Sample records for final report contract

  1. 48 CFR 1552.211-77 - Final reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reports. As prescribed in 1511.011-77, insert this contract clause when a contract requires both a draft and a final report. FINAL REPORTS (SEP 2013) (a) “Draft Report”__The Contractor shall submit to the Contracting Officer's Representative __ copies of the draft final report on or before ___ (date) __ The...

  2. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  3. Final Report on the Audit of Architect-Engineer Contracting at the Officer in Charge of Construction, Naval Facilities Engineering Command Contracts, Mediterranean, Madrid, Spain

    DTIC Science & Technology

    1990-11-30

    This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include

  4. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    DTIC Science & Technology

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  5. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  6. Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

  7. 34 CFR 5.72 - Records available.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department or not. (c) Contracts. (1) Contract instruments. (2) Portions of offers reflecting final prices submitted in negotiated procurements. (d) Reports on grantee, contractor, or provider performance. Final... projects, such as films, computer software, other copyrightable materials and reports of inventions, will...

  8. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  9. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  10. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  11. Report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division, Europe

    DTIC Science & Technology

    1991-02-13

    This is our final report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division1 Europe, for your information and use...our ongoing audit of architect-engineer contracting. The Contract Management Directorate made the audit from March 1989 through February 1990. The audit covered

  12. Navigational Strategies of Migrating Monarch Butterflies

    DTIC Science & Technology

    2014-11-10

    AFRL-OSR-VA-TR-2014-0339 NAVIGATIONAL STRATEGIES OF MIGRATING MONARCH BUTTERFLIES Steven Reppert UNIVERSITY OF MASSACHUSETTS Final Report 11/10/2014...Final Progress Statement to (Dr. Patrick Bradshaw) Contract/Grant Title: Navigational Strategies of Migrating Monarch Butterflies Contract...Grant #: FA9550-10-1-0480 Reporting Period: 01-Sept-10 to 31-Aug-14 Overview of accomplishments: Migrating monarch butterflies (Danaus

  13. Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development. volume 3; Program Cost estimates

    NASA Technical Reports Server (NTRS)

    McCurry, J. B.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

  14. Titan 4 TPS Replacement Implementation Study

    NASA Technical Reports Server (NTRS)

    Jackson, Charles H.

    1996-01-01

    This final report documents the overall progress of the study. It is a general discussion of the documents reviewed, recommendations, trips taken, findings/observations, and proposed corrective actions. In addition, cost data for the contract is addressed. The normal abstract and executive summary provided with most final reports is also provided as a part of this report. A conclusion section is provided that addresses the relative completeness of the Titan 4 TPSR project and this contract.

  15. Final Technical Report for contract number DE-FG02-05ER15670

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glazebrook, Jane

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  16. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  17. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  18. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts for research and development. (d) Use the clause at 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and development. (e) Use the clause at 252.235-7004...

  19. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  20. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  1. Commercial Contract Training, Marine Corps Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. R.; And Others

    The report provides a description of the Phase II findings of a two-phase study to determine if certain Marine Corps skill training requirements could be satisfied through contract with qualified commercial sources. It demonstrates the utility of the commercial contract training concept and contains information useful to Area VOTEC…

  2. The New Jersey Department of Higher Education's Health Manpower Planning Contract. Final Comprehensive Report.

    ERIC Educational Resources Information Center

    Tomson, Jon; Vasilenko, Patricia

    This report of the New Jersey Department of Higher Education's Health Manpower Planning Contract describes project activities and assessment methods and models, presents data on employment supply and demand, and provides samples of questionnaires and forms that were used. The department was required under contract to: survey and evaluate pertinent…

  3. Evaluation of contract time estimation and contracting procedures for louisiana department of transportation and development construction projects : final report : volume I.

    DOT National Transportation Integrated Search

    1995-09-11

    The purpose of the research was to provide the Louisiana Department of Transportation and Development (LaDOTD) with a systematic approach to the determination of contract time and to explore innovative contracting procedures that may prove beneficial...

  4. 78 FR 7821 - Public Availability of Railroad Retirement Board FY 2012 Service Contract Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .../files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The Railroad Retirement Board has... analysis of its selected special interest functions from the FY 2012 Service Contract inventory, and finally (4) the analysis report on its FY 2011 Service Contract Inventory special interest functions, on...

  5. Age 60 study, part III : consolidated database experiments final report.

    DOT National Transportation Integrated Search

    1994-10-01

    This document is one of four products completed as a part of the Age 60 Rule research contract monitored by Pam Della Rocco, Civil Aerospace Medical Institute, Contracting Officer's Technical Representative. This work was performed. This report was a...

  6. Analysis of Commercial Contract Training for the Navy (Phase II) [And] Commercial Contract Training Navy Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. Robert; And Others

    The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Navy skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation. It…

  7. Whither Performance Contracting?

    ERIC Educational Resources Information Center

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  8. Analysis of Commercial Contract Training for the Marine Corps (Phase II) [And] Commercial Contract Training Marine Corps Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. Robert; And Others

    The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Marine Corps skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation.…

  9. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, Nancy R.; Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  10. Support for the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  11. Performance-Based Logistics Contracts: A Basic Overview

    DTIC Science & Technology

    2005-11-01

    world. The Navy began using PBL contracts in 1999, and since then, contract managers have reported improved availability and reduced customer wait...4825 Mark Center Drive • Alexandria, Virginia 22311-1850 CRM D0012881.A2/Final November 2005 Performance-Based Logistics Contracts: A Basic Overview...Performance-Based Logistics (PBL) contracts provide services or sup- port where the provider is held to customer -oriented performance requirements

  12. Final Closeout Report University Research Program in Robotics for Environmental Restoration and Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl Crane

    2004-08-24

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida.

  13. Alternative contracting research : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Alternative contracting methods have become popular alternatives to the traditional practice whose emphasis is on low bid acquisition. The benefits of decreased project schedule, increased job quality, and improved delivery process have demonstrated ...

  14. Triage Decision Trees and Triage Protocols: Changing Strategies for Medical Rescue in Civilian Mass Casualty Situations.

    DTIC Science & Technology

    1984-02-06

    MASS CASUALTY SITUATIONS FINAL REPORT for 0O FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 e FEMA WORK UNIT...20006 FINAL REPORT for FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 FEMA WORK UNIT NUMBER 2412G...February 1984 This repnrt has been reviewed in the Federal Emergency Management Agency and approved for publication. Approval does not signify that the

  15. Towards a Theory for Combining Information From Related Experiments

    DTIC Science & Technology

    2002-11-11

    TITLE AND SUBTITLE Final Report on ARO Contract # DAAD 19-99-1- 1082 entitled “Towards a theory for combining information from related...Contract # DAAD 19-99-1- 1082 4. AUTHOR OF THE REPORT: Francisco J. Samaniego, Principal Investigator 5. PERFPORMING ORGANIZATION: University of...preparation under the support of ARO Contract # DAAD 19-99-1- 1082 [1] "Linear Data Fusion", Proceedings of the Fourth Army Conference on Applied

  16. Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines

    DTIC Science & Technology

    2016-07-01

    ARL-TR-7706 ● JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether...JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines by...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) July 2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) Fiscal Year 2013 4. TITLE

  17. Microcomputer Processing of LANDSAT Thematic Mapper Data for the Acquisition of Military Tactical Terrain Data.

    DTIC Science & Technology

    1985-04-12

    12 9 5 VPV TiTAY T,%. T , TiRAiU A ~ 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(.) 6. CONTRACT OR GRANT NUMBER(a) .-- CPT zi 0 9. PERFORMING ...of period covered, such as the life of a contract covered in a final contractor report. Block 6. Performing Organization Report Number. Only numbers...affiliation of an author if it differs from that of the performing organization. Block 8. Contract or grant Number(s). For a contractor or grantee

  18. Fort Hood Army Internal Review Team: Final Report

    DTIC Science & Technology

    2010-08-04

    Report Date l August 4, 2010 Protecting our Army community at home & abroad Army Internal Review Team : Final Report Report Documentation Page Form...DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Fort Hood Army Internal Review Team : Final Report 5a. CONTRACT NUMBER 5b. GRANT...Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FoRt Hood Army Internal Review team : Final Report August 4, 2010 1 FoRt Hood Army

  19. 48 CFR 1842.7201 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management Reports, the NASA form 533 series, is required on cost-type, price redetermination, and fixed... implemented in the contract based on the estimated final contract value at the time of award. [62 FR 14017...

  20. Special environmental control and life support equipment test analyses and hardware

    NASA Technical Reports Server (NTRS)

    Callahan, David M.

    1995-01-01

    This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

  1. In-Vehicle Information Systems Behavioral Model and Design Support: Final Report

    DOT National Transportation Integrated Search

    2000-02-16

    A great deal of effort went into producing both the model and the prototype software for this contract. The purpose of this final report is not to duplicate the information provided about these and other topics in previous reports. The purpose is to ...

  2. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, N. R.; Ma, C. (Technical Monitor)

    2002-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract Nepal, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during high geodetic and astrometric VLBI evolved through several major changes. This report is divided into five sections that correspond to major task areas in the contract: A) Coordination rid Scheduling, B) Field System, CN Station Support, D) Analysis and Research and Development, and E) Computer Support.

  3. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  4. Summary Report: DoD Information Technology Contracts Awarded Without Competition Were Generally Justified

    DTIC Science & Technology

    2015-09-09

    fifth and final report in a series of audits on IT contracts issued without competition. We nonstatistically selected for review 232 of 602...We are not making any recommendations in this report because we made recommendations in the previous reports in this audit series. If implemented...written justification. We conducted this audit in accordance with generally accepted government auditing standards, except for planning and evidence

  5. National Training Center (NTC) Analysis

    DTIC Science & Technology

    1981-05-29

    CONTRACT FOR S100K NTC CONCEPT STUDY PRESENTATION TO DARPA/TRADOC SIOOK ADD- ON FOR FURTHER NTC CONCEPT DEVELOPMENT SAI CONCEPT FOR 1-ALPHA...Technical Report 29 May 1981 I I I This document is submitted in fulfillment of contract No. DAAK 40-78-C-0198. It is the final report on Phase 1...many technical reports have been published previously. This report draws on these earlier reports and presents a comprehensive summary and overview

  6. Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

    NASA Technical Reports Server (NTRS)

    Hicken, Steve

    1990-01-01

    Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

  7. 2016 availability and disparity study : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    The study examined whether there was a level playing field for minority- and women-owned firms in the Montana transportation : contracting marketplace and for MDT contracting. This information helps MDT set an overall goal for Disadvantage Business :...

  8. Maintenance and Drainage Guidance for the Scott Base Transition, Antarctica

    DTIC Science & Technology

    2014-10-01

    Way Centennial , CO 80112-3938 Final Report Approved for public release; distribution is unlimited. Prepared for National Science Foundation...References Antarctic Support Contract (ASC). 2014. Scott Base Transition Construction and Maintenance Manual. IO-MAN-0003. Centennial , CO: Antarctic...Support Contract. Antarctic Support Contract (ASC). Forthcoming. Snow Road Construction and Maintenance Manual. IO-MAN-xx. Centennial , CO: Antarctic

  9. Traffic Aware Strategic Aircrew Requests (TASAR) Analysis and Development

    NASA Technical Reports Server (NTRS)

    Woods, Sharon E.

    2016-01-01

    This document is the final report and deliverable 30 of Contract No. NNL12AA06C, the Traffic Aware Strategic Aircrew Requests (TASAR) contract awarded via the NASA Research Announcement (NRA). It documents the accomplishments of the contract, the evolution of its role in the overall TASAR project, and lessons learned from its execution.

  10. Feasibility of a Modified Chloramine Process for the Production of UDMH and MMH

    DTIC Science & Technology

    1978-08-31

    that phase is provided in this report . Amine Fuels Production Feasibility Demonstration, MCR -75-466, Final Report and Addendurn I - Data Book, Martin ...Final Report , Martin Marietta Corporation, Denver (February 1976) Contract F04701-74-C-0039. Amine Fuels Production Feasibility Demonstration, MCF-75...466, CDRL A305, Volume I, Final Report ; Volume II Economic Analyses; and Volume III, Data Book; Martin Marietta Corporation, Denver (October 1976

  11. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  12. Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin Institute for Advanced Technology

    DTIC Science & Technology

    1992-10-27

    AD-A27O 238 T Of DTIC ELECTE 8OCT 06 1993 E O F F ICE OF THE 1NSPECTOR GENERAL QUICK REAC.7ION REPORT ON THE AUDIT OF THE ARMY CONTRACT WITH THE...ENGINEERING INSPECTOR GENERAL, DEPARTMENT OF TH, ARMY SUBJECT: Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin...comments on Recommendation 3. by November 27, 1992. The courtesies extended to the audit staff are appreciated. If you have any questions on this final

  13. The Structure and Dynamics of the Solar Corona

    NASA Technical Reports Server (NTRS)

    Mikic, Zoran

    2000-01-01

    This report covers technical progress during the third year of the NASA Space Physics Theory contract "The Structure and Dynamics of the Solar Corona," between NASA and Science Applications International Corporation, and covers the period June 16, 1998 to August 15, 1999. This is also the final report for this contract. Under this contract SAIC, the University of California, Irvine (UCI), and the Jet Propulsion Laboratory (JPL), have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model. During the three-year duration of this contract we have published 49 articles in the scientific literature. These publications are listed in Section 3 of this report. In the Appendix we have attached reprints of selected articles. We summarize our progress during the third year of the contract. Full descriptions of our work can be found in the cited publications, a few of which are attached to this report.

  14. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  15. Structural Damage Prediction and Analysis for Hypervelocity Impact: Consulting

    NASA Technical Reports Server (NTRS)

    1995-01-01

    A portion of the contract NAS8-38856, 'Structural Damage Prediction and Analysis for Hypervelocity Impacts,' from NASA Marshall Space Flight Center (MSFC), included consulting which was to be documented in the final report. This attachment to the final report contains memos produced as part of that consulting.

  16. North American study on contracting snow and ice response : final report.

    DOT National Transportation Integrated Search

    2017-01-01

    Snow and ice control operations are a vital function often conducted by state and local transportation agencies. Many states are choosing to contract snow and ice response services, instead of or in addition to the use of in-house forces, to maintain...

  17. DELTA-DIESEL ENGINE LIGHT TRUCK APPLICATION Contract DE-FC05-97OR22606 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hakim, Nabil Balnaves, Mike

    2003-05-27

    DELTA Diesel Engine Light Truck Application End of Contract Report DE-FC05-97-OR22606 EXECUTIVE SUMMARY This report is the final technical report of the Diesel Engine Light Truck Application (DELTA) program under contract DE-FC05-97-OR22606. During the course of this contract, Detroit Diesel Corporation analyzed, designed, tooled, developed and applied the ''Proof of Concept'' (Generation 0) 4.0L V-6 DELTA engine and designed the successor ''Production Technology Demonstration'' (Generation 1) 4.0L V-6 DELTA engine. The objectives of DELTA Program contract DE-FC05-97-OR22606 were to: Demonstrate production-viable diesel engine technologies, specifically intended for the North American LDT and SUV markets; Demonstrate emissions compliance with significant fuelmore » economy advantages. With a clean sheet design, DDC produced the DELTA engine concept promising the following attributes: 30-50% improved fuel economy; Low cost; Good durability and reliability; Acceptable noise, vibration and harshness (NVH); State-of-the-art features; Even firing, 4 valves per cylinder; High pressure common rail fuel system; Electronically controlled; Turbocharged, intercooled, cooled EGR; Extremely low emissions via CLEAN Combustion{copyright} technology. To demonstrate the engine technology in the SUV market, DDC repowered a 1999 Dodge Durango with the DELTA Generation 0 engine. Fuel economy improvements were approximately 50% better than the gasoline engine replaced in the vehicle.« less

  18. Intense and Broadband THz Source using Laser-Induced Gas Plasma

    DTIC Science & Technology

    2009-08-26

    Subject: STTR PHASE I FINAL REPORT Author: Norman Laman , Thomas Tongue Date: 8/26/09 STTR Topic #: AF08-009 Submission Date: 8/26/09...Phase I Final Report Report Period: 11/1/2008 – 7/31/2009 Contract: FA9550-09-C-0059 CLIN#: 0001CC Prepared by Norman Laman , Thomas Tongue...c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 Subject: STTR PHASE I FINAL REPORT Author: Norman Laman

  19. International ultraviolet explorer observatory operations

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This volume contains the Final Report for the International Ultraviolet Explorer (IUE) Observatory Operations contract, NAS5-28787. The report summarizes the activities of the IUE Observatory over the 13-month period from November 1985 through November 1986 and is arranged in sections according to the functions specified in the Statement of Work (SOW) of the contract. In order to preserve numerical correspondence between the technical SOW elements specified by the contract and the sections of this report, project management activities (SOW element 0.0.) are reported here in Section 7, following the reports of technical SOW elements 1.0 through 6.0. Routine activities have been summarized briefly whenever possible; statistical compilations, reports, and more lengthy supplementary material are contained in the Appendices.

  20. 48 CFR 52.216-7 - Allowable Cost and Payment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... last disclosure of internal audit reports to the Government. (J) Annual internal audit plan of...-contract cost allowability limitations, and billing limitations. (v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct...

  1. Tri-level study of the causes of traffic accidents. Volume 1, Causal factor tabulations and assessments

    DOT National Transportation Integrated Search

    1977-03-31

    This is the Final Report of the "Tri-Level Study of the Causes of Traffic Accidents," performed by the Indiana University Institute for Research in Public Safety (IRPS), under contract to the National Highway Traffic Safety Administration (Contract N...

  2. Space station final study report. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1987-01-01

    Volume 1 of the Final Study Report provides an Executive Summary of the Phase B study effort conducted under contract NAS8-36526. Space station Phase B implementation resulted in the timely establishment of preliminary design tasks, including trades and analyses. A comprehensive summary of project activities in conducting this study effort is included.

  3. NRC/AMRMC Resident Research Associateship Program

    DTIC Science & Technology

    2018-05-01

    Award Number: W81XWH-12-2-0010 TITLE: NRC/AMRMC Resident Research Associateship Program PRINCIPAL INVESTIGATOR: Howard Gamble CONTRACTING...ORGANIZATION: NATIONAL ACADEMY OF SCIENCES Washington, DC 20001 REPORT DATE: May 2018 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research ...1. REPORT DATE May 2018 2. REPORT TYPE Final 3. DATES COVERED 6 Feb 2012 - 28 Feb 2018 4. TITLE AND SUBTITLE NRC/AMRMC Resident Research Associateship

  4. Research to Support Intelligent Data Management

    NASA Technical Reports Server (NTRS)

    Lerner, B. T.

    1998-01-01

    This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-Tech's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system are presented.

  5. Research to Support Intelligent Data Management

    NASA Technical Reports Server (NTRS)

    Lerner, Bao-Ting

    1998-01-01

    This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-TECH's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system, are presented.

  6. Review of Department Identified Contracts and Grants for Public Relations Services. Final Inspection Report. ED-OIG/I13-F0012

    ERIC Educational Resources Information Center

    US Department of Education, 2005

    2005-01-01

    The objective of this inspection was to review the materials produced under 20 contracts and 15 grants issued by the Department of Education (Department) to determine whether any of the contracts and grants resulted in covert propaganda. It has been concluded that none of the grants resulted in covert propaganda under the existing guidance of the…

  7. Anisotropic Grid Generation

    DTIC Science & Technology

    2016-03-24

    AFRL-AFOSR-VA-TR-2016-0129 ANISOTROPIC GRID GENERATION | Deliverables Daniel Sievenpiper UNIVERSITY OF CALIFORNIA SAN DIEGO Final Report 03/24/2016...ORGANIZATION. 1. REPORT DATE (DD-MM-YYYY) 12-03-2016 2 . REPORT TYPE Final report 3. DATES COVERED (From - To) 15-12-2012 - 14-12-2015 4. TITLE AND...SUBTITLE Anisotropic Grid Generation 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-13-1-0014 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Daniel

  8. Extended Storage of Pathogen-Reduced Platelet Concentrates (PRECON)

    DTIC Science & Technology

    2017-12-01

    J. Slichter, MD CONTRACTING ORGANIZATION: Bloodworks Northwest Seattle, WA 98104 REPORT DATE : December 2017 TYPE OF REPORT: Final PREPARED FOR...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE December 2017 2. REPORT TYPE Final 3. DATES COVERED 26-SEP-13 to 25-SEP-17 4. TITLE AND SUBTITLE...comparator. Both the stored and the fresh platelets 4 were administered simultaneously using two different radioisotopes ( ≤15 μCi of indium for the

  9. A Theory of Diagnostic Inference: Contract Final Report,

    DTIC Science & Technology

    1983-11-01

    and I-bLications ftlated to this Contract ........ 19 1caml.igmnts and Scientific I&VOuMM1.......................... 21 M&i 2 This report esunarizes our... Comunications Sciences Division Naval Training Equipment Center Code 7500 Orlando, FL 32813 Naval Research Laboratory Washington, D. C. 20375 Dr. Gary...Dr. A. L. Slafkosky Scientific Advisor Commander Commandant of the Marine Corps Naval Electronics Systems Co-and C6de RD-1 Human Factors Engineering

  10. Final Evaluation Report on the Texarkana Dropout Prevention Program.

    ERIC Educational Resources Information Center

    Andrew, Dean C.; Roberts, Lawrence H.

    The Texarkana Dropout Prevention Program is an educational innovation in which (1) a private company was placed under contract to set up special, remedial instruction in the public schools, and (2) the company was to be paid according to the results produced under a performance contract. Dorsett Educational Systems operated six rapid learning…

  11. Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development. volume 1; Executive summary

    NASA Technical Reports Server (NTRS)

    McCurry, J.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

  12. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  13. Power Plant Replacement Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to bemore » self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.« less

  14. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  15. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  16. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  17. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  18. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  19. 48 CFR 552.232-72 - Final Payment Under Building Services Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Building Services Contracts. 552.232-72 Section 552.232-72 Federal Acquisition Regulations System GENERAL... and Clauses 552.232-72 Final Payment Under Building Services Contracts. As prescribed in 532.904(c), insert the following clause: Final Payment Under Building Services Contracts (NOV 2009) Before final...

  20. 48 CFR 32.605 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue a final decision as required by 33.211 if— (1) The contracting officer and the contractor are unable... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final decisions. 32.605...

  1. Safety of railroad passenger vehicle dynamics : final summary report

    DOT National Transportation Integrated Search

    2002-07-01

    This report is a summary of all the work done by Foster-Miller on the passenger rail vehicle dynamic safety under the contract awarded by the FRA. The report presents key issues and findings in the safety assessments and a safety assessment methodolo...

  2. High Resolution Radioluminescence Microscopy for the Study of Prostate Tissue Slice Cell Metabolism and Monitoring of Treatment Response

    DTIC Science & Technology

    2016-12-01

    REPORT DATE : December 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012...display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) December 2016 2. REPORT...TYPE Final 3. DATES COVERED (From - To) 30Sept2014 - 29Sept2016 4. TITLE AND SUBTITLE Monitoring of Treatment Response 5a. CONTRACT NUMBER High

  3. Dielectric Loaded Broadband Gyro-TWT System

    DTIC Science & Technology

    1993-12-31

    A•wov•] f~ •ubic re] ease ;a AD-A277 889 -4 LLV t Final Report 01 Jan 92 - 31 Dec 93 DIELECTRIC LOADED BROADBAND GYRO- TWT SYSTEM Professor N. C...Loaded Broadband Gyro- TWT System" CONTRACT / GRANT NO.: F49620-92-J-O 175 CONTRACT / GRANT VALUE: $89,816 Acce’son For CONTRACT / GRANT PERIOD OF... Broadband Dielectric-Loaded Gyro- TWT Amplifier," submitted for publication to Physics Review Letters, October, 1993. A. Gover, F.V. Hartemann, G.P. Le

  4. Pratt & Whitney/Boeing Engine Validation of Noise Reduction Concepts Final Report for NASA Contract NAS3-97144, Phase 2

    NASA Technical Reports Server (NTRS)

    Bock, Larry A.; Hauser, Joseph E.; Mathews, Douglas C.; Topol, David A.; Bielak, Gerald W.; Lan, Justin H.; Premo, John W.

    2014-01-01

    This report presents results of the work completed in Phase 2 of the Engine Validation of Noise Reduction Concepts (EVNRC) contract. The purpose of the program is to validate, through engine testing, advanced noise reduction concepts aimed at reducing engine noise up to 6 EPNdB and improving nacelle suppression by 50 percent relative to 1992 technology. Phase 1 of the program is completed and is summarized in NASA/CR-2014-218088.

  5. Long Wavelength Electromagnetic Light Bullets Generated by a 10.6 micron CO2 Ultrashort Pulsed Source

    DTIC Science & Technology

    2016-11-29

    AFRL-AFOSR-VA-TR-2016-0365 Long Wavelength Electromagnetic Light Bullets Generated by a 10.6 micron CO2 Ultrashort Pulsed Source Jerome Moloney...SUBTITLE "Long Wavelength Electromagnetic Light Bullets Generated by a 10.6 micron CO2 Ultrashort Pulsed Source 5a. CONTRACT NUMBER FA9550-15-1-0272 5b...afosr.reports.sgizmo.com/s3/> Subject: Final Report to Dr. Arje Nachman Contract/Grant Title: Long Wavelength Electromagnetic Light Bullets Generated by a 10.6

  6. Review and analysis of ASAP enforcement efforts, volume 4

    DOT National Transportation Integrated Search

    1975-08-01

    This Final Report recapitulates and summarizes the work of a contract on Review and Analysis of ASAP Enforcement Effort. The major sections of the report are contained in four volumes. Volume 1, Methods for Recording the Behavior of Drinking Drivers,...

  7. Review and analysis of ASAP enforcement efforts, volume 3

    DOT National Transportation Integrated Search

    1975-08-01

    This Final Report recapitulates and summarizes the work of a contract on Review and Analysis of ASAP Enforcement Effort. The major sections of the report are contained in four volumes. Volume 1, Methods for Recording the Behavior of Drinking Drivers,...

  8. Review and analysis of ASAP enforcement efforts, volume 1

    DOT National Transportation Integrated Search

    1975-08-01

    This Final Report recapitulates and summarizes the work of a contract on : Review and Analysis of ASAP Enforcement Effort. The major sections of the report : are contained in four volumes. : Volume 1, Methods for Recording the Behavior of Drinking Dr...

  9. Review and analysis of ASAP enforcement efforts, volume 2

    DOT National Transportation Integrated Search

    1975-08-01

    This Final Report recapitulates and summarizes the work of a contract on Review and Analysis of ASAP Enforcement Effort. The major sections of the report are contained in four volumes. Volume 1, Methods for Recording the Behavior of Drinking Drivers,...

  10. Magic 2010 RASR Team

    DTIC Science & Technology

    2010-12-15

    MAGIC 2010 – FINAL REPORT RASR TEAM - CONTRACT NO: FA2386-10-1-4021 December 15, 2010 Final Report for AOARD Grant FA23861014021 – MAGIC ... MAGIC 2010 Competition - Robotic Research Team (RASR) Abstract: The RASR team developed a system for the coordination of groups of unmanned...accomplish those missions. Our team goal was to develop a system that can provide long term value to the war-fighter, utilizing MAGIC 2010 as a stepping

  11. Investigation of Voltage-Activated BAW Devices and Filters

    DTIC Science & Technology

    2016-09-04

    strontium titanate (STO) and barium-strontium titanate (BST), with the ultimate objective of creating high- performance, reconfigurable filters and...Distribution Unlimited UU UU UU UU 04-09-2016 1-Sep-2010 31-Aug-2014 Final Report: Investigation of Voltage-Activated BAW Devices and Filters The views...2016 Investigation of Voltage-Activated BAW Devices and Filters Final Report Award Information: Contract Number: W911NF1010286 Period of Work

  12. 76 FR 26296 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Finding Officer's Final Report and Recommendations. Closed Session 1. Staff Briefing and Discussion on Trends in Filed Service Contracts: Indexes, Service Terms, and Dispute Resolution. 2. Staff Briefing and...

  13. Study of Factors Determining the Gain Characteristics of DOIL Active Medium

    DTIC Science & Technology

    2009-04-17

    2009 2. REPORT TYPE Final Report 3. DATES COVERED (From – To) 01-Mar-08 - 17-Apr-09 5a. CONTRACT NUMBER ISTC Registration No: 3835 5b...MONITOR’S REPORT NUMBER(S) ISTC 06-7006 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution is unlimited. 13

  14. Interactive Video Program. Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Midwestern Higher Education Commission, Minneapolis, MN.

    This report presents recommendations on interactive video transmission standards, equipment, room designs, and service plans for member institutions of the Midwestern Higher Education Commission (MHEC) and reviews MHEC's efforts to find and contract for such services with vendors. The report describes the MHEC objective of establishing a dial-up,…

  15. Gas turbine engines and transmissions for bus demonstration program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nigro, D.N.

