water from the affected aquifer; and treatment of two underground and one above-groundmore » storage tanks, followed by offsite disposal. The Record of Decision (ROD) provides a final remedy and addresses both source control and management of contaminated ground water migration at the site. The primary contaminants of concern affecting the soil, debris, sediment, and ground water are VOCs including TCE and PCE; other organics including pesticides; and metals including chromium.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
5 CFR 9701.707 - Appeals of mandatory removal actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) General. Appeals of mandatory removal actions are governed by procedures set forth in this section. An... appellant has the right to be represented by an attorney or other representative. (4) The only action... otherwise provided by law, the MRP may require payment by the Department of reasonable attorney fees...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, thismore » addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 04-26-03, Lead Bricks. This UR was established as part of FFACO corrective actions and was based on the presence of lead contamination at concentrations greater than the action level established at the time of the initial investigation.« less
Guo, Shaolong; Zhang, Feihu; Zhang, Yong; Luan, Dianrong
2014-01-01
Through the polishing experiments of potassium dihydrogen phosphate (KDP) crystals based on deliquescent action, the effect of several major factors, including crystal's initial surface state, polishing time, and revolution of polishing plate, on material removal was researched. Under certain experimental conditions, the rules of material removal were reached, and experimental results are discussed, which lays the foundation for popularization and application of polishing technology for KDP crystals based on deliquescent action.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
40 CFR 300.820 - Administrative record file for a removal action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.820 Administrative record file for a removal action. (a) If, based on the site evaluation, the lead agency determines... public comment. At such time, the lead agency shall publish in a major local newspaper of general...
Stage II Remedial Action Plan Deer Lake AOC
Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.
Morphology of bone particles after harvesting with 4 different devices.
Papadimitriou, Dimitrios E V; Schmidt, Erich C; Caton, Jack G; Romanos, Georgios E
2013-04-01
Autogenous bone is routinely used for regeneration of osseous defects around teeth and implants, and different instruments are available for bone harvesting. The purpose of this study was to describe the morphology of bone particles after harvesting with 4 different instruments. Bone particles were harvested from fresh cow ribs with 2 different types of back action chisels, a safescraper and a sonic device. The samples were examined morphologically using light microscopy and scanning electron microscopy. The bone particles after the back action chisel I had an appearance similar to "pencil shavings." With the back action chisel II, they were like thin paper with an "accordion bellows" appearance. After removal with the safescraper, they had an irregular shape (with an irregular surface) resembling "crushed stone." Finally, the appearance of the bone particles obtained with the sonic device was homogenous, condensed and continuous, and had a "seaweed" appearance. Harvesting of bone particles with 4 different devices produce distinctly difference sizes and shapes, which may influence the results of grafting procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with themore » UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
Liyun, Yang; Ping, Xu; Maomao, Yang; Hao, Bai
2017-02-01
This study examined the characteristics of nitrate removal from aqueous solution by steel slag and the feasibility of using steel slag as a soil additive to remove nitrate. Steel slag adsorbents were characterized by X-ray fluorescence (XRF), X-ray diffraction (XRD), scanning electron microscopy (SEM) and infrared spectrum (IR spectrum). Adsorption isotherms and kinetics were also analysed. Various parameters were measured in a series of batch experiments, including the sorbent dose, grain size of steel slag, reaction time, initial concentration of nitrate nitrogen, relationship between Al, Fe and Si ions leached from the steel slag and residual nitrate in the aqueous solution. The nitrate adsorbing capacity increased with increasing amounts of steel slag. In addition, decreasing the grain diameter of steel slag also enhanced the adsorption efficiency. Nitrate removal from the aqueous solution was primarily related to Al, Fe, Si and Mn leached from the steel slag. The experimental data conformed to second-order kinetics and the Freundlich isothermal adsorption equation, indicating that the adsorption of nitrate by steel slag is chemisorption under the action of monolayer adsorption. Finally, it was determined that using steel slag as a soil additive to remove nitrate is a feasible strategy.
Yi, Yuan-Rong; Han, Min-Fang
2012-07-01
The carbon dioxide (CO2) in flue gas was used to remove the sodium in the red mud (RM) , a kind of alkaline solid waste generated during alumina production. The reaction characteristics and mechanism of sodium removal by the synergistic action of CO2 and RM were studied with different medium pH, reaction time and temperature. It was demonstrated that the remove of sodium by RM was actually the result of the synergistic action of sodium-based solid waste in RM with the CO2-H2O and OH(-)-CO2 systems. The sodium removal efficiency was correlated with pH, reaction temperature and time. The characteristics of RM before and after sodium removal were analyzed using X-ray diffractometer (XRD) and scanning electron microscope (SEM), and the results showed that the alkaline materials in the red mud reacted with CO2 and the sodium content in solid phases decreased significantly after reaction. The sodium removal efficiency could reach up to 70% with scientific procedure. The results of this research will offer an efficient way for low-cost sodium removal.
Notification: Evaluation of Time-Critical Removal Actions for Superfund Sites
Project #OPE-FY15-0019, February 4, 2015. The EPA OIG plans to begin preliminary research on the evaluation of the effectiveness of time-critical removal actions for Superfund sites on February 24, 2015.
Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 1-acre Central Illinois Public Service (CIPS) site is a former manufactured gas plant in Taylorville, Christian County, Illinois. The plant produced a low-quality gas from coal, which was used for lighting and heating. Onsite contamination by coal tar was discovered in 1985 during site construction. The ROD addressesses a final remedy for the remaining principal threat posed by ground water contamination at the site, and also documents the prior 1987 removal action. The primary contaminants of concern affecting the soil, sediment, debris, and ground water at the site are VOCs, including benzene, toluene, and xylenes; and other organics, includingmore » PAHs and phenols.« less
Biofilm thickness measurement using an ultrasound method in a liquid phase.
Maurício, R; Dias, C J; Jubilado, N; Santana, F
2013-10-01
In this report, the development of an online, noninvasive, measurement method of the biofilm thickness in a liquid phase is presented. The method is based in the analysis of the ultrasound wave pulse-echo behavior in a liquid phase reproducing the real reactor conditions. It does not imply the removal of the biomass from the support or any kind of intervention in the support (pipes) to detect and perform the measurements (non-invasiveness). The developed method allows for its sensor to be easily and quickly mounted and unmounted in any location along a pipe or reactor wall. Finally, this method is an important innovation because it allows the thickness measurement of a biofilm, in liquid phase conditions that can be used in monitoring programs, to help in scheduling cleaning actions to remove the unwanted biofilm, in several application areas, namely in potable water supply pipes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Report: EPA Needs to Improve Internal Controls to Increase Cost Recovery
Report #09-P-0144, April 27, 2009. Within a sample of removal actions we reviewed, EPA collected from responsible parties approximately 11 percent ($31.4 of $294.5 million) of the Federal Government’s costs for conducting the removal actions.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...EPA is taking direct final action to approve State Implementation Plan (SIP) revisions submitted by the Maryland Department of the Environment (MDE) pertaining to the GenOn Chalk Point Generating Station (Chalk Point). These revisions approve specific provisions of a 2011 Consent Decree between MDE and GenOn to reduce particulate matter (PM), sulfur oxides (SOX), and nitrogen oxides (NOX) from Chalk Point. These revisions also remove the 1978 and 1979 Consent Orders for the Chalk Point generating station from the Maryland SIP as those Consent Orders have been superseded by the 2011 Consent Decree. EPA is approving these SIP revisions because the reductions of PM, SOX, and NOX are beneficial for reducing ambient levels of the PM, sulfur dioxide (SO2), nitrogen dioxide (NO2) and ozone. They also reduce visible emissions from Chalk Point. This action is being taken under the Clean Air Act (CAA).
33 CFR 133.13 - Removal actions eligible for funding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Removal actions eligible for funding. 133.13 Section 133.13 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST...
33 CFR 133.13 - Removal actions eligible for funding.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Removal actions eligible for funding. 133.13 Section 133.13 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST...
33 CFR 133.13 - Removal actions eligible for funding.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Removal actions eligible for funding. 133.13 Section 133.13 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST...
33 CFR 133.17 - Conduct of removal actions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Conduct of removal actions. 133.17 Section 133.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND; STATE...
33 CFR 133.13 - Removal actions eligible for funding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Removal actions eligible for funding. 133.13 Section 133.13 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST...
33 CFR 133.17 - Conduct of removal actions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Conduct of removal actions. 133.17 Section 133.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND; STATE...
33 CFR 133.13 - Removal actions eligible for funding.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Removal actions eligible for funding. 133.13 Section 133.13 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST...
33 CFR 133.17 - Conduct of removal actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Conduct of removal actions. 133.17 Section 133.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND; STATE...
33 CFR 133.17 - Conduct of removal actions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Conduct of removal actions. 133.17 Section 133.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND; STATE...
33 CFR 133.17 - Conduct of removal actions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Conduct of removal actions. 133.17 Section 133.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND; STATE...
Action Memorandum for Decommissioning of TAN-607 Hot Shop Area
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. A. Pinzel
The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Area using a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA). The scope of the removal action is limited to TAN-607 Hot Shop Area. An engineering evaluation/cost analysis (EE/CA) has assisted the Department of Energy Idaho Operations Office in identifuomg the most effective method for performing the decommissioning of this structure whose mission has ended. TAN-607 Hot Shop Area is located at Test Area North Technical Support Facility within the Idaho National Laboratory Site. The selected alternative consists of demolishing themore » TAN-607 aboveground structures and components, removing belowground noninert components (e.g. wood products), and removing the radiologically contaminated debris that does not meet remedial action objectives (RAOs), as defined in the Record of Decision Amendment for the V-Tanks and Explanation of Significant Differences for the PM-2A Tanks at Test Area North, Operable Unit 1-10.« less
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-09-29
The Allied Chemical site is located in the City of Ironton, Lawrence County, Ohio. The remedial action addresses the Goldcamp Disposal Area (GDA) operable unit of the site. The GDA was a sand and gravel pit used for disposal of various chemical wastes from three sources between 1945 and 1977. In 1977, Allied decided to discontinue use of the GDA for disposal of chemical wastes. Allied and its contractor, in consultation with the Ohio Environmental Protection Agency (OEPA), completed a closure project at the site in August 1980, which involved removal of standing liquids and filling and capping the sitemore » with clay. Subsequent hydrogeologic and water-quality investigations indicated that there is ground-water contamination at the site which may pose a threat to public health through migration. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, other organics including phenols and PAHs, and inorganics including cyanide. The selected remedial action for the site is included.« less
Environmental Assessment: Clear Zone and Accident Potential Zone Selective Tree Removal
2011-05-25
PROPOSED ACTION The Proposed Action would occur within the CZ and APZs north and south of the runway. The overall area is undeveloped wetland and...existing runway. Therefore, there is no practicable alternative to conducting the action in floodplain/ wetland areas. Three technical alternatives for...or removal would be required. Alternative 3 was eliminated because leaving woody debris in wetlands would not meet U.S. Army Corps of Engineers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barber, Brenda; Honerlah, Hans; O'Neill, Mike
2012-07-01
Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineersmore » (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-09-28
The Shenandoah Stables (SS) site is located in a rural area near Moscow Mills, Lincoln County, Missouri, within the upper floodplain of Crooked Creek. The property includes an enclosed arena and horse stables building, a number of single family residences, a livestock operation, and other small businesses on approximately 5- to 10-acre land parcels around the facility. In 1971, the area inside the arena was sprayed with approximately 1,500 gallons of dioxin-contaminated waste oil for dust control purposes. Subsequently, a number of adverse effects were noted in horses, other animals, and in humans. The ROD addresses the final remedy formore » the site, the removal of 3,471 cubic yards of contaminated materials currently stored onsite in 2,660 separate containers. The primary contaminant of concern affecting the soil and debris is dioxin.« less
Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walton, L.
1995-01-01
The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and tomore » plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project.« less
Peters, O A; Morgental, R D; Schulze, K A; Paqué, F; Kopper, P M P; Vier-Pelisser, F V
2014-06-01
To develop a method to evaluate the cutting behaviour of nickel-titanium (NiTi) coronal flaring instruments. BioRaCe BR0 (BR), HyFlex CM 1 (HY), ProFile OS No. 2 (PF) and ProTaper Sx (PT) instruments were used in simulated coronal flaring using a lateral action against bovine dentine blocks, at 250 and 500 rpm. Cutting efficiency was assessed by three methods: first, areas of notches produced by instruments were directly measured under a stereomicroscope. Second, dentine specimens were then analysed by surface profilometry to determine the maximum cutting depth and finally by microcomputed tomography to assess the volume of removed dentine. Data were compared using parametric tests with the significance level set at 0.05. For all three methods, HY and PF were the most and the least cutting-efficient instruments, respectively (P < 0.05). Significant differences were detected between 250 and 500 rpm for HY and PT (area); for BR, HY and PT (depth); and for BR and HY (volume). There were strong positive correlations between the results obtained with those three different methods with r-values ranging from 0.81 to 0.92. Measuring the amount of material removed in a specific time under stereomicroscopy is a simple and rational way to assess the cutting behaviour of NiTi rotary instruments in lateral action. HyFlex, manufactured with thermomechanically treated NiTi wire, was the most efficient instrument, and increased rotational speed was associated with increased cutting efficiency. © 2013 International Endodontic Journal. Published by John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-08-01
Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less
76 FR 9853 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
31 CFR 800.601 - Finality of actions under section 721.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under section...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... action alternatives vary by the number and location of study areas, the type of experimental design... nonlethal), and the type of experimental design (demography vs. occupancy). All action alternatives are...-FF01E00000] Experimental Removal of Barred Owls To Benefit Threatened Northern Spotted Owls; Record of...
[4th World Conference on Women].
1995-06-01
The World Platform of Action is a document prepared by the secretary of the UN Commission on the Status of Women (CSW) that acknowledges commitments made by the subscribing governments. In the final preparatory meeting for the Fourth International Conference on Women in Beijing, official delegations of the world's governments discussed the draft of the Platform of Action. Throughout the Platform, there is evidence of a retreat from concepts internationally recognized at other conferences. The Vatican, in alliance with countries like Honduras, Argentina, and Guatemala, and with fundamentalist religious groups, is largely responsible for the obstruction. The draft indicates which topics have failed to gain consensus and require discussion at the full Conference. The Platform is defined as an agenda for seeking empowerment of women, an objective necessitating removal of obstacles to active participation by women in all spheres of public life. The Platform defines the critical areas for action as the persistent increase in poverty among women, unequal access to education and training, unequal access to health care, violence against women and girls, effects of persecution and armed conflicts, unequal access to productive processes, and unequal power and influence in decision making at all levels. Insufficient mechanisms for promoting women, protection of the human rights of women, women and communication, and women and the environment are other priority topics. Problems are discussed in each of these areas, and objectives and concrete actions are proposed. The work describes the types of institutional changes that will be needed if the objectives are to be achieved; defines sex, gender, and other relevant terms; and analyses some of the strategic objectives in greater detail. The final section contains recommendations for women's groups and other lobbyists in Colombia to present to the government.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
40 CFR 35.6205 - Removal Cooperative Agreements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Removal Cooperative Agreements. 35.6205... ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Removal Response Cooperative Agreements § 35.6205 Removal Cooperative Agreements. (a) The...
17 CFR 1.67 - Notification of final disciplinary action involving financial harm to a customer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... disciplinary action involving financial harm to a customer. 1.67 Section 1.67 Commodity and Securities... Miscellaneous § 1.67 Notification of final disciplinary action involving financial harm to a customer. (a) Definitions. For purposes of this section: (1) Final disciplinary action means any decision by or settlement...
77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Fore River Bridge..., 2012, the FHWA published ``Notice of Final Federal Agency Actions on Proposed Bridge in Massachusetts...