    1981-11-01

    This final report is to fulfill the contractural requirements of Contract DE-AC02-78CS54867 which required the delivery of 11 Allison GT 404-4 Industrial Gas Turbine Engines and five HT740CT and six V730CT Allison Automatic Transmissions for the Greyhound and Transit Coaches, respectively. In addition, software items such as cost reports, technical reports, installation drawings, acceptance test data and parts lists were required. Engine and transmission deliveries were completed with shipment of the last power package on 11 April 1980. Software items were submitted when required during the performance period of this contract.

  16. Flocking in Distributed Control and Optimization

    DTIC Science & Technology

    2015-06-01

    AFRL-AFOSR-VA-TR-2015-0309 Flocking in Distributed Control and Optimization Alfredo Garcia UNIVERSITY OF VIRGINIA Final Report 06/01/2015... control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION. 1. REPORT DATE (DD-MM-YYYY)      30-09-2015 2. REPORT TYPE Final Performance 3...DATES COVERED (From - To) 01-04-2012 to 31-03-2015 4. TITLE AND SUBTITLE Flocking in Distributed Control and Optimization 5a.  CONTRACT NUMBER 5b

  17. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  18. High speed packet switching

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document constitutes the final report prepared by Proteon, Inc. of Westborough, Massachusetts under contract NAS 5-30629 entitled High-Speed Packet Switching (SBIR 87-1, Phase 2) prepared for NASA-Greenbelt, Maryland. The primary goal of this research project is to use the results of the SBIR Phase 1 effort to develop a sound, expandable hardware and software router architecture capable of forwarding 25,000 packets per second through the router and passing 300 megabits per second on the router's internal busses. The work being delivered under this contract received its funding from three different sources: the SNIPE/RIG contract (Contract Number F30602-89-C-0014, CDRL Sequence Number A002), the SBIR contract, and Proteon. The SNIPE/RIG and SBIR contracts had many overlapping requirements, which allowed the research done under SNIPE/RIG to be applied to SBIR. Proteon funded all of the work to develop new router interfaces other than FDDI, in addition to funding the productization of the router itself. The router being delivered under SBIR will be a fully product-quality machine. The work done during this contract produced many significant findings and results, summarized here and explained in detail in later sections of this report. The SNIPE/RIG contract was completed. That contract had many overlapping requirements with the SBIR contract, and resulted in the successful demonstration and delivery of a high speed router. The development that took place during the SNIPE/RIG contract produced findings that included the choice of processor and an understanding of the issues surrounding inter processor communications in a multiprocessor environment. Many significant speed enhancements to the router software were made during that time. Under the SBIR contract (and with help from Proteon-funded work), it was found that a single processor router achieved a throughput significantly higher than originally anticipated. For this reason, a single processor router was developed and the final delivery under this contract will include a single processor CNX-500 router. The router and its interface boards (2 FDDIs and 2 dual-ethernets) are all product-quality components.

  19. 78 FR 13521 - Great Lakes Pilotage Rates-2013 Annual Review and Adjustment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Reconciliation Act CPA Certified Public Accountant CPI Consumer Price Index E.O. Executive Order FR Federal... contract with independent accountants to assist in that review. This final rule is based on the review of... reports of the independent accountants, before the review is finalized. Comments by the pilots...

  20. SEDSAT

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Under this contract the Students for the Exploration and Development of Space Satellite number One (SEDSAT-1 or just SEDSAT) was completed and launched on 24-Oct-98. It achieved nominal orbit and activated its transponders after Delta II separation. Telemetry has indicated the internal systems are normal. However, SEDSAT has not responded to subsequent uplink commands. Telemetry has continued to be received allowing evaluation of bus performance and attempts at anomaly resolution. Anomaly resolution will continue during 1999 subsequent to the end of this contract. This final report documents activities under the contract period.

  1. Qualification Lab Testing on M1 Abrams Engine Oil Filters

    DTIC Science & Technology

    2016-11-01

    UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K. Rutta U.S...the originator. UNCLASSIFIED QUALIFICATION LAB TESTING ON M1 ABRAMS ENGINE OIL FILTERS FINAL REPORT TFLRF No. 483 by Kristi K...TITLE AND SUBTITLE Qualification Lab Testing on M1 Abrams Engine Oil Filter 5a. CONTRACT NUMBER W56HZV-15-C-0030 5b. GRANT NUMBER 5c. PROGRAM

  2. ATE/ICEPM Development Report and Function Demonstration Test.

    DTIC Science & Technology

    1975-01-01

    DTfC JANUARY 1975 S U gl CONTRACT NO. DAAE07-73-C-0268 F - - -- - - b,,-4, i .y TRW SYSTEMS GROUP D - PROPULSION SYSTEMS LABORATORY t 82 07 22 067 II i ...DEMONSTRATION TEST FINAL REPORT Contract No. DAAEO7-73--C-0268 XccessiOf Yor U~ ultis. GFA& I copy~ t e!A C3 PY;E lilannoQ*C~INSPECTED otIo - Prepared by Bye...program L o Improvement of system hardware I o Preparation of systems support material 2.1 Development of the Diagnostic Engineering Structure The

  3. Sensing technology for damage assessment of sign supports and cantilever poles : final report, August 31, 2010.

    DOT National Transportation Integrated Search

    2010-08-31

    This report presents the results of research activities conducted under Contract No. 519691-PIT 008 on Sensing Technology for : Damage Assessment of Sign Supports and Cantilever Poles between the University of Pittsburgh and the Pennsylvania De...

  4. Anisotropic Interactions between Cold Rydberg Atoms

    DTIC Science & Technology

    2015-09-28

    AFRL-AFOSR-CL-TR-2015-0002 Anisotropic interactions between cold Rydberg atoms Luis Marcassa INSTITUTO DE FISICA DE SAO CARLOS Final Report 09/28...problem with the report +551633739806 Organization / Institution name Instituto de Fisica de Sao Carlos Grant/Contract Title The full title of the

  5. 100% Solids Polyurethane Sequestration Coating

    DTIC Science & Technology

    2014-04-11

    Distribution Unlimited 100% Solids Polyurethane Sequestration Coating The views, opinions and/or findings contained in this report are those of the...Papers published in non peer-reviewed journals: 100% Solids Polyurethane Sequestration Coating Report Title Report developed under Topic #CBD13-101...Final Technical Report Contract #: W911NF-13-P-0010 Proposal #: 63958CHSB1 Project: 100% Solids Polyurethane Sequestration Coating

  6. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  7. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  8. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  9. Molecular Mechanisms Underlying Individual Differences in Response to Stress in a Previously Validated Animal Model of PTSD

    DTIC Science & Technology

    2012-04-01

    CONTRACTING ORGANIZATION: Bronx Veterans Medical Research Foundation, Inc... Bronx , NY 10468-3904 REPORT DATE: April 2012 TYPE OF REPORT: Final PREPARED FOR: U.S. Army...WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Bronx Veterans Medical Research

  10. Medicare and state health care programs: fraud and abuse, civil money penalties and intermediate sanctions for certain violations by health maintenance organizations and competitive medical plans--HHS. Final rule.

    PubMed

    1994-07-15

    This final rule implements sections 9312(c)(2), 9312(f), and 9434(b) of Public Law 99-509, section 7 of Public Law 100-93, section 4014 of Public Law 100-203, sections 224 and 411(k)(12) of Public Law 100-360, and section 6411(d)(3) of Public Law 101-239. These provisions broaden the Secretary's authority to impose intermediate sanctions and civil money penalties on health maintenance organizations (HMOs), competitive medical plans, and other prepaid health plans contracting under Medicare or Medicaid that (1) substantially fail to provide an enrolled individual with required medically necessary items and services; (2) engage in certain marketing, enrollment, reporting, or claims payment abuses; or (3) in the case of Medicare risk-contracting plans, employ or contract with, either directly or indirectly, an individual or entity excluded from participation in Medicare. The provisions also condition Federal financial participation in certain State payments on the State's exclusion of certain prohibited entities from participation in HMO contracts and waiver programs. This final rule is intended to significantly enhance the protections for Medicare beneficiaries and Medicaid recipients enrolled in a HMO, competitive medical plan, or other contracting organization under titles XVIII and XIX of the Social Security Act.

  11. Ultralow Noise Monolithic Quantum Dot Photonic Oscillators

    DTIC Science & Technology

    2013-10-28

    HBCU/MI) ULTRALOW NOISE MONOLITHIC QUANTUM DOT PHOTONIC OSCILLATORS LUKE LESTER UNIVERSITY OF NEW MEXICO 10/28/2013 Final Report DISTRIBUTION A...TELEPHONE NUMBER (Include area code) 24-10-2013 Final 01-06-2010 to 31-05-2013 Ultralow Noise Monolithic Quantum Dot Photonic Oscillators FA9550-10-1-0276...277-7647 Reset Grant Title: ULTRALOW NOISE MONOLITHIC QUANTUM DOT PHOTONIC OSCILLATORS Grant/Contract Number: FA9550-10-1-0276 Final Performance

  12. Point of Injury Sampling Technology for Battlefield Molecular Diagnostics

    DTIC Science & Technology

    2011-11-14

    Injury" Sampling Technology for Battlefield Molecular Diagnostics November 14, 2011 Sponsored by Defense Advanced Research Projects Agency (DOD...Date of Contract: April 25, 2011 Short Title of Work: "Point of Injury" Sampling Technology for Battlefield Molecular Diagnostics " Contract...PHASE I FINAL REPORT: Point of Injury, Sampling Technology for Battlefield Molecular Diagnostics . W31P4Q-11-C-0222 (UNCLASSIFIED) P.I: Bernardo

  13. Investigation of accident reduction by grooved concrete pavement : final report.

    DOT National Transportation Integrated Search

    1979-06-01

    This report is a category 2 experimental project evaluation written in conjunction with EHS-I-10-3(93)158 and EHS-I-12-1(44)0 contracted to groove hardened PCC pavement. In it the wear characteristics, pavement texture, skid resistance, and the accid...

  14. Bid opening report : Federal-aid highway construction contracts : first six months 1999

    DOT National Transportation Integrated Search

    1996-05-01

    This second volume of the draft final report focuses on specialized travel trends in the Puget Sound panel data from 1989 through 1993. Trips were catagorized by purpose and mode, with each trip of each wave characterized by three variables: total tr...

  15. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  16. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  17. Data Mining Research for Information Security

    DTIC Science & Technology

    2016-01-29

    AFRL-AFOSR-JP-TR-2016-0028 Data Mining Research for Information Security Kevin Barton Texas A&M University-San Antonio Final Report 01/29/2016...Final 3.  DATES COVERED (From - To)      20-05-2014 to 19-05-2015 4.  TITLE AND SUBTITLE Data Mining Research for Information Security 5a.  CONTRACT

  18. Game Engineering a Multiagent Systems Perspective

    DTIC Science & Technology

    2016-07-21

    AFRL-AFOSR-VA-TR-2016-0260 Game Engineering A Multiagent Systems Perspective Jason Marden REGENTS OF THE UNIVERSITY OF COLORADO THE 3100 MARINE ST...21-06-2016 2. REPORT TYPE Final Report 3. DATES COVERED (From - To) 07/01/2012 - 06/30/2015 4. TITLE AND SUBTITLE Game Engineering A Multiagent...for public release. AFOSR  Project  Final  Summary   Jason  R.  Marden   Contract/Grant  Title:     Game Engineering A Multiagent

  19. SEGMAG Machines for Marine Electrical Propulsion Systems

    DTIC Science & Technology

    1978-09-13

    78-9B2-SYSTA-Rj P4 SIG•(AG MACHINES VOR MARINE ELECTRICAL PROPULSION SYSTBILS Final Report Submitted to Office of Naval Research R.A. Feranchak, R. B...MACHINES FOR MARINE ELECTRICAL PROPULSION SYSTEMS Final Technical Report Submitted to Office of Naval Research Contract N00014-.77-C-0307 Feranchak, R. A...OF0ANI ZATION NAME AND ADDRESS 0., PROGRAM ELtEMNT.PROJECT, TASK~~.i~ckev ~eiAREA & WORK UNIT NUMBERS Westinghouse Research & Develepment Center 1310

  20. Many-Versus-Many Stochastic Duels

    DTIC Science & Technology

    1984-01-14

    MANY-VERSUS-MANY STOCHAS!’IC DUELS FINAL REPORT cO C. J, ANCKER, JR. 00 A. V. GAFARIAN JANUARY 14, 1985 U. S, ARMY RESEARCH OFFICE CONTRACT/DAAG29-81...Y) n- N/A 14. TITLE (and Subtitle) S. TYPE OF REPORT & PERIOD COVERED Final, 21 September 1981 MANY-VERSUS-MANY STOCHASTIC DUELS through 20 September...necessary and Identify by block number) -. Stochastic) Duels ) Many-Versus-Many) Bibliography, 2(L ABSTRACT (Centhoue so reverse sEsfl R necessay and

  1. Physics-based Inverse Problem to Deduce Marine Atmospheric Boundary Layer Parameters

    DTIC Science & Technology

    2017-03-07

    please find the Final Technical Report with SF 298 for Dr. Erin E. Hackett’s ONR grant entitled Physics-based Inverse Problem to Deduce Marine...From- To) 07/03/2017 Final Technica l Dec 2012- Dec 2016 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Physics-based Inverse Problem to Deduce Marine...SUPPLEMENTARY NOTES 14. ABSTRACT This report describes research results related to the development and implementation of an inverse problem approach for

  2. Evaluation of the Regional Educational Laboratories. Final Report. NCEE 2015-4008

    ERIC Educational Resources Information Center

    Carison, Elaine; Bitterman, Amy; Zhang, Xiaodong; Lee, Hyunshik; Gutmann, Babette; Wills, Kerri; Sinclair, Beth

    2015-01-01

    This report is the second from the congressionally-mandated evaluation of the Regional Educational Laboratory (REL) program authorized by the Education Sciences Reform Act (P.L. 107-279). For this report, 8 (out of 24) impact study reports produced by the RELs under their 2006-2011 contracts and published by IES were rated by expert panels for…

  3. 16 CFR 700.8 - Warrantor's decision as final.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... jurisdiction over suits for breach of warranty and service contract. ... decision as final. A warrantor shall not indicate in any written warranty or service contract either... party is final or binding in any dispute concerning the warranty or service contract. Nor shall a...

  4. NASA-KSC/Florida Dual Use Technology Partnership

    NASA Technical Reports Server (NTRS)

    Kershaw, David

    2001-01-01

    This document constitutes the Technological Research and Development Authority's (TRDA) Final Reports for the NASA-KSC/Florida Dual Use Technology Partnership grant covering the period December 1, 1999 through November 30, 2000. The NASA Grant and Cooperative Agreement Handbook requires the TRDA to provide NASA with a final report on Subject Inventions, Federal Cash Transactions, Summary Research, and Federally-Owned Property. This report contains those requirements as well as a description of the TRDA's grant performance related to activities undertaken, difficulties incurred, remedial actions, and the current financial status of the contract.

  5. 77 FR 45539 - Great Lakes Pilotage Rates-2013 Annual Review and Adjustment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... financial information, and we contract with independent accountants to assist in that review. We have now completed our review of the independent accountant's 2010 financial reports. The comments by the pilot associations on those reports and the independent accountant's final findings are discussed in our document...

  6. Professional Personnel Evaluation System: 1983-84 Final Technical Report.

    ERIC Educational Resources Information Center

    Doss, David A.

    This technical report summarizes the evaluation ratings given to professionals on probation or up for contract renewal in the Austin Independent School District. Graphs, tables, and rankings are presented for each specified population: all district teachers combined; teachers by school level (elementary, junior high, senior high); teachers by…

  7. Report on the Audit of Foreign Direct Selling Costs

    DTIC Science & Technology

    1990-09-18

    This is our final report on the Audit of Foreign Direct Selling Costs. The Contract Management Directorate made the audit from October 1989 to...The objective of the audit was to assess whether DoD regulations provided the appropriate incentives to stimulate exports by the. U.S. Defense

  8. Modular Radioisotope Thermoelectric Generator (RTG) Program. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    Section 2.0 of this report summarizes the MOD-RTG reference flight design, and Section 3.0 discusses the Ground Demonstration System design. Multicouple technology development is discussed in Section 4.0, and Section 5.0 lists all published technical papers prepared during the course of the contract.

  9. Precomplexation and Activation of Carboxylate and Phosphate Esters

    DTIC Science & Technology

    1992-03-02

    SUBJECT TERMS (Continue on reverse if necessary and identify by block number) FIELD GROUP SUB-GROUP 07 03 19 ABSTRACT (Continue on reverse if...necessary and identify by block number) This is the final report for contract N00014-88-K-0309. It summarizes our previously submitted Technical Reports #1

  10. Mechanistic Studies of Oligonucleotide Aptamers With Potent Antiproliferative and Pro-Apoptotic Activity Against Prostate Cancer Cells

    DTIC Science & Technology

    2007-05-01

    AD_________________ Award Number: W81XWH-04-1-0183 TITLE: Mechanistic Studies of Oligonucleotide...Ph.D. CONTRACTING ORGANIZATION: University of Louisville...Louisville, KY 40292-0001 REPORT DATE: May 2007 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command

  11. Concept Development Modular Hybrid Pier (MHP)

    DTIC Science & Technology

    2000-02-01

    rated FRP composite bridge or bridge deck is commercially available from Creative Pultrusions, Kansas Structural Systems, Martin - Marietta , Hardcore...NAVAL FACILITIES ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 Contract Report CR 00-001-SHR FINAL REPORT PHASE 1 - CONCEPT...20000301 043 Approved for public release; distribution is unlimited. DTIC QUALITY IMWSOfBD 4 ^^ Printed on recycled paper REPORT DOCUMENTATION PAGE

  12. 78 FR 66639 - Modifications of Certain Derivative Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... Modifications of Certain Derivative Contracts AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final... to the transfer or assignment of certain derivative contracts. The final regulations provide guidance to the nonassigning counterparty to a derivative contract and an assignee on certain notional...

  13. A Control Strategy for High-Performance Macromolecular Materials

    DTIC Science & Technology

    2007-01-04

    None as of this date. Potential transitions with Moldflow Corporation, Boston, MA. New Discoveries None as of this date. Contract FA9550-06-C-0017, Final Technical Report, Submitted by Nonlinear Control Strategies, Inc.

  14. 78 FR 16268 - Submission for OMB Review; Service Contracts Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... the final rule. DATES: Interested parties should submit written comments to the Regulatory Secretariat... between the hours that a simple disclosure by a very small business might require and the much higher...

  15. Heavy point frog performance under passenger vehicles : final report.

    DOT National Transportation Integrated Search

    2016-06-01

    Federal Railroad Administration contracted with the Transportation Technology Center, Inc., Pueblo, Colorado, to conduct an : investigation of passenger vehicle performance running through heavy point frog (HPF) up to speeds of 110 mph. A NUCARS : ...

  16. Intense Relativistic Electron Beam Investigations

    DTIC Science & Technology

    1979-04-01

    facility early it. the second year of the contract. An extensive X-ray radiation survey using TLD dosimeters indicated the need for some additional... Dosimeter for 105 to 107 Roentgen Range," Analytical Chemistry 28(10), 1580-2 (1956). 9. "Search and Discovery -- Update on free- electron lasers and...AFOSR-TR-7-3t f FINAL REPORT TO THE AIR FORCE OFFICE OF SCIENTIFIC RESEARCH 00• on INTENSE RELATIVISTIC ELECTRON BEAM INVESTIGAZIONS AFOSR Contract

  17. Addendum to the Final Audit Report on Procurement of Spare Parts and Supplies

    DTIC Science & Technology

    1993-06-04

    Contraves USA, Simulation and Systems Integration, Tampa, FL Contract No.: N00104-89-G-A050-4009 Awarded: April 20, 1990 Procurement Method...awarded sole source to Contraves . The amplifier is a source-controlled item, and Contraves is the only approved source. There are no commercial...The total contract value was $69,552. Contraves assembled and tested the amplifiers. For the subject procurement, Contraves paid $* per unit for the

  18. Multibeam Formation with a Parametric Sonar

    DTIC Science & Technology

    1976-03-05

    AD-A022 815 MULTIBEAM FORMATION WITH A PARAMETRIC SONAR Robert L. White Texas University at Austin Prepared for: Office of Naval Research 5 March...PARAMETRIC SONAR Final Report under Contract N00014-70-A-0166, Task 0020 1 February - 31 July 1974 Robe&, L. White OFFICE OF NAVAL RESEARCH Contract N00014...78712 APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED. r-X: ~ ... ABSTRACT Parametric sonar has proven to be an effective concept in sonar

  19. Correlation of Flammability Test Data on Antimisting Fuels.

    DTIC Science & Technology

    1982-12-01

    Inverness Drive East Act Englewood, Colorado 80112 December 1982 .* ; -: Final Report A This document is available to the U.S. public through the National...No. (TRAIS) Falcon Research and Development Company 109 Inverness Drive East 1). Contract o, Grant No. Englewood, Colorado 80112 DTFA03-80-C-00061 13...Corporation. The Contract Project Manager at Falcon’s Englewood, Colorado , facility was Mr. Levelle Mahood, who also served as principal investigator in

  20. SRB Environment Evaluation and Analysis. Volume 3: ASRB Plume Induced Environments

    NASA Technical Reports Server (NTRS)

    Bender, R. L.; Brown, J. R.; Reardon, J. E.; Everson, J.; Coons, L. W.; Stuckey, C. I.; Fulton, M. S.

    1991-01-01

    Contract NAS8-37891 was expanded in late 1989 to initiate analysis of Shuttle plume induced environments as a result of the substitution of the Advanced Solid Rocket Booster (ASRB) for the Redesigned Solid Rocket Booster (RSRB). To support this analysis, REMTECH became involved in subscale and full-scale solid rocket motor test programs which further expanded the scope of work. Later contract modifications included additional tasks to produce initial design cycle environments and to specify development flight instrumentation. Volume 3 of the final report describes these analyses and contains a summary of reports resulting from various studies.

  1. Defense Small Business Innovation Research Program (SBIR) Abstracts of Phase 2 Awards: Fiscal Year 1987 (ARMY)

    DTIC Science & Technology

    1987-01-01

    Program, this report presents the abstracts of those proposals which have resulted in contract awards. Further, the name and address of each firm...CONDITIONS; AND, PRODUCE A FINAL REPORT AND A FINAL DESIGN PACKAGE THAT CAN BE USED IN THE PRODUCTION OF THE UNIT. BY THE END OF PHASE II THE ARMY CAN...NUMBER: DAAD07-87-C-107 ROGER W ANDERSON TITLE: AUTOMATED WEATHER FACTOR ANALYSIS AND DISPLAY TOPIC# 71 OFFICE: LABCOM/ASL IDENT#: 16015 SMALL BUSINESS

  2. Final Close-Out Report for DE-FG02-93ER40764

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gyulassy, Miklos

    This is a final close-out report for DOE contract DE-FG02-93ER40764 at Columbia University in New York that funded nuclear theory research at Columbia from 12/15/1992 to 12/14/2015. Highlight of research results from the last FY 2015 period, a list of all 12 PhD students trained through the whole grant, and a list of 201 original papers published from 1993-2015 with impact factor metrics are presented.

  3. Definition of ground test for verification of large space structure control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    1994-01-01

    Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

  4. Communication Platform Payload Definition (CPPD) study. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    Hunter, E. M.; Driggers, T.; Jorasch, R.

    1986-01-01

    This is Volume 2 (Technical Report) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  5. Magnetic Characterization of Organic Materials

    DTIC Science & Technology

    2016-12-12

    measurements. Magnetic shielding of nearby optical components was achieved for reliable experimental results. Magnetic -field applied ultrafast broadband...AFRL-AFOSR-JP-TR-2017-0005 Magnetic Characterization of Organic Materials Dongho Kim YONSEI UNIVERSITY UNIVERSITY-INDUSTRY FOUNDATION Final Report 12...Final 3. DATES COVERED (From - To) 10 Sep 2015 to 09 Sep 2016 4. TITLE AND SUBTITLE Magnetic Characterization of Organic Materials 5a.  CONTRACT

  6. 76 FR 52253 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... FERC ] 61,033, at P 1, 7, 37. The Final Rule has a more complete discussion of the procedural history of this case. We will not reiterate that complete history here. 5. In response to the Final Rule... in this fashion, future contracts could be rewritten to achieve this end and we do not wish to open...

  7. Strategies for communicating quality expectations for environmental service contracts : final report.

    DOT National Transportation Integrated Search

    2017-03-01

    This study explores the communication of quality expectations between the Office of Environment Services (OES) and environmental consulting firms contributing to the Plan Development Process of the Georgia Department of Transportation (GDOT). The ove...

  8. Intelligent transportation systems (ITS) operational support contracts : final report.

    DOT National Transportation Integrated Search

    2005-01-31

    The New Jersey Department of Transportation (NJDOT) is currently facing a significant challenge : in keeping Intelligent Transportation Systems (ITS) at a high level of availability at the : Transportation Operation Center North (TOC North) and Trans...

  9. Early Deployment Of Atms/Atis For Metropolitan Detroit, Final Report

    DOT National Transportation Integrated Search

    1994-09-26

    TECHNOLOGY, ARCHITECTURE, CONTRACTING, AND DEPLOYMENT RECOMMENDATIONS RESULTING FROM THE STUDY ENABLE MDOT TO BEGIN SYSTEM DESIGN AND CONSTRUCTION. HOWEVER, IN ORDER TO DEMONSTRATE THE IMPLEMENTATION METHODS OF NEW ATMS/ATIS COMPONENTS AND SYSTEM ARC...

  10. Feasibility Study for Low Drag Acoustic Liners Final Report

    NASA Technical Reports Server (NTRS)

    Riedel, Brian; Wu, Jackie

    2017-01-01

    This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

  11. Spanish-English Verbatim Translation Exam. Final Report.

    ERIC Educational Resources Information Center

    Stansfield, Charles W.; And Others

    The development and validation of the Spanish-English Verbatim Translation Exam (SEVTE) is described. The test is for use by the Federal Bureau of Investigation (FBI) in the selection of applicants for the positions of Language Specialist or Contract Linguist. The report is divided into eight sections. Section 1 describes the need for the test,…

  12. Final report on technical work accomplished under contract NASw-2953

    NASA Technical Reports Server (NTRS)

    Fredricks, R. W.

    1977-01-01

    A report is given on the technical work accomplished in the area of plasma physics. The subjects covered are: (1) oblique whistler instabilities, (2) current-limited electron beam injection, (3) three-dimensional ion sound turbulence, (4) theoretical aspects of sounder antenna operation and (5) whistler modes in bow shock structures.

  13. Summary of Research on Education and the Rural-Urban Transformation. Final Report.

    ERIC Educational Resources Information Center

    Textor, Robert B.; And Others

    This monograph is the summary report of the "Education and the Rural-Urban Transformation" (ERUT) portion of the United States Office of Education research contract concerning "Content and Instructional Methods of Education for the Economic-Political-Social Development of Nations." The ERUT team conducted a continuing seminar throughout the…

  14. COST EFFECTIVE AND HIGH RESOLUTION SUBSURFACE CHARACTERIZATION USING HYDRAULIC TOMOGRAPHY

    DTIC Science & Technology

    2017-08-01

    FINAL REPORT Cost -Effective and High-Resolution Subsurface Characterization Using Hydraulic Tomography ESTCP Project ER-201212 AUGUST...This document has been cleared for public release Page Intentionally Left Blank This report was prepared under contract to the Department of...Defense Environmental Security Technology Certification Program (ESTCP). The publication of this report does not indicate endorsement by the Department

  15. A Computational Cluster for Multiscale Simulations of Ionic Liquids

    DTIC Science & Technology

    2008-09-16

    AND SUBTITLE DURIP: A Computational Cluster for Multiscale Simulations of Ionic Liquids 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA955007-1-0512 5c...AVAILABILITY STATEMENT ZO\\5oc\\\\%1>^ 13. SUPPLEMENTARY NOTES 14. ABSTRACT The focus of this project was to acquire and use computer cluster nodes...by ANSI Std. Z39.18 Adobe Professional 7.0 Comprehensive Final Report: Gregory A. Voth, PI Contract/Grant Title: DURIP: A Computational Cluster for

  16. NORSAR Basic Seismological Research

    DTIC Science & Technology

    1992-11-29

    addressee is no longer employed by your organization, please notify PL/TSI, Hanscom AF3 MA 01731-3010. This will assist us in maintaining a current mailing...distribution unlimited 13. ABSTRACT (Maximum 200 words) This Final Report describes the work accomplished under Cont-ract No . F49620-C-89- 0038...I D ’t A IiYS MjQA~ Pre face Under contract No . F49620-C-89-0038, NTNF/NORSAR has been conducting research within a wide range of subjects relevant to

  17. Innovative contracting practices for ITS : task E : final report

    DOT National Transportation Integrated Search

    1999-07-01

    The Peer Exchange is a process adopted by the Office of Motor Carrier and Highway Safety in which teams of professionals, representing state and federal government and private industry, identify effective commercial motor vehicle safety findings for ...

  18. In-vehicle crash avoidance warning systems : human factors considerations

    DOT National Transportation Integrated Search

    1997-02-01

    This document represents the final report of the work performed under contract DTNH22-91 C-07004, In-Vehicle Crash Avoidance Warning Systems: Human Factors Considerations. This project was performed to develop guidelines for the interface desig...

  19. Tampa Bay Area Integrated Transportation Information System, Final Report

    DOT National Transportation Integrated Search

    1993-09-01

    THE FLORIDA DEPARTMENT OF TRANSPORTATION ENTERED INTO A CONTRACT WITH THE UNIVERSITY OF SOUTH FLORIDA ON BEHALF OF THE CENTER FOR URBAN TRANSPORTATION RESEARCH (CUTR) TO DEVELOP AN ACTION PLAN FOR THE IMPLEMENTATION OF AN INTEGRATED TRANSPORTATION IN...

  20. Route 139 rehabilitation : Pulaski Skyway contract 2 : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    After being outside and exposed to the elements during many years of service, concrete and the reinforcement within begins to deteriorate and corrode, which affects the performance of concrete bridge balustrades, especially those built in the 1930...

  1. Bridge deck concrete volume change : final contract report.

    DOT National Transportation Integrated Search

    2010-02-01

    Concrete structures such as bridge decks, with large surface area relative to volume, shrink and crack, thus reducing service life performance and increasing operation costs. The project evaluated the early, first 24 hours, and long-term, 180 days, s...

  2. Space Transportation Systems Technologies

    NASA Technical Reports Server (NTRS)

    Laue, Jay H.

    2001-01-01

    This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.

  3. Engineered Muscle Actuators: Cells and Tissues

    DTIC Science & Technology

    2007-01-10

    tissue culture perfusion bioreactors The UNC group led the development of the final version of the integrated cell culture bioreactor . The system was...construct engineered in vitro from primary mammalian cells (C) The first demonstration of developmental improvements in engineered tendon constitutive...2007 Final Performance Report 1 Nov 2004 - 31 Oct 2006 4. TITLE AND SUBTITLE 5.. CONTRACT NUMBER Engineered Muscle Actuators: Cells and Tissues FA9550

  4. Super p53 for Treatment of Ovarian Cancer

    DTIC Science & Technology

    2017-09-01

    City, UT 84112 CONTRACTING ORGANIZATION: Salt Lake REPORT DATE: September 2017 TYPE OF REPORT : Final PREPARED FOR: U.S. Army Medical Research...views, opinions and/or findings contained in this report are those of the author(s) and should not be construed as an official Department of the Army...position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public

  5. Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James, Brian David; Huya-Kouadio, Jennie Moton; Houchins, Cassidy

    This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

  6. Dynamic Resectorization and Coordination Technology: An Evaluation of Air Traffic Control Complexity

    NASA Technical Reports Server (NTRS)

    Brinton, Christopher R.

    1996-01-01

    The work described in this report is done under contract with the National Aeronautics and Space Administration (NASA) to support the Advanced Air Transportation Technology (AATR) program. The goal of this program is to contribute to and accelerate progress in Advanced Air Transportation Technologies. Wyndemere Incorporated is supporting this goal by studying the complexity of the Air Traffic Specialist's role in maintaining the safety of the Air Transportation system. It is envisioned that the implementation of Free Flight may significantly increase the complexity and difficulty of maintaining this safety. Wyndemere Incorporated is researching potential methods to reduce this complexity. This is the final report for the contract.

  7. Collaborative Model for Acceleration of Individualized Therapy of Colon Cancer

    DTIC Science & Technology

    2015-12-01

    preclinical models are representative of actual patient samples and may be useful in early drug development and predictive biomarker discovery...Award Number: W81XWH-11-1-0527 TITLE: Collaborative Model for Acceleration of Individualized Therapy of Colon Cancer PRINCIPAL INVESTIGATOR: Aik...Choon Tan CONTRACTING ORGANIZATION: UNIVERSITY OF COLORADO, DENVER AURORA, CO 80045-2505 REPORT DATE: December 2015 TYPE OF REPORT: FINAL REPORT

  8. Imaging Prostatic Lipids to Distinguish Aggressive Prostate Cancer

    DTIC Science & Technology

    2016-12-01

    Shannon, PhD CONTRACTING ORGANIZATION: Oregon Health & Science University Portland, OR 97239-3098 REPORT DATE: December 2016 TYPE OF REPORT: FINAL...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Oregon Health & Science University 3181 SW S AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER SW Sam...our current work to determine the association between fatty acid synthase (FAS) overexpression and intraprostatic fat as measured by in-vivo imaging

  9. RNAi Mediated Silencing of LRRK2G2019S in Parkinson’s Disease

    DTIC Science & Technology

    2013-08-01

    CONTRACTING ORGANIZATION : Georgetown University Medical Center Washington DC 20057-2197 REPORT DATE: August 2013 TYPE OF REPORT: Final Option...georgetown.edu, xs37@georgetown.edu 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Georgetown University Medical...Center 8. PERFORMING ORGANIZATION REPORT NUMBER Washington DC 20057- 2197 9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS

  10. Final Report for Contract N00014-89-J-3047 (Yale University)

    DTIC Science & Technology

    1992-06-30

    REPORTING PERIOD: 1 July 1989 - 30 June 1992 QOJCTI: To determine the transmission dynamics of cnidarian allorecognition using standard breeding...These results essentially obviate all prior interpretations of the genetics of cnidarian allorecognition as grossly oversimplified. In addition, the...laboratory has (see references below) (1) reported the first homeoboxes from cnidarians , (2) used mtDNA conformation to demonstrate that Anthozoa are the

  11. Development of a maintenance cost index : final project report.

    DOT National Transportation Integrated Search

    2016-08-15

    Maintenance activities account for a substantial portion of the life cycle costs of a roadway and are categorized by means of performance: contract maintenance by outside forces or in-house maintenance by DOT personnel and equipment. The nature and t...

  12. A high school is supplied with solar energy--Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

  13. Evaluation of TRIMARC procurement procedures : final report.

    DOT National Transportation Integrated Search

    2001-06-01

    The objective of this study was to evaluate the effectiveness and success of the TRIMARC project including the SEP-14 process. The overall project has been received the positively and the contract is now being extended to include a larger incident ma...

  14. Final Report on Oxygen Plant Development (Employing Regenerative Chemicals)

    DTIC Science & Technology

    1945-05-31

    Furn:t3 at NDRC Washington Office, May 25, 1942. Air Transported or^t (P- S ) JJ. W. Kellogg Company letter from Walter E. Lobo to C. C. Furnas at...Chemjcalfl) la National Defense Reaearcft fonmimfe.e, Ely. The M. ff. Kellogg Company Contract t’lo. OEM-sr-565 And American Machine Defense...Corporation Contract No. OEM-sr-499 Submitted by» Walter G. Lot for The M. 1». Kellogg Company March 16, 1945 ß;&*e&’ OCCM3, C. Bockius for

  15. Hemoglobin Function and Red Cell Metabolism in Stored Blood

    DTIC Science & Technology

    1988-04-01

    but still worsen ATP maintenance relative to the CPD-A control. Ascorbate (or vitamin C ), at a 10 mM concentration, maintains near normal 2,3-DPG...ORGANIZATION U.S. Army Medical (if applicable) Research & Development Command Contract No. DADAI7-72- C -2005 8c. ADDRESS(City, State, and ZIP Code) 10- SOURCE OF...ATTENTION OF SGRD-RMI-S SUBJECT: Review of Draft Final Report, April 1, 1988, for Contract No. DADAI7-72- C -2005 Ben R. Dawson, M.D. University of

  16. Synthesis of Cubane Based Energetic Molecules

    DTIC Science & Technology

    1993-04-13

    Judahi Goldwasser Code 1132P Contract No. N00014-86-C-0699 93 08590 SRI Project Number 2723 93,08590 David S. Ross, Director 7) Chemistry Laborator David...1132p 800 N. Quincy St. Arlinston. VA 22217-5000 11. SUPPLEMENTARY NOTES Final Project Report 12a. DISTRIIUTION/AVAJLABIL[TY STATEMENT 12b. DISTRIBU71ION...course of our studies here and in a parallel ONR sponsored program (SRI project number 6654, ONR contract No. N00014-88-C-0537), we discovered and

  17. Final Report of Work Done on Contract NONR-4010(03).

    ERIC Educational Resources Information Center

    Chapanis, Alphonse

    The 24 papers listed report the findings of a study funded by the Office of Naval Research. The study concentrated on the sensory and cognitive factors in man-machine interfaces. The papers are categorized into three groups: perception studies, human engineering studies, and methodological papers. A brief summary of the most noteworthy findings in…

  18. Automatic Oscillating Turret.

    DTIC Science & Technology

    1981-03-01

    Final Report: February 1978 ZAUTOMATIC OSCILLATING TURRET SYSTEM September 1980 * 6. PERFORMING 01G. REPORT NUMBER .J7. AUTHOR(S) S. CONTRACT OR GRANT...o....e.... *24 APPENDIX P-4 OSCILLATING BUMPER TURRET ...................... 25 A. DESCRIPTION 1. Turret Controls ...Other criteria requirements were: 1. Turret controls inside cab. 2. Automatic oscillation with fixed elevation to range from 20* below the horizontal to

  19. Optimization of Biofuel Production From Transgenic Microalgae

    DTIC Science & Technology

    2013-02-27

    AFRL-OSR-VA-TR-2013-0145 OPTIMIZATION OF BIOFUEL PRODUCTION FROM TRANSGENIC MICROALGAE Richard Sayre Donald Danforth...Technical 20080815 to 20120630 OPTIMIZATION OF BIOFUEL PRODUCTION FROM TRANSGENIC MICROALGAE FA9550-08-1-0451 Richard Sayre Donald Danforth Plant...BIOFUEL PRODUCTION FROM TRANSGENIC MICROALGAE Grant/Contract Number: FA9550-08-1-0451 Reporting Period: Final Report Abstract: We have compared the

  20. Camp Verde Adult Reading Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Maynard, David A.

    This document begins with a four-page performance report describing how the Camp Verde Adult Reading Program site was relocated to the Community Center Complex, and the Town Council contracted directly with the Friends of the Camp Verde Library to provide for the requirements of the program. The U.S. Department of Education grant allowed the…

  1. 42 CFR 417.576 - Final settlement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... end of each contract period, unless CMS extends the period for good cause shown by the HMO or CMP. (2... by common ownership or control; and (B) For reports for cost-reporting periods that begin on or after... CMP or related to the HMO or CMP by common ownership or control and that provides services to the HMO...

  2. Evaluation Report of the Course for Distance Education Policy-Makers in Southern Africa. Final Report

    ERIC Educational Resources Information Center

    Magagula, Cisco

    2002-01-01

    The evaluator was contracted to determine whether the online or face-to-face course components met course participants' needs and increased their understanding and knowledge of policy development processes, and to determine the efficiency and effectiveness of delivery strategies. In addition, the course evaluator was asked to look at the…

  3. Developing Inhibitors of Ovarian Cancer Progression by Targeted Disruption of the Gamma-Synuclein Activated Migratory and Survival Signaling Pathways

    DTIC Science & Technology

    2007-04-01

    Golub TR. A molecular signature of metastasis in primary solid tumors. Nat Gene 2003;33:49–54. 2. van’t Verr LJ, Dai H, van de Vijver MJ, et al. Gene...Philadelphia, Pennsylvania 19111 REPORT DATE: April 2007 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and... TYPE Final 3. DATES COVERED (From - To) 1 Apr 2003 – 31 Mar 2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Developing Inhibitors of Ovarian

  4. Future Aeronautical Communication Infrastructure Technology Investigation

    NASA Technical Reports Server (NTRS)

    Gilbert, Tricia; Jin, Jenny; Bergerm Jason; Henriksen, Steven

    2008-01-01

    This National Aeronautics and Space Administration (NASA) Contractor Report summarizes and documents the work performed to investigate technologies that could support long-term aeronautical mobile communications operating concepts for air traffic management (ATM) in the timeframe of 2020 and beyond, and includes the associated findings and recommendations made by ITT Corporation and NASA Glenn Research Center to the Federal Aviation Administration (FAA). The work was completed as the final phase of a multiyear NASA contract in support of the Future Communication Study (FCS), a cooperative research and development program of the United States FAA, NASA, and EUROCONTROL. This final report focuses on an assessment of final five candidate technologies, and also provides an overview of the entire technology assessment process, including final recommendations.

  5. MM T for linear resonant cooler. Volume 1. Final report, October 1984-September 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narayan, R.; Silvestro, J.

    1988-02-16

    The three-fold objectives of this contract were to: (1) enhance the producibility and performance of the prototype cooler design developed in a prior contract, (b) qualify the design to the target specification in the contract (basically the HD1045/UA B2 specification amended for 2,500 hour MTTF and low audible noise), and (c) develop and demonstrate a pilot production facility for the cooler. Technical difficulties and cost growth related to objectives (a) and (b) above precluded accomplishing (c) as part of this contract's activities. Nevertheless, performance within or exceeding all major requirements has been demonstrated, and the company is currently producing themore » cooler for use on a U.S. Air Force airborne IR system.« less

  6. Mountain Terrain Atmospheric Modeling and Observations (MATERHORN) Program

    DTIC Science & Technology

    2017-05-09

    resolution land-surface data with comparison to observations . These will be extended to higher resolution with the immersed boundary method when...To) 09/05/2017 Final 1 Jun 1 1 to 30 May 17 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Mountain Terrain Atmospheric Modeling and Observations ...OF NOTRE DAME DU LAC REPORT NUMBER RESEARCH AND SPONSORED PROGRAMS Final 940 GRACE HALL NOTRE DAME, IN 46556-5602 9. SPONSORING/MONITORING AGENCY

  7. Final Environmental Assessment for Low-Level Flight Testing, Evaluation, and Training, Edwards Air Force Base

    DTIC Science & Technology

    2005-05-01

    4. TITLE AND SUBTITLE Final Environmental Assessment for Low-Level Flight Testing, Evaluation, and Training, Edwards Air Force Base 5a. CONTRACT...NAME(S) AND ADDRESS(ES) Air Force Flight Test Center,Environmental Management Directorate,Edwards AFB,CA,93524 8. PERFORMING ORGANIZATION REPORT...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT The U.S. Air Force Flight Test

  8. Connected Vehicle Pilot Deployment Program phase 1 : partnership status summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the process and status of developing and implementing agreements, contracts and subcontracts among partner organizations in the New York City Connected Vehicle Pilot Deployment (NYC CVPD). Details include the work elements as ...

  9. Pavement warranty program in Wisconsin : 12-year evaluation, final report, June 2009.

    DOT National Transportation Integrated Search

    2009-06-01

    The Wisconsin Department of Transportation (WisDOT) first used pavement warranties in 1995. The intent of this study was to compare performance and cost data for WisDOT pavements constructed under warranty and standard contracts to determine the cost...

  10. Final contract report : real-time EMS helicopter video feasibility study

    DOT National Transportation Integrated Search

    2001-11-01

    The purpose of this project was to determine whether the use of ground-based video imaging by local rescue squad personnel and Pegasus medical staff is technically and organizationally feasible as a tool to improve pre-hospital care provided to crash...

  11. Symbiotic Optimization of Behavior

    DTIC Science & Technology

    2015-05-01

    SYMBIOTIC OPTIMIZATION OF BEHAVIOR UNIVERSITY OF WASHINGTON MAY 2015 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED...2014 4. TITLE AND SUBTITLE SYMBIOTIC OPTIMIZATION OF BEHAVIOR 5a. CONTRACT NUMBER FA8750-12-1-0304 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT

  12. Intrusion Detection System Visualization of Network Alerts

    DTIC Science & Technology

    2010-07-01

    Intrusion Detection System Visualization of Network Alerts Dolores M. Zage and Wayne M. Zage Ball State University Final Report July 2010...contracts. Staff Wayne Zage, Director of the S2ERC and Professor, Department of Computer Science, Ball State University Dolores Zage, Research

  13. Geospace Plasma Dynamics

    DTIC Science & Technology

    2013-05-22

    DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response...control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1 . REPORT DATE (DD-MM-YYYY) 22-05-2013 2. REPORT TYPE Final Report 3. DATES...COVERED (From - To) 1 Oct 2007 to 30 Sep 2012 4. TITLE AND SUBTITLE Geospace Plasma Dynamics 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c

  14. Targeting Siah2 as Novel Therapy for Metastatic Prostate Cancer

    DTIC Science & Technology

    2017-12-01

    CONTRACTING ORGANIZATION: Cedars-Sinai Medical Center Los Angeles, CA 90048 REPORT DATE: December 2017 TYPE OF REPORT : Final PREPARED FOR: U.S. Army...unlimited. The views, opinions and/or findings contained in this report are those of the author(s) and should not be construed as an official...Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188

  15. Salivary Proteomic and MicroRNA Biomarkers Development for Lung Cancer Detection

    DTIC Science & Technology

    2016-10-01

    David T. Wong, DMD, DMSc CONTRACTING ORGANIZATION : University of California, Los Angeles Los Angeles, CA 90095 REPORT DATE: October 2016 TYPE OF...REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION . 1. REPORT DATE (DD-MM-YYYY) October 31, 2016 2. REPORT

  16. Modulation of Adhesion Molecule Expression on Prostate Tumor Cells after Co-Culture with Eosinophilic Cell Lines

    DTIC Science & Technology

    2001-10-01

    CONTRACTING ORGANIZATION: Howard University Washington, DC 20059 REPORT DATE: October 2001 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical...RIGHTS LEGEND Award Number: DAMD17-98-1-8485 Organization: Howard University Those portions of the technical data contained in this report marked as...Ph.D. 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) S. PERFORMING ORGANIZATION REPORT NUMBER Howard University Washington, DC 20059 E-mail

  17. 48 CFR 49.303-5 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final settlement. 49.303-5 Section 49.303-5 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  18. Nicotine Effects on the Impact of Stress

    DTIC Science & Technology

    2016-03-01

    CONTRACTING ORGANIZATION: McLean Hospital Belmont, MA 02478 REPORT DATE: March 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research...Hospital AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER 115 Mill Street Belmont, MA 02478 9. SPONSORING / MONITORING AGENCY NAME(S) AND...conditioned stimulus; CS) co-terminating with a 0.5-sec 0.6 mA footshock. Two different patterns of post-training nicotine intake were examined: for

  19. Targeted Radiation Therapy for Cancer Initiative

    DTIC Science & Technology

    2017-11-01

    CONTRACTING ORGANIZATION: The Geneva Foundation, Tacoma, WA 98402 REPORT DATE: November 2017 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical ...MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12...Localization System will help to spare toxicity to the heart, 4) a military medical center department, with essentially fixed costs, may feasibly apply advanced

  20. The Role of SIRT1 In Breast Cancer Stem Cells

    DTIC Science & Technology

    2016-09-01

    CONTRACTING ORGANIZATION: UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER HOUSTON, TX 77030-5400 REPORT DATE: September 2016 TYPE OF REPORT: Final...AND ADDRESS(ES) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER University of Texas Health Science center 7000 Fannin St FL2 Houston, TX...collaboration with Dr. Eva Sevick at the image core center, Institution of Molecular Medicine at UTHSC at Houston. A mammary fat pad cell injection was

  1. Reforming the Joint Military Establishment

    DTIC Science & Technology

    1985-06-01

    FOR PUBLIC RELEASE DISTRIBUTION UNLIMITED D UNCLASSIFIED StCURITV CLASJiriCATIOM OP THIS PAOK (*h*> Dmf Enltfd) REPORT DOCUMENTATION PAGE 1...COMPLETING FORM i Rt t lRNT’S CATALOG NUMBER 5. TYPE OF HEBORT 4 PCRIOC COVCRCO Final S. PERFORMING ORO. REPORT NUMICR B. CONTRACT OR GRANT...NUMBERft; 10. PROGRAM ELCMENT. PROJECT, TASK AREA ft WORK UNIT NUMBERS U. REPORT OAT1 June 1985 𔃽. NUMBER OF PAGES 78 IS. SECURITY CLASS

  2. Structural Damage Prediction and Analysis for Hypervelocity Impact. BUMPERII Suggestion and Problem Reports

    NASA Technical Reports Server (NTRS)

    1995-01-01

    In the course of preparing the SD_SURF space debris analysis code, several problems and possibilities for improvement of the BUMPERII code were documented and sent to MSFC. These suggestions and problem reports are included here as a part of the contract final report. This includes reducing BUMPERII memory requirements, compiling problems with BUMPERII, FORTRAN-lint analysis of BUMPERII, and error in function PRV in BUMPERII.

  3. Establishing the Reliability and Validity of the Perceptions of Flight Operations Quality Assurance (PFOQA) Questionnaire

    DTIC Science & Technology

    2011-04-01

    Elaine M. Pfleiderer Thomas R. Chidester Civil Aerospace Medical Institute Federal Aviation Administration Oklahoma City, OK 73125 April 2011 Final...Aerospace Medical Institute’s publications Web site: www.faa.gov/library/reports/ medical /oamtechreports i Technical Report Documentation Page 1. Report...Work Unit No. (TRAIS) FAA Civil Aerospace Medical Institute P.O. Box 25082 11. Contract or Grant No. Oklahoma City, OK 73125

  4. Communication Platform Payload Definition (CPPD) study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hunter, E. M.

    1986-01-01

    This is Volume 1 (Executive Summary) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  5. Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum

    NASA Technical Reports Server (NTRS)

    Hunter, E. M.; Driggers, T.; Jorasch, R.

    1986-01-01

    This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  6. Sodium sulfur electric vehicle battery engineering program final report, September 2, 1986--June 15, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-06-01

    In September 1986 a contract was signed between Chloride Silent Power Limited (CSPL) and Sandia National Laboratories (SNL) entitled ``Sodium Sulfur Electric Vehicle Battery Engineering Program``. The aim of the cost shared program was to advance the state of the art of sodium sulfur batteries for electric vehicle propulsion. Initially, the work statement was non-specific in regard to the vehicle to be used as the design and test platform. Under a separate contract with the DOE, Ford Motor Company was designing an advanced electric vehicle drive system. This program, called the ETX II, used a modified Aerostar van for itsmore » platform. In 1987, the ETX II vehicle was adopted for the purposes of this contract. This report details the development and testing of a series of battery designs and concepts which led to the testing, in the US, of three substantial battery deliverables.« less

  7. 48 CFR 1542.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 1542.705 Section 1542.705 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 1542.705 Final indirect cost rates. (a) The... contracts when the Environmental Protection Agency (EPA) is the cognizant federal agency and a FACO will be...

  8. Impacts of a Violence Prevention Program for Middle Schools: Findings after 3 Years of Implementation. NCEE 2011-4017

    ERIC Educational Resources Information Center

    Silvia, Suyapa; Blitstein, Jonathan; Williams, Jason; Ringwalt, Chris; Dusenbury, Linda; Hansen, William

    2011-01-01

    This is the second and final report summarizing findings from an impact evaluation of a violence prevention intervention for middle schools. This report provides findings from the second and third years of the 3-year intervention. The U.S. Department of Education (ED) contracted with RTI International and its subcontractors, Pacific Institute for…

  9. HEAT Sensor: Harsh Environment Adaptable Thermionic Sensor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Limb, Scott J.

    2016-05-31

    This document is the final report for the “HARSH ENVIRONMENT ADAPTABLE THERMIONIC SENSOR” project under NETL’s Crosscutting contract DE-FE0013062. This report addresses sensors that can be made with thermionic thin films along with the required high temperature hermetic packaging process. These sensors can be placed in harsh high temperature environments and potentially be wireless and self-powered.

  10. Optic Glomeruli: Biological Circuits that Compute Target Identity

    DTIC Science & Technology

    2013-11-01

    vitripennis. Insect Mol. Biol. Suppl. 1:121-36. Strausfeld NJ. 2012. Arthropod Brains. Evolution , Functional Elegance and Historical Significance. Harvard...Neuroscience and Center for Insect Science University of Arizona Tucson, AZ 85721 Contract No. FA8651-10-1-0001 November 2013 FINAL REPORT...PERFORMING ORGANIZATION REPORT NUMBER Department of Neuroscience and Center for Insect Science University of Arizona Tucson, AZ 85721

  11. Graduate Credit Needs Assessment for Western Washington University Contract Trainings in the Division of Economic and Medical Field Services. [Final Report.

    ERIC Educational Resources Information Center

    Zeretzke, Dale

    This report presents results of a survey of 354 Economic and Medical Field Services (EMFS) division social workers in Washington State. The survey investigated their needs for graduate level academic credit from professional training provided by Western Washington University (WWU), as well as matters of credit utility and institutional and…

  12. 48 CFR 31.203 - Indirect costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... fiscal year used for financial reporting purposes in accordance with generally accepted accounting... contract or other work, indirect costs are those remaining to be allocated to intermediate or two or more... basis of the benefits accruing to intermediate and final cost objectives. When substantially the same...

  13. Goodyear aerospace conceptual design maritime patrol airship ZP3G. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, N.D.

    1979-04-01

    A Conceptual design of a modern technology airship with precision hover capability for use in maritime patrol is described. The size and major characteristics are established by a series of United States Coast Guard missions set forth by the contracting agency.

  14. Feasibility of remotely manipulated welding in space: A step in the development of novel joining technologies

    NASA Technical Reports Server (NTRS)

    Masubuchi, K.; Agapakis, J. E.; Debiccari, A.; Vonalt, C.

    1985-01-01

    A six month research program entitled Feasibility of Remotely Manipulated Welding in Space - A Step in the Development of Novel Joining Technologies is performed at the Massachusetts Institute of Technology for the Office of Space Science and Applications, NASA, under Contract No. NASW-3740. The work is performed as a part of the Innovative Utilization of the Space Station Program. The final report from M.I.T. was issued in September 1983. This paper presents a summary of the work performed under this contract. The objective of this research program is to initiate research for the development of packaged, remotely controlled welding systems for space construction and repair. The research effort includes the following tasks: (1) identification of probable joining tasks in space; (2) identification of required levels of automation in space welding tasks; (3) development of novel space welding concepts; (4) development of recommended future studies; and (5) preparation of the final report.

  15. 76 FR 53719 - Nondisplacement of Qualified Workers Under Service Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...In this final rule, the Department of Labor (Department or DOL) issues final regulations to implement Executive Order 13495, Nondisplacement of Qualified Workers Under Service Contracts. The Executive Order establishes a general policy of the Federal Government concerning service contracts and solicitations for service contracts for performance of the same or similar services at the same location. This policy mandates the inclusion of a contract clause requiring the successor contractor and its subcontractors to offer those employees employed under the predecessor contract, whose employment will be otherwise terminated as a result of the award of the successor contract, a right of first refusal of employment under the successor contract in positions for which they are qualified.

  16. Energy conservation in coal conversion. Final report, September 15, 1977--September 1, 1978. Selected case studies and conservation methodologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Purcupile, J.C.

    The purpose of this study is to apply the methodologies developed in the Energy Conservation in Coal Conversion August, 1977 Progress Report - Contract No. EY77S024196 - to an energy efficient, near-term coal conversion process design, and to develop additional, general techniques for studying energy conservation and utilization in coal conversion processes. The process selected for study was the Ralph M. Parsons Company of Pasadena, California ''Oil/Gas Complex, Conceptual Design/Economic Analysis'' as described in R and D Report No. 114 - Interim Report No. 4, published March, 1977, ERDA Contract No. E(49-18)-1975. Thirteen papers representing possible alternative methods of energymore » conservation or waste heat utilization have been entered individually into EDB and ERA. (LTN)« less

  17. Cultural Resources Management Plan: Coralville Lake, Iowa.

    DTIC Science & Technology

    1987-05-01

    7 iAlf now* E-* ILA’AUKEE -.WlSCCqSIN -. THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA - FINAL CULTURAL RESOURCES MANAGEMENT PLAN Prepared By...2004 In Fulfillment of: Contract No. DACW25-86-C-0036 May 1987 (A -P. 7V. V T This report entitled, "The Archaeology of Coralville Lake, Iowa - Final...various studies include survey, testing, and geomorphic investigations. "The Archaeology of Coralville Lake, Iowa - Landscape Evolution" presents the

  18. Community Noise Exposure Resulting from Aircraft Operations: Technical Review

    DTIC Science & Technology

    1974-11-01

    REPORT DOCUMENTATION PAGE I. REPORT NÜSTER AMRL-TR-73-106 2. OOVT ACCESSION NO 4. TITLE («a* SuHttl,) COMMUNITY NOISE EXPOSURE RESULTING FROM...INSTRUCTIONS BEFORE COMPLETING FORM 1. REClPlfcNT’i CATALOG NUMBER rr.t/j i S. TVP|tOF REPORT * PERIOO COVERED final report • PERFORMING ORC... REPORT NUMBER 2581 I. CONTRACT OR OR ANT NUMBERf«) F-33615-73-C-4160 10. PROGRAM ELEMENT, PROJECT, TASK AREA * WORK UNIT NUMBERS 62202F

  19. Spatial Relationships of Auroral Particle Acceleration Relative to High Latitude Plasma Boundaries

    NASA Technical Reports Server (NTRS)

    Ghielmetti, Arthur G.