NASA Technical Reports Server (NTRS)
HolmesParker, Chris; Taylor, Mathew E.; Tumer, Kagan; Agogino, Adrian
2014-01-01
Learning in multiagent systems can be slow because agents must learn both how to behave in a complex environment and how to account for the actions of other agents. The inability of an agent to distinguish between the true environmental dynamics and those caused by the stochastic exploratory actions of other agents creates noise in each agent's reward signal. This learning noise can have unforeseen and often undesirable effects on the resultant system performance. We define such noise as exploratory action noise, demonstrate the critical impact it can have on the learning process in multiagent settings, and introduce a reward structure to effectively remove such noise from each agent's reward signal. In particular, we introduce Coordinated Learning without Exploratory Action Noise (CLEAN) rewards and empirically demonstrate their benefits
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9179-3 ] Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the final agency action on one TMDL established by...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Final action. 92.17 Section 92.17... Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making a... Notice of Assessment (or on demand under paragraph (c)(3)(ii)(D) of this section), a civil action to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
...: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to correct an... ozone. EPA is also taking final action to revise the boundaries of certain Southern California air...-2012-0936 for this action. The index to the docket is available electronically at www.regulations.gov...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less
Faille, C; Bénézech, T; Blel, W; Ronse, A; Ronse, G; Clarisse, M; Slomianny, C
2013-04-01
This study was designed to evaluate the respective roles of mechanical and chemical effects on the removal of Bacillus spores during cleaning-in-place. This analysis was performed on 12 strains belonging to the Bacillus cereus group (B. cereus, Bacillus anthracis, Bacillus thuringiensis) or to less related Bacillus species (Bacillus pumilus, Bacillus licheniformis, Bacillus sporothermodurans, Bacillus subtilis). Adherent spores were subjected to rinsing-in-place (mechanical action) and cleaning-in-place (mechanical and chemical actions) procedures, the latter involving NaOH 0.5% at 60°C. Results revealed that mechanical action alone only removed between 53 and 89% of the attached spores at a shear stress of 500 Pa. This resistance to shear was not related to spore surface properties. Conversely, in the presence of NaOH at a shear stress of 4 Pa, spores were readily detached, with between 80 and 99% of the adherent spores detached during CIP and the chemical action greatly depended on the strain. This finding suggests that chemical action plays the major role during CIP, whose efficacy is significantly governed by the spore surface chemistry. Copyright © 2012 Elsevier Ltd. All rights reserved.
Escher, Beate I; Bramaz, Nadine; Ort, Christoph
2009-10-01
Tertiary treatment of wastewater with ozone is a promising technique for removing residual micropollutants that remain after secondary biological treatment. We monitored the performance of a full-scale ozonation reactor on a sewage treatment plant in Switzerland with a screening battery of bioassays. Six toxicity endpoints were selected that covered non-specific toxicity, as well as selected receptor-mediated modes of action and reactive toxicity. Non-specific toxicity was assessed with two bioassays, the bioluminescence inhibition of the marine luminescent bacterium Vibrio Fischeri and the growth inhibition of the green algae Pseudokirchneriella subcapitata. Treatment efficiency was around 90% for the secondary treatment, but only 65% and 76% for the ozonation step in the two non-specific endpoints, respectively. This finding is consistent with this type of oxidation reaction because ozone only modifies the organic molecules but does not mineralize them fully leaving residual toxicity of the transformation products. In contrast, the specific receptor-mediated endpoints of inhibition of photosystem II in algae and estrogenicity were largely reduced by ozonation. While compounds inhibiting photosynthesis proved to be rather recalcitrant toward biological treatment with only 47% removal, an additional 86% removal by ozonation yielded an overall treatment efficiency in the entire treatment chain of 89%. The effect on estrogenicity, quantified with the yeast estrogen screen, was even more significant: A treatment efficiency of 95% in the secondary treatment, 86% during ozonation plus a small effect by biological sand filtration yielded an overall treatment efficiency of 99.5%. Insecticides that inhibit acetylcholinesterase were fairly resistant to degradation, but an overall treatment efficiency of 91% was achieved in two steps: 72% in biological treatment and 60% during ozonation. Finally, no significant genotoxicity was observed with the umuC test after ozonation, while the influent showed a genotoxic response when it was enriched by a factor of 15 to 60. Treatment efficiency increased with the ozone dose and remained virtually unchanged over ozone doses above 500 g ozone per kg dissolved organic carbon. The reduction of toxicity can be rationalized by the chemical oxidation processes likely to occur for each group of chemicals that are typical for a given mode of toxic action. For comparison, tertiary treatment with powdered activated carbon was also evaluated, which poses a viable alternative to ozonation with respect to removal of micropollutants.
American Lead Action Memorandum
ACTION MEMORANDUM— Request for a Time-Critical Removal Action andExemption from the $2 Million and 12-Month Statutory Limits at the AmericanLead Site, Indianapolis, Marion County, Indiana (Site ID #B56J)
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
Appeals court says FBI erred in terminating doctor's services. Federal Bureau of Investigations.
1995-09-22
The late Dr. [name removed] of San Francisco had a four-year contract to perform physical exams on local FBI agents and job applicants. When the FBI learned that Dr. [name removed] had AIDS, the San Francisco field office stopped using his services. An initial non-jury trial found that Dr. [name removed] did not have private right of action to sue the Federal government, and that his evasive answers as to his state of health and risk of transmission had prevented the FBI from learning the extent of risk. Upon appeal by Dr. [name removed]'s estate, however, a Federal court determined that the FBI had terminated Dr. [name removed] based on his HIV status, not on the quality of his work. The FBI's actions violated the 1973 Rehabilitation Act barring government-funded programs from discrimination based on disability.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... Ambient Air Quality Standard (NAAQS) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... of the 1997 8-hour ozone NAAQS as of the applicable date. DATES: Effective Date: This final rule will... action is EPA taking in this final rule? II. What is the background for this final action? III. What was...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-09-06
The 500-acre Petro-Chemical (Turtle Bayou) site is in Liberty County, Texas. Current land use in the area is divided among cropland, pasture, range, forest, and small rural communities. Since 1971, numerous undocumented disposal activities occurred onsite involving primarily petrochemical wastes. The ROD for OU2 focuses on three areas of contamination at the site affecting soil and ground water contamination, known as the main waste area, the east disposal area, and the Bayou disposal area. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene and xylenes; other organics including PAHs; and metals including lead. Themore » selected remedial action for the site includes treating 302,800 cubic yards of contaminated soil onsite using in-situ vapor extraction to remove VOCs, controlling vertical air infiltration using an engineered soil and synthetic liner cap; consolidating lead-contaminated soil in the Main Waste Area, followed by capping.« less
78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C.... DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139...
78 FR 58381 - Notice of Final Federal Agency Actions on State Highway 288 in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazardmore » areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.« less
Campbell; Heyes; Goldsmith
1999-07-01
Juvenile European starlings, Sturnus vulgaris, were allowed to observe a conspecific demonstrator using its beak to remove one of two distinctively coloured objects (i.e. a red or a black plug) from a hole in the lid of a plastic box. Both plugs could be removed by either pulling up on a loop of string inserted through the centre of the plug, or pushing down on the plug. When subsequently allowed access to the plugs, and rewarded with food for all removal responses, regardless of the object to which they were made and their direction, observer birds removed the same plug in the same direction as their demonstrator. These results suggest that the two-object/two-action paradigm is a valuable procedure for testing for the simultaneous effects of learning about a stimulus and a response, an object and an action, through conspecific observation. Copyright 1999 The Association for the Study of Animal Behaviour.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-09-24
The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selectedmore » remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.« less
Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. P. Floerke
Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idahomore » State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.« less
Demos, Alexander P.; Carter, Daniel J.; Wanderley, Marcelo M.; Palmer, Caroline
2017-01-01
We examined temporal synchronization in joint music performance to determine how social status, auditory feedback, and animacy influence interpersonal coordination. A partner’s coordination can be bidirectional (partners adapt to the actions of one another) or unidirectional (one partner adapts). According to the dynamical systems framework, bidirectional coordination should be the optimal (preferred) state during live performance. To test this, 24 skilled pianists each performed with a confederate while their coordination was measured by the asynchrony in their tone onsets. To promote social balance, half of the participants were told the confederate was a fellow participant – an equal social status. To promote social imbalance, the other half was told the confederate was an experimenter – an unequal social status. In all conditions, the confederate’s arm and finger movements were occluded from the participant’s view to allow manipulation of animacy of the confederate’s performances (live or recorded). Unbeknownst to the participants, half of the confederate’s performances were replaced with pre-recordings, forcing the participant into unidirectional coordination during performance. The other half of the confederate’s performances were live, which permitted bidirectional coordination between performers. In a final manipulation, both performers heard the auditory feedback from one or both of the performers’ parts removed at unpredictable times to disrupt their performance. Consistently larger asynchronies were observed in performances of unidirectional (recorded) than bidirectional (live) performances across all conditions. Participants who were told the confederate was an experimenter reported their synchrony as more successful than when the partner was introduced as a fellow participant. Finally, asynchronies increased as auditory feedback was removed; removal of the confederate’s part hurt coordination more than removal of the participant’s part in live performances. Consistent with the assumption that bidirectional coupling yields optimal coordination, an unresponsive partner requires the other member to do all the adapting for the pair to stay together. PMID:28261123
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the research misconduct issues and the HHS administrative actions become final and will be implemented, except that the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... on behalf of the applicant; (4) The decision of the DRB; (5) Advisory opinions relief upon for the final action; and (6) The final action on the DRB decision by the Commandant or Secretary. (b) The... the decision of the DRB and the final action thereon is made available for public inspection and...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED... Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of...
12 CFR Appendix A to Part 360 - Non-Monetary Transaction File Structure
Code of Federal Regulations, 2010 CFR
2010-01-01
... maturity dates, but all owners are the same Character (25). 7. PH_Hold_Action Hold ActionThe requested hold... = Add 8. PH_Hold_Amt Hold Amount Decimal (14,2). Dollar amount of the FDIC hold to be removed or added 9. PH_Hold_Desc Hold Description Character (225). FDIC hold to be removed or added [73 FR 41197, July 17...
The purpose of this memorandum is to provide additional clarification on the applicability of the October 5, 1998, joint Environmental Protection Agency (EPA) and the Department of Energy (DOE) agreement on DOE decommissioning projects titled Review of Department of Energy Non-Time Critical Removal Actions by the National Remedy Review Board.
12 CFR Appendix A to Part 360 - Non-Monetary Transaction File Structure
Code of Federal Regulations, 2013 CFR
2013-01-01
... maturity dates, but all owners are the same Character (25). 7. PH_Hold_Action Hold ActionThe requested hold... = Add 8. PH_Hold_Amt Hold Amount Decimal (14,2). Dollar amount of the FDIC hold to be removed or added 9. PH_Hold_Desc Hold Description Character (225). FDIC hold to be removed or added [73 FR 41197, July 17...
12 CFR Appendix A to Part 360 - Non-Monetary Transaction File Structure
Code of Federal Regulations, 2014 CFR
2014-01-01
... maturity dates, but all owners are the same Character (25). 7. PH_Hold_Action Hold ActionThe requested hold... = Add 8. PH_Hold_Amt Hold Amount Decimal (14,2). Dollar amount of the FDIC hold to be removed or added 9. PH_Hold_Desc Hold Description Character (225). FDIC hold to be removed or added [73 FR 41197, July 17...
12 CFR Appendix A to Part 360 - Non-Monetary Transaction File Structure
Code of Federal Regulations, 2011 CFR
2011-01-01
... maturity dates, but all owners are the same Character (25). 7. PH_Hold_Action Hold ActionThe requested hold... = Add 8. PH_Hold_Amt Hold Amount Decimal (14,2). Dollar amount of the FDIC hold to be removed or added 9. PH_Hold_Desc Hold Description Character (225). FDIC hold to be removed or added [73 FR 41197, July 17...
12 CFR Appendix A to Part 360 - Non-Monetary Transaction File Structure
Code of Federal Regulations, 2012 CFR
2012-01-01
... maturity dates, but all owners are the same Character (25). 7. PH_Hold_Action Hold ActionThe requested hold... = Add 8. PH_Hold_Amt Hold Amount Decimal (14,2). Dollar amount of the FDIC hold to be removed or added 9. PH_Hold_Desc Hold Description Character (225). FDIC hold to be removed or added [73 FR 41197, July 17...
Yang, Shangyuan; Liang, Zhiwei; Yu, Huadong; Wang, Yunlong; Chen, Yingxu
2014-02-01
Micro-electrolysis was applied in the present study to investigate the effect of pH, iron-carbon mass ratio, contact time, and treatment batch on the removal efficiency of chemical oxygen demand (COD) within an aminosilicone emulsion. The results exhibited that the removal efficiency of COD decreased linearly with the batch increase, and this tendency was consistent under the various conditions. The adsorption of activated carbons contributes a large portion to the elimination of COD within the aminosilicone emulsion. The oxidation action of iron-carbon micro-electrolysis was proven and the aminosilicone emulsion's COD removal contribution was approximately 16%. Aminosilicone polymers were adsorbed on the surface of activated carbons and iron chips, which contributes to the decline of COD removal efficiency and limits the contribution of oxidation action.
5 CFR 432.105 - Proposing and taking action based on unacceptable performance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... unacceptable performance. 432.105 Section 432.105 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE BASED REDUCTION IN GRADE AND REMOVAL ACTIONS § 432.105 Proposing and taking action based on unacceptable performance. (a) Proposing action based on unacceptable performance...
77 FR 47517 - Enforcement Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Part 573 Enforcement Actions AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY: The National Indian Gaming... be considered final agency action by a court even though it is issued by NIGC staff rather than the...
Hospital cannot be held liable for breach of patient's privacy.
1997-04-04
The Minnesota Court of Appeals ruled that a law guaranteeing the confidentiality of a patient's medical records did not create a private cause of actions for damages when the patient's HIV was revealed. The plaintiff, known as [name removed], requested that his stepbrother not be told his HIV status. A relative gained access to his medical file while working at a medical center and disclosed [name removed]'s HIV status to his stepbrother. [name removed] sued the relative and the hospital. The district court ruled that he did not have a cause of action against the hospital and the Court of Appeals agreed. The State does not recognize claims for an invasion of privacy under the Minnesota Patients Bill of Rights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... enactment of UMTRCA to perform decontamination, decommissioning, reclamation, and other remedial action... contaminated soil, disposal of process wastes, removal actions, air pollution abatement measures, mill and... subpart C of this part. Decontamination, decommissioning, reclamation, and other remedial action means...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.
Snow removal performance metrics : final report.
DOT National Transportation Integrated Search
2017-05-01
This document is the final report for the Clear Roads project entitled Snow Removal Performance Metrics. The project team was led by researchers at Washington State University on behalf of Clear Roads, an ongoing pooled fund research effort focused o...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2003, Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 02-37-01, Cellar & Mud Pit • CAS 02-37-03, Cellar & Mud Pit • CAS 02-37-04, Cellar & Mud Pit • CAS 02-37-05, Cellar & Mud Pit • CAS 02-37-06, Cellar & Mud Pit • CAS 02-37-07, Cellar & Mud Pit • CAS 02-37-10, Cellar & Mud Pit • CAS 02-37-11, Cellar & Mud Pit • CAS 02-37-12, Cellar & Mud Pit • CAS 02-37-13, Cellar & Mud Pit • CAS 02-37-14, Cellar & Mud Pit • CAS 02-37-15, Cellar & Mud Pit • CAS 02-37-16, Cellar & Mud Pit • CAS 02-37-17, Cellar • CAS 02-37-18, Cellar & Tanks These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESPONSIBILITY ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member... well as the Proceeding Clerk and Secretary of the Commission, with a written notice of any final...