    1997-01-01

    This final report describes the activities under NASA contract to Lockheed Missiles and Space Company. It covers the period from 10-1-94 to 12-31-97. The objective of this investigation is to identify and characterize the spatial relationships of auroral particle acceleration features relative to the characteristic transition features in the surrounding polar ionospheric plasmas. Due to the reduced funding level approved for this contract, the original scope of the proposed work was readjusted with the focus placed on examining spatial relationships with respect to particle structures.

  20. Technology Insertion-Engineering Services Process Characterization. Task Order No. 1. Book 2 of 5. Database Documentation Book. OO-ALC MANPRA (C5 Main Landing Gear - WCD’S)

    DTIC Science & Technology

    1989-12-15

    ORDER NO. 1 BOOK 2 OF 5 DATABASE DOCUMENTATION BOOK 00-ALC MANPRA *(C5 MAIN LANDING GEAR- WCD’S) CONTRACT SUMMARY REPORT , 15 DECEMBER 1989 ’.1 - CONTRACT...ORIQ 1 . T A 1~4 M E* X C I" El 1 -:11 E:XCE:EI:IIE:U RE:CORI’ RFiS CvAUiS FOREXE IN REWORK LI[MITS Ill FINAL DESTINATION 22. COOROINATION/INITIATING MCC

  1. Development of a decision model for selection of appropriate timely delivery techniques for highway projects : final report, April 2009.

    DOT National Transportation Integrated Search

    2009-04-01

    The primary umbrella method used by the Oregon Department of Transportation (ODOT) to ensure on-time performance in standard construction contracting is liquidated damages. The assessment value is usually a matter of some judgment. In practice,...

  2. Electrodynamic Tether Operations and Control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    2001-01-01

    This Final Report is organized by tasks from the statement of work (SOW). A brief statement of each task with its task description followed by a discussion of the work performed is presented. The period of performance for this contract phase was from July 21, 2000 to March 19, 2001.

  3. Final Report of Research Accomplishments under Contract N00014-85-K-0150 (Michigan State University)

    DTIC Science & Technology

    1991-03-31

    doubtless exist and must be sought. A new Steinhaus Center is starting in Wrockaw with contacts at several U.S. universities. Research on stable processes will also be high on the agenda for this group headed by Dr. A. Weron.

  4. Crash testing of Louisiana's 3 1/2" diameter multi-directional, single steel post, small sign support : final report.

    DOT National Transportation Integrated Search

    1993-03-01

    The Louisiana Department of Transportation and Development (LDOTD) contracted with the Texas Transportation Institute (TTI) to evaluate the impact characteristics of Louisiana's multi-directional, 8.9 cm (3-1/2 in) diameter steel post, small sigh sup...

  5. 78 FR 64574 - Grant Guideline, Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ..., no more than two of the same political party. Through the award of grants, contracts, and cooperative... certified audit report. For purposes of this requirement, ``current'' means no earlier than two years prior... funds. In addition, the budget should provide for submission of two copies of the consultant's final...

  6. Impact of the ovarian microenvironment on serous cancer

    DTIC Science & Technology

    2017-10-01

    CONTRACTING ORGANIZATION : University of Illinois at Chicago Chicago, IL 60607-4067 REPORT DATE: October 2017 TYPE OF REPORT: Final PREPARED FOR: U.S. Army...AUTHOR(S) Joanna E. Burdette 5d. PROJECT NUMBER 5e. TASK NUMBER EMAIL joannab@uic.edu 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S...AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER University of Illinois at Chicago 809 S. Marshfield, Room 520 Chicago IL 60612 9. SPONSORING

  7. Microelectronics Status Analysis and Secondary Part Procureability Assessment of the THAAD Weapon System

    DTIC Science & Technology

    1999-10-01

    Technical Report 5-20448 & 5- 20449 Contract No. DAAH01-98-D-R001 Delivery Order No. 34 Microelectronics Status Analysis and Secondary Part...Procureability Assessment of the THAAD Weapon System. (5-20448 & 5- 20449 ) Final Technical Report for Period 21 January 1999 through 30 September 1999...Huntsville Huntsville, AL 35899 5. FUNDING NUMBERS 8. PERFORMING ORGANIZATION REPORT NUMBER 5-20448 & 5- 20449 9. SPONSORING/MONITORING AGENCY

  8. Genetic and Epigenetic Determinants of Lung Cancer Subtype: Adenocarcinoma to Small Cell Conversion

    DTIC Science & Technology

    2016-10-01

    PRINCIPAL INVESTIGATOR: Charles M. Rudin, MD PhD CONTRACTING ORGANIZATION: Sloan Kettering Institute for Cancer Research New York, NY 10065 REPORT DATE...October 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION...ORGANIZATION REPORT NUMBER Sloan Kettering Institute for Cancer Research 1275 York Avenue New York, NY 10065-6007 9. SPONSORING / MONITORING AGENCY NAME(S

  9. Demonstration of Energy Savings in Commercial Buildings for Tiered Trim and Respond Method in Resetting Static Pressure for VAV Systems

    DTIC Science & Technology

    2017-03-01

    FINAL REPORT Demonstration of Energy Savings in Commercial Buildings for Tiered Trim and Respond Method in Resetting Static Pressure for VAV...release Page Intentionally Left Blank This report was prepared under contract to the Department of Defense Environmental Security Technology...Certification Program (ESTCP). The publication of this report does not indicate endorsement by the Department of Defense, nor should the contents be

  10. Moses Lake Fishery Restoration Project; Factors Affecting the Recreational Fishery in Moses Lake Washington, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgess, Dave

    2003-11-01

    This annual report is a precursor to the final technical report we will be writing the next contract period. Consequently, this report, covering the period between September 27, 2002, and September 26, 2003, represents a progress report towards the final technical report we anticipate completing by September 26, 2004. Sample analysis and field work have progressed well and we anticipate no further delays. There are 4 objectives: (1) To quantify secondary production Moses Lake; (2) To quantify the influence of predation on target fishes in Moses Lake; (3) To quantify mortality of selected fished in Moses Lake; and (4) Tomore » assess effects of habitat changes from shoreline development and carp on the fish community in Moses Lake.« less

  11. NASA's Lunar Robotic Architecture Study

    NASA Astrophysics Data System (ADS)

    Mulville, Daniel R.

    2006-07-01

    This report documents the findings and analysis of a 60-day agency-wide Lunar Robotic Architecture Study (LRAS) conducted by the National Aeronautics and Space Administration (NASA). Work on this study began in January 2006. Its purpose was to: Define a lunar robotics architecture by addressing the following issues: 1) Do we need robotic missions at all? If so, why and under what conditions? 2) How would they be accomplished and at what cost? Are they within budget? 3) What are the minimum requirements? What is the minimum mission set? 4) Integrate these elements together to show a viable robotic architecture. 5) Establish a strategic framework for a lunar robotics program. The LRAS Final Report presents analysis and recommendations concerning potential approaches related to NASA s implementation of the President's Vision for Space Exploration. Project and contract requirements will likely be derived in part from the LRAS analysis and recommendations contained herein, but these do not represent a set of project or contract requirements and are not binding on the U.S. Government unless and until they are formally and expressly adopted as such. Details of any recommendations offered by the LRAS Final Report will be translated into implementation requirements. Moreover, the report represents the assessments and projects of the report s authors at the time it was prepared; it is anticipated that the concepts in this report will be analyzed further and refined. By the time some of the activities addressed in this report are implemented, certain assumptions on which the report s conclusions are based will likely evolve as a result of this analysis. Accordingly, NASA, and any entity under contract with NASA, should not use the information in this report for final project direction. Since the conclusion of this study, there have been various changes to the Agency's current portfolio of lunar robotic precursor activities. First, the Robotic Lunar Exploration Program (RLEP) has been renamed the Lunar Precursor and Robotic Program (LPRP). On May 17, 2006, the Lunar Reconnaissance Orbiter (LRO) was confirmed to enter its implementation phase. Last, a new low-cost secondary payload known as the Lunar Crater Observation and Sensing Satellite (LCROSS) was co-manifested to launch with LRO in 2008. These changes are consistent with the conclusions and recommendations of this study, but came too late to be specifically reflected in this report.

  12. NASA's Lunar Robotic Architecture Study. Volume 1

    NASA Technical Reports Server (NTRS)

    Mulville, Daniel R.

    2006-01-01

    This report documents the findings and analysis of a 60-day agency-wide Lunar Robotic Architecture Study (LRAS) conducted by the National Aeronautics and Space Administration (NASA). Work on this study began in January 2006. Its purpose was to: Define a lunar robotics architecture by addressing the following issues: 1) Do we need robotic missions at all? If so, why and under what conditions? 2) How would they be accomplished and at what cost? Are they within budget? 3) What are the minimum requirements? What is the minimum mission set? 4) Integrate these elements together to show a viable robotic architecture. 5) Establish a strategic framework for a lunar robotics program. The LRAS Final Report presents analysis and recommendations concerning potential approaches related to NASA s implementation of the President's Vision for Space Exploration. Project and contract requirements will likely be derived in part from the LRAS analysis and recommendations contained herein, but these do not represent a set of project or contract requirements and are not binding on the U.S. Government unless and until they are formally and expressly adopted as such. Details of any recommendations offered by the LRAS Final Report will be translated into implementation requirements. Moreover, the report represents the assessments and projects of the report s authors at the time it was prepared; it is anticipated that the concepts in this report will be analyzed further and refined. By the time some of the activities addressed in this report are implemented, certain assumptions on which the report s conclusions are based will likely evolve as a result of this analysis. Accordingly, NASA, and any entity under contract with NASA, should not use the information in this report for final project direction. Since the conclusion of this study, there have been various changes to the Agency's current portfolio of lunar robotic precursor activities. First, the Robotic Lunar Exploration Program (RLEP) has been renamed the Lunar Precursor and Robotic Program (LPRP). On May 17, 2006, the Lunar Reconnaissance Orbiter (LRO) was confirmed to enter its implementation phase. Last, a new low-cost secondary payload known as the Lunar Crater Observation and Sensing Satellite (LCROSS) was co-manifested to launch with LRO in 2008. These changes are consistent with the conclusions and recommendations of this study, but came too late to be specifically reflected in this report.

  13. Semiconductor Phase Conjugation

    DTIC Science & Technology

    1992-05-01

    PL-TR--91- 1082 PL-TR-- AD-A253 684 91- 1082 SEMICONDUCTOR PHASE CONJUGATION lam-Choon Khoo Pennsylvania State University Electrical and Computer... 1082 This final report was prepared by Pennsylvania State University, University Park, Pennsylvania, under Contract F29601-88-K-0028, Job Order 33261B18...10. SPONSORING/ MONITORING AGENCY REPORT NUMBER Phill ips Laboratory PL-TR--91- 1082 Kirtland AFB, NM 87117-6008 11. SUPPLEMENTARY NOTES 12a

  14. Limited Scope Design Study for Multi-Sensor Towbody

    DTIC Science & Technology

    2016-06-01

    FINAL REPORT Limited Scope Design Study for Multi-Sensor Towbody SERDP Project MR-2501 JUNE 2016 Dr. Kevin Williams Tim McGinnis...prepared under contract to the Department of Defense Strategic Environmental Research and Development Program (SERDP). The publication of this...Left Blank REPORT DOCUMENTATION PAGE Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public

  15. Biological Synthesis of Substituted o-Aminophenols

    DTIC Science & Technology

    1991-02-01

    AMINOPHENOLS FINAL REPORT (November 1, 1987- December 31,1990) Work Performed Under Contract F49620-88-C-0016 Prepared for: I AIR FORCE OFFICE OF...Security Classification) Biological Synthesis of Substituted o- Aminophenols 12. PERSONAL AUTHOR(S) Dr. Terry K. Leib 13 . YP OF REPORT 3. TIME COVERED...0601 0706 high-temperature polymers, o- aminophenols , polvbenzoxazoles. 19. ABSTRACT (Continue on reverse if ne(essary and identify by block number

  16. The Economics of Counterinsurgency in the Philippines

    DTIC Science & Technology

    2017-01-01

    From- To) 24/01 /2017 Final Technical Report (UPDATED) June 2011 - June 2016 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER The Economics of...ORGANIZATION National Bureau of Economic Research, Inc. REPORT NUMBER 1050 Massachusetts Ave. Cambridge, MA 02138-5398 9. SPONSORING/MONITORING AGENCY NAME(S...14. ABSTRACT Economic activity can both induce and reduce political violence. We have shown that both insurgents and government respond to rising

  17. Land Combat Systems Industry. Industry Study, Spring 2009

    DTIC Science & Technology

    2009-01-01

    Spring 2009 Industry Study Final Report Land Combat Systems Industry The Industrial College of the Armed Forces...AND SUBTITLE Spring 2009. Industry Study. Land Combat Systems Industry 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6 . AUTHOR(S...Industrial College of the Armed Forces,Washington,DC,20319 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS

  18. NetView technical research

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  19. Low-Temperature Plasma Coating for Aluminum

    DTIC Science & Technology

    2001-03-01

    AFRL-ML-WP-TR-2001-4104 LOW-TEMPERATURE PLASMA COATING FOR ALUMINUM DR. HIROTSUGU YASUDA CENTER FOR SURFACE SCIENCE & PLASMA TECHNOLOGY...Date 00032001 Report Type N/A Dates Covered (from... to) - Title and Subtitle Low-Temperature Plasma Coating for Aluminum Contract Number...REPORT TYPE AND DATES COVERED Final, 6/29/1996 - 3/31/2001 4. TITLE AND SUBTITLE LOW-TEMPERATURE PLASMA COATING FOR ALUMINUM 5. FUNDING NUMBERS C

  20. Overcoming Space and Time Disadvantages in Joint Theater Missile Defense

    DTIC Science & Technology

    2002-02-04

    Disadvantages in Joint Theater Missile Defense (Unclassified) 9. Personal Authors: Major Robert Kelley 10.Type of Report: FINAL 11. Date of Report...Classification of This Page Unclassified NAVAL WAR COLLEGE Newport, RI Overcoming Space and Time Disadvantages in Joint Theater Missile Defense By Robert...Covered (from... to) - Title and Subtitle Overcoming Space and Time Disadvantages in Joint Theater Missile Defense Contract Number Grant Number

  1. A Discrete Latent State Approach to Diagnostic Testing. Final Report on Contract Number N00014-81-K-0564.

    ERIC Educational Resources Information Center

    Paulson, James A.

    This paper reports on a project which has developed the general latent class model as a framework for representation of item responses. This framework can be used to represent data in applications such as mastery tests and other kinds of achievement tests, where there is reason to believe that current foundations are deficient. Methods of…

  2. Datacomputer and SIP Operations

    DTIC Science & Technology

    1979-03-30

    developed in 1977 under ARPA Contract No. N0001 i4-76-C-0991 , as an application package which would utilize the Datacomputer [ Dorin & Sattley] for...Datacomputer Cambridge, Massachusetts, [ DORIN & EASTLAKE] R. H. Darin and Donald E. Eastlake, III; "Use of the Datacomputer in the Vela Seismological... DORIN & SATTLEY] Dorin , R.H. and Sattl^y, J.Z. Databases: Final Technical Report, Report No. CCAr.77-10, Computer America, 575

  3. Tocotrienols and Prostate Cancer

    DTIC Science & Technology

    2005-09-01

    W81XWH-04-1-0035 TITLE: Tocotrienols and Prostate Cancer PRINCIPAL INVESTIGATOR: William L. Stone, Ph.D...REPORT DATE (DD-MM-YYYY) September 2005 2. REPORT TYPE Final 3. DATES COVERED (From - To) 1 Mar 04 – 31 AUG 05 5a. CONTRACT NUMBER Tocotrienols ...tocopherols and tocotrienols , have variable growth inhibitory effects on both types of prostate cancer cell line models. The gamma isoforms are more

  4. Adaptive Interfaces

    DTIC Science & Technology

    1991-03-01

    Project Engineer: Sharon M. Walter/COES/(315) 330-7650 Prime Contractor: lIT Research Institute (IITRI) 12a. DISTRIBUTION/AVAILABIUTY STATEMENT 12b...F30602- 87-D-0094. This contract is with IIT Research Institute (IITRI) and is sponsored by the Rome Air Development Center. The work was performed by... Research Institute (IITRI) and Rome Air Development Center (RADC) this Final Report for Project 7288, Adaptive Interfaces, Task A. This report is

  5. Influence of Time Management Concepts on the Productivity of Vocational Teachers. Final Report. Time Management Concept Project. Department Report No. 57.

    ERIC Educational Resources Information Center

    Nebraska Univ., Lincoln. Dept. of Agricultural Education.

    A study was conducted to determine how vocational teachers used their time, whether teachers in different vocational areas used their time differently, whether a workshop on time management would improve their use of time, and if such factors as marital status, sex, and extended contracts influenced how vocational teachers used their time. Random…

  6. Final Report of Technical Assistance Provided to Guarantee Agencies with Recommendations for Further Improving Program Performance.

    ERIC Educational Resources Information Center

    Touche Ross and Co., Washington, DC.

    Technical assistance provided to loan guarantee agencies by Touche Ross and Co. under contract to the U.S. Office of Education (OE) is described. Objectives of the report are: to summarize the work performed and the results of each of the projects that were conducted; to describe certain prototype systems that were developed for the guarantee…

  7. 48 CFR 49.112-2 - Final payment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final payment. 49.112-2 Section 49.112-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.112-2 Final payment. (a) Negotiated settlement. After execution...

  8. 48 CFR 942.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Final indirect cost rates. 942.705 Section 942.705 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 942.705 Final indirect cost rates. ...

  9. 48 CFR 3442.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Final indirect cost rates. 3442.705 Section 3442.705 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 3442.705 Final indirect cost rates...

  10. Yucca Mountain Project Integrated Data System (IDS); Final report, October 1, 1989--December 31, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1991-05-23

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last versionmore » supplied (July 27, 1990) is included in this document.« less

  11. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  12. The Industrial Base and National Security: A New Strategy

    DTIC Science & Technology

    1993-04-01

    addresses this issue in her article entitled, " Managing Innovation on the Factory Floor": Manufacturing managers often buy the most advanced...Incentives Program." Government Contract Number MDA903-85-C-0139 Final Report, 1986. 31 11. Tyre, Marcie J. " Managing Innovation On The Factory Floor

  13. Listening to the River: Final Evaluation Report

    ERIC Educational Resources Information Center

    Robles, Dawn; Mitchell, Heather; Horsch, Elizabeth; St. John, Mark

    2010-01-01

    "Listening to the River" (LTTR) is a watershed science education project funded by the National Science Foundation. The project aims to deliver watershed education experiences in and around Traverse City, Michigan, and also to develop a model that can be replicated in other locations. Inverness Research was contracted by the…

  14. Final Report on Contract N00014-92-C-0173 (Office of Naval Research)

    DTIC Science & Technology

    2001-01-10

    PHILPOTTI* t Lawrence Livermore National Laboratory, University of California, Livermore, CA 94550, USA SIBM Research Division, Almaden Research Center...defines the ITP on one electrode and adsorbed hydrated lithium ion defines the OlIP on the second electrode. Ions have been classified according to

  15. Final Forensic Audit Report of Iraq Reconstruction Funds

    DTIC Science & Technology

    2012-07-13

    and a fine of $15,000. Retired Navy Lieutenant Commander Frankie Hand, and co-defendant Michelle Adams, a U.S. contractor, met in May 2007 at Camp... Blackwater Contract and Task Orders for Worldwide Personal Protective Services in Iraq, AUD/IQO-09-16 and SIGIR 09-021, June 2009. Security Forces

  16. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  17. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  18. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  19. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  20. [Patient safety in management contracts].

    PubMed

    Campillo-Artero, C

    2012-01-01

    Patient safety is becoming commonplace in management contracts. Since our experience in patient safety still falls short of other clinical areas, it is advisable to review some of its characteristics in order to improve its inclusion in these contracts. In this paper opinions and recommendations concerning the design and review of contractual clauses on safety are given, as well as reflections drawn from methodological papers and informal opinions of clinicians, who are most familiar with the nuances of safe and unsafe practices. After reviewing some features of these contracts, criteria for prioritizing and including safety objectives and activities in them, and key points for their evaluation are described. The need to replace isolated activities by systemic and multifaceted ones is emphasized. Errors, limitations and improvement opportunities observed when contracts are linked to indicators, information and adverse event reporting systems are analysed. Finally, the influence of the rules of the game, and clinicians behaviour are emphasised. Copyright © 2011 SECA. Published by Elsevier Espana. All rights reserved.

  1. 48 CFR 842.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Final indirect cost rates. 842.705 Section 842.705 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 842.705 Final indirect cost rates...

  2. Final Product Strategies in Purchasing and Their Impact on the Information Needs of the Organisation.

    ERIC Educational Resources Information Center

    Inbar, David

    Purchasing contributes significantly to an organization and to its business strategy only if its activities and contracts with suppliers are guided by support criteria for the final products that the organization sells. Outlined in this paper are four innovative purchasing strategies: capitation contracts; product life cycle cost contracts;…

  3. Multi-scale Modeling, Design Strategies and Physical Properties of 2D Composite Sheets

    DTIC Science & Technology

    2014-09-22

    talks and training of two postdoctoral candidates, one graduate student The theoretical work on thennal, elecu·onic and optical prope1iies of 2D ...materials led to several new experimentalists to validate our predictions. 1S. SUBJECT TERMS 2D materials, multi scale modeling 16. SECURITY...strategies and physical properties of 2D composite sheets: Final Report Report Title This report describes the progress made as part of the subject contract

  4. Programmable Logic Controllers for Research on the Cyber Security of Industrial Power Plants

    DTIC Science & Technology

    2017-02-12

    group . 15. SUBJECT TERMS Industrial control systems, cyber security 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF a. REPORT b. ABSTRACT c. THIS...currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (00-MM-YYYY) ,2. REPORT TYPE 3. DATES COVERED...From- To) 12/02/2017 Final 15 August 2015 - 12 February 2017 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Programmable Logic Controllers for Research

  5. On-Line Planning and Mapping for Chemical Plume Tracing

    DTIC Science & Technology

    2004-06-01

    09 - 2005 Final Report 01/04/2001 - 31/10/2004 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER On-line Planning and Mapping for Chemical Plume Tracing 5b...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Department of Electrical Engineering University of California...develop, and implement on-vehicle planning and mapping theory and software to find, trace, and map chemical plumes. This objective included accurate

  6. Limited energy studies, Holston Army Ammunition Plant, Kingport, Tennessee. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-08-01

    This study was conducted and this report prepared under Contract No. DACA 01-91-D-0032, Delivery Orders 2 and 3, issued by the U.S. Army Engineer District, Mobile on 9 September 1991. The purpose of this study was to determine the economic feasibility of the following specific energy conservation opportunities (ECOs) associated with the central heating plants at the Holston Army Ammunition Plant (HAAP).

  7. A Theoretical Framework for Examining Geographical Variability in the Microphysical Mechanisms of Precipitation Development.

    DTIC Science & Technology

    1986-06-01

    Energy and Natural Resources SWS Contract Report 391 FINAL REPORT A THEORETICAL FRAMEWORK FOR EXAMINING GEOGRAPHICAL VARIABILITY IN THE MICROPHYSICAL...U) A Theoretical Framework for Examining Geographical Variability in the Microphysical Mechanisms of Precipitation Development 12. PERSONAL AUTHOR(S...concentration. Oter key parameters include the degree of entrainment and stability of the environment. I 5 - T17 Unclassified ,.-. . A THEORETICAL FRAMEWORK FOR

  8. Oncogenic LINE 1 Retroelements Sustain Prostate Tumor Cells and Promote Metastatic Progression

    DTIC Science & Technology

    2016-12-01

    Tillotson University in Austin , Texas and provides a summer research experience for them where they learn about prostate cancer research , as well as...PRINCIPAL INVESTIGATOR: Denise S. O’Keefe, Ph.D. CONTRACTING ORGANIZATION: UNIVERSITY OF TEXAS , San Antonio SAN ANTONIO TX 78229-3901 REPORT DATE...December 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012

  9. Integrating Traumatic Brain Injury Model Systems Data into the Federal InteragencyTraumatic Brain Injury Research Informatics Systems

    DTIC Science & Technology

    2017-12-01

    methodologies , and associated tools, rather than summaries or interpretations of this information, can accelerate research progress by allowing re-analysis of... Research Informatics Systems PRINCIPAL INVESTIGATOR: Cynthia Harrison-Felix, PhD CONTRACTING ORGANIZATION: Craig Hospital Englewood, CO 80113...REPORT DATE: December 2017 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702

  10. Synthesis of New Organic Semiconducting Polymer Materials Having High Radiowave Absorption Rate

    DTIC Science & Technology

    2008-11-01

    ISTC Project No. #1571P Synthesis of New Organic Semiconducting Polymer Materials Having High Radiowave Absorption Rate Final Project Technical...Technology Center ( ISTC ), Moscow. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information...polymer materials having high radiowave absorption rate 5a. CONTRACT NUMBER ISTC Registration No: A-1571p 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  11. Command and Control in Littoral Operations

    DTIC Science & Technology

    2016-05-13

    mobility. Facing the broad spectrum of threats from mines, patrol boats, submarines and coastal defense cruise missiles, the ATF’s sea control was only...currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 13-05-2016 2. REPORT TYPE...FINAL 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Command and Control in Littoral Operations 5a. CONTRACT

  12. Final Report for Contract N00014-91-J-1815 (University of California, Santa Cruz)

    DTIC Science & Technology

    1993-03-10

    p-(sulfooxy) cinnamic acid , sulfate esters, phenolic acids . Running Title -- Antifouling Activity of Phenolic Acid Sulfates Revision submitted to...Phytochemistrv: 12 January 1993 1 Abstract -- R-(Sulfooxy) cinnamic acid was isolated as a natural product for the first time from the seagrass Zostera...Here we report the first isolation of naturally occurring p- (sulfooxy) cinnamic acid (p-coumaric acid sulfate, 1), and compare its antifouling

  13. Activity Recognition in Social Media

    DTIC Science & Technology

    2015-12-29

    AFRL-AFOSR-JP-TR-2016-0044 Activity Recognition in Social Media Subhasis Chaudhuri INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Final Report 05/09/2016...DATES COVERED (From - To) 12 Aug 2013 to 30 Sep 2015 4. TITLE AND SUBTITLE Activity Recognition in Social Media 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) INDIAN INSTITUTE OF TECHNOLOGY BOMBAY POWAI MUMBAI, 400076 IN 8. PERFORMING ORGANIZATION REPORT NUMBER

  14. Renal vascular responses to static handgrip: role of muscle mechanoreflex

    NASA Technical Reports Server (NTRS)

    Momen, Afsana; Leuenberger, Urs A.; Ray, Chester A.; Cha, Susan; Handly, Brian; Sinoway, Lawrence I.

    2003-01-01

    During exercise, the sympathetic nervous system is activated, which causes vasoconstriction. The autonomic mechanisms responsible for this vasoconstriction vary based on the particular tissue being studied. Attempts to examine reflex control of the human renal circulation have been difficult because of technical limitations. In this report, the Doppler technique was used to examine renal flow velocity during four muscle contraction paradigms in conscious humans. Flow velocity was divided by mean arterial blood pressure to yield an index of renal vascular resistance (RVR). Fatiguing static handgrip (40% of maximal voluntary contraction) increased RVR by 76%. During posthandgrip circulatory arrest, RVR remained above baseline (2.1 +/- 0.2 vs. 2.8 +/- 0.2 arbitrary units; P < 0.017) but was only 40% of the end-grip RVR value. Voluntary biceps contraction increased RVR within 10 s of initiation of contraction. This effect was not associated with an increase in blood pressure. Finally, involuntary biceps contraction also raised RVR. We conclude that muscle contraction evokes renal vasoconstriction in conscious humans. The characteristic of this response is consistent with a primary role for mechanically sensitive afferents. This statement is based on the small posthandgrip circulatory arrest response and the vasoconstriction that was observed with involuntary biceps contraction.