ERIC Educational Resources Information Center
Southern Regional Education Board (SREB), 2010
2010-01-01
The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. This report presents final legislative and budget actions in…
40 CFR 35.6200 - Eligibility for removal Cooperative Agreements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Removal Response Cooperative Agreements § 35.6200 Eligibility for...
40 CFR 35.6200 - Eligibility for removal Cooperative Agreements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Removal Response Cooperative Agreements § 35.6200 Eligibility for...
40 CFR 35.6200 - Eligibility for removal Cooperative Agreements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Removal Response Cooperative Agreements § 35.6200 Eligibility for...
40 CFR 35.6200 - Eligibility for removal Cooperative Agreements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Removal Response Cooperative Agreements § 35.6200 Eligibility for...
77 FR 66910 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice...). A claim seeking judicial review of the Federal agency actions on the highway project will be barred...
DOE Office of Scientific and Technical Information (OSTI.GOV)
P.C. Weaver
2009-04-29
The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site wasmore » removed in its entirety.« less
Secondary Processors and Landfills — Partnerships that Work
NASA Astrophysics Data System (ADS)
Brewer, Ben; Roth, David J.
Using Best Available Technology is a phase that we often hear when there are environmental discussions on aluminum dross and secondary salt slag processing. The reality is best available technology is a mix between efficient removal of the valuable aluminum, oxides, misc metals and flux from dross and salt cake. This combined with conscientious land fill disposal of those items that finally, at this time, have no economic use is the reality of a company's best available actions. Recycling processes must be looked at with both the economic and environmental benefits weighed for their responsible implementation. This paper will discuss how this is done on a practical basis by Recycling Ventures (a secondary processor) and Environmental Waste Solutions (a Title II landfill), for the aluminum industry.
Patil, P A; Ankola, A V; Hebbal, M I; Patil, A C
2015-02-01
To compare the effectiveness of abrasive component (perlite/calcium carbonate) and enzymatic component (papain and bromelain) of whitening toothpaste in removal of extrinsic stains. This study is a randomized, triple blind and parallel group study in which 90 subjects aged 18-40 years were included. At baseline, stains scores were assessed by Macpherson's modification of Lobene Stain Index and subjects were randomly assigned to two groups with 45 subjects in each. Group 1 used whitening toothpaste with enzymatic action and group 2 with abrasive action. After 1 month, stain scores were assessed for the effectiveness of the two toothpastes and 2 months later to check the stain prevention efficacy. Wilcoxson's test was used to compare between baseline 1 and 2 months stain scores, and Mann-Witney U-test was applied for intragroup comparison. The mean baseline total stain score for the subjects allocated to the enzymatic toothpaste was 37.24 ± 2.11 which reduced to 30.77 ± 2.48 in 1 month, and for the abrasive paste, total stain reduced from 35.08 ± 2.96 to 32.89 ± 1.95. The reductions in total stain scores with both the pastes were significant compared with baseline stain scores (at 1 month Group 1, P = 0.0233 and Group 2, P = 0.0324; at 2 months, Group 1 P = 0.0356). Both the toothpastes proved to be equally good in removal of extrinsic stains; however, the enzymatic paste showed better results as compared to abrasive toothpaste. Whitening toothpaste with abrasive action and enzymatic action are equally effective in removal of extrinsic stains; however, whitening toothpaste with abrasive action needs to be used with caution. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
77 FR 64367 - Removal of International Restricted Delivery From the Competitive Product List
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... POSTAL SERVICE Removal of International Restricted Delivery From the Competitive Product List AGENCY: Postal Service\\TM\\. ACTION: Notice. SUMMARY: The Postal Service hereby provides notice that it has filed a request with the Postal Regulatory Commission to remove International Restricted Delivery...
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Effects of fear factors in disease propagation
NASA Astrophysics Data System (ADS)
Wang, Yubo; Xiao, Gaoxi; Wong, Limsoon; Fu, Xiuju; Ma, Stefan; Hiang Cheng, Tee
2011-09-01
Upon an outbreak of a dangerous infectious disease, people generally tend to reduce their contacts with others in fear of getting infected. Such typical actions apparently help slow down the spreading of infection. Thanks to today's broad public media coverage, the fear factor may even contribute to preventing an outbreak from happening. We are motivated to study such effects by adopting a complex network approach. First we evaluate the simple case where connections between individuals are randomly removed due to the fear factor. Then we consider a different case where each individual keeps at least a few connections after contact reduction. Such a case is arguably more realistic since people may choose to keep a few social contacts, e.g., with their family members and closest friends, at any cost. Finally, a study is conducted on the case where connection removals are carried out dynamically while the infection is spreading out. Analytical and simulation results show that the fear factor may not easily prevent an epidemic outbreak from happening in scale-free networks. However, it significantly reduces the fraction of the nodes ever getting infected during the outbreak.
Ma, Weiwei; Han, Yuxing; Xu, Chunyan; Han, Hongjun; Ma, Wencheng; Zhu, Hao; Li, Kun; Wang, Dexin
2018-03-01
The aim of this work was to study an integration of micro-electrolysis with biological reactor (MEBR) for strengthening removal of phenolic compounds in coal gasification wastewater (CGW). The results indicated MEBR achieved high efficiencies in removal of COD and phenolic compounds as well as improvement of biodegradability of CGW under the micro-oxygen condition. The integrated MEBR process was more favorable to improvement of the structural stability of activated sludge and biodiversity of specific functional microbial communities. Especially, Shewanella and Pseudomonas were enriched to accelerate the extracellular electron transfer, finally facilitating the degradation of phenolic compounds. Moreover, MEBR process effectively relieved passivation of Fe-C filler surface and prolonged lifespan of Fe-C filler. Accordingly, the synergetic effect between iron-carbon micro-electrolysis (ICME) and biological action played a significant role in performance of the integrated process. Therefore, the integrated MEBR was a promising practical process for enhancing CGW treatment. Copyright © 2017 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
...On January 30, 2012, the EPA proposed revisions to several provisions of the final National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources. The proposed revisions were made, in part, in response to a petition for reconsideration received by the Administrator following the promulgation of the October 29, 2009, final rule (``2009 final rule''). In this action, the EPA is finalizing those amendments, lifting the stay of the title V permit requirement issued on March 14, 2011, and lifting the stay of the final rule issued on October 25, 2012. In addition, this final action includes revisions to the EPA's approach for addressing malfunctions and standards applicable during startup and shutdown periods. This final action also includes amendments and technical corrections to the final rule to clarify applicability and compliance issues raised by stakeholders subject to the 2009 final rule. The revisions to the final rule do not reduce the level of environmental protection or emissions control on sources regulated by this rule but provide flexibility and clarity to improve implementation. This action also extends the compliance date for existing sources and the EPA's final response to all issues raised in the petition for reconsideration.
78 FR 64595 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Illinois AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Sec. 139(l)(1). The actions relate to a proposed highway project, Circle Interchange, I-90/I-94 and I...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2011-08-01
CAU 561 comprises 10 CASs: (1) 01-19-01, Waste Dump; (2) 02-08-02, Waste Dump and Burn Area; (3) 03-19-02, Debris Pile; (4) 05-62-01, Radioactive Gravel Pile; (5) 12-23-09, Radioactive Waste Dump; (6) 22-19-06, Buried Waste Disposal Site; (7) 23-21-04, Waste Disposal Trenches ; (8) 25-08-02, Waste Dump; (9) 25-23-21, Radioactive Waste Dump; and (10) 25-25-19, Hydrocarbon Stains and Trench. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 561 with no further corrective action. The purpose of the CAI was to fulfill the following data needs as defined during the DQO process:more » (1) Determine whether COCs are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to complete appropriate corrective actions. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) No contamination exceeding FALs was identified at CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06. (2) The surface and subsurface soil within the burn area at CAS 02-08-02 contains arsenic and lead above the FALs of 23 milligrams per kilogram (mg/kg) and 800 mg/kg, respectively. The surface and subsurface soil within the burn area also contains melted lead slag (potential source material [PSM]). The soil within the waste piles contains polyaromatic hydrocarbons (PAHs) above the FALs. The contamination within the burn area is spread throughout the area, as it was not feasible to remove all the PSM (melted lead), while at the waste piles, the contamination is confined to the piles. (3) The surface and subsurface soils within Trenches 3 and 5 at CAS 23-21-04 contain arsenic and polychlorinated biphenyls (PCBs) above the FALs of 23 mg/kg and 0.74 mg/kg, respectively. The soil was removed from both trenches, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead bricks and counterweights were also removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. (4) The concrete-like material at CAS 25-08-02 contains arsenic above the FAL of 23 mg/kg. This concrete-like material was removed, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead-acid batteries were also removed, and the soil below the batteries does not contain contamination that exceeds the FAL for lead. (5) The surface soils within the main waste dump at the posted southern radioactive material area (RMA) at CAS 25-23-21 contain cesium (Cs)-137 and PCBs above the FALs of 72.9 picocuries per gram (pCi/g) and 0.74 mg/kg, respectively. The soil was removed from the RMA, and the soil that remains at this CAS does not contain contamination exceeding the FALs. (6) The surface and subsurface soils at CAS 25-25-19 do not contain contamination exceeding the FALs. In addition, lead bricks were removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. The following best management practices were implemented: (1) Housekeeping debris at CASs 02-08-02, 23-21-04, 25-08-02, 25-23-21, and 25-25-19 was removed and disposed of; (2) The open trenches at CAS 23-21-04 were backfilled; (3) The waste piles at CAS 25-08-02 were removed and the area leveled to ground surface; and (4) The remaining waste piles at the main waste dump at CAS 25-23-21 were leveled to ground surface. Therefore, NNSA/NSO provides the following recommendations: (1) No further action for CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06; (2) Closure in place with an FFACO use restriction (UR) at CAS 02-08-02 for the remaining PAH-, arsenic-, and lead-contaminated soil, and the melted lead PSM. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and the NNSA/NSO CAU/CAS files; (3) No further corrective action at CAS 23-21-04, as the lead bricks and counterweights (PSM) have been removed, and the COCs of arsenic and PCBs in soil have been removed; (4) No further corrective action at CAS 25-08-02, as the COC of arsenic in soil has been removed, and the lead-acid batteries have been removed; (5) No further corrective action at CAS 25-23-21, as the COCs of Cs-137 and PCBs in soil have been removed, and the cast-iron pipes have been removed and disposed of; (6) No further corrective action at CAS 25-25-19, as the lead bricks (PSM) been removed; (7) A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 561; and (8) Corrective Action Unit 561 should be moved from Appendix III to Appendix IV of the FFACO.« less
78 FR 17748 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...; telephone: 801-955-3516; email: david.cox@dot.gov . The FHWA Utah Division Office's normal business hours... announces actions taken by the FWHA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the FHWA actions on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
... Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by the..., that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed Physical... 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway...
77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
.... ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
...-3516; email: David.Cox@dot.gov . The FHWA Utah Division's normal business hours are Monday through... announces actions taken by the FHWA and other Federal Agencies that are final within the meaning of 23 U.S.C... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review...
78 FR 60021 - Proposed Collection: Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-120616-03(TD 9346 Final Regulations and Removal of Temporary Regulations)] Proposed Collection: Comment Request for Regulation Project AGENCY.... Regulation Project Number: REG-120616-03 (T.D. 9346 Final Regulations and Removal of Temporary Regulations...
77 FR 47164 - Actions Taken Pursuant to Executive Order 13382
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
... DEPARTMENT OF THE TREASURY Office of Foreign Assets Control Actions Taken Pursuant to Executive Order 13382 AGENCY: Office of Foreign Assets Control, TD. ACTION: Notice. SUMMARY: The Treasury Department's Office of Foreign Assets Control (``OFAC'') is unblocking and removing three entities from OFAC...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... (FHWA), U.S. DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
8 CFR 1241.6 - Administrative stay of removal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Removal § 1241.6 Administrative stay of removal. (a) An alien under a final order of deportation or removal may seek a stay of deportation or removal from the Department of Homeland Security as provided in... Section 1241.6 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT OF JUSTICE...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Certificate (Authorization) have their letter of Authorization in their physical possession or readily... and Regulatory Review.'' While this action removes the burden for affected individuals to carry their... the duration of certificates and tests of physical fitness. This rule removes a regulatory provision...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
Michaelowa, A; Rolfe, C
2001-09-01
Current "business as usual" projections suggest greenhouse gas emissions from industrialized nations will grow substantially over the next decade. However, if it comes into force, the Kyoto Protocol will require industrialized nations to reduce emissions to an average of 5% below 1990 levels in the 2008-2012 period. Taking early action to close this gap has a number of advantages. It reduces the risks of passing thresholds that trigger climate change "surprises." Early action also increases future generations' ability to choose greater levels of climate protection, and it leads to faster reductions of other pollutants. From an economic sense, early action is important because it allows shifts to less carbon-intensive technologies during the course of normal capital stock turnover. Moreover, many options for emission reduction have negative costs, and thus are economically worthwhile, because of paybacks in energy costs, healthcare costs, and other benefits. Finally, early emission reductions enhance the probability of successful ratification and lower the risk of noncompliance with the protocol. We discuss policy approaches for the period prior to 2008. Disadvantages of the current proposals for Credit for Early Action are the possibility of adverse selection due to problematic baseline calculation methods as well as the distributionary impacts of allocating a part of the emissions budget already before 2008. One simple policy without drawbacks is the so-called baseline protection, which removes the disincentive to early action due to the expectation that businesses may, in the future, receive emission rights in proportion to past emissions. It is particularly important to adopt policies that shift investment in long-lived capital stock towards less carbon-intensive technologies and to encourage innovation and technology development that will reduce future compliance costs.
Rhatigan, Maedbh; McElnea, Elizabeth; Murtagh, Patrick; Stephenson, Kirk; Harris, Elaine; Connell, Paul; Keegan, David
2018-01-01
To report anatomic and visual outcomes following silicone oil removal in a cohort of patients with complex retinal detachment, to determine association between duration of tamponade and outcomes and to compare patients with oil removed and those with oil in situ in terms of demographic, surgical and visual factors. We reported a four years retrospective case series of 143 patients with complex retinal detachments who underwent intraocular silicone oil tamponade. Analysis between anatomic and visual outcomes, baseline demographics, duration of tamponade and number of surgical procedures were carried out using Fisher's exact test and unpaired two-tailed t -test. One hundred and six patients (76.2%) had undergone silicone oil removal at the time of review with 96 patients (90.6%) showing retinal reattachment following oil removal. Duration of tamponade was not associated with final reattachment rate or with a deterioration in best corrected visual acuity (BCVA). Patients with oil removed had a significantly better baseline and final BCVA compared to those under oil tamponade ( P =0.0001, <0.0001 respectively). Anatomic and visual outcomes in this cohort are in keeping with those reported in the literature. Favorable outcomes were seen with oil removal but duration of oil tamponade does not affect final attachment rate with modern surgical techniques and should be managed on a case by case basis.
25 CFR 62.10 - Action by the Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Secretary for final action together with any relevant information or records; the recommendations of the... to the Assistant Secretary for final action together with any relevant information or records; the... record as presented together with such additional information as may be considered pertinent. Any...
40 CFR 300.525 - State involvement in removal actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES... removal is conducted at an NPL site that was operated by a state or political subdivision at the time of...
75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed within...
This memorandum requests approval for a time-critical removal action at the 27 residential properties that compose the Oak Canyon Site located in the Village of Paguate, Pueblo of Laguna, near Cibola County, New Mexico.
1995-03-24
The Equal Employment Opportunity Commission (EEOC) has filed suit against the nationally based [name removed] after hair stylist "John Doe" was fired shortly after his employer discovered he was HIV-positive. According to EEOC officials, [name removed] claimed that John Doe was fired for failing to attend a mandatory training class, but the EEOC said the real motivation was the fact that Doe was regarded as disabled. The suit asked the U.S. District Court to enjoin [name removed] from discharging employees based on their HIV status, reinstate Doe, and order the salon to pay Doe back wages, other compensatory damages, and punitive damages. The lawsuit comes just two months after P.M.K. Corporation, which does business as Cost Cutters of [name removed], agreed to pay $13,200 to stylist "Pat Doe," who was fired after her employer discovered she was HIV-positive. The company claimed Pat Doe was terminated because of a layoff, but the EEOC concluded the real reason was her HIV status. Both actions were filed by the EEOC under the Americans with Disabilities Act (ADA). An EEOC representative said that the fact that both actions involved hair salons was coincidental.
2013-05-31
ACM). The FEW Environmental Planning Function ( EPF ) conducted the analysis of this proposed action. 2. PURPOSE AND NEED FOR ACTION. The... EPF determined that the proposed action has the potential to affect Air Quality, Occupational Safety and Health, Cultural Resources and Hazardous Waste
76 FR 30510 - Golden Parachute and Indemnification Payments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... penalty, removed from office or is required to cease and desist from an action or take an affirmative... any affirmative action with respect to the credit union. The definition would not include any... or prohibition, or an order against the IAP to cease and desist from or take any affirmative action...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... Compounds and Emissions Banking and Trading AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed... Emission of Sulfur Compounds'' will remove redundant sulfur dioxide standards and outdated compliance dates... a second comment period on this action. Any parties interested in commenting on this action should...
Meessen, Bruno; Hercot, David; Noirhomme, Mathieu; Ridde, Valéry; Tibouti, Abdelmajid; Tashobya, Christine Kirunga; Gilson, Lucy
2011-11-01
In recent years, governments of several low-income countries have taken decisive action by removing fully or partially user fees in the health sector. In this study, we review recent reforms in six sub-Saharan African countries: Burkina Faso, Burundi, Ghana, Liberia, Senegal and Uganda. The review describes the processes and strategies through which user fee removal reforms have been implemented and tries to assess them by referring to a good practice hypotheses framework. The analysis shows that African leaders are willing to take strong action to remove financial barriers met by vulnerable groups, especially pregnant women and children. However, due to a lack of consultation and the often unexpected timing of the decision taken by the political authorities, there was insufficient preparation for user fee removal in several countries. This lack of preparation resulted in poor design of the reform and weaknesses in the processes of policy formulation and implementation. Our assessment is that there is now a window of opportunity in many African countries for policy action to address barriers to accessing health care. Mobilizing sufficient financial resources and obtaining long-term commitment are obviously crucial requirements, but design details, the formulation process and implementation plan also need careful thought. We contend that national policy-makers and international agencies could better collaborate in this respect.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
...We, the U.S. Fish and Wildlife Service (Service), propose to remove the regulations that govern the southern sea otter (Enhydra lutris nereis) translocation program, including the establishment of an experimental population of southern sea otters, and all associated management actions. We are also proposing to amend the Authority citation for 50 CFR part 17 by removing the reference to Public Law 99- 625, the statute that authorized the Secretary to promulgate regulations establishing the southern sea otter translocation program. Removal of the regulations will terminate the program. We are proposing this action because we believe that the southern sea otter translocation program has failed to fulfill its purpose, as outlined in the southern sea otter translocation plan, and that our recovery and management goals for the species cannot be met by continuing the program. Our conclusion is based, in part, on an evaluation of the program against specific failure criteria established at the program's inception. This proposed action would terminate the designation of the experimental population of southern sea otters, abolish the southern sea otter translocation and management zones, and eliminate the current requirement to remove southern sea otters from San Nicolas Island and the management zone. This proposed rule would also eliminate future actions, required under the current regulations, to capture and relocate southern sea otters for the purpose of establishing an experimental population, and to remove southern sea otters in perpetuity from an ``otter-free'' management zone. As a result, it would allow southern sea otters to expand their range naturally into southern California waters. We have prepared a revised draft supplemental environmental impact statement (SEIS) and an initial regulatory flexibility analysis (IRFA) to accompany this proposed rule.
75 FR 23311 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... Rule 19d-1 (17 CFR 240.19d-1)--Notices by Self-Regulatory Organizations of Final Disciplinary Actions... agency concerning the following final SRO actions: (1) Disciplinary sanctions (including summary... Rule requires that such actions be promptly reported to the Commission. The Rule also requires that the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.28 Section 8.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Summary Actions § 8.28 Final decision. Each exchange shall...
Easy insert, easy release toggle bolt fastener
NASA Technical Reports Server (NTRS)
Kubokawa, C. C.
1970-01-01
Releasable pin-type toggle bolt fastener is constructed so that, when positioned in hole, toggle action prevents its removal and locknut anchors it firmly in place. Fastener is easily removed by loosening locknut and retraction of toggle wings.
Total Quality Management (TQM): Group Dynamics Workshop
1990-05-15
interactions with other OSD decision-making bodies. " Remove barriers /facilitate implementation. " Direct action on unresolved process problems referred...TQM leadership. - Total Quality Management FUNCTIONS: * Translate goals to tangible internal initiatives. " Remove barriers . " Establish and...Quality Management FUNCTIONS: • Identify and remove barriers . " Develop practical process improvements. " Install solutions and measurement systems for
78 FR 68995 - Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
...-AA00 Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA AGENCY: Coast Guard, DHS. ACTION... waters of the Oakland Estuary just north of the Park Street Bridge in Alameda, CA in support of the Oakland Estuary Closure for the Vessel Removal Project on November 4, 2013 through November 22, 2013. This...
21 CFR 314.162 - Removal of a drug product from the list.
Code of Federal Regulations, 2014 CFR
2014-04-01
... (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated Applications § 314.162 Removal of a drug product from the list. (a) FDA will remove a... that the withdrawal from the market has ceased or is not for safety or effectiveness reasons. (b) FDA...
21 CFR 314.162 - Removal of a drug product from the list.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated Applications § 314.162 Removal of a drug product from the list. (a) FDA will remove a... that the withdrawal from the market has ceased or is not for safety or effectiveness reasons. (b) FDA...
21 CFR 314.162 - Removal of a drug product from the list.
Code of Federal Regulations, 2012 CFR
2012-04-01
... (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated Applications § 314.162 Removal of a drug product from the list. (a) FDA will remove a... that the withdrawal from the market has ceased or is not for safety or effectiveness reasons. (b) FDA...
21 CFR 314.162 - Removal of a drug product from the list.
Code of Federal Regulations, 2013 CFR
2013-04-01
... (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated Applications § 314.162 Removal of a drug product from the list. (a) FDA will remove a... that the withdrawal from the market has ceased or is not for safety or effectiveness reasons. (b) FDA...
21 CFR 314.162 - Removal of a drug product from the list.
Code of Federal Regulations, 2011 CFR
2011-04-01
... (CONTINUED) DRUGS FOR HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated Applications § 314.162 Removal of a drug product from the list. (a) FDA will remove a... that the withdrawal from the market has ceased or is not for safety or effectiveness reasons. (b) FDA...
78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Administration (FHWA), Department of Transportation (DOT). ACTION: Notice of limitations on claims for judicial... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
75 FR 42 - Establishment of Class E Airspace; Spencer, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule; confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that establishes Class E Airspace at Spencer, WV. This action enhances the safety and airspace management of Boggs...
76 FR 51462 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Utah AGENCY: Federal Highway Administration (FHWA), USDOT. ACTION: Notice of... highway project, Tooele Midvalley Highway, from I-80 to State Route 36 Tooele County, State of Utah. Those...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 5 2014-07-01 2014-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 5 2010-07-01 2010-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 5 2012-07-01 2012-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 5 2011-07-01 2011-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 5 2013-07-01 2013-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
78 FR 30345 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... seeking Commission review of final disciplinary actions against them taken by self-regulatory... information provided in the application filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary sanctions; (2) denial or conditioning of membership, participation or...
40 CFR Appendix D to Part 300 - Appropriate Actions and Methods of Remedying Releases
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. D Appendix D to Part 300—Appropriate Actions and Methods... contaminated soil, sediment, or waste, the following types of response actions shall generally be considered: removal, treatment, or containment of the soil, sediment, or waste to reduce or eliminate the potential...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; proposed incidental harassment... within the action area. Two Steller sea lions (Eumetopias jubatus) were observed, at a distance, swimming... 2011. They do not breed in Puget Sound, do not regularly use the action area, and, as such, are not...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-28
The 200-acre Kin-Buc Landfill consists of several inactive disposal areas and is located in Edison Township, Middlesex County, New Jersey. Land use in the area is predominantly industrial and commercial, with some residences within 2 miles north of the site. No drinking water supply wells are located within a 2-mile radius of the site. As a result of an oil spill in 1976, EPA conducted an investigation of the property. In 1980, clean-up activities were initiated under the Clean Water Act and included removal, treatment, and disposal of leachate and drummed waste. The ROD addresses a final remedy for OU2more » consisting of the sediment and groundwater in the Edmonds Creek wetlands area, Mill Brook/Martins Creek, Mound B, and the low-lying area. The primary contaminants of concern affecting the sediment and ground water are VOCs, including benzene and xylenes; other organics, including PAHs, PCBs, and pesticides; and metals, including arsenic and lead. The selected remedy for the site are included.« less
78 FR 35201 - Endangered and Threatened Wildlife and Plants; Listing All Chimpanzees as Endangered
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-12
...We, the U.S. Fish and Wildlife Service, propose to list all chimpanzees (Pan troglodytes) as endangered under the Endangered Species Act of 1973, as amended (Act). We are taking this action in response to a petition to list the entire species, whether in the wild or in captivity, as endangered under the Act. This proposal constitutes our 12-month finding on the petition and announces our finding that listing all chimpanzees as endangered is warranted. This document also serves as our 5-year review of the species. If we finalize this rule as proposed, we would eliminate the separate classification of captive and wild chimpanzees under the Act and extend the Act's protections to captive chimpanzees in the United States. In addition, we propose to amend the special rule for primates to remove chimpanzees from the rule. If the listing of all chimpanzees as endangered is finalized, the provisions of the special rule can no longer be applied to captive chimpanzees. We seek comments from the public on this proposed rule.
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
77 FR 61654 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed State Route 11 and Otay Mesa East Land Port of Entry in the City and County of San Diego, State of California. These actions grant licenses, permits, and approvals for the project.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
...-AI12 Defense Federal Acquisition Regulation Supplement: Removal of DFARS Coverage on Contractors... the Defense Federal Acquisition Regulation Supplement (DFARS) to remove coverage on contractors... duplicative DFARS coverage applicable solely to DoD. This final rule removes DFARS 225.370 and the clause at...
5 CFR 1201.126 - Final decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES Procedures for Original Jurisdiction Cases Special Counsel Disciplinary Actions § 1201.126 Final decisions. (a) In any action to discipline an employee, except as provided in paragraphs (b) or (c) of this... civil penalty not to exceed $1,100. 5 U.S.C. 1215(a)(3). (b) In any action in which the administrative...
Air removal device. [life support systems
NASA Technical Reports Server (NTRS)
Booth, F. W.; Bruce, R. A.
1981-01-01
The disclosure concerns a device suitable for removing air from water under both zero and one 'g' gravity conditions. The device is comprised of a pair of spaced membranes on being hydrophobic and the other being hydrophilic. The air-water mixture is introduced into the space therebetween, and the selective action of the membranes yields removal of the air from the water.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-16
... throughout the Western U.S./Canada Area. In addition, as of March 5, 2010, the catch of Eastern GB cod was 72...; removal of gear restrictions. SUMMARY: This action removes temporary gear restrictions in both the Eastern and Western U.S./Canada Areas for limited access Northeast (NE) multispecies vessels fishing on a NE...
49 CFR 26.87 - What procedures does a recipient use to remove a DBE's eligibility?
Code of Federal Regulations, 2011 CFR
2011-10-01
... proceedings. If, based on notification by the firm of a change in its circumstances or other information that... personnel that did not take part in actions leading to or seeking to implement the proposal to remove the...) Grounds for decision. You must not base a decision to remove eligibility on a reinterpretation or changed...
49 CFR 26.87 - What procedures does a recipient use to remove a DBE's eligibility?
Code of Federal Regulations, 2010 CFR
2010-10-01
... proceedings. If, based on notification by the firm of a change in its circumstances or other information that... personnel that did not take part in actions leading to or seeking to implement the proposal to remove the...) Grounds for decision. You must not base a decision to remove eligibility on a reinterpretation or changed...
This memorandum requests approval for a time-critical removal action at the II residential properties that compose the Rio San Jose Radiation Site located in Laguna, Mesita, Paraje, and Seama, Pueblo of Laguna located in Cibola County, New Mexico.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... County Auburn Public Library, (Auburn, CA MPS) 175 Almond St, Auburn, 11000153 OREGON Washington County... County St. Mary's Rectory, 1575 Second Ave, Cumberland, 11000152 OTHER ACTIONS: Request for REMOVAL has...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... Special Issuance of a Medical Certificate to Carry Their Letter of Authorization While Exercising Pilot... possession or readily accessible on the aircraft while exercising pilot privileges. DATES: The direct final... exercising pilot privileges. The FAA published a direct final rule on March 22, 2012 (77 FR 16664) to remove...
Removal of plutonium from hepatic tissue
Lindenbaum, Arthur; Rosenthal, Marcia W.
1979-01-01
A method is provided for removing plutonium from hepatic tissues by introducing into the body and blood stream a solution of the complexing agent DTPA and an adjunct thereto. The adjunct material induces aberrations in the hepatic tissue cells and removes intracellularly deposited plutonium which is normally unavailable for complexation with the DTPA. Once the intracellularly deposited plutonium has been removed from the cell by action of the adjunct material, it can be complexed with the DTPA present in the blood stream and subsequently removed from the body by normal excretory processes.
Asbestos Imperative: What You Must Do.
ERIC Educational Resources Information Center
AGB Reports, 1986
1986-01-01
Under federal regulation, all friable asbestos must be removed from buildings before undertaking major renovation or demolition. The American Council on Education is filing a national voluntary class action suit to recover from asbestos manufacturers the costs of removing asbestos-containing materials. (MLW)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-17
.... After EPA received an email from a concerned teacher, U.S. EPA conducted indoor air and sub-slab samples... indicate any level of contamination that warranted a removal action. The removal assessment was completed...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-10
... (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the U.S. Army... notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim... claim is filed on or before October 7, 2013. If this date falls on a Saturday, Sunday, or legal holiday...
Hamilton,; Rondorf, Dennis W.; Hampton,; Quinones,; Simondet,; Smith,
2011-01-01
For decades the long-standing conflict in the Klamath River Basin over water and fish resources has persisted. In an effort to resolve these disputes, PacifiCorp and interested parties negotiated, wrote, and signed the Klamath Hydroelectric Settlement Agreement (KHSA) in 2010, calling for the potential removal of the four lower dams on the Klamath River mainstem. The KHSA established a process known as the Secretarial Determination, which includes 1) conducting new scientific studies and a re-evaluation of existing studies found in the FERC record and from other sources, and 2) evaluating the potential environmental and human effects of such an action pursuant to National Environmental Policy Act, California Environmental Quality Act, and other applicable laws. In March 2012, the Secretary of the Interior will decide whether removal of these dams on the Klamath River: 1) will advance salmonid fisheries, and 2) is in the public interest. In this report, we summarize anticipated effects to fish resources under two management scenarios: 1) current conditions with dams in place and without the programs and actions in the Klamath Basin Restoration Agreement (KBRA), and 2) removal of the lower four dams plus programs and actions called for in the KBRA and KHSA. This information will aid the Secretary of the Interior in determining whether dam removal and implementation of KBRA will advance restoration of salmonid (salmon and trout) fisheries.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2014 CFR
2014-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2012 CFR
2012-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
10 CFR 51.92 - Supplement to the final environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... changes in the proposed action that are relevant to environmental concerns; or (2) There are new and..., technical, and other benefits and costs of the proposed action, to the extent that the final environmental... costs; (5) Include an analysis of other energy alternatives, to the extent that the final environmental...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2011 CFR
2011-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2010 CFR
2010-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
Decommissioning a phosphoric acid production plant: a radiological protection case study.