  15. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  16. Final Report for Contract N00014-89-J-1967 for the Time Period from 1 May 1989 to 31 December 1990 (Texas Univ. at Austin. Applied Research Labs.)

    DTIC Science & Technology

    1991-04-23

    in this section. In our investigation of higher order processing methods for remote acoustic sensing we sought to understand the principles of laser...magnitude less than those presently detected in laboratory measurements. An initial study of several potential higher order processing techniques was...incoherent. The use of higher order processing methods to provide some level of discrimination against noise thus appears tractable. Finally, the effects

  17. Federal employees health benefits program; revision of contract cost principles and procedures, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation amending the Federal Employees Health Benefits (FEHB) Acquisition Regulation (FEHBAR). This regulation provides additional contract cost principles and procedures for FEHB Program experience-rated contracts and is intended to clarify our requirements and enhance our oversight of FEHB carriers.

  18. The Science of and Advanced Technology for Cost-Effective Manufacture of High Precision Engineering Products. Volume 5. Automatic Generation of Process Outlines of Forming and Machining Processes.

    DTIC Science & Technology

    1986-08-01

    THE SCIENCE OF AND ADVANCED TECHNOLOGY FOR COST-EFFECTIVE MANUFACTURE Lfl OF HIGH PRECISION ENGINEERING PRODUCTS N iA6/*N ONR Contract No. 83K0385...ADVANCED TECHNOLOGY FOR1 COST-EFFECTIVE MANUFACTURE OF1’ HIGH PRECISION ENGINEERING PRODUCTS ONR Contract No. 83K0385 Final Report Vol. 5 AUTOMATIC...Ck 53N Drawing #: 03116-6233 Raw Material: Iiz’ 500mm diameter and 3000mm length Ma, rial Alloy steel. high carbon content, quenched to Min 45Rc

  19. Skills Conversion Project: Chapter 3, Food Products and Food Services Industry. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The National Society of Professional Engineers, under contract to the Department of Labor, conducted a study to investigate the conversion of technical skills of displaced aerospace and defense professionals to other industries. The Seattle and Wichita study teams, focusing on the food industry, projected that about 200 employment opportunities…

  20. Interface definition for the Far Ultraviolet Spectrometer Experiment S169

    NASA Technical Reports Server (NTRS)

    Fastie, W. G.

    1971-01-01

    A final contract for development, fabrication, test and flight of the ultraviolet spectrometer experiment on an Apollo space mission is reported. Two interface control documents were completed and signed off and three more were essentially completed. Supporting preliminary concepts formulation, design study and component investigation, specification and subcontract negotiation were accomplished.

  1. Manufacture of Optacons for a Field Trial Within Elementary and Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Brugler, J. Stephen; Bliss, James C.

    Telesensory Systems, Inc. (TSI) was awarded a contract to design, develop, and test Optacons (Optical-to-Tactile Converter) and perepheral equipment. Optacons are direct-translation reading aids for the blind. The text summarizes the engineering design, manufacturing activities, field test procedure and results, and it provides recommendations for…

  2. National Center for Education Statistics "Product Planning and Development." Final Report.

    ERIC Educational Resources Information Center

    User Technology Associates, Inc.

    To assist in its mission of providing information in the most timely manner, the National Center for Education Statistics (NCES) contracted for a study of current modes of information dissemination to its user population that would also identify new and emerging technologies for information dissemination. The project is divided into three phases…

  3. A Systems Analysis of the MDTA Institutional Training Program. Final Report.

    ERIC Educational Resources Information Center

    North American Rockwell Information Systems Co., Anaheim, CA.

    An industrial study group was contracted to perform a systems analysis of institutional training conducted under the Manpower Development and Training Act (MDTA) of 1962, as amended, in order to: (1) illuminate management decisions in the areas of program priorities, alternative methods of administration, and allocation of resources, and (2)…

  4. Competency-Based Preservice Construction Trades Curriculum, Phase II. Final Report.

    ERIC Educational Resources Information Center

    Nelms, Howard F.

    A two-phase curriculum project was undertaken in Illinois to develop, test, and implement a two-year competency-based model for the education of secondary school building construction teachers in the area of residential structures. During the first contract period, skill and knowledge competencies were identified and validated for thirteen units…

  5. A cellular automata approach to estimate incident-related travel time on Interstate 66 in near real time : final contract report.

    DOT National Transportation Integrated Search

    2010-03-01

    Incidents account for a large portion of all congestion and a need clearly exists for tools to predict and estimate incident effects. This study examined (1) congestion back propagation to estimate the length of the queue and travel time from upstrea...

  6. The Impact of Legal and Administrative Remedies to Overcome Discrimination in Employment. Final Report.

    ERIC Educational Resources Information Center

    Marshall, Ray; and Others

    This study examines the effectiveness of specific attempts to remedy employment discrimination against minorities through litagation and contract compliance efforts. Further, its objective is to identify factors underlying the effectiveness or lack of effectiveness of court decisions and out-of-court settlements in producing changes in minority…

  7. Skills Conversion Project: Chapter 11, Banking, Finance and Insurance. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The National Society of Professional Engineers, under contract to the U.S. Department of Labor, conducted a study to investigate the conversion of skills of displaced aerospace defense technical professional to other industries. The Long Island team of the study project investigated the banking, finance, and insurance industries. Approximately 250…

  8. Striving for Excellence. Final Report to SPD1 Motorola.

    ERIC Educational Resources Information Center

    Merex Corp., Tempe, AZ.

    In 1988 SPD1, a division of Motorola, began an extensive 4-year endeavor to transform itself into an organization built on excellence and customer satisfaction. SPD1 contracted with Merex Corporation to provide three services that would enable employees to take on their new responsibilities more effectively. Merex conducted Skills Enhancement…

  9. Human Rehabilitation Techniques. Contract Papers. Volume III, Part B.

    ERIC Educational Resources Information Center

    Ross, E. C.; And Others

    Volume III, Section B of a six-volume final report (which covers the findings of a research project on policy and technology related to rehabilitation of disabled individuals) presents four papers which examine important rehabilitation-oriented issues. In the first paper, "Transportation Problems of Persons with Disabilities--The Federal Response"…

  10. Time rate of local scour at complex bridge piers field and laboratory analyses : final report, April 2009.

    DOT National Transportation Integrated Search

    2009-04-01

    A local scour evolution field study was conducted under this contract. One of the piers on the A1A Bridge over the Intracoastal Waterway (ICCW) in Fort Pierce, Florida was selected for the test site. The existing local scour hole was filled with sand...

  11. Development of scan analysis techniques employing a small computer. Final report, February 1, 1963--July 31, 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhl, D.E.

    1976-08-05

    During the thirteen year duration of this contract the goal has been to develop and apply computer based analysis of radionuclide scan data so as to make available improved diagnostic information based on a knowledge of localized quantitative estimates of radionuclide concentration. Results are summarized. (CH)

  12. Third Expert Consultation on RAMP (RAMP III) (Helsinki, Finland, September 13, 15 and 20, 1986). Final Report.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific and Cultural Organization, Paris (France). General Information Programme.

    Organized for the United Nations Educational, Scientific, and Cultural Organization (Unesco) by contract with the International Council on Archives (ICA), this meeting concerning the Records and Archives Management Programme (RAMP) was attended by 14 experts invited from Unesco member countries. Following a brief introduction, summaries are…

  13. Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1

    DTIC Science & Technology

    1991-09-01

    91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH

  14. Fatigue Damage-Strength Relationships in Composite Laminates. Volume 1

    DTIC Science & Technology

    1983-09-01

    NUMBER 2. A ES ION N • /NT’S CATALOG NUMBER AFWAL-TR-83-3084, Vol I .A_"_.._ 4. TITLE (ad Subtitle) S. TYPE OF REPORT & PERIOD COVERED 1 June 1981...Fatigue Damage-Strength Relationships in Final: 31 May 1983 Composite Laminates 6. PERFORMING OAG. REPORT NUMBER 7. AUTHOR(e) 6. CONTRACT OR GRANT...I1. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE September 1983 AFWAL/FIBEC 13. NUMBER OF PAGES Wright Patterson AFB, OH 45433 55 14. MONITORING

  15. DARPA Advanced High Current Density Cathodes for Defense Applications: Development Phase

    DTIC Science & Technology

    1993-03-01

    Project Number 01-0624-07-0857 Report Number SAIC-93/1018 March 1, 1993 Science Apphcations Internatia Corporation An Employee-Owned Company OTIC a...Density Cathodes for Defense Applications: Development Phase FINAL REPORT Contract Number N00014-90-C-2118 Project Number 01-0624-07-0857 Report...of a typical Si-TaSi2 boule used for the eutectic advanced cathode materials in this project . The seed for the boule is at right in the photograph. v

  16. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  17. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  18. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  19. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  20. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  1. Biochemical Markers of Brain Injury: An Integrated Proteomics-Based Approach

    DTIC Science & Technology

    2007-02-01

    1. REPORT DATE 01-02-2007 2. REPORT TYPE Final 3. DATES COVERED 1 Feb 2003 – 31 Jan 2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER...Pineda, et al, in press). The second review (Denslow, et al, J Neurotrauma, 2003 ) provides an important resource for application of proteomics...Aebersold and Watts, 2002; Grant & Blackstock, 2001; Grant & Husi, 2001; Hanash, 2003 ; Hochstrasser et al., 2002; Service, 2001; Smith, 2000). Yet, the

  2. Test and Evaluation Enhancements for Cognitive Radio Technologies

    DTIC Science & Technology

    2015-05-13

    SECURITY CLASSIFICATION OF: This document serves as the final report for the Department of Defense (DoD) Research and Education Program for...report will described the instrumentation and the integration into the academic and research programs . All instrumentation has been procured, delivered...UNIT NUMBER 5c. PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO. 0704-0188 3. DATES COVERED (From - To) - UU UU UU UU

  3. High Temperature Superconducting State in Metallic Nanoclusters and Nano-Based Systems

    DTIC Science & Technology

    2013-12-01

    pr.ac Semenova 1a Russia EOARD ISTC 09-7006/P-4084p Report Date: December 2013 Final Report from 01 October 2010 to 30 September 2013...CONTRACT NUMBER ISTC PPA 4084p 5b. GRANT NUMBER ISTC 09-7006 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S...discussed in the conventional theory. High Temperature Superconducting State in Metallic Nanoclusters and Nano-Based Systems ISTC Project No. 4084p

  4. Advanced Computer Typography.

    DTIC Science & Technology

    1981-12-01

    ADVANCED COMPUTER TYPOGRAPHY .(U) DEC 81 A V HERSHEY UNCLASSIFIED NPS012-81-005 M MEEEIEEEII IIUJIL15I.4 MICROCQP RE SO.JjI ON ft R NPS012-81-005...NAVAL POSTGRADUATE SCHOOL 0Monterey, California DTIC SELECTEWA APR 5 1982 B ADVANCED COMPUTER TYPOGRAPHY by A. V. HERSHEY December 1981 OApproved for...Subtitle) S. TYPE Or REPORT & PERIOD COVERED Final ADVANCED COMPUTER TYPOGRAPHY Dec 1979 - Dec 1981 S. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(s) S CONTRACT

  5. 9433 Design Pointing Anomaly. Volume II. Appendices

    DTIC Science & Technology

    1976-01-30

    CALIFORNIA 90278 This final report was submitted by TRW Defense and Space t) Systems Group, One Space Park, Redondo Beach, CA 90278, under Contract F04701-75...C-0257, with the Space and Missile Systems Organization, Deputy for Space Communications Systems , P.O. Box 92960, Worldway Postal Center, Los Angeles...CA 90009. Captain G. D. Nordley, SAMSO/SKD, was the Projcect Officer for Space Communications Systems . This report has been reviewed by the

  6. HLLV avionics requirements study and electronic filing system database development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This final report provides a summary of achievements and activities performed under Contract NAS8-39215. The contract's objective was to explore a new way of delivering, storing, accessing, and archiving study products and information and to define top level system requirements for Heavy Lift Launch Vehicle (HLLV) avionics that incorporate Vehicle Health Management (VHM). This report includes technical objectives, methods, assumptions, recommendations, sample data, and issues as specified by DPD No. 772, DR-3. The report is organized into two major subsections, one specific to each of the two tasks defined in the Statement of Work: the Index Database Task and the HLLV Avionics Requirements Task. The Index Database Task resulted in the selection and modification of a commercial database software tool to contain the data developed during the HLLV Avionics Requirements Task. All summary information is addressed within each task's section.

  7. Airborne/Space-Based Doppler Lidar Wind Sounders Sampling the PBL and Other Regions of Significant Beta and U Inhomogeneities

    NASA Technical Reports Server (NTRS)

    Emmitt, Dave

    1998-01-01

    This final report covers the period from April 1994 through March 1998. The proposed research was organized under four main tasks. Those tasks were: (1) Investigate the vertical and horizontal velocity structures within and adjacent to thin and subvisual cirrus; (2) Investigate the lowest 1 km of the PBL and develop algorithms for processing pulsed Doppler lidar data obtained from single shots into regions of significant inhomogeneities in Beta and U; (3) Participate in OSSEs including those designed to establish shot density requirements for meso-gamma scale phenomena with quasi-persistent locations (e.g., jets, leewaves, tropical storms); and (4) Participate in the planning and execution of an airborne mission to measure winds with a pulsed CO2 Doppler lidar. Over the four year period of this research contract, work on all four tasks has yielded significant results which have led to 38 professional presentations (conferences and publications) and have been folded into the science justification for an approved NASA space mission, SPARCLE (SPAce Readiness Coherent Lidar Experiment), in 2001. Also this research has, through Task 4, led to a funded proposal to work directly on a NASA field campaign, CAMEX III, in which an airborne Doppler wind lidar will be used to investigate the cloud-free circulations near tropical storms. Monthly progress reports required under this contract are on file. This final report will highlight major accomplishments, including some that were not foreseen in the original proposal. The presentation of this final report includes this written document as well as material that is better presented via the internet (web pages). There is heavy reference to appended papers and documents. Thus, the main body of the report will serve to summarize the key efforts and findings.

  8. 78 FR 72572 - Operational Contract Support

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... 0790-AI48 Operational Contract Support AGENCY: Department of Defense (DoD). ACTION: Final rule. SUMMARY: This rule establishes policy, assigns responsibilities, and provides procedures for operational contract support (OCS), including OCS program management, contract support integration, and integration of...

  9. 48 CFR 2027.305-3 - Follow-up by Government.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide the following written determination before final payment and closeout of the contract: (1) No inventions or discoveries were made, (2) No copyrights were secured, produced, or composed, (3) No notices or... any final payment and closing out the contract. ...

  10. A Program of Technical Assistance to Industry in Twenty-Six Mississippi Counties and the Choctaw Indian Reservation. Final Report.

    ERIC Educational Resources Information Center

    Phillips, Jane; Sewell, Charles

    A broad technical assistance program has been established in 25 EDA (Economic Development Administration) contract counties and on the Choctaw Indian Reservation Nashoba County) to stimulate new job opportunities by solving operational problems which limit the expansion and diversification of existing industry; professional services in evaluating…

  11. Regional Comparative Advantage for Woody Biofuels Production

    Treesearch

    Timothy M. Young; Donald G. Hodges; Robert C. Abt; Andy J. Hartsell; James H. Perdue

    2009-01-01

    The economic availability of woody biomass for the southeastern United States is summarized in this final report for the U.S. Department of Transportation, Southeastern Sun Grant Center research contract R11-0515-016 as administered by the University of Tennessee. Georeferenced economic supply curves (marginal cost curves) for woody biomass producers’ for the 13...

  12. Non-Invasive Pneumothorax Detector

    DTIC Science & Technology

    2012-04-01

    AD_________________ Award Number: W81XWH-09-2-0092 TITLE: Non-Invasive Pneumothorax Detector...REPORT TYPE Final 3. DATES COVERED 27 July 2009 – 31 August 2011 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Non-Invasive Pneumothorax ...that form the scope of work support the development and clinical testing of a non-invasive pneumothorax detector. Goal and objectives are reflected in

  13. The Center for In-Service Education. Final Evaluation Report. Volume II. Part 1.

    ERIC Educational Resources Information Center

    Tennessee State Dept. of Education, Nashville.

    This is an overview of the extensive in-service education inventory conducted as an integral portion of the planning contract for Models for In-Service Education supported by the Tennessee State Department of Education under Title III, Elementary and Secondary Education Act. The narrative descriptions are free of extensive statistical references…

  14. Functional Assessment of the Role of BORIS in Ovarian Cancer Using a Novel in Vivo Model System

    DTIC Science & Technology

    2014-10-01

    2. REPORT TYPE Annual 3. DATES COVERED 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Functional Assessment of the Role of BORIS in Ovarian Cancer...Finally, the Institutional Biosafety Protocol for the use of adenoviruses was also resubmitted and approved by Roswell Park Cancer Institute. 1b

  15. Collegiate Cyber Defense Competition Effort

    DTIC Science & Technology

    2018-03-01

    Energy – an electrical utility company. • 2016 : ODIN Security – a small aerospace and defense contracting firm Approved for Public Release...to secure supervisory control and data acquisition (SCADA) networks. Approved for Public Release; Distribution Unlimited 7 During the 2016 NCCDC...COLLEGIATE CYBER DEFENSE COMPETITION EFFORT UNIVERSITY OF TEXAS AT SAN ANTONIO MARCH 2018 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE

  16. National Remodelling Team: Evaluation and Impact Study (Year 1) Final Report

    ERIC Educational Resources Information Center

    Wilson, Rebekah; Easton, Claire; Smith, Paula; Sharp, Caroline

    2005-01-01

    The National Remodelling Team (NRT) was established in April 2003 by the Department for Education and Skills (DfES) and hosted within the National College for School Leadership (NCSL). The role of the NRT was to work with local education authorities (LEAs) to support schools in the implementation of the changes to teachers' contracts introduced by…

  17. Evaluation of the National Science Foundation's Partnerships for International Research and Education (PIRE) Program, Volume 2: Supplementary Materials. Final Report

    ERIC Educational Resources Information Center

    Martinez, Alina; Epstein, Carter; Parsad, Amanda

    2015-01-01

    The National Science Foundation contracted with Abt Associates to conduct an evaluation of its Partnerships for International Research and Education (PIRE) program, which supports intellectually substantive collaborations between U.S. and foreign researchers in which the international partnership is essential to the research effort. The evaluation…

  18. Evaluation of the National Science Foundation's Partnerships for International Research and Education (PIRE) Program, Volume 1: Final Report

    ERIC Educational Resources Information Center

    Martinez, Alina; Epstein, Carter; Parsad, Amanda

    2015-01-01

    The National Science Foundation contracted with Abt Associates to conduct an evaluation of its Partnerships for International Research and Education (PIRE) program, which supports intellectually substantive collaborations between U.S. and foreign researchers in which the international partnership is essential to the research effort. The evaluation…

  19. Biologically-Inspired Anisotropic Flexible Wing for Optimal Flapping Flight

    DTIC Science & Technology

    2013-07-01

    AFRL-OSR-VA-TR-2013-0400 Biologically-Inspired, Anisotropic Flexible Wing for Optimal Flapping Flight Luis Bernal, Wei Shyy...Final Report Contract Number: FA9550-07-1-0547 Biologically-Inspired, Anisotropic Flexible Wing for Optimal Flapping Flight University of...minimize power consumption; 2. The interactions of unsteady aerodynamic loading with flexible structures; 3. Flexible , light-weight, multifunctional

  20. Law and Agriculture in Washington State. A Curriculum Guide. Final Report.

    ERIC Educational Resources Information Center

    Parkert, Gary M.; Cvancara, Joseph G., Ed.

    This curriculum guide consists of materials for high school vocational agriculture instructors to use in teaching a course in the law and agriculture. Addressed in the individual units of the guide are the following topics: the purpose of the law in our society, the judicial system, contract law, torts, ownership of land, and water rights. Each…

  1. 78 FR 37667 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ...-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013-008 Davis. to... Contracting Integrity, an internal DoD panel, consists of senior-level DoD officials from across DoD working... contractor performance. This final rule is not required to be published for public comment because it only...

  2. Development of Precoat Filtration Technology for Reverse Osmosis Units

    DTIC Science & Technology

    1981-11-20

    CONTRACT DAAK 70-79-C-0046 0 FINAL REPORT 0 DEVELOPMENT OF PRECOAT FILTRATION TECHNOLOGY FOR REVERSE OSMOSIS UNITS Submitted by: ,i JOHNS - MANVILLE SALES...NTU (Hach). The one square foot vertical leaf filter was set up at the Johns - Manville R&D Center as shown in Figure 1. A 300 gallon feed tank was

  3. DOCUMENTATION FOR THE GRIDDED HOURLY ATRAZINE EMISSIONS DATA SET FOR THE LAKE MICHIGAN MASS BALANCE STUDY: A FINAL CONTRACT REPORT

    EPA Science Inventory

    In order to develop effective strategies for toxics management, the Great Lakes National Program Office (GLNPO) of the United States Environmental Protection Agency (U.S. EPA), in 1994, launched an ambitious five year program to conduct a mass balance study of selected toxics p...

  4. Development and Evaluation of Video Systems for Performance Testing and Student Monitoring. Final Report.

    ERIC Educational Resources Information Center

    Hayes, John; Pulliam, Robert

    A video performance monitoring system was developed by the URS/Matrix Company, under contract to the USAF Human Resources Laboratory and was evaluated experimentally in three technical training settings. Using input from 1 to 8 video cameras, the system provided a flexible combination of signal processing, direct monitor, recording and replay…

  5. 48 CFR 42.702 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... estimated rates subject to adjustment during contract performance and at the time the final indirect cost....702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT... under this subpart provides— (1) Uniformity of approach with a contractor when more than one contract or...

  6. 48 CFR 42.702 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... estimated rates subject to adjustment during contract performance and at the time the final indirect cost....702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT... under this subpart provides— (1) Uniformity of approach with a contractor when more than one contract or...

  7. Analysis and control of the METC fluid bed gasifier. Final report (includes technical progress report for October 1994--January 1995), September 1994--September 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-09-01

    This document presents a modeling and control study of the Fluid Bed Gasification (FBG) unit at the Morgantown Energy Technology Center (METC). The work is performed under contract no. DE-FG21-94MC31384. The purpose of this study is to generate a simple FBG model from process data, and then use the model to suggest an improved control scheme which will improve operation of the gasifier. The work first developes a simple linear model of the gasifier, then suggests an improved gasifier pressure and MGCR control configuration, and finally suggests the use of a multivariable control strategy for the gasifier.

  8. Final Report. LAW Glass Formulation to Support AP-101 Actual Waste Testing, VSL-03R3470-2, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muller, I. S.; Pegg, I. L.; Rielley, Elizabeth

    2015-06-22

    The main objective of the work was to develop and select a glass formulation for vitrification testing of the actual waste sample of LAW AP-101 at Battelle - Pacific Northwest Division (PNWD). Other objectives of the work included preparation and characterization of glasses to demonstrate compliance with contract and processing requirements, evaluation of the ability to achieve waste loading requirements, testing to demonstrate compatibility of the glass melts with melter materials of construction, comparison of the properties of simulant and actual waste glasses, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  9. White-Light Optical Information Processing and Holography.

    DTIC Science & Technology

    1987-01-23

    is now with Martin Marietta Laboratories, 1450 S. Rolling Rd., Baltimore, Maryland 21227. Abstract Computer simulation and experimental results lof c...Final Report on Contracts AFOSR-81-0148 and AFOSR-83-01 .40 Period Covered (February 15, 1981 - May 14, 1986) Date: December 16, 1986 E T [C E LECTE 87...4Unclassified SEPC-U41Ty CLASSIFICATION 0; TH!S~ PAGE REPORT DOCUMENTATION PAGE IREPORT SECURITY C1ASSIFICATION Io. RESTRICTIVEq* Unclassified R 1 J 1

  10. Coexpression of the Follicle Stimulating Hormone Receptor and Stem Cell Markers: A Novel Approach to Target Ovarian Cancer Stem Cells

    DTIC Science & Technology

    2016-03-01

    1 AD_____________ Award Number: W81XWH-11-1-0623 TITLE: Coexpression of the Follicle Stimulating Hormone Receptor and Stem Cell Markers: A...Novel Approach to Target Ovarian Cancer Stem Cells PRINCIPAL INVESTIGATOR: David W. Schomberg, PhD CONTRACTING ORGANIZATION: Duke University...Durham, NC 27705 REPORT DATE: March 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick

  11. APPS-IV Civil Works Data Extraction/Data Base Application Study

    DTIC Science & Technology

    1982-09-01

    QA 1 2 3 889 ETL-031 0 APPS-IV civil works data extraction/data base application study (phase 1) Jonathan C. Howland Autometric, Incorporated 5205... STUDY FINAL REPORT (PHASE I) 6. PERFORMING ORG. REPORT NUMBER 900-0081 7. AUTHOR(@) S. CONTRACT ON GRANT NUMBER(B) DAAK70-8 I -C-026 1 Jonathan C...CAPIR system was applied to a flood damage potential study . The particular applications were structure mapping and land use interpretation. A Civil

  12. Diatom-Based Material Production Demonstration

    DTIC Science & Technology

    2016-03-14

    Standard Form 298 (Rev 8/98) Prescribed by ANSI Std. Z39.18 Final Report W911NF-15-2-0012 66671-CH-DRP.5 808-212-4509 a. REPORT 14. ABSTRACT 16...diatomaceous earth. Diatomaceous earth consists of fossilized diatom cell walls, which have non uniform size with a lot of debris and a large...PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO. 0704-0188 3. DATES COVERED (From - To) - Approved for Public Release

  13. Adaptive Problem Solving

    DTIC Science & Technology

    2017-03-01

    AFRL-AFOSR-JP-TR-2017-0026 Adaptive Problem Solving Michael Barley THE UNIVERSITY OF AUCKLAND Final Report 03/01/2017 DISTRIBUTION A: Distribution...May 2015 to 26 Nov 2016 4. TITLE AND SUBTITLE Adaptive Problem Solving 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-15-1-4069 5c.  PROGRAM ELEMENT...Report for AOARD Grant FA2386-15-1-4069 “ Adaptive Problem Solving” 25 February 2017 Name of Principal Investigators (PI): Michael W. Barley - e

  14. Flood Control, Mississippi River, La Crosse, Wisconsin.

    DTIC Science & Technology

    1975-10-01

    end SuP.,tifle) S TYPE OF REPORT & PERIOD COVEkr FINAL ENVIRONMENTAL IMPACT STATEMENT FLOOD CONTROL MISSISSIPPI RIVER LA CROSSE, WISCONSIN Pinal FIq 6...PERFORMING ORG. REPORT NUMBER 7. AUTHOR(e) 0 CONTRACT OR GRANT NUMBER( s ) 9 PERFORMING ORGANIZATION NAME AND ADrRESS 10. PROGRAM ELEMENT. PROJECT, T...rev s eflA ff r,,.e.. ind IdeInify by block rnmber) "-The proposed action is a flood control project consisting of levees, road raises, flood wall

  15. Seabasing Innovation Cell Transfer of Goods at Sea’

    DTIC Science & Technology

    2004-03-01

    estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining...does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1 . REPORT DATE (DD-MM-YYYY) 1 -Mar...2004 2. REPORT TYPE Final 3. DATES COVERED (From - To) 1 -Apr-2003 – 1 -Jul-2003 5a. CONTRACT NUMBER N0002401 WX 20594 5b. GRANT NUMBER 4. TITLE

  16. Methods, Software and Tools for Three Numerical Applications. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. R. Jessup

    2000-03-01

    This is a report of the results of the authors work supported by DOE contract DE-FG03-97ER25325. They proposed to study three numerical problems. They are: (1) the extension of the PMESC parallel programming library; (2) the development of algorithms and software for certain generalized eigenvalue and singular value (SVD) problems, and (3) the application of techniques of linear algebra to an information retrieval technique known as latent semantic indexing (LSI).

  17. Structural Composites With Tuned EM Chirality

    DTIC Science & Technology

    2014-12-23

    photonic   crystals .   Tammuz  Dubnov  (7/14  –  9/14)  –  Laboratory  Assistant  -­‐  assisted in the testing...AFRL-OSR-VA-TR-2015-0018 STRUCTURAL COMPOSITES WITH TUNED EM CHIRALITY Siavouche Nemat Nasser UNIVERSITY OF CALIFORNIA SAN DIEGO Final Report 12/23...REPORT Grant/Contract  Title:        STRUCTURAL  COMPOSITES  WITH  TUNED  EM   CHIRALITY     Grant  No.:

  18. Research in Inorganic Fluorine Chemistry

    DTIC Science & Technology

    1991-05-28

    n >*2F* EL JUL.l 8 1995 i 1 ^0 ^9^> ( 00 coll RESEARCH IN INORGANIC FLUORINE CHEMISTRY FINAL REPORT RI/RD91-165 Period 1 April...1988 - 31 March 1991 Prepared for: U. S. A3MY RESEARCH OFFICE RESEARCH TRIANGLE PARK, NC 27709 A Report on Work Sponsored by the U. S. Army... Research Office, under Contract DAAL03-88-C-0005 Approved for public release; distribution unlimited Reproduction in whole or in pan is permitted for

  19. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume II: Appendices A to E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dev, H.; Enk, J.; Jones, D.

    This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report This document is Volume II, containing appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow wasmore » increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees}to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.« less

  20. Analysis of EDP performance

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The objective of this contract was the investigation of the potential performance gains that would result from an upgrade of the Space Station Freedom (SSF) Data Management System (DMS) Embedded Data Processor (EDP) '386' design with the Intel Pentium (registered trade-mark of Intel Corp.) '586' microprocessor. The Pentium ('586') is the latest member of the industry standard Intel X86 family of CISC (Complex Instruction Set Computer) microprocessors. This contract was scheduled to run in parallel with an internal IBM Federal Systems Company (FSC) Internal Research and Development (IR&D) task that had the goal to generate a baseline flight design for an upgraded EDP using the Pentium. This final report summarizes the activities performed in support of Contract NAS2-13758. Our plan was to baseline performance analyses and measurements on the latest state-of-the-art commercially available Pentium processor, representative of the proposed space station design, and then phase to an IBM capital funded breadboard version of the flight design (if available from IR&D and Space Station work) for additional evaluation of results. Unfortunately, the phase-over to the flight design breadboard did not take place, since the IBM Data Management System (DMS) for the Space Station Freedom was terminated by NASA before the referenced capital funded EDP breadboard could be completed. The baseline performance analyses and measurements, however, were successfully completed, as planned, on the commercial Pentium hardware. The results of those analyses, evaluations, and measurements are presented in this final report.

  1. Computational Methods for Nonlinear Dynamic Problems in Solid and Structural Mechanics: Progress in the Theory and Modeling of Friction and in the Control of Dynamical Systems with Frictional Forces

    DTIC Science & Technology

    1989-03-31

    present several numerical studies designed to reveal the effect that some of the governing parameters have on the behavior of the system and, whenever...Friction and in the Control of Dynamical Systems with Frictional Forces FINAL TECHNICAL REPORT March 31, 1989 _ -- I -.7: .-.- - : AFOSR Contract F49620...SOLID AND STRUCTURAL MECHANICS: Progress in the Theory and Modeling of Friction and in the Control of Dynamical Systems with Frictional Forces I I * FINAL

  2. 48 CFR 242.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Final indirect cost rates. 242.705 Section 242.705 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 242...

  3. Federal employees health benefits acquisition regulation: Board of Contract Appeals. Final rule.

    PubMed

    2008-10-08

    The Office of Personnel Management (OPM) is adopting as final,without change, the proposed rule published April 7, 2008 to remove the designation of the Armed Services Board of Contract Appeals (ASBCA)from the Federal Employees Health Benefits Acquisition Regulation(FEHBAR).

  4. Developing Sensitive and Selective Nanosensors: A Single Molecule - Multiple Excitation Source Approach. Altairnano Lithium Ion Nano-scaled Titanate Oxide Cell and Module Abuse Testing

    DTIC Science & Technology

    2012-03-13

    Source Approach Part II. Altairnano Lithium Ion Nano-scaled Titanate Oxide Cell and Module Abuse Testing 14. ABSTRACT 16. SECURITY CLASSIFICATION OF...Lithium Ion Nano-scaled Titanate Oxide Cell and Module Abuse Testing Report Title ABSTRACT This final report for Contract W911NF-09-C-0135 transmits the...prototype development. The second (Part II.) is "Altairnano Lithium Ion Nano-scaled Titanate Oxide Cell and Module Abuse Test Report". The

  5. Tool development in threat assessment: syntax regularization and correlative analysis. Final report Task I and Task II, November 21, 1977-May 21, 1978. [Linguistic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miron, M.S.; Christopher, C.; Hirshfield, S.

    1978-05-01

    Psycholinguistics provides crisis managers in nuclear threat incidents with a quantitative methodology which can aid in the determination of threat credibility, authorship identification and perpetrator apprehension. The objective of this contract is to improve and enhance present psycholinguistic software systems by means of newly-developed, computer-automated techniques which significantly extend the technology of automated content and stylistic analysis of nuclear threat. In accordance with this overall objective, the first two contract Tasks have been completed and are reported on in this document. The first Task specifies the development of software support for the purpose of syntax regularization of vocabulary to rootmore » form. The second calls for the exploration and development of alternative approaches to correlative analysis of vocabulary usage.« less

  6. Noise Measurements of the VAIIPR Fan

    NASA Technical Reports Server (NTRS)

    Mendoza, Jeff; Weir, Don

    2012-01-01

    This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period September 2004 through November 2005 for the National Aeronautics and Space Administration (NASA) Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3- 01136, Task Order 6, Noise Measurements of the VAIIPR Fan. The NASA Task Manager was Dr. Joe Grady, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. The NASA Contract Officer was Mr. Albert Spence, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. This report focuses on the evaluation of internal fan noise as generated from various inflow disturbances based on measurements made from a circumferential array of sensors located near the fan and sensors upstream of a serpentine inlet.

  7. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  8. 48 CFR 552.219-74 - Section 8(a) Direct Award.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting activity shall give advance notice to SBA before it issues a final notice terminating performance... prior to processing any advance payments or novation agreements. The contracting activity may assign contract administration functions to a contract administration office. (c) The Contractor agrees: (1) To...

  9. Army Manpower Cost System (AMCOS) Economic and Budget Cost Models.

    DTIC Science & Technology

    1985-06-30

    STANDARDS - 963 - A ZRDMServices0opaiy in ( o FINAL REPORT Tm ARMY MANPOWER COST SYSTEM4 (ANCOS) ECONOMIC AND BUDGET I COST MODELS CONTRACT NO. N00014...Organization .. .. . . . . . . . . . 1 2.0 AN APPLICATION OF ANCOS: UNIT-LEVEL MANPOWER COST COMPARISON . . . . o ...13 3.0 MODEL OVERVIEW . . . . o . . . . . . .. . .. . o . . 21 3.1 Cost Definitions ........ ............ 22 3.2 Model Output

  10. Verification Games: Crowd-Sourced Formal Verification

    DTIC Science & Technology

    2016-03-01

    VERIFICATION GAMES : CROWD-SOURCED FORMAL VERIFICATION UNIVERSITY OF WASHINGTON MARCH 2016 FINAL TECHNICAL REPORT...DATES COVERED (From - To) JUN 2012 – SEP 2015 4. TITLE AND SUBTITLE VERIFICATION GAMES : CROWD-SOURCED FORMAL VERIFICATION 5a. CONTRACT NUMBER FA8750...clarification memorandum dated 16 Jan 09. 13. SUPPLEMENTARY NOTES 14. ABSTRACT Over the more than three years of the project Verification Games : Crowd-sourced

  11. Improving New Teacher Supports through District Capacity-Building: Final Evaluation Report for CSTP's New Teacher Alliance

    ERIC Educational Resources Information Center

    Stokes, Laura; Helms, Jenifer

    2009-01-01

    Inverness Research is an independent national educational research group based in California. Its mission is to help projects assess the quality and efficacy of their efforts, and to help funders better understand the design of their initiatives and the value of their investments. Inverness Research has served by contract with CSTP (Center for…

  12. Final Technical Report for Contract Number N00014-81-K-0457.

    DTIC Science & Technology

    1986-01-01

    to noise ratio. 1W 110*Ma a.0 Pleistocene ,. - -Pliocene N - Miocene 40 SEISMIC REFRACTION STATIONS Pq-3 Oligoceno 50--pa- Eocene O! ,k ’ -Palec ene 0...departure from the idea that the av- 50-[ Eocene erage oceanic crust is entirely emplaced at the I -Paleocene mid-ocean ridges. o K2 Late - FRACTURE ZONES

  13. Space Station evolution study

    NASA Technical Reports Server (NTRS)

    Evans, David B.

    1993-01-01

    This is the Space Station Freedom (SSF) Evolution Study 1993 Final Report, performed under NASA Contract NAS8-38783, Task Order 5.1. This task examined: (1) the feasibility of launching current National Space Transportation System (NSTS) compatible logistics elements on expendable launch vehicles (ELV's) and the associated modifications, and (2) new, non-NSTS logistics elements for launch on ELV's to augment current SSF logistics capability.

  14. Is the Job Training Partnership Act Training Displaced Homemakers? A Technical Report on Services to Displaced Homemakers under JTPA.

    ERIC Educational Resources Information Center

    Spero, Abby

    The Displaced Homemakers Network surveyed its 425 programs in the winter of 1985 to determine the extent and nature of services to displaced homemakers under the Job Training Partnership Act (JTPA). Also sought was information about the barriers to JTPA that kept program operators from bidding successfully for contracts. Finally, the survey…

  15. A Contract to Encourage Full Utilization of Educational Talent. Final Report 1968-1969.

    ERIC Educational Resources Information Center

    New Mexico Council for the Development of Educational Talent, Las Vegas.

    Goals of the New Mexico Educational Talent Project--funded under Title III of the Elementary and Secondary Education Act--are (1) to identify qualified secondary school students at the 11th grade or earlier and assist them in completing their high school education, (2) to encourage an increasing number of high school students to select a teaching…

  16. Advanced Soldier Wearable Embedded Training System Final Report

    DTIC Science & Technology

    2004-10-21

    Rechargeable Battery Packs Ø Battery Chemistry: LiIon CONTRACT NO. PART NUMBER REV SHEET N61339-04-C-0051 98-P59921E - 22 Approved For...Electronics Board................................................................................ 24 Figure 12 Sensor Battery Charger...using on the LW-SI program along with the common single battery type being used on the LW-SI program. This also includes the reuse of the actual

  17. Spectroradiometric calibration of the Thematic Mapper and multispectral scanner system

    NASA Technical Reports Server (NTRS)

    Slater, P. N.; Palmer, J. M. (Principal Investigator)

    1985-01-01

    The eleventh quarterly report on Spectroradiometric Calibration of the Thematic Mapper (Contract NAS5-27832) discusses calibrations made at White Sands on 24 May 1985. An attempt is made to standardize test results. Critical values used in the final steps of the data reduction and the comparison of the results of the pre-flight and internal calibration (IC) data are summarized.

  18. INTER LABORATORY COMBAT HELMET BLUNT IMPACT TEST METHOD COMPARISON

    DTIC Science & Technology

    2018-03-26

    HELMET BLUNT IMPACT TEST METHOD COMPARISON by Tony J. Kayhart Charles A. Hewitt and Jonathan Cyganik March 2018 Final...Report March 2016 – August 2017 Approved for public release; distribution is unlimited U.S. Army Natick Soldier Research ...INTER-LABORATORY COMBAT HELMET BLUNT IMPACT TEST METHOD COMPARISON 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR

  19. Synthesis of Core-Shell Nanoparticle Composites

    DTIC Science & Technology

    2010-08-17

    Mawson Institute, University of South Australia 1 Final Report Contract Number FA2386-09-1-4043 Synthesis of Core-Shell Nanoparticle Composites...CI: Peter Majewski, School of Advanced Manufacturing and Mechanical Engineering, Mawson Institute, University of South Australia, peter.majewski...5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) University of South Australia, Mawson Lakes Blvd., Mawson Lakes SA, Australia

  20. Demonstration Training Program for Improving the Capacity of Primary Care Units to Function Within an HMO Setting. Final Report.

    ERIC Educational Resources Information Center

    Detroit Medical Foundation, MI.

    The Demonstration Training Program (DTP) undertaken by the Detroit Medical Foundation (DMF) was designed for Primary Care Unit staffs (PCUs) or Physician Corporations (PCs), area health center providers under contract to the Michigan Health Maintenance Organization Plans, Inc. (MHMOP). The major goals of the program were to design an appropriate…

  1. Automated Program Analysis for Cybersecurity (APAC)

    DTIC Science & Technology

    2016-07-14

    AUTOMATED PROGRAM ANALYSIS FOR CYBERSECURITY (APAC) FIVE DIRECTIONS, INC JULY 2016 FINAL TECHNICAL REPORT APPROVED... CYBERSECURITY (APAC) 5a. CONTRACT NUMBER FA8750-14-C-0050 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 61101E 6. AUTHOR(S) William Arbaugh...AC Team Adversarial Challenge Team, responsible for creating malicious applications APAC Automated Program Analysis for Cybersecurity BAE BAE Systems

  2. NWHSS Implement Family Member Assessment Component in the Millennium Cohort Study

    DTIC Science & Technology

    2014-12-01

    Surveys: The Tailored Design Method, 3rd edition , Hoboken, NJ, John Wiley & Sons. Dillman D.A., Smyth J.D., Christian L.M., O’Neill A. (2008) Will a...TYPE Final Report 3 . DATES COVERED (From - To) 28 Sep 2009 – 27 Sep 2014 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER NWHSS...23 3 . Key Research Accomplishments

  3. Evaluating the Longevity and Hydraulic Performance of Permeable Reactive Barriers at Department of Defense Sites

    DTIC Science & Technology

    2001-10-01

    Draft Final Report Evaluating the Longevity and Hydraulic Performance of Permeable Reactive Barriers at Department of Defense Sites Prepared for...AND SUBTITLE Evaluating the Longevity and Hydraulic Performance of Permeable Reactive Barriers at Department of Defense Sites 5a. CONTRACT NUMBER...34 4.3.2 Hydraulic Performance Evaluation .................................................................... 38 4.3.2.1 Water-Level

  4. Solar Heating Experiment on the Grover Cleveland School, Boston, Massachusetts. Final Report.

    ERIC Educational Resources Information Center

    General Electric Co., Philadelphia, PA. Space Div.

    General Electric Company was one of four contractors who received a contract in early January 1974 to design, build, and install a solar heating experiment in a public school. The overall objective of this program was to obtain data that would assist in evaluating the applicability of solar heating systems in large metropolitan areas. This data…

  5. Fundamental Structure of High-Speed Reacting Flows: Supersonic Combustion and Detonation

    DTIC Science & Technology

    2016-04-30

    AFRL-AFOSR-VA-TR-2016-0195 Fundamental Structure of High-Speed Reacting Flows: Supersonic Combustion and Detonation Kenneth Yu MARYLAND UNIV COLLEGE...MARCH 2016 4. TITLE AND SUBTITLE FUNDAMENTAL STRUCTURE OF HIGH-SPEED REACTING FLOWS: SUPERSONIC COMBUSTION AND DETONATION 5a. CONTRACT NUMBER...public release. Final Report on Fundamental Structure of High-Speed Reacting Flows: Supersonic Combustion and Detonation Grant

  6. Vibration Attenuation of the NASA Langley Evolutionary Structure Experiment Using H(infinity) and Structured Singular Value (mu) Robust Multivariable Control Techniques

    NASA Technical Reports Server (NTRS)

    Balas, Gary J.

    1996-01-01

    This final report summarizes the research results under NASA Contract NAG-1-1254 from May, 1991 - April, 1995. The main contribution of this research are in the areas of control of flexible structures, model validation, optimal control analysis and synthesis techniques, and use of shape memory alloys for structural damping.

  7. Reconstruction of Past Climatic Proxy Series

    DTIC Science & Technology

    1975-08-29

    DEPARTMENT OF COMMERCE i —i mm^tmatmmiimmt^ 1—’ — *mm ’■ J ^mm^mmw^^^^mw^m ^’"■’ ’ ( "wnTTTTOrfTTTff’ SECURITY CLASSIflCATIQN OF THIJ ^»Og fl...h«n /•«(• EnforcJ) I. REPORT NUMBER REPORT DOCUMENTATION PAGE IT COV.’ *e< ESSIOK NO 4. TITLE C«nifSLibriil« j RECONSTRUCTION OF PAST...PERIOD COVERED Final Technical Report 7/1/74 - 6/30/75 «• PERFORMING ORG. REPORT NUMBE1 C CONTRACT OR GRANT NUMBERf» J F44620-75-C-0055 9

  8. Neurology Falls. Patient Falls Risk Assessment, Neurology Clinic, Johns Hopkins Hospital, Baltimore, MD

    DTIC Science & Technology

    2009-07-06

    currently valid ()MB control number. PLEASE DO NOT RETURN YOf IR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 21 JUL 2008 2. REPORT TYPE Final...Hospital, Baltimore, MD 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) LT John M Gardner, MSC, USN 5d. PROJECT...NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Johns Hopkins Hospital, Baltimore, MD Residency Site

  9. Additional Smooth and Rough Water Trials of SKI-CAT.

    DTIC Science & Technology

    1981-08-01

    REPORT & PERIOD COVERED ADDITIONAL SMOOTH AND ROUGH WATER TRIALS OF FINAL SKI- CAT S. PERFORMING ORO. REPORT NUMSER 7. AUTHOR() I. CONTRACT OR GRANT NUMUr...Identif by bloc membe) ’ " -Further tests of SKI- CAT were made in smooth and rough water. Smooth water results confirmed the performance results of...reductions in the accelerations and motions of SKI- CAT over against the head seasreut DD , +A ,3 1473 EDITION OF I NOVS IS OBSOLETE UNCIbSJFIED SIME 0102-014

  10. 24th Current Trends in Computational Chemistry

    DTIC Science & Technology

    2017-05-17

    Standard Form 298 (Rev 8/98) Prescribed by ANSI Std. Z39.18 Final Report W911NF-16-1-0470 69708-CH-CF.1 601-979-3723 a. REPORT 14. ABSTRACT 16...5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO...number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. Jackson State University 1400 John R. Lynch Street Jackson, MS 39217 -0002 Agency Code

  11. Hawaii Energy and Environmental Technologies (HEET) Initiative Phase 4

    DTIC Science & Technology

    2006-08-01

    UNIVERSITY OF HAWAII1 AT MANOA School of Ocean and Earth Science and Technology Hawal’i Natural Energy Institute January 10, 2007 Dr. Michele L...Report: HEET Initiative: Grant N00014-04-1-0682 Enclosed you will find a copy of the Final Technical Report for the subject grant, titled Hawaii Energy and...TITLE AND SUBTITLE 5a. CONTRACT NUMBER Hawaii Energy and Environmental Technologies (HEET) Initiative Phase 4 5b. GRANT NUMBER N00014-04-1-0682 5c

  12. A regional technology transfer program

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The final report is presented for the North Carolina Science and Technology Research Center's 14th consecutive contract period as a NASA Industrial Applications Center, serving the information needs of nine Southeastern states. Included in the report are figures for and analysis of marketing efforts, file usage, search delivered, and other services performed for clients; and information on staff changes, workshops, and special projects in 1978. An appendix contains copies of NC/STRC magazine advertisements, letters from clients, and supplementary information on NC/STRC staff and services.

  13. Contribution of AMACR and Phytanic Acid to Prostate Cancer Risk Among African Americans in North Carolina

    DTIC Science & Technology

    2009-05-01

    ABOVE ADDRESS. 1. REPORT DATE 1 May 2009 2 . REPORT TYPE Final 3. DATES COVERED 15 Jan 2006 – 14 Apr 2009 4. TITLE AND SUBTITLE 5a. CONTRACT...North Carolina. 2 . The total of 518 subjects is slightly short of our goal. However, we exceeded our recruitment goals for control subjects, and...data we have collected will have the greatest possible impact in the fight against PCa. Task 2 . To identify sequence variant/mutation spectrum of

  14. A Neutron Radiography System for Field Use

    DTIC Science & Technology

    1989-06-01

    provoked a major renewal of interest in neutron radiography because it promises to bring neutron radiography to the workplace , a convenience provided...II I~F I C II i IiH i ii MTL TR 89-52 I-AD A NEUTRON RADIOGRAPHY SYSTEM N FOR FIELD USE e~m JOHN J. ANTAL and ALFRED S. MAROTTA, and LOUIS J. FARESE...COVERED A NEUTRON RADIOGRAPHY SYSTEM FOR FIELD USE Final Report 6. PERFORMING OR1. REPORT NUMBER 7. AUTHOR(s) S. CONTRACT OR GRANT NUMBER(s) John J

  15. Ural-Tweed Bighorn Sheep Wildlife Mitigation Project, 1984-1990 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Lewis R.; Yde, Chris A.

    The results of habitat improvement project activities accomplished under contract No.84-38 for bighorn sheep mitigation along Koocanusa Reservoir from September 1, 1984, through June 30, 1990, are reported here. Habitat treatments were applied to ten areas and covered 1100 acres. Treatments used were prescribed fire, slashing combined with prescribed fire, and fertilization. Several variations in season or intensity were used within the slashing and prescribed fire treatments. This project was coordinated with and complemented concurrent Kootenai National Forest habitat improvement activities.

  16. Scattering from inclusions in Marine Sediments: SAX04 Data/Model Comparisons

    DTIC Science & Technology

    2008-07-14

    cfk /2π= , δβ k2= and )1( δinn o += are the wave number , attenuation coefficient and complex refraction index of the...08-14-2008 2. REPORT TYPE Final Technical 3. DATES COVERED (From - To) Oct 2000 – Sep 2008 5a. CONTRACT NUMBER 5b. GRANT NUMBER N00014-01...University of Washington 1013 NE 40th St. Seattle, WA 98105-6698 8. PERFORMING ORGANIZATION REPORT NUMBER 10. SPONSOR/MONITOR’S ACRONYM(S)

  17. Active and Passive Remote Sensing of Ice

    DTIC Science & Technology

    1993-01-26

    92 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Active and Passive Remote Sensing of Ice NO0014-89-J-l 107 6. AUTHOR(S) 425f023-08 Prof. J.A. Kong 7... REMOTE SENSING OF ICE Sponsored by: Department of the Navy Office of Naval Research Contract number: N00014-89-J-1107 Research Organization: Center for...J. A. Kong Period covered: October 1, 1988 - November 30, 1992 St ACTIVE AND PASSIVE REMOTE SENSING OF ICE FINAL REPORT This annual report covers

  18. Using Al Foam to Reduce the Transfer of Impact Stress between Ceramic Plates

    DTIC Science & Technology

    2004-11-01

    2004 Using Al foam to reduce the transfer of impact stress between ceramic plates. Final Technical Report No.2 by Ing. Milos Bortel November 2004...United States Army EUROPEAN RESEARCH OFFICE OF THE U.S.ARMY London, England CONTRACT NUMBER N62558-03-M-0815 ZTS-MATEC, a.s. Areal ZTS No.924 018 41...Dubnica nad Vahom Slovakia Approved for public release, distribution unlimited. Report Documentation Page Form ApprovedOMB No. 0704-0188 Public

  19. Coronal Abundances and Their Variation

    NASA Technical Reports Server (NTRS)

    Saba, Julia L. R.

    1996-01-01

    This contract supported the investigation of elemental abundances in the solar corona, principally through analysis of high-resolution soft X-ray spectra from the Flat Crystal Spectrometer on NASA's Solar Maximum Mission. The goals of the study were a characterization of the mean values of relative abundances of elements accessible in the FCS data, and information on the extent and circumstances of their variability. This is the Final Report, summarizing the data analysis and reporting activities which occurred during the period of performance, June 1993 - December 1996.

  20. Supersonic Post-Combustion Inertial CO 2 Extraction System Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balepin, Vladimir

    This report summarizes the effort carried out under NETL contract DE- FE0013122 from 1 October 2013 to 31 March 2017. As described in this document, technical challenges realized during the performance of this project resulted in completion of only the first two of three planned budget periods. Despite this outcome, substantial progress was made toward understanding and maturing the CO 2 capture technology under consideration and considerable future promise remains for applications requiring lower CO 2 capture and/or lower CO 2.

  1. Risk management. National Aeronautics and Space Administration (NASA). Interim rule adopted as final with changes.

    PubMed

    2000-11-22

    This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.

  2. 77 FR 75780 - Nondisplacement of Qualified Workers Under Service Contracts; Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... of Qualified Workers Under Service Contracts; Effective Date AGENCY: Wage and Hour Division, Department of Labor. ACTION: Final rule; notice of effective date and OMB approval of information collection requirements. SUMMARY: The Department of Labor announces the effective date of its Final Rule published on...

  3. Additional Technologies and Investigations for Provision of Future Aeronautical Communications

    NASA Technical Reports Server (NTRS)

    Gilbert, Tricia; Jin, Jenny; Berger, Jason; Henriksen, Steve

    2008-01-01

    The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.

  4. 48 CFR 42.707 - Cost-sharing rates and limitations on indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... final indirect cost rate ceiling in a contract. Examples of such circumstances are when the proposed... ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42... authorized, may call for the contractor to participate in the costs of the contract by accepting indirect...

  5. 42 CFR 423.643 - Effect of contract determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Effect of contract determination. 423.643 Section 423.643 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Determinations and Appeals § 423.643 Effect of contract determination. The contract determination is final and...

  6. 42 CFR 422.646 - Effect of contract determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Effect of contract determination. 422.646 Section 422.646 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Appeals § 422.646 Effect of contract determination. The contract determination is final and binding unless...

  7. NDI method for quantification of weak bonding strength of composite structures. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, R.F.

    This Phase 1 Final Report is for a Small Business Innovation Research program conducted for the Navy under Federal Contract N00189-96-M-JT09. The purpose was to investigate ways to determine the overall strength of a composite structure by using a nondestructive evaluative (NDE) optical technique, shearography. The purpose of the research was to determine if there is an effective way to assess the strength of composite components on in-service aircraft rather than in the front end of the composite manufacturing process. The goal was to determine the overall feasibility of such an NDE method, and to investigate various means of probingmore » the material under test.« less

  8. Simulating muscular thin films using thermal contraction capabilities in finite element analysis tools.

    PubMed

    Webster, Victoria A; Nieto, Santiago G; Grosberg, Anna; Akkus, Ozan; Chiel, Hillel J; Quinn, Roger D

    2016-10-01

    In this study, new techniques for approximating the contractile properties of cells in biohybrid devices using Finite Element Analysis (FEA) have been investigated. Many current techniques for modeling biohybrid devices use individual cell forces to simulate the cellular contraction. However, such techniques result in long simulation runtimes. In this study we investigated the effect of the use of thermal contraction on simulation runtime. The thermal contraction model was significantly faster than models using individual cell forces, making it beneficial for rapidly designing or optimizing devices. Three techniques, Stoney׳s Approximation, a Modified Stoney׳s Approximation, and a Thermostat Model, were explored for calibrating thermal expansion/contraction parameters (TECPs) needed to simulate cellular contraction using thermal contraction. The TECP values were calibrated by using published data on the deflections of muscular thin films (MTFs). Using these techniques, TECP values that suitably approximate experimental deflections can be determined by using experimental data obtained from cardiomyocyte MTFs. Furthermore, a sensitivity analysis was performed in order to investigate the contribution of individual variables, such as elastic modulus and layer thickness, to the final calibrated TECP for each calibration technique. Additionally, the TECP values are applicable to other types of biohybrid devices. Two non-MTF models were simulated based on devices reported in the existing literature. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. 50 kW on-site concentrating solar photovoltaic power system. Phase I: design. Final report, 1 June 1978-28 February 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pittman, P F

    1979-03-30

    This contract is part of a three phase program to design, fabricate, and operate a solar photovoltaic electric power system with concentrating optics. The system will be located beside a Local Operating Headquarters of the Georgia Power Company in Atlanta, Georgia and will provide part of the power for the on-site load. Fresnel lens concentrators will be used in 2-axis tracking arrays to focus solar energy onto silicon solar cells producing a peak power output of 56 kW. The present contract covers Phase I which has as its objective the complete design of the system and necessary subsystems.

  10. Mobile LNG (liquified natural gas) gelator. Final report, July 1980-September 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rudnicki, M.I.; Hoffman, L.C.; Newton, R.A.

    1981-12-01

    Gelled liquified natural gas (GELNG) offers potential safety advantages over LNG in the case of an accidental spill. GELNG has shown reduced spread area, lower vaporization rate, and crack sealing capability relative to the ungelled material. The purpose of this contract was to develop a mobile, continuous gelator which would produce a minimum of one cubic meter per hour of GELNG; previously, GELNG had been produced in small quantities by batch processes. Major achievements under the contract were the design and construction of the mobile gelator, checkout of the system with liquid nitrogen, and testing of the system on LNG.more » GELNG was not produced in the test series.« less

  11. RAPTOR Transmissivity and Cloud Climatology Study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eis, K.E.; Vonder Haar, T.H.; Forsythe, J.