Stamatis, V; Seferlis, S; Kamenopoulou, V; Potiriadis, C; Koukouliou, V; Kehagia, K; Dagli, C; Georgiadis, S; Camarinopoulos, L
2010-12-01
During a preliminary survey at the area of an abandoned fertilizer plant, increased levels of radioactivity were measured at places, buildings, constructions and materials. The extent of the contamination was determined and the affected areas were characterized as controlled areas. After the quantitative and qualitative determination of the contaminated materials, the decontamination was planned and performed step by step: the contaminated materials were categorized according to their physical characteristics (scrap metals, plastic pipes, scales and residues, building materials, etc) and according to their level of radioactivity. Depending on the material type, different decontamination and disposal options were proposed; the most appropriate technique was chosen taking into account apart from technical issues, the legal framework, radiation protection issues, the opinion of the local authorities involved as well as the owner's wish. After taking away the biggest amount of the contaminated materials, an iterative process consisting of surveys and decontamination actions was performed in order to remove the residual traces of contamination from the area. During the final survey, no residual surface contamination was detected; some sparsely distributed low level contaminated materials deeply immersed into the soil were found and removed. Copyright © 2010 Elsevier Ltd. All rights reserved.
78 FR 15757 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... disciplinary actions against them taken by self-regulatory organizations (``SROs'') for which the Commission is... filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
78 FR 18271 - Proposed Modification of VOR Federal Airway V-345 in the Vicinity of Ashland, WI
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... the Vicinity of Ashland, WI AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: This action proposes to modify the legal description of VHF... decommissioned in 2013. The FAA is proposing this action to remove that portion of V-345 affected by the loss of...
75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
Code of Federal Regulations, 2010 CFR
2010-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
Code of Federal Regulations, 2011 CFR
2011-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
10 CFR 712.19 - Removal from HRP.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...
Hunt, Matthew R; Gogognon, Patrick; Ridde, Valéry
2014-02-20
Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public health action-research project. In carrying out such projects, careful attention and effort is needed to establish and maintain respectful relationships amongst those involved, acknowledge and address differences of power and position, and evaluate burdens and risks for individuals and groups.
2014-01-01
Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public health action-research project. In carrying out such projects, careful attention and effort is needed to establish and maintain respectful relationships amongst those involved, acknowledge and address differences of power and position, and evaluate burdens and risks for individuals and groups. PMID:24555854
Nakata, Kensuke
2017-11-01
Some male spiders exhibit female genital mutilation behaviour (FGM) by removing the female genital appendage (scape) to control the mating frequency of females. Female spiders have two, i.e. right and left, genital openings connected with separate spermathecae into which males transfer sperm successively using one pedipalp (secondary genitalia) at a time. Thus, males must complete at least two palpal insertions to fill both spermathecae, before FGM. The present study examined whether (i) scape removal is only associated with the second palpal insertion (one-action hypothesis) or (ii) two contralateral palpal insertions facilitate FGM, with each insertion cutting the basal part of the scape halfway (two-actions hypothesis). Experiments in which females were replaced after a male had made the first insertion did not support the one-action hypothesis, because scapes remained intact after the newly introduced virgin females received their first palpal insertion, which was the second insertion by the males. In comparison, mating experiments using two half-eunuchs (i.e. one of the palps of each male had been manually removed, forcing them to fill female spermatheca on one side only) supported the two-actions hypothesis. FGM was more frequent in females that received two contralateral palpal insertions than in females that received ipsilateral insertions.
2017-01-01
Some male spiders exhibit female genital mutilation behaviour (FGM) by removing the female genital appendage (scape) to control the mating frequency of females. Female spiders have two, i.e. right and left, genital openings connected with separate spermathecae into which males transfer sperm successively using one pedipalp (secondary genitalia) at a time. Thus, males must complete at least two palpal insertions to fill both spermathecae, before FGM. The present study examined whether (i) scape removal is only associated with the second palpal insertion (one-action hypothesis) or (ii) two contralateral palpal insertions facilitate FGM, with each insertion cutting the basal part of the scape halfway (two-actions hypothesis). Experiments in which females were replaced after a male had made the first insertion did not support the one-action hypothesis, because scapes remained intact after the newly introduced virgin females received their first palpal insertion, which was the second insertion by the males. In comparison, mating experiments using two half-eunuchs (i.e. one of the palps of each male had been manually removed, forcing them to fill female spermatheca on one side only) supported the two-actions hypothesis. FGM was more frequent in females that received two contralateral palpal insertions than in females that received ipsilateral insertions. PMID:29291078
Aksel, Hacer; Serper, Ahmet
2017-01-01
The aim of this study was to compare the ability of 17% ethylenediaminetetraacetic acid (EDTA) and QMix with different concentrations and time exposures of initial sodium hypochlorite (NaOCl) to remove the smear layer from the root canals. Eighty maxillary central incisors were used. After instrumentation, the teeth were divided into eight experimental groups according to the initial and final rinse. About 2.5% and 5% NaOCl were used during instrumentation and for 1 or 3 min was used as postinstrumentation initial irrigants, and 17% EDTA and QMix used as final irrigants. The apical and middle parts of the specimens were observed by scanning electron microscope. Data were analyzed using the Kruskal-Wallis, Mann-Whitney, and Friedman's test. Regardless of the type of final irrigant, QMix allowed more smear layer removal than EDTA after using 5% initial NaOCl for 3 min. In the apical part of the root canal walls, the smear layer was not completely removed. QMix and EDTA were similarly effective in smear layer removal at the middle parts of the root canal regardless of the concentration and time exposure of initial NaOCl, while none of the irrigation protocols was able to remove smear layer at the apical parts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Watkins-Johnson site is an active research and development, manufacturing, and industrial complex in Santa Cruz County, five miles north of Santa Cruz, California. The Watkins-Johnson Company has owned and operated the complex since 1963, conducting such activities as: metal machining, degreasing, metal plating, and photo laboratory activities. During these activities, a variety of organics, inorganics and metals were used. The primary contaminants of concern affecting the soil and ground water are VOCs including PCE and TCE, and metals including silver. The selected remedial action for the site includes soil vapor (vacuum) extraction with pretreatment of extracted vapors using GACmore » prior to ambient discharge; capping and grading contaminated soil areas to minimize the potential for mobilization of soil contaminants to the ground water; installing infiltration leachfields to prevent offsite migration of ground water contaminants in the perched zone; installing gravity drains to transfer the contaminated ground water from the perched zone to the regional aquifer zone for subsequent extraction; ground water pumping and onsite treatment to remove contamination from both the perched and regional zones using GAC adsorption with offsite regeneration of spent carbon. The estimated present worth cost for this remedial action is $2,156,243, which includes an estimated annual O and M cost of $167,820.« less
Spatial and Temporal Patterns of Biocide Action against Staphylococcus epidermidis Biofilms▿ ‡
Davison, William M.; Pitts, Betsey; Stewart, Philip S.
2010-01-01
The dynamic antimicrobial action of chlorine, a quaternary ammonium compound, glutaraldehyde, and nisin within biofilm cell clusters of Staphylococcus epidermidis was investigated using time-lapse confocal scanning laser microscopy. The technique allowed for the simultaneous imaging of changes in biofilm structure and disruption of cellular membrane integrity through the loss of an unbound fluorophore loaded into bacterial cells prior to antimicrobial challenge. Each of the four antimicrobial agents produced distinct spatial and temporal patterns of fluorescence loss. The antimicrobial action of chlorine was localized around the periphery of biofilm cell clusters. Chlorine was the only antimicrobial agent that caused any biofilm removal. Treatment with the quaternary ammonium compound caused membrane permeabilization that started at the periphery of cell clusters, then migrated steadily inward. A secondary pattern superimposed on the penetration dynamic suggested a subpopulation of less-susceptible cells. These bacteria lost fluorescence much more slowly than the majority of the population. Nisin caused a rapid and uniform loss of green fluorescence from all parts of the biofilm without any removal of biofilm. Glutaraldehyde caused no biofilm removal and also no loss of membrane integrity. Measurements of biocide penetration and action time at the center of cell clusters yielded 46 min for 10 mg liter−1 chlorine, 21 min for 50 mg liter−1 chlorine, 25 min for the quaternary ammonium compound, and 4 min for nisin. These results underscore the distinction between biofilm removal and killing and reinforce the critical role of biocide reactivity in determining the rate of biofilm penetration. PMID:20457816
Soares, Ana; Guieysse, Benoit; Mattiasson, Bo
2006-02-01
Bjerkandera sp. BOL 13 removed 95% of nonylphenol (at 9.7 mg nonylphenol L(-1) day(-1)) from aqueous medium after 5 days of incubation in agitated cultures. This removal rate decreased 2.5-fold in static cultures. By comparison, Trametes versicolor removed nonylphenol at 2.8 mg L(-1) day(-1) under conditions of static incubation, probably due to the action of laccase, but no growth was recorded in the agitated bottles.
2013 Cellulosic Biofuel Standard: Direct Final Rule
The direct final action is to revise the 2013 cellulosic biofuel standard. This action follows from EPA having granted API's and AFPM's petitions for reconsideration of the 2013 cellulosic biofuel standard published on August 15, 2013.
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
On January 18, 2001, the U.S. Environmental Protection Agency (EPA) finalized the maximum contaminant level (MCL) for arsenic at 0.01 mg/L. EPA subsequently revised the rule text to express the MCL as 0.010 mg/L (10 μg/L). The final rule requires all community and non-transient, ...
40 CFR 263.30 - Immediate action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... responsibilities determines that immediate removal of the waste is necessary to protect human health or the....30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO TRANSPORTERS OF HAZARDOUS WASTE Hazardous Waste Discharges § 263.30 Immediate action...
40 CFR 263.30 - Immediate action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... responsibilities determines that immediate removal of the waste is necessary to protect human health or the....30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO TRANSPORTERS OF HAZARDOUS WASTE Hazardous Waste Discharges § 263.30 Immediate action...
40 CFR 263.30 - Immediate action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... responsibilities determines that immediate removal of the waste is necessary to protect human health or the....30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO TRANSPORTERS OF HAZARDOUS WASTE Hazardous Waste Discharges § 263.30 Immediate action...
40 CFR 263.30 - Immediate action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... responsibilities determines that immediate removal of the waste is necessary to protect human health or the....30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO TRANSPORTERS OF HAZARDOUS WASTE Hazardous Waste Discharges § 263.30 Immediate action...
40 CFR 263.30 - Immediate action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... responsibilities determines that immediate removal of the waste is necessary to protect human health or the....30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO TRANSPORTERS OF HAZARDOUS WASTE Hazardous Waste Discharges § 263.30 Immediate action...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-09-14
The Baird and McGuire site is a former chemical manufacturing facility in northwest Holbrook, Massachusetts, approximately 14 miles south of Boston. From 1912 to 1983 the company operated a chemical manufacturing and batching facility on the property. Manufactured products included herbicides, pesticides, disinfectants, soaps, floor waxes and solvents. Waste disposal methods at the site included direct discharge into the soil, nearby brook and wetlands, and a former gravel pit (now covered) in the eastern portion of the site. EPA conducted a removal action at the site in 1983 after a waste lagoon overflowed spreading contaminants into the Cochato River. Themore » company ceased operating shortly thereafter. A second removal action was conducted in 1985, following the discovery of dioxin in site soils. EPA also conducted an Initial Remedial Measure at the site from 1985 through 1987 which involved constructing a new water main to direct water away from the site, removing building structures, and installing a temporary cap. The primary contaminants of concern affecting the sediment are organics including PAHs and pesticides, and metals including arsenic.« less
A Novel Stimulus Artifact Removal Technique for High-Rate Electrical Stimulation
Heffer, Leon F; Fallon, James B
2008-01-01
Electrical stimulus artifact corrupting electrophysiological recordings often make the subsequent analysis of the underlying neural response difficult. This is particularly evident when investigating short-latency neural activity in response to high-rate electrical stimulation. We developed and evaluated an off-line technique for the removal of stimulus artifact from electrophysiological recordings. Pulsatile electrical stimulation was presented at rates of up to 5000 pulses/s during extracellular recordings of guinea pig auditory nerve fibers. Stimulus artifact was removed by replacing the sample points at each stimulus artifact event with values interpolated along a straight line, computed from neighbouring sample points. This technique required only that artifact events be identifiable and that the artifact duration remained less than both the inter-stimulus interval and the time course of the action potential. We have demonstrated that this computationally efficient sample-and-interpolate technique removes the stimulus artifact with minimal distortion of the action potential waveform. We suggest that this technique may have potential applications in a range of electrophysiological recording systems. PMID:18339428
75 FR 65052 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans and other Federal agencies that are final within the meaning of 23 U.S.C...
78 FR 13746 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to...
75 FR 5168 - Notice of Final Federal Agency Action on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice... construction of an access-controlled, four-lane freeway on new right-of-way between the existing IL 6... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
... Exchange does not wish to remove the concept of the Select Symbols (and corresponding fees structure) from... volume in the Removed Symbols. Finally, these fees for the Removed Symbols will be the same as for all...
Seki, Akira; Miya, Tetsumasa
2011-03-01
As a result of recurring medical accidents, risk management in the medical setting has been given much attention. The announcement in August, 2000 by the Ministry of Health committee for formulating a standard manual for risk management, of a "Risk management manual formulation guideline" has since been accompanied by the efforts of numerous medical testing facilities to develop such documents. In 2008, ISO/TS 22367:2008 on "Medical laboratories-Reduction of error through risk management and continual improvement" was published. However, at present, risk management within a medical testing facility stresses the implementation of provisional actions in response to a problem after it has occurred. Risk management is basically a planned process and includes "corrective actions" as well as "preventive actions." A corrective action is defined as identifying the root cause of the problem and removing it, and is conducted to prevent the problem from recurring. A preventive action is defined as identifying of the any potential problem and removing it, and is conducted to prevent a problem before it occurs. Presently, I shall report on the experiences of our laboratory regarding corrective and preventive actions taken in response to accidents and incidents, respectively.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
...-0019; Amdt. No. 1-67] RIN 2120- AK03 Removal of Category IIIa, IIIb, and IIIc Definitions; Confirmation... remove the definitions of Category IIIa, IIIb, and IIIc operations because the definitions are outdated..., entitled ``Removal of Category IIIa, IIIb, and IIIc Definitions'' (77 FR 9163). The direct final rule...
This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...
Talvitie, Julia; Mikola, Anna; Koistinen, Arto; Setälä, Outi
2017-10-15
Conventional wastewater treatment with primary and secondary treatment processes efficiently remove microplastics (MPs) from the wastewater. Despite the efficient removal, final effluents can act as entrance route of MPs, given the large volumes constantly discharged into the aquatic environments. This study investigated the removal of MPs from effluent in four different municipal wastewater treatment plants utilizing different advanced final-stage treatment technologies. The study included membrane bioreactor treating primary effluent and different tertiary treatment technologies (discfilter, rapid sand filtration and dissolved air flotation) treating secondary effluent. The MBR removed 99.9% of MPs during the treatment (from 6.9 to 0.005 MP L -1 ), rapid sand filter 97% (from 0.7 to 0.02 MP L -1 ), dissolved air flotation 95% (from 2.0 to 0.1 MP L -1 ) and discfilter 40-98.5% (from 0.5 - 2.0 to 0.03-0.3 MP L -1 ) of the MPs during the treatment. Our study shows that with advanced final-stage wastewater treatment technologies WWTPs can substantially reduce the MP pollution discharged from wastewater treatment plants into the aquatic environments. Copyright © 2017 Elsevier Ltd. All rights reserved.