    1993-01-01

    The RAPTOR Transmissivity Study (RTS) was funded by Lawrence Livermore National Laboratory (LLNL) under a sub contract to support the U.S. Army`s RAPTOR program. The intent of the study is to answer two questions: (1) What are the typical transmission levels of clouds as a function of target altitude for two locations and wavelengths of interest? (2) What is the probability that a cloud will intervene between sensor and target for a given target altitude, range, wavelength and location? This was addressed for Iraq and Korea. Answers to both questions are treated using existing software and data sources where possiblemore » due to the limited funding and scope of the contract.« less

  12. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  13. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  14. 76 FR 13329 - Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ..., Release of Claims, for releases of claims under construction and building service contracts, was... prescribed the use of GSA Form 1142 for releases of claims under construction and building service contracts...] RIN 3090-AJ13 Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building...

  15. 77 FR 26763 - General Services Administration Acquisition Regulation; Submission for OMB Review; Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... Claims, regarding final payment under construction and building services contract. GSA Form 1142 was... construction and building services contractors to submit a release of claims before final payment is made to... (GSAR Parts 532 and 552.232-72; GSA Form 1142 Release of Claims) AGENCY: Office of the Chief Acquisition...

  16. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  17. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  18. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  19. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  20. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  1. Experimental Investigation of Free Field and Shock-Initiated Implosion of Composite Structures

    DTIC Science & Technology

    2017-02-06

    From- To) 06 - 02 - 2017 Final Report Nov . 2013 - De c . 2016 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Experimental I nvestigation of Free Fie l d...of experimental studies is perfor med to study the implos i on behavior of a variety of different composite structures under varying loading...Introduction Materials Experimental Procedure DIC Technique Collapse Pressure Predictions Specific and Total Impulse

  2. Phenomenological Studies in Micromechanics

    DTIC Science & Technology

    1988-09-30

    DTIO OELECTE NOV 0 9 1 i FINAL REPORT OFFICEF NAVAL RSEARCH Contract No. N00014-86-K-0255 PHENOMENOLOGICAL STUDIES IN MICROMECHANICS 0. Post, and R...9 Improvement of Experimental Techniques.................. 10 *Summary of Research Progress ........................... 11 LIST OF...15 Q 9%. INI C RA&I P ’-zC TAB3 -:o * A,1 EXECUTIVE SIJOARY State of the art experimental techniques have been applied to

  3. Indigenous Acoustic Detection.

    DTIC Science & Technology

    1982-01-26

    RESEARCH Contract #NO0014-80-C--0829 Task No. NR 139-004 FINAL REPORT Indigenous Acoustic Detection by James J. Whitesefl Secondary Education/Biology...methodology. DTIC. CD-58-PL. Lloyd, J. E. 1981. Personnel communication . Nevo, E. and S. A. Blondheim. 1972. Acoustic isolation in the speciation of...6. Walker, T. J. 1981. Personnel communication . *Walker, T. J. and J. J. Whitesell. 1981. Singing schedules and sites for a tropical burrowing

  4. PRiFi Networking for Tracking-Resistant Mobile Computing

    DTIC Science & Technology

    2017-11-01

    PRiFi NETWORKING FOR TRACKING-RESISTANT MOBILE COMPUTING YALE UNIVERSITY NOVEMBER 2017 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE...From - To) FEB 2016 – MAY 2017 4. TITLE AND SUBTITLE PRiFi NETWORKING FOR TRACKING-RESISTANT MOBILE COMPUTING 5a. CONTRACT NUMBER FA8750-16-2-0034...3 Figure 2: What We Have: A Cloud of Secret Mass Surveillance Processes .................................. 6 Figure 3: What

  5. Innovative Phase Change Approach for Significant Energy Savings

    DTIC Science & Technology

    2016-09-01

    September 2016 Innovative Phase Change Approach For Significant Energy Savings September 2016 8 After conducting a market survey...FINAL REPORT Innovative Phase Change Approach for Significant Energy Savings ESTCP Project EW-201138 SEPTEMBER 2016 Dr. Aly H Shaaban Applied...5a. CONTRACT NUMBER W912HQ-11-C-0011 Innovative Phase Change Approach for Significant Energy Savings 5b. GRANT NUMBER 5c. PROGRAM

  6. Final Report on Contract F49620-85-C-0026. Volume 1.

    DTIC Science & Technology

    1987-05-01

    RFOSR-TR-S?-1349-VOL-1 UNCLMSSIFIED F40-BS-C46F/ 20/4 L E.EEEEEEEEE.E. 0 0 ’El..... oso - ~L.0 3 111IL25 . MJCROC(OP RESOLUTION TEST CHARI WiloUiAl SURIAU...Yakhot, R. Panda , U. Frisch, and R.H. Kraichnan, Weak Interactions and Local Order in Strong Turbulence, Phys. Rev. Let. (1986) submitted. -3- V. Yakhot

  7. Technical Feasibility Study of an Effective Low-Toxicity Obscurant Material

    DTIC Science & Technology

    2012-08-01

    2. REPORT TYPE FINAL 3. DATES COVERED (From - To) 04/2011 – 07/2012 4 . TITLE AND SUBTITLE 5a. CONTRACT NUMBER W912HQ-11-C-0034 Technical...6 4 Work Package 3 – Laboratory-scale tests...chemistry to sea-salt aerosol. 4 The major component of sea-salt is sodium chloride. Sodium chloride can be very simply generated by the combustion

  8. Applications of Laser Scattering Probes to Turbulent Diffusion Flames

    DTIC Science & Technology

    1983-11-01

    APPLICATIONS OF LASER SCATTERING PROBES TO TURBULENT DIFFUSION FLAMES u ^ j FINAL REPORT Contract N00014-80-C-0882 Submitted to Office of...Include Security Classification) Applications of Laser Scattering Probes to Turbulent Diffusion Flames PROJECT NO. TASK NO. WORK UNIT NO. 12...for a co-flowing jet turbulent diffusion flame, and planar laser-induced fluorescence to provide two- dimensional instantaneous images of the flame

  9. Secure Location Provenance for Mobile Devices

    DTIC Science & Technology

    2015-07-01

    SECURE LOCATION PROVENANCE FOR MOBILE DEVICES UNIVERSITY OF ALABAMA AT BIRMINGHAM JULY 2015 FINAL TECHNICAL REPORT...PROVENANCE FOR MOBILE DEVICES 5a. CONTRACT NUMBER FA8750-12-2-0254 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 69220K 6. AUTHOR(S) Ragib Hasan...based services allow mobile device users to access various services based on the users’ current physical location information. Path-critical applications

  10. Acoustic Communications and Navigation for Mobile Under-Ice Sensors

    DTIC Science & Technology

    2017-02-04

    From- To) 04/02/2017 Final Report 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Acoustic Communications and Navigation for Mobile Under-Ice Sensors...development and fielding of a new acoustic communications and navigation system for use on autonomous platforms (gliders and profiling floats) under the...contact below the ice. 15. SUBJECT TERMS Arctic Ocean, Undersea Workstations & Vehicles, Signal Processing, Navigation, Underwater Acoustics 16

  11. Screen Fingerprints as a Novel Modality for Active Authentication

    DTIC Science & Technology

    2014-03-01

    and mouse dynamics [9]. Some other examples of the computational behavior metrics of the cognitive fingerprint include eye tracking, how Approved...SCREEN FINGERPRINTS AS A NOVEL MODALITY FOR ACTIVE AUTHENTICATION UNIVERSITY OF MARYLAND MARCH 2014 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC...COVERED (From - To) MAY 2012 – OCT 2013 4. TITLE AND SUBTITLE SCREEN FINGERPRINTS AS A NOVEL MODALITY FOR ACTIVE AUTHENTICATION 5a. CONTRACT

  12. Organizational Decisions.

    DTIC Science & Technology

    1982-03-01

    empirical outcomes. Since performance depends on the probabilities of obtaining valued outcomes ( Vroom , 1964), effort should be enhanced by easy goals...COVERED ORGANIZATIONAL DECISIONS FINAL 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(s) 0. CONTRACT OR GRANT NUMBER(e) BERNARD M. BASS NO 0014-80-CO438 9... PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK AREA a WORK UNIT NUMBERSBERNARD M. BASS, Ph.D. 2135 WEST IIAMTON ROAD

  13. A Study of Placing Army Requirements on Contract

    DTIC Science & Technology

    2016-04-01

    perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011

  14. Low Cost, Efficient Microcavity Plasma Ozone Generation for Water Remediation and Air Purification

    DTIC Science & Technology

    2012-06-01

    Eliasson, and M. Hirth, “ Ozone Generation from Oxygen and Air: Discharge Physics and Reaction Mechanisms,” Ozone Sci. and Eng., vol. 10, pp. 367-378...Phase I Final Report: Low Cost, Efficient Microcavity Plasma Ozone Generation for Water Remediation and Air Purification...Contract Number: FA9550-11-C-0087 June 2012 Low Cost, Efficient Microcavity Plasma Ozone Generation for Water Remediation

  15. Manned Mars System Study (MMSS): Mars transportation and facility infrastructure study. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Manned Mars System Study (MMSS) was conducted for the Marshall Space Flight Center (MSFC) over the 35 month period between May 15, 1987 and April 30, 1990. During the course of the study, the NASA Office of Exploration (OEXP; Code Z) was created and MSFC was subsequently designated the Transportation Integration Agent (TIA) for support of the OEXP Mission Analysis and Systems Engineering (MASE) team. As a result of this action, modifications to the contract redirected the efforts to be consistent with NASA's overall objectives, including lunar transportation system design. A large number of written submittals were required in order to provide TIA support to MASE. A list summarizing the documents which have been prepared and delivered by Martin Marietta under this contract during the course of this work is presented. In nearly all cases, full sets of view-graphs were also provided to the MSFC COTR, and in several cases magnetic media were provided as well. To incorporate all of these materials (more than 2,000 pages) into the present report would obviously produce an extremely unwieldy and confusing document. Therefore, a summary of key findings are presented in this final report, supplemented by other material produced under this contract but not already available in the widespread literature.

  16. Evaluation of aftermarket LPG conversion kits in light-duty vehicle applications. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bass, E A

    1993-06-01

    SwRI was contracted by NREL to evaluate three LPG conversion kits on a Chevrolet Lumina. The objective of the project was to measure the Federal Test Procedure (FTP) emissions and fuel economy of these kits, and compare their performance to gasoline-fueled operation and to each other. Varying LPG fuel blends allowed a preliminary look at the potential for fuel system disturbance. The project required kit installation and adjustment according to manufacturer`s instructions. A limited amount of trouble diagnosis was also performed on the fuel systems. A simultaneous contract from the Texas Railroad Commission, in cooperation with NREL, provided funds formore » additional testing with market fuels (HD5 propane and industry average gasoline) and hydrocarbon (HC) emissions speciation to determine the ozone-forming potential of LPG HC emissions. This report documents the procurement, installation, and testing of these LPG conversion kits.« less

  17. Minority On-Line Information Service (MOLIS): A minority research and education information service. Final report for Department of Energy Grant No. DE-FG02-90ER75602

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodman, John A.

    MOLIS is an online database of minority institutions, and is used by federal agencies to identify peer reviewers and by majority institutions to identify possible collaborations and sub-contracts. MOLIS includes in-depth information about the research and educational capabilities of Historically Black Colleges and Universities (HBCUs), Hispanic Serving Institutions (HSIs), and Tribal Colleges. Included with this report are several annual progress reports, a list of all minority institutions currently on MOLIS, a list of outreach activities, etc.

  18. The CSM testbed matrix processors internal logic and dataflow descriptions

    NASA Technical Reports Server (NTRS)

    Regelbrugge, Marc E.; Wright, Mary A.

    1988-01-01

    This report constitutes the final report for subtask 1 of Task 5 of NASA Contract NAS1-18444, Computational Structural Mechanics (CSM) Research. This report contains a detailed description of the coded workings of selected CSM Testbed matrix processors (i.e., TOPO, K, INV, SSOL) and of the arithmetic utility processor AUS. These processors and the current sparse matrix data structures are studied and documented. Items examined include: details of the data structures, interdependence of data structures, data-blocking logic in the data structures, processor data flow and architecture, and processor algorithmic logic flow.

  19. Development of a model for predicting NASA/MSFC program success

    NASA Technical Reports Server (NTRS)

    Riggs, Jeffrey; Miller, Tracy; Finley, Rosemary

    1990-01-01

    Research conducted during the execution of a previous contract (NAS8-36955/0039) firmly established the feasibility of developing a tool to aid decision makers in predicting the potential success of proposed projects. The final report from that investigation contains an outline of the method to be applied in developing this Project Success Predictor Model. As a follow-on to the previous study, this report describes in detail the development of this model and includes full explanation of the data-gathering techniques used to poll expert opinion. The report includes the presentation of the model code itself.

  20. 77 FR 18106 - Award Fee for Service and End-Item Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    .... SUMMARY: NASA has adopted, without change, a final rule amending the NASA FAR Supplement (NFS) to update the Award Fee for Service Contracts clause (NFS 1852.216-76) to clarify that the amount of award fee... Award Fee for End-Item Contracts clause (NFS 1852.216-77) to allow the contracting officer to withhold...

  1. 78 FR 48716 - Notice of Availability of the Final Environmental Impact Statement for the Arkansas Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Reservoir to store up to 29,938 acre-feet of water. A long-term storage contract, rather than short-term... Availability of the Final Environmental Impact Statement for the Arkansas Valley Conduit and Long-Term Excess... Valley Conduit (AVC) and Long-Term Excess Capacity Contract, Fryingpan-Arkansas Project, Colorado, is...

  2. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  3. 25 CFR 256.20 - How are these repairs or construction trades persons, home building contractors, or construction...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... statement of work, which identifies the work to be performed. The appropriate contracting office uses the... completing the project as advertised. (a) Payments to the winning bidder are negotiated in the contract and... the completed work. (2) Final payment will be made after final inspection and after all provisions of...

  4. NASA satellite communications application research, phase 2 addendum. Efficient high power, solid state amplifier for EHF communications

    NASA Technical Reports Server (NTRS)

    Benet, James

    1994-01-01

    This document is an addendum to the NASA Satellite Communications Application Research (SCAR) Phase 2 Final Report, 'Efficient High Power, Solid State Amplifier for EHF Communications.' This report describes the work performed from 1 August 1993 to 11 March 1994, under contract number NASW-4513. During this reporting period an array of transistor amplifiers was repaired by replacing all MMIC amplifier chips. The amplifier array was then tested using three different feedhorn configurations. Descriptions, procedures, and results of this testing are presented in this report, and conclusions are drawn based on the test results obtained.

  5. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

  6. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  7. Medicare program; hospital outpatient prospective payment system and CY 2007 payment rates; CY 2007 update to the ambulatory surgical center covered procedures list; Medicare administrative contractors; and reporting hospital quality data for FY 2008 inpatient prospective payment system annual payment update program--HCAHPS survey, SCIP, and mortality. Final rule with comment period and final rule.

    PubMed

    2006-11-24

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system, and to implement certain related provisions of the Medicare Prescription Drug, Improvement, and Modernization Act (MMA) of 2003 and the Deficit Reduction Act (DRA) of 2005. In this final rule with comment period, we describe changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2007. In addition, this final rule with comment period implements future CY 2009 required reporting on quality measures for hospital outpatient services paid under the prospective payment system. This final rule with comment period revises the current list of procedures that are covered when furnished in a Medicare-approved ambulatory surgical center (ASC), which are applicable to services furnished on or after January 1, 2007. This final rule with comment period revises the emergency medical screening requirements for critical access hospitals (CAHs). This final rule with comment period supports implementation of a restructuring of the contracting entities responsibilities and functions that support the adjudication of Medicare fee-for-service (FFS) claims. This restructuring is directed by section 1874A of the Act, as added by section 911 of the MMA. The prior separate Medicare intermediary and Medicare carrier contracting authorities under Title XVIII of the Act have been replaced with the Medicare Administrative Contractor (MAC) authority. This final rule continues to implement the requirements of the DRA that require that we expand the "starter set" of 10 quality measures that we used in FY 2005 and FY 2006 for the hospital inpatient prospective payment system (IPPS) Reporting Hospital Quality Data for the Annual Payment Update (RHQDAPU) program. We began to adopt expanded measures effective for payments beginning in FY 2007. In this rule, we are finalizing additional quality measures for the expanded set of measures for FY 2008 payment purposes. These measures include the HCAHPS survey, as well as Surgical Care Improvement Project (SCIP, formerly Surgical Infection Prevention (SIP)), and Mortality quality measures.

  8. Weighing the Contract Option.

    ERIC Educational Resources Information Center

    Dervarics, Charles

    1993-01-01

    Contracting for noneducational services is standard operating procedure in many school districts. Private contractors are involved in transportation, food service, maintenance, and even, in rare cases, instruction. Before deciding to contract out, school boards should examine improvement to school-run operations before making a final decision.…

  9. Range Riders and Game Wardens: A Brief History of Fort Bragg’s Forest Ranger Program

    DTIC Science & Technology

    2006-07-01

    Paulus recalls as many as 700 active fields during the 1960s. 21 Rye , corn, millet and other crops were planted. Evans recalls planting "everything from...ADDRESS. 1. REPORT DATE (DD-MM-YYY) 2. REPORT TYPE 3. DATES COVERED (From - To) 27-07-2006 Final 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Range Riders and...34. In 1967 the eight rangers covered 240,000 miles in their patrols. 26 While rangers were active throughout the year in various duties, life at most

  10. Application of the ALE and MBE Methods to the Growth of Layered Hg sub x Cd sub 1-x Te Films.

    DTIC Science & Technology

    1986-09-26

    films / We have studied the applicability of the Atomic Layer Epitaxy (ALE, vee Ref. -1pand Molecular Beam Epitaxy (MBE) ito growth of Hg2 Cdi- ,Te...thin- films throughout the composition range 0 x $ 0.8. The progress of the Contract has been reported periodically in five interim reports. This final...I separate sources) yielded films with high x values. On the grounds of these observations we do not find ALE suitable for growth of HgCdTe. 2) ALE

  11. Analysis of environmental factors impacting the life cycle cost analysis of conventional and fuel cell/battery-powered passenger vehicles. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report presents the results of the further developments and testing of the Life Cycle Cost (LCC) Model previously developed by Engineering Systems Management, Inc. (ESM) on behalf of the U.S. Department of Energy (DOE) under contract No. DE-AC02-91CH10491. The Model incorporates specific analytical relationships and cost/performance data relevant to internal combustion engine (ICE) powered vehicles, battery powered electric vehicles (BPEVs), and fuel cell/battery-powered electric vehicles (FCEVs).

  12. Artificial plasma experiments. Chemical release observations associated with the CRRES program

    NASA Technical Reports Server (NTRS)

    Mende, Stephen B.

    1994-01-01

    This report submitted is the final report and covers work performed under the contract for the period Apr. 12, 1985 - Dec. 23, 1993. The CRRES program investigated earth plasma environment by active experiments in which metal vapors were injected into the upper atmosphere and magnetosphere. The vapor clouds perturb the ambient ionospheric / magnetospheric environment and the effects could be monitored by passive observing instruments. Our part of the CRRES program, the Artificial Plasma Experiment program, was a ground based and aircraft based investigation to observe artificial chemical releases by optical techniques.

  13. Development of gallium arsenide high-speed, low-power serial parallel interface modules: Executive summary

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Final report to NASA LeRC on the development of gallium arsenide (GaAS) high-speed, low power serial/parallel interface modules. The report discusses the development and test of a family of 16, 32 and 64 bit parallel to serial and serial to parallel integrated circuits using a self aligned gate MESFET technology developed at the Honeywell Sensors and Signal Processing Laboratory. Lab testing demonstrated 1.3 GHz clock rates at a power of 300 mW. This work was accomplished under contract number NAS3-24676.

  14. Acquisition of Real Time Simulator for Intelligent Power Networks in Operational Energy Applications

    DTIC Science & Technology

    2017-12-05

    Standard Form 298 (Rev 8/98) Prescribed by ANSI Std. Z39.18 Final Report W911NF-16-1-0515 68926-RT-REP.1 210-458-5086 a. REPORT 14. ABSTRACT 16...5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO...information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. University of Texas at San

  15. Sodium-sulfur battery development. Phase VB final report, October 1, 1981--February 28, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1985-04-01

    This report describes the technical progress made under Contract No. DE-AM04-79CH10012 between the U.S. Department of Energy, Ford Aerospace & Communications Corporations and Ford Motor Company, for the period 1 October 1981 through 28 February 1985, which is designated as Phase VB of the Sodium-Sulfur Battery Development Program. During this period, Ford Aerospace held prime technical responsibility and Ford Motor Company carried out supporting research. Ceramatec, Inc., was a major subcontractor to Ford Aerospace for electrolyte development and production.

  16. Multi-Scale Texturing of Metallic Surfaces for High Performance Military Systems

    DTIC Science & Technology

    2015-08-17

    Standard Form 298 (Rev 8/98) Prescribed by ANSI Std. Z39.18 814-865-7397 W911NF-14-1-0566 66086-MS-II.5 Final Report a. REPORT 14. ABSTRACT 16...NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO. 0704-0188 3. DATES COVERED (From - To) - UU UU UU UU 17-08-2015 18-Aug-2014 17-May-2015...comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE

  17. Development and Demonstration of Advanced Technologies for Direct Electrochemical Oxidation of Hydrocarbons (Methanol, Methane, Propane)

    DTIC Science & Technology

    1994-07-01

    Propane) Final Report Prepared by: J.A. Kosek A.B. LaConti C.C. Cropley ŕ 1:July 1994 U.S. ARMY RESEARCH OFFICE Contract No. DAAL03-92-C-001 1 GINER, INC...LaConti, C.C. Cropley 7. PERFORMING ORGANIZATION NAME(S) AND AORESS(E5 U. PERFORMING ORGANIZATION GINER, INC. REPORT NUMBER 14 Spring Street Waltham...SCIENTIFIC PERSONNEL A.B. LaConti and J.A. Kosek - Principal Investigators; C.C. Cropley , G. Wilson, J. Unger, S. McCatty, A. Griffith, and M. Hamdan

  18. Development of Technologies to Utilize Laser Plasma Radiations Sources for Radiation Effects Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, J F

    2007-01-31

    This final report will cover work performed over the period of November 11, 2005 to September 30, 2006 on the contract to develop technologies using laser sources for radiation effects sciences. The report will discuss four topic areas; the laser source experiments on the Gekko Laser at Osaka, Japan, planning for the Charge State Freeze Out experiments to be performed in calendar year 2007, a review of previous xenon gasbags on the LANL Trident laser to provide planning support to the May-June 2007 HELEN experiments.

  19. The Double R Theory of Language Comprehension

    DTIC Science & Technology

    2004-02-01

    AFRL-HE-AZ-TR- 2003 - 0110 Approved for public release; distribution is unlimited. AIR FORCE MATERIEL COMMAND AIR FORCE RESEARCH LABORATORY Human...REPORT TYPE Final 3. DATES COVERED (From - To) March 2003 to February 2004 5a. CONTRACT NUMBER F41624-97-D-5000 5b. GRANT NUMBER 4. TITLE...Laboratory Human Effectiveness Directorate Warfighter Training Research Division 6030 South Kent Street Mesa AZ 85212-6061 AFRL-HE-AZ-TR- 2003

  20. Research on Gyrotrons.

    DTIC Science & Technology

    1985-04-15

    pace. The advent of the intense pulsed relativistic electron beam renewed the interest in the cyclotron maser mechanism as a source of high power...Acknowledgement The author would like to express his gratitude to his advisor , Professor Jay L. Hirshfield, for the indefatigable scientific discussion which...YALE UNIVERSIT N FINAL REPORT To The Office of Naval Research [! Lf For Contract N00014-80-C-0075 y b IApplied Physics Section Yale University, New

  1. Advanced Single-Polymer Nanofiber-Reinforced Composite - Towards Next Generation Ultralight Superstrong/Tough Structural Material

    DTIC Science & Technology

    2015-04-29

    AFRL-OSR-VA-TR-2015-0144 ADVANCED SINGLE-POLYMER NANOFIBER-REINFORCED COMPOSITE YURIS DZENIS UNIVERSITY OF NEBRSKA Final Report 04/29/2015... COMPOSITE - TOWARDS NEXT GENERATION ULTRALIGHT SUPERSTRONG/TOUGH STRUCTURAL MATERIAL 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-11-1-0204 5c. PROGRAM...characterize their mechanical behavior and properties; and (3) fabricate and characterize polyimide nanofiber-reinforced composites . Continuous

  2. Dynamic Information Collection and Fusion

    DTIC Science & Technology

    2015-12-02

    AFRL-AFOSR-VA-TR-2016-0069 DYNAMIC INFORMATION COLLECTION AND FUSION Venugopal Veeravalli UNIVERSITY OF ILLINOIS CHAMPAIGN Final Report 12/02/2015...TITLE AND SUBTITLE Dynamic Information Collection and Fusion 5a. CONTRACT NUMBER FA9550-10-1-0458 5b. GRANT NUMBER AF FA9550-10-1-0458 5c. PROGRAM...information collection, fusion , and inference from diverse modalities Our research has been organized under three inter-related thrusts. The first thrust

  3. Ultrafast Spectroscopy of Proton-Coupled Electron Transfer (PCET) in Photocatalysis

    DTIC Science & Technology

    2016-07-08

    AFRL-AFOSR-VA-TR-2016-0244 Ultrafast Spectroscopy of Proton-Coupled Electron Transfer (PCET) in Photocatalysis Jahan Dawlaty UNIVERSITY OF SOUTHERN...TITLE AND SUBTITLE Ultrafast Spectroscopy of Proton-Coupled Electron Transfer (PCET) in Photocatalysis 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550...298 Back (Rev. 8/98) DISTRIBUTION A: Distribution approved for public release. Final Report: AFOSR YIP Grant FA9550-13-1-0128: Ultrafast Spectroscopy

  4. Military Vision Research Program

    DTIC Science & Technology

    2011-02-01

    present in vitreous appears to associate with the extracellular domain of PDGFRα • Galectin 3 was identified by mass spec as one of the vitreal...proteins that bound to the extracellular domain of PDGFRα • Recombinant galectin 3 did not prevent PDGF from activating PDGFRα, and is therefore not...February 28, 2011 2. REPORT TYPE Final 3 . DATES COVERED (From - To) 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER W81XWH-09-2-0091

  5. Coherent Structures in Plasmas Relevant to Electric Propulsion

    DTIC Science & Technology

    2016-06-24

    AFRL-AFOSR-VA-TR-2016-0229 Coherent Structures in Plasmas Relevant to Electric Propulsion Mark Cappelli LELAND STANFORD JUNIOR UNIV CA Final Report...TITLE AND SUBTITLE Coherent Structures in Plasmas Relevant to Electric Propulsion 5a. CONTRACT NUMBER N/A 5b. GRANT NUMBER FA9550-14-1-0017 5c...to propulsion devices through experimental, theoretical, and numerical studies. 15. SUBJECT TERMS Plasma instabilities in magnetized discharges

  6. Multiaperture Optical System Research.

    DTIC Science & Technology

    1987-11-06

    pp. 179-185 (1965). 6. Welford, W. T. and Winston , R., The Optics of Nonimaging Concentrators , P. 3, Academic Press, New York (1978). 7. Schneider, R...Welford and Winston investigated it was a possible concentrator for solar energy. They came up with the "ideal concentrator ", which has walls shaped...MULTIAPZRTURE OPTICAL SYSTEM RESEARCH ." Office of Naval Research Contract Number N00014-85-C-0862 . FINAL REPORT by RTS LABORATORIES, INC. 1663

  7. Cooperative Control of Distributed Autonomous Vehicles in Adversarial Environments

    DTIC Science & Technology

    2006-08-14

    COOPERATIVE CONTROL OF DISTRIBUTED AUTONOMOUS VEHICLES IN ADVERSARIAL ENVIRONMENTS Grant #F49620–01–1–0361 Final Report Jeff Shamma Department of...CONTRACT NUMBER F49620-01-1-0361 5b. GRANT NUMBER 4. TITLE AND SUBTITLE COOPERATIVE CONTROL OF DISTRIBUTED AUTONOMOUS VEHICLES IN...single dominant language or a distribution of languages. A relation to multivehicle systems is understanding how highly autonomous vehicles on extended

  8. Measuring Cross-Cultural Competence in Soldiers and Cadets: A Comparison of Existing Instruments

    DTIC Science & Technology

    2010-11-01

    Cracking the nonverbal code: Intercultural competence and gesture recognition across cultures . Journal of Cross - Cultural Psychology , 36, 380-395...Technical Report 1276 Measuring Cross - Cultural Competence in Soldiers and Cadets: A Comparison of Existing Instruments Allison Abbe U.S. Army...Final 3. DATES COVERED (from. . July 2008-August 2010 .to) 4. TITLE AND SUBTITLE 5a. CONTRACT OR GRANT NUMBER Measuring Cross - Cultural Competence

  9. Type-II Superlattice for High Performance LWIR Detectors

    DTIC Science & Technology

    2008-05-15

    Superlattice for High Performance LWIR Detectors 5. FUNDING NUMBERS F49620-03-1-0436 6. AUTHOR(S) M. Razeghi 7. PERFORMING ORGANIZATION NAME(S...298 (Rcv.2-89) Prescribed by ANSI Std. 239-18 298-102 Final Technical Report Type-II Superlattice for High Performance LWIR Detectors Contract No...Short-period InAs/GaSb type-II superlattices for mid- infrared detectors . Physica E: Low- dimensional Systems and Nanostructures, 2006.