Lessons Learned from the Space Shuttle Engine Cutoff System (ECO) Anomalies
NASA Technical Reports Server (NTRS)
Martinez, Hugo E.; Welzyn, Ken
2011-01-01
The Space Shuttle Orbiter's main engine cutoff (ECO) system first failed ground checkout in April, 2005 during a first tanking test prior to Return-to-Flight. Despite significant troubleshooting and investigative efforts that followed, the root cause could not be found and intermittent anomalies continued to plague the Program. By implementing hardware upgrades, enhancing monitoring capability, and relaxing the launch rules, the Shuttle fleet was allowed to continue flying in spite of these unexplained failures. Root cause was finally determined following the launch attempts of STS-122 in December, 2007 when the anomalies repeated, which allowed drag-on instrumentation to pinpoint the fault (the ET feedthrough connector). The suspect hardware was removed and provided additional evidence towards root cause determination. Corrective action was implemented and the system has performed successfully since then. This white paper presents the lessons learned from the entire experience, beginning with the anomalies since Return-to-Flight through discovery and correction of the problem. To put these lessons in better perspective for the reader, an overview of the ECO system is presented first. Next, a chronological account of the failures and associated investigation activities is discussed. Root cause and corrective action are summarized, followed by the lessons learned.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-18
... actions at the Site included excavation of contaminated soils, backfilling with clean soils, and re-grading and disposal of the contaminated soils. The removal action was completed in December of 2010. MTMI...
Anfruns-Estrada, Eduard; Bruguera-Casamada, Carmina; Salvadó, Humbert; Brillas, Enric; Sirés, Ignasi; Araujo, Rosa M
2017-12-01
This work aims at comparing the ability of two kinds of electrochemical technologies, namely electrocoagulation (EC) and electro-Fenton (EF), to disinfect primary and secondary effluents from municipal wastewater treatment plants. Heterotrophic bacteria, Escherichia coli, enterococci, Clostridium perfringens spores, somatic coliphages and eukaryotes (amoebae, flagellates, ciliates and metazoa) were tested as indicator microorganisms. EC with an Fe/Fe cell at 200 A m -2 and natural pH allowed >5 log unit removal of E. coli and final concentration below 1 bacteria mL -1 of coliphages and eukaryotes from both effluents in ca. 60 min, whereas heterotrophic bacteria, enterococci and spores were more resistant. A larger removal was obtained for the primary effluent, probably because the flocs remove higher amount of total organic carbon (TOC), entrapping more easily the microbiota. EF with a boron-doped diamond (BDD) anode and an air-diffusion cathode that produces H 2 O 2 on site was first performed at pH 3.0, with large or even total inactivation of microorganisms within 30 min. A more effective microorganism removal was attained as compared to EC thanks to • OH formed from Fenton's reaction. A quicker disinfection was observed for the secondary effluent owing to its lower TOC content, allowing the attack of greater quantities of electrogenerated oxidants on microorganisms. Wastewater disinfection by EF was also feasible at natural pH (∼7), showing similar abatement of active microorganisms as a result of the synergistic action of generated oxidants like active chlorine and coagulation with iron hydroxides. A sequential EC/EF treatment (30 min each) was more effective for a combined decontamination and disinfection of urban wastewater. Copyright © 2017 Elsevier Ltd. All rights reserved.
Bączyk, Anna; Wagner, Maciej; Okruszko, Tomasz; Grygoruk, Mateusz
2018-06-15
Intensification of agriculture and ongoing urban sprawl exacerbate pressures on rivers. Small rivers in agricultural landscapes are especially exposed to excessive technical actions implemented in order to allow for harvesting river water for irrigation, draining agricultural water and receiving sewage. Regular dredging and macrophyte removal strongly interfere with the global need for preserving river biodiversity that allows agricultural lowland rivers to remain refuges for a variety of species, and-accordingly-to keep water bodies resilient for the benefit of society. In order to provide a comprehensive look at the influence of agricultural lowland river management on the ecological status of these water bodies, we conducted a literature review and a meta-analysis. For the structured literature review we selected 203 papers reflecting on the response of aquatic ecosystems to dredging and macrophyte management actions. The database of scientific contributions developed for our study consists of papers written by the authors from 33 countries (first authorship) addressing dredging, macrophyte removal, status of fish and macroinvertebrates as well as the general ecological status of lowland agricultural rivers. We revealed that 96% of the analyzed papers indicated unilateral, negative responses of aquatic ecosystems, particularly macroinvertebrates, ichthyofauna and macrophyte composition, to maintenance measures. We revealed that studies conducted in the European Union on the ecological status of rivers appeared to significantly increase in quantity after the implementation of the Water Framework Directive. Finally, we concluded that day-to-day management of lowland agricultural rivers requires revision in terms of compliance with environmental conservation requirements and the recurrent implementation of technical measures for river maintenance. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wichner, R.P.; Hodge, S.A.; Weber, C.F.
1984-08-01
This report presents an analysis of the movement of noble gas, iodine, and cesium fission products within the Mark-I containment BWR reactor system represented by Browns Ferry Unit 1 during a postulated accident sequence initiated by a loss of decay heat removal capability following a scram. The event analysis showed that this accident could be brought under control by various means, but the sequence with no operator action ultimately leads to containment (drywell) failure followed by loss of water from the reactor vessel, core degradation due to overheating, and reactor vessel failure with attendant movement of core debris onto themore » drywell floor. The analysis of fission product transport presented in this report is based on the no-operator-action sequence and provides an estimate of fission product inventories, as a function of time, within 14 control volumes outside the core, with the atmosphere considered as the final control volume in the transport sequence. As in the case of accident sequences previously studied, we find small barrier for noble gas ejection to air, these gases being effectively purged from the drywell and reactor building by steam and concrete degradation gases. However, significant decay of krypton isotopes occurs during the long delay times involved in this sequence. In contrast, large degrees of holdup for iodine and cesium are projected due to the chemical reactivity of these elements. Only about 2 x 10/sup -4/% of the initial iodine and cesium activity are predicted to be released to the atmosphere. Principal barriers for release are deposition on reactor vessel and containment walls. A significant amount of iodine is captured in the water pool formed in the reactor building basement after actuation of the fire protection system.« less
75 FR 78340 - Notice of Final Federal Agency Actions on Proposed Highway in Nevada
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to I-15 Corridor... NEON, in Clark County in the State of Nevada. Those actions grant licenses, permits, and approvals for...; telephone: (775) 888-7686; e-mail: [email protected]state.nv.us . The NDOT office's regular business hours are 8 a...
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh.
This affirmative action (AA) guide is intended to identify and remove discriminatory employment practices that may still exist in the North Carolina State Department of Public Instruction (DPI). DPI extends equal employment opportunity (EEO) to all applicants and employees without regard to race, color, religion, sex, age, handicap, political…
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Coverage. 432.102 Section 432.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE BASED REDUCTION IN GRADE AND REMOVAL ACTIONS § 432.102 Coverage. (a) Actions covered. This part covers reduction in grade...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Coverage. 432.102 Section 432.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE BASED REDUCTION IN GRADE AND REMOVAL ACTIONS § 432.102 Coverage. (a) Actions covered. This part covers reduction in grade...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Coverage. 432.102 Section 432.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE BASED REDUCTION IN GRADE AND REMOVAL ACTIONS § 432.102 Coverage. (a) Actions covered. This part covers reduction in grade...
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
... which such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the project, both approved on May 26, 2011. The FEA can be viewed...
Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less
77 FR 29579 - Removing Unnecessary Office on Violence Against Women Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Office on Violence Against Women Regulations AGENCY: Office on Violence Against Women, Justice. ACTION: Proposed rule. SUMMARY: This rule proposes to remove the regulations for the STOP Violence Against Indian... through regular or express mail, they should be sent to Kathi Grasso, Office on Violence Against Women...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2012 CFR
2012-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2014 CFR
2014-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2013 CFR
2013-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
DOT National Transportation Integrated Search
2017-11-01
Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders...
The challenge of carbon dioxide removal for EU policy-making
NASA Astrophysics Data System (ADS)
Scott, Vivian; Geden, Oliver
2018-05-01
Most scenarios to meet the Paris Agreement require negative emissions technologies. The EU has assumed a global leadership role in mitigation action and low-carbon energy technology development and deployment, but carbon dioxide removal presents a serious challenge to its low-carbon policy paradigm and experience.
48 CFR 1322.101-4 - Removal of items from contractors' facilities affected by work stoppages.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Removal of items from... Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT... legal advice before initiating any action in accordance with FAR 22.101-4. ...
40 CFR 300.420 - Remedial site evaluation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... section is to describe the methods, procedures, and criteria the lead agency shall use to collect data, as...) Remedial preliminary assessment. (1) The lead agency shall perform a remedial PA on all sites in CERCLIS as... indicates that a removal action may be warranted, the lead agency shall initiate removal evaluation pursuant...
40 CFR 300.420 - Remedial site evaluation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... section is to describe the methods, procedures, and criteria the lead agency shall use to collect data, as...) Remedial preliminary assessment. (1) The lead agency shall perform a remedial PA on all sites in CERCLIS as... indicates that a removal action may be warranted, the lead agency shall initiate removal evaluation pursuant...
25 CFR 16.6 - Authority of attorneys in State court litigation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... or decision against exercise of a preferential right to purchase property subject to sale, the removal or decision against removal of actions to Federal courts, and the waiver or decision against... his official capacity as counsel therein, including but not limited to the filing or decision against...
DOT National Transportation Integrated Search
2017-11-01
Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders...
12 CFR 19.245 - Notice of removal, suspension or debarment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services... final order for removal, suspension, or debarment of an independent public accountant or accounting firm... notice of the order to the other Federal banking agencies. (b) Notice to the Comptroller by accountants...
12 CFR 19.245 - Notice of removal, suspension or debarment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services... final order for removal, suspension, or debarment of an independent public accountant or accounting firm... notice of the order to the other Federal banking agencies. (b) Notice to the Comptroller by accountants...
12 CFR 19.245 - Notice of removal, suspension or debarment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services... final order for removal, suspension, or debarment of an independent public accountant or accounting firm... notice of the order to the other Federal banking agencies. (b) Notice to the Comptroller by accountants...
12 CFR 263.403 - Automatic removal, suspension, and debarment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Removal, Suspension, and Debarment of Accountants... independent public accountant or accounting firm may not perform audit services for banking organizations if the accountant or firm: (1) Is subject to a final order of removal, suspension, or debarment (other...
12 CFR 19.245 - Notice of removal, suspension or debarment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing Audit Services... final order for removal, suspension, or debarment of an independent public accountant or accounting firm... notice of the order to the other Federal banking agencies. (b) Notice to the Comptroller by accountants...
Oliveira, Maria Sonia; Borges, Alvaro Henrique; Mattos, Fernanda Zanol; Semenoff, Tereza Aparecida Della Vedove; Segundo, Alex Semenoff; Tonetto, Mateus Rodrigues; Bandeca, Matheus Coêlho; Porto, Alessandra Nogueira
2014-01-01
Background: The present study aimed to evaluate the different methods for removing oral biofilm in combination with 0.12% chlorhexidine, in patients admitted to the intensive care unit (ICU) of the General University Hospital. Materials and Methods: Initially, the patients were included in the study and underwent periodontal evaluation by means of the visible plaque index (VPI) and gingival bleeding index (GBI). The removal of visible biofilm, by a professional, was carried out using a toothbrush and dental floss, followed by the application of a 0.12% chlorhexidine solution. The patients were included in this randomized and controlled study into four groups (total n = 48), as follows: Chlorhexidine and gauze 12/12 h; chlorhexidine and gauze 24/24 h; chlorhexidine and brushing 12/12 h; chlorhexidine and brushing 24/24 h. The patients underwent the biofilm removal protocol for 7 days and then were subjected to a new clinical evaluation as to VPI and GBI. Data analysis was performed through stratification and arrangement of the records, in order to carry out the associations with health indicators used in the study, and the statistical tests used were Kappa and t-test for independent and paired samples. Results: A decrease in the VPI and GBI values when comparing baseline to the final evaluation for all groups was observed. Conclusion: Based on the methodology, it was possible to concluded that chlorhexidine associated with the mechanical action of the toothbrush or gauze in the times 12 h and 24 h in the ICU environment presented the same results as regards amount of visible biofilm. How to cite the article: Oliveira MS, Borges AH, Mattos FZ, Semenoff TA, Segundo AS, Tonetto MR, Bandeca MC, Porto AN. Evaluation of different methods for removing oral biofilm in patients admitted to the intensive care unit. J Int Oral Health 2014;6(3):61-4. PMID:25083034
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dowell, Jonathan; Franco, Joe
The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permittedmore » low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)« less
78 FR 52718 - Proposed Revocation of Class E Airspace; Danville, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-26
...: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: This action proposes to remove Class E airspace at Danville, IL. The FAA has determined that, because of... particularly helpful in developing reasoned regulatory decisions on the proposal. Comments are specifically...
76 FR 19719 - Airworthiness Directives; Saab AB, Saab Aerosystems Model SAAB 2000 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... fretting corrosion; a detailed inspection of the actuator mounting bracket and shock struts for damage, cracks, and signs of corrosion; and doing corrective actions if necessary. Corrective actions include removing corrosion, replacing affected bolts with new bolts, tightening loose nuts, repairing, and...
IS REMOVAL THE ONLY OPTION: IN SITU REMEDIATION OF METAL CONTAMINATED SOILS
The In-place Inactivation and Natural Ecological Restoration Technologies (IINERT) Soil-Metals Action Team was established in 11/95 as one of several Action Teams under the USEPA Remediation Technologies Development Forum (RTDF). Its primary goal was to examine in situ remediatio...
12 CFR 308.604 - Notice of removal, suspension, or debarment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... issuance of a final order for removal, suspension, or debarment of an independent public accountant or..., whichever date is earlier. The written notice must be filed by the independent public accountant or... PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing...
12 CFR 308.604 - Notice of removal, suspension, or debarment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing... issuance of a final order for removal, suspension, or debarment of an independent public accountant or... notice of the order to the other Federal banking agencies. (b) Notice to the FDIC by accountants and...
12 CFR 263.403 - Automatic removal, suspension, and debarment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Accountants From Performing Audit Services § 263.403 Automatic removal, suspension, and debarment. (a) An independent public accountant or accounting firm may not perform audit services for banking organizations if the accountant or firm: (1) Is subject to a final order of removal, suspension, or debarment (other...
12 CFR 263.403 - Automatic removal, suspension, and debarment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Accountants From Performing Audit Services § 263.403 Automatic removal, suspension, and debarment. (a) An independent public accountant or accounting firm may not perform audit services for banking organizations if the accountant or firm: (1) Is subject to a final order of removal, suspension, or debarment (other...
12 CFR 308.604 - Notice of removal, suspension, or debarment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing... issuance of a final order for removal, suspension, or debarment of an independent public accountant or... notice of the order to the other Federal banking agencies. (b) Notice to the FDIC by accountants and...
12 CFR 308.604 - Notice of removal, suspension, or debarment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing... issuance of a final order for removal, suspension, or debarment of an independent public accountant or... notice of the order to the other Federal banking agencies. (b) Notice to the FDIC by accountants and...
12 CFR 308.604 - Notice of removal, suspension, or debarment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PRACTICE RULES OF PRACTICE AND PROCEDURE Removal, Suspension, and Debarment of Accountants From Performing... issuance of a final order for removal, suspension, or debarment of an independent public accountant or... notice of the order to the other Federal banking agencies. (b) Notice to the FDIC by accountants and...
12 CFR 263.403 - Automatic removal, suspension, and debarment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Accountants From Performing Audit Services § 263.403 Automatic removal, suspension, and debarment. (a) An independent public accountant or accounting firm may not perform audit services for banking organizations if the accountant or firm: (1) Is subject to a final order of removal, suspension, or debarment (other...
Ultrasound-assisted oxidative desulfurization of bitumen
NASA Astrophysics Data System (ADS)
Kamal, Wan Mohamad Ikhwan bin Wan; Okawa, Hirokazu; Kato, Takahiro; Sugawara, Katsuyasu
2017-07-01
Bitumen contains a high percentage of sulfur (about 4.6 wt %). A hydrodesulfurization method is used to remove sulfur from bitumen. The drawback of this method is the requirement for a high temperature of >300 °C. Most of the sulfur in bitumen exists as thiophene. Oxidative desulfurization (ODS), involving oxidizing sulfur using H2O2, then removing it using NaOH, allows the removal of sulfur in thiophene at low temperatures. We removed sulfur from bitumen using ODS treatment under ultrasound irradiation, and 52% of sulfur was successfully removed. Additionally, the physical action of ultrasound assisted the desulfurization of bitumen, even at low H2O2 concentrations.
Removal of toxic metals and nonmetals from contaminated water.
Bartzatt, R; Cano, M; Johnson, L; Nagel, D
1992-04-01
The effects of the application of potassium ferrate to remove possible toxic compounds are presented. Potassium ferrate (K2FeO4) is shown in this work to be an effective means to remove toxic metals and nonmetals from aqueous solution. The toxic material present in water is precipitated from aqueous solution and readily removed. Potassium ferrate removes itself from solution. Discolored contaminated water may be made clear by utilizing potassium ferrate. In addition, turbidities of solutions induced by dissolved substances are eliminated by the action of potassium ferrate. The efficacy of potassium ferrate in cleaning contaminated water shows great potential in application to municipal and industrial waste water.
40 CFR 265.19 - Construction quality assurance program.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...
40 CFR 265.19 - Construction quality assurance program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...
40 CFR 265.19 - Construction quality assurance program.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...
100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
HARRINGTON RA
2010-01-15
On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, tomore » all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
Establishing Final Cleanup Decisions for the Hanford Site River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Sands, J.P.
2007-07-01
A major challenge in the River Corridor Closure Contract is establishing final cleanup decisions for the source operable units in the Hanford Site river corridor. Cleanup actions in the river corridor began in 1994 and have been performed in accordance with a 'bias for action' approach adopted by the Tri-Parties - the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology. This approach enabled early application of cleanup dollars on actual remediation of contaminated waste sites. Consequently, the regulatory framework authorizing cleanup actions at source operable units in the river corridor consists largely of interimmore » action records of decision, which were supported by qualitative risk assessments. Obtaining final cleanup decisions for the source operable units is necessary to determine whether past cleanup actions in the river corridor are protective of human health and the environment and to identify any course corrections that may be needed to ensure that ongoing and future cleanup actions are protective. Because the cleanup actions are ongoing, it is desirable to establish the final cleanup decisions as early as possible to minimize the impacts of any identified course corrections to the present cleanup approach. Development of a strategy to obtain final cleanup decisions for the source operable units in a manner that is responsive to desires for an integrated approach with the groundwater and Columbia River components while maintaining the ability to evaluate each component on its own merit represents a significant challenge. There are many different options for grouping final cleanup decisions, and each involved party or stakeholder brings slightly different interests that shape the approach. Regardless of the selected approach, there are several specific challenges and issues to be addressed before making final cleanup decisions. A multi-agency and contractor working group has been established to address these issues and develop an endorsed strategy. Ultimately, it is anticipated that the Tri-Parties will establish a set of milestones to document pathway selection and define schedule requirements. (authors)« less
77 FR 40812 - Dicloran and Formetanate; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... Dicloran and Formetanate; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final... I.C. of the SUPPLEMENTARY INFORMATION). ADDRESSES: The docket for this action, identified by [email protected] . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may...
Allen, Brady; Engle, Rod O; Zendt, Joseph S; Shrier, Frank C; Wilson, Jeremy T; Connolly, Patrick J.
2016-01-01
Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and completely removed in 2012. This action opened habitat to migratory fish for the first time in 100 years. The White Salmon Working Group was formed to create plans for fish salvage in preparation for fish recolonization and to prescribe the actions necessary to restore anadromous salmonid populations in the White Salmon River after Condit Dam removal. Studies conducted by work group members and others served to inform management decisions. Management options for individual species were considered, including natural recolonization, introduction of a neighboring stock, hatchery supplementation, and monitoring natural recolonization for some time period to assess the need for hatchery supplementation. Monitoring to date indicates that multiple species and stocks of anadromous salmonids are finding and spawning in the now accessible and recovering habitat.
Congress’s Contempt Power: Law, History, Practice, and Procedure
2007-07-24
obstruction (civil contempt). Although arguably any action that directly obstructs the effort of Congress to exercise its constitutional powers may constitute...remove the obstruction.1 Although arguably any action that directly obstructs the effort of Congress to exercise its constitutional powers may...resolution ordering their arrest and detention by the Sergeant-at-Arms, pending further action by the House.23 The matter was then referred to a
Code of Federal Regulations, 2014 CFR
2014-04-01
... action removing an Indian child from his or her parent or Indian custodian for temporary placement in a...) Termination of parental rights, which shall mean any action resulting in the termination of the parent-child... parent of such child. Indian organization, solely for purposes of eligibility for grants under subpart D...
Code of Federal Regulations, 2010 CFR
2010-04-01
... action removing an Indian child from his or her parent or Indian custodian for temporary placement in a...) Termination of parental rights, which shall mean any action resulting in the termination of the parent-child... parent of such child. Indian organization, solely for purposes of eligibility for grants under subpart D...
Code of Federal Regulations, 2013 CFR
2013-04-01
... action removing an Indian child from his or her parent or Indian custodian for temporary placement in a...) Termination of parental rights, which shall mean any action resulting in the termination of the parent-child... parent of such child. Indian organization, solely for purposes of eligibility for grants under subpart D...
Code of Federal Regulations, 2011 CFR
2011-04-01
... action removing an Indian child from his or her parent or Indian custodian for temporary placement in a...) Termination of parental rights, which shall mean any action resulting in the termination of the parent-child... parent of such child. Indian organization, solely for purposes of eligibility for grants under subpart D...
Code of Federal Regulations, 2012 CFR
2012-04-01
... action removing an Indian child from his or her parent or Indian custodian for temporary placement in a...) Termination of parental rights, which shall mean any action resulting in the termination of the parent-child... parent of such child. Indian organization, solely for purposes of eligibility for grants under subpart D...
Code of Federal Regulations, 2011 CFR
2011-01-01
...) A reduction in grade or removal under 5 U.S.C. 4303; (5) An action against an administrative law... other provision of law which excepts the action from subchapter II of chapter 75 of title 5, United... law or regulation, including a reduction necessary to comply with the amendments made by Public Law...
Analyzing Student-Level Disciplinary Data: A Guide for Districts. REL 2017-263
ERIC Educational Resources Information Center
Petrosino, Anthony; Fronius, Trevor; Goold, Cailean C.; Losen, Daniel J.; Turner, Herbert M.
2017-01-01
Discipline in schools can be categorized as exclusionary actions, which remove students from their normal learning setting (for example, out-of-school suspension), or inclusionary actions, which do not (for example, afterschool detention). The relationship of exclusionary discipline to negative outcomes for students, particularly racial/ethnic…
76 FR 41665 - Airworthiness Directives; Saab AB, Saab Aerosystems Model SAAB 2000 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... a detailed inspection of the bolts for uniform or fretting corrosion; a detailed inspection of the actuator mounting bracket and shock struts for damage, cracks, and signs of corrosion; and doing corrective actions if necessary. Corrective actions include removing corrosion, replacing affected bolts with new...
Code of Federal Regulations, 2014 CFR
2014-01-01
... temporary appointment limited to 1 year or less; (3) An employee in the excepted service who is a preference... to the following actions: (1) Removals; (2) Suspensions for more than 14 days, including indefinite suspensions; (3) Reductions in grade; (4) Reductions in pay; and (5) Furloughs of 30 days or less. (b) Actions...
NASA Astrophysics Data System (ADS)
Garattini, Remo
2013-09-01
The one loop effective action in a Schwarzschild background is here used to compute the Zero Point Energy (ZPE) which is compared to the same one generated by an existing gravastar. We find that only when we set up a difference between ZPE in these different background we can have an indication on which configuration is favored. Such a ZPE difference represents the Casimir energy. Such an energy, being negative, can be considered as a part of the Dark Energy necessary for the topology change. It is also shown that the expression of the ZPE is equivalent to the one computed by means of a variational approach. To handle with ZPE divergences, we use the zeta function regularization. A renormalization procedure to remove the infinities together with a renormalization group equation is introduced. We find that the final configuration is dependent on the ratio between the radius of the wormhole augmented by the "brick wall" and the radius of the gravastar.
Dana, M N; Ascher, P D
1986-01-01
A previously identified S-linked stylar-inactivation PSC factor (Flaschenriem and Ascher 1979b) was studied for its location relative to S. Plants exhibiting complete stylar-inactivation PSC were those with higher multigenic PSC background level than plants with only S-linked partial stylar-inactivation PSC. A pollen-mediated pseudo-self compatibility (PMPSC) adjustment factor was offered as a device to focus on stylar-inactivation PSC by removing some male origin, multigenic PSC. The stylar inactivation factor was not tightly linked to S but affected expression of only the allele to which it was linked. A three part interacting association of genetic material governing self incompatibility (SI) is proposed. The parts of S are the SI identity gene, S-specific PSC genes and, finally, PSC genes which are not S-specific in action. The complete association is termed the SI-complex.
78 FR 2331 - Airworthiness Directives; Pratt & Whitney Canada Corp. Turboprop Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
... inspections of certain serial numbers (S/Ns) of propeller shafts for cracks and removal from service if found cracked. This new AD requires the same actions, but requires removal from service of affected propeller... two propeller shafts found cracked at time of inspection during maintenance. We are issuing this AD to...
42 CFR 24.9 - Removal from the Service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Removal from the Service. 24.9 Section 24.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL SENIOR BIOMEDICAL... action both orally and in writing; (3) The right to be represented by an attorney or other representative...
42 CFR 24.9 - Removal from the Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Removal from the Service. 24.9 Section 24.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL SENIOR BIOMEDICAL... action both orally and in writing; (3) The right to be represented by an attorney or other representative...
75 FR 59078 - Safety Zone; Ledge Removal Project, Bass Harbor, ME
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-27
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0806] RIN 1625-AA00 Safety Zone; Ledge Removal Project, Bass Harbor, ME AGENCY: Coast Guard, DHS. ACTION: Temporary... District USACE Web site: http://www.nae.usace.army.mil/projects/me/bassharbor/bassharbor.htm . No...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2012 CFR
2012-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2014 CFR
2014-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2013 CFR
2013-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
... Promulgation of Air Quality Implementation Plans; Maryland; Removal of the 1980 Consent Order for the Maryland Slag Company AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA... issued to the Maryland Slag Company (now known as MultServ). The 1980 Consent Order is no longer required...
2012-09-01
deportees and coordinated initiatives to “encourage uncooperative countries to accept [the return of] their nationals.” These action items have been...United States and Canada of the reciprocal agreement between those countries for the exchange of deportees , and expansion of joint removal operations
75 FR 24862 - Removing Regulations Implementing the Fish and Wildlife Conservation Act
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 83 [Docket No. FWS-R9-WSR-2010... and Wildlife Conservation Act AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), propose to remove our regulations implementing...
36 CFR 222.61 - Administration of wild free-roaming horses and burros and their environment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... permits for maintenance of these animals to individuals and organizations; (3) Establish wild horse and... burros on each territory to determine whether and where excess animals exists; (6) Based on paragraphs (a... to remove excess animals and what actions are appropriate to achieve the removal or destruction of...
36 CFR 222.21 - Administration of wild free-roaming horses and burros and their environment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... permits for maintenance of these animals to individuals and organizations; (3) Establish wild horse and... burros on each territory to determine whether and where excess animals exists; (6) Based on paragraphs (a... to remove excess animals and what actions are appropriate to achieve the removal or destruction of...
36 CFR 222.21 - Administration of wild free-roaming horses and burros and their environment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... permits for maintenance of these animals to individuals and organizations; (3) Establish wild horse and... burros on each territory to determine whether and where excess animals exists; (6) Based on paragraphs (a... to remove excess animals and what actions are appropriate to achieve the removal or destruction of...
36 CFR 222.61 - Administration of wild free-roaming horses and burros and their environment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... permits for maintenance of these animals to individuals and organizations; (3) Establish wild horse and... burros on each territory to determine whether and where excess animals exists; (6) Based on paragraphs (a... to remove excess animals and what actions are appropriate to achieve the removal or destruction of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conway, R.; Wade, M.; Tharp, T.
1994-12-31
The first remediation of an Environmental Restoration (ER) Project site at Sandia National Laboratories (SNL) was successfully conducted in May and June 1994 at Technical Area II. The removal action involved four Uranium Calibration Pits (UCPs) filled with radioactive or hazardous materials. The concrete culvert pits were used to test and calibrate borehole radiometric logging tools for uranium exploration. The removal action consisted of excavating and containerizing the pit contents and contaminated soil beneath the culverts, removing the four culverts, and backfilling the excavation. Each UCP removal had unique complexities. Sixty 208-L drums of solid radioactive waste and eight 208-Lmore » drums of liquid hazardous waste were generated during the VCM. Two of the concrete culverts will be disposed as radioactive waste and two as solid waste. Uranium-238 was detected in UCP-2 ore material at 746 pci/g, and at 59 pci/g in UCP-1 silica sand. UCP-4 was empty; sludge from UCP-3 contained 122 mg/L (ppm) chromium.« less
NASA Astrophysics Data System (ADS)
Sysoev, N. I.; Turuk, Yu V.; Kolesnichenko, I. Y.; Lugantsev, B. B.
2017-10-01
The reasons for the failure of the pitch stability of the knife-plane installation due to the action of extreme effort in the plane of the seam from the conveyor side on the mechanism of removing sections of mechanized sets are shown. The technique for determining this effort is presented. The constructions of the adaptive mechanisms of the removing sections of mechanized sets with the basements of catamaran type, in the constrictions of which elastic elements (rods) are used, are considered. The constructions of the mechanism of removing a section of the mechanized set with the basement of catamaran type in which the stock of the hydraulic jack is connected with the band loop through the movable rods intermediate basement with a link are worked out. The intermediate basement unloads the stock of the hydraulic jack of the moving installation from the side curving efforts, caused by the action of lateral forces in the plane of the seam on the conveyor side. It increases the reliability and efficiency of work of the knife plane mechanized complex.
Action against contraceptive implant threatened.
Dyer, C
1995-08-19
Norplant provides contraception over a five-year period through the gradual subcutaneous release of the progestogen levonorgestrel. It has been on the US market since 1991 and available in Great Britain since 1993. Already the subject of group legal actions in several US states, Norplant may soon be the target of lawyers in Britain for litigation. The lawyers allege that insertion of the implant under the skin of the upper arm by untrained doctors has led to painful and difficult removals and left women with scarred arms. Moreover, insufficient warning has been given about possible side effects such as mood swings and continuous vaginal bleeding. Hoechst Roussel, marketer of the implant in Britain, however, argues that only doctors trained in Norplant insertion and removal should attempt either procedure. Removal will be problematic only if preceded by a problem insertion. Hoechst Roussel recently advised gynecologists, in writing, not to attempt to extract the implant unless they are trained in the removal technique. By British law, the application of a drug product once approved for general release to general practitioners and family planning doctors cannot be restricted by a pharmaceutical company.