  10. Evaluation of the Improved Flameless Ration Heater

    DTIC Science & Technology

    2001-12-01

    THROUGH SCIENCE TECHNICAL REPORT NATICKjTR.02/004 AD. _____ _ EVALUATION OF THE IMPROVED FLAMELESS RATION HEATER by Wendy K. Johnson and F...From- To) 21-12-2001 Final August 2000 - August 2001 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER EVALUATION OF THE IMPROVED FLAMELESS RATION HEATER...was conducted at Fort Wainwright, AK to evaluate two prototype heaters and a modified version of the current Flameless Ration Heater (FRH). The

  11. JOMAR: Joint Operations with Mobile Autonomous Robots

    DTIC Science & Technology

    2015-12-21

    AFRL-AFOSR-JP-TR-2015-0009 JOMAR: Joint Operations with Mobile Autonomous Robots Edwin Olson UNIVERSITY OF MICHIGAN Final Report 12/21/2015...SUBTITLE JOMAR: Joint Operations with Mobile Autonomous Robots 5a. CONTRACT NUMBER FA23861114024 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...14. ABSTRACT Under this grant, we formulated and implemented a variety of novel algorithms that address core problems in multi- robot systems. These

  12. Ultrabroadband Phased-Array Receivers Based on Optical Techniques

    DTIC Science & Technology

    2016-02-26

    AFRL-AFOSR-VA-TR-2016-0121 Ultrabroadband Phased- array Receivers Based on Optical Techniques Christopher Schuetz UNIVERSITY OF DELAWARE Final Report...Jul 15 4. TITLE AND SUBTITLE Ultrabroadband Phased- Array Receivers Based on Optical Techniques 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-12-1...receiver that enables us to capture and convert signals across an array using photonic modulators, routing these signals to a central location using

  13. Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools

    DTIC Science & Technology

    2014-01-14

    Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools Final Technical Report SERC -2014-TR-041-1 January 14...by the U.S. Department of Defense through the Systems Engineering Research Center ( SERC ) under Contract H98230-08-D-0171 (Task Order 0026, RT 51... SERC is a federally funded University Affiliated Research Center managed by Stevens Institute of Technology Any opinions, findings and

  14. Properties of Multiphase Polyurethane Systems.

    DTIC Science & Technology

    1983-07-01

    segment - diphenylmethane-diisocyanate/ N - methyldiethanolamine (MDI/ MDEA ). Each polymer was synthesized using a two step reaction technique. The number...OF MULTIPHASE POLYURETHANE SYSTEMS Final Report for Period July 1, 1982-June 30, 1983 Naval Air Systems Command Code 5304 C2 ONavy Contract # N 00019...and COB, UA groups. The existence of 3-dimensional hydrogen bonding (two C-O groups bonded to one N -H group) should shift the COB,UA peak to lower

  15. Electromagnetic-Optical Coherence Tomography Guidance of Transbronchial Solitary Pulmonary Nodule Biopsy

    DTIC Science & Technology

    2017-12-01

    AD_________________ (Leave blank) Award Number: W81XWH-13-1-0155 TITLE: Electromagnetic -Optical Coherence Tomography Guidance of Transbronchial...2. REPORT TYPE Final 3. DATES COVERED (From - To) 1 July 2013 - 30 Sep 2016 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Electromagnetic -Optical...SUPPLEMENTARY NOTES 14. ABSTRACT We present a novel high-resolution multimodality imaging platform utilizing CT and electromagnetic (EM) navigation for spatial

  16. Prototype for Meta-Algorithmic, Content-Aware Image Analysis

    DTIC Science & Technology

    2015-03-01

    PROTOTYPE FOR META-ALGORITHMIC, CONTENT-AWARE IMAGE ANALYSIS UNIVERSITY OF VIRGINIA MARCH 2015 FINAL TECHNICAL REPORT...ALGORITHMIC, CONTENT-AWARE IMAGE ANALYSIS 5a. CONTRACT NUMBER FA8750-12-C-0181 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 62305E 6. AUTHOR(S) S...approaches were studied in detail and their results on a sample dataset are presented. 15. SUBJECT TERMS Image Analysis , Computer Vision, Content

  17. Space Station crew safety alternatives study. Volume 5: Space Station safety plan

    NASA Technical Reports Server (NTRS)

    Mead, G. H.; Peercy, R. L., Jr.; Raasch, R. F.

    1985-01-01

    The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.

  18. Abiotic and Biotic Mechanisms Controlling In Situ Remediation of NDMA

    DTIC Science & Technology

    2009-05-01

    FINAL REPORT Abiotic and Biotic Mechanisms Controlling In Situ Remediation of NDMA SERDP Project ER-1421 MAY 2009 James E. Szecsody...00-2009 4. TITLE AND SUBTITLE Abiotic and Biotic Mechanisms Controlling In Situ Remediation of NDMA 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...investigate whether in situ coupled abiotic/biotic degradation of N-nitrosodimethylamine ( NDMA , an emerging contaminant) could be used as a permeable

  19. Final Report Bald and Golden Eagle Territory Surveys for the Lawrence Livermore National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fratanduono, M. L.

    2014-11-25

    Garcia and Associates (GANDA) was contracted by the Lawrence Livermore National Laboratory (LLNL) to conduct surveys for bald eagles (Haliaeetus leucocephalus) and golden eagles (Aquila chrysaetos) at Site 300 and in the surrounding area out to 10-miles. The survey effort was intended to document the boundaries of eagle territories by careful observation of eagle behavior from selected viewing locations throughout the study area.

  20. Quantum Entanglement of Quantum Dot Spin Using Flying Qubits

    DTIC Science & Technology

    2015-05-01

    QUANTUM ENTANGLEMENT OF QUANTUM DOT SPIN USING FLYING QUBITS UNIVERSITY OF MICHIGAN MAY 2015 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE...To) SEP 2012 – DEC 2014 4. TITLE AND SUBTITLE QUANTUM ENTANGLEMENT OF QUANTUM DOT SPIN USING FLYING QUBITS 5a. CONTRACT NUMBER FA8750-12-2-0333...been to advance the frontier of quantum entangled semiconductor electrons using ultrafast optical techniques. The approach is based on

  1. Data management system DIU test system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An operational and functional description is given of the data management system. Descriptions are included for the test control unit, analog stimulus panel, discrete stimulus panel, and the precision source. The mechanical configuration is defined and illustrated to provide card and component location for modification or repair. The unit level interfaces are mirror images of the DIU interfaces and are described in the Final Technical Report for NASA-MSFC contract NAS8-29155.

  2. Behavioral Ecology of Cetaceans: The Relationship of Body Condition with Behavior and Reproductive Success

    DTIC Science & Technology

    2012-05-01

    the harbour porpois, Phocoena phocoena. MSc Thesis, University of Guelph, Guelph, Ontario, Canada Koopman HN (2007) Phylogenetic , ecological , and...FINAL REPORT Behavioral Ecology of Cetaceans: The Relationship of Body Condition with Behavior and Reproductive Success SERDP Project RC...2011 – 04-05-2012 4. TITLE AND SUBTITLE h i l l f 5a. CONTRACT NUMBER Behavioral ecology of cetaceans: the relationship of body condition

  3. Identification of Metabolic Routes and Catabolic Enzymes Involved in Phytoremediation of the Nitro-Substituted Explosives TNT, RDX, and HMX

    DTIC Science & Technology

    2006-07-31

    Identification of Metabolic Routes and Catabolic Enzymes Involved in Phytoremediation of the Nitro- Substituted Explosives TNT, RDX...Routes and Catabolic Enzymes Involved in Phytoremediation of the Nitro-Substituted Explosives TNT, RDX, and HMX Final Technical Report 5a. CONTRACT NUMBER... Phytoremediation has been shown to provide a cost-effective alternative to classical technologies for cleaning up nitro-substituted explosive

  4. 77 FR 43780 - Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders AGENCIES... changing the scope of work for a time-and-materials (T&M) or labor-hour (LH) contract or order. DATES...-043, ``Time-and-Materials and Labor-Hour Contracts for Commercial Items'', was published as a final...

  5. Contract Audit Followup: Its Impact on Defense Contracting.

    DTIC Science & Technology

    1983-12-01

    NOTES Contract Auditor Disposition of Contract Audit Reports Contracting Officer Independent Role of Contracting Officer Contract Audit Report Overaged...fundamental shift in the relationship between the contracting officer and contract auditor , strengthening the auditor’s role while eroding the...the indepen- .1 ident role of the contracting officer; (2) attracts unneces- sary attention to the contracting officer/ auditor relationship; (3) imposes

  6. Actin retrograde flow and actomyosin II arc contraction drive receptor cluster dynamics at the immunological synapse in Jurkat T cells

    PubMed Central

    Yi, Jason; Wu, Xufeng S.; Crites, Travis; Hammer, John A.

    2012-01-01

    Actin retrograde flow and actomyosin II contraction have both been implicated in the inward movement of T cell receptor (TCR) microclusters and immunological synapse formation, but no study has integrated and quantified their relative contributions. Using Jurkat T cells expressing fluorescent myosin IIA heavy chain and F-tractin—a novel reporter for F-actin—we now provide direct evidence that the distal supramolecular activation cluster (dSMAC) and peripheral supramolecular activation cluster (pSMAC) correspond to lamellipodial (LP) and lamellar (LM) actin networks, respectively, as hypothesized previously. Our images reveal concentric and contracting actomyosin II arcs/rings at the LM/pSMAC. Moreover, the speeds of centripetally moving TCR microclusters correspond very closely to the rates of actin retrograde flow in the LP/dSMAC and actomyosin II arc contraction in the LM/pSMAC. Using cytochalasin D and jasplakinolide to selectively inhibit actin retrograde flow in the LP/dSMAC and blebbistatin to selectively inhibit actomyosin II arc contraction in the LM/pSMAC, we demonstrate that both forces are required for centripetal TCR microcluster transport. Finally, we show that leukocyte function–associated antigen 1 clusters accumulate over time at the inner aspect of the LM/pSMAC and that this accumulation depends on actomyosin II contraction. Thus actin retrograde flow and actomyosin II arc contraction coordinately drive receptor cluster dynamics at the immunological synapse. PMID:22219382

  7. Suppression of Peripheral Sympathetic Activity Underlies Protease-Activated Receptor 2-Mediated Hypotension

    PubMed Central

    Kim, Young-Hwan; Ahn, Duck-Sun; Joeng, Ji-Hyun

    2014-01-01

    Protease-activated receptor (PAR)-2 is expressed in endothelial cells and vascular smooth muscle cells. It plays a crucial role in regulating blood pressure via the modulation of peripheral vascular tone. Although some reports have suggested involvement of a neurogenic mechanism in PAR-2-induced hypotension, the accurate mechanism remains to be elucidated. To examine this possibility, we investigated the effect of PAR-2 activation on smooth muscle contraction evoked by electrical field stimulation (EFS) in the superior mesenteric artery. In the present study, PAR-2 agonists suppressed neurogenic contractions evoked by EFS in endothelium-denuded superior mesenteric arterial strips but did not affect contraction elicited by the external application of noradrenaline (NA). However, thrombin, a potent PAR-1 agonist, had no effect on EFS-evoked contraction. Additionally, ω-conotoxin GVIA (CgTx), a selective N-type Ca2+ channel (ICa-N) blocker, significantly inhibited EFS-evoked contraction, and this blockade almost completely occluded the suppression of EFS-evoked contraction by PAR-2 agonists. Finally, PAR-2 agonists suppressed the EFS-evoked overflow of NA in endothelium-denuded rat superior mesenteric arterial strips and this suppression was nearly completely occluded by ω-CgTx. These results suggest that activation of PAR-2 may suppress peripheral sympathetic outflow by modulating activity of ICa-N which are located in peripheral sympathetic nerve terminals, which results in PAR-2-induced hypotension. PMID:25598663

  8. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... requirements and contract clause. 742.1170-4 Section 742.1170-4 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-4 Progress reporting requirements and contract clause. (a) When the requiring...

  9. Final Report, January 1991 - July 1992

    NASA Astrophysics Data System (ADS)

    Ferrara, Jon

    1992-07-01

    This report covers final schedules, expenses and billings, monthly reports, testing, and deliveries for this contract. The goal of the detector development program for the Solar and Heliospheric Spacecraft (SOHO) EUV Imaging Telescope (EIT) is an Extreme UltraViolet (EUV) CCD (Change Collecting Device) camera. As a part of the CCD screening effort, the quantum efficiency (QE) of a prototype CCD has been measured in the NRL EUV laboratory over the wavelength range of 256 to 735 Angstroms. A simplified model has been applied to these QE measurements to illustrate the relevant physical processes that determine the performance of the detector. The charge transfer efficiency (CTE) characteristics of the Tektronix 1024 X 1024 CCD being developed for STIS/SOHO space imaging applications have been characterized at different signal levels, operating conditions, and temperatures using a variety of test methods. A number of CCD's have been manufactured using processing techniques developed to improve CTE, and test results on these devices will be used in determining the final chip design. In this paper, we discuss the CTE test methods used and present the results and conclusions of these tests.

  10. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  11. Motor training reduces surround inhibition in the motor cortex.

    PubMed

    Akkad, Haya; Di Stasio, Flavio; Tibold, Robert; Kassavetis, Panagiotis; Rothwell, John C; Edwards, Mark J

    2016-06-01

    Surround inhibition (SI) is thought to facilitate focal contraction of a hand muscle by keeping nearby muscles silent. Unexpectedly, SI is reduced in skilled pianists. We tested whether repeated practice of focal contraction in non-pianists could reduce SI. Motor-evoked potentials were elicited by transcranial magnetic stimulation in the relaxed abductor digiti minimi randomly at the onset and 5s after offset of a 2s focal contraction (10% maximum) of the first dorsal interosseous (FDI). Over 5 blocks of 40 trials participants obtained points for increasing contraction speed and stability in FDI. In a final block, the interval between contractions was varied randomly to increase attention to the task. Over the first 5 blocks, SI declined as performance (points scored) improved. In the final "attention" block SI increased towards baseline without affecting performance. Although SI may be useful during the early stages of learning, skilled focal finger movement does not require SI to prevent activity in non-involved muscles. This could be due to better targeting of the excitatory command to move. Results from the final block suggest that increased attention can re-engage SI when task parameters change. SI is not necessary for successful focal contraction, but may contribute during learning and during attention to task. Copyright © 2016 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  12. 77 FR 13508 - Certainty of Terms of Service Contracts and NVOCC Service Arrangements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... in a service contract with a carrier, although their experience with such index- linked contracts is... adjust based upon an index reflecting changes in market conditions. DATES: The Final Rule is effective March 7, 2012. FOR FURTHER INFORMATION CONTACT: Karen V. Gregory, Secretary, Federal Maritime Commission...

  13. 39 CFR 601.109 - Contract claims and disputes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: INTELLECTUAL PROPERTY RIGHTS OTHER THAN PATENTS PURCHASING OF PROPERTY AND SERVICES § 601.109 Contract claims... decision on a claim, and even when the supplier does not agree to use ADR, the contracting officer should... issuance of a final decision. (c) Supplier claim initiation. Supplier claims must be submitted in writing...

  14. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  15. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  16. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  17. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  18. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  19. Systems Integration, Analysis and Modeling Support to the HEDS Technology/Commercialization Initiative (HTCI)

    NASA Technical Reports Server (NTRS)

    Feingold, Harvey; ONeil, Dan (Technical Monitor)

    2002-01-01

    In response to a recommendation from OMB, NASA's Fiscal Year 2001 budget included a new program within the HEDS (Human Exploration and Development of Space) Enterprise called HEDS Technology/ Commercialization Initiative (HTCI). HTCI had three overarching goals: to support REDS analysis and planning for safe, affordable and effective future programs and projects that advance human exploration, scientific discovery, and the commercial development of space; to pursue research, development, and validation of breakthrough technologies and highly innovative systems concepts; and to advance die creation of strong partnerships within NASA, with U.S. industry and universities, and internationally. As part of its contracted effort, SAIC was to write a report contribution, describing die results of its task activities, to a final HTCI report prepared by MSFC. Unfortunately, government cancellation of the HTCI program in the summer of 2001 curtailed all efforts on the program including die Final HTCI report. In the absence of that report, SAIC has issued this final report in an attempt to document some of the technical material it produced. The report contains SAIC presentations for both HTCI workshops; a set of roadmap charts for the Systems Analysis, Integration and Modeling; and charts showing the evolution of the current TITAN modeling architecture.

  20. National Dam Safety Program. Bowling Green Dam, (MO 10262) Mississippi - Kaskaskia - St. Louis Basin, Pike County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1978-12-01

    4 L-7 hiI<±b fd .rvc~ a .3",d,! i:; ba ’-ii~ y :nztructl~n :).L a -- flattctod r~-%3 i Pazo u-3 and r.). 1yzj. f r 3n- the road-rmy, S11eet 13...Program " Final Report Bowling Green Reservoir Dam (MO 10262) 6. PERFORMING-ORG. REPORT NUMBER Pike County, Missouri 7. AUTHOR( a ) S. CONTRACT OR GRANT...if possible. If a classification is required, identify the classified items on the page by the appropriate symbol. CC; -ETION GUIDE General. Make

  1. Corona from Ice, Thunderstorm Electrification and Lightning Suppression.

    DTIC Science & Technology

    1980-11-01

    rates of droplets highly charged by interaction with corona streamers. Laboratory and theoretical studies have been performed in an effort to explore in...CORONA FROM ICE, THUNDERSTORM ELECTRIFICATION Final AND LIGHTNING SUPPRESSION 1 Sep 77 to 31 Aug 80 6. Performing Org. Report Number 7. Author(s) 8...Contract or Grant Number J. Latham AFOSR-77-3429 O"o 9. Performing Organization Name and Address 10. Program Element, Project, Task Physics Department

  2. Turbine Engine Flowpath Averaging Techniques

    DTIC Science & Technology

    1980-10-01

    u~%x AEDC- TMR- 8 I-G 1 • R. P TURBINE ENGINE FLOWPATH AVERAGING TECHNIQUES T. W. Skiles ARO, Inc. October 1980 Final Report for Period...COVERED 00-01-1980 to 00-10-1980 4. TITLE AND SUBTITLE Turbine Engine Flowpath Averaging Techniques 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...property for gas turbine engines were investigated. The investigation consisted of a literature review and review of turbine engine current flowpath

  3. Detection Of Malware Collusion With Static Dependence Analysis On Inter-App Communication

    DTIC Science & Technology

    2016-12-08

    DETECTION OF MALWARE COLLUSION WITH STATIC DEPENDENCE ANALYSIS ON INTER-APP COMMUNICATION VIRGINIA TECH DECEMBER 2016 FINAL TECHNICAL REPORT... DEPENDENCE ANALYSIS ON INTER-APP COMMUNICATION 5a. CONTRACT NUMBER FA8750-15-2-0076 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 61101E 6. AUTHOR(S...exploited. 15. SUBJECT TERMS Malware Collusion; Inter-App Communication; Static Dependence Analysis 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF

  4. Security Games Involving Search and Patrolling

    DTIC Science & Technology

    2017-04-28

    AFRL-AFOSR-UK-TR-2017-0032 Security Games Involving Search and Patrolling Steve Alpern UNIVERSITY OF WARWICK Final Report 04/28/2017 DISTRIBUTION A...From - To) 01 Feb 2014 to 31 Jan 2017 4. TITLE AND SUBTITLE Security Games Involving Search and Patrolling 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER...interview sequentially has been recently published. Work of Alpern and Howard (2016) solves a class of winner-take-all games which include the

  5. Recursive Gradient Estimation Using Splines for Navigation of Autonomous Vehicles.

    DTIC Science & Technology

    1985-07-01

    AUTONOMOUS VEHICLES C. N. SHEN DTIC " JULY 1985 SEP 1 219 85 V US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER LARGE CALIBER WEAPON SYSTEMS LABORATORY I...GRADIENT ESTIMATION USING SPLINES FOR NAVIGATION OF AUTONOMOUS VEHICLES Final S. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(q) 8. CONTRACT OR GRANT NUMBER...which require autonomous vehicles . Essential to these robotic vehicles is an adequate and efficient computer vision system. A potentially more

  6. Navy/Thomas Nelson Community College MLT Training Pilot Evaluation

    DTIC Science & Technology

    2002-06-01

    4825 Mark Center Drive • Alexandria, Virginia 22311-1850 CAB D0006007.A2/Final June 2002 Navy/Thomas Nelson Community College MLT Training Pilot...Navy/Thomas Nelson Community College MLT Training Pilot Evaluation 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release

  7. GnoSys: Raising the Level of Discourse in Programming

    DTIC Science & Technology

    2016-03-01

    slotting these results into their proper place in the unified whole is still ongoing as of the date of this final report. Approved for Public Release...static restrictions we place on type systems; they can be any computable property. This is in keep- ing with the general design philosophy of GnoSys...different languages. Because contracts are frequently placed on module boundaries, they ease the burden placed on our analysis and verification tools

  8. Multiscale Modeling and Simulation of Material Processing

    DTIC Science & Technology

    2006-07-01

    As a re- GIMP simulations . Fig. 2 illustrates the contact algo- suit, MPM using a single mesh tends to induce early con- rithm for the contact pair ...21-07-2006 Final Performance Report 05-01-2003 - 04-30-2006 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Multiscale Modeling and Simulation of Material...development of scaling laws for multiscale simulations from atomistic to continuum using material testing techniques, such as tension and indentation

  9. Origins of DNA Replication and Amplification in the Breast Cancer Genome

    DTIC Science & Technology

    2012-09-01

    W81XWH-10-1-0463 TITLE: Origins of DNA Replication and Amplification in the...2. REPORT TYPE Final 3. DATES COVERED 1 Sep 2010 – 31 Aug 2012 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Origins of DNA Replication and...described in the DOD funded parent grant, to test our hypothesis we need to map origins of DNA replication in the genome and ask which of these

  10. PAH Interactions with Soil and Effects on Bioaccessibility and Bioavailability to Humans

    DTIC Science & Technology

    2017-02-01

    FINAL REPORT PAH Interactions with Soil and Effects on Bioaccessibility and Bioavailability to Humans SERDP Project ER-1743 FEBRUARY...COVERED (From - To) 2010-2017 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER W912HQ-10-C-0010 PAH Interactions with Soil and Effects on Bioaccessibility...assessments and remedial decisions to focus research where it can be most effective ; Task 2) Develop an understanding of the mechanisms by which PAHs

  11. Advanced Multifunctional Materials for High Speed Combatant Hulls

    DTIC Science & Technology

    2015-11-25

    Combatant Hulls 5a. CONTRACT NUMBER 5b. GRANT NUMBER N00014-14-1-0269 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Mark S. Mirotznik 5d. PROJECT...High Speed Combatant Hulls ’ PI Information: Mark S. Mirotznik, Associate Professor Tel: (302) 831 -4241 Department of Electrical and Computer... HULLS FINAL TECHNICAL REPORT 1.0 Abstract In this ONR funded project investigators at the University of Delaware’s Department of Electrical

  12. Security of Quantum Repeater Network Operation

    DTIC Science & Technology

    2016-10-03

    readily in quantum networks than in classical networks. Our presentation at the SENT workshop attracted the attention of computer and network researchers...AFRL-AFOSR-JP-TR-2016-0079 Security of Quantum Repeater Network Operation Rodney Van Meter KEIO UNIVERSITY Final Report 10/03/2016 DISTRIBUTION A...To)  29 May 2014 to 28 May 2016 4. TITLE AND SUBTITLE Security of Quantum Repeater Network Operation 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386

  13. Finite Element Barotropic Model for the Indian and Western Pacific OceanBasin: Tidal Model Data Comparisons and Sensitivities

    DTIC Science & Technology

    2018-01-11

    From - To) 01/11/2018 Final Technical Report June 01 2016 - Dec 30 2017 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Finite - Element Barotropic Model...grid finite - element barotropic fully hydrodynamic model in order to understand the shallow-water dynamics of the Indian Ocean and Western Pacific Ocean...dissipative dissipative processes are explored. 15. SUBJECTTERMS finite - element , unstructured grid, barotropic tides, bathymetry, internal tide

  14. Active Control of Flexible Space Structures Using the Nitinol Shape Memory Actuators

    DTIC Science & Technology

    1987-10-01

    number) FIELD !GROUP SUBGROUP I Active Control, Nitinol Actuators, Space Structures 9. ABSTRACT (Continue on reverse if necessary and identify by block...number) Summarizes research progress in the feasibility demonstration of active vibration control using Nitinol shape memory actuators. Tests on...FLEXIBLE SPACE STRUCTURES USING NITINOL SHAPE MEMORY ACTUATORS FINAL REPORT FOR PHASE I SDIO CONTRACT #F49620-87-C-0035 0 BY DR. AMR M. BAZ KARIM R

  15. Development of High-Fill-Factor Large-Aperture Micromirrors for Agile Optical Phased Arrays

    DTIC Science & Technology

    2010-02-28

    Final Project Report Contract/Grant Title: Development of High-Fill-Factor Large-Aperture Micromirrors for Agile Optical Phased Arrays...factor (HFF) micromirror array (MMA) has been proposed, fabricated and tested. Optical-phased-array (OPA) beam steering based on the HFF MMA has also...electrically tuned to multiple 2. 1. Background High-fill-factor (HFF) micromirror arrays (MMAs) can form optical phased arrays (OPAs) for laser beam

  16. Buried Object Detection

    DTIC Science & Technology

    1988-01-22

    Final Report 19 January 1987 Army Research OfficeM Contract No. DAAL03..87-K-0052 National Center for Physical Acoustics D T ! C " Naioal P. 0. Box 847...black . umberJ FIELO I GROUP I SU9GROU-p Acoustic , Seismic, Acoustic seismic coupling, porefluid, pulse echo, propagation, soils, sound speed...seismic transfer function. /’An acoustic scheme for buried object detection is thought to involve a sound source above the ground and a microphone as a

  17. Fundamentals of Tribology Workshop Held at the University of Florida, Gainesville, Florida on 10-11 May 2010: Project Summary

    DTIC Science & Technology

    2010-05-01

    to prevent fouling • Environmental Materials Water and hydrocarbons as third bodies Controllable friction (thermal, stress, chemical induced...Final Report Air Force Grant # FA9550-10-1-0261 Fundamentals of Tribology Workshop For the period: 03/17/2020-02/14/2011 Contract... Tribology An AFOSR Sponsored Workshop Gainesville, FL May 2010 Project Summary On May 10-11, 2010, leading scientists and engineers of the

  18. Early Diagnosis and Intervention Strategies for Post-Traumatic Heterotopic Ossification in Severely Injured Extremities

    DTIC Science & Technology

    2016-12-01

    1 Award Number: W81XWH-12-2-0118 TITLE: Early Diagnosis and Intervention Strategies for Post -Traumatic Heterotopic Ossification in Severely...December 2016 TYPE OF REPORT: Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION...COVERED 30Sep2012 - 29Sep2016 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Early Diagnosis and Intervention Strategies for Post -Traumatic Heterotopic

  19. Toward Seamless Weather-Climate Prediction with a Global Cloud Resolving Model

    DTIC Science & Technology

    2016-01-14

    distribution is unlimited. TOWARD SEAMLESS WEATHER- CLIMATE PREDICTION WITH A GLOBAL CLOUD RESOLVING MODEL PI: Tim Li IPRC/SOEST, University of Hawaii at...Project Final Report 3. DATES COVERED (From - To) 1 May 2012 - 30 September 2015 4. TITLE AND SUBTITLE TOWARD SEAMLESS WEATHER- CLIMATE PREDICTION WITH...A GLOBAL CLOUD RESOLVING MODEL 5a. CONTRACT NUMBER 5b. GRANT NUMBER N000141210450 5c. PROGRAM ELEMENT NUMBER ONR Marine Meteorology Program 6

  20. Solar Cogeneration of Electricity and Hot Water at DoD Installations

    DTIC Science & Technology

    2014-05-01

    the cogeneration system displaces more energy (the impact is not 4-5X because the GHG intensity factors for offsetting electricity generation and...FINAL REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations ESTCP Project EW-201248 MAY 2014 Ratson Morad... Cogeneration of Electricity and Hot Water at DoD Installations 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

Top