75 FR 43 - Modification of Class E Airspace; Beckley, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... and management of the aircraft operations at Raleigh County Memorial Airport. DATES: Effective 0901... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that...
75 FR 43 - Modification of Class E Airspace; Sarasota, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that... increases the safety and management of the aircraft operations at Sarasota/Bradenton International Airport...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
76 FR 40811 - Maneb; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
...; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is... established a docket for this action under docket identification (ID) number EPA-HQ-OPP-2010-0327. All... . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may be potentially...
77 FR 47513 - Definition of Enforcement Action
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... Enforcement Action AGENCY: National Indian Gaming Commission, Interior. ACTION: Final rule. SUMMARY: The... to add a definition of ``enforcement action.'' DATES: Effective Date: September 10, 2012. FOR FURTHER... that to supplement the amendments made to Part 573, a definition of ``enforcement action'' needed to be...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... complete the removal of all invasive animal species. We will also develop and implement a plan for..., if necessary, efforts to remove invasive species. The number of vegetation plots and frequency of... safety of the refuge regarding the removal of unexploded ordnance. CCP Alternatives, Including Our...
This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project following one year of operation at the Climax, Minnesota, site. The objectives of the project were to evaluate: (1) the effectiveness of Kin...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...
Yang, Zhiquan; Zhou, Shaoqi; Sun, Yanbo
2009-09-30
A laboratory testing of simultaneous removal of ammonium and sulfate (SRAS) was studied from an anammox process in an anaerobic bioreactor filled with granular activated carbon. Two different phases of experiment were investigated to start up the SRAS process, and final batch tests were performed to analyze the SRAS process. The experiment included an anammox process and an SRAS process. During the anammox process, the highest removal efficiency of ammonium and nitrite was up to 97 and 98%, respectively. After 160 days in the stationary phase of anammox process, the ratio of ammonium to nitrite consumption was approximately 1:1.15, which is much higher than 1:1.32 in the traditional anammox process. The extra electron acceptor, such as sulfate, was thought to react with ammonium by bacteria. Synthetic wastewater containing ammonium chlorine and sodium sulfate was used as the feed for the bioreactor in the second phase of experiment. During the SRAS process, the influent concentrations of ammonium and sulfate were controlled to be 50-60 and 210-240 mg L(-1) respectively. After start-up and acclimatization of this process for 60 days, the average effluent concentrations of ammonium and sulfate were 30 and 160 mg L(-1), respectively. The simultaneous ammonium and sulfate removal was detected in the reactor. In order to further validate the biochemical interaction between ammonium and sulfate, batch tests was carried out. Abiotic tests were carried out to demonstrate that the pure chemical action between ammonium and sulfate without microorganism was not possible. Biotic assays with different ammonium and sulfate concentrations were further investigated that high concentrations of ammonium and sulfate could promote simultaneous removal of ammonium and sulfate. And elemental sulfur and nitrogen gas as the products measured in the SRAS process helped to demonstrate the occurrence of new interaction between nitrogen and sulfur. The new process of SRAS in the inorganic condition, including simultaneous removal of ammonium and sulfate, and the appearance of elemental sulfur and nitrogen gas as the terminal products, widened the cycle approach between nitrogen and sulfur.
Chaos removal in R +q R2 gravity: The mixmaster model
NASA Astrophysics Data System (ADS)
Moriconi, Riccardo; Montani, Giovanni; Capozziello, Salvatore
2014-11-01
We study the asymptotic dynamics of the mixmaster universe, near the cosmological singularity, considering f (R ) gravity up to a quadratic correction in the Ricci scalar R . The analysis is performed in the scalar-tensor framework and adopting Misner-Chitré-like variables to describe the mixmaster universe, whose dynamics resembles asymptotically a billiard ball in a given domain of the half-Poincaré space. The form of the potential well depends on the spatial curvature of the model and on the particular form of the self-interacting scalar field potential. We demonstrate that the potential walls determine an open domain in the configuration region, allowing the point universe to reach the absolute of the considered Lobachevsky space. In other words, we outline the existence of a stable final Kasner regime in the mixmaster evolution, implying chaos removal near the cosmological singularity. The relevance of the present issue relies both on the general nature of the considered dynamics, allowing its direct extension to the Belinski-Khalatnikov-Lifshitz conjecture too, as well as the possibility to regard the considered modified theory of gravity as the first correction to the Einstein-Hilbert action as a Taylor expansion of a generic function f (R ) (as soon as a cutoff on the space-time curvature takes place).
Brunt, Kommer; Sanders, Peter; Spichtig, Véronique; Ernste-Nota, Veronica; Sawicka, Paulina; Iwanoff, Kimberley; Van Soest, Jeroen; Lin, Paul Kong Thoo; Austin, Sean
2017-05-01
Until recently, only two AOAC Official MethodsSM have been available for the analysis of fructans: Method 997.08 and Method 999.03. Both are based on the analysis of the fructan component monosaccharides (glucose and fructose) after hydrolysis. The two methods have some limitations due to the strategies used for removing background interferences (such as from sucrose, α-glucooligosaccharides, and free sugars). The method described in this paper has been developed to overcome those limitations. The method is largely based on Method 999.03 and uses combined enzymatic and SPE steps to remove the interfering components without impacting the final analytical result. The method has been validated in two laboratories on infant formula and adult nutritionals. Recoveries were in the range of 86-119%, with most being in the range of 91-104%. RSDr values were in the range of 0.7-2.6%, with one exception when the fructan concentration was close to the LOQ, resulting in an RSDr of 8.9%. The performance is generally within the requirements outlined in the AOAC Standard Method Performance Requirements (SMPR® 2014.002), which specifies recoveries in the range of 90-110% and RSDr values below 6%.
Huang, J. M.; Tanguy, J.; Yeh, J. Z.
1987-01-01
Modification of sodium channels by chloramine-T was examined in voltage clamped internally perfused crayfish and squid giant axons using the double sucrose gap and axial wire technique, respectively. Freshly prepared chloramine-T solution exerted two major actions on sodium channels: (a) an irreversible removal of the fast Na inactivation, and (b) a reversible block of the Na current. Both effects were observed when chloramine-T was applied internally or externally (5-10 mM) to axons. The first effect was studied in crayfish axons. We found that the removal of the fast Na inactivation did not depend on the states of the channel since the channel could be modified by chloramine-T at holding potential (from -80 to -100 mV) or at depolarized potential of -30 mV. After removal of fast Na inactivation, the slow inactivation mechanism was still present, and more channels could undergo slow inactivation. This result indicates that in crayfish axons the transition through the fast inactivated state is not a prerequisite for the slow inactivation to occur. During chloramine-T treatment, a distinct blocking phase occurred, which recovered upon washing out the drug. This second effect of chloramine-T was studied in detail in squid axons. After 24 h, chloramine-T solution lost its ability to remove fast inactivation but retained its blocking action. After removal of the fast Na inactivation, both fresh and aged chloramine-T solutions blocked the Na currents with a similar potency and in a voltage-dependent manner, being more pronounced at lower depolarizing potentials. A similar voltage-dependent block was observed with aged chloramine-T solution in an axon with intact inactivation. In contrast to the action of the fresh solution, the aged chloramine-T solution was found to accelerate the decay of Na currents.These results suggest that chloramine-T solution contains at least two active molecular forms that act at different sites in the Na channel. PMID:2444276
NASA Astrophysics Data System (ADS)
Koster, N. B.; Molkenboer, F. T.; van Veldhoven, E.; Oostrom, S.
2011-04-01
We report on our findings on EUVL reticle contamination removal, inspection and repair. We show that carbon contamination can be removed without damage to the reticle by our plasma process. Also organic particles, simulated by PSL spheres, can be removed from both the surface of the absorber as well as from the bottom of the trenches. The particles shrink in size during the plasma treatment until they are vanished. The determination of the necessary cleaning time for PSL spheres was conducted on Ru coated samples and the final experiment was performed on our dummy reticle. Finally we show that the Helium Ion Microscope in combination with a Gas Injection System is capable of depositing additional lines and squares on the reticle with sufficient resolution for pattern repair.
EPA is taking direct final action to approve a request from the state of North Carolina for the EPA to relax the Reid Vapor Pressure standard applicable to gasoline introduced into commerce in the summer time for Mecklenburg and Gaston counties.
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... suspend the payment of all or some of the civil penalty, conditioned on the violator's future compliance...
The EPA is taking final action to relax the federal volatility (RVP) standard applicable to gasoline supplied to the Birmingham area from 7.8 pounds per square inch (psi) to 9.0 psi during the summer ozone season.
76 FR 1999 - Establishment of Class E Airspace; Panguitch, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-12
... Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action will establish Class E... the safety and management of Instrument Flight Rules (IFR) operations at the airport. DATES: Effective... found merit in this comment, and will incorporate this change in the final rule. With the exception of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF MILITARY RECORDS OF THE COAST GUARD Judgment and Disposition § 52.64 Final action. (a) The Board.... 1552, as follows: (1) The Board may deny an application for the correction of military records. (2... for the correction of military records in any of the following categories: (i) An application to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... 2150-2162 and 2500-2690 MHz Bands AGENCY: Federal Communications Commission. ACTION: Final rule..., demonstrate substantial service by combining licenses. Finally, on its own motion, the Commission corrects a... actions clarify the requirements necessary for BRS and EBS licensees to demonstrate substantial service...
78 FR 48161 - Proposed Consent Decree, Clean Air Act Citizen Suit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... further alleged that EPA had failed to take final action on the attainment demonstration, contingency... a notice taking final action on the attainment demonstration, contingency measures, emission....gov . You may use the www.regulations.gov to submit or view public comments, access the index listing...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-01
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.
Ultraviolet (UV)-Curable Coatings for Department of Defense (DoD) Applications
2009-09-01
complete) Task II – Demonstration/Validation • Make final selection of coatings for dem/val (in-progress) • Conduct lab testing and optimization (in...away; target rating of 4B or 5B Strippability Chemical Strippers Removal of the coating to the substrate Dry Media (blasting) Removal of the coating...stakeholders and ESTCP • Selected vendors to conduct final reformulation and submit for testing to JTP at the CTIO • Purchase portable lamp system
Veterans’ Health Care: Limited Progress Made to Address Concerns That Led to High Risk Designation
2017-03-15
partially meet two of the five criteria GAO uses to assess removal from the High-Risk List ( leadership commitment and an action plan), but it has not met...the other three (agency capacity, monitoring efforts, and demonstrated progress). Specifically, VA officials have taken leadership actions such as...high-risk designation, additional actions are required of VA, including: (1) demonstrating stronger leadership support as it continues its
Mariano Lake Mine: Technical Reports
This Final Removal Site Evaluation describes the objectives, work performed, and results of a Removal Site Evaluation (RSE) at the Mariano Lake Mine, which was performed by ARCADIS U.S., Inc. on behalf of Chevron Environmental Management Company.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... FEDERAL HOUSING FINANCE AGENCY 12 CFR Parts 1267, 1269, and 1270 RIN 2590-AA40 Removal of... Housing Finance Agency. ACTION: Notice of proposed rulemaking; request for comment. SUMMARY: Section 939A... references or requirements. To implement this provision, the Federal Housing Finance Agency (FHFA) is...
75 FR 30746 - Proposed Revocation and Establishment of Class E Airspace; Northeast, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... Management System Office (see ADDRESSES section for address and phone number) between 9 a.m. and 5 p.m... Distribution System, which describes the application procedure. The Proposal This action proposes to amend.... * * * * * AAL AK E6 Barter Island, AK [Removed] * * * * * AAL AK E6 Mentasta Lake/Mountains Area, AK [Removed...
Code of Federal Regulations, 2011 CFR
2011-01-01
... accordance with 5 U.S.C. 3321(b); (2) The reduction in grade or removal of an employee in the competitive... grade or removal of an employee in the competitive service serving in an appointment that requires no... administrative law judge; (7) An action taken under 5 U.S.C. 7532 in the interest of national security; (8) An...
75 FR 32317 - Proposed Revocation of Colored Federal Airway G-4; AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
...-0453; Airspace Docket No. 10-AAL-14] Proposed Revocation of Colored Federal Airway G-4; AK AGENCY... action proposes to remove Colored Federal Airway Green 4 (G-4) from the National Airspace System (NAS) in...) part 71 by removing Colored Federal airway G-4 associated with the planned BTS NDB decommissioning near...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [Docket No. FWS-R3-ES-2010... Endangered and Threatened Wildlife AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule.... SUMMARY: We, the U.S. Fish and Wildlife Service (Service), propose to remove the Lake Erie Watersnake...
Microprocessor-Controlled Laser Balancing System
NASA Technical Reports Server (NTRS)
Demuth, R. S.
1985-01-01
Material removed by laser action as part tested for balance. Directed by microprocessor, laser fires appropriate amount of pulses in correct locations to remove necessary amount of material. Operator and microprocessor software interact through video screen and keypad; no programing skills or unprompted system-control decisions required. System provides complete and accurate balancing in single load-and-spinup cycle.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the grass and weeds, removal of wild growth and drift deposits, and repair of damage caused by erosion... out, or removed; (vii) No action is being taken, such as burning grass and weeds during inappropriate... such inspections. Measures will be taken by the Superintendent to promote the growth of grass on bank...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the grass and weeds, removal of wild growth and drift deposits, and repair of damage caused by erosion... out, or removed; (vii) No action is being taken, such as burning grass and weeds during inappropriate... such inspections. Measures will be taken by the Superintendent to promote the growth of grass on bank...
This report documents the activities performed and the results obtained from January 30, 2006 to April 29, 2007 at the U.S. Environmental Protection Agency (EPA) Arsenic Removal Technology Demonstration site in Sabin, MN. The main objective of the project was to evaluate the eff...
This report documents the activities performed and the results obtained from the one-year U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project was to evaluate the effectiveness ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
...- AK03 Removal of Category IIIa, IIIb, and IIIc Definitions; Confirmation of Effective Date and Response... received on that direct final rule. In that document, the FAA proposed to remove the definitions of Category IIIa, IIIb, and IIIc operations because the definitions are outdated and no longer used for...
This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Northeastern Elementary School in Fountain City, IN. The main objective of the project was to evaluate the effectiveness of US Water Sys...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-09
... Promulgation of Air Quality Implementation Plans; West Virginia; Removal of NOX SIP Call Rules AGENCY... Implementation Plan (SIP) revision submitted by the State of West Virginia that removes West Virginia's nitrogen oxides (NOx) SIP Call rules. In the Final Rules section of this Federal Register, EPA is approving the...
As part of the EPA Arsenic Removal Technology Demonstration Program, a 540-gal/min (gpm) ion exchange (IX) system proposed by Kinetico was selected for demonstration at Vale, OR to remove arsenic and nitrate from a groundwater supply to meet their respective maximum contaminant l...
Speckle evolution with multiple steps of least-squares phase removal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen Mingzhou; Dainty, Chris; Roux, Filippus S.
2011-08-15
We study numerically the evolution of speckle fields due to the annihilation of optical vortices after the least-squares phase has been removed. A process with multiple steps of least-squares phase removal is carried out to minimize both vortex density and scintillation index. Statistical results show that almost all the optical vortices can be removed from a speckle field, which finally decays into a quasiplane wave after such an iterative process.
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
75 FR 58016 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No... project records. The FEA, and other project records are available by contacting the California Department of Transportation at the address provided above. The FEA can be viewed and downloaded from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l... Conservation and Management Act of 1976, as amended [16 U.S.C. 1801 et seq.]; Bald and Golden Eagle Protection...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Department of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is taking final action to approve North Dakota Department of Agriculture's... Department of Agriculture (iv) The initials RMP mean Risk Management Plan (v) The initials CFR mean Code of...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...